| 2023-06-26 13:37:19 | CASE NO. ISPR 14-06F |
| | MANATEE EDUCATION CENTER EV PARKING EXPANSION |
| | 5904 NORTH FLAGLER DRIVE |
| | |
| | - CONTACT ERIC SCHNEIDER @ 561-822-1446, |
| | [email protected] |
| | |
| | - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN |
| | WRITTEN FORMAT. |
| | |
| | - WHEN RESUBMITTING, PLEASE PROVIDE TWO (2) PAPER |
| | COPIES AND AN ELECTRONIC COPY IN .PDF FORMAT OF ALL |
| | PLANS. PLEASE NOTE THAT CHANGES ON THE RESUBMITTED |
| | PLANS OR THE SUBMITTAL OF INFORMATION/PLANS TO ADDRESS |
| | THE COMMENTS MAY RESULT IN ADDITIONAL COMMENTS. |
| | |
| | - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT |
| | RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS |
| | FROM THE DATE OF THE PPRC MEETING (BY SEPTEMBER 13, |
| | 2023), THE PLANNING DIVISION MAY NOTIFY THE APPLICANT |
| | THAT THE CASE IS CONSIDERED WITHDRAWN. ANY FURTHER |
| | ACTION SHALL REQUIRE A NEW DEVELOPMENT APPLICATION. |
| | |
| | - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) |
| | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY ISSUED |
| | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE |
| | APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE |
| | WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($60). |
| | |
| | 1) THE PLANS DO NOT ACCURATELY SHOW THE EXISTING TREES |
| | WITHIN THE LIMITS OF WORK. THERE ARE TWO CRAPE MYRTLE |
| | TREES THAT ARE LOCATED IN THE TERMINAL ISLAND TO THE |
| | WEST OF THE EXISTING EV PARKING SPACES. THESE ARE NOT |
| | SHOWN ON THE SURVEY OR INDICATED ON THE LANDSCAPE OR |
| | CIVIL PLANS. THESE PLANS WERE SHOWN AS RELOCATED HERE |
| | AS PART CHANGED MADE IN 2018 AND ARE VISIBLE ON THE |
| | PICTOMETRY OF THE AREA; HOWEVER, THEY SEEM TO HAVE BEEN |
| | MISSED ON SUBSEQUENT LANDSCAPE PLANS. THE DISPOSITION |
| | OF THESE TREES NEEDS TO BE ACCURATELY LISTED, TO |
| | INCLUDE ANY REQUIRED MITIGATION IF THEY ARE REMOVED. |
| | |
| | 2) THE LANDSCAPE PLANS CALL OUT FOUR RELOCATED SABAL |
| | PALMS; HOWEVER, THERE DO NOT APPEAR TO BE FOUR SABAL |
| | PALMS IN THE LIMITS OF WORK AS THE SURVEY AND CIVIL |
| | PLAN SHOW MULTIPLE SYMBOLS FOR THESE TREES. THE DATA |
| | TABLE ON THE LANDSCAPE PLAN REFERS THE TREE ALTERATION |
| | PERMIT, BUT STAFF DOES NOT SEE ONE THAT WAS RECENTLY |
| | SUBMITTED. PLEASE CLARIFY, INCLUDING THE PROVISION OF |
| | DOCUMENTATION. |
| | |
| | 3) DO THE NEW EV SPACES REQUIRE ANY NEW ABOVE GRADE EV |
| | INFRASTRUCTURE OTHER THAN THE CHARGING STATION ITSELF, |
| | SUCH AS TRANSFORMERS, CHARGE BOXES, ETC.? IF SO, THESE |
| | SHALL BE CLEARLY SHOWN ON THE PLANS. |
| | |