| Plan Review Stops For Project Z23040026 |
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
P |
Date |
05-10-2023 |
|
|
Cont ID |
|
| Sent By |
samisial |
Date |
05-10-2023 |
Time |
12:40 |
Rev Time |
0.00 |
| Received By |
samisial |
Date |
05-10-2023 |
Time |
12:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
04-28-2023 |
|
|
Cont ID |
|
| Sent By |
samisial |
Date |
04-28-2023 |
Time |
12:03 |
Rev Time |
0.00 |
| Received By |
samisial |
Date |
04-28-2023 |
Time |
12:03 |
Sent To |
|
|
| Notes |
| 2023-04-28 12:29:14 | PLEASE PROVIDE AN AERIAL, PLAN, OR DRAWING SHOWING THE | | | LAYOUT OF THE PROPERTY AND THE TREE PROPOSED FOR | | | REMOVAL. INCLUDE THE SPECIES AND TREE CANOPY DIAMETER | | | (30' X 20' ACCORDING TO ARBORIST REPORT) ON THE PLAN. | | | IF A TREE IS PROPOSED FOR INSTALLATION PLEASE PROVIDE | | | THAT INFORMATION ON THE PLANS AND INLCUDE PROPOSED TREE | | | SPECIES, LOCATION, AND SIZE ON PLANS. IF NO TREE IS | | | PROPOSED FOR INSTALLATION, MITIGATION WILL BE PAID IN | | | TOTAL FOR CANOPY LOSS PRIOR TO THE ISSUANCE OF THIS | | | PERMIT. | | | | | | SMITH AMISIAL | | | [email protected] |
|
|
| |
Print |
|