| Plan Review Stops For Project Z22120020 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
01-11-2023 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
01-11-2023 |
Time |
19:46 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
04-21-2023 |
Time |
09:45 |
Sent To |
|
|
| Notes |
| 2023-01-11 19:47:38 | NO COMMENTS ON THE CLASS A SPECIAL USE PERMIT | | | APPLICATION FOR THE PROPOSED DOCK. |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
3 |
Status |
P |
Date |
03-30-2023 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
03-30-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
03-30-2025 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
F |
Date |
02-24-2023 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
02-24-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
02-24-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-02-24 10:00:07 | Z22120020 ??? 1525 N FLAGLER DOCK, RESUBMITTAL | | | | | | COMMENTS FROM RICK ROSSANO, SR. PROJECT COORDINATOR, | | | ENGINEERING SERVICES AT 561-494-1098 [email protected] | | | PLEASE PROVIDE CIVIL PLANS SHOWING WATER CONNECTIONS, | | | INCLUDING POTABLE. PROVIDE CALCULATIONS ON PLANS OF | | | EXISTING AND PROPOSED DEMANDS FOR WATER & SEWER | | | (AVERAGE, MAXIMUM AND PEAK) AND FIRE FLOW DEMANDS. | | | CALCULATIONS SHALL BE PER FAC 64E-6 FOR SEWER (IF ANY) | | | AND PER FAC 64-E.008 FOR WATER. | | | | | | PLEASE OBTAIN AND PROVIDE A COPY OF APPROVED FDEP ERP | | | SELF-CERTIFICATION FORM AS CONDITION OF APPROVAL. HTTPS | | | ://FLORIDADEP.GOV/WATER/SUBMERGED-LANDS-ENVIRONMENTAL-R | | | ESOURCES-COORDINATION/CONTENT/ERP-E-PERMITTING | | | | | | BACKFLOW ASSEMBLY AND METERS: | | | O SHOW AND LABEL ANY EXISTING OR PROPOSED WATER | | | SERVICES AND WATER METERS, ALONG WITH WHAT IS HAPPENING | | | TO THEM. | | | O SHOW EXISTING AND PROPOSED DEDICATED UTILITY | | | EASEMENTS TO ALLOW ACCESS FOR CITY PERSONNEL TO | | | PROPOSED UTILITY WATER METERS. VERIFY THAT THERE ARE NO | | | STRUCTURES WITHIN EASEMENT. | | | O PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED LOCATION | | | OF WATER METER AND BACKFLOW | | | PREVENTION. | | | O BACKFLOWS SHALL BE INSTALLED ON PRIVATE PROPERTY | | | OUTSIDE OF EASEMENTS AND RIGHTS OF WAY. DOMESTIC WATER | | | METERS SHALL BE INSTALLED IMMEDIATELY ADJACENT TO | | | PROPERTY LINE. 3 INCH AND LARGER WATER METERS SHALL BE | | | INSTALLED ABOVE-GROUND ONLY. | | | O CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA (MAKE | | | NOTE USC APPROVED) AND FIRE BACKFLOW PREVENTER AS DCDA. | | | | | | FORMAL ENGINEERING SUBMITTAL: | | | O FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | EASEMENT FOR PLACEMENT OF PROPOSED WATER METERS. | | | O FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES OF | | | WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS. | | | O FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING | | | APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT | | | SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING | | | SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED | | | LEAD-FREE DESIGN. | | | O FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY LINES | | | ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY | | | LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT | | | PARCELS. | | | | | | [email protected] | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
12-28-2022 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
12-28-2022 |
Time |
|
Rev Time |
|
| Received By |
rrossano |
Date |
12-28-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-12-28 09:36:43 | Z22120020 ??? 1525 N FLAGLER DOCK, 1ST SUBMITTAL | | | | | | COMMENTS FROM RICK ROSSANO, SR. PROJECT COORDINATOR, | | | ENGINEERING SERVICES AT 561-494-1098 [email protected] | | | PLEASE PROVIDE CIVIL PLANS SHOWING WATER AND SEWER(IF | | | ANY) CONNECTIONS. PROVIDE CALCULATIONS ON PLANS OF | | | EXISTING AND PROPOSED DEMANDS FOR WATER & SEWER | | | (AVERAGE, MAXIMUM AND PEAK) AND FIRE FLOW DEMANDS. | | | CALCULATIONS SHALL BE PER FAC 64E-6 FOR SEWER AND PER | | | FAC 64-E.008 FOR WATER. | | | | | | PLEASE OBTAIN AND PROVIDE A COPY OF APPROVED FDEP ERP | | | SELF-CERTIFICATION FORM. HTTPS://FLORIDADEP.GOV/WATER/S | | | UBMERGED-LANDS-ENVIRONMENTAL-RESOURCES-COORDINATION/CON | | | TENT/ERP-E-PERMITTING | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
01-04-2023 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
01-04-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
01-04-2023 |
Time |
14:37 |
Sent To |
|
|
| Notes |
| 2023-01-04 14:38:25 | FIRE HAS NO OBJECTIONS TO THE PROPOSED AND APPROVES. | | | | | | FIRE'S APPROVAL OF THIS SUBMITTED PROJECT MAY NOT | | | CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | 1) SUBMITTED PLANS SHALL COMPLY WITH THE REQUIREMENTS | | | OF NFPA 303 | | | 1.1.1 THIS STANDARD ALSO APPLIES TO SUPPORT FACILITIES | | | AND STRUCTURES USED FOR CONSTRUCTION, REPAIR, STORAGE, | | | HAULING AND | | | LAUNCHING, OR FUELING OF VESSELS IF FIRE ON A PIER | | | WOULD POSE AN IMMEDIATE THREAT TO THESE FACILITIES, OR | | | IF A FIRE AT A REFERENCED | | | FACILITY WOULD POSE AN IMMEDIATE THREAT TO A DOCKING | | | FACILITY. | | | 1.1.2 THIS STANDARD APPLIES TO MARINAS AND FACILITIES | | | SERVICING | | | SMALL RECREATIONAL AND COMMERCIAL CRAFT, YACHTS, AND | | | OTHER | | | CRAFT OF NOT MORE THAN 300 GROSS TONS. | | | PLEASE ENSURE COMPLIANCE | | | | | | | | | 2) THE FIRE DEPARTMENT SHALL BE PROVIDED WITH ACCESS TO | | | THE PROPOSED. | | | | | | PER NFPA 303 | | | 4.2.2 FIRE DEPARTMENT ACCESS. | | | 4.2.2.1 THE FIRE DEPARTMENT SHALL HAVE ACCESS TO | | | FENCED, GATED, OR LOCKED GROUNDS OR PIERS. | | | 4.2.2.2 APPROPRIATE MEANS OF ACCESS SUCH AS KEYS, | | | CARDKEYS, OR COMBINATIONS SHALL BE | | | PROVIDED TO THE FIRE DEPARTMENT OR SHALL BE PERMITTED | | | TO BE SECURED IN A LOCK BOX ON THE | | | PREMISES ACCESSIBLE TO THE FIRE DEPARTMENT | | | PLEASE ENSURE COMPLIANCE | | | | | | | | | 3) FIRE EXTINGUISHERS SHALL BE PROVIDED PER NFPA | | | 6.2 PORTABLE FIRE EXTINGUISHERS. | | | 6.2.1 PLACEMENT. | | | 6.2.1.1 PLACEMENT OF PORTABLE FIRE EXTINGUISHERS SHALL | | | BE IN ACCORDANCE WITH CHAPTER 5 OF | | | NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, | | | UNLESS OTHERWISE PERMITTED BY 6.2.1.1.1, 6.2.1.1.2, | | | OR 6.2.1.1.3 | | | 6.2.1.1.1 PLACEMENT OF PORTABLE FIRE EXTINGUISHERS ON | | | PIERS | | | AND ALONG BULKHEADS WHERE VESSELS ARE MOORED OR ARE | | | PERMIT TED TO BE MOORED SHALL MEET THE FOLLOWING | | | CRITERIA: | | | (1) EXTINGUISHERS LISTED FOR CLASS A, CLASS B, AND | | | CLASS C FIRES | | | SHALL BE INSTALLED AT THE PIER/LAND INTERSECTION ON A | | | PIER | | | THAT EXCEEDS 25 FT (7.62 M) IN LENGTH. | | | (2) ADDITIONAL FIRE EXTINGUISHERS SHALL BE PLACED SUCH | | | THAT THE | | | MAXIMUM TRAVEL DISTANCE TO AN EXTINGUISHER DOES NOT | | | EXCEED 75 FT (22.86 M) | | | PLEASE ENSURE COMPLIANCE | | | | | | | | | 4) A STANDPIPE SYSTEM IS REQUIRED PER NFPA 303 | | | 6.4* FIRE STANDPIPE SYSTEMS. | | | 6.4.1 CLASS I STANDPIPE SYSTEMS SHALL BE PROVIDED FOR | | | PIERS, BULKHEADS, AND BUILDINGS WHERE THE HOSE LAY | | | DISTANCE FROM THE | | | FIRE APPARATUS EXCEEDS 150 FT (45 M). | | | | | | | | | 5) A FIRE HYDRANT COULD NOT BE IDENTIFIED AND IF | | | APPLICABLE SHALL BE REQUIRED. | | | A HYDRANT WOULD BE REQUIRED FOR THE FDC STANDPIPE | | | SYSTEM AND BE WITHIN 100' OF EACH OTHER PER NFPA 14 | | | 6.6 HYDRANTS AND WATER SUPPLIES. HYDRANTS AND WATER | | | SUPPLIES | | | FOR FIRE PROTECTION IN MARINAS AND BOATYARDS SHALL BE | | | PROVIDED IN | | | ACCORDANCE WITH NFPA 13, STANDARD FOR THE INSTALLATION | | | OF SPRINKLER | | | SYSTEMS; NFPA 14, STANDARD FOR THE INSTALLATION OF | | | STANDPIPE AND HOSE | | | SYSTEMS; AND NFPA 24, STANDARD FOR THE INSTALLATION OF | | | PRIVATE FIRE | | | SERVICE MAINS AND THEIR APPURTENANCES | | | | | | | | | 6) ANY ELECTRICAL WORK OR ELECTRICAL SERVICE SHALL | | | COMPLY WITH THE REQUIREMENT OF NFPA 70 AND NFPA 303 | | | 5.1 NATIONAL ELECTRICAL CODE. THE REQUIREMENTS SET | | | FORTH HEREIN SUPPLEMENT AND RELATE THE REQUIREMENTS OF | | | NFPA 70, | | | NATIONAL ELECTRICAL CODE, TO THE SPECIFIC CONDITIONS | | | AND COMBINATIONS OF CONDITIONS FOUND IN MARINAS AND | | | BOATYARDS AND SHALL | | | BE FOLLOWED IN ADDITION TO ANY REQUIREMENTS FOUND IN | | | NFPA 70, INCLUDING, BUT NOT LIMITED TO, ARTICLE 555. | | | 5.2 LISTED OR LABELED. ALL ELECTRICAL MATERIALS, | | | DEVICES, APPLIANCES, FITTINGS, AND OTHER EQUIPMENT | | | SHALL BE LISTED OR LABELED | | | BY A QUALIFIED TESTING AGENCY AND SHALL BE INSTALLED | | | AND CONNECTED IN ACCORDANCE WITH LISTING REQUIREMENTS | | | AND/OR MANUFACTURERS INSTRUCTIONS. | | | 5.3 ELECTRICAL DATUM PLANE. | | | 5.3.1 A BENCH MARK INDICATING THE ELECTRICAL DATUM | | | PLANE (SEE3.3.7) OF THE LAND AREA SHALL BE PERMANENTLY | | | LOCATED ON SHORE | | | IN THE MARINA OR BOATYARD. | | | 5.3.2 ELECTRICAL SERVICES SHALL BE DISCONNECTED FROM | | | THE POWER SOURCE WHEN THE WATER LEVEL REACHES THE BENCH | | | MARK FOR THE | | | ELECTRICAL DATUM PLANE. | | | 5.3.3 ALL ELECTRICAL CONNECTIONS SHALL BE LOCATED AT | | | LEAST 12 IN. (305 MM) ABOVE THE DECK OF A FLOATING | | | PIER. | | | 5.3.4 ALL ELECTRICAL CONNECTIONS SHALL BE LOCATED AT | | | LEAST 12 IN. (305 MM) ABOVE THE DECK OF A FIXED PIER | | | BUT NOT BELOW THE | | | ELECTRICAL DATUM PLANE. (SEE 5.12.1 FOR RECEPTACLE | | | LOCATIONS.) | | | 5.9 ELECTRICAL INSTALLATION. | | | 5.9.1 WIRING ELECTRICAL EQUIPMENT AND MATERIALS | | | INSTALLED ON PIERS, WHARVES, DOCKS, OR SIMILAR | | | LOCATIONS, AND WIRING METHODS | | | SHALL SPECIFICALLY CONFORM TO THE REQUIREMENTS OF | | | ARTICLE 555 AND ANY OTHER APPLICABLE REQUIREMENTS OF | | | NFPA 70, NATIONAL | | | ELECTRICAL CODE. | | | | | | | | | 7) FIRE SHALL REVIEW ALL SUBMITTED PROJECT PLANS AT THE | | | APPLICABLE TIME AND IN ACCORDANCE WITH THE REQUIREMENTS | | | OF ALL APPLICABLE FIRE CODES AND STANDARDS. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
P |
Date |
01-10-2023 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
01-10-2023 |
Time |
14:04 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
01-10-2023 |
Time |
14:04 |
Sent To |
|
|
| Notes |
| 2023-01-10 14:05:19 | NO COMMENTS AT THIS TIME. |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PU |
PUBLIC UTILITIES |
| Rev No |
3 |
Status |
P |
Date |
04-17-2023 |
|
|
Cont ID |
|
| Sent By |
relizond |
Date |
04-17-2023 |
Time |
09:51 |
Rev Time |
0.00 |
| Received By |
relizond |
Date |
04-17-2023 |
Time |
09:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PU |
PUBLIC UTILITIES |
| Rev No |
2 |
Status |
F |
Date |
03-09-2023 |
|
|
Cont ID |
|
| Sent By |
relizond |
Date |
03-09-2023 |
Time |
15:54 |
Rev Time |
0.00 |
| Received By |
relizond |
Date |
03-09-2023 |
Time |
15:34 |
Sent To |
|
|
| Notes |
| 2023-03-09 15:53:57 | -PLEASE PROVIDE A PROFILE OF THE PROPOSED 6" WATER MAIN | | | -SHOW ALL DRY UTILITIES WITHIN THE SCOPE OF WORK | | | -ANCHOR TEES ARE A REQUIREMENT FOR FIRE HYDRANT | | | INSTALLATION PER CITY STANDARDS, PLEASE INCORPORATE | | | THIS INTO YOUR DESIGN | | | -DENOTE THE POINT OF SERVICE FOR THE PROPOSED FIRE LINE | | | |
|
|
| Review Stop |
PU |
PUBLIC UTILITIES |
| Rev No |
1 |
Status |
F |
Date |
01-09-2023 |
|
|
Cont ID |
|
| Sent By |
relizond |
Date |
01-09-2023 |
Time |
09:23 |
Rev Time |
0.00 |
| Received By |
relizond |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2023-01-09 09:23:10 | -WHERE WILL WATER FOR HOSE BIB BE SOURCED FROM? PLEASE | | | ELABORATE ON SERVICE FOR WATER WITH EXISTING CONDITIONS | | | OR A TAP MADE ON EXISTING PIPE RUNNING ON FLAGLER. | | | | | | RICKY ELIZONDO | | | [email protected] |
|
|
| Review Stop |
PU-CS |
PUBLIC UTILITIES CUSTOMER SRVC |
| Rev No |
3 |
Status |
P |
Date |
04-11-2023 |
|
|
Cont ID |
|
| Sent By |
mhurley |
Date |
04-11-2023 |
Time |
15:52 |
Rev Time |
0.00 |
| Received By |
mhurley |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2023-04-11 15:52:08 | FIRELINE BACKFLOW ASSEMBLY MUST BE RPDA TYPE INSTEAD OF | | | DCDA TYPE. UPDATE CIVIL PLAN AT ENGINEERING DEVELOPMENT | | | SUBMITTAL. |
|
|
| Review Stop |
PU-CS |
PUBLIC UTILITIES CUSTOMER SRVC |
| Rev No |
2 |
Status |
F |
Date |
02-24-2023 |
|
|
Cont ID |
|
| Sent By |
mhurley |
Date |
02-24-2023 |
Time |
11:37 |
Rev Time |
0.00 |
| Received By |
mhurley |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2023-02-24 11:38:24 | PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING: | | | -FIRE HYDRANT, FIRELINE BACKFLOW ASSEMBLY, AND FDC ARE | | | PROPOSED TO BE LOCATED IN 12 FOOT BICYCLE PATH | | | EASEMENT. PLEASE VERIFY THAT IS ACCEPTABLE AND WILL NOT | | | CONFLICT WITH ANY EASEMENT STIPULATIONS. | | | -FIRE HYDRANT AND SOME PORTIONS OF FIRELINE ARE IN THE | | | 20 FOOT EASEMENT. PLEASE PROVIDE MORE INFORMATION ABOUT | | | THE EASEMENT INCLUDING WHAT TYPE IT IS AND WHAT IT IS | | | USED FOR. ALSO VERIFY THE FIRE COMPONENTS DO NOT | | | CONFLICT WITH ANY EASEMENT STIPULATIONS. | | | -AT ENGINEERING DEVELOPMENT SUBMITTAL: ADDITIONAL | | | EASEMENTS MAY BE REQUIRED; ENGINEERING PLAN DESIGN MAY | | | NEED REVISION. | | | -FIRELINE BACKFLOW ASSEMBLY NEEDS TO BE RPDA TYPE, | | | LEAD-FREE, AND USC APPROVED. ENSURE FIRE PLAN DESIGNERS | | | ARE AWARE OF THE REQUIREMENTS. | | | RESPECTFULLY, | | | MARK HURLEY [email protected] |
|
|
| Review Stop |
PU-CS |
PUBLIC UTILITIES CUSTOMER SRVC |
| Rev No |
1 |
Status |
F |
Date |
01-06-2023 |
|
|
Cont ID |
|
| Sent By |
mhurley |
Date |
01-06-2023 |
Time |
11:16 |
Rev Time |
0.00 |
| Received By |
mhurley |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2023-01-06 11:15:52 | PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING: | | | -SHEET S3 TALKS ABOUT WATER AND HOSE BIBS NEAR THE | | | PEDESTALS. WHERE WILL WATER COME FROM? | | | -WILL ANY NEW METERED WATER SERVICES BE NEEDED? | | | -IS A FIRELINE WATER SERVICE NEEDED OR REQUIRED? IF NOT | | | SURE YOU CAN CONTACT CHIEF LEDUC - [email protected] | | | RESPECTFULLY, | | | MARK HURLEY [email protected] |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
2 |
Status |
P |
Date |
03-23-2023 |
|
|
Cont ID |
|
| Sent By |
|
Date |
03-23-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
03-23-2023 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
F |
Date |
01-09-2023 |
|
|
Cont ID |
|
| Sent By |
|
Date |
01-09-2023 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
01-09-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-01-09 11:37:19 | 1- PLEASE PROVIDE DUMPSTER ENCLOSURE DETAIL. FOR A | | | FREESTANDING SITE DUMPSTER ENCLOSURE, THE ENCLOSURE | | | SHALL COMPLY WITH THE LATEST REVISION OF CITY OF WEST | | | PALM BEACH GENERAL CONSTRUCTION-GARBAGE ENCLOSURE | | | STANDARD, GC-7. (LINK TO THE LATEST REVISION OF THE | | | GC-7 DOCUMENT: HTTPS://WWW.WPB.ORG/HOME/SHOWPUBLISHEDDO | | | CUMENT/3690/637629060422100000) | | | 2- IN CASE OF PROPOSING ADDITION OF ANY NEW CAN(S) IN | | | THE CITY`S RIGHT-OF-WAY , THE LOCATION AND QUANTITY OF | | | THE CAN(S) SHALL BE REVIEWED AND APPROVED BY PUBLIC | | | WORKS DEPARTMENT AND THE CAN(S) SHALL BE TYPE, SIZE AND | | | COLOR APPROVED BY PUBLIC WORKS DEPARTMENT. THE BUILDING | | | MAINTENANCE IS RESPONSIBLE TO MAINTAIN AND SERVICE THE | | | CAN(S). | | | 3- ALL THE PARKING STALL PAINTING SHALL COMPLY WITH THE | | | CITY`S MUNICIPAL CODE SECTION 94-485 AND FLORIDA | | | STATUES [553.5041 F.S.]. | | | 4- ALL STRIPING AND SIGNAGE SHALL COMPLY WITH THE | | | LATEST CITY OF WEST PALM BEACH STANDARD DETAILS AND | | | MEET THE M.U.T.C.D. LATEST EDITION. | | | 5- ALL PAVEMENT MARKING , SIGNING AND SIDEWALK DAMAGED | | | DURING CONSTRUCTION SHALL BE RESTORED. | | | | | | | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
3 |
Status |
P |
Date |
04-21-2023 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
04-21-2023 |
Time |
09:42 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
04-21-2023 |
Time |
09:45 |
Sent To |
|
|
| Notes |
| 2023-04-21 09:44:50 | CONDITION OF SITE PLAN APPROVAL: | | | PLANS FOR THE PROPOSED FIRELINE WITHIN THE RIGHT OF WAY | | | AND CROSSING THE SEAWALL WILL HAVE TO BE APPROVED BY | | | AND RECEIVE A PERMIT FROM THE ENGINEERING SERVICES | | | DEPARTMENT, |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
F |
Date |
03-10-2023 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
03-10-2023 |
Time |
08:59 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
03-10-2023 |
Time |
09:07 |
Sent To |
|
|
| Notes |
| 2023-03-10 09:07:14 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 2-23-2023 SUBMTITAL: | | | | | | 1.[NOT SATISFIED] TWO SCALES LISTED ON SHEET S-2. THE | | | SCALE BAR BY THE NORTH ARROW ON THE LEFT BOTTOM SIDE OF | | | THE PAGE LISTS THE SCALE AS 1 INCH EQUALS 50 FEET. THE | | | SCALE BY THE NORTH ARROW ON THE BOTTOM RIGHT OF THE | | | PAGE LISTS THE SCALE AS 1 INCH EQUALS 100 FEET. | | | | | | 2. [NOT SATISFIED] ADVISE IF A FDEP PERMIT WILL BE | | | NEEDED. THE SUBMITTED PERMIT EXPIRED 10/12/2013 AND WAS | | | FOR A DIFFERENT DOCK LAYOUT. PRIOR TO CONSTRUCTION | | | PROVIDE A VALID FDEP PERMIT FOR WORK WITHIN WATERS OF | | | THE STATE. | | | | | | 3. [NOT SATISFIED] SHOW ON SHEETS S-2 AND S-3 THE | | | 18-INCH RCP DRAINAGE PIPE FROM THE INLET IN N. FLAGLER | | | DRIVE TO THE SEAWALL. THE PIPE IS SHOWN ON THE SURVEY. | | | | | | 4. [NOT SATISFIED] SHOW ON SHEET S-3 THE 5 FT STORM | | | DRAINAGE EASEMENT SHOWN ON THE SURVEY. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | [email protected] | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
01-12-2023 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
01-12-2023 |
Time |
09:35 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
01-12-2023 |
Time |
09:36 |
Sent To |
|
|
| Notes |
| 2023-01-12 09:36:31 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. TWO SCALES LISTED ON SHEET S-2. | | | | | | 2. ADVISE IF A FDEP PERMIT WILL BE NEEDED. THE | | | SUBMITTED PERMIT EXPIRED 10/12/2013 AND WAS FOR A | | | DIFFERENT DOCK LAYOUT. | | | | | | 3. SHOW ON SHEETS S-2 AND S-3 THE 18??? RCP DRAINAGE | | | PIPE FROM THE INLET IN N. FLAGLER DRIVE TO THE SEAWALL. | | | THE PIPE IS SHOWN ON THE SURVEY. | | | | | | 4. SHOW ON SHEET S-3 THE 5??? STORM DRAINAGE EASEMENT | | | SHOWN ON THE SURVEY. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | [email protected] | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
P |
Date |
03-24-2023 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
03-24-2023 |
Time |
07:08 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
01-12-2023 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
01-12-2023 |
Time |
12:02 |
Rev Time |
|
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2023-01-12 12:14:59 | 1. NEED TO KNOW HOW REMOVEABLE STEPS IN SIDEWALK WILL | | | BE OPERATED. | | | 2. ANY PROPOSED WATER/ELECTRIC SERVICES CROSSING | | | FLAGLER WILL REQUIRE A PRIVATE UNDERGROUND UTILITY | | | EASEMENT. | | | 3. PLANNING WILL REQUIRE EXECUTION OF A DOCK COVENENT. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
4 |
Status |
P |
Date |
04-11-2023 |
|
|
Cont ID |
|
| Sent By |
|
Date |
04-11-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
04-11-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-04-11 12:37:27 | TRAFFIC COMMENTS | | | 1) SATISFIED. PROVIDE A MORE DETAILED DESIGN OF THE | | | SIDEWALK AND DOCK INTERFACE AREA. SHOWCASE AND PROPERLY | | | DIMENSION THE SIDEWALK AND ROADWAY AREAS IMPACTED BY | | | THE PROPOSED DEVELOPMENT | | | 2) SATISFIED. IF A MOVABLE/TEMPORARY RAMP IS PROPOSED, | | | INCLUDE SUCH FEATURE IN THE SITE PLAN, AND PROVIDE A | | | MEMO SHOWCASING TECHNICAL DETAILS AND EXPLAINING ITS | | | OPERATIONS | | | 3) DISMISSED BY CITY ADMINISTRATION. PROVIDE A | | | CROSSWALK ACROSS FLAGLER DR INCLUSIVE OF A MEDIAN | | | SAFETY ISLAND AND PEDESTRIAN FLASHER SIGNS. PLEASE | | | REFER TO THE CROSSWALK SYSTEM INSTALLED FURTHER NORTH | | | BY THE S LAKESIDE CT INTERSECTION | | | 4) SATISFIED. RESTRIPE THE CROSSWALK AND PAVEMENT | | | MARKINGS ACROSS L.A. KIRKSEY ST | | | 5) SATISFIED. VERIFY THAT SIDEWALK RAMPS AND DOCK | | | ACCESS ARE ADA COMPLIANT | | | 6) SATISFIED. SIGNAGE AND PAVEMENT MARKINGS REQUIREMENT | | | DISMISSED BY CITY ADMINISTRATION. INSTALL A | | | HIGH-VISIBILITY PEDESTRIAN CROSSWALK ACROSS FLAGLER. | | | PROVIDE DETAILS OF THE CROSSWALK RAMPS AND ADA | | | COMPLIANCE REFERENCE(S). A SCHEME 2 - CROSSWALK WITH | | | STOP SIGNING SHOULD BE IMPLEMENTED ACCORDING TO FDOT | | | INDEX 17346 SHEET NO. 10. THUS, PLEASE SHOWCASE | | | CORRESPONDING SIGNAGE AND PAVEMENT MARKINGS IN THE SITE | | | PLAN | | | 7) DISMISSED BY CITY ADMINISTRATION. PROVIDE DETAILS | | | AND SHOWCASE ON THE SITE PLAN THE CROSSWALK ACROSS 15TH | | | ST, AS WELL AS THE CORRESPONDING RAMPS, WHICH SHOULD BE | | | ADA COMPLIANT | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
3 |
Status |
F |
Date |
03-30-2023 |
|
|
Cont ID |
|
| Sent By |
|
Date |
03-30-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
03-30-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-03-30 13:18:48 | | | | 1) SATISFIED. PROVIDE A MORE DETAILED DESIGN OF THE | | | SIDEWALK AND DOCK INTERFACE AREA. SHOWCASE AND PROPERLY | | | DIMENSION THE SIDEWALK AND ROADWAY AREAS IMPACTED BY | | | THE PROPOSED DEVELOPMENT | | | 2) SATISFIED. IF A MOVABLE/TEMPORARY RAMP IS PROPOSED, | | | INCLUDE SUCH FEATURE IN THE SITE PLAN, AND PROVIDE A | | | MEMO SHOWCASING TECHNICAL DETAILS AND EXPLAINING ITS | | | OPERATIONS | | | 3) DISMISSED. PROVIDE A CROSSWALK ACROSS FLAGLER DR | | | INCLUSIVE OF A MEDIAN SAFETY ISLAND AND PEDESTRIAN | | | FLASHER SIGNS. PLEASE REFER TO THE CROSSWALK SYSTEM | | | INSTALLED FURTHER NORTH BY THE S LAKESIDE CT | | | INTERSECTION | | | 4) SATISFIED. RESTRIPE THE CROSSWALK AND PAVEMENT | | | MARKINGS ACROSS L.A. KIRKSEY ST | | | 5) SATISFIED. VERIFY THAT SIDEWALK RAMPS AND DOCK | | | ACCESS ARE ADA COMPLIANT | | | 6) PARTIALLY SATISFIED. INSTALL A HIGH-VISIBILITY | | | PEDESTRIAN CROSSWALK ACROSS FLAGLER. PROVIDE DETAILS OF | | | THE CROSSWALK RAMPS AND ADA COMPLIANCE REFERENCE(S). A | | | SCHEME 2 - CROSSWALK WITH STOP SIGNING SHOULD BE | | | IMPLEMENTED ACCORDING TO FDOT INDEX 17346 SHEET NO. 10. | | | THUS, PLEASE SHOWCASE CORRESPONDING SIGNAGE AND | | | PAVEMENT MARKINGS IN THE SITE PLAN | | | 7) PROVIDE DETAILS AND SHOWCASE ON THE SITE PLAN THE | | | CROSSWALK ACROSS 15TH ST, AS WELL AS THE CORRESPONDING | | | RAMPS, WHICH SHOULD BE ADA COMPLIANT | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
2 |
Status |
F |
Date |
03-15-2023 |
|
|
Cont ID |
|
| Sent By |
|
Date |
03-15-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
03-15-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-03-15 09:22:08 | 1) SATISFIED. PROVIDE A MORE DETAILED DESIGN OF THE | | | SIDEWALK AND DOCK INTERFACE AREA. SHOWCASE AND PROPERLY | | | DIMENSION THE SIDEWALK AND ROADWAY AREAS IMPACTED BY | | | THE PROPOSED DEVELOPMENT | | | 2) SATISFIED. IF A MOVABLE/TEMPORARY RAMP IS PROPOSED, | | | INCLUDE SUCH FEATURE IN THE SITE PLAN, AND PROVIDE A | | | MEMO SHOWCASING TECHNICAL DETAILS AND EXPLAINING ITS | | | OPERATIONS | | | 3) DISMISSED. PROVIDE A CROSSWALK ACROSS FLAGLER DR | | | INCLUSIVE OF A MEDIAN SAFETY ISLAND AND PEDESTRIAN | | | FLASHER SIGNS. PLEASE REFER TO THE CROSSWALK SYSTEM | | | INSTALLED FURTHER NORTH BY THE S LAKESIDE CT | | | INTERSECTION | | | 4) SATISFIED. RESTRIPE THE CROSSWALK AND PAVEMENT | | | MARKINGS ACROSS L.A. KIRKSEY ST | | | 5) SATISFIED. VERIFY THAT SIDEWALK RAMPS AND DOCK | | | ACCESS ARE ADA COMPLIANT | | | 6) INSTALL A HIGH-VISIBILITY PEDESTRIAN CROSSWALK | | | ACROSS FLAGLER | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
01-12-2023 |
|
|
Cont ID |
|
| Sent By |
|
Date |
01-12-2023 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
01-12-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-01-12 14:14:01 | 1) PROVIDE A MORE DETAILED DESIGN OF THE SIDEWALK AND | | | DOCK INTERFACE AREA. SHOWCASE AND PROPERLY DIMENSION | | | THE SIDEWALK AND ROADWAY AREAS IMPACTED BY THE PROPOSED | | | DEVELOPMENT | | | 2) IF A MOVABLE/TEMPORARY RAMP IS PROPOSED, INCLUDE | | | SUCH FEATURE IN THE SITE PLAN, AND PROVIDE A MEMO | | | SHOWCASING TECHNICAL DETAILS AND EXPLAINING ITS | | | OPERATIONS | | | 3) PROVIDE A CROSSWALK ACROSS FLAGLER DR INCLUSIVE OF A | | | MEDIAN SAFETY ISLAND AND PEDESTRIAN FLASHER SIGNS. | | | PLEASE REFER TO THE CROSSWALK SYSTEM INSTALLED FURTHER | | | NORTH BY THE S LAKESIDE CT INTERSECTION | | | 4) RESTRIPE THE CROSSWALK AND PAVEMENT MARKINGS ACROSS | | | L.A. KIRKSEY ST | | | 5) VERIFY THAT SIDEWALK RAMPS AND DOCK ACCESS ARE ADA | | | COMPLIANT | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
04-18-2023 |
|
|
Cont ID |
|
| Sent By |
asangele |
Date |
04-18-2023 |
Time |
09:20 |
Rev Time |
0.00 |
| Received By |
asangele |
Date |
04-18-2023 |
Time |
09:20 |
Sent To |
|
|
| Notes |
| 2023-04-18 09:23:28 | APPROVAL WITH CONDITION | | | 4/18/2023 | | | | | | | | | A DOCK COVENANT AND A HOLD HARMLESS AGREEMENT IS | | | PROVIDED. | | | | | | THIS IS REQUIRED S FOR ANY DOCK ADJACENT TO A SEAWALL | | | OWNED BY THE CITY. THE CONVANT SHALL BE EXECUTED PRIOR | | | TO THE ISSUANCE OF ANY PERMIT (S) RELATED TO THE | | | CONSTRUCTION OF THE DOCK. | | | | | | | | | | | | | | | ALEXIS SANGELEER | | | PLANNER | | | [email protected] |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
03-08-2023 |
|
|
Cont ID |
|
| Sent By |
asangele |
Date |
03-08-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
asangele |
Date |
03-08-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-03-08 10:15:26 | 3/8/2023 | | | | | | | | | GENERAL COMMENTS; | | | | | | OUTREACH WITH THE NEIGHBORS IS HIGHLY ENCOURAGED TO | | | ADDRESS ANY QUESTIONS/CONCERNS WITH THE NEIGHBORS PROIR | | | TO THE HEARING STAGE. | | | | | | A DOCK COVENANT AND A HOLD HARMLESS AGREEMENT SHALL BE | | | REQUIRED FOR ANY DOCK ADJACENT TO A SEAWALL OWNED BY | | | THE CITY. THE CONVANT SHALL BE EXECUTED PRIOR TO THE | | | ISSUANCE OF ANY PERMIT (S) RELATED TO THE CONSTRUCTION | | | OF THE DOCK. | | | | | | ARMY CORPS OF ENGINEERS PERMIT IS VALID UNTIL MARCH | | | 27,2023 PLEASE EITHER PROVIDE A NEW PERMIT OR THAT THE | | | EXTENTION LETTER STATING THAT THE PERMIT IS INDEED | | | STILL VALID PASSED THE EXPIRATION DATE. | | | | | | INSTRUCTIONS FOR RESUMITTAL: | | | | | | PLEASE PROVIDE RESPONSES TOREVIEW COMMENTS IN WRITTEN | | | FORMAT. | | | | | | WHEN RESUBMITTING PLEASE PROVIDE A MINIMUM OF THREE (3) | | | PAPER COPIES, AND ONE REDUCED COPY OF THE PLANS IN 11 | | | INCHES X 17 INCHES, AND AN ELECTRONIC COPY OF ALL PLANS | | | AND DOCUMENTS. | | | | | | PLEASE NOTE THAT CHANGES ON THE RESUBMITTED PLANS MAY | | | RESULT IN ADDITIONAL COMMENTS. | | | | | | PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL; AT NO ADDITIONAL COST. IF PREVIOSLY- | | | ISSUED COMMENTS CONTINUE TO NOT BE SUFFICENTLY | | | ADDRESSED, TH E APPLICANT WILL BE ASSESSED A | | | RESUBMITTAL FEE. SUCH FEE WILL BE 20 PERCENT OF THE | | | ORGINAL APPLICATION FEE. | | | | | | CONTACT ALEXIS SANGELEER @ (561) 822 - 1443 IF THERE | | | ARE ANY QUESTIONS. | | | | | | | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
01-10-2023 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
01-10-2023 |
Time |
|
Rev Time |
|
| Received By |
llouie |
Date |
01-10-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-01-10 12:54:04 | GENERAL COMMENTS: | | | | | | 1.) HAS THERE BEEN ANY OUTREACH TO INFORM THE NEIGHBORS | | | OF THE APPLICATION? OUTREACH WITH THE NEIGHBORS IS | | | HIGHLY ENCOURAGED TO ADDRESS ANY QUESTIONS/CONCERNS | | | WITH THE NEIGHBORS PRIOR TO THE HEARING STAGE. | | | | | | 2.) AN ORIGINAL SIGNED AND SEALED SURVEY IS REQUIRED | | | FOR THE FILE. ONLY COPIES (NOT SEALED) WERE PROVIDED IN | | | THE APPLICATION SUBMITTAL. | | | | | | 3.) IN THE SITE PLAN FOR THE PROPOSED DOCK STRUCTURE, | | | SHOW PROJECTING LINES (AS EXTENDED INTO THE WATERWAY) | | | DEPICTING THE LOT DIVIDED INTO THIRDS TO DEMONSTRATE | | | THAT ALL COMPONENTS OF THE PROPOSED DOCK STRUCTURE | | | (I.E. DOCK, PLATFORMS, PILINGS/DOLPHINS, ETC.) ARE | | | LOCATED WITHIN THE MIDDLE ONE-THIRD OF THE LOT. [ZLDR | | | S.94-313(A)(3)(H)] | | | | | | 4.) IT IS NOTED IN THE PLANS THAT THERE WILL BE A "TWO | | | STEP REMOVABLE STAIR." PLEASE PROVIDE MORE INFORMATION | | | TO HOW THIS WILL FUNCTION (STRUCTURES CANNOT BE LEFT | | | WITHIN THE RIGHT-OF-WAY). | | | | | | 5.) A DOCK COVENANT AND A HOLD HARMLESS AGREEMENT SHALL | | | BE REQUIRED FOR ANY DOCK ADJACENT TO A SEAWALL OWNED BY | | | THE CITY. THE COVENANT SHALL BE EXECUTED PRIOR TO THE | | | ISSUANCE OF ANY PERMIT(S) RELATED TO THE CONSTRUCTION | | | OF THE DOCK. | | | | | | 6.) THE APPLICANT'S RESPONSE TO THE WAIVER STANDARDS | | | [ZLDR S.94-273(A)(2)] APPEAR TO BE MISSING FROM THE | | | APPLICATION SUBMISSION PACKET. | | | | | | 7.) THE JUSTIFICATION STATEMENT PROVIDES THAT THE | | | PROPOSED DOCK IS 40% SHORTER THAN THE DOCK FOR THE PALM | | | BEACH YACHT CLUB. PLEASE EXPLAIN, AS THE PROPOSED DOCK | | | (INCLUDING ALL COMPONENTS, SUCH AS PILINGS, ETC.) | | | APPEAR TO BE GREATER IN LENGTH THAN THE DOCK REFERENCED | | | IN THE JUSTIFICATION. | | | | | | 8.) PLEASE HAVE THE MARINE ENGINEER PROVIDE MORE | | | INFORMATION/ANALYSIS ON THE LENGTH OF THE PROPOSED DOCK | | | AND THE SAFE NAVIGATION OF VESSELS IN THE GENERAL AREA. | | | | | | 9.) THE ANALYSIS PROVIDED BY OCEAN CONSULTING, LLC MAKE | | | REFERENCES TO OTHER DOCKS IN THE AREA (REFERENCE PAGE 3 | | | - REGINAL PRECEDENT AND HISTORICAL PERMITTING). WHERE | | | ARE THESE DOCKS LOCATED AND PROVIDE MORE | | | INFORMATION/DATA. | | | | | | 10.) EXECUTED ADDRESS LIST AFFIDAVIT MISSING FROM | | | APPLICATION PACKET. | | | | | | | | | INSTRUCTIONS FOR RESUBMITTAL: | | | | | | * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN | | | WRITTEN FORMAT. | | | | | | * WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF THREE | | | (3) PAPER COPIES, AND ONE REDUCED COPY OF THE PLANS IN | | | 11 INCHES X 17 INCHES, AND AN ELECTRONIC COPY OF ALL | | | PLANS AND DOCUMENTS. | | | | | | * PLEASE NOTE THAT CHANGES ON THE RESUBMITTED PLANS MAY | | | RESULT IN ADDITIONAL COMMENTS. | | | | | | * PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20 PERCENT OF THE ORIGINAL APPLICATION FEE. | | | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | | QUESTIONS. | | | |
|
|
| |