Plan Review Details - Project Z22110009
| Plan Review Stops For Project Z22110009 |
| Review Stop |
AIPP |
ART IN PUBLIC PLACES |
| Rev No |
1 |
Status |
N |
Date |
01-03-2023 |
|
|
Cont ID |
|
| Sent By |
swelter |
Date |
01-03-2023 |
Time |
13:05 |
Rev Time |
0.00 |
| Received By |
swelter |
Date |
01-03-2023 |
Time |
13:06 |
Sent To |
|
|
| Notes |
| 2023-01-03 13:06:03 | NON-PROFIT - EXEMPT FOR AIPP |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
02-01-2023 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
02-01-2023 |
Time |
10:21 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
02-01-2023 |
Time |
10:21 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
12-02-2022 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
12-02-2022 |
Time |
19:04 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
12-02-2022 |
Time |
19:04 |
Sent To |
|
|
| Notes |
| 2022-12-02 19:14:27 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. DEMOLITION OF THE 5 EXISTING 1-STORY BUILDINGS. AN | | | ASBESTOS SURVEY SHALL BE PERFORMED AND AN ASBESTOS | | | ABATEMENT REPORT SUBMITTED TO THE HEALTH DEPARTMENT | | | PALM BEACH COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) | | | 837-5963, OR BY EMAIL: [email protected] | | | | | | 3. FLOOD ZONE. ACCORDING TO THE ADOPTED FLOOD INSURANCE | | | RATE MAPS (FIRMS), THE PROPOSED BUILDINGS ARE IN FLOOD | | | ZONE AE, WITH A BASE FLOOD ELEVATION OF 12.2 FT NAVD. | | | THE FIRST FLOOR OF THE BUILDING AND ALL ASSOCIATED | | | MECHANICAL EQUIPMENT (CHILLERS, GENERATORS ETC.) SHALL | | | BE 24 INCHES (FREEBOARD) ABOVE THE BASE FLOOD | | | ELEVATION. | | | | | | 4. ELECTRIC VEHICLE CHARGING STATION. IF ELECTRIC | | | VEHICLE (EV) CHARGING STATIONS ARE PROVIDED AT LEAST 1 | | | IN 25 MUST COMPLY WITH ACCESSIBLE PARKING SPACE | | | REQUIREMENTS. | | | | | | 5. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 6. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS, | | | GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND | | | OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS, | | | SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC. | | | | | | 7. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT | | | WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL | | | HAVE A SEPARATE ADDRESS ASSIGNED BASED ON THE LOCATION | | | OF THE BUILDING ENTRANCE. FOR STREET ADDRESSING, | | | CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT | | | (561) 805 6659, OR BY EMAIL: [email protected] | | | | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
P |
Date |
12-30-2022 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
12-30-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
12-30-2022 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
11-22-2022 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
11-22-2022 |
Time |
|
Rev Time |
|
| Received By |
rrossano |
Date |
11-22-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-11-22 15:40:48 | COMMENTS FROM RICK ROSSANO, SR. PROJECT COORDINATOR, | | | ENGINEERING SERVICES AT 561-494-1098 [email protected] | | | GENERAL: | | | O PROVIDE SEPARATE UTILITY AND PDG SHEETS. | | | O PLEASE RESPOND TO ALL COMMENTS IN WRITING, AND | | | INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER | | | (Z-XXXXXXXX). | | | O THE CITY OF WEST PALM BEACH HAS A NUMBER OF | | | REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY | | | AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND | | | WASTEWATER UTILITIES WITHIN THE CITY. PLEASE SEE | | | DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AT THE LINK | | | BELOW: | | | A. HTTP://WPB.ORG/CMSPAGES/GETAMAZONFILE.ASPX?PATH=~\WP | | | B_WEBSITE\MEDIA\ENGINEERING\DEVELOPMENT-APPLICATION-FUL | | | L-PACKAGE_2016.PDF&HASH=7BD4DD7EB6115181D8C5977BCC02A97 | | | B1960045731D3658206F27451722716EF | | | B. THIS AND OTHER RELATED ENGINEERING DOCUMENTS CAN BE | | | FOUND HERE: | | | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR | | | MS,-PERMITS-APPLICATIONS | | | C. ALSO SEE: CODE OF ORDINANCES, CITY OF WEST PALM | | | BEACH, FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, | | | ADOPTED SEPT. 22, 2008. (SUPPLEMENT NO. 18) | | | CHAPTER 90 UTILITIES, ARTICLE I. IN GENERAL, | | | SEC. 90-7. POLICY REGARDING EXTENSION OF WATER OR SEWER | | | SERVICE FACILITIES OF THE CITY. | | | THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE | | | CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY | | | BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS, | | | BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION. | | | O AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH | | | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, | | | STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR | | | MORE INFORMATION, REFER TO THE LINK BELOW: | | | A. HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PU | | | BLICATIONS/BACKFLOW-CROSS-CONNECTION- CONTROL-MANUAL | | | O PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY | | | OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC | | | RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF | | | YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE | | | MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL | | | IN THE WPB ENGINEERING SERVICES DEPARTMENT AT | | | [email protected] OR 561-494-1079 FOR FURTHER | | | ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION | | | ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD | | | SURVEY, POT-HOLING, SOFT DIGS ETC. | | | O PROVIDE EXISTING AND PROPOSED PERVIOUS AND IMPERVIOUS | | | DATA. | | | | | | BACKFLOW ASSEMBLY AND METERS: | | | O SHOW AND LABEL ANY EXISTING OR PROPOSED WATER | | | SERVICES AND WATER METERS, ALONG WITH WHAT IS HAPPENING | | | TO THEM. | | | O PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED LOCATION | | | OF WATER METER AND BACKFLOW PREVENTION. | | | O CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA (MAKE | | | NOTE USC APPROVED) AND FIRE BACKFLOW PREVENTER AS DCDA. | | | | | | WATER/WASTEWATER PLAN: | | | O LABEL EXISTING LIFT STATION (REMOVE OR TO REMAIN). | | | O PROVIDE VERTICAL DATUM AND DATUM CONVERSION | | | INFORMATION (NAVD 1988 AND NGVD 1929). | | | O PROVIDE LEGEND ON ALL PLAN SHEETS TO INCLUDE | | | STREETLIGHT, SIGN POSTS, TRANSFORMER BOXES ETC. | | | O PLANS SHALL SHOW EXISTING AND PROPOSED LOCATIONS AND | | | DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND | | | SEWER LINES AND CLEANOUTS, INCLUDING STUBS TO EACH | | | PROPERTY LINE FOR WATER AND SANITARY SEWERS, THE MAKE | | | AND MODEL OF ALL VALVES, POTABLE AND IRRIGATION METERS, | | | BACKFLOWS, FIRE HYDRANTS AND FDCS, AND OTHER DEVICES TO | | | BE INSTALLED ON THE SYSTEM, CATCH BASINS, CULVERTS, | | | DITCHES INCLUDING GRADES, PIPES SIZES, MATERIALS, | | | ELEVATIONS, ASSUMPTIONS, CALCULATIONS, INVERT | | | ELEVATIONS FOR ALL INLETS AND MANHOLES AND PROFILES OF | | | SANITARY SEWER LINES. | | | O GATE VALVE BOXES SHALL NOT BE INSTALLED IN CURB OR | | | SIDEWALK. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE | | | PROFILE VIEW. | | | O DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN | | | VIEW FOR ALL SANITARY AND STORM SEWERS. | | | O SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT | | | MATERIAL. | | | O PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED | | | UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC, | | | ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION | | | FACILITIES INCLUDING PIPE SIZE AND MATERIAL LOCATED IN | | | THE RIGHT-OF-WAY. | | | O PROVIDE PROFILE AND CLEARANCES BETWEEN WATER, SEWER | | | AND STORM LINES PER CITY OF WEST PALM BEACH STANDARD | | | DETAIL GN-2 SERIES, AT ALL UTILITY CROSSINGS. PLEASE | | | INCLUDE FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION & | | | TELECOMMUNICATION FACILITIES INCLUDING PIPE SIZE AND | | | MATERIAL LOCATED IN THE RIGHT-OF-WAY. | | | O SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE DIRECTLY | | | TO ENGINEERING (SHEET 33 OF CITY OF WPB DEVELOPMENT | | | APPLICATION). PROVIDE CALCULATIONS ON PLANS OF EXISTING | | | AND PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, | | | MAXIMUM AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS | | | SHALL BE PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 | | | FOR WATER. | | | O PROVIDE FIRE FLOW TEST DATA. | | | O PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER FROM | | | MH6675 TO MH2076 (CONDITION OF SITE PLAN APPROVAL). | | | O CUT AND CAP UTILITIES NOT IN USE AND REMOVE ANY | | | ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY | | | ROW. | | | O WHEN PROPOSED, WATER MAINS IN CITY RIGHT OF WAY SHALL | | | BE MADE OF DUCTILE IRON PIPE (NOT PVC) AND SPECIFY | | | PROPOSED LENGTH IN FEET. | | | O CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY | | | SEWER ARE REQUIRED. | | | O ADD NOTE TO PLANS SPECIFYING CITY???S DOWNSTREAM LIFT | | | STATION NUMBER. | | | O LABEL WATER LINES AS PRIVATE WHERE APPLICABLE. | | | O PER CITY STANDARDS MAINTAIN MINIMUM DISTANCE BETWEEN | | | OUTSIDE DIAMETER OF CITY PIPE AND ROOT BARRIER. | | | O ROAD TO REMAIN OPEN DURING CONSTRUCTION. | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
01-31-2023 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
01-31-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
01-31-2023 |
Time |
10:18 |
Sent To |
|
|
| Notes |
| 2023-01-31 10:19:13 | AFTER A REVIEW OF THE PPRC RESPONSE PACKET FOR THIS | | | PROJECT, THE PREVIOUSLY SUBMITTED FIRE PREVENTION | | | BUREAU COMMENTS APPEAR TO HAVE BEEN ADDRESSED. | | | | | | HOWEVER, THE BUREAU'S APPROVAL OF THIS SUBMITTED | | | PROJECT DOES NOT CONSTITUTE ITS FINAL REVIEW OR | | | APPROVAL. | | | | | | THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT | | | THE APPROPRIATE TIME AND IN ACCORDANCE WITH THE | | | REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | WEST PALM BEACH FIRE DEPARTMENT | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
11-29-2022 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
11-29-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
11-22-2022 |
Time |
14:41 |
Sent To |
|
|
| Notes |
| 2022-11-29 11:11:09 | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, | | | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM | | | BEACH FIRE DEPARTMENT. | | | | | | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE | | | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. | | | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS | | | ARE SUBMITTED FOR PERMIT. | | | | | | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE | | | PROPOSED PROJECT. THE FOLLOWING COMMENTS ARE INTENDED | | | TO PROVIDE GUIDANCE FOR BUILDING PLAN SUBMITTAL. | | | | | | 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY | | | WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE | | | PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A | | | PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED | | | TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN | | | STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY | | | MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER | | | PROTECTION. | | | | | | 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY | | | IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING | | | ALL CONSTRUCTION ACTIVITIES. | | | | | | 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM | | | ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION. | | | ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND | | | AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT | | | WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS. | | | | | | 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE | | | REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE | | | ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS. | | | | | | 5. THE CONSTRUCTION OF THE BUILDING(S) SHALL COMPLY | | | WITH THE 7TH EDITION OF THE FLORIDA FIRE PREVENTION | | | CODE, INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE | | | CODES. | | | | | | 6. FOR PLAN REVIEW SUBMITTAL, PLEASE INCLUDE THE | | | OCCUPANCY TYPE PER THE FLORIDA FIRE PREVENTION CODE. | | | | | | 7. FOR PLAN REVIEW SUBMITTAL, PLEASE ENSURE THAT A FIRE | | | LOAD CALCULATION IS INCLUDED, AND THAT ADEQUATE WATER | | | SUPPLY IS EXISTING OR WILL BE PROVIDED. | | | | | | 8. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED | | | ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF | | | FIRE PREVENTION. | | | | | | THE PROPOSED LOCATION OF THE FIRE HYDRANT AND FDC SHALL | | | BE WITHIN 100' OF EACH OTHER AND CLOSELY COORDINATED | | | WITH THE BUREAU OF FIRE PREVENTION. | | | | | | 9. PROVIDE FOR A FIRE SPRINKLER AND/OR FIRE ALARM PER | | | THE APPLICABLE OCCUPANCY CODE. FOR ANY LIFE SAFETY | | | ENGINEERED SYSTEM, I.E FIRE SPRINKLER AND FIRE ALARM, | | | ENSURE THEY COMPLY WITH THE REQUIREMENTS OF F.A.C. 61G | | | AND SUBMITTED WITH THE MASTER PERMIT. | | | | | | 9A. THE LOCATION OF ANY APPLICABLE DDCV AND FIRE LINE | | | LOCATIONS SHALL MEET AND BE INSTALLED PER THE | | | REQUIREMENTS OF NFPA 24 AND SHALL BE COORDINATED WITH | | | THE OFFICE OF FIRE MARSHAL, THE CITY'S ENGINEERS | | | OFFICE, THE LANDSCAPE PLANNER, AND THE CITY'S PLANNING | | | AND ZONING OFFICE. | | | | | | 10. COMPLETE LIFE SAFETY PLANS FOR THE OCCUPANCY SHALL | | | BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL | | | DISTANCES, EXIT SEPARATION DISTANCES, COMMON PATHS OF | | | TRAVEL, DEAD-END CORRIDORS, EXIT SIGNS, EMERGENCY | | | LIGHTING, EXITS LEADING TO A PUBLIC WAY, FIRE | | | EXTINGUISHER LOCATIONS, AND ALL FIRE SAFETY FEATURES | | | AND EQUIPMENT. | | | | | | 11. IT IS HIGHLY RECOMMENDED (REQUIRED WITH FIRE | | | SPRINKLER SYSTEM) THAT A KNOX BOX WITH KEYS FOR ENTRY | | | DOOR LOCKS BE PROVIDED FOR 24 HOUR EMERGENCY ACCESS. | | | | | | 12. AREAS OF REFUGE SHALL BE PROVIDED AS REQUIRED PER | | | THE FLORIDA BUILDING CODE AND NFPA 101, CH 7, MEANS OF | | | EGRESS. | | | | | | ALL NEW ELEVATORS SHALL CONFORM TO THE FIRE FIGHTER???S | | | EMERGENCY OPERATIONS REQUIREMENTS OF ASME A17.1/CSA | | | B44, SAFETY CODE FOR ELEVATORS. | | | | | | 13. TWO-WAY RADIO COMMUNICATIONS ENHANCEMENT SYSTEMS. | | | | | | NFPA 1, CHAPTER 11, BUILDING SERVICES; 11.10 TWO-WAY | | | RADIO ENHANCEMENT SERVICES. | | | | | | 11.10.1 IN ALL NEW AND EXISTING BUILDINGS, MINIMUM | | | RADIO SIGNAL STRENGTH FOR FIRE DEPARTMENT | | | COMMUNICATIONS SHALL BE MAINTAINED AT A LEVEL | | | DETERMINED BY THE AHJ. | | | | | | IF APPLICABLE, CONTACT WILL NEED TO BE MADE TO MARK | | | FILLA, PALM BEACH COUNTY PUBLIC SAFETY RADIO SYSTEMS | | | MANAGER, [email protected], 561-233-0837; AS OUR RADIOS | | | OPERATE ON THEIR SYSTEM FOR DETAILED RADIO FREQUENCY | | | AND INSTALLATION INSTRUCTIONS. | | | | | | 14. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT | | | DOES NOT CONSTITUTE ITS FINAL REVIEW OR APPROVAL. | | | | | | 15. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING | | | PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH | | | THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
3 |
Status |
P |
Date |
03-09-2023 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
03-09-2023 |
Time |
11:31 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
03-09-2023 |
Time |
11:31 |
Sent To |
|
|
| Notes |
| 2023-03-09 11:32:36 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: SCIENCE CENTER Z22110009 | | | MARCH 8, 2023 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | | | | 1. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE | | | TREES AND PALMS IN GOOD CONDITION TO BE PRESERVED ON | | | SITE OR RELOCATED. ANSI A 300 (PART 5) STANDARDS | | | SPECIFY EXAMPLES OF SUITABILITY RATINGS OF GOOD, | | | MODERATE, OR POOR FOR RELOCATION. PROVIDE AN ARBORISTS | | | REPORT RATING THE CONDITION AND RELOCATION POTENTIAL | | | FOR NATIVE TREES AND PALMS PROPOSED TO BE REMOVED. | | | | | | 2. SATISFIED. THE TREE DISPOSITION PLAN DOES NOT SHOW | | | SOME TREES FROM THE SURVEY. AFFECTED AREA LINE MUST BE | | | CLEAR ON THE LANDSCAPE PLAN TO INDICATE ALL TREES AND | | | SHOW THEY WILL REMAIN IN THE UNAFFECTED AREAS. | | | THERE ARE TREES NEAR THE SPLASH PAD THAT ARE NOT SHOWN | | | ON THE PLAN INCLUDING A LARGE LIVE OAK TREE. | | | | | | | | | 3. SATISFIED. PHASING PLAN NEEDS TO BE CLARIFIED. THERE | | | ARE FOUR CHARTS SHOWN ON THE TREE DISPOSITION PLAN THAT | | | NEED TO BE LABELED AS TO THE PHASING. | | | | | | 4. SATISFIED. ALL TREE SPECIES MUST BE IDENTIFIED ON | | | THE TREE DISPOSITION CHARTS, CANNOT BE LABELED AS | | | UNKNOWN. | | | THERE IS AT LEAST ONE TREE STILL NOT IDENTIFIED. | | | FURTHER REVIEW IS WARRANTED. | | | | | | 5. SATISFIED. CSPD ZONING REQUIRES 50% OPEN SPACE AREA | | | PER SECTION 94-203(B)(8), SO LANDSCAPE REQUIREMENTS | | | CHART NEEDS TO BE REVISED TO USE 228,690 SQ FT FOR | | | REQUIRED OPEN SPACE WITHIN THE LEASE LINE. | | | SQUARE FOOTAGE HAS BEEN CORRECTED BUT PERCENTAGE IS | | | STILL SHOWN AS 40%. REVISE. | | | | | | 6. SATISFIED. PER SECTION 94-443 (E)2., PROVIDE THE 30% | | | FOUNDATION PLANTING CALCULATION REQUIRED AND PROVIDED | | | FOR EACH BUILDING. | | | STYLES NICHOLSON STEM CENTER BUILDING NEEDS TO BE | | | SHOWN. | | | | | | 7. SATISFIED. PROVIDE THE CALCULATIONS SHOWING THE | | | NUMBER OF REQUIRED TREES IN THE PARKING AREAS AND HOW | | | THE 75% CATEGORY 1 SHADE TREE REQUIREMENT IS MET. | | | | | | 8. SATISFIED. INDICATE THE TERMINAL ISLAND TREE | | | ADJACENT TO THE ADA SPACES IN FRONT OF THE STYLES | | | NICHOLSON STEM CENTER. | | | | | | 9. SATISFIED. REQUIRED HEDGE IS MISSING ON THE NORTH | | | SIDE OF THE DUMPSTER ENCLOSURE PROPOSED TO BE LOCATED | | | EAST OF THE EXISTING BUILDING. | | | | | | | | | 10. SATISFIED. IF ANY ARTIFICIAL TURF AREAS ARE | | | PROPOSED OR EXISTING, THEY MUST MEET THE REQUIREMENTS | | | OF SECTION 94-451, INCLUDING ALL AREAS THAT ARE ALLOWED | | | BY CODE MUST NOT BE VISIBLE FROM A ROAD OR STREET. | | | | | | 11. SATISFIED. PROPOSED WATER AND SEWER AND DRAINAGE | | | LINES ON THE LANDSCAPE PLAN SHOW CONFLICTS WITH | | | REQUIRED TREES IN THE PARKING AREAS IN SEVERAL | | | LOCATIONS. ADJUST LOCATIONS OF UTILITY LINES TO RESOLVE | | | CONFLICTS WITH EXISTING AND PROPOSED TREES AND | | | LANDSCAPING. | | | ADDRESS THE FOLLOWING CONFLICTS: | | | ??? FIRE LINE AND HYDRANT IN CONFLICT WITH REQUIRED | | | TREE IN ISLAND SOUTH OF THE PROPOSED BUILDING, SHEET | | | LP-11. | | | ??? THERE ARE LOCATIONS EAST OF THE NEW BUILDING THAT | | | ARE SEVERELY LIMITING FOR TREES. RELOCATE UTILITIES | | | WHERE POSSIBLE. | | | ??? IRRIGATION LINE NORTH OF THE NEW BUILDING SHOULD BE | | | RELOCATED TO AVOID CONFLICT WITH THE TREE ROOT SYSTEM. | | | THIS WILL ALSO MAKE THE IRRIGATION LINE LESS LIKELY TO | | | REQUIRE MAINTENANCE IN THIS AREA. | | | | | | | | | 12. SATISFIED. PROVIDE THE 50 REQUIRED FLORIDA FRIENDLY | | | POINTS BASED ON THE FINAL PLANT LIST PER SECTION | | | 94-443(G). THE GROUND COVER LISTED ON THE PLANT LIST IS | | | NOT FLORIDA NATIVE, SO POINTS CANNOT BE TAKEN. | | | PROVIDE DETAILED ACCOUNTING OF WHERE THE ADDITIONAL | | | TREES ARE LOCATED FOR 6(B) OR REMOVE AND TAKE CREDITS | | | FOR ANY DROUGHT TOLERANT TREES OR SHRUBS IN 25-50% | | | CATEGORIES. | | | | | | 13. SATISFIED. PROVIDE SCREENING HEDGES AND SHOW | | | LOCATIONS FOR ALL GROUND MOUNTED VALVES AND EQUIPMENT | | | AND ADD A NOTE THAT ALL EQUIPMENT WILL BE SCREENED. | | | | | | 14. SATISFIED. EXPLAIN THE CHOICE OF PLATANUS | | | OCCIDENTALIS FOR THE PARKING LOT TREES. THIS IS AT THE | | | EXTREME SOUTHERN EDGE OF THE RANGE OF THIS SPECIES. | | | | | | THIS SPECIES HAS NOT BEEN SUCCESSFUL IN WEST PALM BEACH | | | AND IS RATED FOR HARDINESS LIMIT TO ZONE 9B. SOUTHEAST | | | PALM BEACH COUNTY IS NOW IN ZONE 10A PER THE CURRENT | | | USDA HARDINESS MAP AND IS PREDICTED TO CONTINUE TO | | | WARM. THIS SPECIES THEREFORE WILL BECOME EVEN LESS | | | SUSTAINABLE IN THE FUTURE. PLEASE CHOOSE A MORE | | | SUSTAINABLE SPECIES, AS THIS DOES NOT MEET THE INTENT | | | OF THE LANDSCAPE CODE REQUIREMENT. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | | | | 2. PRIOR TO ISSUANCE OF THE TREE ALTERATION PERMIT, | | | PARKS AND RECREATION DEPARTMENT SHALL REVIEW THE FINAL | | | TREE DISPOSITION PLAN FOR ANY CHANGES THAT MAY BE | | | PROPOSED. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
F |
Date |
01-17-2023 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
01-17-2023 |
Time |
17:18 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
01-17-2023 |
Time |
17:18 |
Sent To |
|
|
| Notes |
| 2023-01-17 17:19:04 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: SCIENCE CENTER Z22110009 | | | JANUARY 17, 2023 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | | | | 1. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE | | | TREES AND PALMS IN GOOD CONDITION TO BE PRESERVED ON | | | SITE OR RELOCATED. ANSI A 300 (PART 5) STANDARDS | | | SPECIFY EXAMPLES OF SUITABILITY RATINGS OF GOOD, | | | MODERATE, OR POOR FOR RELOCATION. PROVIDE AN ARBORISTS | | | REPORT RATING THE CONDITION AND RELOCATION POTENTIAL | | | FOR NATIVE TREES AND PALMS PROPOSED TO BE REMOVED. | | | | | | 2. PARTIALLY SATISFIED. THE TREE DISPOSITION PLAN DOES | | | NOT SHOW SOME TREES FROM THE SURVEY. AFFECTED AREA LINE | | | MUST BE CLEAR ON THE LANDSCAPE PLAN TO INDICATE ALL | | | TREES AND SHOW THEY WILL REMAIN IN THE UNAFFECTED | | | AREAS. | | | THERE ARE TREES NEAR THE SPLASH PAD THAT ARE NOT SHOWN | | | ON THE PLAN INCLUDING A LARGE LIVE OAK TREE. | | | | | | | | | 3. SATISFIED. PHASING PLAN NEEDS TO BE CLARIFIED. THERE | | | ARE FOUR CHARTS SHOWN ON THE TREE DISPOSITION PLAN THAT | | | NEED TO BE LABELED AS TO THE PHASING. | | | | | | 4. PARTIALLY SATISFIED. ALL TREE SPECIES MUST BE | | | IDENTIFIED ON THE TREE DISPOSITION CHARTS, CANNOT BE | | | LABELED AS UNKNOWN. | | | THERE IS AT LEAST ONE TREE STILL NOT IDENTIFIED. | | | FURTHER REVIEW IS WARRANTED. | | | | | | 5. PARTIALLY SATISFIED. CSPD ZONING REQUIRES 50% OPEN | | | SPACE AREA PER SECTION 94-203(B)(8), SO LANDSCAPE | | | REQUIREMENTS CHART NEEDS TO BE REVISED TO USE 228,690 | | | SQ FT FOR REQUIRED OPEN SPACE WITHIN THE LEASE LINE. | | | SQUARE FOOTAGE HAS BEEN CORRECTED BUT PERCENTAGE IS | | | STILL SHOWN AS 40%. REVISE. | | | | | | 6. PARTIALLY SATISFIED. PER SECTION 94-443 (E)2., | | | PROVIDE THE 30% FOUNDATION PLANTING CALCULATION | | | REQUIRED AND PROVIDED FOR EACH BUILDING. | | | STYLES NICHOLSON STEM CENTER BUILDING NEEDS TO BE | | | SHOWN. | | | | | | 7. SATISFIED. PROVIDE THE CALCULATIONS SHOWING THE | | | NUMBER OF REQUIRED TREES IN THE PARKING AREAS AND HOW | | | THE 75% CATEGORY 1 SHADE TREE REQUIREMENT IS MET. | | | | | | 8. SATISFIED. INDICATE THE TERMINAL ISLAND TREE | | | ADJACENT TO THE ADA SPACES IN FRONT OF THE STYLES | | | NICHOLSON STEM CENTER. | | | | | | 9. SATISFIED. REQUIRED HEDGE IS MISSING ON THE NORTH | | | SIDE OF THE DUMPSTER ENCLOSURE PROPOSED TO BE LOCATED | | | EAST OF THE EXISTING BUILDING. | | | | | | | | | 10. SATISFIED. IF ANY ARTIFICIAL TURF AREAS ARE | | | PROPOSED OR EXISTING, THEY MUST MEET THE REQUIREMENTS | | | OF SECTION 94-451, INCLUDING ALL AREAS THAT ARE ALLOWED | | | BY CODE MUST NOT BE VISIBLE FROM A ROAD OR STREET. | | | | | | 11. PARTIALLY SATISFIED. PROPOSED WATER AND SEWER AND | | | DRAINAGE LINES ON THE LANDSCAPE PLAN SHOW CONFLICTS | | | WITH REQUIRED TREES IN THE PARKING AREAS IN SEVERAL | | | LOCATIONS. ADJUST LOCATIONS OF UTILITY LINES TO RESOLVE | | | CONFLICTS WITH EXISTING AND PROPOSED TREES AND | | | LANDSCAPING. | | | ADDRESS THE FOLLOWING CONFLICTS: | | | ??? FIRE LINE AND HYDRANT IN CONFLICT WITH REQUIRED | | | TREE IN ISLAND SOUTH OF THE PROPOSED BUILDING, SHEET | | | LP-11. | | | ??? THERE ARE LOCATIONS EAST OF THE NEW BUILDING THAT | | | ARE SEVERELY LIMITING FOR TREES. RELOCATE UTILITIES | | | WHERE POSSIBLE. | | | ??? IRRIGATION LINE NORTH OF THE NEW BUILDING SHOULD BE | | | RELOCATED TO AVOID CONFLICT WITH THE TREE ROOT SYSTEM. | | | THIS WILL ALSO MAKE THE IRRIGATION LINE LESS LIKELY TO | | | REQUIRE MAINTENANCE IN THIS AREA. | | | | | | | | | 12. PARTIALLY SATISFIED. PROVIDE THE 50 REQUIRED | | | FLORIDA FRIENDLY POINTS BASED ON THE FINAL PLANT LIST | | | PER SECTION 94-443(G). THE GROUND COVER LISTED ON THE | | | PLANT LIST IS NOT FLORIDA NATIVE, SO POINTS CANNOT BE | | | TAKEN. | | | PROVIDE DETAILED ACCOUNTING OF WHERE THE ADDITIONAL | | | TREES ARE LOCATED FOR 6(B) OR REMOVE AND TAKE CREDITS | | | FOR ANY DROUGHT TOLERANT TREES OR SHRUBS IN 25-50% | | | CATEGORIES. | | | | | | 13. SATISFIED. PROVIDE SCREENING HEDGES AND SHOW | | | LOCATIONS FOR ALL GROUND MOUNTED VALVES AND EQUIPMENT | | | AND ADD A NOTE THAT ALL EQUIPMENT WILL BE SCREENED. | | | | | | 14. PARTIALLY SATISFIED. EXPLAIN THE CHOICE OF PLATANUS | | | OCCIDENTALIS FOR THE PARKING LOT TREES. THIS IS AT THE | | | EXTREME SOUTHERN EDGE OF THE RANGE OF THIS SPECIES. | | | | | | THIS SPECIES HAS NOT BEEN SUCCESSFUL IN WEST PALM BEACH | | | AND IS RATED FOR HARDINESS LIMIT TO ZONE 9B. SOUTHEAST | | | PALM BEACH COUNTY IS NOW IN ZONE 10A PER THE CURRENT | | | USDA HARDINESS MAP AND IS PREDICTED TO CONTINUE TO | | | WARM. THIS SPECIES THEREFORE WILL BECOME EVEN LESS | | | SUSTAINABLE IN THE FUTURE. PLEASE CHOOSE A MORE | | | SUSTAINABLE SPECIES, AS THIS DOES NOT MEET THE INTENT | | | OF THE LANDSCAPE CODE REQUIREMENT. | | | | | | | | | | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
12-07-2022 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
12-07-2022 |
Time |
10:53 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
12-07-2022 |
Time |
10:53 |
Sent To |
|
|
| Notes |
| 2022-12-07 10:57:23 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: SCIENCE CENTER Z22110009 | | | DECEMBER 6, 2022 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | | | | 1. SECTION 94-448 (D)(3) REQUIRES NATIVE TREES AND | | | PALMS IN GOOD CONDITION TO BE PRESERVED ON SITE OR | | | RELOCATED. ANSI A 300 (PART 5) STANDARDS SPECIFY | | | EXAMPLES OF SUITABILITY RATINGS OF GOOD, MODERATE, OR | | | POOR FOR RELOCATION. PROVIDE AN ARBORISTS REPORT RATING | | | THE CONDITION AND RELOCATION POTENTIAL FOR NATIVE TREES | | | AND PALMS PROPOSED TO BE REMOVED. | | | | | | 2. THE TREE DISPOSITION PLAN DOES NOT SHOW SOME TREES | | | FROM THE SURVEY. AFFECTED AREA LINE MUST BE CLEAR ON | | | THE LANDSCAPE PLAN TO INDICATE ALL TREES AND SHOW THEY | | | WILL REMAIN IN THE UNAFFECTED AREAS. | | | | | | 3. PHASING PLAN NEEDS TO BE CLARIFIED. THERE ARE FOUR | | | CHARTS SHOWN ON THE TREE DISPOSITION PLAN THAT NEED TO | | | BE LABELED AS TO THE PHASING. | | | | | | 4. ALL TREE SPECIES MUST BE IDENTIFIED ON THE TREE | | | DISPOSITION CHARTS, CANNOT BE LABELED AS UNKNOWN. | | | | | | 5. CSPD ZONING REQUIRES 50% OPEN SPACE AREA PER SECTION | | | 94-203(B)(8), SO LANDSCAPE REQUIREMENTS CHART NEEDS TO | | | BE REVISED TO USE 228,690 SQ FT FOR REQUIRED OPEN SPACE | | | WITHIN THE LEASE LINE. | | | | | | 6. PER SECTION 94-443 (E)2., PROVIDE THE 30% FOUNDATION | | | PLANTING CALCULATION REQUIRED AND PROVIDED FOR EACH | | | BUILDING. | | | | | | 7. PROVIDE THE CALCULATIONS SHOWING THE NUMBER OF | | | REQUIRED TREES IN THE PARKING AREAS AND HOW THE 75% | | | CATEGORY 1 SHADE TREE REQUIREMENT IS MET. | | | | | | 8. INDICATE THE TERMINAL ISLAND TREE ADJACENT TO THE | | | ADA SPACES IN FRONT OF THE STYLES NICHOLSON STEM | | | CENTER. | | | | | | 9. REQUIRED HEDGE IS MISSING ON THE NORTH SIDE OF THE | | | DUMPSTER ENCLOSURE PROPOSED TO BE LOCATED EAST OF THE | | | EXISTING BUILDING. | | | | | | | | | 10. IF ANY ARTIFICIAL TURF AREAS ARE PROPOSED OR | | | EXISTING, THEY MUST MEET THE REQUIREMENTS OF SECTION | | | 94-451, INCLUDING ALL AREAS THAT ARE ALLOWED BY CODE | | | MUST NOT BE VISIBLE FROM A ROAD OR STREET. | | | | | | 11. PROPOSED WATER AND SEWER AND DRAINAGE LINES ON THE | | | LANDSCAPE PLAN SHOW CONFLICTS WITH REQUIRED TREES IN | | | THE PARKING AREAS IN SEVERAL LOCATIONS. ADJUST | | | LOCATIONS OF UTILITY LINES TO RESOLVE CONFLICTS WITH | | | EXISTING AND PROPOSED TREES AND LANDSCAPING. | | | | | | 12. PROVIDE THE 50 REQUIRED FLORIDA FRIENDLY POINTS | | | BASED ON THE FINAL PLANT LIST PER SECTION 94-443(G). | | | THE GROUND COVER LISTED ON THE PLANT LIST IS NOT | | | FLORIDA NATIVE, SO POINTS CANNOT BE TAKEN. | | | | | | 13. PROVIDE SCREENING HEDGES AND SHOW LOCATIONS FOR ALL | | | GROUND MOUNTED VALVES AND EQUIPMENT AND ADD A NOTE THAT | | | ALL EQUIPMENT WILL BE SCREENED. | | | | | | 14. EXPLAIN THE CHOICE OF PLATANUS OCCIDENTALIS FOR THE | | | PARKING LOT TREES. THIS IS AT THE EXTREME SOUTHERN EDGE | | | OF THE RANGE OF THIS SPECIES. | | | | | | | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
PU |
PUBLIC UTILITIES |
| Rev No |
3 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
relizond |
Date |
03-17-2023 |
Time |
13:21 |
Sent To |
|
|
| Notes |
| 2023-03-17 13:25:56 | PLANS ARE ACCEPTABLE FROM A CONCEPTUAL STANDPOINT, | | | DESIGN DETAILS WILL NEED TO BE EXPLICITLY NOTED DURING | | | THE ENGINEERING SUBMITTAL. | | | | | | RICKY ELIZONDO | | | [email protected] |
|
|
| Review Stop |
PU |
PUBLIC UTILITIES |
| Rev No |
2 |
Status |
F |
Date |
01-06-2023 |
|
|
Cont ID |
|
| Sent By |
relizond |
Date |
01-06-2023 |
Time |
12:47 |
Rev Time |
0.00 |
| Received By |
relizond |
Date |
01-06-2023 |
Time |
12:47 |
Sent To |
|
|
| Notes |
| 2023-01-06 12:47:34 | COMMENTS FROM PREVIOUS REVIEW HAVE NOT BEEN ADDRESSED |
|
|
| Review Stop |
PU |
PUBLIC UTILITIES |
| Rev No |
1 |
Status |
F |
Date |
12-05-2022 |
|
|
Cont ID |
|
| Sent By |
relizond |
Date |
12-05-2022 |
Time |
14:53 |
Rev Time |
0.00 |
| Received By |
relizond |
Date |
12-05-2022 |
Time |
14:41 |
Sent To |
|
|
| Notes |
| 2022-12-05 14:51:41 | O PROVIDE VERTICAL DATUM AND DATUM CONVERSION | | | INFORMATION (NAVD 1988 AND NGVD 1929). | | | O SHOW PROJECT ADDRESS ON ALL PLAN SHEETS. | | | O PLANS SHALL SHOW EXISTING AND PROPOSED LOCATIONS AND | | | DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND | | | SEWER LINES AND CLEANOUTS, INCLUDING STUBS TO EACH | | | PROPERTY LINE FOR WATER AND SANITARY SEWERS, THE MAKE | | | AND MODEL OF ALL VALVES, POTABLE AND IRRIGATION METERS, | | | BACKFLOWS, FIRE HYDRANTS AND FDCS, AND OTHER DEVICES TO | | | BE INSTALLED ON THE SYSTEM, CATCH BASINS, CULVERTS, | | | DITCHES INCLUDING GRADES, PIPES SIZES, MATERIALS, | | | ELEVATIONS, ASSUMPTIONS, CALCULATIONS, INVERT | | | ELEVATIONS FOR ALL INLETS AND MANHOLES AND PROFILES OF | | | SANITARY SEWER LINES. | | | O GATE VALVE BOXES SHALL NOT BE INSTALLED IN CURB OR | | | SIDEWALK. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE | | | PROFILE VIEW. | | | O DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN | | | VIEW FOR ALL SANITARY AND STORM SEWERS. | | | O SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT | | | MATERIAL. | | | O PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED | | | UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC, | | | ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION | | | FACILITIES INCLUDING PIPE SIZE AND MATERIAL LOCATED IN | | | THE RIGHT-OF-WAY. | | | O PROVIDE PROFILE AND CLEARANCES BETWEEN WATER, SEWER | | | AND STORM LINES PER CITY OF WEST PALM BEACH STANDARD | | | DETAIL GN-2 SERIES, AT ALL UTILITY CROSSINGS. PLEASE | | | INCLUDE FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION & | | | TELECOMMUNICATION FACILITIES INCLUDING PIPE SIZE AND | | | MATERIAL LOCATED IN THE RIGHT-OF-WAY. | | | O SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE DIRECTLY | | | TO ENGINEERING (SHEET 33 OF CITY OF WPB DEVELOPMENT | | | APPLICATION). PROVIDE CALCULATIONS ON PLANS OF EXISTING | | | AND PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, | | | MAXIMUM AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS | | | SHALL BE PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 | | | FOR WATER. | | | O PROVIDE FIRE FLOW TEST DATA. | | | O PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER ALONG | | | ENTIRE PROJECT FRONTAGE WHERE CONNECTION IS PROPOSED | | | (CONDITION OF SITE PLAN APPROVAL). | | | O CUT AND CAP UTILITIES NOT IN USE AND REMOVE ANY | | | ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY | | | ROW. | | | O WHEN PROPOSED, WATER MAINS IN CITY RIGHT OF WAY SHALL | | | BE MADE OF DUCTILE IRON PIPE (NOT PVC) AND SPECIFY | | | PROPOSED LENGTH IN FEET. | | | O CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY | | | SEWER ARE REQUIRED. | | | O PROVIDE CLEANOUTS FOR PROPOSED SANITARY LINE ONSITE | | | JUST INSIDE PROPERTY LINE, AT JOINTS AND EVERY 75 FEET. | | | O ADD NOTE TO PLANS SPECIFYING CITY???S DOWNSTREAM LIFT | | | STATION NUMBER. (AREA SERVES LIFT STATION 4) | | | O PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR | | | PROPOSED SANITARY LATERALS. | | | O LABEL WATER LINES AS PRIVATE WHERE APPLICABLE. | | | O PLEASE SHOW AND LABEL EXISTING AND PROPOSED GREASE | | | TRAPS (IF ANY). | | | O PER CITY STANDARDS MAINTAIN MINIMUM DISTANCE BETWEEN | | | OUTSIDE DIAMETER OF CITY PIPE AND ROOT BARRIER. | | | O EXISTING MANHOLES THAT ARE PROPOSED TO HAVE NEW | | | CONNECTIONS WILL NEED TO BE REHABBED | | | O CALL OUT MATERIAL PROPOSED FOR USE FOR BOTH WATER AND | | | SEWER | | | O CALL OUT SEWER MANHOLES AND PROPOSED INVERT | | | ELEVATIONS | | | O CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA (MAKE | | | NOTE USC APPROVED) AND FIRE BACKFLOW PREVENTER AS DCDA. |
|
|
| Review Stop |
PU-CS |
PUBLIC UTILITIES CUSTOMER SRVC |
| Rev No |
5 |
Status |
P |
Date |
03-17-2023 |
|
|
Cont ID |
|
| Sent By |
mhurley |
Date |
03-17-2023 |
Time |
15:21 |
Rev Time |
0.00 |
| Received By |
mhurley |
Date |
03-17-2023 |
Time |
15:21 |
Sent To |
|
|
| Notes |
| 2023-03-17 15:19:23 | APPLICANT ADVISED A GATE WAS NOT SHOWN ACCURATELY ON | | | ENGINEERING PLANS. UPDATE LOCATION OF GATE ON | | | ENGINEERING PLANS TO CORRECT LOCATION AT ENGINEERING | | | DEVELOPMENT SUBMITTAL. PROPOSED DAYS AND TIMES OF | | | CLOSURE WILL ALSO BE REVIEWED AT THAT TIME TO ENSURE | | | WPB UTILITY PERSONNEL WILL HAVE ADEQUATE ACCESS FOR | | | THEIR WORK. |
|
|
| Review Stop |
PU-CS |
PUBLIC UTILITIES CUSTOMER SRVC |
| Rev No |
4 |
Status |
F |
Date |
03-02-2023 |
|
|
Cont ID |
|
| Sent By |
mhurley |
Date |
03-02-2023 |
Time |
16:14 |
Rev Time |
0.00 |
| Received By |
mhurley |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2023-03-02 16:12:39 | PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING: | | | | | | -THE FOLLOWING REVIEW COMMENT WAS NOT RESPONDED TO | | | FULLY. ALSO THE SHEETS ARE SHEET NOT MATCHING WITH | | | RESPECT TO THE ROAD GATES. PLEASE ANSWER FULLY, AND | | | MAKE SURE ALL THE ROADWAY GATES ARE SHOWN SIMILARLY ON | | | ALL THE DIFFERENT PLAN SETS: | | | (THERE ARE SEVERAL GATES SHOWN ON PLANS, BUT THREE ARE | | | SHOWN ON ARCHITECTURAL PLANS AND TWO SHOWN ON OTHER | | | PLAN SETS. PLEASE ENSURE ALL PLAN SETS HAVE THE SAME | | | GATES SHOWN AND INDICATE IF THEY ARE EXISTING OR | | | PROPOSED. UTILITIES PERSONNEL NEEDS ACCESS FOR | | | MAINTENANCE, METER READING, EMERGENCIES, AND | | | INSPECTIONS. INDICATE PROPOSED DAYS AND TIMES THAT | | | GATES WOULD BE CLOSED AND IF THAT WOULD IMPEDE ACCESS | | | TO WPB UTILITIES PERSONNEL TO ANY AREAS WITH CITY | | | UTILITY INFRASTRUCTURE | | | RESPONSE: ACKNOWLEDGED. ALL SHEETS HAVE BEEN CORRECTED | | | TO MATCH) | | | | | | -ENGINEERING PLAN SET MISSING FROM RESUBMITTAL PACKAGE. | | | PLEASE INCLUDE IN NEXT RESUBMITTAL. | | | | | | RESPECTFULLY, | | | MARK HURLEY [email protected] |
|
|
| Review Stop |
PU-CS |
PUBLIC UTILITIES CUSTOMER SRVC |
| Rev No |
3 |
Status |
F |
Date |
02-22-2023 |
|
|
Cont ID |
|
| Sent By |
mhurley |
Date |
02-22-2023 |
Time |
12:26 |
Rev Time |
0.00 |
| Received By |
mhurley |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2023-02-22 12:26:00 | THE FOLLOWING REVIEW COMMENT WAS NOT RESPONDED TO | | | FULLY. ALSO THE PLAN SHEETS ARE NOT MATCHING WITH | | | RESPECT TO THE ROAD GATES. PLEASE ANSWER FULLY, AND | | | MAKE SURE ALL THE ROADWAY GATES ARE SHOWN SIMILARLY ON | | | ALL THE DIFFERENT PLAN SETS: | | | (THERE ARE SEVERAL GATES SHOWN ON PLANS, BUT THREE ARE | | | SHOWN ON ARCHITECTURAL PLANS AND TWO SHOWN ON OTHER | | | PLAN SETS. PLEASE ENSURE ALL PLAN SETS HAVE THE SAME | | | GATES SHOWN AND INDICATE IF THEY ARE EXISTING OR | | | PROPOSED. UTILITIES PERSONNEL NEEDS ACCESS FOR | | | MAINTENANCE, METER READING, EMERGENCIES, AND | | | INSPECTIONS. INDICATE PROPOSED DAYS AND TIMES THAT | | | GATES WOULD BE CLOSED AND IF THAT WOULD IMPEDE ACCESS | | | TO WPB UTILITIES PERSONNEL TO ANY AREAS WITH CITY | | | UTILITY INFRASTRUCTURE | | | RESPONSE: ACKNOWLEDGED. ALL SHEETS HAVE BEEN CORRECTED | | | TO MATCH) | | | RESPECTFULLY, | | | MARK HURLEY [email protected] |
|
|
| Review Stop |
PU-CS |
PUBLIC UTILITIES CUSTOMER SRVC |
| Rev No |
2 |
Status |
F |
Date |
01-03-2023 |
|
|
Cont ID |
|
| Sent By |
mhurley |
Date |
01-03-2023 |
Time |
16:50 |
Rev Time |
0.00 |
| Received By |
mhurley |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2023-01-03 16:50:43 | PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING: | | | -ENSURE THAT ALL FDC???S ARE ACCEPTABLE DISTANCE TO | | | FIRE HYDRANTS. | | | -UPDATE LANDSCAPING PLANS WITH THE MOST RECENT REVISION | | | OF UTILITIES. UTILITIES CURRENTLY SHOWN ON LANDSCAPING | | | PLANS APPEAR TO BE OLD LOCATIONS. ONCE COMPLETE, ENSURE | | | THAT LANDSCAPING AND UTILITIES ARE ADEQUATELY DISTANCED | | | FROM EACH OTHER. | | | -THERE ARE SEVERAL GATES SHOWN ON PLANS, BUT THREE ARE | | | SHOWN ON ARCHITECTURAL PLANS AND TWO SHOWN ON OTHER | | | PLAN SETS. PLEASE ENSURE ALL PLAN SETS HAVE THE SAME | | | GATES SHOWN AND INDICATE IF THEY ARE EXISTING OR | | | PROPOSED. UTILITIES PERSONNEL NEEDS ACCESS FOR | | | MAINTENANCE, METER READING, EMERGENCIES, AND | | | INSPECTIONS. INDICATE PROPOSED DAYS AND TIMES THAT | | | GATES WOULD BE CLOSED AND IF THAT WOULD IMPEDE ACCESS | | | TO WPB UTILITIES PERSONNEL TO ANY AREAS WITH CITY | | | UTILITY INFRASTRUCTURE. | | | RESPECTFULLY, | | | MARK HURLEY [email protected] |
|
|
| Review Stop |
PU-CS |
PUBLIC UTILITIES CUSTOMER SRVC |
| Rev No |
1 |
Status |
F |
Date |
12-04-2022 |
|
|
Cont ID |
|
| Sent By |
mhurley |
Date |
12-04-2022 |
Time |
10:02 |
Rev Time |
0.00 |
| Received By |
mhurley |
Date |
12-04-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-12-04 10:02:41 | PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING: | | | -PLANS SHOW BUILDING OF STRUCTURES IN FPL EASEMENT IN | | | THE SOUTHWEST AREA OF PROJECT. IS THAT ALRIGHT WITH | | | FPL? | | | -THERE IS A STOP SIGN TOO CLOSE TO PROPOSED WATER | | | SERVICE ON CIVIL PLANS. PLEASE INCREASE THE HORIZONTAL | | | CLEARANCE DISTANCE BETWEEN THEM. | | | -CALLOUT SIZE OF PROPOSED WATER METER AND PROPOSED | | | FIRELINE BACKFLOW ASSEMBLY. | | | -CIVIL PLANS SHOW PROPOSED SANITARY SEWER AND | | | STORMWATER CONSTRUCTION IN WESTERN FPL EASEMENT AS WELL | | | AS PARKING SPOTS. IS THAT ALRIGHT WITH FPL? | | | -EXISTING BE AND IRR SHOWING RUNNING UNDERNEATH | | | PROPOSED CHILLER ENCLOSURE. | | | -CIVIL PLANS SHOW EXISTING WATER METER AT FAR NORTH | | | SIDE. SHOW THE EXISTING WATER SERVICE LINE FOR IT. | | | -MASTER SITE PLAN SHOWS A GATE NEAR THE NORTHWEST SIDE | | | OF FPL FACILITY. THIS WAS ALSO MENTIONED IN | | | JUSTIFICATION DOCUMENT. PLANS DO NOT CLEARLY SHOW | | | PROPERTY LINES THERE AND PROPERTY APPRAISER SEEMS TO | | | SHOW IT EITHER IN STATE RIGHT OF WAY OR FPL PROPERTY. | | | -IS THERE A CURRENT ACCESS AGREEMENT OR EASEMENT ACROSS | | | THE FPL STATION PROPERTY FOR VEHICLE TRAFFIC? | | | -SURVEY SHOWS RESTRICTIVE COVENANT AND SOLAR AREA WHERE | | | LAKE EXPANSION IS PROPOSED. WOULD THE RESTRICTIVE | | | COVENANT AND SOLAR AREA PREVENT THAT CONSTRUCTION? | | | -SURVEY SHOWS NEGATIVE PLEDGE AGREEMENT AND RESTRICTIVE | | | COVENANT. WOULD THAT PREVENT ANY OF THE CONSTRUCTION OF | | | BLDG. 3 OR 1? | | | -THE LABELING OF THE FPL EASEMENTS ON THE SURVEY AND | | | CIVIL PLANS AT THE SOUTHWEST AREA OF THE PROPERTY DO | | | NOT MATCH. PLEASE VERIFY POSITIONING AND UPDATE PLANS. | | | -LABEL THE NEW GENERATOR ENCLOSURE ON CIVIL PLANS. | | | -WHERE WILL THE WASTEWATER FROM THE PROPOSED CITY OF | | | WPB RESTROOM GO? | | | -WHY IS THERE A PROPOSED SAND/OIL SEPARATOR NEAR NORTH | | | SIDE OF PROPOSED SANITARY SEWER SYSTEM? | | | -WHERE DOES THE WASTEWATER FROM THE PROPOSED PRIVATE | | | LIFT STATION GO? SHOW AND LABEL FORCE MAIN. | | | -DOES THE CHILLER ENCLOSURE NEED A SEPARATE METERED | | | WATER SERVICE? | | | -SIDEWALK LOCATION AT EASTERN SIDE DOES NOT MATCH | | | BETWEEN CIVIL PLAN AND MASTER SITE PLAN. IN PARTICULAR, | | | THE AREA NEAR WHERE POLE IS PROPOSED TO BE RELOCATED ON | | | MSP. PLEASE MAKE SURE ALL THE DIFFERENT PLANS MATCH THE | | | GENERAL LAYOUT. | | | -RELOCATED WATER SERVICE FOR BUILDING 5 MUST HAVE AN RP | | | BACKFLOW ASSEMBLY. PLEASE SHOW THAT SYMBOL ON CIVIL | | | PLAN. | | | -NO NEW VALVES ARE SHOWN ON PROPOSED WATER MAIN. ADD | | | GATE VALVES. | | | -DOES THE PRIVATE LIFT STATION NEED A METERED WATER | | | SERVICE? | | | -ADD WATER AND SEWER DEMAND CALCULATIONS TO CIVIL | | | PLANS. | | | -WPB GIS IS SHOWING 6 INCH WATER MAIN PIPE SECTION NEAR | | | EAST SIDE OF LEASE AREA. PLEASE VERIFY SIZING AND SHOW | | | ON PLANS. MAY NEED TO INCREASE PIPE SIZE IF PROPOSED | | | WATER SERVICES ARE LARGE DIAMETER. | | | -ON SHEET LP10, SHOW EXISTING AND PROPOSED UTILITIES | | | NEAR THE EAST SIDE. MISSING AT LEAST THE EXISTING WATER | | | MAIN, SANITARY SEWER PIPE, AND PROPOSED RELOCATED | | | METERED WATER SERVICE FOR BLDG. 5. | | | -ON SHEET LP11, SHOW EXISTING AND PROPOSED UTILITIES. | | | AT LEAST THE WATER MAIN IS MISSING. | | | -UPDATE LANDSCAPING PLANS WITH THE MOST RECENT REVISION | | | OF UTILITIES FROM CIVIL PLANS. | | | -JUSTIFICATION STATEMENT MENTIONED CHILLER ENCLOSURE | | | WILL HOUSE A FIRE PUMP AND TANK. PLEASE PROVIDE MORE | | | INFORMATION ON THE TANK, AND VERIFY IF ANY OF THE | | | PRIVATE FIRE SYSTEMS WILL HAVE AUXILIARY WATER SYSTEM | | | OR TANKS CONNECTED TO THEM. | | | -CIVIL PLANS SAID THERE IS A WELL PUMP. IS THAT WHERE | | | IRRIGATION WATER WILL COME FROM? | | | RESPECTFULLY, | | | MARK HURLEY [email protected] |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
4 |
Status |
P |
Date |
03-17-2023 |
|
|
Cont ID |
|
| Sent By |
|
Date |
03-17-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
03-17-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-03-17 09:25:45 | CONDITION OF APPROVAL: | | | | | | THE FINAL SITE PLAN SHALL BE UPDATED TO REFLECT THE | | | REVISED LLOCATION AND ORIENTATION OF THE WEST DOUBLE | | | DUMPSTER ENCLOSURES TO 45 DEG. NW. | | | | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
3 |
Status |
F |
Date |
03-08-2023 |
|
|
Cont ID |
|
| Sent By |
|
Date |
03-08-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
03-08-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-03-08 13:09:33 | PLEASE REVISE THE SITE PLAN AND AUTO TURN FOR THE | | | SANITATION COLLECTION (FRONT LOAD) TRUCK TO REFLECT THE | | | PREFERRED LOCATION AND ORIENTATION OF THE WEST DUMPSTER | | | ENCLOSURES TO 45 DEG. NW MINIMIZING THE BACKUP | | | MOVEMENTS AND SHORT TURN RADII FOR THE SANITATION | | | COLLECTION VEHICLE. | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
2 |
Status |
F |
Date |
02-02-2023 |
|
|
Cont ID |
|
| Sent By |
|
Date |
02-02-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
02-02-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-02-02 11:33:29 | | | | 1- PLEASE PROVIDE LOS (LEVEL OF SERVICE ANALYSIS) TO | | | REFLECT THE SOLID WASTE VOLUME PRODUCED ALONG WITH THE | | | SIZE, TYPE AND QUANTITY OF THE CONTAINER (I.E. | | | DUMPSTER/COMPACTOR) THAT WILL BE UTILIZED FOR THE | | | SANITATION SERVICE. | | | 2- PLEASE PROVIDE DUMPSTER ENCLOSURE DETAIL. DETAILS | | | FOR SANITATION SERVICE (I.E. SOLID WASTE CONTAINER(S) | | | TYPE, COLLECTION LOCATION, ETC.). FOR A FREESTANDING | | | SITE DUMPSTER ENCLOSURE, THE ENCLOSURE SHALL COMPLY | | | WITH THE LATEST REVISION OF CITY OF WEST PALM BEACH | | | GENERAL CONSTRUCTION-GARBAGE ENCLOSURE STANDARD, GC-7. | | | (LINK TO THE LATEST REVISION OF THE GC-7 DOCUMENT: | | | HTTPS://WWW.W | | | PB.ORG/HOME/SHOWPUBLISHEDDOCUMENT/3690/6376290604221000 | | | 00) | | | 3- OWNERS AND/OR OCCUPANTS OF PROPERTY THAT REQUIRE | | | GREASE HAULING SERVICES SHALL ENSURE THAT THEIR GREASE | | | TANKS OR CONTAINERS REMAIN CLEAN, AND ARE ENCLOSED AND | | | NOT IN PUBLIC VIEW. | | | | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 | | | |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
F |
Date |
12-05-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
12-05-2022 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
12-05-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-12-05 08:34:44 | | | | PLEASE PROVIDE THE FOLLOWINGS: | | | 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID | | | WASTE VOLUME PRODUCED ALONG WITH THE SIZE, TYPE AND | | | QUANTITY OF THE CONTAINER (I.E. DUMPSTER/COMPACTOR) | | | THAT WILL BE UTILIZED FOR THE SANITATION SERVICE. | | | 2- DUMPSTER ENCLOSURE DETAIL. DETAILS FOR SANITATION | | | SERVICE (I.E. SOLID WASTE CONTAINER(S) TYPE, COLLECTION | | | LOCATION, ETC.). FOR A FREESTANDING SITE DUMPSTER | | | ENCLOSURE, THE ENCLOSURE SHALL COMPLY WITH THE LATEST | | | REVISION OF CITY OF WEST PALM BEACH GENERAL | | | CONSTRUCTION-GARBAGE ENCLOSURE STANDARD, GC-7. (LINK TO | | | THE LATEST REVISION OF THE GC-7 DOCUMENT: HTTPS://WWW.W | | | PB.ORG/HOME/SHOWPUBLISHEDDOCUMENT/3690/6376290604221000 | | | 00) | | | 3- AUTOTURN EXHIBIT WITH DYNAMIC ENVELOPE AND THE | | | VEHICLE???S WHEEL PATH IDENTIFIED WITH DIFFERENT COLORS | | | FOR THE SANITATION SERVICE, FRONT LOADER TRUCK WITH THE | | | FOLLOWING SPECS: | | | - DUAL AXLES | | | - TRUCK LENGTH: 35 FT | | | - TRUCK WIDTH: 11 FT | | | - TURNING RADIUS: | | | - SAE TURNING RADIUS: 32.5 FT | | | - CURB-TO-CURB DIAMETER: 74 FT | | | - WALL-TO-WALL DIAMETER: 86.3 FT | | | 4- IN CASE OF PROPOSING ADDITION OF ANY NEW CAN(S) IN | | | THE CITY`S RIGHT-OF-WAY , THE LOCATION AND QUANTITY OF | | | THE CAN(S) SHALL BE REVIEWED AND APPROVED BY PUBLIC | | | WORKS DEPARTMENT AND THE CAN(S) SHALL BE TYPE, SIZE AND | | | COLOR APPROVED BY PUBLIC WORKS DEPARTMENT. THE BUILDING | | | MAINTENANCE IS RESPONSIBLE TO MAINTAIN AND SERVICE THE | | | CAN(S). | | | 5- ALL THE PARKING STALL PAINTING SHALL COMPLY WITH THE | | | CITY`S MUNICIPAL CODE SECTION 94-485 AND FLORIDA | | | STATUES [553.5041 F.S.]. | | | 6- SIGNAGE PLAN. ALL STRIPING AND SIGNAGE SHALL COMPLY | | | WITH THE LATEST CITY OF WEST PALM BEACH STANDARD | | | DETAILS AND MEET THE M.U.T.C.D. LATEST EDITION. | | | 7- ALL PAVEMENT MARKING , SIGNING AND SIDEWALK DAMAGED | | | DURING CONSTRUCTION SHALL BE RESTORED. | | | | | | | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
P |
Date |
03-17-2023 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
03-17-2023 |
Time |
10:07 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
03-17-2023 |
Time |
10:07 |
Sent To |
|
|
| Notes |
| 2023-03-17 10:07:28 | TJHE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 2/16/2023 SUBMITTAL: | | | | | | | | | 1. [SATISFIED] THE CITY'S OFFICIAL VERTICAL DATUM IS | | | NGVD1929. THE CITY HAS ALLOWED THE USE OF NAVD1988 AS | | | LONG AS THE CONVERSION EQUATION TO NGVD1929 AT THE | | | PROJECT LOCATION IS PROVIDED. PROVIDE VERTICAL DATUM | | | REFERENCE AND CONVERSION TO NGVD1929 ON EVERY SHEET | | | WITH ELEVATION INFORMATION. | | | | | | 2. [SATISFIED] ORIENT THE NORTH ARROW IN THE CORRECT | | | DIRECTION ON THE CONCEPTUAL PAVING, DRAINAGE, WATER AND | | | WASTEWATER PLAN. | | | | | | 3. [PARTIALLY SATISFIED - RESPONSE INDICATED FINAL | | | DESIGN TO CONSIDER THE COMMENT] CONSIDER REDUCING THE | | | AMOUNT OF DRAINAGE STRUCTURES BY SLOPING THE PARKING | | | LOTS NORTH OF THE PARK ACCESS ROAD (SOUTH OF BUILDING | | | 5) SOUTHWARD TO FLOW INTO THE LANDSCAPE AREA BETWEEN | | | THE PARKING LOT AND ROADWAY. THE LANDSCAPE SPACE WILL | | | PROVIDE MORE WATER QUALITY TREATMENT THAN IF THE INLETS | | | WERE WITHIN THE PARKING LOT. | | | | | | 4. [SATISFIED - SFWMD TO APPROVE WQ TREATMENT METHOD] | | | WHERE IS STORMWATER QUALITY TREATMENT BEING PROVIDED? | | | PREVIOUS IMPROVEMENTS AT THE SCIENCE CENTER UTILIZED | | | EXFILTRATION TRENCH. | | | | | | 5. [SATISFIED] THE CITY DOES NOT ALLOW THE USE OF | | | BLEEDERS IN NEW EXFILTRATION SYSTEMS. | | | | | | 6. [SATISFIED] ARE SIDEWALKS NEEDED ON BOTH SIDES OF | | | THE ACCESS ROADWAY? CONSIDER ONLY ONE 6-FEET WIDE | | | (EXCLUSIVE OF PARKING OVERHANG) SIDEWALK ON ONLY ONE | | | SIDE OF THE ACCESS ROADWAY. | | | | | | 7. [SATISFIED] SHOW EXISTING AND PROPOSED TOP OF BANKS | | | FOR THE LAKES. | | | | | | 8. [NOT SATISFIED - RESPONSE INDICATED THE CROSS | | | SECTIONS WILL BE PROVIDED WITH FINAL DESIGN] PROVIDE | | | CROSS SECTIONS FOR: | | | A. LAKE EXPANSION | | | B. PARKING LOTS | | | C. ROADWAY (WITH AND WITHOUT PARKING) | | | | | | 9. [NOT SATISFIED - DEMOLITION PHASING SHOULD NOT | | | AFFECT THE SITE PLAN] PROVIDE PHASING DEMOLITION PLANS. | | | | | | 10. [NOT SATISFIED RESPONSE INDICATED INFORMATION WILL | | | BE PROVIDED WITH FINAL DESIGN] PROVIDE EXISTING AND | | | PROPOSED SPOT GRADES FOR THE ROADWAY, PARKING LOTS AND | | | LANDSCAPE AREAS. | | | | | | 11. [NOT SATISFIED - RESPONSE INDICATED INFORMATION | | | WILL BE PROVIDED WITH THE FINAL DESIGN] PROVIDE CURRENT | | | SFWMD STAGE CRITERIA FOR SETTING MINIMUM ROAD | | | ELEVATION, PERIMETER BERMS, FINISHED FLOOR ELEVATIONS. | | | | | | 12. [SATISFIED] THE PROPERTY IS WITHIN AN AE SPECIAL | | | FLOOD HAZARD AREA WITH BASE FLOOD ELEVATION OF 12.2 | | | FEET NAVD. STRUCTURES WITHIN A SPECIAL FLOOD HAZARD | | | AREA ARE TO HAVE A MINIMUM OF 2 FEET OF FREEBOARD ABOVE | | | THE BASE FLOOD ELEVATION. | | | | | | 13. [NOT SATISFIED] ON SHEET 8 OF 10 OF THE SURVEY, THE | | | SCALE IS INCORRECTLY LABELED IN THE TITLE BLOCK (1 INCH | | | = 20 FEET) AND ON THE SCALE BAR (1 INCH = 100 FEET). | | | THE CORRECT SCALE APPEARS TO BE 1 INCH = 50 FEET. | | | | | | NEW COMMENTS (2/13/2023 SUBMITTAL): | | | 14. EOR INFORMED STAFF THAT SFWMD C-51 100-YEAR FLOOD | | | STAGE IS HIGHER THAN THE FEMA BASE FLOOD ELEVATION. THE | | | BUILDING OFFICIAL SHOULD BE CONSULTED AS TO WHICH FLOOD | | | ELEVATION THE FREEBOARD IS TO BE APPLIED TO. | | | | | | 15. THE BUIDLING OFFICIAL SHOULD BE CONSULTED TO | | | DETERMINE IF THE PROPOSED EXPANSION WILL TRIGGER THE | | | "SUBSTANTIAL IMPROVEMENT" NEED FOR FLOOD PROTECTING THE | | | EXISTING BUILDINGS. | | | | | | CONDITIONS FOR SITE PLAN APPROVAL: | | | 1. NO SPOT GRADES OR CROSS SECTIONS WERE PROVIDED. WHEN | | | THIS INFORMATION IS PROVIDED DURING FINAL ENGINEERING | | | DESIGN, IT MAY AFFECT THE SITE PLAN AND A SITE PLAN | | | AMENDMENT MAY BE NECESSARY. | | | | | | 2. SURVEY SCALES ON SHEET 8 OF 10 OF THE SURVEY NEEDS | | | TO BE CORRECTED. | | | | | | 3. EXISTING BUILDINGS MAY NEED TO BE BROUGHT INTO | | | COMPLIANCE WITH THE CITY'S FLOOD PROTECTION | | | REQUIREMENTS IF THE PROPOSED EXPANSION WILL BE | | | CONSIDERED A SUBSTANTIAL IMPROVEMENT FOR THE EXSITING | | | BUILDINGS. | | | | | | 4. FFE ELEVATION TO BE SET ACCORDING THE FLOOD SET | | | ACCORDING TO THE FLOOD STAGE THAT THE DEVELOPMENTAL | | | SERVICES DEPARTMENT CONSIDERS AS THE BASE FLOOD | | | ELEVATION (FEMA FIRM OR SFWMD C-51 BASIN CRITERIA). | | | | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
12-15-2022 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
12-15-2022 |
Time |
16:55 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
12-15-2022 |
Time |
16:56 |
Sent To |
|
|
| Notes |
| 2022-12-15 16:56:46 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL. PROVIE A WRITTEN RESPONSE ON HOW EACH | | | COMMENT WAS ADDRESSED. | | | | | | 1. THE CITY???S OFFICIAL VERTICAL DATUM IS NGVD1929. | | | THE CITY HAS ALLOWED THE USE OF NAVD1988 AS LONG AS THE | | | CONVERSION EQUATION TO NGVD1929 AT THE PROJECT LOCATION | | | IS PROVIDED. PROVIDE VERTICAL DATUM REFERENCE AND | | | CONVERSION TO NGVD1929 ON EVERY SHEET WITH ELEVATION | | | INFORMATION. | | | | | | 2. ORIENT THE NORTH ARROW IN THE CORRECT DIRECTION ON | | | THE CONCEPTUAL PAVING, DRAINAGE, WATER AND WASTEWATER | | | PLAN. | | | | | | 3. CONSIDER REDUCING THE AMOUNT OF DRAINAGE STRUCTURES | | | BY SLOPING THE PARKING LOTS NORTH OF THE PARK ACCESS | | | ROAD (SOUTH OF BUILDING 5) SOUTHWARD TO FLOW INTO THE | | | LANDSCAPE AREA BETWEEN THE PARKING LOT AND ROADWAY. THE | | | LANDSCAPE SPACE WILL PROVIDE MORE WATER QUALITY | | | TREATMENT THAN IF THE INLETS WERE WITHIN THE PARKING | | | LOT. | | | | | | 4. WHERE IS STORMWATER QUALITY TREATMENT BEING | | | PROVIDED? PREVIOUS IMPROVEMENTS AT THE SCIENCE CENTER | | | UTILIZED EXFILTRATION TRENCH. | | | | | | 5. THE CITY DOES NOT ALLOW THE USE OF BLEEDERS IN NEW | | | EXFILTRATION SYSTEMS. | | | | | | 6. ARE SIDEWALKS NEEDED ON BOTH SIDES OF THE ACCESS | | | ROADWAY? CONSIDER ONLY ONE 6-FEET WIDE (EXCLUSIVE OF | | | PARKING OVERHANG) SIDEWALK ON ONLY ONE SIDE OF THE | | | ACCESS ROADWAY. | | | | | | 7. SHOW EXISTING AND PROPOSED TOP OF BANKS FOR THE | | | LAKES. | | | | | | 8. PROVIDE CROSS SECTIONS FOR: | | | A. LAKE EXPANSION | | | B. PARKING LOTS | | | C. ROADWAY (WITH AND WITHOUT PARKING) | | | | | | 9. PROVIDE PHASING DEMOLITION PLANS. | | | | | | 10. PROVIDE EXISTING AND PROPOSED SPOT GRADES FOR THE | | | ROADWAY, PARKING LOTS AND LANDSCAPE AREAS. | | | | | | 11. PROVIDE CURRENT SFWMD STAGE CRITERIA FOR SETTING | | | MINIMUM ROAD ELEVATION, PERIMETER BERMS, FINISHED FLOOR | | | ELEVATIONS. | | | | | | 12. THE PROPERTY IS WITHIN AN AE SPECIAL FLOOD HAZARD | | | AREA WITH BASE FLOOD ELEVATION OF 12.2 FEET NAVD. | | | STRUCTURES WITHIN A SPECIAL FLOOD HAZARD AREA ARE TO | | | HAVE A MINIMUM OF 2 FEET OF FREEBOARD ABOVE THE BASE | | | FLOOD ELEVATION. | | | 12. ON SHEET 8 OF 10 OF THE SURVEY, THE SCALE IS | | | INCORRECTLY LABELED IN THE TITLE BLOCK (1 INCH = 20 | | | FEET) AND ON THE SCALE BAR (1 INCH = 100 FEET). THE | | | CORRECT SCALE APPEARS TO BE 1 INCH = 50 FEET. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP | | | CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH | | | THE ENGINEERING PERMIT SUBMITTAL. | | | | | | 2. PROVIDE COPY OF SFWMD ERP PERMIT MODIFICATION BEFORE | | | START OF CONSTRUCTION. NOTE SITE IS WITHIN THE C-51 | | | DRAINAGE BASIN. | | | | | | 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE | | | ENGINEERING PERMIT SUBMITTAL. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
P |
Date |
03-16-2023 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
03-16-2023 |
Time |
06:37 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
11-28-2022 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
11-28-2022 |
Time |
09:08 |
Rev Time |
|
| Received By |
vnoel |
Date |
11-28-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-11-28 10:51:13 | 1. SURVEY NEEDS TO BE SIGNED/SEALED. | | | 2. PROVIDE COPY OF TITLE REPORT. | | | 3. LAYOUT OF WATER/SEWER WILL REQUIRE FURTHER REVIEW. | | | 4. SHOW PROPOSED UTILITIES ON LANDSCAPE PLANS AS IT | | | APPEARS THERE ARE CONFLICTS. | | | 5. CCTV MAY NEED BE TO EASTERLY MANHOLE AT POINT OF | | | ROAD CURVATURE. UTILITIES TO CONFIRM AFTER REVIEW. | | | | | | ADDITIONAL COMMENTS FROM SUZANNE BERGLUND, ENGINEERING | | | MANAGER: | | | | | | ADDRESS NOW: | | | 1) PROVIDE WRITTEN APPROVAL FROM PARKS AND RECREATION | | | ON THE LOCATION OF THE PROPOSED RESTROOM FACILITY. | | | 2) RELOCATE THE METER SERVICING THE RESTROOM FACILITY | | | OUTSIDE OF THE LEASE BOUNDARY. | | | 3) THE CITY WILL NOT ASSUME RESPONSIBILITY OF THE | | | MAINTENANCE OF THE SAND/OIL SEPARATOR. CONFIRM THIS | | | WILL BE MAINTAINED BY THE SCIENCE CENTER. | | | 4) SHOW WHAT THE EXISTING WATER METERS ARE SERVING AND | | | WHERE THE EXISTING WATER METERS SHOWN ON THE PLANS TIE | | | INTO THE EXISTING WATER MAIN. | | | 5) PROVIDE FFE OF THE PROPOSED RESTROOM FACILITY AND | | | CONFIRM WHAT RAMPS WOULD BE NEEDED FOR ADA ACCESS TO | | | PROPOSED RESTROOM FACILITY. THE DESIGN OF THE RAMP AS | | | SHOWN WILL NOT BE ACCEPTABLE. | | | | | | ADDRESS PRIOR TO ENGINEERING PERMIT | | | 6) PLEASE COORDINATE WITH DON GUSTAFSON, | | | [email protected] ON SPECIFICATIONS FOR THE RESTROOM | | | PAD AND FINAL LOCATIONS OF THE POINT OF SERVICE TO THE | | | PROPOSED RESTROOM FACILITY | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
3 |
Status |
P |
Date |
03-31-2023 |
|
|
Cont ID |
|
| Sent By |
|
Date |
03-31-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
03-31-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-03-31 17:25:50 | TRAFFIC COMMENTS | | | 1) SATISFIED. PROVIDE AN UPDATED TRAFFIC STUDY, AS IT | | | IS BASED ON OLD TRAFFIC COUNTS, ASSUMPTIONS AND | | | METHODOLOGIES. PLEASE PERFORM A NEW SET OF TRAFFIC | | | COUNTS, AND PROVIDE A DETAILED ELABORATION ON THE TRIP | | | GENERATION CALCULATION | | | 2) SATISFIED. INCLUDE THE INTERSECTIONS OF DREHER TRAIL | | | N WITH SUMMIT AND SOUTHERN BLVD IN THE ANALYSIS | | | 3) SATISFIED. PROVIDE AN UPDATED PARKING STUDY. ACTUAL | | | DATA SHOULD BE COLLECTED IN ORDER TO CORROBORATE THE | | | THEORETICAL FORMULAS. TYPICAL DAILY/WEEKEND USAGE AND | | | AT LEAST ONE SPECIAL EVENT SHOULD BE ACCOUNTED FOR | | | 4) SATISFIED. BOTH THE TRAFFIC IMPACT STATEMENT AND | | | PARKING DEMAND STUDY NEED TO CONSIDER THE MULTI-PHASE | | | APPROACH OF THE PROPOSED DEVELOPMENT AND PROVIDE | | | NARRATIVE EXPLAINING AND ILLUSTRATING TRAFFIC IMPACTS, | | | CIRCULATION, PARKING AND MITIGATION MEASUREMENTS FOR | | | EACH PHASE | | | 5) WAVED BY ADMIN. PROVIDE A CRASH ANALYSIS ALONG THE | | | MAIN ACCESS DRIVEWAYS AND IDENTIFY MITIGATION | | | MEASUREMENTS. THE S4 DATABASE SHOWED 4 INCIDENTS IN THE | | | PAST 2 YEARS. CITY WAS ALSO CONTACTED IN 2020 | | | PERTAINING IMPROVEMENTS BY THE SHARP TURN ALONG N | | | DREHER TRAIL JUST WEST OF THE SCIENCE CENTER. PLEASE | | | PROVIDE AN ELABORATION PARAGRAPH PERTAINING THE | | | RESULTS, AND RECOMMEND MITIGATION MEASURES, IF NEEDED | | | OR IDENTIFIED | | | 6) SATISFIED. PROVIDE COUNTY TPS LETTER | | | 7) WAVED BY ADMIN. DEPENDING ON THE OUTCOME OF THE | | | TRAFFIC ANALYSIS, TRANSPORTATION DEMAND MANAGEMENT | | | (TDM) MEASURES MAY BE ENCOURAGED. ACKNOWLEDGEMENT IS | | | NOT A SUFFICIENT ANSWER. | | | SITE COMMENTS | | | 8) WAVED BY ADMIN. PROVIDE A TRANSPORTATION SPECIFIC | | | SITE PLAN FOR THE GROUND FLOOR. SHOWCASING | | | TRANSPORTATION RELATED FEATURES (E.G. ROADWAY WIDTHS, | | | DRIVING AISLES, PARKING STALLS, SIDEWALK, CURB, GUTTER, | | | DRIVEWAY, GATES, CROSSWALKS, VISIBILITY TRIANGLE, | | | CORNER & DRIVEWAY SEPARATION DISTANCES, SLOPES, ETC.) | | | PROPERLY LABELED AND DIMENSIONED. THE SITE PLAN SHOULD | | | BE NAMED T-1.0. SEVERAL DIMENSIONS ARE MISSING IN THE | | | LATEST RESUBMISSION, PLEASE REVISE AND VERIFY THAT | | | DRIVE AISLES AND PARKING STALLS ARE COMPLIANT WITH CITY | | | CODE MINIMUM WIDTH/LENGTH REQUIREMENTS | | | 9) SATISFIED. IN THE T-1.0 SITE PLAN, PLEASE SHOWCASE | | | BASIC CURB DETAILS (E.G. DRIVEWAY, CURB CUTS, PAVEMENT | | | MARKINGS, PARKING STALLS, ETC.) ON THE OPPOSITE SIDE OF | | | THE ROADS SURROUNDING THE PROPOSED DEVELOPMENT | | | 10) SATISFIED. PROVIDE A SIGNAGE AND PAVEMENT MARKING | | | PLAN. INCLUSIVE OF ALL FEATURES WITHIN THE PROPOSED | | | DEVELOPMENT AND ALONG ALL ROADS FRONTING THE SITE. SUCH | | | PLAN IS PART OF THE TRANSPORTATION REVIEW AND SHOULD BE | | | NAMED ACCORDINGLY (E.G. T-1.1 OR T-2.0) | | | 11) SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE | | | TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND OUT OF THE | | | PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES AND | | | WHEEL PATHS CLEARLY DISTINCT AND DEFINED IN DIFFERENT | | | COLORS. PROVIDE THE ANALYSIS IN A SEPARATE SHEET. SUCH | | | PLAN(S) CONTAINING THE ANALYSIS ARE PART OF THE | | | TRANSPORTATION REVIEW AND SHOULD BE NAMED ACCORDINGLY | | | (E.G. T1.2, T-3.0) | | | 12) SATISFIED. PROVIDE A PARKING TABLE SHOWCASING THE | | | NUMBER OF REQUIRED AND PROVIDED PARKING SPACES, | | | INCLUSIVE OF ADA AND BICYCLE ONES | | | 13) SATISFIED. IN THE PAVEMENT, MARKING & SIGN PLAN, | | | PROVIDE A TABLE SHOWCASING THE NUMBER OF EXISTING AND | | | PROPOSED ON-STREET PARKING STALLS. PROVIDE THE NUMBER | | | OF METERED STALLS THAT ARE BEING REMOVED OR RELOCATED, | | | IF ANY | | | 14) WAVED BY ADMIN. ARE THERE ANY GATES PROPOSED? IF | | | SO, CLEARLY SHOWCASE THE REQUIRED 20 FEET SETBACK | | | DISTANCE FROM THE BACK OF THE SIDEWALK. IN CASE A | | | SIDEWALK IS MISSING, PLEASE SHOWCASE THE SETBACK | | | DISTANCE FROM THE EDGE OF THE TRAVEL LANE. PLEASE | | | PROVIDE SHEET/DOCUMENT NUMBER SHOWCASING SUCH ITEM | | | 15) SATISFIED. IS VALET SERVICE PROPOSED? IF SO, | | | PROVIDE A THOROUGH OPERATIONAL ANALYSIS. DETAILS OF THE | | | ANALYSIS SHOULD BE DISCUSSED DURING THE METHODOLOGY | | | MEETING | | | 16) SATISFIED. ARE THERE ANY BUS STOPS BEING IMPACTED? | | | 17) SATISFIED. IS THE PROPOSED DEVELOPMENT IMPACTING AN | | | EXISTING BICYCLE FACILITY? | | | 18) TO BE SATISFIED AT BUILDING PERMIT. PROVIDE A | | | CONSTRUCTION MANAGEMENT PLAN. PLEASE REFER TO CITY CODE | | | 86-246 FOR DETAILS. | | | | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
2 |
Status |
F |
Date |
03-14-2023 |
|
|
Cont ID |
|
| Sent By |
|
Date |
03-14-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
03-14-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-03-14 10:52:12 | TRAFFIC COMMENTS | | | 1) SATISFIED. PROVIDE AN UPDATED TRAFFIC STUDY, AS IT | | | IS BASED ON OLD TRAFFIC COUNTS, ASSUMPTIONS AND | | | METHODOLOGIES. PLEASE PERFORM A NEW SET OF TRAFFIC | | | COUNTS, AND PROVIDE A DETAILED ELABORATION ON THE TRIP | | | GENERATION CALCULATION | | | 2) SATISFIED. INCLUDE THE INTERSECTIONS OF DREHER TRAIL | | | N WITH SUMMIT AND SOUTHERN BLVD IN THE ANALYSIS | | | 3) SATISFIED. PROVIDE AN UPDATED PARKING STUDY. ACTUAL | | | DATA SHOULD BE COLLECTED IN ORDER TO CORROBORATE THE | | | THEORETICAL FORMULAS. TYPICAL DAILY/WEEKEND USAGE AND | | | AT LEAST ONE SPECIAL EVENT SHOULD BE ACCOUNTED FOR | | | 4) SATISFIED. BOTH THE TRAFFIC IMPACT STATEMENT AND | | | PARKING DEMAND STUDY NEED TO CONSIDER THE MULTI-PHASE | | | APPROACH OF THE PROPOSED DEVELOPMENT AND PROVIDE | | | NARRATIVE EXPLAINING AND ILLUSTRATING TRAFFIC IMPACTS, | | | CIRCULATION, PARKING AND MITIGATION MEASUREMENTS FOR | | | EACH PHASE | | | 5) PARTIALLY SATISFIED. PROVIDE A CRASH ANALYSIS ALONG | | | THE MAIN ACCESS DRIVEWAYS AND IDENTIFY MITIGATION | | | MEASUREMENTS. THE S4 DATABASE SHOWED 4 INCIDENTS IN THE | | | PAST 2 YEARS. CITY WAS ALSO CONTACTED IN 2020 | | | PERTAINING IMPROVEMENTS BY THE SHARP TURN ALONG N | | | DREHER TRAIL JUST WEST OF THE SCIENCE CENTER. PLEASE | | | PROVIDE AN ELABORATION PARAGRAPH PERTAINING THE | | | RESULTS, AND RECOMMEND MITIGATION MEASURES, IF NEEDED | | | OR IDENTIFIED | | | 6) SATISFIED. PROVIDE COUNTY TPS LETTER | | | 7) PARTIALLY SATISFIED. DEPENDING ON THE OUTCOME OF THE | | | TRAFFIC ANALYSIS, TRANSPORTATION DEMAND MANAGEMENT | | | (TDM) MEASURES MAY BE ENCOURAGED. ACKNOWLEDGEMENT IS | | | NOT A SUFFICIENT ANSWER. | | | SITE COMMENTS | | | 8) PARTIALLY SATISFIED. PROVIDE A TRANSPORTATION | | | SPECIFIC SITE PLAN FOR THE GROUND FLOOR. SHOWCASING | | | TRANSPORTATION RELATED FEATURES (E.G. ROADWAY WIDTHS, | | | DRIVING AISLES, PARKING STALLS, SIDEWALK, CURB, GUTTER, | | | DRIVEWAY, GATES, CROSSWALKS, VISIBILITY TRIANGLE, | | | CORNER & DRIVEWAY SEPARATION DISTANCES, SLOPES, ETC.) | | | PROPERLY LABELED AND DIMENSIONED. THE SITE PLAN SHOULD | | | BE NAMED T-1.0. SEVERAL DIMENSIONS ARE MISSING IN THE | | | LATEST RESUBMISSION, PLEASE REVISE AND VERIFY THAT | | | DRIVE AISLES AND PARKING STALLS ARE COMPLIANT WITH CITY | | | CODE MINIMUM WIDTH/LENGTH REQUIREMENTS | | | 9) SATISFIED. IN THE T-1.0 SITE PLAN, PLEASE SHOWCASE | | | BASIC CURB DETAILS (E.G. DRIVEWAY, CURB CUTS, PAVEMENT | | | MARKINGS, PARKING STALLS, ETC.) ON THE OPPOSITE SIDE OF | | | THE ROADS SURROUNDING THE PROPOSED DEVELOPMENT | | | 10) SATISFIED. PROVIDE A SIGNAGE AND PAVEMENT MARKING | | | PLAN. INCLUSIVE OF ALL FEATURES WITHIN THE PROPOSED | | | DEVELOPMENT AND ALONG ALL ROADS FRONTING THE SITE. SUCH | | | PLAN IS PART OF THE TRANSPORTATION REVIEW AND SHOULD BE | | | NAMED ACCORDINGLY (E.G. T-1.1 OR T-2.0) | | | 11) SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE | | | TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND OUT OF THE | | | PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES AND | | | WHEEL PATHS CLEARLY DISTINCT AND DEFINED IN DIFFERENT | | | COLORS. PROVIDE THE ANALYSIS IN A SEPARATE SHEET. SUCH | | | PLAN(S) CONTAINING THE ANALYSIS ARE PART OF THE | | | TRANSPORTATION REVIEW AND SHOULD BE NAMED ACCORDINGLY | | | (E.G. T1.2, T-3.0) | | | 12) SATISFIED. PROVIDE A PARKING TABLE SHOWCASING THE | | | NUMBER OF REQUIRED AND PROVIDED PARKING SPACES, | | | INCLUSIVE OF ADA AND BICYCLE ONES | | | 13) SATISFIED. IN THE PAVEMENT, MARKING & SIGN PLAN, | | | PROVIDE A TABLE SHOWCASING THE NUMBER OF EXISTING AND | | | PROPOSED ON-STREET PARKING STALLS. PROVIDE THE NUMBER | | | OF METERED STALLS THAT ARE BEING REMOVED OR RELOCATED, | | | IF ANY | | | 14) PARTIALLY SATISFIED. ARE THERE ANY GATES PROPOSED? | | | IF SO, CLEARLY SHOWCASE THE REQUIRED 20 FEET SETBACK | | | DISTANCE FROM THE BACK OF THE SIDEWALK. IN CASE A | | | SIDEWALK IS MISSING, PLEASE SHOWCASE THE SETBACK | | | DISTANCE FROM THE EDGE OF THE TRAVEL LANE. PLEASE | | | PROVIDE SHEET/DOCUMENT NUMBER SHOWCASING SUCH ITEM | | | 15) SATISFIED. IS VALET SERVICE PROPOSED? IF SO, | | | PROVIDE A THOROUGH OPERATIONAL ANALYSIS. DETAILS OF THE | | | ANALYSIS SHOULD BE DISCUSSED DURING THE METHODOLOGY | | | MEETING | | | 16) SATISFIED. ARE THERE ANY BUS STOPS BEING IMPACTED? | | | 17) SATISFIED. IS THE PROPOSED DEVELOPMENT IMPACTING AN | | | EXISTING BICYCLE FACILITY? | | | 18) TO BE SATISFIED AT BUILDING PERMIT. PROVIDE A | | | CONSTRUCTION MANAGEMENT PLAN. PLEASE REFER TO CITY CODE | | | 86-246 FOR DETAILS. | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
12-16-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
12-16-2022 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
12-16-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-12-16 18:08:30 | TRAFFIC COMMENTS | | | 1) PROVIDE AN UPDATED TRAFFIC STUDY, AS IT IS BASED ON | | | OLD TRAFFIC COUNTS, ASSUMPTIONS AND METHODOLOGIES. | | | PLEASE PERFORM A NEW SET OF TRAFFIC COUNTS, AND PROVIDE | | | A DETAILED ELABORATION ON THE TRIP GENERATION | | | CALCULATION | | | 2) INCLUDE THE INTERSECTIONS OF DREHER TRAIL N WITH | | | SUMMIT AND SOUTHERN BLVD IN THE ANALYSIS | | | 3) PROVIDE AN UPDATED PARKING STUDY. ACTUAL DATA SHOULD | | | BE COLLECTED IN ORDER TO CORROBORATE THE THEORETICAL | | | FORMULAS. TYPICAL DAILY/WEEKEND USAGE AND AT LEAST ONE | | | SPECIAL EVENT SHOULD BE ACCOUNTED FOR | | | 4) BOTH THE TRAFFIC IMPACT STATEMENT AND PARKING DEMAND | | | STUDY NEED TO CONSIDER THE MULTI-PHASE APPROACH OF THE | | | PROPOSED DEVELOPMENT AND PROVIDE NARRATIVE EXPLAINING | | | AND ILLUSTRATING TRAFFIC IMPACTS, CIRCULATION, PARKING | | | AND MITIGATION MEASUREMENTS FOR EACH PHASE | | | 5) PROVIDE A CRASH ANALYSIS ALONG THE MAIN ACCESS | | | DRIVEWAYS AND IDENTIFY MITIGATION MEASUREMENTS. THE S4 | | | DATABASE SHOWED 4 INCIDENTS IN THE PAST 2 YEARS. CITY | | | WAS ALSO CONTACTED IN 2020 PERTAINING IMPROVEMENTS BY | | | THE SHARP TURN ALONG N DREHER TRAIL JUST WEST OF THE | | | SCIENCE CENTER | | | 6) PROVIDE COUNTY TPS LETTER | | | 7) DEPENDING ON THE OUTCOME OF THE TRAFFIC ANALYSIS, | | | TRANSPORTATION DEMAND MANAGEMENT (TDM) MEASURES MAY BE | | | ENCOURAGED | | | | | | SITE COMMENTS | | | 8) PROVIDE A TRANSPORTATION SPECIFIC SITE PLAN FOR THE | | | GROUND FLOOR. SHOWCASING TRANSPORTATION RELATED | | | FEATURES (E.G. ROADWAY WIDTHS, DRIVING AISLES, PARKING | | | STALLS, SIDEWALK, CURB, GUTTER, DRIVEWAY, GATES, | | | CROSSWALKS, VISIBILITY TRIANGLE, CORNER & DRIVEWAY | | | SEPARATION DISTANCES, SLOPES, ETC.) PROPERLY LABELED | | | AND DIMENSIONED. THE SITE PLAN SHOULD BE NAMED T-1.0 | | | 9) IN THE T-1.0 SITE PLAN, PLEASE SHOWCASE BASIC CURB | | | DETAILS (E.G. DRIVEWAY, CURB CUTS, PAVEMENT MARKINGS, | | | PARKING STALLS, ETC.) ON THE OPPOSITE SIDE OF THE ROADS | | | SURROUNDING THE PROPOSED DEVELOPMENT | | | 10) PROVIDE A SIGNAGE AND PAVEMENT MARKING PLAN. | | | INCLUSIVE OF ALL FEATURES WITHIN THE PROPOSED | | | DEVELOPMENT AND ALONG ALL ROADS FRONTING THE SITE. SUCH | | | PLAN IS PART OF THE TRANSPORTATION REVIEW AND SHOULD BE | | | NAMED ACCORDINGLY (E.G. T-1.1 OR T-2.0) | | | 11) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND/OR | | | SERVICE VEHICLES DRIVING IN AND OUT OF THE PROPOSED | | | DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES AND WHEEL | | | PATHS CLEARLY DISTINCT AND DEFINED IN DIFFERENT COLORS. | | | PROVIDE THE ANALYSIS IN A SEPARATE SHEET. SUCH PLAN(S) | | | CONTAINING THE ANALYSIS ARE PART OF THE TRANSPORTATION | | | REVIEW AND SHOULD BE NAMED ACCORDINGLY (E.G. T1.2, | | | T-3.0) | | | 12) PROVIDE A PARKING TABLE SHOWCASING THE NUMBER OF | | | REQUIRED AND PROVIDED PARKING SPACES, INCLUSIVE OF ADA | | | AND BICYCLE ONES | | | 13) IN THE PAVEMENT, MARKING & SIGN PLAN, PROVIDE A | | | TABLE SHOWCASING THE NUMBER OF EXISTING AND PROPOSED | | | ON-STREET PARKING STALLS. PROVIDE THE NUMBER OF METERED | | | STALLS THAT ARE BEING REMOVED OR RELOCATED, IF ANY | | | 14) ARE THERE ANY GATES PROPOSED? IF SO, CLEARLY | | | SHOWCASE THE REQUIRED 20 FEET SETBACK DISTANCE FROM THE | | | BACK OF THE SIDEWALK | | | 15) IS VALET SERVICE PROPOSED? IF SO, PROVIDE A | | | THOROUGH OPERATIONAL ANALYSIS. DETAILS OF THE ANALYSIS | | | SHOULD BE DISCUSSED DURING THE METHODOLOGY MEETING | | | 16) ARE THERE ANY BUS STOPS BEING IMPACTED? | | | 17) IS THE PROPOSED DEVELOPMENT IMPACTING AN EXISTING | | | BICYCLE FACILITY? | | | 18) PROVIDE A CONSTRUCTION MANAGEMENT PLAN. PLEASE | | | REFER TO CITY CODE 86-246 FOR DETAILS. | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
03-14-2023 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
03-14-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
03-14-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-03-14 16:57:13 | PLANS AND PLATS REVIEW COMMITTEE (PPRC) ZONING REVIEW | | | ________________________________________ | | | | | | DATE OF REVIEW: 03.14.2023 | | | ________________________________________ | | | | | | PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING | | | REVIEW COMMENTS: | | | | | | 1. SATISFIED - AN APPROVED TRAFFIC PERFORMANCE | | | STANDARDS LETTER SHALL BE PROVIDED FROM THE PALM BEACH | | | COUNTY ENGINEERING DEPARTMENT - TRAFFIC DIVISION. | | | | | | 2. PARTIALLY SATISFIED- OUTSTANDING PUBLIC UTILITY | | | LETTERS SHALL BE PROVIDED. A LETTER FROM FPU IS STILL | | | MISSING. THIS CAN BE CONDITIONED PRIOR TO CITY | | | COMMISSION; HOWEVER, THE LETTER MUST BE PROVIDED AS | | | SOON AS POSSIBLE | | | | | | 3. SATISFIED (THIS REVIEW/DISCUSSION WILL CONTINUE AS | | | THE PROJECT MOVES INTO PERMITTING) - SIGNIFICANT | | | DISCUSSIONS WILL NEED TO CONTINUE THROUGHOUT THE SITE | | | PLAN REVIEW/PERMITTING PROCESS REGARDING THE PHASING. | | | ADDITIONAL EXHIBITS AND DATA TABLES WILL LIKELY NEED TO | | | BE PROVIDED. WILL NEED TO DEMONSTRATE THAT SUFFICIENT | | | PARKING, ACCESS, ETC. WILL BE MAINTAINED THROUGHOUT | | | CONSTRUCTION. | | | | | | 4. SATISFIED - THE JUSTIFICATION STATEMENT INDICATES | | | THAT THERE ARE 76 SPACES PROPOSED TO BE CONSTRUCTED | | | OUTSIDE OF THE LEASE AREA, AND ARE A PART OF THE WAIVER | | | REQUEST; THE SITE PLAN SHOWS 78 SPACES. | | | | | | 5. SATISFIED (BEING ADDRESSED AS PART OF LEASE | | | PROVISIONS) - DISCUSSIONS WILL NEED TO CONTINUE | | | REGARDING THE LIMITS OF THE MAINTENANCE OBLIGATIONS. | | | ADDITIONAL EXHIBITS WILL LIKELY NEED TO BE PROVIDED. | | | | | | 6. SATISFIED (SUBJECT TO MAINTENACE OF NORTH PARKING BY | | | THE SCIENCE CENTER) - IS IT POSSIBLE TO MAKE THE LEASE | | | LINE SUCH THAT IT DOES NOT SPLIT THE ACCESSIBLE PARKING | | | SPACE? IF THE PARKING OUTSIDE OF THE LEASE AREA WILL BE | | | THE MAINTENANCE OBLIGATION OF THE SCIENCE CENTER, | | | IT???S NOT SO MUCH OF AN ISSUE. | | | | | | 7. SATISFIED - PLEASE CLARIFY THE PARKING WAIVER ??? | | | THERE IS NO REQUEST TO REDUCE THE NUMBER OF REQUIRED | | | SPACES, BUT SIMPLY TO ALLOW THE SPACES TO BE LOCATED | | | OUTSIDE OF THE LEASE AREA. | | | | | | 8. SATISFIED - THERE ARE MULTIPLE LOCATIONS WHERE | | | TREES, GATES, ETC. ARE PROPOSED TO BE LOCATED WITHIN AN | | | EASEMENT. EITHER THE TREES SHALL BE RELOCATED TO POINTS | | | OUTSIDE THE EASEMENT, OR CONSENT SHALL BE OBTAINED FROM | | | THE EASEMENT HOLDER. | | | | | | 8.1. SATISFIED - THERE ARE STILL LOCATIONS WHERE TREES | | | ARE BEING SHOWN IN AN EASEMENT. | | | | | | 9. SATISFIED - ON THE SITE PLAN THERE IS A SYMBOL OF W2 | | | ALONG THE EAST LEASE LINE ??? I BELIEVE THIS SHOULD BE | | | W3 TO CORRESPOND WITH THE LANDSCAPE BUFFER WAIVER. | | | | | | 10. SATISFIED - ON THE SITE PLAN THERE IS A SYMBOL OF | | | W3 ALONG THE WEST LEASE LINE ??? NO WAIVER IS BEING | | | REQUESTED ALONG THIS PROPERTY LINE, CORRECT? THIS SEEMS | | | CONFUSING. THE SYMBOLS FOR THE WAIVERS SHOULD BE | | | LOCATED IN THE AREAS IN WHICH THE WAIVER IS PROPOSED TO | | | OCCUR (IF SPECIFIC TO A LOCATION). | | | | | | 10.1. SATISFIED - THERE IS A SYMBOL OF W4 ALONG THE | | | WEST PROPERTY LINE. IN THE JUSTIFICATION STATEMENT THIS | | | INDICATES A WAIVER FROM FENCE HEIGHT REQUIREMENTS, BUT | | | THIS IS NOT CONTAINED IN THE WAIVER TABLE ON THE SITE | | | PLAN. | | | | | | 11. SATISFIED - IS THE DIESEL TANK PROPOSED TO BE ABOVE | | | OR BELOW GROUND? IF ABOVE GROUND, AN OPAQUE ENCLOSURE | | | AND HEDGING SHALL BE PROVIDED ??? PLEASE PROVIDE | | | DETAILS. | | | | | | 11.1. SATISFIED - THE ENCLOSURE AROUND THE DIESEL TANK | | | AND BRANCH PICK-UP AREA ENCROACHES INTO AN EASEMENT. | | | EASEMENT CONSENT SHALL BE OBTAINED FROM THE EASEMENT | | | HOLDER. ADDITIONALLY, THE WALL IS WITHIN THE "FRONT" | | | SETBACK AND WOULD NEED TO BE INCLUDED IN THE WAIVER | | | REQUEST AS IT IS MORE THAN FOUR (4) FEET IN HEIGHT. | | | | | | 11.2. SATISFIED- THE ENCLOSURE AROUND THE DIESEL TANK | | | AND BRANCH PICK-UP AREA DOES NOT HAVE THE REQUIRED | | | LANDSCAPE MATERIAL SURROUNDING IT. | | | | | | 12. PARTIALLY SATISFIED - DETAILS SHALL BE PROVIDED FOR | | | THE GENERATOR ENCLOSURE, AS WELL AS ENCLOSURE OF THE | | | AQUARIUM EQUIPMENT, ETC. ADDITIONAL DISCUSSION MAY NEED | | | TO OCCUR ON THE HOW EQUIPMENT/SERVICE AREAS ARE BEING | | | SCREENED AND WHAT DETAILS NEED TO BE PROVIDED. | | | | | | 12.1. SATISFIED - THE ENCLOSURE AROUND THE GENERATORS | | | DOES NOT HAVE THE REQUIRED LANDSCAPE MATERIAL | | | SURROUNDING IT. | | | | | | 12.2. SATISFIED - THE ENCLOSURE AROUND THE GENERATORS | | | SHALL BE OPAQUE AND THE GENERATOR SHALL NOT BE VISIBLE. | | | | | | 12.3. PARTIALLY SATISFIED - HOW IS THE AQUARIUM | | | EQUIPMENT YARD PROPOSED TO BE SCREENED/LANDSCAPED? THE | | | CHAINLINK FENCE SHALL BE REPLACED WITH AN OPAQUE FENCE | | | AND LANDSCAPING. | | | | | | 12.4. SATISFIED - DETAIL #5 ON SHEET AS-203 IS LABELED | | | AS THE ELEVATION FOR THE DIESEL TANK STORAGE, HOWEVER | | | THIS APPEARS TO BE FOR THE LOADING/SERVICE AREA. | | | | | | 12.5. SATISFIED - IN THE SERVICE AREA SURROUNDING | | | BUILDING 2A, THERE APPEARS TO BE REMNANTS OF FENCING | | | STILL BEING SHOWN, IN ADDITION TO THE PROPOSED WALL. | | | PLEASE CLARIFY. | | | | | | 13. SATISFIED - WHAT IS THE BUILDING SEPARATION BETWEEN | | | BUILDING 1 AND BUILDING 2? IS THIS A PART OF THE WAIVER | | | REQUEST? | | | | | | 14. SATISFIED - WOULD IT BE PREFERRED TO REMOVE FROM | | | THE SITE/LANDSCAPE PLANS ANY EASEMENTS THAT HAVE | | | ALREADY BEEN ABANDONED? | | | | | | 14.1. SATISFIED - THERE APPEAR TO BE LABELS FOR | | | ABANDONED EASEMENTS THAT STILL EXIST ON THE LANDSCAPE | | | PLANS. | | | | | | 15. SATISFIED - THERE IS DETAIL LACKING ON THE SITE | | | PLAN, SPECIFICALLY REGARDING THOSE AREAS IN FRONT OF | | | THE PROPOSED EXPANSION. GATES ARE SHOWN, BUT THERE IS | | | NOT INFORMATION AS TO WHETHER THESE GATES TIE INTO | | | PROPOSED FENCING OR WALLS, WHAT THE FENCING/WALLS (IF | | | APPLICABLE) ARE PROPOSED TO CONSIST OF, ETC. | | | | | | 15.1. SATISFIED - THE ARCHITECTURAL SITE PLAN INDICATES | | | A SECURITY GATE, FENCING, ETC. ALONG THE SOUTH LEASE | | | BOUNDARY; THIS IS NOT SHOWN ON THE SITE PLAN AND WOULD | | | NEED TO BE A PART OF THE WAIVER #4 REQUEST AS A PORTION | | | OF IT IS LOCATED WITHIN THE "FRONT" SETBACK. | | | | | | 16. SATISFIED ??? SHOULDN???T BUILDING 4 BE SHADED AS A | | | ???PROPOSED BUILDING???? IS THIS BUILDING ACCOUNTED FOR | | | IN SQUARE FOOTAGES, ETC.? | | | | | | 17. SATISFIED - PLEASE CLARIFY WHAT IS BEING IDENTIFIED | | | AS THE FRONT, SIDE, REAR, ETC. AS THE PROPOSED SETBACKS | | | INDICATED IN THE SITE DATA TABLE DO NOT SEEM TO | | | CORRESPOND WITH THE SETBACKS SHOWN ON THE SITE PLAN. | | | | | | 18. PARTIALLY SATISFIED - FENCES, GATES, ETC. LOCATED | | | WITHIN THE FRONT SETBACK ARE NOT TO EXCEED FOUR (4) | | | FEET IN HEIGHT. A WAIVER IS REQUESTED. | | | | | | 18.1. PARTIALLY SATISFIED - SEE COMMENTS #11.1. AND | | | #15.1. REGARDING ADDITIONAL LOCATIONS THAT NEED TO BE | | | IDENTIFIED FOR THE WAIVER REQUEST. | | | | | | 19. SATISFIED - THE BIKE RACK AT BUILDING 5 IS ORIENTED | | | IN SUCH A WAY THAT BOTH SPACES CANNOT BE ACCESSED. | | | | | | 20. SATISFIED - IN ADDITION TO THE HEIGHT OF THE | | | BUILDING AT THE ROOF DECK, PLEASE PROVIDE THE HEIGHT OF | | | THE BUILDING AS MEASURED TO THE TOP OF THE PARAPET. | | | | | | 20.1. SATISFIED - THE HEIGHT TO THE TOP OF THE PARAPET | | | WAS PROVIDED IN THE "RESPONSE TO COMMENTS" BUT DOES NOT | | | APPEAR TO BE SHOWN ON THE PLANS. | | | | | | 21. SATISFIED - THE LANDSCAPE AREA PROPOSED, PLUS THE | | | IMPERVIOUS SURFACE AREA PROPOSED, SHOULD ADD UP TO | | | 100%. ACCORDING TO THE PROPERTY DEVELOPMENT | | | REQUIREMENTS TABLE, THE TOTAL IS ONLY 93%. | | | | | | 22. SATISFIED - EXPLANATION IS NEEDED REGARDING THE | | | SECURITY GATE AT THE NORTH END OF THE FPL SUBSTATION. | | | HOW WILL FPL MAINTAIN ACCESS FOR MAINTENANCE PURPOSES? | | | WHEN IS THE GATE OPEN/CLOSED? WILL PATRONS OF THE | | | SCIENCE CENTER BE PRESENT WHEN THIS GATE IS CLOSED AND | | | IF SO, WILL A TURNAROUND NEED TO BE PROVIDED? | | | | | | 23. SATISFIED - THE ARCHITECTURAL SITE PLAN REFERENCES | | | A COVERED WALKWAY BETWEEN THE BUILDINGS. THIS IS NOT | | | SHOWN ON THE SITE PLAN AND THERE IS NOT ENOUGH | | | INFORMATION/DETAIL TO UNDERSTAND WHAT IS PROPOSED. WHAT | | | IS THIS COVERING TO CONSIST OF? WHAT ARE THE LIMITS OF | | | THE COVERING? IS THE COVERING CONNECTED TO EACH OF THE | | | BUILDINGS? IF SO, THEN ALL OF THE CONNECTED BUILDINGS | | | COULD POTENTIALLY BE CLASSIFIED AS ONE BUILDING (FROM A | | | ZONING PERSPECTIVE). MORE INFORMATION IS NEEDED. | | | | | | 26. SATISFIED - THE GRAPHIC SCALE ON THE ARCHITECTURAL | | | SITE PLAN IS INCORRECT. | | | | | | 27. SATISFIED - THE ARCHITECTURAL SITE PLAN DOES NOT | | | MATCH THE SITE PLAN. SPECIFIC AREAS INCLUDE: | | | - CHILLER ENCLOSURE IS STILL LABELED AS BUILDING #4 | | | - BUILDING #4 ON THE SITE PLAN IS LABELED AS BUILDING | | | #5 ON THE ARCHITECTURAL SITE PLAN. | | | - THE BIKE RACK SOUTH OF BUILDING #4 (AS LABELED ON THE | | | SITE PLAN) IS IN A DIFFERENT LOCATION. | | | - THE SIDEWALK NEAR THE ACCESSIBLE PARKING SOUTH OF | | | BUILDING #4 (AS LABELED ON THE SITE PLAN) IS DIFFERENT. | | | ________________________________________ | | | | | | PLEASE NOTE THE FOLLOWING WHEN RESUBMITTING: | | | | | | A) WRITTEN RESPONSES TO COMMENTS MADE BY ALL | | | DEPARTMENTS SHALL BE PROVIDED UPON RESUBMISSION. | | | | | | B) ELECTRONIC COPIES OF ALL REVISED PLANS AND/OR | | | DOCUMENTS SHALL BE PROVIDED. | | | | | | C) PLEASE NOTE THAT RE-SUBMITTALS MAY BE SUBJECT TO | | | ADDITIONAL COMMENTS. | | | | | | D) IF NO RESPONSE IS RECEIVED WITHIN 60 DAYS OF THE | | | ISSUANCE OF THESE COMMENTS, THE APPLICATION WILL BE | | | CONSIDERED WITHDRAWN AND ANY FURTHER ACTION WILL | | | REQUIRE SUBMISSION OF A NEW DEVELOPMENT APPLICATION. | | | | | | E) PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20% OF THE ORIGINAL APPLICATION FEE. | | | | | | F) IN ORDER TO BE CONSIDERED FOR THE FEBRUARY 22, 2023, | | | PLANNING BOARD AGENDA, ALL COMMENTS SHALL BE | | | SATISFACTORILY ADDRESSED. PLEASE SUBMIT ALL REVISED | | | DOCUMENTS/PLANS NO LATER THAN FRIDAY, DECEMBER 23, | | | 2022. | | | | | | G) TO BE PLACED ON THE FEBRUARY 22, 2023, PLANNING | | | BOARD AGENDA, SIGNS SHALL BE POSTED ON THE PROPERTY NO | | | LATER THAN FEBRUARY 7, 2023. SIGNAGE SHALL CONFORM, AND | | | BE INSTALLED ACCORDING TO THE REQUIREMENTS OF THE | | | CITY???S ZONING AND LAND DEVELOPMENT REGULATIONS; SUCH | | | REQUIREMENTS ARE ALSO PROVIDED IN THE DEVELOPMENT | | | APPLICATION. A SIGNED AND NOTARIZED AFFIDAVIT SHALL BE | | | PROVIDED BY THE DEADLINE REFERENCED ABOVE. | | | | | | H) IF AFTER THE CASE HAS BEEN ADVERTISED THE APPLICANT | | | DESIRES TO REQUEST A CONTINUANCE, A FEE OF $50 PLUS THE | | | COST OF ADVERTISING WILL BE CHARGED. | | | ________________________________________ | | | | | | QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING: | | | | | | LINDA LOUIE, AICP, SENIOR PLANNER | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES DEPARTMENT ??? PLANNING DIVISION | | | 401 CLEMATIS STREET - P.O. BOX 3147 | | | WEST PALM BEACH, FLORIDA 33402 | | | | | | P: 561.822.1458 | | | TTY: 800.955.8771 | | | E: [email protected] | | | | | | W: WPB.ORG | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
01-31-2023 |
|
|
Cont ID |
|
| Sent By |
jroach |
Date |
01-31-2023 |
Time |
08:05 |
Rev Time |
0.00 |
| Received By |
jroach |
Date |
01-31-2023 |
Time |
08:05 |
Sent To |
|
|
| Notes |
| 2023-01-31 10:07:46 | PLANS AND PLATS REVIEW COMMITTEE (PPRC) ZONING REVIEW | | | ________________________________________ | | | | | | DATE OF REVIEW: 01.31.2023 | | | ________________________________________ | | | | | | PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING | | | REVIEW COMMENTS: | | | | | | 1. NOT SATISFIED - AN APPROVED TRAFFIC PERFORMANCE | | | STANDARDS LETTER SHALL BE PROVIDED FROM THE PALM BEACH | | | COUNTY ENGINEERING DEPARTMENT ??? TRAFFIC DIVISION. | | | | | | 2. NOT SATISFIED - OUTSTANDING PUBLIC UTILITY LETTERS | | | SHALL BE PROVIDED. | | | | | | 2.1. NEW COMMENT - COMCAST AND FPL LETTERS STILL | | | OUTSTANDING. | | | | | | 3. SATISFIED (THIS REVIEW/DISCUSSION WILL CONTINUE AS | | | THE PROJECT MOVES INTO PERMITTING) - SIGNIFICANT | | | DISCUSSIONS WILL NEED TO CONTINUE THROUGHOUT THE SITE | | | PLAN REVIEW/PERMITTING PROCESS REGARDING THE PHASING. | | | ADDITIONAL EXHIBITS AND DATA TABLES WILL LIKELY NEED TO | | | BE PROVIDED. WILL NEED TO DEMONSTRATE THAT SUFFICIENT | | | PARKING, ACCESS, ETC. WILL BE MAINTAINED THROUGHOUT | | | CONSTRUCTION. | | | | | | 4. SATISFIED - THE JUSTIFICATION STATEMENT INDICATES | | | THAT THERE ARE 76 SPACES PROPOSED TO BE CONSTRUCTED | | | OUTSIDE OF THE LEASE AREA, AND ARE A PART OF THE WAIVER | | | REQUEST; THE SITE PLAN SHOWS 78 SPACES. | | | | | | 5. SATISFIED (BEING ADDRESSED AS PART OF LEASE | | | PROVISIONS) - DISCUSSIONS WILL NEED TO CONTINUE | | | REGARDING THE LIMITS OF THE MAINTENANCE OBLIGATIONS. | | | ADDITIONAL EXHIBITS WILL LIKELY NEED TO BE PROVIDED. | | | | | | 6. SATISFIED (SUBJECT TO MAINTENACE OF NORTH PARKING BY | | | THE SCIENCE CENTER) - IS IT POSSIBLE TO MAKE THE LEASE | | | LINE SUCH THAT IT DOES NOT SPLIT THE ACCESSIBLE PARKING | | | SPACE? IF THE PARKING OUTSIDE OF THE LEASE AREA WILL BE | | | THE MAINTENANCE OBLIGATION OF THE SCIENCE CENTER, | | | IT???S NOT SO MUCH OF AN ISSUE. | | | | | | 7. SATISFIED - PLEASE CLARIFY THE PARKING WAIVER ??? | | | THERE IS NO REQUEST TO REDUCE THE NUMBER OF REQUIRED | | | SPACES, BUT SIMPLY TO ALLOW THE SPACES TO BE LOCATED | | | OUTSIDE OF THE LEASE AREA. | | | | | | 8. PARTIALLY SATISFIED - THERE ARE MULTIPLE LOCATIONS | | | WHERE TREES, GATES, ETC. ARE PROPOSED TO BE LOCATED | | | WITHIN AN EASEMENT. EITHER THE TREES SHALL BE RELOCATED | | | TO POINTS OUTSIDE THE EASEMENT, OR CONSENT SHALL BE | | | OBTAINED FROM THE EASEMENT HOLDER. | | | | | | 8.1. NEW COMMENT - THERE ARE STILL LOCATIONS WHERE | | | TREES ARE BEING SHOWN IN AN EASEMENT. | | | | | | 9. SATISFIED - ON THE SITE PLAN THERE IS A SYMBOL OF W2 | | | ALONG THE EAST LEASE LINE ??? I BELIEVE THIS SHOULD BE | | | W3 TO CORRESPOND WITH THE LANDSCAPE BUFFER WAIVER. | | | | | | 10. PARTIALLY SATISFIED - ON THE SITE PLAN THERE IS A | | | SYMBOL OF W3 ALONG THE WEST LEASE LINE ??? NO WAIVER IS | | | BEING REQUESTED ALONG THIS PROPERTY LINE, CORRECT? THIS | | | SEEMS CONFUSING. THE SYMBOLS FOR THE WAIVERS SHOULD BE | | | LOCATED IN THE AREAS IN WHICH THE WAIVER IS PROPOSED TO | | | OCCUR (IF SPECIFIC TO A LOCATION). | | | | | | 10.1. NEW COMMENT - THERE IS A SYMBOL OF W4 ALONG THE | | | WEST PROPERTY LINE. IN THE JUSTIFICATION STATEMENT THIS | | | INDICATES A WAIVER FROM FENCE HEIGHT REQUIREMENTS, BUT | | | THIS IS NOT CONTAINED IN THE WAIVER TABLE ON THE SITE | | | PLAN. | | | | | | 11. PARTIALLY SATISFIED - IS THE DIESEL TANK PROPOSED | | | TO BE ABOVE OR BELOW GROUND? IF ABOVE GROUND, AN OPAQUE | | | ENCLOSURE AND HEDGING SHALL BE PROVIDED ??? PLEASE | | | PROVIDE DETAILS. | | | | | | 11.1. NEW COMMENT - THE ENCLOSURE AROUND THE DIESEL | | | TANK AND BRANCH PICK-UP AREA ENCROACHES INTO AN | | | EASEMENT. EASEMENT CONSENT SHALL BE OBTAINED FROM THE | | | EASEMENT HOLDER. ADDITIONALLY, THE WALL IS WITHIN THE | | | "FRONT" SETBACK AND WOULD NEED TO BE INCLUDED IN THE | | | WAIVER REQUEST AS IT IS MORE THAN FOUR (4) FEET IN | | | HEIGHT. | | | | | | 11.2. NEW COMMENT - THE ENCLOSURE AROUND THE DIESEL | | | TANK AND BRANCH PICK-UP AREA DOES NOT HAVE THE REQUIRED | | | LANDSCAPE MATERIAL SURROUNDING IT. | | | | | | 12. PARTIALLY SATISFIED - DETAILS SHALL BE PROVIDED FOR | | | THE GENERATOR ENCLOSURE, AS WELL AS ENCLOSURE OF THE | | | AQUARIUM EQUIPMENT, ETC. ADDITIONAL DISCUSSION MAY NEED | | | TO OCCUR ON THE HOW EQUIPMENT/SERVICE AREAS ARE BEING | | | SCREENED AND WHAT DETAILS NEED TO BE PROVIDED. | | | | | | 12.1. NEW COMMENT - THE ENCLOSURE AROUND THE GENERATORS | | | DOES NOT HAVE THE REQUIRED LANDSCAPE MATERIAL | | | SURROUNDING IT. | | | | | | 12.2. NEW COMMENT - THE ENCLOSURE AROUND THE GENERATORS | | | SHALL BE OPAQUE AND THE GENERATOR SHALL NOT BE VISIBLE. | | | | | | 12.3. NEW COMMENT - HOW IS THE AQUARIUM EQUIPMENT YARD | | | PROPOSED TO BE SCREENED/LANDSCAPED? | | | | | | 12.4. NEW COMMENT - DETAIL #5 ON SHEET AS-203 IS | | | LABELED AS THE ELEVATION FOR THE DIESEL TANK STORAGE, | | | HOWEVER THIS APPEARS TO BE FOR THE LOADING/SERVICE | | | AREA. | | | | | | 12.5. NEW COMMENT - IN THE SERVICE AREA SURROUNDING | | | BUILDING 2A, THERE APPEARS TO BE REMNANTS OF FENCING | | | STILL BEING SHOWN, IN ADDITION TO THE PROPOSED WALL. | | | PLEASE CLARIFY. | | | | | | 13. SATISFIED - WHAT IS THE BUILDING SEPARATION BETWEEN | | | BUILDING 1 AND BUILDING 2? IS THIS A PART OF THE WAIVER | | | REQUEST? | | | | | | 14. PARTIALLY SATISFIED - WOULD IT BE PREFERRED TO | | | REMOVE FROM THE SITE/LANDSCAPE PLANS ANY EASEMENTS THAT | | | HAVE ALREADY BEEN ABANDONED? | | | | | | 14.1. NEW COMMENT - THERE APPEAR TO BE LABELS FOR | | | ABANDONED EASEMENTS THAT STILL EXIST ON THE LANDSCAPE | | | PLANS. | | | | | | 15. PARTIALLY SATISFIED - THERE IS DETAIL LACKING ON | | | THE SITE PLAN, SPECIFICALLY REGARDING THOSE AREAS IN | | | FRONT OF THE PROPOSED EXPANSION. GATES ARE SHOWN, BUT | | | THERE IS NOT INFORMATION AS TO WHETHER THESE GATES TIE | | | INTO PROPOSED FENCING OR WALLS, WHAT THE FENCING/WALLS | | | (IF APPLICABLE) ARE PROPOSED TO CONSIST OF, ETC. | | | | | | 15.1. NEW COMMENT - THE ARCHITECTURAL SITE PLAN | | | INDICATES A SECURITY GATE, FENCING, ETC. ALONG THE | | | SOUTH LEASE BOUNDARY; THIS IS NOT SHOWN ON THE SITE | | | PLAN AND WOULD NEED TO BE A PART OF THE WAIVER #4 | | | REQUEST AS A PORTION OF IT IS LOCATED WITHIN THE | | | "FRONT" SETBACK. | | | | | | 16. SATISFIED - SHOULDN???T BUILDING 4 BE SHADED AS A | | | ???PROPOSED BUILDING???? IS THIS BUILDING ACCOUNTED FOR | | | IN SQUARE FOOTAGES, ETC.? | | | | | | 17. SATISFIED - PLEASE CLARIFY WHAT IS BEING IDENTIFIED | | | AS THE FRONT, SIDE, REAR, ETC. AS THE PROPOSED SETBACKS | | | INDICATED IN THE SITE DATA TABLE DO NOT SEEM TO | | | CORRESPOND WITH THE SETBACKS SHOWN ON THE SITE PLAN. | | | | | | 18. PARTIALLY SATISFIED - FENCES, GATES, ETC. LOCATED | | | WITHIN THE FRONT SETBACK ARE NOT TO EXCEED FOUR (4) | | | FEET IN HEIGHT. | | | | | | 18.1. NEW COMMENT - SEE COMMENTS #11.1. AND #15.1. | | | REGARDING ADDITIONAL LOCATIONS THAT NEED TO BE | | | IDENTIFIED FOR THE WAIVER REQUEST. | | | | | | 19. SATISFIED - THE BIKE RACK AT BUILDING 5 IS ORIENTED | | | IN SUCH A WAY THAT BOTH SPACES CANNOT BE ACCESSED. | | | | | | 20. PARTIALLY SATISFIED - IN ADDITION TO THE HEIGHT OF | | | THE BUILDING AT THE ROOF DECK, PLEASE PROVIDE THE | | | HEIGHT OF THE BUILDING AS MEASURED TO THE TOP OF THE | | | PARAPET. | | | | | | 20.1. NEW COMMENT - THE HEIGHT TO THE TOP OF THE | | | PARAPET WAS PROVIDED IN THE "RESPONSE TO COMMENTS" BUT | | | DOES NOT APPEAR TO BE SHOWN ON THE PLANS. | | | | | | 21. SATISFIED - THE LANDSCAPE AREA PROPOSED, PLUS THE | | | IMPERVIOUS SURFACE AREA PROPOSED, SHOULD ADD UP TO | | | 100%. ACCORDING TO THE PROPERTY DEVELOPMENT | | | REQUIREMENTS TABLE, THE TOTAL IS ONLY 93%. | | | | | | 22. SATISFIED - EXPLANATION IS NEEDED REGARDING THE | | | SECURITY GATE AT THE NORTH END OF THE FPL SUBSTATION. | | | HOW WILL FPL MAINTAIN ACCESS FOR MAINTENANCE PURPOSES? | | | WHEN IS THE GATE OPEN/CLOSED? WILL PATRONS OF THE | | | SCIENCE CENTER BE PRESENT WHEN THIS GATE IS CLOSED AND | | | IF SO, WILL A TURNAROUND NEED TO BE PROVIDED? | | | | | | 23. NEW COMMENT - THE ARCHITECTURAL SITE PLAN | | | REFERENCES A COVERED WALKWAY BETWEEN THE BUILDINGS. | | | THIS IS NOT SHOWN ON THE SITE PLAN AND THERE IS NOT | | | ENOUGH INFORMATION/DETAIL TO UNDERSTAND WHAT IS | | | PROPOSED. WHAT IS THIS COVERING TO CONSIST OF? WHAT ARE | | | THE LIMITS OF THE COVERING? IS THE COVERING CONNECTED | | | TO EACH OF THE BUILDINGS? IF SO, THEN ALL OF THE | | | CONNECTED BUILDINGS COULD POTENTIALLY BE CLASSIFIED AS | | | ONE BUILDING (FROM A ZONING PERSPECTIVE). MORE | | | INFORMATION IS NEEDED. | | | | | | 26. NEW COMMENT - THE GRAPHIC SCALE ON THE | | | ARCHITECTURAL SITE PLAN IS INCORRECT. | | | | | | 27. NEW COMMENT ??? THE ARCHITECTURAL SITE PLAN DOES | | | NOT MATCH THE SITE PLAN. SPECIFIC AREAS INCLUDE: | | | - CHILLER ENCLOSURE IS STILL LABELED AS BUILDING #4 | | | - BUILDING #4 ON THE SITE PLAN IS LABELED AS BUILDING | | | #5 ON THE ARCHITECTURAL SITE PLAN. | | | - THE BIKE RACK SOUTH OF BUILDING #4 (AS LABELED ON THE | | | SITE PLAN) IS IN A DIFFERENT LOCATION. | | | - THE SIDEWALK NEAR THE ACCESSIBLE PARKING SOUTH OF | | | BUILDING #4 (AS LABELED ON THE SITE PLAN) IS DIFFERENT. | | | ________________________________________ | | | | | | PLEASE NOTE THE FOLLOWING WHEN RESUBMITTING: | | | | | | A) WRITTEN RESPONSES TO COMMENTS MADE BY ALL | | | DEPARTMENTS SHALL BE PROVIDED UPON RESUBMISSION. | | | | | | B) ELECTRONIC COPIES OF ALL REVISED PLANS AND/OR | | | DOCUMENTS SHALL BE PROVIDED. | | | | | | C) PLEASE NOTE THAT RE-SUBMITTALS MAY BE SUBJECT TO | | | ADDITIONAL COMMENTS. | | | | | | D) IF NO RESPONSE IS RECEIVED WITHIN 60 DAYS OF THE | | | ISSUANCE OF THESE COMMENTS, THE APPLICATION WILL BE | | | CONSIDERED WITHDRAWN AND ANY FURTHER ACTION WILL | | | REQUIRE SUBMISSION OF A NEW DEVELOPMENT APPLICATION. | | | | | | E) PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20% OF THE ORIGINAL APPLICATION FEE. | | | | | | F) IN ORDER TO BE CONSIDERED FOR THE FEBRUARY 22, 2023, | | | PLANNING BOARD AGENDA, ALL COMMENTS SHALL BE | | | SATISFACTORILY ADDRESSED. PLEASE SUBMIT ALL REVISED | | | DOCUMENTS/PLANS NO LATER THAN FRIDAY, DECEMBER 23, | | | 2022. | | | | | | G) TO BE PLACED ON THE FEBRUARY 22, 2023, PLANNING | | | BOARD AGENDA, SIGNS SHALL BE POSTED ON THE PROPERTY NO | | | LATER THAN FEBRUARY 7, 2023. SIGNAGE SHALL CONFORM, AND | | | BE INSTALLED ACCORDING TO THE REQUIREMENTS OF THE | | | CITY???S ZONING AND LAND DEVELOPMENT REGULATIONS; SUCH | | | REQUIREMENTS ARE ALSO PROVIDED IN THE DEVELOPMENT | | | APPLICATION. A SIGNED AND NOTARIZED AFFIDAVIT SHALL BE | | | PROVIDED BY THE DEADLINE REFERENCED ABOVE. | | | | | | H) IF AFTER THE CASE HAS BEEN ADVERTISED THE APPLICANT | | | DESIRES TO REQUEST A CONTINUANCE, A FEE OF $50 PLUS THE | | | COST OF ADVERTISING WILL BE CHARGED. | | | ________________________________________ | | | | | | QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING: | | | | | | JOHN P. ROACH, AICP, PRINCIPAL PLANNER | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES DEPARTMENT ??? PLANNING DIVISION | | | 401 CLEMATIS STREET - P.O. BOX 3147 | | | WEST PALM BEACH, FLORIDA 33402 | | | | | | P: 561.822.1448 | | | TTY: 800.955.8771 | | | E: [email protected] | | | | | | W: WPB.ORG |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
12-13-2022 |
|
|
Cont ID |
|
| Sent By |
jroach |
Date |
12-13-2022 |
Time |
08:21 |
Rev Time |
0.00 |
| Received By |
jroach |
Date |
12-13-2022 |
Time |
08:21 |
Sent To |
|
|
| Notes |
| 2022-12-13 08:22:13 | PLANS AND PLATS REVIEW COMMITTEE (PPRC) ZONING REVIEW | | | ________________________________________ | | | | | | DATE OF REVIEW: 12.08.2009 | | | ________________________________________ | | | | | | PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING | | | REVIEW COMMENTS: | | | | | | 1. AN APPROVED TRAFFIC PERFORMANCE STANDARDS LETTER | | | SHALL BE PROVIDED FROM THE PALM BEACH COUNTY | | | ENGINEERING DEPARTMENT ??? TRAFFIC DIVISION. | | | | | | 2. OUTSTANDING PUBLIC UTILITY LETTERS SHALL BE | | | PROVIDED. | | | | | | 3. SIGNIFICANT DISCUSSIONS WILL NEED TO CONTINUE | | | THROUGHOUT THE SITE PLAN REVIEW/PERMITTING PROCESS | | | REGARDING THE PHASING. ADDITIONAL EXHIBITS AND DATA | | | TABLES WILL LIKELY NEED TO BE PROVIDED. WILL NEED TO | | | DEMONSTRATE THAT SUFFICIENT PARKING, ACCESS, ETC. WILL | | | BE MAINTAINED THROUGHOUT CONSTRUCTION. | | | | | | 4. THE JUSTIFICATION STATEMENT INDICATES THAT THERE ARE | | | 76 SPACES PROPOSED TO BE CONSTRUCTED OUTSIDE OF THE | | | LEASE AREA, AND ARE A PART OF THE WAIVER REQUEST; THE | | | SITE PLAN SHOWS 78 SPACES. | | | | | | 5. DISCUSSIONS WILL NEED TO CONTINUE REGARDING THE | | | LIMITS OF THE MAINTENANCE OBLIGATIONS. ADDITIONAL | | | EXHIBITS WILL LIKELY NEED TO BE PROVIDED. | | | | | | 6. IS IT POSSIBLE TO MAKE THE LEASE LINE SUCH THAT IT | | | DOES NOT SPLIT THE ACCESSIBLE PARKING SPACE? IF THE | | | PARKING OUTSIDE OF THE LEASE AREA WILL BE THE | | | MAINTENANCE OBLIGATION OF THE SCIENCE CENTER, IT???S | | | NOT SO MUCH OF AN ISSUE. | | | | | | 7. PLEASE CLARIFY THE PARKING WAIVER ??? THERE IS NO | | | REQUEST TO REDUCE THE NUMBER OF REQUIRED SPACES, BUT | | | SIMPLY TO ALLOW THE SPACES TO BE LOCATED OUTSIDE OF THE | | | LEASE AREA. | | | | | | 8. THERE ARE MULTIPLE LOCATIONS WHERE TREES, GATES, | | | ETC. ARE PROPOSED TO BE LOCATED WITHIN AN EASEMENT. | | | EITHER THE TREES SHALL BE RELOCATED TO POINTS OUTSIDE | | | THE EASEMENT, OR CONSENT SHALL BE OBTAINED FROM THE | | | EASEMENT HOLDER. | | | | | | 9. ON THE SITE PLAN THERE IS A SYMBOL OF W2 ALONG THE | | | EAST LEASE LINE ??? I BELIEVE THIS SHOULD BE W3 TO | | | CORRESPOND WITH THE LANDSCAPE BUFFER WAIVER. | | | | | | 10. ON THE SITE PLAN THERE IS A SYMBOL OF W3 ALONG THE | | | WEST LEASE LINE ??? NO WAIVER IS BEING REQUESTED ALONG | | | THIS PROPERTY LINE, CORRECT? THIS SEEMS CONFUSING. THE | | | SYMBOLS FOR THE WAIVERS SHOULD BE LOCATED IN THE AREAS | | | IN WHICH THE WAIVER IS PROPOSED TO OCCUR (IF SPECIFIC | | | TO A LOCATION). | | | | | | 11. IS THE DIESEL TANK PROPOSED TO BE ABOVE OR BELOW | | | GROUND? IF ABOVE GROUND, AN OPAQUE ENCLOSURE AND | | | HEDGING SHALL BE PROVIDED ??? PLEASE PROVIDE DETAILS. | | | | | | 12. DETAILS SHALL BE PROVIDED FOR THE GENERATOR | | | ENCLOSURE, AS WELL AS ENCLOSURE OF THE AQUARIUM | | | EQUIPMENT, ETC. ADDITIONAL DISCUSSION MAY NEED TO OCCUR | | | ON THE HOW EQUIPMENT/SERVICE AREAS ARE BEING SCREENED | | | AND WHAT DETAILS NEED TO BE PROVIDED. | | | | | | 13. WHAT IS THE BUILDING SEPARATION BETWEEN BUILDING 1 | | | AND BUILDING 2? IS THIS A PART OF THE WAIVER REQUEST? | | | | | | 14. WOULD IT BE PREFERRED TO REMOVE FROM THE | | | SITE/LANDSCAPE PLANS ANY EASEMENTS THAT HAVE ALREADY | | | BEEN ABANDONED? | | | | | | 15. THERE IS DETAIL LACKING ON THE SITE PLAN, | | | SPECIFICALLY REGARDING THOSE AREAS IN FRONT OF THE | | | PROPOSED EXPANSION. GATES ARE SHOWN, BUT THERE IS NOT | | | INFORMATION AS TO WHETHER THESE GATES TIE INTO PROPOSED | | | FENCING OR WALLS, WHAT THE FENCING/WALLS (IF | | | APPLICABLE) ARE PROPOSED TO CONSIST OF, ETC. | | | | | | 16. SHOULDN???T BUILDING 4 BE SHADED AS A ???PROPOSED | | | BUILDING???? IS THIS BUILDING ACCOUNTED FOR IN SQUARE | | | FOOTAGES, ETC.? | | | | | | 17. PLEASE CLARIFY WHAT IS BEING IDENTIFIED AS THE | | | FRONT, SIDE, REAR, ETC. AS THE PROPOSED SETBACKS | | | INDICATED IN THE SITE DATA TABLE DO NOT SEEM TO | | | CORRESPOND WITH THE SETBACKS SHOWN ON THE SITE PLAN. | | | | | | 18. FENCES, GATES, ETC. LOCATED WITHIN THE FRONT | | | SETBACK ARE NOT TO EXCEED FOUR (4) FEET IN HEIGHT. | | | | | | 19. THE BIKE RACK AT BUILDING 5 IS ORIENTED IN SUCH A | | | WAY THAT BOTH SPACES CANNOT BE ACCESSED. | | | | | | 20. IN ADDITION TO THE HEIGHT OF THE BUILDING AT THE | | | ROOF DECK, PLEASE PROVIDE THE HEIGHT OF THE BUILDING AS | | | MEASURED TO THE TOP OF THE PARAPET. | | | | | | 21. THE LANDSCAPE AREA PROPOSED, PLUS THE IMPERVIOUS | | | SURFACE AREA PROPOSED, SHOULD ADD UP TO 100%. ACCORDING | | | TO THE PROPERTY DEVELOPMENT REQUIREMENTS TABLE, THE | | | TOTAL IS ONLY 93%. | | | | | | 22. EXPLANATION IS NEEDED REGARDING THE SECURITY GATE | | | AT THE NORTH END OF THE FPL SUBSTATION. HOW WILL FPL | | | MAINTAIN ACCESS FOR MAINTENANCE PURPOSES? WHEN IS THE | | | GATE OPEN/CLOSED? WILL PATRONS OF THE SCIENCE CENTER BE | | | PRESENT WHEN THIS GATE IS CLOSED AND IF SO, WILL A | | | TURNAROUND NEED TO BE PROVIDED? | | | ________________________________________ | | | | | | PLEASE NOTE THE FOLLOWING WHEN RESUBMITTING: | | | | | | A) WRITTEN RESPONSES TO COMMENTS MADE BY ALL | | | DEPARTMENTS SHALL BE PROVIDED UPON RESUBMISSION. | | | | | | B) ELECTRONIC COPIES OF ALL REVISED PLANS AND/OR | | | DOCUMENTS SHALL BE PROVIDED. | | | | | | C) PLEASE NOTE THAT RE-SUBMITTALS MAY BE SUBJECT TO | | | ADDITIONAL COMMENTS. | | | | | | D) IF NO RESPONSE IS RECEIVED WITHIN 60 DAYS OF THE | | | ISSUANCE OF THESE COMMENTS, THE APPLICATION WILL BE | | | CONSIDERED WITHDRAWN AND ANY FURTHER ACTION WILL | | | REQUIRE SUBMISSION OF A NEW DEVELOPMENT APPLICATION. | | | | | | E) PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20% OF THE ORIGINAL APPLICATION FEE. | | | | | | F) IN ORDER TO BE CONSIDERED FOR THE FEBRUARY 22, 2023, | | | PLANNING BOARD AGENDA, ALL COMMENTS SHALL BE | | | SATISFACTORILY ADDRESSED. PLEASE SUBMIT ALL REVISED | | | DOCUMENTS/PLANS NO LATER THAN FRIDAY, DECEMBER 23, | | | 2022. | | | | | | G) TO BE PLACED ON THE FEBRUARY 22, 2023, PLANNING | | | BOARD AGENDA, SIGNS SHALL BE POSTED ON THE PROPERTY NO | | | LATER THAN FEBRUARY 7, 2023. SIGNAGE SHALL CONFORM, AND | | | BE INSTALLED ACCORDING TO THE REQUIREMENTS OF THE | | | CITY???S ZONING AND LAND DEVELOPMENT REGULATIONS; SUCH | | | REQUIREMENTS ARE ALSO PROVIDED IN THE DEVELOPMENT | | | APPLICATION. A SIGNED AND NOTARIZED AFFIDAVIT SHALL BE | | | PROVIDED BY THE DEADLINE REFERENCED ABOVE. | | | | | | H) IF AFTER THE CASE HAS BEEN ADVERTISED THE APPLICANT | | | DESIRES TO REQUEST A CONTINUANCE, A FEE OF $50 PLUS THE | | | COST OF ADVERTISING WILL BE CHARGED. | | | ________________________________________ | | | | | | QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING: | | | | | | JOHN P. ROACH, AICP, PRINCIPAL PLANNER | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES DEPARTMENT ??? PLANNING DIVISION | | | 401 CLEMATIS STREET - P.O. BOX 3147 | | | WEST PALM BEACH, FLORIDA 33402 | | | | | | P: 561.822.1448 | | | TTY: 800.955.8771 | | | E: [email protected] | | | | | | W: WPB.ORG | | | |
|
|
| |
Print |
|
Account Summary | Usage Policy | Privacy Policy