| Plan Review Stops For Project Z22100042 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
|
Date |
12-30-2022 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
12-30-2022 |
Time |
17:28 |
Rev Time |
|
| Received By |
rrossano |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
P |
Date |
12-30-2022 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
12-30-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
12-30-2022 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
10-26-2022 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
10-26-2022 |
Time |
|
Rev Time |
|
| Received By |
rrossano |
Date |
10-26-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-10-26 09:16:33 | PLEASE ADVISE HOW APPROVED UTILITY LAYOUT MAY BE | | | AFFECTED AND COORDINATE WITH PREVIOUSLY APPROVED PLANS. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
11-03-2022 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
11-03-2022 |
Time |
14:37 |
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
11-03-2022 |
Time |
14:35 |
Sent To |
|
|
| Notes |
| 2022-11-03 14:37:32 | FIRE HAS NO OBJECTIONS TO THE PROPOSED AND APPROVES. | | | | | | FIRE'S APPROVAL OF THIS SUBMITTED PROJECT MAY NOT | | | CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | IF APPLICABLE, FIRE SHALL REVIEW ALL SUBMITTED PROJECT | | | PLANS AT THE APPLICABLE TIME AND IN ACCORDANCE WITH THE | | | REQUIREMENTS OF ALL APPLICABLE FIRE CODES AND | | | STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
P |
Date |
01-24-2023 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
01-24-2023 |
Time |
17:14 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
01-24-2023 |
Time |
17:14 |
Sent To |
|
|
| Notes |
| 2023-01-24 17:14:30 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: BANYAN CAY RPD/CPD MINOR PD AMENDMENT | | | Z22100042 | | | JANUARY 24, 2023 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | | | | 1. SATISFIED. THE ONLY SPACES APPROVED WITH 12 SPACES | | | IS THE 2 ROWS IN THE CENTER OF THE WEST PARKING AREA, | | | AS THE LANDSCAPE ISLANDS WERE INCREASED TO 10 FEET | | | LANDSCAPE WIDTH. THERE ARE SEVERAL LOCATIONS WITH MORE | | | THAN 10 PARKING SPACES IN A ROW THAT NEED TO BE | | | CORRECTED TO MAXIMUM 10 SPACES. THIS WILL RESULT IN A | | | CHANGE IN THE NUMBER OF LANDSCAPE ISLANDS FOR COMMENT | | | #2. | | | | | | 2. SATISFIED. SECTION 94-443(C)(3) REQUIRES THAT A | | | MINIMUM OF 75 PERCENT OF ALL TREES THAT ARE REQUIRED TO | | | BE PLANTED WITHIN THE INTERIOR OF AN OFF STREET PARKING | | | AREA SHALL BE CATEGORY 1 SHADE TREES. THERE ARE | | | CURRENTLY 37 REQUIRED LANDSCAPE ISLANDS SHOWN, OF WHICH | | | ONE IS MISSING A TREE AND THERE ARE MORE THAN 25% | | | NON-CATEGORY 1 TREES. THE CHART IN THE LANDSCAPE | | | REQUIREMENTS ON SHEET L-43 LABELED PARKING LOT | | | LANDSCAPE AREA IS NOT CORRECT AND NEEDS TO BE REVISED | | | TO REFLECT THE ACTUAL NUMBER OF REQUIRED LANDSCAPE | | | TERMINAL AND INTERIOR ISLANDS SHOWN ON THE PLAN AND THE | | | 75% REQUIREMENT SHOWN. | | | | | | 3. SATISFIED. THE CHART ON SHEET L-43 REGARDING THE | | | CALCULATIONS FOR THE LANDSCAPE AREA WITHIN THE PARKING | | | NEEDS TO BE CORRECTED TO REMOVE THE TREE AND SHRUB | | | CALCULATIONS BASED ON SQUARE FOOTAGE. | | | | | | 4. SATISFIED. CORRECT THE NOTE ON SHEET L-46 TO READ | | | ROOT BARRIER IS REQUIRED TO BE 5 FEET FROM ANY UTILITY | | | LINE PER WPB STANDARDS. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
11-15-2022 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
11-15-2022 |
Time |
16:39 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
11-15-2022 |
Time |
16:39 |
Sent To |
|
|
| Notes |
| 2022-11-15 16:39:35 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: BANYAN CAY RPD/CPD MINOR PD AMENDMENT | | | Z22100042 | | | NOVEMBER 15, 2022 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | | | | 1. THE ONLY SPACES APPROVED WITH 12 SPACES IS THE 2 | | | ROWS IN THE CENTER OF THE WEST PARKING AREA, AS THE | | | LANDSCAPE ISLANDS WERE INCREASED TO 10 FEET LANDSCAPE | | | WIDTH. THERE ARE SEVERAL LOCATIONS WITH MORE THAN 10 | | | PARKING SPACES IN A ROW THAT NEED TO BE CORRECTED TO | | | MAXIMUM 10 SPACES. THIS WILL RESULT IN A CHANGE IN THE | | | NUMBER OF LANDSCAPE ISLANDS FOR COMMENT #2. | | | | | | 2. SECTION 94-443(C)(3) REQUIRES THAT A MINIMUM OF 75 | | | PERCENT OF ALL TREES THAT ARE REQUIRED TO BE PLANTED | | | WITHIN THE INTERIOR OF AN OFF STREET PARKING AREA SHALL | | | BE CATEGORY 1 SHADE TREES. THERE ARE CURRENTLY 37 | | | REQUIRED LANDSCAPE ISLANDS SHOWN, OF WHICH ONE IS | | | MISSING A TREE AND THERE ARE MORE THAN 25% NON-CATEGORY | | | 1 TREES. THE CHART IN THE LANDSCAPE REQUIREMENTS ON | | | SHEET L-43 LABELED PARKING LOT LANDSCAPE AREA IS NOT | | | CORRECT AND NEEDS TO BE REVISED TO REFLECT THE ACTUAL | | | NUMBER OF REQUIRED LANDSCAPE TERMINAL AND INTERIOR | | | ISLANDS SHOWN ON THE PLAN AND THE 75% REQUIREMENT | | | SHOWN. | | | | | | 3. THE CHART ON SHEET L-43 REGARDING THE CALCULATIONS | | | FOR THE LANDSCAPE AREA WITHIN THE PARKING NEED TO | | | | | | 4. CORRECT THE NOTE ON SHEET L-46 TO READ ROOT BARRIER | | | IS REQUIRED TO BE 5 FEET FROM ANY UTILITY LINE PER WPB | | | STANDARDS. | | | | | | |
|
|
| Review Stop |
PU-CS |
PUBLIC UTILITIES CUSTOMER SRVC |
| Rev No |
1 |
Status |
P |
Date |
10-27-2022 |
|
|
Cont ID |
|
| Sent By |
mhurley |
Date |
10-27-2022 |
Time |
16:53 |
Rev Time |
0.00 |
| Received By |
mhurley |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-10-27 16:53:45 | UPDATE E21080021 WITH ANY CHANGES THAT ARE APPROVED. |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
P |
Date |
10-31-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
10-31-2022 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
10-31-2022 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
11-30-2022 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
11-30-2022 |
Time |
19:12 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
11-30-2022 |
Time |
19:22 |
Sent To |
|
|
| Notes |
| 2022-11-30 19:22:23 | 1. PROVIDE CROSS SECTIONS AT THE TWO DRRIVEWAYS AND AT | | | THE GOLF CART PATH ALONG THE RIGHT OF WAY. | | | | | | 2. INDICATE WITH FLOW ARROWS HOW THE SWALE AREA BETWEEN | | | THE TWO DRIVEWAYS WILL DRAIN. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | [email protected] | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
P |
Date |
11-08-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
11-08-2022 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
11-08-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-11-08 00:46:22 | APPROVED WITH THE FOLLOWING CONDITIONS: | | | | | | 1) PROVIDE BIKE SHARE DOCKING STATIONS | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
12-07-2022 |
|
|
Cont ID |
|
| Sent By |
jroach |
Date |
12-07-2022 |
Time |
14:07 |
Rev Time |
0.00 |
| Received By |
jroach |
Date |
12-07-2022 |
Time |
14:07 |
Sent To |
|
|
| Notes |
|
|
| |
Print |