Plan Review Details - Project Z22100018
| Plan Review Stops For Project Z22100018 |
| Review Stop |
AIPP |
ART IN PUBLIC PLACES |
| Rev No |
1 |
Status |
N |
Date |
01-03-2023 |
|
|
Cont ID |
|
| Sent By |
swelter |
Date |
01-03-2023 |
Time |
13:09 |
Rev Time |
0.00 |
| Received By |
swelter |
Date |
01-03-2023 |
Time |
13:09 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
02-01-2023 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
02-01-2023 |
Time |
10:48 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
02-01-2023 |
Time |
10:48 |
Sent To |
|
|
| Notes |
| 2023-02-01 10:48:42 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. NUMBER OF ACCESSIBLE PARKING SPACES. COMMENT | | | ADDRESSED. 19 ACCESSIBLE PARKING SPACES REQUIRED AND 19 | | | ACCESSIBLE PARKING SPACES WILL BE PROVIDED. WILL BE | | | CHECKED DURING BUILDING PERMIT REVIEW AND INSPECTION. | | | THE SURVEY DRAWING SHOWS 3 ACCESSIBLE PARKING SPACES IN | | | KINGS COURT LOT 4 WHICH IS UNDER THE FOOTPRINT OF THE | | | PROPOSED BUILDING, AND THE SITE PLAN, SP-1, DOES NOT | | | SHOW THEM ALL BEING REPLACED. THE MINIMUM NUMBER OF | | | ACCESSIBLE PARKING SPACES PROVIDED SHALL BE IN | | | ACCORDANCE WITH SECTION 208.2 OF FLORIDA ACCESSIBILITY | | | CODE. | | | | | | 3. LOCATION OF ACCESSIBLE PARKING SPACES. PER SECTION | | | 208.3 OF FLORIDA ACCESSIBILITY CODE, ACCESSIBLE PARKING | | | SPACES ARE TO BE LOCATED ON THE SHORTEST POSSIBLE ROUTE | | | OF TRAVEL FROM ADJACENT PARKING TO AN ACCESSIBLE | | | ENTRANCE. THE DESIGN OF ACCESSIBLE PARKING SPACES SHALL | | | COMPLY WITH SECTION 502 OF FLORIDA ACCESSIBILITY CODE | | | | | | 4. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 5. GREASE INTERCEPTOR. IF FOOD IS BEING PREPARED ONSITE | | | FOR THE DINING ROOM A GREASE INTERCEPTOR WILL BE | | | REQUIRED. FOR INFORMATION ON THE REQUIRED TYPE, SIZE | | | AND LOCATION, PLEASE CONTACT RYAN BROWN, CHIEF PLUMBING | | | INSPECTOR, DEVELOPMENT SERVICES DEPARTMENT, AT (561) | | | 805-6692, OR BY EMAIL: [email protected] | | | | | | 6. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS, | | | GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND | | | OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS, | | | SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC. | | | | | | 7. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND | | | CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF | | | CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL | | | NEIGHBORING PROPERTIES. | | | | | | 8. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER | | | AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY, | | | INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE | | | CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF | | | NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION | | | THAT MAY AFFECT THE USE OF THEIR PROPERTY. | | | | | | 9. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT | | | WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL | | | HAVE A SEPARATE ADDRESS ASSIGNED BASED ON THE LOCATION | | | OF THE BUILDING ENTRANCE. FOR STREET ADDRESSING, | | | CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT | | | (561) 805 6659, OR BY EMAIL: [email protected] | | | | | | 10. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT | | | TO ART LIFE ASSESSMENT UNDER THE CITY OF WEST PALM | | | BEACH ART IN PUBLIC PLACES (AIPP) PROGRAM. FOR ADVICE | | | ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP | | | ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC | | | PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL: | | | [email protected] | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
11-10-2022 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
11-10-2022 |
Time |
13:35 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
11-10-2022 |
Time |
13:35 |
Sent To |
|
|
| Notes |
| 2022-11-10 13:43:00 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. NUMBER OF ACCESSIBLE PARKING SPACES. THE SURVEY | | | DRAWING SHOWS 3 ACCESSIBLE PARKING SPACES IN KINGS | | | COURT LOT 4 WHICH IS UNDER THE FOOTPRINT OF THE | | | PROPOSED BUILDING, AND THE SITE PLAN, SP-1, DOES NOT | | | SHOW THEM ALL BEING REPLACED. THE MINIMUM NUMBER OF | | | ACCESSIBLE PARKING SPACES PROVIDED SHALL BE IN | | | ACCORDANCE WITH SECTION 208.2 OF FLORIDA ACCESSIBILITY | | | CODE. | | | | | | 3. LOCATION OF ACCESSIBLE PARKING SPACES. PER SECTION | | | 208.3 OF FLORIDA ACCESSIBILITY CODE, ACCESSIBLE PARKING | | | SPACES ARE TO BE LOCATED ON THE SHORTEST POSSIBLE ROUTE | | | OF TRAVEL FROM ADJACENT PARKING TO AN ACCESSIBLE | | | ENTRANCE. THE DESIGN OF ACCESSIBLE PARKING SPACES SHALL | | | COMPLY WITH SECTION 502 OF FLORIDA ACCESSIBILITY CODE | | | | | | 4. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 5. GREASE INTERCEPTOR. IF FOOD IS BEING PREPARED ONSITE | | | FOR THE DINING ROOM A GREASE INTERCEPTOR WILL BE | | | REQUIRED. FOR INFORMATION ON THE REQUIRED TYPE, SIZE | | | AND LOCATION, PLEASE CONTACT RYAN BROWN, CHIEF PLUMBING | | | INSPECTOR, DEVELOPMENT SERVICES DEPARTMENT, AT (561) | | | 805-6692, OR BY EMAIL: [email protected] | | | | | | 6. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS, | | | GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND | | | OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS, | | | SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC. | | | | | | 7. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND | | | CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF | | | CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL | | | NEIGHBORING PROPERTIES. | | | | | | 8. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER | | | AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY, | | | INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE | | | CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF | | | NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION | | | THAT MAY AFFECT THE USE OF THEIR PROPERTY. | | | | | | 9. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT | | | WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL | | | HAVE A SEPARATE ADDRESS ASSIGNED BASED ON THE LOCATION | | | OF THE BUILDING ENTRANCE. FOR STREET ADDRESSING, | | | CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT | | | (561) 805 6659, OR BY EMAIL: [email protected] | | | | | | 10. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT | | | TO ART LIFE ASSESSMENT UNDER THE CITY OF WEST PALM | | | BEACH ART IN PUBLIC PLACES (AIPP) PROGRAM. FOR ADVICE | | | ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP | | | ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC | | | PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL: | | | [email protected] | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
4 |
Status |
P |
Date |
03-29-2023 |
|
|
Cont ID |
|
| Sent By |
lquinone |
Date |
03-29-2023 |
Time |
07:36 |
Rev Time |
0.00 |
| Received By |
lquinone |
Date |
03-29-2023 |
Time |
07:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
3 |
Status |
F |
Date |
03-02-2023 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
03-02-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
03-02-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-03-02 10:44:35 | PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND | | | STORMWATER INFRASTRUCTURE ALONG ENTIRE PROJECT FRONTAGE | | | (CONDITION OF SITE PLAN APPROVAL). | | | | | | COMMENTS FROM RICK ROSSANO, SR. PROJECT COORDINATOR, | | | ENGINEERING SERVICES AT 561-494-1098 [email protected] |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
F |
Date |
12-30-2022 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
12-30-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
12-30-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-12-30 17:18:44 | PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND | | | STORMWATER INFRASTRUCTURE ALONG ENTIRE PROJECT FRONTAGE | | | (CONDITION OF SITE PLAN APPROVAL). | | | | | | COMMENTS FROM RICK ROSSANO, SR. PROJECT COORDINATOR, | | | ENGINEERING SERVICES AT 561-494-1098 [email protected] |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
10-25-2022 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
10-25-2022 |
Time |
|
Rev Time |
|
| Received By |
rrossano |
Date |
10-25-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-10-25 12:02:30 | Z22100018 - | | | GENERAL: | | | O PLEASE RESPOND TO ALL COMMENTS IN WRITING, AND | | | INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER | | | (Z-XXXXXXXX). | | | O THE CITY OF WEST PALM BEACH HAS A NUMBER OF | | | REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY | | | AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND | | | WASTEWATER UTILITIES WITHIN THE CITY. PLEASE SEE | | | DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AT THE LINK | | | BELOW: | | | A. HTTP://WPB.ORG/CMSPAGES/GETAMAZONFILE.ASPX?PATH=~\WP | | | B_WEBSITE\MEDIA\ENGINEERING\DEVELOPMENT-APPLICATION-FUL | | | L-PACKAGE_2016.PDF&HASH=7BD4DD7EB6115181D8C5977BCC02A97 | | | B1960045731D3658206F27451722716EF | | | B. THIS AND OTHER RELATED ENGINEERING DOCUMENTS CAN BE | | | FOUND HERE: | | | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR | | | MS,-PERMITS-APPLICATIONS | | | C. ALSO SEE: CODE OF ORDINANCES, CITY OF WEST PALM | | | BEACH, FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, | | | ADOPTED SEPT. 22, 2008. (SUPPLEMENT NO. 18) | | | CHAPTER 90 UTILITIES, ARTICLE I. IN GENERAL, | | | SEC. 90-7. POLICY REGARDING EXTENSION OF WATER OR SEWER | | | SERVICE FACILITIES OF THE CITY. | | | THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE | | | CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY | | | BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS, | | | BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION. | | | O AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH | | | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, | | | STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR | | | MORE INFORMATION, REFER TO THE LINK BELOW: | | | A. HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PU | | | BLICATIONS/BACKFLOW-CROSS-CONNECTION- CONTROL-MANUAL | | | O PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY | | | OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC | | | RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF | | | YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE | | | MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL | | | IN THE WPB ENGINEERING SERVICES DEPARTMENT AT | | | [email protected] OR 561-494-1079 FOR FURTHER | | | ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION | | | ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD | | | SURVEY, POT-HOLING, SOFT DIGS ETC. | | | O PROVIDE EXISTING AND PROPOSED PERVIOUS AND IMPERVIOUS | | | DATA. | | | | | | BACKFLOW ASSEMBLY AND METERS: | | | O SHOW AND LABEL ANY EXISTING OR PROPOSED WATER | | | SERVICES AND WATER METERS, ALONG WITH WHAT IS HAPPENING | | | TO THEM. | | | O SHOW EXISTING AND PROPOSED DEDICATED UTILITY | | | EASEMENTS TO ALLOW ACCESS FOR CITY PERSONNEL TO | | | PROPOSED UTILITY WATER METERS. VERIFY THAT THERE ARE NO | | | STRUCTURES WITHIN EASEMENT. | | | O PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED LOCATION | | | OF WATER METER AND BACKFLOW | | | PREVENTION. | | | O BACKFLOWS SHALL BE INSTALLED ON PRIVATE PROPERTY | | | OUTSIDE OF EASEMENTS AND RIGHTS OF WAY. DOMESTIC WATER | | | METERS SHALL BE INSTALLED IMMEDIATELY ADJACENT TO | | | PROPERTY LINE. 3 INCH AND LARGER WATER METERS SHALL BE | | | INSTALLED ABOVE-GROUND ONLY. | | | O CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA (MAKE | | | NOTE USC APPROVED) AND FIRE BACKFLOW PREVENTER AS DCDA. | | | | | | WATER/WASTEWATER PLAN: | | | O PROVIDE VERTICAL DATUM AND DATUM CONVERSION | | | INFORMATION (NAVD 1988 AND NGVD 1929). | | | O SHOW PROJECT ADDRESS ON ALL PLAN SHEETS. | | | O PROVIDE LEGEND ON ALL PLAN SHEETS TO INCLUDE | | | STREETLIGHT, SIGN POSTS, TRANSFORMER BOXES ETC. | | | O PLANS SHALL SHOW EXISTING AND PROPOSED LOCATIONS AND | | | DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND | | | SEWER LINES AND CLEANOUTS, INCLUDING STUBS TO EACH | | | PROPERTY LINE FOR WATER AND SANITARY SEWERS, THE MAKE | | | AND MODEL OF ALL VALVES, POTABLE AND IRRIGATION METERS, | | | BACKFLOWS, FIRE HYDRANTS AND FDCS, AND OTHER DEVICES TO | | | BE INSTALLED ON THE SYSTEM, CATCH BASINS, CULVERTS, | | | DITCHES INCLUDING GRADES, PIPES SIZES, MATERIALS, | | | ELEVATIONS, ASSUMPTIONS, CALCULATIONS, INVERT | | | ELEVATIONS FOR ALL INLETS AND MANHOLES AND PROFILES OF | | | SANITARY SEWER LINES. | | | O GATE VALVE BOXES SHALL NOT BE INSTALLED IN CURB OR | | | SIDEWALK. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE | | | PROFILE VIEW. | | | O DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN | | | VIEW FOR ALL SANITARY AND STORM SEWERS. | | | O SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT | | | MATERIAL. | | | O PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED | | | UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC, | | | ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION | | | FACILITIES INCLUDING PIPE SIZE AND MATERIAL LOCATED IN | | | THE RIGHT-OF-WAY. | | | O PROVIDE PROFILE AND CLEARANCES BETWEEN WATER, SEWER | | | AND STORM LINES PER CITY OF WEST PALM BEACH STANDARD | | | DETAIL GN-2 SERIES, AT ALL UTILITY CROSSINGS. PLEASE | | | INCLUDE FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION & | | | TELECOMMUNICATION FACILITIES INCLUDING PIPE SIZE AND | | | MATERIAL LOCATED IN THE RIGHT-OF-WAY. | | | O SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE DIRECTLY | | | TO ENGINEERING (SHEET 33 OF CITY OF WPB DEVELOPMENT | | | APPLICATION). PROVIDE CALCULATIONS ON PLANS OF EXISTING | | | AND PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, | | | MAXIMUM AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS | | | SHALL BE PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 | | | FOR WATER. | | | O PROVIDE FIRE FLOW TEST DATA. | | | O PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND | | | STORMWATER INFRASTRUCTURE ALONG ENTIRE PROJECT FRONTAGE | | | (CONDITION OF SITE PLAN APPROVAL). | | | O CUT AND CAP UTILITIES NOT IN USE AND REMOVE ANY | | | ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY | | | ROW. | | | O WHEN PROPOSED, WATER MAINS IN CITY RIGHT OF WAY SHALL | | | BE MADE OF DUCTILE IRON PIPE (NOT PVC) AND SPECIFY | | | PROPOSED LENGTH IN FEET. | | | O CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY | | | SEWER ARE REQUIRED. | | | O PROVIDE CLEANOUTS FOR PROPOSED SANITARY LINE ONSITE | | | JUST INSIDE PROPERTY LINE, AT JOINTS AND EVERY 75 FEET. | | | O ADD NOTE TO PLANS SPECIFYING CITY???S DOWNSTREAM LIFT | | | STATION NUMBER. | | | O PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR | | | PROPOSED SANITARY LATERALS. | | | O LABEL WATER LINES AS PRIVATE WHERE APPLICABLE. | | | O PLEASE SHOW AND LABEL EXISTING AND PROPOSED GREASE | | | TRAPS (IF ANY). | | | O PER CITY STANDARDS MAINTAIN MINIMUM DISTANCE BETWEEN | | | OUTSIDE DIAMETER OF CITY PIPE AND ROOT BARRIER. | | | | | | FORMAL ENGINEERING REVIEW: | | | O FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND NPDES | | | NOI REQUIREMENTS WILL BE ENFORCED. | | | - AN NOI IS REQUIRED FOR PROJECTS THAT: | | | - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS | | | THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF | | | DEVELOPMENT OR SALE; | | | - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE | | | STATE OR TO SURFACE WATERS OF THE STATE THROUGH A | | | MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4). | | | - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF | | | CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION | | | THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL | | | SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT | | | OF THE 10-2 CERTIFICATION. | | | O FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | EASEMENT FOR PLACEMENT OF PROPOSED WATER METERS. | | | O FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES OF | | | WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS. | | | O FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING | | | APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT | | | SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING | | | SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED | | | LEAD-FREE DESIGN. | | | O FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY LINES | | | ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY | | | LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT | | | PARCELS. | | | O FOR FORMAL ENGINEERING SUBMITTAL, IF WATER LINES ARE | | | BEING REPLACED IN ROW, SHOW ADJACENT PARCEL ADDRESSES. | | | O FOR FORMAL ENGINEERING SUBMITTAL, ADD NOTE TO PROVIDE | | | 50 FT. PAVEMENT RESTORATION TRANSITION ON EACH SIDE OF | | | PROPOSED TRENCH IN CITY MAINTAINED ROADWAY AREAS PER | | | CITY OF WPB STANDARD DETAIL GC-8. | | | O FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | CALCULATIONS OF PERVIOUS AND IMPERVIOUS AREAS FOR | | | PROPOSED IMPROVED AREAS. | | | | | | QUESTIONS AND COORDINATION CONTACTS: | | | O MARK HURLEY, FIELD CUSTOMER SERVICE SUPERVISOR WITH | | | CITY OF WPB PUBLIC UTILITIES, REGARDING PLACEMENT OF | | | BACKFLOW DEVICES AND WATER METERS. CONTACT HIM AT | | | 561-822-2262 OR [email protected] | | | O MIKE TECHNOW, PROJECT ENGINEER, PUBLIC UTILITIES | | | DEPARTMENT AT 561-494-1047 OR [email protected] | | | O TRACY WARD, SR. STORMWATER ENGINEER, ENGINEERING | | | SERVICES DEPT. AT 561-494-1120 OR [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
10-27-2022 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
10-27-2022 |
Time |
11:15 |
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
10-27-2022 |
Time |
11:14 |
Sent To |
|
|
| Notes |
| 2022-10-27 11:23:25 | GENERAL CONSTRUCTION PROJECT | | | | | | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, | | | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM | | | BEACH FIRE DEPARTMENT. | | | | | | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE | | | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. | | | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS | | | ARE SUBMITTED FOR PERMIT. | | | | | | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE | | | PROPOSED PROJECT. THE FOLLOWING COMMENTS ARE INTENDED | | | TO PROVIDE GUIDANCE FOR BUILDING PLAN SUBMITTAL. | | | | | | 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY | | | WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE | | | PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A | | | PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED | | | TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN | | | STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY | | | MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER | | | PROTECTION. | | | | | | 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY | | | IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING | | | ALL CONSTRUCTION ACTIVITIES. | | | | | | 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM | | | ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION. | | | ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND | | | AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT | | | WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS. | | | | | | 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE | | | REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE | | | ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS. | | | | | | 5. THE CONSTRUCTION OF THE BUILDING(S) SHALL COMPLY | | | WITH THE 7TH EDITION OF THE FLORIDA FIRE PREVENTION | | | CODE, INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE | | | CODES. | | | | | | 6. FOR PLAN REVIEW SUBMITTAL, PLEASE INCLUDE THE | | | OCCUPANCY TYPE PER THE FLORIDA FIRE PREVENTION CODE. | | | | | | 7. FOR PLAN REVIEW SUBMITTAL, PLEASE ENSURE THAT A FIRE | | | LOAD CALCULATION IS INCLUDED, AND THAT ADEQUATE WATER | | | SUPPLY IS EXISTING OR WILL BE PROVIDED. | | | | | | 8. ANY EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED | | | ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF | | | FIRE PREVENTION. | | | | | | ANY PROPOSED LOCATION(S) OF THE FIRE HYDRANT AND FDC | | | SHALL BE WITHIN 100' OF EACH OTHER AND CLOSELY | | | COORDINATED WITH THE BUREAU OF FIRE PREVENTION. | | | | | | 9. PROVIDE FOR A FIRE SPRINKLER AND/OR FIRE ALARM PER | | | THE APPLICABLE OCCUPANCY CODE. | | | | | | FOR ANY LIFE SAFETY ENGINEERED SYSTEM, I.E FIRE | | | SPRINKLER AND FIRE ALARM, ENSURE THEY COMPLY WITH THE | | | REQUIREMENTS OF F.A.C. 61G AND SUBMITTED WITH THE | | | MASTER PERMIT. | | | | | | 9A. THE LOCATION OF ANY APPLICABLE DDCV AND FIRE LINE | | | LOCATIONS SHALL MEET AND BE INSTALLED PER THE | | | REQUIREMENTS OF NFPA 24 AND SHALL BE COORDINATED WITH | | | THE OFFICE OF FIRE MARSHAL, THE CITY'S ENGINEERS | | | OFFICE, THE LANDSCAPE PLANNER, AND THE CITY'S PLANNING | | | AND ZONING OFFICE. | | | | | | 10. COMPLETE LIFE SAFETY PLANS FOR THE OCCUPANCY SHALL | | | BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL | | | DISTANCES, EXIT SEPARATION DISTANCES, COMMON PATHS OF | | | TRAVEL, DEAD-END CORRIDORS, EXIT SIGNS, EMERGENCY | | | LIGHTING, EXITS LEADING TO A PUBLIC WAY, FIRE | | | EXTINGUISHER LOCATIONS, AND ALL FIRE SAFETY FEATURES | | | AND EQUIPMENT. | | | | | | 11. IT IS HIGHLY RECOMMENDED (REQUIRED WITH FIRE | | | SPRINKLER SYSTEM) THAT A KNOX BOX WITH KEYS FOR ENTRY | | | DOOR LOCKS BE PROVIDED FOR 24 HOUR EMERGENCY ACCESS. | | | | | | 12. AREAS OF REFUGE SHALL BE PROVIDED AS REQUIRED PER | | | THE FLORIDA BUILDING CODE AND NFPA 101, CH 7, MEANS OF | | | EGRESS. | | | | | | 12A. ALL ELEVATORS SHALL BE EQUIPPED WITH A REGION 7 | | | KEYWAY SYSTEM. | | | | | | ALL NEW ELEVATORS SHALL CONFORM TO THE FIRE FIGHTER???S | | | EMERGENCY OPERATIONS REQUIREMENTS OF ASME A17.1/CSA | | | B44, SAFETY CODE FOR ELEVATORS. | | | | | | ANY BUILDING THAT IS MORE THAN THREE STORIES HIGH OR IN | | | WHICH THE VERTICAL DISTANCE BETWEEN THE BOTTOM TERMINAL | | | LANDING AND THE TOP TERMINAL LANDING EXCEEDS 25 FEET | | | MUST BE CONSTRUCTED TO CONTAIN AT LEAST ONE PASSENGER | | | ELEVATOR THAT IS OPERATIONAL AND WILL ACCOMMODATE AN | | | AMBULANCE STRETCHER 76 INCHES LONG AND 24 INCHES WIDE | | | IN THE HORIZONTAL POSITION. | | | | | | 13. TWO-WAY RADIO COMMUNICATIONS ENHANCEMENT SYSTEMS. | | | | | | NFPA 1, CHAPTER 11, BUILDING SERVICES; 11.10 TWO-WAY | | | RADIO ENHANCEMENT SERVICES. | | | 11.10.1 IN ALL NEW AND EXISTING BUILDINGS, MINIMUM | | | RADIO SIGNAL STRENGTH FOR FIRE DEPARTMENT | | | COMMUNICATIONS SHALL BE MAINTAINED AT A LEVEL | | | DETERMINED BY THE AHJ. | | | | | | CONTACT WILL NEED TO BE MADE TO MARK FILLA, PALM BEACH | | | COUNTY PUBLIC SAFETY RADIO SYSTEMS MANAGER, | | | [email protected], 561-233-0837; AS OUR RADIOS OPERATE | | | ON THEIR SYSTEM FOR DETAILED RADIO FREQUENCY AND | | | INSTALLATION INSTRUCTIONS. | | | | | | 14. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT | | | DOES NOT CONSTITUTE ITS FINAL REVIEW OR APPROVAL. | | | | | | 15. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING | | | PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH | | | THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
3 |
Status |
P |
Date |
03-13-2023 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
03-09-2023 |
Time |
17:06 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
03-09-2023 |
Time |
17:06 |
Sent To |
|
|
| Notes |
| 2023-03-13 17:07:05 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: PBAU Z22100018 | | | MARCH 13, 2023 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. MAKE THE FOLLOWING CORRECTIONS TO THE TREE | | | DISPOSITION LIST: | | | ??? SATISFIED. PROVIDE THE TREE DISPOSITION INVENTORY | | | MAP AS AN OVERLAY TO THE EXISTING SITE CONFIGURATION AS | | | SHOWN ON THE SURVEY, NOT THE PROPOSED SITE PLAN SO THAT | | | THE LOCATIONS MATCH THE TREE SURVEY. | | | ??? SATISFIED. MOVE ALL MITIGATION INFORMATION TO THE | | | TREE DISPOSITION SHEETS, SHOULD NOT BE ON THE LANDSCAPE | | | SHEETS. | | | ??? SATISFIED. CORRECT BOTANICAL NAME FOR MAHOGANY IN | | | THE ARBORIST REPORT. | | | ??? SATISFIED. TREES PROPOSED TO BE REMOVED WITH A | | | CANOPY DIAMETER OF 20 FEET OR MORE SHOULD HAVE THE | | | MITIGATION SQUARE FOOTAGE CALCULATED BASED ON THE | | | ACTUAL DIAMETER. TREES LESS THAN 20 FEET CANOPY | | | DIAMETER AND PALMS SHOULD SHOW THE CATEGORY MITIGATION | | | DUE AS SQUARE FOOTAGE. | | | ??? SATISFIED. PROVIDE THE TOTAL MITIGATION SQUARE | | | FOOTAGE DUE INCLUDING THE PALM MITIGATION. | | | ??? SATISFIED. PROVIDE THE MITIGATION CREDITS BASED ON | | | THE PLANT LIST BY TREE CATEGORY AND PROVIDE A TOTAL | | | SQUARE FOOTAGE. | | | ??? SATISFIED. CORRECT NOTE ON L1.2 ALL CANOPY | | | MITIGATION MUST BE PROVIDED ON SITE OR PAYMENT IN LIEU | | | PAYMENT MADE TO THE CANOPY MITIGATION FUND. | | | 1/26/23 BONDING IS NOT AN OPTION BY CODE PER THE | | | PLANNING AND ZONING ADMINISTRATOR. | | | | | | 2. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE | | | TREES AND PALMS IN GOOD CONDITION TO BE PRESERVED ON | | | SITE OR RELOCATED. PROVIDE THE DETAILS OF THE CONDITION | | | FOR EACH NATIVE TREE OR PALM PROPOSED TO BE REMOVED IN | | | THE ARBORISTS REPORT AND EXPLAIN THE REASON FOR REMOVAL | | | PER SECTION 94-448. | | | | | | 3. SATISFIED. PROVIDE INFORMATION ON WHAT HAPPENED TO | | | THE KAPOK TREE THAT WAS LOCATED ON THIS SITE. | | | VERY SAD THAT THIS TREE WAS LOST. | | | | | | | | | 4. SATISFIED. THE LACK OF TREE CANOPY AND THE EXTENSIVE | | | PAVED AREAS IN THE DESIGN AROUND THE PROPOSED BUILDING | | | IS NOTED, THE HEAT ISLAND CREATED WILL NOT BE | | | PEDESTRIAN FRIENDLY. THERE IS A DEFICIT OF TREE CANOPY | | | REPLACEMENT. | | | 1/26/23 THE TREE CANOPY MITIGATION CAN BE ADDED | | | ANYWHERE WITHIN THE CSPD BOUNDARY. THE ADDED TREES | | | CANNOT BE REPLACEMENTS FOR TREES THAT ARE MISSING AND | | | SHOULD BE REPLACED AS REQUIRED AS SHOWN ON APPROVED | | | PLANS OR ARE OBVIOUS REQUIRED TREES SUCH AS IN PARKING | | | AREAS. A MASTER PLAN MAY BE SUBMITTED WITH TREE | | | LOCATIONS, SPECIES AND SIZES INDICATED THAT WOULD BE | | | REVIEWED AND APPROVED WITH THIS PETITION, AND THE PLAN | | | THEN SUBMITTED WITH THE LANDSCAPE PERMIT FOR THE | | | BUSINESS SCHOOL PROJECT. THIS WOULD REQUIRE THE TREES | | | TO BE PLANTED AND THE LANDSCAPE COMPLETED PRIOR TO THE | | | CO FOR THE NEW BUILDING. | | | | | | | | | | | | 5. SATISFIED. THE BUFFER ALONG OLIVE NEEDS TO CONSIST | | | OF TREES APPROPRIATE UNDER THE POWER LINES TO PROVIDE | | | SHADE FOR THE SIDEWALK INSTEAD OF PALMS. | | | | | | 6. SATISFIED. CORRECT THE FLORIDA FRIENDLY LANDSCAPE | | | DESIGN OPTIONS CHART TO ELIMINATE TAKING 51% IN TWICE | | | IN THE SAME OPTION. SEE (3)GROUNDCOVER, (4) SHRUBS, AND | | | (5) TREES. | | | SOD AREA FOR OPTION #7 IS DIFFICULT TO VERIFY, SUGGEST | | | DROP FROM LIST. | | | | | | | | | 7. SATISFIED. SHOW LOCATIONS OF BACKFLOWS AND ADJUST | | | LOCATIONS OF UTILITY LINES TO RESOLVE CONFLICTS WITH | | | EXISTING AND PROPOSED TREES AND LANDSCAPING, AS THERE | | | ARE MULTIPLE CONFLICTS SHOWN. | | | | | | 8. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L. | | | PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT | | | MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT | | | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE | | | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH | | | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH | | | FLORIDA LANDSCAPES. PROVIDE ONE ACTUAL PERCENTAGE BASED | | | ON THE PLANT LIST. | | | | | | 9. SATISFIED. PROVIDE SCREENING HEDGES FOR ALL GROUND | | | MOUNTED VALVES AND EQUIPMENT. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | 2. PRIOR TO ISSUANCE OF THE FIRST BUILDING PERMIT FOR | | | THE BUILDING, THE APPLICANT SHALL SUBMIT A REVISED | | | LANDSCAPE PLAN WITH THE TREE ALTERATION PERMIT SHOWING | | | THE LOCATIONS AND SPECIES OF THE TREES TO MEET THE TREE | | | MITIGATION REQUIRED ON SITE FOR REVIEW. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
F |
Date |
01-26-2023 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
01-26-2023 |
Time |
12:39 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
01-26-2023 |
Time |
12:39 |
Sent To |
|
|
| Notes |
| 2023-01-26 12:40:33 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: PBAU Z22100018 | | | JANUARY 26, 2023 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. MAKE THE FOLLOWING CORRECTIONS TO THE TREE | | | DISPOSITION LIST: | | | ??? SATISFIED. PROVIDE THE TREE DISPOSITION INVENTORY | | | MAP AS AN OVERLAY TO THE EXISTING SITE CONFIGURATION AS | | | SHOWN ON THE SURVEY, NOT THE PROPOSED SITE PLAN SO THAT | | | THE LOCATIONS MATCH THE TREE SURVEY. | | | ??? SATISFIED. MOVE ALL MITIGATION INFORMATION TO THE | | | TREE DISPOSITION SHEETS, SHOULD NOT BE ON THE LANDSCAPE | | | SHEETS. | | | ??? SATISFIED. CORRECT BOTANICAL NAME FOR MAHOGANY IN | | | THE ARBORIST REPORT. | | | ??? SATISFIED. TREES PROPOSED TO BE REMOVED WITH A | | | CANOPY DIAMETER OF 20 FEET OR MORE SHOULD HAVE THE | | | MITIGATION SQUARE FOOTAGE CALCULATED BASED ON THE | | | ACTUAL DIAMETER. TREES LESS THAN 20 FEET CANOPY | | | DIAMETER AND PALMS SHOULD SHOW THE CATEGORY MITIGATION | | | DUE AS SQUARE FOOTAGE. | | | ??? SATISFIED. PROVIDE THE TOTAL MITIGATION SQUARE | | | FOOTAGE DUE INCLUDING THE PALM MITIGATION. | | | ??? SATISFIED. PROVIDE THE MITIGATION CREDITS BASED ON | | | THE PLANT LIST BY TREE CATEGORY AND PROVIDE A TOTAL | | | SQUARE FOOTAGE. | | | ??? NOT SATISFIED. CORRECT NOTE ON L1.2 ALL CANOPY | | | MITIGATION MUST BE PROVIDED ON SITE OR PAYMENT IN LIEU | | | PAYMENT MADE TO THE CANOPY MITIGATION FUND. | | | 1/26/23 BONDING IS NOT AN OPTION BY CODE PER THE | | | PLANNING AND ZONING ADMINISTRATOR. | | | | | | 2. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE | | | TREES AND PALMS IN GOOD CONDITION TO BE PRESERVED ON | | | SITE OR RELOCATED. PROVIDE THE DETAILS OF THE CONDITION | | | FOR EACH NATIVE TREE OR PALM PROPOSED TO BE REMOVED IN | | | THE ARBORISTS REPORT AND EXPLAIN THE REASON FOR REMOVAL | | | PER SECTION 94-448. | | | | | | 3. SATISFIED. PROVIDE INFORMATION ON WHAT HAPPENED TO | | | THE KAPOK TREE THAT WAS LOCATED ON THIS SITE. | | | VERY SAD THAT THIS TREE WAS LOST. | | | | | | | | | 4. NOT SATISFIED. THE LACK OF TREE CANOPY AND THE | | | EXTENSIVE PAVED AREAS IN THE DESIGN AROUND THE PROPOSED | | | BUILDING IS NOTED, THE HEAT ISLAND CREATED WILL NOT BE | | | PEDESTRIAN FRIENDLY. THERE IS A DEFICIT OF TREE CANOPY | | | REPLACEMENT. | | | 1/26/23 THE TREE CANOPY MITIGATION CAN BE ADDED | | | ANYWHERE WITHIN THE CSPD BOUNDARY. THE ADDED TREES | | | CANNOT BE REPLACEMENTS FOR TREES THAT ARE MISSING AND | | | SHOULD BE REPLACED AS REQUIRED AS SHOWN ON APPROVED | | | PLANS OR ARE OBVIOUS REQUIRED TREES SUCH AS IN PARKING | | | AREAS. A MASTER PLAN MAY BE SUBMITTED WITH TREE | | | LOCATIONS, SPECIES AND SIZES INDICATED THAT WOULD BE | | | REVIEWED AND APPROVED WITH THIS PETITION, AND THE PLAN | | | THEN SUBMITTED WITH THE LANDSCAPE PERMIT FOR THE | | | BUSINESS SCHOOL PROJECT. THIS WOULD REQUIRE THE TREES | | | TO BE PLANTED AND THE LANDSCAPE COMPLETED PRIOR TO THE | | | CO FOR THE NEW BUILDING. | | | | | | | | | | | | 5. SATISFIED. THE BUFFER ALONG OLIVE NEEDS TO CONSIST | | | OF TREES APPROPRIATE UNDER THE POWER LINES TO PROVIDE | | | SHADE FOR THE SIDEWALK INSTEAD OF PALMS. | | | | | | 6. PARTIALLY SATISFIED. CORRECT THE FLORIDA FRIENDLY | | | LANDSCAPE DESIGN OPTIONS CHART TO ELIMINATE TAKING 51% | | | IN TWICE IN THE SAME OPTION. SEE (3)GROUNDCOVER, (4) | | | SHRUBS, AND (5) TREES. | | | SOD AREA FOR OPTION #7 IS DIFFICULT TO VERIFY, SUGGEST | | | DROP FROM LIST. | | | | | | | | | 7. SATISFIED. SHOW LOCATIONS OF BACKFLOWS AND ADJUST | | | LOCATIONS OF UTILITY LINES TO RESOLVE CONFLICTS WITH | | | EXISTING AND PROPOSED TREES AND LANDSCAPING, AS THERE | | | ARE MULTIPLE CONFLICTS SHOWN. | | | | | | 8. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L. | | | PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT | | | MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT | | | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE | | | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH | | | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH | | | FLORIDA LANDSCAPES. PROVIDE ONE ACTUAL PERCENTAGE BASED | | | ON THE PLANT LIST. | | | | | | 9. SATISFIED. PROVIDE SCREENING HEDGES FOR ALL GROUND | | | MOUNTED VALVES AND EQUIPMENT. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
11-14-2022 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
11-08-2022 |
Time |
09:05 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
11-08-2022 |
Time |
09:05 |
Sent To |
|
|
| Notes |
| 2022-11-14 09:06:28 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: PBAU Z22100017 | | | NOVEMBER 8, 2022 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. MAKE THE FOLLOWING CORRECTIONS TO THE TREE | | | DISPOSITION LIST: | | | ??? PROVIDE THE TREE DISPOSITION INVENTORY MAP AS AN | | | OVERLAY TO THE EXISTING SITE CONFIGURATION AS SHOWN ON | | | THE SURVEY, NOT THE PROPOSED SITE PLAN SO THAT THE | | | LOCATIONS MATCH THE TREE SURVEY. | | | ??? MOVE ALL MITIGATION INFORMATION TO THE TREE | | | DISPOSITION SHEETS, SHOULD NOT BE ON THE LANDSCAPE | | | SHEETS. | | | ??? CORRECT BOTANICAL NAME FOR MAHOGANY IN THE ARBORIST | | | REPORT. | | | ??? TREES PROPOSED TO BE REMOVED WITH A CANOPY DIAMETER | | | OF 20 FEET OR MORE SHOULD HAVE THE MITIGATION SQUARE | | | FOOTAGE CALCULATED BASED ON THE ACTUAL DIAMETER. TREES | | | LESS THAN 20 FEET CANOPY DIAMETER AND PALMS SHOULD SHOW | | | THE CATEGORY MITIGATION DUE AS SQUARE FOOTAGE. | | | ??? PROVIDE THE TOTAL MITIGATION SQUARE FOOTAGE DUE | | | INCLUDING THE PALM MITIGATION. | | | ??? PROVIDE THE MITIGATION CREDITS BASED ON THE PLANT | | | LIST BY TREE CATEGORY AND PROVIDE A TOTAL SQUARE | | | FOOTAGE. | | | ??? CORRECT NOTE ON L1.2 ALL CANOPY MITIGATION MUST BE | | | PROVIDED ON SITE OR PAYMENT IN LIEU PAYMENT MADE TO THE | | | CANOPY MITIGATION FUND. | | | | | | 2. SECTION 94-448 (D)(3) REQUIRES NATIVE TREES AND | | | PALMS IN GOOD CONDITION TO BE PRESERVED ON SITE OR | | | RELOCATED. PROVIDE THE DETAILS OF THE CONDITION FOR | | | EACH NATIVE TREE OR PALM PROPOSED TO BE REMOVED IN THE | | | ARBORISTS REPORT AND EXPLAIN THE REASON FOR REMOVAL PER | | | SECTION 94-448. | | | | | | 3. PROVIDE INFORMATION ON WHAT HAPPENED TO THE KAPOK | | | TREE THAT WAS LOCATED ON THIS SITE. | | | | | | 4. THE LACK OF TREE CANOPY AND THE EXTENSIVE PAVED | | | AREAS IN THE DESIGN AROUND THE PROPOSED BUILDING IS | | | NOTED, THE HEAT ISLAND CREATED WILL NOT BE PEDESTRIAN | | | FRIENDLY. THERE IS A DEFICIT OF TREE CANOPY REPLACEMENT | | | | | | 5. THE BUFFER ALONG OLIVE NEEDS TO CONSIST OF TREES | | | APPROPRIATE UNDER THE POWER LINES TO PROVIDE SHADE FOR | | | THE SIDEWALK INSTEAD OF PALMS. | | | | | | 6. CORRECT THE FLORIDA FRIENDLY LANDSCAPE DESIGN | | | OPTIONS CHART TO ELIMINATE TAKING 51% IN TWICE IN THE | | | SAME OPTION. SEE (3)GROUNDCOVER, (4) SHRUBS, AND (5) | | | TREES. | | | | | | 7. SHOW LOCATIONS OF BACKFLOWS AND ADJUST LOCATIONS OF | | | UTILITY LINES TO RESOLVE CONFLICTS WITH EXISTING AND | | | PROPOSED TREES AND LANDSCAPING, AS THERE ARE MULTIPLE | | | CONFLICTS SHOWN. | | | | | | 8. SHOW COMPLIANCE WITH SECTION 94-445 L. PLANT | | | SPECIES. A MINIMUM OF 60 PERCENT OF PLANT MATERIAL | | | ADDED SHALL BE FLORIDA NATIVE OR DROUGHT TOLERANT | | | SPECIES SELECTED FROM THE CITY LIST OR THE LIST OF | | | SPECIES IN THE MOST RECENT EDITION OF SOUTH FLORIDA | | | WATER MANAGEMENT DISTRICT WATERWISE SOUTH FLORIDA | | | LANDSCAPES. PROVIDE ONE ACTUAL PERCENTAGE BASED ON THE | | | PLANT LIST. | | | | | | 9. PROVIDE SCREENING HEDGES FOR ALL GROUND MOUNTED | | | VALVES AND EQUIPMENT. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | | | | |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
2 |
Status |
P |
Date |
02-03-2023 |
|
|
Cont ID |
|
| Sent By |
jroach |
Date |
02-03-2023 |
Time |
14:17 |
Rev Time |
0.00 |
| Received By |
jroach |
Date |
02-03-2023 |
Time |
14:16 |
Sent To |
|
|
| Notes |
| 2023-02-03 14:17:19 | CONDITION OF APPROVAL: | | | | | | PURSUANT TO AN EMAIL FROM DAN GIUST, PARKING OPERATIONS | | | SUPERINTENDENT, THERE ARE 7 ON-STREE PARKING SPACES | | | THAT ARE BEING ELIMINATED AS A RESULT OF THE PROPOSED | | | ABANDONMENT AT A COST $24,000.00 PER SPACE FOR A TOTAL | | | OF $168,000.00. | | | | | | DANIEL GIUST / CPP | | | PARKING OPERATIONS SUPERINTENDENT | | | | | | CITY OF WEST PALM BEACH | | | PARKING ADMINISTRATION DEPARTMENT | | | 500 BANYAN STREET ??? WEST PALM BEACH ??? FLORIDA 33401 | | | P: 561.822.1494 WWW.WPB.ORG |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
F |
Date |
12-05-2022 |
|
|
Cont ID |
|
| Sent By |
jroach |
Date |
12-05-2022 |
Time |
11:30 |
Rev Time |
0.00 |
| Received By |
jroach |
Date |
12-05-2022 |
Time |
11:30 |
Sent To |
|
|
| Notes |
| 2022-12-05 11:32:48 | PURSUANT TO AN EMAIL FROM DAN GIUST, PARKING OPERATIONS | | | SUPERINTENDENT, THERE ARE 7 ON-STREE PARKING SPACES | | | THAT ARE BEING ELIMINATED AS A RESULT OF THE PROPOSED | | | ABANDONMENT AT A COST $24,000.00 PER SPACE FOR A TOTAL | | | OF $168,000.00. | | | | | | DANIEL GIUST / CPP | | | PARKING OPERATIONS SUPERINTENDENT | | | | | | CITY OF WEST PALM BEACH | | | PARKING ADMINISTRATION DEPARTMENT | | | 500 BANYAN STREET ??? WEST PALM BEACH ??? FLORIDA 33401 | | | P: 561.822.1494 WWW.WPB.ORG |
|
|
| Review Stop |
PU |
PUBLIC UTILITIES |
| Rev No |
2 |
Status |
F |
Date |
04-24-2023 |
|
|
Cont ID |
|
| Sent By |
relizond |
Date |
04-24-2023 |
Time |
15:21 |
Rev Time |
0.00 |
| Received By |
relizond |
Date |
04-24-2023 |
Time |
15:21 |
Sent To |
|
|
| Notes |
| 2023-04-24 15:21:04 | -COMMENT REGARDING EXISTING MANHOLES NEEDING REHABBING | | | NOT FULLY SATISFIED. PLEASE REVIEW PROPOSED PLANS AND | | | REVISE | | | -COMMENT REGARDING ONLY 8" LATERALS BEING ALLOWED | | | CONNECTION TO EXISTING MANHOLES NOT SATISFIED | | | -CLEANOUT ON PROPOSED SANITARY LATERAL IS 4" ON A 6" | | | LATERAL. | | | -CALL OUTS ARE NOT CLEAR ON DETAIL ON SHEET 5-1 | | | -PROVIDE DEMAND CALCULATIONS FOR BOTH EXISTING AND | | | PROPOSED CONDITIONS | | | -DOUBLE VALVING FOR NEW WATER MAIN REQUIRED AS PART OF | | | TESTING/SAMPLING PER CITY STANDARD DETAIL P-6 | | | -PROPOSED PROFILES ARE NOT SHOWING ALL EXISTING | | | CONFLICTS | | | -DEMO PLANS INCORRECTLY LISTING EXISTING 8" GATE VALVE | | | AND WATER MAIN ON GRUBER PLACE AS CAST IRON |
|
|
| Review Stop |
PU |
PUBLIC UTILITIES |
| Rev No |
1 |
Status |
F |
Date |
03-13-2023 |
|
|
Cont ID |
|
| Sent By |
relizond |
Date |
03-13-2023 |
Time |
11:44 |
Rev Time |
0.00 |
| Received By |
relizond |
Date |
03-13-2023 |
Time |
11:24 |
Sent To |
|
|
| Notes |
| 2023-03-13 11:43:48 | DEMOLITION PLAN | | | -WHAT IS HAPPENING TO THE LATERAL CONNECTED TO THE | | | EXISTING MANHOLE TO THE WEST? | | | -CALL OUY SIZES ADN MATERIAL OF LINES BEING REMOVED | | | -DENOTE ALL LINES THAT ARE PRIVATE | | | -SEWER "VALVES" SHOWN ARE LIKELY CLEANOUTS, PLEASE | | | CONFIRM AND REVISE AS NECESSARY. | | | -SHOW ALL EXISITNG UTILITY EASEMENTS | | | -NO LEGEND PROVIDED | | | | | | UTILTY PLAN | | | -REPLACE 4" WATER MAIN ON GRUBER PLACE UP TO DIXIE (TO | | | EXISTING 8" DIP) | | | -EXISTING SEWER MANHOLES WITH PROPOSED CONNECTIONS WILL | | | REQUIRE THE MANHOLE BE REHABBED | | | -RECORDS SHOW A FIRE HYDRANT ALREADY EXISTING IN THE | | | PROPOSED AREA. SHOW REMOVAL/REPLACEMENT ON DEMO PLANS | | | IF THAT WORK IS BEING PROPOSED | | | -GIVE REASONING FOR PROPOSED MANHOLE INSTALLATION FOR | | | NEW SEWER SYSTEM AS OPPOSED TO CONNECTING TO EXISTING | | | MANHOLE(S) | | | -ONLY 8" SEWER LATERALS ARE CALLED FOR CONNECTION TO A | | | MANHOLE. PLEASE REVISE TO SHOW THE PROPOSED LATERAL | | | MAKING CONNECTION TO THE SEWER MAIN | | | -PROVIDE PROFILES FOR BOTH WATER AND SEWER MAIN | | | INSTALLATIONS TO EXHIBIT CLEARANCE FOR CROSSINGS/COVER. | | | -PROVIDE A POINT OF SERVICE VALVE FOR THE PROPOSED FIRE | | | LINE | | | | | | |
|
|
| Review Stop |
PU-CS |
PUBLIC UTILITIES CUSTOMER SRVC |
| Rev No |
3 |
Status |
P |
Date |
03-03-2023 |
|
|
Cont ID |
|
| Sent By |
mhurley |
Date |
03-03-2023 |
Time |
07:37 |
Rev Time |
0.00 |
| Received By |
mhurley |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2023-03-03 07:37:36 | AT ENGINEERING DEVELOPMENT SUBMITTAL, SHOW RELOCATED | | | POLES AND TRANSFORMERS ON CIVIL PLANS. POLES AND | | | TRANSFORMERS SHALL BE DISTANCED AWAY FROM WPB UTILITIES | | | INFRASTRUCTURE. |
|
|
| Review Stop |
PU-CS |
PUBLIC UTILITIES CUSTOMER SRVC |
| Rev No |
2 |
Status |
F |
Date |
01-04-2023 |
|
|
Cont ID |
|
| Sent By |
mhurley |
Date |
01-04-2023 |
Time |
16:30 |
Rev Time |
0.00 |
| Received By |
mhurley |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2023-01-04 16:29:51 | PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING: | | | -AT FORMAL ENGINEERING SUBMITTAL: SPELL OUT PUE OR ADD | | | TO ABBREVIATION LIST, CHECK INVERTS OF PROPOSED | | | SANITARY MANHOLE 2, REMOVE PALM BEACH COUNTY UTILITY | | | STANDARD DETAILS AND REPLACE WITH WEST PALM BEACH | | | UTILITIES STANDARD DETAILS, AND LOOK BACK AT REVIEW | | | COMMENT NUMBER 2 AS IT DID NOT SEEM RESOLVED. | | | -CITY SANITARY SEWER LATERALS ARE TYPICALLY MINIMUM 6 | | | INCH SIZE IN OUR SERVICE AREA. | | | -SANITARY SEWER DESIGN MAY NEED TO BE REVISED AT FORMAL | | | ENGINEERING SUBMITTAL PER WPB STANDARD DETAIL GS3 NOTE | | | 2. | | | -FOOTPRINT OF ABOVE-GROUND METERED WATER SERVICE MAY | | | STILL BE BIGGER THAN DEPICTED. | | | -REMINDER TO FOLLOWUP ON THIS: 19. SHOW AND LABEL THE | | | RELOCATED POLES AND OVERHEAD UTILITIES. ALSO SHOW ANY | | | TRANSFORMER PADS. RESPONSE: AWAITING INFORMATION FROM | | | FPL TO PROVIDE A SCHEMATIC OF POLE AND TRANSFORMER | | | LOCATIONS. | | | RESPECTFULLY, | | | MARK HURLEY [email protected] |
|
|
| Review Stop |
PU-CS |
PUBLIC UTILITIES CUSTOMER SRVC |
| Rev No |
1 |
Status |
F |
Date |
11-08-2022 |
|
|
Cont ID |
|
| Sent By |
mhurley |
Date |
11-08-2022 |
Time |
09:16 |
Rev Time |
0.00 |
| Received By |
mhurley |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-11-08 09:15:28 | PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING: | | | -ON CIVIL PLANS, LABEL EXISTING WATER MAINS WITH PIPE | | | SIZE AND MATERIAL TYPE. INCLUDE THAT INFO ON DEMO PLAN | | | SHEET. | | | -DEMO PLAN SHOWS WATER LINE RUNNING WEST FROM PROPOSED | | | ABANDONED WATER MAIN. CALLOUT WHAT IS HAPPENING TO THAT | | | WATER LINE, AND VERIFY WILL NOT LEAVE ATHLETIC BUILDING | | | OUT OF SERVICE. | | | -UPON FURTHER REVIEW, APPLICANT MAY BE REQUIRED TO | | | REMOVE EXISTING WATER SERVICES FURTHER BACK TO THE | | | WATER MAIN THAN PROPOSED. | | | -UPON FURTHER REVIEW, APPLICANT MAY BE REQUIRED TO | | | REMOVE WATER MAINS RATHER THAN ABANDON THEM. | | | -UPON FURTHER REVIEW, APPLICANT MAY BE REQUIRED TO | | | REMOVE EXISTING SEWER LATERALS RATHER THAN ABANDOM | | | THEM. | | | -CLEARLY SHOW AND LABEL ALL EXISTING AND PROPOSED WATER | | | MAIN VALVES. | | | -FIRE HYDRANT APPEARS TO BE TOO CLOSE TO TREE. CHECK | | | CLEARANCE REQUIREMENT ON FIRE HYDRANT STANDARD DETAIL. | | | -FIRE HYDRANT TYPICALLY HAS 6 INCH PIPE. | | | -ADD SIZE OF FIRELINE BACKFLOW ASSEMBLY TO LABEL. | | | -ADD SIZE AND RP TYPE TO LABEL OF PROPOSED DOMESTIC | | | BACKFLOW ASSEMBLY. | | | -ADD SIZE TO LABELS OF PROPOSED WATER METERS. METERS 3 | | | INCHES OR LARGER SHOULD BE INSTALLED ABOVE-GROUND. | | | -IF WATER METER WILL BE 3 INCH OR LARGER, ENSURE THAT | | | THE FOOTPRINT SIZE IS MORE ACCURATELY DEPICTED ON CIVIL | | | PLANS. | | | -THERE SUCH NOT BE A 3 INCH WATER SERVICE. 2 INCH WATER | | | METERS HAVE 2 INCH WATER SERVICE PIPE WHILE 3 AND 4 | | | INCH METERS HAVE 4 INCH WATER SERVICE PIPE. ALSO ADD | | | PIPE MATERIAL TYPE TO LABEL. | | | -UTILITY PLAN SHOWS EXISTING WATER SERVICE AND TAP IN | | | CLOSE PROXIMITY TO PROPOSED DOMESTIC WATER SERVICE. | | | PLEASE PROVIDE ADEQUATE CLEARANCE DISTANCE BETWEEN | | | TAPS. | | | -CIVIL PLANS DO NOT SHOW PAVEMENT RESTORATION | | | BOUNDARIES ON OLIVE AVE FOR UTILITY WORK BEING DONE IN | | | THE ROADWAY. REFERENCE STANDARD DETAIL GC8 NOTE 1. | | | -ARE ANY METERED IRRIGATION WATER SERVICES NEEDED? | | | -ON DEMO PLAN, SHOW AND LABEL EXISTING WATER PIPE AND | | | TEE FOR FIRE HYDRANT THAT IS PROPOSED TO BE REMOVED. | | | -IF THERE WILL BE AN OUTDOOR GREASE TRAP THEN SHOW AND | | | LABEL ON PLANS. | | | -SHOW AND LABEL THE RELOCATED POLES AND OVERHEAD | | | UTILITIES. ALSO SHOW ANY TRANSFORMER PADS. | | | RESPECTFULLY, | | | MARK HURLEY [email protected] |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
3 |
Status |
P |
Date |
03-15-2023 |
|
|
Cont ID |
|
| Sent By |
|
Date |
03-15-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
03-15-2023 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
2 |
Status |
P |
Date |
01-03-2023 |
|
|
Cont ID |
|
| Sent By |
|
Date |
01-03-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
01-03-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-01-03 14:33:27 | NO FURTHER COMMENTS. | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
F |
Date |
12-05-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
12-05-2022 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
12-05-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-12-05 11:48:47 | | | | PLEASE PROVIDE THE FOLLOWINGS: | | | 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID | | | WASTE VOLUME PRODUCED ALONG WITH THE SIZE, TYPE AND | | | QUANTITY OF THE CONTAINER (I.E. DUMPSTER/COMPACTOR) | | | THAT WILL BE UTILIZED FOR THE SANITATION SERVICE. | | | 2- DUMPSTER ENCLOSURE DETAIL. DETAILS FOR SANITATION | | | SERVICE (I.E. SOLID WASTE CONTAINER(S) TYPE, COLLECTION | | | LOCATION, ETC.). FOR A FREESTANDING SITE DUMPSTER | | | ENCLOSURE, THE ENCLOSURE SHALL COMPLY WITH THE LATEST | | | REVISION OF CITY OF WEST PALM BEACH GENERAL | | | CONSTRUCTION-GARBAGE ENCLOSURE STANDARD, GC-7. (LINK TO | | | THE LATEST REVISION OF THE GC-7 DOCUMENT: HTTPS://WWW.W | | | PB.ORG/HOME/SHOWPUBLISHEDDOCUMENT/3690/6376290604221000 | | | 00) | | | 3- AUTOTURN EXHIBIT WITH DYNAMIC ENVELOPE AND THE | | | VEHICLE???S WHEEL PATH IDENTIFIED WITH DIFFERENT COLORS | | | FOR THE SANITATION SERVICE, FRONT LOADER TRUCK WITH THE | | | FOLLOWING SPECS: | | | - DUAL AXLES | | | - TRUCK LENGTH: 35 FT | | | - TRUCK WIDTH: 11 FT | | | - TURNING RADIUS: | | | - SAE TURNING RADIUS: 32.5 FT | | | - CURB-TO-CURB DIAMETER: 74 FT | | | - WALL-TO-WALL DIAMETER: 86.3 FT | | | 4- OWNERS AND/OR OCCUPANTS OF PROPERTY THAT REQUIRE | | | GREASE HAULING SERVICES SHALL ENSURE THAT THEIR GREASE | | | TANKS OR CONTAINERS REMAIN CLEAN, AND ARE ENCLOSED AND | | | NOT IN PUBLIC VIEW. | | | 5- IN CASE OF PROPOSING ADDITION OF ANY NEW CAN(S) IN | | | THE CITY`S RIGHT-OF-WAY , THE LOCATION AND QUANTITY OF | | | THE CAN(S) SHALL BE REVIEWED AND APPROVED BY PUBLIC | | | WORKS DEPARTMENT AND THE CAN(S) SHALL BE TYPE, SIZE AND | | | COLOR APPROVED BY PUBLIC WORKS DEPARTMENT. THE BUILDING | | | MAINTENANCE IS RESPONSIBLE TO MAINTAIN AND SERVICE THE | | | CAN(S). | | | 6- ALL THE PARKING STALL PAINTING SHALL COMPLY WITH THE | | | CITY`S MUNICIPAL CODE SECTION 94-485 AND FLORIDA | | | STATUES [553.5041 F.S.]. | | | 7- SIGNAGE PLAN. ALL STRIPING AND SIGNAGE SHALL COMPLY | | | WITH THE LATEST CITY OF WEST PALM BEACH STANDARD | | | DETAILS AND MEET THE M.U.T.C.D. LATEST EDITION. | | | 8- ALL PAVEMENT MARKING , SIGNING AND SIDEWALK DAMAGED | | | DURING CONSTRUCTION SHALL BE RESTORED. | | | | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
4 |
Status |
P |
Date |
04-24-2023 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
04-24-2023 |
Time |
16:35 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
04-24-2023 |
Time |
17:12 |
Sent To |
|
|
| Notes |
| 2023-04-24 17:04:08 | CONDITIONS FOR SITE PLAN APPROVAL: | | | 1. PDG AND UTILITY PLANS SUBMITTED FOR ENGINEERRING | | | PERMIT SHALL HAVE ALL UTILITY PIPES WITHIN THE R/W | | | LABELED WITH SIZE AND MATERIAL. EXISTING PIPE INVERTS | | | SHALL BE PROVIDED AT DRAINAGE AND SANITARY SEWER | | | STRUCTURES. | | | | | | 2. THE EOR WILL NEED TO JUSTIFY THE PIPE SIZE FOR ALL | | | STORM PIPES LARGER THAN 15" AND CONNECTING TO THE | | | CITY'S MS4. BASED ON THE CURRENT DESIGN, THIS WOULD | | | APPLY TO THE PROPOSED 30" DIAMETER RCP PIPE BETWEEN | | | CB-1 AND EX. STORM MH #8. | | | | | | 3. PBAU WILL BE RESPONSIBLE TO MAINTAIN THE DRAIANGE | | | SYSTEM PIPES AND STRUCTURES WITHIN THE PUBLIC R/W | | | UPSTREAM OF THE CONTROL STRUCTURE CB-1. A MAINTENANCE | | | AGREEMENT MAY NEED TO BE PROVIDED TO THE CITY. | | | | | | | | | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 3/24/2023 SUBMITTAL. PREVIOUSLY SATISFIED COMMENTS WERE | | | REMOVED. | | | | | | 1. [PARTIALLY SATISFIED] LABEL EXISTING UTILITIES (SIZE | | | AND MATERIAL). ADDITIONAL COMMENTS - SEE CONDITIONAL | | | APPROVAL NOTE #1 ABOVE. | | | | | | 2. [PARTIALLY SATISFIED] PARKING STRIPING DETAIL (ON | | | SHEET C3.1) DOES NOT MEET CITY CODE (SECTION 94-485). | | | ADD'L COMMENT - DETAIL IS MISSING THE 4" X 12" | | | CONNECTOR STRIPE AT THE ENDS OF THE PARALLEL STRIPES. | | | SHOW CORRECT PARKING LOT STRIPING ON THE ENGINEERING | | | PERMIT SUBMITTAL. | | | | | | 3. [SATISFIED] SHOW COMPLETE REMOVAL OF STORM PIPE | | | BETWEEN STORM MH#2 AND STORM MH #4. ADDITIONAL COMMENT: | | | MEET WITH PUBLIC UTILITIES DURING AFTER SITE PLAN | | | APPROVAL TO DETERMINE THE LIMITS OF THE STORM PIPE | | | REMOVAL/ABANDONMENT DUE TO THE SANITARY SEWER CROSSING. | | | | | | 4. [SATISFIED] REMOVE STORM MH #3 AND THE PIPE BETWEEN | | | STORM MH #3 AND CURB INLET #4. | | | | | | 6. [NOT SATISFIED] JUSTIFY THE PROPOSED STORM PIPE | | | SIZES THAT WILL BE CONNECTING TO THE CITY'S STORM | | | DRAINAGE SYSTEM WITH ENGINEERING PERMIT SUBMITTAL. SEE | | | CONDITIONAL APPROVAL #2 ABOVE. | | | | | | 7. [PARTIALLY SATISFIED] EXISTING DRAINAGE STRUCTURES | | | TO BE CHECKED TO SEE IF THEY ARE LARGE ENOUGH FOR | | | PROPOSED DRAINAGE PIPE CONNECTIONS. ADD'L COMMENT - EX. | | | MH #8 SHOWS WEST PPE CHANGING FROM 10" TO 30". THE 30" | | | PIPE TO BE VALIDATED PER COMMENT #6. | | | | | | 9. [SATISFIED] FDOT SPECIAL TYPE "F" CURB AND GUTTER | | | SHALL BE CONSTRUCTED ALONG S. OLIVE AVE. | | | | | | 13. [SATISFIED] SECTION C-C: | | | A. LABEL S. OLIVE R/W | | | B. LABEL THE SPECIAL TYPE "F" CURB AND GUTTER | | | C. LABEL THE HEADER CURB(?) ALONG THE EDGE OF THE | | | PAVER SIDEWALK. NOTE THE HEADER CURB IS NOT SHOWN ON | | | THE PGD PLAN. | | | | | | 14. [SATISFIED] SECTION D-D: | | | A. INDICATE SUPERPAVE ASPHALT WITHIN THE R/W. | | | B. LABEL THE R/W (WALLINGFORD PLACE). | | | C. MAINTENANCE AGREEMENT TO BE NEEDED FOR THE PAVER | | | SIDEWALK. | | | | | | NEW COMMENTS (2/24/2023 SUBMITTAL) | | | 15. [SATISFIED] LIST VERTICAL DATUM REFERENCE AND | | | CONVERSION EQUATION TO NGVD1929 ON EVERY SHEET WITH | | | ELEVATION INFORMATION. INFORMATION IS MISSING ON SHEETS | | | C4.2 | | | | | | 16. [SATISFIED] LABEL THE CONTROL STRUCTURE ON THE PGD | | | PLAN. PROVIDE A DETAIL WITH THE ENGINEERING PERMIT | | | SUBMITTAL. NOTE THE CITY DOES NOT ALLOW THE USE OF | | | BLEEDERS WITH EXFILTRATION TRENCHES. ADD'L COMMENT: ADD | | | THE WEIR ELEVATION TO THE PDG PLAN. PRB WILL BE NEEDED | | | OVER THE WEST PIPE. | | | | | | 17. [SATISFIED] INDICATE ON THE DEMOLITION PLAN IF THE | | | STORM PIPE SOUTH OF CURB INLET #1 IS TO REMAIN OR BE | | | REMOVED. PGD PLAN CALLS OUT 46 LF OF 24-INCH RCP. | | | | | | 18. [SATISFIED] CURB RAMPS ARE TO BE BROUGHT UP TO | | | CURRENT ADA STANDARDS IF THE ASPHALT ADJACENT TO THE | | | CURB RAMP IS MODIFIED (INCLUDING MILLING AND | | | RESURFACING). REVIEW THE CURB RAMPS ON OPPOSITE SIDES | | | OF THE STREETS TO DETERMINE IF THE RAMPS CURRENTLY MEET | | | ADA REQUIREMENTS. INDICATE ON SHEET C3.0, SITE | | | GEOMETRY, MARKING AND SIGNAGE PLAN. | | | | | | 19. [SATISFIED] SFWMD REQUIRES LONG-TERM MAINTENANCE | | | CONTRACT BE IN PLACE FOR PERVIOUS PAVERS TO BE | | | CONSIDERED PERVIOUS SURFACES IN THE STORMWATER | | | MANAGEMENT ANALYSIS. ADD'L COMMENT - PERVIOUS PAVERS NO | | | LONGER PROPOSED. | | | | | | 20 [PARTIALLY SATISFIED] APPLICANT TO BE RESPONSIBLE | | | FOR MAINTAINING DRAINAGE SYSTEM FROM PROPOSED CB #11 TO | | | THE CONNECTION TO EXISTING MH #8, INCLUDING THE STORM | | | PIPES BETWEEN PROPOSED CURB INLET #9 AND PROPOSED CURB | | | INLET #7. ADD'L COMMENT - REMOVE "PRIVATE" FROM THE | | | STORM PIPE LABELS FOR DRAINAGE PIPES WITHIN THE RIGHT | | | OF WAY. PBAU WIL NEED TO ENTER INTO A MAINTENANCE | | | AGREEMENT WITH THE CITY FOR PBAU TO BE RESPONSIBLE TO | | | MAINTAIN THE STORM PIPE AND STRUCTURES WITHIN THE R/W. | | | LIMITS OF MAINTENANCE TO BE INDICATED IN THE AGREEMENT. | | | SEE SITE PLAN CONNDTION #3 ABOVE. | | | | | | 21. [SATISFIED] THE SITE PLAN SHOWS A DROP OFF AREA | | | SOUTH OF THE BUILDING IN THE CIRCLE DRIVE PULL UP. | | | ADVISE IF THE SIDEWALK ADJACENT TO THE DROP OFF AREA IS | | | TO BE FLUSH WITH THE PAVEMENT FOR ADA ACCESSIBILITY. | | | REVISE SECTION B-B ACCORDINGLY. | | | | | | NEW COMMENTS (3/4/2023 SUBMITAL) | | | 22. S. DIXIE HWY IS MAINTAINED BY FDOT. ANY | | | IMPROVEMENTS WITHIN THE R/W WILL NEED A PERMIT FROM | | | FDOT. | | | | | | 23. PROP. MH-3 IS MIISING THE INVERT ELEVATION FOR THE | | | EXISTING WEST PIPE. SHOW ON THE ENGINEERING PERMIT | | | SUBMTITAL. | | | | | | 24. INCLUDE A DETAIL OF THE SPECIAL FDOT TYPE F CURB | | | AND GUTTER ON THE ENGINEERING PLAN SUBMITTAL. CONTACT | | | REVIEWER FOR INFORMATION. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | [email protected] | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
3 |
Status |
F |
Date |
03-13-2023 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
03-13-2023 |
Time |
17:54 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
03-13-2023 |
Time |
17:55 |
Sent To |
|
|
| Notes |
| 2023-03-13 17:55:18 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 2/24/2023 SUBMITTAL: | | | | | | 1. [PARTIALLY SATISFIED] LABEL EXISTING UTILITIES (SIZE | | | AND MATERIAL). | | | | | | 2. [NOT SATISFIED] PARKING STRIPING DETAIL (ON SHEET | | | C3.1) DOES NOT MEET CITY CODE (SECTION 94-485). | | | | | | 3. [NOT SATISFIED] SHOW COMPLETE REMOVAL OF STORM PIPE | | | BETWEEN STORM MH#2 AND STORM MH #4. ADDITIONAL COMMENT: | | | MEET WITH PUBLIC UTILITIES DURING AFTER SITE PLAN | | | APPROVAL TO DETERMINE THE LIMITS OF THE STORM PIPE | | | REMOVAL/ABANDONMENT DUE TO THE SANITARY SEWER CROSSING. | | | | | | 4. [NOT SATISFIED] REMOVE STORM MH #3 AND THE PIPE | | | BETWEEN STORM MH #3 AND CURB INLET #4. | | | | | | 5. [SATISFIED] WHAT IS HAPPENING TO THE STORM PIPE | | | BETWEEN CURB INLET #2 AND STORM MH #1 - TO BE REMOVED | | | OR TO REMAIN? | | | | | | 6. [NOT SATISFIED] JUSTIFY THE PROPOSED STORM PIPE | | | SIZES THAT WILL BE CONNECTING TO THE CITY'S STORM | | | DRAINAGE SYSTEM WITH ENGINEERING PERMIT SUBMITTAL. | | | | | | 7. [NOT SATISFIED] EXISTING DRAINAGE STRUCTURES TO BE | | | CHECKED TO SEE IF THEY ARE LARGE ENOUGH FOR PROPOSED | | | DRAINAGE PIPE CONNECTIONS. | | | | | | 8. [SATISFIED] WHERE WILL PROPOSED STORM MH #5 DRAIN | | | TO? EXISTING STORM PIPE TO THE SOUTH IS SHOWN TO BE | | | REMOVED. | | | | | | 9. [NOT SATISFIED] FDOT SPECIAL TYPE "F" CURB AND | | | GUTTER SHALL BE CONSTRUCTED ALONG S. OLIVE AVE. | | | | | | 10. [SATISFIED] PROVIDE PROPOSED FINISHED FLOOR | | | ELEVATION. | | | | | | 11. [SATISFIED] REVIEW INVERTS OF SEWER AND STORM | | | PIPES. THERE APPEARS TO BE A CONFLICT EAST OF PROPOSED | | | CATCH BASIN #11. | | | | | | 12. [SATISFIED] AVOID RUNNING THE STORM PIPE UNDER THE | | | CIRCULAR LANDSCAPE AREA SOUTH OF THE BUILDING, | | | | | | 13. [NOT SATISFIED] SECTION C-C: | | | A. LABEL S. OLIVE R/W | | | B. LABEL THE SPECIAL TYPE "F" CURB AND GUTTER | | | C. LABEL THE HEADER CURB(?) ALONG THE EDGE OF THE | | | PAVER SIDEWALK. NOTE THE HEADER CURB IS NOT SHOWN ON | | | THE PGD PLAN. | | | | | | 14. [NOT SATISFIED] SECTION D-D: | | | A. INDICATE SUPERPAVE ASPHALT WITHIN THE R/W. | | | B. LABEL THE R/W (WALLINGFORD PLACE). | | | C. MAINTENANCE AGREEMENT TO BE NEEDED FOR THE PAVER | | | SIDEWALK. | | | | | | NEW COMMENTS (2/24/2023 SUBMITTAL) | | | 15. LIST VERTICAL DATUM REFERENCE AND CONVERSION | | | EQUATION TO NGVD1929 ON EVERY SHEET WITH ELEVATION | | | INFORMATION. INFORMATION IS MISSING ON SHEETS C4.2 | | | | | | 16. LABEL THE CONTROL STRUCTURE ON THE PGD PLAN. | | | PROVIDE A DETAIL WITH THE ENGINEERING PERMIT SUBMITTAL. | | | NOTE THE CITY DOES NOT ALLOW THE USE OF BLEEDERS WITH | | | EXFILTRATION TRENCHES. | | | | | | 17. INDICATE ON THE DEMOLITION PLAN IF THE STORM PIPE | | | SOUTH OF CURB INLET #1 IS TO REMAIN OR BE REMOVED. PGD | | | PLAN CALLS OUT 46 LF OF 24-INCH RCP. | | | | | | 18. CURB RAMPS ARE TO BE BROUGHT UP TO CURRENT ADA | | | STANDARDS IF THE ASPHALT ADJACENT TO THE CURB RAMP IS | | | MODIFIED (INCLUDING MILLING AND RESURFACING). REVIEW | | | THE CURB RAMPS ON OPPOSITE SIDES OF THE STREETS TO | | | DETERMINE IF THE RAMPS CURRENTLY MEET ADA REQUIREMENTS. | | | INDICATE ON SHEET C3.0, SITE GEOMETRY, MARKING AND | | | SIGNAGE PLAN. | | | | | | 19. SFWMD REQUIRES LONG-TERM MAINTENANCE CONTRACT BE IN | | | PLACE FOR PERVIOUS PAVERS TO BE CONSIDERED PERVIOUS | | | SURFACES IN THE STORMWATER MANAGEMENT ANALYSIS. | | | | | | 20 APPLICANT TO BE RESPONSIBLE FOR MAINTAINING DRAINAGE | | | SYSTEM FROM PROPOSED CB #11 TO THE CONNECTION TO | | | EXISTING MH #8, INCLUDING THE STORM PIPES BETWEEN | | | PROPOSED CURB INLET #9 AND PROPOSED CURB INLET #7. | | | | | | 21. THE SITE PLAN SHOWS A DROP OFF AREA SOUTH OF THE | | | BUILDING IN THE CIRCLE DRIVE PULL UP. ADVISE IF THE | | | SIDEWALK ADJACENT TO THE DROP OFF AREA IS TO BE FLUSH | | | WITH THE PAVEMENT FOR ADA ACCESSIBILITY. REVISE SECTION | | | B-B ACCORDINGLY. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | [email protected] | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
11-13-2022 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
11-13-2022 |
Time |
09:14 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
11-13-2022 |
Time |
09:26 |
Sent To |
|
|
| Notes |
| 2022-11-13 09:25:57 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. LABEL EXISTING UTILITIES (SIZE AND MATERIAL). | | | | | | 2. PARKING STRIPING DETAIL DOES NOT MEET CITY CODE. | | | | | | 3. SHOW COMPLETE REMOVAL OF STORM PIPE BETWEEN STORM | | | MH#2 AND STORM MH #4. | | | | | | 4. REMOVE STORM MH #3 AND THE PIPE BETWEEN STORM MH #3 | | | AND CURB INLET #4. | | | | | | 5. WHAT IS HAPPENING TO THE STORM PIPE BETWEEN CURB | | | INLET #2 AND STORM MH #1 - TO BE REMOVED OR TO REMAIN? | | | | | | 6. JUSTIFY THE PROPOSED STORM PIPE SIZES THAT WILL BE | | | CONNECTING TO THE CITY'S STORM DRAINAGE SYSTEM WITH | | | ENGINEERING PERMIT SUBMITTAL. | | | | | | 7. EXISTING DRAINAGE STRUCTURES TO BE CHECKED TO SEE IF | | | THEY ARE LARGE ENOUGH FOR PROPOSED DRAINAGE PIPE | | | CONNECTIONS. | | | | | | 8. WHERE WILL PROPOSED STORM MH #5 DRAIN TO? EXISTING | | | STORM PIPE TO THE SOUTH IS SHOWN TO BE REMOVED. | | | | | | 9. FDOT SPECIAL TYPE "F" CURB AND GUTTER SHALL BE | | | CONSTRUCTED ALONG S. OLIVE AVE. | | | | | | 10. PROVIDE PROPOSED FINISHED FLOOR ELEVATION. | | | | | | 11. REVIEW INVERTS OF SEWER AND STORM PIPES. THERE | | | APPEARS TO BE A CONFLICT EAST OF PROPOSED CATCH BASIN | | | #11. | | | | | | 12. AVOID RUNNING THE STORM PIPE UNDER THE CIRCULAR | | | LANDSCAPE AREA SOUTH OF THE BUILDING, | | | | | | 13. SECTION C-C: | | | A. LABEL S. OLIVE R/W | | | B. LABEL THE SPECIAL TYPE "F" CURB AND GUTTER | | | C. LABEL THE HEADER CURB(?) ALONG THE EDGE OF THE | | | PAVER SIDEWALK. NOTE THE HEADER CURB IS NOT SHOWN ON | | | THE PGD PLAN. | | | | | | 14. SECTION D-D: | | | A. INDICATE SUPERPAVE ASPHALT WITHIN THE R/W. | | | B. LABEL THE R/W (WALLINGFORD PLACE). | | | C. MAINTENANCE AGREEMENT TO BE NEEDED FOR THE PAVER | | | SIDEWALK. | | | | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP | | | CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH | | | THE ENGINEERING PERMIT SUBMITTAL. CONSIDER LOW IMPACT | | | DEVELOPMENT IN THE DESIGN OF THE DRAINAGE SYSTEM. | | | | | | 2. PROVIDE COPY OF SFWMD ERP PERMIT BEFORE START OF | | | CONSTRUCTION. | | | | | | 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE | | | ENGINEERING PERMIT SUBMITTAL. | | | | | | | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | [email protected] | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
P |
Date |
02-01-2023 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
02-01-2023 |
Time |
13:50 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2023-02-01 13:54:31 | CONDITIONS OF APPROVAL: | | | | | | 1. REPLAT PRIOR TO C.O. | | | 2. MAINTENANCE AGREEMENT FOR ANY IMPROVEMENTS WITHIN | | | R/W. | | | 3. ENGINEERING DEVELOPMENT PERMIT WILL BE REQUIRED. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
11-08-2022 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
11-08-2022 |
Time |
10:14 |
Rev Time |
|
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-11-08 10:43:38 | 1. REPLAT WILL BE REQUIRED. | | | 2. AS SANITARY SERVES ONLY THE SCHOOL PROPERTY, IT WILL | | | BE A PRIVATE SYSTEM. NO PUBLIC UTILITY EASEMENT | | | REQUIRED. POINT OF SERVICE SHOULD BE NEW MANHOLE JUST | | | INSIDE PROPERTY AT S. OLIVE. | | | 3. UTILITIES MAY WANT LANDSCAPING RELOCATED FROM UE | | | CROSSING ROUNDABOUT MEDIAN. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
3 |
Status |
P |
Date |
03-15-2023 |
|
|
Cont ID |
|
| Sent By |
|
Date |
03-15-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
03-15-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-03-15 10:16:49 | TRAFFIC COMMENTS | | | 1) SATISFIED. SETUP A TRAFFIC ANALYSIS METHODOLOGY | | | MEETING | | | 2) SATISFIED. PROVIDE A FULL DETAILED TRAFFIC STUDY. | | | PER OTHER COMMENTS, THE ANALYSIS MAY NEED REVISION OR | | | INCLUSION OF FURTHER ITEMS | | | 3) SATISFIED. PROVIDE COUNTY TPS LETTER | | | 4) PARTIALLY SATISFIED. PROVIDE A PARKING MANAGEMENT | | | PLAN. PLEASE PROVIDE DOCUMENTATION PERTAINING THE | | | AGREEMENTS FOR THE CROSS-PARKING FACILITIES NOT OWNED | | | BY PBAU AND OUTSIDE OF THE CSPD; SPECIFICALLY, A | | | STATEMENT OR ACKNOWLEDGEMENT BY EACH FACILITY OWNER(S) | | | THAT CONFIRMS AVAILABILITY OF EXTRA PARKING CAPACITY AT | | | THEIR FACILITIES TO ACCOMMODATE PBAU DEMAND | | | 5) TO BE SATISFIED BEFORE BUILDING PERMIT APPLICATION. | | | PROVIDE A CONSTRUCTION MANAGEMENT PLAN. PLEASE REFER TO | | | CITY CODE 86-246 FOR DETAILS. THIS ITEM WILL BE | | | INCLUDED IN THE CONDITIONAL APPROVAL | | | 6) PARTIALLY SATISFIED. DEPENDING ON THE OUTCOME OF THE | | | TRAFFIC ANALYSIS, TRANSPORTATION DEMAND MANAGEMENT | | | (TDM) MEASURES MAY BE ENCOURAGED. TO BE FURTHER | | | DISCUSSED AND/OR CONDITIONALLY APPROVED, AND INCLUDED | | | IN THE ANALYSIS | | | SITE COMMENTS | | | 7) SATISFIED. PROVIDE A TRANSPORTATION SPECIFIC SITE | | | PLAN FOR THE GROUND FLOOR. SHOWCASING TRANSPORTATION | | | RELATED FEATURES (E.G. ROADWAY WIDTHS, DRIVING AISLES, | | | PARKING STALLS, SIDEWALK, CURB, GUTTER, DRIVEWAY, | | | GATES, CROSSWALKS, VISIBILITY TRIANGLE, CORNER & | | | DRIVEWAY SEPARATION DISTANCES, SLOPES, ETC.) PROPERLY | | | LABELED AND DIMENSIONED. THE SITE PLAN SHOULD BE NAMED | | | T-1.0. LATEST SUBMISSION PROVIDES VERY FEW OF THE | | | REQUESTED ITEMS IN THIS COMMENT, ALL DIMENSIONS AND | | | PROPOSED SITE FEATURES ARE MISSING | | | 8) SATISFIED. THE TRANSPORTATION SITE PLAN SHOULD | | | INCLUDE DIXIE HIGHWAY AND ACACIA RD AS THE WESTERN AND | | | SOUTHERN BOUNDARIES, RESPECTIVELY | | | 9) SATISFIED. IN THE T-1.0 SITE PLAN, PLEASE SHOWCASE | | | BASIC CURB DETAILS (E.G. DRIVEWAY, CURB CUTS, PAVEMENT | | | MARKINGS, PARKING STALLS, ETC.) ON THE OPPOSITE SIDE OF | | | THE ROADS SURROUNDING THE PROPOSED DEVELOPMENT. DETAILS | | | MUST BE DRAWN, PLEASE COMPLETE THE T-1 SHEET | | | ACCORDINGLY | | | 10) SATISFIED. PROVIDE A SIGNAGE AND PAVEMENT MARKING | | | PLAN. INCLUSIVE OF ALL FEATURES WITHIN THE PROPOSED | | | DEVELOPMENT AND ALONG ALL ROADS FRONTING THE SITE. SUCH | | | PLAN COULD BE INCORPORATED IN THE TRANSPORTATION SITE | | | ONE. PLEASE PROVIDE THE SPECIFIC CIVIL SHEET | | | NAME/NUMBER OR INCLUDE IN THE T-1.0 PLAN. | | | 11) SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE | | | TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND OUT OF THE | | | PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES AND | | | WHEEL PATHS CLEARLY DISTINCT AND DEFINED IN DIFFERENT | | | COLORS | | | 12) SATISFIED. PROVIDE ENGINEERING REFERENCE AND SPECS | | | SHEETS FOR EACH OF THE PROPOSED TRANSPORTATION FEATURES | | | (E.G. CURB, RAMP, GATE, SIGNAGE, PAVEMENT MARKING, | | | SIGNAL, ETC.) | | | 13) SATISFIED. IDENTIFY AND DESIGNATE AN EASILY | | | ACCESSIBLE MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20 | | | FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS WITH | | | THE FOLLOWING SPECS: A CONDUIT (2-INCH SCHEDULE 40 PVC) | | | TO THE POWER SOURCE WITH AN ELECTRICAL PULL BOX (240V / | | | 10,000W CIRCUIT). PLEASE PROVIDE A SET OF OPTIONAL | | | LOCATIONS, THE FINAL SELECTION COULD THEN BE PERFORMED | | | AT A LATER STAGE AS A CONDITIONAL APPROVAL | | | 14) SATISFIED. PROVIDE A PARKING TABLE SHOWCASING THE | | | NUMBER OF REQUIRED AND PROVIDED PARKING SPACES, | | | INCLUSIVE OF ADA AND BICYCLE ONES | | | 15) SATISFIED. PROVIDE A TABLE SHOWCASING THE NUMBER OF | | | EXISTING AND PROPOSED ON-STREET PARKING STALLS. PROVIDE | | | THE NUMBER OF METERED STALLS THAT ARE BEING REMOVED OR | | | RELOCATED, IF ANY. PLEASE PROVIDE DOCUMENTATION | | | SHOWCASING APPROVAL FROM PARKING DEPARTMENT FOR THE | | | REMOVAL OF THE SEVEN (7) ON-STREET PARKING STALLS AND | | | FEES PAID, IF ANY | | | 16) SATISFIED. ARE THERE ANY GATES PROPOSED? IF SO, | | | CLEARLY SHOWCASE THE REQUIRED 20 FEET SETBACK DISTANCE | | | FROM THE BACK OF THE SIDEWALK | | | 17) SATISFIED. IS VALET SERVICE PROPOSED? IF SO, | | | PROVIDE A THOROUGH VALET OPERATIONAL ANALYSIS. DETAILS | | | OF THE ANALYSIS SHOULD BE DISCUSSED DURING THE | | | METHODOLOGY MEETING. PLEASE PROVIDE FURTHER NARRATIVE, | | | IDEALLY A PARAGRAPH WITHIN THE TRAFFIC STUDY, REGARDING | | | HOW THE DROP-OFF AREA VEHICULAR OPERATIONS WILL BE | | | REGULATED, OPERATED AND MONITORED. A VALET OPERATIONAL | | | ANALYSIS MUST BE PROVIDED AT THIS STAGE, IF POTENTIALLY | | | CONTEMPLATED IN THE FUTURE | | | 18) SATISFIED. ARE THERE ANY TRANSIT STOPS BEING | | | IMPACTED? | | | 19) SATISFIED. IS THE PROPOSED DEVELOPMENT IMPACTING AN | | | EXISTING BICYCLE FACILITY? | | | 20) SATISFIED. IS A GARAGE BEING PROPOSED? | | | 21) SATISFIED. HAS THE OWNER OF THE PARKING LOT EAST OF | | | S OLIVE AGREED WITH THE CLOSURE OF THE EXISTING | | | DRIVEWAY FRONTING GRUBER PL? | | | 22) SATISFIED. HOW ARE EXISTING OPERATIONS ON KINGS CT | | | BEING IMPACTED? IS ACCESS BEING PARTIALLY OR COMPLETELY | | | REMOVED? | | | 23) SATISFIED. PEDESTRIAN FACILITIES SHOULD BE AT THE | | | MINIMUM 8-FEET WIDE THROUGHOUT THE PROPOSED | | | DEVELOPMENT. GIVEN THE HIGH PEDESTRIAN TRAFFIC OF THE | | | AREA, IT IS RECOMMENDED A MINIMUM OF 10-FEET | | | UNOBSTRUCTED WIDTH, ESPECIALLY ALONG S OLIVE AVE. | | | PLEASE SHOWCASE ALL SIDEWALKS AND THEIR DIMENSIONS IN | | | THE T1.0 PLAN OR PROVIDE DOCUMENT NAME AND SHEET NUMBER | | | DEPICTING SUCH ITEMS | | | 24) SATISFIED. IF APPROVED, THE PROPOSED SOUTHERN | | | DRIVEWAY SHOULD BE ALIGNED WITH CHADBOURNE CT | | | 25) SATISFIED. IF APPROVED, PROVIDE PEDESTRIAN | | | CROSSWALKS NORTH AND SOUTH OF THE PROPOSED SOUTHERN | | | DRIVEWAY | | | 26) SATISFIED. INSTALL PEDESTRIAN CROSSWALKS ON S OLIVE | | | AVE AT THE ACACIA RD INTERSECTION. THIS REQUEST WOULD | | | INCREASE STUDENT/PEDESTRIAN SAFETY NEARBY THE PROPOSED | | | DEVELOPMENT; NONETHELESS, DUE TO PBAU REQUEST, IT WILL | | | BE DELAYED TO FUTURE DEVELOPMENT IN THE AREA | | | 27) SATISFIED. INSTALL A PEDESTRIAN CROSSWALK EITHER | | | NORTH OR SOUTH OF THE PROPOSED NORTHERN DRIVEWAY | | | 28) SATISFIED. INSTALL PEDESTRIAN CROSSWALKS AND | | | CORRESPONDING STOP-FOR-PEDESTRIAN SIGNAGE BY THE | | | WALLINGFORD PLACE AND GRUBER PLACE STREET TRANSITION, | | | JUST SOUTH AND WEST OF THE TURNING PORTION, | | | RESPECTIVELY | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
2 |
Status |
F |
Date |
01-20-2023 |
|
|
Cont ID |
|
| Sent By |
|
Date |
01-20-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
01-20-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-01-20 12:36:52 | TRAFFIC COMMENTS | | | 1) SATISFIED. SETUP A TRAFFIC ANALYSIS METHODOLOGY | | | MEETING | | | 2) PARTIALLY SATISFIED. PROVIDE A FULL DETAILED TRAFFIC | | | STUDY. PER OTHER COMMENTS, THE ANALYSIS MAY NEED | | | REVISION OR INCLUSION OF FURTHER ITEMS | | | 3) SATISFIED. PROVIDE COUNTY TPS LETTER | | | 4) PARTIALLY SATISFIED. PROVIDE A PARKING MANAGEMENT | | | PLAN. PLEASE PROVIDE DOCUMENTATION PERTAINING THE | | | AGREEMENTS FOR THE CROSS-PARKING FACILITIES NOT OWNED | | | BY PBAU AND OUTSIDE OF THE CSPD; SPECIFICALLY, A | | | STATEMENT OR ACKNOWLEDGEMENT BY EACH FACILITY OWNER(S) | | | THAT CONFIRMS AVAILABILITY OF EXTRA PARKING CAPACITY AT | | | THEIR FACILITIES TO ACCOMMODATE PBAU DEMAND | | | 5) TO BE SATISFIED BEFORE BUILDING PERMIT APPLICATION. | | | PROVIDE A CONSTRUCTION MANAGEMENT PLAN. PLEASE REFER TO | | | CITY CODE 86-246 FOR DETAILS. THIS ITEM WILL BE | | | INCLUDED IN THE CONDITIONAL APPROVAL | | | 6) PARTIALLY SATISFIED. DEPENDING ON THE OUTCOME OF THE | | | TRAFFIC ANALYSIS, TRANSPORTATION DEMAND MANAGEMENT | | | (TDM) MEASURES MAY BE ENCOURAGED. TO BE FURTHER | | | DISCUSSED AND/OR CONDITIONALLY APPROVED, AND INCLUDED | | | IN THE ANALYSIS | | | | | | SITE COMMENTS | | | 7) NOT SATISFIED. PROVIDE A TRANSPORTATION SPECIFIC | | | SITE PLAN FOR THE GROUND FLOOR. SHOWCASING | | | TRANSPORTATION RELATED FEATURES (E.G. ROADWAY WIDTHS, | | | DRIVING AISLES, PARKING STALLS, SIDEWALK, CURB, GUTTER, | | | DRIVEWAY, GATES, CROSSWALKS, VISIBILITY TRIANGLE, | | | CORNER & DRIVEWAY SEPARATION DISTANCES, SLOPES, ETC.) | | | PROPERLY LABELED AND DIMENSIONED. THE SITE PLAN SHOULD | | | BE NAMED T-1.0. LATEST SUBMISSION PROVIDES VERY FEW OF | | | THE REQUESTED ITEMS IN THIS COMMENT, ALL DIMENSIONS AND | | | PROPOSED SITE FEATURES ARE MISSING | | | 8) SATISFIED. THE TRANSPORTATION SITE PLAN SHOULD | | | INCLUDE DIXIE HIGHWAY AND ACACIA RD AS THE WESTERN AND | | | SOUTHERN BOUNDARIES, RESPECTIVELY | | | 9) PARTIALLY SATISFIED. IN THE T-1.0 SITE PLAN, PLEASE | | | SHOWCASE BASIC CURB DETAILS (E.G. DRIVEWAY, CURB CUTS, | | | PAVEMENT MARKINGS, PARKING STALLS, ETC.) ON THE | | | OPPOSITE SIDE OF THE ROADS SURROUNDING THE PROPOSED | | | DEVELOPMENT. DETAILS MUST BE DRAWN, PLEASE COMPLETE THE | | | T-1 SHEET ACCORDINGLY | | | 10) PARTIALLY SATISFIED. PROVIDE A SIGNAGE AND PAVEMENT | | | MARKING PLAN. INCLUSIVE OF ALL FEATURES WITHIN THE | | | PROPOSED DEVELOPMENT AND ALONG ALL ROADS FRONTING THE | | | SITE. SUCH PLAN COULD BE INCORPORATED IN THE | | | TRANSPORTATION SITE ONE. PLEASE PROVIDE THE SPECIFIC | | | CIVIL SHEET NAME/NUMBER OR INCLUDE IN THE T-1.0 PLAN. | | | 11) SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE | | | TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND OUT OF THE | | | PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES AND | | | WHEEL PATHS CLEARLY DISTINCT AND DEFINED IN DIFFERENT | | | COLORS | | | 12) SATISFIED. PROVIDE ENGINEERING REFERENCE AND SPECS | | | SHEETS FOR EACH OF THE PROPOSED TRANSPORTATION FEATURES | | | (E.G. CURB, RAMP, GATE, SIGNAGE, PAVEMENT MARKING, | | | SIGNAL, ETC.) | | | 13) PARTIALLY SATISFIED. IDENTIFY AND DESIGNATE AN | | | EASILY ACCESSIBLE MICRO-MOBILITY STATION AREA (MINIMUM | | | 8 X 20 FEET) AND PROVIDE BASIC ELECTRIFICATION | | | READINESS WITH THE FOLLOWING SPECS: A CONDUIT (2-INCH | | | SCHEDULE 40 PVC) TO THE POWER SOURCE WITH AN ELECTRICAL | | | PULL BOX (240V / 10,000W CIRCUIT). PLEASE PROVIDE A SET | | | OF OPTIONAL LOCATIONS, THE FINAL SELECTION COULD THEN | | | BE PERFORMED AT A LATER STAGE AS A CONDITIONAL APPROVAL | | | 14) SATISFIED. PROVIDE A PARKING TABLE SHOWCASING THE | | | NUMBER OF REQUIRED AND PROVIDED PARKING SPACES, | | | INCLUSIVE OF ADA AND BICYCLE ONES | | | 15) PARTIALLY SATISFIED. PROVIDE A TABLE SHOWCASING THE | | | NUMBER OF EXISTING AND PROPOSED ON-STREET PARKING | | | STALLS. PROVIDE THE NUMBER OF METERED STALLS THAT ARE | | | BEING REMOVED OR RELOCATED, IF ANY. PLEASE PROVIDE | | | DOCUMENTATION SHOWCASING APPROVAL FROM PARKING | | | DEPARTMENT FOR THE REMOVAL OF THE SEVEN (7) ON-STREET | | | PARKING STALLS AND FEES PAID, IF ANY | | | 16) SATISFIED. ARE THERE ANY GATES PROPOSED? IF SO, | | | CLEARLY SHOWCASE THE REQUIRED 20 FEET SETBACK DISTANCE | | | FROM THE BACK OF THE SIDEWALK | | | 17) PARTIALLY SATISFIED. IS VALET SERVICE PROPOSED? IF | | | SO, PROVIDE A THOROUGH VALET OPERATIONAL ANALYSIS. | | | DETAILS OF THE ANALYSIS SHOULD BE DISCUSSED DURING THE | | | METHODOLOGY MEETING. PLEASE PROVIDE FURTHER NARRATIVE, | | | IDEALLY A PARAGRAPH WITHIN THE TRAFFIC STUDY, REGARDING | | | HOW THE DROP-OFF AREA VEHICULAR OPERATIONS WILL BE | | | REGULATED, OPERATED AND MONITORED. A VALET OPERATIONAL | | | ANALYSIS MUST BE PROVIDED AT THIS STAGE, IF POTENTIALLY | | | CONTEMPLATED IN THE FUTURE | | | 18) SATISFIED. ARE THERE ANY TRANSIT STOPS BEING | | | IMPACTED? | | | 19) SATISFIED. IS THE PROPOSED DEVELOPMENT IMPACTING AN | | | EXISTING BICYCLE FACILITY? | | | 20) SATISFIED. IS A GARAGE BEING PROPOSED? | | | 21) SATISFIED. HAS THE OWNER OF THE PARKING LOT EAST OF | | | S OLIVE AGREED WITH THE CLOSURE OF THE EXISTING | | | DRIVEWAY FRONTING GRUBER PL? | | | 22) SATISFIED. HOW ARE EXISTING OPERATIONS ON KINGS CT | | | BEING IMPACTED? IS ACCESS BEING PARTIALLY OR COMPLETELY | | | REMOVED? | | | 23) PARTIALLY SATISFIED. PEDESTRIAN FACILITIES SHOULD | | | BE AT THE MINIMUM 8-FEET WIDE THROUGHOUT THE PROPOSED | | | DEVELOPMENT. GIVEN THE HIGH PEDESTRIAN TRAFFIC OF THE | | | AREA, IT IS RECOMMENDED A MINIMUM OF 10-FEET | | | UNOBSTRUCTED WIDTH, ESPECIALLY ALONG S OLIVE AVE. | | | PLEASE SHOWCASE ALL SIDEWALKS AND THEIR DIMENSIONS IN | | | THE T1.0 PLAN OR PROVIDE DOCUMENT NAME AND SHEET NUMBER | | | DEPICTING SUCH ITEMS | | | 24) SATISFIED. IF APPROVED, THE PROPOSED SOUTHERN | | | DRIVEWAY SHOULD BE ALIGNED WITH CHADBOURNE CT | | | 25) SATISFIED. IF APPROVED, PROVIDE PEDESTRIAN | | | CROSSWALKS NORTH AND SOUTH OF THE PROPOSED SOUTHERN | | | DRIVEWAY | | | 26) SATISFIED. INSTALL PEDESTRIAN CROSSWALKS ON S OLIVE | | | AVE AT THE ACACIA RD INTERSECTION. THIS REQUEST WOULD | | | INCREASE STUDENT/PEDESTRIAN SAFETY NEARBY THE PROPOSED | | | DEVELOPMENT; NONETHELESS, DUE TO PBAU REQUEST, IT WILL | | | BE DELAYED TO FUTURE DEVELOPMENT IN THE AREA | | | 27) SATISFIED. INSTALL A PEDESTRIAN CROSSWALK EITHER | | | NORTH OR SOUTH OF THE PROPOSED NORTHERN DRIVEWAY | | | 28) INSTALL PEDESTRIAN CROSSWALKS AND CORRESPONDING | | | STOP-FOR-PEDESTRIANS SIGNAGE BY THE WALLINGFORD PLACE | | | AND GRUBER PLACE STREET TRANSITION, JUST SOUTH AND WEST | | | OF THE TURNING PORTION, RESPECTIVELY | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
12-06-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
12-06-2022 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
12-06-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-12-06 18:07:23 | TRAFFIC COMMENTS | | | 1) SETUP A TRAFFIC ANALYSIS METHODOLOGY MEETING | | | 2) PROVIDE A FULL DETAILED TRAFFIC STUDY | | | 3) PROVIDE COUNTY TPS LETTER | | | 4) PROVIDE A PARKING MANAGEMENT PLAN | | | 5) PROVIDE A CONSTRUCTION MANAGEMENT PLAN. PLEASE REFER | | | TO CITY CODE 86-246 FOR DETAILS | | | 6) DEPENDING ON THE OUTCOME OF THE TRAFFIC ANALYSIS, | | | TRANSPORTATION DEMAND MANAGEMENT (TDM) MEASURES MAY BE | | | ENCOURAGED | | | SITE COMMENTS | | | 7) PROVIDE A TRANSPORTATION SPECIFIC SITE PLAN FOR THE | | | GROUND FLOOR. SHOWCASING TRANSPORTATION RELATED | | | FEATURES (E.G. ROADWAY WIDTHS, DRIVING AISLES, PARKING | | | STALLS, SIDEWALK, CURB, GUTTER, DRIVEWAY, GATES, | | | CROSSWALKS, VISIBILITY TRIANGLE, CORNER & DRIVEWAY | | | SEPARATION DISTANCES, SLOPES, ETC.) PROPERLY LABELED | | | AND DIMENSIONED. THE SITE PLAN SHOULD BE NAMED T-1.0 | | | 8) THE TRANSPORTATION SITE PLAN SHOULD INCLUDE DIXIE | | | HIGHWAY AND ACACIA RD AS THE WESTERN AND SOUTHERN | | | BOUNDARIES, RESPECTIVELY | | | 9) IN THE T-1.0 SITE PLAN, PLEASE SHOWCASE BASIC CURB | | | DETAILS (E.G. DRIVEWAY, CURB CUTS, PAVEMENT MARKINGS, | | | PARKING STALLS, ETC.) ON THE OPPOSITE SIDE OF THE ROADS | | | SURROUNDING THE PROPOSED DEVELOPMENT | | | 10) PROVIDE A SIGNAGE AND PAVEMENT MARKING PLAN. | | | INCLUSIVE OF ALL FEATURES WITHIN THE PROPOSED | | | DEVELOPMENT AND ALONG ALL ROADS FRONTING THE SITE. SUCH | | | PLAN COULD BE INCORPORATED IN THE TRANSPORTATION SITE | | | ONE | | | 11) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND/OR | | | SERVICE VEHICLES DRIVING IN AND OUT OF THE PROPOSED | | | DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES AND WHEEL | | | PATHS CLEARLY DISTINCT AND DEFINED IN DIFFERENT COLORS | | | 12) PROVIDE ENGINEERING REFERENCE AND SPECS SHEETS FOR | | | EACH OF THE PROPOSED TRANSPORTATION FEATURES (E.G. | | | CURB, RAMP, GATE, SIGNAGE, PAVEMENT MARKING, SIGNAL, | | | ETC.) | | | 13) IDENTIFY AND DESIGNATE AN EASILY ACCESSIBLE | | | MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20 FEET) AND | | | PROVIDE BASIC ELECTRIFICATION READINESS WITH THE | | | FOLLOWING SPECS: A CONDUIT (2-INCH SCHEDULE 40 PVC) TO | | | THE POWER SOURCE WITH AN ELECTRICAL PULL BOX (240V / | | | 10,000W CIRCUIT) | | | 14) PROVIDE A PARKING TABLE SHOWCASING THE NUMBER OF | | | REQUIRED AND PROVIDED PARKING SPACES, INCLUSIVE OF ADA | | | AND BICYCLE ONES | | | 15) PROVIDE A TABLE SHOWCASING THE NUMBER OF EXISTING | | | AND PROPOSED ON-STREET PARKING STALLS. PROVIDE THE | | | NUMBER OF METERED STALLS THAT ARE BEING REMOVED OR | | | RELOCATED, IF ANY | | | 16) ARE THERE ANY GATES PROPOSED? IF SO, CLEARLY | | | SHOWCASE THE REQUIRED 20 FEET SETBACK DISTANCE FROM THE | | | BACK OF THE SIDEWALK | | | 17) IS VALET SERVICE PROPOSED? IF SO, PROVIDE A | | | THOROUGH VALET OPERATIONAL ANALYSIS. DETAILS OF THE | | | ANALYSIS SHOULD BE DISCUSSED DURING THE METHODOLOGY | | | MEETING | | | 18) ARE THERE ANY TRANSIT STOPS BEING IMPACTED? | | | 19) IS THE PROPOSED DEVELOPMENT IMPACTING AN EXISTING | | | BICYCLE FACILITY? | | | 20) IS A GARAGE BEING PROPOSED? | | | 21) HAS THE OWNER OF THE PARKING LOT EAST OF S OLIVE | | | AGREED WITH THE CLOSURE OF THE EXISTING DRIVEWAY | | | FRONTING GRUBER PL? | | | 22) HOW ARE EXISTING OPERATIONS ON KINGS CT BEING | | | IMPACTED? IS ACCESS BEING PARTIALLY OR COMPLETELY | | | REMOVED? | | | 23) PEDESTRIAN FACILITIES SHOULD BE AT THE MINIMUM | | | 8-FEET WIDE THROUGHOUT THE PROPOSED DEVELOPMENT. GIVEN | | | THE HIGH PEDESTRIAN TRAFFIC OF THE AREA, IT IS | | | RECOMMENDED A MINIMUM OF 10-FEET UNOBSTRUCTED WIDTH, | | | ESPECIALLY ALONG S OLIVE AVE | | | 24) IF APPROVED, THE PROPOSED SOUTHERN DRIVEWAY SHOULD | | | BE ALIGNED WITH CHADBOURNE CT | | | 25) IF APPROVED, PROVIDE PEDESTRIAN CROSSWALKS NORTH | | | AND SOUTH OF THE PROPOSED SOUTHERN DRIVEWAY | | | 26) INSTALL PEDESTRIAN CROSSWALKS ON S OLIVE AVE AT THE | | | ACACIA RD INTERSECTION | | | 27) INSTALL A PEDESTRIAN CROSSWALK EITHER NORTH OR | | | SOUTH OF THE PROPOSED NORTHERN DRIVEWAY | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
P |
Date |
05-10-2023 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
05-10-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
05-10-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-05-10 14:03:05 | THE PROVISIONS IN RESOLUTION NO. 17-22 SHALL REMAIN IN | | | EFFECT, IN ADDITION TO THE FOLLOWING ADDITIONAL | | | CONDITIONS: | | | | | | 1. THE ABANDONMENT OF THE 12,596 SQUARE FOOT PORTION OF | | | GRUBER PLACE AS IDENTIFIED IN PLANNING BOARD CASE NO. | | | 1111AAA, SHALL BE APPROVED BY THE CITY COMMISSION PRIOR | | | TO THE ISSUANCE OF ANY BUILDING PERMITS ASSOCIATED WITH | | | THE CONSTRUCTION OF THE NEW BUSINESS SCHOOL BUILDING. | | | | | | 2. AT ANY TIME SHOULD THERE BE AN APPLICATION FOR THE | | | REDEVELOPMENT OF A SITE THAT IS CURRENTLY LEASED BY THE | | | UNIVERSITY TO PROVIDE THE NECESSARY PARKING FOR THE | | | PBAU CSPD AND/OR IF CHANGES ARE MADE TO A PARKING LEASE | | | AGREEMENT THAT IMPACTS THE UNIVERSITY'S PARKING | | | INVENTORY, THE UNIVERSITY SHALL SUBMIT AN UPDATED | | | PARKING REPORT THAT DEMONSTRATES THAT THE UNIVERSITY | | | WILL CONTINUE TO MEET THE PARKING DEMAND THAT'S | | | AVAILABLE TO ITS STAFF, STUDENTS AND VISITORS. THE | | | STANDARDS FOR THIS PARKING REPORT SHALL BE CONSISTENT | | | WITH THE REQUIREMENTS OF THE ANNUAL PARKING STUDY AS | | | PROVIDED IN RESOLUTION NO. 277-20. THE PARKING REPORT | | | SHALL BE SUBMITTED TO THE DEVELOPMENT SERVICES | | | DEPARTMENT - PLANNING DIVISION FOR REVIEW. | | | | | | 3. PRIOR TO THE SUBMISSION OF A BUILDING PERMIT FOR THE | | | CONSTRUCTION OF THE NEW BUSINESS SCHOOL BUILDING, THE | | | APPLICANT SHALL PROVIDE A CONSTRUCTION MANAGEMENT PLAN. | | | THE CONSTRUCTION MANAGEMENT PLAN SHALL BE CONSISTENT | | | WITH THE REQUIREMENTS OF SECTION 86-246 OF THE CITY OF | | | WEST PALM BEACH CODE OF ORDINANCES. | | | | | | 4. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES, A | | | TREE ALTERATION PERMIT SHALL BE SUBMITTED, REVIEWED AND | | | APPROVED BY THE DEVELOPMENT SERVICES DEPARTMENT - | | | PLANNING DIVISION. | | | | | | 5. PRIOR TO THE ISSUANCE OF THE FIRST BUILDING PERMIT | | | FOR THE NEW BUSINESS SCHOOL BUILDING, THE APPLICANT | | | SHALL SUBMIT A REVISED LANDSCAPE PLAN WITH A TREE | | | ALTERATION PERMIT SHOWING THE LOCATIONS AND SPECIES OF | | | TREES TO MEET THE TREE MITIGATION REQUIRED FOR THE | | | PROJECT. ALL MITIGATION TREES SHALL BE PLANTED IN | | | ACCORDANCE WITH THE APPROVED PLANS AND PRIOR TO THE | | | ISSUANCE OF A CERTIFICATE OF OCCUPANCY (C.O.). | | | | | | 6. FINAL APPROVAL OF THE ENGINEERING DESIGN SHALL BE | | | BASED UPON SUBMITTAL OF A SEPARATE ENGINEERING PERMIT | | | APPLICATION TO, AND REVIEWED BY, THE CITY'S PUBLIC | | | WORKS AND ENGINEERING DEPARTMENTS. | | | | | | 7. PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY | | | (C.O.), THE SUBJECT PROPERTY SHALL BE RE-PLATTED IN | | | ACCORDANCE WITH ALL APPLICABLE STATUTES, REGULATIONS, | | | AND THE CITY'S POLICIES AND PROCEDURES. | | | | | | 8. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | RIGHT-OF-WAY LANDSCAPING AND IRRIGATION APPROVED WITH | | | THIS APPLICATION. | | | | | | 9. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF ALL STREETSCAPE, | | | LANDSCAPING AND IRRIGATION IMPROVEMENTS WITHIN THE | | | RIGHT-OF-WAY APPROVED WITH THIS APPLICATION. A SEPARATE | | | MAINTENANCE AGREEMENT SHALL BE REQUIRED AND EXECUTED | | | PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY | | | (C.O.). | | | | | | 10. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE DRAINAGE SYSTEM | | | PIPES AND STRUCTURES WITHIN THE RIGHT-OF-WAY UPSTREAM | | | OF CONTROL STRUCTURE CB-1. A MAINTENANCE AGREEMENT MAY | | | NEED TO BE PROVIDED TO THE CITY. | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
03-10-2023 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
03-10-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
03-10-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-03-10 15:51:14 | PLANS AND PLATS REVIEW COMMITTEE (PPRC) ZONING REVIEW | | | ________________________________________ | | | | | | DATE OF REVIEW: 03.10.2023 | | | ________________________________________ | | | | | | PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING | | | REVIEW COMMENTS: | | | | | | 1. SATISFIED - PROPERTY OWNERS LIST AFFIDAVIT SHALL BE | | | PROVIDED. | | | | | | 2. NOT SATISFIED - OUTSTANDING PUBLIC UTILITY LETTERS | | | SHALL BE PROVIDED. | | | | | | 3. SATISFIED (SUBJECT TO CONDITIONS OF APPROVAL) - | | | PLEASE NOTE THE PAYMENT THAT WILL BE REQUIRED FOR THE | | | ABANDONMENT OF THE RIGHT-OF-WAY AND THE LOSS OF SEVEN | | | (7) METERED PARKING SPACES. | | | | | | 4. PARTIALLY SATISFIED - STAFF WOULD LIKE TO HAVE A | | | SPECIFIC DISCUSSION REGARDING THE PARKING ANALYSIS THAT | | | WAS SUBMITTED IN IN AUGUST 2022, AS WELL AS THE | | | SUPPLEMENTAL STATEMENT THAT WAS PROVIDED AS PART OF | | | THIS APPLICATION. SOME OF THE CONCERNS INCLUDE, BUT ARE | | | NOT LIMITED TO: | | | | | | 4.1. SATISFIED - THE PARKING ANALYSIS PROVIDED | | | INDICATES THAT ADDITIONAL OFF-SITE PARKING SPACES HAVE | | | BEEN OBTAINED ON A LEASED BASIS (BOTH ADDITIONAL | | | LOCATIONS, AS WELL AS ADDITIONAL SPACES AT EXISTING | | | LOCATIONS). PURSUANT TO THE PBAU DEVELOPMENT ORDER, | | | COPIES OF THE NEW/UPDATED LEASES OR AGREEMENTS SHALL BE | | | PROVIDED. | | | | | | 4.2. SATISFIED - THE NUMBER OF PARKING SPACES SHOWN IN | | | THE PARKING STUDY DOES NOT CORRESPOND TO THE NUMBER OF | | | SPACES SHOWN IN THE VARIOUS LOTS AS WELL AS THE NUMBERS | | | IN THE MASTER PLAN DATA TABLE. | | | | | | 4.3. SATISFIED - THE METHODOLOGY APPEARS TO HAVE | | | CHANGED SOMEWHAT SINCE THE INCEPTION OF THE PARKING | | | STUDY REQUIREMENT. | | | | | | 4.4. NOT SATISFIED - LEASES APPEAR TO BE EXPIRED BUT | | | ARE STILL BE UTILIZED FOR THE PARKING AVAILABILITY. | | | | | | 4.4.1. NOT SATISFIED - THE LACK OF AN VALID LEASE | | | PRESENTS CONCERNS AS IT APPEARS THAT THIS PARKING | | | AVAILIABILITY COULD BE WITHDRAWN FROM PBAU'S USE AT ANY | | | TIME, THEREBY LEAVING THE UNIVERSITY WITH FEWER PARKING | | | SPACES THAN WHAT IS REPRESENTED IN THE REQUIRED STUDY, | | | AND POTENTIALLY CREATING A VIOLATION OF THE DEVELOPMENT | | | ORDER. | | | | | | 4.5. NOT SATISFIED - SPACES ARE BEING LEASED FROM | | | LOCATIONS THAT APPEAR TO NOT HAVE EXCESS PARKING | | | AVAILABLE. | | | | | | 4.5.1. NOT SATISFIED - THE RESPONSE TO COMMENTS | | | INDICATES THAT THESE LOCATIONS EXPERIENCE DIFFERING | | | PEAK TIME, HOWEVER NO ANALYSIS OF INFORMATION WAS | | | PROVIDED TO SUPPORT THIS ARGUMENT. THE NORTON WAS | | | GRANTED A SUBSTANTIAL PARKING WAIVER AND EVEN UTILIZED | | | THE JUSTIFICATION THAT OVERFLOW PARKING COULD BE | | | ACCOMMODATED AT PBAU. IF DIFFERING PEAK TIMES IS | | | UTILIZED AS A JUSTIFICATION, APPROPRIATE INFORMATION | | | NEEDS TO BE PROVIDED TO SUPPORT SUCH ARGUMENT. | | | | | | 4.6. NEW COMMENT ??? IT IS NOTED IN THE 2022 CAMPUS | | | PARKING STUDY THAT SHUTTLE SERVICE WILL BE DEPLOYED IN | | | THE 2022/2023 ACADEMIC YEAR; HOWEVER, NO DETAILS ARE | | | PROVIDED ON THE OPERATIONS/SERVICE. SINCE SOME OF THE | | | PARKING FACILITIES ARE LOCATED OUTSIDE OF THE CSPD AND | | | ARE NOT LOCATED WITHIN A REASONABLE WALKING DISTANCE | | | (YET THESE FACILITIES ARE INCLUDED IN THE PARKING | | | INVENTORY TO MEET DEMAND), IT IS IMPORTANT TO PROVIDE | | | INFORMATION HOW STUDENTS WILL GET FROM THESE PARKING | | | FACILITIES TO THE MAIN CAMPUS. | | | | | | 5. SATISFIED - PLEASE PROVIDE INFORMATION SHOWING | | | COMPLIANCE WITH THE OVERALL MASTER PLAN FAR | | | REQUIREMENT. | | | | | | 6. SATISFIED - GENERATOR ENCLOSURE. | | | | | | 7. SATISFIED - IRRIGATION PLANS DO NOT MATCH THE | | | LANDSCAPE/SITE PLAN. | | | | | | 8. SATISFIED - ARCHITECTURAL ELEVATIONS INDICATE | | | POTENTIAL BANNER SIGNAGE ??? THE MASTER SIGN PLAN WOULD | | | HAVE TO BE AMENDED. | | | | | | 9. SATISFIED - PLEASE PROVIDE ELEVATION POINTS ON THE | | | SITE PLAN AND/OR CROSS SECTIONS WITH ELEVATIONS | | | SPECIFICALLY INDICATING COMPLIANCE WITH THE MAXIMUM | | | ENCROACHMENT PERMITTED INTO THE REQUIRED SETBACKS. | | | STEPS, STAIRS, RAMPS, ETC. THAT ARE THREE (3) FEET OR | | | LESS CAN ENCROACH INTO THE SETBACK UP TO TWO (2) FEET | | | FROM THE PROPERTY LINE. STEPS, STAIRS, RAMPS, ETC. IN | | | EXCESS OF THREE (3) FEET HAVE TO COMPLY WITH THE | | | BUILDING SETBACK REQUIREMENTS. | | | | | | 10. SATISFIED - STAFF WOULD LIKE TO HAVE DISCUSSION | | | REGARDING THE SOUTH DROP OFF AREA, THE PINCH POINT IN | | | THE SIDEWALK CREATED BETWEEN THE DROP OFF AND GRUBER | | | PLACE, AS WELL AS SOME OTHER AREAS THAT ARE BEING SHOWN | | | AS PAVER/SIDEWALK THAT DON???T SEEM FUNCTIONAL (I.E. | | | AREA WEST OF DUMPSTER ENCLOSURES). | | | | | | 10.1. SATISFIED - THE LABEL FOR THE DROP-OFF AREA IS | | | NOW POINTING TO THE SIDEWALK. | | | | | | 10.2. SATISFIED - WHERE THE SIDEWALK ABUTS WALLINGFORD | | | PLACE, ESPECIALLY AT THE BEND, THERE SHOULD BE SOME | | | DESIGN CONSIDERATION TO ENSURE THAT VEHICLES DO NOT | | | HAVE THE ABILITY TO RUN UP ONTO THE SIDEWALK, | | | ESPECIALLY IF THEY MISS THE TURN. | | | | | | ________________________________________ | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
02-24-2023 |
|
|
Cont ID |
|
| Sent By |
jroach |
Date |
02-24-2023 |
Time |
12:51 |
Rev Time |
0.00 |
| Received By |
jroach |
Date |
02-03-2023 |
Time |
10:12 |
Sent To |
|
|
| Notes |
| 2023-02-24 12:51:52 | PLANS AND PLATS REVIEW COMMITTEE (PPRC) ZONING REVIEW | | | ________________________________________ | | | | | | DATE OF REVIEW: 02.03.2023 | | | ________________________________________ | | | | | | PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING | | | REVIEW COMMENTS: | | | | | | 1. SATISFIED - PROPERTY OWNERS LIST AFFIDAVIT SHALL BE | | | PROVIDED. | | | | | | 2. NOT SATISFIED - OUTSTANDING PUBLIC UTILITY LETTERS | | | SHALL BE PROVIDED. | | | | | | 3. SATISFIED (SUBJECT TO CONDITIONS OF APPROVAL) - | | | PLEASE NOTE THE PAYMENT THAT WILL BE REQUIRED FOR THE | | | ABANDONMENT OF THE RIGHT-OF-WAY AND THE LOSS OF SEVEN | | | (7) METERED PARKING SPACES. | | | | | | 4. PARTIALLY SATISFIED - STAFF WOULD LIKE TO HAVE A | | | SPECIFIC DISCUSSION REGARDING THE PARKING ANALYSIS THAT | | | WAS SUBMITTED IN IN AUGUST 2022, AS WELL AS THE | | | SUPPLEMENTAL STATEMENT THAT WAS PROVIDED AS PART OF | | | THIS APPLICATION. SOME OF THE CONCERNS INCLUDE, BUT ARE | | | NOT LIMITED TO: | | | | | | 4.1. SATISFIED - THE PARKING ANALYSIS PROVIDED | | | INDICATES THAT ADDITIONAL OFF-SITE PARKING SPACES HAVE | | | BEEN OBTAINED ON A LEASED BASIS (BOTH ADDITIONAL | | | LOCATIONS, AS WELL AS ADDITIONAL SPACES AT EXISTING | | | LOCATIONS). PURSUANT TO THE PBAU DEVELOPMENT ORDER, | | | COPIES OF THE NEW/UPDATED LEASES OR AGREEMENTS SHALL BE | | | PROVIDED. | | | | | | 4.2. SATISFIED - THE NUMBER OF PARKING SPACES SHOWN IN | | | THE PARKING STUDY DOES NOT CORRESPOND TO THE NUMBER OF | | | SPACES SHOWN IN THE VARIOUS LOTS AS WELL AS THE NUMBERS | | | IN THE MASTER PLAN DATA TABLE. | | | | | | 4.3. SATISFIED - THE METHODOLOGY APPEARS TO HAVE | | | CHANGED SOMEWHAT SINCE THE INCEPTION OF THE PARKING | | | STUDY REQUIREMENT. | | | | | | 4.4. NOT SATISFIED - LEASES APPEAR TO BE EXPIRED BUT | | | ARE STILL BE UTILIZED FOR THE PARKING AVAILABILITY. | | | | | | 4.4.1. NEW COMMENT - THE LACK OF AN VALID LEASE | | | PRESENTS CONCERNS AS IT APPEARS THAT THIS PARKING | | | AVAILIABILITY COULD BE WITHDRAWN FROM PBAU'S USE AT ANY | | | TIME, THEREBY LEAVING THE UNIVERSITY WITH FEWER PARKING | | | SPACES THAN WHAT IS REPRESENTED IN THE REQUIRED STUDY, | | | AND POTENTIALLY CREATING A VIOLATION OF THE DEVELOPMENT | | | ORDER. | | | | | | 4.5. NOT SATISFIED - SPACES ARE BEING LEASED FROM | | | LOCATIONS THAT APPEAR TO NOT HAVE EXCESS PARKING | | | AVAILABLE. | | | | | | 4.5.1. NEW COMMENT ??? THE RESPONSE TO COMMENTS | | | INDICATES THAT THESE LOCATIONS EXPERIENCE DIFFERING | | | PEAK TIME, HOWEVER NO ANALYSIS OF INFORMATION WAS | | | PROVIDED TO SUPPORT THIS ARGUMENT. THE NORTON WAS | | | GRANTED A SUBSTANTIAL PARKING WAIVER AND EVEN UTILIZED | | | THE JUSTIFICATION THAT OVERFLOW PARKING COULD BE | | | ACCOMMODATED AT PBAU. IF DIFFERING PEAK TIMES IS | | | UTILIZED AS A JUSTIFICATION, APPROPRIATE INFORMATION | | | NEEDS TO BE PROVIDED TO SUPPORT SUCH ARGUMENT. | | | | | | 5. SATISFIED - PLEASE PROVIDE INFORMATION SHOWING | | | COMPLIANCE WITH THE OVERALL MASTER PLAN FAR | | | REQUIREMENT. | | | | | | 6. SATISFIED - GENERATOR ENCLOSURE. | | | | | | 7. SATISFIED - IRRIGATION PLANS DO NOT MATCH THE | | | LANDSCAPE/SITE PLAN. | | | | | | 8. SATISFIED - ARCHITECTURAL ELEVATIONS INDICATE | | | POTENTIAL BANNER SIGNAGE ??? THE MASTER SIGN PLAN WOULD | | | HAVE TO BE AMENDED. | | | | | | 9. SATISFIED - PLEASE PROVIDE ELEVATION POINTS ON THE | | | SITE PLAN AND/OR CROSS SECTIONS WITH ELEVATIONS | | | SPECIFICALLY INDICATING COMPLIANCE WITH THE MAXIMUM | | | ENCROACHMENT PERMITTED INTO THE REQUIRED SETBACKS. | | | STEPS, STAIRS, RAMPS, ETC. THAT ARE THREE (3) FEET OR | | | LESS CAN ENCROACH INTO THE SETBACK UP TO TWO (2) FEET | | | FROM THE PROPERTY LINE. STEPS, STAIRS, RAMPS, ETC. IN | | | EXCESS OF THREE (3) FEET HAVE TO COMPLY WITH THE | | | BUILDING SETBACK REQUIREMENTS. | | | | | | 10. PARTIALLY SATISFIED - STAFF WOULD LIKE TO HAVE | | | DISCUSSION REGARDING THE SOUTH DROP OFF AREA, THE PINCH | | | POINT IN THE SIDEWALK CREATED BETWEEN THE DROP OFF AND | | | GRUBER PLACE, AS WELL AS SOME OTHER AREAS THAT ARE | | | BEING SHOWN AS PAVER/SIDEWALK THAT DON???T SEEM | | | FUNCTIONAL (I.E. AREA WEST OF DUMPSTER ENCLOSURES). | | | | | | 10.1. NEW COMMENT - THE LABEL FOR THE DROP-OFF AREA IS | | | NOW POINTING TO THE SIDEWALK. | | | | | | 10.2. NEW COMMENT - WHERE THE SIDEWALK ABUTS | | | WALLINGFORD PLACE, ESPECIALLY AT THE BEND, THERE SHOULD | | | BE SOME DESIGN CONSIDERATION TO ENSURE THAT VEHICLES DO | | | NOT HAVE THE ABILITY TO RUN UP ONTO THE SIDEWALK, | | | ESPECIALLY IF THEY MISS THE TURN. | | | ________________________________________ | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
12-13-2022 |
|
|
Cont ID |
|
| Sent By |
jroach |
Date |
12-13-2022 |
Time |
12:55 |
Rev Time |
0.00 |
| Received By |
jroach |
Date |
12-13-2022 |
Time |
12:55 |
Sent To |
|
|
| Notes |
| 2022-12-13 12:56:10 | PLANS AND PLATS REVIEW COMMITTEE (PPRC) ZONING REVIEW | | | ________________________________________ | | | | | | DATE OF REVIEW: 12.13.2022 | | | ________________________________________ | | | | | | PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING | | | REVIEW COMMENTS: | | | | | | 1. PROPERTY OWNERS LIST AFFIDAVIT SHALL BE PROVIDED. | | | | | | 2. OUTSTANDING PUBLIC UTILITY LETTERS SHALL BE | | | PROVIDED. | | | | | | 3. PLEASE NOTE THE PAYMENT THAT WILL BE REQUIRED FOR | | | THE ABANDONMENT OF THE RIGHT-OF-WAY AND THE LOSS OF | | | SEVEN (7) METERED PARKING SPACES. | | | | | | 4. STAFF WOULD LIKE TO HAVE A SPECIFIC DISCUSSION | | | REGARDING THE PARKING ANALYSIS THAT WAS SUBMITTED IN IN | | | AUGUST 2022, AS WELL AS THE SUPPLEMENTAL STATEMENT THAT | | | WAS PROVIDED AS PART OF THIS APPLICATION. SOME OF THE | | | CONCERNS INCLUDE, BUT ARE NOT LIMITED TO: | | | | | | 4.1. THE PARKING ANALYSIS PROVIDED INDICATES THAT | | | ADDITIONAL OFF-SITE PARKING SPACES HAVE BEEN OBTAINED | | | ON A LEASED BASIS (BOTH ADDITIONAL LOCATIONS, AS WELL | | | AS ADDITIONAL SPACES AT EXISTING LOCATIONS). PURSUANT | | | TO THE PBAU DEVELOPMENT ORDER, COPIES OF THE | | | NEW/UPDATED LEASES OR AGREEMENTS SHALL BE PROVIDED. | | | | | | 4.2. THE NUMBER OF PARKING SPACES SHOWN IN THE PARKING | | | STUDY DOES NOT CORRESPOND TO THE NUMBER OF SPACES SHOWN | | | IN THE VARIOUS LOTS AS WELL AS THE NUMBERS IN THE | | | MASTER PLAN DATA TABLE. | | | | | | 4.3. THE METHODOLOGY APPEARS TO HAVE CHANGED SOMEWHAT | | | SINCE THE INCEPTION OF THE PARKING STUDY REQUIREMENT. | | | | | | 4.4. LEASES APPEAR TO BE EXPIRED BUT ARE STILL BE | | | UTILIZED FOR THE PARKING AVAILABILITY. | | | | | | 4.5. SPACES ARE BEING LEASED FROM LOCATIONS THAT APPEAR | | | TO NOT HAVE EXCESS PARKING AVAILABLE. | | | | | | 5. PLEASE PROVIDE INFORMATION SHOWING COMPLIANCE WITH | | | THE OVERALL MASTER PLAN FAR REQUIREMENT. | | | | | | 6. GENERATOR ENCLOSURE. | | | | | | 7. IRRIGATION PLANS DO NOT MATCH THE LANDSCAPE/SITE | | | PLAN. | | | | | | 8. ARCHITECTURAL ELEVATIONS INDICATE POTENTIAL BANNER | | | SIGNAGE ??? THE MASTER SIGN PLAN WOULD HAVE TO BE | | | AMENDED. | | | | | | 9. PLEASE PROVIDE ELEVATION POINTS ON THE SITE PLAN | | | AND/OR CROSS SECTIONS WITH ELEVATIONS SPECIFICALLY | | | INDICATING COMPLIANCE WITH THE MAXIMUM ENCROACHMENT | | | PERMITTED INTO THE REQUIRED SETBACKS. STEPS, STAIRS, | | | RAMPS, ETC. THAT ARE THREE (3) FEET OR LESS CAN | | | ENCROACH INTO THE SETBACK UP TO TWO (2) FEET FROM THE | | | PROPERTY LINE. STEPS, STAIRS, RAMPS, ETC. IN EXCESS OF | | | THREE (3) FEET HAVE TO COMPLY WITH THE BUILDING SETBACK | | | REQUIREMENTS. | | | | | | 10. STAFF WOULD LIKE TO HAVE DISCUSSION REGARDING THE | | | SOUTH DROP OFF AREA, THE PINCH POINT IN THE SIDEWALK | | | CREATED BETWEEN THE DROP OFF AND GRUBER PLACE, AS WELL | | | AS SOME OTHER AREAS THAT ARE BEING SHOWN AS | | | PAVER/SIDEWALK THAT DON???T SEEM FUNCTIONAL (I.E. AREA | | | WEST OF DUMPSTER ENCLOSURES). | | | ________________________________________ | | | | | | PLEASE NOTE THE FOLLOWING WHEN RESUBMITTING: | | | | | | A) WRITTEN RESPONSES TO COMMENTS MADE BY ALL | | | DEPARTMENTS SHALL BE PROVIDED UPON RESUBMISSION. | | | | | | B) ELECTRONIC (PDF) COPIES OF ALL PLANS AND/OR | | | DOCUMENTS SHALL BE PROVIDED. | | | | | | C) PLEASE NOTE THAT RE-SUBMITTALS MAY BE SUBJECT TO | | | ADDITIONAL COMMENTS. | | | | | | D) IF NO RESPONSE IS RECEIVED WITHIN 60 DAYS OF THE | | | ISSUANCE OF THESE COMMENTS, THE APPLICATION WILL BE | | | CONSIDERED WITHDRAWN AND ANY FURTHER ACTION WILL | | | REQUIRE SUBMISSION OF A NEW DEVELOPMENT APPLICATION. | | | | | | E) PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20% OF THE ORIGINAL APPLICATION FEE. | | | | | | F) IN ORDER TO BE CONSIDERED FOR THE FEBRUARY 22, 2023, | | | PLANNING BOARD AGENDA, ALL COMMENTS SHALL BE | | | SATISFACTORILY ADDRESSED. PLEASE SUBMIT ALL REVISED | | | DOCUMENTS/PLANS NO LATER THAN FRIDAY, DECEMBER 23, | | | 2022. | | | | | | G) TO BE PLACED ON THE FEBRUARY 22, 2023, PLANNING | | | BOARD AGENDA, SIGNS SHALL BE POSTED ON THE PROPERTY NO | | | LATER THAN FEBRUARY 7, 2022. SIGNAGE SHALL CONFORM, AND | | | BE INSTALLED ACCORDING TO THE REQUIREMENTS OF THE | | | CITY???S ZONING AND LAND DEVELOPMENT REGULATIONS; SUCH | | | REQUIREMENTS ARE ALSO PROVIDED IN THE DEVELOPMENT | | | APPLICATION. A SIGNED AND NOTARIZED AFFIDAVIT SHALL BE | | | PROVIDED BY THE DEADLINE REFERENCED ABOVE. | | | | | | H) IF AFTER THE CASE HAS BEEN ADVERTISED THE APPLICANT | | | DESIRES TO REQUEST A CONTINUANCE, A FEE OF $50 PLUS THE | | | COST OF ADVERTISING WILL BE CHARGED. | | | ________________________________________ | | | | | | QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING: | | | | | | JOHN P. ROACH, AICP, PRINCIPAL PLANNER | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES DEPARTMENT ??? PLANNING DIVISION | | | 401 CLEMATIS STREET - P.O. BOX 3147 | | | WEST PALM BEACH, FLORIDA 33402 | | | | | | P: 561.822.1448 | | | TTY: 800.955.8771 | | | E: [email protected] | | | | | | W: WPB.ORG | | | |
|
|
| |
Print |
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |