Plan Review Details - Project Z22100013
Plan Review Stops For Project Z22100013
Review Stop AIPP ART IN PUBLIC PLACES
Rev No 1 Status N Date 07-11-2023 Cont ID  
Sent By swelter Date 07-11-2023 Time 15:38 Rev Time 0.00
Received By swelter Date 07-11-2023 Time 15:38 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 07-12-2023 Cont ID  
Sent By rbrown Date 07-12-2023 Time 21:30 Rev Time 0.00
Received By rbrown Date 07-12-2023 Time 21:30 Sent To  
Notes
2023-07-12 21:32:23NO COMMENTS ON THE SITE PLAN FOR THE PROPOSED EXTENSION
 OF EXISTING DOCK.

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status P Date 07-12-2023 Cont ID  
Sent By lquinone Date 07-12-2023 Time 09:14 Rev Time 0.00
Received By lquinone Date 07-12-2023 Time 09:14 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 07-07-2023 Cont ID  
Sent By pleduc Date 07-07-2023 Time   Rev Time 0.00
Received By pleduc Date 07-07-2023 Time 14:18 Sent To  
Notes
2023-07-07 14:19:11FIRE HAS NO OBJECTIONS TO THE PROPOSED AND APPROVES.
  
 FIRE'S APPROVAL OF THIS SUBMITTED PROJECT MAY NOT
 CONSTITUTE IT'S FINAL REVIEW OR APPROVAL.
  
 IF APPLICABLE, FIRE SHALL REVIEW ALL SUBMITTED PROJECT
 PLANS AT THE APPLICABLE TIME AND IN ACCORDANCE WITH THE
 REQUIREMENTS OF ALL APPLICABLE FIRE CODES AND
 STANDARDS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop L LANDSCAPING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PARK PARKING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop POLICE POLICE
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PU PUBLIC UTILITIES
Rev No 1 Status P Date 07-13-2023 Cont ID  
Sent By relizond Date 07-13-2023 Time 12:15 Rev Time 0.00
Received By relizond Date 07-13-2023 Time 12:19 Sent To  
Notes
2023-07-13 12:15:27 
  

Review Stop PU-CS PUBLIC UTILITIES CUSTOMER SRVC
Rev No 1 Status P Date 07-12-2023 Cont ID  
Sent By mhurley Date 07-12-2023 Time 16:41 Rev Time 0.00
Received By mhurley Date   Time   Sent To  
Notes
***NONE***

Review Stop PW PUBLIC WORKS
Rev No 1 Status P Date 07-06-2023 Cont ID  
Sent By jbjoseph Date 07-06-2023 Time 12:36 Rev Time 0.00
Received By jbjoseph Date 07-06-2023 Time 12:37 Sent To  
Notes
***NONE***

Review Stop STORM STORMWATER
Rev No 2 Status P Date 07-27-2023 Cont ID  
Sent By tward Date 07-27-2023 Time 17:12 Rev Time 0.00
Received By tward Date 07-27-2023 Time 17:18 Sent To  
Notes
2023-07-27 17:15:35ATTORNEY B. ELEANOR HALPERIN SUBMITTED A RESPONSE
 LETTER INDICATING BOTH BOAT LIFTS ARE TO BE RELOCATED,
 THE ACOE HAS A SPECIAL PERMIT EXTENSION PROVISION AND
 THAT AN APPLICATION HAS BEEN SUBMITTED TO ACOE TO
 MODIFY PERMIT TO INCLUDE THE LATEST DOCK DESIGN PLANS.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  

Review Stop STORM STORMWATER
Rev No 1 Status F Date 07-13-2023 Cont ID  
Sent By tward Date 07-13-2023 Time 07:43 Rev Time 0.00
Received By tward Date 07-13-2023 Time 07:44 Sent To  
Notes
2023-07-13 07:44:27THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. THE JUSTIFICATION STATEMENT INDICATED BOTH EXISTING
 BOAT LIFTS WOULD BE RELOCATED TO DEEPER WATERS. THE
 CONSTRUCTION DRAWINGS SHOW ONLY THE LARGER BOAT LIFT
 BEING RELOCATED TO THE DOCK EXTENSION AND THE SMALLER
 BOAT EXTENSION REMAINING IN ITS CURRENT LOCATION.
 PLEASE EXPLAIN THE DISCREPANCY.
  
 2. THE ACOE PERMIT THAT WAS SUBMITTED HAS A TIME LIMIT
 FOR COMPLETING THE AUTHORIZED WORK BY MARCH 27, 2023.
 SUBMIT A VALID ACOE PERMIT PRIOR TO START OF
 CONSTRUCTION.
  
 3. THE PLANS ATTACHED TO THE ACOE PERMIT SHOW THE DOCK
 EXTENSION CONTINUING IN-LINE WITH THE EXISTING DOCK.
 THE CONSTRUCTION PLANS SHOW THE DOCK EXTENSION BEING
 OFFSET TO THE NORTH FROM THE EXISTING DOCK. MODIFY THE
 ACOE PERMIT TO INCLUDE THE CURRENT DOCK EXTENSION
 LAYOUT AND BOAT LIFT LOCATIONS.
  

Review Stop SURVEY SURVEYING
Rev No 1 Status P Date 07-10-2023 Cont ID  
Sent By vnoel Date 07-10-2023 Time 09:33 Rev Time  
Received By vnoel Date   Time   Sent To  
Notes
***NONE***

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status P Date 07-13-2023 Cont ID  
Sent By   Date 07-13-2023 Time   Rev Time  
Received By   Date 07-13-2023 Time   Sent To  
Notes
2023-07-13 05:45:27NO COMMENTS
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop Z ZONING
Rev No 2 Status P Date 07-18-2023 Cont ID  
Sent By vbroglia Date 07-18-2023 Time 12:32 Rev Time 0.00
Received By vbroglia Date 07-18-2023 Time 12:32 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 10-20-2022 Cont ID  
Sent By llouie Date 10-20-2022 Time   Rev Time  
Received By llouie Date 10-20-2022 Time   Sent To  
Notes
2022-10-20 11:23:15THE FOLLOWING COMMENTS ARE RELATED TO STAFF'S
 SUFFICIENCY REVIEW OF THE APPLICATION. THE APPLICATION
 HAS BEEN DEEMED INSUFFICIENT. ALL COMMMENTS BELOW MUST
 BE ADDRESSED FOR STAFF TO COMMENCE THE FORMAL REVIEW OF
 THE APPLICATION:
  
 1.) SITE PLAN MUST CLEARLY SHOW THE PROJECTION LINES
 SHOWING THE PROPERTY DIVIDED INTO THIRDS AS EXTENDED
 INTO THE WATERWAY. ALL COMPONENTS, INCLUDING THE DOCK
 AND ALL MOORING-RELATED FACILITIES (I.E. BOATLIFTS,
 PILINGS, ETC.) SHALL BE LOCATED IN THE MIDDLE ONE-THIRD
 OF THE LOT AS EXTENDED INTO THE WATERWAY. THE SITE PLAN
 MUST EXTRACT THIS INFORMATION FROM THE SIGNED AND
 SEALED SURVEY AND SHOW THE LOCATION OF THE PROPOSED
 DOCK AND ASSOCIATED MOORING-RELATED FACILITIES WITHIN
 THE MIDDLE THIRD.
  
 2.) AS NOTED IN THE JUSTIFICATION STATEMENT, THE
 APPLICANT IS ONLY SEEKING ONE WAIVER (LENGTH OF THE
 DOCK) IN THE CLASS A SPECIAL USE PERMIT APPLICATION;
 HOWEVER, THE SITE PLAN MUST DEMONSTRATE COMPLIANCE WITH
 THE ZONING AND LAND DEVELOPMENT REGULATIONS (ZLDRS) TO
 VERIFY THAT ADDITIONAL WAIVERS ARE NOT NECESSARY. THE
 LOCATION OF THE BOATLIFTS ARE QUESTIONABLE AT THIS
 TIME.
  
 3.) IS THERE A COMPREHENSIVE SEA GRASS STUDY AND DEPTH
 ANALYSIS TO SUPPORT THE WAIVER REQUEST FOR THE
 EXTENSION? THE SEAGRASS AND DEPTH ARE NOTED IN THE
 JUSTIFICATION STATEMENT AS THE REASONS FOR THE CLASS A.
  
 4.) COMPLETE ENGINEERING PLANS ARE REQUIRED (NOT
 EXCERPTS).
  
 5.) PROVIDE SUPPORT LETTERS FROM THE ADJACENT NEIGHBORS
 TO THE NORTH AND SOUTH. SUPPORT FROM THE IMMEDIATE
 NEIGHBORS INDICATING THAT THERE ARE NO ISSUES WITH THE
 PROPOSED DOCK IS CRITICAL AND HIGHLY RECOMMENDED AS A
 PART OF THE APPLICATION SUBMISSION.
  
 6.) RESPONSES TO THE WAIVER STANDARDS ARE NOT PROVIDED
 (REFERENCE: 94-273(A)(2))
  
  
  
  