Plan Review Details - Project Z22090019
Plan Review Stops For Project Z22090019
Review Stop AIPP ART IN PUBLIC PLACES
Rev No 2 Status F Date 07-11-2023 Cont ID  
Sent By swelter Date 07-11-2023 Time 16:02 Rev Time 0.00
Received By swelter Date 07-11-2023 Time 17:03 Sent To  
Notes
2023-07-11 16:05:55DEVELOPMENT OVER $500,000 IS SUBJECT TO THE PUBLIC ART
 REQUIREMENT.
 PLEASE CONTACT SYBILLE WELTER AT [email protected] TO
 REVIEW THE REQUIREMENTS.
  

Review Stop AIPP ART IN PUBLIC PLACES
Rev No 1 Status F Date 10-11-2022 Cont ID  
Sent By swelter Date 10-11-2022 Time 13:59 Rev Time 0.00
Received By swelter Date 10-11-2022 Time 14:20 Sent To  
Notes
2022-10-11 14:00:53PUBLIC ART REQUIREMENT:
  
 TOTAL CONSTRUCTION COSTS OF THIS DEVELOPMENT ARE OVER
 $500,000 IT IS SUBJECT TO THE PUBLIC ART REQUIREMENT AS
 PER CITY ORDINANCE.
  
 OPTION 1: INSTALL ARTWORK ON THE DEVELOPMENT SITE
 VALUED IN AN AMOUNT NOT LESS THAN ONE PERCENT OF THE
 TOTAL CONSTRUCTION COSTS.
  
 FOR SITE PLAN APPROVAL PUBLIC ART NEEDS TO BE
 IDENTIFIED ON ALL THE SITE PLANS.
  
 OPTION 2: CONTRIBUTE AN AMOUNT EQUAL TO 75 PERCENT OF
 ONE PERCENT OF THE TOTAL CONSTRUCTION COSTS FOR DEPOSIT
 TO THE PUBLIC ART ACCOUNT.
  
 FOR EITHER OPTION A COMPLETED PUBLIC ART ASSESSMENT
 APPLICATION ALONG WITH EITHER THE ESCROW OF THE 1% OR
 IF CHOSEN OPTION 2 CONTRIBUTION INTO THE PUBLIC ART
 FUND IS REQUIRED AT TIME OF BUILDING PERMIT SUBMITTAL.
  
 CONTACT SYBILLE WELTER, ADMINISTRATOR OF PUBLIC ART &
 CULTURE AT [email protected] WITH FURTHER QUESTIONS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 07-12-2023 Cont ID  
Sent By rbrown Date 07-12-2023 Time 22:48 Rev Time 0.00
Received By rbrown Date 07-12-2023 Time 22:48 Sent To  
Notes
2023-07-12 22:49:04DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR THE BUILDING PERMIT APPLICATION.
  
 2. DEMOLITION OF THE EXISTING BUILDINGS. AN ASBESTOS
 SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT
 REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH
 COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963,
 OR BY EMAIL: [email protected]
  
 3. UNITY OF TITLE. FOR ANY BUILDING CROSSING A PROPERTY
 LINE, EITHER A RECORDED UNITY OF TITLE, OR SOME OTHER
 APPROVED LEGAL INSTRUMENT, SHALL BE INCLUDED WITH THE
 PERMIT APPLICATION, OR THE BUILDING MUST HAVE A FIRE
 WALL ALONG THE PROPERTY LINE, PER SECTION 202 OF
 FLORIDA BUILDING CODE, BUILDING, FIRE SEPARATION
 DISTANCE.
  
 4. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT,
 THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR
 THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT,
 AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE
 FLORIDA BUILDING CODE.
  
 5. BUILDING LOCATION RELATIVE TO THE PROPERTY LINE AND
 OTHER STRUCTURES. WHEN SUBMITTED FOR BUILDING PERMIT,
 COMPLIANCE WITH ALL BUILDING SEPARATION, PERCENTAGE OF
 OPENINGS AND OPENING PROTECTIVE REQUIREMENTS OF SECTION
 R302 OF FLORIDA BUILDING CODE (RESIDENTIAL).
  
 6. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS,
 GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND
 OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS,
 SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC.
  
 7. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND
 CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF
 CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL
 NEIGHBORING PROPERTIES. THE CONTRACTOR SHALL SUBMIT A
 CONSTRUCTION PARKING PLAN TO THE ENGINEERING SERVICES
 DEPARTMENT.
  
 8. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER
 AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY,
 INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE
 CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF
 NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION
 THAT MAY AFFECT THE USE OF THEIR PROPERTY.
  
 9. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT
 WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL
 HAVE A SEPARATE ADDRESS ASSIGNED BASED ON THE LOCATION
 OF THE BUILDING ENTRANCE. FOR STREET ADDRESSING,
 CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT
 (561) 805 6659, OR BY EMAIL: [email protected]
  
 10. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT
 TO ART LIFE ASSESSMENT UNDER THE CITY OF WEST PALM
 BEACH ART IN PUBLIC PLACES (AIPP) PROGRAM. FOR ADVICE
 ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP
 ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC
 PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL:
 [email protected]
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 10-12-2022 Cont ID  
Sent By rbrown Date 10-12-2022 Time 21:35 Rev Time 0.00
Received By rbrown Date 10-12-2022 Time 21:34 Sent To  
Notes
2022-10-12 21:41:36DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR THE BUILDING PERMIT APPLICATION.
  
 2. DEMOLITION OF THE EXISTING BUILDINGS. AN ASBESTOS
 SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT
 REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH
 COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963,
 OR BY EMAIL: [email protected]
  
 3. UNITY OF TITLE. FOR ANY BUILDING CROSSING A PROPERTY
 LINE, EITHER A RECORDED UNITY OF TITLE, OR SOME OTHER
 APPROVED LEGAL INSTRUMENT, SHALL BE INCLUDED WITH THE
 PERMIT APPLICATION, OR THE BUILDING MUST HAVE A FIRE
 WALL ALONG THE PROPERTY LINE, PER SECTION 202 OF
 FLORIDA BUILDING CODE, BUILDING, FIRE SEPARATION
 DISTANCE.
  
 4. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT,
 THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR
 THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT,
 AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE
 FLORIDA BUILDING CODE.
  
 5. BUILDING LOCATION RELATIVE TO THE PROPERTY LINE AND
 OTHER STRUCTURES. WHEN SUBMITTED FOR BUILDING PERMIT,
 COMPLIANCE WITH ALL BUILDING SEPARATION, PERCENTAGE OF
 OPENINGS AND OPENING PROTECTIVE REQUIREMENTS OF SECTION
 R302 OF FLORIDA BUILDING CODE (RESIDENTIAL).
  
 6. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS,
 GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND
 OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS,
 SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC.
  
 7. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND
 CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF
 CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL
 NEIGHBORING PROPERTIES.
  
 8. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER
 AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY,
 INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE
 CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF
 NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION
 THAT MAY AFFECT THE USE OF THEIR PROPERTY.
  
 9. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT
 WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL
 HAVE A SEPARATE ADDRESS ASSIGNED BASED ON THE LOCATION
 OF THE BUILDING ENTRANCE. FOR STREET ADDRESSING,
 CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT
 (561) 805 6659, OR BY EMAIL: [email protected]
  
 10. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT
 TO ART LIFE ASSESSMENT UNDER THE CITY OF WEST PALM
 BEACH ART IN PUBLIC PLACES (AIPP) PROGRAM. FOR ADVICE
 ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP
 ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC
 PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL:
 [email protected]
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 2 Status F Date 07-12-2023 Cont ID  
Sent By lquinone Date 07-12-2023 Time 16:55 Rev Time 0.00
Received By lquinone Date 07-12-2023 Time 16:55 Sent To  
Notes
2023-07-12 16:55:58COMMENTS FROM LINDA QUINONES-CINTRON, PROJECT
 COORDINATOR, ENGINEERING SERVICES AT [email protected]
 PLEASE PROVIDE RESPONSE LETTER WITH THE RESUBMITTAL.
  
 O PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY
 OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC
 RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF
 YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE
 MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL
 IN THE WPB ENGINEERING SERVICES DEPARTMENT AT
 [email protected] OR 561-494-1079 FOR FURTHER
 ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION
 ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD
 SURVEY, POT-HOLING, SOFT DIGS ETC.
 O PROVIDE EXISTING AND PROPOSED PERVIOUS AND IMPERVIOUS
 DATA.
  
 BACKFLOW ASSEMBLY AND METERS:
 O SHOW AND LABEL ANY EXISTING OR PROPOSED WATER
 SERVICES AND WATER METERS, ALONG WITH WHAT IS HAPPENING
 TO THEM.
 O SHOW EXISTING AND PROPOSED DEDICATED UTILITY
 EASEMENTS TO ALLOW ACCESS FOR CITY PERSONNEL TO
 PROPOSED UTILITY WATER METERS. VERIFY THAT THERE ARE NO
 STRUCTURES WITHIN EASEMENT.
 O PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED LOCATION
 OF WATER METER AND BACKFLOW
 PREVENTION.
 O BACKFLOWS SHALL BE INSTALLED ON PRIVATE PROPERTY
 OUTSIDE OF EASEMENTS AND RIGHTS OF WAY. DOMESTIC WATER
 METERS SHALL BE INSTALLED IMMEDIATELY ADJACENT TO
 PROPERTY LINE. 3 INCH AND LARGER WATER METERS SHALL BE
 INSTALLED ABOVE-GROUND ONLY.
 O CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA (MAKE
 NOTE USC APPROVED) AND FIRE BACKFLOW PREVENTER AS DCDA.
  
 WATER/WASTEWATER PLAN:
 O PLANS SHALL SHOW EXISTING AND PROPOSED LOCATIONS AND
 DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND
 SEWER LINES AND CLEANOUTS, INCLUDING STUBS TO EACH
 PROPERTY LINE FOR WATER AND SANITARY SEWERS, THE MAKE
 AND MODEL OF ALL VALVES, POTABLE AND IRRIGATION METERS,
 BACKFLOWS, FIRE HYDRANTS AND FDCS, AND OTHER DEVICES TO
 BE INSTALLED ON THE SYSTEM, CATCH BASINS, CULVERTS,
 DITCHES INCLUDING GRADES, PIPES SIZES, MATERIALS,
 ELEVATIONS, ASSUMPTIONS, CALCULATIONS, INVERT
 ELEVATIONS FOR ALL INLETS AND MANHOLES AND PROFILES OF
 SANITARY SEWER LINES.
 O GATE VALVE BOXES SHALL NOT BE INSTALLED IN CURB OR
 SIDEWALK. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE
 PROFILE VIEW.
 O PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED
 UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC,
 ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION
 FACILITIES INCLUDING PIPE SIZE AND MATERIAL LOCATED IN
 THE RIGHT-OF-WAY.
 O PROVIDE PROFILE AND CLEARANCES BETWEEN WATER, SEWER
 AND STORM LINES PER CITY OF WEST PALM BEACH STANDARD
 DETAIL GN-2 SERIES, AT ALL UTILITY CROSSINGS. PLEASE
 INCLUDE FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES INCLUDING PIPE SIZE AND
 MATERIAL LOCATED IN THE RIGHT-OF-WAY.
 O PROVIDE FIRE FLOW TEST DATA.
 O PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND
 STORMWATER INFRASTRUCTURE ALONG ENTIRE PROJECT FRONTAGE
 (CONDITION OF SITE PLAN APPROVAL).
 O CUT AND CAP UTILITIES NOT IN USE AND REMOVE ANY
 ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY
 ROW.
 O WHEN PROPOSED, WATER MAINS IN CITY RIGHT OF WAY SHALL
 BE MADE OF DUCTILE IRON PIPE (NOT PVC) AND SPECIFY
 PROPOSED LENGTH IN FEET.
 O CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY
 SEWER ARE REQUIRED.
 O PROVIDE CLEANOUTS FOR PROPOSED SANITARY LINE ONSITE
 JUST INSIDE PROPERTY LINE, AT JOINTS AND EVERY 75 FEET.
 O ADD NOTE TO PLANS SPECIFYING CITY???S DOWNSTREAM LIFT
 STATION NUMBER.
 O PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR
 PROPOSED SANITARY LATERALS.
 O LABEL WATER LINES AS PRIVATE WHERE APPLICABLE.
 O PLEASE SHOW AND LABEL EXISTING AND PROPOSED GREASE
 TRAPS (IF ANY).
 O PER CITY STANDARDS MAINTAIN MINIMUM DISTANCE BETWEEN
 OUTSIDE DIAMETER OF CITY PIPE AND ROOT BARRIER.
  
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status F Date 09-26-2022 Cont ID  
Sent By rrossano Date 09-26-2022 Time   Rev Time  
Received By rrossano Date 09-26-2022 Time   Sent To  
Notes
2022-09-26 13:31:36COMMENTS FROM RICK ROSSANO, SR. PROJECT COORDINATOR,
 ENGINEERING SERVICES AT 561-494-1098 [email protected]
 GENERAL:
 O PLEASE RESPOND TO ALL COMMENTS IN WRITING, AND
 INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER
 (Z-XXXXXXXX).
 O THE CITY OF WEST PALM BEACH HAS A NUMBER OF
 REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY
 AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND
 WASTEWATER UTILITIES WITHIN THE CITY. PLEASE SEE
 DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AT THE LINK
 BELOW:
 A. HTTP://WPB.ORG/CMSPAGES/GETAMAZONFILE.ASPX?PATH=~\WP
 B_WEBSITE\MEDIA\ENGINEERING\DEVELOPMENT-APPLICATION-FUL
 L-PACKAGE_2016.PDF&HASH=7BD4DD7EB6115181D8C5977BCC02A97
 B1960045731D3658206F27451722716EF
 B. THIS AND OTHER RELATED ENGINEERING DOCUMENTS CAN BE
 FOUND HERE:
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
 C. ALSO SEE: CODE OF ORDINANCES, CITY OF WEST PALM
 BEACH, FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08,
 ADOPTED SEPT. 22, 2008. (SUPPLEMENT NO. 18)
 CHAPTER 90 UTILITIES, ARTICLE I. IN GENERAL,
 SEC. 90-7. POLICY REGARDING EXTENSION OF WATER OR SEWER
 SERVICE FACILITIES OF THE CITY.
 THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE
 CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY
 BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS,
 BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION.
 O AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR
 MORE INFORMATION, REFER TO THE LINK BELOW:
 A. HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PU
 BLICATIONS/BACKFLOW-CROSS-CONNECTION- CONTROL-MANUAL
 O PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY
 OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC
 RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF
 YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE
 MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL
 IN THE WPB ENGINEERING SERVICES DEPARTMENT AT
 [email protected] OR 561-494-1079 FOR FURTHER
 ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION
 ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD
 SURVEY, POT-HOLING, SOFT DIGS ETC.
 O PROVIDE EXISTING AND PROPOSED PERVIOUS AND IMPERVIOUS
 DATA.
  
 BACKFLOW ASSEMBLY AND METERS:
 O SHOW AND LABEL ANY EXISTING OR PROPOSED WATER
 SERVICES AND WATER METERS, ALONG WITH WHAT IS HAPPENING
 TO THEM.
 O SHOW EXISTING AND PROPOSED DEDICATED UTILITY
 EASEMENTS TO ALLOW ACCESS FOR CITY PERSONNEL TO
 PROPOSED UTILITY WATER METERS. VERIFY THAT THERE ARE NO
 STRUCTURES WITHIN EASEMENT.
 O PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED LOCATION
 OF WATER METER AND BACKFLOW
 PREVENTION.
 O BACKFLOWS SHALL BE INSTALLED ON PRIVATE PROPERTY
 OUTSIDE OF EASEMENTS AND RIGHTS OF WAY. DOMESTIC WATER
 METERS SHALL BE INSTALLED IMMEDIATELY ADJACENT TO
 PROPERTY LINE. 3 INCH AND LARGER WATER METERS SHALL BE
 INSTALLED ABOVE-GROUND ONLY.
 O CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA (MAKE
 NOTE USC APPROVED) AND FIRE BACKFLOW PREVENTER AS DCDA.
  
 WATER/WASTEWATER PLAN:
 O PROVIDE VERTICAL DATUM AND DATUM CONVERSION
 INFORMATION (NAVD 1988 AND NGVD 1929).
 O SHOW PROJECT ADDRESS ON ALL PLAN SHEETS.
 O PROVIDE LEGEND ON ALL PLAN SHEETS TO INCLUDE
 STREETLIGHT, SIGN POSTS, TRANSFORMER BOXES ETC.
 O PLANS SHALL SHOW EXISTING AND PROPOSED LOCATIONS AND
 DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND
 SEWER LINES AND CLEANOUTS, INCLUDING STUBS TO EACH
 PROPERTY LINE FOR WATER AND SANITARY SEWERS, THE MAKE
 AND MODEL OF ALL VALVES, POTABLE AND IRRIGATION METERS,
 BACKFLOWS, FIRE HYDRANTS AND FDCS, AND OTHER DEVICES TO
 BE INSTALLED ON THE SYSTEM, CATCH BASINS, CULVERTS,
 DITCHES INCLUDING GRADES, PIPES SIZES, MATERIALS,
 ELEVATIONS, ASSUMPTIONS, CALCULATIONS, INVERT
 ELEVATIONS FOR ALL INLETS AND MANHOLES AND PROFILES OF
 SANITARY SEWER LINES.
 O GATE VALVE BOXES SHALL NOT BE INSTALLED IN CURB OR
 SIDEWALK. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE
 PROFILE VIEW.
 O DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN
 VIEW FOR ALL SANITARY AND STORM SEWERS.
 O SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL.
 O PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED
 UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC,
 ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION
 FACILITIES INCLUDING PIPE SIZE AND MATERIAL LOCATED IN
 THE RIGHT-OF-WAY.
 O PROVIDE PROFILE AND CLEARANCES BETWEEN WATER, SEWER
 AND STORM LINES PER CITY OF WEST PALM BEACH STANDARD
 DETAIL GN-2 SERIES, AT ALL UTILITY CROSSINGS. PLEASE
 INCLUDE FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES INCLUDING PIPE SIZE AND
 MATERIAL LOCATED IN THE RIGHT-OF-WAY.
 O SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE DIRECTLY
 TO ENGINEERING (SHEET 33 OF CITY OF WPB DEVELOPMENT
 APPLICATION). PROVIDE CALCULATIONS ON PLANS OF EXISTING
 AND PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE,
 MAXIMUM AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS
 SHALL BE PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008
 FOR WATER.
 O PROVIDE FIRE FLOW TEST DATA.
 O PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND
 STORMWATER INFRASTRUCTURE ALONG ENTIRE PROJECT FRONTAGE
 (CONDITION OF SITE PLAN APPROVAL).
 O CUT AND CAP UTILITIES NOT IN USE AND REMOVE ANY
 ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY
 ROW.
 O WHEN PROPOSED, WATER MAINS IN CITY RIGHT OF WAY SHALL
 BE MADE OF DUCTILE IRON PIPE (NOT PVC) AND SPECIFY
 PROPOSED LENGTH IN FEET.
 O CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY
 SEWER ARE REQUIRED.
 O PROVIDE CLEANOUTS FOR PROPOSED SANITARY LINE ONSITE
 JUST INSIDE PROPERTY LINE, AT JOINTS AND EVERY 75 FEET.
 O ADD NOTE TO PLANS SPECIFYING CITY???S DOWNSTREAM LIFT
 STATION NUMBER.
 O PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR
 PROPOSED SANITARY LATERALS.
 O LABEL WATER LINES AS PRIVATE WHERE APPLICABLE.
 O PLEASE SHOW AND LABEL EXISTING AND PROPOSED GREASE
 TRAPS (IF ANY).
 O PER CITY STANDARDS MAINTAIN MINIMUM DISTANCE BETWEEN
 OUTSIDE DIAMETER OF CITY PIPE AND ROOT BARRIER.
  
 FORMAL ENGINEERING REVIEW:
 O FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND NPDES
 NOI REQUIREMENTS WILL BE ENFORCED.
 - AN NOI IS REQUIRED FOR PROJECTS THAT:
 - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS
 THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF
 DEVELOPMENT OR SALE;
 - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE
 STATE OR TO SURFACE WATERS OF THE STATE THROUGH A
 MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4).
 - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF
 CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION
 THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL
 SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT
 OF THE 10-2 CERTIFICATION.
 O FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 EASEMENT FOR PLACEMENT OF PROPOSED WATER METERS.
 O FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES OF
 WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS.
 O FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING
 APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT
 SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING
 SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED
 LEAD-FREE DESIGN.
 O FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY LINES
 ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY
 LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT
 PARCELS.
 O FOR FORMAL ENGINEERING SUBMITTAL, IF WATER LINES ARE
 BEING REPLACED IN ROW, SHOW ADJACENT PARCEL ADDRESSES.
 O FOR FORMAL ENGINEERING SUBMITTAL, ADD NOTE TO PROVIDE
 50 FT. PAVEMENT RESTORATION TRANSITION ON EACH SIDE OF
 PROPOSED TRENCH IN CITY MAINTAINED ROADWAY AREAS PER
 CITY OF WPB STANDARD DETAIL GC-8.
 O FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 CALCULATIONS OF PERVIOUS AND IMPERVIOUS AREAS FOR
 PROPOSED IMPROVED AREAS.
  
 QUESTIONS AND COORDINATION CONTACTS:
 O MARK HURLEY, FIELD CUSTOMER SERVICE SUPERVISOR WITH
 CITY OF WPB PUBLIC UTILITIES, REGARDING PLACEMENT OF
 BACKFLOW DEVICES AND WATER METERS. CONTACT HIM AT
 561-822-2262 OR [email protected]
 O MIKE TECHNOW, PROJECT ENGINEER, PUBLIC UTILITIES
 DEPARTMENT AT 561-494-1047 OR [email protected]
 O TRACY WARD, SR. STORMWATER ENGINEER, ENGINEERING
 SERVICES DEPT. AT 561-494-1120 OR [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 07-07-2023 Cont ID  
Sent By pleduc Date 07-07-2023 Time   Rev Time 0.00
Received By pleduc Date 07-07-2023 Time 16:07 Sent To  
Notes
2023-07-07 16:07:45THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC,
 FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM
 BEACH FIRE DEPARTMENT.
  
 THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE
 DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE.
 ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS
 ARE SUBMITTED FOR PERMIT.
  
 THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE
 PROPOSED PROJECT. THE FOLLOWING COMMENTS ARE INTENDED
 TO PROVIDE GUIDANCE FOR BUILDING PLAN SUBMITTAL.
  
 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY
 WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE
 PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A
 PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED
 TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN
 STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY
 MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER
 PROTECTION.
  
 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY
 IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING
 ALL CONSTRUCTION ACTIVITIES.
  
 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM
 ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION.
 ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND
 AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT
 WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS.
  
 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE
 REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE
 ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS.
  
 5. THE CONSTRUCTION OF THE BUILDING(S) SHALL COMPLY
 WITH THE 7TH EDITION OF THE FLORIDA FIRE PREVENTION
 CODE, INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE
 CODES.
  
 6. FOR PLAN REVIEW SUBMITTAL, PLEASE INCLUDE THE
 OCCUPANCY TYPE PER THE FLORIDA FIRE PREVENTION CODE.
  
 7. FOR PLAN REVIEW SUBMITTAL, PLEASE ENSURE THAT A FIRE
 LOAD CALCULATION IS INCLUDED, AND THAT ADEQUATE WATER
 SUPPLY IS EXISTING OR WILL BE PROVIDED.
  
 8. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS
 DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED
 ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF
 FIRE PREVENTION.
  
 ANY PROPOSED LOCATION OF THE FIRE HYDRANT AND FDC SHALL
 BE WITHIN 100' OF EACH OTHER AND CLOSELY COORDINATED
 WITH THE BUREAU OF FIRE PREVENTION.
  
 9. THERE ARE INDICATIONS OF A FIRE LINE FOR A PROPOSED
 FIRE SPRINKLER SYSTEM FOR THESE TOWNHOMES.
  
 FOR ANY LIFE SAFETY ENGINEERED SYSTEM, I.E FIRE
 SPRINKLER AND FIRE ALARM, ENSURE THEY COMPLY WITH THE
 REQUIREMENTS APPLICABLE NFPA CODE AND OF F.A.C. 61G AND
 SUBMITTED WITH THE MASTER PERMIT.
  
 9A. THE LOCATION OF ANY APPLICABLE DDCV AND FIRE LINE
 LOCATIONS SHALL MEET AND BE INSTALLED PER THE
 REQUIREMENTS OF NFPA 24(IF APPLICABLE) AND SHALL BE
 COORDINATED WITH THE OFFICE OF FIRE MARSHAL, THE CITY'S
 ENGINEERS OFFICE, THE LANDSCAPE PLANNER, AND THE CITY'S
 PLANNING AND ZONING OFFICE.
  
 10. COMPLETE LIFE SAFETY PLANS FOR THE OCCUPANCY SHALL
 BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL
 DISTANCES, EXIT SEPARATION DISTANCES, COMMON PATHS OF
 TRAVEL, DEAD-END CORRIDORS, EXIT SIGNS, EMERGENCY
 LIGHTING, EXITS LEADING TO A PUBLIC WAY, FIRE
 EXTINGUISHER LOCATIONS, AND ALL FIRE SAFETY FEATURES
 AND EQUIPMENT.
  
 11. IT IS HIGHLY RECOMMENDED (REQUIRED WITH FIRE
 SPRINKLER SYSTEM) THAT A KNOX BOX WITH KEYS FOR ENTRY
 DOOR LOCKS BE PROVIDED FOR 24 HOUR EMERGENCY ACCESS.
  
 12. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT
 DOES NOT CONSTITUTE ITS FINAL REVIEW OR APPROVAL.
  
 13. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING
 PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH
 THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 09-29-2022 Cont ID  
Sent By pleduc Date 09-29-2022 Time 14:40 Rev Time 0.00
Received By pleduc Date 09-29-2022 Time 14:32 Sent To  
Notes
2022-09-29 14:39:20THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC,
 FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM
 BEACH FIRE DEPARTMENT.
  
 THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE
 DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE.
 ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS
 ARE SUBMITTED FOR PERMIT.
  
 THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE
 PROPOSED PROJECT. THE FOLLOWING COMMENTS ARE INTENDED
 TO PROVIDE GUIDANCE FOR BUILDING PLAN SUBMITTAL.
  
 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY
 WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE
 PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A
 PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED
 TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN
 STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY
 MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER
 PROTECTION.
  
 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY
 IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING
 ALL CONSTRUCTION ACTIVITIES.
  
 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM
 ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION.
 ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND
 AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT
 WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS.
  
 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE
 REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE
 ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS.
  
 5. THE CONSTRUCTION OF THE BUILDING(S) SHALL COMPLY
 WITH THE 7TH EDITION OF THE FLORIDA FIRE PREVENTION
 CODE, INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE
 CODES.
  
 6. FOR PLAN REVIEW SUBMITTAL, PLEASE INCLUDE THE
 OCCUPANCY TYPE PER THE FLORIDA FIRE PREVENTION CODE.
  
 7. FOR PLAN REVIEW SUBMITTAL, PLEASE ENSURE THAT A FIRE
 LOAD CALCULATION IS INCLUDED, AND THAT ADEQUATE WATER
 SUPPLY IS EXISTING OR WILL BE PROVIDED.
  
 8. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS
 DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED
 ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF
 FIRE PREVENTION.
  
 ANY PROPOSED LOCATION OF THE FIRE HYDRANT AND FDC SHALL
 BE WITHIN 100' OF EACH OTHER AND CLOSELY COORDINATED
 WITH THE BUREAU OF FIRE PREVENTION.
  
 9. THERE ARE INDICATIONS OF A FIRE LINE FOR A PROPOSED
 FIRE SPRINKLER SYSTEM FOR THESE TOWNHOMES.
  
 FOR ANY LIFE SAFETY ENGINEERED SYSTEM, I.E FIRE
 SPRINKLER AND FIRE ALARM, ENSURE THEY COMPLY WITH THE
 REQUIREMENTS APPLICABLE NFPA CODE AND OF F.A.C. 61G AND
 SUBMITTED WITH THE MASTER PERMIT.
  
 9A. THE LOCATION OF ANY APPLICABLE DDCV AND FIRE LINE
 LOCATIONS SHALL MEET AND BE INSTALLED PER THE
 REQUIREMENTS OF NFPA 24(IF APPLICABLE) AND SHALL BE
 COORDINATED WITH THE OFFICE OF FIRE MARSHAL, THE CITY'S
 ENGINEERS OFFICE, THE LANDSCAPE PLANNER, AND THE CITY'S
 PLANNING AND ZONING OFFICE.
  
 10. COMPLETE LIFE SAFETY PLANS FOR THE OCCUPANCY SHALL
 BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL
 DISTANCES, EXIT SEPARATION DISTANCES, COMMON PATHS OF
 TRAVEL, DEAD-END CORRIDORS, EXIT SIGNS, EMERGENCY
 LIGHTING, EXITS LEADING TO A PUBLIC WAY, FIRE
 EXTINGUISHER LOCATIONS, AND ALL FIRE SAFETY FEATURES
 AND EQUIPMENT.
  
 11. IT IS HIGHLY RECOMMENDED (REQUIRED WITH FIRE
 SPRINKLER SYSTEM) THAT A KNOX BOX WITH KEYS FOR ENTRY
 DOOR LOCKS BE PROVIDED FOR 24 HOUR EMERGENCY ACCESS.
  
 12. TWO-WAY RADIO COMMUNICATIONS ENHANCEMENT SYSTEMS.
  
 NFPA 1, CHAPTER 11, BUILDING SERVICES;
  
 11.10 TWO-WAY RADIO ENHANCEMENT SERVICES.
 11.10.1 IN ALL NEW AND EXISTING BUILDINGS, MINIMUM
 RADIO SIGNAL STRENGTH FOR FIRE DEPARTMENT
 COMMUNICATIONS SHALL BE MAINTAINED AT A LEVEL
 DETERMINED BY THE AHJ.
  
 CONTACT WILL NEED TO BE MADE TO MARK FILLA, PALM BEACH
 COUNTY PUBLIC SAFETY RADIO SYSTEMS MANAGER,
 [email protected], 561-233-0837; AS OUR RADIOS OPERATE
 ON THEIR SYSTEM FOR DETAILED RADIO FREQUENCY AND
 INSTALLATION INSTRUCTIONS.
  
 14. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT
 DOES NOT CONSTITUTE ITS FINAL REVIEW OR APPROVAL.
  
 15. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING
 PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH
 THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop L LANDSCAPING
Rev No 2 Status F Date 07-12-2023 Cont ID  
Sent By avolcy Date 07-12-2023 Time 17:58 Rev Time 0.00
Received By avolcy Date 07-12-2023 Time 17:58 Sent To  
Notes
2023-07-12 18:00:26LANDSCAPE PLAN REVIEW
 ________________________________________
  
 DATE OF REVIEW: 07.122023
 PRJECT NUMBER: Z22090019
 ________________________________________
  
 REVIEW STATUS: FAILED
 ________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. PRIOR TO THE REMOVAL OF ANY EXISTING TREES ON THE
 PROPERTY, A TREE ALTERATION PERMIT SHALL BE OBTAINED
 FROM THE DEVELOPMENT SERVICES DEPARTMENT PLANNING
 DIVISION. PLEASE CONTACT SMITH AMISIAL, LANDSCAPE
 PLANNER, AT 561.822.1562 OR [email protected]
  
 2. A SEPARATE LANDSCAPE PERMIT SHALL BE OBTAIN FOR
 INSTALLATION OF ALL LANDSCAPE MATERIAL REQUIRED BY
 ARTICLE XIV OF THE CITYS ZONING AND LAND DEVELOPMENT
 REGULATIONS.
  
 3. PROVIDE LOCATIONS AND SCREENING FOR ALL ABOVE GROUND
 UTILITY VALVES, BACKFLOW PREVENTERS, AND IRRIGATION
 BACKFLOWS.
  
 ________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 PLEASE NOTE THE FOLLOWING PROCESS COMMENTS WHEN
 RESUBMITTING:
 A. WRITTEN RESPONSES TO COMMENTS MADE BY ALL
 DEPARTMENTS SHALL BE PROVIDED UPON RESUBMISSION.
 B. PROVIDE AN ELECTRONIC COPY OF ALL PLANS AND REQUIRED
 MATERIALS AND 2 SETS OF FOLDED PHYSICAL PLANS, ALONG
 WITH ONE (1) REDUCED COPY (11 IN X 17 IN).
 C. PLEASE NOTE THAT RE-SUBMITTALS MAY BE SUBJECT TO
 ADDITIONAL COMMENTS.
 D. IF NO RESPONSE IS RECEIVED WITHIN 60 DAYS OF THE
 ISSUANCE OF THESE COMMENTS, THE APPLICATION WILL BE
 CONSIDERED WITHDRAWN AND ANY FURTHER ACTION WILL
 REQUIRE SUBMISSION OF A NEW DEVELOPMENT APPLICATION.
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 GAISHA (ANNE-CLERISSE) VOLCY, PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1552
 TTY: 800.955.8771
 E: [email protected]
  
 W: WPB.ORG
  

Review Stop L LANDSCAPING
Rev No 1 Status F Date 10-06-2022 Cont ID  
Sent By rcaranci Date 10-06-2022 Time 14:26 Rev Time 0.00
Received By rcaranci Date 10-06-2022 Time 14:26 Sent To  
Notes
2022-10-06 14:27:12FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: NOTTINGHAM TOWNHOMES Z22090019
 OCTOBER 6, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. THE SCALE OF THE LANDSCAPE PLAN NEEDS TO BE
 1???=20???IN ORDER TO PROVIDE THE DETAIL NEEDED.
  
 2. LOT LINES MUST BE CLEARLY SHOWN ON THE LANDSCAPE
 PLAN.
  
 3. PROVIDE A SEPARATE TREE DISPOSITION PLAN BASED ON
 THE TREE SURVEY. INCLUDE EXISTING TREES IN THE CITY
 RIGHT OF WAY. EXISTING TREES SHOULD BE REMOVED FROM THE
 LANDSCAPE PLAN UNLESS THEY ARE TO REMAIN.
  
 4. IF EACH UNIT IS TO BE A FEE SIMPLE SINGLE FAMILY
 LOT, THE LANDSCAPE REQUIREMENTS MUST BE SHOWN FOR EACH
 LOT PER SECTION 94-442(C)(2)A. BASED ON THE
 NON-BUILDING OPEN SPACE AREA OF EACH LOT.
  
 5. FOR EACH LOT, PALM SUBSTITUTION CANNOT EXCEED 35% OF
 THE REQUIRED TREES.
  
 6. THE TREE REQUIREMENTS CHART NEEDS TO BE REVISED TO
 SHOW CALCULATIONS FOR THE COMMON AREAS INCLUDING
 LANDSCAPE BUFFERS. THIS AREA ALSO NEEDS TO BE DEFINED
 AS TO OWNERSHIP AND MAINTENANCE THAT WILL BE THE
 RESPONSIBILITY OF THE PROPERTY OWNER???S ASSOCIATION
 REQUIRED TO BE FORMED.
  
 7. A 10 FOOT LANDSCAPE BUFFER IS SHOWN ON THE
 NOTTINGHAM PROPERTY LINE AND 5 FOOT LANDSCAPE BUFFERS
 ALONG THE OTHER PROPERTY LINES. MAKE SURE THIS IS
 REFLECTED CORRECTLY ON THE CHART.
  
 8. SEWER LINES ARE NOT CLEARLY LABELED WHERE THEY
 CONNECT ACROSS THE FRONT YARDS. THE PLACEMENT OF THE
 SEWER LINES IS TOO CLOSE TO TREES IN THE FRONT OF SOME
 LOTS REQUIRING ROOT BARRIER THAT CUTS OFF MOST OF THE
 POSSIBLE ROOT ZONE AREA. LINES MUST BE ADJUSTED TO
 AVOID CONFLICTS WITH APPROVED TREES.
  
 9. WATER AND FIRE LINES SHOW THE SAME ISSUES OF
 CONFLICTS WITH TREES IN SOME LOCATIONS. IF THE CIVIL
 ENGINEER COORDINATES WITH THE LANDSCAPE ARCHITECT,
 CONFLICTS CAN BE RESOLVED TO PROVIDE A SUSTAINABLE
 DESIGN.
  
 10. PROVIDE INFORMATION ON THE IRRIGATION SYSTEMS FOR
 EACH LOT AND THE COMMON AREA PARCELS. INDICATE IF EACH
 UNIT WILL HAVE A SEPARATE SYSTEM OR IF IT WILL BE ONE
 COMMON SYSTEM.
 11. PROVIDE LOCATIONS AND SCREENING FOR ALL ABOVE
 GROUND UTILITY VALVES, BACKFLOW PREVENTERS, AND
 IRRIGATION BACKFLOWS.
  
 12. PROVIDE THE FLORIDA FRIENDLY REQUIREMENTS AND
 POINTS FOR EACH LOT AND THE COMMON AREA PARCEL
 SEPARATELY. 25 POINTS ARE REQUIRED FOR SINGLE FAMILY
 LOTS.
  
 13. STAFF SUGGESTS THAT THE SHADE TREES FOR THE
 SIDEWALK BE PROVIDED ON THE COMMON AREA ADJACENT TO THE
 SIDEWALK AND NOT IN THE PARKWAY AS IT IS TOO NARROW TO
 SUPPORT A SHADE TREE. THE SILVER BUTTONWOOD TREES ARE
 OF A SIZE THAT MAY INTERFERE WITH STREET AND SIDEWALK
 TRAFFIC.
 14. SHOW THE LOCATIONS OF OFFSITE TREE CANOPY WITHIN 10
 FEET OF THE PROPERTY LINE AND COORDINATE LOCATIONS OF
 PROPOSED TREES TO AVOID CONFLICT.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH
 THIS PETITION.
  
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF
 WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A
 SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  

Review Stop PARK PARKING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop POLICE POLICE
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PU PUBLIC UTILITIES
Rev No 2 Status F Date 07-13-2023 Cont ID  
Sent By relizond Date 07-13-2023 Time 12:48 Rev Time 0.00
Received By relizond Date 07-13-2023 Time 12:41 Sent To  
Notes
2023-07-13 12:48:22-DENOTE MATERIAL FOR ALL EXISTING UTILITIES
 -SHOW ALL EXISITING UTILITIES WITHIN PROJECT SCOPE
 -SHOW ALL LATERALS/SERVICES WITHIN PROJECT SCOPE
 -SHOW ALL VALVES AND APPURTENANCES FOR EXISTING AND
 PROPOSED UTILITIES LEGIBLY
 -LABEL ALL EXISTING DRY UTILTIES
 -FITTINGS NOT PERMITTED BETWEEN METER AND BACKFLOW PER
 STANDARD DETAILS
 -CALL OUT ALL MEANS OF CONNECTION
 -CALL OUT SIZE AND MATERIAL FOR ALL PROPOSED UTILTIES
 -VALVES SHOWN WITHOUT SERVICES
 -PROVIDE 5 FOOT RADIAL CLEARANCE FOR METER BOXES AND
 CLEANOUTS
 -LATERALS/SERVICES NOT TO BE USED REQUIRE REMOVAL UP TO
 THE MAIN
 -DENOTE CITY'S POINTS OF SERVICE
 -PROVIDE PROFILES FOR ALL CONNECTIONS FROM POINT OF
 CONNECTION TO THE POINT OF SERVICE
 -PROVIDE DEMAND CALCULATIONS IN ORDER TO ENSURE
 EXISTING PIPES CAN PROVIDE SUFFICIENT FLOW
 -DATUM CONVERSION MISSING
 SPECIFY DOWNSTREAM LIFTSTATION THAT SERVES THE PROJECT
 AREA
 -PROVIDE CROSSING INFORMATION FOR ALL UTILITIES
 -LATERALS LARGER THAN 6" WILL REQUIRE CONNECTION VIA
 MANHOLE, AS WELL AS A CLEANOUT OF CORRESPONDING SIZE AT
 R/W
 -SAMPLE POINTS REQUIRED
 -FDOH PERMITS REQUIRED
 -BLOW-UP DETAIL NEEDED FOR ALL CONNECTION

Review Stop PU PUBLIC UTILITIES
Rev No 1 Status F Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By mtechnow Date 10-13-2022 Time 11:12 Sent To  
Notes
2022-10-13 11:24:11-PLANS APPROVED ON A CONCEPTUAL LEVEL.
 -PLEASE REFERENCE THE SUBMITTAL CHECKLIST (PROVIDED BY
 RICK ROSSANO) FOR PLAN SUBMITTAL GUIDELINES IN ORDER TO
 PROCEED.
  
 MICHAEL TECHNOW [email protected]

Review Stop PU-CS PUBLIC UTILITIES CUSTOMER SRVC
Rev No 2 Status F Date 07-06-2023 Cont ID  
Sent By mhurley Date 07-06-2023 Time 11:20 Rev Time 0.00
Received By mhurley Date   Time   Sent To  
Notes
2023-07-06 11:20:14PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING:
 -LABEL FIRELINE BACKFLOW ASSEMBLIES WITH SIZE AND TYPE.
 -DID NOT SEE FDC. SHOW AND LABEL IF NEEDED OR REQUIRED.
 -LABEL WATER METERS WITH SIZE. IF SIZE IS 3 INCH OR
 LARGER, ADD ABOVE-GROUND TO LABEL.
 -NEAR NORTHEAST AREA OF PROPERTY, A FIRELINE PIPE MAY
 HAVE LOCATION CONFLICT WITH A STORMWATER STRUCTURE.
 -AT CALLOUT FOR EXISTING FIRE HYDRANT, ADD FIRE HYDRANT
 SYMBOL ON PLANS.
 -ADD WATER AND SEWER DEMAND CALCULATIONS TO SHEET C2.2
 -LABEL DOMESTIC BACKFLOW ASSEMBLIES WITH SIZE AND TYPE.
 -WILL IRRIGATION WATER RUN OFF THE DOMESTIC METERED
 WATER SERVICES?
 -SHOW UTILITIES FROM CIVIL PLANS ON LANDSCAPING PLANS
 AND ENSURE PLANTS AND UTILITIES ARE SUFFICIENTLY
 DISTANCED FROM EACH OTHER.
 -VERIFY PRIVATE FIRE SYSTEM WILL NOT HAVE ANY ADDED
 CHEMICALS OR AUXILIARY WATER SOURCES SUCH AS WELLS.
 -IF THERE WILL BE ANY OUTSIDE TRANSFORMER PADS, SHOW
 AND LABEL ON PLANS.
 RESPECTFULLY,
 MARK HURLEY [email protected]

Review Stop PU-CS PUBLIC UTILITIES CUSTOMER SRVC
Rev No 1 Status F Date 10-11-2022 Cont ID  
Sent By mhurley Date 10-11-2022 Time 08:02 Rev Time 0.00
Received By mhurley Date   Time   Sent To  
Notes
2022-10-11 08:02:49PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING:
  
 -CONSIDER ADDING GATE VALVE AT SOUTH SIDE OF PLUMBING
 HELP WITH TROUBLESHOOTING LEAKS AND MAINTENANCE.
  
 -LARGE METERS AND FIRELINE BACKFLOWS NEED TO BE OUTSIDE
 OF FENCES, GATES, OR WALLS AND ACCESSIBLE FROM RIGHT OF
 WAY. TREES SHOULD NOT BLOCK TRUCK CRANES FROM ACCESSING
 LARGE METERS.
  
 -PLUMBING SHOWN GOING THROUGH POSSIBLE POOL.
  
 -ARE ANY FDC NEEDED OR REQUIRED? IF SO, SHOW AND LABEL
 ON PLANS.
  
 -LABEL ON PLANS WHAT IS HAPPENING TO DO NOT PARK SIGNS
 NEAR NORTHEAST AREA OF PROPERTY.
  
 -ADD WATER AND SEWER DEMAND CALCS ON WATER AND
 WASTEWATER PLAN.
  
 -LARGE DOMESTIC BACKFLOW AND FIRELINE BACKFLOW STANDARD
 DETAILS MISSING. PLEASE ADD TO ENGINEERING PLAN SET.
  
 -HAVE GATES ON SOUTH PROPERTY LINE OPEN INWARD INSTEAD
 OF OUTWARD INTO CITY PROPERTY.
  
 -SURVEY SHOWS WOOD POWER POLES ON PROPERTY AND HISTORIC
 PICTURES SHOW OVERHEAD UTILITIES. WHAT IS HAPPENING TO
 THEM? ALSO ARE THERE ANY EXISTING UTILITY EASEMENTS FOR
 THOSE?
  
 -SHOW REMOVAL OF EXISTING SEWER LATERALS AND CLEANOUTS
 NEAR NORTH PROPERTY LINE AND RIGHT OF WAY ON WASTEWATER
 PLAN.
  
 -LABEL ADJACENT PROPERTY ADDRESSES TO THE SOUTH, EAST,
 AND WEST.
  
 -BACKFLOW ASSEMBLIES MAY NOT BE LOCATED IN SIDEWALKS
 BLOCKING PEDESTRIAN TRAFFIC.
  
 -LANDSCAPING PLAN DOES NOT SHOW PLANTS AND UTILITIES
 APPROPRIATELY DISTANCED FROM EACH OTHER.
  
 RESPECTFULLY,
  
 MARK HURLEY [email protected]
  

Review Stop PW PUBLIC WORKS
Rev No 2 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By jbjoseph Date 07-06-2023 Time 13:04 Sent To  
Notes
2023-07-06 13:05:06PLEASE PROVIDE THE FOLLOWING:
  1. LOCATION OF THE DUMPSTER ENCLOSURE
  2. DUMPSTER ENCLOSURE DETAILS FOR SANITATION SERVICE
 (I.E. SOLID WASTE CONTAINER(S) TYPE, COLLECTION
 LOCATION, ETC.). FOR A FREESTANDING SITE DUMPSTER
 ENCLOSURE. THE ENCLOSURE SHALL COMPLY WITH THE LATEST
 REVISION OF CITY OF WEST PALM BEACH GENERAL
 CONSTRUCTION GARBAGE ENCLOSURE STANDARD. GC-7
  3. LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE
 SOLID WASTE VOLUME PRODUCED ALONG WITH THE SIZE, TYPE
 AND QUANTITY OF THE CONTAINER (I.E. DUMPSTER/COMPACTOR)
 THAT WILL BE UTILIZED FOR THE SANITATION SERVICE.
  4. PLEASE PROVIDE AN AUTOTURN PLAN.?? TRAVEL PATHS
 SHOULD BEGIN OUTSIDE THE SITE ILLUSTRATING THE TURN
 ONTO THE PRIMARY ENTRY ROAD/DRIVE, MANEUVERING AROUND
 THE SITE, AND COMPLETED WITH AN ILLUSTRATION
 DEMONSTRATING EXITING THE SITE.
  PATHS MUST ILLUSTRATE THE FULL VEHICLE SWEPT PATH
 (INCLUDING WHEEL TRACKS AND OUT-TO-OUT VEHICLE OVERHANG
 SWEEP) AND MUST INDICATE A CLEAR, UNOBSTRUCTED TRAVEL
 AROUND THE SITE WITHOUT IMPACT/COLLISIONS TO BUILDINGS,
 CURBS, LANDSCAPING, PARKING SPACES, VEHICLES, ETC???
  
  AUTOTURN EXHIBIT WITH DYNAMIC ENVELOPE AND THE
 VEHICLE'S WHEEL PATH IDENTIFIED WITH DIFFERENT COLORS
 FOR THE SANITATION SERVICE, FRONT LOADER TRUCK WITH THE
 FOLLOWING SPECS:
  - DUAL AXLES
  - TRUCK LENGTH: 35 FT
  - TIRE PATH WIDTH: 8FT
  - DYNAMIC ENVELOPE WIDTH: 11 FT
  - TURNING RADIUS:
  - SAE TURNING RADIUS: 325FT
  - CURB TO CURB DIAMETER: 74 FT
  - WALL TO WAII DIAMETER: 86 3FT
  
  5. DESIGNATED LOCATION FOR THE BULK ITEM PICK UP AND
 RECYCLING CONTAINERS.
  6. IN CASE OF PROPOSING ADDITION OF ANY NEW CAN(S) IN
 THE CITY'S RIGHT OF WAY, THE LOCATION AND QUANTITY OF
 THE CAN(S) SHALL BE REVIEWED AND APPROVED BY THE PUBLIC
 WORKS DEPARTMENT AND THE CAN(S) SHALL BE TYPE, SIZE,
 AND COLOR APPROVED BY PUBLIC WORKS DEPARTMENT. THE
 BUILDING MAINTENANCE IS RESPONSIBLE TO MAINTAIN AND
 SERVICE THE CAN(S).
  7. ALL THE PARKING STALL PAINTING SHALL COMPLY WITH
 THE CITY MUNICIPAL CODE SECTION 94-485 AND FLORIDA
 STATUTES 553.5041
  8. ALL STRIPING AND SIGNAGE SHALL COMPLY WITH THE
 LATEST REVISION OF CITY OF WEST PALM BEACH STANDARD
 DETAILS AND MEET THE MUTCD LATEST EDITION
  9. ALL PAVEMENT MARKING, SIGNAGE, AND SIDEWALK DAMAGED
 DURING CONSTRUCTION SHALL BE RESTORED.
  
  BRUCELY A. JOSEPH
  PUBLIC WORKS PROGRAM MANAGER
  [email protected]
  561-494-1141
  

Review Stop PW PUBLIC WORKS
Rev No 1 Status F Date 10-06-2022 Cont ID  
Sent By   Date 10-06-2022 Time   Rev Time  
Received By   Date 10-06-2022 Time   Sent To  
Notes
2022-10-06 08:26:23PLEASE PROVIDE THE FOLLOWINGS:
 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID
 WASTE VOLUME PRODUCED ALONG WITH THE SIZE, TYPE AND
 QUANTITY OF THE CONTAINER (I.E. DUMPSTER/COMPACTOR)
 THAT WILL BE UTILIZED FOR THE SANITATION SERVICE.
 2- DETAILS FOR SANITATION SERVICE (I.E. SOLID WASTE
 CONTAINER(S) TYPE, COLLECTION LOCATION, ETC.). FOR A
 FREESTANDING SITE DUMPSTER ENCLOSURE, THE ENCLOSURE
 SHALL COMPLY WITH THE LATEST REVISION OF CITY OF WEST
 PALM BEACH GENERAL CONSTRUCTION-GARBAGE ENCLOSURE
 STANDARD, GC-7. (LINK TO THE LATEST REVISION OF THE
 GC-7 DOCUMENT: HTTPS://WWW.WPB.ORG/HOME/SHOWPUBLISHEDDO
 CUMENT/3690/637629060422100000)
 3- AUTOTURN EXHIBIT WITH DYNAMIC ENVELOPE AND THE
 VEHICLE???S WHEEL PATH IDENTIFIED WITH DIFFERENT COLORS
 FOR THE SANITATION SERVICE, FRONT LOADER TRUCK WITH THE
 FOLLOWING SPECS:
 - DUAL AXLES
 - TRUCK LENGTH: 35 FT
 - TRUCK WIDTH: 11 FT
 - TURNING RADIUS:
 - SAE TURNING RADIUS: 32.5 FT
 - CURB-TO-CURB DIAMETER: 74 FT
 - WALL-TO-WALL DIAMETER: 86.3 FT
 4- DESIGNATED LOCATION FOR THE BULK ITEM PICK UP AND
 RECYCLING CONTAINERS
 5- IN CASE OF PROPOSING ADDITION OF ANY NEW CAN(S) IN
 THE CITY`S RIGHT-OF-WAY , THE LOCATION AND QUANTITY OF
 THE CAN(S) SHALL BE REVIEWED AND APPROVED BY PUBLIC
 WORKS DEPARTMENT AND THE CAN(S) SHALL BE TYPE, SIZE AND
 COLOR APPROVED BY PUBLIC WORKS DEPARTMENT. THE BUILDING
 MAINTENANCE IS RESPONSIBLE TO MAINTAIN AND SERVICE THE
 CAN(S).
 6- ALL THE PARKING STALL PAINTING SHALL COMPLY WITH THE
 CITY`S MUNICIPAL CODE SECTION 94-485 AND FLORIDA
 STATUES [553.5041 F.S.].
 7- ALL STRIPING AND SIGNAGE SHALL COMPLY WITH THE
 LATEST CITY OF WEST PALM BEACH STANDARD DETAILS AND
 MEET THE M.U.T.C.D. LATEST EDITION.
 8- ALL PAVEMENT MARKING , SIGNING AND SIDEWALK DAMAGED
 DURING CONSTRUCTION SHALL BE RESTORED.
  
  
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045

Review Stop STORM STORMWATER
Rev No 2 Status F Date 07-13-2023 Cont ID  
Sent By tward Date 07-13-2023 Time 08:05 Rev Time 0.00
Received By tward Date 07-13-2023 Time 08:11 Sent To  
Notes
2023-07-13 08:06:38THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. PROVIDE CROSS SECTIONS FROM THE CENTERLINE OF THE
 RIGHT OF WAY AND FROM PROPERTY LINES TO THE FACE OF THE
 BUILDING AT EACH PROPERTY LINE. SHOW GRADE BREAKS, FLOW
 ARROWS, ETC. LABEL AND DIMENSION SURFACE FEATURES (CURB
 AND GUTTER, SIDEWALK, BUILDING, LANDSCAPE STRIPS,
 ETC.). PROVIDE DIMENSIONS FROM PROPERTY LINE TO EDGE OF
 PAVEMENT, BACK OF CURB, BACK OF SIDEWALK, FACE OF
 BUILDING.
  
 2. PROVIDE CROSS SECTION AT EACH DRIVEWAY. SHOW GRADE
 BREAKS, FLOW ARROWS, ETC. LABEL AND DIMENSION SURFACE
 FEATURES (CURB AND GUTTER, SIDEWALK, BUILDING,
 LANDSCAPE STRIPS, ETC.). PROVIDE DIMENSIONS FROM R/W TO
 EDGE OF PAVEMENT, BACK OF GUTTER, BACK OF SIDEWALK,
 FACE OF BUILDING. LABEL THE RIGHT OF WAY.
  
 3. PROVIDE A CROSS SECTION FOR THE DRIVEWAY AISLE
 BETWEEN THE BUILDINGS. LABEL TYPICAL CROSS SLOPES. WAS
 AN INVERTED CROWN CROSS SECTION CONSIDERED TO MOVE THE
 DRAINAGE STRUCTURES FURTHER AWAY FROM THE GARAGE
 ENTRANCES AND TO REDUCE THE NUMBER OF DRAINAGE
 STRUCTURES?
  
 4. THERE APPEARS TO BE AN EAST WEST SLOPE ALONG THE
 DRIVE AISLE (BETWEEN THE BUILDINGS) IN EXCESS OF 2
 PERCENT. THE CROSS SLOPE OF ANY PEDESTRIAN PATHS IN THE
 NORTH SOUTH DIRECTION WITHIN THIS AREA WILL NEED TO BE
 CHECKED TO SEE THAT IT DOES NOT EXCEED 2%.
  
 5. CREATE SWALES ALONG THE BACK OF SIDEWALK TO PREVENT
 DIRECT RUNOFF ONTO THE SIDEWALK.
  
 6. CREATE SWALES ALONG THE PROPERTY LINES TO PREVENT
 RUNOFF FROM FLOWING ONTO ADJACENT PROPERTIES.
  
 7. LABEL EXISTING UTILITIES (SIZE, MATERIAL) WITH THE
 RIGHT OF WAY.
  
 8. THE HEALTH DEPARTMENT DOES NOT ALLOW CONFLICT
 STRUCTURES BETWEEN WATER MAINS AND DRAINAGE STRUCTURES.
 ADJUST THE ALIGNMENT OF THE PROPOSED FIRE LINE TO AVOID
 DRAINAGE STRUCTURE S-107.
  
 9. CONSIDER THE USE OF PERVIOUS PAVERS TO REDUCE THE
 AMOUNT OF STORMWATER RUNOFF.
  
 10. SHOW THE UTILITIES ON THE LANDSCAPE PLANS.
 COORDINATE PLACEMENT OF TREES TO AVOID UTILITIES.
  
 11. SHOW MILL AND RESURFACING LIMITS WITHIN THE RIGHT
 OF WAY FOR THE PAVEMENT TRENCH CUTS.
  
 12. THE CURBING AROUND THE BULBOUTS ON EITHER END OF
 THE ON-STREET PARKING APPEAR TO BE FURTHER THAN THE
 EXISTING TYPE F CURB AND GUTTER.
  
 13. SHOW THE EXISTING CURB AND GUTTER AT THE WEST AND
 EAST END OF THE DEVELOPMENT AND HOW THE PROPOSED CURB
 AND GUTTER WILL TIE IN.
  
 14. PROVIDE DROP CURB AT THE NORTH SIDE OF THE ON
 STREET PARKING SPACES OR TYPE F CURB AND GUTTER AT THE
 BACK OF THE ON STREET PARKING SPACES. DESIGN THE SLOPE
 OF THE GUTTER TO FLOW TO EXISTING DRAINAGE STRUCTURES.
  
 15. DRIVEWAY APRONS TO BE CONCRETE WITHIN THE RIGHT OF
 WAY.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH
 THE ENGINEERING PERMIT SUBMITTAL. THE TRENCH DRAINS ALL
 APPEAR TO BE INTERCONNECTED SO THE DRAINAGE STRUCTURE
 WITH THE LOWEST RIM ELEVATION WILL DRIVE THE VALUE OF
 H2 IN THE EXFILTRATION TRENCH EQUATION.
  
 2. PROVIDE COPY OF SFWMD ERP AND FDEP NPDES
 CONSTRUCTION PERMIT BEFORE START OF CONSTRUCTION.
  
 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  

Review Stop STORM STORMWATER
Rev No 1 Status F Date 10-13-2022 Cont ID  
Sent By tward Date 10-13-2022 Time 00:01 Rev Time 0.00
Received By tward Date 10-13-2022 Time 00:02 Sent To  
Notes
2022-10-13 00:01:50THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. INCORPORATE THE IMPROVEMENTS MADE TO NOTTINGHAM
 BLVD. THE R/W MAY NEED TO BE RE-SURVEYED TO SHOW THE
 TYPE F CURB AND GUTTER AND NARROWED ASPHALT PAVEMENT.
 UTILITY AS-BUILT DRAWINGS MAY BE AVAILABLE TO DETERMINE
 IF THE PROPOSED SEWER MAIN CAN CROSS THE NEW WATER
 MAIN.
  
 2. PROVIDE CROSS SECTIONS FOR EACH OF THE DRIVEWAYS.
 EXTEND FROM THE CENTERLINE OF NOTTINGHAM TO 5 FEET PAST
 THE HIGH POINT OF THE DRIVEWAY. LABEL THE R/W NAME, R/W
 LINE, DISTANCES FROM THE R/W TO BACK OF CURB, TO FRONT
 AND BACK OF SIDEWALK, TO CENTERLINE, TO HIGH POINT OF
 DRIVEWAY, ETC. SHOW GENERAL SURFACE SLOPES.
  
 3, PROVIDE CROSS SECTIONS AT EACH OF THE OTHER THREE
 PROPERTY LINES. DEMONSTRATE THAT THE SURFACE RUNOFF
 WILL NOT FLOW ONTO THE ADJACENT PROPERTY.
  
 4. WHAT IS THE PURPOSE OF THE TRENCH DRAINS? THEY
 APPEAR TO BE LOCATED AT THE HIGH POINT OF THE
 DRIVEWAYS.
  
 5. IF TOWNHOUSE UNITS ARE INDIVIDUALLY OWNED
 PROPERTIES, THERE WILL NEED TO BE A HOMEOWNERS
 ASSOCIATION FORMED TO BE RESPONSIBLE FOR MAINTAINING
 THE STORMWATER MANAGEMENT SYSTEM. DRAINAGE EASEMENTS OF
 SUFFICIENT WIDTH WILL BE NEEDED OVER THE DRAINAGE
 SYSTEM TO ALLOW THE EXFILTRATION TRENCHES TO BE
 REPLACED IN THE FUTURE WHEN THEY NO LONGER ARE
 FUNCTIONING AS DESIGNED.
  
 6. LABEL ALL UTILITIES (SIZE, MATERIAL).
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH
 THE ENGINEERING PERMIT SUBMITTAL.
  
 2. PROVIDE COPY OF SFWMD ERP PERMIT BEFORE START OF
 CONSTRUCTION.
  
 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  

Review Stop SURVEY SURVEYING
Rev No 2 Status F Date 07-11-2023 Cont ID  
Sent By vnoel Date 07-11-2023 Time 07:00 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
2023-07-11 07:02:531. NOT ALL CORNERS ARE IDENTIFIED AS FOUND OR SET.
 2. PROVIDE PARENT BENCHMARK DESCRIPTION.
 3. ADD CONVERSION TO NGVD-29.
 4. ON-SITE WATER AND SEWER TO BE PRIVATE.
 5. RE-PLAT WILL BE REQUIRED.

Review Stop SURVEY SURVEYING
Rev No 1 Status F Date 10-11-2022 Cont ID  
Sent By vnoel Date 10-11-2022 Time 12:48 Rev Time  
Received By vnoel Date   Time   Sent To  
Notes
2022-10-11 12:59:321. NOT ALL CORNERS SHOWN AS FOUND OR SET.
 2. LABEL ADJOINING LOTS/PROPERTY ON ALL SIDES.
 3. ARE TOWNHOMES TO BE FEE SIMPLE? IF SO, ADDITIONAL
 REVIEW WILL BE NEEDED AFTER LOT LINES, ROADWAY
 FRONTAGE, ETC. ARE DELINEATED.
 4. REPLAT WILL BE REQUIRED.
 5. ON-SITE WATER AND SEWER WILL BE PRIVATE.

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 2 Status F Date 07-17-2023 Cont ID  
Sent By   Date 07-17-2023 Time   Rev Time 0.00
Received By   Date 07-17-2023 Time   Sent To  
Notes
2023-07-17 19:42:361) PROVIDE A TRANSPORTATION SPECIFIC SITE PLAN (E.G.
 HORIZONTAL CONTROL/SIGNAGE & PAVEMENT MARKINGS) FOR THE
 GROUND FLOOR. PLEASE SHOWCASE ALL TRANSPORTATION
 RELATED FEATURES (E.G. ROADWAY WIDTHS, DRIVING AISLES,
 PARKING STALLS, SIDEWALK, CURB, GUTTER, DRIVEWAY,
 GATES, CROSSWALKS, VISIBILITY TRIANGLE, CORNER &
 DRIVEWAY SEPARATION DISTANCES, SLOPES, ETC.) PROPERLY
 LABELED AND DIMENSIONED
 2) IN THE TRANSPORTATION SPECIFIC SITE PLAN, PLEASE
 SHOWCASE BASIC CURB DETAILS (E.G. DRIVEWAY, CURB CUTS,
 PAVEMENT MARKINGS, PARKING STALLS, ETC.) ON THE
 OPPOSITE SIDE OF THE ROADS SURROUNDING THE PROPOSED
 DEVELOPMENT
 3) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND/OR
 SERVICE VEHICLES DRIVING IN AND OUT OF THE PROPOSED
 DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES AND WHEEL
 PATHS CLEARLY DISTINCT AND DEFINED IN DIFFERENT COLORS.
 PROVIDE THE ANALYSIS IN A SEPARATE SHEET
 4) INSTALL STOP SIGNS AND CORRESPONDING PAVEMENT
 MARKINGS AT EACH DRIVEWAY EXIT LANE
 5) PROVIDE A CONSTRUCTION MANAGEMENT PLAN. PLEASE REFER
 TO CITY CODE 86-246 FOR DETAILS
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status F Date 10-13-2022 Cont ID  
Sent By   Date 10-13-2022 Time   Rev Time  
Received By   Date 10-13-2022 Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status F Date 07-11-2023 Cont ID  
Sent By avolcy Date 07-11-2023 Time 16:26 Rev Time 0.00
Received By avolcy Date 07-11-2023 Time 17:26 Sent To  
Notes
2023-07-12 17:50:38ZONING PLAN REVIEW
 ________________________________________
  
 DATE OF REVIEW: 07.11.2023
 PROJECT NUMBER Z22090019
 ________________________________________
  
 REVIEW STATUS: FAILED
 ________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. PROVIDE THE TOTAL LOT WIDTH AND DEPTH ON SITE DATA
 TABLE.
  
 2. PROVIDE BICYCLE PARKING SPACES PER THE CITYS ZLDR
 SECTION 94-485(Q).
  
 2.1 UPDATE SITE DATA TABLE TO INCLUDE THE REQUIRED AND
 PROVIDED BICYCLE PARKING SPACES.
  
 2.2 BICYLE PARKING DETAILS SHALL BE PROVIDED. INCLUDE
 ELEVATIONS AND STANDARDS.
  
 3. PER FIGURE XV-2 OF THE CITYS ZLDRS, GENERAL PARKING
 DIMENSIONS FOR STANDARD PARKING STALLS ARE 8FT6 X 22FT.
 OFF-STREET PARKING IS SHOWN ON PLANS MEASURING 8FT X
 20FT. UPDATE ALL PLANS TO REFLECT THE CORRECT
 DIMENSIONS.
  
 4. DEMONSTRATE LOCATION OF PUBLIC ART ON SITE PLAN AND
 LANDSCAPE PLANS.
  
 5. THE NUMBER OF ACCESS POINTS TO STREETS IS LIMITED TO
 ONE PER SECTION 94-312(A), FOR RESIDENTIAL DEVELOPMENTS
 OF 3 TO 75 UNITS.
  
 6. SUBMIT A SUBDIVISION (MAJOR - PLAT/REPLAT)
 APPLICATION.
  
 7. UPDATE TITLE BLOCK TO REMOVE "TOWNHOUSES" AND
 INCLUDE "APARTMENTS."
  
 ________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 PLEASE NOTE THE FOLLOWING PROCESS COMMENTS WHEN
 RESUBMITTING:
 A. WRITTEN RESPONSES TO COMMENTS MADE BY ALL
 DEPARTMENTS SHALL BE PROVIDED UPON RESUBMISSION.
 B. PROVIDE AN ELECTRONIC COPY OF ALL PLANS AND REQUIRED
 MATERIALS AND 2 SETS OF FOLDED PHYSICAL PLANS, ALONG
 WITH ONE (1) REDUCED COPY (11 IN X 17 IN).
 C. PLEASE NOTE THAT RE-SUBMITTALS MAY BE SUBJECT TO
 ADDITIONAL COMMENTS.
 D. IF NO RESPONSE IS RECEIVED WITHIN 60 DAYS OF THE
 ISSUANCE OF THESE COMMENTS, THE APPLICATION WILL BE
 CONSIDERED WITHDRAWN AND ANY FURTHER ACTION WILL
 REQUIRE SUBMISSION OF A NEW DEVELOPMENT APPLICATION.
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 GAISHA (ANNE-CLERISSE) VOLCY, PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1552
 TTY: 800.955.8771
 E: [email protected]
  
 W: WPB.ORG
  

Review Stop Z ZONING
Rev No 1 Status F Date 10-06-2022 Cont ID  
Sent By kdefranc Date 10-06-2022 Time 10:28 Rev Time 0.00
Received By kdefranc Date 10-06-2022 Time 10:27 Sent To  
Notes
2022-10-06 10:28:2410/6/22 - FAILED
  
  
 PLEASE NOTE THE FOLLOWING PROCESS COMMENTS WHEN
 RESUBMITTING:
 A. WRITTEN RESPONSES TO COMMENTS MADE BY ALL
 DEPARTMENTS SHALL BE PROVIDED UPON RESUBMISSION.
 B. PROVIDE AN ELECTRONIC COPY OF ALL PLANS AND REQUIRED
 MATERIALS AND 2 SETS OF FOLDED PHYSICAL PLANS, ALONG
 WITH ONE (1) REDUCED COPY (11 IN X 17 IN).
 C. PLEASE NOTE THAT RE-SUBMITTALS MAY BE SUBJECT TO
 ADDITIONAL COMMENTS.
 D. IF NO RESPONSE IS RECEIVED WITHIN 60 DAYS OF THE
 ISSUANCE OF THESE COMMENTS, THE APPLICATION WILL BE
 CONSIDERED WITHDRAWN AND ANY FURTHER ACTION WILL
 REQUIRE SUBMISSION OF A NEW DEVELOPMENT APPLICATION.
 E. PLEASE NOTE THAT YOU ARE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. A RESUBMITTAL FEE OF
 20% OF THE ORIGINAL APPLICATION FEE WILL BE ASSESSED
 AFTER THE FIRST RESUBMITTAL.
  
 REQUIRED MATERIALS MUST BE PROVIDED:
 F. PLEASE PROVIDE LETTERS FROM PUBLIC UTILITIES (AT&T
 TELECOMMUNICATION, FLORIDA PUBLIC UTILITIES, FLORIDA
 POWER & LIGHT COMPANY, COMCAST CABLE COMMUNICATIONS,
 CITY OF WEST PALM BEACH UTILITIES) CONFIRMING THAT THE
 PROPOSED PROJECT DOES NOT ENCROACH INTO THEIR EASEMENTS
 OR OTHERWISE INTERFERE WITH THE PROVISIONS OF THEIR
 SERVICES.
 G. PLEASE PROVIDE A TRAFFIC CONCURRENCY/PERFORMANCE
 STANDARD REVIEW (TPS) LETTER FROM THE PALM BEACH COUNTY
 TRAFFIC DIVISION FOR THE SUBJECT PROJECT.
 H. PLEASE SUBMIT A SUBDIVISION (MAJOR - PLAT/REPLAT)
 APPLICATION.
 I. PLEASE PROVIDE REVISED PLANS ADDRESSING THE REVIEW
 COMMENTS BELOW.
 J. PLEASE PROVIDE/INDICATE/DEMONSTRATE CONSISTENT
 INFORMATION ON ALL THE DIFFERENT PLANS AND REQUIRED
 MATERIALS WITHIN THE APPLICATION PACKET RESUBMITTAL.
  
 PLANS REVIEW COMMENTS MUST BE ADDRESSED:
 1. PLEASE CLARIFY AND CONFIRM IF THE PROPOSED UNITS ARE
 FEE SIMPLE INDIVIDUALLY OWNED OR NOT ON THE REVISED
 PLANS AND MATERIALS, ACCORDINGLY.
 2. IN ACCORDANCE WITH THE CITY???S ZONING AND LAND
 DEVELOPMENT REGULATIONS (ZLDR) SUBSECTION 94-309(G)(3),
 PLEASE IDENTIFY/INDICATE THE PERCENTAGE OF THE PROPOSED
 LOTS AREAS THAT WILL BE CONVEYED TO THE OWNER IN FEE
 SIMPLE TITLE IN THE ???SITE DATA??? SECTION ON SP-1
 SHEET 1 OF 2.
 3. IN ACCORDANCE WITH THE ZLDR SUBSECTION 94-309(G)(3),
 PLEASE IDENTIFY/INDICATE THE PERCENTAGE OF THE PROPOSED
 GROUND FLOOR BUILDING AREAS THAT WILL BE CONVEYED TO
 THE OWNER IN FEE SIMPLE TITLE IN THE ???SITE DATA???
 SECTION ON SP-1 SHEET 1 OF 2.
 4. PLEASE IDENTIFY/INDICATE/DEMONSTRATE/DELINEATE THE
 PROPOSED LOT LINES, LOT WIDTH DIMENSIONS, AND LOT DEPTH
 DIMENSIONS FOR THE INDIVIDUAL UNITS ON THE PLANS,
 ACCORDINGLY. THEREFORE, IDENTIFY/INDICATE/DEMONSTRATE
 THE PROPOSED UNITS??? SETBACK DIMENSIONS FROM THE
 PROPOSED LOT LINES IN THE PLANS, ACCORDINGLY.
 5. IN ACCORDANCE WITH THE ZLDR SUBSECTION 94-309(C),
 PLEASE REVISE THE PLANS TO
 IDENTIFY/INDICATE/DEMONSTRATE ALL PROPOSED LOTS
 ACCESSIBLE VIA PUBLIC RIGHTS-OF-WAY, PUBLIC STREETS,
 PRIVATE STREETS, OR EASEMENTS APPROVED BY THE CITY.
 6. PLEASE COORDINATE WITH THE CITY???S ENGINEERING
 SERVICES DEPARTMENT AND REFER TO THE ZLDR SECTION
 94-342 FOR THE GENERAL DESIGN STANDARDS FOR STREETS,
 EASEMENTS, ETC.
 7. PLEASE IDENTIFY/INDICATE THE PROPOSED MAXIMUM NUMBER
 OF STORIES IN THE ???SITE DATA??? SECTION ON SP-1 SHEET
 1 OF 2.
 8. PLEASE CORRECT THE ???SITE DATA??? SECTION ON SP-1
 SHEET 1 OF 2 BY INDICATING THE MAXIMUM ALLOWED DENSITY
 AS 20.26 DWELLING UNITS PER ACRE.
 9. PLEASE CORRECT THE ???SITE DATA??? SECTION ON SP-1
 SHEET 1 OF 2 BY INDICATING MF20 - TOWNHOUSES PER ZLDR
 SUBSECTION 94-309(G) INSTEAD OF ???NC??? NEXT TO
 ???DEVELOPMENT STANDARDS???.
 10. PLEASE CORRECT THE ???SITE DATA??? SECTION ON SP-1
 SHEET 1 OF 2 BY INDICATING THE MINIMUM REQUIRED
 BUILDING SEPARATION DISTANCE AS 20 FEET.
 11. PLEASE CORRECT THE ???SITE DATA??? SECTION ON SP-1
 SHEET 1 OF 2 BY INDICATING CONSISTENT INFORMATION
 REGARDING THE PROPOSED BUILDING SEPARATION DISTANCES.
 12. PLEASE IDENTIFY/INDICATE/DEMONSTRATE THE PROPOSED
 STRUCTURAL INTRUSION SETBACK DIMENSIONS ON SP-1 SHEET 1
 OF 2 TO DEMONSTRATE COMPLIANCE WITH THE ZLDR SUBSECTION
 94-305(B)(2).
 13. PLEASE IDENTIFY/INDICATE/DEMONSTRATE THE PROPOSED
 MECHANICAL EQUIPMENT SETBACK DIMENSIONS ON SP-1 SHEET 1
 OF 2 TO DEMONSTRATE COMPLIANCE WITH THE ZLDR SUBSECTION
 94-305(B)(4).
 14. PLEASE IDENTIFY/INDICATE/DEMONSTRATE THE DRIVEWAYS
 AND CURB CUTS ADJACENT TO AND ACROSS FROM THE SUBJECT
 PROPERTY ON THE PLANS, ACCORDINGLY.
 15. THE PROPOSED DRIVEWAYS FOR THE INDIVIDUAL UNITS ARE
 NOT MEETING THE MINIMUM DEPTH REQUIREMENT PER THE ZLDR
 SECTION 94-485. THEREFORE, PLEASE REVISE THE PLANS,
 ACCORDINGLY.
 16. IN ACCORDANCE WITH THE PROPOSED NUMBER OF BEDROOMS
 PER UNIT IDENTIFIED/INDICATED/DEMONSTRATED ON SHEET #
 A-301 AND THE ZLDR SECTION 94-486, PLEASE CONFIRM THE
 PROPOSED NUMBER OF BEDROOMS PER UNIT AND REVISE THE
 PARKING CALCULATIONS (IN THE ???SITE DATA??? SECTION ON
 SP-1 SHEET 1 OF 2) AND THE PLANS, ACCORDINGLY.
 17. IN ACCORDANCE WITH THE ZLDR SECTION 94-486, PLEASE
 IDENTIFY/INDICATE/DEMONSTRATE THE REQUIRED AND PROPOSED
 NUMBER OF GUEST PARKING SPACES IN THE PARKING
 CALCULATIONS (IN THE ???SITE DATA??? SECTION ON SP-1
 SHEET 1 OF 2) AND THE PLANS, ACCORDINGLY.
 18. PLEASE COORDINATE WITH THE CITY???S ENGINEERING
 SERVICES, PUBLIC WORKS, AND PARKING ADMINISTRATION
 DEPARTMENTS FOR THE PROPOSED ON-STREET PARKING,
 CONSIDERING THE FACT THAT NOTTINGHAM BOULEVARD IS
 CURRENTLY BEING IMPROVED.
 19. IN ACCORDANCE WITH THE ZLDR SUBSECTION 94-485(Q),
 PLEASE IDENTIFY/INDICATE/DEMONSTRATE THE REQUIRED AND
 PROPOSED NUMBER OF BICYCLE PARKING SPACES IN THE
 PARKING CALCULATIONS (IN THE ???SITE DATA??? SECTION ON
 SP-1 SHEET 1 OF 2) AND THE PLANS, ACCORDINGLY.
 20. PLEASE PROVIDE THE STANDARD CITY DETAILS FOR
 BICYCLE PARKING ON SP-2 SHEET 2 OF 2.
 21. PLEASE IDENTIFY/INDICATE/DEMONSTRATE THE MISSING
 ???2???X2??? CONCRETE STEPPING STONE PAVERS??? ON
 SHEETS C2.1 AND C2.2 OF 8 AS IDENTIFIED ON SP-1 SHEET 1
 OF 2.
 22. PLEASE IDENTIFY/INDICATE/DEMONSTRATE THE PROPERTY
 LINES AND THE PROPOSED ILLUMINATION INTENSITY TO THE
 PROPERTY LINES ON SHEET L0 TO DEMONSTRATE COMPLIANCE
 WITH THE ZLDR SUBSECTION 94-309(A).
  
  
 KEVIE DEFRANC
 PLANNER - PLANNING DIVISION
 [email protected]
 561-822-1449
  

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved