Rev No 3 Status P Date 03-29-2023 Cont ID  
Sent By swelter Date 03-29-2023 Time 11:33 Rev Time 0.00
Received By swelter Date 06-15-2023 Time 09:58 Sent To  
Notes
2023-03-29 11:48:41REMINDER THAT THE ART ASSESSMENT IS DUE TO SYBILLE
 WELTER, ADMINISTRATOR OF PUBLIC ART AND CULTURE EMAIL:
 [email protected]
  
 RESUBMITTAL
  
 PROPOSED LOCATION FOR A FUTURE PUBLIC ARTWORK MEETS THE
 PUBLIC ART REQUIREMENTS FOR EXTERIOR PLACES THAT ALLOW
 FOR PUBLIC ACCESS AND VIEWING.
 PROPOSED LOCATION MEETS THE PUBLIC PLACES REQUIREMENT
 ??? 24/7 ACCESSIBILITY TO THE PUBLIC.
  
 OF NOTE:
 *THE FUTURE ARTWORK MUST BE CREATED BY A PROFESSIONAL
 ARTIST AS DEFINED IN THE CODE OF ORDINANCES AS AN
 INDIVIDUAL RECOGNIZED BY CRITICS AND PEERS AS A
 PROFESSIONAL PRACTITIONER IN THE VISUAL ARTS AS JUDGED
 BY THEIR BODY OF WORK, EDUCATIONAL BACKGROUND,
 TRAINING, EXPERIENCE, PUBLIC COMMISSIONS, EXHIBITION
 RECORD, PUBLICATIONS, RECEIPT OF HONORS AND AWARDS, AND
 TRAINING IN THE ARTS.
 * ARTWORK MUST BE DISTINCT FROM BUILDING/PROJECT (SEE
 BELOW), AND A UNIQUE PIECE OF WORK.
  
 INELIGIBLE ARTWORK INCLUDES, BUT IS NOT LIMITED TO THE
 FOLLOWING:
  
 DECORATIVE, ORNAMENTAL, ARCHITECTURAL OR FUNCTIONAL TO
 THE DESIGN OF THE PROJECT.
 COMMERCIAL EXPRESSION INCLUDING DESIGN ELEMENTS RELATED
 TO THE VISUAL IDENTITY OF THE PROJECT, BUILDING OR
 DEVELOPER SUCH AS LOGO, TRADEMARK, COLOR SCHEME, OR
 THEME ETC.
 REPRODUCTIONS OR MASS-PRODUCED DESIGN/ART OBJECTS
  

Review Stop AIPP ART IN PUBLIC PLACES
Rev No 2 Status F Date 02-02-2023 Cont ID  
Sent By swelter Date 02-02-2023 Time 13:36 Rev Time 0.00
Received By swelter Date 02-02-2023 Time 13:43 Sent To  
Notes
2023-02-02 13:43:12 
  
 PER THE ORDINANCE CONFIRMATION OF PUBLIC ART - OPTION 1
 OR 2 IS REQUIRED FOR SITE PLAN APPROVAL AND MOVING
 FORWARD TO DAC.
 AS PER MY PREVIOUS NOTE THIS SITE DOES NOT HAVE THE
 SPACE FOR THE INCLUSION OF ART AND THE TREATMENT OF
 WALLS WILL NOT MEET THE PUBLIC ART REQUIREMENTS.
 CONTRIBUTION TO THE PUBLIC ART ACCOUNT IS RECOMMENDED.
  
  

Review Stop AIPP ART IN PUBLIC PLACES
Rev No 1 Status F Date 10-11-2022 Cont ID  
Sent By swelter Date 10-11-2022 Time 14:07 Rev Time 0.00
Received By swelter Date 10-11-2022 Time 14:18 Sent To  
Notes
2022-10-11 14:18:00PUBLIC ART REQUIREMENT:
  
 TOTAL CONSTRUCTION COSTS OF THIS DEVELOPMENT ARE OVER
 $500,000 IT IS SUBJECT TO THE PUBLIC ART REQUIREMENT AS
 PER CITY ORDINANCE.
  
 OPTION 1: INSTALL ARTWORK ON THE DEVELOPMENT SITE
 VALUED IN AN AMOUNT NOT LESS THAN ONE PERCENT OF THE
 TOTAL CONSTRUCTION COSTS.
  
 FOR SITE PLAN APPROVAL PUBLIC ART NEEDS TO BE
 IDENTIFIED ON ALL THE SITE PLANS.
  
 OPTION 2: CONTRIBUTE AN AMOUNT EQUAL TO 75 PERCENT OF
 ONE PERCENT OF THE TOTAL CONSTRUCTION COSTS FOR DEPOSIT
 TO THE PUBLIC ART ACCOUNT.
  
 FOR EITHER OPTION A COMPLETED PUBLIC ART ASSESSMENT
 APPLICATION ALONG WITH EITHER THE ESCROW OF THE 1% OR
 IF CHOSEN OPTION 2 CONTRIBUTION INTO THE PUBLIC ART
 FUND IS REQUIRED AT TIME OF BUILDING PERMIT SUBMITTAL.
  
 DUE TO LACK OF PUBLICLY ACCESSIBLE LOCATIONS TO MEET
 THE PUBLIC ART REQUIREMENT IT IS RECOMMENDED THAT THE
 DEVELOPER CONTRIBUTE INTO THE PUBLIC ART FUND FOR THIS
 PROJECT.
  
 CONTACT SYBILLE WELTER, ADMINISTRATOR OF PUBLIC ART &
 CULTURE AT [email protected] WITH FURTHER QUESTIONS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 05-16-2023 Cont ID  
Sent By rbrown Date 05-16-2023 Time 20:03 Rev Time 0.00
Received By rbrown Date 05-16-2023 Time 20:03 Sent To  
Notes
2023-05-16 20:10:07DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR THE BUILDING PERMIT APPLICATION.
  
 2. DEMOLITION OF THE EXISTING BUILDING. AN ASBESTOS
 SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT
 REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH
 COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963,
 OR BY EMAIL: [email protected]
  
 3. ELECTRIC VEHICLE CHARGING STATION. IF ELECTRIC
 VEHICLE (EV) CHARGING STATIONS ARE PROVIDED AT LEAST 1
 IN 25 MUST COMPLY WITH ACCESSIBLE PARKING SPACE
 REQUIREMENTS.
  
 4. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT,
 THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR
 THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT,
 AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE
 FLORIDA BUILDING CODE.
  
 5. BUILDING LOCATION RELATIVE TO THE PROPERTY LINE AND
 OTHER STRUCTURES. WHEN SUBMITTED FOR BUILDING PERMIT,
 COMPLIANCE WITH ALL BUILDING SEPARATION, PERCENTAGE OF
 OPENINGS AND OPENING PROTECTIVE REQUIREMENTS OF
 CHAPTERS 6 AND 7 OF THE FLORIDA BUILDING CODE SHALL BE
 VERIFIED.
  
 6. ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE DOES
 NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL OPENINGS TO
 MEET THE DEFINITION OF AN OPEN PARKING GARAGE, IT WILL
 BE CONSIDERED AN ENCLOSED PARKING GARAGE AND MUST HAVE
 EXHAUST SYSTEMS. THE EXHAUST SYSTEMS SHALL BE DESIGNED
 TO MINIMIZE NOISE LEVELS USING INLINE FAN SILENCERS OR
 OTHER APPROVED METHODS.
  
 7. GREASE INTERCEPTOR. A GREASE INTERCEPTOR WILL BE
 REQUIRED. FOR INFORMATION ON THE REQUIRED TYPE, SIZE
 AND LOCATION, PLEASE CONTACT RYAN BROWN, CHIEF PLUMBING
 INSPECTOR, DEVELOPMENT SERVICES DEPARTMENT, AT (561)
 805-6692, OR BY EMAIL: [email protected]
  
 8. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS,
 GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND
 OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS,
 SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC.
  
 9. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND
 CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF
 CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL
 NEIGHBORING PROPERTIES.
  
 10. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER
 AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY,
 INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE
 CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF
 NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION
 THAT MAY AFFECT THE USE OF THEIR PROPERTY.
  
 11. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT
 WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL
 HAVE A SEPARATE ADDRESS ASSIGNED BASED ON THE LOCATION
 OF THE BUILDING ENTRANCE. FOR STREET ADDRESSING,
 CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT
 (561) 805 6659, OR BY EMAIL: [email protected]
  
 12. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT
 TO ART LIFE ASSESSMENT UNDER THE CITY OF WEST PALM
 BEACH ART IN PUBLIC PLACES (AIPP) PROGRAM. FOR ADVICE
 ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP
 ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC
 PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL:
 [email protected]
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 10-12-2022 Cont ID  
Sent By rbrown Date 10-12-2022 Time 22:25 Rev Time 0.00
Received By rbrown Date 10-12-2022 Time 22:25 Sent To  
Notes
2022-10-12 22:37:08DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR THE BUILDING PERMIT APPLICATION.
  
 2. DEMOLITION OF THE EXISTING BUILDING. AN ASBESTOS
 SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT
 REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH
 COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963,
 OR BY EMAIL: [email protected]
  
 3. ACCESSIBLE ROUTE. SITE PLAN, SHEET A1, DOES NOT
 APPEAR TO SHOW AN ACCESSIBLE ROUTE FROM THE SIDEWALK TO
 THE BUILDING ENTRANCE. WHEN SUBMITTED FOR PERMIT, THE
 PLANS SHALL SHOW AT LEAST ONE ACCESSIBLE ROUTE,
 COMPLYING WITH SECTIONS 206.2 AND 402.2 OF FLORIDA
 ACCESSIBILITY CODE, FROM THE PUBLIC RIGHT-OF-WAY TO ALL
 ACCESSIBLE BUILDING OR FACILITY ENTRANCES.
  
 4. ANY PART OF AN ACCESSIBLE ROUTE WITH A SLOPE GREATER
 THAN 1:20 SHALL BE CONSIDERED A RAMP AND SHALL COMPLY
 WITH SECTION 405 OF FLORIDA ACCESSIBILITY CODE.
  
 5. NUMBER OF ACCESSIBLE PARKING SPACES. SITE PLAN,
 SHEET A1, PARKING TABLE STATES THAT 52 PARKING SPACES
 WILLL BE PROVIDED BUT ONLY 2 ACCESSIBLE PARKING SPACES
 ARE SHOWN ON THE PLAN. 3 ACCESSIBLE PARKING SPACES ARE
 REQUIRED. THE MINIMUM NUMBER OF ACCESSIBLE PARKING
 SPACES PROVIDED SHALL BE IN ACCORDANCE WITH SECTION
 208.2 OF FLORIDA ACCESSIBILITY CODE.
  
 6. ELECTRIC VEHICLE CHARGING STATION. IF ELECTRIC
 VEHICLE (EV) CHARGING STATIONS ARE PROVIDED AT LEAST 1
 IN 25 MUST COMPLY WITH ACCESSIBLE PARKING SPACE
 REQUIREMENTS.
  
 7. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT,
 THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR
 THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT,
 AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE
 FLORIDA BUILDING CODE.
  
 8. BUILDING LOCATION RELATIVE TO THE PROPERTY LINE AND
 OTHER STRUCTURES. WHEN SUBMITTED FOR BUILDING PERMIT,
 COMPLIANCE WITH ALL BUILDING SEPARATION, PERCENTAGE OF
 OPENINGS AND OPENING PROTECTIVE REQUIREMENTS OF
 CHAPTERS 6 AND 7 OF THE FLORIDA BUILDING CODE SHALL BE
 VERIFIED.
  
 9. ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE DOES
 NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL OPENINGS TO
 MEET THE DEFINITION OF AN OPEN PARKING GARAGE, IT WILL
 BE CONSIDERED AN ENCLOSED PARKING GARAGE AND MUST HAVE
 EXHAUST SYSTEMS. THE EXHAUST SYSTEMS SHALL BE DESIGNED
 TO MINIMIZE NOISE LEVELS USING INLINE FAN SILENCERS OR
 OTHER APPROVED METHODS.
  
 10. GREASE INTERCEPTOR. A GREASE INTERCEPTOR WILL BE
 REQUIRED. FOR INFORMATION ON THE REQUIRED TYPE, SIZE
 AND LOCATION, PLEASE CONTACT RYAN BROWN, CHIEF PLUMBING
 INSPECTOR, DEVELOPMENT SERVICES DEPARTMENT, AT (561)
 805-6692, OR BY EMAIL: [email protected]
  
 11. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS,
 GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND
 OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS,
 SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC.
  
 12. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND
 CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF
 CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL
 NEIGHBORING PROPERTIES.
  
 13. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER
 AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY,
 INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE
 CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF
 NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION
 THAT MAY AFFECT THE USE OF THEIR PROPERTY.
  
 14. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT
 WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL
 HAVE A SEPARATE ADDRESS ASSIGNED BASED ON THE LOCATION
 OF THE BUILDING ENTRANCE. FOR STREET ADDRESSING,
 CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT
 (561) 805 6659, OR BY EMAIL: [email protected]
  
 15. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT
 TO ART LIFE ASSESSMENT UNDER THE CITY OF WEST PALM
 BEACH ART IN PUBLIC PLACES (AIPP) PROGRAM. FOR ADVICE
 ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP
 ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC
 PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL:
 [email protected]
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 4 Status P Date 05-01-2023 Cont ID  
Sent By lquinone Date 05-01-2023 Time 14:47 Rev Time 0.00
Received By lquinone Date 05-01-2023 Time 14:47 Sent To  
Notes
***NONE***

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 3 Status F Date 03-29-2023 Cont ID  
Sent By lquinone Date 03-29-2023 Time 07:27 Rev Time 0.00
Received By lquinone Date 03-29-2023 Time 07:26 Sent To  
Notes
2023-03-29 07:30:02REPEATED COMMENT:
  
 PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND
 STORMWATER INFRASTRUCTURE ALONG ENTIRE PROJECT FRONTAGE
 (THIS IS A CONDITION OF SITE PLAN APPROVAL).

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 2 Status F Date 01-13-2023 Cont ID  
Sent By rrossano Date 01-13-2023 Time   Rev Time 0.00
Received By rrossano Date 01-13-2023 Time   Sent To  
Notes
2023-01-13 10:56:41Z22090016 ??? HOTEL EVERNIA EXPANSION - 1.13.23 RESUB
  
 COMMENTS FROM RICK ROSSANO, SR. PROJECT COORDINATOR,
 ENGINEERING SERVICES AT 561-494-1098 [email protected]
 O PREVIOUS COMMENT: PROVIDE CCTV VIDEO OF EXISTING
 SANITARY SEWER AND STORMWATER INFRASTRUCTURE ALONG
 ENTIRE PROJECT FRONTAGE (THIS IS A CONDITION OF SITE
 PLAN APPROVAL).
  
 QUESTIONS AND COORDINATION CONTACTS:
 O MARK HURLEY, FIELD CUSTOMER SERVICE SUPERVISOR WITH
 CITY OF WPB PUBLIC UTILITIES, REGARDING PLACEMENT OF
 BACKFLOW DEVICES AND WATER METERS. CONTACT HIM AT
 561-822-2262 OR [email protected]
 O MIKE TECHNOW, PROJECT ENGINEER, PUBLIC UTILITIES
 DEPARTMENT AT 561-494-1047 OR [email protected]
 O TRACY WARD, SR. STORMWATER ENGINEER, ENGINEERING
 SERVICES DEPT. AT 561-494-1120 OR [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status F Date 09-26-2022 Cont ID  
Sent By rrossano Date 09-26-2022 Time   Rev Time  
Received By rrossano Date 09-26-2022 Time   Sent To  
Notes
2022-09-26 14:07:13COMMENTS FROM RICK ROSSANO, SR. PROJECT COORDINATOR,
 ENGINEERING SERVICES AT 561-494-1098 [email protected]
 GENERAL:
 O PLEASE RESPOND TO ALL COMMENTS IN WRITING, AND
 INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER
 (Z-XXXXXXXX).
 O THE CITY OF WEST PALM BEACH HAS A NUMBER OF
 REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY
 AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND
 WASTEWATER UTILITIES WITHIN THE CITY. PLEASE SEE
 DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AT THE LINK
 BELOW:
 A. HTTP://WPB.ORG/CMSPAGES/GETAMAZONFILE.ASPX?PATH=~\WP
 B_WEBSITE\MEDIA\ENGINEERING\DEVELOPMENT-APPLICATION-FUL
 L-PACKAGE_2016.PDF&HASH=7BD4DD7EB6115181D8C5977BCC02A97
 B1960045731D3658206F27451722716EF
 B. THIS AND OTHER RELATED ENGINEERING DOCUMENTS CAN BE
 FOUND HERE:
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
 C. ALSO SEE: CODE OF ORDINANCES, CITY OF WEST PALM
 BEACH, FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08,
 ADOPTED SEPT. 22, 2008. (SUPPLEMENT NO. 18)
 CHAPTER 90 UTILITIES, ARTICLE I. IN GENERAL,
 SEC. 90-7. POLICY REGARDING EXTENSION OF WATER OR SEWER
 SERVICE FACILITIES OF THE CITY.
 THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE
 CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY
 BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS,
 BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION.
 O AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR
 MORE INFORMATION, REFER TO THE LINK BELOW:
 A. HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PU
 BLICATIONS/BACKFLOW-CROSS-CONNECTION- CONTROL-MANUAL
 O PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY
 OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC
 RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF
 YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE
 MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL
 IN THE WPB ENGINEERING SERVICES DEPARTMENT AT
 [email protected] OR 561-494-1079 FOR FURTHER
 ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION
 ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD
 SURVEY, POT-HOLING, SOFT DIGS ETC.
 O PROVIDE EXISTING AND PROPOSED PERVIOUS AND IMPERVIOUS
 DATA.
  
 BACKFLOW ASSEMBLY AND METERS:
 O SHOW AND LABEL ANY EXISTING OR PROPOSED WATER
 SERVICES AND WATER METERS, ALONG WITH WHAT IS HAPPENING
 TO THEM.
 O SHOW EXISTING AND PROPOSED DEDICATED UTILITY
 EASEMENTS TO ALLOW ACCESS FOR CITY PERSONNEL TO
 PROPOSED UTILITY WATER METERS. VERIFY THAT THERE ARE NO
 STRUCTURES WITHIN EASEMENT.
 O PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED LOCATION
 OF WATER METER AND BACKFLOW
 PREVENTION.
 O BACKFLOWS SHALL BE INSTALLED ON PRIVATE PROPERTY
 OUTSIDE OF EASEMENTS AND RIGHTS OF WAY. DOMESTIC WATER
 METERS SHALL BE INSTALLED IMMEDIATELY ADJACENT TO
 PROPERTY LINE. 3 INCH AND LARGER WATER METERS SHALL BE
 INSTALLED ABOVE-GROUND ONLY.
 O CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA (MAKE
 NOTE USC APPROVED) AND FIRE BACKFLOW PREVENTER AS DCDA.
  
 WATER/WASTEWATER PLAN:
 O PROVIDE VERTICAL DATUM AND DATUM CONVERSION
 INFORMATION (NAVD 1988 AND NGVD 1929).
 O SHOW PROJECT ADDRESS ON ALL PLAN SHEETS.
 O PROVIDE LEGEND ON ALL PLAN SHEETS TO INCLUDE
 STREETLIGHT, SIGN POSTS, TRANSFORMER BOXES ETC.
 O PLANS SHALL SHOW EXISTING AND PROPOSED LOCATIONS AND
 DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND
 SEWER LINES AND CLEANOUTS, INCLUDING STUBS TO EACH
 PROPERTY LINE FOR WATER AND SANITARY SEWERS, THE MAKE
 AND MODEL OF ALL VALVES, POTABLE AND IRRIGATION METERS,
 BACKFLOWS, FIRE HYDRANTS AND FDCS, AND OTHER DEVICES TO
 BE INSTALLED ON THE SYSTEM, CATCH BASINS, CULVERTS,
 DITCHES INCLUDING GRADES, PIPES SIZES, MATERIALS,
 ELEVATIONS, ASSUMPTIONS, CALCULATIONS, INVERT
 ELEVATIONS FOR ALL INLETS AND MANHOLES AND PROFILES OF
 SANITARY SEWER LINES.
 O GATE VALVE BOXES SHALL NOT BE INSTALLED IN CURB OR
 SIDEWALK. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE
 PROFILE VIEW.
 O DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN
 VIEW FOR ALL SANITARY AND STORM SEWERS.
 O SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL.
 O PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED
 UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC,
 ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION
 FACILITIES INCLUDING PIPE SIZE AND MATERIAL LOCATED IN
 THE RIGHT-OF-WAY.
 O PROVIDE PROFILE AND CLEARANCES BETWEEN WATER, SEWER
 AND STORM LINES PER CITY OF WEST PALM BEACH STANDARD
 DETAIL GN-2 SERIES, AT ALL UTILITY CROSSINGS. PLEASE
 INCLUDE FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES INCLUDING PIPE SIZE AND
 MATERIAL LOCATED IN THE RIGHT-OF-WAY.
 O SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE DIRECTLY
 TO ENGINEERING (SHEET 33 OF CITY OF WPB DEVELOPMENT
 APPLICATION). PROVIDE CALCULATIONS ON PLANS OF EXISTING
 AND PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE,
 MAXIMUM AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS
 SHALL BE PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008
 FOR WATER.
 O PROVIDE FIRE FLOW TEST DATA.
 O PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND
 STORMWATER INFRASTRUCTURE ALONG ENTIRE PROJECT FRONTAGE
 (CONDITION OF SITE PLAN APPROVAL).
 O CUT AND CAP UTILITIES NOT IN USE AND REMOVE ANY
 ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY
 ROW.
 O WHEN PROPOSED, WATER MAINS IN CITY RIGHT OF WAY SHALL
 BE MADE OF DUCTILE IRON PIPE (NOT PVC) AND SPECIFY
 PROPOSED LENGTH IN FEET.
 O CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY
 SEWER ARE REQUIRED.
 O PROVIDE CLEANOUTS FOR PROPOSED SANITARY LINE ONSITE
 JUST INSIDE PROPERTY LINE, AT JOINTS AND EVERY 75 FEET.
 O ADD NOTE TO PLANS SPECIFYING CITY???S DOWNSTREAM LIFT
 STATION NUMBER.
 O PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR
 PROPOSED SANITARY LATERALS.
 O LABEL WATER LINES AS PRIVATE WHERE APPLICABLE.
 O PLEASE SHOW AND LABEL EXISTING AND PROPOSED GREASE
 TRAPS (IF ANY).
 O PER CITY STANDARDS MAINTAIN MINIMUM DISTANCE BETWEEN
 OUTSIDE DIAMETER OF CITY PIPE AND ROOT BARRIER.
  
 FORMAL ENGINEERING REVIEW:
 O FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND NPDES
 NOI REQUIREMENTS WILL BE ENFORCED.
 - AN NOI IS REQUIRED FOR PROJECTS THAT:
 - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS
 THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF
 DEVELOPMENT OR SALE;
 - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE
 STATE OR TO SURFACE WATERS OF THE STATE THROUGH A
 MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4).
 - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF
 CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION
 THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL
 SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT
 OF THE 10-2 CERTIFICATION.
 O FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 EASEMENT FOR PLACEMENT OF PROPOSED WATER METERS.
 O FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES OF
 WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS.
 O FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING
 APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT
 SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING
 SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED
 LEAD-FREE DESIGN.
 O FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY LINES
 ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY
 LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT
 PARCELS.
 O FOR FORMAL ENGINEERING SUBMITTAL, IF WATER LINES ARE
 BEING REPLACED IN ROW, SHOW ADJACENT PARCEL ADDRESSES.
 O FOR FORMAL ENGINEERING SUBMITTAL, ADD NOTE TO PROVIDE
 50 FT. PAVEMENT RESTORATION TRANSITION ON EACH SIDE OF
 PROPOSED TRENCH IN CITY MAINTAINED ROADWAY AREAS PER
 CITY OF WPB STANDARD DETAIL GC-8.
 O FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 CALCULATIONS OF PERVIOUS AND IMPERVIOUS AREAS FOR
 PROPOSED IMPROVED AREAS.
  
 QUESTIONS AND COORDINATION CONTACTS:
 O MARK HURLEY, FIELD CUSTOMER SERVICE SUPERVISOR WITH
 CITY OF WPB PUBLIC UTILITIES, REGARDING PLACEMENT OF
 BACKFLOW DEVICES AND WATER METERS. CONTACT HIM AT
 561-822-2262 OR [email protected]
 O MIKE TECHNOW, PROJECT ENGINEER, PUBLIC UTILITIES
 DEPARTMENT AT 561-494-1047 OR [email protected]
 O TRACY WARD, SR. STORMWATER ENGINEER, ENGINEERING
 SERVICES DEPT. AT 561-494-1120 OR [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 09-29-2022 Cont ID  
Sent By pleduc Date 09-29-2022 Time   Rev Time 0.00
Received By pleduc Date 09-29-2022 Time 15:36 Sent To  
Notes
2022-09-29 15:37:11THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC,
 FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM
 BEACH FIRE RESCUE.
 THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE
 DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE.
 ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS
 ARE SUBMITTED FOR PERMIT.
 THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE
 PROPOSED PROJECT; HOWEVER, THE FOLLOWING COMMENTS ARE
 PROVIDED AND MAY NEED FURTHER CLARIFICATIONS WHERE
 APPLICABLE.
 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY
 WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE
 PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A
 PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED
 TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN
 STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY
 MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER
 PROTECTION.
 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY
 IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING
 ALL CONSTRUCTION ACTIVITIES.
 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM
 ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION.
 ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND
 AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT
 WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS.
 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE
 REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE
 ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS.
 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH
 THE 7TH EDITION OF THE FLORIDA FIRE PREVENTION CODE,
 INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES.
 6. ALL PARKING STRUCTURES SHALL COMPLY WITH NFPA 88A,
 PARKING STRUCTURES AND NFPA 101, THE LIFE SAFETY CODE,
 INCLUDING MORE SPECIFICALLY, CHAPTER 42 STORAGE
 OCCUPANCIES (PARKING STRUCTURES)
 7. A NFPA 13 COMPLAINT FIRE SPRINKLER SYSTEM AND NFPA
 14 COMPLIANT WET STANDPIPE SYSTEM ARE REQUIRED FOR THIS
 STRUCTURE. TEMPORARY STANDPIPES ARE REQUIRED WHEN THE
 BUILDING REACHES THREE LEVELS OR THIRTY FEET WHILE
 BEING CONSTRUCTED. SEPARATE SHOP DRAWINGS, ARE REQUIRED
 TO BE SUBMITTED, REVIEWED AND APPROVED BY THE FIRE
 PREVENTION BUREAU PRIOR TO ANY INSTALLATION.
 IT IS RECOMMENDED FOR HIGH RISES HAVE TWO SEPARATE FDC
 LOCATIONS REMOTELY LOCATED TO SERVE THE STANDPIPE
 SYSTEM.
  
 7A. PER NFPA 14
 6.4.5.4* FIRE DEPARTMENT CONNECTIONS SHALL BE LOCATED
 NOT MORE THAN 100 FT (30.5 M) FROM THE NEAREST FIRE
 HYDRANT CONNECTED TO AN APPROVED WATER SUPPLY.
 7B. PLEASE REVIEW THE DISTANCE SEPARATION OF THE
 STAIRWELLS AS THE SEPARATION DISTANCE IS NOT INDICATED.
 7.3.2.2* WHERE THE MOST REMOTE PORTION OF A
 NON-SPRINKLERED FLOOR OR STORY IS LOCATED IN EXCESS OF
 150 FT (45.7 M) OF TRAVEL DISTANCE FROM A HOSE
 CONNECTION IN OR ADJACENT TO A REQUIRED EXIT OR THE
 MOST REMOTE PORTION OF A SPRINKLERED FLOOR OR STORY IS
 LOCATED IN EXCESS OF 200 FT (61 M) OF TRAVEL DISTANCE
 FROM A HOSE CONNECTION IN OR ADJACENT TO A REQUIRED
 EXIT, ADDITIONAL HOSE CONNECTIONS SHALL BE PROVIDED, IN
 APPROVED LOCATIONS, WHERE REQUIRED BY THE LOCAL FIRE
 DEPARTMENT OR THE AHJ.
 7C. PER NFPA 1
 18.3 WATER SUPPLIES.
 18.3.1* AN APPROVED WATER SUPPLY CAPABLE OF SUPPLYING
 THE REQUIRED FIRE FLOW FOR FIRE PROTECTION SHALL BE
 PROVIDED TO ALL PREMISES UPON WHICH FACILITIES,
 BUILDINGS, OR PORTIONS OF BUILDINGS ARE HEREAFTER
 CONSTRUCTED OR MOVED INTO THE JURISDICTION. THE
 APPROVED WATER SUPPLY SHALL BE IN ACCORDANCE WITH
 SECTION 18.4.
 PER FLORIDA ADMINISTRATIVE CODE SECTION 61G15-32.004,
 FIRE PROTECTION ENGINEERING DOCUMENTS SHALL INCLUDE THE
 POINT OF SERVICE FOR THE WATER SUPPLY, A LIST OF
 APPLICABLE NFPA STANDARDS APPLICABLE TO THE PROJECT,
 CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR
 AREA, SUPPRESSION SYSTEM TYPE, DESIGN DENSITIES, WATER
 SUPPLY DATA (FIRE PUMP DATA, HYDRANT FLOW TEST DATA)
 AND ANY PERFORMANCE BASED INFORMATION SUCH AS
 PRE-ENGINEERED SYSTEMS.
 FOR THE PROPOSED FIRE PUMP(S) , WHAT IS(ARE) THE
 PRIMARY AND SECONDARY POWER SOURCES?
 7D. THE LOCATION OF THE DDCV FIRE LINE LOCATION SHALL
 MEET THE REQUIREMENTS OF NFPA 24 AND SHALL BE
 COORDINATED WITH THE OFFICE OF FIRE MARSHAL, THE CITY'S
 ENGINEERS OFFICE, THE LANDSCAPE PLANNER, AND THE CITY'S
 PLANNING AND ZONING OFFICE.
 8. A NFPA 72 COMPLIANT MONITORED FIRE ALARM SYSTEM IS
 REQUIRED FOR THIS STRUCTURE. SEPARATE SHOP DRAWINGS,
 ARE REQUIRED TO BE SUBMITTED, REVIEWED AND APPROVED BY
 THE FIRE PREVENTION BUREAU PRIOR TO ANY INSTALLATION.
 9. ALL ELEVATORS SHALL BE EQUIPPED WITH A REGION 7
 KEYWAY SYSTEM FOR BUILDING 6 OR MORE STORIES.
 ALL NEW ELEVATORS SHALL CONFORM TO THE FIRE FIGHTER???S
 EMERGENCY OPERATIONS REQUIREMENTS OF ASME A17.1/CSA
 B44, SAFETY CODE FOR ELEVATORS.
 ANY BUILDING THAT IS MORE THAN THREE STORIES HIGH OR IN
 WHICH THE VERTICAL DISTANCE BETWEEN THE BOTTOM TERMINAL
 LANDING AND THE TOP TERMINAL LANDING EXCEEDS 25 FEET
 MUST BE CONSTRUCTED TO CONTAIN AT LEAST ONE PASSENGER
 ELEVATOR THAT IS OPERATIONAL AND WILL ACCOMMODATE AN
 AMBULANCE STRETCHER 76 INCHES LONG AND 24 INCHES WIDE
 IN THE HORIZONTAL POSITION.
 10. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL
 BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL
 DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS,
 EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A
 PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE
 SAFETY FEATURES AND EQUIPMENT.
 11. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS
 DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED
 ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF
 FIRE PREVENTION.
 ALL NEW FIRE HYDRANTS AND FDC???S PLANNED FOR THIS
 DEVELOPMENT SHALL BE CLOSELY COORDINATED WITH THE
 BUREAU OF FIRE PREVENTION. PROPOSED FIRE HYDRANTS AND
 FDC???S SHOULD BE LOCATED ON THE SAME SIDE OF THE
 STREET OR ACCESS ROADWAY TO ALLOW FREE ACCESS FOR OTHER
 ARRIVING EMERGENCY VEHICLES.
 12. COMMAND ROOM
 THE FIRE COMMAND CENTER SHALL COMPLY WITH NFPA 1,
 CHAPTER 11, BUILDING SERVICES; 11.9 AND SHALL CONTAIN
 THE FOLLOWING FEATURES:
 11.9.1 THE LOCATION, DESIGN, CONTENT, AND FIRE
 DEPARTMENT ACCESS OF THE EMERGENCY COMMAND CENTER SHALL
 BE APPROVED BY THE FIRE DEPARTMENT.
  
 11.9.2 THE EMERGENCY COMMAND CENTER SHALL BE SEPARATED
 FROM THE REMAINDER OF THE BUILDING BY A FIRE BARRIER
 HAVING A FIRE RESISTANCE RATING OF NOT LESS THAN 1
 HOUR.
  
 11.9.3 THE EMERGENCY COMMAND CENTER ROOM SHALL BE A
 MINIMUM OF 200 FT2 (19 M2) WITH A MINIMUM DIMENSION OF
 10 FT (3050 MM).
  
 11.9.4 THE FOLLOWING SHALL BE PROVIDED IN THE EMERGENCY
 COMMAND CENTER.
 (1) THE FIRE DEPARTMENT COMMUNICATIONS SYSTEM.
 (2) A TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED
 ACCESS TO THE PUBLIC TELEPHONE SYSTEM
 (3) SCHEMATIC BUILDING PLANS INDICATING THE TYPICAL
 FLOOR PLAN AND DETAILING THE BUILDING CORE, MEANS OF
 EGRESS, FIRE PROTECTION SYSTEMS, FIRE-FIGHTING
 EQUIPMENT AND FIRE DEPARTMENT ACCESS
 (4) WORK TABLE.
 (5) IF APPLICABLE, A HAZARDOUS MATERIAL MANAGEMENT PLAN
 FOR THE BUILDING.
 11.9.5 WHERE OTHERWISE REQUIRED, THE FOLLOWING DEVICES
 OR FUNCTIONS SHALL BE PROVIDED WITHIN THE EMERGENCY
 COMMAND CENTER.
 (1) THE EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM
 CONTROL UNIT.
 (2) FIRE DETECTION AND ALARM SYSTEM ANNUNCIATOR UNIT.
 (3) ANNUNCIATOR UNIT VISUALLY INDICATING THE LOCATION
 OF THE ELEVATORS AND WHETHER THEY ARE OPERATIONAL
 (4) STATUS INDICATORS AND CONTROLS FOR AIR-HANDLING
 SYSTEMS.
 (5) CONTROLS FOR UNLOCKING STAIRWAY DOORS
 SIMULTANEOUSLY
 (6) SPRINKLER VALVE AND WATER FLOW DETECTOR DISPLAY
 PANELS
 (7) EMERGENCY AND STANDBY POWER STATUS INDICATORS
 (8) FIRE PUMP STATUS INDICATORS
 (9) GENERATOR SUPERVISION DEVICES AND MANUAL START AND
 TRANSFER FEATURES.
 (10) PUBLIC ADDRESS SYSTEM, WHERE SPECIFICALLY REQUIRED
 BY OTHER SECTIONS OF THIS CODE
 (11) CONTROLS REQUIRED FOR SMOKE CONTROL
  
 NFPA 101
  
 11.8.6* EMERGENCY COMMAND CENTER.
 11.8.6.1 AN EMERGENCY COMMAND CENTER SHALL BE PROVIDED
 IN A
 LOCATION APPROVED BY THE FIRE DEPARTMENT.
 11.8.6.2 THE EMERGENCY COMMAND CENTER SHALL CONTAIN THE
 FOLLOWING:
 (1) VOICE FIRE ALARM SYSTEM PANELS AND CONTROLS
 (2) FIRE DEPARTMENT TWO-WAY TELEPHONE COMMUNICATION
 SERVICE
 PANELS AND CONTROLS WHERE REQUIRED BY ANOTHER SECTION
 OF THIS
 CODE
 (3) FIRE DETECTION AND FIRE ALARM SYSTEM ANNUNCIATION
 PANELS
 (4) ELEVATOR FLOOR LOCATION AND OPERATION ANNUNCIATORS
 (5) ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME
 A17.1/CSA B44, SAFETY CODE FOR ELEVATORS AND ESCALATORS
 (6) ELEVATOR EMERGENCY POWER SELECTOR SWITCH(ES) WHERE
 PROVIDED
 IN ACCORDANCE WITH ASME A17.1/CSA B44
 (7) SPRINKLER VALVE AND WATERFLOW ANNUNCIATORS
 (8) EMERGENCY GENERATOR STATUS INDICATORS
 (9) CONTROLS FOR ANY AUTOMATIC STAIRWAY DOOR UNLOCKING
 SYSTEM
 (10) FIRE PUMP STATUS INDICATORS
 (11) TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED
 ACCESS TO THE
 PUBLIC TELEPHONE SYSTEM
 (12) STAIRWAY VIDEO MONITORING EQUIPMENT AS REQUIRED BY
 11.8.8
 13. TWO-WAY RADIO COMMUNICATIONS ENHANCEMENT SYSTEMS.
 NFPA 1, CHAPTER 11, BUILDING SERVICES; 11.10 TWO-WAY
 RADIO ENHANCEMENT SERVICES.
 11.10.1 IN ALL NEW AND EXISTING BUILDINGS, MINIMUM
 RADIO SIGNAL STRENGTH FOR FIRE DEPARTMENT
 COMMUNICATIONS SHALL BE MAINTAINED AT A LEVEL
 DETERMINED BY THE AHJ.
 NFPA 72, 24.9 TWO-WAY RADIO COMMUNICATIONS ENHANCEMENT
 SYSTEMS.
 24.9.1 GENERAL.
 24.9.1.1 NON-INTERFERENCE. NO AMPLIFICATION SYSTEM
 CAPABLE
 OF OPERATING ON FREQUENCIES OR CAUSING INTERFERENCE ON
 FREQUENCIES
 ASSIGNED TO THE JURISDICTION BY THE FCC SHALL BE
 INSTALLED
 WITHOUT PRIOR COORDINATION AND APPROVAL OF THE
 AUTHORITY
 HAVING JURISDICTION. THE BUILDING MANAGER/OWNER SHALL
 SUSPEND AND CORRECT OTHER EQUIPMENT INSTALLATIONS THAT
 DEGRADE
 THE PERFORMANCE OF THE PUBLIC SAFETY RADIO SYSTEM OR
 PUBLIC SAFETY RADIO ENHANCEMENT SYSTEM.
 24.9.1.2 APPROVAL AND PERMIT. PLANS SHALL BE SUBMITTED
 FOR
 APPROVAL PRIOR TO INSTALLATION. AT THE CONCLUSION OF
 SUCCESSFUL
 ACCEPTANCE TESTING, A RENEWABLE PERMIT SHALL BE ISSUED
 FOR THE
 PUBLIC SAFETY RADIO ENHANCEMENT SYSTEM WHERE REQUIRED
 BY
 THE AUTHORITY HAVING JURISDICTION.
  
 THE SYSTEM SHALL MAINTAIN A MINIMUM RADIO SIGNAL
 STRENGTH OF THE RADIO SYSTEM USED BY WEST PALM BEACH
 FIRE DEPARTMENT. TESTING SHALL BE BY AN ACCEPTABLE
 NATIONAL STANDARD DOCUMENTING PERCENTAGES NOTED ABOVE
 AND BY ACTUAL RADIO TESTING BY FIRE PERSONNEL. IF THE
 MINIMUM CANNOT BE MAINTAINED, A BI-DIRECTIONAL
 AMPLIFIED SYSTEM SHALL BE INSTALLED WITH A MINIMUM
 2-HOUR RUN TIME BATTERY BACK-UP.
 PLEASE CONTACT MARK FILLA, PALM BEACH COUNTY PUBLIC
 SAFETY RADIO SYSTEMS MANAGER, [email protected],
 561-233-0837; AS OUR RADIOS OPERATE ON THEIR SYSTEM FOR
 DETAILED RADIO FREQUENCY AND INSTALLATION INSTRUCTIONS.
  
  
 14. KNOX-BOX KEY SYSTEM SHALL BE REQUIRED FOR THIS
 BUILDING.
 ANY GATES SHALL BE PROVIDED WITH KNOX KEY ACCESS LOCKS,
 PADLOCKS AND/OR SWITCHES FOR 24 HOUR EMERGENCY ACCESS.
 15. THE SMOKE CONTROL SYSTEM SHALL COMPLY WITH NFPA
 101, CHAPTER 9, BUILDING SERVICE AND FIRE PROTECTION
 EQUIPMENT, INCLUDING:
 THE SMOKE CONTROL SYSTEMS SHALL BE INSTALLED,
 INSPECTED, TESTED, AND MAINTAINED IN ACCORDANCE WITH
 NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS; NFPA 204,
 STANDARD FOR SMOKE AND HEAT VENTING; OR NATIONALLY
 RECOGNIZED STANDARDS, ENGINEERING GUIDES, OR
 RECOMMENDED PRACTICES, AS APPROVED BY THE AUTHORITY
 HAVING JURISDICTION.
 THE ENGINEER OF RECORD SHALL CLEARLY IDENTIFY THE
 INTENT OF THE SYSTEM, THE DESIGN METHOD USED, THE
 APPROPRIATENESS OF THE METHOD USED, AND THE REQUIRED
 MEANS OF INSPECTING, TESTING, AND MAINTAINING THE
 SYSTEM.
 ACCEPTANCE TESTING SHALL BE PERFORMED BY A SPECIAL
 INSPECTOR IN ACCORDANCE WITH SECTION 9.9.
 16. AREAS OF REFUGE SHALL COMPLY WHERE APPLICABLE PER
 THE BUILDING CODE AND NFPA 101, CH 7, MEANS OF EGRESS.
 17. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT
 DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL.
 18. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING
 PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH
 THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop L LANDSCAPING
Rev No 2 Status F Date 01-30-2023 Cont ID  
Sent By rcaranci Date 01-30-2023 Time 16:49 Rev Time 0.00
Received By rcaranci Date 01-30-2023 Time 16:49 Sent To  
Notes
2023-01-30 16:49:36FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: EVERNIA HOTEL Z22090016
 JANUARY 30, 2023
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 1. PARTIALLY SATISFIED. PROVIDE A TREE SURVEY AND TREE
 DISPOSITION PLAN. PROVIDE THE INDIVIDUAL AND TOTAL
 CANOPY MITIGATION DUE FOR ALL PROPOSED REMOVALS. TREES
 PROPOSED TO BE REMOVED WITH A CANOPY DIAMETER OF 20
 FEET OR MORE SHOULD HAVE THE MITIGATION SQUARE FOOTAGE
 CALCULATED BASED ON THE ACTUAL DIAMETER. TREES LESS
 THAN 20 FEET CANOPY DIAMETER AND PALMS SHOULD SHOW THE
 CATEGORY MITIGATION DUE.
 TREE CANOPY CALCULATIONS ARE MISSING FROM SHEET TD-1.
  
 2. PARTIALLY SATISFIED. PER SECTION 94-113 D. ALL
 STREETSCAPE REQUIREMENTS ARE APPLICABLE TO ANY NEW
 CONSTRUCTION, RENOVATION OR ADDITION WITH A
 CONSTRUCTION COST EQUAL OR ABOVE 50% OF THE PROPERTY'S
 IMPROVEMENT VALUE AS INDICATED BY THE PALM BEACH COUNTY
 PROPERTY APPRAISER'S OFFICE. EXISTING SIDEWALK FOR THIS
 PROJECT IS TO BE REMOVED AND REPLACED WITH THE REQUIRED
 NEW STREET TREES, SIDEWALK, PLANTING BEDS AND
 STRUCTURAL SOIL.
 1/30/23 ADDRESS THE FOLLOWING ITEMS:
 ??? THE STRIPING AND CURBED AREAS IN THE STREET NEED TO
 BE MORE DETAILED. THE AREAS SHOWN WITH CURBING NEED TO
 SHOW LANDSCAPING SUCH AS GROUNDCOVER OR GRASS.
 ??? ENTRANCE/EXIT DESIGNED WITH THE DOUBLE LANES FROM
 EVERNIA WOULD ALLOW THE ADJUSTMENT OF THE STREET TREES
 TO MORE THAN 30 FEET TO ALLOW ADEQUATE CLEARANCE ON
 EITHER SIDE OF THE DRIVEWAY. IF THE DRIVEWAY IS
 NARROWED, THE 30 FOOT SPACING CAN BE MAINTAINED.
 ??? PLANTING STRIPS NEED TO BE PROVIDED ALONG THE CURB
 IF THERE IS NO ADJACENT PARKING SPACE.
 ??? CLUSIA STREET TREES ARE UNUSUAL FOR THE DOWNTOWN.
 STAFF RECOMMENDS LIVE OAK TO MATCH THE SURROUNDING
 STREETSCAPE.
  
  
 3. SATISFIED. PROVIDE CALCULATIONS FOR REQUIRED STREET
 TREES AT MAXIMUM SPACING EVERY 30 FEET OR PORTION
 THEREOF FOR THE EVERNIA STREETSCAPE LENGTH, AND SHOW
 THE NUMBER PROVIDED PER SECTION 94-113D.2.
  
 4. PARTIALLY SATISFIED. PROVIDE A DIAGRAM OF THE
 REQUIRED AND PROVIDED PRIVATE OPEN SPACE AREAS FOR THE
 QBD-8 ZONING DISTRICT IN THE SITE AND ARCHITECTURAL
 DRAWINGS. IDENTIFY THE TYPE OF OPEN SPACE AS ALLOWED BY
 TABLE IV-7 AND DEFINITIONS IN SECTION 94-109. SHOW HOW
 THE STANDARDS FOR THE TYPES OF OPEN SPACE ARE MET FOR
 VEGETATED AREAS AND TREE CANOPY SQUARE FOOTAGE BASED ON
 TABLE IV-8 ON THE LANDSCAPE PLAN. LANDSCAPE PLANS MUST
 MATCH THE ARCHITECTURAL PLANS AND CLEARLY IDENTIFY THE
 OPEN SPACE TYPE THEN DEMONSTRATE HOW THE REQUIREMENTS
 OF THAT TYPE ARE MET. PROVIDE THE INFORMATION ON THE
 CODE REQUIREMENT CHART ON SHEET L-201 AND LP.1.
 1/30/23 MAKE THE FOLLOWING ADJUSTMENTS/CLARIFICATIONS:
 ??? REQUIRED PRIVATE OPEN SPACE IS 4988 SF, SHOW WHERE
 THIS AMOUNT OF QUALIFYING SQUARE FOOTAGE IS PROVIDED.
 THE THREE SEPARATE AREAS A, B, AND C TOTAL MORE THAN
 REQUIRED.
 OPEN SPACE A, SHEET HP.1 INDICATING 3022 SQ FT INTERIOR
 COURTYARD
 ??? THERE IS NO TYPE 5 TREE, REMOVE REFERENCE FROM
 PLAN.
 ??? REMOVE NOTE REGARDING ALLOWABLE PERMEABLE AREA, THE
 REFERENCE IN THE DEFINITION OF VEGETATED AREA REQUIRES
 AT LEAST 80% TO BE PLANT MATERIAL AND UP TO 20%
 ALTERNATIVE PERVIOUS SURFACE SUCH AS DECORATIVE ROCKS.
 ??? THERE APPEARS TO BE A COVERED AREA WITHIN THE
 DESIGNATED OPEN SPACE AREA SHOWN ON THE PLAN, THIS
 NEEDS TO BE CALLED OUT AND THE SQUARE FOOTAGE SHOWN ON
 THE PLAN AND CHART.
 ??? THE PALMS SHOWN DO NOT QUALIFY AS LARGE PALMS FOR
 THE TYPE 4 SHOWN IN TABLE IV-8. PROVIDE THE REQUIRED
 TREE CANOPY WITH QUALIFYING TREE TYPES.
 OPEN SPACE B, SHEET HP.2 INDICATING 3742 SQ FT ROOFTOP
 GARDEN
 ??? THERE IS NO TYPE 5 TREE, REMOVE REFERENCE FROM
 PLAN.
 ??? TREE CANOPY REQUIREMENT FOR ROOFTOP GARDEN IS 20%
 NOT 50%, AS THIS IS NOT A TOD SUBDISTRICT.
 ??? REMOVE NOTE REGARDING ALLOWABLE PERMEABLE AREA, THE
 REFERENCE IN THE DEFINITION OF VEGETATED AREA REQUIRES
 AT LEAST 80% TO BE PLANT MATERIAL AND UP TO 20%
 ALTERNATIVE PERVIOUS SURFACE SUCH AS DECORATIVE ROCKS.
 ??? THE PALMS SHOWN DO NOT QUALIFY AS LARGE PALMS FOR
 THE TYPE 4 SHOWN IN TABLE IV-8. PROVIDE THE REQUIRED
 TREE CANOPY WITH QUALIFYING TREE TYPES. 748.4 SQ FT
 TREE CANOPY REQUIRED, THE THREE SEA GRAPES ARE TYPE 1
 AT 500 SQ FT EACH, SO THE MINIMUM WOULD BE MET.
 OPEN SPACE C, SHEET HP.3, INDICATING 5443 SQ FT ROOFTOP
 GARDEN
 ??? THERE IS NO TYPE 5 TREE, REMOVE REFERENCE FROM
 PLAN.
 ??? TREE CANOPY REQUIREMENT FOR ROOFTOP GARDEN IS 20%
 NOT 50%, AS THIS IS NOT A TOD SUBDISTRICT.
 ??? REMOVE NOTE REGARDING ALLOWABLE PERMEABLE AREA, THE
 REFERENCE IN THE DEFINITION OF VEGETATED AREA REQUIRES
 AT LEAST 80% TO BE PLANT MATERIAL AND UP TO 20%
 ALTERNATIVE PERVIOUS SURFACE SUCH AS DECORATIVE ROCKS.
 ??? THE PALMS SHOWN DO NOT QUALIFY AS LARGE PALMS FOR
 THE TYPE 4 SHOWN IN TABLE IV-8. PROVIDE THE REQUIRED
 TREE CANOPY WITH QUALIFYING TREE TYPES. 1088 SQ FT TREE
 CANOPY REQUIRED, THE THREE SEA GRAPES ARE TYPE 1 AT 500
 SQ FT EACH, AND THE TWO QUEENS CRAPE MYRTLE ARE TYPE 2
 MEDIUM TREES AT 300 SQ FT EACH, SO THE MINIMUM WOULD BE
 MET.
  
  
  
  
 5. SATISFIED. PROVIDE THE BUFFER REQUIREMENT
 CALCULATIONS FOR THE WEST PROPERTY LINE LANDSCAPE
 BUFFER. THE EAST PROPERTY LINE SHOULD ALSO HAVE THE
 BUFFER PROVIDED ALONG THE ENTIRE LENGTH ESPECIALLY
 ALONG THE BLANK WALL. LANDSCAPING MUST BE PROVIDED
 ALONG THE NORTH PROPERTY LINE WHERE POSSIBLE, PROVIDE
 BUFFER CALCULATIONS.
  
  
 6. SATISFIED. ARTIFICIAL TURF AREAS PROPOSED MUST MEET
 THE REQUIREMENTS OF SECTION 94-451, INCLUDING ALL AREAS
 THAT ARE ALLOWED BY CODE MUST NOT BE VISIBLE FROM A
 ROAD OR STREET.
  
  
 7. SATISFIED. EXPLAIN IF THE EXISTING FPL TRANSMISSION
 LINES WITHIN THE ALLEY WILL STAY IN PLACE OR BE
 RELOCATED.
  
 8. PARTIALLY SATISFIED. SHOW ALL EXISTING AND PROPOSED
 WATER AND SEWER AND DRAINAGE LINES ON THE LANDSCAPE
 PLAN. SHOW LOCATIONS OF BACKFLOWS AND ADJUST LOCATIONS
 OF UTILITY LINES TO RESOLVE CONFLICTS WITH EXISTING AND
 PROPOSED TREES AND LANDSCAPING.
 WATER SERVICE AND FIRE LINES GOING INTO THE PROPERTY
 NEED TO BE ADJUSTED TO THE EAST TO AVOID CONFLICT WITH
 THE STREET TREE.
  
  
 9. SATISFIED. PLANT LIST NEEDS TO BE MODIFIED TO
 INCLUDE ALL PLANT MATERIAL FOR THE PROJECT,
 AND SEPARATE PLANT LIST FOR EACH OPEN SPACE AREA
 PROVIDED FOR REFERENCE TO SHOW COMPLIANCE WITH THE OPEN
 SPACE TYPE REQUIREMENTS.
  
 10. SATISFIED. PROVIDE THE FLORIDA FRIENDLY LANDSCAPE
 DESIGN OPTIONS CHART SECTION 94-446 (G) AND PROVIDE THE
 REQUIRED 50 POINTS.
  
 11. PARTIALLY SATISFIED. ADD COLUMNS FOR NATIVE PLANT
 AND DROUGHT TOLERANCE TO THE PLANT LIST.
 PLEASE ADD THE COLUMNS, IT IS EASIER FOR STAFF TO
 VERIFY THE INFORMATION IF IT IS SEPARATED.
  
 12. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L.
 PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT
 MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT
 TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE
 LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH
 FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH
 FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE OF
 NATIVE AND DROUGHT TOLERANT PLANTS ADDED BASED ON THE
 PLANT LIST.
  
 13. SATISFIED. PROVIDE SCREENING HEDGES FOR ALL GROUND
 MOUNTED VALVES AND EQUIPMENT AND ADD A NOTE THAT ALL
 EQUIPMENT WILL BE SCREENED.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE STREET TREES AND
 RIGHT OF WAY LANDSCAPING AND IRRIGATION. THIS WILL BE
 THROUGH A SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  

Review Stop L LANDSCAPING
Rev No 1 Status F Date 10-05-2022 Cont ID  
Sent By rcaranci Date 10-05-2022 Time 14:58 Rev Time 0.00
Received By rcaranci Date 10-05-2022 Time 14:58 Sent To  
Notes
2022-10-05 14:58:44FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: EVERNIA HOTEL Z22090016
 OCTOBER 5, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 1. PROVIDE A TREE SURVEY AND TREE DISPOSITION PLAN.
 PROVIDE THE INDIVIDUAL AND TOTAL CANOPY MITIGATION DUE
 FOR ALL PROPOSED REMOVALS. TREES PROPOSED TO BE REMOVED
 WITH A CANOPY DIAMETER OF 20 FEET OR MORE SHOULD HAVE
 THE MITIGATION SQUARE FOOTAGE CALCULATED BASED ON THE
 ACTUAL DIAMETER. TREES LESS THAN 20 FEET CANOPY
 DIAMETER AND PALMS SHOULD SHOW THE CATEGORY MITIGATION
 DUE.
  
 2. PER SECTION 94-113 D. ALL STREETSCAPE REQUIREMENTS
 ARE APPLICABLE TO ANY NEW CONSTRUCTION, RENOVATION OR
 ADDITION WITH A CONSTRUCTION COST EQUAL OR ABOVE 50% OF
 THE PROPERTY'S IMPROVEMENT VALUE AS INDICATED BY THE
 PALM BEACH COUNTY PROPERTY APPRAISER'S OFFICE. EXISTING
 SIDEWALK FOR THIS PROJECT IS TO BE REMOVED AND REPLACED
 WITH THE REQUIRED NEW STREET TREES, SIDEWALK, PLANTING
 BEDS AND STRUCTURAL SOIL.
  
  
 3. PROVIDE CALCULATIONS FOR REQUIRED STREET TREES AT
 MAXIMUM SPACING EVERY 30 FEET OR PORTION THEREOF FOR
 THE EVERNIA STREETSCAPE LENGTH, AND SHOW THE NUMBER
 PROVIDED PER SECTION 94-113D.2.
  
 4. PROVIDE A DIAGRAM OF THE REQUIRED AND PROVIDED
 PRIVATE OPEN SPACE AREAS FOR THE QBD-8 ZONING DISTRICT
 IN THE SITE AND ARCHITECTURAL DRAWINGS. IDENTIFY THE
 TYPE OF OPEN SPACE AS ALLOWED BY TABLE IV-7 AND
 DEFINITIONS IN SECTION 94-109. SHOW HOW THE STANDARDS
 FOR THE TYPES OF OPEN SPACE ARE MET FOR VEGETATED AREAS
 AND TREE CANOPY SQUARE FOOTAGE BASED ON TABLE IV-8 ON
 THE LANDSCAPE PLAN. LANDSCAPE PLANS MUST MATCH THE
 ARCHITECTURAL PLANS AND CLEARLY IDENTIFY THE OPEN SPACE
 TYPE THEN DEMONSTRATE HOW THE REQUIREMENTS OF THAT TYPE
 ARE MET. PROVIDE THE INFORMATION ON THE CODE
 REQUIREMENT CHART ON SHEET L-201 AND LP.1.
  
 5. PROVIDE THE BUFFER REQUIREMENT CALCULATIONS FOR THE
 WEST PROPERTY LINE LANDSCAPE BUFFER. THE EAST PROPERTY
 LINE SHOULD ALSO HAVE THE BUFFER PROVIDED ALONG THE
 ENTIRE LENGTH ESPECIALLY ALONG THE BLANK WALL.
 LANDSCAPING MUST BE PROVIDED ALONG THE NORTH PROPERTY
 LINE WHERE POSSIBLE, PROVIDE BUFFER CALCULATIONS.
  
  
 6. ARTIFICIAL TURF AREAS PROPOSED MUST MEET THE
 REQUIREMENTS OF SECTION 94-451, INCLUDING ALL AREAS
 THAT ARE ALLOWED BY CODE MUST NOT BE VISIBLE FROM A
 ROAD OR STREET.
  
  
 7. EXPLAIN IF THE EXISTING FPL TRANSMISSION LINES
 WITHIN THE ALLEY WILL STAY IN PLACE OR BE RELOCATED.
  
 8. SHOW ALL EXISTING AND PROPOSED WATER AND SEWER AND
 DRAINAGE LINES ON THE LANDSCAPE PLAN. SHOW LOCATIONS OF
 BACKFLOWS AND ADJUST LOCATIONS OF UTILITY LINES TO
 RESOLVE CONFLICTS WITH EXISTING AND PROPOSED TREES AND
 LANDSCAPING.
  
 9. PLANT LIST NEEDS TO BE MODIFIED TO INCLUDE ALL PLANT
 MATERIAL FOR THE PROJECT,
 AND SEPARATE PLANT LIST FOR EACH OPEN SPACE AREA
 PROVIDED FOR REFERENCE TO SHOW COMPLIANCE WITH THE OPEN
 SPACE TYPE REQUIREMENTS.
  
 10. PROVIDE THE FLORIDA FRIENDLY LANDSCAPE DESIGN
 OPTIONS CHART SECTION 94-446 (G) AND PROVIDE THE
 REQUIRED 50 POINTS.
  
 11. ADD COLUMNS FOR NATIVE PLANT AND DROUGHT TOLERANCE
 TO THE PLANT LIST.
  
 12. SHOW COMPLIANCE WITH SECTION 94-445 L. PLANT
 SPECIES. A MINIMUM OF 60 PERCENT OF PLANT MATERIAL
 ADDED SHALL BE FLORIDA NATIVE OR DROUGHT TOLERANT
 SPECIES SELECTED FROM THE CITY LIST OR THE LIST OF
 SPECIES IN THE MOST RECENT EDITION OF SOUTH FLORIDA
 WATER MANAGEMENT DISTRICT WATERWISE SOUTH FLORIDA
 LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE OF NATIVE AND
 DROUGHT TOLERANT PLANTS ADDED BASED ON THE PLANT LIST.
  
 13. PROVIDE SCREENING HEDGES FOR ALL GROUND MOUNTED
 VALVES AND EQUIPMENT AND ADD A NOTE THAT ALL EQUIPMENT
 WILL BE SCREENED.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE STREET TREES AND
 RIGHT OF WAY LANDSCAPING AND IRRIGATION. THIS WILL BE
 THROUGH A SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  

Review Stop PARK PARKING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop POLICE POLICE
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PU PUBLIC UTILITIES
Rev No 3 Status P Date 05-15-2023 Cont ID  
Sent By relizond Date 05-15-2023 Time 15:08 Rev Time 0.00
Received By relizond Date 05-15-2023 Time 14:40 Sent To  
Notes
2023-05-15 15:07:45CONDITIONS OF APPROVAL THAT WILL REQUIRE BEING MET
 DURING ENGINEERING REVIEW:
 -COMMENT 1 FROM PREVIOUS REVIEW NOT ADDRESSED
 -COMMENT 3 FROM PREVIOUS REVIEW NOT FULLY ADDRESSED,
 PLEASE REFER TO DETAIL GS-6 FOR CLEANOUT PLACEMENT AND
 EASEMENT REQUIREMENTS.
 -COMMENT 6 FROM PREVIOUS REVIEW NOT ADDRESSED
 -COMMENT 9 FROM PREVIOUS REVIEW NOT ADDRESSED
 -CITY STANDARDS CALL FOR DIP INSTALLATION FOR WATER
 MAIN
 -DENOTE THE CITY'S POINT OF SERVICE FOR BOTH WATER AND
 SEWER
 -SEWER CCTV INSPECTION SHOWED THAT THE CURRENT
 CONDITION OF THE PIPE MAY BE BEYOND LINING. PIPE
 REPLACEMENT WILL LIKELY NEED TO BE DISCUSSED.
  

Review Stop PU PUBLIC UTILITIES
Rev No 2 Status F Date 01-27-2023 Cont ID  
Sent By relizond Date 01-27-2023 Time 14:37 Rev Time 0.00
Received By relizond Date 01-27-2023 Time 14:35 Sent To  
Notes
2023-01-27 14:37:02-PLAN VIEW INCLUDING ROSEMARY AVENUE WOULD BE HELPFUL
 TO DISCERN EXISTING CONDITIONS
 -SEPARATE TAPS FOR WATER AND FIRE LINEWILL BE NECESSARY
 PER DETAILS WS-1 AND WS-4
 -CLEANOUT NEEDED ADJACENT TO PROPERTY LINE FOR PROPOSED
 SANITARY SEWER LATERAL SERVING GREASE TRAPS
 -REMOVE EXISTING SANITARY SEWER LATERAL UP TO PROPERTY
 LINE AND INSTALL CLEANOUT
 -CCTV OF EXISTING SEWER MAIN IN ALLEY NECESSARY TO
 DETERMINE IF THE MAIN WILL NEED TO BE LINED
 -PROVIDE PROFILE FOR PROPOSED WATER AND SEWER SERVICE
 LINES
 -PREVIOUS COMMENT REGARDING INSTALLATION OF NEW WATER
 MAIN BETWEEN SAPODILLA AND ROSEMARY NOT ADDRESSED
 -NEED MORE INFORMATION ON TAPPING METHOD OF WATER MAIN
 ON EVERNIA
 -FIRE HYDRANT NEEDS ANCHOR TEE INSTALLED (8"X6") PER
 DETAIL P-8
  
 RICKY ELIZONDO [email protected]

Review Stop PU PUBLIC UTILITIES
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By mtechnow Date 10-13-2022 Time 12:01 Sent To  
Notes
2022-10-13 12:10:37-CALL FOR ABANDONED SERVICES TO BE CUT AND CAPPED AT
 THE MAIN.
 -REVISE CALL OUT FOR PROPOSED WATER MAIN TO BE DIP.
 -CALL OUT SIZE/TYPE OF EXISITNG UTILITIES.
 -RECORDS SHOW THE PROPOSED WATER MAIN CONNECTION IS TO
 A MAIN FROM 1925. WILL BE REQUIRED TO REPLACE MAIN
 WITHIN PROJECT LIMITS, CITY WILL CONTRIBUTE TOWARDS
 SHARED COST OF WATER MAIN REPLACEMENT BETWEEN ROSEMARY
 AND SAPODILLA.
  
 MICHAEL TECHNOW [email protected]

Review Stop PU-CS PUBLIC UTILITIES CUSTOMER SRVC
Rev No 3 Status P Date 03-30-2023 Cont ID  
Sent By mhurley Date 03-30-2023 Time 15:57 Rev Time 0.00
Received By mhurley Date   Time   Sent To  
Notes
2023-03-30 15:57:28ENGINEERING PLANS WILL NEED SOME REVISIONS AT
 ENGINEERING DEVELOPMENT SUBMITTAL.

Review Stop PU-CS PUBLIC UTILITIES CUSTOMER SRVC
Rev No 2 Status F Date 01-18-2023 Cont ID  
Sent By mhurley Date 01-18-2023 Time 14:37 Rev Time 0.00
Received By mhurley Date   Time   Sent To  
Notes
2023-01-18 14:37:18PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING:
 -AT ENGINEERING DEVELOPMENT SUBMITTAL, REVISE UTILITY
 EASEMENT SUCH THAT BOUNDARIES ARE ON PRIVATE PROPERTY
 AND BACKFLOW ASSEMBLIES ARE NOT INCLUDED.
 -VERIFY PRIVATE FIRE SYSTEM WILL NOT HAVE ADDED
 CHEMICALS OR AUXILIARY WATER SUPPLY SUCH AS A WELL.
 RESPECTFULLY,
 MARK HURLEY [email protected]

Review Stop PU-CS PUBLIC UTILITIES CUSTOMER SRVC
Rev No 1 Status F Date 09-30-2022 Cont ID  
Sent By mhurley Date 09-30-2022 Time 16:48 Rev Time 0.00
Received By mhurley Date   Time   Sent To  
Notes
2022-09-30 16:48:21PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING:
 -UTILITY BILLING SYSTEM AND HISTORIC PICTURES SHOW
 EXISTING LARGE DIAMETER DEDICATED FIRELINE AND DCDA
 NEAR SE AREA OF EXISTING BUILDING. SHOW AND LABEL WHAT
 IS HAPPENING TO THE EXISTING WATER SERVICE PIPE FROM
 WATER MAIN.
 -PROPOSED 8 INCH WM CANNOT BE PVC. WOULD HAVE TO BE
 DIP.
 -PAVEMENT RESTORATION LIMITS SHOULD EXTEND FURTHER WEST
 TO ENCOMPASS REMOVED WATER SERVICES.
 -ENTIRE FLAGS OF SIDEWALK WOULD NEED BE REPLACED WHERE
 METER BOXES ARE BEING REMOVED. SHOW ON ENGINEERING
 PLAN.
 -LABEL PARKING METERS ON ENGINEERING PLAN OR ADD THE
 SYMBOL TO LEGEND.
 -A PARKING METER MAY BE ENCROACHING IN FIRE HYDRANT
 CLEARANCE AREA.
 -SHOW EXISTING AND PROPOSED FDC.
 -SHOW PROPOSED POINT OF SERVICE VALVE FOR FIRELINE.
 -ENGINEERING PLAN SHOWS A LARGE UTILITY POLE IN NORTH
 DRIVEWAY.
 -LANDSCAPING SEEMS TO CONFLICT WITH PROPOSED UTILITIES
 IN TERMS OF LOCATION. SUBMIT ADDITIONAL LANDSCAPING
 PLAN SHEET SHOWING UTILITIES AND MAKE SURE THEY ARE
 APPROPRIATELY DISTANCED FROM EACH OTHER.
 -UPDATE SHEET LP3 TO DESCRIBE WHICH LOCATION IT IS.
 -WHAT IS HAPPENING TO THE LARGE EXISTING PALM TREE AT
 SOUTHEAST CORNER OF PROPERTY?
 -ON ENGINEERING PLAN, SHOW BOTH EDGE OF NORTHERN ALLEY
 PAVEMENT AND NORTHERN ALLEY RIGHT OF WAY LINE.
 -SHOW PAVEMENT RESTORATION IN ALLEY DUE TO UTILITY
 WORK.
 -IF THE EXISTING ONE STORY RESIDENCE BUILDING AND
 DUMPSTER AREA ARE BEING REMOVED, THEN ADD DEMO PLAN
 SHEET.
 -SHOW AND LABEL PROPOSED UTILITY EASEMENT FOR WATER
 METERS ON PRIVATE PROPERTY.
 -WATER METERS 3 INCH OR LARGER NEED TO BE INSTALLED
 ABOVE-GROUND.
 -ENGINEERING PLANS SHOWS MOSTLY CONCRETE ALONG EAST
 PROPERTY LINE, BUT LANDSCAPING PLANS SHOWS MOSTLY
 LANDSCAPING AREAS.
 -NORTHEAST DRIVEWAY IS MISSING DIRECTIONAL ARROWS ON
 MOST PLAN SETS.
 -VERIFY LOCATION OF DCDA. MAY BE CLOSER TO SIDEWALK
 THAN LABELED ON ENGINEERING PLAN.
 -WILL SIZE OF FIRELINE AND DCDA BE INCREASED? IF SO,
 NOTATE ON PLAN.
 RESPECTFULLY,
 MARK HURLEY [email protected]

Review Stop PW PUBLIC WORKS
Rev No 4 Status P Date 04-28-2023 Cont ID  
Sent By   Date 04-28-2023 Time   Rev Time 0.00
Received By   Date 04-28-2023 Time   Sent To  
Notes
2023-04-28 14:37:20NO FURTHER COMMENTS.

Review Stop PW PUBLIC WORKS
Rev No 3 Status P Date 03-30-2023 Cont ID  
Sent By   Date 03-30-2023 Time   Rev Time 0.00
Received By   Date 03-30-2023 Time   Sent To  
Notes
2023-03-30 12:29:25CONDITION OF APPROVAL: ALL SANITATION GARBAGE
 CONTAINERS SHALL BE FRONT LOAD TYPE IN ORDER TO BE
 COMPATIBLE WITH THE CITY`S COLLECTION TRUCK.
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-045

Review Stop PW PUBLIC WORKS
Rev No 2 Status P Date 03-02-2023 Cont ID  
Sent By   Date 03-02-2023 Time   Rev Time 0.00
Received By   Date 03-02-2023 Time   Sent To  
Notes
2023-03-02 15:49:01CONDITION OF APPROVAL:
  
 ALL SANITATION GARBAGE CONTAINERS SHALL BE FRONT LOAD
 TYPE IN ORDER TO BE COMPATIBLE WITH THE CITY`S
 COLLECTION TRUCK.
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-045

Review Stop PW PUBLIC WORKS
Rev No 1 Status F Date 10-06-2022 Cont ID  
Sent By   Date 10-06-2022 Time   Rev Time  
Received By   Date 10-06-2022 Time   Sent To  
Notes
2022-10-06 15:58:45PLEASE PROVIDE THE FOLLOWINGS:
 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID
 WASTE VOLUME PRODUCED ALONG WITH THE SIZE, TYPE AND
 QUANTITY OF THE CONTAINER (I.E. DUMPSTER/COMPACTOR)
 THAT WILL BE UTILIZED FOR THE SANITATION SERVICE.
 2- DETAILS FOR SANITATION SERVICE (I.E. SOLID WASTE
 CONTAINER(S) TYPE, COLLECTION LOCATION, ETC.).
 3- AUTOTURN EXHIBIT WITH DYNAMIC ENVELOPE AND THE
 VEHICLE???S WHEEL PATH IDENTIFIED WITH DIFFERENT COLORS
 FOR THE SANITATION SERVICE, FRONT LOADER TRUCK WITH THE
 FOLLOWING SPECS:
 - DUAL AXLES
 - TRUCK LENGTH: 35 FT
 - TRUCK WIDTH: 11 FT
 - TURNING RADIUS:
 - SAE TURNING RADIUS: 32.5 FT
 - CURB-TO-CURB DIAMETER: 74 FT
 - WALL-TO-WALL DIAMETER: 86.3 FT
 4- DESIGNATED LOCATION FOR THE BULK ITEM PICK UP AND
 RECYCLING CONTAINERS
 5- OWNERS AND/OR OCCUPANTS OF PROPERTY THAT REQUIRE
 GREASE HAULING SERVICES SHALL ENSURE THAT THEIR GREASE
 TANKS OR CONTAINERS REMAIN CLEAN, AND ARE ENCLOSED AND
 NOT IN PUBLIC VIEW.
 6- IN CASE OF PROPOSING ADDITION OF ANY NEW CAN(S) IN
 THE CITY`S RIGHT-OF-WAY , THE LOCATION AND QUANTITY OF
 THE CAN(S) SHALL BE REVIEWED AND APPROVED BY PUBLIC
 WORKS DEPARTMENT AND THE CAN(S) SHALL BE TYPE, SIZE AND
 COLOR APPROVED BY PUBLIC WORKS DEPARTMENT. THE BUILDING
 MAINTENANCE IS RESPONSIBLE TO MAINTAIN AND SERVICE THE
 CAN(S).
 7- ALL THE PARKING STALL PAINTING SHALL COMPLY WITH THE
 CITY`S MUNICIPAL CODE SECTION 94-485 AND FLORIDA
 STATUES [553.5041 F.S.].
 8- SIGNAGE PLAN. ALL STRIPING AND SIGNAGE SHALL COMPLY
 WITH THE LATEST CITY OF WEST PALM BEACH STANDARD
 DETAILS AND MEET THE M.U.T.C.D. LATEST EDITION.
 9- ALL PAVEMENT MARKING , SIGNING AND SIDEWALK DAMAGED
 DURING CONSTRUCTION SHALL BE RESTORED.
  
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045

Review Stop STORM STORMWATER
Rev No 4 Status P Date 05-10-2023 Cont ID  
Sent By tward Date 05-10-2023 Time 09:03 Rev Time 0.00
Received By tward Date 05-10-2023 Time 09:04 Sent To  
Notes
***NONE***

Review Stop STORM STORMWATER
Rev No 3 Status   Date 05-10-2023 Cont ID  
Sent By tward Date 05-10-2023 Time 09:02 Rev Time 0.00
Received By tward Date   Time   Sent To  
Notes
***NONE***

Review Stop STORM STORMWATER
Rev No 2 Status   Date   Cont ID  
Sent By tward Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop STORM STORMWATER
Rev No 1 Status F Date 10-13-2022 Cont ID  
Sent By tward Date 10-13-2022 Time 00:08 Rev Time 0.00
Received By tward Date 10-13-2022 Time 00:09 Sent To  
Notes
2022-10-13 00:09:11THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. SHOW AND LABEL THE 2 FEET OF LANDSCAPE OVERHANG FOR
 THE GROUND FLOOR PARKING SPACES.
  
 2. UNDERGROUND PARKING MAY PRECLUDE THE USE DRAINAGE
 STRUCTURES AND EXFILTRATION TRENCH ON THE GROUND FLOOR.
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH
 THE ENGINEERING PERMIT SUBMITTAL.
  
 2. PROVIDE COPY OF SFWMD ERP PERMIT BEFORE START OF
 CONSTRUCTION.
  
 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  

Review Stop SURVEY SURVEYING
Rev No 2 Status P Date 04-18-2023 Cont ID  
Sent By vnoel Date 04-18-2023 Time 10:42 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
2023-04-18 10:43:36UNITY OF TITLE REQUIRED PRIOR TO T.C.O.

Review Stop SURVEY SURVEYING
Rev No 1 Status F Date 10-11-2022 Cont ID  
Sent By vnoel Date 10-11-2022 Time 13:47 Rev Time  
Received By vnoel Date   Time   Sent To  
Notes
2022-10-11 13:53:441. ADD CONVERSION TO NGVD-29 TO SURVEY AND ENG. PLANS.
 2. UNITY OF TITLE WILL BE REQUIRED.
 3. ADD PROPOSED UTILITIES TO LANDSCAPE PLAN.MAY
 CONFLICT IN SE CORNER.

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 4 Status P Date 06-06-2023 Cont ID  
Sent By   Date 06-06-2023 Time   Rev Time 0.00
Received By   Date 06-06-2023 Time   Sent To  
Notes
2023-06-06 18:43:59APPROVED WITH THE FOLLOWING CONDITIONS:
 1) ALLEY TO BE REPAVED THROUGHOUT ITS ENTIRETY FROM
 SAPODILLA TO ROSEMARY. CORRESPONDING ONE-WAY SIGNS E
 AND PAVEMENT MARKINGS MUST BE INSTALLED EXTENSIVELY AND
 EXHAUSTIVELY
 2) PROVIDE A DRAFT TDM PLAN TO BE REVIEWED AND APPROVED
 BY TRAFFIC ENGINEERING
  
  
 TRAFFIC COMMENTS
 1) WAIVED/APPROVED BY ADMIN. PROVIDE A FULL DETAILED
 TRAFFIC STUDY. NOTE: THE STUDY MUST BE PRESENTED IN A
 SEPARATE DOCUMENT THAN THE INSIGNIFICANT TIS. PLEASE
 COMPLETE THE STUDY, INCLUSIVE OF TEST 2, AND PROVIDE
 SUMMARY TABLES HIGHLIGHTING DEFICIENCIES AND/OR LEVEL
 OF SERVICE DEGRADATION, IF ANY; A SITE PLAN SHOULD BE
 PROVIDED. HCM ANALYSIS FOR THE EVERNIA DRIVEWAY SHOULD
 BE PROVIDED TO PROVE THAT A LEFT-TURN LANE WOULD NOT BE
 NECESSARY. PLEASE KEEP IN MIND THAT COUNTY CONCURRENCY
 DOES NOT NECESSARILY IMPLY CITY CONCURRENCY, AND THE
 FACT THAT THE PROPOSED DEVELOPMENT IS WITHIN A TCEA
 DOES NOT PRECLUDE THE CITY TO REQUEST FURTHER ANALYSIS
 2) SATISFIED. PROVIDE COUNTY TPS LETTER, ONCE RECEIVED
 3) WAIVED/APPROVED BY ADMIN. PROVIDE TRANSPORTATION
 DEMAND MANAGEMENT (TDM) MEASURES. NONE WERE PROPOSED IN
 THE LATEST RESUBMISSION, EVEN THOUGH A SECTION IN THE
 TRAFFIC STATEMENT WAS TITLED AS SUCH.
  
 SITE COMMENTS
 4) WAIVED/APPROVED BY ADMIN. PROVIDE A TRANSPORTATION
 SPECIFIC SITE PLAN FOR THE GROUND FLOOR. SHOWCASING
 TRANSPORTATION RELATED FEATURES (E.G. ROADWAY WIDTHS,
 DRIVING AISLES, PARKING STALLS, SIDEWALK, CURB, GUTTER,
 DRIVEWAY, GATES, CROSSWALKS, VISIBILITY TRIANGLE,
 CORNER & DRIVEWAY SEPARATION DISTANCES, SLOPES, ETC.)
 PROPERLY LABELED AND DIMENSIONED. THE SITE PLAN SHOULD
 BE NAMED T1. SEVERAL TRANSPORTATION ITEMS AND
 CORRESPONDING DIMENSIONS ARE MISSING, PLEASE REVISE.
 5) WAIVED/APPROVED BY ADMIN. IN THE T1 SITE PLAN,
 PLEASE SHOWCASE BASIC CURB DETAILS (E.G. DRIVEWAY, CURB
 CUTS, PAVEMENT MARKINGS, PARKING STALLS, ETC.) ON THE
 OPPOSITE SIDE OF THE ROADS SURROUNDING THE PROPOSED
 DEVELOPMENT
 6) WAIVED/APPROVED BY ADMIN PROVIDE A SIGNAGE AND
 PAVEMENT MARKING PLAN, WHICH COULD BE A SEPARATE
 DOCUMENT OR INCLUDED IN THE T1 SITE PLAN. SEVERAL
 SIGNAGE AND PAVEMENT MARKINGS, ESPECIALLY RELATED TO
 THE ALLEY ARE MISSING
 7) WAIVED/APPROVED BY ADMIN. PROVIDE AUTOTURN ANALYSIS
 FOR GARBAGE TRUCK AND/OR SERVICE VEHICLES DRIVING IN
 AND OUT OF THE PROPOSED DEVELOPMENT WITH VEHICLE
 DYNAMIC ENVELOPES AND WHEEL PATHS CLEARLY DISTINCT AND
 DEFINED IN DIFFERENT COLORS. PLEASE PROVIDE A HIGHER
 RESOLUTION BACKGROUND IMAGE, INSERT EXACT MEASUREMENTS
 OF ALLEY WIDTH, AS THE ACTUAL DRIVABLE SURFACE IS MUCH
 LESS THAN 11-FEET. ANY OBSTRUCTION, SUCH AS LIGHT POLES
 AND TREES MUST BE IDENTIFIED AND TAKEN INTO ACCOUNT.
 THERE ARE MAJOR ENCROACHMENTS SHOWN AT THE MOMENT.
 8) SATISFIED. PROVIDE A PARKING TABLE SHOWCASING THE
 NUMBER OF REQUIRED AND PROVIDED PARKING SPACES,
 INCLUSIVE OF ADA AND BICYCLE ONES
 9) SATISFIED. ARE THERE ANY GATES PROPOSED? IF SO,
 CLEARLY SHOWCASE THE REQUIRED 20 FEET SETBACK DISTANCE
 FROM THE BACK OF THE SIDEWALK OR EDGE OF TRAVEL LANES
 10) SATISFIED. IS VALET SERVICE PROPOSED? IF SO,
 PROVIDE AN OPERATIONAL ANALYSIS
 11) CONDITION. ALLEY SHOULD BE DESIGNATED ONE-WAY,
 INSTALL PAVEMENT MARKINGS AND SIGNAGE ACCORDINGLY.
 PLEASE COORDINATE WITH PUBLIC WORKS PERTAINING
 PREFERRED DIRECTIONALITY. THE PROPOSED DEVELOPMENT IS
 GENERATING A SIGNIFICANT NUMBER OF NEW TRIPS THAT WILL
 TRAVERSE THE ALLEY; THUS, IN ORDER TO PROVIDE SAFE AND
 OPTIMAL VEHICULAR OPERATIONS, PROPER MITIGATION
 MEASURES, SUCH AS RE-PAVEMENT WITH AT LEAST
 ONE-AND-ONE-HALF-INCH ASPHALT THICKNESS, EXTENSIVE
 SIGNAGE AND PAVEMENT MARKINGS, AND REMOVAL OF OBSTACLES
 AND OBSTRUCTIONS ARE WARRANTED. PLEASE DO SHOW THE
 EFFECTIVE PAVEMENT WIDTH, BASED ON ACTUAL & CURRENT
 FIELD MEASUREMENTS AND OBSERVATIONS.
 12) WAIVED/APPROVED BY ADMIN. SHOWCASE THE ALLEYWAY AND
 ALL RELATED TRANSPORTATION FEATURES THROUGHOUT ITS
 ENTIRE LENGTH FROM SAPODILLA TO ROSEMARY. LATEST
 TRANSPORTATION SITE PLAN IS EXTREMELY DEFICIENT IN
 ADDRESSING THIS COMMENT.
 13) WAIVED/APPROVED BY ADMIN. THE PROPOSED LOADING ZONE
 DOES NOT SEEM PROPERLY LOCATED FOR SAFE AND ATTAINABLE
 VEHICULAR OPERATIONS AND MANEUVERINGS. A DEDICATED AND
 MORE DETAILED (E.G. SHOWCASE EXACT ROAD CONFIGURATION,
 HIGHLIGHT ANY OBSTRUCTIONS/OBSTACLES, ETC.) AUTOTURN
 ANALYSIS SHOULD BE PERFORMED TO PROVE ITS FEASIBILITY
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  
  
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 3 Status F Date 04-19-2023 Cont ID  
Sent By   Date 04-19-2023 Time   Rev Time 0.00
Received By   Date 04-19-2023 Time   Sent To  
Notes
2023-04-19 11:15:25TRAFFIC COMMENTS
 1) SATISFIED. PROVIDE A FULL DETAILED TRAFFIC STUDY.
 NOTE: THE STUDY MUST BE PRESENTED IN A SEPARATE
 DOCUMENT THAN THE INSIGNIFICANT TIS. PLEASE COMPLETE
 THE STUDY, INCLUSIVE OF TEST 2, AND PROVIDE SUMMARY
 TABLES HIGHLIGHTING DEFICIENCIES AND/OR LEVEL OF
 SERVICE DEGRADATION, IF ANY; A SITE PLAN SHOULD BE
 PROVIDED. HCM ANALYSIS FOR THE EVERNIA DRIVEWAY SHOULD
 BE PROVIDED TO PROVE THAT A LEFT-TURN LANE WOULD NOT BE
 NECESSARY. PLEASE KEEP IN MIND THAT COUNTY CONCURRENCY
 DOES NOT NECESSARILY IMPLY CITY CONCURRENCY, AND THE
 FACT THAT THE PROPOSED DEVELOPMENT IS WITHIN A TCEA
 DOES NOT PRECLUDE THE CITY TO REQUEST FURTHER ANALYSIS
 2) PARTIALLY SATISFIED. PROVIDE COUNTY TPS LETTER WITH
 UPDATED LAND USE INTENSITY, ONCE RECEIVED
 3) APPROVED/WAIVED BY KEVIN VOLBRECHT. PROVIDE
 TRANSPORTATION DEMAND MANAGEMENT (TDM) MEASURES. NONE
 WERE PROPOSED IN THE LATEST RESUBMISSION, EVEN THOUGH A
 SECTION IN THE TRAFFIC STATEMENT WAS TITLED AS SUCH.
 SITE COMMENTS
 4) PARTIALLY SATISFIED. PROVIDE A TRANSPORTATION
 SPECIFIC SITE PLAN FOR THE GROUND FLOOR. SHOWCASING
 TRANSPORTATION RELATED FEATURES (E.G. ROADWAY WIDTHS,
 DRIVING AISLES, PARKING STALLS, SIDEWALK, CURB, GUTTER,
 DRIVEWAY, GATES, CROSSWALKS, VISIBILITY TRIANGLE,
 CORNER & DRIVEWAY SEPARATION DISTANCES, SLOPES, ETC.)
 PROPERLY LABELED AND DIMENSIONED. THE SITE PLAN SHOULD
 BE NAMED T1. ONE-WAY SIGNAGE AND PAVEMENT MARKINGS
 ALONG THE PORTION OF THE ALLEY WEST OF THE PROPOSED
 DEVELOPMENT ARE MISSING. INSTALL WRONG-WAY/DO-NOT-ENTER
 SIGNAGE JUST WEST OF EACH DRIVEWAY ABUTTING THE ALLEY
 AND AT ITS EASTERN END ON ROSEMARY AVE. LOADING ZONE
 SIGNAGE IS MISSING
 5) SATISFIED. IN THE T1 SITE PLAN, PLEASE SHOWCASE
 BASIC CURB DETAILS (E.G. DRIVEWAY, CURB CUTS, PAVEMENT
 MARKINGS, PARKING STALLS, ETC.) ON THE OPPOSITE SIDE OF
 THE ROADS SURROUNDING THE PROPOSED DEVELOPMENT
 6) PARTIALLY SATISFIED. PROVIDE A SIGNAGE AND PAVEMENT
 MARKING PLAN, WHICH COULD BE A SEPARATE DOCUMENT OR
 INCLUDED IN THE T1 SITE PLAN. SEVERAL SIGNAGE AND
 PAVEMENT MARKINGS, ESPECIALLY RELATED TO THE ALLEY ARE
 MISSING, PLEASE SHOWCASE ALL FEATURES THROUGHOUT THE
 ALLEY EXTENSION.
 7) NOT SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE
 TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND OUT OF THE
 PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES AND
 WHEEL PATHS CLEARLY DISTINCT AND DEFINED IN DIFFERENT
 COLORS. PLEASE PROVIDE A HIGHER RESOLUTION BACKGROUND
 IMAGE, INSERT EXACT MEASUREMENTS OF ALLEY WIDTH, AS THE
 ACTUAL DRIVABLE SURFACE IS MUCH LESS THAN 11-FEET. ANY
 OBSTRUCTION, SUCH AS LIGHT POLES AND TREES MUST BE
 IDENTIFIED AND TAKEN INTO ACCOUNT. AUTOTURN SHOWS
 ENCROACHMENTS WITH THE SIDEWALK AREA AT THE WESTERN END
 OF THE ALLEY. MOREOVER, PLEASE SHOWCASE THE MANDATORY
 18-INCH HORIZONTAL CLEARANCE TO VERTICAL OBSTRUCTIONS
 (REFERENCE: HTTPS://HIGHWAYS.DOT.GOV/SAFETY/RWD/PROVIDE
 -SAFE-RECOVERY/CLEAR-ZONES/CLEAR-ZONES ) FOR EACH OF
 THE POLES AND TREES ALONG THE ALLEY. PLEASE DRAW AN
 18-INCH RADIUS CIRCLE AROUND EACH OBSTRUCTING OBJECT
 ALONG THE ALLEY; PLEASE MITIGATE ANY ENCROACHMENT
 ACCORDINGLY
 8) SATISFIED. PROVIDE A PARKING TABLE SHOWCASING THE
 NUMBER OF REQUIRED AND PROVIDED PARKING SPACES,
 INCLUSIVE OF ADA AND BICYCLE ONES
 9) SATISFIED. ARE THERE ANY GATES PROPOSED? IF SO,
 CLEARLY SHOWCASE THE REQUIRED 20 FEET SETBACK DISTANCE
 FROM THE BACK OF THE SIDEWALK OR EDGE OF TRAVEL LANES
 10) SATISFIED. IS VALET SERVICE PROPOSED? IF SO,
 PROVIDE AN OPERATIONAL ANALYSIS
 11) NOT SATISFIED. ALLEY SHOULD BE DESIGNATED ONE-WAY,
 INSTALL PAVEMENT MARKINGS AND SIGNAGE ACCORDINGLY.
 PLEASE COORDINATE WITH PUBLIC WORKS PERTAINING
 PREFERRED DIRECTIONALITY. THE PROPOSED DEVELOPMENT IS
 GENERATING A SIGNIFICANT NUMBER OF NEW TRIPS THAT WILL
 TRAVERSE THE ALLEY; THUS, IN ORDER TO PROVIDE SAFE AND
 OPTIMAL VEHICULAR OPERATIONS, PROPER MITIGATION
 MEASURES, SUCH AS RE-PAVEMENT WITH AT LEAST
 ONE-AND-ONE-HALF-INCH ASPHALT THICKNESS, EXTENSIVE
 SIGNAGE AND PAVEMENT MARKINGS, AND REMOVAL OF OBSTACLES
 AND OBSTRUCTIONS ARE WARRANTED. PLEASE DO SHOW THE
 EFFECTIVE PAVEMENT WIDTH, BASED ON ACTUAL & CURRENT
 FIELD MEASUREMENTS AND OBSERVATIONS. PER COMMENT #4
 PLEASE SHOWCASE ALL SIGNS AND PAVEMENT MARKINGS IN THE
 TRANSPORTATION PLAN. PLEASE PROVIDE ACKNOWLEDGEMENT FOR
 THE REPAVEMENT OF THE ALLEY THROUGHOUT ITS FULL LENGTH.
 THE LATEST AUTOTURN MUST BE UPDATED PER COMMENT #7
 12) PARTIALLY SATISFIED. SHOWCASE THE ALLEYWAY AND ALL
 RELATED TRANSPORTATION FEATURES THROUGHOUT ITS ENTIRE
 LENGTH FROM SAPODILLA TO ROSEMARY. AT THE EASTERN END
 OF THE ALLEY PLEASE SHOWCASE ALL NEARBY OBSTRUCTIONS
 (I.E. LANDSCAPE ISLANDS, PROPERTY FENCE AND BUILDING
 CORNER) NEED TO BE PROPERLY DEPICTED
 13) NOT SATISFIED. THE PROPOSED LOADING ZONE DOES NOT
 SEEM PROPERLY LOCATED FOR SAFE AND ATTAINABLE VEHICULAR
 OPERATIONS AND MANEUVERINGS. A DEDICATED AND MORE
 DETAILED (E.G. SHOWCASE EXACT ROAD CONFIGURATION,
 HIGHLIGHT ANY OBSTRUCTIONS/OBSTACLES, ETC.) AUTOTURN
 ANALYSIS SHOULD BE PERFORMED TO PROVE ITS FEASIBILITY.
 PROVIDED AUTOTURN SHOWS SEVERAL ENCROACHMENTS. PLEASE
 UPDATE IT BY USING THE LATEST TRANSPORTATION SITE PLAN
 AS BACKGROUND
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 2 Status F Date 02-28-2023 Cont ID  
Sent By   Date 02-28-2023 Time   Rev Time 0.00
Received By   Date 02-28-2023 Time   Sent To  
Notes
2023-02-28 19:55:59TRAFFIC COMMENTS
 1) PARTIALLY SATISFIED. PROVIDE A FULL DETAILED TRAFFIC
 STUDY. NOTE: THE STUDY MUST BE PRESENTED IN A SEPARATE
 DOCUMENT THAN THE INSIGNIFICANT TIS. PLEASE COMPLETE
 THE STUDY, INCLUSIVE OF TEST 2, AND PROVIDE SUMMARY
 TABLES HIGHLIGHTING DEFICIENCIES AND/OR LEVEL OF
 SERVICE DEGRADATION, IF ANY; A SITE PLAN SHOULD BE
 PROVIDED. HCM ANALYSIS FOR THE EVERNIA DRIVEWAY SHOULD
 BE PROVIDED TO PROVE THAT A LEFT-TURN LANE WOULD NOT BE
 NECESSARY. PLEASE KEEP IN MIND THAT COUNTY CONCURRENCY
 DOES NOT NECESSARILY IMPLY CITY CONCURRENCY, AND THE
 FACT THAT THE PROPOSED DEVELOPMENT IS WITHIN A TCEA
 DOES NOT PRECLUDE THE CITY TO REQUEST FURTHER ANALYSIS
 2) SATISFIED. PROVIDE COUNTY TPS LETTER, ONCE RECEIVED
 3) NOT SATISFIED. PROVIDE TRANSPORTATION DEMAND
 MANAGEMENT (TDM) MEASURES. NONE WERE PROPOSED IN THE
 LATEST RESUBMISSION, EVEN THOUGH A SECTION IN THE
 TRAFFIC STATEMENT WAS TITLED AS SUCH.
  
 SITE COMMENTS
 4) PARTIALLY SATISFIED. PROVIDE A TRANSPORTATION
 SPECIFIC SITE PLAN FOR THE GROUND FLOOR. SHOWCASING
 TRANSPORTATION RELATED FEATURES (E.G. ROADWAY WIDTHS,
 DRIVING AISLES, PARKING STALLS, SIDEWALK, CURB, GUTTER,
 DRIVEWAY, GATES, CROSSWALKS, VISIBILITY TRIANGLE,
 CORNER & DRIVEWAY SEPARATION DISTANCES, SLOPES, ETC.)
 PROPERLY LABELED AND DIMENSIONED. THE SITE PLAN SHOULD
 BE NAMED T1. SEVERAL TRANSPORTATION ITEMS AND
 CORRESPONDING DIMENSIONS ARE MISSING, PLEASE REVISE.
 5) NOT SATISFIED. IN THE T1 SITE PLAN, PLEASE SHOWCASE
 BASIC CURB DETAILS (E.G. DRIVEWAY, CURB CUTS, PAVEMENT
 MARKINGS, PARKING STALLS, ETC.) ON THE OPPOSITE SIDE OF
 THE ROADS SURROUNDING THE PROPOSED DEVELOPMENT
 6) PARTIALLY SATISFIED. PROVIDE A SIGNAGE AND PAVEMENT
 MARKING PLAN, WHICH COULD BE A SEPARATE DOCUMENT OR
 INCLUDED IN THE T1 SITE PLAN. SEVERAL SIGNAGE AND
 PAVEMENT MARKINGS, ESPECIALLY RELATED TO THE ALLEY ARE
 MISSING
 7) NOT SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE
 TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND OUT OF THE
 PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES AND
 WHEEL PATHS CLEARLY DISTINCT AND DEFINED IN DIFFERENT
 COLORS. PLEASE PROVIDE A HIGHER RESOLUTION BACKGROUND
 IMAGE, INSERT EXACT MEASUREMENTS OF ALLEY WIDTH, AS THE
 ACTUAL DRIVABLE SURFACE IS MUCH LESS THAN 11-FEET. ANY
 OBSTRUCTION, SUCH AS LIGHT POLES AND TREES MUST BE
 IDENTIFIED AND TAKEN INTO ACCOUNT. THERE ARE MAJOR
 ENCROACHMENTS SHOWN AT THE MOMENT.
 8) SATISFIED. PROVIDE A PARKING TABLE SHOWCASING THE
 NUMBER OF REQUIRED AND PROVIDED PARKING SPACES,
 INCLUSIVE OF ADA AND BICYCLE ONES
 9) SATISFIED. ARE THERE ANY GATES PROPOSED? IF SO,
 CLEARLY SHOWCASE THE REQUIRED 20 FEET SETBACK DISTANCE
 FROM THE BACK OF THE SIDEWALK OR EDGE OF TRAVEL LANES
 10) SATISFIED. IS VALET SERVICE PROPOSED? IF SO,
 PROVIDE AN OPERATIONAL ANALYSIS
 11) NOT SATISFIED. ALLEY SHOULD BE DESIGNATED ONE-WAY,
 INSTALL PAVEMENT MARKINGS AND SIGNAGE ACCORDINGLY.
 PLEASE COORDINATE WITH PUBLIC WORKS PERTAINING
 PREFERRED DIRECTIONALITY. THE PROPOSED DEVELOPMENT IS
 GENERATING A SIGNIFICANT NUMBER OF NEW TRIPS THAT WILL
 TRAVERSE THE ALLEY; THUS, IN ORDER TO PROVIDE SAFE AND
 OPTIMAL VEHICULAR OPERATIONS, PROPER MITIGATION
 MEASURES, SUCH AS RE-PAVEMENT WITH AT LEAST
 ONE-AND-ONE-HALF-INCH ASPHALT THICKNESS, EXTENSIVE
 SIGNAGE AND PAVEMENT MARKINGS, AND REMOVAL OF OBSTACLES
 AND OBSTRUCTIONS ARE WARRANTED. PLEASE DO SHOW THE
 EFFECTIVE PAVEMENT WIDTH, BASED ON ACTUAL & CURRENT
 FIELD MEASUREMENTS AND OBSERVATIONS.
 12) NOT SATISFIED. SHOWCASE THE ALLEYWAY AND ALL
 RELATED TRANSPORTATION FEATURES THROUGHOUT ITS ENTIRE
 LENGTH FROM SAPODILLA TO ROSEMARY. LATEST
 TRANSPORTATION SITE PLAN IS EXTREMELY DEFICIENT IN
 ADDRESSING THIS COMMENT.
 13) THE PROPOSED LOADING ZONE DOES NOT SEEM PROPERLY
 LOCATED FOR SAFE AND ATTAINABLE VEHICULAR OPERATIONS
 AND MANEUVERINGS. A DEDICATED AND MORE DETAILED (E.G.
 SHOWCASE EXACT ROAD CONFIGURATION, HIGHLIGHT ANY
 OBSTRUCTIONS/OBSTACLES, ETC.) AUTOTURN ANALYSIS SHOULD
 BE PERFORMED TO PROVE ITS FEASIBILITY
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status F Date 10-13-2022 Cont ID  
Sent By   Date 10-13-2022 Time   Rev Time  
Received By   Date 10-13-2022 Time   Sent To  
Notes
2022-10-13 07:48:59TRAFFIC COMMENTS
 1) PROVIDE A FULL DETAILED TRAFFIC STUDY. NOTE: THE
 STUDY MUST BE PRESENTED IN A SEPARATE DOCUMENT THAN THE
 INSIGNIFICANT TIS
 2) PROVIDE COUNTY TPS LETTER, ONCE RECEIVED
 3) PROVIDE TRANSPORTATION DEMAND MANAGEMENT (TDM)
 MEASURES
  
 SITE COMMENTS
 4) PROVIDE A TRANSPORTATION SPECIFIC SITE PLAN FOR THE
 GROUND FLOOR. SHOWCASING TRANSPORTATION RELATED
 FEATURES (E.G. ROADWAY WIDTHS, DRIVING AISLES, PARKING
 STALLS, SIDEWALK, CURB, GUTTER, DRIVEWAY, GATES,
 CROSSWALKS, VISIBILITY TRIANGLE, CORNER & DRIVEWAY
 SEPARATION DISTANCES, SLOPES, ETC.) PROPERLY LABELED
 AND DIMENSIONED. THE SITE PLAN SHOULD BE NAMED T1
 5) IN THE T1 SITE PLAN, PLEASE SHOWCASE BASIC CURB
 DETAILS (E.G. DRIVEWAY, CURB CUTS, PAVEMENT MARKINGS,
 PARKING STALLS, ETC.) ON THE OPPOSITE SIDE OF THE ROADS
 SURROUNDING THE PROPOSED DEVELOPMENT
 6) PROVIDE A SIGNAGE AND PAVEMENT MARKING PLAN, WHICH
 COULD BE A SEPARATE DOCUMENT OR INCLUDED IN THE T1 SITE
 PLAN
 7) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND/OR
 SERVICE VEHICLES DRIVING IN AND OUT OF THE PROPOSED
 DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES AND WHEEL
 PATHS CLEARLY DISTINCT AND DEFINED IN DIFFERENT COLORS
 8) PROVIDE A PARKING TABLE SHOWCASING THE NUMBER OF
 REQUIRED AND PROVIDED PARKING SPACES, INCLUSIVE OF ADA
 AND BICYCLE ONES
 9) ARE THERE ANY GATES PROPOSED? IF SO, CLEARLY
 SHOWCASE THE REQUIRED 20 FEET SETBACK DISTANCE FROM THE
 BACK OF THE SIDEWALK
 10) IS VALET SERVICE PROPOSED? IF SO, PROVIDE AN
 OPERATIONAL ANALYSIS
 11) ALLEY SHOULD BE DESIGNATED ONE-WAY, INSTALL
 PAVEMENT MARKINGS AND SIGNAGE ACCORDINGLY. PLEASE
 COORDINATE WITH PUBLIC WORKS PERTAINING PREFERRED
 DIRECTIONALITY
 12) SHOWCASE THE ALLEYWAY AND ALL RELATED
 TRANSPORTATION FEATURES THROUGHOUT ITS ENTIRE LENGTH
 FROM SAPODILLA TO ROSEMARY
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop Z ZONING
Rev No 3 Status F Date 04-18-2023 Cont ID  
Sent By cibaven Date 04-18-2023 Time 16:04 Rev Time 0.00
Received By cibaven Date 04-18-2023 Time 15:58 Sent To  
Notes
2023-04-18 15:59:19PLANNING AND ZONING DIVISION
 PROJECT: VIANA HOTEL & SPA 609 EVERNIA STREET
 (Z22090016)
 DATE: APRIL 18, 2023
 CONTACT: CLAUDIA IBAVEN, CITY URBAN DESIGNER, AT
 561-822-1402 OR VIA [email protected].
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 GENRAL COMMENTS
 1. PENDING TO RECEIVED SCAD AND FAA LETTERS. ALL PUBLIC
 UTILITIES LETTERS RECEIVED. TPS RECEIVED.
 2. ALLEY UTILITY POLE CLOSER TO DRIVEWAY AND LOADING
 ZONE WILL NEED TO BE RELOCATED TO MINIMIZE IMPACTS.
 PLEASE UPDATE ANY APPROPRIATE PLANS.
 3. MINOR EDIT ON THE JUSTIFICATION STATEMENT, AS THIS
 DEVELOPMENT IS USING TDR???S THE REQUIREMENTS TO MEET
 ARE FOR THE QBD ??? 8-12 SUBDISTRICT AND NOT QBD 8
 SUBDISTRICT, PLEASE REVISE.
 4. RENDERINGS NEED TO MATCH DRAWINGS, SOME PALM TREES
 ARE SHOWN COMPARED TO SHADE TREES ON THE STREET
 PROPOSED, STREET STRIPPING IS NOT SHOWN ON RENDERINGS,
 SOME FRONT FACADE TREATMENTS ARE SHOWN ON RENDERING BUT
 DO NOT MATCH THE ELEVATION DRAWINGS, FOR EXAMPLE, A
 GREEN WALL IS PROPOSED ON SHEET B7, BUT RENDERING DO
 NOT SHOW IT. PLEASE REVISE RENDERINGS TO ACCURATELY
 MATCH DRAWINGS. WE ENCOURAGE YOU TO PLEASE PROVIDE
 RENDERINGS SHOWING PRIVATE OPEN SPACES AS THEY SEEM TO
 BE IMPORTANT OF THE OVERALL DESIGN CONCEPT.
 5. THE TITLE OF ALL PROPERTY ON WHICH REQUIRED PARKING
 AND LOADING IS PROVIDED SHALL BE UNIFIED WITH THE TITLE
 OF ALL PROPERTY ON WHICH THE USES SERVED ARE LOCATED. A
 CONDITION OF APPROVAL WILL BE THAT A UNITY OF TITLE IS
 REQUIRED PRIOR T.C.O.
 6. JUSTIFICATION STATEMENT WILL NEED TO BE REVISE IF
 ANOTHER VARIANCE IS REQUESTED. CRITERIA FOR GRANTING
 VARIANCE, SEC. 94-38 (D)(6), WILL NEED TO BE ADDRESS
 FOR EACH VARIANCE.
  
  
  
 ZONING DIAGRAMS AND CALCULATIONS
 1. PLEASE CLARIFY WHY ON SHEET Z-1, LEVEL MEZZANINE
 THERE ARE 'PLANTING AREAS' THAT ARE EXCLUDED FROM YOUR
 FAR CALCULATIONS.
 2. THE PROPOSED DEVELOPMENT MEETS THE HEIGHT
 REQUIREMENT.
 3. RELATED TO PRIVATE OPEN SPACE, PLEASE REVISE THE
 FOLLOWING MINOR EDITS TO SHEETS: PLEASE REFERENCE ON
 SHEET A1, OTHER SHEETS LIKE B20 AND LANDSCAPE SHEETS AS
 THEY PROVIDE INFORMATION RELATED TO THE REQUIREMENT.
 SHEET B20 ONLY PROVIDES AREA OF OPEN SPACES AND
 OVERHEAD CALCULATIONS, AND LANDSCAPE SHEETS PROVIDE
 INFORMATION VEGETATION AND TREE CANOPY CALCULATIONS.
 NOTE, ON LANDSCAPE PLANS YOU LABELED SPACES AS ???OPEN
 SPACE A???, B, AND C, PLEASE DO THE SAME ON SHEET B20
 FOR CONSISTENCY.
 4. ACTIVE USE ON GROUND FLOOR 30 PERCENT REQUIREMENT,
 AS YOU REDESIGNED THE SPACE IN-FRONT OF THE LOBBY AND
 CREATED A BETTER CONNECTION TO THE STREET, YOU CAN
 COUNT IT AS ACTIVE USE. PLEASE REMOVE THE SPACE WITH
 THE RAMP BETWEEN THE SALON AND PLANTERS FROM ACTIVE USE
 CALCULATIONS.
 5. ACTIVE USE LINER DEPTH REQUIREMENTS, PLEASE REVISE
 ACCORDINGLY SINCE PLANS WILL CHANGE BASED ON COMMENT
 NO. 4.
 6. TRANSPARENCY REQUIREMENT, PLEASE REVISE ACCORDINGLY
 SINCE PLANS WILL CHANGE BASED ON COMMENT NO. 4.
 7. PLEASE NOTE, SHEET B18 ONLY SHOWS FLOOR PLANS WITH
 NO ELEVATION TO SHOW ANY TRANSPARENCY REQUIREMENTS AS
 APPLICANT MENTIONED IN PREVIOUS RESPONSES.
 8. PLEASE NOTE, REQUIREMENTS FOR TRANSPARENCY,
 FENESTRATION AND FACADE ARTICULATION FOR THE HISTORIC
 BUILDING WILL NOT NEED TO BE MET IF THE FACADES ARE
 BEING PRESERVE. IF AN ALTERATION IS PROPOSED, THEN
 FACADES WILL NEED TO MEET THE REQUIREMENTS. PLEASE
 CLARIFY IF ALL FACADES ARE BEING PRESERVED, AND IF
 ALTERED, PROVIDE ANY CALCULATIONS AND DIAGRAMS ON HOW
 THEY MEET THE REQUIREMENTS.
 9. PLEASE PROVIDE HOW THE GROUND FLOOR AND PODIUM
 (ACTIVE USE) MEETS AT LEAST 15% OF FENESTRATION PER
 SEC. 94-109, TABLE IV-4.
 10. PLEASE REVISE REAR SETBACK LINES SHOWN ON SHEETS
 B4, B5, B6, B8 B9, B12, AND B13 SHOULD BE 5 FEET FROM
 GROUND TO THE 12 FLOORS.
 11. PLEASE REVISE MINOR TYPO ON SHEET A1, MAX. BUILDING
 FOOTPRINT FROM "TOWER: 6 TO 12 (155FEET)" TO "TOWER:6
 TO 12 (152 FEET)".
 12. PLEASE REVISE DIAGRAMS AND CALCULATIONS FOR MAX.
 BUILDING FOOTPRINT INFORMATION SHOWN ON SHEET B19. SEE
 DEFINITION OF FOOTPRINT PER SEC. 94-109, FOOTPRINT
 CALCULATIONS SHALL EXCLUDE BALCONIES, AND OTHER AREAS.
  
  
 ARCHITECTURAL DRAWINGS
 1. REPEATED COMMENT, PLEASE NOTE THAT THE RETAIL SQUARE
 FOOTAGE IS DIFFERENT BETWEEN SHEETS. SHEET A1.2 HAS
 736SF, SHEET T1, Z1, B1, B12, AND B18 HAVE 786SF. AND
 NOTE, ON REVISED TPS LETTER RETAIL IS SHOWING AS 788SF.
 2. REPEATED COMMENT, INFORMATION IS NEEDED ABOUT THE
 GREEN WALL MATERIAL BEING USED ON THE FRONT FACADE,
 ESPECIALLY IF THIS IS PROPOSED AS AN ARCHITECTURAL
 TREATMENT, AND WILL NEED TO BE INCLUDED IN THE
 DRAWINGS. NOTE, RENDERINGS WILL NEED TO MATCH DRAWINGS.
 3. ON SHEET B14, PLANE B, PLEASE CLARIFY WITH
 CALCULATIONS IF THIS AREA IS LESS THAN 20 PERCENT OF
 THE ENTIRE FACADE ELEVATION TO NOT BE CONSIDERED A
 'BLANK WALL' PER DEFINITION IN SEC. 94-109. IF GREATER
 THAN 20 PERCENT, FACADE ARTICULATION WILL NEED TO BE
 PROVIDED.
 4. PLEASE NOTE, IT IS UNCLEAR WHAT REQUIREMENT YOU ARE
 SHOWING ON SHEETS B14-B17. ON SHEET B7, YOU SHOW THE
 ARCHITECTURAL TREATMENT THAT IS GIVEN TO FACADES
 ENCLOSING PARKING SPACES (NON-ACTIVE USE). SO, SHEETS
 B14-B17 SEEM TO BE SHOWING FENESTRATION REQUIREMENTS
 BUT SOME PERCENTAGES ARE LESS THAN 15 PERCENT WHICH DO
 NOT MEET THE REQUIREMENT.
 5. THE PLANTER WALL ON THE EAST SIDE WILL NEED TO BE
 LOWERED, SEE SHEET R1 SHOWING A HIGHER WALL COMPARED TO
 ELEVATION ON SHEET B14 WHERE THE WALL IS 2 FEET 8
 INCHES FEET WHICH WORKS BETTER FROM THE STREET LEVEL.
  
  
 PARKING
 1. NOTE - PENDING CONFIRMATION FROM THE TRAFFIC
 ENGINEERING DEPARTMENT THAT ON-STREET PARKING CAN BE
 COUNTED TOWARDS REQUIRED PARKING.
 2. PLEASE PROVIDE A DETAIL WITH DIMENSIONS OF YOUR BIKE
 STORAGE ROOM. AS REQUIRED PER SEC. 94-111(I), THE ROOM
 WILL NEED ACCOMMODATE 4 BICYCLES. SEE THE CITY'S
 BICYCLE PARKING GUIDELINES PAGE 4 FOR MORE INFO ABOUT
 DIMENSIONS AND AREA. YOU CAN ADD DETAIL TO SHEET A1.2.
 3. IN ADDITION TO THE BICYCLE PARKING REQUIRED ON THE
 COMMENT 2, PER SEC. 94-113(D)(9), BICYCLE PARKING FOR 2
 BICYCLES IS REQUIRED ON STREET. PLEASE MAKE SURE TO
 ACKNOWLEDGE THIS REQUIREMENT IN YOUR TABLES ON SHEETS
 A1.2 AND A1. NOTE, BIKE RACKS ARE IN CONFLICT WITH
 LANDSCAPING AREA, PLEASE REVISE.
 4. SITE VISIBILITY TRIANGLES FACING EVERNIA STREET WILL
 NEED TO BE MOVE TO THE LINE WHERE THE STREET R/W
 STARTS. SEE SEC. 94-305(E), FIGURE X-1.
 5. PLEASE CLARIFY IF A GATE IS PROPOSED ON THE
 EXITS/ENTRANCES TO PARKING ON THE STREET LEVEL.
 6. PLEASE UPDATE AUTORUN ANALYSIS BASED ON DISCUSSIONS
 REGARDING THE RELOCATION OF THE UTILITY POLE BETWEEN
 LOADING ZONE AND DRIVEWAY, AND ANY OTHER APPROPRIATE
 SHEETS.
 7. PLEASE ADD SLOPE PERCENTAGE ON ADA RAMP ACCESSING
 THE SALON.
  
  
 LANSCAPE AND STREETSCAPE
 1. IF THE MAX. SPACING BETWEEN ON-STREET TREES IS
 GREATER THAN 30 FEET, A VARIANCE WILL NEED TO BE
 REQUESTED. THE TWO TREES FRAMING THE DRIVEWAY DO NOT
 MEET THE REQUIREMENT, PLEASE REVISE.
 2. BICYCLE RACKS ON THE WEST SIDE OF THE LOT ARE IN
 CONFLICT WITH LANDSCAPING PROPOSED, PLEASE REVISE TO
 ENSURE THAT ENOUGH SPACE CAN ACCOMMODATE TWO BICYCLES
 ON EACH SIDE. IF SPACE ALLOWS, BIKE RACKS CAN MOVE
 CLOSER TO THE SIDEWALK SO A LANDSCAPE BUFFER CAN BE
 ADDED PARALLEL TO THE STREET, BETWEEN PARKING AND BIKE
 RACK TO BETTER SCREEN PARKING.
 3. THE PROPOSED ON-STREET TREE IN FRONT OF THE HISTORIC
 BUILDING CONFLICTS WITH THE AWNING, PLEASE REVISE.
 4. PLEASE NOTE, STREET LIGHTS FIXTURES ARE NOT SHOWN ON
 LANDSCAPE SHEET LP.1. PLEASE ADD TO ENSURE TREES ARE
 NOT IN CONFLICT WITH PLACEMENT. NOTE, CITY STANDARD FOR
 DECORATIVE STREETLAMPS IS LUMEC (S55-007).
 5. ON ARCHITECTURAL SHEETS, DRIVEWAYS' APRONS AND CURB
 RADIUS DO NOT MATCH LANDSCAPE AND ENGINEERING SHEETS,
 PLEASE REVISE. ALL PLANS SHOULD BE CONSISTENT IN
 DESIGN.
 6. PLEASE NOTE VEGETATED AREAS, PER DEFINITION FOUND IN
 SEC. 94-109, NEED TO BE OCCUPIED BY PLANT MATERIAL.
 PLANT MATERIAL MEANS NATURAL GRASS, GROUND COVER,
 SHRUBS, HEDGES, VINES AND TREES. YOU ARE PROPOSING
 ARTIFICIAL TURF ON OPEN SPACES AREAS, THESE ARTIFICIAL
 TURF AREAS CANNOT BE COUNTED TOWARDS THE MIN.
 PERCENTAGE REQUIRED OF VEGETATION AREA OF OPEN SPACES,
 PLEASE REVISE.
 7. ANY ARTIFICIAL TURF AREA PROPOSED MUST MEET THE
 REQUIREMENTS OF SECTION 94-451.
  
  
 OTHER COMMENTS
 1. A SIGNAGE PERMIT WILL NEED TO BE SUBMITTED TO
 APPROVE THE 'VIANA' SIGN.
 2. PLEASE NOTE, AS PER SEC. 94-54 (A)(1), THE APPLICANT
 SHALL ADDRESS ANY COMMENTS OF THE PPRC AND SUBMIT A
 REVISED APPLICATION WITHIN 60 DAYS OF THE DATE OF SUCH
 COMMENTS. FAILURE TO MAKE THE REQUIRED SUBMITTALS
 WITHIN THE 60-DAY DEADLINE WILL DEEM THE APPLICATION AS
 WITHDRAWN. AT LEAST 15 DAYS PRIOR TO THE EXPIRATION OF
 THE 60-DAY REVISION PERIOD, THE APPLICANT MAY REQUEST A
 30-DAY EXTENSION. NO FURTHER EXTENSION REQUEST IS
 PERMITTED. COMMENTS RELATING TO REVISED APPLICATIONS
 SHALL BE ADDRESSED WITHIN 30 DAYS OF THE DATE OF SUCH
 COMMENTS.
 3. WHEN RESUBMITTING, WRITTEN RESPONSES TO COMMENTS
 NEED TO BE PROVIDED AS WELL AS A MINIMUM OF TWO (2)
 PAPER COPIES AND AN ELECTRONIC COPY IN .PNG/.PDF FORMAT
 OF ALL PLANS AND ALL DOCUMENTATION REQUIRED IN THE
 APPLICATION. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS
 TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL
 COMMENTS.
 4. LASTLY, YOU WERE PERMITTED ONE (1) RESUBMITTAL AT NO
 ADDITIONAL COST. AS PREVIOUSLY ISSUED COMMENTS CONTINUE
 TO NOT BE SUFFICIENTLY ADDRESSED, THE APPLICANT WILL BE
 ASSESSED A RESUBMITTAL FEE. SUCH FEE WILL BE 20% OF THE
 ORIGINAL APPLICATION FEE, WHICH IS $300.
  

Review Stop Z ZONING
Rev No 2 Status F Date 02-03-2023 Cont ID  
Sent By cibaven Date 02-03-2023 Time 10:17 Rev Time 0.00
Received By cibaven Date 02-03-2023 Time 10:17 Sent To  
Notes
2023-02-03 10:04:30ZONING AND PLANNING
 PROJECT: VIANA HOTEL & SPA 609 EVERNIA STREET Z22090016
 DATE: FEBRUARY 2, 2023
 CONTACT: CLAUDIA IBAVEN, CITY URBAN DESIGNER, AT
 561-822-1402 OR VIA [email protected].
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION AND
 PROVIDE THE FOLLOWING COMMENTS:
 PLEASE NOTE, I AM ADDING A 'Z' ON COMMENTS MADE BY THE
 ZONING DEPARTMENT AND AN 'A' ON COMMENTS MADE BY
 APPLICANT. FEEL FREE TO CONTACT CLAUDIA IBAVEN VIA
 EMAIL, IF YOU WOULD LIKE A WORD DOCUMENT OF THE
 COMMENTS BELOW.
  
  
 GENERAL COMMENTS
  
 COMMENT 1
 Z - THE PROJECT CANNOT EXCEED 79,800 SQ. FT. (MAXIMUM
 FAR OF 4). THERE ARE ERRORS AND DISCREPANCIES IN THE
 FAR CALCULATIONS THAT COULD EXCEED THE ALLOWABLE FAR.
  
 A - THE PROJECT FAR IS 79,768 SF. THIS IS IDENTIFIED ON
 DIAGRAMS AND CALCULATIONS ON SHEET Z-1.
  
 Z 02.02.23 - PARTIALLY SATISFIED. ON SHEET A1, PLEASE
 REFERENCE SHEETS THAT ARE SHOWING DIAGRAMS AND
 BREAKDOWN OF CALCULATIONS. ON SHEET Z-1, THE LOBBY
 LEVEL IS SHOWING DOTTED RED LINES NOT OUTSIDE OF THE
 FACE OF THE EXTERIOR WALLS, PARTICULARLY THE LOBBY AND
 BATHROOM AREAS, PLEASE REVISE. AND, PLEASE FEEL FREE TO
 SPLIT SHEET A1 INTO TWO SHEETS, ONE AS A SITE PLAN AND
 THE OTHER AS PROJECT DATA CALCULATIONS WITH ALL TABLES.
  
  
 COMMENT 2
 Z - THE COUNTY TPS LETTER PROVIDED FOR THE PROJECT DOES
 NOT ACCURATELY REFLECT THE COMMERCIAL/RETAIL SQUARE
 FOOTAGE FOR THE PROJECT AS PROVIDED IN THE PLANS. THE
 TPS LETTER SHALL BE REVISED TO ACCURATELY REFLECT THE
 CORRECT COMMERCIAL RETAIL SQUARE FOOTAGE TO AVOID
 COUNTING ANY GHOST TRIPS.
  
 A - THIS PROJECT IS IN A TCEA AND TPS APPROVAL IS NOT
 REQUIRED. WE HAVE INFORMED QUAZI BARI THAT THE
 DEVELOPMENT PLAN HAS CHANGED SLIGHTLY IN A TCEA (SEE
 EMAIL DATED DECEMBER 12, 2022).
  
 Z 02.02.23 - NOT SATISFIED. A TRAFFIC LETTER PROVIDED
 BY THE PALM BEACH COUNTY TRAFFIC DIVISION IS REQUIRED
 AS PART OF THE APPLICATION. THE LETTER PROVIDED DATED
 ON SEPT. 26, 2022, WILL NEED TO BE UPDATED TO REFLECT
 ACCURATELY THE PROPOSED DEVELOPMENT.
  
  
 COMMENT 3
 Z - PROVIDE WRITTEN CONFIRMATION THAT THE PUBLIC
 UTILITIES DEPARTMENT HAS REVIEWED THE PROPOSAL FOR
 WATER, SEWAGE TREATMENT, STORM DRAINAGE AND GARBAGE
 COLLECTION SERVICES. PLEASE CONTACT THE CITY OF WEST
 PALM BEACH ENGINEERING SERVICES DEPARTMENT (561)
 494-1040.
  
 A - PLEASE SEE WRITTEN REVIEW COMMENTS FROM PUBLIC
 WORKS, AND WRITTEN RESPONSES TO SAID COMMENTS IN THIS
 LETTER.
  
 Z 02.02.23 - NOT SATISFIED. WRITTEN CONFIRMATION
 DOCUMENT WILL NEED TO BE SUBMITTED AS PART OF YOUR
 APPLICATION/RESUBMITTAL PACKAGE FOR OUR RECORDS.
  
  
 COMMENT 4
 Z - PROVIDE LETTERS FROM ALL PUBLIC UTILITIES
 CONFIRMING THAT THE PROPOSED PROJECT DOES NOT ENCROACH
 INTO THEIR EASEMENTS OR OTHERWISE INTERFERE WITH THE
 PROVISIONS OF THEIR SERVICES: AT&T, FPU, FPL AND
 COMCAST.
  
 A - SURVEY AND PLANS SUBMITTED SHOW NO ENCROACHMENTS
 INTO EASEMENTS. LETTERS FROM UTILITIES WILL BE PROVIDED
 AT BUILDING PERMITTING.
  
 Z 02.02.2023 - NOT SATISFIED. AS REQUIRED FOR SITE PLAN
 APPROVAL, LETTERS FROM ALL PUBLIC UTILITIES WILL NEED
 TO BE PROVIDED IN YOUR RESUBMITTAL PACKAGE FOR OUR
 RECORDS.
  
  
 COMMENT 5
 Z- WHAT ARE THE PROVISIONS FOR THE EXISTING UTILITIES
 (I.E. UTILITY POLES, ETC.)? ARE ANY IMPROVEMENTS
 PROPOSED WITHIN THE ALLEY? PLEASE PROVIDE MORE
 INFORMATION.
  
 A - EXISTING UTILITIES ARE TO REMAIN UNLESS CALLED OUT.
 FOR EXAMPLE, THE UTILITY POLE IN THE NORTHWEST
 DRIVEWAY, AS WELL AS SEVERAL EXISTING WATER METERS,
 WATER SERVICE CONNECTIONS, AND PARTIAL SANITARY
 CONNECTIONS HAVE BEEN LABELED TO BE REMOVED. A PROPOSED
 SANITARY CONNECTION TO THE GRAVITY SEWER WILL ALSO
 REQUIRE PAVEMENT RESTORATION IN THE ALLEY.
  
 Z 02.02.23 - NOT SATISFIED. ON THE CONCEPTUAL PAVING,
 DRAINAGE, WATER AND WASTEWATER PLAN SHEET IT CALLS OUT
 ONE UTILITY POLE TO BE RELOCATED BUT THERE SEEMS TO BE
 AT LEAST A COUPLE ON THE ALLEY, PLEASE CLARIFY WHAT
 WILL HAPPEN TO THOSE AND LABEL CORRECTLY. PLEASE
 CLEARLY SHOW THE EXISTING R/W LINE. NOTE, THE RADIUS OF
 THE CURB-CUT OR APRON ON THE DRIVEWAYS ENCROACHES INTO
 THE ALLEY, PLEASE ADJUST TO BE WITHIN PROPERTY LINE.
 AND NO STAIRS, RAMPS OR OTHER STRUCTURES CAN BE WITHIN
 THE MINIMUM SETBACK, PLEASE ADJUST.
  
  
 COMMENT 6
 Z - MORE INFORMATION IS REQUIRED ON THE COMMERCIAL
 COMPONENT OF THE PROJECT. IS THE COMMERCIAL SPACE FOR
 HOTEL GUESTS ONLY OR IS IT OPEN TO THE GENERAL PUBLIC?
 PARKING CALCULATIONS ARE REQUIRED FOR ANY
 COMMERCIAL/RETAIL SPACE.
  
 A - THE HOTEL SPA AND SALON AND RESTAURANT AND BAR ARE
 AMENITIES FOR HOTEL GUESTS LIKE THOSE DESCRIBED IN THE
 DEFINITIONS OF HOTEL, FULL SERVICE AND HOTEL, BOUTIQUE.
 ?? 94-109, ZLDRS. PARKING CALCULATIONS ARE PROVIDED AT
 SHEET A1 BASED UPON SECTION 94-111, ZLDRS AND TABLE
 IV-9 (PROVIDING PARKING REQUIREMENTS FOR HOTEL
 RESTAURANT AND PUBLIC MEETING AREAS AND COMMERCIAL
 USES).
  
 Z 02.02.23 - PARTIALLY SATISFIED. PLEASE CLARIFY WHAT
 SPACES OF THE DEVELOPMENT ARE OPEN TO THE PUBLIC IN
 GENERAL. PLEASE CLARIFY IF THE CAFE IS OPEN TO THE
 PUBLIC AND IF THE RESTAURANT/BAR IS ON THE GROUND FLOOR
 LABEL AS 'BUFFET' AND 'BAR', AND IF THIS SPACE IS ALSO
 OPEN TO THE PUBLIC.
  
  
 COMMENT 7
 Z - PROVIDE A LETTER ENSURING FAA COMPLIANCE (A
 DETERMINATION OF NO HAZARD) IN REGARD TO THE HEIGHT OF
 ANY TOWERS OR STRUCTURES WITHIN THE DESIGNATED FLIGHT
 PATH.
  
 A - TO THE EXTENT ANY FAA LETTER IS REQUIRED, IT WILL
 BE PROVIDED PRIOR TO BUILDING PERMITTING. THE APPLICANT
 NOTES THAT THERE ARE SIGNIFICANTLY HIGHER BUILDINGS IN
 THE AREA, SO THERE WILL NOT BE ANY ISSUE WITH THE
 FLIGHT PATH.
  
 Z 02.02.2023 - NOT SATISFIED. AS REQUIRED FOR SITE PLAN
 APPROVAL, FAA LETTER WILL NEED TO BE PROVIDED IN YOUR
 RESUBMITTAL PACKAGE FOR OUR RECORDS.
  
  
 COMMENT 8 - NEW COMMENT
 Z 02.02.23 - PLEASE NOTE, THE APPLICANT WILL NEED TO
 PROVIDE INFORMATION ON HOW IT WILL MEET THE PUBLIC ART
 REQUIREMENT PRIOR TO PRESENTING TO DAC AND FOR SITE
 PLAN APPROVAL. THERE IS NOT ENOUGH INFORMATION PROVIDED
 TO UNDERSTAND HOW THE DEVELOPMENT MEETS THE
 REQUIREMENT.
  
  
  
  
 JUSTIFICATION STATEMENT
  
 COMMENT 1
 Z - THE PROJECT WILL BE UTILIZING TDRS. PLEASE REVISE
 THE JUSTIFICATION STATEMENT TO INCLUDE ANY PERTINENT
 INFORMATION/HISTORY ON THE TDRS ACQUIRED FOR THE
 PROJECT. IT IS IMPORTANT TO PROVIDE ALL BACKGROUND
 INFORMATION ON THE PROPOSED PROJECT.
  
 A - THE JUSTIFICATION STATEMENT IDENTIFIES THE TDRS
 THAT HAVE BEEN ACQUIRED FROM THE SEABOARD TRAIN STATION
 (CERTIFICATE OF TRANSFER 22-11).
 Z 02.02.23 - SATISFIED.
  
  
 COMMENT 2
 Z - PROVIDE BACKGROUND INFORMATION ON THE PRESERVATION
 OF THE EXISTING HOTEL EVERNIA AND ANY DISCUSSIONS HAD
 WITH THE CITY'S HISTORIC PRESERVATION PLANNER(S).
  
 A - THE JUSTIFICATION STATEMENT HAS BEEN UPDATED TO
 REFERENCE PRIOR DISCUSSIONS WITH THE CITY'S HISTORIC
 PRESERVATION PLANNER RELATIVE TO THE INTEGRATION OF THE
 HOTEL EVERNIA STRUCTURE INTO THE PROJECT.
  
 Z 02.02.23 - SATISFIED.
  
  
 COMMENT 3
 Z - HAS THERE BEEN ANY PUBLIC OUTREACH REGARDING THE
 PROPOSED PROJECT?
  
 A - THE APPLICANT HAS SCHEDULED A MEETING WITH THE
 DOWNTOWN NEIGHBORHOOD ASSOCIATION ON FEBRUARY 1, 2023.
  
 Z 02.02.23 - IN YOUR RESUBMITTAL PACKAGE, PLEASE
 INCLUDE DOCUMENTATION OF THE MEETING HELD ON 02.01.23
 AND ANY LETTERS OF SUPPORT. IN ADDITION, PLEASE NOTE
 PER SEC. 94-39 (J)(4) AND SEC. 94-54 (B)(3), THE
 PROPOSED DEVELOPMENT WILL NEED TO MEET PROCEDURES OF
 NOTICES OF PUBLIC MEETINGS.
  
  
 COMMENT 4 - NEW COMMENT
 Z 02.02.23 - AS PER SEC. 94-54 (B), ADD TO
 JUSTIFICATION LETTER RESPONSE TO EACH SPECIAL REVIEW
 STANDARDS. PLEASE PROVIDE ONE DOCUMENT, THE
 JUSTIFICATION LETTER, THAT INCLUDES THE INFORMATION
 ABOUT TDR'S, THE HISTORIC BUILDING BACKGROUND INFO, THE
 PROPOSED DEVELOPMENT, AND RESPONSES ON THE SPECIAL
 REVIEW AND VARIANCE STANDARDS
  
  
  
  
 DIAGRAMS REQUESTED
  
 COMMENT 1
 Z - SEPARATE DIAGRAM SHEETS SHALL BE REQUIRED TO
 DEMONSTRATE COMPLIANCE WITH THE FOLLOWING (SIMILAR TO
 THE FAR DIAGRAMS) ??? REQUIRED AND PROPOSED INFORMATION
 REQUESTED ON THE SHEET(S) FOR: A) BUILDING SETBACKS; B)
 BUILDING FOOTPRINT (FOR LOT AREA <50,000 SQ. FT.); C)
 OPEN SPACE (PRIVATE ONLY; PUBLIC NOT REQUIRED); D)
 ACTIVE USE REQUIREMENT E.) TRANSPARENCY REQUIREMENT; F)
 ACTIVE USE LINER DEPTH REQUIREMENT; G) FA??ADE
 ARTICULATION REQUIREMENTS (I.E. FENESTRATION,
 HORIZONTAL PROJECTIONS, ARCHITECTURAL FEATURES, BLANK
 WALL, ETC.).
  
 A - ADDITIONAL DIAGRAM SHEETS ARE INCLUDED WITH THIS
 RESUBMITTAL RELATIVE TO EACH ITEM NOTED.
  
 Z 02.02.23 - PARTIALLY SATISFIED. AS MENTIONED ABOVE,
 ON SHEET A1, PLEASE REFERENCE SHEETS THAT ARE SHOWING
 DIAGRAMS AND BREAKDOWN OF CALCULATIONS.
  
 HEIGHT DIAGRAMS: PLEASE CLARIFY IF SHEET B7 YOU ARE
 SHOWING THE BUILDING HEIGHT DIMENSION MEETING THE
 REQUIREMENT. IF SO, PLEASE REFERENCE ON A1 TABLE.
 PLEASE REVIEW SEC. 94-109 DEFINITION 'HEIGHT' ON HOW TO
 MEASURE IT. ALSO SEE ARCHITECTURAL COMMENTS.
  
 OPEN SPACE: PLEASE CLARIFY, WHICH SHEET IS PROVIDING
 THE BREAKDOWN OF THE 5,647SQ.FT OF OPEN SPACE PROPOSED
 AND NOTED ON SHEET A1. NOTE, ADDING UP THE SQ.FT. ON
 SHEETS HP.1, HP.2, HP.3 DOES NOT MATCH WITH THE
 PROPOSED. MAKE SURE YOU ARE DEFINING THE TYPE OF OPEN
 SPACE AS PER SEC. 94-109, TABLE IV-6 AND MEETS
 REQUIREMENTS ON TABLE IV-7.
  
 PLEASE CREATE A NEW SHEET DIAGRAM OR PERHAPS REWORK
 SHEET B1, TO SHOW GROUND FLOOR PLAN AND GROUND FLOOR
 ELEVATION PLANS TO CLEARLY PROVIDE CALCULATIONS AND
 DIMENSIONS FOR ACTIVE USE, ACTIVE USE LINER DEPTH,
 TRANSPARENCY, AND FENESTRATION REQUIREMENTS. FOR MORE
 INFORMATION ABOUT THESE REQUIREMENTS, SEE SEC. 94-109,
 TABLE IV-4 AND SEC. 94-132, TABLE IV-46. SEE ALSO SITE
 PLAN COMMENTS, COMMENT #5 & #8.
  
  
 COMMENT 2
 Z - ALSO NOTE THAT ACTIVE USES ARE REGULATED AS A
 PERCENTAGE OF THE BUILDABLE LOT FRONTAGE (NOT THE
 ACTUAL BUILDING FRONTAGE AS PROVIDED IN THE PLANS).
 PLEASE REFER TO REQUIREMENTS AND DIAGRAMS IN ARTICLE
 IV.
  
 A - THE ACTIVE USES ARE IDENTIFIED BASED ON THE
 BUILDABLE LOT FRONTAGE.
  
 Z 02.02.23 - NOT SATISFIED. PLEASE REVIEW DEFINITION OF
 'ACTIVE USE' AND 'ACTIVE USE, GROUND FLOOR' ON SEC.
 94-109. REVISE TABLE ON SHEET A1 TO SHOW THE REQUIRED
 30% OF THE BUILDABLE LOT FRONTAGE. SHEET B1, SHOWS
 AREAS HIGHLIGHTED IN GREEN AS ACTIVE USE, THE ONLY AREA
 THAT CAN BE DESIGNATED AS ACTIVE USE, AS PER DEFINITION
 ON SEC. 94-109, IS THE 'SALON'. PLEASE REVISE PLANS TO
 MEET THE CODE. ON REVISED PLANS, MAKE SURE TO ADD THE
 DIMENSION OF THE 'BUILDING LOT FRONTAGE'. AND, AS
 SUGGESTED ABOVE, FEEL FREE TO CREATE A NEW SHEET TO
 CLEARLY SHOW HOW YOU MEET THE REQUIREMENTS FOR ACTIVE
 USE AND ACTIVE USE LINER DEPTH.
  
  
  
  
  
 ZONING AND TABULAR COMMENTS (SHEET A1)
  
 COMMENT 1
 Z - THE ZONING DISTRICT IS QBD 8-12 STORY RECEIVING
 SITE.
  
 A - ACKNOWLEDGED.
  
 Z 02.02.23 - SATISFIED. ON SHEET A1 REFLECTS THE RIGHT
 DISTRICT, THANK YOU.
  
  
 COMMENT 2
 Z - CHECK THE PROVIDED PARKING COUNT (IT DOES NOT
 APPEAR TO BE 52 PARKING SPACES AS NOTED).
  
 A - PARKING DATA HAS BEEN EVALUATED AND UPDATED.
  
 Z 02.02.23 - NOT SATISFIED. CALCULATIONS SHOW 55
 PARKING SPACES ARE PROVIDED, 5 OUT OF THOSE REQUIRED
 SPACES ARE FOR MOTORCYCLES AND, ACCORDING SEC 94-111
 (J), 8 MOTORCYCLE PARKING SPACES MAY BE PERMITTED IN
 LIEU OF 4 STANDARD PARKING SPACES, WHICH MEANS IF YOU
 ARE PROVIDE 5, 2 CAN COUNT TOWARDS YOUR TOTALS. PLEASE
 NOTE, PER SEC. 94-111 (F): ON-STREET PARKING, EXISTING
 OR PROPOSED ON-STREET PARKING SPACES MAY COUNT TOWARD
 REQUIRED PARKING WHEN APPROVED BY THE CITY PARKING
 ADMINISTRATOR AND THE CITY TRAFFIC ENGINEER. YOU MIGHT
 WANT TO EXPLORE THIS TO HELP WITH YOUR PARKING
 REQUIREMENTS.
  
 PLEASE NOTE, ON SHEET T1, PARKING SPACES ON GROUND
 LEVEL ARE 16FT IN LENGTH INSTEAD OF 18FT, PLEASE REVIEW
 ALL PARKING SPACES, ITS DIMENSIONS, AND REVISE
 ACCORDINGLY. IN ADDITION, AS PER SEC. 94-111 (C)(1), IF
 A STALL IS ADJACENT TO A WALL OR OTHER PHYSICAL
 OBSTRUCTION THE STALL WIDTHS SHALL BE INCREASED BY A
 MINIMUM OF 1FT, PLEASE REVISE.
  
 ADA ACCESS FROM THE SIDEWALK TO THE MAIN ENTRANCE OF
 THE HOTEL SHOULD BE PROVIDED.
  
  
 COMMENT 3
 Z- INFORMATION ON THE REQUIRED MINIMUM AND MAXIMUM
 BUILDING SETBACK INFORMATION SHALL BE PROVIDED. THIS
 INFORMATION IS NECESSARY TO DEMONSTRATE COMPLIANCE AS
 THE BUILDING MUST LOCATED WITHIN THE REQUIRED SETBACK
 RANGE.
  
 A - THE INFORMATION IS PROVIDED ON SHEET A-1.
  
 Z 02.02.23 - PARTIALLY SATISFIED. ON SHEETS B1 AND B12
 PARKING LEVEL, STAIRS AND RAMPS ON THE BUILDING LOT
 FRONTAGE FACING THE ALLEY ARE LOCATED WITHIN THE 5FT
 REAR SETBACK AREA, PLEASE REVISE AS NOT STRUCTURES CAN
 BE WITHIN THE MINIMUM REAR SETBACK. IN ADDITION, PLEASE
 MAKE SURE TO ADD THE MINIMUM REAR SETBACK LINE TO ALL
 FLOORS. NOTE, ON SHEETS B1-6 AND B12 AND B13, YOU CAN
 SHOW THE REQUIRED SETBACK LINES WITH DIMENSIONS, YOU
 CAN TAKE OUT ANY OTHER DIMENSIONS LABELED AS 'SETBACKS'
 SINCE THE REVIEWER WILL BE ABLE TO SEE THAT BUILDING
 FACES ARE NOT WITHIN THE SETBACK LINES. AS A
 SUGGESTION, YOU CAN USE A DIFFERENT COLOR FOR THE
 SETBACK LINES TO DIFFERENTIATE FROM OTHER DRAWING LINES
 ON SHEETS B1-12, JUST LIKE YOU SHOW ON SHEETS B12 AND
 B13. LASTLY, PLEASE ADD SETBACK LINES IN ELEVATIONS.
  
  
 COMMENT 4
 Z - INCORRECT INFORMATION IS PROVIDED FOR THE ALLOWABLE
 AND PROPOSED BUILDING FOOTPRINT. INFORMATION PROVIDED
 MUST BE CONSISTENT WITH THE ZLDRS.
  
 A - THE INFORMATION HAS BEEN UPDATED.
  
 Z 02.02.23 - NOT SATISFIED. PLEASE PROVIDE A SHEET WITH
 DIAGRAMS SHOWING WHERE THESE CALCULATIONS ARE COMING
 FROM. FOR MORE INFORMATION ABOUT BUILDING FOOTPRINT
 PLEASE SEE SEC. 94-109. IN ADDITION, PLEASE REVISE
 MINOR TYPOS 'TOWER:4 TO 5(68')' AND 'TOWER: 6 TO 12
 (152')' ON SHEET A1.
  
  
 COMMENT 5
 Z - THE MINIMUM GROUND TO 12 (152') REQUIRED
 INFORMATION FOR BUILDING SETBACKS IS INCORRECT IN THE
 TABLE. PLEASE ADDRESS FOR CONSISTENCY.
  
 A - THE TABLE HAS BEEN UPDATED.
  
 Z 02.02.23 - SATISFIED.
  
  
 COMMENT 6
 Z - PARKING CALCULATIONS (REQUIRED AND PROVIDED) SHALL
 BE BROKEN DOWN BY USE. ALSO INCLUDE PARKING
 CALCULATIONS FOR COMPACT PARKING, DISABLED PARKING,
 BICYCLE PARKING, LOADING ZONES, ETC.
  
 A - THE PARKING DATA IS NOW BROKEN DOWN BY USE AND
 PARKING CALCULATIONS BY TYPE (COMPACT, DISABLED,
 PARKING, LOADING) IS PROVIDED IN THE PARKING TABLE AT
 SHEET A-1. THE APPLICANT HAS FURTHER INCLUDED A
 VARIANCE REQUEST FOR THE REDUCTION TO ONE LOADING SPACE
 THAT IS PROVIDED ON THE PLANS.
  
 Z 02.02.23 - SEE COMMENT #2 FOR MORE ABOUT PARKING
 CALCULATIONS AND REQUIREMENTS.
  
  
 COMMENT 7
 Z - CHECK THE PROVIDED PARKING COUNT (IT DOES NOT
 APPEAR TO BE 52 PARKING SPACES AS NOTED).
  
 A - PARKING DATA HAS BEEN EVALUATED AND UPDATED ON
 SHEET B-1.
  
 Z 02.02.23 - SEE COMMENT #2 FOR MORE ABOUT PARKING
 CALCULATIONS AND REQUIREMENTS.
  
  
 COMMENT 8
 Z - THE PLANS SHOULD REFERENCE THE TRANSFER OF
 DEVELOPMENT RIGHTS (TDRS) PROGRAM (CERTIFICATE NO.
 22-11) AND HOW MUCH ADDITIONAL BUILDING SQUARE FOOTAGE
 WILL BE ADDED TO THE PROJECT BASED ON THE PURCHASE AND
 UTILIZATION OF TDRS. IT IS IMPORTANT TO UNDERSTAND WHY
 AND HOW THE PROJECT CAN EXCEED THE REQUIREMENTS OF THE
 QBD-8 DISTRICT (BASE ZONING FOR THE PROJECT SITE)
 ILLUSTRATED/NOTED IN THE PLAN.
  
 A - A NOTE REGARDING THE CERTIFICATE OF TRANSFER
 (CERTIFICATE NO. 22-11) CONVEYING 44,895 SQUARE FEET
 FROM THE SENDING SITE AT 205 S. TAMARIND AVENUE TO THE
 PROJECT SITE (609, 613 & 617 EVERNIA STREET) HAS BEEN
 ADDED TO THE SITE PLAN (SHEET A1).
  
 Z 02.02.23 - SATISFIED.
  
  
 COMMENT 9
 Z - THE CODE SUMMARY INFORMATION SHALL REFERENCE THE
 CITY OF WEST PALM BEACH (NOT PALM BEACH COUNTY).
 A - THE SUMMARY INFORMATION HAS BEEN CORRECTED.
 Z 02.02.23 - SATISFIED.
  
  
  
  
  
 SITE PLAN COMMENTS
  
 COMMENT 1
 Z - PER THE ZLDRS, "GROSS BUILDING AREA" MEANS THE
 TOTAL FLOOR AREA OF A BUILDING, INCLUDING
 AIR-CONDITIONED OR FULLY ENCLOSED STORAGE SPACES,
 ENCLOSED AREAS ON THE ROOFTOP, SUCH AS BATHROOMS AND
 LOBBIES, STAIRS AND ELEVATOR AREAS, AND EXTERNAL
 UNENCLOSED CIRCULATION AREAS. THE FAR DIAGRAMS DO NOT
 APPEAR TO BE ACCURATE. PLEASE ENSURE ALL DIAGRAMS AND
 CALCULATIONS DEFINED AS THE GROSS BUILDING AREA ARE
 INCLUDED IN THE FAR CALCULATIONS. MAKE ANY CORRECTIONS
 WHERE NECESSARY. [ZLDR S.94-109]
  
 A - FAR HAS BEEN UPDATED. PLEASE SEE DIAGRAM SHEET Z-1.
 Z 02.02.23 - PARTIALLY SATISFIED. SEE GENERAL COMMENTS,
 COMMENT #1.
  
 COMMENT 2
 Z - PER THE ZLDRS, THE MEZZANINE SHALL BE COUNTED
 TOWARD THE MAXIMUM ALLOWABLE FAR. ACCORDING TO THE
 PLAN, THE MEZZANINE HAS BEEN EXCLUDED FROM THE FAR
 CALCULATIONS. [ZLDR S.94-109]
  
 A - THE MEZZANINE AREA HAS BEEN INCLUDED IN FAR
 CALCULATIONS.
 Z 02.02.23 - SATISFIED.
  
  
 COMMENT 3
 Z - THE BUILDING SETBACK ON EVERNIA STREET (SECONDARY
 STREET) SHALL BE MEASURED FROM THE BACK OF CURB (NOT
 THE PROPERTY LINE AS PROVIDED IN THE PLANS). THE
 MINIMUM BUILDING SETBACK IS 12 FT. AND THE MAXIMUM
 BUILDING SETBACK IS 35 FT. THE BUILDING ALONG EVERNIA
 STREET MUST BE WITHIN THIS SETBACK RANGE. ALSO, PLEASE
 CLEARLY PROVIDE THE ACCURATE DIMENSIONS TO DEMONSTRATE
 COMPLIANCE. [ZLDR S.94-109 AND S.94-132, TABLE IV-46]
  
 A - REVISED DIMENSIONS ARE IDENTIFIED ON FLOOR PLANS.
  
 Z 02.02.23 - PARTIALLY SATISFIED. SEE ZONING AND
 TABULAR COMMENTS, COMMENT #3.
  
  
 COMMENT 4
 Z - CURB CUTS, PARKING ENTRANCES, EXISTING AND
 DRIVEWAYS SHALL NOT BE WIDER THAN 25 FT. AS MEASURED
 PARALLEL TO THE STREET AT THE CURB. NO DIMENSIONS HAVE
 BEEN PROVIDED IN THE PLANS TO DEMONSTRATE COMPLIANCE
 WITH THIS REQUIREMENT. [ZLDR S.94-111]
  
 A - PLEASE SEE UPDATED DIMENSIONS ON SHEET B-1 AND
 CIVIL PLANS INCLUDED WITH THIS RESUBMITTAL.
  
 Z 02.02.23 - WE RECOMMEND MAKING THE DRIVEWAY ON
 EVERNIA STREET ONE LINE TO REDUCE THE IMPACT ON
 PEDESTRIANS AND STREETSCAPE. THIS CHANGE WILL HELP WITH
 PLACEMENT OF STOP SIGN AND STREET TREES WITHOUT
 EXCEEDING THE MAX SPACING BETWEEN TREES. IT COULD ALSO
 PROVIDE MORE SPACE TO INCORPORATE ADA RAMP(S) TO ENTER
 THE MAIN ENTRANCE OF THE BUILDING.
  
  
 COMMENT 5
 Z - PROVIDE MORE INFORMATION ON THE PATIO SPACE AT THE
 LOBBY LEVEL. WHAT WILL THIS SPACE BE UTILIZED FOR?
  
 A - THE PATIO SPACE IS A LOUNGE/SEATING AREA FOR THE
 USE OF HOTEL GUESTS ACCESSIBLE FROM LOBBY.
  
 Z 02.02.23 - AS THIS SPACE IS PRIVATE AND FOR THE USE
 OF GUESTS, THIS OPEN SPACE CAN'T COUNT AS PUBLIC SPACE
 OR ACTIVE USE. PLEASE REVIEW REGULATIONS OF ACTIVE USE
 AND ACTIVE USE LINER DEPTH TO MAKE SURE YOU ARE MEETING
 THE REQUIREMENTS. SEE ALSO DIAGRAMS REQUESTED, COMMENT
 #2.
  
  
 COMMENT 6
 Z - PROVIDE MORE INFORMATION ON THE PROPOSED
 LIVING/SHOP AREA, AS ILLUSTRATED IN THE LOBBY FLOOR
 PLAN. IT IS UNCLEAR WHAT THIS SPACE IS.
  
 A - THE 'LIVING' SPACE AS PREVIOUSLY LABELED IS THE
 LOBBY SPACE; ALL PLANS HAVE BEEN CORRECTED TO REFERENCE
 THIS.
  
 Z 02.02.23 - SEE DIAGRAMS REQUESTED, COMMENT #2.
  
  
 COMMENT 7
 Z - RETAIL AREA CALCULATIONS DO NOT ADD UP. PLEASE
 ADDRESS FOR CONSISTENCY.
 A - CALCULATIONS HAVE BEEN UPDATED.
  
 Z 02.02.23 - NOT SATISFIED. PLEASE CLARIFY IF ONLY THE
 SALON WILL BE RETAIL AND SPACE ACCESSIBLE TO THE
 GENERAL PUBLIC. CLARIFY IF THE SALON IS NOT CONNECTED
 TO THE SPA AND WILL NOT FUNCTION AS ONE BUSINESS. IN
 ADDITION, CLARIFY IF THE 'OFFICE' ON THE GROUND FLOOR
 IS PART OF THE HOTEL OR THE SALON OR THE SPA. LASTLY,
 PLEASE REVISE CALCULATIONS, ON SHEET A1 RETAIL SPACE
 SQ.FT. SHOWS AS 637, ON SHEET Z1 SHOWS AS 780SQ.FT. AND
 ON SHEETS T1 AND B12 IT SHOWS 788SQ.FT. MAKE SURE ALL
 DATA IS CONSISTENT ACROSS ALL SHEETS.
  
  
 COMMENT 8
 Z - WHAT IS THE HEIGHT OF THE WALL/PATIO LOCATED ALONG
 EVERNIA STREET? IT IS RECOMMENDED THAT THE ELEVATION OF
 THE PATIO IS LOWERED TO MEET THE ACTIVE USE REQUIREMENT
 ALONG EVERNIA STREET.
  
 A - THE PATIO WALL HEIGHT IS 42 INCHES AND INCLUDED ON
 THE REVISED SITE PLAN AT SHEET A1, PARKING LEVEL/SALON
 & LOBBY FLOOR PLAN AT SHEET B1, AND THE SOUTH ELEVATION
 AT SHEET B7. THE PATIO IS FRONTING THE ACTIVE USE ALONG
 EVERNIA STREET, AND IS LEVEL WITH THE HOTEL LOBBY, BUT
 ALSO ACCESSIBLE FROM THE RIGHT-OF-WAY ON THE WEST END.
  
 Z 02.02.23 - NOT SATISFIED. AS DEFINED ON SEC. 94-109,
 THE INTEND TO HAVE 'ACTIVE USE' ON THE GROUND FLOOR IS
 TO ATTRACT PEDESTRIAN ACTIVITY AND PROVIDE DIRECT
 ACCESS TO THE GENERAL PUBLIC FROM THE SIDEWALK, THE
 WALL HEIGHT IS CREATING A VISUAL AND PHYSICAL BARRIER
 FOR PEDESTRIANS TO SEE ANY ACTIVITY IN THE BUILDING AND
 LOT FRONTAGE AND IMPEDING DIRECT ACCESS TO THE
 BUILDING. PLEASE PROVIDE AN ALTERNATIVE DESIGN IN ORDER
 TO MEET THE ACTIVE USE REQUIREMENT AND DECREASE AS MUCH
 AS POSSIBLE ANY NEGATIVE VISUAL AND PHYSICAL BARRIERS
 FOR THE GENERAL PUBLIC. SEE ALSO DIAGRAMS REQUESTED,
 COMMENT #2.
  
  
  
  
  
 STREETSCAPE COMMENTS
  
 COMMENT 1
 Z - THE PROJECT DOES NOT ADDRESS THE STREETSCAPE
 REQUIREMENTS OF SEC. 94-113 OF THE ZLDRS. THE PROJECT
 MUST DEMONSTRATE COMPLIANCE WITH THE MINIMUM
 REQUIREMENTS FOR STREETSCAPE, INCLUDING, BUT NOT
 LIMITED TO STREET TREES, LIGHTING, BICYCLE PARKING,
 ETC.
  
 A - STREETSCAPE TREES HAVE BEEN INCLUDED AND CALLED OUT
 ON LANDSCAPE PLANS FOR PROPOSED SIDEWALKS. REFER TO
 SHEET LP.1. STRUCTURAL SOIL LOCATIONS HAVE BEEN
 DISPLAYED IN LANDSCAPE PLANS AND DETAIL HAS BEEN ADDED
 TO LANDSCAPE DETAILS SHEET ON SHEET LP.2.
  
 Z 02.02.23 - PARTIALLY SATISFIED. PLEASE MAKE SURE TO
 DIFFERENTIATE WHAT IS STRIPPING VERSUS WHAT ARE CURBED
 AND RAISED AREAS. ON SHEET LP-1, ON-STREET PARKING SHOW
 SOME LINES THAT SEEMS TO BE A MISTAKE, PLEASE CLEAN UP.
 IN ADDITION, PLEASE EXPLAIN WHY ON-STREET PARKING
 SPACES WERE REMOVED TO ACCOMMODATE ISLANDS OR RAISED
 CURBED AREAS.
  
 PLEASE ADD EXISTING PARKING METERS AND EXISTING AND
 PROPOSED STREET LIGHTS TO SHEET LP1 TO MAKE SURE THEY
 DO NOT CONFLICT WITH STREET TREES OR OTHER PERMANENT
 FIXTURES. AS PER SEC. 94-113 (B) BUILDINGS SHALL
 PROVIDE EXTERIOR LIGHTING AT A MINIMUM OF 0.6
 FOOTCANDLES. PLEASE PROVIDE A PHOTOMETRIC PLAN AND A
 SPECIFICATION SHEET IN YOUR RESUBMITTAL. NOTE, CITY
 STANDARD FOR DECORATIVE STREETLAMPS IS LUMEC (S55-007).
  
 PER SEC. 94-113, GROUND FLOOR PARKING SHOULD BE
 VISUALLY SCREENED WITH A 5FT LANDSCAPE BUFFER, PLEASE
 MAKE SURE YOU ARE PROVIDING THE BUFFER ON THE EVERNIA
 ST BUILDING FRONTAGE. THE LANDSCAPE BUFFER SHALL BE
 COMPRISED OF A HEDGE PLANTED AT TWO-FOOT TO THREE-FOOT
 INTERVALS AND MAINTAINED AT A MAXIMUM HEIGHT OF 36
 INCHES AT MATURITY.
  
 PER SEC. 94-113 (D)(9), BICYCLE PARKING SHALL BE
 PROVIDED AT A MINIMUM OF 1 SPACE PER EVERY 100 FEET OF
 STREET FRONTAGE. NOTE SHEET LP-1 AND A1 SHOW DIFFERENT
 LOCATIONS OF BIKE RACKS ON THE SOUTH WEST CORNER INSIDE
 THE PROPERTY, BIKE RACKS SHOULD ACCESSIBLE AND VISIBLE
 TO THE GENERAL PUBLIC. PLEASE CONTACT CLAUDIA IBAVEN
 VIA EMAIL TO PROVIDE YOU WITH THE CITY'S BICYCLE
 PARKING GUIDELINES. ONCE YOU REVIEWED THE GUIDELINES,
 MAKE SURE THAT YOU PROVIDE DETAILS ON THE ARRANGEMENT
 OF BIKE RACKS WITH DIMENSIONS, EQUIPMENT SPECS AS NOTED
 IN THE GUIDELINES.
  
  
 COMMENT 2
 Z - SHOW DIMENSIONS TO DEMONSTRATE THE MINIMUM
 DIMENSIONAL REQUIREMENTS WITH THE STREETSCAPE STANDARDS
 OF THE ZLDRS.
  
 A - DIMENSIONS HAVE BEEN ADDED TO LP.1 TO SHOW THAT THE
 TREES MEET MINIMUM SPACING REQUIREMENTS ON SHEET LP.1.
  
 Z 02.02.23 - NOT SATISFIED. PLEASE NOTE, STREET TREES
 LOCATED ADJACENT TO THE DRIVEWAY ARE TOO CLOSE TO
 MOVING TRAFFIC ENTERING AND EXITING THE PROPERTY. AS
 MENTIONED BEFORE, WE RECOMMEND MAKING THE DRIVEWAY ONE
 LINE TO REDUCE IMPACT ON PEDESTRIANS. ALSO NOTE, A STOP
 SIGN IS LOCATED WEST OF THE TREE, IT SHOULD BE ADJACENT
 TO THE DRIVEWAY, WHICH IS ANOTHER REASON WHY IS BEST TO
 REDUCE DRIVEWAY WIDTH TO ACCOMMODATE TREES AND SIGN AND
 SPACING THEM WITHOUT EXCEEDING THE 30FT REQUIREMENT.
 THIS COMMENT RELATES TO SHEET LP-1, IF ANY CHANGES ARE
 MADE, PLEASE MAKE SURE OTHER SHEETS ARE CONSISTENT WITH
 CHANGES.
  
 ON SHEET LP-1 AND A1, PLEASE ADD DIMENSIONS ON SIDEWALK
 TO SHOW HOW IT MEETS THE 8FT REQUIREMENT, AS WELL AS
 DIMENSIONS SHOWING THE MINIMUM OF 4FT FOR TREE GRATES
 AND BASE PLANTING FOR TREES. STAFF RECOMMENDS LIVE OAK
 TREES TO MATCH THE SURROUNDING STREETSCAPE.
  
  
 COMMENT 3
 Z - THE APPLICANT SHOULD REFER TO/CONSIDER THE
 STREETSCAPE IMPROVEMENTS OF THE ADJACENT DEVELOPMENT(S)
 FOR CONTINUITY WHERE POSSIBLE.SHOW THE PROPOSED
 DRIVEWAY/CURB CUT ALONG EVERNIA STREET MAINTAINS THE
 SIDEWALK ELEVATION. [ZLDR S.94-113]
  
 A - THE LANDSCAPE HAS BEEN DESIGNED TO COORDINATE WITH
 THE ADJACENT PROPERTY, REFER TO SHEET LP.1.
  
 Z 02.02.23 - PLEASE SEE COMMENT #2, AND STREET TREES
 RECOMMENDATION IS LIVE OAKS TO ALSO MATCH ADJACENT
 PROPERTY.
  
  
 COMMENT 4 - NEW COMMENT
 Z 02.02.23 - THE RADIUS OF THE CURB-CUT OR APRON ON THE
 DRIVEWAYS ENCROACHES INTO THE ALLEY, PLEASE ADJUST TO
 BE WITHING PROPERTY LINE.
  
  
  
  
  
 PARKING COMMENTS
  
 COMMENT 1
 Z - A PARKING ASSESSMENT AND/OR A PARKING OPERATIONS
 SUMMARY FOR THE PROJECT SHALL BE PROVIDED. THERE NEEDS
 TO BE A CLEAR UNDERSTANDING OF HOW TRAFFIC CIRCULATION
 AND PARKING WILL OPERATE FOR THE PROJECT, AS THERE ARE
 CONCERNS WITH THE NUMBER OF TWO-WAY ACCESS POINTS INTO
 THE PROJECT FROM THE NARROW 14 FT. WIDE ALLEY AT THE
 REAR OF THE SITE.
  
 A - PLEASE SEE THE REVISED TRAFFIC IMPACT STATEMENT.
  
 Z 02.02.23 - NOT SATISFIED. PLEASE PROVIDE A PARKING
 MANAGEMENT PLAN AND A VALET OPERATIONS PLAN THAT LAYS
 OUT OBJECTIVES, POLICIES, AND SAFETY MEASURES TO
 OPTIMIZE CAR PARKING AND LOADING OPERATIONS. PLEASE
 NOTE YOU WILL NEED TO INCLUDE IN YOUR JUSTIFICATION
 LETTER YOUR PLANS.
  
  
 COMMENT 2
 Z - CONSIDERATION SHOULD BE MADE TO PROVIDE ONE-WAY
 TRAFFIC FLOW IN AND OUT OF THE PROJECT FROM THE ALLEY
 TO ACCOMMODATE BETTER TRAFFIC CIRCULATION, AND ALSO
 NARROW THE INGRESS/EGRESS POINTS AT THE ALLEY.
  
 A - BASED ON INPUT FROM THE CITY PUBLIC WORKS, A
 ONE-WAY EASTBOUND DIRECTION FOR THE ALLEY WORKS FOR
 SANITATION CIRCULATION. THIS APPLICANT DOES NOT OBJECT
 TO THE CITY CONVERTING THE ALLEY TO ONE-WAY AND WILL
 INCLUDE 'RIGHT OUT ONLY' DIRECTIONAL SIGNAGE FOR ANYONE
 EXITING TO THE ALLEY.
  
 Z 02.02.23 - PLEASE MAKE SURE NO STRUCTURES SUCH AS
 STAIRS AND RAMPS ARE WITHIN THE REAR MINIMUM SETBACK
 AND THE FRONT MINIMUM SETBACK.
  
  
 COMMENT 3
 Z - COMMERCIAL USES THAT ARE NOT LISTED AS A RESTAURANT
 AND/OR MEETING AREAS, SHALL UTILIZE THE PARKING
 REQUIREMENTS FOR RETAIL, RESTAURANT OR COMMERCIAL USES
 WHICH HAS A MINIMUM REQUIREMENT OF 2 PARKING SPACES PER
 1,000 SQ. FT. AND A MAXIMUM REQUIREMENT OF 4 PARKING
 SPACES PER 1,000 SQ. FT. [ZLDR S.94-111, TABLE IV-9]
  
 A - THE HOTEL RESTAURANT AND BAR AND HOTEL SPA AND
 SALON ARE AMENITIES FOR HOTEL GUESTS. PARKING FOR THESE
 AREAS WAS CALCULATED BASED ON TABLE IV-9 IN ACCORDANCE
 WITH SECTION 94-111(B)(1), ZLDRS.
  
 Z 02.02.23 - NOT SATISFIED. PLEASE SEE SITE PLAN
 COMMENTS, COMMENT #7, CLARIFICATIONS MIGHT LEAD TO
 REVIEW PARKING REQUIREMENTS. ALSO REVISE RETAIL SQ.FT.
 CALCULATIONS AS THEY SHOW DIFFERENT IN DIFFERENT
 SHEETS.
  
  
 COMMENT 4
 Z - ARE THERE ANY SECURITY MEASURES PROPOSED FOR ACCESS
 INTO THE PARKING AREAS FOR THE PROJECT (I.E. GATES,
 ETC.)?
  
 A - CCTV TO BE PROVIDED THROUGHOUT THE PARKING AREAS.
 NO GATES ARE PROPOSED.
  
 Z 02.02.23 - NOT SATISFIED. PLEASE PROVIDE A PARKING
 MANAGEMENT PLAN AND A VALET OPERATIONS PLAN THAT LAYS
 OUT OBJECTIVES, POLICIES, AND SAFETY MEASURES TO
 OPTIMIZE CAR PARKING AND LOADING OPERATIONS. PLEASE
 NOTE YOU WILL NEED TO INCLUDE IN YOUR JUSTIFICATION
 LETTER YOUR PLANS.
  
  
 COMMENT 5
 Z - PROVIDE DIMENSIONS SHOWING GENERAL WIDTH OF PARKING
 STALLS, DRIVE AISLES AND TURNAROUND SPACES WITHIN THE
 PARKING LEVEL PLAN TO DEMONSTRATE CONSISTENCY WITH THE
 ZLDRS.
  
 A - PLEASE SEE SHEET B-1.
  
 Z 02.02.23 NOT SATISFIED. PLEASE NOTE, ON SHEETS T1 AND
 B1, PARKING SPACES ON GROUND LEVEL ARE 16FT IN LENGTH
 INSTEAD OF 18FT, PLEASE REVIEW ALL PARKING SPACES, ITS
 DIMENSIONS, AND REVISE ACCORDINGLY. IN ADDITION, AS PER
 SEC. 94-111 (C)(1), IF A STALL IS ADJACENT TO A WALL OR
 OTHER PHYSICAL OBSTRUCTION THE STALL WIDTHS SHALL BE
 INCREASED BY A MINIMUM OF 1FT, PLEASE REVISE. ALSO SEE
 ZONING AND TABULAR COMMENTS, COMMENT #2.
  
  
 COMMENT 6
 Z - THE PARKING LEVEL PLAN IDENTIFIES 6 PARKING STALLS
 NOTATED WITH A "C". PLEASE CLARIFY THE MEANING OF THESE
 SPACES. IF THESE SPACES ARE COMPACT PARKING SPACES, A
 STALL PAINTING DETAIL FOR COMPACT PARKING SPACES SHALL
 ALSO BE PROVIDED.
  
 A - THE 'C' WAS MEANT TO IDENTIFY COMPACT PARKING
 SPACES. SHEET B-1 IDENTIFIES ???COMPACT??? PAINTING
 DETAILS.
  
 Z 02.02.23 - SATISFIED.
  
  
 COMMENT 7
 Z - TWO 10 FT. X 50 FT. LOADING ZONES ARE REQUIRED FOR
 THE PROJECT. LOADING FOR THE PROPOSED DEVELOPMENT SHALL
 OCCUR INTERNAL TO THE BUILDING FOOTPRINT. ALSO INCLUDE
 AN AUTO-TURN DIAGRAM FOR LOADING TO DETERMINE THE
 FEASIBILITY OF LOADING CIRCULATION. [ZLDR S. 94-111 AND
 S.94-485(P)]
  
 A - ONE 10' X 50' LOADING ZONE IS PROVIDED ON NORTH
 SIDE ALONG ALLEYWAY; A VARIANCE REQUEST IS INCLUDED
 WITH THIS SUBMITTAL SEEKING THIS APPROVAL. PLEASE SEE
 THE AUTOTURN ANALYSIS PLAN SHEETS.
  
 Z 02.02.23 - PLEASE ADD A NOTE TO A1, PARKING TABLE
 ABOUT THE VARIANCE REQUESTED.
  
  
 COMMENT 8
 Z - THE PROJECT SHALL PROVIDE: A) SECURE BIKE RACKS
 AND/OR STORAGE AT A RATIO OF ONE BICYCLE PARKING SPACE
 PER EVERY 15 PARKING SPACES PROVIDED, B) A MINIMUM OF
 ONE SHOWER AND CHANGING FACILITY SHALL BE PROVIDED TO
 BE AVAILABLE TO ALL TENANTS AND SHALL BE LOCATED WITHIN
 THE BUILDING, OR WITHIN 200 FT. OF THE BUILDING
 ENTRANCE, FOR DEVELOPMENTS GREATER THAN 50,000 SQ. FT.
 IN GROSS BUILDING AREA. [ZLDR S.94-111(I)]
  
 A - THE BIKE RACK INFORMATION IS SHOWN ON SHEET B-1.
  
 Z 02.02.23 - NOT SATISFIED. PLEASE CLARIFY WHERE THE
 SHOWER AND CHANGING FACILITY IS IN THE BUILDING. ALL 4
 BICYCLE PARKING SPACES CAN BE IN A BIKE STORAGE ROOM.
 IN ADDITION, PLEASE CONTACT CLAUDIA IBAVEN VIA EMAIL TO
 PROVIDE YOU WITH THE CITY???S BICYCLE PARKING
 GUIDELINES. ONCE YOU REVIEWED THE GUIDELINES, MAKE SURE
 THAT YOU PROVIDE DETAILS ON THE ARRANGEMENT OF BIKE
 RACKS WITH DIMENSIONS, AND TYPE OF RACK OR PARKING
 EQUIPMENT AS NOTED IN THE GUIDELINES.
  
  
 COMMENT 9
 Z - A DETAIL OF THE BICYCLE RACK AND/OR STORAGE SPACE
 SHALL BE PROVIDED. THE DETAIL SHALL BE CONSISTENT WITH
 THE PLANS.
  
 A - THE BIKE RACK INFORMATION IS SHOWN ON SHEET B-1.
  
 Z 02.02.23 - NOT SATISFIED. TO CLARIFY, BICYCLE PARKING
 ON THE STREETSCAPE IS REQUIRED AS PER SEC. 94-113
 (D)(9) AND WILL SERVE THE GENERAL PUBLIC. IN ADDITION,
 BICYCLE PARKING/STORAGE IS REQUIRED PER SEC. 94-111
 (I)(1) FOR BUILDING OCCUPANTS.
  
  
 COMMENT 10
 Z - ALL PARKING STRUCTURE ENTRANCES FACING A STREET
 FRONTAGE SHALL BE REQUIRED TO TREAT THE INTERIOR
 PORTION OF THE GARAGE ENTRY TO A DEPTH OF AT LEAST 20
 FT. FROM THE BUILDING FACADE. TREATMENT MAY INCLUDE,
 BUT SHALL NOT BE LIMITED TO, STUCCO OR PLASTER,
 FINISHED AND PAINTED COMPARABLE TO HABITABLE SPACE.
 SHOW IN PLANS TO DEMONSTRATE COMPLIANCE.
 [ZLDRS.94-111(Q)]
  
 A - ACKNOWLEDGED. PLANS SUBMITTED FOR CONSTRUCTION
 PERMIT WILL INCLUDE THE DETAILS FOR THE INTERIOR WALLS
 AT THE GARAGE ENTRY/EXIT, WHICH WILL BE FINISHED, AT
 LEAST 20 FEET IN LENGTH FROM THE BUILDING FA??ADE, AND
 WILL COMPLY WITH ALL CITY CODE REQUIREMENTS.
  
 Z 02.02.23 - PLEASE SEE STREETSCAPE COMMENTS, COMMENT
 #1 AND REVISE PLANS TO BEST SCREEN SURFACE PARKING LOT
 FROM STREET VIEW.
  
  
 COMMENT 11
 Z - MAXIMUM SLOPE FOR PARKING RAMPS SHALL BE IN
 ACCORDANCE WITH ADA REQUIREMENTS AND SHALL NOT EXCEED
 6%. PLEASE SHOW PROPOSED SLOPE FOR THE RAMP TO
 DEMONSTRATE COMPLIANCE. [ZLDR S.94-111(Q)]
  
 A - THE SLOPE IS IDENTIFIED ON SHEET B-1 AND CIVIL
 PLANS.
  
 Z 02.02.23 NOTE, RAMPS ARE LOCATED WITHIN THE MINIMUM
 SETBACKS AREA, PLEASE REVISE AS NOT STRUCTURES CAN BE
 WITHIN THE MINIMUM SETBACKS.
  
  
  
  
  
 ARCHITECTURAL COMMENTS
  
 COMMENT 1
 Z - ARCHITECTURAL ELEVATIONS ARE INCONSISTENT WITH THE
 RENDERINGS AND PLANS (I.E. EAST ELEVATION RETAINING
 WALL, ETC.). ALL RELEVANT DIMENSIONS AND INFORMATION
 SHALL BE PROVIDED IN THE ELEVATION DRAWINGS. THE
 INFORMATION SHALL BE CONSISTENT WITH THE STANDARDS FOR
 HEIGHT, STORY, VERTICAL PROJECTION, HORIZONTAL
 PROJECTION, ETC. AS DEFINED IN THE ZLDRS.
 [ZLDRS.94-109]
  
 A - PLANS AND ELEVATIONS HAVE BEEN REVISED TO BE
 CONSISTENT.
  
 Z 02.02.23 - PARTIALLY SATISFIED. PLEASE ADD SETBACK
 LINES TO ELEVATIONS.
  
  
 COMMENT 2
 Z - DIMENSION TO THE HIGHEST POINT OF THE PROPOSED
 BUILDING IS MISSING. PLEASE PROVIDE TO DEMONSTRATION
 CONSISTENCY WITH THE ZLDRS.
  
 A - THIS HAS BEEN ADDED ON THE ELEVATION SHEETS
 (SHEETA2, A3, B7, B8, B9, B10, B14, B15, B16, AND B17.
  
 Z 02.02.23 - PARTIALLY SATISFIED. SHEET A2 AND A3, DO
 NOT SHOW DIMENSIONS. PLEASE ADD DIMENSIONS TO ALL
 ELEVATIONS TO SHOW HEIGHT REQUIREMENT, WHICH IS
 CALCULATED FROM THE AVERAGE ELEVATION OF THE ADJACENT
 PUBLIC SIDEWALK OR THE CROWN OF THE ROAD IF NO SIDEWALK
 EXISTS TO THE TOP OF THE HIGHEST STORY AS PER SEC.
 94-109. AS THE LOT HAS A SLOPE, PLEASE PROVIDE
 DIMENSIONS ON BOTH SIDES OF THE ELEVATIONS. ALSO ADD
 DIMENSIONS TO VERTICAL PROJECTIONS ENCROACHING THE MAX
 HEIGHT, SEE MORE INFO ABOUT VERTICAL PROJECTIONS ON
 SEC. 94-109, TABLE IV-5.
  
  
 COMMENT 3
 Z - PLEASE PROVIDE MORE INFORMATION ON THE FACADE
 ARTICULATION OF THE BUILDING (I.E. MATERIALS, ETC.).
  
 A - INFORMATION HAS BEEN PROVIDED ON BUILDING MATERIAL
 NOTES ON ELEVATIONS.
  
 Z 02.02.23 - PARTIALLY SATISFIED. PLEASE PROVIDE MORE
 DETAILS OF THE ???ALUMINUM PIPE SCREEN??? AND HOW
 DIMENSIONS AND SPACING WILL FULLY SCREEN MECHANICAL
 EQUIPMENT. YOU ARE ENCOURAGED TO PROVIDE PHOTOS OF
 MATERIALS AND ADD TO AN ELEVATION OR RENDERING SHEET TO
 FULLY SHOW FA??ADE TREATMENT.
  
 ON SHEET B7, WALLS WHERE 'PROPOSED PUBLIC ART' IS
 LOCATED, PLEASE EXPLAIN FURTHER. ALSO, PLEASE CLARIFY
 THE MATERIAL OF THE WALL AS IT IS NOT LABELED. ON
 RENDERINGS THERE SEEMS TO BE A VEGETATED WALL, PLEASE
 CONFIRM IF THIS WILL BE THE FA??ADE TREATMENT AND ADD
 TO ELEVATION SHEETS.
  
  
 COMMENT 4
 Z - WHAT IS THE SIZE OF THE HOTEL ROOMS? THE PLANS MUST
 CLEARLY DEMONSTRATE THAT ALL ROOMS WITHIN THE PROPOSED
 HOTEL AREA ARE A MINIMUM OF 325 SQ. FT. [ZLDR S.94-109,
 HOTEL]
  
 A - THE PLANS HAVE BEEN UPDATED. THE MINIMUM GUEST ROOM
 AREA IS 350 SF.
  
 Z 02.02.23 - SATISFIED. PLEASE PROVIDE AVERAGE UNIT
 SIZE.
  
  
 COMMENT 5
 Z - COVERED STRUCTURES ON THE ROOF TOP (I.E. STORAGE
 AREAS, RESTROOMS, ETC.) SHALL NOT EXCEED 30% OF THE
 GROSS ROOFTOP AREA. PLEASE SHOW CALCULATIONS TO
 DEMONSTRATE COMPLIANCE. [ZLDR S.94-109]
  
 A - THE CALCULATIONS SHOWING COMPLIANCE CAN BE FOUND ON
 SHEET B-6.
  
 Z 02.02.23 - SEE DIAGRAMS REQUESTED, COMMENT #1. MAKE
 SURE YOU ARE DEFINING THE TYPE OF OPEN SPACE AS PER
 SEC. 94-109, TABLE IV-6 AND MEETS REQUIREMENTS ON TABLE
 IV-7.
  
  
 COMMENT 6
 Z - PROVIDE DIMENSIONS TO ALL HORIZONTAL PROJECTIONS
 (I.E. BALCONIES).
  
 A - FLOOR PLANS HAVE BEEN REVISED TO INCLUDE ALL
 DIMENSIONS AS REQUESTED.
  
 Z 02.02.23 - SATISFIED. PLEASE CLARIFY THAT ALL
 PROJECTIONS ARE NOT EXCEEDED MAXIMUM HORIZONTAL
 ENCROACHMENT.
  
  
 COMMENT 7
 Z - THERE APPEARS TO BE BLANK WALLS ON THE FACADE OF
 THE PROPOSED BUILDINGS. PLEASE ADDRESS TO ENSURE
 CONSISTENCY WITH THE ZLDRS.
  
 A - THIS HAS BEEN CLARIFIED. PLEASE SEE REVISED
 BUILDING ELEVATIONS.
  
 Z 02.02.23 - PARTIALLY SATISFIED. ON SHEETS B14-17,
 PLEASE REVISE AS THERE ARE SOME PLANES AREAS THAT
 SHOULD BE THE SAME PLANE. FOR EXAMPLE, ON SHEET B14,
 PLANE E AND G SHOULD BE THE SAME PLANE, AS WELL AS F,
 H, M AND N, ALSO PLANES B AND J, AND PLANES L AND K.
 PLEASE REVISE SHEETS AND CALCULATIONS.
  
  
  
 SIGNAGE COMMENTS
  
 COMMENT 1
 Z - PLEASE PROVIDE DETAILS FOR ANY PROPOSED SIGNAGE FOR
 THE PROJECT OR INCLUDE A NOTE THAT STATES THAT ALL
 SIGNAGE PROPOSED FOR THE PROJECT SHALL COMPLY WITH THE
 SIGNAGE REQUIREMENTS OF THE CITY???S ZONING AND LAND
 DEVELOPMENT REGULATIONS (ZLDRS).
  
 A - A NOTE HAS BEEN PROVIDED ON THE PARKING LEVEL/SALON
 & LOBBY FLOOR PLAN (SHEET B1) THAT ALL SIGNAGE PROPOSED
 FOR THE PROJECT WILL COMPLY WITH THE CITY???S ZLDRS.
  
 Z 02.02.23 - NOT SATISFIED. ON THE MAIN FACADE YOU HAVE
 THE 'VIANA' SIGN, WHICH IS CONSIDERED A BUILDING
 IDENTIFY SIGN, YOU WILL NEED TO PROVIDE HOW THIS SIGN
 MEETS SIGN REGULATIONS ON SEC. 94-110. IN ADDITION,
 PLEASE CLARIFY IF THE SIGN 'HOTEL EVERNIA' ON THE
 EXISTING BUILDING WILL BE REMOVED OR REMAIN.
  
  
  
 Z 02.02.23 - OTHER COMMENTS
 PLEASE NOTE, AS PER SEC. 94-54 (A)(1), THE APPLICANT
 SHALL ADDRESS ANY COMMENTS OF THE PPRC AND SUBMIT A
 REVISED APPLICATION WITHIN 60 DAYS OF THE DATE OF SUCH
 COMMENTS. FAILURE TO MAKE THE REQUIRED SUBMITTALS
 WITHIN THE 60-DAY DEADLINE WILL DEEM THE APPLICATION AS
 WITHDRAWN. AT LEAST 15 DAYS PRIOR TO THE EXPIRATION OF
 THE 60-DAY REVISION PERIOD, THE APPLICANT MAY REQUEST A
 30-DAY EXTENSION. NO FURTHER EXTENSION REQUEST IS
 PERMITTED.
  
 WHEN RESUBMITTING, WRITTEN RESPONSES TO COMMENTS NEED
 TO BE PROVIDED AS WELL AS A MINIMUM OF TWO (2) PAPER
 COPIES AND AN ELECTRONIC COPY IN .PNG/.PDF FORMAT OF
 ALL PLANS AND ALL DOCUMENTATION REQUIRED IN THE
 APPLICATION. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS
 TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL
 COMMENTS.
  
 LASTLY, YOU WERE PERMITTED ONE (1) RESUBMITTAL AT NO
 ADDITIONAL COST. AS PREVIOUSLY ISSUED COMMENTS CONTINUE
 TO NOT BE SUFFICIENTLY ADDRESSED, THE APPLICANT WILL BE
 ASSESSED A RESUBMITTAL FEE. SUCH FEE WILL BE 20% OF THE
 ORIGINAL APPLICATION FEE, WHICH IS $300.
  
 --END OF COMMENTS--
  

Review Stop Z ZONING
Rev No 1 Status F Date 10-07-2022 Cont ID  
Sent By llouie Date 10-07-2022 Time   Rev Time  
Received By llouie Date 10-07-2022 Time   Sent To  
Notes
2022-10-07 11:19:44GENERAL COMMENTS:
  
 1.) THE PROJECT CANNOT EXCEED 79,800 SQ. FT. (MAXIMUM
 FAR OF 4). THERE ARE ERRORS AND DISCREPANCIES IN THE
 FAR CALCULATIONS THAT COULD EXCEED THE ALLOWABLE FAR.
  
 2.) THE COUNTY TPS LETTER PROVIDED FOR THE PROJECT DOES
 NOT ACCURATELY REFLECT THE COMMERCIAL/RETAIL SQUARE
 FOOTAGE FOR THE PROJECT AS PROVIDED IN THE PLANS. THE
 TPS LETTER SHALL BE REVISED TO ACCURATELY REFLECT THE
 CORRECT COMMERCIAL RETAIL SQUARE FOOTAGE TO AVOID
 COUNTING ANY GHOST TRIPS.
  
 3.) PROVIDE WRITTEN CONFIRMATION THAT THE PUBLIC
 UTILITIES DEPARTMENT HAS REVIEWED THE PROPOSAL FOR
 WATER, SEWAGE TREATMENT, STORM DRAINAGE AND GARBAGE
 COLLECTION SERVICES. PLEASE CONTACT THE CITY OF WEST
 PALM BEACH ENGINEERING SERVICES DEPARTMENT (561)
 494-1040.
  
 4.) PROVIDE LETTERS FROM ALL PUBLIC UTILITIES
 CONFIRMING THAT THE PROPOSED PROJECT DOES NOT ENCROACH
 INTO THEIR EASEMENTS OR OTHERWISE INTERFERE WITH THE
 PROVISIONS OF THEIR SERVICES: AT&T, FPU, FPL AND
 COMCAST.
  
 5) WHAT ARE THE PROVISIONS FOR THE EXISTING UTILITIES
 (I.E. UTILITY POLES, ETC.)? ARE ANY IMPROVEMENTS
 PROPOSED WITHIN THE ALLEY? PLEASE PROVIDE MORE
 INFORMATION.
  
 6.) MORE INFORMATION IS REQUIRED ON THE COMMERCIAL
 COMPONENT OF THE PROJECT. IS THE COMMERCIAL SPACE FOR
 HOTEL GUESTS ONLY OR IS IT OPEN TO THE GENERAL PUBLIC?
 PARKING CALCULATIONS ARE REQUIRED FOR ANY
 COMMERCIAL/RETAIL SPACE.
  
 7.) PROVIDE A LETTER ENSURING FAA COMPLIANCE (A
 DETERMINATION OF NO HAZARD) IN REGARD TO THE HEIGHT OF
 ANY TOWERS OR STRUCTURES WITHIN THE DESIGNATED FLIGHT
 PATH.
  
  
 JUSTIFICATION STATEMENT:
  
 1.) THE PROJECT WILL BE UTILIZING TDRS. PLEASE REVISE
 THE JUSTIFICATION STATEMENT TO INCLUDE ANY PERTINENT
 INFORMATION/HISTORY ON THE TDRS ACQUIRED FOR THE
 PROJECT. IT IS IMPORTANT TO PROVIDE ALL BACKGROUND
 INFORMATION ON THE PROPOSED PROJECT.
  
 2.) PROVIDE BACKGROUND INFORMATION ON THE PRESERVATION
 OF THE EXISTING HOTEL EVERNIA AND ANY DISCUSSIONS HAD
 WITH THE CITY'S HISTORIC PRESERVATION PLANNER(S).
  
 3.) HAS THERE BEEN ANY PUBLIC OUTREACH REGARDING THE
 PROPOSED PROJECT?
  
  
 DIAGRAMS REQUESTED:
  
 1.) SEPARATE DIAGRAM SHEETS SHALL BE REQUIRED TO
 DEMONSTRATE COMPLIANCE WITH THE FOLLOWING (SIMILAR TO
 THE FAR DIAGRAMS) ??? REQUIRED AND PROPOSED INFORMATION
 REQUESTED ON THE SHEET(S) FOR: A) BUILDING SETBACKS; B)
 BUILDING FOOTPRINT (FOR LOT AREA <50,000 SQ. FT.); C)
 OPEN SPACE (PRIVATE ONLY; PUBLIC NOT REQUIRED); D)
 ACTIVE USE REQUIREMENT E.) TRANSPARENCY REQUIREMENT; F)
 ACTIVE USE LINER DEPTH REQUIREMENT; G) FACADE
 ARTICULATION REQUIREMENTS (I.E. FENESTRATION,
 HORIZONTAL PROJECTIONS, ARCHITECTURAL FEATURES, BLANK
 WALL, ETC.).
  
 2.) ALSO NOTE THAT ACTIVE USES ARE REGULATED AS A
 PERCENTAGE OF THE BUILDABLE LOT FRONTAGE (NOT THE
 ACTUAL BUILDING FRONTAGE AS PROVIDED IN THE PLANS).
 PLEASE REFER TO REQUIREMENTS AND DIAGRAMS IN ARTICLE
 IV.
  
  
 ZONING TABULAR COMMENTS (SHEET A1):
  
 1.) THE ZONING DISTRICT IS QBD 8-12 STORY RECEIVING
 SITE.
  
 2.) CHECK THE PROVIDED PARKING COUNT (IT DOES NOT
 APPEAR TO BE 52 PARKING SPACES AS NOTED).
  
 3.) INFORMATION ON THE REQUIRED MINIMUM AND MAXIMUM
 BUILDING SETBACK INFORMATION SHALL BE PROVIDED. THIS
 INFORMATION IS NECESSARY TO DEMONSTRATE COMPLIANCE AS
 THE BUILDING MUST LOCATED WITHIN THE REQUIRED SETBACK
 RANGE.
  
 4.) INCORRECT INFORMATION IS PROVIDED FOR THE ALLOWABLE
 AND PROPOSED BUILDING FOOTPRINT. INFORMATION PROVIDED
 MUST BE CONSISTENT WITH THE ZLDRS.
  
 5.) THE MINIMUM GROUND TO 12 (152???) REQUIRED
 INFORMATION FOR BUILDING SETBACKS IS INCORRECT IN THE
 TABLE. PLEASE ADDRESS FOR CONSISTENCY.
  
 6.) PARKING CALCULATIONS (REQUIRED AND PROVIDED) SHALL
 BE BROKEN DOWN BY USE. ALSO INCLUDE PARKING
 CALCULATIONS FOR COMPACT PARKING, DISABLED PARKING,
 BICYCLE PARKING, LOADING ZONES, ETC.
  
 7.) CHECK THE PROVIDED PARKING COUNT (IT DOES NOT
 APPEAR TO BE 52 PARKING SPACES AS NOTED).
  
 8.) THE PLANS SHOULD REFERENCE THE TRANSFER OF
 DEVELOPMENT RIGHTS (TDRS) PROGRAM (CERTIFICATE NO.
 22-11) AND HOW MUCH ADDITIONAL BUILDING SQUARE FOOTAGE
 WILL BE ADDED TO THE PROJECT BASED ON THE PURCHASE AND
 UTILIZATION OF TDRS. IT IS IMPORTANT TO UNDERSTAND WHY
 AND HOW THE PROJECT CAN EXCEED THE REQUIREMENTS OF THE
 QBD-8 DISTRICT (BASE ZONING FOR THE PROJECT SITE)
 ILLUSTRATED/NOTED IN THE PLAN.
  
 9.) THE CODE SUMMARY INFORMATION SHALL REFERENCE THE
 CITY OF WEST PALM BEACH (NOT PALM BEACH COUNTY).
  
  
 SITE PLAN COMMENTS:
  
 1.) PER THE ZLDRS, "GROSS BUILDING AREA" MEANS THE
 TOTAL FLOOR AREA OF A BUILDING, INCLUDING
 AIR-CONDITIONED OR FULLY ENCLOSED STORAGE SPACES,
 ENCLOSED AREAS ON THE ROOFTOP, SUCH AS BATHROOMS AND
 LOBBIES, STAIRS AND ELEVATOR AREAS, AND EXTERNAL
 UNENCLOSED CIRCULATION AREAS. THE FAR DIAGRAMS DO NOT
 APPEAR TO BE ACCURATE. PLEASE ENSURE ALL DIAGRAMS AND
 CALCULATIONS DEFINED AS THE GROSS BUILDING AREA ARE
 INCLUDED IN THE FAR CALCULATIONS. MAKE ANY CORRECTIONS
 WHERE NECESSARY. [ZLDR S.94-109]
  
 2.) PER THE ZLDRS, THE MEZZANINE SHALL BE COUNTED
 TOWARD THE MAXIMUM ALLOWABLE FAR. ACCORDING TO THE
 PLAN, THE MEZZANINE HAS BEEN EXCLUDED FROM THE FAR
 CALCULATIONS. [ZLDR S.94-109]
  
 3.) THE BUILDING SETBACK ON EVERNIA STREET (SECONDARY
 STREET) SHALL BE MEASURED FROM THE BACK OF CURB (NOT
 THE PROPERTY LINE AS PROVIDED IN THE PLANS). THE
 MINIMUM BUILDING SETBACK IS 12 FT. AND THE MAXIMUM
 BUILDING SETBACK IS 35 FT. THE BUILDING ALONG EVERNIA
 STREET MUST BE WITHIN THIS SETBACK RANGE. ALSO, PLEASE
 CLEARLY PROVIDE THE ACCURATE DIMENSIONS TO DEMONSTRATE
 COMPLIANCE. [ZLDR S.94-109 AND S.94-132, TABLE IV-46]
  
 4.) CURB CUTS, PARKING ENTRANCES, EXISTING AND
 DRIVEWAYS SHALL NOT BE WIDER THAN 25 FT. AS MEASURED
 PARALLEL TO THE STREET AT THE CURB. NO DIMENSIONS HAVE
 BEEN PROVIDED IN THE PLANS TO DEMONSTRATE COMPLIANCE
 WITH THIS REQUIREMENT. [ZLDR S.94-111]
  
 5.) PROVIDE MORE INFORMATION ON THE PATIO SPACE AT THE
 LOBBY LEVEL. WHAT WILL THIS SPACE BE UTILIZED FOR?
  
 6.) PROVIDE MORE INFORMATION ON THE PROPOSED
 LIVING/SHOP AREA, AS ILLUSTRATED IN THE LOBBY FLOOR
 PLAN. IT IS UNCLEAR WHAT THIS SPACE IS.
  
 7.) RETAIL AREA CALCULATIONS DO NOT ADD UP. PLEASE
 ADDRESS FOR CONSISTENCY.
  
 8.) WHAT IS THE HEIGHT OF THE WALL/PATIO LOCATED ALONG
 EVERNIA STREET? IT IS RECOMMENDED THAT THE ELEVATION OF
 THE PATIO IS LOWERED TO MEET THE ACTIVE USE REQUIREMENT
 ALONG EVERNIA STREET.
  
  
 STREETSCAPE COMMENTS:
  
 1.) THE PROJECT DOES NOT ADDRESS THE STREETSCAPE
 REQUIREMENTS OF SEC. 94-113 OF THE ZLDRS. THE PROJECT
 MUST DEMONSTRATE COMPLIANCE WITH THE MINIMUM
 REQUIREMENTS FOR STREETSCAPE, INCLUDING, BUT NOT
 LIMITED TO STREET TREES, LIGHTING, BICYCLE PARKING,
 ETC.
  
 2.) SHOW DIMENSIONS TO DEMONSTRATE THE MINIMUM
 DIMENSIONAL REQUIREMENTS WITH THE STREETSCAPE STANDARDS
 OF THE ZLDRS.
  
 3.) THE APPLICANT SHOULD REFER TO/CONSIDER THE
 STREETSCAPE IMPROVEMENTS OF THE ADJACENT DEVELOPMENT(S)
 FOR CONTINUITY WHERE POSSIBLE.SHOW THE PROPOSED
 DRIVEWAY/CURB CUT ALONG EVERNIA STREET MAINTAINS THE
 SIDEWALK ELEVATION. [ZLDR S.94-113]
  
  
 PARKING COMMENTS:
  
 1.) A PARKING ASSESSMENT AND/OR A PARKING OPERATIONS
 SUMMARY FOR THE PROJECT SHALL BE PROVIDED. THERE NEEDS
 TO BE A CLEAR UNDERSTANDING OF HOW TRAFFIC CIRCULATION
 AND PARKING WILL OPERATE FOR THE PROJECT, AS THERE ARE
 CONCERNS WITH THE NUMBER OF TWO-WAY ACCESS POINTS INTO
 THE PROJECT FROM THE NARROW 14 FT. WIDE ALLEY AT THE
 REAR OF THE SITE.
  
 2.) CONSIDERATION SHOULD BE MADE TO PROVIDE ONE-WAY
 TRAFFIC FLOW IN AND OUT OF THE PROJECT FROM THE ALLEY
 TO ACCOMMODATE BETTER TRAFFIC CIRCULATION, AND ALSO
 NARROW THE INGRESS/EGRESS POINTS AT THE ALLEY.
  
 3.) COMMERCIAL USES THAT ARE NOT LISTED AS A RESTAURANT
 AND/OR MEETING AREAS, SHALL UTILIZE THE PARKING
 REQUIREMENTS FOR RETAIL, RESTAURANT OR COMMERCIAL USES
 WHICH HAS A MINIMUM REQUIREMENT OF 2 PARKING SPACES PER
 1,000 SQ. FT. AND A MAXIMUM REQUIREMENT OF 4 PARKING
 SPACES PER 1,000 SQ. FT. [ZLDR S.94-111, TABLE IV-9]
  
 4.) ARE THERE ANY SECURITY MEASURES PROPOSED FOR ACCESS
 INTO THE PARKING AREAS FOR THE PROJECT (I.E. GATES,
 ETC.)?
  
 5.) PROVIDE DIMENSIONS SHOWING GENERAL WIDTH OF PARKING
 STALLS, DRIVE AISLES AND TURNAROUND SPACES WITHIN THE
 PARKING LEVEL PLAN TO DEMONSTRATE CONSISTENCY WITH THE
 ZLDRS.
  
 6.) THE PARKING LEVEL PLAN IDENTIFIES 6 PARKING STALLS
 NOTATED WITH A "C". PLEASE CLARIFY THE MEANING OF THESE
 SPACES. IF THESE SPACES ARE COMPACT PARKING SPACES, A
 STALL PAINTING DETAIL FOR COMPACT PARKING SPACES SHALL
 ALSO BE PROVIDED.
  
 7.) TWO 10 FT. X 50 FT. LOADING ZONES ARE REQUIRED FOR
 THE PROJECT. LOADING FOR THE PROPOSED DEVELOPMENT SHALL
 OCCUR INTERNAL TO THE BUILDING FOOTPRINT. ALSO INCLUDE
 AN AUTO-TURN DIAGRAM FOR LOADING TO DETERMINE THE
 FEASIBILITY OF LOADING CIRCULATION. [ZLDR S. 94-111 AND
 S.94-485(P)]
  
 8.) THE PROJECT SHALL PROVIDE: A) SECURE BIKE RACKS
 AND/OR STORAGE AT A RATIO OF ONE BICYCLE PARKING SPACE
 PER EVERY 15 PARKING SPACES PROVIDED, B) A MINIMUM OF
 ONE SHOWER AND CHANGING FACILITY SHALL BE PROVIDED TO
 BE AVAILABLE TO ALL TENANTS AND SHALL BE LOCATED WITHIN
 THE BUILDING, OR WITHIN 200 FT. OF THE BUILDING
 ENTRANCE, FOR DEVELOPMENTS GREATER THAN 50,000 SQ. FT.
 IN GROSS BUILDING AREA. [ZLDR S.94-111(I)]
  
 9.) A DETAIL OF THE BICYCLE RACK AND/OR STORAGE SPACE
 SHALL BE PROVIDED. THE DETAIL SHALL BE CONSISTENT WITH
 THE PLANS.
  
 10.) ALL PARKING STRUCTURE ENTRANCES FACING A STREET
 FRONTAGE SHALL BE REQUIRED TO TREAT THE INTERIOR
 PORTION OF THE GARAGE ENTRY TO A DEPTH OF AT LEAST 20
 FT. FROM THE BUILDING FACADE. TREATMENT MAY INCLUDE,
 BUT SHALL NOT BE LIMITED TO, STUCCO OR PLASTER,
 FINISHED AND PAINTED COMPARABLE TO HABITABLE SPACE.
 SHOW IN PLANS TO DEMONSTRATE COMPLIANCE. [ZLDR
 S.94-111(Q)]
  
 11.) MAXIMUM SLOPE FOR PARKING RAMPS SHALL BE IN
 ACCORDANCE WITH ADA REQUIREMENTS AND SHALL NOT EXCEED
 6%. PLEASE SHOW PROPOSED SLOPE FOR THE RAMP TO
 DEMONSTRATE COMPLIANCE. [ZLDR S.94-111(Q)]
  
  
 ARCHITECTURAL COMMENTS:
  
 1.) ARCHITECTURAL ELEVATIONS ARE INCONSISTENT WITH THE
 RENDERINGS AND PLANS (I.E. EAST ELEVATION RETAINING
 WALL, ETC.). ALL RELEVANT DIMENSIONS AND INFORMATION
 SHALL BE PROVIDED IN THE ELEVATION DRAWINGS. THE
 INFORMATION SHALL BE CONSISTENT WITH THE STANDARDS FOR
 HEIGHT, STORY, VERTICAL PROJECTION, HORIZONTAL
 PROJECTION, ETC. AS DEFINED IN THE ZLDRS. [ZLDR
 S.94-109]
  
 2.) DIMENSION TO THE HIGHEST POINT OF THE PROPOSED
 BUILDING IS MISSING. PLEASE PROVIDE TO DEMONSTRATION
 CONSISTENCY WITH THE ZLDRS.
  
 3.) PLEASE PROVIDE MORE INFORMATION ON THE FACADE
 ARTICULATION OF THE BUILDING (I.E. MATERIALS, ETC.).
  
 4.) WHAT IS THE SIZE OF THE HOTEL ROOMS? THE PLANS MUST
 CLEARLY DEMONSTRATE THAT ALL ROOMS WITHIN THE PROPOSED
 HOTEL AREA ARE A MINIMUM OF 325 SQ. FT. [ZLDR S.94-109,
 HOTEL]
  
 5.) COVERED STRUCTURES ON THE ROOF TOP (I.E. STORAGE
 AREAS, RESTROOMS, ETC.) SHALL NOT EXCEED 30% OF THE
 GROSS ROOFTOP AREA. PLEASE SHOW CALCULATIONS TO
 DEMONSTRATE COMPLIANCE. [ZLDR S.94-109]
  
 6.) PROVIDE DIMENSIONS TO ALL HORIZONTAL PROJECTIONS
 (I.E. BALCONIES).
  
 7.) THERE APPEARS TO BE BLANK WALLS ON THE FACADE OF
 THE PROPOSED BUILDINGS. PLEASE ADDRESS TO ENSURE
 CONSISTENCY WITH THE ZLDRS.
  
  
 SIGANGE COMMENTS:
  
 1.) PLEASE PROVIDE DETAILS FOR ANY PROPOSED SIGNAGE FOR
 THE PROJECT OR INCLUDE A NOTE THAT STATES THAT ALL
 SIGNAGE PROPOSED FOR THE PROJECT SHALL COMPLY WITH THE
 SIGNAGE REQUIREMENTS OF THE CITY???S ZONING AND LAND
 DEVELOPMENT REGULATIONS (ZLDRS).
  
  
 INSTRUCTIONS FOR RESUBMITTAL:
  
 * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 * ALL PLAN SHEETS IN INFORMATION PROVIDED IN
 SUPPLEMENTAL DOCUMENTS SHALL MATCH FOR CONSISTENCY.
 PLEASE ENSURE ALL PLANS SHEETS AND INFORMATION MATCH
 PRIOR TO RESUBMITTING.
  
 * WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF FOUR
 (4) FULL COLORED PAPER COPIES AND A SET IN 11 INCHES X
 17 INCHES, AND AN ELECTRONIC COPY OF ALL PLANS AND
 DOCUMENTS.
  
 * CHANGES ON THE RESUBMITTED PLANS MAY RESULT IN
 ADDITIONAL COMMENTS.
  
 * PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20 PERCENT OF THE ORIGINAL APPLICATION FEE
 ($600).
  
 * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE ANY
 QUESTIONS.
  

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved