| Plan Review Stops For Project Z22060038 |
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
07-06-2022 |
|
|
Cont ID |
|
| Sent By |
samisial |
Date |
07-12-2022 |
Time |
12:17 |
Rev Time |
0.00 |
| Received By |
samisial |
Date |
07-06-2022 |
Time |
14:11 |
Sent To |
|
|
| Notes |
| 2022-07-06 14:12:42 | PLEASE PROVIDE PLANS SHOWING TREES/PALMS PROPOSED FOR | | | REMOVAL AND INCLUDE THE SIZE (DIAMETER OF CANOPY), | | | SPECIES AND LOCATION. CONDITIONS OF EXISTING | | | TREES/PALMS PROPOSED FOR REMOVAL SHOULD BE INCLUDED AS | | | WELL (GOOD, FAIR, POOR). PLEASE PROVIDE PLANS SHOWING | | | THE REPLACEMENT TREES PROPOSED AND INCLUDE THE SIZE, | | | SPECIES AND LOCATION OF PROPOSED MATERIAL. PLEASE | | | PROVIDE A NARRATIVE PRESENTING A REASON FOR REMOVAL OF | | | SAID TREES/PALMS. REASONS FOR REMOVAL SHOULD COINCIDE | | | WITH SEC 94-488 (D)2. PLEASE INCLUDE AND CALL OUT ANY | | | UTILITY INFRASTRUCTURE NEAR WORK PROPOSED INCLUDING | | | OVERHEAD LINES. |
|
|
| |
Print |
|