Plan Review Details - Project Z22050023
Plan Review Stops For Project Z22050023
Review Stop AIPP ART IN PUBLIC PLACES
Rev No 1 Status N Date 06-10-2022 Cont ID  
Sent By scwelter Date 06-10-2022 Time 15:45 Rev Time 0.00
Received By scwelter Date 06-10-2022 Time 15:45 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 06-02-2022 Cont ID  
Sent By pleduc Date 06-02-2022 Time   Rev Time 0.00
Received By pleduc Date 06-02-2022 Time 12:08 Sent To  
Notes
2022-06-02 12:11:28FIRE HAS NO OBJECTIONS TO THE PROPOSED AND APPROVES.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop L LANDSCAPING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PARK PARKING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop POLICE POLICE
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PU PUBLIC UTILITIES
Rev No 1 Status P Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By mtechnow Date 06-07-2022 Time 16:44 Sent To  
Notes
***NONE***

Review Stop PW PUBLIC WORKS
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop STORM STORMWATER
Rev No 2 Status P Date 08-12-2022 Cont ID  
Sent By tward Date 08-12-2022 Time 17:05 Rev Time 0.00
Received By tward Date 08-12-2022 Time 17:05 Sent To  
Notes
***NONE***

Review Stop STORM STORMWATER
Rev No 1 Status F Date 06-06-2022 Cont ID  
Sent By tward Date 06-06-2022 Time 13:13 Rev Time 0.00
Received By tward Date 06-06-2022 Time 13:15 Sent To  
Notes
2022-06-06 13:15:21THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. ENLARGE/RESHAPE THE LANDSCAPE ISLAND ADJACENT TO THE
 DUMPSTER TO PREVENT RIGHT TURNS TO THE NORTH. POST A NO
 RIGHT TURN SIGN IN THE ISLAND.
  
 2. SUGGEST SLOPING PIPE BETWEEN STRUCTURES STR. 2 AND
 STR. 3.
  
 3. OKEECHOBEE BLVD IS MAINTAINED BY FDOT.
  
 4. WILL TRAFFIC ARROW LANE MARKINGS BE MULTIPLE CARETS
 INSTEAD OF ARROWS?
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA, INCLUDING THE BASIN C-51 RULE. STORMWATER
 CALCULATIONS WILL BE REVIEWED WITH THE ENGINEERING
 PERMIT SUBMITTAL.
  
 2. PROVIDE COPY OF SFWMD ERP PERMIT MODIFICATION BEFORE
 START OF CONSTRUCTION.
  
 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  

Review Stop SURVEY SURVEYING
Rev No 1 Status P Date 06-01-2022 Cont ID  
Sent By vnoel Date 06-01-2022 Time 10:20 Rev Time  
Received By vnoel Date   Time   Sent To  
Notes
2022-06-01 10:21:14NO COMMENTS.

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 2 Status P Date 07-26-2022 Cont ID  
Sent By   Date 07-26-2022 Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
2022-07-26 12:15:23NO FURTHER COMMENTS
  
 1) DISREGARD/SATISFIED. PROVIDE A COPY OF THE ORIGINAL
 DSI
 2) SATISFIED. PROVIDE A COPY OF THE AMENDMENT
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status F Date 06-08-2022 Cont ID  
Sent By   Date 06-08-2022 Time   Rev Time  
Received By   Date 06-08-2022 Time   Sent To  
Notes
2022-06-08 22:07:431) PROVIDE A COPY OF THE ORIGINAL DSI
 2) PROVIDE A COPY OF THE AMENDMENT
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop Z ZONING
Rev No 1 Status   Date 06-03-2022 Cont ID  
Sent By afowlkes Date   Time 14:54 Rev Time 0.00
Received By afowlkes Date 06-03-2022 Time 14:53 Sent To  
Notes
***NONE***