Plan Review Details - Project Z22050021
Plan Review Stops For Project Z22050021
Review Stop AIPP ART IN PUBLIC PLACES
Rev No 3 Status P Date 10-03-2022 Cont ID  
Sent By swelter Date 10-03-2022 Time 09:37 Rev Time 0.00
Received By swelter Date 10-03-2022 Time 10:11 Sent To  
Notes
2022-10-03 10:09:14PASSED - ART ASSESSMENT COMPLETED AND SUBMITTED ON
 10.3.2022 WITH THE FOLLOWING CONDITIONS:
 PROJECT IDENTIFIES PUBLIC ART AT THE CORNER OF DIXIE
 AND LAKE VIEW, AND THE SCUPLTURE IS MARKED WITHIN THE
 PLANTER. THE FUTURE ARTWORK IF INSTALLED WITHIN THE
 PLANTER NEEDS TO BE PLACED ON A PLINTH OR LARGE
 PEDESTAL TO SEPARATE THE PUBLIC ART REQUIREMENT FORM
 LANDSCAPE REQUIREMENTS. FURTHER, ESCROW OF THE 1% NEEDS
 TO BE COMPLETED AND SUBMITTED TO SYBILLE WELTER
 [email protected] BEFORE OR AT TIME OF BUILDING PERMIT
 FEES.
  

Review Stop AIPP ART IN PUBLIC PLACES
Rev No 2 Status F Date 07-08-2022 Cont ID  
Sent By scwelter Date 07-08-2022 Time 10:31 Rev Time 0.00
Received By swelter Date 07-08-2022 Time 10:51 Sent To  
Notes
2022-07-08 10:48:271. THE ART PROVIDED WITHIN THE FOOTPRINT OF THE
 BUILDING DOES NOT MEET THE LOCATION REQUIREMENT OF THE
 PUBLIC ART ORDINANCE.
 2. RENDERINGS SHOW AN ART FEATURE ON THE CORNER OF
 DIXIE AND LAKEVIEW; HOWEVER, THIS IS NOT CONSISTENT
 WITH THE SITE PLAN THAT DEMONSTRATES A PLANTER.
 3. IF OPTION 1 ART ON SITE IS BEING CONSIDERED, THEN
 THE PLACEMENT OF THE ART MUST MEET THE LOCATION
 REQUIREMENT FURTHER, RENDERING AND SITE PLAN MUST BE
 CONSISTENT.
 4. THE DECORATIVE GOLD LEAF ON THE WALL AT THE CORNER
 OF LAKEVIEW AND DIXIE NEEDS TO BE IDENTIFIED AS IT
 APPEARS TO BE A DECORATIVE PIECE AND IN ITS CURRENT
 ITERATION NOT MEET THE PUBLIC ART REQUIREMENT.
 5. IF THE ART CANNOT BE ACCOMMODATED TO MEET THE PUBLIC
 ART CRITERIA AND REQUIREMENTS SET FORTH IN THE
 ORDINANCE THE DEVELOPER HAS THE OPTION TO CONTRIBUTE TO
 THE PUBLIC ART ACCOUNT AT .75% (-25%) OF THE 1% TOTAL
 CONSTRUCTION COSTS.
 6. CONTACT SYBILLE WELTER [email protected] FOR AN ART
 ASSESSMENT APPLICATION, WHICH NEEDS TO BE PROVIDED TO
 COMPLETE SITE APPROVAL PROCESS.
 7. AT THE TIME OF BUILDING PERMIT FEES, THE EVIDENCE OF
 ESCROW IF CHOOSEN OPTION 1 OR THE CONTRIBUTION INTO THE
 PUBLIC ART FUND MUST BE COMPLETED.
  
  

Review Stop AIPP ART IN PUBLIC PLACES
Rev No 1 Status F Date 06-10-2022 Cont ID  
Sent By scwelter Date 06-10-2022 Time 15:41 Rev Time 0.00
Received By scwelter Date 06-10-2022 Time 15:43 Sent To  
Notes
2022-06-10 15:42:55PUBLIC ART REQUIREMENT:
 TOTAL CONSTRUCTION COSTS OF THIS DEVELOPMENT ARE OVER
 $500,000 IT IS SUBJECT TO THE PUBLIC ART REQUIREMENT AS
 PER CITY ORDINANCE.
 SECTION 78-129: ALL PRIVATE DEVELOPMENT PROJECTS,
 INCLUDING NEW CONSTRUCTION, OR THE RENOVATION OR
 IMPROVEMENT OF AN EXISTING BUILDING, WHERE TOTAL
 CONSTRUCTION COSTS ARE EQUAL TO OR GREATER THAN
 $500,000 ARE SUBJECT TO THE PUBLIC ART REQUIREMENT.
 OPTION 1: INSTALL ARTWORK ON THE DEVELOPMENT SITE
 VALUED IN AN AMOUNT NOT LESS THAN ONE PERCENT OF THE
 TOTAL CONSTRUCTION COSTS; OR
 OPTION 2: CONTRIBUTE AN AMOUNT EQUAL TO 75 PERCENT OF
 ONE PERCENT OF THE TOTAL CONSTRUCTION COSTS FOR DEPOSIT
 TO THE PUBLIC ART ACCOUNT.
 A COMPLETED PUBLIC ART ASSESSMENT APPLICATION IS
 REQUIRED AT TIME OF BUILDING PERMIT SUBMITTAL.
  
 CONTACT SYBILLE WELTER, ADMINISTRATOR OF PUBLIC ART &
 CULTURE AT [email protected] TO OBTAIN AN ART ASSESSMENT
 APPLICATION AND REVIEW THE REQUIREMENTS.
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 06-08-2022 Cont ID  
Sent By rbrown Date 06-08-2022 Time 19:58 Rev Time 0.00
Received By rbrown Date 06-08-2022 Time 19:58 Sent To  
Notes
2022-06-08 20:04:45DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR THE BUILDING PERMIT APPLICATION.
  
 2. DEMOLITION OF THE EXISTING BUILDINGS. AN ASBESTOS
 SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT
 REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH
 COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963,
 OR BY EMAIL: [email protected]
  
 3. LOCATION OF ACCESSIBLE PARKING SPACES. LEVEL 3 PLAN,
 SHEET A1.03, SHOWS 2 OF THE ACCESSIBLE PARKING SPACES
 IS THE NORTH-WEST CORNER OF THE PARKING GARAGE.
 ACCESSIBLE PARKING SPACES SHOULD BE THE CLOSEST PARKING
 SPACES TO THE AREA OF THE BUILDING THAT THEY SERVE.
 WHAT AREA/OCCUPANCY OF THE BUILDING ARE THOSE 2 SPACES
 SERVING. PER SECTION 208.3 OF FLORIDA ACCESSIBILITY
 CODE, ACCESSIBLE PARKING SPACES ARE TO BE LOCATED ON
 THE SHORTEST POSSIBLE ROUTE OF TRAVEL FROM ADJACENT
 PARKING TO AN ACCESSIBLE ENTRANCE. THE DESIGN OF
 ACCESSIBLE PARKING SPACES SHALL COMPLY WITH SECTION 502
 OF FLORIDA ACCESSIBILITY CODE
  
 4. VAN ACCESSIBLE PARKING SPACES. PER SECTION 208.2.4
 OF FLORIDA ACCESSIBILITY CODE, ONE IN EVERY SIX
 REQUIRED ACCESSIBLE SPACES (AT LEAST ONE) IN A PARKING
 STRUCTURE, SHALL BE ?VAN ACCESSIBLE? AND DESIGNED IN
 ACCORDANCE WITH SECTION OF 502 OF FLORIDA ACCESSIBILITY
 CODE (VERTICAL CLEARANCE NOT LESS THAN 98 INCHES AT
 SPACE AND VEHICULAR ACCESS ROUTE)
  
 5. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT,
 THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR
 THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT,
 AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE
 FLORIDA BUILDING CODE.
  
 6. BUILDING LOCATION RELATIVE TO THE PROPERTY LINE AND
 OTHER STRUCTURES. WHEN SUBMITTED FOR BUILDING PERMIT,
 COMPLIANCE WITH ALL BUILDING SEPARATION, PERCENTAGE OF
 OPENINGS AND OPENING PROTECTIVE REQUIREMENTS OF
 CHAPTERS 6 AND 7 OF THE FLORIDA BUILDING CODE SHALL BE
 VERIFIED.
  
 7. ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE DOES
 NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL OPENINGS TO
 MEET THE DEFINITION OF AN OPEN PARKING GARAGE, IT WILL
 BE CONSIDERED AN ENCLOSED PARKING GARAGE AND MUST HAVE
 EXHAUST SYSTEMS. THE EXHAUST SYSTEMS SHALL BE DESIGNED
 TO MINIMIZE NOISE LEVELS USING INLINE FAN SILENCERS OR
 OTHER APPROVED METHODS.
  
 8. GREASE INTERCEPTOR. A GREASE INTERCEPTOR WILL BE
 REQUIRED. FOR INFORMATION ON THE REQUIRED TYPE, SIZE
 AND LOCATION, PLEASE CONTACT RYAN BROWN, CHIEF PLUMBING
 INSPECTOR, DEVELOPMENT SERVICES DEPARTMENT, AT (561)
 805-6692, OR BY EMAIL: [email protected]
  
 9. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS,
 GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND
 OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS,
 SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC.
  
 10. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND
 CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF
 CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL
 NEIGHBORING PROPERTIES.
  
 11. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER
 AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY,
 INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE
 CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF
 NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION
 THAT MAY AFFECT THE USE OF THEIR PROPERTY.
  
 12. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT
 TO ART LIFE ASSESSMENT UNDER THE CITY OF WEST PALM
 BEACH ART IN PUBLIC PLACES (AIPP) PROGRAM. FOR ADVICE
 ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP
 ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC
 PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL:
 [email protected]
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 4 Status P Date 09-23-2022 Cont ID  
Sent By rrossano Date 09-23-2022 Time   Rev Time 0.00
Received By rrossano Date 09-23-2022 Time   Sent To  
Notes
2022-09-23 17:36:50PASSED WITH PROVISO: CCTV TO BE PROVIDED WEEK OF
 10/24/22.

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 3 Status F Date 08-15-2022 Cont ID  
Sent By rrossano Date 08-15-2022 Time   Rev Time 0.00
Received By rrossano Date 08-15-2022 Time   Sent To  
Notes
2022-08-15 11:37:56WILL PASS ENGINEERING UPON RECEIPT OF REQUESTED CITY
 UTILITY CCTV.

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 2 Status F Date 07-07-2022 Cont ID  
Sent By rrossano Date 07-07-2022 Time   Rev Time 0.00
Received By rrossano Date 07-07-2022 Time   Sent To  
Notes
2022-07-07 18:29:49O PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER
 INFRASTRUCTURE ALONG ENTIRE PROJECT FRONTAGE (CONDITION
 OF SITE PLAN APPROVAL).
  
 FOLLOW UP COMMENT:
 PLEASE CLARIFY RESPONSE (?ACKNOWLEDGED.?). IS SANITARY
 CCTV BEING OBTAINED AT THIS TIME?
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status F Date 06-08-2022 Cont ID  
Sent By rrossano Date 06-08-2022 Time   Rev Time 0.00
Received By rrossano Date 06-08-2022 Time   Sent To  
Notes
2022-06-08 16:40:42COMMENTS FROM RICK ROSSANO, SR. PROJECT COORDINATOR,
 ENGINEERING SERVICES AT 561-494-1098 [email protected]
 GENERAL:
 O PLEASE RESPOND TO ALL COMMENTS IN WRITING, AND
 INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER
 (Z-XXXXXXXX).
 O THE CITY OF WEST PALM BEACH HAS A NUMBER OF
 REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY
 AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND
 WASTEWATER UTILITIES WITHIN THE CITY. PLEASE SEE
 DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AT THE LINK
 BELOW:
 A. HTTP://WPB.ORG/CMSPAGES/GETAMAZONFILE.ASPX?PATH=~\WP
 B_WEBSITE\MEDIA\ENGINEERING\DEVELOPMENT-APPLICATION-FUL
 L-PACKAGE_2016.PDF&HASH=7BD4DD7EB6115181D8C5977BCC02A97
 B1960045731D3658206F27451722716EF
 B. THIS AND OTHER RELATED ENGINEERING DOCUMENTS CAN BE
 FOUND HERE:
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
 C. ALSO SEE: CODE OF ORDINANCES, CITY OF WEST PALM
 BEACH, FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08,
 ADOPTED SEPT. 22, 2008. (SUPPLEMENT NO. 18)
 CHAPTER 90 UTILITIES, ARTICLE I. IN GENERAL,
 SEC. 90-7. POLICY REGARDING EXTENSION OF WATER OR SEWER
 SERVICE FACILITIES OF THE CITY.
 THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE
 CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY
 BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS,
 BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION.
 O AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR
 MORE INFORMATION, REFER TO THE LINK BELOW:
 A. HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PU
 BLICATIONS/BACKFLOW-CROSS-CONNECTION- CONTROL-MANUAL
 O PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY
 OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC
 RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF
 YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE
 MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL
 IN THE WPB ENGINEERING SERVICES DEPARTMENT AT
 [email protected] OR 561-494-1079 FOR FURTHER
 ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION
 ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD
 SURVEY, POT-HOLING, SOFT DIGS ETC.
 O PROVIDE EXISTING AND PROPOSED PERVIOUS AND IMPERVIOUS
 DATA.
  
 BACKFLOW ASSEMBLY AND METERS:
 O SHOW AND LABEL ANY EXISTING OR PROPOSED WATER
 SERVICES AND WATER METERS, ALONG WITH WHAT IS HAPPENING
 TO THEM.
 O SHOW EXISTING AND PROPOSED DEDICATED UTILITY
 EASEMENTS TO ALLOW ACCESS FOR CITY PERSONNEL TO
 PROPOSED UTILITY WATER METERS. VERIFY THAT THERE ARE NO
 STRUCTURES WITHIN EASEMENT.
 O PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED LOCATION
 OF WATER METER AND BACKFLOW
 PREVENTION.
 O BACKFLOWS SHALL BE INSTALLED ON PRIVATE PROPERTY
 OUTSIDE OF EASEMENTS AND RIGHTS OF WAY. DOMESTIC WATER
 METERS SHALL BE INSTALLED IMMEDIATELY ADJACENT TO
 PROPERTY LINE. 3 INCH AND LARGER WATER METERS SHALL BE
 INSTALLED ABOVE-GROUND ONLY.
 O CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA (MAKE
 NOTE USC APPROVED) AND FIRE BACKFLOW PREVENTER AS DCDA.
  
 WATER/WASTEWATER PLAN:
 O PROVIDE VERTICAL DATUM AND DATUM CONVERSION
 INFORMATION (NAVD 1988 AND NGVD 1929).
 O SHOW PROJECT ADDRESS ON ALL PLAN SHEETS.
 O PROVIDE LEGEND ON ALL PLAN SHEETS TO INCLUDE
 STREETLIGHT, SIGN POSTS, TRANSFORMER BOXES ETC.
 O PLANS SHALL SHOW EXISTING AND PROPOSED LOCATIONS AND
 DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND
 SEWER LINES AND CLEANOUTS, INCLUDING STUBS TO EACH
 PROPERTY LINE FOR WATER AND SANITARY SEWERS, THE MAKE
 AND MODEL OF ALL VALVES, POTABLE AND IRRIGATION METERS,
 BACKFLOWS, FIRE HYDRANTS AND FDCS, AND OTHER DEVICES TO
 BE INSTALLED ON THE SYSTEM, CATCH BASINS, CULVERTS,
 DITCHES INCLUDING GRADES, PIPES SIZES, MATERIALS,
 ELEVATIONS, ASSUMPTIONS, CALCULATIONS, INVERT
 ELEVATIONS FOR ALL INLETS AND MANHOLES AND PROFILES OF
 SANITARY SEWER LINES.
 O GATE VALVE BOXES SHALL NOT BE INSTALLED IN CURB OR
 SIDEWALK. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE
 PROFILE VIEW.
 O DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN
 VIEW FOR ALL SANITARY AND STORM SEWERS.
 O SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL.
 O PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED
 UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC,
 ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION
 FACILITIES LOCATED ON THE RIGHT-OF-WAY.
 O PROVIDE PROFILE AND CLEARANCES BETWEEN WATER, SEWER
 AND STORM LINES PER CITY OF WEST PALM BEACH STANDARD
 DETAIL GN-2 SERIES, AT ALL UTILITY CROSSINGS.
 O SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE DIRECTLY
 TO ENGINEERING (SHEET 33 OF CITY OF WPB DEVELOPMENT
 APPLICATION). PROVIDE CALCULATIONS ON PLANS OF EXISTING
 AND PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE,
 MAXIMUM AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS
 SHALL BE PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008
 FOR WATER.
 O PROVIDE FIRE FLOW TEST DATA.
 O PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER
 INFRASTRUCTURE ALONG ENTIRE PROJECT FRONTAGE (CONDITION
 OF SITE PLAN APPROVAL).
 O CUT AND CAP UTILITIES NOT IN USE AND REMOVE ANY
 ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY
 ROW.
 O WHEN PROPOSED, WATER MAINS IN CITY RIGHT OF WAY SHALL
 BE MADE OF DUCTILE IRON PIPE (NOT PVC) AND SPECIFY
 PROPOSED LENGTH IN FEET.
 O CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY
 SEWER ARE REQUIRED.
 O PROVIDE CLEANOUTS FOR PROPOSED SANITARY LINE ONSITE
 JUST INSIDE PROPERTY LINE, AT JOINTS AND EVERY 75 FEET.
 O ADD NOTE TO PLANS SPECIFYING CITY?S DOWNSTREAM LIFT
 STATION NUMBER.
 O PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR
 PROPOSED SANITARY LATERALS.
 O LABEL WATER LINES AS PRIVATE WHERE APPLICABLE.
 O PLEASE SHOW AND LABEL EXISTING AND PROPOSED GREASE
 TRAPS (IF ANY).
 O PER CITY STANDARDS MAINTAIN MINIMUM DISTANCE BETWEEN
 OUTSIDE DIAMETER OF CITY PIPE AND ROOT BARRIER.
  
 FORMAL ENGINEERING REVIEW:
 O FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND NPDES
 NOI REQUIREMENTS WILL BE ENFORCED.
 - AN NOI IS REQUIRED FOR PROJECTS THAT:
 - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS
 THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF
 DEVELOPMENT OR SALE;
 - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE
 STATE OR TO SURFACE WATERS OF THE STATE THROUGH A
 MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4).
 - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF
 CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION
 THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL
 SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT
 OF THE 10-2 CERTIFICATION.
 O FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 EASEMENT FOR PLACEMENT OF PROPOSED WATER METERS.
 O FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES OF
 WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS.
 O FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING
 APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT
 SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING
 SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED
 LEAD-FREE DESIGN.
 O FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY LINES
 ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY
 LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT
 PARCELS.
 O FOR FORMAL ENGINEERING SUBMITTAL, IF WATER LINES ARE
 BEING REPLACED IN ROW, SHOW ADJACENT PARCEL ADDRESSES.
 O FOR FORMAL ENGINEERING SUBMITTAL, ADD NOTE TO PROVIDE
 50 FT. PAVEMENT RESTORATION TRANSITION ON EACH SIDE OF
 PROPOSED TRENCH IN CITY MAINTAINED ROADWAY AREAS PER
 CITY OF WPB STANDARD DETAIL GC-8.
 O FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 CALCULATIONS OF PERVIOUS AND IMPERVIOUS AREAS FOR
 PROPOSED IMPROVED AREAS.
  
  
  
 QUESTIONS AND COORDINATION CONTACTS:
 O MARK HURLEY, FIELD CUSTOMER SERVICE SUPERVISOR WITH
 CITY OF WPB PUBLIC UTILITIES, REGARDING PLACEMENT OF
 BACKFLOW DEVICES AND WATER METERS. CONTACT HIM AT
 561-822-2262 OR [email protected]
 O MIKE TECHNOW, PROJECT ENGINEER, PUBLIC UTILITIES
 DEPARTMENT AT 561-494-1047 OR [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 06-02-2022 Cont ID  
Sent By pleduc Date 06-02-2022 Time   Rev Time 0.00
Received By pleduc Date 06-02-2022 Time 10:45 Sent To  
Notes
2022-06-02 11:34:16THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC,
 FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM
 BEACH FIRE RESCUE.
  
 THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE
 DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE.
 ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS
 ARE SUBMITTED FOR PERMIT.
  
 THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE
 PROPOSED PROJECT; HOWEVER, THE FOLLOWING COMMENTS ARE
 PROVIDED AND MAY NEED FURTHER CLARIFICATIONS WHERE
 APPLICABLE.
  
 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY
 WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE
 PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A
 PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED
 TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN
 STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY
 MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER
 PROTECTION.
  
 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY
 IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING
 ALL CONSTRUCTION ACTIVITIES.
  
 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM
 ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION.
 ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND
 AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT
 WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS.
  
 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE
 REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE
 ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS.
  
 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH
 THE 7TH EDITION OF THE FLORIDA FIRE PREVENTION CODE,
 INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES.
  
 6. ALL PARKING STRUCTURES SHALL COMPLY WITH NFPA 88A,
 PARKING STRUCTURES AND NFPA 101, THE LIFE SAFETY CODE,
 INCLUDING MORE SPECIFICALLY, CHAPTER 42 STORAGE
 OCCUPANCIES (PARKING STRUCTURES)
  
 7. A NFPA 13 COMPLAINT FIRE SPRINKLER SYSTEM AND NFPA
 14 COMPLIANT WET STANDPIPE SYSTEM ARE REQUIRED FOR THIS
 STRUCTURE. TEMPORARY STANDPIPES ARE REQUIRED WHEN THE
 BUILDING REACHES THREE LEVELS OR THIRTY FEET WHILE
 BEING CONSTRUCTED.
  
 SEPARATE SHOP DRAWINGS, ARE REQUIRED TO BE SUBMITTED,
 REVIEWED AND APPROVED BY THE FIRE PREVENTION BUREAU
 PRIOR TO ANY INSTALLATION.
  
 IT IS RECOMMENDED FOR HIGH RISES TO HAVE TWO SEPARATE
 FDC LOCATIONS REMOTELY LOCATED TO SERVE THE STANDPIPE
 SYSTEM.
  
 ONE PROPOSED FIRE HYDRANT IS INDICATED ALONG LAKEVIEW.
  
 A SECOND ONE IS RECOMMENDED TO BE INSTALLED ALONG
 OKEECHOBEE BLVD.
  
  
 7A. PER NFPA 14
  
 6.4.5.4* FIRE DEPARTMENT CONNECTIONS SHALL BE LOCATED
 NOT MORE THAN 100 FT (30.5 M) FROM THE NEAREST FIRE
 HYDRANT CONNECTED TO AN APPROVED WATER SUPPLY.
  
 ONE FDC IS INDICATED ALONG LAKEVIEW; HOWEVER IT APPEARS
 TO BE LOCATED UNDER AND WITHIN THE PARKING GARAGE. IT
 IS RECOMMENDED TO BE RELOCATED FROM UNDER/WITHIN THE
 PARKING GARAGE TO AN AGREED UPON LOCATION ALONG THAT
 EXTERIOR AREA WITHIN 100' OF THE FIRE HYDRANT. FOR
 CONSIDERATION PURPOSES, IT CAN BE WALL MOUNTED.
  
 THE SECOND RECOMMENDED FDC LOCATION CAN BE ALONG
 OKEECHOBEE BLVD IN AN AGREED UPON LOCATION ALONG THAT
 EXTERIOR AREA WITHIN 100' OF THE RECOMMENDED SECOND
 FIRE HYDRANT. FOR CONSIDERATION PURPOSES, IT CAN BE
 WALL MOUNTED.
  
  
 7B. PER NFPA 1
  
 18.3 WATER SUPPLIES.
 18.3.1* AN APPROVED WATER SUPPLY CAPABLE OF SUPPLYING
 THE REQUIRED FIRE FLOW FOR FIRE PROTECTION SHALL BE
 PROVIDED TO ALL PREMISES UPON WHICH FACILITIES,
 BUILDINGS, OR PORTIONS OF BUILDINGS ARE HEREAFTER
 CONSTRUCTED OR MOVED INTO THE JURISDICTION. THE
 APPROVED WATER SUPPLY SHALL BE IN ACCORDANCE WITH
 SECTION 18.4.
  
 PER FLORIDA ADMINISTRATIVE CODE SECTION 61G15-32.004,
 FIRE PROTECTION ENGINEERING DOCUMENTS SHALL INCLUDE THE
 POINT OF SERVICE FOR THE WATER SUPPLY, A LIST OF
 APPLICABLE NFPA STANDARDS APPLICABLE TO THE PROJECT,
 CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR
 AREA, SUPPRESSION SYSTEM TYPE, DESIGN DENSITIES, WATER
 SUPPLY DATA (FIRE PUMP DATA, HYDRANT FLOW TEST DATA)
 AND ANY PERFORMANCE BASED INFORMATION SUCH AS
 PRE-ENGINEERED SYSTEMS.
  
 FOR THE PROPOSED FIRE PUMP(S) , WHAT IS(ARE) THE
 PRIMARY AND SECONDARY POWER SOURCES?
  
 7C. THE LOCATION OF THE DDCV FIRE LINE LOCATION SHALL
 MEET THE REQUIREMENTS OF NFPA 24 AND SHALL BE
 COORDINATED WITH THE OFFICE OF FIRE MARSHAL, THE CITY'S
 ENGINEERS OFFICE, THE LANDSCAPE PLANNER, AND THE CITY'S
 PLANNING AND ZONING OFFICE.
  
 IT APPEARS THAT A FIRE DDCV IS LOCATED WITHIN THE
 PARKING GARAGE AND IF APPROVED BY STAFF AT THIS
 LOCATION, IT WOULD REQUIRE PROTECTION FROM ACCIDENTAL
 VEHICLE CONTACT.
  
  
 8. A NFPA 72 COMPLIANT MONITORED FIRE ALARM SYSTEM IS
 REQUIRED FOR THIS STRUCTURE. SEPARATE SHOP DRAWINGS,
 ARE REQUIRED TO BE SUBMITTED, REVIEWED AND APPROVED BY
 THE FIRE PREVENTION BUREAU PRIOR TO ANY INSTALLATION.
  
  
 9. ALL ELEVATORS SHALL BE EQUIPPED WITH A REGION 7
 KEYWAY SYSTEM.
  
 ALL NEW ELEVATORS SHALL CONFORM TO THE FIRE FIGHTER?S
 EMERGENCY OPERATIONS REQUIREMENTS OF ASME A17.1/CSA
 B44, SAFETY CODE FOR ELEVATORS.
  
 ANY BUILDING THAT IS MORE THAN THREE STORIES HIGH OR IN
 WHICH THE VERTICAL DISTANCE BETWEEN THE BOTTOM TERMINAL
 LANDING AND THE TOP TERMINAL LANDING EXCEEDS 25 FEET
 MUST BE CONSTRUCTED TO CONTAIN AT LEAST ONE PASSENGER
 ELEVATOR THAT IS OPERATIONAL AND WILL ACCOMMODATE AN
 AMBULANCE STRETCHER 76 INCHES LONG AND 24 INCHES WIDE
 IN THE HORIZONTAL POSITION.
  
 10. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL
 BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL
 DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS,
 EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A
 PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE
 SAFETY FEATURES AND EQUIPMENT.
  
 A REVIEW OF THE PROPOSED FLOOR LAYOUT INDICATES
 CENTRALLY LOCATED EXIT STAIRS. THIS PROPOSED
 CONFIGURATION MAY REQUIRE A DETAILED REVIEW FOR
 COMPLIANCE WITH THE MINIMUM SEPARATION DISTANCES OF 2
 EXITS REMOTELY LOCATED FROM EACH OTHER PER NFPA 101 CH
 7, MEAND OF EGRESS. IT APPEARS THAT A PERSON LEAVING A
 CERTAIN ROOM CAN ONLY GO IN ONE DIRECTION THAT WOULD
 VIRTUALLY QUALIFY THAT ROUTE AS A SINGLE AND ONLY EXIT.
  
  
 10A. THE LEVEL 8 AMENITY DECK INDICATES A SINGLE EXIT
 FROM THE OPEN POOL DECK AREA AND THE CENTRAL EXITS
 STAIRS WITHIN THE CORE BUILDING. A REVIEW OF THE
 AMEMITY DECK IS REQUIRED TO ENSURE THE THE TOTAL
 OCCUPANCY LOAD CAN BE SERVED BY THESE TWO EXITS. A
 THIRD EXIT STAIR MAY BE REQUIRED FROM THE OPEN POOL
 AREA REMOTELY LOCATED PER NFPA 101, CH 7, MEAND OF
 EGRESS.
  
  
 10B. THE ROOFTOP PLAN INDICATES AN AMENITY DECK WITH
 THE SAME CENTAL EXIT STAIR CONFIGURATION THAT MAY NOT
 MEET THE SEPARATION REQUIREMENTS OF NFPA 101, CH 7
 MEANS OF EGRESS.
  
 A DETAILED REVIEW MAY BE REQUIRED TO ENSURE COMPLIANCE.
  
 11. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS
 DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED
 ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF
 FIRE PREVENTION.
  
 SEE SIMILAR COMMENTS OF 7A ABOVE, ALL NEW FIRE HYDRANTS
 AND FDC?S PLANNED FOR THIS DEVELOPMENT SHALL BE CLOSELY
 COORDINATED WITH THE BUREAU OF FIRE PREVENTION.
  
 12. COMMAND ROOM
  
 THE FIRE COMMAND CENTER SHALL COMPLY WITH NFPA 1,
 CHAPTER 11, BUILDING SERVICES; 11.9 AND SHALL CONTAIN
 THE FOLLOWING FEATURES:
  
 11.9.1 THE LOCATION, DESIGN, CONTENT, AND FIRE
 DEPARTMENT ACCESS OF THE EMERGENCY COMMAND CENTER SHALL
 BE APPROVED BY THE FIRE DEPARTMENT.
  
 11.9.2 THE EMERGENCY COMMAND CENTER SHALL BE SEPARATED
 FROM THE REMAINDER OF THE BUILDING BY A FIRE BARRIER
 HAVING A FIRE RESISTANCE RATING OF NOT LESS THAN 1
 HOUR.
  
 11.9.3 THE EMERGENCY COMMAND CENTER ROOM SHALL BE A
 MINIMUM OF 200 FT2 (19 M2) WITH A MINIMUM DIMENSION OF
 10 FT (3050 MM).
  
 11.9.4 THE FOLLOWING SHALL BE PROVIDED IN THE EMERGENCY
 COMMAND CENTER.
 (1) THE FIRE DEPARTMENT COMMUNICATIONS SYSTEM.
 (2) A TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED
 ACCESS TO THE PUBLIC TELEPHONE SYSTEM
 (3) SCHEMATIC BUILDING PLANS INDICATING THE TYPICAL
 FLOOR PLAN AND DETAILING THE BUILDING CORE, MEANS OF
 EGRESS, FIRE PROTECTION SYSTEMS, FIRE-FIGHTING
 EQUIPMENT AND FIRE DEPARTMENT ACCESS
 (4) WORK TABLE.
 (5) IF APPLICABLE, A HAZARDOUS MATERIAL MANAGEMENT PLAN
 FOR THE BUILDING.
 11.9.5 WHERE OTHERWISE REQUIRED, THE FOLLOWING DEVICES
 OR FUNCTIONS SHALL BE PROVIDED WITHIN THE EMERGENCY
 COMMAND CENTER.
 (1) THE EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM
 CONTROL UNIT.
 (2) FIRE DETECTION AND ALARM SYSTEM ANNUNCIATOR UNIT.
 (3) ANNUNCIATOR UNIT VISUALLY INDICATING THE LOCATION
 OF THE ELEVATORS AND WHETHER THEY ARE OPERATIONAL
 (4) STATUS INDICATORS AND CONTROLS FOR AIR-HANDLING
 SYSTEMS.
 (5) CONTROLS FOR UNLOCKING STAIRWAY DOORS
 SIMULTANEOUSLY
 (6) SPRINKLER VALVE AND WATER FLOW DETECTOR DISPLAY
 PANELS
 (7) EMERGENCY AND STANDBY POWER STATUS INDICATORS
 (8) FIRE PUMP STATUS INDICATORS
 (9) GENERATOR SUPERVISION DEVICES AND MANUAL START AND
 TRANSFER FEATURES.
 (10) PUBLIC ADDRESS SYSTEM, WHERE SPECIFICALLY REQUIRED
 BY OTHER SECTIONS OF THIS CODE
 (11) CONTROLS REQUIRED FOR SMOKE CONTROL
  
 NFPA 101
  
 11.8.6* EMERGENCY COMMAND CENTER.
 11.8.6.1 AN EMERGENCY COMMAND CENTER SHALL BE PROVIDED
 IN A
 LOCATION APPROVED BY THE FIRE DEPARTMENT.
 11.8.6.2 THE EMERGENCY COMMAND CENTER SHALL CONTAIN THE
 FOLLOWING:
 (1) VOICE FIRE ALARM SYSTEM PANELS AND CONTROLS
 (2) FIRE DEPARTMENT TWO-WAY TELEPHONE COMMUNICATION
 SERVICE
 PANELS AND CONTROLS WHERE REQUIRED BY ANOTHER SECTION
 OF THIS
 CODE
 (3) FIRE DETECTION AND FIRE ALARM SYSTEM ANNUNCIATION
 PANELS
 (4) ELEVATOR FLOOR LOCATION AND OPERATION ANNUNCIATORS
 (5) ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME
 A17.1/CSA B44, SAFETY CODE FOR ELEVATORS AND ESCALATORS
 (6) ELEVATOR EMERGENCY POWER SELECTOR SWITCH(ES) WHERE
 PROVIDED
 IN ACCORDANCE WITH ASME A17.1/CSA B44
 (7) SPRINKLER VALVE AND WATERFLOW ANNUNCIATORS
 (8) EMERGENCY GENERATOR STATUS INDICATORS
 (9) CONTROLS FOR ANY AUTOMATIC STAIRWAY DOOR UNLOCKING
 SYSTEM
 (10) FIRE PUMP STATUS INDICATORS
 (11) TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED
 ACCESS TO THE
 PUBLIC TELEPHONE SYSTEM
 (12) STAIRWAY VIDEO MONITORING EQUIPMENT AS REQUIRED BY
 11.8.8
  
  
  
 13. TWO-WAY RADIO COMMUNICATIONS ENHANCEMENT SYSTEMS.
  
 NFPA 1, CHAPTER 11, BUILDING SERVICES; 11.10 TWO-WAY
 RADIO ENHANCEMENT SERVICES.
  
 11.10.1 IN ALL NEW AND EXISTING BUILDINGS, MINIMUM
 RADIO SIGNAL STRENGTH FOR FIRE DEPARTMENT
 COMMUNICATIONS SHALL BE MAINTAINED AT A LEVEL
 DETERMINED BY THE AHJ.
 NFPA 72, 24.9 TWO-WAY RADIO COMMUNICATIONS ENHANCEMENT
 SYSTEMS.
  
 24.9.1 GENERAL.
 24.9.1.1 NON-INTERFERENCE. NO AMPLIFICATION SYSTEM
 CAPABLE
 OF OPERATING ON FREQUENCIES OR CAUSING INTERFERENCE ON
 FREQUENCIES
 ASSIGNED TO THE JURISDICTION BY THE FCC SHALL BE
 INSTALLED
 WITHOUT PRIOR COORDINATION AND APPROVAL OF THE
 AUTHORITY
 HAVING JURISDICTION. THE BUILDING MANAGER/OWNER SHALL
 SUSPEND AND CORRECT OTHER EQUIPMENT INSTALLATIONS THAT
 DEGRADE
 THE PERFORMANCE OF THE PUBLIC SAFETY RADIO SYSTEM OR
 PUBLIC SAFETY RADIO ENHANCEMENT SYSTEM.
 24.9.1.2 APPROVAL AND PERMIT. PLANS SHALL BE SUBMITTED
 FOR
 APPROVAL PRIOR TO INSTALLATION. AT THE CONCLUSION OF
 SUCCESSFUL
 ACCEPTANCE TESTING, A RENEWABLE PERMIT SHALL BE ISSUED
 FOR THE
 PUBLIC SAFETY RADIO ENHANCEMENT SYSTEM WHERE REQUIRED
 BY
 THE AUTHORITY HAVING JURISDICTION.
  
 THE SYSTEM SHALL MAINTAIN A MINIMUM RADIO SIGNAL
 STRENGTH OF -95 DBM FOR THE RADIO SYSTEM USED BY WEST
 PALM BEACH FIRE DEPARTMENT. TESTING SHALL BE BY AN
 ACCEPTABLE NATIONAL STANDARD DOCUMENTING PERCENTAGES
 NOTED ABOVE AND BY ACTUAL RADIO TESTING BY FIRE
 PERSONNEL. IF THE MINIMUM CANNOT BE MAINTAINED, A
 BI-DIRECTIONAL AMPLIFIED SYSTEM SHALL BE INSTALLED WITH
 A MINIMUM 2-HOUR RUN TIME BATTERY BACK-UP.
 PLEASE CONTACT MARK FILLA, PALM BEACH COUNTY PUBLIC
 SAFETY RADIO SYSTEMS MANAGER, [email protected],
 561-233-0837; AS OUR RADIOS OPERATE ON THEIR SYSTEM FOR
 DETAILED RADIO FREQUENCY AND INSTALLATION INSTRUCTIONS.
  
  
 14. KNOX-BOX KEY SYSTEM SHALL BE REQUIRED FOR THIS
 BUILDING.
  
 ANY GATES SHALL BE PROVIDED WITH KNOX KEY ACCESS LOCKS,
 PADLOCKS AND/OR SWITCHES FOR 24 HOUR EMERGENCY ACCESS.
  
  
 15. THE SMOKE CONTROL SYSTEM SHALL COMPLY WITH NFPA
 101, CHAPTER 9, BUILDING SERVICE AND FIRE PROTECTION
 EQUIPMENT, INCLUDING:
  
 THE SMOKE CONTROL SYSTEMS SHALL BE INSTALLED,
 INSPECTED, TESTED, AND MAINTAINED IN ACCORDANCE WITH
 NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS; NFPA 204,
 STANDARD FOR SMOKE AND HEAT VENTING; OR NATIONALLY
 RECOGNIZED STANDARDS, ENGINEERING GUIDES, OR
 RECOMMENDED PRACTICES, AS APPROVED BY THE AUTHORITY
 HAVING JURISDICTION.
  
 THE ENGINEER OF RECORD SHALL CLEARLY IDENTIFY THE
 INTENT OF THE SYSTEM, THE DESIGN METHOD USED, THE
 APPROPRIATENESS OF THE METHOD USED, AND THE REQUIRED
 MEANS OF INSPECTING, TESTING, AND MAINTAINING THE
 SYSTEM.
  
 ACCEPTANCE TESTING SHALL BE PERFORMED BY A SPECIAL
 INSPECTOR IN ACCORDANCE WITH SECTION 9.9.
  
 16. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT
 DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL.
  
 17. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING
 PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH
 THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop L LANDSCAPING
Rev No 4 Status P Date 09-29-2022 Cont ID  
Sent By rcaranci Date 09-29-2022 Time 16:22 Rev Time 0.00
Received By rcaranci Date 09-29-2022 Time 16:22 Sent To  
Notes
2022-09-29 16:24:16FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: 320 LAKEVIEW Z22050021
 SEPTEMBER 29, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 1. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE
 TREES AND PALMS IN GOOD CONDITION TO BE PRESERVED ON
 SITE OR RELOCATED. ANSI A 300 (PART 5) STANDARDS
 SPECIFY EXAMPLES OF SUITABILITY RATINGS OF GOOD,
 MODERATE, OR POOR FOR RELOCATION. PROVIDE THE ARBORISTS
 REPORT RATING THE CONDITION AND RELOCATION POTENTIAL
 FOR THE NATIVE TREES AND PALMS, IT WAS NOT LOCATED IN
 THE SUBMITTAL. NON NATIVE TREES AND PALMS ARE NOT
 REQUIRED TO BE RELOCATED. THERE ARE 3 SABAL PALMS
 LISTED AS GOOD CONDITION THAT MUST BE RELOCATED.
  
 2. MAKE THE FOLLOWING CORRECTIONS TO THE TREE
 DISPOSITION LIST:
 ??? SATISFIED. ONLY TREES PROPOSED TO BE REMOVED WITH A
 CANOPY DIAMETER OF 20 FEET OR MORE SHOULD HAVE THE
 MITIGATION SQUARE FOOTAGE CALCULATED BASED ON THE
 ACTUAL DIAMETER. TREES LESS THAN 20 FEET CANOPY
 DIAMETER AND PALMS SHOULD SHOW THE CATEGORY MITIGATION
 DUE. THE TREE CATEGORY LIST IS AVAILABLE FROM CITY
 STAFF.
 ??? SATISFIED. SHOW ONE COLUMN ON THE DISPOSITION CHART
 FOR MITIGATION DUE FOR REMOVALS ONLY AND PROVIDE THE
 TOTAL SQUARE FOOTAGE.
  
 3. SATISFIED. THE DIAGRAM OF THE REQUIRED AND PROVIDED
 PUBLIC AND PRIVATE OPEN SPACE AREAS FOR OBD 25 ZONING
 DISTRICT ON SHEET LP-4 IDENTIFIES THE TYPE OF PUBLIC
 OPEN SPACE AS PLAZA AS ALLOWED BY TABLE IV-7 AND
 DEFINITIONS IN SECTION 94-109. THE PRIVATE OPEN SPACE
 AREA IS IDENTIFIED AS INTERIOR COURTYARD BUT DOES NOT
 MEET THE DEFINITION. THE OPEN SPACE TYPE SHOULD BE
 ROOFTOP GARDEN AND THE REQUIREMENTS SHOWN.
 7/21/22 MAKE THE FOLLOWING CORRECTIONS:
 ??? ALL CALCULATIONS FOR PLAZA REQUIREMENTS MUST BE
 CALCULATED BASED ON THE PROVIDED AREA OF 2010 SQ FT.
 AND THE PROVIDE SHOWN THAT MEETS OR EXCEEDS THE
 REQUIRED.
 ??? VEGETATED AREA OF 503 SQ FT IS REQUIRED
 ??? OVERHEAD COVER MIN IS 201 SQ FT AND MAX IS MAX IS
 402 SQ FT
 ??? TREE CANOPY CREDITS NEED TO BE REVISED. COCONUT
 PALM DOES NOT QUALIFY AS A LARGE PALM. CALLIANDRA WOULD
 BE A SMALL TREE FOR 150 SQ FT. CHANGE TO TREES THAT
 WILL PROVIDE THE INTENDED SHADE.
 ??? FOR PRIVATE OPEN SPACE, DO NOT COUNT COCONUTS,
 COUNT ONLY 12 EAST PALATKA HOLLY AS MEETING THE 300 SQ
 FT EACH FOR TYPE 2: MEDIUM TREE FOR TOTAL 3600 SQ FT
 PROVIDED AND 2819 REQUIRED.
 ??? FOR ROOFTOP GARDEN, THERE APPEARS TO BE PART OF THE
 DESIGNATED OPEN SPACE AREA COVERED BY A ROOF AREA ON
 THE SOUTH SIDE OF THE POOL THAT IS INCONSISTENT BETWEEN
 SHEETS L-4 AND LP-4.
 ??? SHEET LP-2 NEEDS TO SHOW THE OUTLINE OF THE PRIVATE
 OPEN SPACE AREA.
  
 4. SATISFIED. INCLUDE A PLANT LIST OF THE TREES, SHRUBS
 AND GROUNDCOVER PROPOSED FOR EACH OPEN SPACE AREA AND
 SHOW THE CREDITS GIVEN FOR TREE CANOPY SQUARE FOOTAGE
 BASED ON TABLE IV-8.
 SEE COMMENT #3 FOR CORRECTIONS.
  
 5. SATISFIED. IDENTIFY RELOCATED TREES OR PALMS ON THE
 PLANT LIST AND COUNT THEM TOWARD THE REQUIRED TREES.
  
 6. SATISFIED. PROVIDE CALCULATIONS FOR REQUIRED STREET
 TREES AT MAXIMUM SPACING EVERY 30 FEET OR PORTION
 THEREOF FOR EACH STREETSCAPE LENGTH, AND SHOW THE
 NUMBER PROVIDED PER SECTION 94-113.
  
 7. SATISFIED. PROVIDE LOCATIONS AND DETAIL FOR THE
 REQUIRED STRUCTURAL SOIL UNDER HARDSCAPE PER SECTION
 94-113 AND PROVIDE THE TYPICAL DETAIL FOR INSTALLATION.
 THE AREA MUST BE 9 X14 FT PARALLEL TO THE CURB FOR EACH
 TREE CONSISTING OF PLANTING AREA AND/OR STRUCTURAL
 SOIL.
  
 8. SATISFIED. ROYAL PALMS SHOULD BE USED ON THE
 LAKESIDE AND OKEECHOBEE STREETSCAPES AND LIVE OAKS ON
 THE SOUTH DIXIE SIDE. STAFF RECOMMENDS ADDING SMALLER
 SHADE TREES BETWEEN THE ROYAL PALMS TO PROVIDE
 ADDITIONAL SHADE FOR THE SIDEWALKS.
  
 9. SATISFIED. STREET TREES MUST MEET THE MINIMUM HEIGHT
 OF 20 FEET AND ROYAL PALMS MUST BE AT LEAST 14 FEET OF
 GREY WOOD TO ASSURE THE FRONDS WILL MEET THE 13.5 FEET
 REQUIRED FOR STREET CLEARANCE.
  
 10. SATISFIED. SHOW ALL EXISTING AND PROPOSED WATER AND
 SEWER AND DRAINAGE LINES ON THE LANDSCAPE PLAN. SHOW
 LOCATIONS OF BACKFLOWS AND ADJUST LOCATIONS OF UTILITY
 LINES TO RESOLVE CONFLICTS WITH EXISTING AND PROPOSED
 TREES AND LANDSCAPING.
  
 11. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L.
 PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT
 MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT
 TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE
 LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH
 FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH
 FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED
 ON THE PLANT LIST.
  
 12. SATISFIED. PROVIDE SCREENING HEDGES FOR ALL GROUND
 MOUNTED VALVES AND EQUIPMENT AND ADD A NOTE THAT ALL
 EQUIPMENT WILL BE SCREENED.
 ADDITIONAL COMMENTS 7/21/22:
  
 13. SATISFIED. REVISE THE TREE MITIGATION PROVIDED
 CHART ON SHEET TD-1 TO INCLUDE ALL PALMS AND TREES ON
 THE PLANT LIST INCLUDING STREET TREES. ASSIGN THE
 CATEGORY CREDIT AND PROVIDE A TOTAL.
  
 14. SATISFIED. PROVIDE PRELIMINARY APPROVAL FROM FDOT
 FOR THE PROPOSED STREETSCAPE.
  
 15. SATISFIED. ROYAL PALMS OR TREES AND THE REQUIRED
 PLANTING STRIP SHOULD BE PLACED IN AN EXPANDED ISLAND
 BETWEEN THE ENTRANCE AND EXIT LANES AND EAST OF THE
 ENTRANCE ON OKEECHOBEE BLVD.
  
 THE COMMENT IS REGARDING THE PLANTING STRIP REQUIRED
 ADJACENT TO THE CURB. THIS CAN BE DESIGNED TO INCLUDE
 THE PLANTINGS IN THE ENTRANCE DESIGN. THE AREAS EAST
 AND WEST OF THE DRIVEWAY AND A PART IN THE CENTER.
 ADDITIONAL COMMENTS 8/22/22:
  
 16. SATISFIED. THE AREA IN THE PLAZA DESIGNATED FOR AN
 ART PIECES MUST BE SUBTRACTED FROM THE VEGETATED AREA.
 DEPENDING ON THE SIZE OF THE BASE REQUIRED, THE
 VEGETATED AREA WILL LIKELY FALL BELOW THE REQUIRED
 SQUARE FOOTAGE.
  
 17. SATISFIED. THE ROYAL PALMS FOR THE STREETSCAPE MUST
 MEET THE MINIMUM 20 FOOT HEIGHT OVERALL. THIS WILL
 ASSURE THE FRONDS WILL NOT INTERFERE WITH TRAFFIC AT 14
 FEET HEIGHT.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH
 THIS PETITION.
  
  
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE STREETSCAPE
 LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A
 SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  

Review Stop L LANDSCAPING
Rev No 3 Status F Date 08-23-2022 Cont ID  
Sent By rcaranci Date 08-23-2022 Time 10:11 Rev Time 0.00
Received By rcaranci Date 08-23-2022 Time 10:11 Sent To  
Notes
2022-08-23 10:12:17FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: 320 LAKESIDE Z22050021
 JULY 22, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 1. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE
 TREES AND PALMS IN GOOD CONDITION TO BE PRESERVED ON
 SITE OR RELOCATED. ANSI A 300 (PART 5) STANDARDS
 SPECIFY EXAMPLES OF SUITABILITY RATINGS OF GOOD,
 MODERATE, OR POOR FOR RELOCATION. PROVIDE THE ARBORISTS
 REPORT RATING THE CONDITION AND RELOCATION POTENTIAL
 FOR THE NATIVE TREES AND PALMS, IT WAS NOT LOCATED IN
 THE SUBMITTAL. NON NATIVE TREES AND PALMS ARE NOT
 REQUIRED TO BE RELOCATED. THERE ARE 3 SABAL PALMS
 LISTED AS GOOD CONDITION THAT MUST BE RELOCATED.
  
 2. MAKE THE FOLLOWING CORRECTIONS TO THE TREE
 DISPOSITION LIST:
 ? SATISFIED. ONLY TREES PROPOSED TO BE REMOVED WITH A
 CANOPY DIAMETER OF 20 FEET OR MORE SHOULD HAVE THE
 MITIGATION SQUARE FOOTAGE CALCULATED BASED ON THE
 ACTUAL DIAMETER. TREES LESS THAN 20 FEET CANOPY
 DIAMETER AND PALMS SHOULD SHOW THE CATEGORY MITIGATION
 DUE. THE TREE CATEGORY LIST IS AVAILABLE FROM CITY
 STAFF.
 ? SATISFIED. SHOW ONE COLUMN ON THE DISPOSITION CHART
 FOR MITIGATION DUE FOR REMOVALS ONLY AND PROVIDE THE
 TOTAL SQUARE FOOTAGE.
  
 3. SATISFIED. THE DIAGRAM OF THE REQUIRED AND PROVIDED
 PUBLIC AND PRIVATE OPEN SPACE AREAS FOR OBD 25 ZONING
 DISTRICT ON SHEET LP-4 IDENTIFIES THE TYPE OF PUBLIC
 OPEN SPACE AS PLAZA AS ALLOWED BY TABLE IV-7 AND
 DEFINITIONS IN SECTION 94-109. THE PRIVATE OPEN SPACE
 AREA IS IDENTIFIED AS INTERIOR COURTYARD BUT DOES NOT
 MEET THE DEFINITION. THE OPEN SPACE TYPE SHOULD BE
 ROOFTOP GARDEN AND THE REQUIREMENTS SHOWN.
 7/21/22 MAKE THE FOLLOWING CORRECTIONS:
 ? ALL CALCULATIONS FOR PLAZA REQUIREMENTS MUST BE
 CALCULATED BASED ON THE PROVIDED AREA OF 2010 SQ FT.
 AND THE PROVIDE SHOWN THAT MEETS OR EXCEEDS THE
 REQUIRED.
 ? VEGETATED AREA OF 503 SQ FT IS REQUIRED
 ? OVERHEAD COVER MIN IS 201 SQ FT AND MAX IS MAX IS 402
 SQ FT
 ? TREE CANOPY CREDITS NEED TO BE REVISED. COCONUT PALM
 DOES NOT QUALIFY AS A LARGE PALM. CALLIANDRA WOULD BE A
 SMALL TREE FOR 150 SQ FT. CHANGE TO TREES THAT WILL
 PROVIDE THE INTENDED SHADE.
 ? FOR PRIVATE OPEN SPACE, DO NOT COUNT COCONUTS, COUNT
 ONLY 12 EAST PALATKA HOLLY AS MEETING THE 300 SQ FT
 EACH FOR TYPE 2: MEDIUM TREE FOR TOTAL 3600 SQ FT
 PROVIDED AND 2819 REQUIRED.
 ? FOR ROOFTOP GARDEN, THERE APPEARS TO BE PART OF THE
 DESIGNATED OPEN SPACE AREA COVERED BY A ROOF AREA ON
 THE SOUTH SIDE OF THE POOL THAT IS INCONSISTENT BETWEEN
 SHEETS L-4 AND LP-4.
 ? SHEET LP-2 NEEDS TO SHOW THE OUTLINE OF THE PRIVATE
 OPEN SPACE AREA.
  
 4. SATISFIED. INCLUDE A PLANT LIST OF THE TREES, SHRUBS
 AND GROUNDCOVER PROPOSED FOR EACH OPEN SPACE AREA AND
 SHOW THE CREDITS GIVEN FOR TREE CANOPY SQUARE FOOTAGE
 BASED ON TABLE IV-8.
 SEE COMMENT #3 FOR CORRECTIONS.
  
 5. SATISFIED. IDENTIFY RELOCATED TREES OR PALMS ON THE
 PLANT LIST AND COUNT THEM TOWARD THE REQUIRED TREES.
  
 6. SATISFIED. PROVIDE CALCULATIONS FOR REQUIRED STREET
 TREES AT MAXIMUM SPACING EVERY 30 FEET OR PORTION
 THEREOF FOR EACH STREETSCAPE LENGTH, AND SHOW THE
 NUMBER PROVIDED PER SECTION 94-113.
  
 7. SATISFIED. PROVIDE LOCATIONS AND DETAIL FOR THE
 REQUIRED STRUCTURAL SOIL UNDER HARDSCAPE PER SECTION
 94-113 AND PROVIDE THE TYPICAL DETAIL FOR INSTALLATION.
 THE AREA MUST BE 9 X14 FT PARALLEL TO THE CURB FOR EACH
 TREE CONSISTING OF PLANTING AREA AND/OR STRUCTURAL
 SOIL.
  
 8. SATISFIED. ROYAL PALMS SHOULD BE USED ON THE
 LAKESIDE AND OKEECHOBEE STREETSCAPES AND LIVE OAKS ON
 THE SOUTH DIXIE SIDE. STAFF RECOMMENDS ADDING SMALLER
 SHADE TREES BETWEEN THE ROYAL PALMS TO PROVIDE
 ADDITIONAL SHADE FOR THE SIDEWALKS.
  
 9. SATISFIED. STREET TREES MUST MEET THE MINIMUM HEIGHT
 OF 20 FEET AND ROYAL PALMS MUST BE AT LEAST 14 FEET OF
 GREY WOOD TO ASSURE THE FRONDS WILL MEET THE 13.5 FEET
 REQUIRED FOR STREET CLEARANCE.
  
 10. SATISFIED. SHOW ALL EXISTING AND PROPOSED WATER AND
 SEWER AND DRAINAGE LINES ON THE LANDSCAPE PLAN. SHOW
 LOCATIONS OF BACKFLOWS AND ADJUST LOCATIONS OF UTILITY
 LINES TO RESOLVE CONFLICTS WITH EXISTING AND PROPOSED
 TREES AND LANDSCAPING.
  
 11. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L.
 PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT
 MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT
 TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE
 LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH
 FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH
 FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED
 ON THE PLANT LIST.
  
 12. SATISFIED. PROVIDE SCREENING HEDGES FOR ALL GROUND
 MOUNTED VALVES AND EQUIPMENT AND ADD A NOTE THAT ALL
 EQUIPMENT WILL BE SCREENED.
 ADDITIONAL COMMENTS 7/21/22:
  
 13. SATISFIED. REVISE THE TREE MITIGATION PROVIDED
 CHART ON SHEET TD-1 TO INCLUDE ALL PALMS AND TREES ON
 THE PLANT LIST INCLUDING STREET TREES. ASSIGN THE
 CATEGORY CREDIT AND PROVIDE A TOTAL.
  
 14. SATISFIED. PROVIDE PRELIMINARY APPROVAL FROM FDOT
 FOR THE PROPOSED STREETSCAPE.
  
 15. PARTIALLY SATISFIED. ROYAL PALMS OR TREES AND THE
 REQUIRED PLANTING STRIP SHOULD BE PLACED IN AN EXPANDED
 ISLAND BETWEEN THE ENTRANCE AND EXIT LANES AND EAST OF
 THE ENTRANCE ON OKEECHOBEE BLVD.
  
 THE COMMENT IS REGARDING THE PLANTING STRIP REQUIRED
 ADJACENT TO THE CURB. THIS CAN BE DESIGNED TO INCLUDE
 THE PLANTINGS IN THE ENTRANCE DESIGN. THE AREAS EAST
 AND WEST OF THE DRIVEWAY AND A PART IN THE CENTER.
 ADDITIONAL COMMENTS 8/22/22:
  
 16. THE AREA IN THE PLAZA DESIGNATED FOR AN ART PIECES
 MUST BE SUBTRACTED FROM THE VEGETATED AREA. DEPENDING
 ON THE SIZE OF THE BASE REQUIRED, THE VEGETATED AREA
 WILL LIKELY FALL BELOW THE REQUIRED SQUARE FOOTAGE.
  
 17. THE ROYAL PALMS FOR THE STREETSCAPE MUST MEET THE
 MINIMUM 20 FOOT HEIGHT OVERALL. THIS WILL ASSURE THE
 FRONDS WILL NOT INTERFERE WITH TRAFFIC AT 14 FEET
 HEIGHT.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH
 THIS PETITION.
  
  
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE STREETSCAPE
 LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A
 SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  
  

Review Stop L LANDSCAPING
Rev No 2 Status F Date 07-21-2022 Cont ID  
Sent By rcaranci Date 07-21-2022 Time 11:23 Rev Time 0.00
Received By rcaranci Date 07-21-2022 Time 11:23 Sent To  
Notes
2022-07-21 11:23:37FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: 320 LAKESIDE Z22050021
 JULY 21, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 1. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE
 TREES AND PALMS IN GOOD CONDITION TO BE PRESERVED ON
 SITE OR RELOCATED. ANSI A 300 (PART 5) STANDARDS
 SPECIFY EXAMPLES OF SUITABILITY RATINGS OF GOOD,
 MODERATE, OR POOR FOR RELOCATION. PROVIDE THE ARBORISTS
 REPORT RATING THE CONDITION AND RELOCATION POTENTIAL
 FOR THE NATIVE TREES AND PALMS, IT WAS NOT LOCATED IN
 THE SUBMITTAL. NON NATIVE TREES AND PALMS ARE NOT
 REQUIRED TO BE RELOCATED. THERE ARE 3 SABAL PALMS
 LISTED AS GOOD CONDITION THAT MUST BE RELOCATED.
  
 2. MAKE THE FOLLOWING CORRECTIONS TO THE TREE
 DISPOSITION LIST:
 ? SATISFIED. ONLY TREES PROPOSED TO BE REMOVED WITH A
 CANOPY DIAMETER OF 20 FEET OR MORE SHOULD HAVE THE
 MITIGATION SQUARE FOOTAGE CALCULATED BASED ON THE
 ACTUAL DIAMETER. TREES LESS THAN 20 FEET CANOPY
 DIAMETER AND PALMS SHOULD SHOW THE CATEGORY MITIGATION
 DUE. THE TREE CATEGORY LIST IS AVAILABLE FROM CITY
 STAFF.
 ? SATISFIED. SHOW ONE COLUMN ON THE DISPOSITION CHART
 FOR MITIGATION DUE FOR REMOVALS ONLY AND PROVIDE THE
 TOTAL SQUARE FOOTAGE.
  
 3. PARTIALLY SATISFIED. THE DIAGRAM OF THE REQUIRED AND
 PROVIDED PUBLIC AND PRIVATE OPEN SPACE AREAS FOR OBD 25
 ZONING DISTRICT ON SHEET LP-4 IDENTIFIES THE TYPE OF
 PUBLIC OPEN SPACE AS PLAZA AS ALLOWED BY TABLE IV-7 AND
 DEFINITIONS IN SECTION 94-109. THE PRIVATE OPEN SPACE
 AREA IS IDENTIFIED AS INTERIOR COURTYARD BUT DOES NOT
 MEET THE DEFINITION. THE OPEN SPACE TYPE SHOULD BE
 ROOFTOP GARDEN AND THE REQUIREMENTS SHOWN.
 7/21/22 MAKE THE FOLLOWING CORRECTIONS:
 ? ALL CALCULATIONS FOR PLAZA REQUIREMENTS MUST BE
 CALCULATED BASED ON THE PROVIDED AREA OF 2010 SQ FT.
 AND THE PROVIDE SHOWN THAT MEETS OR EXCEEDS THE
 REQUIRED.
 ? VEGETATED AREA OF 503 SQ FT IS REQUIRED
 ? OVERHEAD COVER MIN IS 201 SQ FT AND MAX IS MAX IS 402
 SQ FT
 ? TREE CANOPY CREDITS NEED TO BE REVISED. COCONUT PALM
 DOES NOT QUALIFY AS A LARGE PALM. CALLIANDRA WOULD BE A
 SMALL TREE FOR 150 SQ FT. CHANGE TO TREES THAT WILL
 PROVIDE THE INTENDED SHADE.
 ? FOR PRIVATE OPEN SPACE, DO NOT COUNT COCONUTS, COUNT
 ONLY 12 EAST PALATKA HOLLY AS MEETING THE 300 SQ FT
 EACH FOR TYPE 2: MEDIUM TREE FOR TOTAL 3600 SQ FT
 PROVIDED AND 2819 REQUIRED.
 ? FOR ROOFTOP GARDEN, THERE APPEARS TO BE PART OF THE
 DESIGNATED OPEN SPACE AREA COVERED BY A ROOF AREA ON
 THE SOUTH SIDE OF THE POOL THAT IS INCONSISTENT BETWEEN
 SHEETS L-4 AND LP-4.
 ? SHEET LP-2 NEEDS TO SHOW THE OUTLINE OF THE PRIVATE
 OPEN SPACE AREA.
  
 4. PARTIALLY SATISFIED. INCLUDE A PLANT LIST OF THE
 TREES, SHRUBS AND GROUNDCOVER PROPOSED FOR EACH OPEN
 SPACE AREA AND SHOW THE CREDITS GIVEN FOR TREE CANOPY
 SQUARE FOOTAGE BASED ON TABLE IV-8.
 SEE COMMENT #3 FOR CORRECTIONS.
  
 5. SATISFIED. IDENTIFY RELOCATED TREES OR PALMS ON THE
 PLANT LIST AND COUNT THEM TOWARD THE REQUIRED TREES.
  
 6. SATISFIED. PROVIDE CALCULATIONS FOR REQUIRED STREET
 TREES AT MAXIMUM SPACING EVERY 30 FEET OR PORTION
 THEREOF FOR EACH STREETSCAPE LENGTH, AND SHOW THE
 NUMBER PROVIDED PER SECTION 94-113.
  
 7. SATISFIED. PROVIDE LOCATIONS AND DETAIL FOR THE
 REQUIRED STRUCTURAL SOIL UNDER HARDSCAPE PER SECTION
 94-113 AND PROVIDE THE TYPICAL DETAIL FOR INSTALLATION.
 THE AREA MUST BE 9 X14 FT PARALLEL TO THE CURB FOR EACH
 TREE CONSISTING OF PLANTING AREA AND/OR STRUCTURAL
 SOIL.
  
 8. SATISFIED. ROYAL PALMS SHOULD BE USED ON THE
 LAKESIDE AND OKEECHOBEE STREETSCAPES AND LIVE OAKS ON
 THE SOUTH DIXIE SIDE. STAFF RECOMMENDS ADDING SMALLER
 SHADE TREES BETWEEN THE ROYAL PALMS TO PROVIDE
 ADDITIONAL SHADE FOR THE SIDEWALKS.
  
 9. SATISFIED. STREET TREES MUST MEET THE MINIMUM HEIGHT
 OF 20 FEET AND ROYAL PALMS MUST BE AT LEAST 14 FEET OF
 GREY WOOD TO ASSURE THE FRONDS WILL MEET THE 13.5 FEET
 REQUIRED FOR STREET CLEARANCE.
  
 10. SATISFIED. SHOW ALL EXISTING AND PROPOSED WATER AND
 SEWER AND DRAINAGE LINES ON THE LANDSCAPE PLAN. SHOW
 LOCATIONS OF BACKFLOWS AND ADJUST LOCATIONS OF UTILITY
 LINES TO RESOLVE CONFLICTS WITH EXISTING AND PROPOSED
 TREES AND LANDSCAPING.
  
 11. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L.
 PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT
 MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT
 TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE
 LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH
 FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH
 FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED
 ON THE PLANT LIST.
  
 12. SATISFIED. PROVIDE SCREENING HEDGES FOR ALL GROUND
 MOUNTED VALVES AND EQUIPMENT AND ADD A NOTE THAT ALL
 EQUIPMENT WILL BE SCREENED.
 ADDITIONAL COMMENTS 7/21/22:
  
 13. REVISE THE TREE MITIGATION PROVIDED CHART ON SHEET
 TD-1 TO INCLUDE ALL PALMS AND TREES ON THE PLANT LIST
 INCLUDING STREET TREES. ASSIGN THE CATEGORY CREDIT AND
 PROVIDE A TOTAL.
  
 14. PROVIDE PRELIMINARY APPROVAL FROM FDOT FOR THE
 PROPOSED STREETSCAPE.
  
 15. ROYAL PALMS OR TREES AND THE REQUIRED PLANTING
 STRIP SHOULD BE PLACED IN AN EXPANDED ISLAND BETWEEN
 THE ENTRANCE AND EXIT LANES AND EAST OF THE ENTRANCE ON
 OKEECHOBEE BLVD.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH
 THIS PETITION.
  
  
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE STREETSCAPE
 LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A
 SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  

Review Stop L LANDSCAPING
Rev No 1 Status F Date 06-07-2022 Cont ID  
Sent By rcaranci Date 06-07-2022 Time 16:48 Rev Time 0.00
Received By rcaranci Date 06-07-2022 Time 16:48 Sent To  
Notes
2022-06-07 16:48:24FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: 320 LAKESIDE Z22050021
 JUNE 7, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 1. SECTION 94-448 (D)(3) REQUIRES NATIVE TREES AND
 PALMS IN GOOD CONDITION TO BE PRESERVED ON SITE OR
 RELOCATED. ANSI A 300 (PART 5) STANDARDS SPECIFY
 EXAMPLES OF SUITABILITY RATINGS OF GOOD, MODERATE, OR
 POOR FOR RELOCATION. PROVIDE THE ARBORISTS REPORT
 RATING THE CONDITION AND RELOCATION POTENTIAL FOR THE
 NATIVE TREES AND PALMS, IT WAS NOT LOCATED IN THE
 SUBMITTAL. NON NATIVE TREES AND PALMS ARE NOT REQUIRED
 TO BE RELOCATED. THERE ARE 3 SABAL PALMS LISTED AS GOOD
 CONDITION THAT MUST BE RELOCATED.
  
 2. MAKE THE FOLLOWING CORRECTIONS TO THE TREE
 DISPOSITION LIST:
 ? ONLY TREES PROPOSED TO BE REMOVED WITH A CANOPY
 DIAMETER OF 20 FEET OR MORE SHOULD HAVE THE MITIGATION
 SQUARE FOOTAGE CALCULATED BASED ON THE ACTUAL DIAMETER.
 TREES LESS THAN 20 FEET CANOPY DIAMETER AND PALMS
 SHOULD SHOW THE CATEGORY MITIGATION DUE. THE TREE
 CATEGORY LIST IS AVAILABLE FROM CITY STAFF.
 ? SHOW ONE COLUMN ON THE DISPOSITION CHART FOR
 MITIGATION DUE FOR REMOVALS ONLY AND PROVIDE THE TOTAL
 SQUARE FOOTAGE.
  
 3. THE DIAGRAM OF THE REQUIRED AND PROVIDED PUBLIC AND
 PRIVATE OPEN SPACE AREAS FOR OBD 25 ZONING DISTRICT ON
 SHEET LP-4 IDENTIFIES THE TYPE OF PUBLIC OPEN SPACE AS
 PLAZA AS ALLOWED BY TABLE IV-7 AND DEFINITIONS IN
 SECTION 94-109. THE PRIVATE OPEN SPACE AREA IS
 IDENTIFIED AS INTERIOR COURTYARD BUT DOES NOT MEET THE
 DEFINITION. THE OPEN SPACE TYPE SHOULD BE ROOFTOP
 GARDEN AND THE REQUIREMENTS SHOWN.
  
 4. INCLUDE A PLANT LIST OF THE TREES, SHRUBS AND
 GROUNDCOVER PROPOSED FOR EACH OPEN SPACE AREA AND SHOW
 THE CREDITS GIVEN FOR TREE CANOPY SQUARE FOOTAGE BASED
 ON TABLE IV-8.
  
 5. IDENTIFY RELOCATED TREES OR PALMS ON THE PLANT LIST
 AND COUNT THEM TOWARD THE REQUIRED TREES.
  
 6. PROVIDE CALCULATIONS FOR REQUIRED STREET TREES AT
 MAXIMUM SPACING EVERY 30 FEET OR PORTION THEREOF FOR
 EACH STREETSCAPE LENGTH, AND SHOW THE NUMBER PROVIDED
 PER SECTION 94-113.
  
 7. PROVIDE LOCATIONS AND DETAIL FOR THE REQUIRED
 STRUCTURAL SOIL UNDER HARDSCAPE PER SECTION 94-113 AND
 PROVIDE THE TYPICAL DETAIL FOR INSTALLATION. THE AREA
 MUST BE 9 X14 FT PARALLEL TO THE CURB FOR EACH TREE
 CONSISTING OF PLANTING AREA AND/OR STRUCTURAL SOIL.
  
 8. ROYAL PALMS SHOULD BE USED ON THE LAKESIDE AND
 OKEECHOBEE STREETSCAPES AND LIVE OAKS ON THE SOUTH
 DIXIE SIDE. STAFF RECOMMENDS ADDING SMALLER SHADE TREES
 BETWEEN THE ROYAL PALMS TO PROVIDE ADDITIONAL SHADE FOR
 THE SIDEWALKS.
  
 9. STREET TREES MUST MEET THE MINIMUM HEIGHT OF 20 FEET
 AND ROYAL PALMS MUST BE AT LEAST 14 FEET OF GREY WOOD
 TO ASSURE THE FRONDS WILL MEET THE 13.5 FEET REQUIRED
 FOR STREET CLEARANCE.
  
 10. SHOW ALL EXISTING AND PROPOSED WATER AND SEWER AND
 DRAINAGE LINES ON THE LANDSCAPE PLAN. SHOW LOCATIONS OF
 BACKFLOWS AND ADJUST LOCATIONS OF UTILITY LINES TO
 RESOLVE CONFLICTS WITH EXISTING AND PROPOSED TREES AND
 LANDSCAPING.
  
 11. SHOW COMPLIANCE WITH SECTION 94-445 L. PLANT
 SPECIES. A MINIMUM OF 60 PERCENT OF PLANT MATERIAL
 ADDED SHALL BE FLORIDA NATIVE OR DROUGHT TOLERANT
 SPECIES SELECTED FROM THE CITY LIST OR THE LIST OF
 SPECIES IN THE MOST RECENT EDITION OF SOUTH FLORIDA
 WATER MANAGEMENT DISTRICT WATERWISE SOUTH FLORIDA
 LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED ON THE
 PLANT LIST.
  
 12. PROVIDE SCREENING HEDGES FOR ALL GROUND MOUNTED
 VALVES AND EQUIPMENT AND ADD A NOTE THAT ALL EQUIPMENT
 WILL BE SCREENED.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH
 THIS PETITION.
  
  
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE STREETSCAPE
 LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A
 SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  
  

Review Stop PU PUBLIC UTILITIES
Rev No 3 Status P Date 10-11-2022 Cont ID  
Sent By mtechnow Date 10-11-2022 Time 13:29 Rev Time 0.00
Received By mtechnow Date 10-11-2022 Time 13:29 Sent To  
Notes
***NONE***

Review Stop PU PUBLIC UTILITIES
Rev No 2 Status F Date 07-14-2022 Cont ID  
Sent By mtechnow Date 07-14-2022 Time 17:12 Rev Time 0.00
Received By mtechnow Date 07-14-2022 Time 16:52 Sent To  
Notes
2022-07-14 17:00:13-CALL OUT POINT OF SERVICE AND SHOW THE UTILITY LINES
 WITHIN THE PROPERTY AS PRIVATE WHERE APPLICABLE.
 -ON DEMO SHEET ADD NOTE TO "CUT AND CAP AT THE MAIN"
 FOR ALL EXISTING WATER SERVICES AND SANITARY LATERALS
 TO BE ABANDONED.
 - PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM
 AND PEAK) AND FIRE FLOW DEMANDS ON PLAN SHEET.
 CALCULATIONS SHALL BE PER FAC 64E-6 FOR SEWER AND PER
 FAC 64-E.008 FOR WATER.
 -SHOW STATIONING AND HORIZONTAL SEPARATION CLEARANCE
 BETWEEN PROPOSED UTILITIES AND EXISTING UTILITIES
 AND/OR BASELINE.
  

Review Stop PU PUBLIC UTILITIES
Rev No 1 Status F Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By mtechnow Date 06-07-2022 Time 16:40 Sent To  
Notes
2022-06-07 16:42:43-PER VINCE NOEL'S COMMENTS WILL WAIT FOR REDESIGNED
 PLANS.
  
 MIKE TECHNOW - [email protected]

Review Stop PU-CS PUBLIC UTILITIES CUSTOMER SRVC
Rev No 4 Status P Date 09-23-2022 Cont ID  
Sent By mhurley Date 09-23-2022 Time 16:06 Rev Time 0.00
Received By mhurley Date   Time   Sent To  
Notes
***NONE***

Review Stop PU-CS PUBLIC UTILITIES CUSTOMER SRVC
Rev No 3 Status F Date 08-16-2022 Cont ID  
Sent By mhurley Date 08-16-2022 Time 15:22 Rev Time 0.00
Received By mhurley Date   Time   Sent To  
Notes
2022-08-16 15:22:12PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING:
  
 -NOT SATISFIED WITH RESPONSE TO REVIEW COMMENT NUMBER 4
 IN LETTER DATED 12AUG2022. BACKFLOW ASSEMBLY LOCATIONS
 ARE NOT ACCEPTABLE. THE MOST CONCERNING IS THE LONG
 DISTANCE FROM THE METERS, POINT OF SERVICE, AND
 PROPERTY LINES. NEED DISTANCE REDUCED SUBSTANTIALLY ON
 THEM.
  
 -PAVEMENT RESTORATION BOUNDARIES IN RIGHT OF WAY MAY
 STILL BE SMALLER THAN REQUIRED. WILL REVIEW FURTHER AT
 ENGINEERING DEVELOPMENT SUBMITTAL.
  
 -WILL REVIEW CUT AND CAP LOCATIONS AT ENGINEERING
 DEVELOPMENT SUBMITTAL. MAY HAVE TO CUT BACK FURTHER
 THAN PROPOSED.
  
 -AS REQUESTED IN RESPONSE FOR REVIEW COMMENT NUMBER 9
 IN LETTER DATED 12AUG2022, MORE INFO ABOUT DIMENSIONS
 AND FOOTPRINT OF LARGE METERED WATER SERVICES CAN BE
 FOUND IN WPB STANDARD DETAILS WS4, WS4.1, AND AWWA M6
 MANUAL PG 49 TABLE 4 DASH 1.
  
 -ENSURE THAT ANY LIGHT POSTS IN LT1 ARE LOCATED MINIMUM
 3 FEET AWAY FROM UTILITIES SUCH AS WATER METER BOXES.
  
 RESPECTFULLY,
  
 MARK HURLEY
 [email protected]
  

Review Stop PU-CS PUBLIC UTILITIES CUSTOMER SRVC
Rev No 2 Status F Date 07-14-2022 Cont ID  
Sent By mhurley Date 07-14-2022 Time 11:08 Rev Time 0.00
Received By mhurley Date   Time   Sent To  
Notes
2022-07-14 11:08:00-STILL COULD NOT FIND VISUAL BOUNDARIES OF PAVEMENT
 RESTORATION ON THE ADJACENT ROADWAYS WHERE UTILITY
 EXCAVATION IS PROPOSED. PLEASE MAKE SURE COMPLIES WITH
 OVERSEEING AGENCY REQUIREMENTS AND SHOW ON CIVIL PLANS.
 -THERE ARE STILL MANY UNACCOUNTED FOR UTILITIES SUCH AS
 METERED WATER SERVICES AND SEWER LATERALS WHERE REMOVAL
 IS NOT SHOWN ON DEMO OR UTILITY PLANS. WILL LIKELY NEED
 TO GO INTO DIXIE HWY FOR SOME OF THAT REMOVAL.
 -COULD NOT FIND THE WORDING ABOVE GROUND ON LABELS FOR
 PROPOSED 3 INCH AND LARGER WATER METERS. PLEASE ADD TO
 CIVIL PLANS. SHEET C300 SHOWS AT LEAST THREE SUCH
 METERS.
 -BACKFLOW LOCATIONS ARE NOT ACCEPTABLE. THE MOST
 CONCERNING IS THE LONG DISTANCE FROM THE METERS, POINTS
 OF SERVICE, AND PROPERTY LINES. NEED DISTANCE REDUCED
 SUBSTANTIALLY ON THEM.
 -IF FIRE HYDRANT NEAR NORTH PROPERTY LINE IS NOT
 EXISTING, ADD WORDING PROPOSED ON LABEL. IF PROPOSED IT
 DOES NOT SEEM TO MEET REQUIREMENTS OF NOTE 3 ON WPB
 STANDARD DETAIL P8.
 -320 LAKEVIEW AVE IS LISTED IN UTILITY BILLING SYSTEM
 AS HAVING EXISTING 6 INCH FIRELINE. SHOW AND LABEL ON
 CIVIL PLANS.
 -WILL 3 X 10 FPLE IN FAR NE CORNER OF PROPERTY REMAIN?
 -PLEASE ADD VISUAL GRAPHIC MEASUREMENT SCALES TO
 ENLARGEMENTS ON SHEET C300.
 -FOOTPRINTS OF THE 3 AND 4 INCH METERED WATER SERVICES
 ARE LIKELY MUCH LARGER THAN SHOWN ON SHEET C300.
 REFERENCE WPB SD WS3 FOR SOME UNDERSTANDING OF
 DIMENSIONS.
 -ANY PROPOSED CHANGES TO CITY WPB STREET LIGHTING OR
 IRRIGATION ELECTRIC PANELS REQUIRES SEPARATE APPROVAL.
 -APPLICANT SHOULD BE AWARE THAT THERE ARE OVERHEAD
 UTILITIES RUNNING FROM PROPERTY SOUTH ACROSS
 OKEECHOBEE.
 -ARE THE STREET LIGHTS AT NORTH AND SOUTH SIDES OF
 PROPERTY INTENDED TO REMAIN?
 -WILL THE BIKE RACKS AND STREET FURNITURE SHOWN ON LH1
 PREVENT OR IMPEDE USE OF THE PROPOSED SIDEWALKS? ON
 A1.01 THEY LOOK FINE SO PLEASE ALSO MAKE SURE PLAN
 LOCATIONS MATCH.
 -PROPOSED WATER SERVICE DESIGNS ARE NONSTANDARD AND MAY
 NEED ADJUSTMENT UPON FURTHER REVIEW AT ENGINEERING
 DEVELOPMENT SUBMITTAL. FURTHERMORE THE PROPOSED
 LOCATIONS OF THE WATER SERVICES MAY CONFLICT WITH OTHER
 PROJECT ELEMENTS. RECOMMEND FURTHER REFINEMENT OF WATER
 SERVICES DURING PPRC TO PREVENT FUTURE PROBLEMS. CAN
 CONTACT [email protected] FOR SOME ASSISTANCE OR
 GUIDANCE.
 -SHEETS C102 AND C103 SHOWS TRUCKS ENTERING NORTH
 ENTRANCE FROM THE EAST, BUT IT WOULD SEEM THAT MOST
 TRUCKS WOULD ORIGINATE FROM THE WEST NEAR I95 TRAVELING
 EAST. IS THE INTENT FOR TRUCKS TO GO AROUND THE BLOCK
 FIRST, AND IF SO, HOW WILL THEY KNOW TO DO THAT BEFORE
 TURNING INTO SOUTHERN ENTRANCE?
 -SHEET C104 REFUSE TRUCK SIDE LOOKS LIKE A SMALL CAR
 WAS USED FOR DIAGRAM INSTEAD OF A LARGER REFUSE TRUCK.
  

Review Stop PU-CS PUBLIC UTILITIES CUSTOMER SRVC
Rev No 1 Status F Date 06-08-2022 Cont ID  
Sent By mhurley Date 06-08-2022 Time 13:56 Rev Time 0.00
Received By mhurley Date 06-08-2022 Time 13:55 Sent To  
Notes
2022-06-08 13:56:11-VERTICAL BACKFLOW ASSEMBLIES ARE NONSTANDARD AND
 SUBJECT TO FURTHER REVIEW AT FORMAL ENGINEERING
 SUBMITTAL.
  
 -WHAT IS THE CLEARANCE DISTANCE BETWEEN PROPOSED
 EASTERN BUILDING WALLS AND EXISTING BUILDING WALLS OF
 801 S. OLIVE?
  
 -WHAT IS HAPPENING TO THE EXISTING BELLSOUTH AND
 INGRESS EGRESS EASEMENTS? IF THEY ARE REMAINING, VERIFY
 APPLICANT HAS APPROVAL TO BUILD STRUCTURES IN THEM.
  
 -COULD NOT FIND GREASE TRAP FOR CAF? AND RESTAURANT ON
 ENGINEERING PLAN. WHERE WILL THEY BE LOCATED?
  
 -WATER UTILITY DESIGN IS NOT ACCEPTABLE. NEED DOMESTIC
 METER OUTSIDE BUILDING FOOTPRINT AND CLOSE TO PROPERTY
 LINE. CITY WATER MAIN SHOULD NOT TRAVERSE PROPERTY AND
 BE UNDER A BUILDING.
  
 -PAVEMENT RESTORATION OF OKEECHOBEE AND LAKEVIEW ARE
 NOT SHOWN.
  
 -SHOW EXISTING UTILITIES AND LABEL WHAT IS HAPPENING TO
 THEM.
  
 -VERIFY EXISTING SEWER MAIN SIZING IS SUFFICIENT.
  
 -WPB GIS SAYS SOME EXISTING SEWER MAINS IN AREA ARE
 OLDER. APPLICANT MAY BE REQUIRED TO IMPROVE THEM AS
 ADVISED BY CITY OR ENGINEER OF RECORD.
  
 -DOMESTIC WATER METER NEEDS TO BE INSTALLED ABOVE
 GROUND PER STANDARD DETAIL WS3 IF SIZED 3 INCH OR
 LARGER. SHOW AND LABEL IT ON ENGINEERING PLAN.
  
 -DOMESTIC RPZ NEEDS TO BE OUTSIDE BUILDING, AND CLOSE
 TO PROPERTY LINE AND DOMESTIC WATER METER.
  
 -ADD STANDARD DETAIL P8 TO ENGINEERING PLAN SET, AND
 VERIFY PROPOSED FIRE HYDRANT LOCATION MEETS
 REQUIREMENTS OF P8.
  
 -CANNOT READ NUMBER UNITS ON VISUAL SCALE MEASUREMENT
 ICON ON UTILITY PLAN. PLEASE MAKE READABLE.
  
 -ADD STANDARD DETAIL WS3 TO ENGINEERING PLAN SET.
  
 -SHOW AND LABEL ANY EXISTING OR PROPOSED EASEMENTS
 INCLUDING SIDEWALK EASEMENTS AND UTILITY EASEMENTS.
  
 -JUSTIFICATION STATEMENT STATED: HOWEVER, THE INTERIOR
 CEILING AND EXTERIOR PILASTERS CURRENTLY A PART OF THE
 BUILDING AT 320 LAKEVIEW WILL BE PRESERVED AND REUSED
 IN THE DESIGN OF THE GROUND FLOOR COMMERCIAL SPACE AS
 DISCUSSED WITH FRIEDERIKE MITTNER, CITY HISTORIC
 PRESERVATION PLANNER. PLEASE ADD THAT NOTE TO
 DEMOLITION PLAN AND SHOW WHERE THOSE ARE LOCATED.
  
 -ENSURE THAT THE CIVIL PLANS, LANDSCAPING PLANS, AND
 ARCHITECTURE PLANS MATCH WITH REGARDS TO GENERAL DESIGN
 LAYOUT. THE HARDSCAPE AND LANDSCAPE AREAS NEAR THE
 PROPERTY LINES SEEM DIFFERENT.
  

Review Stop PW PUBLIC WORKS
Rev No 4 Status P Date 09-26-2022 Cont ID  
Sent By   Date 09-26-2022 Time   Rev Time 0.00
Received By   Date 09-26-2022 Time   Sent To  
Notes
2022-09-26 15:03:42CONDITION OF APPROVAL: THE ROLL OUT CONTAINERS SHALL BE
 FRONT LOAD TYPE IN ORDER TO BE COMPATIBLE WITH THE
 CITY`S REFUSE COLLECTION VEHICLES.
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
  

Review Stop PW PUBLIC WORKS
Rev No 3 Status F Date 09-01-2022 Cont ID  
Sent By   Date 09-01-2022 Time   Rev Time 0.00
Received By   Date 09-01-2022 Time   Sent To  
Notes
2022-09-01 10:28:40PLEASE PROVIDE THE FOLLOWINGS:
 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID
 WASTE VOLUME PRODUCED ALONG WITH THE SIZE, TYPE AND
 QUANTITY OF THE CONTAINER (I.E. DUMPSTER/COMPACTOR)
 THAT WILL BE UTILIZED FOR THE SANITATION SERVICE.
 2- STAGING/LOADING AREA HEIGHT CLEARANCE SHALL BE 25 FT
 OR THE CONTAINERS SHALL BE ROLLED TO TO THE CURBSIDE
 FOR SERVICE; THE STAGING AREA FOR ROLLOUT CONTAINERS TO
 BE DETERMINED BY DEPARTMENT OF PUBLIC WORKS.
  
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045

Review Stop PW PUBLIC WORKS
Rev No 2 Status F Date 07-15-2022 Cont ID  
Sent By   Date 07-15-2022 Time   Rev Time 0.00
Received By   Date 07-15-2022 Time   Sent To  
Notes
2022-07-15 11:21:48PLEASE PROVIDE THE FOLLOWINGS:
 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID
 WASTE VOLUME PRODUCED ALONG WITH THE SIZE, TYPE AND
 QUANTITY OF THE CONTAINER (I.E. DUMPSTER/COMPACTOR)
 THAT WILL BE UTILIZED FOR THE SANITATION SERVICE.
 2- STAGING/LOADING AREA HEIGHT CLEARANCE SHALL BE 25 FT
 OR THE CONTAINERS SHALL BE ROLLED TO TO THE CURBSIDE
 FOR SERVICE; THE STAGING AREA FOR ROLLOUT CONTAINERS TO
 BE DETERMINED BY DEPARTMENT OF PUBLIC WORKS.
 3- CONTINGENCY PLAN, FOR WHEN THE COMPACTOR IS OUT OF
 SERVICE (I.E. CITY DUMPSTER, ROLL-OFF CONTAINER)
 4- DESIGNATED LOCATION FOR THE BULK ITEM PICK UP AND
 RECYCLING CONTAINERS
 5- IN CASE OF PROPOSING ADDITION OF ANY NEW CAN(S) IN
 THE CITY`S RIGHT-OF-WAY , THE LOCATION AND QUANTITY OF
 THE CAN(S) SHALL BE REVIEWED AND APPROVED BY PUBLIC
 WORKS DEPARTMENT AND THE CAN(S) SHALL BE TYPE, SIZE AND
 COLOR APPROVED BY PUBLIC WORKS DEPARTMENT. THE BUILDING
 MAINTENANCE IS RESPONSIBLE TO MAINTAIN AND SERVICE THE
 CAN(S).
 6- ALL THE PARKING STALL PAINTING SHALL COMPLY WITH THE
 CITY`S MUNICIPAL CODE SECTION 94-485 AND FLORIDA
 STATUES [553.5041 F.S.].
 7- ALL STRIPING AND SIGNAGE SHALL MEET THE M.U.T.C.D.
 LATEST EDITION.
 ALL PAVEMENT MARKING AND SIGNING DAMAGED DURING
 CONSTRUCTION SHALL BE RESTORED.
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045

Review Stop PW PUBLIC WORKS
Rev No 1 Status F Date 06-06-2022 Cont ID  
Sent By   Date 06-06-2022 Time   Rev Time 0.00
Received By   Date 06-06-2022 Time   Sent To  
Notes
2022-06-06 09:45:19PLEASE PROVIDE THE FOLLOWINGS:
 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID
 WASTE VOLUME PRODUCED ALONG WITH THE SIZE, TYPE AND
 QUANTITY OF THE CONTAINER (I.E. DUMPSTER/COMPACTOR)
 THAT WILL BE UTILIZED FOR THE SANITATION SERVICE.
 2- STAGING/LOADING AREA HEIGHT CLEARANCE FOR THE
 COMPACTORS` ROLL OUT CONTAINERS TO BE SERVICED BY THE
 FRONT LOAD SANITATION COLLECTION TRUCK.
 3-TRASH HOLDING ROOM DETAIL ALONG WITH THE TRASH
 COMPACTOR(S) UNIT SPECS.
 4- CONTINGENCY PLAN, FOR WHEN THE COMPACTOR IS OUT OF
 SERVICE (I.E. CITY DUMPSTER, ROLL-OFF CONTAINER)
 5- DESIGNATED LOCATION FOR THE BULK ITEM PICK UP AND
 RECYCLING CONTAINERS
 6- OWNERS AND/OR OCCUPANTS OF PROPERTY THAT REQUIRE
 GREASE HAULING SERVICES SHALL ENSURE THAT THEIR GREASE
 TANKS OR CONTAINERS REMAIN CLEAN, AND ARE ENCLOSED AND
 NOT IN PUBLIC VIEW.
 7- IN CASE OF PROPOSING ADDITION OF ANY NEW CAN(S) IN
 THE CITY`S RIGHT-OF-WAY , THE LOCATION AND QUANTITY OF
 THE CAN(S) SHALL BE REVIEWED AND APPROVED BY PUBLIC
 WORKS DEPARTMENT AND THE CAN(S) SHALL BE TYPE, SIZE AND
 COLOR APPROVED BY PUBLIC WORKS DEPARTMENT. THE BUILDING
 MAINTENANCE IS RESPONSIBLE TO MAINTAIN AND SERVICE THE
 CAN(S).
  
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045
  

Review Stop STORM STORMWATER
Rev No 3 Status P Date 10-04-2022 Cont ID  
Sent By tward Date 09-29-2022 Time 15:58 Rev Time 0.00
Received By tward Date 10-04-2022 Time 09:34 Sent To  
Notes
2022-09-29 16:00:36CONDITIONS FOR SITE PLAN APPROVAL ARE LISTED AT THE
 END.
  
 THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 9/23/2022 SUBMITTAL:
  
 3. [PARTIALLY SATISFIED] PROVIDE A TRENCH DRAIN ALONG
 THE WEST PROPERTY LINE TO INTERCEPT RUNOFF. ADDITIONAL
 COMMENTS: LANDSCAPE AREA SHOULD BE GRADED TO STORE
 RUNOFF (SWALE SECTION). PUBLIC OPEN SPACE AND SIDEWALK
 SHOULD BE GRADED TO DRAIN TO DS-04 AND DS-05. DS-04
 SHOULD BE IN A DEPRESSION TO COLLECT THE RUNOFF FROM
 THE OPEN SPACE AREA.
  
 5. [SATISFIED] PROVIDE CROSS SECTIONS FROM CENTERLINE
 OF RIGHTS OF WAY TO FACE OF BUILDING. SHOW BREAK
 POINTS, DISTANCES FROM BACK OF CURB TO PROPERTY LINE,
 FROM PROPERTY LINE TO FACE OF BUILDING, WIDTH OF
 SIDEWALK, CURB, ETC. LABEL THE RIGHT OF WAY (OKEECHOBEE
 BLVD, LAKEVIEW AVE, S. DIXIE HWY). ADDITIONAL COMMENTS:
 THE CROSS SECTIONS WILL SHOW HOW THE SIDEWALK AREAS AND
 DRIVEWAY APRONS WILL BE GRADED TO MEET A.D.A. CRITERIA.
 THE CONTOURING ON THE PAVING AND GRADING PLAN APPEAR TO
 RESULT IN SIDEWALK CROSS SLOPES STEEPER THAN 2%.
  
 6. [SATISFIED] PROVIDE EXISTING SPOT GRADES ALONG EDGES
 OF PAVEMENT. ADDITIONAL COMMENT: WHERE DID THE EXISTING
 SPOT GRADES COME FROM? THEY DO NOT APPEAR ON THE
 SURVEY.
  
 7. [PARTIALLY SATISFIED] PROVIDE PROPOSED FINISHED
 FLOOR ELEVATION. ADDITIONAL COMMENT: PROVIDE THE FFE'S
 ON THE CIVIL PLANS.
  
 8. [PARTIALLY SATISFIED] PROVIDE A DETAIL FOR THE
 EXFILTRATION TRENCH. LABEL THE WIDTH AND ELEVATIONS OF
 THE TOP AND BOTTOM OF THE TRENCH. ADDITIONAL COMMENT:
 REQUESTED INFORMATION CAN BE PROVIDED WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
 9. [NOT SATISFIED] PROVIDE A DETAIL FOR THE CONTROL
 STRUCTURE. THE CITY DOES NOT ALLOW THE USE OF BLEEDERS
 WITH EXFILTRATION TRENCH SYSTEMS. ADDITIONAL COMMENT:
 CONTROL STRUCTURE DETAIL CAN BE PROVIDED WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
 10. [SATISFIED] MINIMUM DIAMETER OF STORM PIPE TO BE
 INSTALLED IN THE RIGHT OF WAY IS 15 INCH RCP.
 ADDITIONAL COMMENT: PVC PIPE FROM DS-04 SHOULD BE RCP.
  
 NEW COMMENTS (7-5-2022 SUBMTITAL):
  
 11. [SATISFIED] CONTOURING OF SIDEWALK APPEARS TO
 RESULT IN CROSS SLOPES STEEPER THAN 2%.
  
 12. [PARTIALLY SATISFIED] REPLACE ALL DROP CURB OF
 EXISTING DRIVEWAYS WITH TYPE F CURB AND GUTTER.
 ADDITIONAL COMMENT: REPLACE THREE SECTIONS OF DROP CURB
 ON S. DIXIE HWY AND ONE SECTION OF DROP CURB ON
 OKEECHOBEE BLVD WITH TYPE F C&G. LABEL ALL NEW C & G ON
 THE PAVING AND GRADING PLAN.
  
 13. [PARTIALLY SATISFIED] INCLUDE IN THE LEGEND OF THE
 PAVING AND GRADING PLAN THE SPOT GRADE SYMBOLS AND
 CONTOUR LINE SYMBOL. USE A DIFFERENT SYMBOL FOR
 EXISTING SPOT GRADES. ADDITIONAL COMMENT: SAME SYMBOLS
 WERE USED FOR PROPOSED AND EXISTING SPOT GRADES.
  
 14. [SATISFIED] SHOW AND LABEL THE DRAINAGE CONTROL
 STRUCTURE.
  
 15. [PARTIALLY SATISFIED] INDICATE HOW WATER QUALITY
 TREATMENT WILL BE PROVIDED FOR THE RUNOFF FROM THE
 NORTHWEST CORNER OF THE SITE (DRAINING TO DS-04 AND
 DS-05). ADDITIONAL COMMENT ??? SEE NEW COMMENT #22
 BELOW.
  
 16. [SATISFIED] ENSURE THERE IS ADEQUATE VERTICAL
 CLEARANCE WITHIN THE BUILDING TO BE ABLE TO SERVICE THE
 EXFILTRATION TRENCHES AND DRAINAGE STRUCTURES AND TO BE
 ABLE TO REPLACE THE EXFILTRATION TRENCHES WHEN THEY ARE
 NO LONGER FUNCTIONING AS INTENDED.
  
 17. [SATISFIED] CONSIDER INCORPORATING LOW IMPACT
 DEVELOPMENT DRAINAGE SYSTEMS IN LIEU OR IN ADDITION TO
 THE EXFILTRATION TRENCHES.
  
 18. [SATISFIED] REFERENCE FDOT STANDARD PLAN NUMBERS
 INSTEAD OF FDOT STANDARD INDEX NUMBERS.
  
 NEW COMMENTS (SINCE 7-5-22 SUBMITTAL)
 19. SECTION A-A
 A. SHOW SWALE SECTION IN THE LANDSCAPE BED.
  
 20. SECTION B-B
 A. SHOW SWALE SECTIONS IN THE LANDSCAPE BEDS.
  
 21. SECTION C-C
 A. LABEL R/W AS S. DIXIE HWY.
 B. SHOW SHALLOW SWALE BETWEEN PROPERTY LINE AND
 BUILDING THAT WILL DIRECT SURFACE RUNOFF TO STRUCTURES
 DS-5 AND DS-6.
 C. SHOW SWALE SECTION IN THE LANDSCAPE BED TO COLLECT
 AND STORE STORMWATER RUNOFF.
  
 22. EXFILTRATION TRENCH IS NOT LABELED BETWEEN
 STRUCTURES DS-5 AND DS-6. EXPLAIN HOW THIS TRENCH WILL
 BE SURCHARGED.
  
 23. CONFIRM PIPE AND EXFILTRATION TRENCH LENGTHS
 BETWEEN STRUCTURES DS-01 AND DS-02 AND BETWEEN DS-02
 AND DS-03.
  
 24. SHOW WHERE ROOF DRAINS WILL CONNECT TO THE DRAINAGE
 SYSTEM.
  
 25. THE TWO PAVER AREAS ALONG THE EAST PROPERTY LINE -
 WHERE/HOW DO THEY DRAIN? THEY CANNOT FLOW TO THE EAST
 PROPERTY LINE TOWARD THE ADJACENT PROPERTY.
  
 THESE CONDITIONS FOR SITE PLAN APPROVAL WERE ADDED
 10/4/22 WHEN THE PASSED STATUS WAS MADE:
  
 - SHOW THE LANDSCAPE AREA ALONG THE WEST PROPERTY AS
 HAVING A DEPRESSED AREA FOR STORING STORMWATER RUNOFF
 TO REDUCE THE AMOUNT OF RUNOFF FLOWING TO THE STREET.
 [COMMENT #3]
  
 - FINISHED FLOOR ELEVATIONS SHALL BE LISTED ON THE
 CIVIL DRAWINGS. [COMMENT #7]
  
 - INCLUDE A DETAIL OF THE EXFILTRATION TRENCH. LABEL
 THE WIDTH, AND ELEVATIONS OF THE TOP AND BOTTOM OF THE
 TRENCH. [COMMENT #8]
  
 - PROVIDE A DETAIL OF THE CONTROL STRUCTURE. [COMMENT
 #9]
  
 - ADDITIONAL EXISTING DROP CURBS AND TRANSITIONS SHALL
 BE REPLACED WITH FDOT TYPE F CURB AND GUTTER FOR 3
 SECTIONS ON S. DIXIE HIGHWAY AND ONE SECTION ON
 OKEECHOBEE BLVD. LABEL ALL NEW CURBING ON THE PAVING,
 GRADING AND DRAINAGE PLANS.[COMMENT #12]
  
 - USE DIFFERENT SYMBOLS FOR EXISTING AND PROPOSED SPOT
 ELEVATIONS AND INCLUDE THE SYMBOLS IN THE SHEET LEGEND.
 [COMMENT #13]
  
 - ON THE TYPICAL CROSS SECTIONS, SHOW SWALE SECTIONS
 FOR STORING STORMWATER RUNOFF IN THE LANDSCAPE BED
 AREAS. [COMMENTS #19 AND #20]
  
 - LABEL S. DIXIE R/W ON SECTION C-C. SHOW SHALLOW SWALE
 BETWEEN THE PROPERTY LINE AND BUILDING THAT WILL DIRECT
 FLOW TO STRUCTURES DS-5 AND DS-6. [COMMENT #21]
  
 - LABEL ALL OF THE EXFILTRATION TRENCHES AND THEIR
 LENGTHS AND ENSURE THE DESIGN INDICATES HOW THE
 TRENCHES WILL BE SURCHARGED TO FUNCTION. [COMMENTS #22
 AND #23]
  
 - SHOW WHERE THE ROOF DRAINS WILL BE CONNECTED TO THE
 ONSITE DRAINAGE SYSTEM. [COMMENT #24]
  
 - THE TWO PAVER AREAS ALONG THE EAST PROPERTY LINE
 CANNOT DRAIN ONTO THE ADJACENT PROPERTY. [COMMENT #25]
  
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  

Review Stop STORM STORMWATER
Rev No 2 Status F Date 07-21-2022 Cont ID  
Sent By tward Date 07-21-2022 Time 16:52 Rev Time 0.00
Received By tward Date 07-21-2022 Time 16:54 Sent To  
Notes
2022-07-21 16:52:42THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 7/5/2022 SUBMITTAL:
  
 1. [SATISFIED] THE CITY'S OFFICIAL VERTICAL DATUM IS
 NGVD1929. THE CITY HAS ALLOWED THE USE OF NAVD1988 AS
 LONG AS THE CONVERSION EQUATION TO NGVD1929 AT THE
 PROJECT LOCATION IS PROVIDED. PROVIDE VERTICAL DATUM
 REFERENCE AND CONVERSION TO NGVD1929 ON EVERY SHEET
 WITH ELEVATION INFORMATION.
  
 2. [SATISFIED] PROVIDE TRENCH DRAIN ACROSS SOUTH
 DRIVEWAY TO INTERCEPT RUNOFF BEFORE CROSSING THE
 SIDEWALK.
  
 3. [PARTIALLY SATISFIED] PROVIDE A TRENCH DRAIN ALONG
 THE WEST PROPERTY LINE TO INTERCEPT RUNOFF. ADDITIONAL
 COMMENTS: LANDSCAPE AREA SHOULD BE GRADED TO STORE
 RUNOFF (SWALE SECTION). PUBLIC OPEN SPACE AND SIDEWALK
 SHOULD BE GRADED TO DRAIN TO DS-04 AND DS-05. DS-04
 SHOULD BE IN A DEPRESSION TO COLLECT THE RUNOFF FROM
 THE OPEN SPACE AREA.
  
 4. [SATISFIED] FDOT MAINTAINS THE RIGHT OF WAY FOR
 OKEECHOBEE BLVD., LAKEVIEW AVE. AND S. DIXIE HWY.
  
 5. [NOT SATISFIED] PROVIDE CROSS SECTIONS FROM
 CENTERLINE OF RIGHTS OF WAY TO FACE OF BUILDING. SHOW
 BREAK POINTS, DISTANCES FROM BACK OF CURB TO PROPERTY
 LINE, FROM PROPERTY LINE TO FACE OF BUILDING, WIDTH OF
 SIDEWALK, CURB, ETC. LABEL THE RIGHT OF WAY (OKEECHOBEE
 BLVD, LAKEVIEW AVE, S. DIXIE HWY). ADDITIONAL COMMENTS:
 THE CROSS SECTIONS WILL SHOW HOW THE SIDEWALK AREAS AND
 DRIVEWAY APRONS WILL BE GRADED TO MEET A.D.A. CRITERIA.
 THE CONTOURING ON THE PAVING AND GRADING PLAN APPEAR TO
 RESULT IN SIDEWALK CROSS SLOPES STEEPER THAN 2%.
  
 6. [PARTIALLY SATISFIED] PROVIDE EXISTING SPOT GRADES
 ALONG EDGES OF PAVEMENT. ADDITIONAL COMMENT: WHERE DID
 THE EXISTING SPOT GRADES COME FROM? THEY DO NOT APPEAR
 ON THE SURVEY.
  
 7. [PARTIALLY SATISFIED] PROVIDE PROPOSED FINISHED
 FLOOR ELEVATION. ADDITIONAL COMMENT ? PROVIDE THE FFE'S
 ON THE CIVIL PLANS.
  
 8. [PARTIALLY SATISFIED] PROVIDE A DETAIL FOR THE
 EXFILTRATION TRENCH. LABEL THE WIDTH AND ELEVATIONS OF
 THE TOP AND BOTTOM OF THE TRENCH. ADDITIONAL COMMENT:
 REQUESTED INFORMATION CAN BE PROVIDED WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
 9. [NOT SATISFIED] PROVIDE A DETAIL FOR THE CONTROL
 STRUCTURE. THE CITY DOES NOT ALLOW THE USE OF BLEEDERS
 WITH EXFILTRATION TRENCH SYSTEMS. ADDITIONAL COMMENT:
 CONTROL STRUCTURE DETAIL CAN BE PROVIDED WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
 10. [PARTIALLY SATISFIED] MINIMUM DIAMETER OF STORM
 PIPE TO BE INSTALLED IN THE RIGHT OF WAY IS 15 INCH
 RCP. ADDITIONAL COMMENT: PVC PIPE FROM DS-04 SHOULD BE
 RCP.
  
 NEW COMMENTS:
  
 11. CONTOURING OF SIDEWALK APPEARS TO RESULT IN CROSS
 SLOPES STEEPER THAN 2%.
  
 12. REPLACE ALL DROP CURB OF EXISTING DRIVEWAYS WITH
 TYPE F CURB AND GUTTER.
  
 13. INCLUDE IN THE LEGEND OF THE PAVING AND GRADING
 PLAN THE SPOT GRADE SYMBOLS AND CONTOUR LINE SYMBOL.
 USE A DIFFERENT SYMBOL FOR EXISTING SPOT GRADES.
  
 14. SHOW AND LABEL THE DRAINAGE CONTROL STRUCTURE.
  
 15. INDICATE HOW WATER QUALITY TREATMENT WILL BE
 PROVIDED FOR THE RUNOFF FROM THE NORTHWEST CORNER OF
 THE SITE (DRAINING TO DS-04 AND DS-05.
  
 16. ENSURE THERE IS ADEQUATE VERTICAL CLEARANCE WITHIN
 THE BUILDING TO BE ABLE TO SERVICE THE EXFILTRATION
 TRENCHES AND DRAINAGE STRUCTURES AND TO BE ABLE TO
 REPLACE THE EXFILTRATION TRENCHES WHEN THEY ARE NO
 LONGER FUNCTIONING AS INTENDED.
  
 17. CONSIDER INCORPORATING LOW IMPACT DEVELOPMENT
 DRAINAGE SYSTEMS IN LIEU OR IN ADDITION TO THE
 EXFILTRATION TRENCHES.
  
 18. REFERENCE FDOT STANDARD PLAN NUMBERS INSTEAD OF
 FDOT STANDARD INDEX NUMBERS.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  

Review Stop STORM STORMWATER
Rev No 1 Status F Date 06-06-2022 Cont ID  
Sent By tward Date 06-06-2022 Time 13:07 Rev Time 0.00
Received By tward Date 06-06-2022 Time 13:11 Sent To  
Notes
2022-06-06 13:11:32THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. THE CITY?S OFFICIAL VERTICAL DATUM IS NGVD1929. THE
 CITY HAS ALLOWED THE USE OF NAVD1988 AS LONG AS THE
 CONVERSION EQUATION TO NGVD1929 AT THE PROJECT LOCATION
 IS PROVIDED. PROVIDE VERTICAL DATUM REFERENCE AND
 CONVERSION TO NGVD1929 ON EVERY SHEET WITH ELEVATION
 INFORMATION.
  
 2. PROVIDE TRENCH DRAIN ACROSS SOUTH DRIVEWAY TO
 INTERCEPT RUNOFF BEFORE CROSSING THE SIDEWALK.
  
 3. PROVIDE A TRENCH DRAIN ALONG THE WEST PROPERTY LINE
 TO INTERCEPT RUNOFF.
  
 4. FDOT MAINTAINS THE RIGHT OF WAY FOR OKEECHOBEE
 BLVD., LAKEVIEW AVE. AND S. DIXIE HWY.
  
 5. PROVIDE CROSS SECTIONS FROM CENTERLINE OF RIGHTS OF
 WAY TO FACE OF BUILDING. SHOW BREAK POINTS, DISTANCES
 FROM BACK OF CURB TO PROPERTY LINE, FROM PROPERTY LINE
 TO FACE OF BUILDING, WIDTH OF SIDEWALK, CURB, ETC.
 LABEL THE RIGHT OF WAY (OKEECHOBEE BLVD, LAKEVIEW AVE,
 S. DIXIE HWY).
  
 6. PROVIDE EXISTING SPOT GRADES ALONG EDGES OF
 PAVEMENT.
  
 7. PROVIDE PROPOSED FINISHED FLOOR ELEVATION.
  
 8. PROVIDE A DETAIL FOR THE EXFILTRATION TRENCH. LABEL
 THE WIDTH AND ELEVATIONS OF THE TOP AND BOTTOM OF THE
 TRENCH.
  
 9. PROVIDE A DETAIL FOR THE CONTROL STRUCTURE. THE CITY
 DOES NOT ALLOW THE USE OF BLEEDERS WITH EXFILTRATION
 TRENCH SYSTEMS.
  
 10. MINIMUM DIAMETER OF STORM PIPE TO BE INSTALLED IN
 THE RIGHT OF WAY IS 15? RCP.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH
 THE ENGINEERING PERMIT SUBMITTAL.
  
 2. PROVIDE COPY OF SFWMD ERP PERMIT MODIFICATION BEFORE
 START OF CONSTRUCTION.
  
 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  

Review Stop SURVEY SURVEYING
Rev No 2 Status P Date 10-03-2022 Cont ID  
Sent By vnoel Date 10-03-2022 Time 11:55 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
2022-10-03 11:57:00CONDITIONS OF APPROVAL:
  
 1. MMOA WITH FDOT AND MAINTENANCE AGREEMENT WITH CITY
 PRIOR TO C.O.
 2. REPLAT PRIOR TO C.O.

Review Stop SURVEY SURVEYING
Rev No 1 Status F Date 06-01-2022 Cont ID  
Sent By vnoel Date 06-01-2022 Time 09:40 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
2022-06-01 09:50:421. REPLAT WILL BE REQUIRED.
 2. FDOT PERMITS REQUIRED FOR DRIVEWAY CONNECTIONS.
 3. MMOA WITH FDOT AND DEVELOPER'S AGREEMENT WILL BE
 REQUIRED FOR MAINTENANCE OF PROPOSED RIGHT-OF-WAY
 IMPROVEMENTS.
 4. WATER SYSTEM WILL NEED TO BE RE-ENGINEERED. CITY
 WILL NOT ACCEPT WATER MAIN UNDER BUILDING. SUGGEST
 MASTER METER AT RIGHT-OF-WAY LINE.
 5. SANITARY SYSTEM WILL BE PRIVATE. ADD MANHOLE AT
 RIGHT-OF-WAY OF OKEECHOBEE AS THE POINT OF SERVICE.

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 4 Status P Date 10-18-2022 Cont ID  
Sent By   Date 10-18-2022 Time   Rev Time 0.00
Received By   Date 10-18-2022 Time   Sent To  
Notes
2022-10-18 13:10:39APPROVED WITH THE FOLLOWING CONDITIONS:
 1) PROVIDE UPDATED TRAFFIC AND VALET ANALYSES PER THE
 NORTHERN DRIVEWAY CHANGE IN DIRECTIONALITY
 2) CORRECT ROADWAY PAVEMENT MARKINGS IN THE
 TRANSPORTATION SITE PLAN
 3) RE-ALIGN THE NORTHERN AND EASTERN PEDESTRIAN
 CROSSWALKS TO BE PERPENDICULAR TO THE CROSSING ROAD AT
 THE OKEECHOBEE AND DIXIE INTERSECTION
 4) PROVIDE THE UPDATED FDOT D4 LETTER WITH RESPECT TO
 THE CHANGE IN THE NORTHERN DRIVEWAY DIRECTIONALITY AND
 THE MINIMUM DISTANCE BETWEEN THE SOUTHERN DRIVEWAY AND
 DIXIE
 5) DISCUSS AND REFINE TDM MEASURES
  
 PAST COMMENTS
 1) SATISFIED. GIVEN THE SENSITIVE LOCATION OF THE
 PROPOSED DEVELOPMENT, A METHODOLOGY MEETING SHALL BE
 SCHEDULED FOR A COMPREHENSIVE TRAFFIC STUDY
 2) PARTIALLY SATISFIED. PROVIDE A THOROUGH VALET
 SERVICE/QUEUE ANALYSIS. SHEET A1.02 SHOWS A THIRD VALET
 LOCATION, WHICH IS NOT MENTIONED IN THE ANALYSIS.
 MOREOVER, VALET SPACES MUST BE IDENTIFIED IN THE SITE
 PLANS, ANALYSIS MUST INCLUDE MATHEMATICAL ANALYSIS,
 PROCESS TIME MUST BE CALCULATED AND PROPERLY BROKEN
 DOWN (I.E. ACCEPTANCE/DELIVERY PROCESSING TIME AT VALET
 STAND, DRIVE UP/DOWN TIME, WALK UP/DOWN TIME). FULL
 PATH FROM STAND TO PARKING STALLS MUST BE SHOWN, NOT
 JUST GROUND OPERATIONS
 3) SATISFIED. PROVIDE COUNTY TPS LETTER, ONCE RECEIVED
 4) SATISFIED. PROVIDE FDOT D4 ACCESS MANAGEMENT LETTER,
 ONCE RECEIVED
 5) PARTIALLY SATISFIED. ON THE SITE PLAN, PLEASE
 SHOWCASE BASIC CURB DETAILS (I.E. DRIVEWAY AND PARKING
 STALLS) ON THE OPPOSITE SIDE OF THE ROADS SURROUNDING
 THE PROPOSED DEVELOPMENT. PLEASE PROVIDE DOCUMENT NAME
 AND SHEET NUMBER SHOWCASING SUCH FEATURES. REQUEST IS
 FOR A CLEAN SITE PLAN, SHOWCASING AND HIGHLIGHTING
 TRANSPORTATION ELEMENTS (E.G. NO UNDERGROUND UTILITY
 DETAILS, ONLY SURFACE ITEMS SUCH AS POLES AND BASINS).
 ALSO, NONE OF THE CIVIL OR ARCHITECTURAL PLANS ARE
 SHOWCASING PAVEMENTS MARKINGS AND LANE WIDTHS OF THE
 SURROUNDING ROADWAY NETWORK. PLEASE PROVIDE A DEDICATED
 AND DETAILED TRANSPORTATION-ORIENTED SITE PLAN. SEVERAL
 SIDEWALKS, LANES,
 6) SATISFIED. SHEET C-102, RIGHT DRAWING. WB-40
 MANEUVERING SHOWS ENCROACHMENT WITH THE INTERNAL
 SIDEWALK BY THE DROP-OFF AREA. IS THAT PORTION OF THE
 WALKWAY CURB LESS?
 7) SATISFIED. SHEET A1.04 TO 06, PROVIDE AND CLEARLY
 MARK TURNAROUND SPACE AT THE SOUTHERN DEAD-END
 8) SATISFIED. SHEET A1.07, PROVIDE AND CLEARLY MARK
 TURNAROUND SPACE AT THE SOUTHERN AND NORTHERN DEAD-ENDS
 9) SATISFIED. IDENTIFY AND DESIGNATE AN EASILY
 ACCESSIBLE MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20
 FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS. FOR
 THE LATTER ITEM, MORE SPECIFICALLY: A CONDUIT (2???
 SCHEDULE 40 PVC) TO THE POWER SOURCE WITH AN ELECTRICAL
 PULL BOX (240V ??? 10,000W CIRCUIT). PLEASE PROVIDE
 DOCUMENT NAME AND SHEET NUMBER SHOWCASING SUCH FEATURE.
 10) SATISFIED. PROVIDE NUMBER AND LOCATION OF BICYCLE
 PARKING
 11) SATISFIED. A MINIMUM OF 2 ADA VAN ACCESSIBLE
 PARKING SPACES MUST BE PROVIDED, PLEASE INDICATE THOSE
 STALLS
 12) SATISFIED. PROVIDE 10 FEET WIDE SIDEWALKS AROUND
 THE PROPOSED DEVELOPMENT. THIS ITEM WILL BE REVIEWED
 AND CLEARED ONCE A TRANSPORTATION SPECIFIC SITE PLAN IS
 PROVIDED. CODE REQUIRES A MINIMUM OF 8 FEET, BUT
 CONSIDERING THE LOCATION OF THE PROPOSED DEVELOPMENT
 AND THE POTENTIAL FOR HIGH PEDESTRIAN TRAFFIC, WIDER
 SIDEWALKS ARE RECOMMENDED.
 13) SATISFIED. REMOVE/RELOCATE THE LANDSCAPE ISLAND
 INSTALLED IN THE MIDDLE OF THE SIDEWALK ALONG DIXIE AND
 OKEECHOBEE OR PROVIDE A JUSTIFICATION. SUCH FEATURES
 ARE SIGNIFICANTLY SPLITTING AND REDUCING THE WALKABLE
 AREA
 14) SATISFIED. REMOVE THE PARALLEL PARKING STALLS ON
 DIXIE
 15) PARTIALLY SATISFIED. MAKE THE NORTHERN DRIVEWAY ON
 LAKEVIEW AVE EXIT ONLY. PROVIDE A TRAFFIC ANALYSIS
 QUANTIFYING THE INCREASE IN TRAFFIC, IF ANY. DRIVEWAY
 CONFIGURATION OF NEARBY BUILDINGS IS NOT A SUFFICIENT
 JUSTIFICATION. PER THE FDOT DOCUMENT: ???THIS LETTER
 DOES NOT GUARANTEE PERMIT APPROVAL. THE PERMIT MAY BE
 DENIED BASED ON THE REVIEW OF THE SUBMITTED ENGINEERING
 PLANS???. CONSIDERING THE VICINITY OF THE GARAGE RAMP
 AND THE HOTEL VALET OPERATION TO THE NORTHERN DRIVEWAY,
 THERE ARE A SIGNIFICANT NUMBER OF CONFLICT POINTS
 NEGATIVELY AFFECTING THE INTERNAL CIRCULATION, WITH A
 SIGNIFICANT INCREASE OF POTENTIAL SPILLBACKS INTO
 OKEECHOBEE BLVD. THE ONE-WAY EXIT ONLY IS STRONGLY
 RECOMMENDED
 16) SATISFIED CONSIDER MAKING THE SOUTHERN DRIVEWAY ON
 OKEECHOBEE BLVD ENTRY ONLY. PROVIDE A TRAFFIC. ANALYSIS
 QUANTIFYING THE INCREASE IN TRAFFIC. PROVIDE A TRAFFIC
 ANALYSIS QUANTIFYING THE INCREASE IN TRAFFIC, IF ANY.
 DRIVEWAY CONFIGURATION OF NEARBY BUILDINGS IS NOT A
 SUFFICIENT JUSTIFICATION. PER THE FDOT DOCUMENT:
 ???THIS LETTER DOES NOT GUARANTEE PERMIT APPROVAL. THE
 PERMIT MAY BE DENIED BASED ON THE REVIEW OF THE
 SUBMITTED ENGINEERING PLANS???. IF THE NORTHERN
 DRIVEWAY WERE TO BE CONFIGURED AS EXIT ONLY, THE
 SOUTHERN ONE COULD BE FULL ACCESS
 17) SATISFIED. HAS THE WESTBOUND LEFT-TURN STORAGE LANE
 ON LAKEVIEW AVE BEEN SHORTENED BECAUSE OF THE PROPOSED
 NORTHERN DRIVEWAY LOCATION? PLEASE PROVIDE DETAILED
 MEASUREMENTS OF THE STORAGE LANE ON THE SITE PLAN
 18) PARTIALLY SATISFIED. THE FDOT LETTER AUTHORIZED THE
 INSTALLATION OF BOTH THE NORTHERN AND SOUTHERN
 DRIVEWAYS APPROXIMATELY 150 FEET FROM DIXIE AND 330
 FEET FROM OLIVE. PLEASE SHOWCASE SUCH DISTANCES ON THE
 SITE PLAN.
 19) SATISFIED. SHOWCASE ALL THE DISTANCES AND FEATURES
 MENTIONED OR REQUESTED IN THE FDOT LETTER
 20) SATISFIED. PEDESTRIAN RAMPS ARE MISSING
 21) SATISFIED. SIDEWALK WIDTHS ARE MISSING ON SEVERAL
 LOCATIONS
 22) SATISFIED. INTERNAL DRIVEWAYS, LANES AND WALKWAYS
 MUST BE DIMENSIONED
 23) SATISFIED. SHOWCASE AND DIMENSION THE REQUIRED
 VISIBILITY TRIANGLES
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 3 Status F Date 08-22-2022 Cont ID  
Sent By   Date 08-22-2022 Time   Rev Time 0.00
Received By   Date 08-22-2022 Time   Sent To  
Notes
2022-08-22 20:54:19TRAFFIC COMMENTS
 1) SATISFIED. GIVEN THE SENSITIVE LOCATION OF THE
 PROPOSED DEVELOPMENT, A METHODOLOGY MEETING SHALL BE
 SCHEDULED FOR A COMPREHENSIVE TRAFFIC STUDY
 2) PARTIALLY SATISFIED. PROVIDE A THOROUGH VALET
 SERVICE/QUEUE ANALYSIS. SHEET A1.02 SHOWS A THIRD VALET
 LOCATION, WHICH IS NOT MENTIONED IN THE ANALYSIS.
 MOREOVER, VALET SPACES MUST BE IDENTIFIED IN THE SITE
 PLANS, ANALYSIS MUST INCLUDE MATHEMATICAL ANALYSIS,
 PROCESS TIME MUST BE CALCULATED AND PROPERLY BROKEN
 DOWN (I.E. ACCEPTANCE/DELIVERY PROCESSING TIME AT VALET
 STAND, DRIVE UP/DOWN TIME, WALK UP/DOWN TIME). FULL
 PATH FROM STAND TO PARKING STALLS MUST BE SHOWN, NOT
 JUST GROUND OPERATIONS
 3) SATISFIED. PROVIDE COUNTY TPS LETTER, ONCE RECEIVED
 4) SATISFIED. PROVIDE FDOT D4 ACCESS MANAGEMENT LETTER,
 ONCE RECEIVED
  
 SITE COMMENTS
 5) NOT SATISFIED. ON THE SITE PLAN, PLEASE SHOWCASE
 BASIC CURB DETAILS (I.E. DRIVEWAY AND PARKING STALLS)
 ON THE OPPOSITE SIDE OF THE ROADS SURROUNDING THE
 PROPOSED DEVELOPMENT. PLEASE PROVIDE DOCUMENT NAME AND
 SHEET NUMBER SHOWCASING SUCH FEATURES. REQUEST IS FOR A
 CLEAN SITE PLAN, SHOWCASING AND HIGHLIGHTING
 TRANSPORTATION ELEMENTS (E.G. NO UNDERGROUND UTILITY
 DETAILS, ONLY SURFACE ITEMS SUCH AS POLES AND BASINS).
 ALSO, NONE OF THE CIVIL OR ARCHITECTURAL PLANS ARE
 SHOWCASING PAVEMENTS MARKINGS AND LANE WIDTHS OF THE
 SURROUNDING ROADWAY NETWORK. PLEASE PROVIDE A DEDICATED
 AND DETAILED TRANSPORTATION-ORIENTED SITE PLAN. SEVERAL
 SIDEWALKS, LANES,
 6) SATISFIED. SHEET C-102, RIGHT DRAWING. WB-40
 MANEUVERING SHOWS ENCROACHMENT WITH THE INTERNAL
 SIDEWALK BY THE DROP-OFF AREA. IS THAT PORTION OF THE
 WALKWAY CURB LESS?
 7) SATISFIED. SHEET A1.04 TO 06, PROVIDE AND CLEARLY
 MARK TURNAROUND SPACE AT THE SOUTHERN DEAD-END
 8) SATISFIED. SHEET A1.07, PROVIDE AND CLEARLY MARK
 TURNAROUND SPACE AT THE SOUTHERN AND NORTHERN DEAD-ENDS
 9) SATISFIED. IDENTIFY AND DESIGNATE AN EASILY
 ACCESSIBLE MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20
 FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS. FOR
 THE LATTER ITEM, MORE SPECIFICALLY: A CONDUIT (2?
 SCHEDULE 40 PVC) TO THE POWER SOURCE WITH AN ELECTRICAL
 PULL BOX (240V ? 10,000W CIRCUIT). PLEASE PROVIDE
 DOCUMENT NAME AND SHEET NUMBER SHOWCASING SUCH FEATURE.
 10) SATISFIED. PROVIDE NUMBER AND LOCATION OF BICYCLE
 PARKING
 11) SATISFIED. A MINIMUM OF 2 ADA VAN ACCESSIBLE
 PARKING SPACES MUST BE PROVIDED, PLEASE INDICATE THOSE
 STALLS
 12) NOT SATISFIED. PROVIDE 10 FEET WIDE SIDEWALKS
 AROUND THE PROPOSED DEVELOPMENT. THIS ITEM WILL BE
 REVIEWED AND CLEARED ONCE A TRANSPORTATION SPECIFIC
 SITE PLAN IS PROVIDED. CODE REQUIRES A MINIMUM OF 8
 FEET, BUT CONSIDERING THE LOCATION OF THE PROPOSED
 DEVELOPMENT AND THE POTENTIAL FOR HIGH PEDESTRIAN
 TRAFFIC, WIDER SIDEWALKS ARE RECOMMENDED.
 13) REMOVE/RELOCATE THE LANDSCAPE ISLAND INSTALLED IN
 THE MIDDLE OF THE SIDEWALK ALONG DIXIE AND OKEECHOBEE
 OR PROVIDE A JUSTIFICATION. SUCH FEATURES ARE
 SIGNIFICANTLY SPLITTING AND REDUCING THE WALKABLE AREA
 14) SATISFIED. REMOVE THE PARALLEL PARKING STALLS ON
 DIXIE
 15) PARTIALLY SATISFIED. MAKE THE NORTHERN DRIVEWAY ON
 LAKEVIEW AVE EXIT ONLY. PROVIDE A TRAFFIC ANALYSIS
 QUANTIFYING THE INCREASE IN TRAFFIC, IF ANY. DRIVEWAY
 CONFIGURATION OF NEARBY BUILDINGS IS NOT A SUFFICIENT
 JUSTIFICATION. PER THE FDOT DOCUMENT: ?THIS LETTER DOES
 NOT GUARANTEE PERMIT APPROVAL. THE PERMIT MAY BE DENIED
 BASED ON THE REVIEW OF THE SUBMITTED ENGINEERING
 PLANS?. CONSIDERING THE VICINITY OF THE GARAGE RAMP AND
 THE HOTEL VALET OPERATION TO THE NORTHERN DRIVEWAY,
 THERE ARE A SIGNIFICANT NUMBER OF CONFLICT POINTS
 NEGATIVELY AFFECTING THE INTERNAL CIRCULATION, WITH A
 SIGNIFICANT INCREASE OF POTENTIAL SPILLBACKS INTO
 OKEECHOBEE BLVD. THE ONE-WAY EXIT ONLY IS STRONGLY
 RECOMMENDED
 16) PARTIALLY SATISFIED CONSIDER MAKING THE SOUTHERN
 DRIVEWAY ON OKEECHOBEE BLVD ENTRY ONLY. PROVIDE A
 TRAFFIC. ANALYSIS QUANTIFYING THE INCREASE IN TRAFFIC.
 PROVIDE A TRAFFIC ANALYSIS QUANTIFYING THE INCREASE IN
 TRAFFIC, IF ANY. DRIVEWAY CONFIGURATION OF NEARBY
 BUILDINGS IS NOT A SUFFICIENT JUSTIFICATION. PER THE
 FDOT DOCUMENT: ?THIS LETTER DOES NOT GUARANTEE PERMIT
 APPROVAL. THE PERMIT MAY BE DENIED BASED ON THE REVIEW
 OF THE SUBMITTED ENGINEERING PLANS?. IF THE NORTHERN
 DRIVEWAY WERE TO BE CONFIGURED AS EXIT ONLY, THE
 SOUTHERN ONE COULD BE FULL ACCESS
 17) HAS THE WESTBOUND LEFT-TURN STORAGE LANE ON
 LAKEVIEW AVE BEEN SHORTENED BECAUSE OF THE PROPOSED
 NORTHERN DRIVEWAY LOCATION? PLEASE PROVIDE DETAILED
 MEASUREMENTS OF THE STORAGE LANE ON THE SITE PLAN
 18) THE FDOT LETTER AUTHORIZED THE INSTALLATION OF BOTH
 THE NORTHERN AND SOUTHERN DRIVEWAYS APPROXIMATELY 150
 FEET FROM DIXIE AND 330 FEET FROM OLIVE. PLEASE
 SHOWCASE SUCH DISTANCES ON THE SITE PLAN
 19) SHOWCASE ALL THE DISTANCES AND FEATURES MENTIONED
 OR REQUESTED IN THE FDOT LETTER
 20) PEDESTRIAN RAMPS ARE MISSING
 21) SIDEWALK WIDTHS ARE MISSING ON SEVERAL LOCATIONS
 22) INTERNAL DRIVEWAYS, LANES AND WALKWAYS MUST BE
 DIMENSIONED
 23) SHOWCASE AND DIMENSION THE REQUIRED VISIBILITY
 TRIANGLES
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 2 Status F Date 07-28-2022 Cont ID  
Sent By   Date 07-28-2022 Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
2022-07-28 08:42:09TRAFFIC COMMENTS
 1) SATISFIED. GIVEN THE SENSITIVE LOCATION OF THE
 PROPOSED DEVELOPMENT, A METHODOLOGY MEETING SHALL BE
 SCHEDULED FOR A COMPREHENSIVE TRAFFIC STUDY
 2) SATISFIED. PROVIDE A THOROUGH VALET SERVICE/QUEUE
 ANALYSIS
 3) PARTIALLY SATISFIED. PROVIDE COUNTY TPS LETTER, ONCE
 RECEIVED
 4) PARTIALLY SATISFIED. PROVIDE FDOT D4 ACCESS
 MANAGEMENT LETTER, ONCE RECEIVED
  
 SITE COMMENTS
 5) NOT SATISFIED. ON THE SITE PLAN, PLEASE SHOWCASE
 BASIC CURB DETAILS (I.E. DRIVEWAY AND PARKING STALLS)
 ON THE OPPOSITE SIDE OF THE ROADS SURROUNDING THE
 PROPOSED DEVELOPMENT. PLEASE PROVIDE DOCUMENT NAME AND
 SHEET NUMBER SHOWCASING SUCH FEATURES. REQUEST IS FOR A
 CLEAN SITE PLAN, SHOWCASING AND HIGHLIGHTING
 TRANSPORTATION ELEMENTS (E.G. NO UNDERGROUND UTILITY
 DETAILS, ONLY SURFACE ITEMS SUCH AS POLES AND BASINS).
 ALSO, NONE OF THE CIVIL OR ARCHITECTURAL PLANS ARE
 SHOWCASING PAVEMENTS MARKINGS AND LANE WIDTHS OF THE
 SURROUNDING ROADWAY NETWORK. PLEASE PROVIDE A DEDICATED
 AND DETAILED TRANSPORTATION-ORIENTED SITE PLAN.
 6) SATISFIED. SHEET C-102, RIGHT DRAWING. WB-40
 MANEUVERING SHOWS ENCROACHMENT WITH THE INTERNAL
 SIDEWALK BY THE DROP-OFF AREA. IS THAT PORTION OF THE
 WALKWAY CURB LESS?
 7) SATISFIED. SHEET A1.04 TO 06, PROVIDE AND CLEARLY
 MARK TURNAROUND SPACE AT THE SOUTHERN DEAD-END
 8) SATISFIED. SHEET A1.07, PROVIDE AND CLEARLY MARK
 TURNAROUND SPACE AT THE SOUTHERN AND NORTHERN DEAD-ENDS
 9) SATISFIED. IDENTIFY AND DESIGNATE AN EASILY
 ACCESSIBLE MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20
 FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS. FOR
 THE LATTER ITEM, MORE SPECIFICALLY: A CONDUIT (2?
 SCHEDULE 40 PVC) TO THE POWER SOURCE WITH AN ELECTRICAL
 PULL BOX (240V 10,000W CIRCUIT). PLEASE PROVIDE
 DOCUMENT NAME AND SHEET NUMBER SHOWCASING SUCH FEATURE.
 10) SATISFIED. PROVIDE NUMBER AND LOCATION OF BICYCLE
 PARKING
 11) SATISFIED. A MINIMUM OF 2 ADA VAN ACCESSIBLE
 PARKING SPACES MUST BE PROVIDED, PLEASE INDICATE THOSE
 STALLS
 12) NOT SATISFIED. PROVIDE 10 FEET WIDE SIDEWALKS
 AROUND THE PROPOSED DEVELOPMENT. THIS ITEM WILL BE
 REVIEWED AND CLEARED ONCE A TRANSPORTATION SPECIFIC
 SITE PLAN IS PROVIDED.
 13) SATISFIED. REMOVE THE PARALLEL PARKING STALLS ON
 DIXIE
 14) PARTIALLY SATISFIED. MAKE THE NORTHERN DRIVEWAY ON
 LAKEVIEW AVE EXIT ONLY. PROVIDE A TRAFFIC ANALYSIS
 QUANTIFYING THE INCREASE IN TRAFFIC, IF ANY. DRIVEWAY
 CONFIGURATION OF NEARBY BUILDINGS IS NOT A SUFFICIENT
 JUSTIFICATION.
 15) PARTIALLY SATISFIED CONSIDER MAKING THE SOUTHERN
 DRIVEWAY ON OKEECHOBEE BLVD ENTRY ONLY. PROVIDE A
 TRAFFIC. ANALYSIS QUANTIFYING THE INCREASE IN TRAFFIC.
 PROVIDE A TRAFFIC ANALYSIS QUANTIFYING THE INCREASE IN
 TRAFFIC, IF ANY. DRIVEWAY CONFIGURATION OF NEARBY
 BUILDINGS IS NOT A SUFFICIENT JUSTIFICATION.
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status F Date 06-08-2022 Cont ID  
Sent By   Date 06-08-2022 Time   Rev Time 0.00
Received By   Date 06-08-2022 Time   Sent To  
Notes
2022-06-08 21:22:53TRAFFIC COMMENTS
 1) GIVEN THE SENSITIVE LOCATION OF THE PROPOSED
 DEVELOPMENT, A METHODOLOGY MEETING SHALL BE SCHEDULED
 FOR A COMPREHENSIVE TRAFFIC STUDY
 2) PROVIDE A THOROUGH VALET SERVICE/QUEUE ANALYSIS
 3) PROVIDE COUNTY TPS LETTER
 4) PROVIDE FDOT D4 ACCESS MANAGEMENT LETTER
  
 SITE COMMENTS
 5) ON THE SITE PLAN, PLEASE SHOWCASE BASIC CURB DETAILS
 (I.E. DRIVEWAY AND PARKING STALLS) ON THE OPPOSITE SIDE
 OF THE ROADS SURROUNDING THE PROPOSED DEVELOPMENT.
 PLEASE PROVIDE DOCUMENT NAME AND SHEET NUMBER
 SHOWCASING SUCH FEATURES.
 6) SHEET C-102, RIGHT DRAWING. WB-40 MANEUVERING SHOWS
 ENCROACHMENT WITH THE INTERNAL SIDEWALK BY THE DROP-OFF
 AREA. IS THAT PORTION OF THE WALKWAY CURB LESS?
 7) SHEET A1.04 TO 06, PROVIDE AND CLEARLY MARK
 TURNAROUND SPACE AT THE SOUTHERN DEAD-END
 8) SHEET A1.07, PROVIDE AND CLEARLY MARK TURNAROUND
 SPACE AT THE SOUTHERN AND NORTHERN DEAD-ENDS
 9) IDENTIFY AND DESIGNATE AN EASILY ACCESSIBLE
 MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20 FEET) AND
 PROVIDE BASIC ELECTRIFICATION READINESS. FOR THE LATTER
 ITEM, MORE SPECIFICALLY: A CONDUIT (2? SCHEDULE 40 PVC)
 TO THE POWER SOURCE WITH AN ELECTRICAL PULL BOX (240V ?
 10,000W CIRCUIT). PLEASE PROVIDE DOCUMENT NAME AND
 SHEET NUMBER SHOWCASING SUCH FEATURE.
 10) PROVIDE NUMBER AND LOCATION OF BICYCLE PARKING
 11) A MINIMUM OF 2 ADA VAN ACCESSIBLE PARKING SPACES
 MUST BE PROVIDED, PLEASE INDICATE THOSE STALLS
 12) PROVIDE 10 FEET WIDE SIDEWALKS AROUND THE PROPOSED
 DEVELOPMENT
 13) REMOVE THE PARALLEL PARKING STALLS ON DIXIE
 14) MAKE THE NORTHERN DRIVEWAY ON LAKEVIEW AVE EXIT
 ONLY
 15) CONSIDER MAKING THE SOUTHERN DRIVEWAY ON OKEECHOBEE
 BLVD ENTRY ONLY
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop Z ZONING
Rev No 4 Status P Date 09-30-2022 Cont ID  
Sent By llouie Date 09-30-2022 Time   Rev Time 0.00
Received By llouie Date 09-30-2022 Time   Sent To  
Notes
2022-09-30 10:57:40*** THE FOLLOWING COMMENTS APPLY TO THE 9/23/2022
 RESUBMITTAL PACKET. ZONING HAS APPROVED ITS REVIEW WITH
 THE FOLLOWING CONDITION THAT THE MINOR CORRECTIONS
 BELOW ARE ADDRESSED PRIOR TO DAC (STAFF TO WORK WITH
 THE ARCHITECT/LANDSCAPE ARCHITECTS TO ADDRESS
 CORRECTIONS FOR CONSISTENCY) ***
  
  
 ARCHITECTURAL PLAN SET:
  
 1.) SHEET A0.01 - CORRECTIONS: A) PROVIDED CONDITIONAL
 SETBACK ON LEVELS 6-7: 33 FT. VS. 37'-4" (PROVIDED IN
 THE BUILDING SETBACK PAGE); B) OKEECHOBEE BLVD.
 TRANSPARENCY REQUIREMENT IS 66' (AT 50%) NOT 60'-10.5";
 C) VERIFY PUBLIC OPEN SPACE CALCULATION AT 1,964 SQ.
 FT. (DIFFERENT IN LANDSCAPE PLAN); D) PROVIDE PRIVATE
 OPEN SPACE CALCULATIONS.
  
 2.) SHEET A0.07 - CORRECTIONS: SHADING TO INCLUDE WHAT
 APPEARS TO BE A RESTROOM ON THE GROUND LEVEL FAR GROSS
 AREA CALCULATIONS; ENSURE CALCULATIONS ARE CORRECT ON
 ALL APPLICABLE SHEETS - PER 9/28 EMAIL FROM SANGHO -
 SQUARE FOOTAGE IS NOW 18,170 SQ. FT. (+340 SQ. FT.)
  
 3.) SHEET A1.03 - CORRECTIONS: CORRECTIONS NEED TO BE
 MADE TO THE PARKING GARAGE PLAN FOR CONSISTENCY.
  
 4.) SHEET A1.04 - CORRECTIONS: 46 PARKING SPACES
 PROVIDED - I COUNTED 41 STALLS (NOT 40) + 2 TANDEM + 3
 ADA (NOT 2).
  
  
  
 LANDSCAPE PLAN SET:
  
 1.) PUBLIC OPEN SPACE CALCULATIONS DO NOT MATCH
 ARCHITECTURAL SET (1,964 SQ. FT. VS. 1,940 SQ. FT. ON
 SHEET LP-4).
  
 2.) SHEET L-1 (ILLUSTRATED OVERALL SITE PLAN) DOES NOT
 MATCH THE DETAILS PROVIDED IN THE ARCHITECTURAL SET.
  
 3.) ONE CITY PLAZA BUILDING HEIGHT AND AMENITIES DECK
 (IN STORIES) IS INCONSISTENT WITH THE ARCHITECTURAL SET
 ON SHEETS: L-2, L-3 AND L-4.
  
  
  
  
  
  
  
  
  

Review Stop Z ZONING
Rev No 3 Status F Date 08-23-2022 Cont ID  
Sent By llouie Date 08-23-2022 Time   Rev Time 0.00
Received By llouie Date 08-23-2022 Time   Sent To  
Notes
2022-08-23 08:45:41GENERAL COMMENTS:
  
 1.) IT IS RECOMMENDED THAT THE APPLICANT HOLD OUTREACH
 MEETINGS WITH THE RESIDENTS OF ONE CITY PLAZA
 CONDOMINIUM, AS THE PROPOSED PROJECT WILL HAVE A DIRECT
 IMPACT ON THE ADJACENT RESIDENTIAL CONDO BUILDING.
  
 [STAFF RESPONSE: REPEAT COMMENT - IN PROGRESS.
 ACCORDING TO THE APPLICANT?S PPRC RESPONSE LETTER
 (8/12/22), THE APPLICANT IS AWARE THAT IT IS NECESSARY
 TO ENGAGE WITH THE NEIGHBOR PRIOR TO THE PROJECT
 PROCEEDING TO A DAC MEETING. THIS IS STILL IN PROGRESS.
 ONCE THE MEETING(S) HAVE BEEN HELD, THE APPLICANT WILL
 BE REQUIRED TO PROVIDE DOCUMENTATION/NECESSARY
 CORRESPONDENCE REGARDING THE MEETING(S).]
  
  
 2.) ALTHOUGH THE PROJECT IS WITHIN THE TRAFFIC
 CONCURRENCY EXCEPTION AREA (TCEA), A LETTER FROM THE
 PALM BEACH COUNTY TRAFFIC DIVISION IS STILL REQUIRED.
 PLEASE CONTACT THE PALM BEACH COUNTY TRAFFIC DIVISION
 AT (561) 684-4030 FOR INFORMATION ON HOW TO OBTAIN THE
 REQUIRED TRAFFIC LETTER.
  
 [STAFF RESPONSE: REPEAT COMMENT - IN PROGRESS.
 ACCORDING TO THE APPLICANT?S PPRC RESPONSE LETTER
 (8/12/22), THE APPLICANT ACKNOWLEDGES THE COMMENT AND
 HAS NOTED THAT THE TPS ANALYSIS IS CURRENTLY UNDER
 REVIEW AT PALM BEACH COUNTY. THIS LETTER IS REQUIRED
 PRIOR TO THE PROJECT PROCEEDING TO A DAC MEETING.]
  
  
 3.) A PREDETERMINATION LETTER FROM THE FLORIDA
 DEPARTMENT OF TRANSPORTATION (FDOT) SHALL BE REQUIRED
 FOR THE PROPOSED ACCESS POINTS AND/OR STREETSCAPE
 IMPROVEMENTS ALONG SOUTH DIXIE HWY, LAKEVIEW AVENUE AND
 OKEECHOBEE BOULEVARD (FDOT CONTROLLED ROWS). THIS
 PREDETERMINATION LETTER IS REQUIRED PRIOR TO THE
 SCHEDULING OF THIS APPLICATION FOR THE DOWNTOWN ACTION
 COMMITTEE (DAC) TO ENSURE THE ACCESS POINTS AND
 STREETSCAPE REQUIREMENTS ARE FEASIBLE.
  
 [STAFF RESPONSE: THANK YOU FOR PROVIDING THE FDOT
 PREDETERMINATION LETTER; HOWEVER, THE LETTER FROM FDOT,
 DATED 8/4/2022, HAS INCORRECT INFORMATION ON THE UNIT
 COUNT AND COMMERCIAL BUILDING SQUARE FOOTAGES FOR THE
 PROJECT. THIS MUST BE CORRECTED FOR CONSISTENCY. PLEASE
 CONTACT FDOT TO REVISE LETTER WITH THE CORRECT
 BUILDING/UNIT CALCULATIONS. THE LETTER FROM FDOT IS
 REQUIRED PRIOR TO THE PROJECT PROCEEDING TO A DAC
 MEETING.]
  
  
 4.) PROVIDE A LETTER ENSURING FAA COMPLIANCE (A
 DETERMINATION OF NO HAZARD) IN REGARD TO THE HEIGHT OF
 ANY TOWERS OR STRUCTURES WITHIN THE DESIGNATED FLIGHT
 PATHS.
  
 [STAFF RESPONSE: IT WAS BROUGHT TO STAFF'S ATTENTION
 THAT THE APPLICANT SHOULD OBTAIN THE FAA COMPLIANCE
 LETTER. AN EMAIL TO THE APPLICANT WENT OUT ON 8/11/2022
 TO INFORM THE APPLICANT OF THE LETTER REQUIREMENT.
 APPLICANT IS AWARE THE PROCESS TO OBTAIN THE COMPLIANCE
 LETTER IS REQUIRED. PLEASE START PROCESS AND/OR
 FOLLOW-UP WITH FAA ASAP.]
  
  
 5.) PLEASE ENSURE ALL PLAN SHEETS MATCH FOR CONSISTENCY
 (I.E. SITE PLAN, LANDSCAPE PLAN, CIVIL PLANS, ETC.)
  
 [STAFF RESPONSE: NOT FULLY ADDRESSED. THERE ARE STILL
 INCONSISTENCIES IN THE PLAN SET. ANY CHANGES MADE TO
 THE PLANS REQUIRES ALL PLAN SHEETS TO BE UPDATED FOR
 CONSISTENCY. PLANNING STAFF WILL WORK WITH THE
 ARCHITECT AND LANDSCAPE ARCHITECT TO IDENTIFY/ADDRESS
 THESE INCONSISTENCIES.]
  
  
 6.) AS DISCUSSED WITH THE ARCHITECT ON 7/19/2022, THE
 PROJECT CALCULATIONS WILL NEED TO BE REVISED/CORRECTED
 THROUGHOUT THE PLAN SHEETS FOR ACCURACY. THE ARCHITECT
 ACKNOWLEDGES THESE INCONSISTENCIES WITH THE PROJECT
 NUMBERS AND WILL ADDRESS (THE ARCHITECT SHOULD ALSO
 SCHEDULE A TIME TO DISCUSS THE SPECIFIC INCONSISTENCIES
 WITH STAFF): A) BUILDING AREA CALCULATIONS. B) FAR
 CALCULATIONS AND DIAGRAMS.
  
 [STAFF RESPONSE: PLEASE HAVE THE ARCHITECT CONTACT
 STAFF DIRECTLY TO CLARIFY THE CALCULATIONS.]
  
  
 7.) PLEASE PROVIDE MORE INFORMATION ON WHICH OPTION THE
 PROJECT WILL SATISFY PER S.94-111(T)(5) OF THE ZLDRS,
 SINCE THE PROJECT WILL EXCEED THE SOFT MAXIMUM (BUT AT
 UNDER 50%). IT IS ASSUMED THAT THE APPLICANT WILL
 COMPLY WITH THE TRANSPORTATION DEMAND MANAGEMENT (TDM)
 REQUIREMENTS, BUT STAFF WILL NEED THE INFORMATION ON
 HOW THE PROJECT WILL ?EARN? THE ADDITIONAL PARKING
 SPACES (ABOVE THE SOFT MAX). IT APPEARS THAT THE
 PROJECT EXCEEDS THE SOFT MAXIMUM BY 60 PARKING SPACES
 (PLEASE CHECK CALCULATIONS). THERE MUST BE A CLEAR
 UNDERSTANDING OF HOW THIS WILL BE ACHIEVED BY DAC.
  
  
  
 STREETSCAPE REQUIREMENTS:
  
 1.) A SIDEWALK WITH A MINIMUM OF 8 FT. CLEAR WIDTH
 SHALL BE PROVIDED ALONG THE BUILDING FRONTAGE. PRIVATE
 SIDEWALK WHICH SERVE AS AN EXTENSION OF THE PUBLIC
 SIDEWALK SHALL COMPLY WITH THE STREETSCAPE
 REQUIREMENTS, SHALL MATCH THE PUBLIC SIDEWALK IN DESIGN
 AND MATERIAL, AND SHALL PROVIDE A SEAMLESS TRANSITION
 BETWEEN THE TWO. PLEASE DEMONSTRATE IN THE PLANS AND
 PROVIDE DIMENSIONS TO ILLUSTRATE COMPLIANCE WITH THE
 ZLDRS.
  
 [STAFF RESPONSE: DIMENSIONS ARE NOW PROVIDED IN THE
 SITE PLAN (SHEET C-103); HOWEVER, THE 8 FT. CLEAR
 SIDEWALK REQUIREMENT DOES NOT APPEAR TO HAVE BEEN MET
 ALONG SOUTH DIXIE HIGHWAY. A LANDSCAPE PLANTER SEEMS TO
 INTERRUPT THE 8 FT. CLEARANCE. WHAT IS THE PURPOSE OF
 THE PLANTER ALONG SOUTH DIXIE HIGHWAY? CAN THIS BE
 SHIFTED OR ELIMINATED TO RESOLVE THE ISSUE?
 ADDITIONALLY, PLEASE CHECK DIMENSIONS, THE SIDEWALK
 DIMENSIONS ALSO CONFLICT WITH THE DIMENSIONS PROVIDED
 IN THE LANDSCAPE PLAN (WHICH SHOWS THE 8 FT. CLEARANCE
 HAS BEEN MET).).
  
  
 2.) REQUIRED BICYCLE PARKING IS NOW PROVIDED ALONG THE
 STREET FRONTAGE; HOWEVER, THE CALCULATIONS, THE
 DEPICTION IN THE PLANS AND THE DETAIL ARE ALL
 INCONSISTENT. PLEASE ADDRESS.
  
 [STAFF RESPONSE: THERE ARE STILL ISSUES WITH THE
 BICYCLE PARKING CALCULATIONS. STAFF WOULD NEED TO SEE A
 BREAKDOWN OF PARKING PROVIDED FOR COMMERCIAL (INCLUDING
 HOTEL) AND RESIDENTIAL USES SEPARATELY TO DETERMINE IF
 THE CALCULATIONS AND REQUIREMENT CORRECTLY AND
 INCOMPLIANCE WITH THE STANDARDS FOR BICYCLE PARKING IN
 S.94-111 OF THE ZLDRS. ADDITIONALLY, WHERE IS THE
 BICYCLE RACK DETAIL(S) FOR THE PROJECT? THE DETAIL MUST
 BE INCLUDED IN THE PLAN SET, AS THE CITY HAS DESIGN
 STANDARDS FOR BICYCLE PARKING. PLEASE PROVIDE TO
 DEMONSTRATE COMPLIANCE WITH THE ZLDRS.]
  
  
 3.) DRIVEWAYS AND CURB CUTS SHALL BE DESIGNED TO
 MINIMIZE THE NEGATIVE IMPACT IN THE PEDESTRIAN PATH OF
 TRAVEL. DRIVEWAYS SHALL MAINTAIN THE SIDEWALK
 ELEVATION. PLEASE PROVIDE A SECTION PARALLEL TO THE
 STREET TO DEMONSTRATE COMPLIANCE. [ZLDR
 S.94-113(D)(10)]
  
 [STAFF RESPONSE: PARTIALLY ADDRESSED. ALL PLANS SHALL
 MATCH FOR CONSISTENCY. CURBS ARE STILL SHOWN ALONG
 LAKEVIEW AVENUE WHERE THE DRIVEWAY MEETS THE SIDEWALK
 ELEVATION.]
  
  
 4.) CURB CUTS, PARKING ENTRANCES, EXITS AND DRIVEWAYS
 SHALL BE SEPARATED AT LEAST 10 FT. TO MINIMIZE THE
 IMPACT OF A CONTIGUOUS CURB CUTS ON THE PEDESTRIAN
 ENVIRONMENT. THE DIMENSION FOR THE CURB CUT SEPARATION
 AT THE SOUTH INGRESS/EGRESS POINT HAS NOT BEEN PROVIDED
 TO DEMONSTRATE COMPLIANCE. [ZLDR S.94-111(O)]
  
 [STAFF RESPONSE: PARTIALLY ADDRESSED. CURB CUT
 SEPARATION MUST EXTEND INTO THE DRIVEWAY APRON TO
 PROVIDE ADEQUATE SAFETY FOR PEDESTRIANS (PURPOSE OF THE
 SEPARATION)].
  
  
 ARCHITECTURAL COMMENTS:
  
 1.) THE MATERIAL USED ON THE BUILDING IS NOW NOTED IN
 THE ARCHITECTURAL ELEVATIONS. PLEASE NOTE THAT PER
 TABLE IV-4, TINTED OR REFLECTIVE GLASS IS NOT
 PERMITTED. THE ELEVATIONS INDICATE THAT REFLECTIVE
 GLASS WILL BE USED. PLEASE ADDRESS.
  
 2.) STAFF IS REQUESTING A PHONE CONVERSATION TO DISCUSS
 THE PROPOSED WALL TREATMENT ON THE BLANK FA?ADE ALONG
 THE INTERIOR SIDE SETBACK. THE PROPOSED TREATMENT DOES
 NOT APPEAR TO BE CONSISTENT WITH THE DMP CODE FOR BLANK
 WALL FA?ADE TREATMENT. PLEASE WORK WITH STAFF TO
 ADDRESS THIS CONCERN.
  
 3.) PER HISTORIC'S EMAIL DATED 8/9/22, PLEASE SHOW
 DETAIL AND/OR LOCATION OF THE PILASTERS AND WOOD BEANS
 IN THE PROJECT.
  
  
 INSTRUCTIONS FOR RESUBMITTAL:
  
 * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 * WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF FOUR
 (4) PAPER COPIES - 2 SETS IN FULL COLOR, ONE REDUCED
 COPY IN 11 INCHES X 17 INCHES, AND AN ELECTRONIC COPY
 OF ALL PLANS AND DOCUMENTS.
  
 * ANY CHANGES ON THE RESUBMITTED PLANS MAY RESULT IN
 ADDITIONAL COMMENTS.
  
 * PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE. [STAFF
 NOTE: NO FEE IS REQUIRED FOR THE NEXT RESUBMITTAL ? THE
 7/5/22 PLANS SHOW THE APPLICANT IS WORKING WITH STAFF
 TO ADDRESS OUTSTANDING COMMENTS.]
  
 * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE
 QUESTIONS.
  
  
 CONDITIONS:
  
 * THE PROJECT SHALL OBTAIN LEED CERTIFICATION FROM THE
 LEADERSHIP ON ENVIRONMENTAL DESIGN (LEED) OR A SIMILAR
 NATIONALLY ACCREDITED ORGANIZATION. ALL REQUIREMENTS
 AND TIMEFRAMES SHALL BE MET PURSUANT TO SEC.
 94135(E.)(2.)(5) OF THE ZONING AND LAND DEVELOPMENT
 REGULATIONS (ZLDRS).
  
 * THE PROJECT EXCEEDS THE SOFT MAXIMUM REQUIREMENT FOR
 PARKING (BUT NOT OVER 50%). A CONTRIBUTION TO THE
 TRANSIT OPERATION FUND WILL BE REQUIRED. [ZLDR
 S.94-111]
  
 * A RESTRICTIVE COVENANT, OUTLINING THE OPERATION OF
 THE PROPOSED MECHANICAL PARKING SHALL BE EXECUTED ON
 CITY APPROVED FORMS AND RECORDED IN THE PUBLIC RECORDS.
  
 * THE PROJECT SHALL COMPLY WITH THE DELIVERY/SERVICE
 VEHICLES OPERATION, OVERALL CURBSIDE MANAGEMENT AND
 VALET OPERATIONS ONSITE PER THE ?320 LAKEVIEW -
 DELIVERY MANAGEMENT AND VALET OPERATIONS SUMMARY, WEST
 PALM BEACH, FLORIDA, KIMLEY-HORN #140998000,? PREPARED
 ON AUGUST 12, 2022, BY CHRISTOPHER W. HEGGEN, P.E., OF
 KIMLEY-HORN AND ASSOCIATES.
  

Review Stop Z ZONING
Rev No 2 Status F Date 07-20-2022 Cont ID  
Sent By llouie Date 07-20-2022 Time   Rev Time 0.00
Received By llouie Date 07-20-2022 Time   Sent To  
Notes
2022-07-20 15:43:08GENERAL COMMENTS:
  
 1.) IT IS RECOMMENDED THAT THE APPLICANT HOLD OUTREACH
 MEETINGS WITH THE RESIDENTS OF ONE CITY PLAZA
 CONDOMINIUM, AS THE PROPOSED PROJECT WILL HAVE A DIRECT
 IMPACT ON THE ADJACENT RESIDENTIAL CONDO BUILDING.
  
 [STAFF RESPONSE: IN PROGRESS. ACCORDING TO THE
 APPLICANT?S PPRC RESPONSE LETTER (7/5/22), THE
 APPLICANT IS AWARE THAT IT IS NECESSARY TO ENGAGE WITH
 THE NEIGHBORS PRIOR TO THE PROJECT PROCEEDING TO A DAC
 MEETING.]
  
 2.) ALTHOUGH THE PROJECT IS WITHIN THE TRAFFIC
 CONCURRENCY EXCEPTION AREA (TCEA), A LETTER FROM THE
 PALM BEACH COUNTY TRAFFIC DIVISION IS STILL REQUIRED.
 PLEASE CONTACT THE PALM BEACH COUNTY TRAFFIC DIVISION
 AT (561) 684-4030 FOR INFORMATION ON HOW TO OBTAIN THE
 REQUIRED TRAFFIC LETTER.
  
 [STAFF RESPONSE: IN PROGRESS. ACCORDING TO THE
 APPLICANT'S PPRC RESPONSE LETTER (7/5/22), THE TPS
 ANALYSIS IS CURRENTLY UNDER REVIEW AT PALM BEACH
 COUNTY. THIS LETTER IS REQUIRED PRIOR TO THE PROJECT
 PROCEEDING TO A DAC MEETING.)
  
 3.) A PREDETERMINATION LETTER FROM THE FLORIDA
 DEPARTMENT OF TRANSPORTATION (FDOT) SHALL BE REQUIRED
 FOR THE PROPOSED ACCESS POINTS AND/OR STREETSCAPE
 IMPROVEMENTS ALONG SOUTH DIXIE HWY, LAKEVIEW AVENUE AND
 OKEECHOBEE BOULEVARD (FDOT CONTROLLED ROWS). THIS
 PREDETERMINATION LETTER IS REQUIRED PRIOR TO THE
 SCHEDULING OF THIS APPLICATION FOR THE DOWNTOWN ACTION
 COMMITTEE (DAC) TO ENSURE THE ACCESS POINTS AND
 STREETSCAPE REQUIREMENTS ARE FEASIBLE.
  
 [STAFF RESPONSE: IN PROGRESS. ACCORDING TO THE
 APPLICANT'S PPRC RESPONSE LETTER (7/5/22), A
 PRE-APPLICATION MEETING WITH FDOT WAS HELD ON 5/19/22
 AND A LETTER WILL BE PROVIDED TO STAFF UPON RECEIPT. A
 LETTER FROM FDOT STATING THAT THE PROPOSED IMPROVEMENTS
 ALONG THE FDOT CONTROLLED ROWS IS REQUIRED PRIOR TO THE
 PROJECT PROCEEDING TO A DAC MEETING.]
  
 4.) PLEASE ENSURE ALL PLAN SHEETS MATCH FOR CONSISTENCY
 (I.E. SITE PLAN, LANDSCAPE PLAN, CIVIL PLANS, ETC.)
  
 [STAFF RESPONSE: NOT ADDRESSED. THE ARCHITECT IS AWARE
 THAT THERE ARE STILL INCONSISTENCIES WITH THE PLANS
 WITHIN THE PLAN SET. THESE INCONSISTENCIES WILL BE
 ADDRESSED.]
  
 5.) ALL BUILDING SETBACKS SHALL BE PROVIDED ON SHEET
 A0.04 (BUILDING SETBACKS) TO DEMONSTRATE CONSISTENCY
 WITH THE MINIMUM REQUIREMENTS OF THE ZLDRS. SOME
 BUILDING SETBACKS APPEAR TO BE REMOVED/NOT INCLUDED IN
 THE LATEST PLAN SET.
  
 6.) IN THE ARCHITECTURAL PLAN PACKET, ON THE COVER
 SHEET/TABLE OF CONTENTS: A) SHEETS FOR ARCHITECTURAL
 RENDERINGS ARE MISLABELED. B) CORRECT PLAN SHEET PAGES
 FOR LEVELS 19 THROUGH ROOFTOP LEVEL PLAN.
  
 7.) AS DISCUSSED WITH THE ARCHITECT ON 7/19/2022, THE
 PROJECT CALCULATIONS WILL NEED TO BE REVISED/CORRECTED
 THROUGHOUT THE PLAN SHEETS FOR ACCURACY. THE ARCHITECT
 ACKNOWLEDGES THESE INCONSISTENCIES WITH THE PROJECT
 NUMBERS AND WILL ADDRESS (THE ARCHITECT SHOULD ALSO
 SCHEDULE A TIME TO DISCUSS THE SPECIFIC INCONSISTENCIES
 WITH STAFF): A) BUILDING AREA CALCULATIONS. B) FAR
 CALCULATIONS AND DIAGRAMS. C) ACTIVE USE CALCULATIONS.
 D) LANDSCAPE PLAN OPEN SPACE CALCULATIONS AND DEPICTION
 VS. SITE PLANS. E) PARKING CALCULATIONS VS. SITE PLAN.
  
 8.) AS DISCUSSED WITH THE ARCHITECT ON 7/19/22, STAFF
 WILL NEED TO VERIFY WITH URBAN DESIGN IF THE DOG RUN
 AREA MEETS THE FENESTRATION REQUIREMENTS OF THE DAC
 CODE. STAFF WILL LET THE APPLICANT KNOW AS SOON AS
 FEEDBACK IS PROVIDED.
  
  
 SITE PLAN COMMENTS:
  
 1.) THE BUILDING FRONTAGE ALONG OKEECHOBEE BOULEVARD
 WHERE THERE IS A PLANAR BREAK APPEARS TO BE OUTSIDE OF
 THE SETBACK RANGE. PLEASE ADDRESS OR REQUEST A VARIANCE
 FROM THE REQUIREMENT.
  
 2.) GROUND LEVEL ACTIVE USE REQUIREMENT ALONG
 OKEECHOBEE BOULEVARD HAS NOT BEEN MET. A MINIMUM OF
 131.8 LINEAR FEET (65%) OF ACTIVE USE IS REQUIRED. ONLY
 121.75 LINEAR FEET HAS BEEN PROVIDED ALONG OKEECHOBEE
 BLVD. [ZLDR S.94-135, TABLE IV-70]
  
 3.) PROVIDE THE ROOFTOP STORAGE AREA CALCULATIONS
 (HURRICANE EMERGENCY STORAGE SPACE FOR ROOFTOP
 AMENITIES AS NOTED IN THE APPLICANT'S PPRC RESPONSE
 LETTER - 7/5/22). PER S.94-109, THE STORAGE AREA IS
 PERMITTED AS LONG AS IT DOES NOT EXCEED 30%. PLEASE
 DEMONSTRATE CONSISTENCY WITH THE ZLDRS.
  
  
 PARKING REQUIREMENTS:
  
 1.) PLEASE CHECK THE PARKING CALCULATIONS. THERE SEEMS
 TO BE ERRORS IN THE CALCULATIONS (I.E. PARKING COUNT
 DOES NOT MATCH THE PARKING PROVIDED IN THE SITE PLAN).
 PLEASE CORRECT ANY ERRORS FOR CONSISTENCY.
  
 [STAFF RESPONSE: NOT ADDRESSED. INCONSISTENCIES WITH
 THE PARKING CALCULATIONS AND PARKING DEPICTED IN THE
 PLANS HAVE NOT BEEN ADDRESSED. THE ARCHITECT IS
 REQUESTED TO CONTACT STAFF TO GO OVER THE SPECIFIC
 INCONSISTENCIES TO ENSURE THE ERRORS ARE ADDRESSED
 CORRECTLY.]
  
 2.) THE APPLICANT'S PPRC RESPONSE LETTER (7/5/22)
 STATES THAT A DELIVERY MANAGEMENT, CURBSIDE MANAGEMENT
 AND VALET QUEUING /OPERATIONS EVALUATION HAS BEEN
 PREPARED AND IS INCLUDED WITH THE RESUBMITTAL PACKET;
 HOWEVER, THIS DOCUMENT CANNOT BE FOUND. PLEASE CLARIFY
 AND/OR PROVIDE AS THIS IS A REQUIRED DOCUMENT FOR THE
 PROJECT.
  
 3.) THE PROJECT SHALL COMPLY WITH THE MINIMUM LOADING
 REQUIREMENTS IN ZLDR S.94-485. PLEASE PROVIDE
 CALCULATIONS AND DIMENSIONS TO DEMONSTRATE COMPLIANCE.
  
 [STAFF RESPONSE: NOT ADDRESSED. LOADING ZONE
 CALCULATIONS AND DIMENSION HAVE NOT BEEN PROVIDED IN
 THE PLANS. BASED ON STAFF?S CALCULATIONS, A MINIMUM OF
 THREE 10 FT. X 50 FT. LOADING SPACES ARE REQUIRED FOR
 THE PROJECT. IF THE APPLICANT BELIEVES LESS ARE
 REQUIRED, THE CALCULATIONS WILL NEED TO BE PROVIDED TO
 DEMONSTRATE COMPLIANCE.]
  
  
 STREETSCAPE REQUIREMENTS:
  
 1.) A SIDEWALK WITH A MINIMUM OF 8 FT. CLEAR WIDTH
 SHALL BE PROVIDED ALONG THE BUILDING FRONTAGE. PRIVATE
 SIDEWALK WHICH SERVE AS AN EXTENSION OF THE PUBLIC
 SIDEWALK SHALL COMPLY WITH THE STREETSCAPE
 REQUIREMENTS, SHALL MATCH THE PUBLIC SIDEWALK IN DESIGN
 AND MATERIAL, AND SHALL PROVIDE A SEAMLESS TRANSITION
 BETWEEN THE TWO. PLEASE DEMONSTRATE IN THE PLANS AND
 PROVIDE DIMENSIONS TO ILLUSTRATE COMPLIANCE WITH THE
 ZLDRS.
  
 [STAFF RESPONSE: ALTHOUGH DIMENSIONS HAVE BEEN PROVIDED
 IN SHEET C-100 OF THE CIVIL PLANS, STAFF IS REQUESTING
 THAT THE DIMENSIONS ARE ALSO PROVIDED IN THE SITE
 PLAN.]
  
 2.) REQUIRED BICYCLE PARKING IS NOW PROVIDED ALONG THE
 STREET FRONTAGE; HOWEVER, THE CALCULATIONS, THE
 DEPICTION IN THE PLANS AND THE DETAIL ARE ALL
 INCONSISTENT. PLEASE ADDRESS.
  
 3.) DRIVEWAYS AND CURB CUTS SHALL BE DESIGNED TO
 MINIMIZE THE NEGATIVE IMPACT IN THE PEDESTRIAN PATH OF
 TRAVEL. DRIVEWAYS SHALL MAINTAIN THE SIDEWALK
 ELEVATION. PLEASE PROVIDE A SECTION PARALLEL TO THE
 STREET TO DEMONSTRATE COMPLIANCE. [ZLDR
 S.94-113(D)(10)]
  
 [STAFF RESPONSE: PARTIALLY ADDRESSED. ALTHOUGH THE
 CIVIL PLAN SHOWS THE SIDEWALK CONNECTION AT THE
 DRIVEWAY IS CURBLESS, STAFF IS REQUESTING THE SAME
 CONSISTENCY IN THE SITE PLAN. ALSO, THE REQUESTED
 SECTION DETAIL WAS NOT PROVIDED.]
  
 4.) CURB CUTS, PARKING ENTRANCES, EXITS AND DRIVEWAYS
 SHALL BE SEPARATED AT LEAST 10 FT. TO MINIMIZE THE
 IMPACT OF A CONTIGUOUS CURB CUTS ON THE PEDESTRIAN
 ENVIRONMENT. THE DIMENSION FOR THE CURB CUT SEPARATION
 AT THE SOUTH INGRESS/EGRESS POINT HAS NOT BEEN PROVIDED
 TO DEMONSTRATE COMPLIANCE. [ZLDR S.94-111(O)]
  
  
 ARCHITECTURAL COMMENTS:
  
 1.) IT IS NOTED IN THE APPLICANT'S PPRC RESPONSE LETTER
 (7/5/22) THAT A "GREEN WALL TREATMENT" IS PROPOSED ON
 THE EAST WALLS. PLEASE CLARIFY WHAT THIS MEANS AND NOTE
 IN THE PLANS.
  
 2.) IT IS NOT CLEAR TO WHAT THE REQUESTED ARCHITECTURAL
 TREATMENT WILL BE BETWEEN THE PROPOSED BUILDING AND THE
 NEIGHBORING ONE CITY PLAZA. THE PROJECT NOW PROPOSES A
 7 FT. SETBACK BETWEEN BUILDINGS AT OKEECHOBEE BOULEVARD
 AND LAKEVIEW AVENUE (MIDDLE INTERIOR PROPOSES A 0 FT.
 SETBACK). STAFF HAD SPOKE TO THE ARCHITECT AND
 SUGGESTED A FAUX FACADE/WALL THE HEIGHT OF THE ENTIRE
 PODIUM TO PROVIDE SOME CONTINUITY BETWEEN BUILDINGS.
  
  
 SIGNAGE:
  
 1.) WILL THERE BE ANY SIGNAGE PROPOSED FOR THIS
 PROJECT? IF SO, PLEASE PROVIDE THE INFORMATION ON THE
 PROPOSED SIGNAGE. IF THE PROJECT SIGNAGE HAS YET TO BE
 DETERMINED, A NOTE STATING THAT ALL PROJECT SIGNAGE
 SHALL COMPLY WITH SEC. 94-110, OF THE ZONING AND LAND
 DEVELOPMENT REGULATIONS (ZLDRS) WILL BE REQUIRED IN THE
 PLANS.
  
 [STAFF RESPONSE: THE APPLICANT'S PPRC RESPONSE LETTER
 (7/5/22) STATES THAT A COMPLIANCE NOTE HAS BEEN ADDED
 IN THE PLANS; HOWEVER, THIS NOTE COULD NOT BE FOUND.
 THE RESPONSE LETTER ALSO STATES THAT THE NOTE COULD BE
 FOUND ON SHEET C-100 (ENGINEERING PLANS) ? THE NOTE IS
 MORE APPROPRIATE IN THE ARCHITECTURAL PLANS.]
  
  
  
 INSTRUCTIONS FOR RESUBMITTAL:
  
 * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 * WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF FOUR
 (4) PAPER COPIES, ONE REDUCED COPY IN 11 INCHES X 17
 INCHES, AND AN ELECTRONIC COPY OF ALL PLANS AND
 DOCUMENTS.
  
 * ANY CHANGES ON THE RESUBMITTED PLANS MAY RESULT IN
 ADDITIONAL COMMENTS.
  
 * PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE. [STAFF
 NOTE: NO FEE IS REQUIRED FOR THE NEXT RESUBMITTAL ? THE
 7/5/22 PLANS SHOW THE APPLICANT IS WORKING WITH STAFF
 TO ADDRESS OUTSTANDING COMMENTS.]
  
 * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE
 QUESTIONS.
  
  
 CONDITIONS:
  
 * THE PROJECT SHALL OBTAIN LEED CERTIFICATION FROM THE
 LEADERSHIP ON ENVIRONMENTAL DESIGN (LEED) OR A SIMILAR
 NATIONALLY ACCREDITED ORGANIZATION. ALL REQUIREMENTS
 AND TIMEFRAMES SHALL BE MET PURSUANT TO SEC.
 94135(E.)(2.)(5) OF THE ZONING AND LAND DEVELOPMENT
 REGULATIONS (ZLDRS).
  
 * THE PROJECT EXCEEDS THE SOFT MAXIMUM REQUIREMENT FOR
 PARKING (BUT NOT OVER 50%). A CONTRIBUTION TO THE
 TRANSIT OPERATION FUND WILL BE REQUIRED. [ZLDR
 S.94-111]
  
 * A RESTRICTIVE COVENANT, OUTLINING THE OPERATION OF
 THE PROPOSED MECHANICAL PARKING SHALL BE EXECUTED ON
 CITY APPROVED FORMS AND RECORDED IN THE PUBLIC RECORDS.
  
  
  

Review Stop Z ZONING
Rev No 1 Status F Date 06-08-2022 Cont ID  
Sent By llouie Date 06-08-2022 Time   Rev Time 0.00
Received By llouie Date 06-08-2022 Time   Sent To  
Notes
2022-06-08 08:22:40GENERAL COMMENTS:
  
 1.) IT IS RECOMMENDED THAT THE APPLICANT HOLD OUTREACH
 MEETINGS WITH THE RESIDENTS OF ONE CITY PLAZA
 CONDOMINIUM, AS THE PROPOSE PROJECT WILL HAVE A DIRECT
 IMPACT ON THE ADJACENT RESIDENTIAL CONDO BUILDING.
  
 2.) ALTHOUGH THE PROJECT IS WITHIN THE TRAFFIC
 CONCURRENCY EXCEPTION AREA (TCEA), A LETTER FROM THE
 PALM BEACH COUNTY TRAFFIC DIVISION, IS STILL REQUIRED.
 PLEASE CONTACT THE PALM BEACH COUNTY TRAFFIC DIVISION
 AT (561) 684-4030 FOR INFORMATION ON HOW TO OBTAIN THE
 REQUIRED TRAFFIC LETTER.
  
 3.) A PREDETERMINATION LETTER FROM THE FLORIDA
 DEPARTMENT OF TRANSPORTATION (FDOT) SHALL BE REQUIRED
 FOR THE PROPOSED ACCESS POINTS AND/OR STREETSCAPE
 IMPROVEMENTS ALONG SOUTH DIXIE HWY, LAKEVIEW AVENUE AND
 OKEECHOBEE BOULEVARD (FDOT CONTROLLED ROWS). THIS
 PREDETERMINATION LETTER IS REQUIRED PRIOR TO THE
 SCHEDULING OF THIS APPLICATION FOR THE DOWNTOWN ACTION
 COMMITTEE (DAC) TO ENSURE THE ACCESS POINTS AND
 STREETSCAPE REQUIREMENTS ARE FEASIBLE.
  
 4.) ACCORDING TO THE PARKING CALCULATIONS PROVIDED IN
 THE PLAN SHEETS, THE SOFT MAXIMUM HAS BEEN EXCEEDED
 (BUT NOT OVER 50%), AND THEREFORE, A CONTRIBUTION TO
 THE TRANSIT OPERATION FUND WILL BE REQUIRED. [ZLDR
 S.94-111]
  
 5.) ALL NEW DEVELOPMENT WITHIN THE OBD SHALL OBTAIN
 LEED CERTIFICATION FROM THE LEADERSHIP ON ENVIRONMENTAL
 DESIGN (LEED) OR A SIMILAR NATIONALLY ACCREDITED
 ORGANIZATION. ALL REQUIREMENTS AND TIMEFRAMES SHALL BE
 MET PURSUANT TO SEC. 941-35(E.)(2.)(5.).
  
 6.) ALL BUILDING SETBACKS SHALL BE MEASURED FROM THE
 BACK OF CURB. PLAN SHEETS SHOWS THAT THE SETBACK
 DIMENSIONS WERE TAKEN FROM THE FRONT OF THE CURB, WHICH
 IS INCORRECT. PLEASE ADDRESS FOR CONSISTENCY.
  
 7.) PLEASE ENSURE ALL PLAN SHEETS MATCH FOR CONSISTENCY
 (I.E. SITE PLAN, LANDSCAPE PLAN, CIVIL PLANS, ETC.).
  
 8.) AT LEAST ONE HARD COPY SET OF FULL COLORED
 PLANS/DRAWINGS (I.E. ELEVATIONS, FAR CALCULATIONS
 SHEETS, ETC.) SHALL BE REQUIRED IN ALL FUTURE
 RESUBMITTALS.
  
  
 SITE PLAN COMMENTS:
  
 1.) THE ENTIRE BUILDING FRONTAGE ALONG SOUTH DIXIE
 HIGHWAY, INCLUDING THE GROUND LEVEL, SHALL BE PROVIDED
 WITHIN THE MINIMUM (16 FEET) AND MAXIMUM (30 FEET)
 BUILDING SETBACK RANGE. THE PROPOSED BUILDING FRONTAGE
 ALONG SOUTH DIXIE HIGHWAY (A PRIMARY PEDESTRIAN STREET)
 APPEARS TO BE LOCATED OUTSIDE OF THIS SETBACK RANGE.
 THIS CAN BE ADDRESSED BY RECONFIGURING THE HOTEL LOBBY
 SPACE TO MEET THE REQUIRED BUILDING SETBACKS. [ZLDR
 S.94-135, TABLE IV-70]
  
 2.) THE PROPOSED PUBLIC OPEN SPACE (PLAZA) AREA SHALL
 ABUT ACTIVE USES ON A MINIMUM OF TWO (2) SIDES. THIS
 REQUIREMENT IS CURRENTLY NOT MET; THE PLAZA AREA
 CURRENTLY ABUTS ACTIVE USE ONLY ON ONE (1) SIDE. [ZLDR
 S.94-108, TABLE IV-7]
  
 3.) THE STAIRWELL LOCATED WITHIN THE BUILDING ALONG
 LAKEVIEW AVENUE, AT THE NORTHWEST CORNER OF THE GROUND
 LEVEL CAFE SHALL BE RELOCATED AWAY FROM THE CORNER.
 EFFORT SHALL BE MADE TO CONCEAL THE STAIRWELL FROM THE
 BUILDING FRONTAGE BY ACTIVE USES ALONG THIS PROMINENT
 PEDESTRIAN STREET FRONTAGE (I.E. PUSH THE STAIRWELL
 BACK INTO THE SPACE).
  
 4.) THE CONDITIONAL SETBACK (MINIMUM OF 31 FT.) SHALL
 APPLY TO ALL STORIES ABOVE THE 5TH STORY TO CONCEAL ALL
 PARKING AND/OR NON-ACTIVE USE LINERS. THIS REQUIREMENT
 HAS NOT BEEN MET ALONG LAKEVIEW AVENUE. [ZLDR S.94-135,
 TABLE IV-70]
  
 5.) THE BUILDING FOOTPRINT CANNOT EXCEED 60% AT THE 6TH
 AND 7TH LEVELS, UNLESS IN COMPLIANCE WITH THE
 CONDITIONAL SETBACK. THE CONDITIONAL SETBACK
 REQUIREMENT HAS NOT BEEN MET TO ALLOW FOR A GREATER
 BUILDING FOOTPRINT FOR PARKING BEYOND THE MAXIMUM 60%
 FOR THESE LEVELS. [ZLDR S.94-135, TABLE IV-70]
  
 6.) MINIMUM ACTIVE USE REQUIREMENTS ALONG THE STREET
 FRONTAGES CANNOT BE VERIFIED. PLEASE PROVIDE DIMENSIONS
 (I.E. LF) FOR ALL ACTIVE USE AREAS SO THAT STAFF CAN
 VERIFY THE CALCULATIONS. ALSO, PLEASE NOTE THAT
 NON-ACTIVE USES, SUCH AS MAILROOMS, STORAGE, ETC.,
 SHALL NOT BE COUNTED TOWARDS THE MINIMUM ACTIVE USE
 REQUIREMENT; SOME OF THESE USES HAVE BEEN INCLUDED
 TOWARDS THE ACTIVE USE REQUIREMENT CALCULATIONS WHICH
 IS INCORRECT. [ZLDR S.94-135, TABLE IV-70]
  
 7.) THE MINIMUM ACTIVE USE LINER DEPTH FOR COMMERCIAL
 USES IS 20 FT. ABOVE THE GROUND LEVEL. THERE ARE
 EXECUTIVE MANAGEMENT TEAM HOTEL OFFICES ALONG THE
 LAKEVIEW FRONTAGE THAT DOES NOT COMPLY WITH THIS
 MINIMUM REQUIREMENT (PROVIDED IS 15 FT.). [ZLDR
 S.94-135, TABLE IV-70]
  
 8.) PLEASE PROVIDE THE DIMENSIONS FOR ALL AREAS IN THE
 ACTIVE USE LINER DEPTH CALCULATIONS TO DEMONSTRATE
 COMPLIANCE WITH THE ZLDRS. [ZLDR S.94-135, TABLE IV-70]
  
 9.) THERE ARE SOME ABBREVIATED NOTES THAT STAFF IS
 UNFAMILIAR WITH (I.E. FCC, BOH, T, RVG, FO, PR, HK, L,
 ETC.) TO DEFINE SPACES IN THE PLAN SHEETS. PLEASE
 CLARIFY WHAT THESE SPACES ARE IN THE PLANS SO THAT
 STAFF CAN DETERMINE IF THESE SPACES QUALIFY IN THE
 ACTIVE USE, FAR, ETC. CALCULATIONS.
  
 10.) PLEASE EXPLAIN THE ENGINEERING MANAGEMENT ROOM.
 STAFF NEEDS TO DETERMINE IF THIS SPACE IS CONSIDERED AN
 ACTIVE OR NON-ACTIVE USE. THIS SPACE SEEMS TO HAVE BEEN
 INCLUDED IN THE ACTIVE USE CALCULATIONS ALONG LAKEVIEW
 AVE. (LEVEL 3).
  
 11.) PLEASE EXPLAIN THE "DOG RUN" AREA. IT WOULD BE
 HELPFUL TO DESIGN THE SPACE WITH FURNISHINGS TO CONFIRM
 THAT THE SPACE IS NOT AN EMPTY SPACE WITHIN THE
 PROJECT.
  
 12.) WHAT TYPE OF STORAGE IS PROVIDED ON LEVELS 2
 THROUGH 7? PLEASE PROVIDE MORE INFORMATION/CLARIFY IN
 THE PLANS.
  
 13.) THE STORAGE AREA SHALL NOT BE PERMITTED ON THE
 ROOFTOP OF THE BUILDING. ACCORDING TO THE PLANS, AN
 ENCLOSED STORAGE AREA IS PROVIDED ON THE ROOFTOP.
 PLEASE ADDRESS. [ZLDR S.94-109, TABLE IV-5]
  
 14.) PLEASE CLEARLY LABEL/DEFINE ALL SPACES IN THE
 PLANS (I.E. BICYCLE STORAGE AREA).
  
 15.) PLEASE EXPLAIN THE BREAKDOWN OF BUILDING SQUARE
 FOOTAGE FOR RETAIL + RESTAURANT = 15,720 SQ. FT. THE
 CALCULATIONS DO NOT ADD UP.
  
 16.) FAR CALCULATIONS SHALL INCLUDE ALL FULLY ENCLOSED
 STORAGE SPACES (AIR CONDITIONED AND NON-AIR
 CONDITIONED), STAIRS AND ELEVATORS, ENCLOSED AREAS ON
 THE ROOFTOP, EXTERNAL UNENCLOSED CIRCULATION AREAS,
 ETC. (PLEASE REFER TO THE DEFINITION FOR "GROSS
 BUILDING AREA"). THERE ARE SOME SPACES IN THE PLANS
 THAT SHOULD HAVE BEEN INCLUDED IN THE FAR CALCULATIONS
 BUT HAVE BEEN EXCLUDED FROM THE CALCULATIONS. PLEASE
 NOTE THAT THE MAXIMUM ALLOWABLE FAR IN OBD-25
 SUBDISTRICT IS 7.0. [ZLDR S.94-135, TABLE IV-70]
  
  
 PARKING REQUIREMENTS:
  
 1.) PLEASE CHECK THE PARKING CALCULATIONS. THERE SEEMS
 TO BE ERRORS IN THE CALCULATIONS (I.E. PARKING COUNT
 DOES NOT MATCH THE PARKING PROVIDED IN THE SITE PLAN).
 PLEASE CORRECT ANY ERRORS FOR CONSISTENCY.
  
 2.) PARKING SPACES FOR THE DISABLED SHALL BE PROVIDED
 ACCORDING TO SUBSECTION 94-485(O) OF THE ZLDRS.
 ACCORDING TO THE PARKING CALCULATIONS FOR THE PROJECT,
 THE DISABLE PARKING REQUIREMENT HAS NOT BEEN MET. THE
 ZLDRS REQUIRES A MINIMUM OF 2% OF PARKING PROVIDED FOR
 THE DISABLED. [ZLDR S.94-111 AND S94-485(O)].
  
 3.) PARKING STALL DIMENSIONS SHALL BE PROVIDED IN THE
 PLANS. PARKING STALL DIMENSIONS SHALL COMPLY WITH THE
 GENERAL PARKING STANDARDS ACCORDING TO ZLDR
 S.94-111(C).
  
 4.) THE PLANS IMPLY THAT THERE WILL BE COMPACT PARKING
 SPACES. PLEASE PROVIDE COMPACT PARKING SPACE
 CALCULATIONS AND IDENTIFY WHERE THE COMPACT PARKING
 SPACES WILL BE LOCATED IN THE PROJECT. PROVIDED COMPACT
 PARKING SHALL COMPLY WITH THE REQUIREMENTS OF ZLDR
 S.94-485.
  
 5.) THE PROJECT PROPOSES MECHANICAL PARKING. MECHANICAL
 PARKING SHALL REQUIRE A COMMERCIAL ATTENDANT AT ALL
 HOURS (24/7/365). SUCH OPERATION SHALL BE ENFORCED
 THROUGH A RESTRICTIVE COVENANT RECORDED IN THE PUBLIC
 RECORDS. ALL RESTRICTIVE COVENANT AND OTHER DOCUMENTS
 REQUIRED TO BE RECORDED SHALL BE ON CITY-APPROVED FORMS
 AND RECORDED IN THE PUBLIC RECORDS. [ZLDR S.94-111]
  
 6.) THE PROJECT SHALL COMPLY WITH THE MINIMUM LOADING
 REQUIREMENTS IN ZLDR S.94-485. PLEASE PROVIDE
 CALCULATIONS AND DIMENSIONS TO DEMONSTRATE COMPLIANCE.
 [ZLDR S.94-111 AND S.94-485]
  
 7.) WHY IS THE INGRESS AND EGRESS POINTS SO WIDE ALONG
 OKEECHOBEE BOULEVARD? PLEASE JUSTIFY AND PROVIDE
 SUPPORT/BACKUP MATERIAL (I.E. AUTO-TURN DIAGRAM), AS
 STAFF RECOMMENDS THE INGRESS/EGRESS POINT IS REDUCED TO
 24 FT. WIDE.
  
 8.) PARKING ENTRANCE/EXIT/DRIVEWAY SHALL NOT BE WIDER
 THAN 25 FT. AS MEASURED PARALLEL TO THE STREET AT THE
 CURB. THE DRIVEWAY SEEMS TO EXCEED THE MAXIMUM
 ALLOWABLE WIDTH ALONG OKEECHOBEE BOULEVARD. [ZLDR
 S.94-111(O)]
  
 9.) ALL NEW PROJECTS SHALL PROVIDE A FREIGHT DELIVERY
 PLAN AND ROUTES TO ENSURE DELIVERIES DO NOT IMPACT
 TRAFFIC OPERATIONS. THERE DOES NOT SEEM TO BE A FREIGHT
 DELIVERY PLAN WITH THE PROJECT APPLICATION. [ZLDR
 S.94-135(E)(2)(4)(C.)]
  
 10.) ALL NEW PROJECTS SHALL PROVIDE A CURB SIDE
 MANAGEMENT PLAN TO PRIORITIZE MULTIMODAL TRAVEL. THERE
 DOES NOT SEEM TO BE A CURB SIDE MANAGEMENT PLAN [ZLDR
 S.94-135(E)(2)(4)(D.)]
  
 11.) HOW IS THE REQUIRED BICYCLE PARKING MET FOR THE
 PROJECT? BICYCLE PARKING SHALL BE CONSISTENT WITH THE
 REQUIREMENTS SET FORTH IN SEC. 94-111 OF THE ZLDRS.
 ADDITIONALLY, BICYCLE PARKING CALCULATIONS, PROPOSED
 RACK AND STORAGE/CHANGE ROOM/SHOWER FACILITY LOCATION
 SHALL BE CLEAR IN THE PLANS.
  
  
 STREETSCAPE COMMENTS:
  
 1.) A SIDEWALK WITH A MINIMUM OF 8 FT. CLEAR WIDTH
 SHALL BE PROVIDED ALONG THE BUILDING FRONTAGE. PRIVATE
 SIDEWALKS WHICH SERVE AS AN EXTENSION OF THE PUBLIC
 SIDEWALK SHALL COMPLY WITH THE STREETSCAPE
 REQUIREMENTS, SHALL MATCH THE PUBLIC SIDEWALK IN DESIGN
 AND MATERIAL, AND SHALL PROVIDE A SEAMLESS TRANSITION
 BETWEEN THE TWO. PLEASE DEMONSTRATE IN THE PLANS AND
 PROVIDE DIMENSIONS TO ILLUSTRATE COMPLIANCE WITH THE
 ZLDRS. [ZLDR S.94-113(D.)(1)]
  
 2.) BICYCLE PARKING SHALL BE PROVIDED AT A MINIMUM OF
 ONE (1) SPACE PER EVERY 100 FT. OF STREET FRONTAGE.
 SPECIFICATIONS SHALL MEET CITY APPROVED STANDARDS.
 PLEASE INCLUDE A BICYCLE RACK DETAIL. [ZLDR
 S.94-113(D)(9)]
  
 3.) DRIVEWAYS AND CURB CUTS SHALL BE DESIGNED TO
 MINIMIZE THE NEGATIVE IMPACT IN THE PEDESTRIAN PATH OF
 TRAVEL. DRIVEWAYS SHALL MAINTAIN THE SIDEWALK
 ELEVATION. PLEASE PROVIDE A SECTION PARALLEL TO THE
 STREET TO DEMONSTRATE COMPLIANCE. [ZLDR
 S.94-113(D.)(10.)]
  
 4.) EXISTING SIDEWALK ADJACENT TO ONE CITY PLAZA SEEMS
 TO BE INCONSISTENT. PLEASE ADDRESS FOR ACCURACY AND
 ALSO SHOW HOW THE PROPOSED STREETSCAPE IMPROVEMENTS FOR
 THE PROJECT WILL CONNECT TO THE EXISTING STREETSCAPE OF
 THE ADJACENT PROJECT(S).
  
  
 ARCHITECTURAL COMMENTS:
  
 1.) PLANAR BREAKS AT THE GROUND LEVEL AND PODIUM: FOR
 BUILDING FRONTAGES GREATER THAN 150 FT., NO FACADE
 SHALL EXCEED 60% OF THE BUILDING FRONTAGE WITHOUT
 PROVIDING A PLANAR BREAK OR MULTIPLE PLANAR BREAKS A
 MINIMUM OF 3 FT. IN DEPTH. THE CUMULATIVE HORIZONAL
 LENGTH OF ALL PLANAR BREAKS SHALL BE GREATER THAN OR
 EQUAL TO 20% OF THE BUILDING FRONTAGE; BLANK WALLS ARE
 NOT PERMITTED. PLEASE PROVIDE CALCULATIONS, DIMENSIONS,
 ETC., IN THE PLANS TO DEMONSTRATE COMPLIANCE WITH THIS
 REQUIREMENT. THE PLANS PROVIDED
 DOES NOT SEEM TO COMPLY WITH THIS REQUIREMENT. [TABLE
 IV-4]
  
 2.) PER THE ZLDRS, "TRANSPARENCY" IS DEFINED AS
 "BUILDING FENESTRATION ON NON-RESIDENTIAL USES WHICH
 ALLOWS GROUND FLOOR VISUAL ACCESS BETWEEN A BUILDING
 AND ITS ACTIVE USES FROM THE PUBLIC SIDEWALK." THE
 TRANSPARENCY CALCULATIONS APPEARS TO BE
 INCONSISTENT/INCORRECT WITH THE ELEVATIONS/RENDERINGS
 PROVIDED IN THE PLAN SET (I.E. STAIRWELL WITHIN THE
 NORTHWEST CORNER OF THE BUILDING DOES NOT MEET THE
 DEFINITION OF TRANSPARENCY AND DOES NOT COUNT TOWARDS
 THE REQUIRED CALCULATIONS AS PROVIDED IN THE
 TRANSPARENCY CALCULATIONS IN THE PLAN SET). PLEASE
 CHECK TRANSPARENCY REQUIREMENTS AND CORRECT AS
 NECESSARY FOR CONSISTENCY. [ZLDR S.94-109 AND S.94-135,
 TABLE IV-70]
  
 3.) FOR THE EAST ELEVATION (SHEET A2.03), PLEASE
 PROVIDE A PROFILE OF THE ADJACENT ONE CITY PLAZA CONDO
 BUILDING TO SHOW HOW THE PROPOSED PROJECT WILL IMPACT
 THE ADJACENT USE. ADDITIONAL SECTION DRAWINGS MAY BE
 REQUIRED TO ILLUSTRATE IMPACT. PLEASE CONTACT CRAIG
 MCPHERSON, DEVELOPMENT SERVICES DEPARTMENT-CSD CUSTOMER
 SERVICE REPRESENTATIVE @ (561) 805-6684, TO OBTAIN THE
 ACCURATE DRAWINGS FOR ONE CITY PLAZA TO ASSIST WITH THE
 EXERCISE.
  
  
 SIGNAGE:
  
 1.) WILL THERE BE ANY SIGNAGE PROPOSED FOR THIS
 PROJECT? IF SO, PLEASE PROVIDE THE INFORMATION ON THE
 PROPOSED SIGNAGE. IF PROJECT SIGNAGE HAS YET TO BE
 DETERMINED, A NOTE STATING THAT ALL PROJECT SIGNAGE
 SHALL COMPLY WITH SEC. 94-110, OF THE ZONING AND LAND
 DEVELOPMENT REGULATIONS (ZLDRS) WILL BE REQUIRED IN THE
 PLANS.
  
  
 INSTRUCTIONS FOR RESUBMITTAL:
  
 * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 * WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF FOUR
 (4) PAPER COPIES, ONE REDUCED COPY IN 11 INCHES X 17
 INCHES, AND AN ELECTRONIC COPY OF ALL PLANS AND
 DOCUMENTS.
  
 *ANY CHANGES ON THE RESUBMITTED PLANS MAY RESULT IN
 ADDITIONAL COMMENTS.
  
 * PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20 PERCENT OF THE ORIGINAL APPLICATION FEE
 ($500.00).
  
 * CONTACT LINDA LOUIE @@ (561) 822-1458 IF THERE ARE
 QUESTIONS.
  

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved