Plan Review Details - Project Z22050021
| Plan Review Stops For Project Z22050021 |
| Review Stop |
AIPP |
ART IN PUBLIC PLACES |
| Rev No |
3 |
Status |
P |
Date |
10-03-2022 |
|
|
Cont ID |
|
| Sent By |
swelter |
Date |
10-03-2022 |
Time |
09:37 |
Rev Time |
0.00 |
| Received By |
swelter |
Date |
10-03-2022 |
Time |
10:11 |
Sent To |
|
|
| Notes |
| 2022-10-03 10:09:14 | PASSED - ART ASSESSMENT COMPLETED AND SUBMITTED ON | | | 10.3.2022 WITH THE FOLLOWING CONDITIONS: | | | PROJECT IDENTIFIES PUBLIC ART AT THE CORNER OF DIXIE | | | AND LAKE VIEW, AND THE SCUPLTURE IS MARKED WITHIN THE | | | PLANTER. THE FUTURE ARTWORK IF INSTALLED WITHIN THE | | | PLANTER NEEDS TO BE PLACED ON A PLINTH OR LARGE | | | PEDESTAL TO SEPARATE THE PUBLIC ART REQUIREMENT FORM | | | LANDSCAPE REQUIREMENTS. FURTHER, ESCROW OF THE 1% NEEDS | | | TO BE COMPLETED AND SUBMITTED TO SYBILLE WELTER | | | [email protected] BEFORE OR AT TIME OF BUILDING PERMIT | | | FEES. | | | |
|
|
| Review Stop |
AIPP |
ART IN PUBLIC PLACES |
| Rev No |
2 |
Status |
F |
Date |
07-08-2022 |
|
|
Cont ID |
|
| Sent By |
scwelter |
Date |
07-08-2022 |
Time |
10:31 |
Rev Time |
0.00 |
| Received By |
swelter |
Date |
07-08-2022 |
Time |
10:51 |
Sent To |
|
|
| Notes |
| 2022-07-08 10:48:27 | 1. THE ART PROVIDED WITHIN THE FOOTPRINT OF THE | | | BUILDING DOES NOT MEET THE LOCATION REQUIREMENT OF THE | | | PUBLIC ART ORDINANCE. | | | 2. RENDERINGS SHOW AN ART FEATURE ON THE CORNER OF | | | DIXIE AND LAKEVIEW; HOWEVER, THIS IS NOT CONSISTENT | | | WITH THE SITE PLAN THAT DEMONSTRATES A PLANTER. | | | 3. IF OPTION 1 ART ON SITE IS BEING CONSIDERED, THEN | | | THE PLACEMENT OF THE ART MUST MEET THE LOCATION | | | REQUIREMENT FURTHER, RENDERING AND SITE PLAN MUST BE | | | CONSISTENT. | | | 4. THE DECORATIVE GOLD LEAF ON THE WALL AT THE CORNER | | | OF LAKEVIEW AND DIXIE NEEDS TO BE IDENTIFIED AS IT | | | APPEARS TO BE A DECORATIVE PIECE AND IN ITS CURRENT | | | ITERATION NOT MEET THE PUBLIC ART REQUIREMENT. | | | 5. IF THE ART CANNOT BE ACCOMMODATED TO MEET THE PUBLIC | | | ART CRITERIA AND REQUIREMENTS SET FORTH IN THE | | | ORDINANCE THE DEVELOPER HAS THE OPTION TO CONTRIBUTE TO | | | THE PUBLIC ART ACCOUNT AT .75% (-25%) OF THE 1% TOTAL | | | CONSTRUCTION COSTS. | | | 6. CONTACT SYBILLE WELTER [email protected] FOR AN ART | | | ASSESSMENT APPLICATION, WHICH NEEDS TO BE PROVIDED TO | | | COMPLETE SITE APPROVAL PROCESS. | | | 7. AT THE TIME OF BUILDING PERMIT FEES, THE EVIDENCE OF | | | ESCROW IF CHOOSEN OPTION 1 OR THE CONTRIBUTION INTO THE | | | PUBLIC ART FUND MUST BE COMPLETED. | | | | | | |
|
|
| Review Stop |
AIPP |
ART IN PUBLIC PLACES |
| Rev No |
1 |
Status |
F |
Date |
06-10-2022 |
|
|
Cont ID |
|
| Sent By |
scwelter |
Date |
06-10-2022 |
Time |
15:41 |
Rev Time |
0.00 |
| Received By |
scwelter |
Date |
06-10-2022 |
Time |
15:43 |
Sent To |
|
|
| Notes |
| 2022-06-10 15:42:55 | PUBLIC ART REQUIREMENT: | | | TOTAL CONSTRUCTION COSTS OF THIS DEVELOPMENT ARE OVER | | | $500,000 IT IS SUBJECT TO THE PUBLIC ART REQUIREMENT AS | | | PER CITY ORDINANCE. | | | SECTION 78-129: ALL PRIVATE DEVELOPMENT PROJECTS, | | | INCLUDING NEW CONSTRUCTION, OR THE RENOVATION OR | | | IMPROVEMENT OF AN EXISTING BUILDING, WHERE TOTAL | | | CONSTRUCTION COSTS ARE EQUAL TO OR GREATER THAN | | | $500,000 ARE SUBJECT TO THE PUBLIC ART REQUIREMENT. | | | OPTION 1: INSTALL ARTWORK ON THE DEVELOPMENT SITE | | | VALUED IN AN AMOUNT NOT LESS THAN ONE PERCENT OF THE | | | TOTAL CONSTRUCTION COSTS; OR | | | OPTION 2: CONTRIBUTE AN AMOUNT EQUAL TO 75 PERCENT OF | | | ONE PERCENT OF THE TOTAL CONSTRUCTION COSTS FOR DEPOSIT | | | TO THE PUBLIC ART ACCOUNT. | | | A COMPLETED PUBLIC ART ASSESSMENT APPLICATION IS | | | REQUIRED AT TIME OF BUILDING PERMIT SUBMITTAL. | | | | | | CONTACT SYBILLE WELTER, ADMINISTRATOR OF PUBLIC ART & | | | CULTURE AT [email protected] TO OBTAIN AN ART ASSESSMENT | | | APPLICATION AND REVIEW THE REQUIREMENTS. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
06-08-2022 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
06-08-2022 |
Time |
19:58 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
06-08-2022 |
Time |
19:58 |
Sent To |
|
|
| Notes |
| 2022-06-08 20:04:45 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. DEMOLITION OF THE EXISTING BUILDINGS. AN ASBESTOS | | | SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT | | | REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH | | | COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963, | | | OR BY EMAIL: [email protected] | | | | | | 3. LOCATION OF ACCESSIBLE PARKING SPACES. LEVEL 3 PLAN, | | | SHEET A1.03, SHOWS 2 OF THE ACCESSIBLE PARKING SPACES | | | IS THE NORTH-WEST CORNER OF THE PARKING GARAGE. | | | ACCESSIBLE PARKING SPACES SHOULD BE THE CLOSEST PARKING | | | SPACES TO THE AREA OF THE BUILDING THAT THEY SERVE. | | | WHAT AREA/OCCUPANCY OF THE BUILDING ARE THOSE 2 SPACES | | | SERVING. PER SECTION 208.3 OF FLORIDA ACCESSIBILITY | | | CODE, ACCESSIBLE PARKING SPACES ARE TO BE LOCATED ON | | | THE SHORTEST POSSIBLE ROUTE OF TRAVEL FROM ADJACENT | | | PARKING TO AN ACCESSIBLE ENTRANCE. THE DESIGN OF | | | ACCESSIBLE PARKING SPACES SHALL COMPLY WITH SECTION 502 | | | OF FLORIDA ACCESSIBILITY CODE | | | | | | 4. VAN ACCESSIBLE PARKING SPACES. PER SECTION 208.2.4 | | | OF FLORIDA ACCESSIBILITY CODE, ONE IN EVERY SIX | | | REQUIRED ACCESSIBLE SPACES (AT LEAST ONE) IN A PARKING | | | STRUCTURE, SHALL BE ?VAN ACCESSIBLE? AND DESIGNED IN | | | ACCORDANCE WITH SECTION OF 502 OF FLORIDA ACCESSIBILITY | | | CODE (VERTICAL CLEARANCE NOT LESS THAN 98 INCHES AT | | | SPACE AND VEHICULAR ACCESS ROUTE) | | | | | | 5. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 6. BUILDING LOCATION RELATIVE TO THE PROPERTY LINE AND | | | OTHER STRUCTURES. WHEN SUBMITTED FOR BUILDING PERMIT, | | | COMPLIANCE WITH ALL BUILDING SEPARATION, PERCENTAGE OF | | | OPENINGS AND OPENING PROTECTIVE REQUIREMENTS OF | | | CHAPTERS 6 AND 7 OF THE FLORIDA BUILDING CODE SHALL BE | | | VERIFIED. | | | | | | 7. ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE DOES | | | NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL OPENINGS TO | | | MEET THE DEFINITION OF AN OPEN PARKING GARAGE, IT WILL | | | BE CONSIDERED AN ENCLOSED PARKING GARAGE AND MUST HAVE | | | EXHAUST SYSTEMS. THE EXHAUST SYSTEMS SHALL BE DESIGNED | | | TO MINIMIZE NOISE LEVELS USING INLINE FAN SILENCERS OR | | | OTHER APPROVED METHODS. | | | | | | 8. GREASE INTERCEPTOR. A GREASE INTERCEPTOR WILL BE | | | REQUIRED. FOR INFORMATION ON THE REQUIRED TYPE, SIZE | | | AND LOCATION, PLEASE CONTACT RYAN BROWN, CHIEF PLUMBING | | | INSPECTOR, DEVELOPMENT SERVICES DEPARTMENT, AT (561) | | | 805-6692, OR BY EMAIL: [email protected] | | | | | | 9. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS, | | | GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND | | | OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS, | | | SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC. | | | | | | 10. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND | | | CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF | | | CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL | | | NEIGHBORING PROPERTIES. | | | | | | 11. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER | | | AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY, | | | INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE | | | CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF | | | NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION | | | THAT MAY AFFECT THE USE OF THEIR PROPERTY. | | | | | | 12. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT | | | TO ART LIFE ASSESSMENT UNDER THE CITY OF WEST PALM | | | BEACH ART IN PUBLIC PLACES (AIPP) PROGRAM. FOR ADVICE | | | ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP | | | ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC | | | PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL: | | | [email protected] | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
4 |
Status |
P |
Date |
09-23-2022 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
09-23-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
09-23-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-09-23 17:36:50 | PASSED WITH PROVISO: CCTV TO BE PROVIDED WEEK OF | | | 10/24/22. |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
3 |
Status |
F |
Date |
08-15-2022 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
08-15-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
08-15-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-08-15 11:37:56 | WILL PASS ENGINEERING UPON RECEIPT OF REQUESTED CITY | | | UTILITY CCTV. |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
F |
Date |
07-07-2022 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
07-07-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
07-07-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-07-07 18:29:49 | O PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER | | | INFRASTRUCTURE ALONG ENTIRE PROJECT FRONTAGE (CONDITION | | | OF SITE PLAN APPROVAL). | | | | | | FOLLOW UP COMMENT: | | | PLEASE CLARIFY RESPONSE (?ACKNOWLEDGED.?). IS SANITARY | | | CCTV BEING OBTAINED AT THIS TIME? | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
06-08-2022 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
06-08-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
06-08-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-06-08 16:40:42 | COMMENTS FROM RICK ROSSANO, SR. PROJECT COORDINATOR, | | | ENGINEERING SERVICES AT 561-494-1098 [email protected] | | | GENERAL: | | | O PLEASE RESPOND TO ALL COMMENTS IN WRITING, AND | | | INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER | | | (Z-XXXXXXXX). | | | O THE CITY OF WEST PALM BEACH HAS A NUMBER OF | | | REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY | | | AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND | | | WASTEWATER UTILITIES WITHIN THE CITY. PLEASE SEE | | | DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AT THE LINK | | | BELOW: | | | A. HTTP://WPB.ORG/CMSPAGES/GETAMAZONFILE.ASPX?PATH=~\WP | | | B_WEBSITE\MEDIA\ENGINEERING\DEVELOPMENT-APPLICATION-FUL | | | L-PACKAGE_2016.PDF&HASH=7BD4DD7EB6115181D8C5977BCC02A97 | | | B1960045731D3658206F27451722716EF | | | B. THIS AND OTHER RELATED ENGINEERING DOCUMENTS CAN BE | | | FOUND HERE: | | | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR | | | MS,-PERMITS-APPLICATIONS | | | C. ALSO SEE: CODE OF ORDINANCES, CITY OF WEST PALM | | | BEACH, FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, | | | ADOPTED SEPT. 22, 2008. (SUPPLEMENT NO. 18) | | | CHAPTER 90 UTILITIES, ARTICLE I. IN GENERAL, | | | SEC. 90-7. POLICY REGARDING EXTENSION OF WATER OR SEWER | | | SERVICE FACILITIES OF THE CITY. | | | THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE | | | CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY | | | BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS, | | | BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION. | | | O AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH | | | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, | | | STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR | | | MORE INFORMATION, REFER TO THE LINK BELOW: | | | A. HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PU | | | BLICATIONS/BACKFLOW-CROSS-CONNECTION- CONTROL-MANUAL | | | O PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY | | | OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC | | | RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF | | | YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE | | | MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL | | | IN THE WPB ENGINEERING SERVICES DEPARTMENT AT | | | [email protected] OR 561-494-1079 FOR FURTHER | | | ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION | | | ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD | | | SURVEY, POT-HOLING, SOFT DIGS ETC. | | | O PROVIDE EXISTING AND PROPOSED PERVIOUS AND IMPERVIOUS | | | DATA. | | | | | | BACKFLOW ASSEMBLY AND METERS: | | | O SHOW AND LABEL ANY EXISTING OR PROPOSED WATER | | | SERVICES AND WATER METERS, ALONG WITH WHAT IS HAPPENING | | | TO THEM. | | | O SHOW EXISTING AND PROPOSED DEDICATED UTILITY | | | EASEMENTS TO ALLOW ACCESS FOR CITY PERSONNEL TO | | | PROPOSED UTILITY WATER METERS. VERIFY THAT THERE ARE NO | | | STRUCTURES WITHIN EASEMENT. | | | O PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED LOCATION | | | OF WATER METER AND BACKFLOW | | | PREVENTION. | | | O BACKFLOWS SHALL BE INSTALLED ON PRIVATE PROPERTY | | | OUTSIDE OF EASEMENTS AND RIGHTS OF WAY. DOMESTIC WATER | | | METERS SHALL BE INSTALLED IMMEDIATELY ADJACENT TO | | | PROPERTY LINE. 3 INCH AND LARGER WATER METERS SHALL BE | | | INSTALLED ABOVE-GROUND ONLY. | | | O CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA (MAKE | | | NOTE USC APPROVED) AND FIRE BACKFLOW PREVENTER AS DCDA. | | | | | | WATER/WASTEWATER PLAN: | | | O PROVIDE VERTICAL DATUM AND DATUM CONVERSION | | | INFORMATION (NAVD 1988 AND NGVD 1929). | | | O SHOW PROJECT ADDRESS ON ALL PLAN SHEETS. | | | O PROVIDE LEGEND ON ALL PLAN SHEETS TO INCLUDE | | | STREETLIGHT, SIGN POSTS, TRANSFORMER BOXES ETC. | | | O PLANS SHALL SHOW EXISTING AND PROPOSED LOCATIONS AND | | | DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND | | | SEWER LINES AND CLEANOUTS, INCLUDING STUBS TO EACH | | | PROPERTY LINE FOR WATER AND SANITARY SEWERS, THE MAKE | | | AND MODEL OF ALL VALVES, POTABLE AND IRRIGATION METERS, | | | BACKFLOWS, FIRE HYDRANTS AND FDCS, AND OTHER DEVICES TO | | | BE INSTALLED ON THE SYSTEM, CATCH BASINS, CULVERTS, | | | DITCHES INCLUDING GRADES, PIPES SIZES, MATERIALS, | | | ELEVATIONS, ASSUMPTIONS, CALCULATIONS, INVERT | | | ELEVATIONS FOR ALL INLETS AND MANHOLES AND PROFILES OF | | | SANITARY SEWER LINES. | | | O GATE VALVE BOXES SHALL NOT BE INSTALLED IN CURB OR | | | SIDEWALK. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE | | | PROFILE VIEW. | | | O DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN | | | VIEW FOR ALL SANITARY AND STORM SEWERS. | | | O SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT | | | MATERIAL. | | | O PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED | | | UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC, | | | ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION | | | FACILITIES LOCATED ON THE RIGHT-OF-WAY. | | | O PROVIDE PROFILE AND CLEARANCES BETWEEN WATER, SEWER | | | AND STORM LINES PER CITY OF WEST PALM BEACH STANDARD | | | DETAIL GN-2 SERIES, AT ALL UTILITY CROSSINGS. | | | O SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE DIRECTLY | | | TO ENGINEERING (SHEET 33 OF CITY OF WPB DEVELOPMENT | | | APPLICATION). PROVIDE CALCULATIONS ON PLANS OF EXISTING | | | AND PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, | | | MAXIMUM AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS | | | SHALL BE PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 | | | FOR WATER. | | | O PROVIDE FIRE FLOW TEST DATA. | | | O PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER | | | INFRASTRUCTURE ALONG ENTIRE PROJECT FRONTAGE (CONDITION | | | OF SITE PLAN APPROVAL). | | | O CUT AND CAP UTILITIES NOT IN USE AND REMOVE ANY | | | ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY | | | ROW. | | | O WHEN PROPOSED, WATER MAINS IN CITY RIGHT OF WAY SHALL | | | BE MADE OF DUCTILE IRON PIPE (NOT PVC) AND SPECIFY | | | PROPOSED LENGTH IN FEET. | | | O CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY | | | SEWER ARE REQUIRED. | | | O PROVIDE CLEANOUTS FOR PROPOSED SANITARY LINE ONSITE | | | JUST INSIDE PROPERTY LINE, AT JOINTS AND EVERY 75 FEET. | | | O ADD NOTE TO PLANS SPECIFYING CITY?S DOWNSTREAM LIFT | | | STATION NUMBER. | | | O PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR | | | PROPOSED SANITARY LATERALS. | | | O LABEL WATER LINES AS PRIVATE WHERE APPLICABLE. | | | O PLEASE SHOW AND LABEL EXISTING AND PROPOSED GREASE | | | TRAPS (IF ANY). | | | O PER CITY STANDARDS MAINTAIN MINIMUM DISTANCE BETWEEN | | | OUTSIDE DIAMETER OF CITY PIPE AND ROOT BARRIER. | | | | | | FORMAL ENGINEERING REVIEW: | | | O FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND NPDES | | | NOI REQUIREMENTS WILL BE ENFORCED. | | | - AN NOI IS REQUIRED FOR PROJECTS THAT: | | | - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS | | | THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF | | | DEVELOPMENT OR SALE; | | | - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE | | | STATE OR TO SURFACE WATERS OF THE STATE THROUGH A | | | MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4). | | | - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF | | | CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION | | | THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL | | | SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT | | | OF THE 10-2 CERTIFICATION. | | | O FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | EASEMENT FOR PLACEMENT OF PROPOSED WATER METERS. | | | O FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES OF | | | WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS. | | | O FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING | | | APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT | | | SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING | | | SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED | | | LEAD-FREE DESIGN. | | | O FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY LINES | | | ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY | | | LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT | | | PARCELS. | | | O FOR FORMAL ENGINEERING SUBMITTAL, IF WATER LINES ARE | | | BEING REPLACED IN ROW, SHOW ADJACENT PARCEL ADDRESSES. | | | O FOR FORMAL ENGINEERING SUBMITTAL, ADD NOTE TO PROVIDE | | | 50 FT. PAVEMENT RESTORATION TRANSITION ON EACH SIDE OF | | | PROPOSED TRENCH IN CITY MAINTAINED ROADWAY AREAS PER | | | CITY OF WPB STANDARD DETAIL GC-8. | | | O FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | CALCULATIONS OF PERVIOUS AND IMPERVIOUS AREAS FOR | | | PROPOSED IMPROVED AREAS. | | | | | | | | | | | | QUESTIONS AND COORDINATION CONTACTS: | | | O MARK HURLEY, FIELD CUSTOMER SERVICE SUPERVISOR WITH | | | CITY OF WPB PUBLIC UTILITIES, REGARDING PLACEMENT OF | | | BACKFLOW DEVICES AND WATER METERS. CONTACT HIM AT | | | 561-822-2262 OR [email protected] | | | O MIKE TECHNOW, PROJECT ENGINEER, PUBLIC UTILITIES | | | DEPARTMENT AT 561-494-1047 OR [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
06-02-2022 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
06-02-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
06-02-2022 |
Time |
10:45 |
Sent To |
|
|
| Notes |
| 2022-06-02 11:34:16 | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, | | | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM | | | BEACH FIRE RESCUE. | | | | | | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE | | | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. | | | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS | | | ARE SUBMITTED FOR PERMIT. | | | | | | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE | | | PROPOSED PROJECT; HOWEVER, THE FOLLOWING COMMENTS ARE | | | PROVIDED AND MAY NEED FURTHER CLARIFICATIONS WHERE | | | APPLICABLE. | | | | | | 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY | | | WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE | | | PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A | | | PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED | | | TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN | | | STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY | | | MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER | | | PROTECTION. | | | | | | 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY | | | IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING | | | ALL CONSTRUCTION ACTIVITIES. | | | | | | 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM | | | ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION. | | | ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND | | | AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT | | | WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS. | | | | | | 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE | | | REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE | | | ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS. | | | | | | 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH | | | THE 7TH EDITION OF THE FLORIDA FIRE PREVENTION CODE, | | | INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES. | | | | | | 6. ALL PARKING STRUCTURES SHALL COMPLY WITH NFPA 88A, | | | PARKING STRUCTURES AND NFPA 101, THE LIFE SAFETY CODE, | | | INCLUDING MORE SPECIFICALLY, CHAPTER 42 STORAGE | | | OCCUPANCIES (PARKING STRUCTURES) | | | | | | 7. A NFPA 13 COMPLAINT FIRE SPRINKLER SYSTEM AND NFPA | | | 14 COMPLIANT WET STANDPIPE SYSTEM ARE REQUIRED FOR THIS | | | STRUCTURE. TEMPORARY STANDPIPES ARE REQUIRED WHEN THE | | | BUILDING REACHES THREE LEVELS OR THIRTY FEET WHILE | | | BEING CONSTRUCTED. | | | | | | SEPARATE SHOP DRAWINGS, ARE REQUIRED TO BE SUBMITTED, | | | REVIEWED AND APPROVED BY THE FIRE PREVENTION BUREAU | | | PRIOR TO ANY INSTALLATION. | | | | | | IT IS RECOMMENDED FOR HIGH RISES TO HAVE TWO SEPARATE | | | FDC LOCATIONS REMOTELY LOCATED TO SERVE THE STANDPIPE | | | SYSTEM. | | | | | | ONE PROPOSED FIRE HYDRANT IS INDICATED ALONG LAKEVIEW. | | | | | | A SECOND ONE IS RECOMMENDED TO BE INSTALLED ALONG | | | OKEECHOBEE BLVD. | | | | | | | | | 7A. PER NFPA 14 | | | | | | 6.4.5.4* FIRE DEPARTMENT CONNECTIONS SHALL BE LOCATED | | | NOT MORE THAN 100 FT (30.5 M) FROM THE NEAREST FIRE | | | HYDRANT CONNECTED TO AN APPROVED WATER SUPPLY. | | | | | | ONE FDC IS INDICATED ALONG LAKEVIEW; HOWEVER IT APPEARS | | | TO BE LOCATED UNDER AND WITHIN THE PARKING GARAGE. IT | | | IS RECOMMENDED TO BE RELOCATED FROM UNDER/WITHIN THE | | | PARKING GARAGE TO AN AGREED UPON LOCATION ALONG THAT | | | EXTERIOR AREA WITHIN 100' OF THE FIRE HYDRANT. FOR | | | CONSIDERATION PURPOSES, IT CAN BE WALL MOUNTED. | | | | | | THE SECOND RECOMMENDED FDC LOCATION CAN BE ALONG | | | OKEECHOBEE BLVD IN AN AGREED UPON LOCATION ALONG THAT | | | EXTERIOR AREA WITHIN 100' OF THE RECOMMENDED SECOND | | | FIRE HYDRANT. FOR CONSIDERATION PURPOSES, IT CAN BE | | | WALL MOUNTED. | | | | | | | | | 7B. PER NFPA 1 | | | | | | 18.3 WATER SUPPLIES. | | | 18.3.1* AN APPROVED WATER SUPPLY CAPABLE OF SUPPLYING | | | THE REQUIRED FIRE FLOW FOR FIRE PROTECTION SHALL BE | | | PROVIDED TO ALL PREMISES UPON WHICH FACILITIES, | | | BUILDINGS, OR PORTIONS OF BUILDINGS ARE HEREAFTER | | | CONSTRUCTED OR MOVED INTO THE JURISDICTION. THE | | | APPROVED WATER SUPPLY SHALL BE IN ACCORDANCE WITH | | | SECTION 18.4. | | | | | | PER FLORIDA ADMINISTRATIVE CODE SECTION 61G15-32.004, | | | FIRE PROTECTION ENGINEERING DOCUMENTS SHALL INCLUDE THE | | | POINT OF SERVICE FOR THE WATER SUPPLY, A LIST OF | | | APPLICABLE NFPA STANDARDS APPLICABLE TO THE PROJECT, | | | CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR | | | AREA, SUPPRESSION SYSTEM TYPE, DESIGN DENSITIES, WATER | | | SUPPLY DATA (FIRE PUMP DATA, HYDRANT FLOW TEST DATA) | | | AND ANY PERFORMANCE BASED INFORMATION SUCH AS | | | PRE-ENGINEERED SYSTEMS. | | | | | | FOR THE PROPOSED FIRE PUMP(S) , WHAT IS(ARE) THE | | | PRIMARY AND SECONDARY POWER SOURCES? | | | | | | 7C. THE LOCATION OF THE DDCV FIRE LINE LOCATION SHALL | | | MEET THE REQUIREMENTS OF NFPA 24 AND SHALL BE | | | COORDINATED WITH THE OFFICE OF FIRE MARSHAL, THE CITY'S | | | ENGINEERS OFFICE, THE LANDSCAPE PLANNER, AND THE CITY'S | | | PLANNING AND ZONING OFFICE. | | | | | | IT APPEARS THAT A FIRE DDCV IS LOCATED WITHIN THE | | | PARKING GARAGE AND IF APPROVED BY STAFF AT THIS | | | LOCATION, IT WOULD REQUIRE PROTECTION FROM ACCIDENTAL | | | VEHICLE CONTACT. | | | | | | | | | 8. A NFPA 72 COMPLIANT MONITORED FIRE ALARM SYSTEM IS | | | REQUIRED FOR THIS STRUCTURE. SEPARATE SHOP DRAWINGS, | | | ARE REQUIRED TO BE SUBMITTED, REVIEWED AND APPROVED BY | | | THE FIRE PREVENTION BUREAU PRIOR TO ANY INSTALLATION. | | | | | | | | | 9. ALL ELEVATORS SHALL BE EQUIPPED WITH A REGION 7 | | | KEYWAY SYSTEM. | | | | | | ALL NEW ELEVATORS SHALL CONFORM TO THE FIRE FIGHTER?S | | | EMERGENCY OPERATIONS REQUIREMENTS OF ASME A17.1/CSA | | | B44, SAFETY CODE FOR ELEVATORS. | | | | | | ANY BUILDING THAT IS MORE THAN THREE STORIES HIGH OR IN | | | WHICH THE VERTICAL DISTANCE BETWEEN THE BOTTOM TERMINAL | | | LANDING AND THE TOP TERMINAL LANDING EXCEEDS 25 FEET | | | MUST BE CONSTRUCTED TO CONTAIN AT LEAST ONE PASSENGER | | | ELEVATOR THAT IS OPERATIONAL AND WILL ACCOMMODATE AN | | | AMBULANCE STRETCHER 76 INCHES LONG AND 24 INCHES WIDE | | | IN THE HORIZONTAL POSITION. | | | | | | 10. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL | | | BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL | | | DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS, | | | EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A | | | PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE | | | SAFETY FEATURES AND EQUIPMENT. | | | | | | A REVIEW OF THE PROPOSED FLOOR LAYOUT INDICATES | | | CENTRALLY LOCATED EXIT STAIRS. THIS PROPOSED | | | CONFIGURATION MAY REQUIRE A DETAILED REVIEW FOR | | | COMPLIANCE WITH THE MINIMUM SEPARATION DISTANCES OF 2 | | | EXITS REMOTELY LOCATED FROM EACH OTHER PER NFPA 101 CH | | | 7, MEAND OF EGRESS. IT APPEARS THAT A PERSON LEAVING A | | | CERTAIN ROOM CAN ONLY GO IN ONE DIRECTION THAT WOULD | | | VIRTUALLY QUALIFY THAT ROUTE AS A SINGLE AND ONLY EXIT. | | | | | | | | | 10A. THE LEVEL 8 AMENITY DECK INDICATES A SINGLE EXIT | | | FROM THE OPEN POOL DECK AREA AND THE CENTRAL EXITS | | | STAIRS WITHIN THE CORE BUILDING. A REVIEW OF THE | | | AMEMITY DECK IS REQUIRED TO ENSURE THE THE TOTAL | | | OCCUPANCY LOAD CAN BE SERVED BY THESE TWO EXITS. A | | | THIRD EXIT STAIR MAY BE REQUIRED FROM THE OPEN POOL | | | AREA REMOTELY LOCATED PER NFPA 101, CH 7, MEAND OF | | | EGRESS. | | | | | | | | | 10B. THE ROOFTOP PLAN INDICATES AN AMENITY DECK WITH | | | THE SAME CENTAL EXIT STAIR CONFIGURATION THAT MAY NOT | | | MEET THE SEPARATION REQUIREMENTS OF NFPA 101, CH 7 | | | MEANS OF EGRESS. | | | | | | A DETAILED REVIEW MAY BE REQUIRED TO ENSURE COMPLIANCE. | | | | | | 11. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED | | | ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF | | | FIRE PREVENTION. | | | | | | SEE SIMILAR COMMENTS OF 7A ABOVE, ALL NEW FIRE HYDRANTS | | | AND FDC?S PLANNED FOR THIS DEVELOPMENT SHALL BE CLOSELY | | | COORDINATED WITH THE BUREAU OF FIRE PREVENTION. | | | | | | 12. COMMAND ROOM | | | | | | THE FIRE COMMAND CENTER SHALL COMPLY WITH NFPA 1, | | | CHAPTER 11, BUILDING SERVICES; 11.9 AND SHALL CONTAIN | | | THE FOLLOWING FEATURES: | | | | | | 11.9.1 THE LOCATION, DESIGN, CONTENT, AND FIRE | | | DEPARTMENT ACCESS OF THE EMERGENCY COMMAND CENTER SHALL | | | BE APPROVED BY THE FIRE DEPARTMENT. | | | | | | 11.9.2 THE EMERGENCY COMMAND CENTER SHALL BE SEPARATED | | | FROM THE REMAINDER OF THE BUILDING BY A FIRE BARRIER | | | HAVING A FIRE RESISTANCE RATING OF NOT LESS THAN 1 | | | HOUR. | | | | | | 11.9.3 THE EMERGENCY COMMAND CENTER ROOM SHALL BE A | | | MINIMUM OF 200 FT2 (19 M2) WITH A MINIMUM DIMENSION OF | | | 10 FT (3050 MM). | | | | | | 11.9.4 THE FOLLOWING SHALL BE PROVIDED IN THE EMERGENCY | | | COMMAND CENTER. | | | (1) THE FIRE DEPARTMENT COMMUNICATIONS SYSTEM. | | | (2) A TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED | | | ACCESS TO THE PUBLIC TELEPHONE SYSTEM | | | (3) SCHEMATIC BUILDING PLANS INDICATING THE TYPICAL | | | FLOOR PLAN AND DETAILING THE BUILDING CORE, MEANS OF | | | EGRESS, FIRE PROTECTION SYSTEMS, FIRE-FIGHTING | | | EQUIPMENT AND FIRE DEPARTMENT ACCESS | | | (4) WORK TABLE. | | | (5) IF APPLICABLE, A HAZARDOUS MATERIAL MANAGEMENT PLAN | | | FOR THE BUILDING. | | | 11.9.5 WHERE OTHERWISE REQUIRED, THE FOLLOWING DEVICES | | | OR FUNCTIONS SHALL BE PROVIDED WITHIN THE EMERGENCY | | | COMMAND CENTER. | | | (1) THE EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM | | | CONTROL UNIT. | | | (2) FIRE DETECTION AND ALARM SYSTEM ANNUNCIATOR UNIT. | | | (3) ANNUNCIATOR UNIT VISUALLY INDICATING THE LOCATION | | | OF THE ELEVATORS AND WHETHER THEY ARE OPERATIONAL | | | (4) STATUS INDICATORS AND CONTROLS FOR AIR-HANDLING | | | SYSTEMS. | | | (5) CONTROLS FOR UNLOCKING STAIRWAY DOORS | | | SIMULTANEOUSLY | | | (6) SPRINKLER VALVE AND WATER FLOW DETECTOR DISPLAY | | | PANELS | | | (7) EMERGENCY AND STANDBY POWER STATUS INDICATORS | | | (8) FIRE PUMP STATUS INDICATORS | | | (9) GENERATOR SUPERVISION DEVICES AND MANUAL START AND | | | TRANSFER FEATURES. | | | (10) PUBLIC ADDRESS SYSTEM, WHERE SPECIFICALLY REQUIRED | | | BY OTHER SECTIONS OF THIS CODE | | | (11) CONTROLS REQUIRED FOR SMOKE CONTROL | | | | | | NFPA 101 | | | | | | 11.8.6* EMERGENCY COMMAND CENTER. | | | 11.8.6.1 AN EMERGENCY COMMAND CENTER SHALL BE PROVIDED | | | IN A | | | LOCATION APPROVED BY THE FIRE DEPARTMENT. | | | 11.8.6.2 THE EMERGENCY COMMAND CENTER SHALL CONTAIN THE | | | FOLLOWING: | | | (1) VOICE FIRE ALARM SYSTEM PANELS AND CONTROLS | | | (2) FIRE DEPARTMENT TWO-WAY TELEPHONE COMMUNICATION | | | SERVICE | | | PANELS AND CONTROLS WHERE REQUIRED BY ANOTHER SECTION | | | OF THIS | | | CODE | | | (3) FIRE DETECTION AND FIRE ALARM SYSTEM ANNUNCIATION | | | PANELS | | | (4) ELEVATOR FLOOR LOCATION AND OPERATION ANNUNCIATORS | | | (5) ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME | | | A17.1/CSA B44, SAFETY CODE FOR ELEVATORS AND ESCALATORS | | | (6) ELEVATOR EMERGENCY POWER SELECTOR SWITCH(ES) WHERE | | | PROVIDED | | | IN ACCORDANCE WITH ASME A17.1/CSA B44 | | | (7) SPRINKLER VALVE AND WATERFLOW ANNUNCIATORS | | | (8) EMERGENCY GENERATOR STATUS INDICATORS | | | (9) CONTROLS FOR ANY AUTOMATIC STAIRWAY DOOR UNLOCKING | | | SYSTEM | | | (10) FIRE PUMP STATUS INDICATORS | | | (11) TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED | | | ACCESS TO THE | | | PUBLIC TELEPHONE SYSTEM | | | (12) STAIRWAY VIDEO MONITORING EQUIPMENT AS REQUIRED BY | | | 11.8.8 | | | | | | | | | | | | 13. TWO-WAY RADIO COMMUNICATIONS ENHANCEMENT SYSTEMS. | | | | | | NFPA 1, CHAPTER 11, BUILDING SERVICES; 11.10 TWO-WAY | | | RADIO ENHANCEMENT SERVICES. | | | | | | 11.10.1 IN ALL NEW AND EXISTING BUILDINGS, MINIMUM | | | RADIO SIGNAL STRENGTH FOR FIRE DEPARTMENT | | | COMMUNICATIONS SHALL BE MAINTAINED AT A LEVEL | | | DETERMINED BY THE AHJ. | | | NFPA 72, 24.9 TWO-WAY RADIO COMMUNICATIONS ENHANCEMENT | | | SYSTEMS. | | | | | | 24.9.1 GENERAL. | | | 24.9.1.1 NON-INTERFERENCE. NO AMPLIFICATION SYSTEM | | | CAPABLE | | | OF OPERATING ON FREQUENCIES OR CAUSING INTERFERENCE ON | | | FREQUENCIES | | | ASSIGNED TO THE JURISDICTION BY THE FCC SHALL BE | | | INSTALLED | | | WITHOUT PRIOR COORDINATION AND APPROVAL OF THE | | | AUTHORITY | | | HAVING JURISDICTION. THE BUILDING MANAGER/OWNER SHALL | | | SUSPEND AND CORRECT OTHER EQUIPMENT INSTALLATIONS THAT | | | DEGRADE | | | THE PERFORMANCE OF THE PUBLIC SAFETY RADIO SYSTEM OR | | | PUBLIC SAFETY RADIO ENHANCEMENT SYSTEM. | | | 24.9.1.2 APPROVAL AND PERMIT. PLANS SHALL BE SUBMITTED | | | FOR | | | APPROVAL PRIOR TO INSTALLATION. AT THE CONCLUSION OF | | | SUCCESSFUL | | | ACCEPTANCE TESTING, A RENEWABLE PERMIT SHALL BE ISSUED | | | FOR THE | | | PUBLIC SAFETY RADIO ENHANCEMENT SYSTEM WHERE REQUIRED | | | BY | | | THE AUTHORITY HAVING JURISDICTION. | | | | | | THE SYSTEM SHALL MAINTAIN A MINIMUM RADIO SIGNAL | | | STRENGTH OF -95 DBM FOR THE RADIO SYSTEM USED BY WEST | | | PALM BEACH FIRE DEPARTMENT. TESTING SHALL BE BY AN | | | ACCEPTABLE NATIONAL STANDARD DOCUMENTING PERCENTAGES | | | NOTED ABOVE AND BY ACTUAL RADIO TESTING BY FIRE | | | PERSONNEL. IF THE MINIMUM CANNOT BE MAINTAINED, A | | | BI-DIRECTIONAL AMPLIFIED SYSTEM SHALL BE INSTALLED WITH | | | A MINIMUM 2-HOUR RUN TIME BATTERY BACK-UP. | | | PLEASE CONTACT MARK FILLA, PALM BEACH COUNTY PUBLIC | | | SAFETY RADIO SYSTEMS MANAGER, [email protected], | | | 561-233-0837; AS OUR RADIOS OPERATE ON THEIR SYSTEM FOR | | | DETAILED RADIO FREQUENCY AND INSTALLATION INSTRUCTIONS. | | | | | | | | | 14. KNOX-BOX KEY SYSTEM SHALL BE REQUIRED FOR THIS | | | BUILDING. | | | | | | ANY GATES SHALL BE PROVIDED WITH KNOX KEY ACCESS LOCKS, | | | PADLOCKS AND/OR SWITCHES FOR 24 HOUR EMERGENCY ACCESS. | | | | | | | | | 15. THE SMOKE CONTROL SYSTEM SHALL COMPLY WITH NFPA | | | 101, CHAPTER 9, BUILDING SERVICE AND FIRE PROTECTION | | | EQUIPMENT, INCLUDING: | | | | | | THE SMOKE CONTROL SYSTEMS SHALL BE INSTALLED, | | | INSPECTED, TESTED, AND MAINTAINED IN ACCORDANCE WITH | | | NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS; NFPA 204, | | | STANDARD FOR SMOKE AND HEAT VENTING; OR NATIONALLY | | | RECOGNIZED STANDARDS, ENGINEERING GUIDES, OR | | | RECOMMENDED PRACTICES, AS APPROVED BY THE AUTHORITY | | | HAVING JURISDICTION. | | | | | | THE ENGINEER OF RECORD SHALL CLEARLY IDENTIFY THE | | | INTENT OF THE SYSTEM, THE DESIGN METHOD USED, THE | | | APPROPRIATENESS OF THE METHOD USED, AND THE REQUIRED | | | MEANS OF INSPECTING, TESTING, AND MAINTAINING THE | | | SYSTEM. | | | | | | ACCEPTANCE TESTING SHALL BE PERFORMED BY A SPECIAL | | | INSPECTOR IN ACCORDANCE WITH SECTION 9.9. | | | | | | 16. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT | | | DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | 17. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING | | | PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH | | | THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
4 |
Status |
P |
Date |
09-29-2022 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
09-29-2022 |
Time |
16:22 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
09-29-2022 |
Time |
16:22 |
Sent To |
|
|
| Notes |
| 2022-09-29 16:24:16 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 320 LAKEVIEW Z22050021 | | | SEPTEMBER 29, 2022 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | | | | 1. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE | | | TREES AND PALMS IN GOOD CONDITION TO BE PRESERVED ON | | | SITE OR RELOCATED. ANSI A 300 (PART 5) STANDARDS | | | SPECIFY EXAMPLES OF SUITABILITY RATINGS OF GOOD, | | | MODERATE, OR POOR FOR RELOCATION. PROVIDE THE ARBORISTS | | | REPORT RATING THE CONDITION AND RELOCATION POTENTIAL | | | FOR THE NATIVE TREES AND PALMS, IT WAS NOT LOCATED IN | | | THE SUBMITTAL. NON NATIVE TREES AND PALMS ARE NOT | | | REQUIRED TO BE RELOCATED. THERE ARE 3 SABAL PALMS | | | LISTED AS GOOD CONDITION THAT MUST BE RELOCATED. | | | | | | 2. MAKE THE FOLLOWING CORRECTIONS TO THE TREE | | | DISPOSITION LIST: | | | ??? SATISFIED. ONLY TREES PROPOSED TO BE REMOVED WITH A | | | CANOPY DIAMETER OF 20 FEET OR MORE SHOULD HAVE THE | | | MITIGATION SQUARE FOOTAGE CALCULATED BASED ON THE | | | ACTUAL DIAMETER. TREES LESS THAN 20 FEET CANOPY | | | DIAMETER AND PALMS SHOULD SHOW THE CATEGORY MITIGATION | | | DUE. THE TREE CATEGORY LIST IS AVAILABLE FROM CITY | | | STAFF. | | | ??? SATISFIED. SHOW ONE COLUMN ON THE DISPOSITION CHART | | | FOR MITIGATION DUE FOR REMOVALS ONLY AND PROVIDE THE | | | TOTAL SQUARE FOOTAGE. | | | | | | 3. SATISFIED. THE DIAGRAM OF THE REQUIRED AND PROVIDED | | | PUBLIC AND PRIVATE OPEN SPACE AREAS FOR OBD 25 ZONING | | | DISTRICT ON SHEET LP-4 IDENTIFIES THE TYPE OF PUBLIC | | | OPEN SPACE AS PLAZA AS ALLOWED BY TABLE IV-7 AND | | | DEFINITIONS IN SECTION 94-109. THE PRIVATE OPEN SPACE | | | AREA IS IDENTIFIED AS INTERIOR COURTYARD BUT DOES NOT | | | MEET THE DEFINITION. THE OPEN SPACE TYPE SHOULD BE | | | ROOFTOP GARDEN AND THE REQUIREMENTS SHOWN. | | | 7/21/22 MAKE THE FOLLOWING CORRECTIONS: | | | ??? ALL CALCULATIONS FOR PLAZA REQUIREMENTS MUST BE | | | CALCULATED BASED ON THE PROVIDED AREA OF 2010 SQ FT. | | | AND THE PROVIDE SHOWN THAT MEETS OR EXCEEDS THE | | | REQUIRED. | | | ??? VEGETATED AREA OF 503 SQ FT IS REQUIRED | | | ??? OVERHEAD COVER MIN IS 201 SQ FT AND MAX IS MAX IS | | | 402 SQ FT | | | ??? TREE CANOPY CREDITS NEED TO BE REVISED. COCONUT | | | PALM DOES NOT QUALIFY AS A LARGE PALM. CALLIANDRA WOULD | | | BE A SMALL TREE FOR 150 SQ FT. CHANGE TO TREES THAT | | | WILL PROVIDE THE INTENDED SHADE. | | | ??? FOR PRIVATE OPEN SPACE, DO NOT COUNT COCONUTS, | | | COUNT ONLY 12 EAST PALATKA HOLLY AS MEETING THE 300 SQ | | | FT EACH FOR TYPE 2: MEDIUM TREE FOR TOTAL 3600 SQ FT | | | PROVIDED AND 2819 REQUIRED. | | | ??? FOR ROOFTOP GARDEN, THERE APPEARS TO BE PART OF THE | | | DESIGNATED OPEN SPACE AREA COVERED BY A ROOF AREA ON | | | THE SOUTH SIDE OF THE POOL THAT IS INCONSISTENT BETWEEN | | | SHEETS L-4 AND LP-4. | | | ??? SHEET LP-2 NEEDS TO SHOW THE OUTLINE OF THE PRIVATE | | | OPEN SPACE AREA. | | | | | | 4. SATISFIED. INCLUDE A PLANT LIST OF THE TREES, SHRUBS | | | AND GROUNDCOVER PROPOSED FOR EACH OPEN SPACE AREA AND | | | SHOW THE CREDITS GIVEN FOR TREE CANOPY SQUARE FOOTAGE | | | BASED ON TABLE IV-8. | | | SEE COMMENT #3 FOR CORRECTIONS. | | | | | | 5. SATISFIED. IDENTIFY RELOCATED TREES OR PALMS ON THE | | | PLANT LIST AND COUNT THEM TOWARD THE REQUIRED TREES. | | | | | | 6. SATISFIED. PROVIDE CALCULATIONS FOR REQUIRED STREET | | | TREES AT MAXIMUM SPACING EVERY 30 FEET OR PORTION | | | THEREOF FOR EACH STREETSCAPE LENGTH, AND SHOW THE | | | NUMBER PROVIDED PER SECTION 94-113. | | | | | | 7. SATISFIED. PROVIDE LOCATIONS AND DETAIL FOR THE | | | REQUIRED STRUCTURAL SOIL UNDER HARDSCAPE PER SECTION | | | 94-113 AND PROVIDE THE TYPICAL DETAIL FOR INSTALLATION. | | | THE AREA MUST BE 9 X14 FT PARALLEL TO THE CURB FOR EACH | | | TREE CONSISTING OF PLANTING AREA AND/OR STRUCTURAL | | | SOIL. | | | | | | 8. SATISFIED. ROYAL PALMS SHOULD BE USED ON THE | | | LAKESIDE AND OKEECHOBEE STREETSCAPES AND LIVE OAKS ON | | | THE SOUTH DIXIE SIDE. STAFF RECOMMENDS ADDING SMALLER | | | SHADE TREES BETWEEN THE ROYAL PALMS TO PROVIDE | | | ADDITIONAL SHADE FOR THE SIDEWALKS. | | | | | | 9. SATISFIED. STREET TREES MUST MEET THE MINIMUM HEIGHT | | | OF 20 FEET AND ROYAL PALMS MUST BE AT LEAST 14 FEET OF | | | GREY WOOD TO ASSURE THE FRONDS WILL MEET THE 13.5 FEET | | | REQUIRED FOR STREET CLEARANCE. | | | | | | 10. SATISFIED. SHOW ALL EXISTING AND PROPOSED WATER AND | | | SEWER AND DRAINAGE LINES ON THE LANDSCAPE PLAN. SHOW | | | LOCATIONS OF BACKFLOWS AND ADJUST LOCATIONS OF UTILITY | | | LINES TO RESOLVE CONFLICTS WITH EXISTING AND PROPOSED | | | TREES AND LANDSCAPING. | | | | | | 11. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L. | | | PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT | | | MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT | | | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE | | | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH | | | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH | | | FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED | | | ON THE PLANT LIST. | | | | | | 12. SATISFIED. PROVIDE SCREENING HEDGES FOR ALL GROUND | | | MOUNTED VALVES AND EQUIPMENT AND ADD A NOTE THAT ALL | | | EQUIPMENT WILL BE SCREENED. | | | ADDITIONAL COMMENTS 7/21/22: | | | | | | 13. SATISFIED. REVISE THE TREE MITIGATION PROVIDED | | | CHART ON SHEET TD-1 TO INCLUDE ALL PALMS AND TREES ON | | | THE PLANT LIST INCLUDING STREET TREES. ASSIGN THE | | | CATEGORY CREDIT AND PROVIDE A TOTAL. | | | | | | 14. SATISFIED. PROVIDE PRELIMINARY APPROVAL FROM FDOT | | | FOR THE PROPOSED STREETSCAPE. | | | | | | 15. SATISFIED. ROYAL PALMS OR TREES AND THE REQUIRED | | | PLANTING STRIP SHOULD BE PLACED IN AN EXPANDED ISLAND | | | BETWEEN THE ENTRANCE AND EXIT LANES AND EAST OF THE | | | ENTRANCE ON OKEECHOBEE BLVD. | | | | | | THE COMMENT IS REGARDING THE PLANTING STRIP REQUIRED | | | ADJACENT TO THE CURB. THIS CAN BE DESIGNED TO INCLUDE | | | THE PLANTINGS IN THE ENTRANCE DESIGN. THE AREAS EAST | | | AND WEST OF THE DRIVEWAY AND A PART IN THE CENTER. | | | ADDITIONAL COMMENTS 8/22/22: | | | | | | 16. SATISFIED. THE AREA IN THE PLAZA DESIGNATED FOR AN | | | ART PIECES MUST BE SUBTRACTED FROM THE VEGETATED AREA. | | | DEPENDING ON THE SIZE OF THE BASE REQUIRED, THE | | | VEGETATED AREA WILL LIKELY FALL BELOW THE REQUIRED | | | SQUARE FOOTAGE. | | | | | | 17. SATISFIED. THE ROYAL PALMS FOR THE STREETSCAPE MUST | | | MEET THE MINIMUM 20 FOOT HEIGHT OVERALL. THIS WILL | | | ASSURE THE FRONDS WILL NOT INTERFERE WITH TRAFFIC AT 14 | | | FEET HEIGHT. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH | | | THIS PETITION. | | | | | | | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE STREETSCAPE | | | LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A | | | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
3 |
Status |
F |
Date |
08-23-2022 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
08-23-2022 |
Time |
10:11 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
08-23-2022 |
Time |
10:11 |
Sent To |
|
|
| Notes |
| 2022-08-23 10:12:17 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 320 LAKESIDE Z22050021 | | | JULY 22, 2022 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | | | | 1. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE | | | TREES AND PALMS IN GOOD CONDITION TO BE PRESERVED ON | | | SITE OR RELOCATED. ANSI A 300 (PART 5) STANDARDS | | | SPECIFY EXAMPLES OF SUITABILITY RATINGS OF GOOD, | | | MODERATE, OR POOR FOR RELOCATION. PROVIDE THE ARBORISTS | | | REPORT RATING THE CONDITION AND RELOCATION POTENTIAL | | | FOR THE NATIVE TREES AND PALMS, IT WAS NOT LOCATED IN | | | THE SUBMITTAL. NON NATIVE TREES AND PALMS ARE NOT | | | REQUIRED TO BE RELOCATED. THERE ARE 3 SABAL PALMS | | | LISTED AS GOOD CONDITION THAT MUST BE RELOCATED. | | | | | | 2. MAKE THE FOLLOWING CORRECTIONS TO THE TREE | | | DISPOSITION LIST: | | | ? SATISFIED. ONLY TREES PROPOSED TO BE REMOVED WITH A | | | CANOPY DIAMETER OF 20 FEET OR MORE SHOULD HAVE THE | | | MITIGATION SQUARE FOOTAGE CALCULATED BASED ON THE | | | ACTUAL DIAMETER. TREES LESS THAN 20 FEET CANOPY | | | DIAMETER AND PALMS SHOULD SHOW THE CATEGORY MITIGATION | | | DUE. THE TREE CATEGORY LIST IS AVAILABLE FROM CITY | | | STAFF. | | | ? SATISFIED. SHOW ONE COLUMN ON THE DISPOSITION CHART | | | FOR MITIGATION DUE FOR REMOVALS ONLY AND PROVIDE THE | | | TOTAL SQUARE FOOTAGE. | | | | | | 3. SATISFIED. THE DIAGRAM OF THE REQUIRED AND PROVIDED | | | PUBLIC AND PRIVATE OPEN SPACE AREAS FOR OBD 25 ZONING | | | DISTRICT ON SHEET LP-4 IDENTIFIES THE TYPE OF PUBLIC | | | OPEN SPACE AS PLAZA AS ALLOWED BY TABLE IV-7 AND | | | DEFINITIONS IN SECTION 94-109. THE PRIVATE OPEN SPACE | | | AREA IS IDENTIFIED AS INTERIOR COURTYARD BUT DOES NOT | | | MEET THE DEFINITION. THE OPEN SPACE TYPE SHOULD BE | | | ROOFTOP GARDEN AND THE REQUIREMENTS SHOWN. | | | 7/21/22 MAKE THE FOLLOWING CORRECTIONS: | | | ? ALL CALCULATIONS FOR PLAZA REQUIREMENTS MUST BE | | | CALCULATED BASED ON THE PROVIDED AREA OF 2010 SQ FT. | | | AND THE PROVIDE SHOWN THAT MEETS OR EXCEEDS THE | | | REQUIRED. | | | ? VEGETATED AREA OF 503 SQ FT IS REQUIRED | | | ? OVERHEAD COVER MIN IS 201 SQ FT AND MAX IS MAX IS 402 | | | SQ FT | | | ? TREE CANOPY CREDITS NEED TO BE REVISED. COCONUT PALM | | | DOES NOT QUALIFY AS A LARGE PALM. CALLIANDRA WOULD BE A | | | SMALL TREE FOR 150 SQ FT. CHANGE TO TREES THAT WILL | | | PROVIDE THE INTENDED SHADE. | | | ? FOR PRIVATE OPEN SPACE, DO NOT COUNT COCONUTS, COUNT | | | ONLY 12 EAST PALATKA HOLLY AS MEETING THE 300 SQ FT | | | EACH FOR TYPE 2: MEDIUM TREE FOR TOTAL 3600 SQ FT | | | PROVIDED AND 2819 REQUIRED. | | | ? FOR ROOFTOP GARDEN, THERE APPEARS TO BE PART OF THE | | | DESIGNATED OPEN SPACE AREA COVERED BY A ROOF AREA ON | | | THE SOUTH SIDE OF THE POOL THAT IS INCONSISTENT BETWEEN | | | SHEETS L-4 AND LP-4. | | | ? SHEET LP-2 NEEDS TO SHOW THE OUTLINE OF THE PRIVATE | | | OPEN SPACE AREA. | | | | | | 4. SATISFIED. INCLUDE A PLANT LIST OF THE TREES, SHRUBS | | | AND GROUNDCOVER PROPOSED FOR EACH OPEN SPACE AREA AND | | | SHOW THE CREDITS GIVEN FOR TREE CANOPY SQUARE FOOTAGE | | | BASED ON TABLE IV-8. | | | SEE COMMENT #3 FOR CORRECTIONS. | | | | | | 5. SATISFIED. IDENTIFY RELOCATED TREES OR PALMS ON THE | | | PLANT LIST AND COUNT THEM TOWARD THE REQUIRED TREES. | | | | | | 6. SATISFIED. PROVIDE CALCULATIONS FOR REQUIRED STREET | | | TREES AT MAXIMUM SPACING EVERY 30 FEET OR PORTION | | | THEREOF FOR EACH STREETSCAPE LENGTH, AND SHOW THE | | | NUMBER PROVIDED PER SECTION 94-113. | | | | | | 7. SATISFIED. PROVIDE LOCATIONS AND DETAIL FOR THE | | | REQUIRED STRUCTURAL SOIL UNDER HARDSCAPE PER SECTION | | | 94-113 AND PROVIDE THE TYPICAL DETAIL FOR INSTALLATION. | | | THE AREA MUST BE 9 X14 FT PARALLEL TO THE CURB FOR EACH | | | TREE CONSISTING OF PLANTING AREA AND/OR STRUCTURAL | | | SOIL. | | | | | | 8. SATISFIED. ROYAL PALMS SHOULD BE USED ON THE | | | LAKESIDE AND OKEECHOBEE STREETSCAPES AND LIVE OAKS ON | | | THE SOUTH DIXIE SIDE. STAFF RECOMMENDS ADDING SMALLER | | | SHADE TREES BETWEEN THE ROYAL PALMS TO PROVIDE | | | ADDITIONAL SHADE FOR THE SIDEWALKS. | | | | | | 9. SATISFIED. STREET TREES MUST MEET THE MINIMUM HEIGHT | | | OF 20 FEET AND ROYAL PALMS MUST BE AT LEAST 14 FEET OF | | | GREY WOOD TO ASSURE THE FRONDS WILL MEET THE 13.5 FEET | | | REQUIRED FOR STREET CLEARANCE. | | | | | | 10. SATISFIED. SHOW ALL EXISTING AND PROPOSED WATER AND | | | SEWER AND DRAINAGE LINES ON THE LANDSCAPE PLAN. SHOW | | | LOCATIONS OF BACKFLOWS AND ADJUST LOCATIONS OF UTILITY | | | LINES TO RESOLVE CONFLICTS WITH EXISTING AND PROPOSED | | | TREES AND LANDSCAPING. | | | | | | 11. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L. | | | PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT | | | MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT | | | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE | | | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH | | | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH | | | FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED | | | ON THE PLANT LIST. | | | | | | 12. SATISFIED. PROVIDE SCREENING HEDGES FOR ALL GROUND | | | MOUNTED VALVES AND EQUIPMENT AND ADD A NOTE THAT ALL | | | EQUIPMENT WILL BE SCREENED. | | | ADDITIONAL COMMENTS 7/21/22: | | | | | | 13. SATISFIED. REVISE THE TREE MITIGATION PROVIDED | | | CHART ON SHEET TD-1 TO INCLUDE ALL PALMS AND TREES ON | | | THE PLANT LIST INCLUDING STREET TREES. ASSIGN THE | | | CATEGORY CREDIT AND PROVIDE A TOTAL. | | | | | | 14. SATISFIED. PROVIDE PRELIMINARY APPROVAL FROM FDOT | | | FOR THE PROPOSED STREETSCAPE. | | | | | | 15. PARTIALLY SATISFIED. ROYAL PALMS OR TREES AND THE | | | REQUIRED PLANTING STRIP SHOULD BE PLACED IN AN EXPANDED | | | ISLAND BETWEEN THE ENTRANCE AND EXIT LANES AND EAST OF | | | THE ENTRANCE ON OKEECHOBEE BLVD. | | | | | | THE COMMENT IS REGARDING THE PLANTING STRIP REQUIRED | | | ADJACENT TO THE CURB. THIS CAN BE DESIGNED TO INCLUDE | | | THE PLANTINGS IN THE ENTRANCE DESIGN. THE AREAS EAST | | | AND WEST OF THE DRIVEWAY AND A PART IN THE CENTER. | | | ADDITIONAL COMMENTS 8/22/22: | | | | | | 16. THE AREA IN THE PLAZA DESIGNATED FOR AN ART PIECES | | | MUST BE SUBTRACTED FROM THE VEGETATED AREA. DEPENDING | | | ON THE SIZE OF THE BASE REQUIRED, THE VEGETATED AREA | | | WILL LIKELY FALL BELOW THE REQUIRED SQUARE FOOTAGE. | | | | | | 17. THE ROYAL PALMS FOR THE STREETSCAPE MUST MEET THE | | | MINIMUM 20 FOOT HEIGHT OVERALL. THIS WILL ASSURE THE | | | FRONDS WILL NOT INTERFERE WITH TRAFFIC AT 14 FEET | | | HEIGHT. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH | | | THIS PETITION. | | | | | | | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE STREETSCAPE | | | LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A | | | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
F |
Date |
07-21-2022 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
07-21-2022 |
Time |
11:23 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
07-21-2022 |
Time |
11:23 |
Sent To |
|
|
| Notes |
| 2022-07-21 11:23:37 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 320 LAKESIDE Z22050021 | | | JULY 21, 2022 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | | | | 1. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE | | | TREES AND PALMS IN GOOD CONDITION TO BE PRESERVED ON | | | SITE OR RELOCATED. ANSI A 300 (PART 5) STANDARDS | | | SPECIFY EXAMPLES OF SUITABILITY RATINGS OF GOOD, | | | MODERATE, OR POOR FOR RELOCATION. PROVIDE THE ARBORISTS | | | REPORT RATING THE CONDITION AND RELOCATION POTENTIAL | | | FOR THE NATIVE TREES AND PALMS, IT WAS NOT LOCATED IN | | | THE SUBMITTAL. NON NATIVE TREES AND PALMS ARE NOT | | | REQUIRED TO BE RELOCATED. THERE ARE 3 SABAL PALMS | | | LISTED AS GOOD CONDITION THAT MUST BE RELOCATED. | | | | | | 2. MAKE THE FOLLOWING CORRECTIONS TO THE TREE | | | DISPOSITION LIST: | | | ? SATISFIED. ONLY TREES PROPOSED TO BE REMOVED WITH A | | | CANOPY DIAMETER OF 20 FEET OR MORE SHOULD HAVE THE | | | MITIGATION SQUARE FOOTAGE CALCULATED BASED ON THE | | | ACTUAL DIAMETER. TREES LESS THAN 20 FEET CANOPY | | | DIAMETER AND PALMS SHOULD SHOW THE CATEGORY MITIGATION | | | DUE. THE TREE CATEGORY LIST IS AVAILABLE FROM CITY | | | STAFF. | | | ? SATISFIED. SHOW ONE COLUMN ON THE DISPOSITION CHART | | | FOR MITIGATION DUE FOR REMOVALS ONLY AND PROVIDE THE | | | TOTAL SQUARE FOOTAGE. | | | | | | 3. PARTIALLY SATISFIED. THE DIAGRAM OF THE REQUIRED AND | | | PROVIDED PUBLIC AND PRIVATE OPEN SPACE AREAS FOR OBD 25 | | | ZONING DISTRICT ON SHEET LP-4 IDENTIFIES THE TYPE OF | | | PUBLIC OPEN SPACE AS PLAZA AS ALLOWED BY TABLE IV-7 AND | | | DEFINITIONS IN SECTION 94-109. THE PRIVATE OPEN SPACE | | | AREA IS IDENTIFIED AS INTERIOR COURTYARD BUT DOES NOT | | | MEET THE DEFINITION. THE OPEN SPACE TYPE SHOULD BE | | | ROOFTOP GARDEN AND THE REQUIREMENTS SHOWN. | | | 7/21/22 MAKE THE FOLLOWING CORRECTIONS: | | | ? ALL CALCULATIONS FOR PLAZA REQUIREMENTS MUST BE | | | CALCULATED BASED ON THE PROVIDED AREA OF 2010 SQ FT. | | | AND THE PROVIDE SHOWN THAT MEETS OR EXCEEDS THE | | | REQUIRED. | | | ? VEGETATED AREA OF 503 SQ FT IS REQUIRED | | | ? OVERHEAD COVER MIN IS 201 SQ FT AND MAX IS MAX IS 402 | | | SQ FT | | | ? TREE CANOPY CREDITS NEED TO BE REVISED. COCONUT PALM | | | DOES NOT QUALIFY AS A LARGE PALM. CALLIANDRA WOULD BE A | | | SMALL TREE FOR 150 SQ FT. CHANGE TO TREES THAT WILL | | | PROVIDE THE INTENDED SHADE. | | | ? FOR PRIVATE OPEN SPACE, DO NOT COUNT COCONUTS, COUNT | | | ONLY 12 EAST PALATKA HOLLY AS MEETING THE 300 SQ FT | | | EACH FOR TYPE 2: MEDIUM TREE FOR TOTAL 3600 SQ FT | | | PROVIDED AND 2819 REQUIRED. | | | ? FOR ROOFTOP GARDEN, THERE APPEARS TO BE PART OF THE | | | DESIGNATED OPEN SPACE AREA COVERED BY A ROOF AREA ON | | | THE SOUTH SIDE OF THE POOL THAT IS INCONSISTENT BETWEEN | | | SHEETS L-4 AND LP-4. | | | ? SHEET LP-2 NEEDS TO SHOW THE OUTLINE OF THE PRIVATE | | | OPEN SPACE AREA. | | | | | | 4. PARTIALLY SATISFIED. INCLUDE A PLANT LIST OF THE | | | TREES, SHRUBS AND GROUNDCOVER PROPOSED FOR EACH OPEN | | | SPACE AREA AND SHOW THE CREDITS GIVEN FOR TREE CANOPY | | | SQUARE FOOTAGE BASED ON TABLE IV-8. | | | SEE COMMENT #3 FOR CORRECTIONS. | | | | | | 5. SATISFIED. IDENTIFY RELOCATED TREES OR PALMS ON THE | | | PLANT LIST AND COUNT THEM TOWARD THE REQUIRED TREES. | | | | | | 6. SATISFIED. PROVIDE CALCULATIONS FOR REQUIRED STREET | | | TREES AT MAXIMUM SPACING EVERY 30 FEET OR PORTION | | | THEREOF FOR EACH STREETSCAPE LENGTH, AND SHOW THE | | | NUMBER PROVIDED PER SECTION 94-113. | | | | | | 7. SATISFIED. PROVIDE LOCATIONS AND DETAIL FOR THE | | | REQUIRED STRUCTURAL SOIL UNDER HARDSCAPE PER SECTION | | | 94-113 AND PROVIDE THE TYPICAL DETAIL FOR INSTALLATION. | | | THE AREA MUST BE 9 X14 FT PARALLEL TO THE CURB FOR EACH | | | TREE CONSISTING OF PLANTING AREA AND/OR STRUCTURAL | | | SOIL. | | | | | | 8. SATISFIED. ROYAL PALMS SHOULD BE USED ON THE | | | LAKESIDE AND OKEECHOBEE STREETSCAPES AND LIVE OAKS ON | | | THE SOUTH DIXIE SIDE. STAFF RECOMMENDS ADDING SMALLER | | | SHADE TREES BETWEEN THE ROYAL PALMS TO PROVIDE | | | ADDITIONAL SHADE FOR THE SIDEWALKS. | | | | | | 9. SATISFIED. STREET TREES MUST MEET THE MINIMUM HEIGHT | | | OF 20 FEET AND ROYAL PALMS MUST BE AT LEAST 14 FEET OF | | | GREY WOOD TO ASSURE THE FRONDS WILL MEET THE 13.5 FEET | | | REQUIRED FOR STREET CLEARANCE. | | | | | | 10. SATISFIED. SHOW ALL EXISTING AND PROPOSED WATER AND | | | SEWER AND DRAINAGE LINES ON THE LANDSCAPE PLAN. SHOW | | | LOCATIONS OF BACKFLOWS AND ADJUST LOCATIONS OF UTILITY | | | LINES TO RESOLVE CONFLICTS WITH EXISTING AND PROPOSED | | | TREES AND LANDSCAPING. | | | | | | 11. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L. | | | PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT | | | MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT | | | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE | | | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH | | | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH | | | FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED | | | ON THE PLANT LIST. | | | | | | 12. SATISFIED. PROVIDE SCREENING HEDGES FOR ALL GROUND | | | MOUNTED VALVES AND EQUIPMENT AND ADD A NOTE THAT ALL | | | EQUIPMENT WILL BE SCREENED. | | | ADDITIONAL COMMENTS 7/21/22: | | | | | | 13. REVISE THE TREE MITIGATION PROVIDED CHART ON SHEET | | | TD-1 TO INCLUDE ALL PALMS AND TREES ON THE PLANT LIST | | | INCLUDING STREET TREES. ASSIGN THE CATEGORY CREDIT AND | | | PROVIDE A TOTAL. | | | | | | 14. PROVIDE PRELIMINARY APPROVAL FROM FDOT FOR THE | | | PROPOSED STREETSCAPE. | | | | | | 15. ROYAL PALMS OR TREES AND THE REQUIRED PLANTING | | | STRIP SHOULD BE PLACED IN AN EXPANDED ISLAND BETWEEN | | | THE ENTRANCE AND EXIT LANES AND EAST OF THE ENTRANCE ON | | | OKEECHOBEE BLVD. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH | | | THIS PETITION. | | | | | | | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE STREETSCAPE | | | LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A | | | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
06-07-2022 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
06-07-2022 |
Time |
16:48 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
06-07-2022 |
Time |
16:48 |
Sent To |
|
|
| Notes |
| 2022-06-07 16:48:24 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 320 LAKESIDE Z22050021 | | | JUNE 7, 2022 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | | | | 1. SECTION 94-448 (D)(3) REQUIRES NATIVE TREES AND | | | PALMS IN GOOD CONDITION TO BE PRESERVED ON SITE OR | | | RELOCATED. ANSI A 300 (PART 5) STANDARDS SPECIFY | | | EXAMPLES OF SUITABILITY RATINGS OF GOOD, MODERATE, OR | | | POOR FOR RELOCATION. PROVIDE THE ARBORISTS REPORT | | | RATING THE CONDITION AND RELOCATION POTENTIAL FOR THE | | | NATIVE TREES AND PALMS, IT WAS NOT LOCATED IN THE | | | SUBMITTAL. NON NATIVE TREES AND PALMS ARE NOT REQUIRED | | | TO BE RELOCATED. THERE ARE 3 SABAL PALMS LISTED AS GOOD | | | CONDITION THAT MUST BE RELOCATED. | | | | | | 2. MAKE THE FOLLOWING CORRECTIONS TO THE TREE | | | DISPOSITION LIST: | | | ? ONLY TREES PROPOSED TO BE REMOVED WITH A CANOPY | | | DIAMETER OF 20 FEET OR MORE SHOULD HAVE THE MITIGATION | | | SQUARE FOOTAGE CALCULATED BASED ON THE ACTUAL DIAMETER. | | | TREES LESS THAN 20 FEET CANOPY DIAMETER AND PALMS | | | SHOULD SHOW THE CATEGORY MITIGATION DUE. THE TREE | | | CATEGORY LIST IS AVAILABLE FROM CITY STAFF. | | | ? SHOW ONE COLUMN ON THE DISPOSITION CHART FOR | | | MITIGATION DUE FOR REMOVALS ONLY AND PROVIDE THE TOTAL | | | SQUARE FOOTAGE. | | | | | | 3. THE DIAGRAM OF THE REQUIRED AND PROVIDED PUBLIC AND | | | PRIVATE OPEN SPACE AREAS FOR OBD 25 ZONING DISTRICT ON | | | SHEET LP-4 IDENTIFIES THE TYPE OF PUBLIC OPEN SPACE AS | | | PLAZA AS ALLOWED BY TABLE IV-7 AND DEFINITIONS IN | | | SECTION 94-109. THE PRIVATE OPEN SPACE AREA IS | | | IDENTIFIED AS INTERIOR COURTYARD BUT DOES NOT MEET THE | | | DEFINITION. THE OPEN SPACE TYPE SHOULD BE ROOFTOP | | | GARDEN AND THE REQUIREMENTS SHOWN. | | | | | | 4. INCLUDE A PLANT LIST OF THE TREES, SHRUBS AND | | | GROUNDCOVER PROPOSED FOR EACH OPEN SPACE AREA AND SHOW | | | THE CREDITS GIVEN FOR TREE CANOPY SQUARE FOOTAGE BASED | | | ON TABLE IV-8. | | | | | | 5. IDENTIFY RELOCATED TREES OR PALMS ON THE PLANT LIST | | | AND COUNT THEM TOWARD THE REQUIRED TREES. | | | | | | 6. PROVIDE CALCULATIONS FOR REQUIRED STREET TREES AT | | | MAXIMUM SPACING EVERY 30 FEET OR PORTION THEREOF FOR | | | EACH STREETSCAPE LENGTH, AND SHOW THE NUMBER PROVIDED | | | PER SECTION 94-113. | | | | | | 7. PROVIDE LOCATIONS AND DETAIL FOR THE REQUIRED | | | STRUCTURAL SOIL UNDER HARDSCAPE PER SECTION 94-113 AND | | | PROVIDE THE TYPICAL DETAIL FOR INSTALLATION. THE AREA | | | MUST BE 9 X14 FT PARALLEL TO THE CURB FOR EACH TREE | | | CONSISTING OF PLANTING AREA AND/OR STRUCTURAL SOIL. | | | | | | 8. ROYAL PALMS SHOULD BE USED ON THE LAKESIDE AND | | | OKEECHOBEE STREETSCAPES AND LIVE OAKS ON THE SOUTH | | | DIXIE SIDE. STAFF RECOMMENDS ADDING SMALLER SHADE TREES | | | BETWEEN THE ROYAL PALMS TO PROVIDE ADDITIONAL SHADE FOR | | | THE SIDEWALKS. | | | | | | 9. STREET TREES MUST MEET THE MINIMUM HEIGHT OF 20 FEET | | | AND ROYAL PALMS MUST BE AT LEAST 14 FEET OF GREY WOOD | | | TO ASSURE THE FRONDS WILL MEET THE 13.5 FEET REQUIRED | | | FOR STREET CLEARANCE. | | | | | | 10. SHOW ALL EXISTING AND PROPOSED WATER AND SEWER AND | | | DRAINAGE LINES ON THE LANDSCAPE PLAN. SHOW LOCATIONS OF | | | BACKFLOWS AND ADJUST LOCATIONS OF UTILITY LINES TO | | | RESOLVE CONFLICTS WITH EXISTING AND PROPOSED TREES AND | | | LANDSCAPING. | | | | | | 11. SHOW COMPLIANCE WITH SECTION 94-445 L. PLANT | | | SPECIES. A MINIMUM OF 60 PERCENT OF PLANT MATERIAL | | | ADDED SHALL BE FLORIDA NATIVE OR DROUGHT TOLERANT | | | SPECIES SELECTED FROM THE CITY LIST OR THE LIST OF | | | SPECIES IN THE MOST RECENT EDITION OF SOUTH FLORIDA | | | WATER MANAGEMENT DISTRICT WATERWISE SOUTH FLORIDA | | | LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED ON THE | | | PLANT LIST. | | | | | | 12. PROVIDE SCREENING HEDGES FOR ALL GROUND MOUNTED | | | VALVES AND EQUIPMENT AND ADD A NOTE THAT ALL EQUIPMENT | | | WILL BE SCREENED. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH | | | THIS PETITION. | | | | | | | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE STREETSCAPE | | | LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A | | | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | | | | |
|
|
| Review Stop |
PU |
PUBLIC UTILITIES |
| Rev No |
3 |
Status |
P |
Date |
10-11-2022 |
|
|
Cont ID |
|
| Sent By |
mtechnow |
Date |
10-11-2022 |
Time |
13:29 |
Rev Time |
0.00 |
| Received By |
mtechnow |
Date |
10-11-2022 |
Time |
13:29 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PU |
PUBLIC UTILITIES |
| Rev No |
2 |
Status |
F |
Date |
07-14-2022 |
|
|
Cont ID |
|
| Sent By |
mtechnow |
Date |
07-14-2022 |
Time |
17:12 |
Rev Time |
0.00 |
| Received By |
mtechnow |
Date |
07-14-2022 |
Time |
16:52 |
Sent To |
|
|
| Notes |
| 2022-07-14 17:00:13 | -CALL OUT POINT OF SERVICE AND SHOW THE UTILITY LINES | | | WITHIN THE PROPERTY AS PRIVATE WHERE APPLICABLE. | | | -ON DEMO SHEET ADD NOTE TO "CUT AND CAP AT THE MAIN" | | | FOR ALL EXISTING WATER SERVICES AND SANITARY LATERALS | | | TO BE ABANDONED. | | | - PROVIDE CALCULATIONS ON PLANS OF EXISTING AND | | | PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM | | | AND PEAK) AND FIRE FLOW DEMANDS ON PLAN SHEET. | | | CALCULATIONS SHALL BE PER FAC 64E-6 FOR SEWER AND PER | | | FAC 64-E.008 FOR WATER. | | | -SHOW STATIONING AND HORIZONTAL SEPARATION CLEARANCE | | | BETWEEN PROPOSED UTILITIES AND EXISTING UTILITIES | | | AND/OR BASELINE. | | | |
|
|
| Review Stop |
PU |
PUBLIC UTILITIES |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
mtechnow |
Date |
06-07-2022 |
Time |
16:40 |
Sent To |
|
|
| Notes |
| 2022-06-07 16:42:43 | -PER VINCE NOEL'S COMMENTS WILL WAIT FOR REDESIGNED | | | PLANS. | | | | | | MIKE TECHNOW - [email protected] |
|
|
| Review Stop |
PU-CS |
PUBLIC UTILITIES CUSTOMER SRVC |
| Rev No |
4 |
Status |
P |
Date |
09-23-2022 |
|
|
Cont ID |
|
| Sent By |
mhurley |
Date |
09-23-2022 |
Time |
16:06 |
Rev Time |
0.00 |
| Received By |
mhurley |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PU-CS |
PUBLIC UTILITIES CUSTOMER SRVC |
| Rev No |
3 |
Status |
F |
Date |
08-16-2022 |
|
|
Cont ID |
|
| Sent By |
mhurley |
Date |
08-16-2022 |
Time |
15:22 |
Rev Time |
0.00 |
| Received By |
mhurley |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-08-16 15:22:12 | PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING: | | | | | | -NOT SATISFIED WITH RESPONSE TO REVIEW COMMENT NUMBER 4 | | | IN LETTER DATED 12AUG2022. BACKFLOW ASSEMBLY LOCATIONS | | | ARE NOT ACCEPTABLE. THE MOST CONCERNING IS THE LONG | | | DISTANCE FROM THE METERS, POINT OF SERVICE, AND | | | PROPERTY LINES. NEED DISTANCE REDUCED SUBSTANTIALLY ON | | | THEM. | | | | | | -PAVEMENT RESTORATION BOUNDARIES IN RIGHT OF WAY MAY | | | STILL BE SMALLER THAN REQUIRED. WILL REVIEW FURTHER AT | | | ENGINEERING DEVELOPMENT SUBMITTAL. | | | | | | -WILL REVIEW CUT AND CAP LOCATIONS AT ENGINEERING | | | DEVELOPMENT SUBMITTAL. MAY HAVE TO CUT BACK FURTHER | | | THAN PROPOSED. | | | | | | -AS REQUESTED IN RESPONSE FOR REVIEW COMMENT NUMBER 9 | | | IN LETTER DATED 12AUG2022, MORE INFO ABOUT DIMENSIONS | | | AND FOOTPRINT OF LARGE METERED WATER SERVICES CAN BE | | | FOUND IN WPB STANDARD DETAILS WS4, WS4.1, AND AWWA M6 | | | MANUAL PG 49 TABLE 4 DASH 1. | | | | | | -ENSURE THAT ANY LIGHT POSTS IN LT1 ARE LOCATED MINIMUM | | | 3 FEET AWAY FROM UTILITIES SUCH AS WATER METER BOXES. | | | | | | RESPECTFULLY, | | | | | | MARK HURLEY | | | [email protected] | | | |
|
|
| Review Stop |
PU-CS |
PUBLIC UTILITIES CUSTOMER SRVC |
| Rev No |
2 |
Status |
F |
Date |
07-14-2022 |
|
|
Cont ID |
|
| Sent By |
mhurley |
Date |
07-14-2022 |
Time |
11:08 |
Rev Time |
0.00 |
| Received By |
mhurley |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-07-14 11:08:00 | -STILL COULD NOT FIND VISUAL BOUNDARIES OF PAVEMENT | | | RESTORATION ON THE ADJACENT ROADWAYS WHERE UTILITY | | | EXCAVATION IS PROPOSED. PLEASE MAKE SURE COMPLIES WITH | | | OVERSEEING AGENCY REQUIREMENTS AND SHOW ON CIVIL PLANS. | | | -THERE ARE STILL MANY UNACCOUNTED FOR UTILITIES SUCH AS | | | METERED WATER SERVICES AND SEWER LATERALS WHERE REMOVAL | | | IS NOT SHOWN ON DEMO OR UTILITY PLANS. WILL LIKELY NEED | | | TO GO INTO DIXIE HWY FOR SOME OF THAT REMOVAL. | | | -COULD NOT FIND THE WORDING ABOVE GROUND ON LABELS FOR | | | PROPOSED 3 INCH AND LARGER WATER METERS. PLEASE ADD TO | | | CIVIL PLANS. SHEET C300 SHOWS AT LEAST THREE SUCH | | | METERS. | | | -BACKFLOW LOCATIONS ARE NOT ACCEPTABLE. THE MOST | | | CONCERNING IS THE LONG DISTANCE FROM THE METERS, POINTS | | | OF SERVICE, AND PROPERTY LINES. NEED DISTANCE REDUCED | | | SUBSTANTIALLY ON THEM. | | | -IF FIRE HYDRANT NEAR NORTH PROPERTY LINE IS NOT | | | EXISTING, ADD WORDING PROPOSED ON LABEL. IF PROPOSED IT | | | DOES NOT SEEM TO MEET REQUIREMENTS OF NOTE 3 ON WPB | | | STANDARD DETAIL P8. | | | -320 LAKEVIEW AVE IS LISTED IN UTILITY BILLING SYSTEM | | | AS HAVING EXISTING 6 INCH FIRELINE. SHOW AND LABEL ON | | | CIVIL PLANS. | | | -WILL 3 X 10 FPLE IN FAR NE CORNER OF PROPERTY REMAIN? | | | -PLEASE ADD VISUAL GRAPHIC MEASUREMENT SCALES TO | | | ENLARGEMENTS ON SHEET C300. | | | -FOOTPRINTS OF THE 3 AND 4 INCH METERED WATER SERVICES | | | ARE LIKELY MUCH LARGER THAN SHOWN ON SHEET C300. | | | REFERENCE WPB SD WS3 FOR SOME UNDERSTANDING OF | | | DIMENSIONS. | | | -ANY PROPOSED CHANGES TO CITY WPB STREET LIGHTING OR | | | IRRIGATION ELECTRIC PANELS REQUIRES SEPARATE APPROVAL. | | | -APPLICANT SHOULD BE AWARE THAT THERE ARE OVERHEAD | | | UTILITIES RUNNING FROM PROPERTY SOUTH ACROSS | | | OKEECHOBEE. | | | -ARE THE STREET LIGHTS AT NORTH AND SOUTH SIDES OF | | | PROPERTY INTENDED TO REMAIN? | | | -WILL THE BIKE RACKS AND STREET FURNITURE SHOWN ON LH1 | | | PREVENT OR IMPEDE USE OF THE PROPOSED SIDEWALKS? ON | | | A1.01 THEY LOOK FINE SO PLEASE ALSO MAKE SURE PLAN | | | LOCATIONS MATCH. | | | -PROPOSED WATER SERVICE DESIGNS ARE NONSTANDARD AND MAY | | | NEED ADJUSTMENT UPON FURTHER REVIEW AT ENGINEERING | | | DEVELOPMENT SUBMITTAL. FURTHERMORE THE PROPOSED | | | LOCATIONS OF THE WATER SERVICES MAY CONFLICT WITH OTHER | | | PROJECT ELEMENTS. RECOMMEND FURTHER REFINEMENT OF WATER | | | SERVICES DURING PPRC TO PREVENT FUTURE PROBLEMS. CAN | | | CONTACT [email protected] FOR SOME ASSISTANCE OR | | | GUIDANCE. | | | -SHEETS C102 AND C103 SHOWS TRUCKS ENTERING NORTH | | | ENTRANCE FROM THE EAST, BUT IT WOULD SEEM THAT MOST | | | TRUCKS WOULD ORIGINATE FROM THE WEST NEAR I95 TRAVELING | | | EAST. IS THE INTENT FOR TRUCKS TO GO AROUND THE BLOCK | | | FIRST, AND IF SO, HOW WILL THEY KNOW TO DO THAT BEFORE | | | TURNING INTO SOUTHERN ENTRANCE? | | | -SHEET C104 REFUSE TRUCK SIDE LOOKS LIKE A SMALL CAR | | | WAS USED FOR DIAGRAM INSTEAD OF A LARGER REFUSE TRUCK. | | | |
|
|
| Review Stop |
PU-CS |
PUBLIC UTILITIES CUSTOMER SRVC |
| Rev No |
1 |
Status |
F |
Date |
06-08-2022 |
|
|
Cont ID |
|
| Sent By |
mhurley |
Date |
06-08-2022 |
Time |
13:56 |
Rev Time |
0.00 |
| Received By |
mhurley |
Date |
06-08-2022 |
Time |
13:55 |
Sent To |
|
|
| Notes |
| 2022-06-08 13:56:11 | -VERTICAL BACKFLOW ASSEMBLIES ARE NONSTANDARD AND | | | SUBJECT TO FURTHER REVIEW AT FORMAL ENGINEERING | | | SUBMITTAL. | | | | | | -WHAT IS THE CLEARANCE DISTANCE BETWEEN PROPOSED | | | EASTERN BUILDING WALLS AND EXISTING BUILDING WALLS OF | | | 801 S. OLIVE? | | | | | | -WHAT IS HAPPENING TO THE EXISTING BELLSOUTH AND | | | INGRESS EGRESS EASEMENTS? IF THEY ARE REMAINING, VERIFY | | | APPLICANT HAS APPROVAL TO BUILD STRUCTURES IN THEM. | | | | | | -COULD NOT FIND GREASE TRAP FOR CAF? AND RESTAURANT ON | | | ENGINEERING PLAN. WHERE WILL THEY BE LOCATED? | | | | | | -WATER UTILITY DESIGN IS NOT ACCEPTABLE. NEED DOMESTIC | | | METER OUTSIDE BUILDING FOOTPRINT AND CLOSE TO PROPERTY | | | LINE. CITY WATER MAIN SHOULD NOT TRAVERSE PROPERTY AND | | | BE UNDER A BUILDING. | | | | | | -PAVEMENT RESTORATION OF OKEECHOBEE AND LAKEVIEW ARE | | | NOT SHOWN. | | | | | | -SHOW EXISTING UTILITIES AND LABEL WHAT IS HAPPENING TO | | | THEM. | | | | | | -VERIFY EXISTING SEWER MAIN SIZING IS SUFFICIENT. | | | | | | -WPB GIS SAYS SOME EXISTING SEWER MAINS IN AREA ARE | | | OLDER. APPLICANT MAY BE REQUIRED TO IMPROVE THEM AS | | | ADVISED BY CITY OR ENGINEER OF RECORD. | | | | | | -DOMESTIC WATER METER NEEDS TO BE INSTALLED ABOVE | | | GROUND PER STANDARD DETAIL WS3 IF SIZED 3 INCH OR | | | LARGER. SHOW AND LABEL IT ON ENGINEERING PLAN. | | | | | | -DOMESTIC RPZ NEEDS TO BE OUTSIDE BUILDING, AND CLOSE | | | TO PROPERTY LINE AND DOMESTIC WATER METER. | | | | | | -ADD STANDARD DETAIL P8 TO ENGINEERING PLAN SET, AND | | | VERIFY PROPOSED FIRE HYDRANT LOCATION MEETS | | | REQUIREMENTS OF P8. | | | | | | -CANNOT READ NUMBER UNITS ON VISUAL SCALE MEASUREMENT | | | ICON ON UTILITY PLAN. PLEASE MAKE READABLE. | | | | | | -ADD STANDARD DETAIL WS3 TO ENGINEERING PLAN SET. | | | | | | -SHOW AND LABEL ANY EXISTING OR PROPOSED EASEMENTS | | | INCLUDING SIDEWALK EASEMENTS AND UTILITY EASEMENTS. | | | | | | -JUSTIFICATION STATEMENT STATED: HOWEVER, THE INTERIOR | | | CEILING AND EXTERIOR PILASTERS CURRENTLY A PART OF THE | | | BUILDING AT 320 LAKEVIEW WILL BE PRESERVED AND REUSED | | | IN THE DESIGN OF THE GROUND FLOOR COMMERCIAL SPACE AS | | | DISCUSSED WITH FRIEDERIKE MITTNER, CITY HISTORIC | | | PRESERVATION PLANNER. PLEASE ADD THAT NOTE TO | | | DEMOLITION PLAN AND SHOW WHERE THOSE ARE LOCATED. | | | | | | -ENSURE THAT THE CIVIL PLANS, LANDSCAPING PLANS, AND | | | ARCHITECTURE PLANS MATCH WITH REGARDS TO GENERAL DESIGN | | | LAYOUT. THE HARDSCAPE AND LANDSCAPE AREAS NEAR THE | | | PROPERTY LINES SEEM DIFFERENT. | | | |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
4 |
Status |
P |
Date |
09-26-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
09-26-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
09-26-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-09-26 15:03:42 | CONDITION OF APPROVAL: THE ROLL OUT CONTAINERS SHALL BE | | | FRONT LOAD TYPE IN ORDER TO BE COMPATIBLE WITH THE | | | CITY`S REFUSE COLLECTION VEHICLES. | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
3 |
Status |
F |
Date |
09-01-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
09-01-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
09-01-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-09-01 10:28:40 | PLEASE PROVIDE THE FOLLOWINGS: | | | 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID | | | WASTE VOLUME PRODUCED ALONG WITH THE SIZE, TYPE AND | | | QUANTITY OF THE CONTAINER (I.E. DUMPSTER/COMPACTOR) | | | THAT WILL BE UTILIZED FOR THE SANITATION SERVICE. | | | 2- STAGING/LOADING AREA HEIGHT CLEARANCE SHALL BE 25 FT | | | OR THE CONTAINERS SHALL BE ROLLED TO TO THE CURBSIDE | | | FOR SERVICE; THE STAGING AREA FOR ROLLOUT CONTAINERS TO | | | BE DETERMINED BY DEPARTMENT OF PUBLIC WORKS. | | | | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
2 |
Status |
F |
Date |
07-15-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
07-15-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
07-15-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-07-15 11:21:48 | PLEASE PROVIDE THE FOLLOWINGS: | | | 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID | | | WASTE VOLUME PRODUCED ALONG WITH THE SIZE, TYPE AND | | | QUANTITY OF THE CONTAINER (I.E. DUMPSTER/COMPACTOR) | | | THAT WILL BE UTILIZED FOR THE SANITATION SERVICE. | | | 2- STAGING/LOADING AREA HEIGHT CLEARANCE SHALL BE 25 FT | | | OR THE CONTAINERS SHALL BE ROLLED TO TO THE CURBSIDE | | | FOR SERVICE; THE STAGING AREA FOR ROLLOUT CONTAINERS TO | | | BE DETERMINED BY DEPARTMENT OF PUBLIC WORKS. | | | 3- CONTINGENCY PLAN, FOR WHEN THE COMPACTOR IS OUT OF | | | SERVICE (I.E. CITY DUMPSTER, ROLL-OFF CONTAINER) | | | 4- DESIGNATED LOCATION FOR THE BULK ITEM PICK UP AND | | | RECYCLING CONTAINERS | | | 5- IN CASE OF PROPOSING ADDITION OF ANY NEW CAN(S) IN | | | THE CITY`S RIGHT-OF-WAY , THE LOCATION AND QUANTITY OF | | | THE CAN(S) SHALL BE REVIEWED AND APPROVED BY PUBLIC | | | WORKS DEPARTMENT AND THE CAN(S) SHALL BE TYPE, SIZE AND | | | COLOR APPROVED BY PUBLIC WORKS DEPARTMENT. THE BUILDING | | | MAINTENANCE IS RESPONSIBLE TO MAINTAIN AND SERVICE THE | | | CAN(S). | | | 6- ALL THE PARKING STALL PAINTING SHALL COMPLY WITH THE | | | CITY`S MUNICIPAL CODE SECTION 94-485 AND FLORIDA | | | STATUES [553.5041 F.S.]. | | | 7- ALL STRIPING AND SIGNAGE SHALL MEET THE M.U.T.C.D. | | | LATEST EDITION. | | | ALL PAVEMENT MARKING AND SIGNING DAMAGED DURING | | | CONSTRUCTION SHALL BE RESTORED. | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
F |
Date |
06-06-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
06-06-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
06-06-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-06-06 09:45:19 | PLEASE PROVIDE THE FOLLOWINGS: | | | 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID | | | WASTE VOLUME PRODUCED ALONG WITH THE SIZE, TYPE AND | | | QUANTITY OF THE CONTAINER (I.E. DUMPSTER/COMPACTOR) | | | THAT WILL BE UTILIZED FOR THE SANITATION SERVICE. | | | 2- STAGING/LOADING AREA HEIGHT CLEARANCE FOR THE | | | COMPACTORS` ROLL OUT CONTAINERS TO BE SERVICED BY THE | | | FRONT LOAD SANITATION COLLECTION TRUCK. | | | 3-TRASH HOLDING ROOM DETAIL ALONG WITH THE TRASH | | | COMPACTOR(S) UNIT SPECS. | | | 4- CONTINGENCY PLAN, FOR WHEN THE COMPACTOR IS OUT OF | | | SERVICE (I.E. CITY DUMPSTER, ROLL-OFF CONTAINER) | | | 5- DESIGNATED LOCATION FOR THE BULK ITEM PICK UP AND | | | RECYCLING CONTAINERS | | | 6- OWNERS AND/OR OCCUPANTS OF PROPERTY THAT REQUIRE | | | GREASE HAULING SERVICES SHALL ENSURE THAT THEIR GREASE | | | TANKS OR CONTAINERS REMAIN CLEAN, AND ARE ENCLOSED AND | | | NOT IN PUBLIC VIEW. | | | 7- IN CASE OF PROPOSING ADDITION OF ANY NEW CAN(S) IN | | | THE CITY`S RIGHT-OF-WAY , THE LOCATION AND QUANTITY OF | | | THE CAN(S) SHALL BE REVIEWED AND APPROVED BY PUBLIC | | | WORKS DEPARTMENT AND THE CAN(S) SHALL BE TYPE, SIZE AND | | | COLOR APPROVED BY PUBLIC WORKS DEPARTMENT. THE BUILDING | | | MAINTENANCE IS RESPONSIBLE TO MAINTAIN AND SERVICE THE | | | CAN(S). | | | | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
3 |
Status |
P |
Date |
10-04-2022 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
09-29-2022 |
Time |
15:58 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
10-04-2022 |
Time |
09:34 |
Sent To |
|
|
| Notes |
| 2022-09-29 16:00:36 | CONDITIONS FOR SITE PLAN APPROVAL ARE LISTED AT THE | | | END. | | | | | | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 9/23/2022 SUBMITTAL: | | | | | | 3. [PARTIALLY SATISFIED] PROVIDE A TRENCH DRAIN ALONG | | | THE WEST PROPERTY LINE TO INTERCEPT RUNOFF. ADDITIONAL | | | COMMENTS: LANDSCAPE AREA SHOULD BE GRADED TO STORE | | | RUNOFF (SWALE SECTION). PUBLIC OPEN SPACE AND SIDEWALK | | | SHOULD BE GRADED TO DRAIN TO DS-04 AND DS-05. DS-04 | | | SHOULD BE IN A DEPRESSION TO COLLECT THE RUNOFF FROM | | | THE OPEN SPACE AREA. | | | | | | 5. [SATISFIED] PROVIDE CROSS SECTIONS FROM CENTERLINE | | | OF RIGHTS OF WAY TO FACE OF BUILDING. SHOW BREAK | | | POINTS, DISTANCES FROM BACK OF CURB TO PROPERTY LINE, | | | FROM PROPERTY LINE TO FACE OF BUILDING, WIDTH OF | | | SIDEWALK, CURB, ETC. LABEL THE RIGHT OF WAY (OKEECHOBEE | | | BLVD, LAKEVIEW AVE, S. DIXIE HWY). ADDITIONAL COMMENTS: | | | THE CROSS SECTIONS WILL SHOW HOW THE SIDEWALK AREAS AND | | | DRIVEWAY APRONS WILL BE GRADED TO MEET A.D.A. CRITERIA. | | | THE CONTOURING ON THE PAVING AND GRADING PLAN APPEAR TO | | | RESULT IN SIDEWALK CROSS SLOPES STEEPER THAN 2%. | | | | | | 6. [SATISFIED] PROVIDE EXISTING SPOT GRADES ALONG EDGES | | | OF PAVEMENT. ADDITIONAL COMMENT: WHERE DID THE EXISTING | | | SPOT GRADES COME FROM? THEY DO NOT APPEAR ON THE | | | SURVEY. | | | | | | 7. [PARTIALLY SATISFIED] PROVIDE PROPOSED FINISHED | | | FLOOR ELEVATION. ADDITIONAL COMMENT: PROVIDE THE FFE'S | | | ON THE CIVIL PLANS. | | | | | | 8. [PARTIALLY SATISFIED] PROVIDE A DETAIL FOR THE | | | EXFILTRATION TRENCH. LABEL THE WIDTH AND ELEVATIONS OF | | | THE TOP AND BOTTOM OF THE TRENCH. ADDITIONAL COMMENT: | | | REQUESTED INFORMATION CAN BE PROVIDED WITH THE | | | ENGINEERING PERMIT SUBMITTAL. | | | | | | 9. [NOT SATISFIED] PROVIDE A DETAIL FOR THE CONTROL | | | STRUCTURE. THE CITY DOES NOT ALLOW THE USE OF BLEEDERS | | | WITH EXFILTRATION TRENCH SYSTEMS. ADDITIONAL COMMENT: | | | CONTROL STRUCTURE DETAIL CAN BE PROVIDED WITH THE | | | ENGINEERING PERMIT SUBMITTAL. | | | | | | 10. [SATISFIED] MINIMUM DIAMETER OF STORM PIPE TO BE | | | INSTALLED IN THE RIGHT OF WAY IS 15 INCH RCP. | | | ADDITIONAL COMMENT: PVC PIPE FROM DS-04 SHOULD BE RCP. | | | | | | NEW COMMENTS (7-5-2022 SUBMTITAL): | | | | | | 11. [SATISFIED] CONTOURING OF SIDEWALK APPEARS TO | | | RESULT IN CROSS SLOPES STEEPER THAN 2%. | | | | | | 12. [PARTIALLY SATISFIED] REPLACE ALL DROP CURB OF | | | EXISTING DRIVEWAYS WITH TYPE F CURB AND GUTTER. | | | ADDITIONAL COMMENT: REPLACE THREE SECTIONS OF DROP CURB | | | ON S. DIXIE HWY AND ONE SECTION OF DROP CURB ON | | | OKEECHOBEE BLVD WITH TYPE F C&G. LABEL ALL NEW C & G ON | | | THE PAVING AND GRADING PLAN. | | | | | | 13. [PARTIALLY SATISFIED] INCLUDE IN THE LEGEND OF THE | | | PAVING AND GRADING PLAN THE SPOT GRADE SYMBOLS AND | | | CONTOUR LINE SYMBOL. USE A DIFFERENT SYMBOL FOR | | | EXISTING SPOT GRADES. ADDITIONAL COMMENT: SAME SYMBOLS | | | WERE USED FOR PROPOSED AND EXISTING SPOT GRADES. | | | | | | 14. [SATISFIED] SHOW AND LABEL THE DRAINAGE CONTROL | | | STRUCTURE. | | | | | | 15. [PARTIALLY SATISFIED] INDICATE HOW WATER QUALITY | | | TREATMENT WILL BE PROVIDED FOR THE RUNOFF FROM THE | | | NORTHWEST CORNER OF THE SITE (DRAINING TO DS-04 AND | | | DS-05). ADDITIONAL COMMENT ??? SEE NEW COMMENT #22 | | | BELOW. | | | | | | 16. [SATISFIED] ENSURE THERE IS ADEQUATE VERTICAL | | | CLEARANCE WITHIN THE BUILDING TO BE ABLE TO SERVICE THE | | | EXFILTRATION TRENCHES AND DRAINAGE STRUCTURES AND TO BE | | | ABLE TO REPLACE THE EXFILTRATION TRENCHES WHEN THEY ARE | | | NO LONGER FUNCTIONING AS INTENDED. | | | | | | 17. [SATISFIED] CONSIDER INCORPORATING LOW IMPACT | | | DEVELOPMENT DRAINAGE SYSTEMS IN LIEU OR IN ADDITION TO | | | THE EXFILTRATION TRENCHES. | | | | | | 18. [SATISFIED] REFERENCE FDOT STANDARD PLAN NUMBERS | | | INSTEAD OF FDOT STANDARD INDEX NUMBERS. | | | | | | NEW COMMENTS (SINCE 7-5-22 SUBMITTAL) | | | 19. SECTION A-A | | | A. SHOW SWALE SECTION IN THE LANDSCAPE BED. | | | | | | 20. SECTION B-B | | | A. SHOW SWALE SECTIONS IN THE LANDSCAPE BEDS. | | | | | | 21. SECTION C-C | | | A. LABEL R/W AS S. DIXIE HWY. | | | B. SHOW SHALLOW SWALE BETWEEN PROPERTY LINE AND | | | BUILDING THAT WILL DIRECT SURFACE RUNOFF TO STRUCTURES | | | DS-5 AND DS-6. | | | C. SHOW SWALE SECTION IN THE LANDSCAPE BED TO COLLECT | | | AND STORE STORMWATER RUNOFF. | | | | | | 22. EXFILTRATION TRENCH IS NOT LABELED BETWEEN | | | STRUCTURES DS-5 AND DS-6. EXPLAIN HOW THIS TRENCH WILL | | | BE SURCHARGED. | | | | | | 23. CONFIRM PIPE AND EXFILTRATION TRENCH LENGTHS | | | BETWEEN STRUCTURES DS-01 AND DS-02 AND BETWEEN DS-02 | | | AND DS-03. | | | | | | 24. SHOW WHERE ROOF DRAINS WILL CONNECT TO THE DRAINAGE | | | SYSTEM. | | | | | | 25. THE TWO PAVER AREAS ALONG THE EAST PROPERTY LINE - | | | WHERE/HOW DO THEY DRAIN? THEY CANNOT FLOW TO THE EAST | | | PROPERTY LINE TOWARD THE ADJACENT PROPERTY. | | | | | | THESE CONDITIONS FOR SITE PLAN APPROVAL WERE ADDED | | | 10/4/22 WHEN THE PASSED STATUS WAS MADE: | | | | | | - SHOW THE LANDSCAPE AREA ALONG THE WEST PROPERTY AS | | | HAVING A DEPRESSED AREA FOR STORING STORMWATER RUNOFF | | | TO REDUCE THE AMOUNT OF RUNOFF FLOWING TO THE STREET. | | | [COMMENT #3] | | | | | | - FINISHED FLOOR ELEVATIONS SHALL BE LISTED ON THE | | | CIVIL DRAWINGS. [COMMENT #7] | | | | | | - INCLUDE A DETAIL OF THE EXFILTRATION TRENCH. LABEL | | | THE WIDTH, AND ELEVATIONS OF THE TOP AND BOTTOM OF THE | | | TRENCH. [COMMENT #8] | | | | | | - PROVIDE A DETAIL OF THE CONTROL STRUCTURE. [COMMENT | | | #9] | | | | | | - ADDITIONAL EXISTING DROP CURBS AND TRANSITIONS SHALL | | | BE REPLACED WITH FDOT TYPE F CURB AND GUTTER FOR 3 | | | SECTIONS ON S. DIXIE HIGHWAY AND ONE SECTION ON | | | OKEECHOBEE BLVD. LABEL ALL NEW CURBING ON THE PAVING, | | | GRADING AND DRAINAGE PLANS.[COMMENT #12] | | | | | | - USE DIFFERENT SYMBOLS FOR EXISTING AND PROPOSED SPOT | | | ELEVATIONS AND INCLUDE THE SYMBOLS IN THE SHEET LEGEND. | | | [COMMENT #13] | | | | | | - ON THE TYPICAL CROSS SECTIONS, SHOW SWALE SECTIONS | | | FOR STORING STORMWATER RUNOFF IN THE LANDSCAPE BED | | | AREAS. [COMMENTS #19 AND #20] | | | | | | - LABEL S. DIXIE R/W ON SECTION C-C. SHOW SHALLOW SWALE | | | BETWEEN THE PROPERTY LINE AND BUILDING THAT WILL DIRECT | | | FLOW TO STRUCTURES DS-5 AND DS-6. [COMMENT #21] | | | | | | - LABEL ALL OF THE EXFILTRATION TRENCHES AND THEIR | | | LENGTHS AND ENSURE THE DESIGN INDICATES HOW THE | | | TRENCHES WILL BE SURCHARGED TO FUNCTION. [COMMENTS #22 | | | AND #23] | | | | | | - SHOW WHERE THE ROOF DRAINS WILL BE CONNECTED TO THE | | | ONSITE DRAINAGE SYSTEM. [COMMENT #24] | | | | | | - THE TWO PAVER AREAS ALONG THE EAST PROPERTY LINE | | | CANNOT DRAIN ONTO THE ADJACENT PROPERTY. [COMMENT #25] | | | | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | [email protected] | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
F |
Date |
07-21-2022 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
07-21-2022 |
Time |
16:52 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
07-21-2022 |
Time |
16:54 |
Sent To |
|
|
| Notes |
| 2022-07-21 16:52:42 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 7/5/2022 SUBMITTAL: | | | | | | 1. [SATISFIED] THE CITY'S OFFICIAL VERTICAL DATUM IS | | | NGVD1929. THE CITY HAS ALLOWED THE USE OF NAVD1988 AS | | | LONG AS THE CONVERSION EQUATION TO NGVD1929 AT THE | | | PROJECT LOCATION IS PROVIDED. PROVIDE VERTICAL DATUM | | | REFERENCE AND CONVERSION TO NGVD1929 ON EVERY SHEET | | | WITH ELEVATION INFORMATION. | | | | | | 2. [SATISFIED] PROVIDE TRENCH DRAIN ACROSS SOUTH | | | DRIVEWAY TO INTERCEPT RUNOFF BEFORE CROSSING THE | | | SIDEWALK. | | | | | | 3. [PARTIALLY SATISFIED] PROVIDE A TRENCH DRAIN ALONG | | | THE WEST PROPERTY LINE TO INTERCEPT RUNOFF. ADDITIONAL | | | COMMENTS: LANDSCAPE AREA SHOULD BE GRADED TO STORE | | | RUNOFF (SWALE SECTION). PUBLIC OPEN SPACE AND SIDEWALK | | | SHOULD BE GRADED TO DRAIN TO DS-04 AND DS-05. DS-04 | | | SHOULD BE IN A DEPRESSION TO COLLECT THE RUNOFF FROM | | | THE OPEN SPACE AREA. | | | | | | 4. [SATISFIED] FDOT MAINTAINS THE RIGHT OF WAY FOR | | | OKEECHOBEE BLVD., LAKEVIEW AVE. AND S. DIXIE HWY. | | | | | | 5. [NOT SATISFIED] PROVIDE CROSS SECTIONS FROM | | | CENTERLINE OF RIGHTS OF WAY TO FACE OF BUILDING. SHOW | | | BREAK POINTS, DISTANCES FROM BACK OF CURB TO PROPERTY | | | LINE, FROM PROPERTY LINE TO FACE OF BUILDING, WIDTH OF | | | SIDEWALK, CURB, ETC. LABEL THE RIGHT OF WAY (OKEECHOBEE | | | BLVD, LAKEVIEW AVE, S. DIXIE HWY). ADDITIONAL COMMENTS: | | | THE CROSS SECTIONS WILL SHOW HOW THE SIDEWALK AREAS AND | | | DRIVEWAY APRONS WILL BE GRADED TO MEET A.D.A. CRITERIA. | | | THE CONTOURING ON THE PAVING AND GRADING PLAN APPEAR TO | | | RESULT IN SIDEWALK CROSS SLOPES STEEPER THAN 2%. | | | | | | 6. [PARTIALLY SATISFIED] PROVIDE EXISTING SPOT GRADES | | | ALONG EDGES OF PAVEMENT. ADDITIONAL COMMENT: WHERE DID | | | THE EXISTING SPOT GRADES COME FROM? THEY DO NOT APPEAR | | | ON THE SURVEY. | | | | | | 7. [PARTIALLY SATISFIED] PROVIDE PROPOSED FINISHED | | | FLOOR ELEVATION. ADDITIONAL COMMENT ? PROVIDE THE FFE'S | | | ON THE CIVIL PLANS. | | | | | | 8. [PARTIALLY SATISFIED] PROVIDE A DETAIL FOR THE | | | EXFILTRATION TRENCH. LABEL THE WIDTH AND ELEVATIONS OF | | | THE TOP AND BOTTOM OF THE TRENCH. ADDITIONAL COMMENT: | | | REQUESTED INFORMATION CAN BE PROVIDED WITH THE | | | ENGINEERING PERMIT SUBMITTAL. | | | | | | 9. [NOT SATISFIED] PROVIDE A DETAIL FOR THE CONTROL | | | STRUCTURE. THE CITY DOES NOT ALLOW THE USE OF BLEEDERS | | | WITH EXFILTRATION TRENCH SYSTEMS. ADDITIONAL COMMENT: | | | CONTROL STRUCTURE DETAIL CAN BE PROVIDED WITH THE | | | ENGINEERING PERMIT SUBMITTAL. | | | | | | 10. [PARTIALLY SATISFIED] MINIMUM DIAMETER OF STORM | | | PIPE TO BE INSTALLED IN THE RIGHT OF WAY IS 15 INCH | | | RCP. ADDITIONAL COMMENT: PVC PIPE FROM DS-04 SHOULD BE | | | RCP. | | | | | | NEW COMMENTS: | | | | | | 11. CONTOURING OF SIDEWALK APPEARS TO RESULT IN CROSS | | | SLOPES STEEPER THAN 2%. | | | | | | 12. REPLACE ALL DROP CURB OF EXISTING DRIVEWAYS WITH | | | TYPE F CURB AND GUTTER. | | | | | | 13. INCLUDE IN THE LEGEND OF THE PAVING AND GRADING | | | PLAN THE SPOT GRADE SYMBOLS AND CONTOUR LINE SYMBOL. | | | USE A DIFFERENT SYMBOL FOR EXISTING SPOT GRADES. | | | | | | 14. SHOW AND LABEL THE DRAINAGE CONTROL STRUCTURE. | | | | | | 15. INDICATE HOW WATER QUALITY TREATMENT WILL BE | | | PROVIDED FOR THE RUNOFF FROM THE NORTHWEST CORNER OF | | | THE SITE (DRAINING TO DS-04 AND DS-05. | | | | | | 16. ENSURE THERE IS ADEQUATE VERTICAL CLEARANCE WITHIN | | | THE BUILDING TO BE ABLE TO SERVICE THE EXFILTRATION | | | TRENCHES AND DRAINAGE STRUCTURES AND TO BE ABLE TO | | | REPLACE THE EXFILTRATION TRENCHES WHEN THEY ARE NO | | | LONGER FUNCTIONING AS INTENDED. | | | | | | 17. CONSIDER INCORPORATING LOW IMPACT DEVELOPMENT | | | DRAINAGE SYSTEMS IN LIEU OR IN ADDITION TO THE | | | EXFILTRATION TRENCHES. | | | | | | 18. REFERENCE FDOT STANDARD PLAN NUMBERS INSTEAD OF | | | FDOT STANDARD INDEX NUMBERS. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
06-06-2022 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
06-06-2022 |
Time |
13:07 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
06-06-2022 |
Time |
13:11 |
Sent To |
|
|
| Notes |
| 2022-06-06 13:11:32 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. THE CITY?S OFFICIAL VERTICAL DATUM IS NGVD1929. THE | | | CITY HAS ALLOWED THE USE OF NAVD1988 AS LONG AS THE | | | CONVERSION EQUATION TO NGVD1929 AT THE PROJECT LOCATION | | | IS PROVIDED. PROVIDE VERTICAL DATUM REFERENCE AND | | | CONVERSION TO NGVD1929 ON EVERY SHEET WITH ELEVATION | | | INFORMATION. | | | | | | 2. PROVIDE TRENCH DRAIN ACROSS SOUTH DRIVEWAY TO | | | INTERCEPT RUNOFF BEFORE CROSSING THE SIDEWALK. | | | | | | 3. PROVIDE A TRENCH DRAIN ALONG THE WEST PROPERTY LINE | | | TO INTERCEPT RUNOFF. | | | | | | 4. FDOT MAINTAINS THE RIGHT OF WAY FOR OKEECHOBEE | | | BLVD., LAKEVIEW AVE. AND S. DIXIE HWY. | | | | | | 5. PROVIDE CROSS SECTIONS FROM CENTERLINE OF RIGHTS OF | | | WAY TO FACE OF BUILDING. SHOW BREAK POINTS, DISTANCES | | | FROM BACK OF CURB TO PROPERTY LINE, FROM PROPERTY LINE | | | TO FACE OF BUILDING, WIDTH OF SIDEWALK, CURB, ETC. | | | LABEL THE RIGHT OF WAY (OKEECHOBEE BLVD, LAKEVIEW AVE, | | | S. DIXIE HWY). | | | | | | 6. PROVIDE EXISTING SPOT GRADES ALONG EDGES OF | | | PAVEMENT. | | | | | | 7. PROVIDE PROPOSED FINISHED FLOOR ELEVATION. | | | | | | 8. PROVIDE A DETAIL FOR THE EXFILTRATION TRENCH. LABEL | | | THE WIDTH AND ELEVATIONS OF THE TOP AND BOTTOM OF THE | | | TRENCH. | | | | | | 9. PROVIDE A DETAIL FOR THE CONTROL STRUCTURE. THE CITY | | | DOES NOT ALLOW THE USE OF BLEEDERS WITH EXFILTRATION | | | TRENCH SYSTEMS. | | | | | | 10. MINIMUM DIAMETER OF STORM PIPE TO BE INSTALLED IN | | | THE RIGHT OF WAY IS 15? RCP. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP | | | CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH | | | THE ENGINEERING PERMIT SUBMITTAL. | | | | | | 2. PROVIDE COPY OF SFWMD ERP PERMIT MODIFICATION BEFORE | | | START OF CONSTRUCTION. | | | | | | 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE | | | ENGINEERING PERMIT SUBMITTAL. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
P |
Date |
10-03-2022 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
10-03-2022 |
Time |
11:55 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-10-03 11:57:00 | CONDITIONS OF APPROVAL: | | | | | | 1. MMOA WITH FDOT AND MAINTENANCE AGREEMENT WITH CITY | | | PRIOR TO C.O. | | | 2. REPLAT PRIOR TO C.O. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
06-01-2022 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
06-01-2022 |
Time |
09:40 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-06-01 09:50:42 | 1. REPLAT WILL BE REQUIRED. | | | 2. FDOT PERMITS REQUIRED FOR DRIVEWAY CONNECTIONS. | | | 3. MMOA WITH FDOT AND DEVELOPER'S AGREEMENT WILL BE | | | REQUIRED FOR MAINTENANCE OF PROPOSED RIGHT-OF-WAY | | | IMPROVEMENTS. | | | 4. WATER SYSTEM WILL NEED TO BE RE-ENGINEERED. CITY | | | WILL NOT ACCEPT WATER MAIN UNDER BUILDING. SUGGEST | | | MASTER METER AT RIGHT-OF-WAY LINE. | | | 5. SANITARY SYSTEM WILL BE PRIVATE. ADD MANHOLE AT | | | RIGHT-OF-WAY OF OKEECHOBEE AS THE POINT OF SERVICE. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
4 |
Status |
P |
Date |
10-18-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
10-18-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
10-18-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-10-18 13:10:39 | APPROVED WITH THE FOLLOWING CONDITIONS: | | | 1) PROVIDE UPDATED TRAFFIC AND VALET ANALYSES PER THE | | | NORTHERN DRIVEWAY CHANGE IN DIRECTIONALITY | | | 2) CORRECT ROADWAY PAVEMENT MARKINGS IN THE | | | TRANSPORTATION SITE PLAN | | | 3) RE-ALIGN THE NORTHERN AND EASTERN PEDESTRIAN | | | CROSSWALKS TO BE PERPENDICULAR TO THE CROSSING ROAD AT | | | THE OKEECHOBEE AND DIXIE INTERSECTION | | | 4) PROVIDE THE UPDATED FDOT D4 LETTER WITH RESPECT TO | | | THE CHANGE IN THE NORTHERN DRIVEWAY DIRECTIONALITY AND | | | THE MINIMUM DISTANCE BETWEEN THE SOUTHERN DRIVEWAY AND | | | DIXIE | | | 5) DISCUSS AND REFINE TDM MEASURES | | | | | | PAST COMMENTS | | | 1) SATISFIED. GIVEN THE SENSITIVE LOCATION OF THE | | | PROPOSED DEVELOPMENT, A METHODOLOGY MEETING SHALL BE | | | SCHEDULED FOR A COMPREHENSIVE TRAFFIC STUDY | | | 2) PARTIALLY SATISFIED. PROVIDE A THOROUGH VALET | | | SERVICE/QUEUE ANALYSIS. SHEET A1.02 SHOWS A THIRD VALET | | | LOCATION, WHICH IS NOT MENTIONED IN THE ANALYSIS. | | | MOREOVER, VALET SPACES MUST BE IDENTIFIED IN THE SITE | | | PLANS, ANALYSIS MUST INCLUDE MATHEMATICAL ANALYSIS, | | | PROCESS TIME MUST BE CALCULATED AND PROPERLY BROKEN | | | DOWN (I.E. ACCEPTANCE/DELIVERY PROCESSING TIME AT VALET | | | STAND, DRIVE UP/DOWN TIME, WALK UP/DOWN TIME). FULL | | | PATH FROM STAND TO PARKING STALLS MUST BE SHOWN, NOT | | | JUST GROUND OPERATIONS | | | 3) SATISFIED. PROVIDE COUNTY TPS LETTER, ONCE RECEIVED | | | 4) SATISFIED. PROVIDE FDOT D4 ACCESS MANAGEMENT LETTER, | | | ONCE RECEIVED | | | 5) PARTIALLY SATISFIED. ON THE SITE PLAN, PLEASE | | | SHOWCASE BASIC CURB DETAILS (I.E. DRIVEWAY AND PARKING | | | STALLS) ON THE OPPOSITE SIDE OF THE ROADS SURROUNDING | | | THE PROPOSED DEVELOPMENT. PLEASE PROVIDE DOCUMENT NAME | | | AND SHEET NUMBER SHOWCASING SUCH FEATURES. REQUEST IS | | | FOR A CLEAN SITE PLAN, SHOWCASING AND HIGHLIGHTING | | | TRANSPORTATION ELEMENTS (E.G. NO UNDERGROUND UTILITY | | | DETAILS, ONLY SURFACE ITEMS SUCH AS POLES AND BASINS). | | | ALSO, NONE OF THE CIVIL OR ARCHITECTURAL PLANS ARE | | | SHOWCASING PAVEMENTS MARKINGS AND LANE WIDTHS OF THE | | | SURROUNDING ROADWAY NETWORK. PLEASE PROVIDE A DEDICATED | | | AND DETAILED TRANSPORTATION-ORIENTED SITE PLAN. SEVERAL | | | SIDEWALKS, LANES, | | | 6) SATISFIED. SHEET C-102, RIGHT DRAWING. WB-40 | | | MANEUVERING SHOWS ENCROACHMENT WITH THE INTERNAL | | | SIDEWALK BY THE DROP-OFF AREA. IS THAT PORTION OF THE | | | WALKWAY CURB LESS? | | | 7) SATISFIED. SHEET A1.04 TO 06, PROVIDE AND CLEARLY | | | MARK TURNAROUND SPACE AT THE SOUTHERN DEAD-END | | | 8) SATISFIED. SHEET A1.07, PROVIDE AND CLEARLY MARK | | | TURNAROUND SPACE AT THE SOUTHERN AND NORTHERN DEAD-ENDS | | | 9) SATISFIED. IDENTIFY AND DESIGNATE AN EASILY | | | ACCESSIBLE MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20 | | | FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS. FOR | | | THE LATTER ITEM, MORE SPECIFICALLY: A CONDUIT (2??? | | | SCHEDULE 40 PVC) TO THE POWER SOURCE WITH AN ELECTRICAL | | | PULL BOX (240V ??? 10,000W CIRCUIT). PLEASE PROVIDE | | | DOCUMENT NAME AND SHEET NUMBER SHOWCASING SUCH FEATURE. | | | 10) SATISFIED. PROVIDE NUMBER AND LOCATION OF BICYCLE | | | PARKING | | | 11) SATISFIED. A MINIMUM OF 2 ADA VAN ACCESSIBLE | | | PARKING SPACES MUST BE PROVIDED, PLEASE INDICATE THOSE | | | STALLS | | | 12) SATISFIED. PROVIDE 10 FEET WIDE SIDEWALKS AROUND | | | THE PROPOSED DEVELOPMENT. THIS ITEM WILL BE REVIEWED | | | AND CLEARED ONCE A TRANSPORTATION SPECIFIC SITE PLAN IS | | | PROVIDED. CODE REQUIRES A MINIMUM OF 8 FEET, BUT | | | CONSIDERING THE LOCATION OF THE PROPOSED DEVELOPMENT | | | AND THE POTENTIAL FOR HIGH PEDESTRIAN TRAFFIC, WIDER | | | SIDEWALKS ARE RECOMMENDED. | | | 13) SATISFIED. REMOVE/RELOCATE THE LANDSCAPE ISLAND | | | INSTALLED IN THE MIDDLE OF THE SIDEWALK ALONG DIXIE AND | | | OKEECHOBEE OR PROVIDE A JUSTIFICATION. SUCH FEATURES | | | ARE SIGNIFICANTLY SPLITTING AND REDUCING THE WALKABLE | | | AREA | | | 14) SATISFIED. REMOVE THE PARALLEL PARKING STALLS ON | | | DIXIE | | | 15) PARTIALLY SATISFIED. MAKE THE NORTHERN DRIVEWAY ON | | | LAKEVIEW AVE EXIT ONLY. PROVIDE A TRAFFIC ANALYSIS | | | QUANTIFYING THE INCREASE IN TRAFFIC, IF ANY. DRIVEWAY | | | CONFIGURATION OF NEARBY BUILDINGS IS NOT A SUFFICIENT | | | JUSTIFICATION. PER THE FDOT DOCUMENT: ???THIS LETTER | | | DOES NOT GUARANTEE PERMIT APPROVAL. THE PERMIT MAY BE | | | DENIED BASED ON THE REVIEW OF THE SUBMITTED ENGINEERING | | | PLANS???. CONSIDERING THE VICINITY OF THE GARAGE RAMP | | | AND THE HOTEL VALET OPERATION TO THE NORTHERN DRIVEWAY, | | | THERE ARE A SIGNIFICANT NUMBER OF CONFLICT POINTS | | | NEGATIVELY AFFECTING THE INTERNAL CIRCULATION, WITH A | | | SIGNIFICANT INCREASE OF POTENTIAL SPILLBACKS INTO | | | OKEECHOBEE BLVD. THE ONE-WAY EXIT ONLY IS STRONGLY | | | RECOMMENDED | | | 16) SATISFIED CONSIDER MAKING THE SOUTHERN DRIVEWAY ON | | | OKEECHOBEE BLVD ENTRY ONLY. PROVIDE A TRAFFIC. ANALYSIS | | | QUANTIFYING THE INCREASE IN TRAFFIC. PROVIDE A TRAFFIC | | | ANALYSIS QUANTIFYING THE INCREASE IN TRAFFIC, IF ANY. | | | DRIVEWAY CONFIGURATION OF NEARBY BUILDINGS IS NOT A | | | SUFFICIENT JUSTIFICATION. PER THE FDOT DOCUMENT: | | | ???THIS LETTER DOES NOT GUARANTEE PERMIT APPROVAL. THE | | | PERMIT MAY BE DENIED BASED ON THE REVIEW OF THE | | | SUBMITTED ENGINEERING PLANS???. IF THE NORTHERN | | | DRIVEWAY WERE TO BE CONFIGURED AS EXIT ONLY, THE | | | SOUTHERN ONE COULD BE FULL ACCESS | | | 17) SATISFIED. HAS THE WESTBOUND LEFT-TURN STORAGE LANE | | | ON LAKEVIEW AVE BEEN SHORTENED BECAUSE OF THE PROPOSED | | | NORTHERN DRIVEWAY LOCATION? PLEASE PROVIDE DETAILED | | | MEASUREMENTS OF THE STORAGE LANE ON THE SITE PLAN | | | 18) PARTIALLY SATISFIED. THE FDOT LETTER AUTHORIZED THE | | | INSTALLATION OF BOTH THE NORTHERN AND SOUTHERN | | | DRIVEWAYS APPROXIMATELY 150 FEET FROM DIXIE AND 330 | | | FEET FROM OLIVE. PLEASE SHOWCASE SUCH DISTANCES ON THE | | | SITE PLAN. | | | 19) SATISFIED. SHOWCASE ALL THE DISTANCES AND FEATURES | | | MENTIONED OR REQUESTED IN THE FDOT LETTER | | | 20) SATISFIED. PEDESTRIAN RAMPS ARE MISSING | | | 21) SATISFIED. SIDEWALK WIDTHS ARE MISSING ON SEVERAL | | | LOCATIONS | | | 22) SATISFIED. INTERNAL DRIVEWAYS, LANES AND WALKWAYS | | | MUST BE DIMENSIONED | | | 23) SATISFIED. SHOWCASE AND DIMENSION THE REQUIRED | | | VISIBILITY TRIANGLES | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | | | | | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
3 |
Status |
F |
Date |
08-22-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
08-22-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
08-22-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-08-22 20:54:19 | TRAFFIC COMMENTS | | | 1) SATISFIED. GIVEN THE SENSITIVE LOCATION OF THE | | | PROPOSED DEVELOPMENT, A METHODOLOGY MEETING SHALL BE | | | SCHEDULED FOR A COMPREHENSIVE TRAFFIC STUDY | | | 2) PARTIALLY SATISFIED. PROVIDE A THOROUGH VALET | | | SERVICE/QUEUE ANALYSIS. SHEET A1.02 SHOWS A THIRD VALET | | | LOCATION, WHICH IS NOT MENTIONED IN THE ANALYSIS. | | | MOREOVER, VALET SPACES MUST BE IDENTIFIED IN THE SITE | | | PLANS, ANALYSIS MUST INCLUDE MATHEMATICAL ANALYSIS, | | | PROCESS TIME MUST BE CALCULATED AND PROPERLY BROKEN | | | DOWN (I.E. ACCEPTANCE/DELIVERY PROCESSING TIME AT VALET | | | STAND, DRIVE UP/DOWN TIME, WALK UP/DOWN TIME). FULL | | | PATH FROM STAND TO PARKING STALLS MUST BE SHOWN, NOT | | | JUST GROUND OPERATIONS | | | 3) SATISFIED. PROVIDE COUNTY TPS LETTER, ONCE RECEIVED | | | 4) SATISFIED. PROVIDE FDOT D4 ACCESS MANAGEMENT LETTER, | | | ONCE RECEIVED | | | | | | SITE COMMENTS | | | 5) NOT SATISFIED. ON THE SITE PLAN, PLEASE SHOWCASE | | | BASIC CURB DETAILS (I.E. DRIVEWAY AND PARKING STALLS) | | | ON THE OPPOSITE SIDE OF THE ROADS SURROUNDING THE | | | PROPOSED DEVELOPMENT. PLEASE PROVIDE DOCUMENT NAME AND | | | SHEET NUMBER SHOWCASING SUCH FEATURES. REQUEST IS FOR A | | | CLEAN SITE PLAN, SHOWCASING AND HIGHLIGHTING | | | TRANSPORTATION ELEMENTS (E.G. NO UNDERGROUND UTILITY | | | DETAILS, ONLY SURFACE ITEMS SUCH AS POLES AND BASINS). | | | ALSO, NONE OF THE CIVIL OR ARCHITECTURAL PLANS ARE | | | SHOWCASING PAVEMENTS MARKINGS AND LANE WIDTHS OF THE | | | SURROUNDING ROADWAY NETWORK. PLEASE PROVIDE A DEDICATED | | | AND DETAILED TRANSPORTATION-ORIENTED SITE PLAN. SEVERAL | | | SIDEWALKS, LANES, | | | 6) SATISFIED. SHEET C-102, RIGHT DRAWING. WB-40 | | | MANEUVERING SHOWS ENCROACHMENT WITH THE INTERNAL | | | SIDEWALK BY THE DROP-OFF AREA. IS THAT PORTION OF THE | | | WALKWAY CURB LESS? | | | 7) SATISFIED. SHEET A1.04 TO 06, PROVIDE AND CLEARLY | | | MARK TURNAROUND SPACE AT THE SOUTHERN DEAD-END | | | 8) SATISFIED. SHEET A1.07, PROVIDE AND CLEARLY MARK | | | TURNAROUND SPACE AT THE SOUTHERN AND NORTHERN DEAD-ENDS | | | 9) SATISFIED. IDENTIFY AND DESIGNATE AN EASILY | | | ACCESSIBLE MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20 | | | FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS. FOR | | | THE LATTER ITEM, MORE SPECIFICALLY: A CONDUIT (2? | | | SCHEDULE 40 PVC) TO THE POWER SOURCE WITH AN ELECTRICAL | | | PULL BOX (240V ? 10,000W CIRCUIT). PLEASE PROVIDE | | | DOCUMENT NAME AND SHEET NUMBER SHOWCASING SUCH FEATURE. | | | 10) SATISFIED. PROVIDE NUMBER AND LOCATION OF BICYCLE | | | PARKING | | | 11) SATISFIED. A MINIMUM OF 2 ADA VAN ACCESSIBLE | | | PARKING SPACES MUST BE PROVIDED, PLEASE INDICATE THOSE | | | STALLS | | | 12) NOT SATISFIED. PROVIDE 10 FEET WIDE SIDEWALKS | | | AROUND THE PROPOSED DEVELOPMENT. THIS ITEM WILL BE | | | REVIEWED AND CLEARED ONCE A TRANSPORTATION SPECIFIC | | | SITE PLAN IS PROVIDED. CODE REQUIRES A MINIMUM OF 8 | | | FEET, BUT CONSIDERING THE LOCATION OF THE PROPOSED | | | DEVELOPMENT AND THE POTENTIAL FOR HIGH PEDESTRIAN | | | TRAFFIC, WIDER SIDEWALKS ARE RECOMMENDED. | | | 13) REMOVE/RELOCATE THE LANDSCAPE ISLAND INSTALLED IN | | | THE MIDDLE OF THE SIDEWALK ALONG DIXIE AND OKEECHOBEE | | | OR PROVIDE A JUSTIFICATION. SUCH FEATURES ARE | | | SIGNIFICANTLY SPLITTING AND REDUCING THE WALKABLE AREA | | | 14) SATISFIED. REMOVE THE PARALLEL PARKING STALLS ON | | | DIXIE | | | 15) PARTIALLY SATISFIED. MAKE THE NORTHERN DRIVEWAY ON | | | LAKEVIEW AVE EXIT ONLY. PROVIDE A TRAFFIC ANALYSIS | | | QUANTIFYING THE INCREASE IN TRAFFIC, IF ANY. DRIVEWAY | | | CONFIGURATION OF NEARBY BUILDINGS IS NOT A SUFFICIENT | | | JUSTIFICATION. PER THE FDOT DOCUMENT: ?THIS LETTER DOES | | | NOT GUARANTEE PERMIT APPROVAL. THE PERMIT MAY BE DENIED | | | BASED ON THE REVIEW OF THE SUBMITTED ENGINEERING | | | PLANS?. CONSIDERING THE VICINITY OF THE GARAGE RAMP AND | | | THE HOTEL VALET OPERATION TO THE NORTHERN DRIVEWAY, | | | THERE ARE A SIGNIFICANT NUMBER OF CONFLICT POINTS | | | NEGATIVELY AFFECTING THE INTERNAL CIRCULATION, WITH A | | | SIGNIFICANT INCREASE OF POTENTIAL SPILLBACKS INTO | | | OKEECHOBEE BLVD. THE ONE-WAY EXIT ONLY IS STRONGLY | | | RECOMMENDED | | | 16) PARTIALLY SATISFIED CONSIDER MAKING THE SOUTHERN | | | DRIVEWAY ON OKEECHOBEE BLVD ENTRY ONLY. PROVIDE A | | | TRAFFIC. ANALYSIS QUANTIFYING THE INCREASE IN TRAFFIC. | | | PROVIDE A TRAFFIC ANALYSIS QUANTIFYING THE INCREASE IN | | | TRAFFIC, IF ANY. DRIVEWAY CONFIGURATION OF NEARBY | | | BUILDINGS IS NOT A SUFFICIENT JUSTIFICATION. PER THE | | | FDOT DOCUMENT: ?THIS LETTER DOES NOT GUARANTEE PERMIT | | | APPROVAL. THE PERMIT MAY BE DENIED BASED ON THE REVIEW | | | OF THE SUBMITTED ENGINEERING PLANS?. IF THE NORTHERN | | | DRIVEWAY WERE TO BE CONFIGURED AS EXIT ONLY, THE | | | SOUTHERN ONE COULD BE FULL ACCESS | | | 17) HAS THE WESTBOUND LEFT-TURN STORAGE LANE ON | | | LAKEVIEW AVE BEEN SHORTENED BECAUSE OF THE PROPOSED | | | NORTHERN DRIVEWAY LOCATION? PLEASE PROVIDE DETAILED | | | MEASUREMENTS OF THE STORAGE LANE ON THE SITE PLAN | | | 18) THE FDOT LETTER AUTHORIZED THE INSTALLATION OF BOTH | | | THE NORTHERN AND SOUTHERN DRIVEWAYS APPROXIMATELY 150 | | | FEET FROM DIXIE AND 330 FEET FROM OLIVE. PLEASE | | | SHOWCASE SUCH DISTANCES ON THE SITE PLAN | | | 19) SHOWCASE ALL THE DISTANCES AND FEATURES MENTIONED | | | OR REQUESTED IN THE FDOT LETTER | | | 20) PEDESTRIAN RAMPS ARE MISSING | | | 21) SIDEWALK WIDTHS ARE MISSING ON SEVERAL LOCATIONS | | | 22) INTERNAL DRIVEWAYS, LANES AND WALKWAYS MUST BE | | | DIMENSIONED | | | 23) SHOWCASE AND DIMENSION THE REQUIRED VISIBILITY | | | TRIANGLES | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | | | | | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
2 |
Status |
F |
Date |
07-28-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
07-28-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-07-28 08:42:09 | TRAFFIC COMMENTS | | | 1) SATISFIED. GIVEN THE SENSITIVE LOCATION OF THE | | | PROPOSED DEVELOPMENT, A METHODOLOGY MEETING SHALL BE | | | SCHEDULED FOR A COMPREHENSIVE TRAFFIC STUDY | | | 2) SATISFIED. PROVIDE A THOROUGH VALET SERVICE/QUEUE | | | ANALYSIS | | | 3) PARTIALLY SATISFIED. PROVIDE COUNTY TPS LETTER, ONCE | | | RECEIVED | | | 4) PARTIALLY SATISFIED. PROVIDE FDOT D4 ACCESS | | | MANAGEMENT LETTER, ONCE RECEIVED | | | | | | SITE COMMENTS | | | 5) NOT SATISFIED. ON THE SITE PLAN, PLEASE SHOWCASE | | | BASIC CURB DETAILS (I.E. DRIVEWAY AND PARKING STALLS) | | | ON THE OPPOSITE SIDE OF THE ROADS SURROUNDING THE | | | PROPOSED DEVELOPMENT. PLEASE PROVIDE DOCUMENT NAME AND | | | SHEET NUMBER SHOWCASING SUCH FEATURES. REQUEST IS FOR A | | | CLEAN SITE PLAN, SHOWCASING AND HIGHLIGHTING | | | TRANSPORTATION ELEMENTS (E.G. NO UNDERGROUND UTILITY | | | DETAILS, ONLY SURFACE ITEMS SUCH AS POLES AND BASINS). | | | ALSO, NONE OF THE CIVIL OR ARCHITECTURAL PLANS ARE | | | SHOWCASING PAVEMENTS MARKINGS AND LANE WIDTHS OF THE | | | SURROUNDING ROADWAY NETWORK. PLEASE PROVIDE A DEDICATED | | | AND DETAILED TRANSPORTATION-ORIENTED SITE PLAN. | | | 6) SATISFIED. SHEET C-102, RIGHT DRAWING. WB-40 | | | MANEUVERING SHOWS ENCROACHMENT WITH THE INTERNAL | | | SIDEWALK BY THE DROP-OFF AREA. IS THAT PORTION OF THE | | | WALKWAY CURB LESS? | | | 7) SATISFIED. SHEET A1.04 TO 06, PROVIDE AND CLEARLY | | | MARK TURNAROUND SPACE AT THE SOUTHERN DEAD-END | | | 8) SATISFIED. SHEET A1.07, PROVIDE AND CLEARLY MARK | | | TURNAROUND SPACE AT THE SOUTHERN AND NORTHERN DEAD-ENDS | | | 9) SATISFIED. IDENTIFY AND DESIGNATE AN EASILY | | | ACCESSIBLE MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20 | | | FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS. FOR | | | THE LATTER ITEM, MORE SPECIFICALLY: A CONDUIT (2? | | | SCHEDULE 40 PVC) TO THE POWER SOURCE WITH AN ELECTRICAL | | | PULL BOX (240V 10,000W CIRCUIT). PLEASE PROVIDE | | | DOCUMENT NAME AND SHEET NUMBER SHOWCASING SUCH FEATURE. | | | 10) SATISFIED. PROVIDE NUMBER AND LOCATION OF BICYCLE | | | PARKING | | | 11) SATISFIED. A MINIMUM OF 2 ADA VAN ACCESSIBLE | | | PARKING SPACES MUST BE PROVIDED, PLEASE INDICATE THOSE | | | STALLS | | | 12) NOT SATISFIED. PROVIDE 10 FEET WIDE SIDEWALKS | | | AROUND THE PROPOSED DEVELOPMENT. THIS ITEM WILL BE | | | REVIEWED AND CLEARED ONCE A TRANSPORTATION SPECIFIC | | | SITE PLAN IS PROVIDED. | | | 13) SATISFIED. REMOVE THE PARALLEL PARKING STALLS ON | | | DIXIE | | | 14) PARTIALLY SATISFIED. MAKE THE NORTHERN DRIVEWAY ON | | | LAKEVIEW AVE EXIT ONLY. PROVIDE A TRAFFIC ANALYSIS | | | QUANTIFYING THE INCREASE IN TRAFFIC, IF ANY. DRIVEWAY | | | CONFIGURATION OF NEARBY BUILDINGS IS NOT A SUFFICIENT | | | JUSTIFICATION. | | | 15) PARTIALLY SATISFIED CONSIDER MAKING THE SOUTHERN | | | DRIVEWAY ON OKEECHOBEE BLVD ENTRY ONLY. PROVIDE A | | | TRAFFIC. ANALYSIS QUANTIFYING THE INCREASE IN TRAFFIC. | | | PROVIDE A TRAFFIC ANALYSIS QUANTIFYING THE INCREASE IN | | | TRAFFIC, IF ANY. DRIVEWAY CONFIGURATION OF NEARBY | | | BUILDINGS IS NOT A SUFFICIENT JUSTIFICATION. | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
06-08-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
06-08-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
06-08-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-06-08 21:22:53 | TRAFFIC COMMENTS | | | 1) GIVEN THE SENSITIVE LOCATION OF THE PROPOSED | | | DEVELOPMENT, A METHODOLOGY MEETING SHALL BE SCHEDULED | | | FOR A COMPREHENSIVE TRAFFIC STUDY | | | 2) PROVIDE A THOROUGH VALET SERVICE/QUEUE ANALYSIS | | | 3) PROVIDE COUNTY TPS LETTER | | | 4) PROVIDE FDOT D4 ACCESS MANAGEMENT LETTER | | | | | | SITE COMMENTS | | | 5) ON THE SITE PLAN, PLEASE SHOWCASE BASIC CURB DETAILS | | | (I.E. DRIVEWAY AND PARKING STALLS) ON THE OPPOSITE SIDE | | | OF THE ROADS SURROUNDING THE PROPOSED DEVELOPMENT. | | | PLEASE PROVIDE DOCUMENT NAME AND SHEET NUMBER | | | SHOWCASING SUCH FEATURES. | | | 6) SHEET C-102, RIGHT DRAWING. WB-40 MANEUVERING SHOWS | | | ENCROACHMENT WITH THE INTERNAL SIDEWALK BY THE DROP-OFF | | | AREA. IS THAT PORTION OF THE WALKWAY CURB LESS? | | | 7) SHEET A1.04 TO 06, PROVIDE AND CLEARLY MARK | | | TURNAROUND SPACE AT THE SOUTHERN DEAD-END | | | 8) SHEET A1.07, PROVIDE AND CLEARLY MARK TURNAROUND | | | SPACE AT THE SOUTHERN AND NORTHERN DEAD-ENDS | | | 9) IDENTIFY AND DESIGNATE AN EASILY ACCESSIBLE | | | MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20 FEET) AND | | | PROVIDE BASIC ELECTRIFICATION READINESS. FOR THE LATTER | | | ITEM, MORE SPECIFICALLY: A CONDUIT (2? SCHEDULE 40 PVC) | | | TO THE POWER SOURCE WITH AN ELECTRICAL PULL BOX (240V ? | | | 10,000W CIRCUIT). PLEASE PROVIDE DOCUMENT NAME AND | | | SHEET NUMBER SHOWCASING SUCH FEATURE. | | | 10) PROVIDE NUMBER AND LOCATION OF BICYCLE PARKING | | | 11) A MINIMUM OF 2 ADA VAN ACCESSIBLE PARKING SPACES | | | MUST BE PROVIDED, PLEASE INDICATE THOSE STALLS | | | 12) PROVIDE 10 FEET WIDE SIDEWALKS AROUND THE PROPOSED | | | DEVELOPMENT | | | 13) REMOVE THE PARALLEL PARKING STALLS ON DIXIE | | | 14) MAKE THE NORTHERN DRIVEWAY ON LAKEVIEW AVE EXIT | | | ONLY | | | 15) CONSIDER MAKING THE SOUTHERN DRIVEWAY ON OKEECHOBEE | | | BLVD ENTRY ONLY | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
P |
Date |
09-30-2022 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
09-30-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
09-30-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-09-30 10:57:40 | *** THE FOLLOWING COMMENTS APPLY TO THE 9/23/2022 | | | RESUBMITTAL PACKET. ZONING HAS APPROVED ITS REVIEW WITH | | | THE FOLLOWING CONDITION THAT THE MINOR CORRECTIONS | | | BELOW ARE ADDRESSED PRIOR TO DAC (STAFF TO WORK WITH | | | THE ARCHITECT/LANDSCAPE ARCHITECTS TO ADDRESS | | | CORRECTIONS FOR CONSISTENCY) *** | | | | | | | | | ARCHITECTURAL PLAN SET: | | | | | | 1.) SHEET A0.01 - CORRECTIONS: A) PROVIDED CONDITIONAL | | | SETBACK ON LEVELS 6-7: 33 FT. VS. 37'-4" (PROVIDED IN | | | THE BUILDING SETBACK PAGE); B) OKEECHOBEE BLVD. | | | TRANSPARENCY REQUIREMENT IS 66' (AT 50%) NOT 60'-10.5"; | | | C) VERIFY PUBLIC OPEN SPACE CALCULATION AT 1,964 SQ. | | | FT. (DIFFERENT IN LANDSCAPE PLAN); D) PROVIDE PRIVATE | | | OPEN SPACE CALCULATIONS. | | | | | | 2.) SHEET A0.07 - CORRECTIONS: SHADING TO INCLUDE WHAT | | | APPEARS TO BE A RESTROOM ON THE GROUND LEVEL FAR GROSS | | | AREA CALCULATIONS; ENSURE CALCULATIONS ARE CORRECT ON | | | ALL APPLICABLE SHEETS - PER 9/28 EMAIL FROM SANGHO - | | | SQUARE FOOTAGE IS NOW 18,170 SQ. FT. (+340 SQ. FT.) | | | | | | 3.) SHEET A1.03 - CORRECTIONS: CORRECTIONS NEED TO BE | | | MADE TO THE PARKING GARAGE PLAN FOR CONSISTENCY. | | | | | | 4.) SHEET A1.04 - CORRECTIONS: 46 PARKING SPACES | | | PROVIDED - I COUNTED 41 STALLS (NOT 40) + 2 TANDEM + 3 | | | ADA (NOT 2). | | | | | | | | | | | | LANDSCAPE PLAN SET: | | | | | | 1.) PUBLIC OPEN SPACE CALCULATIONS DO NOT MATCH | | | ARCHITECTURAL SET (1,964 SQ. FT. VS. 1,940 SQ. FT. ON | | | SHEET LP-4). | | | | | | 2.) SHEET L-1 (ILLUSTRATED OVERALL SITE PLAN) DOES NOT | | | MATCH THE DETAILS PROVIDED IN THE ARCHITECTURAL SET. | | | | | | 3.) ONE CITY PLAZA BUILDING HEIGHT AND AMENITIES DECK | | | (IN STORIES) IS INCONSISTENT WITH THE ARCHITECTURAL SET | | | ON SHEETS: L-2, L-3 AND L-4. | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
08-23-2022 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
08-23-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
08-23-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-08-23 08:45:41 | GENERAL COMMENTS: | | | | | | 1.) IT IS RECOMMENDED THAT THE APPLICANT HOLD OUTREACH | | | MEETINGS WITH THE RESIDENTS OF ONE CITY PLAZA | | | CONDOMINIUM, AS THE PROPOSED PROJECT WILL HAVE A DIRECT | | | IMPACT ON THE ADJACENT RESIDENTIAL CONDO BUILDING. | | | | | | [STAFF RESPONSE: REPEAT COMMENT - IN PROGRESS. | | | ACCORDING TO THE APPLICANT?S PPRC RESPONSE LETTER | | | (8/12/22), THE APPLICANT IS AWARE THAT IT IS NECESSARY | | | TO ENGAGE WITH THE NEIGHBOR PRIOR TO THE PROJECT | | | PROCEEDING TO A DAC MEETING. THIS IS STILL IN PROGRESS. | | | ONCE THE MEETING(S) HAVE BEEN HELD, THE APPLICANT WILL | | | BE REQUIRED TO PROVIDE DOCUMENTATION/NECESSARY | | | CORRESPONDENCE REGARDING THE MEETING(S).] | | | | | | | | | 2.) ALTHOUGH THE PROJECT IS WITHIN THE TRAFFIC | | | CONCURRENCY EXCEPTION AREA (TCEA), A LETTER FROM THE | | | PALM BEACH COUNTY TRAFFIC DIVISION IS STILL REQUIRED. | | | PLEASE CONTACT THE PALM BEACH COUNTY TRAFFIC DIVISION | | | AT (561) 684-4030 FOR INFORMATION ON HOW TO OBTAIN THE | | | REQUIRED TRAFFIC LETTER. | | | | | | [STAFF RESPONSE: REPEAT COMMENT - IN PROGRESS. | | | ACCORDING TO THE APPLICANT?S PPRC RESPONSE LETTER | | | (8/12/22), THE APPLICANT ACKNOWLEDGES THE COMMENT AND | | | HAS NOTED THAT THE TPS ANALYSIS IS CURRENTLY UNDER | | | REVIEW AT PALM BEACH COUNTY. THIS LETTER IS REQUIRED | | | PRIOR TO THE PROJECT PROCEEDING TO A DAC MEETING.] | | | | | | | | | 3.) A PREDETERMINATION LETTER FROM THE FLORIDA | | | DEPARTMENT OF TRANSPORTATION (FDOT) SHALL BE REQUIRED | | | FOR THE PROPOSED ACCESS POINTS AND/OR STREETSCAPE | | | IMPROVEMENTS ALONG SOUTH DIXIE HWY, LAKEVIEW AVENUE AND | | | OKEECHOBEE BOULEVARD (FDOT CONTROLLED ROWS). THIS | | | PREDETERMINATION LETTER IS REQUIRED PRIOR TO THE | | | SCHEDULING OF THIS APPLICATION FOR THE DOWNTOWN ACTION | | | COMMITTEE (DAC) TO ENSURE THE ACCESS POINTS AND | | | STREETSCAPE REQUIREMENTS ARE FEASIBLE. | | | | | | [STAFF RESPONSE: THANK YOU FOR PROVIDING THE FDOT | | | PREDETERMINATION LETTER; HOWEVER, THE LETTER FROM FDOT, | | | DATED 8/4/2022, HAS INCORRECT INFORMATION ON THE UNIT | | | COUNT AND COMMERCIAL BUILDING SQUARE FOOTAGES FOR THE | | | PROJECT. THIS MUST BE CORRECTED FOR CONSISTENCY. PLEASE | | | CONTACT FDOT TO REVISE LETTER WITH THE CORRECT | | | BUILDING/UNIT CALCULATIONS. THE LETTER FROM FDOT IS | | | REQUIRED PRIOR TO THE PROJECT PROCEEDING TO A DAC | | | MEETING.] | | | | | | | | | 4.) PROVIDE A LETTER ENSURING FAA COMPLIANCE (A | | | DETERMINATION OF NO HAZARD) IN REGARD TO THE HEIGHT OF | | | ANY TOWERS OR STRUCTURES WITHIN THE DESIGNATED FLIGHT | | | PATHS. | | | | | | [STAFF RESPONSE: IT WAS BROUGHT TO STAFF'S ATTENTION | | | THAT THE APPLICANT SHOULD OBTAIN THE FAA COMPLIANCE | | | LETTER. AN EMAIL TO THE APPLICANT WENT OUT ON 8/11/2022 | | | TO INFORM THE APPLICANT OF THE LETTER REQUIREMENT. | | | APPLICANT IS AWARE THE PROCESS TO OBTAIN THE COMPLIANCE | | | LETTER IS REQUIRED. PLEASE START PROCESS AND/OR | | | FOLLOW-UP WITH FAA ASAP.] | | | | | | | | | 5.) PLEASE ENSURE ALL PLAN SHEETS MATCH FOR CONSISTENCY | | | (I.E. SITE PLAN, LANDSCAPE PLAN, CIVIL PLANS, ETC.) | | | | | | [STAFF RESPONSE: NOT FULLY ADDRESSED. THERE ARE STILL | | | INCONSISTENCIES IN THE PLAN SET. ANY CHANGES MADE TO | | | THE PLANS REQUIRES ALL PLAN SHEETS TO BE UPDATED FOR | | | CONSISTENCY. PLANNING STAFF WILL WORK WITH THE | | | ARCHITECT AND LANDSCAPE ARCHITECT TO IDENTIFY/ADDRESS | | | THESE INCONSISTENCIES.] | | | | | | | | | 6.) AS DISCUSSED WITH THE ARCHITECT ON 7/19/2022, THE | | | PROJECT CALCULATIONS WILL NEED TO BE REVISED/CORRECTED | | | THROUGHOUT THE PLAN SHEETS FOR ACCURACY. THE ARCHITECT | | | ACKNOWLEDGES THESE INCONSISTENCIES WITH THE PROJECT | | | NUMBERS AND WILL ADDRESS (THE ARCHITECT SHOULD ALSO | | | SCHEDULE A TIME TO DISCUSS THE SPECIFIC INCONSISTENCIES | | | WITH STAFF): A) BUILDING AREA CALCULATIONS. B) FAR | | | CALCULATIONS AND DIAGRAMS. | | | | | | [STAFF RESPONSE: PLEASE HAVE THE ARCHITECT CONTACT | | | STAFF DIRECTLY TO CLARIFY THE CALCULATIONS.] | | | | | | | | | 7.) PLEASE PROVIDE MORE INFORMATION ON WHICH OPTION THE | | | PROJECT WILL SATISFY PER S.94-111(T)(5) OF THE ZLDRS, | | | SINCE THE PROJECT WILL EXCEED THE SOFT MAXIMUM (BUT AT | | | UNDER 50%). IT IS ASSUMED THAT THE APPLICANT WILL | | | COMPLY WITH THE TRANSPORTATION DEMAND MANAGEMENT (TDM) | | | REQUIREMENTS, BUT STAFF WILL NEED THE INFORMATION ON | | | HOW THE PROJECT WILL ?EARN? THE ADDITIONAL PARKING | | | SPACES (ABOVE THE SOFT MAX). IT APPEARS THAT THE | | | PROJECT EXCEEDS THE SOFT MAXIMUM BY 60 PARKING SPACES | | | (PLEASE CHECK CALCULATIONS). THERE MUST BE A CLEAR | | | UNDERSTANDING OF HOW THIS WILL BE ACHIEVED BY DAC. | | | | | | | | | | | | STREETSCAPE REQUIREMENTS: | | | | | | 1.) A SIDEWALK WITH A MINIMUM OF 8 FT. CLEAR WIDTH | | | SHALL BE PROVIDED ALONG THE BUILDING FRONTAGE. PRIVATE | | | SIDEWALK WHICH SERVE AS AN EXTENSION OF THE PUBLIC | | | SIDEWALK SHALL COMPLY WITH THE STREETSCAPE | | | REQUIREMENTS, SHALL MATCH THE PUBLIC SIDEWALK IN DESIGN | | | AND MATERIAL, AND SHALL PROVIDE A SEAMLESS TRANSITION | | | BETWEEN THE TWO. PLEASE DEMONSTRATE IN THE PLANS AND | | | PROVIDE DIMENSIONS TO ILLUSTRATE COMPLIANCE WITH THE | | | ZLDRS. | | | | | | [STAFF RESPONSE: DIMENSIONS ARE NOW PROVIDED IN THE | | | SITE PLAN (SHEET C-103); HOWEVER, THE 8 FT. CLEAR | | | SIDEWALK REQUIREMENT DOES NOT APPEAR TO HAVE BEEN MET | | | ALONG SOUTH DIXIE HIGHWAY. A LANDSCAPE PLANTER SEEMS TO | | | INTERRUPT THE 8 FT. CLEARANCE. WHAT IS THE PURPOSE OF | | | THE PLANTER ALONG SOUTH DIXIE HIGHWAY? CAN THIS BE | | | SHIFTED OR ELIMINATED TO RESOLVE THE ISSUE? | | | ADDITIONALLY, PLEASE CHECK DIMENSIONS, THE SIDEWALK | | | DIMENSIONS ALSO CONFLICT WITH THE DIMENSIONS PROVIDED | | | IN THE LANDSCAPE PLAN (WHICH SHOWS THE 8 FT. CLEARANCE | | | HAS BEEN MET).). | | | | | | | | | 2.) REQUIRED BICYCLE PARKING IS NOW PROVIDED ALONG THE | | | STREET FRONTAGE; HOWEVER, THE CALCULATIONS, THE | | | DEPICTION IN THE PLANS AND THE DETAIL ARE ALL | | | INCONSISTENT. PLEASE ADDRESS. | | | | | | [STAFF RESPONSE: THERE ARE STILL ISSUES WITH THE | | | BICYCLE PARKING CALCULATIONS. STAFF WOULD NEED TO SEE A | | | BREAKDOWN OF PARKING PROVIDED FOR COMMERCIAL (INCLUDING | | | HOTEL) AND RESIDENTIAL USES SEPARATELY TO DETERMINE IF | | | THE CALCULATIONS AND REQUIREMENT CORRECTLY AND | | | INCOMPLIANCE WITH THE STANDARDS FOR BICYCLE PARKING IN | | | S.94-111 OF THE ZLDRS. ADDITIONALLY, WHERE IS THE | | | BICYCLE RACK DETAIL(S) FOR THE PROJECT? THE DETAIL MUST | | | BE INCLUDED IN THE PLAN SET, AS THE CITY HAS DESIGN | | | STANDARDS FOR BICYCLE PARKING. PLEASE PROVIDE TO | | | DEMONSTRATE COMPLIANCE WITH THE ZLDRS.] | | | | | | | | | 3.) DRIVEWAYS AND CURB CUTS SHALL BE DESIGNED TO | | | MINIMIZE THE NEGATIVE IMPACT IN THE PEDESTRIAN PATH OF | | | TRAVEL. DRIVEWAYS SHALL MAINTAIN THE SIDEWALK | | | ELEVATION. PLEASE PROVIDE A SECTION PARALLEL TO THE | | | STREET TO DEMONSTRATE COMPLIANCE. [ZLDR | | | S.94-113(D)(10)] | | | | | | [STAFF RESPONSE: PARTIALLY ADDRESSED. ALL PLANS SHALL | | | MATCH FOR CONSISTENCY. CURBS ARE STILL SHOWN ALONG | | | LAKEVIEW AVENUE WHERE THE DRIVEWAY MEETS THE SIDEWALK | | | ELEVATION.] | | | | | | | | | 4.) CURB CUTS, PARKING ENTRANCES, EXITS AND DRIVEWAYS | | | SHALL BE SEPARATED AT LEAST 10 FT. TO MINIMIZE THE | | | IMPACT OF A CONTIGUOUS CURB CUTS ON THE PEDESTRIAN | | | ENVIRONMENT. THE DIMENSION FOR THE CURB CUT SEPARATION | | | AT THE SOUTH INGRESS/EGRESS POINT HAS NOT BEEN PROVIDED | | | TO DEMONSTRATE COMPLIANCE. [ZLDR S.94-111(O)] | | | | | | [STAFF RESPONSE: PARTIALLY ADDRESSED. CURB CUT | | | SEPARATION MUST EXTEND INTO THE DRIVEWAY APRON TO | | | PROVIDE ADEQUATE SAFETY FOR PEDESTRIANS (PURPOSE OF THE | | | SEPARATION)]. | | | | | | | | | ARCHITECTURAL COMMENTS: | | | | | | 1.) THE MATERIAL USED ON THE BUILDING IS NOW NOTED IN | | | THE ARCHITECTURAL ELEVATIONS. PLEASE NOTE THAT PER | | | TABLE IV-4, TINTED OR REFLECTIVE GLASS IS NOT | | | PERMITTED. THE ELEVATIONS INDICATE THAT REFLECTIVE | | | GLASS WILL BE USED. PLEASE ADDRESS. | | | | | | 2.) STAFF IS REQUESTING A PHONE CONVERSATION TO DISCUSS | | | THE PROPOSED WALL TREATMENT ON THE BLANK FA?ADE ALONG | | | THE INTERIOR SIDE SETBACK. THE PROPOSED TREATMENT DOES | | | NOT APPEAR TO BE CONSISTENT WITH THE DMP CODE FOR BLANK | | | WALL FA?ADE TREATMENT. PLEASE WORK WITH STAFF TO | | | ADDRESS THIS CONCERN. | | | | | | 3.) PER HISTORIC'S EMAIL DATED 8/9/22, PLEASE SHOW | | | DETAIL AND/OR LOCATION OF THE PILASTERS AND WOOD BEANS | | | IN THE PROJECT. | | | | | | | | | INSTRUCTIONS FOR RESUBMITTAL: | | | | | | * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN | | | WRITTEN FORMAT. | | | | | | * WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF FOUR | | | (4) PAPER COPIES - 2 SETS IN FULL COLOR, ONE REDUCED | | | COPY IN 11 INCHES X 17 INCHES, AND AN ELECTRONIC COPY | | | OF ALL PLANS AND DOCUMENTS. | | | | | | * ANY CHANGES ON THE RESUBMITTED PLANS MAY RESULT IN | | | ADDITIONAL COMMENTS. | | | | | | * PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20% OF THE ORIGINAL APPLICATION FEE. [STAFF | | | NOTE: NO FEE IS REQUIRED FOR THE NEXT RESUBMITTAL ? THE | | | 7/5/22 PLANS SHOW THE APPLICANT IS WORKING WITH STAFF | | | TO ADDRESS OUTSTANDING COMMENTS.] | | | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | | QUESTIONS. | | | | | | | | | CONDITIONS: | | | | | | * THE PROJECT SHALL OBTAIN LEED CERTIFICATION FROM THE | | | LEADERSHIP ON ENVIRONMENTAL DESIGN (LEED) OR A SIMILAR | | | NATIONALLY ACCREDITED ORGANIZATION. ALL REQUIREMENTS | | | AND TIMEFRAMES SHALL BE MET PURSUANT TO SEC. | | | 94135(E.)(2.)(5) OF THE ZONING AND LAND DEVELOPMENT | | | REGULATIONS (ZLDRS). | | | | | | * THE PROJECT EXCEEDS THE SOFT MAXIMUM REQUIREMENT FOR | | | PARKING (BUT NOT OVER 50%). A CONTRIBUTION TO THE | | | TRANSIT OPERATION FUND WILL BE REQUIRED. [ZLDR | | | S.94-111] | | | | | | * A RESTRICTIVE COVENANT, OUTLINING THE OPERATION OF | | | THE PROPOSED MECHANICAL PARKING SHALL BE EXECUTED ON | | | CITY APPROVED FORMS AND RECORDED IN THE PUBLIC RECORDS. | | | | | | * THE PROJECT SHALL COMPLY WITH THE DELIVERY/SERVICE | | | VEHICLES OPERATION, OVERALL CURBSIDE MANAGEMENT AND | | | VALET OPERATIONS ONSITE PER THE ?320 LAKEVIEW - | | | DELIVERY MANAGEMENT AND VALET OPERATIONS SUMMARY, WEST | | | PALM BEACH, FLORIDA, KIMLEY-HORN #140998000,? PREPARED | | | ON AUGUST 12, 2022, BY CHRISTOPHER W. HEGGEN, P.E., OF | | | KIMLEY-HORN AND ASSOCIATES. | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
07-20-2022 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
07-20-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
07-20-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-07-20 15:43:08 | GENERAL COMMENTS: | | | | | | 1.) IT IS RECOMMENDED THAT THE APPLICANT HOLD OUTREACH | | | MEETINGS WITH THE RESIDENTS OF ONE CITY PLAZA | | | CONDOMINIUM, AS THE PROPOSED PROJECT WILL HAVE A DIRECT | | | IMPACT ON THE ADJACENT RESIDENTIAL CONDO BUILDING. | | | | | | [STAFF RESPONSE: IN PROGRESS. ACCORDING TO THE | | | APPLICANT?S PPRC RESPONSE LETTER (7/5/22), THE | | | APPLICANT IS AWARE THAT IT IS NECESSARY TO ENGAGE WITH | | | THE NEIGHBORS PRIOR TO THE PROJECT PROCEEDING TO A DAC | | | MEETING.] | | | | | | 2.) ALTHOUGH THE PROJECT IS WITHIN THE TRAFFIC | | | CONCURRENCY EXCEPTION AREA (TCEA), A LETTER FROM THE | | | PALM BEACH COUNTY TRAFFIC DIVISION IS STILL REQUIRED. | | | PLEASE CONTACT THE PALM BEACH COUNTY TRAFFIC DIVISION | | | AT (561) 684-4030 FOR INFORMATION ON HOW TO OBTAIN THE | | | REQUIRED TRAFFIC LETTER. | | | | | | [STAFF RESPONSE: IN PROGRESS. ACCORDING TO THE | | | APPLICANT'S PPRC RESPONSE LETTER (7/5/22), THE TPS | | | ANALYSIS IS CURRENTLY UNDER REVIEW AT PALM BEACH | | | COUNTY. THIS LETTER IS REQUIRED PRIOR TO THE PROJECT | | | PROCEEDING TO A DAC MEETING.) | | | | | | 3.) A PREDETERMINATION LETTER FROM THE FLORIDA | | | DEPARTMENT OF TRANSPORTATION (FDOT) SHALL BE REQUIRED | | | FOR THE PROPOSED ACCESS POINTS AND/OR STREETSCAPE | | | IMPROVEMENTS ALONG SOUTH DIXIE HWY, LAKEVIEW AVENUE AND | | | OKEECHOBEE BOULEVARD (FDOT CONTROLLED ROWS). THIS | | | PREDETERMINATION LETTER IS REQUIRED PRIOR TO THE | | | SCHEDULING OF THIS APPLICATION FOR THE DOWNTOWN ACTION | | | COMMITTEE (DAC) TO ENSURE THE ACCESS POINTS AND | | | STREETSCAPE REQUIREMENTS ARE FEASIBLE. | | | | | | [STAFF RESPONSE: IN PROGRESS. ACCORDING TO THE | | | APPLICANT'S PPRC RESPONSE LETTER (7/5/22), A | | | PRE-APPLICATION MEETING WITH FDOT WAS HELD ON 5/19/22 | | | AND A LETTER WILL BE PROVIDED TO STAFF UPON RECEIPT. A | | | LETTER FROM FDOT STATING THAT THE PROPOSED IMPROVEMENTS | | | ALONG THE FDOT CONTROLLED ROWS IS REQUIRED PRIOR TO THE | | | PROJECT PROCEEDING TO A DAC MEETING.] | | | | | | 4.) PLEASE ENSURE ALL PLAN SHEETS MATCH FOR CONSISTENCY | | | (I.E. SITE PLAN, LANDSCAPE PLAN, CIVIL PLANS, ETC.) | | | | | | [STAFF RESPONSE: NOT ADDRESSED. THE ARCHITECT IS AWARE | | | THAT THERE ARE STILL INCONSISTENCIES WITH THE PLANS | | | WITHIN THE PLAN SET. THESE INCONSISTENCIES WILL BE | | | ADDRESSED.] | | | | | | 5.) ALL BUILDING SETBACKS SHALL BE PROVIDED ON SHEET | | | A0.04 (BUILDING SETBACKS) TO DEMONSTRATE CONSISTENCY | | | WITH THE MINIMUM REQUIREMENTS OF THE ZLDRS. SOME | | | BUILDING SETBACKS APPEAR TO BE REMOVED/NOT INCLUDED IN | | | THE LATEST PLAN SET. | | | | | | 6.) IN THE ARCHITECTURAL PLAN PACKET, ON THE COVER | | | SHEET/TABLE OF CONTENTS: A) SHEETS FOR ARCHITECTURAL | | | RENDERINGS ARE MISLABELED. B) CORRECT PLAN SHEET PAGES | | | FOR LEVELS 19 THROUGH ROOFTOP LEVEL PLAN. | | | | | | 7.) AS DISCUSSED WITH THE ARCHITECT ON 7/19/2022, THE | | | PROJECT CALCULATIONS WILL NEED TO BE REVISED/CORRECTED | | | THROUGHOUT THE PLAN SHEETS FOR ACCURACY. THE ARCHITECT | | | ACKNOWLEDGES THESE INCONSISTENCIES WITH THE PROJECT | | | NUMBERS AND WILL ADDRESS (THE ARCHITECT SHOULD ALSO | | | SCHEDULE A TIME TO DISCUSS THE SPECIFIC INCONSISTENCIES | | | WITH STAFF): A) BUILDING AREA CALCULATIONS. B) FAR | | | CALCULATIONS AND DIAGRAMS. C) ACTIVE USE CALCULATIONS. | | | D) LANDSCAPE PLAN OPEN SPACE CALCULATIONS AND DEPICTION | | | VS. SITE PLANS. E) PARKING CALCULATIONS VS. SITE PLAN. | | | | | | 8.) AS DISCUSSED WITH THE ARCHITECT ON 7/19/22, STAFF | | | WILL NEED TO VERIFY WITH URBAN DESIGN IF THE DOG RUN | | | AREA MEETS THE FENESTRATION REQUIREMENTS OF THE DAC | | | CODE. STAFF WILL LET THE APPLICANT KNOW AS SOON AS | | | FEEDBACK IS PROVIDED. | | | | | | | | | SITE PLAN COMMENTS: | | | | | | 1.) THE BUILDING FRONTAGE ALONG OKEECHOBEE BOULEVARD | | | WHERE THERE IS A PLANAR BREAK APPEARS TO BE OUTSIDE OF | | | THE SETBACK RANGE. PLEASE ADDRESS OR REQUEST A VARIANCE | | | FROM THE REQUIREMENT. | | | | | | 2.) GROUND LEVEL ACTIVE USE REQUIREMENT ALONG | | | OKEECHOBEE BOULEVARD HAS NOT BEEN MET. A MINIMUM OF | | | 131.8 LINEAR FEET (65%) OF ACTIVE USE IS REQUIRED. ONLY | | | 121.75 LINEAR FEET HAS BEEN PROVIDED ALONG OKEECHOBEE | | | BLVD. [ZLDR S.94-135, TABLE IV-70] | | | | | | 3.) PROVIDE THE ROOFTOP STORAGE AREA CALCULATIONS | | | (HURRICANE EMERGENCY STORAGE SPACE FOR ROOFTOP | | | AMENITIES AS NOTED IN THE APPLICANT'S PPRC RESPONSE | | | LETTER - 7/5/22). PER S.94-109, THE STORAGE AREA IS | | | PERMITTED AS LONG AS IT DOES NOT EXCEED 30%. PLEASE | | | DEMONSTRATE CONSISTENCY WITH THE ZLDRS. | | | | | | | | | PARKING REQUIREMENTS: | | | | | | 1.) PLEASE CHECK THE PARKING CALCULATIONS. THERE SEEMS | | | TO BE ERRORS IN THE CALCULATIONS (I.E. PARKING COUNT | | | DOES NOT MATCH THE PARKING PROVIDED IN THE SITE PLAN). | | | PLEASE CORRECT ANY ERRORS FOR CONSISTENCY. | | | | | | [STAFF RESPONSE: NOT ADDRESSED. INCONSISTENCIES WITH | | | THE PARKING CALCULATIONS AND PARKING DEPICTED IN THE | | | PLANS HAVE NOT BEEN ADDRESSED. THE ARCHITECT IS | | | REQUESTED TO CONTACT STAFF TO GO OVER THE SPECIFIC | | | INCONSISTENCIES TO ENSURE THE ERRORS ARE ADDRESSED | | | CORRECTLY.] | | | | | | 2.) THE APPLICANT'S PPRC RESPONSE LETTER (7/5/22) | | | STATES THAT A DELIVERY MANAGEMENT, CURBSIDE MANAGEMENT | | | AND VALET QUEUING /OPERATIONS EVALUATION HAS BEEN | | | PREPARED AND IS INCLUDED WITH THE RESUBMITTAL PACKET; | | | HOWEVER, THIS DOCUMENT CANNOT BE FOUND. PLEASE CLARIFY | | | AND/OR PROVIDE AS THIS IS A REQUIRED DOCUMENT FOR THE | | | PROJECT. | | | | | | 3.) THE PROJECT SHALL COMPLY WITH THE MINIMUM LOADING | | | REQUIREMENTS IN ZLDR S.94-485. PLEASE PROVIDE | | | CALCULATIONS AND DIMENSIONS TO DEMONSTRATE COMPLIANCE. | | | | | | [STAFF RESPONSE: NOT ADDRESSED. LOADING ZONE | | | CALCULATIONS AND DIMENSION HAVE NOT BEEN PROVIDED IN | | | THE PLANS. BASED ON STAFF?S CALCULATIONS, A MINIMUM OF | | | THREE 10 FT. X 50 FT. LOADING SPACES ARE REQUIRED FOR | | | THE PROJECT. IF THE APPLICANT BELIEVES LESS ARE | | | REQUIRED, THE CALCULATIONS WILL NEED TO BE PROVIDED TO | | | DEMONSTRATE COMPLIANCE.] | | | | | | | | | STREETSCAPE REQUIREMENTS: | | | | | | 1.) A SIDEWALK WITH A MINIMUM OF 8 FT. CLEAR WIDTH | | | SHALL BE PROVIDED ALONG THE BUILDING FRONTAGE. PRIVATE | | | SIDEWALK WHICH SERVE AS AN EXTENSION OF THE PUBLIC | | | SIDEWALK SHALL COMPLY WITH THE STREETSCAPE | | | REQUIREMENTS, SHALL MATCH THE PUBLIC SIDEWALK IN DESIGN | | | AND MATERIAL, AND SHALL PROVIDE A SEAMLESS TRANSITION | | | BETWEEN THE TWO. PLEASE DEMONSTRATE IN THE PLANS AND | | | PROVIDE DIMENSIONS TO ILLUSTRATE COMPLIANCE WITH THE | | | ZLDRS. | | | | | | [STAFF RESPONSE: ALTHOUGH DIMENSIONS HAVE BEEN PROVIDED | | | IN SHEET C-100 OF THE CIVIL PLANS, STAFF IS REQUESTING | | | THAT THE DIMENSIONS ARE ALSO PROVIDED IN THE SITE | | | PLAN.] | | | | | | 2.) REQUIRED BICYCLE PARKING IS NOW PROVIDED ALONG THE | | | STREET FRONTAGE; HOWEVER, THE CALCULATIONS, THE | | | DEPICTION IN THE PLANS AND THE DETAIL ARE ALL | | | INCONSISTENT. PLEASE ADDRESS. | | | | | | 3.) DRIVEWAYS AND CURB CUTS SHALL BE DESIGNED TO | | | MINIMIZE THE NEGATIVE IMPACT IN THE PEDESTRIAN PATH OF | | | TRAVEL. DRIVEWAYS SHALL MAINTAIN THE SIDEWALK | | | ELEVATION. PLEASE PROVIDE A SECTION PARALLEL TO THE | | | STREET TO DEMONSTRATE COMPLIANCE. [ZLDR | | | S.94-113(D)(10)] | | | | | | [STAFF RESPONSE: PARTIALLY ADDRESSED. ALTHOUGH THE | | | CIVIL PLAN SHOWS THE SIDEWALK CONNECTION AT THE | | | DRIVEWAY IS CURBLESS, STAFF IS REQUESTING THE SAME | | | CONSISTENCY IN THE SITE PLAN. ALSO, THE REQUESTED | | | SECTION DETAIL WAS NOT PROVIDED.] | | | | | | 4.) CURB CUTS, PARKING ENTRANCES, EXITS AND DRIVEWAYS | | | SHALL BE SEPARATED AT LEAST 10 FT. TO MINIMIZE THE | | | IMPACT OF A CONTIGUOUS CURB CUTS ON THE PEDESTRIAN | | | ENVIRONMENT. THE DIMENSION FOR THE CURB CUT SEPARATION | | | AT THE SOUTH INGRESS/EGRESS POINT HAS NOT BEEN PROVIDED | | | TO DEMONSTRATE COMPLIANCE. [ZLDR S.94-111(O)] | | | | | | | | | ARCHITECTURAL COMMENTS: | | | | | | 1.) IT IS NOTED IN THE APPLICANT'S PPRC RESPONSE LETTER | | | (7/5/22) THAT A "GREEN WALL TREATMENT" IS PROPOSED ON | | | THE EAST WALLS. PLEASE CLARIFY WHAT THIS MEANS AND NOTE | | | IN THE PLANS. | | | | | | 2.) IT IS NOT CLEAR TO WHAT THE REQUESTED ARCHITECTURAL | | | TREATMENT WILL BE BETWEEN THE PROPOSED BUILDING AND THE | | | NEIGHBORING ONE CITY PLAZA. THE PROJECT NOW PROPOSES A | | | 7 FT. SETBACK BETWEEN BUILDINGS AT OKEECHOBEE BOULEVARD | | | AND LAKEVIEW AVENUE (MIDDLE INTERIOR PROPOSES A 0 FT. | | | SETBACK). STAFF HAD SPOKE TO THE ARCHITECT AND | | | SUGGESTED A FAUX FACADE/WALL THE HEIGHT OF THE ENTIRE | | | PODIUM TO PROVIDE SOME CONTINUITY BETWEEN BUILDINGS. | | | | | | | | | SIGNAGE: | | | | | | 1.) WILL THERE BE ANY SIGNAGE PROPOSED FOR THIS | | | PROJECT? IF SO, PLEASE PROVIDE THE INFORMATION ON THE | | | PROPOSED SIGNAGE. IF THE PROJECT SIGNAGE HAS YET TO BE | | | DETERMINED, A NOTE STATING THAT ALL PROJECT SIGNAGE | | | SHALL COMPLY WITH SEC. 94-110, OF THE ZONING AND LAND | | | DEVELOPMENT REGULATIONS (ZLDRS) WILL BE REQUIRED IN THE | | | PLANS. | | | | | | [STAFF RESPONSE: THE APPLICANT'S PPRC RESPONSE LETTER | | | (7/5/22) STATES THAT A COMPLIANCE NOTE HAS BEEN ADDED | | | IN THE PLANS; HOWEVER, THIS NOTE COULD NOT BE FOUND. | | | THE RESPONSE LETTER ALSO STATES THAT THE NOTE COULD BE | | | FOUND ON SHEET C-100 (ENGINEERING PLANS) ? THE NOTE IS | | | MORE APPROPRIATE IN THE ARCHITECTURAL PLANS.] | | | | | | | | | | | | INSTRUCTIONS FOR RESUBMITTAL: | | | | | | * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN | | | WRITTEN FORMAT. | | | | | | * WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF FOUR | | | (4) PAPER COPIES, ONE REDUCED COPY IN 11 INCHES X 17 | | | INCHES, AND AN ELECTRONIC COPY OF ALL PLANS AND | | | DOCUMENTS. | | | | | | * ANY CHANGES ON THE RESUBMITTED PLANS MAY RESULT IN | | | ADDITIONAL COMMENTS. | | | | | | * PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20% OF THE ORIGINAL APPLICATION FEE. [STAFF | | | NOTE: NO FEE IS REQUIRED FOR THE NEXT RESUBMITTAL ? THE | | | 7/5/22 PLANS SHOW THE APPLICANT IS WORKING WITH STAFF | | | TO ADDRESS OUTSTANDING COMMENTS.] | | | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | | QUESTIONS. | | | | | | | | | CONDITIONS: | | | | | | * THE PROJECT SHALL OBTAIN LEED CERTIFICATION FROM THE | | | LEADERSHIP ON ENVIRONMENTAL DESIGN (LEED) OR A SIMILAR | | | NATIONALLY ACCREDITED ORGANIZATION. ALL REQUIREMENTS | | | AND TIMEFRAMES SHALL BE MET PURSUANT TO SEC. | | | 94135(E.)(2.)(5) OF THE ZONING AND LAND DEVELOPMENT | | | REGULATIONS (ZLDRS). | | | | | | * THE PROJECT EXCEEDS THE SOFT MAXIMUM REQUIREMENT FOR | | | PARKING (BUT NOT OVER 50%). A CONTRIBUTION TO THE | | | TRANSIT OPERATION FUND WILL BE REQUIRED. [ZLDR | | | S.94-111] | | | | | | * A RESTRICTIVE COVENANT, OUTLINING THE OPERATION OF | | | THE PROPOSED MECHANICAL PARKING SHALL BE EXECUTED ON | | | CITY APPROVED FORMS AND RECORDED IN THE PUBLIC RECORDS. | | | | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
06-08-2022 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
06-08-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
06-08-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-06-08 08:22:40 | GENERAL COMMENTS: | | | | | | 1.) IT IS RECOMMENDED THAT THE APPLICANT HOLD OUTREACH | | | MEETINGS WITH THE RESIDENTS OF ONE CITY PLAZA | | | CONDOMINIUM, AS THE PROPOSE PROJECT WILL HAVE A DIRECT | | | IMPACT ON THE ADJACENT RESIDENTIAL CONDO BUILDING. | | | | | | 2.) ALTHOUGH THE PROJECT IS WITHIN THE TRAFFIC | | | CONCURRENCY EXCEPTION AREA (TCEA), A LETTER FROM THE | | | PALM BEACH COUNTY TRAFFIC DIVISION, IS STILL REQUIRED. | | | PLEASE CONTACT THE PALM BEACH COUNTY TRAFFIC DIVISION | | | AT (561) 684-4030 FOR INFORMATION ON HOW TO OBTAIN THE | | | REQUIRED TRAFFIC LETTER. | | | | | | 3.) A PREDETERMINATION LETTER FROM THE FLORIDA | | | DEPARTMENT OF TRANSPORTATION (FDOT) SHALL BE REQUIRED | | | FOR THE PROPOSED ACCESS POINTS AND/OR STREETSCAPE | | | IMPROVEMENTS ALONG SOUTH DIXIE HWY, LAKEVIEW AVENUE AND | | | OKEECHOBEE BOULEVARD (FDOT CONTROLLED ROWS). THIS | | | PREDETERMINATION LETTER IS REQUIRED PRIOR TO THE | | | SCHEDULING OF THIS APPLICATION FOR THE DOWNTOWN ACTION | | | COMMITTEE (DAC) TO ENSURE THE ACCESS POINTS AND | | | STREETSCAPE REQUIREMENTS ARE FEASIBLE. | | | | | | 4.) ACCORDING TO THE PARKING CALCULATIONS PROVIDED IN | | | THE PLAN SHEETS, THE SOFT MAXIMUM HAS BEEN EXCEEDED | | | (BUT NOT OVER 50%), AND THEREFORE, A CONTRIBUTION TO | | | THE TRANSIT OPERATION FUND WILL BE REQUIRED. [ZLDR | | | S.94-111] | | | | | | 5.) ALL NEW DEVELOPMENT WITHIN THE OBD SHALL OBTAIN | | | LEED CERTIFICATION FROM THE LEADERSHIP ON ENVIRONMENTAL | | | DESIGN (LEED) OR A SIMILAR NATIONALLY ACCREDITED | | | ORGANIZATION. ALL REQUIREMENTS AND TIMEFRAMES SHALL BE | | | MET PURSUANT TO SEC. 941-35(E.)(2.)(5.). | | | | | | 6.) ALL BUILDING SETBACKS SHALL BE MEASURED FROM THE | | | BACK OF CURB. PLAN SHEETS SHOWS THAT THE SETBACK | | | DIMENSIONS WERE TAKEN FROM THE FRONT OF THE CURB, WHICH | | | IS INCORRECT. PLEASE ADDRESS FOR CONSISTENCY. | | | | | | 7.) PLEASE ENSURE ALL PLAN SHEETS MATCH FOR CONSISTENCY | | | (I.E. SITE PLAN, LANDSCAPE PLAN, CIVIL PLANS, ETC.). | | | | | | 8.) AT LEAST ONE HARD COPY SET OF FULL COLORED | | | PLANS/DRAWINGS (I.E. ELEVATIONS, FAR CALCULATIONS | | | SHEETS, ETC.) SHALL BE REQUIRED IN ALL FUTURE | | | RESUBMITTALS. | | | | | | | | | SITE PLAN COMMENTS: | | | | | | 1.) THE ENTIRE BUILDING FRONTAGE ALONG SOUTH DIXIE | | | HIGHWAY, INCLUDING THE GROUND LEVEL, SHALL BE PROVIDED | | | WITHIN THE MINIMUM (16 FEET) AND MAXIMUM (30 FEET) | | | BUILDING SETBACK RANGE. THE PROPOSED BUILDING FRONTAGE | | | ALONG SOUTH DIXIE HIGHWAY (A PRIMARY PEDESTRIAN STREET) | | | APPEARS TO BE LOCATED OUTSIDE OF THIS SETBACK RANGE. | | | THIS CAN BE ADDRESSED BY RECONFIGURING THE HOTEL LOBBY | | | SPACE TO MEET THE REQUIRED BUILDING SETBACKS. [ZLDR | | | S.94-135, TABLE IV-70] | | | | | | 2.) THE PROPOSED PUBLIC OPEN SPACE (PLAZA) AREA SHALL | | | ABUT ACTIVE USES ON A MINIMUM OF TWO (2) SIDES. THIS | | | REQUIREMENT IS CURRENTLY NOT MET; THE PLAZA AREA | | | CURRENTLY ABUTS ACTIVE USE ONLY ON ONE (1) SIDE. [ZLDR | | | S.94-108, TABLE IV-7] | | | | | | 3.) THE STAIRWELL LOCATED WITHIN THE BUILDING ALONG | | | LAKEVIEW AVENUE, AT THE NORTHWEST CORNER OF THE GROUND | | | LEVEL CAFE SHALL BE RELOCATED AWAY FROM THE CORNER. | | | EFFORT SHALL BE MADE TO CONCEAL THE STAIRWELL FROM THE | | | BUILDING FRONTAGE BY ACTIVE USES ALONG THIS PROMINENT | | | PEDESTRIAN STREET FRONTAGE (I.E. PUSH THE STAIRWELL | | | BACK INTO THE SPACE). | | | | | | 4.) THE CONDITIONAL SETBACK (MINIMUM OF 31 FT.) SHALL | | | APPLY TO ALL STORIES ABOVE THE 5TH STORY TO CONCEAL ALL | | | PARKING AND/OR NON-ACTIVE USE LINERS. THIS REQUIREMENT | | | HAS NOT BEEN MET ALONG LAKEVIEW AVENUE. [ZLDR S.94-135, | | | TABLE IV-70] | | | | | | 5.) THE BUILDING FOOTPRINT CANNOT EXCEED 60% AT THE 6TH | | | AND 7TH LEVELS, UNLESS IN COMPLIANCE WITH THE | | | CONDITIONAL SETBACK. THE CONDITIONAL SETBACK | | | REQUIREMENT HAS NOT BEEN MET TO ALLOW FOR A GREATER | | | BUILDING FOOTPRINT FOR PARKING BEYOND THE MAXIMUM 60% | | | FOR THESE LEVELS. [ZLDR S.94-135, TABLE IV-70] | | | | | | 6.) MINIMUM ACTIVE USE REQUIREMENTS ALONG THE STREET | | | FRONTAGES CANNOT BE VERIFIED. PLEASE PROVIDE DIMENSIONS | | | (I.E. LF) FOR ALL ACTIVE USE AREAS SO THAT STAFF CAN | | | VERIFY THE CALCULATIONS. ALSO, PLEASE NOTE THAT | | | NON-ACTIVE USES, SUCH AS MAILROOMS, STORAGE, ETC., | | | SHALL NOT BE COUNTED TOWARDS THE MINIMUM ACTIVE USE | | | REQUIREMENT; SOME OF THESE USES HAVE BEEN INCLUDED | | | TOWARDS THE ACTIVE USE REQUIREMENT CALCULATIONS WHICH | | | IS INCORRECT. [ZLDR S.94-135, TABLE IV-70] | | | | | | 7.) THE MINIMUM ACTIVE USE LINER DEPTH FOR COMMERCIAL | | | USES IS 20 FT. ABOVE THE GROUND LEVEL. THERE ARE | | | EXECUTIVE MANAGEMENT TEAM HOTEL OFFICES ALONG THE | | | LAKEVIEW FRONTAGE THAT DOES NOT COMPLY WITH THIS | | | MINIMUM REQUIREMENT (PROVIDED IS 15 FT.). [ZLDR | | | S.94-135, TABLE IV-70] | | | | | | 8.) PLEASE PROVIDE THE DIMENSIONS FOR ALL AREAS IN THE | | | ACTIVE USE LINER DEPTH CALCULATIONS TO DEMONSTRATE | | | COMPLIANCE WITH THE ZLDRS. [ZLDR S.94-135, TABLE IV-70] | | | | | | 9.) THERE ARE SOME ABBREVIATED NOTES THAT STAFF IS | | | UNFAMILIAR WITH (I.E. FCC, BOH, T, RVG, FO, PR, HK, L, | | | ETC.) TO DEFINE SPACES IN THE PLAN SHEETS. PLEASE | | | CLARIFY WHAT THESE SPACES ARE IN THE PLANS SO THAT | | | STAFF CAN DETERMINE IF THESE SPACES QUALIFY IN THE | | | ACTIVE USE, FAR, ETC. CALCULATIONS. | | | | | | 10.) PLEASE EXPLAIN THE ENGINEERING MANAGEMENT ROOM. | | | STAFF NEEDS TO DETERMINE IF THIS SPACE IS CONSIDERED AN | | | ACTIVE OR NON-ACTIVE USE. THIS SPACE SEEMS TO HAVE BEEN | | | INCLUDED IN THE ACTIVE USE CALCULATIONS ALONG LAKEVIEW | | | AVE. (LEVEL 3). | | | | | | 11.) PLEASE EXPLAIN THE "DOG RUN" AREA. IT WOULD BE | | | HELPFUL TO DESIGN THE SPACE WITH FURNISHINGS TO CONFIRM | | | THAT THE SPACE IS NOT AN EMPTY SPACE WITHIN THE | | | PROJECT. | | | | | | 12.) WHAT TYPE OF STORAGE IS PROVIDED ON LEVELS 2 | | | THROUGH 7? PLEASE PROVIDE MORE INFORMATION/CLARIFY IN | | | THE PLANS. | | | | | | 13.) THE STORAGE AREA SHALL NOT BE PERMITTED ON THE | | | ROOFTOP OF THE BUILDING. ACCORDING TO THE PLANS, AN | | | ENCLOSED STORAGE AREA IS PROVIDED ON THE ROOFTOP. | | | PLEASE ADDRESS. [ZLDR S.94-109, TABLE IV-5] | | | | | | 14.) PLEASE CLEARLY LABEL/DEFINE ALL SPACES IN THE | | | PLANS (I.E. BICYCLE STORAGE AREA). | | | | | | 15.) PLEASE EXPLAIN THE BREAKDOWN OF BUILDING SQUARE | | | FOOTAGE FOR RETAIL + RESTAURANT = 15,720 SQ. FT. THE | | | CALCULATIONS DO NOT ADD UP. | | | | | | 16.) FAR CALCULATIONS SHALL INCLUDE ALL FULLY ENCLOSED | | | STORAGE SPACES (AIR CONDITIONED AND NON-AIR | | | CONDITIONED), STAIRS AND ELEVATORS, ENCLOSED AREAS ON | | | THE ROOFTOP, EXTERNAL UNENCLOSED CIRCULATION AREAS, | | | ETC. (PLEASE REFER TO THE DEFINITION FOR "GROSS | | | BUILDING AREA"). THERE ARE SOME SPACES IN THE PLANS | | | THAT SHOULD HAVE BEEN INCLUDED IN THE FAR CALCULATIONS | | | BUT HAVE BEEN EXCLUDED FROM THE CALCULATIONS. PLEASE | | | NOTE THAT THE MAXIMUM ALLOWABLE FAR IN OBD-25 | | | SUBDISTRICT IS 7.0. [ZLDR S.94-135, TABLE IV-70] | | | | | | | | | PARKING REQUIREMENTS: | | | | | | 1.) PLEASE CHECK THE PARKING CALCULATIONS. THERE SEEMS | | | TO BE ERRORS IN THE CALCULATIONS (I.E. PARKING COUNT | | | DOES NOT MATCH THE PARKING PROVIDED IN THE SITE PLAN). | | | PLEASE CORRECT ANY ERRORS FOR CONSISTENCY. | | | | | | 2.) PARKING SPACES FOR THE DISABLED SHALL BE PROVIDED | | | ACCORDING TO SUBSECTION 94-485(O) OF THE ZLDRS. | | | ACCORDING TO THE PARKING CALCULATIONS FOR THE PROJECT, | | | THE DISABLE PARKING REQUIREMENT HAS NOT BEEN MET. THE | | | ZLDRS REQUIRES A MINIMUM OF 2% OF PARKING PROVIDED FOR | | | THE DISABLED. [ZLDR S.94-111 AND S94-485(O)]. | | | | | | 3.) PARKING STALL DIMENSIONS SHALL BE PROVIDED IN THE | | | PLANS. PARKING STALL DIMENSIONS SHALL COMPLY WITH THE | | | GENERAL PARKING STANDARDS ACCORDING TO ZLDR | | | S.94-111(C). | | | | | | 4.) THE PLANS IMPLY THAT THERE WILL BE COMPACT PARKING | | | SPACES. PLEASE PROVIDE COMPACT PARKING SPACE | | | CALCULATIONS AND IDENTIFY WHERE THE COMPACT PARKING | | | SPACES WILL BE LOCATED IN THE PROJECT. PROVIDED COMPACT | | | PARKING SHALL COMPLY WITH THE REQUIREMENTS OF ZLDR | | | S.94-485. | | | | | | 5.) THE PROJECT PROPOSES MECHANICAL PARKING. MECHANICAL | | | PARKING SHALL REQUIRE A COMMERCIAL ATTENDANT AT ALL | | | HOURS (24/7/365). SUCH OPERATION SHALL BE ENFORCED | | | THROUGH A RESTRICTIVE COVENANT RECORDED IN THE PUBLIC | | | RECORDS. ALL RESTRICTIVE COVENANT AND OTHER DOCUMENTS | | | REQUIRED TO BE RECORDED SHALL BE ON CITY-APPROVED FORMS | | | AND RECORDED IN THE PUBLIC RECORDS. [ZLDR S.94-111] | | | | | | 6.) THE PROJECT SHALL COMPLY WITH THE MINIMUM LOADING | | | REQUIREMENTS IN ZLDR S.94-485. PLEASE PROVIDE | | | CALCULATIONS AND DIMENSIONS TO DEMONSTRATE COMPLIANCE. | | | [ZLDR S.94-111 AND S.94-485] | | | | | | 7.) WHY IS THE INGRESS AND EGRESS POINTS SO WIDE ALONG | | | OKEECHOBEE BOULEVARD? PLEASE JUSTIFY AND PROVIDE | | | SUPPORT/BACKUP MATERIAL (I.E. AUTO-TURN DIAGRAM), AS | | | STAFF RECOMMENDS THE INGRESS/EGRESS POINT IS REDUCED TO | | | 24 FT. WIDE. | | | | | | 8.) PARKING ENTRANCE/EXIT/DRIVEWAY SHALL NOT BE WIDER | | | THAN 25 FT. AS MEASURED PARALLEL TO THE STREET AT THE | | | CURB. THE DRIVEWAY SEEMS TO EXCEED THE MAXIMUM | | | ALLOWABLE WIDTH ALONG OKEECHOBEE BOULEVARD. [ZLDR | | | S.94-111(O)] | | | | | | 9.) ALL NEW PROJECTS SHALL PROVIDE A FREIGHT DELIVERY | | | PLAN AND ROUTES TO ENSURE DELIVERIES DO NOT IMPACT | | | TRAFFIC OPERATIONS. THERE DOES NOT SEEM TO BE A FREIGHT | | | DELIVERY PLAN WITH THE PROJECT APPLICATION. [ZLDR | | | S.94-135(E)(2)(4)(C.)] | | | | | | 10.) ALL NEW PROJECTS SHALL PROVIDE A CURB SIDE | | | MANAGEMENT PLAN TO PRIORITIZE MULTIMODAL TRAVEL. THERE | | | DOES NOT SEEM TO BE A CURB SIDE MANAGEMENT PLAN [ZLDR | | | S.94-135(E)(2)(4)(D.)] | | | | | | 11.) HOW IS THE REQUIRED BICYCLE PARKING MET FOR THE | | | PROJECT? BICYCLE PARKING SHALL BE CONSISTENT WITH THE | | | REQUIREMENTS SET FORTH IN SEC. 94-111 OF THE ZLDRS. | | | ADDITIONALLY, BICYCLE PARKING CALCULATIONS, PROPOSED | | | RACK AND STORAGE/CHANGE ROOM/SHOWER FACILITY LOCATION | | | SHALL BE CLEAR IN THE PLANS. | | | | | | | | | STREETSCAPE COMMENTS: | | | | | | 1.) A SIDEWALK WITH A MINIMUM OF 8 FT. CLEAR WIDTH | | | SHALL BE PROVIDED ALONG THE BUILDING FRONTAGE. PRIVATE | | | SIDEWALKS WHICH SERVE AS AN EXTENSION OF THE PUBLIC | | | SIDEWALK SHALL COMPLY WITH THE STREETSCAPE | | | REQUIREMENTS, SHALL MATCH THE PUBLIC SIDEWALK IN DESIGN | | | AND MATERIAL, AND SHALL PROVIDE A SEAMLESS TRANSITION | | | BETWEEN THE TWO. PLEASE DEMONSTRATE IN THE PLANS AND | | | PROVIDE DIMENSIONS TO ILLUSTRATE COMPLIANCE WITH THE | | | ZLDRS. [ZLDR S.94-113(D.)(1)] | | | | | | 2.) BICYCLE PARKING SHALL BE PROVIDED AT A MINIMUM OF | | | ONE (1) SPACE PER EVERY 100 FT. OF STREET FRONTAGE. | | | SPECIFICATIONS SHALL MEET CITY APPROVED STANDARDS. | | | PLEASE INCLUDE A BICYCLE RACK DETAIL. [ZLDR | | | S.94-113(D)(9)] | | | | | | 3.) DRIVEWAYS AND CURB CUTS SHALL BE DESIGNED TO | | | MINIMIZE THE NEGATIVE IMPACT IN THE PEDESTRIAN PATH OF | | | TRAVEL. DRIVEWAYS SHALL MAINTAIN THE SIDEWALK | | | ELEVATION. PLEASE PROVIDE A SECTION PARALLEL TO THE | | | STREET TO DEMONSTRATE COMPLIANCE. [ZLDR | | | S.94-113(D.)(10.)] | | | | | | 4.) EXISTING SIDEWALK ADJACENT TO ONE CITY PLAZA SEEMS | | | TO BE INCONSISTENT. PLEASE ADDRESS FOR ACCURACY AND | | | ALSO SHOW HOW THE PROPOSED STREETSCAPE IMPROVEMENTS FOR | | | THE PROJECT WILL CONNECT TO THE EXISTING STREETSCAPE OF | | | THE ADJACENT PROJECT(S). | | | | | | | | | ARCHITECTURAL COMMENTS: | | | | | | 1.) PLANAR BREAKS AT THE GROUND LEVEL AND PODIUM: FOR | | | BUILDING FRONTAGES GREATER THAN 150 FT., NO FACADE | | | SHALL EXCEED 60% OF THE BUILDING FRONTAGE WITHOUT | | | PROVIDING A PLANAR BREAK OR MULTIPLE PLANAR BREAKS A | | | MINIMUM OF 3 FT. IN DEPTH. THE CUMULATIVE HORIZONAL | | | LENGTH OF ALL PLANAR BREAKS SHALL BE GREATER THAN OR | | | EQUAL TO 20% OF THE BUILDING FRONTAGE; BLANK WALLS ARE | | | NOT PERMITTED. PLEASE PROVIDE CALCULATIONS, DIMENSIONS, | | | ETC., IN THE PLANS TO DEMONSTRATE COMPLIANCE WITH THIS | | | REQUIREMENT. THE PLANS PROVIDED | | | DOES NOT SEEM TO COMPLY WITH THIS REQUIREMENT. [TABLE | | | IV-4] | | | | | | 2.) PER THE ZLDRS, "TRANSPARENCY" IS DEFINED AS | | | "BUILDING FENESTRATION ON NON-RESIDENTIAL USES WHICH | | | ALLOWS GROUND FLOOR VISUAL ACCESS BETWEEN A BUILDING | | | AND ITS ACTIVE USES FROM THE PUBLIC SIDEWALK." THE | | | TRANSPARENCY CALCULATIONS APPEARS TO BE | | | INCONSISTENT/INCORRECT WITH THE ELEVATIONS/RENDERINGS | | | PROVIDED IN THE PLAN SET (I.E. STAIRWELL WITHIN THE | | | NORTHWEST CORNER OF THE BUILDING DOES NOT MEET THE | | | DEFINITION OF TRANSPARENCY AND DOES NOT COUNT TOWARDS | | | THE REQUIRED CALCULATIONS AS PROVIDED IN THE | | | TRANSPARENCY CALCULATIONS IN THE PLAN SET). PLEASE | | | CHECK TRANSPARENCY REQUIREMENTS AND CORRECT AS | | | NECESSARY FOR CONSISTENCY. [ZLDR S.94-109 AND S.94-135, | | | TABLE IV-70] | | | | | | 3.) FOR THE EAST ELEVATION (SHEET A2.03), PLEASE | | | PROVIDE A PROFILE OF THE ADJACENT ONE CITY PLAZA CONDO | | | BUILDING TO SHOW HOW THE PROPOSED PROJECT WILL IMPACT | | | THE ADJACENT USE. ADDITIONAL SECTION DRAWINGS MAY BE | | | REQUIRED TO ILLUSTRATE IMPACT. PLEASE CONTACT CRAIG | | | MCPHERSON, DEVELOPMENT SERVICES DEPARTMENT-CSD CUSTOMER | | | SERVICE REPRESENTATIVE @ (561) 805-6684, TO OBTAIN THE | | | ACCURATE DRAWINGS FOR ONE CITY PLAZA TO ASSIST WITH THE | | | EXERCISE. | | | | | | | | | SIGNAGE: | | | | | | 1.) WILL THERE BE ANY SIGNAGE PROPOSED FOR THIS | | | PROJECT? IF SO, PLEASE PROVIDE THE INFORMATION ON THE | | | PROPOSED SIGNAGE. IF PROJECT SIGNAGE HAS YET TO BE | | | DETERMINED, A NOTE STATING THAT ALL PROJECT SIGNAGE | | | SHALL COMPLY WITH SEC. 94-110, OF THE ZONING AND LAND | | | DEVELOPMENT REGULATIONS (ZLDRS) WILL BE REQUIRED IN THE | | | PLANS. | | | | | | | | | INSTRUCTIONS FOR RESUBMITTAL: | | | | | | * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN | | | WRITTEN FORMAT. | | | | | | * WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF FOUR | | | (4) PAPER COPIES, ONE REDUCED COPY IN 11 INCHES X 17 | | | INCHES, AND AN ELECTRONIC COPY OF ALL PLANS AND | | | DOCUMENTS. | | | | | | *ANY CHANGES ON THE RESUBMITTED PLANS MAY RESULT IN | | | ADDITIONAL COMMENTS. | | | | | | * PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20 PERCENT OF THE ORIGINAL APPLICATION FEE | | | ($500.00). | | | | | | * CONTACT LINDA LOUIE @@ (561) 822-1458 IF THERE ARE | | | QUESTIONS. | | | |
|
|
| |
Print |
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |