| Plan Review Stops For Project Z22040016 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
05-11-2022 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
05-11-2022 |
Time |
20:32 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
05-11-2022 |
Time |
20:32 |
Sent To |
|
|
| Notes |
| 2022-05-11 20:33:00 | NO COMMENTS ON THE PROPOSED CHANGE IN ZONING | | | DESIGNATION. |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
05-09-2022 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
05-09-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
05-09-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-05-09 11:45:11 | NO COMMENTS FROM RICK ROSSANO, SR. PROJECT COORDINATOR, | | | ENGINEERING SERVICES AT 561-494-1098 [email protected] | | | | | | -SURVEY NOTE 1 SAYS THERE MAY BE ADDITIONAL EASEMENTS | | | AND LAND RESTRICTIONS. WHEN WILL THAT BE VERIFIED? | | | -ARE THERE ANY ACCESS OR PARKING AGREEMENTS IN PLACE | | | FOR THE PROPERTY ADJACENT TO THE WESTERN SIDE OF | | | PROPERTY (297 27TH ST)? | | | RESPECTFULLY, | | | MARK HURLEY | | | FIELD CUSTOMER SERVICE SUPERVISOR | | | CITY OF WEST PALM BEACH PUBLIC UTILITIES | | | 561-822-2262 | | | | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
05-04-2022 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
05-04-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
05-04-2022 |
Time |
13:06 |
Sent To |
|
|
| Notes |
| 2022-05-04 13:11:06 | FIRE HAS NO OBJECTIONS TO THE PROPOSED AND APPROVES. | | | | | | FIRE'S APPROVAL OF THIS SUBMITTED PROJECT MAY NOT | | | CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | IF APPLICABLE, FIRE SHALL REVIEW ALL SUBMITTED PROJECT | | | PLANS AT THE APPLICABLE TIME AND IN ACCORDANCE WITH THE | | | REQUIREMENTS OF ALL APPLICABLE FIRE CODES AND | | | STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
P |
Date |
05-09-2022 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
05-09-2022 |
Time |
14:34 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
05-09-2022 |
Time |
14:34 |
Sent To |
|
|
| Notes |
| 2022-05-09 14:36:34 | NO COMMENTS AT THIS TIME, WHEN A FUTURE SITE PLAN IS | | | SUBMITTED IT WILL BE REVIEWED FOR COMPLIANCE WITH THE | | | LANDSCAPE CODE. |
|
|
| Review Stop |
PU |
PUBLIC UTILITIES |
| Rev No |
1 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
mtechnow |
Date |
05-11-2022 |
Time |
15:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
P |
Date |
05-12-2022 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
05-12-2022 |
Time |
13:14 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
05-12-2022 |
Time |
13:14 |
Sent To |
|
|
| Notes |
| 2022-05-12 13:14:35 | 1. A PORTION OF THE SITE IS SITUATED IN A SPECIAL FLOOD | | | HAZARD AREA. CURRENTLY A MINIMUM TWO FEET OF FREEBOARD | | | IS REQUIRED ABOVE THE BASE FLOOD ELEVATION. | | | | | | 2. ALL DEVELOPMENT TO BE DESIGNED TO MEET SFWMD ERP | | | CRITERIA. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
P |
Date |
05-11-2022 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
05-11-2022 |
Time |
07:14 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-05-11 07:16:05 | PASSED FOR ZONING CHANGE, BUT NOTE THAT SURVEY WILL | | | REQUIRE A TITLE SEARCH AND COPY OF AGREEMENT FOR CROSS | | | ACCESS, PARKING, ETC. AT FUTURE SUBMITTAL. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
05-10-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
05-10-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-05-10 11:27:35 | 1) PROVIDE AN ANALYSIS SHOWCASING CURRENT AND MAX | | | ALLOWED TRIP GENERATION, REQUIRED AND PROVIDED PARKING, | | | ACCESS DRIVEWAY LOCATIONS AND VOLUMES | | | 2) REPEAT THE ANALYSIS ASSUMING CHANGE OF ZONING | | | DESIGNATION AND MAXIMUM DEVELOPMENT | | | | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
05-06-2022 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
05-06-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
05-06-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-05-06 14:28:10 | ZONING PASS STATUS IS FOR THE REZONING APPLICATION | | | CONTENT COMPLETION REVIEW - THIS HAS BEEN DEEMED | | | SUFFICENT AND CAN MOVE FORWARD THROUGH THE APPLICATION | | | PROCESS. | | | | | | HOWEVER, IT SHOULD BE NOTED THAT STAFF HAS CONCERNS | | | WITH THE REQUESTED REZONING OF THE SUBJECT PROPERTY | | | FROM CMUD-EDGE TO CMUD-TRANSITION AND THE | | | APPROPRIATENESS OF THE REZONING WITH THE LAND | | | USE/ZONING PATTERN OF THE IMMEDIATE AREA. STAFF HAD | | | EXPRESSED THESE CONCERNS TO THE APPLICANT DURING THE | | | PROCESS OF THE CMUD REGULATIONS AMENDMENT IN 2021. | | | | | | | | | NOTES: | | | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | | QUESTIONS. | | | | | | | | | |
|
|
| |
Print |