Plan Review Details - Project Z22040015
Plan Review Stops For Project Z22040015
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 05-11-2022 Cont ID  
Sent By rbrown Date 05-11-2022 Time 19:21 Rev Time 0.00
Received By rbrown Date 05-11-2022 Time 19:21 Sent To  
Notes
2022-05-11 19:22:29NO COMMENTS ON THE PROPOSED FUTURE LAND USE MAP
 AMENDMENT.

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 2 Status P Date 07-18-2023 Cont ID  
Sent By lquinone Date 07-18-2023 Time 08:57 Rev Time 0.00
Received By lquinone Date 07-18-2023 Time 08:57 Sent To  
Notes
***NONE***

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status F Date 05-09-2022 Cont ID  
Sent By rrossano Date 05-09-2022 Time   Rev Time 0.00
Received By rrossano Date 05-09-2022 Time   Sent To  
Notes
2022-05-09 11:55:58NO COMMENTS FROM RICK ROSSANO, SR. PROJECT COORDINATOR,
 ENGINEERING SERVICES AT 561-494-1098 [email protected]
  
 MARK HURLEY ? FIELD CUSTOMER SERVICE SUPERVISOR, CITY
 OF WPB PUBLIC UTILITIES, 561-822-2262, [email protected]
 -IN 319 BELVEDERE ANALYSIS LETTER, FIGURE 1 SEEMS TO
 SHOW 310 BELVEDERE RD PROPERTY.
 -SURVEY NOTE 2 SAYS NO SEARCH OF PUBLIC RECORD WAS
 MADE. WILL A SEARCH BE CONDUCTED?
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 05-04-2022 Cont ID  
Sent By pleduc Date 05-04-2022 Time   Rev Time 0.00
Received By pleduc Date 05-04-2022 Time 11:49 Sent To  
Notes
2022-05-04 11:52:22FIRE HAS NO OBJECTIONS TO THE PROPOSED AND APPROVES.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop L LANDSCAPING
Rev No 1 Status P Date 05-09-2022 Cont ID  
Sent By rcaranci Date 05-09-2022 Time 11:49 Rev Time 0.00
Received By rcaranci Date 05-09-2022 Time 11:49 Sent To  
Notes
2022-05-09 11:50:05NO COMMENTS AT THIS TIME
  
 RAY CARANCI, SENIOR LANDSCSAPE PLANNER
 561-822-1462

Review Stop PU-CS PUBLIC UTILITIES CUSTOMER SRVC
Rev No 1 Status P Date 07-05-2023 Cont ID  
Sent By mhurley Date 07-05-2023 Time 12:56 Rev Time 0.00
Received By mhurley Date   Time   Sent To  
Notes
***NONE***

Review Stop STORM STORMWATER
Rev No 1 Status P Date 05-12-2022 Cont ID  
Sent By tward Date 05-12-2022 Time 12:52 Rev Time 0.00
Received By tward Date 05-12-2022 Time 12:53 Sent To  
Notes
***NONE***

Review Stop SURVEY SURVEYING
Rev No 2 Status P Date 07-18-2023 Cont ID  
Sent By vnoel Date 07-18-2023 Time 13:22 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
***NONE***

Review Stop SURVEY SURVEYING
Rev No 1 Status F Date 05-10-2022 Cont ID  
Sent By vnoel Date 05-10-2022 Time 09:27 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
2022-05-10 09:26:581. SURVEY NOT SIGNED AND SEALED AND OUT OF DATE.

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 2 Status P Date 07-13-2023 Cont ID  
Sent By   Date 07-13-2023 Time   Rev Time 0.00
Received By   Date 07-13-2023 Time   Sent To  
Notes
2023-07-13 18:41:471) TO BE SATISFIED AT SITE PLAN SUBMISSION. PROVIDE A
 COMPREHENSIVE PARKING ANALYSIS. THE CITY HAS RECEIVED
 SEVERAL COMPLAINTS FROM RESIDENTS PERTAINING
 OVERPARKING OF EMPLOYEES AND CUSTOMERS ALONG
 NEIGHBORING STREETS
 2) TO BE SATISFIED AT SITE PLAN SUBMISSION. IN THE
 ANALYSIS, ALSO PROVIDE DETAILS OF CURRENT AND PLANNED
 LOADING ZONE(S) LOCATION AND OPERATION
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status F Date 05-06-2022 Cont ID  
Sent By   Date 05-06-2022 Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
2022-05-06 14:46:141) PROVIDE A COMPREHENSIVE PARKING ANALYSIS. THE CITY
 HAS RECEIVED SEVERAL COMPLAINTS FROM RESIDENTS
 PERTAINING OVERPARKING OF EMPLOYEES AND CUSTOMERS ALONG
 NEIGHBORING STREETS
 2) IN THE ANALYSIS, ALSO PROVIDE DETAILS OF CURRENT AND
 PLANNED LOADING ZONE(S) LOCATION AND OPERATION
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop Z ZONING
Rev No 2 Status F Date 07-10-2023 Cont ID  
Sent By llouie Date 07-10-2023 Time   Rev Time 0.00
Received By llouie Date 07-10-2023 Time   Sent To  
Notes
2023-07-10 16:43:02GENERAL COMMENTS:
  
 1. SATISFIED - THE APPLICANT IS REQUESTING TO INCREASE
 THE DEVELOPMENT POTENTIAL ON THE SUBJECT PROPERTY FROM
 0.75 TO 1.5 F.A.R. HAS THERE BEEN ANY PUBLIC OUTREACH
 WITHIN THE NEIGHBORHOOD? IT IS ADVISED THAT THE
 APPLICANT REACH OUT TO THE NEIGHBORING
 PROPERTIES/NEIGHBORHOOD ASSOCIATION(S) FOR PUBLIC INPUT
 ON THE PROPOSAL.
  
 1.1. PER THE 06.13.2023 RESPONSE LETTER TO PPRC'S
 COMMENTS, THE APPLICANT HAS MADE SIGNIFICANT OUTREACH
 EFFORTS TO KEEP EVERYONE IN THE NEIGHBORHOOD INFORMED
 ABOUT THE PLAN WITH THE SUBJECT PROPERTY.
  
 2. SATISFIED - UPDATED SIGNED AND SEALED SURVEY IS
 REQUIRED. SURVEY PROVIDED IS NOT SIGNED AND SEALED AND
 IT IS OVER 2 YEARS OLD. THE PROVIDED SURVEY IS NOT
 ACCEPTABLE. PLEASE REFER TO PAGE 5 OF THE 2022
 DEVELOPMENT APPLICATION FOR THE MINIMUM REQUIREMENTS ON
 THE SURVEY.
  
 3. SATISFIED - WHAT IS THE PURPOSE FOR THE PROPOSED
 FUTURE LAND USE (FLU) MAP AMENDMENT FROM COMMERCIAL (C)
 TO COMMERCIAL EAST (CE)? IS THERE A CONCEPTUAL PLAN
 AND/OR MASSING STUDY FOR THE SITE? DOES THE
 CONCEPTUAL/MASSING PLAN FIT WITH THE PROPOSED FLU
 CHANGE TO CE AND THE CONTEXT OF THE SURROUNDING AREA?
 CAN THE CONCEPTUAL PLAN MEET THE MINIMUM REQUIREMENTS
 OF THE ZONING AND LAND DEVELOPMENT REGULATIONS (ZLDRS)?
 ASIDE FROM THE CONTEXT OF THE SURROUNDING AREA, THE
 APPLICANT MUST BE ABLE TO PROVIDE MORE INFORMATION AND
 JUSTIFY WHY THE CE FLU IS DESIRED AND APPROPRIATE FOR
 THE SITE AND SURROUNDING AREA (I.E. THERE HAS TO BE A
 PURPOSE FOR THE FLUMA). A CONCEPTUAL SITE PLAN AND
 MASSING STUDY DEMONSTRATING THAT THE DESIGN/MAXIMUM
 MASSING OF THE OF THE SUBJECT PROPERTY CAN BE
 ACCOMMODATED AND FITS WITH THE CHARACTER AND CONTEXT OF
 THE SURROUNDING AREA WITH THE PROPOSED FLUMA SHOULD BE
 SUBMITTED TO SUPPLEMENT THE APPLICATION. THIS IS
 CRITICAL INFORMATION FOR STAFF TO ANALYZE IN
 DETERMINING IF THE FLUMA SHOULD BE SUPPORTED.
  
 3.1. A CONCEPTUAL MASSING PLAN HAS BEEN PROVIDED IN THE
 06.13.2023 RESUBMITTAL PACKET ILLUSTRATING THE PROPOSED
 MASSING BASED ON THE CE FLU STANDARDS.
  
 4. SATISFIED - THE SUBJECT PROPERTY APPEARS TO HAVE A
 SPLIT FLU DESIGNATION OF CE AND C. THROUGH DATA AND
 ANALYSIS, THE APPLICANT MUST BE ABLE TO IDENTIFY HOW
 MUCH OF THE OVERALL 1.0-ACRE SUBJECT SITE (IN
 ACRES/SQUARE FEET) IS PROPOSED FOR THE FLU CHANGE TO
 CE. ONLY THE PORTION OF THE SITE THAT IS SUBJECT TO THE
 FLU MAP AMENDMENT WILL BE UTILIZED TO DETERMINE THE
 MAXIMUM DEVELOPMENT POTENTIAL AND ANALYZED FOR
 LEVEL-OF- SERVICE (LOS).
  
 5. SATSIFIED - IN THE LOS ANALYSIS, THE MAXIMUM
 DEVELOPMENT POTENTIAL STATES THAT THE ACREAGE FOR THE
 AMENDMENT IS 0.627 ACRES. THERE IS NO
 EXPLANATION/BACK-UP INFORMATION/DOCUMENTATION TO WHERE
 THIS NUMBER CAME FROM (I.E. IT IS NOT MENTIONED IN THE
 JUSTIFICATION STATEMENT, NO SURVEY/ANALYSIS TO SHOW WHY
 THE 0.627 ACRES IS USED IN THE ANALYSIS FOR THE MAXIMUM
 DEVELOPMENT POTENTIAL, ETC.). PLEASE CLARIFY IN THE
 APPLICATION.
  
 6. SATISFIED - THE LOS CALCULATIONS/ANALYSIS IS BASED
 ON THE MOST INTENSIVE USE AND MOST INTENSIVE IMPACT
 (BASED ON THE MOST INTENSIVE USE) TO THE VARIOUS PUBLIC
 FACILITIES (I.E. IT COULD BE EITHER COMMERCIAL OR
 RESIDENTIAL). THE LOS ANALYSIS SHALL BE REVISED TO: A)
 CALCULATIONS MUST BE BASED ON THE MAXIMUM DEVELOPMENT
 POTENTIAL FOR ONLY THE AREA SUBJECT TO THE FLUMA. CHECK
 THE CITY'S COMPREHENSIVE PLAN FOR THE MAXIMUM
 DENSITY/INTENSITY FOR THE CE FLU (32.27 DU/ACRE OR 1.5
 FAR). B) DATA AND LOS CALCULATIONS FOR EACH PUBLIC
 FACILITY MUST BE BASED ON THE MOST INTENSIVE USE/IMPACT
 GENERATED. C) FOR SANITARY SEWER: WHERE DID THE 0.20
 GPD STANDARD COME FROM? CONTACT THE ENGINEERING
 SERVICES DEPARTMENT FOR RATE THAT SHOULD BE USED. D)
 FOR POTABLE WATER: WHERE DID THE 0.24 GPD STANDARD COME
 FROM? CONTACT THE ENGINEERING SERVICES DEPARTMENT FOR A
 RATE THAT SHOULD BE USED. E) FIGURE 1 PROVIDED IN THE
 LOS ANALYSIS DEPICTS THE WRONG PARCEL (I.E. IT IS NOT
 THE PARCEL LOCATED AT 319 BELVEDERE ROAD). PLEASE
 ADDRESS FOR CONSISTENCY. F) WHERE DID THE INFORMATION
 FROM ATTACHMENTS 1 AND 2 COME FROM? THE ANALYSIS DOES
 NOT REFERENCE WHERE THIS INFORMATION CAME FROM. G) THE
 LOS ANALYSIS SUMMARY TABLE AND SUMMARIES WILL NEED TO
 BE REVISED BASED ON THE CORRECTED INFORMATION.
  
 7. PARTIALLY SATISFIED - THE PROPOSED FLU CHANGE IS
 EXPECTED TO INCREASE THE DEMAND ON PUBLIC FACILITIES.
 ANY INCREASE IN DEMAND ON ANY OF THE PUBLIC FACILITIES
 AS A RESULT OF THE PROPOSED FLU CHANGE SHALL ALSO
 PROVIDE WRITTEN CONFIRMATION FROM THE APPLICABLE
 SERVICE AGENCY INDICATING THAT SUFFICIENT
 CAPACITY/RESERVE CAPACITY EXISTS TO ACCOMMODATE THE
 BUILD-OUT OF THE PROPOSED FLU DESIGNATION.
 CERTIFICATION LETTERS WILL BE REQUIRED FOR THE
 FOLLOWING: DRAINAGE, WATER, WASTEWATER (SEWER) SOLID
 WASTE, SCHOOLS AND TRAFFIC. PLEASE NOTE THAT A GENERAL
 STATEMENT STATING THAT THE CITY HAS SUFFICIENT CAPACITY
 AVAILABLE FOR THE FLUMA IS INSUFFICIENT (AS NOT ALL
 SERVICES ARE PROVIDED BY THE CITY AND CAPACITY MUST BE
 VERIFIED BY THE VARIOUS SERVICE PROVIDERS.).
  
 7.1. CERTIFICATION LETTERS STILL OUTSTANING FOR:
 POTABLE WATER, SANITARY SEWER AND DRAINAGE.
  
 7.2. SCAD FLUMA LETTER REFLECTS 32 RESIDENTIAL UNITS.
 WHERE DID THIS NUMBER COME FROM? SCAD LETTER SHOULD
 REFLECT MAXIMUM DEVELOPMENT POTENTIAL ONLY (20 UNITS).
  
 8. SATISFIED - THE JUSTIFICATION STATEMENT MUST BE
 CLEAR ON THE REQUEST. PLEASE REVISE THE JUSTIFICATION
 STATEMENT TO SPECIFY/EXPAND ON THE RELATED BACKGROUND
 INFORMATION ON THE PROJECT SITE; JUSTIFICATION, SPECIAL
 REASONS, OR BASIS FOR THE REQUEST; VISION/CONCEPTUAL
 PROPOSED FOR THE SUBJECT SITE AND MASSING STUDY; AMOUNT
 OF AREA OF THE OVERALL PARCEL SUBJECT TO THE FLUMA,
 ETC.
  
  
 INSTRUCTIONS FOR RESUBMITTAL:
  
 * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 * WHEN RESUBMITTING, PLEASE PROVIDE TWO (2) PAPER
 COPIES AND AN ELECTRONIC COPY OF ALL PLANS/DOCUMENTS IN
 THE RESUBMITTAL. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS MAY RESULT IN ADDITIONAL COMMENTS.
  
 * YOU WILL BE PERMITTED ONE (1) RESUBMITTAL AT NO
 ADDITIONAL COST. IF PREVIOUSLY-ISSUED COMMENTS CONTINUE
 TO NOT BE SUFFICIENTLY ADDRESSED, THE APPLICANT WILL BE
 ASSESSED A RESUBMITTAL FEE. SUCH FEE WILL BE 20 PERCENT
 OF THE ORIGINAL APPLICATION FEE ($600.00).
  
 CONTACT LINDA LOUIE @ 561.822.1458 OR [email protected] IF
 THERE ARE ANY QUESTIONS.
  

Review Stop Z ZONING
Rev No 1 Status F Date 05-05-2022 Cont ID  
Sent By llouie Date 05-05-2022 Time   Rev Time 0.00
Received By llouie Date 05-05-2022 Time   Sent To  
Notes
2022-05-05 16:37:35GENERAL COMMENTS:
  
 1.) THE APPLICANT IS REQUESTING TO INCREASE THE
 DEVELOPMENT POTENTIAL ON THE SUBJECT PROPERTY FROM 0.75
 TO 1.5 F.A.R.. HAS THERE BEEN ANY PUBLIC OUTREACH
 WITHIN THE NEIGHBORHOOD? IT IS ADVISED THAT THE
 APPLICANT REACH OUT TO THE NEIGHBORING
 PROPERTIES/NEIGHBORHOOD ASSOCIATION(S) FOR PUBLIC INPUT
 ON THE PROPOSAL.
  
 2.) UPDATED SIGNED AND SEALED SURVEY IS REQUIRED.
 SURVEY PROVIDED IS NOT SIGNED AND SEALED AND IT IS OVER
 2 YEARS OLD. THE PROVIDED SURVEY IS NOT ACCEPTABLE.
 PLEASE REFER TO PAGE 5 OF THE 2022 DEVELOPMENT
 APPLICATION FOR THE MINIMUM REQUIREMENTS ON THE SURVEY.
  
 3.) WHAT IS THE PURPOSE FOR THE PROPOSED FUTURE LAND
 USE (FLU) MAP AMENDMENT FROM COMMERCIAL (C) TO
 COMMERCIAL EAST (CE)? IS THERE A CONCEPTUAL PLAN AND/OR
 MASSING STUDY FOR THE SITE? DOES THE CONCEPTUAL/MASSING
 PLAN FIT WITH THE PROPOSED FLU CHANGE TO CE AND THE
 CONTEXT OF THE SURROUNDING AREA? CAN THE CONCEPTUAL
 PLAN MEET THE MINIMUM REQUIREMENTS OF THE ZONING AND
 LAND DEVELOPMENT REGULATIONS (ZLDRS)? ASIDE FROM THE
 CONTEXT OF THE SURROUNDING AREA, THE APPLICANT MUST BE
 ABLE TO PROVIDE MORE INFORMATION AND JUSTIFY WHY THE CE
 FLU IS DESIRED AND APPROPRIATE FOR THE SITE AND
 SURROUNDING AREA (I.E. THERE HAS TO BE A PURPOSE FOR
 THE FLUMA). A CONCEPTUAL SITE PLAN AND MASSING STUDY
 DEMONSTRATING THAT THE DESIGN/MAXIMUM MASSING OF THE OF
 THE SUBJECT PROPERTY CAN BE ACCOMMODATED AND FITS WITH
 THE CHARACTER AND CONTEXT OF THE SURROUNDING AREA WITH
 THE PROPOSED FLUMA SHOULD BE SUBMITTED TO SUPPLEMENT
 THE APPLICATION. THIS IS CRITICAL INFORMATION FOR STAFF
 TO ANALYZE IN DETERMINING IF THE FLUMA SHOULD BE
 SUPPORTED.
  
 4.) THE SUBJECT PROPERTY APPEARS TO HAVE A SPLIT FLU
 DESIGNATION OF CE AND C. THROUGH DATA AND ANALYSIS, THE
 APPLICANT MUST BE ABLE TO IDENTIFY HOW MUCH OF THE
 OVERALL 1.0-ACRE SUBJECT SITE (IN ACRES/SQUARE FEET) IS
 PROPOSED FOR THE FLU CHANGE TO CE. ONLY THE PORTION OF
 THE SITE THAT IS SUBJECT TO THE FLU MAP AMENDMENT WILL
 BE UTILIZED TO DETERMINE THE MAXIMUM DEVELOPMENT
 POTENTIAL AND ANALYZED FOR LEVEL-OF- SERVICE (LOS).
  
 5.) IN THE LOS ANALYSIS, THE MAXIMUM DEVELOPMENT
 POTENTIAL STATES THAT THE ACREAGE IS 0.6-ACRE. THERE IS
 NO EXPLANATION/BACK-UP INFORMATION/DOCUMENTATION TO
 WHERE THIS NUMBER CAME FROM (I.E. IT IS NOT MENTIONED
 IN THE JUSTIFICATION STATEMENT, NO SURVEY/ANALYSIS TO
 SHOW WHY 0.6-ACRE IS USED IN THE ANALYSIS FOR THE
 MAXIMUM DEVELOPMENT POTENTIAL, ETC.). PLEASE CLARIFY IN
 THE APPLICATION.
  
 6.) THE LOS CALCULATIONS/ANALYSIS IS BASED ON THE MOST
 INTENSIVE USE AND MOST INTENSIVE IMPACT (BASED ON THE
 MOST INTENSIVE USE) TO THE VARIOUS PUBLIC FACILITIES
 (I.E. IT COULD BE EITHER COMMERCIAL OR RESIDENTIAL).
 THE LOS ANALYSIS SHALL BE REVISED TO: A) CALCULATIONS
 MUST BE BASED ON THE MAXIMUM DEVELOPMENT POTENTIAL FOR
 ONLY THE AREA SUBJECT TO THE FLUMA. CHECK THE CITY'S
 COMPREHENSIVE PLAN FOR THE MAXIMUM DENSITY/INTENSITY
 FOR THE CE FLU (32.27 DU/ACRE OR 1.5 FAR). B) DATA AND
 LOS CALCULATIONS FOR EACH PUBLIC FACILITY MUST BE BASED
 ON THE MOST INTENSIVE USE/IMPACT GENERATED. C) FOR
 SANITARY SEWER: WHERE DID THE 0.20 GPD STANDARD COME
 FROM? CONTACT THE ENGINEERING SERVICES DEPARTMENT FOR
 RATE THAT SHOULD BE USED. D) FOR POTABLE WATER: WHERE
 DID THE 0.24 GPD STANDARD COME FROM? CONTACT THE
 ENGINEERING SERVICES DEPARTMENT FOR A RATE THAT SHOULD
 BE USED. E) FIGURE 1 PROVIDED IN THE LOS ANALYSIS
 DEPICTS THE WRONG PARCEL (I.E. IT IS NOT THE PARCEL
 LOCATED AT 319 BELVEDERE ROAD). PLEASE ADDRESS FOR
 CONSISTENCY. F) WHERE DID THE INFORMATION FROM
 ATTACHMENTS 1 AND 2 COME FROM? THE ANALYSIS DOES NOT
 REFERENCE WHERE THIS INFORMATION CAME FROM. G) THE LOS
 ANALYSIS SUMMARY TABLE AND SUMMARIES WILL NEED TO BE
 REVISED BASED ON THE CORRECTED INFORMATION.
  
 7.) THE PROPOSED FLU CHANGE IS EXPECTED TO INCREASE THE
 DEMAND ON PUBLIC FACILITIES. ANY INCREASE IN DEMAND ON
 ANY OF THE PUBLIC FACILITIES AS A RESULT OF THE
 PROPOSED FLU CHANGE SHALL ALSO PROVIDE WRITTEN
 CONFIRMATION FROM THE APPLICABLE SERVICE AGENCY
 INDICATING THAT SUFFICIENT CAPACITY/RESERVE CAPACITY
 EXISTS TO ACCOMMODATE THE BUILD-OUT OF THE PROPOSED FLU
 DESIGNATION. CERTIFICATION LETTERS WILL BE REQUIRED FOR
 THE FOLLOWING: DRAINAGE, WATER, WASTEWATER (SEWER)
 SOLID WASTE, SCHOOLS AND TRAFFIC. PLEASE NOTE THAT A
 GENERAL STATEMENT STATING THAT THE CITY HAS SUFFICIENT
 CAPACITY AVAILABLE FOR THE FLUMA IS INSUFFICIENT (AS
 NOT ALL SERVICES ARE PROVIDED BY THE CITY AND CAPACITY
 MUST BE VERIFIED BY THE VARIOUS SERVICE PROVIDERS.).
  
 8.) THE JUSTIFICATION STATEMENT MUST BE CLEAR ON THE
 REQUEST. PLEASE REVISE THE JUSTIFICATION STATEMENT TO
 SPECIFY/EXPAND ON THE RELATED BACKGROUND INFORMATION ON
 THE PROJECT SITE; JUSTIFICATION, SPECIAL REASONS, OR
 BASIS FOR THE REQUEST; VISION/CONCEPTUAL PROPOSED FOR
 THE SUBJECT SITE AND MASSING STUDY; AMOUNT OF AREA OF
 THE OVERALL PARCEL SUBJECT TO THE FLUMA, ETC.
  
  
  
 INSTRUCTIONS FOR RESUBMITTAL:
  
 * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 * WHEN RESUBMITTING, PLEASE PROVIDE TWO (2) PAPER
 COPIES AND AN ELECTRONIC COPY OF ALL PLANS/DOCUMENTS IN
 THE RESUBMITTAL. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS MAY RESULT IN ADDITIONAL COMMENTS.
  
 * YOU WILL BE PERMITTED ONE (1) RESUBMITTAL AT NO
 ADDITIONAL COST. IF PREVIOUSLY-ISSUED COMMENTS CONTINUE
 TO NOT BE SUFFICIENTLY ADDRESSED, THE APPLICANT WILL BE
 ASSESSED A RESUBMITTAL FEE. SUCH FEE WILL BE 20 PERCENT
 OF THE ORIGINAL APPLICATION FEE ($600.00).
  