| 2022-08-19 09:03:01 | PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN WRITTEN |
| | FORMAT. [ACKNOWLEDGED] |
| | |
| | THANK YOU FOR THE EXCEL DOCUMENT FOR THE RESPONSES, |
| | PLEASE PROVIDE DIRECT RESPONSES ON RESUBMITTALS WITHIN |
| | A WORD OR SIMILAR FORMAT. (DISPLAY THE QUESTION ASKED |
| | BY REVIEWERS AND THE ANSWER/RESPONSE FROM APPLICANTS) |
| | |
| | WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF THREE |
| | (3) PAPER COPIES AND AN ELECTRONIC COPY IN .PNG AND PDF |
| | FORMAT OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE |
| | RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS |
| | TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL |
| | COMMENT. [ACKNOWLEDGED] |
| | |
| | THE PPRC COMMENTS SHALL BE SUFFICIENTLY ADDRESSED AND |
| | SUBMITTED TO THE PLANNING DIVISION BY 5 PM ON FRIDAY |
| | 05/27 /22, TO BE ELIGIBLE TO BE SCHEDULED FOR THE |
| | 7/13/22 DOWNTOWN ACTION COMMITTEE MEETING. [COVID |
| | DELAYS NOT CAUSED BY APPLICANT] |
| | |
| | PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT |
| | RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS |
| | FROM THE DATE OF THE PPRC MEETING (BY AUGUST 12, 2022), |
| | THE PLANNING DIVISION MAY NOTIFY THE APPLICANT THAT THE |
| | CASE IS CONSIDERED WITHDRAWN. ANY FURTHER ACTION SHALL |
| | REQUIRE A NEW DEVELOPMENT APPLICATION. [ACKNOWLEDGED] |
| | |
| | PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) |
| | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY ISSUED |
| | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE |
| | APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE |
| | WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($500). |
| | [ACKNOWLEDGED] |
| | |
| | 1. THIS PROPOSED PROJECT IS SIGNIFICANTLY DIFFERENT |
| | THAN THE CURRENTLY APPROVED SITE PLAN; THEREFORE, IT IS |
| | NOT A MODIFICATION TO THE EXISTING APPROVED SITE PLAN |
| | AS STATED IN THE JUSTIFICATION STATEMENT, BUT RATHER A |
| | NEW SITE PLAN APPROVAL. THE PREVIOUSLY APPROVED SITE |
| | PLAN AND THE VARIANCES THAT WERE GRANTED DO NOT |
| | AUTOMATICALLY APPLY TO THE NEW SITE PLAN. ANY VARIANCES |
| | THAT ARE REQUIRED BASED ON THE NEW BUILDING DESIGN AND |
| | SITE LAYOUT REQUIRE APPROVAL BY THE DOWNTOWN ACTION |
| | COMMITTEE THROUGH THE VARIANCE PROCESS. [THE CURRENT |
| | SITE PLAN IS APPROVED AND VESTED BY MULTIPLE APPROVALS |
| | PROVIDED BY WPB AND PBC PURSUANT TO THE PSA. THESE |
| | VESTED ITC AND GROUND LEVEL FEATURES THAT ARE OR CAN BE |
| | LEGALLY BUILT TODAY ARE INTENDED TO BE CARRIED FORWARD |
| | IN THE NEW APPROVAL AND WE HAVE BEEN ASSURED BY |
| | ADMINISTRATION THAT THE CITY WILL RECOGNIZE THESE |
| | VESTED FEATURE AND WILL BE WORKING WITH THE APPLICANT |
| | TO CARRY THEM FORWARD IN THE NEW SITE PLAN APPROVAL |
| | BEING SOUGHT THAT WILL EVENTUALLY REPLACE AND SUPERSEDE |
| | HE EXISTING VESTED APPROVAL WITH A NEW APPROVAL THAT |
| | REAFFIRMS THESE PREVIOUSLY APPROVED SITE CONDITIONS.] |
| | PLEASE NOTE, THERE ARE NO VESTED OR CARRIED OVER |
| | APPROVALS FOR THIS PROJECT, BEYOND THE ORIENTATION OF |
| | THE ITC/SFRTA FACILITIES, THE BUS/TRAIN OPERATIONS, AND |
| | THE REQUIREMENTS WITHIN THE COUNTY PSA FOR RESERVED ITC |
| | AND SFRTA PARKING SPACES. THE REST OF SITE, PROPOSED |
| | STRUCTURES, CIRCULATION, ETC. WILL BE REVIEWED AND |
| | TREATED AS A NEW SITE PLAN SUBMITTAL. ANY PREVIOUSLY |
| | OBTAINED VARIANCES, WAIVERS, AND APPROVALS FROM |
| | DAC/STAFF MUST BE REACQUIRED/ APPLIED FOR, AS THE |
| | OVERALL SITE CONDITIONS AND PLANS HAVE CHANGED |
| | SIGNIFICANTLY FROM THE PREVIOUSLY APPROVED PLANS FOR |
| | THIS PROPERTY. |
| | |
| | TV JULY 19TH RESPONSE: TV HAS AGREED TO PROCEED TO |
| | RESPONSIVELY RESPOND TO THESE PPRC COMMENTS WITHOUT |
| | WAIVING ANY RIGHTS THAT IT MAY HAVE. |
| | ZONING 8.19 - [ACKNOWLEDGED] |
| | |
| | 2. STAFF HAS NOTED THAT THE PROPOSED SITE PLAN, |
| | INCLUDING THE USE MIX, DIFFERS FROM THE AGREEMENT FOR |
| | PURCHASE AND SALE DATED AUGUST 12, 2012. SINCE THE |
| | AGREEMENT FOR PURCHASE AND SALE ESTABLISHES THAT |
| | MODIFICATIONS ARE PERMITTED, SUBJECT TO PALM BEACH |
| | COUNTY APPROVAL, PLEASE PROVIDE THE LATEST AMENDMENT OR |
| | VERSION OF THE AGREEMENT FOR PURCHASE AND SALE THAT |
| | AUTHORIZES THE CHANGES PRESENTED IN THE CURRENT |
| | SUBMITTAL, INCLUDING, BUT NOT LIMITED TO: [COPIES OF |
| | THE PSA AND ALL AMENDMENT PROVIDED. A COPY OF PBC |
| | WRITTEN CONSENT TO THE SUBMITTED PLAN PACKAGE WAS |
| | PROVIDED PURSUANT TO THE PSA AND COPIES OF ALL |
| | AGREEMENTS HAVE ALSO BEEN PROVIDED] [SATISFIED] THANK |
| | YOU FOR PROVIDING PSA DOCUMENTATION AND ADDITIONAL |
| | AMENDMENTS/ AGREEMENTS. |
| | |
| | A. THE REDUCTION IN THE REQUIRED 40 PARKING SPACES FOR |
| | SFTRA / COUNTY STAFF AND 250 SFRTA PATRON PARKING |
| | SPACES TOTAL 290 PARKING SPACES) TO 275 PARKING SPACES |
| | FOR THESE USERS. |
| | [THIS STATEMENT IS INCORRECT. THE MODIFIED PSA REQUIRES |
| | 25 SPACES TO THE COUNTY WHICH IS WHAT IS PROVIDED] |
| | [SATISFIED] THANK YOU FOR PROVIDING THE NECESSARY PSA |
| | DOCUMENTATION WITH AMENDMENTS. THE LATEST AMENDMENT TO |
| | PSA (EXHIBIT 2) THAT WAS PROVIDED WITH RESUBMITIAL |
| | STATES: 250 PARKING SPACES FOR TRI-RAIL, AND 25 SPACES |
| | FPOR THE COUNTY |
| | |
| | B. THE REMOVAL OF LEARNING CENTER/CULTURAL/EDUCATION |
| | USES FROM THE PROJECT. [THIS USE WAS VOLUNTARY AND IS |
| | NOT A REQUIREMENT OF ANY APPROVAL] [NOT SATISFIED] |
| | SECTION 2.3.2 OF PSA (PG.14) STATES: |
| | THE SITE PLAN WILL INCLUDE, BUT NOT BE LIMITED TO, |
| | CIVIC USE (LEARNING CENTER/CULTURAL CENTER/EDUCATION), |
| | COMMERCIAL/OFFICE, HOTEL ROOMS, RESIDENTIAL UNITS |
| | (STUDENT /WORKFORCE/MARKET) INCLUDING WORKFORCE AND/OR |
| | AFFORDABLE UNITS? LUXURY RENTAL UNITS AND AMENITY |
| | RETAIL. IT APPEARS TO BE A REQUIREMENT OF THE PSA, HAS |
| | THIS BEEN AMENDED? IF SO PLEASE PROVIDE SPECIFIC |
| | DOCUMENT OR OUTLINE LOCATION, SO STAFF CAN VERIFY. |
| | |
| | TV JULY 19TH RESPONSE: ALTHOUGH ANY ISSUE WITHIN THE |
| | PSA IS BETWEEN BUYER AND SELLER, THE TERMS OF THE PSA |
| | HAVE BEEN MET. THE PSA ALLOWS FOR A CHANGE IN USES AS |
| | DETERMINED BY TV (PLEASE SEE SPECIFICALLY SECTION 2.3.2 |
| | OF THE PSA). |
| | |
| | FURTHER, AMENDMENTS ARE ALSO PERMITTED IF APPROVED BY |
| | THE COUNTY DURING ITS SITE PLAN REVIEW PROCESS. |
| | |
| | IN FURTHERANCE OF THIS, THE AMENDED SITE PLAN THAT HAS |
| | BEEN APPROVED BY PALM BEACH COUNTY AND THEIR EXPLICIT |
| | CONSENT HAS BEEN PREVIOUSLY PROVIDED. |
| | |
| | NEVERTHELESS, TV WISHES TO POINT OUT THAT THE AMENDED |
| | SITE PLAN CONTINUES TO PROVIDE CIVIC USES INCLUDING, |
| | BUT NOT LIMITED TO, THE PLAZA AND CONNECTION FROM THE |
| | PROJECT TO THE TRI-RAIL CROSSOVER AND THE TRI-RAIL |
| | PARKING. |
| | |
| | SEE ATTACHED EMAIL (?MCCLELLAN EMAIL?) DATED JULY 13, |
| | 2022 FROM ERIC MCCLELLAN FROM THE COUNTY CONFIRMING |
| | TV?S COMPLIANCE WITH THE PSA AND SPECIFICALLY THE |
| | AMENDED SITE PLAN. |
| | [SATISFIED] |
| | |
| | C. THE JUSTIFICATION STATEMENT SITE DATA TABLE LISTS 42 |
| | WORKFORCE HOUSING UNITS AS BEING REQUIRED, WHILE THE |
| | AGREEMENT FOR PURCHASE AND SALE ONLY REQUIRES 38. THE |
| | PLANS DO NOT PROVIDE A BREAKDOWN TO VERIFY COMPLIANCE |
| | WITH EITHER NUMBER. [THE 42 WORKFORCE HOUSING UNITS |
| | REQUIRED BY THE PSA ARE SHOWN IN THE SITE PLAN TABULAR. |
| | THEIR FINAL LOCATION HAS NOT YET BEEN DETERMINED, |
| | HOWEVER THE APPLICANT INTENDS TO PROVIDE THEM IN A |
| | MANNER SO AS TO NOT CLUSTER OR CONCENTRATE THEM IN ANY |
| | ONE LOCATION. THE PSA REQUIRES THEM TO BE ON SITE AND |
| | COMPLY WITH THE COUNTY HOUSING PROGRAM. THE APPLICANT |
| | WILL CONTINUE TO WORK WITH WPB AND PBC ON THE TERMS OF |
| | THE WFH UNITS.] |
| | [PARTIALLY SATISFIED] THANK YOU FOR PROVIDING THE |
| | NECESSARY DOCUMENTATION FOR THE LATEST AMENDMENT TO PSA |
| | (5C-5). THIS SHEET (5C-5) INCLUDES ADDITIONAL (4) |
| | WORKFORCE UNITS. ?- DO NOT SEE THESE WFH UNITS CALLED |
| | OUT OR MENTIONED IN DATA TABLES OR SITE PLAN. |
| | |
| | TV JULY 19TH RESPONSE: 42 WFH UNITS REQUIRED BY PSA ARE |
| | SHOWN IN TABULAR FORMAT ON SHEET A0-02. THE LOCATION TO |
| | BE DETERMINED AT A LATER TIME. WE WILL PROVIDE EVIDENCE |
| | OF COMPLIANCE WITH THIS PROVISION WHEN PROVIDED TO THE |
| | COUNTY UNDER THE PSA. THIS IS NOT A CITY REQUIREMENT. |
| | |
| | SEE MCCLELLAN EMAIL. |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | D. SECTION 3E OF EXHIBIT D TRAFFIC CIRCULATION PLAN OF |
| | THE AGREEMENT FOR PURCHASE AND SALE LIMITS THE NUMBER |
| | OF PARKING SPACES WITHIN THE PARKING GARAGE TO THE 290 |
| | PUBLIC USE PARKING SPACES AND, PROVIDE NOT MORE THAN |
| | THE NUMBER OF PARKING SPACES REQUIRED BY THE CITY OF |
| | WEST PALM BEACH FOR THE MIX OF USES AND INTENSITIES / |
| | DENSITIES AS ACTUALLY CONSTRUCTED. AS WILL BE SHOWN |
| | LATER IN THESE COMMENTS, THE PROJECT EXCEEDS THIS |
| | STANDARD. [THESE SPACES ARE INTENDED TO SERVE THE |
| | TRANSIT USES REQUIRED TO BE PROVIDED TO THESES |
| | GOVERNMENTAL PROVIDERS. THESE PARKING SPACES ARE |
| | INCLUSIVE TO THE MINIMUM PARKING REQUIRED FOR THE |
| | PROJECT AND ARE NOT IN EXCESS OF THE MAXIMUM PARKING |
| | PERMITIED ON SITE. THE GARAGE COMPONENT IS BEING BUILT |
| | TO SERVE THE ENTIRE PROJECT AND THE PSA REQUIRES |
| | CONTINUOUS C[O]NSTRTUCTION OF THE PROJECT UNTIL IT IS |
| | COMPLETED.] [PARTIALLY STATISFIED] THANK YOU FOR |
| | PROVIDING THE NECESSARY DOCUMENTATION ON THE PSA AND |
| | ITS AMENDMENTS, IN ADDITION TO THE PARKING BREAKDOWN; |
| | BASED UPON THIS: THE HOTEL ROOM/ AMENITY, RESINDENTIAL, |
| | RETAIL, OFFICE, GUEST AND SFRTA / COUNTY PARK[G]ING |
| | SPACES CHECKOUT WITH THE REQUIRED MINIMUMS AND 25% TOD |
| | REDUCTION. |
| | |
| | - CLARIFICATION, TABLE IV-9: MICRO-UNITS MINIMUM |
| | PARKING REQUIREMENT IS ZERO, NOT 1/13 UNITS. ONLY |
| | CF.\R?SHARE HAS 1/13 REQUIREMENT. |
| | - PLEASE MAKE CLEAR FROM THE TABLE PROVIDED, ARE YOU |
| | PROVIDING. ONLY 13 CAR-SHARE SPACES FOR -MICRO-UNITS? |
| | OR ARE YOU ARE PROVIDING 13 SPACES FOR MICRO-UNITS AND |
| | THEN ADDITIONAL 13 CAR-SHARE SPACES (26 TOTAL)? THE |
| | CAR-SHARE SPACES WOULD BE INDEPENDENT FROM OTHER |
| | PARKING AND DESIGNATED/RESERVED AS SUCH. |
| | - PER SECTION 94-106 (8.A) A PROJECT WITH RESIDENTIAL |
| | MICRO-UNITS SHALL PROVIDE ON-SITE CAR-SHARE STATIONS ON |
| | A RATIO OF ONE PER EVERY 13 UNITS. THE TOTAL AMOUNT OF |
| | CAR-SHARE STATIONS MAY BE REDUCED BY ONE CAR-SHARE |
| | STATION PER EVERY 13 ON-SITE PARKING SPACES PROVIDED. |
| | THE TOTAL NUMBER OF CAR-SHARE STATIONS MAY BE ADJUSTED |
| | BASED ON CURRENT SYSTEM DEMANDS, BUT A MINIMUM OF ONE |
| | CAR-SHARE STATION SHALL BE PROVIDED. THE REMAINDER OF |
| | THE SPACES SHALL BE RESERVED FOR FUTURE SERVICE |
| | EXPANSION. |
| | |
| | TV JULY 19TH RESPONSE: MICRO UNITS ARE PROPOSED TO BE |
| | PARKED TO CODE WITH 0 SPACES PER UNIT, 13 SHARED CAR |
| | SPACES, AND 8 GUEST SPACES WITH 83 BIKE SPACES. TABULAR |
| | DATA ON SHEET A0-02 HAS BEEN UPDATED TO REFLECT THE |
| | PARKING RESERVATION FOR MICRO USES. |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | 3. THE SITE CURRENTLY CONSISTS OF A PBC PARCEL AND A |
| | SFTRA PARCEL. THANK YOU FOR PROVIDING AMENDMENT 3 AND |
| | 2021 EXTENSTION TO AUG 2024, WHICH MENTIONED THAT THE |
| | SFRTA BE UNDER CONDOMINIUM OWNERSHIP RATHER THAN |
| | SEPARATE SPACES TO BE A CONDOMINUM. THIS INDICATES THAT |
| | THE PROJECT WILL PARCELS. IF THE AGREEMENT IS AMENDED |
| | AND THERE WILL BE FEE SIMPLE PARCELS, THOSE PARCEL |
| | LINES NEED TO BE SHOWN / INDICATED NOW, SO THAT STAFF |
| | CAN VERIFY THAT THERE ARE NO BUILDING SEPARATATION OR |
| | SETBACK ISSUES THAT DO NOT COMPLY WITH BUILDING,ZONING, |
| | OR FIRE CODE, AND IF ANY VARIANCES ARE NEEDED AS PART |
| | OF THE APPROVAL. |
| | |
| | TV JULY 19TH RESPONSE: TV NOTES THAT THE PERFORMANCE OF |
| | THIS AGREEMENT BY SFRTA IS NOT BEFORE THE PHYSICAL |
| | COMPLETION OF THE SFRTA/TRI-RAIL PARKING SPACES AND |
| | THAT THE SFRTA AGREEMENT IS STILL PRINCIPALLY EXECUTORY |
| | AS IT HAS NOT BEEN FULLY PERFORMED BY THE SFRTA AT THIS |
| | TIME. |
| | |
| | TV?S HAS NO CURRENT INTENT TO HAVE SEPARATELY OWNED |
| | LAND PARCELS AND THAT AN EASEMENT OR OTHER |
| | AGREEMENT/INSTRUMENT WILL BE UTILIZED TO RESERVE THE |
| | SFRTA/TRI-RAIL PARKING. |
| | ZONING 8.19 - [ACKNOWLEDGED] |
| | E. THE DECKS, COLUMNS AND A PORTION OF THE RETAIL |
| | BUILDING ON THE SOUTH END OF THE SECOND FLOOR CROSS |
| | THIS PARCEL LINE, WHICH CREATE SETBACK AND BUILDING |
| | SEPARATION ISSUES THAT NEED TO BE ADDRESSED. |
| | [CONFIRMED] [NOT SATISFIED] SEE COMMENT ABOVE. |
| | |
| | TV JULY 19TH RESPONSE: THE GREEN/BLUE COLORS ON SHEET |
| | A0-03 WERE FIRST AGREED UPON IN 2012 IN CONNECTION WITH |
| | THE EXECUTION OF THE PSA AND WERE CONCEPTUAL AT THAT |
| | TIME AS TO THE FINAL PROPERTY LINES. ACCORDINGLY, THE |
| | PSA REQUIRES TV TO PREPARE THE METES AND BOUNDS OF THE |
| | TITLE TO BE CONVEYED AND PROVIDES FOR THE ADJUSTMENT OF |
| | THE PROPERTY LINES, IN ACCORDANCE WITH THE COUNTY?S |
| | APPROVAL OF THE AMENDED SITE PLAN. THE COUNTY HAS |
| | APPROVED THE AMENDED SITE PLAN AND TRANSIT VILLAGE WILL |
| | OBTAIN FEE SIMPLE TO THIS PROPERTY. SEE MCCLELLAN EMAIL |
| | . SEE ALSO SECTION 5.9 AND EXHIBIT A TO THE PSA WHICH |
| | PROVIDE FOR THE ADJUSTMENT OF THE PROPERTY LINES. |
| | ZONING 8.19 - [ACKNOWLEDGED] |
| | |
| | F. THE AGREEMENT FOR PURCHASE AND SALE INDICATES THAT |
| | PALM BEACH COUNTY WILL RETAIN OWNERSHIP OF THE |
| | INTERMODAL TRANSIT CENTER TO A POINT 21 FEET IN THE |
| | AIR. THE APPLICATION DOES NOT MENTION HOW THIS PROPOSED |
| | SUBDIVISION WILL OCCUR. [THESE PROPERTY LINES WILL BE |
| | ADDRESSED AS PART OF THE SUBDIVISION PROCESS OR BY |
| | AGREEMENT] |
| | [NOT SATISFIED] SEE COMMENTS ABOVE. |
| | |
| | TV JULY 19TH RESPONSE: THIS MAY BE ACHIEVED WITH A |
| | VERTICAL SUBDIVISION OR AN AIR RIGHT EASEMENT OR OTHER |
| | LEGAL INSTRUMENT TO BE DETERMINED LATER WITH |
| | COORDINATION WITH STAFF AND THE COUNTY. THERE IS NO |
| | NEED FOR RESOLUTION OF OWNERSHIP STRUCTURE AT THIS TIME |
| | AS THE PSA CONTEMPLATES THE EQUITABLE DISCUSSION OF |
| | PERMANENTLY RELOCATING THE ITC WHICH DISCUSSIONS ARE |
| | ONGOING AND INCLUDE THE CITY AND CRA. FUTURE |
| | DISPOSITIONS WILL BE PURSUANT TO APPLICABLE LAW. |
| | ZONING 8.19 - [ACKNOWLEDGED] |
| | |
| | G. THE JUSTIFICATION STATEMENT INDICATES THAT THE |
| | AGREEMENT FOR PURCHASE AND SALE INCLUDES THE SFRTA, YET |
| | THEY ARE NOT SHOWN AS A PARTY TO STAFFS COPY OF THE |
| | AGREEMENT. WILL THE SFRTA RETAIN ANY OWNERSHIP AND IF |
| | SO, HOW WILL THE PARCEL BE SUBDIVIDED? [LEGAL |
| | SUBDIVISION PROCESS I.E. VERTICAL SUB DIVISION, WILL BE |
| | PURSUED] [SFRTA USES THE PARKING LOT PURSUANT TO AN |
| | EASMENT FROM THE COUNTY. THE APPLICANT HAS AN AGREEMENT |
| | WITH SFRTA TO PROVIDE EITHER FEE SIMPLE OR AN EASEMENT |
| | FOR ANY USE OF THE SFRTA PROPERTY BORDERING THE |
| | TRACKS.] |
| | [NOT SATISFIED] PLEASE PROVIDE COPY OF AGREEMENT. |
| | |
| | TV JULY 19TH RESPONSE: COPIES OF THE SFRTA AGREEMENTS |
| | HAVE BEEN FORWARDED TO THE CITY. |
| | |
| | ALSO PLEASE NOTE THAT THE SFRTA WAS A PARTNER IN THE |
| | RFP AND PARTICIPATED WITH THE CITY AND OTHERS IN THE |
| | RFP SELECTION PROCESS AND APPROVED THE PSA ALONG WITH |
| | THE CITY AND OTHERS. |
| | |
| | THERE IS ALSO A SEPARATE AGREEMENT WITH SFRTA FOR THE |
| | PURCHASE OF THE 250 TRI-RAIL PARKING SPACES AND WHICH |
| | ALSO PROVIDES FOR THE DEVELOPMENT UPON THE SFRTA |
| | PROPERTY BY TV. PLEASE NOTE THAT THE SFRTA HAS PROVIDED |
| | A CONSENT TO TV TO FILE THIS AMENDED SITE PLAN. |
| | |
| | THE AGREEMENT BETWEEN TV AND THE SFRTA ALSO CONTAINS |
| | PROVISIONS RELATING TO CERTAIN PROPERTY ALONG THE |
| | TRACKS AND THE ITC OWNED BY THE SFRTA. THE FEE |
| | OWNERSHIP OF THIS PROPERTY IS NOT BEING CHANGED AND THE |
| | SFRTA APPROVED THE AMENDED SITE PLAN AND THE AGREEMENTS |
| | PROVIDE FOR THE SFRTA TO EXECUTE AGREEMENTS/S/OR OTHER |
| | AGREEMENTS MEMORIALIZING THE PEDESTRIAN PATH FROM THE |
| | RAILROAD PLATFORM TO BANYAN, AND AS OTHERWISE REQUIRED |
| | AS PER THE AMENDED SITE PLAN (CONNECTING STAIRS, |
| | CONNECTING PEDESTRIAN BRIDGE, SUPPORT COLUMNS). COPIES |
| | OF THE TRANSIT VILLAGE-SFRTA AGREEMENTS HAS BEEN |
| | SEPARATELY PROVIDED. |
| | ZONING 8.19 - [ACKNOWLEDGED] |
| | |
| | 4. TRANSIT VILLAGE BOUNDARY DIAGRAM SHEET A0-03 |
| | DIFFERENT FROM THE ?ITC PROPERTY MAP? AND REQUIRED |
| | MODIFICATIONS FROM ORIGINAL APPROVAL IN OCT. 2011. |
| | CLEARLY SHOW THE ITC BOUNDARY ON THE GROUND LEVEL AND |
| | SECOND LEVEL OF THE VARIOUS PLANS. [THIS PLAN IS PART |
| | OF THE PSA AND THE BOUNDARIES HAVE BEEN ADJUSTED BY |
| | AMENDMENTS. THE CURRENT PLAN IS ACCURATE] [PARTIALLY |
| | SATISFIED] THANK YOU FOR PROVIDING AN ADJUSTED BOUNDARY |
| | MAP FOR THE PROJECT. BASED ON THIS NEW MAP, PLEASE |
| | CLARIFY, DOES THE ITC OWN THE GROUND-LEVEL PORTION OF |
| | THE HOTEL/OFFICE? THE BOUNDARY SHEET A0-03 SHOWS |
| | RETAIL, FCC, ELEVATORS/STAIRS AND MOTOR LOBBY WITHIN |
| | THE ITC PROPERTY BOUNDARY. |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE ABOVE. |
| | ZONING 8.19 - [ACKNOWLEDGED] |
| | |
| | 5. THERE ARE NUMEROUS UTILITY AND OTHER EASEMENTS SHOWN |
| | ON THE SURVEY. ALL OF THESE EASEMENTS MUST BE SHOWN ON |
| | THE SITE AND LANDSCAPE PLANS (GROUND LEVEL AND SECOND |
| | PROPOSED DEVELOPMENT. [PLANS REVISED TO REFLECT ALL |
| | EASEMENTS ON GROUND AND SECOND LEVELS.] [NOT SATISFIED] |
| | THANK YOU FOR PROVIDING REVISED SURVEY AND PLANS WITH |
| | EASEMENTS ILLUSTRATED. BASED UPON THESE SHEETS AND |
| | ITEMS: |
| | |
| | - RESUBMITTED SURVEY DOES NOT APPEAR TO BE ACCURATE, |
| | DOES NOT FULLY REFLECT NEW BANYAN STREETSCAPE |
| | CONDITIONS AND UPDATES. MISSING THE HARDENING DONE BY |
| | FPL TO THEIR TRANSMISSION LINES, THERE IS A NEW/LARGER |
| | POLE ON BANYAN. THE LINES FROM THIS POLE RUN THROUGH |
| | THE FUTURE BUILDING. TREE GRATES ON BANYAN SIDE NO |
| | LONGER EXIST. ROW INCLUDES BIKE PATH AND PEDESTRIAN |
| | SIDEWALK. |
| | - PROVIDED SURVEY SHOWS 20? OVERHEAD UTILITY LINE |
| | EASEMENT ALONG RAILROAD/EASTERN PORTION OF PROPERTY, |
| | NOT REFLECTED IN SITE PLANS. PLEASE PROVIDE FPL |
| | APPROVALS TO VACATE OR MODIFY THIS EASEMENT. |
| | - ARE THE FIBER OPTIC EASEMENT AND FPL EASEMENT, ON THE |
| | SOUTHERN END OF PROPERTY TO REMAIN OR ARE THEY TO BE |
| | MODIFIED/VACATED? PLEASE PROVIDE NECESSARY APPROVALS IF |
| | VACATING OR MODIFYING. THESE PORTIONS OF THE EASEMENTS |
| | LIKELY WON?T BE IMPACTED BY ANY DEVELOPMENT, BUT NOTE |
| | TREES/LANDSCAPING MAY CONFLICT. |
| | - PROVIDED SURVEY SHOWS 20? FIRE EMERGENCY ACCESS |
| | EASEMENT. THIS WILL HAVE TO BE MODIFIED TO ALIGN WITH |
| | THE PROPOSED EGRESS. PLEASE PROVIDE APPROVALS FROM FIRE |
| | DEPT. TO ALTER THIS. |
| | - PROVIDED SURVEY SHOWS A CROSS ACCESS EASEMENT ON THE |
| | EASTERN BOUNDARY AS PART OF THE ITC, IS THIS TO REMAIN? |
| | |
| | TV JULY 19TH RESPONSE: THE SURVEY HAS BEEN REVISED TO |
| | SHOW ALL EASEMENTS (SEE SHEETS C03 AND C20). TRANSIT |
| | VILLAGE HAS BEEN WORKING WITH FPL ON RELOCATION OF THE |
| | LINES, INCLUDING ANY LINES THAT MAY BE WITHIN ANY |
| | PROPOSED BUILDING AREA FOR WHICH NO EASEMENT HAS BEEN |
| | GRANTED. |
| | [ACKNOWLEDGED] HAS FPL GRANTED ANY APPROVALS OR |
| | PROVIDED WRITTEN CONSENT OR SUPPORT FOR THE VACATING OF |
| | EASEMENTS OR MODIFICATION OF POLE LOCATIONS? MANY OF |
| | THE EXISTING CONCRETE HARDENING POLES LIE WITHIN THE |
| | PROPOSED BUILDING?S AREA OR THE MODIFIED ITC LOOP. |
| | PLEASE PROVIDE FPL CONSENT TO THIS ITEM. |
| | |
| | THE FIBER OPTIC AND FPL EASEMENTS ON THE SOUTHERN END |
| | ARE EXPECTED TO REMAIN. |
| | ZONING 8.19 - [ACKNOWLEDGED] |
| | |
| | THE 20? FIRE EMERGENCY ACCESS EASEMENT IS WITHIN THE |
| | AREA SHOWN ON SHEETS A1-01 AND C-03 AND WILL CONTINUE |
| | TO ALIGN WITH THE PROPOSED INGRESS AND EGRESS. FIRE |
| | DEPARTMENT APPROVAL WILL BE OBTAINED PRIOR TO OBTAINING |
| | A BUILDING PERMIT. THE EASEMENT HAS NOT BEEN MODIFIED |
| | FROM THE PRIOR SITE PLAN APPROVAL. ZONING 8.19 - |
| | [ACKNOWLEDGED] |
| | |
| | THE SURVEY SHOWS A CROSS ACCESS EASEMENT ON THE EASTERN |
| | BOUNDARY AS PART OF THE ITC THAT IS TO REMAIN. |
| | ZONING 8.19 - [ACKNOWLEDGED] |
| | |
| | |
| | 6. PLEASE DOCUMENT AND IDENTIFY ALL REQUESTED |
| | VARIANCES AND WAIVERS FOR THE PROPOSED SITE PLANS. [1) |
| | EXISTING ENTRANCE WIDTH VARIANCE EXISTING APPROVED |
| | CONDITION TO BE CARRIED FORWARD 2) SAME VARIANCE TO |
| | ALLOW THE PUBLIC OPEN SPACE TO BE PROVIDED AS A PUBLIC |
| | PLAZA ON LEVEL 2] [NOT SATISFIED] BASED UPON THE |
| | DOCUMENTATION PROVIDED WITHIN THIS RESUBMITTAL, THE |
| | PROJECT WILL REQUIRE/SEEK MORE THAN THE TWO PROPOSED |
| | VARIANCES. PLEASE ADDRESS ALL COMMENTS AND NOTE ANY |
| | DEVIATION FROM THE MINIMUM / MAXIMUM. |
| | - OPEN SPACES NEED ADJUSTMENT AND CLARIFICATION IN |
| | TYPOLOGY AND HOW REQUIREMENTS ARE MET, MAY CONSTITUTE |
| | ADDITIONAL VARIANCES. |
| | -PROPOSED PUBLIC OPEN SPACE ON 2ND FLOOR, REQUIRES |
| | APPROVAL FROM BOARD, WILL SEEK IN THE FORM OF A |
| | VARIANCE. |
| | - MAXIMUM FOOTPRINT LENGTH EXCEEDS 350 FT. FOR TOD-25 |
| | WOULD REQUIRE VARIANCE. |
| | - THE NUMBER OF ACCESS POINTS ONTO EACH RIGHT OF WAY |
| | EXCEEDS THE 2 PERMITTED VIA SEC. 94-312 AND NO PROPERTY |
| | SHALL HAVE A TOTAL OF MORE THAN 4 ACCESS POINTS. WILL |
| | REQUIRE AN ADDITIONAL VARIANCE REQUEST. |
| | THESE ARE JUST SOME EXAMPLES OF PENDING VARIANCE |
| | REQUESTS, ADDITIONAL VARIANCES ARE DEPENDENT ON MEETING |
| | OTHER REQUIREMENTS OUTLINED IN THE COMMENTS OR WITHIN |
| | THE CODE, UPON RESBMITTAL. |
| | |
| | IT IS ON THE APPLICANT TO PROVIDE ALL REQUESTED |
| | VARIANCES TO PLANNING STAFF. PLEASE REMEMBER THAT YOU |
| | WILL BE CHARGED $300 PER ADDITIONAL VARIANCE OR WAIVER. |
| | |
| | TV JULY 19TH RESPONSE: WE ANTICIPATE NEEDING VARIANCES |
| | RELATED TO THE FOLLOWING: |
| | ? MAXIMUM BUILDING FOOTPRINT LENGTH EXCEEDS 350 FT. |
| | ? THE NUMBER OF ACCESS POINTS ONTO CLEARWATER EXCEEDS |
| | THE 2 PERMITTED VIA SEC. 94-312. |
| | ? CURB CUTS, PARKING ENTRANCES AND DRIVEWAYS WIDTHS |
| | ? PLANAR BREAKS GROUND FLOOR |
| | ? PLANAR BREAKS PODIUM LEVELS 2-7 |
| | |
| | WE BELIEVE THAT THE OPEN SPACE REQUIREMENT IS MET ON |
| | THE GROUND FLOOR WITHOUT USING LEVEL 2 AND THE LEVEL 2 |
| | OPEN SPACE IS BONUS SPACE, SO NO VARIANCE IS REQUIRED. |
| | |
| | ZONING 8.19 - [ACKNOWLEDGED] DUE TO THE UNRESOLVED |
| | COMMENTS WITHIN THIS REVIEW, ADDITIONAL VARIANCES MAY |
| | BE REQUIRED OR EXISTING REQUESTS MAY HAVE TO BE |
| | MODIFIED. |
| | |
| | 7. PLEASE PROVIDE AN UPDATED SURVEY CLEARLY |
| | DOCUMENTING THE CHANGES INCORPORATED AS PART OF THE |
| | RECENT BANYAN-BOULEVARD STREETSCAPE PROJECT. ALL PLAN |
| | SHEETS MUST REFLECT THE ACCURATE BANYAN STREET |
| | CONFIGURATION. THIS IS CURRENTLY NOT REFLECTED ON ANY |
| | OF THE SUBMITTED PLAN SHEETS. [SURVEY UPDATED TO SHOW |
| | CHNAGES TO BANYAN BOULEVARD GEOMETTRY] [NOT SATISFIED] |
| | THANK YOU FOR PROVIDING REVISED SURVEY AND PLANS WITH |
| | EASEMENTS ILLUSTRATED. BASED UPON THESE SHEETS AND |
| | ITEMS: |
| | |
| | SEE COMMENT 5. RESUBMITTED SURVEY DOES NOT APPEAR TO |
| | BE ACCURATE, DOES NOT FULLY REFLECT NEW BANYAN |
| | STREETSCAPE CONDITIONS AND UPDATE. MISSING THE |
| | HARDENING DONE BY FPL TO THEIR TRANSMISSION LINES, |
| | THERE IS A NEW / LARGER POLE ON BANYAN. TREE GRATES ON |
| | BANYAN SIDE NO LONGER EXIST. ROW INCLUIDES A BIKE PARTH |
| | AND PEDESTRAIN SIDEWALK. |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE RESPONSE ABOVE. THESE |
| | ROAD IMPROVEMENTS WHICH ARE INCONSISTENT WITH THE |
| | CURRENT SITE PLAN APPROVAL ARE ONGOING. TO ADDRESS THIS |
| | COMMENT, WE HAVE INCORPORATED THE IMPROVEMENTS SHOWN ON |
| | THE BANYAN AVENUE CONSTRUCTION PLAN PROVIDED BY WPB |
| | ENGINEERING DEPARTMENT ON THE PROPOSED PLANS. |
| | ZONING 8.19 - [SATISFIED] RESUBMITTED SURVEY APPEARS TO |
| | ACCURATELY REFLECT SITE CONDITIONS, SURROUNDING |
| | CONTEXT, AND BANYAN STREETSCAPE. VACATING/MODIFYING THE |
| | FPL EASEMENT ACROSS THE SITE AND RELOCATING CONCRETE |
| | POWER POLES POSES MAJOR CONCERNS TO LOCATION OF |
| | PROPOSED STRUCTURES OR IMPROVEMENTS WITHIN THE SITE |
| | PLAN. |
| | |
| | UPON REVIEW OF NEWLY SUBMITTED SURVEY, CURRENT |
| | CONDITIONS ARE NOT REFLECTED. FPL CURRENTLY HAS TWO |
| | DISTRIBUTION POLES ON THE BANYAN FRONTAGE, ONE OF WHICH |
| | IS A NEW POLE (ADDED WITH THE BANYAN STREETSCAPE |
| | IMPROVEMEN TS); PLEASE PROVIDE A LETTER FROM FPL |
| | CONFIRMING/ APPROVING OF THE RELOCATION OF THIS POLE |
| | AND THE VACATION/MODIFICATION OF THE EASEMENT. SITE |
| | PLANS AND CIVIL PLANS SHOW ON-STREET DROP-OFF, WHICH IS |
| | NOT PE RMITTED WITHIN THE TOD DISTRICT ON BANYAN. |
| | |
| | A. PROPOSED RESIDENTIAL ON-STREET DROP OFF ON BANYAN |
| | FRONTAGE NOT PERMITIED WITHIN TOD-25 DISTRICT. [THIS IS |
| | AN EXISTING VESTED FEATURE WHICH THE APPLICANT BELIEVES |
| | OFFERS A SAFE PLACE OUTSIDE OF THE RIGHT OF AWAY FOR |
| | RESIDENTS TO BE PICKED UP BY RIDE SHARE PROVIDERS.] |
| | [NOT SATISFIED] REPEAT COMMENT. PROPOSED RESIDENTIAL |
| | ON-STREET DROP OFF ON BANYAN FRONTAGE NOT PERMITTED |
| | WITHIN TOD-25 DISTRICT |
| | |
| | RESPECTFULLY NOTE HERE ARE NO VESTED / CARRIED OVER |
| | APPROVALS, THIS IS A NEW SITE PLAN/PROJECT. PER SECTION |
| | 94-111 TABLE IV-11: ON-STREET PASSENGER LOADING AND |
| | DROP-OFF IS NOT PERMITTED WITHIN THE TOD DISTRICT ALONG |
| | AVENUE STREET CLASSIFICATIONS (BANYAN BOULEVARD). |
| | |
| | ADDITIONALLY, THE PROPOSED DROP-OFF DIRECTLY CONFLICTS |
| | WITH THE NEW BANYAN STREETSCAPE. CONFLICTING WITH THE |
| | IMPROVED PEDESTRIAN ENVIRONMENT WITH THE BIKE LANE / |
| | SIDEWALK. |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE RESPONSE ABOVE. AS TO |
| | THE PREVIOUSLY APPROVED BANYAN STREET DROP-OFF, TV HAS |
| | REMOVED THIS FROM ITS AMENDED SITE PLAN SUBMISSION. |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | 8. SETBACKS ARE MEASURED FROM THE BACK OF CURB, NOT |
| | FROM THE PROPEORTY LINE. [PLANS REVISED TO SHOW SETBACK |
| | FROM BACK OF CURB] |
| | |
| | A. SETBACK ON BANYAN (GROUND 5) IS 16? MIN. AND 50? |
| | MAX. (AVENUE-CLASSIFICATION) CONDITIONAL SETBACK FOR |
| | PARKING ABOVE 5TH STORY IS 31? MIN. [THE PLANS PROVIDED |
| | MEET THE REQUIRED SETBACK_CRITERIA AND THE CONDITIONAL |
| | SETBACK FOR PARKING ABOVE 5TH STORY IS COMPLIANT] |
| | [PARTIALLY SATISFIED] THANK YOU FOR THE REVISIONS, |
| | BASED UPON THESE: PLEASE PROVIDE MAX SETBACK AND ANY |
| | APPLICABLE CONDITIONAL SETBACK LINES ON SITE PLANS, |
| | BASED UPON THESE: PLEASE PROVIDE MAX SETBACK AND ANY |
| | APPLICABLE CONDITIONAL SETBACK LINES ON SITE PLANS, |
| | ELEVATIONS, AND RELEVANT FLOOR PLANS, UPDATE DATA TABLE |
| | ON SHEET A0-02 ACCORDINGLY TO REFLECT ALL PROVIDED |
| | SETBACKS PER FRONTAGE. |
| | |
| | TV JULY 19TH RESPONSE: PROVIDED ON PLANS (SEE SHEETS |
| | A0-01,??) PLEASE NOTE THAT THE CONDITIONAL SETBACK FOR |
| | PARKING IS MET AS THE ENTIRE GARAGE IS SET BACK FARTHER |
| | THAN THE STATED MINIMUM. |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | B. SETBACK ON CLEARWATER (GROUND ? 5) IS 12? MIN. AND |
| | 60? MAX. (SECONDARY-CLASSIFICATION) CONDITIONAL SETBACK |
| | FOR PARKING ABOVE 5TH STORY IS 27? MIN. [THE PLANS |
| | PROVIDED MEET THE REQUIRED SETBACK CRITERIA AND THE |
| | CONDITIONAL SETBACK FOR PARKING ABOVE 5TH STORY IS |
| | COMPLIANT] |
| | |
| | C. ABUTIING CSX IS 15? MIN. [ACKNOWLEDGED] [SATISFIED] |
| | |
| | D. REAR 5? MIN. [ACKNOWLEDGED] [SATISFIED] |
| | |
| | E. SIDE INTERIOR O? OR NFPA [ACKNOWLEDGED] [SATISFIED] |
| | |
| | F. SETBACKS INTERNALTO THE PROPERTY BETWEEN COUNTY ITC, |
| | SFRTA, AND APPLICANTS PROPERTIES WARRANT FURTHER |
| | DISCUSSION. AS PREVIOUSLY STATED, THE PROJECT SITE IS |
| | SPLIT BETWEEN 2 SEPARATE PARCELS, AND POTENTIAL |
| | VERTICAL SUBDIVISION. [SETBACK AND SEPARATION WILL BE |
| | HANDLED BY SEPARATE AGREEMENT BETWEEN THE AFFECTED |
| | PARTIES] [NOT SATISFIED] FURTHER CLARIFICATION / |
| | DISCUSSIONS NEEDED WITH VERTICAL SUBDIVISION |
| | |
| | TV JULY 19TH RESPONSE: SEE RESPONSE ABOVE. |
| | ZONING 8.19 - [ACKNOWLEDGED] |
| | |
| | 9. PARKING: THE PARKING TABLE NEEDS TO BE CORRECTED TO |
| | BETTER CONVEY THE PARKING COUNTS. PLEASE NOTE, WHILE |
| | NOT MANDATORY, STAFF HAS INCLUDED THE ADDITIONAL |
| | ALLOWED 25% TOD PARKING SPACE REDUCTION. [SEE PARKING |
| | BREAKDOWN AND MIN MAX COMPARISON PROVIDED. THE TOTAL |
| | MINIMUM PARKING PERMITIED IS 1,684 OR (1,347 LESS 20% |
| | REDUCTION FOR TOD) |
| | |
| | TOTAL MAXIMUM PARKING PERMITIED IS 3,142 OR (2,514 |
| | LESS 20% REDUCTION FOR TOD) |
| | |
| | STRAIGHT CODE TEST: |
| | |
| | MINIMUM AND MAXIMUM RANGE WITHOUT TOD REDUCTION IS |
| | 1,684 TO 3,142 SPACES. THEREFORE THE 2,003 PROPOSED |
| | SPACES IS COMPLIANT TO LDRS |
| | |
| | MINIMUM AND MAXIMUM RANGE WITH TOD REDUCTION IS 1,347 |
| | TO 2,514 SPACES. THEREFORE THE 2,003 PROPOSED SPACES IS |
| | COMPLIANT TO LDRS EVEN WITH THE NON MANDATORY 20% |
| | REDCUTION IMPOSED |
| | |
| | NON-CODE TEST EXCLUDING THE SFRTA AND COUNTY SPACES |
| | EVEN WITH THE SFRTA COUNTY SPACES COUNTED AS ALL BEING |
| | ABOVE MINIMUM THE PARKING PROVIDED WOULD STILL COMPLY |
| | WITH THE LDRS SEE BELOW: |
| | |
| | THE REQUIRED MINIMUM PARKING LESS THE SFRTA AND CONTY |
| | 275 SPACES WOULD BE 1,409 SPACES OR (1,127 SPACES |
| | REQUIRED IF THE 20% REDUCTION WAS APPLIED.) |
| | |
| | THE REQUIRED MAXIMUM PARKING LESS THE SFRTA AND COUNTY |
| | 275 SPACES WOULD BE 2,867 SPACES OR (2,294 SPACES |
| | REQUIRED IF THE 20% REDUCTION WAS APPLIED.) |
| | |
| | MINIMUM AND MAXIMUM RANGE WITHOUT TOD REDUCTION IS |
| | 1,409 TO 2,867 SPACE. THEREFORE, THE PROPOSED 2,003 |
| | SPACES IS COMPLIANT TO LDRS EVEN IF THE 275 SPACES FOR |
| | THE SFRTA AND COUNTY WERE NOT RECOGNIZED AS A VALID |
| | PUBLIC USE. |
| | |
| | MINIMUM AND MAXIMUM RANGE WITH TOD REDUCTION IS 1,127 |
| | TO 2,294 SPACE. THEREFORE, THE PROPOSED 2,003 SPACES |
| | WOULD STILL BE COMPLIANT TO LDRS EVEN WITH THE |
| | NON-MANDATORY 20% REDUCTION IMPOSED WITHOUT THE 275 |
| | SPACES FOR THE SFRTA AND COUNTY BEING RECOGNIZED AS A |
| | VALID PUBLIC USE. |
| | |
| | THE 2003 SPACES PROVIDED IS VWITHINTHE STATED MINIMUM |
| | AND MAXIMUMS PERMITTED BY CODE NO MATTER THE APPROACH |
| | USED] [PARTIALLY SATISFIED] REPEAT COMMENT FROM (2.D.) |
| | |
| | THANK YOU FOR PROVIDING THE NECESSARY DOCUMENTATION ON |
| | THE PSA AND ITS AMENDMENTS, IN ADDITION TO THE PARKING |
| | BREAKDOWN; BASED UPON THIS: |
| | |
| | -THE HOTEL ROOM/ AMENITY, RESIDENTIAL, RETAIL, OFFICE, |
| | GUEST AND SFRTA/COUNTY PARKING SPACES CHECK OUT WITH |
| | REQUIRED MINIMUMS AND 25% TOD REDUCTION. |
| | - CLARIFICATION, TABLE IV-9: MICRO-UNITS MINIMUM |
| | PARKING REQUIREMENT IS ZERO, NOT 1 /13 UNITS. ONLY |
| | CAR-SHARE HAS 1 /13 REQUIREMENT. |
| | - PLEASE MAKE CLEAR FROM THE TABLE PROVIDED, ARE YOU |
| | PROVIDING ONLY 13 SPACES FOR MICRO-UNITS? OR ARE YOU |
| | ARE PROVIDING 13 SPACES FOR MICRO-UNITS AND THEN |
| | ADDITIONAL 13 CAR?SHARE SPACES (26 TOTAL) THE CAR-SHARE |
| | SPACES WOULD BE INDEPENDENT FROM OTHER PARKING AND |
| | DESIGNATED/RESERVED AS SUCH. PER SECTIONS 94-106(8.A) A |
| | PROJECT WITH RESIDENTAIL MICRO UNIT SHALL PROVIDE ON |
| | SIOTE CAR SHARE STATIONS ON A RATIO OF ONE PER EVERY 13 |
| | UNITS. THE TOTAL AMOUNT OF CAR-SHARE STATIONS MAY BE |
| | REDUCED BY ONE CAR-SHARE STATION PER EVERY 13 ON-SITE |
| | PARKING SPACES PROVIDED. THE TOTAL NUMBER OF CAR-SHARE |
| | STATIONS MAY BE ADJUSTED BASED ON CURRENT SYSTEM |
| | KDEMANDS BUT A MINIMUM OF ONECAR-SHARE STATION SHALL BE |
| | PROVIDED. THE REMAINDER OF THE SPACES SHALL BE RESERVED |
| | FOR FUTURE SERVICE EXPANSION. |
| | |
| | A. OFFICE: MIN. 2.5/1000SF = 457 SPACES (MAX. 4/1000SF |
| | = 731 SPACES) AFTER 25% TOD REDUCTION, 343 REQUIRED |
| | PROVIDING 365 SPACES [SEE ABOVE] [SATISFIED] OFFICE |
| | PARKING FALLS WITHIN MIN/MAX. CLARIFICATION, OFFICE |
| | MINIMUM IS 2.5/1000 SF NOT 2/1000 SF. |
| | B. HOTEL: MIN. 1 /4ROOMS = 27 SPACES, 1 /800 SF= 11 |
| | SPACES (MAX. 1 /R000 = 108 SPACES, 1 /400 SF= 23 |
| | SPACES);_AFTER 25% TOD REDUCTION, 29 REQUIRED; |
| | PROVIDING 38 SPACES [SEE ABOVE] [SATISFIED] |
| | C. COMMERCIAL: MIN. 2/1000 SF= 110 SPACES (MAX. 4/1000 |
| | SF= 219 SPACES) AFTER 25% TOD REDUCTION, 83 REQUIRED; |
| | PROVIDING 110 SPACES [SEE ABOVE] [SATISFIED] |
| | D. D. RESIDENTIAL: MIN. 1 /UNIT= 821 SPACE, 1 /20 |
| | GUEST= 41 GUEST (MAX. 2/UNIT = 1,642 SPACES, 41 GUEST) |
| | AFTER 25% TOD REDUCTION, 661 REQUIRED; PROVIDING 896 |
| | SPACES TOTAL, NEED A CLEARER BREAKDOWN. [SEE PARKING |
| | DATA PROVIDED] SATISFIED] |
| | E. MICRO-UNITS: MIN. 0/UNIT (MAX.0.5/UNIT = 83 SPACES, |
| | 1 /20 GUEST= 8 SPACES); PROVIDED NEED CLEARER |
| | BREAKDOWN. [SEE PARKING DATA PROVIDED] [PARTIALLY |
| | SATISFIED] PLEASE MAKE CLEAR FROM THE TABLE PROVIDED, |
| | ARE YOU PROVIDING ONLY 13 SPACES FOR MICRO-UNITS? OR |
| | ARE YOU ARE PROVIDING 13 SPACES FOR MICRO-UNITS AND |
| | THEN ADDITIONAL 13 CAR-SHARE SPACES (26 TOTAL)? THE |
| | CAR-SHARE SPACES WOULD BE INDEPENDENT FROM OTHER |
| | PARKING AND DESIGNATED/RESERVED AS SUCH. PER SECTION |
| | 94-106 (8.A) A PROJECT WITH RESIDENTIAL MICRO-UNITS |
| | SHALL PROVIDE ON-SITE CAR-SHARE STATIONS ON A RATIO OF |
| | ONE PER EVERY 13 UNITS. THE TOTAL AMOUNT OF CAR-SHARE |
| | STATIONS MAY BE REDUCED BY ONE CAR-SHARE STATION PER |
| | EVERY 13 ON-SITE PARKING SPACES PROVIDED. THE TOTAL |
| | NUMBER OF CAR-SHARE STATIONS MAY BE ADJUSTED BASED ON |
| | CURRENT SYSTEM DEMANDS, BUT A MINIMUM OF ONE CAR-SHARE |
| | STATION SHALL BE PROVIDED. THE REMAINDER OF THE SPACES |
| | SHALL BE RESERVED FOR FUTURE SERVICE EXPANSION. |
| | |
| | TV JULY 19TH RESPONSE: MICRO UNITS ARE PROPOSED TO BE |
| | PARKED TO CODE WITH 0 SPACES PER UNIT, 13 SHARED CAR |
| | SPACES, AND 8 GUEST SPACES WITH 83 BIKES TABULAR DATA |
| | ON SHEET A0-02 HAS BEEN UPDATED. |
| | ZONING 8.19 - [SATISFIED] PLEASE INCLUDE THE TABULAR |
| | DATA FOR THE PARKING BREAKDOWN ON SHEET A0-02. |
| | |
| | F. LIVE/WORK UNITS: MIN. 2/1000 SF= 534 SPACES (MAX. |
| | 4/1000SF = 1068 SPACES); AFTER 25% TOD REDUCTION, 400 |
| | REQUIRED; PROVIDING NEED CLEARER BREAKDOWN. ALSO THERE |
| | ARE A TOTAL OF 12 LIVE/WORK UNITS FOR 267,000 SF, |
| | ASSUMING -22,250 SF EACH? PLEASE EXPLAIN THESE UNITS. |
| | [THERE ARE NO LIVE WORK UNITS PROPOSED] [SATISFIED] |
| | |
| | PRIOR TV RESPONSE: JUSTIFICATION LETTER SPOKE TO |
| | PREVIOUS APPROVAL LIVE-WORK UNITS, THESE ARE NOT |
| | CARRIED OVER TO THE CURRENT PROJECT. ZONING 8.19 - |
| | [ACKNOWLEDGED] |
| | |
| | |
| | G. SFRTA AND ITC PARKING: MIN . 290 SPACES (250 FOR |
| | SFRTA PATRONS AND 40 FOR SFRTA/COUNTY); PROVIDING 275? |
| | WHY THE SHORTAGE OF 15 SPACES PER THE PSA? [PSA (AS |
| | AMENDED) REQUIRES 275 SPACES 250 FOR SFRTA AND 25 FOR |
| | THE COUNTY] [SATISFIED] LATEST AMENDMENT TO PSA |
| | (EXHIBIT 2) THAT WAS PROVIDED WITH RESUBMITIAL STATES: |
| | 250 PARKING SP??CES FOR TRI-RAIL, AND 25 SPACES FOR |
| | COUNTY. |
| | |
| | H. TOTAL MIN REQUIRED: 1,467 SPACES (WITHOUT ANY FOR |
| | MICRO-UNITS AND NOT INCLUDING 534 FOR LIVE/WORK) |
| | 2001WITH LIVE/WORK INCLUDED; 2,291 WITH SFRTA/ITC |
| | PARKING. NOT COUNTING 25% REDUCTION. PROVIDING 2,003 |
| | SPACES WITH 319 UNALLOCATED. EXPLAIN THE UNALLOCATED. |
| | [EVERY USE IS PARKED AT THE MINIMUM, ALL EXCESS SPACES |
| | HAVE BEEN POOLED TOGETHER IN THE UNALLOCATED CATEGORY |
| | SO THEY ? CAN BE USED AS FLEXIBLE OVER FLOW TO SERVE |
| | ENTIRE PROJECT WHEN NEEDED] [SATISFIED] PARKING |
| | TABLE/DATA PROVIDED. |
| | |
| | I. BIKE PARKING: MIN. 1/15 COMMERCIAL/HOTEL/OFFICE= 40 |
| | SPACES REQUIRED, 1 /15 RESIDENTIAL= 57 SPACES REQUIRED, |
| | ALSO NEED TO PROVIDE A SHOWER/CHANGING FACILITY WITHIN |
| | 200 FT. OF BUILDING ENTRANCE. PROVIDING 116 COMMERCIAL, |
| | 100 RESIDENTIAL. [COVERED BIKE PARKING IS PROVIDED AT |
| | THE GROUND FLOOR OF THE GARAGE. THE REQUIRED SHOWERING |
| | CHANGING FACILITY IS ALSO PROVIDED AND SHOWN ON THE |
| | LEVEL TWO PLAZA APPROXIMATELY 75 FEET NORTH OF OFFICE |
| | AND HOTEL LOBBY ENTRANCE. THESE FACILITIES ARE ALSO |
| | ACCESSIBLE FROM THE PARKING GARAGE SOUTHEAST ELEVATOR |
| | AND STAIR.] [NOT SATISFIED] UPON REVIEW OF RESUBMITIED |
| | PARKING DATA, REQUIRED SPACES ARE 1 /15 SPACES |
| | (COMMERCIAL, OFFICE, HOTEL) AND 1 /1 SPACES |
| | (RESIDENTIAL). TOTALING 35 AND 59 REQUIRED BIKE SPACES |
| | RESPECTIVELY. PLEASE PROVIDE TOTAL COUNT OF BIKE SPACES |
| | INTERNAL TO BUILDING ON SHEET A0-02, DIAGRAM ON A5-02 |
| | PROVIDES 72 SPACES (2 PER RACK), REQUIREMENT IS 94 FOR |
| | THESE PROJECT USES. |
| | |
| | MICRO-UNIT PROVISIONS (PER. SEC. 94-106 8.A.) REQUIRES |
| | 0.5 BICYCLE PARKING SPACES PER UNIT. REQUIRING 83 |
| | SPACES |
| | |
| | BIKE SPACES SHALL BE DISTRIBUTED AMONGST THE |
| | BUILDINGS/VARIED USERS NOT CONCENTRATED WITHIN A SINGLE |
| | ROOM OR LOCATION. OFFICE/HOTEL USERS HAVE TO TRAVEL |
| | OVER 600 FT. TO ACCESS ENCLOSED BIKE PARKING. |
| | RETAIL/COMMERCIAL USERS ON BANYAN/CLEARWATER SIDE HAVE |
| | TO TRAVEL THE SAME 600+ FT. DISTANCE TO ACCESS SHOWERS. |
| | RECOMMEND THAT THE DISTRIBUTION SHOULD ENTAIL A MORE |
| | APT RATIO OR DISTRIBUTION OF ONE ENCLOSED/SECURED BIKE |
| | ROOM AND SHOWER FACILITY PER TOWER. |
| | |
| | TV JULY 19TH RESPONSE: A PUBLIC SHOWER AREA IS NOW |
| | PROVIDED IMMEDIATELY ADJACENT TO THE EASTERN PUBLIC |
| | BIKE ROOM. |
| | ZONING 8.19 - [SATISFIED] NEW SHOWER FACILITY PROVIDED. |
| | PLEASE PROVIDE DETAIL SHEET SIMILAR TO A5-02 FOR THE |
| | ADDITIONAL RACKS/BIKE ROOMS SHOWN ON A1.01-A1.05 |
| | |
| | 1. PROVIDE SECURE RESIDENT BICYCLE ROOMS. PROVIDE |
| | NON-RESIDENTIAL COVERED BICYCLE PARKING "AREAS |
| | DISTRIBUTED THROUGHOUT THE SITE. PROVIDE THE DIMENSIONS |
| | FOR THE BICYCLE PARKING AREAS ON THE PLANS. [COVERED |
| | SECURE BIKE PARKING IS PROVIDED AT THE GROUND FLOOR |
| | LEVEL OF THE GARAGE] [DETAILS AND DIMENSIONS PROVIDED] |
| | [NOT SATISFIED] UPON REVIEW OF RESUBMITIED PARKING |
| | \DATA; BIKE PARKING INTERNAL TO BUILDING NEEDS TO MEET |
| | MINIMUM REQUIREMENTS OF 94 SECURED SPACES, GROUND FLOOR |
| | ONLY SHOWS 72 SPACES. NOT INCLUDING ADDITIONAL 83 |
| | SPACES DEDICATED TO MICRO-UNIT USE. ON SHEETS A1-03, |
| | A1-04, AND A1-05 ROOM INTERNAL TO GARAGE LABELED |
| | SCOOTER/BIKE PARKING? HOW ARE THESE ROOMS / SPACES |
| | ACCESSED, ARE THERE ADDITIONAL RACKS LOCATED HERE, AND |
| | WHAT ARE THE DIMENSIONS. PLEASE PROVIDE MORE DETAIL OF |
| | THESE AREAS. |
| | |
| | REPEAT FROM (9.1.1.) BIKE SPACES SHALL BE DISTRIBUTED |
| | AMONGST THE BUILDINGS/VARIED USERS NOT CONCENTRATED |
| | WITHIN A SINGLE ROOM OR LOCATION. OFFICE/HOTEL USERS |
| | HAVE TO TRAVEL OVER 600 FT. TO ACCESS ENCLOSED BIKE |
| | PARKING. RETAIL/COMMERCIAL USERS ON BANYAN/CLEARWATER |
| | SIDE HAVE TO TRAVEL THE SAME 600+ FT. DISTANCE TO |
| | ACCESS ENCLOSED BIKE PARKGIN. RETAIL / COMMERCAIL USERS |
| | ON BANYAN; CLEARWATER SIDE HAVE TO TRAVEL THE SAME 600+ |
| | FT DISTANCE TO ACCESS SHOWERS. RECOMMEND THAT THE |
| | DISTRUCBUTION SHOULD ENTIAL A MORE APT RATIO OR |
| | DISTRIBUTION, RECOMMEND ONE ENCLOSED / SECURE BIKE ROOM |
| | AND SHOWER FACILITY PER TOWER. |
| | |
| | TV JULY 19TH RESPONSE: ADDITIONAL SECURE BIKE ROOMS |
| | HAVE BEEN ADDED TO THE SOUTHERN RESIDENTIAL BUILDING |
| | AND THE HOTEL/OFFICE BUILDING (SEE SHEETS A1-02, A1-03, |
| | A1-04 AND A1-05. SHOWERS ARE NOT NECESSARY FOR THE |
| | RESIDENTIAL TOWERS. |
| | ZONING 8.19 - [SATISFIED] REPEAT: PLEASE PROVIDE DETAIL |
| | SHEET SIMILAR TO A5-02 FOR THE ADDITIONAL RACKS/BIKE |
| | ROOMS SHOWN ON A1.01-A1.05 |
| | |
| | ACCESS TO BIKE STORAGE LIMITED TO REAR ENTRANCE ON CSX |
| | / BANYAN CORNER OF THE SITE, NO INTERNAL ACCESS APPEARS |
| | TO BE AVAILABLE OUTSIDE OF CROSSING OVER THE ADA |
| | SPACES. PLEASE CONSIDER REVISIONS. |
| | |
| | TV JULY 19TH RESPONSE: A CORRIDOR WAS ADDED TO ACCESS |
| | THE BIKE ROOM AND SHOWER FROM THE EASTERN COVERED |
| | WALKWAY AND NOT THROUGH THE ADA SPACES. |
| | ZONING 8.19 - [SATISFIED] REPEAT: PLEASE PROVIDE DETAIL |
| | SHEET SIMILAR TO A5-02 FOR THE ADDITIONAL RACKS/BIKE |
| | ROOMS SHOWN ON A1.01-A1.05 |
| | |
| | 2. WHERE ARE THE SHOWER/CHANGING FACILITIES LOCATED? |
| | [THE REQUIRED SHOWERING CHANGING FACILITY IS ALSO |
| | PROVIDED AND SHOWN ON THE LEVEL TWO PLAZA APPROXIMATELY |
| | 75 FEET NORTH OF OFFICE AND HOTEL LOBBY ENTRANCE. THESE |
| | FACILITIES ARE ALSO ACCESSIBLE FROM THE PARKING GARAGE |
| | SOUTHEAST ELEVATOR AND STAIR.] [NOT SATISFIED] THANK |
| | YOU FOR PROVIDING SHOWER FACILITIES WITHIN THE PLAN, |
| | PLEASE LABEL AND INDICATE THESE CLEARLY. BASED UPON THE |
| | RESPONSE AND RESUBMITIAL: |
| | |
| | CLARIFICATION, ARE THESE THE THREE ORANGE ROOMS BETWEEN |
| | THE RETAIL BAYS ON SHEET A1-02? CAN THE SHOWER |
| | FACILITIES BE LOCATED CLOSER TO THE PROPOSED BIKE |
| | STORAGE ROOM OR BETIER DISTRIBUTED AMONG THE BUILDINGS? |
| | |
| | REPEAT FROM (9.1.1.) BIKE SPACES SHALL BE DISTRIBUTED |
| | AMONGST THE BUILDINGS/VARIED USERS NOT CONCENTRATED |
| | WITHIN A SINGLE ROOM OR LOCATION. OFFICE/HOTEL USERS |
| | HAVE TO TRAVEL OVER 600 FT. TO ACCESS ENCLOSED BIKE |
| | PARKING. RETAIL/COMMERCIAL USERS ON BANYAN/CLEARWATER |
| | SIDE HAVE TO TRAVEL THE SAME 600+ FT. DISTANCE TO |
| | ACCESS SHOWERS. RECOMMEND THAT THE DISTRIBUTION SHOULD |
| | ENTAIL A MORE APT RATIO OR DISTRIBUTION OF ONE |
| | ENCLOSED/SECURED BIKE ROOM AND SHOWER FACILITY PER |
| | TOWER. |
| | |
| | TV JULY 19TH RESPONSE: AN ADDITIONAL SHOWER LOCATION IS |
| | PROVIDED ADJACENT TO THE EASTERN GROUND FLOOR BIKE ROOM |
| | SO THERE ARE NOW 2 SEPARATE SHOWER FACILITIES. |
| | ADDITIONAL BIKE ROOMS HAVE BEEN DISTRIBUTED ON SITE AND |
| | PROVIDED FOR EACH USE (SEE SHEETS A1-02, A1-03, A1-04 |
| | AND A1-05). |
| | ZONING 8.19 - [SATISFIED] REPEAT: PLEASE PROVIDE DETAIL |
| | SHEET SIMILAR TO A5-02 FOR THE ADDITIONAL RACKS/BIKE |
| | ROOMS SHOWN ON A1.01-A1.05 |
| | |
| | J. IN THOSE CASES WHERE THE SIDE OF ANY PARKING STALL |
| | IS ADJACENT TO A WALL, FENCE, BUILDING, OR OTHER |
| | PHYSICAL OBSTRUCTION, THE STALL WIDTHS SHALL BE |
| | INCREASED BY A MINIMUM OF ONE FOOT. WHERE THERE IS AN |
| | OBSTRUCTION ON BOTH SIDES OF THE STALL, THE STALL |
| | WIDTHS SHALL BE INCREASED BY A MINIMUM OF TWO FEET. |
| | [ACKNOWLEDGED ? WE WILL BE UTILIZING THE ALLOWABLE |
| | PARKING REDUCTIONS AND OR USING COMPACT SPACE |
| | PROVISIONS TO ENSURE PROPER SEPARATION IS MAINTAINED] |
| | (NOT SATISFIED] PLEASE PROVIDE DIMENSIONS OR DETAILS |
| | INDICATING SEPARATION IS MAINTAINED. PLEASE FOLLOW SEC. |
| | 94-485 (N. )(1.) FOR SMALL CAR SPACE REQUIREMENTS, AND |
| | OUTLINE PERCENTAGE/INDICATE ON DRAWINGS ACCORDINGLY. |
| | |
| | TV JULY 19TH RESPONSE: PARKING DETAILS HAVE BEEN |
| | PROVIDED TO SHOW MINIMUM DIMENSION FOR ALL PARKING |
| | SPACES INCLUDING DETAILS DESCRIBING REQUIRED DIMENSIONS |
| | WHEN ADJACENT TO A WALL OR COLUMN (SEE SHEETS C-12, |
| | C-13). |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | 3. PARKING GARAGE HAS INSTANCES WHERE PARKING SPACES |
| | APPEAR TO BE NEXT TO WALLS OR STRUCTURE. [ADJUSTMENTS |
| | TO BE MADE AS INDICATED ABOVE ON FINAL PERMITS TO |
| | ENSURE COMPLIANCE] [NOT SATISFIED] SEE ABOVE |
| | |
| | TV JULY 19TH RESPONSE; SEE ABOVE. |
| | ZONING 8.19 - [SATISFIED] IF COMPACT SPACES ARE TO BE |
| | USED DUE TO CONSTRAINTS OF WALLS, COLUMNS, OR |
| | STRUCTURES, PLEASE ILLUSTRATE ON PLANS AND |
| | DESIGNATE/STRIPE ACCORDINGLY PER SEC. 94-485. |
| | |
| | 4. ADA PARKING SPACES ARE LOCATED IN INEFFICIENT AND |
| | NOT OPTIMAL AREAS. ALL SPACES SHALL HAVE ACCESS TO A |
| | CURB RAMP OR CURB CUT, WHEN NECESSARY, TO ALLOW |
| | ENTRANCE TO THE BUILDING SERVED. SPACES SHALL BE |
| | LOCATED SO THAT USERS ARE NOT COMPELLED TO WALK OR |
| | OTHERWISE MOVE BEHIND PARKED VEHICLES, EXCLUDING OTHER |
| | VEHICLES PARKED IN ADJACENT PARKING SPACES FOR THE |
| | DISABLED. [ADA SPACES HAVE BEEN ADJUSTED TO PROVIDE |
| | EFFICIENT ACCESS ROUTES TO AND FROM ENTRY POINTS OR |
| | ELEVATOR CORES] [NOT SATISFIED] THANK YOU FOR PROVIDING |
| | ADJUSTMENTS AND ALTERING PLANS, BASED UPON THESE |
| | CHANGES: |
| | |
| | ADA DISTRIBUTION AFTER RECONFIGURATION STILL POSES |
| | QUESTIONS FOR CLARIFICATION. |
| | A) PLEASE PROVIDE CLARIFICATION OF HOW ADA PATRONS OF |
| | OFFICE, HOTEL, RETAIL, AND TRI-RAIL USERS WILL SAFELY & |
| | EFFICIENTLY ACCESS THESE FACILITIES FROM THE GARAGE. |
| | |
| | TV JULY 19TH RESPONSE: THE SFRTA AND THEIR ADA PATRONS |
| | WILL ACCESS THE ELEVATOR CORES LOCATED IN THE SOUTHWEST |
| | CORNERS OF THE GARAGE OR FROM THE DESIGNATED HC VAN |
| | ACCESSIBLE SPACES ON THE GROUND FLOOR. THE PLANS HAVE |
| | BEEN AMENDED TO RELOCATE THE ADA SPACES CLOSER TO THE |
| | ELEVATOR AND SHOW THE LOCATION OF THE MOST CONVENIENT |
| | ADA SPACES WITH THE SHORTEST ROUTES TO ACCESS THE |
| | GROUND FLOOR AND OTHER USES ON SITE (SEE SHEET A0-04). |
| | ZONING 8.19 - [SATISFIED] ADA SPACES RELOCATED TO |
| | APPROPRIATE ELEVATOR CORRIDORS. |
| | |
| | B) CURRENT ADA SPACE DISTRIBUTION ON SHEET A1-02 (FOR |
| | SFRTA PATRONS AND COUNTY EMPLOYEES) FORCES ADA USERS TO |
| | TRAVEL THROUGH RESIDENTIAL LOBBY ELEVATORS TO ACCESS |
| | REST OF SITE. DISTRCBUTION OF ADA SPACES ONTHIS LEVEL |
| | SHALL PROVIDE SHORTEST / MOST EFFICENT PATH TO END USE, |
| | ADA SAPCES SHOLD BE LOCATED AT THE ELEVATOR SHAFT |
| | CONNECTED TO UPPER PLAZA AND THE ELEVATOR SHAFT CLOSEST |
| | TO THE TRI RAIL PEDESTRAIN BRIDGE |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE ABOVE. |
| | ZONING 8.19 - [SATISFIED] ADA SPACES RELOCATED TO |
| | APPROPRIATE ELEVATOR CORRIDORS. |
| | |
| | C) IS THE INTENTION FOR GENERAL PUBLIC WITH ADA NEEDS |
| | TO ACCESS REST OF SITE/RETAIL VIA ELEVATORS THROUGH THE |
| | RESIDENTIAL TOWERS? |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE ABOVE |
| | ZONING 8.19 - [NOT SATISFIED] GENERAL PATRONS OF THE |
| | SITE (OFFICE, HOTEL, VISITORS) WITH ADA NEEDS THAT PARK |
| | ON FLOORS 3-8 DO NOT HAVE SPACES ADJACENT TO |
| | NON-RESIDENTIAL ELEVATORS AND CORRIDORS. REDISTRIBUTE |
| | OR INCLUDE SPACES IN THE AREAS SIMILAR TO LEVEL 2. |
| | |
| | GROUND LEVEL, THE ADA VAN SPACE AT THE END OF THE ROW |
| | FORCES USERS TO WALK BEHIND OTHER PARKED CARS TO ACCESS |
| | DOORS TO BIKEROOM/OUTSIDE. ADA CODE LANGUAGE MORE |
| | RESTRICTIVE THAN ZONING PROVISION. THIS SPACE IS NOT |
| | COMPLIANT AND WILL NEED TO BE RELOCATED / REMOVED FROM |
| | HOW IT IS CURRENTLY SHOWN. |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE ABOVE |
| | ZONING 8.19 - [SATISFIED] ADA PATH/CORRIDOR PROVIDED |
| | IN FRONT OF SPACES. |
| | |
| | D) GROUND ITC ADA PATH FOR VANS, NOT THE CLOSEST /MOST |
| | EFFICIENT OR DIRECT ACCESS TO REST OF SITE, ONLY |
| | BENEFITS RETAIL SPACES ALONG THE CSX FRONTAGE. BETTER |
| | DISTRIBUTION WOULD BE AROUND UPPER LEVEL ELEVATOR |
| | SHAFTS. |
| | V. PLEASE PROVIDE PARKING PAINTED STRIPING DETAILS THAT |
| | MEET THE CITY STANDARDS OF SEC. 94-485. [PLANS AMENDED |
| | TO INCLUDE DETAILS] [SATISFIED] |
| | VI. PLEASE PROVIDE ALL PARKING DIMENSION FOR DRIVE |
| | ISLES PARKING RAMPS SLOPES, PARKGIN STALL ETC. {PLANS |
| | AMENDED TO INCLUDE DETAIL AND DIMENSIONS][SATISFIED] |
| | |
| | K. PARKING STRUCTURE RAMP SLOPES: INTERNAL RAMPS APPEAR |
| | 15.8% AND 12.4%. PER SEC. 94-111 (Q.)(2.) IF THE RAMP S |
| | GREATER THAN 14 PERCENT, A BREAK-OVER TRANSITION SHALL |
| | BE REQUIRED. [TYPICAL CODE COMPLAINT DIMENSIONS |
| | PROVIDED. RAMP SLOPE AMENDED TO PROVIDE COMPLAINT SLOPE |
| | OR BREAK-OVER TRANSITION] [SATISFIED] |
| | |
| | L. INTERNAL PARKING STRUCTURE POSES CONCERNS WITH |
| | INGRESS / EGRESS OF RESIDENTS, EMPLOYEES, VISITORS, AND |
| | THE OPERATIONS OF LOADING AND BICYCLE USERS. LOADING |
| | SPACES AND BAYS ARE INEFFICIENT AND CAUSE CONFLICT |
| | ZONES/SAFETY CONCERNS. POTENTIAL SPILLBACK AND QUEUING |
| | ISSUES ONTO CLEARWATER. [WE DISAGREE. LOADING AND |
| | ACCESS IS EFFICIENT AND MEETS CODE THE CONCEPT TO |
| | CREATE A SINGULAR GARAGE TO SERVE THE ENTIRE |
| | DEVELOPMENT AS A TRANSIT FACILITY. THE IDEA IS TO NOT |
| | PARK THE SITE AS A TYPICAL DEVELOPMENT WITH GARAGES |
| | PROVIDED IN EACH BUILDING BUT RATHER A MORE URBAN |
| | CONCEPT THAT PARKS CARS CENTRALLY TO THE DEVELOPMENT |
| | WITH PATRONS AND RESIDENTS WALKING THE SHORT DISTANCE |
| | TO AND FROM THE INTENDED END USE] [NOT SATISFIED] |
| | PLEASE PROVIDE JUSTIFICATION FOR DOUBLE INGRESS RAMP |
| | AND DOUBLE EGRESS RAMP. |
| | |
| | TV JULY 19TH RESPONSE: THE CODE REQUIRES ALL TRAFFIC |
| | MOVEMENTS, INCLUDING STACKING, TO BE INTERNALIZED. THE |
| | CODE DOES NOT PROHIBIT OR REGULATE THE NUMBER OF LANES. |
| | THE TWO LANES ARE REQUIRED TO HANDLE THE CAPACITY OF |
| | THE GARAGE AND SO AS TO MINIMIZE STACKING ON |
| | CLEARWATER. THERE ARE SEVERAL EXAMPLES OF DUAL RAMPS ON |
| | LARGER PROJECTS WITHIN THE CITY (I.E. KRAVIS CENTER, |
| | PHILLIPS POINT). THE APPLICANT HAS MODIFIED THE PLANS |
| | TO TAPER THE DUAL UP RAMP TO ONE LANE PRIOR TO VEHICLES |
| | GETTING TO LEVEL 02. WE HAVE ALSO INCORPORATED A LANE |
| | SEPARATOR AS REQUESTED. (SEE SHEET A1-01) |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | GROUND LEVEL LOADING BAYS AND OPERATION CREATES CLEAR |
| | CONFLICT POINTS AND IS A TRAFFIC / SAFETY HAZARD WITH |
| | INGRESS/EGRESS OF PATRONS TO THE UPPER LEVELS OF THE |
| | GARAGE AND GROUND LEVEL ADA ACCESS. QUEUING AND |
| | SPILLBACK IS AN INEVITABILITY DURING OPERATIONAL HOURS. |
| | |
| | TV JULY 19TH RESPONSE: A DOCK MANAGEMENT PLAN WILL BE |
| | PROPOSED AND A DOCK MASTER WILL BE ON SITE TO CONTROL |
| | TRAFFIC WHEN DELIVERY OR ADA VEHICLES ENTER THE LOADING |
| | AREA. |
| | ZONING 8.19 - [PARTIALLY SATISFIED] PLEASE PROVIDE THIS |
| | PLAN OR OPERATIONS DETAIL TO PLANNING & CITY TRAFFIC |
| | ENGINEERS PRIOR TO SITE PLAN APPROVAL. |
| | |
| | AUTOTURN FOR DELIVERIES POSES CONFLICT POINTS WITH ADA |
| | AND OTHER OPERATIONS, INTERSECTS WITH DOWNWARD RAMP. |
| | |
| | TV JULY 19TH RESPONSE: A NEW AUTO TURN STUDY IS |
| | PROVIDED AND THE PLANS HAVE BEEN AMENDED TO ELIMINATE |
| | THE CONFLICT POINT AT THE END OF THE DOWN RAMP (SEE |
| | SHEET C-18) ALSO SEE ABOVE. |
| | [SATISFIED] |
| | |
| | INTERNAL GARAGE CIRCULATION ALTERNATING ACROSS LEVELS |
| | WITH ONE-WAY/ TWO WAY AISLES POSES CONCERNS |
| | |
| | TV JULY 19TH RESPONSE: THIS IS NECESSARY BECAUSE THE |
| | RAMPING TO LEVEL 02 ARE BEING MERGED TO ONE LANE AND |
| | ABOVE LEVEL 02 THERE ARE INTERNAL TWO WAY (SINGLE LANE) |
| | RAMPS TO ACCESS PARKING ABOVE. TWO LANES GOING UP TO |
| | LEVEL 02 ARE NECESSARY TO AVOID STACKING ON CLEARWATER. |
| | IN ORDER TO CONTROL TURNING MOVEMENTS AND TO ELIMINATE |
| | INTERSECTION CONFLICT ON LEVEL 02, THE TWO LANES HAVE |
| | PREVIOUSLY MERGE INTO ONE LANE. A DIAGRAM SHOWING THE |
| | TRAFFIC FLOW IS SHOWN ON SHEET A1-01, A1-02, A1-03, |
| | A1-04 AND A1-05. |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | IS THE INTENTION FOR GENERAL PUBLIC TO ACCESS REST OF |
| | SITE/RETAIL VIA ELEVATORS THROUGH THE RESIDENTIAL |
| | TOWERS? |
| | |
| | REPEAT COMMENT OF (9.J. IV.A.) PLEASE PROVIDE |
| | CLARIFICATION OF HOW GENRAL PUBLIC / USERS OF OFFICE, |
| | HOTEL RETAIL A GENERAL PUBLIC / USERS OF OFFICE HOTEL, |
| | RETAIL, AND TRIRAIL USERSWILL EFFIECNTELY ACCESS THESE |
| | FACILITIES FROM THE CENTRALLY LOCATED GARAGE. |
| | |
| | TV JULY 19TH RESPONSE: WE DO NOT ANTICIPATE ANY ACCESS |
| | THROUGH THE RESIDENTIAL TOWER. THE INTENT IS FOR SFRTA |
| | AND THEIR ADA PATRONS TO ACCESS THE FACILITY FROM THE |
| | ELEVATOR CORES LOCATED IN THE SOUTHWEST CORNERS OF THE |
| | GARAGE OR FROM THE DESIGNATED HC VAN ACCESSIBLE SPACES |
| | ON THE GROUND FLOOR. THE PLANS HAVE BEEN AMENDED TO |
| | RELOCATE THE ADA SPACES CLOSER TO THE ELEVATOR AND SHOW |
| | THE LOCATION OF THE MOST CONVENIENT ADA SPACES WITH THE |
| | SHORTEST ROUTES TO ACCESS THE GROUND FLOOR AND OTHER |
| | USES ON SITE. THE GENERAL PUBLIC MAY ALSO ACCESS THE |
| | PLAZA THROUGH THE EASTERN STAIRWAY, GARAGE ELEVATORS OR |
| | FROM THE PROMINENT SPIRAL STAIRWAY AND ELEVATOR TO THE |
| | PLAZA. |
| | ZONING 8.19 - [PARTIALLY SATISFIED] REPEAT COMMENT FROM |
| | 4.(C.) GENERAL PATRONS OF THE SITE (OFFICE, HOTEL, |
| | VISITORS) WITH ADA NEEDS THAT PARK ON FLOORS 3-8 DO NOT |
| | HAVE SPACES ADJACENT TO NON-RESIDENTIAL ELEVATORS AND |
| | CORRIDORS. REDISTRIBUTE OR INCLUDE SPACES IN THE AREAS |
| | SIMILAR TO LEVEL 2. |
| | |
| | M. THE PARKING GARAGE SHOULD BE PREWIRED FOR EV |
| | CHARGERS BOTH FOR RESIDENTS AND CUSTOMERS. THE |
| | ELECTRICAL ROOMS NEED TO BE PROVIDED WITH SUFFICIENT |
| | SPACE TO ACCOMMODATE THE REQUIRED ELECTRICAL PANELS AND |
| | AREAS NEED TO BE DESIGNATED FOR THE TRANSFORMERS. |
| | [ACKNOWLEDGED] [PARTIALLY SATISFIED] IF YOU PLAN TO |
| | PROVIDE EV SPACES AT THIS TIME, PLEASE SHOW WHERE THESE |
| | ARE LOCATED. |
| | |
| | TV JULY 19TH RESPONSE: THIS IS NOT CODE REQUIREMENT; |
| | HOWEVER, WE ANTICIPATE HAVING SUBSTANTIAL EV CHARGING |
| | CAPABILITY AND WILL INSURE THAT ELECTRICAL CAPACITY IS |
| | SUFFICIENT AND WILL PROVIDE CONDUITS. THE EV TOTALS AND |
| | LOCATION WILL BE DETERMINED AFTER AMENDED SITE PLAN |
| | APPROVAL BASED ON MARKET CONDITIONS AND PROVIDED IN TV |
| | CONSTRUCTION DRAWINGS. |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | 10. CURB-CUTS AND PASSENGER LOAD/DROP-OFF: PER SEC. |
| | 94-111 TABLE IV-11 TOD DOES NOT PERMIT ON-STREET AND/OR |
| | PASSENGER DROP-OFF OR LOADING ON AVENUE (BANYAN). [ONE |
| | CURB CUT HAS BEEN REMOVED FROM THE BANYAN. ALL OTHER |
| | CURB CUTS AND PASSENGER PICK UP LOCATIONS HAVE BEEN |
| | PREVIOUSLY APPROVED IN THEIR RESENT LOCATIONS. ONE AND |
| | ONE PASSENGER DROP OFF CURB CUT WAS REMOVED ON BANYAN] |
| | [NOT SATISFIED] BASED UPON THE RESUBMITTED DOCUMENTS: |
| | [REPEAT COMMENT] PROPOSED RESIDENTIAL ON-STREET DROP |
| | OFF ON BANYAN FRONTAGE NOT PERMITTED WITHIN TOD-25 |
| | DISTRICT. |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE RESPONSE ABOVE |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | THERE ARE NO VESTED/CARRIED OVER APPROVALS, THIS IS A |
| | NEW SITE PLAN/PROJECT. PER SECTION 94-111 TABLE IV-11: |
| | ON-STREET PASSENGER LOADING AND DROP-OFF IS NOT |
| | PERMITTED WITHIN THE TOD DISTRICT ALONG AVENUE STREET |
| | CLASSIFICATIONS (BANYAN BOULEVARD). |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE RESPONSE ABOVE |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | ADDITIONALLY, THE PROPOSED DROP-OFF DIRECTLY CONFLICTS |
| | WITH THE NEW BANYAN STREETSCAPE. |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE RESPONSE ABOVE |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | CURB-CUT ON BANYAN FOR NONCOMPLIANT PASSENGER DROP-OFF |
| | IS STILL SHOWN ON ALL RESUBMITTED SITE PLANS, LANDSCAPE |
| | PLANS, AND ENGINEERING PLANS. |
| | |
| | STAFF DOES NOT SUPPORT THE RESIDENTIAL DROP-OFF FOR |
| | THE MIDDLE RESIDENTIAL TOWER ALONG CLEARWATER. PROPOSED |
| | DOES NOT MAKE SIENSE OPRATIONALLY AND DOPES NOPT |
| | REFLECT A SAFE PLEASANT PEDESTRIAN ENVIRONMENT OR BUILT |
| | UP URBAN CONTEXT. CREATES A VEHICULAR-FOCUSED SPACE |
| | WITH NARROW LANDSCAPE BUFFER, PEDESTRIANS ARE BOUNDED |
| | BY 2 TRAVEL LANES. BUILDING WOULD BE BETTER ORIENTED |
| | CLOSER TOWARD CLEARWATER DR. ACTIVATING THE FRONTAGE, |
| | WITH THE DROP-OFF LOCATED AT THE REAR OF THE BUILDING, |
| | IN PLACE OF OR ALONG THE PROPOSED LOADING AREA. |
| | PROVIDES THE MOST DIRECT ROUTE INTO THE GARAGE FOR |
| | VALET SERVICES AND AVOIDS ADDITIONAL CIRCULATION. |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE RESPONSE ABOVE ALSO |
| | TV HAS REVISED THE CIRCULATION TO ELIMINATE THE WESTERN |
| | OUTSIDE DRIVE LANE TO ACCOMMODATE THIS COMMENT AND |
| | REPLACED IT WITH LANDSCAPED IMPROVEMENTS (SEE SHEET |
| | A1-01). |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | A TYPE A PORTE-COCHERE OFF CLEARWATER IS MORE |
| | COMPATIBLE AND APPROPRIATE FOR THIS SPACE, IF A |
| | DROP-OFF IS NEEDED ALONG THE RESIDENTIAL FRONTAGE. |
| | SIMILAR TO EXISTING ITC DROP- OFF IN FRONT OF THE HOTEL |
| | OFFICE. |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE RESPONSE ABOVE WE |
| | HAVE ALSO REVISED THE PLAN TO HAVE LOBBY ENTRANCES BOTH |
| | FACING CLEARWATER AND EASTERN INTERNAL DRIVE WITH A |
| | DROP-OFF ON THE EASTERN SIDE OF THE RESIDENTIAL TOWER |
| | (SEE SHEET A1-01). |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | THE NUMBER OF ACCESS POINTS ONTO EACH RIGHT OF WAY |
| | EXCEEDS THE 2 PERMIITED VIA SEC. 94-312 AND NO PROPERTY |
| | SHALL HAVE A TOTAL OF MORE THAN 4 ACCESS POINTS. WILL |
| | REQUIRE AN ADDITIONAL VARIANCE REQUEST. |
| | |
| | TV JULY 19TH RESPONSE: THIS SITE INCORPORATES ACCESS |
| | (DROP-OFF AND PICK-UP POINTS FOR PALM TRAN, TRI-RAIL |
| | AND AMTRAK AS WELL AS THE TV DEVELOPMENT AND WERE PART |
| | OF THE PREVIOUSLY APPROVED SITE PLAN, NEVERTHELESS, TV |
| | WILL SEEK VARIANCES FOR EACH OF THESE ACCESS POINTS TO |
| | REMAIN AS INDICATED ON THE AMENDED SITE PLAN. |
| | ZONING 8.19 - [SATISFIED] REQUESTED VARIANCE |
| | |
| | WIDTH OF CURB-CUT BETWEEN RESIDENTIAL TOWERS EXCEEDS |
| | PERMITTED 25 FT APPEARS TO BE 30 FEET PLEASE PROVIDE |
| | DIMENSIONS OF ALL CURB CUTS / DRIVE ACCESS |
| | |
| | RESPONSE: THE PLANS HAVE BEEN AMENDED TO SHOW THE |
| | DIMENSIONS OF THE CURB CUT (SEE SHEETS C-10 AND C-11) |
| | AS THESE ARE RADIAL DRIVEWAYS DUE TO BUSES AND DELIVERY |
| | VEHICLES ACCESSING THE SITE AS WELL AS THE NUMBER OF |
| | TRIPS UTILIZING THE DRIVEWAYS, THE WIDTHS ARE WIDER |
| | THAN THE 25? REQUIREMENT AT THE RIGHT-OF-WAY LINE. THE |
| | CITY STANDARD FLARED DRIVEWAY IS NOT APPROPRIATE AT |
| | THESE LOCATIONS. ACCORDINGLY, WE WILL BE APPLYING FOR A |
| | VARIANCE FOR THESE CURB CUTS. |
| | ZONING 8.19 - [PARTIALLY SATISFIED] REQUESTED VARIANCE. |
| | THANK YOU FOR PROVIDING DIMENSIONS ON SHEETS C-10 AND |
| | C-11. TO CLARIFY, CURB CUT WIDTH IS CALCULATED FROM THE |
| | INTERSECTION OF THE DRIVEWAY WITH THE PROPERTY LINE, |
| | NOT NECESSARILY THE RADIUS OR INTERNAL THROAT WIDTH OF |
| | THE DRIVEWAY. PLEASE BE SURE TO SPECIFY THE DIMENSION |
| | ACROSS THE PROPERTY-LINE WITHIN THE VARIANCE REQUESTS. |
| | |
| | WIDTH OF CURB-CUT BETWEEN RESIDENTIAL TOWER AND |
| | HOTEL/OFFICE TOWER EXCEEDS PERMITTED 25FT. APPEARS TO |
| | BE 30 FT. + PLEASE PROVIDE DIMENSIONS OF ALL CURB |
| | CUTS/DRIVE ACCESS. |
| | |
| | TV JULY 19TH RESPONSE: PLANS HAVE BEEN AMENDED TO SHOW |
| | THE DIMENSIONS OF THE CURB CUT (SEE SHEETS C-10 AND |
| | C-11) REQUIRED VARIANCES WILL BE REQUESTED. |
| | |
| | WIDTH OF CURB-CUTS FOR THE ITC BUS LOOP EXCEEDS |
| | PERMITTED 25 FT. INGRESS WIDTH NEARLY 60 FT. EGRESS |
| | APPROXIMATELY 40-45FT. PLEASE PROVIDE DIMENSIONS OF ALL |
| | CURB CUTS/DRIVE ACCESS. |
| | |
| | TV JULY 19TH RESPONSE: PLANS HAVE BEEN AMENDED TO SHOW |
| | DIMENSIONS OF THE PROPOSED CURB CUT/DRIVE ACCESS AND IS |
| | 58.16 FEET FOR THE INGRESS AND 50.25 FEET FOR THE |
| | EGRESS. THESE OPENINGS WERE PART OF THE COUNTY?S |
| | APPROVED ITC SITE PLANS. REQUIRED VARIANCES WILL BE |
| | REQUESTED |
| | ZONING 8.19 - [PARTIALLY SATISFIED] REQUESTED VARIANCE. |
| | THANK YOU FOR PROVIDING DIMENSIONS ON SHEETS C-10 AND |
| | C-11. TO CLARIFY, CURB CUT WIDTH IS CALCULATED FROM THE |
| | INTERSECTION OF THE DRIVEWAY WITH THE PROPERTY LINE, |
| | NOT NECESSARILY THE RADIUS OR INTERNAL THROAT WIDTH OF |
| | THE DRIVEWAY. PLEASE BE SURE TO SPECIFY THE DIMENSION |
| | ACROSS THE PROPERTY-LINE WITHIN THE VARIANCE REQUESTS. |
| | |
| | WIDTH OF CURB-CUTS FOR THE GARAGE INGRESS/EGRESS |
| | EXCEEDS PERMITTED 25 FT. WIDTH NEARLY FT. PLEASE |
| | PROVIDE DIMENSIONS OF ALL CURB CUTS/DRIVE ACCESS. |
| | |
| | TV JULY 19TH RESPONSE: PLANS HAVE BEEN AMENDED TO SHOW |
| | THESE DIMENSIONS. REQUIRED VARIANCES WILL BE REQUESTED. |
| | ZONING 8.19 - [PARTIALLY SATISFIED] REQUESTED VARIANCE. |
| | THANK YOU FOR PROVIDING DIMENSIONS ON SHEETS C-10 AND |
| | C-11. TO CLARIFY, CURB CUT WIDTH IS CALCULATED FROM THE |
| | INTERSECTION OF THE DRIVEWAY WITH THE PROPERTY LINE, |
| | NOT NECESSARILY THE RADIUS OR INTERNAL THROAT WIDTH OF |
| | THE DRIVEWAY. PLEASE BE SURE TO SPECIFY THE DIMENSION |
| | ACROSS THE PROPERTY-LINE WITHIN THE VARIANCE REQUESTS. |
| | |
| | PLEASE PROVIDE AUTO-TURN ANALYSIS FOR THE ITC/BUS LOOP |
| | OPERATION. |
| | |
| | TV JULY 19TH RESPONSE: TRANSIT VILLAGE IS NOT MAKING |
| | ANY CHANGES TO THE ITC/BUS LOOP OPERATION AND IT IS NOT |
| | UNDER TRANSIT VILLAGE CONTROL. |
| | ZONING 8.19 - [ACKNOWLEDGED] TRANSIT VILLAGE IS MAKING |
| | CHANGES; THE LOCATION, CONFIGURATION, AND SIZE OF THE |
| | INGRESS/EGRESS FOR THE ITC/BUS LOOP IS CHANGING FROM |
| | THE EXISTING CONDITIONS. HOWEVER SINCE ITC/SFRTA IS IN |
| | CONTROL, OPERATIONS LOGISTICS SHALL BE ASSESSED BY |
| | THOSE ENTITIES. |
| | |
| | 11. PLEASE PROVIDE AN FAR AND GBA DIAGRAM SHOWING THE |
| | BREAKDOWN OF THE PROJECT?S COUNTED/UNCOUNTED ROOMS AND |
| | SPACES. [PLANS UPDATED TO PROVIDE FAR GBA DIAGRAMS) |
| | |
| | A. GROSS BUILDING AREA MEANS THE TOTAL FLOOR AREA OF A |
| | BUILDING, INCLUDING AIR-CONDITIONED OR FULLY ENCLOSED |
| | STORAGE SPACES, ENCLOSED AREAS ON THE ROOFTOP, SUCH AS |
| | BATHROOMS AND LOBBIES, STAIRS .AND ELEVATOR AREAS, AND |
| | EXTERNAL UNENCLOSED CIRCULATION AREAS. THE GROSS |
| | BUILDING AREA DOES NOT INCLUDE PARKING AREAS; |
| | UNENCLOSED COLONNADES, PORCHES AND BALCONIES; |
| | MECHANICAL AND ELECTRICAL SPACES; AND TRASH ROOMS. |
| | STORAGE SPACES WITHOUT WINDOWS AND ENCLOSED BY SURFACES |
| | THAT ALLOW FOR NATURAL VENTILATION OR OUTSIDE AIR |
| | CIRCULATION SHALL NOT BE INCLUDED. [ACKNOWLEDGED] [NOT |
| | SATISFIED] GROUND LEVEL A6-01, ENCLOSED BIKE STORAGE |
| | ROOM COUNTS TOWARD GBA/FAR. |
| | |
| | TV JULY 19TH RESPONSE: GBA CALCULATION UPDATED TO |
| | INCLUDED BIKE ROOM AREA (SEE TABULAR SHEET A0-02) |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | VII. GROSS BUILDING AREA REQUIREMENTS: |
| | |
| | 1. ANY PORTION OF THE PARKING AREA WHICH EXCEEDS THE |
| | MAXIMUM PARKING RATIO SHALL BE INCLUDED IN THE |
| | CALCULATIONS OF GROSS BUILDING AREA. THIS SHALL INCLUDE |
| | STALLS AND ALL ASSOCIATED CIRCULATION AREAS. [PROJECT |
| | PARKING PROVIDED IS WITHIN THE MINIMUM AND MAXIMUM |
| | RANGE PERMITTED AND DOES NOT COUNT TOWARD GBA OR THE |
| | FAR CALCULATIONS] [SATISFIED] |
| | 2. PARKING LOCATED BELOW GRADE SHALL NOT BE COUNTED AS |
| | PART OF THE GROSS BUILDING AREA. [ACKNOWLEDGED] |
| | [SATISFIED] |
| | 3. THE GROSS BUILDING AREA SHALL BE MEASURED FROM THE |
| | OUTSIDE FACE OF EXTERIOR WALLS. [ACKNOWLEDGED] |
| | [SATISFIED] |
| | |
| | 12. PLEASE PROVIDE ACTIVE USE DIAGRAM AND CALCULATIONS |
| | FOR SITE FRONTAGES. [ACTIVE USE DIAGRAM PROVIDED ON |
| | REVISED PLANS] [SATISFIED] |
| | ZONING 8.19 - [NOT SATISFIED] BASED UPON RESUBMITTED |
| | AND REVISED PLANS; PLEASE NOTE ACTIVE USE REQUIREMENT |
| | ALONG CLEARWATER (SECONDARY) IS 30% OF THE BUILDABLE |
| | LOT FRONTAGE, NOT 30% OF EACH BUILDING?S FRONTAGE. |
| | PLEASE RECALCULATE ACTIVE USE AS A PERCENTAGE OF THE |
| | WHOLE CLEARWATER FRONTAGE/PROPERTY LINE. ALSO, NOTE IN |
| | THOSE CASES WHERE PUBLIC OPEN SPACE IS PROVIDED ALONG |
| | THE FRONTAGE LINE, THE OPEN SPACE MAY BE COUNTED AS |
| | ACTIVE USE AS LONG AS ACTIVE USES ARE PROVIDED ON THE |
| | FIRST FLOOR OF THE BUILDING ADJOINING THE PUBLIC OPEN |
| | SPACE. ON SHEET A0-06 PLEASE ADJUST CALCULATIONS TO |
| | REFLECT ACTIVE USE OF THE ENTIRE CLEARWATER FRONTAGE IN |
| | TOTAL (I.E. PROVIDE AT LEAST 30% OF THE APPROX. 1,400 |
| | FT. PROPERTY LINE; NEED TO HAVE APPROX. 420 FT. OF |
| | ACTIVE USE.) |
| | |
| | BANYAN (AVENUE) ACTIVE USE REQUIREMENT IS 60% OF THE |
| | BUILDABLE LOT FRONTAGE, NOT 30% OF THE BUILDING?S |
| | FRONTAGE. PLEASE RECALCULATE ACTIVE USE AS A PERCENTAGE |
| | OF THE WHOLE BANYAN FRONTAGE/PROPERTY LINE. ALSO, NOTE |
| | IN THOSE CASES WHERE PUBLIC OPEN SPACE IS PROVIDED |
| | ALONG THE FRONTAGE LINE, THE OPEN SPACE MAY BE COUNTED |
| | AS ACTIVE USE AS LONG AS ACTIVE USES ARE PROVIDED ON |
| | THE FIRST FLOOR OF THE BUILDING ADJOINING THE PUBLIC |
| | OPEN SPACE. ON SHEET A0-06 PLEASE ADJUST CALCULATIONS |
| | TO REFLECT ACTIVE USE OF THE ENTIRE BANYAN FRONTAGE IN |
| | TOTAL (I.E. PROVIDE AT LEAST 60% OF THE APPROX. 375 FT. |
| | PROPERTY LINE; NEED TO HAVE APPROX. 225 FT. OF ACTIVE |
| | USE.) |
| | |
| | THE MIN. REQUIRED LINEAR LENGTH OF ACTIVE USE APPEARS |
| | TO MEET THE REQUIREMENTS, BUT PLEASE ILLUSTRATE AND |
| | RECALCULATE THE TABULAR VALUES/PERCENTAGES TO BE SURE. |
| | |
| | 13. IT APPEARS THAT THE ELEVATION DRAWINGS DO NOT MATCH |
| | THE GROUND LEVEL SITE PLAN. THE ELEVATION DRAWINGS MUST |
| | INCLUDE HORIZONTAL DIMENSIONS FOR THE VARIOUS FEATURES |
| | SO THAT STAFF CAN VERIFY THAT THE ELEVATIONS MATCH THE |
| | SITE PLAN BUT ALSO THAT THE SITE FRONTAGES COMPLY WITH |
| | THE VARIOUS ZONING REQUIREMENTS. [CHECKED FOR ACCURACY |
| | AND REVISE AS NEEDED] [NOT SATISFIED] AN EXAMPLE ON |
| | SHEET A2-01 DETAIL ON THE HOTEL/OFFICE TOWER SHOWS A |
| | SUPPORT COLUMN NOT ILLUSTRATED WITHIN THE SITE PLANS. |
| | ADDITIONAL COLUMN SHOWN IN ELEVATION ADJACENT TO THE |
| | SPIRAL STAIRCASE FEATURE, NOT SHOWN IN SITE PLAN. |
| | ADDITIONALLY, PLEASE PROVIDE ALL ENTRANCES, DOORS, ETC. |
| | ON GROUND-LEVEL SO STAFF CAN VERIFY ELEMENTS MATCH SITE |
| | PLAN. ALL PLANS NEED TO SHOW CONSISTENT AND ACCURATE |
| | INFORMATION. |
| | |
| | TV JULY 19TH RESPONSE: THE PLANS HAVE BEEN REVISED TO |
| | PROVIDE THE REQUESTED ADDITIONAL DETAIL, SETBACKS, AND |
| | DIMENSIONS ADDED TO PROVIDE CLARITY. |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | 14. PLEASE SPECIFY THE TYPE OF OPEN SPACES (PRIVATE& |
| | PUBLIC) PROVIDED ON THE DRAWINGS, REFERENCE SEC. 94-109 |
| | AND TABLE IV?7. CLARIFY HOW THE REQUIREMENTS OF EACH |
| | OPEN SPACE TYPE IS MET WITHIN THE LANDSCAPE DRAWINGS. |
| | [TYPE OF OPEN SPACES HAVE BEEN PROVIDED ON THE |
| | LANDSCAPE CALCULATIONS SHEET.] |
| | |
| | THANK YOU FOR PROVIDING OPEN SPACES AND CALCULATIONS |
| | SHEET, BASED ON WHAT WAS SUBMITTED: |
| | |
| | [NOT SATISFIED] PUBLIC OPEN SPACE ON CORNER OF |
| | CLEARWATER & BANYAN LABELED AS COURTYARD, THIS TYPE OF |
| | PUBLIC SPACE IS NOT PERMITTED IN TOD-25 DISTRICT. |
| | GARDEN COURTYARD CLASSIFICATION IS PERMITTED. (TABLE |
| | -IV-6) |
| | ZONING 8.19 - [NOT SATISFIED] SHEET A0-04, A0-05, |
| | A1-01, A4-02, L110 SHOWS SPACE STILL LABELED |
| | INCORRECTLY AS A COURTYARD, PLEASE COORDINATE ALL PLAN |
| | SETS ARCH, CIVIL, AND LANDSCAPE TO MATCH AND BE |
| | CONSISTENTLY LABELED. CALCULATIONS FOR GARDEN COURTYARD |
| | ON SHEET L005 APPEAR TO BE CORRECT, SATISFY. SHEET L002 |
| | LABELS VEGETATED AREA UNDER GARDEN PLAZA (LEVEL 01 OPEN |
| | SPACE), THERE IS NO GARDEN PLAZA PRESENTED ON GROUND |
| | LEVEL. REQUIREMENT FOR VEGETATED AREA IS 50% NOT 25%. |
| | ON SHEET L002 THE VEGETATED AREA NEEDS TO BE CALCULATED |
| | PER DESIGNATED OPEN SPACE (I.E. OPEN SPACE 1A NEEDS |
| | 50%, 1B NEEDS 50%, 4A NEEDS 20%, ETC.) PLEASE MAKE SURE |
| | EACH INDIVIDUAL SPACE MEETS ITS REQUIREMENTS. |
| | |
| | SHEET L002 (LANDSCAPE CALCULATIONS) MISLABELED |
| | COURTYARD IS ON GROUND LEVEL, GARDEN PLAZA IS ON 2ND |
| | LEVEL, CHECK SF DIMENSIONS. GARDEN PLAZA HAS A MINIMUM |
| | 50% VEGETATED AREA, GARDEN COURTYARD HAS A MINIMUM 50% |
| | VEGETATED. |
| | ZONING 8.19 - REPEAT PREVIOUS COMMENT |
| | |
| | GARDEN PLAZA HAS A MINIMUM 50% TREE CANOPY, GARDEN |
| | COURTYARD HAS A MINIMUM 50% TREE CANOPY. |
| | ZONING 8.19 - REPEAT PREVIOUS COMMENT |
| | |
| | SPECIFY SEATING REQUIREMENTS AND HOW THEY ARE MET |
| | WITHIN THE PROPOSED PUBLIC OPEN SPACES. L005 (GROUND |
| | LEVEL OPEN SPACE PLAN) OPEN SPACE 1A, 1 B, 1C LABELED |
| | AS COURTYARD, THIS TYPE OF PUBLIC SPACE IS NOT |
| | PERMITTED IN TOD-25 DISTRICT. GARDEN COURTYARD |
| | CLASSIFICATION IS PERMITTED (TABLE IV-6). |
| | ZONING 8.19 - REPEAT PREVIOUS COMMENT |
| | SEATING CALCULATIONS FOR GARDEN COURTYARD ON SHEET L005 |
| | APPEARS TO BE CORRECT, SATISFY. |
| | |
| | ACTIVE USE ABUTMENT FOR GARDEN COURTYARD IS 2 SIDES OR |
| | 75%. ROW ABUTMENT FOR GARDEN COURTYARD IS 1 SIDE OR |
| | 20%. |
| | ZONING 8.19 - REPEAT PREVIOUS COMMENT |
| | ACTIVE USE ABUTMENT CALCULATIONS FOR GARDEN COURTYARD |
| | ON SHEET L005 APPEARS TO BE CORRECT, SATISFY. |
| | |
| | OPEN SPACE 2A ON SHEET L005 (GROUND LEVEL OPEN SPACE |
| | PLAN) IS INCORRECTLY LABELED AS INTERIOR COURTYARD, |
| | THIS IS A PRIVATE OPEN SPACE CLASSIFICATION AND IS NOT |
| | PERMITTED WITHIN TOD-25 SUBDISTRICT. PLEASE IDENTIFY |
| | THE CORRECT TYPE OF PUBLIC OPEN SPACE THIS IS. NOTE |
| | PUBLIC OPEN SPACES ARE TO BE ON THE GROUND LEVEL, WILL |
| | REQUIRE VARIANCE/WAIVER FROM THE DAC. |
| | ZONING 8.19 - IF OPEN SPACE A2 IS NOT COUNTING TOWARD |
| | REQUIRED PRIVATE OR PUBLIC OPEN SPACE, DOES NOT NEED TO |
| | BE SHOWN ON L005. |
| | |
| | OPEN SPACE 4A ON SHEET L005 (GROUND LEVEL OPEN SPACE |
| | PLAN) DOES NOT MEET THE ACTIVE USE ABUTMENT REQUIRED |
| | (1SIDE OR 20%) |
| | ZONING 8.19 - [SATISFIED] RAILROAD ROW COUNTS TOWARD |
| | PUBLIC ROW ABUTMENT/OFFICE/RETAIL SATISFIES ACTIVE USE |
| | ABUTMENT |
| | |
| | OPEN SPACE 4A AND 48 ON SHEET L005 (GROUND LEVEL OPEN |
| | SPACE PLAN) TERRACE VEGETATED AREA REQUIREMENT IS 20% |
| | (OKAY TO EXCEED REQUIREMENT, PLEASE ADJUST TABLE TO |
| | CORRECTLY REFLECT REQUIREMENTS) |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | OPEN SPACE 4A AND 48 ON SHEET L005 (GROUND LEVEL OPEN |
| | SPACE PLAN) SHOULD BE LABELED AS THE REQUIRED ROOFTOP |
| | GARDEN. MINIMUM REQUIREMENTS INCLUDE 50% VEGETATED AREA |
| | AND 50% TREE CANOPY. |
| | ZONING 8.19 - [SATISFIED] 4A AND 4B ARE TERRACES ON |
| | RESUBMITTED PLANS. |
| | |
| | STAFF IS UNABLE TO VERIFY COMPLIANCE UNTIL THE OPEN |
| | SPACES HAVE BEEN CORRECTLY DESIGNATED / IDENTIFIED AND |
| | PROPER REQUIREMTNS LISTED. |
| | ZONING 8.19 - [PARTIALLY SATISFIED] GROUND-LEVEL OPEN |
| | SPACES 1A, 1B, 1C CORRECTLY LABELED. |
| | |
| | ON SHEET L005, ROOF DECK IS NOT THE PROPER LABELING. |
| | ROOFTOP GARDEN IS A REQUIRED PRIVATE OPEN SPACE TYPE ON |
| | TABLE IV-6 FOR TOD-25 DISTRICT. PLEASE RELABEL |
| | ACCORDINGLY, REQUIRES 50% VEGETATED AND 50% TREE |
| | CANOPY. |
| | |
| | A. PROPOSED OPEN SPACE AT THE SOUTHERN TRIANGLE OF THE |
| | ITE DOES NOT MEET PUBLIC OR PRIVATE OPEN SPACE TYPOLOGY |
| | DUE TO LACK OF ABUTMENT TO AN ACTIVE USE [THIS IS A |
| | BONUS OPEN SPACE DESIGNED TO SERVE THE SFRTA AND ITC |
| | CUSTOMERS DURING OPERATING HOURS. THIS AREA ABUTS THE |
| | ACTIVE MASS TRANSIT USE TRAIN PLATFORM AND ITC FACILITY |
| | AND PROVIDES A SPACE FOR CUSTOMERS TO RELAX IN THE |
| | SUNNY LANDSCAPE PARKLIKE AREA WHILE WAITING TO MAKE |
| | THEIR TRANSIT CONNECTIONS.] [NOT SATISFIED] |
| | |
| | PER SECTION 94-109 OPEN SPACE, PRIVATE? IF PRIVATE OPEN |
| | SPACE IS LOCATED ON THE GROUND FLOOR AND LOCATED ALONG |
| | THE LOT FRONTAGE, IT SHALL BE DESIGNED IN COMPLIANCE |
| | WITH THE PUBLIC OPEN SPACE REQUIREMENTS, AND IT SHALL |
| | BE ACCESSIBLE BY THE PUBLIC FOR PUBLIC USE. |
| | |
| | TV JULY 19TH RESPONSE: THE GROUND LEVEL OPEN SPACES |
| | HAVE BEEN RELABELED AS GARDEN COURTYARD (SEE SHEETS |
| | L002 AND L005). THE OPEN SPACE REQUIREMENT IS MET ON |
| | THE GROUND LEVEL (SEE SHEETS L002, L005 AND L006). THE |
| | REMAINING OPEN SPACE IS A BONUS OPEN SPACE AREA AND IS |
| | NOT BEING USED TO MEET THE MINIMUM CODE REQUIREMENTS |
| | FOR REQUIRED OPEN SPACE. |
| | ZONING 8.19 - [SATISFIED] MIN. REQUIREMENTS FOR PUBLIC |
| | OPEN SPACE MET WITH GARDEN COURTYARDS ON 1A, 1B, 1C ON |
| | SHEET L005. |
| | |
| | B. THE PUBLIC OPEN SPACE SHOWN ON THE SECOND LEVEL |
| | REQUIRES THE APPROVAL OF A VARIANCE, SIMILAR TO THE ONE |
| | APPROVED AS PART OF THE CURRENTLY APPROVED SITE PLAN. |
| | [SEE ABOVE] [ACKNOWLEDGED. THIS WOULD ALLOW THE SAME |
| | RAISED OPEN SPACE CONDITION TO OCCUR AS PREVIOUSLY |
| | APPROVED] [NOT SATISFIED] WILL REQUIRE VARIANCE/WAIVER |
| | FROM THE DAC. |
| | |
| | TV JULY 19TH RESPONSE: THIS IS A BONUS OPEN SPACE AREA |
| | AND IS NOT BEING USED TO MEET THE MINIMUM CODE |
| | REQUIREMENTS FOR REQUIRED OPEN SPACE (SEE SHEETS L002, |
| | L005 AND L006). |
| | ZONING 8.19 - [SATISFIED] MIN. REQUIREMENTS FOR PUBLIC |
| | OPEN SPACE MET WITH GARDEN COURTYARDS ON 1A, 1B, 1C ON |
| | SHEET L005. |
| | |
| | 15. STREET TREES: STREET TREES SHALL BE PLANTED AT 30 |
| | FT. INTERVALS ALONG EACH STREET FRONTAGE. CLEARWATER |
| | FRONTAGE SHOULD HAVE APPROX. 46 TREES AND BANYAN |
| | FRONTAGE APPROX. 13 [NOTED STREET TREES CALCULATIONS |
| | HAVE BEEN UPDATED ACCORDINGLY] [SATISFIED] |
| | ZONING 8.19 - [NOT SATISFIED] BASED ON THE CHANGED SITE |
| | CONDITIONS AND PLANS WITHIN THE RESUBMITTED DRAWINGS, |
| | CLEARWATER DR. STREETSCAPE REQUIRES ~10 MORE STREET |
| | TREES ALONG THE SIDEWALK. PLACES TO ADD TREES INCLUDE |
| | ALONG ITC DROP-OFF, IN FRONT OF SPIRAL STAIRCASE, AND |
| | IN FRONT OF RESIDENTIAL LOBBY. |
| | |
| | 16. PROPOSED RESIDENTIAL DROP-OFF AND LOOP FOR |
| | RESIDENTIAL TOWER ON CLEARWATER IS OUTSIDE OF PROPERTY |
| | LINES AND ENCROACHES INTO CITY ROW. ADDITIONAL SMALLER |
| | DROP-OFF ADJACENT TO LOADING BAY /BACK-OF-HOUSE. WHY |
| | ARE THESE DROP-OFF SPACES NEEDED FOR THE RESIDENTIAL |
| | TOWER? ADJACENT HOTEL/OFFICE ALSO INCLUDES A SMALL |
| | DROP-OFF, PRESENTS STACKING/QUEUING ISSUES AND SPILL |
| | OVER INTO CLEARWATER. STAFF DOES NOT SUPPORT THE |
| | RESIDENTIAL DROP-OFF ROAD ADJACENT TO RESIDENTIAL |
| | TOWER/CLEARWATER PROPOSED RESIDENTIAL DROP-OFF NOT IN |
| | COMPLIANCE. ENCROACHES INTO THE PUBLIC RIGHT-OF-WAY AND |
| | PER SEC. 4-111 (N. )(3.) DESIGNATED PASSENGER LOADING |
| | AND DROP-OFF AREAS SHALL BE SET BACK A MINIMUM OF 16 |
| | FEET FROM THE BACK OF CURB, SHALL BE SEPARATED FROM THE |
| | SIDEWALK BY A 5 FOOT WIDE LANDSCAPE BUFFER AND SHALL BE |
| | SUBJECT TO APPROVAL BY THE CITY TRAFFIC ENGINEER. PORTE |
| | COCEHRES ARE SUBJECT TO MINIMUM STANDARDS DEPENDING ON |
| | SUBDISTRICT LOCATION AND ADJACENCY TO A STREET |
| | DESIGNATION AND ARE SEPARATED INTO TWO TYPES WHICH ARE |
| | ILLUSTRATED IN FIGURE IV-22. ONLY A TYPE A PORTE |
| | COCHERE IS ALLOWED IN THE TOD-25 SUBDISTRICT. [THIS |
| | DROP OFF LOOP FEATURE HAS BEEN REVISED AND APPROVED BY |
| | PBC SO THAT IT IS NO LONGER WITHIN THE RIGHT OF WAY AND |
| | ALSO TO ADD EXTRA SPACING FOR A VEGETATED BUFFER AND |
| | DROP OFF RELATED USES.] THANK YOU FOR CONSIDERATIONS |
| | AND REVISIONS FROM THE PREVIOUS SUBMITTAL, BASED UPON |
| | THE NEW PLANS PROVIDED: STAFF DOES NOT SUPPORT THE |
| | RESIDENTIAL DROP OFF FOR THE MIDDLE RESIDENTIAL TOWER |
| | ALONG CLEAR WATER. PROPOSED SEPARATE DROP OFF ROADWAY |
| | DOES NOT MAKE SENSE OPERATIONALLY AND DOES NOT REFLECT |
| | A SAFE / PLEASANT PEDESTRIAN ENVIRONMENT OR BUILT UP |
| | URBAN CONTEXT. CREATES A VEHICULAR-FOCUSED SPACE WITH |
| | NARROW LANDSCAPE BUFFER PEDESTRIANS ARE BOUNDED BY 2 |
| | TRAVEL LANES. BUILDING WOULD BE BETTER ORIENTED CLOSER |
| | TOWARD CLEARWATER DR. ACTIVATING THE FRONTAGE, WITH THE |
| | DROP-OFF LOCATED AT THE REAR OF THE BUILDING, IN PLACE |
| | OF OR ALONG THE PROPOSED LOADING AREA. PROVIDES THE |
| | MOST DIRECT ROUTE INTO THE GARAGE FOR VALET SERVICES |
| | AND AVOIDS ADDITIONAL CIRCULATION. NEW CONFIGURATION |
| | WITH REVERSAL IN DIRECTION NOT EFFICIENT OR OPTIMAL. A |
| | TYPE A PORTE-COCHERE OFF CLEARWATER IS MORE COMPATIBLE |
| | AND APPROPRIATE FOR THIS SPACE, IF A DROP-OFF IS NEEDED |
| | ALONG THE RESIDENTIAL FRONTAGE. SIMILAR TO EXISTING ITC |
| | DROP-OFF IN FRONT OF HOTEL / OFFICE. |
| | |
| | A. INSTEAD, THE BUILDING FRONT SHOULD BE MOVED CLOSER |
| | TO CLEARWATER, AND RECONFIGURE LOADING AND BACK OF |
| | HOUSE TO INCLUDE THE DRIVEWAY AND DROP OFF AREA [SEE |
| | ABOVE COMMENT] SEE ABOVE. |
| | B. SEE ABOVE: PROPOSED LOADING SPACE ON RESIDENTIAL |
| | TOWER DOES NOT FUNCTION FOR VEHICULAR MOVEMENT. LOADING |
| | AREA WAS REVISED TO PROVIDE IMPROVED LOADING VEHICLE |
| | ACCESSIBILITY. SEE SHEET C-03] [NOT SATISFIED] PLEASE |
| | PROVIDE DIMENSIONS OF THE REVISED LOADING SPACES, ADA |
| | SPACE PROPOSED IN BETWEEN LOADING OPERATIONS |
| | |
| | TV JULY 19TH RESPONSE: TV HAS REVISED THE PLANS TO |
| | ELIMINATE THE WESTERN OUTSIDE DRIVE LANE TO ACCOMMODATE |
| | THESE COMMENTS. THERE WILL BE A PEDESTRIAN ENTRANCE |
| | ALONG CLEARWATER AND PEDESTRIAN AND VEHICLE DROPOFF AT |
| | THE REAR OF THE BUILDING. SEE SHEET A4-01 FOR NEW |
| | DESIGN. |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | WHAT IS THE DISTANCE BETWEEN THE INTERSECTION OF |
| | CLEARWATER TO THE REVISED HOTEL/OFFICE DROP-OFF LOADING |
| | SPACE? |
| | |
| | TV JULY 19TH RESPONSE: THE DISTANCE IS 50.88 FEET. |
| | ZONING 8.19 - [SATISFIED] 50FT. MINIMUM MAINTAINED |
| | |
| | 17. ITC BUS LOOP IS NOW ENTIRELY COVERED OVERHEAD BY |
| | PLAZA AND BUILDINGS/STRUCTURES. PREVIOUS DESIGN HAD AN |
| | OPEN AIR CORRIDOR TO PROVIDE LIGHT, LANDSCAPING, AND |
| | VENTILATION / OPEN AIR ACCESS. HOW WILL THE REMOVAL OF |
| | THESE ELEMENTS BE MITIGATED OR COMPENSATED FOR OR TO |
| | PROVIDE LIGHT, LANDSCAPING, AND VENTILATION /OPEN-AIR |
| | ACCESS. HOW WILL THE REMOVAL OF THESE ELEMENTS BE |
| | MITIGATED OR COMPENSATED FOR ESPECIALLY WHERE ANY |
| | MECHANICAL VENTING WILL BE LOCATED? [THE ITC IS NOW |
| | COMPLETELY ENCLOSED UNDER AND WITHIN THE PARKING |
| | STRUCTURE. A NEW LANDSCAPED OPEN SPACE IS PROVIDED |
| | ADJACENT TO THE SOUTH END OF THE ITC. THIS AREA IS |
| | ACCESSIBLE TO TRANSIT PATRONS SO THEY CAN GET SUN OR |
| | SIT IN SHADE WITHIN A LANDSCAPE AREA WHILE WAITING FOR |
| | THEIR TRANSIT CONNECTION] [PARTIALLY SATISFIED] NOTE, |
| | PER SECTION 94-109 OPEN SPACE, PRIVATE ? IF PRIVATE |
| | OPEN SPACE IS LOCATED ON THE GROUND_ FLOOR AND LOCATED |
| | ALONG THE LOT FRONTAGE, IT SHALL BE DESIGNED IN |
| | COMPLIANCE WITH THE PUBLIC OPEN SPACE REQUIREMENTS, AND |
| | IT SHALL BE ACCESSIBLE BY THE PUBLIC FOR PUBLIC USE. |
| | |
| | TV JULY 19TH RESPONSE: THIS IS A BONUS OPEN SPACE AREA |
| | AND IS NOT BEING USED TO MEET THE MINIMUM CODE |
| | REQUIREMENTS. PLEASE NOTE THAT THE ITC IS NOT |
| | COMPLETELY ENCLOSED, AND IS OPEN TO THE EAST, WEST AND |
| | SOUTH. |
| | ZONING 8.19 - [SATISFIED] MIN. REQUIREMENTS FOR PUBLIC |
| | OPEN SPACE MET WITH GARDEN COURTYARDS ON 1A, 1B, 1C ON |
| | SHEET L005. |
| | |
| | 18. PLEASE PROVIDE SHEETS AND DRAWINGS IDENTIFYING HOW |
| | THE FACADE ARTICULATION REQUIREMENTS ARE MET FOR THE |
| | PROJECT. PLEASE REFERENCE SEC. 94-109 AND TABLE IV-4: |
| | FACADE ARCHITECTURAL REQUIREMENTS. [PLANAR BREAKS AND |
| | BUILDING LENGTH DIAGRAMS ARE PROVIDED] [PARTIALLY |
| | SATISFIED] DIAGRAMS ARE PROVIDED A. ILLUSTRATE |
| | TRANSPARENCY CALCULATIONS, FENESTRATION CALCULATIONS, |
| | PLANAR BREAK CALCULATIONS, PROJECTIONS, ETC. FOR ALL |
| | BUILDING FACADES. [TRANSPARENCY, FENESTRATION, PLANAR |
| | BREAK CALCULATIONS, FOR ALL BUILDING FACADES PROVIDED.] |
| | [NOT SATISFIED] FOR GROUND FLOOR TO PODIUM (UP TO 7TH |
| | FLOOR IN TOD-25 DISTRICT |
| | |
| | TV JULY 19TH RESPONSE: THE PLANAR BREAKS DIAGRAMS HAVE |
| | BEEN AMENDED TO SHOW COMPLIANCE SUBJECT TO A VARIANCE |
| | REQUEST FOR GROUND TO LEVEL 7 TO MATCH ARTICULATION OF |
| | TOWER ABOVE (SEE SHEETS A5-04, A5-05, A5-06 AND A5-07). |
| | |
| | ZONING 8.19 - [NOT SATISFIED] PLANAR BREAKS ARE |
| | REQUIRED FOR THE BUILDING FRONTAGES (SIDE FACING STREET |
| | OR ROW) FOR BUILDINGS THAT EXCEED 150 LINEAR FT. THE |
| | REQUIREMENT IS TO PROVIDE A PROJECTION, PROTRUSION, OR |
| | RECESS IN THE FA?ADE THAT IS AT LEAST 3FT. IN DEPTH. |
| | THE CUMULATIVE HORIZONTAL LENGTH OF THE PLANAR BREAKS, |
| | PER BUILDING FRONTAGE, SHALL BE GREATER OR EQUAL TO 20% |
| | OF THE BUILDING FRONTAGE. |
| | |
| | SHEET A5-04 PLANAR BREAK NEEDED FOR 243FT. BANYAN |
| | FRONTAGE (20% HORIZONTAL TOTAL FOR PLANAR BREAK NEEDS |
| | TO BE GREATER THAN OR EQUAL TO 48.5 FT.) |
| | |
| | PLEASE CLARIFY VARIANCE REQUEST, JUSTIFICATION IS |
| | UNCLEAR AS TO WHAT THE VARIANCE IS FROM OR FOR. WHAT |
| | 4FT. PLANAR BREAKS ARE BEING ELIMINATED? BANYAN |
| | FRONTAGE ALSO DOES NOT HAVE A RECESSED GROUND FLOOR. |
| | WHAT TOWERS ARE MIDDLE & WEST? |
| | |
| | |
| | SHEET A5-05 PLANAR BREAK NEEDED FOR 223FT. CLEARWATER |
| | FRONTAGE (20% HORIZONTAL TOTAL FOR PLANAR BREAK NEEDS |
| | TO BE GREATER THAN OR EQUAL TO 44.5 FT.) |
| | |
| | PLEASE CLARIFY VARIANCE REQUEST, JUSTIFICATION IS |
| | UNCLEAR AS TO WHAT THE VARIANCE IS FROM OR FOR. WHAT |
| | 4FT. PLANAR BREAKS ARE BEING ELIMINATED? CLEARWATER |
| | FRONTAGE ALSO DOES NOT HAVE A RECESSED GROUND FLOOR. |
| | WHAT TOWERS ARE MIDDLE & WEST? |
| | |
| | |
| | SHEET A5-06 PLANAR BREAK FOR THE GROUND LEVEL NEEDED |
| | FOR 204?-10?FT. CLEARWATER FRONTAGE (20% HORIZONTAL |
| | TOTAL FOR PLANAR BREAK NEEDS TO BE GREATER THAN OR |
| | EQUAL TO 41 FT.) |
| | |
| | SHEET A5-06 PLANAR BREAK FOR THE PODIUM NEEDED FOR |
| | 223FT. CLEARWATER FRONTAGE (20% HORIZONTAL TOTAL FOR |
| | PLANAR BREAK NEEDS TO BE GREATER THAN OR EQUAL TO 44.5 |
| | FT.) |
| | |
| | PLEASE CLARIFY VARIANCE REQUEST, JUSTIFICATION IS |
| | UNCLEAR AS TO WHAT THE VARIANCE IS FROM OR FOR. WHAT |
| | 4FT. PLANAR BREAKS ARE BEING ELIMINATED? WHAT TOWERS |
| | ARE MIDDLE & WEST? |
| | |
| | SHEET A5-07 BUILDING FRONTAGE AND MASS FOR THE |
| | OFFICE/HOTEL DOES NOT CREATE A CONTINUOUS 150 FT. |
| | FA?ADE WHICH WOULD REQUIRE A PLANAR BREAK. THE BUILDING |
| | IS ALREADY BROKEN UP INTO THREE SEPARATE PLANES/FACES. |
| | |
| | SHEET A5-05, A5-06, BALCONIES FOR THE RESIDENTIAL |
| | BUILDINGS DO NOT CONSTITUTE AS PLANAR BREAKS, AS THESE |
| | ARE JUST PUNCH OUTS ALONG THE SAME BUILDING FACE. |
| | PORTIONS OF THE FACADE ITSELF NEEDS TO BE RECESSED OR |
| | PROTRUDE TO A DEPTH OF AT LEAST 3 FT. |
| | |
| | TV JULY 19TH RESPONSE: ACKNOWLEDGED |
| | |
| | ZONING 8.19 - [REPEAT FROM ABOVE] |
| | |
| | SHEET A-5-07 SATISFIES PLANAR BREAK REQUIREMENTS. |
| | |
| | PLEASE PROVIDE MORE DETAIL FOR THE GARAGE SCREENING. IS |
| | THE GREEN-WALL LIVING PLANT MATERIAL; IF SO WHAT KIND |
| | OF PLANTS ARE PROVIDED/HOW IS THIS |
| | MAINTAINED/IRRIGATED? ARE THE GREEN-WALL SECTIONS |
| | RECESSED.FROM THE METAL SCREENING? |
| | |
| | TV JULY 19TH RESPONSE: THE GARAGE SCREENING HAS BEEN |
| | REVISED AND IS A COMBINATION OF METAL SCREENING WITH AN |
| | ETCHED DESIGN AND WITH LIVING PLANT MATERIAL. SEE |
| | SHEETS A5-08. |
| | |
| | ZONING 8.19 - [NOT SATISFIED] SHEETS ARE NOT REVISED. |
| | REPEAT OF PREVIOUS COMMENT. |
| | |
| | TRANSPARENCY REQUIREMENTS APPEAR TO BE MET BASED UPON |
| | ELEVATIONS PROVIDED. PLEASE PROVIDE CALCULATIONS WITHIN |
| | TABLE OR ON DRAWINGS. |
| | |
| | TV JULY 19TH RESPONSE: THE GROUND FLOOR IS |
| | SUBSTANTIALLY ALL GLASS. SEE SHEETS A4-22, A4-23, |
| | A4-24, A4-25, A4-26 AND A4-27. |
| | ZONING 8.19 - [NOT SATISFIED] REPEAT OF PREVIOUS |
| | COMMENT. IT IS UNDERSTOOD THE GROUNDFLOOR IS |
| | SUBSTANTIALLY GLASS, HOWEVER PERCENTAGES SHOULD BE |
| | PROVIDED SHOWING COMPLIANCE. |
| | |
| | 19. PLEASE PROVIDE DETAILS AND MATERIALS OF THE GARAGE |
| | STRUCTURE, HOW IS IT BEING SCREENED, MATERIALS, PLANTS, |
| | ETC. [GENERAL SPECIFICATION FOR GARAGE FACADE SCREENING |
| | MATERIALS ADDED TO ELEVATIONS] PLEASE PROVIDE MORE |
| | DETAIL FOR THE GARAGE SCREENING. IS THE GREEN WALL |
| | LIVING PLANT MATERIAL; IF SO WHAT KIND OF PLANTS ARE |
| | PROVIDED/HOW IS THIS MAINTAINED/IRRIGATED? ARE THE |
| | GREEN-WALL SECTIONS RECESSED FROM THE METAL SCREENING? |
| | ARE THERE OTHER RECESSED PORTIONS/PLANAR BREAKS WITHIN |
| | THE SCREENING TO REAK UP THE MASS? PLEASE PROVIDE MORE |
| | DETAIL INTO SCREENING GRAPHIC, COLOR, & TREATMENT. |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE RESPONSE ABOVE |
| | ZONING 8.19 - [NOT SATISFIED] SHEETS ARE NOT REVISED. |
| | REPEAT OF PREVIOUS COMMENT. |
| | |
| | 20. REGARDING THE ARCHITECTURAL DESIGN OF THE TOWERS, |
| | HAS VARIED FACADES AND ELEMENTS BEEN EXPLORED OR IS |
| | THERE A REASON FOR UNVARIED/SIMILARLY DESIGNED TOWERS? |
| | [THE PROPOSED PROJECT DESIGN WAS CREATED AND EXECUTED |
| | PERSONALLY BY ARCHITECT BERNARDO FORT-BRESCIA OF |
| | ARQUITECTONICA. THE PROJECT DESIGN IS EXTREMELY WELL |
| | BALANCED WHILE REPRESENTING ARQ'S SIGNATURE MODERN |
| | STYLIZATION THROUGHOUT THE COHESIVE DESIGN] NOTED. |
| | PREVIOUS APPROVAL FOR TRANSIT VILLAGE HAD INCORPORATED |
| | FAR MORE VARIATION IN MASSING AND ARCHITECTURAL |
| | FEATURES THAT RESPECTED THE CONTEXT OF THE SURROUNDING |
| | BUILT ENVIRONMENT AND HISTORIC ELEMENTS ADJACENT TO THE |
| | SITE. |
| | |
| | -GARAGE SCREENING PRESENTS A STARK CONTRAST BETWEEN |
| | THE HISTORIC SEABOARD TRAIN STATION AND PRESENTS AN |
| | OPPORTUNITY TO EXPLORE ALTERNATIVE COLOR SCHEMES, |
| | SCREENING/MESH, GRAPHICS, RECESSES/PROTRUSIONS, ETC. |
| | WITHIN ITS DESIGN. THE GARAGE SCREENING SHOULD RESPECT |
| | OR PRESENT THESE SPACES IN A MORE COHESIVE MANNER. |
| | CURRENTLY THE TRAIN-STATION SITS IN FRONT OF A |
| | MASSIVELOCKY BACKDROP AND GETS LOST. |
| | |
| | -THE WATER TREATMENT FACILITY ON BANYAN IS ALSO AN |
| | HISTORIC SITE WITHIN THE SHADOW OF THE RESIDENTIAL |
| | TOWER. PREVIOUS APPROVAL FEATURED A STEP-BACK OR |
| | STAIRCASE MASSING TO LOWER THE SCALE TOWARD |
| | BANYAN/WATER TREATMENT FACILITY, AND THE TRAIN STATION |
| | ALONG TAMARIND. RECOMMEND PURSUING A SIMILAR CONCEPT TO |
| | BETTER SCALE AND FRAME THE MASSING. |
| | |
| | -REGARDING THE HOTEL/OFFICE TOWER, PREVIOUS |
| | APPROVALPROVIDED ADDITIONAL SPACING AND STEPPED BACK |
| | FURTHER FROM THE SEABOARD TRAIN STATION, PROVIDING A |
| | MORE APPROPRIATELY SCALED PEDESTRIAN ENVIRONMENT THAT |
| | DIDN?T OVERSHADOW THE HISTORIC BUILDING BELOW. |
| | ADDITIONALLY, THE BLUE FACADE TREATMENT OR PAINTING IS |
| | ANOTHER STARK CONTRAST TO THE TRAIN STATION, PLEASE |
| | EXPLORE MORE OMPATIBLE COLOR SCHEMES (E.G. EARTH TONES) |
| | |
| | TV JULY 19TH RESPONSE: WE HAVE REVISED THE COLOR |
| | SCHEME. WE ARE WELL AWARE OF THE HISTORIC NATURE OF THE |
| | TRAIN STATION BUILDING AND NOTE THAT ALL OF THE TV |
| | TOWERS ARE AT LEAST 250 FEET FROM THE TRAIN STATION |
| | BUILDING. GIVEN THE ODD SHAPE OF THE PROPERTY AND OUR |
| | LIMITATIONS WITH SETBACKS, WE BELIEVE THAT WE HAVE |
| | DESIGNED A PROJECT THAT WORKS AS WELL AS POSSIBLE WITH |
| | THE SURROUNDING AREA. NOTE THAT CONTRASTING COLORS ARE |
| | OFTEN UTILIZED NEXT TO HISTORIC STRUCTURES. |
| | |
| | ZONING 8.19 - [ACKNOWLEDGED] THANK YOU FOR PROVIDING A |
| | COLOR SCHEME CHANGE. CONTRASTING COLORS ARE OFTEN |
| | UTILIZED IN ORDER TO HIGHLIGHT FEATURES OR TO |
| | DIFFERENTIATE STRUCTURES OR ELEMENTS AS SEPARATE |
| | ENTITIES; IN THIS CASE, THE HISTORIC TRAIN STATION IS |
| | IN DIRECT RELATIONSHIP TO THE PROJECT AS A WHOLE AND |
| | ITS GROUND LEVEL, HENCE THE ASK FOR A MORE COMPATIBLE |
| | DESIGN ALTERNATIVES WITH MASSING, MATERIAL, COLOR, ETC. |
| | BETWEEN THESE ELEMENTS. |
| | |
| | DESIGN IS GENERALLY WITHIN BUILDING REQUIREMENTS AND |
| | REGULATORY PARAMETERS, STAFF RESPECTFULLY SUGGESTED |
| | DESIGN ALTERATIONS TO KEEP WITH THE DISTRICTS INTENT OF |
| | EXEMPLARY AND ENVIRONMENTALLY RESPONSIVE |
| | BUILDINGS/INFRASTRUCTURE; AS WELL AS THE TWO SPECIFIC |
| | CONDITIONS OF DAC SPECIAL REVIEW: (A.) RELATIONSHIP OF |
| | BUILDING TO SITE AND SURROUNDINGS; AND (C.) BUILDING |
| | DESIGN. |
| | |
| | PLANNING AND HISTORIC PRESERVATION STAFF RESPECTFULLY |
| | ASKS AGAIN FOR ADDITIONAL INFORMATION REGARDING THE |
| | SCREENING AND TREATMENT OF THE GARAGE, AS THIS IS A |
| | SIGNIFICANT PORTION OF THE PROJECT?S PODIUM AND IS |
| | VISIBLE FROM ALL SIDES. WILL THE SCREENING BE LIVING |
| | PLANT MATERIAL? IF SO, PLEASE PROVIDE DETAILS WITHIN A |
| | SEPARATE LANDSCAPE SHEET OR AS PART OF A5-08. PLEASE |
| | CLARIFY HOW THIS WILL BE MAINTAINED AND IRRIGATED; ARE |
| | THE SCREEN SECTIONS FLUSH TO THE GREEN WALL SECTIONS, |
| | ARE THERE RECESSES OR PROJECTIONS? WITH THE METAL |
| | SCREENING, HAS THERE BEEN DISCUSSION AS TO WHAT DESIGN |
| | WILL BE PRINTED/ETCHED ONTO THE FA?ADE? HAVE MATERIAL |
| | ALTERNATIVES, FENESTRATION, FA?ADE ARTICULATION, |
| | ARCHITECTURAL TREATMENTS, OR LININGS THAT ARE MORE |
| | ACTIVE BEEN EXPLORED? PREVIOUS APPROVAL HAD |
| | SIGNIFICANTLY LESS SCREENING FOR A HIGHER PARKING |
| | STRUCTURE. |
| | |
| | REGARDING THE NORTHERN/BANYAN OFFICE TOWER, PLANNING |
| | AND HISTORIC PRESERVATION STAFF ARE STILL CONCERNED |
| | WITH THE GENERAL MASSING OF THE STRUCTURE IN |
| | RELATIONSHIP TO THE PROJECT SITE, HISTORIC TRAIN |
| | STATION/TREATMENT FACILITY, AND BANYAN INTERSECTION. |
| | THE BUILDING?S GENERAL HEIGHT AND MASS IS AN IMPOSING |
| | STRUCTURE FOR THIS PORTION OF THE SITE. THE CURRENT |
| | DESIGN AND PERSPECTIVE RENDER ON SHEET A9-03 PRESENTS A |
| | BUILDING FRONTAGE THAT CREATES A WALL-LIKE CONDITION, |
| | ESPECIALLY WITH A FA?ADE THAT CONTAINS NO FA?ADE |
| | ARTICULATION OR PLANAR BREAKS. WITHOUT THE REQUESTED |
| | STEP-BACKS, THE FRONTAGE ALONG BANYAN IS A VERY STARK |
| | CONTRAST FROM LOW-SCALE TO HIGH. STAFF REFERENCES THE |
| | PREVIOUS APPROVAL, AS IT HAD FEATURED A STEP-BACK OR |
| | TIERED ?STAIRCASE? MASSING TO PROGRESSIVELY LOWER THE |
| | SCALE TOWARD BANYAN AND RESPECT THE WATER TREATMENT |
| | FACILITY AND TRAIN STATION. STAFF RECOMMENDS PURSUING A |
| | SIMILAR DESIGN CONCEPT TO MORE APPROPRIATELY SCALE THE |
| | BUILDING AND FRAME THE SITE. |
| | |
| | 21. REGARDING THE TOWERS AND OVERALL PROJECT HEIGHT, |
| | STAFF REQUESTS THAT THE BANYAN RESIDENTIAL TOWER IS THE |
| | TALLEST RATHER THAN THE CLEARWATER HOTEL/OFFICE TOWER. |
| | THIS IS BECAUSE BANYAN IS THE WIDEST ROADWAY AND IS |
| | MORE APPROPRIATELY FRAMED/CAN ACCOMMODATE THE TALLER |
| | MASS. ADDITIONALLY, STAFF RECOMMENDS THAT THE BANYAN |
| | RESIDENTIAL TOWER STEPS DOWN IN SOME CAPACITY TOWARD |
| | TAMARIND AVE. AS WAS APPROVED WITHIN THE ORIGINAL SITE |
| | PLAN. THIS GIVES RESPECT TO THE SCALE OF THE SEABOARD |
| | TRAIN STATION AND PUBLIC REALM ALONG TAMARIND. |
| | [ACKNOWLEDGED BUT WE DO NOT AGREE WITH THE PROPOSED |
| | DESIGN SUGGESTIONS] SEE PREVIOUS COMMENT. |
| | |
| | TV JULY 19TH RESPONSE: EACH TOWER IS WITHIN THE ALLOWED |
| | HEIGHT AND WE NOTE THAT THE SOUTHERN HOTEL/OFFICE TOWER |
| | ALIGNS WITH FERN AND EVERNIA, OVER THREE BLOCKS FROM |
| | BANYAN. |
| | |
| | ZONING 8.19 - [ACKNOWLEDGED] SEE PREVIOUS COMMENT. |
| | |
| | 22. BE COGNIZANT THAT THE EDGE 2 BUILDING LOCATED AT |
| | 300 CLEARWATER IS APPROVED AND UNDERGOING BUILDING |
| | PERMITTING PROCESS, THIS PROJECT?S INGRESS/EGRESS FROM |
| | DRIVES MAY PRESENT CONFLICT POINTS. THE GROUND LEVEL |
| | PLANS NEED TO SHOW THE EDGE 2 CURB CUTS IN ORDER FOR |
| | STAFF TO EVALUATE THE IMPACT OF THE ACCESS POINTS TO |
| | CLEARWATER. ADDITIONALLY, THE PEDESTR.IAN CONNECTION |
| | FROM THE OASIS PARK ELEMENT ACROSS CLEARWATER TO THE |
| | STAIRWELL/ELEVATOR FOR THE UPPER PLAZA WILL NEED |
| | RECONSIDERATION WITH THE INCOMING DEVELOPMENT. [WE WILL |
| | COORDINATE PROJECT FEATURES AS NEEDED] [PARTIALLY |
| | SATISFIED] THANK YOU FOR OVERLAYING PORTIONS OF THE |
| | ADJACENT PROPERTIES/ROW CONTEXT. THE CURB CUTS OR EDGE |
| | 2 BUILDING ACROSS FROM SITE NEED TO BE REVISED AND |
| | REALIGNED TO ACCURATELY REFLECT CONDITIONS. |
| | |
| | TV JULY 19TH RESPONSE: THE 350 AND EDGE CURB CUTS ARE |
| | ACCURATELY PROVIDED ON THE PLANS, WE NOTE THAT THE |
| | APPROVED SITE PLAN FOR TV PREDATED THE RECENT APPROVAL |
| | FOR 300 CLEARWATER/EDGE 2. |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | 23. PLEASE CLARIFY GROUND FLOOR PEDESTRIAN CIRCULATION |
| | WITH ITC, ACCESSING UPPER PLAZA SPACES, AND INTERNAL |
| | CIRCULATION BETWEEN RETAIL AND RESIDENTIAL TOWERS. IS |
| | THE ITC BUS LOOP SEPARATED/CLOSED OFF IN THE EVENINGS |
| | WHEN BUS OPERATIONS HALT, HOW IS WAYFINDING ADDRESSED |
| | TO ACCESS THE UPPER PLAZA SPACES? [PATRONS WILL BE |
| | QUEUED BY FENCING, GATES, LIGHTING, AND WAY FINDING |
| | SIGNAGE] [NOT SATISFIED] IS THE INTENTION FOR GENERAL |
| | PUBLIC TO ACCESS REST OF SITE/RETAIL VIA ELEVATORS |
| | THROUGH THE RESIDENTIAL TOWERS? |
| | |
| | REPEAT COMMENT PORTION OF (9.J.IV.A.) PLEASE PROVIDE |
| | CLARIFICATION OF HOW GENERAL PUBLIC/USERS OF OFFICE, |
| | HOTEL, RETAIL, AND TRI-RAIL USERS WILL EFFICENTLY |
| | ACCESS THESE FACILITIES FROM THE GARAGE. |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE ABOVE. |
| | |
| | DRAWINGS INDICATE THAT THE CROSS-WALK FROM THE |
| | SOUTHERN SIDE OF THE HOTEL/OFFICE TOWER STILL |
| | EXISTS/WILL REMAIN. PLEASE ADJUST PLANS/DRAWINGS |
| | ACCORDINGLY. PLEASE PROVIDE JUSTIFICATION / |
| | CLARIFICATION OF WHY THIS CROSSWALK IS BEING REMOVED. |
| | |
| | TV JULY 19TH RESPONSE: CROSS WALKS ARE NOT TO BE |
| | REMOVED AND TO REMAIN AS IS. THE LABELING HAS BEEN |
| | REVISED TO PROVIDE THIS CLARIFICATION. |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | PLEASE PROVIDE ELEVATIONS / RENDERS OF THE PROPOSED |
| | SPIRAL STAIRCASE/ELEVATOR ON CLEARWATER DR. FOR THE |
| | UPPER PLAZA. PUBLIC ACCESS TO UPPER PLAZA FROM THIS |
| | STAIRCASE IS NOT OBVIOUS; PLEASE PROVIDE ADDITIONAL |
| | CONTEXT DISPLAYING THIS ENTRANCE. |
| | |
| | TV JULY 19TH RESPONSE: ADDITIONAL DETAIL IS PROVIDED ON |
| | SHEET A5-11. |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | STAFF SUGGESTS AN ADDITIONAL STAIRWELL OR ACCESS POINT |
| | FROM THE SOUTHERN END OF THE OFFICE/HOTEL TOWER FROM |
| | THE DECK/PLAZA TO PROVIDE ADDITION CIRCULATION BETWEEN |
| | ITC / SFRTA AND UPPER PLAZA. |
| | |
| | TV JULY 19TH RESPONSE: THE SPIRAL STAIRCASE AND |
| | ELEVATOR ON CLEARWATER PROVIDES SUBSTANTIAL PROMINENCE |
| | AND ACCESS TO AND FROM THE PLAZA. THE PLAZA ALSO IS |
| | ACCESSED FROM THE PEDESTRIAN BRIDGE AND A NEW STAIRWAY |
| | TO THE TRI-RAIL AMTRAK PLATFORM . THERE IS NO |
| | CONNECTION POINT FOR AN ADDITIONAL STAIRWELL AT THE |
| | SOUTHERN END OF THE PLAZA AS THERE IS NO GROUND PUBLIC |
| | ACCESS POINT BELOW . |
| | ZONING 8.19 - [ACKNOWLEDGED] |
| | |
| | A. THE ITC ADA PATH DRAWING SUBMITTED WITH THE |
| | APPLICATION SHOWS THE ADA ROUTE UTILIZING A CROSSWALK |
| | THAT IS DESIGNATED FOR REMOVAL. [THE ADA PATHWAY AND |
| | CROSSWALK WILL BE REMOVED PURSUANT TO THE COUNTY |
| | REQUEST TO REMOVE THEM FROM THE ITC.] [NOT SATISFIED] |
| | DRAWINGS INDICATE THAT THE CROSS-WALK FROM THE SOUTHERN |
| | SIDE OF THE HOTEL/OFFICE TOWER STILL EXISTS/WILL |
| | REMAIN. PLEASE ADJUST PLANS/DRAWINGS ACCORDINGLY. |
| | PLEASE PROVIDE JUSTIFICATION/CLARIFICATION OF WHY THIS |
| | CROSSWALK IS BEING REMOVED. |
| | |
| | TV JULY 19TH RESPONSE: CORRECTING THE PRIOR RESPONSE, |
| | THIS CROSSWALK IS NOT BEING REMOVED AND TO REMAIN AS IS |
| | AT THE ELECTION OF PALM TRAN. THE LABELING HAS BEEN |
| | REVISED TO ELIMINATE THE LANGUAGE ABOUT REMOVAL. |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | B. THE ITC FENCE EXHIBIT SHOWS THE FENCE AROUND THE |
| | OPEN SPACE AT THE SOUTH END OF THE SITE AS A PRIVATE |
| | PARK FENCE. THIS DOES NOT MATCH THIS AS BEING DEPICTED |
| | AS PUBLIC OPEN SPACE ON OTHER PLANS. [THIS IS A BONUS |
| | OPEN SPACE AREA DESIGNED TO BE OPERATED IN CONJUNCTION |
| | WITH THE SFRTA PLATFORM AND ITC OPERATION. THIS AREA |
| | WILL BE CLOSED TO PUBLIC ACCESS WHEN THE ITC IS CLOSED] |
| | [NOT SATISFIED] PER SECTION 94-109 OPEN SPACE, PRIVATE. |
| | IF PRIVATE OPEN SPACE IS LOCATED ON THE GROUND FLOOR |
| | AND LOCATED ALONG THE LOT FRONTAGE, IT SHALL BE |
| | DESIGNED IN COMPLIANCE WITH THE PUBLIC OPEN SPACE |
| | REQUIREMENTS, AND IT SHALL BE ACCESSIBLE BY THE PUBLIC |
| | FOR PUBLIC USE. |
| | |
| | TV JULY 19TH RESPONSE: TO CORRECT OUR PRIOR RESPONSE, |
| | THIS SPACE WILL NOT BE DIRECTLY ACCESSIBLE FROM THE |
| | TRAIN PLATFORM OR THE ITC AS ACCESS WILL ONLY BE FROM |
| | CLEARWATER. THE SPACE WILL NOT BE OPERATED IN |
| | CONJUNCTION WITH MASS TRANSIT BUT WILL BE ACCESSIBLE BY |
| | THE PUBLIC FOR PUBLIC USE. |
| | ZONING 8.19 - [SATISFIED] WILL THE GATES BE OPEN 24/7 |
| | OR CLOSE DURING CERTAIN HOURS? |
| | |
| | |
| | 24. STAFF WILL BE RECOMMENDING PEDESTRIAN IMPROVEMENTS |
| | AND INCREASED ACCESSIBILITY TO TAMARIND AND THE |
| | DOWNTOWN AREA. AS A TOD PROJECT, YOU MUST DEMONSTRATE |
| | HOW THE RELATION AND CONNECTIVITY IS IMPROVED TO THESE |
| | CORRIDORS INTO THE DOWNTOWN. RECOMMEND POTENTIAL: WORK |
| | WITH SFRTA TO IMPLEMENT AT-GRADE CONNECTION(S) ACROSS |
| | RAILS TO TAMARIND. IMPROVE THE PEDESTRIAN BRIDGE |
| | CONNECTING SEABOARD TRAIN STATION AND TRANSIT VILLAGE |
| | PROJECT. EXPLORE CONCEPT OF ADDITIONAL PEDESTRIAN |
| | BRIDGES OR CONNECTIONS. [THE REVISED PROJECT DESIGN |
| | PROVIDES ACCESSIBILITY TO THE GARAGE, RETAIL, BIKE |
| | STORAGE, ITC AND RAIL FACILITIES FROM BOTH BANYAN |
| | BOULEVARD AND CLEARWATER DRIVE. THESE ACCESS POINTS ARE |
| | PROVIDED UNDER COVERED WALKWAYS AND THEY HAVE ACTIVE |
| | USES PROVIDED ALONG THEIR FRONTAGES. THE NEW ACCESS |
| | POINT FROM BANYAN ALONG THE WEST SIDE OF THE TRACKS NOW |
| | PROVIDES A DIRECT ROUTE BACK TOWARD BANYAN BOULEVARD] |
| | [NOT SATISFIED] PLEASE CLARIFY OR MARK ON PLANS THE NEW |
| | ACCESS POINT FROM BANYAN. NOT UNDERSTANDING THE |
| | INCREASED ACCESSIBILITY AND PEDESTRIAN IMPROVEMENT |
| | DESCRIBED. ADDITIONALLY STAFF RECOMMENDS AN ADDITIONAL |
| | STAIRWELL OR ACCESS POINT FROM THE SOUTHERN END OF THE |
| | OFFICE/HOTEL TOWER FROM THE DECK/PLAZA TO PROVIDE |
| | ADDITIONAL CIRCULATION BETWEEN ITC/SFRTA AND UPPER |
| | PLAZA. |
| | |
| | TV JULY 19TH RESPONSE: SEE RESPONSES ABOVE. THE BANYAN |
| | ACCESS IS DIRECTLY WEST OF THE TRACKS. PLEASE NOTE THAT |
| | THE AMENDED SITE PLAN HAS BEEN APPROVED BY THE SFRTA |
| | (TRI-RAIL), THE COUNTY (PALM TRAN) AND THAT THE PSA WAS |
| | APPROVED BY THE FTA. TV BELIEVES THAT IT IS VERY |
| | SUPPORTIVE OF THE TOD CONCEPT AS IT HAS ELEMENTS |
| | CONTAINING LIVE/WORK/PLAY/SHOP DIRECTLY ABOVE MASS |
| | TRANSIT AND CONNECTS THE SEABOARD TRAIN STATION AND |
| | TRI-RAIL, AMTRAK, PALM TRAN, GREYHOUND AND THE CITY |
| | TROLLEY TO THE AMENITY RETAIL PLAZA. |
| | |
| | 25. PLEASE PROVIDE INFORMATION ON WHAT THE MOTOR LOBBY? |
| | IS. [IT IS SMALL LOBBY FOR THE OFFICE AND HOTEL AT THE |
| | GROUND LEVEL INTENDED TO PROVIDE GROUND FLOOR ACCESS TO |
| | VEHICLES PICKING UP AND DROPPING OFF PATRONS, MAIL |
| | PACKAGES, LUGGAGE, ETC.] [SATISFIED] |
| | |
| | 26. THE SOUTH RESIDENTIAL BUILDING IS NOT PERMITTED TO |
| | ENCROACH THE 20-FOOT FIRE DEPARTMENT ACCESS EASEMENT. |
| | NOTE: EVEN WITHOUT THE BUILDING ENCROACHMENT, THIS DOES |
| | NOT FUNCTION. [THIS FIRE ACCESS IS NOT REQUIRED AND IS |
| | PROPOSED TO BE REMOVED] [NOT SATISFIED] PLEASE PROVIDE |
| | EVIDENCE OF EASEMENT REMOVAL AND FIRE DEPT. APPROVAL. |
| | |
| | TV JULY 19TH RESPONSE: EASEMENTS WILL EITHER BE |
| | ABANDONED OR RELOCATED PRIOR TO PERMIT. FIRE ACCESS |
| | WHICH ARE NOT REQUIRED HAVE BEEN REMOVED. |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | 27. PROVIDE TURNING DIAGRAMS FOR THE LOADING AREAS |
| | UNDER THE NORTH BUILDING, ENTRY POINTS TO THE SITE AND |
| | THE OTHER LOADING AREAS. [AUTO TURN EXHIBITS PROVIDED] |
| | BASED UPON THE AUTOTURNS PROVIDED: |
| | [NOT SATISFIED] PLEASE PROVIDE JUSTIFICATION FOR DOUBLE |
| | INGRESS RAMP AND DOUBLE EGRESS RAMP. |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE RESPONSES ABOVE. |
| | ZONING 8.19 - [ACKNOWLEDGED] MANAGEMENT PLAN FOR |
| | LOADING/ACCESS TO BE INCLUDED PRIOR TO SITE PLAN |
| | APPROVAL. |
| | |
| | GROUND LEVEL LOADING BAYS AND OPERATION CREATES CLEAR |
| | CONFLICT POINTS AND IS A TRAFFIC/SAFETY HAZARD WITH |
| | INGRESS/EGRESS OF PATRONS TO THE UPPER LEVELS OF THE |
| | GARAGE AND GROUND LEVEL ADA ACCESS. QUEUING AND |
| | SPILLBACK IS AN INEVITABILITY DURING OPERATIONAL HOURS. |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE RESPONSES ABOVE. |
| | ZONING 8.19 - [ACKNOWLEDGED] MANAGEMENT PLAN FOR |
| | LOADING/ACCESS TO BE INCLUDED AS A CONDITION OF SITE |
| | PLAN APPROVAL. |
| | |
| | AUTOTURN FOR DELIVERIES POSES CONFLICT POINTS WITH ADA |
| | AND OTHER OPERATIONS INTERSECTS WITH DOWNWARD RAMP. |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE RESPONSES ABOVE. |
| | ZONING 8.19 - [ACKNOWLEDGED] MANAGEMENT PLAN FOR |
| | LOADING/ACCESS TO BE INCLUDED PRIOR TO SITE PLAN |
| | APPROVAL. |
| | |
| | INTERNAL GARAGE CIRCULATION ALTERNATING ACROSS LEVELS |
| | WITH ONE-WAY /TWO-WAY AISLES POSES CONCERNS. |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE RESPONSES ABOVE. |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | IS THE INTENTION FOR GENERAL PUBLIC TO ACCESS REST OF |
| | SITE/RETAIL VIA ELEVATORS THROUGH THE RESIDENTIAL |
| | TOWERS? REPEAT COMMENT PORTION OF (9.J.IV.A.) PLEASE |
| | PROVIDE CLARIFICATION OF HOW GENERAL PUBLIC/USERS OF |
| | OFFICE, HOTEL, RETAIL, AND TRI-RAIL USERS WILL |
| | EFFICIENTLY ACCESS THESE FACILITIES FROM THE GARAGE. |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE RESPONSES ABOVE. |
| | ZONING 8.19 - [PARTIALLY SATISFIED] REPEAT COMMENT FROM |
| | ABOVE. GENERAL PATRONS OF THE SITE (OFFICE, HOTEL, |
| | VISITORS) WITH ADA NEEDS THAT PARK ON FLOORS 3-8 DO NOT |
| | HAVE SPACES ADJACENT TO NON-RESIDENTIAL ELEVATORS AND |
| | CORRIDORS. REDISTRIBUTE OR INCLUDE SPACES IN THE AREAS |
| | SIMILAR TO LEVEL 2. |
| | |
| | PLEASE PROVIDE DIMENSIONS FOR LOADING BAY ON THE GROUND |
| | FLOOR |
| | |
| | TV JULY 19TH RESPONSE: PROVIDED (SEE SHEET A1-01 AND |
| | A4-02) |
| | ZONING 8.19 - [NOT SATISFIED] LOADING BAYS WITHIN THE |
| | GROUND LEVEL OF THE PARKING GARAGE ARE NOT DIMENSIONED, |
| | PLEASE PROVIDE THESE DETAILS. |
| | |
| | SHEET C-19 SHOWS ARROW IN OPPOSITE DIRECTION OF |
| | RESIDENTIAL DROP-OFF TRAFFIC FLOW |
| | |
| | TV JULY 19TH RESPONSE: THIS HAS BEEN CORRECTED (SEE |
| | SHEET C-19) |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | |
| | 28. WHERE ARE THE GENERATORS TRANFORMERS, AND OTHER |
| | MECHANICAL EQUIPMENT AND HOW ARE THEY SCREENED IN |
| | ACCORDANCE WITH CITY CODE REQUIREMENTS? [LABELED ON |
| | PLANS] [NOT SATISFIED] SHEET C-05 & C-04 SHOW FDC IN |
| | WITHIN THE MIDDLE OF BIKE RACKS, OR EXPOSED WITHIN ROW. |
| | |
| | TV JULY 19TH RESPONSE: IN THE ROOM LABELED ?TV? |
| | (TRANSFORMER VAULT) SHOWN ON PLANS, PLEASE SEE SHEETS |
| | A1-01 AND A4-02. |
| | ZONING 8.19 - [NOT SATISFIED] MECHANICAL ROOMS, |
| | GENERATORS, AND TRANSFORMERS ARE OKAY. REPEAT COMMENT: |
| | SHEET C-05 & C-04 SHOWS THE FDC VALVE LOCATED IN WITHIN |
| | THE MIDDLE OF BIKE RACK ON THE GROUND LEVEL OF THE |
| | HOTEL/OFFICE. PLEASE ADJUST PLANS ACCORDINGLY. |
| | |
| | PLEASE WALL-MOUNT ANY WATER METERS, FIRE/CHECK/CONTROL |
| | VALVES, ETC. WHENEVER POSSIBLE. |
| | |
| | TV JULY 19TH RESPONSE: WATER METERS, FIRE/CHECK/CONTROL |
| | VALVES, ETC., WHENEVER POSSIBLE, WILL BE MOUNTED. |
| | ZONING 8.19 - [ACKNOWLEDGED] |
| | |
| | ANY EXPOSED MECHANICAL EQUIPMENT, METERS, OR VALVES |
| | SHALL BE SCREENED FROM VIEW WITH LANDSCAPING. |
| | |
| | TV JULY 19TH RESPONSE: ANY EXPOSED MECHANICAL |
| | EQUIPMENT, METERS, OR VALVES SHALL BE SCREENED FROM |
| | VIEW WITH LANDSCAPING. |
| | ZONING 8.19 - [ACKNOWLEDGED] |
| | |
| | 29. PLEASE CONSIDER USING SUSTAINABLE INFRASTRUCTURE |
| | SUCH AS ROOFTOP SOLAR OR RAINWATER CAPTURE/REUSE |
| | CISTERNS. NO RESPONSE PROVIDED. WHILE NOT REQUIRED, HAS |
| | THIS ITEM BEEN GIVEN ANY CONSIDERATION? |
| | |
| | TV JULY 19TH RESPONSE: THIS WILL BE CONSIDERED WHEN |
| | DEVELOPING CONSTRUCTION PLANS |
| | ZONING 8.19 - [ACKNOWLEDGED] |
| | |
| | 30. SHEET A6-01 SHOWS PUBLIC OPEN SPACES EXTENDING INTO |
| | THE BUS LANE. [LANDSCAPE PLANS HAVE BEEN UPDATED |
| | REDUCING THE OPEN SPACES OUTSIDE OF THE BUS LANES |
| | [PLANS REVISED TO REMOVE SIDEWALK SERVING BUS LANE FROM |
| | THE OPEN SPACE] [SATISFIED] LANDSCAPE NO LONGER |
| | ENCROACHES/OVERLAPS |
| | |
| | 31. FOR THE EVENTUAL DOWNTOWN ACTION COMMITTEE (DAC) |
| | MEETING, PLEASE PROVIDE FULLY DETAILED RENDERINGS AND |
| | PERSPECTIVE DRAWINGS OF THE FINAL PROJECT. |
| | [ACKNOWLEDGED] [PARTIALLY SATISFIED] PLEASE NOTE, ALL |
| | PROVIDED RENDERINGS ARE ONLY OF THE TAMARIND AND BANYAN |
| | PERSPECTIVES. THERE ARE NO RENDERS SHOWN FOR CONDITIONS |
| | ALONG CLEARWATER DR. |
| | |
| | TV JULY 19TH RESPONSE: ADDITIONAL RENDERS WILL BE |
| | TIMELY PROVIDED |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | PLEASE PROVIDE DETAILS/RENDERS OF THE SPIRAL |
| | STAIRCASE/ELEVATOR SHAFT USED TO ACCESS THE UPPER |
| | PUBLIC OPEN SPACE/PLAZA |
| | |
| | TV JULY 19TH RESPONSE: ADDITIONAL DETAIL OF THE SPIRAL |
| | STAIRCASE/ELEVATOR IS PROVIDED ON SHEET A5-10. |
| | ZONING 8.19 - [PARTIALLY SATISFIED] TREE IN RENDERING |
| | NOT REPRESENTED IN LANDSCAPE PLANS OR ACCURATE TO |
| | PLANS. PLEASE ADJUST, SEE COMMENT #15 FOR INCLUSION OF |
| | ADDITIONAL STREET TREES. |
| | |
| | 32. PROVIDE A PRELIMINARY CONSTRUCTION PLAN TO SHOW HOW |
| | HE SITE WILL BE DEVELOPED WHILE MAINTAINING ITC |
| | OPERATIONS, TO INCLUDE PARKING. ADDITIONALLY, PROVIDE |
| | THE PRELIMINARY PLAN FOR EMPLOYEE AND CONTRACTOR |
| | PARKING DURING CONSTRUCTION. [THIS IS A PERMITTING |
| | ISSUE THAT REQUIRES CONSIDERABLE COORDINATION AND WILL |
| | BE ADDRESSED PRIOR TO BUILDING PERMITS BEING ISSUED |
| | PLEASE CARRY FORWARD AS A CONDITION OF APPROVAL. NOTE |
| | THAT AS PART OF THE PSA, WE ARE REQUIRED TO PROVIDE THE |
| | COUNTY WITH A CONTINUOUS OPERATONS PLAN. THE PLAN IS TO |
| | RELOCATE PALM TRAN TO THE EAST SIDE OF THE TRACKS, AS |
| | IS UNDER DISCUSSION AMONG THE CITY, THE COUNTY AND |
| | APPLICANT.] [ACKNOWLEDGED] |
| | |
| | THERE ARE COLUMN LOCATIONS THAT WHEN COMBINED WITH THE |
| | LOCATION OF THE PROPOSED ITC FENCE CREATE CHOKE POINTS |
| | FOR THE BUS PATRONS AS THEY CHANGE BETWEEN ROUTES. |
| | WHILE THEY ALL APPEAR TO COMPLY WITH ADA MINIMUMS, THEY |
| | DO NOT PROVIDE COMFORTABLE PEDESTRIAN WIDTHS FOR TWO |
| | USERS TO PASS SIDE-BY-SIDE. PLEASE REVIEW. |
| | [ACKNOWLEDGED] |
| | |
| | TV JULY 19TH RESPONSE: THE PROPOSED PLAN AND ACCESS |
| | MEETS CODE AND ADA REQUIREMENTS AS DESIGNED AND HAS |
| | BEEN APPROVED BY THE COUNTY/PALMTRAN. |
| | ZONING 8.19 - [ACKNOWLEDGED] |
| | |
| | 33. THE SITE, LANDSCAPE AND CIVIL PLANS ALL NEED TO |
| | SHOW CONSISTENT, CODE COMPLIANT CONDITIONS. [PLANS |
| | COORDINATED [NOT SATISFIED] ARCHITECTURAL, LANDSCAPE, |
| | AND CIVIL PLANS ALL FEATURE INCONSISTENCIES OR ELEMENTS |
| | NOT COMPLIANT WITH CODE, PLEASE REVISE. |
| | |
| | EXAMPLES INCLUDE: |
| | |
| | - BANYAN PEDESTRIAN DROPOFF, WHICH IS NOT PERMITTED, |
| | IS STILL SHOWN ACROSS ALL PLAN |
| | - CROSSWALK AT THE ENTRANCE OF ITC STILL SHOWN ON |
| | PLANS, BUT COMMENTS/REFERENCES STATE IT IS TO BE |
| | REMOVED. |
| | - ELEVATIONS FEATURE COLUMNS NOT PRESENT IN GROUND |
| | FLOOR PLANS. |
| | - ETC |
| | |
| | TV JULY 19TH RESPONSE: WE HAVE MADE CHANGES TO MAKE THE |
| | PLANS CONSISTENT AND CODE-COMPLIANT. |
| | ZONING 8.19 - [PARTIALLY SATISFIED] CHANGES HAVE BEEN |
| | MADE TO PLANS; HOWEVER INCONSISTENCIES STILL EXIST |
| | BETWEEN THE ARCH, CIVIL, AND LANDSCAPE PLAN SETS |
| | REGARDING LABELING. |
| | |
| | |
| | 34. PROVIDE VERIFICATION THAT THE PROJECT MEETS THE |
| | STREETSCAPE REQUIREMENTS OF SECTION 94-113. THIS |
| | INCLUDES LIGHTING, SIDEWALK WIDTH, LANDSCAPE, BICYCLE |
| | PARKING, STREET FURNITURE, ETC. [NOTED] [THE PROJECT |
| | COMPLIES WITH STREETSCAPE REQUIREMENTS OF SECTION |
| | 94-113.] [NOT SATISFIED] PLEASE PROVIDE DIMENSIONS FOR |
| | SIDEWALK WIDTHS AND CLEAR PATHS, PLEASE PROVIDE A |
| | LOCATION CALLOUT, DIMENSIONS, AND COUNT OF BICYCLE |
| | RACKS PROVIDED FOR PUBLIC ACCESS (REQUIREMENT IS 1 |
| | SPACE PER 100 FT. OF STREET FRONTAGE). |
| | |
| | TV JULY 19TH RESPONSE: DIMENSIONS FOR SIDEWALK WIDTHS |
| | AND CLEAR PATHS ARE PROVIDED ON SHEETS C-10 AND C-11. |
| | CALLOUT, DIMENSIONS, AND COUNT OF BICYCLE RACKS |
| | PROVIDED FOR PUBLIC ACCESS ARE PROVIDED ON SHEETS C-10, |
| | C-11, A0-02 AND L111. |
| | |
| | ZONING 8.19 - [PARTIALLY SATISFIED] SEE COMMENT #15. |
| | INCLUSION OF ADDITIONAL STREET TREES ON THE CLEARWATER |
| | FRONTAGE IS REQUIRED. |
| | |
| | SHEET A0-02 ? THE TABULAR DATA SHOWS 160 GROUND LEVEL |
| | SPACES AND 122 UNALLOCATED BIKE SPACES. WITH THE TOTAL |
| | PROVIDED BIKE SPACES AT 606, PLEASE CLARIFY WHERE IS |
| | THIS TOTAL COMING FROM? CAN YOU PLEASE SPECIFY HOW MANY |
| | SPACES ARE ALONG THE GROUND LEVEL/ADJACENT TO ROW? |
| | THESE BIKES SATISFY THE 1 SPACE PER 100 FT. OF STREET |
| | FRONTAGE REQUIREMENT. |
| | |
| | 35. PROVIDE COMPLIANCE WITH SEC. 94?106 7 GENERAL USES |
| | WITH SPECIAL REQUIREMENTS (8.A) MICRO-UNITS |
| | (A.-F.)[NOTES ADDED TO PLAN TO SHOW COMPLIANCE WITH |
| | MINIMUM AVERAGE AND OTHER DWELLING UNITS REQUIREMENTS] |
| | |
| | A. MICRO-UNIT MEANS A SMALL RESIDENTIAL ?UNIT WITH A |
| | TOTAL SQUARE FOOT8GE BETWEEN 300 SQUARE FEET AND 549 |
| | SQUARE FEET, WITH A FULLY FUNCTIONING KITCHEN AND |
| | BATHROOM. [REGULAR UNITS_WILL COMPLY TO ALL REGULATIONS |
| | THERE ARE ALSO COMPLAINT MICRO UNITS THAT ARE LESSED |
| | OUT FROM THE REGULAR UNIT AVERAGE CALCULATION] |
| | B. SEC. 94-109 DWELLING UNIT REQUIREMENTS |
| | VIII. DWELLING UNITS SHALL NOT BE LESS THAN 550 SQUARE |
| | FEET. IN MULTIPLE DWELLING UNIT BUILDINGS, THE |
| | CUMULATIVE AVERAGE OF ALL DWELLING UNITS SHALL NOT BE |
| | LESS THAN 800 SQUARE FEET. |
| | IX. SMALLER DWELLING UNITS MAY BE ALLOWED AS |
| | MICRO-UNITS. THE CUMULATIVE AVERAGE SIZE MINIMUM SHALL |
| | NOT BE APPLICABLE TO MULTIPLE DWELLING UNIT BUILDINGS |
| | WHERE MICRO-UNITS COMPOSE A MINIMUM OF 80 PERCENT OF |
| | THE TOTAL NUMBER OF UNITS. IN ALL OTHER CASES, THE |
| | CUMULATIVE AVERAGE SIZE OF ALL DWELLING UNITS SHALL NOT |
| | INCLUDE THE MICRO-UNITS IN SUCH CALCULATION. SEE |
| | MICRO-UNITS. [ACKNOWLEDGED] [NOT SATISFIED] PLEASE |
| | PROVIDE CLARIFICATION FOR THE PARKING PROVIDED FOR |
| | MICRO-UNITS, IF ITS 13 CAR-SHARE ALONE OR IF ITS 13 |
| | SPACES AND 13 CAR-SHARE (26 TOTAL). PLEASE PROVIDE |
| | FINAL COUNT AND LOCATION FOR THE REQUIRED 0.5 BIKE |
| | SPACES PER UNIT. PLEASE NOTE CONDITION OF APPROVAL FOR |
| | MICRO-UNITS WILL INVOLVE A CONTRIBUTION TO THE CITY |
| | TROLLEY FEE PER UNIT PER MONTH. |
| | |
| | TV JULY 19TH RESPONSE: SHEET A0-02 PROVIDES THE |
| | REQUESTED INFORMATION FOR THE MICRO UNITS PARKING. |
| | SHEET A0-02 PROVIDES THE FINAL COUNT OF BIKE SPACES. |
| | SHEET A0-02 PROVIDES THE CALCULATION FOR THE AVERAGE |
| | SIZE OF ALL DWELLING UNITS (NOT INCLUDING MICRO UNITS) |
| | [SATISFIED] |
| | |
| | ADITIONAL COMMENTS BASED UPON RESUBMITTED DOCUMENTS |
| | SHEETS, AND REVISED PLANS: 7/5/22 |
| | |
| | 1. REVISE LIST OF VARIANCES BASED UPON CORRECTIONS TO |
| | OPEN SPACE, CURB CUT WIDTHS, PLANAR BREAKS/FACADE |
| | ARTICULATION, ETC. ANY DEVIATION FROM REQUIRED MINIMUMS |
| | OR MAXIMUMS CONSTITUTES A REQUEST FOR VARIANCE. |
| | |
| | TV JULY RESPONSE: REPEAT SEE RESPONSES ABOVE. |
| | ZONING 8.19 - DUE TO THE UNRESOLVED COMMENTS WITHIN |
| | THIS REVIEW, ADDITIONAL VARIANCES MAY BE REQUIRED OR |
| | EXISTING REQUESTS MAY HAVE TO BE MODIFIED. |
| | |
| | 2. FACADE ARTICULATION? PLEASE PROVIDE MORE DETAILS FOR |
| | THE GARAGE SCREENING, GREEN-WALL, AND PLANAR BREAKS. |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE RESPONSES ABOVE. |
| | ZONING 8.19 ? REPEAT COMMENT, PLEASE PROVIDE |
| | |
| | 3. PLEASE PROVIDE ALL NECESSARY APPROVALS FROM FIRE |
| | DEPARTMENT, UTILITY PROVIDERS, FPL, ETC. FOR THE |
| | VACATING/MODIFICATION OF ANY EASEMENTS AND STRUCTURES. |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE RESPONSES ABOVE. |
| | ZONING 8.19 ? REPEAT OF RESPONSES ABOVE |
| | |
| | 4. ON SITE PLANS, THE CROSSWALK AT THE INTERSECTION OF |
| | CLEARWATER / BANYAN NOT REFLECTIVE OF EXISTING BANYAN |
| | STREETSCAPE, THERE ARE SEPARATE BIKE LANE AND |
| | PEDESTRIAN CROSSING LANE |
| | |
| | TV JULY RESPONSE: REPEAT SEE RESPONSES ABOVE. |
| | ZONING 8.19 ? [PARTIALLY SATISFIED] BIKELANE/CROSS WALK |
| | SHOWN ON CIVIL SET BUT NOT LANDSCAPE/ARCHITECTURE, |
| | PLEASE ADJUST |
| | |
| | 5. SHOW SETBACK LINES ON THE ELEVATIONS |
| | |
| | TV JULY 19TH RESPONSE: THE SETBACK LINES HAVE BEEN |
| | ADDED TO THE ELEVATIONS. |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | 6. PLEASE PROVIDE CIRCULATION DIAGRAM OR ILLUSTRATE ALL |
| | INTERIOR DOORS/ENTRYWAYS TO, FROM, AND BETWEEN ROOMS, |
| | ENCLOSURES, RETAIL SPACES, ETC. (GROUND FLOOR FOR |
| | EXAMPLE ONLY SHOWS DOORS TO TR, BIKE ROOM, AND |
| | EXTERNAL/FACADE ROOMS) HELPS CLARIFY INTERNAL |
| | CIRCULATION OF PATRONS. |
| | |
| | TV JULY 19TH RESPONSE: INTERIOR DOORS HAVE BEEN ADDED |
| | TO THE DRAWINGS ON THE GROUND FLOOR AND LEVEL 02 SO |
| | THAT CIRCULATION CAN BE BETTER UNDERSTOOD. |
| | ZONING 8.19 - [SATISFIED] |
| | |
| | 7. PRIVATE OPEN SPACE ON GROUND FLOOR REQUIRED TO BE |
| | DESIGNED TO MEET PUBLIC OPEN SPACE REQUIREMENTS. |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE RESPONSES ABOVE. |
| | ZONING 8.19 - [SATISFIED] REPEAT OF PRIVATE AND PUBLIC |
| | OPEN SPACE COMMENTS ABOVE. |
| | |
| | |
| | 8. MAXIMUM FOOTPRINT LENGTH EXCEEDS 350 FT. FOR TOD-25 |
| | WOULD REQUIRE VARIANCE. |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE RESPONSES ABOVE. |
| | ZONING 8.19 - [ACKNOWLEDGED] VARIANCE IS REQUESTED. |
| | |
| | 9. PLEASE PROVIDE A PHOTOMETRIC PLAN, SITE ILLUMINATION |
| | MINIMUM REQUIREMENT IS 0.6 FOOTCANDLES AS MEASURED ATHE |
| | BACK EDGE OF THE CURB AND ONE FOOT ABOVE THE SIDEWALK. |
| | |
| | TV JULY 19TH RESPONSE: A PHOTOMETRIC PLAN WILL BE |
| | PROVIDED WITH THE PERMIT DRAWINGS. |
| | ZONING 8.19 - [ACKNOWLEDGED] WILL INCLUDE CONDITION TO |
| | PROVIDE PHOTOMETRICS BEFORE BUILDING PERMIT. |
| | |
| | 10. PLEASE FULLY DIMENSION SITE PLANS AND DRAWINGS, OR |
| | PROVIDE SEPARATE SHEETS OF DIMENSIONED SITE PLANS AND |
| | DRAWINGS, VERY LITTLE SPATIAL INFORMATION IS PROVIDED |
| | WITHIN PLANS. |
| | |
| | SIDEWALK WIDTHS, CURB-CUTS, LANDSCAPE BEDS, PLANAR |
| | BREAK DEPTHS, FRONTAGES, SETBACKS, PROPERTY LINES, ETC. |
| | |
| | TV JULY 19TH RESPONSE: REPEAT SEE RESPONSES ABOVE. |
| | ZONING 8.19 - [NOT SATISFIED] SEE RESPONSES ABOVE. CURB |
| | CUT WIDTHS NEED TO BE RE-MEASURED, AND PLANAR BREAK |
| | DEPTHS NEED TO BE PROVIDED. |
| | |
| | 11. BASED UPON THE RESUBMITTED DOCUMENTS AND REVISED |
| | DRAWINGS, THE EXISTING ON-STREET PARKING ALONGLEARWATER |
| | DRIVE HAS BEEN REMOVED. THE REMOVAL OF METERED |
| | ON-STREET PARKING WILL INCUR A FEE. PLEASE CONTACT ED |
| | DAVIS FROM PARKING TO CLARIFY FEES ASSOCIATED WITH |
| | THESE SPACES. [email protected] |
| | |
| | TV JULY 19TH RESPONSE: THE EXISTING TAX INCENTIVE |
| | AGREEMENT WITH THE CRA AND APPROVED BY THE CITY |
| | COMMISSION ADDRESSES THE REMOVAL OF THE METERED |
| | ON-STREET PARKING. WE WILL CONTACT THE APPROPRIATE CITY |
| | PERSONNEL TO DISCUSS REMOVAL. |
| | ZONING 8.19 - [ACKNOWLEDGED] |
| | |
| | |
| | |
| | ADDITIONAL COMMENTS BASED UPON RESUBMITTED DOCUMENTS |
| | SHEETS, AND REVISED PLANS OF 7/25/22: 8-18-22 |
| | |
| | 1. PLEASE CLARIFY, ON SHEET A1-01 A ?WALL MURAL? IS |
| | SHOWN BETWEEN RESIDENTIAL BUILDING AND ITC, IS THERE A |
| | SEPARATION WALL BEING INSTALLED HERE? MURAL WILL |
| | REQUIRE A SEPARATE PERMIT. |
| | |
| | 2. PLEASE PROVIDE FAR DIAGRAMS FOR ALL FLOORS. WHILE |
| | PROJECT IS WELL WITHIN ITS PERMITTED FAR, DIAGRAMS |
| | NEEDED TO DOCUMENT FAR SHOULD FUTURE DEVELOPMENT OR |
| | REVISIONS OCCUR ON SITE. |
| | |
| | |
| | CHRIS KIMMERLY, AICP |
| | URBAN DESIGN PLANNER |
| | 822.1426 [email protected] |