Plan Review Details - Project Z22040014
Plan Review Stops For Project Z22040014
Review Stop AIPP ART IN PUBLIC PLACES
Rev No 3 Status P Date 08-30-2022 Cont ID  
Sent By scwelter Date 08-30-2022 Time 13:40 Rev Time 0.00
Received By scwelter Date   Time   Sent To  
Notes
2022-08-30 13:45:10POTENTIAL PUBLIC ART SITES HAVE BEEN IDENTIFIED ON THE
 LANDSCAPE PLANS.
  
 AT TIME OF BUILDING PERMIT A COMPLETED ART ASSESSMENT
 AND EVIDENCE OF THE 1% ESCROW ARE REQUIRED.
  
 CONTACT SYBILLE WELTER [email protected]
  

Review Stop AIPP ART IN PUBLIC PLACES
Rev No 2 Status F Date 08-02-2022 Cont ID  
Sent By scwelter Date 08-02-2022 Time 11:22 Rev Time 0.00
Received By rrossano Date 08-02-2022 Time 11:24 Sent To  
Notes
2022-08-02 11:23:53IF DEVELOPMENT IS CHOOSING TO PROVIDE ART ON SITE TO
 SATISFY THE PUBLIC ART REQUIREMENT THEN POTENTIAL ART
 SITES MUST BE IDENTIFIED ON THE SITE PLAN. IF DEVELOPER
 IS CHOOSING TO CONTRIBUTE TO THE ART FUND, THEN PLEASE
 EMAIL [email protected]
 FOR SITE PLAN APPROVAL IT IS REQUIRED THAT EITHER
 CHOICE BE STATED CLEARLY.
 IF INTEGRATING ART ON THE SITE IT MUST BE IN AN OPEN,
 PUBLICLY ACCESSIBLE AREA, SUCH AS THE OPEN GRASS AREA
 ON THE DEVELOPMENT SITE.
  

Review Stop AIPP ART IN PUBLIC PLACES
Rev No 1 Status F Date 05-12-2022 Cont ID  
Sent By scwelter Date 05-12-2022 Time 11:35 Rev Time 0.00
Received By scwelter Date 05-12-2022 Time 11:36 Sent To  
Notes
2022-08-02 11:22:33 
  
 IF DEVELOPMENT IS CHOOSING TO PROVIDE ART ON SITE TO
 SATISFY THE PUBLIC ART REQUIREMENT THEN POTENTIAL ART
 SITES MUST BE IDENTIFIED ON THE SITE PLAN. IF DEVELOPER
 IS CHOOSING TO CONTRIBUTE TO THE ART FUND, THEN PLEASE
 EMAIL [email protected]
 FOR SITE PLAN APPROVAL IT IS REQUIRED THAT EITHER
 CHOICE BE STATED CLEARLY.
 IF INTEGRATING ART ON THE SITE IT MUST BE IN AN OPEN,
 PUBLICLY ACCESSIBLE AREA, SUCH AS THE OPEN GRASS AREA
 ON THE DEVELOPMENT SITE.
  
 CONTACT SYBILLE WELTER
 [email protected]
  
2022-05-12 11:36:12PROJECT IS SUBJECT TO PUBLIC ART REQUIREMENT
 PUBLIC ART REQUIREMENT:
 TOTAL CONSTRUCTION COSTS OF THIS DEVELOPMENT ARE OVER
 $500,000 IT IS SUBJECT TO THE PUBLIC ART REQUIREMENT AS
 PER CITY ORDINANCE.
 SECTION 78-129: ALL PRIVATE DEVELOPMENT PROJECTS,
 INCLUDING NEW CONSTRUCTION, OR THE RENOVATION OR
 IMPROVEMENT OF AN EXISTING BUILDING, WHERE TOTAL
 CONSTRUCTION COSTS ARE EQUAL TO OR GREATER THAN
 $500,000 ARE SUBJECT TO THE PUBLIC ART REQUIREMENT.
 OPTION 1: INSTALL ARTWORK ON THE DEVELOPMENT SITE
 VALUED IN AN AMOUNT NOT LESS THAN ONE PERCENT OF THE
 TOTAL CONSTRUCTION COSTS; OR
 OPTION 2: CONTRIBUTE AN AMOUNT EQUAL TO 75 PERCENT OF
 ONE PERCENT OF THE TOTAL CONSTRUCTION COSTS FOR DEPOSIT
 TO THE PUBLIC ART ACCOUNT.
 A COMPLETED PUBLIC ART ASSESSMENT APPLICATION IS
 REQUIRED AT TIME OF BUILDING PERMIT SUBMITTAL.
  
 CONTACT SYBILLE WELTER, ADMINISTRATOR OF PUBLIC ART &
 CULTURE AT [email protected] TO OBTAIN AN ART ASSESSMENT
 APPLICATION AND REVIEW THE REQUIREMENTS.
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 07-19-2022 Cont ID  
Sent By rbrown Date 07-19-2022 Time 15:56 Rev Time 0.00
Received By rbrown Date 07-19-2022 Time 15:56 Sent To  
Notes
2022-07-19 16:12:31DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR THE BUILDING PERMIT APPLICATION.
  
 2. NUMBER OF ACCESSIBLE PARKING SPACES. INFORMATIONAL
 COMMENT. THE PARKING DATA IS NOW SHOWN IN THE VEHICULAR
 PARKING TABLE ON SHEET A0-02. PLEASE NOTE THAT THE
 REQUIRED NUMBER OF VAN ACCESSIBLE PARKING SPACES CAN BE
 PART OF THE TOTAL NUMBER OF ACCESSIBLE SPACES. IT IS
 NOT NECESSARY FOR THE VAN ACCESSIBLE PARKING SPACES TO
 BE IN ADDITION TO THE ACCESSIBLE PARKING SPACES. THE
 MINIMUM NUMBER OF ACCESSIBLE PARKING SPACES PROVIDED
 SHALL BE IN ACCORDANCE WITH FAIR HOUSING ACT AND
 SECTION 208.2 OF FLORIDA ACCESSIBILITY CODE.
  
 3. LOCATION OF ACCESSIBLE PARKING SPACES. NOW ALL OF
 THE ACCESSIBLE PARKING SPACES ARE NOW SHOWN CLOSE TO
 THE RESIDENTIAL TOWERS, AND NONE OF THE ACCESSIBLE
 PARKING SPACES ARE SHOW AS THE CLOSEST PARKING SPACES
 TO THE SOUTH OFFICE/HOTEL/RETAIL BUILDING. THERE ARE
 DOZENS OF REGULAR PARKING SPACES SHOWN CLOSER TO THE
 PARKING GARAGE SOUTH ELEVATOR THAN THE DISTANCE FROM
 THE CLOSEST ACCESSIBLE PARKING SPACE TO THAT ELEVATOR.
 THE ACCESSIBLE PARKING SPACES MUST BE DISTRIBUTED SO
 THAT SOME OF THEM ARE THE CLOSEST PARKING SPACES TO THE
 VARIOUS RETAIL SPACES. PER SECTION 208.3 OF FLORIDA
 ACCESSIBILITY CODE, ACCESSIBLE PARKING SPACES ARE TO BE
 LOCATED ON THE SHORTEST POSSIBLE ROUTE OF TRAVEL FROM
 ADJACENT PARKING TO ACCESSIBLE ENTRANCES. THE DESIGN OF
 ACCESSIBLE PARKING SPACES SHALL COMPLY WITH SECTION 502
 OF FLORIDA ACCESSIBILITY CODE
  
 4. ELECTRIC VEHICLE CHARGING STATION. INFORMATIONAL
 COMMENT. IF ELECTRIC VEHICLE (EV) CHARGING STATIONS ARE
 PROVIDED AT LEAST 1 IN 25 MUST COMPLY WITH ACCESSIBLE
 PARKING SPACE REQUIREMENTS.
  
 5. BUILDING SIZE. INFORMATIONAL COMMENT. WHEN SUBMITTED
 FOR BUILDING PERMIT, THE PLANS SHALL SHOW THAT THE TYPE
 OF CONSTRUCTION FOR THE BUILDINGS WILL BE IN ACCORDANCE
 WITH THE HEIGHT, AREA AND OCCUPANCY LIMITATIONS IN
 CHAPTER 5 OF THE FLORIDA BUILDING CODE.
  
 6. ENCLOSED PARKING GARAGES. INFORMATIONAL COMMENT. IF
 THE PARKING GARAGE DOES NOT HAVE WALL OPENINGS, OR
 SUFFICIENT WALL OPENINGS TO MEET THE DEFINITION OF AN
 OPEN PARKING GARAGE, IT WILL BE CONSIDERED AN ENCLOSED
 PARKING GARAGE AND MUST HAVE EXHAUST SYSTEMS. THE
 EXHAUST SYSTEMS SHALL BE DESIGNED TO MINIMIZE NOISE
 LEVELS USING INLINE FAN SILENCERS OR OTHER APPROVED
 METHODS.
  
 7. GREASE INTERCEPTOR. INFORMATIONAL COMMENT. IF ANY OF
 THE COMMERCIAL SPACES WILL BE OCCUPIED BY RESTAURANTS,
 GREASE INTERCEPTOR(S) WILL BE REQUIRED. FOR INFORMATION
 ON THE REQUIRED TYPE, SIZE AND LOCATION, PLEASE CONTACT
 RYAN BROWN, CHIEF PLUMBING INSPECTOR, DEVELOPMENT
 SERVICES DEPARTMENT, AT (561) 805-6692, OR BY EMAIL:
 [email protected]
  
 8. SEPARATE PERMITS REQUIRED. INFORMATIONAL COMMENT.
 ALL APPLICABLE PERMITS AND SUB-PERMITS MUST BE OBTAINED
 BEFORE COMMENCING THE WORK. SEPARATE PERMITS, PLANS AND
 FEES, ARE REQUIRED FOR SIGNS, SWIMMING POOLS AND SPAS,
 GAS SYSTEMS, GENERATORS, FIRE ALARM SYSTEMS, FIRE
 SPRINKLER AND OTHER FIRE SUPPRESSION SYSTEMS, GREASE
 INTERCEPTORS, SITE LIGHTING, SITE LANDSCAPE, SITE
 IRRIGATION, ETC.
  
 9. CONTRACTOR VEHICLE PARKING. INFORMATIONAL COMMENT.
 PROPERTY OWNER AND CONTRACTOR SHALL MAKE ARRANGEMENTS
 FOR PARKING OF CONTRACTOR VEHICLES TO MINIMIZE THE
 IMPACT ON ALL NEIGHBORING PROPERTIES.
  
 10. PROTECTION OF NEIGHBORING PROPERTY. INFORMATIONAL
 COMMENT. PROPERTY OWNER AND CONTRACTOR SHALL PROTECT
 ALL NEIGHBORING PROPERTY, INCLUDING VEHICLES, FROM
 DAMAGE OR DIRT CAUSED BY THE CONSTRUCTION, AND SHALL
 NOTIFY THE OCCUPANTS OF NEIGHBORING PROPERTIES ABOUT
 ALL STAGES OF CONSTRUCTION THAT MAY AFFECT THE USE OF
 THEIR PROPERTY.
  
 11. BUILDING ADDRESS. INFORMATIONAL COMMENT. EACH
 SEPARATE BUILDING, AND UNIT WITH AN INDEPENDENT
 ENTRANCE FROM THE STREET, SHALL HAVE A SEPARATE ADDRESS
 ASSIGNED BASED ON THE LOCATION OF THE BUILDING
 ENTRANCE. FOR STREET ADDRESSING, CONTACT CAROLINE
 PUELL, ADDRESSING COORDINATOR, AT (561) 805 6659, OR BY
 EMAIL: [email protected]
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 05-11-2022 Cont ID  
Sent By rbrown Date 05-11-2022 Time 20:37 Rev Time 0.00
Received By rbrown Date 05-11-2022 Time 20:37 Sent To  
Notes
2022-05-11 21:05:27DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR THE BUILDING PERMIT APPLICATION.
  
 2. UNITY OF TITLE. FOR ANY BUILDING CROSSING A PROPERTY
 LINE, EITHER A RECORDED UNITY OF TITLE, OR SOME OTHER
 APPROVED LEGAL INSTRUMENT, SHALL BE INCLUDED WITH THE
 PERMIT APPLICATION, OR THE BUILDING MUST HAVE A FIRE
 WALL ALONG THE PROPERTY LINE, PER SECTION 202 OF
 FLORIDA BUILDING CODE, BUILDING, FIRE SEPARATION
 DISTANCE.
  
 3. NUMBER OF ACCESSIBLE PARKING SPACES. THE FLOOR PLANS
 SHOW ACCESSIBLE PARKING SPACES BUT IT APPEARS THAT
 THERE ARE NOT SUFFICIENT BASED ON THE PROPSED 2,003
 TOTAL PARKING SPACES. TTHE PARKING DATA TABLE ON ZONING
 & PROJECT DATA DRAWING, SHEET A0-02, DOES NOT SHOW THE
 COUNT FOR ACCESSIBLE PARKING SPACES. THE MINIMUM NUMBER
 OF ACCESSIBLE PARKING SPACES PROVIDED SHALL BE IN
 ACCORDANCE WITH FAIR HOUSING ACT AND SECTION 208.2 OF
 FLORIDA ACCESSIBILITY CODE.
  
 4. LOCATION OF ACCESSIBLE PARKING SPACES. NONE OF THE
 ACCESSIBLE PARKING SPACES ARE CLOSE TO THE RESIDENTIAL
 TOWERS. PER SECTION 208.3 OF FLORIDA ACCESSIBILITY
 CODE, ACCESSIBLE PARKING SPACES ARE TO BE LOCATED ON
 THE SHORTEST POSSIBLE ROUTE OF TRAVEL FROM ADJACENT
 PARKING TO ACCESSIBLE ENTRANCES. THE DESIGN OF
 ACCESSIBLE PARKING SPACES SHALL COMPLY WITH SECTION 502
 OF FLORIDA ACCESSIBILITY CODE
  
 5. VAN ACCESSIBLE PARKING SPACES. NONE OF THE
 ACCESSIBLE PARKING SPACES ARE MARKED VAN ACCESSIBLE.
 PER SECTION 208.2.4 OF FLORIDA ACCESSIBILITY CODE, ONE
 IN EVERY SIX REQUIRED ACCESSIBLE SPACES (AT LEAST ONE)
 IN A PARKING STRUCTURE, SHALL BE ?VAN ACCESSIBLE? AND
 DESIGNED IN ACCORDANCE WITH SECTION OF 502 OF FLORIDA
 ACCESSIBILITY CODE (VERTICAL CLEARANCE NOT LESS THAN 98
 INCHES AT SPACE AND VEHICULAR ACCESS ROUTE)
  
 6. ELECTRIC VEHICLE CHARGING STATION. IF ELECTRIC
 VEHICLE (EV) CHARGING STATIONS ARE PROVIDED AT LEAST 1
 IN 25 MUST COMPLY WITH ACCESSIBLE PARKING SPACE
 REQUIREMENTS.
  
 7. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT,
 THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR
 THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT,
 AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE
 FLORIDA BUILDING CODE.
  
 8. ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE DOES
 NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL OPENINGS TO
 MEET THE DEFINITION OF AN OPEN PARKING GARAGE, IT WILL
 BE CONSIDERED AN ENCLOSED PARKING GARAGE AND MUST HAVE
 EXHAUST SYSTEMS. THE EXHAUST SYSTEMS SHALL BE DESIGNED
 TO MINIMIZE NOISE LEVELS USING INLINE FAN SILENCERS OR
 OTHER APPROVED METHODS.
  
 9. GREASE INTERCEPTOR. IF ANY OF THE COMMERCIAL SPACE
 WILL BE OCCUPIED BY RESTAURANTS, GREASE INTERCEPTOR(S)
 WILL BE REQUIRED. FOR INFORMATION ON THE REQUIRED TYPE,
 SIZE AND LOCATION, PLEASE CONTACT RYAN BROWN, CHIEF
 PLUMBING INSPECTOR, DEVELOPMENT SERVICES DEPARTMENT, AT
 (561) 805-6692, OR BY EMAIL: [email protected]
  
 10. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS,
 GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND
 OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS,
 SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC.
  
 11. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND
 CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF
 CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL
 NEIGHBORING PROPERTIES.
  
 12. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER
 AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY,
 INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE
 CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF
 NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION
 THAT MAY AFFECT THE USE OF THEIR PROPERTY.
  
 13. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT
 WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL
 HAVE A SEPARATE ADDRESS ASSIGNED BASED ON THE LOCATION
 OF THE BUILDING ENTRANCE. FOR STREET ADDRESSING,
 CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT
 (561) 805 6659, OR BY EMAIL: [email protected]
  
 14. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT
 TO ART LIFE ASSESSMENT UNDER THE CITY OF WEST PALM
 BEACH ART IN PUBLIC PLACES (AIPP) PROGRAM. FOR ADVICE
 ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP
 ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC
 PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL:
 [email protected]
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 4 Status P Date 08-01-2022 Cont ID  
Sent By rrossano Date 08-01-2022 Time   Rev Time 0.00
Received By rrossano Date 08-01-2022 Time   Sent To  
Notes
2022-08-01 09:44:30PLEASE PROVIDE CCTV OF EXISTING SANITARY AND STORMWATER
 INFRASTRUCTURE ALONG PROJECT FRONTAGE AS PREVIOUSLY
 REQUESTED. IT IS A REQUIREMENT OF SITE PLAN APPROVAL.
  
 THANKS,
 RICK ROSSANO
 SENIOR PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT AT 561-494-1098
 [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 3 Status F Date 07-20-2022 Cont ID  
Sent By RROSSANO Date 07-20-2022 Time   Rev Time 0.00
Received By rrossano Date 07-20-2022 Time   Sent To  
Notes
2022-07-21 09:48:28 
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 2 Status F Date 07-01-2022 Cont ID  
Sent By rrossano Date 07-01-2022 Time   Rev Time 0.00
Received By rrossano Date 07-01-2022 Time   Sent To  
Notes
2022-07-01 16:26:07Z22040014 - TRANSIT VILLAGE - 150 CLEARWATER ? 6.15.22
 RESUB
  
 COMMENTS FROM RICK ROSSANO, SR. PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPARTMENT AT 561-494-1098
 [email protected]
 O PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND
 STORMWATER INFRASTRUCTURE ALONG ENTIRE PROJECT
 FRONTAGE.
 (REPEATED COMMENT ? THIS IS A REQUIREMENT FOR SITE PLAN
 APPROVAL.)
 COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES,
 561-822-2262 OR [email protected]
 -IR510 SPECIFIES FEBCO 825Y RPZ. IF THAT IS A
 CONTAINMENT BACKFLOW ASSEMBLY, THEN IT MUST BE LEAD
 FREE. LF825Y IS THE LEAD FREE VERSION. PLEASE UPDATE
 IR510 AS NEEDED.
  
 -EXISTING 12 INCH WATER MAIN ON SHEET C08 TRYING TO USE
 FOR NEW WATER SERVICES SEEMS TO BE CONNECTED TO 36 INCH
 WATER MAIN. IF SO, CONNECTION WOULD NEED BE MAINTAINED
 AND WATER SERVICE DESIGN ALTERED. EOR NEED INVESTIGATE
 FURTHER AT FORMAL ENGINEERING SUBMITTAL.
  
 -PROVIDE LANDSCAPING PLAN THAT SHOWS UPDATED UTILITY
 AND TREE LOCATIONS ON ONE SHEET, SO CAN VERIFY NO
 CONFLICTS BETWEEN THEM.
  
 -ADDITIONAL UTILITY EASEMENTS ARE NEEDED FOR PROPOSED
 WATER SERVICES ON SHEETS C08 AND C09.
  
 -SEWER LATERAL ON SHEET C09 LABELED AS 8 INCH, BUT SAYS
 6 INCH CONNECTION AT MAIN. PLEASE VERIFY SIZING.
  
 -SHEET C09 ENLARGED VIEW SAYS THERE IS AN 8 BY 6 TEE ON
 THE 8 INCH FIRELINE. PLEASE VERIFY AND CORRECT AS
 NEEDED.
  
 -VERIFY WELLS WILL NOT BE CONNECTED TO PRIVATE FIRE
 SYSTEM.
  
 -EXISTING WATER METER BOX NEAR SOUTHWEST AREA OF
 PROPERTY IS CURRENTLY LOCATED IN GRASS. SEE IF CAN
 RELOCATE IT TO PARKWAY OUT OF PEDESTRIAN TRAFFIC
 HARDSCAPE AND SUFFICIENTLY DISTANCED FROM TREES.
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status F Date 05-09-2022 Cont ID  
Sent By rrossano Date 05-09-2022 Time   Rev Time  
Received By rrossano Date 05-09-2022 Time   Sent To  
Notes
2022-05-09 11:39:42COMMENTS FROM RICK ROSSANO, SR. PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPARTMENT AT 561-494-1098
 [email protected]
 O PLEASE RESPOND TO ALL COMMENTS IN WRITING, AND
 INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER
 (Z-XXXXXXXX).
 O THE CITY OF WEST PALM BEACH HAS A NUMBER OF
 REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY
 AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND
 WASTEWATER UTILITIES WITHIN THE CITY. PLEASE SEE
 DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AT THE LINK
 BELOW:
 A. HTTP://WPB.ORG/CMSPAGES/GETAMAZONFILE.ASPX?PATH=~\WP
 B_WEBSITE\MEDIA\ENGINEERING\DEVELOPMENT-APPLICATION-FUL
 L-PACKAGE_2016.PDF&HASH=7BD4DD7EB6115181D8C5977BCC02A97
 B1960045731D3658206F27451722716EF
 B. THIS AND OTHER RELATED ENGINEERING DOCUMENTS CAN BE
 FOUND HERE:
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
 C. ALSO SEE: CODE OF ORDINANCES, CITY OF WEST PALM
 BEACH, FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08,
 ADOPTED SEPT. 22, 2008. (SUPPLEMENT NO. 18)
 CHAPTER 90 UTILITIES, ARTICLE I. IN GENERAL,
 SEC. 90-7. POLICY REGARDING EXTENSION OF WATER OR SEWER
 SERVICE FACILITIES OF THE CITY.
 THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE
 CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY
 BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS,
 BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION.
 O AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR
 MORE INFORMATION, REFER TO THE LINK BELOW:
 A. HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PU
 BLICATIONS/BACKFLOW-CROSS-CONNECTION- CONTROL-MANUAL
 O PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY
 OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC
 RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF
 YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE
 MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL
 IN THE WPB ENGINEERING SERVICES DEPARTMENT AT
 [email protected] OR 561-494-1079 FOR FURTHER
 ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION
 ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD
 SURVEY, POT-HOLING, SOFT DIGS ETC.
 O PLEASE PROVIDE CALCULATIONS OF PERVIOUS AND
 IMPERVIOUS AREAS FOR PROPOSED IMPROVED AREAS.
 O PLEASE CORRECT TITLE BLOCKS ON ALL CIVIL SHEETS.
 BACKFLOW ASSEMBLY AND METERS:
 O SHOW AND LABEL ANY EXISTING OR PROPOSED WATER
 SERVICES AND WATER METERS, ALONG WITH WHAT IS HAPPENING
 TO THEM.
 O SHOW EXISTING AND PROPOSED DEDICATED UTILITY
 EASEMENTS TO ALLOW ACCESS FOR CITY PERSONNEL TO
 PROPOSED UTILITY WATER METERS. VERIFY THAT THERE ARE NO
 STRUCTURES WITHIN EASEMENT.
 O PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED LOCATION
 OF WATER METER AND BACKFLOW
 PREVENTION.
 O BACKFLOWS SHALL BE INSTALLED ON PRIVATE PROPERTY
 OUTSIDE OF EASEMENTS AND RIGHTS OF WAY. DOMESTIC WATER
 METERS SHALL BE INSTALLED IMMEDIATELY ADJACENT TO
 PROPERTY LINE. 3 INCH AND LARGER WATER METERS SHALL BE
 INSTALLED ABOVE-GROUND ONLY.
 O CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA (MAKE
 NOTE USC APPROVED) AND FIRE BACKFLOW PREVENTER AS DCDA.
  
 WATER/WASTEWATER PLAN:
 O PROVIDE VERTICAL DATUM AND DATUM CONVERSION
 INFORMATION (NAVD 1988 AND NGVD 1929).
 O SHOW PROJECT ADDRESS ON ALL PLAN SHEETS.
 O PROVIDE LEGEND ON ALL PLAN SHEETS TO INCLUDE
 STREETLIGHT, SIGN POSTS, TRANSFORMER BOXES ETC.
 O PLANS SHALL SHOW EXISTING AND PROPOSED LOCATIONS AND
 DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND
 SEWER LINES AND CLEANOUTS, INCLUDING STUBS TO EACH
 PROPERTY LINE FOR WATER AND SANITARY SEWERS, THE MAKE
 AND MODEL OF ALL VALVES, POTABLE AND IRRIGATION METERS,
 BACKFLOWS, FIRE HYDRANTS AND FDCS, AND OTHER DEVICES TO
 BE INSTALLED ON THE SYSTEM, CATCH BASINS, CULVERTS,
 DITCHES INCLUDING GRADES, PIPES SIZES, MATERIALS,
 ELEVATIONS, ASSUMPTIONS, CALCULATIONS, INVERT
 ELEVATIONS FOR ALL INLETS AND MANHOLES AND PROFILES OF
 SANITARY SEWER LINES.
 O GATE VALVE BOXES SHALL NOT BE INSTALLED IN CURB OR
 SIDEWALK. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE
 PROFILE VIEW.
 O DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN
 VIEW FOR ALL SANITARY AND STORM SEWERS.
 O SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL.
 O PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED
 UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC,
 ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION
 FACILITIES LOCATED ON THE RIGHT-OF-WAY.
 O PROVIDE PROFILE AND CLEARANCES BETWEEN WATER, SEWER
 AND STORM LINES PER CITY OF WEST PALM BEACH STANDARD
 DETAIL GN-2 SERIES, AT ALL UTILITY CROSSINGS.
 O SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE DIRECTLY
 TO ENGINEERING (SHEET 33 OF CITY OF WPB DEVELOPMENT
 APPLICATION). PROVIDE CALCULATIONS ON PLANS OF EXISTING
 AND PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE,
 MAXIMUM AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS
 SHALL BE PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008
 FOR WATER.
 O PROVIDE FIRE FLOW TEST DATA.
 O PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND
 STORMWATER INFRASTRUCTURE ALONG ENTIRE PROJECT
 FRONTAGE.
 O CUT AND CAP UTILITIES NOT IN USE AND REMOVE ANY
 ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY
 ROW.
 O WHEN PROPOSED, WATER MAINS IN CITY RIGHT OF WAY SHALL
 BE MADE OF DUCTILE IRON PIPE (NOT PVC) AND SPECIFY
 PROPOSED LENGTH IN FEET.
 O CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY
 SEWER ARE REQUIRED.
 O PROVIDE CLEANOUTS FOR PROPOSED SANITARY LINE ONSITE
 JUST INSIDE PROPERTY LINE, AT JOINTS AND EVERY 75 FEET.
 O ADD NOTE TO PLANS SPECIFYING CITY?S DOWNSTREAM LIFT
 STATION NUMBER.
 O PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR
 PROPOSED SANITARY LATERALS.
 O LABEL WATER LINES AS PRIVATE WHERE APPLICABLE.
 O PLEASE SHOW AND LABEL EXISTING AND PROPOSED GREASE
 TRAPS (IF ANY).
 O PER CITY STANDARDS MAINTAIN MINIMUM DISTANCE BETWEEN
 OUTSIDE DIAMETER OF CITY PIPE AND ROOT BARRIER.
 FORMAL ENGINEERING REVIEW:
 O FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND NPDES
 NOI REQUIREMENTS WILL BE ENFORCED.
 - AN NOI IS REQUIRED FOR PROJECTS THAT:
 - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS
 THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF
 DEVELOPMENT OR SALE;
 - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE
 STATE OR TO SURFACE WATERS OF THE STATE THROUGH A
 MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4).
 - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF
 CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION
 THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL
 SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT
 OF THE 10-2 CERTIFICATION.
 O FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 EASEMENT FOR PLACEMENT OF PROPOSED WATER METERS.
 O FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES OF
 WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS.
 O FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING
 APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT
 SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING
 SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED
 LEAD-FREE DESIGN.
 O FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY LINES
 ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY
 LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT
 PARCELS.
 O FOR FORMAL ENGINEERING SUBMITTAL, IF WATER LINES ARE
 BEING REPLACED IN ROW, SHOW ADJACENT PARCEL ADDRESSES.
 O FOR FORMAL ENGINEERING SUBMITTAL, ADD NOTE TO PROVIDE
 50 FT. PAVEMENT RESTORATION TRANSITION ON EACH SIDE OF
 PROPOSED TRENCH IN CITY MAINTAINED ROADWAY AREAS PER
 CITY OF WPB STANDARD DETAIL GC-8.
  
 COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES,
 561-822-2262 OR [email protected]
 -BUILDING IS SHOWN IN EXISTING FIRE EMERGENCY ACCESS
 EASEMENT. VERIFY THAT IS ALRIGHT.
  
 -A WELL AND LIFT STATION WERE SHOWN ON SURVEY. WILL
 THEY REMAIN?
  
 -CLEARLY SHOW AND LABEL EXISTING METERED WATER SERVICE
 AND BACKFLOW ASSEMBLY FOR THE PROPERTY THAT ARE NEAR
 THE BUS ENTRANCE ON CIVIL PLANS.
  
 -CLEARLY SHOW AND LABEL EXISTING FORCE MAIN AND WATER
 MAIN NEAR ENTIRE LENGTH OF WEST PROPERTY LINE ON CIVIL
 PLANS.
  
 -SHEET C09 SHOWS WHAT APPEARS TO BE A FIRE HYDRANT
 BLOCKING USE CROSSWALK.
  
 -SURVEY REPORT NOTE 5 SAYS THAT NO SEARCH OF PUBLIC
 RECORDS HAS BEEN PERFORMED. WHEN WILL IT BE PERFORMED?
  
 -L110 SHOWS STOP BAR IN POSITION THAT MAY BLOCK
 CROSSWALK. VERIFY LOCATION IS ACCEPTABLE.
  
 -ENSURE THAT NO TREES WILL BE IN WATER LINE EASEMENT.
 ALSO ENSURE NO TREES WILL BE CLOSER THAN 5 HORIZONTAL
 FEET FROM CITY WATER AND SEWER UTILITIES.
  
 -ON CIVIL PLAN SHOW AND LABEL ALL GREASE TRAPS.
  
 -PART OF THE NORTH BUILDING APPEARS TO BE ENCROACHING
 INTO SETBACK. IS THAT ALRIGHT?
  
 -ADA PLAN SHOWS PATH GOING THROUGH COLUMNS, TREES,
 GRASS, AND CROSSWALKS THAT ARE LABELED TO BE REMOVED.
  
 -SOUTH OPEN SPACE AREA SAYS IT IS GATED AND FENCED.
 WHEN TIMES WILL GATE BE CLOSED?
  
 -SOME OF THE COLUMNS LOOK LOCATED AGAINST BUILDING
 WALLS. IS ANY CLEARANCE DISTANCE NEEDED BETWEEN THEM?
  
 -LANDSCAPING PLAN L110 SHOWS GRASS AT THE END OF
 CROSSWALKS.
  
 -MOTOR LOBBY DOOR PATH SEEMS LIKE IT BLOCKS MOST OF
 SIDEWALK. IS THAT ALRIGHT?
  
 -THERE IS A SEWER LINE AND CLEANOUT THAT ENCROACHES
 INTO A COLUMN AND FOOTER.
  
 -DID PLAN DESIGN TAKE INTO ACCOUNT BANYAN STREETSCAPE
 PROJECT THAT IS BEING CONSTRUCTED NOW?
  
 -VERIFY PROPOSED 4 INCH PVC PRIVATE FORCE MAIN IS
 SUFFICIENT SIZE. ALSO VERIFY EXISTING 6 INCH DIP
 FORCEMAIN HAS ENOUGH CAPACITY AS THERE ARE A COUPLE
 SUBSTANTIAL BUILDING PROJECTS STARTED IN AREA.
  
 -UTILITY MAINTENANCE MAY SOMETIMES IMPEDE USE OF MAIN
 BUILDING ENTRANCE/EXIT BECAUSE IT IS LOCATED IN WATER
 LINE EASEMENT, THERE ARE EXISTING UTILITIES NEAR IT,
 AND PROPOSING ADDITIONAL UTILITY INFRASTRUCTURE THERE.
  
 -THERE ARE MANY EASEMENTS ON THE PROPERTY SUCH AS FPL,
 FIBER OPTIC, CROSS ACCESS, POLE LINE. FOR ANY EASEMENTS
 WHERE STRUCTURES ARE BEING BUILT, VERIFY THAT IS
 ACCEPTABLE WITH EASEMENT PROVISIONS.
  
 -DOES THE PURCHASE AND SALE AGREEMENT SPECIFY WHO OWNS
 AND MAINTAINS THE COLUMNS AND FOOTERS IN THE ITC
 PROPERTY? ALSO DOES THE AGREEMENT SPECIFY ANY CROSS
 ACCESS, OR USE OF ANY SHARED UTILITIES.
  
 -THE 6 INCH DOMESTIC METER LOCATIONS ARE NOT
 ACCEPTABLE. THEY NEED TO BE LOCATED ADJACENT TO THE
 PROPERTY LINE WITHOUT EXCESSIVE SERVICE LINE LENGTH.
 ALSO SHOW AND LABEL THE DOMESTIC BACKFLOW ASSEMBLIES
 NEAR THEM.
  
 -ON CIVIL PLANS, SHOW AND LABEL 10 INCH WATER MAIN
 RUNNING NEAR NORTHWEST AREA OF PROPERTY.
  
 -C08 SHOWS GUY WIRE IN RUN LANE OF DRIVEWAY.
  
 -THE LOCATIONS OF FIRELINE BACKFLOW ASSEMBLIES ARE NOT
 ACCEPTABLE DUE TO THE DISTANCE FROM THE TAPS AND
 EXCESSIVE PIPE LENGTHS BETWEEN THEM.
  
 -ON L112, SHOW WATER AND SEWER UTILITIES AND VERIFY
 TREES ARE DISTANCED AT LEAST FIVE FEET FROM THEM.
  
 -ONE FDC LOCATION APPEARS IN MIDDLE OF SIDEWALK.
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 05-06-2022 Cont ID  
Sent By pleduc Date 05-06-2022 Time   Rev Time 0.00
Received By pleduc Date 05-04-2022 Time 12:57 Sent To  
Notes
2022-05-06 10:56:15THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC,
 FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM
 BEACH FIRE RESCUE.
  
 THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE
 DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE.
 ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS
 ARE SUBMITTED FOR PERMIT.
  
 THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE
 PROPOSED PROJECT; HOWEVER, THE FOLLOWING COMMENTS ARE
 PROVIDED AND MAY NEED FURTHER CLARIFICATIONS WHERE
 APPLICABLE.
  
 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY
 WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE
 PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A
 PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED
 TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN
 STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY
 MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER
 PROTECTION.
  
 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY
 IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING
 ALL CONSTRUCTION ACTIVITIES.
  
 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM
 ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION.
 ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND
 AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT
 WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS.
  
 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE
 REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE
 ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS.
  
 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH
 THE 7TH EDITION OF THE FLORIDA FIRE PREVENTION CODE,
 INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES.
  
 6. ALL PARKING STRUCTURES SHALL COMPLY WITH NFPA 88A,
 PARKING STRUCTURES AND NFPA 101, THE LIFE SAFETY CODE,
 INCLUDING MORE SPECIFICALLY, CHAPTER 42 STORAGE
 OCCUPANCIES (PARKING STRUCTURES)
  
 7. FOR PROJECT PLAN REVIEW PURPOSES THE FIRE PROTECTION
 OF THESE INDIVIDUAL HIGH RISES GREATER DETAIL WILL BE
 NEEDED ON HOW EACH INDIVIDUAL BUILDING IS SUPPLIED AND
 PROTECTED.I.E, FIRE PUMP(S), FIRE ALARM(S), FIRE
 COMMAND ROOM(S), ETC.
  
 A NFPA 13 COMPLAINT FIRE SPRINKLER SYSTEM AND NFPA 14
 COMPLIANT WET STANDPIPE SYSTEM ARE REQUIRED FOR THIS
 STRUCTURE. TEMPORARY STANDPIPES ARE REQUIRED WHEN THE
 BUILDING REACHES THREE LEVELS OR THIRTY FEET WHILE
 BEING CONSTRUCTED.
  
 SEPARATE SHOP DRAWINGS, ARE REQUIRED TO BE SUBMITTED,
 REVIEWED AND APPROVED BY THE FIRE PREVENTION BUREAU
 PRIOR TO ANY INSTALLATION.
  
 IT IS RECOMMENDED FOR HIGH RISES HAVE TWO SEPARATE FDC
 LOCATIONS REMOTELY LOCATED.
  
 ONLY ONE FDC WAS IDENTIFIED FOR THE ENTIRE PROJECT.
  
 7A. PER NFPA 14
  
 6.4.5.4* FIRE DEPARTMENT CONNECTIONS SHALL BE LOCATED
 NOT MORE THAN 100 FT (30.5 M) FROM THE NEAREST FIRE
 HYDRANT CONNECTED TO AN APPROVED WATER SUPPLY.
  
 ONLY 1 FIRE HYDRANT WAS IDENTIFIED FOR THE ENTIRE
 PROEJECT.
  
  
 7B. PER NFPA 1
  
 18.3 WATER SUPPLIES.
 18.3.1* AN APPROVED WATER SUPPLY CAPABLE OF SUPPLYING
 THE REQUIRED FIRE FLOW FOR FIRE PROTECTION SHALL BE
 PROVIDED TO ALL PREMISES UPON WHICH FACILITIES,
 BUILDINGS, OR PORTIONS OF BUILDINGS ARE HEREAFTER
 CONSTRUCTED OR MOVED INTO THE JURISDICTION. THE
 APPROVED WATER SUPPLY SHALL BE IN ACCORDANCE WITH
 SECTION 18.4.
  
 PER FLORIDA ADMINISTRATIVE CODE SECTION 61G15-32.004,
 FIRE PROTECTION ENGINEERING DOCUMENTS SHALL INCLUDE THE
 POINT OF SERVICE FOR THE WATER SUPPLY, A LIST OF
 APPLICABLE NFPA STANDARDS APPLICABLE TO THE PROJECT,
 CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR
 AREA, SUPPRESSION SYSTEM TYPE, DESIGN DENSITIES, WATER
 SUPPLY DATA (FIRE PUMP DATA, HYDRANT FLOW TEST DATA)
 AND ANY PERFORMANCE BASED INFORMATION SUCH AS
 PRE-ENGINEERED SYSTEMS.
  
 FOR THE PROPOSED FIRE PUMP(S) , WHAT IS(ARE) THE
 PRIMARY AND SECONDARY POWER SOURCES?
  
  
 7C. THE LOCATION OF THE DDCV FIRE LINE LOCATION SHALL
 MEET THE REQUIREMENTS OF NFPA 24 AND SHALL BE
 COORDINATED WITH THE OFFICE OF FIRE MARSHAL, THE CITY'S
 ENGINEERS OFFICE, THE LANDSCAPE PLANNER, AND THE CITY'S
 PLANNING AND ZONING OFFICE.
  
  
 8. A CLASS ?A? NFPA 72 COMPLIANT MONITORED FIRE ALARM
 SYSTEM IS REQUIRED FOR THIS STRUCTURE. SEPARATE SHOP
 DRAWINGS, ARE REQUIRED TO BE SUBMITTED, REVIEWED AND
 APPROVED BY THE FIRE PREVENTION BUREAU PRIOR TO ANY
 INSTALLATION.
  
  
 9. ALL ELEVATORS SHALL BE EQUIPPED WITH A REGION 7
 KEYWAY SYSTEM.
  
 ALL NEW ELEVATORS SHALL CONFORM TO THE FIRE FIGHTER?S
 EMERGENCY OPERATIONS REQUIREMENTS OF ASME A17.1/CSA
 B44, SAFETY CODE FOR ELEVATORS.
  
 ANY BUILDING THAT IS MORE THAN THREE STORIES HIGH OR IN
 WHICH THE VERTICAL DISTANCE BETWEEN THE BOTTOM TERMINAL
 LANDING AND THE TOP TERMINAL LANDING EXCEEDS 25 FEET
 MUST BE CONSTRUCTED TO CONTAIN AT LEAST ONE PASSENGER
 ELEVATOR THAT IS OPERATIONAL AND WILL ACCOMMODATE AN
 AMBULANCE STRETCHER 76 INCHES LONG AND 24 INCHES WIDE
 IN THE HORIZONTAL POSITION.
  
  
 10. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL
 BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL
 DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS,
 EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A
 PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE
 SAFETY FEATURES AND EQUIPMENT.
  
 11. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS
 DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED
 ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF
 FIRE PREVENTION.
  
 ALL NEW FIRE HYDRANTS AND FDC?S PLANNED FOR THIS
 DEVELOPMENT SHALL BE CLOSELY COORDINATED WITH THE
 BUREAU OF FIRE PREVENTION. PROPOSED FIRE HYDRANTS AND
 FDC?S SHOULD BE LOCATED ON THE SAME SIDE OF THE STREET
 OR ACCESS ROADWAY TO ALLOW FREE ACCESS FOR OTHER
 ARRIVING EMERGENCY VEHICLES.
  
  
 12. COMMAND ROOM
  
 THE FIRE COMMAND CENTER SHALL COMPLY WITH NFPA 1,
 CHAPTER 11, BUILDING SERVICES; 11.9 AND SHALL CONTAIN
 THE FOLLOWING FEATURES:
  
 11.9.1 THE LOCATION, DESIGN, CONTENT, AND FIRE
 DEPARTMENT ACCESS OF THE EMERGENCY COMMAND CENTER SHALL
 BE APPROVED BY THE FIRE DEPARTMENT.
  
 11.9.2 THE EMERGENCY COMMAND CENTER SHALL BE SEPARATED
 FROM THE REMAINDER OF THE BUILDING BY A FIRE BARRIER
 HAVING A FIRE RESISTANCE RATING OF NOT LESS THAN 1
 HOUR.
  
 11.9.3 THE EMERGENCY COMMAND CENTER ROOM SHALL BE A
 MINIMUM OF 200 FT2 (19 M2) WITH A MINIMUM DIMENSION OF
 10 FT (3050 MM).
  
 11.9.4 THE FOLLOWING SHALL BE PROVIDED IN THE EMERGENCY
 COMMAND CENTER.
 (1) THE FIRE DEPARTMENT COMMUNICATIONS SYSTEM.
 (2) A TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED
 ACCESS TO THE PUBLIC TELEPHONE SYSTEM
 (3) SCHEMATIC BUILDING PLANS INDICATING THE TYPICAL
 FLOOR PLAN AND DETAILING THE BUILDING CORE, MEANS OF
 EGRESS, FIRE PROTECTION SYSTEMS, FIRE-FIGHTING
 EQUIPMENT AND FIRE DEPARTMENT ACCESS
 (4) WORK TABLE.
 (5) IF APPLICABLE, A HAZARDOUS MATERIAL MANAGEMENT PLAN
 FOR THE BUILDING.
 11.9.5 WHERE OTHERWISE REQUIRED, THE FOLLOWING DEVICES
 OR FUNCTIONS SHALL BE PROVIDED WITHIN THE EMERGENCY
 COMMAND CENTER.
 (1) THE EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM
 CONTROL UNIT.
 (2) FIRE DETECTION AND ALARM SYSTEM ANNUNCIATOR UNIT.
 (3) ANNUNCIATOR UNIT VISUALLY INDICATING THE LOCATION
 OF THE ELEVATORS AND WHETHER THEY ARE OPERATIONAL
 (4) STATUS INDICATORS AND CONTROLS FOR AIR-HANDLING
 SYSTEMS.
 (5) CONTROLS FOR UNLOCKING STAIRWAY DOORS
 SIMULTANEOUSLY
 (6) SPRINKLER VALVE AND WATER FLOW DETECTOR DISPLAY
 PANELS
 (7) EMERGENCY AND STANDBY POWER STATUS INDICATORS
 (8) FIRE PUMP STATUS INDICATORS
 (9) GENERATOR SUPERVISION DEVICES AND MANUAL START AND
 TRANSFER FEATURES.
 (10) PUBLIC ADDRESS SYSTEM, WHERE SPECIFICALLY REQUIRED
 BY OTHER SECTIONS OF THIS CODE
 (11) CONTROLS REQUIRED FOR SMOKE CONTROL
  
 NFPA 101
  
 11.8.6* EMERGENCY COMMAND CENTER.
  
 11.8.6.1 AN EMERGENCY COMMAND CENTER SHALL BE PROVIDED
 IN A
 LOCATION APPROVED BY THE FIRE DEPARTMENT.
  
 11.8.6.2 THE EMERGENCY COMMAND CENTER SHALL CONTAIN THE
 FOLLOWING:
 (1) VOICE FIRE ALARM SYSTEM PANELS AND CONTROLS
 (2) FIRE DEPARTMENT TWO-WAY TELEPHONE COMMUNICATION
 SERVICE
 PANELS AND CONTROLS WHERE REQUIRED BY ANOTHER SECTION
 OF THIS
 CODE
 (3) FIRE DETECTION AND FIRE ALARM SYSTEM ANNUNCIATION
 PANELS
 (4) ELEVATOR FLOOR LOCATION AND OPERATION ANNUNCIATORS
 (5) ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME
 A17.1/CSA B44, SAFETY CODE FOR ELEVATORS AND ESCALATORS
 (6) ELEVATOR EMERGENCY POWER SELECTOR SWITCH(ES) WHERE
 PROVIDED
 IN ACCORDANCE WITH ASME A17.1/CSA B44
 (7) SPRINKLER VALVE AND WATERFLOW ANNUNCIATORS
 (8) EMERGENCY GENERATOR STATUS INDICATORS
 (9) CONTROLS FOR ANY AUTOMATIC STAIRWAY DOOR UNLOCKING
 SYSTEM
 (10) FIRE PUMP STATUS INDICATORS
 (11) TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED
 ACCESS TO THE
 PUBLIC TELEPHONE SYSTEM
 (12) STAIRWAY VIDEO MONITORING EQUIPMENT AS REQUIRED BY
 11.8.8
  
  
 13. TWO-WAY RADIO COMMUNICATIONS ENHANCEMENT SYSTEMS.
  
 NFPA 1, CHAPTER 11, BUILDING SERVICES; 11.10 TWO-WAY
 RADIO ENHANCEMENT SERVICES.
  
 11.10.1 IN ALL NEW AND EXISTING BUILDINGS, MINIMUM
 RADIO SIGNAL STRENGTH FOR FIRE DEPARTMENT
 COMMUNICATIONS SHALL BE MAINTAINED AT A LEVEL
 DETERMINED BY THE AHJ.
  
 NFPA 72, 24.9 TWO-WAY RADIO COMMUNICATIONS ENHANCEMENT
 SYSTEMS.
 24.9.1 GENERAL.
  
 24.9.1.1 NON-INTERFERENCE. NO AMPLIFICATION SYSTEM
 CAPABLE
 OF OPERATING ON FREQUENCIES OR CAUSING INTERFERENCE ON
 FREQUENCIES
 ASSIGNED TO THE JURISDICTION BY THE FCC SHALL BE
 INSTALLED
 WITHOUT PRIOR COORDINATION AND APPROVAL OF THE
 AUTHORITY
 HAVING JURISDICTION. THE BUILDING MANAGER/OWNER SHALL
 SUSPEND AND CORRECT OTHER EQUIPMENT INSTALLATIONS THAT
 DEGRADE
 THE PERFORMANCE OF THE PUBLIC SAFETY RADIO SYSTEM OR
 PUBLIC SAFETY RADIO ENHANCEMENT SYSTEM.
  
 24.9.1.2 APPROVAL AND PERMIT. PLANS SHALL BE SUBMITTED
 FOR
 APPROVAL PRIOR TO INSTALLATION. AT THE CONCLUSION OF
 SUCCESSFUL
 ACCEPTANCE TESTING, A RENEWABLE PERMIT SHALL BE ISSUED
 FOR THE
 PUBLIC SAFETY RADIO ENHANCEMENT SYSTEM WHERE REQUIRED
 BY
 THE AUTHORITY HAVING JURISDICTION.
  
 THE SYSTEM SHALL MAINTAIN A MINIMUM RADIO SIGNAL
 STRENGTH OF -105 DBM FOR THE RADIO SYSTEM USED BY WEST
 PALM BEACH FIRE DEPARTMENT. TESTING SHALL BE BY AN
 ACCEPTABLE NATIONAL STANDARD DOCUMENTING PERCENTAGES
 NOTED ABOVE AND BY ACTUAL RADIO TESTING BY FIRE
 PERSONNEL. IF THE MINIMUM CANNOT BE MAINTAINED, A
 BI-DIRECTIONAL AMPLIFIED SYSTEM SHALL BE INSTALLED WITH
 A MINIMUM 2-HOUR RUN TIME BATTERY BACK-UP.
  
 AT THE APPLICABLE TIME PLEASE CONTACT MARK FILLA, PALM
 BEACH COUNTY PUBLIC SAFETY RADIO SYSTEMS MANAGER,
 [email protected], 561-233-0837; AS OUR RADIOS OPERATE
 ON THEIR SYSTEM FOR DETAILED RADIO FREQUENCY AND
 INSTALLATION INSTRUCTIONS.
  
  
 14. KNOX-BOX KEY SYSTEM SHALL BE REQUIRED FOR THES
 BUILDINGS.
  
 ANY GATES SHALL BE PROVIDED WITH KNOX KEY SWITCHES FOR
 24 HOUR EMERGENCY ACCESS.
  
  
 15. THE SMOKE CONTROL SYSTEM SHALL COMPLY WITH NFPA
 101, CHAPTER 9, BUILDING SERVICE AND FIRE PROTECTION
 EQUIPMENT, INCLUDING:
  
 THE SMOKE CONTROL SYSTEMS SHALL BE INSTALLED,
 INSPECTED, TESTED, AND MAINTAINED IN ACCORDANCE WITH
 NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS; NFPA 204,
 STANDARD FOR SMOKE AND HEAT VENTING; OR NATIONALLY
 RECOGNIZED STANDARDS, ENGINEERING GUIDES, OR
 RECOMMENDED PRACTICES, AS APPROVED BY THE AUTHORITY
 HAVING JURISDICTION.
 THE ENGINEER OF RECORD SHALL CLEARLY IDENTIFY THE
 INTENT OF THE SYSTEM, THE DESIGN METHOD USED, THE
 APPROPRIATENESS OF THE METHOD USED, AND THE REQUIRED
 MEANS OF INSPECTING, TESTING, AND MAINTAINING THE
 SYSTEM.
  
 ACCEPTANCE TESTING SHALL BE PERFORMED BY A SPECIAL
 INSPECTOR IN ACCORDANCE WITH SECTION 9.9.
  
  
 16. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT
 DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL.
  
  
 17. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING
 PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH
 THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop L LANDSCAPING
Rev No 7 Status P Date 01-10-2023 Cont ID  
Sent By rcaranci Date 01-10-2023 Time 11:37 Rev Time 0.00
Received By rcaranci Date 01-10-2023 Time 11:37 Sent To  
Notes
2023-01-10 11:37:48FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: TRANSIT VILLAGE Z22040014
 JANUARY 10, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 1. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE
 TREES AND PALMS IN GOOD CONDITION TO BE PRESERVED ON
 SITE OR RELOCATED. ANSI A 300 (PART 5) STANDARDS
 SPECIFY EXAMPLES OF SUITABILITY RATINGS OF GOOD,
 MODERATE, OR POOR FOR RELOCATION. PROVIDE AN ARBORISTS
 REPORT RATING THE CONDITION AND RELOCATION POTENTIAL
 FOR THE NATIVE TREES AND PALMS. THE TREE DISPOSITION
 MUST INDICATE WHETHER THE TREE WILL BE PRESERVED,
 RELOCATED OR REMOVED.
 PROVIDE CLEAR TREE MITIGATION PLAN SHEETS L100, L101,
 L412, AND L403, WITHOUT THE PROPOSED BUILDING SHOWN.
 THIS SHOULD BE AN OVERLAY OF THE CURRENT SURVEY
 RESEMBLING SHEET L003 CLEARLY SHOWING LOCATIONS AND
 DISPOSITION OF EXISTING TREES TO BE VERIFIED.
 8/17/22 L100 NEEDS TO HAVE THE BACKGROUND LAYERS
 REMOVED TO MAKE THE TREE LOCATIONS AND LABELS EASILY
 LOCATED AND IDENTIFIED ON THE PLAN.
 LOCATIONS OF RELOCATED TREES AND PALMS TO FULFILL THE
 STREET TREE REQUIREMENT NEEDS TO BE BACKED UP WITH
 SPECIFIC TREES INDICATED THAT WILL MEET THE QUALITY,
 SIZE AND CLEARANCE REQUIREMENTS.
 9/1/22 PROVIDE AN ARBORISTS REPORT RATING THE CONDITION
 AND RELOCATION POTENTIAL FOR THE NATIVE TREES AND PALMS
 THAT ARE SHOWN TO BE REMOVED ON THE DISPOSITION CHART
 AND PLAN. THE RESUBMITTAL NOW INDICATES A NUMBER OF
 NATIVE TREES PROPOSED TO BE REMOVED.
 11/29/22 PROVIDE AN ARBORISTS REPORT RATING THE
 CONDITION AND RELOCATION POTENTIAL FOR THE NATIVE TREES
 AND PALMS THAT ARE SHOWN TO BE REMOVED ON THE
 DISPOSITION CHART AND PLAN.
  
  
 2. SATISFIED. PROVIDE THE INDIVIDUAL AND TOTAL CANOPY
 MITIGATION DUE FOR ANY PROPOSED REMOVALS. TREES
 PROPOSED TO BE REMOVED WITH A CANOPY DIAMETER OF 20
 FEET OR MORE SHOULD HAVE THE MITIGATION SQUARE FOOTAGE
 CALCULATED BASED ON THE ACTUAL DIAMETER. TREES LESS
 THAN 20 FEET CANOPY DIAMETER AND PALMS SHOULD SHOW THE
 CATEGORY MITIGATION DUE.
 CHART HAS CHANGED, SO STATUS OF COMMENT CHANGED.
 THE FOLLOWING CORRECTIONS NEED TO BE MADE ON SHEET
 L601:
 ??? ILEX CASSINE IS A CATEGORY 2 TREE WITH 150 SQ FT OF
 MITIGATION DUE. CORRECT ON CHART FOR #006, 097, 098,
 190, AND 191.
 ??? CORRECT #125 TO SHOW ABOVE 20???
 ??? CORRECT #108 TO 300 SQ FT MITIGATION DUE FOR LIVE
 OAK CATEGORY 1.
  
 3. SATISFIED. PROVIDE A DIAGRAM OF THE REQUIRED AND
 PROVIDED PUBLIC AND PRIVATE OPEN SPACE AREAS FOR THE
 ZONING DISTRICT. IDENTIFY THE TYPE OF OPEN SPACE AS
 ALLOWED BY TABLE IV-7 AND DEFINITIONS IN SECTION
 94-109. SHOW HOW THE STANDARDS FOR THE TYPES OF OPEN
 SPACE ARE MET FOR VEGETATED AREAS AND TREE CANOPY
 SQUARE FOOTAGE BASED ON TABLE IV-8 ON THE LANDSCAPE
 PLAN. LANDSCAPE PLANS MUST MATCH THE ARCHITECTURAL
 PLANS AND CLEARLY IDENTIFY THE OPEN SPACE TYPE THEN
 DEMONSTRATE HOW THE REQUIREMENTS OF THAT TYPE ARE MET.
 TERRACE IS IDENTIFIED AS THE PRIVATE OPEN SPACE TYPE ON
 SHEET L002, BUT OTHER LABELS LIKE PLAZA FOR LEVEL 2 AND
 ROOFTOP PLAZA FOR LEVEL 4 APPEAR ON THE OTHER SHEETS.
 LEVEL 9 IS LABELED AS TERRACE BUT HAS THE
 CHARACTERISTICS OF ROOFTOP GARDEN.
 IN SUMMARY, THE REQUIRED OPEN SPACE NEEDS TO BE
 QUANTIFIED, IDENTIFIED AS TO THE TYPE, AND ALL
 REQUIREMENTS NEED TO BE SHOWN FOR THAT OPEN SPACE TYPE.
  
 PER SHEET L005.
 OPEN SPACE 1A, 1B, AND 1C. COURTYARD IS NOT AN ALLOWED
 PUBLIC OPEN SPACE TYPE IN TOD, SO IT IS NOT POSSIBLE TO
 VERIFY THE VEGETATED AND TREE CANOPY REQUIREMENTS.
 8/17/22 GARDEN COURTYARD IS SPECIFIED.
 9/1/22 SHOW THE PERIMETER OF EACH AREA SPECIFIED.
 PROVIDE THE TREE SPECIES ON THE TREE CANOPY CHART SO
 STAFF CAN VERIFY THE CREDITS. HIGHLIGHT THE VEGETATED
 AREA THAT IS PROVIDED WITHIN EACH OPEN SPACE BOUNDARY.
 1B REQUIRED VEGETATED AREA AND TREE CANOPY SHOULD BE
 THE SAME SQUARE FOOTAGE ON THE CHART. OVERALL LANDSCAPE
 REQUIREMENT CHART IS NOT NEEDED, EACH OPEN SPACE CHART
 MUST SHOW HOW REQUIREMENTS FOR THAT SPACE ARE MET FOR
 VEGETATED AREA AND TREE CANOPY.
  
 OPEN SPACE 2A. INTERIOR COURTYARD IS NOT AN ALLOWED
 PRIVATE OPEN SPACE TYPE IN TOD, SO IT IS NOT POSSIBLE
 TO VERIFY THE VEGETATED AND TREE CANOPY REQUIREMENTS.
 8/17/22 RENAMED GARDEN PLAZA, BUT CANNOT BE CLASSIFIED
 AS THIS UNLESS IT MEETS THE REQUIREMENTS INCLUDING
 BEING ON GROUND LEVEL.
 9/1/22 THESE AREAS ARE NOW SHOWN AS ADDITIONAL ON SHEET
 L008 AND NOT COUNTED TOWARD OPEN SPACE REQUIREMENTS,
 BUT IF NOT ON GROUND LEVEL CANNOT BE CALLED GARDEN
 PLAZA.
  
  
  
 OPEN SPACE 4A AND 4B, TERRACE IS AN ALLOWED PRIVATE
 OPEN SPACE TYPE, BUT THE REQUIREMENTS SHOWN ARE NOT
 CONSISTENT WITH TERRACE REQUIREMENTS.
 TERRACE REQUIRES 20% VEGETATED AREA AND MUST ABUT A
 RIGHT OF WAY ON AT LEAST ONE SIDE.
 8/17/22 CORRECTED ON SHEET L005. SHEET L002 IS
 INCOMPLETE.
 9/1/22 NOW SHOWN ON SHEET L006. SHOW THE PERIMETER OF
 EACH AREA SPECIFIED. PROVIDE THE TREE SPECIES ON THE
 TREE CANOPY CHART SO STAFF CAN VERIFY THE CREDITS.
 HIGHLIGHT THE VEGETATED AREA THAT IS PROVIDED WITHIN
 EACH OPEN SPACE BOUNDARY. OVERALL LANDSCAPE REQUIREMENT
 CHART IS NOT NEEDED, EACH OPEN SPACE CHART MUST SHOW
 HOW REQUIREMENTS FOR THAT SPACE ARE MET FOR VEGETATED
 AREA AND TREE CANOPY.
  
 OPEN SPACE 9A AND 9B. SHOULD BE ROOFTOP GARDEN AS
 REQUIRED BY TOD. THE VEGETATED AND TREE CANOPY
 REQUIREMENTS ARE 50% EACH FOR TOD.
 8/17/22 NOT CORRECTED.
 9/1/22 SHOW THE PERIMETER OF EACH AREA SPECIFIED.
 PROVIDE THE TREE SPECIES ON THE TREE CANOPY CHART SO
 STAFF CAN VERIFY THE CREDITS. HIGHLIGHT THE VEGETATED
 AREA THAT IS PROVIDED WITHIN EACH OPEN SPACE BOUNDARY.
 OVERALL LANDSCAPE REQUIREMENT CHART IS NOT NEEDED, EACH
 OPEN SPACE CHART MUST SHOW HOW REQUIREMENTS FOR THAT
 SPACE ARE MET FOR VEGETATED AREA AND TREE CANOPY. 9A
 DOES NOT MEET THE VEGETATED AREA REQUIRED.
  
 ALL SHEETS MUST BE CONSISTENT WITH LABELING OF OPEN
 SPACES.
 SHEET L002 DOES NOT MATCH L005.
 8/17/22 SHEET L002 SHOWS THE INDIVIDUAL AREAS, SHEET
 L005 CHART MUST SHOW THE BREAKDOWN FOR EACH AREA FOR
 THE VEGETATED AREA LOCATIONS, TREE CANOPY, ETC. AS
 SHOWN ON L002.
 9/1/22 SHEET NUMBERS HAVE BEEN REVISED.
  
  
 4. SATISFIED. ALL OPEN SPACE TYPES REQUIRING TREE
 CANOPY MUST SHOW THE TREE CANOPY SQUARE FOOTAGE FOR
 TREE TYPES BASED ON TABLE IV-8 AND PROVIDE THE TOTAL.
  
 TREE CANOPY CALCULATIONS ARE NOT CORRECT, MUST BE
 CALCULATED PER TABLE IV-8 WHICH WOULD BE ROUND NUMBERS.
 8/17/22 TREES MUST BE SHOWN THAT ARE BEING USED FOR
 CREDIT FOR OPEN SPACE TREE CANOPY REQUIREMENT AND THE
 CREDITS ASSIGNED SHOWN WITH TOTAL. THIS IS BEST
 ACCOMPLISHED WITH A PLANT LIST AND AREA SHOWN FOR EACH
 OPEN SPACE.
 9/1/22 AS NOTED IN THE PREVIOUS COMMENTS, PROVIDE THE
 TREE SPECIES ON THE TREE CANOPY CHART SO STAFF CAN
 VERIFY THE CREDITS.
  
 5. SATISFIED. IDENTIFY RELOCATED TREES OR PALMS ON THE
 PLANT LIST AND COUNT THEM TOWARD THE REQUIRED TREES IF
 THEY ARE TO BE USED ON SITE.
 NEED FURTHER DETAIL PROVIDED ON THE PLANS.
 8/17/22 RELOCATED TREES AND PALMS WERE NOT FOUND ON THE
 SHEETS REFERENCED.
 IDENTIFY THE LOCATIONS FOR THE TREES AND PALMS TO BE
 RELOCATED. THE ROYAL PALMS ARE THE ONLY RELOCATES
 MARKED AS GOING TO OTHER COUNTY PROPERTY ON THE
 DISPOSITION LIST.
  
  
  
 6. SATISFIED. PROVIDE INFORMATION ON THE REDUCTION OF
 THE GREEN SCREEN AREA FROM WHAT WAS APPROVED BY
 COMPARISON OF THE SQUARE FOOTAGE FROM THE ORIGINAL
 APPROVAL AND WHAT IS PROPOSED. PROVIDE DETAILS ON THE
 STRUCTURE AND THE PLANT MATERIAL.
  
 7. SATISFIED. THE AREA WITHIN THE BUS LOOP IS PROPOSED
 TO HAVE MOSAIC TILE RATHER THAN THE PLANTINGS
 ORIGINALLY APPROVED. DESCRIBE HOW THE ENVIRONMENT WILL
 BE IMPROVED WITHIN THE BUS LOOP.
  
 8. SATISFIED. LANDSCAPE SHEETS ARE IN TOO SMALL A SCALE
 TO CLEARLY IDENTIFY ALL PLANT MATERIAL. NEED TO BE
 SHOWN ON SEPARATE SHEETS AT A LARGER SCALE.
  
 1:20 SCALE WILL BE NEEDED TO CLEARLY SEE ALL DETAIL.
 NEED FURTHER DETAIL PROVIDED ON THE PLANS.
 8/17/22 THE SCALE IS STILL TOO SMALL TO SUFFICIENTLY
 REVIEW THE PLANS. THE COLOR EASEMENTS NEED TO BE
 REMOVED FROM THE PLANS. INDIVIDUAL SHEETS OF THE
 SEPARATE OPEN SPACE AREAS NEED TO BE CLEARLY DELINEATED
 AND UNNECESSARY INFORMATION REMOVED.
  
  
 9. SATISFIED. ARTIFICIAL TURF AREAS PROPOSED MUST MEET
 THE REQUIREMENTS OF SECTION 94-451, INCLUDING ALL AREAS
 THAT ARE ALLOWED BY CODE MUST NOT BE VISIBLE FROM A
 ROAD OR STREET.
  
  
 10. SATISFIED. PROVIDE CALCULATIONS FOR REQUIRED STREET
 TREES AT MAXIMUM SPACING EVERY 30 FEET OR PORTION
 THEREOF FOR EACH STREETSCAPE LENGTH, AND SHOW THE
 NUMBER PROVIDED PER SECTION 94-113 AND 94-116. THE
 BANYAN STREETSCAPE IMPROVEMENTS NEED TO BE INCLUDED ON
 THE PLANS TO SHOW THE INTEGRATION OF THIS PROJECT WITH
 THE STREETSCAPE.
 THE BANYAN STREETSCAPE MUST BE SHOWN AS APPROVED.
 THERE ARE LARGE GAPS IN THE STREET TREE PLACEMENT ALONG
 CLEARWATER DRIVE THAT DO NOT HAVE TREE CANOPY PROVIDED
 FOR PEDESTRIANS ON THE SIDEWALK. 30 FOOT MAXIMUM
 SPACING MUST BE FOLLOWED, AND STREETSCAPE IS REQUIRED
 ADJACENT TO PUBLIC OPEN SPACES AND DROP OFFS.
 8/17/22 THERE IS A LARGE GAP WITH NO STREET TREES
 ADJACENT TO OPEN SPACE 1A. THERE IS A DROP OFF AREA
 ALONG CLEARWATER DRIVE THAT DOES NOT SHOW THE REQUIRED
 STREET TREES.
 BANYAN STREETSCAPE SHOWN IS NOT ACCURATE AND SHOWS
 PROPOSED CHANGES THAT STAFF DOES NOT SUPPORT.
 9/1/22 THERE IS A GAP WITH NO STREET TREES NORTH OF THE
 SECOND DRIVEWAY FROM BANYAN.
 THERE IS A DROP OFF AREA ALONG CLEARWATER DRIVE THAT
 DOES NOT SHOW THE REQUIRED STREET TREES AT THE 30 FOOT
 MAXIMUM SPACING.
 BANYAN STREETSCAPE SHOWN IS NOT ACCURATE AND SHOWS
 PROPOSED CHANGES THAT STAFF DOES NOT SUPPORT.
 THE STREET TREES ALONG THE RESIDENTIAL LOBBY ARE NOT
 LOCATED ADJACENT TO THE CURB IN THE 4 FOOT PLANTING
 STRIP AS REQUIRED. THERE IS ALSO A GAP IN THE STREET
 TREES ON THE NORTH SIDE OF THE THIRD DRIVEWAY.
 STRUCTURAL SOIL LOCATIONS MUST BE IDENTIFIED AND
 TYPICAL INSTALLATION DETAIL ADDED TO MEET THE CODE
 REQUIREMENT IN SECTION 94-113.
  
 11/29/22 THERE IS A GAP WITH NO STREET TREES NORTH OF
 THE SECOND DRIVEWAY FROM BANYAN.
 THERE IS A DROP OFF AREA ALONG CLEARWATER DRIVE THAT
 DOES NOT SHOW THE REQUIRED STREET TREES AT THE 30 FOOT
 MAXIMUM SPACING.
 SATISFIED. BANYAN STREETSCAPE SHOWN IS NOT ACCURATE AND
 SHOWS PROPOSED CHANGES THAT STAFF DOES NOT SUPPORT.
 THE STREET TREES ALONG THE RESIDENTIAL LOBBY ARE NOT
 LOCATED ADJACENT TO THE CURB IN THE 4 FOOT PLANTING
 STRIP AS REQUIRED. THERE IS ALSO A GAP IN THE STREET
 TREES ON THE NORTH SIDE OF THE THIRD DRIVEWAY.
 STRUCTURAL SOIL LOCATIONS MUST BE IDENTIFIED AND
 TYPICAL INSTALLATION DETAIL ADDED TO MEET THE CODE
 REQUIREMENT IN SECTION 94-113. DETAIL IS NOT CORRECT.
  
  
 12/22/22 THE SILVER BUTTONWOOD TREES DO NOT MEET THE
 REQUIREMENTS AS STREET TREES TO PROVIDE SHADE. CHANGE
 TO SHADE TREES.
 THE REQUIRED SIDEWALK WIDTH IS 8 FEET NOT 5 FEET PER
 94-113(D)(1) AND MUST BE LOCATED ALONG THE BUILDING
 FRONTAGE. THE STREET TREES MAY BE ABLE TO BE LOCATED
 CLOSER TO THE EASEMENT WITH THE SIDEWALK PROVIDED
 ADJACENT TO THE CURB MEETING THE REQUIREMENT. INDICATE
 THE SIDEWALK LOCATION AND PROVIDE THE DIMENSION.
  
  
  
 11. SATISFIED. EXPLAIN IF THE EXISTING FPL TRANSMISSION
 LINES WILL STAY IN PLACE OR BE RELOCATED.
  
 12. SATISFIED. SHOW ALL EXISTING AND PROPOSED WATER AND
 SEWER AND DRAINAGE LINES ON THE LANDSCAPE PLAN. SHOW
 LOCATIONS OF BACKFLOWS AND ADJUST LOCATIONS OF UTILITY
 LINES TO RESOLVE CONFLICTS WITH EXISTING AND PROPOSED
 TREES AND LANDSCAPING.
 WATERLINE EASEMENT SHOWN, BUT OTHER FIRE LINES, WATER
 AND SEWER SERVICE WERE NOT FOUND. NEED FURTHER DETAIL
 PROVIDED ON THE PLANS.
 8/17/22 DETAIL STILL NOT EVIDENT ON THE LANDSCAPE
 PLANS.
 9/1/22 THE LANDSCAPE PLANS DO NOT SHOW THE WATER, SEWER
 AND FIRE LINES TO ASSURE THERE ARE NO CONFLICTS WITH
 REQUIRED LANDSCAPING AND PROVIDE FINAL LOCATIONS FOR
 SCREENING.
  
 11/29/22 THE LANDSCAPE PLANS DO NOT SHOW THE WATER,
 SEWER AND FIRE LINES TO ASSURE THERE ARE NO CONFLICTS
 WITH REQUIRED LANDSCAPING AND PROVIDE FINAL LOCATIONS
 FOR SCREENING.
  
  
 13. SATISFIED. PLANT LIST NEEDS TO BE MODIFIED TO
 INCLUDE ALL PLANT MATERIAL FOR THE PROJECT,
 AND SEPARATE PLANT LIST FOR EACH OPEN SPACE AREA
 PROVIDED FOR REFERENCE TO SHOW COMPLIANCE WITH THE OPEN
 SPACE TYPE REQUIREMENTS.
 COULD NOT LOCATE A COMPLETE PLANT LIST.
 8/17/22 PLANT LIST NOT FOUND ON L004 AS INDICATED IN
 THE RESPONSE MEMO.
  
 11/29/22 PROVIDE A COMPLETE PLANT LIST FOR THE PROJECT
 ON ONE SHEET. SHEET L603 IS NOT A COMPLETE PLANT LIST.
  
  
  
 14. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L.
 PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT
 MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT
 TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE
 LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH
 FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH
 FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED
 ON THE PLANT LIST.
 SHOW THE PERCENTAGE BASED ON THE FINAL PLANT LIST.
 8/17/22 DETAIL STILL NOT INCLUDED ON THE LANDSCAPE
 PLANS.
 9/1/22 PROVIDE THE ACTUAL PERCENTAGE BASED ON THE
 COMPLETE PLANT LIST ON ONE SHEET.
 11/29/22 PROVIDE THE ACTUAL PERCENTAGE BASED ON THE
 COMPLETE PLANT LIST ON ONE SHEET. SHEET L603 IS NOT A
 COMPLETE PLANT LIST.
  
  
 15. SATISFIED. PROVIDE SCREENING HEDGES FOR ALL GROUND
 MOUNTED VALVES AND EQUIPMENT AND ADD A NOTE THAT ALL
 EQUIPMENT WILL BE SCREENED.
 NEED FURTHER DETAIL PROVIDED ON THE PLANS.
 8/17/22 DETAIL STILL NOT INCLUDED ON THE LANDSCAPE
 PLANS.
  
 ADDITIONAL COMMENTS 7/8/22:
  
 16. SATISFIED. PROVIDE THE TOTAL TREE CANOPY MITIGATION
 PROVIDED FROM THE ADDED TREES ON THE PLANT LIST.
 9/1/22 RESPONSES INDICATE THIS INFORMATION WAS PROVIDED
 ON SHEET L112,
 BUT WAS NOT FOUND.
  
 17. SATISFIED. THE PALM SUBSTITUTION INFORMATION
 PROVIDED IN THE LANDSCAPE CALCULATIONS CHART ON SHEET
 L002 IS NOT CONSISTENT WITH CURRENT CODE REQUIREMENTS.
 REVISE.
  
 ADDITIONAL COMMENTS 9/1/22:
 18. CONDITIONALLY SATISFIED. LOCATIONS IN REQUIRED
 PUBLIC OPEN SPACES FOR POSSIBLE AIPP ON SHEET L008 AND
 L010 DO NOT SHOW DETAIL OF HOW THE REQUIRED LANDSCAPING
 WOULD BE AFFECTED.
 11/29/22: THE NOTE PLACED ON SHEET L008 DOES NOT
 ADDRESS THE COMMENT. REQUIRED LANDSCAPING SHOULD NOT BE
 AFFECTED BY ART PLACEMENT.
  
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE STREET TREES AND
 RIGHT OF WAY LANDSCAPING AND IRRIGATION. THIS WILL BE
 THROUGH A SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  
 4. FINAL LOCATIONS FOR PUBLIC ART WILL REQUIRE AN
 AMENDMENT TO THE SITE PLAN TO VERIFY ALL LANDSCAPE
 REQUIREMENTS ARE MET.
  
 5. AT TIME OF BUILDING PERMIT SUBMITTAL, ENGINEERING
 AND LANDSCAPE PLANS SHALL BE REVISED TO ACCURATELY SHOW
 THE LOCATIONS OF REQUIRED STRUCTURAL SOIL.
  

Review Stop L LANDSCAPING
Rev No 6 Status F Date 12-22-2022 Cont ID  
Sent By rcaranci Date 12-22-2022 Time 14:04 Rev Time 0.00
Received By rcaranci Date 12-22-2022 Time 14:04 Sent To  
Notes
2022-12-22 14:05:28FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: TRANSIT VILLAGE Z22040014
 DECEMBER 22, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 1. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE
 TREES AND PALMS IN GOOD CONDITION TO BE PRESERVED ON
 SITE OR RELOCATED. ANSI A 300 (PART 5) STANDARDS
 SPECIFY EXAMPLES OF SUITABILITY RATINGS OF GOOD,
 MODERATE, OR POOR FOR RELOCATION. PROVIDE AN ARBORISTS
 REPORT RATING THE CONDITION AND RELOCATION POTENTIAL
 FOR THE NATIVE TREES AND PALMS. THE TREE DISPOSITION
 MUST INDICATE WHETHER THE TREE WILL BE PRESERVED,
 RELOCATED OR REMOVED.
 PROVIDE CLEAR TREE MITIGATION PLAN SHEETS L100, L101,
 L412, AND L403, WITHOUT THE PROPOSED BUILDING SHOWN.
 THIS SHOULD BE AN OVERLAY OF THE CURRENT SURVEY
 RESEMBLING SHEET L003 CLEARLY SHOWING LOCATIONS AND
 DISPOSITION OF EXISTING TREES TO BE VERIFIED.
 8/17/22 L100 NEEDS TO HAVE THE BACKGROUND LAYERS
 REMOVED TO MAKE THE TREE LOCATIONS AND LABELS EASILY
 LOCATED AND IDENTIFIED ON THE PLAN.
 LOCATIONS OF RELOCATED TREES AND PALMS TO FULFILL THE
 STREET TREE REQUIREMENT NEEDS TO BE BACKED UP WITH
 SPECIFIC TREES INDICATED THAT WILL MEET THE QUALITY,
 SIZE AND CLEARANCE REQUIREMENTS.
 9/1/22 PROVIDE AN ARBORISTS REPORT RATING THE CONDITION
 AND RELOCATION POTENTIAL FOR THE NATIVE TREES AND PALMS
 THAT ARE SHOWN TO BE REMOVED ON THE DISPOSITION CHART
 AND PLAN. THE RESUBMITTAL NOW INDICATES A NUMBER OF
 NATIVE TREES PROPOSED TO BE REMOVED.
 11/29/22 PROVIDE AN ARBORISTS REPORT RATING THE
 CONDITION AND RELOCATION POTENTIAL FOR THE NATIVE TREES
 AND PALMS THAT ARE SHOWN TO BE REMOVED ON THE
 DISPOSITION CHART AND PLAN.
  
  
 2. SATISFIED. PROVIDE THE INDIVIDUAL AND TOTAL CANOPY
 MITIGATION DUE FOR ANY PROPOSED REMOVALS. TREES
 PROPOSED TO BE REMOVED WITH A CANOPY DIAMETER OF 20
 FEET OR MORE SHOULD HAVE THE MITIGATION SQUARE FOOTAGE
 CALCULATED BASED ON THE ACTUAL DIAMETER. TREES LESS
 THAN 20 FEET CANOPY DIAMETER AND PALMS SHOULD SHOW THE
 CATEGORY MITIGATION DUE.
 CHART HAS CHANGED, SO STATUS OF COMMENT CHANGED.
 THE FOLLOWING CORRECTIONS NEED TO BE MADE ON SHEET
 L601:
 ??? ILEX CASSINE IS A CATEGORY 2 TREE WITH 150 SQ FT OF
 MITIGATION DUE. CORRECT ON CHART FOR #006, 097, 098,
 190, AND 191.
 ??? CORRECT #125 TO SHOW ABOVE 20???
 ??? CORRECT #108 TO 300 SQ FT MITIGATION DUE FOR LIVE
 OAK CATEGORY 1.
  
 3. SATISFIED. PROVIDE A DIAGRAM OF THE REQUIRED AND
 PROVIDED PUBLIC AND PRIVATE OPEN SPACE AREAS FOR THE
 ZONING DISTRICT. IDENTIFY THE TYPE OF OPEN SPACE AS
 ALLOWED BY TABLE IV-7 AND DEFINITIONS IN SECTION
 94-109. SHOW HOW THE STANDARDS FOR THE TYPES OF OPEN
 SPACE ARE MET FOR VEGETATED AREAS AND TREE CANOPY
 SQUARE FOOTAGE BASED ON TABLE IV-8 ON THE LANDSCAPE
 PLAN. LANDSCAPE PLANS MUST MATCH THE ARCHITECTURAL
 PLANS AND CLEARLY IDENTIFY THE OPEN SPACE TYPE THEN
 DEMONSTRATE HOW THE REQUIREMENTS OF THAT TYPE ARE MET.
 TERRACE IS IDENTIFIED AS THE PRIVATE OPEN SPACE TYPE ON
 SHEET L002, BUT OTHER LABELS LIKE PLAZA FOR LEVEL 2 AND
 ROOFTOP PLAZA FOR LEVEL 4 APPEAR ON THE OTHER SHEETS.
 LEVEL 9 IS LABELED AS TERRACE BUT HAS THE
 CHARACTERISTICS OF ROOFTOP GARDEN.
 IN SUMMARY, THE REQUIRED OPEN SPACE NEEDS TO BE
 QUANTIFIED, IDENTIFIED AS TO THE TYPE, AND ALL
 REQUIREMENTS NEED TO BE SHOWN FOR THAT OPEN SPACE TYPE.
  
 PER SHEET L005.
 OPEN SPACE 1A, 1B, AND 1C. COURTYARD IS NOT AN ALLOWED
 PUBLIC OPEN SPACE TYPE IN TOD, SO IT IS NOT POSSIBLE TO
 VERIFY THE VEGETATED AND TREE CANOPY REQUIREMENTS.
 8/17/22 GARDEN COURTYARD IS SPECIFIED.
 9/1/22 SHOW THE PERIMETER OF EACH AREA SPECIFIED.
 PROVIDE THE TREE SPECIES ON THE TREE CANOPY CHART SO
 STAFF CAN VERIFY THE CREDITS. HIGHLIGHT THE VEGETATED
 AREA THAT IS PROVIDED WITHIN EACH OPEN SPACE BOUNDARY.
 1B REQUIRED VEGETATED AREA AND TREE CANOPY SHOULD BE
 THE SAME SQUARE FOOTAGE ON THE CHART. OVERALL LANDSCAPE
 REQUIREMENT CHART IS NOT NEEDED, EACH OPEN SPACE CHART
 MUST SHOW HOW REQUIREMENTS FOR THAT SPACE ARE MET FOR
 VEGETATED AREA AND TREE CANOPY.
  
 OPEN SPACE 2A. INTERIOR COURTYARD IS NOT AN ALLOWED
 PRIVATE OPEN SPACE TYPE IN TOD, SO IT IS NOT POSSIBLE
 TO VERIFY THE VEGETATED AND TREE CANOPY REQUIREMENTS.
 8/17/22 RENAMED GARDEN PLAZA, BUT CANNOT BE CLASSIFIED
 AS THIS UNLESS IT MEETS THE REQUIREMENTS INCLUDING
 BEING ON GROUND LEVEL.
 9/1/22 THESE AREAS ARE NOW SHOWN AS ADDITIONAL ON SHEET
 L008 AND NOT COUNTED TOWARD OPEN SPACE REQUIREMENTS,
 BUT IF NOT ON GROUND LEVEL CANNOT BE CALLED GARDEN
 PLAZA.
  
  
  
 OPEN SPACE 4A AND 4B, TERRACE IS AN ALLOWED PRIVATE
 OPEN SPACE TYPE, BUT THE REQUIREMENTS SHOWN ARE NOT
 CONSISTENT WITH TERRACE REQUIREMENTS.
 TERRACE REQUIRES 20% VEGETATED AREA AND MUST ABUT A
 RIGHT OF WAY ON AT LEAST ONE SIDE.
 8/17/22 CORRECTED ON SHEET L005. SHEET L002 IS
 INCOMPLETE.
 9/1/22 NOW SHOWN ON SHEET L006. SHOW THE PERIMETER OF
 EACH AREA SPECIFIED. PROVIDE THE TREE SPECIES ON THE
 TREE CANOPY CHART SO STAFF CAN VERIFY THE CREDITS.
 HIGHLIGHT THE VEGETATED AREA THAT IS PROVIDED WITHIN
 EACH OPEN SPACE BOUNDARY. OVERALL LANDSCAPE REQUIREMENT
 CHART IS NOT NEEDED, EACH OPEN SPACE CHART MUST SHOW
 HOW REQUIREMENTS FOR THAT SPACE ARE MET FOR VEGETATED
 AREA AND TREE CANOPY.
  
 OPEN SPACE 9A AND 9B. SHOULD BE ROOFTOP GARDEN AS
 REQUIRED BY TOD. THE VEGETATED AND TREE CANOPY
 REQUIREMENTS ARE 50% EACH FOR TOD.
 8/17/22 NOT CORRECTED.
 9/1/22 SHOW THE PERIMETER OF EACH AREA SPECIFIED.
 PROVIDE THE TREE SPECIES ON THE TREE CANOPY CHART SO
 STAFF CAN VERIFY THE CREDITS. HIGHLIGHT THE VEGETATED
 AREA THAT IS PROVIDED WITHIN EACH OPEN SPACE BOUNDARY.
 OVERALL LANDSCAPE REQUIREMENT CHART IS NOT NEEDED, EACH
 OPEN SPACE CHART MUST SHOW HOW REQUIREMENTS FOR THAT
 SPACE ARE MET FOR VEGETATED AREA AND TREE CANOPY. 9A
 DOES NOT MEET THE VEGETATED AREA REQUIRED.
  
 ALL SHEETS MUST BE CONSISTENT WITH LABELING OF OPEN
 SPACES.
 SHEET L002 DOES NOT MATCH L005.
 8/17/22 SHEET L002 SHOWS THE INDIVIDUAL AREAS, SHEET
 L005 CHART MUST SHOW THE BREAKDOWN FOR EACH AREA FOR
 THE VEGETATED AREA LOCATIONS, TREE CANOPY, ETC. AS
 SHOWN ON L002.
 9/1/22 SHEET NUMBERS HAVE BEEN REVISED.
  
  
 4. SATISFIED. ALL OPEN SPACE TYPES REQUIRING TREE
 CANOPY MUST SHOW THE TREE CANOPY SQUARE FOOTAGE FOR
 TREE TYPES BASED ON TABLE IV-8 AND PROVIDE THE TOTAL.
  
 TREE CANOPY CALCULATIONS ARE NOT CORRECT, MUST BE
 CALCULATED PER TABLE IV-8 WHICH WOULD BE ROUND NUMBERS.
 8/17/22 TREES MUST BE SHOWN THAT ARE BEING USED FOR
 CREDIT FOR OPEN SPACE TREE CANOPY REQUIREMENT AND THE
 CREDITS ASSIGNED SHOWN WITH TOTAL. THIS IS BEST
 ACCOMPLISHED WITH A PLANT LIST AND AREA SHOWN FOR EACH
 OPEN SPACE.
 9/1/22 AS NOTED IN THE PREVIOUS COMMENTS, PROVIDE THE
 TREE SPECIES ON THE TREE CANOPY CHART SO STAFF CAN
 VERIFY THE CREDITS.
  
 5. SATISFIED. IDENTIFY RELOCATED TREES OR PALMS ON THE
 PLANT LIST AND COUNT THEM TOWARD THE REQUIRED TREES IF
 THEY ARE TO BE USED ON SITE.
 NEED FURTHER DETAIL PROVIDED ON THE PLANS.
 8/17/22 RELOCATED TREES AND PALMS WERE NOT FOUND ON THE
 SHEETS REFERENCED.
 IDENTIFY THE LOCATIONS FOR THE TREES AND PALMS TO BE
 RELOCATED. THE ROYAL PALMS ARE THE ONLY RELOCATES
 MARKED AS GOING TO OTHER COUNTY PROPERTY ON THE
 DISPOSITION LIST.
  
  
  
 6. SATISFIED. PROVIDE INFORMATION ON THE REDUCTION OF
 THE GREEN SCREEN AREA FROM WHAT WAS APPROVED BY
 COMPARISON OF THE SQUARE FOOTAGE FROM THE ORIGINAL
 APPROVAL AND WHAT IS PROPOSED. PROVIDE DETAILS ON THE
 STRUCTURE AND THE PLANT MATERIAL.
  
 7. SATISFIED. THE AREA WITHIN THE BUS LOOP IS PROPOSED
 TO HAVE MOSAIC TILE RATHER THAN THE PLANTINGS
 ORIGINALLY APPROVED. DESCRIBE HOW THE ENVIRONMENT WILL
 BE IMPROVED WITHIN THE BUS LOOP.
  
 8. SATISFIED. LANDSCAPE SHEETS ARE IN TOO SMALL A SCALE
 TO CLEARLY IDENTIFY ALL PLANT MATERIAL. NEED TO BE
 SHOWN ON SEPARATE SHEETS AT A LARGER SCALE.
  
 1:20 SCALE WILL BE NEEDED TO CLEARLY SEE ALL DETAIL.
 NEED FURTHER DETAIL PROVIDED ON THE PLANS.
 8/17/22 THE SCALE IS STILL TOO SMALL TO SUFFICIENTLY
 REVIEW THE PLANS. THE COLOR EASEMENTS NEED TO BE
 REMOVED FROM THE PLANS. INDIVIDUAL SHEETS OF THE
 SEPARATE OPEN SPACE AREAS NEED TO BE CLEARLY DELINEATED
 AND UNNECESSARY INFORMATION REMOVED.
  
  
 9. SATISFIED. ARTIFICIAL TURF AREAS PROPOSED MUST MEET
 THE REQUIREMENTS OF SECTION 94-451, INCLUDING ALL AREAS
 THAT ARE ALLOWED BY CODE MUST NOT BE VISIBLE FROM A
 ROAD OR STREET.
  
  
 10. PARTIALLY SATISFIED. PROVIDE CALCULATIONS FOR
 REQUIRED STREET TREES AT MAXIMUM SPACING EVERY 30 FEET
 OR PORTION THEREOF FOR EACH STREETSCAPE LENGTH, AND
 SHOW THE NUMBER PROVIDED PER SECTION 94-113 AND 94-116.
 THE BANYAN STREETSCAPE IMPROVEMENTS NEED TO BE INCLUDED
 ON THE PLANS TO SHOW THE INTEGRATION OF THIS PROJECT
 WITH THE STREETSCAPE.
 THE BANYAN STREETSCAPE MUST BE SHOWN AS APPROVED.
 THERE ARE LARGE GAPS IN THE STREET TREE PLACEMENT ALONG
 CLEARWATER DRIVE THAT DO NOT HAVE TREE CANOPY PROVIDED
 FOR PEDESTRIANS ON THE SIDEWALK. 30 FOOT MAXIMUM
 SPACING MUST BE FOLLOWED, AND STREETSCAPE IS REQUIRED
 ADJACENT TO PUBLIC OPEN SPACES AND DROP OFFS.
 8/17/22 THERE IS A LARGE GAP WITH NO STREET TREES
 ADJACENT TO OPEN SPACE 1A. THERE IS A DROP OFF AREA
 ALONG CLEARWATER DRIVE THAT DOES NOT SHOW THE REQUIRED
 STREET TREES.
 BANYAN STREETSCAPE SHOWN IS NOT ACCURATE AND SHOWS
 PROPOSED CHANGES THAT STAFF DOES NOT SUPPORT.
 9/1/22 THERE IS A GAP WITH NO STREET TREES NORTH OF THE
 SECOND DRIVEWAY FROM BANYAN.
 THERE IS A DROP OFF AREA ALONG CLEARWATER DRIVE THAT
 DOES NOT SHOW THE REQUIRED STREET TREES AT THE 30 FOOT
 MAXIMUM SPACING.
 BANYAN STREETSCAPE SHOWN IS NOT ACCURATE AND SHOWS
 PROPOSED CHANGES THAT STAFF DOES NOT SUPPORT.
 THE STREET TREES ALONG THE RESIDENTIAL LOBBY ARE NOT
 LOCATED ADJACENT TO THE CURB IN THE 4 FOOT PLANTING
 STRIP AS REQUIRED. THERE IS ALSO A GAP IN THE STREET
 TREES ON THE NORTH SIDE OF THE THIRD DRIVEWAY.
 STRUCTURAL SOIL LOCATIONS MUST BE IDENTIFIED AND
 TYPICAL INSTALLATION DETAIL ADDED TO MEET THE CODE
 REQUIREMENT IN SECTION 94-113.
  
 11/29/22 THERE IS A GAP WITH NO STREET TREES NORTH OF
 THE SECOND DRIVEWAY FROM BANYAN.
 THERE IS A DROP OFF AREA ALONG CLEARWATER DRIVE THAT
 DOES NOT SHOW THE REQUIRED STREET TREES AT THE 30 FOOT
 MAXIMUM SPACING.
 SATISFIED. BANYAN STREETSCAPE SHOWN IS NOT ACCURATE AND
 SHOWS PROPOSED CHANGES THAT STAFF DOES NOT SUPPORT.
 THE STREET TREES ALONG THE RESIDENTIAL LOBBY ARE NOT
 LOCATED ADJACENT TO THE CURB IN THE 4 FOOT PLANTING
 STRIP AS REQUIRED. THERE IS ALSO A GAP IN THE STREET
 TREES ON THE NORTH SIDE OF THE THIRD DRIVEWAY.
 STRUCTURAL SOIL LOCATIONS MUST BE IDENTIFIED AND
 TYPICAL INSTALLATION DETAIL ADDED TO MEET THE CODE
 REQUIREMENT IN SECTION 94-113. DETAIL IS NOT CORRECT.
  
  
 12/22/22 THE SILVER BUTTONWOOD TREES DO NOT MEET THE
 REQUIREMENTS AS STREET TREES TO PROVIDE SHADE. CHANGE
 TO SHADE TREES.
 THE REQUIRED SIDEWALK WIDTH IS 8 FEET NOT 5 FEET PER
 94-113(D)(1) AND MUST BE LOCATED ALONG THE BUILDING
 FRONTAGE. THE STREET TREES MAY BE ABLE TO BE LOCATED
 CLOSER TO THE EASEMENT WITH THE SIDEWALK PROVIDED
 ADJACENT TO THE CURB MEETING THE REQUIREMENT. INDICATE
 THE SIDEWALK LOCATION AND PROVIDE THE DIMENSION.
  
  
  
 11. SATISFIED. EXPLAIN IF THE EXISTING FPL TRANSMISSION
 LINES WILL STAY IN PLACE OR BE RELOCATED.
  
 12. SATISFIED. SHOW ALL EXISTING AND PROPOSED WATER AND
 SEWER AND DRAINAGE LINES ON THE LANDSCAPE PLAN. SHOW
 LOCATIONS OF BACKFLOWS AND ADJUST LOCATIONS OF UTILITY
 LINES TO RESOLVE CONFLICTS WITH EXISTING AND PROPOSED
 TREES AND LANDSCAPING.
 WATERLINE EASEMENT SHOWN, BUT OTHER FIRE LINES, WATER
 AND SEWER SERVICE WERE NOT FOUND. NEED FURTHER DETAIL
 PROVIDED ON THE PLANS.
 8/17/22 DETAIL STILL NOT EVIDENT ON THE LANDSCAPE
 PLANS.
 9/1/22 THE LANDSCAPE PLANS DO NOT SHOW THE WATER, SEWER
 AND FIRE LINES TO ASSURE THERE ARE NO CONFLICTS WITH
 REQUIRED LANDSCAPING AND PROVIDE FINAL LOCATIONS FOR
 SCREENING.
  
 11/29/22 THE LANDSCAPE PLANS DO NOT SHOW THE WATER,
 SEWER AND FIRE LINES TO ASSURE THERE ARE NO CONFLICTS
 WITH REQUIRED LANDSCAPING AND PROVIDE FINAL LOCATIONS
 FOR SCREENING.
  
  
 13. SATISFIED. PLANT LIST NEEDS TO BE MODIFIED TO
 INCLUDE ALL PLANT MATERIAL FOR THE PROJECT,
 AND SEPARATE PLANT LIST FOR EACH OPEN SPACE AREA
 PROVIDED FOR REFERENCE TO SHOW COMPLIANCE WITH THE OPEN
 SPACE TYPE REQUIREMENTS.
 COULD NOT LOCATE A COMPLETE PLANT LIST.
 8/17/22 PLANT LIST NOT FOUND ON L004 AS INDICATED IN
 THE RESPONSE MEMO.
  
 11/29/22 PROVIDE A COMPLETE PLANT LIST FOR THE PROJECT
 ON ONE SHEET. SHEET L603 IS NOT A COMPLETE PLANT LIST.
  
  
  
 14. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L.
 PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT
 MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT
 TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE
 LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH
 FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH
 FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED
 ON THE PLANT LIST.
 SHOW THE PERCENTAGE BASED ON THE FINAL PLANT LIST.
 8/17/22 DETAIL STILL NOT INCLUDED ON THE LANDSCAPE
 PLANS.
 9/1/22 PROVIDE THE ACTUAL PERCENTAGE BASED ON THE
 COMPLETE PLANT LIST ON ONE SHEET.
 11/29/22 PROVIDE THE ACTUAL PERCENTAGE BASED ON THE
 COMPLETE PLANT LIST ON ONE SHEET. SHEET L603 IS NOT A
 COMPLETE PLANT LIST.
  
  
 15. SATISFIED. PROVIDE SCREENING HEDGES FOR ALL GROUND
 MOUNTED VALVES AND EQUIPMENT AND ADD A NOTE THAT ALL
 EQUIPMENT WILL BE SCREENED.
 NEED FURTHER DETAIL PROVIDED ON THE PLANS.
 8/17/22 DETAIL STILL NOT INCLUDED ON THE LANDSCAPE
 PLANS.
  
 ADDITIONAL COMMENTS 7/8/22:
  
 16. SATISFIED. PROVIDE THE TOTAL TREE CANOPY MITIGATION
 PROVIDED FROM THE ADDED TREES ON THE PLANT LIST.
 9/1/22 RESPONSES INDICATE THIS INFORMATION WAS PROVIDED
 ON SHEET L112,
 BUT WAS NOT FOUND.
  
 17. SATISFIED. THE PALM SUBSTITUTION INFORMATION
 PROVIDED IN THE LANDSCAPE CALCULATIONS CHART ON SHEET
 L002 IS NOT CONSISTENT WITH CURRENT CODE REQUIREMENTS.
 REVISE.
  
 ADDITIONAL COMMENTS 9/1/22:
 18. CONDITIONALLY SATISFIED. LOCATIONS IN REQUIRED
 PUBLIC OPEN SPACES FOR POSSIBLE AIPP ON SHEET L008 AND
 L010 DO NOT SHOW DETAIL OF HOW THE REQUIRED LANDSCAPING
 WOULD BE AFFECTED.
 11/29/22: THE NOTE PLACED ON SHEET L008 DOES NOT
 ADDRESS THE COMMENT. REQUIRED LANDSCAPING SHOULD NOT BE
 AFFECTED BY ART PLACEMENT.
  
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE STREET TREES AND
 RIGHT OF WAY LANDSCAPING AND IRRIGATION. THIS WILL BE
 THROUGH A SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  
 4. FINAL LOCATIONS FOR PUBLIC ART WILL REQUIRE AN
 AMENDMENT TO THE SITE PLAN TO VERIFY ALL LANDSCAPE
 REQUIREMENTS ARE MET.
  
  

Review Stop L LANDSCAPING
Rev No 5 Status F Date 11-29-2022 Cont ID  
Sent By rcaranci Date 11-29-2022 Time 13:10 Rev Time 0.00
Received By rcaranci Date 11-29-2022 Time 13:10 Sent To  
Notes
2022-11-29 13:11:03FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: TRANSIT VILLAGE Z22040014
 NOVEMBER 28, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 1. PARTIALLY SATISFIED. SECTION 94-448 (D)(3) REQUIRES
 NATIVE TREES AND PALMS IN GOOD CONDITION TO BE
 PRESERVED ON SITE OR RELOCATED. ANSI A 300 (PART 5)
 STANDARDS SPECIFY EXAMPLES OF SUITABILITY RATINGS OF
 GOOD, MODERATE, OR POOR FOR RELOCATION. PROVIDE AN
 ARBORISTS REPORT RATING THE CONDITION AND RELOCATION
 POTENTIAL FOR THE NATIVE TREES AND PALMS. THE TREE
 DISPOSITION MUST INDICATE WHETHER THE TREE WILL BE
 PRESERVED, RELOCATED OR REMOVED.
 PROVIDE CLEAR TREE MITIGATION PLAN SHEETS L100, L101,
 L412, AND L403, WITHOUT THE PROPOSED BUILDING SHOWN.
 THIS SHOULD BE AN OVERLAY OF THE CURRENT SURVEY
 RESEMBLING SHEET L003 CLEARLY SHOWING LOCATIONS AND
 DISPOSITION OF EXISTING TREES TO BE VERIFIED.
 8/17/22 L100 NEEDS TO HAVE THE BACKGROUND LAYERS
 REMOVED TO MAKE THE TREE LOCATIONS AND LABELS EASILY
 LOCATED AND IDENTIFIED ON THE PLAN.
 LOCATIONS OF RELOCATED TREES AND PALMS TO FULFILL THE
 STREET TREE REQUIREMENT NEEDS TO BE BACKED UP WITH
 SPECIFIC TREES INDICATED THAT WILL MEET THE QUALITY,
 SIZE AND CLEARANCE REQUIREMENTS.
 9/1/22 PROVIDE AN ARBORISTS REPORT RATING THE CONDITION
 AND RELOCATION POTENTIAL FOR THE NATIVE TREES AND PALMS
 THAT ARE SHOWN TO BE REMOVED ON THE DISPOSITION CHART
 AND PLAN. THE RESUBMITTAL NOW INDICATES A NUMBER OF
 NATIVE TREES PROPOSED TO BE REMOVED.
 11/29/22 PROVIDE AN ARBORISTS REPORT RATING THE
 CONDITION AND RELOCATION POTENTIAL FOR THE NATIVE TREES
 AND PALMS THAT ARE SHOWN TO BE REMOVED ON THE
 DISPOSITION CHART AND PLAN.
  
  
 2. SATISFIED. PROVIDE THE INDIVIDUAL AND TOTAL CANOPY
 MITIGATION DUE FOR ANY PROPOSED REMOVALS. TREES
 PROPOSED TO BE REMOVED WITH A CANOPY DIAMETER OF 20
 FEET OR MORE SHOULD HAVE THE MITIGATION SQUARE FOOTAGE
 CALCULATED BASED ON THE ACTUAL DIAMETER. TREES LESS
 THAN 20 FEET CANOPY DIAMETER AND PALMS SHOULD SHOW THE
 CATEGORY MITIGATION DUE.
 CHART HAS CHANGED, SO STATUS OF COMMENT CHANGED.
 THE FOLLOWING CORRECTIONS NEED TO BE MADE ON SHEET
 L601:
 ??? ILEX CASSINE IS A CATEGORY 2 TREE WITH 150 SQ FT OF
 MITIGATION DUE. CORRECT ON CHART FOR #006, 097, 098,
 190, AND 191.
 ??? CORRECT #125 TO SHOW ABOVE 20???
 ??? CORRECT #108 TO 300 SQ FT MITIGATION DUE FOR LIVE
 OAK CATEGORY 1.
  
 3. SATISFIED. PROVIDE A DIAGRAM OF THE REQUIRED AND
 PROVIDED PUBLIC AND PRIVATE OPEN SPACE AREAS FOR THE
 ZONING DISTRICT. IDENTIFY THE TYPE OF OPEN SPACE AS
 ALLOWED BY TABLE IV-7 AND DEFINITIONS IN SECTION
 94-109. SHOW HOW THE STANDARDS FOR THE TYPES OF OPEN
 SPACE ARE MET FOR VEGETATED AREAS AND TREE CANOPY
 SQUARE FOOTAGE BASED ON TABLE IV-8 ON THE LANDSCAPE
 PLAN. LANDSCAPE PLANS MUST MATCH THE ARCHITECTURAL
 PLANS AND CLEARLY IDENTIFY THE OPEN SPACE TYPE THEN
 DEMONSTRATE HOW THE REQUIREMENTS OF THAT TYPE ARE MET.
 TERRACE IS IDENTIFIED AS THE PRIVATE OPEN SPACE TYPE ON
 SHEET L002, BUT OTHER LABELS LIKE PLAZA FOR LEVEL 2 AND
 ROOFTOP PLAZA FOR LEVEL 4 APPEAR ON THE OTHER SHEETS.
 LEVEL 9 IS LABELED AS TERRACE BUT HAS THE
 CHARACTERISTICS OF ROOFTOP GARDEN.
 IN SUMMARY, THE REQUIRED OPEN SPACE NEEDS TO BE
 QUANTIFIED, IDENTIFIED AS TO THE TYPE, AND ALL
 REQUIREMENTS NEED TO BE SHOWN FOR THAT OPEN SPACE TYPE.
  
 PER SHEET L005.
 OPEN SPACE 1A, 1B, AND 1C. COURTYARD IS NOT AN ALLOWED
 PUBLIC OPEN SPACE TYPE IN TOD, SO IT IS NOT POSSIBLE TO
 VERIFY THE VEGETATED AND TREE CANOPY REQUIREMENTS.
 8/17/22 GARDEN COURTYARD IS SPECIFIED.
 9/1/22 SHOW THE PERIMETER OF EACH AREA SPECIFIED.
 PROVIDE THE TREE SPECIES ON THE TREE CANOPY CHART SO
 STAFF CAN VERIFY THE CREDITS. HIGHLIGHT THE VEGETATED
 AREA THAT IS PROVIDED WITHIN EACH OPEN SPACE BOUNDARY.
 1B REQUIRED VEGETATED AREA AND TREE CANOPY SHOULD BE
 THE SAME SQUARE FOOTAGE ON THE CHART. OVERALL LANDSCAPE
 REQUIREMENT CHART IS NOT NEEDED, EACH OPEN SPACE CHART
 MUST SHOW HOW REQUIREMENTS FOR THAT SPACE ARE MET FOR
 VEGETATED AREA AND TREE CANOPY.
  
 OPEN SPACE 2A. INTERIOR COURTYARD IS NOT AN ALLOWED
 PRIVATE OPEN SPACE TYPE IN TOD, SO IT IS NOT POSSIBLE
 TO VERIFY THE VEGETATED AND TREE CANOPY REQUIREMENTS.
 8/17/22 RENAMED GARDEN PLAZA, BUT CANNOT BE CLASSIFIED
 AS THIS UNLESS IT MEETS THE REQUIREMENTS INCLUDING
 BEING ON GROUND LEVEL.
 9/1/22 THESE AREAS ARE NOW SHOWN AS ADDITIONAL ON SHEET
 L008 AND NOT COUNTED TOWARD OPEN SPACE REQUIREMENTS,
 BUT IF NOT ON GROUND LEVEL CANNOT BE CALLED GARDEN
 PLAZA.
  
  
  
 OPEN SPACE 4A AND 4B, TERRACE IS AN ALLOWED PRIVATE
 OPEN SPACE TYPE, BUT THE REQUIREMENTS SHOWN ARE NOT
 CONSISTENT WITH TERRACE REQUIREMENTS.
 TERRACE REQUIRES 20% VEGETATED AREA AND MUST ABUT A
 RIGHT OF WAY ON AT LEAST ONE SIDE.
 8/17/22 CORRECTED ON SHEET L005. SHEET L002 IS
 INCOMPLETE.
 9/1/22 NOW SHOWN ON SHEET L006. SHOW THE PERIMETER OF
 EACH AREA SPECIFIED. PROVIDE THE TREE SPECIES ON THE
 TREE CANOPY CHART SO STAFF CAN VERIFY THE CREDITS.
 HIGHLIGHT THE VEGETATED AREA THAT IS PROVIDED WITHIN
 EACH OPEN SPACE BOUNDARY. OVERALL LANDSCAPE REQUIREMENT
 CHART IS NOT NEEDED, EACH OPEN SPACE CHART MUST SHOW
 HOW REQUIREMENTS FOR THAT SPACE ARE MET FOR VEGETATED
 AREA AND TREE CANOPY.
  
 OPEN SPACE 9A AND 9B. SHOULD BE ROOFTOP GARDEN AS
 REQUIRED BY TOD. THE VEGETATED AND TREE CANOPY
 REQUIREMENTS ARE 50% EACH FOR TOD.
 8/17/22 NOT CORRECTED.
 9/1/22 SHOW THE PERIMETER OF EACH AREA SPECIFIED.
 PROVIDE THE TREE SPECIES ON THE TREE CANOPY CHART SO
 STAFF CAN VERIFY THE CREDITS. HIGHLIGHT THE VEGETATED
 AREA THAT IS PROVIDED WITHIN EACH OPEN SPACE BOUNDARY.
 OVERALL LANDSCAPE REQUIREMENT CHART IS NOT NEEDED, EACH
 OPEN SPACE CHART MUST SHOW HOW REQUIREMENTS FOR THAT
 SPACE ARE MET FOR VEGETATED AREA AND TREE CANOPY. 9A
 DOES NOT MEET THE VEGETATED AREA REQUIRED.
  
 ALL SHEETS MUST BE CONSISTENT WITH LABELING OF OPEN
 SPACES.
 SHEET L002 DOES NOT MATCH L005.
 8/17/22 SHEET L002 SHOWS THE INDIVIDUAL AREAS, SHEET
 L005 CHART MUST SHOW THE BREAKDOWN FOR EACH AREA FOR
 THE VEGETATED AREA LOCATIONS, TREE CANOPY, ETC. AS
 SHOWN ON L002.
 9/1/22 SHEET NUMBERS HAVE BEEN REVISED.
  
  
 4. SATISFIED. ALL OPEN SPACE TYPES REQUIRING TREE
 CANOPY MUST SHOW THE TREE CANOPY SQUARE FOOTAGE FOR
 TREE TYPES BASED ON TABLE IV-8 AND PROVIDE THE TOTAL.
  
 TREE CANOPY CALCULATIONS ARE NOT CORRECT, MUST BE
 CALCULATED PER TABLE IV-8 WHICH WOULD BE ROUND NUMBERS.
 8/17/22 TREES MUST BE SHOWN THAT ARE BEING USED FOR
 CREDIT FOR OPEN SPACE TREE CANOPY REQUIREMENT AND THE
 CREDITS ASSIGNED SHOWN WITH TOTAL. THIS IS BEST
 ACCOMPLISHED WITH A PLANT LIST AND AREA SHOWN FOR EACH
 OPEN SPACE.
 9/1/22 AS NOTED IN THE PREVIOUS COMMENTS, PROVIDE THE
 TREE SPECIES ON THE TREE CANOPY CHART SO STAFF CAN
 VERIFY THE CREDITS.
  
  
  
  
 5. SATISFIED. IDENTIFY RELOCATED TREES OR PALMS ON THE
 PLANT LIST AND COUNT THEM TOWARD THE REQUIRED TREES IF
 THEY ARE TO BE USED ON SITE.
 NEED FURTHER DETAIL PROVIDED ON THE PLANS.
 8/17/22 RELOCATED TREES AND PALMS WERE NOT FOUND ON THE
 SHEETS REFERENCED.
 IDENTIFY THE LOCATIONS FOR THE TREES AND PALMS TO BE
 RELOCATED. THE ROYAL PALMS ARE THE ONLY RELOCATES
 MARKED AS GOING TO OTHER COUNTY PROPERTY ON THE
 DISPOSITION LIST.
  
  
  
 6. SATISFIED. PROVIDE INFORMATION ON THE REDUCTION OF
 THE GREEN SCREEN AREA FROM WHAT WAS APPROVED BY
 COMPARISON OF THE SQUARE FOOTAGE FROM THE ORIGINAL
 APPROVAL AND WHAT IS PROPOSED. PROVIDE DETAILS ON THE
 STRUCTURE AND THE PLANT MATERIAL.
  
 7. SATISFIED. THE AREA WITHIN THE BUS LOOP IS PROPOSED
 TO HAVE MOSAIC TILE RATHER THAN THE PLANTINGS
 ORIGINALLY APPROVED. DESCRIBE HOW THE ENVIRONMENT WILL
 BE IMPROVED WITHIN THE BUS LOOP.
  
 8. SATISFIED. LANDSCAPE SHEETS ARE IN TOO SMALL A SCALE
 TO CLEARLY IDENTIFY ALL PLANT MATERIAL. NEED TO BE
 SHOWN ON SEPARATE SHEETS AT A LARGER SCALE.
  
 1:20 SCALE WILL BE NEEDED TO CLEARLY SEE ALL DETAIL.
 NEED FURTHER DETAIL PROVIDED ON THE PLANS.
 8/17/22 THE SCALE IS STILL TOO SMALL TO SUFFICIENTLY
 REVIEW THE PLANS. THE COLOR EASEMENTS NEED TO BE
 REMOVED FROM THE PLANS. INDIVIDUAL SHEETS OF THE
 SEPARATE OPEN SPACE AREAS NEED TO BE CLEARLY DELINEATED
 AND UNNECESSARY INFORMATION REMOVED.
  
  
 9. SATISFIED. ARTIFICIAL TURF AREAS PROPOSED MUST MEET
 THE REQUIREMENTS OF SECTION 94-451, INCLUDING ALL AREAS
 THAT ARE ALLOWED BY CODE MUST NOT BE VISIBLE FROM A
 ROAD OR STREET.
  
  
 10. PARTIALLY SATISFIED. PROVIDE CALCULATIONS FOR
 REQUIRED STREET TREES AT MAXIMUM SPACING EVERY 30 FEET
 OR PORTION THEREOF FOR EACH STREETSCAPE LENGTH, AND
 SHOW THE NUMBER PROVIDED PER SECTION 94-113 AND 94-116.
 THE BANYAN STREETSCAPE IMPROVEMENTS NEED TO BE INCLUDED
 ON THE PLANS TO SHOW THE INTEGRATION OF THIS PROJECT
 WITH THE STREETSCAPE.
 THE BANYAN STREETSCAPE MUST BE SHOWN AS APPROVED.
 THERE ARE LARGE GAPS IN THE STREET TREE PLACEMENT ALONG
 CLEARWATER DRIVE THAT DO NOT HAVE TREE CANOPY PROVIDED
 FOR PEDESTRIANS ON THE SIDEWALK. 30 FOOT MAXIMUM
 SPACING MUST BE FOLLOWED, AND STREETSCAPE IS REQUIRED
 ADJACENT TO PUBLIC OPEN SPACES AND DROP OFFS.
 8/17/22 THERE IS A LARGE GAP WITH NO STREET TREES
 ADJACENT TO OPEN SPACE 1A. THERE IS A DROP OFF AREA
 ALONG CLEARWATER DRIVE THAT DOES NOT SHOW THE REQUIRED
 STREET TREES.
 BANYAN STREETSCAPE SHOWN IS NOT ACCURATE AND SHOWS
 PROPOSED CHANGES THAT STAFF DOES NOT SUPPORT.
 9/1/22 THERE IS A GAP WITH NO STREET TREES NORTH OF THE
 SECOND DRIVEWAY FROM BANYAN.
 THERE IS A DROP OFF AREA ALONG CLEARWATER DRIVE THAT
 DOES NOT SHOW THE REQUIRED STREET TREES AT THE 30 FOOT
 MAXIMUM SPACING.
 BANYAN STREETSCAPE SHOWN IS NOT ACCURATE AND SHOWS
 PROPOSED CHANGES THAT STAFF DOES NOT SUPPORT.
 THE STREET TREES ALONG THE RESIDENTIAL LOBBY ARE NOT
 LOCATED ADJACENT TO THE CURB IN THE 4 FOOT PLANTING
 STRIP AS REQUIRED. THERE IS ALSO A GAP IN THE STREET
 TREES ON THE NORTH SIDE OF THE THIRD DRIVEWAY.
 STRUCTURAL SOIL LOCATIONS MUST BE IDENTIFIED AND
 TYPICAL INSTALLATION DETAIL ADDED TO MEET THE CODE
 REQUIREMENT IN SECTION 94-113.
  
 11/29/22 THERE IS A GAP WITH NO STREET TREES NORTH OF
 THE SECOND DRIVEWAY FROM BANYAN.
 THERE IS A DROP OFF AREA ALONG CLEARWATER DRIVE THAT
 DOES NOT SHOW THE REQUIRED STREET TREES AT THE 30 FOOT
 MAXIMUM SPACING.
 SATISFIED. BANYAN STREETSCAPE SHOWN IS NOT ACCURATE AND
 SHOWS PROPOSED CHANGES THAT STAFF DOES NOT SUPPORT.
 THE STREET TREES ALONG THE RESIDENTIAL LOBBY ARE NOT
 LOCATED ADJACENT TO THE CURB IN THE 4 FOOT PLANTING
 STRIP AS REQUIRED. THERE IS ALSO A GAP IN THE STREET
 TREES ON THE NORTH SIDE OF THE THIRD DRIVEWAY.
 STRUCTURAL SOIL LOCATIONS MUST BE IDENTIFIED AND
 TYPICAL INSTALLATION DETAIL ADDED TO MEET THE CODE
 REQUIREMENT IN SECTION 94-113. DETAIL IS NOT CORRECT.
  
  
  
 11. SATISFIED. EXPLAIN IF THE EXISTING FPL TRANSMISSION
 LINES WILL STAY IN PLACE OR BE RELOCATED.
  
 12. PARTIALLY SATISFIED. SHOW ALL EXISTING AND PROPOSED
 WATER AND SEWER AND DRAINAGE LINES ON THE LANDSCAPE
 PLAN. SHOW LOCATIONS OF BACKFLOWS AND ADJUST LOCATIONS
 OF UTILITY LINES TO RESOLVE CONFLICTS WITH EXISTING AND
 PROPOSED TREES AND LANDSCAPING.
 WATERLINE EASEMENT SHOWN, BUT OTHER FIRE LINES, WATER
 AND SEWER SERVICE WERE NOT FOUND. NEED FURTHER DETAIL
 PROVIDED ON THE PLANS.
 8/17/22 DETAIL STILL NOT EVIDENT ON THE LANDSCAPE
 PLANS.
 9/1/22 THE LANDSCAPE PLANS DO NOT SHOW THE WATER, SEWER
 AND FIRE LINES TO ASSURE THERE ARE NO CONFLICTS WITH
 REQUIRED LANDSCAPING AND PROVIDE FINAL LOCATIONS FOR
 SCREENING.
  
 11/29/22 THE LANDSCAPE PLANS DO NOT SHOW THE WATER,
 SEWER AND FIRE LINES TO ASSURE THERE ARE NO CONFLICTS
 WITH REQUIRED LANDSCAPING AND PROVIDE FINAL LOCATIONS
 FOR SCREENING.
  
  
 13. PARTIALLY SATISFIED. PLANT LIST NEEDS TO BE
 MODIFIED TO INCLUDE ALL PLANT MATERIAL FOR THE PROJECT,
 AND SEPARATE PLANT LIST FOR EACH OPEN SPACE AREA
 PROVIDED FOR REFERENCE TO SHOW COMPLIANCE WITH THE OPEN
 SPACE TYPE REQUIREMENTS.
 COULD NOT LOCATE A COMPLETE PLANT LIST.
 8/17/22 PLANT LIST NOT FOUND ON L004 AS INDICATED IN
 THE RESPONSE MEMO.
  
 11/29/22 PROVIDE A COMPLETE PLANT LIST FOR THE PROJECT
 ON ONE SHEET. SHEET L603 IS NOT A COMPLETE PLANT LIST.
  
  
  
 14. PARTIALLY SATISFIED. SHOW COMPLIANCE WITH SECTION
 94-445 L. PLANT SPECIES. A MINIMUM OF 60 PERCENT OF
 PLANT MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT
 TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE
 LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH
 FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH
 FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED
 ON THE PLANT LIST.
 SHOW THE PERCENTAGE BASED ON THE FINAL PLANT LIST.
 8/17/22 DETAIL STILL NOT INCLUDED ON THE LANDSCAPE
 PLANS.
 9/1/22 PROVIDE THE ACTUAL PERCENTAGE BASED ON THE
 COMPLETE PLANT LIST ON ONE SHEET.
 11/29/22 PROVIDE THE ACTUAL PERCENTAGE BASED ON THE
 COMPLETE PLANT LIST ON ONE SHEET. SHEET L603 IS NOT A
 COMPLETE PLANT LIST.
  
  
 15. SATISFIED. PROVIDE SCREENING HEDGES FOR ALL GROUND
 MOUNTED VALVES AND EQUIPMENT AND ADD A NOTE THAT ALL
 EQUIPMENT WILL BE SCREENED.
 NEED FURTHER DETAIL PROVIDED ON THE PLANS.
 8/17/22 DETAIL STILL NOT INCLUDED ON THE LANDSCAPE
 PLANS.
  
 ADDITIONAL COMMENTS 7/8/22:
  
 16. NOT SATISFIED. PROVIDE THE TOTAL TREE CANOPY
 MITIGATION PROVIDED FROM THE ADDED TREES ON THE PLANT
 LIST.
 9/1/22 RESPONSES INDICATE THIS INFORMATION WAS PROVIDED
 ON SHEET L112,
 BUT WAS NOT FOUND.
  
 17. SATISFIED. THE PALM SUBSTITUTION INFORMATION
 PROVIDED IN THE LANDSCAPE CALCULATIONS CHART ON SHEET
 L002 IS NOT CONSISTENT WITH CURRENT CODE REQUIREMENTS.
 REVISE.
  
 ADDITIONAL COMMENTS 9/1/22:
 18. PARTIALLY SATISFIED. LOCATIONS IN REQUIRED PUBLIC
 OPEN SPACES FOR POSSIBLE AIPP ON SHEET L008 AND L010 DO
 NOT SHOW DETAIL OF HOW THE REQUIRED LANDSCAPING WOULD
 BE AFFECTED.
 11/29/22: THE NOTE PLACED ON SHEET L008 DOES NOT
 ADDRESS THE COMMENT. REQUIRED LANDSCAPING SHOULD NOT BE
 AFFECTED BY ART PLACEMENT.
  
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE STREET TREES AND
 RIGHT OF WAY LANDSCAPING AND IRRIGATION. THIS WILL BE
 THROUGH A SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  

Review Stop L LANDSCAPING
Rev No 4 Status F Date 09-15-2022 Cont ID  
Sent By rcaranci Date 09-15-2022 Time 16:46 Rev Time 0.00
Received By rcaranci Date 09-01-2022 Time 16:45 Sent To  
Notes
2022-09-15 16:46:32FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: TRANSIT VILLAGE Z22040014
 SEPTEMBER 1, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 1. PARTIALLY SATISFIED. SECTION 94-448 (D)(3) REQUIRES
 NATIVE TREES AND PALMS IN GOOD CONDITION TO BE
 PRESERVED ON SITE OR RELOCATED. ANSI A 300 (PART 5)
 STANDARDS SPECIFY EXAMPLES OF SUITABILITY RATINGS OF
 GOOD, MODERATE, OR POOR FOR RELOCATION. PROVIDE AN
 ARBORISTS REPORT RATING THE CONDITION AND RELOCATION
 POTENTIAL FOR THE NATIVE TREES AND PALMS. THE TREE
 DISPOSITION MUST INDICATE WHETHER THE TREE WILL BE
 PRESERVED, RELOCATED OR REMOVED.
 PROVIDE CLEAR TREE MITIGATION PLAN SHEETS L100, L101,
 L412, AND L403, WITHOUT THE PROPOSED BUILDING SHOWN.
 THIS SHOULD BE AN OVERLAY OF THE CURRENT SURVEY
 RESEMBLING SHEET L003 CLEARLY SHOWING LOCATIONS AND
 DISPOSITION OF EXISTING TREES TO BE VERIFIED.
 8/17/22 L100 NEEDS TO HAVE THE BACKGROUND LAYERS
 REMOVED TO MAKE THE TREE LOCATIONS AND LABELS EASILY
 LOCATED AND IDENTIFIED ON THE PLAN.
 LOCATIONS OF RELOCATED TREES AND PALMS TO FULFILL THE
 STREET TREE REQUIREMENT NEEDS TO BE BACKED UP WITH
 SPECIFIC TREES INDICATED THAT WILL MEET THE QUALITY,
 SIZE AND CLEARANCE REQUIREMENTS.
 9/1/22 PROVIDE AN ARBORISTS REPORT RATING THE CONDITION
 AND RELOCATION POTENTIAL FOR THE NATIVE TREES AND PALMS
 THAT ARE SHOWN TO BE REMOVED ON THE DISPOSITION CHART
 AND PLAN. THE RESUBMITTAL NOW INDICATES A NUMBER OF
 NATIVE TREES PROPOSED TO BE REMOVED.
  
 2. SATISFIED. PROVIDE THE INDIVIDUAL AND TOTAL CANOPY
 MITIGATION DUE FOR ANY PROPOSED REMOVALS. TREES
 PROPOSED TO BE REMOVED WITH A CANOPY DIAMETER OF 20
 FEET OR MORE SHOULD HAVE THE MITIGATION SQUARE FOOTAGE
 CALCULATED BASED ON THE ACTUAL DIAMETER. TREES LESS
 THAN 20 FEET CANOPY DIAMETER AND PALMS SHOULD SHOW THE
 CATEGORY MITIGATION DUE.
 CHART HAS CHANGED, SO STATUS OF COMMENT CHANGED.
 THE FOLLOWING CORRECTIONS NEED TO BE MADE ON SHEET
 L601:
 ??? ILEX CASSINE IS A CATEGORY 2 TREE WITH 150 SQ FT OF
 MITIGATION DUE. CORRECT ON CHART FOR #006, 097, 098,
 190, AND 191.
 ??? CORRECT #125 TO SHOW ABOVE 20???
 ??? CORRECT #108 TO 300 SQ FT MITIGATION DUE FOR LIVE
 OAK CATEGORY 1.
  
 3. PARTIALLY SATISFIED. PROVIDE A DIAGRAM OF THE
 REQUIRED AND PROVIDED PUBLIC AND PRIVATE OPEN SPACE
 AREAS FOR THE ZONING DISTRICT. IDENTIFY THE TYPE OF
 OPEN SPACE AS ALLOWED BY TABLE IV-7 AND DEFINITIONS IN
 SECTION 94-109. SHOW HOW THE STANDARDS FOR THE TYPES OF
 OPEN SPACE ARE MET FOR VEGETATED AREAS AND TREE CANOPY
 SQUARE FOOTAGE BASED ON TABLE IV-8 ON THE LANDSCAPE
 PLAN. LANDSCAPE PLANS MUST MATCH THE ARCHITECTURAL
 PLANS AND CLEARLY IDENTIFY THE OPEN SPACE TYPE THEN
 DEMONSTRATE HOW THE REQUIREMENTS OF THAT TYPE ARE MET.
 TERRACE IS IDENTIFIED AS THE PRIVATE OPEN SPACE TYPE ON
 SHEET L002, BUT OTHER LABELS LIKE PLAZA FOR LEVEL 2 AND
 ROOFTOP PLAZA FOR LEVEL 4 APPEAR ON THE OTHER SHEETS.
 LEVEL 9 IS LABELED AS TERRACE BUT HAS THE
 CHARACTERISTICS OF ROOFTOP GARDEN.
 IN SUMMARY, THE REQUIRED OPEN SPACE NEEDS TO BE
 QUANTIFIED, IDENTIFIED AS TO THE TYPE, AND ALL
 REQUIREMENTS NEED TO BE SHOWN FOR THAT OPEN SPACE TYPE.
  
 PER SHEET L005.
 OPEN SPACE 1A, 1B, AND 1C. COURTYARD IS NOT AN ALLOWED
 PUBLIC OPEN SPACE TYPE IN TOD, SO IT IS NOT POSSIBLE TO
 VERIFY THE VEGETATED AND TREE CANOPY REQUIREMENTS.
 8/17/22 GARDEN COURTYARD IS SPECIFIED.
 9/1/22 SHOW THE PERIMETER OF EACH AREA SPECIFIED.
 PROVIDE THE TREE SPECIES ON THE TREE CANOPY CHART SO
 STAFF CAN VERIFY THE CREDITS. HIGHLIGHT THE VEGETATED
 AREA THAT IS PROVIDED WITHIN EACH OPEN SPACE BOUNDARY.
 1B REQUIRED VEGETATED AREA AND TREE CANOPY SHOULD BE
 THE SAME SQUARE FOOTAGE ON THE CHART. OVERALL LANDSCAPE
 REQUIREMENT CHART IS NOT NEEDED, EACH OPEN SPACE CHART
 MUST SHOW HOW REQUIREMENTS FOR THAT SPACE ARE MET FOR
 VEGETATED AREA AND TREE CANOPY.
  
 OPEN SPACE 2A. INTERIOR COURTYARD IS NOT AN ALLOWED
 PRIVATE OPEN SPACE TYPE IN TOD, SO IT IS NOT POSSIBLE
 TO VERIFY THE VEGETATED AND TREE CANOPY REQUIREMENTS.
 8/17/22 RENAMED GARDEN PLAZA, BUT CANNOT BE CLASSIFIED
 AS THIS UNLESS IT MEETS THE REQUIREMENTS INCLUDING
 BEING ON GROUND LEVEL.
 9/1/22 THESE AREAS ARE NOW SHOWN AS ADDITIONAL ON SHEET
 L008 AND NOT COUNTED TOWARD OPEN SPACE REQUIREMENTS,
 BUT IF NOT ON GROUND LEVEL CANNOT BE CALLED GARDEN
 PLAZA.
  
  
  
 OPEN SPACE 4A AND 4B, TERRACE IS AN ALLOWED PRIVATE
 OPEN SPACE TYPE, BUT THE REQUIREMENTS SHOWN ARE NOT
 CONSISTENT WITH TERRACE REQUIREMENTS.
 TERRACE REQUIRES 20% VEGETATED AREA AND MUST ABUT A
 RIGHT OF WAY ON AT LEAST ONE SIDE.
 8/17/22 CORRECTED ON SHEET L005. SHEET L002 IS
 INCOMPLETE.
 9/1/22 NOW SHOWN ON SHEET L006. SHOW THE PERIMETER OF
 EACH AREA SPECIFIED. PROVIDE THE TREE SPECIES ON THE
 TREE CANOPY CHART SO STAFF CAN VERIFY THE CREDITS.
 HIGHLIGHT THE VEGETATED AREA THAT IS PROVIDED WITHIN
 EACH OPEN SPACE BOUNDARY. OVERALL LANDSCAPE REQUIREMENT
 CHART IS NOT NEEDED, EACH OPEN SPACE CHART MUST SHOW
 HOW REQUIREMENTS FOR THAT SPACE ARE MET FOR VEGETATED
 AREA AND TREE CANOPY.
  
 OPEN SPACE 9A AND 9B. SHOULD BE ROOFTOP GARDEN AS
 REQUIRED BY TOD. THE VEGETATED AND TREE CANOPY
 REQUIREMENTS ARE 50% EACH FOR TOD.
 8/17/22 NOT CORRECTED.
 9/1/22 SHOW THE PERIMETER OF EACH AREA SPECIFIED.
 PROVIDE THE TREE SPECIES ON THE TREE CANOPY CHART SO
 STAFF CAN VERIFY THE CREDITS. HIGHLIGHT THE VEGETATED
 AREA THAT IS PROVIDED WITHIN EACH OPEN SPACE BOUNDARY.
 OVERALL LANDSCAPE REQUIREMENT CHART IS NOT NEEDED, EACH
 OPEN SPACE CHART MUST SHOW HOW REQUIREMENTS FOR THAT
 SPACE ARE MET FOR VEGETATED AREA AND TREE CANOPY. 9A
 DOES NOT MEET THE VEGETATED AREA REQUIRED.
  
 ALL SHEETS MUST BE CONSISTENT WITH LABELING OF OPEN
 SPACES.
 SHEET L002 DOES NOT MATCH L005.
 8/17/22 SHEET L002 SHOWS THE INDIVIDUAL AREAS, SHEET
 L005 CHART MUST SHOW THE BREAKDOWN FOR EACH AREA FOR
 THE VEGETATED AREA LOCATIONS, TREE CANOPY, ETC. AS
 SHOWN ON L002.
 9/1/22 SHEET NUMBERS HAVE BEEN REVISED.
  
  
 4. PARTIALLY SATISFIED. ALL OPEN SPACE TYPES REQUIRING
 TREE CANOPY MUST SHOW THE TREE CANOPY SQUARE FOOTAGE
 FOR TREE TYPES BASED ON TABLE IV-8 AND PROVIDE THE
 TOTAL.
  
 TREE CANOPY CALCULATIONS ARE NOT CORRECT, MUST BE
 CALCULATED PER TABLE IV-8 WHICH WOULD BE ROUND NUMBERS.
 8/17/22 TREES MUST BE SHOWN THAT ARE BEING USED FOR
 CREDIT FOR OPEN SPACE TREE CANOPY REQUIREMENT AND THE
 CREDITS ASSIGNED SHOWN WITH TOTAL. THIS IS BEST
 ACCOMPLISHED WITH A PLANT LIST AND AREA SHOWN FOR EACH
 OPEN SPACE.
 9/1/22 AS NOTED IN THE PREVIOUS COMMENTS, PROVIDE THE
 TREE SPECIES ON THE TREE CANOPY CHART SO STAFF CAN
 VERIFY THE CREDITS.
  
  
  
  
 5. SATISFIED. IDENTIFY RELOCATED TREES OR PALMS ON THE
 PLANT LIST AND COUNT THEM TOWARD THE REQUIRED TREES IF
 THEY ARE TO BE USED ON SITE.
 NEED FURTHER DETAIL PROVIDED ON THE PLANS.
 8/17/22 RELOCATED TREES AND PALMS WERE NOT FOUND ON THE
 SHEETS REFERENCED.
 IDENTIFY THE LOCATIONS FOR THE TREES AND PALMS TO BE
 RELOCATED. THE ROYAL PALMS ARE THE ONLY RELOCATES
 MARKED AS GOING TO OTHER COUNTY PROPERTY ON THE
 DISPOSITION LIST.
  
  
  
 6. SATISFIED. PROVIDE INFORMATION ON THE REDUCTION OF
 THE GREEN SCREEN AREA FROM WHAT WAS APPROVED BY
 COMPARISON OF THE SQUARE FOOTAGE FROM THE ORIGINAL
 APPROVAL AND WHAT IS PROPOSED. PROVIDE DETAILS ON THE
 STRUCTURE AND THE PLANT MATERIAL.
  
 7. SATISFIED. THE AREA WITHIN THE BUS LOOP IS PROPOSED
 TO HAVE MOSAIC TILE RATHER THAN THE PLANTINGS
 ORIGINALLY APPROVED. DESCRIBE HOW THE ENVIRONMENT WILL
 BE IMPROVED WITHIN THE BUS LOOP.
  
 8. SATISFIED. LANDSCAPE SHEETS ARE IN TOO SMALL A SCALE
 TO CLEARLY IDENTIFY ALL PLANT MATERIAL. NEED TO BE
 SHOWN ON SEPARATE SHEETS AT A LARGER SCALE.
  
 1:20 SCALE WILL BE NEEDED TO CLEARLY SEE ALL DETAIL.
 NEED FURTHER DETAIL PROVIDED ON THE PLANS.
 8/17/22 THE SCALE IS STILL TOO SMALL TO SUFFICIENTLY
 REVIEW THE PLANS. THE COLOR EASEMENTS NEED TO BE
 REMOVED FROM THE PLANS. INDIVIDUAL SHEETS OF THE
 SEPARATE OPEN SPACE AREAS NEED TO BE CLEARLY DELINEATED
 AND UNNECESSARY INFORMATION REMOVED.
  
  
 9. SATISFIED. ARTIFICIAL TURF AREAS PROPOSED MUST MEET
 THE REQUIREMENTS OF SECTION 94-451, INCLUDING ALL AREAS
 THAT ARE ALLOWED BY CODE MUST NOT BE VISIBLE FROM A
 ROAD OR STREET.
  
  
 10. PARTIALLY SATISFIED. PROVIDE CALCULATIONS FOR
 REQUIRED STREET TREES AT MAXIMUM SPACING EVERY 30 FEET
 OR PORTION THEREOF FOR EACH STREETSCAPE LENGTH, AND
 SHOW THE NUMBER PROVIDED PER SECTION 94-113 AND 94-116.
 THE BANYAN STREETSCAPE IMPROVEMENTS NEED TO BE INCLUDED
 ON THE PLANS TO SHOW THE INTEGRATION OF THIS PROJECT
 WITH THE STREETSCAPE.
 THE BANYAN STREETSCAPE MUST BE SHOWN AS APPROVED.
 THERE ARE LARGE GAPS IN THE STREET TREE PLACEMENT ALONG
 CLEARWATER DRIVE THAT DO NOT HAVE TREE CANOPY PROVIDED
 FOR PEDESTRIANS ON THE SIDEWALK. 30 FOOT MAXIMUM
 SPACING MUST BE FOLLOWED, AND STREETSCAPE IS REQUIRED
 ADJACENT TO PUBLIC OPEN SPACES AND DROP OFFS.
 8/17/22 THERE IS A LARGE GAP WITH NO STREET TREES
 ADJACENT TO OPEN SPACE 1A. THERE IS A DROP OFF AREA
 ALONG CLEARWATER DRIVE THAT DOES NOT SHOW THE REQUIRED
 STREET TREES.
 BANYAN STREETSCAPE SHOWN IS NOT ACCURATE AND SHOWS
 PROPOSED CHANGES THAT STAFF DOES NOT SUPPORT.
 9/1/22 THERE IS A GAP WITH NO STREET TREES NORTH OF THE
 SECOND DRIVEWAY FROM BANYAN.
 THERE IS A DROP OFF AREA ALONG CLEARWATER DRIVE THAT
 DOES NOT SHOW THE REQUIRED STREET TREES AT THE 30 FOOT
 MAXIMUM SPACING.
 BANYAN STREETSCAPE SHOWN IS NOT ACCURATE AND SHOWS
 PROPOSED CHANGES THAT STAFF DOES NOT SUPPORT.
 THE STREET TREES ALONG THE RESIDENTIAL LOBBY ARE NOT
 LOCATED ADJACENT TO THE CURB IN THE 4 FOOT PLANTING
 STRIP AS REQUIRED. THERE IS ALSO A GAP IN THE STREET
 TREES ON THE NORTH SIDE OF THE THIRD DRIVEWAY.
 STRUCTURAL SOIL LOCATIONS MUST BE IDENTIFIED AND
 TYPICAL INSTALLATION DETAIL ADDED TO MEET THE CODE
 REQUIREMENT IN SECTION 94-113.
  
 11. SATISFIED. EXPLAIN IF THE EXISTING FPL TRANSMISSION
 LINES WILL STAY IN PLACE OR BE RELOCATED.
  
 12. PARTIALLY SATISFIED. SHOW ALL EXISTING AND PROPOSED
 WATER AND SEWER AND DRAINAGE LINES ON THE LANDSCAPE
 PLAN. SHOW LOCATIONS OF BACKFLOWS AND ADJUST LOCATIONS
 OF UTILITY LINES TO RESOLVE CONFLICTS WITH EXISTING AND
 PROPOSED TREES AND LANDSCAPING.
 WATERLINE EASEMENT SHOWN, BUT OTHER FIRE LINES, WATER
 AND SEWER SERVICE WERE NOT FOUND. NEED FURTHER DETAIL
 PROVIDED ON THE PLANS.
 8/17/22 DETAIL STILL NOT EVIDENT ON THE LANDSCAPE
 PLANS.
 9/1/22 THE LANDSCAPE PLANS DO NOT SHOW THE WATER, SEWER
 AND FIRE LINES TO ASSURE THERE ARE NO CONFLICTS WITH
 REQUIRED LANDSCAPING AND PROVIDE FINAL LOCATIONS FOR
 SCREENING.
  
 13. PARTIALLY SATISFIED. PLANT LIST NEEDS TO BE
 MODIFIED TO INCLUDE ALL PLANT MATERIAL FOR THE PROJECT,
 AND SEPARATE PLANT LIST FOR EACH OPEN SPACE AREA
 PROVIDED FOR REFERENCE TO SHOW COMPLIANCE WITH THE OPEN
 SPACE TYPE REQUIREMENTS.
 COULD NOT LOCATE A COMPLETE PLANT LIST.
 8/17/22 PLANT LIST NOT FOUND ON L004 AS INDICATED IN
 THE RESPONSE MEMO.
 9/1/22 PROVIDE A COMPLETE PLANT LIST FOR THE PROJECT ON
 ONE SHEET.
  
 14. NOT SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445
 L. PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT
 MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT
 TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE
 LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH
 FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH
 FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED
 ON THE PLANT LIST.
 SHOW THE PERCENTAGE BASED ON THE FINAL PLANT LIST.
 8/17/22 DETAIL STILL NOT INCLUDED ON THE LANDSCAPE
 PLANS.
 9/1/22 PROVIDE THE ACTUAL PERCENTAGE BASED ON THE
 COMPLETE PLANT LIST ON ONE SHEET.
  
  
  
 15. SATISFIED. PROVIDE SCREENING HEDGES FOR ALL GROUND
 MOUNTED VALVES AND EQUIPMENT AND ADD A NOTE THAT ALL
 EQUIPMENT WILL BE SCREENED.
 NEED FURTHER DETAIL PROVIDED ON THE PLANS.
 8/17/22 DETAIL STILL NOT INCLUDED ON THE LANDSCAPE
 PLANS.
  
  
 ADDITIONAL COMMENTS 7/8/22:
  
 16. NOT SATISFIED. PROVIDE THE TOTAL TREE CANOPY
 MITIGATION PROVIDED FROM THE ADDED TREES ON THE PLANT
 LIST.
 9/1/22 RESPONSES INDICATE THIS INFORMATION WAS PROVIDED
 ON SHEET L112, BUT WAS NOT FOUND.
  
 17. SATISFIED. THE PALM SUBSTITUTION INFORMATION
 PROVIDED IN THE LANDSCAPE CALCULATIONS CHART ON SHEET
 L002 IS NOT CONSISTENT WITH CURRENT CODE REQUIREMENTS.
 REVISE.
  
 ADDITIONAL COMMENTS 9/1/22:
 18. LOCATIONS IN REQUIRED PUBLIC OPEN SPACES FOR
 POSSIBLE AIPP ON SHEET L008 AND L010 DO NOT SHOW DETAIL
 OF HOW THE REQUIRED LANDSCAPING WOULD BE AFFECTED.
  
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE STREET TREES AND
 RIGHT OF WAY LANDSCAPING AND IRRIGATION. THIS WILL BE
 THROUGH A SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  

Review Stop L LANDSCAPING
Rev No 3 Status F Date 08-18-2022 Cont ID  
Sent By rcaranci Date 08-18-2022 Time 12:14 Rev Time 0.00
Received By rcaranci Date 08-18-2022 Time 12:14 Sent To  
Notes
2022-08-18 12:14:32FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: TRANSIT VILLAGE Z22040014
 AUGUST 17, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 1. PARTIALLY SATISFIED. SECTION 94-448 (D)(3) REQUIRES
 NATIVE TREES AND PALMS IN GOOD CONDITION TO BE
 PRESERVED ON SITE OR RELOCATED. ANSI A 300 (PART 5)
 STANDARDS SPECIFY EXAMPLES OF SUITABILITY RATINGS OF
 GOOD, MODERATE, OR POOR FOR RELOCATION. PROVIDE AN
 ARBORISTS REPORT RATING THE CONDITION AND RELOCATION
 POTENTIAL FOR THE NATIVE TREES AND PALMS. THE TREE
 DISPOSITION MUST INDICATE WHETHER THE TREE WILL BE
 PRESERVED, RELOCATED OR REMOVED.
 PROVIDE CLEAR TREE MITIGATION PLAN SHEETS L100, L101,
 L412, AND L403, WITHOUT THE PROPOSED BUILDING SHOWN.
 THIS SHOULD BE AN OVERLAY OF THE CURRENT SURVEY
 RESEMBLING SHEET L003 CLEARLY SHOWING LOCATIONS AND
 DISPOSITION OF EXISTING TREES TO BE VERIFIED.
 8/17/22 L100 NEEDS TO HAVE THE BACKGROUND LAYERS
 REMOVED TO MAKE THE TREE LOCATIONS AND LABELS EASILY
 LOCATED AND IDENTIFIED ON THE PLAN.
 LOCATIONS OF RELOCATED TREES AND PALMS TO FULFILL THE
 STREET TREE REQUIREMENT NEEDS TO BE BACKED UP WITH
 SPECIFIC TREES INDICATED THAT WILL MEET THE QUALITY,
 SIZE AND CLEARANCE REQUIREMENTS.
  
 2. PARTIALLY SATISFIED. PROVIDE THE INDIVIDUAL AND
 TOTAL CANOPY MITIGATION DUE FOR ANY PROPOSED REMOVALS.
 TREES PROPOSED TO BE REMOVED WITH A CANOPY DIAMETER OF
 20 FEET OR MORE SHOULD HAVE THE MITIGATION SQUARE
 FOOTAGE CALCULATED BASED ON THE ACTUAL DIAMETER. TREES
 LESS THAN 20 FEET CANOPY DIAMETER AND PALMS SHOULD SHOW
 THE CATEGORY MITIGATION DUE.
 CHART HAS CHANGED, SO STATUS OF COMMENT CHANGED.
 THE FOLLOWING CORRECTIONS NEED TO BE MADE ON SHEET
 L601:
 ? ILEX CASSINE IS A CATEGORY 2 TREE WITH 150 SQ FT OF
 MITIGATION DUE. CORRECT ON CHART FOR #006, 097, 098,
 190, AND 191.
 ? CORRECT #125 TO SHOW ABOVE 20?
 ? CORRECT #108 TO 300 SQ FT MITIGATION DUE FOR LIVE OAK
 CATEGORY 1.
  
 3. PARTIALLY SATISFIED. PROVIDE A DIAGRAM OF THE
 REQUIRED AND PROVIDED PUBLIC AND PRIVATE OPEN SPACE
 AREAS FOR THE ZONING DISTRICT. IDENTIFY THE TYPE OF
 OPEN SPACE AS ALLOWED BY TABLE IV-7 AND DEFINITIONS IN
 SECTION 94-109. SHOW HOW THE STANDARDS FOR THE TYPES OF
 OPEN SPACE ARE MET FOR VEGETATED AREAS AND TREE CANOPY
 SQUARE FOOTAGE BASED ON TABLE IV-8 ON THE LANDSCAPE
 PLAN. LANDSCAPE PLANS MUST MATCH THE ARCHITECTURAL
 PLANS AND CLEARLY IDENTIFY THE OPEN SPACE TYPE THEN
 DEMONSTRATE HOW THE REQUIREMENTS OF THAT TYPE ARE MET.
 TERRACE IS IDENTIFIED AS THE PRIVATE OPEN SPACE TYPE ON
 SHEET L002, BUT OTHER LABELS LIKE PLAZA FOR LEVEL 2 AND
 ROOFTOP PLAZA FOR LEVEL 4 APPEAR ON THE OTHER SHEETS.
 LEVEL 9 IS LABELED AS TERRACE BUT HAS THE
 CHARACTERISTICS OF ROOFTOP GARDEN.
 IN SUMMARY, THE REQUIRED OPEN SPACE NEEDS TO BE
 QUANTIFIED, IDENTIFIED AS TO THE TYPE, AND ALL
 REQUIREMENTS NEED TO BE SHOWN FOR THAT OPEN SPACE TYPE.
  
 PER SHEET L005.
 OPEN SPACE 1A, 1B, AND 1C. COURTYARD IS NOT AN ALLOWED
 PUBLIC OPEN SPACE TYPE IN TOD, SO IT IS NOT POSSIBLE TO
 VERIFY THE VEGETATED AND TREE CANOPY REQUIREMENTS.
 8/17/22 GARDEN COURTYARD IS SPECIFIED.
  
 OPEN SPACE 2A. INTERIOR COURTYARD IS NOT AN ALLOWED
 PRIVATE OPEN SPACE TYPE IN TOD, SO IT IS NOT POSSIBLE
 TO VERIFY THE VEGETATED AND TREE CANOPY REQUIREMENTS.
 8/17/22 RENAMED GARDEN PLAZA, BUT CANNOT BE CLASSIFIED
 AS THIS UNLESS IT MEETS THE REQUIREMENTS INCLUDING
 BEING ON GROUND LEVEL.
  
 OPEN SPACE 4A AND 4B, TERRACE IS AN ALLOWED PRIVATE
 OPEN SPACE TYPE, BUT THE REQUIREMENTS SHOWN ARE NOT
 CONSISTENT WITH TERRACE REQUIREMENTS.
 TERRACE REQUIRES 20% VEGETATED AREA AND MUST ABUT A
 RIGHT OF WAY ON AT LEAST ONE SIDE.
 8/17/22 CORRECTED ON SHEET L005. SHEET L002 IS
 INCOMPLETE.
  
 OPEN SPACE 9A AND 9B. SHOULD BE ROOFTOP GARDEN AS
 REQUIRED BY TOD. THE VEGETATED AND TREE CANOPY
 REQUIREMENTS ARE 50% EACH FOR TOD.
 8/17/22 NOT CORRECTED.
  
 ALL SHEETS MUST BE CONSISTENT WITH LABELING OF OPEN
 SPACES.
 SHEET L002 DOES NOT MATCH L005.
 8/17/22 SHEET L002 SHOWS THE INDIVIDUAL AREAS, SHEET
 L005 CHART MUST SHOW THE BREAKDOWN FOR EACH AREA FOR
 THE VEGETATED AREA LOCATIONS, TREE CANOPY, ETC. AS
 SHOWN ON L002.
  
  
 4. PARTIALLY SATISFIED. ALL OPEN SPACE TYPES REQUIRING
 TREE CANOPY MUST SHOW THE TREE CANOPY SQUARE FOOTAGE
 FOR TREE TYPES BASED ON TABLE IV-8 AND PROVIDE THE
 TOTAL.
  
 TREE CANOPY CALCULATIONS ARE NOT CORRECT, MUST BE
 CALCULATED PER TABLE IV-8 WHICH WOULD BE ROUND NUMBERS.
 8/17/22 TREES MUST BE SHOWN THAT ARE BEING USED FOR
 CREDIT FOR OPEN SPACE TREE CANOPY REQUIREMENT AND THE
 CREDITS ASSIGNED SHOWN WITH TOTAL. THIS IS BEST
 ACCOMPLISHED WITH A PLANT LIST AND AREA SHOWN FOR EACH
 OPEN SPACE.
  
  
  
 5. PARTIALLY SATISFIED. IDENTIFY RELOCATED TREES OR
 PALMS ON THE PLANT LIST AND COUNT THEM TOWARD THE
 REQUIRED TREES IF THEY ARE TO BE USED ON SITE.
 NEED FURTHER DETAIL PROVIDED ON THE PLANS.
 8/17/22 RELOCATED TREES AND PALMS WERE NOT FOUND ON THE
 SHEETS REFERENCED.
 IDENTIFY THE LOCATIONS FOR THE TREES AND PALMS TO BE
 RELOCATED. THE ROYAL PALMS ARE THE ONLY RELOCATES
 MARKED AS GOING TO OTHER COUNTY PROPERTY ON THE
 DISPOSITION LIST.
  
  
  
 6. SATISFIED. PROVIDE INFORMATION ON THE REDUCTION OF
 THE GREEN SCREEN AREA FROM WHAT WAS APPROVED BY
 COMPARISON OF THE SQUARE FOOTAGE FROM THE ORIGINAL
 APPROVAL AND WHAT IS PROPOSED. PROVIDE DETAILS ON THE
 STRUCTURE AND THE PLANT MATERIAL.
  
 7. SATISFIED. THE AREA WITHIN THE BUS LOOP IS PROPOSED
 TO HAVE MOSAIC TILE RATHER THAN THE PLANTINGS
 ORIGINALLY APPROVED. DESCRIBE HOW THE ENVIRONMENT WILL
 BE IMPROVED WITHIN THE BUS LOOP.
  
 8. PARTIALLY SATISFIED. LANDSCAPE SHEETS ARE IN TOO
 SMALL A SCALE TO CLEARLY IDENTIFY ALL PLANT MATERIAL.
 NEED TO BE SHOWN ON SEPARATE SHEETS AT A LARGER SCALE.
  
 1:20 SCALE WILL BE NEEDED TO CLEARLY SEE ALL DETAIL.
 NEED FURTHER DETAIL PROVIDED ON THE PLANS.
 8/17/22 THE SCALE IS STILL TOO SMALL TO SUFFICIENTLY
 REVIEW THE PLANS. THE COLOR EASEMENTS NEED TO BE
 REMOVED FROM THE PLANS. INDIVIDUAL SHEETS OF THE
 SEPARATE OPEN SPACE AREAS NEED TO BE CLEARLY DELINEATED
 AND UNNECESSARY INFORMATION REMOVED.
  
  
 9. SATISFIED. ARTIFICIAL TURF AREAS PROPOSED MUST MEET
 THE REQUIREMENTS OF SECTION 94-451, INCLUDING ALL AREAS
 THAT ARE ALLOWED BY CODE MUST NOT BE VISIBLE FROM A
 ROAD OR STREET.
  
  
 10. PARTIALLY SATISFIED. PROVIDE CALCULATIONS FOR
 REQUIRED STREET TREES AT MAXIMUM SPACING EVERY 30 FEET
 OR PORTION THEREOF FOR EACH STREETSCAPE LENGTH, AND
 SHOW THE NUMBER PROVIDED PER SECTION 94-113 AND 94-116.
 THE BANYAN STREETSCAPE IMPROVEMENTS NEED TO BE INCLUDED
 ON THE PLANS TO SHOW THE INTEGRATION OF THIS PROJECT
 WITH THE STREETSCAPE.
 THE BANYAN STREETSCAPE MUST BE SHOWN AS APPROVED.
 THERE ARE LARGE GAPS IN THE STREET TREE PLACEMENT ALONG
 CLEARWATER DRIVE THAT DO NOT HAVE TREE CANOPY PROVIDED
 FOR PEDESTRIANS ON THE SIDEWALK. 30 FOOT MAXIMUM
 SPACING MUST BE FOLLOWED, AND STREETSCAPE IS REQUIRED
 ADJACENT TO PUBLIC OPEN SPACES AND DROP OFFS.
 8/17/22 THERE IS A LARGE GAP WITH NO STREET TREES
 ADJACENT TO OPEN SPACE 1A. THERE IS A DROP OFF AREA
 ALONG CLEARWATER DRIVE THAT DOES NOT SHOW THE REQUIRED
 STREET TREES.
 BANYAN STREETSCAPE SHOWN IS NOT ACCURATE AND SHOWS
 PROPOSED CHANGES THAT STAFF DOES NOT SUPPORT.
  
 11. SATISFIED. EXPLAIN IF THE EXISTING FPL TRANSMISSION
 LINES WILL STAY IN PLACE OR BE RELOCATED.
  
 12. PARTIALLY SATISFIED. SHOW ALL EXISTING AND PROPOSED
 WATER AND SEWER AND DRAINAGE LINES ON THE LANDSCAPE
 PLAN. SHOW LOCATIONS OF BACKFLOWS AND ADJUST LOCATIONS
 OF UTILITY LINES TO RESOLVE CONFLICTS WITH EXISTING AND
 PROPOSED TREES AND LANDSCAPING.
 WATERLINE EASEMENT SHOWN, BUT OTHER FIRE LINES, WATER
 AND SEWER SERVICE WERE NOT FOUND. NEED FURTHER DETAIL
 PROVIDED ON THE PLANS.
 8/17/22 DETAIL STILL NOT EVIDENT ON THE LANDSCAPE
 PLANS.
  
 13. PARTIALLY SATISFIED. PLANT LIST NEEDS TO BE
 MODIFIED TO INCLUDE ALL PLANT MATERIAL FOR THE PROJECT,
 AND SEPARATE PLANT LIST FOR EACH OPEN SPACE AREA
 PROVIDED FOR REFERENCE TO SHOW COMPLIANCE WITH THE OPEN
 SPACE TYPE REQUIREMENTS.
 COULD NOT LOCATE A COMPLETE PLANT LIST.
 8/17/22 PLANT LIST NOT FOUND ON L004 AS INDICATED IN
 THE RESPONSE MEMO.
  
 14. NOT SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445
 L. PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT
 MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT
 TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE
 LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH
 FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH
 FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED
 ON THE PLANT LIST.
 SHOW THE PERCENTAGE BASED ON THE FINAL PLANT LIST.
 8/17/22 DETAIL STILL NOT INCLUDED ON THE LANDSCAPE
 PLANS.
  
  
  
 15. PARTIALLY SATISFIED. PROVIDE SCREENING HEDGES FOR
 ALL GROUND MOUNTED VALVES AND EQUIPMENT AND ADD A NOTE
 THAT ALL EQUIPMENT WILL BE SCREENED.
 NEED FURTHER DETAIL PROVIDED ON THE PLANS.
 8/17/22 DETAIL STILL NOT INCLUDED ON THE LANDSCAPE
 PLANS.
  
  
 ADDITIONAL COMMENTS 7/8/22:
  
 16. PROVIDE THE TOTAL TREE CANOPY MITIGATION PROVIDED
 FROM THE ADDED TREES ON THE PLANT LIST.
  
 17. THE PALM SUBSTITUTION INFORMATION PROVIDED IN THE
 LANDSCAPE CALCULATIONS CHART ON SHEET L002 IS NOT
 CONSISTENT WITH CURRENT CODE REQUIREMENTS. REVISE.
  
  
  
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE STREET TREES AND
 RIGHT OF WAY LANDSCAPING AND IRRIGATION. THIS WILL BE
 THROUGH A SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  

Review Stop L LANDSCAPING
Rev No 2 Status F Date 07-08-2022 Cont ID  
Sent By rcaranci Date 07-08-2022 Time 16:42 Rev Time 0.00
Received By rcaranci Date 07-08-2022 Time 16:42 Sent To  
Notes
2022-07-08 16:42:59FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: TRANSIT VILLAGE Z22040014
 JULY 8, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 1. PARTIALLY SATISFIED. SECTION 94-448 (D)(3) REQUIRES
 NATIVE TREES AND PALMS IN GOOD CONDITION TO BE
 PRESERVED ON SITE OR RELOCATED. ANSI A 300 (PART 5)
 STANDARDS SPECIFY EXAMPLES OF SUITABILITY RATINGS OF
 GOOD, MODERATE, OR POOR FOR RELOCATION. PROVIDE AN
 ARBORISTS REPORT RATING THE CONDITION AND RELOCATION
 POTENTIAL FOR THE NATIVE TREES AND PALMS. THE TREE
 DISPOSITION MUST INDICATE WHETHER THE TREE WILL BE
 PRESERVED, RELOCATED OR REMOVED.
 PROVIDE CLEAR TREE MITIGATION PLAN SHEETS L100, L101,
 L412, AND L403, WITHOUT THE PROPOSED BUILDING SHOWN.
 THIS SHOULD BE AN OVERLAY OF THE CURRENT SURVEY
 RESEMBLING SHEET L003 CLEARLY SHOWING LOCATIONS AND
 DISPOSITION OF EXISTING TREES TO BE VERIFIED.
  
 2. SATISFIED. PROVIDE THE INDIVIDUAL AND TOTAL CANOPY
 MITIGATION DUE FOR ANY PROPOSED REMOVALS. TREES
 PROPOSED TO BE REMOVED WITH A CANOPY DIAMETER OF 20
 FEET OR MORE SHOULD HAVE THE MITIGATION SQUARE FOOTAGE
 CALCULATED BASED ON THE ACTUAL DIAMETER. TREES LESS
 THAN 20 FEET CANOPY DIAMETER AND PALMS SHOULD SHOW THE
 CATEGORY MITIGATION DUE.
  
 3. PARTIALLY SATISFIED. PROVIDE A DIAGRAM OF THE
 REQUIRED AND PROVIDED PUBLIC AND PRIVATE OPEN SPACE
 AREAS FOR THE ZONING DISTRICT. IDENTIFY THE TYPE OF
 OPEN SPACE AS ALLOWED BY TABLE IV-7 AND DEFINITIONS IN
 SECTION 94-109. SHOW HOW THE STANDARDS FOR THE TYPES OF
 OPEN SPACE ARE MET FOR VEGETATED AREAS AND TREE CANOPY
 SQUARE FOOTAGE BASED ON TABLE IV-8 ON THE LANDSCAPE
 PLAN. LANDSCAPE PLANS MUST MATCH THE ARCHITECTURAL
 PLANS AND CLEARLY IDENTIFY THE OPEN SPACE TYPE THEN
 DEMONSTRATE HOW THE REQUIREMENTS OF THAT TYPE ARE MET.
 TERRACE IS IDENTIFIED AS THE PRIVATE OPEN SPACE TYPE ON
 SHEET L002, BUT OTHER LABELS LIKE PLAZA FOR LEVEL 2 AND
 ROOFTOP PLAZA FOR LEVEL 4 APPEAR ON THE OTHER SHEETS.
 LEVEL 9 IS LABELED AS TERRACE BUT HAS THE
 CHARACTERISTICS OF ROOFTOP GARDEN.
 IN SUMMARY, THE REQUIRED OPEN SPACE NEEDS TO BE
 QUANTIFIED, IDENTIFIED AS TO THE TYPE, AND ALL
 REQUIREMENTS NEED TO BE SHOWN FOR THAT OPEN SPACE TYPE.
  
 PER SHEET L005.
 OPEN SPACE 1A, 1B, AND 1C. COURTYARD IS NOT AN ALLOWED
 PUBLIC OPEN SPACE TYPE IN TOD, SO IT IS NOT POSSIBLE TO
 VERIFY THE VEGETATED AND TREE CANOPY REQUIREMENTS.
  
 OPEN SPACE 2A. INTERIOR COURTYARD IS NOT AN ALLOWED
 PRIVATE OPEN SPACE TYPE IN TOD, SO IT IS NOT POSSIBLE
 TO VERIFY THE VEGETATED AND TREE CANOPY REQUIREMENTS.
  
 OPEN SPACE 4A AND 4B, TERRACE IS AN ALLOWED PRIVATE
 OPEN SPACE TYPE, BUT THE REQUIREMENTS SHOWN ARE NOT
 CONSISTENT WITH TERRACE REQUIREMENTS.
 TERRACE REQUIRES 20% VEGETATED AREA AND MUST ABUT A
 RIGHT OF WAY ON AT LEAST ONE SIDE.
  
 OPEN SPACE 9A AND 9B. SHOULD BE ROOFTOP GARDEN AS
 REQUIRED BY TOD. THE VEGETATED AND TREE CANOPY
 REQUIREMENTS ARE 50% EACH FOR TOD.
  
 ALL SHEETS MUST BE CONSISTENT WITH LABELING OF OPEN
 SPACES.
 SHEET L002 DOES NOT MATCH L005.
  
  
  
 4. PARTIALLY SATISFIED. ALL OPEN SPACE TYPES REQUIRING
 TREE CANOPY MUST SHOW THE TREE CANOPY SQUARE FOOTAGE
 FOR TREE TYPES BASED ON TABLE IV-8 AND PROVIDE THE
 TOTAL.
  
 TREE CANOPY CALCULATIONS ARE NOT CORRECT, MUST BE
 CALCULATED PER TABLE IV-8 WHICH WOULD BE ROUND NUMBERS.
  
  
  
 5. PARTIALLY SATISFIED. IDENTIFY RELOCATED TREES OR
 PALMS ON THE PLANT LIST AND COUNT THEM TOWARD THE
 REQUIRED TREES IF THEY ARE TO BE USED ON SITE.
 NEED FURTHER DETAIL PROVIDED ON THE PLANS.
  
  
 6. SATISFIED. PROVIDE INFORMATION ON THE REDUCTION OF
 THE GREEN SCREEN AREA FROM WHAT WAS APPROVED BY
 COMPARISON OF THE SQUARE FOOTAGE FROM THE ORIGINAL
 APPROVAL AND WHAT IS PROPOSED. PROVIDE DETAILS ON THE
 STRUCTURE AND THE PLANT MATERIAL.
  
 7. SATISFIED. THE AREA WITHIN THE BUS LOOP IS PROPOSED
 TO HAVE MOSAIC TILE RATHER THAN THE PLANTINGS
 ORIGINALLY APPROVED. DESCRIBE HOW THE ENVIRONMENT WILL
 BE IMPROVED WITHIN THE BUS LOOP.
  
 8. PARTIALLY SATISFIED. LANDSCAPE SHEETS ARE IN TOO
 SMALL A SCALE TO CLEARLY IDENTIFY ALL PLANT MATERIAL.
 NEED TO BE SHOWN ON SEPARATE SHEETS AT A LARGER SCALE.
  
 1:20 SCALE WILL BE NEEDED TO CLEARLY SEE ALL DETAIL.
 NEED FURTHER DETAIL PROVIDED ON THE PLANS.
  
  
 9. SATISFIED. ARTIFICIAL TURF AREAS PROPOSED MUST MEET
 THE REQUIREMENTS OF SECTION 94-451, INCLUDING ALL AREAS
 THAT ARE ALLOWED BY CODE MUST NOT BE VISIBLE FROM A
 ROAD OR STREET.
  
  
 10. PARTIALLY SATISFIED. PROVIDE CALCULATIONS FOR
 REQUIRED STREET TREES AT MAXIMUM SPACING EVERY 30 FEET
 OR PORTION THEREOF FOR EACH STREETSCAPE LENGTH, AND
 SHOW THE NUMBER PROVIDED PER SECTION 94-113 AND 94-116.
 THE BANYAN STREETSCAPE IMPROVEMENTS NEED TO BE INCLUDED
 ON THE PLANS TO SHOW THE INTEGRATION OF THIS PROJECT
 WITH THE STREETSCAPE.
 THE BANYAN STREETSCAPE MUST BE SHOWN AS APPROVED.
 THERE ARE LARGE GAPS IN THE STREET TREE PLACEMENT ALONG
 CLEARWATER DRIVE THAT DO NOT HAVE TREE CANOPY PROVIDED
 FOR PEDESTRIANS ON THE SIDEWALK. 30 FOOT MAXIMUM
 SPACING MUST BE FOLLOWED, AND STREETSCAPE IS REQUIRED
 ADJACENT TO PUBLIC OPEN SPACES AND DROP OFFS.
  
 11. SATISFIED. EXPLAIN IF THE EXISTING FPL TRANSMISSION
 LINES WILL STAY IN PLACE OR BE RELOCATED.
  
 12. PARTIALLY SATISFIED. SHOW ALL EXISTING AND PROPOSED
 WATER AND SEWER AND DRAINAGE LINES ON THE LANDSCAPE
 PLAN. SHOW LOCATIONS OF BACKFLOWS AND ADJUST LOCATIONS
 OF UTILITY LINES TO RESOLVE CONFLICTS WITH EXISTING AND
 PROPOSED TREES AND LANDSCAPING.
 WATERLINE EASEMENT SHOWN, BUT OTHER FIRE LINES, WATER
 AND SEWER SERVICE WERE NOT FOUND. NEED FURTHER DETAIL
 PROVIDED ON THE PLANS.
  
 13. PARTIALLY SATISFIED. PLANT LIST NEEDS TO BE
 MODIFIED TO INCLUDE ALL PLANT MATERIAL FOR THE PROJECT,
 AND SEPARATE PLANT LIST FOR EACH OPEN SPACE AREA
 PROVIDED FOR REFERENCE TO SHOW COMPLIANCE WITH THE OPEN
 SPACE TYPE REQUIREMENTS.
 COULD NOT LOCATE A COMPLETE PLANT LIST.
  
 14. NOT SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445
 L. PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT
 MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT
 TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE
 LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH
 FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH
 FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED
 ON THE PLANT LIST.
 SHOW THE PERCENTAGE BASED ON THE FINAL PLANT LIST.
  
  
 15. PARTIALLY SATISFIED. PROVIDE SCREENING HEDGES FOR
 ALL GROUND MOUNTED VALVES AND EQUIPMENT AND ADD A NOTE
 THAT ALL EQUIPMENT WILL BE SCREENED.
 NEED FURTHER DETAIL PROVIDED ON THE PLANS.
  
 ADDITIONAL COMMENTS 7/8/22:
  
 16. PROVIDE THE TOTAL TREE CANOPY MITIGATION PROVIDED
 FROM THE ADDED TREES ON THE PLANT LIST.
  
  
  
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE STREET TREES AND
 RIGHT OF WAY LANDSCAPING AND IRRIGATION. THIS WILL BE
 THROUGH A SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  

Review Stop L LANDSCAPING
Rev No 1 Status F Date 05-10-2022 Cont ID  
Sent By rcaranci Date 05-10-2022 Time 17:13 Rev Time 0.00
Received By rcaranci Date 05-10-2022 Time 17:13 Sent To  
Notes
2022-05-10 17:13:46FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: TRANSIT VILLAGE Z22040014
 MAY 10, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 1. SECTION 94-448 (D)(3) REQUIRES NATIVE TREES AND
 PALMS IN GOOD CONDITION TO BE PRESERVED ON SITE OR
 RELOCATED. ANSI A 300 (PART 5) STANDARDS SPECIFY
 EXAMPLES OF SUITABILITY RATINGS OF GOOD, MODERATE, OR
 POOR FOR RELOCATION. PROVIDE AN ARBORISTS REPORT RATING
 THE CONDITION AND RELOCATION POTENTIAL FOR THE NATIVE
 TREES AND PALMS. THE TREE DISPOSITION MUST INDICATE
 WHETHER THE TREE WILL BE PRESERVED, RELOCATED OR
 REMOVED.
 2. PROVIDE THE INDIVIDUAL AND TOTAL CANOPY MITIGATION
 DUE FOR ANY PROPOSED REMOVALS. TREES PROPOSED TO BE
 REMOVED WITH A CANOPY DIAMETER OF 20 FEET OR MORE
 SHOULD HAVE THE MITIGATION SQUARE FOOTAGE CALCULATED
 BASED ON THE ACTUAL DIAMETER. TREES LESS THAN 20 FEET
 CANOPY DIAMETER AND PALMS SHOULD SHOW THE CATEGORY
 MITIGATION DUE.
  
 3. PROVIDE A DIAGRAM OF THE REQUIRED AND PROVIDED
 PUBLIC AND PRIVATE OPEN SPACE AREAS FOR THE ZONING
 DISTRICT. IDENTIFY THE TYPE OF OPEN SPACE AS ALLOWED BY
 TABLE IV-7 AND DEFINITIONS IN SECTION 94-109. SHOW HOW
 THE STANDARDS FOR THE TYPES OF OPEN SPACE ARE MET FOR
 VEGETATED AREAS AND TREE CANOPY SQUARE FOOTAGE BASED ON
 TABLE IV-8 ON THE LANDSCAPE PLAN. LANDSCAPE PLANS MUST
 MATCH THE ARCHITECTURAL PLANS AND CLEARLY IDENTIFY THE
 OPEN SPACE TYPE THEN DEMONSTRATE HOW THE REQUIREMENTS
 OF THAT TYPE ARE MET.
 TERRACE IS IDENTIFIED AS THE PRIVATE OPEN SPACE TYPE ON
 SHEET L002, BUT OTHER LABELS LIKE PLAZA FOR LEVEL 2 AND
 ROOFTOP PLAZA FOR LEVEL 4 APPEAR ON THE OTHER SHEETS.
 LEVEL 9 IS LABELED AS TERRACE BUT HAS THE
 CHARACTERISTICS OF ROOFTOP GARDEN.
 IN SUMMARY, THE REQUIRED OPEN SPACE NEEDS TO BE
 QUANTIFIED, IDENTIFIED AS TO THE TYPE, AND ALL
 REQUIREMENTS NEED TO BE SHOWN FOR THAT OPEN SPACE TYPE.
  
  
 4. ALL OPEN SPACE TYPES REQUIRING TREE CANOPY MUST SHOW
 THE TREE CANOPY SQUARE FOOTAGE FOR TREE TYPES BASED ON
 TABLE IV-8 AND PROVIDE THE TOTAL.
  
  
 5. IDENTIFY RELOCATED TREES OR PALMS ON THE PLANT LIST
 AND COUNT THEM TOWARD THE REQUIRED TREES IF THEY ARE TO
 BE USED ON SITE.
  
 6. PROVIDE INFORMATION ON THE REDUCTION OF THE GREEN
 SCREEN AREA FROM WHAT WAS APPROVED BY COMPARISON OF THE
 SQUARE FOOTAGE FROM THE ORIGINAL APPROVAL AND WHAT IS
 PROPOSED. PROVIDE DETAILS ON THE STRUCTURE AND THE
 PLANT MATERIAL.
  
 7. THE AREA WITHIN THE BUS LOOP IS PROPOSED TO HAVE
 MOSAIC TILE RATHER THAN THE PLANTINGS ORIGINALLY
 APPROVED. DESCRIBE HOW THE ENVIRONMENT WILL BE IMPROVED
 WITHIN THE BUS LOOP.
  
 8. LANDSCAPE SHEETS ARE IN TOO SMALL A SCALE TO CLEARLY
 IDENTIFY ALL PLANT MATERIAL. NEED TO BE SHOWN ON
 SEPARATE SHEETS AT A LARGER SCALE.
  
 9. ARTIFICIAL TURF AREAS PROPOSED MUST MEET THE
 REQUIREMENTS OF SECTION 94-451, INCLUDING ALL AREAS
 THAT ARE ALLOWED BY CODE MUST NOT BE VISIBLE FROM A
 ROAD OR STREET.
  
  
 10. PROVIDE CALCULATIONS FOR REQUIRED STREET TREES AT
 MAXIMUM SPACING EVERY 30 FEET OR PORTION THEREOF FOR
 EACH STREETSCAPE LENGTH, AND SHOW THE NUMBER PROVIDED
 PER SECTION 94-113 AND 94-116. THE BANYAN STREETSCAPE
 IMPROVEMENTS NEED TO BE INCLUDED ON THE PLANS TO SHOW
 THE INTEGRATION OF THIS PROJECT WITH THE STREETSCAPE.
  
 11. EXPLAIN IF THE EXISTING FPL TRANSMISSION LINES WILL
 STAY IN PLACE OR BE RELOCATED.
  
 12. SHOW ALL EXISTING AND PROPOSED WATER AND SEWER AND
 DRAINAGE LINES ON THE LANDSCAPE PLAN. SHOW LOCATIONS OF
 BACKFLOWS AND ADJUST LOCATIONS OF UTILITY LINES TO
 RESOLVE CONFLICTS WITH EXISTING AND PROPOSED TREES AND
 LANDSCAPING.
  
 13. PLANT LIST NEEDS TO BE MODIFIED TO INCLUDE ALL
 PLANT MATERIAL FOR THE PROJECT,
 AND SEPARATE PLANT LIST FOR EACH OPEN SPACE AREA
 PROVIDED FOR REFERENCE TO SHOW COMPLIANCE WITH THE OPEN
 SPACE TYPE REQUIREMENTS.
  
 14. SHOW COMPLIANCE WITH SECTION 94-445 L. PLANT
 SPECIES. A MINIMUM OF 60 PERCENT OF PLANT MATERIAL
 ADDED SHALL BE FLORIDA NATIVE OR DROUGHT TOLERANT
 SPECIES SELECTED FROM THE CITY LIST OR THE LIST OF
 SPECIES IN THE MOST RECENT EDITION OF SOUTH FLORIDA
 WATER MANAGEMENT DISTRICT WATERWISE SOUTH FLORIDA
 LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED ON THE
 PLANT LIST.
  
  
 15. PROVIDE SCREENING HEDGES FOR ALL GROUND MOUNTED
 VALVES AND EQUIPMENT AND ADD A NOTE THAT ALL EQUIPMENT
 WILL BE SCREENED.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE STREET TREES AND
 RIGHT OF WAY LANDSCAPING AND IRRIGATION. THIS WILL BE
 THROUGH A SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  

Review Stop PARK PARKING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PU PUBLIC UTILITIES
Rev No 4 Status P Date 01-13-2023 Cont ID  
Sent By relizond Date 01-13-2023 Time 14:46 Rev Time 0.00
Received By relizond Date 01-13-2023 Time 14:21 Sent To  
Notes
2023-01-13 14:40:44-SEVERAL REVIEW COMMENTS FROM PRIOR SUBMITTALS HAVE YET
 TO BE ADDRESSED.
 -THE SITE PLAN CAN BE APPROVED ON PUBLIC UTILITIES
 ENGINEERING'S END WITH THE CONDITION OF OUTSTANDING
 COMMENTS BEING ADRESSED AS PART OF THE ENGINEERING
 REVIEW, WHICH INCLUDES BUT IS NOT LIMITED TO THE
 FOLLOWING:
 -ELABORATE ON THE SANITARY IMPROVEMENTS (ADDITION OF
 GRAVITY MAIN, AND SECTIONAL REPLACEMENT OF FORCE MAIN)
 -NORTHERN WATER MAIN CONNECTION MUST BE TO 12 IN MAIN,
 NOT JUNCTION BETWEEN 12" AND 36"
 -PER DETAILS WS-1 AND WS-4, SEPARATE CONNECTIONS MUST
 BE MADE FOR FIRE LINE AND POTABLE WATER
 -PROFILE NEEDED FOR ALL UTILITIES FROM TAP TO POINT OF
 SERVICE (WATER, GRAVITY, AND FORCE MAIN)
 -PROXIMITY BETWEEN PIPES IS TOO CLOSE (PROPOSED STORM,
 FORCE MAIN, AND EXISTING DRY UTILITIES)
 -APPROPRIATELY LABEL ALL EXISTING VALVES AND EXISTING
 UTILITY ASSESTS ON PLANS
 -LABEL ALL PROPOSED FITTINGS FOR BOTH WATER AND FORCE
 MAIN
 -DENOTE THAT THE PROJECT IS WITHIN THE BOUNDARIES OF
 LIFT STATION 41
 -SIZE AND MATERIAL NEEDS TO BE NOTED FOR ALL PROPOSED
 UTILITIES (SEWER)
 -PER PRIOR CONVERSATION, THE PRIVATE LIFT STATION CAN
 NOT BE TIED INTO THE EXISTING FORCE MAIN ON CLEARWATER
 DR.
 -FIRE FLOW TEST DATA FOR EXISTING SYSTEM NEEDED
 -A LEGEND NEEDS TO BE PROVIDED
 -CLEANOUTS NEAR THE PROPERTY LINE NEED TO BE DENOTED AS
 THE CITY'S POINT OF SERVICE
 -SEPARATE TAPS FOR WATER AND FIRE REQUIRED PER WS-1 AND
 WS-4
 -EXISTING SERVICES (WATER AND SEWER) THAT RUN TO THE
 PROPERTY BUT ARE NOT TO BE USED MUST BE CUT AND CAPPED
 AT THE MAIN
 -SERVICES LARGER THAN 2" IN DIAMETER MUST BE REMOVED
 -CLARIFY THE HYDRANT RELOCATIONS (NORTHERN RELOCATION
 NOT FULLY SHOWN ON PLANS, SOUTHERN RELOCATION IS NEAR
 350 PROJECT
 -EXISTING FORCE MAIN ON CLEARWATER DRIVE MUST BE
 REPLACED ENTIRELY (NOT IN SECTIONS)
 -SHOW STATIONING AND HORIZONTAL SEPARATION CLEARANCE
 BETWEEN PROPOSED UTILITIES AND EXISTING UTILITIES
 -SHOW SLOPE PERCENTAGE AND FLOW DIRECTION FOR ALL
 SANITARY LINES, AND CALL OUT MATERIAL FOR BOTH EXISTING
 AND PROPOSED
 -SANITARY SEWER SERVICE LINES 8" OR GREATER MUST BE
 TIED INTO SEWER SYSTEM VIA MANHOLE
  

Review Stop PU PUBLIC UTILITIES
Rev No 3 Status F Date 08-31-2022 Cont ID  
Sent By mtechnow Date 08-31-2022 Time   Rev Time 0.00
Received By rrossano Date 08-31-2022 Time   Sent To  
Notes
2022-08-31 20:43:40-CONNECT TO THE GRAVITY SYSTEM ON CLEARWATER. WILL MOST
 LIKELY NEED TO UPSIZE THE GRAVITY MAIN, FORCE MAIN AND
 LIFT STATION.
 -ADD LANGUAGE FOR WORK DONE NEAR THE 36? RCP/PCCP WM??
 PROVIDE EMERGENCY RESPONSE PLAN FOR ANY WORK BEING DONE
 IN THE AREA OF THE 36? WM? OR SOMETHING TO THAT EFFECT.
  
 MIKE TECHNOW, PE, PUBLIC UTILITIES
 [email protected]
  

Review Stop PU PUBLIC UTILITIES
Rev No 2 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PU PUBLIC UTILITIES
Rev No 1 Status F Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By mtechnow Date 05-11-2022 Time 15:25 Sent To  
Notes
2022-05-11 15:25:20-NO ISSUES WITH THE CONCEPTUAL UTILITY PLAN. SOME
 STANDARD COMMENTS HAVE BEEN ATTACHED BELOW:
 -REVISE BANYAN ST TO BANYAN BLVD.
 -SHOW ALL EXISTING UNDERGROUND UTILITIES WITHING CITY
 ROW ( BANYAN AND CLEARWATER). CALL OUT SIZE/TYPE.
 -CALL OUT THE EXISTING FM ON CLEARWATER DR AS 6? DIP.
 -CALL OUT THE LOCATION OF THE CAP AND LOCATION OF THE
 PROPOSED TAP ON THE 6? DIP FM. MAINTAIN A MIN. OF 10?
 DISTANCE BETWEEN THE TWO.
 -ADD NOTE FOR ALL EXISTING LATERALS: ?REHAB/REPLACE AS
 REQUIRED?
 -PROFILE OF SERVICE TAPS WILL BE NEEDED FOR ENGINEERING
 SUBMITTAL AS WELL AS LEVEL OF SERVICE CALCS. SEE LIST
 OF STANDARD COMMENTS.
  

Review Stop PU-CS PUBLIC UTILITIES CUSTOMER SRVC
Rev No 4 Status P Date 01-06-2023 Cont ID  
Sent By mhurley Date 01-06-2023 Time 16:58 Rev Time 0.00
Received By mhurley Date   Time   Sent To  
Notes
2023-01-06 16:58:24-ON L400A SHOW EXISTING WATER SERVICE LINE FOR PARK
 WATER METER AS SHOWN ON C03. ENSURE ANY PROPOSED TREES
 OR POLES ARE DISTANCED APPROX. 5 FEET FROM EXISTING
 WATER SERVICE.
 -WATER SERVICE DESIGN MAY NEED REVISION UPON FURTHER
 REVIEW AT ENGINEERING DEVELOPMENT SUBMITTAL.
 -BACKFLOW ASSEMBLY LOCATIONS MAY NEED ADJUSTMENT UPON
 FURTHER REVIEW AT ENGINEERING DEVELOPMENT SUBMITTAL.
 RESPECTFULLY,
 MARK HURLEY [email protected]

Review Stop PU-CS PUBLIC UTILITIES CUSTOMER SRVC
Rev No 3 Status F Date 12-12-2022 Cont ID  
Sent By mhurley Date 12-12-2022 Time 09:08 Rev Time 0.00
Received By mhurley Date   Time   Sent To  
Notes
2022-12-12 09:07:57PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING:
 -SHEET L400B SHOWS TREES TOO CLOSE TO FIRE HYDRANT,
 WATER SERVICE LINE, AND BACKFLOW ASSEMBLY.
 -SHEETS C03 AND L400B SHOW PROPOSED BACKFLOW ASSEMBLY
 IN THE RIGHT OF WAY. SHOULD BE LOCATED ON PRIVATE
 PROPERTY.
 -SHEET L400A DOES NOT SHOW UPSTREAM WATER SERVICE LINE
 FOR WATER METER NEAR PARK AS SHOWN ON C03. LOOKS LIKE
 IT WOULD BE TOO CLOSE TO POLE AND TREE. PLEASE SHOW
 WATER SERVICE LINE ON L400A AND ENSURE ANY PROPOSED
 TREES OR POLES ARE DISTANCED FROM EXISTING WATER
 SERVICE.
 -SHOW ALL WATER AND SEWER UTILITIES ON LANDSCAPING
 PLANS INCLUDING THE LARGE DIAMETER WATER MAIN AND 15
 FOOT WATERLINE EASEMENT THAT RUNS ACROSS THE NORTHWEST
 AREA OF PROPERTY. CANNOT CURRENTLY SEE IT ON L400C.
 -WATER SERVICE DESIGN MAY NEED REVISION UPON FURTHER
 REVIEW AT ENGINEERING DEVELOPMENT SUBMITTAL.
 RESPECTFULLY,
 MARK HURLEY [email protected]

Review Stop PU-CS PUBLIC UTILITIES CUSTOMER SRVC
Rev No 2 Status F Date 09-02-2022 Cont ID  
Sent By mhurley Date 09-02-2022 Time 14:35 Rev Time 0.00
Received By mhurley Date   Time   Sent To  
Notes
2022-09-02 14:33:32PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING:
 -LANDSCAPING TREES APPEAR TO BE PROPOSED AT THE SAME
 LOCATION METERED WATER SERVICES ARE PROPOSED, BUT
 DIFFICULT TO DISTINGUISH BETWEEN LANDSCAPING AND
 ENGINEERING PLAN SETS. PLEASE PROVIDE LANDSCAPING
 PLANTING SHEET THAT SHOWS ALL PLANTS, BUSHES, AND
 UTILITIES AROUND THE BUILDING AND NEAR THE PROPERTY
 LINES. MAKE SURE THERE ARE NO CONFLICT BETWEEN
 LANDSCAPING AND UTILITIES. ALSO SPECIFICALLY SHOW THE
 15 FOOT UTILITY EASEMENT AND LARGE WATER MAIN NEAR
 NORTHWEST AREA OF PROPERTY.
 RESPECTFULLY,
 MARK HURLEY [email protected]
  

Review Stop PU-CS PUBLIC UTILITIES CUSTOMER SRVC
Rev No 1 Status P Date 07-21-2022 Cont ID  
Sent By mhurley Date 07-21-2022 Time 10:02 Rev Time 0.00
Received By mhurley Date   Time   Sent To  
Notes
2022-07-21 10:01:49CONDITION OF APPROVAL:
  
 -PROPOSED TREES SEEM TO CONFLICT WITH SOME OF THE
 PROPOSED WATER SERVICES, METERS, AND BACKFLOW
 ASSEMBLIES IN TERMS OF LOCATION/DISTANCING. CONFLICTS
 NEED TO BE RESOLVED BY CONCLUSION OF ENGINEERING
 DEVELOPMENT SUBMITTAL.

Review Stop PW PUBLIC WORKS
Rev No 4 Status P Date 09-02-2022 Cont ID  
Sent By   Date 09-02-2022 Time   Rev Time 0.00
Received By   Date 09-02-2022 Time   Sent To  
Notes
2022-09-02 09:30:23NO FURTHER COMMENTS.
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045

Review Stop PW PUBLIC WORKS
Rev No 3 Status F Date 08-02-2022 Cont ID  
Sent By   Date 08-02-2022 Time   Rev Time 0.00
Received By   Date 08-02-2022 Time   Sent To  
Notes
2022-08-02 11:08:17PLEASE PROVIDE A LETTER FROM THE PRIVATE SANITATION
 SERVICE PROVIDER (FOR BOTH GARBAGE AND BULK WASTE)
 CONFIRMING THAT THEY COULD PROVIDE THE SANITATION
 COLLECTION SERVICE FOR THE TRANSIT VILLAGE WITH THE
 PROPOSED SITE PLAN.
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045

Review Stop PW PUBLIC WORKS
Rev No 2 Status F Date 07-07-2022 Cont ID  
Sent By   Date 07-07-2022 Time   Rev Time 0.00
Received By   Date 07-07-2022 Time   Sent To  
Notes
2022-07-07 15:14:49 
 PLEASE PROVIDE THE FOLLOWINGS:
 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID
 WASTE VOLUME PRODUCED ALONG WITH THE SIZE, TYPE AND
 QUANTITY OF THE CONTAINER (I.E. DUMPSTER/COMPACTOR)
 THAT WILL BE UTILIZED FOR THE SANITATION SERVICE.
 2- DETAILS FOR SANITATION SERVICE (I.E. SOLID WASTE
 CONTAINER(S) TYPE, COLLECTION LOCATION, ETC.).
 3- HEIGHT CLEARANCE OF THE LOADING AREAS FOR THE BULK
 ITEM PICK UP AND RECYCLING CONTAINERS
 4- UPDATED SOLID WASTE TURNING PLAN USING THE SPECS
 PROVIDED REFLECTING THE DYNAMIC ENVELOPEE AND THE
 VEHICLE`S WHEEL PATH.
 - DUAL AXLES
 - TRUCK LENGTH: 35 FT
 - TRUCK WIDTH: 11 FT
 - TURNING RADIUS:
 - SAE TURNING RADIUS: 32.5 FT
 - CURB-TO-CURB DIAMETER: 74 FT
 - WALL-TO-WALL DIAMETER: 86.3 FT
  
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045
  

Review Stop PW PUBLIC WORKS
Rev No 1 Status F Date 05-03-2022 Cont ID  
Sent By   Date 05-03-2022 Time   Rev Time  
Received By   Date 05-03-2022 Time   Sent To  
Notes
2022-05-03 13:23:21 
 PLEASE PROVIDE THE FOLLOWINGS:
 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID
 WASTE VOLUME PRODUCED ALONG WITH THE SIZE, TYPE AND
 QUANTITY OF THE CONTAINER (I.E. DUMPSTER/COMPACTOR)
 THAT WILL BE UTILIZED FOR THE SANITATION SERVICE.
  
 2- DETAILS FOR SANITATION SERVICE (I.E. SOLID WASTE
 CONTAINER(S) TYPE, COLLECTION LOCATION, ETC.). FOR A
 FREESTANDING SITE DUMPSTER ENCLOSURE, THE ENCLOSURE
 SHALL COMPLY WITH THE LATEST REVISION OF CITY OF WEST
 PALM BEACH GENERAL CONSTRUCTION-GARBAGE ENCLOSURE
 STANDARD, GC-7. (LINK TO THE LATEST REVISION OF THE
 GC-7 DOCUMENT: HTTPS://WWW.WPB.ORG/HOME/SHOWPUBLISHEDDO
 CUMENT/3690/637629060422100000)
  
 3- AUTOTURN EXHIBIT (DYNAMIC ENVELOPE AND THE VEHICLE?S
 WHEEL PATH) FOR THE SANITATION SERVICE, FRONT LOADER
 TRUCK WITH THE FOLLOWING SPECS:
 - DUAL AXLES
 - TRUCK LENGTH: 35 FT
 - TRUCK WIDTH: 11 FT
 - TURNING RADIUS:
 - SAE TURNING RADIUS: 32.5 FT
 - CURB-TO-CURB DIAMETER: 74 FT
 - WALL-TO-WALL DIAMETER: 86.3 FT
  
 4- DESIGNATED LOCATION FOR THE BULK ITEM PICK UP AND
 RECYCLING CONTAINERS
 5- OWNERS AND/OR OCCUPANTS OF PROPERTY THAT REQUIRE
 GREASE HAULING SERVICES SHALL ENSURE THAT THEIR GREASE
 TANKS OR CONTAINERS REMAIN CLEAN, AND ARE ENCLOSED AND
 NOT IN PUBLIC VIEW.
  
 6- IN CASE OF PROPOSING ADDITION OF ANY NEW CAN(S) IN
 THE CITY`S RIGHT-OF-WAY , THE LOCATION AND QUANTITY OF
 THE CAN(S) SHALL BE REVIEWED AND APPROVED BY PUBLIC
 WORKS DEPARTMENT AND THE CAN(S) SHALL BE TYPE, SIZE AND
 COLOR APPROVED BY PUBLIC WORKS DEPARTMENT. THE BUILDING
 MAINTENANCE IS RESPONSIBLE TO MAINTAIN AND SERVICE THE
 CAN(S).
  
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045
  

Review Stop STORM STORMWATER
Rev No 4 Status F Date 09-02-2022 Cont ID  
Sent By tward Date 09-02-2022 Time 18:02 Rev Time 0.00
Received By tward Date 09-02-2022 Time 18:18 Sent To  
Notes
2022-09-02 18:18:34THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 8/30/2022 SUBMITTAL:
  
 1. [SATISFIED] DRAINAGE STRUCTURES, EXFILTRATION
 TRENCHES, ETC. ARE NOT TO CROSS THE PROPERTY LINE.
  
 2. [SATISFIED] THE CITY DOES NOT ALLOW THE USE OF
 BLEEDERS WITH EXFILTRATION TRENCH SYSTEMS.
  
 3. [PARTIALLY SATISFIED ? SEE COMMENT #15 BELOW]
 VERTICAL DATUM REFERENCE (NAVD OR NGVD) NOT CONSISTENT
 ON THE ENGINEERING PLANS. PLEASE PROVIDE CONVERSION
 EQUATION BETWEEN THE VERTICAL DATUM USED ON THE PLANS
 (NGVD1929) TO NAVD1988.
  
 4. [SATISFIED] REVIEW BANYAN BLVD AS-BUILT DRAWINGS (OR
 DESIGN DRAWINGS) FOR STORM PIPE CONNECTIVITY. SHOW
 CURRENT LAYOUT OF BANYAN BLVD.
  
 5. [SATISFIED] PROVIDE FLOW ARROWS SHOWING DIRECTION OF
 SURFACE RUNOFF.
  
 6. [PARTIALLY SATISFIED ? SEE ADDITIONAL COMMENTS
 BELOW] PROVIDE CROSS SECTIONS FOR THE DRIVEWAYS (EXTEND
 TO HIGH POINT) AND ON-STREET PARKING AREAS SHOWING HOW
 PAVEMENT WITH SLOPE. PROVIDE DIMENSIONS FROM EDGE OF
 TRAVEL LANE TO ALL CURBING, BREAK POINTS AND RIGHT OF
 WAY LINE.
  
 7. [SATISFIED] PROVIDE CROSS SECTIONS AT EACH PROPERTY
 LINE FROM CENTERLINE OF ROAD TO FACE OF BUILDING.
 PROVIDE DIMENSIONS TO SURFACE FEATURES AND BREAK POINTS
 IN SURFACE SLOPES. LABEL THE RIGHT OF WAY WITH THE
 STREET NAME.
  
 8. [PARTIALLY SATISFIED ? IT?S REVIEWER?S OPINION THERE
 IS NOT AN EXISTING PIPE BETWEEN THE EXISTING CATCH
 BASINS AT THE NORTH END OF CLEARWATER] DEMO. PLANS DO
 NOT INDICATE WHETHER DRAINAGE SYSTEM ON CLEARWATER
 DEMOLITION PLAN INDICATES THE CURB INLETS ON CLEARWATER
 DRIVE ARE TO REMAIN BUT THE PGD PLAN CALLS FOR THEM TO
 BE REMOVED. EXISTING STRUCTURES SHOULD NOT REMAIN IF
 THE EXISTING PIPE CAN BE EXTENDED TO THE NEW
 STRUCTURES.
  
 9. [SATISFIED] BUILDINGS OVER EXFILTRATION TRENCHES
 SHOULD HAVE SUFFICIENT VERTICAL CLEARANCE BELOW THE
 BUILDING FOR MAINTENANCE EQUIPMENT FOR THE EXFILTRATION
 TRENCH AND FOR REPLACING THE EXFILTRATION TRENCH IN THE
 FUTURE WHEN IT NO LONGER IS FUNCTIONING AS INTENDED.
  
 10. [SATISFIED] STREETS SHALL BE PROPERLY SHOWN ON THE
 PLAN VIEWS.
  
 11. [SATISFIED] PROVIDE WRITTEN RESPONSE TO THESE
 COMMENTS.
  
 12. [SATISFIED] PROVIDE EXFILTRATION TRENCH DETAIL.
  
 13. [SATISFIED] PROVIDE CONTROL STRUCTURE DETAIL.
  
 14. [SATISFIED] IT APPEARS A COLUMN IS PROPOSED OVER
 EXISTING STORM PIPE APPROXIMATELY 33 FEET NORTH OF
 MATCHLINE C-07 AND 16 FEET WEST OF THE EAST PROPERTY
 LINE ON SHEET C-06.
  
 15. [PARTIALLY SATISFIED ? SEE COMMENTS FOR COVER, C-01
 AND C-02] SHEETS COVER, C-12 AND C-13 INDICATE THE
 VERTICAL DATUM REFERENCE IS NAVD1988. SHEETS C-06
 THROUGH C-09 INDICATE THE VERTICAL DATUM REFERENCE IS
 NGVD1929. SHEETS C-01 AND C-02 NEED TO LIST THE
 VERTTICAL DATUM REFERENCE AND CONVERSION EQUATION. THE
 COVER NEEDS THE CONVERSION EQUATION.
  
 16. [SATISFIED] WATER QUALITY TREATMENT AND PEAK FLOW
 ATTENUATION WILL BE NEEDED FOR THE ADDITIONAL
 IMPERVIOUS AREA IN THE RIGHT OF WAY.
  
 17. [SATISFIED] SEPARATE PLAN AND PROFILE SHEETS FOR
 CLEARWATER DRIVE WILL BE NEEDED FOR THE ENGINEERING
 PERMIT SUBMITTAL. A BASELINE ON CLEARWATER DRIVE WILL
 NEED TO BE ESTABLISHED FOR THE ENGINEERING PERMIT
 SUBMITTAL.
  
 NEW COMMENTS (8/30/22 CIVIL SUBMITTAL)
  
 18. NUMBER THE EXISTING AND PROPOSED STRUCTURES FOR
 EASE OF REFERENCE.
  
 19. AVOID LOCATING MANHOLE COVERS WITHIN SIDEWALKS.
  
 20. LEADER ARROW FOR LABEL PROPOSED STORM MH (TYP)
 (SHEET C-07 NORTH OF THE MIDDLE DRIVEWAY) NEEDS
 ADJUSTING.
  
 21. PROVIDE FLOW ARROW FOR ON-STREET KISS AND RIDE AREA
 ON SHEET C-07. ADJUST DIMENSION OF THE AREA ON SHEET
 C-04.
  
 22. CONCRETE APRONS WITHIN THE RIGHT OF WAY.
  
 23. WHY IS SIDEWALK WIDER THAN THE CROSS WALKS ACROSS
 THE TWO SOUTHERN DRIVEWAYS?
  
 24. PROVIDE VALLEY GUTTER/DROP CURB ACROSS DRIVEWAYS.
  
 25. SECTION A-A ? PROVIDE DIMENSION FROM R/W TO THE
 VALLEY GUTTER OR PAVEMENT FLOW LINE.
  
 26. SECTION B-B ? PROVIDE DIMENSION FROM R/W TO HIGH
 POINT OF DRIVEWAY.
  
 27. SECTION D-D ? INCREASE THE 5% SLOPE TO REDUCE, TO
 THE MAXIMUM EXTENT POSSIBLE, THE AMOUNT OF DRIVEWAY
 AREA FLOWING TO THE RIGHT OF WAY.
  
 28. SECTION E-E ? FLIP SYMBOLS ON SHEET C-06 TO POINT
 TO THE EAST. CONFIRM MULTI-USE PATH EXTENDS OUTSIDE THE
 RIGHT OF WAY.
  
 29. SECTION F-F ? WHAT DOES THE 11.6 FT DIMENSION REFER
 TO? PROVIDE SOUTHBOUND PAVEMENT WIDTH.
  
 30. JUSTIFY THE SIZE OF THE OUTFALL PIPE DIAMETER
 BETWEEN THE CONTROL STRUCTURE AND THE DRAINAGE SYSTEM
 WITHIN THE RIGHT OF WAY. FLOW IS LIMITED TO THE 8? X 8?
 ORIFICE.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  

Review Stop STORM STORMWATER
Rev No 3 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop STORM STORMWATER
Rev No 2 Status F Date 07-18-2022 Cont ID  
Sent By tward Date 07-18-2022 Time 16:28 Rev Time 0.00
Received By tward Date 07-18-2022 Time 16:29 Sent To  
Notes
2022-07-18 16:28:46THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 6/15/2022 SUBMITTAL:
  
 1. [SATISFIED] DRAINAGE STRUCTURES, EXFILTRATION
 TRENCHES, ETC. ARE NOT TO CROSS THE PROPERTY LINE.
  
 2. [SATISFIED] THE CITY DOES NOT ALLOW THE USE OF
 BLEEDERS WITH EXFILTRATION TRENCH SYSTEMS.
  
 3. [PARTIALLY SATISFIED - VERTICAL DATUM REFERENCE
 (NAVD OR NGVD) NOT CONSISTENT ON THE ENGINEERING
 PLANS.]PLEASE PROVIDE CONVERSION EQUATION BETWEEN THE
 VERTICAL DATUM USED ON THE PLANS (NGVD1929) TO
 NAVD1988.
  
 4. [PARTIALLY SATISFIED - REVIEW BANYAN BLVD AS-BUILT
 DRAWINGS (OR DESIGN DRAWINGS) FOR STORM PIPE
 CONNECTIVITY.] SHOW CURRENT LAYOUT OF BANYAN BLVD.
  
 5. [NOT SATISFIED] PROVIDE FLOW ARROWS SHOWING
 DIRECTION OF SURFACE RUNOFF.
  
 6. [NOT SATISFIED] PROVIDE CROSS SECTIONS FOR THE
 DRIVEWAYS (EXTEND TO HIGH POINT) AND ON-STREET PARKING
 AREAS SHOWING HOW PAVEMENT WITH SLOPE. PROVIDE
 DIMENSIONS FROM EDGE OF TRAVEL LANE TO ALL CURBING,
 BREAK POINTS AND RIGHT OF WAY LINE.
  
 7. [NOT SATISFIED] PROVIDE CROSS SECTIONS AT EACH
 PROPERTY LINE FROM CENTERLINE OF ROAD TO FACE OF
 BUILDING. PROVIDE DIMENSIONS TO SURFACE FEATURES AND
 BREAK POINTS IN SURFACE SLOPES. LABEL THE RIGHT OF WAY
 WITH THE STREET NAME.
  
 8. [PARTIALLY SATISFIED - DEMO. PLANS DO NOT INDICATE
 WHETHER DRAINAGE SYSTEM ON CLEARWATER DEMOLITION PLAN
 INDICATES THE CURB INLETS ON CLEARWATER DRIVE ARE TO
 REMAIN BUT THE PGD PLAN CALLS FOR THEM TO BE REMOVED.
 EXISTING STRUCTURES SHOULD NOT REMAIN IF THE EXISTING
 PIPE CAN BE EXTENDED TO THE NEW STRUCTURES.
  
 9. [NOT SATISFIED] BUILDINGS OVER EXFILTRATION TRENCHES
 SHOULD HAVE SUFFICIENT VERTICAL CLEARANCE BELOW THE
 BUILDING FOR MAINTENANCE EQUIPMENT FOR THE EXFILTRATION
 TRENCH AND FOR REPLACING THE EXFILTRATION TRENCH IN THE
 FUTURE WHEN IT NO LONGER IS FUNCTIONING AS INTENDED.
  
 10. [SATISFIED] STREETS SHALL BE PROPERLY SHOWN ON THE
 PLAN VIEWS.
  
 NEW COMMENTS:
  
 11. PROVIDE WRITTEN RESPONSE TO THESE COMMENTS.
  
 12. PROVIDE EXFILTRATION TRENCH DETAIL.
  
 13. PROVIDE CONTROL STRUCTURE DETAIL.
  
 14. IT APPEARS A COLUMN IS PROPOSED OVER EXISTING STORM
 PIPE APPROXIMATELY 33 FEET NORTH OF MATCHLINE C-07 AND
 16 FEET WEST OF THE EAST PROPERTY LINE ON SHEET C-06.
  
 15. SHEETS COVER, C-12 AND C-13 INDICATE THE VERTICAL
 DATUM REFERENCE IS NAVD1988. SHEETS C-06 THROUGH C-09
 INDICATE THE VERTICAL DATUM REFERENCE IS NGVD1929.
 SHEETS C-01 AND C-02 NEED TO LIST THE VERTTICAL DATUM
 REFERENCE AND CONVERSION EQUATION. THE COVER NEEDS THE
 CONVERSION EQUATION.
  
 16. WATER QUALITY TREATMENT AND PEAK FLOW ATTENUATION
 WILL BE NEEDED FOR THE ADDITIONAL IMPERVIOUS AREA IN
 THE RIGHT OF WAY.
  
 17. SEPARATE PLAN AND PROFILE SHEETS FOR CLEARWATER
 DRIVE WILL BE NEEDED FOR THE ENGINEERING PERMIT
 SUBMITTAL. A BASELINE ON CLEARWATER DRIVE WILL NEED TO
 BE ESTABLISHED FOR THE ENGINEERING PERMIT SUBMITTAL.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  

Review Stop STORM STORMWATER
Rev No 1 Status F Date 05-12-2022 Cont ID  
Sent By tward Date 05-12-2022 Time 13:09 Rev Time 0.00
Received By tward Date 05-12-2022 Time 13:09 Sent To  
Notes
2022-05-12 13:09:43THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. DRAINAGE STRUCTURES, EXFILTRATION TRENCHES, ETC. ARE
 NOT TO CROSS THE PROPERTY LINE.
  
 2. THE CITY DOES NOT ALLOW THE USE OF BLEEDERS WITH
 EXFILTRATION TRENCH SYSTEMS.
  
 3. PLEASE PROVIDE CONVERSION EQUATION BETWEEN THE
 VERTICAL DATUM USED ON THE PLANS (NGVD1929) TO
 NAVD1988.
  
 4. SHOW CURRENT LAYOUT OF BANYAN BLVD.
  
 5. PROVIDE FLOW ARROWS SHOWING DIRECTION OF SURFACE
 RUNOFF.
  
 6. PROVIDE CROSS SECTIONS FOR THE DRIVEWAYS (EXTEND TO
 HIGH POINT) AND ON-STREET PARKING AREAS SHOWING HOW
 PAVEMENT WITH SLOPE. PROVIDE DIMENSIONS FROM EDGE OF
 TRAVEL LANE TO ALL CURBING, BREAK POINTS AND RIGHT OF
 WAY LINE.
  
 7. PROVIDE CROSS SECTIONS AT EACH PROPERTY LINE FROM
 CENTERLINE OF ROAD TO FACE OF BUILDING. PROVIDE
 DIMENSIONS TO SURFACE FEATURES AND BREAK POINTS IN
 SURFACE SLOPES. LABEL THE RIGHT OF WAY WITH THE STREET
 NAME.
  
 8. DEMOLITION PLAN INDICATES THE CURB INLETS ON
 CLEARWATER DRIVE ARE TO REMAIN BUT THE PGD PLAN CALLS
 FOR THEM TO BE REMOVED. EXISTING STRUCTURES SHOULD NOT
 REMAIN IF THE EXISTING PIPE CAN BE EXTENDED TO THE NEW
 STRUCTURES.
  
 9. BUILDINGS OVER EXFILTRATION TRENCHES SHOULD HAVE
 SUFFICIENT VERTICAL CLEARANCE BELOW THE BUILDING FOR
 MAINTENANCE EQUIPMENT FOR THE EXFILTRATION TRENCH AND
 FOR REPLACING THE EXFILTRATION TRENCH IN THE FUTURE
 WHEN IT NO LONGER IS FUNCTIONING AS INTENDED.
  
 10. STREETS SHALL BE PROPERLY SHOWN ON THE PLAN VIEWS.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH
 THE ENGINEERING PERMIT SUBMITTAL.
  
 2. PROVIDE SPREAD CALCULATIONS FOR THE INLETS ON
 CLEARWATER DRIVE.
  
 2. PROVIDE COPY OF SFWMD ERP PERMIT BEFORE START OF
 CONSTRUCTION.
  
 3. PROVIDE EROSION CONTROL PLAN WITH THE ENGINEERING
 PERMIT SUBMITTAL.
  
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  

Review Stop SURVEY SURVEYING
Rev No 3 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop SURVEY SURVEYING
Rev No 2 Status F Date 07-21-2022 Cont ID  
Sent By vnoel Date 07-21-2022 Time 10:11 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
2022-07-21 11:04:24PREVIOUS ANSWERS TO THESE COMMENTS MADE NO SENSE.
  
 UNITY OF CONTROL/TITLE WILL BE REQUIRED
 LANDSCAPE TREES WITHIN THE CITY?S UTILITY EASEMENT WILL
 NOT BE ALLOWED.
 NEED TO SEE WHERE RELOCATED FPL POLES ARE IN RELATION
 TO EXISTING 36" WATER MAIN.
 36" WATER MAIN NEEDS TO BE CLEARLY LABELED FOR
 POTENTIAL CONFLICTS.
 PROPOSED FPL POLES ALONG WEST R/W OF CLEARWATER MAY
 CONFLICT WITH EXISTING SANITARY SEWER. CCTV WILL BE
 REQUIRED FOR ENTIRE LENGTH.
 WHAT TYPE OF OWNERSHIP IS PROPOSED FOR THE IMPROVEMENTS
 ABOVE 21' 4"
  
 ADDITIONAL COMMENTS 7.21.2022
  
 1. NEED PROFILE OF 36" WM AND ALL UTILITIES IN NW
 CORNER OF PROJECT.
 2. FPL POLE 1D16 SHOWN ON TOP OF WATER MAIN. REFER TO
 PREVIOUS COMMENT ABOVE.
 3. IS A VERTICAL SUBDIVISION PROPOSED? IF SO, NEED
 APPROVAL FROM BUILDING DEPT.
 4. RELOCATE SEWER VALVE FROM UNDER CURB IN VICINITY OF
 EXISTING FIRE EMERGENCY ACCESS.

Review Stop SURVEY SURVEYING
Rev No 1 Status F Date 05-12-2022 Cont ID  
Sent By vnoel Date 05-12-2022 Time 07:19 Rev Time  
Received By vnoel Date   Time   Sent To  
Notes
2022-05-12 09:37:441. UNITY OF CONTROL/TITLE WILL BE REQUIRED.
 2. LANDSCAPE TREES WITHIN THE CITY'S UTILITY EASEMENT
 WILL NOT BE ALLOWED.
 3. NEED TO SEE WHERE RELOCATED FPL POLES ARE IN
 RELATION TO EXISTING 36" WATER MAIN.
 4. 36" WATER MAIN NEEDS TO BE CLEARLY LABELED FOR
 POTENTIAL CONFLICTS.
 5. PROPOSED FPL POLES ALONG WEST R/W OF CLEARWATER MAY
 CONFLICT WITH EXISTING SANITARY SEWER. CCTV WILL BE
 REQUIRED FOR ENTIRE LENGTH.
 6, WHAT TYPE OF OWNERSHIP IS PROPOSED FOR THE
 IMPROVEMENTS ABOVE 21' 4"?
  
 ADDITIONAL COMMENTS WILL BE FORTHCOMING UPON FURTHER
 REVIEW.

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 4 Status P Date 09-02-2022 Cont ID  
Sent By   Date 09-02-2022 Time   Rev Time 0.00
Received By   Date 09-02-2022 Time   Sent To  
Notes
2022-09-02 13:38:57TRAFFIC STUDY COMMENTS
  
 THE FOLLOWING ENGINEERING CONDITIONS SHALL APPLY TO THE
 COMMENT RESPONSES BELOW. SUCH CONDITIONS SHALL APPLY AS
 A CONDITION OF APPROVAL OF AN ENGINEERING PERMIT FOR
 THE PROPOSED DEVELOPMENT. SPECIFICALLY:
  
 1) SETUP A METHODOLOGY MEETING WITH ENGINEERING
 SERVICES AND CONSEQUENTLY PROVIDE A REVISED TRAFFIC
 STUDY
 2) BASED ON THE RESULTS OF THE TRAFFIC ANALYSIS, IN
 CASE OF SIGNIFICANT IMPACT TO THE EXISTING
 TRANSPORTATION SYSTEM, TRANSPORTATION DEMAND MANAGEMENT
 (TDM) MEASURES INCLUSIVE OF FINANCIAL CONTRIBUTION TO
 TRANSIT OR MICROMOBILITY SERVICES MUST BE NEGOTIATED
 3) ALL PROPOSED TRAFFIC CONTROL FEATURES (I.E. STOP,
 YIELD, SIGNAL) AFFECTING PUBLIC ROW MUST BE SUPPORTED
 BY A TRAFFIC STUDY OR WARRANT ANALYSIS PRIOR TO
 APPROVAL AND IMPLEMENTATION
 4) A TRANSPORTATION SPECIFIC SITE PLAN MUST BE
 PROVIDED, PLEASE CONTACT ENGINEERING SERVICES FOR ANY
 QUESTIONS ON THIS MATTER
 5) PROPOSED ROADWAY CONFIGURATION MUST CONFORM TO
 EXISTING AND FUTURE CONDITIONS (I.E. BANYAN STREETSCAPE
 IMPROVEMENT PROJECT)
 6) PROVIDE A REVISED AND PROPER AUTOTURN ANALYIS.
 PLEASE CONTACT ENGINEERING SERVICES FOR ANY QUESTIONS
 OR SAMPLE ANALYSES
 7) EXPLAIN THE REASONING FOR LOCATING THE ADA STALLS ON
 THE GROUND FLOOR BY THE GARAGE RAMP. SHOWCASE THE PATH
 FROM SUCH STALLS TO THE NEAREST EXIT OR PEDESTRIAN
 ACCESS POINT(S). IN CASE OF SAFETY CONCERNS SUCH STALLS
 SHALL BE RELOCATED.
 8) AT LEAST TWO (2) SETS OF RECTANGULAR RAPID-FLASHING
 BEACONS (RRFB) SHOULD BE INSTALLED AT PEDESTRIAN
 CROSSINGS ALONG SITE FRONTAGE
 9) NO PUBLIC RIGHT-OF-WAY (ROW) TAKING SHOULD BE
 ALLOWED ALONG CLEARWATER DR, UNLESS AN ACCEPTABLE
 MULTI-USE PATH IS INSTALLED ALONG SITE FRONTAGE
  
  
  
 1) SATISFIED. PROVIDE ORIGINAL TRAFFIC STUDY INCLUSIVE
 OF THE REFERENCED EXHIBIT D. PLEASE PROVIDE FILE NAME,
 AS IT WAS NOT FOUND IN THE LATEST SUBMISSION. NOTE: THE
 REVISION TO THE SUPPLEMENTAL MEMO DATED MAY 19, 2015 IS
 NOT VALID, AS IT PROVIDES A MERE REALLOCATION OF
 TURNING VOLUMES FROM THE ORIGINAL ANALYSIS WITHOUT
 UPDATING THE ACTUAL NUMBER OF TRIPS GENERATED BY THE
 PROPOSED AND NEARBY EXISTING/FUTURE DEVELOPMENTS
  
 2) CONDITIONALLY SATISFIED. PROVIDE A REVISED TRAFFIC
 STUDY, ROADWAYS GEOMETRY AND NEARBY TRAFFIC CONDITIONS
 HAVE CHANGED SIGNIFICANTLY SINCE THE INITIAL SITE PLANS
 APPROVAL. REASONING PROVIDED FOR NOT CONDUCTING A NEW
 STUDY DO NOT SUBSIST; AS THERE IS NO FAILURE FROM THE
 CITY, NOR THE DEVELOPER, MOREOVER, VESTED TRIPS DO NOT
 HAVE ANY MEANING ON THIS REQUEST. THE SITE BEING WITHIN
 A TCEA DOES NOT PRECLUDE THE CITY TO REQUEST A REVISED
 STUDY OR FURTHER ANALYSIS IN THE CASE OF POTENTIAL
 SIGNIFICANT NEGATIVE IMPACTS TO THE EXISTING AND FUTURE
 TRANSPORTATION NETWORK. A METHODOLOGY MEETING WITH THE
 CITY IS STRONGLY RECOMMENDED
  
 TV 8/30/22 RESPONSE: CITY ADMINISTRATION AND TV HAVE
 AGREED TO WITHDRAW THIS COMMENT AT THIS TIME.
  
 CITY 9/2/2022 RESPONSE: THE CITY DID NOT AGREE TO
 WITHDRAW THIS COMMENT. HOWEVER, IT IS BEING REVISED AS
 FOLLOWS: THE CITY AGREES TO DEFER THE SUBMITTAL OF A
 REVISED TRAFFIC STUDY AS A CONDITION OF APPROVAL OF AN
 ENGINEERING PERMIT FOR THIS PROJECT. PLEASE REFER TO
 THE ENGINEERING CONDITIONAL LIST.
  
  
 3) CONDITIONALLY SATISFIED. DEPENDING ON THE OUTCOME OF
 THE TRAFFIC STUDY ANALYSIS, TDM MEASURES MAY NEED TO BE
 NEGOTIATED AND ESTABLISHED THE FACT THAT THE PROJECT IS
 TRANSIT ORIENTED DOES NOT MEAN THAT IT IS PRECLUDED
 FROM IMPLEMENTING MITIGATION MEASUREMENTS. NEGATIVE
 IMPACTS FROM THE RESIDENTIAL AND/OR COMMERCIAL.
 COMPONENTS OF THE PROPOSED DEVELOPMENT DO NOT GET A
 FREE PASS BY BEING PART OF A TRANSIT PROJECT. EVEN IF
 THE OVERALL NUMBER OF TRIPS GENERATED BY THE PROPOSED
 DEVELOPMENT ARE FEWER THAN THE ORIGINAL APPLICATION,
 THE ORIGINAL TRAFFIC COUNTS ARE SIGNIFICANTLY OUTDATED,
 AS THEY WERE PERFORMED MORE THAN 10 YEARS AGO.
 MOREOVER, THE SHIFT IN LAND USE BETWEEN COMMERCIAL AND
 RESIDENTIAL, THE CHANGE OF BOTH INTERNAL AND EXTERNAL
 ROAD GEOMETRIES, AND THE CHANGE OF EXISTING AND ASSUMED
 BACKGROUND VOLUMES COULD BRING A NEW SET OF SIGNIFICANT
 NEGATIVE IMPACTS, WHICH CANNOT BE IDENTIFIED NOR
 ADDRESSED TILL A REVISED TRAFFIC STUDY IS PROVIDED
  
 TV 8/30/22 RESPONSE: CITY ADMINISTRATION AND TV HAVE
 AGREED TO WITHDRAW THIS COMMENT AT THIS TIME.
  
 CITY 9/2/2022 RESPONSE: THE CITY DID NOT AGREE TO
 WITHDRAW THIS COMMENT. HOWEVER, IT IS BEING REVISED AS
 FOLLOWS: THE CITY AGREES TO DEFER THE SUBMITTAL OF A
 REVISED TRAFFIC STUDY AS A CONDITION OF APPROVAL OF AN
 ENGINEERING PERMIT FOR THIS PROJECT. PLEASE REFER TO
 THE ENGINEERING CONDITIONAL LIST.
  
  
 4) SATISFIED. PROVIDE COUNTY TPS LETTER
  
 5) SATISFIED. PROVIDE DETAILS PERTAINING THE TRANSITION
 FROM EXISTING TO FUTURE TRANSIT SERVICES, IN TERMS OF
 LOGISTICS AND OPERATIONS. COMMENT WILL BE SATISFIED
 ONCE DETAILS FROM PBC ARE PROVIDED.
  
 SITE PLAN COMMENTS
  
 6) CONDITIONALLY SATISFIED, PROVIDE A SEPARATE SITE
 PLAN SHOWCASING ONLY BASIC TRANSPORTATION FEATURES AND
 THEIR DIMENSIONS. SPECIFICALLY: SIDEWALK, CURB, PARKING
 STALLS, CROSSINGS, WALKWAY, ROADWAY, DRIVE ISLES,
 DRIVEWAYS, PAVEMENT MARKINGS, SIGNAGE. C-10 AND C-11
 ARE NOT PROPER, AS THEY ARE MISSING MOST OF THE
 DIMENSIONS AND MEASUREMENTS. PLEASE NAME THE
 TRANSPORTATION SITE PLANS T-01, T-02 AND HAVE THEM
 SEPARATE FROM ANY OTHER SET OF SITE PLANS (I.E. CIVIL,
 ARCHITECTURE, LANDSCAPE
  
 TV 8/30/22 RESPONSE: SEE SHEETS C-22 AND C-23
  
 CITY 9/2/2022 RESPONSE: A SEPARATE TRANSPORTATION SITE
 PLAN WAS PARTIALLY PROVIDED. HOWEVER, THERE ARE SOME
 DETAILS CONTAINED IN THE PROVIDED SITE PLANS THAT WILL
 NEED TO BE MODIFIED AS A CONDITION OF APPROVAL OF AN
 ENGINEERING PERMIT FOR THIS PROJECT. PLEASE REFER TO
 THE ENGINEERING CONDITIONAL LIST.
  
  
 7) CONDITIONALLY SATISFIED ON THE SITE PLAN, PLEASE
 SHOWCASE BASIC CURB DETAILS (I.E, DRIVEWAY AND PARKING
 STALLS) ON THE OPPOSITE SIDE OF THE ROADS SURROUNDING
 THE PROPOSED DEVELOPMENT. PLEASE PROVIDE DOCUMENT NAME
 AND SHEET NUMBER SHOWCASING SUCH FEATURES. THE
 APPLICANT MUST PROVIDE THE REQUESTED
 TRANSPORTATION-SPECIFIC-PLANS SO THAT THE REVIEWER CAN
 PROPERLY ANALYZE THE TRAFFIC AND TRANSPORTATION
 COMPONENT OF THE PROPOSED DEVELOPMENT. THANK YOU.
 PLEASE APPLY SUCH CRITERIA TO THE T-SERIES
 TRANSPORTATION PLANS
  
 TV 8/30/22 RESPONSE: SEE SITE PLANS AND TRAFFIC FEATURE
 SHEETS C-4, C-5, C-22, C-23
  
 CITY 9/2/2022 RESPONSE: A SEPARATE TRANSPORTATION SITE
 PLAN WAS PARTIALLY PROVIDED. HOWEVER, THERE ARE SOME
 DETAILS CONTAINED IN THIS SITE PLAN THAT WILL NEED TO
 BE MODIFIED AS A CONDITION TO APPROVAL OF AN
 ENGINEERING PERMIT FOR THIS PROJECT. PLEASE REFER TO
 THE ENGINEERING CONDITIONAL LIST.
  
  
 8) CONDITIONALLY SATISFIED. PROVIDE AUTOTURN ANALYSIS
 FOR GARBAGE TRUCK AND/OR SERVICE VEHICLES DRIVING IN
 AND OUT OF THE PROPOSED DEVELOPMENT WITH VEHICLE
 DYNAMIC ENVELOPES CLEARLY DEFINED. ANALYSIS SHOULD BE
 PROVIDED IN A SEPARATE FILE/DRAWING. PLEASE PROVIDE
 DOCUMENT NAME AND SHEET NUMBER SHOWCASING THE ANALYSIS.
 LATEST RESPONSE DID NOT PROVIDE FILE NAME AND SHEET
 NUMBER, PLEASE BE SPECIFIC. LATEST ANALYSIS DOES NOT
 SHOW THE WHEEL PATHS AND THERE ARE INSTANCES OF PARTIAL
 ENCROACHMENTS. USE DIFFERENT COLORS FOR VEHICLE DYNAMIC
 ENVELOPE AND WHEEL PATHS. CITY CAN PROVIDE SAMPLES OF
 PROPER ANALYSIS IF NEEDED / REQUESTED
  
 TV 8/30/22 RESPONSE: SEE SHEETS C-17 AND C-18
  
 CITY 9/2/2022 RESPONSE: AUTO TURN ANALYSIS WAS
 PARTIALLY PROVIDED. HOWEVER, THERE ARE SOME DETAILS
 CONTAINED IN THIS AUTO TURN ANALYSIS THAT NEED TO BE
 MODIFIED AS A CONDITION OF APPROVAL OF AN ENGINEERING
 PERMIT FOR THIS PROJECT. PLEASE REFER TO THE
 ENGINEERING CONDITIONAL LIST.
  
 9) SATISFIED. SEVERAL ADA PARKING. STALLS IN THE GARAGE
 MUST BE RELOCATED TO THE NEAREST ACCESS TO RESIDENTIAL
 UNIT AND ELEVATORS, SPECIFICALLY: 10, 11, 33, 34, 63,
 64
  
 10) CONDITIONALLY SATISFIED. REDUCE GARAGE RAMPS TO ONE
 SINGLE LANE, INSTALL CHEVRON MARKINGS ON THE SIDE OF
 THE RAMP FOR SUCH REDUCTION. IF TWO LANES ARE KEPT, A
 CONTINUOUS DIVIDING ELEMENT MUST BE INSTALLED (I.E.
 RAISED CURB WITH FLEXIBLE POLES). PROVIDE A TRAFFIC OR
 QUEUING ANALYSIS TO PROVE THAT DOUBLE ENTRY LANES ARE
 NECESSARY TO AVOID VEHICULAR SPILLBACK INTO CLEARWATER.
 PROVIDE THE CODE REFERENCE REQUIRING AMPLE STACKING OF
 EXISTING VEHICLES WITHIN THE SITE.
  
 TV 8/30/22 RESPONSE: LANES DIVIDER AND AUTO- TURNS
 PROVIDED. SEE SHEETS C-19 AND A5-10
  
 CITY 9/2/2022 RESPONSE: THERE ARE SOME DETAILS
 CONTAINED IN THESE REVISIONS TO SHEETS C-19 AND A5-10
 THAT NEED TO BE MODIFIED AS A CONDITION OF APPROVAL OF
 AN ENGINEERING PERMIT FOR THIS PROJECT
  
  
 11) SATISFIED. PLEASE PROVIDE A CONTACT PERSON THAT
 WOULD RECEIVE MARKED UP SITE PLANS. THERE ARE SEVERAL
 COMMENTS FOR THE PROPOSED DROP-OFF DESIGN THAT WOULD BE
 BETTER CONVENED WITH SITE PLAN MARK-UPS THAN COMMENTS
 HERE
  
 12) CONDITIONALLY SATISFIED. THE BANYAN STREETSCAPE
 IMPROVEMENTS PROJECT DOES NOT ALLOW LEFT TURNS FROM
 CLEARWATER TO BANYAN. PLEASE UPDATE THE SITE PLANS
 ACCORDINGLY. A LEFT-TURN APPROVAL DOES NOT MEAN THAT IT
 MUST BE IMPLEMENTED. THUS, IT IS RECOMMENDED TO REDUCE
 THE NORTHBOUND LANES TO A SINGLE ONE AT THE
 INTERSECTION OF CLEARWATER AND BANYAN. MOREOVER, IT IS
 SUGGESTED TO CONVERT THE CURRENT PROPOSED NORTHBOUND
 RIGHT-MOST LANE ON CLEARWATER DR TO A MERGE/
 ACCELERATION ONE.
  
 TV 8/30/22 RESPONSE: CITY ADMINISTRATION AND TV HAVE
 AGREED TO WITHDRAW THIS COMMENT AT THIS TIME.
  
 CITY 9/2/2022 RESPONSE: THE CITY DID NOT AGREE TO
 WITHDRAW THIS COMMENT. HOWEVER, IT IS BEING REVISED AS
 FOLLOWS: THE CITY AGREES TO DEFER THE SUBMITTAL OF A
 REVISED TRAFFIC STUDY AS A CONDITION OF APPROVAL OF AN
 ENGINEERING PERMIT FOR THIS PROJECT. PLEASE REFER TO
 THE ENGINEERING CONDITIONAL LIST.
  
  
 13) CONDITIONALLY SATISFIED. PEDESTRIAN CROSSINGS ON
 CLEARWATER MUST BE HIGH EMPHASIS ONES WITH INSTALLATION
 OF RECTANGULAR RAPID FLASHING BEACONS. STOP BARS AND
 SIGNAGE MUST BE REPLACED/REALLOCATED ACCORDINGLY. THE
 OPERATION WITHIN THE ITC ARE WITHIN COUNTY?S CONTROL.
 HOWEVER, CLEARWATER DR IS OUTSIDE OF THE ITC AND A CITY
 ROAD; THUS, COUNTY HAS NO CONTROL. MOREOVER, STOP BARS
 IN THE VICINITY OF THE PEDESTRIAN CROSSINGS WERE
 ALREADY PROPOSED BY THE DEVELOPER AND DEPICTED IN PRIOR
 SITE PLAN SUBMITTALS.
  
 TV 8/30/22 RESPONSE: CITY ADMINISTRATION AND TV HAVE
 AGREED TO WITHDRAW THIS COMMENT AT THIS TIME.
  
 CITY 9/2/2022 RESPONSE: THE CITY DID NOT AGREE TO
 WITHDRAW THIS COMMENT; HOWEVER, IT IS BEING REVISED AS
 FOLLOWS: THE CITY AGREES TO DEFER DISPOSITION OF THIS
 COMMENT UNTIL SUCH TIME IT WILL BE DETERMINED AS A
 CONDITION OF APPROVAL OF AN ENGINEERING PERMIT FOR THIS
 PROJECT. PLEASE REFER TO THE ENGINEERING CONDITIONAL
 LIST.
  
 14) CONDITIONALLY SATISFIED. PROVIDE A SUMMARY TABLE
 CAPTURING THE NUMBER OF METERED PARKING REMOVED OR
 RELOCATED. COORDINATE WITH PARKING DEPARTMENT
 PERTAINING SUCH REMOVAL AND RELOCATION.
  
 TV 8/30/22 RESPONSE: TV?S CURRENT INCENTIVE AGREEMENT
 WITH THE CITY (SECTION 9.1) REQUIRES THE CITY TO REMOVE
 THE PARKING METERS ON CLEARWATER DRIVE.
  
 CITY 9/2/2022 RESPONSE: PROVIDE THE DOCUMENTATION
 CONTAINING SUCH INCENTIVE AGREEMENT
  
 15) CONDITIONALLY SATISFIED. REMOVE THE STOP BARS ALONG
 CLEARWATER DR BY THE GARAGE ENTRANCE OR PROVIDE A
 TRAFFIC ANALYSIS WARRANTING THEIR IMPLEMENTATION.
  
 TV 8/30/22 RESPONSE: CITY ADMINISTRATION AND TV HAVE
 AGREED TO WITHDRAW THIS COMMENT AT THIS TIME.
  
 CITY 9/2/2022 RESPONSE: THE CITY DID NOT AGREE TO
 WITHDRAW THIS COMMENT. HOWEVER, IT IS BEING REVISED AS
 FOLLOWS: THE CITY AGREES TO DEFER THE SUBMITTAL OF A
 REVISED TRAFFIC STUDY AS A CONDITION OF APPROVAL OF AN
 ENGINEERING PERMIT FOR THIS PROJECT. PLEASE REFER TO
 THE ENGINEERING CONDITIONAL LIST.
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 3 Status F Date 08-19-2022 Cont ID  
Sent By   Date 08-19-2022 Time   Rev Time 0.00
Received By   Date 08-19-2022 Time   Sent To  
Notes
2022-08-19 16:37:28TRAFFIC STUDY COMMENTS
 1) SATISFIED. PROVIDE ORIGINAL TRAFFIC STUDY INCLUSIVE
 OF THE REFERENCED EXHIBIT D. PLEASE PROVIDE FILE NAME,
 AS IT WAS NOT FOUND IN THE LATEST SUBMISSION. NOTE: THE
 REVISION TO THE SUPPLEMENTAL MEMO DATED MAY 19, 2015 IS
 NOT VALID, AS IT PROVIDES A MERE RE-ALLOCATION OF
 TURNING VOLUMES FROM THE ORIGINAL ANALYSIS WITHOUT
 UPDATING THE ACTUAL NUMBER OF TRIPS GENERATED BY THE
 PROPOSED AND NEARBY EXISTING/FUTURE DEVELOPMENTS
 2) NOT SATISFIED. PROVIDE A REVISED TRAFFIC STUDY.
 ROADWAYS GEOMETRY AND NEARBY TRAFFIC CONDITIONS HAVE
 CHANGED SIGNIFICANTLY SINCE THE INITIAL SITE PLANS
 APPROVAL. REASONING PROVIDED FOR NOT CONDUCTING A NEW
 STUDY DO NOT SUBSIST; AS THERE IS NO FAILURE FROM THE
 CITY, NOR THE DEVELOPER. MOREOVER, VESTED TRIPS DO NOT
 HAVE ANY MEANING ON THIS REQUEST. THE SITE BEING WITHIN
 A TCEA DOES NOT PRECLUDE THE CITY TO REQUEST A REVISED
 STUDY OR FURTHER ANALYSIS IN THE CASE OF POTENTIAL
 SIGNIFICANT NEGATIVE IMPACTS TO THE EXISTING AND FUTURE
 TRANSPORTATION NETWORK. A METHODOLOGY MEETING WITH THE
 CITY IS STRONGLY RECOMMENDED
 3) NOT SATISFIED. DEPENDING ON THE OUTCOME OF THE
 TRAFFIC ANALYSIS, TDM MEASURES MAY NEED TO BE
 NEGOTIATED AND ESTABLISHED. THE FACT THAT THE PROJECT
 IS TRANSIT ORIENTED DOES NOT MEAN THAT IT IS PRECLUDED
 FROM IMPLEMENTING MITIGATION MEASUREMENTS. NEGATIVE
 IMPACTS FROM THE RESIDENTIAL AND/OR COMMERCIAL
 COMPONENTS OF THE PROPOSED DEVELOPMENT DO NOT GET A
 FREE PASS BY BEING PART OF A TRANSIT PROJECT. EVEN IF
 THE OVERALL NUMBER OF TRIPS GENERATED BY THE PROPOSED
 DEVELOPMENT ARE FEWER THAN THE ORIGINAL APPLICATION,
 THE ORIGINAL TRAFFIC COUNTS ARE SIGNIFICANTLY OUTDATED,
 AS THEY WERE PERFORMED MORE THAN 10 YEARS AGO.
 MOREOVER, THE SHIFT IN LAND USE BETWEEN COMMERCIAL AND
 RESIDENTIAL, THE CHANGE OF BOTH INTERNAL AND EXTERNAL
 ROAD GEOMETRIES, AND THE CHANGE OF EXISTING AND ASSUMED
 BACKGROUND VOLUMES COULD BRING A NEW SET OF SIGNIFICANT
 NEGATIVE IMPACTS, WHICH CANNOT BE IDENTIFIED NOR
 ADDRESSED TILL A REVISED TRAFFIC STUDY IS PROVIDED
 4) SATISFIED. PROVIDE COUNTY TPS LETTER
 5) SATISFIED. PROVIDE DETAILS PERTAINING THE TRANSITION
 FROM EXISTING TO FUTURE TRANSIT SERVICES, IN TERMS OF
 LOGISTICS AND OPERATIONS. COMMENT WILL BE SATISFIED
 ONCE DETAILS FROM PBC ARE PROVIDED.
  
 SITE PLAN COMMENTS
 6) NOT SATISFIED. PROVIDE A SEPARATE SITE PLAN
 SHOWCASING ONLY BASIC TRANSPORTATION FEATURES AND THEIR
 DIMENSIONS. SPECIFICALLY: SIDEWALK, CURB, PARKING
 STALLS, CROSSINGS, WALKWAY, ROADWAY, DRIVE ISLES,
 DRIVEWAYS, PAVEMENT MARKINGS, SIGNAGE. C-10 AND C-11
 ARE NOT PROPER, AS THEY ARE MISSING MOST OF THE
 DIMENSIONS AND MEASUREMENTS. PLEASE NAME THE
 TRANSPORTATION SITE PLANS T-01, T-02 AND HAVE THEM
 SEPARATE FROM ANY OTHER SET OF SITE PLANS (I.E. CIVIL,
 ARCHITECTURE, LANDSCAPE)
 7) PARTIALLY SATISFIED. ON THE SITE PLAN, PLEASE
 SHOWCASE BASIC CURB DETAILS (I.E. DRIVEWAY AND PARKING
 STALLS) ON THE OPPOSITE SIDE OF THE ROADS SURROUNDING
 THE PROPOSED DEVELOPMENT. PLEASE PROVIDE DOCUMENT NAME
 AND SHEET NUMBER SHOWCASING SUCH FEATURES. THE
 APPLICANT MUST PROVIDE THE REQUESTED
 TRANSPORTATION-SPECIFIC-PLANS SO THAT THE REVIEWER CAN
 PROPERLY ANALYZE THE TRAFFIC AND TRANSPORTATION
 COMPONENT OF THE PROPOSED DEVELOPMENT. THANK YOU.
 PLEASE APPLY SUCH CRITERIA TO THE T-SERIES
 TRANSPORTATION PLANS
 8) PARTIALLY SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR
 GARBAGE TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND
 OUT OF THE PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC
 ENVELOPES CLEARLY DEFINED. ANALYSIS SHOULD BE PROVIDED
 IN A SEPARATE FILE/DRAWING. PLEASE PROVIDE DOCUMENT
 NAME AND SHEET NUMBER SHOWCASING THE ANALYSIS. LATEST
 RESPONSE DID NOT PROVIDE FILE NAME AND SHEET NUMBER,
 PLEASE BE SPECIFIC. LATEST ANALYSIS DOES NOT SHOW THE
 WHEEL PATHS AND THERE ARE INSTANCES OF PARTIAL
 ENCROACHMENTS. USE DIFFERENT COLORS FOR VEHICLE DYNAMIC
 ENVELOPE AND WHEEL PATHS. CITY CAN PROVIDE SAMPLES OF
 PROPER ANALYSIS IF NEEDED/REQUESTED
 9) SATISFIED. SEVERAL ADA PARKING STALLS IN THE GARAGE
 MUST BE RELOCATED TO THE NEAREST ACCESS TO RESIDENTIAL
 UNIT AND ELEVATORS, SPECIFICALLY: 10, 11, 33, 34, 63,
 64
 10) PARTIALLY SATISFIED. REDUCE GARAGE RAMPS TO ONE
 SINGLE LANE, INSTALL CHEVRON MARKINGS ON THE SIDE OF
 THE RAMP FOR SUCH REDUCTION. IF TWO LANES ARE KEPT, A
 CONTINUOUS DIVIDING ELEMENT MUST BE INSTALLED (I.E.
 RAISED CURB WITH FLEXIBLE POLES). PROVIDE A TRAFFIC OR
 QUEUING ANALYSIS TO PROVE THAT DOUBLE ENTRY LANES ARE
 NECESSARY TO AVOID VEHICULAR SPILLBACK INTO CLEARWATER.
 PROVIDE THE CODE REFERENCE REQUIRING ?AMPLE? STACKING
 OF EXISTING VEHICLES WITHIN THE SITE.
 11) SATISFIED. PLEASE PROVIDE A CONTACT PERSON THAT
 WOULD RECEIVE MARKED UP SITE PLANS. THERE ARE SEVERAL
 COMMENTS FOR THE PROPOSED DROP-OFF DESIGN THAT WOULD BE
 BETTER CONVENED WITH SITE PLAN MARK-UPS THAN COMMENTS
 HERE
 12) NOT SATISFIED. THE BANYAN STREETSCAPE IMPROVEMENTS
 PROJECT DOES NOT ALLOW LEFT TURNS FROM CLEARWATER TO
 BANYAN. PLEASE UPDATE THE SITE PLANS ACCORDINGLY. A
 LEFT-TURN APPROVAL DOES NOT MEAN THAT IT MUST BE
 IMPLEMENTED. THUS, IT IS RECOMMENDED TO REDUCE THE
 NORTHBOUND LANES TO A SINGLE ONE AT THE INTERSECTION OF
 CLEARWATER AND BANYAN. MOREOVER, IT IS SUGGESTED TO
 CONVERT THE CURRENT PROPOSED NORTHBOUND RIGHT-MOST LANE
 ON CLEARWATER DR TO A MERGE/ACCELERATION ONE.
 13) NOT SATISFIED. PEDESTRIAN CROSSINGS ON CLEARWATER
 MUST BE HIGH EMPHASIS ONES WITH INSTALLATION OF
 RECTANGULAR RAPID FLASHING BEACONS. STOP BARS AND
 SIGNAGE MUST BE REPLACED/REALLOCATED ACCORDINGLY. THE
 OPERATION WITHIN THE ITC ARE WITHIN COUNTY?S CONTROL.
 HOWEVER, CLEARWATER DR IS OUTSIDE OF THE ITC AND A CITY
 ROAD; THUS, COUNTY HAS NO CONTROL. MOREOVER, STOP BARS
 IN THE VICINITY OF THE PEDESTRIAN CROSSINGS WERE
 ALREADY PROPOSED BY THE DEVELOPER AND DEPICTED IN PRIOR
 SITE PLAN SUBMITTALS
 14) PROVIDE A SUMMARY TABLE CAPTURING THE NUMBER OF
 METERED PARKING REMOVED OR RELOCATED. COORDINATE WITH
 PARKING DEPARTMENT PERTAINING SUCH REMOVAL AND
 RELOCATION
 15) REMOVE THE STOP BARS ALONG CLEARWATER DR BY THE
 GARAGE ENTRANCE OR PROVIDE A TRAFFIC ANALYSIS
 WARRANTING THEIR IMPLEMENTATION
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 2 Status F Date 07-08-2022 Cont ID  
Sent By   Date 07-08-2022 Time   Rev Time 0.00
Received By   Date 07-08-2022 Time   Sent To  
Notes
2022-07-08 17:28:29TRAFFIC COMMENTS
 1) NOT SATISFIED. PROVIDE ORIGINAL TRAFFIC STUDY
 INCLUSIVE OF THE REFERENCED EXHIBIT D. PLEASE PROVIDE
 FILE NAME, AS IT WAS NOT FOUND IN THE LATEST SUBMISSION
 2) NOT SATISFIED. CONDUCT A FULL DETAILED TRAFFIC
 STUDY. ROADWAYS GEOMETRY AND NEARBY TRAFFIC CONDITIONS
 HAVE CHANGED SIGNIFICANTLY SINCE THE INITIAL SITE PLANS
 APPROVAL. REASONING PROVIDED FOR NOT CONDUCTING A NEW
 STUDY DO NOT SUBSIST; AS THERE IS NO FAILURE FROM THE
 CITY, NOR THE DEVELOPER. MOREOVER, VESTED TRIPS DO NOT
 HAVE ANY MEANING ON THIS REQUEST.
 3) NOT SATISFIED. DEPENDING ON THE OUTCOME OF THE
 TRAFFIC ANALYSIS, TDM MEASURES MAY NEED TO BE
 NEGOTIATED AND ESTABLISHED. THE FACT THAT THE PROJECT
 IS TRANSIT ORIENTED DOES NOT MEAN THAT IT IS PRECLUDED
 FROM IMPLEMENTING MITIGATION MEASUREMENTS. NEGATIVE
 IMPACTS FROM THE RESIDENTIAL AND/OR COMMERCIAL
 COMPONENTS OF THE PROPOSED DEVELOPMENT DO NOT GET A
 FREE PASS BY BEING PART OF A TRANSIT PROJECT.
 4) SATISFIED. PROVIDE COUNTY TPS LETTER
 5) PARTIALLY SATISFIED. PROVIDE DETAILS PERTAINING THE
 TRANSITION FROM EXISTING TO FUTURE TRANSIT SERVICES, IN
 TERMS OF LOGISTICS AND OPERATIONS. COMMENT WILL BE
 SATISFIED ONCE DETAILS FROM PBC ARE PROVIDED.
  
 SITE COMMENTS
 6) NOT SATISFIED. PROVIDE A SEPARATE SITE PLAN
 SHOWCASING ONLY BASIC TRANSPORTATION FEATURES AND THEIR
 DIMENSIONS. SPECIFICALLY: SIDEWALK, CURB, PARKING
 STALLS, CROSSINGS, WALKWAY, ROADWAY, DRIVE ISLES,
 DRIVEWAYS, PAVEMENT MARKINGS, SIGNAGE. C-10 AND C-11
 ARE NOT PROPER, AS THEY ARE MISSING MOST OF THE
 DIMENSIONS AND MEASUREMENTS.
 7) NOT SATISFIED. ON THE SITE PLAN, PLEASE SHOWCASE
 BASIC CURB DETAILS (I.E. DRIVEWAY AND PARKING STALLS)
 ON THE OPPOSITE SIDE OF THE ROADS SURROUNDING THE
 PROPOSED DEVELOPMENT. PLEASE PROVIDE DOCUMENT NAME AND
 SHEET NUMBER SHOWCASING SUCH FEATURES. THE APPLICANT
 MUST PROVIDE THE REQUESTED
 TRANSPORTATION-SPECIFIC-PLANS SO THAT THE REVIEWER CAN
 PROPERLY ANALYZE THE TRAFFIC AND TRANSPORTATION
 COMPONENT OF THE PROPOSED DEVELOPMENT. THANK YOU.
 8) NOT SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE
 TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND OUT OF THE
 PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES
 CLEARLY DEFINED. ANALYSIS SHOULD BE PROVIDED IN A
 SEPARATE FILE/DRAWING. PLEASE PROVIDE DOCUMENT NAME AND
 SHEET NUMBER SHOWCASING THE ANALYSIS. LATEST RESPONSE
 DID NOT PROVIDE FILE NAME AND SHEET NUMBER, PLEASE BE
 SPECIFIC.
 9) SEVERAL ADA PARKING STALLS IN THE GARAGE MUST BE
 RELOCATED TO THE NEAREST ACCESS TO RESIDENTIAL UNIT AND
 ELEVATORS, SPECIFICALLY: 10, 11, 33, 34, 63, 64
 10) REDUCE GARAGE RAMPS TO ONE SINGLE LANE, INSTALL
 CHEVRON MARKINGS ON THE SIDE OF THE RAMP FOR SUCH
 REDUCTION. IF TWO LANES ARE KEPT, A CONTINUOUS DIVIDING
 ELEMENT MUST BE INSTALLED (I.E. RAISED CURB WITH
 FLEXIBLE POLES)
 11) PLEASE PROVIDE A CONTACT PERSON THAT WOULD RECEIVE
 MARKED UP SITE PLANS. THERE ARE SEVERAL COMMENTS FOR
 THE PROPOSED DROP-OFF DESIGN THAT WOULD BE BETTER
 CONVENED WITH SITE PLAN MARK-UPS THAN COMMENTS HERE
 12) THE BANYAN STREETSCAPE PROJECT DOES NOT ALLOW LEFT
 TURNS FROM CLEARWATER TO BANYAN. PLEASE UPDATE THE SITE
 PLANS ACCORDINGLY
 13) PEDESTRIAN CROSSINGS ON CLEARWATER MUST BE HIGH
 EMPHASIS ONES WITH INSTALLATION OF RECTANGULAR RAPID
 FLASHING BEACONS. STOP BARS AND SIGNAGE MUST BE
 RE-PLACED ACCORDINGLY
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status F Date 05-10-2022 Cont ID  
Sent By   Date 05-10-2022 Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
2022-05-10 11:21:47TRAFFIC COMMENTS
 1) PROVIDE ORIGINAL TRAFFIC STUDY INCLUSIVE OF THE
 REFERENCED EXHIBIT D
 2) CONDUCT A FULL DETAILED TRAFFIC STUDY. ROADWAYS
 GEOMETRY AND NEARBY TRAFFIC CONDITIONS HAVE CHANGED
 SIGNIFICANTLY SINCE THE INITIAL SITE PLANS APPROVAL
 3) DEPENDING ON THE OUTCOME OF THE TRAFFIC ANALYSIS,
 TDM MEASURES MAY NEED TO BE NEGOTIATED AND ESTABLISHED
 4) PROVIDE COUNTY TPS LETTER
 5) PROVIDE DETAILS PERTAINING THE TRANSITION FROM
 EXISTING TO FUTURE TRANSIT SERVICES, IN TERMS OF
 LOGISTICS AND OPERATIONS
  
 SITE COMMENTS
 6) PROVIDE A SEPARATE SITE PLAN SHOWCASING ONLY BASIC
 TRANSPORTATION FEATURES AND THEIR DIMENSIONS.
 SPECIFICALLY: SIDEWALK, CURB, PARKING STALLS,
 CROSSINGS, WALKWAY, ROADWAY, DRIVE ISLES, DRIVEWAYS,
 PAVEMENT MARKINGS, SIGNAGE
 7) ON THE SITE PLAN, PLEASE SHOWCASE BASIC CURB DETAILS
 (I.E. DRIVEWAY AND PARKING STALLS) ON THE OPPOSITE SIDE
 OF THE ROADS SURROUNDING THE PROPOSED DEVELOPMENT.
 PLEASE PROVIDE DOCUMENT NAME AND SHEET NUMBER
 SHOWCASING SUCH FEATURES.
 8) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND/OR
 SERVICE VEHICLES DRIVING IN AND OUT OF THE PROPOSED
 DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES CLEARLY
 DEFINED. ANALYSIS SHOULD BE PROVIDED IN A SEPARATE
 FILE/DRAWING. PLEASE PROVIDE DOCUMENT NAME AND SHEET
 NUMBER SHOWCASING THE ANALYSIS.
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop X PERMIT EXTENSION
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 4 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By ckimmerl Date 12-20-2022 Time 13:11 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status F Date 08-19-2022 Cont ID  
Sent By ckimmerl Date 08-19-2022 Time 09:03 Rev Time 0.00
Received By ckimmerl Date 08-19-2022 Time 09:02 Sent To  
Notes
2022-08-19 09:03:01PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN WRITTEN
 FORMAT. [ACKNOWLEDGED]
  
 THANK YOU FOR THE EXCEL DOCUMENT FOR THE RESPONSES,
 PLEASE PROVIDE DIRECT RESPONSES ON RESUBMITTALS WITHIN
 A WORD OR SIMILAR FORMAT. (DISPLAY THE QUESTION ASKED
 BY REVIEWERS AND THE ANSWER/RESPONSE FROM APPLICANTS)
  
 WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF THREE
 (3) PAPER COPIES AND AN ELECTRONIC COPY IN .PNG AND PDF
 FORMAT OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS
 TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL
 COMMENT. [ACKNOWLEDGED]
  
 THE PPRC COMMENTS SHALL BE SUFFICIENTLY ADDRESSED AND
 SUBMITTED TO THE PLANNING DIVISION BY 5 PM ON FRIDAY
 05/27 /22, TO BE ELIGIBLE TO BE SCHEDULED FOR THE
 7/13/22 DOWNTOWN ACTION COMMITTEE MEETING. [COVID
 DELAYS NOT CAUSED BY APPLICANT]
  
 PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT
 RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS
 FROM THE DATE OF THE PPRC MEETING (BY AUGUST 12, 2022),
 THE PLANNING DIVISION MAY NOTIFY THE APPLICANT THAT THE
 CASE IS CONSIDERED WITHDRAWN. ANY FURTHER ACTION SHALL
 REQUIRE A NEW DEVELOPMENT APPLICATION. [ACKNOWLEDGED]
  
 PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($500).
 [ACKNOWLEDGED]
  
 1. THIS PROPOSED PROJECT IS SIGNIFICANTLY DIFFERENT
 THAN THE CURRENTLY APPROVED SITE PLAN; THEREFORE, IT IS
 NOT A MODIFICATION TO THE EXISTING APPROVED SITE PLAN
 AS STATED IN THE JUSTIFICATION STATEMENT, BUT RATHER A
 NEW SITE PLAN APPROVAL. THE PREVIOUSLY APPROVED SITE
 PLAN AND THE VARIANCES THAT WERE GRANTED DO NOT
 AUTOMATICALLY APPLY TO THE NEW SITE PLAN. ANY VARIANCES
 THAT ARE REQUIRED BASED ON THE NEW BUILDING DESIGN AND
 SITE LAYOUT REQUIRE APPROVAL BY THE DOWNTOWN ACTION
 COMMITTEE THROUGH THE VARIANCE PROCESS. [THE CURRENT
 SITE PLAN IS APPROVED AND VESTED BY MULTIPLE APPROVALS
 PROVIDED BY WPB AND PBC PURSUANT TO THE PSA. THESE
 VESTED ITC AND GROUND LEVEL FEATURES THAT ARE OR CAN BE
 LEGALLY BUILT TODAY ARE INTENDED TO BE CARRIED FORWARD
 IN THE NEW APPROVAL AND WE HAVE BEEN ASSURED BY
 ADMINISTRATION THAT THE CITY WILL RECOGNIZE THESE
 VESTED FEATURE AND WILL BE WORKING WITH THE APPLICANT
 TO CARRY THEM FORWARD IN THE NEW SITE PLAN APPROVAL
 BEING SOUGHT THAT WILL EVENTUALLY REPLACE AND SUPERSEDE
 HE EXISTING VESTED APPROVAL WITH A NEW APPROVAL THAT
 REAFFIRMS THESE PREVIOUSLY APPROVED SITE CONDITIONS.]
 PLEASE NOTE, THERE ARE NO VESTED OR CARRIED OVER
 APPROVALS FOR THIS PROJECT, BEYOND THE ORIENTATION OF
 THE ITC/SFRTA FACILITIES, THE BUS/TRAIN OPERATIONS, AND
 THE REQUIREMENTS WITHIN THE COUNTY PSA FOR RESERVED ITC
 AND SFRTA PARKING SPACES. THE REST OF SITE, PROPOSED
 STRUCTURES, CIRCULATION, ETC. WILL BE REVIEWED AND
 TREATED AS A NEW SITE PLAN SUBMITTAL. ANY PREVIOUSLY
 OBTAINED VARIANCES, WAIVERS, AND APPROVALS FROM
 DAC/STAFF MUST BE REACQUIRED/ APPLIED FOR, AS THE
 OVERALL SITE CONDITIONS AND PLANS HAVE CHANGED
 SIGNIFICANTLY FROM THE PREVIOUSLY APPROVED PLANS FOR
 THIS PROPERTY.
  
 TV JULY 19TH RESPONSE: TV HAS AGREED TO PROCEED TO
 RESPONSIVELY RESPOND TO THESE PPRC COMMENTS WITHOUT
 WAIVING ANY RIGHTS THAT IT MAY HAVE.
 ZONING 8.19 - [ACKNOWLEDGED]
  
 2. STAFF HAS NOTED THAT THE PROPOSED SITE PLAN,
 INCLUDING THE USE MIX, DIFFERS FROM THE AGREEMENT FOR
 PURCHASE AND SALE DATED AUGUST 12, 2012. SINCE THE
 AGREEMENT FOR PURCHASE AND SALE ESTABLISHES THAT
 MODIFICATIONS ARE PERMITTED, SUBJECT TO PALM BEACH
 COUNTY APPROVAL, PLEASE PROVIDE THE LATEST AMENDMENT OR
 VERSION OF THE AGREEMENT FOR PURCHASE AND SALE THAT
 AUTHORIZES THE CHANGES PRESENTED IN THE CURRENT
 SUBMITTAL, INCLUDING, BUT NOT LIMITED TO: [COPIES OF
 THE PSA AND ALL AMENDMENT PROVIDED. A COPY OF PBC
 WRITTEN CONSENT TO THE SUBMITTED PLAN PACKAGE WAS
 PROVIDED PURSUANT TO THE PSA AND COPIES OF ALL
 AGREEMENTS HAVE ALSO BEEN PROVIDED] [SATISFIED] THANK
 YOU FOR PROVIDING PSA DOCUMENTATION AND ADDITIONAL
 AMENDMENTS/ AGREEMENTS.
  
 A. THE REDUCTION IN THE REQUIRED 40 PARKING SPACES FOR
 SFTRA / COUNTY STAFF AND 250 SFRTA PATRON PARKING
 SPACES TOTAL 290 PARKING SPACES) TO 275 PARKING SPACES
 FOR THESE USERS.
 [THIS STATEMENT IS INCORRECT. THE MODIFIED PSA REQUIRES
 25 SPACES TO THE COUNTY WHICH IS WHAT IS PROVIDED]
 [SATISFIED] THANK YOU FOR PROVIDING THE NECESSARY PSA
 DOCUMENTATION WITH AMENDMENTS. THE LATEST AMENDMENT TO
 PSA (EXHIBIT 2) THAT WAS PROVIDED WITH RESUBMITIAL
 STATES: 250 PARKING SPACES FOR TRI-RAIL, AND 25 SPACES
 FPOR THE COUNTY
  
 B. THE REMOVAL OF LEARNING CENTER/CULTURAL/EDUCATION
 USES FROM THE PROJECT. [THIS USE WAS VOLUNTARY AND IS
 NOT A REQUIREMENT OF ANY APPROVAL] [NOT SATISFIED]
 SECTION 2.3.2 OF PSA (PG.14) STATES:
 THE SITE PLAN WILL INCLUDE, BUT NOT BE LIMITED TO,
 CIVIC USE (LEARNING CENTER/CULTURAL CENTER/EDUCATION),
 COMMERCIAL/OFFICE, HOTEL ROOMS, RESIDENTIAL UNITS
 (STUDENT /WORKFORCE/MARKET) INCLUDING WORKFORCE AND/OR
 AFFORDABLE UNITS? LUXURY RENTAL UNITS AND AMENITY
 RETAIL. IT APPEARS TO BE A REQUIREMENT OF THE PSA, HAS
 THIS BEEN AMENDED? IF SO PLEASE PROVIDE SPECIFIC
 DOCUMENT OR OUTLINE LOCATION, SO STAFF CAN VERIFY.
  
 TV JULY 19TH RESPONSE: ALTHOUGH ANY ISSUE WITHIN THE
 PSA IS BETWEEN BUYER AND SELLER, THE TERMS OF THE PSA
 HAVE BEEN MET. THE PSA ALLOWS FOR A CHANGE IN USES AS
 DETERMINED BY TV (PLEASE SEE SPECIFICALLY SECTION 2.3.2
 OF THE PSA).
  
 FURTHER, AMENDMENTS ARE ALSO PERMITTED IF APPROVED BY
 THE COUNTY DURING ITS SITE PLAN REVIEW PROCESS.
  
 IN FURTHERANCE OF THIS, THE AMENDED SITE PLAN THAT HAS
 BEEN APPROVED BY PALM BEACH COUNTY AND THEIR EXPLICIT
 CONSENT HAS BEEN PREVIOUSLY PROVIDED.
  
 NEVERTHELESS, TV WISHES TO POINT OUT THAT THE AMENDED
 SITE PLAN CONTINUES TO PROVIDE CIVIC USES INCLUDING,
 BUT NOT LIMITED TO, THE PLAZA AND CONNECTION FROM THE
 PROJECT TO THE TRI-RAIL CROSSOVER AND THE TRI-RAIL
 PARKING.
  
 SEE ATTACHED EMAIL (?MCCLELLAN EMAIL?) DATED JULY 13,
 2022 FROM ERIC MCCLELLAN FROM THE COUNTY CONFIRMING
 TV?S COMPLIANCE WITH THE PSA AND SPECIFICALLY THE
 AMENDED SITE PLAN.
 [SATISFIED]
  
 C. THE JUSTIFICATION STATEMENT SITE DATA TABLE LISTS 42
 WORKFORCE HOUSING UNITS AS BEING REQUIRED, WHILE THE
 AGREEMENT FOR PURCHASE AND SALE ONLY REQUIRES 38. THE
 PLANS DO NOT PROVIDE A BREAKDOWN TO VERIFY COMPLIANCE
 WITH EITHER NUMBER. [THE 42 WORKFORCE HOUSING UNITS
 REQUIRED BY THE PSA ARE SHOWN IN THE SITE PLAN TABULAR.
 THEIR FINAL LOCATION HAS NOT YET BEEN DETERMINED,
 HOWEVER THE APPLICANT INTENDS TO PROVIDE THEM IN A
 MANNER SO AS TO NOT CLUSTER OR CONCENTRATE THEM IN ANY
 ONE LOCATION. THE PSA REQUIRES THEM TO BE ON SITE AND
 COMPLY WITH THE COUNTY HOUSING PROGRAM. THE APPLICANT
 WILL CONTINUE TO WORK WITH WPB AND PBC ON THE TERMS OF
 THE WFH UNITS.]
 [PARTIALLY SATISFIED] THANK YOU FOR PROVIDING THE
 NECESSARY DOCUMENTATION FOR THE LATEST AMENDMENT TO PSA
 (5C-5). THIS SHEET (5C-5) INCLUDES ADDITIONAL (4)
 WORKFORCE UNITS. ?- DO NOT SEE THESE WFH UNITS CALLED
 OUT OR MENTIONED IN DATA TABLES OR SITE PLAN.
  
 TV JULY 19TH RESPONSE: 42 WFH UNITS REQUIRED BY PSA ARE
 SHOWN IN TABULAR FORMAT ON SHEET A0-02. THE LOCATION TO
 BE DETERMINED AT A LATER TIME. WE WILL PROVIDE EVIDENCE
 OF COMPLIANCE WITH THIS PROVISION WHEN PROVIDED TO THE
 COUNTY UNDER THE PSA. THIS IS NOT A CITY REQUIREMENT.
  
 SEE MCCLELLAN EMAIL.
 ZONING 8.19 - [SATISFIED]
  
 D. SECTION 3E OF EXHIBIT D TRAFFIC CIRCULATION PLAN OF
 THE AGREEMENT FOR PURCHASE AND SALE LIMITS THE NUMBER
 OF PARKING SPACES WITHIN THE PARKING GARAGE TO THE 290
 PUBLIC USE PARKING SPACES AND, PROVIDE NOT MORE THAN
 THE NUMBER OF PARKING SPACES REQUIRED BY THE CITY OF
 WEST PALM BEACH FOR THE MIX OF USES AND INTENSITIES /
 DENSITIES AS ACTUALLY CONSTRUCTED. AS WILL BE SHOWN
 LATER IN THESE COMMENTS, THE PROJECT EXCEEDS THIS
 STANDARD. [THESE SPACES ARE INTENDED TO SERVE THE
 TRANSIT USES REQUIRED TO BE PROVIDED TO THESES
 GOVERNMENTAL PROVIDERS. THESE PARKING SPACES ARE
 INCLUSIVE TO THE MINIMUM PARKING REQUIRED FOR THE
 PROJECT AND ARE NOT IN EXCESS OF THE MAXIMUM PARKING
 PERMITIED ON SITE. THE GARAGE COMPONENT IS BEING BUILT
 TO SERVE THE ENTIRE PROJECT AND THE PSA REQUIRES
 CONTINUOUS C[O]NSTRTUCTION OF THE PROJECT UNTIL IT IS
 COMPLETED.] [PARTIALLY STATISFIED] THANK YOU FOR
 PROVIDING THE NECESSARY DOCUMENTATION ON THE PSA AND
 ITS AMENDMENTS, IN ADDITION TO THE PARKING BREAKDOWN;
 BASED UPON THIS: THE HOTEL ROOM/ AMENITY, RESINDENTIAL,
 RETAIL, OFFICE, GUEST AND SFRTA / COUNTY PARK[G]ING
 SPACES CHECKOUT WITH THE REQUIRED MINIMUMS AND 25% TOD
 REDUCTION.
  
 - CLARIFICATION, TABLE IV-9: MICRO-UNITS MINIMUM
 PARKING REQUIREMENT IS ZERO, NOT 1/13 UNITS. ONLY
 CF.\R?SHARE HAS 1/13 REQUIREMENT.
 - PLEASE MAKE CLEAR FROM THE TABLE PROVIDED, ARE YOU
 PROVIDING. ONLY 13 CAR-SHARE SPACES FOR -MICRO-UNITS?
 OR ARE YOU ARE PROVIDING 13 SPACES FOR MICRO-UNITS AND
 THEN ADDITIONAL 13 CAR-SHARE SPACES (26 TOTAL)? THE
 CAR-SHARE SPACES WOULD BE INDEPENDENT FROM OTHER
 PARKING AND DESIGNATED/RESERVED AS SUCH.
 - PER SECTION 94-106 (8.A) A PROJECT WITH RESIDENTIAL
 MICRO-UNITS SHALL PROVIDE ON-SITE CAR-SHARE STATIONS ON
 A RATIO OF ONE PER EVERY 13 UNITS. THE TOTAL AMOUNT OF
 CAR-SHARE STATIONS MAY BE REDUCED BY ONE CAR-SHARE
 STATION PER EVERY 13 ON-SITE PARKING SPACES PROVIDED.
 THE TOTAL NUMBER OF CAR-SHARE STATIONS MAY BE ADJUSTED
 BASED ON CURRENT SYSTEM DEMANDS, BUT A MINIMUM OF ONE
 CAR-SHARE STATION SHALL BE PROVIDED. THE REMAINDER OF
 THE SPACES SHALL BE RESERVED FOR FUTURE SERVICE
 EXPANSION.
  
 TV JULY 19TH RESPONSE: MICRO UNITS ARE PROPOSED TO BE
 PARKED TO CODE WITH 0 SPACES PER UNIT, 13 SHARED CAR
 SPACES, AND 8 GUEST SPACES WITH 83 BIKE SPACES. TABULAR
 DATA ON SHEET A0-02 HAS BEEN UPDATED TO REFLECT THE
 PARKING RESERVATION FOR MICRO USES.
 ZONING 8.19 - [SATISFIED]
  
 3. THE SITE CURRENTLY CONSISTS OF A PBC PARCEL AND A
 SFTRA PARCEL. THANK YOU FOR PROVIDING AMENDMENT 3 AND
 2021 EXTENSTION TO AUG 2024, WHICH MENTIONED THAT THE
 SFRTA BE UNDER CONDOMINIUM OWNERSHIP RATHER THAN
 SEPARATE SPACES TO BE A CONDOMINUM. THIS INDICATES THAT
 THE PROJECT WILL PARCELS. IF THE AGREEMENT IS AMENDED
 AND THERE WILL BE FEE SIMPLE PARCELS, THOSE PARCEL
 LINES NEED TO BE SHOWN / INDICATED NOW, SO THAT STAFF
 CAN VERIFY THAT THERE ARE NO BUILDING SEPARATATION OR
 SETBACK ISSUES THAT DO NOT COMPLY WITH BUILDING,ZONING,
 OR FIRE CODE, AND IF ANY VARIANCES ARE NEEDED AS PART
 OF THE APPROVAL.
  
 TV JULY 19TH RESPONSE: TV NOTES THAT THE PERFORMANCE OF
 THIS AGREEMENT BY SFRTA IS NOT BEFORE THE PHYSICAL
 COMPLETION OF THE SFRTA/TRI-RAIL PARKING SPACES AND
 THAT THE SFRTA AGREEMENT IS STILL PRINCIPALLY EXECUTORY
 AS IT HAS NOT BEEN FULLY PERFORMED BY THE SFRTA AT THIS
 TIME.
  
 TV?S HAS NO CURRENT INTENT TO HAVE SEPARATELY OWNED
 LAND PARCELS AND THAT AN EASEMENT OR OTHER
 AGREEMENT/INSTRUMENT WILL BE UTILIZED TO RESERVE THE
 SFRTA/TRI-RAIL PARKING.
 ZONING 8.19 - [ACKNOWLEDGED]
 E. THE DECKS, COLUMNS AND A PORTION OF THE RETAIL
 BUILDING ON THE SOUTH END OF THE SECOND FLOOR CROSS
 THIS PARCEL LINE, WHICH CREATE SETBACK AND BUILDING
 SEPARATION ISSUES THAT NEED TO BE ADDRESSED.
 [CONFIRMED] [NOT SATISFIED] SEE COMMENT ABOVE.
  
 TV JULY 19TH RESPONSE: THE GREEN/BLUE COLORS ON SHEET
 A0-03 WERE FIRST AGREED UPON IN 2012 IN CONNECTION WITH
 THE EXECUTION OF THE PSA AND WERE CONCEPTUAL AT THAT
 TIME AS TO THE FINAL PROPERTY LINES. ACCORDINGLY, THE
 PSA REQUIRES TV TO PREPARE THE METES AND BOUNDS OF THE
 TITLE TO BE CONVEYED AND PROVIDES FOR THE ADJUSTMENT OF
 THE PROPERTY LINES, IN ACCORDANCE WITH THE COUNTY?S
 APPROVAL OF THE AMENDED SITE PLAN. THE COUNTY HAS
 APPROVED THE AMENDED SITE PLAN AND TRANSIT VILLAGE WILL
 OBTAIN FEE SIMPLE TO THIS PROPERTY. SEE MCCLELLAN EMAIL
 . SEE ALSO SECTION 5.9 AND EXHIBIT A TO THE PSA WHICH
 PROVIDE FOR THE ADJUSTMENT OF THE PROPERTY LINES.
 ZONING 8.19 - [ACKNOWLEDGED]
  
 F. THE AGREEMENT FOR PURCHASE AND SALE INDICATES THAT
 PALM BEACH COUNTY WILL RETAIN OWNERSHIP OF THE
 INTERMODAL TRANSIT CENTER TO A POINT 21 FEET IN THE
 AIR. THE APPLICATION DOES NOT MENTION HOW THIS PROPOSED
 SUBDIVISION WILL OCCUR. [THESE PROPERTY LINES WILL BE
 ADDRESSED AS PART OF THE SUBDIVISION PROCESS OR BY
 AGREEMENT]
 [NOT SATISFIED] SEE COMMENTS ABOVE.
  
 TV JULY 19TH RESPONSE: THIS MAY BE ACHIEVED WITH A
 VERTICAL SUBDIVISION OR AN AIR RIGHT EASEMENT OR OTHER
 LEGAL INSTRUMENT TO BE DETERMINED LATER WITH
 COORDINATION WITH STAFF AND THE COUNTY. THERE IS NO
 NEED FOR RESOLUTION OF OWNERSHIP STRUCTURE AT THIS TIME
 AS THE PSA CONTEMPLATES THE EQUITABLE DISCUSSION OF
 PERMANENTLY RELOCATING THE ITC WHICH DISCUSSIONS ARE
 ONGOING AND INCLUDE THE CITY AND CRA. FUTURE
 DISPOSITIONS WILL BE PURSUANT TO APPLICABLE LAW.
 ZONING 8.19 - [ACKNOWLEDGED]
  
 G. THE JUSTIFICATION STATEMENT INDICATES THAT THE
 AGREEMENT FOR PURCHASE AND SALE INCLUDES THE SFRTA, YET
 THEY ARE NOT SHOWN AS A PARTY TO STAFFS COPY OF THE
 AGREEMENT. WILL THE SFRTA RETAIN ANY OWNERSHIP AND IF
 SO, HOW WILL THE PARCEL BE SUBDIVIDED? [LEGAL
 SUBDIVISION PROCESS I.E. VERTICAL SUB DIVISION, WILL BE
 PURSUED] [SFRTA USES THE PARKING LOT PURSUANT TO AN
 EASMENT FROM THE COUNTY. THE APPLICANT HAS AN AGREEMENT
 WITH SFRTA TO PROVIDE EITHER FEE SIMPLE OR AN EASEMENT
 FOR ANY USE OF THE SFRTA PROPERTY BORDERING THE
 TRACKS.]
 [NOT SATISFIED] PLEASE PROVIDE COPY OF AGREEMENT.
  
 TV JULY 19TH RESPONSE: COPIES OF THE SFRTA AGREEMENTS
 HAVE BEEN FORWARDED TO THE CITY.
  
 ALSO PLEASE NOTE THAT THE SFRTA WAS A PARTNER IN THE
 RFP AND PARTICIPATED WITH THE CITY AND OTHERS IN THE
 RFP SELECTION PROCESS AND APPROVED THE PSA ALONG WITH
 THE CITY AND OTHERS.
  
 THERE IS ALSO A SEPARATE AGREEMENT WITH SFRTA FOR THE
 PURCHASE OF THE 250 TRI-RAIL PARKING SPACES AND WHICH
 ALSO PROVIDES FOR THE DEVELOPMENT UPON THE SFRTA
 PROPERTY BY TV. PLEASE NOTE THAT THE SFRTA HAS PROVIDED
 A CONSENT TO TV TO FILE THIS AMENDED SITE PLAN.
  
 THE AGREEMENT BETWEEN TV AND THE SFRTA ALSO CONTAINS
 PROVISIONS RELATING TO CERTAIN PROPERTY ALONG THE
 TRACKS AND THE ITC OWNED BY THE SFRTA. THE FEE
 OWNERSHIP OF THIS PROPERTY IS NOT BEING CHANGED AND THE
 SFRTA APPROVED THE AMENDED SITE PLAN AND THE AGREEMENTS
 PROVIDE FOR THE SFRTA TO EXECUTE AGREEMENTS/S/OR OTHER
 AGREEMENTS MEMORIALIZING THE PEDESTRIAN PATH FROM THE
 RAILROAD PLATFORM TO BANYAN, AND AS OTHERWISE REQUIRED
 AS PER THE AMENDED SITE PLAN (CONNECTING STAIRS,
 CONNECTING PEDESTRIAN BRIDGE, SUPPORT COLUMNS). COPIES
 OF THE TRANSIT VILLAGE-SFRTA AGREEMENTS HAS BEEN
 SEPARATELY PROVIDED.
 ZONING 8.19 - [ACKNOWLEDGED]
  
 4. TRANSIT VILLAGE BOUNDARY DIAGRAM SHEET A0-03
 DIFFERENT FROM THE ?ITC PROPERTY MAP? AND REQUIRED
 MODIFICATIONS FROM ORIGINAL APPROVAL IN OCT. 2011.
 CLEARLY SHOW THE ITC BOUNDARY ON THE GROUND LEVEL AND
 SECOND LEVEL OF THE VARIOUS PLANS. [THIS PLAN IS PART
 OF THE PSA AND THE BOUNDARIES HAVE BEEN ADJUSTED BY
 AMENDMENTS. THE CURRENT PLAN IS ACCURATE] [PARTIALLY
 SATISFIED] THANK YOU FOR PROVIDING AN ADJUSTED BOUNDARY
 MAP FOR THE PROJECT. BASED ON THIS NEW MAP, PLEASE
 CLARIFY, DOES THE ITC OWN THE GROUND-LEVEL PORTION OF
 THE HOTEL/OFFICE? THE BOUNDARY SHEET A0-03 SHOWS
 RETAIL, FCC, ELEVATORS/STAIRS AND MOTOR LOBBY WITHIN
 THE ITC PROPERTY BOUNDARY.
  
 TV JULY 19TH RESPONSE: REPEAT SEE ABOVE.
 ZONING 8.19 - [ACKNOWLEDGED]
  
 5. THERE ARE NUMEROUS UTILITY AND OTHER EASEMENTS SHOWN
 ON THE SURVEY. ALL OF THESE EASEMENTS MUST BE SHOWN ON
 THE SITE AND LANDSCAPE PLANS (GROUND LEVEL AND SECOND
 PROPOSED DEVELOPMENT. [PLANS REVISED TO REFLECT ALL
 EASEMENTS ON GROUND AND SECOND LEVELS.] [NOT SATISFIED]
 THANK YOU FOR PROVIDING REVISED SURVEY AND PLANS WITH
 EASEMENTS ILLUSTRATED. BASED UPON THESE SHEETS AND
 ITEMS:
  
 - RESUBMITTED SURVEY DOES NOT APPEAR TO BE ACCURATE,
 DOES NOT FULLY REFLECT NEW BANYAN STREETSCAPE
 CONDITIONS AND UPDATES. MISSING THE HARDENING DONE BY
 FPL TO THEIR TRANSMISSION LINES, THERE IS A NEW/LARGER
 POLE ON BANYAN. THE LINES FROM THIS POLE RUN THROUGH
 THE FUTURE BUILDING. TREE GRATES ON BANYAN SIDE NO
 LONGER EXIST. ROW INCLUDES BIKE PATH AND PEDESTRIAN
 SIDEWALK.
 - PROVIDED SURVEY SHOWS 20? OVERHEAD UTILITY LINE
 EASEMENT ALONG RAILROAD/EASTERN PORTION OF PROPERTY,
 NOT REFLECTED IN SITE PLANS. PLEASE PROVIDE FPL
 APPROVALS TO VACATE OR MODIFY THIS EASEMENT.
 - ARE THE FIBER OPTIC EASEMENT AND FPL EASEMENT, ON THE
 SOUTHERN END OF PROPERTY TO REMAIN OR ARE THEY TO BE
 MODIFIED/VACATED? PLEASE PROVIDE NECESSARY APPROVALS IF
 VACATING OR MODIFYING. THESE PORTIONS OF THE EASEMENTS
 LIKELY WON?T BE IMPACTED BY ANY DEVELOPMENT, BUT NOTE
 TREES/LANDSCAPING MAY CONFLICT.
 - PROVIDED SURVEY SHOWS 20? FIRE EMERGENCY ACCESS
 EASEMENT. THIS WILL HAVE TO BE MODIFIED TO ALIGN WITH
 THE PROPOSED EGRESS. PLEASE PROVIDE APPROVALS FROM FIRE
 DEPT. TO ALTER THIS.
 - PROVIDED SURVEY SHOWS A CROSS ACCESS EASEMENT ON THE
 EASTERN BOUNDARY AS PART OF THE ITC, IS THIS TO REMAIN?
  
 TV JULY 19TH RESPONSE: THE SURVEY HAS BEEN REVISED TO
 SHOW ALL EASEMENTS (SEE SHEETS C03 AND C20). TRANSIT
 VILLAGE HAS BEEN WORKING WITH FPL ON RELOCATION OF THE
 LINES, INCLUDING ANY LINES THAT MAY BE WITHIN ANY
 PROPOSED BUILDING AREA FOR WHICH NO EASEMENT HAS BEEN
 GRANTED.
 [ACKNOWLEDGED] HAS FPL GRANTED ANY APPROVALS OR
 PROVIDED WRITTEN CONSENT OR SUPPORT FOR THE VACATING OF
 EASEMENTS OR MODIFICATION OF POLE LOCATIONS? MANY OF
 THE EXISTING CONCRETE HARDENING POLES LIE WITHIN THE
 PROPOSED BUILDING?S AREA OR THE MODIFIED ITC LOOP.
 PLEASE PROVIDE FPL CONSENT TO THIS ITEM.
  
 THE FIBER OPTIC AND FPL EASEMENTS ON THE SOUTHERN END
 ARE EXPECTED TO REMAIN.
 ZONING 8.19 - [ACKNOWLEDGED]
  
 THE 20? FIRE EMERGENCY ACCESS EASEMENT IS WITHIN THE
 AREA SHOWN ON SHEETS A1-01 AND C-03 AND WILL CONTINUE
 TO ALIGN WITH THE PROPOSED INGRESS AND EGRESS. FIRE
 DEPARTMENT APPROVAL WILL BE OBTAINED PRIOR TO OBTAINING
 A BUILDING PERMIT. THE EASEMENT HAS NOT BEEN MODIFIED
 FROM THE PRIOR SITE PLAN APPROVAL. ZONING 8.19 -
 [ACKNOWLEDGED]
  
 THE SURVEY SHOWS A CROSS ACCESS EASEMENT ON THE EASTERN
 BOUNDARY AS PART OF THE ITC THAT IS TO REMAIN.
 ZONING 8.19 - [ACKNOWLEDGED]
  
  
 6. PLEASE DOCUMENT AND IDENTIFY ALL REQUESTED
 VARIANCES AND WAIVERS FOR THE PROPOSED SITE PLANS. [1)
 EXISTING ENTRANCE WIDTH VARIANCE EXISTING APPROVED
 CONDITION TO BE CARRIED FORWARD 2) SAME VARIANCE TO
 ALLOW THE PUBLIC OPEN SPACE TO BE PROVIDED AS A PUBLIC
 PLAZA ON LEVEL 2] [NOT SATISFIED] BASED UPON THE
 DOCUMENTATION PROVIDED WITHIN THIS RESUBMITTAL, THE
 PROJECT WILL REQUIRE/SEEK MORE THAN THE TWO PROPOSED
 VARIANCES. PLEASE ADDRESS ALL COMMENTS AND NOTE ANY
 DEVIATION FROM THE MINIMUM / MAXIMUM.
  - OPEN SPACES NEED ADJUSTMENT AND CLARIFICATION IN
 TYPOLOGY AND HOW REQUIREMENTS ARE MET, MAY CONSTITUTE
 ADDITIONAL VARIANCES.
  -PROPOSED PUBLIC OPEN SPACE ON 2ND FLOOR, REQUIRES
 APPROVAL FROM BOARD, WILL SEEK IN THE FORM OF A
 VARIANCE.
  - MAXIMUM FOOTPRINT LENGTH EXCEEDS 350 FT. FOR TOD-25
 WOULD REQUIRE VARIANCE.
 - THE NUMBER OF ACCESS POINTS ONTO EACH RIGHT OF WAY
 EXCEEDS THE 2 PERMITTED VIA SEC. 94-312 AND NO PROPERTY
 SHALL HAVE A TOTAL OF MORE THAN 4 ACCESS POINTS. WILL
 REQUIRE AN ADDITIONAL VARIANCE REQUEST.
 THESE ARE JUST SOME EXAMPLES OF PENDING VARIANCE
 REQUESTS, ADDITIONAL VARIANCES ARE DEPENDENT ON MEETING
 OTHER REQUIREMENTS OUTLINED IN THE COMMENTS OR WITHIN
 THE CODE, UPON RESBMITTAL.
  
 IT IS ON THE APPLICANT TO PROVIDE ALL REQUESTED
 VARIANCES TO PLANNING STAFF. PLEASE REMEMBER THAT YOU
 WILL BE CHARGED $300 PER ADDITIONAL VARIANCE OR WAIVER.
  
 TV JULY 19TH RESPONSE: WE ANTICIPATE NEEDING VARIANCES
 RELATED TO THE FOLLOWING:
 ? MAXIMUM BUILDING FOOTPRINT LENGTH EXCEEDS 350 FT.
 ? THE NUMBER OF ACCESS POINTS ONTO CLEARWATER EXCEEDS
 THE 2 PERMITTED VIA SEC. 94-312.
 ? CURB CUTS, PARKING ENTRANCES AND DRIVEWAYS WIDTHS
 ? PLANAR BREAKS GROUND FLOOR
 ? PLANAR BREAKS PODIUM LEVELS 2-7
  
 WE BELIEVE THAT THE OPEN SPACE REQUIREMENT IS MET ON
 THE GROUND FLOOR WITHOUT USING LEVEL 2 AND THE LEVEL 2
 OPEN SPACE IS BONUS SPACE, SO NO VARIANCE IS REQUIRED.
  
 ZONING 8.19 - [ACKNOWLEDGED] DUE TO THE UNRESOLVED
 COMMENTS WITHIN THIS REVIEW, ADDITIONAL VARIANCES MAY
 BE REQUIRED OR EXISTING REQUESTS MAY HAVE TO BE
 MODIFIED.
  
 7. PLEASE PROVIDE AN UPDATED SURVEY CLEARLY
 DOCUMENTING THE CHANGES INCORPORATED AS PART OF THE
 RECENT BANYAN-BOULEVARD STREETSCAPE PROJECT. ALL PLAN
 SHEETS MUST REFLECT THE ACCURATE BANYAN STREET
 CONFIGURATION. THIS IS CURRENTLY NOT REFLECTED ON ANY
 OF THE SUBMITTED PLAN SHEETS. [SURVEY UPDATED TO SHOW
 CHNAGES TO BANYAN BOULEVARD GEOMETTRY] [NOT SATISFIED]
 THANK YOU FOR PROVIDING REVISED SURVEY AND PLANS WITH
 EASEMENTS ILLUSTRATED. BASED UPON THESE SHEETS AND
 ITEMS:
  
  SEE COMMENT 5. RESUBMITTED SURVEY DOES NOT APPEAR TO
 BE ACCURATE, DOES NOT FULLY REFLECT NEW BANYAN
 STREETSCAPE CONDITIONS AND UPDATE. MISSING THE
 HARDENING DONE BY FPL TO THEIR TRANSMISSION LINES,
 THERE IS A NEW / LARGER POLE ON BANYAN. TREE GRATES ON
 BANYAN SIDE NO LONGER EXIST. ROW INCLUIDES A BIKE PARTH
 AND PEDESTRAIN SIDEWALK.
  
 TV JULY 19TH RESPONSE: REPEAT SEE RESPONSE ABOVE. THESE
 ROAD IMPROVEMENTS WHICH ARE INCONSISTENT WITH THE
 CURRENT SITE PLAN APPROVAL ARE ONGOING. TO ADDRESS THIS
 COMMENT, WE HAVE INCORPORATED THE IMPROVEMENTS SHOWN ON
 THE BANYAN AVENUE CONSTRUCTION PLAN PROVIDED BY WPB
 ENGINEERING DEPARTMENT ON THE PROPOSED PLANS.
 ZONING 8.19 - [SATISFIED] RESUBMITTED SURVEY APPEARS TO
 ACCURATELY REFLECT SITE CONDITIONS, SURROUNDING
 CONTEXT, AND BANYAN STREETSCAPE. VACATING/MODIFYING THE
 FPL EASEMENT ACROSS THE SITE AND RELOCATING CONCRETE
 POWER POLES POSES MAJOR CONCERNS TO LOCATION OF
 PROPOSED STRUCTURES OR IMPROVEMENTS WITHIN THE SITE
 PLAN.
  
 UPON REVIEW OF NEWLY SUBMITTED SURVEY, CURRENT
 CONDITIONS ARE NOT REFLECTED. FPL CURRENTLY HAS TWO
 DISTRIBUTION POLES ON THE BANYAN FRONTAGE, ONE OF WHICH
 IS A NEW POLE (ADDED WITH THE BANYAN STREETSCAPE
 IMPROVEMEN TS); PLEASE PROVIDE A LETTER FROM FPL
 CONFIRMING/ APPROVING OF THE RELOCATION OF THIS POLE
 AND THE VACATION/MODIFICATION OF THE EASEMENT. SITE
 PLANS AND CIVIL PLANS SHOW ON-STREET DROP-OFF, WHICH IS
 NOT PE RMITTED WITHIN THE TOD DISTRICT ON BANYAN.
  
 A. PROPOSED RESIDENTIAL ON-STREET DROP OFF ON BANYAN
 FRONTAGE NOT PERMITIED WITHIN TOD-25 DISTRICT. [THIS IS
 AN EXISTING VESTED FEATURE WHICH THE APPLICANT BELIEVES
 OFFERS A SAFE PLACE OUTSIDE OF THE RIGHT OF AWAY FOR
 RESIDENTS TO BE PICKED UP BY RIDE SHARE PROVIDERS.]
 [NOT SATISFIED] REPEAT COMMENT. PROPOSED RESIDENTIAL
 ON-STREET DROP OFF ON BANYAN FRONTAGE NOT PERMITTED
 WITHIN TOD-25 DISTRICT
  
 RESPECTFULLY NOTE HERE ARE NO VESTED / CARRIED OVER
 APPROVALS, THIS IS A NEW SITE PLAN/PROJECT. PER SECTION
 94-111 TABLE IV-11: ON-STREET PASSENGER LOADING AND
 DROP-OFF IS NOT PERMITTED WITHIN THE TOD DISTRICT ALONG
 AVENUE STREET CLASSIFICATIONS (BANYAN BOULEVARD).
  
 ADDITIONALLY, THE PROPOSED DROP-OFF DIRECTLY CONFLICTS
 WITH THE NEW BANYAN STREETSCAPE. CONFLICTING WITH THE
 IMPROVED PEDESTRIAN ENVIRONMENT WITH THE BIKE LANE /
 SIDEWALK.
  
 TV JULY 19TH RESPONSE: REPEAT SEE RESPONSE ABOVE. AS TO
 THE PREVIOUSLY APPROVED BANYAN STREET DROP-OFF, TV HAS
 REMOVED THIS FROM ITS AMENDED SITE PLAN SUBMISSION.
 ZONING 8.19 - [SATISFIED]
  
 8. SETBACKS ARE MEASURED FROM THE BACK OF CURB, NOT
 FROM THE PROPEORTY LINE. [PLANS REVISED TO SHOW SETBACK
 FROM BACK OF CURB]
  
 A. SETBACK ON BANYAN (GROUND 5) IS 16? MIN. AND 50?
 MAX. (AVENUE-CLASSIFICATION) CONDITIONAL SETBACK FOR
 PARKING ABOVE 5TH STORY IS 31? MIN. [THE PLANS PROVIDED
 MEET THE REQUIRED SETBACK_CRITERIA AND THE CONDITIONAL
 SETBACK FOR PARKING ABOVE 5TH STORY IS COMPLIANT]
 [PARTIALLY SATISFIED] THANK YOU FOR THE REVISIONS,
 BASED UPON THESE: PLEASE PROVIDE MAX SETBACK AND ANY
 APPLICABLE CONDITIONAL SETBACK LINES ON SITE PLANS,
 BASED UPON THESE: PLEASE PROVIDE MAX SETBACK AND ANY
 APPLICABLE CONDITIONAL SETBACK LINES ON SITE PLANS,
 ELEVATIONS, AND RELEVANT FLOOR PLANS, UPDATE DATA TABLE
 ON SHEET A0-02 ACCORDINGLY TO REFLECT ALL PROVIDED
 SETBACKS PER FRONTAGE.
  
 TV JULY 19TH RESPONSE: PROVIDED ON PLANS (SEE SHEETS
 A0-01,??) PLEASE NOTE THAT THE CONDITIONAL SETBACK FOR
 PARKING IS MET AS THE ENTIRE GARAGE IS SET BACK FARTHER
 THAN THE STATED MINIMUM.
 ZONING 8.19 - [SATISFIED]
  
 B. SETBACK ON CLEARWATER (GROUND ? 5) IS 12? MIN. AND
 60? MAX. (SECONDARY-CLASSIFICATION) CONDITIONAL SETBACK
 FOR PARKING ABOVE 5TH STORY IS 27? MIN. [THE PLANS
 PROVIDED MEET THE REQUIRED SETBACK CRITERIA AND THE
 CONDITIONAL SETBACK FOR PARKING ABOVE 5TH STORY IS
 COMPLIANT]
  
 C. ABUTIING CSX IS 15? MIN. [ACKNOWLEDGED] [SATISFIED]
  
 D. REAR 5? MIN. [ACKNOWLEDGED] [SATISFIED]
  
 E. SIDE INTERIOR O? OR NFPA [ACKNOWLEDGED] [SATISFIED]
  
 F. SETBACKS INTERNALTO THE PROPERTY BETWEEN COUNTY ITC,
 SFRTA, AND APPLICANTS PROPERTIES WARRANT FURTHER
 DISCUSSION. AS PREVIOUSLY STATED, THE PROJECT SITE IS
 SPLIT BETWEEN 2 SEPARATE PARCELS, AND POTENTIAL
 VERTICAL SUBDIVISION. [SETBACK AND SEPARATION WILL BE
 HANDLED BY SEPARATE AGREEMENT BETWEEN THE AFFECTED
 PARTIES] [NOT SATISFIED] FURTHER CLARIFICATION /
 DISCUSSIONS NEEDED WITH VERTICAL SUBDIVISION
  
 TV JULY 19TH RESPONSE: SEE RESPONSE ABOVE.
 ZONING 8.19 - [ACKNOWLEDGED]
  
 9. PARKING: THE PARKING TABLE NEEDS TO BE CORRECTED TO
 BETTER CONVEY THE PARKING COUNTS. PLEASE NOTE, WHILE
 NOT MANDATORY, STAFF HAS INCLUDED THE ADDITIONAL
 ALLOWED 25% TOD PARKING SPACE REDUCTION. [SEE PARKING
 BREAKDOWN AND MIN MAX COMPARISON PROVIDED. THE TOTAL
 MINIMUM PARKING PERMITIED IS 1,684 OR (1,347 LESS 20%
 REDUCTION FOR TOD)
  
  TOTAL MAXIMUM PARKING PERMITIED IS 3,142 OR (2,514
 LESS 20% REDUCTION FOR TOD)
  
  STRAIGHT CODE TEST:
  
 MINIMUM AND MAXIMUM RANGE WITHOUT TOD REDUCTION IS
 1,684 TO 3,142 SPACES. THEREFORE THE 2,003 PROPOSED
 SPACES IS COMPLIANT TO LDRS
  
 MINIMUM AND MAXIMUM RANGE WITH TOD REDUCTION IS 1,347
 TO 2,514 SPACES. THEREFORE THE 2,003 PROPOSED SPACES IS
 COMPLIANT TO LDRS EVEN WITH THE NON MANDATORY 20%
 REDCUTION IMPOSED
  
 NON-CODE TEST EXCLUDING THE SFRTA AND COUNTY SPACES
 EVEN WITH THE SFRTA COUNTY SPACES COUNTED AS ALL BEING
 ABOVE MINIMUM THE PARKING PROVIDED WOULD STILL COMPLY
 WITH THE LDRS SEE BELOW:
  
 THE REQUIRED MINIMUM PARKING LESS THE SFRTA AND CONTY
 275 SPACES WOULD BE 1,409 SPACES OR (1,127 SPACES
 REQUIRED IF THE 20% REDUCTION WAS APPLIED.)
  
 THE REQUIRED MAXIMUM PARKING LESS THE SFRTA AND COUNTY
 275 SPACES WOULD BE 2,867 SPACES OR (2,294 SPACES
 REQUIRED IF THE 20% REDUCTION WAS APPLIED.)
  
 MINIMUM AND MAXIMUM RANGE WITHOUT TOD REDUCTION IS
 1,409 TO 2,867 SPACE. THEREFORE, THE PROPOSED 2,003
 SPACES IS COMPLIANT TO LDRS EVEN IF THE 275 SPACES FOR
 THE SFRTA AND COUNTY WERE NOT RECOGNIZED AS A VALID
 PUBLIC USE.
  
 MINIMUM AND MAXIMUM RANGE WITH TOD REDUCTION IS 1,127
 TO 2,294 SPACE. THEREFORE, THE PROPOSED 2,003 SPACES
 WOULD STILL BE COMPLIANT TO LDRS EVEN WITH THE
 NON-MANDATORY 20% REDUCTION IMPOSED WITHOUT THE 275
 SPACES FOR THE SFRTA AND COUNTY BEING RECOGNIZED AS A
 VALID PUBLIC USE.
  
 THE 2003 SPACES PROVIDED IS VWITHINTHE STATED MINIMUM
 AND MAXIMUMS PERMITTED BY CODE NO MATTER THE APPROACH
 USED] [PARTIALLY SATISFIED] REPEAT COMMENT FROM (2.D.)
  
 THANK YOU FOR PROVIDING THE NECESSARY DOCUMENTATION ON
 THE PSA AND ITS AMENDMENTS, IN ADDITION TO THE PARKING
 BREAKDOWN; BASED UPON THIS:
  
 -THE HOTEL ROOM/ AMENITY, RESIDENTIAL, RETAIL, OFFICE,
 GUEST AND SFRTA/COUNTY PARKING SPACES CHECK OUT WITH
 REQUIRED MINIMUMS AND 25% TOD REDUCTION.
 - CLARIFICATION, TABLE IV-9: MICRO-UNITS MINIMUM
 PARKING REQUIREMENT IS ZERO, NOT 1 /13 UNITS. ONLY
 CAR-SHARE HAS 1 /13 REQUIREMENT.
 - PLEASE MAKE CLEAR FROM THE TABLE PROVIDED, ARE YOU
 PROVIDING ONLY 13 SPACES FOR MICRO-UNITS? OR ARE YOU
 ARE PROVIDING 13 SPACES FOR MICRO-UNITS AND THEN
 ADDITIONAL 13 CAR?SHARE SPACES (26 TOTAL) THE CAR-SHARE
 SPACES WOULD BE INDEPENDENT FROM OTHER PARKING AND
 DESIGNATED/RESERVED AS SUCH. PER SECTIONS 94-106(8.A) A
 PROJECT WITH RESIDENTAIL MICRO UNIT SHALL PROVIDE ON
 SIOTE CAR SHARE STATIONS ON A RATIO OF ONE PER EVERY 13
 UNITS. THE TOTAL AMOUNT OF CAR-SHARE STATIONS MAY BE
 REDUCED BY ONE CAR-SHARE STATION PER EVERY 13 ON-SITE
 PARKING SPACES PROVIDED. THE TOTAL NUMBER OF CAR-SHARE
 STATIONS MAY BE ADJUSTED BASED ON CURRENT SYSTEM
 KDEMANDS BUT A MINIMUM OF ONECAR-SHARE STATION SHALL BE
 PROVIDED. THE REMAINDER OF THE SPACES SHALL BE RESERVED
 FOR FUTURE SERVICE EXPANSION.
  
 A. OFFICE: MIN. 2.5/1000SF = 457 SPACES (MAX. 4/1000SF
 = 731 SPACES) AFTER 25% TOD REDUCTION, 343 REQUIRED
 PROVIDING 365 SPACES [SEE ABOVE] [SATISFIED] OFFICE
 PARKING FALLS WITHIN MIN/MAX. CLARIFICATION, OFFICE
 MINIMUM IS 2.5/1000 SF NOT 2/1000 SF.
 B. HOTEL: MIN. 1 /4ROOMS = 27 SPACES, 1 /800 SF= 11
 SPACES (MAX. 1 /R000 = 108 SPACES, 1 /400 SF= 23
 SPACES);_AFTER 25% TOD REDUCTION, 29 REQUIRED;
 PROVIDING 38 SPACES [SEE ABOVE] [SATISFIED]
 C. COMMERCIAL: MIN. 2/1000 SF= 110 SPACES (MAX. 4/1000
 SF= 219 SPACES) AFTER 25% TOD REDUCTION, 83 REQUIRED;
 PROVIDING 110 SPACES [SEE ABOVE] [SATISFIED]
 D. D. RESIDENTIAL: MIN. 1 /UNIT= 821 SPACE, 1 /20
 GUEST= 41 GUEST (MAX. 2/UNIT = 1,642 SPACES, 41 GUEST)
 AFTER 25% TOD REDUCTION, 661 REQUIRED; PROVIDING 896
 SPACES TOTAL, NEED A CLEARER BREAKDOWN. [SEE PARKING
 DATA PROVIDED] SATISFIED]
 E. MICRO-UNITS: MIN. 0/UNIT (MAX.0.5/UNIT = 83 SPACES,
 1 /20 GUEST= 8 SPACES); PROVIDED NEED CLEARER
 BREAKDOWN. [SEE PARKING DATA PROVIDED] [PARTIALLY
 SATISFIED] PLEASE MAKE CLEAR FROM THE TABLE PROVIDED,
 ARE YOU PROVIDING ONLY 13 SPACES FOR MICRO-UNITS? OR
 ARE YOU ARE PROVIDING 13 SPACES FOR MICRO-UNITS AND
 THEN ADDITIONAL 13 CAR-SHARE SPACES (26 TOTAL)? THE
 CAR-SHARE SPACES WOULD BE INDEPENDENT FROM OTHER
 PARKING AND DESIGNATED/RESERVED AS SUCH. PER SECTION
 94-106 (8.A) A PROJECT WITH RESIDENTIAL MICRO-UNITS
 SHALL PROVIDE ON-SITE CAR-SHARE STATIONS ON A RATIO OF
 ONE PER EVERY 13 UNITS. THE TOTAL AMOUNT OF CAR-SHARE
 STATIONS MAY BE REDUCED BY ONE CAR-SHARE STATION PER
 EVERY 13 ON-SITE PARKING SPACES PROVIDED. THE TOTAL
 NUMBER OF CAR-SHARE STATIONS MAY BE ADJUSTED BASED ON
 CURRENT SYSTEM DEMANDS, BUT A MINIMUM OF ONE CAR-SHARE
 STATION SHALL BE PROVIDED. THE REMAINDER OF THE SPACES
 SHALL BE RESERVED FOR FUTURE SERVICE EXPANSION.
  
 TV JULY 19TH RESPONSE: MICRO UNITS ARE PROPOSED TO BE
 PARKED TO CODE WITH 0 SPACES PER UNIT, 13 SHARED CAR
 SPACES, AND 8 GUEST SPACES WITH 83 BIKES TABULAR DATA
 ON SHEET A0-02 HAS BEEN UPDATED.
 ZONING 8.19 - [SATISFIED] PLEASE INCLUDE THE TABULAR
 DATA FOR THE PARKING BREAKDOWN ON SHEET A0-02.
  
 F. LIVE/WORK UNITS: MIN. 2/1000 SF= 534 SPACES (MAX.
 4/1000SF = 1068 SPACES); AFTER 25% TOD REDUCTION, 400
 REQUIRED; PROVIDING NEED CLEARER BREAKDOWN. ALSO THERE
 ARE A TOTAL OF 12 LIVE/WORK UNITS FOR 267,000 SF,
 ASSUMING -22,250 SF EACH? PLEASE EXPLAIN THESE UNITS.
 [THERE ARE NO LIVE WORK UNITS PROPOSED] [SATISFIED]
  
 PRIOR TV RESPONSE: JUSTIFICATION LETTER SPOKE TO
 PREVIOUS APPROVAL LIVE-WORK UNITS, THESE ARE NOT
 CARRIED OVER TO THE CURRENT PROJECT. ZONING 8.19 -
 [ACKNOWLEDGED]
  
  
 G. SFRTA AND ITC PARKING: MIN . 290 SPACES (250 FOR
 SFRTA PATRONS AND 40 FOR SFRTA/COUNTY); PROVIDING 275?
 WHY THE SHORTAGE OF 15 SPACES PER THE PSA? [PSA (AS
 AMENDED) REQUIRES 275 SPACES 250 FOR SFRTA AND 25 FOR
 THE COUNTY] [SATISFIED] LATEST AMENDMENT TO PSA
 (EXHIBIT 2) THAT WAS PROVIDED WITH RESUBMITIAL STATES:
 250 PARKING SP??CES FOR TRI-RAIL, AND 25 SPACES FOR
 COUNTY.
  
 H. TOTAL MIN REQUIRED: 1,467 SPACES (WITHOUT ANY FOR
 MICRO-UNITS AND NOT INCLUDING 534 FOR LIVE/WORK)
 2001WITH LIVE/WORK INCLUDED; 2,291 WITH SFRTA/ITC
 PARKING. NOT COUNTING 25% REDUCTION. PROVIDING 2,003
 SPACES WITH 319 UNALLOCATED. EXPLAIN THE UNALLOCATED.
 [EVERY USE IS PARKED AT THE MINIMUM, ALL EXCESS SPACES
 HAVE BEEN POOLED TOGETHER IN THE UNALLOCATED CATEGORY
 SO THEY ? CAN BE USED AS FLEXIBLE OVER FLOW TO SERVE
 ENTIRE PROJECT WHEN NEEDED] [SATISFIED] PARKING
 TABLE/DATA PROVIDED.
  
 I. BIKE PARKING: MIN. 1/15 COMMERCIAL/HOTEL/OFFICE= 40
 SPACES REQUIRED, 1 /15 RESIDENTIAL= 57 SPACES REQUIRED,
 ALSO NEED TO PROVIDE A SHOWER/CHANGING FACILITY WITHIN
 200 FT. OF BUILDING ENTRANCE. PROVIDING 116 COMMERCIAL,
 100 RESIDENTIAL. [COVERED BIKE PARKING IS PROVIDED AT
 THE GROUND FLOOR OF THE GARAGE. THE REQUIRED SHOWERING
 CHANGING FACILITY IS ALSO PROVIDED AND SHOWN ON THE
 LEVEL TWO PLAZA APPROXIMATELY 75 FEET NORTH OF OFFICE
 AND HOTEL LOBBY ENTRANCE. THESE FACILITIES ARE ALSO
 ACCESSIBLE FROM THE PARKING GARAGE SOUTHEAST ELEVATOR
 AND STAIR.] [NOT SATISFIED] UPON REVIEW OF RESUBMITIED
 PARKING DATA, REQUIRED SPACES ARE 1 /15 SPACES
 (COMMERCIAL, OFFICE, HOTEL) AND 1 /1 SPACES
 (RESIDENTIAL). TOTALING 35 AND 59 REQUIRED BIKE SPACES
 RESPECTIVELY. PLEASE PROVIDE TOTAL COUNT OF BIKE SPACES
 INTERNAL TO BUILDING ON SHEET A0-02, DIAGRAM ON A5-02
 PROVIDES 72 SPACES (2 PER RACK), REQUIREMENT IS 94 FOR
 THESE PROJECT USES.
  
 MICRO-UNIT PROVISIONS (PER. SEC. 94-106 8.A.) REQUIRES
 0.5 BICYCLE PARKING SPACES PER UNIT. REQUIRING 83
 SPACES
  
 BIKE SPACES SHALL BE DISTRIBUTED AMONGST THE
 BUILDINGS/VARIED USERS NOT CONCENTRATED WITHIN A SINGLE
 ROOM OR LOCATION. OFFICE/HOTEL USERS HAVE TO TRAVEL
 OVER 600 FT. TO ACCESS ENCLOSED BIKE PARKING.
 RETAIL/COMMERCIAL USERS ON BANYAN/CLEARWATER SIDE HAVE
 TO TRAVEL THE SAME 600+ FT. DISTANCE TO ACCESS SHOWERS.
 RECOMMEND THAT THE DISTRIBUTION SHOULD ENTAIL A MORE
 APT RATIO OR DISTRIBUTION OF ONE ENCLOSED/SECURED BIKE
 ROOM AND SHOWER FACILITY PER TOWER.
  
 TV JULY 19TH RESPONSE: A PUBLIC SHOWER AREA IS NOW
 PROVIDED IMMEDIATELY ADJACENT TO THE EASTERN PUBLIC
 BIKE ROOM.
 ZONING 8.19 - [SATISFIED] NEW SHOWER FACILITY PROVIDED.
 PLEASE PROVIDE DETAIL SHEET SIMILAR TO A5-02 FOR THE
 ADDITIONAL RACKS/BIKE ROOMS SHOWN ON A1.01-A1.05
  
 1. PROVIDE SECURE RESIDENT BICYCLE ROOMS. PROVIDE
 NON-RESIDENTIAL COVERED BICYCLE PARKING "AREAS
 DISTRIBUTED THROUGHOUT THE SITE. PROVIDE THE DIMENSIONS
 FOR THE BICYCLE PARKING AREAS ON THE PLANS. [COVERED
 SECURE BIKE PARKING IS PROVIDED AT THE GROUND FLOOR
 LEVEL OF THE GARAGE] [DETAILS AND DIMENSIONS PROVIDED]
 [NOT SATISFIED] UPON REVIEW OF RESUBMITIED PARKING
 \DATA; BIKE PARKING INTERNAL TO BUILDING NEEDS TO MEET
 MINIMUM REQUIREMENTS OF 94 SECURED SPACES, GROUND FLOOR
 ONLY SHOWS 72 SPACES. NOT INCLUDING ADDITIONAL 83
 SPACES DEDICATED TO MICRO-UNIT USE. ON SHEETS A1-03,
 A1-04, AND A1-05 ROOM INTERNAL TO GARAGE LABELED
 SCOOTER/BIKE PARKING? HOW ARE THESE ROOMS / SPACES
 ACCESSED, ARE THERE ADDITIONAL RACKS LOCATED HERE, AND
 WHAT ARE THE DIMENSIONS. PLEASE PROVIDE MORE DETAIL OF
 THESE AREAS.
  
 REPEAT FROM (9.1.1.) BIKE SPACES SHALL BE DISTRIBUTED
 AMONGST THE BUILDINGS/VARIED USERS NOT CONCENTRATED
 WITHIN A SINGLE ROOM OR LOCATION. OFFICE/HOTEL USERS
 HAVE TO TRAVEL OVER 600 FT. TO ACCESS ENCLOSED BIKE
 PARKING. RETAIL/COMMERCIAL USERS ON BANYAN/CLEARWATER
 SIDE HAVE TO TRAVEL THE SAME 600+ FT. DISTANCE TO
 ACCESS ENCLOSED BIKE PARKGIN. RETAIL / COMMERCAIL USERS
 ON BANYAN; CLEARWATER SIDE HAVE TO TRAVEL THE SAME 600+
 FT DISTANCE TO ACCESS SHOWERS. RECOMMEND THAT THE
 DISTRUCBUTION SHOULD ENTIAL A MORE APT RATIO OR
 DISTRIBUTION, RECOMMEND ONE ENCLOSED / SECURE BIKE ROOM
 AND SHOWER FACILITY PER TOWER.
  
 TV JULY 19TH RESPONSE: ADDITIONAL SECURE BIKE ROOMS
 HAVE BEEN ADDED TO THE SOUTHERN RESIDENTIAL BUILDING
 AND THE HOTEL/OFFICE BUILDING (SEE SHEETS A1-02, A1-03,
 A1-04 AND A1-05. SHOWERS ARE NOT NECESSARY FOR THE
 RESIDENTIAL TOWERS.
 ZONING 8.19 - [SATISFIED] REPEAT: PLEASE PROVIDE DETAIL
 SHEET SIMILAR TO A5-02 FOR THE ADDITIONAL RACKS/BIKE
 ROOMS SHOWN ON A1.01-A1.05
  
 ACCESS TO BIKE STORAGE LIMITED TO REAR ENTRANCE ON CSX
 / BANYAN CORNER OF THE SITE, NO INTERNAL ACCESS APPEARS
 TO BE AVAILABLE OUTSIDE OF CROSSING OVER THE ADA
 SPACES. PLEASE CONSIDER REVISIONS.
  
 TV JULY 19TH RESPONSE: A CORRIDOR WAS ADDED TO ACCESS
 THE BIKE ROOM AND SHOWER FROM THE EASTERN COVERED
 WALKWAY AND NOT THROUGH THE ADA SPACES.
 ZONING 8.19 - [SATISFIED] REPEAT: PLEASE PROVIDE DETAIL
 SHEET SIMILAR TO A5-02 FOR THE ADDITIONAL RACKS/BIKE
 ROOMS SHOWN ON A1.01-A1.05
  
 2. WHERE ARE THE SHOWER/CHANGING FACILITIES LOCATED?
 [THE REQUIRED SHOWERING CHANGING FACILITY IS ALSO
 PROVIDED AND SHOWN ON THE LEVEL TWO PLAZA APPROXIMATELY
 75 FEET NORTH OF OFFICE AND HOTEL LOBBY ENTRANCE. THESE
 FACILITIES ARE ALSO ACCESSIBLE FROM THE PARKING GARAGE
 SOUTHEAST ELEVATOR AND STAIR.] [NOT SATISFIED] THANK
 YOU FOR PROVIDING SHOWER FACILITIES WITHIN THE PLAN,
 PLEASE LABEL AND INDICATE THESE CLEARLY. BASED UPON THE
 RESPONSE AND RESUBMITIAL:
  
 CLARIFICATION, ARE THESE THE THREE ORANGE ROOMS BETWEEN
 THE RETAIL BAYS ON SHEET A1-02? CAN THE SHOWER
 FACILITIES BE LOCATED CLOSER TO THE PROPOSED BIKE
 STORAGE ROOM OR BETIER DISTRIBUTED AMONG THE BUILDINGS?
  
 REPEAT FROM (9.1.1.) BIKE SPACES SHALL BE DISTRIBUTED
 AMONGST THE BUILDINGS/VARIED USERS NOT CONCENTRATED
 WITHIN A SINGLE ROOM OR LOCATION. OFFICE/HOTEL USERS
 HAVE TO TRAVEL OVER 600 FT. TO ACCESS ENCLOSED BIKE
 PARKING. RETAIL/COMMERCIAL USERS ON BANYAN/CLEARWATER
 SIDE HAVE TO TRAVEL THE SAME 600+ FT. DISTANCE TO
 ACCESS SHOWERS. RECOMMEND THAT THE DISTRIBUTION SHOULD
 ENTAIL A MORE APT RATIO OR DISTRIBUTION OF ONE
 ENCLOSED/SECURED BIKE ROOM AND SHOWER FACILITY PER
 TOWER.
  
 TV JULY 19TH RESPONSE: AN ADDITIONAL SHOWER LOCATION IS
 PROVIDED ADJACENT TO THE EASTERN GROUND FLOOR BIKE ROOM
 SO THERE ARE NOW 2 SEPARATE SHOWER FACILITIES.
 ADDITIONAL BIKE ROOMS HAVE BEEN DISTRIBUTED ON SITE AND
 PROVIDED FOR EACH USE (SEE SHEETS A1-02, A1-03, A1-04
 AND A1-05).
 ZONING 8.19 - [SATISFIED] REPEAT: PLEASE PROVIDE DETAIL
 SHEET SIMILAR TO A5-02 FOR THE ADDITIONAL RACKS/BIKE
 ROOMS SHOWN ON A1.01-A1.05
  
 J. IN THOSE CASES WHERE THE SIDE OF ANY PARKING STALL
 IS ADJACENT TO A WALL, FENCE, BUILDING, OR OTHER
 PHYSICAL OBSTRUCTION, THE STALL WIDTHS SHALL BE
 INCREASED BY A MINIMUM OF ONE FOOT. WHERE THERE IS AN
 OBSTRUCTION ON BOTH SIDES OF THE STALL, THE STALL
 WIDTHS SHALL BE INCREASED BY A MINIMUM OF TWO FEET.
 [ACKNOWLEDGED ? WE WILL BE UTILIZING THE ALLOWABLE
 PARKING REDUCTIONS AND OR USING COMPACT SPACE
 PROVISIONS TO ENSURE PROPER SEPARATION IS MAINTAINED]
 (NOT SATISFIED] PLEASE PROVIDE DIMENSIONS OR DETAILS
 INDICATING SEPARATION IS MAINTAINED. PLEASE FOLLOW SEC.
 94-485 (N. )(1.) FOR SMALL CAR SPACE REQUIREMENTS, AND
 OUTLINE PERCENTAGE/INDICATE ON DRAWINGS ACCORDINGLY.
  
 TV JULY 19TH RESPONSE: PARKING DETAILS HAVE BEEN
 PROVIDED TO SHOW MINIMUM DIMENSION FOR ALL PARKING
 SPACES INCLUDING DETAILS DESCRIBING REQUIRED DIMENSIONS
 WHEN ADJACENT TO A WALL OR COLUMN (SEE SHEETS C-12,
 C-13).
  ZONING 8.19 - [SATISFIED]
  
 3. PARKING GARAGE HAS INSTANCES WHERE PARKING SPACES
 APPEAR TO BE NEXT TO WALLS OR STRUCTURE. [ADJUSTMENTS
 TO BE MADE AS INDICATED ABOVE ON FINAL PERMITS TO
 ENSURE COMPLIANCE] [NOT SATISFIED] SEE ABOVE
  
 TV JULY 19TH RESPONSE; SEE ABOVE.
 ZONING 8.19 - [SATISFIED] IF COMPACT SPACES ARE TO BE
 USED DUE TO CONSTRAINTS OF WALLS, COLUMNS, OR
 STRUCTURES, PLEASE ILLUSTRATE ON PLANS AND
 DESIGNATE/STRIPE ACCORDINGLY PER SEC. 94-485.
  
 4. ADA PARKING SPACES ARE LOCATED IN INEFFICIENT AND
 NOT OPTIMAL AREAS. ALL SPACES SHALL HAVE ACCESS TO A
 CURB RAMP OR CURB CUT, WHEN NECESSARY, TO ALLOW
 ENTRANCE TO THE BUILDING SERVED. SPACES SHALL BE
 LOCATED SO THAT USERS ARE NOT COMPELLED TO WALK OR
 OTHERWISE MOVE BEHIND PARKED VEHICLES, EXCLUDING OTHER
 VEHICLES PARKED IN ADJACENT PARKING SPACES FOR THE
 DISABLED. [ADA SPACES HAVE BEEN ADJUSTED TO PROVIDE
 EFFICIENT ACCESS ROUTES TO AND FROM ENTRY POINTS OR
 ELEVATOR CORES] [NOT SATISFIED] THANK YOU FOR PROVIDING
 ADJUSTMENTS AND ALTERING PLANS, BASED UPON THESE
 CHANGES:
  
 ADA DISTRIBUTION AFTER RECONFIGURATION STILL POSES
 QUESTIONS FOR CLARIFICATION.
 A) PLEASE PROVIDE CLARIFICATION OF HOW ADA PATRONS OF
 OFFICE, HOTEL, RETAIL, AND TRI-RAIL USERS WILL SAFELY &
 EFFICIENTLY ACCESS THESE FACILITIES FROM THE GARAGE.
  
 TV JULY 19TH RESPONSE: THE SFRTA AND THEIR ADA PATRONS
 WILL ACCESS THE ELEVATOR CORES LOCATED IN THE SOUTHWEST
 CORNERS OF THE GARAGE OR FROM THE DESIGNATED HC VAN
 ACCESSIBLE SPACES ON THE GROUND FLOOR. THE PLANS HAVE
 BEEN AMENDED TO RELOCATE THE ADA SPACES CLOSER TO THE
 ELEVATOR AND SHOW THE LOCATION OF THE MOST CONVENIENT
 ADA SPACES WITH THE SHORTEST ROUTES TO ACCESS THE
 GROUND FLOOR AND OTHER USES ON SITE (SEE SHEET A0-04).
  ZONING 8.19 - [SATISFIED] ADA SPACES RELOCATED TO
 APPROPRIATE ELEVATOR CORRIDORS.
  
 B) CURRENT ADA SPACE DISTRIBUTION ON SHEET A1-02 (FOR
 SFRTA PATRONS AND COUNTY EMPLOYEES) FORCES ADA USERS TO
 TRAVEL THROUGH RESIDENTIAL LOBBY ELEVATORS TO ACCESS
 REST OF SITE. DISTRCBUTION OF ADA SPACES ONTHIS LEVEL
 SHALL PROVIDE SHORTEST / MOST EFFICENT PATH TO END USE,
 ADA SAPCES SHOLD BE LOCATED AT THE ELEVATOR SHAFT
 CONNECTED TO UPPER PLAZA AND THE ELEVATOR SHAFT CLOSEST
 TO THE TRI RAIL PEDESTRAIN BRIDGE
  
 TV JULY 19TH RESPONSE: REPEAT SEE ABOVE.
 ZONING 8.19 - [SATISFIED] ADA SPACES RELOCATED TO
 APPROPRIATE ELEVATOR CORRIDORS.
  
 C) IS THE INTENTION FOR GENERAL PUBLIC WITH ADA NEEDS
 TO ACCESS REST OF SITE/RETAIL VIA ELEVATORS THROUGH THE
 RESIDENTIAL TOWERS?
  
 TV JULY 19TH RESPONSE: REPEAT SEE ABOVE
 ZONING 8.19 - [NOT SATISFIED] GENERAL PATRONS OF THE
 SITE (OFFICE, HOTEL, VISITORS) WITH ADA NEEDS THAT PARK
 ON FLOORS 3-8 DO NOT HAVE SPACES ADJACENT TO
 NON-RESIDENTIAL ELEVATORS AND CORRIDORS. REDISTRIBUTE
 OR INCLUDE SPACES IN THE AREAS SIMILAR TO LEVEL 2.
  
 GROUND LEVEL, THE ADA VAN SPACE AT THE END OF THE ROW
 FORCES USERS TO WALK BEHIND OTHER PARKED CARS TO ACCESS
 DOORS TO BIKEROOM/OUTSIDE. ADA CODE LANGUAGE MORE
 RESTRICTIVE THAN ZONING PROVISION. THIS SPACE IS NOT
 COMPLIANT AND WILL NEED TO BE RELOCATED / REMOVED FROM
 HOW IT IS CURRENTLY SHOWN.
  
 TV JULY 19TH RESPONSE: REPEAT SEE ABOVE
  ZONING 8.19 - [SATISFIED] ADA PATH/CORRIDOR PROVIDED
 IN FRONT OF SPACES.
  
 D) GROUND ITC ADA PATH FOR VANS, NOT THE CLOSEST /MOST
 EFFICIENT OR DIRECT ACCESS TO REST OF SITE, ONLY
 BENEFITS RETAIL SPACES ALONG THE CSX FRONTAGE. BETTER
 DISTRIBUTION WOULD BE AROUND UPPER LEVEL ELEVATOR
 SHAFTS.
 V. PLEASE PROVIDE PARKING PAINTED STRIPING DETAILS THAT
 MEET THE CITY STANDARDS OF SEC. 94-485. [PLANS AMENDED
 TO INCLUDE DETAILS] [SATISFIED]
 VI. PLEASE PROVIDE ALL PARKING DIMENSION FOR DRIVE
 ISLES PARKING RAMPS SLOPES, PARKGIN STALL ETC. {PLANS
 AMENDED TO INCLUDE DETAIL AND DIMENSIONS][SATISFIED]
  
 K. PARKING STRUCTURE RAMP SLOPES: INTERNAL RAMPS APPEAR
 15.8% AND 12.4%. PER SEC. 94-111 (Q.)(2.) IF THE RAMP S
 GREATER THAN 14 PERCENT, A BREAK-OVER TRANSITION SHALL
 BE REQUIRED. [TYPICAL CODE COMPLAINT DIMENSIONS
 PROVIDED. RAMP SLOPE AMENDED TO PROVIDE COMPLAINT SLOPE
 OR BREAK-OVER TRANSITION] [SATISFIED]
  
 L. INTERNAL PARKING STRUCTURE POSES CONCERNS WITH
 INGRESS / EGRESS OF RESIDENTS, EMPLOYEES, VISITORS, AND
 THE OPERATIONS OF LOADING AND BICYCLE USERS. LOADING
 SPACES AND BAYS ARE INEFFICIENT AND CAUSE CONFLICT
 ZONES/SAFETY CONCERNS. POTENTIAL SPILLBACK AND QUEUING
 ISSUES ONTO CLEARWATER. [WE DISAGREE. LOADING AND
 ACCESS IS EFFICIENT AND MEETS CODE THE CONCEPT TO
 CREATE A SINGULAR GARAGE TO SERVE THE ENTIRE
 DEVELOPMENT AS A TRANSIT FACILITY. THE IDEA IS TO NOT
 PARK THE SITE AS A TYPICAL DEVELOPMENT WITH GARAGES
 PROVIDED IN EACH BUILDING BUT RATHER A MORE URBAN
 CONCEPT THAT PARKS CARS CENTRALLY TO THE DEVELOPMENT
 WITH PATRONS AND RESIDENTS WALKING THE SHORT DISTANCE
 TO AND FROM THE INTENDED END USE] [NOT SATISFIED]
 PLEASE PROVIDE JUSTIFICATION FOR DOUBLE INGRESS RAMP
 AND DOUBLE EGRESS RAMP.
  
 TV JULY 19TH RESPONSE: THE CODE REQUIRES ALL TRAFFIC
 MOVEMENTS, INCLUDING STACKING, TO BE INTERNALIZED. THE
 CODE DOES NOT PROHIBIT OR REGULATE THE NUMBER OF LANES.
 THE TWO LANES ARE REQUIRED TO HANDLE THE CAPACITY OF
 THE GARAGE AND SO AS TO MINIMIZE STACKING ON
 CLEARWATER. THERE ARE SEVERAL EXAMPLES OF DUAL RAMPS ON
 LARGER PROJECTS WITHIN THE CITY (I.E. KRAVIS CENTER,
 PHILLIPS POINT). THE APPLICANT HAS MODIFIED THE PLANS
 TO TAPER THE DUAL UP RAMP TO ONE LANE PRIOR TO VEHICLES
 GETTING TO LEVEL 02. WE HAVE ALSO INCORPORATED A LANE
 SEPARATOR AS REQUESTED. (SEE SHEET A1-01)
 ZONING 8.19 - [SATISFIED]
  
 GROUND LEVEL LOADING BAYS AND OPERATION CREATES CLEAR
 CONFLICT POINTS AND IS A TRAFFIC / SAFETY HAZARD WITH
 INGRESS/EGRESS OF PATRONS TO THE UPPER LEVELS OF THE
 GARAGE AND GROUND LEVEL ADA ACCESS. QUEUING AND
 SPILLBACK IS AN INEVITABILITY DURING OPERATIONAL HOURS.
  
 TV JULY 19TH RESPONSE: A DOCK MANAGEMENT PLAN WILL BE
 PROPOSED AND A DOCK MASTER WILL BE ON SITE TO CONTROL
 TRAFFIC WHEN DELIVERY OR ADA VEHICLES ENTER THE LOADING
 AREA.
 ZONING 8.19 - [PARTIALLY SATISFIED] PLEASE PROVIDE THIS
 PLAN OR OPERATIONS DETAIL TO PLANNING & CITY TRAFFIC
 ENGINEERS PRIOR TO SITE PLAN APPROVAL.
  
 AUTOTURN FOR DELIVERIES POSES CONFLICT POINTS WITH ADA
 AND OTHER OPERATIONS, INTERSECTS WITH DOWNWARD RAMP.
  
 TV JULY 19TH RESPONSE: A NEW AUTO TURN STUDY IS
 PROVIDED AND THE PLANS HAVE BEEN AMENDED TO ELIMINATE
 THE CONFLICT POINT AT THE END OF THE DOWN RAMP (SEE
 SHEET C-18) ALSO SEE ABOVE.
 [SATISFIED]
  
 INTERNAL GARAGE CIRCULATION ALTERNATING ACROSS LEVELS
 WITH ONE-WAY/ TWO WAY AISLES POSES CONCERNS
  
 TV JULY 19TH RESPONSE: THIS IS NECESSARY BECAUSE THE
 RAMPING TO LEVEL 02 ARE BEING MERGED TO ONE LANE AND
 ABOVE LEVEL 02 THERE ARE INTERNAL TWO WAY (SINGLE LANE)
 RAMPS TO ACCESS PARKING ABOVE. TWO LANES GOING UP TO
 LEVEL 02 ARE NECESSARY TO AVOID STACKING ON CLEARWATER.
 IN ORDER TO CONTROL TURNING MOVEMENTS AND TO ELIMINATE
 INTERSECTION CONFLICT ON LEVEL 02, THE TWO LANES HAVE
 PREVIOUSLY MERGE INTO ONE LANE. A DIAGRAM SHOWING THE
 TRAFFIC FLOW IS SHOWN ON SHEET A1-01, A1-02, A1-03,
 A1-04 AND A1-05.
 ZONING 8.19 - [SATISFIED]
  
 IS THE INTENTION FOR GENERAL PUBLIC TO ACCESS REST OF
 SITE/RETAIL VIA ELEVATORS THROUGH THE RESIDENTIAL
 TOWERS?
  
 REPEAT COMMENT OF (9.J. IV.A.) PLEASE PROVIDE
 CLARIFICATION OF HOW GENRAL PUBLIC / USERS OF OFFICE,
 HOTEL RETAIL A GENERAL PUBLIC / USERS OF OFFICE HOTEL,
 RETAIL, AND TRIRAIL USERSWILL EFFIECNTELY ACCESS THESE
 FACILITIES FROM THE CENTRALLY LOCATED GARAGE.
  
 TV JULY 19TH RESPONSE: WE DO NOT ANTICIPATE ANY ACCESS
 THROUGH THE RESIDENTIAL TOWER. THE INTENT IS FOR SFRTA
 AND THEIR ADA PATRONS TO ACCESS THE FACILITY FROM THE
 ELEVATOR CORES LOCATED IN THE SOUTHWEST CORNERS OF THE
 GARAGE OR FROM THE DESIGNATED HC VAN ACCESSIBLE SPACES
 ON THE GROUND FLOOR. THE PLANS HAVE BEEN AMENDED TO
 RELOCATE THE ADA SPACES CLOSER TO THE ELEVATOR AND SHOW
 THE LOCATION OF THE MOST CONVENIENT ADA SPACES WITH THE
 SHORTEST ROUTES TO ACCESS THE GROUND FLOOR AND OTHER
 USES ON SITE. THE GENERAL PUBLIC MAY ALSO ACCESS THE
 PLAZA THROUGH THE EASTERN STAIRWAY, GARAGE ELEVATORS OR
 FROM THE PROMINENT SPIRAL STAIRWAY AND ELEVATOR TO THE
 PLAZA.
 ZONING 8.19 - [PARTIALLY SATISFIED] REPEAT COMMENT FROM
 4.(C.) GENERAL PATRONS OF THE SITE (OFFICE, HOTEL,
 VISITORS) WITH ADA NEEDS THAT PARK ON FLOORS 3-8 DO NOT
 HAVE SPACES ADJACENT TO NON-RESIDENTIAL ELEVATORS AND
 CORRIDORS. REDISTRIBUTE OR INCLUDE SPACES IN THE AREAS
 SIMILAR TO LEVEL 2.
  
 M. THE PARKING GARAGE SHOULD BE PREWIRED FOR EV
 CHARGERS BOTH FOR RESIDENTS AND CUSTOMERS. THE
 ELECTRICAL ROOMS NEED TO BE PROVIDED WITH SUFFICIENT
 SPACE TO ACCOMMODATE THE REQUIRED ELECTRICAL PANELS AND
 AREAS NEED TO BE DESIGNATED FOR THE TRANSFORMERS.
 [ACKNOWLEDGED] [PARTIALLY SATISFIED] IF YOU PLAN TO
 PROVIDE EV SPACES AT THIS TIME, PLEASE SHOW WHERE THESE
 ARE LOCATED.
  
 TV JULY 19TH RESPONSE: THIS IS NOT CODE REQUIREMENT;
 HOWEVER, WE ANTICIPATE HAVING SUBSTANTIAL EV CHARGING
 CAPABILITY AND WILL INSURE THAT ELECTRICAL CAPACITY IS
 SUFFICIENT AND WILL PROVIDE CONDUITS. THE EV TOTALS AND
 LOCATION WILL BE DETERMINED AFTER AMENDED SITE PLAN
 APPROVAL BASED ON MARKET CONDITIONS AND PROVIDED IN TV
 CONSTRUCTION DRAWINGS.
 ZONING 8.19 - [SATISFIED]
  
 10. CURB-CUTS AND PASSENGER LOAD/DROP-OFF: PER SEC.
 94-111 TABLE IV-11 TOD DOES NOT PERMIT ON-STREET AND/OR
 PASSENGER DROP-OFF OR LOADING ON AVENUE (BANYAN). [ONE
 CURB CUT HAS BEEN REMOVED FROM THE BANYAN. ALL OTHER
 CURB CUTS AND PASSENGER PICK UP LOCATIONS HAVE BEEN
 PREVIOUSLY APPROVED IN THEIR RESENT LOCATIONS. ONE AND
 ONE PASSENGER DROP OFF CURB CUT WAS REMOVED ON BANYAN]
 [NOT SATISFIED] BASED UPON THE RESUBMITTED DOCUMENTS:
 [REPEAT COMMENT] PROPOSED RESIDENTIAL ON-STREET DROP
 OFF ON BANYAN FRONTAGE NOT PERMITTED WITHIN TOD-25
 DISTRICT.
  
  TV JULY 19TH RESPONSE: REPEAT SEE RESPONSE ABOVE
 ZONING 8.19 - [SATISFIED]
  
  THERE ARE NO VESTED/CARRIED OVER APPROVALS, THIS IS A
 NEW SITE PLAN/PROJECT. PER SECTION 94-111 TABLE IV-11:
 ON-STREET PASSENGER LOADING AND DROP-OFF IS NOT
 PERMITTED WITHIN THE TOD DISTRICT ALONG AVENUE STREET
 CLASSIFICATIONS (BANYAN BOULEVARD).
  
  TV JULY 19TH RESPONSE: REPEAT SEE RESPONSE ABOVE
 ZONING 8.19 - [SATISFIED]
  
  ADDITIONALLY, THE PROPOSED DROP-OFF DIRECTLY CONFLICTS
 WITH THE NEW BANYAN STREETSCAPE.
  
  TV JULY 19TH RESPONSE: REPEAT SEE RESPONSE ABOVE
 ZONING 8.19 - [SATISFIED]
  
  CURB-CUT ON BANYAN FOR NONCOMPLIANT PASSENGER DROP-OFF
 IS STILL SHOWN ON ALL RESUBMITTED SITE PLANS, LANDSCAPE
 PLANS, AND ENGINEERING PLANS.
  
  STAFF DOES NOT SUPPORT THE RESIDENTIAL DROP-OFF FOR
 THE MIDDLE RESIDENTIAL TOWER ALONG CLEARWATER. PROPOSED
 DOES NOT MAKE SIENSE OPRATIONALLY AND DOPES NOPT
 REFLECT A SAFE PLEASANT PEDESTRIAN ENVIRONMENT OR BUILT
 UP URBAN CONTEXT. CREATES A VEHICULAR-FOCUSED SPACE
 WITH NARROW LANDSCAPE BUFFER, PEDESTRIANS ARE BOUNDED
 BY 2 TRAVEL LANES. BUILDING WOULD BE BETTER ORIENTED
 CLOSER TOWARD CLEARWATER DR. ACTIVATING THE FRONTAGE,
 WITH THE DROP-OFF LOCATED AT THE REAR OF THE BUILDING,
 IN PLACE OF OR ALONG THE PROPOSED LOADING AREA.
 PROVIDES THE MOST DIRECT ROUTE INTO THE GARAGE FOR
 VALET SERVICES AND AVOIDS ADDITIONAL CIRCULATION.
  
  TV JULY 19TH RESPONSE: REPEAT SEE RESPONSE ABOVE ALSO
 TV HAS REVISED THE CIRCULATION TO ELIMINATE THE WESTERN
 OUTSIDE DRIVE LANE TO ACCOMMODATE THIS COMMENT AND
 REPLACED IT WITH LANDSCAPED IMPROVEMENTS (SEE SHEET
 A1-01).
 ZONING 8.19 - [SATISFIED]
  
  A TYPE A PORTE-COCHERE OFF CLEARWATER IS MORE
 COMPATIBLE AND APPROPRIATE FOR THIS SPACE, IF A
 DROP-OFF IS NEEDED ALONG THE RESIDENTIAL FRONTAGE.
 SIMILAR TO EXISTING ITC DROP- OFF IN FRONT OF THE HOTEL
 OFFICE.
  
  TV JULY 19TH RESPONSE: REPEAT SEE RESPONSE ABOVE WE
 HAVE ALSO REVISED THE PLAN TO HAVE LOBBY ENTRANCES BOTH
 FACING CLEARWATER AND EASTERN INTERNAL DRIVE WITH A
 DROP-OFF ON THE EASTERN SIDE OF THE RESIDENTIAL TOWER
 (SEE SHEET A1-01).
 ZONING 8.19 - [SATISFIED]
  
  THE NUMBER OF ACCESS POINTS ONTO EACH RIGHT OF WAY
 EXCEEDS THE 2 PERMIITED VIA SEC. 94-312 AND NO PROPERTY
 SHALL HAVE A TOTAL OF MORE THAN 4 ACCESS POINTS. WILL
 REQUIRE AN ADDITIONAL VARIANCE REQUEST.
  
  TV JULY 19TH RESPONSE: THIS SITE INCORPORATES ACCESS
 (DROP-OFF AND PICK-UP POINTS FOR PALM TRAN, TRI-RAIL
 AND AMTRAK AS WELL AS THE TV DEVELOPMENT AND WERE PART
 OF THE PREVIOUSLY APPROVED SITE PLAN, NEVERTHELESS, TV
 WILL SEEK VARIANCES FOR EACH OF THESE ACCESS POINTS TO
 REMAIN AS INDICATED ON THE AMENDED SITE PLAN.
 ZONING 8.19 - [SATISFIED] REQUESTED VARIANCE
  
  WIDTH OF CURB-CUT BETWEEN RESIDENTIAL TOWERS EXCEEDS
 PERMITTED 25 FT APPEARS TO BE 30 FEET PLEASE PROVIDE
 DIMENSIONS OF ALL CURB CUTS / DRIVE ACCESS
  
  RESPONSE: THE PLANS HAVE BEEN AMENDED TO SHOW THE
 DIMENSIONS OF THE CURB CUT (SEE SHEETS C-10 AND C-11)
 AS THESE ARE RADIAL DRIVEWAYS DUE TO BUSES AND DELIVERY
 VEHICLES ACCESSING THE SITE AS WELL AS THE NUMBER OF
 TRIPS UTILIZING THE DRIVEWAYS, THE WIDTHS ARE WIDER
 THAN THE 25? REQUIREMENT AT THE RIGHT-OF-WAY LINE. THE
 CITY STANDARD FLARED DRIVEWAY IS NOT APPROPRIATE AT
 THESE LOCATIONS. ACCORDINGLY, WE WILL BE APPLYING FOR A
 VARIANCE FOR THESE CURB CUTS.
 ZONING 8.19 - [PARTIALLY SATISFIED] REQUESTED VARIANCE.
 THANK YOU FOR PROVIDING DIMENSIONS ON SHEETS C-10 AND
 C-11. TO CLARIFY, CURB CUT WIDTH IS CALCULATED FROM THE
 INTERSECTION OF THE DRIVEWAY WITH THE PROPERTY LINE,
 NOT NECESSARILY THE RADIUS OR INTERNAL THROAT WIDTH OF
 THE DRIVEWAY. PLEASE BE SURE TO SPECIFY THE DIMENSION
 ACROSS THE PROPERTY-LINE WITHIN THE VARIANCE REQUESTS.
  
  WIDTH OF CURB-CUT BETWEEN RESIDENTIAL TOWER AND
 HOTEL/OFFICE TOWER EXCEEDS PERMITTED 25FT. APPEARS TO
 BE 30 FT. + PLEASE PROVIDE DIMENSIONS OF ALL CURB
 CUTS/DRIVE ACCESS.
  
  TV JULY 19TH RESPONSE: PLANS HAVE BEEN AMENDED TO SHOW
 THE DIMENSIONS OF THE CURB CUT (SEE SHEETS C-10 AND
 C-11) REQUIRED VARIANCES WILL BE REQUESTED.
  
  WIDTH OF CURB-CUTS FOR THE ITC BUS LOOP EXCEEDS
 PERMITTED 25 FT. INGRESS WIDTH NEARLY 60 FT. EGRESS
 APPROXIMATELY 40-45FT. PLEASE PROVIDE DIMENSIONS OF ALL
 CURB CUTS/DRIVE ACCESS.
  
  TV JULY 19TH RESPONSE: PLANS HAVE BEEN AMENDED TO SHOW
 DIMENSIONS OF THE PROPOSED CURB CUT/DRIVE ACCESS AND IS
 58.16 FEET FOR THE INGRESS AND 50.25 FEET FOR THE
 EGRESS. THESE OPENINGS WERE PART OF THE COUNTY?S
 APPROVED ITC SITE PLANS. REQUIRED VARIANCES WILL BE
 REQUESTED
 ZONING 8.19 - [PARTIALLY SATISFIED] REQUESTED VARIANCE.
 THANK YOU FOR PROVIDING DIMENSIONS ON SHEETS C-10 AND
 C-11. TO CLARIFY, CURB CUT WIDTH IS CALCULATED FROM THE
 INTERSECTION OF THE DRIVEWAY WITH THE PROPERTY LINE,
 NOT NECESSARILY THE RADIUS OR INTERNAL THROAT WIDTH OF
 THE DRIVEWAY. PLEASE BE SURE TO SPECIFY THE DIMENSION
 ACROSS THE PROPERTY-LINE WITHIN THE VARIANCE REQUESTS.
  
  WIDTH OF CURB-CUTS FOR THE GARAGE INGRESS/EGRESS
 EXCEEDS PERMITTED 25 FT. WIDTH NEARLY FT. PLEASE
 PROVIDE DIMENSIONS OF ALL CURB CUTS/DRIVE ACCESS.
  
  TV JULY 19TH RESPONSE: PLANS HAVE BEEN AMENDED TO SHOW
 THESE DIMENSIONS. REQUIRED VARIANCES WILL BE REQUESTED.
 ZONING 8.19 - [PARTIALLY SATISFIED] REQUESTED VARIANCE.
 THANK YOU FOR PROVIDING DIMENSIONS ON SHEETS C-10 AND
 C-11. TO CLARIFY, CURB CUT WIDTH IS CALCULATED FROM THE
 INTERSECTION OF THE DRIVEWAY WITH THE PROPERTY LINE,
 NOT NECESSARILY THE RADIUS OR INTERNAL THROAT WIDTH OF
 THE DRIVEWAY. PLEASE BE SURE TO SPECIFY THE DIMENSION
 ACROSS THE PROPERTY-LINE WITHIN THE VARIANCE REQUESTS.
  
  PLEASE PROVIDE AUTO-TURN ANALYSIS FOR THE ITC/BUS LOOP
 OPERATION.
  
  TV JULY 19TH RESPONSE: TRANSIT VILLAGE IS NOT MAKING
 ANY CHANGES TO THE ITC/BUS LOOP OPERATION AND IT IS NOT
 UNDER TRANSIT VILLAGE CONTROL.
 ZONING 8.19 - [ACKNOWLEDGED] TRANSIT VILLAGE IS MAKING
 CHANGES; THE LOCATION, CONFIGURATION, AND SIZE OF THE
 INGRESS/EGRESS FOR THE ITC/BUS LOOP IS CHANGING FROM
 THE EXISTING CONDITIONS. HOWEVER SINCE ITC/SFRTA IS IN
 CONTROL, OPERATIONS LOGISTICS SHALL BE ASSESSED BY
 THOSE ENTITIES.
  
 11. PLEASE PROVIDE AN FAR AND GBA DIAGRAM SHOWING THE
 BREAKDOWN OF THE PROJECT?S COUNTED/UNCOUNTED ROOMS AND
 SPACES. [PLANS UPDATED TO PROVIDE FAR GBA DIAGRAMS)
  
 A. GROSS BUILDING AREA MEANS THE TOTAL FLOOR AREA OF A
 BUILDING, INCLUDING AIR-CONDITIONED OR FULLY ENCLOSED
 STORAGE SPACES, ENCLOSED AREAS ON THE ROOFTOP, SUCH AS
 BATHROOMS AND LOBBIES, STAIRS .AND ELEVATOR AREAS, AND
 EXTERNAL UNENCLOSED CIRCULATION AREAS. THE GROSS
 BUILDING AREA DOES NOT INCLUDE PARKING AREAS;
 UNENCLOSED COLONNADES, PORCHES AND BALCONIES;
 MECHANICAL AND ELECTRICAL SPACES; AND TRASH ROOMS.
 STORAGE SPACES WITHOUT WINDOWS AND ENCLOSED BY SURFACES
 THAT ALLOW FOR NATURAL VENTILATION OR OUTSIDE AIR
 CIRCULATION SHALL NOT BE INCLUDED. [ACKNOWLEDGED] [NOT
 SATISFIED] GROUND LEVEL A6-01, ENCLOSED BIKE STORAGE
 ROOM COUNTS TOWARD GBA/FAR.
  
 TV JULY 19TH RESPONSE: GBA CALCULATION UPDATED TO
 INCLUDED BIKE ROOM AREA (SEE TABULAR SHEET A0-02)
 ZONING 8.19 - [SATISFIED]
  
 VII. GROSS BUILDING AREA REQUIREMENTS:
  
 1. ANY PORTION OF THE PARKING AREA WHICH EXCEEDS THE
 MAXIMUM PARKING RATIO SHALL BE INCLUDED IN THE
 CALCULATIONS OF GROSS BUILDING AREA. THIS SHALL INCLUDE
 STALLS AND ALL ASSOCIATED CIRCULATION AREAS. [PROJECT
 PARKING PROVIDED IS WITHIN THE MINIMUM AND MAXIMUM
 RANGE PERMITTED AND DOES NOT COUNT TOWARD GBA OR THE
 FAR CALCULATIONS] [SATISFIED]
 2. PARKING LOCATED BELOW GRADE SHALL NOT BE COUNTED AS
 PART OF THE GROSS BUILDING AREA. [ACKNOWLEDGED]
 [SATISFIED]
 3. THE GROSS BUILDING AREA SHALL BE MEASURED FROM THE
 OUTSIDE FACE OF EXTERIOR WALLS. [ACKNOWLEDGED]
 [SATISFIED]
  
 12. PLEASE PROVIDE ACTIVE USE DIAGRAM AND CALCULATIONS
 FOR SITE FRONTAGES. [ACTIVE USE DIAGRAM PROVIDED ON
 REVISED PLANS] [SATISFIED]
 ZONING 8.19 - [NOT SATISFIED] BASED UPON RESUBMITTED
 AND REVISED PLANS; PLEASE NOTE ACTIVE USE REQUIREMENT
 ALONG CLEARWATER (SECONDARY) IS 30% OF THE BUILDABLE
 LOT FRONTAGE, NOT 30% OF EACH BUILDING?S FRONTAGE.
 PLEASE RECALCULATE ACTIVE USE AS A PERCENTAGE OF THE
 WHOLE CLEARWATER FRONTAGE/PROPERTY LINE. ALSO, NOTE IN
 THOSE CASES WHERE PUBLIC OPEN SPACE IS PROVIDED ALONG
 THE FRONTAGE LINE, THE OPEN SPACE MAY BE COUNTED AS
 ACTIVE USE AS LONG AS ACTIVE USES ARE PROVIDED ON THE
 FIRST FLOOR OF THE BUILDING ADJOINING THE PUBLIC OPEN
 SPACE. ON SHEET A0-06 PLEASE ADJUST CALCULATIONS TO
 REFLECT ACTIVE USE OF THE ENTIRE CLEARWATER FRONTAGE IN
 TOTAL (I.E. PROVIDE AT LEAST 30% OF THE APPROX. 1,400
 FT. PROPERTY LINE; NEED TO HAVE APPROX. 420 FT. OF
 ACTIVE USE.)
  
  BANYAN (AVENUE) ACTIVE USE REQUIREMENT IS 60% OF THE
 BUILDABLE LOT FRONTAGE, NOT 30% OF THE BUILDING?S
 FRONTAGE. PLEASE RECALCULATE ACTIVE USE AS A PERCENTAGE
 OF THE WHOLE BANYAN FRONTAGE/PROPERTY LINE. ALSO, NOTE
 IN THOSE CASES WHERE PUBLIC OPEN SPACE IS PROVIDED
 ALONG THE FRONTAGE LINE, THE OPEN SPACE MAY BE COUNTED
 AS ACTIVE USE AS LONG AS ACTIVE USES ARE PROVIDED ON
 THE FIRST FLOOR OF THE BUILDING ADJOINING THE PUBLIC
 OPEN SPACE. ON SHEET A0-06 PLEASE ADJUST CALCULATIONS
 TO REFLECT ACTIVE USE OF THE ENTIRE BANYAN FRONTAGE IN
 TOTAL (I.E. PROVIDE AT LEAST 60% OF THE APPROX. 375 FT.
 PROPERTY LINE; NEED TO HAVE APPROX. 225 FT. OF ACTIVE
 USE.)
  
  THE MIN. REQUIRED LINEAR LENGTH OF ACTIVE USE APPEARS
 TO MEET THE REQUIREMENTS, BUT PLEASE ILLUSTRATE AND
 RECALCULATE THE TABULAR VALUES/PERCENTAGES TO BE SURE.
  
 13. IT APPEARS THAT THE ELEVATION DRAWINGS DO NOT MATCH
 THE GROUND LEVEL SITE PLAN. THE ELEVATION DRAWINGS MUST
 INCLUDE HORIZONTAL DIMENSIONS FOR THE VARIOUS FEATURES
 SO THAT STAFF CAN VERIFY THAT THE ELEVATIONS MATCH THE
 SITE PLAN BUT ALSO THAT THE SITE FRONTAGES COMPLY WITH
 THE VARIOUS ZONING REQUIREMENTS. [CHECKED FOR ACCURACY
 AND REVISE AS NEEDED] [NOT SATISFIED] AN EXAMPLE ON
 SHEET A2-01 DETAIL ON THE HOTEL/OFFICE TOWER SHOWS A
 SUPPORT COLUMN NOT ILLUSTRATED WITHIN THE SITE PLANS.
 ADDITIONAL COLUMN SHOWN IN ELEVATION ADJACENT TO THE
 SPIRAL STAIRCASE FEATURE, NOT SHOWN IN SITE PLAN.
 ADDITIONALLY, PLEASE PROVIDE ALL ENTRANCES, DOORS, ETC.
 ON GROUND-LEVEL SO STAFF CAN VERIFY ELEMENTS MATCH SITE
 PLAN. ALL PLANS NEED TO SHOW CONSISTENT AND ACCURATE
 INFORMATION.
  
  TV JULY 19TH RESPONSE: THE PLANS HAVE BEEN REVISED TO
 PROVIDE THE REQUESTED ADDITIONAL DETAIL, SETBACKS, AND
 DIMENSIONS ADDED TO PROVIDE CLARITY.
 ZONING 8.19 - [SATISFIED]
  
 14. PLEASE SPECIFY THE TYPE OF OPEN SPACES (PRIVATE&
 PUBLIC) PROVIDED ON THE DRAWINGS, REFERENCE SEC. 94-109
 AND TABLE IV?7. CLARIFY HOW THE REQUIREMENTS OF EACH
 OPEN SPACE TYPE IS MET WITHIN THE LANDSCAPE DRAWINGS.
 [TYPE OF OPEN SPACES HAVE BEEN PROVIDED ON THE
 LANDSCAPE CALCULATIONS SHEET.]
  
  THANK YOU FOR PROVIDING OPEN SPACES AND CALCULATIONS
 SHEET, BASED ON WHAT WAS SUBMITTED:
  
  [NOT SATISFIED] PUBLIC OPEN SPACE ON CORNER OF
 CLEARWATER & BANYAN LABELED AS COURTYARD, THIS TYPE OF
 PUBLIC SPACE IS NOT PERMITTED IN TOD-25 DISTRICT.
 GARDEN COURTYARD CLASSIFICATION IS PERMITTED. (TABLE
 -IV-6)
 ZONING 8.19 - [NOT SATISFIED] SHEET A0-04, A0-05,
 A1-01, A4-02, L110 SHOWS SPACE STILL LABELED
 INCORRECTLY AS A COURTYARD, PLEASE COORDINATE ALL PLAN
 SETS ARCH, CIVIL, AND LANDSCAPE TO MATCH AND BE
 CONSISTENTLY LABELED. CALCULATIONS FOR GARDEN COURTYARD
 ON SHEET L005 APPEAR TO BE CORRECT, SATISFY. SHEET L002
 LABELS VEGETATED AREA UNDER GARDEN PLAZA (LEVEL 01 OPEN
 SPACE), THERE IS NO GARDEN PLAZA PRESENTED ON GROUND
 LEVEL. REQUIREMENT FOR VEGETATED AREA IS 50% NOT 25%.
 ON SHEET L002 THE VEGETATED AREA NEEDS TO BE CALCULATED
 PER DESIGNATED OPEN SPACE (I.E. OPEN SPACE 1A NEEDS
 50%, 1B NEEDS 50%, 4A NEEDS 20%, ETC.) PLEASE MAKE SURE
 EACH INDIVIDUAL SPACE MEETS ITS REQUIREMENTS.
  
  SHEET L002 (LANDSCAPE CALCULATIONS) MISLABELED
 COURTYARD IS ON GROUND LEVEL, GARDEN PLAZA IS ON 2ND
 LEVEL, CHECK SF DIMENSIONS. GARDEN PLAZA HAS A MINIMUM
 50% VEGETATED AREA, GARDEN COURTYARD HAS A MINIMUM 50%
 VEGETATED.
 ZONING 8.19 - REPEAT PREVIOUS COMMENT
  
  GARDEN PLAZA HAS A MINIMUM 50% TREE CANOPY, GARDEN
 COURTYARD HAS A MINIMUM 50% TREE CANOPY.
 ZONING 8.19 - REPEAT PREVIOUS COMMENT
  
  SPECIFY SEATING REQUIREMENTS AND HOW THEY ARE MET
 WITHIN THE PROPOSED PUBLIC OPEN SPACES. L005 (GROUND
 LEVEL OPEN SPACE PLAN) OPEN SPACE 1A, 1 B, 1C LABELED
 AS COURTYARD, THIS TYPE OF PUBLIC SPACE IS NOT
 PERMITTED IN TOD-25 DISTRICT. GARDEN COURTYARD
 CLASSIFICATION IS PERMITTED (TABLE IV-6).
 ZONING 8.19 - REPEAT PREVIOUS COMMENT
 SEATING CALCULATIONS FOR GARDEN COURTYARD ON SHEET L005
 APPEARS TO BE CORRECT, SATISFY.
  
  ACTIVE USE ABUTMENT FOR GARDEN COURTYARD IS 2 SIDES OR
 75%. ROW ABUTMENT FOR GARDEN COURTYARD IS 1 SIDE OR
 20%.
 ZONING 8.19 - REPEAT PREVIOUS COMMENT
 ACTIVE USE ABUTMENT CALCULATIONS FOR GARDEN COURTYARD
 ON SHEET L005 APPEARS TO BE CORRECT, SATISFY.
  
  OPEN SPACE 2A ON SHEET L005 (GROUND LEVEL OPEN SPACE
 PLAN) IS INCORRECTLY LABELED AS INTERIOR COURTYARD,
 THIS IS A PRIVATE OPEN SPACE CLASSIFICATION AND IS NOT
 PERMITTED WITHIN TOD-25 SUBDISTRICT. PLEASE IDENTIFY
 THE CORRECT TYPE OF PUBLIC OPEN SPACE THIS IS. NOTE
 PUBLIC OPEN SPACES ARE TO BE ON THE GROUND LEVEL, WILL
 REQUIRE VARIANCE/WAIVER FROM THE DAC.
 ZONING 8.19 - IF OPEN SPACE A2 IS NOT COUNTING TOWARD
 REQUIRED PRIVATE OR PUBLIC OPEN SPACE, DOES NOT NEED TO
 BE SHOWN ON L005.
  
  OPEN SPACE 4A ON SHEET L005 (GROUND LEVEL OPEN SPACE
 PLAN) DOES NOT MEET THE ACTIVE USE ABUTMENT REQUIRED
 (1SIDE OR 20%)
 ZONING 8.19 - [SATISFIED] RAILROAD ROW COUNTS TOWARD
 PUBLIC ROW ABUTMENT/OFFICE/RETAIL SATISFIES ACTIVE USE
 ABUTMENT
  
  OPEN SPACE 4A AND 48 ON SHEET L005 (GROUND LEVEL OPEN
 SPACE PLAN) TERRACE VEGETATED AREA REQUIREMENT IS 20%
 (OKAY TO EXCEED REQUIREMENT, PLEASE ADJUST TABLE TO
 CORRECTLY REFLECT REQUIREMENTS)
 ZONING 8.19 - [SATISFIED]
  
  OPEN SPACE 4A AND 48 ON SHEET L005 (GROUND LEVEL OPEN
 SPACE PLAN) SHOULD BE LABELED AS THE REQUIRED ROOFTOP
 GARDEN. MINIMUM REQUIREMENTS INCLUDE 50% VEGETATED AREA
 AND 50% TREE CANOPY.
 ZONING 8.19 - [SATISFIED] 4A AND 4B ARE TERRACES ON
 RESUBMITTED PLANS.
  
  STAFF IS UNABLE TO VERIFY COMPLIANCE UNTIL THE OPEN
 SPACES HAVE BEEN CORRECTLY DESIGNATED / IDENTIFIED AND
 PROPER REQUIREMTNS LISTED.
 ZONING 8.19 - [PARTIALLY SATISFIED] GROUND-LEVEL OPEN
 SPACES 1A, 1B, 1C CORRECTLY LABELED.
  
 ON SHEET L005, ROOF DECK IS NOT THE PROPER LABELING.
 ROOFTOP GARDEN IS A REQUIRED PRIVATE OPEN SPACE TYPE ON
 TABLE IV-6 FOR TOD-25 DISTRICT. PLEASE RELABEL
 ACCORDINGLY, REQUIRES 50% VEGETATED AND 50% TREE
 CANOPY.
  
 A. PROPOSED OPEN SPACE AT THE SOUTHERN TRIANGLE OF THE
 ITE DOES NOT MEET PUBLIC OR PRIVATE OPEN SPACE TYPOLOGY
 DUE TO LACK OF ABUTMENT TO AN ACTIVE USE [THIS IS A
 BONUS OPEN SPACE DESIGNED TO SERVE THE SFRTA AND ITC
 CUSTOMERS DURING OPERATING HOURS. THIS AREA ABUTS THE
 ACTIVE MASS TRANSIT USE TRAIN PLATFORM AND ITC FACILITY
 AND PROVIDES A SPACE FOR CUSTOMERS TO RELAX IN THE
 SUNNY LANDSCAPE PARKLIKE AREA WHILE WAITING TO MAKE
 THEIR TRANSIT CONNECTIONS.] [NOT SATISFIED]
  
 PER SECTION 94-109 OPEN SPACE, PRIVATE? IF PRIVATE OPEN
 SPACE IS LOCATED ON THE GROUND FLOOR AND LOCATED ALONG
 THE LOT FRONTAGE, IT SHALL BE DESIGNED IN COMPLIANCE
 WITH THE PUBLIC OPEN SPACE REQUIREMENTS, AND IT SHALL
 BE ACCESSIBLE BY THE PUBLIC FOR PUBLIC USE.
  
 TV JULY 19TH RESPONSE: THE GROUND LEVEL OPEN SPACES
 HAVE BEEN RELABELED AS GARDEN COURTYARD (SEE SHEETS
 L002 AND L005). THE OPEN SPACE REQUIREMENT IS MET ON
 THE GROUND LEVEL (SEE SHEETS L002, L005 AND L006). THE
 REMAINING OPEN SPACE IS A BONUS OPEN SPACE AREA AND IS
 NOT BEING USED TO MEET THE MINIMUM CODE REQUIREMENTS
 FOR REQUIRED OPEN SPACE.
 ZONING 8.19 - [SATISFIED] MIN. REQUIREMENTS FOR PUBLIC
 OPEN SPACE MET WITH GARDEN COURTYARDS ON 1A, 1B, 1C ON
 SHEET L005.
  
 B. THE PUBLIC OPEN SPACE SHOWN ON THE SECOND LEVEL
 REQUIRES THE APPROVAL OF A VARIANCE, SIMILAR TO THE ONE
 APPROVED AS PART OF THE CURRENTLY APPROVED SITE PLAN.
 [SEE ABOVE] [ACKNOWLEDGED. THIS WOULD ALLOW THE SAME
 RAISED OPEN SPACE CONDITION TO OCCUR AS PREVIOUSLY
 APPROVED] [NOT SATISFIED] WILL REQUIRE VARIANCE/WAIVER
 FROM THE DAC.
  
 TV JULY 19TH RESPONSE: THIS IS A BONUS OPEN SPACE AREA
 AND IS NOT BEING USED TO MEET THE MINIMUM CODE
 REQUIREMENTS FOR REQUIRED OPEN SPACE (SEE SHEETS L002,
 L005 AND L006).
 ZONING 8.19 - [SATISFIED] MIN. REQUIREMENTS FOR PUBLIC
 OPEN SPACE MET WITH GARDEN COURTYARDS ON 1A, 1B, 1C ON
 SHEET L005.
  
 15. STREET TREES: STREET TREES SHALL BE PLANTED AT 30
 FT. INTERVALS ALONG EACH STREET FRONTAGE. CLEARWATER
 FRONTAGE SHOULD HAVE APPROX. 46 TREES AND BANYAN
 FRONTAGE APPROX. 13 [NOTED STREET TREES CALCULATIONS
 HAVE BEEN UPDATED ACCORDINGLY] [SATISFIED]
 ZONING 8.19 - [NOT SATISFIED] BASED ON THE CHANGED SITE
 CONDITIONS AND PLANS WITHIN THE RESUBMITTED DRAWINGS,
 CLEARWATER DR. STREETSCAPE REQUIRES ~10 MORE STREET
 TREES ALONG THE SIDEWALK. PLACES TO ADD TREES INCLUDE
 ALONG ITC DROP-OFF, IN FRONT OF SPIRAL STAIRCASE, AND
 IN FRONT OF RESIDENTIAL LOBBY.
  
 16. PROPOSED RESIDENTIAL DROP-OFF AND LOOP FOR
 RESIDENTIAL TOWER ON CLEARWATER IS OUTSIDE OF PROPERTY
 LINES AND ENCROACHES INTO CITY ROW. ADDITIONAL SMALLER
 DROP-OFF ADJACENT TO LOADING BAY /BACK-OF-HOUSE. WHY
 ARE THESE DROP-OFF SPACES NEEDED FOR THE RESIDENTIAL
 TOWER? ADJACENT HOTEL/OFFICE ALSO INCLUDES A SMALL
 DROP-OFF, PRESENTS STACKING/QUEUING ISSUES AND SPILL
 OVER INTO CLEARWATER. STAFF DOES NOT SUPPORT THE
 RESIDENTIAL DROP-OFF ROAD ADJACENT TO RESIDENTIAL
 TOWER/CLEARWATER PROPOSED RESIDENTIAL DROP-OFF NOT IN
 COMPLIANCE. ENCROACHES INTO THE PUBLIC RIGHT-OF-WAY AND
 PER SEC. 4-111 (N. )(3.) DESIGNATED PASSENGER LOADING
 AND DROP-OFF AREAS SHALL BE SET BACK A MINIMUM OF 16
 FEET FROM THE BACK OF CURB, SHALL BE SEPARATED FROM THE
 SIDEWALK BY A 5 FOOT WIDE LANDSCAPE BUFFER AND SHALL BE
 SUBJECT TO APPROVAL BY THE CITY TRAFFIC ENGINEER. PORTE
 COCEHRES ARE SUBJECT TO MINIMUM STANDARDS DEPENDING ON
 SUBDISTRICT LOCATION AND ADJACENCY TO A STREET
 DESIGNATION AND ARE SEPARATED INTO TWO TYPES WHICH ARE
 ILLUSTRATED IN FIGURE IV-22. ONLY A TYPE A PORTE
 COCHERE IS ALLOWED IN THE TOD-25 SUBDISTRICT. [THIS
 DROP OFF LOOP FEATURE HAS BEEN REVISED AND APPROVED BY
 PBC SO THAT IT IS NO LONGER WITHIN THE RIGHT OF WAY AND
 ALSO TO ADD EXTRA SPACING FOR A VEGETATED BUFFER AND
 DROP OFF RELATED USES.] THANK YOU FOR CONSIDERATIONS
 AND REVISIONS FROM THE PREVIOUS SUBMITTAL, BASED UPON
 THE NEW PLANS PROVIDED: STAFF DOES NOT SUPPORT THE
 RESIDENTIAL DROP OFF FOR THE MIDDLE RESIDENTIAL TOWER
 ALONG CLEAR WATER. PROPOSED SEPARATE DROP OFF ROADWAY
 DOES NOT MAKE SENSE OPERATIONALLY AND DOES NOT REFLECT
 A SAFE / PLEASANT PEDESTRIAN ENVIRONMENT OR BUILT UP
 URBAN CONTEXT. CREATES A VEHICULAR-FOCUSED SPACE WITH
 NARROW LANDSCAPE BUFFER PEDESTRIANS ARE BOUNDED BY 2
 TRAVEL LANES. BUILDING WOULD BE BETTER ORIENTED CLOSER
 TOWARD CLEARWATER DR. ACTIVATING THE FRONTAGE, WITH THE
 DROP-OFF LOCATED AT THE REAR OF THE BUILDING, IN PLACE
 OF OR ALONG THE PROPOSED LOADING AREA. PROVIDES THE
 MOST DIRECT ROUTE INTO THE GARAGE FOR VALET SERVICES
 AND AVOIDS ADDITIONAL CIRCULATION. NEW CONFIGURATION
 WITH REVERSAL IN DIRECTION NOT EFFICIENT OR OPTIMAL. A
 TYPE A PORTE-COCHERE OFF CLEARWATER IS MORE COMPATIBLE
 AND APPROPRIATE FOR THIS SPACE, IF A DROP-OFF IS NEEDED
 ALONG THE RESIDENTIAL FRONTAGE. SIMILAR TO EXISTING ITC
 DROP-OFF IN FRONT OF HOTEL / OFFICE.
  
 A. INSTEAD, THE BUILDING FRONT SHOULD BE MOVED CLOSER
 TO CLEARWATER, AND RECONFIGURE LOADING AND BACK OF
 HOUSE TO INCLUDE THE DRIVEWAY AND DROP OFF AREA [SEE
 ABOVE COMMENT] SEE ABOVE.
 B. SEE ABOVE: PROPOSED LOADING SPACE ON RESIDENTIAL
 TOWER DOES NOT FUNCTION FOR VEHICULAR MOVEMENT. LOADING
 AREA WAS REVISED TO PROVIDE IMPROVED LOADING VEHICLE
 ACCESSIBILITY. SEE SHEET C-03] [NOT SATISFIED] PLEASE
 PROVIDE DIMENSIONS OF THE REVISED LOADING SPACES, ADA
 SPACE PROPOSED IN BETWEEN LOADING OPERATIONS
  
 TV JULY 19TH RESPONSE: TV HAS REVISED THE PLANS TO
 ELIMINATE THE WESTERN OUTSIDE DRIVE LANE TO ACCOMMODATE
 THESE COMMENTS. THERE WILL BE A PEDESTRIAN ENTRANCE
 ALONG CLEARWATER AND PEDESTRIAN AND VEHICLE DROPOFF AT
 THE REAR OF THE BUILDING. SEE SHEET A4-01 FOR NEW
 DESIGN.
 ZONING 8.19 - [SATISFIED]
  
 WHAT IS THE DISTANCE BETWEEN THE INTERSECTION OF
 CLEARWATER TO THE REVISED HOTEL/OFFICE DROP-OFF LOADING
 SPACE?
  
 TV JULY 19TH RESPONSE: THE DISTANCE IS 50.88 FEET.
 ZONING 8.19 - [SATISFIED] 50FT. MINIMUM MAINTAINED
  
 17. ITC BUS LOOP IS NOW ENTIRELY COVERED OVERHEAD BY
 PLAZA AND BUILDINGS/STRUCTURES. PREVIOUS DESIGN HAD AN
 OPEN AIR CORRIDOR TO PROVIDE LIGHT, LANDSCAPING, AND
 VENTILATION / OPEN AIR ACCESS. HOW WILL THE REMOVAL OF
 THESE ELEMENTS BE MITIGATED OR COMPENSATED FOR OR TO
 PROVIDE LIGHT, LANDSCAPING, AND VENTILATION /OPEN-AIR
 ACCESS. HOW WILL THE REMOVAL OF THESE ELEMENTS BE
 MITIGATED OR COMPENSATED FOR ESPECIALLY WHERE ANY
 MECHANICAL VENTING WILL BE LOCATED? [THE ITC IS NOW
 COMPLETELY ENCLOSED UNDER AND WITHIN THE PARKING
 STRUCTURE. A NEW LANDSCAPED OPEN SPACE IS PROVIDED
 ADJACENT TO THE SOUTH END OF THE ITC. THIS AREA IS
 ACCESSIBLE TO TRANSIT PATRONS SO THEY CAN GET SUN OR
 SIT IN SHADE WITHIN A LANDSCAPE AREA WHILE WAITING FOR
 THEIR TRANSIT CONNECTION] [PARTIALLY SATISFIED] NOTE,
 PER SECTION 94-109 OPEN SPACE, PRIVATE ? IF PRIVATE
 OPEN SPACE IS LOCATED ON THE GROUND_ FLOOR AND LOCATED
 ALONG THE LOT FRONTAGE, IT SHALL BE DESIGNED IN
 COMPLIANCE WITH THE PUBLIC OPEN SPACE REQUIREMENTS, AND
 IT SHALL BE ACCESSIBLE BY THE PUBLIC FOR PUBLIC USE.
  
 TV JULY 19TH RESPONSE: THIS IS A BONUS OPEN SPACE AREA
 AND IS NOT BEING USED TO MEET THE MINIMUM CODE
 REQUIREMENTS. PLEASE NOTE THAT THE ITC IS NOT
 COMPLETELY ENCLOSED, AND IS OPEN TO THE EAST, WEST AND
 SOUTH.
 ZONING 8.19 - [SATISFIED] MIN. REQUIREMENTS FOR PUBLIC
 OPEN SPACE MET WITH GARDEN COURTYARDS ON 1A, 1B, 1C ON
 SHEET L005.
  
 18. PLEASE PROVIDE SHEETS AND DRAWINGS IDENTIFYING HOW
 THE FACADE ARTICULATION REQUIREMENTS ARE MET FOR THE
 PROJECT. PLEASE REFERENCE SEC. 94-109 AND TABLE IV-4:
 FACADE ARCHITECTURAL REQUIREMENTS. [PLANAR BREAKS AND
 BUILDING LENGTH DIAGRAMS ARE PROVIDED] [PARTIALLY
 SATISFIED] DIAGRAMS ARE PROVIDED A. ILLUSTRATE
 TRANSPARENCY CALCULATIONS, FENESTRATION CALCULATIONS,
 PLANAR BREAK CALCULATIONS, PROJECTIONS, ETC. FOR ALL
 BUILDING FACADES. [TRANSPARENCY, FENESTRATION, PLANAR
 BREAK CALCULATIONS, FOR ALL BUILDING FACADES PROVIDED.]
 [NOT SATISFIED] FOR GROUND FLOOR TO PODIUM (UP TO 7TH
 FLOOR IN TOD-25 DISTRICT
  
 TV JULY 19TH RESPONSE: THE PLANAR BREAKS DIAGRAMS HAVE
 BEEN AMENDED TO SHOW COMPLIANCE SUBJECT TO A VARIANCE
 REQUEST FOR GROUND TO LEVEL 7 TO MATCH ARTICULATION OF
 TOWER ABOVE (SEE SHEETS A5-04, A5-05, A5-06 AND A5-07).
  
 ZONING 8.19 - [NOT SATISFIED] PLANAR BREAKS ARE
 REQUIRED FOR THE BUILDING FRONTAGES (SIDE FACING STREET
 OR ROW) FOR BUILDINGS THAT EXCEED 150 LINEAR FT. THE
 REQUIREMENT IS TO PROVIDE A PROJECTION, PROTRUSION, OR
 RECESS IN THE FA?ADE THAT IS AT LEAST 3FT. IN DEPTH.
 THE CUMULATIVE HORIZONTAL LENGTH OF THE PLANAR BREAKS,
 PER BUILDING FRONTAGE, SHALL BE GREATER OR EQUAL TO 20%
 OF THE BUILDING FRONTAGE.
  
 SHEET A5-04 PLANAR BREAK NEEDED FOR 243FT. BANYAN
 FRONTAGE (20% HORIZONTAL TOTAL FOR PLANAR BREAK NEEDS
 TO BE GREATER THAN OR EQUAL TO 48.5 FT.)
  
 PLEASE CLARIFY VARIANCE REQUEST, JUSTIFICATION IS
 UNCLEAR AS TO WHAT THE VARIANCE IS FROM OR FOR. WHAT
 4FT. PLANAR BREAKS ARE BEING ELIMINATED? BANYAN
 FRONTAGE ALSO DOES NOT HAVE A RECESSED GROUND FLOOR.
 WHAT TOWERS ARE MIDDLE & WEST?
  
  
 SHEET A5-05 PLANAR BREAK NEEDED FOR 223FT. CLEARWATER
 FRONTAGE (20% HORIZONTAL TOTAL FOR PLANAR BREAK NEEDS
 TO BE GREATER THAN OR EQUAL TO 44.5 FT.)
  
 PLEASE CLARIFY VARIANCE REQUEST, JUSTIFICATION IS
 UNCLEAR AS TO WHAT THE VARIANCE IS FROM OR FOR. WHAT
 4FT. PLANAR BREAKS ARE BEING ELIMINATED? CLEARWATER
 FRONTAGE ALSO DOES NOT HAVE A RECESSED GROUND FLOOR.
 WHAT TOWERS ARE MIDDLE & WEST?
  
  
 SHEET A5-06 PLANAR BREAK FOR THE GROUND LEVEL NEEDED
 FOR 204?-10?FT. CLEARWATER FRONTAGE (20% HORIZONTAL
 TOTAL FOR PLANAR BREAK NEEDS TO BE GREATER THAN OR
 EQUAL TO 41 FT.)
  
 SHEET A5-06 PLANAR BREAK FOR THE PODIUM NEEDED FOR
 223FT. CLEARWATER FRONTAGE (20% HORIZONTAL TOTAL FOR
 PLANAR BREAK NEEDS TO BE GREATER THAN OR EQUAL TO 44.5
 FT.)
  
 PLEASE CLARIFY VARIANCE REQUEST, JUSTIFICATION IS
 UNCLEAR AS TO WHAT THE VARIANCE IS FROM OR FOR. WHAT
 4FT. PLANAR BREAKS ARE BEING ELIMINATED? WHAT TOWERS
 ARE MIDDLE & WEST?
  
 SHEET A5-07 BUILDING FRONTAGE AND MASS FOR THE
 OFFICE/HOTEL DOES NOT CREATE A CONTINUOUS 150 FT.
 FA?ADE WHICH WOULD REQUIRE A PLANAR BREAK. THE BUILDING
 IS ALREADY BROKEN UP INTO THREE SEPARATE PLANES/FACES.
  
 SHEET A5-05, A5-06, BALCONIES FOR THE RESIDENTIAL
 BUILDINGS DO NOT CONSTITUTE AS PLANAR BREAKS, AS THESE
 ARE JUST PUNCH OUTS ALONG THE SAME BUILDING FACE.
 PORTIONS OF THE FACADE ITSELF NEEDS TO BE RECESSED OR
 PROTRUDE TO A DEPTH OF AT LEAST 3 FT.
  
 TV JULY 19TH RESPONSE: ACKNOWLEDGED
  
 ZONING 8.19 - [REPEAT FROM ABOVE]
  
 SHEET A-5-07 SATISFIES PLANAR BREAK REQUIREMENTS.
  
 PLEASE PROVIDE MORE DETAIL FOR THE GARAGE SCREENING. IS
 THE GREEN-WALL LIVING PLANT MATERIAL; IF SO WHAT KIND
 OF PLANTS ARE PROVIDED/HOW IS THIS
 MAINTAINED/IRRIGATED? ARE THE GREEN-WALL SECTIONS
 RECESSED.FROM THE METAL SCREENING?
  
 TV JULY 19TH RESPONSE: THE GARAGE SCREENING HAS BEEN
 REVISED AND IS A COMBINATION OF METAL SCREENING WITH AN
 ETCHED DESIGN AND WITH LIVING PLANT MATERIAL. SEE
 SHEETS A5-08.
  
 ZONING 8.19 - [NOT SATISFIED] SHEETS ARE NOT REVISED.
 REPEAT OF PREVIOUS COMMENT.
  
 TRANSPARENCY REQUIREMENTS APPEAR TO BE MET BASED UPON
 ELEVATIONS PROVIDED. PLEASE PROVIDE CALCULATIONS WITHIN
 TABLE OR ON DRAWINGS.
  
 TV JULY 19TH RESPONSE: THE GROUND FLOOR IS
 SUBSTANTIALLY ALL GLASS. SEE SHEETS A4-22, A4-23,
 A4-24, A4-25, A4-26 AND A4-27.
 ZONING 8.19 - [NOT SATISFIED] REPEAT OF PREVIOUS
 COMMENT. IT IS UNDERSTOOD THE GROUNDFLOOR IS
 SUBSTANTIALLY GLASS, HOWEVER PERCENTAGES SHOULD BE
 PROVIDED SHOWING COMPLIANCE.
  
 19. PLEASE PROVIDE DETAILS AND MATERIALS OF THE GARAGE
 STRUCTURE, HOW IS IT BEING SCREENED, MATERIALS, PLANTS,
 ETC. [GENERAL SPECIFICATION FOR GARAGE FACADE SCREENING
 MATERIALS ADDED TO ELEVATIONS] PLEASE PROVIDE MORE
 DETAIL FOR THE GARAGE SCREENING. IS THE GREEN WALL
 LIVING PLANT MATERIAL; IF SO WHAT KIND OF PLANTS ARE
 PROVIDED/HOW IS THIS MAINTAINED/IRRIGATED? ARE THE
 GREEN-WALL SECTIONS RECESSED FROM THE METAL SCREENING?
 ARE THERE OTHER RECESSED PORTIONS/PLANAR BREAKS WITHIN
 THE SCREENING TO REAK UP THE MASS? PLEASE PROVIDE MORE
 DETAIL INTO SCREENING GRAPHIC, COLOR, & TREATMENT.
  
 TV JULY 19TH RESPONSE: REPEAT SEE RESPONSE ABOVE
 ZONING 8.19 - [NOT SATISFIED] SHEETS ARE NOT REVISED.
 REPEAT OF PREVIOUS COMMENT.
  
 20. REGARDING THE ARCHITECTURAL DESIGN OF THE TOWERS,
 HAS VARIED FACADES AND ELEMENTS BEEN EXPLORED OR IS
 THERE A REASON FOR UNVARIED/SIMILARLY DESIGNED TOWERS?
 [THE PROPOSED PROJECT DESIGN WAS CREATED AND EXECUTED
 PERSONALLY BY ARCHITECT BERNARDO FORT-BRESCIA OF
 ARQUITECTONICA. THE PROJECT DESIGN IS EXTREMELY WELL
 BALANCED WHILE REPRESENTING ARQ'S SIGNATURE MODERN
 STYLIZATION THROUGHOUT THE COHESIVE DESIGN] NOTED.
 PREVIOUS APPROVAL FOR TRANSIT VILLAGE HAD INCORPORATED
 FAR MORE VARIATION IN MASSING AND ARCHITECTURAL
 FEATURES THAT RESPECTED THE CONTEXT OF THE SURROUNDING
 BUILT ENVIRONMENT AND HISTORIC ELEMENTS ADJACENT TO THE
 SITE.
  
  -GARAGE SCREENING PRESENTS A STARK CONTRAST BETWEEN
 THE HISTORIC SEABOARD TRAIN STATION AND PRESENTS AN
 OPPORTUNITY TO EXPLORE ALTERNATIVE COLOR SCHEMES,
 SCREENING/MESH, GRAPHICS, RECESSES/PROTRUSIONS, ETC.
 WITHIN ITS DESIGN. THE GARAGE SCREENING SHOULD RESPECT
 OR PRESENT THESE SPACES IN A MORE COHESIVE MANNER.
 CURRENTLY THE TRAIN-STATION SITS IN FRONT OF A
 MASSIVELOCKY BACKDROP AND GETS LOST.
  
 -THE WATER TREATMENT FACILITY ON BANYAN IS ALSO AN
 HISTORIC SITE WITHIN THE SHADOW OF THE RESIDENTIAL
 TOWER. PREVIOUS APPROVAL FEATURED A STEP-BACK OR
 STAIRCASE MASSING TO LOWER THE SCALE TOWARD
 BANYAN/WATER TREATMENT FACILITY, AND THE TRAIN STATION
 ALONG TAMARIND. RECOMMEND PURSUING A SIMILAR CONCEPT TO
 BETTER SCALE AND FRAME THE MASSING.
  
 -REGARDING THE HOTEL/OFFICE TOWER, PREVIOUS
 APPROVALPROVIDED ADDITIONAL SPACING AND STEPPED BACK
 FURTHER FROM THE SEABOARD TRAIN STATION, PROVIDING A
 MORE APPROPRIATELY SCALED PEDESTRIAN ENVIRONMENT THAT
 DIDN?T OVERSHADOW THE HISTORIC BUILDING BELOW.
 ADDITIONALLY, THE BLUE FACADE TREATMENT OR PAINTING IS
 ANOTHER STARK CONTRAST TO THE TRAIN STATION, PLEASE
 EXPLORE MORE OMPATIBLE COLOR SCHEMES (E.G. EARTH TONES)
  
 TV JULY 19TH RESPONSE: WE HAVE REVISED THE COLOR
 SCHEME. WE ARE WELL AWARE OF THE HISTORIC NATURE OF THE
 TRAIN STATION BUILDING AND NOTE THAT ALL OF THE TV
 TOWERS ARE AT LEAST 250 FEET FROM THE TRAIN STATION
 BUILDING. GIVEN THE ODD SHAPE OF THE PROPERTY AND OUR
 LIMITATIONS WITH SETBACKS, WE BELIEVE THAT WE HAVE
 DESIGNED A PROJECT THAT WORKS AS WELL AS POSSIBLE WITH
 THE SURROUNDING AREA. NOTE THAT CONTRASTING COLORS ARE
 OFTEN UTILIZED NEXT TO HISTORIC STRUCTURES.
  
 ZONING 8.19 - [ACKNOWLEDGED] THANK YOU FOR PROVIDING A
 COLOR SCHEME CHANGE. CONTRASTING COLORS ARE OFTEN
 UTILIZED IN ORDER TO HIGHLIGHT FEATURES OR TO
 DIFFERENTIATE STRUCTURES OR ELEMENTS AS SEPARATE
 ENTITIES; IN THIS CASE, THE HISTORIC TRAIN STATION IS
 IN DIRECT RELATIONSHIP TO THE PROJECT AS A WHOLE AND
 ITS GROUND LEVEL, HENCE THE ASK FOR A MORE COMPATIBLE
 DESIGN ALTERNATIVES WITH MASSING, MATERIAL, COLOR, ETC.
 BETWEEN THESE ELEMENTS.
  
 DESIGN IS GENERALLY WITHIN BUILDING REQUIREMENTS AND
 REGULATORY PARAMETERS, STAFF RESPECTFULLY SUGGESTED
 DESIGN ALTERATIONS TO KEEP WITH THE DISTRICTS INTENT OF
 EXEMPLARY AND ENVIRONMENTALLY RESPONSIVE
 BUILDINGS/INFRASTRUCTURE; AS WELL AS THE TWO SPECIFIC
 CONDITIONS OF DAC SPECIAL REVIEW: (A.) RELATIONSHIP OF
 BUILDING TO SITE AND SURROUNDINGS; AND (C.) BUILDING
 DESIGN.
  
 PLANNING AND HISTORIC PRESERVATION STAFF RESPECTFULLY
 ASKS AGAIN FOR ADDITIONAL INFORMATION REGARDING THE
 SCREENING AND TREATMENT OF THE GARAGE, AS THIS IS A
 SIGNIFICANT PORTION OF THE PROJECT?S PODIUM AND IS
 VISIBLE FROM ALL SIDES. WILL THE SCREENING BE LIVING
 PLANT MATERIAL? IF SO, PLEASE PROVIDE DETAILS WITHIN A
 SEPARATE LANDSCAPE SHEET OR AS PART OF A5-08. PLEASE
 CLARIFY HOW THIS WILL BE MAINTAINED AND IRRIGATED; ARE
 THE SCREEN SECTIONS FLUSH TO THE GREEN WALL SECTIONS,
 ARE THERE RECESSES OR PROJECTIONS? WITH THE METAL
 SCREENING, HAS THERE BEEN DISCUSSION AS TO WHAT DESIGN
 WILL BE PRINTED/ETCHED ONTO THE FA?ADE? HAVE MATERIAL
 ALTERNATIVES, FENESTRATION, FA?ADE ARTICULATION,
 ARCHITECTURAL TREATMENTS, OR LININGS THAT ARE MORE
 ACTIVE BEEN EXPLORED? PREVIOUS APPROVAL HAD
 SIGNIFICANTLY LESS SCREENING FOR A HIGHER PARKING
 STRUCTURE.
  
 REGARDING THE NORTHERN/BANYAN OFFICE TOWER, PLANNING
 AND HISTORIC PRESERVATION STAFF ARE STILL CONCERNED
 WITH THE GENERAL MASSING OF THE STRUCTURE IN
 RELATIONSHIP TO THE PROJECT SITE, HISTORIC TRAIN
 STATION/TREATMENT FACILITY, AND BANYAN INTERSECTION.
 THE BUILDING?S GENERAL HEIGHT AND MASS IS AN IMPOSING
 STRUCTURE FOR THIS PORTION OF THE SITE. THE CURRENT
 DESIGN AND PERSPECTIVE RENDER ON SHEET A9-03 PRESENTS A
 BUILDING FRONTAGE THAT CREATES A WALL-LIKE CONDITION,
 ESPECIALLY WITH A FA?ADE THAT CONTAINS NO FA?ADE
 ARTICULATION OR PLANAR BREAKS. WITHOUT THE REQUESTED
 STEP-BACKS, THE FRONTAGE ALONG BANYAN IS A VERY STARK
 CONTRAST FROM LOW-SCALE TO HIGH. STAFF REFERENCES THE
 PREVIOUS APPROVAL, AS IT HAD FEATURED A STEP-BACK OR
 TIERED ?STAIRCASE? MASSING TO PROGRESSIVELY LOWER THE
 SCALE TOWARD BANYAN AND RESPECT THE WATER TREATMENT
 FACILITY AND TRAIN STATION. STAFF RECOMMENDS PURSUING A
 SIMILAR DESIGN CONCEPT TO MORE APPROPRIATELY SCALE THE
 BUILDING AND FRAME THE SITE.
  
 21. REGARDING THE TOWERS AND OVERALL PROJECT HEIGHT,
 STAFF REQUESTS THAT THE BANYAN RESIDENTIAL TOWER IS THE
 TALLEST RATHER THAN THE CLEARWATER HOTEL/OFFICE TOWER.
 THIS IS BECAUSE BANYAN IS THE WIDEST ROADWAY AND IS
 MORE APPROPRIATELY FRAMED/CAN ACCOMMODATE THE TALLER
 MASS. ADDITIONALLY, STAFF RECOMMENDS THAT THE BANYAN
 RESIDENTIAL TOWER STEPS DOWN IN SOME CAPACITY TOWARD
 TAMARIND AVE. AS WAS APPROVED WITHIN THE ORIGINAL SITE
 PLAN. THIS GIVES RESPECT TO THE SCALE OF THE SEABOARD
 TRAIN STATION AND PUBLIC REALM ALONG TAMARIND.
 [ACKNOWLEDGED BUT WE DO NOT AGREE WITH THE PROPOSED
 DESIGN SUGGESTIONS] SEE PREVIOUS COMMENT.
  
 TV JULY 19TH RESPONSE: EACH TOWER IS WITHIN THE ALLOWED
 HEIGHT AND WE NOTE THAT THE SOUTHERN HOTEL/OFFICE TOWER
 ALIGNS WITH FERN AND EVERNIA, OVER THREE BLOCKS FROM
 BANYAN.
  
 ZONING 8.19 - [ACKNOWLEDGED] SEE PREVIOUS COMMENT.
  
 22. BE COGNIZANT THAT THE EDGE 2 BUILDING LOCATED AT
 300 CLEARWATER IS APPROVED AND UNDERGOING BUILDING
 PERMITTING PROCESS, THIS PROJECT?S INGRESS/EGRESS FROM
 DRIVES MAY PRESENT CONFLICT POINTS. THE GROUND LEVEL
 PLANS NEED TO SHOW THE EDGE 2 CURB CUTS IN ORDER FOR
 STAFF TO EVALUATE THE IMPACT OF THE ACCESS POINTS TO
 CLEARWATER. ADDITIONALLY, THE PEDESTR.IAN CONNECTION
 FROM THE OASIS PARK ELEMENT ACROSS CLEARWATER TO THE
 STAIRWELL/ELEVATOR FOR THE UPPER PLAZA WILL NEED
 RECONSIDERATION WITH THE INCOMING DEVELOPMENT. [WE WILL
 COORDINATE PROJECT FEATURES AS NEEDED] [PARTIALLY
 SATISFIED] THANK YOU FOR OVERLAYING PORTIONS OF THE
 ADJACENT PROPERTIES/ROW CONTEXT. THE CURB CUTS OR EDGE
 2 BUILDING ACROSS FROM SITE NEED TO BE REVISED AND
 REALIGNED TO ACCURATELY REFLECT CONDITIONS.
  
 TV JULY 19TH RESPONSE: THE 350 AND EDGE CURB CUTS ARE
 ACCURATELY PROVIDED ON THE PLANS, WE NOTE THAT THE
 APPROVED SITE PLAN FOR TV PREDATED THE RECENT APPROVAL
 FOR 300 CLEARWATER/EDGE 2.
  ZONING 8.19 - [SATISFIED]
  
 23. PLEASE CLARIFY GROUND FLOOR PEDESTRIAN CIRCULATION
 WITH ITC, ACCESSING UPPER PLAZA SPACES, AND INTERNAL
 CIRCULATION BETWEEN RETAIL AND RESIDENTIAL TOWERS. IS
 THE ITC BUS LOOP SEPARATED/CLOSED OFF IN THE EVENINGS
 WHEN BUS OPERATIONS HALT, HOW IS WAYFINDING ADDRESSED
 TO ACCESS THE UPPER PLAZA SPACES? [PATRONS WILL BE
 QUEUED BY FENCING, GATES, LIGHTING, AND WAY FINDING
 SIGNAGE] [NOT SATISFIED] IS THE INTENTION FOR GENERAL
 PUBLIC TO ACCESS REST OF SITE/RETAIL VIA ELEVATORS
 THROUGH THE RESIDENTIAL TOWERS?
  
  REPEAT COMMENT PORTION OF (9.J.IV.A.) PLEASE PROVIDE
 CLARIFICATION OF HOW GENERAL PUBLIC/USERS OF OFFICE,
 HOTEL, RETAIL, AND TRI-RAIL USERS WILL EFFICENTLY
 ACCESS THESE FACILITIES FROM THE GARAGE.
  
 TV JULY 19TH RESPONSE: REPEAT SEE ABOVE.
  
  DRAWINGS INDICATE THAT THE CROSS-WALK FROM THE
 SOUTHERN SIDE OF THE HOTEL/OFFICE TOWER STILL
 EXISTS/WILL REMAIN. PLEASE ADJUST PLANS/DRAWINGS
 ACCORDINGLY. PLEASE PROVIDE JUSTIFICATION /
 CLARIFICATION OF WHY THIS CROSSWALK IS BEING REMOVED.
  
 TV JULY 19TH RESPONSE: CROSS WALKS ARE NOT TO BE
 REMOVED AND TO REMAIN AS IS. THE LABELING HAS BEEN
 REVISED TO PROVIDE THIS CLARIFICATION.
 ZONING 8.19 - [SATISFIED]
  
  PLEASE PROVIDE ELEVATIONS / RENDERS OF THE PROPOSED
 SPIRAL STAIRCASE/ELEVATOR ON CLEARWATER DR. FOR THE
 UPPER PLAZA. PUBLIC ACCESS TO UPPER PLAZA FROM THIS
 STAIRCASE IS NOT OBVIOUS; PLEASE PROVIDE ADDITIONAL
 CONTEXT DISPLAYING THIS ENTRANCE.
  
 TV JULY 19TH RESPONSE: ADDITIONAL DETAIL IS PROVIDED ON
 SHEET A5-11.
  ZONING 8.19 - [SATISFIED]
  
  STAFF SUGGESTS AN ADDITIONAL STAIRWELL OR ACCESS POINT
 FROM THE SOUTHERN END OF THE OFFICE/HOTEL TOWER FROM
 THE DECK/PLAZA TO PROVIDE ADDITION CIRCULATION BETWEEN
 ITC / SFRTA AND UPPER PLAZA.
  
 TV JULY 19TH RESPONSE: THE SPIRAL STAIRCASE AND
 ELEVATOR ON CLEARWATER PROVIDES SUBSTANTIAL PROMINENCE
 AND ACCESS TO AND FROM THE PLAZA. THE PLAZA ALSO IS
 ACCESSED FROM THE PEDESTRIAN BRIDGE AND A NEW STAIRWAY
 TO THE TRI-RAIL AMTRAK PLATFORM . THERE IS NO
 CONNECTION POINT FOR AN ADDITIONAL STAIRWELL AT THE
 SOUTHERN END OF THE PLAZA AS THERE IS NO GROUND PUBLIC
 ACCESS POINT BELOW .
  ZONING 8.19 - [ACKNOWLEDGED]
  
 A. THE ITC ADA PATH DRAWING SUBMITTED WITH THE
 APPLICATION SHOWS THE ADA ROUTE UTILIZING A CROSSWALK
 THAT IS DESIGNATED FOR REMOVAL. [THE ADA PATHWAY AND
 CROSSWALK WILL BE REMOVED PURSUANT TO THE COUNTY
 REQUEST TO REMOVE THEM FROM THE ITC.] [NOT SATISFIED]
 DRAWINGS INDICATE THAT THE CROSS-WALK FROM THE SOUTHERN
 SIDE OF THE HOTEL/OFFICE TOWER STILL EXISTS/WILL
 REMAIN. PLEASE ADJUST PLANS/DRAWINGS ACCORDINGLY.
 PLEASE PROVIDE JUSTIFICATION/CLARIFICATION OF WHY THIS
 CROSSWALK IS BEING REMOVED.
  
 TV JULY 19TH RESPONSE: CORRECTING THE PRIOR RESPONSE,
 THIS CROSSWALK IS NOT BEING REMOVED AND TO REMAIN AS IS
 AT THE ELECTION OF PALM TRAN. THE LABELING HAS BEEN
 REVISED TO ELIMINATE THE LANGUAGE ABOUT REMOVAL.
 ZONING 8.19 - [SATISFIED]
  
 B. THE ITC FENCE EXHIBIT SHOWS THE FENCE AROUND THE
 OPEN SPACE AT THE SOUTH END OF THE SITE AS A PRIVATE
 PARK FENCE. THIS DOES NOT MATCH THIS AS BEING DEPICTED
 AS PUBLIC OPEN SPACE ON OTHER PLANS. [THIS IS A BONUS
 OPEN SPACE AREA DESIGNED TO BE OPERATED IN CONJUNCTION
 WITH THE SFRTA PLATFORM AND ITC OPERATION. THIS AREA
 WILL BE CLOSED TO PUBLIC ACCESS WHEN THE ITC IS CLOSED]
 [NOT SATISFIED] PER SECTION 94-109 OPEN SPACE, PRIVATE.
 IF PRIVATE OPEN SPACE IS LOCATED ON THE GROUND FLOOR
 AND LOCATED ALONG THE LOT FRONTAGE, IT SHALL BE
 DESIGNED IN COMPLIANCE WITH THE PUBLIC OPEN SPACE
 REQUIREMENTS, AND IT SHALL BE ACCESSIBLE BY THE PUBLIC
 FOR PUBLIC USE.
  
 TV JULY 19TH RESPONSE: TO CORRECT OUR PRIOR RESPONSE,
 THIS SPACE WILL NOT BE DIRECTLY ACCESSIBLE FROM THE
 TRAIN PLATFORM OR THE ITC AS ACCESS WILL ONLY BE FROM
 CLEARWATER. THE SPACE WILL NOT BE OPERATED IN
 CONJUNCTION WITH MASS TRANSIT BUT WILL BE ACCESSIBLE BY
 THE PUBLIC FOR PUBLIC USE.
 ZONING 8.19 - [SATISFIED] WILL THE GATES BE OPEN 24/7
 OR CLOSE DURING CERTAIN HOURS?
  
  
 24. STAFF WILL BE RECOMMENDING PEDESTRIAN IMPROVEMENTS
 AND INCREASED ACCESSIBILITY TO TAMARIND AND THE
 DOWNTOWN AREA. AS A TOD PROJECT, YOU MUST DEMONSTRATE
 HOW THE RELATION AND CONNECTIVITY IS IMPROVED TO THESE
 CORRIDORS INTO THE DOWNTOWN. RECOMMEND POTENTIAL: WORK
 WITH SFRTA TO IMPLEMENT AT-GRADE CONNECTION(S) ACROSS
 RAILS TO TAMARIND. IMPROVE THE PEDESTRIAN BRIDGE
 CONNECTING SEABOARD TRAIN STATION AND TRANSIT VILLAGE
 PROJECT. EXPLORE CONCEPT OF ADDITIONAL PEDESTRIAN
 BRIDGES OR CONNECTIONS. [THE REVISED PROJECT DESIGN
 PROVIDES ACCESSIBILITY TO THE GARAGE, RETAIL, BIKE
 STORAGE, ITC AND RAIL FACILITIES FROM BOTH BANYAN
 BOULEVARD AND CLEARWATER DRIVE. THESE ACCESS POINTS ARE
 PROVIDED UNDER COVERED WALKWAYS AND THEY HAVE ACTIVE
 USES PROVIDED ALONG THEIR FRONTAGES. THE NEW ACCESS
 POINT FROM BANYAN ALONG THE WEST SIDE OF THE TRACKS NOW
 PROVIDES A DIRECT ROUTE BACK TOWARD BANYAN BOULEVARD]
 [NOT SATISFIED] PLEASE CLARIFY OR MARK ON PLANS THE NEW
 ACCESS POINT FROM BANYAN. NOT UNDERSTANDING THE
 INCREASED ACCESSIBILITY AND PEDESTRIAN IMPROVEMENT
 DESCRIBED. ADDITIONALLY STAFF RECOMMENDS AN ADDITIONAL
 STAIRWELL OR ACCESS POINT FROM THE SOUTHERN END OF THE
 OFFICE/HOTEL TOWER FROM THE DECK/PLAZA TO PROVIDE
 ADDITIONAL CIRCULATION BETWEEN ITC/SFRTA AND UPPER
 PLAZA.
  
 TV JULY 19TH RESPONSE: SEE RESPONSES ABOVE. THE BANYAN
 ACCESS IS DIRECTLY WEST OF THE TRACKS. PLEASE NOTE THAT
 THE AMENDED SITE PLAN HAS BEEN APPROVED BY THE SFRTA
 (TRI-RAIL), THE COUNTY (PALM TRAN) AND THAT THE PSA WAS
 APPROVED BY THE FTA. TV BELIEVES THAT IT IS VERY
 SUPPORTIVE OF THE TOD CONCEPT AS IT HAS ELEMENTS
 CONTAINING LIVE/WORK/PLAY/SHOP DIRECTLY ABOVE MASS
 TRANSIT AND CONNECTS THE SEABOARD TRAIN STATION AND
 TRI-RAIL, AMTRAK, PALM TRAN, GREYHOUND AND THE CITY
 TROLLEY TO THE AMENITY RETAIL PLAZA.
  
 25. PLEASE PROVIDE INFORMATION ON WHAT THE MOTOR LOBBY?
 IS. [IT IS SMALL LOBBY FOR THE OFFICE AND HOTEL AT THE
 GROUND LEVEL INTENDED TO PROVIDE GROUND FLOOR ACCESS TO
 VEHICLES PICKING UP AND DROPPING OFF PATRONS, MAIL
 PACKAGES, LUGGAGE, ETC.] [SATISFIED]
  
 26. THE SOUTH RESIDENTIAL BUILDING IS NOT PERMITTED TO
 ENCROACH THE 20-FOOT FIRE DEPARTMENT ACCESS EASEMENT.
 NOTE: EVEN WITHOUT THE BUILDING ENCROACHMENT, THIS DOES
 NOT FUNCTION. [THIS FIRE ACCESS IS NOT REQUIRED AND IS
 PROPOSED TO BE REMOVED] [NOT SATISFIED] PLEASE PROVIDE
 EVIDENCE OF EASEMENT REMOVAL AND FIRE DEPT. APPROVAL.
  
 TV JULY 19TH RESPONSE: EASEMENTS WILL EITHER BE
 ABANDONED OR RELOCATED PRIOR TO PERMIT. FIRE ACCESS
 WHICH ARE NOT REQUIRED HAVE BEEN REMOVED.
 ZONING 8.19 - [SATISFIED]
  
 27. PROVIDE TURNING DIAGRAMS FOR THE LOADING AREAS
 UNDER THE NORTH BUILDING, ENTRY POINTS TO THE SITE AND
 THE OTHER LOADING AREAS. [AUTO TURN EXHIBITS PROVIDED]
 BASED UPON THE AUTOTURNS PROVIDED:
 [NOT SATISFIED] PLEASE PROVIDE JUSTIFICATION FOR DOUBLE
 INGRESS RAMP AND DOUBLE EGRESS RAMP.
  
 TV JULY 19TH RESPONSE: REPEAT SEE RESPONSES ABOVE.
 ZONING 8.19 - [ACKNOWLEDGED] MANAGEMENT PLAN FOR
 LOADING/ACCESS TO BE INCLUDED PRIOR TO SITE PLAN
 APPROVAL.
  
 GROUND LEVEL LOADING BAYS AND OPERATION CREATES CLEAR
 CONFLICT POINTS AND IS A TRAFFIC/SAFETY HAZARD WITH
 INGRESS/EGRESS OF PATRONS TO THE UPPER LEVELS OF THE
 GARAGE AND GROUND LEVEL ADA ACCESS. QUEUING AND
 SPILLBACK IS AN INEVITABILITY DURING OPERATIONAL HOURS.
  
 TV JULY 19TH RESPONSE: REPEAT SEE RESPONSES ABOVE.
 ZONING 8.19 - [ACKNOWLEDGED] MANAGEMENT PLAN FOR
 LOADING/ACCESS TO BE INCLUDED AS A CONDITION OF SITE
 PLAN APPROVAL.
  
 AUTOTURN FOR DELIVERIES POSES CONFLICT POINTS WITH ADA
 AND OTHER OPERATIONS INTERSECTS WITH DOWNWARD RAMP.
  
 TV JULY 19TH RESPONSE: REPEAT SEE RESPONSES ABOVE.
 ZONING 8.19 - [ACKNOWLEDGED] MANAGEMENT PLAN FOR
 LOADING/ACCESS TO BE INCLUDED PRIOR TO SITE PLAN
 APPROVAL.
  
 INTERNAL GARAGE CIRCULATION ALTERNATING ACROSS LEVELS
 WITH ONE-WAY /TWO-WAY AISLES POSES CONCERNS.
  
 TV JULY 19TH RESPONSE: REPEAT SEE RESPONSES ABOVE.
 ZONING 8.19 - [SATISFIED]
  
 IS THE INTENTION FOR GENERAL PUBLIC TO ACCESS REST OF
 SITE/RETAIL VIA ELEVATORS THROUGH THE RESIDENTIAL
 TOWERS? REPEAT COMMENT PORTION OF (9.J.IV.A.) PLEASE
 PROVIDE CLARIFICATION OF HOW GENERAL PUBLIC/USERS OF
 OFFICE, HOTEL, RETAIL, AND TRI-RAIL USERS WILL
 EFFICIENTLY ACCESS THESE FACILITIES FROM THE GARAGE.
  
 TV JULY 19TH RESPONSE: REPEAT SEE RESPONSES ABOVE.
 ZONING 8.19 - [PARTIALLY SATISFIED] REPEAT COMMENT FROM
 ABOVE. GENERAL PATRONS OF THE SITE (OFFICE, HOTEL,
 VISITORS) WITH ADA NEEDS THAT PARK ON FLOORS 3-8 DO NOT
 HAVE SPACES ADJACENT TO NON-RESIDENTIAL ELEVATORS AND
 CORRIDORS. REDISTRIBUTE OR INCLUDE SPACES IN THE AREAS
 SIMILAR TO LEVEL 2.
  
 PLEASE PROVIDE DIMENSIONS FOR LOADING BAY ON THE GROUND
 FLOOR
  
 TV JULY 19TH RESPONSE: PROVIDED (SEE SHEET A1-01 AND
 A4-02)
 ZONING 8.19 - [NOT SATISFIED] LOADING BAYS WITHIN THE
 GROUND LEVEL OF THE PARKING GARAGE ARE NOT DIMENSIONED,
 PLEASE PROVIDE THESE DETAILS.
  
 SHEET C-19 SHOWS ARROW IN OPPOSITE DIRECTION OF
 RESIDENTIAL DROP-OFF TRAFFIC FLOW
  
 TV JULY 19TH RESPONSE: THIS HAS BEEN CORRECTED (SEE
 SHEET C-19)
 ZONING 8.19 - [SATISFIED]
  
  
 28. WHERE ARE THE GENERATORS TRANFORMERS, AND OTHER
 MECHANICAL EQUIPMENT AND HOW ARE THEY SCREENED IN
 ACCORDANCE WITH CITY CODE REQUIREMENTS? [LABELED ON
 PLANS] [NOT SATISFIED] SHEET C-05 & C-04 SHOW FDC IN
 WITHIN THE MIDDLE OF BIKE RACKS, OR EXPOSED WITHIN ROW.
  
  TV JULY 19TH RESPONSE: IN THE ROOM LABELED ?TV?
 (TRANSFORMER VAULT) SHOWN ON PLANS, PLEASE SEE SHEETS
 A1-01 AND A4-02.
  ZONING 8.19 - [NOT SATISFIED] MECHANICAL ROOMS,
 GENERATORS, AND TRANSFORMERS ARE OKAY. REPEAT COMMENT:
 SHEET C-05 & C-04 SHOWS THE FDC VALVE LOCATED IN WITHIN
 THE MIDDLE OF BIKE RACK ON THE GROUND LEVEL OF THE
 HOTEL/OFFICE. PLEASE ADJUST PLANS ACCORDINGLY.
  
  PLEASE WALL-MOUNT ANY WATER METERS, FIRE/CHECK/CONTROL
 VALVES, ETC. WHENEVER POSSIBLE.
  
 TV JULY 19TH RESPONSE: WATER METERS, FIRE/CHECK/CONTROL
 VALVES, ETC., WHENEVER POSSIBLE, WILL BE MOUNTED.
 ZONING 8.19 - [ACKNOWLEDGED]
  
  ANY EXPOSED MECHANICAL EQUIPMENT, METERS, OR VALVES
 SHALL BE SCREENED FROM VIEW WITH LANDSCAPING.
  
 TV JULY 19TH RESPONSE: ANY EXPOSED MECHANICAL
 EQUIPMENT, METERS, OR VALVES SHALL BE SCREENED FROM
 VIEW WITH LANDSCAPING.
 ZONING 8.19 - [ACKNOWLEDGED]
  
 29. PLEASE CONSIDER USING SUSTAINABLE INFRASTRUCTURE
 SUCH AS ROOFTOP SOLAR OR RAINWATER CAPTURE/REUSE
 CISTERNS. NO RESPONSE PROVIDED. WHILE NOT REQUIRED, HAS
 THIS ITEM BEEN GIVEN ANY CONSIDERATION?
  
 TV JULY 19TH RESPONSE: THIS WILL BE CONSIDERED WHEN
 DEVELOPING CONSTRUCTION PLANS
 ZONING 8.19 - [ACKNOWLEDGED]
  
 30. SHEET A6-01 SHOWS PUBLIC OPEN SPACES EXTENDING INTO
 THE BUS LANE. [LANDSCAPE PLANS HAVE BEEN UPDATED
 REDUCING THE OPEN SPACES OUTSIDE OF THE BUS LANES
 [PLANS REVISED TO REMOVE SIDEWALK SERVING BUS LANE FROM
 THE OPEN SPACE] [SATISFIED] LANDSCAPE NO LONGER
 ENCROACHES/OVERLAPS
  
 31. FOR THE EVENTUAL DOWNTOWN ACTION COMMITTEE (DAC)
 MEETING, PLEASE PROVIDE FULLY DETAILED RENDERINGS AND
 PERSPECTIVE DRAWINGS OF THE FINAL PROJECT.
 [ACKNOWLEDGED] [PARTIALLY SATISFIED] PLEASE NOTE, ALL
 PROVIDED RENDERINGS ARE ONLY OF THE TAMARIND AND BANYAN
 PERSPECTIVES. THERE ARE NO RENDERS SHOWN FOR CONDITIONS
 ALONG CLEARWATER DR.
  
 TV JULY 19TH RESPONSE: ADDITIONAL RENDERS WILL BE
 TIMELY PROVIDED
 ZONING 8.19 - [SATISFIED]
  
 PLEASE PROVIDE DETAILS/RENDERS OF THE SPIRAL
 STAIRCASE/ELEVATOR SHAFT USED TO ACCESS THE UPPER
 PUBLIC OPEN SPACE/PLAZA
  
 TV JULY 19TH RESPONSE: ADDITIONAL DETAIL OF THE SPIRAL
 STAIRCASE/ELEVATOR IS PROVIDED ON SHEET A5-10.
 ZONING 8.19 - [PARTIALLY SATISFIED] TREE IN RENDERING
 NOT REPRESENTED IN LANDSCAPE PLANS OR ACCURATE TO
 PLANS. PLEASE ADJUST, SEE COMMENT #15 FOR INCLUSION OF
 ADDITIONAL STREET TREES.
  
 32. PROVIDE A PRELIMINARY CONSTRUCTION PLAN TO SHOW HOW
 HE SITE WILL BE DEVELOPED WHILE MAINTAINING ITC
 OPERATIONS, TO INCLUDE PARKING. ADDITIONALLY, PROVIDE
 THE PRELIMINARY PLAN FOR EMPLOYEE AND CONTRACTOR
 PARKING DURING CONSTRUCTION. [THIS IS A PERMITTING
 ISSUE THAT REQUIRES CONSIDERABLE COORDINATION AND WILL
 BE ADDRESSED PRIOR TO BUILDING PERMITS BEING ISSUED
 PLEASE CARRY FORWARD AS A CONDITION OF APPROVAL. NOTE
 THAT AS PART OF THE PSA, WE ARE REQUIRED TO PROVIDE THE
 COUNTY WITH A CONTINUOUS OPERATONS PLAN. THE PLAN IS TO
 RELOCATE PALM TRAN TO THE EAST SIDE OF THE TRACKS, AS
 IS UNDER DISCUSSION AMONG THE CITY, THE COUNTY AND
 APPLICANT.] [ACKNOWLEDGED]
  
  THERE ARE COLUMN LOCATIONS THAT WHEN COMBINED WITH THE
 LOCATION OF THE PROPOSED ITC FENCE CREATE CHOKE POINTS
 FOR THE BUS PATRONS AS THEY CHANGE BETWEEN ROUTES.
 WHILE THEY ALL APPEAR TO COMPLY WITH ADA MINIMUMS, THEY
 DO NOT PROVIDE COMFORTABLE PEDESTRIAN WIDTHS FOR TWO
 USERS TO PASS SIDE-BY-SIDE. PLEASE REVIEW.
 [ACKNOWLEDGED]
  
 TV JULY 19TH RESPONSE: THE PROPOSED PLAN AND ACCESS
 MEETS CODE AND ADA REQUIREMENTS AS DESIGNED AND HAS
 BEEN APPROVED BY THE COUNTY/PALMTRAN.
 ZONING 8.19 - [ACKNOWLEDGED]
  
 33. THE SITE, LANDSCAPE AND CIVIL PLANS ALL NEED TO
 SHOW CONSISTENT, CODE COMPLIANT CONDITIONS. [PLANS
 COORDINATED [NOT SATISFIED] ARCHITECTURAL, LANDSCAPE,
 AND CIVIL PLANS ALL FEATURE INCONSISTENCIES OR ELEMENTS
 NOT COMPLIANT WITH CODE, PLEASE REVISE.
  
  EXAMPLES INCLUDE:
  
  - BANYAN PEDESTRIAN DROPOFF, WHICH IS NOT PERMITTED,
 IS STILL SHOWN ACROSS ALL PLAN
 - CROSSWALK AT THE ENTRANCE OF ITC STILL SHOWN ON
 PLANS, BUT COMMENTS/REFERENCES STATE IT IS TO BE
 REMOVED.
 - ELEVATIONS FEATURE COLUMNS NOT PRESENT IN GROUND
 FLOOR PLANS.
 - ETC
  
 TV JULY 19TH RESPONSE: WE HAVE MADE CHANGES TO MAKE THE
 PLANS CONSISTENT AND CODE-COMPLIANT.
 ZONING 8.19 - [PARTIALLY SATISFIED] CHANGES HAVE BEEN
 MADE TO PLANS; HOWEVER INCONSISTENCIES STILL EXIST
 BETWEEN THE ARCH, CIVIL, AND LANDSCAPE PLAN SETS
 REGARDING LABELING.
  
  
 34. PROVIDE VERIFICATION THAT THE PROJECT MEETS THE
 STREETSCAPE REQUIREMENTS OF SECTION 94-113. THIS
 INCLUDES LIGHTING, SIDEWALK WIDTH, LANDSCAPE, BICYCLE
 PARKING, STREET FURNITURE, ETC. [NOTED] [THE PROJECT
 COMPLIES WITH STREETSCAPE REQUIREMENTS OF SECTION
 94-113.] [NOT SATISFIED] PLEASE PROVIDE DIMENSIONS FOR
 SIDEWALK WIDTHS AND CLEAR PATHS, PLEASE PROVIDE A
 LOCATION CALLOUT, DIMENSIONS, AND COUNT OF BICYCLE
 RACKS PROVIDED FOR PUBLIC ACCESS (REQUIREMENT IS 1
 SPACE PER 100 FT. OF STREET FRONTAGE).
  
 TV JULY 19TH RESPONSE: DIMENSIONS FOR SIDEWALK WIDTHS
 AND CLEAR PATHS ARE PROVIDED ON SHEETS C-10 AND C-11.
 CALLOUT, DIMENSIONS, AND COUNT OF BICYCLE RACKS
 PROVIDED FOR PUBLIC ACCESS ARE PROVIDED ON SHEETS C-10,
 C-11, A0-02 AND L111.
  
 ZONING 8.19 - [PARTIALLY SATISFIED] SEE COMMENT #15.
 INCLUSION OF ADDITIONAL STREET TREES ON THE CLEARWATER
 FRONTAGE IS REQUIRED.
  
 SHEET A0-02 ? THE TABULAR DATA SHOWS 160 GROUND LEVEL
 SPACES AND 122 UNALLOCATED BIKE SPACES. WITH THE TOTAL
 PROVIDED BIKE SPACES AT 606, PLEASE CLARIFY WHERE IS
 THIS TOTAL COMING FROM? CAN YOU PLEASE SPECIFY HOW MANY
 SPACES ARE ALONG THE GROUND LEVEL/ADJACENT TO ROW?
 THESE BIKES SATISFY THE 1 SPACE PER 100 FT. OF STREET
 FRONTAGE REQUIREMENT.
  
 35. PROVIDE COMPLIANCE WITH SEC. 94?106 7 GENERAL USES
 WITH SPECIAL REQUIREMENTS (8.A) MICRO-UNITS
 (A.-F.)[NOTES ADDED TO PLAN TO SHOW COMPLIANCE WITH
 MINIMUM AVERAGE AND OTHER DWELLING UNITS REQUIREMENTS]
  
 A. MICRO-UNIT MEANS A SMALL RESIDENTIAL ?UNIT WITH A
 TOTAL SQUARE FOOT8GE BETWEEN 300 SQUARE FEET AND 549
 SQUARE FEET, WITH A FULLY FUNCTIONING KITCHEN AND
 BATHROOM. [REGULAR UNITS_WILL COMPLY TO ALL REGULATIONS
 THERE ARE ALSO COMPLAINT MICRO UNITS THAT ARE LESSED
 OUT FROM THE REGULAR UNIT AVERAGE CALCULATION]
 B. SEC. 94-109 DWELLING UNIT REQUIREMENTS
 VIII. DWELLING UNITS SHALL NOT BE LESS THAN 550 SQUARE
 FEET. IN MULTIPLE DWELLING UNIT BUILDINGS, THE
 CUMULATIVE AVERAGE OF ALL DWELLING UNITS SHALL NOT BE
 LESS THAN 800 SQUARE FEET.
 IX. SMALLER DWELLING UNITS MAY BE ALLOWED AS
 MICRO-UNITS. THE CUMULATIVE AVERAGE SIZE MINIMUM SHALL
 NOT BE APPLICABLE TO MULTIPLE DWELLING UNIT BUILDINGS
 WHERE MICRO-UNITS COMPOSE A MINIMUM OF 80 PERCENT OF
 THE TOTAL NUMBER OF UNITS. IN ALL OTHER CASES, THE
 CUMULATIVE AVERAGE SIZE OF ALL DWELLING UNITS SHALL NOT
 INCLUDE THE MICRO-UNITS IN SUCH CALCULATION. SEE
 MICRO-UNITS. [ACKNOWLEDGED] [NOT SATISFIED] PLEASE
 PROVIDE CLARIFICATION FOR THE PARKING PROVIDED FOR
 MICRO-UNITS, IF ITS 13 CAR-SHARE ALONE OR IF ITS 13
 SPACES AND 13 CAR-SHARE (26 TOTAL). PLEASE PROVIDE
 FINAL COUNT AND LOCATION FOR THE REQUIRED 0.5 BIKE
 SPACES PER UNIT. PLEASE NOTE CONDITION OF APPROVAL FOR
 MICRO-UNITS WILL INVOLVE A CONTRIBUTION TO THE CITY
 TROLLEY FEE PER UNIT PER MONTH.
  
 TV JULY 19TH RESPONSE: SHEET A0-02 PROVIDES THE
 REQUESTED INFORMATION FOR THE MICRO UNITS PARKING.
 SHEET A0-02 PROVIDES THE FINAL COUNT OF BIKE SPACES.
 SHEET A0-02 PROVIDES THE CALCULATION FOR THE AVERAGE
 SIZE OF ALL DWELLING UNITS (NOT INCLUDING MICRO UNITS)
 [SATISFIED]
  
 ADITIONAL COMMENTS BASED UPON RESUBMITTED DOCUMENTS
 SHEETS, AND REVISED PLANS: 7/5/22
  
 1. REVISE LIST OF VARIANCES BASED UPON CORRECTIONS TO
 OPEN SPACE, CURB CUT WIDTHS, PLANAR BREAKS/FACADE
 ARTICULATION, ETC. ANY DEVIATION FROM REQUIRED MINIMUMS
 OR MAXIMUMS CONSTITUTES A REQUEST FOR VARIANCE.
  
 TV JULY RESPONSE: REPEAT SEE RESPONSES ABOVE.
 ZONING 8.19 - DUE TO THE UNRESOLVED COMMENTS WITHIN
 THIS REVIEW, ADDITIONAL VARIANCES MAY BE REQUIRED OR
 EXISTING REQUESTS MAY HAVE TO BE MODIFIED.
  
 2. FACADE ARTICULATION? PLEASE PROVIDE MORE DETAILS FOR
 THE GARAGE SCREENING, GREEN-WALL, AND PLANAR BREAKS.
  
 TV JULY 19TH RESPONSE: REPEAT SEE RESPONSES ABOVE.
 ZONING 8.19 ? REPEAT COMMENT, PLEASE PROVIDE
  
 3. PLEASE PROVIDE ALL NECESSARY APPROVALS FROM FIRE
 DEPARTMENT, UTILITY PROVIDERS, FPL, ETC. FOR THE
 VACATING/MODIFICATION OF ANY EASEMENTS AND STRUCTURES.
  
 TV JULY 19TH RESPONSE: REPEAT SEE RESPONSES ABOVE.
 ZONING 8.19 ? REPEAT OF RESPONSES ABOVE
  
 4. ON SITE PLANS, THE CROSSWALK AT THE INTERSECTION OF
 CLEARWATER / BANYAN NOT REFLECTIVE OF EXISTING BANYAN
 STREETSCAPE, THERE ARE SEPARATE BIKE LANE AND
 PEDESTRIAN CROSSING LANE
  
 TV JULY RESPONSE: REPEAT SEE RESPONSES ABOVE.
 ZONING 8.19 ? [PARTIALLY SATISFIED] BIKELANE/CROSS WALK
 SHOWN ON CIVIL SET BUT NOT LANDSCAPE/ARCHITECTURE,
 PLEASE ADJUST
  
 5. SHOW SETBACK LINES ON THE ELEVATIONS
  
 TV JULY 19TH RESPONSE: THE SETBACK LINES HAVE BEEN
 ADDED TO THE ELEVATIONS.
 ZONING 8.19 - [SATISFIED]
  
 6. PLEASE PROVIDE CIRCULATION DIAGRAM OR ILLUSTRATE ALL
 INTERIOR DOORS/ENTRYWAYS TO, FROM, AND BETWEEN ROOMS,
 ENCLOSURES, RETAIL SPACES, ETC. (GROUND FLOOR FOR
 EXAMPLE ONLY SHOWS DOORS TO TR, BIKE ROOM, AND
 EXTERNAL/FACADE ROOMS) HELPS CLARIFY INTERNAL
 CIRCULATION OF PATRONS.
  
 TV JULY 19TH RESPONSE: INTERIOR DOORS HAVE BEEN ADDED
 TO THE DRAWINGS ON THE GROUND FLOOR AND LEVEL 02 SO
 THAT CIRCULATION CAN BE BETTER UNDERSTOOD.
 ZONING 8.19 - [SATISFIED]
  
 7. PRIVATE OPEN SPACE ON GROUND FLOOR REQUIRED TO BE
 DESIGNED TO MEET PUBLIC OPEN SPACE REQUIREMENTS.
  
 TV JULY 19TH RESPONSE: REPEAT SEE RESPONSES ABOVE.
 ZONING 8.19 - [SATISFIED] REPEAT OF PRIVATE AND PUBLIC
 OPEN SPACE COMMENTS ABOVE.
  
  
 8. MAXIMUM FOOTPRINT LENGTH EXCEEDS 350 FT. FOR TOD-25
 WOULD REQUIRE VARIANCE.
  
 TV JULY 19TH RESPONSE: REPEAT SEE RESPONSES ABOVE.
  ZONING 8.19 - [ACKNOWLEDGED] VARIANCE IS REQUESTED.
  
 9. PLEASE PROVIDE A PHOTOMETRIC PLAN, SITE ILLUMINATION
 MINIMUM REQUIREMENT IS 0.6 FOOTCANDLES AS MEASURED ATHE
 BACK EDGE OF THE CURB AND ONE FOOT ABOVE THE SIDEWALK.
  
 TV JULY 19TH RESPONSE: A PHOTOMETRIC PLAN WILL BE
 PROVIDED WITH THE PERMIT DRAWINGS.
 ZONING 8.19 - [ACKNOWLEDGED] WILL INCLUDE CONDITION TO
 PROVIDE PHOTOMETRICS BEFORE BUILDING PERMIT.
  
 10. PLEASE FULLY DIMENSION SITE PLANS AND DRAWINGS, OR
 PROVIDE SEPARATE SHEETS OF DIMENSIONED SITE PLANS AND
 DRAWINGS, VERY LITTLE SPATIAL INFORMATION IS PROVIDED
 WITHIN PLANS.
  
 SIDEWALK WIDTHS, CURB-CUTS, LANDSCAPE BEDS, PLANAR
 BREAK DEPTHS, FRONTAGES, SETBACKS, PROPERTY LINES, ETC.
  
 TV JULY 19TH RESPONSE: REPEAT SEE RESPONSES ABOVE.
 ZONING 8.19 - [NOT SATISFIED] SEE RESPONSES ABOVE. CURB
 CUT WIDTHS NEED TO BE RE-MEASURED, AND PLANAR BREAK
 DEPTHS NEED TO BE PROVIDED.
  
 11. BASED UPON THE RESUBMITTED DOCUMENTS AND REVISED
 DRAWINGS, THE EXISTING ON-STREET PARKING ALONGLEARWATER
 DRIVE HAS BEEN REMOVED. THE REMOVAL OF METERED
 ON-STREET PARKING WILL INCUR A FEE. PLEASE CONTACT ED
 DAVIS FROM PARKING TO CLARIFY FEES ASSOCIATED WITH
 THESE SPACES. [email protected]
  
 TV JULY 19TH RESPONSE: THE EXISTING TAX INCENTIVE
 AGREEMENT WITH THE CRA AND APPROVED BY THE CITY
 COMMISSION ADDRESSES THE REMOVAL OF THE METERED
 ON-STREET PARKING. WE WILL CONTACT THE APPROPRIATE CITY
 PERSONNEL TO DISCUSS REMOVAL.
 ZONING 8.19 - [ACKNOWLEDGED]
  
  
  
 ADDITIONAL COMMENTS BASED UPON RESUBMITTED DOCUMENTS
 SHEETS, AND REVISED PLANS OF 7/25/22: 8-18-22
  
 1. PLEASE CLARIFY, ON SHEET A1-01 A ?WALL MURAL? IS
 SHOWN BETWEEN RESIDENTIAL BUILDING AND ITC, IS THERE A
 SEPARATION WALL BEING INSTALLED HERE? MURAL WILL
 REQUIRE A SEPARATE PERMIT.
  
 2. PLEASE PROVIDE FAR DIAGRAMS FOR ALL FLOORS. WHILE
 PROJECT IS WELL WITHIN ITS PERMITTED FAR, DIAGRAMS
 NEEDED TO DOCUMENT FAR SHOULD FUTURE DEVELOPMENT OR
 REVISIONS OCCUR ON SITE.
  
  
 CHRIS KIMMERLY, AICP
 URBAN DESIGN PLANNER
 822.1426 [email protected]

Review Stop Z ZONING
Rev No 2 Status F Date 07-06-2022 Cont ID  
Sent By ckimmerl Date 07-06-2022 Time 13:36 Rev Time 0.00
Received By ckimmerl Date 07-06-2022 Time 13:36 Sent To  
Notes
2022-07-06 13:36:51CASE NO. FSPR 22-05
 TRANSIT VILLAGE 2022
 150 CLEARWATER DRIVE
  
 - CONTACT CHRIS KIMMERLY @ (561) 822-1426,
 [email protected]
 - OR ERIC SCHNEIDER @ (561) 822-1446,
 [email protected]
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT. [ACKNOWLEDGED]
 THANK YOU FOR THE EXCEL DOCUMENT FOR THE RESPONSES,
 PLEASE PROVIDE DIRECT RESPONSES ON RESUBMITTALS WITHIN
 A WORD OR SIMILAR FORMAT. (DISPLAY THE QUESTION ASKED
 BY REVIEWERS AND THE ANSWER/RESPONSE FROM APPLICANTS)
  
 - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF THREE
 (3) PAPER COPIES AND AN ELECTRONIC COPY IN .PNG AND
 .PDF FORMAT OF ALL PLANS. PLEASE NOTE THAT CHANGES ON
 THE RESUBMITTED PLANS OR THE SUBMITTAL OF
 INFORMATION/PLANS TO ADDRESS THE COMMENTS MAY RESULT IN
 ADDITIONAL COMMENTS. [ACKNOWLEDGED]
  
 - THE PPRC COMMENTS SHALL BE SUFFICIENTLY ADDRESSED AND
 SUBMITTED TO THE PLANNING DIVISION BY 5 PM ON FRIDAY,
 05/27/22, TO BE ELIGIBLE TO BE SCHEDULED FOR THE
 7/13/22 DOWNTOWN ACTION COMMITTEE MEETING. [COVID
 DELAYS NOT CAUSED BY APPLICANT]
  
 - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT
 RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS
 FROM THE DATE OF THE PPRC MEETING (BY AUGUST 12, 2022),
 THE PLANNING DIVISION MAY NOTIFY THE APPLICANT THAT THE
 CASE IS CONSIDERED WITHDRAWN. ANY FURTHER ACTION SHALL
 REQUIRE A NEW DEVELOPMENT APPLICATION. [ACKNOWLEDGED]
  
 - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($500).
 [ACKNOWLEDGED]
  
 1. THIS PROPOSED PROJECT IS SIGNIFICANTLY DIFFERENT
 THAN THE CURRENTLY APPROVED SITE PLAN; THEREFORE, IT IS
 NOT A ?MODIFICATION TO THE EXISTING APPROVED SITE PLAN?
 AS STATED IN THE JUSTIFICATION STATEMENT, BUT RATHER A
 NEW SITE PLAN APPROVAL. THE PREVIOUSLY APPROVED SITE
 PLAN AND THE VARIANCES THAT WERE GRANTED DO NOT
 AUTOMATICALLY APPLY TO THE NEW SITE PLAN. ANY VARIANCES
 THAT ARE REQUIRED BASED ON THE NEW BUILDING DESIGN AND
 SITE LAYOUT REQUIRE APPROVAL BY THE DOWNTOWN ACTION
 COMMITTEE THROUGH THE VARIANCE PROCESS. [THE CURRENT
 SITE PLAN IS APPROVED AND VESTED BY MULTIPLE APPROVALS
 PROVIDED BY WPB AND PBC PURSUANT TO THE PSA. THESE
 VESTED ITC AND GROUND LEVEL FEATURES THAT CAN BE
 LEGALLY BUILT TODAY ARE INTENDED TO BE CARRIED FORWARD
 IN THE NEW APPROVAL AND WE HAVE BEEN ASSURED BY
 ADMINISTRATION THAT THE CITY WILL RECOGNIZE THESE
 VESTED FEATURE AND WILL BE WORKING WITH THE APPLICANT
 TO CARRY THEM FORWARD IN THE NEW SITE PLAN APPROVAL
 BEING SOUGHT THAT WILL EVENTUALLY REPLACE AND SUPERSEDE
 THE EXISTING VESTED APPROVAL WITH A NEW APPROVAL THAT
 REAFFIRMS THESE PREVIOUSLY APPROVED SITE CONDITIONS.]
 PLEASE NOTE, THERE ARE NO ?VESTED? OR CARRIED OVER
 APPROVALS FOR THIS PROJECT, BEYOND THE ORIENTATION OF
 THE ITC/SFRTA FACILITIES, THE BUS/TRAIN OPERATIONS, AND
 THE REQUIREMENTS WITHIN THE COUNTY PSA FOR RESERVED ITC
 AND SFRTA PARKING SPACES. THE REST OF SITE, PROPOSED
 STRUCTURES, CIRCULATION, ETC. WILL BE REVIEWED AND
 TREATED AS A NEW SITE PLAN SUBMITTAL. ANY PREVIOUSLY
 OBTAINED VARIANCES, WAIVERS, AND APPROVALS FROM
 DAC/STAFF MUST BE REACQUIRED/APPLIED FOR, AS THE
 OVERALL SITE CONDITIONS AND PLANS HAVE CHANGED
 SIGNIFICANTLY FROM THE PREVIOUSLY APPROVED PLANS FOR
 THIS PROPERTY.
  
 2. STAFF HAS NOTED THAT THE PROPOSED SITE PLAN,
 INCLUDING THE USE MIX, DIFFERS FROM THE AGREEMENT FOR
 PURCHASE AND SALE DATED AUGUST 12, 2012. SINCE THE
 AGREEMENT FOR PURCHASE AND SALE ESTABLISHES THAT
 MODIFICATIONS ARE PERMITTED, SUBJECT TO PALM BEACH
 COUNTY APPROVAL, PLEASE PROVIDE THE LATEST AMENDMENT OR
 VERSION OF THE AGREEMENT FOR PURCHASE AND SALE THAT
 AUTHORIZES THE CHANGES PRESENTED IN THE CURRENT
 SUBMITTAL, INCLUDING, BUT NOT LIMITED TO:
 [COPIES OF THE PSA AND ALL AMENDMENT PROVIDED. A COPY
 OF PBC WRITTEN CONSENT TO THE SUBMITTED PLAN PACKAGE
 WAS PROVIDED PURSUANT TO THE PSA AND COPIES OF ALL
 AGREEMENTS HAVE ALSO BEEN PROVIDED] [SATISFIED] THANK
 YOU FOR PROVIDING PSA DOCUMENTATION AND ADDITIONAL
 AMENDMENTS/AGREEMENTS.
  
 A. THE REDUCTION IN THE REQUIRED 40 PARKING SPACES FOR
 SFTRA/COUNTY STAFF AND 250 SFRTA PATRON PARKING SPACES
 (TOTAL 290 PARKING SPACES) TO 275 PARKING SPACES FOR
 THESE USERS.
 [THIS STATEMENT IS INCORRECT. THE MODIFIED PSA REQUIRES
 25 SPACES TO THE COUNTY WHICH IS WHAT IS PROVIDED]
 [SATISFIED] THANK YOU FOR PROVIDING THE NECESSARY PSA
 DOCUMENTATION WITH AMENDMENTS. THE LATEST AMENDMENT TO
 PSA (EXHIBIT 2) THAT WAS PROVIDED WITH RESUBMITTAL
 STATES: 250 PARKING SPACES FOR TRI-RAIL, AND 25 SPACES
 FOR COUNTY.
  
 B. THE REMOVAL OF LEARNING CENTER/CULTURAL/EDUCATION
 USES FROM THE PROJECT.
 [THIS USE WAS VOLUNTARY AND IS NOT A REQUIREMENT OF ANY
 APPROVAL]
 [NOT SATISFIED] SECTION 2.3.2 OF PSA (PG.14) STATES:
 ?THE SITE PLAN WILL INCLUDE, BUT NOT BE LIMITED TO,
 CIVIC USE (LEARNING CENTER/CULTURAL CENTER/EDUCATION),
 COMMERCIAL/OFFICE, HOTEL ROOMS, RESIDENTIAL UNITS
 (STUDENT/WORKFORCE/MARKET) INCLUDING WORKFORCE AND/OR
 AFFORDABLE UNITS? LUXURY RENTAL UNITS AND AMENITY
 RETAIL.?
 - APPEARS TO BE A REQUIREMENT OF THE PSA, HAS THIS BEEN
 AMENDED? IF SO PLEASE PROVIDE SPECIFIC DOCUMENT OR
 OUTLINE LOCATION, SO STAFF CAN VERIFY.
  
 C. THE JUSTIFICATION STATEMENT SITE DATA TABLE LISTS 42
 WORKFORCE HOUSING UNITS AS BEING REQUIRED, WHILE THE
 AGREEMENT FOR PURCHASE AND SALE ONLY REQUIRES 38. THE
 PLANS DO NOT PROVIDE A BREAKDOWN TO VERIFY COMPLIANCE
 WITH EITHER NUMBER.
 [THE 42 WORKFORCE HOUSING UNITS REQUIRED BY THE PSA ARE
 SHOWN IN THE SITE PLAN TABULAR. THEIR FINAL LOCATION
 HAS NOT YET BEEN DETERMINED, HOWEVER THE APPLICANT
 INTENDS TO PROVIDE THEM IN A MANNER SO AS TO NOT
 CLUSTER OR CONCENTRATE THEM IN ANY ONE LOCATION. THE
 PSA REQUIRES THEM TO BE ON SITE AND COMPLY WITH THE
 COUNTY HOUSING PROGRAM. THE APPLICANT WILL CONTINUE TO
 WORK WITH WPB AND PBC ON THE TERMS OF THE WFH UNITS.]
 [PARTIALLY SATISFIED] THANK YOU FOR PROVIDING THE
 NECESSARY DOCUMENTATION FOR THE LATEST AMENDMENT TO PSA
 (5C-5). THIS SHEET (5C-5) INCLUDES ADDITIONAL (4)
 WORKFORCE UNITS. DO NOT SEE THESE WFH UNITS CALLED OUT
 OR MENTIONED IN DATA TABLES OR SITE PLAN.
  
 D. SECTION 3E OF EXHIBIT D TRAFFIC CIRCULATION PLAN OF
 THE AGREEMENT FOR PURCHASE AND SALE LIMITS THE NUMBER
 OF PARKING SPACES WITHIN THE PARKING GARAGE TO THE 290
 PUBLIC USE PARKING SPACES AND, ??PROVIDE NOT MORE THAN
 THE NUMBER OF PARKING SPACES REQUIRED BY THE CITY OF
 WEST PALM BEACH FOR THE MIX OF USES AND
 INTENSITIES/DENSITIES?AS ACTUALLY CONSTRUCTED??. AS
 WILL BE SHOWN LATER IN THESE COMMENTS, THE PROJECT
 EXCEEDS THIS STANDARD.
 [THESE SPACES ARE INTENDED TO SERVE THE TRANSIT USES
 REQUIRED TO BE PROVIDED TO THESE GOVERNMENTAL
 PROVIDERS. THESE PARKING SPACES ARE INCLUSIVE THE
 MINIMUM PARKING REQUIRED FOR THE PROJECT AND ARE NOT IN
 EXCESS OF THE MAXIMUM PARKING PERMITTED ON SITE. THE
 GARAGE COMPONENT IS BEING BUILT TO SERVE THE ENTIRE
 PROJECT AND THE PSA REQUIRES CONTINUOUS CONSTRUCTION OF
 THE PROJECT UNTIL THE PROJECT IS COMPLETED.]
 [PARTIALLY SATISFIED]
  
 THANK YOU FOR PROVIDING THE NECESSARY DOCUMENTATION ON
 THE PSA AND ITS AMENDMENTS, IN ADDITION TO THE PARKING
 BREAKDOWN; BASED UPON THIS:
  
 THE HOTEL ROOM/AMENITY, RESIDENTIAL, RETAIL, OFFICE,
 GUEST AND SFRTA/COUNTY PARKING SPACES CHECK OUT WITH
 REQUIRED MINIMUMS AND 25% TOD REDUCTION.
  
 - CLARIFICATION, TABLE IV-9: MICRO-UNITS MINIMUM
 PARKING REQUIREMENT IS ZERO, NOT 1/13 UNITS. ONLY
 CAR-SHARE HAS 1/13 REQUIREMENT.
  
 - PLEASE MAKE CLEAR FROM THE TABLE PROVIDED, ARE YOU
 PROVIDING ONLY 13 CAR-SHARE SPACES FOR MICRO-UNITS? OR
 ARE YOU ARE PROVIDING 13 SPACES FOR MICRO-UNITS AND
 THEN ADDITIONAL 13 CAR-SHARE SPACES (26 TOTAL)? THE
 CAR-SHARE SPACES WOULD BE INDEPENDENT FROM OTHER
 PARKING AND DESIGNATED/RESERVED AS SUCH.
 PER SECTION 94-106 (8.A) A PROJECT WITH RESIDENTIAL
 MICRO-UNITS SHALL PROVIDE ON-SITE CAR-SHARE STATIONS ON
 A RATIO OF ONE PER EVERY 13 UNITS. THE TOTAL AMOUNT OF
 CAR-SHARE STATIONS MAY BE REDUCED BY ONE CAR-SHARE
 STATION PER EVERY 13 ON-SITE PARKING SPACES PROVIDED.
 THE TOTAL NUMBER OF CAR-SHARE STATIONS MAY BE ADJUSTED
 BASED ON CURRENT SYSTEM DEMANDS, BUT A MINIMUM OF ONE
 CAR-SHARE STATION SHALL BE PROVIDED. THE REMAINDER OF
 THE SPACES SHALL BE RESERVED FOR FUTURE SERVICE
 EXPANSION.
  
 3. THE SITE CURRENTLY CONSISTS OF A PBC PARCEL AND AN
 SFTRA PARCEL.
 THANK YOU FOR PROVIDING AMENDMENT 3 ? 2021 ? EXTENSTION
 TO AUG 2024, WHICH MENTIONED THAT THE SFRTA SPACES TO
 BE A CONDOMINUM. THIS INDICATES THAT THE PROJECT WILL
 BE UNDER CONDOMINIUM OWNERSHIP RATHER THAN SEPARATE
 PARCELS. IF THE AGREEMENT IS AMENDED AND THERE WILL BE
 FEE SIMPLE PARCELS, THOSE PARCEL LINES NEED TO BE
 SHOWN/INDICATED NOW, SO THAT STAFF CAN VERIFY THAT
 THERE ARE NO BUILDING SEPARATATION OR SETBACK ISSUES
 THAT DO NOT COMPLY WITH BUILDING, ZONING, OR FIRE CODE,
 AND IF ANY VARIANCES ARE NEEDED AS PART OF THE
 APPROVAL.
  
 E. THE DECKS, COLUMNS AND A PORTION OF THE RETAIL
 BUILDING ON THE SOUTH END OF THE SECOND FLOOR CROSS
 THIS PARCEL LINE, WHICH CREATE SETBACK AND BUILDING
 SEPARATION ISSUES THAT NEED TO BE ADDRESSED.
 [CONFIRMED]
 [NOT SATISFIED] SEE COMMENT ABOVE
  
 F. THE AGREEMENT FOR PURCHASE AND SALE INDICATES THAT
 PALM BEACH COUNTY WILL RETAIN OWNERSHIP OF THE
 INTERMODAL TRANSIT CENTER TO A POINT 21 FEET IN THE
 AIR. THE APPLICATION DOES NOT MENTION HOW THIS PROPOSED
 SUBDIVISION WILL OCCUR. [THESE PROPERTY LINES WILL BE
 ADDRESSED AS PART OF THE SUBDIVISION PROCESS OR BY
 AGREEMENT]
 [NOT SATISFIED] SEE COMMENTS ABOVE
  
 G. THE JUSTIFICATION STATEMENT INDICATES THAT THE
 AGREEMENT FOR PURCHASE AND SALE INCLUDES THE SFRTA, YET
 THEY ARE NOT SHOWN AS A PARTY TO STAFF?S COPY OF THE
 AGREEMENT. WILL THE SFRTA RETAIN ANY OWNERSHIP AND IF
 SO, HOW WILL THE PARCEL BE SUBDIVIDED? [LEGAL
 SUBDIVISION PROCESS I.E. VERTICAL SUB DIVISION, WILL BE
 PURSUED] [SFRTA USES THE PARKING LOT PURSUANT TO AN
 EASMENT FROM THE COUNTY. THE APPLICANT HAS AN AGREEMENT
 WITH SFRTA TO PROVIDE EITHER FEE SIMPLE OR AN EASEMENT
 FOR ANY USE OF THE SFRTA PROPERTY BORDERING THE
 TRACKS.]
 [NOT SATISFIED] PLEASE PROVIDE COPY OF AGREEMENT.
  
 4. TRANSIT VILLAGE BOUNDARY DIAGRAM SHEET A0-03
 DIFFERENT FROM THE ?ITC PROPERTY MAP? AND ?REQUIRED
 MODIFICATIONS FROM ORIGINAL APPROVAL IN OCT. 2011.
 CLEARLY SHOW THE ITC BOUNDARY ON THE GROUND LEVEL AND
 SECOND LEVEL OF THE VARIOUS PLANS. [THIS PLAN IS PART
 OF THE PSA AND THE BOUNDARIES HAVE BEEN ADJUSTED BY
 AMENDMENTS. THE CURRENT PLAN IS ACCURATE]
 [PARTIALLY SATISFIED] THANK YOU FOR PROVIDING AN
 ADJUSTED BOUNDARY MAP FOR THE PROJECT.
  
 BASED ON THIS NEW MAP, PLEASE CLARIFY, DOES THE ITC OWN
 THE GROUND-LEVEL PORTION OF THE HOTEL/OFFICE? THE
 BOUNDARY SHEET A0-03 SHOWS RETAIL, FCC,
 ELEVATORS/STAIRS AND MOTOR LOBBY WITHIN THE ITC
 PROPERTY BOUNDARY.
  
 5. THERE ARE NUMEROUS UTILITY AND OTHER EASEMENTS SHOWN
 ON THE SURVEY. ALL OF THESE EASEMENTS MUST BE SHOWN ON
 THE SITE AND LANDSCAPE PLANS (GROUND LEVEL AND SECOND
 LEVEL) TO SHOW THAT THERE IS NO CONFLICT WITH THE
 PROPOSED DEVELOPMENT. [PLANS REVISED TO REFLECT ALL
 EASEMENTS ON GROUND AND SECOND LEVELS.]
 [NOT SATISFIED]
  
 THANK YOU FOR PROVIDING REVISED SURVEY AND PLANS WITH
 EASEMENTS ILLUSTRATED. BASED UPON THESE SHEETS AND
 ITEMS:
 - RESUBMITTED SURVEY DOES NOT APPEAR TO BE ACCURATE,
 DOES NOT FULLY REFLECT NEW BANYAN STREETSCAPE
 CONDITIONS AND UPDATES. MISSING THE HARDENING DONE BY
 FPL TO THEIR TRANSMISSION LINES, THERE IS A NEW/LARGER
 POLE ON BANYAN. THE LINES FROM THIS POLE RUN THROUGH
 THE FUTURE BUILDING. TREE GRATES ON BANYAN SIDE NO
 LONGER EXIST. ROW INCLUDES BIKE PATH AND PEDESTRIAN
 SIDEWALK.
 - PROVIDED SURVEY SHOWS 20? OVERHEAD UTILITY LINE
 EASEMENT ALONG RAILROAD/EASTERN PORTION OF PROPERTY,
 NOT REFLECTED IN SITE PLANS. PLEASE PROVIDE FPL
 APPROVALS TO VACATE OR MODIFY THIS EASEMENT.
 - ARE THE FIBER OPTIC EASEMENT AND FPL EASEMENT, ON THE
 SOUTHERN END OF PROPERTY TO REMAIN OR ARE THEY TO BE
 MODIFIED/VACATED? PLEASE PROVIDE NECESSARY APPROVALS IF
 VACATING OR MODIFYING. THESE PORTIONS OF THE EASEMENTS
 LIKELY WON?T BE IMPACTED BY ANY DEVELOPMENT, BUT NOTE
 TREES/LANDSCAPING MAY CONFLICT.
 - PROVIDED SURVEY SHOWS 20? FIRE EMERGENCY ACCESS
 EASEMENT, THIS WILL HAVE TO BE MODIFIED TO ALIGN WITH
 THE PROPOSED EGRESS. PLEASE PROVIDE APPROVALS FROM FIRE
 DEPT. TO ALTER THIS.
 - PROVIDED SURVEY SHOWS A CROSS ACCESS EASEMENT ON THE
 EASTERN BOUNDARY AS PART OF THE ITC, IS THIS TO REMAIN?
  
 6. PLEASE DOCUMENT AND IDENTIFY ALL REQUESTED VARIANCES
 AND WAIVERS FOR THE PROPOSED SITE PLANS. [1) EXISTING
 ENTRANCE WIDTH VARIANCE EXISTING APPROVED CONDITION TO
 BE CARRIED FORWARD 2) SAME VARIANCE TO ALLOW THE PUBLIC
 OPEN SPACE TO BE PROVIDED AS A PUBLIC PLAZA ON LEVEL 2]
 [NOT SATISFIED]
  
 BASED UPON THE DOCUMENTATION PROVIDED WITHIN THIS
 RESUBMITTAL, THE PROJECT WILL REQUIRE/SEEK MORE THAN
 THE TWO PROPOSED VARIANCES. PLEASE ADDRESS ALL COMMENTS
 AND NOTE ANY DEVIATION FROM THE MINIMUM/MAXIMUM
 REQUIREMENTS AS THESE WILL CONSTITUTE ADDITIONAL
 REQUESTS FOR VARIANCES/WAIVERS.
  
 - POTENTIALLY (4) VARIANCES ALONE FOR THE CURB-CUTS
 PRESENTED ALONG CLEARWATER DR. EACH INGRESS/EGRESS
 APPEARS TO EXCEED THE 25? WIDTH MAXIMUM.
 - OPEN SPACES NEED ADJUSTMENT AND CLARIFICATION IN
 TYPOLOGY AND HOW REQUIREMENTS ARE MET, MAY CONSTITUTE
 ADDITIONAL VARIANCES
 - PROPOSED PUBLIC OPEN SPACE ON 2ND FLOOR, REQUIRES
 APPROVAL FROM BOARD, WILL SEEK IN THE FORM OF A
 VARIANCE.
 - MAXIMUM FOOTPRINT LENGTH EXCEEDS 350 FT. FOR TOD-25
 WOULD REQUIRE VARIANCE.
 - THE NUMBER OF ACCESS POINTS ONTO EACH RIGHT OF WAY
 EXCEEDS THE 2 PERMITTED VIA SEC. 94-312 AND NO PROPERTY
 SHALL HAVE A TOTAL OF MORE THAN 4 ACCESS POINTS. WILL
 REQUIRE AN ADDITIONAL VARIANCE REQUEST.
 THESE ARE JUST SOME EXAMPLES OF PENDING VARIANCE
 REQUESTS, ADDITIONAL VARIANCES ARE DEPENDENT ON MEETING
 OTHER REQUIREMENTS OUTLINED IN THESE COMMENTS OR WITHIN
 THE CODE, UPON RESUBMITTAL.
  
 IT IS ON THE APPLICANT TO PROVIDE ALL REQUESTED
 VARIANCES TO PLANNING STAFF.
  
 PLEASE REMEMBER THAT YOU WILL BE CHARGED $300 PER
 ADDITIONAL VARIANCE OR WAIVER.
  
 7. PLEASE PROVIDE AN UPDATED SURVEY CLEARLY DOCUMENTING
 THE CHANGES INCORPORATED AS PART OF THE RECENT BANYAN
 BOULEVARD STREETSCAPE PROJECT. ALL PLAN SHEETS MUST
 REFLECT THE ACCURATE BANYAN STREET CONFIGURATION. THIS
 IS CURRENTLY NOT REFLECTED ON ANY OF THE SUBMITTED PLAN
 SHEETS. [SURVEY UPDATED TO SHOW CHANGES TO BANYAN
 BOULEVARD GEOMETRY]
 [NOT SATISFIED]
 THANK YOU FOR PROVIDING REVISED SURVEY AND PLANS WITH
 EASEMENTS ILLUSTRATED. BASED UPON THESE SHEETS AND
 ITEMS:
  
 SEE COMMENT 5.
  
 RESUBMITTED SURVEY DOES NOT APPEAR TO BE ACCURATE, DOES
 NOT FULLY REFLECT NEW BANYAN STREETSCAPE CONDITIONS AND
 UPDATE. MISSING THE HARDENING DONE BY FPL TO THEIR
 TRANSMISSION LINES, THERE IS A NEW/LARGER POLE ON
 BANYAN. TREE GRATES ON BANYAN SIDE NO LONGER EXIST. ROW
 INCLUDES BIKE PATH AND PEDESTRIAN SIDEWALK.
  
 UPON REVIEW OF NEWLY SUBMITTED SURVEY, CURRENT
 CONDITIONS ARE NOT REFLECTED. FPL CURRENTLY HAS TWO
 DISTRIBUTION POLES ON THE BANYAN FRONTAGE, ONE OF WHICH
 IS A NEW POLE (ADDED WITH THE BANYAN STREETSCAPE
 IMPROVEMENTS); PLEASE PROVIDE A LETTER FROM FPL
 CONFIRMING/APPROVING OF THE RELOCATION OF THIS POLE AND
 THE VACATION/MODIFICATION OF THE EASEMENT.
  
 SITE PLANS AND CIVIL PLANS SHOW ON-STREET DROP-OFF,
 WHICH IS NOT PERMITTED WITHIN THE TOD DISTRICT ON
 BANYAN.
  
 A. PROPOSED RESIDENTIAL ON-STREET DROP OFF ON BANYAN
 FRONTAGE NOT PERMITTED WITHIN TOD-25 DISTRICT. [THIS IS
 AN EXISTING VESTED FEATURE WHICH THE APPLICANT BELIEVES
 OFFERS A SAFE PLACE OUTSIDE OF THE RIGHT OF AWAY FOR
 RESIDENTS TO BE PICKED UP BY RIDE SHARE PROVIDERS.]
  
 [NOT SATISFIED] REPEAT COMMENT. PROPOSED RESIDENTIAL
 ON-STREET DROP OFF ON BANYAN FRONTAGE NOT PERMITTED
 WITHIN TOD-25 DISTRICT.
  
 RESPECTFULLY NOTE, THERE ARE NO VESTED/CARRIED OVER
 APPROVALS, THIS IS A NEW SITE PLAN/PROJECT. PER SECTION
 94-111 TABLE IV-11: ON-STREET PASSENGER LOADING AND
 DROP-OFF IS NOT PERMITTED WITHIN THE TOD DISTRICT ALONG
 AVENUE STREET CLASSIFICATIONS (BANYAN BOULEVARD).
  
 ADDITIONALLY, THE PROPOSED DROP-OFF DIRECTLY CONFLICTS
 WITH THE NEW BANYAN STREETSCAPE. CONFLICTING WITH THE
 IMPROVED PEDESTRIAN ENVIRONMENT WITH THE BIKE
 LANE/SIDEWALK.
  
 8. SETBACKS ARE MEASURED FROM THE BACK OF CURB, NOT
 FROM THE PROPERTY LINE. [PLANS REVISED TO SHOW SETBACK
 FROM BACK OF CURB]
 A. SETBACK ON BANYAN (GROUND ? 5) IS 16? MIN. AND 50?
 MAX. (AVENUE-CLASSIFICATION) CONDITIONAL SETBACK FOR
 PARKING ABOVE 5TH STORY IS 31? MIN. [THE PLANS PROVIDED
 MEET THE REQUIRED SETBACK CRITERIA AND THE CONDITIONAL
 SETBACK FOR PARKING ABOVE 5TH STORY IS COMPLIANT]
 [PARTIALLY SATISFIED] THANK YOU FOR THE REVISIONS,
 BASED UPON THESE: PLEASE PROVIDE MAX SETBACK AND ANY
 APPLICABLE CONDITIONAL SETBACK LINES ON SITE PLANS,
 ELEVATIONS, AND RELEVANT FLOOR PLANS, UPDATE DATA TABLE
 ON SHEET A0-02 ACCORDINGLY TO REFLECT ALL PROVIDED
 SETBACKS PER FRONTAGE.
  
 B. SETBACK ON CLEARWATER (GROUND ? 5) IS 12? MIN. AND
 60? MAX. (SECONDARY-CLASSIFICATION) CONDITIONAL SETBACK
 FOR PARKING ABOVE 5TH STORY IS 27? MIN. [THE PLANS
 PROVIDED MEET THE REQUIRED SETBACK CRITERIA AND THE
 CONDITIONAL SETBACK FOR PARKING ABOVE 5TH STORY IS
 COMPLIANT]
 [SEE ABOVE]
  
 C. ABUTTING CSX IS 15? MIN. [ACKNOWLEDGED] [SATISFIED]
  
 D. REAR 5? MIN. [ACKNOWLEDGED] [SATISFIED]
  
 E. SIDE INTERIOR 0? OR NFPA [ACKNOWLEDGED] [SATISFIED]
  
 F. SETBACKS INTERNAL TO THE PROPERTY BETWEEN COUNTY
 ITC, SFRTA, AND APPLICANT?S PROPERTIES WARRANT FURTHER
 DISCUSSION. AS PREVIOUSLY STATED, THE PROJECT SITE IS
 SPLIT BETWEEN 2 SEPARATE PARCELS, AND POTENTIAL
 VERTICAL SUBDIVISION. [SETBACK AND SEPARATION WILL BE
 HANDLED BY SEPARATE AGREEMENT BETWEEN THE AFFECTED
 PARTIES]
 [NOT SATISFIED] FURTHER CLARIFICATION/DISCUSSIONS
 NEEDED WITH VERTICAL SUBDIVISION
  
 9. PARKING: THE PARKING TABLE NEEDS TO BE CORRECTED TO
 BETTER CONVEY THE PARKING COUNTS. PLEASE NOTE, WHILE
 NOT MANDATORY, STAFF HAS INCLUDED THE ADDITIONAL
 ALLOWED 25% TOD PARKING SPACE REDUCTION.
 ["SEE PARKING BREAKDOWN AND MIN MAX COMPARISON
 PROVIDED. THE TOTAL MINIMUM PARKING PERMITTED IS 1,684
 OR (1,347 LESS 20% REDUCTION FOR TOD)
  
 TOTAL MAXIMUM PARKING PERMITTED IS 3,142 OR (2,514 LESS
 20% REDUCTION FOR TOD)
  
 STRAIGHT CODE TEST:
  
 MINIMUM AND MAXIMUM RANGE WITHOUT TOD REDUCTION IS
 1,684 TO 3,142 SPACES. THEREFORE THE 2,003 PROPOSED
 SPACES IS COMPLIANT TO LDRS
  
 MINIMUM AND MAXIMUM RANGE WITH TOD REDUCTION IS 1,347
 TO 2,514 SPACES. THEREFORE THE 2,003 PROPOSED SPACES IS
 COMPLIANT TO LDRS EVEN WITH THE NON-MANDATORY 20%
 REDUCTION IMPOSED
  
 NON-CODE TEST EXCLUDING THE SFRTA AND COUNTY SPACES
 EVEN WITH THE SFRTA COUNTY SPACES COUNTED AS ALL BEING
 ABOVE MINIMUM THE PARKING PROVIDED WOULD STILL COMPLY
 WITH THE LDRS SEE BELOW:
  
 THE REQUIRED MINIMUM PARKING LESS THE SFRTA AND COUNTY
 275 SPACES WOULD BE 1,409 SPACES OR (1,127 SPACES
 REQUIRED IF THE 20% REDUCTION WAS APPLIED.)
  
 THE REQUIRED MAXIMUM PARKING LESS THE SFRTA AND COUNTY
 275 SPACES WOULD BE 2,867 SPACES OR (2,294 SPACES
 REQUIRED IF THE 20% REDUCTION WAS APPLIED.)
  
 MINIMUM AND MAXIMUM RANGE WITHOUT TOD REDUCTION IS
 1,409 TO 2,867 SPACE. THEREFORE, THE PROPOSED 2,003
 SPACES IS COMPLIANT TO LDRS EVEN IF THE 275 SPACES FOR
 THE SFRTA AND COUNTY WERE NOT RECOGNIZED AS A VALID
 PUBLIC USE.
  
 MINIMUM AND MAXIMUM RANGE WITH TOD REDUCTION IS 1,127
 TO 2,294 SPACE. THEREFORE, THE PROPOSED 2,003 SPACES
 WOULD STILL BE COMPLIANT TO LDRS EVEN WITH THE
 NON-MANDATORY 20% REDUCTION IMPOSED WITHOUT THE 275
 SPACES FOR THE SFRTA AND COUNTY BEING RECOGNIZED AS A
 VALID PUBLIC USE.
  
 THE 2003 SPACES PROVIDED IS WITHIN THE STATED MINIMUM
 AND MAXIMUMS PERMITTED BY CODE NO MATTER THE APPROACH
 USED.?]
 [PARTIALLY SATISFIED] REPEAT COMMENT FROM (2.D.)
  
 THANK YOU FOR PROVIDING THE NECESSARY DOCUMENTATION ON
 THE PSA AND ITS AMENDMENTS, IN ADDITION TO THE PARKING
 BREAKDOWN; BASED UPON THIS:
  
 THE HOTEL ROOM/AMENITY, RESIDENTIAL, RETAIL, OFFICE,
 GUEST AND SFRTA/COUNTY PARKING SPACES CHECK OUT WITH
 REQUIRED MINIMUMS AND 25% TOD REDUCTION.
  
 - CLARIFICATION, TABLE IV-9: MICRO-UNITS MINIMUM
 PARKING REQUIREMENT IS ZERO, NOT 1/13 UNITS. ONLY
 CAR-SHARE HAS 1/13 REQUIREMENT.
  
 - PLEASE MAKE CLEAR FROM THE TABLE PROVIDED, ARE YOU
 PROVIDING ONLY 13 SPACES FOR MICRO-UNITS? OR ARE YOU
 ARE PROVIDING 13 SPACES FOR MICRO-UNITS AND THEN
 ADDITIONAL 13 CAR-SHARE SPACES (26 TOTAL)? THE
 CAR-SHARE SPACES WOULD BE INDEPENDENT FROM OTHER
 PARKING AND DESIGNATED/RESERVED AS SUCH.
 PER SECTION 94-106 (8.A) A PROJECT WITH RESIDENTIAL
 MICRO-UNITS SHALL PROVIDE ON-SITE CAR-SHARE STATIONS ON
 A RATIO OF ONE PER EVERY 13 UNITS. THE TOTAL AMOUNT OF
 CAR-SHARE STATIONS MAY BE REDUCED BY ONE CAR-SHARE
 STATION PER EVERY 13 ON-SITE PARKING SPACES PROVIDED.
 THE TOTAL NUMBER OF CAR-SHARE STATIONS MAY BE ADJUSTED
 BASED ON CURRENT SYSTEM DEMANDS, BUT A MINIMUM OF ONE
 CAR-SHARE STATION SHALL BE PROVIDED. THE REMAINDER OF
 THE SPACES SHALL BE RESERVED FOR FUTURE SERVICE
 EXPANSION.
  
 A. OFFICE: MIN. 2.5/1000SF = 457 SPACES (MAX. 4/1000SF
 = 731 SPACES) AFTER 25% TOD REDUCTION, 343 REQUIRED;
 PROVIDING 365 SPACES [SEE ABOVE] [SATISFIED] OFFICE
 PARKING FALLS WITHIN MIN/MAX. CLARIFICATION, OFFICE
 MINIMUM IS 2.5/1000 SF NOT 2/1000 SF.
  
 B. HOTEL: MIN. 1/4ROOMS = 27 SPACES, 1/800 SF = 11
 SPACES (MAX. 1/ROOM = 108 SPACES, 1/400 SF = 23
 SPACES); AFTER 25% TOD REDUCTION, 29 REQUIRED;
 PROVIDING 38 SPACES [SEE ABOVE] [SATISFIED]
  
 C. COMMERCIAL: MIN. 2/1000 SF = 110 SPACES (MAX. 4/1000
 SF = 219 SPACES) AFTER 25% TOD REDUCTION, 83 REQUIRED;
 PROVIDING 110 SPACES [SEE ABOVE] [SATISFIED]
  
 D. RESIDENTIAL: MIN. 1/UNIT = 821 SPACE, 1/20 GUEST =
 41 GUEST (MAX. 2/UNIT = 1,642 SPACES, 41 GUEST) AFTER
 25% TOD REDUCTION, 661 REQUIRED; PROVIDING 896 SPACES
 TOTAL, NEED A CLEARER BREAKDOWN. [SEE PARKING DATA
 PROVIDED] [SATISFIED]
  
 E. MICRO-UNITS: MIN. 0/UNIT (MAX. 0.5/UNIT = 83 SPACES,
 1/20 GUEST = 8 SPACES); PROVIDING? NEED CLEARER
 BREAKDOWN. [SEE PARKING DATA PROVIDED] [PARTIALLY
 SATISFIED] PLEASE MAKE CLEAR FROM THE TABLE PROVIDED,
 ARE YOU PROVIDING ONLY 13 SPACES FOR MICRO-UNITS? OR
 ARE YOU ARE PROVIDING 13 SPACES FOR MICRO-UNITS AND
 THEN ADDITIONAL 13 CAR-SHARE SPACES (26 TOTAL)? THE
 CAR-SHARE SPACES WOULD BE INDEPENDENT FROM OTHER
 PARKING AND DESIGNATED/RESERVED AS SUCH.
 PER SECTION 94-106 (8.A) A PROJECT WITH RESIDENTIAL
 MICRO-UNITS SHALL PROVIDE ON-SITE CAR-SHARE STATIONS ON
 A RATIO OF ONE PER EVERY 13 UNITS. THE TOTAL AMOUNT OF
 CAR-SHARE STATIONS MAY BE REDUCED BY ONE CAR-SHARE
 STATION PER EVERY 13 ON-SITE PARKING SPACES PROVIDED.
 THE TOTAL NUMBER OF CAR-SHARE STATIONS MAY BE ADJUSTED
 BASED ON CURRENT SYSTEM DEMANDS, BUT A MINIMUM OF ONE
 CAR-SHARE STATION SHALL BE PROVIDED. THE REMAINDER OF
 THE SPACES SHALL BE RESERVED FOR FUTURE SERVICE
 EXPANSION.
  
 F. LIVE/WORK UNITS: MIN. 2/1000 SF = 534 SPACES (MAX.
 4/1000SF = 1068 SPACES); AFTER 25% TOD REDUCTION, 400
 REQUIRED; PROVIDING? NEED CLEARER BREAKDOWN. ALSO THERE
 ARE A TOTAL OF 12 LIVE/WORK UNITS FOR 267,000 SF,
 ASSUMING ~22,250 SF EACH? PLEASE EXPLAIN THESE UNITS.
 [THERE ARE NO LIVE WORK UNITS PROPOSED] [SATISFIED]
 JUSTIFICATION LETTER SPOKE TO PREVIOUS APPROVAL?S
 LIVE-WORK UNITS, THESE ARE NOT CARRIED OVER TO THE
 CURRENT PROJECT.
  
 G. SFRTA AND ITC PARKING: MIN. 290 SPACES (250 FOR
 SFRTA PATRONS AND 40 FOR SFRTA/COUNTY); PROVIDING 275?
 WHY THE SHORTAGE OF 15 SPACES PER THE PSA? [PSA (AS
 AMENDED) REQUIRES 275 SPACES 250 FOR SFRTA AND 25 FOR
 THE COUNTY] [SATISFIED] LATEST AMENDMENT TO PSA
 (EXHIBIT 2) THAT WAS PROVIDED WITH RESUBMITTAL STATES:
 250 PARKING SPACES FOR TRI-RAIL, AND 25 SPACES FOR
 COUNTY.
  
 H. TOTAL MIN REQUIRED: 1,467 SPACES (WITHOUT ANY FOR
 MICRO-UNITS AND NOT INCLUDING 534 FOR LIVE/WORK) 2001
 WITH LIVE/WORK INCLUDED; 2,291 WITH SFRTA/ITC PARKING.
 NOT COUNTING 25% REDUCTION. PROVIDING 2,003 SPACES WITH
 319 UNALLOCATED. EXPLAIN THE UNALLOCATED. [EVERY USE IS
 PARKED AT THE MINIMUM, ALL EXCESS SPACES HAVE BEEN
 POOLED TOGETHER IN THE UNALLOCATED CATEGORY SO THEY CAN
 BE USED AS FLEXIBLE OVER FLOW TO SERVE ENTIRE PROJECT
 WHEN NEEDED] [SATISFIED] PARKING TABLE/DATA PROVIDED.
  
 I. BIKE PARKING: MIN. 1/15 COMMERCIAL/HOTEL/OFFICE = 40
 SPACES REQUIRED, 1/15 RESIDENTIAL = 57 SPACES REQUIRED,
 ALSO NEED TO PROVIDE A SHOWER/CHANGING FACILITY WITHIN
 200 FT. OF BUILDING ENTRANCE. PROVIDING 116 COMMERCIAL,
 100 RESIDENTIAL. [COVERED BIKE PARKING IS PROVIDED AT
 THE GROUND FLOOR OF THE GARAGE. THE REQUIRED SHOWERING
 CHANGING FACILITY IS ALSO PROVIDED AND SHOWN ON THE
 LEVEL TWO PLAZA APPROXIMATELY 75 FEET NORTH OF OFFICE
 AND HOTEL LOBBY ENTRANCE. THESE FACILITIES ARE ALSO
 ACCESSIBLE FROM THE PARKING GARAGE SOUTHEAST ELEVATOR
 AND STAIR.] [NOT SATISFIED] UPON REVIEW OF RESUBMITTED
 PARKING DATA, REQUIRED SPACES ARE 1/15 SPACES
 (COMMERCIAL, OFFICE, HOTEL) AND 1/1 SPACES
 (RESIDENTIAL). TOTALING 35 AND 59 REQUIRED BIKE SPACES
 RESPECTIVELY. PLEASE PROVIDE TOTAL COUNT OF BIKE SPACES
 INTERNAL TO BUILDING ON SHEET A0-02, DIAGRAM ON A5-02
 PROVIDES 72 SPACES (2 PER RACK), REQUIREMENT IS 94 FOR
 THESE PROJECT USES.
  
 MICRO-UNIT PROVISIONS (PER. SEC. 94-106 8.A.) REQUIRES
 0.5 BICYCLE PARKING SPACES PER UNIT. REQUIRING ~ 83
 SPACES.
  
 BIKE SPACES SHALL BE DISTRIBUTED AMONGST THE
 BUILDINGS/VARIED USERS NOT CONCENTRATED WITHIN A SINGLE
 ROOM OR LOCATION. OFFICE/HOTEL USERS HAVE TO TRAVEL
 OVER 600 FT. TO ACCESS ENCLOSED BIKE PARKING.
 RETAIL/COMMERCIAL USERS ON BANYAN/CLEARWATER SIDE HAVE
 TO TRAVEL THE SAME 600+ FT. DISTANCE TO ACCESS SHOWERS.
 RECOMMEND THAT THE DISTRIBUTION SHOULD ENTAIL A MORE
 APT RATIO OR DISTRIBUTION OF ONE ENCLOSED/SECURED BIKE
 ROOM AND SHOWER FACILITY PER TOWER.
  
 I. PROVIDE SECURE RESIDENT BICYCLE ROOMS. PROVIDE
 NON-RESIDENTIAL COVERED BICYCLE PARKING AREAS
 DISTRIBUTED THROUGHOUT THE SITE. PROVIDE THE DIMENSIONS
 FOR THE BICYCLE PARKING AREAS ON THE PLANS. [COVERED
 SECURE BIKE PARKING IS PROVIDED AT THE GROUND FLOOR
 LEVEL OF THE GARAGE] [DETAILS AND DIMENSIONS PROVIDED]
 [NOT SATISFIED] UPON REVIEW OF RESUBMITTED PARKING
 DATA; BIKE PARKING INTERNAL TO BUILDING NEEDS TO MEET
 MINIMUM REQUIREMENTS OF 94 SECURED SPACES, GROUND FLOOR
 ONLY SHOWS 72 SPACES. NOT INCLUDING ADDITIONAL 83
 SPACES DEDICATED TO MICRO-UNIT USE. ON SHEETS A1-03,
 A1-04, AND A1-05 ROOM INTERNAL TO GARAGE LABELED
 ?SCOOTER/BIKE PARKING? HOW ARE THESE ROOMS/SPACES
 ACCESSED, ARE THERE ADDITIONAL RACKS LOCATED HERE, AND
 WHAT ARE THE DIMENSIONS? PLEASE PROVIDE MORE DETAILS OF
 THESE AREAS.
  
 REPEAT FROM (9.I.I.) BIKE SPACES SHALL BE DISTRIBUTED
 AMONGST THE BUILDINGS/VARIED USERS NOT CONCENTRATED
 WITHIN A SINGLE ROOM OR LOCATION. OFFICE/HOTEL USERS
 HAVE TO TRAVEL OVER 600 FT. TO ACCESS ENCLOSED BIKE
 PARKING. RETAIL/COMMERCIAL USERS ON BANYAN/CLEARWATER
 SIDE HAVE TO TRAVEL THE SAME 600+ FT. DISTANCE TO
 ACCESS SHOWERS. RECOMMEND THAT THE DISTRIBUTION SHOULD
 ENTAIL A MORE APT RATIO OR DISTRIBUTION, RECOMMEND ONE
 ENCLOSED/SECURED BIKE ROOM AND SHOWER FACILITY PER
 TOWER.
  
 ACCESS TO BIKE STORAGE LIMITED TO REAR ENTRANCE ON
 CSX/BANYAN CORNER OF THE SITE, NO INTERNAL ACCESS
 APPEARS TO BE AVAILABLE OUTSIDE OF CROSSING OVER THE
 ADA SPACES. PLEASE CONSIDER REVISIONS.
  
 II. WHERE ARE THE SHOWER/CHANGING FACILITIES LOCATED?
 [THE REQUIRED SHOWERING CHANGING FACILITY IS ALSO
 PROVIDED AND SHOWN ON THE LEVEL TWO PLAZA APPROXIMATELY
 75 FEET NORTH OF OFFICE AND HOTEL LOBBY ENTRANCE. THESE
 FACILITIES ARE ALSO ACCESSIBLE FROM THE PARKING GARAGE
 SOUTHEAST ELEVATOR AND STAIR.]
 [NOT SATISFIED] THANK YOU FOR PROVIDING SHOWER
 FACILITIES WITHIN THE PLAN, PLEASE LABEL AND INDICATE
 THESE CLEARLY. BASED UPON THE RESPONSE AND RESUBMITTAL:
  
 CLARIFICATION, ARE THESE THE THREE ORANGE ROOMS BETWEEN
 THE RETAIL BAYS ON SHEET A1-02? CAN THE SHOWER
 FACILITIES BE LOCATED CLOSER TO THE PROPOSED BIKE
 STORAGE ROOM OR BETTER DISTRIBUTED AMONG THE BUILDINGS?
  
 REPEAT FROM (9.I.I.) BIKE SPACES SHALL BE DISTRIBUTED
 AMONGST THE BUILDINGS/VARIED USERS NOT CONCENTRATED
 WITHIN A SINGLE ROOM OR LOCATION. OFFICE/HOTEL USERS
 HAVE TO TRAVEL OVER 600 FT. TO ACCESS ENCLOSED BIKE
 PARKING. RETAIL/COMMERCIAL USERS ON BANYAN/CLEARWATER
 SIDE HAVE TO TRAVEL THE SAME 600+ FT. DISTANCE TO
 ACCESS SHOWERS. RECOMMEND THAT THE DISTRIBUTION SHOULD
 ENTAIL A MORE APT RATIO OR DISTRIBUTION OF ONE
 ENCLOSED/SECURED BIKE ROOM AND SHOWER FACILITY PER
 TOWER.
  
 J. IN THOSE CASES WHERE THE SIDE OF ANY PARKING STALL
 IS ADJACENT TO A WALL, FENCE, BUILDING, OR OTHER
 PHYSICAL OBSTRUCTION, THE STALL WIDTHS SHALL BE
 INCREASED BY A MINIMUM OF ONE FOOT. WHERE THERE IS AN
 OBSTRUCTION ON BOTH SIDES OF THE STALL, THE STALL
 WIDTHS SHALL BE INCREASED BY A MINIMUM OF TWO FEET.
 [ACKNOWLEDGED - WE WILL BE UTILIZING THE ALLOWABLE
 PARKING REDUCTIONS AND OR USING COMPACT SPACE
 PROVISIONS TO ENSURE PROPER SEPARATION IS MAINTAINED]
 [NOT SATISFIED] PLEASE PROVIDE DIMENSIONS OR DETAILS
 INDICATING SEPARATION IS MAINTAINED. PLEASE FOLLOW SEC.
 94-485 (N.)(1.) FOR SMALL CAR SPACE REQUIREMENTS, AND
 OUTLINE PERCENTAGE/INDICATE ON DRAWINGS ACCORDINGLY.
  
 III. PARKING GARAGE HAS INSTANCES WHERE PARKING SPACES
 APPEAR TO BE NEXT TO WALLS OR STRUCTURE. [ADJUSTMENTS
 TO BE MADE AS INDICATED ABOVE ON FINAL PERMITS TO
 ENSURE COMPLIANCE] [NOT SATISFIED] SEE ABOVE
  
 IV. ADA PARKING SPACES ARE LOCATED IN INEFFICIENT AND
 NOT OPTIMAL AREAS. ALL SPACES SHALL HAVE ACCESS TO A
 CURB RAMP OR CURB CUT, WHEN NECESSARY, TO ALLOW
 ENTRANCE TO THE BUILDING SERVED. SPACES SHALL BE
 LOCATED SO THAT USERS ARE NOT COMPELLED TO WALK OR
 OTHERWISE MOVE BEHIND PARKED VEHICLES, EXCLUDING OTHER
 VEHICLES PARKED IN ADJACENT PARKING SPACES FOR THE
 DISABLED. [ADA SPACES HAVE BEEN ADJUSTED TO PROVIDE
 EFFICIENT ACCESS ROUTES TO AND FROM ENTRY POINTS OR
 ELEVATOR CORES] [NOT SATISFIED] THANK YOU FOR PROVIDING
 ADJUSTMENTS AND ALTERING PLANS, BASED UPON THESE
 CHANGES:
  
 ADA DISTRIBUTION AFTER RECONFIGURATION STILL POSES
 QUESTIONS FOR CLARIFICATION.
  
 A) PLEASE PROVIDE CLARIFICATION OF HOW ADA PATRONS OF
 OFFICE, HOTEL, RETAIL, AND TRI-RAIL USERS WILL SAFELY &
 EFFICIENTLY ACCESS THESE FACILITIES FROM THE GARAGE.
  
 B) CURRENT ADA SPACE DISTRIBUTION ON SHEET A1-02 (FOR
 SFRTA PATRONS AND COUNTY EMPLOYEES) FORCES ADA USERS TO
 TRAVEL THROUGH RESIDENTIAL LOBBY ELEVATORS TO ACCESS
 REST OF SITE. DISTRIBUTION OF ADA SPACES ON THIS LEVEL
 SHALL PROVIDE SHORTEST/MOST EFFICIENT PATH TO END USE,
 ADA SPACES SHOULD BE LOCATED AT THE ELEVATOR SHAFT
 CONNECTED TO UPPER PLAZA AND THE ELEVATOR SHAFT CLOSEST
 TO THE TRI-RAIL PEDESTRIAN BRIDGE.
  
 C) IS THE INTENTION FOR GENERAL PUBLIC WITH ADA NEEDS
 TO ACCESS REST OF SITE/RETAIL VIA ELEVATORS THROUGH THE
 RESIDENTIAL TOWERS?
  
 D) GROUND LEVEL, THE ADA VAN SPACE AT THE END OF THE
 ROW FORCES USERS TO WALK BEHIND OTHER PARKED CARS TO
 ACCESS DOORS TO BIKEROOM/OUTSIDE. ADA CODE LANGUAGE
 MORE RESTRICTIVE THAN ZONING PROVISION. THIS SPACE IS
 NOT COMPLIANT AND WILL NEED TO BE RELOCATED/REMOVED
 FROM HOW IT IS CURRENTLY SHOWN.
  
 E) GROUND ITC ADA PATH FOR VANS, NOT THE CLOSEST/MOST
 EFFICIENT OR DIRECT ACCESS TO REST OF SITE, ONLY
 BENEFITS RETAIL SPACES ALONG THE CSX FRONTAGE. BETTER
 DISTRIBUTION WOULD BE AROUND UPPER LEVEL ELEVATOR
 SHAFTS.
  
 V. PLEASE PROVIDE PARKING PAINTED STRIPING DETAILS THAT
 MEET THE CITY STANDARDS OF SEC. 94-485. [PLANS AMENDED
 TO INCLUDE DETAILS] [SATISFIED]
 VI. PLEASE PROVIDE ALL PARKING DIMENSIONS FOR DRIVE
 AISLE, PARKING RAMP SLOPE, PARKING STALLS, ETC. [PLANS
 AMENDED TO INCLUDE DETAIL AND DIMENSIONS] [SATISFIED]
  
 K. PARKING STRUCTURE RAMP SLOPES: INTERNAL RAMPS APPEAR
 15.8% AND 12.4%. PER SEC. 94-111 (Q.)(2.) IF THE RAMP
 IS GREATER THAN 14 PERCENT, A BREAK-OVER TRANSITION
 SHALL BE REQUIRED. [TYPICAL CODE COMPLAINT DIMENSIONS
 PROVIDED. RAMP SLOPE AMENDED TO PROVIDE COMPLAINT SLOPE
 OR BREAK-OVER TRANSITION] [SATISFIED]
  
 L. INTERNAL PARKING STRUCTURE POSES CONCERNS WITH
 INGRESS/EGRESS OF RESIDENTS, EMPLOYEES, VISITORS, AND
 THE OPERATIONS OF LOADING AND BICYCLE USERS. LOADING
 SPACES AND BAYS ARE INEFFICIENT AND CAUSE CONFLICT
 ZONES/SAFETY CONCERNS. POTENTIAL SPILLBACK AND QUEUING
 ISSUES ONTO CLEARWATER. [WE DISAGREE. LOADING AND
 ACCESS IS EFFICIENT AND MEETS CODE THE CONCEPT TO
 CREATE A SINGULAR GARAGE TO SERVE THE ENTIRE
 DEVELOPMENT AS A TRANSIT FACILITY. THE IDEA IS TO NOT
 PARK THE SITE AS A TYPICAL DEVELOPMENT WITH GARAGES
 PROVIDED IN EACH BUILDING BUT RATHER A MORE URBAN
 CONCEPT THAT PARKS CARS CENTRALLY TO THE DEVELOPMENT
 WITH PATRONS AND RESIDENTS WALKING THE SHORT DISTANCE
 TO AND FROM THE INTENDED END USE WITHOUT HAVING TO
 REPARK.]
  
 [NOT SATISFIED] PLEASE PROVIDE JUSTIFICATION FOR DOUBLE
 INGRESS RAMP AND DOUBLE EGRESS RAMP.
  
 GROUND LEVEL LOADING BAYS AND OPERATION CREATES CLEAR
 CONFLICT POINTS AND IS A TRAFFIC/SAFETY HAZARD WITH
 INGRESS/EGRESS OF PATRONS TO THE UPPER LEVELS OF THE
 GARAGE AND GROUND LEVEL ADA ACCESS. QUEUING AND
 SPILLBACK IS AN INEVITABILITY DURING OPERATIONAL HOURS.
  
 AUTOTURN FOR DELIVERIES POSES CONFLICT POINTS WITH ADA
 AND OTHER OPERATIONS, INTERSECTS WITH DOWNWARD RAMP.
  
 INTERNAL GARAGE CIRCULATION ALTERNATING ACROSS LEVELS
 WITH ONE-WAY/TWO-WAY AISLES POSES CONCERNS.
  
 IS THE INTENTION FOR GENERAL PUBLIC TO ACCESS REST OF
 SITE/RETAIL VIA ELEVATORS THROUGH THE RESIDENTIAL
 TOWERS?
  
 REPEAT COMMENT PORTION OF (9.J.IV.A.) PLEASE PROVIDE
 CLARIFICATION OF HOW GENERAL PUBLIC/USERS OF OFFICE,
 HOTEL, RETAIL, AND TRI-RAIL USERS WILL EFFICIENTLY
 ACCESS THESE FACILITIES FROM THE CENTRALLY LOCATED
 GARAGE.
  
 M. THE PARKING GARAGE SHOULD BE PREWIRED FOR EV
 CHARGERS BOTH FOR RESIDENTS AND CUSTOMERS. THE
 ELECTRICAL ROOMS NEED TO BE PROVIDED WITH SUFFICIENT
 SPACE TO ACCOMMODATE THE REQUIRED ELECTRICAL PANELS AND
 AREAS NEED TO BE DESIGNATED FOR THE TRANSFORMERS.
 [ACKNOWLEDGED] [PARTIALLY SATISFIED] IF YOU PLAN TO
 PROVIDE EV SPACES AT THIS TIME, PLEASE SHOW WHERE THESE
 ARE LOCATED.
  
 10. CURB-CUTS AND PASSENGER LOAD/DROP-OFF: PER SEC.
 94-111 TABLE IV-11 ? TOD DOES NOT PERMIT ON-STREET
 AND/OR PASSENGER DROP-OFF OR LOADING ON AVENUE
 (BANYAN). [ONE CURB CUT HAS BEEN REMOVED FROM THE
 BANYAN. ALL OTHER CURB CUTS AND PASSENGER PICK UP
 LOCATIONS HAVE BEEN PREVIOUSLY APPROVED IN THEIR
 PRESENT LOCATIONS. ONE AND ONE PASSENGER DROP OFF CURB
 CUT WAS REMOVED ON BANYAN] [NOT SATISFIED] BASED UPON
 THE RESUBMITTED DOCUMENTS:
 [REPEAT COMMENT] PROPOSED RESIDENTIAL ON-STREET DROP
 OFF ON BANYAN FRONTAGE NOT PERMITTED WITHIN TOD-25
 DISTRICT.
  
 THERE ARE NO VESTED/CARRIED OVER APPROVALS, THIS IS A
 NEW SITE PLAN/PROJECT. PER SECTION 94-111 TABLE IV-11:
 ON-STREET PASSENGER LOADING AND DROP-OFF IS NOT
 PERMITTED WITHIN THE TOD DISTRICT ALONG AVENUE STREET
 CLASSIFICATIONS (BANYAN BOULEVARD).
  
 ADDITIONALLY, THE PROPOSED DROP-OFF DIRECTLY CONFLICTS
 WITH THE NEW BANYAN STREETSCAPE.
  
 CURB-CUT ON BANYAN FOR NONCOMPLIANT PASSENGER DROP-OFF
 IS STILL SHOWN ON ALL RESUBMITTED SITE PLANS, LANDSCAPE
 PLANS, AND ENGINEERING PLANS.
  
 STAFF DOES NOT SUPPORT THE RESIDENTIAL DROP-OFF FOR THE
 MIDDLE RESIDENTIAL TOWER ALONG CLEARWATER. PROPOSED
 SEPARATE DROP-OFF ROADWAY DOES NOT MAKE SENSE
 OPERATIONALLY AND DOES NOT REFLECT A SAFE/PLEASANT
 PEDESTRIAN ENVIRONMENT OR BUILT UP URBAN CONTEXT.
 CREATES A VEHICULAR-FOCUSED SPACE WITH NARROW LANDSCAPE
 BUFFER, PEDESTRIANS ARE BOUNDED BY 2 TRAVEL LANES.
 BUILDING WOULD BE BETTER ORIENTED CLOSER TOWARD
 CLEARWATER DR. ACTIVATING THE FRONTAGE, WITH THE
 DROP-OFF LOCATED AT THE REAR OF THE BUILDING, IN PLACE
 OF OR ALONG THE PROPOSED LOADING AREA. PROVIDES THE
 MOST DIRECT ROUTE INTO THE GARAGE FOR VALET SERVICES
 AND AVOIDS ADDITIONAL CIRCULATION.
 A TYPE A PORTE-COCHERE OFF CLEARWATER IS MORE
 COMPATIBLE AND APPROPRIATE FOR THIS SPACE, IF A
 DROP-OFF IS NEEDED ALONG THE RESIDENTIAL FRONTAGE.
 SIMILAR TO EXISTING ITC DROP-OFF IN FRONT OF
 HOTEL/OFFICE.
  
 THE NUMBER OF ACCESS POINTS ONTO EACH RIGHT OF WAY
 EXCEEDS THE 2 PERMITTED VIA SEC. 94-312 AND NO PROPERTY
 SHALL HAVE A TOTAL OF MORE THAN 4 ACCESS POINTS. WILL
 REQUIRE AN ADDITIONAL VARIANCE REQUEST.
  
 WIDTH OF CURB-CUT BETWEEN RESIDENTIAL TOWERS EXCEEDS
 PERMITTED 25FT. APPEARS TO BE 30 FT. + PLEASE PROVIDE
 DIMENSIONS OF ALL CURB CUTS/DRIVE ACCESS.
  
 WIDTH OF CURB-CUT BETWEEN RESIDENTIAL TOWER AND
 HOTEL/OFFICE TOWER EXCEEDS PERMITTED 25FT. APPEARS TO
 BE 30 FT. + PLEASE PROVIDE DIMENSIONS OF ALL CURB
 CUTS/DRIVE ACCESS.
  
 WIDTH OF CURB-CUTS FOR THE ITC BUS LOOP EXCEEDS
 PERMITTED 25 FT. INGRESS WIDTH NEARLY 60 FT. EGRESS
 APPROXIMATELY 40-45FT. PLEASE PROVIDE DIMENSIONS OF ALL
 CURB CUTS/DRIVE ACCESS.
  
 WIDTH OF CURB-CUTS FOR THE GARAGE INGRESS/EGRESS
 EXCEEDS PERMITTED 25 FT. WIDTH NEARLY FT. PLEASE
 PROVIDE DIMENSIONS OF ALL CURB CUTS/DRIVE ACCESS.
  
 PLEASE PROVIDE AUTO-TURN ANALYSIS FOR THE ITC/BUS LOOP
 OPERATION.
  
 11. PLEASE PROVIDE AN FAR AND GBA DIAGRAM SHOWING THE
 BREAKDOWN OF THE PROJECT?S COUNTED/UNCOUNTED ROOMS AND
 SPACES. [PLANS UPDATED TO PROVIDE FAR GBA DIAGRAMS]
 A. GROSS BUILDING AREA MEANS THE TOTAL FLOOR AREA OF A
 BUILDING, INCLUDING AIR-CONDITIONED OR FULLY ENCLOSED
 STORAGE SPACES, ENCLOSED AREAS ON THE ROOFTOP, SUCH AS
 BATHROOMS AND LOBBIES, STAIRS AND ELEVATOR AREAS, AND
 EXTERNAL UNENCLOSED CIRCULATION AREAS. THE GROSS
 BUILDING AREA DOES NOT INCLUDE PARKING AREAS;
 UNENCLOSED COLONNADES, PORCHES AND BALCONIES;
 MECHANICAL AND ELECTRICAL SPACES; AND TRASH ROOMS.
 STORAGE SPACES WITHOUT WINDOWS AND ENCLOSED BY SURFACES
 THAT ALLOW FOR NATURAL VENTILATION OR OUTSIDE AIR
 CIRCULATION SHALL NOT BE INCLUDED. [ACKNOWLEDGED]
 [NOT SATISFIED] GROUND LEVEL A6-01, ENCLOSED BIKE
 STORAGE ROOM COUNTS TOWARD GBA/FAR.
  
 VII. GROSS BUILDING AREA REQUIREMENTS:
 1. ANY PORTION OF THE PARKING AREA WHICH EXCEEDS THE
 MAXIMUM PARKING RATIO SHALL BE INCLUDED IN THE
 CALCULATIONS OF GROSS BUILDING AREA. THIS SHALL INCLUDE
 STALLS AND ALL ASSOCIATED CIRCULATION AREAS. [PROJECT
 PARKING PROVIDED IS WITHIN THE MINIMUM AND MAXIMUM
 RANGE PERMITTED AND DOES NOT COUNT TOWARD GBA OR THE
 FAR CALCULATIONS] [SATISFIED]
  
 2. PARKING LOCATED BELOW GRADE SHALL NOT BE COUNTED AS
 PART OF THE GROSS BUILDING AREA. [ACKNOWLEDGED]
 [SATISFIED]
  
 3. THE GROSS BUILDING AREA SHALL BE MEASURED FROM THE
 OUTSIDE FACE OF EXTERIOR WALLS. [ACKNOWLEDGED]
 [SATISFIED]
  
 12. PLEASE PROVIDE ACTIVE USE DIAGRAM AND CALCULATIONS
 FOR SITE FRONTAGES. [ACTIVE USE DIAGRAM PROVIDED ON
 REVISED PLANS] [SATISFIED]
  
 13. IT APPEARS THAT THE ELEVATION DRAWINGS DO NOT MATCH
 THE GROUND LEVEL SITE PLAN. THE ELEVATION DRAWINGS MUST
 INCLUDE HORIZONTAL DIMENSIONS FOR THE VARIOUS FEATURES
 SO THAT STAFF CAN VERIFY THAT THE ELEVATIONS MATCH THE
 SITE PLAN BUT ALSO THAT THE SITE FRONTAGES COMPLY WITH
 THE VARIOUS ZONING REQUIREMENTS. [CHECKED FOR ACCURACY
 AND REVISE AS NEEDED] [NOT SATISFIED] AN EXAMPLE ON
 SHEET A2-01 DETAIL ON THE HOTEL/OFFICE TOWER SHOWS A
 SUPPORT COLUMN NOT ILLUSTRATED WITHIN THE SITE PLANS.
 ADDITIONAL COLUMN SHOWN IN ELEVATION ADJACENT TO THE
 SPIRAL STAIRCASE FEATURE, NOT SHOWN IN SITE PLAN.
 ADDITIONALLY, PLEASE PROVIDE ALL ENTRANCES, DOORS, ETC.
 ON GROUND-LEVEL SO STAFF CAN VERIFY ELEMENTS MATCH SITE
 PLAN. ALL PLANS NEED TO SHOW CONSISTENT AND ACCURATE
 INFORMATION.
  
 14. PLEASE SPECIFY THE TYPE OF OPEN SPACES (PRIVATE &
 PUBLIC) PROVIDED ON THE DRAWINGS, REFERENCE SEC. 94-109
 AND TABLE IV-7. CLARIFY HOW THE REQUIREMENTS OF EACH
 OPEN SPACE TYPE IS MET WITHIN THE LANDSCAPE DRAWINGS.
 [TYPE OF OPEN SPACES HAVE BEEN PROVIDED ON THE
 LANDSCAPE CALCULATIONS SHEET.]
  
 THANK YOU FOR PROVIDING OPEN SPACES AND CALCULATIONS
 SHEET, BASED ON WHAT WAS SUBMITTED:
  
 [NOT SATISFIED] PUBLIC OPEN SPACE ON CORNER OF
 CLEARWATER & BANYAN LABELED AS COURTYARD, THIS TYPE OF
 PUBLIC SPACE IS NOT PERMITTED IN TOD-25 DISTRICT.
 GARDEN COURTYARD CLASSIFICATION IS PERMITTED. (TABLE
 IV-6)
  
 SHEET L002 (LANDSCAPE CALCULATIONS) MISLABELED
 COURTYARD IS ON GROUND LEVEL, GARDEN PLAZA IS ON 2ND
 LEVEL, CHECK SF DIMENSIONS.
 GARDEN PLAZA HAS A MINIMUM 50% VEGETATED AREA, GARDEN
 COURTYARD HAS A MINIMUM 50% VEGETATED.
  
 GARDEN PLAZA HAS A MINIMUM 50% TREE CANOPY, GARDEN
 COURTYARD HAS A MINIMUM 50% TREE CANOPY.
  
 SPECIFY SEATING REQUIREMENTS AND HOW THEY ARE MET
 WITHIN THE PROPOSED PUBLIC OPEN SPACES.
  
 L005 (GROUND LEVEL OPEN SPACE PLAN) OPEN SPACE 1A, 1B,
 1C LABELED AS COURTYARD, THIS TYPE OF PUBLIC SPACE IS
 NOT PERMITTED IN TOD-25 DISTRICT. GARDEN COURTYARD
 CLASSIFICATION IS PERMITTED (TABLE IV-6).
  
 ACTIVE USE ABUTMENT FOR GARDEN COURTYARD IS 2 SIDES OR
 75%. ROW ABUTMENT FOR GARDEN COURTYARD IS 1 SIDE OR
 20%.
  
 OPEN SPACE 2A ON SHEET L005 (GROUND LEVEL OPEN SPACE
 PLAN) IS INCORRECTLY LABELED AS INTERIOR COURTYARD,
 THIS IS A PRIVATE OPEN SPACE CLASSIFICATION AND IS NOT
 PERMITTED WITHIN TOD-25 SUBDISTRICT. PLEASE IDENTIFY
 THE CORRECT TYPE OF PUBLIC OPEN SPACE THIS IS. NOTE
 PUBLIC OPEN SPACES ARE TO BE ON THE GROUND LEVEL, WILL
 REQUIRE VARIANCE/WAIVER FROM THE DAC.
  
 OPEN SPACE 4A ON SHEET L005 (GROUND LEVEL OPEN SPACE
 PLAN) DOES NOT MEET THE ACTIVE USE ABUTMENT REQUIRED (1
 SIDE OR 20%).
  
 OPEN SPACE 4A AND 4B ON SHEET L005 (GROUND LEVEL OPEN
 SPACE PLAN) TERRACE VEGETATED AREA REQUIREMENT IS 20%
 (OKAY TO EXCEED REQUIREMENT, PLEASE ADJUST TABLE TO
 CORRECTLY REFLECT REQUIREMENTS)
  
 OPEN SPACE 4A AND 4B ON SHEET L005 (GROUND LEVEL OPEN
 SPACE PLAN) SHOULD BE LABELED AS THE REQUIRED ROOFTOP
 GARDEN. MINIMUM REQUIREMENTS INCLUDE 50% VEGETATED AREA
 AND 50% TREE CANOPY.
  
 STAFF IS UNABLE TO VERIFY COMPLIANCE UNTIL THE OPEN
 SPACES HAVE BEEN CORRECTLY DESIGNATED/IDENTIFIED AND
 PROPER REQUIREMENTS LISTED.
  
 A. PROPOSED OPEN SPACE AT THE SOUTHERN TRIANGLE OF THE
 SITE DOES NOT MEET PUBLIC OR PRIVATE OPEN SPACE
 TYPOLOGY DUE TO LACK OF ABUTMENT TO AN ACTIVE USE.
 [THIS IS A BONUS OPEN SPACE DESIGNED TO SERVE THE SFRTA
 AND ITC CUSTOMERS DURING OPERATING HOURS. THIS AREA
 ABUTS THE ACTIVE MASS TRANSIT USE TRAIN PLATFORM AND
 ITC FACILITY AND PROVIDES A SPACE FOR CUSTOMERS TO
 RELAX IN THE SUNNY LANDSCAPE PARKLIKE AREA WHILE
 WAITING TO MAKE THEIR TRANSIT CONNECTIONS.]
 [NOT SATISFIED]
 PER SECTION 94-109 OPEN SPACE, PRIVATE - IF PRIVATE
 OPEN SPACE IS LOCATED ON THE GROUND FLOOR AND LOCATED
 ALONG THE LOT FRONTAGE, IT SHALL BE DESIGNED IN
 COMPLIANCE WITH THE PUBLIC OPEN SPACE REQUIREMENTS, AND
 IT SHALL BE ACCESSIBLE BY THE PUBLIC FOR PUBLIC USE.
  
 B. THE PUBLIC OPEN SPACE SHOWN ON THE SECOND LEVEL
 REQUIRES THE APPROVAL OF A VARIANCE, SIMILAR TO THE ONE
 APPROVED AS PART OF THE CURRENTLY APPROVED SITE PLAN.
 [SEE ABOVE] [ACKNOWLEDGED. THIS WOULD ALLOW THE SAME
 RAISED OPEN SPACE CONDITION TO OCCUR AS PREVIOUSLY
 APPROVED]
 [NOT SATISFIED] WILL REQUIRE VARIANCE/WAIVER FROM THE
 DAC.
  
 15. STREET TREES: STREET TREES SHALL BE PLANTED AT 30
 FT. INTERVALS ALONG EACH STREET FRONTAGE. CLEARWATER
 FRONTAGE SHOULD HAVE APPROX. 46 TREES AND BANYAN
 FRONTAGE APPROX. 13. [NOTED. STREET TREE CALCULATIONS
 HAVE BEEN UPDATED ACCORDINGLY.]
 [SATISFIED]
  
 16. PROPOSED RESIDENTIAL DROP-OFF AND LOOP FOR
 RESIDENTIAL TOWER ON CLEARWATER IS OUTSIDE OF PROPERTY
 LINES AND ENCROACHES INTO CITY ROW. ADDITIONAL SMALLER
 DROP-OFF ADJACENT TO LOADING BAY/BACK-OF-HOUSE. WHY ARE
 THESE DROP-OFF SPACES NEEDED FOR THE RESIDENTIAL TOWER?
 ADJACENT HOTEL/OFFICE ALSO INCLUDES A SMALL DROP-OFF,
 PRESENTS STACKING/QUEUING ISSUES AND SPILL OVER INTO
 CLEARWATER. STAFF DOES NOT SUPPORT THE RESIDENTIAL
 DROP-OFF ROAD ADJACENT TO RESIDENTIAL TOWER/CLEARWATER
 PROPOSED RESIDENTIAL DROP-OFF NOT IN COMPLIANCE.
 ENCROACHES INTO THE PUBLIC RIGHT-OF-WAY AND PER SEC.
 94-111 (N.)(3.) DESIGNATED PASSENGER LOADING AND
 DROP-OFF AREAS SHALL BE SET BACK A MINIMUM OF 16 FEET
 FROM THE BACK OF CURB, SHALL BE SEPARATED FROM THE
 SIDEWALK BY A 5-FOOT-WIDE LANDSCAPE BUFFER AND SHALL BE
 SUBJECT TO APPROVAL BY THE CITY TRAFFIC ENGINEER. PORTE
 COCHERES ARE SUBJECT TO MINIMUM STANDARDS DEPENDING ON
 SUBDISTRICT LOCATION AND ADJACENCY TO A STREET
 DESIGNATION AND ARE SEPARATED INTO TWO TYPES WHICH ARE
 ILLUSTRATED IN FIGURE IV-22. ONLY A TYPE A PORTE
 COCHERE IS ALLOWED IN THE TOD-25 SUBDISTRICT. [THIS
 DROP OFF LOOP FEATURE HAS BEEN REVISED AND APPROVED BY
 PBC SO THAT IT IS NO LONGER WITHIN THE RIGHT OF WAY AND
 ALSO TO ADD EXTRA SPACING FOR A VEGETATED BUFFER AND
 DROP OFF RELATED USES.]
 THANK YOU FOR CONSIDERATIONS AND REVISIONS FROM THE
 PREVIOUS SUBMITTAL, BASED UPON THE NEW PLANS PROVIDED:
  
 STAFF DOES NOT SUPPORT THE RESIDENTIAL DROP-OFF FOR THE
 MIDDLE RESIDENTIAL TOWER ALONG CLEARWATER. PROPOSED
 SEPARATE DROP-OFF ROADWAY DOES NOT MAKE SENSE
 OPERATIONALLY AND DOES NOT REFLECT A SAFE/PLEASANT
 PEDESTRIAN ENVIRONMENT OR BUILT UP URBAN CONTEXT.
 CREATES A VEHICULAR-FOCUSED SPACE WITH NARROW LANDSCAPE
 BUFFER, PEDESTRIANS ARE BOUNDED BY 2 TRAVEL LANES.
 BUILDING WOULD BE BETTER ORIENTED CLOSER TOWARD
 CLEARWATER DR. ACTIVATING THE FRONTAGE, WITH THE
 DROP-OFF LOCATED AT THE REAR OF THE BUILDING, IN PLACE
 OF OR ALONG THE PROPOSED LOADING AREA. PROVIDES THE
 MOST DIRECT ROUTE INTO THE GARAGE FOR VALET SERVICES
 AND AVOIDS ADDITIONAL CIRCULATION. NEW CONFIGURATION
 WITH REVERSAL IN DIRECTION NOT EFFICIENT OR OPTIMAL.
 A TYPE A PORTE-COCHERE OFF CLEARWATER IS MORE
 COMPATIBLE AND APPROPRIATE FOR THIS SPACE, IF A
 DROP-OFF IS NEEDED ALONG THE RESIDENTIAL FRONTAGE.
 SIMILAR TO EXISTING ITC DROP-OFF IN FRONT OF
 HOTEL/OFFICE.
  
 A. INSTEAD, THE BUILDING FRONT SHOULD BE MOVED CLOSER
 TO CLEARWATER, AND RECONFIGURE LOADING AND
 BACK-OF-HOUSE TO INCLUDE THE DRIVEWAY AND DROP OFF
 AREA. [SEE ABOVE COMMENT.] [REPEAT COMMENT] SEE ABOVE
  
 B. SEE ABOVE: PROPOSED LOADING SPACE ON RESIDENTIAL
 TOWER DOES NOT FUNCTION FOR VEHICULAR MOVEMENT.
 [LOADING AREA WAS REVISED TO PROVIDE IMPROVED LOADING
 VEHICLE ACCESSIBILITY. SEE SHEET C-03] [NOT SATISFIED]
 PLEASE PROVIDE DIMENSIONS OF THE REVISED LOADING
 SPACES, ADA SPACE PROPOSED INBETWEEN LOADING
 OPERATIONS?
  
 WHAT IS THE DISTANCE BETWEEN THE INTERSECTION OF
 CLEARWATER TO THE REVISED HOTEL/OFFICE DROP-OFF LOADING
 SPACE?
  
 17. ITC BUS LOOP IS NOW ENTIRELY COVERED OVERHEAD BY
 PLAZA AND BUILDINGS/STRUCTURES. PREVIOUS DESIGN HAD AN
 OPEN-AIR CORRIDOR TO PROVIDE LIGHT, LANDSCAPING, AND
 VENTILATION/OPEN-AIR ACCESS. HOW WILL THE REMOVAL OF
 THESE ELEMENTS BE MITIGATED OR COMPENSATED FOR,
 ESPECIALLY WHERE ANY MECHANICAL VENTING WILL BE
 LOCATED? [THE ITC IS NOW COMPLETELY ENCLOSED UNDER AND
 WITHIN THE PARKING STRUCTURE. A NEW LANDSCAPED OPEN
 SPACE IS PROVIDED ADJACENT TO THE SOUTH END OF THE ITC.
 THIS AREA IS ACCESSIBLE TO TRANSIT PATRONS SO THEY CAN
 GET SUN OR SIT IN SHADE WITHIN A LANDSCAPE AREA WHILE
 WAITING FOR THEIR TRANSIT CONNECTION]
 [PARTIALLY SATISFIED] NOTE, PER SECTION 94-109 OPEN
 SPACE, PRIVATE - IF PRIVATE OPEN SPACE IS LOCATED ON
 THE GROUND FLOOR AND LOCATED ALONG THE LOT FRONTAGE, IT
 SHALL BE DESIGNED IN COMPLIANCE WITH THE PUBLIC OPEN
 SPACE REQUIREMENTS, AND IT SHALL BE ACCESSIBLE BY THE
 PUBLIC FOR PUBLIC USE.
  
 18. PLEASE PROVIDE SHEETS AND DRAWINGS IDENTIFYING HOW
 THE FA?ADE ARTICULATION REQUIREMENTS ARE MET FOR THE
 PROJECT. PLEASE REFERENCE SEC. 94-109 AND TABLE IV-4:
 FA?ADE ARCHITECTURAL REQUIREMENTS. [PLANAR BREAKS AND
 BUILDING LENGTH DIAGRAMS ARE PROVIDED]
 [PARTIALLY SATISFIED] DIAGRAMS ARE PROVIDED
 A. ILLUSTRATE TRANSPARENCY CALCULATIONS, FENESTRATION
 CALCULATIONS, PLANAR BREAK CALCULATIONS, PROJECTIONS,
 ETC. FOR ALL BUILDING FACADES. [TRANSPARENCY,
 FENESTRATION, PLANAR BREAK CALCULATIONS, FOR ALL
 BUILDING FACADES PROVIDED.]
 [NOT SATISFIED] FOR GROUND FLOOR TO PODIUM (UP TO 7TH
 FLOOR IN TOD-25 DISTRICT)
  
 SHEET A5-05, A5-06, BALCONIES FOR THE RESIDENTIAL
 BUILDINGS DO NOT CONSTITUTE AS PLANAR BREAKS, AS THESE
 ARE JUST ?PUNCH OUTS? ALONG THE SAME BUILDING FACE.
 PORTIONS OF THE FA?ADE ITSELF NEEDS TO BE RECESSED OR
 PROTRUDE TO A DEPTH OF AT LEAST 3FT.
  
 SHEET A-5-07 SATISFIES PLANAR BREAK REQUIREMENTS.
  
 PLEASE PROVIDE MORE DETAIL FOR THE GARAGE SCREENING. IS
 THE GREEN-WALL LIVING PLANT MATERIAL; IF SO WHAT KIND
 OF PLANTS ARE PROVIDED/HOW IS THIS
 MAINTAINED/IRRIGATED? ARE THE GREEN-WALL SECTIONS
 RECESSED FROM THE METAL SCREENING?
  
 TRANSPARENCY REQUIREMENTS APPEAR TO BE MET BASED UPON
 ELEVATIONS PROVIDED. PLEASE PROVIDE CALCULATIONS WITHIN
 TABLE OR ON DRAWINGS.
  
  
 19. PLEASE PROVIDE DETAILS AND MATERIALS OF THE GARAGE
 STRUCTURE, HOW IS IT BEING SCREENED, MATERIALS, PLANTS,
 ETC. [GENERAL SPECIFICATION FOR GARAGE FACADE SCREENING
 MATERIALS ADDED TO ELEVATIONS]
 PLEASE PROVIDE MORE DETAIL FOR THE GARAGE SCREENING. IS
 THE GREEN-WALL LIVING PLANT MATERIAL; IF SO WHAT KIND
 OF PLANTS ARE PROVIDED/HOW IS THIS
 MAINTAINED/IRRIGATED? ARE THE GREEN-WALL SECTIONS
 RECESSED FROM THE METAL SCREENING? ARE THERE OTHER
 RECESSED PORTIONS/PLANAR BREAKS WITHIN THE SCREENING TO
 BREAK UP THE MASS? PLEASE PROVIDE MORE DETAIL INTO
 SCREENING GRAPHIC, COLOR, & TREATMENT.
  
 20. REGARDING THE ARCHITECTURAL DESIGN OF THE TOWERS,
 HAS VARIED FACADES AND ELEMENTS BEEN EXPLORED OR IS
 THERE A REASON FOR UNVARIED/SIMILARLY DESIGNED TOWERS?
 [THE PROPOSED PROJECT DESIGN WAS CREATED AND EXECUTED
 PERSONALLY BY ARCHITECT BERNARDO FORT-BRESCIA OF
 ARQUITECTONICA. THE PROJECT DESIGN IS EXTREMELY WELL
 BALANCED WHILE REPRESENTING ARQ'S SIGNATURE MODERN
 STYLIZATION THROUGHOUT THE COHESIVE DESIGN]
 NOTED. PREVIOUS APPROVAL FOR TRANSIT VILLAGE HAD
 INCORPORATED FAR MORE VARIATION IN MASSING AND
 ARCHITECTURAL FEATURES THAT RESPECTED THE CONTEXT OF
 THE SURROUNDING BUILT ENVIRONMENT AND HISTORIC ELEMENTS
 ADJACENT TO THE SITE.
  
 - GARAGE SCREENING PRESENTS A STARK CONTRAST BETWEEN
 THE HISTORIC SEABOARD TRAIN STATION AND PRESENTS AN
 OPPORTUNITY TO EXPLORE ALTERNATIVE COLOR SCHEMES,
 SCREENING/MESH, GRAPHICS, RECESSES/PROTRUSIONS, ETC.
 WITHIN ITS DESIGN. THE GARAGE SCREENING SHOULD RESPECT
 OR PRESENT THESE SPACES IN A MORE COHESIVE MANNER.
 CURRENTLY THE TRAIN-STATION SITS IN FRONT OF A MASSIVE
 BLOCKY BACKDROP AND GETS LOST.
 - THE WATER TREATMENT FACILITY ON BANYAN IS ALSO AN
 HISTORIC SITE WITHIN THE SHADOW OF THE RESIDENTIAL
 TOWER. PREVIOUS APPROVAL FEATURED A ?STEP-BACK? OR
 ?STAIRCASE? MASSING TO LOWER THE SCALE TOWARD
 BANYAN/WATER TREATMENT FACILITY, AND THE TRAIN STATION
 ALONG TAMARIND. RECOMMEND PURSUING A SIMILAR CONCEPT TO
 BETTER SCALE AND FRAME THE MASSINGS.
 - REGARDING THE HOTEL/OFFICE TOWER, PREVIOUS APPROVAL
 PROVIDED ADDITIONAL SPACING AND STEPPED BACK FURTHER
 FROM THE SEABOARD TRAIN STATION, PROVIDING A MORE
 APPROPRIATELY SCALED PEDESTRIAN ENVIRONMENT THAT DIDN?T
 OVERSHADOW THE HISTORIC BUILDING BELOW. ADDITIONALLY,
 THE BLUE FA?ADE TREATMENT OR PAINTING IS ANOTHER STARK
 CONTRAST TO THE TRAIN STATION, PLEASE EXPLORE MORE
 COMPATIBLE COLOR SCHEMES (E.G. EARTH TONES)
  
 21. REGARDING THE TOWERS AND OVERALL PROJECT HEIGHT,
 STAFF REQUESTS THAT THE BANYAN RESIDENTIAL TOWER IS THE
 TALLEST RATHER THAN THE CLEARWATER HOTEL/OFFICE TOWER.
 THIS IS BECAUSE BANYAN IS THE WIDEST ROADWAY AND IS
 MORE APPROPRIATELY FRAMED/CAN ACCOMMODATE THE TALLER
 MASS. ADDITIONALLY, STAFF RECOMMENDS THAT THE BANYAN
 RESIDENTIAL TOWER STEPS DOWN IN SOME CAPACITY TOWARD
 TAMARIND AVE. AS WAS APPROVED WITHIN THE ORIGINAL SITE
 PLAN. THIS GIVES RESPECT TO THE SCALE OF THE SEABOARD
 TRAIN STATION AND PUBLIC REALM ALONG TAMARIND.
 [ACKNOWLEDGED BUT WE DO NOT AGREE WITH THE PROPOSED
 DESIGN SUGGESTIONS]
 SEE PREVIOUS COMMENT
  
 22. BE COGNIZANT THAT THE EDGE 2 BUILDING LOCATED AT
 300 CLEARWATER IS APPROVED AND UNDERGOING BUILDING
 PERMITTING PROCESS, THIS PROJECT?S INGRESS/EGRESS FROM
 DRIVES MAY PRESENT CONFLICT POINTS. THE GROUND LEVEL
 PLANS NEED TO SHOW THE EDGE 2 CURB CUTS IN ORDER FOR
 STAFF TO EVALUATE THE IMPACT OF THE ACCESS POINTS TO
 CLEARWATER. ADDITIONALLY, THE PEDESTRIAN CONNECTION
 FROM THE ?OASIS? PARK ELEMENT ACROSS CLEARWATER TO THE
 STAIRWELL/ELEVATOR FOR THE UPPER PLAZA WILL NEED
 RECONSIDERATION WITH THE INCOMING DEVELOPMENT. [WE WILL
 COORDINATE PROJECT FEATURES AS NEEDED]
 [PARTIALLY SATISFIED] THANK YOU FOR OVERLAYING PORTIONS
 OF THE ADJACENT PROPERTIES/ROW CONTEXT. THE CURB CUTS
 FOR EDGE 2 BUILDING ACROSS FROM SITE NEED TO BE REVISED
 AND REALIGNED TO ACCURATELY REFLECT CONDITIONS.
  
 23. PLEASE CLARIFY GROUND FLOOR PEDESTRIAN CIRCULATION
 WITH ITC, ACCESSING UPPER PLAZA SPACES, AND INTERNAL
 CIRCULATION BETWEEN RETAIL AND RESIDENTIAL TOWERS. IS
 THE ITC BUS LOOP SEPARATED/CLOSED OFF IN THE EVENINGS
 WHEN BUS OPERATIONS HALT, HOW IS WAYFINDING ADDRESSED
 TO ACCESS THE UPPER PLAZA SPACES? [PATRONS WILL BE
 QUEUED BY FENCING, GATES, LIGHTING, AND WAY FINDING
 SIGNAGE]
  
 [NOT SATISFIED] IS THE INTENTION FOR GENERAL PUBLIC TO
 ACCESS REST OF SITE/RETAIL VIA ELEVATORS THROUGH THE
 RESIDENTIAL TOWERS?
  
 REPEAT COMMENT PORTION OF (9.J.IV.A.) PLEASE PROVIDE
 CLARIFICATION OF HOW GENERAL PUBLIC/USERS OF OFFICE,
 HOTEL, RETAIL, AND TRI-RAIL USERS WILL EFFICIENTLY
 ACCESS THESE FACILITIES FROM THE GARAGE.
  
 DRAWINGS INDICATE THAT THE CROSS-WALK FROM THE SOUTHERN
 SIDE OF THE HOTEL/OFFICE TOWER STILL EXISTS/WILL
 REMAIN. PLEASE ADJUST PLANS/DRAWINGS ACCORDINGLY.
 PLEASE PROVIDE JUSTIFICATION/CLARIFICATION OF WHY THIS
 CROSSWALK IS BEING REMOVED.
  
 PLEASE PROVIDE ELEVATIONS/RENDERS OF THE PROPOSED
 SPIRAL STAIRCASE/ELEVATOR ON CLEARWATER DR. FOR THE
 UPPER PLAZA. PUBLIC ACCESS TO UPPER PLAZA FROM THIS
 STAIRCASE IS NOT OBVIOUS; PLEASE PROVIDE ADDITIONAL
 CONTEXT DISPLAYING THIS ENTRANCE.
  
 STAFF SUGGESTS AN ADDITIONAL STAIRWELL OR ACCESS POINT
 FROM THE SOUTHERN END OF THE OFFICE/HOTEL TOWER FROM
 THE DECK/PLAZA TO PROVIDE ADDITIONAL CIRCULATION
 BETWEEN ITC/SFRTA AND UPPER PLAZA.
  
 A. THE ITC ADA PATH DRAWING SUBMITTED WITH THE
 APPLICATION SHOWS THE ADA ROUTE UTILIZING A CROSSWALK
 THAT IS DESIGNATED FOR REMOVAL. [THIS ADA PATHWAY AND
 CROSSWALK WILL BE REMOVED PURSUANT TO THE COUNTY
 REQUEST TO REMOVE THEM.]
 [NOT SATISFIED] DRAWINGS INDICATE THAT THE CROSS-WALK
 FROM THE SOUTHERN SIDE OF THE HOTEL/OFFICE TOWER STILL
 EXISTS/WILL REMAIN. PLEASE ADJUST PLANS/DRAWINGS
 ACCORDINGLY. PLEASE PROVIDE JUSTIFICATION/CLARIFICATION
 OF WHY THIS CROSSWALK IS BEING REMOVED.
  
 B. THE ITC FENCE EXHIBIT SHOWS THE FENCE AROUND THE
 OPEN SPACE AT THE SOUTH END OF THE SITE AS A ?PRIVATE
 PARK FENCE?. THIS DOES NOT MATCH THIS AS BEING DEPICTED
 AS PUBLIC OPEN SPACE ON OTHER PLANS. [THIS IS A BONUS
 OPEN SPACE AREA DESIGNED TO BE OPERATED IN CONJUNCTION
 WITH THE SFRTA PLATFORM AND ITC OPERATION. THIS AREA
 WILL BE CLOSED TO PUBLIC ACCESS WHEN THE ITC IS CLOSED]
 [NOT SATISFIED]
 PER SECTION 94-109 OPEN SPACE, PRIVATE - IF PRIVATE
 OPEN SPACE IS LOCATED ON THE GROUND FLOOR AND LOCATED
 ALONG THE LOT FRONTAGE, IT SHALL BE DESIGNED IN
 COMPLIANCE WITH THE PUBLIC OPEN SPACE REQUIREMENTS, AND
 IT SHALL BE ACCESSIBLE BY THE PUBLIC FOR PUBLIC USE.
  
 24. STAFF WILL BE RECOMMENDING PEDESTRIAN IMPROVEMENTS
 AND INCREASED ACCESSIBILITY TO TAMARIND AND THE
 DOWNTOWN AREA. AS A TOD PROJECT, YOU MUST DEMONSTRATE
 HOW THE RELATION AND CONNECTIVITY IS IMPROVED TO THESE
 CORRIDORS INTO THE DOWNTOWN. RECOMMEND POTENTIAL: WORK
 WITH SFRTA TO IMPLEMENT AT-GRADE CONNECTION(S) ACROSS
 RAILS TO TAMARIND. IMPROVE THE PEDESTRIAN BRIDGE
 CONNECTING SEABOARD TRAIN STATION AND TRANSIT VILLAGE
 PROJECT. EXPLORE CONCEPT OF ADDITIONAL PEDESTRIAN
 BRIDGES OR CONNECTIONS. [THE REVISED PROJECT DESIGN
 PROVIDES ACCESSIBILITY TO THE GARAGE, RETAIL, BIKE
 STORAGE, ITC AND RAIL FACILITIES FROM BOTH BANYAN
 BOULEVARD AND CLEARWATER DRIVE. THESE ACCESS POINTS ARE
 PROVIDED UNDER COVERED WALKWAYS AND THEY HAVE ACTIVE
 USES PROVIDED ALONG THEIR FRONTAGES. THE NEW ACCESS
 POINT FROM BANYAN ALONG THE WEST SIDE OF THE TRACKS NOW
 PROVIDES A DIRECT ROUTE BACK TOWARD BANYAN BOULEVARD]
 [NOT SATISFIED] PLEASE CLARIFY OR MARK ON PLANS THE NEW
 ACCESS POINT FROM BANYAN. NOT UNDERSTANDING THE
 INCREASED ACCESSIBILITY AND PEDESTRIAN IMPROVEMENT
 DESCRIBED. ADDITIONALLY STAFF RECOMMENDS AN ADDITIONAL
 STAIRWELL OR ACCESS POINT FROM THE SOUTHERN END OF THE
 OFFICE/HOTEL TOWER FROM THE DECK/PLAZA TO PROVIDE
 ADDITIONAL CIRCULATION BETWEEN ITC/SFRTA AND UPPER
 PLAZA.
  
 25. PLEASE PROVIDE INFORMATION ON WHAT THE ?MOTOR
 LOBBY? IS. [IT IS SMALL LOBBY FOR THE OFFICE AND HOTEL
 AT THE GROUND LEVEL INTENDED TO PROVIDE GROUND FLOOR
 ACCESS TO VEHICLES PICKING UP AND DROPPING OFF PATRONS,
 MAIL PACKAGES, LUGGAGE, ETC.] [SATISFIED]
  
 26. THE SOUTH RESIDENTIAL BUILDING IS NOT PERMITTED TO
 ENCROACH THE 20-FOOT FIRE DEPARTMENT ACCESS EASEMENT.
 NOTE: EVEN WITHOUT THE BUILDING ENCROACHMENT, THIS DOES
 NOT FUNCTION. [THIS FIRE ACCESS IS NOT REQUIRED AND IS
 PROPOSED TO BE REMOVED]
  
 [NOT SATISFIED] PLEASE PROVIDE EVIDENCE OF EASEMENT
 REMOVAL AND FIRE DEPT. APPROVAL.
  
 27. PROVIDE TURNING DIAGRAMS FOR THE LOADING AREAS
 UNDER THE NORTH BUILDING, ENTRY POINTS TO THE SITE AND
 THE OTHER LOADING AREAS. [AUTO TURN EXHIBITS PROVIDED]
 BASED UPON THE AUTOTURNS PROVIDED:
 [NOT SATISFIED] PLEASE PROVIDE JUSTIFICATION FOR DOUBLE
 INGRESS RAMP AND DOUBLE EGRESS RAMP.
  
 GROUND LEVEL LOADING BAYS AND OPERATION CREATES CLEAR
 CONFLICT POINTS AND IS A TRAFFIC/SAFETY HAZARD WITH
 INGRESS/EGRESS OF PATRONS TO THE UPPER LEVELS OF THE
 GARAGE AND GROUND LEVEL ADA ACCESS. QUEUING AND
 SPILLBACK IS AN INEVITABILITY DURING OPERATIONAL HOURS.
  
 AUTOTURN FOR DELIVERIES POSES CONFLICT POINTS WITH ADA
 AND OTHER OPERATIONS INTERSECTS WITH DOWNWARD RAMP.
  
 INTERNAL GARAGE CIRCULATION ALTERNATING ACROSS LEVELS
 WITH ONE-WAY/TWO-WAY AISLES POSES CONCERNS.
  
 IS THE INTENTION FOR GENERAL PUBLIC TO ACCESS REST OF
 SITE/RETAIL VIA ELEVATORS THROUGH THE RESIDENTIAL
 TOWERS?
  
 REPEAT COMMENT PORTION OF (9.J.IV.A.) PLEASE PROVIDE
 CLARIFICATION OF HOW GENERAL PUBLIC/USERS OF OFFICE,
 HOTEL, RETAIL, AND TRI-RAIL USERS WILL EFFICIENTLY
 ACCESS THESE FACILITIES FROM THE GARAGE.
  
 PLEASE PROVIDE DIMENSIONS FOR LOADING BAY ON THE GROUND
 FLOOR
  
 SHEET C-19 SHOWS ARROW IN OPPOSITE DIRECTION OF
 RESIDENTIAL DROP-OFF TRAFFIC FLOW
  
 28. WHERE ARE THE GENERATORS, TRANSFORMERS, AND OTHER
 MECHANICAL EQUIPMENT AND HOW ARE THEY SCREENED IN
 ACCORDANCE WITH CITY CODE REQUIREMENTS? [LABELED ON
 PLANS] [NOT SATISFIED]
 SHEET C-05 & C-04 SHOW FDC IN WITHIN THE MIDDLE OF BIKE
 RACKS, OR EXPOSED WITHIN ROW.
  
 PLEASE WALL-MOUNT ANY WATER METERS, FIRE/CHECK/CONTROL
 VALVES, ETC. WHENEVER POSSIBLE.
  
 ANY EXPOSED MECHANICAL EQUIPMENT, METERS, OR VALVES
 SHALL BE SCREEENED FROM VIEW WITH LANDSCAPING.
  
 29. PLEASE CONSIDER USING SUSTAINABLE INFRASTRUCTURE
 SUCH AS ROOFTOP SOLAR OR RAINWATER CAPTURE/REUSE
 CISTERNS.
  
 NO RESPONSE PROVIDED. WHILE NOT REQUIRED, HAS THIS ITEM
 BEEN GIVEN ANY CONSIDERATION?
  
 30. SHEET A6-01 SHOWS PUBLIC OPEN SPACES EXTENDING INTO
 THE BUS LANE. [LANDSCAPE PLANS HAVE BEEN UPDATED
 REDUCING THE OPEN SPACES OUTSIDE OF THE BUS LANES.][
 PLANS REVISED TO REMOVE SIDEWALK SERVING BUS LANE FROM
 THE OPEN SPACE] [SATISFIED] LANDSCAPE NO LONGER
 ENCROACHES/OVERLAPS
  
 31. FOR THE EVENTUAL DOWNTOWN ACTION COMMITTEE (DAC)
 MEETING, PLEASE PROVIDE FULLY DETAILED RENDERINGS AND
 PERSPECTIVE DRAWINGS OF THE FINAL PROJECT.
 [ACKNOWLEDGED]
  
 [PARTIALLY SATISFIED] PLEASE NOTE, ALL PROVIDED
 RENDERINGS ARE ONLY OF THE TAMARIND AND BANYAN
 PERSPECTIVES. THERE ARE NO RENDERS SHOWN FOR CONDITIONS
 ALONG CLEARWATER DR.
  
 PLEASE PROVIDE DETAILS/RENDERS OF THE SPIRAL
 STAIRCASE/ELEVATOR SHAFT USED TO ACCESS THE UPPER
 PUBLIC OPEN SPACE/PLAZA.
  
 32. PROVIDE A PRELIMINARY CONSTRUCTION PLAN TO SHOW HOW
 THE SITE WILL BE DEVELOPED WHILE MAINTAINING ITC
 OPERATIONS, TO INCLUDE PARKING. ADDITIONALLY, PROVIDE
 THE PRELIMINARY PLAN FOR EMPLOYEE AND CONTRACTOR
 PARKING DURING CONSTRUCTION. [THIS IS A PERMITTING
 ISSUE THAT REQUIRES CONSIDERABLE COORDINATION AND WILL
 BE ADDRESSED PRIOR TO BUILDING PERMITS BEING ISSUED
 PLEASE CARRY FORWARD AS A CONDITION OF APPROVAL. NOTE
 THAT AS PART OF THE PSA, WE ARE REQUIRED TO PROVIDE THE
 COUNTY WITH A CONTINUOUS OPERATONS PLAN. THE PLAN IS TO
 RELOCATE PALM TRAN TO THE EAST SIDE OF THE TRACKS, AS
 IS UNDER DISCUSSION AMONG THE CITY, THE COUNTY AND
 APPLICANT.]
 [ACKNOWLEDGED]
  
 THERE ARE COLUMN LOCATIONS THAT WHEN COMBINED WITH THE
 LOCATION OF THE PROPOSED ITC FENCE CREATE CHOKE POINTS
 FOR THE BUS PATRONS AS THEY CHANGE BETWEEN ROUTES.
 WHILE THEY ALL APPEAR TO COMPLY WITH ADA MINIMUMS, THEY
 DO NOT PROVIDE COMFORTABLE PEDESTRIAN WIDTHS FOR TWO
 USERS TO PASS SIDE-BY-SIDE. PLEASE REVIEW. [IN GENERAL
 THE PLAN IS TO START CONSTRUCTION ON THE NON ITC
 NORTHERN PORTION UNTIL THE ITC IS RELOCATED TO THE
 TAMARIND SIDE THEN BUILD THE ITC PORTION]
 [ACKNOWLEDGED]
  
 33. THE SITE, LANDSCAPE AND CIVIL PLANS ALL NEED TO
 SHOW CONSISTENT, CODE COMPLIANT CONDITIONS. [PLANS
 COORDINATED][NOT SATISFIED] ARCHITECTURAL, LANDSCAPE,
 AND CIVIL PLANS ALL FEATURE INCONSISTENCIES OR ELEMENTS
 NOT COMPLIANT WITH CODE, PLEASE REVISE.
  
 EXAMPLES INCLUDE:
 - BANYAN PEDESTRIAN DROP-OFF, WHICH IS NOT PERMITTED,
 IS STILL SHOWN ACROSS ALL PLANS.
 - CROSSWALK AT THE ENTRANCE OF ITC STILL SHOWN ON
 PLANS, BUT COMMENTS/REFERENCES STATE IT IS TO BE
 REMOVED.
 - ELEVATIONS FEATURE COLUMNS NOT PRESENT IN GROUND
 FLOOR PLANS.
 - ETC.
  
 34. PROVIDE VERIFICATION THAT THE PROJECT MEETS THE
 STREETSCAPE REQUIREMENTS OF SECTION 94-113. THIS
 INCLUDES LIGHTING, SIDEWALK WIDTH, LANDSCAPE, BICYCLE
 PARKING, STREET FURNITURE, ETC. [NOTED][ THE PROJECT
 COMPLIES WITH STREETSCAPE REQUIREMENTS OF SECTION
 94-113.]
 [NOT SATISFIED] PLEASE PROVIDE DIMENSIONS FOR SIDEWALK
 WIDTHS AND CLEAR PATHS, PLEASE PROVIDE A LOCATION
 CALLOUT, DIMENSIONS, AND COUNT OF BICYCLE RACKS
 PROVIDED FOR PUBLIC ACCESS (REQUIREMENT IS 1 SPACE PER
 100 FT. OF STREET FRONTAGE).
  
 35. PROVIDE COMPLIANCE WITH SEC. 94-106 ? GENERAL USES
 WITH SPECIAL REQUIREMENTS (8.A) MICRO-UNITS
 (A.-F.)[NOTES ADDED TO PLAN TO SHOW COMPLIANCE WITH
 MINIMUM AVERAGE AND OTHER DWELLING UNITS REQUIREMENTS]
 A. MICRO-UNIT MEANS A SMALL RESIDENTIAL UNIT WITH A
 TOTAL SQUARE FOOTAGE BETWEEN 300 SQUARE FEET AND 549
 SQUARE FEET, WITH A FULLY FUNCTIONING KITCHEN AND
 BATHROOM. [REGULAR UNITS WILL COMPLY TO ALL REGULATIONS
 THERE ARE ALSO COMPLAINT MICRO UNITS THAT ARE LESSED
 OUT FORM THE REGULAR UNIT AVERAGE CALCULATION ]
 B. SEC. 94-109 ?DWELLING UNIT REQUIREMENTS
 VIII. DWELLING UNITS SHALL NOT BE LESS THAN 550 SQUARE
 FEET. IN MULTIPLE DWELLING UNIT BUILDINGS, THE
 CUMULATIVE AVERAGE OF ALL DWELLING UNITS SHALL NOT BE
 LESS THAN 800 SQUARE FEET.
 IX. SMALLER DWELLING UNITS MAY BE ALLOWED AS
 MICRO-UNITS. THE CUMULATIVE AVERAGE SIZE MINIMUM SHALL
 NOT BE APPLICABLE TO MULTIPLE DWELLING UNIT BUILDINGS
 WHERE MICRO-UNITS COMPOSE A MINIMUM OF 80 PERCENT OF
 THE TOTAL NUMBER OF UNITS. IN ALL OTHER CASES, THE
 CUMULATIVE AVERAGE SIZE OF ALL DWELLING UNITS SHALL NOT
 INCLUDE THE MICRO-UNITS IN SUCH CALCULATION. SEE
 MICRO-UNITS. [ACKNOWLEDGED]
 [NOT SATISFIED] PLEASE PROVIDE CLARIFICATION FOR THE
 PARKING PROVIDED FOR MICRO-UNITS, IF ITS 13 CAR-SHARE
 ALONE OR IF ITS 13 SPACES AND 13 CAR-SHARE (26 TOTAL).
 PLEASE PROVIDE FINAL COUNT AND LOCATION FOR THE
 REQUIRED 0.5 BIKE SPACES PER UNIT.
  
 PLEASE NOTE CONDITION OF APPROVAL FOR MICRO-UNITS WILL
 INVOLVE A CONTRIBUTION TO THE CITY TROLLEY FEE PER UNIT
 PER MONTH.
  
  
 ADDITIONAL COMMENTS BASED UPON RESUBMITTED DOCUMENTS,
 SHEETS, AND REVISED PLANS: 7/5/22
  
 1. REVISE LIST OF VARIANCES BASED UPON CORRECTIONS TO
 OPEN SPACE, CURBCUT WIDTHS, PLANAR BREAKS/FA?ADE
 ARTICULATION, ETC. ANY DEVIATION FROM REQUIRED MINIMUMS
 OR MAXIMUMS CONSTITUTES A REQUEST FOR VARIANCE.
  
 2. FA?ADE ARTICULATION ? PLEASE PROVIDE MORE DETAILS
 FOR THE GARAGE SCREENING, GREEN-WALL, AND PLANAR
 BREAKS.
  
 3. PLEASE PROVIDE ALL NECESSARY APPROVALS FROM FIRE
 DEPARTMENT, UTILITY PROVIDERS, FPL, ETC. FOR THE
 VACATING/MODIFICATION OF ANY EASEMENTS AND STRUCTURES.
  
 4. ON SITE PLANS, THE CROSSWALK AT THE INTERSECTION OF
 CLEARWATER/BANYAN NOT REFLECTIVE OF EXISTING BANYAN
 STREETSCAPE, THERE ARE SEPARATE BIKELANE AND PEDESTRIAN
 CROSSING LANE
  
 5. SHOW SETBACK LINES ON THE ELEVATIONS
  
 6. PLEASE PROVIDE CIRCULATION DIAGRAM OR ILLUSTRATE ALL
 INTERIOR DOORS/ENTRYWAYS TO, FROM, AND BETWEEN ROOMS,
 ENCLOSURES, RETAIL SPACES, ETC. (GROUND FLOOR FOR
 EXAMPLE ONLY SHOWS DOORS TO TR, BIKE ROOM, AND
 EXTERNAL/FA?ADE ROOMS) HELPS CLARIFY INTERNAL
 CIRCULATION OF PATRONS.
  
 7. PRIVATE OPEN SPACE ON GROUND FLOOR, REQUIRED TO BE
 DESIGNED TO MEET PUBLIC OPEN SPACE REQUIREMENTS.
  
 8. MAXIMUM FOOTPRINT LENGTH EXCEEDS 350 FT. FOR TOD-25
 WOULD REQUIRE VARIANCE.
  
  
 9. PLEASE PROVIDE A PHOTOMETRIC PLAN, SITE ILLUMINATION
 MINIMUM REQUIREMENT IS 0.6 FOOTCANDLES AS MEASURED AT
 THE BACK EDGE OF THE CURB AND ONE FOOT ABOVE THE
 SIDEWALK.
  
 10. PLEASE FULLY DIMENSION SITE PLANS AND DRAWINGS, OR
 PROVIDE SEPARATE SHEETS OF DIMENSIONED SITE PLANS AND
 DRAWINGS, VERY LITTLE SPATIAL INFORMATION IS PROVIDED
 WITHIN PLANS.
  
 SIDEWALK WIDTHS, CURB-CUTS, LANDSCAPE BEDS, PLANAR
 BREAK DEPTHS, FRONTAGES, SETBACKS, PROPERTY LINES, ETC.
  
 11. BASED UPON THE RESUBMITTED DOCUMENTS AND REVISED
 DRAWINGS, THE EXISTING ON-STREET PARKING ALONG
 CLEARWATER DRIVE HAS BEEN REMOVED. THE REMOVAL OF
 METERED ON-STREET PARKING WILL INCUR A FEE. PLEASE
 CONTACT ED DAVIS FROM PARKING TO CLARIFY FEES
 ASSOCIATED WITH THESE SPACES. [email protected]
  

Review Stop Z ZONING
Rev No 1 Status F Date 05-12-2022 Cont ID  
Sent By ckimmerl Date 05-12-2022 Time 12:41 Rev Time 0.00
Received By ckimmerl Date 05-12-2022 Time 12:40 Sent To  
Notes
2022-05-12 12:41:22CASE NO. FSPR 22-05
 TRANSIT VILLAGE 2022
 150 CLEARWATER DRIVE
  
 - CONTACT CHRIS KIMMERLY @ (561) 822-1426,
 [email protected]
 - OR ERIC SCHNEIDER @ (561) 822-1446,
 [email protected]
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF THREE
 (3) PAPER COPIES AND AN ELECTRONIC COPY IN .PNG AND
 .PDF FORMAT OF ALL PLANS. PLEASE NOTE THAT CHANGES ON
 THE RESUBMITTED PLANS OR THE SUBMITTAL OF
 INFORMATION/PLANS TO ADDRESS THE COMMENTS MAY RESULT IN
 ADDITIONAL COMMENTS.
  
 - THE PPRC COMMENTS SHALL BE SUFFICIENTLY ADDRESSED AND
 SUBMITTED TO THE PLANNING DIVISION BY 5 PM ON FRIDAY,
 05/27/22, TO BE ELIGIBLE TO BE SCHEDULED FOR THE
 7/13/22 DOWNTOWN ACTION COMMITTEE MEETING.
  
 - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT
 RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS
 FROM THE DATE OF THE PPRC MEETING (BY AUGUST 12, 2022),
 THE PLANNING DIVISION MAY NOTIFY THE APPLICANT THAT THE
 CASE IS CONSIDERED WITHDRAWN. ANY FURTHER ACTION SHALL
 REQUIRE A NEW DEVELOPMENT APPLICATION.
  
 - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($500).
  
 1. THIS PROPOSED PROJECT IS SIGNIFICANTLY DIFFERENT
 THAN THE CURRENTLY APPROVED SITE PLAN; THEREFORE, IT IS
 NOT A ?MODIFICATION TO THE EXISTING APPROVED SITE PLAN?
 AS STATED IN THE JUSTIFICATION STATEMENT, BUT RATHER A
 NEW SITE PLAN APPROVAL. THE PREVIOUSLY APPROVED SITE
 PLAN AND THE VARIANCES THAT WERE GRANTED DO NOT
 AUTOMATICALLY APPLY TO THE NEW SITE PLAN. ANY VARIANCES
 THAT ARE REQUIRED BASED ON THE NEW BUILDING DESIGN AND
 SITE LAYOUT REQUIRE APPROVAL BY THE DOWNTOWN ACTION
 COMMITTEE THROUGH THE VARIANCE PROCESS.
  
 2. STAFF HAS NOTED THAT THE PROPOSED SITE PLAN,
 INCLUDING THE USE MIX, DIFFERS FROM THE AGREEMENT FOR
 PURCHASE AND SALE DATED AUGUST 12, 2012. SINCE THE
 AGREEMENT FOR PURCHASE AND SALE ESTABLISHES THAT
 MODIFICATIONS ARE PERMITTED, SUBJECT TO PALM BEACH
 COUNTY APPROVAL, PLEASE PROVIDE THE LATEST AMENDMENT OR
 VERSION OF THE AGREEMENT FOR PURCHASE AND SALE THAT
 AUTHORIZES THE CHANGES PRESENTED IN THE CURRENT
 SUBMITTAL, INCLUDING, BUT NOT LIMITED TO:
  
 A. THE REDUCTION IN THE REQUIRED 40 PARKING SPACES FOR
 SFTRA/COUNTY STAFF AND 250 SFRTA PATRON PARKING SPACES
 (TOTAL 290 PARKING SPACES) TO 275 PARKING SPACES FOR
 THESE USERS.
 B. THE REMOVAL OF LEARNING CENTER/CULTURAL/EDUCATION
 USES FROM THE PROJECT.
 C. THE JUSTIFICATION STATEMENT SITE DATA TABLE LISTS 42
 WORKFORCE HOUSING UNITS AS BEING REQUIRED, WHILE THE
 AGREEMENT FOR PURCHASE AND SALE ONLY REQUIRES 38. THE
 PLANS DO NOT PROVIDE A BREAKDOWN TO VERIFY COMPLIANCE
 WITH EITHER NUMBER.
 D. SECTION 3E OF EXHIBIT D TRAFFIC CIRCULATION PLAN OF
 THE AGREEMENT FOR PURCHASE AND SALE LIMITS THE NUMBER
 OF PARKING SPACES WITHIN THE PARKING GARAGE TO THE 290
 PUBLIC USE PARKING SPACES AND, ??PROVIDE NOT MORE THAN
 THE NUMBER OF PARKING SPACES REQUIRED BY THE CITY OF
 WEST PALM BEACH FOR THE MIX OF USES AND
 INTENSITIES/DENSITIES?AS ACTUALLY CONSTRUCTED??. AS
 WILL BE SHOWN LATER IN THESE COMMENTS, THE PROJECT
 EXCEEDS THIS STANDARD.
  
 3. THE SITE CURRENTLY CONSISTS OF A PBC PARCEL AND AN
 SFTRA PARCEL.
 A. THE DECKS, COLUMNS AND A PORTION OF THE RETAIL
 BUILDING ON THE SOUTH END OF THE SECOND FLOOR CROSS
 THIS PARCEL LINE, WHICH CREATE SETBACK AND BUILDING
 SEPARATION ISSUES THAT NEED TO BE ADDRESSED.
 B. THE AGREEMENT FOR PURCHASE AND SALE INDICATES THAT
 PALM BEACH COUNTY WILL RETAIN OWNERSHIP OF THE
 INTERMODAL TRANSIT CENTER TO A POINT 21 FEET IN THE
 AIR. THE APPLICATION DOES NOT MENTION HOW THIS PROPOSED
 SUBDIVISION WILL OCCUR.
 C. THE JUSTIFICATION STATEMENT INDICATES THAT THE
 AGREEMENT FOR PURCHASE AND SALE INCLUDES THE SFRTA, YET
 THEY ARE NOT SHOWN AS A PARTY TO STAFF?S COPY OF THE
 AGREEMENT. WILL THE SFRTA RETAIN ANY OWNERSHIP AND IF
 SO, HOW WILL THE PARCEL BE SUBDIVIDED?
  
 4. TRANSIT VILLAGE BOUNDARY DIAGRAM SHEET A0-03
 DIFFERENT FROM THE ?ITC PROPERTY MAP? AND ?REQUIRED
 MODIFICATIONS FROM ORIGINAL APPROVAL IN OCT. 2011.
 CLEARLY SHOW THE ITC BOUNDARY ON THE GROUND LEVEL AND
 SECOND LEVEL OF THE VARIOUS PLANS.
  
 5. THERE ARE NUMEROUS UTILITY AND OTHER EASEMENTS SHOWN
 ON THE SURVEY. ALL OF THESE EASEMENTS MUST BE SHOWN ON
 THE SITE AND LANDSCAPE PLANS (GROUND LEVEL AND SECOND
 LEVEL) TO SHOW THAT THERE IS NO CONFLICT WITH THE
 PROPOSED DEVELOPMENT.
  
 6. PLEASE DOCUMENT AND IDENTIFY ALL REQUESTED VARIANCES
 AND WAIVERS FOR THE PROPOSED SITE PLANS.
  
 7. PLEASE PROVIDE AN UPDATED SURVEY CLEARLY DOCUMENTING
 THE CHANGES INCORPORATED AS PART OF THE RECENT BANYAN
 BOULEVARD STREETSCAPE PROJECT. ALL PLAN SHEETS MUST
 REFLECT THE ACCURATE BANYAN STREET CONFIGURATION. THIS
 IS CURRENTLY NOT REFLECTED ON ANY OF THE SUBMITTED PLAN
 SHEETS.
 A. PROPOSED RESIDENTIAL ON-STREET DROP OFF ON BANYAN
 FRONTAGE NOT PERMITTED WITHIN TOD-25 DISTRICT.
  
 8. SETBACKS ARE MEASURED FROM THE BACK OF CURB, NOT
 FROM THE PROPERTY LINE.
 A. SETBACK ON BANYAN (GROUND ? 5) IS 16? MIN. AND 50?
 MAX. (AVENUE-CLASSIFICATION) CONDITIONAL SETBACK FOR
 PARKING ABOVE 5TH STORY IS 31? MIN.
 B. SETBACK ON CLEARWATER (GROUND ? 5) IS 12? MIN. AND
 60? MAX. (SECONDARY-CLASSIFICATION) CONDITIONAL SETBACK
 FOR PARKING ABOVE 5TH STORY IS 27? MIN.
 C. ABUTTING CSX IS 15? MIN.
 D. REAR 5? MIN.
 E. SIDE INTERIOR 0? OR NFPA
 F. SETBACKS INTERNAL TO THE PROPERTY BETWEEN COUNTY
 ITC, SFRTA, AND APPLICANT?S PROPERTIES WARRANT FURTHER
 DISCUSSION. AS PREVIOUSLY STATED, THE PROJECT SITE IS
 SPLIT BETWEEN 2 SEPARATE PARCELS, AND POTENTIAL
 VERTICAL SUBDIVISION.
 9. PARKING: THE PARKING TABLE NEEDS TO BE CORRECTED TO
 BETTER CONVEY THE PARKING COUNTS. PLEASE NOTE, WHILE
 NOT MANDATORY, STAFF HAS INCLUDED THE ADDITIONAL
 ALLOWED 25% TOD PARKING SPACE REDUCTION.
 A. OFFICE: MIN. 2.5/1000SF = 457 SPACES (MAX. 4/1000SF
 = 731 SPACES) AFTER 25% TOD REDUCTION, 343 REQUIRED;
 PROVIDING 365 SPACES
 B. HOTEL: MIN. 1/4ROOMS = 27 SPACES, 1/800 SF = 11
 SPACES (MAX. 1/ROOM = 108 SPACES, 1/400 SF = 23
 SPACES); AFTER 25% TOD REDUCTION, 29 REQUIRED;
 PROVIDING 38 SPACES
 C. COMMERCIAL: MIN. 2/1000 SF = 110 SPACES (MAX. 4/1000
 SF = 219 SPACES) AFTER 25% TOD REDUCTION, 83 REQUIRED;
 PROVIDING 110 SPACES
 D. RESIDENTIAL: MIN. 1/UNIT = 821 SPACE, 1/20 GUEST =
 41 GUEST (MAX. 2/UNIT = 1,642 SPACES, 41 GUEST) AFTER
 25% TOD REDUCTION, 661 REQUIRED; PROVIDING 896 SPACES
 TOTAL, NEED A CLEARER BREAKDOWN.
 E. MICRO-UNITS: MIN. 0/UNIT (MAX. 0.5/UNIT = 83 SPACES,
 1/20 GUEST = 8 SPACES); PROVIDING? NEED CLEARER
 BREAKDOWN.
 F. LIVE/WORK UNITS: MIN. 2/1000 SF = 534 SPACES (MAX.
 4/1000SF = 1068 SPACES); AFTER 25% TOD REDUCTION, 400
 REQUIRED; PROVIDING? NEED CLEARER BREAKDOWN. ALSO THERE
 ARE A TOTAL OF 12 LIVE/WORK UNITS FOR 267,000 SF,
 ASSUMING ~22,250 SF EACH? PLEASE EXPLAIN THESE UNITS.
 G. SFRTA AND ITC PARKING: MIN. 290 SPACES (250 FOR
 SFRTA PATRONS AND 40 FOR SFRTA/COUNTY); PROVIDING 275?
 WHY THE SHORTAGE OF 15 SPACES PER THE PSA?
 H. TOTAL MIN REQUIRED: 1,467 SPACES (WITHOUT ANY FOR
 MICRO-UNITS AND NOT INCLUDING 534 FOR LIVE/WORK) 2001
 WITH LIVE/WORK INCLUDED; 2,291 WITH SFRTA/ITC PARKING.
 NOT COUNTING 25% REDUCTION. PROVIDING 2,003 SPACES WITH
 319 UNALLOCATED. EXPLAIN THE UNALLOCATED.
 I. BIKE PARKING: MIN. 1/15 COMMERCIAL/HOTEL/OFFICE = 40
 SPACES REQUIRED, 1/15 RESIDENTIAL = 57 SPACES REQUIRED,
 ALSO NEED TO PROVIDE A SHOWER/CHANGING FACILITY WITHIN
 200 FT. OF BUILDING ENTRANCE. PROVIDING 116 COMMERCIAL,
 100 RESIDENTIAL.
 I. PROVIDE SECURE RESIDENT BICYCLE ROOMS. PROVIDE
 NON-RESIDENTIAL COVERED BICYCLE PARKING AREAS
 DISTRIBUTED THROUGHOUT THE SITE. PROVIDE THE DIMENSIONS
 FOR THE BICYCLE PARKING AREAS ON THE PLANS.
 II. WHERE ARE THE SHOWER/CHANGING FACILITIES LOCATED?
 J. IN THOSE CASES WHERE THE SIDE OF ANY PARKING STALL
 IS ADJACENT TO A WALL, FENCE, BUILDING, OR OTHER
 PHYSICAL OBSTRUCTION, THE STALL WIDTHS SHALL BE
 INCREASED BY A MINIMUM OF ONE FOOT. WHERE THERE IS AN
 OBSTRUCTION ON BOTH SIDES OF THE STALL, THE STALL
 WIDTHS SHALL BE INCREASED BY A MINIMUM OF TWO FEET.
 III. PARKING GARAGE HAS INSTANCES WHERE PARKING SPACES
 APPEAR TO BE NEXT TO WALLS OR STRUCTURE.
 IV. ADA PARKING SPACES ARE LOCATED IN INEFFICIENT AND
 NOT OPTIMAL AREAS. ALL SPACES SHALL HAVE ACCESS TO A
 CURB RAMP OR CURB CUT, WHEN NECESSARY, TO ALLOW
 ENTRANCE TO THE BUILDING SERVED. SPACES SHALL BE
 LOCATED SO THAT USERS ARE NOT COMPELLED TO WALK OR
 OTHERWISE MOVE BEHIND PARKED VEHICLES, EXCLUDING OTHER
 VEHICLES PARKED IN ADJACENT PARKING SPACES FOR THE
 DISABLED.
 V. PLEASE PROVIDE PARKING PAINTED STRIPING DETAILS THAT
 MEET THE CITY STANDARDS OF SEC. 94-485.
 VI. PLEASE PROVIDE ALL PARKING DIMENSIONS FOR DRIVE
 AISLE, PARKING RAMP SLOPE, PARKING STALLS, ETC.
 K. PARKING STRUCTURE RAMP SLOPES: INTERNAL RAMPS APPEAR
 15.8% AND 12.4%. PER SEC. 94-111 (Q.)(2.) IF THE RAMP
 IS GREATER THAN 14 PERCENT, A BREAK-OVER TRANSITION
 SHALL BE REQUIRED.
 L. INTERNAL PARKING STRUCTURE POSES CONCERNS WITH
 INGRESS/EGRESS OF RESIDENTS, EMPLOYEES, VISITORS, AND
 THE OPERATIONS OF LOADING AND BICYCLE USERS. LOADING
 SPACES AND BAYS ARE INEFFICIENT AND CAUSE CONFLICT
 ZONES/SAFETY CONCERNS. POTENTIAL SPILLBACK AND QUEUING
 ISSUES ONTO CLEARWATER.
 M. THE PARKING GARAGE SHOULD BE PREWIRED FOR EV
 CHARGERS BOTH FOR RESIDENTS AND CUSTOMERS. THE
 ELECTRICAL ROOMS NEED TO BE PROVIDED WITH SUFFICIENT
 SPACE TO ACCOMMODATE THE REQUIRED ELECTRICAL PANELS AND
 AREAS NEED TO BE DESIGNATED FOR THE TRANSFORMERS.
  
 10. CURB-CUTS AND PASSENGER LOAD/DROP-OFF: PER SEC.
 94-111 TABLE IV-11 ? TOD DOES NOT PERMIT ON-STREET
 AND/OR PASSENGER DROP-OFF OR LOADING ON AVENUE
 (BANYAN).
  
 11. PLEASE PROVIDE AN FAR AND GBA DIAGRAM SHOWING THE
 BREAKDOWN OF THE PROJECT?S COUNTED/UNCOUNTED ROOMS AND
 SPACES.
 A. GROSS BUILDING AREA MEANS THE TOTAL FLOOR AREA OF A
 BUILDING, INCLUDING AIR-CONDITIONED OR FULLY ENCLOSED
 STORAGE SPACES, ENCLOSED AREAS ON THE ROOFTOP, SUCH AS
 BATHROOMS AND LOBBIES, STAIRS AND ELEVATOR AREAS, AND
 EXTERNAL UNENCLOSED CIRCULATION AREAS. THE GROSS
 BUILDING AREA DOES NOT INCLUDE PARKING AREAS;
 UNENCLOSED COLONNADES, PORCHES AND BALCONIES;
 MECHANICAL AND ELECTRICAL SPACES; AND TRASH ROOMS.
 STORAGE SPACES WITHOUT WINDOWS AND ENCLOSED BY SURFACES
 THAT ALLOW FOR NATURAL VENTILATION OR OUTSIDE AIR
 CIRCULATION SHALL NOT BE INCLUDED.
 VII. GROSS BUILDING AREA REQUIREMENTS:
 1. ANY PORTION OF THE PARKING AREA WHICH EXCEEDS THE
 MAXIMUM PARKING RATIO SHALL BE INCLUDED IN THE
 CALCULATIONS OF GROSS BUILDING AREA. THIS SHALL INCLUDE
 STALLS AND ALL ASSOCIATED CIRCULATION AREAS.
 2. PARKING LOCATED BELOW GRADE SHALL NOT BE COUNTED AS
 PART OF THE GROSS BUILDING AREA.
 3. THE GROSS BUILDING AREA SHALL BE MEASURED FROM THE
 OUTSIDE FACE OF EXTERIOR WALLS.
  
 12. PLEASE PROVIDE ACTIVE USE DIAGRAM AND CALCULATIONS
 FOR SITE FRONTAGES.
  
 13. IT APPEARS THAT THE ELEVATION DRAWINGS DO NOT MATCH
 THE GROUND LEVEL SITE PLAN. THE ELEVATION DRAWINGS MUST
 INCLUDE HORIZONTAL DIMENSIONS FOR THE VARIOUS FEATURES
 SO THAT STAFF CAN VERIFY THAT THE ELEVATIONS MATCH THE
 SITE PLAN BUT ALSO THAT THE SITE FRONTAGES COMPLY WITH
 THE VARIOUS ZONING REQUIREMENTS.
  
 14. PLEASE SPECIFY THE TYPE OF OPEN SPACES (PRIVATE &
 PUBLIC) PROVIDED ON THE DRAWINGS, REFERENCE SEC. 94-109
 AND TABLE IV-7. CLARIFY HOW THE REQUIREMENTS OF EACH
 OPEN SPACE TYPE IS MET WITHIN THE LANDSCAPE DRAWINGS.
 A. PROPOSED OPEN SPACE AT THE SOUTHERN TRIANGLE OF THE
 SITE DOES NOT MEET PUBLIC OR PRIVATE OPEN SPACE
 TYPOLOGY DUE TO LACK OF ABUTMENT TO AN ACTIVE USE.
 B. THE PUBLIC OPEN SPACE SHOWN ON THE SECOND LEVEL
 REQUIRES THE APPROVAL OF A VARIANCE, SIMILAR TO THE ONE
 APPROVED AS PART OF THE CURRENTLY APPROVED SITE PLAN.
  
 15. STREET TREES: STREET TREES SHALL BE PLANTED AT 30
 FT. INTERVALS ALONG EACH STREET FRONTAGE. CLEARWATER
 FRONTAGE SHOULD HAVE APPROX. 46 TREES AND BANYAN
 FRONTAGE APPROX. 13.
  
 16. PROPOSED RESIDENTIAL DROP-OFF AND LOOP FOR
 RESIDENTIAL TOWER ON CLEARWATER IS OUTSIDE OF PROPERTY
 LINES AND ENCROACHES INTO CITY ROW. ADDITIONAL SMALLER
 DROP-OFF ADJACENT TO LOADING BAY/BACK-OF-HOUSE. WHY ARE
 THESE DROP-OFF SPACES NEEDED FOR THE RESIDENTIAL TOWER?
 ADJACENT HOTEL/OFFICE ALSO INCLUDES A SMALL DROP-OFF,
 PRESENTS STACKING/QUEUING ISSUES AND SPILL OVER INTO
 CLEARWATER. STAFF DOES NOT SUPPORT THE RESIDENTIAL
 DROP-OFF ROAD ADJACENT TO RESIDENTIAL TOWER/CLEARWATER
 PROPOSED RESIDENTIAL DROP-OFF NOT IN COMPLIANCE.
 ENCROACHES INTO THE PUBLIC RIGHT-OF-WAY AND PER SEC.
 94-111 (N.)(3.) DESIGNATED PASSENGER LOADING AND
 DROP-OFF AREAS SHALL BE SET BACK A MINIMUM OF 16 FEET
 FROM THE BACK OF CURB, SHALL BE SEPARATED FROM THE
 SIDEWALK BY A 5-FOOT-WIDE LANDSCAPE BUFFER AND SHALL BE
 SUBJECT TO APPROVAL BY THE CITY TRAFFIC ENGINEER. PORTE
 COCHERES ARE SUBJECT TO MINIMUM STANDARDS DEPENDING ON
 SUBDISTRICT LOCATION AND ADJACENCY TO A STREET
 DESIGNATION AND ARE SEPARATED INTO TWO TYPES WHICH ARE
 ILLUSTRATED IN FIGURE IV-22. ONLY A TYPE A PORTE
 COCHERE IS ALLOWED IN THE TOD-25 SUBDISTRICT.
 A. INSTEAD, THE BUILDING FRONT SHOULD BE MOVED CLOSER
 TO CLEARWATER, AND RECONFIGURE LOADING AND
 BACK-OF-HOUSE TO INCLUDE THE DRIVEWAY AND DROP OFF
 AREA.
 B. SEE ABOVE: PROPOSED LOADING SPACE ON RESIDENTIAL
 TOWER DOES NOT FUNCTION FOR VEHICULAR MOVEMENT.
  
 17. ITC BUS LOOP IS NOW ENTIRELY COVERED OVERHEAD BY
 PLAZA AND BUILDINGS/STRUCTURES. PREVIOUS DESIGN HAD AN
 OPEN-AIR CORRIDOR TO PROVIDE LIGHT, LANDSCAPING, AND
 VENTILATION/OPEN-AIR ACCESS. HOW WILL THE REMOVAL OF
 THESE ELEMENTS BE MITIGATED OR COMPENSATED FOR,
 ESPECIALLY WHERE ANY MECHANICAL VENTING WILL BE
 LOCATED?
  
 18. PLEASE PROVIDE SHEETS AND DRAWINGS IDENTIFYING HOW
 THE FA?ADE ARTICULATION REQUIREMENTS ARE MET FOR THE
 PROJECT. PLEASE REFERENCE SEC. 94-109 AND TABLE IV-4:
 FA?ADE ARCHITECTURAL REQUIREMENTS.
 A. ILLUSTRATE TRANSPARENCY CALCULATIONS, FENESTRATION
 CALCULATIONS, PLANAR BREAK CALCULATIONS, PROJECTIONS,
 ETC. FOR ALL BUILDING FACADES.
  
 19. PLEASE PROVIDE DETAILS AND MATERIALS OF THE GARAGE
 STRUCTURE, HOW IS IT BEING SCREENED, MATERIALS, PLANTS,
 ETC.
  
 20. REGARDING THE ARCHITECTURAL DESIGN OF THE TOWERS,
 HAS VARIED FACADES AND ELEMENTS BEEN EXPLORED OR IS
 THERE A REASON FOR UNVARIED/SIMILARLY DESIGNED TOWERS?
  
 21. REGARDING THE TOWERS AND OVERALL PROJECT HEIGHT,
 STAFF REQUESTS THAT THE BANYAN RESIDENTIAL TOWER IS THE
 TALLEST RATHER THAN THE CLEARWATER HOTEL/OFFICE TOWER.
 THIS IS BECAUSE BANYAN IS THE WIDEST ROADWAY AND IS
 MORE APPROPRIATELY FRAMED/CAN ACCOMMODATE THE TALLER
 MASS. ADDITIONALLY, STAFF RECOMMENDS THAT THE BANYAN
 RESIDENTIAL TOWER STEPS DOWN IN SOME CAPACITY TOWARD
 TAMARIND AVE. AS WAS APPROVED WITHIN THE ORIGINAL SITE
 PLAN. THIS GIVES RESPECT TO THE SCALE OF THE SEABOARD
 TRAIN STATION AND PUBLIC REALM ALONG TAMARIND.
  
 22. BE COGNIZANT THAT THE EDGE 2 BUILDING LOCATED AT
 300 CLEARWATER IS APPROVED AND UNDERGOING BUILDING
 PERMITTING PROCESS, THIS PROJECT?S INGRESS/EGRESS FROM
 DRIVES MAY PRESENT CONFLICT POINTS. THE GROUND LEVEL
 PLANS NEED TO SHOW THE EDGE 2 CURB CUTS IN ORDER FOR
 STAFF TO EVALUATE THE IMPACT OF THE ACCESS POINTS TO
 CLEARWATER. ADDITIONALLY, THE PEDESTRIAN CONNECTION
 FROM THE ?OASIS? PARK ELEMENT ACROSS CLEARWATER TO THE
 STAIRWELL/ELEVATOR FOR THE UPPER PLAZA WILL NEED
 RECONSIDERATION WITH THE INCOMING DEVELOPMENT.
  
 23. PLEASE CLARIFY GROUND FLOOR PEDESTRIAN CIRCULATION
 WITH ITC, ACCESSING UPPER PLAZA SPACES, AND INTERNAL
 CIRCULATION BETWEEN RETAIL AND RESIDENTIAL TOWERS. IS
 THE ITC BUS LOOP SEPARATED/CLOSED OFF IN THE EVENINGS
 WHEN BUS OPERATIONS HALT, HOW IS WAYFINDING ADDRESSED
 TO ACCESS THE UPPER PLAZA SPACES?
 A. THE ITC ADA PATH DRAWING SUBMITTED WITH THE
 APPLICATION SHOWS THE ADA ROUTE UTILIZING A CROSSWALK
 THAT IS DESIGNATED FOR REMOVAL.
 B. THE ITC FENCE EXHIBIT SHOWS THE FENCE AROUND THE
 OPEN SPACE AT THE SOUTH END OF THE SITE AS A ?PRIVATE
 PARK FENCE?. THIS DOES NOT MATCH THIS AS BEING DEPICTED
 AS PUBLIC OPEN SPACE ON OTHER PLANS.
  
 24. STAFF WILL BE RECOMMENDING PEDESTRIAN IMPROVEMENTS
 AND INCREASED ACCESSIBILITY TO TAMARIND AND THE
 DOWNTOWN AREA. AS A TOD PROJECT, YOU MUST DEMONSTRATE
 HOW THE RELATION AND CONNECTIVITY IS IMPROVED TO THESE
 CORRIDORS INTO THE DOWNTOWN. RECOMMEND POTENTIAL: WORK
 WITH SFRTA TO IMPLEMENT AT-GRADE CONNECTION(S) ACROSS
 RAILS TO TAMARIND. IMPROVE THE PEDESTRIAN BRIDGE
 CONNECTING SEABOARD TRAIN STATION AND TRANSIT VILLAGE
 PROJECT. EXPLORE CONCEPT OF ADDITIONAL PEDESTRIAN
 BRIDGES OR CONNECTIONS.
  
 25. PLEASE PROVIDE INFORMATION ON WHAT THE ?MOTOR
 LOBBY? IS.
  
 26. THE SOUTH RESIDENTIAL BUILDING IS NOT PERMITTED TO
 ENCROACH THE 20-FOOT FIRE DEPARTMENT ACCESS EASEMENT.
 NOTE: EVEN WITHOUT THE BUILDING ENCROACHMENT, THIS DOES
 NOT FUNCTION.
  
 27. PROVIDE TURNING DIAGRAMS FOR THE LOADING AREAS
 UNDER THE NORTH BUILDING, ENTRY POINTS TO THE SITE AND
 THE OTHER LOADING AREAS.
  
 28. WHERE ARE THE GENERATORS, TRANSFORMERS, AND OTHER
 MECHANICAL EQUIPMENT AND HOW ARE THEY SCREENED IN
 ACCORDANCE WITH CITY CODE REQUIREMENTS?
  
 29. PLEASE CONSIDER USING SUSTAINABLE INFRASTRUCTURE
 SUCH AS ROOFTOP SOLAR OR RAINWATER CAPTURE/REUSE
 CISTERNS.
  
 30. SHEET A6-01 SHOWS PUBLIC OPEN SPACES EXTENDING INTO
 THE BUS LANE.
  
 31. FOR THE EVENTUAL DOWNTOWN ACTION COMMITTEE (DAC)
 MEETING, PLEASE PROVIDE FULLY DETAILED RENDERINGS AND
 PERSPECTIVE DRAWINGS OF THE FINAL PROJECT.
 32. PROVIDE A PRELIMINARY CONSTRUCTION PLAN TO SHOW HOW
 THE SITE WILL BE DEVELOPED WHILE MAINTAINING ITC
 OPERATIONS, TO INCLUDE PARKING. ADDITIONALLY, PROVIDE
 THE PRELIMINARY PLAN FOR EMPLOYEE AND CONTRACTOR
 PARKING DURING CONSTRUCTION.
  
 33. THERE ARE COLUMN LOCATIONS THAT WHEN COMBINED WITH
 THE LOCATION OF THE PROPOSED ITC FENCE CREATE CHOKE
 POINTS FOR THE BUS PATRONS AS THEY CHANGE BETWEEN
 ROUTES. WHILE THEY ALL APPEAR TO COMPLY WITH ADA
 MINIMUMS, THEY DO NOT PROVIDE COMFORTABLE PEDESTRIAN
 WIDTHS FOR TWO USERS TO PASS SIDE-BY-SIDE. PLEASE
 REVIEW.
  
 34. THE SITE, LANDSCAPE AND CIVIL PLANS ALL NEED TO
 SHOW CONSISTENT, CODE COMPLIANT CONDITIONS.
  
 35. PROVIDE VERIFICATION THAT THE PROJECT MEETS THE
 STREETSCAPE REQUIREMENTS OF SECTION 94-113. THIS
 INCLUDES LIGHTING, SIDEWALK WIDTH, LANDSCAPE, BICYCLE
 PARKING, STREET FURNITURE, ETC.
  
 36. PROVIDE COMPLIANCE WITH SEC. 94-106 ? GENERAL USES
 WITH SPECIAL REQUIREMENTS (8.A) MICRO-UNITS (A.-F.)
 A. MICRO-UNIT MEANS A SMALL RESIDENTIAL UNIT WITH A
 TOTAL SQUARE FOOTAGE BETWEEN 300 SQUARE FEET AND 549
 SQUARE FEET, WITH A FULLY FUNCTIONING KITCHEN AND
 BATHROOM.
 B. SEC. 94-109 ?DWELLING UNIT REQUIREMENTS
 VIII. DWELLING UNITS SHALL NOT BE LESS THAN 550 SQUARE
 FEET. IN MULTIPLE DWELLING UNIT BUILDINGS, THE
 CUMULATIVE AVERAGE OF ALL DWELLING UNITS SHALL NOT BE
 LESS THAN 800 SQUARE FEET.
 IX. SMALLER DWELLING UNITS MAY BE ALLOWED AS
 MICRO-UNITS. THE CUMULATIVE AVERAGE SIZE MINIMUM SHALL
 NOT BE APPLICABLE TO MULTIPLE DWELLING UNIT BUILDINGS
 WHERE MICRO-UNITS COMPOSE A MINIMUM OF 80 PERCENT OF
 THE TOTAL NUMBER OF UNITS. IN ALL OTHER CASES, THE
 CUMULATIVE AVERAGE SIZE OF ALL DWELLING UNITS SHALL NOT
 INCLUDE THE MICRO-UNITS IN SUCH CALCULATION. SEE
 MICRO-UNITS.
  

  Print