Plan Review Details - Project Z22020029
Plan Review Stops For Project Z22020029
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 03-09-2022 Cont ID  
Sent By mtechnow Date 03-03-2022 Time 12:57 Rev Time 0.00
Received By rrossano Date 03-09-2022 Time 20:34 Sent To  
Notes
2022-03-09 20:38:43DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR THE BUILDING PERMIT APPLICATION.
  
 2. FLOOD ZONE. ACCORDING TO THE ADOPTED FLOOD INSURANCE
 RATE MAPS (FIRMS), THE PROPOSED SITE IS IN FLOOD ZONE
 AE, WITH A BASE FLOOD ELEVATION OF6 FT NAVD AND, SHOULD
 THE CITY'S PENDING APPEAL TO FEMA NOT BE SUCCESSFUL,
 THE BASE FLOOD ELEVATION WILL INCREASE TO 9 FT NAVD.
 ALL MECHANICAL AND ELECTRICAL EQUIPMENT SHALL BE 24
 INCHES (FREEBOARD) ABOVE THE BASE FLOOD ELEVATION.
  
 3. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SIGNS, GAS SYSTEMS, GENERATORS, FIRE ALARM SYSTEMS,
 FIRE SPRINKLER AND OTHER FIRE SUPPRESSION SYSTEMS,
 GREASE INTERCEPTORS, SITE LIGHTING, SITE LANDSCAPE,
 SITE IRRIGATION, ETC.
  
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 2 Status P Date 04-13-2022 Cont ID  
Sent By rrossano Date 04-13-2022 Time   Rev Time 0.00
Received By rrossano Date 04-13-2022 Time   Sent To  
Notes
***NONE***

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status F Date 03-04-2022 Cont ID  
Sent By ldeloren Date 03-04-2022 Time   Rev Time  
Received By ldeloren Date 03-04-2022 Time   Sent To  
Notes
2022-03-04 08:08:50RICK ROSSANO , SENIOR PROJECT COORDINATOR, (561)
 494-1098, [email protected]
 O NO COMMENT
  
 MARK HURLEY, FIELD CUSTOMER SERVICE SUPERVISOR,
 561-822-2262, [email protected]
 -WILL THE WATER AND SEWER DEMAND INCREASE DUE TO THE
 PROJECT? IF SO, VERIFY EXISTING WATER AND SEWER
 INFRASTRUCTURE IS SUFFICIENT.
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 02-28-2022 Cont ID  
Sent By pleduc Date 02-28-2022 Time   Rev Time 0.00
Received By pleduc Date 02-28-2022 Time 14:04 Sent To  
Notes
2022-02-28 16:02:43FIRE HAS NO OBJECTIONS TO THE PROPOSED AND APPROVES.
  
 FIRE'S APPROVAL OF THIS SUBMITTED PROJECT MAY NOT
 CONSTITUTE IT'S FINAL REVIEW OR APPROVAL.
  
 FIRE SHALL REVIEW ANY SUBMITTED PLANS AT THE
 APPROPRIATE TIME AND IN ACCORDANCE WITH THE
 REQUIREMENTS OF ALL APPLICABLE FIRE CODES AND
 STANDARDS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop L LANDSCAPING
Rev No 1 Status P Date 03-07-2022 Cont ID  
Sent By rcaranci Date 03-07-2022 Time 12:52 Rev Time 0.00
Received By rcaranci Date 03-07-2022 Time 12:52 Sent To  
Notes
***NONE***

Review Stop PU PUBLIC UTILITIES
Rev No 1 Status P Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By mtechnow Date 03-03-2022 Time 12:55 Sent To  
Notes
2022-03-03 12:56:45ALL PROPOSED WORK IS OUTSIDE OF CITY ROW. NO IMPACT ON
 UTILITIES, NO FURTHER COMMENTS.
  
  

Review Stop PW PUBLIC WORKS
Rev No 1 Status P Date 03-16-2022 Cont ID  
Sent By eschneid Date 03-16-2022 Time 08:44 Rev Time  
Received By eschneid Date   Time   Sent To  
Notes
2022-03-07 11:14:33PUBLIC WORKS HAS NO OBJECTIONS FOR THE PROPOSED MINOR
 SITE PLAN CHANGES.
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045

Review Stop STORM STORMWATER
Rev No 1 Status P Date 03-09-2022 Cont ID  
Sent By tward Date 03-09-2022 Time 17:47 Rev Time 0.00
Received By tward Date 03-09-2022 Time 17:47 Sent To  
Notes
2022-03-09 17:47:47THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
  
 1. PROVIDE AN EROSION CONTROL PLAN WITH DETAILS.
 2. PROVIDE CALCULATIONS DEMONSTRATING ADEQUATE
 TREATMENT IS AVAILABLE FOR THE ADDITIONAL IMPERVIOUS
 AREA AND NO NET INCREASE IN OFFSET DISCHARGE DUE TO THE
 DECREASE IN THE DETENTION AREA.
  
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  

Review Stop SURVEY SURVEYING
Rev No 1 Status P Date 03-09-2022 Cont ID  
Sent By vnoel Date 03-09-2022 Time 10:02 Rev Time  
Received By vnoel Date   Time   Sent To  
Notes
2022-03-09 10:02:311. WILL THE PUMP PAD FOR THE TANKS BE A WELL OR JUST
 FOR INTERNAL TANK CIRCULATION?

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 2 Status P Date 03-16-2022 Cont ID  
Sent By   Date 03-16-2022 Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
2022-03-16 10:28:05PASSED WITH THE FOLLOWING CONDITIONS:
 A) INDICATE RAMP SLOPE IN THE PLAN SHEETS
 B) INSERT ADA STANDARD REFERENCES IN THE PLAN SHEETS
  
 PREVIOUS COMMENTS:
 1) SATISFIED. PLEASE PROVIDE STRUCTURAL PLANS
 SHOWCASING RAMP DETAILS
 2) SATISFIED. PLEASE INSTALL HANDRAILS ALONG THE RAMP,
 IN CASE REQUIRED FOR ADA COMPLIANCE
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status F Date 03-09-2022 Cont ID  
Sent By   Date 03-09-2022 Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
2022-03-09 15:37:071) PLEASE PROVIDE THE STRUCTURAL PLANS SHOWCASING RAMP
 DETAILS
 2) PLEASE INSTALL HANDRAILS ALONG THE RAMP, IN CASE
 REQUIRED FOR ADA COMPLIANCE
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop Z ZONING
Rev No 2 Status P Date 03-16-2022 Cont ID  
Sent By eschneid Date 03-16-2022 Time 09:16 Rev Time 0.00
Received By eschneid Date 03-16-2022 Time 09:08 Sent To  
Notes
2022-03-16 09:33:20CASE NO. ISPR 14-06E
 MANATEE ED. CENTER PARK - SEA GRASS DEMONSTRATION &
 WATER ACCESS RAMP
 ADDRESS: 5904 N. FLAGLER DR.
  
 CONDITIONS:
  
 1) THE WATER CIRCULATION SYSTEM PIPES TO SUPPLY/DRAIN
 WATER FROM THE PUMP MUST BE SHOWN ON THE LANDSCAPE PLAN
 AT TIME OF PERMITTING FOR THE SEA GRASS DEMONSTRATION
 AREA. IT MUST CLEARLY DEMONSTRATED THAT THE LOCATION OF
 THE PIPES AND THE INSTALLATION OF THE PIPES WILL NOT
 DAMAGE OR CONFLICT WITH EXISTING TREES OR LANDSCAPING.
  
 2) NO WATERCRAFT MAY BE PERMANENTLY STORED OR DOCKED AT
 THE WATER ACCESS RAMP.
  

Review Stop Z ZONING
Rev No 1 Status F Date 03-09-2022 Cont ID  
Sent By eschneid Date 03-09-2022 Time 10:14 Rev Time 0.75
Received By eschneid Date 03-09-2022 Time 08:42 Sent To  
Notes
2022-03-09 10:15:22CASE NO. ISPR 14-06E
 MANATEE ED. CENTER PARK - SEA GRASS DEMONSTRATION &
 WATER ACCESS RAMP
 ADDRESS: 5904 N. FLAGLER DR.
  
 - CONTACT ERIC SCHNEIDER @ (561) 822-1446,
 [email protected]
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF TWO
 (2) PAPER COPIES AND AN ELECTRONIC COPY IN .PDF FORMAT
 OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS
 TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL
 COMMENTS.
  
 - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT
 RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS
 FROM THE DATE OF THE PPRC MEETING (BY MAY 10, 2022),
 THE PLANNING DIVISION MAY NOTIFY THE APPLICANT THAT THE
 CASE IS CONSIDERED WITHDRAWN. ANY FURTHER ACTION SHALL
 REQUIRE A NEW DEVELOPMENT APPLICATION.
  
 - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($60).
  
 1) THE SITE PLAN SHOWS A PUMP PAD ADJACENT TO THE SEA
 GRASS DEMONSTRATION AREA. PLEASE PROVIDE INFORMATION ON
 THE WATER CIRCULATION SYSTEM, SPECIFICALLY IF PIPES ARE
 PLANNED TO BE INSTALLED TO SUPPLY/DRAIN WATER FROM THE
 PUMP. IF UNDERGROUND PIPES ARE TO BE INSTALLED ACROSS
 THE SITE, THEY WILL NEED TO BE SHOWN ON THE LANDSCAPE
 PLAN SO STAFF CAN VERIFY THAT THEY DO NOT CONFLICT WITH
 EXISTING TREES.
  
 2) THE ENGINEERING PLAN REFERENCES STRUCTURAL PLANS
 THAT SHOW THE RAMP DETAILS. PLEASE PROVIDE THESE
 STRUCTURAL PLANS SO THAT STAFF CAN HAVE A COY OF THE
 RAMP CROSS SECTION.
  
 CONDITION: NO WATERCRAFT MAY BE PERMANENTLY STORED OR
 DOCKED AT THE WATER ACCESS RAMP.
  