Plan Review Details - Project Z22020023
Plan Review Stops For Project Z22020023
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 03-09-2022 Cont ID  
Sent By rbrown Date 03-09-2022 Time 20:26 Rev Time 0.00
Received By rbrown Date 03-09-2022 Time 20:26 Sent To  
Notes
2022-03-09 20:28:00DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR THE BUILDING PERMIT APPLICATION.
  
 2. ELECTRIC VEHICLE CHARGING STATION. IF ELECTRIC
 VEHICLE (EV) CHARGING STATIONS ARE PROVIDED AT LEAST 1
 IN 25 MUST COMPLY WITH ACCESSIBLE PARKING SPACE
 REQUIREMENTS.
  
 3. GREASE INTERCEPTOR. A GREASE INTERCEPTOR WILL BE
 REQUIRED. FOR INFORMATION ON THE REQUIRED TYPE, SIZE
 AND LOCATION, PLEASE CONTACT RYAN BROWN, CHIEF PLUMBING
 INSPECTOR, DEVELOPMENT SERVICES DEPARTMENT, AT (561)
 805-6692, OR BY EMAIL: [email protected]
  
 4. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS,
 GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND
 OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS,
 SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC.
  
 5. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND
 CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF
 CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL
 NEIGHBORING PROPERTIES.
  
 6. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER
 AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY,
 INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE
 CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF
 NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION
 THAT MAY AFFECT THE USE OF THEIR PROPERTY.
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 2 Status P Date 06-07-2022 Cont ID  
Sent By rrossano Date 06-07-2022 Time   Rev Time 0.00
Received By rrossano Date 06-07-2022 Time   Sent To  
Notes
***NONE***

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status F Date 03-04-2022 Cont ID  
Sent By ldeloren Date 03-04-2022 Time   Rev Time  
Received By ldeloren Date 03-04-2022 Time   Sent To  
Notes
2022-03-04 08:11:19Z22020023 ? 695 S OLIVE HOTEL ? 2-23-22 REVIEW
  
 MARK HURLEY, FIELD CUSTOMER SERVICE SUPERVISOR WITH
 CITY OF WPB PUBLIC UTILITIES, REGARDING PLACEMENT OF
 BACKFLOW DEVICES AND WATER METERS. CONTACT HIM AT
 561-822-2262 OR [email protected]
  
 -WHY IS APPLICANT SEEKING CHANGE OF USE FROM
 RESIDENTIAL MICRO UNITS TO HOTEL?
  
 -CALLOUT ON SHEET A1-01 DOUBLE DETECTION CHECK VALVE
 AND WATER METER UNDER GROUND - SEE CIVIL DWGS NEEDS TO
 BE UPDATED AS DDCV CANNOT BE UNDER GROUND.
  
 -PLANTING PLAN LP 1.01 DOES NOT MATCH FIELD CONDITIONS
 AS OF 25FEB2022 WITH REGARD TO BUSHES AND LANDSCAPING
 AROUND WATER METER VAULT. IS PLAN CORRECT AND CHANGE
 INTENDED?
  
 -UTILITY PLAN DOES NOT SHOW GREASE INTERCEPTOR FOR ONE
 OF THE PROPOSED RESTAURANT/RETAIL SPACES. APPLICANT
 NEEDS TO COMPLY WITH ANY GREASE INTERCEPTOR
 REQUIREMENTS IF RESTAURANT IS ESTABLISHED THERE.
  
 -WOULD HOTEL PORTION HAVE ANY FOOD SERVICE REQUIRING
 INSTALLATION OF GREASE INTERCEPTOR?
  
 -VERIFY PEDESTRIAN AND UTILITY EASEMENTS ARE RECORDED
 AS SHOWN ON UTILITY PLAN.
  
 -VERIFY IF THE WATER AND SEWER UTILITIES SHOWN ON
 UTILITY PLAN HAVE ALREADY BEEN BUILT, AND INDICATE IF
 ANY CHANGES ARE PROPOSED TO UTILITIES FROM MICROUNITS
 PLAN TO HOTEL PLAN.
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 02-28-2022 Cont ID  
Sent By pleduc Date 02-28-2022 Time   Rev Time 0.00
Received By pleduc Date 02-28-2022 Time 15:17 Sent To  
Notes
2022-02-28 15:39:06FIRE HAS NO OBJECTIONS TO THE PROPOSED AND APPROVES IN
 CONCEPT.
  
 HOWEVER, FIRE'S APPROVAL OF THIS SUBMITTED PROJECT MAY
 NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL.
  
 FIRE SHALL REVIEW ALL SUBMITTED CHANGE OF OCCUPANCY
 BUILDING PLANS AT THE APPLICABLE TIME AND IN ACCORDANCE
 WITH THE REQUIREMENTS OF ALL APPLICABLE FIRE CODES AND
 STANDARDS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop L LANDSCAPING
Rev No 2 Status P Date 06-07-2022 Cont ID  
Sent By rcaranci Date 06-07-2022 Time 09:06 Rev Time 0.00
Received By rcaranci Date 06-07-2022 Time 09:06 Sent To  
Notes
2022-06-07 09:06:30FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: 695 S OLIVE DMP MINOR FSPR 22-03 LEVEL II
 Z22020023
 JUNE 7, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 1. SATISFIED. THE LANDSCAPE PLANS FOR THE AS BUILT
 CONDITION MAY BE SUBMITTED WITH THIS PETITION FOR
 APPROVAL WITH THE SITE PLAN AMENDMENT. THE AS BUILT
 PLANS WILL BE SUBMITTED AS A PERMIT REVISION AND WILL
 ALSO BE USED FOR THE STREETSCAPE MAINTENANCE AGREEMENT.
  
  

Review Stop L LANDSCAPING
Rev No 1 Status F Date 03-07-2022 Cont ID  
Sent By rcaranci Date 03-07-2022 Time 12:09 Rev Time 0.00
Received By rcaranci Date 03-07-2022 Time 12:09 Sent To  
Notes
***NONE***

Review Stop PARK PARKING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop POLICE POLICE
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PU PUBLIC UTILITIES
Rev No 2 Status P Date 06-08-2022 Cont ID  
Sent By mtechnow Date 06-08-2022 Time 14:10 Rev Time 0.00
Received By mtechnow Date 06-08-2022 Time 14:10 Sent To  
Notes
***NONE***

Review Stop PU PUBLIC UTILITIES
Rev No 1 Status F Date 06-08-2022 Cont ID  
Sent By mtechnow Date 06-08-2022 Time 14:09 Rev Time 0.00
Received By mtechnow Date 03-09-2022 Time 14:15 Sent To  
Notes
2022-03-09 14:14:51-WILL NEED AN 8" CLEANOUT
 -ADDITIONAL IMPROVEMENTS MAY BE REQUIRED UPON FURTHER
 EVALUATION.
 -CONFLICTING INFO WITH SIZE/MATERIAL OF SANITARY SEWER
 ON TRINITY PL. PLEASE VERIFY.
 -ARE THERE DRY UTILITIES IN THE RIGHT OF WAY?
 -NOTE ALL WATER LINES CONNECTED TO THE DISTRIBUTION
 SYSTEM MUST PASS BACTERIAL TESTING.
 -WHERE IS THE POINT OF SERVICE?
 -CALL OUT SIZE/MATERIAL.
 -SEE LIST OF STANDARD COMMENTS.
  
 CONTACT MIKE TECHNOW 561-494-1047 OR [email protected]
 WITH ANY QUESTIONS.

Review Stop PW PUBLIC WORKS
Rev No 2 Status P Date 06-01-2022 Cont ID  
Sent By   Date 06-01-2022 Time   Rev Time 0.00
Received By   Date 06-01-2022 Time   Sent To  
Notes
2022-06-01 11:08:25NO FURTHER COMMENTS.
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]

Review Stop PW PUBLIC WORKS
Rev No 1 Status F Date 03-07-2022 Cont ID  
Sent By   Date 03-07-2022 Time   Rev Time  
Received By   Date 03-07-2022 Time   Sent To  
Notes
2022-03-07 10:19:27PLEASE PROVIDE THE FOLLOWINGS:
 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID
 WASTE VOLUME PRODUCED ALONG WITH THE SIZE, TYPE AND
 QUANTITY OF THE CONTAINER (I.E. DUMPSTER/COMPACTOR)
 THAT WILL BE UTILIZED THAT WILL BE UTILIZED FOR THE
 SANITATION SERVICE.
 2- AUTOTURN EXHIBIT (DYNAMIC ENVELOPE AND THE VEHICLE'S
 WHEEL PATH) FOR THE SANITATION SERVICE, FRONT LOADER
 TRUCK WITH THE FOLLOWING SPECS:
 - DUAL AXLES
 - TRUCK LENGTH: 35 FT
 - TRUCK WIDTH: 11 FT
 - TURNING RADIUS:
 - SAE TURNING RADIUS: 32.5 FT
 - CURB-TO-CURB DIAMETER: 74 FT
 - WALL-TO-WALL DIAMETER: 86.3 FT
 3- CONTINGENCY PLAN, FOR WHEN THE COMPACTOR IS OUT OF
 SERVICE (I.E. CITY DUMPSTER, ROLL-OFF CONTAINER)
 4- DESIGNATED LOCATION FOR THE BULK ITEM PICK UP AND
 RECYCLING CONTAINERS
 5- OWNERS AND/OR OCCUPANTS OF PROPERTY THAT REQUIRE
 GREASE HAULING SERVICES SHALL ENSURE THAT THEIR GREASE
 TANKS OR CONTAINERS REMAIN CLEAN, AND ARE ENCLOSED AND
 NOT IN PUBLIC VIEW.
 6- IN CASE OF PROPOSING ADDITION OF ANY NEW CAN(S) IN
 THE CITY`S RIGHT-OF-WAY , THE LOCATION AND QUANTITY OF
 THE CAN(S) SHALL BE REVIEWED AND APPROVED BY PUBLIC
 WORKS DEPARTMENT AND THE CAN(S) SHALL BE TYPE, SIZE AND
 COLOR APPROVED BY PUBLIC WORKS DEPARTMENT. THE BUILDING
 MAINTENANCE IS RESPONSIBLE TO MAINTAIN AND SERVICE THE
 CAN(S).
  
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045

Review Stop STORM STORMWATER
Rev No 1 Status P Date 03-09-2022 Cont ID  
Sent By tward Date 03-09-2022 Time 09:34 Rev Time 0.00
Received By tward Date 03-09-2022 Time 09:34 Sent To  
Notes
***NONE***

Review Stop SURVEY SURVEYING
Rev No 1 Status P Date 03-09-2022 Cont ID  
Sent By vnoel Date 03-09-2022 Time 09:51 Rev Time  
Received By vnoel Date   Time   Sent To  
Notes
***NONE***

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 2 Status P Date 06-22-2022 Cont ID  
Sent By   Date 06-22-2022 Time   Rev Time 0.00
Received By   Date 06-22-2022 Time   Sent To  
Notes
2022-06-22 14:10:071) SATISFIED. PLEASE PROVIDE A NARRATIVE AND SITE PLAN
 DETAILS OF HOW ARRIVAL, CHECK-IN AND PARKING ARE
 HANDLED FOR HOTEL GUEST DRIVING A VEHICLE AND NO VALET
 SERVICES OFFERED
  
 RESPONSE: THE TRAFFIC IMPACT ANALYSIS (TIA) HAS BEEN
 UPDATED WITH THE NARRATIVE CLARIFICATION
 REQUESTED. AS DISCUSSED IN THE PPRC MEETING, THERE ARE
 NO VALET OPERATIONS PROPOSED. THERE
 ARE 7 SPACES ON THE FIRST FLOOR THAT ARE RESERVED FOR
 SHORT-TERM PARKING TO BE USED SOLELY FOR
 HOTEL GUEST CHECK IN/CHECK OUT AS WELL AS SHORT PICK UP
 AND DROP OFF (RIDE SHARE, FOOD DELIVERY,
 SHORT RETAIL VISITS, ETC). THE TIA ALSO HAS COMPLETED
 AN EVALUATION OF THE NEED FOR A MINIMUM
 NUMBER OF 4 SHORT TERM SPACES FOR THE HOTEL AND
 POTENTIAL GROUND FLOOR RESTAURANT AND RETAIL
 USES, WHICH THE PLAN HAS 7 SPACES PROVIDED AND MARKED
 WITH A POST MOUNTED SIGN (SEE DETAIL
 ON SHEET A1-01), EXCEEDING THE MINIMUM. PLEASE REFER TO
 SHEET A1-01 AND NOTE THE SPACES AS
 THE SHORT-TERM PARKING SPACES NOTED ABOVE.
  
 2) SATISFIED. PLEASE PROVIDE A NARRATIVE AND SITE PLAN
 DETAILS OF THE POTENTIAL INTERNAL VALET OPERATIONS,
 INCLUSIVE OF: LOCATION OF VALET PICK-UP/DROP-OFF
 OPERATIONS, PARKING STALLS ASSIGNED, ROUTES FOR PARKING
 AND RETRIEVING VALET VEHICLES, AND CALCULATIONS OF
 ANTICIPATED VEHICLE QUEUES AT VALET STAND
  
 RESPONSE: AS DISCUSSED IN THE PPRC MEETING, VALET
 OPERATIONS ARE CURRENTLY NOT IN THE PLAN
 AND WOULD REQUIRE BUILDING STRUCTURAL AND FUNCTIONAL
 CHANGES FOR THE COLUMNS AND CIRCULATION.
 AS AGREED, VALET OPERATIONS WILL NOT BE PERMITTED AS
 PART OF THE TDM AGREEMENT AND IF DESIRED
 BY THE OWNER IN THE FUTURE, WILL REQUIRE A FULL
 OPERATIONAL ANALYSIS WITH ALL THOSE COMPONENTS
 NOTED ABOVE AND MORE, AS WELL AS WHATEVER STRUCTURAL OR
 FUNCTIONAL MODIFICATIONS WILL BE
 NECESSARY. THE TDM AGREEMENT HAS LANGUAGE STATING THAT
 VALET OPERATIONS ARE NOT PERMITTED
 UNDER THE CURRENT APPROVAL AND THIS SITE PLAN REQUEST.
  
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status F Date 03-09-2022 Cont ID  
Sent By   Date 03-09-2022 Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
2022-03-09 15:33:451) PLEASE PROVIDE A NARRATIVE AND SITE PLAN DETAILS OF
 HOW ARRIVAL, CHECK-IN AND PARKING ARE HANDLED FOR HOTEL
 GUEST DRIVING A VEHICLE AND NO VALET SERVICES OFFERED
 2) PLEASE PROVIDE A NARRATIVE AND SITE PLAN DETAILS OF
 THE POTENTIAL INTERNAL VALET OPERATIONS, INCLUSIVE OF:
 LOCATION OF VALET PICK-UP/DROP-OFF OPERATIONS, PARKING
 STALLS ASSIGNED, ROUTES FOR PARKING AND RETRIEVING
 VALET VEHICLES, AND CALCULATIONS OF ANTICIPATED VEHICLE
 QUEUES AT VALET STAND
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop Z ZONING
Rev No 2 Status P Date 08-23-2022 Cont ID  
Sent By aaponte Date 08-23-2022 Time 10:46 Rev Time 0.00
Received By aaponte Date 08-23-2022 Time 10:46 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 03-09-2022 Cont ID  
Sent By aaponte Date 03-09-2022 Time 14:00 Rev Time 0.00
Received By aaponte Date 02-08-2022 Time 12:10 Sent To  
Notes
2022-03-09 14:00:421. PLEASE INDICATE THE PARKING SPACES RESERVED FOR
 GUEST CHECK IN OR HOW THE VALET OPERATION WILL FUNCTION
 INSIDE THE PARKING GARAGE. VALET OPERATION WILL NOT BE
 ALLOWED ALONG THE FRONTAGE LINE WITHIN THE CITY'S ROW.
 2. PLEASE IDENTIFY ANY CHANGES ON THE GBA DUE TO THE
 NEW USE. 3RD FLOOR HOUSEKEEPING, CHANGING ROOMS AND
 LAUNDRY SHALL BE COUNTED AS PART OF THE GBA.
 3. STAFF RECOMMENDS MAINTAINING THE LOBBY ENTRANCE FROM
 TRINITY PLACE. IF REMOVED, PLEASE INCLUDE THE
 ADDITIONAL SQUARE FOOTAGE IN THE GBA.
 4.THE PROJECT WILL BE REQUIRED TO ENTER INTO A TDM
 AGREEMENT WITH THE CITY. THE RECOMMENDATION IS TO DRAFT
 THE ONE CURRENLTY UNDERWAY FOR THE RESIDENTIAL WITH A
 HOTEL USE OPTION.
 5. THE RESIDENTIAL PROJECT IS REQUIRED TO ENTER INTO A
 LANDSCAPE/HARDSCAPE MAINTENANCE AGREEMENT WITH THE CITY
 BEFORE FINAL CO. THAT AGREEMENT IS TRANSFERABLE TO THE
 NEW PROPERTY OWNERS.
 FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA
 APONTE AT 561-822-1439
  

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved