Plan Review Details - Project Z21110019
Plan Review Stops For Project Z21110019
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 12-09-2021 Cont ID  
Sent By rbrown Date 12-09-2021 Time 11:31 Rev Time 0.00
Received By rbrown Date 12-09-2021 Time 11:31 Sent To  
Notes
2021-12-09 11:38:04DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR THE BUILDING PERMIT APPLICATION.
  
 2. DEMOLITION OF THE EXISTING BUILDING. AN ASBESTOS
 SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT
 REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH
 COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963,
 OR BY EMAIL: [email protected]
  
 3. FLOOD ZONE. ACCORDING TO THE ADOPTED FLOOD INSURANCE
 RATE MAPS (FIRMS), THE PROPOSED BUILDING IS IN FLOOD
 ZONE AE, WITH A BASE FLOOD ELEVATION OF 14 FT NAVD. THE
 FIRST FLOOR OF THE BUILDING AND ALL ASSOCIATED
 MECHANICAL EQUIPMENT (CHILLERS, GENERATORS ETC.) SHALL
 BE 24 INCHES (FREEBOARD) ABOVE THE BASE FLOOD
 ELEVATION.
  
 4. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT,
 THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR
 THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT,
 AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE
 FLORIDA BUILDING CODE.
  
 5. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SIGNS, GAS SYSTEMS, GENERATORS, FIRE ALARM SYSTEMS,
 FIRE SPRINKLER AND OTHER FIRE SUPPRESSION SYSTEMS,
 GREASE INTERCEPTORS, SITE LIGHTING, SITE LANDSCAPE,
 SITE IRRIGATION, ETC.
  
 6. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT
 WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL
 HAVE A SEPARATE ADDRESS ASSIGNED BASED ON THE LOCATION
 OF THE BUILDING ENTRANCE. FOR STREET ADDRESSING,
 CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT
 (561) 805 6659, OR BY EMAIL: [email protected]
  
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 2 Status P Date 01-13-2022 Cont ID  
Sent By rrossano Date 01-13-2022 Time   Rev Time 0.00
Received By rrossano Date 01-13-2022 Time   Sent To  
Notes
***NONE***

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status F Date 12-02-2021 Cont ID  
Sent By rrossano Date 12-02-2021 Time   Rev Time  
Received By rrossano Date 12-02-2021 Time   Sent To  
Notes
2021-12-02 20:11:50COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR, ENG.
 SERVICES DEPT., 561-494-1098 [email protected] :
  
 GENERAL:
 O PLEASE RESPOND TO ALL COMMENTS IN WRITING, AND
 INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER
 (Z-XXXXXXXX).
 O THE CITY OF WEST PALM BEACH HAS A NUMBER OF
 REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY
 AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND
 WASTEWATER UTILITIES WITHIN THE CITY. PLEASE SEE
 DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AT THE LINK
 BELOW:
 A. HTTP://WPB.ORG/CMSPAGES/GETAMAZONFILE.ASPX?PATH=~\WP
 B_WEBSITE\MEDIA\ENGINEERING\DEVELOPMENT-APPLICATION-FUL
 L-PACKAGE_2016.PDF&HASH=7BD4DD7EB6115181D8C5977BCC02A97
 B1960045731D3658206F27451722716EF
 B. THIS AND OTHER RELATED ENGINEERING DOCUMENTS CAN BE
 FOUND HERE:
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
 C. ALSO SEE: CODE OF ORDINANCES, CITY OF WEST PALM
 BEACH, FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08,
 ADOPTED SEPT. 22, 2008. (SUPPLEMENT NO. 18)
 CHAPTER 90 UTILITIES, ARTICLE I. IN GENERAL,
 SEC. 90-7. POLICY REGARDING EXTENSION OF WATER OR SEWER
 SERVICE FACILITIES OF THE CITY.
 THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE
 CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY
 BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS,
 BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION.
 O AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR
 MORE INFORMATION, REFER TO THE LINK BELOW:
 A. HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PU
 BLICATIONS/BACKFLOW-CROSS-CONNECTION- CONTROL-MANUAL
 O PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY
 OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC
 RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF
 YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE
 MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL
 IN THE WPB ENGINEERING SERVICES DEPARTMENT AT
 [email protected] OR 561-494-1079 FOR FURTHER
 ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION
 ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD
 SURVEY, POT-HOLING, SOFT DIGS ETC.
 O SHEET 6.00 ? FORMAL ENGINEERING PLANS SHALL INCLUDE
 REVISED WATER/SEWER DEMANDS.
 O SHEETS C5.10 AND C6.11 ? PLEASE UPDATE STANDARD
 DETAILS TO CURRENT VERSIONS.
  
  
 BACKFLOW ASSEMBLY AND METERS (IF ANY):
 O SHOW AND LABEL ANY EXISTING OR PROPOSED WATER
 SERVICES AND WATER METERS, ALONG WITH WHAT IS HAPPENING
 TO THEM.
 O SHOW EXISTING AND PROPOSED DEDICATED UTILITY
 EASEMENTS TO ALLOW ACCESS FOR CITY PERSONNEL TO
 PROPOSED UTILITY WATER METERS. VERIFY THAT THERE ARE NO
 STRUCTURES WITHIN EASEMENT.
 O PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED LOCATION
 OF WATER METER AND BACKFLOW
 PREVENTION.
 O BACKFLOWS SHALL BE INSTALLED ON PRIVATE PROPERTY
 OUTSIDE OF EASEMENTS AND RIGHTS OF WAY. DOMESTIC WATER
 METERS SHALL BE INSTALLED IMMEDIATELY ADJACENT TO
 PROPERTY LINE. 3 INCH AND LARGER WATER METERS SHALL BE
 INSTALLED ABOVE-GROUND ONLY.
 O CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA (MAKE
 NOTE USC APPROVED) AND FIRE BACKFLOW PREVENTER AS DCDA.
  
 WATER/WASTEWATER PLAN:
 O PROVIDE VERTICAL DATUM AND DATUM CONVERSION
 INFORMATION (NAVD 1988 AND NGVD 1929).
 O SHOW PROJECT ADDRESS ON ALL PLAN SHEETS.
 O PROVIDE LEGEND ON ALL PLAN SHEETS TO INCLUDE
 STREETLIGHT, SIGN POSTS, TRANSFORMER BOXES ETC.
 O PLANS SHALL SHOW EXISTING AND PROPOSED LOCATIONS AND
 DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND
 SEWER LINES AND CLEANOUTS, INCLUDING STUBS TO EACH
 PROPERTY LINE FOR WATER AND SANITARY SEWERS, THE MAKE
 AND MODEL OF ALL VALVES, POTABLE AND IRRIGATION METERS,
 BACKFLOWS, FIRE HYDRANTS AND FDCS, AND OTHER DEVICES TO
 BE INSTALLED ON THE SYSTEM, CATCH BASINS, CULVERTS,
 DITCHES INCLUDING GRADES, PIPES SIZES, MATERIALS,
 ELEVATIONS, ASSUMPTIONS, CALCULATIONS, INVERT
 ELEVATIONS FOR ALL INLETS AND MANHOLES AND PROFILES OF
 SANITARY SEWER LINES.
 O GATE VALVE BOXES SHALL NOT BE INSTALLED IN CURB OR
 SIDEWALK. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE
 PROFILE VIEW.
 O DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN
 VIEW FOR ALL SANITARY AND STORM SEWERS.
 O SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL.
 O PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED
 UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC,
 ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION
 FACILITIES LOCATED ON THE RIGHT-OF-WAY.
 O PROVIDE PROFILE AND CLEARANCES BETWEEN WATER, SEWER
 AND STORM LINES PER CITY OF WEST PALM BEACH STANDARD
 DETAIL GN-2 SERIES, AT ALL UTILITY CROSSINGS.
 O SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE DIRECTLY
 TO ENGINEERING (SHEET 33 OF CITY OF WPB DEVELOPMENT
 APPLICATION). PROVIDE CALCULATIONS ON PLANS OF EXISTING
 AND PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE,
 MAXIMUM AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS
 SHALL BE PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008
 FOR WATER.
 O PROVIDE FIRE FLOW TEST DATA.
 O PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND
 STORMWATER INFRASTRUCTURE ALONG ENTIRE PROJECT FRONTAGE
 (IF PROPOSED).
 O CUT AND CAP UTILITIES NOT IN USE AND REMOVE ANY
 ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY
 ROW.
 O CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY
 SEWER ARE REQUIRED.
 O ADD NOTE TO PLANS SPECIFYING CITY?S DOWNSTREAM LIFT
 STATION NUMBER.
 O LABEL WATER LINES AS PRIVATE WHERE APPLICABLE.
 O PLEASE SHOW AND LABEL EXISTING AND PROPOSED GREASE
 TRAPS (IF ANY).
 O PER CITY STANDARDS MAINTAIN MINIMUM DISTANCE BETWEEN
 OUTSIDE DIAMETER OF CITY PIPE AND ROOT BARRIER.
  
 FORMAL ENGINEERING REVIEW:
 O FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND NPDES
 NOI REQUIREMENTS WILL BE ENFORCED.
 - AN NOI IS REQUIRED FOR PROJECTS THAT:
 - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS
 THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF
 DEVELOPMENT OR SALE;
 - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE
 STATE OR TO SURFACE WATERS OF THE STATE THROUGH A
 MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4).
 - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF
 CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION
 THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL
 SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT
 OF THE 10-2 CERTIFICATION.
 O FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES OF
 WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS.
 O FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING
 APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT
 SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING
 SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED
 LEAD-FREE DESIGN.
 O FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 CALCULATIONS OF PERVIOUS AND IMPERVIOUS AREAS FOR
 PROPOSED IMPROVED AREAS.
  
 COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPER., WPB PUBLIC UTILITIES, 561-494-2262 OR
 [email protected]:
  
 -WHAT WILL BE THE ADDITIONAL WATER AND SEWER DEMAND
 FROM THE PROPOSED BUILDINGS?
  
 -VERIFY THAT ALL EXISTING WATER AND SEWER
 INFRASTRUCTURE INCLUDING METERED WATER SERVICES, LIFT
 STATIONS, AND PIPING WILL BE SUFFICIENT FOR ANY
 INCREASED WATER AND SEWER DEMAND.
  
 -THE METERED WATER SERVICE AND BACKFLOW ASSEMBLY LAYOUT
 ON THE NORTHWEST CORNER MONUMENT DETAIL ON PLAN LP-5
 DOES NOT SEEM TO BE ACCURATE. PLEASE VERIFY THAT THE
 PROPOSED MONUMENT WILL NOT CONFLICT WITH THE TWO METER
 BOXES FOR THE TWO INCH WATER METERS WEST OF FENCE.
  
 COMMENTS FROM MICHAEL TECHNOW, PROJECT ENGINEER, WPB
 PUBLIC UTILITIES, 561-494-1047, [email protected] :
  
 -HOW MUCH OF THE 4? FIRE LINE WILL BE
 ABANDONED/GROUTED? IF THE WHOLE LINE IS TO BE ABANDONED
 IT MUST BE CUT AND CAPPED AT THE MAIN ON MILITARY AND
 THEY WILL NEED TO INSTALL AN INSERTION VALVE AT THE
 TEE.
 -IS THIS 4? LINE PRIVATE? IT IS LISTED AS CITY OWNED IN
 GIS, BUT THAT DOESN?T LOOK CORRECT. IF IT IS CITY OWNED
 THE EASEMENT NEEDS TO BE CALLED OUT ON THE PLANS. IF
 NOT LABEL AS PRIVATE.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
  
 QUESTIONS AND COORDINATION CONTACTS:
 O MARK HURLEY, FIELD CUSTOMER SERVICE SUPERVISOR WITH
 CITY OF WPB PUBLIC UTILITIES, REGARDING PLACEMENT OF
 BACKFLOW DEVICES AND WATER METERS. CONTACT HIM AT
 561-494-2262 OR [email protected]
 O RICK ROSSANO, SR. PROJECT COORDINATOR, ENGINEERING
 SERVICES DEPARTMENT AT 561-494-1098 [email protected]
 O MIKE TECHNOW, PROJECT ENGINEER, PUBLIC UTILITIES
 DEPARTMENT AT 561-494-1047 OR [email protected]
 O TRACY WARD, SR. STORMWATER ENGINEER, ENGINEERING
 SERVICES DEPT. AT 561-494-1120 OR [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 01-04-2022 Cont ID  
Sent By pleduc Date 01-04-2022 Time   Rev Time 0.00
Received By pleduc Date 01-04-2022 Time 13:55 Sent To  
Notes
2022-01-04 13:56:17FIRE HAS NO OBJECTIONS TO THE PROPOSED AND APPROVES.
  
 FIRE'S APPROVAL OF THIS SUBMITTED PROJECT MAY NOT
 CONSTITUTE IT'S FINAL REVIEW OR APPROVAL.
  
 FIRE SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT THE
 APPROPRIATE TIME AND IN ACCORDANCE WITH THE
 REQUIREMENTS OF ALL APPLICABLE FIRE CODES AND
 STANDARDS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 12-06-2021 Cont ID  
Sent By pleduc Date 12-06-2021 Time   Rev Time 0.00
Received By pleduc Date 12-06-2021 Time 09:46 Sent To  
Notes
2021-12-06 09:53:59FIRE HAS NO OBJECTIONS TO THE PROPOSED AND APPROVES.
  
 FIRE'S APPROVAL OF THIS SUBMITTED PROJECT MAY NOT
 CONSTITUTE IT'S FINAL REVIEW OR APPROVAL.
  
 FIRE SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT THE
 APPROPRIATE TIME AND IN ACCORDANCE WITH THE
 REQUIREMENTS OF ALL APPLICABLE FIRE CODES AND
 STANDARDS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop L LANDSCAPING
Rev No 4 Status P Date 02-22-2022 Cont ID  
Sent By rcaranci Date 02-22-2022 Time 17:02 Rev Time 0.00
Received By rcaranci Date 02-22-2022 Time 17:01 Sent To  
Notes
2022-02-22 17:02:22FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: ANIMAL RESCUE LEAGUE CSPD Z21110019
 FEBRUARY 22, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. MAKE THE FOLLOWING CORRECTIONS TO THE TREE
 DISPOSITION PLAN AND LIST:
 ? SATISFIED. PROVIDE THE CANOPY DIAMETER FOR ALL TREES
 PROPOSED TO BE REMOVED AND PROVIDE THE ACTUAL SQUARE
 FOOTAGE MITIGATION DUE FOR ANY THAT ARE 20 FEET OR MORE
 DIAMETER.
 ? SATISFIED. RECORD THE MITIGATION SQUARE FOOTAGE DUE
 BASED ON CATEGORY FOR ALL TREES LESS THAN 20 FEET
 CANOPY DIAMETER AND PALMS THAT ARE PROPOSED FOR
 REMOVAL.
 ? SATISFIED. PROVIDE A TOTAL FOR THE MITIGATION SQUARE
 FOOTAGE DUE.
 ? SATISFIED. PROVIDE AN ARBORIST REPORT ON CONDITION
 AND RELOCATION POTENTIAL FOR ALL SLASH PINE TREES
 PROPOSED TO BE REMOVED.
 ? SATISFIED. PROVIDE THE MITIGATION CREDITS FOR NEW
 TREES ADDED TO SHOW ALL MITIGATION DUE IS COVERED ON
 SHEET LP-3. CORRECT OR REMOVE INFORMATION FROM SHEET
 LP-1.
  
 2. SATISFIED. PER SECTION 94-443(B) PROVIDE THE 5 FOOT
 LANDSCAPE BUFFER ALONG THE SOUTH, EAST AND NORTH
 PROPERTY LINES FOR THE NEW AREA ADDED TO THE PD.
 PROVIDE THE AFFECTED AREA AND INCLUDE ALL CALCULATIONS
 AND PLANT LIST ON THE LANDSCAPE PLANS.
  
 3. SATISFIED. PER SECTION 94-443 (E)2., PROVIDE THE 30%
 (NOT 40%) FOUNDATION PLANTING CALCULATION REQUIRED AND
 PROVIDED FOR THE NEW BUILDINGS.
  
 4. SATISFIED. REMOVE PREFERRED PLANT LABELS FROM THE
 COLUMNS ON THE PLANT SCHEDULE. SHOULD BE NATIVE OR
 DROUGHT TOLERANT COLUMNS.
  
 5. SATISFIED. ADD RELOCATED SABAL PALMS TO THE PLANT
 LIST.
  
 6. SATISFIED. PROVIDE A SECTION IN A LANDSCAPE DATA
 CHART TO COMPLY WITH SECTION 94-445 L. PLANT SPECIES. A
 MINIMUM OF 60 PERCENT OF PLANT MATERIAL ADDED SHALL BE
 FLORIDA NATIVE OR DROUGHT TOLERANT SPECIES SELECTED
 FROM THE CITY LIST OR THE LIST OF SPECIES IN THE MOST
 RECENT EDITION OF SOUTH FLORIDA WATER MANAGEMENT
 DISTRICT WATERWISE SOUTH FLORIDA LANDSCAPES. PROVIDE
 THE TOTAL PERCENTAGE OF NATIVE AND DROUGHT TOLERANT
 PLANTS BASED ON FINAL PLANT LIST.
  
 7. SATISFIED. THE LOCATIONS OF UTILITY LINES FOR THE
 NEW RESTROOM INCLUDING ELECTRIC, WATER AND SEWER
 CONFLICT WITH EXISTING TREES. ROUTE THE LINES TO AVOID
 DAMAGE OF ROOT SYSTEMS.
 LOCATIONS OF PROPOSED UTILITIES STILL CONFLICT WITH
 SOME EXISTING TREES AND PALMS. THE REQUIRED TERMINAL
 LANDSCAPE ISLAND AND THE REQUIRED TREE AT THE SOUTH END
 OF THE ROW OF PARKING IS ALSO BEING IMPACTED.
  
 8. SATISFIED. ON THE WEST SIDE OF THE PROPOSED
 MAINTENANCE BUILDING, SIDEWALK ACCESS FROM THE ADA
 SPACE SHOULD BE MOVED EAST TO ALLOW THE TERMINAL
 LANDSCAPE AREA ADJACENT TO THE SPACE TO RUN THE FULL
 LENGTH OF THE SPACE.
  
 THIS SUBMITTAL SHOWS THE TREE PUSHED TOO FAR NORTH DUE
 TO PROPOSED UTILITY PLACEMENT TO PROVIDE THE BENEFITS
 INTENDED FOR THE PARKING. REDESIGN UTILITIES TO BE
 NORTH OF THE REQUIRED LANDSCAPE AREA.
  
 9. SATISFIED. EXISTING TREES ALONG THE BUFFER NORTH OF
 THE PROPOSED MAINTENANCE BUILDING APPEAR TO HAVE
 PAVEMENT PROPOSED IN CONFLICT WITH THEIR LOCATIONS.
 REVISE SITE PLAN AND LANDSCAPE PLAN.
 ADDITIONAL COMMENTS 1/10/22:
 10. SATISFIED. NOTES REGARDING THE MILITARY TRAIL
 LANDSCAPE BUFFER NEED TO BE REMOVED FROM SHEET LP-2 AND
 ANY CHANGES PROPOSED SUBMITTED IN ORDER TO PASS FINAL
 REVIEW.
 ADDITIONAL COMMENTS 2/14/22:
 11. SATISFIED. TREE 66 IS SHOWN ON THE LANDSCAPE PLAN
 IN CONFLICT WITH THE UTILITIES BUT IS INDICATED TO BE
 REMOVED ON THE TREE DISPOSITION PLAN. CORRECT ON
 LANDSCAPE PLAN.
  
 12. SATISFIED. ON SHEET LP-3 CONVERT ALL MITIGATION DUE
 TO SQUARE FOOTAGE AND PROVIDE A TOTAL. PROVIDE THE
 TOTAL CANOPY CREDIT SQUARE FOOTAGE OF TREES ADDED AND
 SHOW TOTAL PROVIDED BASED ON THE PLANT LIST.
  
 13. SATISFIED. CORRECT THE REQUIRED NUMBER OF BUFFER
 TREES REQUIRED FOR THE NORTH BUFFER TO 19. PROVIDE THE
 REQUIRED TREES.
  
 14. SATISFIED. CORRECT THE REQUIRED NUMBER OF BUFFER
 TREES ON SHEET LP-4 TO NORTH- 18, EAST-7 AND SOUTH-17.
 TOTAL LENGTH OF BUFFER IS DIVIDED BY 30 AND ROUNDED UP
 FOR ANY PORTION ABOVE. PROVIDE THE REQUIRED TREES.
  
 15. SATISFIED. PROVIDE A BREAKDOWN OF HOW THE TREE
 COUNT IS MET FOR EACH BUFFER. THIS WOULD INCLUDE A LIST
 OF THE EXISTING TREES AND PALMS COUNTED TOWARD THE
 BUFFER REQUIREMENTS.
  
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop L LANDSCAPING
Rev No 3 Status F Date 02-14-2022 Cont ID  
Sent By rcaranci Date 02-14-2022 Time 17:20 Rev Time 0.00
Received By rcaranci Date 02-14-2022 Time 17:20 Sent To  
Notes
2022-02-14 17:21:20FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: ANIMAL RESCUE LEAGUE CSPD Z21110019
 FEBRUARY 14, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. MAKE THE FOLLOWING CORRECTIONS TO THE TREE
 DISPOSITION PLAN AND LIST:
 ? SATISFIED. PROVIDE THE CANOPY DIAMETER FOR ALL TREES
 PROPOSED TO BE REMOVED AND PROVIDE THE ACTUAL SQUARE
 FOOTAGE MITIGATION DUE FOR ANY THAT ARE 20 FEET OR MORE
 DIAMETER.
 ? SATISFIED. RECORD THE MITIGATION SQUARE FOOTAGE DUE
 BASED ON CATEGORY FOR ALL TREES LESS THAN 20 FEET
 CANOPY DIAMETER AND PALMS THAT ARE PROPOSED FOR
 REMOVAL.
 ? SATISFIED. PROVIDE A TOTAL FOR THE MITIGATION SQUARE
 FOOTAGE DUE.
 ? SATISFIED. PROVIDE AN ARBORIST REPORT ON CONDITION
 AND RELOCATION POTENTIAL FOR ALL SLASH PINE TREES
 PROPOSED TO BE REMOVED.
 ? SATISFIED. PROVIDE THE MITIGATION CREDITS FOR NEW
 TREES ADDED TO SHOW ALL MITIGATION DUE IS COVERED ON
 SHEET LP-3. CORRECT OR REMOVE INFORMATION FROM SHEET
 LP-1.
  
 2. SATISFIED. PER SECTION 94-443(B) PROVIDE THE 5 FOOT
 LANDSCAPE BUFFER ALONG THE SOUTH, EAST AND NORTH
 PROPERTY LINES FOR THE NEW AREA ADDED TO THE PD.
 PROVIDE THE AFFECTED AREA AND INCLUDE ALL CALCULATIONS
 AND PLANT LIST ON THE LANDSCAPE PLANS.
  
 3. SATISFIED. PER SECTION 94-443 (E)2., PROVIDE THE 30%
 (NOT 40%) FOUNDATION PLANTING CALCULATION REQUIRED AND
 PROVIDED FOR THE NEW BUILDINGS.
  
 4. SATISFIED. REMOVE PREFERRED PLANT LABELS FROM THE
 COLUMNS ON THE PLANT SCHEDULE. SHOULD BE NATIVE OR
 DROUGHT TOLERANT COLUMNS.
  
 5. SATISFIED. ADD RELOCATED SABAL PALMS TO THE PLANT
 LIST.
  
 6. SATISFIED. PROVIDE A SECTION IN A LANDSCAPE DATA
 CHART TO COMPLY WITH SECTION 94-445 L. PLANT SPECIES. A
 MINIMUM OF 60 PERCENT OF PLANT MATERIAL ADDED SHALL BE
 FLORIDA NATIVE OR DROUGHT TOLERANT SPECIES SELECTED
 FROM THE CITY LIST OR THE LIST OF SPECIES IN THE MOST
 RECENT EDITION OF SOUTH FLORIDA WATER MANAGEMENT
 DISTRICT WATERWISE SOUTH FLORIDA LANDSCAPES. PROVIDE
 THE TOTAL PERCENTAGE OF NATIVE AND DROUGHT TOLERANT
 PLANTS BASED ON FINAL PLANT LIST.
  
 7. SATISFIED. THE LOCATIONS OF UTILITY LINES FOR THE
 NEW RESTROOM INCLUDING ELECTRIC, WATER AND SEWER
 CONFLICT WITH EXISTING TREES. ROUTE THE LINES TO AVOID
 DAMAGE OF ROOT SYSTEMS.
 LOCATIONS OF PROPOSED UTILITIES STILL CONFLICT WITH
 SOME EXISTING TREES AND PALMS. THE REQUIRED TERMINAL
 LANDSCAPE ISLAND AND THE REQUIRED TREE AT THE SOUTH END
 OF THE ROW OF PARKING IS ALSO BEING IMPACTED.
  
 8. SATISFIED. ON THE WEST SIDE OF THE PROPOSED
 MAINTENANCE BUILDING, SIDEWALK ACCESS FROM THE ADA
 SPACE SHOULD BE MOVED EAST TO ALLOW THE TERMINAL
 LANDSCAPE AREA ADJACENT TO THE SPACE TO RUN THE FULL
 LENGTH OF THE SPACE.
  
 THIS SUBMITTAL SHOWS THE TREE PUSHED TOO FAR NORTH DUE
 TO PROPOSED UTILITY PLACEMENT TO PROVIDE THE BENEFITS
 INTENDED FOR THE PARKING. REDESIGN UTILITIES TO BE
 NORTH OF THE REQUIRED LANDSCAPE AREA.
  
 9. SATISFIED. EXISTING TREES ALONG THE BUFFER NORTH OF
 THE PROPOSED MAINTENANCE BUILDING APPEAR TO HAVE
 PAVEMENT PROPOSED IN CONFLICT WITH THEIR LOCATIONS.
 REVISE SITE PLAN AND LANDSCAPE PLAN.
 ADDITIONAL COMMENTS 1/10/22:
 10. SATISFIED. NOTES REGARDING THE MILITARY TRAIL
 LANDSCAPE BUFFER NEED TO BE REMOVED FROM SHEET LP-2 AND
 ANY CHANGES PROPOSED SUBMITTED IN ORDER TO PASS FINAL
 REVIEW.
 ADDITIONAL COMMENTS 2/14/22:
 11. TREE 66 IS SHOWN ON THE LANDSCAPE PLAN IN CONFLICT
 WITH THE UTILITIES BUT IS INDICATED TO BE REMOVED ON
 THE TREE DISPOSITION PLAN. CORRECT ON LANDSCAPE PLAN.
  
 12. ON SHEET LP-3 CONVERT ALL MITIGATION DUE TO SQUARE
 FOOTAGE AND PROVIDE A TOTAL. PROVIDE THE TOTAL CANOPY
 CREDIT SQUARE FOOTAGE OF TREES ADDED AND SHOW TOTAL
 PROVIDED BASED ON THE PLANT LIST.
  
 13. CORRECT THE REQUIRED NUMBER OF BUFFER TREES
 REQUIRED FOR THE NORTH BUFFER TO 19. PROVIDE THE
 REQUIRED TREES.
  
 14. CORRECT THE REQUIRED NUMBER OF BUFFER TREES ON
 SHEET LP-4 TO NORTH- 18, EAST-7 AND SOUTH-17. TOTAL
 LENGTH OF BUFFER IS DIVIDED BY 30 AND ROUNDED UP FOR
 ANY PORTION ABOVE. PROVIDE THE REQUIRED TREES.
  
 15. PROVIDE A BREAKDOWN OF HOW THE TREE COUNT IS MET
 FOR EACH BUFFER. THIS WOULD INCLUDE A LIST OF THE
 EXISTING TREES AND PALMS COUNTED TOWARD THE BUFFER
 REQUIREMENTS.
  
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop L LANDSCAPING
Rev No 2 Status F Date 01-10-2022 Cont ID  
Sent By rcaranci Date 01-10-2022 Time 15:23 Rev Time 0.00
Received By rcaranci Date 01-10-2022 Time 15:23 Sent To  
Notes
2022-01-10 15:23:39FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: ANIMAL RESCUE LEAGUE CSPD Z21110019
 JANUARY 10, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. MAKE THE FOLLOWING CORRECTIONS TO THE TREE
 DISPOSITION PLAN AND LIST:
 ? SATISFIED. PROVIDE THE CANOPY DIAMETER FOR ALL TREES
 PROPOSED TO BE REMOVED AND PROVIDE THE ACTUAL SQUARE
 FOOTAGE MITIGATION DUE FOR ANY THAT ARE 20 FEET OR MORE
 DIAMETER.
 ? SATISFIED. RECORD THE MITIGATION SQUARE FOOTAGE DUE
 BASED ON CATEGORY FOR ALL TREES LESS THAN 20 FEET
 CANOPY DIAMETER AND PALMS THAT ARE PROPOSED FOR
 REMOVAL.
 ? SATISFIED. PROVIDE A TOTAL FOR THE MITIGATION SQUARE
 FOOTAGE DUE.
 ? SATISFIED. PROVIDE AN ARBORIST REPORT ON CONDITION
 AND RELOCATION POTENTIAL FOR ALL SLASH PINE TREES
 PROPOSED TO BE REMOVED.
 ? SATISFIED. PROVIDE THE MITIGATION CREDITS FOR NEW
 TREES ADDED TO SHOW ALL MITIGATION DUE IS COVERED ON
 SHEET LP-3. CORRECT OR REMOVE INFORMATION FROM SHEET
 LP-1.
  
 2. SATISFIED. PER SECTION 94-443(B) PROVIDE THE 5 FOOT
 LANDSCAPE BUFFER ALONG THE SOUTH, EAST AND NORTH
 PROPERTY LINES FOR THE NEW AREA ADDED TO THE PD.
 PROVIDE THE AFFECTED AREA AND INCLUDE ALL CALCULATIONS
 AND PLANT LIST ON THE LANDSCAPE PLANS.
  
 3. SATISFIED. PER SECTION 94-443 (E)2., PROVIDE THE 30%
 (NOT 40%) FOUNDATION PLANTING CALCULATION REQUIRED AND
 PROVIDED FOR THE NEW BUILDINGS.
  
 4. SATISFIED. REMOVE PREFERRED PLANT LABELS FROM THE
 COLUMNS ON THE PLANT SCHEDULE. SHOULD BE NATIVE OR
 DROUGHT TOLERANT COLUMNS.
  
 5. SATISFIED. ADD RELOCATED SABAL PALMS TO THE PLANT
 LIST.
  
 6. SATISFIED. PROVIDE A SECTION IN A LANDSCAPE DATA
 CHART TO COMPLY WITH SECTION 94-445 L. PLANT SPECIES. A
 MINIMUM OF 60 PERCENT OF PLANT MATERIAL ADDED SHALL BE
 FLORIDA NATIVE OR DROUGHT TOLERANT SPECIES SELECTED
 FROM THE CITY LIST OR THE LIST OF SPECIES IN THE MOST
 RECENT EDITION OF SOUTH FLORIDA WATER MANAGEMENT
 DISTRICT WATERWISE SOUTH FLORIDA LANDSCAPES. PROVIDE
 THE TOTAL PERCENTAGE OF NATIVE AND DROUGHT TOLERANT
 PLANTS BASED ON FINAL PLANT LIST.
  
 7. PARTIALLY SATISFIED. THE LOCATIONS OF UTILITY LINES
 FOR THE NEW RESTROOM INCLUDING ELECTRIC, WATER AND
 SEWER CONFLICT WITH EXISTING TREES. ROUTE THE LINES TO
 AVOID DAMAGE OF ROOT SYSTEMS.
 LOCATIONS OF PROPOSED UTILITIES STILL CONFLICT WITH
 SOME EXISTING TREES AND PALMS. THE REQUIRED TERMINAL
 LANDSCAPE ISLAND AND THE REQUIRED TREE AT THE SOUTH END
 OF THE ROW OF PARKING IS ALSO BEING IMPACTED.
  
  
  
 8. PARTIALLY SATISFIED. ON THE WEST SIDE OF THE
 PROPOSED MAINTENANCE BUILDING, SIDEWALK ACCESS FROM THE
 ADA SPACE SHOULD BE MOVED EAST TO ALLOW THE TERMINAL
 LANDSCAPE AREA ADJACENT TO THE SPACE TO RUN THE FULL
 LENGTH OF THE SPACE.
  
 THIS SUBMITTAL SHOWS THE TREE PUSHED TOO FAR NORTH DUE
 TO PROPOSED UTILITY PLACEMENT TO PROVIDE THE BENEFITS
 INTENDED FOR THE PARKING. REDESIGN UTILITIES TO BE
 NORTH OF THE REQUIRED LANDSCAPE AREA.
  
 9. SATISFIED. EXISTING TREES ALONG THE BUFFER NORTH OF
 THE PROPOSED MAINTENANCE BUILDING APPEAR TO HAVE
 PAVEMENT PROPOSED IN CONFLICT WITH THEIR LOCATIONS.
 REVISE SITE PLAN AND LANDSCAPE PLAN.
 ADDITIONAL COMMENTS 1/10/22:
 10. NOTES REGARDING THE MILITARY TRAIL LANDSCAPE BUFFER
 NEED TO BE REMOVED FROM SHEET LP-2 AND ANY CHANGES
 PROPOSED SUBMITTED IN ORDER TO PASS FINAL REVIEW.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop L LANDSCAPING
Rev No 1 Status F Date 12-03-2021 Cont ID  
Sent By rcaranci Date 12-03-2021 Time 16:11 Rev Time 0.00
Received By rcaranci Date 12-03-2021 Time 16:11 Sent To  
Notes
2021-12-03 16:11:41FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: ANIMAL RESCUE LEAGUE CSPD Z21110019
 DECEMBER 3, 2021
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. MAKE THE FOLLOWING CORRECTIONS TO THE TREE
 DISPOSITION PLAN AND LIST:
 ? PROVIDE THE CANOPY DIAMETER FOR ALL TREES PROPOSED TO
 BE REMOVED AND PROVIDE THE ACTUAL SQUARE FOOTAGE
 MITIGATION DUE FOR ANY THAT ARE 20 FEET OR MORE
 DIAMETER.
 ? RECORD THE MITIGATION SQUARE FOOTAGE DUE BASED ON
 CATEGORY FOR ALL TREES LESS THAN 20 FEET CANOPY
 DIAMETER AND PALMS THAT ARE PROPOSED FOR REMOVAL.
 ? PROVIDE A TOTAL FOR THE MITIGATION SQUARE FOOTAGE
 DUE.
 ? PROVIDE AN ARBORIST REPORT ON CONDITION AND
 RELOCATION POTENTIAL FOR ALL SLASH PINE TREES PROPOSED
 TO BE REMOVED.
 ? PROVIDE THE MITIGATION CREDITS FOR NEW TREES ADDED TO
 SHOW ALL MITIGATION DUE IS COVERED ON SHEET LP-3.
 CORRECT OR REMOVE INFORMATION FROM SHEET LP-1.
  
 2. PER SECTION 94-443(B) PROVIDE THE 5 FOOT LANDSCAPE
 BUFFER ALONG THE SOUTH, EAST AND NORTH PROPERTY LINES
 FOR THE NEW AREA ADDED TO THE PD. PROVIDE THE AFFECTED
 AREA AND INCLUDE ALL CALCULATIONS AND PLANT LIST ON THE
 LANDSCAPE PLANS.
  
 3. PER SECTION 94-443 (E)2., PROVIDE THE 30% (NOT 40%)
 FOUNDATION PLANTING CALCULATION REQUIRED AND PROVIDED
 FOR THE NEW BUILDINGS.
  
 4. REMOVE PREFERRED PLANT LABELS FROM THE COLUMNS ON
 THE PLANT SCHEDULE. SHOULD BE NATIVE OR DROUGHT
 TOLERANT COLUMNS.
  
 5. ADD RELOCATED SABAL PALMS TO THE PLANT LIST.
  
 6. PROVIDE A SECTION IN A LANDSCAPE DATA CHART TO
 COMPLY WITH SECTION 94-445 L. PLANT SPECIES. A MINIMUM
 OF 60 PERCENT OF PLANT MATERIAL ADDED SHALL BE FLORIDA
 NATIVE OR DROUGHT TOLERANT SPECIES SELECTED FROM THE
 CITY LIST OR THE LIST OF SPECIES IN THE MOST RECENT
 EDITION OF SOUTH FLORIDA WATER MANAGEMENT DISTRICT
 WATERWISE SOUTH FLORIDA LANDSCAPES. PROVIDE THE TOTAL
 PERCENTAGE OF NATIVE AND DROUGHT TOLERANT PLANTS BASED
 ON FINAL PLANT LIST.
  
 7. THE LOCATIONS OF UTILITY LINES FOR THE NEW RESTROOM
 INCLUDING ELECTRIC, WATER AND SEWER CONFLICT WITH
 EXISTING TREES. ROUTE THE LINES TO AVOID DAMAGE OF ROOT
 SYSTEMS.
  
 8. ON THE WEST SIDE OF THE PROPOSED MAINTENANCE
 BUILDING, SIDEWALK ACCESS FROM THE ADA SPACE SHOULD BE
 MOVED EAST TO ALLOW THE TERMINAL LANDSCAPE AREA
 ADJACENT TO THE SPACE TO RUN THE FULL LENGTH OF THE
 SPACE.
  
 9. EXISTING TREES ALONG THE BUFFER NORTH OF THE
 PROPOSED MAINTENANCE BUILDING APPEAR TO HAVE PAVEMENT
 PROPOSED IN CONFLICT WITH THEIR LOCATIONS. REVISE SITE
 PLAN AND LANDSCAPE PLAN.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop PW PUBLIC WORKS
Rev No 3 Status P Date 02-15-2022 Cont ID  
Sent By   Date 02-15-2022 Time   Rev Time 0.00
Received By   Date 02-15-2022 Time   Sent To  
Notes
2022-02-15 10:45:21NO FURTHER COMMENTS.
  
 MATT HEJAZI
 DEPT OF PUBLIC WORKS
 [email protected]
 561-822-2045

Review Stop PW PUBLIC WORKS
Rev No 2 Status F Date 01-04-2022 Cont ID  
Sent By   Date 01-04-2022 Time   Rev Time 0.00
Received By   Date 01-04-2022 Time   Sent To  
Notes
2022-01-04 15:39:58PLEASE PROVIDE THE DUMPSTER ENCLOSURE DETAIL FOR THE
 ENCLOSURE TO BE LOCATED ON THE NORTH OF THE 12TH STREET
 ACROSS THE DETENTION POND.FOR A FREESTANDING SITE
 DUMPSTER ENCLOSURE, THE ENCLOSURE SHALL COMPLY WITH THE
 LATEST REVISION OF CITY OF WEST PALM BEACH GENERAL
 CONSTRUCTION-GARBAGE ENCLOSURE STANDARD, GC-7
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045

Review Stop PW PUBLIC WORKS
Rev No 1 Status F Date 12-08-2021 Cont ID  
Sent By   Date 12-08-2021 Time   Rev Time  
Received By   Date 12-08-2021 Time   Sent To  
Notes
2021-12-08 14:43:30PLEASE PROVIDE:
 1- DUMPSTER ENCLOSURE DETAIL. FOR A FREESTANDING SITE
 DUMPSTER ENCLOSURE, THE ENCLOSURE SHALL COMPLY WITH THE
 LATEST REVISION OF CITY OF WEST PALM BEACH GENERAL
 CONSTRUCTION-GARBAGE ENCLOSURE STANDARD, GC-7.
 2 - AUTOTURN EXHIBIT (DYNAMIC ENVELOPE AND THE
 VEHICLE?S WHEEL PATH) FOR THE SANITATION SERVICE, FRONT
 LOADER TRUCK WITH THE FOLLOWING SPECS:
 - DUAL AXLES
 - TRUCK LENGTH: 35 FT
 - TRUCK WIDTH: 11 FT
 - TURNING RADIUS:
 - SAE TURNING RADIUS: 32.5 FT
 - CURB-TO-CURB DIAMETER: 74 FT
 - WALL-TO-WALL DIAMETER: 86.3 FT
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045
  

Review Stop STORM STORMWATER
Rev No 1 Status P Date 12-09-2021 Cont ID  
Sent By tward Date 12-09-2021 Time 10:11 Rev Time 0.00
Received By tward Date 12-09-2021 Time 10:14 Sent To  
Notes
2021-12-09 10:14:121. CHECK WITH SFWMD TO SEE IF THE ERP NEEDS TO BE
 MODIFIED. SUBMIT WITH ENGINEERING PERMIT APPLICATION.
  
 TRACY WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120
  

Review Stop SURVEY SURVEYING
Rev No 2 Status P Date 01-20-2022 Cont ID  
Sent By vnoel Date 01-20-2022 Time 07:05 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
***NONE***

Review Stop SURVEY SURVEYING
Rev No 1 Status F Date 12-03-2021 Cont ID  
Sent By vnoel Date 12-03-2021 Time 08:45 Rev Time  
Received By vnoel Date   Time   Sent To  
Notes
2021-12-03 09:02:471. NOT ALL PROPERTY CORNERS ARE SHOWN AS FOUND OR SET.
 2. IDENTIFY WHO THE "BY OTHERS" IMPROVEMENTS WERE
 SURVEYED BY.
 3. AREA OF IMPROVEMENTS IS WITHIN THE CITY SERVICE
 AREA.

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 3 Status P Date 02-14-2022 Cont ID  
Sent By   Date 02-14-2022 Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
2022-02-14 20:26:24APPROVED WITH THE FOLLOWING CONDITIONS:
 1. NEWLY COLLECTED TRAFFIC COUNTS WILL BE REQUIRED AT
 THE NEXT DEVELOPMENT ITERATION. TRIP GENERATION RATES
 SHALL BE UPDATED ACCORDINGLY
 2. AN UPDATED U-TURN ANALYSIS FOR THE LOCATIONS
 SHOWCASED IN THE 2018 TRAFFIC STUDY WILL BE REQUIRED AT
 THE NEXT DEVELOPMENT ITERATION
  
 TRAFFIC COMMENTS
 1) SATISFIED. PROVIDE THE 2007 STUDY JUSTIFYING THE
 TRIP GENERATION CALCULATIONS. THE PROVIDED STUDY IS
 INCOMPLETE, SOME FIGURES AND TABLES ARE MISSING
 2) SATISFIED. PROVIDE DOCUMENTATION SUBSTANTIATING
 VESTED TRIPS AND APPROVED DRIVEWAYS. PLEASE SCHEDULE A
 MEETING TO REVIEW LATEST TRAFFIC STUDY ASSUMPTIONS AND
 RESULTS.
 3) SATISFIED. PROVIDE COUNTY TPS LETTER
 4) SATISFIED. DUE TO THE VERY OLD TRAFFIC COUNTS? AGE
 (I.E. 2007) ON WHICH THE LATEST TRAFFIC STUDY IS BASED
 ON, A RECOUNT MAY BE WARRANTED, AS TRAFFIC PATTERNS AND
 VOLUMES MAY HAVE SIGNIFICANTLY CHANGED SINCE THEN.
 NEWLY COLLECTED TRAFFIC COUNTS WILL BE REQUIRED AT THE
 NEXT DEVELOPMENT ITERATION.
 5) SATISFIED. INCLUDE MAINTENANCE BUILDING IN THE TRIP
 GENERATION CALCULATION
 6) SATISFIED. PROVIDE EXISTING CONDITIONS SITE PLAN
 7) SATISFIED. PROVIDE DETAILS OF THE FUTURE PHASE OF
 DEVELOPMENT/EXPANSION BUILDING(S) AND INCLUDE IN THE
 TRIP GENERATION CALCULATION
 SITE COMMENTS
 8) SATISFIED. PROVIDE SIDEWALK AND WALKWAYS? DIMENSIONS
 IN THE SITE PLAN
 9) SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE
 TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND OUT OF THE
 PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES
 CLEARLY DEFINED. ANALYSIS SHOULD BE PROVIDED IN A
 SEPARATE FILE/DRAWING. PLEASE PROVIDE DOCUMENT NAME AND
 SHEET NUMBER SHOWCASING THE ANALYSIS. LATEST SUBMISSION
 ONLY PROVIDES VEHICLES? PATHS ENTERING AND OPERATING
 WITHIN THE FACILITY, PLEASE PROVIDE VEHICLES? EXITING
 PATH AS WELL.
 10) SATISFIED. PROVIDE PARKING TABLE SHOWCASING THE
 NUMBER OF REQUIRED AND PROVIDED PARKING SPACES,
 INCLUSIVE OF ADA AND BICYCLE ONES
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 2 Status F Date 01-14-2022 Cont ID  
Sent By   Date 01-14-2022 Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
2022-01-14 18:29:07TRAFFIC COMMENTS
 1) PARTIALLY SATISFIED. PROVIDE THE 2007 STUDY
 JUSTIFYING THE TRIP GENERATION CALCULATIONS. THE
 PROVIDED STUDY IS INCOMPLETE, SOME FIGURES AND TABLES
 ARE MISSING
 2) PARTIALLY SATISFIED. PROVIDE DOCUMENTATION
 SUBSTANTIATING VESTED TRIPS AND APPROVED DRIVEWAYS.
 PLEASE SCHEDULE A MEETING TO REVIEW LATEST TRAFFIC
 STUDY ASSUMPTIONS AND RESULTS.
 3) SATISFIED. PROVIDE COUNTY TPS LETTER
 4) NOT SATISFIED. DUE TO THE VERY OLD TRAFFIC COUNTS'
 AGE (I.E. 2007) ON WHICH THE LATEST TRAFFIC STUDY IS
 BASED ON, A RECOUNT MAY BE WARRANTED, AS TRAFFIC
 PATTERNS AND VOLUMES MAY HAVE SIGNIFICANTLY CHANGED
 SINCE THEN
 5) NOT SATISFIED. INCLUDE MAINTENANCE BUILDING IN THE
 TRIP GENERATION CALCULATION
 6) NOT SATISFIED. PROVIDE EXISTING CONDITIONS SITE PLAN
 7) NOT SATISFIED. PROVIDE DETAILS OF THE FUTURE PHASE
 OF DEVELOPMENT/EXPANSION BUILDING(S) AND INCLUDE IN THE
 TRIP GENERATION CALCULATION
 8) SATISFIED. PROVIDE SIDEWALK AND WALKWAYS' DIMENSIONS
 IN THE SITE PLAN
 9) PARTIALLY SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR
 GARBAGE TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND
 OUT OF THE PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC
 ENVELOPES CLEARLY DEFINED. ANALYSIS SHOULD BE PROVIDED
 IN A SEPARATE FILE/DRAWING. PLEASE PROVIDE DOCUMENT
 NAME AND SHEET NUMBER SHOWCASING THE ANALYSIS. LATEST
 SUBMISSION ONLY PROVIDES VEHICLES' PATHS ENTERING AND
 OPERATING WITHIN THE FACILITY, PLEASE PROVIDE VEHICLES'
 EXITING PATHS AS WELL.
 10) SATISFIED. PROVIDE PARKING TABLE SHOWCASING THE
 NUMBER OF REQUIRED AND PROVIDED PARKING SPACES,
 INCLUSIVE OF ADA AND BICYCLE ONES
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status F Date 12-09-2021 Cont ID  
Sent By   Date 12-09-2021 Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
2021-12-09 12:45:25TRAFFIC COMMENTS
 1) PROVIDE THE 2007 STUDY JUSTIFYING THE TRIP
 GENERATION CALCULATIONS
 2) PROVIDE DOCUMENTATION SUBSTANTIATING VESTED TRIPS
 AND APPROVED DRIVEWAYS
 3) PROVIDE COUNTY TPS LETTER
  
 SITE COMMENTS
 4) PROVIDE SIDEWALK AND WALKWAYS? DIMENSIONS IN THE
 SITE PLAN
 5) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND/OR
 SERVICE VEHICLES DRIVING IN AND OUT OF THE PROPOSED
 DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES CLEARLY
 DEFINED. ANALYSIS SHOULD BE PROVIDED IN A SEPARATE
 FILE/DRAWING. PLEASE PROVIDE DOCUMENT NAME AND SHEET
 NUMBER SHOWCASING THE ANALYSIS.
 6) PROVIDE PARKING TABLE SHOWCASING THE NUMBER OF
 REQUIRED AND PROVIDED PARKING SPACES, INCLUSIVE OF ADA
 AND BICYCLE ONES
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop Z ZONING
Rev No 3 Status P Date 02-14-2022 Cont ID  
Sent By eschneid Date 02-14-2022 Time 16:05 Rev Time 0.50
Received By eschneid Date 02-14-2022 Time 11:29 Sent To  
Notes
2022-02-14 16:07:271) CONDITION - THE NEXT TIME THAT AN AMENDMENT UPDATES
 A SHEET CONTAINING THE ADOPTION CENTER, THE WESTERN
 ARMS SHALL BE RELABELED AS "FUTURE ENCLOSURE" TO
 REFLECT THAT EXTERIOR WALLS HAVE BEEN CONSTRUCTED FOR
 THE OUTDOOR PLAY AREAS AND THAT THIS AREA MAY BE
 ENCLOSED TO CREATE INTERIOR SPACE.
  
 2) CONDITION - THE SOLID WALL/FENCE SECTION NORTH OF
 THE MAINTENANCE BUILDING MUST BE INSTALLED PRIOR TO THE
 CERTIFICATE OF OCCUPANCY FOR THE MAINTENANCE BUILDING.
  
 3) CONDITION - BANNERS AND OTHER TEMPORARY SIGNAGE IS
 PROHIBITED, WHETHER IT IS GROUND, BUILDING OR
 WALL/FENCE MOUNTED, UNLESS INCLUDED AS PART OF AN
 APPROVED SPECIAL EVENT PERMIT. **** PEGGY ADAMS ANIMAL
 RESCUE LEAGUE IS NOT A CULTURAL FACILITY, SO SECTION
 94-407.16 DOES NOT APPLY TO THEM. FURTHERMORE, THE
 TEMPORARY SIGNAGE THAT HAS BEEN INSTALLED ON SITE DOES
 NOT COMPLY WITH THE STANDARDS OUTLINED IN THE
 REFERENCED CODE SECTION. THE EXISTING SIGN PLAN AS WELL
 AS THIS AMENDMENT PERMIT INCREASES TO THE NUMBER OF
 SIGNS ON THE ADOPTION CENTER AND ON THE SITE IN EXCESS
 OF WHAT IS PERMITTED BY RIGHT. THE ALLOWANCE OF
 ADDITIONAL BANNERS ARE NOT SUPPORTED BY STAFF. ****
  
 4) CONDITION - PRIOR TO THE CERTIFICATE OF OCCUPANCY
 (C.O.) FOR THE NEW MAINTENANCE BUILDING, THE LANDSCAPE
 BUFFER ALONG 12TH STREET AND HIBISCUS CIRCLE MUST BE
 INSTALLED IN ACCORDANCE WITH SHEET LP-4. AN ALTERNATIVE
 LANDSCAPE BUFFER PLAN MAY BE APPROVED AS PART OF MINOR
 PLANNED DEVELOPMENT AMENDMENT AND IS STILL REQUIRED TO
 BE INSTALLED PRIOR TO THE C.O. OF THE MAINTENANCE
 BUILDING.
  
 AS PART OF BRINGING THE ANNEXED PARCELS INTO THE
 COMMUNITY SERVICE PLANNED DEVELOPMENT, THE STREET SIDE
 EXTERIOR PROPERTY LINES ARE REQUIRED TO HAVE LANDSCAPE
 BUFFERS INSTALLED. THE BUFFERS WILL NEED TO BE
 INSTALLED PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF
 OCCUPANCY FOR THE MAINTENANCE BUILDING THAT IS BEING
 REQUESTED AS PART OF THE MAJOR AMENDMENT. ANGELLA VANN
 ACCEPTED RELOCATION OF THE MATERIAL FROM MILITARY TRAIL
 AND USE OF EXISTING MATERIAL AS PART OF THE REQUIRED
 BUFFER AS AN ALTERNATIVE TO THE INSTALLATION OF ALL NEW
 MATERIAL. SINCE THE RESPONSE STATES THAT THE RELOCATION
 IS A FUTURE PROJECT, THE INSTALLATION SHOWN ON LP-4 IS
 REQUIRED. YOU WILL NOTE THAT STAFF WILL BE INCLUDING
 THE CONDITION PERMITTING AN ALTERNATIVE PLAN TO BE
 APPROVED AS A MINOR PLANNED DEVELOPMENT AMENDMENT,
 WHICH WOULD COVER THE MILITARY TRAIL CHANGE OUT VERSION
 OF THE BUFFER.
  
  

Review Stop Z ZONING
Rev No 2 Status F Date 01-19-2022 Cont ID  
Sent By eschneid Date 01-19-2022 Time 14:43 Rev Time 2.00
Received By eschneid Date 01-19-2022 Time 08:47 Sent To  
Notes
2022-01-19 14:52:03CASE NOS. PB983K, L, M & N - DECEMBER 23, 2021
 RESUBMITTAL
 PEGGY ADAMS ANNEXATION, FLU, REZONE AND CSPD EXPANSION
 3100 N. MILITARY TRAIL - ANNEXATION ALONG 12TH STREET
  
 - CONTACT ERIC SCHNEIDER @ (561) 822-1446,
 [email protected]
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF TWO
 (2) PAPER COPIES AND AN ELECTRONIC COPY IN .PNG FORMAT
 OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS
 TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL
 COMMENTS.
  
 - THE COMMENTS SHALL BE SUFFICIENTLY ADDRESSED AND
 SUBMITTED TO THE PLANNING DIVISION BY 5 PM ON FRIDAY,
 JANUARY 28, 2022, TO BE ELIGIBLE TO BE SCHEDULED FOR
 THE MARCH 15, 2022 PLANNING BOARD MEETING.
  
 - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT
 RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS
 FROM THE DATE OF THESE COMMENTS (BY MARCH 19, 2022),
 THE PLANNING DIVISION MAY NOTIFY THE APPLICANT THAT THE
 CASE IS CONSIDERED WITHDRAWN. ANY FURTHER ACTION SHALL
 REQUIRE A NEW DEVELOPMENT APPLICATION.
  
 - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($600).
  
 - PUBLIC HEARING NOTIFICATION SIGNAGE SHALL BE POSTED
 IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION
 94-39(I)(5) OF THE ZONING AND LAND DEVELOPMENT
 REGULATIONS.
  
 1) REMOVE "FUTURE EXPANSION" OR "PROPOSED" FROM THE
 PLANS WHERE THOSE ITEMS HAVE ALREADY BEEN CONSTRUCTED.
 EX:
  
 A. THE ADOPTION CENTER IS FULLY CONSTRUCTED, THE
 WESTERN AREAS ARE NO LONGER A FUTURE EXPANSION OR A
 PHASE 2.
 B. SIGN #2, WHICH IS CALLED OUT AS EXISTING ON THE SITE
 PLAN AND SIGN DETAILS, YET LISTED AS PROPOSED ON THE
 SECTION 94-408.F.2 COMPLIANCE TEXT ON SHEET SP-2.
  
 2) CONDITION - THE SOLID WALL/FENCE SECTION NORTH OF
 THE MAINTENANCE BUILDING MUST BE INSTALLED PRIOR TO THE
 CERTIFICATE OF OCCUPANCY FOR THE MAINTENANCE BUILDING.
  
 3) CONDITION - BANNERS AND OTHER TEMPORARY SIGNAGE IS
 PROHIBITED, WHETHER IT IS GROUND, BUILDING OR FENCE
 MOUNTED.
  
 LANDSCAPE ITEMS:
  
 4) THE LANDSCAPE PLANS SUBMITTED WITH THE MAJOR
 AMENDMENT APPLICATION MUST SHOW EITHER:
  
 A. THE CURRENT APPROVED LANDSCAPE ALONG MILITARY TRAIL.
 GREY AREAS STATING EXISTING PLANT MATERIAL TO REMAIN
 NEEDS TO BE CHANGED TO REFLECT WHAT THE MATERIAL
 ACTUALLY IS. THE EXISTING TREES/PALMS NEED TO BE SHOWN
 AND TAGGED. THE RESPONSES STATE THAT PAARL WISHES TO
 HAVE A MINOR AMENDMENT APPROVED FOR CHANGES TO THE
 MILITARY TRAIL BUFFER PRIOR TO THE MAJOR AMENDMENT
 BEING FINALIZED. AT SUCH POINT THAT A MINOR AMENDMENT
 IS APPROVED, THE MAJOR AMENDMENT LANDSCAPE PLANS MUST
 BE UPDATED TO REFLECT THE APPROVAL. PLEASE NOTE IF THE
 MAJOR AMENDMENT IS SCHEDULED FOR CITY COMMISSION PRIOR
 TO THE MINOR AMENDMENT APPROVAL, THEN THE MINOR
 AMENDMENT WILL NOT BE APPROVED BY STAFF PRIOR TO THE
 CITY COMMISSION RESOLUTION OF THIS AMENDMENT.
 B. THE LANDSCAPE THAT PAARL WOULD LIKE TO HAVE AS THE
 END LAYOUT. THIS OPTION HAS NO MINOR AMENDMENT.
  
 5) IN EITHER CHOICE A OR B, THE NOTE ON THE LANDSCAPE
 PLAN REFERRING TO THE LATER SUBMITTAL MUST BE REMOVED.
  
 6) AS OF YET, NO MINOR AMENDMENT HAS BEEN SUBMITTED TO
 FOR PLANNING STAFF REVIEW. IF YOU WISH TO MOVE FORWARD
 WITH A RECONFIGURED MILITARY TRAIL BUFFER SEPARATE FROM
 THE MAJOR AMENDMENT, THEN YOU MUST SUBMIT A MINOR
 AMENDMENT APPLICATION.
  
 7) WHICHEVER ROUTE IS CHOSEN FOR THE MILITARY TRAIL
 LANDSCAPE CHANGES, YOU NEED TO SUBMIT LANDSCAPE PLANS
 SHOWING THESE CHANGES. THE INFORMATION PROVIDED TO DATE
 DOES NOT INCLUDE ADEQUATE INFORMATION FOR STAFF TO
 REVIEW FOR COMPLIANCE WITH THE LANDSCAPE REQUIREMENTS.
 THE PLANS MUST CLEARLY IDENTIFY ALL THE TREES/PALMS IN
 THE RECONFIGURED BUFFER, BOTH REMAINING AND PROPOSED,
 AS WELL AS THE DISTANCE BETWEEN ANY TREES THAT EXCEED
 30 FEET. THIS WILL PERMIT STAFF TO VERIFY IF THE
 RECONFIGURED BUFFER COMPLIES WITH ALL CODE
 REQUIREMENTS. IF IT DOES NOT, THEN STAFF WILL NEED TO
 USE THE INFORMATION TO DETERMINE IF A WAIVER(S) IS
 REQUIRED AND IF STAFF WILL SUPPORT THE WAIVER(S).
  
 8) AS PART OF BRINGING THE ANNEXED PARCELS INTO THE
 COMMUNITY SERVICE PLANNED DEVELOPMENT, THE STREET SIDE
 EXTERIOR PROPERTY LINES ARE REQUIRED TO HAVE LANDSCAPE
 BUFFERS INSTALLED. THE BUFFERS WILL NEED TO BE
 INSTALLED PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF
 OCCUPANCY FOR THE MAINTENANCE BUILDING THAT IS BEING
 REQUESTED AS PART OF THE MAJOR AMENDMENT.
  

Review Stop Z ZONING
Rev No 1 Status F Date 12-09-2021 Cont ID  
Sent By eschneid Date 12-09-2021 Time 12:17 Rev Time 2.00
Received By eschneid Date 12-09-2021 Time 12:16 Sent To  
Notes
2021-12-09 12:18:19CASE NOS. PB983K, L, M & N
 PEGGY ADAMS ANNEXATION, FLU, REZONE AND CSPD EXPANSION
 3100 N. MILITARY TRAIL - ANNEXATION ALONG 12TH STREET
  
 - CONTACT ERIC SCHNEIDER @ (561) 822-1446,
 [email protected]
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF FOUR
 (4) PAPER COPIES AND AN ELECTRONIC COPY IN .PNG FORMAT
 OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS
 TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL
 COMMENTS.
  
 - THE PPRC COMMENTS SHALL BE SUFFICIENTLY ADDRESSED AND
 SUBMITTED TO THE PLANNING DIVISION BY 5 PM ON THURSDAY,
 DECEMBER 23, 2021, TO BE ELIGIBLE TO BE SCHEDULED FOR
 THE FEBRUARY 15, 2022 PLANNING BOARD MEETING.
  
 - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT
 RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS
 FROM THE DATE OF THE PPRC MEETING (BY FEBRUARY 9,
 2022), THE PLANNING DIVISION MAY NOTIFY THE APPLICANT
 THAT THE CASE IS CONSIDERED WITHDRAWN. ANY FURTHER
 ACTION SHALL REQUIRE A NEW DEVELOPMENT APPLICATION.
  
 - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($600).
  
 - PUBLIC HEARING NOTIFICATION SIGNAGE SHALL BE POSTED
 IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION
 94-39(I)(5) OF THE ZONING AND LAND DEVELOPMENT
 REGULATIONS.
  
 PB983K: ANNEXATION
  
 NO COMMENT.
  
 PB983L: CS FUTURE LAND USE ASSIGNMENT
  
 NO COMMENT.
  
 PB983M: CS ZONING ASSIGNMENT
  
 NO COMMENT.
  
 PB983N: CSPD EXPANSION
  
 1) PLEASE PROVIDE INFORMATION ON THE VEHICLE SIZE AND
 FREQUENCY THAT WILL BE ACCESSING THE ROLL UP DOORS AT
 THE NEW MAINTENANCE BUILDING. STAFF IS CONCERNED THE
 15-FOOT WIDTH OF THE ENTRY DRIVE MAY BE TOO NARROW.
  
 2) THE ROLL UP DOORS AND THUS THE LOADING AND ACTIVITY
 FOR THE MAINTENANCE BUILDING FACE A RESIDENTIAL
 DEVELOPMENT. STAFF IS CONCERNED WITH THE NEGATIVE
 IMPACTS THAT MAY RESULT FROM THIS ACTIVITY AREA FACING
 TO THE NORTH. IF THE BUILDING CANNOT BE FLIPPED, THEN
 THE REQUIRED SOLID WALL/FENCE MUST BE INSTALLED TO
 BUFFER THE IMPACTS OF THE NEW STRUCTURE FROM THE
 RESIDENTIAL DISTRICT.
  
 3) THE EXISTING TREES ALONG THE NORTH PROPERTY LINE,
 NORTH OF THE MAINTENANCE BUILDING, ARE SHOWN IN THE
 PAVED AREA.
  
 4) THE MAINTENANCE BUILDING CONTAINS MORE THAN JUST
 STORAGE. THE ACTUAL USES AND THEIR SQUARE FOOTAGE NEED
 TO BE REFLECTED ON THE REQUIRED PARKING TABLE.
  
 5) THE NEW STORAGE SQUARE FOOTAGE AT THE MEMORIAL
 PAVILION EXPANSION NEEDS TO BE REFLECTED ON THE PARKING
 TABLE.
  
 6) THE PARKING TABLE LISTS 7 LESS PARKING SPACES
 PROVIDED FROM THE LAST MINOR AMENDMENT APPROVAL. STAFF
 CAN ONLY LOCATE 2 SPACES REMOVED BY THE TEMPORARY
 TRAILERS. PLEASE CLARIFY.
  
 7) THE SIGNS ARE REQUESTING A WAIVER FROM THE INCORRECT
 SECTION OF THE ZONING AND LAND DEVELOPMENT REGULATIONS.
 THE WAIVERS NEED TO BE SHOWN FROM SECTION 94-408.F.2,
 WHICH REGULATES SIGNS IN THE COMMUNITY SERVICE ZONING
 DISTRICT (NOTE: THERE MAY BE LESS REQUIRED). PLEASE
 NOTE THAT THE NUMBER OF FREE-STANDING SIGNS ON THE SITE
 WILL BE CORRECTED TO PERMIT FOUR TOTAL SIGNS (CURRENTLY
 THERE SHOULD HAVE BEEN A WAIVER FOR THE TWO SIGNS).
  
 8) THE NORTH ENTRANCE TO THE SITE IS INTENDED ONLY FOR
 SERVICE VEHICLES AND NOT THE GENERAL PUBLIC. THE
 JUSTIFICATION STATEMENT INDICATES THAT THIS NEW SIGN IS
 FOR WAYFINDING AT THE ENTRANCE POINTS; HOWEVER, THIS IS
 NOT AN ACTUAL ENTRANCE POINT FOR THE PUBLIC, WHICH
 WOULD RESULT IN A POTENTIAL PROBLEM WITH A MEMBER OF
 THE PUBLIC TRYING TO ENTER THE SITE AT THIS LOCATION.
 IF A SIGN IS NECESSARY HERE, THEN IT SHOULD INCLUDE A
 NOTE STATING, "SERVICE ENTRANCE ONLY", EITHER REPLACING
 OR UNDERNEATH THE "EUNICE J. GARDINER CAMPUS". IF THE
 SECOND OPTION, THEN THE FONT NEEDS TO BE SMALLER.
  