Plan Review Details - Project Z21100018
| Plan Review Stops For Project Z21100018 |
| Review Stop |
AIPP |
ART IN PUBLIC PLACES |
| Rev No |
2 |
Status |
P |
Date |
05-16-2023 |
|
|
Cont ID |
|
| Sent By |
swelter |
Date |
05-16-2023 |
Time |
13:08 |
Rev Time |
0.00 |
| Received By |
swelter |
Date |
05-16-2023 |
Time |
13:10 |
Sent To |
|
|
| Notes |
| 2023-05-16 13:09:04 | PASSED, SUBJECT TO THE FOLLOWING CONDITION: | | | | | | 1.) LABEL IN THE PLAN SHEETS AND KEY PLAN SHEETS THE | | | LOCATION OF THE INTERACTIVE SCULPTURE/PUBLIC ART | | | | | | | | | |
|
|
| Review Stop |
AIPP |
ART IN PUBLIC PLACES |
| Rev No |
1 |
Status |
F |
Date |
11-18-2021 |
|
|
Cont ID |
|
| Sent By |
scwelter |
Date |
11-18-2021 |
Time |
10:51 |
Rev Time |
0.00 |
| Received By |
scwelter |
Date |
11-18-2021 |
Time |
11:03 |
Sent To |
|
|
| Notes |
| 2021-11-18 11:03:15 | PROJECT IS SUBJECT TO PUBLIC ART REQUIREMENT. CAFE AND | | | THE COMMUNITY EVENT BUILDINGS WILL BE OVER $500,000 IN | | | TOTAL CONSTRUCTION COSTS THEREFORE BY ORDINANCE 1% OF | | | THAT COST MUST BE DEPOSITED INTO THE PUBLIC ART | | | ACCOUNT. PUBLIC ART ON THE SITE WILL BE MANAGED THROUGH | | | THE ARTLIFE WPB (PUBLIC ART) PROGRAM. | | | | | | CONTACT SYBILLE WELTER, ADMINISTRATOR OF PUBLIC ART & | | | CULTURE AT [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
11-17-2021 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
11-17-2021 |
Time |
13:04 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
11-17-2021 |
Time |
19:16 |
Sent To |
|
|
| Notes |
| 2021-11-17 19:30:49 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. DEMOLITION OF THE EXISTING BUILDINGS. AN ASBESTOS | | | SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT | | | REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH | | | COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963, | | | OR BY EMAIL: [email protected] | | | | | | 3. FLOOD ZONE. ACCORDING TO THE ADOPTED FLOOD INSURANCE | | | RATE MAPS (FIRMS), THE PROPOSED BUILDING IS IN CURRENT | | | FLOOD ZONE AE WITH A BASE FLOOD ELEVATION OF 6 FT NAVD | | | BUT, ALTHOUGH THE CITY OF WEST PALM BEACH HAS SUBMITTED | | | AN APPEAL TO FEMA, PLEASE NOTE THAT THE FEMA PROPOSED | | | FLOOD ZONE IS VE WITH A BASE FLOOD ELEVATION OF 9 FT | | | NAVD. IF THE APPEAL IS DENIED, THEN THE FEMA PROPOSED | | | FLOOD ELEVATION WILL BE APPLICABLE. IF THE PERMIT IS | | | ISSUED PRIOR TO THE DATE OF APPEAL RESOLUTION (AS YET | | | UNKNOWN), THE CURRENT BASE FLOOD ELEVATION WILL BE | | | APPLICABLE. THE FIRST FLOOR OF THE BUILDING AND ALL | | | ASSOCIATED MECHANICAL EQUIPMENT (CHILLERS, GENERATORS | | | ETC.) SHALL BE 24 INCHES (FREEBOARD) ABOVE THE BASE | | | FLOOD ELEVATION. | | | | | | 4. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 5. GREASE INTERCEPTOR. A GREASE INTERCEPTOR WILL BE | | | REQUIRED. FOR INFORMATION ON THE REQUIRED TYPE, SIZE | | | AND LOCATION, PLEASE CONTACT TIM LARGE, CHIEF PLUMBING | | | INSPECTOR, DEVELOPMENT SERVICES DEPARTMENT, AT (561) | | | 805-6692, OR BY EMAIL: [email protected] | | | | | | 6. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, GAS SYSTEMS, GENERATORS, FIRE ALARM SYSTEMS, | | | FIRE SPRINKLER AND OTHER FIRE SUPPRESSION SYSTEMS, | | | GREASE INTERCEPTORS, SITE LIGHTING, SITE LANDSCAPE, | | | SITE IRRIGATION, ETC. | | | | | | 7. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT | | | WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL | | | HAVE A SEPARATE ADDRESS ASSIGNED BASED ON THE LOCATION | | | OF THE BUILDING ENTRANCE. FOR STREET ADDRESSING, | | | CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT | | | (561) 805 6659, OR BY EMAIL: [email protected] | | | | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
3 |
Status |
P |
Date |
05-12-2023 |
|
|
Cont ID |
|
| Sent By |
lquinone |
Date |
05-12-2023 |
Time |
15:02 |
Rev Time |
0.00 |
| Received By |
lquinone |
Date |
05-12-2023 |
Time |
15:02 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
F |
Date |
09-22-2022 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
09-22-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
09-22-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-09-22 13:54:25 | COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR, ENG. | | | SERVICES DEPT., 561-494-1098 [email protected] : | | | | | | PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND | | | STORMWATER INFRASTRUCTURE ALONG ENTIRE PROJECT | | | FRONTAGE. *CONDITION OF SITE PLAN APPROVAL* | | | | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
11-16-2021 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
11-16-2021 |
Time |
|
Rev Time |
|
| Received By |
rrossano |
Date |
11-16-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-11-16 06:49:27 | COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR, ENG. | | | SERVICES DEPT., 561-494-1098 [email protected] : | | | | | | INDEX SHEET NUMBERING ON COVER DOES NOT MATCH PLAN | | | SHEET NUMBERING. | | | | | | GENERAL: | | | O PLEASE RESPOND TO ALL COMMENTS IN WRITING, AND | | | INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER | | | (Z-XXXXXXXX). | | | O THE CITY OF WEST PALM BEACH HAS A NUMBER OF | | | REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY | | | AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND | | | WASTEWATER UTILITIES WITHIN THE CITY. PLEASE SEE | | | DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AT THE LINK | | | BELOW: | | | A. HTTP://WPB.ORG/CMSPAGES/GETAMAZONFILE.ASPX?PATH=~\WP | | | B_WEBSITE\MEDIA\ENGINEERING\DEVELOPMENT-APPLICATION-FUL | | | L-PACKAGE_2016.PDF&HASH=7BD4DD7EB6115181D8C5977BCC02A97 | | | B1960045731D3658206F27451722716EF | | | B. THIS AND OTHER RELATED ENGINEERING DOCUMENTS CAN BE | | | FOUND HERE: | | | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR | | | MS,-PERMITS-APPLICATIONS | | | C. ALSO SEE: CODE OF ORDINANCES, CITY OF WEST PALM | | | BEACH, FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, | | | ADOPTED SEPT. 22, 2008. (SUPPLEMENT NO. 18) | | | CHAPTER 90 UTILITIES, ARTICLE I. IN GENERAL, | | | SEC. 90-7. POLICY REGARDING EXTENSION OF WATER OR SEWER | | | SERVICE FACILITIES OF THE CITY. | | | THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE | | | CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY | | | BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS, | | | BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION. | | | O AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH | | | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, | | | STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR | | | MORE INFORMATION, REFER TO THE LINK BELOW: | | | A. HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PU | | | BLICATIONS/BACKFLOW-CROSS-CONNECTION- CONTROL-MANUAL | | | O PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY | | | OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC | | | RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF | | | YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE | | | MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL | | | IN THE WPB ENGINEERING SERVICES DEPARTMENT AT | | | [email protected] OR 561-494-1079 FOR FURTHER | | | ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION | | | ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD | | | SURVEY, POT-HOLING, SOFT DIGS ETC. | | | | | | BACKFLOW ASSEMBLY AND METERS: | | | O SHOW AND LABEL ANY EXISTING OR PROPOSED WATER | | | SERVICES AND WATER METERS FOR THE PARKING LOTS, ALONG | | | WITH WHAT IS HAPPENING TO THEM. | | | O SHOW EXISTING AND PROPOSED DEDICATED UTILITY | | | EASEMENTS TO ALLOW ACCESS FOR CITY PERSONNEL TO | | | PROPOSED UTILITY WATER METERS. VERIFY THAT THERE ARE NO | | | STRUCTURES WITHIN EASEMENT. | | | O PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED LOCATION | | | OF WATER METER AND BACKFLOW | | | PREVENTION. | | | O BACKFLOWS SHALL BE INSTALLED ON PRIVATE PROPERTY | | | OUTSIDE OF EASEMENTS AND RIGHTS OF WAY. DOMESTIC WATER | | | METERS SHALL BE INSTALLED IMMEDIATELY ADJACENT TO | | | PROPERTY LINE. 3 INCH AND LARGER WATER METERS SHALL BE | | | INSTALLED ABOVE-GROUND ONLY. | | | O CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA (MAKE | | | NOTE USC APPROVED) AND FIRE BACKFLOW PREVENTER AS DCDA. | | | | | | WATER/WASTEWATER PLAN: | | | O PROVIDE VERTICAL DATUM AND DATUM CONVERSION | | | INFORMATION (NAVD 1988 AND NGVD 1929). | | | O SHOW PROJECT ADDRESS ON ALL PLAN SHEETS. | | | O PROVIDE LEGEND ON ALL PLAN SHEETS TO INCLUDE | | | STREETLIGHT, SIGN POSTS, TRANSFORMER BOXES ETC. | | | O PLANS SHALL SHOW EXISTING AND PROPOSED LOCATIONS AND | | | DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND | | | SEWER LINES AND CLEANOUTS, INCLUDING STUBS TO EACH | | | PROPERTY LINE FOR WATER AND SANITARY SEWERS, THE MAKE | | | AND MODEL OF ALL VALVES, POTABLE AND IRRIGATION METERS, | | | BACKFLOWS, FIRE HYDRANTS AND FDCS, AND OTHER DEVICES TO | | | BE INSTALLED ON THE SYSTEM, CATCH BASINS, CULVERTS, | | | DITCHES INCLUDING GRADES, PIPES SIZES, MATERIALS, | | | ELEVATIONS, ASSUMPTIONS, CALCULATIONS, INVERT | | | ELEVATIONS FOR ALL INLETS AND MANHOLES AND PROFILES OF | | | SANITARY SEWER LINES. | | | O GATE VALVE BOXES SHALL NOT BE INSTALLED IN CURB OR | | | SIDEWALK. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE | | | PROFILE VIEW. | | | O DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN | | | VIEW FOR ALL SANITARY AND STORM SEWERS. | | | O SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT | | | MATERIAL. | | | O PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED | | | UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC, | | | ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION | | | FACILITIES LOCATED ON THE RIGHT-OF-WAY. | | | O PROVIDE PROFILE AND CLEARANCES BETWEEN WATER, SEWER | | | AND STORM LINES PER CITY OF WEST PALM BEACH STANDARD | | | DETAIL GN-2 SERIES, AT ALL UTILITY CROSSINGS. | | | O SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE DIRECTLY | | | TO ENGINEERING (SHEET 33 OF CITY OF WPB DEVELOPMENT | | | APPLICATION). PROVIDE CALCULATIONS ON PLANS OF EXISTING | | | AND PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, | | | MAXIMUM AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS | | | SHALL BE PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 | | | FOR WATER. | | | O PROVIDE FIRE FLOW TEST DATA. | | | O PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND | | | STORMWATER INFRASTRUCTURE ALONG ENTIRE PROJECT | | | FRONTAGE. | | | O CUT AND CAP UTILITIES NOT IN USE AND REMOVE ANY | | | ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY | | | ROW. | | | O WHEN PROPOSED, WATER MAINS IN CITY RIGHT OF WAY SHALL | | | BE MADE OF DUCTILE IRON PIPE (NOT PVC) AND SPECIFY | | | PROPOSED LENGTH IN FEET. | | | O CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY | | | SEWER ARE REQUIRED. | | | O PROVIDE CLEANOUTS FOR PROPOSED SANITARY LINE ONSITE | | | JUST INSIDE PROPERTY LINE, AT JOINTS AND EVERY 75 FEET. | | | O ADD NOTE TO PLANS SPECIFYING CITY?S DOWNSTREAM LIFT | | | STATION NUMBER. | | | O PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR | | | PROPOSED SANITARY LATERALS. | | | O LABEL WATER LINES AS PRIVATE WHERE APPLICABLE. | | | O PLEASE SHOW AND LABEL EXISTING AND PROPOSED GREASE | | | TRAPS (IF ANY). | | | O PER CITY STANDARDS MAINTAIN MINIMUM DISTANCE BETWEEN | | | OUTSIDE DIAMETER OF CITY PIPE AND ROOT BARRIER. | | | | | | FORMAL ENGINEERING REVIEW: | | | O FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND NPDES | | | NOI REQUIREMENTS WILL BE ENFORCED. | | | - AN NOI IS REQUIRED FOR PROJECTS THAT: | | | - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS | | | THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF | | | DEVELOPMENT OR SALE; | | | - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE | | | STATE OR TO SURFACE WATERS OF THE STATE THROUGH A | | | MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4). | | | - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF | | | CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION | | | THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL | | | SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT | | | OF THE 10-2 CERTIFICATION. | | | O FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | EASEMENT FOR PLACEMENT OF PROPOSED WATER METERS. | | | O FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES OF | | | WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS. | | | O FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING | | | APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT | | | SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING | | | SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED | | | LEAD-FREE DESIGN. | | | O FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY LINES | | | ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY | | | LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT | | | PARCELS. | | | O FOR FORMAL ENGINEERING SUBMITTAL, IF WATER LINES ARE | | | BEING REPLACED IN ROW, SHOW ADJACENT PARCEL ADDRESSES. | | | O FOR FORMAL ENGINEERING SUBMITTAL, ADD NOTE TO PROVIDE | | | 50 FT. PAVEMENT RESTORATION TRANSITION ON EACH SIDE OF | | | PROPOSED TRENCH IN CITY MAINTAINED ROADWAY AREAS PER | | | CITY OF WPB STANDARD DETAIL GC-8. | | | O FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | CALCULATIONS OF PERVIOUS AND IMPERVIOUS AREAS FOR | | | PROPOSED IMPROVED AREAS. | | | QUESTIONS AND COORDINATION CONTACTS: | | | O MARK HURLEY, FIELD CUSTOMER SERVICE SUPERVISOR WITH | | | CITY OF WPB PUBLIC UTILITIES, REGARDING PLACEMENT OF | | | BACKFLOW DEVICES AND WATER METERS. CONTACT HIM AT | | | 561-494-2262 OR [email protected] | | | O RICK ROSSANO, SR. PROJECT COORDINATOR, ENGINEERING | | | SERVICES DEPARTMENT AT 561-494-1098 [email protected] | | | O MIKE TECHNOW, PROJECT ENGINEER, PUBLIC UTILITIES | | | DEPARTMENT AT 561-494-1047 OR [email protected] | | | O TRACY WARD, SR. STORMWATER ENGINEER, ENGINEERING | | | SERVICES DEPT. AT 561-494-1120 OR [email protected] | | | | | | COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE | | | SUPER., WPB PUBLIC UTILITIES, 561-494-2262 OR | | | [email protected]: | | | | | | -SHOW AND LABEL ALL EXISTING AND PROPOSED UTILITIES | | | INCLUDING WATER MAINS, WATER SERVICES, WATER METER | | | BOXES, WATER SERVICE PIPING, SEWER MAINS, SEWER | | | LATERALS, STORMWATER PIPES, AND FORCE MAINS. | | | | | | -SHOW AND LABEL ALL EXISTING FRANCHISE UTILITIES IN THE | | | CONSTRUCTION AREAS. | | | | | | -SHOW AND LABEL ANY PROPOSED ELECTRIC TRANSFORMER PADS. | | | | | | -SHOW AND LABEL ALL EXISTING AND PROPOSED GREASE TRAPS | | | OR GREASE INTERCEPTORS. | | | | | | -SHOW AND LABEL ALL EXISTING AND PROPOSED FIRE | | | HYDRANTS. | | | | | | -SHOW AND LABEL ALL EXISTING AND PROPOSED WATER MAIN | | | GATE VALVES. | | | | | | -UTILITIES ON PLANS DO NOT MATCH UTILITIES SHOWN ON WPB | | | GIS. THERE ARE FORCE MAINS AND STORMWATER PIPES NOT | | | SHOWN ON PLANS. SOME GRAVITY SEWER MAINS ON GIS ARE | | | LABELED AS FORCE MAINS ON PLANS. PLEASE VERIFY AND | | | UPDATE AS NEEDED. | | | | | | -ARE THE BUILDINGS WHEELCHAIR ACCESSIBLE? | | | | | | -WILL THERE BE DESIGNATED PARKING SPOTS FOR UTILITY | | | VEHICLES AT LIFT STATION? | | | | | | -THERE ARE SEVERAL ART STATUES OVER UTILITIES CREATING | | | MAINTENANCE CONFLICTS BASED ON PLANS, OR BY COMPARING | | | PLANS TO WPB GIS. PROVIDE SUFFICIENT CLEARANCE DISTANCE | | | SO THAT LARGE DIAMETER UNDERGROUND PIPING CAN BE | | | EXCAVATED WITH HEAVY MACHINERY. | | | | | | -SOME WATER FOUNTAIN PLUMBING PIPE IS RUNNING UNDER AN | | | ART STATUE. THAT MAY MAKE PLUMBING REPAIRS MORE | | | DIFFICULT. | | | | | | -USE DIP INSTEAD OF PVC FOR LARGE WATER MAINS. | | | | | | -ON SHEET C6.05 ADD THE WESTERN SIDESTREEET NAME. | | | | | | -THERE LOOKS TO BE PROPOSED TREES IN A UTILITY EASEMENT | | | WHICH IS TYPICALLY A CONFLICT. PLEASE VERIFY IF THERE | | | ARE CURRENTLY ANY UTILITIES IN THE EASEMENT AND WHAT | | | UTILITIES THE EASEMENT IS FOR. RELOCATE TREES IF | | | POSSIBLE. | | | | | | -VERIFY THERE ARE NO CONFLICTS BETWEEN PROPOSED TREES | | | AND UTILITIES. | | | | | | -IF PUTTING TREES IN LANDSCAPE ISLANDS, MAKE SURE THEY | | | HAVE SUFFICIENT CLEARANCE DISTANCE FROM UTILITIES AND | | | ALSO ADD ROOT BARRIERS AS NECESSARY. | | | | | | -PROPOSED WATER METERS AND BACKFLOW ASSEMBLIES NEED TO | | | BE ADJACENT THE WESTERN PROPERTY LINE AND NOT FAR ON | | | INTERIOR OF PROPERTY. ANY INTERIOR LOOPED SYSTEM WOULD | | | BE PLUMBING AND CAN BE MASTER-METERED AS NEEDED. | | | | | | -METERS 3 INCHES OR LARGER NEED TO BE INSTALLED | | | ABOVE-GROUND AND ACCESSIBLE VIA CRANE TRUCK. | | | | | | -REMOVAL, RELOCATION, OR ALTERATION OF EXISTING METERED | | | WATER SERVICES AT PARK WOULD REQUIRE APPROVAL OF | | | ASSOCIATED CITY DEPARTMENT REPRESENTATIVES. THEY | | | TYPICALLY REQUIRE PROJECT PAY FOR ANY RELATED UTILITY | | | BILLING FEES OR CHARGES. | | | | | | -ON WATER METER LABELS, ADD WHAT THEY ARE GOING TO BE | | | USED FOR. | | | | | | -ARE ANY DEDICATED METERED IRRIGATION WATER SERVICES | | | NEEDED? | | | | | | -SHOW PAVEMENT RESTORATION BOUNDARIES FROM UTILITY WORK | | | AT 26TH AND FLAGLER. | | | | | | COMMENTS FROM MICHAEL TECHNOW, PROJECT ENGINEER, WPB | | | PUBLIC UTILITIES, 561-494-1047, [email protected] : | | | 1) -SHEET C6.03 SHOW SERVICE LINE (FLOATING VALVE) | | | -CALL OUT UTILITY CROSSINGS. | | | -CALL OUT POINT OF SERVICE. | | | -SHOW PROFILE FROM TAP TO POINT OF SERVICE (WATER MAIN | | | & SANITARY SEWER) | | | -SHOW ALL EXISTING DRY UTILITIES. | | | -NOTE MINIMUM REQUIRED DISTANCE BETWEEN ROOT BARRIER | | | AND PIPE PER CITY STANDARDS. | | | COMMENTS FROM BURT BAIRD, CITY OF WPB UTILITIES O&M | | | SUPERINTENDENT, 561-822-2056, [email protected] : | | | ? PLEASE ENSURE ADDED FLOW CAN BE HANDLED BY LS# 23 | | | ? REPLACEMENT OF DAMAGED WOODEN FENCE WITH CHAIN LINK | | | AND DECORATED SCREEN FOR FACE OF THE CITY- SEE EMAILED | | | DOCUMENT FOR FENCE ENCLOSURE LAYOUT | | | ? ADD OR ENSURE PROPER DUMPING RECEPTACLES AROUND THE | | | STATION FOR THE BOATERS. GARBAGE OFTEN GETS THROWN OVER | | | THE FENCE INTO THE LIFT STATION | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
06-02-2023 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
06-02-2023 |
Time |
07:25 |
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
06-02-2023 |
Time |
07:25 |
Sent To |
|
|
| Notes |
| 2023-06-02 07:26:06 | FIRE HAS NO OBJECTIONS TO THE PROPOSED AND APPROVES. | | | | | | FIRE'S APPROVAL OF THIS SUBMITTED PROJECT MAY NOT | | | CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | IF APPLICABLE, FIRE SHALL REVIEW ALL SUBMITTED PROJECT | | | PLANS AT THE APPLICABLE TIME AND IN ACCORDANCE WITH THE | | | REQUIREMENTS OF ALL APPLICABLE FIRE CODES AND | | | STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
09-22-2022 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
09-22-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
09-22-2022 |
Time |
09:59 |
Sent To |
|
|
| Notes |
| 2022-09-22 10:01:06 | AFTER A REVIEW OF THE PPRC RESPONSE PACKET FOR THIS | | | PROJECT, THE PREVIOUSLY SUBMITTED FIRE PREVENTION | | | BUREAU COMMENTS APPEAR TO HAVE BEEN ADDRESSED. | | | | | | HOWEVER, THE BUREAU'S APPROVAL OF THIS SUBMITTED | | | PROJECT DOES NOT CONSTITUTE ITS FINAL REVIEW OR | | | APPROVAL. | | | | | | THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT | | | THE APPROPRIATE TIME AND IN ACCORDANCE WITH THE | | | REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | WEST PALM BEACH FIRE DEPARTMENT | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
11-10-2021 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
11-10-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
11-10-2021 |
Time |
15:26 |
Sent To |
|
|
| Notes |
| 2021-11-10 15:27:37 | FIRE HAS NO OBJECTIONS TO THE PROPOSED AND APPROVES. | | | | | | FIRE'S APPROVAL OF THIS SUBMITTED PROJECT MAY NOT | | | CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | FIRE SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT THE | | | APPROPRIATE TIME AND IN ACCORDANCE WITH THE | | | REQUIREMENTS OF ALL APPLICABLE FIRE CODES AND | | | STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
3 |
Status |
F |
Date |
06-01-2023 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
06-01-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
06-01-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-06-01 16:08:15 | FROM: LINDA LOUIE, SENIOR PLANNER, 561.822.1458/SMITH | | | AMISIAL, LANDSCAPE PLANNER, 561.822.1562 | | | PROJECT: FSPR 21-05 (Z21100018): CURRIE PARK | | | REDEVELOPMENT | | | DATE: JUNE 1, 2022 | | | _______________________________________________________ | | | | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. MAKE THE FOLLOWING CORRECTIONS TO THE TREE | | | DISPOSITION PLAN: | | | | | | 1.1 SATISFIED. X SYMBOL ON TREE DISPOSITION PLANS | | | REPRESENTS REMOVALS AND RELOCATIONS. USE THE X SYMBOL | | | FOR REMOVALS ONLY AND PROVIDE A DIFFERENT SYMBOL FOR | | | RELOCATIONS. | | | | | | 1.2 SATISFIED. PLACE HEADINGS FOR COLUMNS ON ALL | | | DISPOSITION LIST SHEETS. | | | | | | 1.3 SATISFIED. ADD A COLUMN FOR TREE CATEGORY TO THE | | | DISPOSITION LIST SHEETS. | | | | | | 1.4 NOT SATISFIED. FOR TREES LESS THAN 20 FEET CANOPY | | | DIAMETER AND PALMS THE CANOPY SQUARE FOOTAGE TO BE | | | MITIGATED IS BASED ON CATEGORY. LIVE OAK CATEGORY 1 IS | | | 300 SQ FT, CATEGORY 2 IS 150 SQ FT, CATEGORY 3 IS 100 | | | SQ FT, CATEGORY 4 IS 50 SQ FT. COUNT NUMBER OF TRUNKS | | | TIMES CATEGORY VALUE. APPLICANT HAS STATED THIS WILL BE | | | PROVIDED IN A LATER SUPPLEMENT. | | | | | | 1.5 NOT SATISFIED.CORRECTIONS MUST BE MADE TO TREE | | | DISPOSITION CHART: CHINESE FAN PALM AND COCONUT PALMS | | | ARE NOT INVASIVES. PLEASE PROVIDE THEIR CANOPY SQ | | | FOOTAGE. PALM SQUARE FOOTAGE MUST BE PROVIDED THROUGH | | | CATEGORY 3 OR CATEGORY 4 (SEE CATEGORY LIST FOR | | | DETAILS). IT CANNOT BE SHOWN AS 1 FOR 1. PROVIDE THE | | | TOTAL CANOPY SQUARE FOOTAGE THEREAFTER. | | | | | | 1.6 NOT SATISFIED. JAVA BISHOPWOOD AND INDIAN LAUREL | | | FIG ARE NOT INVASIVES. PLEASE PROVIDE THEIR CANOPY | | | SQUARE FOOTAGE AND INCLUDE IT IN MITIGATION | | | CALCULATIONS. | | | | | | 1.7 NOT SATISFIED. CATEGORY 2 TREES REPRESENT 150 | | | SQUARE FT OF CREDIT. HOW IS THE TOTAL 1801? | | | | | | 1.8 NOT SATISFIED. PROVIDE THE TOTAL SQUARE FOOTAGE OF | | | MITIGATION DUE FOR ALL TREES AND PALMS PROPOSED TO BE | | | REMOVED ONCE CORRECTIONS HAVE BEEN MADE. APPLICANT HAS | | | STATED THIS WILL BE PROVIDED IN A LATER | | | SUPPLEMENT.CALCULATIONS MUST BE PROVIDED AFTER | | | CORRECTIONS. | | | | | | 1.9. SATISFIED. TREE CANOPY AREA MEASUREMENT CHART ON | | | SHEET L3.13 IS NOT CORRECT, VALUES SHOWN ARE FOR THE | | | DMP OPEN SPACE CANOPY CREDITS. SEE CATEGORY LIST AND | | | VALUES ABOVE. | | | | | | 1.10 SATISFIED. TOTAL REPLACEMENT CANOPY CREDITS BY | | | CATEGORY WILL NEED TO BE CALCULATED BASED ON THE FINAL | | | PLANT LIST TO SHOW THAT MITIGATION IS MET. | | | | | | 2. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE | | | TREES (AND PALMS) IN GOOD CONDITION TO BE PRESERVED ON | | | SITE OR RELOCATED. PROVIDE AN ARBORIST REPORT FOR THE | | | NATIVE TREES AND PALMS THAT ARE PROPOSED TO BE REMOVED | | | DUE TO CONDITION OR UNABLE TO RELOCATE. | | | | | | 3. SATISFIED. LIGNUM VITAE IS A SMALL TREE AT THE NORTH | | | EDGE OF ITS VIABLE RANGE, AND ORANGE GEIGER MAY NOT DO | | | WELL IN THIS LOCATION. IT IS BETTER TO CHOOSE A MEDIUM | | | NATIVE TREE SUCH AS SILVER BUTTONWOOD THAT WILL THRIVE | | | AT THIS LOCATION. | | | REDUCTION OF QUANTITIES IS NOTED. THIS LOCATION IS | | | ADJACENT TO SALT WATER AND WILL BE SUBJECT TO HIGH WIND | | | AND SALT SPRAY DURING WIND EVENTS SO IS NOT COMPARABLE | | | TO PROTECTED LOCATIONS. | | | | | | 4. SATISFIED. FINAL SPECIES TREE COUNTS WILL NEED TO BE | | | PROVIDED AND SUBSTITUTIONS CAN BE MADE LATER. | | | | | | 5. SATISFIED. IN A LANDSCAPE REQUIREMENT CHART, PROVIDE | | | THE PERCENTAGE AND SQUARE FOOTAGE CALCULATIONS FOR: | | | | | | 5.1 TOTAL NON-BUILDING OPEN SPACE, MUST BE AT LEAST 50% | | | | | | 5.2 TOTAL IMPERVIOUS AREA, CANNOT EXCEED 75% | | | | | | 6. SATISFIED. USING THE 50% OPEN SPACE SQUARE FOOTAGE, | | | CALCULATE THE REQUIRED TREES, FLOWERING TREES AND | | | SHRUBS REQUIRED PER SECTION 94-442(C)(2)B. PROVIDE THE | | | INFORMATION IN THE LANDSCAPE REQUIREMENT CHART. | | | | | | 7. SATISFIED. SECTION 94-443(C)(3) REQUIRES THAT A | | | MINIMUM OF 75 PERCENT OF ALL TREES THAT ARE REQUIRED TO | | | BE PLANTED WITHIN THE INTERIOR OF AN OFF-STREET PARKING | | | AREA SHALL BE CATEGORY 1 SHADE TREES. PROVIDE THE | | | CALCULATIONS IN A LANDSCAPE REQUIREMENT CHART. | | | | | | 8. SATISFIED. PROVIDE AN EXHIBIT SHOWING THE PARKING | | | AREA SURFACE CALCULATIONS, PARKING SPACE AREAS AND | | | LANDSCAPE AREAS PROVIDED TO DEMONSTRATE COMPLIANCE WITH | | | SECTIONS 94-443 (C)(3) AND (4). PROVIDE THE | | | CALCULATIONS IN A LANDSCAPE REQUIREMENT CHART. | | | APPLICANT HAS STATED THIS WILL BE PROVIDED IN A LATER | | | SUPPLEMENT. | | | | | | 9. SATISFIED. LOCATIONS OF SOME EXISTING UTILITIES ARE | | | IN QUESTION. ONCE FINALIZED ON PLANS, TREE CONFLICTS | | | MUST BE ADDRESSED. | | | | | | 10. SATISFIED. SEE COMMENT 6. 50% OPEN SPACE | | | REQUIREMENT SQUARE FOOTAGE IS TO BE CALCULATED BASED ON | | | THE ENTIRE SITE SQUARE FOOTAGE. | | | | | | 11. SATISFIED. CONSIDER SHIFTING TREES TO LOCATIONS TO | | | ELIMINATE THE USE OF ANY ROOT BARRIERS REQUIRED TO | | | PROTECT UTILITY LINES. THIS IS BETTER FOR THE TREES AND | | | SAVES ON COST. | | | | | | 12. SATISFIED. COMPLETE THE FLORIDA FRIENDLY DESIGN | | | OPTION LIST TO PROVIDE THE REQUIRED 50 POINTS. | | | | | | 13. SATISFIED. ARTIFICIAL TURF IS LIMITED TO THE | | | LOCATIONS AS LISTED IN SECTION 94-451. THE CODE DOES | | | NOT ALLOW FOR ARTIFICIAL TURF FOR CITY OWNED LOCATIONS. | | | IF PARKS AND RECREATION DESIRES TO ALLOW IT IN PARK | | | SETTINGS AND DESIRES TO AMEND THE CODE, STAFF NEEDS TO | | | BE NOTIFIED OF THIS. ANY PROPOSED LOCATION NEEDS TO BE | | | CLARIFIED, AS IT APPEARS THAT THE ARTIFICIAL TURF IN | | | THE EXERCISE AREA HAS BEEN CHANGED TO RUBBERIZED | | | SURFACE ON SHEET C-3.02. | | | | | | 14. SATISFIED. SHOW LIGHTING LOCATIONS ON THE LANDSCAPE | | | PLAN AND RESOLVE CONFLICTS. | | | | | | 15. SATISFIED. SHEET L2.11 LANDSCAPE SPECIFICATIONS IS | | | BLANK. | | | | | | 16. SATISFIED. PARKING AREA LOCATED ALONG THE NORTH | | | PROPERTY LINE LACKS THE REQUIRED TERMINAL ISLAND SHADE | | | TREES AT THE ENDS OF THE ROW OF 7 PARKING SPACES. | | | SCREENING HEDGE IS ALSO LACKING ALONG THE WESTERNMOST | | | SPACE. | | | | | | | | | ADDITIONAL COMMENTS 9/20/22: | | | | | | 17. SATISFIED. TERMINAL ISLAND TREE MISSING AT SOUTH | | | END OF ROW OF PARKING FOR THE SOUTH PARKING LOT. IF THE | | | SILVER BUTTONWOOD IS INTENDED TO MEET THIS REQUIREMENT | | | A LARGER SHADE TREE WOULD BE BETTER PLACED TO PROVIDE | | | SHADE FOR THE PARKING. | | | | | | 18. SATISFIED ??? BOAT TRAILER PARKING ALONG NORTH | | | PROPERTY LINE EXEMPTED, AS ONLY MODIFICATIONS MADE TO | | | EXISTING CONFIGURATION. THERE ARE MORE THAN 10 SPACES | | | IN A ROW OF THE REQUIRED PARKING SPACES IN THE NORTH | | | PARKING LOT. SECTION 94-443(C)(3)B. REQUIRES AN | | | INTERIOR LANDSCAPE ISLAND FOR EVERY 10 SPACES IN A ROW. | | | AN ALTERNATIVE OPTION IS TO MEET THE REQUIREMENTS OF | | | 94-443(C)(6) TO PROVIDE ADDITIONAL TREE CANOPY IN THE | | | LANDSCAPE BUFFER. | | | | | | 19. SATISFIED. EXISTING PODOCARPUS HEDGE NEEDS TO BE | | | SHOWN FOR THE EXISTING LIFT STATION SCREENING. | | | | | | 20. SATISFIED. ALL PROPOSED TREES MUST MEET THE MINIMUM | | | 12 FT HEIGHT REQUIREMENT. | | | | | | | | | | | | | | | *** CONDITIONS OF APPROVAL *** | | | | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
F |
Date |
09-20-2022 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
09-20-2022 |
Time |
16:14 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
09-20-2022 |
Time |
16:14 |
Sent To |
|
|
| Notes |
| 2022-09-20 16:14:42 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: CURRIE PARK Z21100018 | | | SEPTEMBER 20, 2022 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. MAKE THE FOLLOWING CORRECTIONS TO THE TREE | | | DISPOSITION PLAN: | | | ??? SATISFIED. X SYMBOL ON TREE DISPOSITION PLANS | | | REPRESENTS REMOVALS AND RELOCATIONS. USE THE X SYMBOL | | | FOR REMOVALS ONLY AND PROVIDE A DIFFERENT SYMBOL FOR | | | RELOCATIONS. | | | ??? SATISFIED. PLACE HEADINGS FOR COLUMNS ON ALL | | | DISPOSITION LIST SHEETS. | | | ??? NOT SATISFIED. ADD A COLUMN FOR TREE CATEGORY TO | | | THE DISPOSITION LIST SHEETS. | | | APPLICANT HAS STATED THIS WILL BE PROVIDED IN A LATER | | | SUPPLEMENT. | | | NOT SATISFIED. FOR TREES LESS THAN 20 FEET CANOPY | | | DIAMETER AND PALMS THE CANOPY SQUARE FOOTAGE TO BE | | | MITIGATED IS BASED ON CATEGORY. LIVE OAK CATEGORY 1 IS | | | 300 SQ FT, CATEGORY 2 IS 150 SQ FT, CATEGORY 3 IS 100 | | | SQ FT, CATEGORY 4 IS 50 SQ FT. COUNT NUMBER OF TRUNKS | | | TIMES CATEGORY VALUE. APPLICANT HAS STATED THIS WILL BE | | | PROVIDED IN A LATER SUPPLEMENT. | | | | | | NOT SATISFIED. PROVIDE THE TOTAL SQUARE FOOTAGE OF | | | MITIGATION DUE FOR ALL TREES AND PALMS PROPOSED TO BE | | | REMOVED ONCE CORRECTIONS HAVE BEEN MADE. APPLICANT HAS | | | STATED THIS WILL BE PROVIDED IN A LATER SUPPLEMENT. | | | | | | ??? SATISFIED. TREE CANOPY AREA MEASUREMENT CHART ON | | | SHEET L3.13 IS NOT CORRECT, VALUES SHOWN ARE FOR THE | | | DMP OPEN SPACE CANOPY CREDITS. SEE CATEGORY LIST AND | | | VALUES ABOVE. | | | ??? SATISFIED. TOTAL REPLACEMENT CANOPY CREDITS BY | | | CATEGORY WILL NEED TO BE CALCULATED BASED ON THE FINAL | | | PLANT LIST TO SHOW THAT MITIGATION IS MET. | | | | | | 2. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE | | | TREES (AND PALMS) IN GOOD CONDITION TO BE PRESERVED ON | | | SITE OR RELOCATED. PROVIDE AN ARBORIST REPORT FOR THE | | | NATIVE TREES AND PALMS THAT ARE PROPOSED TO BE REMOVED | | | DUE TO CONDITION OR UNABLE TO RELOCATE. | | | 3. SATISFIED. LIGNUM VITAE IS A SMALL TREE AT THE NORTH | | | EDGE OF ITS VIABLE RANGE, AND ORANGE GEIGER MAY NOT DO | | | WELL IN THIS LOCATION. IT IS BETTER TO CHOOSE A MEDIUM | | | NATIVE TREE SUCH AS SILVER BUTTONWOOD THAT WILL THRIVE | | | AT THIS LOCATION. | | | REDUCTION OF QUANTITIES IS NOTED. THIS LOCATION IS | | | ADJACENT TO SALT WATER AND WILL BE SUBJECT TO HIGH WIND | | | AND SALT SPRAY DURING WIND EVENTS SO IS NOT COMPARABLE | | | TO PROTECTED LOCATIONS. | | | | | | 4. SATISFIED. FINAL SPECIES TREE COUNTS WILL NEED TO BE | | | PROVIDED AND SUBSTITUTIONS CAN BE MADE LATER. | | | | | | 5. NOT SATISFIED. IN A LANDSCAPE REQUIREMENT CHART, | | | PROVIDE THE PERCENTAGE AND SQUARE FOOTAGE CALCULATIONS | | | FOR: | | | ??? TOTAL NON-BUILDING OPEN SPACE, MUST BE AT LEAST 50% | | | ??? TOTAL IMPERVIOUS AREA, CANNOT EXCEED 75% | | | APPLICANT HAS STATED THIS WILL BE PROVIDED IN A LATER | | | SUPPLEMENT. | | | | | | | | | 6. NOT SATISFIED. USING THE 50% OPEN SPACE SQUARE | | | FOOTAGE, CALCULATE THE REQUIRED TREES, FLOWERING TREES | | | AND SHRUBS REQUIRED PER SECTION 94-442(C)(2)B. PROVIDE | | | THE INFORMATION IN THE LANDSCAPE REQUIREMENT CHART. | | | APPLICANT HAS STATED THIS WILL BE PROVIDED IN A LATER | | | SUPPLEMENT. | | | | | | | | | 7. PARTIALLY SATISFIED. SECTION 94-443(C)(3) REQUIRES | | | THAT A MINIMUM OF 75 PERCENT OF ALL TREES THAT ARE | | | REQUIRED TO BE PLANTED WITHIN THE INTERIOR OF AN OFF | | | STREET PARKING AREA SHALL BE CATEGORY 1 SHADE TREES. | | | PROVIDE THE CALCULATIONS IN A LANDSCAPE REQUIREMENT | | | CHART. | | | APPLICANT HAS STATED THIS WILL BE PROVIDED IN A LATER | | | SUPPLEMENT. | | | | | | 8. NOT SATISFIED. PROVIDE AN EXHIBIT SHOWING THE | | | PARKING AREA SURFACE CALCULATIONS, PARKING SPACE AREAS | | | AND LANDSCAPE AREAS PROVIDED TO DEMONSTRATE COMPLIANCE | | | WITH SECTIONS 94-443 (C)(3) AND (4). PROVIDE THE | | | CALCULATIONS IN A LANDSCAPE REQUIREMENT CHART. | | | APPLICANT HAS STATED THIS WILL BE PROVIDED IN A LATER | | | SUPPLEMENT. | | | | | | 9. SATISFIED. LOCATIONS OF SOME EXISTING UTILITIES ARE | | | IN QUESTION. ONCE FINALIZED ON PLANS, TREE CONFLICTS | | | MUST BE ADDRESSED. | | | | | | 10. ONGOING. SEE COMMENT 6. 50% OPEN SPACE REQUIREMENT | | | SQUARE FOOTAGE IS TO BE CALCULATED BASED ON THE ENTIRE | | | SITE SQUARE FOOTAGE. | | | | | | 11. SATISFIED. CONSIDER SHIFTING TREES TO LOCATIONS TO | | | ELIMINATE THE USE OF ANY ROOT BARRIERS REQUIRED TO | | | PROTECT UTILITY LINES. THIS IS BETTER FOR THE TREES AND | | | SAVES ON COST. | | | | | | 12. NOT SATISFIED. COMPLETE THE FLORIDA FRIENDLY DESIGN | | | OPTION LIST TO PROVIDE THE REQUIRED 50 POINTS. | | | APPLICANT HAS STATED THIS WILL BE PROVIDED IN A LATER | | | SUPPLEMENT. | | | | | | 13. NOT SATISFIED. ARTIFICIAL TURF IS LIMITED TO THE | | | LOCATIONS AS LISTED IN SECTION 94-451. | | | THE CODE DOES NOT ALLOW FOR ARTIFICIAL TURF FOR CITY | | | OWNED LOCATIONS. IF PARKS AND RECREATION DESIRES TO | | | ALLOW IT IN PARK SETTINGS AND DESIRES TO AMEND THE | | | CODE, STAFF NEEDS TO BE NOTIFIED OF THIS. ANY PROPOSED | | | LOCATION NEEDS TO BE CLARIFIED, AS IT APPEARS THAT THE | | | ARTIFICIAL TURF IN THE EXERCISE AREA HAS BEEN CHANGED | | | TO RUBBERIZED SURFACE ON SHEET C-3.02. | | | | | | 14. SATISFIED. SHOW LIGHTING LOCATIONS ON THE LANDSCAPE | | | PLAN AND RESOLVE CONFLICTS. | | | | | | 15. SATISFIED. SHEET L2.11 LANDSCAPE SPECIFICATIONS IS | | | BLANK. | | | | | | 16. SATISFIED. PARKING AREA LOCATED ALONG THE NORTH | | | PROPERTY LINE LACKS THE REQUIRED TERMINAL ISLAND SHADE | | | TREES AT THE ENDS OF THE ROW OF 7 PARKING SPACES. | | | SCREENING HEDGE IS ALSO LACKING ALONG THE WESTERNMOST | | | SPACE. | | | | | | ADDITIONAL COMMENTS 9/20/22: | | | | | | 17. TERMINAL ISLAND TREE MISSING AT SOUTH END OF ROW OF | | | PARKING FOR THE SOUTH PARKING LOT. IF THE SILVER | | | BUTTONWOOD IS INTENDED TO MEET THIS REQUIREMENT A | | | LARGER SHADE TREE WOULD BE BETTER PLACED TO PROVIDE | | | SHADE FOR THE PARKING. | | | | | | 18. THERE ARE MORE THAN 10 SPACES IN A ROW OF THE | | | REQUIRED PARKING SPACES IN THE NORTH PARKING LOT. | | | SECTION 94-443(C)(3)B. REQUIRES AN INTERIOR LANDSCAPE | | | ISLAND FOR EVERY 10 SPACES IN A ROW. AN ALTERNATIVE | | | OPTION IS TO MEET THE REQUIREMENTS OF 94-443(C)(6) TO | | | PROVIDE ADDITIONAL TREE CANOPY IN THE LANDSCAPE BUFFER. | | | | | | 19. EXISTING PODOCARPUS HEDGE NEEDS TO BE SHOWN FOR THE | | | EXISTING LIFT STATION SCREENING. | | | | | | 20. ALL PROPOSED TREES MUST MEET THE MINIMUM 12 FT | | | HEIGHT REQUIREMENT. | | | | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
11-12-2021 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
11-12-2021 |
Time |
15:25 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
11-12-2021 |
Time |
15:25 |
Sent To |
|
|
| Notes |
| 2021-11-12 15:25:27 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: CURRIE PARK Z21100018 | | | NOVEMBER 12, 2021 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. MAKE THE FOLLOWING CORRECTIONS TO THE TREE | | | DISPOSITION PLAN: | | | ? X SYMBOL ON TREE DISPOSITION PLANS REPRESENTS | | | REMOVALS AND RELOCATIONS. USE THE X SYMBOL FOR REMOVALS | | | ONLY AND PROVIDE A DIFFERENT SYMBOL FOR RELOCATIONS. | | | ? PLACE HEADINGS FOR COLUMNS ON ALL DISPOSITION LIST | | | SHEETS. | | | ? ADD A COLUMN FOR TREE CATEGORY TO THE DISPOSITION | | | LIST SHEETS. | | | ? FOR TREES LESS THAN 20 FEET CANOPY DIAMETER AND PALMS | | | THE CANOPY SQUARE FOOTAGE TO BE MITIGATED IS BASED ON | | | CATEGORY. LIVE OAK CATEGORY 1 IS 300 SQ FT, CATEGORY 2 | | | IS 150 SQ FT, CATEGORY 3 IS 100 SQ FT, CATEGORY 4 IS 50 | | | SQ FT. COUNT NUMBER OF TRUNKS TIMES CATEGORY VALUE. | | | ? PROVIDE THE TOTAL SQUARE FOOTAGE OF MITIGATION DUE | | | FOR ALL TREES AND PALMS PROPOSED TO BE REMOVED ONCE | | | CORRECTIONS HAVE BEEN MADE. | | | ? TREE CANOPY AREA MEASUREMENT CHART ON SHEET L3.13 IS | | | NOT CORRECT, VALUES SHOWN ARE FOR THE DMP OPEN SPACE | | | CANOPY CREDITS. SEE CATEGORY LIST AND VALUES ABOVE. | | | ? TOTAL REPLACEMENT CANOPY CREDITS BY CATEGORY WILL | | | NEED TO BE CALCULATED BASED ON THE FINAL PLANT LIST TO | | | SHOW THAT MITIGATION IS MET. | | | | | | 2. SECTION 94-448 (D)(3) REQUIRES NATIVE TREES (AND | | | PALMS) IN GOOD CONDITION TO BE PRESERVED ON SITE OR | | | RELOCATED. PROVIDE AN ARBORIST REPORT FOR THE NATIVE | | | TREES AND PALMS THAT ARE PROPOSED TO BE REMOVED DUE TO | | | CONDITION OR UNABLE TO RELOCATE. | | | 3. LIGNUM VITAE IS A SMALL TREE AT THE NORTH EDGE OF | | | ITS VIABLE RANGE, AND ORANGE GEIGER MAY NOT DO WELL IN | | | THIS LOCATION. IT IS BETTER TO CHOOSE A MEDIUM NATIVE | | | TREE SUCH AS SILVER BUTTONWOOD THAT WILL THRIVE AT THIS | | | LOCATION. | | | | | | 4. FINAL SPECIES TREE COUNTS WILL NEED TO BE PROVIDED | | | AND SUBSTITUTIONS CAN BE MADE LATER. | | | | | | 5. IN A LANDSCAPE REQUIREMENT CHART, PROVIDE THE | | | PERCENTAGE AND SQUARE FOOTAGE CALCULATIONS FOR: | | | ? TOTAL NON-BUILDING OPEN SPACE, MUST BE AT LEAST 50% | | | ? TOTAL IMPERVIOUS AREA, CANNOT EXCEED 75% | | | | | | 6. USING THE 50% OPEN SPACE SQUARE FOOTAGE, CALCULATE | | | THE REQUIRED TREES, FLOWERING TREES AND SHRUBS REQUIRED | | | PER SECTION 94-442(C)(2)B. PROVIDE THE INFORMATION IN | | | THE LANDSCAPE REQUIREMENT CHART. | | | | | | 7. SECTION 94-443(C)(3) REQUIRES THAT A MINIMUM OF 75 | | | PERCENT OF ALL TREES THAT ARE REQUIRED TO BE PLANTED | | | WITHIN THE INTERIOR OF AN OFF STREET PARKING AREA SHALL | | | BE CATEGORY 1 SHADE TREES. PROVIDE THE CALCULATIONS IN | | | A LANDSCAPE REQUIREMENT CHART. | | | | | | 8. PROVIDE AN EXHIBIT SHOWING THE PARKING AREA SURFACE | | | CALCULATIONS, PARKING SPACE AREAS AND LANDSCAPE AREAS | | | PROVIDED TO DEMONSTRATE COMPLIANCE WITH SECTIONS 94-443 | | | (C)(3) AND (4). PROVIDE THE CALCULATIONS IN A LANDSCAPE | | | REQUIREMENT CHART. | | | | | | 9. LOCATIONS OF SOME EXISTING UTILITIES ARE IN | | | QUESTION. ONCE FINALIZED ON PLANS, TREE CONFLICTS MUST | | | BE ADDRESSED. | | | | | | 10. 50% OPEN SPACE REQUIREMENT SQUARE FOOTAGE IS TO BE | | | CALCULATED BASED ON THE ENTIRE SITE SQUARE FOOTAGE. | | | | | | 11. CONSIDER SHIFTING TREES TO LOCATIONS TO ELIMINATE | | | THE USE OF ANY ROOT BARRIERS REQUIRED TO PROTECT | | | UTILITY LINES. THIS IS BETTER FOR THE TREES AND SAVES | | | ON COST. | | | | | | 12. COMPLETE THE FLORIDA FRIENDLY DESIGN OPTION LIST TO | | | PROVIDE THE REQUIRED 50 POINTS. | | | | | | 13. ARTIFICIAL TURF IS LIMITED TO THE LOCATIONS AS | | | LISTED IN SECTION 94-451. | | | | | | 14. SHOW LIGHTING LOCATIONS ON THE LANDSCAPE PLAN AND | | | RESOLVE CONFLICTS. | | | | | | 15. SHEET L2.11 LANDSCAPE SPECIFICATIONS IS BLANK. | | | | | | 16. PARKING AREA LOCATED ALONG THE NORTH PROPERTY LINE | | | LACKS THE REQUIRED TERMINAL ISLAND SHADE TREES AT THE | | | ENDS OF THE ROW OF 7 PARKING SPACES. SCREENING HEDGE IS | | | ALSO LACKING ALONG THE WESTERNMOST SPACE. | | | | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PU |
PUBLIC UTILITIES |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PU-CS |
PUBLIC UTILITIES CUSTOMER SRVC |
| Rev No |
2 |
Status |
F |
Date |
05-15-2023 |
|
|
Cont ID |
|
| Sent By |
mhurley |
Date |
05-15-2023 |
Time |
10:38 |
Rev Time |
0.00 |
| Received By |
mhurley |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2023-05-15 10:38:53 | PLEASE PROVIDE WRITTEN RESPONSE TO THE FOLLOWING: | | | -SHEET C6.04: ADD ADDRESSES TO THE PROPERTIES ON THE | | | WEST SIDE OF FLAGLER AS IT IS DIFFICULT TO DETERMINE | | | THE LOCATION. ALSO ADD THE CURRENT STREET NAMES. | | | -SHEET C6.04: THERE APPEARS TO BE A BACKFLOW ASSEMBLY | | | PROPOSED IN THE MIDDLE OF A SIDEWALK. ENSURE BACKFLOW | | | ASSEMBLY DOES NOT IMPEDE PEDESTRIAN TRAFFIC. | | | -SHEET C6.04: CLEARLY LABEL PROPERTY LINE. ALSO CANNOT | | | CLEARLY DISTINGUISH WHAT THE DASHED AND DOTTED LINES | | | JUST EAST OF THE BACKFLOW ASSEMBLY ARE ??? PLEASE | | | LABEL. | | | -SHEET C6.06: THERE APPEARS TO BE MULTIPLE RIGHT OF WAY | | | LINES. IS THAT AN ERROR, OR IS THE RIGHT OF WAY | | | BOUNDARIES CHANGING? | | | -SHEET C6.06: ON THE LABEL OF 3 INCH MASTER WATER | | | METER, ADD WORDING ABOVE-GROUND AND REFERENCE WATER | | | SERVICE STANDARD DETAIL WS3. THE RPPA CALLOUT SHOULD | | | ALSO HAVE SIZE AND REFERENCE WS7. | | | -SHEET C6.06: WPB UTILITIES RECOMMENDS DUAL/PARALLEL | | | BACKFLOW ASSEMBLIES ON IMPORTANT DOMESTIC WATER | | | SERVICES TO MINIMIZE WATER OUTAGES DURING BACKFLOW | | | MAINTENANCE AND TESTING. CONSIDER ADDING ANOTHER RPPA | | | FOR THE 3 INCH METER IF WATER OUTAGE WOULD BE | | | PROBLEMATIC. | | | -SHEET C6.06: WHY IS 3 INCH METER NOT PROPOSED IN 10 | | | FOOT UTILITY EASEMENT? | | | -SHEET C6.06: THERE SHOULD BE A CONTAINMENT FIRELINE | | | BACKFLOW ASSEMBLY FURTHER UPSTREAM OF THE FIRELINE | | | PIPING NEAR THE PROPERTY LINE, BUT SHOULD NOT BE IN AN | | | EASEMENT. IF ADDING ADDITIONAL DCDA, BE AWARE OF THE | | | ADDITIONAL PRESSURE REDUCTION. | | | -SHEET C6.06: ADDITION DOWNSTREAM ISOLATION BACKFLOW | | | ASSEMBLIES MAY BE REQUIRED. RECOMMEND VERIFYING AHEAD | | | OF TIME IF REQUIRED FOR PLUMBING. | | | -SHEET C6.010: ADD WPB WATER SERVICE STANDARD DETAILS | | | FOR LARGE DOMESTIC BACKFLOW ASSEMBLY, LARGE | | | ABOVE-GROUND METER, AND DOMESTIC SERVICE LOCATION. ADD | | | ADDITIONAL SHEET IF NEEDED. | | | RESPECTFULLY, | | | MARK HURLEY [email protected] |
|
|
| Review Stop |
PU-CS |
PUBLIC UTILITIES CUSTOMER SRVC |
| Rev No |
1 |
Status |
F |
Date |
09-23-2022 |
|
|
Cont ID |
|
| Sent By |
mhurley |
Date |
09-23-2022 |
Time |
13:40 |
Rev Time |
0.00 |
| Received By |
mhurley |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-09-23 13:40:10 | PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING. | | | -PRIOR REVIEW COMMENT: PROPOSED WATER METERS AND | | | BACKFLOW ASSEMBLIES NEED TO BE ADJACENT THE WESTERN | | | PROPERTY LINE AND NOT FAR ON INTERIOR OF PROPERTY. ANY | | | INTERIOR LOOPED SYSTEM WOULD BE PLUMBING AND CAN BE | | | MASTER METERED AS NEEDED. RESPONSE LETTER STATED NOTED, | | | BUT UTILITY PLANS SUCH AS SHEET C5.06 HAVE NOT BEEN | | | REVISED. THIS WOULD ALSO AFFECT FIRE SERVICES AND | | | HYDRANTS. IF NEED CLARIFICATION CAN CONTACT | | | [email protected]. | | | -C5.01: INVERTS SAY PVC BUT CALLOUT HAS VCP. | | | -C3.05 AND C3.09: LABEL ANY UTILITY EASEMENTS. | | | -C3.01: CALLOUT SAYS FORCEMAIN BUT SEEMS TO BE GRAVITY | | | SEWER. | | | -C3.01: THERE IS A STREETLIGHT IN DRIVEWAY EXIT. | | | -C3.01: IS A DO NOT ENTER SIGN NEEDED AT DRIVEWAY EXIT? | | | -C3.03: 10 FOOT CONCRETE SIDEWALK SEEMS TO ABRUPTLY | | | END. CANNOT TELL WHAT MATERIAL THE GRAY SHADED AREA IS. | | | PLEASE LABEL BETTER, ADD TO LEGEND, OR ADD REFERENCE TO | | | OTHER SHEET SHOWING MORE DETAIL. | | | -C3.03: IS A BUILDING STRUCTURE PROPOSED OVER SANITARY | | | SEWER MAIN? | | | -C3.03: SHOULD FORCEMAIN CALLOUTS BE GRAVITY INSTEAD? | | | -C3.03: SHOWS SOME WATER MAINS, BUT THOUGHT THEY WERE | | | BEING REMOVED. | | | -PLEASE SHOW MORE CLEARLY ON DEMO PLANS THE LIMITS OF | | | THE WATER MAIN REMOVAL. | | | -C3.04: THERE IS A STORM STRUCTURE IN A SEATWALL. | | | -C3.05: FORCE MAIN SHOWING GOING INTO WATERWAY. PLEASE | | | VERIFY IF THAT IS CORRECT. | | | -C3.05: THERE ARE SOME LIGHTS IN CLOSE PROXIMITY TO | | | WATER AND SEWER MAINS. PLEASE MAKE SURE ANY PROPOSED | | | LIGHT POLES ARE AT LEAST 5 HORIZONTAL FEET AWAY FROM | | | WATER AND SEWER MAINS. | | | -C3.06: TENNIS COURT IS ENCROACHING INTO UTILITY | | | EASEMENT. | | | -C5.02: CALLOUT UTILITY EASEMENTS. | | | -C5.01 AND C5.03: UTILITIES ARE NOT SHOWN IN THE GREY | | | AREA. WHY? | | | -C5.04: CANNOT INSTALL A BACKFLOW ASSEMBLY IN A | | | SIDEWALK. | | | -C5.04: RPPA LEADER LINE IS POINTED TO VALVE SYMBOL. | | | PLEASE UPDATE. | | | -SHOW METER BOXES ON UTILITY PLANS AND MAKE SURE METER | | | SIZE IS LABELED. | | | -C5.05: WHAT TYPE OF 20 FOOT EASEMENT IS RUNNING ACROSS | | | THE WATERWAY? | | | -CITY SEWER LATERALS ARE TYPICALLY MINIMUM 6 INCH SIZE. | | | -C5.07: SANITARY DRAIN SEEMS TO BE LOCATED IN A | | | DUMPSTER AREA. THIS IS NOT BE ALLOWED IF STORMWATER | | | WOULD GO INTO IT, AND MAY ALSO NOT BE ALLOWED | | | OTHERWISE. | | | -ON LANDSCAPING PLANS SUCH AS L3.02, PLEASE LABEL | | | STREETS AND SIDE STREETS. | | | -WILL ANY AUXILIARY WATER SUPPLIES BE CONNECTED TO | | | PRIVATE FIRE SYSTEMS? | | | RESPECTFULLY, | | | MARK HURLEY [email protected] |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
3 |
Status |
P |
Date |
06-01-2023 |
|
|
Cont ID |
|
| Sent By |
|
Date |
06-01-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
06-01-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-06-01 18:18:42 | CONDITION OF APPROVAL: | | | | | | THE TRASH RECEPTACLES SHALL HAVE RAIN BONNET LID TO | | | KEEP THE RAIN OUT. | | | | | | DEPT. OF PUBLIC WORKS | | | MATT HEJAZI | | | [email protected] | | | 561-822-2045 |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
2 |
Status |
P |
Date |
09-19-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
09-19-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
09-19-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-09-19 11:44:33 | NO FURTHER COMMENTS. | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
F |
Date |
11-17-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
11-17-2021 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
11-17-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-11-17 14:24:01 | | | | | | | PLEASE PROVIDE THE FOLLOWINGS: | | | 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID | | | WASTE VOLUME PRODUCED ALONG WITH THE SIZE, TYPE AND | | | QUANTITY OF THE CONTAINER (I.E. DUMPSTER/COMPACTOR) | | | THAT WILL BE UTILIZED THAT WILL BE UTILIZED FOR THE | | | SANITATION SERVICE. | | | 2- DUMPSTER ENCLOSURE DETAIL. FOR A FREESTANDING SITE | | | DUMPSTER ENCLOSURE, THE ENCLOSURE SHALL COMPLY WITH THE | | | LATEST REVISION OF CITY OF WEST PALM BEACH GENERAL | | | CONSTRUCTION-GARBAGE ENCLOSURE STANDARD, GC-7. | | | 3- DETAILS FOR SANITATION SERVICE (I.E. SOLID WASTE | | | CONTAINER(S) TYPE, COLLECTION LOCATION, ETC.). | | | 4- AUTOTURN EXHIBIT (DYNAMIC ENVELOPE AND THE VEHICLE?S | | | WHEEL PATH) FOR THE SANITATION SERVICE, FRONT LOADER | | | TRUCK WITH THE FOLLOWING SPECS: | | | - DUAL AXLES | | | - TRUCK LENGTH: 35 FT | | | - TRUCK WIDTH: 11 FT | | | - TURNING RADIUS: | | | - SAE TURNING RADIUS: 32.5 FT | | | - CURB-TO-CURB DIAMETER: 74 FT | | | - WALL-TO-WALL DIAMETER: 86.3 FT | | | | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
3 |
Status |
F |
Date |
07-31-2023 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
07-31-2023 |
Time |
11:59 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
07-31-2023 |
Time |
12:21 |
Sent To |
|
|
| Notes |
| 2023-07-31 12:03:08 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 5/11/2023 SUBMITTAL. | | | | | | 1. VERIFY THE CONSTANT TO CONVERT ELEVATIONS FROM | | | NAVD1988 TO NGVD1929. DIFFERENT CONSTANTS ARE LISTED ON | | | THE CIVIL PLANS. | | | | | | 2. CALLOUT ON SHEET C2.03 IF THE WATER MAIN NEAR THE | | | SEAWALL IS TO BE REMOVED OR IS TO REMAIN. | | | | | | 3. ON DEMO PLANS NOTE WHETHER EACH EXISTING UTILITY | | | LINE IS TO BE REMOVED, TO BE ABANDONED OR IS TO REMAIN. | | | USING CROSS-HATCHING FOR THE UTILITIES TO BE REMOVED | | | WILL MAKE THE INFORMATION MORE DISTINCT. | | | | | | 4. LABEL ALL UNDERGROUND STORAGE TANKS (FOR STORMWATER) | | | ON THE SITE PLAN SHEETS. | | | | | | 5. BRING UTILITY LINE WORK TO THE TOP LAYER SO THE | | | LINES DO NOT DISAPPEAR BEHIND SOLID OR OTHER HATCHING | | | PATTERNS. | | | | | | 6. INCLUDE PRB'S IN THE FIRST INLETS UPSTREAM AND | | | DOWNSTREAM OF ALL EXFILTRATION TRENCHES. ADJUST | | | STRUCTURE SUMP ELEVATIONS FOR INLETS THAT WILL HAVE | | | PRB???S. | | | | | | 7. CONFIRM THERE WILL BE SUFFICIENT COVER DEPTH OVER | | | THE PROPOSED STORM PIPES. INDICATE WHAT THE MINIMUM | | | COVER DEPTH SHOULD BE IN THE RESPONSE TO THIS COMMENT. | | | | | | 8. PROVIDE HIGH POINT SPOT GRADES AT ALL DRIVEWAYS. | | | LOCATE THESE HIGH POINTS AS CLOSE TO THE ROAD OR BACK | | | OF SIDEWALK AS POSSIBLE TO MINIMIZE THE AMOUNT OF AREA | | | CONTRIBUTING STORMWATER RUNOFF TO THE ROAD. | | | | | | 9. EXISTING INLET ON 36-IN STORM PIPE NORTH OF PROPOSED | | | CATCH BASIN #6 MAY NEED TO BE REPLACED IF THE PROPOSED | | | 24-IN STORM PIPE IS TOO BIG FOR THE SOUTH SIDE OF THE | | | STRUCTURE. | | | | | | 10. THE PROPOSED WEIR ELEVATION (5.20) AT THE EXISTING | | | INLET NORTH OF THE PROPOSED CATCH BASIN #6 IS HIGHER | | | THAN THE RIM ELEVATIONS OF THE EXISTING INLET AND CATCH | | | BASIN #6. | | | | | | 11. LABELS OVERLAP ON PGD PLANS AROUND PROPOSED | | | STRUCTURES #5 AND #18. | | | | | | 12. PROVIDE OUTSIDE TOP AND BOTTOM ELEVATIONS FOR THE | | | PROPOSED STORM PIPES AND EXISTING UTILITIES THAT ARE | | | CROSSED AND THE VERTICAL CLEARANCE BETWEEN THE TWO | | | PIPES. | | | | | | 13. RECOMMEND MINIMUM 15-IN DIAMETER PIPE FOR STORM | | | DRAINAGE SYSTEMS. | | | | | | 14. REPLACE THE EXISTING STORM OUTFALL PIPE FROM LAKE | | | WORTH LAGOON TO THE PROPOSED END OF THE PIPE AS SHOWN | | | ON THE 26TH ST STORMWATER AND ITILITY IMPROVEMENT | | | PLANS. (REPEAT COMMENT) | | | 15. WHERE DID THE WEST CURB LINE FOR N. FLAGLER DR | | | SHOWN ON SHEET C4.06 COME FROM? THE EXISTING INLETS ARE | | | SHOWN BEHIND THE EAST CURB. | | | | | | 16. PROVIDE A GRADING PLAN (CONTOURS) OR CROSS SECTION | | | FOR THE AREA SOUTH OF THE BOAT RAMP. UP TO 2.5 FEET OF | | | FILL IS BEING ADDED FOR THE PATHWAY AROUND THE PUBLIC | | | DINING AREA. | | | | | | 17. LABEL EXISTING STORM PIPES (SIZE AND MATERIAL) ON | | | THE PGD PLANS. | | | | | | 18. STRUCTURE 19 MAY NEED A WEIR. | | | | | | 19. CAN THE PIPE(S) DRAINING STRUCTURE 46 BE LOCATED | | | EAST AND SOUTH OF THE LIFT STATION INSTEAD OF NORTH OF | | | THE LIFT STATION. THERE ARE SEVERAL SANITARY LINES | | | NORTH OF THE LIFT STATION. | | | | | | 20. CONFIRM WITH THE BUILDING DEPT. WHETHER AN ADA SAFE | | | PATH IS NEEDED TO GET TO AND FROM THE HANDICAP PARKING | | | SPACES NORTH OF THE PROPOSED TENNIS COURTS. SIDEWALK | | | CONNECTIONS BETWEEN THE HANDICAP ACCESS AISLES AND THE | | | SIDEWALK WEST OF THE HANDICAP PARKING SPACES MAY BE | | | NEEDED. | | | | | | 21. SHEET C5.09: TWO -WAY TRAFFIC APPROACHING ONE-WAY | | | DRIVE AISLE. SIGNAGE AND PAVEMENT MARKINGS MAY BE | | | NEEDED TO DIRECT THE EB 2-WAY TRAFFIC. | | | | | | 22. STOP BARS SHOULD BE PERPENDICULAR TO THE TRAVEL | | | LANE. | | | | | | 23. PARKING SPACE STRIPING DETAIL SHOULD BE IN | | | ACCORDANCE WITH SECTION 94-485 OF THE CITY'S ZONING AND | | | LAND DEVELOPMENT CODE. | | | | | | 24. CONFIRM 8' 4" DIMENSION (VS. 8' 6") FOR THE | | | ON-STREET PARKING NORTH OF THE DRIVEWAY ON SHEET C3.01. | | | | | | 25. FOR ENGINEERING PERMIT SUBMITTAL: | | | A. PROVIDE TOP OF TRENCH AND BOTTOM OF TRENCH | | | ELEVATIONS ON THE EXFILTRATION TRENCH DETAIL. | | | B. PROVIDE DETAILS OF THE STORMWATER UNDERGROUND | | | STORAGE STRUCTURES. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | [email protected] | | | | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
11-18-2021 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
11-18-2021 |
Time |
12:45 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
11-18-2021 |
Time |
12:46 |
Sent To |
|
|
| Notes |
| 2021-11-18 12:46:48 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. SITE IS WITHIN A SPECIAL FLOOD HAZARD AREA (SFHA) | | | WITH BASE FLOOD ELEVATIONS (BFES) OF 6 FT NAVD AND 7 FT | | | NAVD. PRELIMINARY COASTAL FLOOD MAPS MAY SHOW HIGHER | | | BASE FLOOD ELEVATIONS. STRUCTURES WITHIN SFHA SHALL | | | HAVE MINIMUM 2 FEET OF FREEBOARD ABOVE THE BFE. | | | | | | 2. THE CITY?S OFFICIAL VERTICAL DATUM PER CITY CODE IS | | | NGVD1929. THE CITY IS ALLOWING SURVEYS AND PLANS TO USE | | | NAVD1988 PROVIDED THE CONVERSION EQUATION BETWEEN | | | NAVD1988 AND NGVD1929 IS ALSO PROVIDED. THE SURVEY AND | | | THE CIVIL PLANS USE DIFFERENT CONVERSION FACTORS | | | BETWEEN THE VERTICAL DATUMS NAVD1988 AND NGVD1929. | | | | | | 3. SUGGEST RESERVING SHEET NUMBERS ENDING WITH .00 FOR | | | OVERALL PLAN VIEWS. | | | | | | 4. SHOWING ALL EXISTING WATER, SEWER AND DRAINAGE | | | SYSTEMS WITHIN THE PARK. THERE IS AN EXISTING FM NEAR | | | N. FLAGLER DRIVE THAT IS NOT SHOWN. THERE ARE OFFSITE | | | DRAINAGE SYSTEMS THAT FLOW THROUGH THE PARK. SHOW THE | | | FORCEMAIN FROM THE LIFT STATION AT THE NORTH END OF THE | | | PARK. | | | | | | 5. EXISTING SANITARY SEWER MAIN IS MISLABELED AS A | | | FORCE MAIN. | | | | | | 6. LABEL THE STREETS ON ALL OF THE PLAN SHEETS. | | | | | | 7. PROVIDE INFORMATION FOR N. FLAGLER DRIVE / BUTLER | | | STREET INTERSECTION. | | | | | | 8. C1.XX STORMWATER POLLUTION PREVENTION PLAN SHEETS | | | A. SHOW FLOATING TURBIDITY BARRIERS AROUND THE OUTFALL | | | PIPES TO LAKE WORTH LAGOON AND AROUND ANY CONSTRUCTION | | | WITHIN THE LAKE WORTH LAGOON. | | | B. SHOW INLET PROTECTION FOR DRAINAGE STRUCTURES ON N. | | | FLAGLER DRIVE INCLUDING FIRST INLET NORTH OF THE NEW | | | DRIVEWAY TO 26TH STREET. | | | | | | 9. C2.XX DEMOLITION PLAN SHEETS | | | A. IDENTIFY WHAT IS TO HAPPEN TO THE STORM SEWER | | | SYSTEMS | | | B. ADD NOTE TO PLANS THAT THE FORCEMAIN ALONG THE | | | EXTENSION OF 23RD STREET IS TO REMAIN. | | | C. ADD NOTE TO PLANS THAT THE LIFT STATION FORCEMAIN | | | AND THE TWO GRAVITY SEWER SYSTEMS ALONG THE EXTENSION | | | OF 26TH STREET ARE TO REMAIN. | | | D. INCLUDE DEMOLITION NOTES, EXISTING CONDITIONS NOTES | | | AND DEMOLITION SCHEDULE ON ALL SHEETS. | | | | | | 5. C5.XX PGD PLAN SHEETS | | | A. NUMBER DRAINAGE STRUCTURES FOR EASE OF REFERENCE. | | | B. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP | | | REQUIREMENTS. | | | C. DRAINAGE SYSTEM DESIGN TO CONSIDER SEA LEVEL RISE. | | | D. HOW WILL ROCK RIPRAP REVETMENT AFFECT EXISTING | | | DRAINAGE OUTFALLS? | | | E. REPLACE ENDS OF OUTFALL PIPES WHERE THE SEAWALL IS | | | BEING REPLACED. NEW PIPE SHOULD EXTEND BEYOND TIE BACK | | | AREA OF SEAWALL. MANATEE GRATES MAY BE REQUIRED. | | | F. REPLACE STORM PIPE FROM SEAWALL TO LIMITS OF WHERE | | | THE PIPE IS REPLACED BY THE 26TH STREET UTILITY AND | | | ROADWAY PROJECT. | | | G. CHECK MATCHLINE SHEET REFERENCES. | | | H. HOW IS THE RUNOFF FROM THE PARKING LOT ON SHEET | | | C5.01 TREATED/MANAGED? | | | I. AVOID PUTTING MANHOLES WITHIN PAVED WALKING AREAS. | | | J. PROVIDE ADDITIONAL HORIZONTAL SEPARATION BETWEEN | | | PROPOSED STORM AND EXISTING SANITARY SEWER. | | | K. LABEL ELEVATIONS OF ALL CONTOUR LINES ON EVERY | | | SHEET. | | | L. WILL PROPOSED EXFILTRATION TRENCHES ALONG SEAWALL | | | INTERFERED WITH THE SEAWALL ANCHOR SYSTEM? | | | M. UTILITY SYMBOLS ON SHEET C5.08 APPEAR TO BE | | | DUPLICATED AND NOT ALIGNED. FOR EXAMPLE THERE ARE | | | MULTIPLE MANHOLE SYMBOLS IN OR NEAR THE DRIVEWAY TO | | | 26TH ST. | | | N. THE CB SHOWN IN THE DRIVE FOR 26TH STREET DOES NOT | | | SHOW UP ON THE SURVEY. IS THIS A NEW STRUCTURE? SUGGEST | | | PUTTING THE STRUCTURE IN A DIFFERENT LOCATION AND | | | CONNECTING TO PROPOSED DRAINAGE SYSTEM TO THE SOUTH. | | | O. EXISTING CB OVER EXISTING 60? RCP ON SHEET C5.09 IS | | | SHOWN AS MANHOLE ON THE SURVEY. NOTE ON THE SHEET | | | INDICATES CATCH BASIN BY OTHERS. WHO IS ?BY OTHERS?? | | | SUGGEST LEAVING MANHOLE TOP AND INSTALLING A SEPARATE | | | CATCH BASIN WITH PRB TO PREVENT FLOATABLES FROM LEAVING | | | THE SITE. PERHAPS MOVE THE WEIR CONTROL TO THIS | | | STRUCTURE. | | | P. SHOW IMPROVEMENTS WITHIN LAKE WORTH LAGOON AND REFER | | | TO OTHER SHEETS FOR DESIGN INFORMATION. | | | Q. LABEL THE CYAN SQUIGGLY LINES ON THE SHEETS. | | | R. PROVIDE CROSS SECTIONS OF EACH DRIVEWAY TO N. | | | FLAGLER DRIVE. | | | S. HOW IS THE FITNESS LAWN AREA GRADED. THE CONTOUR | | | LINES STOP OF THE PERIMETER OF THE LAWN. | | | T. FIVE FEET OF FILL PROPOSED IN SOME AREAS OVER THE | | | EXISTING SANITARY SEWER PIPE. WHAT IS THE CONDITION OF | | | THE SEWER PIPE AND WILL IT NEED TO BE REPLACED/LINED | | | PRIOR TO CONSTRUCTION? | | | U. BETHESDA TERRACE IMPROVEMENTS INCLUDED WITH THIS | | | PROJECT? DRAINAGE STRUCTURES NOT CORRECTLY SHOWN. | | | V. ADD HERRINGBONE HATCH PATTERN TO LEGEND. | | | W. CONSIDER LOW IMPACT DEVELOPMENT WATER QUALITY | | | TREATMENT DESIGN INSTEAD OF OR IN ADDITION TO | | | EXFILTRATION TRENCHES. | | | X. INCLUDE CITY DETAILS FOR PRB?S AND DRIVEWAYS. | | | | | | 6. SHOW AND LABEL CONTOURS ON THE UTILITY PLAN SHEETS. | | | | | | 7. INCORPORATE THE CITY?S 26TH STREET UTILITY AND | | | ROADWAY IMPROVEMENT PROJECT DESIGN. | | | | | | 8. AVOID PLANTING TREES OVER OR NEAR UTILITY LINES AND | | | EXFILTRATION TRENCHES. | | | | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. PROVIDE COPY OF SFWMD ERP PERMIT BEFORE START OF | | | CONSTRUCTION. | | | | | | 2. PROVIDE A COPY OF THE DRAINAGE CALCULATIONS WITH THE | | | ENGINEERING PERMIT APPLICATION. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
3 |
Status |
P |
Date |
06-27-2023 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
06-27-2023 |
Time |
06:55 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2023-06-27 06:59:55 | PREVIOUS COMMENTS HAVE BEEN ADDRESSED. PLEASE NOTE THAT | | | A UTILITY STUDY HAS BEEN COMPLETED FOR THE CMUD /LS 23 | | | AREA AND THE 12" SANITARY SEWER THRU THE PARK IS TO BE | | | ABANDONED. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
F |
Date |
09-22-2022 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
09-22-2022 |
Time |
13:47 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-09-22 13:49:48 | 1. PREVIOUS COMMENTS 1-6 "NOT YET PROVIDED" WAITING ON | | | SUPPLEMENTAL PACKAGE. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
11-09-2021 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
11-09-2021 |
Time |
10:01 |
Rev Time |
|
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-11-09 12:09:41 | 1. SURVEY NEEDS TO BE BASED ON A TITLE SEARCH. | | | 2. FORCE MAIN ALONG FLAGLER NEEDS TO BE SHOWN TOGETHER | | | WITH ITS PROPOSED EASEMENT AND THE PROPOSED EASEMENT | | | FOR THE EXISTING EAST-WEST FORCE MAIN. | | | 3. NOT ALL PROPERTY CORNERS ARE SHOWN AS FOUND OR SET. | | | 4. LABEL EAST AND WEST LIMITS OF ORB 803/137 ON ALL | | | SHEETS. | | | 5. NEED CCTV OF EXISTING N-S SANITARY LINE. | | | 6. SHOW PROPOSED NORTHWOOD ROAD EXTENSION. | | | 7. IT APPEARS THAT LANDSCAPING WILL CONFLICT WITH THE | | | EXISTING SANITARY AND FORCE MAIN. NEED 10' CLEARANCE. | | | 8. PROPERTY WILL BE REQUIRED TO BE RE-PLATTED. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
3 |
Status |
F |
Date |
06-22-2023 |
|
|
Cont ID |
|
| Sent By |
|
Date |
06-22-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
06-22-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-06-22 02:40:52 | TRAFFIC COMMENTS | | | 1) SATISFIED. PROVIDE COUNTY TPS LETTER | | | 2) PARTIALLY SATISFIED. A COMPREHENSIVE TRAFFIC STUDY | | | WILL BE REQUIRED. PLEASE SCHEDULE A METHODOLOGY MEETING | | | WITH THE TRAFFIC ENGINEERING GROUP, PRIOR TO REVISING | | | OR RESUBMITTING THE TRAFFIC STUDY. PLEASE ADDRESS | | | 3) NOT SATISFIED. IN THE TRIP GENERATION TABLE ADD THE | | | CAF?? PAVILION AS A TRIP GENERATOR. EMAIL EXCHANGE DID | | | NOT WAVE THIS ITEM | | | 4) NOT SATISFIED. PROVIDE A FIGURE SHOWCASING | | | DRIVEWAY(S) VOLUMES AND DIRECTIONAL SPLIT, BOTH INBOUND | | | AND OUTBOUND. EMAIL EXCHANGE DID NOT WAVE THIS ITEM | | | 5) SATISFIED. PROVIDE EXISTING WEEKEND TRAFFIC COUNTS. | | | 6) SATISFIED. PROVIDE PROPOSED DEVELOPMENT SITE PLAN IN | | | THE TRAFFIC STUDY | | | 7) NOT SATISFIED. A DETAILED INTERNAL CIRCULATION | | | ANALYSIS SHOULD BE PROVIDED IN THE TRAFFIC STUDY OR AS | | | A SEPARATE DOCUMENT | | | SITE COMMENTS | | | 8) NOT SATISFIED. PROVIDE A CLEAN SITE PLAN, SHOWCASING | | | ONLY TRANSPORTATION FEATURES (I.E. ROAD, CURB, GUTTER, | | | SIDEWALK, DRIVEWAY, PAVEMENT MARKING, SIGNAGE, PATHWAY, | | | WALKWAY, PEDESTRIAN CROSSING, LOADING ZONE, | | | PICK-UP/DROP-OFF AREA) AND CORRESPONDING DIMENSIONS. A | | | SPECIFIC AND SEPARATE SITE PLAN SHEET SHOULD BE | | | PROVIDED TO FULFILL THIS COMMENT, AS SEVERAL DIMENSIONS | | | ARE MISSING FOR KEY TRANSPORTATION ITEMS. PAVEMENT | | | MARKINGS AND DIMENSIONS SHOULD BE PROVIDED FOR ALL | | | TRAVEL LANES; THE LATEST PAVEMENT MARKINGS AND SIGNAGE | | | PLANS ARE DEFICIENT. | | | 9) SATISFIED. PROVIDE TYPICAL PARKING STALL DIMENSIONS | | | AND TYPOLOGY (I.E. NORMAL, COMPACT, TRAILER). MARK OR | | | PROPERLY LABEL EACH OF THEM ON THE SITE PLAN | | | 10) PARTIALLY SATISFIED. ON THE SITE PLAN, PLEASE | | | SHOWCASE BASIC CURB DETAILS (I.E. DRIVEWAY AND PARKING | | | STALLS IF ANY) ON THE OPPOSITE SIDE OF THE ROADS | | | SURROUNDING THE PROPOSED DEVELOPMENT. PARKING STALL | | | MARKINGS ARE MISSING. PLEASE INCLUDE THEM IN THE | | | PAVEMENT MARKING AND SIGNAGE PLANS | | | 11) SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE | | | TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND OUT OF THE | | | PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES | | | CLEARLY DEFINED. ALSO PROVIDE ANALYSIS FOR TYPICAL | | | TRUCK WITH BOAT TRAILER. INSERT DESIGN VEHICLES DETAILS | | | IN THE DRAWING. PLEASE PROVIDE DOCUMENT NAME AND SHEET | | | NUMBER SHOWCASING THE ANALYSIS. LATEST ANALYSIS IS NOT | | | PROPER, ENGINEERING SERVICES CAN PROVIDE A SAMPLE | | | ANALYSIS FOR REFERENCE PURPOSES | | | 12) SATISFIED. IDENTIFY AND DESIGNATE AN EASILY | | | ACCESSIBLE MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20 | | | FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS. FOR | | | THE LATTER ITEM, MORE SPECIFICALLY: A CONDUIT (2??? | | | SCHEDULE 40 PVC) TO THE POWER SOURCE WITH AN ELECTRICAL | | | PULL BOX (240V CIRCUIT). | | | 13) SATISFIED. PROVIDE PARKING TABLE SHOWCASING THE | | | NUMBER OF DESIGNATED PARKING SPACES, INCLUSIVE OF ADA, | | | SPECIALTY OR RESTRICTED SUCH AS TRAILERS, AND BICYCLE | | | ONES. PLEASE PROVIDE DOCUMENT NAME AND SHEET NUMBER | | | SHOWCASING SUCH TABLE | | | 14) PARTIALLY SATISFIED. PROVIDE AND INDICATE FREIGHT | | | DELIVERY LOADING ZONE. PROVIDE DIMENSIONS IN THE | | | TRANSPORTATION SPECIFIC SITE PLAN. NOTE: THE DESIGNATED | | | AREA SHOULD BE STRICTLY FOR COMMERCIAL VEHICLES AND | | | SHOULD BE MARKED AND SIGNED ACCORDINGLY | | | 15) SATISFIED. PROVIDE A SIDEWALK WITH 10 FEET MINIMUM | | | WIDTH ALONG SITE FRONTAGE. IMPLEMENTATION OF A MULTIUSE | | | PATHWAY, WITH DISTINCT BICYCLE LANES IS STRONGLY | | | ENCOURAGED, MINIMUM WIDTH SHOULD BE 15-FEET | | | 16) SATISFIED. ARE THERE ANY DESIGNATED | | | PICK-UP/DROP-OFF OR VALET AREAS? IF SO CLEARLY INDICATE | | | THEM ON THE SITE PLAN. COMMENT IS REFERRING TO | | | PASSENGER PICK-UP/DROP-OFF OPERATIONS, NOT COMMERCIAL | | | LOADING/UNLOADING. IN CASE OF THE FORMER, A VALET | | | OPERATIONAL ANALYSIS SHOULD BE PROVIDED | | | 17) SATISFIED. THERE IS A CONCEPT TO EXTEND NORTHWOOD | | | RD TO FLAGLER, AND POTENTIALLY INSTALL A ROUNDABOUT IN | | | LIEU OF AN INTERSECTION. PLEASE COORDINATE WITH | | | PLANNING AND CRA ON THIS ITEM, AS IT MAY AFFECT THE | | | LAYOUT OF THE PARKING AREA AND THE ALIGNMENT OF THE | | | DRIVEWAYS. | | | 18) NOT SATISFIED. PROVIDE A PAVEMENT MARKING AND | | | SIGNAGE PLAN. THIS SHOULD BE A SEPARATE SITE PLAN SHEET | | | OR INCLUDED IN THE TRANSPORTATION SPECIFIC SITE PLAN. | | | LATEST PLANS ARE MISSING SEVERAL MARKINGS AND | | | DIMENSIONS | | | 19) NOT SATISFIED. PROVIDE A SEPARATED AND PROTECTED | | | TWO-WAY BIKE LANE ALONG THE EASTERN SIDE OF FLAGLER DR | | | ACCORDING TO THE CITY BICYCLE MASTERPLAN. THIS IS A | | | MAJOR ITEM, PLEASE CONTACT ENGINEERING SERVICES FOR | | | FURTHER DISCUSSION OR CLARIFICATIONS. DUE TO FULL | | | REDEVELOPMENT OF THE PARK, THERE ARE NO REASONS THAT | | | PRECLUDE ESTABLISHING A 14-FEET WIDE SHARED USE PATHWAY | | | THROUGHOUT. PER FDOT SHARED USE PATHWAY GUIDELINES | | | SECTION 224.7: PROVIDE A 4-FOOT CLEAR AREA ADJACENT TO | | | BOTH SIDES OF THE PATH, INCLUDING PLACEMENT OF SIGNS. | | | FOR RESTRICTED CONDITIONS, BRIDGE ABUTMENTS, SIGNPOSTS, | | | FENCING AND RAILING MAY BE LOCATED WITHIN 4 FEET OF THE | | | EDGE OF PAVEMENT, BUT NOT LESS THAN 2 FEET. PLEASE | | | REVISE ACCORDINGLY | | | 20) SHEET C5.00. BASED ON THE PROPOSED DRIVE AISLES, | | | SIGNAGE AND PAVEMENT MARKINGS, THE OVERALL INTERNAL | | | CIRCULATION ESPECIALLY NEARBY THE BOAT LAUNCH AREA DOES | | | NOT SEEM OPTIMAL NOR CONDUCIVE TO SAFE OPERATIONS. | | | GENERAL VEHICULAR TRAFFIC IS MIXED WITH THE | | | BOAT-TRAILING ONE. IT IS STRONGLY RECOMMENDED TO | | | REDESIGN THE PARKING LOT LAYOUT AND VALIDATE ITS | | | CONFIGURATION WITH A PROPER INTERNAL CIRCULATION | | | ANALYSIS | | | 21) SHEET C5.01. SEVERAL PAVEMENT MARKINGS AND | | | DIMENSIONS ARE MISSING, PROVIDE A 14-FEET WIDE MULTIUSE | | | PATHWAY. THE INTERSECTION OF BUTLER AND FLAGLER MUST BE | | | PROPERLY AND ENTIRELY DEPICTED, INCLUSIVE OF ALL | | | PERTINENT TRANSPORTATION FEATURES; THAT IS NECESSARY TO | | | VALIDATE THE PROPOSED SOUTHERN DRIVEWAY LOCATION AND | | | CONFIGURATION | | | 22) SHEET C5.02. SEVERAL PAVEMENT MARKINGS AND | | | DIMENSIONS FOR KEY TRANSPORTATION ITEMS (I.E. TRAVEL | | | LANES, OPPOSITE SIDE MARKINGS) ARE MISSING | | | 23) SHEET C.5.03. PROVIDE A CONTINUOUS 14-FEET SHARED | | | USE PATHWAY | | | 24) SHEET C5.04. TRANSPORTATION FEATURES SUCH AS RAMPS | | | AND CROSSWALKS FOR THE INTERSECTION OF 23RD AND FLAGLER | | | ARE EITHER MISSING OR GROSSLY DEPICTED. SEVERAL OTHER | | | MARKINGS AND DIMENSIONS ARE MISSING | | | 25) SHEET C5.06. DRAFT ROADWAY CONFIGURATIONS FOR THE | | | PLANNED NORTHWOOD ROAD EXTENSION SHOULD BE AVAILABLE | | | FOR INTEGRATION AND PROPER CONFIGURATION OF THE | | | PROPOSED DRIVEWAY; PLEASE REVISE ACCORDINGLY. SEVERAL | | | DIMENSIONS ARE MISSING (I.E. TRAVEL LANES, DRIVE | | | AISLES). THE CROSSWALK BY THE INTERNAL DRIVE AISLE | | | SHOULD BE BETTER DEPICTED AND CONFIGURED AS A RAISED | | | ONE. UNDERGROUND UTILITY LINES ARE NOT PERTINENT, | | | PLEASE DO NOT SHOW THAT LAYER | | | 26) SHEET C5.08. PROPERLY RE-ALIGN THE DRIVEWAY | | | CROSSWALK, SEVERAL PAVEMENT MARKINGS AND DIMENSIONS | | | MISSING | | | 27) SHEET C5.09. A FEW DIMENSIONS MISSING. INSTALL | | | DO-NOT-ENTER AND/OR DIRECTIONAL ARROW SIGNAGE AT THE | | | INTERNAL INTERSECTION ALONG THE NORTHERN ONE-WAY DRIVE | | | AISLE | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
2 |
Status |
F |
Date |
09-23-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
09-23-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
09-23-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-09-27 08:54:26 | Z21100018 - CURRIE PARK - R1- 2022-09-22 | | | | | | TRAFFIC COMMENTS | | | | | | 1) NOT SATISFIED. PROVIDE COUNTY TPS LETTER | | | | | | 2) NOT SATISFIED. A COMPREHENSIVE TRAFFIC STUDY WILL BE | | | REQUIRED. PLEASE SCHEDULE A METHODOLOGY MEETING WITH | | | THE TRAFFIC ENGINEERING GROUP, PRIOR TO REVISING OR | | | RESUBMITTING THE TRAFFIC STUDY | | | | | | 3) NOT SATISFIED. IN THE TRIP GENERATION TABLE ADD THE | | | CAF?? PAVILION AS A TRIP GENERATOR | | | | | | 4) NOT SATISFIED. PROVIDE A FIGURE SHOWCASING | | | DRIVEWAY(S) VOLUMES AND DIRECTIONAL SPLIT, BOTH INBOUND | | | AND OUTBOUND | | | | | | 5) NOT SATISFIED. PROVIDE EXISTING WEEKEND TRAFFIC | | | COUNTS | | | | | | 6) NOT SATISFIED. PROVIDE PROPOSED DEVELOPMENT SITE | | | PLAN IN THE TRAFFIC STUDY | | | | | | 7) A DETAILED INTERNAL CIRCULATION ANALYSIS SHOULD BE | | | PROVIDED IN THE TRAFFIC STUDY | | | | | | | | | | | | SITE COMMENTS | | | | | | 8) NOT SATISFIED. PROVIDE A CLEAN SITE PLAN, SHOWCASING | | | ONLY TRANSPORTATION FEATURES (I.E. ROAD, CURB, GUTTER, | | | SIDEWALK, DRIVEWAY, PAVEMENT MARKING, SIGNAGE, PATHWAY, | | | WALKWAY, PEDESTRIAN CROSSING, LOADING ZONE, | | | PICK-UP/DROP-OFF AREA) AND CORRESPONDING DIMENSIONS. A | | | SPECIFIC AND SEPARATE SITE PLAN SHEET SHOULD BE | | | PROVIDED TO FULFILL THIS COMMENT | | | | | | 9) SATISFIED. PROVIDE TYPICAL PARKING STALL DIMENSIONS | | | AND TYPOLOGY (I.E. NORMAL, COMPACT, TRAILER). MARK OR | | | PROPERLY LABEL EACH OF THEM ON THE SITE PLAN | | | | | | 10) PARTIALLY SATISFIED. ON THE SITE PLAN, PLEASE | | | SHOWCASE BASIC CURB DETAILS (I.E. DRIVEWAY AND PARKING | | | STALLS IF ANY) ON THE OPPOSITE SIDE OF THE ROADS | | | SURROUNDING THE PROPOSED DEVELOPMENT. PARKING STALL | | | MARKINGS ARE MISSING. PLEASE INCLUDE THEM IN THE | | | PAVEMENT MARKING AND SIGNAGE PLAN. | | | | | | 11) NOT SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR | | | GARBAGE TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND | | | OUT OF THE PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC | | | ENVELOPES CLEARLY DEFINED. ALSO PROVIDE ANALYSIS FOR | | | TYPICAL TRUCK WITH BOAT TRAILER. INSERT DESIGN VEHICLES | | | DETAILS IN THE DRAWING. PLEASE PROVIDE DOCUMENT NAME | | | AND SHEET NUMBER SHOWCASING THE ANALYSIS. LATEST | | | ANALYSIS IS NOT PROPER, ENGINEERING SERVICES CAN | | | PROVIDE A SAMPLE ANALYSIS FOR REFERENCE PURPOSES | | | | | | 12) SATISFIED. IDENTIFY AND DESIGNATE AN EASILY | | | ACCESSIBLE MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20 | | | FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS. FOR | | | THE LATTER ITEM, MORE SPECIFICALLY: A CONDUIT (2??? | | | SCHEDULE 40 PVC) TO THE POWER SOURCE WITH AN ELECTRICAL | | | PULL BOX (240V CIRCUIT). | | | | | | 13) SATISFIED. PROVIDE PARKING TABLE SHOWCASING THE | | | NUMBER OF DESIGNATED PARKING SPACES, INCLUSIVE OF ADA, | | | SPECIALTY OR RESTRICTED SUCH AS TRAILERS, AND BICYCLE | | | ONES. PLEASE PROVIDE DOCUMENT NAME AND SHEET NUMBER | | | SHOWCASING SUCH TABLE | | | | | | 14) PARTIALLY SATISFIED. PROVIDE AND INDICATE FREIGHT | | | DELIVERY LOADING ZONE. PROVIDE DIMENSIONS IN THE | | | TRANSPORTATION SPECIFIC SITE PLAN. NOTE: THE DESIGNATED | | | AREA SHOULD BE STRICTLY FOR COMMERCIAL VEHICLES AND | | | SHOULD BE MARKED AND SIGNED ACCORDINGLY | | | | | | 15) SATISFIED. PROVIDE A SIDEWALK WITH 10 FEET MINIMUM | | | WIDTH ALONG SITE FRONTAGE. IMPLEMENTATION OF A MULTIUSE | | | PATHWAY, WITH DISTINCT BICYCLE LANES IS STRONGLY | | | ENCOURAGED. PLEASE | | | | | | 16) NOT SATISFIED. ARE THERE ANY DESIGNATED | | | PICK-UP/DROP-OFF OR VALET AREAS? IF SO CLEARLY INDICATE | | | THEM ON THE SITE PLAN. COMMENT IS REFERRING TO | | | PASSENGER PICK-UP/DROP-OFF OPERATIONS, NOT COMMERCIAL | | | LOADING/UNLOADING. IN CASE OF THE FORMER, A VALET | | | OPERATIONAL ANALYSIS SHOULD BE PROVIDED | | | | | | 17) SATISFIED. THERE IS A CONCEPT TO EXTEND NORTHWOOD | | | RD TO FLAGLER, AND POTENTIALLY INSTALL A ROUNDABOUT IN | | | LIEU OF AN INTERSECTION. PLEASE COORDINATE WITH | | | PLANNING AND CRA ON THIS ITEM, AS IT MAY AFFECT THE | | | LAYOUT OF THE PARKING AREA AND THE ALIGNMENT OF THE | | | DRIVEWAYS. | | | | | | 18) PROVIDE A PAVEMENT MARKING AND SIGNAGE PLAN. THIS | | | SHOULD BE A SEPARATE SITE PLAN SHEET OR INCLUDED IN THE | | | TRANSPORTATION SPECIFIC SITE PLAN | | | | | | 19) PROVIDE A SEPARATED AND PROTECTED TWO-WAY BIKE LANE | | | ALONG THE EASTERN SIDE OF FLAGLER DR ACCORDING TO THE | | | CITY BICYCLE MASTERPLAN. THIS IS A MAJOR ITEM, PLEASE | | | CONTACT ENGINEERING SERVICES FOR FURTHER DISCUSSION OR | | | CLARIFICATIONS | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
11-16-2021 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
11-16-2021 |
Time |
|
Rev Time |
|
| Received By |
llouie |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-11-16 11:17:31 | TRAFFIC COMMENTS | | | 1) PROVIDE COUNTY TPS LETTER | | | 2) A COMPREHENSIVE TRAFFIC STUDY WILL BE REQUIRED. | | | PLEASE SCHEDULE A METHODOLOGY MEETING WITH THE TRAFFIC | | | ENGINEERING GROUP, PRIOR TO REVISING OR RESUBMITTING | | | THE TRAFFIC STUDY | | | 3) IN THE TRIP GENERATION TABLE ADD THE CAF? PAVILION | | | AS A TRIP GENERATOR | | | 4) PROVIDE A FIGURE SHOWCASING DRIVEWAY(S) VOLUMES AND | | | DIRECTIONAL SPLIT, BOTH INBOUND AND OUTBOUND | | | 5) PROVIDE EXISTING WEEKEND TRAFFIC COUNTS | | | 6) PROVIDE PROPOSED DEVELOPMENT SITE PLAN IN THE | | | TRAFFIC STUDY | | | 7) A DETAILED INTERNAL CIRCULATION ANALYSIS SHALL BE | | | PROVIDED | | | | | | SITE COMMENTS | | | 8) PROVIDE A CLEAN SITE PLAN, SHOWCASING ONLY | | | TRANSPORTATION FEATURES (I.E. ROAD, CURB, GUTTER, | | | SIDEWALK, DRIVEWAY, PAVEMENT MARKING, SIGNAGE, PATHWAY, | | | WALKWAY, PEDESTRIAN CROSSING, LOADING ZONE, | | | PICK-UP/DROP-OFF AREA) AND CORRESPONDING DIMENSIONS | | | 9) PROVIDE TYPICAL PARKING STALL DIMENSIONS AND | | | TYPOLOGY (I.E. NORMAL, COMPACT, TRAILER). MARK OR | | | PROPERLY LABEL EACH OF THEM ON THE SITE PLAN | | | 10) ON THE SITE PLAN, PLEASE SHOWCASE BASIC CURB | | | DETAILS (I.E. DRIVEWAY AND PARKING STALLS IF ANY) ON | | | THE OPPOSITE SIDE OF THE ROADS SURROUNDING THE PROPOSED | | | DEVELOPMENT | | | 11) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND/OR | | | SERVICE VEHICLES DRIVING IN AND OUT OF THE PROPOSED | | | DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES CLEARLY | | | DEFINED. ALSO PROVIDE ANALYSIS FOR TYPICAL TRUCK WITH | | | BOAT TRAILER. INSERT DESIGN VEHICLES DETAILS IN THE | | | DRAWING. PLEASE PROVIDE DOCUMENT NAME AND SHEET NUMBER | | | SHOWCASING THE ANALYSIS. | | | 12) IDENTIFY AND DESIGNATE AN EASILY ACCESSIBLE | | | MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20 FEET) AND | | | PROVIDE BASIC ELECTRIFICATION READINESS. FOR THE LATTER | | | ITEM, MORE SPECIFICALLY: A CONDUIT (2" SCHEDULE 40 PVC) | | | TO THE POWER SOURCE WITH AN ELECTRICAL PULL BOX (240V | | | CIRCUIT). | | | 13) PROVIDE PARKING TABLE SHOWCASING THE NUMBER OF | | | DESIGNATED PARKING SPACES, INCLUSIVE OF ADA, SPECIALTY | | | OR RESTRICTED SUCH AS TRAILERS, AND BICYCLE ONES. | | | PLEASE PROVIDE DOCUMENT NAME AND SHEET NUMBER | | | SHOWCASING SUCH TABLE | | | 14) PROVIDE AND INDICATE FREIGHT DELIVERY LOADING ZONE | | | 15) PROVIDE A SIDEWALK WITH 10 FEET MINIMUM WIDTH ALONG | | | SITE FRONTAGE. IMPLEMENTATION OF A MULTIUSE PATHWAY, | | | WITH DISTINCT BICYCLE LANES IS STRONGLY ENCOURAGED | | | 16) ARE THERE ANY DESIGNATED PICK-UP/DROP-OFF OR VALET | | | AREAS? IF SO CLEARLY INDICATE THEM ON THE SITE PLAN | | | 17) THERE IS A CONCEPT TO EXTEND NORTHWOOD RD TO | | | FLAGLER, AND POTENTIALLY INSTALL A ROUNDABOUT IN LIEU | | | OF AN INTERSECTION. PLEASE COORDINATE WITH PLANNING AND | | | CRA ON THIS ITEM, AS IT MAY AFFECT THE LAYOUT OF THE | | | PARKING AREA AND THE ALIGNMENT OF THE DRIVEWAYS. | | | | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
05-17-2023 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
05-17-2023 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
05-17-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-05-17 14:03:04 | GENERAL COMMENTS: | | | | | | 1.) SATISFIED - PROVIDE WRITTEN CONFIRMATION THAT THE | | | PUBLIC UTILITIES DEPARTMENT HAS REVIEWED THE PROPOSAL | | | FOR WATER, SEWAGE TREATMENT, STORM DRAINAGE AND GARBAGE | | | COLLECTION SERVICES. PLEASE CONTACT THE CITY'S | | | ENGINEERING SERVICES DEPARTMENT AT (561) 494-1040. | | | | | | 2.) SATISFIED - PROVIDE LETTERS FROM THE FOLLOWING | | | PUBLIC UTILITIES CONFIRMING THAT THE PROPOSED PROJECT | | | DOES NOT ENCROACH INTO THEIR UTILITY EASEMENTS OR | | | OTHERWISE INTERFERE WITH THE PROVISION OF THEIR | | | SERVICES: AT&T, FPL, FPU AND COMCAST. | | | | | | 3.) SATISFIED - IS THE PALM BEACH COUNTY TRAFFIC | | | DIVISION AWARE THAT THE PROPOSED PARK REDEVELOPMENT | | | PROJECT INCLUDES A NEW 8,795 SQ. FT. RESILIENCY HUB AND | | | A 9,387 SQ. FT. CAFE/RESTAURANT? THE TPS LETTER | | | PROVIDED (DATED 11/18/2021) TO STAFF DOES NOT | | | ACKNOWLEDGE THESE IMPROVEMENTS. PLEASE PROVIDE EMAIL | | | DOCUMENTATION WITH THE COUNTY'S TRAFFIC DIVISION THAT | | | THEY ACKNOWLEDGE THESE IMPROVEMENTS IN THE 11/18/2021 | | | TPS LETTER OR OBTAIN A REVISED TPS LETTER WITH THE | | | PROPOSED IMPROVEMENTS TO THE PARK CLEARLY NOTED. | | | | | | | | | SITE PLAN COMMENTS: | | | | | | 1.) PARTIALLY SATTISFIED - A NOTE STATING: "MAIN PARK | | | ENTRANCE SHALL ALIGN WITH FUTURE NORTHWOOD ROAD | | | EXTENSION" ADDED IN THE SITE PLAN (SHEET C3.06). THE | | | APPLICANT SHALL CONTINUE TO WORK WITH CITY STAFF ON THE | | | ALIGNMENT OF THE MAIN PARK ENTRANCE WITH THE ROADWAY | | | EXTENSION ONCE THE DETAILS ON THE ROADWAY EXTENSION HAS | | | BEEN FINALIZED (CURRENTLY IN PROGRESS). AT THAT TIME, | | | THE SITE PLAN SHALL BE AMENDED TO REFLECT THE FINAL | | | PARK ENTRANCE CONFIGURATION AT THE NORTHWOOD ROAD | | | EXTENSION. A CONDITION OF APPROVAL WILL BE ADDED. THE | | | APPLICANT SHALL WORK WITH PLANNING STAFF ON THE | | | ALIGNMENT OF THE MAIN PARK ENTRANCE WITH THE FUTURE | | | NORTHWOOD ROAD EXTENSION. A NOTE STATING | | | | | | 2.) SATISFIED - EMAIL CONFORMATION FROM SAMANTHA BROWNE | | | OF FDEP ON 01.12.2023, CONFIRMING THAT THE PROPOSED | | | SUNTRAIL REROUTE DOES NOT NEGATIVELY IMPACT THE FLORIDA | | | GREENWAYS AND TRAILS (FGTS) PLANNING CORRIDOR. THE FGTS | | | PLANNING COORIDOR IS MAPPED BY FDEP. THE NOTED | | | "PROPOSED SUN TRAIL" (SEE SHEET C0.01) APPEARS TO BE | | | INCONSISTENT WITH THE LINKAGE TO THE ACTUAL SUN TRAIL | | | NETWORK AS PROVIDED ON THE FDOT WEBSITE. PLEASE ADDRESS | | | IN THE PLANS. THE PROPOSED TRAIL SHOULD LINK TO THE | | | ACTUAL NETWORK. IF THE INTENT IS TO REROUTE THE SUN | | | TRAIL, PLEASE PROVIDE MORE INFORMATION, STEPS TO MODIFY | | | AND COORDINATION WITH FDOT TO ACHIEVE THE REROUTE. | | | | | | 3.) PARTIALLY SATISFIED - CHANGES FROM LAST REVIEW | | | CYCLE HAVE BEEN DETECTED IN THE REVISED PLAN SHEETS. | | | ALL KEY PLANS AND DETAIL SHEETS SHALL BE CONSISTENT AND | | | ADDRESS THE FOLLOWING: | | | | | | 3.1) THE PROPOSED "OUTDOOR DINING PLAZA" (#13 IN THE | | | KEY PLAN) SHOULD ALSO REFERENCE THE CAFE BUILDING. | | | | | | 3.2) #15 IN THE KEY PLAN REFERENCES A PUMP STATION; | | | HOWEVER, THIS SHOULD BE CORRECTED TO LIFT STATION FOR | | | ACCURACY. | | | | | | 3.3) THE PROPOSED MICROMOBILITY STATION (#16 IN THE KEY | | | PLAN) IS NOT PROVIDED IN THE DETAIL SHEETS. AT MINIMUM, | | | A PLACEHOLDER SPACE SHALL BE PROVIDED IN THE PLANS. | | | | | | 3.4) PER DISCUSSION WITH THE ADMINSTATOR OF PUBLIC ART | | | AND CULTURE, THE KEY PLAN AND DETAILS SHALL REFERENCE | | | THE LOCATION OF THE INTERACTIVE SCULPTURE/PUBLIC ART. | | | | | | 4.) SATISFIED - GENERAL DEVELOPMENT STANDARDS TABLE | | | (SHEET C3.00) APPEARS TO BE MISSING INFORMATION ON THE: | | | A) PROVIDED LOT COVERAGE BY BUILDINGS B) PROVIDED LOT | | | COVERAGE OF IMPERVIOUS SURFACE C) PROVIDED MAXIMUM | | | BUILDING HEIGHT D) PROVIDED FAR. | | | | | | 5.) PARTIALLY SATIFISFIED - STORAGE BUILDING/KIOSK | | | BUILDING CALCULATIONS PROVIDED BUT ARE INCONSISTENT | | | WITH THE ARCHITECTURL DRAWINGS. IS THE BUILDING SQUARE | | | FOOTAGE FOR THE PROPOSED 15 FT. X 30 FT. STORAGE | | | BUILDING/KIOSK LOCATED IN THE AREA OF THE FITNESS LAWN | | | INCLUDED IN THE BUILDING CALCULATIONS? | | | | | | 6.) SATISFIED - ARTIFICIAL TURF REMOVED FROM THE PLANS. | | | PLANS STILL SHOWS THAT ARTIFICIAL TURF WILL BE USED IN | | | THE FITNESS LAWN AREA. AS DISCUSSED AT PREVIOUS | | | MEETINGS WITH STAFF, ARTIFICIAL TURF IS NOT A PERMITTED | | | MATERIAL. [ZLDR S.94-451] | | | | | | 7.) PARTIALLY SATISFIED - LOCATION OF ART BETWEEN THE | | | SPLASH PAD AND RESILIENCY HUB APPROVED BY THE | | | ADMINSTRATOR OF PUBLIC ART AND CULTURE ON 05.16.2023. | | | PLEASE LABEL IN ALL PLAN SHEETS AND KEY PLAN SHEETS THE | | | LOCATION OF THE "INTERACTIVE SCULPTURE/PUBLIC ART." THE | | | PROPOSED PUBLIC ART PLATFORM IS CURRENTLY LOCATED | | | BETWEEN THE SPORTS COURTS AND RESILIENCY HUB. CONSIDER | | | RELOCATING THE PLATFORM TO AN AREA THAT COULD GENERATE | | | BETTER INTERACTION WITH PARK USERS OR CREATE SPACE | | | AROUND THE PLATFORM THAT WOULD GENERATE PEDESTRIAN | | | ACTIVITY. | | | | | | 8.) SATISFIED - PLANS NOW SHOWS A BUILDING SEPARATION | | | OF 69.33 FT. BETWEEN THE RESILIANCY HUB AND CAF?? | | | BUILDING. WHAT IS THE BUILDING SEPARATION BETWEEN THE | | | PROPOSED RESILIENCY HUB AND CAFE PLEASE PROVIDE | | | DIMENSION IN THE PLAN TO DEMONSTRATE COMPLIANCE WITH | | | THE MINIMUM 25 FT. BUILDING SEPARATION. | | | | | | 9.) SATISFIED - 05.09.2023 EMAIL FROM KEVIN VOLBRECHT, | | | DIRECTOR OF EGINEERING SERVICES DEPARTMENT, STATING | | | THAT THE PROPOSED DRIVEWAYS (FOUR (4) IN TOTAL) ARE | | | APPROVED BY THE ENGINEERING SERVICES DEPARTMENT FOR THE | | | CURRIE PARK REDEVELOPMENT PROJECT PURSUANT TO | | | S.94-312(3) OF THE ZLDRS. PER ZLDR S.94-312(1), ONLY | | | ONE (1) ACCESS POINT IS PERMITTED UNLESS APPROVED BY | | | THE ENGINEERING SERVICES DIRECTOR OR DESIGNEE. PLEASE | | | PROVIDE WRITTEN CONFIRMATION THAT THE ENGINEERING | | | SERVICES DEPARTMENT DOES NOT OBJECT TO THE PROPOSED | | | NUMBER OF ACCESS POINTS INTO THE SITE. [ZLDR | | | S.94-312(3)] | | | | | | 10.) SATISFIED - PLAN SHOWS 122.58 FT. FROM THE | | | STORAGE/KIOSK TO THE PROPERTY LINE. THERE IS A PROPOSED | | | STORAGE/KIOSK BUILDING LOCATED IN THE VICINITY OF THE | | | FITNESS LAWN. THE BUILDING SETBACK DISTANCE HAS NOT | | | BEEN PROVIDED. PLEASE NOTE THAT A MINIMUM BUILDING | | | SETBACK OF 25 FT. FROM THE PROPERTY LINE(S) IS | | | REQUIRED. [ZLDR S.94-204] | | | | | | 11.) SATISFIED - THE RECONSTRUCTION OF 26TH STREET IS | | | NEAR COMPLETION AND THE NEW LAYOUT OF 26TH STREET SHALL | | | BE REFLECTED ACCURATELY IN THE PLANS TO ILLUSTRATE HOW | | | THE IMPROVEMENT WILL IMPACT THE INGRESS/EGRESS POINT | | | INTO THE PARKS NORTH ENTRANCE. | | | | | | 12.) SATISFIED - STRUCTURE IDENTIFIED AS A "SMALL CRAFT | | | SELF LAUNCH" IN THE PLANS. THERE APPEARS TO BE A NEW | | | STRUCTURE ATTACHED TO THE NORTHERN MOST EXISTING DOCK | | | TO REMAIN. WHAT IS THIS STRUCTURE? PLEASE IDENTIFY IN | | | THE PLANS. | | | | | | 13.) SATISFIED - AUTOTURN DIAGRAM PROVIDED. PLEASE | | | CLARIFY HOW BOAT TRAILER TRAFFIC WILL ENTER AND | | | CIRCULATE THROUGH THE PARK SITE. PER THE CHANGES TO THE | | | CMUD REGULATIONS AND VISION, THE INTENT IS TO KEEP BOAT | | | TRAILER TRAFFIC OFF THE NORTHWOOD ROAD EXTENSION. | | | | | | 14.) SATSIFIED - CLEARLY SHOW THE SETBACK DISTANCE OF | | | ALL STRUCTURES. ALL STRUCTURES MUST COMPLY WITH THE | | | MINIMUM SETBACK REQUIREMENTS OF THE ZLDRS. | | | | | | 15.) SATISFIED - AUTOTURN DIAGRAM PROVIDED. AN | | | AUTO-TURN DIAGRAM FOR LARGER VEHICLES/BOAT TRAILERS | | | SHALL BE PROVIDED TO DEMONSTRATE THE SAFE MANEUVERING | | | OF LARGER VEHICLES/TRAILERS THROUGH THE PARK SITE. | | | | | | 16.) SATISFIED - BICYCLE RACKS SHALL BE EVENLY | | | DISTRIBUTED THROUGH THE PARK. CONSIDER ADDING | | | ADDITIONAL RACKS NEAR THE SPORTS COURTS. | | | | | | 17.) SATISFIED - DETAILS PROVIDED IN SHEET C3.10. | | | BICYCLE RACK DETAIL IS REQUIRED. THE RACK DETAIL SHALL | | | BE CONSISTENT WITH THE STANDARDS OF THE CITY'S BICYCLE | | | PARKING GUIDELINES. CONTACT PLANNING STAFF FOR THE | | | BICYCLE PARKING GUIDELINES MANUAL. | | | | | | | | | PARKING COMMENTS: | | | | | | 1.) PARTIALLY SATISFIED - INCONSISTENCIES STILL | | | DETECTED IN THE BOAT TRAILER PARKING NUMBERS AND ON | | | STREET/OFFSITE PARKING. THE PARKING CALCULATIONS STILL | | | DOES NOT ADD UP IN THE PLAN SET. CALCULATIONS PROVIDED | | | MUST MATCH THE PLANS. PLEASE ADDRESS THE PARKING | | | CALCULATIONS FOR THE FOLLOWING: A) ON SITE BOAT AND | | | TRAILER PARKING; B) ON SITE SINGLE VEHICLE PARKING C) | | | ON STREET PARKING D) BICYCLE PARKING CALCULATIONS. | | | | | | 2.) NOT SATISFIED - STALL STRIPING DETAIL PROVIDED IS | | | NOT CONSISTENT WITH THE CITY'S STRIPING STANDARDS FOR | | | PARKING. A PARKING STALL STRIPING DETAIL SHALL BE | | | PROVIDED. THE STRIPING DETAIL SHALL BE CONSISTENT WITH | | | THE STRIPING REQUIREMENTS OF THE CITY. [ZLDR S.94-485] | | | | | | | | | ARCHITECTURAL PLANS: | | | | | | 1.) SATISFIED - ALL SIGNAGE PLACE HOLDERS REMOVED IN | | | ELEVATIONS. A NOTE ON THE ELEVATIONAL DRAWINGS STATING | | | THAT "ALL PROPOSED SIGNAGE SHALL COMPLY WITH ARTICLE | | | XIII, SIGN REGULATIONS, OF THE CITY OF WEST PALM BEACH | | | ZONING AND LAND DEVELOPMENT REGULATIONS (ZLDRS)" SHALL | | | BE PROVIDED. | | | | | | 2.) PARTIALLY SATISIFED - BUILDING HEIGHT TO THE TOP OF | | | THE PARAPET FOR THE EVENT PAVILION PROVIDED; HOWEVER, | | | THE BUILDING HEIGHT (TOP OF PARAPET) NOT PROVIDED FOR | | | THE CAF?? BUILDING. BUILDING HEIGHT DIMENSIONS MUST BE | | | PROVIDED TO THE HIGHEST POINT OF THE BUILDING. THIS WAS | | | NOT PROVIDED IN THE LATEST SET OF ARCHITECTURAL | | | DRAWINGS. | | | | | | 3.) NOT SATISFIED. THE KEY PLAN AND BUILDING SQUARE | | | FOOTAGES PROVIDED IN THE ARCHITECTURAL DRAWINGS (EVENT | | | PAVILION, CAFE BUILDING AND KIOSK) ARE STILL | | | INCONSISTENT WITH THE INFORMATION PROVIDED IN THE DATA | | | TABULARS. THE BUILDING SQUARE FOOTAGE CALCULATIONS ARE | | | STILL INCONSISTENT BETWEEN THE BUILDING CALCULATIONS | | | PROVIDED IN THE SITE PLAN AND THE ARCHITECTURAL PLANS. | | | THE BUILDING CALCULATIONS MUST MATCH FOR CONSISTENCY. | | | PLEASE ADDRESS | | | | | | 4.) NOT SATISFIED - ALTHOUGH THE PLANS ARE STILL A WORK | | | IN PROGRESS, SIGNED AND SEALED FINAL PLANS WILL BE | | | REQUIRED PRIOR TO THE ISSUANCE OF A SITE PLAN APPROVAL | | | LETTER. FINAL ARCHITECTURAL PLANS SHALL BE SIGNED AND | | | SEALED BY A FLORIDA REGISTERED ARCHITECT. THE LATEST | | | PLANS HAVE NOT BEEN SIGNED AND SEALED BY THE ARCHITECT. | | | | | | 6.) NEW COMMENT - HEIGHT OF THE BUILDING SHALL BE | | | MEASURED FROM THE GROUND ELEVATION FROM THE OUTSIDE OF | | | THE WALL (NOT THE FFE) TO THE TOP OF THE PARPAPET OF | | | EACH BUILDING. | | | | | | | | | INSTRUCTIONS FOR RESUBMITTAL: | | | | | | * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN | | | WRITTEN FORMAT. | | | | | | * ENSURE ALL PLAN SHEETS MATCH FOR CONSISTENCY PRIOR TO | | | RESUBMITTING. | | | | | | * PLEASE INCLUDE ALL REVISION DATES IN THE PLAN SHEETS. | | | | | | * WHEN RESUBMITTING PLEASE PROVIDE A MINIMUM OF TWO (2) | | | FULL COLORED PAPER COPIES, AND ONE COPY IN 11 INCHES X | | | 17 INCHES, AND AN ELECTRONIC COPY OF ALL PLANS AND | | | DOCUMENTS. | | | | | | * ANY CHANGES TO THE RESUBMITTED PLANS MAY RESULT IN | | | ADDITIONAL COMMENTS. | | | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | | QUESTIONS. | | | | | | | | | NOTES AND CONDITIONS: | | | | | | * PRIVATE USES OR STRUCTURES WITHIN THIS DISTRICT ARE | | | PROHIBITED UNLESS A CLASS A SPECIAL USE PERMIT FOR SUCH | | | ACTIVITIES IS GRANTED BY THE CITY COMMISSION. [ZLDR | | | S.94-204 - APPLICANT HAS ALSO NOTED AND ACKNOWLEGED | | | STANDARD IN THE PLANS.] | | | | | | * ADDITIONAL APPROVAL FROM THE SOUTH FLORIDA WATER | | | MANAGEMENT DISTRICT (SFWMD) SHALL BE REQUIRED FOR THE | | | PROPOSED IMPROVEMENTS WITHIN THE INTRACOASTAL WATERWAY. | | | SUCH APPROVAL SHALL BE REQUIRED PRIOR TO THE ISSUANCE | | | OF ANY BUILDING PERMIT FOR THE IMPROVEMENTS LOCATED | | | WITHIN THE INTRACOASTAL WATERWAY. | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
09-22-2022 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
09-22-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
09-22-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-09-22 12:58:14 | GENERAL COMMENTS: | | | | | | 1.) PROVIDE WRITTEN CONFIRMATION THAT THE PUBLIC | | | UTILITIES DEPARTMENT HAS REVIEWED THE PROPOSAL FOR | | | WATER, SEWAGE TREATMENT, STORM DRAINAGE AND GARBAGE | | | COLLECTION SERVICES. PLEASE CONTACT THE CITY'S | | | ENGINEERING SERVICES DEPARTMENT AT (561) 494-1040. | | | | | | [11/15/2021 REPEAT COMMENT: NOT ADDRESSED. THE REQUIRED | | | LETTER FROM THE PUBLIC UTILITIES DEPARTMENT HAS NOT | | | BEEN PROVIDED. THE LETTER SHALL BE PROVIDED PRIOR TO | | | THE ISSUANCE OF THE SITE PLAN APPROVAL LETTER.] | | | | | | | | | 2.) PROVIDE LETTERS FROM THE FOLLOWING PUBLIC UTILITIES | | | CONFIRMING THAT THE PROPOSED PROJECT DOES NOT ENCROACH | | | INTO THEIR UTILITY EASEMENTS OR OTHERWISE INTERFERE | | | WITH THE PROVISION OF THEIR SERVICES: AT&T, FPL, FPU | | | AND COMCAST. | | | | | | [11/15/2021 REAPEAT COMMENT: NOT ADDRESSED. THE | | | REQUIRED LETTERS FROM THE PUBLIC UTILITIES HAVE NOT | | | BEEN PROVIDED IN THE RESUBMITTAL. THE LETTERS SHALL BE | | | PROVIDED PRIOR TO THE ISSUANCE OF THE SITE PLAN | | | APPROVAL LETTER.] | | | | | | | | | 3.) IS THE PALM BEACH COUNTY TRAFFIC DIVISION AWARE | | | THAT THE PROPOSED PARK REDEVELOPMENT PROJECT INCLUDES A | | | NEW 8,795 SQ. FT. RESILIENCY HUB AND A 9,387 SQ. FT. | | | CAFE/RESTAURANT? THE TPS LETTER PROVIDED (DATED | | | 11/18/2021) TO STAFF DOES NOT ACKNOWLEDGE THESE | | | IMPROVEMENTS. PLEASE PROVIDE EMAIL DOCUMENTATION WITH | | | THE COUNTY'S TRAFFIC DIVISION THAT THEY ACKNOWLEDGE | | | THESE IMPROVEMENTS IN THE 11/18/2021 TPS LETTER OR | | | OBTAIN A REVISED TPS LETTER WITH THE PROPOSED | | | IMPROVEMENTS TO THE PARK CLEARLY NOTED. | | | | | | | | | SITE PLAN COMMENTS: | | | | | | 1.) THE APPLICANT SHALL WORK WITH PLANNING STAFF ON THE | | | ALIGNMENT OF THE MAIN PARK ENTRANCE WITH THE FUTURE | | | NORTHWOOD ROAD EXTENSION. | | | | | | [11/15/2021 REPEAT COMMENT: ALTHOUGH THE DETAILS ON THE | | | EXACT ALIGNMENT WITH THE FUTURE NORTHWOOD ROAD | | | EXTENSION IS STILL BEING WORKED OUT, A NOTE SHALL BE | | | PROVIDED IN THE PLANS THAT STATES THAT THE MAIN PARK | | | ENTRANCE (SOUTHERN ENTRANCE) INTO THE PARK SHALL ALIGN | | | WITH FUTURE NORTHWOOD ROAD EXTENSION.] | | | | | | | | | 2.) THE NOTED "PROPOSED SUN TRAIL" (SEE SHEET C0.01) | | | APPEARS TO BE INCONSISTENT WITH THE LINKAGE TO THE | | | ACTUAL SUN TRAIL NETWORK AS PROVIDED ON THE FDOT | | | WEBSITE. PLEASE ADDRESS IN THE PLANS. THE PROPOSED | | | TRAIL SHOULD LINK TO THE ACTUAL NETWORK. IF THE INTENT | | | IS TO REROUTE THE SUN TRAIL, PLEASE PROVIDE MORE | | | INFORMATION, STEPS TO MODIFY AND COORDINATION WITH FDOT | | | TO ACHIEVE THE REROUTE. | | | | | | | | | 3.) PLEASE ADDRESS THE FOLLOWING INCONSISTENCIES IN THE | | | KEY PLAN (SHEET C0.01) AND THE OVERALL SITE PLAN (SHEET | | | 3.00). PLEASE ENSURE ALL ENLARGEMENT/DETAILS SHEETS | | | ALSO MATCH FOR CONSISTENCY: A) PROPOSED GAME | | | COURT/FITNESS LAWN OR JUST FITNESS LAWN? B) LOCATION OF | | | THE KAYAK LAUNCH C) PROPOSED OUTDOOR CLASSROOMS OR | | | PLAZA WITH SEATING. | | | | | | | | | 4.) GENERAL DEVELOPMENT STANDARDS TABLE (SHEET C3.00) | | | APPEARS TO BE MISSING INFORMATION ON THE: A) PROVIDED | | | LOT COVERAGE BY BUILDINGS B) PROVIDED LOT COVERAGE OF | | | IMPERVIOUS SURFACE C) PROVIDED MAXIMUM BUILDING HEIGHT | | | D) PROVIDED FAR. | | | | | | | | | 5.) IS THE BUILDING SQUARE FOOTAGE FOR THE PROPOSED 15 | | | FT. X 30 FT. STORAGE BUILDING/KIOSK LOCATED IN THE AREA | | | OF THE FITNESS LAWN INCLUDED IN THE BUILDING | | | CALCULATIONS? IT IS NOT CLEAR IN THE ZONING INFORMATION | | | PROVIDED ON SHEET C3.00 (OVERALL SITE PLAN). | | | | | | | | | 6.) PLANS STILL SHOWS THAT ARTIFICIAL TURF WILL BE USED | | | IN THE FITNESS LAWN AREA. AS DISCUSSED AT PREVIOUS | | | MEETINGS WITH STAFF, ARTIFICIAL TURF IS NOT A PERMITTED | | | MATERIAL. [ZLDR S.94-451] | | | | | | | | | 7.) THE PROPOSED PUBLIC ART PLATFORM IS CURRENTLY | | | LOCATED BETWEEN THE SPORTS COURTS AND RESILIENCY HUB. | | | CONSIDER RELOCATING THE PLATFORM TO AN AREA THAT COULD | | | GENERATE BETTER INTERACTION WITH PARK USERS OR CREATE | | | SPACE AROUND THE PLATFORM THAT WOULD GENERATE | | | PEDESTRIAN ACTIVITY. | | | | | | [11/15/2021 REPEAT COMMENT: NOT ADDRESSED. PLEASE | | | CLARIFY IF THE PUBLIC ART PLATFORM HAS BEEN REMOVED | | | FROM THE PROJECT. THE RESPONSE COMMENTS TO PPRC STATES | | | THAT THE COMMENT HAS BEEN "ACKNOWLEDGED"; HOWEVER, THE | | | ART PLATFORM HAS BEEN REMOVED FROM THE LATEST REVISIONS | | | TO THE PLANS. IF THE PROPOSED PUBLIC ART PLATFORM HAS | | | BEEN REMOVED, COORDINATION ON HOW TO ADDRESS THE ART IN | | | PUBLIC PLACES REQUIREMENT WILL BE REQUIRED. PLEASE | | | CONTACT SYBILLE WELTER, ADMINISTRATOR OF PUBLIC ART AND | | | CULTURE, (561) 822-1521.] | | | | | | | | | 8.) WHAT IS THE BUILDING SEPARATION BETWEEN THE | | | PROPOSED RESILIENCY HUB AND CAFE PLEASE PROVIDE | | | DIMENSION IN THE PLAN TO DEMONSTRATE COMPLIANCE WITH | | | THE MINIMUM 25 FT. BUILDING SEPARATION. | | | | | | [11/15/2021 REPEAT COMMENT: PARTIALLY ADDRESSED. | | | ALTHOUGH THE DIMENSION IS REFERENCED IN THE RESPONSE TO | | | PPRC'S COMMENTS, STAFF HAD SPECIFICALLY REQUESTED THAT | | | THE DIMENSION IS PROVIDED IN THE PLAN SET TO | | | DEMONSTRATE COMPLIANCE WITH THE ZLDRS.] | | | | | | | | | 9.) PER ZLDR S.94-312(1), ONLY ONE (1) ACCESS POINT IS | | | PERMITTED UNLESS APPROVED BY THE ENGINEERING SERVICES | | | DIRECTOR OR DESIGNEE. PLEASE PROVIDE WRITTEN | | | CONFIRMATION THAT THE ENGINEERING SERVICES DEPARTMENT | | | DOES NOT OBJECT TO THE PROPOSED NUMBER OF ACCESS POINTS | | | INTO THE SITE. [ZLDR S.94-312(3)] | | | | | | [11/15/2021 REPEAT COMMENT: NOT ADDRESSED. THE COMMENT | | | HAS BEEN ACKNOWLEDGED, BUT THE DOCUMENTATION MUST BE | | | PROVIDED TO STAFF TO SATISFY THE COMMENT.] | | | | | | | | | 10.) THERE IS A PROPOSED STORAGE/KIOSK BUILDING LOCATED | | | IN THE VICINITY OF THE FITNESS LAWN. THE BUILDING | | | SETBACK DISTANCE HAS NOT BEEN PROVIDED. PLEASE NOTE | | | THAT A MINIMUM BUILDING SETBACK OF 25 FT. FROM THE | | | PROPERTY LINE(S) IS REQUIRED. [ZLDR S.94-204] | | | | | | | | | 11.) THE RECONSTRUCTION OF 26TH STREET IS NEAR | | | COMPLETION AND THE NEW LAYOUT OF 26TH STREET SHALL BE | | | REFLECTED ACCURATELY IN THE PLANS TO ILLUSTRATE HOW THE | | | IMPROVEMENT WILL IMPACT THE INGRESS/EGRESS POINT INTO | | | THE PARK???S NORTH ENTRANCE. | | | | | | [11/15/2021 REPEAT COMMENT: ALIGNMENT/IMPROVEMENTS OF | | | 26TH STREET NOT PROVIDED CONSISTENTLY IN ALL PLAN | | | SHEETS. TO ENSURE PEDESTRIAN SAFETY AND CONNECTIVITY TO | | | THE PARK, CROSSWALKS SHOULD ALSO BE PROVIDED AT THE NEW | | | SIDEWALK TO CONNECT TO THE PARK ON FLAGLER DRIVE. | | | PLEASE COORDINATE WITH THE ENGINEERING SERVICES | | | DEPARTMENT TO DETERMINE FEASIBILITY. PROVIDE ANY | | | DOCUMENTATION NECESSARY.] | | | | | | | | | 12.) THERE APPEARS TO BE A NEW STRUCTURE ATTACHED TO | | | THE NORTHERN MOST EXISTING DOCK TO REMAIN. WHAT IS THIS | | | STRUCTURE? PLEASE IDENTIFY IN THE PLANS. | | | | | | | | | 13.) PLEASE CLARIFY HOW BOAT TRAILER TRAFFIC WILL ENTER | | | AND CIRCULATE THROUGH THE PARK SITE. PER THE CHANGES TO | | | THE CMUD REGULATIONS AND VISION, THE INTENT IS TO KEEP | | | BOAT TRAILER TRAFFIC OFF THE NORTHWOOD ROAD EXTENSION. | | | | | | [11/15/2021 REPEAT COMMENT: NO DETAILED INFORMATION | | | PROVIDED. INFORMATION MUST BE CLEAR AND DOCUMENTED. | | | ACCORDING TO THE APPLICANT'S RESPONSE LETTER, IT IS | | | STILL A WORK IN PROGRESS WITH CITY STAFF AND THE | | | CONCERNS OF PLANNING STAFF HAVE BEEN ACKNOWLEDGED.] | | | | | | | | | 14.) CLEARLY SHOW THE SETBACK DISTANCE OF ALL | | | STRUCTURES. ALL STRUCTURES MUST COMPLY WITH THE MINIMUM | | | SETBACK REQUIREMENTS OF THE ZLDRS. | | | | | | [11/15/2021 MODIFIED COMMENT: ALL STRUCTURES INCLUDING | | | THE TENNIS COURT, FENCE, ETC. MUST COMPLY WITH THE | | | MINIMUM SETBACK REQUIREMENTS OF THE ROS ZONING | | | DISTRICT. ALSO, PLEASE NOTATE THE HEIGHT OF THE TENNIS | | | COURT FENCE AND FENCE AROUND THE PICKLEBALL COURTS. THE | | | HEIGHT OF THE FENCES SHALL BE CONSISTENT WITH THE | | | HEIGHT AND SETBACK REQUIREMENTS FOR FENCES IN THE | | | ZLDRS.] | | | | | | | | | 15.) AN AUTO-TURN DIAGRAM FOR LARGER VEHICLES/BOAT | | | TRAILERS SHALL BE PROVIDED TO DEMONSTRATE THE SAFE | | | MANEUVERING OF LARGER VEHICLES/TRAILERS THROUGH THE | | | PARK SITE. | | | | | | [11/15/2021 REPEAT COMMENT: AN AUTO TURN DIAGRAM WAS | | | PROVIDED FOR A SANITATION TRUCK; HOWEVER, MODIFICATIONS | | | HAVE BEEN MADE TO THE PARKING AREA FOR BOAT TRAILERS | | | AND IT IS IMPORTANT TO DEMONSTRATE HOW BOAT TRAILERS | | | CAN MANEUVER THE SITE SAFELY AND WITHOUT DAMAGE TO THE | | | SITE (I.E. LANDSCAPE ISLANDS, CURBS, ETC.). | | | | | | | | | 16.) BICYCLE RACKS SHALL BE EVENLY DISTRIBUTED THROUGH | | | THE PARK. CONSIDER ADDING ADDITIONAL RACKS NEAR THE | | | SPORTS COURTS. | | | | | | [11/15/2021 REPEAT COMMENT: ALTHOUGH THE APPLICANT HAS | | | ACKNOWLEDGED STAFF'S COMMENT, IT WOULD BE HELPFUL TO | | | PROVIDE A SEPARATE SHEET (GIVEN THE AMOUNT OF DETAIL | | | FOR THE PROJECT) SHOWING THE LOCATION OF THE BICYCLE | | | RACKS PLANNED FOR THE PROJECT TO CLEARLY DEMONSTRATE | | | THE EVEN DISTRIBUTION OF RACKS THROUGHOUT THE PROJECT | | | SITE. ALSO, PLEASE NOTE THAT THE NUMBER OF RACKS | | | PROVIDED IN THE PLANS MUST MATCH THE BICYCLE PARKING | | | CALCULATIONS.] | | | | | | | | | 17.) A BICYCLE RACK DETAIL IS REQUIRED. THE RACK DETAIL | | | SHALL BE CONSISTENT WITH THE STANDARDS OF THE CITY'S | | | BICYCLE PARKING GUIDELINES. CONTACT PLANNING STAFF FOR | | | THE BICYCLE PARKING GUIDELINES MANUAL. | | | | | | [11/15/2021 MODIFIED COMMENT: ALTHOUGH A DETAIL HAS | | | BEEN PROVIDED, MORE INFORMATION IS REQUIRED ON THE RACK | | | DETAIL, INCLUDING REQUIRED SPACING BETWEEN EACH POST.] | | | | | | | | | | | | PARKING COMMENTS: | | | | | | 1.) THE PARKING CALCULATIONS STILL DOES NOT ADD UP IN | | | THE PLAN SET. CALCULATIONS PROVIDED MUST MATCH THE | | | PLANS. PLEASE ADDRESS THE PARKING CALCULATIONS FOR THE | | | FOLLOWING: A) ON SITE BOAT AND TRAILER PARKING; B) ON | | | SITE SINGLE VEHICLE PARKING C) ON STREET PARKING D) | | | BICYCLE PARKING CALCULATIONS. | | | | | | 2.) A PARKING STALL STRIPING DETAIL SHALL BE PROVIDED. | | | THE STRIPING DETAIL SHALL BE CONSISTENT WITH THE | | | STRIPING REQUIREMENTS OF THE CITY. [ZLDR S.94-485] | | | | | | [11/15/2021 REPEAT COMMENT: NOT ADDRESSED. THE DETAIL | | | MUST BE INCLUDED IN THE PLAN SET TO DEMONSTRATE | | | CONSISTENCY WITH THE MINIMUM REQUIREMENTS OF THE ZLDRS. | | | ALSO, WILL THE PARKING STALLS HAVE WHEEL STOPS? IF SO, | | | THE WHEEL STOPS MUST BE ILLUSTRATED IN THE PLAN SHEETS | | | AND STALL STRIPING DETAIL.] | | | | | | | | | ARCHITECTURAL PLANS: | | | | | | 1.) A NOTE ON THE ELEVATIONAL DRAWINGS STATING THAT | | | "ALL PROPOSED SIGNAGE SHALL COMPLY WITH ARTICLE XIII, | | | SIGN REGULATIONS, OF THE CITY OF WEST PALM BEACH ZONING | | | AND LAND DEVELOPMENT REGULATIONS (ZLDRS)" SHALL BE | | | PROVIDED. | | | | | | [11/15/2021 REPEAT COMMENT: NOT ADDRESSED. THE PLANS DO | | | NOT PROVIDE THE REQUIRED NOTE. THE NOTE IS NECESSARY TO | | | ENSURE COMPLIANCE WITH THE ZLDRS FOR ANY PROJECT | | | SIGNAGE.] | | | | | | | | | 2.) BUILDING HEIGHT DIMENSIONS MUST BE PROVIDED TO THE | | | HIGHEST POINT OF THE BUILDING. THIS WAS NOT PROVIDED IN | | | THE LATEST SET OF ARCHITECTURAL DRAWINGS. | | | | | | 3.) THE BUILDING SQUARE FOOTAGE CALCULATIONS ARE STILL | | | INCONSISTENT BETWEEN THE BUILDING CALCULATIONS PROVIDED | | | IN THE SITE PLAN AND THE ARCHITECTURAL PLANS. THE | | | BUILDING CALCULATIONS MUST MATCH FOR CONSISTENCY. | | | PLEASE ADDRESS. | | | | | | 4.) FINAL ARCHITECTURAL PLANS SHALL BE SIGNED AND | | | SEALED BY A FLORIDA REGISTERED ARCHITECT. THE LATEST | | | PLANS HAVE NOT BEEN SIGNED AND SEALED BY THE ARCHITECT. | | | | | | | | | INSTRUCTIONS FOR RESUBMITTAL: | | | | | | * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN | | | WRITTEN FORMAT. | | | | | | * ENSURE ALL PLAN SHEETS MATCH FOR CONSISTENCY PRIOR TO | | | RESUBMITTING. | | | | | | * WHEN RESUBMITTING PLEASE PROVIDE A MINIMUM OF FOUR | | | (4) FULL COLORED PAPER COPIES, AND ONE COPY IN 11 | | | INCHES X 17 INCHES, AND AN ELECTRONIC COPY OF ALL PLANS | | | AND DOCUMENTS. | | | | | | * ANY CHANGES TO THE RESUBMITTED PLANS MAY RESULT IN | | | ADDITIONAL COMMENTS. | | | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | | QUESTIONS. | | | | | | | | | NOTES AND CONDITIONS: | | | | | | * PRIVATE USES OR STRUCTURES WITHIN THIS DISTRICT ARE | | | PROHIBITED UNLESS A CLASS A SPECIAL USE PERMIT FOR SUCH | | | ACTIVITIES IS GRANTED BY THE CITY COMMISSION. [ZLDR | | | S.94-204 ??? APPLICANT HAS ALSO NOTED AND ACKNOWLEGED | | | STANDARD IN THE PLANS.] | | | | | | * ADDITIONAL APPROVAL FROM THE SOUTH FLORIDA WATER | | | MANAGEMENT DISTRICT (SFWMD) SHALL BE REQUIRED FOR THE | | | PROPOSED IMPROVEMENTS WITHIN THE INTRACOASTAL WATERWAY. | | | SUCH APPROVAL SHALL BE REQUIRED PRIOR TO THE ISSUANCE | | | OF ANY BUILDING PERMIT FOR THE IMPROVEMENTS LOCATED | | | WITHIN THE INTRACOASTAL WATERWAY. | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
11-15-2021 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
11-15-2021 |
Time |
|
Rev Time |
|
| Received By |
llouie |
Date |
11-15-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-11-15 16:16:45 | GENERAL COMMENTS: | | | | | | 1.) ON THE COVER SHEET (SHEET C0.00), COMMISSIONER | | | KELLY SHOAF'S NAME IS INCORRECTLY SPELLED. PLEASE | | | CORRECT AS THE PROPOSED REDEVELOPMENT PROJECT IS | | | LOCATED WITHIN COMMISSIONER SHOAF'S DISTRICT (DISTRICT | | | 1). | | | | | | 2.) A TRAFFIC CONCURRENCY LETTER FROM PALM BEACH COUNTY | | | (TPS LETTER) IS REQUIRED. | | | | | | 3.) PROVIDE WRITTEN CONFIRMATION THAT THE PUBLIC | | | UTILITIES DEPARTMENT HAS REVIEWED THE PROPOSAL FOR | | | WATER, SEWAGE TREATMENT, STORM DRAINAGE AND GARBAGE | | | COLLECTION SERVICES. PLEASE CONTACT THE CITY'S | | | ENGINEERING SERVICES DEPARTMENT AT (561) 494-1040. | | | | | | 4.) PROVIDE LETTERS FROM THE FOLLOWING PUBLIC UTILITIES | | | CONFIRMING THAT THE PROPOSED PROJECT DOES NOT ENCROACH | | | INTO THEIR UTILITY EASEMENTS OR OTHERWISE INTERFERE | | | WITH THE PROVISION OF THEIR SERVICES: AT&T, FPL, FPL | | | AND COMCAST. | | | | | | 5.) ADDITIONAL APPROVAL FROM THE SOUTH FLORIDA WATER | | | MANAGEMENT DISTRICT (SFWMD) WILL BE REQUIRED FOR THE | | | PROPOSED IMPROVEMENTS WITHIN THE INTRACOASTAL WATERWAY. | | | SUCH APPROVAL IS REQUIRED PRIOR TO THE ISSUANCE OF ANY | | | BUILDING PERMIT FOR THE INTRACOASTAL WATERWAY | | | IMPROVEMENTS. | | | | | | | | | SITE PLAN COMMENTS: | | | | | | 1.) PLEASE MAKE THE FOLLOWING CORRECTIONS IN THE | | | OVERALL SITE PLAN (SHEET C0.01): A) THE EXISTING AND | | | PROPOSED LAND USE PLAN DESIGNATION IS COMMUNITY SERVICE | | | (CS) - NOT FOREST/PARK/RECREATION. B) PLEASE CLARIFY | | | THE BUILDING SQUARE FOOTAGES (RESILIENCY HUB AND CAFE) | | | IN THE DATA TABULAR (DOES NOT SEEM TO MATCH NUMBERS | | | PROVIDED IN THE SITE PLAN AND ARCHITECTURAL PLANS). C) | | | INCLUDE BICYCLE PARKING CALCULATIONS IN THE PARKING | | | DATA TABULAR. | | | | | | 2.) THE APPLICANT SHALL WORK WITH PLANNING STAFF ON THE | | | ALIGNMENT OF THE MAIN PARK ENTRANCE WITH THE NORTHWOOD | | | ROAD EXTENSION. | | | | | | 3.) PEDESTRIAN CROSSWALKS SHALL BE ESTABLISHED AT ALL | | | INGRESS/EGRESS POINTS TO PROVIDE LINKAGES TO THE | | | EXISTING SIDEWALK SYSTEM ALONG FLAGLER DRIVE. THE | | | CROSSWALKS WILL ALSO ENCOURAGE WALKABILITY AND PROMOTE | | | PEDESTRIAN SAFETY. | | | | | | 4.) THERE IS A LACK OF PEDESTRIAN INTEGRATION AND FLOW | | | BETWEEN THE SPORTS COURTS TO THE SOUTHERN HALF OF THE | | | PARK (I.E. RESILIENCY HUB, CAFE, ETC.). BETTER | | | PEDESTRIAN CONNECTIONS/CROSSOVER SHALL BE PROVIDED | | | (I.E. ADDITION OF DECORATIVE CROSSWALKS, ETC.). | | | | | | 5.) WHY DOES THE HARDSCAPE HAVE DIFFERENT VARIATIONS OF | | | SHADING? IS THERE A COLOR COORDINATED PLAN THAT SHOWS | | | THE TYPE OF HARDSCAPE MATERIAL FOR THE PROJECT? | | | | | | 6.) PLEASE CLARIFY HOW BOAT TRAILER TRAFFIC WILL ENTER | | | AND CIRCULATE THROUGH THE PARK SITE. PER THE CHANGES TO | | | THE CURRIE MIXED USE DISTRICT (CMUD) REGULATIONS AND | | | VISION, THE INTENT IS TO KEEP BOAT TRAILER TRAFFIC OFF | | | THE NORTHWOOD ROAD EXTENSION. | | | | | | 7.) AN AUTO-TURN DIAGRAM FOR LARGER VEHICLES/BOAT | | | TRAILERS SHALL BE PROVIDED TO DEMONSTRATE THE SAFE | | | MANEUVERING OF LARGER VEHICLES/TRAILERS THROUGH THE | | | PARK SITE. | | | | | | 8.) THE NORTH PARKING AREA IS DESIGNED WITH A MIX OF | | | REGULAR AND BOAT TRAILER PARKING SPACES. STAFF HAS | | | CONCERNS WITH THE INTERMINGLING OF REGULAR VEHICLES | | | WITH BOAT TRAILERS FOR SAFE AND EFFICIENT TRAFFIC | | | CIRCULATION THROUGH THE AREA. CAN THE PARKING FOR THE | | | DIFFERENT TYPES OF USES (I.E. REGULAR VEHICLES AND BOAT | | | TRAILERS) BE SEPARATED TO PREVENT ANY CONFLICT WITH | | | TRAFFIC AND SITE CIRCULATION? | | | | | | 9.) THE PARKING AREA NORTH OF THE PROPOSED BASKETBALL | | | COURT REQUIRES A T-TURNAROUND/ADEQUATE | | | TURNAROUND/CIRCULATION DESIGNED FOR THE END STALLS. | | | | | | 10.) PARKING STALL STRIPING DETAIL SHALL BE PROVIDED. | | | THE STRIPING DETAIL SHALL BE CONSISTENT WITH THE | | | STRIPING REQUIREMENTS OF THE CITY. [ZLDR S.94-485] | | | | | | 11.) THE RECONSTRUCTION OF 26TH STREET IS NEAR | | | COMPLETION AND THE NEW LAYOUT OF 26TH STREET SHALL BE | | | REFLECTED ACCURATELY IN THE PLANS TO ILLUSTRATE HOW THE | | | IMPROVEMENT WILL IMPACT THE INGRESS/EGRESS POINT INTO | | | THE NORTH PARKING LOT. | | | | | | 12.) BICYCLE RACKS SHALL BE EVENLY DISTRIBUTED THROUGH | | | THE PARK. CONSIDER ADDING ADDITIONAL RACKS NEAR THE | | | SPORTS COURTS. | | | | | | 13.) A BICYCLE RACK DETAIL IS REQUIRED. THE RACK DETAIL | | | SHALL BE CONSISTENT WITH THE STANDARDS OF THE CITY'S | | | BICYCLE PARKING GUIDELINES. CONTACT PLANNING STAFF FOR | | | THE BICYCLE PARKING GUIDELINES MANUAL. | | | | | | 14.) THE PROPOSED PUBLIC ART PLATFORM IS CURRENTLY | | | LOCATED BETWEEN THE SPORTS COURTS AND RESILIENCY HUB. | | | CONSIDER RELOCATING THE PLATFORM TO AN AREA THAT COULD | | | GENERATE BETTER INTERACTION WITH PARK USERS OR CREATE | | | SPACE AROUND THE PLATFORM THAT WOULD GENERATE | | | PEDESTRIAN ACTIVITY. | | | | | | 15.) ACCORDING TO THE SITE PLAN, BISTRO/CAFE SEATING | | | WILL BE PROVIDED ON THE SOUTHWEST SIDE OF THE EVENT | | | LAWN. THE SEATING IS NOT LOCATED NEAR THE CAFE/BISTRO | | | AND SEEMS TO BE ISOLATED. IT WOULD BE LOGICAL TO LOCATE | | | THE SEATING NEAR THE CAFE/BISTRO USE. | | | | | | 16.) PLEASE EXPLAIN THE USE OF THE RESILIENCY HUB. IS | | | IT ONLY OPEN TO PRIVATE EVENTS? | | | | | | 17.) CLEARLY SHOW THE SETBACK DISTANCE OF STRUCTURES, | | | PARKING FACILITIES, ETC. TO THE PROPERTY LINE(S). PER | | | ZLDR S.94-204(2)(F), THE REQUIRED SETBACKS SHALL NOT BE | | | USED FOR OFF-STREET PARKING AND DRIVEWAYS TO SERVE | | | PARKING FACILITIES CONTAINING FIVE (5) OR MORE PARKING | | | SPACES. PLEASE PROVIDE DIMENSIONS TO DEMONSTRATE | | | COMPLIANCE. ALSO, THE SOUTHERN MOST PARKING LOT DOES | | | NOT SEEM TO COMPLY WITH THIS ZONING REQUIREMENT. | | | | | | 18.) WHAT IS THE BUILDING SEPARATION BETWEEN THE | | | PROPOSED RESILIENCY HUB AND CAFE? PLEASE PROVIDE | | | DIMENSION IN THE PLAN TO DEMONSTRATE COMPLIANCE WITH | | | THE MINIMUM 25 FT. BUILDING SEPARATION. [ZLDR | | | S.94-204(2)(E)] | | | | | | 19.) BUILDING HEIGHT SHALL BE MEASURED FROM GRADE. PER | | | ZLDR S.94-204(5), THE MAXIMUM ALLOWABLE BUILDING HEIGHT | | | IN THE ROS ZONING DISTRICT IS 35 FT. OR 1 FT. OF HEIGHT | | | FOR EACH 1.5 FT. OF SETBACK, WHICHEVER IS GREATER. | | | CLEARLY PROVIDE THE BUILDING HEIGHT IN THE ELEVATIONS | | | AND BUILDING SETBACK DISTANCE FROM THE PROPERTY LINES | | | TO DEMONSTRATE COMPLIANCE WITH THE ZLDRS. | | | | | | 20.) IS THE "RESILIENCY HUB" REFERENCED ON SHEETS C0.01 | | | AND IN THE SITE PLAN THE SAME AS THE "EVENT PAVILION" | | | IN THE ARCHITECTURAL SHEETS? PLEASE ADDRESS FOR | | | CONSISTENCY. | | | | | | 21.) PER ZLDR S.94-312(1), ONLY ONE (1) ACCESS POINT IS | | | PERMITTED UNLESS APPROVED BY THE ENGINEERING SERVICES | | | DIRECTOR OR DESIGNEE. PLEASE PROVIDE WRITTEN | | | CONFIRMATION THAT THE ENGINEERING SERVICES DEPARTMENT | | | DOES NOT OBJECT TO THE PROPOSED NUMBER OF ACCESS POINTS | | | INTO THE SITE. [ZLDR S.94-312(3)] | | | | | | 22.) A ONE-WAY DRIVE AISLE/ACCESS POINT CANNOT EXCEED | | | 12 FT. IN WIDTH; A TWO-WAY DRIVE AISLE/ACCESS POINT | | | CANNOT EXCEED 24 FT. IN WIDTH, UNLESS APPROVED BY THE | | | ENGINEERING SERVICES DEPARTMENT FOR AN ALTERNATIVE | | | DESIGN. BASED ON STAFF'S REVIEW AND ASSESSMENT OF THE | | | PROPOSED PLAN, THE ONE-WAY INGRESS/EGRESS FOR THE SOUTH | | | PARKING LOT CAN BE REDUCED (~38 FT. WIDE). REDUCING THE | | | WIDTH OF THE INGRESS/EGRESS POINTS WILL ALSO IMPROVE | | | PEDESTRIAN SAFETY/WALKABILITY. [ZLDR S.94-312(3) AND | | | S.94-485] | | | | | | 23.) PLEASE PROVIDE DIMENSIONS FOR ALL DRIVE AISLES | | | (NOT ALL SHEETS PROVIDE INFORMATION). | | | | | | | | | ARCHITECTURAL PLANS: | | | | | | 1.) CLARIFICATION IS NEEDED ON THE BUILDING SQUARE | | | FOOTAGE CALCULATIONS FOR THE PROPOSED RESILIENCY HUB | | | AND CAFE. THE BUILDING SQUARE FOOTAGES DO NOT ADD UP | | | BETWEEN THE SITE PLAN AND THE ARCHITECTURAL PLANS. | | | | | | 2.) A NOTE ON THE ELEVATIONAL DRAWINGS STATING THAT | | | "ALL PROPOSED SIGNAGE SHALL COMPLY WITH ARTICLE XIII, | | | SIGN REGULATIONS, OF THE CITY'S ZONING AND LAND | | | DEVELOPMENT REGULATIONS (ZLDRS)," SHALL BE PROVIDED. | | | | | | | | | INSTRUCTIONS FOR RESUBMITTAL: | | | | | | * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN | | | WRITTEN FORMAT. | | | | | | * WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF FIVE | | | (5) PAPER COPIES, ONE (1) REDUCED COPY IN 11 INCHES X | | | 17 INCHES, AND AN ELECTRONIC COPY OF ALL PLANS. | | | | | | * ANY CHANGES TO THE RESUBMITTED PLANS MAY RESULT IN | | | ADDITIONAL COMMENTS. | | | | | | * PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20 PERCENT OF THE ORIGINAL APPLICATION FEE | | | ($300.00). | | | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | | QUESTIONS. | | | |
|
|
| |