Review Stop AIPP ART IN PUBLIC PLACES
Rev No 4 Status P Date 10-04-2022 Cont ID  
Sent By rrossano Date 09-26-2022 Time 13:15 Rev Time 0.00
Received By swelter Date 10-04-2022 Time 11:43 Sent To  
Notes
2022-10-04 11:43:25PASSED WITH THE FOLLOWING CONDITIONS:
 A COMPLETED ART ASSESSMENT APPLICATION MUST BE PROVIDED
 BEFORE OR AT TIME OF BUILDING PERMIT FEES
 EVIDENCE OF ESCROW MUST BE SUBMITTED AT TIME OF
 BUILDING PERMIT FEES
 IDENTIFIED AREAS FOR ART ARE SUBJECT TO CHANGE BY THE
 ARTLIFE STAFF/COMMITTEE
 ARTIST(S) AND CONCEPT PROPOSALS ARE SUBJECT TO THE
 ARTLIFE APPROVAL PROCESS FOR PUBLIC ART
  

Review Stop AIPP ART IN PUBLIC PLACES
Rev No 3 Status F Date 08-08-2022 Cont ID  
Sent By scwelter Date 08-08-2022 Time 13:04 Rev Time 0.00
Received By scwelter Date 08-08-2022 Time 13:09 Sent To  
Notes
2022-08-08 13:09:24THE SITE AND LANDSCAPE PLANS MUST INCLUDE THE ART
 SITE(S) PRIOR TO SITE PLAN APPROVAL. THE RECENTLY
 SUBMITTED PLANS DO NOT SHOW ANY POTENTIAL ART SITES.
 SITE DO DO NEED TO BE PUBLICLY ACCESSIBLE. A FEW
 CONSIDERATIONS: THE GARDEN AREA, 24TH STREET PASEO
 TOWARDS THE RAILROAD, BROADWAY AND NORTHWOOD ROAD. THE
 TYPE OF ART AND/OR ARTIST DOES NOT NEED TO BE INCLUDED
 ONLY PROPOSED SITES.
 THE ART ASSESSMENT APPLICATION WAS EMAILED TO JOSH
 HORNING AND GILBERT BENHAMAU PAGE ONE NEEDS TO BE
 COMPLTED AND RETURNED TO MY ATTENTION AT
 [email protected].

Review Stop AIPP ART IN PUBLIC PLACES
Rev No 2 Status F Date 06-09-2022 Cont ID  
Sent By scwelter Date 06-09-2022 Time 11:27 Rev Time 0.00
Received By scwelter Date 06-09-2022 Time 11:49 Sent To  
Notes
2022-06-09 11:44:36SPOKE WITH GILBERT BENHAMOU DISCUSSED ART PROCESS ON
 JUNE 3RD, 2022.
 1. MISSING ART ASSESSMENT APPLICATION SENT 6.9.2020 -
 NEEDS TO BE COMPLETED INCLUDING ESCROW OF THE 1% DUE AT
 TIME OF BUILDING PERMIT APPLICATION - PRINTING OF
 PERMIT WILLL BE HELD UNTIL APPLICATION ALONG WITH
 ESCROW IS COMPLETED.
 2. POTENTIAL ART SITES NEED TO BE MARKED ON THE SITE
 PLAN FOR REVIEW. SITES NEED TO HAVE PUBLIC ACCESS.
 IDENTIFIED SITES WIL BE REVIEWED BY ALL DEPARTMENTS FOR
 ACCESSIBILITY, LANDSCAPE, UTILITIES, ETC.
  
 CONTACT [email protected] WITH ANY FURTHER QUESTIONS.
  
  

Review Stop AIPP ART IN PUBLIC PLACES
Rev No 1 Status F Date 11-18-2021 Cont ID  
Sent By fmittner Date 11-18-2021 Time 09:49 Rev Time 0.00
Received By scwelter Date 04-12-2022 Time 12:50 Sent To  
Notes
2021-11-10 10:59:08CONTACT SYBILLE WELTER: [email protected] FOR ART
 ASSESSMENT APPLICATION AND TO REVIEW ART REQUIREMENTS,
 POTENTIAL ART SITES, ARTISTS, AND ARTWORKS.
  
 TOTAL CONSTRUCTION COSTS OF THIS DEVELOPMENT ARE OVER
 $500,000 IT IS SUBJECT TO THE PUBLIC ART REQUIREMENT AS
 PER CITY ORDINANCE.
 SECTION 78-129: ALL PRIVATE DEVELOPMENT PROJECTS,
 INCLUDING NEW CONSTRUCTION, OR THE RENOVATION OR
 IMPROVEMENT OF AN EXISTING BUILDING, WHERE TOTAL
 CONSTRUCTION COSTS ARE EQUAL TO OR GREATER THAN
 $500,000 ARE SUBJECT TO THE PUBLIC ART REQUIREMENT.
 OPTION 1: INSTALL ARTWORK ON THE DEVELOPMENT SITE
 VALUED IN AN AMOUNT NOT LESS THAN ONE PERCENT OF THE
 TOTAL CONSTRUCTION COSTS; OR
 OPTION 2: CONTRIBUTE AN AMOUNT EQUAL TO 75 PERCENT OF
 ONE PERCENT OF THE TOTAL CONSTRUCTION COSTS FOR DEPOSIT
 TO THE PUBLIC ART ACCOUNT.
 A COMPLETED PUBLIC ART ASSESSMENT APPLICATION IS
 REQUIRED AT TIME OF BUILDING PERMIT SUBMITTAL.
  
 CONTACT SYBILLE WELTER, ADMINISTRATOR OF PUBLIC ART AND
 CULTURE AT [email protected] TO OBTAIN AN ART ASSESSMENT
 APPLICATION AND REVIEW THE REQUIREMENTS.
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status F Date 10-03-2022 Cont ID  
Sent By rbrown Date 10-03-2022 Time 18:42 Rev Time 0.00
Received By rbrown Date 10-03-2022 Time 18:42 Sent To  
Notes
2022-10-03 18:43:11DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR THE BUILDING PERMIT APPLICATION.
  
 2. DEMOLITION OF THE EXISTING BUILDINGS. AN ASBESTOS
 SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT
 REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH
 COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963,
 OR BY EMAIL: [email protected]
  
 3. REPLAT/UNITY OF TITLE. COMMENT NOT ADDRESSED. FOR
 ANY BUILDING CROSSING A PROPERTY LINE, EITHER A
 RECORDED UNITY OF TITLE, OR SOME OTHER APPROVED LEGAL
 INSTRUMENT, SHALL BE INCLUDED WITH THE PERMIT
 APPLICATION, OR THE BUILDING MUST HAVE A FIRE WALL
 ALONG THE PROPERTY LINE, PER SECTION 202 OF FLORIDA
 BUILDING CODE, BUILDING, FIRE SEPARATION DISTANCE.
  
 4. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT,
 THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR
 THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT,
 AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE
 FLORIDA BUILDING CODE.
  
 5. BUILDING LOCATION RELATIVE TO THE PROPERTY LINE AND
 OTHER STRUCTURES. WHEN SUBMITTED FOR BUILDING PERMIT,
 COMPLIANCE WITH ALL BUILDING SEPARATION, PERCENTAGE OF
 OPENINGS AND OPENING PROTECTIVE REQUIREMENTS OF
 CHAPTERS 6 AND 7 OF THE FLORIDA BUILDING CODE SHALL BE
 VERIFIED.
  
 6. ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE DOES
 NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL OPENINGS TO
 MEET THE DEFINITION OF AN OPEN PARKING GARAGE, IT WILL
 BE CONSIDERED AN ENCLOSED PARKING GARAGE AND MUST HAVE
 EXHAUST SYSTEMS. THE EXHAUST SYSTEMS SHALL BE DESIGNED
 TO MINIMIZE NOISE LEVELS USING INLINE FAN SILENCERS OR
 OTHER APPROVED METHODS.
  
 7. GREASE INTERCEPTOR. GREASE INTERCEPTORS WILL BE
 REQUIRED. FOR INFORMATION ON THE REQUIRED TYPE, SIZE
 AND LOCATION, PLEASE CONTACT RYAN BROWN, CHIEF PLUMBING
 INSPECTOR, DEVELOPMENT SERVICES DEPARTMENT, AT (561)
 805-6692, OR BY EMAIL: [email protected]
  
 8. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS,
 GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND
 OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS,
 SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC.
  
 9. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND
 CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF
 CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL
 NEIGHBORING PROPERTIES.
  
 10. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER
 AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY,
 INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE
 CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF
 NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION
 THAT MAY AFFECT THE USE OF THEIR PROPERTY.
  
 11. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT
 WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL
 HAVE A SEPARATE ADDRESS ASSIGNED BASED ON THE LOCATION
 OF THE BUILDING ENTRANCE. FOR STREET ADDRESSING,
 CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT
 (561) 805 6659, OR BY EMAIL: [email protected]
  
 12. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT
 TO ART LIFE ASSESSMENT UNDER THE CITY OF WEST PALM
 BEACH ART IN PUBLIC PLACES (AIPP) PROGRAM. FOR ADVICE
 ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP
 ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC
 PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL:
 [email protected]
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 08-11-2022 Cont ID  
Sent By rbrown Date 08-11-2022 Time 17:03 Rev Time 0.00
Received By rbrown Date 08-11-2022 Time 17:02 Sent To  
Notes
2022-08-11 17:03:22DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR THE BUILDING PERMIT APPLICATION.
  
 2. DEMOLITION OF THE EXISTING BUILDINGS. AN ASBESTOS
 SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT
 REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH
 COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963,
 OR BY EMAIL: [email protected]
  
 3. REPLAT/UNITY OF TITLE. FOR ANY BUILDING CROSSING A
 PROPERTY LINE, EITHER A RECORDED UNITY OF TITLE, OR
 SOME OTHER APPROVED LEGAL INSTRUMENT, SHALL BE INCLUDED
 WITH THE PERMIT APPLICATION, OR THE BUILDING MUST HAVE
 A FIRE WALL ALONG THE PROPERTY LINE, PER SECTION 202 OF
 FLORIDA BUILDING CODE, BUILDING, FIRE SEPARATION
 DISTANCE.
  
 4. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT,
 THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR
 THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT,
 AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE
 FLORIDA BUILDING CODE.
  
 5. BUILDING LOCATION RELATIVE TO THE PROPERTY LINE AND
 OTHER STRUCTURES. WHEN SUBMITTED FOR BUILDING PERMIT,
 COMPLIANCE WITH ALL BUILDING SEPARATION, PERCENTAGE OF
 OPENINGS AND OPENING PROTECTIVE REQUIREMENTS OF
 CHAPTERS 6 AND 7 OF THE FLORIDA BUILDING CODE SHALL BE
 VERIFIED.
  
 6. ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE DOES
 NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL OPENINGS TO
 MEET THE DEFINITION OF AN OPEN PARKING GARAGE, IT WILL
 BE CONSIDERED AN ENCLOSED PARKING GARAGE AND MUST HAVE
 EXHAUST SYSTEMS. THE EXHAUST SYSTEMS SHALL BE DESIGNED
 TO MINIMIZE NOISE LEVELS USING INLINE FAN SILENCERS OR
 OTHER APPROVED METHODS.
  
 7. GREASE INTERCEPTOR. GREASE INTERCEPTORS WILL BE
 REQUIRED. FOR INFORMATION ON THE REQUIRED TYPE, SIZE
 AND LOCATION, PLEASE CONTACT RYAN BROWN, CHIEF PLUMBING
 INSPECTOR, DEVELOPMENT SERVICES DEPARTMENT, AT (561)
 805-6692, OR BY EMAIL: [email protected]
  
 8. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS,
 GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND
 OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS,
 SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC.
  
 9. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND
 CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF
 CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL
 NEIGHBORING PROPERTIES.
  
 10. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER
 AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY,
 INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE
 CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF
 NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION
 THAT MAY AFFECT THE USE OF THEIR PROPERTY.
  
 11. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT
 WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL
 HAVE A SEPARATE ADDRESS ASSIGNED BASED ON THE LOCATION
 OF THE BUILDING ENTRANCE. FOR STREET ADDRESSING,
 CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT
 (561) 805 6659, OR BY EMAIL: [email protected]
  
 12. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT
 TO ART LIFE ASSESSMENT UNDER THE CITY OF WEST PALM
 BEACH ART IN PUBLIC PLACES (AIPP) PROGRAM. FOR ADVICE
 ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP
 ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC
 PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL:
 [email protected]
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 04-13-2022 Cont ID  
Sent By rbrown Date 04-13-2022 Time 19:13 Rev Time 0.00
Received By rbrown Date 04-13-2022 Time 19:13 Sent To  
Notes
2022-04-13 19:36:51DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR THE BUILDING PERMIT APPLICATION.
  
 2. DEMOLITION OF THE EXISTING BUILDINGS. AN ASBESTOS
 SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT
 REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH
 COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963,
 OR BY EMAIL: [email protected]
  
 3. REPLAT/UNITY OF TITLE. FOR ANY BUILDING CROSSING A
 PROPERTY LINE, EITHER A RECORDED UNITY OF TITLE, OR
 SOME OTHER APPROVED LEGAL INSTRUMENT, SHALL BE INCLUDED
 WITH THE PERMIT APPLICATION, OR THE BUILDING MUST HAVE
 A FIRE WALL ALONG THE PROPERTY LINE, PER SECTION 202 OF
 FLORIDA BUILDING CODE, BUILDING, FIRE SEPARATION
 DISTANCE.
  
 4. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT,
 THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR
 THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT,
 AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE
 FLORIDA BUILDING CODE.
  
 5. BUILDING LOCATION RELATIVE TO THE PROPERTY LINE AND
 OTHER STRUCTURES. WHEN SUBMITTED FOR BUILDING PERMIT,
 COMPLIANCE WITH ALL BUILDING SEPARATION, PERCENTAGE OF
 OPENINGS AND OPENING PROTECTIVE REQUIREMENTS OF
 CHAPTERS 6 AND 7 OF THE FLORIDA BUILDING CODE SHALL BE
 VERIFIED.
  
 6. ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE DOES
 NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL OPENINGS TO
 MEET THE DEFINITION OF AN OPEN PARKING GARAGE, IT WILL
 BE CONSIDERED AN ENCLOSED PARKING GARAGE AND MUST HAVE
 EXHAUST SYSTEMS. THE EXHAUST SYSTEMS SHALL BE DESIGNED
 TO MINIMIZE NOISE LEVELS USING INLINE FAN SILENCERS OR
 OTHER APPROVED METHODS.
  
 7. GREASE INTERCEPTOR. GREASE INTERCEPTORS WILL BE
 REQUIRED. FOR INFORMATION ON THE REQUIRED TYPE, SIZE
 AND LOCATION, PLEASE CONTACT RYAN BROWN, CHIEF PLUMBING
 INSPECTOR, DEVELOPMENT SERVICES DEPARTMENT, AT (561)
 805-6692, OR BY EMAIL: [email protected]
  
 8. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS,
 GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND
 OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS,
 SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC.
  
 9. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND
 CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF
 CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL
 NEIGHBORING PROPERTIES.
  
 10. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER
 AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY,
 INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE
 CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF
 NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION
 THAT MAY AFFECT THE USE OF THEIR PROPERTY.
  
 11. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT
 WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL
 HAVE A SEPARATE ADDRESS ASSIGNED BASED ON THE LOCATION
 OF THE BUILDING ENTRANCE. FOR STREET ADDRESSING,
 CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT
 (561) 805 6659, OR BY EMAIL: [email protected]
  
 12. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT
 TO ART LIFE ASSESSMENT UNDER THE CITY OF WEST PALM
 BEACH ART IN PUBLIC PLACES (AIPP) PROGRAM. FOR ADVICE
 ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP
 ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC
 PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL:
 [email protected]
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 11-17-2021 Cont ID  
Sent By rbrown Date 11-17-2021 Time 21:06 Rev Time 0.00
Received By rbrown Date 11-17-2021 Time 21:06 Sent To  
Notes
2021-11-17 21:08:58DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR THE BUILDING PERMIT APPLICATION.
  
 2. DEMOLITION OF THE EXISTING BUILDINGS. AN ASBESTOS
 SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT
 REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH
 COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963,
 OR BY EMAIL: [email protected]
  
 3. REPLAT/UNITY OF TITLE. FOR ANY BUILDING CROSSING A
 PROPERTY LINE, EITHER A RECORDED UNITY OF TITLE, OR
 SOME OTHER APPROVED LEGAL INSTRUMENT, SHALL BE INCLUDED
 WITH THE PERMIT APPLICATION, OR THE BUILDING MUST HAVE
 A FIRE WALL ALONG THE PROPERTY LINE, PER SECTION 202 OF
 FLORIDA BUILDING CODE, BUILDING, FIRE SEPARATION
 DISTANCE.
  
 4. EXIT TO THE STREET FROM THE EGRESS STAIRS. GROUND
 FLOOR PLAN SHEET A103 DOES NOT CLEARLY SHOW THE EXIT
 DISCHARGE POINT FROM EACH OF THE EXIT STAIRS (BUILDING
 A AND BUILDING C IN PARTICULAR). PLEASE NOTE THAT, PER
 SECTION 1028.1 OF FLORIDA BUILDING CODE, 50% OF THE
 EXIT CAPACITY SHALL DISCHARGE TO THE RIGHT OF WAY SUCH
 THAT OCCUPANTS ARE NOT REQUIRED TO TRAVERSE THE
 BUILDING AFTER LEAVING THE STAIR.
  
 5. ACCESSIBLE ROUTE. WHEN SUBMITTED FOR PERMIT, THE
 PLANS SHALL SHOW AT LEAST ONE ACCESSIBLE ROUTE,
 COMPLYING WITH SECTIONS 206.2 AND 402.2 OF FLORIDA
 ACCESSIBILITY CODE, FROM THE PUBLIC RIGHT-OF-WAY TO ALL
 ACCESSIBLE BUILDING OR FACILITY ENTRANCES.
  
 6. ANY PART OF AN ACCESSIBLE ROUTE WITH A SLOPE GREATER
 THAN 1:20 SHALL BE CONSIDERED A RAMP AND SHALL COMPLY
 WITH SECTION 405 OF FLORIDA ACCESSIBILITY CODE.
  
 7. NUMBER OF ACCESSIBLE PARKING SPACES. THE PLANS DO
 NOT SHOW ANY ACCESSIBLE PARKING AT THIS TIME. THE
 MINIMUM NUMBER OF ACCESSIBLE PARKING SPACES PROVIDED
 SHALL BE IN ACCORDANCE WITH FAIR
 HOUSING ACT AND SECTION 208.2 OF FLORIDA ACCESSIBILITY
 CODE.
  
 8. LOCATION OF ACCESSIBLE PARKING SPACES. THE PLANS DO
 NOT SHOW ANY ACCESSIBLE PARKING AT THIS TIME. PER
 SECTION 208.3 OF FLORIDA ACCESSIBILITY CODE, ACCESSIBLE
 PARKING SPACES ARE TO BE LOCATED ON THE SHORTEST
 POSSIBLE ROUTE OF TRAVEL FROM ADJACENT PARKING TO AN
 ACCESSIBLE ENTRANCE. THE DESIGN OF ACCESSIBLE PARKING
 SPACES SHALL COMPLY WITH SECTION 502 OF FLORIDA
 ACCESSIBILITY CODE
  
 9. VAN ACCESSIBLE PARKING SPACES. THE PLANS DO NOT SHOW
 ANY VAN ACCESSIBLE PARKING AT THIS TIME. PER SECTION
 208.2.4 OF FLORIDA ACCESSIBILITY CODE, ONE IN EVERY SIX
 REQUIRED ACCESSIBLE SPACES (AT LEAST ONE) IN A PARKING
 STRUCTURE, SHALL BE ?VAN ACCESSIBLE? AND DESIGNED IN
 ACCORDANCE WITH SECTION OF 502 OF FLORIDA ACCESSIBILITY
 CODE (VERTICAL CLEARANCE NOT LESS THAN 98 INCHES AT
 SPACE AND VEHICULAR ACCESS ROUTE)
  
 10. ACCESSIBLE PARKING SPACE AISLE. ACCESSIBLE PARKING
 SPACE ACCESS AISLES SHALL BE LOCATED SO THAT THE USER
 IS NOT COMPELLED TO WALK OR WHEEL BEHIND ANOTHER PARKED
 VEHICLE OR IN THE TRAVEL LANE. THE ACCESS AISLES SHALL
 ALSO COMPLY WITH THE OTHER PROVISIONS OF SECTION OF
 502.3 OF FLORIDA ACCESSIBILITY CODE.
  
 11. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT,
 THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR
 THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT,
 AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE
 FLORIDA BUILDING CODE.
  
 12. BUILDING LOCATION RELATIVE TO THE PROPERTY LINE AND
 OTHER STRUCTURES. WHEN SUBMITTED FOR BUILDING PERMIT,
 COMPLIANCE WITH ALL BUILDING SEPARATION, PERCENTAGE OF
 OPENINGS AND OPENING PROTECTIVE REQUIREMENTS OF
 CHAPTERS 6 AND 7 OF THE FLORIDA BUILDING CODE SHALL BE
 VERIFIED.
  
 13. ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE
 DOES NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL
 OPENINGS TO MEET THE DEFINITION OF AN OPEN PARKING
 GARAGE, IT WILL BE CONSIDERED AN ENCLOSED PARKING
 GARAGE AND MUST HAVE EXHAUST SYSTEMS. THE EXHAUST
 SYSTEMS SHALL BE DESIGNED TO MINIMIZE NOISE LEVELS
 USING INLINE FAN SILENCERS OR OTHER APPROVED METHODS.
  
 14. GREASE INTERCEPTOR. GREASE INTERCEPTORS WILL BE
 REQUIRED. FOR INFORMATION ON THE REQUIRED TYPE, SIZE
 AND LOCATION, PLEASE CONTACT TIM LARGE, CHIEF PLUMBING
 INSPECTOR, DEVELOPMENT SERVICES DEPARTMENT, AT (561)
 805-6692, OR BY EMAIL: [email protected]
  
 15. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS,
 GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND
 OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS,
 SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC.
  
 16. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND
 CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF
 CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL
 NEIGHBORING PROPERTIES.
  
 17. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER
 AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY,
 INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE
 CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF
 NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION
 THAT MAY AFFECT THE USE OF THEIR PROPERTY.
  
 18. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT
 WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL
 HAVE A SEPARATE ADDRESS ASSIGNED BASED ON THE LOCATION
 OF THE BUILDING ENTRANCE. FOR STREET ADDRESSING,
 CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT
 (561) 805 6659, OR BY EMAIL: [email protected]
  
 19. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT
 TO ART LIFE ASSESSMENT UNDER THE CITY OF WEST PALM
 BEACH ART IN PUBLIC PLACES (AIPP) PROGRAM. FOR ADVICE
 ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP
 ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC
 PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL:
 [email protected]
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 5 Status P Date 09-22-2022 Cont ID  
Sent By rrossano Date 09-22-2022 Time   Rev Time 0.00
Received By rrossano Date 09-22-2022 Time   Sent To  
Notes
***NONE***

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 4 Status F Date 07-19-2022 Cont ID  
Sent By rrossano Date 07-19-2022 Time   Rev Time 0.00
Received By rrossano Date 07-19-2022 Time   Sent To  
Notes
2022-07-25 07:56:07PLANS ARE DATED 5/17/22. PLEASE SUBMIT REVISED PLANS.

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 3 Status F Date 06-08-2022 Cont ID  
Sent By rrossano Date 06-08-2022 Time   Rev Time 0.00
Received By rrossano Date 06-08-2022 Time   Sent To  
Notes
2022-06-12 12:38:18COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR, ENG.
 SERVICES DEPT., 561-494-1098 [email protected] :
  
 PLEASE ADDRESS SECOND PART OF COMMENT 6: VERIFY THAT
 THERE ARE NO STRUCTURES WITHIN EASEMENT.
 PLEASE LABEL ALL STREETS AND ALLEYS ON ALL CIVIL
 SHEETS.
 DEMO SHEETS:
 UPDATE DEMO NOTE 13 TO REFER TO CITY OF WEST PALM
 BEACH.
 ADD NOTE TO ALL DEMO SHEETS TO PROTECT STORMWATER
 INLETS USING BMPS.
 PLEASE PROVIDE A SUMMARY OF SCOPE CHANGE IN THE NEXT
 RESUBMITTAL.
  
  
 COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPER., WPB PUBLIC UTILITIES, 561-494-2262 OR
 [email protected]:
  
 -SHEET C3.01. SOME CALLOUTS ARE GOING OFF TOP OF SHEET
 AND UNREADABLE. PLEASE CORRECT.
  
 -CALLOUT REPLACEMENT OF FIRE HYDRANT AND PIPE LEADING
 TO IT AT FAR NORTH SIDE OF SHEET C3.01. ALSO SHOW GATE
 VALVE AND LABEL THE FITTING AT WATER MAIN.
  
 -AT FORMAL ENGINEERING SUBMITTAL: LABEL ALL WATER
 SERVICES WITH PIPE SIZE AND MATERIAL TYPE; ADD GATE
 VALVE AT 25TH ST WHERE PROPOSED 8 INCH DIP RUNNING WEST
 TIES INTO EXISTING NORTH SOUTH DIP; LABEL EXISTING FM
 NORTH OF 25TH ST WITH PIPE SIZE AND MATERIAL TYPE; SHOW
 ALL WATER MAIN GATE VALVES AT 25TH AND PINEWOOD
 INTERSECTION; ADD INVERT AND RIM ELEVATIONS TO ALL
 EXISTING AND PROPOSED SANITARY SEWER MANHOLES; SHOW ALL
 EXISTING WATER SERVICES AND LABEL WHAT IS HAPPENING TO
 THEM (ESPECIALLY WATER SERVICE TAPS FOR NEIGHBORS THAT
 MAY RESTRICT PROPOSED TAPS); VERIFY FORCE MAIN
 DIRECTION OF FLOWL;
  
 -EXISTING 8 INCH DIP IN 25TH ST INTERSECTION SHOWS AS
 1926 8 INCH CAS IN WPB GIS. PLEASE VERIFY AT FORMAL
 ENGINEERING SUBMITTAL. IF 1926 MAY NEED TO BE REPLACED
 UPON REVIEW AND DIRECTION OF CITY OR EOR.
  
 -DCDAS ON 25TH ST ARE IN THE RIGHT OF WAY. THEY ARE
 SUPPOSED TO BE ON PRIVATE PROPERTY.
  
 -VERIFY ALL PROPOSED FDC LOCATIONS ARE ACCEPTABLE
 DISTANCE FROM FIRE HYDRANTS. SEE AT LEAST ONE THAT MAY
 NOT BE.
  
 -EXISTING SANITARY SEWER MANHOLE AND PIPING NORTH OF IT
 AT INTERSECTION OF 25TH AND PINEWOOD SAYS 1926 IN WPB
 GIS MAY NEED TO BE IMPROVED UPON REVIEW OF CITY OR EOR
 AT FORMAL ENGINEERING SUBMITTAL.
  
 -METER SIZE IS NOT CLEARLY SHOWN, BUT 3 INCH METERS
 SHOULD HAVE 4 INCH TAPS AND SERVICE LINES PER WPB
 STANDARD DETAILS.
  
 -THE NE AREA OF BROADWAY AND 25TH INTERSECTION APPEARS
 TO BE FDOT ROW.
  
 -FIRE HYDRANT GATE VALVE LOCATED ADJACENT TACTILE PAD
 ON BROADWAY. PLEASE RELOCATE. PREFER ADJACENT FIRE
 HYDRANT IN LANDSCAPING IF POSSIBLE.
  
 -CHECK POSITION OF FPL MANHOLE AT INTERSECTION OF 25TH
 AND BROADWAY TO CONFIRM WILL NOT CONFLICT WITH
 STORMWATER PIPING NEXT TO IT.
  
 -FIRELINE BACKFLOW ON 24TH ST EAST OF BROADWAY IS IN
 PEDESTRIAN TRAFFIC AND ALSO IN THE RIGHT OF WAY.
 RELOCATE TO PRIVATE PROPERTY AND OUT OF PEDESTRIAN
 TRAFFIC.
  
 -SHOW PAVEMENT RESTORATION ON 24TH ST EAST OF BROADWAY.
  
 -FIRELINE BACKFLOW ON BROADWAY IS IN RIGHT OF WAY.
 RELOCATE TO PRIVATE PROPERTY.
  
 -PAVEMENT RESTORATION BOUNDARIES ON 23RD ST ARE NOT
 SUFFICIENT FOR THE PROPOSED UTILITY WORK.
  
 -FOR FAR SOUTHWEST WATER SERVICE, WILL NEED TO GO TO
 THE MAIN. EXISTING WATER SERVICE IS SMALL DIAMETER.
  
 -EXISTING 24 INCH WATER MAIN ON 23RD ST NEAR AREAS OF
 PROPOSED WATER SERVICE TAPS IS LABELED 1926 AGE IN WPB
 GIS AND A LARGER WATER MAIN. WOULD NEED APPROVAL FROM
 MICHAEL TECHNOW TO CONNECT TO THE WATER MAINS THERE,
 AND EXISTING 24 INCH WATER MAIN MAY NEED TO BE REPLACED
 UPON REVIEW OF CITY OR EOR AT FORMAL ENGINEERING
 SUBMITTAL.
  
 -SHEET C3.03. PROPOSED WATER SERVICES AND DOMESTIC
 METER EAST OF PINEWOOD APPEAR TO BE IN CONFLICT WITH A
 UTILITY POLE.
  
 -SHOW AND LABEL UTILITY EASEMENTS FOR DOMESTIC METERED
 WATER SERVICES. MANY ARE MISSING.
  
 -FIRE HYDRANT AND PIPE TO IT WILL NEED REPLACEMENT.
 CONSIDER RELOCATING IT TO DIFFERENT LANDSCAPING AREA
 OUT OF SIDEWALK.
  
 -CALLOUT HORIZONTAL DISTANCE BETWEEN FM AND WM ON 23RD
 ST.
  
 -FOOTPRINT OF ABOVE GROUND METERS MAY BE LARGER THAN
 SHOWN ON PLANS. MAY BE NECESSARY TO ROTATE THEM OR
 INCREASE PLANTER WIDTH SO THEY WILL FIT.
  
 -THERE ARE SOME WATER UTILITY CONFLICTS WITH
 LANDSCAPING ON BROADWAY. SEE A TREE ON TOP OF A WATER
 PIPE AS WELL AS A FIRELINE BACKFLOW IN CLOSE PROXIMITY
 TO A TREE TRUNK. PLEASE CHECK PLANS FOR UTILITY
 LANDSCAPING CONFLICTS AND RESOLVE.
  
 -SHOW AND LABEL THE PROPOSED ROAD AREA BETWEEN 23RD AND
 NORTHWOOD THAT IS INTENDED TO BE DEDICATED TO THE CITY.
  
 -COULD NOT FIND ANY INFORMATION ON IRRIGATION WATER.
 WILL IRRIGATION BE FED FROM THE DOMESTIC WATER
 SERVICES?
  
 -CLEARLY SHOW AND LABEL ALL DOMESTIC BACKFLOW
 ASSEMBLIES. THEY SHOULD ALL BE ON PRIVATE PROPERTY,
 CLOSE TO METERS, OUTSIDE OF BUILDINGS, OUT OF UTILITY
 EASEMENTS, AND AWAY FROM PEDESTRIAN TRAFFIC. FOR
 IMPORTANT WATER SERVICES CONSIDER DUAL/PARALLEL
 ASSEMBLIES TO MINIMIZE WATER OUTAGES DURING BACKFLOW
 MAINTENANCE.
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 2 Status F Date 04-09-2022 Cont ID  
Sent By rrossano Date 04-09-2022 Time   Rev Time 0.00
Received By rrossano Date 04-09-2022 Time   Sent To  
Notes
2022-04-09 14:19:23Z21080015, 0017 - NORTHWOOD SQUARE, AND ABANDONMENTS
 3.30.22 SUBMITTAL
  
 PLEASE PROVIDE RESPONSES TO MY COMMENTS FROM NOV 2021
 SUBMITTAL:
  
 COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR, ENG.
 SERVICES DEPT., 561-494-1098 [email protected] :
  
 GENERAL:
 O PLEASE RESPOND TO ALL COMMENTS IN WRITING, AND
 INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER
 (Z-XXXXXXXX).
 O THE CITY OF WEST PALM BEACH HAS A NUMBER OF
 REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY
 AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND
 WASTEWATER UTILITIES WITHIN THE CITY. PLEASE SEE
 DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AT THE LINK
 BELOW:
 A. HTTP://WPB.ORG/CMSPAGES/GETAMAZONFILE.ASPX?PATH=~\WP
 B_WEBSITE\MEDIA\ENGINEERING\DEVELOPMENT-APPLICATION-FUL
 L-PACKAGE_2016.PDF&HASH=7BD4DD7EB6115181D8C5977BCC02A97
 B1960045731D3658206F27451722716EF
 B. THIS AND OTHER RELATED ENGINEERING DOCUMENTS CAN BE
 FOUND HERE:
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
 C. ALSO SEE: CODE OF ORDINANCES, CITY OF WEST PALM
 BEACH, FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08,
 ADOPTED SEPT. 22, 2008. (SUPPLEMENT NO. 18)
 CHAPTER 90 UTILITIES, ARTICLE I. IN GENERAL,
 SEC. 90-7. POLICY REGARDING EXTENSION OF WATER OR SEWER
 SERVICE FACILITIES OF THE CITY.
 THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE
 CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY
 BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS,
 BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION.
 O AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR
 MORE INFORMATION, REFER TO THE LINK BELOW:
 A. HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PU
 BLICATIONS/BACKFLOW-CROSS-CONNECTION- CONTROL-MANUAL
 O PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY
 OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC
 RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF
 YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE
 MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL
 IN THE WPB ENGINEERING SERVICES DEPARTMENT AT
 [email protected] OR 561-494-1079 FOR FURTHER
 ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION
 ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD
 SURVEY, POT-HOLING, SOFT DIGS ETC.
  
 BACKFLOW ASSEMBLY AND METERS:
  
 O SHOW AND LABEL ANY EXISTING OR PROPOSED WATER
 SERVICES AND WATER METERS FOR THE PARKING LOTS, ALONG
 WITH WHAT IS HAPPENING TO THEM.
 O SHOW EXISTING AND PROPOSED DEDICATED UTILITY
 EASEMENTS TO ALLOW ACCESS FOR CITY PERSONNEL TO
 PROPOSED UTILITY WATER METERS. VERIFY THAT THERE ARE NO
 STRUCTURES WITHIN EASEMENT.
 O PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED LOCATION
 OF WATER METER AND BACKFLOW
 PREVENTION.
 O BACKFLOWS SHALL BE INSTALLED ON PRIVATE PROPERTY
 OUTSIDE OF EASEMENTS AND RIGHTS OF WAY. DOMESTIC WATER
 METERS SHALL BE INSTALLED IMMEDIATELY ADJACENT TO
 PROPERTY LINE. 3 INCH AND LARGER WATER METERS SHALL BE
 INSTALLED ABOVE-GROUND ONLY.
 O CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA (MAKE
 NOTE USC APPROVED) AND FIRE BACKFLOW PREVENTER AS DCDA.
  
 WATER/WASTEWATER PLAN:
 O PROVIDE VERTICAL DATUM AND DATUM CONVERSION
 INFORMATION (NAVD 1988 AND NGVD 1929).
 O SHOW PROJECT ADDRESS ON ALL PLAN SHEETS.
 O PROVIDE LEGEND ON ALL PLAN SHEETS TO INCLUDE
 STREETLIGHT, SIGN POSTS, TRANSFORMER BOXES ETC.
 O PLANS SHALL SHOW EXISTING AND PROPOSED LOCATIONS AND
 DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND
 SEWER LINES AND CLEANOUTS, INCLUDING STUBS TO EACH
 PROPERTY LINE FOR WATER AND SANITARY SEWERS, THE MAKE
 AND MODEL OF ALL VALVES, POTABLE AND IRRIGATION METERS,
 BACKFLOWS, FIRE HYDRANTS AND FDCS, AND OTHER DEVICES TO
 BE INSTALLED ON THE SYSTEM, CATCH BASINS, CULVERTS,
 DITCHES INCLUDING GRADES, PIPES SIZES, MATERIALS,
 ELEVATIONS, ASSUMPTIONS, CALCULATIONS, INVERT
 ELEVATIONS FOR ALL INLETS AND MANHOLES AND PROFILES OF
 SANITARY SEWER LINES.
 O GATE VALVE BOXES SHALL NOT BE INSTALLED IN CURB OR
 SIDEWALK. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE
 PROFILE VIEW.
 O DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN
 VIEW FOR ALL SANITARY AND STORM SEWERS.
 O SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL.
 O PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED
 UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC,
 ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION
 FACILITIES LOCATED ON THE RIGHT-OF-WAY.
 O PROVIDE PROFILE AND CLEARANCES BETWEEN WATER, SEWER
 AND STORM LINES PER CITY OF WEST PALM BEACH STANDARD
 DETAIL GN-2 SERIES, AT ALL UTILITY CROSSINGS.
 O SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE DIRECTLY
 TO ENGINEERING (SHEET 33 OF CITY OF WPB DEVELOPMENT
 APPLICATION). PROVIDE CALCULATIONS ON PLANS OF EXISTING
 AND PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE,
 MAXIMUM AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS
 SHALL BE PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008
 FOR WATER.
 O PROVIDE FIRE FLOW TEST DATA.
 O PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND
 STORMWATER INFRASTRUCTURE ALONG ENTIRE PROJECT
 FRONTAGE.
 O CUT AND CAP UTILITIES NOT IN USE AND REMOVE ANY
 ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY
 ROW.
 O WHEN PROPOSED, WATER MAINS IN CITY RIGHT OF WAY SHALL
 BE MADE OF DUCTILE IRON PIPE (NOT PVC) AND SPECIFY
 PROPOSED LENGTH IN FEET.
 O CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY
 SEWER ARE REQUIRED.
 O PROVIDE CLEANOUTS FOR PROPOSED SANITARY LINE ONSITE
 JUST INSIDE PROPERTY LINE, AT JOINTS AND EVERY 75 FEET.
 O ADD NOTE TO PLANS SPECIFYING CITY?S DOWNSTREAM LIFT
 STATION NUMBER.
 O PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR
 PROPOSED SANITARY LATERALS.
 O LABEL WATER LINES AS PRIVATE WHERE APPLICABLE.
 O PLEASE SHOW AND LABEL EXISTING AND PROPOSED GREASE
 TRAPS (IF ANY).
 O PER CITY STANDARDS MAINTAIN MINIMUM DISTANCE BETWEEN
 OUTSIDE DIAMETER OF CITY PIPE AND ROOT BARRIER.
  
 FORMAL ENGINEERING REVIEW:
 O FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND NPDES
 NOI REQUIREMENTS WILL BE ENFORCED.
 - AN NOI IS REQUIRED FOR PROJECTS THAT:
 - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS
 THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF
 DEVELOPMENT OR SALE;
 - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE
 STATE OR TO SURFACE WATERS OF THE STATE THROUGH A
 MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4).
 - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF
 CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION
 THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL
 SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT
 OF THE 10-2 CERTIFICATION.
 O FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 EASEMENT FOR PLACEMENT OF PROPOSED WATER METERS.
 O FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES OF
 WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS.
 O FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING
 APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT
 SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING
 SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED
 LEAD-FREE DESIGN.
 O FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY LINES
 ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY
 LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT
 PARCELS.
 O FOR FORMAL ENGINEERING SUBMITTAL, IF WATER LINES ARE
 BEING REPLACED IN ROW, SHOW ADJACENT PARCEL ADDRESSES.
 O FOR FORMAL ENGINEERING SUBMITTAL, ADD NOTE TO PROVIDE
 50 FT. PAVEMENT RESTORATION TRANSITION ON EACH SIDE OF
 PROPOSED TRENCH IN CITY MAINTAINED ROADWAY AREAS PER
 CITY OF WPB STANDARD DETAIL GC-8.
 O FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 CALCULATIONS OF PERVIOUS AND IMPERVIOUS AREAS FOR
 PROPOSED IMPROVED AREAS.
  
 MARK HURLEY, FIELD CUSTOMER SERVICE SUPERVISOR WITH
 CITY OF WPB PUBLIC UTILITIES, 561-494-2262 OR
 [email protected] :
  
 -PINEWOOD AVE VACATION LEGAL DESCRIPTION STATES THAT
 THE LANDS ARE IN MONROE COUNTY FLORIDA. PLEASE VERIFY
 IT IS WORDED CORRECTLY OR UPDATE.
  
 -A0.02 SAYS 360 UNITS, BUT LOS ANALYSIS SAYS 370 UNITS.
 PLEASE VERIFY BOTH AND UPDATE AS NEEDED.
  
 -SHOW AND LABEL PROPOSED AND EXISTING SIDEWALK
 EASEMENTS ON CIVIL PLANS. SOME ADDITIONAL MAY BE
 REQUIRED.
  
 -ARE THERE ANY OUTSIDE ADA PARKING SPOTS? IF NOT, ARE
 ANY NEEDED OR REQUIRED?
  
 -A301 SHOWS GREENSPACE ISLANDS IN SOUTHWEST OUTSIDE
 PARKING LOT BUT PGD PLAN DOES NOT. PLEASE MAKE SURE ALL
 PLANS MATCH GENERAL DESIGN LAYOUT.
  
 -A301 HAS SOME HATCHED 20FT BY 20FT TRIANGLES. PLEASE
 IDENTIFY THEM IN LEGEND. IF THEY ARE SIGHT TRIANGLES,
 IS IT ALRIGHT FOR THE TREES TO BE IN THEM?
  
 -ON A402 AND A403 PLEASE CALLOUT DIMENSIONS OF PARKING
 GARAGE ENTRANCE.
  
 -ON A404 PLEASE CALLOUT DIMENSIONS OF BROADWAY AVE
 TUNNELS
  
 -CIVIL PLANS NOT SIGNED, SEALED, AND DATED.
  
 -ON C1.04 BETWEEN 550 AND 540 NORTHWOOD, DEMO PLAN SAYS
 PARTY WALL. IF THAT IS A SHARED WALL, PLEASE HIGHLIGHT
 BETTER AND ALSO INDICATE IF WALL WILL REMAIN OR BE
 REPLACED.
  
 -ON C3.01 IS THE INTENT FOR THE PROPOSED 8 INCH PVC
 WATER MAIN TO BE PRIVATELY OWNED AND MAINTAINED OR CITY
 OWNED AND MAINTAINED?
  
 -CITY OWNED WATER MAINS AND WATER SERVICES LARGER THAN
 2 INCHES SHOULD BE DIP.
  
 -CALLOUT BACKFLOW ASSEMBLIES AND WATER METERS. ADD SIZE
 TO LABEL.
  
 -C3.01 SOUTHWEST BUILDING A FIRE AND WATER SERVICE
 LABELS APPEAR TO BE REVERSED. FIRELINE BACKFLOW
 ASSEMBLY ALSO LOOKS CLOSE TO PARKING SPOT TRAFFIC. MAY
 NEED INCREASE DISTANCE TO PREVENT DAMAGE.
  
 -WATER SERVICE LABELS ARE AMBIGUOUS AS TO WHICH
 PORTIONS ARE PRIVATE. ALSO UNCLEAR AS TO SIZING WHEN
 SAYING 3 INCH BUT THE TAP IS FOUR INCHES AND REQUIRED
 PIPING WOULD BE AT LEAST 4 INCHES.
  
 -FOR ANY PROPOSED WATER METERS LARGER THAN 2 INCHES,
 ADD WORDING ABOVE GROUND TO LABELS.
  
 -C3.01: ADD SMALL CIRCULAR OBJECTS IN SIDEWALK TO
 LEGEND AND IDENTIFY THEM.
  
 -ENSURE ARCHITECTURAL PLANS COMPLY WITH NOTE 21 ON
 UTILITY PLAN REGARDING VERTICAL CLEARANCE DISTANCES.
  
 -NOTE 20 ON UTILITY PLAN DOES NOT SEEM TO MAKE SENSE. A
 DDCV IS A TYPE OF BACKFLOW PREVENTER.
  
 -NOTE 14 ON UTILITY PLAN: VERIFY IF THERE WILL BE ANY
 COUNTY UTILITIES IN PROJECT AREA. IF NOT, THEN REVISE
 OR REMOVE.
  
 -FIRELINE BACKFLOW ASSEMBLY LOCATIONS WOULD ONLY BE
 ACCEPTABLE IF ROW IS ABANDONED AND AREA IS PRIVATELY
 OWNED.
  
 -BACKFLOW ASSEMBLIES FOR DOMESTIC METERED WATER
 SERVICES APPEAR TO BE MISSING. THEY SHOULD BE OUTSIDE
 OF BUILDING, ADJACENT PROPERTY LINE, ON PRIVATE
 PROPERTY, WITH DISTANCE MINIMIZED TO METER, BUT NOT
 LOCATED IN SIDEWALK PEDESTRIAN TRAFFIC. CLEARLY SHOW
 AND LABEL THEM.
  
 -FOR FIRELINE BACKFLOW ASSEMBLY AT NORTHEAST BUILDING
 OFF BROADWAY, ATTEMPT TO RELOCATE SLIGHTLY NORTH TO
 REDUCE PIPE DISTANCE. IF CANNOT EXPLAIN CONFLICT.
  
 -C3.02: FDC NEEDS TO BE ON PRIVATE PROPERTY AND OUT OF
 PEDESTRIAN TRAFFIC AS WELL AS NOT IMPEDING VEHICLE
 DOORS. IT MUST ALSO BE CLEARLY VISIBLE AND TYPICALLY
 REQUIRES SIGNAGE.
  
 -C3.02: FIRELINE BACKFLOW ASSEMBLY LOOKS TO CONFLICT
 WITH CURB OR GUTTER AND IS CLOSE TO VEHICLES.
  
 -C3.03: PROPOSED 24 INCH WATER MAIN SHOULD BE DIP
 INSTEAD OF PVC; ADD 24 INCH VALVES AT 24 INCH TEES IN
 OFFSET DIRECTIONS;
  
 -ADD NOTE ON UTILITY PLAN SHEETS THAT LINESTOPS OR
 INSERTION VALVES MAY BE REQUIRED AS DIRECTED BY CITY OF
 WEST PALM BEACH UTILITIES OR ENGINEER OF RECORD TO
 MINIMIZE WATER OUTAGES.
  
 -THERE ARE SOME DOORS THAT OPEN TO PLAZA CLOSE TO A
 LANDSCAPING AREA THAT WOULD SEEM TO BLOCK PEDESTRIAN
 MOVEMENT. IS THAT ALRIGHT?
  
 -BUILDING B EAST FIRELINE LABELED 6 BY 4, BUT SHOULD BE
 8 BY 4; ALSO SHOW AND LABEL DOMESTIC BACKFLOW ASSEMBLY;
 UTILITY EASEMENT FOR METER NOT SHOWN AND LABELED.
  
 -VERIFY BUILDING B WEST FDC LOCATION IS ACCEPTABLE WITH
 WPB PLANNING. ALSO VERIFY BUILDING C SOUTH FDC LOCATION
 WITH THEM.
  
 -BUILDING C 4 INCH WATER MAIN DOES NOT DEADEND PER WPB
 GIS. PLEASE VERIFY AND UPDATE UTILITY PLAN AS NEEDED.
  
 -BUILDING CS CANNOT HAVE BACKFLOW ASSEMBLIES IN RIGHT
 OF WAY. NEEDS TO BE ON PRIVATE PROPERTY.
  
 -DID NOT SEE FIRELINES WITH DCDAS FOR BUILDING CS.
 VERIFY THEY ARE NOT NEEDED OR REQUIRED FOR THESE
 BUILDINGS OVER 2 STORIES.
  
 -ARE ANY WERE LATERALS MISSING FOR BUILDINGS ON WEST
 SIDE OF BROADWAY?
  
 -APPLICANT MUST FOLLOW ALL RULES REGARDING SUBMETERING
 AND REMETERING
  
 -THERE ARE SPECIAL REQUIREMENTS AND RESTRICTIONS
 REGARDING PLUMBING CROSSING RIGHT OF WAYS AND STREETS.
  
 -NOTE 16 MENTIONED A LIFT STATION. ARE THERE ANY
 PROPOSED LIFT STATIONS FOR THIS PROJECT?
  
 -VERIFY ALL REQUIRED PAVEMENT RESTORATION FROM UTILITY
 WORK IS SHOWN. LOOKS LIKE THERE IS AT LEAST SOME
 MISSING ON 25TH ST.
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status F Date 11-17-2021 Cont ID  
Sent By rrossano Date 11-17-2021 Time   Rev Time  
Received By rrossano Date 11-17-2021 Time   Sent To  
Notes
2021-11-17 13:11:07COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR, ENG.
 SERVICES DEPT., 561-494-1098 [email protected] :
  
 GENERAL:
 O PLEASE RESPOND TO ALL COMMENTS IN WRITING, AND
 INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER
 (Z-XXXXXXXX).
 O THE CITY OF WEST PALM BEACH HAS A NUMBER OF
 REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY
 AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND
 WASTEWATER UTILITIES WITHIN THE CITY. PLEASE SEE
 DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AT THE LINK
 BELOW:
 A. HTTP://WPB.ORG/CMSPAGES/GETAMAZONFILE.ASPX?PATH=~\WP
 B_WEBSITE\MEDIA\ENGINEERING\DEVELOPMENT-APPLICATION-FUL
 L-PACKAGE_2016.PDF&HASH=7BD4DD7EB6115181D8C5977BCC02A97
 B1960045731D3658206F27451722716EF
 B. THIS AND OTHER RELATED ENGINEERING DOCUMENTS CAN BE
 FOUND HERE:
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
 C. ALSO SEE: CODE OF ORDINANCES, CITY OF WEST PALM
 BEACH, FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08,
 ADOPTED SEPT. 22, 2008. (SUPPLEMENT NO. 18)
 CHAPTER 90 UTILITIES, ARTICLE I. IN GENERAL,
 SEC. 90-7. POLICY REGARDING EXTENSION OF WATER OR SEWER
 SERVICE FACILITIES OF THE CITY.
 THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE
 CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY
 BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS,
 BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION.
 O AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR
 MORE INFORMATION, REFER TO THE LINK BELOW:
 A. HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PU
 BLICATIONS/BACKFLOW-CROSS-CONNECTION- CONTROL-MANUAL
 O PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY
 OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC
 RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF
 YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE
 MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL
 IN THE WPB ENGINEERING SERVICES DEPARTMENT AT
 [email protected] OR 561-494-1079 FOR FURTHER
 ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION
 ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD
 SURVEY, POT-HOLING, SOFT DIGS ETC.
  
 BACKFLOW ASSEMBLY AND METERS:
  
 O SHOW AND LABEL ANY EXISTING OR PROPOSED WATER
 SERVICES AND WATER METERS FOR THE PARKING LOTS, ALONG
 WITH WHAT IS HAPPENING TO THEM.
 O SHOW EXISTING AND PROPOSED DEDICATED UTILITY
 EASEMENTS TO ALLOW ACCESS FOR CITY PERSONNEL TO
 PROPOSED UTILITY WATER METERS. VERIFY THAT THERE ARE NO
 STRUCTURES WITHIN EASEMENT.
 O PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED LOCATION
 OF WATER METER AND BACKFLOW
 PREVENTION.
 O BACKFLOWS SHALL BE INSTALLED ON PRIVATE PROPERTY
 OUTSIDE OF EASEMENTS AND RIGHTS OF WAY. DOMESTIC WATER
 METERS SHALL BE INSTALLED IMMEDIATELY ADJACENT TO
 PROPERTY LINE. 3 INCH AND LARGER WATER METERS SHALL BE
 INSTALLED ABOVE-GROUND ONLY.
 O CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA (MAKE
 NOTE USC APPROVED) AND FIRE BACKFLOW PREVENTER AS DCDA.
  
 WATER/WASTEWATER PLAN:
 O PROVIDE VERTICAL DATUM AND DATUM CONVERSION
 INFORMATION (NAVD 1988 AND NGVD 1929).
 O SHOW PROJECT ADDRESS ON ALL PLAN SHEETS.
 O PROVIDE LEGEND ON ALL PLAN SHEETS TO INCLUDE
 STREETLIGHT, SIGN POSTS, TRANSFORMER BOXES ETC.
 O PLANS SHALL SHOW EXISTING AND PROPOSED LOCATIONS AND
 DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND
 SEWER LINES AND CLEANOUTS, INCLUDING STUBS TO EACH
 PROPERTY LINE FOR WATER AND SANITARY SEWERS, THE MAKE
 AND MODEL OF ALL VALVES, POTABLE AND IRRIGATION METERS,
 BACKFLOWS, FIRE HYDRANTS AND FDCS, AND OTHER DEVICES TO
 BE INSTALLED ON THE SYSTEM, CATCH BASINS, CULVERTS,
 DITCHES INCLUDING GRADES, PIPES SIZES, MATERIALS,
 ELEVATIONS, ASSUMPTIONS, CALCULATIONS, INVERT
 ELEVATIONS FOR ALL INLETS AND MANHOLES AND PROFILES OF
 SANITARY SEWER LINES.
 O GATE VALVE BOXES SHALL NOT BE INSTALLED IN CURB OR
 SIDEWALK. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE
 PROFILE VIEW.
 O DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN
 VIEW FOR ALL SANITARY AND STORM SEWERS.
 O SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL.
 O PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED
 UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC,
 ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION
 FACILITIES LOCATED ON THE RIGHT-OF-WAY.
 O PROVIDE PROFILE AND CLEARANCES BETWEEN WATER, SEWER
 AND STORM LINES PER CITY OF WEST PALM BEACH STANDARD
 DETAIL GN-2 SERIES, AT ALL UTILITY CROSSINGS.
 O SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE DIRECTLY
 TO ENGINEERING (SHEET 33 OF CITY OF WPB DEVELOPMENT
 APPLICATION). PROVIDE CALCULATIONS ON PLANS OF EXISTING
 AND PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE,
 MAXIMUM AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS
 SHALL BE PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008
 FOR WATER.
 O PROVIDE FIRE FLOW TEST DATA.
 O PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND
 STORMWATER INFRASTRUCTURE ALONG ENTIRE PROJECT
 FRONTAGE.
 O CUT AND CAP UTILITIES NOT IN USE AND REMOVE ANY
 ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY
 ROW.
 O WHEN PROPOSED, WATER MAINS IN CITY RIGHT OF WAY SHALL
 BE MADE OF DUCTILE IRON PIPE (NOT PVC) AND SPECIFY
 PROPOSED LENGTH IN FEET.
 O CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY
 SEWER ARE REQUIRED.
 O PROVIDE CLEANOUTS FOR PROPOSED SANITARY LINE ONSITE
 JUST INSIDE PROPERTY LINE, AT JOINTS AND EVERY 75 FEET.
 O ADD NOTE TO PLANS SPECIFYING CITY?S DOWNSTREAM LIFT
 STATION NUMBER.
 O PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR
 PROPOSED SANITARY LATERALS.
 O LABEL WATER LINES AS PRIVATE WHERE APPLICABLE.
 O PLEASE SHOW AND LABEL EXISTING AND PROPOSED GREASE
 TRAPS (IF ANY).
 O PER CITY STANDARDS MAINTAIN MINIMUM DISTANCE BETWEEN
 OUTSIDE DIAMETER OF CITY PIPE AND ROOT BARRIER.
  
 FORMAL ENGINEERING REVIEW:
 O FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND NPDES
 NOI REQUIREMENTS WILL BE ENFORCED.
 - AN NOI IS REQUIRED FOR PROJECTS THAT:
 - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS
 THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF
 DEVELOPMENT OR SALE;
 - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE
 STATE OR TO SURFACE WATERS OF THE STATE THROUGH A
 MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4).
 - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF
 CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION
 THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL
 SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT
 OF THE 10-2 CERTIFICATION.
 O FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 EASEMENT FOR PLACEMENT OF PROPOSED WATER METERS.
 O FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES OF
 WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS.
 O FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING
 APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT
 SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING
 SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED
 LEAD-FREE DESIGN.
 O FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY LINES
 ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY
 LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT
 PARCELS.
 O FOR FORMAL ENGINEERING SUBMITTAL, IF WATER LINES ARE
 BEING REPLACED IN ROW, SHOW ADJACENT PARCEL ADDRESSES.
 O FOR FORMAL ENGINEERING SUBMITTAL, ADD NOTE TO PROVIDE
 50 FT. PAVEMENT RESTORATION TRANSITION ON EACH SIDE OF
 PROPOSED TRENCH IN CITY MAINTAINED ROADWAY AREAS PER
 CITY OF WPB STANDARD DETAIL GC-8.
 O FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 CALCULATIONS OF PERVIOUS AND IMPERVIOUS AREAS FOR
 PROPOSED IMPROVED AREAS.
  
 QUESTIONS AND COORDINATION CONTACTS:
 O MARK HURLEY, FIELD CUSTOMER SERVICE SUPERVISOR WITH
 CITY OF WPB PUBLIC UTILITIES, REGARDING PLACEMENT OF
 BACKFLOW DEVICES AND WATER METERS. CONTACT HIM AT
 561-494-2262 OR [email protected]
 O RICK ROSSANO, SR. PROJECT COORDINATOR, ENGINEERING
 SERVICES DEPARTMENT AT 561-494-1098 [email protected]
 O MIKE TECHNOW, PROJECT ENGINEER, PUBLIC UTILITIES
 DEPARTMENT AT 561-494-1047 OR [email protected]
 O TRACY WARD, SR. STORMWATER ENGINEER, ENGINEERING
 SERVICES DEPT. AT 561-494-1120 OR [email protected]
  
  
 COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPER., WPB PUBLIC UTILITIES, 561-494-2262 OR
 [email protected]:
  
 -THERE ARE MANY MONITORING WELLS AS SHOWN ON THE
 SURVEY. WILL THEY REMAIN?
  
 -FOR EASTERN BUILDING NUMBER 4 ON UTILITY PLAN: THE
 LEADER LINES FOR THE WATER SERVICES APPEAR TO BE
 POINTING WRONG; METER BOX SHOULD NOT BE IN
 SIDEWALK/HARDSCAPE; BACKFLOW ASSEMBLIES NOT ALLOWED IN
 PROPOSED LOCATION UNLESS SIDEWALK ENDS IMMEDIATELY EAST
 OF BACKFLOW ASSEMBLIES AND WILL NOT BE CONTINUED;
 UTILITY EASEMENT REQUIRED FOR WATER METER AND UPSTREAM
 PIPING; SEWER LATER IS CLOSE TO TREE PLANTER; DISTANCE
 CALLOUT NEEDED BETWEEN SEWER LATERAL AND WATER SERVICE.
  
 -UTILITY PLANS SHOW MULTIPLE BUILDINGS LABELED AS
 NUMBER 4.
  
 -SEWER LATERAL FOR WESTERN BUILDING NUMBER 4 HAS SEWER
 LATERAL RUNNING THROUGH TREE PLANTER.
  
 -ARE CROSS WALKS NEEDED AT NEW INTERSECTION OF BROADWAY
 AND 23RD? (EITHER EAST-WEST OR NORTH-SOUTH)
  
 -EXISTING TRAFFIC SIGN AT NORTHWEST INTERSECTION OF
 BROADWAY AND 23RD IS IN CLOSE PROXIMITY TO PROPOSED
 STORMWATER UTILITY.
  
 -PROPOSED TREE PLANTER ON 23RD STREET IS CONFLICTING
 WITH LARGE UTILITY POLE.
  
 -ALL OF THE SEWER MAINS IN THE AREA ARE OLDER AND MAY
 REQUIRE UPGRADE OR REPLACEMENT AS ADVISED BY ENGINEER
 OF RECORD AND/OR CITY OF WEST PALM BEACH.
  
 -SHEET C3.10, REPLACE STANDARD DETAIL WS-4 WITH WS-3.
 METERS 3 INCHES OR LARGER NEED TO BE ABOVE-GROUND
 INSTALLED.
  
 -SUBMIT SEPARATE LANDSCAPING PLAN SHOWING ALL EXISTING
 AND PROPOSED TREES. ON ONE OF THE PLAN SHEETS HAVE
 LANDSCAPING OVERLOAD ON UTILITIES SO CAN RECOGNIZE ANY
 CONFLICTS.
  
 -ON NORTH SIDE OF WESTERN BUILDING 4, DO PLANTERS
 PREVENT WALKING ALONG SIDEWALK?
  
 -SOME CANOPY OVERHANGS ON NORTHWOOD APPEAR TO EXTEND
 INTO ROW. PLEASE VERIFY THAT IS ACCEPTABLE.
  
 -ADD PRIVATE TO LABEL OF ANY PRIVATELY OWNED AND
 MAINTAINED UTILITY INFRASTRUCTURE.
  
 -DID NOT SEE ANY FDC. ARE ANY NEEDED OR REQUIRED?
  
 -UTILITY PLAN SHOWS STREET SIGN, UTILITY POLE, AND GUY
 WIRES IN SIDEWALK AT NORTHWEST INTERSECTION OF PINEWOOD
 AND 23RD.
  
 -SIDEWALK EASEMENT MAY BE REQUIRED FOR NORTHSIDE OF
 23RD ST.
  
 -ADJUST LOCATION OF FIRE HYDRANT AT NORTHWOOD AND
 PINEWOOD INTERSECTION SUCH THAT IT DOES NOT ENCROACH IN
 SIDEWALK AND HAS MORE CLEARANCE DISTANCE FROM
 STORMWATER UTILITY.
  
 -BACKFLOW ASSEMBLIES MUST BE LOCATED ON PRIVATE
 PROPERTY. CANNOT BE ONLY IN RIGHT OF WAY.
  
 -ENSURE FIRELINE BACKFLOW ASSEMBLY LOCATIONS ARE NFPA
 COMPLIANT.
  
 -ADD PROPOSED METER SIZING. IF METERS ARE 3 INCHES OR
 LARGER, THE SCALE FOOTPRINT IS LIKELY MUCH SMALLER THAN
 WHEN BUILT OUT AND WOULD CONFLICT WITH PROPOSED
 LOCATIONS.
  
 -LABEL ALL EXISTING AND PROPOSED FIRE HYDRANTS. SEE AT
 LEAST ONE MISSING LABELING.
  
 -FIRE HYDRANT AT BROADWAY AND 24TH MAY NOT MEET
 STANDARD DETAIL CLEARANCE REQUIREMENTS IF A TREE IS
 PLANTED NEAR IT.
  
 -SHOW AND LABEL ALL EXISTING WATER SERVICE LINES, METER
 BOXES, METERS, SEWER LATERALS, BACKFLOW ASSEMBLIES IN
 THE PROJECT AREA AND LABEL WHAT IS HAPPENING TO THEM.
 SEE MANY NOT SHOWN AND/OR LABELED.
  
 -BUILDING 3 FIRELINE CONFLICTS WITH A MONITORING WELL.
  
 -8 INCH FIRELINE: IS MISSING POINT OF SERVICE GATE
 VALVE; CONFLICTING WITH SOME KIND OF UTILITY BOX; IS IN
 MIDDLE OF SIDEWALK; DOES NOT HAVE PIPE DISTANCE
 MINIMIZED BETWEEN BACKFLOW ASSEMBLY AND WATER MAIN.
  
 -UTILITY PLAN SHOWS STREET SIGN IN PROPOSED PARKING
 SPOT AT BUILDING 2.
  
 -PROPOSE SEWER MANHOLE NEAR BUILDING 2 IS HALF IN
 STREET AND SIDEWALK MAKING MAINTENANCE MORE DIFFICULT.
 ALSO IF PRIVATE ADD TO LABEL.
  
 -TREE OR BUSH BLOCKING DRIVEWAY OF BUILDING 2 ON
 UTILITY PLAN.
  
 -THERE ARE SMALL CIRCULAR OBJECTS ON UTILITY PLAN NEAR
 PARKING SPOTS. IF THEY ARE BOLLARDS ADD TO LEGEND OR
 LABEL THEM.
  
 -WATER MAIN IN PINEWOOD IS OLDER AND MAY REQUIRE
 UPGRADE OR REPLACEMENT AS ADVISED BY ENGINEER OF RECORD
 AND/OR CITY OF WEST PALM BEACH.
  
 -23RD ST IS ONE-WAY GOING WEST UNTIL PINEWOOD. MAKE
 SURE PLANS ACCOUNT FOR THE ONE-WAY DRIVING DIRECTION.
  
 -SHOW LOCATIONS OF PROPOSED TRANSFORMER PADS WHEREVER
 OVERHEAD ELECTRIC UTILITIES ARE BEING UNDERGROUNDED.
  
 -SHOW ALL EXISTING DRIVEWAY APPROACHES AND LABEL ANY
 THAT ARE BEING REMOVED ON THE DEMO PLANS. FOR EXAMPLE,
 CANNOT TELL WHAT IS HAPPENING TO THE DRIVEWAY APPROACH
 AT 23RD ON THE SOUTH SIDE OF 701 23RD ST.
  
 -PLEASE MAKE SURE CURB TYPES ARE LABELED ON ALL SHEETS
 OF THE PAVING, GRADING, AND DRAINAGE PLANS.
  
 -REMOVAL, RELOCATION, OR ALTERATION OF CITY WPB METERED
 WATER SERVICES AND BACKFLOW ASSEMBLIES IN PROJECT AREA
 WOULD REQUIRE APPROVAL FROM ASSOCIATED DEPARTMENT
 REPRESENTATIVES. THEY TYPICALLY REQUIRE PROJECT TO PAY
 ANY ASSOCIATED UTILITY BILLING CHARGES OR FEES.
  
 -ADD WATER DEMAND CALCULATIONS TO UTILITY PLAN SHEETS.
  
 -EASEMENTS MAY BE REQUIRED FOR BUILDING STRUCTURES
 CROSSING RIGHT OF WAY.
  
 -PROVIDE VERTICAL CLEARANCE DISTANCE FOR ANY STRUCTURES
 OVER STREETS, AND ENSURE LARGE UTILITY VEHICLES SUCH AS
 VACUUM TRUCKS WILL HAVE SUFFICIENT CLEARANCE.
  
 -ON DEMO PLAN LABEL WHAT IS HAPPENING TO THE LARGE
 UTILITY POLES AT THE NORTHWEST CORNER OF BUILDING 1
 LOADING DRIVEWAY.
  
 -SOME OF THE VEHICLE MOVEMENTS AND SIGNAGE ARE NOT
 CLEAR FROM THE PLANS. FOR EXAMPLE, HOW WILL DRIVERS
 HEADING EAST ON 25TH KNOW NOT TO PULL INTO LOADING BAY
 FOR BUILDING 1. HOW WILL TRUCKS BACK UP INTO THAT BAY
 WITHOUT CREATING TRAFFIC PROBLEMS?
  
 -WATER UTILITIES ON 24TH ST BETWEEN PINEWOOD AND
 BROADWAY SHOULD BE REMOVED OR RELOCATED.
  
 -SHOW ALL GREASE TRAPS/INTERCEPTORS.
  
 -PROPOSED CURB DESIGN ON EAST SIDE OF PINEWOOD MAKES
 EXCAVATION AND MAINTENANCE OF EXISTING WATER MAIN
 DIFFICULT.
  
 -ALLEY BETWEEN 24TH AND NORTHWOOD HAS OVERHEAD
 UTILITIES WITH POLES THAT LOOK TO CONFLICT WITH
 PROPOSED BUILDINGS.
  
 -BUILDING 6 METERED WATER SERVICE NEEDS UTILITY
 EASEMENT SHOWN AND LABELED. VERIFY AREA AROUND METER
 BOX WILL BE LANDSCAPING AND NOT HARDSCAPE.
  
 -BUILDING 5 METERED WATER SERVICE NEEDS A UTILITY
 EASEMENT IF ON PRIVATE PROPERTY. METER BOX SHOULD NOT
 BE IN HARDSCAPE. METER BOX AND BACKFLOW ASSEMBLY SHOULD
 NOT BE IN MIDDLE OF SIDEWALK TRAFFIC.
  
 -THERE IS A LOT OF GAS UTILITIES BUT NOT SHOWING ON
 UTILITY PLANS. PLEASE SHOW ALL FRANCHISE AND DRY
 UTILITIES.
  
 -SEWER CLEANOUT FOR BUILDING 5 IS IN FRONT OF DOOR
 CREATING MAINTENANCE CONFLICT.
  
 -DID NOT SEE DEDICATED FIRELINES FOR BUILDINGS ON WEST
 SIDE OF PINEWOOD. ARE ANY NEEDED OR REQUIRED?
  
 -SHOW PAVEMENT RESTORATION BOUNDARIES FOR ALL UTILITY
 WORK INCLUDING 25TH ST AND 23RD ST. MAKE SURE THE
 BOUNDARIES COMPLY WITH DISTANCE REQUIREMENTS ON
 STANDARD DETAILS.
  
 -IS THE NEW CONNECTING ROAD BETWEEN NORTHWOOD AND 23RD
 INTENDED FOR PUBLIC USE? ARE ANY EASEMENTS NEEDED FOR
 IT SINCE ON PRIVATE PROPERTY? VERIFY IT WILL BE
 PRIVATELY MAINTAINED.
  
 -SEWER MAINS IN ALLEYS MAY NEED RELOCATION AS ADVISED
 BY ENGINEER OF RECORD AND/OR CITY OF WEST PALM BEACH.
  
 -SEWER MAIN IS SHOWN ON UTILITY PLANS ON WEST SIDE OF
 BROADWAY IN PROPOSED SIDEWALK. LOCATION WOULD MAKE
 EXCAVATION AND MAINTENANCE DIFFICULT. SOME PROPOSED
 TREE PLANTER LOCATIONS ON TOP OF SEWER MAIN ALSO
 CONFLICT WITH MAINTENANCE AS WELL AS SOME CURBING AT A
 MANHOLE.
  
 -DOMESTIC WATER SERVICES TYPICALLY ARE NOT 3 INCH. 3
 INCH METERS HAVE 4 INCH DIP SERVICE PIPE SHOWN ON
 STANDARD DETAILS.
  
 -ADD ELEVATION INFO TO SEWER MANHOLE LABELS.
  
 COMMENTS FROM MICHAEL TECHNOW, PROJECT ENGINEER, WPB
 PUBLIC UTILITIES, 561-494-1047, [email protected] :
  
 PLEASE REPLACE 24? WM ON PINEWOOD WITHIN LIMITS OF THE
 PROPOSED IMPROVEMENTS.
 - PROVIDE PROFILE FROM TAP TO POINT OF SERVICE.
 -REVISE UTILITY NOTES TO REFLECT ?CITY OF WEST PALM
 BEACH? NOT PBCWUD/COUNTY.
 - NO 3? SERVICES ALLOWED. USE EITHER 2? OR 4? WITH A
 REDUCER.
 -ADD NOTE TO CUT AND CAP ABANDONED SERVICES AT THE
 MAIN.
  
 COMMENTS FROM BURT BAIRD, CITY OF WPB UTILITIES O&M
 SUPERINTENDENT, 561-822-2056, [email protected] :
 ? PLEASE ENSURE ADDED FLOW CAN BE HANDLED AT LS# 23
 ? KIMBERLY HORN MENTIONED AN ADDITIONAL FLOW OF 54000
 GALLONS ? SEE EMAILED DOCUMENT
 ? THE COLLECTION SYSTEM AT THIS STATION EXPERIENCES
 HIGH AMOUNTS OF I&I. ANY PLANS ON THIS BEING ADDRESSED?
 ? I&I PUTS THE PUMPS AT THIS STATION ON LONG RUN TIMES
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 04-07-2022 Cont ID  
Sent By pleduc Date 04-07-2022 Time   Rev Time 0.00
Received By pleduc Date 04-07-2022 Time 13:27 Sent To  
Notes
2022-04-07 13:28:19FIRE HAS NO OBJECTIONS TO THE PROPOSED AND APPROVES.
  
 FIRE'S APPROVAL OF THIS SUBMITTED PROJECT MAY NOT
 CONSTITUTE IT'S FINAL REVIEW OR APPROVAL.
  
 FIRE SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT THE
 APPROPRIATE TIME AND IN ACCORDANCE WITH THE
 REQUIREMENTS OF ALL APPLICABLE FIRE CODES AND
 STANDARDS.
  
  
 THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE
 PROPOSED PROJECT; HOWEVER, THE FOLLOWING COMMENTS ARE
 PROVIDED AND MAY NEED FURTHER CLARIFICATIONS WHERE
 APPLICABLE.
  
 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY
 WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE
 PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A
 PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED
 TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN
 STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY
 MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER
 PROTECTION.
  
 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY
 IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING
 ALL CONSTRUCTION ACTIVITIES.
  
 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM
 ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION.
 ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND
 AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT
 WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS.
  
 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE
 REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE
 ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS.
  
 5. THE CONSTRUCTION OF EACH BUILDING SHALL COMPLY WITH
 THE 7TH EDITION OF THE FLORIDA FIRE PREVENTION CODE,
 INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES.
  
 6. ALL PARKING STRUCTURES SHALL COMPLY WITH NFPA 88A,
 PARKING STRUCTURES AND NFPA 101, THE LIFE SAFETY CODE,
 INCLUDING MORE SPECIFICALLY, CHAPTER 42 STORAGE
 OCCUPANCIES (PARKING STRUCTURES)
  
 7. A NFPA 13 COMPLAINT FIRE SPRINKLER SYSTEM AND NFPA
 14 COMPLIANT WET STANDPIPE SYSTEM ARE REQUIRED FOR THIS
 STRUCTURE. TEMPORARY STANDPIPES ARE REQUIRED WHEN THE
 BUILDING REACHES THREE LEVELS OR THIRTY FEET WHILE
 BEING CONSTRUCTED. SEPARATE SHOP DRAWINGS, ARE REQUIRED
 TO BE SUBMITTED, REVIEWED AND APPROVED BY THE FIRE
 PREVENTION BUREAU PRIOR TO ANY INSTALLATION.
  
 IT IS RECOMMENDED FOR HIGH RISES HAVE TWO SEPARATE FDC
 LOCATIONS REMOTELY LOCATED.
  
 7A. PER NFPA 14
  
 6.4.5.4* FIRE DEPARTMENT CONNECTIONS SHALL BE LOCATED
 NOT MORE THAN 100 FT (30.5 M) FROM THE NEAREST FIRE
 HYDRANT CONNECTED TO AN APPROVED WATER SUPPLY.
  
 7B. PER NFPA 1
  
 18.3 WATER SUPPLIES.
 18.3.1* AN APPROVED WATER SUPPLY CAPABLE OF SUPPLYING
 THE REQUIRED FIRE FLOW FOR FIRE PROTECTION SHALL BE
 PROVIDED TO ALL PREMISES UPON WHICH FACILITIES,
 BUILDINGS, OR PORTIONS OF BUILDINGS ARE HEREAFTER
 CONSTRUCTED OR MOVED INTO THE JURISDICTION. THE
 APPROVED WATER SUPPLY SHALL BE IN ACCORDANCE WITH
 SECTION 18.4.
  
 PER FLORIDA ADMINISTRATIVE CODE SECTION 61G15-32.004,
 FIRE PROTECTION ENGINEERING DOCUMENTS SHALL INCLUDE THE
 POINT OF SERVICE FOR THE WATER SUPPLY, A LIST OF
 APPLICABLE NFPA STANDARDS APPLICABLE TO THE PROJECT,
 CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR
 AREA, SUPPRESSION SYSTEM TYPE, DESIGN DENSITIES, WATER
 SUPPLY DATA (FIRE PUMP DATA, HYDRANT FLOW TEST DATA)
 AND ANY PERFORMANCE BASED INFORMATION SUCH AS
 PRE-ENGINEERED SYSTEMS.
  
 FOR ANY PROPOSED FIRE PUMP(S) , WHAT IS(ARE) THE
 PRIMARY AND SECONDARY POWER SOURCES?
  
 7C. THE LOCATION OF THE DDCV FIRE LINE LOCATION SHALL
 MEET THE REQUIREMENTS OF NFPA 24 AND SHALL BE
 COORDINATED WITH THE OFFICE OF FIRE MARSHAL, THE CITY'S
 ENGINEERS OFFICE, THE LANDSCAPE PLANNER, AND THE CITY'S
 PLANNING AND ZONING OFFICE.
  
 8. A CLASS ?A? NFPA 72 COMPLIANT MONITORED FIRE ALARM
 SYSTEM IS REQUIRED FOR THIS STRUCTURE. SEPARATE SHOP
 DRAWINGS, ARE REQUIRED TO BE SUBMITTED, REVIEWED AND
 APPROVED BY THE FIRE PREVENTION BUREAU PRIOR TO ANY
 INSTALLATION.
  
 9. ALL ELEVATORS OVER 6 FLOORS SHALL BE EQUIPPED WITH A
 REGION 7 KEYWAY SYSTEM.
  
 ALL NEW ELEVATORS SHALL CONFORM TO THE FIRE FIGHTER?S
 EMERGENCY OPERATIONS REQUIREMENTS OF ASME A17.1/CSA
 B44, SAFETY CODE FOR ELEVATORS.
  
 ANY BUILDING THAT IS MORE THAN THREE STORIES HIGH OR IN
 WHICH THE VERTICAL DISTANCE BETWEEN THE BOTTOM TERMINAL
 LANDING AND THE TOP TERMINAL LANDING EXCEEDS 25 FEET
 MUST BE CONSTRUCTED TO CONTAIN AT LEAST ONE PASSENGER
 ELEVATOR THAT IS OPERATIONAL AND WILL ACCOMMODATE AN
 AMBULANCE STRETCHER 76 INCHES LONG AND 24 INCHES WIDE
 IN THE HORIZONTAL POSITION.
  
 10. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL
 BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL
 DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS,
 EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A
 PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE
 SAFETY FEATURES AND EQUIPMENT.
  
 11. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS
 DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED
 ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF
 FIRE PREVENTION.
  
 ALL NEW FIRE HYDRANTS AND FDC?S PLANNED FOR THIS
 DEVELOPMENT SHALL BE CLOSELY COORDINATED WITH THE
 BUREAU OF FIRE PREVENTION. PROPOSED FIRE HYDRANTS AND
 FDC?S SHOULD BE LOCATED ON THE SAME SIDE OF THE STREET
 OR ACCESS ROADWAY TO ALLOW FREE ACCESS FOR OTHER
 ARRIVING EMERGENCY VEHICLES.
  
  
 12. HIGH RISE EMERGENCY COMMAND ROOM
  
 THE FIRE COMMAND CENTER SHALL COMPLY WITH NFPA 1,
 CHAPTER 11, BUILDING SERVICES; 11.9 AND SHALL CONTAIN
 THE FOLLOWING FEATURES:
  
 11.9.1 THE LOCATION, DESIGN, CONTENT, AND FIRE
 DEPARTMENT ACCESS OF THE EMERGENCY COMMAND CENTER SHALL
 BE APPROVED BY THE FIRE DEPARTMENT.
  
 11.9.2 THE EMERGENCY COMMAND CENTER SHALL BE SEPARATED
 FROM THE REMAINDER OF THE BUILDING BY A FIRE BARRIER
 HAVING A FIRE RESISTANCE RATING OF NOT LESS THAN 1
 HOUR.
  
 11.9.3 THE EMERGENCY COMMAND CENTER ROOM SHALL BE A
 MINIMUM OF 200 FT2 (19 M2) WITH A MINIMUM DIMENSION OF
 10 FT (3050 MM).
  
 11.9.4 THE FOLLOWING SHALL BE PROVIDED IN THE EMERGENCY
 COMMAND CENTER.
 (1) THE FIRE DEPARTMENT COMMUNICATIONS SYSTEM.
 (2) A TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED
 ACCESS TO THE PUBLIC TELEPHONE SYSTEM
 (3) SCHEMATIC BUILDING PLANS INDICATING THE TYPICAL
 FLOOR PLAN AND DETAILING THE BUILDING CORE, MEANS OF
 EGRESS, FIRE PROTECTION SYSTEMS, FIRE-FIGHTING
 EQUIPMENT AND FIRE DEPARTMENT ACCESS
 (4) WORK TABLE.
 (5) IF APPLICABLE, A HAZARDOUS MATERIAL MANAGEMENT PLAN
 FOR THE BUILDING.
 11.9.5 WHERE OTHERWISE REQUIRED, THE FOLLOWING DEVICES
 OR FUNCTIONS SHALL BE PROVIDED WITHIN THE EMERGENCY
 COMMAND CENTER.
 (1) THE EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM
 CONTROL UNIT.
 (2) FIRE DETECTION AND ALARM SYSTEM ANNUNCIATOR UNIT.
 (3) ANNUNCIATOR UNIT VISUALLY INDICATING THE LOCATION
 OF THE ELEVATORS AND WHETHER THEY ARE OPERATIONAL
 (4) STATUS INDICATORS AND CONTROLS FOR AIR-HANDLING
 SYSTEMS.
 (5) CONTROLS FOR UNLOCKING STAIRWAY DOORS
 SIMULTANEOUSLY
 (6) SPRINKLER VALVE AND WATER FLOW DETECTOR DISPLAY
 PANELS
 (7) EMERGENCY AND STANDBY POWER STATUS INDICATORS
 (8) FIRE PUMP STATUS INDICATORS
 (9) GENERATOR SUPERVISION DEVICES AND MANUAL START AND
 TRANSFER FEATURES.
 (10) PUBLIC ADDRESS SYSTEM, WHERE SPECIFICALLY REQUIRED
 BY OTHER SECTIONS OF THIS CODE
 (11) CONTROLS REQUIRED FOR SMOKE CONTROL
  
 NFPA 101
  
 11.8.6* EMERGENCY COMMAND CENTER.
 11.8.6.1 AN EMERGENCY COMMAND CENTER SHALL BE PROVIDED
 IN A
 LOCATION APPROVED BY THE FIRE DEPARTMENT.
 11.8.6.2 THE EMERGENCY COMMAND CENTER SHALL CONTAIN THE
 FOLLOWING:
 (1) VOICE FIRE ALARM SYSTEM PANELS AND CONTROLS
 (2) FIRE DEPARTMENT TWO-WAY TELEPHONE COMMUNICATION
 SERVICE
 PANELS AND CONTROLS WHERE REQUIRED BY ANOTHER SECTION
 OF THIS
 CODE
 (3) FIRE DETECTION AND FIRE ALARM SYSTEM ANNUNCIATION
 PANELS
 (4) ELEVATOR FLOOR LOCATION AND OPERATION ANNUNCIATORS
 (5) ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME
 A17.1/CSA B44, SAFETY CODE FOR ELEVATORS AND ESCALATORS
 (6) ELEVATOR EMERGENCY POWER SELECTOR SWITCH(ES) WHERE
 PROVIDED
 IN ACCORDANCE WITH ASME A17.1/CSA B44
 (7) SPRINKLER VALVE AND WATERFLOW ANNUNCIATORS
 (8) EMERGENCY GENERATOR STATUS INDICATORS
 (9) CONTROLS FOR ANY AUTOMATIC STAIRWAY DOOR UNLOCKING
 SYSTEM
 (10) FIRE PUMP STATUS INDICATORS
 (11) TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED
 ACCESS TO THE
 PUBLIC TELEPHONE SYSTEM
 (12) STAIRWAY VIDEO MONITORING EQUIPMENT AS REQUIRED BY
 11.8.8
  
  
 13. EMERGENCY RADIO COMMUNICATIONS
  
 NFPA 1, CHAPTER 11, BUILDING SERVICES; 11.10 TWO-WAY
 RADIO ENHANCEMENT SERVICES.
  
 11.10.1 IN ALL NEW AND EXISTING BUILDINGS, MINIMUM
 RADIO SIGNAL STRENGTH FOR FIRE DEPARTMENT
 COMMUNICATIONS SHALL BE MAINTAINED AT A LEVEL
 DETERMINED BY THE AHJ.
 NFPA 72, 24.9 TWO-WAY RADIO COMMUNICATIONS ENHANCEMENT
 SYSTEMS.
 24.9.1 GENERAL.
 24.9.1.1 NON-INTERFERENCE. NO AMPLIFICATION SYSTEM
 CAPABLE
 OF OPERATING ON FREQUENCIES OR CAUSING INTERFERENCE ON
 FREQUENCIES
 ASSIGNED TO THE JURISDICTION BY THE FCC SHALL BE
 INSTALLED
 WITHOUT PRIOR COORDINATION AND APPROVAL OF THE
 AUTHORITY
 HAVING JURISDICTION. THE BUILDING MANAGER/OWNER SHALL
 SUSPEND AND CORRECT OTHER EQUIPMENT INSTALLATIONS THAT
 DEGRADE
 THE PERFORMANCE OF THE PUBLIC SAFETY RADIO SYSTEM OR
 PUBLIC SAFETY RADIO ENHANCEMENT SYSTEM.
 24.9.1.2 APPROVAL AND PERMIT. PLANS SHALL BE SUBMITTED
 FOR
 APPROVAL PRIOR TO INSTALLATION. AT THE CONCLUSION OF
 SUCCESSFUL
 ACCEPTANCE TESTING, A RENEWABLE PERMIT SHALL BE ISSUED
 FOR THE
 PUBLIC SAFETY RADIO ENHANCEMENT SYSTEM WHERE REQUIRED
 BY
 THE AUTHORITY HAVING JURISDICTION.
  
 THE SYSTEM SHALL MAINTAIN A MINIMUM RADIO SIGNAL
 STRENGTH OF -95 DBM FOR THE RADIO SYSTEM USED BY WEST
 PALM BEACH FIRE DEPARTMENT. TESTING SHALL BE BY AN
 ACCEPTABLE NATIONAL STANDARD DOCUMENTING PERCENTAGES
 NOTED ABOVE AND BY ACTUAL RADIO TESTING BY FIRE
 PERSONNEL. IF THE MINIMUM CANNOT BE MAINTAINED, A
 BI-DIRECTIONAL AMPLIFIED SYSTEM SHALL BE INSTALLED WITH
 A MINIMUM 2-HOUR RUN TIME BATTERY BACK-UP.
 PLEASE CONTACT MARK FILLA, PALM BEACH COUNTY PUBLIC
 SAFETY RADIO SYSTEMS MANAGER, [email protected],
 561-233-0837; AS OUR RADIOS OPERATE ON THEIR SYSTEM FOR
 DETAILED RADIO FREQUENCY AND INSTALLATION INSTRUCTIONS.
  
  
 14. KNOX-BOX KEY SYSTEM SHALL BE REQUIRED FOR THIS
 BUILDING.
  
 ANY GATES SHALL BE PROVIDED WITH KNOX KEY ACCESS LOCKS,
 PADLOCKS AND/OR SWITCHES FOR 24 HOUR EMERGENCY ACCESS.
  
 15.HIGH RISE SMOKE CONTROL SYSTEM SHALL COMPLY WITH
 NFPA 101, CHAPTER 9, BUILDING SERVICE AND FIRE
 PROTECTION EQUIPMENT, INCLUDING:
  
 THE SMOKE CONTROL SYSTEMS SHALL BE INSTALLED,
 INSPECTED, TESTED, AND MAINTAINED IN ACCORDANCE WITH
 NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS; NFPA 204,
 STANDARD FOR SMOKE AND HEAT VENTING; OR NATIONALLY
 RECOGNIZED STANDARDS, ENGINEERING GUIDES, OR
 RECOMMENDED PRACTICES, AS APPROVED BY THE AUTHORITY
 HAVING JURISDICTION.
  
 THE ENGINEER OF RECORD SHALL CLEARLY IDENTIFY THE
 INTENT OF THE SYSTEM, THE DESIGN METHOD USED, THE
 APPROPRIATENESS OF THE METHOD USED, AND THE REQUIRED
 MEANS OF INSPECTING, TESTING, AND MAINTAINING THE
 SYSTEM.
  
 ACCEPTANCE TESTING SHALL BE PERFORMED BY A SPECIAL
 INSPECTOR IN ACCORDANCE WITH SECTION 9.9.
  
 16. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT
 DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL.
  
 17. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING
 PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH
 THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 11-10-2021 Cont ID  
Sent By pleduc Date 11-10-2021 Time   Rev Time 0.00
Received By pleduc Date 11-10-2021 Time 15:45 Sent To  
Notes
2021-11-10 15:46:26FIRE HAS NO OBJECTIONS TO THE PROPOSED AND APPROVES.
  
 FIRE'S APPROVAL OF THIS SUBMITTED PROJECT MAY NOT
 CONSTITUTE IT'S FINAL REVIEW OR APPROVAL.
  
 FIRE SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT THE
 APPROPRIATE TIME AND IN ACCORDANCE WITH THE
 REQUIREMENTS OF ALL APPLICABLE FIRE CODES AND
 STANDARDS.
  
  
 THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE
 PROPOSED PROJECT; HOWEVER, THE FOLLOWING COMMENTS ARE
 PROVIDED AND MAY NEED FURTHER CLARIFICATIONS WHERE
 APPLICABLE.
  
 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY
 WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE
 PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A
 PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED
 TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN
 STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY
 MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER
 PROTECTION.
  
 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY
 IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING
 ALL CONSTRUCTION ACTIVITIES.
  
 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM
 ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION.
 ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND
 AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT
 WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS.
  
 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE
 REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE
 ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS.
  
 5. THE CONSTRUCTION OF EACH BUILDING SHALL COMPLY WITH
 THE 7TH EDITION OF THE FLORIDA FIRE PREVENTION CODE,
 INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES.
  
 6. ALL PARKING STRUCTURES SHALL COMPLY WITH NFPA 88A,
 PARKING STRUCTURES AND NFPA 101, THE LIFE SAFETY CODE,
 INCLUDING MORE SPECIFICALLY, CHAPTER 42 STORAGE
 OCCUPANCIES (PARKING STRUCTURES)
  
 7. A NFPA 13 COMPLAINT FIRE SPRINKLER SYSTEM AND NFPA
 14 COMPLIANT WET STANDPIPE SYSTEM ARE REQUIRED FOR THIS
 STRUCTURE. TEMPORARY STANDPIPES ARE REQUIRED WHEN THE
 BUILDING REACHES THREE LEVELS OR THIRTY FEET WHILE
 BEING CONSTRUCTED. SEPARATE SHOP DRAWINGS, ARE REQUIRED
 TO BE SUBMITTED, REVIEWED AND APPROVED BY THE FIRE
 PREVENTION BUREAU PRIOR TO ANY INSTALLATION.
  
 IT IS RECOMMENDED FOR HIGH RISES HAVE TWO SEPARATE FDC
 LOCATIONS REMOTELY LOCATED.
  
 7A. PER NFPA 14
  
 6.4.5.4* FIRE DEPARTMENT CONNECTIONS SHALL BE LOCATED
 NOT MORE THAN 100 FT (30.5 M) FROM THE NEAREST FIRE
 HYDRANT CONNECTED TO AN APPROVED WATER SUPPLY.
  
 7B. PER NFPA 1
  
 18.3 WATER SUPPLIES.
 18.3.1* AN APPROVED WATER SUPPLY CAPABLE OF SUPPLYING
 THE REQUIRED FIRE FLOW FOR FIRE PROTECTION SHALL BE
 PROVIDED TO ALL PREMISES UPON WHICH FACILITIES,
 BUILDINGS, OR PORTIONS OF BUILDINGS ARE HEREAFTER
 CONSTRUCTED OR MOVED INTO THE JURISDICTION. THE
 APPROVED WATER SUPPLY SHALL BE IN ACCORDANCE WITH
 SECTION 18.4.
  
 PER FLORIDA ADMINISTRATIVE CODE SECTION 61G15-32.004,
 FIRE PROTECTION ENGINEERING DOCUMENTS SHALL INCLUDE THE
 POINT OF SERVICE FOR THE WATER SUPPLY, A LIST OF
 APPLICABLE NFPA STANDARDS APPLICABLE TO THE PROJECT,
 CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR
 AREA, SUPPRESSION SYSTEM TYPE, DESIGN DENSITIES, WATER
 SUPPLY DATA (FIRE PUMP DATA, HYDRANT FLOW TEST DATA)
 AND ANY PERFORMANCE BASED INFORMATION SUCH AS
 PRE-ENGINEERED SYSTEMS.
  
 FOR ANY PROPOSED FIRE PUMP(S) , WHAT IS(ARE) THE
 PRIMARY AND SECONDARY POWER SOURCES?
  
 7C. THE LOCATION OF THE DDCV FIRE LINE LOCATION SHALL
 MEET THE REQUIREMENTS OF NFPA 24 AND SHALL BE
 COORDINATED WITH THE OFFICE OF FIRE MARSHAL, THE CITY'S
 ENGINEERS OFFICE, THE LANDSCAPE PLANNER, AND THE CITY'S
 PLANNING AND ZONING OFFICE.
  
 8. A CLASS ?A? NFPA 72 COMPLIANT MONITORED FIRE ALARM
 SYSTEM IS REQUIRED FOR THIS STRUCTURE. SEPARATE SHOP
 DRAWINGS, ARE REQUIRED TO BE SUBMITTED, REVIEWED AND
 APPROVED BY THE FIRE PREVENTION BUREAU PRIOR TO ANY
 INSTALLATION.
  
 9. ALL ELEVATORS OVER 6 FLOORS SHALL BE EQUIPPED WITH A
 REGION 7 KEYWAY SYSTEM.
  
 ALL NEW ELEVATORS SHALL CONFORM TO THE FIRE FIGHTER?S
 EMERGENCY OPERATIONS REQUIREMENTS OF ASME A17.1/CSA
 B44, SAFETY CODE FOR ELEVATORS.
  
 ANY BUILDING THAT IS MORE THAN THREE STORIES HIGH OR IN
 WHICH THE VERTICAL DISTANCE BETWEEN THE BOTTOM TERMINAL
 LANDING AND THE TOP TERMINAL LANDING EXCEEDS 25 FEET
 MUST BE CONSTRUCTED TO CONTAIN AT LEAST ONE PASSENGER
 ELEVATOR THAT IS OPERATIONAL AND WILL ACCOMMODATE AN
 AMBULANCE STRETCHER 76 INCHES LONG AND 24 INCHES WIDE
 IN THE HORIZONTAL POSITION.
  
 10. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL
 BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL
 DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS,
 EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A
 PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE
 SAFETY FEATURES AND EQUIPMENT.
  
 11. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS
 DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED
 ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF
 FIRE PREVENTION.
  
 ALL NEW FIRE HYDRANTS AND FDC?S PLANNED FOR THIS
 DEVELOPMENT SHALL BE CLOSELY COORDINATED WITH THE
 BUREAU OF FIRE PREVENTION. PROPOSED FIRE HYDRANTS AND
 FDC?S SHOULD BE LOCATED ON THE SAME SIDE OF THE STREET
 OR ACCESS ROADWAY TO ALLOW FREE ACCESS FOR OTHER
 ARRIVING EMERGENCY VEHICLES.
  
  
 12. HIGH RISE EMERGENCY COMMAND ROOM
  
 THE FIRE COMMAND CENTER SHALL COMPLY WITH NFPA 1,
 CHAPTER 11, BUILDING SERVICES; 11.9 AND SHALL CONTAIN
 THE FOLLOWING FEATURES:
  
 11.9.1 THE LOCATION, DESIGN, CONTENT, AND FIRE
 DEPARTMENT ACCESS OF THE EMERGENCY COMMAND CENTER SHALL
 BE APPROVED BY THE FIRE DEPARTMENT.
  
 11.9.2 THE EMERGENCY COMMAND CENTER SHALL BE SEPARATED
 FROM THE REMAINDER OF THE BUILDING BY A FIRE BARRIER
 HAVING A FIRE RESISTANCE RATING OF NOT LESS THAN 1
 HOUR.
  
 11.9.3 THE EMERGENCY COMMAND CENTER ROOM SHALL BE A
 MINIMUM OF 200 FT2 (19 M2) WITH A MINIMUM DIMENSION OF
 10 FT (3050 MM).
  
 11.9.4 THE FOLLOWING SHALL BE PROVIDED IN THE EMERGENCY
 COMMAND CENTER.
 (1) THE FIRE DEPARTMENT COMMUNICATIONS SYSTEM.
 (2) A TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED
 ACCESS TO THE PUBLIC TELEPHONE SYSTEM
 (3) SCHEMATIC BUILDING PLANS INDICATING THE TYPICAL
 FLOOR PLAN AND DETAILING THE BUILDING CORE, MEANS OF
 EGRESS, FIRE PROTECTION SYSTEMS, FIRE-FIGHTING
 EQUIPMENT AND FIRE DEPARTMENT ACCESS
 (4) WORK TABLE.
 (5) IF APPLICABLE, A HAZARDOUS MATERIAL MANAGEMENT PLAN
 FOR THE BUILDING.
 11.9.5 WHERE OTHERWISE REQUIRED, THE FOLLOWING DEVICES
 OR FUNCTIONS SHALL BE PROVIDED WITHIN THE EMERGENCY
 COMMAND CENTER.
 (1) THE EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM
 CONTROL UNIT.
 (2) FIRE DETECTION AND ALARM SYSTEM ANNUNCIATOR UNIT.
 (3) ANNUNCIATOR UNIT VISUALLY INDICATING THE LOCATION
 OF THE ELEVATORS AND WHETHER THEY ARE OPERATIONAL
 (4) STATUS INDICATORS AND CONTROLS FOR AIR-HANDLING
 SYSTEMS.
 (5) CONTROLS FOR UNLOCKING STAIRWAY DOORS
 SIMULTANEOUSLY
 (6) SPRINKLER VALVE AND WATER FLOW DETECTOR DISPLAY
 PANELS
 (7) EMERGENCY AND STANDBY POWER STATUS INDICATORS
 (8) FIRE PUMP STATUS INDICATORS
 (9) GENERATOR SUPERVISION DEVICES AND MANUAL START AND
 TRANSFER FEATURES.
 (10) PUBLIC ADDRESS SYSTEM, WHERE SPECIFICALLY REQUIRED
 BY OTHER SECTIONS OF THIS CODE
 (11) CONTROLS REQUIRED FOR SMOKE CONTROL
  
 NFPA 101
  
 11.8.6* EMERGENCY COMMAND CENTER.
 11.8.6.1 AN EMERGENCY COMMAND CENTER SHALL BE PROVIDED
 IN A
 LOCATION APPROVED BY THE FIRE DEPARTMENT.
 11.8.6.2 THE EMERGENCY COMMAND CENTER SHALL CONTAIN THE
 FOLLOWING:
 (1) VOICE FIRE ALARM SYSTEM PANELS AND CONTROLS
 (2) FIRE DEPARTMENT TWO-WAY TELEPHONE COMMUNICATION
 SERVICE
 PANELS AND CONTROLS WHERE REQUIRED BY ANOTHER SECTION
 OF THIS
 CODE
 (3) FIRE DETECTION AND FIRE ALARM SYSTEM ANNUNCIATION
 PANELS
 (4) ELEVATOR FLOOR LOCATION AND OPERATION ANNUNCIATORS
 (5) ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME
 A17.1/CSA B44, SAFETY CODE FOR ELEVATORS AND ESCALATORS
 (6) ELEVATOR EMERGENCY POWER SELECTOR SWITCH(ES) WHERE
 PROVIDED
 IN ACCORDANCE WITH ASME A17.1/CSA B44
 (7) SPRINKLER VALVE AND WATERFLOW ANNUNCIATORS
 (8) EMERGENCY GENERATOR STATUS INDICATORS
 (9) CONTROLS FOR ANY AUTOMATIC STAIRWAY DOOR UNLOCKING
 SYSTEM
 (10) FIRE PUMP STATUS INDICATORS
 (11) TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED
 ACCESS TO THE
 PUBLIC TELEPHONE SYSTEM
 (12) STAIRWAY VIDEO MONITORING EQUIPMENT AS REQUIRED BY
 11.8.8
  
  
 13. EMERGENCY RADIO COMMUNICATIONS
  
 NFPA 1, CHAPTER 11, BUILDING SERVICES; 11.10 TWO-WAY
 RADIO ENHANCEMENT SERVICES.
  
 11.10.1 IN ALL NEW AND EXISTING BUILDINGS, MINIMUM
 RADIO SIGNAL STRENGTH FOR FIRE DEPARTMENT
 COMMUNICATIONS SHALL BE MAINTAINED AT A LEVEL
 DETERMINED BY THE AHJ.
 NFPA 72, 24.9 TWO-WAY RADIO COMMUNICATIONS ENHANCEMENT
 SYSTEMS.
 24.9.1 GENERAL.
 24.9.1.1 NON-INTERFERENCE. NO AMPLIFICATION SYSTEM
 CAPABLE
 OF OPERATING ON FREQUENCIES OR CAUSING INTERFERENCE ON
 FREQUENCIES
 ASSIGNED TO THE JURISDICTION BY THE FCC SHALL BE
 INSTALLED
 WITHOUT PRIOR COORDINATION AND APPROVAL OF THE
 AUTHORITY
 HAVING JURISDICTION. THE BUILDING MANAGER/OWNER SHALL
 SUSPEND AND CORRECT OTHER EQUIPMENT INSTALLATIONS THAT
 DEGRADE
 THE PERFORMANCE OF THE PUBLIC SAFETY RADIO SYSTEM OR
 PUBLIC SAFETY RADIO ENHANCEMENT SYSTEM.
 24.9.1.2 APPROVAL AND PERMIT. PLANS SHALL BE SUBMITTED
 FOR
 APPROVAL PRIOR TO INSTALLATION. AT THE CONCLUSION OF
 SUCCESSFUL
 ACCEPTANCE TESTING, A RENEWABLE PERMIT SHALL BE ISSUED
 FOR THE
 PUBLIC SAFETY RADIO ENHANCEMENT SYSTEM WHERE REQUIRED
 BY
 THE AUTHORITY HAVING JURISDICTION.
  
 THE SYSTEM SHALL MAINTAIN A MINIMUM RADIO SIGNAL
 STRENGTH OF -95 DBM FOR THE RADIO SYSTEM USED BY WEST
 PALM BEACH FIRE DEPARTMENT. TESTING SHALL BE BY AN
 ACCEPTABLE NATIONAL STANDARD DOCUMENTING PERCENTAGES
 NOTED ABOVE AND BY ACTUAL RADIO TESTING BY FIRE
 PERSONNEL. IF THE MINIMUM CANNOT BE MAINTAINED, A
 BI-DIRECTIONAL AMPLIFIED SYSTEM SHALL BE INSTALLED WITH
 A MINIMUM 2-HOUR RUN TIME BATTERY BACK-UP.
 PLEASE CONTACT MARK FILLA, PALM BEACH COUNTY PUBLIC
 SAFETY RADIO SYSTEMS MANAGER, [email protected],
 561-233-0837; AS OUR RADIOS OPERATE ON THEIR SYSTEM FOR
 DETAILED RADIO FREQUENCY AND INSTALLATION INSTRUCTIONS.
  
  
 14. KNOX-BOX KEY SYSTEM SHALL BE REQUIRED FOR THIS
 BUILDING.
  
 ANY GATES SHALL BE PROVIDED WITH KNOX KEY ACCESS LOCKS,
 PADLOCKS AND/OR SWITCHES FOR 24 HOUR EMERGENCY ACCESS.
  
 15.HIGH RISE SMOKE CONTROL SYSTEM SHALL COMPLY WITH
 NFPA 101, CHAPTER 9, BUILDING SERVICE AND FIRE
 PROTECTION EQUIPMENT, INCLUDING:
  
 THE SMOKE CONTROL SYSTEMS SHALL BE INSTALLED,
 INSPECTED, TESTED, AND MAINTAINED IN ACCORDANCE WITH
 NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS; NFPA 204,
 STANDARD FOR SMOKE AND HEAT VENTING; OR NATIONALLY
 RECOGNIZED STANDARDS, ENGINEERING GUIDES, OR
 RECOMMENDED PRACTICES, AS APPROVED BY THE AUTHORITY
 HAVING JURISDICTION.
  
 THE ENGINEER OF RECORD SHALL CLEARLY IDENTIFY THE
 INTENT OF THE SYSTEM, THE DESIGN METHOD USED, THE
 APPROPRIATENESS OF THE METHOD USED, AND THE REQUIRED
 MEANS OF INSPECTING, TESTING, AND MAINTAINING THE
 SYSTEM.
  
 ACCEPTANCE TESTING SHALL BE PERFORMED BY A SPECIAL
 INSPECTOR IN ACCORDANCE WITH SECTION 9.9.
  
 16. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT
 DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL.
  
 17. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING
 PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH
 THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  

Review Stop HIST HISTORICAL
Rev No 3 Status P Date 09-27-2022 Cont ID  
Sent By fmittner Date 09-27-2022 Time 16:08 Rev Time 0.00
Received By fmittner Date 09-27-2022 Time 16:07 Sent To  
Notes
***NONE***

Review Stop HIST HISTORICAL
Rev No 2 Status F Date 08-15-2022 Cont ID  
Sent By fmittner Date 08-15-2022 Time 14:21 Rev Time 0.00
Received By fmittner Date 08-15-2022 Time 14:21 Sent To  
Notes
2022-08-15 14:24:53ITEM APPROVED BY HPB, MODIFICATIONS IN LINE WITH
 COMMENTS. HOWEVER, SHIFTING OF STRUCTURE ON NORTHWOOD
 ROAD AND DEMOLITION OF LOT 23 RESULTING IN VACANT
 LAND/THROUGH STREET REQUIRES UPDATED HPB APPROVAL.

Review Stop HIST HISTORICAL
Rev No 1 Status F Date 11-18-2021 Cont ID  
Sent By fmittner Date 11-18-2021 Time 09:50 Rev Time 0.00
Received By fmittner Date 11-18-2021 Time 09:49 Sent To  
Notes
2021-11-18 09:56:06TWO BUILDINGS OF OVERALL PROJECT EXTEND INTO NORTHWOOD
 ROAD HISTORIC DISTRICT. DOES NOT MEET DESIGN GUIDLEINES
 OR COMPATIBILITY STANDARDS IN MASSING, SIZE, SCALE OR
 ARCHITECTURAL FEATURES. HAVE DISCUSSED WITH ARCHITECT
 AND TEAM AND THEY WILL REVISE ACCORDINGINGLY FOR A
 SMOOTHER TRANSITION AND FACADE TRAETMENT OF URBAN
 RETAIL SPACE AT GROUND FLOOR AND OVERALL. NEW
 CONSTRUCTION WILL NEED TO BE HARD AND APPROVED BY HPB,
 CURRENTLY SCHEDULED FOR 12/15/21.
  
 QUESTIONS, CONTACT:
 FRIEDERIKE MITTNER, CITY HISTORIC PRESERVATION PLANNER
 (561) 822-1457 OR [email protected]

Review Stop L LANDSCAPING
Rev No 6 Status F Date 01-05-2023 Cont ID  
Sent By rcaranci Date 01-05-2023 Time 16:22 Rev Time 0.00
Received By rcaranci Date 01-05-2023 Time 16:22 Sent To  
Notes
2023-01-05 16:23:00FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: NORTHWOOD ANCHOR SITE Z21080015
 JANUARY 5, 2023
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 1. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE
 TREES AND PALMS IN GOOD CONDITION TO BE PRESERVED ON
 SITE OR RELOCATED. ANSI A 300 (PART 5) STANDARDS
 SPECIFY EXAMPLES OF SUITABILITY RATINGS OF GOOD,
 MODERATE, OR POOR FOR RELOCATION. PROVIDE AN ARBORISTS
 REPORT RATING THE CONDITION AND RELOCATION POTENTIAL
 FOR THE NATIVE TREES AND PALMS. THERE ARE LIVE OAKS,
 SABAL PALMS, AND ROYAL PALMS THAT ARE INDICATED TO BE
 REMOVED. NON NATIVE TREES AND PALMS ARE NOT REQUIRED TO
 BE RELOCATED.
 2. MAKE THE FOLLOWING CORRECTIONS TO THE TREE
 DISPOSITION LIST:
 ??? SATISFIED. THERE ARE MULTIPLE TREES AND PALMS THAT
 ARE MISIDENTIFIED ON THE TREE DISPOSITION LIST.
 ??? SATISFIED. ONLY TREES PROPOSED TO BE REMOVED WITH A
 CANOPY DIAMETER OF 20 FEET OR MORE SHOULD HAVE THE
 MITIGATION SQUARE FOOTAGE CALCULATED BASED ON THE
 ACTUAL DIAMETER. TREES LESS THAN 20 FEET CANOPY
 DIAMETER AND PALMS SHOULD SHOW THE CATEGORY MITIGATION
 DUE.
 SHOW THE MITIGATION SQUARE FOOTAGE DUE FOR PALMS BY
 CATEGORY (CATEGORY 3 IS 100 SQ FT, CATEGORY 4 IS 50 SQ
 FT.)
 ??? SATISFIED. MULTIPLE PALMS PLANTED TOGETHER MUST
 HAVE EACH SINGLE TRUNK COUNTED TOWARD MITIGATION.
 EXAMPLE: TRIPLE ADONIDIA WOULD BE 3 X 50 SQ FT.
 ??? SATISFIED. PROVIDE THE TOTAL MITIGATION SQUARE
 FOOTAGE DUE.
 PROVIDE THE TOTAL MITIGATION SQUARE FOOTAGE DUE.
 ??? SATISFIED. PROVIDE THE MITIGATION SQUARE FOOTAGE
 PROVIDED BASED ON THE PLANT LIST.
  
 3. SATISFIED. PROVIDE A DIAGRAM OF THE REQUIRED AND
 PROVIDED PUBLIC, SEMI-PUBLIC, PRIVATE OPEN AREAS AND
 URBAN GREENWAYS SYSTEM FOR EACH PARCEL IN THE NMUD
 ZONING DISTRICT. IDENTIFY THE TYPE OF OPEN SPACE. 10%
 COMMON PRIVATE OPEN SPACE IS REQUIRED.
 THE REQUIRED OPEN SPACE NEEDS TO BE QUANTIFIED,
 IDENTIFIED AS TO THE TYPE, AND ALL REQUIREMENTS NEED TO
 BE SHOWN FOR THAT OPEN SPACE TYPE.
 SURFACE PARKING AREAS CANNOT BE COUNTED TOWARD REQUIRED
 OPEN SPACE.
 4/13/22 SHEET A103.0 COULD NOT BE LOCATED IN THE
 SUBMITTAL. SHEET L102 SHOWS SURFACE PARKING AREA
 COUNTED AS LANDSCAPE OPEN SPACE.
  
 4. SATISFIED. SHOW THE ROOFTOP TERRACES AND INCLUDE HOW
 THE REQUIREMENTS OF SECTION 94-210 P. 5. ARE MET,
 INCLUDING 15% LANDSCAPE REQUIREMENT AND PROVIDE A
 LANDSCAPE PLAN FOR EACH AREA.
  
 5. SATISFIED. IDENTIFY RELOCATED TREES OR PALMS ON THE
 PLANT LIST AND COUNT THEM TOWARD THE REQUIRED TREES.
  
 6. SATISFIED. IF ANY ARTIFICIAL TURF AREAS ARE
 PROPOSED, THEY MUST MEET THE REQUIREMENTS OF SECTION
 94-451, INCLUDING ALL AREAS THAT ARE ALLOWED BY CODE
 MUST NOT BE VISIBLE FROM A ROAD OR STREET.
  
 7. SATISFIED. BUFFER TREES AND HEDGES MUST BE PROVIDED
 ALONG ALL BUFFERS. THERE IS A LARGE GAP IN THE TREES
 ADJACENT TO THE WEST OF THE SURFACE PARKING LOT. THE
 WEST PROPERTY LINE ADJACENT TO THE FEC RAILROAD RIGHT
 OF WAY REQUIRES AT LEAST A 5 FOOT BUFFER STRIP PER
 SECTION 94-209 2. F. 1. E.
  
 THE BUFFER ON THE SOUTH SIDE OF THE SURFACE PARKING LOT
 DOES NOT MEET THE REQUIRED WIDTH.
  
 8. SATISFIED. PROVIDE CALCULATIONS FOR REQUIRED STREET
 TREES AT MAXIMUM SPACING EVERY 30 FEET OR PORTION
 THEREOF AND SHOW THE NUMBER PROVIDED FOR EACH
 STREETSCAPE LENGTH. SHOW THE REQUIRED PLANTING STRIP.
  
 4/13/22 EACH BLOCK STREET SEGMENT MUST BE LISTED WITH
 THE TOTAL LENGTH OF THE ADJACENT PROPERTY LINE AND THE
 REQUIRED AND PROVIDED STREET TREES SHOWN. CANNOT
 COMBINE SEGMENTS. THE NUMBER IN SOME SEGMENTS DOES NOT
 MEET CODE. THE OVERALL INTENT IS TO PROVIDE MAXIMUM
 TREE CANOPY COVERAGE FOR ALL SEGMENTS.
  
 6/27/22 THE AREA ALONG 25TH STREET SHOWS A LONG GAP
 BETWEEN TREES WITH UTILITY VALVES AND FIRE HYDRANT.
 THIS NEEDS TO BE SPREAD OUT TO ALLOW TREES TO BE IN
 BETWEEN VALVES.
 STREET TREES ARE NOT SHOWN ON THE NORTHWOOD ROAD
 SEGMENT.
  
 9. SATISFIED. CORRECT THE CODE REQUIREMENTS CHART ON
 SHEET L1.01TO UPDATE THE SHADE AND FLOWERING TREE
 REQUIREMENTS OF SECTION 94-442 C. 2. B. TO CURRENT
 CODE.
  
  
 10. SATISFIED. REMOVED FROM PLAN. CORRECT THE CODE
 REQUIREMENTS CHART ON SHEET L1.01TO UPDATE THE SHADE
 AND FLOWERING TREE REQUIREMENTS OF SECTION 94-443 C. 3.
 TO CURRENT CODE. THE TREE PER 100 SQ FT REQUIREMENT WAS
 REMOVED.
 4/13/22 THERE ARE 4 TERMINAL ISLANDS REQUIRED FOR THE
 SURFACE PARKING AREA, CORRECT ON CHART.
  
 11. SATISFIED. AUSTRALIAN TREE FERN DOES NOT MEET THE
 DEFINITION OF TREE.
  
 12. SATISFIED. SHOW ALL EXISTING AND PROPOSED WATER AND
 SEWER AND DRAINAGE LINES ON THE LANDSCAPE PLAN. SHOW
 LOCATIONS OF BACKFLOWS AND ADJUST LOCATIONS OF UTILITY
 LINES TO RESOLVE CONFLICTS WITH EXISTING AND PROPOSED
 TREES AND LANDSCAPING.
  
 FDC CONNECTIONS SHOULD BE MOVED TO THE BUILDING AND NOT
 BE IN THE STREETSCAPE.
 EXFILTRATION TRENCHES CANNOT BE LOCATED IN THE
 STREETSCAPE AS THEY WILL RESTRICT THE ROOT SPACE
 AVAILABLE FOR THE STREET TREES.
  
 6/27/22 THERE ARE STILL CONFLICTS BETWEEN WATER, FIRE
 AND SEWER LINES IN THE STREETSCAPE AND THE PLAZA IV
 OPEN SPACE.
  
 13. SATISFIED. PLANT LIST NEEDS TO BE MODIFIED TO
 SEPARATE THE REQUIRED OPEN SPACE PLANT LISTS.
  
  
 14. SATISFIED. PROVIDE THE 50 REQUIRED FLORIDA FRIENDLY
 POINTS BASED ON THE FINAL PLANT LIST PER SECTION
 94-443(G). AFTER MAKING THE FOLLOWING CORRECTIONS:
 ??? 2 INDICATE WHERE THE AREAS ARE DESIGNATED.
 ??? 3A AND 3C ARE NOT SUPPORTED BY THE PLANT LIST.
 ??? 5B AND 5D ADD UP TO MORE THAN 100%, MUST REDUCE ONE
 CATEGORY
 ??? 6B IS NOT SUPPORTED BY THE PLAN SUBMITTED
  
  
 15. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L.
 PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT
 MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT
 TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE
 LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH
 FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH
 FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED
 ON THE PLANT LIST.
  
  
 16. SATISFIED. REMOVED FROM PLAN. ALL SURFACE PARKING
 MUST MEET THE REQUIREMENTS OF SECTION 94-443(C)(3) A.
 INCLUDING TERMINAL LANDSCAPE ISLANDS, INTERIOR ISLANDS
 AND SHADE TREES.
 MINIMUM BUFFER WIDTH IS NOT MET.
 17. SATISFIED. REMOVED FROM PLAN. PROVIDE AN EXHIBIT
 SHOWING THE PARKING AREA SURFACE CALCULATIONS, PARKING
 SPACE AREAS AND LANDSCAPE AREAS PROVIDED TO DEMONSTRATE
 COMPLIANCE WITH SECTIONS 94-443 (C)(3) AND (4). PROVIDE
 THE CALCULATIONS IN THE LANDSCAPE REQUIREMENT CHART.
 REFER TO FIGURE XIV-1. SHOW THE ACTUAL PROVIDED
 LANDSCAPE SQUARE FOOTAGE.
 SEE THE REFERENCED FIGURE TO PROVIDE THE EXHIBIT AND
 CORRECT CALCULATIONS.
  
 18. SATISFIED. PROVIDE SCREENING HEDGES AND SHOW
 LOCATIONS FOR ALL GROUND MOUNTED VALVES AND EQUIPMENT
 AND ADD A NOTE THAT ALL EQUIPMENT WILL BE SCREENED.
  
 19. SATISFIED. PORTIONS OF THE RIGHT OF WAY ON BROADWAY
 AND 24TH STREET ARE FDOT RIGHT OF WAY AND ARE SUBJECT
 TO REVIEW AND PERMITTING BY FDOT. PROVIDE PRELIMINARY
 REVIEW OF ANY STREETSCAPE PROPOSED WITHIN THE FDOT
 RIGHT OF WAY.
  
 4/13/22 THIS COMMENT WAS NOT ADDRESSED IN THE RESPONSES
 AS DISCUSSED AT THE PPRC MEETING.
 8/4/22 RESPONSES WERE NOT SHOWN ON THE SUBMITTED
 MATERIAL.
 9/30/22 PRELIMINARY LETTER NEEDS TO BE SUBMITTED.
  
 ADDITIONAL COMMENTS 4/13/22:
 20. SATISFIED. STREET TREES MUST MEET THE MINIMUM CODE
 REQUIREMENT OF 20 FEET ALONG MAIN ROADS, BUT ALL MUST
 BE OF SUFFICIENT HEIGHT TO PROVIDE SAFE SIGHTLINES AND
 TRAFFIC CLEARANCE FOR PEDESTRIANS AND VEHICLES.
 CATHEDRAL LIVE OAKS MUST BE LISTED AT 20 FEET MINIMUM.
  
 21. SATISFIED. STAFF PREFERS THAT THE GUMBO LIMBO
 STREET TREES BE CHANGED TO GREEN BUTTONWOOD DUE TO ROOT
 ISSUES IN CONFINED AREAS.
  
 ADDITIONAL COMMENTS 6/27/22:
 22. SATISFIED. RESPONSES TO LANDSCAPE COMMENTS WERE NOT
 FOUND IN THE RESPONSE MEMO.
  
 23. SATISFIED. SHOW LOCATIONS AND PROVIDE A DETAIL FOR
 STRUCTURAL SOIL UNDER THE SIDEWALK/HARDSCAPE AREAS
 ADJACENT TO THE STREET TREES. THIS SHOULD BE A 9 X 14
 FT AREA FOR EACH TREE ADJACENT TO THE CURB THAT WOULD
 BE PLANTING AREA AND STRUCTURAL SOIL.
  
 ADDITIONAL COMMENTS 9/30/22:
  
 24. SATISFIED. A CODE AMENDMENT IS PENDING REGARDING
 THE REQUIREMENTS FOR PUBLIC OPEN SPACE. IF THE
 AMENDMENT IS APPROVED, STAFF WILL NEED TO REVIEW THE
 PUBLIC OPEN SPACE FOR COMPLIANCE WITH THE NEW CODE.
 ADDITIONAL COMMENT 1/5/23:
 25. MAKE THE FOLLOWING CORRECTIONS TO THE TREE
 DISPOSITION PLAN:
 ??? A ROYAL POINCIANA IS MISSING FROM THE SURVEY AND
 THE TREE DISPOSITION. THE TREE IS LOCATED OPPOSITE TREE
 #22 ON THE EAST SIDE OF BROADWAY BETWEEN THE CURB AND
 SIDEWALK. CALCULATE MITIGATION IF TO BE REMOVED AND
 REVISE THE TOTAL MITIGATION DUE. SUBMIT REVISED PLAN
 FOR THE TREE ALTERATION PERMIT.
  
 ??? TREE #13 THE MAHOGANY IS SHOWN WEST OF WHERE IT
 ACTUALLY EXISTS. LOCATION IS OUTSIDE THE RIGHT OF WAY
 SOUTH OF THE CONCRETE PAD.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF
 WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A
 SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  
  
  
 PROJECT: NORTHWOOD ANCHOR SITE ROW ABANDONMENT
 Z21100023
 NO COMMENTS AT THIS TIME.
  
  
 PROJECT: NORTHWOOD ANCHOR SITE VARIANCES Z21080018
 NO COMMENTS AT THIS TIME.
  

Review Stop L LANDSCAPING
Rev No 5 Status F Date 10-03-2022 Cont ID  
Sent By rcaranci Date 10-03-2022 Time 09:48 Rev Time 0.00
Received By rcaranci Date 10-03-2022 Time 09:48 Sent To  
Notes
2022-10-03 09:49:17FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: NORTHWOOD ANCHOR SITE DSI Z21080015
 SEPTEMBER 30, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 1. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE
 TREES AND PALMS IN GOOD CONDITION TO BE PRESERVED ON
 SITE OR RELOCATED. ANSI A 300 (PART 5) STANDARDS
 SPECIFY EXAMPLES OF SUITABILITY RATINGS OF GOOD,
 MODERATE, OR POOR FOR RELOCATION. PROVIDE AN ARBORISTS
 REPORT RATING THE CONDITION AND RELOCATION POTENTIAL
 FOR THE NATIVE TREES AND PALMS. THERE ARE LIVE OAKS,
 SABAL PALMS, AND ROYAL PALMS THAT ARE INDICATED TO BE
 REMOVED. NON NATIVE TREES AND PALMS ARE NOT REQUIRED TO
 BE RELOCATED.
 2. MAKE THE FOLLOWING CORRECTIONS TO THE TREE
 DISPOSITION LIST:
 ??? SATISFIED. THERE ARE MULTIPLE TREES AND PALMS THAT
 ARE MISIDENTIFIED ON THE TREE DISPOSITION LIST.
 ??? SATISFIED. ONLY TREES PROPOSED TO BE REMOVED WITH A
 CANOPY DIAMETER OF 20 FEET OR MORE SHOULD HAVE THE
 MITIGATION SQUARE FOOTAGE CALCULATED BASED ON THE
 ACTUAL DIAMETER. TREES LESS THAN 20 FEET CANOPY
 DIAMETER AND PALMS SHOULD SHOW THE CATEGORY MITIGATION
 DUE.
 SHOW THE MITIGATION SQUARE FOOTAGE DUE FOR PALMS BY
 CATEGORY (CATEGORY 3 IS 100 SQ FT, CATEGORY 4 IS 50 SQ
 FT.)
 ??? SATISFIED. MULTIPLE PALMS PLANTED TOGETHER MUST
 HAVE EACH SINGLE TRUNK COUNTED TOWARD MITIGATION.
 EXAMPLE: TRIPLE ADONIDIA WOULD BE 3 X 50 SQ FT.
 ??? SATISFIED. PROVIDE THE TOTAL MITIGATION SQUARE
 FOOTAGE DUE.
 PROVIDE THE TOTAL MITIGATION SQUARE FOOTAGE DUE.
 ??? SATISFIED. PROVIDE THE MITIGATION SQUARE FOOTAGE
 PROVIDED BASED ON THE PLANT LIST.
  
 3. SATISFIED. PROVIDE A DIAGRAM OF THE REQUIRED AND
 PROVIDED PUBLIC, SEMI-PUBLIC, PRIVATE OPEN AREAS AND
 URBAN GREENWAYS SYSTEM FOR EACH PARCEL IN THE NMUD
 ZONING DISTRICT. IDENTIFY THE TYPE OF OPEN SPACE. 10%
 COMMON PRIVATE OPEN SPACE IS REQUIRED.
 THE REQUIRED OPEN SPACE NEEDS TO BE QUANTIFIED,
 IDENTIFIED AS TO THE TYPE, AND ALL REQUIREMENTS NEED TO
 BE SHOWN FOR THAT OPEN SPACE TYPE.
 SURFACE PARKING AREAS CANNOT BE COUNTED TOWARD REQUIRED
 OPEN SPACE.
 4/13/22 SHEET A103.0 COULD NOT BE LOCATED IN THE
 SUBMITTAL. SHEET L102 SHOWS SURFACE PARKING AREA
 COUNTED AS LANDSCAPE OPEN SPACE.
  
 4. SATISFIED. SHOW THE ROOFTOP TERRACES AND INCLUDE HOW
 THE REQUIREMENTS OF SECTION 94-210 P. 5. ARE MET,
 INCLUDING 15% LANDSCAPE REQUIREMENT AND PROVIDE A
 LANDSCAPE PLAN FOR EACH AREA.
  
 5. SATISFIED. IDENTIFY RELOCATED TREES OR PALMS ON THE
 PLANT LIST AND COUNT THEM TOWARD THE REQUIRED TREES.
  
 6. SATISFIED. IF ANY ARTIFICIAL TURF AREAS ARE
 PROPOSED, THEY MUST MEET THE REQUIREMENTS OF SECTION
 94-451, INCLUDING ALL AREAS THAT ARE ALLOWED BY CODE
 MUST NOT BE VISIBLE FROM A ROAD OR STREET.
  
 7. SATISFIED. BUFFER TREES AND HEDGES MUST BE PROVIDED
 ALONG ALL BUFFERS. THERE IS A LARGE GAP IN THE TREES
 ADJACENT TO THE WEST OF THE SURFACE PARKING LOT. THE
 WEST PROPERTY LINE ADJACENT TO THE FEC RAILROAD RIGHT
 OF WAY REQUIRES AT LEAST A 5 FOOT BUFFER STRIP PER
 SECTION 94-209 2. F. 1. E.
  
 THE BUFFER ON THE SOUTH SIDE OF THE SURFACE PARKING LOT
 DOES NOT MEET THE REQUIRED WIDTH.
  
 8. SATISFIED. PROVIDE CALCULATIONS FOR REQUIRED STREET
 TREES AT MAXIMUM SPACING EVERY 30 FEET OR PORTION
 THEREOF AND SHOW THE NUMBER PROVIDED FOR EACH
 STREETSCAPE LENGTH. SHOW THE REQUIRED PLANTING STRIP.
  
 4/13/22 EACH BLOCK STREET SEGMENT MUST BE LISTED WITH
 THE TOTAL LENGTH OF THE ADJACENT PROPERTY LINE AND THE
 REQUIRED AND PROVIDED STREET TREES SHOWN. CANNOT
 COMBINE SEGMENTS. THE NUMBER IN SOME SEGMENTS DOES NOT
 MEET CODE. THE OVERALL INTENT IS TO PROVIDE MAXIMUM
 TREE CANOPY COVERAGE FOR ALL SEGMENTS.
  
 6/27/22 THE AREA ALONG 25TH STREET SHOWS A LONG GAP
 BETWEEN TREES WITH UTILITY VALVES AND FIRE HYDRANT.
 THIS NEEDS TO BE SPREAD OUT TO ALLOW TREES TO BE IN
 BETWEEN VALVES.
 STREET TREES ARE NOT SHOWN ON THE NORTHWOOD ROAD
 SEGMENT.
  
 9. SATISFIED. CORRECT THE CODE REQUIREMENTS CHART ON
 SHEET L1.01TO UPDATE THE SHADE AND FLOWERING TREE
 REQUIREMENTS OF SECTION 94-442 C. 2. B. TO CURRENT
 CODE.
  
  
 10. SATISFIED. REMOVED FROM PLAN. CORRECT THE CODE
 REQUIREMENTS CHART ON SHEET L1.01TO UPDATE THE SHADE
 AND FLOWERING TREE REQUIREMENTS OF SECTION 94-443 C. 3.
 TO CURRENT CODE. THE TREE PER 100 SQ FT REQUIREMENT WAS
 REMOVED.
 4/13/22 THERE ARE 4 TERMINAL ISLANDS REQUIRED FOR THE
 SURFACE PARKING AREA, CORRECT ON CHART.
  
 11. SATISFIED. AUSTRALIAN TREE FERN DOES NOT MEET THE
 DEFINITION OF TREE.
  
 12. SATISFIED. SHOW ALL EXISTING AND PROPOSED WATER AND
 SEWER AND DRAINAGE LINES ON THE LANDSCAPE PLAN. SHOW
 LOCATIONS OF BACKFLOWS AND ADJUST LOCATIONS OF UTILITY
 LINES TO RESOLVE CONFLICTS WITH EXISTING AND PROPOSED
 TREES AND LANDSCAPING.
  
 FDC CONNECTIONS SHOULD BE MOVED TO THE BUILDING AND NOT
 BE IN THE STREETSCAPE.
 EXFILTRATION TRENCHES CANNOT BE LOCATED IN THE
 STREETSCAPE AS THEY WILL RESTRICT THE ROOT SPACE
 AVAILABLE FOR THE STREET TREES.
  
 6/27/22 THERE ARE STILL CONFLICTS BETWEEN WATER, FIRE
 AND SEWER LINES IN THE STREETSCAPE AND THE PLAZA IV
 OPEN SPACE.
  
 13. SATISFIED. PLANT LIST NEEDS TO BE MODIFIED TO
 SEPARATE THE REQUIRED OPEN SPACE PLANT LISTS.
  
  
 14. SATISFIED. PROVIDE THE 50 REQUIRED FLORIDA FRIENDLY
 POINTS BASED ON THE FINAL PLANT LIST PER SECTION
 94-443(G). AFTER MAKING THE FOLLOWING CORRECTIONS:
 ??? 2 INDICATE WHERE THE AREAS ARE DESIGNATED.
 ??? 3A AND 3C ARE NOT SUPPORTED BY THE PLANT LIST.
 ??? 5B AND 5D ADD UP TO MORE THAN 100%, MUST REDUCE ONE
 CATEGORY
 ??? 6B IS NOT SUPPORTED BY THE PLAN SUBMITTED
  
  
 15. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L.
 PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT
 MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT
 TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE
 LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH
 FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH
 FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED
 ON THE PLANT LIST.
  
  
 16. SATISFIED. REMOVED FROM PLAN. ALL SURFACE PARKING
 MUST MEET THE REQUIREMENTS OF SECTION 94-443(C)(3) A.
 INCLUDING TERMINAL LANDSCAPE ISLANDS, INTERIOR ISLANDS
 AND SHADE TREES.
 MINIMUM BUFFER WIDTH IS NOT MET.
 17. SATISFIED. REMOVED FROM PLAN. PROVIDE AN EXHIBIT
 SHOWING THE PARKING AREA SURFACE CALCULATIONS, PARKING
 SPACE AREAS AND LANDSCAPE AREAS PROVIDED TO DEMONSTRATE
 COMPLIANCE WITH SECTIONS 94-443 (C)(3) AND (4). PROVIDE
 THE CALCULATIONS IN THE LANDSCAPE REQUIREMENT CHART.
 REFER TO FIGURE XIV-1. SHOW THE ACTUAL PROVIDED
 LANDSCAPE SQUARE FOOTAGE.
 SEE THE REFERENCED FIGURE TO PROVIDE THE EXHIBIT AND
 CORRECT CALCULATIONS.
  
 18. SATISFIED. PROVIDE SCREENING HEDGES AND SHOW
 LOCATIONS FOR ALL GROUND MOUNTED VALVES AND EQUIPMENT
 AND ADD A NOTE THAT ALL EQUIPMENT WILL BE SCREENED.
  
 19. NOT SATISFIED. PORTIONS OF THE RIGHT OF WAY ON
 BROADWAY AND 24TH STREET ARE FDOT RIGHT OF WAY AND ARE
 SUBJECT TO REVIEW AND PERMITTING BY FDOT. PROVIDE
 PRELIMINARY REVIEW OF ANY STREETSCAPE PROPOSED WITHIN
 THE FDOT RIGHT OF WAY.
  
 4/13/22 THIS COMMENT WAS NOT ADDRESSED IN THE RESPONSES
 AS DISCUSSED AT THE PPRC MEETING.
 8/4/22 RESPONSES WERE NOT SHOWN ON THE SUBMITTED
 MATERIAL.
 9/30/22 PRELIMINARY LETTER NEEDS TO BE SUBMITTED.
  
 ADDITIONAL COMMENTS 4/13/22:
 20. SATISFIED. STREET TREES MUST MEET THE MINIMUM CODE
 REQUIREMENT OF 20 FEET ALONG MAIN ROADS, BUT ALL MUST
 BE OF SUFFICIENT HEIGHT TO PROVIDE SAFE SIGHTLINES AND
 TRAFFIC CLEARANCE FOR PEDESTRIANS AND VEHICLES.
 CATHEDRAL LIVE OAKS MUST BE LISTED AT 20 FEET MINIMUM.
  
 21. SATISFIED. STAFF PREFERS THAT THE GUMBO LIMBO
 STREET TREES BE CHANGED TO GREEN BUTTONWOOD DUE TO ROOT
 ISSUES IN CONFINED AREAS.
  
 ADDITIONAL COMMENTS 6/27/22:
 22. SATISFIED. RESPONSES TO LANDSCAPE COMMENTS WERE NOT
 FOUND IN THE RESPONSE MEMO.
  
 23. SATISFIED. SHOW LOCATIONS AND PROVIDE A DETAIL FOR
 STRUCTURAL SOIL UNDER THE SIDEWALK/HARDSCAPE AREAS
 ADJACENT TO THE STREET TREES. THIS SHOULD BE A 9 X 14
 FT AREA FOR EACH TREE ADJACENT TO THE CURB THAT WOULD
 BE PLANTING AREA AND STRUCTURAL SOIL.
  
 ADDITIONAL COMMENTS 9/30/22:
  
 24. A CODE AMENDMENT IS PENDING REGARDING THE
 REQUIREMENTS FOR PUBLIC OPEN SPACE. IF THE AMENDMENT IS
 APPROVED, STAFF WILL NEED TO REVIEW THE PUBLIC OPEN
 SPACE FOR COMPLIANCE WITH THE NEW CODE.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF
 WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A
 SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  
  
  
 PROJECT: NORTHWOOD ANCHOR SITE ROW ABANDONMENT
 Z21100023
 NO COMMENTS AT THIS TIME.
  
  
 PROJECT: NORTHWOOD ANCHOR SITE VARIANCES Z21080018
 NO COMMENTS AT THIS TIME.
  

Review Stop L LANDSCAPING
Rev No 4 Status F Date 08-04-2022 Cont ID  
Sent By rcaranci Date 08-04-2022 Time 16:00 Rev Time 0.00
Received By rcaranci Date 08-04-2022 Time 16:00 Sent To  
Notes
2022-08-04 16:01:09FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: NORTHWOOD ANCHOR SITE DSI Z21080015
 AUGUST 4, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 1. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE
 TREES AND PALMS IN GOOD CONDITION TO BE PRESERVED ON
 SITE OR RELOCATED. ANSI A 300 (PART 5) STANDARDS
 SPECIFY EXAMPLES OF SUITABILITY RATINGS OF GOOD,
 MODERATE, OR POOR FOR RELOCATION. PROVIDE AN ARBORISTS
 REPORT RATING THE CONDITION AND RELOCATION POTENTIAL
 FOR THE NATIVE TREES AND PALMS. THERE ARE LIVE OAKS,
 SABAL PALMS, AND ROYAL PALMS THAT ARE INDICATED TO BE
 REMOVED. NON NATIVE TREES AND PALMS ARE NOT REQUIRED TO
 BE RELOCATED.
 2. MAKE THE FOLLOWING CORRECTIONS TO THE TREE
 DISPOSITION LIST:
 ? SATISFIED. THERE ARE MULTIPLE TREES AND PALMS THAT
 ARE MISIDENTIFIED ON THE TREE DISPOSITION LIST.
 ? SATISFIED. ONLY TREES PROPOSED TO BE REMOVED WITH A
 CANOPY DIAMETER OF 20 FEET OR MORE SHOULD HAVE THE
 MITIGATION SQUARE FOOTAGE CALCULATED BASED ON THE
 ACTUAL DIAMETER. TREES LESS THAN 20 FEET CANOPY
 DIAMETER AND PALMS SHOULD SHOW THE CATEGORY MITIGATION
 DUE.
 SHOW THE MITIGATION SQUARE FOOTAGE DUE FOR PALMS BY
 CATEGORY (CATEGORY 3 IS 100 SQ FT, CATEGORY 4 IS 50 SQ
 FT.)
 ? SATISFIED. MULTIPLE PALMS PLANTED TOGETHER MUST HAVE
 EACH SINGLE TRUNK COUNTED TOWARD MITIGATION. EXAMPLE:
 TRIPLE ADONIDIA WOULD BE 3 X 50 SQ FT.
 ? SATISFIED. PROVIDE THE TOTAL MITIGATION SQUARE
 FOOTAGE DUE.
 PROVIDE THE TOTAL MITIGATION SQUARE FOOTAGE DUE.
 ? SATISFIED. PROVIDE THE MITIGATION SQUARE FOOTAGE
 PROVIDED BASED ON THE PLANT LIST.
  
 3. SATISFIED. PROVIDE A DIAGRAM OF THE REQUIRED AND
 PROVIDED PUBLIC, SEMI-PUBLIC, PRIVATE OPEN AREAS AND
 URBAN GREENWAYS SYSTEM FOR EACH PARCEL IN THE NMUD
 ZONING DISTRICT. IDENTIFY THE TYPE OF OPEN SPACE. 10%
 COMMON PRIVATE OPEN SPACE IS REQUIRED.
 THE REQUIRED OPEN SPACE NEEDS TO BE QUANTIFIED,
 IDENTIFIED AS TO THE TYPE, AND ALL REQUIREMENTS NEED TO
 BE SHOWN FOR THAT OPEN SPACE TYPE.
 SURFACE PARKING AREAS CANNOT BE COUNTED TOWARD REQUIRED
 OPEN SPACE.
 4/13/22 SHEET A103.0 COULD NOT BE LOCATED IN THE
 SUBMITTAL. SHEET L102 SHOWS SURFACE PARKING AREA
 COUNTED AS LANDSCAPE OPEN SPACE.
  
 4. SATISFIED. SHOW THE ROOFTOP TERRACES AND INCLUDE HOW
 THE REQUIREMENTS OF SECTION 94-210 P. 5. ARE MET,
 INCLUDING 15% LANDSCAPE REQUIREMENT AND PROVIDE A
 LANDSCAPE PLAN FOR EACH AREA.
  
 5. SATISFIED. IDENTIFY RELOCATED TREES OR PALMS ON THE
 PLANT LIST AND COUNT THEM TOWARD THE REQUIRED TREES.
  
 6. SATISFIED. IF ANY ARTIFICIAL TURF AREAS ARE
 PROPOSED, THEY MUST MEET THE REQUIREMENTS OF SECTION
 94-451, INCLUDING ALL AREAS THAT ARE ALLOWED BY CODE
 MUST NOT BE VISIBLE FROM A ROAD OR STREET.
  
 7. SATISFIED. BUFFER TREES AND HEDGES MUST BE PROVIDED
 ALONG ALL BUFFERS. THERE IS A LARGE GAP IN THE TREES
 ADJACENT TO THE WEST OF THE SURFACE PARKING LOT. THE
 WEST PROPERTY LINE ADJACENT TO THE FEC RAILROAD RIGHT
 OF WAY REQUIRES AT LEAST A 5 FOOT BUFFER STRIP PER
 SECTION 94-209 2. F. 1. E.
  
 THE BUFFER ON THE SOUTH SIDE OF THE SURFACE PARKING LOT
 DOES NOT MEET THE REQUIRED WIDTH.
  
 8. SATISFIED. PROVIDE CALCULATIONS FOR REQUIRED STREET
 TREES AT MAXIMUM SPACING EVERY 30 FEET OR PORTION
 THEREOF AND SHOW THE NUMBER PROVIDED FOR EACH
 STREETSCAPE LENGTH. SHOW THE REQUIRED PLANTING STRIP.
  
 4/13/22 EACH BLOCK STREET SEGMENT MUST BE LISTED WITH
 THE TOTAL LENGTH OF THE ADJACENT PROPERTY LINE AND THE
 REQUIRED AND PROVIDED STREET TREES SHOWN. CANNOT
 COMBINE SEGMENTS. THE NUMBER IN SOME SEGMENTS DOES NOT
 MEET CODE. THE OVERALL INTENT IS TO PROVIDE MAXIMUM
 TREE CANOPY COVERAGE FOR ALL SEGMENTS.
  
 6/27/22 THE AREA ALONG 25TH STREET SHOWS A LONG GAP
 BETWEEN TREES WITH UTILITY VALVES AND FIRE HYDRANT.
 THIS NEEDS TO BE SPREAD OUT TO ALLOW TREES TO BE IN
 BETWEEN VALVES.
 STREET TREES ARE NOT SHOWN ON THE NORTHWOOD ROAD
 SEGMENT.
  
 9. SATISFIED. CORRECT THE CODE REQUIREMENTS CHART ON
 SHEET L1.01TO UPDATE THE SHADE AND FLOWERING TREE
 REQUIREMENTS OF SECTION 94-442 C. 2. B. TO CURRENT
 CODE.
  
  
 10. SATISFIED. REMOVED FROM PLAN. CORRECT THE CODE
 REQUIREMENTS CHART ON SHEET L1.01TO UPDATE THE SHADE
 AND FLOWERING TREE REQUIREMENTS OF SECTION 94-443 C. 3.
 TO CURRENT CODE. THE TREE PER 100 SQ FT REQUIREMENT WAS
 REMOVED.
 4/13/22 THERE ARE 4 TERMINAL ISLANDS REQUIRED FOR THE
 SURFACE PARKING AREA, CORRECT ON CHART.
  
 11. SATISFIED. AUSTRALIAN TREE FERN DOES NOT MEET THE
 DEFINITION OF TREE.
  
 12. SATISFIED. SHOW ALL EXISTING AND PROPOSED WATER AND
 SEWER AND DRAINAGE LINES ON THE LANDSCAPE PLAN. SHOW
 LOCATIONS OF BACKFLOWS AND ADJUST LOCATIONS OF UTILITY
 LINES TO RESOLVE CONFLICTS WITH EXISTING AND PROPOSED
 TREES AND LANDSCAPING.
  
 FDC CONNECTIONS SHOULD BE MOVED TO THE BUILDING AND NOT
 BE IN THE STREETSCAPE.
 EXFILTRATION TRENCHES CANNOT BE LOCATED IN THE
 STREETSCAPE AS THEY WILL RESTRICT THE ROOT SPACE
 AVAILABLE FOR THE STREET TREES.
  
 6/27/22 THERE ARE STILL CONFLICTS BETWEEN WATER, FIRE
 AND SEWER LINES IN THE STREETSCAPE AND THE PLAZA IV
 OPEN SPACE.
  
 13. SATISFIED. PLANT LIST NEEDS TO BE MODIFIED TO
 SEPARATE THE REQUIRED OPEN SPACE PLANT LISTS.
  
  
 14. SATISFIED. PROVIDE THE 50 REQUIRED FLORIDA FRIENDLY
 POINTS BASED ON THE FINAL PLANT LIST PER SECTION
 94-443(G). AFTER MAKING THE FOLLOWING CORRECTIONS:
 ? 2 INDICATE WHERE THE AREAS ARE DESIGNATED.
 ? 3A AND 3C ARE NOT SUPPORTED BY THE PLANT LIST.
 ? 5B AND 5D ADD UP TO MORE THAN 100%, MUST REDUCE ONE
 CATEGORY
 ? 6B IS NOT SUPPORTED BY THE PLAN SUBMITTED
  
  
 15. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L.
 PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT
 MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT
 TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE
 LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH
 FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH
 FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED
 ON THE PLANT LIST.
  
  
 16. SATISFIED. REMOVED FROM PLAN. ALL SURFACE PARKING
 MUST MEET THE REQUIREMENTS OF SECTION 94-443(C)(3) A.
 INCLUDING TERMINAL LANDSCAPE ISLANDS, INTERIOR ISLANDS
 AND SHADE TREES.
 MINIMUM BUFFER WIDTH IS NOT MET.
 17. SATISFIED. REMOVED FROM PLAN. PROVIDE AN EXHIBIT
 SHOWING THE PARKING AREA SURFACE CALCULATIONS, PARKING
 SPACE AREAS AND LANDSCAPE AREAS PROVIDED TO DEMONSTRATE
 COMPLIANCE WITH SECTIONS 94-443 (C)(3) AND (4). PROVIDE
 THE CALCULATIONS IN THE LANDSCAPE REQUIREMENT CHART.
 REFER TO FIGURE XIV-1. SHOW THE ACTUAL PROVIDED
 LANDSCAPE SQUARE FOOTAGE.
 SEE THE REFERENCED FIGURE TO PROVIDE THE EXHIBIT AND
 CORRECT CALCULATIONS.
  
 18. SATISFIED. PROVIDE SCREENING HEDGES AND SHOW
 LOCATIONS FOR ALL GROUND MOUNTED VALVES AND EQUIPMENT
 AND ADD A NOTE THAT ALL EQUIPMENT WILL BE SCREENED.
  
 19. NOT SATISFIED. PORTIONS OF THE RIGHT OF WAY ON
 BROADWAY AND 24TH STREET ARE FDOT RIGHT OF WAY AND ARE
 SUBJECT TO REVIEW AND PERMITTING BY FDOT. PROVIDE
 PRELIMINARY REVIEW OF ANY STREETSCAPE PROPOSED WITHIN
 THE FDOT RIGHT OF WAY.
  
 4/13/22 THIS COMMENT WAS NOT ADDRESSED IN THE RESPONSES
 AS DISCUSSED AT THE PPRC MEETING.
 8/4/22 RESPONSES WERE NOT SHOWN ON THE SUBMITTED
 MATERIAL.
  
 ADDITIONAL COMMENTS 4/13/22:
 20. SATISFIED. STREET TREES MUST MEET THE MINIMUM CODE
 REQUIREMENT OF 20 FEET ALONG MAIN ROADS, BUT ALL MUST
 BE OF SUFFICIENT HEIGHT TO PROVIDE SAFE SIGHTLINES AND
 TRAFFIC CLEARANCE FOR PEDESTRIANS AND VEHICLES.
 CATHEDRAL LIVE OAKS MUST BE LISTED AT 20 FEET MINIMUM.
  
 21. SATISFIED. STAFF PREFERS THAT THE GUMBO LIMBO
 STREET TREES BE CHANGED TO GREEN BUTTONWOOD DUE TO ROOT
 ISSUES IN CONFINED AREAS.
  
 ADDITIONAL COMMENTS 6/27/22:
 22. NOT SATISFIED. RESPONSES TO LANDSCAPE COMMENTS WERE
 NOT FOUND IN THE RESPONSE MEMO.
  
 23. SATISFIED. SHOW LOCATIONS AND PROVIDE A DETAIL FOR
 STRUCTURAL SOIL UNDER THE SIDEWALK/HARDSCAPE AREAS
 ADJACENT TO THE STREET TREES. THIS SHOULD BE A 9 X 14
 FT AREA FOR EACH TREE ADJACENT TO THE CURB THAT WOULD
 BE PLANTING AREA AND STRUCTURAL SOIL.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF
 WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A
 SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  
  
  
 PROJECT: NORTHWOOD ANCHOR SITE ROW ABANDONMENT
 Z21100023
 NO COMMENTS AT THIS TIME.
  
  
 PROJECT: NORTHWOOD ANCHOR SITE VARIANCES Z21080018
 NO COMMENTS AT THIS TIME.
  

Review Stop L LANDSCAPING
Rev No 3 Status F Date 06-27-2022 Cont ID  
Sent By rcaranci Date 06-27-2022 Time 12:36 Rev Time 0.00
Received By rcaranci Date 06-27-2022 Time 12:36 Sent To  
Notes
2022-06-27 12:37:37FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: NORTHWOOD ANCHOR SITE DSI Z21080015
 JUNE 27, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 1. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE
 TREES AND PALMS IN GOOD CONDITION TO BE PRESERVED ON
 SITE OR RELOCATED. ANSI A 300 (PART 5) STANDARDS
 SPECIFY EXAMPLES OF SUITABILITY RATINGS OF GOOD,
 MODERATE, OR POOR FOR RELOCATION. PROVIDE AN ARBORISTS
 REPORT RATING THE CONDITION AND RELOCATION POTENTIAL
 FOR THE NATIVE TREES AND PALMS. THERE ARE LIVE OAKS,
 SABAL PALMS, AND ROYAL PALMS THAT ARE INDICATED TO BE
 REMOVED. NON NATIVE TREES AND PALMS ARE NOT REQUIRED TO
 BE RELOCATED.
 2. MAKE THE FOLLOWING CORRECTIONS TO THE TREE
 DISPOSITION LIST:
 ? SATISFIED. THERE ARE MULTIPLE TREES AND PALMS THAT
 ARE MISIDENTIFIED ON THE TREE DISPOSITION LIST.
 ? SATISFIED. ONLY TREES PROPOSED TO BE REMOVED WITH A
 CANOPY DIAMETER OF 20 FEET OR MORE SHOULD HAVE THE
 MITIGATION SQUARE FOOTAGE CALCULATED BASED ON THE
 ACTUAL DIAMETER. TREES LESS THAN 20 FEET CANOPY
 DIAMETER AND PALMS SHOULD SHOW THE CATEGORY MITIGATION
 DUE.
 SHOW THE MITIGATION SQUARE FOOTAGE DUE FOR PALMS BY
 CATEGORY (CATEGORY 3 IS 100 SQ FT, CATEGORY 4 IS 50 SQ
 FT.)
 ? SATISFIED. MULTIPLE PALMS PLANTED TOGETHER MUST HAVE
 EACH SINGLE TRUNK COUNTED TOWARD MITIGATION. EXAMPLE:
 TRIPLE ADONIDIA WOULD BE 3 X 50 SQ FT.
 ? PARTIALLY SATISFIED. PROVIDE THE TOTAL MITIGATION
 SQUARE FOOTAGE DUE.
 PROVIDE THE TOTAL MITIGATION SQUARE FOOTAGE DUE.
 ? SATISFIED. PROVIDE THE MITIGATION SQUARE FOOTAGE
 PROVIDED BASED ON THE PLANT LIST.
  
 3. SATISFIED. PROVIDE A DIAGRAM OF THE REQUIRED AND
 PROVIDED PUBLIC, SEMI-PUBLIC, PRIVATE OPEN AREAS AND
 URBAN GREENWAYS SYSTEM FOR EACH PARCEL IN THE NMUD
 ZONING DISTRICT. IDENTIFY THE TYPE OF OPEN SPACE. 10%
 COMMON PRIVATE OPEN SPACE IS REQUIRED.
 THE REQUIRED OPEN SPACE NEEDS TO BE QUANTIFIED,
 IDENTIFIED AS TO THE TYPE, AND ALL REQUIREMENTS NEED TO
 BE SHOWN FOR THAT OPEN SPACE TYPE.
 SURFACE PARKING AREAS CANNOT BE COUNTED TOWARD REQUIRED
 OPEN SPACE.
 4/13/22 SHEET A103.0 COULD NOT BE LOCATED IN THE
 SUBMITTAL. SHEET L102 SHOWS SURFACE PARKING AREA
 COUNTED AS LANDSCAPE OPEN SPACE.
  
 4. SATISFIED. SHOW THE ROOFTOP TERRACES AND INCLUDE HOW
 THE REQUIREMENTS OF SECTION 94-210 P. 5. ARE MET,
 INCLUDING 15% LANDSCAPE REQUIREMENT AND PROVIDE A
 LANDSCAPE PLAN FOR EACH AREA.
  
 5. SATISFIED. IDENTIFY RELOCATED TREES OR PALMS ON THE
 PLANT LIST AND COUNT THEM TOWARD THE REQUIRED TREES.
  
 6. SATISFIED. IF ANY ARTIFICIAL TURF AREAS ARE
 PROPOSED, THEY MUST MEET THE REQUIREMENTS OF SECTION
 94-451, INCLUDING ALL AREAS THAT ARE ALLOWED BY CODE
 MUST NOT BE VISIBLE FROM A ROAD OR STREET.
  
 7. SATISFIED. BUFFER TREES AND HEDGES MUST BE PROVIDED
 ALONG ALL BUFFERS. THERE IS A LARGE GAP IN THE TREES
 ADJACENT TO THE WEST OF THE SURFACE PARKING LOT. THE
 WEST PROPERTY LINE ADJACENT TO THE FEC RAILROAD RIGHT
 OF WAY REQUIRES AT LEAST A 5 FOOT BUFFER STRIP PER
 SECTION 94-209 2. F. 1. E.
  
 THE BUFFER ON THE SOUTH SIDE OF THE SURFACE PARKING LOT
 DOES NOT MEET THE REQUIRED WIDTH.
  
 8. PARTIALLY SATISFIED. PROVIDE CALCULATIONS FOR
 REQUIRED STREET TREES AT MAXIMUM SPACING EVERY 30 FEET
 OR PORTION THEREOF AND SHOW THE NUMBER PROVIDED FOR
 EACH STREETSCAPE LENGTH. SHOW THE REQUIRED PLANTING
 STRIP.
  
 4/13/22 EACH BLOCK STREET SEGMENT MUST BE LISTED WITH
 THE TOTAL LENGTH OF THE ADJACENT PROPERTY LINE AND THE
 REQUIRED AND PROVIDED STREET TREES SHOWN. CANNOT
 COMBINE SEGMENTS. THE NUMBER IN SOME SEGMENTS DOES NOT
 MEET CODE. THE OVERALL INTENT IS TO PROVIDE MAXIMUM
 TREE CANOPY COVERAGE FOR ALL SEGMENTS.
  
 6/27/22 THE AREA ALONG 25TH STREET SHOWS A LONG GAP
 BETWEEN TREES WITH UTILITY VALVES AND FIRE HYDRANT.
 THIS NEEDS TO BE SPREAD OUT TO ALLOW TREES TO BE IN
 BETWEEN VALVES.
 STREET TREES ARE NOT SHOWN ON THE NORTHWOOD ROAD
 SEGMENT.
  
 9. SATISFIED. CORRECT THE CODE REQUIREMENTS CHART ON
 SHEET L1.01TO UPDATE THE SHADE AND FLOWERING TREE
 REQUIREMENTS OF SECTION 94-442 C. 2. B. TO CURRENT
 CODE.
  
  
 10. SATISFIED. REMOVED FROM PLAN. CORRECT THE CODE
 REQUIREMENTS CHART ON SHEET L1.01TO UPDATE THE SHADE
 AND FLOWERING TREE REQUIREMENTS OF SECTION 94-443 C. 3.
 TO CURRENT CODE. THE TREE PER 100 SQ FT REQUIREMENT WAS
 REMOVED.
 4/13/22 THERE ARE 4 TERMINAL ISLANDS REQUIRED FOR THE
 SURFACE PARKING AREA, CORRECT ON CHART.
  
 11. SATISFIED. AUSTRALIAN TREE FERN DOES NOT MEET THE
 DEFINITION OF TREE.
  
 12. PARTIALLY SATISFIED. SHOW ALL EXISTING AND PROPOSED
 WATER AND SEWER AND DRAINAGE LINES ON THE LANDSCAPE
 PLAN. SHOW LOCATIONS OF BACKFLOWS AND ADJUST LOCATIONS
 OF UTILITY LINES TO RESOLVE CONFLICTS WITH EXISTING AND
 PROPOSED TREES AND LANDSCAPING.
  
 FDC CONNECTIONS SHOULD BE MOVED TO THE BUILDING AND NOT
 BE IN THE STREETSCAPE.
 EXFILTRATION TRENCHES CANNOT BE LOCATED IN THE
 STREETSCAPE AS THEY WILL RESTRICT THE ROOT SPACE
 AVAILABLE FOR THE STREET TREES.
  
 6/27/22 THERE ARE STILL CONFLICTS BETWEEN WATER, FIRE
 AND SEWER LINES IN THE STREETSCAPE AND THE PLAZA IV
 OPEN SPACE.
  
 13. SATISFIED. PLANT LIST NEEDS TO BE MODIFIED TO
 SEPARATE THE REQUIRED OPEN SPACE PLANT LISTS.
  
  
 14. SATISFIED. PROVIDE THE 50 REQUIRED FLORIDA FRIENDLY
 POINTS BASED ON THE FINAL PLANT LIST PER SECTION
 94-443(G). AFTER MAKING THE FOLLOWING CORRECTIONS:
 ? 2 INDICATE WHERE THE AREAS ARE DESIGNATED.
 ? 3A AND 3C ARE NOT SUPPORTED BY THE PLANT LIST.
 ? 5B AND 5D ADD UP TO MORE THAN 100%, MUST REDUCE ONE
 CATEGORY
 ? 6B IS NOT SUPPORTED BY THE PLAN SUBMITTED
  
  
 15. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L.
 PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT
 MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT
 TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE
 LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH
 FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH
 FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED
 ON THE PLANT LIST.
  
  
 16. SATISFIED. REMOVED FROM PLAN. ALL SURFACE PARKING
 MUST MEET THE REQUIREMENTS OF SECTION 94-443(C)(3) A.
 INCLUDING TERMINAL LANDSCAPE ISLANDS, INTERIOR ISLANDS
 AND SHADE TREES.
 MINIMUM BUFFER WIDTH IS NOT MET.
 17. SATISFIED. REMOVED FROM PLAN. PROVIDE AN EXHIBIT
 SHOWING THE PARKING AREA SURFACE CALCULATIONS, PARKING
 SPACE AREAS AND LANDSCAPE AREAS PROVIDED TO DEMONSTRATE
 COMPLIANCE WITH SECTIONS 94-443 (C)(3) AND (4). PROVIDE
 THE CALCULATIONS IN THE LANDSCAPE REQUIREMENT CHART.
 REFER TO FIGURE XIV-1. SHOW THE ACTUAL PROVIDED
 LANDSCAPE SQUARE FOOTAGE.
 SEE THE REFERENCED FIGURE TO PROVIDE THE EXHIBIT AND
 CORRECT CALCULATIONS.
  
 18. SATISFIED. PROVIDE SCREENING HEDGES AND SHOW
 LOCATIONS FOR ALL GROUND MOUNTED VALVES AND EQUIPMENT
 AND ADD A NOTE THAT ALL EQUIPMENT WILL BE SCREENED.
  
 19. NOT SATISFIED. PORTIONS OF THE RIGHT OF WAY ON
 BROADWAY AND 24TH STREET ARE FDOT RIGHT OF WAY AND ARE
 SUBJECT TO REVIEW AND PERMITTING BY FDOT. PROVIDE
 PRELIMINARY REVIEW OF ANY STREETSCAPE PROPOSED WITHIN
 THE FDOT RIGHT OF WAY.
  
 4/13/22 THIS COMMENT WAS NOT ADDRESSED IN THE RESPONSES
 AS DISCUSSED AT THE PPRC MEETING.
  
 ADDITIONAL COMMENTS 4/13/22:
 20. PARTIALLY SATISFIED. STREET TREES MUST MEET THE
 MINIMUM CODE REQUIREMENT OF 20 FEET ALONG MAIN ROADS,
 BUT ALL MUST BE OF SUFFICIENT HEIGHT TO PROVIDE SAFE
 SIGHTLINES AND TRAFFIC CLEARANCE FOR PEDESTRIANS AND
 VEHICLES.
 CATHEDRAL LIVE OAKS MUST BE LISTED AT 20 FEET MINIMUM.
  
 21. SATISFIED. STAFF PREFERS THAT THE GUMBO LIMBO
 STREET TREES BE CHANGED TO GREEN BUTTONWOOD DUE TO ROOT
 ISSUES IN CONFINED AREAS.
  
 ADDITIONAL COMMENTS 6/27/22:
 22. RESPONSES TO LANDSCAPE COMMENTS WERE NOT FOUND IN
 THE RESPONSE MEMO.
  
 23. SHOW LOCATIONS AND PROVIDE A DETAIL FOR STRUCTURAL
 SOIL UNDER THE SIDEWALK/HARDSCAPE AREAS ADJACENT TO THE
 STREET TREES. THIS SHOULD BE A 9 X 14 FT AREA FOR EACH
 TREE ADJACENT TO THE CURB THAT WOULD BE PLANTING AREA
 AND STRUCTURAL SOIL.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF
 WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A
 SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  
  
  
 PROJECT: NORTHWOOD ANCHOR SITE ROW ABANDONMENT
 Z21100023
 NO COMMENTS AT THIS TIME.
  
  
 PROJECT: NORTHWOOD ANCHOR SITE VARIANCES Z21080018
 NO COMMENTS AT THIS TIME.
  
  

Review Stop L LANDSCAPING
Rev No 2 Status F Date 04-13-2022 Cont ID  
Sent By rcaranci Date 04-13-2022 Time 17:40 Rev Time 0.00
Received By rcaranci Date 04-13-2022 Time 17:40 Sent To  
Notes
2022-04-13 17:41:26FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: NORTHWOOD ANCHOR SITE DSI Z21080015
 APRIL 13, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 1. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE
 TREES AND PALMS IN GOOD CONDITION TO BE PRESERVED ON
 SITE OR RELOCATED. ANSI A 300 (PART 5) STANDARDS
 SPECIFY EXAMPLES OF SUITABILITY RATINGS OF GOOD,
 MODERATE, OR POOR FOR RELOCATION. PROVIDE AN ARBORISTS
 REPORT RATING THE CONDITION AND RELOCATION POTENTIAL
 FOR THE NATIVE TREES AND PALMS. THERE ARE LIVE OAKS,
 SABAL PALMS, AND ROYAL PALMS THAT ARE INDICATED TO BE
 REMOVED. NON NATIVE TREES AND PALMS ARE NOT REQUIRED TO
 BE RELOCATED.
 2. MAKE THE FOLLOWING CORRECTIONS TO THE TREE
 DISPOSITION LIST:
 ? SATISFIED. THERE ARE MULTIPLE TREES AND PALMS THAT
 ARE MISIDENTIFIED ON THE TREE DISPOSITION LIST.
 ? PARTIALLY SATISFIED. ONLY TREES PROPOSED TO BE
 REMOVED WITH A CANOPY DIAMETER OF 20 FEET OR MORE
 SHOULD HAVE THE MITIGATION SQUARE FOOTAGE CALCULATED
 BASED ON THE ACTUAL DIAMETER. TREES LESS THAN 20 FEET
 CANOPY DIAMETER AND PALMS SHOULD SHOW THE CATEGORY
 MITIGATION DUE.
 SHOW THE MITIGATION SQUARE FOOTAGE DUE FOR PALMS BY
 CATEGORY (CATEGORY 3 IS 100 SQ FT, CATEGORY 4 IS 50 SQ
 FT.)
 ? SATISFIED. MULTIPLE PALMS PLANTED TOGETHER MUST HAVE
 EACH SINGLE TRUNK COUNTED TOWARD MITIGATION. EXAMPLE:
 TRIPLE ADONIDIA WOULD BE 3 X 50 SQ FT.
 ? SATISFIED. PROVIDE THE TOTAL MITIGATION SQUARE
 FOOTAGE DUE.
 PROVIDE THE TOTAL MITIGATION SQUARE FOOTAGE DUE.
 ? SATISFIED. PROVIDE THE MITIGATION SQUARE FOOTAGE
 PROVIDED BASED ON THE PLANT LIST.
  
 3. NOT SATISFIED. PROVIDE A DIAGRAM OF THE REQUIRED AND
 PROVIDED PUBLIC, SEMI-PUBLIC, PRIVATE OPEN AREAS AND
 URBAN GREENWAYS SYSTEM FOR EACH PARCEL IN THE NMUD
 ZONING DISTRICT. IDENTIFY THE TYPE OF OPEN SPACE. 10%
 COMMON PRIVATE OPEN SPACE IS REQUIRED.
 THE REQUIRED OPEN SPACE NEEDS TO BE QUANTIFIED,
 IDENTIFIED AS TO THE TYPE, AND ALL REQUIREMENTS NEED TO
 BE SHOWN FOR THAT OPEN SPACE TYPE.
 SURFACE PARKING AREAS CANNOT BE COUNTED TOWARD REQUIRED
 OPEN SPACE.
 4/13/22 SHEET A103.0 COULD NOT BE LOCATED IN THE
 SUBMITTAL. SHEET L102 SHOWS SURFACE PARKING AREA
 COUNTED AS LANDSCAPE OPEN SPACE.
  
 4. SATISFIED. SHOW THE ROOFTOP TERRACES AND INCLUDE HOW
 THE REQUIREMENTS OF SECTION 94-210 P. 5. ARE MET,
 INCLUDING 15% LANDSCAPE REQUIREMENT AND PROVIDE A
 LANDSCAPE PLAN FOR EACH AREA.
  
 5. SATISFIED. IDENTIFY RELOCATED TREES OR PALMS ON THE
 PLANT LIST AND COUNT THEM TOWARD THE REQUIRED TREES.
  
 6. SATISFIED. IF ANY ARTIFICIAL TURF AREAS ARE
 PROPOSED, THEY MUST MEET THE REQUIREMENTS OF SECTION
 94-451, INCLUDING ALL AREAS THAT ARE ALLOWED BY CODE
 MUST NOT BE VISIBLE FROM A ROAD OR STREET.
  
 7. PARTIALLY SATISFIED. BUFFER TREES AND HEDGES MUST BE
 PROVIDED ALONG ALL BUFFERS. THERE IS A LARGE GAP IN THE
 TREES ADJACENT TO THE WEST OF THE SURFACE PARKING LOT.
 THE WEST PROPERTY LINE ADJACENT TO THE FEC RAILROAD
 RIGHT OF WAY REQUIRES AT LEAST A 5 FOOT BUFFER STRIP
 PER SECTION 94-209 2. F. 1. E.
  
 THE BUFFER ON THE SOUTH SIDE OF THE SURFACE PARKING LOT
 DOES NOT MEET THE REQUIRED WIDTH.
  
 8. PARTIALLY SATISFIED. PROVIDE CALCULATIONS FOR
 REQUIRED STREET TREES AT MAXIMUM SPACING EVERY 30 FEET
 OR PORTION THEREOF AND SHOW THE NUMBER PROVIDED FOR
 EACH STREETSCAPE LENGTH. SHOW THE REQUIRED PLANTING
 STRIP.
  
 4/13/22 EACH BLOCK STREET SEGMENT MUST BE LISTED WITH
 THE TOTAL LENGTH OF THE ADJACENT PROPERTY LINE AND THE
 REQUIRED AND PROVIDED STREET TREES SHOWN. CANNOT
 COMBINE SEGMENTS. THE NUMBER IN SOME SEGMENTS DOES NOT
 MEET CODE. THE OVERALL INTENT IS TO PROVIDE MAXIMUM
 TREE CANOPY COVERAGE FOR ALL SEGMENTS.
  
 9. SATISFIED. CORRECT THE CODE REQUIREMENTS CHART ON
 SHEET L1.01TO UPDATE THE SHADE AND FLOWERING TREE
 REQUIREMENTS OF SECTION 94-442 C. 2. B. TO CURRENT
 CODE.
  
  
 10. PARTIALLY SATISFIED. CORRECT THE CODE REQUIREMENTS
 CHART ON SHEET L1.01TO UPDATE THE SHADE AND FLOWERING
 TREE REQUIREMENTS OF SECTION 94-443 C. 3. TO CURRENT
 CODE. THE TREE PER 100 SQ FT REQUIREMENT WAS REMOVED.
 4/13/22 THERE ARE 4 TERMINAL ISLANDS REQUIRED FOR THE
 SURFACE PARKING AREA, CORRECT ON CHART.
  
 11. SATISFIED. AUSTRALIAN TREE FERN DOES NOT MEET THE
 DEFINITION OF TREE.
  
 12. PARTIALLY SATISFIED. SHOW ALL EXISTING AND PROPOSED
 WATER AND SEWER AND DRAINAGE LINES ON THE LANDSCAPE
 PLAN. SHOW LOCATIONS OF BACKFLOWS AND ADJUST LOCATIONS
 OF UTILITY LINES TO RESOLVE CONFLICTS WITH EXISTING AND
 PROPOSED TREES AND LANDSCAPING.
  
 FDC CONNECTIONS SHOULD BE MOVED TO THE BUILDING AND NOT
 BE IN THE STREETSCAPE.
 EXFILTRATION TRENCHES CANNOT BE LOCATED IN THE
 STREETSCAPE AS THEY WILL RESTRICT THE ROOT SPACE
 AVAILABLE FOR THE STREET TREES.
  
 13. SATISFIED. PLANT LIST NEEDS TO BE MODIFIED TO
 SEPARATE THE REQUIRED OPEN SPACE PLANT LISTS.
  
  
 14. SATISFIED. PROVIDE THE 50 REQUIRED FLORIDA FRIENDLY
 POINTS BASED ON THE FINAL PLANT LIST PER SECTION
 94-443(G). AFTER MAKING THE FOLLOWING CORRECTIONS:
 ? 2 INDICATE WHERE THE AREAS ARE DESIGNATED.
 ? 3A AND 3C ARE NOT SUPPORTED BY THE PLANT LIST.
 ? 5B AND 5D ADD UP TO MORE THAN 100%, MUST REDUCE ONE
 CATEGORY
 ? 6B IS NOT SUPPORTED BY THE PLAN SUBMITTED
  
  
 15. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L.
 PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT
 MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT
 TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE
 LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH
 FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH
 FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED
 ON THE PLANT LIST.
  
  
 16. PARTIALLY SATISFIED. ALL SURFACE PARKING MUST MEET
 THE REQUIREMENTS OF SECTION 94-443(C)(3) A. INCLUDING
 TERMINAL LANDSCAPE ISLANDS, INTERIOR ISLANDS AND SHADE
 TREES.
 MINIMUM BUFFER WIDTH IS NOT MET.
 17. NOT SATISFIED. PROVIDE AN EXHIBIT SHOWING THE
 PARKING AREA SURFACE CALCULATIONS, PARKING SPACE AREAS
 AND LANDSCAPE AREAS PROVIDED TO DEMONSTRATE COMPLIANCE
 WITH SECTIONS 94-443 (C)(3) AND (4). PROVIDE THE
 CALCULATIONS IN THE LANDSCAPE REQUIREMENT CHART. REFER
 TO FIGURE XIV-1. SHOW THE ACTUAL PROVIDED LANDSCAPE
 SQUARE FOOTAGE.
 SEE THE REFERENCED FIGURE TO PROVIDE THE EXHIBIT AND
 CORRECT CALCULATIONS.
  
 18. SATISFIED. PROVIDE SCREENING HEDGES AND SHOW
 LOCATIONS FOR ALL GROUND MOUNTED VALVES AND EQUIPMENT
 AND ADD A NOTE THAT ALL EQUIPMENT WILL BE SCREENED.
  
 19. NOT SATISFIED. PORTIONS OF THE RIGHT OF WAY ON
 BROADWAY AND 24TH STREET ARE FDOT RIGHT OF WAY AND ARE
 SUBJECT TO REVIEW AND PERMITTING BY FDOT. PROVIDE
 PRELIMINARY REVIEW OF ANY STREETSCAPE PROPOSED WITHIN
 THE FDOT RIGHT OF WAY.
  
 4/13/22 THIS COMMENT WAS NOT ADDRESSED IN THE RESPONSES
 AS DISCUSSED AT THE PPRC MEETING.
  
 ADDITIONAL COMMENTS 4/13/22:
 20. STREET TREES MUST MEET THE MINIMUM CODE REQUIREMENT
 OF 20 FEET ALONG MAIN ROADS, BUT ALL MUST BE OF
 SUFFICIENT HEIGHT TO PROVIDE SAFE SIGHTLINES AND
 TRAFFIC CLEARANCE FOR PEDESTRIANS AND VEHICLES.
  
 21. STAFF PREFERS THAT THE GUMBO LIMBO STREET TREES BE
 CHANGED TO GREEN BUTTONWOOD DUE TO ROOT ISSUES IN
 CONFINED AREAS.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF
 WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A
 SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  
  
  
 PROJECT: NORTHWOOD ANCHOR SITE ROW ABANDONMENT
 Z21100023
 NO COMMENTS AT THIS TIME.
  
  
 PROJECT: NORTHWOOD ANCHOR SITE VARIANCES Z21080018
 NO COMMENTS AT THIS TIME.
  
  

Review Stop L LANDSCAPING
Rev No 1 Status F Date 11-17-2021 Cont ID  
Sent By rcaranci Date 11-17-2021 Time 16:52 Rev Time 0.00
Received By rcaranci Date 11-17-2021 Time 16:52 Sent To  
Notes
2021-11-17 16:52:54FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: NORTHWOOD ANCHOR SITE DSI Z21080015
 NOVEMBER 17, 2021
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 1. SECTION 94-448 (D)(3) REQUIRES NATIVE TREES AND
 PALMS IN GOOD CONDITION TO BE PRESERVED ON SITE OR
 RELOCATED. ANSI A 300 (PART 5) STANDARDS SPECIFY
 EXAMPLES OF SUITABILITY RATINGS OF GOOD, MODERATE, OR
 POOR FOR RELOCATION. PROVIDE AN ARBORISTS REPORT RATING
 THE CONDITION AND RELOCATION POTENTIAL FOR THE NATIVE
 TREES AND PALMS. THERE ARE LIVE OAKS, SABAL PALMS, AND
 ROYAL PALMS THAT ARE INDICATED TO BE REMOVED. NON
 NATIVE TREES AND PALMS ARE NOT REQUIRED TO BE
 RELOCATED.
 2. MAKE THE FOLLOWING CORRECTIONS TO THE TREE
 DISPOSITION LIST:
 ? THERE ARE MULTIPLE TREES AND PALMS THAT ARE
 MISIDENTIFIED ON THE TREE DISPOSITION LIST.
 ? ONLY TREES PROPOSED TO BE REMOVED WITH A CANOPY
 DIAMETER OF 20 FEET OR MORE SHOULD HAVE THE MITIGATION
 SQUARE FOOTAGE CALCULATED BASED ON THE ACTUAL DIAMETER.
 TREES LESS THAN 20 FEET CANOPY DIAMETER AND PALMS
 SHOULD SHOW THE CATEGORY MITIGATION DUE.
 ? MULTIPLE PALMS PLANTED TOGETHER MUST HAVE EACH SINGLE
 TRUNK COUNTED TOWARD MITIGATION. EXAMPLE: TRIPLE
 ADONIDIA WOULD BE 3 X 50 SQ FT.
 ? PROVIDE THE TOTAL MITIGATION SQUARE FOOTAGE DUE.
 ? PROVIDE THE MITIGATION SQUARE FOOTAGE PROVIDED BASED
 ON THE PLANT LIST.
  
 3. PROVIDE A DIAGRAM OF THE REQUIRED AND PROVIDED
 PUBLIC, SEMI-PUBLIC, PRIVATE OPEN AREAS AND URBAN
 GREENWAYS SYSTEM FOR EACH PARCEL IN THE NMUD ZONING
 DISTRICT. IDENTIFY THE TYPE OF OPEN SPACE. 10% COMMON
 PRIVATE OPEN SPACE IS REQUIRED.
 THE REQUIRED OPEN SPACE NEEDS TO BE QUANTIFIED,
 IDENTIFIED AS TO THE TYPE, AND ALL REQUIREMENTS NEED TO
 BE SHOWN FOR THAT OPEN SPACE TYPE.
 SURFACE PARKING AREAS CANNOT BE COUNTED TOWARD REQUIRED
 OPEN SPACE.
  
 4. SHOW THE ROOFTOP TERRACES AND INCLUDE HOW THE
 REQUIREMENTS OF SECTION 94-210 P. 5. ARE MET, INCLUDING
 15% LANDSCAPE REQUIREMENT AND PROVIDE A LANDSCAPE PLAN
 FOR EACH AREA.
  
 5. IDENTIFY RELOCATED TREES OR PALMS ON THE PLANT LIST
 AND COUNT THEM TOWARD THE REQUIRED TREES.
  
 6. IF ANY ARTIFICIAL TURF AREAS ARE PROPOSED, THEY MUST
 MEET THE REQUIREMENTS OF SECTION 94-451, INCLUDING ALL
 AREAS THAT ARE ALLOWED BY CODE MUST NOT BE VISIBLE FROM
 A ROAD OR STREET.
  
  
  
 7. BUFFER TREES AND HEDGES MUST BE PROVIDED ALONG ALL
 BUFFERS. THERE IS A LARGE GAP IN THE TREES ADJACENT TO
 THE WEST OF THE SURFACE PARKING LOT. THE WEST PROPERTY
 LINE ADJACENT TO THE FEC RAILROAD RIGHT OF WAY REQUIRES
 AT LEAST A 5 FOOT BUFFER STRIP PER SECTION 94-209 2. F.
 1. E.
  
 8. PROVIDE CALCULATIONS FOR REQUIRED STREET TREES AT
 MAXIMUM SPACING EVERY 30 FEET OR PORTION THEREOF AND
 SHOW THE NUMBER PROVIDED FOR EACH STREETSCAPE LENGTH.
 SHOW THE REQUIRED PLANTING STRIP.
  
 9. CORRECT THE CODE REQUIREMENTS CHART ON SHEET L1.01TO
 UPDATE THE SHADE AND FLOWERING TREE REQUIREMENTS OF
 SECTION 94-442 C. 2. B. TO CURRENT CODE.
  
  
 10. CORRECT THE CODE REQUIREMENTS CHART ON SHEET
 L1.01TO UPDATE THE SHADE AND FLOWERING TREE
 REQUIREMENTS OF SECTION 94-443 C. 3. TO CURRENT CODE.
 THE TREE PER 100 SQ FT REQUIREMENT WAS REMOVED.
  
 11. AUSTRALIAN TREE FERN DOES NOT MEET THE DEFINITION
 OF TREE.
  
 12. SHOW ALL EXISTING AND PROPOSED WATER AND SEWER AND
 DRAINAGE LINES ON THE LANDSCAPE PLAN. SHOW LOCATIONS OF
 BACKFLOWS AND ADJUST LOCATIONS OF UTILITY LINES TO
 RESOLVE CONFLICTS WITH EXISTING AND PROPOSED TREES AND
 LANDSCAPING.
  
 13. PLANT LIST NEEDS TO BE MODIFIED TO SEPARATE THE
 REQUIRED OPEN SPACE PLANT LISTS.
  
  
 14. PROVIDE THE 50 REQUIRED FLORIDA FRIENDLY POINTS
 BASED ON THE FINAL PLANT LIST PER SECTION 94-443(G).
 AFTER MAKING THE FOLLOWING CORRECTIONS:
 ? 2 INDICATE WHERE THE AREAS ARE DESIGNATED.
 ? 3A AND 3C ARE NOT SUPPORTED BY THE PLANT LIST.
 ? 5B AND 5D ADD UP TO MORE THAN 100%, MUST REDUCE ONE
 CATEGORY
 ? 6B IS NOT SUPPORTED BY THE PLAN SUBMITTED
  
  
 15. SHOW COMPLIANCE WITH SECTION 94-445 L. PLANT
 SPECIES. A MINIMUM OF 60 PERCENT OF PLANT MATERIAL
 ADDED SHALL BE FLORIDA NATIVE OR DROUGHT TOLERANT
 SPECIES SELECTED FROM THE CITY LIST OR THE LIST OF
 SPECIES IN THE MOST RECENT EDITION OF SOUTH FLORIDA
 WATER MANAGEMENT DISTRICT WATERWISE SOUTH FLORIDA
 LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED ON THE
 PLANT LIST.
  
  
 16. ALL SURFACE PARKING MUST MEET THE REQUIREMENTS OF
 SECTION 94-443(C)(3) A. INCLUDING TERMINAL LANDSCAPE
 ISLANDS, INTERIOR ISLANDS AND SHADE TREES.
 17. PROVIDE AN EXHIBIT SHOWING THE PARKING AREA SURFACE
 CALCULATIONS, PARKING SPACE AREAS AND LANDSCAPE AREAS
 PROVIDED TO DEMONSTRATE COMPLIANCE WITH SECTIONS 94-443
 (C)(3) AND (4). PROVIDE THE CALCULATIONS IN THE
 LANDSCAPE REQUIREMENT CHART. REFER TO FIGURE XIV-1.
 SHOW THE ACTUAL PROVIDED LANDSCAPE SQUARE FOOTAGE.
  
 18. PROVIDE SCREENING HEDGES AND SHOW LOCATIONS FOR ALL
 GROUND MOUNTED VALVES AND EQUIPMENT AND ADD A NOTE THAT
 ALL EQUIPMENT WILL BE SCREENED.
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF
 WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A
 SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  
  
  
 PROJECT: NORTHWOOD ANCHOR SITE ROW ABANDONMENT
 Z21100023
 NO COMMENTS AT THIS TIME.
  
  
 PROJECT: NORTHWOOD ANCHOR SITE VARIANCES Z21080018
 NO COMMENTS AT THIS TIME.
  
  

Review Stop PU PUBLIC UTILITIES
Rev No 4 Status P Date 10-13-2022 Cont ID  
Sent By mtechnow Date 10-13-2022 Time 16:11 Rev Time 0.00
Received By mtechnow Date 10-13-2022 Time 16:11 Sent To  
Notes
***NONE***

Review Stop PU PUBLIC UTILITIES
Rev No 3 Status F Date 08-31-2022 Cont ID  
Sent By mtechnow Date 08-31-2022 Time 15:39 Rev Time 0.00
Received By mtechnow Date 10-13-2022 Time 16:10 Sent To  
Notes
2022-08-31 15:39:00 
 -ON 24TH ST. EXTEND THE PROPOSED SANITARY SYSTEM TO THE
 WITHIN THE LIMITS OF THE PROPOSED DEVELOPMENT (THE
 SPRUCE AKA THE PROPER).
 -EXTEND THE FORCE MAIN ON BROADWAY TO THE CONNECTION
 POINT ON 26TH ST. AND TO UPSIZE THE PROPOSED FROM 14?
 TO 20?. THE CITY EXPECTS TO CONTRIBUTE TOWARDS THIS
 WORK.
 -EXTEND THE SANITARY SEWER ON 23RD STREET WESTWARD 100
 LINEAR FEET TOWARD PINEWOOD AVE.
 -IN THE ALLEY NORTH OF NORTHWOOD RD., REMOVE THE
 SANITARY SEWER FROM UNDER BUILDING OVERHANG AND INSTALL
 A TERMINAL MANHOLE.
 -DRAINAGE SYSTEMS ON 23RD STREET BETWEEN BROADWAY AVE
 AND PINEWOOD AVE AND ON BROADWAY AVE SOUTH OF NORTHWOOD
 ROAD ARE TO BE MAINTAINED BY THE DEVELOPER.
  
 CONTACT MIKE TECHNOW [email protected] WITH ANY
 QUESTIONS

Review Stop PU PUBLIC UTILITIES
Rev No 2 Status F Date 06-27-2022 Cont ID  
Sent By mtechnow Date 06-27-2022 Time 14:07 Rev Time 0.00
Received By mtechnow Date 06-27-2022 Time 14:05 Sent To  
Notes
2022-06-27 14:06:54-SHOW PINEWOOD ROW AS PRIVATE AND THE PROPOSED GRAVITY
 SEWER POINT OF CONNECTION ON 24TH ST.
 -CALL FOR THE GRAVITY MAIN ON 23RD ST TO BE
 BACK-PITCHED AND REVERSE FLOW DIRECTION INTO THE
 EXISTING SYSTEM.
 -THERE IS NO NEED TO EXTEND THE GRAVITY MAIN ON
 BROADWAY/CANNOT CONNECT INTO ALLEY OFF BROADWAY.
 -REMOVE BACKFLOWS FROM THE ROW.
 -NO 3? SERVICES. UPSIZE OR DOWNSIZE.
 -THE EXISTING FPL DUCT BANK NEEDS TO BE RELOCATED TO
 PROVIDE SPACING FOR PROPOSED UTILITIES WITHIN THE ROAD
 ROW. PROPOSED UTILITIES SHOULD NOT BE RUNNING UNDER THE
 CURB.
 -THE CITY IS EVALUATING REQUIRED UPSIZING FOR PROPOSED
 UTILITIES AND WILL NEED TO LOOK AT FLOWS FOR PIPE
 SIZING/LIFT STATION.
 -SHOW ALL EXISTING UTILITIES.
  
  
 CONTACT MIKE TECHNOW [email protected] 561-494-1047

Review Stop PU PUBLIC UTILITIES
Rev No 1 Status F Date 04-13-2022 Cont ID  
Sent By mtechnow Date 04-13-2022 Time 15:15 Rev Time 0.00
Received By mtechnow Date 04-13-2022 Time 15:15 Sent To  
Notes
2022-04-13 15:15:38-CORRECT PIPE DIMENSIONS ON PINEWOOD. THERE IS AN
 EXISTING 8? WM.
 -UPSIZE THE 6? WM ON 25TH ST. (SMALL STRETCH OF PIPE)
 -THE EXISTING BUSINESSES ON 23RD ST ARE SENDING FLOW TO
 THE SANITARY SYSTEM. THE ONLY WAY THE SANITARY SYSTEM
 CAN BE PRIVATE IS IF FLOW FROM THESE PROPERTIES IS
 DIVERTED.
 -WILL NEED TO UPSIZE THE SANITARY SYSTEM DOWNSTREAM DUE
 TO ADDITIONAL IMPACTS ON THE SYSTEM. THE EXISTING
 SYSTEM HAS THE GRAVITY SEWER BEHIND THE PROPERTIES ON
 25TH, THE PROPOSED IMPROVEMENTS SHOULD BE WITHIN THE
 25TH ST ROW.
 -WILL NEED TO SEE ALL THE EXISTING DRY UTILITIES TO
 FINALIZE THE PROPOSED CITY OWNED UTILITIES.
 -SHOW THE EXISTING 14? CAS FM ON PINEWOOD AND PROVIDE A
 PLAN TO ALLOW ACCESS FOR O&M OR PROPOSE THE MAIN BE
 RELOCATED. IT CANNOT HAVE A BUILDING ON TOP OF IT.
 -IS THE WATER MAIN PRIVATE AND ARE YOU PROPOSING A
 MASTER METER?
  

Review Stop PU-CS PUBLIC UTILITIES CUSTOMER SRVC
Rev No 4 Status P Date 09-26-2022 Cont ID  
Sent By mhurley Date 09-26-2022 Time 08:51 Rev Time 0.00
Received By mhurley Date   Time   Sent To  
Notes
***NONE***

Review Stop PU-CS PUBLIC UTILITIES CUSTOMER SRVC
Rev No 3 Status F Date 07-29-2022 Cont ID  
Sent By mhurley Date 07-29-2022 Time 08:26 Rev Time 0.00
Received By mhurley Date   Time   Sent To  
Notes
2022-07-29 08:26:38PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING:
  
 -SEE IF CAN ADJUST NORTHWEST PROPOSED SEWER LATERAL
 SLIGHTLY TO THE EAST TO ELIMINATE EXTRA ROOT BARRIER AT
 TREE TRUNK.
 -AT BOTTOM OF L1.00 THERE IS A LEADER LINE WITH NO
 LABEL. ADD LABEL AND VERIFY OBJECT DOES NOT CONFLICT
 WITH PROPOSED METERED WATER SERVICE THERE.
 -IN PRIOR REVISIONS OF CIVIL PLANS THERE WAS A SEPARATE
 8 INCH FIRELINE WITH DCDA FOR THE NORTHWEST BUILDING,
 BUT CURRENT REVISION DOES NOT SHOW IT ANYMORE. PLEASE
 PROVIDE MORE INFORMATION ON WHY IT IS NOT THERE
 ANYMORE.
 -METERS 2 INCHES AND SMALLER ARE INSTALLED UNDERGROUND
 IN A METER BOX. CAN UPDATE CIVIL PLANS AT ENGINEERING
 DEVELOPMENT SUBMITTAL.
 -AT ENGINEERING DEVELOPMENT SUBMITTAL: PROVIDE PROFILES
 FOR FIRELINES; UPDATE VALVE AND REDUCER ON C3.04 SO NOT
 IN CROSSWALK AND PROPERLY LABELED.
 -LANDSCAPE PLAN SHOWS PLANTS OVER NORTHEAST FPL VAULT.
 -L2.00 SHOWS AT LEAST A COUPLE PROPOSED BIKE RACKS ON
 TOP OF FPL VAULTS. RECOMMEND SHOWING FPL VAULTS IN
 BACKGROUND OF L2.00.
  
 RESPECTFULLY,
 MARK HURLEY
 [email protected]

Review Stop PU-CS PUBLIC UTILITIES CUSTOMER SRVC
Rev No 2 Status F Date 07-27-2022 Cont ID  
Sent By mhurley Date 07-27-2022 Time 07:40 Rev Time 0.00
Received By mhurley Date   Time   Sent To  
Notes
2022-07-27 07:39:00CIVIL PLANS DID NOT APPEAR TO BE UPDATED REVISION.
 PLEASE SUBMIT MOST UPDATED REVISION OF CIVIL PLANS WITH
 ANY CHANGES THAT WERE NOTED IN RESPONSE LETTER, SO CAN
 PROPERLY REVIEW.

Review Stop PU-CS PUBLIC UTILITIES CUSTOMER SRVC
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PW PUBLIC WORKS
Rev No 5 Status F Date 10-05-2022 Cont ID  
Sent By   Date 10-05-2022 Time   Rev Time 0.00
Received By   Date 10-05-2022 Time   Sent To  
Notes
2022-10-05 15:44:461- PLEASE PROVIDE CONTAINER SIZE/TYPE FOR THE SOLID
 WASTE.
 2- PLEASE PROVIDE HEIGHT CLEARANCE OVER AT THE LOADING
 ZONE, WHERE THE SOLID WASTE CONTAINER(S) GET SERVICED
 AND THE BULK WASTE GET PICKED UP.
  
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045

Review Stop PW PUBLIC WORKS
Rev No 4 Status F Date 07-29-2022 Cont ID  
Sent By   Date 07-29-2022 Time   Rev Time 0.00
Received By   Date 07-29-2022 Time   Sent To  
Notes
2022-07-29 10:03:211- PLEASE PROVIDE CONTAINER SIZE/TYPE FOR THE SOLID
 WASTE.
 2- PLEASE PROVIDE HEIGHT CLEARANCE OVER AT THE LOADING
 ZONE, WHERE THE SOLID WASTE CONTAINER(S) GET SERVICED
 AND THE BULK WASTE GET PICKED UP.
 3- IN CASE OF PROPOSING ADDITION OF ANY NEW CAN(S) IN
 THE CITY`S RIGHT-OF-WAY , THE LOCATION AND QUANTITY OF
 THE CAN(S) SHALL BE REVIEWED AND APPROVED BY PUBLIC
 WORKS DEPARTMENT AND THE CAN(S) SHALL BE TYPE, SIZE AND
 COLOR APPROVED BY PUBLIC WORKS DEPARTMENT. THE BUILDING
 MAINTENANCE IS RESPONSIBLE TO MAINTAIN AND SERVICE THE
 CAN(S).
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045

Review Stop PW PUBLIC WORKS
Rev No 3 Status F Date 06-29-2022 Cont ID  
Sent By   Date 06-29-2022 Time   Rev Time 0.00
Received By   Date 06-29-2022 Time   Sent To  
Notes
2022-06-29 13:56:13 
 1- PLEASE PROVIDE CONTAINER SIZE/TYPE FOR THE SOLID
 WASTE
 2- PLEASE PROVIDE HEIGHT CLEARANCE OVER AT THE LOADING
 ZONE, WHERE THE SOLID WASTE CONTAINER(S) GET SERVICED
 AND THE BULK WASTE GET PICKED UP.
 3- IN CASE OF PROPOSING ADDITION OF ANY NEW CAN(S) IN
 THE CITY`S RIGHT-OF-WAY , THE LOCATION AND QUANTITY OF
 THE CAN(S) SHALL BE REVIEWED AND APPROVED BY PUBLIC
 WORKS DEPARTMENT AND THE CAN(S) SHALL BE TYPE, SIZE AND
 COLOR APPROVED BY PUBLIC WORKS DEPARTMENT. THE BUILDING
 MAINTENANCE IS RESPONSIBLE TO MAINTAIN AND SERVICE THE
 CAN(S).
 4- ALL THE PARKING STALL PAINTING SHALL COMPLY WITH THE
 CITY`S MUNICIPAL CODE SECTION 94-485 AND FLORIDA
 STATUES [553.5041 F.S.].
 5- ALL STRIPING AND SIGNAGE SHALL MEET THE M.U.T.C.D.
 LATEST EDITION.
 6- ALL PAVEMENT MARKING AND SIGNING DAMAGED DURING
 CONSTRUCTION SHALL BE RESTORED.
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045

Review Stop PW PUBLIC WORKS
Rev No 2 Status F Date 04-14-2022 Cont ID  
Sent By   Date 04-14-2022 Time   Rev Time 0.00
Received By   Date 04-14-2022 Time   Sent To  
Notes
2022-04-14 11:16:49 
 PLEASE PROVIDE THE FOLLOWINGS:
 1- DUMPSTER ENCLOSURE DETAIL. DETAILS FOR SANITATION
 SERVICE (I.E. SOLID WASTE CONTAINER(S) TYPE, COLLECTION
 LOCATION, ETC.). FOR A FREESTANDING SITE DUMPSTER
 ENCLOSURE, THE ENCLOSURE SHALL COMPLY WITH THE LATEST
 REVISION OF CITY OF WEST PALM BEACH GENERAL
 CONSTRUCTION-GARBAGE ENCLOSURE STANDARD, GC-7. (LINK TO
 THE LATEST REVISION OF THE GC-7 DOCUMENT: HTTPS://WWW.W
 PB.ORG/HOME/SHOWPUBLISHEDDOCUMENT/3690/6376290604221000
 00)
 2- OWNERS AND/OR OCCUPANTS OF PROPERTY THAT REQUIRE
 GREASE HAULING SERVICES SHALL ENSURE THAT THEIR GREASE
 TANKS OR CONTAINERS REMAIN CLEAN, AND ARE ENCLOSED AND
 NOT IN PUBLIC VIEW.
  
 3- IN CASE OF PROPOSING ADDITION OF ANY NEW CAN(S) IN
 THE CITY`S RIGHT-OF-WAY , THE LOCATION AND QUANTITY OF
 THE CAN(S) SHALL BE REVIEWED AND APPROVED BY PUBLIC
 WORKS DEPARTMENT AND THE CAN(S) SHALL BE TYPE, SIZE AND
 COLOR APPROVED BY PUBLIC WORKS DEPARTMENT. THE BUILDING
 MAINTENANCE IS RESPONSIBLE TO MAINTAIN AND SERVICE THE
 CAN(S).
  
 4- PLEASE ALSO RELOCATE THE LOCATION/ORIENTATION OF THE
 ENCLOSURES TO ALLOW OUR SANITATION FRONT LOAD
 COLLECTION VEHICLE SAFELY ACCESS AND SERVICE THE
 CONTAINER(S) WHILE MINIMIZING/AVOIDING ANY BACK UP
 MOVEMENTS AND SHORT RADIUS TURNS.
  
 5- BULK ITEMS WILL BE COLLECTED BY A CLAM TRUCK, FOR
 WHICH THE ENCLOSURE SHOULD NOT HAVE A STOP BAR AND
 GATES SHOULD BE COMPLETELY OPEN TO MITIGATE ANY CHANCES
 OF DAMAGE WHILE BEING SERVICED.
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045

Review Stop PW PUBLIC WORKS
Rev No 1 Status F Date 11-18-2021 Cont ID  
Sent By   Date 11-18-2021 Time   Rev Time  
Received By   Date 11-18-2021 Time   Sent To  
Notes
2021-11-18 06:58:52 
 PLEASE PROVIDE THE FOLLOWINGS:
 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID
 WASTE VOLUME PRODUCED ALONG WITH THE SIZE, TYPE AND
 QUANTITY OF THE CONTAINER (I.E. DUMPSTER/COMPACTOR)
 THAT WILL BE UTILIZED THAT WILL BE UTILIZED FOR THE
 SANITATION SERVICE.
 2- DETAILS FOR SANITATION SERVICE (I.E. SOLID WASTE
 CONTAINER(S) TYPE, COLLECTION LOCATION, ETC.).
 3- AUTOTURN EXHIBIT (DYNAMIC ENVELOPE AND THE VEHICLE?S
 WHEEL PATH) FOR THE SANITATION SERVICE, FRONT LOADER
 TRUCK WITH THE FOLLOWING SPECS:
 - DUAL AXLES
 - TRUCK LENGTH: 35 FT
 - TRUCK WIDTH: 11 FT
 - TURNING RADIUS:
 - SAE TURNING RADIUS: 32.5 FT
 - CURB-TO-CURB DIAMETER: 74 FT
 - WALL-TO-WALL DIAMETER: 86.3 FT
 4- DESIGNATED LOCATION FOR THE BULK ITEM PICK UP AND
 RECYCLING CONTAINERS
  
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045
  

Review Stop STORM STORMWATER
Rev No 4 Status P Date 10-11-2022 Cont ID  
Sent By tward Date 10-04-2022 Time 10:46 Rev Time 0.00
Received By tward Date 10-11-2022 Time 09:06 Sent To  
Notes
2022-10-04 10:55:49STORM #4 WAS GIVEN A PASS WITH SITE PLAN CONDITIONS
 LISTED AT THE BOTTOM OF THESE NOTES.
  
 THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 9/22/22 SUBMITTAL. PREVIOUSLY SATISFIED COMMENTS ARE
 NOT INCLUDED.
  
 1. [PARTIALLY SATISFIED] LABEL ALL THE STREETS ON ALL
 OF THE SHEETS. FOR EXAMPLE, SHEET C1.01 ONLY LABELS
 PINEWOOD AVE. NONE OF THE EAST-WEST STREETS ARE
 LABELED. NEW COMMENT - ON SHEET C3.01 LABEL PINEWOOD
 AVE NORTH AND SOUTH OF 25TH ST.
  
 13. [SATISFIED] REVISE THE PARKING SPACE STRIPING
 DETAIL TO MATCH CITY CODE.
  
 16. [SATISFIED ??? SEE NEW COMMENTS ON THE 9/22/2022
 SUBMITTAL] RCP PIPE (MINIMUM 15 INCHES IN DIAMETER) TO
 BE INSTALLED WITHIN THE RIGHT OF WAY. NEW COMMENT: NOT
 ALL PIPES ARE LABELED. PROPOSED STORM PIPES ON 25TH ST
 AT BROADWAY, ON BROADWAY AVE AT 24TH ST., BROADWAY AT
 NORTHWOOD RD LABELED AS 18" HDPE.
  
 NEW COMMENTS (5/27/2022 SUBMITTAL):
  
 17. [SATISFIED] INDICATE HOW THE EXISTING CATCH BASIN
 ON THE SOUTH SIDE OF 23RD ST EAST OF PINEWOOD DRIVE
 WILL CONNECT TO THE MS4.
  
 18. [NOT SATISFIED ??? TO BE PROVIDED AND REVIEWED WITH
 ENGINEERING PERMIT SUBMITTAL] PROVIDE PRE- AND
 POST-DEVELOPMENT HGL CALCULATIONS FOR THE DRAINAGE
 SYSTEM ON BROADWAY AND 23RD STREET WITH THE ENGINEERING
 PERMIT SUBMITTAL.
  
 19. [NOT SATISFIED] REVIEW DESIGN PLANS IN SFWMD
 PERMITS FOR 24TH ST AND 25TH ST AND OTHER PROJECTS IN
 THE VICINITY FOR STORM PIPE CONNECTIVITY. THE INLET ON
 THE SOUTH SIDE OF 24TH ST EAST OF BROADWAY MAY BE
 CONNECTED TO A MANHOLE SOUTH OF THE STRUCTURE INSTEAD
 OF THE MANHOLE ON BROADWAY AVE. ADDITIONAL COMMENTS:
 THE AS-BUILT PICTURE PROVIDED IN THE 7/15/22 RESPONSE
 LETTER SHOWS THE DRAINAGE SYSTEM BEFORE CORNER BULBOUTS
 WERE CONSTRUCTED ON 24TH STREET ABOUT 12 YEARS AGO. THE
 AFOREMENTIONED MH IS VISIBLE IN THE APRIL 2011 AND
 APRIL 2015 GOOGLE MAP STREETVIEWS.
  
 20. [TO BE SATISFIED AT ENGINEERING PERMIT SUBMITTAL]
 ADDITIONAL GRADES WILL BE NEEDED FOR THE ENGINEERING
 PERMIT SUBMITTAL. NOTE PROPOSED SPOT GRADES WERE
 REMOVED ON THE 9/22/22 SET.
  
 21. [NOT SATISFIED ??? PROPOSED SPOT GRADES WERE
 REMOVED FROM THE PGD PLANS BUT THE CROSS SECTIONS
 APPEAR TO SHOW SIDEWALK AND PARKING SPACE CROSS SLOPES
 OF 4% OR STEEPER, WHICH EXCEEDS THE 2% MAX SHOWN ON THE
 CROSS SECTIONS.] THE FINISHED FLOOR ELEVATIONS AND SPOT
 GRADES ON THE PGD PLANS PROVIDED WHERE THE CROSS
 SECTION SYMBOLS ARE WILL RESULT IN CROSS SLOPES STEEPER
 THAN THE MAX. 2% SHOWN ON THE CROSS SECTIONS FOR THE
 PARKING AREA AND ALLOWED FOR THE SIDEWALK AREA.
  
 22. [PARTIALLY SATISFIED] WILL THERE BE PEDESTRIAN
 ACCESS TO THE SOUTH SIDE OF 23RD STREET AT THE PINEWOOD
 AND BROADWAY INTERSECTIONS? SHOW CROSS WALKS AND CURB
 RAMPS. ADDITIONAL COMMENTS - SHOW CURB RAMP AND
 PEDESTRIAN CROSSWALK SIGN ON THE SOUTH SIDE OF 23RD ST
 EAST OF PINEWOOD AVE SHOW NEW CURB RAMP ON SOUTH SIDE
 OF 23RD STREET AT THE BROADWAY AVE. CROSSWALK. MAKE
 SURE THE CRUB RAMP DOES NOT FALL WITHIN THE EXISTING
 DRIVEWAY APRON OR FLARES.
  
 23. [SATISFIED ??? WILL BE CONFIRMED WITH THE
 ENGINEERING PERMIT SUBMITTAL] ALL CURB RAMPS WILL NEED
 TO BE BROUGHT UP TO CURRENT ADA STANDARDS IF THE
 PAVEMENT ADJACENT TO THE CURB RAMP IS DISTURBED OR
 OVERLAID.
  
 24. [SATISFIED] ADA MATS MAY BE NEEDED WHERE THE
 SIDEWALKS MEET DRIVEWAYS FOR THE GARAGES OR ALLEYS.
  
 25. SHEET C3.05:
 A. [SATISFIED] BUILDING A (NORTHWEST) SERVICE -
 1. CONFIRM PROPOSED 3" WATER SERVICE WILL CROSS AN 8"
 PVC SANITARY SEWER MAIN.
 2. CONFIRM TAP IS TO A 24" WM.
  
 B. [SATISFIED ??? NOTE SHEET C2.02 CALLS OUT STORM PIPE
 AS HDPE] BUILDING A (NORTHEAST) SERVICE - SHOW THE
 EXFILTRATION TRENCH.
  
 C. [SATISFIED] BUILDING A (SOUTHWEST) SERVICE - CONFIRM
 THE WATER SERVICE WILL CROSS 15" RCP STORM AND 8" PVC
 SEWER.
  
 D. [PARTIALLY SATISFIED ??? SHOW 14??? FM. CONFIRM 8???
 SSWR] BUILDING B SERVICE - SHOW PROPOSED STORM PIPE
 BETWEEN EXISTING INLETS.
  
 E. [NOT SATISFIED ??? SHEET C2.02 LABELS PIPE AS 18
 INCH HDPE] BUILDING A (SOUTHEAST) SERVICE -
 2. CONFIRM RCP STORM VS. HDPE STORM.
  
 26. [SATISFIED] SHOW BREAKS IN THE EXFILTRATION TRENCH
 IF WATER OR SEWER SERVICE LINES WILL CROSS IN THE
 ENVELOPE OF THE EXFILTRATION TRENCH.
  
 27. [NOT SATISFIED ??? WILL PROVIDE WITH THE
 ENGINEERING PERMIT SUBMITTAL] PROVIDE DETAILS OF THE
 CONTROL STRUCTURES WITH THE ENGINEERING PERMIT
 SUBMITTAL.
  
 28. [SATISFIED] SECTION B-B - LEFT SIDE OF SECTION IS
 LABELED AS 18.4 FEET LANDSCAPING. WILL THERE BE A
 CONTINUOUS SIDEWALK ON THE WEST SIDE OF THE STREET?
  
 29. [SATISFIED] SECTION E-E - CONFIRM 2.5 FEET
 DIMENSION FOR THE TYPE 'F' CURB. SUM OF DIMENSIONS
 ACROSS RIGHT OF WAY IS LESS THAN 75 FEET.
  
 30. [SATISFIED] SECTION H-H - CONFIRM 2.5 FEET
 DIMENSION FOR THE TYPE 'F' CURB. SUM OF DIMENSIONS
 ACROSS RIGHT OF WAY IS MORE THAN 55 FEET.
  
 NEW COMMENTS (9/22/2022 SUBMITTAL)
  
 31. MOVE THE CONSTRUCTION ENTRANCE OUT OF THE 25TH ST.
 R/W ON THE EROSION CONTROL PLAN.
  
 32. CALLOUT AND NUMBER THE NEW DRAINAGE STRUCTURE ON
 THE SW CORNER OF 25TH ST AND PINEWOOD AVE AND THE PIPE
 CONNECTION TO STRUCTURE EX-1.
  
 33. NUMBER THE MANHOLE STORM STRUCTURE LOCATED BETWEEN
 ST-15 AND ST-14 AND NUMBER THE EXISTING DRAINAGE
 STRUCTURE EAST OF THIS MANHOLE AND LABEL THE STORM PIPE
 BETWEEN THESE UNNUMBERED STRUCTURES ON THE WEST SIDE OF
 BROADWAY AVE NORTH OF 24TH ST.
  
 34. NUMBER THE PROPOSED DRAINAGE STRUCTURE TO THE
 SOUTHWEST OF MH EX-3 AND LABEL THE STORM PIPE BETWEEN
 THESE TWO STRUCTURES NEAR THE INTERSECTION OF 24TH ST
 AND BROADWAY AVE.
  
 35. NUMBER THE PROPOSED DRAINAGE STRUCTURE TO THE
 NORTHWEST OF MANHOLE EX-4 AND LABEL THE STORM PIPE
 BETWEEN THESE STRUCTURES IN THE INTERSECTION OF
 NORTHWOOD ROAD AND BROADWAY AVE.
  
 36. NUMBER THE EXISTING MANHOLE TO THE EAST OF MANHOLE
 EX-4 ON NORTHWOOD ROAD.
  
 37. THE PRELIMINARY STORMWATER MANAGEMENT CALCULATIONS
 WERE REVIEWED TO SEE THE ASSUME WIDTH OF 5 FEET FOR THE
 PROPOSED EXFILTRATION TRENCH. THE EXFILTRATION TRENCHES
 ALONG BROADWAY AVE BETWEEN ST-34 AND ST-35 AND BETWEEN
 ST-36 AND ST-37 ONLY MEASURE 3 FEET IN WIDTH.
  
 38. STRUCTURE EX-3 ON BROADWAY AT 24TH ST MAY NEED TO
 BE REPLACED WITH A LARGER STRUCTURE IN ORDER TO CONNECT
 NEW STORM PIPES TO THE STRUCTURE.
  
 39. STORM PIPE SOUTH OF STRUCTURE ST-14 LABELED (TWICE)
 AS 14 LF 18??? HDPE 1 LF EXFILTRATION TRENCH. THIS
 COMMENT CAN BE ADDRESSED WITH THE ENGINEERING PERMIT
 SUBMITTAL.
  
 40. ON THE PGD PLANS, SHOW EXISTING DRIVEWAY FOR 940
 NORTHWOOD ROAD AND THE DRIVEWAYS ON THE SOUTH SIDE OF
 23RD STREET SO THAT THE PROPOSED BULBOUT FOR THE
 ONE-WAY PORTION OF THE STREET WILL NOT CONFLICT WITH
 THE DRIVEWAYS.
  
 41. PROVIDE A DETAIL FOR A VALLEY GUTTER INLET AND HOW
 THE DROP CURB WILL TRANSITION TO THE VALLEY GUTTER TOP.
  
 *******************************************************
 *****************************
 *******************************************************
 *****************************
 CONDITIONS FOR SITE PLAN APPROVAL (THESE CAN BE
 ADDRESSED WITH THE ENGINEERING PERMIT SUBMITTAL):
  
 - LABEL ALL THE STREETS ON ALL OF THE PLANS (COMMENT
 #1)
  
 - PROVIDE PRE- AND POST-DEVELOPMENT HGL CALCULATIONS
 FOR THE DRAINAGE SYSTEM FROM BROADWAY AVE/26TH ST OR
 BROADWAY AVE/25TH ST TO PINEWOOD AVE/23RD ST. (COMMENT
 #18)
  
 - REVISE STORM PIPE CONNECTION BETWEEN THE INLET ON THE
 SOUTH SIDE OF 24TH ST EAST OF BROADWAY AVE TO THE
 MANHOLE IN THE INTERSECTION OF BROADWAY AVE AND 24TH
 ST. (COMMENT #19)
  
 - PROVIDE PROPOSED SPOT GRADES ON THE PGD PLANS.
 SIDEWALK AND PARKING SPACE CROSS SLOPES ARE NOT TO
 EXCEED 2%. (COMMENTS #20 AND #21)
  
 - SHOW EXISTING DRIVEWAYS ON THE SOUTH SIDE OF 23RD
 STREET. SHOW CURB RAMPS THAT DO NOT INTERFERE WITH THE
 DRIVEWAY APRONS OR DRIVEWAY FLARES. SHOW THAT THE
 PROPOSED BULBOUT EAST OF THE BROADWAY AVE EXTENSION
 WILL NOT CONFLICT WITH THE DRIVEWAYS.(COMMENTS #22 AND
 #40)
  
 - ALL CURB RAMPS WHERE THE ADJACENT PAVEMENT IS
 DISTURBED OR OVERLAID WILL NEED TO BE BROUGHT UP TO
 CURRENT ADA STANDARDS. (COMMENT #23)
  
 - UTILITY PROFILES (SHEET C3.05) TO SHOW AND LABEL ALL
 EXISTING (THAT WILL REMAIN) AND PROPOSED UTILITIES THAT
 THE WATER SERVICES WILL BE CROSSING. COORDINATE PIPE
 CALLOUTS WITH THE PGD AND UTILITY PLANS. (COMMENT #25)
  
 - PROVIDE DETAILS OF THE STORMWATER CONTROL STRUCTURES.
 (COMMENT #27)
  
 - MOVE THE CONSTRUCTION ENTRANCE OUT OF THE R/W.
 (COMMENTS #31)
  
 - CALLOUT AND NUMBER ALL OF THE EXISTING AND PROPOSED
 DRAINAGE STRUCTURES AND STORM PIPES WITHIN THE
 CONSTRUCTION LIMITS. (COMMENTS #32 TO #36)
  
 - LABEL THE WIDTH OF THE EXFILTRATION TRENCHES ON THE
 PDG PLANS (COMMENTS #37 AND #39)
  
 - CONFIRM EXISTING DRAINAGE STRUCTURES DO NOT NEED TO
 BE REPLACED FOR THE PROPOSED MODIFICATIONS TO THE
 STRUCTURES (COMMENT #38)
  
 - PROVIDE A DETAIL FOR A VALLEY GUTTER INLET AND HOW
 THE DROP CURB WILL TRANSITION TO THE VALLEY GUTTER TOP.
 (COMMENT #41)
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  

Review Stop STORM STORMWATER
Rev No 3 Status F Date 07-01-2022 Cont ID  
Sent By tward Date 07-01-2022 Time 14:11 Rev Time 0.00
Received By tward Date 07-01-2022 Time 14:14 Sent To  
Notes
2022-07-01 14:13:24THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 5/27/2022 SUBMITTAL.
  
 1. [PARTIALLY SATISFIED] LABEL ALL THE STREETS ON ALL
 OF THE SHEETS. FOR EXAMPLE, SHEET C1.01 ONLY LABELS
 PINEWOOD AVE. NONE OF THE EAST-WEST STREETS ARE
 LABELED. NEW COMMENT ? ON SHEET C3.01 LABEL PINEWOOD
 AVE NORTH AND SOUTH OF 25TH ST.
  
 2. [SATISFIED] COMPLETE THE PAVING, GRADING AND
 DRAINAGE NOTES ON THE PGD PLAN SHEETS. SOME OF THE
 NOTES DO NOT AGREE WITH THE VERTICAL DATUM LABEL AT THE
 BOTTOM OF THE SHEETS.
  
 3. [SATISFIED - EXFILTRATION TRENCH ON THE EAST SIDE OF
 BROADWAY AVE SHOULD BE SET BACK FROM THE RIGHT OF WAY
 TO ENSURE THE TRENCH DOES NOT ENCROACH INTO THE RIGHT
 OF WAY DURING CONSTRUCTION.] EXFILTRATION TRENCH FOR
 TREATING RUNOFF FROM ONSITE AREAS SHALL NOT BE LOCATED
 WITHIN THE RIGHT OF WAY.
  
 4. [SATISFIED] ON SHEET C2.03 THERE IS A NEW DRAINAGE
 STRUCTURE ON THE EAST SIDE OF PINEWOOD AVE ABOUT 40
 FEET NORTH OF THE CENTERLINE OF NORTHWOOD ROAD. THIS
 INLET IS SHOWN NEXT TO AN EXISTING INLET THAT IS BEING
 CONVERTED TO A VALLEY GUTTER INLET. IS THE NEW INLET
 NEEDED?
  
 5. [SATISFIED] WHAT WILL BE THE MAXIMUM CROSS SLOPE OF
 THE ON-STREET PARKING SPACES?
  
 6. [SATISFIED - REVIEW SECTION F-F] LABEL THE PARKING
 AREAS ON THE CROSS SECTIONS.
  
 7. [SATISFIED] ADVISE IF THE WEST DROP CURB ON PINEWOOD
 AVE WILL BE PARALLEL TO THE WEST RIGHT OF WAY. THE 9.0
 FT DIMENSION ON SECTION B-B DOES NOT APPEAR TO REACH
 THE 2 FEET DROP CURB.
  
 8. [SATISFIED] SIDEWALK CROSS SLOPES SHALL NOT EXCEED 2
 PERCENT.
  
 9. [SATISFIED] THE DIMENSIONS FOR THE PARKING AREAS ON
 SECTION D-D AND SECTION E-E (FOR BROADWAY AVE) APPEAR
 TO INCLUDE THE TYPE 'D' CURB.
  
 10. [SATISFIED] EXTEND SECTION F-F TO THE PARKING LOT
 ON THE WEST SIDE OF PINEWOOD AVE. DIMENSION THE
 SIDEWALKS, CURB AND GUTTER, TRAVEL LANES AND PARKING
 AREA.
  
 11. [SATISFIED] DIMENSION MINIMUM BUILDING SETBACKS ON
 THE CROSS SECTIONS.
  
 12. [SATISFIED - SHOW CROSS SECTION SYMBOL ON SHEET
 C2.04] PROVIDE CROSS SECTION OF BROADWAY AVE SOUTH OF
 NORTHWOOD ROAD. EXTEND SECTION FROM FACE OF BUILDING TO
 FACE OF BUILDING. DIMENSION SIDEWALKS, CURB AND GUTTER,
 PARKING AREAS, TRAVEL LANES, SETBACKS FROM R/W, ETC.
  
 13. [NOT SATISFIED - INCLUDE PARKING STRIPING DETAIL
 WITH THE ENGINEERING PERMIT SUBMITTAL] REVISE THE
 PARKING SPACE STRIPING DETAIL TO MATCH CITY CODE.
  
 14. [SATISFIED] THE CITY DOES NOT ALLOW THE USE OF
 BLEEDERS WITH EXFILTRATION TRENCHES.
  
 15. [SATISFIED - CAN HATCHING OR BOLD BORDER BE ADDED
 ON SHEET C1.00 SHOWING THE ROWS TO BE ABANDONED?] LABEL
 RIGHT OF WAYS PROPOSED TO BE ABANDONED ON THE PLAN
 SHEETS.
  
 16. [NOT SATISFIED] RCP PIPE (MINIMUM 15 INCHES IN
 DIAMETER) TO BE INSTALLED WITHIN THE RIGHT OF WAY. NEW
 COMMENT ? NOT ALL PIPES ARE LABELED. PROPOSED STORM
 PIPES ON 25TH ST AT BROADWAY, ON BROADWAY AVE AT 24TH
 ST., BROADWAY AT NORTHWOOD RD LABELED AS 18" HDPE.
  
 NEW COMMENTS:
  
 17. INDICATE HOW THE EXISTING CATCH BASIN ON THE SOUTH
 SIDE OF 23RD ST EAST OF PINEWOOD DRIVE WILL CONNECT TO
 THE MS4.
  
 18. PROVIDE PRE- AND POST-DEVELOPMENT HGL CALCULATIONS
 FOR THE DRAINAGE SYSTEM ON BROADWAY AND 23RD STREET
 WITH THE ENGINEERING PERMIT SUBMITTAL.
  
 19. REVIEW DESIGN PLANS IN SFWMD PERMITS FOR 24TH ST
 AND 25TH ST AND OTHER PROJECTS IN THE VICINITY FOR
 STORM PIPE CONNECTIVITY. THE INLET ON THE SOUTH SIDE OF
 24TH ST EAST OF BROADWAY MAY BE CONNECTED TO A MANHOLE
 SOUTH OF THE STRUCTURE INSTEAD OF THE MANHOLE ON
 BROADWAY AVE.
  
 20. ADDITIONAL GRADES WILL BE NEEDED FOR THE
 ENGINEERING PERMIT SUBMITTAL.
  
 21. THE FINISHED FLOOR ELEVATIONS AND SPOT GRADES ON
 THE PGD PLANS PROVIDED WHERE THE CROSS SECTION SYMBOLS
 ARE WILL RESULT IN CROSS SLOPES STEEPER THAN THE MAX.
 2% SHOWN ON THE CROSS SECTIONS FOR THE PARKING AREA AND
 ALLOWED FOR THE SIDEWALK AREA.
  
 22. WILL THERE BE PEDESTRIAN ACCESS TO THE SOUTH SIDE
 OF 23RD STREET AT THE PINEWOOD AND BROADWAY
 INTERSECTIONS? SHOW CROSS WALKS AND CURB RAMPS.
  
 23. ALL CURB RAMPS WILL NEED TO BE BROUGHT UP TO
 CURRENT ADA STANDARDS IF THE PAVEMENT ADJACENT TO THE
 CURB RAMP IS DISTURBED OR OVERLAID.
  
 24. ADA MATS MAY BE NEEDED WHERE THE SIDEWALKS MEET
 DRIVEWAYS FOR THE GARAGES OR ALLEYS.
  
 25. SHEET C3.05:
 A. BUILDING A (NORTHWEST) SERVICE -
 1. CONFIRM PROPOSED 3" WATER SERVICE WILL CROSS AN 8"
 PVC SANITARY SEWER MAIN.
 2. CONFIRM TAP IS TO A 24" WM.
  
 B. BUILDING A (NORTHEAST) SERVICE - SHOW THE
 EXFILTRATION TRENCH.
  
 C. BUILDING A (SOUTHWEST) SERVICE - CONFIRM THE WATER
 SERVICE WILL CROSS 15" RCP STORM AND 8" PVC SEWER.
  
 D. BUILDING B SERVICE - SHOW PROPOSED STORM PIPE
 BETWEEN EXISTING INLETS.
  
 E. BUILDING A (SOUTHWEST) SERVICE -
 1. SHOULD BE LABELED SOUTHEAST?
 2. CONFIRM RCP STORM VS. HDPE STORM.
  
 26. SHOW BREAKS IN THE EXFILTRATION TRENCH IF WATER OR
 SEWER SERVICE LINES WILL CROSS IN THE ENVELOPE OF THE
 EXFILTRATION TRENCH.
  
 27. PROVIDE DETAILS OF THE CONTROL STRUCTURES WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
 28. SECTION B-B - LEFT SIDE OF SECTION IS LABELED AS
 18.4 FEET LANDSCAPING. WILL THERE BE A CONTINUOUS
 SIDEWALK ON THE WEST SIDE OF THE STREET?
  
 29. SECTION E-E - CONFIRM 2.5 FEET DIMENSION FOR THE
 TYPE 'F' CURB. SUM OF DIMENSIONS ACROSS RIGHT OF WAY IS
 LESS THAN 75 FEET.
  
 30. SECTION H-H - CONFIRM 2.5 FEET DIMENSION FOR THE
 TYPE 'F' CURB. SUM OF DIMENSIONS ACROSS RIGHT OF WAY IS
 MORE THAN 55 FEET.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  

Review Stop STORM STORMWATER
Rev No 2 Status F Date 04-14-2022 Cont ID  
Sent By tward Date 04-14-2022 Time 12:00 Rev Time 0.00
Received By tward Date 04-14-2022 Time 12:02 Sent To  
Notes
2022-04-14 12:02:10THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
  
 1. LABEL ALL THE STREETS ON ALL OF THE SHEETS. FOR
 EXAMPLE, SHEET C1.01 ONLY LABELS PINEWOOD AVE. NONE OF
 THE EAST-WEST STREETS ARE LABELED.
  
 2. COMPLETE THE PAVING, GRADING AND DRAINAGE NOTES ON
 THE PGD PLAN SHEETS. SOME OF THE NOTES DO NOT AGREE
 WITH THE VERTICAL DATUM LABEL AT THE BOTTOM OF THE
 SHEETS.
  
 3. EXFILTRATION TRENCH FOR TREATING RUNOFF FROM ONSITE
 AREAS SHALL NOT BE LOCATED WITHIN THE RIGHT OF WAY.
  
 4. ON SHEET C2.03 THERE IS A NEW DRAINAGE STRUCTURE ON
 THE EAST SIDE OF PINEWOOD AVE ABOUT 40 FEET NORTH OF
 THE CENTERLINE OF NORTHWOOD ROAD. THIS INLET IS SHOWN
 NEXT TO AN EXISTING INLET THAT IS BEING CONVERTED TO A
 VALLEY GUTTER INLET. IS THE NEW INLET NEEDED?
  
 5. WHAT WILL BE THE MAXIMUM CROSS SLOPE OF THE
 ON-STREET PARKING SPACES?
  
 6. LABEL THE PARKING AREAS ON THE CROSS SECTIONS.
  
 7. ADVISE IF THE WEST DROP CURB ON PINEWOOD AVE WILL BE
 PARALLEL TO THE WEST RIGHT OF WAY. THE 9.0 FT DIMENSION
 ON SECTION B-B DOES NOT APPEAR TO REACH THE 2 FEET DROP
 CURB.
  
 8. SIDEWALK CROSS SLOPES SHALL NOT EXCEED 2 PERCENT.
  
 9. THE DIMENSIONS FOR THE PARKING AREAS ON SECTION D-D
 AND SECTION E-E (FOR BROADWAY AVE) APPEAR TO INCLUDE
 THE TYPE 'D' CURB.
  
 10. EXTEND SECTION F-F TO THE PARKING LOT ON THE WEST
 SIDE OF PINEWOOD AVE. DIMENSION THE SIDEWALKS, CURB AND
 GUTTER, TRAVEL LANES AND PARKING AREA.
  
 11. DIMENSION MINIMUM BUILDING SETBACKS ON THE CROSS
 SECTIONS.
  
 12. PROVIDE CROSS SECTION OF BROADWAY AVE SOUTH OF
 NORTHWOOD ROAD. EXTEND SECTION FROM FACE OF BUILDING TO
 FACE OF BUILDING. DIMENSION SIDEWALKS, CURB AND GUTTER,
 PARKING AREAS, TRAVEL LANES, SETBACKS FROM R/W, ETC.
  
 13. REVISE THE PARKING SPACE STRIPING DETAIL TO MATCH
 CITY CODE.
  
 14. THE CITY DOES NOT ALLOW THE USE OF BLEEDERS WITH
 EXFILTRATION TRENCHES.
  
 15. LABEL RIGHT OF WAYS PROPOSED TO BE ABANDONED ON THE
 PLAN SHEETS.
  
 16. RCP PIPE (MINIMUM 15 INCHES IN DIAMETER) TO BE
 INSTALLED WITHIN THE RIGHT OF WAY.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH
 THE ENGINEERING PERMIT SUBMITTAL.
  
 2. PROVIDE COPY OF SFWMD ERP PERMIT BEFORE START OF
 CONSTRUCTION, IF REQUIRED.
  
 3. PROVIDE AN EROSION CONTROL PLAN WITH DETAILS.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  

Review Stop STORM STORMWATER
Rev No 1 Status F Date 11-18-2021 Cont ID  
Sent By tward Date 11-18-2021 Time 13:39 Rev Time 0.00
Received By tward Date 11-18-2021 Time 13:40 Sent To  
Notes
2021-11-18 13:40:31THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. THE CITY?S OFFICIAL VERTICAL DATUM PER CITY CODE IS
 NGVD1929. THE CITY IS ALLOWING SURVEYS AND PLANS TO USE
 NAVD1988 PROVIDED THE CONVERSION EQUATION BETWEEN
 NAVD1988 AND NGVD1929 IS ALSO PROVIDED. LIST THE
 CONVERSION EQUATION TO NGVD1929 ON THE SURVEY AND ON
 THE ENGINEERING PLANS.
  
 2. LABEL THE STREET NAMES ON THE CIVIL PLAN SHEETS.
  
 3. CONFIRM MATERIAL AND LAYOUT OF EXISTING STORMWATER
 SYSTEM ON 25TH ST.
  
 4. BROADWAY AVE NORTH OF 24TH STREET AND 24TH STREET
 EAST OF BROADWAY ARE MAINTAINED BY FDOT.
  
 5. MINIMUM 15? RCP TO BE INSTALLED WITHIN CITY R/W.
  
 6. CONFIRM EXISTING DRAINAGE STRUCTURES ARE LARGE
 ENOUGH TO ACCEPT NEW STORM PIPE CONNECTIONS.
  
 7. PROVIDE CROSS SECTIONS FROM CENTERLINE OF ROAD TO
 FACE OF BUILDING FOR EACH SIDE AND INTERIOR OF
 DEVELOPMENT.
  
  
 8. SHOW MILL AND PAVEMENT OVERLAY LIMITS ON THE PGD
 PLAN SHEETS.
  
 9. PROVIDE SUFFICIENT OVERHEAD CLEARANCE TO MAINTAIN
 UTILITIES WITHIN THE RIGHT OF WAY INCLUDING THE MAKING
 OF REPAIRS OR REPLACING PIPE AND/OR STRUCTURES WITH
 HEAVY EQUIPMENT.
  
 10. ACCESS EASEMENT FOR THE SIDEWALK ON 23RD ST MAY BE
 REQUIRED.
  
 11. SHOW ADA MATS FOR SIDEWALK RAMPS.
  
 12. EXFILTRATION TRENCHES NEXT TO BUILDINGS MAY MAKE
 REPLACEMENT OF THE SYSTEM IN THE FUTURE PROBLEMATIC.
 SUGGEST MOVING THE EXFILTRATION TRENCHES AWAY FROM THE
 BUILDINGS.
  
 13. IDENTIFY STORMWATER CONTROL STRUCTURES.
  
 14. THE CITY DOES NOT ALLOW THE USE OF BLEEDERS WITH
 EXFILTRATION TRENCHES.
  
 15. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA.
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. PROVIDE COPY OF SFWMD ERP PERMIT BEFORE START OF
 CONSTRUCTION.
  
 2. PROVIDE A COPY OF THE DRAINAGE CALCULATIONS WITH THE
 ENGINEERING PERMIT APPLICATION.
  
 3. ACCESS EASEMENT FOR THE SIDEWALK ON 23RD ST MAY BE
 REQUIRED.
  
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  

Review Stop SURVEY SURVEYING
Rev No 3 Status P Date 10-14-2022 Cont ID  
Sent By vnoel Date 10-14-2022 Time 09:27 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
2022-10-14 09:33:40PASSED WITH CONDITION THAT PREVIOUS COMMENTS CONCERNING
 REVISIONS TO FORCE MAIN, GRAVITY SEWER, ETC. THAT WAS
 DISCUSSED IN MEETING WITH DEVELOPER/ENGINEER WILL BE
 ADDRESSED IN ENGINEERING DEVELOPMENT PERMIT SUBMITTAL.

Review Stop SURVEY SURVEYING
Rev No 2 Status F Date 04-11-2022 Cont ID  
Sent By vnoel Date 04-11-2022 Time 10:20 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
2022-04-11 11:02:361. NO RESPONSE TO SURVEY COMMENTS FROM 11/17/2021.
 2. HEIGHT OF BUILDING C OVER ALLEY ALSO NEEDS TO BE 25
 FEET AS OVER PINEWOOD.

Review Stop SURVEY SURVEYING
Rev No 1 Status F Date 11-17-2021 Cont ID  
Sent By vnoel Date 11-17-2021 Time 08:34 Rev Time  
Received By vnoel Date   Time   Sent To  
Notes
2021-11-17 09:33:121. PROPERTY WILL REQUIRE A RE-PLAT.
 2. UTILITIES IS LOOKING INTO ABANDONMENT/RELOCATION OF
 SOME OF ITS FACILITIES.
 3. ADD CONVERSION TO NGVD-29 ON SURVEY AND CIVIL PLANS.
 4. AS BUILDING WILL BE SPANNING THE ENTIRE WIDTH OF THE
 RIGHT-OF-WAY(S), WILL THERE BE ANY SUPPORTS WITHIN THE
 R/W?
 5. NO METERS OR BACKFLOWS ALLOWED IN SIDEWALKS. NEED
 BLOWUP WITH DIMENSIONS FOR THOSE AREAS.
 6. RELOCATE STORM MANHOLE FROM CURBING IN ROUNDABOUT.
 7. AERIAL ENCROACHMENT AGREEMENT WILL BE REQUIRED FOR
 SPANNED RIGHT-OF-WAYS ALONG WITH MAINTENANCE AGREEMENTS
 FOR IMPROVEMENTS IN R/W.
 8. NEED FDOT APPROVAL/ACCEPTANCE OF IMPROVEMENTS ALONG
 BROADWAY.
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 5 Status P Date 10-19-2022 Cont ID  
Sent By   Date 10-19-2022 Time   Rev Time 0.00
Received By   Date 10-19-2022 Time   Sent To  
Notes
2022-10-19 17:17:01APPROVED WITH THE FOLLOWING CONDITIONS:
  
 1) PROVIDE A CLEAN, DEDICATED TRANSPORTATION SITE PLAN
 DEPICTING ALL RELATED ROADWAY AND TRANSPORTATION
 FEATURES, FULLY DIMENSIONED AND SHOWCASING CURB DETAILS
 ON THE OPPOSITE SIDE OF THE ROAD FRONTING THE PROPOSED
 DEVELOPMENT. PLEASE KEEP IN MIND THAT THIS COMMENT WAS
 PROVIDED AT THE VERY FIRST PPRC REVIEW AND WAS NEVER
 COMPLETELY FULFILLED
 2) PROVIDE A REVISED AUTOTURN ANALYSIS SHOWCASING
 SERVICE VEHICLES ACCESSING/EXITING THE FACILITY,
 MANEUVERING AT EACH POSSIBLE LOADING OR SANITATION
 ZONE(S), WITH BOTH DYNAMIC AND WHEEL PATHS HIGHLIGHTED
 IN SEPARATE COLORS
 3) PROVIDE A LIST OF ON-GOING ITEMS UNDER DISCUSSION OR
 REVIEW WITH COUNTY AND FDOT. OBTAIN COUNTY AND/OR FDOT
 APPROVAL PERTAINING THE PORTION OF THE PROPOSED
 DEVELOPMENT IMPACTING THEIR RIGHT OF WAY
 4) INSTALL AND SHOW SHARROW MARKINGS ALONG 23RD ST AND
 PINEWOOD AVE
 5) 25TH ST ROADWAY DESIGN SHOULD ACCOMMODATE THE
 PLANNED SEPARATED AND ELEVATED BICYCLE LANES FROM
 AUSTRALIAN TO BROADWAY. PLEASE REFER TO THE CITY
 BICYCLE MASTERPLAN FOR TYPICAL SECTION(S) AND UPDATE
 THE SITE PLANS ACCORDINGLY. NOTE: CITY MAY NOT REQUIRE
 THE DEVELOPER TO IMPLEMENT SUCH FEATURE ALONG SITE
 FRONTAGE; HOWEVER, ROW MUST BE PRESERVED AND PROVIDED
 TO ACCOMMODATE ITS FUTURE IMPLEMENTATION
 6) THE PROPOSED PINEWOOD AVENUE RE-ALIGNMENT IS NOT
 CONDUCIVE TO A SAFE VEHICULAR STRAIGHT-THROUGH MOVEMENT
 ACROSS THE 25TH AND 23RD INTERSECTIONS. SUCH MOVEMENT
 SHOULD BE EITHER FORBIDDEN OR FACILITATED BY SIGNAGE,
 STRIPING AND ROADWAY FEATURES SUCH AS FLEXIBLE POLES,
 MIDDLE RAISED ISLANDS AND CHANNELIZATION. PLEASE REVISE
 THE SITE PLANS ACCORDINGLY
 7) INSTALL AND SHOWCASE STOP BARS AND SIGNS ON EACH
 GARAGE LEVEL. IT IS RECOMMENDED TO TREAT THE NORTHERN
 AND SOUTHERN EAST-WEST DRIVE AISLES AS THE MAIN ONES,
 WHILE THE NORTH-SOUTH AS MINOR
 8) DIRECTIONAL ARROW PAVEMENT MARKINGS ARE MISSING.
 PLEASE INSERT THEM IN THE TRANSPORTATION SITE PLAN
 THROUGHOUT WERE NEEDED (E.G. RIGHT ARROW FOR THE
 SOUTHBOUND MOVEMENT, LEFT ARROW FOR THE EASTBOUND
 MOVEMENT AT THE 23RD AND PINEWOOD INTERSECTION)
  
 PAST AND LATEST COMMENTS, FOR REFERENCE PURPOSES
  
 TRAFFIC COMMENTS
 1) SATISFIED. PROVIDE UPDATED COUNTY TPS LETTER ONCE
 AVAILABLE
 2) SATISFIED. SUBMITTED TRAFFIC STUDY NEEDS REVISION AS
 THE TRIP GENERATION RATES DO NOT REPRESENT THE LATEST
 SITE PLAN
 3) SATISFIED. SCHEDULE A METHODOLOGY MEETING WITH THE
 TRANSPORTATION ENGINEERING GROUP. PRIOR TO ANY REVISION
 OR RESUBMISSION
 4) SATISFIED. REVISE THE TRAFFIC STUDY TO ALSO INCLUDE
 RESIDENTIAL TRIPS IN THE SIGNIFICANCE ANALYSIS. CRCEA
 EXEMPTION ONLY APPLIES TO COUNTY CONCURRENCY. TEST 2
 MAY BE NEEDED
 5) SATISFIED. PLEASE ELABORATE ON THE IMPROVEMENTS
 NEEDED TO ACCOMMODATE FUTURE BACKGROUND TRAFFIC AND
 THEIR CAPACITY FOR THE PROPOSED PROJECT TRAFFIC
 6) SATISFIED. KEEP THE INTERSECTION OF 25TH AND
 PINEWOOD UNDER EXISTING TWO-WAY STOP CONTROL
 CONFIGURATION
 7) SATISFIED. IMPLEMENT A LEFT-TURN LANE, NOT A TWLT
 ONE, ON THE EAST AND WEST APPROACH OF THE 25TH AND
 PINEWOOD INTERSECTION
 SITE COMMENTS
 8) PARTIALLY SATISFIED. PROVIDE A CLEAN SITE PLAN,
 SHOWCASING ONLY TRANSPORTATION FEATURES (I.E. ROAD,
 CURB, GUTTER, SIDEWALK, DRIVEWAY, PAVEMENT MARKING,
 SIGNAGE, PATHWAY, WALKWAY, PEDESTRIAN CROSSING, LOADING
 ZONE, PICK-UP/DROP-OFF AREA) AND CORRESPONDING
 DIMENSIONS. SHEET C2.01-C3.04 ARE UNACCEPTABLE, AS THEY
 ARE OVERCROWDED WITH UNRELATED ITEMS AND MISSING
 SEVERAL TRANSPORTATION FEATURES. ALSO, DIMENSIONS FOR
 ALL LISTED TRANSPORTATION FEATURES ARE MISSING. A
 DEDICATED SITE PLAN IS A CRITICAL ITEM FOR A PROPER
 TRANSPORTATION REVIEW CONSIDERING THE SIGNIFICANT
 IMPACT OF THE PROPOSED DEVELOPMENT TO THE EXISTING
 NETWORK. SEVERAL DIMENSIONS ARE STILL MISSING IN THE
 LATEST RESUBMISSION (SEPTEMBER 2022)
 9) PARTIALLY SATISFIED. ON THE SITE PLAN, PLEASE
 SHOWCASE BASIC CURB DETAILS (I.E. DRIVEWAY AND PARKING
 STALLS) ON THE OPPOSITE SIDE OF THE ROADS SURROUNDING
 THE PROPOSED DEVELOPMENT. PLEASE PROVIDE DOCUMENT NAME
 AND SHEET NUMBER SHOWCASING SUCH FEATURES. DETAILS
 MISSING FOR THE FOLLOWING LOCATION: SOUTH SIDE OF 23RD
 ST, EAST SIDE OF BROADWAY, NORTH SIDE OF 25TH ST.
 SEVERAL PAVEMENT MARKINGS ARE STILL MISSING IN THE
 LATEST RESUBMISSION (SEPTEMBER 2022)
 10) PARTIALLY SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR
 GARBAGE TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND
 OUT OF THE PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC
 ENVELOPES CLEARLY DEFINED. ANALYSIS SHOULD BE PROVIDED
 IN A SEPARATE FILE/DRAWING. PLEASE PROVIDE DOCUMENT
 NAME AND SHEET NUMBER SHOWCASING THE ANALYSIS. SHEET
 C4.01 IS INCOMPLETE, GARBAGE VEHICLES SHOULD BE SHOWN
 TURNING-IN/ENTERING AND TURNING-OUT/EXITING THE
 PREMISES OF THE PROPOSED DEVELOPMENT. PLEASE COORDINATE
 WITH SANITATION SERVICES REGARDING TYPICAL FUTURE
 ROUTE(S)
 11) SATISFIED. IDENTIFY AND DESIGNATE TWO OR MORE
 ACCESSIBLE MICRO-MOBILITY STATION AREAS (MINIMUM 8 X 20
 FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS. FOR
 THE LATTER ITEM, MORE SPECIFICALLY: A CONDUIT (2???
 SCHEDULE 40 PVC) TO THE POWER SOURCE WITH AN ELECTRICAL
 PULL BOX (240V ??? 10,000W CIRCUIT). PLEASE PROVIDE
 DOCUMENT NAME AND SHEET NUMBER SHOWCASING SUCH FEATURE
 12) PARTIALLY SATISFIED. OBTAIN COUNTY AND/OR FDOT
 APPROVAL PERTAINING THE PORTION OF THE PROPOSED
 DEVELOPMENT IMPACTING THEIR RIGHT OF WAY. COMMENT WILL
 BE SATISFIED ONCE APPROVAL DOCUMENTATION IS PROVIDED.
 IN THE MEANTIME, PROVIDE A LIST OF ON-GOING ITEMS UNDER
 DISCUSSION OR REVIEW WITH COUNTY AND FDOT
 13) SATISFIED. GARAGE RAMP ON 25TH ST NEEDS TO BE
 RELOCATED. FRA REGULATIONS REQUIRE A MINIMUM DISTANCE
 OF 60 FEET FROM RAILROAD CROSSING???S GATE ARM
 14) PARTIALLY SATISFIED. PROPER TURNAROUND SPACE NEEDS
 TO BE PROVIDED AT EACH DEAD END WITHIN THE GARAGE.
 PLEASE PROVIDE DOCUMENT NAME AND SHEET NUMBER. PROVIDE
 A TURNAROUND SPACE ON THE NORTH-WEST CORNER OF THE
 GARAGE LEVEL 2
 15) INSTALL AND SHOW SHARROW MARKINGS ALONG 23RD ST
 16) INSTALL AND SHOW SHARROW MARKINGS ALONG PINEWOOD
 AVE
 17) 25TH ST ROADWAY DESIGN SHOULD ACCOMMODATE THE
 PLANNED SEPARATED AND ELEVATED BICYCLE LANES FROM
 AUSTRALIAN TO BROADWAY. PLEASE REFER TO THE CITY
 BICYCLE MASTERPLAN FOR TYPICAL SECTION(S)
 18) DIRECTIONAL ARROW PAVEMENT MARKINGS ARE MISSING.
 PLEASE INSERT THEM THROUGHOUT WERE NEEDED (E.G. RIGHT
 ARROW FOR THE SOUTHBOUND MOVEMENT, LEFT ARROW FOR THE
 EASTBOUND MOVEMENT AT THE 23RD AND PINEWOOD
 INTERSECTION)
 19) PROVIDE A MINIMUM OF 8-FEET WIDE UN-OBSTRUCTED
 PEDESTRIAN WALKABLE AREA ALONG EACH OF THE ROADS
 TRAVERSING OR FRONTING THE PROPOSED DEVELOPMENT.
 SIDEWALK WIDTH IS INSUFFICIENT ALONG 25TH, OTHER
 STREETS CANNOT BE VERIFIED AS DIMENSIONS ARE MISSING
 20) INSTALL AND SHOWCASE STOP BARS AND SIGNS ON EACH
 GARAGE LEVEL. IT IS RECOMMENDED TO TREAT THE NORTHERN
 AND SOUTHERN EAST-WEST DRIVE AISLES AS THE MAIN ONES,
 WHILE THE NORTH-SOUTH AS MINOR
 21) PER CITY CODE 94-111(Q)(2) RAMP WITH SLOPES GREATER
 THAN 14% MUST PROVIDE A BREAK-OVER TRANSITION
 22) THE PROPOSED PINEWOOD AVENUE RE-ALIGNMENT IS NOT
 CONDUCIVE TO A SAFE VEHICULAR STRAIGHT-THROUGH MOVEMENT
 ACROSS THE 25TH AND 23RD INTERSECTIONS. SUCH MOVEMENT
 SHOULD BE EITHER FORBIDDEN OR FACILITATED BY SIGNAGE,
 STRIPING AND ROADWAY FEATURES SUCH AS FLEXIBLE POLES,
 MIDDLE RAISED ISLANDS AND CHANNELIZATION. PLEASE REVISE
 THE SITE PLAN ACCORDINGLY
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 4 Status F Date 07-28-2022 Cont ID  
Sent By   Date 07-28-2022 Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
2022-07-28 12:50:15NONE OF THE TRANSPORTATION COMMENTS HAVE BEEN ADDRESSED
 IN THE RESPONSE LETTER.
  
 TRAFFIC COMMENTS
 1) PARTIALLY SATISFIED. PROVIDE UPDATED COUNTY TPS
 LETTER ONCE AVAILABLE
 2) SATISFIED. SUBMITTED TRAFFIC STUDY NEEDS REVISION AS
 THE TRIP GENERATION RATES DO NOT REPRESENT THE LATEST
 SITE PLAN
 3) NOT SATISFIED. SCHEDULE A METHODOLOGY MEETING WITH
 THE TRANSPORTATION ENGINEERING GROUP. PRIOR TO ANY
 REVISION OR RESUBMISSION
 4) NOT SATISFIED. REVISE THE TRAFFIC STUDY TO ALSO
 INCLUDE RESIDENTIAL TRIPS IN THE SIGNIFICANCE ANALYSIS.
 CRCEA EXEMPTION ONLY APPLIES TO COUNTY CONCURRENCY.
 TEST 2 MAY BE NEEDED
 5) NOT SATISFIED. PLEASE ELABORATE ON THE IMPROVEMENTS
 NEEDED TO ACCOMMODATE FUTURE BACKGROUND TRAFFIC AND
 THEIR CAPACITY FOR THE PROPOSED PROJECT TRAFFIC
 6) NOT SATISFIED. KEEP THE INTERSECTION OF 25TH AND
 PINEWOOD UNDER EXISTING TWO-WAY STOP CONTROL
 CONFIGURATION
 7) NOT SATISFIED. IMPLEMENT A LEFT-TURN LANE, NOT A
 TWLT ONE, ON THE EAST AND WEST APPROACH OF THE 25TH AND
 PINEWOOD INTERSECTION
  
 SITE COMMENTS
 8) NOT SATISFIED. PROVIDE A CLEAN SITE PLAN, SHOWCASING
 ONLY TRANSPORTATION FEATURES (I.E. ROAD, CURB, GUTTER,
 SIDEWALK, DRIVEWAY, PAVEMENT MARKING, SIGNAGE, PATHWAY,
 WALKWAY, PEDESTRIAN CROSSING, LOADING ZONE,
 PICK-UP/DROP-OFF AREA) AND CORRESPONDING DIMENSIONS.
 SHEET C2.01-C3.04 ARE UNACCEPTABLE, AS THEY ARE
 OVERCROWDED WITH UNRELATED ITEMS AND MISSING SEVERAL
 TRANSPORTATION FEATURES. ALSO, DIMENSIONS FOR ALL
 LISTED TRANSPORTATION FEATURES ARE MISSING. A DEDICATED
 SITE PLAN IS A CRITICAL ITEM FOR A PROPER
 TRANSPORTATION REVIEW CONSIDERING THE SIGNIFICANT
 IMPACT OF THE PROPOSED DEVELOPMENT TO THE EXISTING
 NETWORK.
 9) NOT SATISFIED. ON THE SITE PLAN, PLEASE SHOWCASE
 BASIC CURB DETAILS (I.E. DRIVEWAY AND PARKING STALLS)
 ON THE OPPOSITE SIDE OF THE ROADS SURROUNDING THE
 PROPOSED DEVELOPMENT. PLEASE PROVIDE DOCUMENT NAME AND
 SHEET NUMBER SHOWCASING SUCH FEATURES. DETAILS MISSING
 FOR THE FOLLOWING LOCATION: SOUTH SIDE OF 23RD ST, EAST
 SIDE OF BROADWAY, NORTH SIDE OF 25TH ST,
 10) PARTIALLY SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR
 GARBAGE TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND
 OUT OF THE PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC
 ENVELOPES CLEARLY DEFINED. ANALYSIS SHOULD BE PROVIDED
 IN A SEPARATE FILE/DRAWING. PLEASE PROVIDE DOCUMENT
 NAME AND SHEET NUMBER SHOWCASING THE ANALYSIS. SHEET
 C4.01 SHOWS VEHICLE DYNAMIC ENCLOSURE ENCROACHMENTS
 11) PARTIALLY SATISFIED. IDENTIFY AND DESIGNATE TWO OR
 MORE ACCESSIBLE MICRO-MOBILITY STATION AREAS (MINIMUM 8
 X 20 FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS.
 FOR THE LATTER ITEM, MORE SPECIFICALLY: A CONDUIT (2?
 SCHEDULE 40 PVC) TO THE POWER SOURCE WITH AN ELECTRICAL
 PULL BOX (240V 10,000W CIRCUIT). PLEASE PROVIDE
 DOCUMENT NAME AND SHEET NUMBER SHOWCASING SUCH FEATURE
 12) PARTIALLY SATISFIED. OBTAIN COUNTY AND/OR FDOT
 APPROVAL PERTAINING THE PORTION OF THE PROPOSED
 DEVELOPMENT IMPACTING THEIR RIGHT OF WAY. COMMENT WILL
 BE SATISFIED ONCE APPROVAL DOCUMENTATION IS PROVIDED.
 IN THE MEANTIME, PROVIDE A LIST OF ON-GOING ITEMS UNDER
 DISCUSSION OR REVIEW WITH COUNTY AND FDOT
 13) SATISFIED. GARAGE RAMP ON 25TH ST NEEDS TO BE
 RELOCATED. FRA REGULATIONS REQUIRE A MINIMUM DISTANCE
 OF 60 FEET FROM RAILROAD CROSSING'S GATE ARM
 14) PARTIALLY SATISFIED. PROPER TURNAROUND SPACE NEEDS
 TO BE PROVIDED AT EACH DEAD END WITHIN THE GARAGE.
 PLEASE PROVIDE DOCUMENT NAME AND SHEET NUMBER.
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 3 Status F Date 06-22-2022 Cont ID  
Sent By   Date 06-22-2022 Time   Rev Time 0.00
Received By   Date 06-22-2022 Time   Sent To  
Notes
2022-06-22 23:00:45TRAFFIC COMMENTS
 1) PARTIALLY SATISFIED. PROVIDE UPDATED COUNTY TPS
 LETTER ONCE AVAILABLE
 2) SATISFIED. SUBMITTED TRAFFIC STUDY NEEDS REVISION AS
 THE TRIP GENERATION RATES DO NOT REPRESENT THE LATEST
 SITE PLAN
 3) NOT SATISFIED. SCHEDULE A METHODOLOGY MEETING WITH
 THE TRANSPORTATION ENGINEERING GROUP. PRIOR TO ANY
 REVISION OR RESUBMISSION
 4) NOT SATISFIED. REVISE THE TRAFFIC STUDY TO ALSO
 INCLUDE RESIDENTIAL TRIPS IN THE SIGNIFICANCE ANALYSIS.
 CRCEA EXEMPTION ONLY APPLIES TO COUNTY CONCURRENCY.
 TEST 2 MAY BE NEEDED
 5) NOT SATISFIED. PLEASE ELABORATE ON THE IMPROVEMENTS
 NEEDED TO ACCOMMODATE FUTURE BACKGROUND TRAFFIC AND
 THEIR CAPACITY FOR THE PROPOSED PROJECT TRAFFIC
 6) NOT SATISFIED. KEEP THE INTERSECTION OF 25TH AND
 PINEWOOD UNDER EXISTING TWO-WAY STOP CONTROL
 CONFIGURATION
 7) NOT SATISFIED. IMPLEMENT A LEFT-TURN LANE, NOT A
 TWLT ONE, ON THE EAST AND WEST APPROACH OF THE 25TH AND
 PINEWOOD INTERSECTION
  
 SITE COMMENTS
 8) NOT SATISFIED. PROVIDE A CLEAN SITE PLAN, SHOWCASING
 ONLY TRANSPORTATION FEATURES (I.E. ROAD, CURB, GUTTER,
 SIDEWALK, DRIVEWAY, PAVEMENT MARKING, SIGNAGE, PATHWAY,
 WALKWAY, PEDESTRIAN CROSSING, LOADING ZONE,
 PICK-UP/DROP-OFF AREA) AND CORRESPONDING DIMENSIONS.
 SHEET C2.01-C3.04 ARE UNACCEPTABLE, AS THEY ARE
 OVERCROWDED WITH UNRELATED ITEMS AND MISSING SEVERAL
 TRANSPORTATION FEATURES. ALSO, DIMENSIONS FOR ALL
 LISTED TRANSPORTATION FEATURES ARE MISSING. A DEDICATED
 SITE PLAN IS A CRITICAL ITEM FOR A PROPER
 TRANSPORTATION REVIEW CONSIDERING THE SIGNIFICANT
 IMPACT OF THE PROPOSED DEVELOPMENT TO THE EXISTING
 NETWORK.
 9) NOT SATISFIED. ON THE SITE PLAN, PLEASE SHOWCASE
 BASIC CURB DETAILS (I.E. DRIVEWAY AND PARKING STALLS)
 ON THE OPPOSITE SIDE OF THE ROADS SURROUNDING THE
 PROPOSED DEVELOPMENT. PLEASE PROVIDE DOCUMENT NAME AND
 SHEET NUMBER SHOWCASING SUCH FEATURES. DETAILS MISSING
 FOR THE FOLLOWING LOCATION: SOUTH SIDE OF 23RD ST, EAST
 SIDE OF BROADWAY, NORTH SIDE OF 25TH ST,
 10) PARTIALLY SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR
 GARBAGE TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND
 OUT OF THE PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC
 ENVELOPES CLEARLY DEFINED. ANALYSIS SHOULD BE PROVIDED
 IN A SEPARATE FILE/DRAWING. PLEASE PROVIDE DOCUMENT
 NAME AND SHEET NUMBER SHOWCASING THE ANALYSIS. SHEET
 C4.01 SHOWS VEHICLE DYNAMIC ENCLOSURE ENCROACHMENTS
 11) PARTIALLY SATISFIED. IDENTIFY AND DESIGNATE TWO OR
 MORE ACCESSIBLE MICRO-MOBILITY STATION AREAS (MINIMUM 8
 X 20 FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS.
 FOR THE LATTER ITEM, MORE SPECIFICALLY: A CONDUIT (2"
 SCHEDULE 40 PVC) TO THE POWER SOURCE WITH AN ELECTRICAL
 PULL BOX (240V - 10,000W CIRCUIT). PLEASE PROVIDE
 DOCUMENT NAME AND SHEET NUMBER SHOWCASING SUCH FEATURE
 12) PARTIALLY SATISFIED. OBTAIN COUNTY AND/OR FDOT
 APPROVAL PERTAINING THE PORTION OF THE PROPOSED
 DEVELOPMENT IMPACTING THEIR RIGHT OF WAY. COMMENT WILL
 BE SATISFIED ONCE APPROVAL DOCUMENTATION IS PROVIDED.
 IN THE MEANTIME, PROVIDE A LIST OF ON-GOING ITEMS UNDER
 DISCUSSION OR REVIEW WITH COUNTY AND FDOT
 13) SATISFIED. GARAGE RAMP ON 25TH ST NEEDS TO BE
 RELOCATED. FRA REGULATIONS REQUIRE A MINIMUM DISTANCE
 OF 60 FEET FROM RAILROAD CROSSING?S GATE ARM
 14) PARTIALLY SATISFIED. PROPER TURNAROUND SPACE NEEDS
 TO BE PROVIDED AT EACH DEAD END WITHIN THE GARAGE.
 PLEASE PROVIDE DOCUMENT NAME AND SHEET NUMBER.
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 2 Status F Date 04-14-2022 Cont ID  
Sent By   Date 04-14-2022 Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
2022-04-14 12:22:25TRAFFIC COMMENTS
 1) PROVIDE COUNTY TPS LETTER
 2) SUBMITTED TRAFFIC STUDY NEEDS REVISION AS THE TRIP
 GENERATION RATES DO NOT REPRESENT THE LATEST SITE PLAN
 3) SCHEDULE A METHODOLOGY MEETING WITH THE
 TRANSPORTATION ENGINEERING GROUP. PRIOR TO ANY REVISION
 OR RESUBMISSION.
  
 SITE COMMENTS
 4) PROVIDE A CLEAN SITE PLAN, SHOWCASING ONLY
 TRANSPORTATION FEATURES (I.E. ROAD, CURB, GUTTER,
 SIDEWALK, DRIVEWAY, PAVEMENT MARKING, SIGNAGE, PATHWAY,
 WALKWAY, PEDESTRIAN CROSSING, LOADING ZONE,
 PICK-UP/DROP-OFF AREA) AND CORRESPONDING DIMENSIONS
 5) ON THE SITE PLAN, PLEASE SHOWCASE BASIC CURB DETAILS
 (I.E. DRIVEWAY AND PARKING STALLS) ON THE OPPOSITE SIDE
 OF THE ROADS SURROUNDING THE PROPOSED DEVELOPMENT.
 PLEASE PROVIDE DOCUMENT NAME AND SHEET NUMBER
 SHOWCASING SUCH FEATURES.
 6) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND/OR
 SERVICE VEHICLES DRIVING IN AND OUT OF THE PROPOSED
 DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES CLEARLY
 DEFINED. ANALYSIS SHOULD BE PROVIDED IN A SEPARATE
 FILE/DRAWING. PLEASE PROVIDE DOCUMENT NAME AND SHEET
 NUMBER SHOWCASING THE ANALYSIS.
 7) IDENTIFY AND DESIGNATE TWO OR MORE ACCESSIBLE
 MICRO-MOBILITY STATION AREAS (MINIMUM 8 X 20 FEET) AND
 PROVIDE BASIC ELECTRIFICATION READINESS. FOR THE LATTER
 ITEM, MORE SPECIFICALLY: A CONDUIT (2? SCHEDULE 40 PVC)
 TO THE POWER SOURCE WITH AN ELECTRICAL PULL BOX (240V ?
 10,000W CIRCUIT). PLEASE PROVIDE DOCUMENT NAME AND
 SHEET NUMBER SHOWCASING SUCH FEATURE
 8) OBTAIN COUNTY AND/OR FDOT APPROVAL PERTAINING THE
 PORTION OF THE PROPOSED DEVELOPMENT IMPACTING THEIR
 RIGHT OF WAY
 9) GARAGE RAMP ON 25TH ST NEEDS TO BE RELOCATED. FRA
 REGULATIONS REQUIRE A MINIMUM DISTANCE OF 60 FEET FROM
 RAILROAD CROSSING?S GATE ARM
 10) PROPER TURNAROUND SPACE NEEDS TO BE PROVIDED AT
 EACH DEAD END WITHIN THE GARAGE
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status F Date 11-18-2021 Cont ID  
Sent By   Date 11-18-2021 Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
2021-11-18 12:30:13TRAFFIC COMMENTS
 1) PROVIDE COUNTY TPS LETTER
 2) SUBMITTED TRAFFIC STUDY NEEDS REVISION AS THE TRIP
 GENERATION RATES DO NOT REPRESENT THE LATEST SITE PLAN
 3) SCHEDULE A METHODOLOGY MEETING WITH THE
 TRANSPORTATION ENGINEERING GROUP. PRIOR TO ANY REVISION
 OR RESUBMISSION.
  
 SITE COMMENTS
 4) PROVIDE A CLEAN SITE PLAN, SHOWCASING ONLY
 TRANSPORTATION FEATURES (I.E. ROAD, CURB, GUTTER,
 SIDEWALK, DRIVEWAY, PAVEMENT MARKING, SIGNAGE, PATHWAY,
 WALKWAY, PEDESTRIAN CROSSING, LOADING ZONE,
 PICK-UP/DROP-OFF AREA) AND CORRESPONDING DIMENSIONS
 5) ON THE SITE PLAN, PLEASE SHOWCASE BASIC CURB DETAILS
 (I.E. DRIVEWAY AND PARKING STALLS) ON THE OPPOSITE SIDE
 OF THE ROADS SURROUNDING THE PROPOSED DEVELOPMENT.
 PLEASE PROVIDE DOCUMENT NAME AND SHEET NUMBER
 SHOWCASING SUCH FEATURES.
 6) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND/OR
 SERVICE VEHICLES DRIVING IN AND OUT OF THE PROPOSED
 DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES CLEARLY
 DEFINED. ANALYSIS SHOULD BE PROVIDED IN A SEPARATE
 FILE/DRAWING. PLEASE PROVIDE DOCUMENT NAME AND SHEET
 NUMBER SHOWCASING THE ANALYSIS.
 7) IDENTIFY AND DESIGNATE TWO EASILY ACCESSIBLE
 MICRO-MOBILITY STATION AREAS (MINIMUM 8 X 30 FEET) AND
 PROVIDE BASIC ELECTRIFICATION READINESS. FOR THE LATTER
 ITEM, MORE SPECIFICALLY: A CONDUIT (2" SCHEDULE 40 PVC)
 TO THE POWER SOURCE WITH AN ELECTRICAL PULL BOX (240V
 CIRCUIT). PLEASE PROVIDE DOCUMENT NAME AND SHEET NUMBER
 SHOWCASING SUCH FEATURE.
 8) PROVIDE PARKING TABLE SHOWCASING THE NUMBER OF
 REQUIRED AND PROVIDED PARKING SPACES, INCLUSIVE OF ADA
 AND BICYCLE ONES
 9) OBTAIN COUNTY AND/OR FDOT APPROVAL PERTAINING THE
 PORTION OF THE PROPOSED DEVELOPMENT IMPACTING THEIR
 RIGHT OF WAY
 10) PROPER TURNAROUND SPACE NEEDS TO BE PROVIDED AT
 EACH DEAD END WITHIN THE GARAGE
 11) NONE OF THE PROPOSED LOADING ZONES ARE CURRENTLY
 FEASIBLE. AS CITY CODE FORBIDS MANEUVERING ON PUBLIC
 ROW
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop Z ZONING
Rev No 10 Status F Date 06-13-2023 Cont ID  
Sent By eschneid Date 06-13-2023 Time 13:29 Rev Time 1.00
Received By eschneid Date 05-08-2023 Time 15:07 Sent To  
Notes
2023-06-13 13:25:42FAILED
  
 REPEAT COMMENT: THE LATEST RESUBMITTED PLANS ARE NOT
 INTERNALLY CONSISTENT (CIVIL, LANDSCAPE, ARCHITECTURAL)
 NOR DO THEY MATCH THE PLANS SUBMITTED AS PART OF THE
 FOUNDATION/SHELL PERMIT FOR BUILDING A (NOR DO THEY
 APPEAR TO FULLY MATCH BUILDINGS B AND C). STAFF HAS
 BEEN TOLD THAT THE FOUNDATION SET IS THE TRUE BUILDING
 LAYOUT.
  
 ALL PLANS MUST MATCH WHAT IS SHOWN WHEN THE COMMENTS ON
 FOUNDATION PERMIT 22110628 ARE ADDRESSED AND MEET THE
 NMUD REGULATIONS OR THE APPROVED WAIVERS/VARIANCES
 APPROVED AS PART OF THE LEVEL 3 SPECIAL REVIEW.
  
 PLEASE REVIEW THE COMMENTS WITH PERMIT NUMBER 22110628.
  
 PLEASE NOTE THAT SINCE PREVIOUSLY ISSUED COMMENTS
 CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($600).
  
 CONTACT ERIC SCHNEIDER @ 561-822-1446
 [email protected]
  

Review Stop Z ZONING
Rev No 9 Status F Date 04-20-2023 Cont ID  
Sent By eschneid Date 04-20-2023 Time 11:46 Rev Time 2.00
Received By eschneid Date 04-20-2023 Time 11:46 Sent To  
Notes
2023-04-20 11:51:40CASE NO. PB 1895 FORMAL SITE PLAN - APRIL 6, 2023
 RESUBMITTAL
 NORTHWOOD COMMONS
 2501 BROADWAY
  
 - CONTACT ERIC SCHNEIDER @ (561) 822-1446,
 [email protected]
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE TWO (2) PAPER
 COPIES AND AN ELECTRONIC COPY IN .PDF FORMAT OF ALL
 PLANS. PLEASE NOTE THAT CHANGES ON THE RESUBMITTED
 PLANS OR THE SUBMITTAL OF INFORMATION/PLANS TO ADDRESS
 THE COMMENTS MAY RESULT IN ADDITIONAL COMMENTS.
  
 THE LEVEL III SPECIAL REVIEW, INCLUDING THE VARIANCES,
 WAS APPROVED BY THE PLANNING BOARD ON NOVEMBER 15,
 2022. THE ARCHITECTURAL, LANDSCAPE AND CIVIL PLANS,
 COLLECTIVELY, THE FORMAL SITE PLAN, IS NOT APPROVED.
 THE PLANS REVIEWED BY STAFF FOR THE NOVEMBER 15, 2022
 PLANNING BOARD MEETING WERE USED TO DETERMINE THE
 REQUESTED VARIANCES AND WAIVERS REQUIRED BY THE PROJECT
 AND TO VERIFY GENERALLY THAT THE PROJECT MET NMUD CODE
 REQUIREMENTS. TWO CONDITIONS OF THE LEVEL III SPECIAL
 REVIEW APPROVAL WERE, "FINAL SITE DEVELOPMENT PLANS
 MUST BE SUBMITTED TO THE PLANNING DIVISION AND PASS THE
 FORMAL SITE PLAN REVIEW PROCESS." AND "THE FINAL
 ELEVATIONS MUST BE APPROVED BY THE HISTORIC
 PRESERVATION DIVISION PRIOR TO THE APPROVAL OF THE
 FORMAL SITE PLAN."
  
 THE PLANS SUBMITTED FOR THE HISTORIC REVIEW ON DECEMBER
 5, 2022, INCLUDED CHANGES TO BUILDING C. PLANNING STAFF
 REQUESTED ADDITIONAL INFORMATION TO VERIFY THAT THE
 CHANGES STILL MET BOTH THE NMUD REGULATIONS AND THE
 VARIANCES THAT WERE GRANTED BY THE PLANNING BOARD. ON
 JANUARY 3, 2023, PLANNING STAFF WAS PROVIDED WITH
 REVISED PLANS FOR BOTH BUILDINGS A AND C AND INFORMED
 THAT THE ARCHITECT HAD MADE SOME CHANGES. STAFF ISSUED
 COMMENTS AND REVIEWED ADDITIONAL PARTIAL SUBMITTALS
 MADE ON JANUARY 19, 2023 AND FEBRUARY 28, 2023. EACH
 SET OF PLANS INCLUDED SOME CORRECTIONS, BUT ALSO
 INCLUDED NEW CHANGES. NONE OF THE NEW CHANGES WERE
 HIGHLIGHTED AND THE PLANS THAT WERE INCLUDED WERE
 INTERNALLY INCONSISTENT.
  
 THE APRIL 6, 2023 SUBMITTAL WAS TO INCLUDE ALL THE PLAN
 REVISIONS MADE TO DATE IN ONE SET OF INTERNALLY
 CONSISTENT PLANS SO THAT THE FORMAL SITE PLAN COULD BE
 ISSUED. STAFF BEGAN TO REVIEW THE ARCHITECTURAL PLAN
 SET AND NOTED THAT THE MAJORITY OF THE PLANS REVERTED
 TO THE OUTDATED NOVEMBER 15, 2022 PLANS. THE SUBMITTAL
 DID INCLUDE A FEW UPDATED PLANS TO ADDRESS THE LATEST
 ROUND OF COMMENTS; HOWEVER, SINCE NOT ALL THE PLANS ARE
 THE MOST RECENT PLANS, THE PLANS REMAIN INTERNALLY
 INCONSISTENT. ADDITIONALLY, THE ARCHITECTURAL PLANS
 SUBMITTED ON APRIL 6, 2023, DO NOT MATCH THE LANDSCAPE
 AND CIVIL PLANS SUBMITTED ON APRIL 6, 2023.
  
 THE KIMLEY-HORN CIVIL AND LANDSCAPE PLANS APPEAR TO
 MATCH THE ARCHITECTURAL PLANS SUBMITTED TO STAFF ON
 FEBRUARY 28, 2023. STAFF IDENTIFIED ONE COMMENT ON
 THESE PLANS THAT NEEDS TO BE ADDRESSED.
  
 HARDSCAPE
  
 1) UPDATED COMMENT: THANK YOU FOR PROVIDING THE SEATING
 CALCULATIONS FOR THE PUBLIC OPEN SPACE AREA ON SHEET
 L2.00. THERE IS A 21-FOOT 1-INCH LENGTH OF PLANTER
 SEATING IN THE WESTERN SECTION OF THE PUBLIC OPEN SPACE
 THAT DIRECTLY CONFLICTS WITH THE MICRO MOBILITY STATION
 LOCATION. THIS SEATING AREA MAY NOT BE COUNTED TOWARD
 MEETING THE SEATING REQUIREMENT AS IT WILL BE BLOCKED
 BY THE MICRO MOBILITY STATION. THE SEAT WALL MAY
 REMAIN, BUT IT MAY NOT COUNT TOWARD MEETING THE PUBLIC
 OPEN SPACE SEATING REQUIREMENT.
  
 LIGHTING
  
 2) THANK YOU FOR PROVIDING THE LIGHTING PLANS. ANA
 MARIA APONTE, DEPUTY DIRECTOR, COMMUNITY REDEVELOPMENT
 AGENCY IS VERIFYING THAT THE FIXTURES BEING USED COMPLY
 WITH THE DISCUSSIONS SHE HAD WITH YOUR TEAM. PLANNING
 HAS VERIFIED THAT THE LOCATIONS FOR THE NEW POLES DO
 NOT CONFLICT WITH THE PROPOSED TREES.
  
 THE NEXT SUBMITTAL SHALL INCLUDE THE CURRENT VERSIONS
 OF ALL OF THE ARCHITECTURAL PLANS. ALL OF THE
 ARCHITECTURAL PLANS SHALL BE INTERNALLY CONSISTENT AND
 COMPLY WITH CODE REQUIREMENTS AND THE APPROVED WAIVERS
 AND VARIANCES. PLEASE NOTE THAT ANY CHANGES THAT STAFF
 HAS NOT PREVIOUSLY REVIEWED TO THE PLANS SHALL BE
 CLOUDED AND PROVIDED IN A NARRATIVE. PLEASE NOTE THAT
 NEW CHANGES WILL DELAY THE REVIEW. ALL PLANS SUBMITTED
 FOR THE FORMAL SITE PLAN SHALL BE INTERNALLY
 CONSISTENT, TO INCLUDE ADDRESSING THE OUTSTANDING
 SEATING COMMENT.
  
  

Review Stop Z ZONING
Rev No 8 Status F Date 03-28-2023 Cont ID  
Sent By eschneid Date 03-28-2023 Time 09:49 Rev Time 2.00
Received By eschneid Date 03-24-2023 Time 10:47 Sent To  
Notes
2023-03-28 10:05:30CASE NO. PB 1895 FORMAL SITE PLAN
 NORTHWOOD COMMONS
 2501 BROADWAY
  
 - CONTACT ERIC SCHNEIDER @ (561) 822-1446,
 [email protected]
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE TWO (2) PAPER
 COPIES AND AN ELECTRONIC COPY IN .PDF FORMAT OF ALL
 PLANS. PLEASE NOTE THAT CHANGES ON THE RESUBMITTED
 PLANS OR THE SUBMITTAL OF INFORMATION/PLANS TO ADDRESS
 THE COMMENTS MAY RESULT IN ADDITIONAL COMMENTS.
  
 THE LEVEL III SPECIAL REVIEW WAS APPROVED, INCLUDING
 THE VARIANCES. THE ARCHITECTURAL, LANDSCAPE AND CIVIL
 PLANS, COLLECTIVELY, THE FORMAL SITE PLAN, HAS THE
 FOLLOWING ITEMS THAT NEED TO BE CORRECTED. PLEASE NOTE
 THAT THERE ARE CONDITIONS THAT WILL BE INCLUDED WITH
 THE FINAL APPROVAL LETTER.
  
 THE NEXT SUBMITTAL SHALL BE A FULL RESUBMITTAL WITH ALL
 THE CURRENT PLAN VERSIONS. ALL PLANS SHALL BE
 INTERNALLY CONSISTENT AND SUFFICIENTLY ADDRESS THE
 REMAINING COMMENTS SO THAT STAFF CAN APPROVE THE FORMAL
 SITE PLAN. PLEASE NOTE THAT ANY CHANGES TO THE PLANS
 THAT STAFF HAS NOT PREVIOUSLY REVIEWED MAY DELAY THE
 REVIEW.
  
 1) UPDATED COMMENT: SINCE THE APPROVAL OF THE LEVEL III
 SPECIAL REVIEW, STAFF WAS PROVIDED UPDATES TO THE
 ELEVATION DRAWINGS FOR BUILDINGS A THERE ARE CHANGES TO
 THE FENESTRATION:
  
 A. BUILDING A NEW PINEWOOD - THE ACTIVE USE AREA THAT
 IS PROVIDED ON THE FENESTRATION AREA CALCULATIONS TABLE
 ON SHEET A101.1B IS INCORRECT FOR BOTH SIDES OF NEW
 PINEWOOD. THE NEW VALUE OF 6,019 SQUARE FEET OF ACTIVE
 USE AREA SEEMS TO BE THE TOTAL FACADE AREA, NOT THE
 ACTIVE USE AREA. WHEN COMPARING THE SITE PLAN AND
 ELEVATIONS, THE ACTIVE USE AREA HAS MINIMALLY REDUCED
 FROM THE NOVEMBER 14, 2022 LEVEL III SET OF DRAWINGS.
 THE TABLE NEEDS TO REFLECT THE CORRECT ACTIVE USE ARE,
 SINCE THIS IS WHAT THE BASIS FOR THE AMOUNT OF
 FENESTRATION THAT IS REQUIRED. THE ELEVATION DRAWING
 FOR THE WEST SIDE OF NEW PINEWOOD SHOWS FENESTRATION
 ADDED FOR NON-ACTIVE USE AREAS, WHICH MAY NOT COUNT
 TOWARD MEETING THE MINIMUM FENESTRATION FOR REQUIREMENT
 ACTIVE-USE AREAS. NOTE: THE NOVEMBER 14, 2022 PLANS
 EXCEEDED THE MINIMUM FENESTRATION REQUIREMENT BY A
 SIGNIFICANT AMOUNT. INCORRECTLY SHOWING AN INCREASE IN
 THE PROVIDED ACTIVE USE AREA ERRONEOUSLY REQUIRES MORE
 FENESTRATION.
  
 B. BUILDING A PASEO (NORTH ELEVATION) - THE MINIMUM
 FENESTRATION IS 70% OF THE ACTIVE USE AREA. THE NEW
 PLANS PROVIDE 69% FENESTRATION, WHICH DOES NOT MEET THE
 MINIMUM AMOUNT OF FENESTRATION. ROUNDING UP IS NOT
 PERMITTED. BASED ON THE 4,297 SQUARE FEET OF ACTIVE USE
 AREA, AT LEAST 3,008 SQUARE FEET OF FENESTRATION IS
 REQUIRED. THIS COULD BE ACHIEVED BY ADDING FENESTRATION
 TO THE SOUTH SIDE OF LINER UNIT 13.
  
 2) UPDATED REPEAT COMMENT: THE DIMENSION LINES WERE NOT
 UPDATED TO REFLECT THE SETBACK DIMENSIONS FROM THE
 NORTHERN PROPERTY LINE TO THE WALL ON SHEET C1.50.
 SHEETS C1.51, C1.52 AND DETAIL C-C ON SHEET C2.09 WERE
 UPDATED. ALL PLANS MUST SHOW CONSISTENT INFORMATION.
  
 3) UPDATED COMMENT: THANK YOU FOR PROVIDING THE PLANS
 FOR THE PRESERVATION OF THE DOORWAY. THE CITY HISTORIC
 PRESERVATION PLANNER HAS REVIEWED THE SUBMITTED PLANS
 AND HAS APPROVED THE DESIGN WITH THE CONDITION THAT THE
 ACTUAL DOOR BE REMOVED. THE DOORWAY NEEDS TO REMAIN
 OPEN FOR PASS THROUGH. SHEET HP S-1.0B SHALL BE UPDATED
 TO REFLECT THE DOOR REMOVAL AS PART OF THE SITE PLAN
 PACKAGE RESUBMITTAL.
  
 HARDSCAPE
  
 4) UPDATED COMMENT: THE MOST RECENT CIVIL PLANS SHOW 13
 BICYCLE RACKS THROUGHOUT THE DEVELOPMENT SITE. SHEETS
 L.2.00 AND L2.11 THAT WERE SUBMITTED ON JANUARY 19,
 2023 LIST THAT THERE WILL BE 14 BICYCLE RACKS. THE
 CORRECT NUMBER OF INSTALLED RACKS MUST BE PROVIDED ON
 THESE SHEETS.
  
 5) REPEAT UPDATED COMMENT: BASED ON THE AMOUNT OF
 PROVIDED PUBLIC OPEN SPACE, 430 LINEAR FEET OF SEATING
 IS REQUIRED (TABLE ON SHEET L1.02). IT WAS STAFF'S
 UNDERSTANDING THAT THIS WAS BEING PROVIDED AS SEAT
 WALLS AROUND THE LANDSCAPE PLANTERS. THE UPDATED CIVIL
 SHEETS (C1.53 AND C1.54) SHOW WHAT APPEAR TO BE SEATING
 AREAS AROUND THE PLANTERS THAT ARE LOCATED WITHIN THE
 PUBLIC OPEN SPACE. NO LINEAR DIMENSIONS WERE PROVIDED
 ON THESE SHEETS SO THAT STAFF COULD VERIFY COMPLIANCE
 WITH THE MINIMUM 430 LINEAR FEET OF SEATING THAT IS
 REQUIRED. NO HARDSCAPE PLAN WAS SUBMITTED WITH THE MOST
 RECENT RESUBMITTAL, SO STAFF WAS UNABLE TO USE THE
 HARDSCAPE PLAN TO VERIFY COMPLIANCE AS STATED IN THE
 RESPONSE.
  
 6) IN ADDITION TO NO NEW HARDSCAPE PLAN BEING
 SUBMITTED, AN UPDATED LANDSCAPE PLAN REFLECTING THE
 CHANGES TO THE PARKING AREAS AND THE SEATING WAS ALSO
 NOT SUBMITTED.
  
 LIGHTING
  
 7) PROVIDE THE LIGHTING PLANS THAT COMPLY WITH THE
 DISCUSSIONS THAT HAVE BEEN HAD WITH ANA MARIA APONTE,
 DEPUTY DIRECTOR, COMMUNITY REDEVELOPMENT AGENCY.
  

Review Stop Z ZONING
Rev No 7 Status F Date 02-13-2023 Cont ID  
Sent By eschneid Date 02-13-2023 Time 16:08 Rev Time 2.00
Received By eschneid Date 02-07-2023 Time 16:50 Sent To  
Notes
2023-02-13 16:08:56CASE NO. PB 1895 FORMAL SITE PLAN
 NORTHWOOD COMMONS
 2501 BROADWAY
  
 - CONTACT ERIC SCHNEIDER @ (561) 822-1446,
 [email protected]
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF TWO
 (2) PAPER COPIES AND AN ELECTRONIC COPY IN .PDF FORMAT
 OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS
 TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL
 COMMENTS.
  
 THE LEVEL III SPECIAL REVIEW WAS APPROVED, INCLUDING
 THE VARIANCES. THE ARCHITECTURAL, LANDSCAPE AND CIVIL
 PLANS, COLLECTIVELY, THE FORMAL SITE PLAN, HAS THE
 FOLLOWING ITEMS THAT NEED TO BE CORRECTED. PLEASE NOTE
 THAT INCLUDED ARE THE CONDITIONS THAT WILL BE INCLUDED
 WITH THE FINAL APPROVAL LETTER. IF ANY OF THOSE ITEMS
 CAN BE ADDRESSED WITH THIS RESUBMITTAL (EXAMPLE
 TRANSPORTATION PLANNER CONDITIONS) STAFF WOULD PREFER
 TO SEE IT AT THIS TIME.
  
 1) UPDATED COMMENT: SINCE THE APPROVAL OF THE LEVEL III
 SITE PLAN REVIEW, STAFF WAS PROVIDED UPDATES TO THE
 ELEVATION DRAWINGS FOR BUILDINGS A AND C. STAFF HAS
 REVIEWED THE DRAWINGS AND NOTED THAT THERE ARE NO
 CHANGES TO THE PLANAR BREAKS; HOWEVER, THERE ARE
 CHANGES TO THE FENESTRATION:
  
 A. BUILDING A - FENESTRATION ALONG BROADWAY, 25TH AND
 THE PUBLIC OPEN SPACE COMPLY.
 B. BUILDING A - PROVIDE THE FENESTRATION DRAWINGS AND
 PERCENTAGES FOR NEW PINEWOOD (EAST AND WEST - 50%
 REQUIRED) AND THE PUBLIC PASEO (NORTH AND SOUTH - 70%
 REQUIRED). ***** NEW DRAWINGS WERE NOT PROVIDED. THE
 TABLE FOR THE PINEWOOD FENESTRATION WAS UPDATED, BUT
 SINCE THE PLANS ARE THE SAME, STAFF IS NOT SURE HOW
 THIS IS POSSIBLE.
 C. BUILDING C - FENESTRATION ALONG 24TH STREET COMPLIES
  
 *** PLEASE ENSURE THAT ALL DATA TABLES SHOW THE SAME
 ACCURATE VALUES ACROSS ALL PLAN SHEETS.
  
 2) UPDATED COMMENT: THANK YOU FOR UPDATING THE KIMLEY
 HORN BASE PLAN TO CORRECTLY SHOW THE BUILDING A
 NORTHERN BUILDING WALL TO MATCH WHAT IS SHOWN ON THE
 LATEST ARCHITECTURAL DRAWINGS. HOWEVER, THE DIMENSION
 LINES WERE NOT UPDATED TO REFLECT THE SETBACK
 DIMENSIONS TO THE WALL (SHEETS C1.50, C1.51 AND C1.52).
 THE DIMENSION LINES MUST SHOW THE SETBACK, NOT A RANDOM
 SPOT IN THE SIDEWALK. SECTION DETAIL C-C ON SHEET C2.09
 WAS NOT UPDATED TO REFLECT THE CORRECT SETBACK. PLEASE
 NOTE THAT THERE IS AN FDC AND BACKFLOW THAT WILL NEED
 TO BE ADJUSTED SO THEY ARE NOT LOCATED IN THE MIDDLE OF
 THE NEW, WIDER SIDEWALK.
  
 3) UPDATED COMMENT: THE HISTORIC PRESERVATION FINAL
 ORDER REQUIRES THAT THE DOORWAY SECTION OF THE BUILDING
 LOCATED AT 550 NORTHWOOD ROAD BE PRESERVED IN PLACE.
 ***** THE ARCHITECTURAL PLANS MUST INCLUDE DETAILS NOT
 ONLY OF HOW THE DOORWAY IS TO BE PRESERVED DURING THE
 DEMOLITION OF THE REMAINDER OF THE BUILDING, BUT ALSO
 THE DETAILS OF THE PRESERVED DOORWAY. THE DETAILS SHALL
 INCLUDE DIMENSIONS FOR THE HEIGHT, WIDTH AND DEPTH OF
 THE DOORWAY PORTION OF BE PRESERVED. THE HISTORIC
 PRESERVATION PLANNER IS REQUIRING THIS TO BE SHOWN IN
 PLAN AND IN ELEVATION ON THE ARCHITECTURAL PLANS AS
 PART OF THE SITE PLAN APPROVAL.
  
 HARDSCAPE
  
 4) UPDATED REPEAT COMMENT: THE BOLLARDS MAY NOT BE
 LOCATED AT THE MIDDLE OF THE PARKING SPACE AS THEY WILL
 OBSTRUCT DOOR OPENINGS, REGARDLESS OF THE FACT THAT
 THEY HAVE BEEN MOVED 2.5 FEET FROM THE EDGE OF THE
 SPACE. THE BOLLARDS SHALL BE PLACES SIMILAR TO HOW THE
 CITY HAS INSTALLED BOLLARDS ALONG CLEMATIS STREET,
 CLOSER TO THE ENDS OF THE PARKING SPACES.
  
 5) THANK YOU FOR PROVIDING THE DIMENSION BOXES AROUND
 THE BICYCLE PARKING. THE TWO BICYCLE PARKING SPACES AT
 THE NORTH END OF PINEWOOD DO NOW SHOW THAT THE REQUIRED
 60-INCH CLEAR PATH REQUIRED BY THE NMUD REGULATIONS
 WILL BE MAINTAINED WHILE THE BICYCLE RACK IS IN USE AND
 SHALL BE RELOCATED. THE ONE ON THE EAST SIDE OF
 PINEWOOD COULD BE SHIFTED TO THE SOUTH END OF THE
 LANDSCAPE BED AND BE INSTALLED PERPENDICULAR TO THE
 STREET. THE BICYCLE PARKING SPACE THAT HAS THE
 DIMENSIONED BOX, SOUTH OF THE PASEO, ALSO DOES NOT HAVE
 THE 60-INCH CLEAR AREA. THIS COULD ALSO BE SHIFTED
 ADJACENT TO THE PLANTER.
  
 6) BASED ON THE AMOUNT OF PROVIDED PUBLIC OPEN SPACE,
 430 LINEAR FEET OF SEATING IS REQUIRED (TABLE ON SHEET
 L1.02). IT WAS STAFF'S UNDERSTANDING THAT THIS WAS
 BEING PROVIDED AS SEAT WALLS AROUND THE LANDSCAPE
 PLANTERS. STAFF HAD MEASURED THESE AREAS AND THE 430
 FEET WAS EXCEEDED, HOWEVER, WHEN COMPARING DIFFERENT
 PLANS SOME OF THESE AREAS NO LONGER LOOK TO HAVE
 SEATING AREAS. THE PROVISION OF THE BENCHES AS SEATING
 ONLY PROVIDES 144 LINEAR FEET OF SEATING, WHICH DOES
 NOT MEET THE MINIMUM REQUIREMENTS. PLEASE CLARIFY AND
 INCLUDE DIMENSIONS FOR THE SEATING AREA THAT ARE BEING
 CLAIMED TO COMPLY WITH THE SEATING REQUIREMENT. NOTE:
 THE LEG ROOM FOR ONE BENCH SEEMS TO BE OBSTRUCTED BY A
 BICYCLE RACK AND ANOTHER BY A BOLLARD. PLEASE REVIEW.
  
 PARKING
  
 7) WHILE REVIEWING THE HARDSCAPE DIMENSIONS, STAFF
 NOTED THAT THERE ARE TWO PARKING SPACES ON THE WEST
 SIDE OF PINEWOOD THAT DO NOT MEET THE MINIMUM 22-FOOT
 CURB LENGTH FOR PARALLEL PARKING SPACES. THESE SPACES
 ARE APPROXIMATELY 16.5 FEET IN LENGTH AND THUS DO NOT
 MEET THE CODE MINIMUM. THIS WAS NOT PREVIOUSLY NOTED
 SINCE THE ONE SAMPLE SPACE DIMENSION ON SHEET A103.0 IS
 SHOWN FOR A CONFORMING 22-FOOT LONG SPACE. THIS IS A
 PROBLEM SINCE THE SITE IS NOW TWO PARKING SPACES SHORT
 OF MEETING CODE.
  
 PUBLIC WORKS - SANITATION.
  
 8) UPDATED COMMENT: THANK YOU FOR PROVIDING THE
 NOTATIONS REGARDING THE SOLID WASTE CONTAINER SIZE/TYPE
 AND THE HEIGHT CLEARANCE OVER THE LOADING ZONE WHERE
 THE SOLID WASTE CONTAINER(S) GET SERVICED AND THE BULK
 WASTE GETS PICKED UP. ***** THE PLANS SHOW THAT THE
 SOLID WASTE FACILITY WILL OVERLAP WITH THE REQUIRED
 LOADING ZONE, WHICH IS NOT PERMITTED.
  
 CONDITION: COMPLIANCE WITH THE WASTE MANAGEMENT LETTER
 DATED OCTOBER 25, 2022, WILL BE INCLUDED AS A CONDITION
 OF APPROVAL.
  
 POTENTIAL DRAFT CONDITIONS
  
 1) PRIOR TO THE ISSUANCE OF BUILDING PERMITS FOR
 VERTICAL CONSTRUCTION OF BUILDINGS A OR B, THE
 SUBMITTED PLAT NEEDS TO BE RECORDED AND THE
 RIGHTS-OF-WAY WITHIN THE SITE NEED TO BE ABANDONED.
  
 2) ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE DOES
 NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL OPENINGS TO
 MEET THE DEFINITION OF AN OPEN PARKING GARAGE, IT WILL
 BE CONSIDERED AN ENCLOSED PARKING GARAGE AND MUST HAVE
 EXHAUST SYSTEMS. THE EXHAUST SYSTEMS SHALL BE DESIGNED
 TO MINIMIZE NOISE LEVELS USING INLINE FAN SILENCERS OR
 OTHER APPROVED METHODS.
  
 3) IF AT TIME OF CONSTRUCTION/PARKING SPACE STRIPING
 ADDITIONAL SPACES ARE IDENTIFIED AS LESS THAN ONE FOOT
 FROM A WALL, THE SPACES WILL ALSO NEED TO BE MARKED AS
 COMPACT WITH AN AMENDMENT TO THE SITE PLAN AT THAT
 TIME.
  
 4) CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND
 CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF
 CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL
 NEIGHBORING PROPERTIES.
  
 5) PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER
 AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY,
 INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE
 CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF
 NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION
 THAT MAY AFFECT THE USE OF THEIR PROPERTY.
  
 6) PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  
 7) THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
  
 8)THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF
 WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A
 SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  
 9) THERE ARE UTILITY EASEMENTS SHOWN IN LOCATIONS IN
 CONFLICT WITH REQUIRED TREES. THIS OCCURS AT THE
 NORTHWEST CORNER OF THE SITE ALONG THE FEC RR, ALONG
 23RD STREET, AND THE WEST SIDE OF BROADWAY EXTENSION.
 ANY UTILITIES INSTALLED IN THIS AREA MUST BE AT LEAST
 36 INCHES BELOW GRADE OR OTHERWISE LOCATED TO AVOID THE
 REQUIRED TREE ROOT SYSTEMS.
  
 10) PRIOR TO THE FIRST CERTIFICATE OF OCCUPANCY FOR THE
 SITE:
  
 A. ACCESS AND MAINTENANCE EASEMENTS, APPROVED BY THE
 CITY ATTORNEY'S OFFICE, ARE REQUIRED TO BE RECORDED FOR
 ANY PORTIONS OF SIDEWALKS, ROADWAYS, PARKING SPACES AND
 STREET LIGHTING LOCATED WITHIN THE DEVELOPMENT SITE.
 B. AN AERIAL EASEMENT, APPROVED BY THE CITY ATTORNEY'S
 OFFICE, IS REQUIRED TO BE RECORDED.
  
 11) IN THE EVENT THAT THE FLORIDA DEPARTMENT OF
 TRANSPORTATION (FDOT) DOES NOT ISSUE A PERMIT FOR THE
 IMPROVEMENTS, TO INCLUDE THE LANDSCAPE, SHOWN WITHIN
 THE BROADWAY ROW, THEN CODE COMPLIANT IMPROVEMENTS MUST
 BE INSTALLED ON THE SITE AFTER THE APPROVAL OF A SITE
 PLAN AMENDMENT.
  
 12) THE HARDSCAPE ITEMS WITHIN THE FDOT ROW REQUIRE
 PERMIT APPROVAL BY FDOT. THIS NEEDS TO BE PROVIDED.
  
 STORMWATER
  
 CONDITION: REVIEW THE COMMENTS MADE BY THE CITY
 STORMWATER ENGINEER AS THERE ARE A NUMBER OF ITEMS THAT
 NEED TO BE REFLECTED ON THE ENGINEERING PERMIT
 SUBMITTAL. PLEASE ENSURE THAT ANY CHANGES MADE TO THE
 ENGINEERING PLANS THAT AFFECT ABOVE GROUND CONDITIONS
 ARE PROVIDED TO PLANNING AS WELL.
  
 TRANSPORTATION PLANNER CONDITIONS
  
 1) PROVIDE A CLEAN, DEDICATED TRANSPORTATION SITE PLAN
 DEPICTING ALL RELATED ROADWAY AND TRANSPORTATION
 FEATURES, FULLY DIMENSIONED AND SHOWCASING CURB DETAILS
 ON THE OPPOSITE SIDE OF THE ROAD FRONTING THE PROPOSED
 DEVELOPMENT. PLEASE KEEP IN MIND THAT THIS COMMENT WAS
 PROVIDED AT THE VERY FIRST PPRC REVIEW AND WAS NEVER
 COMPLETELY FULFILLED
 2) PROVIDE A REVISED AUTOTURN ANALYSIS SHOWCASING
 SERVICE VEHICLES ACCESSING/EXITING THE FACILITY,
 MANEUVERING AT EACH POSSIBLE LOADING OR SANITATION
 ZONE(S), WITH BOTH DYNAMIC AND WHEEL PATHS HIGHLIGHTED
 IN SEPARATE COLORS
 3) PROVIDE A LIST OF ON-GOING ITEMS UNDER DISCUSSION OR
 REVIEW WITH COUNTY AND FDOT. OBTAIN COUNTY AND/OR FDOT
 APPROVAL PERTAINING THE PORTION OF THE PROPOSED
 DEVELOPMENT IMPACTING THEIR RIGHT OF WAY
 4) INSTALL AND SHOW SHARROW MARKINGS ALONG 23RD ST AND
 PINEWOOD AVE
 5) 25TH ST ROADWAY DESIGN SHOULD ACCOMMODATE THE
 PLANNED SEPARATED AND ELEVATED BICYCLE LANES FROM
 AUSTRALIAN TO BROADWAY. PLEASE REFER TO THE CITY
 BICYCLE MASTERPLAN FOR TYPICAL SECTION(S) AND UPDATE
 THE SITE PLANS ACCORDINGLY. NOTE: CITY MAY NOT REQUIRE
 THE DEVELOPER TO IMPLEMENT SUCH FEATURE ALONG SITE
 FRONTAGE; HOWEVER, ROW MUST BE PRESERVED AND PROVIDED
 TO ACCOMMODATE ITS FUTURE IMPLEMENTATION
 6) THE PROPOSED PINEWOOD AVENUE RE-ALIGNMENT IS NOT
 CONDUCIVE TO A SAFE VEHICULAR STRAIGHT-THROUGH MOVEMENT
 ACROSS THE 25TH AND 23RD INTERSECTIONS. SUCH MOVEMENT
 SHOULD BE EITHER FORBIDDEN OR FACILITATED BY SIGNAGE,
 STRIPING AND ROADWAY FEATURES SUCH AS FLEXIBLE POLES,
 MIDDLE RAISED ISLANDS AND CHANNELIZATION. PLEASE REVISE
 THE SITE PLANS ACCORDINGLY
 7) INSTALL AND SHOWCASE STOP BARS AND SIGNS ON EACH
 GARAGE LEVEL. IT IS RECOMMENDED TO TREAT THE NORTHERN
 AND SOUTHERN EAST-WEST DRIVE AISLES AS THE MAIN ONES,
 WHILE THE NORTH-SOUTH AS MINOR
 8) DIRECTIONAL ARROW PAVEMENT MARKINGS ARE MISSING.
 PLEASE INSERT THEM IN THE TRANSPORTATION SITE PLAN
 THROUGHOUT WERE NEEDED (E.G. RIGHT ARROW FOR THE
 SOUTHBOUND MOVEMENT, LEFT ARROW FOR THE EASTBOUND
 MOVEMENT AT THE 23RD AND PINEWOOD INTERSECTION)
  
  
  

Review Stop Z ZONING
Rev No 6 Status F Date 01-09-2023 Cont ID  
Sent By eschneid Date 01-06-2023 Time 16:59 Rev Time 2.00
Received By eschneid Date 10-25-2022 Time 10:31 Sent To  
Notes
2023-01-06 17:00:12CASE NO. PB 1895 FORMAL SITE PLAN
 NORTHWOOD COMMONS
 2501 BROADWAY
  
 - CONTACT ERIC SCHNEIDER @ (561) 822-1446,
 [email protected]
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF TWO
 (2) PAPER COPIES AND AN ELECTRONIC COPY IN .PDF FORMAT
 OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS
 TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL
 COMMENTS.
  
 THE LEVEL III SPECIAL REVIEW WAS APPROVED, INCLUDING
 THE VARIANCES. THE ARCHITECTURAL, LANDSCAPE AND CIVIL
 PLANS, COLLECTIVELY, THE FORMAL SITE PLAN, HAS THE
 FOLLOWING ITEMS THAT NEED TO BE CORRECTED. PLEASE NOTE
 THAT INCLUDED ARE THE CONDITIONS THAT WILL BE INCLUDED
 WITH THE FINAL APPROVAL LETTER. IF ANY OF THOSE ITEMS
 CAN BE ADDRESSED WITH THIS RESUBMITTAL (EXAMPLE
 TRANSPORTATION PLANNER CONDITIONS) STAFF WOULD PREFER
 TO SEE IT AT THIS TIME.
  
 1) THERE IS AN OUTSTANDING FEE BALANCE OF $2,568. THIS
 NEEDS TO BE PAID PRIOR TO THE ISSUANCE OF THE FORMAL
 SITE PLAN APPROVAL. IT IS STAFF'S UNDERSTANDING THAT
 THIS SOON TO BE PAID.
  
 2) SINCE THE APPROVAL OF THE LEVEL III SITE PLAN
 REVIEW, STAFF WAS PROVIDED UPDATES TO THE ELEVATION
 DRAWINGS FOR BUILDINGS A AND C. STAFF HAS REVIEWED THE
 DRAWINGS AND NOTED THAT THERE ARE NO CHANGES TO THE
 PLANAR BREAKS; HOWEVER, THERE ARE CHANGES TO THE
 FENESTRATION:
  
 A. BUILDING A - FENESTRATION ALONG BROADWAY, 25TH AND
 THE PUBLIC OPEN SPACE COMPLY.
 B. BUILDING A - PROVIDE THE FENESTRATION DRAWINGS AND
 PERCENTAGES FOR NEW PINEWOOD (EAST AND WEST - 50%
 REQUIRED) AND THE PUBLIC PASEO (NORTH AND SOUTH - 70%
 REQUIRED).
 C. BUILDING C - FENESTRATION ALONG 24TH STREET COMPLIES
  
 *** PLEASE ENSURE THAT ALL DATA TABLES SHOW THE SAME
 ACCURATE VALUES ACROSS ALL PLAN SHEETS.
  
 3) THE BASE PLANS USED BY KIMLEY HORN WERE NOT UPDATED
 TO SHOW THE NEW NORTHERN BUILDING WALL OF BUILDING A
 THAT IS SHOWN ON THE LATEST ARCHITECTURAL DRAWINGS. THE
 NEW WALL IS LOCATED 1.3 FEET FURTHER SOUTH THAN THE
 CURRENT KIMLEY HORN PLANS SHOW. THIS OCCURS ON THE
 PLANS SUBMITTED FOR THE ENGINEERING REVIEW AS WELL AS
 THE LATEST PLANNING FORMAL SITE PLAN. THESE PLANS MUST
 BE CORRECTED TO MATCH THE ARCHITECTURAL PLANS. PLEASE
 NOTE THAT THERE IS AN FDC AND BACKFLOW THAT WILL NEED
 TO BE ADJUSTED SO THEY ARE NOT LOCATED IN THE MIDDLE OF
 THE NEW, WIDER SIDEWALK.
  
 4) THE HISTORIC PRESERVATION FINAL ORDER REQUIRES THAT
 THE DOORWAY SECTION OF THE BUILDING LOCATED AT 550
 NORTHWOOD ROAD BE PRESERVED IN PLACE. THE DEMOLITION
 PLAN SHOWS THE DOORWAY BEING REMOVED, WHICH IS NOT
 PERMITTED. THE DEMOLITION PLANS MUST CLEARLY CALL OUT
 THE PRESERVATION OF THE DOORWAY AND INCLUDE DETAILS NOT
 ONLY OF HOW THE DOORWAY IS TO BE PRESERVED DURING THE
 DEMOLITION OF THE REMAINDER OF THE BUILDING, BUT ALSO
 THE DETAILS OF THE PRESERVED DOORWAY. THE DETAILS SHALL
 INCLUDE DIMENSIONS FOR THE HEIGHT, WIDTH AND DEPTH OF
 THE DOORWAY PORTION OF BE PRESERVED. THIS SHALL BE
 SHOWN IN PLAN AND IN ELEVATION ON THE ARCHITECTURAL AND
 CIVIL PLANS.
 LANDSCAPE
  
 5) REVIEW AND ADDRESS THE COMMENTS THAT WERE ENTERED BY
 THE CITY LANDSCAPE PLANNER ON JANUARY 6, 2023.
  
 6) A BACKFLOW METER ALONG 23RD STREET (AT MATCH LINE
 BETWEEN SHEETS C2.03 AND C2.04) CONFLICTS WITH A
 REQUIRED TREE AND NEEDS TO BE SHIFTED. THIS SHALL BE
 CORRECTLY SHOWN ON ALL PLANS.
  
 7) ROOT BARRIERS NEED TO BE SHOWN ON THE LANDSCAPE
 PLANS WHERE TREES AND PALMS ARE IN CLOSE PROXIMITY TO
 STORM, SEWER AND WATER LINES, BOTH PUBLIC AND PRIVATE.
 THIS ONLY OCCURS IN A FEW LOCATIONS.
  
 HARDSCAPE
  
 8) THE FINAL LOCATION OF THE NEW CROSSWALK ACROSS 23RD
 STREET AT THE BROADWAY EXTENSION MAY NOT ANGLE ACROSS
 23RD STREET AS SHOWN. IT NEEDS TO BE RELOCATED TO THE
 WEST SIDE OF THE BROADWAY EXTENSION AND BE
 PERPENDICULAR TO THE SIDEWALK. THE OBSOLETE CURB CUT ON
 THE SOUTH SIDE OF 23RD STREET (IN FRONT OF THE CRA
 OWNED PARCEL) WILL NEED TO BE REMOVED TO FACILITATE A
 SAFE CROSSING LOCATION.
  
 9) THE HARDSCAPE AND CONTROL PLANS NEED TO SHOW THE
 BOX, WITH DIMENSIONS, FOR THE BICYCLE RACK OFFSETS ON
 THE PLANS, NOT JUST ON THE DETAIL PAGE. SCALING THE
 PLANS SHOWS THE OFFSETS NOT MET IN SOME INSTANCES.
  
 10) BOLLARDS MAY NOT BE LOCATED AT THE MIDDLE OF THE
 PARKING SPACE AS THEY WILL OBSTRUCT DOOR OPENINGS.
  
 11) BICYCLE RACKS MAY NOT BE ADJACENT TO PARKING SPACES
 (ONE AT NORTH END OF NEW PINEWOOD).
  
 12) ALL ABOVEGROUND HARDSCAPE FEATURES NEED TO BE SHOWN
 ON THE CONTROL PLAN, WITH DIMENSIONS.
  
 STORMWATER
  
 13) REVIEW THE COMMENTS MADE BY THE CITY STORMWATER
 ENGINEER AS THERE ARE A NUMBER OF ITEMS THAT NEED TO BE
 REFLECTED ON THE ENGINEERING PERMIT SUBMITTAL. PLEASE
 ENSURE THAT ANY CHANGES MADE TO THE ENGINEERING PLANS
 THAT AFFECT ABOVE GROUND CONDITIONS ARE PROVIDED TO
 PLANNING AS WELL.
  
 PUBLIC WORKS - SANITATION.
  
 14) PROVIDE A NOTE ON THE PLAN THAT INCLUDES THE
 CONTAINER SIZE/TYPE FOR THE SOLID WASTE.
  
 15) PROVIDE THE HEIGHT CLEARANCE OVER THE LOADING ZONE
 WHERE THE SOLID WASTE CONTAINER(S) GET SERVICED AND THE
 BULK WASTE GETS PICKED UP.
  
 THE INFORMATION PROVIDED IN COMMENT #S 14 AND 15 ABOVE
 SHALL COMPLY WITH THE INFORMATION PROVIDED IN THE WASTE
 MANAGEMENT LETTER DATED OCTOBER 25, 2022. THE LETTER
 WILL BE INCLUDED AS A CONDITION OF APPROVAL.
  
 POTENTIAL DRAFT CONDITIONS
  
 1) PRIOR TO THE ISSUANCE OF BUILDING PERMITS FOR
 VERTICAL CONSTRUCTION OF BUILDINGS A OR B, THE
 SUBMITTED PLAT NEEDS TO BE RECORDED AND THE
 RIGHTS-OF-WAY WITHIN THE SITE NEED TO BE ABANDONED.
  
 2) ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE DOES
 NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL OPENINGS TO
 MEET THE DEFINITION OF AN OPEN PARKING GARAGE, IT WILL
 BE CONSIDERED AN ENCLOSED PARKING GARAGE AND MUST HAVE
 EXHAUST SYSTEMS. THE EXHAUST SYSTEMS SHALL BE DESIGNED
 TO MINIMIZE NOISE LEVELS USING INLINE FAN SILENCERS OR
 OTHER APPROVED METHODS.
  
 3) IF AT TIME OF CONSTRUCTION/PARKING SPACE STRIPING
 ADDITIONAL SPACES ARE IDENTIFIED AS LESS THAN ONE FOOT
 FROM A WALL, THE SPACES WILL ALSO NEED TO BE MARKED AS
 COMPACT WITH AN AMENDMENT TO THE SITE PLAN AT THAT
 TIME.
  
 4) CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND
 CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF
 CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL
 NEIGHBORING PROPERTIES.
  
 5) PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER
 AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY,
 INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE
 CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF
 NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION
 THAT MAY AFFECT THE USE OF THEIR PROPERTY.
  
 6) PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  
 7) THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
  
 8)THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF
 WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A
 SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  
 9) THERE ARE UTILITY EASEMENTS SHOWN IN LOCATIONS IN
 CONFLICT WITH REQUIRED TREES. THIS OCCURS AT THE
 NORTHWEST CORNER OF THE SITE ALONG THE FEC RR, ALONG
 23RD STREET, AND THE WEST SIDE OF BROADWAY EXTENSION.
 ANY UTILITIES INSTALLED IN THIS AREA MUST BE AT LEAST
 36 INCHES BELOW GRADE OR OTHERWISE LOCATED TO AVOID THE
 REQUIRED TREE ROOT SYSTEMS.
  
 10) PRIOR TO THE FIRST CERTIFICATE OF OCCUPANCY FOR THE
 SITE:
  
 A. ACCESS AND MAINTENANCE EASEMENTS, APPROVED BY THE
 CITY ATTORNEY'S OFFICE, ARE REQUIRED TO BE RECORDED FOR
 ANY PORTIONS OF SIDEWALKS, ROADWAYS, PARKING SPACES AND
 STREET LIGHTING LOCATED WITHIN THE DEVELOPMENT SITE.
 B. AN AERIAL EASEMENT, APPROVED BY THE CITY ATTORNEY'S
 OFFICE, IS REQUIRED TO BE RECORDED.
  
 11) IN THE EVENT THAT THE FLORIDA DEPARTMENT OF
 TRANSPORTATION (FDOT) DOES NOT ISSUE A PERMIT FOR THE
 IMPROVEMENTS, TO INCLUDE THE LANDSCAPE, SHOWN WITHIN
 THE BROADWAY ROW, THEN CODE COMPLIANT IMPROVEMENTS MUST
 BE INSTALLED ON THE SITE AFTER THE APPROVAL OF A SITE
 PLAN AMENDMENT.
  
 12) THE HARDSCAPE ITEMS WITHIN THE FDOT ROW REQUIRE
 PERMIT APPROVAL BY FDOT. THIS NEEDS TO BE PROVIDED.
  
 TRANSPORTATION PLANNER CONDITIONS
  
 1) PROVIDE A CLEAN, DEDICATED TRANSPORTATION SITE PLAN
 DEPICTING ALL RELATED ROADWAY AND TRANSPORTATION
 FEATURES, FULLY DIMENSIONED AND SHOWCASING CURB DETAILS
 ON THE OPPOSITE SIDE OF THE ROAD FRONTING THE PROPOSED
 DEVELOPMENT. PLEASE KEEP IN MIND THAT THIS COMMENT WAS
 PROVIDED AT THE VERY FIRST PPRC REVIEW AND WAS NEVER
 COMPLETELY FULFILLED
 2) PROVIDE A REVISED AUTOTURN ANALYSIS SHOWCASING
 SERVICE VEHICLES ACCESSING/EXITING THE FACILITY,
 MANEUVERING AT EACH POSSIBLE LOADING OR SANITATION
 ZONE(S), WITH BOTH DYNAMIC AND WHEEL PATHS HIGHLIGHTED
 IN SEPARATE COLORS
 3) PROVIDE A LIST OF ON-GOING ITEMS UNDER DISCUSSION OR
 REVIEW WITH COUNTY AND FDOT. OBTAIN COUNTY AND/OR FDOT
 APPROVAL PERTAINING THE PORTION OF THE PROPOSED
 DEVELOPMENT IMPACTING THEIR RIGHT OF WAY
 4) INSTALL AND SHOW SHARROW MARKINGS ALONG 23RD ST AND
 PINEWOOD AVE
 5) 25TH ST ROADWAY DESIGN SHOULD ACCOMMODATE THE
 PLANNED SEPARATED AND ELEVATED BICYCLE LANES FROM
 AUSTRALIAN TO BROADWAY. PLEASE REFER TO THE CITY
 BICYCLE MASTERPLAN FOR TYPICAL SECTION(S) AND UPDATE
 THE SITE PLANS ACCORDINGLY. NOTE: CITY MAY NOT REQUIRE
 THE DEVELOPER TO IMPLEMENT SUCH FEATURE ALONG SITE
 FRONTAGE; HOWEVER, ROW MUST BE PRESERVED AND PROVIDED
 TO ACCOMMODATE ITS FUTURE IMPLEMENTATION
 6) THE PROPOSED PINEWOOD AVENUE RE-ALIGNMENT IS NOT
 CONDUCIVE TO A SAFE VEHICULAR STRAIGHT-THROUGH MOVEMENT
 ACROSS THE 25TH AND 23RD INTERSECTIONS. SUCH MOVEMENT
 SHOULD BE EITHER FORBIDDEN OR FACILITATED BY SIGNAGE,
 STRIPING AND ROADWAY FEATURES SUCH AS FLEXIBLE POLES,
 MIDDLE RAISED ISLANDS AND CHANNELIZATION. PLEASE REVISE
 THE SITE PLANS ACCORDINGLY
 7) INSTALL AND SHOWCASE STOP BARS AND SIGNS ON EACH
 GARAGE LEVEL. IT IS RECOMMENDED TO TREAT THE NORTHERN
 AND SOUTHERN EAST-WEST DRIVE AISLES AS THE MAIN ONES,
 WHILE THE NORTH-SOUTH AS MINOR
 8) DIRECTIONAL ARROW PAVEMENT MARKINGS ARE MISSING.
 PLEASE INSERT THEM IN THE TRANSPORTATION SITE PLAN
 THROUGHOUT WERE NEEDED (E.G. RIGHT ARROW FOR THE
 SOUTHBOUND MOVEMENT, LEFT ARROW FOR THE EASTBOUND
 MOVEMENT AT THE 23RD AND PINEWOOD INTERSECTION)
  
  
  

Review Stop Z ZONING
Rev No 5 Status F Date 10-13-2022 Cont ID  
Sent By eschneid Date 10-13-2022 Time 17:05 Rev Time 16.00
Received By eschneid Date 10-04-2022 Time 12:17 Sent To  
Notes
2022-10-13 17:06:05CASE NO. 1895 - SEPTEMBER 21, 2022 RESUBMITTAL
 NORTHWOOD COMMONS - NMUD ANCHOR SITE
 BROADWAY & 24TH STREET
  
 - CONTACT ERIC SCHNEIDER @ (561) 822-1446,
 [email protected]
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE THREE (3) PAPER
 COPIES AND AN ELECTRONIC COPY IN .PDF AND .PNG FORMAT
 OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS
 TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL
 COMMENTS.
  
 - ONCE THE COMMENTS ARE RESUBMITTED AND DEEMED
 SUFFICIENTLY ADDRESSED, THE CASE WILL BE SCHEDULED FOR
 THE NEXT AVAILABLE PLANNING BOARD MEETING.
  
 - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT
 RECEIVED A RESPONSE TO THE COMMENTS WITHIN 60 DAYS FROM
 THE DATE OF THESE COMMENTS (BY DECEMBER 12, 2022), THE
 PLANNING DIVISION MAY NOTIFY THE APPLICANT THAT THE
 CASE IS CONSIDERED WITHDRAWN. ANY FURTHER ACTION SHALL
 REQUIRE A NEW DEVELOPMENT APPLICATION.
  
 - PLEASE NOTE THAT PREVIOUSLY ISSUED COMMENTS CONTINUE
 WERE NOT ADDRESSED, SO THE APPLICANT IS ASSESSED A
 RESUBMITTAL FEE. SUCH FEE WILL BE 20% OF THE ORIGINAL
 APPLICATION FEE ($600).
  
 - PUBLIC HEARING NOTIFICATION SIGNAGE SHALL BE POSTED
 IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION
 94-39(I)(5) OF THE ZONING AND LAND DEVELOPMENT
 REGULATIONS.
  
 THIS APPLICATION WILL BE REVIEWED BY THE PLANNING BOARD
 AS A SPECIAL REVIEW, WHICH INCLUDES THEIR ABILITY TO
 GRANT WAIVERS AND VARIANCES. PRIOR TO SCHEDULING A
 HEARING BEFORE THE PLANNING BOARD AN UPDATED
 JUSTIFICATION STATEMENT MUST BE PROVIDE FOR EACH WAIVER
 AND VARIANCE REQUESTED/REQUIRED. ONCE THE FINAL NUMBER
 OF VARIANCES/WAIVERS IS DETERMINED, THE FEES WILL BE
 ADJUSTED BASED ON WHAT HAS BEEN PAID TO DATE VS WHAT IS
 STILL OWED. STAFF ANTICIPATES THAT BASED ON THE NUMBER
 OF VARIANCES/WAIVERS IDENTIFIED THERE WILL BE
 ADDITIONAL MONEY OWED TO THE CITY.
  
 1) UPDATED COMMENT: PROVIDE A COPY OF THE TRAFFIC
 IMPACT STUDY, DATED AUGUST 24, 2022, THAT IS REFERENCED
 IN THE TPS LETTER ISSUED BY PBC ENGINEERING ON
 SEPTEMBER 12, 2022. THE LETTER HAS SCALED BACK THE
 RECOMMENDED CONDITIONS, SPECIFICALLY THE LEFT TURN ON
 25TH STREET, THAT WERE IN THE PREVIOUS LETTER AND THE
 PRIOR TRAFFIC IMPACT ANALYSIS. PLEASE EXPLAIN WHAT
 CHANGED. STAFF HAS ALSO NOTED THAT THE PROJECT HAS
 SCALED BACK FROM WHAT IS APPROVED ON THE TPS LETTER -
 TRAFFIC PERFORMANCE STANDARDS APPROVAL LETTER FROM THE
 PALM BEACH COUNTY TRAFFIC DIVISION 66,200 SF RETAIL AND
 382 DU VS ACTUAL 64,200 SF & 381 DU.
  
 2) UPDATED COMMENT: THANK YOU FOR SHOWING THE
 RECONFIGURATION OF 23RD STREET TO TWO-WAY WEST OF THE
 BROADWAY EXTENSION. PLEASE CHECK THE LOCATION OF THE
 NEW CROSSWALK OF 23RD STREET ON THE EAST END OF THE
 PROJECT. WHEN COMPARING THE PLANS TO THE AERIAL, THE
 CROSSWALK IS DIRECTLY INTO THE MIDDLE OF THE DRIVEWAY
 APRON FOR THE SINGLE-FAMILY HOUSE ON THE SOUTH SIDE OF
 23RD STREET, WHICH IS NOT PERMITTED.
  
 3) REPEAT COMMENT: PROVIDE A PREDETERMINATION LETTER
 FROM FDOT FOR THE IMPROVEMENTS WITHIN THE FDOT
 RIGHTS-OF-WAY OF BROADWAY AND 24TH AND 25TH STREETS
 ADJACENT TO THE PROJECT. *** THIS IS REQUIRED PRIOR TO
 SCHEDULING A PLANNING BOARD HEARING.
  
 4) REPEAT COMMENT: THE UNIT COUNT HAS INCREASED, SO AN
 UPDATED SCAD IS REQUIRED.
  
 5) BUILDING C: THE CIVIL PLANS INDICATE THAT THERE WILL
 BE AN ACCESS AND UTILITY EASEMENT WHERE THE CURRENT
 ALLEY EXISTS. THIS HAS NEVER BEEN DISCUSSED AS BEING
 ABANDONED. THIS IS ALSO NOT REFLECTED ON THE OTHER
 DISCIPLINE'S PLANS.
  
 6) UPDATED COMMENT: ELEMENTS OF THE NORTHEAST CORNER OF
 BUILDING B ENCROACHES INTO THE REQUIRED 10-FOOT PRIMARY
 A SETBACK FROM BROADWAY. THIS NEEDS TO BE CORRECTED OR
 A VARIANCE REQUESTED. SHEET A301 STILL SHOWS THE CORNER
 OF THE BUILDING ON THE 1ST FLOOR ENCROACHING. PLEASE
 CLARIFY.
  
 7) THE SOUTHEAST CORNER OF BUILDING B IS SHOWN
 DIFFERENTLY WITH DIFFERING WALL LOCATION AND COLORS
 HIGHLIGHTING ON THE VARIOUS GROUND FLOOR SHEETS. PLEASE
 PROVIDE CONSISTENT PLANS AND UPDATED ANY TABLES
 ACCORDINGLY.
  
 8) UPDATED COMMENT: ZONING INFORMATION TABLE ON SHEET
 A0.02 BASES THE AVERAGE TOWER FLOOR PLATE ON THE TOTAL
 SELLABLE SQUARE FOOTAGE, INSTEAD OF ON THE GROSS SQUARE
 FOOTAGE AS REQUIRED. PLEASE UPDATE THE NUMBERS
 ACCORDINGLY. SECTION 94-210.I.2.C OF THE NMUD
 REGULATIONS LIMIT THE TOWER FLOOR PLATE TO 30,000
 SQUARE FEET FOR ANY SINGLE FLOORPLATE WITH AND AVERAGE
 FLOORPLATE OF UP TO 20,000 SQUARE FEET. THE MAXIMUM
 TOWER FLOORPLATES ARE SHOWN AT 48,335 SQUARE FEET. THE
 NMUD FLOOR PLATE AVERAGE ONLY APPLIES TO THE TOWER
 LEVELS OF BUILDING A. PLEASE PROVIDE THE GROSS SQUARE
 FOOTAGE FOR EACH LEVEL INDIVIDUALLY FOR LEVELS 3-9. THE
 TABLE ON SHEET A0.03 COMBINES THE INFORMATION FOR
 LEVELS 3 AND 3.5, WHICH DOES NOT PERMIT STAFF TO
 CALCULATE THE AVERAGE TOWER FLOOR PLATE SQUARE FOOTAGE.
 THE INFORMATION ON THE TABLE ON SHEET A0.02 IS
 INCORRECT.
  
 TOWER FLOOR PLATE: 48,335 SQUARE FEET = VARIANCE
 REQUIRED
 AVERAGE TOWER FLOOR PLATE: UNABLE TO DETERMINE EXACT
 AVERAGE; HOWEVER, WILL EXCEED 20,000 SQUARE FEET =
 VARIANCE REQUIRED
  
 9) THE FLOOR PLAN SHEETS THAT SHOW LEVEL 1.5 FOR
 BUILDING B ARE NOT ACCURATE (SHEETS A103.1, A104.1,
 A305.1) WHEN COMPARED TO THE ELEVATION DRAWINGS.
 BUILDING B HAS NO LEVEL 1.5. THE LEVEL 1.5 PLANS
 INACCURATELY SHOW THE FLOOR PLAN LAYOUTS FROM LEVEL 2,
 INCLUDING THE LANDING POINT OF THE PEDESTRIAN BRIDGE.
 THE AREA FOR LEVEL 1.5 IS THE DOUBLE HIGH CEILING OF
 LEVEL 1 FOR THE NON-RESIDENTIAL AND THE 2ND FLOOR OF
 THE TOWNHOUSES. THE INCORRECT LOCATION OF THE
 PEDESTRIAN BRIDGE RESULTS IN THE LEVEL 2 FLOOR PLAN
 BEING SHOWN INCORRECTLY.
  
 10) THE FLOOR PLAN SHEETS THAT SHOW LEVEL 1.5 FOR
 BUILDING C ARE NOT ACCURATE (SHEETS A103.1, A104.1,
 A305.1) WHEN COMPARED TO THE ELEVATION DRAWINGS.
 BUILDING B IS NOT PERMITTED TO HAVE A LEVEL 1.5 AS THIS
 WOULD EXCEED THE ALLOWED NUMBER OF STORIES. THE AREA
 FOR LEVEL 1.5 IS THE DOUBLE HIGH CEILING OF LEVEL 1 FOR
 THE NON-RESIDENTIAL PORTION OF THE BUILDING. AS
 DISCUSSED IN THE LAST MEETING WITH STAFF, THIS ARE IS
 PERMITTED TO BE A MEZZANINE FOR THE RESIDENTIAL UNITS
 BUT MAY NOT BE A 2ND FLOOR FOR A TOWNHOUSE PRODUCT. THE
 INFORMATION TO VERIFY THAT IT COMPLIES WITH THE
 MEZZANINE REQUIREMENTS MUST BE PROVIDED.
  
 11) THE BUILDING INFORMATION TABLE ON SHEET A0.02
 INCORRECTLY LISTS THE STUDIO UNITS AS 500 SQUARE FEET,
 WHICH WOULD NOT COMPLY WITH NMUD MINIMUM UNIT SIZE.
  
 12) SHEET A200 IS MISSING THE TITLE BLOCK INFORMATION.
  
 13) UPDATED COMMENT: THE ARCHITECTURAL PLANS SHOW A
 SUPPORT COLUMN ALONG THE EAST SIDE OF NEW PINEWOOD THAT
 IS NOT SHOWN ON THE LANDSCAPE AND CIVIL PLANS. PLEASE
 REVIEW AND CORRECT AS NECESSARY.
  
 DESIGN STANDARDS
  
 14) UPDATED COMMENT: ACTIVE USE STANDARDS, INCLUDING
 TRANSPARENCY. THE PROPOSED NMUD CORE CODE AMENDMENT HAS
 UPDATED THE REQUIREMENTS. STAFF HAS REVIEWED THE
 BUILDINGS IN LIGHT OF THE NEW REQUIREMENTS AND
 COMMENTED BELOW. THE STAFF CALCULATIONS ARE BASED ON
 WHAT COULD BE DETERMINED FROM THE PLAN SHEETS. ACCURATE
 TABLES MUST BE INCLUDED ON THE PLANS. *** PLEASE NOTE
 THAT THE TRANSPARENCY/FENESTRATION IS BASED ON THE
 ACTIVE USES PROVIDED, NOT THE FACADE AREA. THIS WILL
 NOT HAVE AREAS SUCH AS THE TRASH ROOMS/BOH COUNT
 AGAINST YOUR TRANSPARENCY REQUIREMENT. HOWEVER, THE
 FULL HEIGHT OF THE GROUND FLOOR IS COUNTED INTO BOTH
 CALCULATIONS, SO THE DOUBLE HEIGHT PORTIONS OF
 BUILDINGS B AND C WHERE THERE IS ACTIVE USE, BUT NO
 FENESTRATION WILL COUNT AGAINST THE PERCENTAGE
 PROVIDED. RECOMMENDATION: YOU SHOULD ELABORATE IN YOUR
 VARIANCE JUSTIFICATION ON THIS AS IT RELATES TO THE
 ARCHITECTURAL DESIGN OF THESE BUILDINGS.
  
 ACTIVE USE: REQUIRED ALONG 23RD STREET, BROADWAY
 (CORE), 25TH STREET - GROUND FLOOR - 80%, UPPER FLOORS
 100%
  REQUIRED ALONG NEW PINEWOOD - GROUND FLOOR - 30%,
 UPPER FLOORS - N/A
  REQUIRED ALONG BROADWAY EXTENSION - GROUND FLOOR -
 80%, UPPER FLOORS - N/A
  REQUIRED ALONG PUBLIC OPEN SPACE - GROUND FLOOR -
 75%, UPPER FLOORS - 75%
  REQUIRED ALONG PUBLIC PASEO - GROUND FLOOR - 80%,
 UPPER FLOORS - N/A
  REQUIRED ALONG 24TH STREET, BROADWAY (TRANSITION),
 NORTHWOOD ROAD - ALL FLOORS 100%
  
 BUILDING A ACTIVE USE
  
 BROADWAY GROUND FLOOR: 90% COMPLIES
 BROADWAY UPPER FLOORS: ALL LEVELS 100% COMPLIES
 25TH STREET GROUND FLOOR: 94% COMPLIES
 25TH STREET LEVELS 1.5 & 2: 11% PROVIDED = VARIANCE
 REQUIRED SECTION 94-209.2.E.2.B.I.
 25TH STREET LEVEL 3 & ABOVE: 100% COMPLIES
 NEW PINEWOOD EAST: 64% COMPLIES
 NEW PINEWOOD WEST: 37% COMPLIES
 PUBLIC OPEN SPACE GROUND FLOOR: 92% COMPLIES
 PUBLIC OPEN SPACE UPPER FLOORS: 100% COMPLIES
 PUBLIC PASEO: 100% COMPLIES
  
 BUILDING B ACTIVE USE
  
 BROADWAY EXTENSION: 100% COMPLIES
 23RD STREET GROUND FLOOR: 85% COMPLIES
 23RD STREET UPPER FLOORS: 100% COMPLIES
 NEW PINEWOOD: 100% COMPLIES
 PUBLIC OPEN SPACE GROUND FLOOR: 97% COMPLIES
 PUBLIC OPEN SPACE UPPER FLOORS: 100% COMPLIES
  
 BUILDING C ACTIVE USE
  
 BROADWAY ALL FLOORS: 100% COMPLIES
 24TH STREET ALL FLOORS: 100% COMPLIES
 NORTHWOOD GROUND FLOOR: 92% PROVIDED = VARIANCE
 REQUIRED SECTION 94-209.2.J.H.I.1
 NORTHWOOD UPPER FLOOR: 100% COMPLIES
  
 TRANSPARENCY: REQUIRED ALONG 23RD STREET, BROADWAY
 (CORE), 25TH STREET - GROUND FLOOR NON-RESIDENTIAL -
 70%, GROUND FLOOR RESIDENTIAL - 30%, UPPER FLOORS - N/A
 FOR ALL ACTIVE USE AREAS
  REQUIRED ALONG NEW PINEWOOD - 50% OF GROUND FLOOR
 ACTIVE USE AREAS
  REQUIRED ALONG BROADWAY EXTENSION - 70% OF GROUND
 FLOOR ACTIVE USE AREAS
  REQUIRED ALONG PUBLIC OPEN SPACE - 70% OF ALL ACTIVE
 USE AREAS
  REQUIRED ALONG PUBLIC PASEO - 70% OF ALL ACTIVE USE
 AREAS
 REQUIRED ALONG 24TH STREET, BROADWAY (TRANSITION),
 NORTHWOOD ROAD - GROUND FLOOR NON-RESIDENTIAL - 70%,
 UPPER FLOORS - N/A FOR ALL ACTIVE USE AREAS
  
 BUILDING A TRANSPARENCY
  
 BROADWAY GROUND FLOOR: 100% COMPLIES
 25TH STREET GROUND FLOOR: 100% COMPLIES
 NEW PINEWOOD EAST: APPEARS TO EXCEED 50%, BUT NO
 TABULAR/GRAPHIC INFORMATION PROVIDED
 NEW PINEWOOD WEST: APPEARS TO EXCEED 50%, BUT NO
 TABULAR/GRAPHIC INFORMATION PROVIDED
 PUBLIC OPEN SPACE GROUND FLOOR: 100% COMPLIES
 PUBLIC OPEN SPACE UPPER FLOORS: TABULAR/GRAPHIC
 INFORMATION REQUIRED FOR LEVELS 1.5 AND 2 ONLY
 PUBLIC PASEO: APPEARS TO EXCEED 70%, BUT NO
 TABULAR/GRAPHIC INFORMATION PROVIDED
  
 THE NON-ACTIVE USE AREAS ON THE BUILDING A FENESTRATION
 DRAWINGS NEED TO BE SHOWN EXCLUDED FROM THE TABLE AND
 DRAWINGS.
  
 THE FENESTRATION TABLE INCORRECTLY LISTS THE NORTH
 ELEVATION OF BUILDING A AS HAVING NO FENESTRATION. THE
 100% IS SHOWN UNDER THE SOLID COLUMN.
  
 BUILDING B TRANSPARENCY
  
 BROADWAY EXTENSION GROUND FLOOR: SEE COMMENTS BELOW
 VARIANCE REQUIRED SECTION 94-210.M.5
 23RD STREET GROUND FLOOR: SEE COMMENTS BELOW VARIANCE
 REQUIRED SECTIONS 94-210.P.1.II & III
 NEW PINEWOOD GROUND FLOOR: 46% PROVIDED = VARIANCE
 REQUIRED SECTION 94-210.M.4
 PUBLIC OPEN SPACE GROUND FLOOR: 47% PROVIDED = VARIANCE
 REQUIRED SECTION 94-210.K.1.N
 PUBLIC OPEN SPACE UPPER FLOORS: 28% PROVIDED = VARIANCE
 REQUIRED SECTION 94-210.K.1.N
  
 BUILDING B COMMENTS
 I. BROADWAY EXTENSION (EAST ELEVATION). THE EAST
 ELEVATION FRONTS ON BROADWAY EXTENSION, WHICH REQUIRES
 A MINIMUM OF 70% OF THE ACTIVE USE TO BE HAVE
 TRANSPARENCY. THE TABLE LISTS 48% GROUND FLOOR
 TRANSPARENCY, YET THE ELEVATION DRAWING DOES NOT MATCH
 THE SITE PLAN AND DOES NOT SHOW THE FULL EXTENT OF THE
 OF THE SOUTHEAST CORNER OF THE BUILDING. *** VARIANCE
 REQUIRED
 II. 23RD STREET GROUND FLOOR (SOUTH ELEVATION). THE NEW
 REGULATIONS SEPARATE THE REQUIREMENTS FOR
 NON-RESIDENTIAL (MIN 70%) AND RESIDENTIAL (30%). SINCE
 THIS FACADE HAS BOTH, PLEASE PROVIDE THE TABLE
 ACCORDINGLY. IT APPEARS THAT THE RESIDENTIAL PORTION OF
 THE BUILDING WILL MEET CODE; HOWEVER, THE
 NON-RESIDENTIAL LOOKS LOW (DUE TO THE DOUBLE HEIGHT
 FLOOR) AND WOULD REQUIRE A VARIANCE. STAFF NEEDS THE
 FINAL NUMBER TO PROCEED TO THE PLANNING BOARD. PLEASE
 REMEMBER THAT THE TRANSPARENCY IS A PERCENTAGE OF THE
 ACTIVE USE, SO THE BOH AND TRASH ROOMS WOULD NOT BE
 INCLUDED AS THE BASE ACTIVE USE AREA. *** VARIANCE
 REQUIRED
  
 BUILDING C TRANSPARENCY
  
 BROADWAY GROUND FLOOR: 49% PROVIDED = VARIANCE REQUIRED
 SECTION-209.2.J.1.H.I.4
 24TH STREET GROUND FLOOR: 52% PROVIDED = VARIANCE
 REQUIRED SECTION-209.2.J.1.H.I.4
 NORTHWOOD GROUND FLOOR: 43% PROVIDED = VARIANCE
 REQUIRED SECTION-209.2.J.1.H.I.4
  
 15) UPDATED COMMENT: STAFF HAS REVIEWED THE INFORMATION
 PROVIDED FOR THE PLANAR BREAKS AND HAD THE FOLLOWING
 COMMENTS.
  
 BUILDING A PLANAR BREAKS
  
 BROADWAY GROUND FLOOR: 21% COMPLIES
 BROADWAY LEVEL 1.5: 13% THAT IS A MINIMUM OF 3 FEET IN
 DEPTH (PASEO) *** ADDITIONAL 35% OF THE FRONTAGE HAS A
 PLANAR BREAK THAT DOES NOT COMPLY WITH THE MINIMUM
 3-FOOT DEPTH = VARIANCE REQUIRED SECTION 94-209.2.J.1.A
 BROADWAY LEVEL 2: 42% COMPLIES *** DOES NOT COMPLY WITH
 THE MINIMUM 3-FOOT DEPTH = VARIANCE REQUIRED SECTION
 94-209.2.J.1.A
 BROADWAY LEVELS 3 & ABOVE: ALL LEVELS 43% COMPLIES
 25TH STREET GROUND FLOOR: 21% COMPLIES
 25TH STREET LEVELS 1.5 & 2: 52% COMPLIES *** DOES NOT
 COMPLY WITH THE MINIMUM 3-FOOT DEPTH = VARIANCE
 REQUIRED SECTION 94-209.2.J.1.A
 25TH STREET LEVEL 3 & ABOVE: 50% COMPLIES
  
 BUILDING B PLANAR BREAKS
  
 23RD STREET GROUND FLOOR: 24% COMPLIES
 23RD STREET UPPER FLOORS: 43% COMPLIES
  
 BUILDING C PLANAR BREAKS
  
 BROADWAY GROUND FLOOR: ** THIS IS INCORRECTLY
 CALCULATED; HOWEVER, SINCE THE ALLEY GAP IS 28% OF THE
 FRONTAGE, THE PLANAR BREAK COMPLIES.
 BROADWAY LEVELS 2 & 3: ** THIS IS INCORRECTLY
 CALCULATED, BOTH THE LENGTH OF THE BUILDING AND WHAT IS
 A PLANAR BREAK. THE ONLY PLANAR BREAK IS AT THE SOUTH
 END AT THE ANGLE AND RESULTS IN AN APPROXIMATELY 3%
 PLANAR BREAK. SECTION 94-209.2.J.1.A
  
 16) UPDATED COMMENT: PLANAR BREAKS ARE REQUIRED TO BE A
 MINIMUM OF THREE FEET IN DEPTH. THE DEPTH SHOWN FOR THE
 PLANAR BREAKS ON LEVELS 1.5 AND 2 OF BUILDING A ALONG
 25TH STREET AND BROADWAY ARE ONLY 1.6 FEET IN DEPTH,
 WHICH REQUIRES THE APPROVAL OF A VARIANCE. STAFF IS NOT
 PREPARED TO SUPPORT THE NEEDED VARIANCE REQUEST ALONG
 25TH STREET. THE SUGGESTIONS MADE BY ANA MARIA APONTE,
 CRA DEPUTY DIRECTOR, TO LESSEN THE VARIANCES THAT WOULD
 BE NEEDED WERE NOT IMPLEMENTED, SO THE STANDARD THAT
 THE, "VARIANCE GRANTED IS THE MINIMUM VARIANCE THAT
 WILL MAKE POSSIBLE THE REASONABLE USE OF THE LAND,
 BUILDING, OR STRUCTURE", HAS NOT BEEN MET.
  
 STREETSCAPE
  
 17) REPEAT COMMENT: THANK YOU FOR PROVIDING THE LIGHT
 POLE LOCATIONS ON THE SITE PLAN; HOWEVER, THERE IS ONE
 THAT IS IN DIRECT CONFLICT WITH A TREE AND MULTIPLE
 THAT ARE SHOWN IN PARKING SPACES AND THE TRAVEL LANE
 (ON ALL PLANS). THE POLES NEED TO BE SHOWN IN THE
 CORRECT LOCATION.
  
 18) THE POLE TYPE ALONG 25TH STREET NEEDS TO BE THE "S"
 TYPE TO MATCH THE POLES ON 25TH STREET EAST OF
 BROADWAY.
  
 19) THE CRA MUST APPROVE THE USE OF TWO DIFFERENT POLE
 STYLES ALONG BROADWAY BETWEEN 25TH STREET AND 23RD
 STREET. THEY ARE CURRENTLY "T" TYPE.
  
 PARKING/LOADING
  
 20) REPEAT COMMENT: PROVIDE VEHICLE TURNING RADIUS
 DRAWING FOR MOVING TRUCKS INTO/OUT OF THE LOADING
 AREAS. **** SHEET C4.02 ONLY SHOWS A MOVING TRUCK
 ACCESSING PINEWOOD, BUT NOT THE ACTUAL LOADING AREAS.
  
 21) THE PARKING REQUIRED AND PROVIDED TABLES AND THE
 TOTAL PARKING SPACES LINE BOTH CONTAIN ERRORS.
  
 A. SHEETS A103.1 AND SHEET A301.5 - THERE ARE ONLY 233
 PARKING SPACES, NOT 235 ON THIS LEVEL. ALSO ON SHEET
 A301.5 THE PARKING SPACE TYPE BREAKDOWN IS INCORRECT.
 B. THE L1.5 CRA LINE STATES THAT THERE ARE SPACES, BUT
 ONE OF THEM IS A DOUBLE COUNTED ADA SPACE THAT IS SHOWN
 IN THE ADA LINE.
 C. THE L1.5 PUBLIC PARKING LINE STATES THAT THERE ARE
 108 PARKING SPACES, WHEN THERE ARE 109 LABELED.
 D. SHEET A302 LISTS AN INCORRECT NUMBER OF PARKING
 SPACES.
 E. THE PARKING REQUIRED TABLE INCORRECTLY LISTS 384
 SPACES PROVIDED FOR THE RESIDENTIAL, WHEN 403 ARE
 PROVIDED AND 181 SPACES PROVIDED FOR THE COMMERCIAL,
 WHEN ONLY 128 ARE PROVIDED.
 F. ENSURE ALL TABLES AND INFORMATION ON ALL SHEETS
 SHOWS CONSISTENT, ACCURATE INFORMATION.
  
 22) THERE ARE SEVEN PARKING SPACES ON LEVEL 2 THAT SHOW
 COLUMN ENCROACHMENTS, WHICH ARE NOT PERMITTED.
  
 23) THANK YOU FOR PROVIDING THE DIMENSIONS FOR THE
 PARKING SPACES ALONG WALLS. THERE IS ONE PP SPACE AT
 THE NORTHWEST CORNER OF LEVEL 1.5 THAT DOES NOT HAVE
 THE EXTRA ROOM. THIS SPACE NEEDS TO BE MARKED AS
 COMPACT AND THE PARKING TABLE UPDATED WITH IT AS A LINE
 ITEM. NOTE: IF AT TIME OF CONSTRUCTION/PARKING SPACE
 STRIPING ADDITIONAL SPACES ARE IDENTIFIED AS LESS THAN
 A FOOT FROM THE WALL, THEY WILL ALSO NEED TO BE MARKED
 AS COMPACT WITH AN AMENDMENT TO THE SITE PLAN AT THAT
 TIME.
  
 24) THERE ARE 19 PARKING SPACES (18 PP & 1 ADA) LOCATED
 OUTSIDE OF THE GATES ON LEVEL 1.5 THAT APPEAR TO BE THE
 GUEST PARKING SPACES. PLEASE LABEL THESE AS THE GUEST
 SPACES ON THE PLANS. NOTE: THE NON-ADA SPACES WILL NEED
 TO BE MARKED AS GUEST WHEN CONSTRUCTED.
  
 25) SHEETS A103.1 AND A301.5 SHOW DIFFERING LOCATIONS
 FOR THE ADA VAN SPACES. ALL SHEETS NEED TO SHOW THE
 SAME CONDITION. PLEASE MAKE SURE THAT THE ADA GUEST
 SPACE IS AN ADA VAN SPACE SO THAT THERE IS ONE ADA VAN
 SPACE AVAILABLE OUTSIDE THE GATED AREA.
  
 26) THE PARKING SPACES TYP DETAIL SHOWS COLUMNS IN THE
 PARKING SPACES, WHICH IS NOT PERMITTED. THE DETAIL
 NEEDS TO BE CORRECTLY SHOWN.
  
 27) THE ADA PARKING SPACE DETAIL CONTAINS A BLOW UP OF
 THE SPACE BETWEEN THE STRIPING THAT DOES NOT CONFORM TO
 CITY CODE. THE CITY REQUIRES 12 INCHES BETWEEN THE
 STRIPES. A DETAIL CAN BE PROVIDED IF NEEDED.
  
 28) REPEAT COMMENT: THANK YOU FOR PROVIDING THE BICYCLE
 RACK MODEL DETAIL AND DIMENSIONS THAT WILL BE USED IN
 THE BICYCLE STORAGE ROOMS. THIS MODEL NEEDS TO BE SHOWN
 IN THE BICYCLE STORAGE ROOMS TO INCLUDE THE DIMENSIONS
 OF THE ROOM AND THE RACKS IN THE ROOM. **** THE BICYCLE
 ROOM DETAILS DO NOT SHOW THE SAME RACK OR THE
 DIMENSIONS THAT ARE ON THE DETAIL. ADDITIONALLY, STAFF
 ATTEMPTED TO CALCULATE THE NUMBER OF BICYCLES THAT
 COULD BE STORED, AND THEY DO NOT MATCH THE NUMBER OF
 RACKS IN EITHER THE RESIDENTIAL OR THE COMMERCIAL
 ROOMS.
  
 29) UPDATED COMMENT: THANK YOU FOR SHOWING BICYCLE
 FACILITIES AT 13 LOCATIONS (MOSTLY IN GROUPS OF THREE
 RACKS FOR SIX BICYCLES AT EACH LOCATION) THROUGHOUT THE
 SITE AS WELL AS THE POST AND HITCH MODEL. PLEASE
 PROVIDE THE PAD DETAIL SHOWING THE DIMENSIONS BASED ON
 THE NUMBER OF POSTS THAT WILL BE INSTALLED. THE PAD
 DETAIL MUST INCLUDE THE RACK(S) AND THE DIMENSIONS FROM
 THE RACKS TO THE EDGE OF THE PAD. ADDITIONALLY,
 DIMENSIONED PAD BOX NEEDS TO BE INCLUDED ON THE PLAN SO
 THAT STAFF CAN VERIFY THAT PARKED BICYCLES WILL NOT
 IMPEDE THE PEDESTRIAN TRAVEL PATHS OR BE WITHIN A
 LANDSCAPE ISLAND OR OTHERWISE HAVE NONFUNCTIONING
 BICYCLE PARKING. FOR CLARITY THIS DETAIL SHALL BE
 PROVIDED AT A BIGGER SCALE. STAFF HAS NOTED THAT THE
 HARDSCAPE DETAIL PLAN CALLS OUT A QUANTITY OF 10 POSTS,
 WHICH WOULD NOT PERMIT THE INSTALLATION OF BICYCLE
 PARKING AT ALL THE LOCATION SHOWN NOR AT THE QUANTITY
 OF BICYCLE PARKING SHOWN.
  
 LANDSCAPE
  
 30) THE PUBLIC OPEN SPACE DIAGRAMS ARE NOT CORRECTLY
 DEPICTED AND DO NOT CLEARLY SHOW COMPLIANCE WITH THE
 PUBLIC OPEN SPACE REQUIREMENTS. STAFF WILL PROVIDE A
 MARK-UP UNDER SEPARATE COVER HIGHLIGHTING WHAT NEEDS TO
 BE SHOWN.
  
 31) THE MINIMUM 10% PERVIOUS REQUIREMENT IS NOT SHOWN
 AS BEING MET ON THE LANDSCAPE PLAN FOR BOTH THE
 BUILDING A & B PARCEL AND THE BUILDING C PARCEL. WHILE
 BUILDING C IS A CONSTRAINED SITE, THE PROVISION OF THE
 PUBLIC OPEN SPACE, THE BUFFER ALONG THE RAILROAD TRACK
 AND THE AREA ON THE EAST SIDE OF THE BROADWAY EXTENSION
 SEEM TO OFFER SUFFICIENT AREA TO MEET THE 10% MINIMUM.
 IF THERE IS INSUFFICIENT DIRECT PERVIOUS AREA DUE TO
 LANDSCAPE, YOU WILL NEED TO INSTALL A PERVIOUS PAVER
 SYSTEM TO GET TO THE MINIMUM 10%. BUILDING C = VARIANCE
 REQUIRED SECTION 94-210.I.3. PLANNING STAFF DOES NOT
 SUPPORT WAIVING THE MINIMUM PERVIOUS SURFACE
 REQUIREMENT FOR BUILDING A & C.
  
 WAIVERS/VARIANCES
  
 32) SECTION 94-209.2.J.1.A - THE MAXIMUM HORIZONTAL
 DIMENSION OF A BUILDING WITHIN THE MIXED-USE DISTRICTS
 IS 250 FEET. BUILDING A EXCEEDS THIS ON ALL FRONTAGES.
 STAFF IS UNABLE TO LOCATE THE FULL NORTH/SOUTH
 DIMENSION FOR LEVEL 2 AS THIS IS THE LARGEST
 FLOORPLATE. PLEASE CLEARLY PROVIDE ON ONE OF THE LEVEL
 2 SITE PLANS. **** VARIANCE REQUIRED.
  
 33) SECTION 94-210.I.3.A - THE MAXIMUM LOT WIDTH FOR
 FLEX BUILDINGS IS 200 FEET AND TOWER BUILDINGS IS 250
 FEET.
  
 BROADWAY LOT WIDTH: 554.75 FEET = VARIANCE REQUIRED.
  
 34) SECTION 94-209.2.K.1 - THE MAXIMUM BLOCK LENGTH IS
 600 FEET. THE CURRENT BLOCK LENGTH IS 810 FEET (SPRUCE
 TO PINEWOOD) WITH THE ABANDONMENT OF PINEWOOD EXTENDING
 THIS TO 965 FEET AT ITS FURTHEST POINT WEST AT 25TH
 STREET AND THE FEC RR.
  
 EAST/WEST BLOCK LENGTH: 965 FEET = VARIANCE REQUIRED.
  
 35) SECTION 94-209.2.K.2 - THE MAXIMUM BLOCK PERIMETER
 LENGTH IS 1,900 FEET. THE ABANDONMENT OF THE
 RIGHTS-OF-WAY RESULT IN A BLOCK WITH A PERIMETER OF
 SPRUCE, 23RD, FEC RR, 25TH, BROADWAY AND NORTHWOOD THAT
 IS 2,192 FEET IN LENGTH.
  
 36) SECTION 94-210.I.2.B - A SETBACK OF 15 FEET FROM
 THE ALLEY IS REQUIRED FOR BUILDING C. THIS IS MET ON
 THE GROUND FLOOR BUT NOT ON THE UPPER FLOORS WHERE THE
 PLANS SHOW THE BUILDING STRADDLING THE ALLEY.
  
 37) CONDITION: ACCESS EASEMENT REQUIRED FOR ANY
 PORTIONS OF SIDEWALKS ON PRIVATE PROPERTY AND THE
 ROADWAYS TRAVERSING THE SITE AND THE PARKING SPACES ON
 PRIVATE PROPERTY.
  
 38) CONDITION: AREAL EASEMENT REQUIRED WHERE BUILDING C
 STRADDLES THE ALLEY.
  
  

Review Stop Z ZONING
Rev No 4 Status F Date 08-17-2022 Cont ID  
Sent By eschneid Date 08-17-2022 Time 15:33 Rev Time 16.00
Received By eschneid Date 08-08-2022 Time 11:14 Sent To  
Notes
2022-08-17 15:33:49CASE NO. 1895 ? JULY 19, 2022 RESUBMITTAL
 NORTHWOOD COMMONS - NMUD ANCHOR SITE
 BROADWAY & 24TH STREET
  
 - CONTACT ERIC SCHNEIDER @ (561) 822-1446,
 [email protected]
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE THREE (3) PAPER
 COPIES AND AN ELECTRONIC COPY IN .PDF AND .PNG FORMAT
 OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS
 TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL
 COMMENTS.
  
 - ONCE THE COMMENTS ARE RESUBMITTED AND DEEMED
 SUFFICIENTLY ADDRESSED, THE CASE WILL BE SCHEDULED FOR
 THE NEXT AVAILABLE PLANNING BOARD MEETING.
  
 - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT
 RECEIVED A RESPONSE TO THE COMMENTS WITHIN 60 DAYS FROM
 THE DATE OF THESE COMMENTS (BY OCTOBER 17, 2022), THE
 PLANNING DIVISION MAY NOTIFY THE APPLICANT THAT THE
 CASE IS CONSIDERED WITHDRAWN. ANY FURTHER ACTION SHALL
 REQUIRE A NEW DEVELOPMENT APPLICATION.
  
 - PLEASE NOTE THAT PREVIOUSLY ISSUED COMMENTS CONTINUE
 WERE NOT ADDRESSED, SO THE APPLICANT IS ASSESSED A
 RESUBMITTAL FEE. SUCH FEE WILL BE 20% OF THE ORIGINAL
 APPLICATION FEE ($600).
  
 - PUBLIC HEARING NOTIFICATION SIGNAGE SHALL BE POSTED
 IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION
 94-39(I)(5) OF THE ZONING AND LAND DEVELOPMENT
 REGULATIONS.
  
 THE PROPOSED DEVELOPMENT REQUIRES AMENDMENTS TO THE
 ZONING AND LAND DEVELOPMENT REGULATIONS, WHICH MUST BE
 ADOPTED PRIOR TO THE FINAL SITE PLAN APPROVAL. THE
 RECENTLY ADOPTED CHANGE TO THE NMUD APPROVAL PROCESS
 WILL SEE THIS APPLICATION BE REVIEWED BY THE PLANNING
 BOARD AS A SPECIAL REVIEW, WHICH INCLUDES THEIR ABILITY
 TO GRANT WAIVERS AND VARIANCES. STAFF HAS IDENTIFIED
 MORE THAN THE THREE LISTED ON SHEET A0.02. NO
 JUSTIFICATION WAS PROVIDED FOR EACH WAIVER AND VARIANCE
 REQUESTED/REQUIRED. UNTIL ALL INFORMATION IS PROVIDED,
 STAFF IS WITHHOLDING DETERMINATION ON SUPPORT/NOT
 SUPPORT OF EACH INDIVIDUAL WAIVER AND VARIANCE.
  
 1) UPDATED COMMENT: PROVIDE A REVISED TRAFFIC
 PERFORMANCE STANDARDS APPROVAL LETTER FROM THE PALM
 BEACH COUNTY TRAFFIC DIVISION FOR THE SCOPE OF THE
 PROPOSED DEVELOPMENT BASED ON THE UPDATED PLANS AND
 TRAFFIC IMPACT ANALYSIS (66,200 SF RETAIL AND 381 DU).
 THE TRAFFIC LETTER NEEDS TO REFLECT THAT THE ANCHOR
 SITE PROJECT BOUNDARIES ARE NOT VACANT, BUT THAT THE
 CONTAIN BUILDINGS (3) AS SHOWN ON THE SURVEY. *** THE
 LATEST TIA SHOWS THE NEW USE MIX HAVING LESS IMPACT
 THAN WHAT THE CURRENT TPS LETTER, DATED MAY 13, 2022,
 SHOWS; HOWEVER, THAT UNDER THE NEW SPECIAL REVIEW
 PROCESS, THE PLANNING BOARD IS THE APPROVING AUTHORITY,
 SO THE TPS LETTER IS REQUIRED PRIOR TO SCHEDULING THE
 CASE BEFORE THE PLANNING BOARD.
  
 2) THE PLANS DO NOT SHOW THE FOLLOWING ITEMS THAT ARE
 LISTED IN THE TRAFFIC IMPACT ANALYSIS:
  
 A. ADDITION OF 80-FOOT EASTBOUND AND WESTBOUND LEFT
 TURN LANES ON 25TH STREET, AT THE INTERSECTION OF 25TH
 STREET AND PINEWOOD AVENUE.
 B. CONVERSION OF 23RD STREET FROM ONE-WAY FLOW TO
 TWO-WAY FLOW BETWEEN PINEWOOD AVENUE AND THE PROPOSED
 BROADWAY EXTENSION.
  
 3) REPEAT COMMENT: PROVIDE A PREDETERMINATION LETTER
 FROM FDOT FOR THE IMPROVEMENTS WITHIN THE FDOT
 RIGHTS-OF-WAY OF BROADWAY AND 24TH AND 25TH STREETS
 ADJACENT TO THE PROJECT. *** THIS IS REQUIRED PRIOR TO
 SCHEDULING A PLANNING BOARD HEARING.
  
 4) THE UNIT COUNT HAS INCREASED, SO AN UPDATED SCAD IS
 REQUIRED.
  
 5) BUILDING C: PLANNING STAFF HAS NOTED THAT THE
 COMMENT BY THE CITY SURVEYOR REQUIRING 25-FOOT
 CLEARANCE OVER THE ALLEY HAS NOT BEEN MET. THIS
 CLEARANCE IS REQUIRED SO THAT THERE IS ADEQUATE
 CLEARANCE FOR ANY UTILITY MAINTENANCE WITHIN THE ALLEY.
 PLEASE REMEMBER THAT THE MAXIMUM FIRST STORY HEIGHT IS
 20 FEET.
  
 6) ELEMENTS OF THE NORTHEAST CORNER OF BUILDING B
 ENCROACHES INTO THE REQUIRED 10-FOOT PRIMARY A SETBACK
 FROM BROADWAY. THIS NEEDS TO BE CORRECTED OR A VARIANCE
 REQUESTED.
  
 7) THE WAIVER/VARIANCE TABLE ON SHEET A0.02 NEEDS TO
 CORRECTLY SHOW THAT THE MAXIMUM AVERAGE FLOORPLATE IS
 DEPENDENT ON THE TOWER'S PRIMARY USE, WHICH IS
 RESIDENTIAL - 30,000 SQUARE FEET FOR ANY SINGLE
 FLOORPLATE WITH AND AVERAGE FLOORPLATE OF UP TO 20,000
 SQUARE FEET.
  
 8) THE BUILDING B ELEVATION DRAWINGS SHOW THE
 PEDESTRIAN BRIDGE WITH A BASE ELEVATION OF 20 FEET IN
 LINE WITH LEVEL 2; HOWEVER, THE BUILDING A ELEVATION
 DRAWINGS SHOW THE PEDESTRIAN BRIDGE WITH A BASE
 ELEVATION OF 27 FEET. PLEASE PROVIDE THE CROSS SLOPES
 SO THAT ADA COMPLIANCE CAN BE VERIFIED.
  
 DESIGN STANDARDS
  
 9) UPDATED COMMENT: ACTIVE USE STANDARDS -
  
 A. BUILDING B - THE ELEVATION LABELS AND THE SCALE ARE
 INCORRECT ON SHEET A101.2. BY DEFINITION, THE ENTIRE
 GROUND FLOOR IS DEFINED AS STOREFRONT, REGARDLESS OF
 THE USE; THEREFORE, THE RESIDENTIAL PORTION OF THE
 BUILDING MUST BE INCLUDED IN THE STOREFRONT GLAZING
 CALCULATIONS.
 B. BUILDING C - THE RESIDENTIAL PORTION OF THE BUILDING
 MUST BE INCLUDED IN THE STOREFRONT GLAZING
 CALCULATIONS. THE NORTHWEST CORNER NEEDS TO BE
 INCLUDED. THE EAST ELEVATION TABLE INFORMATION IS
 BACKWARDS (NOT 100% FENESTRATION).
 C. CODE TEXT WILL INCLUDE CLARIFICATION THAT ACTIVE
 USES ARE NOT REQUIRED ALONG THE RR.
  
 10) UPDATED COMMENT: SECTION 94-209.J.A. REQUIRES THE
 PROVISION OF PLANAR BREAKS FOR FRONTAGES EXCEEDING 150
 FEET IN LENGTH. THE PLANAR BREAK CALCULATIONS FOR THE
 FRONTAGES OF BUILDINGS B AND C THAT EXCEED 150 FEET
 WERE NOT PROVIDED. THE PLANAR BREAK CALCULATIONS WERE
 NOT PROVIDED FOR THE GROUND FLOOR OF BUILDING A. PLANAR
 BREAKS ARE REQUIRED, REGARDLESS OF THIS BEING
 STOREFRONT.
  
 11) PLANAR BREAKS ARE REQUIRED TO BE A MINIMUM OF THREE
 FEET IN DEPTH. THE DEPTH SHOWN FOR THE PLANAR BREAKS ON
 LEVELS 1.5 AND 2 OF BUILDING A ALONG 25TH STREET AND
 BROADWAY ARE ONLY 1.6 FEET IN DEPTH, WHICH REQUIRES THE
 APPROVAL OF A VARIANCE. STAFF IS NOT PREPARED TO
 SUPPORT THIS VARIANCE REQUEST AS NO JUSTIFICATION HAS
 BEEN PROVIDED FOR WHY THESE CANNOT MEET THE MINIMUM
 REQUIREMENT. IF THE PLAN IS TO PROCEED WITH A VARIANCE
 REQUEST, THEN YOU MUST PROVIDE NOT ONLY THE
 JUSTIFICATION FOR THE VARIANCE, BUT ALSO BETTER DETAILS
 AS TO WHAT THE ELEVATIONS WILL LOOK LIKE IF THE
 VARIANCE IS APPROVED, TO INCLUDE THE SPECIFIC
 ARCHITECTURAL TREATMENT THAT WILL OFFSET THE REDUCED
 DEPTH DIMENSION.
  
 12) REPEAT COMMENT: PROVIDE THE DIMENSIONS OF THE
 PROJECTIONS AND ENCROACHMENTS (EX. BALCONIES AND OTHER
 ARCHITECTURAL FEATURES) ON THE PLANS AND ELEVATIONS SO
 THAT STAFF CAN VERIFY COMPLIANCE WITH THE NMUD
 REGULATIONS. THIS HAS NOT BEEN PROVIDED FOR ALL THE
 FACADES ON ALL THE BUILDINGS. **** THE FOLLOWING ARE
 FEATURES THAT DID NOT HAVE DIMENSIONS PROVIDED. ANY
 FEATURES THAT DO NOT MEET MINIMUM OR MAXIMUM
 ENCROACHMENT ALLOWANCE WILL REQUIRE A VARIANCE.
  
 A. THE NORTH AND EAST ELEVATION DRAWINGS FOR BUILDING A
 CALL OUT AN ALUMINUM CANOPY ON THE UPPER PORTION OF THE
 GROUND LEVEL; HOWEVER, NO DETAILS OF THIS CANOPY, TO
 INCLUDE DIMENSIONS, ARE PROVIDED SO THAT STAFF CAN
 VERIFY CODE COMPLIANCE. ADDITIONALLY, THE CANOPY IS NOT
 SHOWN ON THE SIDES OF THESE ELEVATION DRAWINGS
 EXTENDING FROM THE BUILDING.
 B. THE BALCONY THAT WRAPS BUILDING B.
 C. THE CANOPY ON BUILDING C. NOTE: THE CANOPY IS SHOWN
 ON THE ELEVATION DRAWINGS, BUT NOT THE SITE/FLOOR
 PLANS. ADDITIONALLY, IT IS SHOWN ENCROACHING INTO THE
 RIGHT-OF-WAY.
  
 13) THE AREA WITH THE UNITS SUPPORTED OVER THE
 ABANDONED PORTION OF NORTHWOOD ROAD IS LABELED AS A
 COLONNADE. PLEASE REMOVE THIS NOMENCLATURE AS BY THE
 NMUD REGULATIONS THIS DOES NOT MEET THE COLONNADE
 ALLOWANCES, SPECIFICALLY, THE DEPTH EXCEEDS THE HEIGHT
 AND COLONNADES ARE NOT PERMITTED TO HAVE ENCLOSED USED
 ABOVE.
  
 14) SECTION 94-209.2.J.1.H REQUIRES ARCHITECTURAL
 FEATURES OR ARCHITECTURAL TREATMENT ON ALL FACADE
 ELEVATIONS. THE BLANK WALL SHOWN ON THE EAST ELEVATION
 OF BUILDING C IS NOT PERMITTED.
  
 15) AS PART OF THE REALIGNMENT OF PINEWOOD AS A PRIVATE
 DRIVE, STAFF WILL BE ADDING THE FOLLOWING PROVISION TO
 THE NMUD REGULATIONS TO ENSURE THAT ACTIVE USES AND
 TRANSPARENCY ARE MAINTAINED ALONG THE DRIVE. PLEASE
 PROVIDE THE DIMENSIONS ALONG THE WEST SIDE OF NEW
 PINEWOOD TO VERIFY THAT THE LANGUAGE MATCHES THE
 PROPOSED BUILDING DESIGN.
  
 "THE REALIGNED PORTION OF PINEWOOD AVENUE SHALL HAVE A
 MINIMUM OF 60 FEET BETWEEN BUILDING FACADES AND THE
 TRAVEL LANES SHALL NOT TOTAL MORE THAN 20 FEET IN
 WIDTH. SIDEWALKS AND ON-STREET PARKING SHALL BE
 PROVIDED. A MINIMUM OF 50 PERCENT OF THE BUILDING
 FRONTAGES ALONG EACH SIDE THE REALIGNED PORTION OF
 PINEWOOD AVENUE SHALL CONFORM TO THE GROUND FLOOR
 ACTIVE USE REQUIREMENTS."
  
 16) ACCESS EASEMENT REQUIRED FOR ANY PORTIONS OF
 SIDEWALKS ON PRIVATE PROPERTY AND THE ROADWAYS
 TRAVERSING THE SITE AND THE PARKING SPACES ON PRIVATE
 PROPERTY.
  
 17) SHEET A400 CUTS OFF THE ELEVATION HEIGHT DIMENSIONS
 UNDER THE TITLE BLOCK. PLEASE REVISE.
  
 18) THE BUILDING A ELEVATION DRAWINGS FAIL TO SHOW THE
 COLUMNS/BALCONY SEPARATORS THAT ARE SHOWN ON THE FLOOR
 PLANS RUNNING THE FULL HEIGHT OF THE BUILDING. NOTE:
 THE RENDERINGS AND THE ELEVATION DRAWINGS FOR BUILDING
 A SHOW A NUMBER OF DIFFERENCES.
  
 STREETSCAPE
  
 19) UPDATED COMMENT: THE SITE PLAN NEEDS TO SHOW THE
 ABOVE GROUND UTILITIES AND SITE FEATURES SUCH AS THE
 FIRE HYDRANTS, LIGHT POLES, VERIZON POLE, BOLLARDS,
 ETC. TO ACCURATELY REFLECT THE SITE CONDITIONS.
  
 20) REPEAT COMMENT: NO DETAILS WERE PROVIDED ON THE
 SITE LIGHTING TO VERIFY COMPLIANCE WITH THE NMUD
 REGULATIONS. *** THIS IS REQUIRED PRIOR TO SCHEDULING A
 PLANNING BOARD HEARING SO THAT STAFF CAN VERIFY THAT
 THERE IS NO INCONSISTENCY WITH THE CODE REQUIREMENTS.
 THE MIXED-USE DEVELOPMENT REGULATIONS REQUIRE THAT
 STREETLIGHTS BE PROVIDED ALONG PUBLIC RIGHTS-OF-WAY
 ADJACENT TO THE SITE. CLEARLY SHOW THE PEDESTRIAN
 ORIENTED LIGHTING FOR THE SIDEWALKS ALONG THE SITE AND
 WITHIN THE PASEO ON THE PLANS. THE LANDSCAPE AND CIVIL
 PLANS INDICATE THAT SOME EXISTING LIGHTS WILL REMAIN,
 BUT NOT ALL OF THE SITE IS COVERED.
  
 21) REPEAT COMMENT: THANK YOU FOR INCLUDING A NOTE
 STATING WHERE THE SIDEWALKS OR WALKWAYS CROSS THE
 DRIVEWAY ENTRANCES TO THE PARKING FACILITIES, LOADING
 AREAS, OR STREETS (BOTH PRIVATE AND PUBLIC), THE
 SIDEWALK OR WALKWAY IS CONTINUOUS AND REMAINS AT A
 CONSTANT LEVEL; HOWEVER, THIS NEEDS TO BE SHOWN IN
 CROSS-SECTION (OR OTHER GRAPHIC METHOD) ON THE PLANS,
 PREFERABLY THE CIVIL PLANS. **** STAFF IS UNABLE TO
 LOCATE THE CROSS-SECTION DEMONSTRATING THE CONTINUOUS
 SIDEWALK AT A CONSTANT LEVEL ON SHEET C2.05 AS STATED
 IN THE KIMLEY HORN RESPONSE LETTER.
  
 22) UPDATED COMMENT: THE LANE WIDTH DIMENSIONS ON
 EITHER SIDE OF THE MEDIANS IN BROADWAY NEED TO BE
 PROVIDED. NEITHER THE CIVIL PLANS NOR THE ARCHITECTURAL
 PLANS INCLUDE THIS DIMENSION. NOTE: THE LINE WEIGHT ON
 SOME OF THE LAYERS ON THE ARCHITECTURAL PLANS ARE SO
 FAINT THAT THEY ARE UNREADABLE ? AN EXAMPLE IS THE
 CURBS ALONG BROADWAY.
  
 23) UPDATED COMMENT: ROADWAY CROSS-SECTIONS.
  
 A. SECTION A-A ON SHEET C2.05 SHOWS 9.5-FOOT WIDE
 SIDEWALKS, WHILE THE SAME LOCATION ON SHEET A-301 SHOWS
 10-FOOT WIDE SIDEWALKS. ALL PLANS MUST SHOW THE SAME,
 ACCURATE CONDITIONS.
 B. SECTION E-E ON SHEET A2.05 SHOWS A 16.5-FOOT SETBACK
 FOR BUILDING A, WHILE SHEET A301 SHOWS A 16-FOOT
 SETBACK. A 5.2-FOOT SETBACK IS SHOWN TO BUILDING B IN
 SECTION E-E, WHILE SHEET A200 SHOWS THE BUILDING AT THE
 5-FOOT SETBACK LINE. ALL PLANS MUST SHOW THE SAME,
 ACCURATE CONDITIONS.
 C. PROVIDE THE DIMENSION FROM THE EDGE OF THE PARKING
 SPACES TO BUILDING B THAT IS SHOWN ON SECTION F-F ON
 SHEET A2.05 ON A301. NOTE: SOME OF THE DIMENSION LINES
 THAT WERE PREVIOUSLY SHOWN ON SHEET A301 ARE NO LONGER
 INCLUDED.
 D. SECTION E-E ON SHEET A2.05 SHOWS A 16.6-FOOT SETBACK
 FOR BUILDING A, WHILE SHEET A301 SHOWS A 16-FOOT
 SETBACK. ALL PLANS MUST SHOW THE SAME, ACCURATE
 CONDITIONS.
  
 24) REPEAT COMMENT: THE EXTENSION OF BROADWAY AND
 CONCURRENT CLOSING OF THE VEHICULAR CONNECTIONS BETWEEN
 BROADWAY AND PINEWOOD RESULTS IN MORE TRAFFIC BEING
 ROUTED TO 23RD STREET SOUTH OF THE PROJECT. CURRENTLY
 23RD STREET WEST OF THE BROADWAY EXTENSION IS ONE-WAY
 WEST WITH A BULB OUT TO RESTRICT THE EASTWARD FLOW OF
 TRAFFIC. THIS WILL NEED TO BE REMOVED AND THIS SECTION
 OF 23RD STREET REOPENED TO TWO-WAY TRAFFIC, WITH
 APPROPRIATE TRAFFIC MARKINGS. **** THE COMMENT RESPONSE
 STATES THAT THIS IS SHOWN ON THE CIVIL PLANS, YET IT IS
 NOT DEFINED IN THIS AREA. THE TRAFFIC IMPACT STATEMENT
 LISTS THIS A REQUIREMENT.
  
 25) CHECK THE CLEARANCES BETWEEN THE BOLLARDS AND PASEO
 COLUMNS WHERE THE PASEO CROSSES PINEWOOD. YOU MAY WANT
 TO ADJUST THE SPACING TO ALLOW A MORE COMFORTABLE
 PEDESTRIAN EXPERIENCE WALKING NORTH/SOUTH.
  
 PARKING/LOADING
  
 26) REPEAT COMMENT: PROVIDE VEHICLE TURNING RADIUS
 DRAWING FOR MOVING TRUCKS INTO/OUT OF THE LOADING
 AREAS. **** SHEET C4.01 IS THE GARBAGE TRUCK PLAN, NOT
 THE MOVING TRUCK PLAN.
  
 27) THERE ARE A FEW PARKING SPACES THAT ARE ADJACENT TO
 WALLS THAT DO NOT APPEAR TO HAVE AN ADDITIONAL ONE FOOT
 TO ALLOW FOR THE OPENING OF DOORS. EITHER PROVIDE THAT
 THESE SPACES HAVE ADEQUATE CLEARANCE, OR THEY WILL NEED
 TO BE DESIGNATED AS COMPACT PARKING SPACES. THE PARKING
 TABLE WILL NEED TO BE UPDATED ACCORDINGLY.
  
 28) UPDATED COMMENT: THERE ARE TWO SPACE LABELS IN THE
 NORTHEAST CORNER OF LEVEL 2 THAT ARE SHOWN IN CONFLICT
 WITH THE ELEVATOR/STAIRS. THIS NEEDS TO BE CORRECTLY
 SHOWN.
  
 29) UPDATED COMMENT: DEAD END PARKING ROWS FOR CRA
 PARKING IS NOT PERMITTED WITHOUT A TURNAROUND SPACE.
 THE DEAD-END PARKING ROW ON LEVEL 1.5 THAT IS LABELED
 AS CRA MUST CONTAIN A TURNAROUND SPACE, DUE TO THE
 GATE. IT DOES NOT APPEAR THAT THE OPEN AREA ADJACENT TO
 THE GATE OPPOSITE THE LAST PARKING SPACE HAS SUFFICIENT
 AREA TO ACT AS A TURN AROUND.
  
 30) THE NEWLY SHOWN CRA PARKING AREA ON LEVEL 1.5 IS
 GATED AND DOES NOT HAVE AN ADA COMPLIANT PARKING SPACE
 AND ACCESSIBLE ACCESS TO THE GROUND LEVEL. PROVIDE AN
 ADA SPACE AND ACCESSIBLE ROUTE TO THE ELEVATOR THAT
 DOES NOT REQUIRE THE USER TO TRAVEL BEHIND PARKED CARS.
 THIS WILL REQUIRE THE REMOVAL OF TWO PARKING SPACES
 (ONE CRA AND ONE DP). NOTE: THE ADA PARKING SPACE AND
 AISLE BETWEEN THE CRA AND PP ON THE NORTH HALF OF THE
 GARAGE MAY BE REPLACED WITH THE OTHER REMOVED CRA
 SPACES.
  
 31) THE RETAIL REQUIRES 132 PARKING SPACES. THE PLAN
 DOES NOT SHOW SUFFICIENT PP SPACES (CRA SPACES MAY NOT
 BE USED) TO ACCOMMODATE THE MINIMUM REQUIREMENT. NOTE:
 THIS WOULD BE FURTHER REDUCED IF FDOT DOES NOT APPROVE
 THE DESIGN FOR BROADWAY.
  
 REGULAR PP SPACES LEVEL 1.5: 89
 ADA PP SPACES LEVEL 1.5: 5
 ON-STREET PP SPACES: 34
 TOTAL PP SPACES: 128
  
 32) WHERE ARE THE 19 GUEST SPACES LOCATED WITHIN THE
 GARAGE AND HOW ARE THEY ACCESSED BY GUESTS? THERE IS NO
 CALL BOX SHOWN ON THE PLANS THAT WOULD ALLOW THE GUESTS
 TO CONTACT A UNIT OWNER TO BE GRANTED ACCESS TO THE
 GATE-CONTROLLED AREA. ANY CALL BOX NEEDS TO BE LOCATED
 SUCH THAT TRAFFIC FLOW AND PARKING IS NOT INHIBITED
 WHILE GUESTS ARE AWAITING ENTRANCE.
  
 33) THE PARKING TABLE ON SHEET A103.3 DOES NOT MATCH
 THE PARKING TABLE ON SHEET A103.1, WHICH SEEMS TO
 CORRECTLY DEPICT WHAT IS SHOWN ON THE PLANS. ALL PAGES
 MUST SHOW CONSISTENT, ACCURATE, CODE COMPLIANT
 INFORMATION.
  
 34) UPDATED COMMENT: THE PARKING REQUIREMENT MULTIPLIER
 FOR THE RESIDENTIAL PORTION OF THE PROJECT IS
 INCORRECTLY SHOWN AS 1 PER 20 INSTEAD OF 1 PER 10 ON
 THE PARKING REQUIRED TABLE. THE PROJECT REQUIRES 14
 BICYCLE SPACES FOR THE COMMERCIAL PORTION (ROUND UP
 PARTIAL SPACES).
  
 35) UPDATED COMMENT: THANK YOU FOR PROVIDING THE
 BICYCLE RACK MODEL DETAIL AND DIMENSIONS THAT WILL BE
 USED IN THE BICYCLE STORAGE ROOMS. THIS MODEL NEEDS TO
 BE SHOWN IN THE BICYCLE STORAGE ROOMS TO INCLUDE THE
 DIMENSIONS OF THE ROOM AND THE RACKS IN THE ROOM.
  
 36) UPDATED COMMENT: ON-STREET BICYCLE FACILITIES ARE
 REQUIRED. THE DEVELOPMENT COVERS A LARGE AREA AND WHILE
 EMPLOYEES AND RESIDENTIAL VISITORS CAN BE EXPECTED TO
 USE THE BICYCLE PARKING ROOM AT THE NORTHWEST PORTION
 OF THE SIDE, STORE CUSTOMERS ARRIVING VIA BICYCLE WILL
 LOOK FOR BICYCLE PARKING CLOSE TO THE ENTRANCE OF THE
 STORE THEY ARE VISITING. IF NOT BICYCLE FACILITY IS
 IMMEDIATELY AVAILABLE, THE USER WILL CHAIN THEIR
 BICYCLE TO LIGHT POLES, TREES, ETC., AND OFTEN BLOCK
 THE PEDESTRIAN NETWORK. ON-STREET BICYCLE PAD
 DIMENSIONS MUST BE CLEARLY SHOWN ON THE PLANS SO THAT
 STAFF CAN VERIFY THAT THERE IS SUFFICIENT ROOM AND THAT
 SIDEWALKS ARE NOT BLOCKED. THE PADS MUST INCLUDE THE
 RACK(S) AND THE DIMENSIONS FROM THE RACKS TO THE EDGE
 OF THE PAD. FOR CLARITY THIS DETAIL SHALL BE PROVIDED
 AT A BIGGER SCALE. NOTE: THE HARDSCAPE PLAN SHOWS
 ON-STREET BICYCLE RACKS; HOWEVER, NO DIMENSIONS ARE
 PROVIDED TO VERIFY THE COMMENTS ABOVE.
  
 37) REPEAT COMMENT: PROVIDE THE DIMENSIONS FROM THE
 MICRO MOBILITY STATIONS TO THE PROPOSED PLAZA LANDSCAPE
 AREAS SO STAFF CAN VERIFY THE PEDESTRIAN CLEARANCES.
 **** THE DIMENSIONS WERE NOT PROVIDED SO STAFF IS
 UNABLE TO VERIFY THE PEDESTRIAN CLEARANCE.
  
 LANDSCAPE
  
 38) UPDATED COMMENT: THE ARCHITECTURAL, LANDSCAPE AND
 CIVIL PLANS DO NOT SHOW THE SAME BASE PLANTING
 CONDITIONS FOR THE COLUMNS ALONG PINEWOOD. ALL OF THE
 COLUMNS NEED TO HAVE THE BASE PLANTINGS.
  
 39) PUBLIC OPEN SPACE CALCULATION ON SHEET A102.0
 COUNTS MORE AREA THAN IS DEFINED AS PUBLIC OPEN SPACE.
 THE BREAKDOWN ON SHEET L1.02 NEEDS TO BE PROVIDED ON
 SHEET A102.0 SO THAT IT IS CLEAR THAT THERE IS 10,000+
 SF OF COMPLIANT PUBLIC OPEN SPACE.
  
 WAIVERS/VARIANCES
  
 40) THE MAXIMUM HORIZONTAL DIMENSION OF A BUILDING
 WITHIN THE MIXED USE DISTRICTS IS 250 FEET. BUILDING A
 EXCEEDS THIS ON ALL FRONTAGES. PLEASE PROVIDE THE FULL
 DIMENSION OF LEVEL 2 ON ALL ELEVATIONS AS THIS IS THE
 LARGEST FLOORPLATE. **** VARIANCE REQUIRED.
  
 41) THE MAXIMUM LOT WIDTH FOR FLEX BUILDINGS IS 200
 FEET AND TOWER BUILDINGS IS 250 FEET. THE LOT
 CONTAINING BUILDINGS A AND B EXCEEDS THIS BASED ON THE
 ABANDONMENT OF PINEWOOD AND NORTHWOOD ROAD AND THE
 BLOCK NO LONGER BOUNDED ON ALL SIDES BY STREETS OR RR.
 **** VARIANCE REQUIRED.
  
 42) THE ADDITIONAL ABANDONMENT OF PINEWOOD AND
 NORTHWOOD ROAD RESULTS IN EXCEEDING THE MAXIMUM BLOCK
 LENGTH AND PERIMETER DIMENSION. PROVIDE THE PERIMETER
 DIMENSION OF THE PARCEL THAT CONTAINS BUILDINGS A AND
 B. **** VARIANCE REQUIRED.
  
 43) THE NMUD REGULATIONS LIMIT THE TOWER FLOOR PLATE TO
 30,000 SQUARE FEET FOR ANY SINGLE FLOORPLATE WITH AND
 AVERAGE FLOORPLATE OF UP TO 20,000 SQUARE FEET. THE
 MAXIMUM TOWER FLOORPLATES ARE SHOWN AT 45,450 SQUARE
 FEET. THE NMUD FLOOR PLATE AVERAGE ONLY APPLIES TO THE
 TOWER PORTION OF BUILDINGS WITHIN THE CORE SUBDISTRICT.
 **** VARIANCE REQUIRED.
  
 44)THE ACTIVE USE LINER REQUIRED BY SECTION
 94-209.J.1.G.II. REQUIRED FOR THE FULL LENGTH OF THE
 GROUND FLOOR IS NOT ACHIEVED FOR THE AREAS LISTED
 BELOW. **** VARIANCES REQUIRED.
  
 A. BUILDING A ALONG 25TH STREET AT THE FIRE COMMAND
 ROOM. PROVIDE THE DIMENSION OF THIS AREA ALONG 25TH
 STREET.
 B. BUILDING A ALONG THE GARDEN PLAZA AT THE STAIRS.
 PROVIDE THE DIMENSION OF THIS AREA ALONG THE SOUTH SIDE
 OF THE STAIRS AS WELL AS THE SOUTH SIDE OF THE ADJACENT
 RETAIL AREA.
 C. BUILDING B ALONG 23RD STREET AT THE BOH AND TRASH
 ROOM. PROVIDE THE DIMENSION OF THIS AREA ALONG 23RD
 STREET.
  
 45) UPDATED COMMENT: SECTION 94-209.E.2.B.I. REQUIRES
 THAT ALL LEVELS OF THE PARKING GARAGE MUST BE SCREENED
 BY A LINER BUILDING CONTAINING A MINIMUM DEPTH OF 20
 FEET OF HABITABLE SPACE. THIS IS NOT MET ALONG THE FULL
 LENGTH OF 25TH STREET. **** A VARIANCE FROM THIS CODE
 REQUIREMENT IS NEEDED. PLEASE PROVIDE THE DIMENSION FOR
 PARKING LEVELS 1.5 AND 2, MEASURED FROM THE WEST SIDE
 OF THE CORRIDOR TO THE WESTERN BUILDING WALL. ALSO
 PROVIDE THE DIMENSION FORM THE WEST SIDE OF THE
 CORRIDOR TO THE WEST WALL OF UNIT 18. THE REMAINDER IS
 THE UNSCREENED PORTION OF THE GARAGE AND WILL BE THE
 WAIVER THAT YOU ARE REQUESTING FROM THE 100% SCREENING
 REQUIREMENT. PLEASE ALSO PROVIDE THE DEPTH OF UNIT 18
 FROM 25TH STREET SO THAT STAFF CAN VERIFY THAT YOU ARE
 MEETING THE 20 FOOT OF HABITABLE SPACE AND THAT ANOTHER
 WAIVER IS NOT REQUIRED.
  
 46) UPDATED COMMENT: SECTION 94-209.2.A.IV. REQUIRES
 THAT ALL PARKING GARAGES MUST HAVE DIRECT PEDESTRIAN
 ACCESS TO A PUBLIC WALKWAY. NONE OF THE PARKING SPACES
 APPEAR TO HAVE DIRECT ACCESS TO A PUBLIC WALKWAY. THE
 PP AND CRA SPACES ON THE NORTH SIDE OF THE GARAGE LEVEL
 1.5 USE AN ELEVATOR THAT THE FUTURE PUBLIC ACCESS
 EASEMENT ALONG THE NEW PINEWOOD. THE CRA SPACE ON THE
 SOUTH SIDE OF THE GARAGE LEVEL 1.5 HAVE EMERGENCY
 ACCESS TO THE RAILROAD, WHICH IS NOT A PUBLIC WALKWAY.
 EVEN UPON MODIFICATION TO ACCOMMODATE ADA, THESE USERS
 WILL GO THROUGH THE LOBBY PRIOR TO GETTING TO A PUBLIC
 ACCESS EASEMENT AREA (PASEO OR PINEWOOD). WHILE THE
 RESIDENTS THAT HAVE ACCESS TO THE LINER UNIT CORRIDOR
 WILL HAVE ACCESS TO THE JUMP LOBBIES, WHICH ARE
 DIRECTLY ON A PUBLIC WALKWAY, IT IS UNCLEAR IF THE
 RESIDENTS OF THE TOWER WILL HAVE ACCESS TO THESE AREAS
 AS WELL. THE RESIDENT ONLY, LIMITED ACCESS TO THE JUMP
 LOBBIES DOES NOT QUALIFY AS THE GARAGES HAVING DIRECT
 ACCESS. **** A WAIVER OF THIS CODE PROVISION IS
 REQUIRED. AS PART OF THE WAIVER, ALL UNIT OWNERS WOULD
 NEED TO BE ABLE TO UTILIZE THE ELEVATORS AND STAIRS
 THAT ACCESS THE JUMP LOBBIES.
  

Review Stop Z ZONING
Rev No 3 Status F Date 06-28-2022 Cont ID  
Sent By eschneid Date 06-28-2022 Time 16:38 Rev Time 20.00
Received By eschneid Date 06-23-2022 Time 08:27 Sent To  
Notes
2022-06-28 16:39:13CASE NO. 1895 - MAY 27, 2022 RESUBMITTAL
 NORTHWOOD COMMONS - NMUD ANCHOR SITE
 BROADWAY & 24TH STREET
  
 - CONTACT ERIC SCHNEIDER @ (561) 822-1446,
 [email protected]
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF THREE
 (3) PAPER COPIES AND AN ELECTRONIC COPY IN .PNG FORMAT
 OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS
 TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL
 COMMENTS.
  
 - ONCE THE COMMENTS ARE RESUBMITTED AND DEEMED
 SUFFICIENTLY ADDRESSED, THE CASE WILL BE SCHEDULED FOR
 THE NEXT AVAILABLE PLANNING BOARD MEETING.
  
 - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT
 RECEIVED A RESPONSE TO THE COMMENTS WITHIN 60 DAYS FROM
 THE DATE OF THESE COMMENTS (BY SEPTEMBER 28, 2022), THE
 PLANNING DIVISION MAY NOTIFY THE APPLICANT THAT THE
 CASE IS CONSIDERED WITHDRAWN. ANY FURTHER ACTION SHALL
 REQUIRE A NEW DEVELOPMENT APPLICATION.
  
 - PLEASE NOTE THAT PREVIOUSLY ISSUED COMMENTS CONTINUE
 WERE NOT ADDRESSED, SO THE APPLICANT IS ASSESSED A
 RESUBMITTAL FEE. SUCH FEE WILL BE 20% OF THE ORIGINAL
 APPLICATION FEE ($600).
  
 - PUBLIC HEARING NOTIFICATION SIGNAGE SHALL BE POSTED
 IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION
 94-39(I)(5) OF THE ZONING AND LAND DEVELOPMENT
 REGULATIONS.
  
 THE DSI RESUBMITTAL ORIGINALLY COINCIDED WITH A CODE
 TEXT CHANGE TO THE NMUD DEVELOPMENT REGULATIONS. IT IS
 ANTICIPATED THAT A CODE AMENDMENT FOR THE
 VARIANCE/WAIVER PROCESS WILL BE ADOPTED BY THE CITY
 COMMISSION IN JULY. STAFF HAS NOTED AREAS WHERE THE NEW
 VARIANCE/WAIVER PROCESS IS PREFERABLE TO AN NMUD TEXT
 CHANGE. THERE ARE SOME AREAS WHERE THE NMUD TEXT WILL
 NEED TO BE AMENDED REGARDLESS SUCH AS TO THE REGULATING
 MAPS.
  
 1) THE PLANS SHOW DISCREPANCIES FOR THE ULTIMATE
 OWNERSHIP AND BOUNDARY STATUS OF THE BROADWAY
 EXTENSION. THE CIVIL AND LANDSCAPE PLANS SHOW A
 DEDICATED RIGHT-OF-WAY, WHILE THE SITE PLAN SHOWS IT AS
 PRIVATE PROPERTY. THERE ARE CONFLICTING CODE
 IMPLICATIONS FOR HOW THE BROADWAY EXTENSION IS
 CLASSIFIED. THE PLANNING COMMENTS ARE BASED ON THE
 BROADWAY EXTENSION BEING PRIVATE PROPERTY WITH AN
 ACCESS EASEMENT. THE ENGINEERING DEPARTMENT IS STILL
 DETERMINING THE MOST APPROPRIATE OPTION.
  
 2) THE DEMOLITION PLAN SHOWS THAT THE "LOT 23" BUILDING
 AT THE SOUTHEAST CORNER OF THE SITE WILL STILL BE
 REMOVED AS PART OF THE PROJECT. THE PLANS SHOW A NEW
 BUILDING IN THIS LOCATION; HOWEVER, THE DETAILS OF THIS
 BUILDING, TO INCLUDE DIMENSIONS, SETBACKS, HEIGHT, FULL
 ELEVATIONS, ETC. HAVE NOT BEEN PROVIDED. THIS WOULD BE
 BUILDING D ON THE PLANS. SINCE IT IS IN THE NORTHWOOD
 ROAD HISTORIC DISTRICT, IT NEEDS TO BE APPROVED BY THE
 HISTORIC PRESERVATION BOARD.
  
 3) UPDATED COMMENT: PROVIDE A REVISED TRAFFIC
 PERFORMANCE STANDARDS APPROVAL LETTER FROM THE PALM
 BEACH COUNTY TRAFFIC DIVISION FOR THE SCOPE OF THE
 PROPOSED DEVELOPMENT BASED ON THE UPDATED PLANS AND
 TRAFFIC IMPACT ANALYSIS (73,990 SF RETAIL AND 364 DU).
 THE TRAFFIC LETTER NEEDS TO REFLECT THAT THE ANCHOR
 SITE PROJECT BOUNDARIES ARE NOT VACANT, BUT THAT THE
 CONTAIN BUILDINGS (3) AS SHOWN ON THE SURVEY. *** THE
 LATEST TIA SHOWS THE NEW USE MIX HAVING LESS IMPACT
 THAN WHAT THE CURRENT TPS LETTER SHOWS; THEREFORE, THE
 UPDATED TPS LETTER IS PRIOR TO THE SCHEDULING OF THE
 CITY COMMISSION HEARING.
  
 4) REPEAT COMMENT: PROVIDE A PREDETERMINATION LETTER
 FROM FDOT FOR THE IMPROVEMENTS WITHIN THE FDOT
 RIGHTS-OF-WAY OF BROADWAY AND 24TH AND 25TH STREETS
 ADJACENT TO THE PROJECT. *** THIS IS REQUIRED PRIOR TO
 SCHEDULING A PLANNING BOARD HEARING.
  
 5) REPEAT COMMENT: SECTION 94-209.J.1.C REQUIRES THAT
 PROJECTS WITH THREE OR MORE DISTINCTLY SEPARATE
 BUILDINGS HAVE SUBSTANTIALLY DIFFERENT FRONT
 ELEVATIONS. SUBSTANTIALLY DIFFERENT FRONT ELEVATIONS
 SHALL INCLUDE BUT NOT BE LIMITED TO VARIATIONS IN
 FENESTRATION, MATERIAL, MASSING AND COLOR. BUILDINGS B
 AND C DO NOT HAVE SUBSTANTIALLY DIFFERENT FRONT
 ELEVATIONS FROM EACH OTHER IN ACCORDANCE WITH THE CODE
 REQUIREMENTS. BUILDING D WILL NEED TO COMPLY WITH THIS
 REQUIREMENT AS WELL. PLEASE NOTE THAT THE BUILDING C
 ELEVATIONS HAVE CHANGED FROM THOSE PRESENTED TO THE
 HISTORIC PRESERVATION BOARD AND WILL REQUIRE APPROVAL
 FROM THE HISTORIC PRESERVATION DIVISION.
  
 6) BUILDING B: SHEET A0.03 PROJECT DATA AND SHEET A405
 SHOW DIFFERING HEIGHTS FOR THE BUILDING LEVELS. ALL
 PLANS MUST SHOW CONSISTENT, ACCURATE INFORMATION. WHAT
 IS LEVEL 1.5 LISTED ON THE DATA TABLE?
  
 7) BUILDING C: SHEET A0.03 PROJECT DATA AND SHEET A406
 SHOW DIFFERING HEIGHTS FOR THE BUILDING LEVELS. ALL
 PLANS MUST SHOW CONSISTENT, ACCURATE INFORMATION.
  
 8) THE MINIMUM UNIT SIZE IN NMUD IS 550 SF. BUILDING A
 LEVEL 3 UNITS 5 AND 19, LEVEL 4 UNITS 9 AND 23, AND
 LEVELS 5 THROUGH 9 UNITS 10 AND 24 DO NOT MEET THIS
 MINIMUM.
  
 9) REPEAT COMMENT: PROVIDE THE HEIGHTS OF THE ROOFTOP
 MECHANICAL EQUIPMENT AND THE MECHANICAL EQUIPMENT
 SCREENING HEIGHTS FOR ALL BUILDINGS SO THAT STAFF CAN
 VERIFY THAT THE EQUIPMENT IS SCREENED IN ACCORDANCE
 WITH THE NMUD REQUIREMENTS. THE PARAPET HEIGHTS SHOWN
 (STAFF HAD TO SCALE THE DRAWINGS) FOR BUILDINGS B AND C
 WILL NOT SCREEN THE FULL HEIGHT OF THE A/C UNITS WHERE
 THEY ARE LOCATED ON THE ROOF PLANS.
  
 10) UPDATED COMMENT: THE VISIBILITY TRIANGLE
 INFORMATION WAS NOT PROVIDED FOR THE INTERSECTION OF
 THE BROADWAY EXTENSION AND NORTHWOOD ROAD. IT APPEARS
 THAT THERE MAY BE A CONFLICT HERE WITH PROPOSED
 BUILDING D. NOTE: THE CITY?S TRAFFIC ENGINEER IS
 PERMITTED TO REVIEW THE SPECIFIC INTERSECTION
 CONFIGURATION, SPECIFICALLY THE EXISTING BULB OUTS AND
 DETERMINE IF THE PROPOSED BUILDING D PLACEMENT DOES NOT
 PRESENT A VISIBILITY HAZARD.
  
 11) UPDATED COMMENT: THE MAXIMUM LOT WIDTH FOR FLEX
 BUILDINGS IS 200 FEET AND TOWER BUILDINGS IS 250 FEET.
 THE LOT CONTAINING BUILDINGS A AND B EXCEEDS THIS BASED
 ON THE ABANDONMENT OF PINEWOOD AND NORTHWOOD ROAD AND
 THE BLOCK NO LONGER BOUNDED ON ALL SIDES BY STREETS OR
 RR. **** POSSIBLE NEW VARIANCE/WAIVER PROCESS INSTEAD
 OF CODE CHANGE.
 12) THE ADDITIONAL ABANDONMENT OF PINEWOOD AND
 NORTHWOOD ROAD RESULTS IN EXCEEDING THE MAXIMUM BLOCK
 LENGTH AND PERIMETER DIMENSION. **** POSSIBLE NEW
 VARIANCE/WAIVER PROCESS INSTEAD OF CODE CHANGE.
  
 13) THE PROPOSAL IS NOW TO ABANDON THE REMAINDER OF
 PINEWOOD AND NORTHWOOD ROAD, WEST OF BROADWAY. THE
 PROPERTY AND SETBACK LINES SHOWN ON THE PLANS NEED TO
 BE ADJUSTED TO REFLECT THE NEW PROPERTY BOUNDARIES.
  
 14) UPDATED COMMENT: STAFF IS HAVING DIFFICULTY
 VERIFYING THAT THE TOWER AND THE ARCHITECTURAL FEATURES
 ARE NOT ENCROACHING ON THE BROADWAY SETBACK. THE PLAN,
 SECTION AND ELEVATION DRAWINGS SHOW DIFFERENCES
 INCLUDING THAT THE TOWER BOTH IS AND IS NOT SET BACK 15
 FEET FROM THE EDGE OF THE PODIUM. BETTER, DIMENSIONED
 GRAPHICS AT A LARGER SCALE NEED TO BE PROVIDED TO
 VERIFY THAT THERE IS NO SETBACK ENCROACHMENT.
  
 15) UPDATED COMMENT: SHEET A0.02 CONTINUES TO LIST THE
 GROSS LAND AREA AS 144,250 SQUARE FEET. SHEET L1.01 NOW
 LISTS THE SITE AS HAVING 128,027.
  
 A. THE SITE NOW HAS TWO DEVELOPMENT PARCELS (ONE
 INCLUDING BUILDINGS A, B AND D AND ONE WITH BUILDING
 C), EACH MUST INDEPENDENTLY MEET THE LANDSCAPE, OPEN
 SPACE, STREETSCAPE, PERVIOUS, ETC. REQUIREMENTS OF
 NMUD.
 B. THE LAND AREA FOR EACH PARCEL NEEDS TO INCLUDE THE
 ABANDONED RIGHTS-OF-WAY. NOTE THAT THE BROADWAY
 EXTENSION AND NEW PINEWOOD WILL NOT BE SEPARATE
 PARCELS, BUT RATHER ACCESS EASEMENTS.
  
 16) BUILDING FRONTAGE (NOTE: THE COMMENTS BELOW ARE
 BASED ON ALL OF THE STREETS WITHIN THE PARCEL
 CONTAINING BUILDINGS A, B AND D REMAINING PRIVATE
 EASEMENTS):
  
 A.THE NMUD REGULATIONS REQUIRE THAT A MINIMUM OF 50%
 BUILDING FRONTAGE IS PROVIDED ALONG 23RD STREET WITHIN
 THE MINIMUM AND MAXIMUM SETBACK. THE LINEAR DIMENSION
 ALONG 23RD STREET IS 360 FEET, SO A MINIMUM BUILDING
 FRONTAGE OF 180 FEET IS REQUIRED. A SIGNIFICANT PORTION
 OF BUILDING B EXCEEDS THE 20-FOOT MAXIMUM SETBACK,
 WHICH IS NOT PERMITTED TO COUNT TOWARD THE BUILDING
 FRONTAGE. STAFF CALCULATES THE TOTAL BUILDING FRONTAGE
 ALONG 23RD STREET AS ONLY 117 FEET, WHICH CONSISTS OF
 THE PORTION OF BUILDING A FRONTING PLAZA 4, THE
 PORTIONS OF BUILDING B THAT MEET THE MAXIMUM SETBACK
 AND BUILDING D. THIS COULD BE SOLVED BY MOVING THE
 BUILDING B TO THE SOUTH.
 B. BUILDING A FRONTAGE COMPLIES ON 25TH STREET AND
 BROADWAY.
 C. THE NMUD REGULATIONS REQUIRE THAT A MINIMUM OF 90%
 BUILDING FRONTAGE IS PROVIDED ALONG NORTHWOOD ROAD
 WITHIN THE MINIMUM AND MAXIMUM SETBACK. THE EXISTING
 BUILDING D DOES NOT PROVIDE ENOUGH FRONTAGE. SINCE THIS
 AREA IS NOT WITHIN THE CORE SUBDISTRICT, A VARIANCE
 WOULD BE REQUIRED.
 D. BUILDING C FRONTAGE COMPLIES ON NORTHWOOD ROAD, 24TH
 STREET AND BROADWAY.
  
 17) UPDATED COMMENT: THE NMUD REGULATIONS REQUIRE THAT
 THE PRIMARY ENTRANCE TO THE UPPER LEVELS OF A MIXED-USE
 BUILDING SHALL BE FROM A PUBLIC RIGHT-OF-WAY. THE
 PRIMARY ENTRANCE TO THE UPPER LEVELS OF BUILDING B IS
 SHOWN FROM NEW PINEWOOD, WHICH IS NOT A PUBLIC
 RIGHT-OF-WAY, BUT RATHER AN EASEMENT. THIS CAN BE
 SOLVED BY HAVING A DOORWAY TO THE LOBBY FACING 23RD
 STREET.
  
 18) UPDATED COMMENT: THE NMUD REGULATIONS CURRENTLY
 LIMIT THE TOWER FLOOR PLATE TO 30,000 SQUARE FEET FOR
 ANY SINGLE FLOORPLATE WITH AND AVERAGE FLOORPLATE OF UP
 TO 20,000 SQUARE FEET. THE MAXIMUM TOWER FLOORPLATES
 ARE SHOWN AT 36,475 SQUARE FEET, THE MAXIMUM FLOORPLATE
 WILL BE NO GREATER THAN 40,000 SQUARE FEET. THE NMUD
 FLOOR PLATE AVERAGE ONLY APPLIES TO THE TOWER PORTION
 OF BUILDINGS WITHIN THE CORE SUBDISTRICT. PROVIDE THE
 AVERAGE FLOORPLATE OF FLOORS L-4 THROUGH L-9 AS THESE
 ARE THE ONLY ONES THAT APPLY. **** POSSIBLE NEW
 VARIANCE/WAIVER PROCESS INSTEAD OF CODE CHANGE.
  
 DESIGN STANDARDS
  
 19) UPDATED COMMENT: ACTIVE USE STANDARDS
  
 A. THE STOREFRONT GLAZING CALCULATIONS WERE NOT
 ACCURATELY PROVIDED. SECTION 94-209.J.1.G.I.4. REQUIRES
 THAT STOREFRONTS HAVE A TRANSPARENT GLAZED AREA OF NOT
 LESS THAN 70 PERCENT OF THE GROUND LEVEL FACADE AREA.
 THE TABLE AND DRAWINGS PROVIDED FOR BUILDING A DO NOT
 PROVIDE THE FACADE AREA FOR ONLY THE GROUND FLOOR THAT
 CAN THEN BE USED TO DETERMINE IF THE PROVIDED GROUND
 GLAZING LEVEL SQUARE FOOTAGE COMPLIES WITH THE 70%
 MINIMUM.
 B. THE REQUIRED STOREFRONT GLAZING CALCULATIONS FOR
 BUILDINGS B, C AND D WAS NOT PROVIDED.
 C. THE ACTIVE USE LINER REQUIRED BY SECTION
 94-209.J.1.G.II. IS REQUIRED TO BE ON EACH LEVEL OF
 EACH BUILDING FRONTAGE ABOVE THE GROUND FLOOR.
 ADDITIONALLY, SECTION 94-209.E.2.B.I. REQUIRES A 20
 FOOT DEEP LINER ALONG 24TH STREET. **** POSSIBLE NEW
 VARIANCE/WAIVER PROCESS INSTEAD OF CODE CHANGE.
  
 20) UPDATED COMMENT: NO FENESTRATION WAS PROVIDED ALONG
 THE GROUND FLOOR OF THE BUILDING ALONG THE RR AS
 REQUIRED BY SECTION 94-209.J.I. **** POSSIBLE NEW
 VARIANCE/WAIVER PROCESS INSTEAD OF CODE CHANGE.
  
 21) UPDATED COMMENT: SECTION 94-209.J.A. REQUIRES THE
 PROVISION OF PLANAR BREAKS. WHILE THE PLANS APPEAR TO
 SHOW ARTICULATION ON THE FACADES THAT REFLECT PLANAR
 BREAKS, THE PLANS DO NOT INCLUDE DEPTH DIMENSIONS FOR
 THE VARIOUS FEATURES, NOR IS A TABLE PROVIDED TO SHOW
 THAT THE CUMULATIVE HORIZONTAL LENGTH OF ALL PLANAR
 BREAKS SHALL BE GREATER THAN OR EQUAL TO 20% OF EACH
 BUILDING FRONTAGE EXCEEDING 150 FEET FOR BUILDINGS A, B
 AND C HAVE BEEN MET.
  
 22) UPDATED COMMENT: PROVIDE THE DIMENSIONS OF THE
 PROJECTIONS AND ENCROACHMENTS (EX. BALCONIES AND OTHER
 ARCHITECTURAL FEATURES) ON THE PLANS AND ELEVATIONS SO
 THAT STAFF CAN VERIFY COMPLIANCE WITH THE NMUD
 REGULATIONS. THIS HAS NOT BEEN PROVIDED FOR ALL OF THE
 FACADES ON ALL THE BUILDINGS.
  
 23) THE SITE PLANS DO NOT SHOW ALL THE UTILITIES - EX.
 FIRE HYDRANT MISSING AT SOUTHWEST CORNER OF BUILDING C.
 ALL PLANS MUST SHOW ACCURATE CONDITIONS.
  
 STREETSCAPE
  
 24) REPEAT COMMENT: NO DETAILS WERE PROVIDED ON THE
 SITE LIGHTING TO VERIFY COMPLIANCE WITH THE NMUD
 REGULATIONS. *** THIS IS REQUIRED PRIOR TO SCHEDULING A
 PLANNING BOARD HEARING SO THAT STAFF CAN VERIFY THAT
 THERE IS NO INCONSISTENCY WITH THE CODE REQUIREMENTS.
 THE MIXED-USE DEVELOPMENT REGULATIONS REQUIRE THAT
 STREETLIGHTS BE PROVIDED ALONG PUBLIC RIGHTS-OF-WAY
 ADJACENT TO THE SITE. CLEARLY SHOW THE PEDESTRIAN
 ORIENTED LIGHTING FOR THE SIDEWALKS ALONG THE SITE ON
 THE PLANS. THE LANDSCAPE AND CIVIL PLANS INDICATE THAT
 SOME EXISTING LIGHTS WILL REMAIN, BUT NOT ALL OF THE
 SITE IS COVERED.
  
 25) UPDATED COMMENT: THANK YOU FOR INCLUDING A NOTE
 STATING WHERE THE SIDEWALKS OR WALKWAYS CROSS THE
 DRIVEWAY ENTRANCES TO THE PARKING FACILITIES, LOADING
 AREAS, OR STREETS (BOTH PRIVATE AND PUBLIC), THE
 SIDEWALK OR WALKWAY IS CONTINUOUS AND REMAINS AT A
 CONSTANT LEVEL; HOWEVER, THIS NEEDS TO BE SHOWN IN
 CROSS-SECTION (OR OTHER GRAPHIC METHOD) ON THE PLANS,
 PREFERABLY THE CIVIL PLANS.
  
 26) REPEAT COMMENT: THE ARCHITECTURAL PLANS MUST SHOW
 THE MEDIANS IN BROADWAY THAT ARE SHOWN ON THE CIVIL AND
 LANDSCAPE PLANS. THE LANE WIDTH DIMENSIONS NEED TO BE
 PROVIDED AT THESE LOCATIONS.
  
 27) UPDATED COMMENT: ROADWAY CROSS-SECTIONS.
  
 A. THERE ARE DISCREPANCIES BETWEEN SECTION A-A ON SHEET
 C2.05 AND THE SAME LOCATION ON SHEET A-301. SHEET A-301
 SHOWS THE 10-FOOT SIDEWALK DIMENSION EXTENDING INTO THE
 PARKING SPACE. THE SECTION A-A DOES NOT MATCH AND
 EXCEEDS THE 60 FEET BETWEEN BUILDINGS.
 B. SECTION B-B ON SHEET C2.05 EXCEEDS THE 60 FEET
 BETWEEN BUILDINGS AND CALLS OUT LANDSCAPING WHERE IT IS
 ACTUALLY PAVED AREA.
 C. THE DIMENSIONS PROVIDED ON SECTION C-C ON SHEET
 A2.05 DO NOT MATCH THE DIMENSIONS PROVIDED ON SHEET
 A-301. THERE IS ONE FOOT LESS WIDTH SHOWN ON SECTION
 C-C. ALL PLANS NEED TO SHOW THE SAME, ACCURATE
 CONDITIONS. ADDITIONALLY, SECTION C-C DOES NOT DEPICT
 WHAT IS OCCURRING IN THE ROW BETWEEN THE CURB AND
 PROPERTY LINE TO VERIFY THAT THE MINIMUM 5-FOOT WIDE
 UNOBSTRUCTED SIDEWALK HAS BEEN PROVIDED.
 D. THE DIMENSIONS PROVIDED ON SECTION D-D ON SHEET
 A2.05 DO NOT MATCH THE DIMENSIONS PROVIDED ON SHEET
 A-301. THERE IS ONE FOOT LESS WIDTH SHOWN ON SECTION
 D-D. ALL PLANS NEED TO SHOW THE SAME, ACCURATE
 CONDITIONS.
 E. SECTION E-E ON SHEET A2.05 DOES NOT ACCURATELY
 DEPICT WHAT IS OCCURRING AT THIS LOCATION. EX. TREE
 GRATE NOT SHOWN.
 F. THE DIMENSIONS PROVIDED ON SECTION F-F ON SHEET
 A2.05 DO NOT MATCH THE DIMENSIONS PROVIDED ON SHEET
 A-301. THERE IS ONE FOOT MORE WIDTH SHOWN ON SECTION
 F-F.
 G. SECTION G-G ON SHEET A2.05 DOES NOT ACCURATELY
 DEPICT WHAT IS OCCURRING AT THIS LOCATION. EX.
 LANDSCAPE STRIP NOT SHOWN.
 H. SECTION H-H ON SHEET A2.05 DOES NOT ACCURATELY
 REFLECT THE SITE PLAN OR OTHER CIVIL PLANS.
 ADDITIONALLY, THE STATUS OF THE BROADWAY EXTENSION HAS
 NOT BEEN DETERMINED BY THE CITY, SO THE PROPERTY LINES
 WILL BE INCORRECT. BUILDING D DOES NOT COMPLY WITH ANY
 STREETSCAPE REQUIREMENTS, TO INCLUDE THE ROADWAY
 CROSS-SECTION REQUIREMENTS.
  
 28) THE EXTENSION OF BROADWAY AND CONCURRENT CLOSING OF
 THE VEHICULAR CONNECTIONS BETWEEN BROADWAY AND PINEWOOD
 RESULTS IN MORE TRAFFIC BEING ROUTED TO 23RD STREET
 SOUTH OF THE PROJECT. CURRENTLY 23RD STREET WEST OF THE
 BROADWAY EXTENSION IS ONE-WAY WEST WITH A BULB OUT TO
 RESTRICT THE EASTWARD FLOW OF TRAFFIC. THIS WILL NEED
 TO BE REMOVED AND THIS SECTION OF 23RD STREET REOPENED
 TO TWO-WAY TRAFFIC, WITH APPROPRIATE TRAFFIC MARKINGS.
  
 PARKING/LOADING
  
 29) PROVIDE VEHICLE TURNING RADIUS DRAWING FOR MOVING
 TRUCKS INTO/OUT OF THE LOADING AREAS.
  
 30) UPDATED COMMENT: ALL LEVELS OF THE PARKING GARAGE
 MUST BE SCREENED BY A LINER BUILDING CONTAINING A
 MINIMUM DEPTH OF 20 FEET OF HABITABLE SPACE. THIS IS
 NOT MET ALONG THE FULL LENGTH OF 25TH STREET. ****
 POSSIBLE NEW VARIANCE/WAIVER PROCESS INSTEAD OF CODE
 CHANGE. IF DONE AS A CODE TEXT CHANGE, THE SPECIFIC
 CODE LANGUAGE MUST INCLUDE THE PROVISION OF
 ARCHITECTURAL TREATMENT AND PLANAR BREAKS TO VARY THE
 FACADE IN ORDER TO CONCEAL THE NON-HABITABLE PARKING.
  
 31) THERE ARE FOUR PARKING SPACES IN THE NORTHEAST
 CORNER OF LEVEL 1.5 THAT DO NOT CONTAIN A COLOR OR
 LABELS AND ONE SPACE IN THE SOUTH PORTION THAT DOES NOT
 CONTAIN A LABEL.
  
 32) UPDATED COMMENT: DEAD END PARKING ROWS FOR
 UNASSIGNED, TO INCLUDE PUBLIC, PARKING ARE NOT
 PERMITTED WITHOUT A TURNAROUND SPACE. THE DEAD-END
 PARKING ROW ON LEVEL 1.5 MUST CONTAIN A TURNAROUND
 SPACE. THIS REMOVED SPACE MUST BE REFLECTED ON ALL THE
 PARKING TABLES.
  
 33) UPDATED COMMENT: SECTION 94-209.2.A.IV. REQUIRES
 THAT ALL PARKING GARAGES MUST HAVE DIRECT PEDESTRIAN
 ACCESS TO A PUBLIC WALKWAY. THE PUBLIC ELEVATORS THAT
 ARE NOW DESIGNATED ON THE PLAN DO NOT PROVIDE ACCESS TO
 A PUBLIC WALKWAY, BUT RATHER THE INTERNAL PRIVATE
 ROADWAY NETWORK. **** POSSIBLE NEW VARIANCE/WAIVER
 PROCESS INSTEAD OF CODE CHANGE.
  
 34) UPDATED COMMENT: THANK YOU FOR PROVIDING THE COLUMN
 LOCATIONS ON THE GARAGE LEVELS:
  
 A. PLEASE PROVIDE A DIAGRAM SHOWING HOW THE ?FINS?
 SHOWN ON EACH SIDE OF EACH COLUMN INTERACT WITH THE
 PARKING SPACES THAT THEY ARE LOCATED ADJACENT TO. IN
 MANY INSTANCES THESE FINS EXTEND INTO THE PARKING
 SPACES AND DRIVE AISLES MAKING THEM NO LONGER COMPLIANT
 WITH CODE MINIMUMS.
 B. THE COLUMNS ARE SHOWN EXTENDING ON LEVELS 3 AND
 ABOVE. SOME OF THE COLUMNS ARE NO LONGER WITHIN THE
 BUILDING AND VIOLATE THE TOWER SETBACK, WHICH IS NOT
 PERMITTED. ADDITIONALLY, THE EXTERIOR COLUMNS, EVEN
 WHERE THE SETBACK IS NOT VIOLATED, ARE NOT SHOWN ON THE
 ELEVATION DRAWINGS AND RENDERINGS.
  
 35) UPDATED COMMENT: THE PARKING STALL DETAIL WAS
 REMOVED FROM THE PLANS AND NOT REPLACED. PROVIDED A
 CITY CODE COMPLIANT PARKING DETAIL FOR ALL CONDITIONS.
  
 36) REPEAT COMMENT: THE PARKING PROVIDED TABLES SHALL
 CLEARLY SEPARATE THE PROVIDE ADA SPACES FROM THE TOTAL
 PROVIDED SPACES FOR EACH CATEGORY. THE CURRENT LINE
 ITEM FOR L2 PARKING GARAGE MAKE IT LOOK LIKE THERE ARE
 ADA SPACES IN ADDITION TO THE REGULAR SPACES, WHICH
 OVERSTATES THE NUMBER OF PROVIDED PARKING SPACES.
  
 37) THERE ARE 26 PARKING ON-STREET PARKING SPACES, NOT
 25 AS LISTED.
  
 38) UPDATED COMMENT: THE PLANS AND DATA TABLES DO NOT
 CLEARLY SHOW THE PUBLIC PARKING SPACES REQUIRED IN
 ACCORDANCE WITH THE AGREEMENT WITH CRA. THESE NEED TO
 BE A SEPARATE LINE ITEM ON THE TABLES AND A SHOWN WITH
 A SEPARATE MARKING FROM THE REQUIRED RETAIL SPACES.
 STAFF HAS COUNTED THE NUMBER OF SPACES MARKED AS PUBLIC
 PARKING AND IT IS DEFICIENT FOR RETAIL PLUS PUBLIC
 PARKING SINCE ONLY 2 PARKING SPACES IN EXCESS OF THE
 RETAIL REQUIREMENT ARE PROVIDED.
  
 39) REPEAT COMMENT: THE CRA AGREEMENT REQUIRES THAT THE
 DEVELOPER CONSTRUCT PUBLIC PARKING SPACES IN AN AMOUNT
 TO EQUAL 10% OF THE PARKING REQUIRED FOR THE PROJECT.
 WHILE THE PLANS DO NOT CLEARLY DEMONSTRATE WHERE THE
 CRA REQUIRED PARKING SPACES ARE LOCATED, IT APPEARS
 THAT SOME OF THEM ARE INTENDED TO BE LOCATED WITHIN THE
 ON-STREET PARKING SHOWN ON THE PLANS. SINCE THE
 LANGUAGE REQUIRES THAT NEW PARKING SPACES BE
 CONSTRUCTED TO MEET THE CRA REQUIREMENT, PROVIDE AN
 EXISTING PARKING INVENTORY OF THE ON-STREET PARKING
 SPACES. EXISTING PARKING SPACES MAY NOT BE COUNTED AS
 NEWLY CONSTRUCTED SPACES, AND ANY SPACES BEING REMOVED,
 WILL NEED TO BE REPLACED AND MAY NOT BE COUNTED AS
 NEWLY CREATED PARKING SPACES.
  
 40) REPEAT COMMENT: THE PROJECT REQUIRES 15 BICYCLE
 SPACES FOR THE COMMERCIAL PORTION AND 38 BICYCLE SPACES
 FOR THE RESIDENTIAL PORTION. THERE ARE 53 TOTAL
 REQUIRED BICYCLE PARKING SPACES. THIS SHALL BE
 CORRECTLY REFLECTED ON THE PARKING TABLES AND SHOWN ON
 THE PLANS. THE CURRENT PLAN ONLY LISTS 44 REQUIRED
 BICYCLE PARKING SPACES.
  
 41) REPEAT COMMENT: PROVIDE THE DIMENSIONS AND DETAIL
 FOR THE BICYCLE RACKS, INCLUDING THE NUMBER OF SPACES,
 LOCATED IN THE BICYCLE STORAGE ROOM AS WELL AS THE
 DIMENSIONS OF THE ROOM AND THE RACKS IN THE ROOM. THIS
 SHALL BE PROVIDED ON ITS OWN BICYCLE ROOM DETAIL SHEET
 THAT THIS AT A LEGIBLE SCALE.
  
 42) UPDATED COMMENT: ON-STREET BICYCLE FACILITIES ARE
 REQUIRED. THE HARDSCAPE PLAN SHOWS ON-STREET BICYCLE
 RACKS, YET THE ARCHITECTURAL, LANDSCAPE AND CIVIL PLANS
 DO NOT. ALL PLANS MUST SHOW THE SAME CODE COMPLIANT
 CONDITIONS. ON-STREET BICYCLE PAD DIMENSIONS MUST BE
 CLEARLY SHOWN ON THE PLANS SO THAT STAFF CAN VERIFY
 THAT THERE IS SUFFICIENT ROOM AND THAT SIDEWALKS ARE
 NOT BLOCKED. THE PADS MUST INCLUDE THE RACKS AND THE
 DIMENSIONS FROM THE RACKS TO THE EDGE OF THE PAD. FOR
 CLARITY THIS DETAIL SHALL BE PROVIDED AT A BIGGER
 SCALE.
  
 43) UPDATED COMMENT: PROVIDE THE DIMENSIONS FROM THE
 MICRO MOBILITY STATIONS TO THE PROPOSED PLAZA LANDSCAPE
 AREAS SO STAFF CAN VERIFY THE PEDESTRIAN CLEARANCES.
  
 LANDSCAPE
  
 44) THE REQUIRED LANDSCAPE AROUND BUILDING D HAS NOT
 BEEN PROVIDED. THERE DOES NOT APPEAR TO BE ADEQUATE
 ROOM TO INSTALL THIS ALONG THE BROADWAY EXTENSION.
  
 45) THE LANDSCAPE PLANS DO NOT SHOW ALL OF THE PINEWOOD
 AND PASEO SUPPORT COLUMNS. ALL OF THE COLUMNS ALONG
 PINEWOOD NEED TO HAVE THE BASE PLANTINGS.
  
 46) ALL BACK FLOW PREVENTORS MUST BE LOCATED ON PRIVATE
 PROPERTY AND NOT WITHIN THE RIGHT-OF-WAY LANDSCAPE
 STRIP. THE REQUIRED LANDSCAPE NEEDS TO BE PROVIDED
 WHERE THESE WILL NO LONGER EXIST IN THE RIGHT-OF-WAY.
  
 47) THE WATER AND FIRE LINES IN PLAZA IV ARE SHOWN IN
 DIRECT CONFLICT WITH PROPOSED TREES.
  
 48) THE COLUMNS FOR THE SOUTH SIDE OF BUILDING A ARE
 NOT SHOWN ON THE LANDSCAPE PLAN WITHIN PLAZA III AND
 DIRECTLY CONFLICT WITH SOME OF THE PROPOSED TREES.
 ADDITIONALLY, PLEASE REVIEW THE COLUMN ORIENTATION
 DETAILS AS THEY PROGRESS UP THE LEVELS AT THIS LOCATION
 AS THEY CHANGE.
  
 PUBLIC OPEN SPACE
  
 49) THE PROPOSAL TO REDEFINE THE REQUIRED OPEN SPACE AS
 THE PASEO WAS BASED ON THE DESIGNS WITH NO PUBLIC OPEN
 SPACE THAT MET THE CODE DEFINITION OF OPEN TO THE SKY.
 THE NEW DESIGN THAT INCORPORATES CLOSURE OF NORTHWOOD
 ROAD AND THE SOUTHWEST CORNER OF THE SITE AS PUBLIC
 OPEN SPACE SEEMS TO MEET THE 10,000 SQUARE FOOT
 REQUIREMENT. STAFF DID SOME ROUGH CALCULATIONS AND IT
 SEEMS TO BE CLOSE. PROVIDE CALCULATIONS OF THIS AREA
 (PLAZA III AND IV) THAT MEET THE DEFINITION OF OPEN
 SPACE - OPEN TO THE SKY AND NOT WITHIN THE RIGHT-OF-WAY
 OR REQUIRED MINIMUM SETBACK. THE AMOUNT OF AREA FOR
 PLAZA III WILL BE REDUCED ON THE NORTH, EAST AND SOUTH
 AS WELL AS WHERE THE OVERHEAD PASSAGE IS. PLAZA IV WILL
 BE REDUCED ON THE NORTH SIDE DUE TO THE OVERHANG PLUS
 THE REQUIRED 10-FOOT SETBACK. IF THIS AREA IS LESS THAN
 10,000 SQUARE FEET STAFF CAN REVIEW THE MERITS OF THE
 PASEO TEXT CHANGE VS. A VARIANCE TO THE AMOUNT OF
 REQUIRED PUBLIC OPEN SPACE VS. OPEN SPACE CODE CHANGE
 SIMILAR TO THE DMP TO PERMIT CERTAIN COVERED AREAS TO
 APPLY AS OPEN SPACE. IT MAY STILL BE NECESSARY TO ADD
 PUBLIC PASEO AS A FEATURE, BUT STAFF PREFERS THAT THIS
 NOT SUBSTITUTE FOR TRUE OPEN SPACE.
  
 PRIVATE OPEN SPACE
  
 50) UPDATED COMMENT: THANK YOU FOR PROVIDING A TABLE
 AND PLAN THAT DESCRIBE THE PRIVATE OPEN SPACE
 REQUIREMENTS.
  
 A. THE TABLE DOES NOT CONTAIN THE SAME SITE AREA THAT
 IS LISTED ON THE DATA COVER SHEET. NOTE: THIS WILL
 CHANGE WHEN COMMENT NUMBER 15 IS ADDRESSED.
 B. PRIVATE OPEN SPACE IS BASED ON THE SITE AREA WHERE
 THE BUILDING(S) IS LOCATED. BUILDINGS A, B AND D ARE
 ALL LOCATED ON ONE SITE, SO 10% OF THIS SITE AREA SHALL
 BE PROVIDED AS PRIVATE OPEN SPACE. THIS MAY ALL BE
 CONTAINED ON THE BUILDING A AMENITY DECK. PLEASE NOTE
 THAT THE PRIVATE OPEN SPACE TABLE LISTS PRIVATE OPEN
 SPACE ON LEVEL 2 OF BUILDING B, WHICH HAS NOT OPEN
 SPACE AT THIS LOCATION.
 C. PROVIDE INFORMATION ON HOW THE BUILDING C PRIVATE
 OPEN SPACE MEETS THE REQUIREMENTS OF SECTION
 94-210.K.3.C. PRIVATE OPEN SPACES SHALL PROVIDE SHADED
 AREAS, AND THEIR GROUND SURFACE SHALL BE A COMBINATION
 OF PAVING MATERIALS, LAWN, OR GROUND COVER. NOTE:
 ROOFTOP STRUCTURES MUST CLEARLY SHOW THAT THEY ARE NOT
 EXCEEDING THE HEIGHT ALLOWANCE.
  

Review Stop Z ZONING
Rev No 2 Status F Date 04-14-2022 Cont ID  
Sent By eschneid Date 04-14-2022 Time 11:05 Rev Time 12.00
Received By eschneid Date 04-14-2022 Time 11:05 Sent To  
Notes
2022-04-14 11:06:18CASE NO. 1895 - FEBRUARY 2022 RESUBMITTAL
 NORTHWOOD COMMONS - NMUD ANCHOR SITE
 BROADWAY & 24TH STREET
  
 - CONTACT ERIC SCHNEIDER @ (561) 822-1446,
 [email protected]
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF FOUR
 (4) PAPER COPIES AND AN ELECTRONIC COPY IN .PNG FORMAT
 OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS
 TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL
 COMMENTS.
  
 - THE PPRC COMMENTS SHALL BE SUFFICIENTLY ADDRESSED AND
 SUBMITTED TO THE PLANNING DIVISION BY 5 PM ON FRIDAY,
 APRIL 29, 2022, TO BE ELIGIBLE TO BE SCHEDULED FOR THE
 JUNE 21, 2022 PLANNING BOARD MEETING.
  
 - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT
 RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS
 FROM THE DATE OF THE PPRC MEETING (BY JUNE 14, 2022),
 THE PLANNING DIVISION MAY NOTIFY THE APPLICANT THAT THE
 CASE IS CONSIDERED WITHDRAWN. ANY FURTHER ACTION SHALL
 REQUIRE A NEW DEVELOPMENT APPLICATION.
  
 - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($600).
  
 - PUBLIC HEARING NOTIFICATION SIGNAGE SHALL BE POSTED
 IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION
 94-39(I)(5) OF THE ZONING AND LAND DEVELOPMENT
 REGULATIONS.
  
 THE DSI RESUBMITTAL COINCIDES WITH A CODE TEXT CHANGE
 TO THE NMUD DEVELOPMENT REGULATIONS. STAFF HAS REVIEWED
 THE SUBMITTED PLANS FOR COMPLIANCE WITH BOTH THE
 EXISTING REGULATIONS AND THE PROPOSED TEXT CHANGES,
 WHERE APPLICABLE. THE APPLICANT?S STATED GOAL WAS TO
 AMEND THE DEVELOPMENT REGULATIONS TO REFLECT THE DESIGN
 OF THE PLAN WHERE IT COULD NOT COMPLY WITH THE
 REGULATIONS AND THUS AVOID VARIANCES/WAIVERS AT THE
 ZONING BOARD OF APPEALS. THE SUBMITTED CODE REVISIONS
 DO NOT COVER ALL OF THE AREAS WHERE THE PLAN DOES NOT
 COMPLY WITH THE CODE. STAFF HAS IDENTIFIED THESE
 DISCREPANCIES. FOR BOTH THE APPLICANT PROPOSED AND THE
 STAFF IDENTIFIED DISCREPANCIES, STAFF HAS INCLUDED IF
 STAFF WILL SUPPORT A CODE CHANGE OR NOT. NOTE: THE CODE
 REVISION CASE INCLUDES COMMENTS RELATED TO THE PROPOSED
 CODE CHANGES THAT DO NOT DIRECTLY IMPACT THE SITE PLAN.
  
 1) REPEAT COMMENT: PROVIDE A TRAFFIC PERFORMANCE
 STANDARDS APPROVAL LETTER FROM THE PALM BEACH COUNTY
 TRAFFIC DIVISION FOR THE FULL SCOPE OF THE PROPOSED
 DEVELOPMENT. *** THIS IS REQUIRED PRIOR TO SCHEDULING A
 PLANNING BOARD HEARING.
  
 2) UPDATED COMMENT: THE NON-RESIDENTIAL SQUARE FOOTAGE
 LISTED IN THE TRAFFIC IMPACT ANALYSIS DOES NOT MATCH
 THE SITE DATA ON THE PLANS. THE TRAFFIC IMPACT ANALYSIS
 MUST REFLECT THE FULL SCOPE OF THE DEVELOPMENT.
  
 3) REPEAT COMMENT: PROVIDE A PREDETERMINATION LETTER
 FROM FDOT FOR THE IMPROVEMENTS WITHIN THE FDOT
 RIGHTS-OF-WAY OF BROADWAY AND 24TH AND 25TH STREETS
 ADJACENT TO THE PROJECT. *** THIS IS REQUIRED PRIOR TO
 SCHEDULING A PLANNING BOARD HEARING.
  
 4) REPEAT COMMENT: SECTION 94-209.J.1.C REQUIRES THAT
 PROJECTS WITH THREE OR MORE DISTINCTLY SEPARATE
 BUILDINGS HAVE SUBSTANTIALLY DIFFERENT FRONT
 ELEVATIONS. SUBSTANTIALLY DIFFERENT FRONT ELEVATIONS
 SHALL INCLUDE BUT NOT BE LIMITED TO VARIATIONS IN
 FENESTRATION, MATERIAL, MASSING AND COLOR. BUILDINGS B
 AND C DO NOT HAVE SUBSTANTIALLY DIFFERENT FRONT
 ELEVATIONS FROM EACH OTHER IN ACCORDANCE WITH THE CODE
 REQUIREMENTS.
  
 5) THE MAXIMUM GROUND FLOOR STORY HEIGHT IN NMUD IS 20
 FEET. THE RETAIL AREAS ON THE NORTHEAST PORTION OF
 BUILDING A ARE SHOWN AT 26 FEET, WHICH DOES NOT COMPLY.
 THE STORY HEIGHT LIMITATION WILL NEED TO BE REMOVED AS
 AN NMUD CORE SUBAREA REQUIREMENT. STAFF DOES NOT OBJECT
 TO THIS ADDED CHANGE.
  
 6) THE MAXIMUM STORY HEIGHT ABOVE THE GROUND FLOOR IN
 NMUD IS 12 FEET. PLEASE EXPLAIN THE 13-FOOT 4-INCH
 LEVEL SHOWN ON THE ELEVATIONS (LEVEL 3.5) FOR BUILDING
 A. IF IT IS IN EXCESS OF 12 FEET, IT DOES NOT COMPLY.
 THE STORY HEIGHT LIMITATION WILL NEED TO BE REMOVED AS
 AN NMUD CORE SUBAREA REQUIREMENT. STAFF DOES NOT OBJECT
 TO THIS ADDED CHANGE.
  
 7) BUILDING A: THE BUILDING HEIGHT PERMITTED WITHIN THE
 AREA SOUTH OF CORE PARCEL B IS 56 FEET. THE UNITS ON
 THE SOUTH END OF THE BUILDING, EAST OF PINEWOOD,
 STARTING AT RESIDENCE LEVEL 4 EXCEED THE PERMITTED.
 STAFF HAS NOTED THAT THE APPLICANT HAS SUBMITTED A CODE
 CHANGE TO MOVE THIS LINE; HOWEVER, STAFF DOES NOT
 SUPPORT THIS PROPOSED CHANGE. A SOLUTION IS TO MOVE
 THIS LEG OF THE TOWER NORTH, PREFERABLY TO ALIGN WITH
 24TH STREET TO PROVIDE A TERMINAL VISTA. THE SOUTH
 BOUNDARY OF CORE PARCEL B WAS SPECIFICALLY SET AT THIS
 LOCATION TO PROVIDE A TRANSITION TO THE NORTHWOOD ROAD
 HISTORIC DISTRICT. NOTE: SINCE PINEWOOD IS BEING
 ABANDONED, THE AREA OF THE ABANDONED ROADWAY NEEDS TO
 BE ASSIGNED A BUILDING HEIGHT DESIGNATION. STAFF DOES
 NOT OBJECT TO THE PARCEL A HEIGHT LINE MOVING EAST TO
 COVER THE ABANDONED PORTION OF PINEWOOD.
  
 8) BUILDING B: THE PORTION OF THE BUILDING WITHIN THE
 NORTHWOOD ROAD HISTORIC DISTRICT CONTINUES TO BE SHOWN
 IN PLAN AND ELEVATION (SHEET A404) EXCEEDING THE
 PERMITTED NUMBER OF STORIES AND BUILDING HEIGHT (3
 STORIES/44 FEET). NOTE: THE BUILDING IS CORRECTLY SHOWN
 ON SHEET A113. ALL DRAWINGS MUST SHOW CONSISTENT, CODE
 COMPLIANT CONDITIONS.
  
 9) BUILDING C: THERE IS A DISCREPANCY WITH BUILDING C
 IN PLAN AND IN ELEVATION. THE PLAN VIEW SHOWS THAT THE
 4TH STORY IS LOCATED ON THE NORTH SIDE OF THE ALLEY AND
 THUS OUTSIDE OF THE NORTHWOOD ROAD HISTORIC DISTRICT
 BOUNDARY. HOWEVER, THE ELEVATION VIEW ON SHEET A405
 SHOWS THE 4TH STORY EXTENDING INTO THE NORTHWOOD ROAD
 HISTORIC DISTRICT, WHERE ONLY A 3-STORY BUILDING IS
 PERMITTED. ALL DRAWINGS MUST SHOW CONSISTENT, CODE
 COMPLIANT CONDITIONS.
  
 10) PROVIDE THE SQUARE FOOTAGE FOR THE UNITS IN
 BUILDING B SO THAT STAFF CAN VERIFY THAT THE MINIMUM
 UNIT SIZE IS ACHIEVED.
  
 11) BUILDING B SHOWS FOUR 1,200 SF TOWNHOUSES. THIS
 UNIT'S SIZE/TYPE IS NOT LISTED ON THE UNIT MATRIX
 BREAKDOWN.
  
 12) BUILDING B IS NOT SHOWN IN THE SAME LOCATION IN
 RELATIONSHIP TO THE WEST PROPERTY LINE ON SHEETS A113
 (ZERO FEET), A404 (5 FEET) AND A301 (10 FEET). ALL
 DRAWINGS MUST SHOW CONSISTENT, CODE COMPLIANT
 CONDITIONS.
  
 13) THE WEST PROPERTY LINES DO NOT OVERLY THE SAME ON
 SHEET A301. THIS LEADS TO INCORRECT SETBACK DIMENSIONS.
 ADDITIONALLY, THE DIMENSION MUST BE FROM THE FURTHEST
 PROJECTION. THE SUPPORT COLUMNS ARE SHOWN ENCROACHING
 INTO THE REQUIRED 5-FOOT LANDSCAPE BUFFER.
  
 14) PROVIDE THE ROOF PLAN FOR THE TOWER PORTION OF
 BUILDING A.
  
 15) PROVIDE THE HEIGHTS OF THE ROOFTOP MECHANICAL
 EQUIPMENT AND THE MECHANICAL EQUIPMENT SCREENING
 HEIGHTS FOR ALL THREE BUILDINGS SO THAT STAFF CAN
 VERIFY THAT THE EQUIPMENT IS SCREENED IN ACCORDANCE
 WITH THE NMUD REQUIREMENTS.
  
 16) PROVIDE THE VISIBILITY TRIANGLE INFORMATION SO
 STAFF CAN VERIFY COMPLIANCE WITH CODE FOR ALL CORNERS,
 INCLUDING THE BROADWAY EXTENSION, THE ALLEY BETWEEN
 BUILDING C, THE GARAGE RAMP AT 25TH STREET, AND THE NW
 CORNER OF PINEWOOD AND NORTHWOOD ROAD.
  
 17) THE MAXIMUM LOT WIDTH FOR FLEX BUILDINGS IS 200
 FEET. THE LOT CONTAINING BUILDING B IS 231 FEET LONG.
  
 18) THE TOWER IS SHOWN ENCROACHING THE BROADWAY TOWER
 SETBACK FROM THE PODIUM. THE 15-FOOT SETBACK LINE
 DIMENSION TAG DOES NOT MATCH BLUE SETBACK LINE NOR DOES
 IT SCALE TO 15 FEET. THE LINE SCALES TO 15 FEET.
  
 19) SHEET A0.02 LISTS THE GROSS LAND AREA AS 144,250
 SQUARE FEET. SHEET L1.01 LISTS THE SITE AS HAVING
 88,595 SQUARE FEET, WHICH IS NOT THE AREA COVERED BY
 BUILDING A. ALL PLANS MUST INCLUDE THE CORRECT AMOUNT
 OF AREA. EACH DEVELOPMENT PARCEL, BUILDING A, B AND C,
 MUST BE BROKEN DOWN SEPARATELY (INCLUDING THE ABANDONED
 RIGHTS-OF-WAY) AND SHOW COMPLIANCE WITH THE PERVIOUS
 AND IMPERVIOUS REQUIREMENTS. NOTE: THE LISTED 12,630
 SQUARE FEET OF PERVIOUS AREA WOULD NOT MEET THE MINIMUM
 PERVIOUS AREA REQUIRED BY THE NMUD REGULATIONS, EITHER
 INDIVIDUALLY OR COLLECTIVELY.
  
 20) THE SETBACKS AND BUILDING FRONTAGE ALONG 23RD
 STREET AND THE REMAINING SECTION OF PINEWOOD FOR
 BUILDING A ARE NOT MET.
  
 21) THE NMUD REGULATIONS REQUIRE THAT THE PRIMARY
 ENTRANCE TO THE UPPER LEVELS OF A MIXED-USE BUILDING
 SHALL BE FROM A PUBLIC RIGHT-OF-WAY. WHERE IS THE
 PRIMARY ENTRANCE TO THE UPPER LEVELS OF BUILDING A? IT
 APPEARS THAT IT IS EITHER THE NORTH OR SOUTH LOBBY,
 NEITHER OF WHICH ACCESS A PUBLIC RIGHT-OF-WAY. PUTTING
 THESE LOBBY ENTRANCES ADJACENT TO THE LOADING DOCKS AND
 INTERNAL TO THE BUILDING DOES NOT PROVIDE AN
 ATTRACTIVE, ACTIVE STREET PRESENCE FOR THE RESIDENTIAL
 TOWER. THE MAIN ENTRANCE SHOULD BE PROMINENTLY ON
 BROADWAY OR NORTHWOOD ROAD.
  
 22) THE NMUD REGULATIONS REQUIRE THAT THE PRIMARY
 ENTRANCE TO THE UPPER LEVELS OF A MIXED-USE BUILDING
 SHALL BE FROM A PUBLIC RIGHT-OF-WAY. THE PRIMARY
 ENTRANCE TO THE UPPER LEVELS OF BUILDING B IS SHOWN
 FROM THE PRIVATE RIGHT-OF-WAY EXTENSION OF BROADWAY.
  
 23) BUILDING C IS A FLEX BUILDING. TABLE VII-7 REQUIRES
 THAT FLEX BUILDING THAT ABUTS A 15-FOOT WIDE ALLEY HAVE
 A 15-FOOT SETBACK FROM THE EDGE OF THE ALLEY. BUILDING
 C DOES NOT MEET THIS REQUIREMENT. STAFF IS NOT PREPARED
 TO SUPPORT CHANGES TO THE SETBACK REQUIREMENTS OUTSIDE
 OF THE CORE SUB-DISTRICT SINCE THIS WILL AFFECT
 PROPERTIES THROUGHOUT NMUD.
  
 24) THE NMUD REGULATIONS CURRENTLY LIMIT THE TOWER
 FLOOR PLATE TO 30,000 SQUARE FEET FOR ANY SINGLE
 FLOORPLATE WITH AND AVERAGE FLOORPLATE OF UP TO 20,000
 SQUARE FEET. THE TEXT AMENDMENT IS REQUESTING THAT THE
 MAXIMUM FLOORPLATE CAN BE UP TO 50,000 SQUARE FEET.
 PLEASE PROVIDE VERIFICATION THAT THE AVERAGE TOWER
 FLOORPLATE IS 20,000 SQUARE FEET OR LESS.
  
 DESIGN STANDARDS
  
 25) REPEAT COMMENT: NO INFORMATION WAS PROVIDED TO
 VERIFY THE ACTIVE USE STANDARDS, THE FACADE
 ARTICULATION REQUIREMENTS, THE ARCHITECTURAL TREATMENT
 STANDARDS OR THE FENESTRATION STANDARDS THAT ARE
 REQUIRED BY THE NMUD REGULATIONS. THIS SHALL BE
 PROVIDED IN TABULAR FORM AND SHOWN ON THE ELEVATION
 DRAWINGS.
  
 26) STAFF WILL NOT SUPPORT THE AMENDMENT THAT WILL
 PERMIT THE BUILDING THAT IS ALMOST 400 FEET IN LENGTH
 ALONG BROADWAY AND 350 FEET IN LENGTH ALONG 25TH STREET
 WITHOUT THE INCLUSION OF PLANAR BREAKS.
  
 27) PROVIDE THE DIMENSIONS OF THE PROJECTIONS AND
 ENCROACHMENTS (EX. BALCONIES AND OTHER ARCHITECTURAL
 FEATURES) ON THE PLANS AND ELEVATIONS SO THAT STAFF CAN
 VERIFY COMPLIANCE WITH THE NMUD REGULATIONS.
  
 28) THE ROOF OF THE PASEO IS NOT RENDERED CORRECTLY.
 THE SITE AND LANDSCAPE PLANS DO NOT SHOW HOLES IN THE
 PARKING DECK THAT ARE ACCENTUATED WITH LANDSCAPE.
 ADDITIONALLY, THE GRADE LEVEL LANDSCAPE THAT HAS BEEN
 ADDED DOES NOT MATCH THE LANDSCAPE PLAN. YOU MAY NOT
 PROVIDE INACCURATE RENDERINGS THAT MAKE THE FINAL
 PRODUCT LOOK DIFFERENT THAN WHAT YOU ARE SHOWING IN THE
 PLANS.
  
 STREETSCAPE
  
 29) REPEAT COMMENT: NO DETAILS WERE PROVIDED ON THE
 SITE LIGHTING TO VERIFY COMPLIANCE WITH THE NMUD
 REGULATIONS. *** THIS IS REQUIRED PRIOR TO SCHEDULING A
 PLANNING BOARD HEARING SO THAT STAFF CAN VERIFY THAT
 THERE IS NO INCONSISTENCY WITH THE CODE REQUIREMENTS.
 THE MIXED-USE DEVELOPMENT REGULATIONS REQUIRE THAT
 STREETLIGHTS BE PROVIDED ALONG PUBLIC RIGHTS-OF-WAY
 ADJACENT TO THE SITE. CLEARLY SHOW THE PEDESTRIAN
 ORIENTED LIGHTING FOR THE SIDEWALKS ALONG THE SITE ON
 THE PLANS. THE LANDSCAPE AND CIVIL PLANS INDICATE THAT
 SOME EXISTING LIGHTS WILL REMAIN, BUT NOT ALL OF THE
 SITE IS COVERED. ADDITIONALLY, IT DOES NOT APPEAR THAT
 ALL OF THE EXISTING STREETLIGHT ORIENTATIONS ARE
 ACCURATELY DEPICTED. STAFF MUST BE ABLE TO VERIFY THAT
 THE LIGHTS DO NOT INTERFERE WITH PROPOSED TREE
 CANOPIES.
  
 30) PROVIDE VERIFICATION THAT WHERE THE SIDEWALKS OR
 WALKWAYS CROSS THE DRIVEWAY ENTRANCES TO THE PARKING
 FACILITIES, LOADING AREAS, OR STREETS (BOTH PRIVATE AND
 PUBLIC), THE SIDEWALK OR WALKWAY IS CONTINUOUS AND
 REMAINS AT A CONSTANT LEVEL.
  
 31) VERIZON HAS APPROVAL TO INSTALL A WIRELESS
 COMMUNICATION FACILITY POLE WITHIN THE BROADWAY
 RIGHT-OF-WAY ADJACENT TO THE SITE. SHOW THE POLE ON THE
 PLANS SO THAT STAFF CAN VERIFY THAT YOUR PLANS ARE
 DESIGNED TO NOT HAVE CONFLICTS (EX. PROPOSED PARKING
 SPACES, TREES, ETC.).
  
 32) THE ARCHITECTURAL PLANS MUST SHOW THE MEDIANS IN
 BROADWAY THAT ARE SHOWN ON THE CIVIL AND LANDSCAPE
 PLANS. THE LANE WIDTH DIMENSIONS NEED TO BE PROVIDED AT
 THESE LOCATIONS.
  
 33) PLEASE EXPLAIN WHY THE PROPOSED ROADWAY CROSS
 SECTIONS DO NOT COMPLY WITH THE FIGURES VII-16 AND
 VII-18 STREET SECTIONS. THE STREET SECTIONS, COMBINED
 WITH THE BUILDING SETBACKS ARE DESIGNED TO PROVIDE FOR
 WIDE, PEDESTRIAN FRIENDLY SIDEWALKS. THIS DOES NOT
 OCCUR ALONG PINEWOOD AND 25TH STREET. NO CROSS SECTION
 WAS PROVIDED FOR NORTHWOOD ROAD, 23RD STREET, THE
 BROADWAY EXTENSION AND THE PORTION OF PINEWOOD THAT IS
 REMAINING. ADDITIONALLY, PINEWOOD EXCEEDS THE NMUD
 MAXIMUM LANE WIDTH OF 10 FEET, WHICH UNLESS THE WIDER
 WIDTH IS REQUIRED BY THE TRAFFIC ENGINEER, REQUIRES A
 WAIVER.
  
 34) BENCHES NEED TO BE DESIGNED TO PREVENT SLEEPING.
  
 35) THERE ARE MULTIPLE LOCATIONS WHERE SHEET 301 SHOWS
 THE LANDSCAPE PATTERN OVERLAID ON PAVEMENT. THE SITE
 PLAN NEEDS TO ACCURATELY DEPICT WHAT IS SHOWN ON THE
 LANDSCAPE PLAN.
  
 36) THE DESIGN OF THE PASEO NEEDS TO BE REEXAMINED:
  
 A. THE 4.33-FOOT DIMENSION BETWEEN THE PLANTERS AND THE
 STOREFRONTS IS NOT ADEQUATE FOR PEDESTRIANS TO
 COMFORTABLY WINDOW SHOP.
 B. THE PROPOSED TEXT HAD CONTEMPLATED RESTAURANT
 OUTDOOR SEATING IN THE PASEO, YET BASED ON THE PLANTER
 LOCATIONS, THERE IS NO ROOM FOR ANY OUTDOOR SEATING.
 C. THE MICRO MOBILITY STATION IS LOCATED DIRECTLY IN
 FRONT OF A DOORWAY. WHILE STAFF AGREES THAT A MICRO
 MOBILITY STATION NEEDS TO BE LOCATED IN CLOSE PROXIMITY
 TO THE PASEO, THE SPECIFIC LOCATION IS NOT AN
 APPROPRIATE LOCATION. PROVIDE THE MICRO MOBILITY
 STATION DIMENSIONS ON THE PLANS.
  
 PARKING/LOADING
  
 38) NMUD ONLY PERMITS SURFACE PARKING LOTS TO THE SIDE
 OR THE REAR OF A PROPERTY. THE PROPOSED PARKING LOT
 FRONTING ON 23RD STREET DOES NOT MEET THIS STANDARD.
 PLANNING STAFF DOES NOT SUPPORT A CODE AMENDMENT TO
 PERMIT PARKING LOTS WITHIN THE BUILDING?S FRONT SETBACK
 AREA.
  
 39) THE SURFACE LOT, WHICH WHILE NOT PERMITTED BY THE
 REGULATIONS, ALSO FAILS TO PROVIDE THE REQUIRED DIRECT
 PEDESTRIAN ACCESS TO A PUBLIC WALKWAY, NOR DOES IT
 PROVIDE THE REQUIRED LANDSCAPE BUFFER.
  
 40) THE ENTRANCE TO THE SURFACE AND GARAGE PARKING AREA
 FROM PINEWOOD EXCEEDS THE MAXIMUM PERMITTED 24 FEET IN
 WIDTH DUE TO THE RADIUS STARTING INSIDE THE PROPERTY
 LINE. THE RADIUS/FLAIR MAY NOT WIDEN UNTIL IT IS WITHIN
 THE RIGHT-OF-WAY.
  
 41) PROVIDE THE DIMENSIONS FOR THE LOADING ZONES ON THE
 PLANS SO THAT STAFF CAN VERIFY CODE COMPLIANCE. 70K SF
 OF COMMERCIAL USE REQUIRES TWO 10 X 50 FOOT SPACES. THE
 SPACES PROVIDED ON THE PLANS DO NOT APPEAR TO BE 50
 FEET IN LENGTH.
  
 42) ALL LEVELS OF THE PARKING GARAGE MUST BE SCREENED
 BY A LINER BUILDING CONTAINING A MINIMUM DEPTH OF 20
 FEET IF HABITABLE SPACE. THIS IS NOT MET ALONG THE FULL
 LENGTH OF 25TH STREET, NORTHWOOD ROAD AND 23RD STREET
 AND PARTIALLY ALONG BROADWAY. THE PROPOSED CODE CHANGE
 DID NOT ADDRESS THE FAILURE TO PROVIDE SCREENING. STAFF
 WILL NOT SUPPORT BROADWAY NOT HAVING THE 20-FOOT DEPTH
 OF HABITABLE SPACE. IF THE CODE IS AMENDED ON THE OTHER
 FRONTAGES, THEN THERE NEEDS TO BE SPECIFIC LANGUAGE
 DEALING WITH ARCHITECTURAL TREATMENT AND THE PROVISION
 OF PLANAR BREAKS TO VARY THE FA?ADE IN ORDER TO CONCEAL
 THE NON-HABITABLE PARKING.
  
 43) REPEAT COMMENT: DEAD END PARKING ROWS FOR
 UNASSIGNED PARKING ARE NOT PERMITTED WITHOUT A
 TURNAROUND SPACE. THE PUBLIC PARKING SPACES ON THE
 LOWER PARKING LEVEL MAY NOT BE LOCATED ON A DEAD-END
 AISLE WITHOUT A TURNAROUND SPACE. FIVE PARKING SPACES
 ON THE NORTHERN PORTION OF THE GARAGE WILL NEED TO BE
 CONVERTED INTO TURN AROUND SPACES.
  
 44) UPDATED COMMENT: ALL PARKING GARAGES MUST HAVE
 DIRECT PEDESTRIAN ACCESS TO A PUBLIC WALKWAY. PROVIDE
 WHICH ELEVATORS ARE FOR USE BY THE PUBLIC TO ACCESS THE
 GROUND FLOOR. ADDITIONALLY, SINCE ALL OF THE ELEVATOR
 ACCESS IS THROUGH SOME SORT OF LOBBY ON THE GROUND
 FLOOR, PROVIDE INFORMATION ON HOW THE PUBLIC WILL BE
 ABLE TO ACCESS THE LOBBY. THE SOUTH LOBBY, WHICH
 PROVIDES ACCESS TO THE SOUTHERN, LOWER PARKING LEVEL
 SEEMS TO BE A RESIDENT LOBBY.
  
 45) COLUMNS ARE SHOWN IN DRIVE AISLES ON NORTH PORTION
 OF THE LOWER LEVEL GARAGE.
  
 46) MOST OF THE ADA ACCESS AISLES ON THE BOTH PARKING
 LEVELS APPEAR TO HAVE A PORTION OF THE COLUMN
 ENCROACHING. IF THIS IS NOT THE CASE, YOU NEED TO CLEAN
 UP THE DRAWINGS TO SHOW NO ENCROACHMENTS.
  
 47) ADA SPACE NEXT TO STAIRS ON THE EASTERN WALL OF
 UPPER PARKING LEVEL HAS A COLUMN BLOCKING THE 5-FOOT
 WIDE ACCESS AISLE AND NEEDS TO HAVE AN EXTRA FOOT ALONG
 THE STAIRWELL WALL TO PERMIT ADEQUATE DOOR OPENING.
  
 48) ALL PARKING SPACES NEXT TO A WALL NEED TO PROVIDE
 AN EXTRA FOOT TO PERMIT ADEQUATE DOOR OPENING.
  
 49) THE PARKING SPACES THAT HEAD AGAINST WALLS NEED
 MORE CLARITY THAT THEY MEET THE REQUIRED 18-FOOT DEPTH.
 THE SPACES WITH DIMENSION TAGS SHOW THE END OF THE
 SPACE IN THE MIDDLE OF THE LINE SHOWING THE WALL, WHICH
 MAKES THEM TOO SHORT. IF THIS IS A LINE WEIGHT ISSUE ON
 THE PLAN VERSION, PROVIDE A CROSS SECTION THAT CLEARLY
 DEMONSTRATES THAT THE PARKING STALLS AND DRIVE AISLES
 HAVE SUFFICIENT DEPTH. THERE ARE SOME SPACES THAT THE
 PARKING SPACE BOX IS SHOWN IN THE WALL (EX OVERLOOKING
 THE RAMP ON THE LOWER PARKING LEVEL.
  
 50) 20 SPACES ALONG THE NORTH WALL AND 10 SPACES ALONG
 THE SOUTH WALL OF THE UPPER PARKING LEVEL AND 15 SPACES
 ALONG THE NORTH WALL AND 8 SPACES ALONG THE SOUTH WALL
 ON THE LOWER PARKING LEVEL DO NOT MEET THE MINIMUM
 18-FOOT STALL DEPTH. THIS IS 53 NON-COMPLIANT PARKING
 SPACES.
  
 51) THE PARKING RAMPS MAY NOT BE SHOWN ENCROACHING THE
 COLUMNS AND WALLS ALONG THE WEST SIDE OF THE BUILDING.
  
 52) THE STAIRWELLS ON THE EAST SIDE OF THE BUILDING
 ENCROACH INTO THE DRIVE AISLES RESULTING IN THE CODE
 REQUIRED 24-FOOT WIDTH NOT IN COMPLIANCE.
  
 53) PROVIDE THE DETAILS ON HOW PEOPLE ARE PROTECTED
 FROM THE EDGES OF THE PARKING RAMPS. THIS MAY AFFECT
 THE PARKING STALLS ADJACENT TO THE RAMPS.
  
 54) THE PARKING STALL DETAIL PROVIDED ON THE CIVIL PLAN
 DOES NOT MEET CITY STANDARDS. PROVIDE THE ACCURATE
 DETAIL.
  
 55) THE RESPONSE STATES THAT THE TANDEM SPACES ARE FOR
 RESIDENTS, WHICH DOES NOT PERMIT THE INSIDE SPACE TO BE
 COUNTED TOWARD MEETING THE MINIMUM PARKING REQUIREMENTS
 SINCE THE NMUD REQUIRES ONE PARKING SPACE PER UNIT. THE
 INSIDE SPACE CANNOT BE ASSIGNED TO A UNIT THAT IS
 DIFFERENT FROM THE OUTSIDE SPACE, SO IT MAY NOT COUNT.
  
 56) THE PARKING PROVIDED TABLES SHALL CLEARLY SEPARATE
 THE PROVIDE ADA SPACES FROM THE TOTAL PROVIDED SPACES
 FOR EACH CATEGORY. THE CURRENT LINE ITEMS MAKE IT LOOK
 LIKE THERE ARE ADA SPACES IN ADDITION TO THE REGULAR
 SPACES.
  
 57) 77,820 SQUARE FEET OF COMMERCIAL REQUIRES 156
 PARKING SPACES, NOT 152 OR 153 AS SHOWN ON DIFFERING
 PARKING TABLES. THE TOTAL REQUIRED PARKING IS 534
 SPACES.
  
 58) 53 PUBLIC PARKING SPACES ARE REQUIRED IN ACCORDANCE
 WITH THE AGREEMENT WITH CRA AND NEED TO BE REFLECTED ON
 THE PARKING TABLE AND THE PLANS.
  
 59) EVEN WHEN NOT REMOVING THE PARKING SPACES THAT DO
 NOT COMPLY WITH CODE DEPTH, WALL ADJACENCY OR DEAD-END
 ROWS, THE PROJECT DOES NOT PROVIDE CODE MINIMUM
 PARKING. THERE ARE 592 SPACES LISTED AS PROVIDED.
 REMOVING THE 18 TANDEM AND 53 REQUIRED PUBLIC CRA
 SPACES, RESULTS IN ONLY 521 PARKING SPACES PROVIDED,
 WHICH IS LESS THAN THE REQUIRED 534 SPACES.
  
 60) THE CRA AGREEMENT REQUIRES THAT THE DEVELOPER
 CONSTRUCT PUBLIC PARKING SPACES IN AN AMOUNT TO EQUAL
 10% OF THE PARKING REQUIRED FOR THE PROJECT (53 PARKING
 SPACES). WHILE THE PLANS DO NOT CLEARLY DEMONSTRATE
 WHERE THE 53 CRA REQUIRED PARKING SPACES ARE LOCATED,
 IT APPEARS THAT SOME OF THEM ARE INTENDED TO BE LOCATED
 WITHIN THE ON-STREET PARKING SHOWN ON THE PLANS. SINCE
 THE LANGUAGE REQUIRES THAT NEW PARKING SPACES BE
 CONSTRUCTED TO MEET THE CRA REQUIREMENT, PROVIDE AN
 EXISTING PARKING INVENTORY OF THE ON-STREET PARKING
 SPACES. EXISTING PARKING SPACES MAY NOT BE COUNTED AS
 NEWLY CONSTRUCTED SPACES, AND ANY SPACES BEING REMOVED,
 WILL NEED TO BE REPLACED AND MAY NOT BE COUNTED AS
 NEWLY CREATED PARKING SPACES.
  
 61) THE PROJECT REQUIRES 16 BICYCLE SPACES FOR THE
 COMMERCIAL PORTION AND 38 BICYCLE SPACES FOR THE
 RESIDENTIAL PORTION. THERE ARE 54 TOTAL REQUIRED
 BICYCLE PARKING SPACES. THIS SHALL BE CORRECTLY
 REFLECTED ON THE PARKING TABLE.
  
 62) WHO HAS ACCESS TO THE BICYCLE STORAGE AREA ON THE
 UPPER PARKING LEVEL OF BUILDING A?
  
 63) PROVIDE THE DIMENSIONS AND DETAIL FOR THE RACKS,
 INCLUDING THE NUMBER OF SPACES, LOCATED IN THE BICYCLE
 STORAGE ROOM AS WELL AS THE DIMENSIONS OF THE ROOM AND
 THE RACKS IN THE ROOM. THIS SHALL BE PROVIDED ON ITS
 OWN BICYCLE ROOM DETAIL SHEET THAT THIS AT A LEGIBLE
 SCALE.
  
 64) WHERE IS THE REQUIRED SHOWER AND CHANGING FACILITY
 FOR THE COMMERCIAL TENANTS OF BUILDING A?
  
 65) ALL ON-STREET BICYCLE PAD DIMENSIONS MUST BE
 CLEARLY SHOWN ON THE PLANS SO THAT STAFF CAN VERIFY
 THAT THERE IS SUFFICIENT ROOM AND THAT SIDEWALKS ARE
 NOT BLOCKED. NUMEROUS BICYCLES RACKS ARE CURRENTLY
 SHOWN BLOCKING SIDEWALKS. THE BICYCLE RACK DETAILS FOR
 THESE SPACES NEED TO BE PROVIDED.
  
 66) THE MICRO MOBILITY STATION NORTH OF BUILDING B MUST
 BE RELOCATED. IT INTERFERES WITH A PROPOSED BICYCLE
 RACK.
  
 LANDSCAPE
  
 67) UPDATED COMMENT: THANK YOU FOR PROVIDING THE
 REQUIRED LANDSCAPE BUFFER STRIP ALONG THE RAILROAD
 RIGHT-OF-WAY. THE SITE PLAN SEEMS TO SHOW COLUMNS
 ENCROACHING INTO THE LANDSCAPE BUFFER, WHICH IS NOT
 PERMITTED. PLEASE REVIEW THE DRAWINGS FOR CLARITY SINCE
 THE CIVIL AND LANDSCAPE PLANS DO NOT SHOW AN
 ENCROACHMENT.
  
 68) PROVIDE THE DIMENSIONS ON THE PLANS TO VERIFY THAT
 A LANDSCAPE STRIP, A MINIMUM OF FIVE FEET IN WIDTH, IS
 PROVIDED ALONG THE CURBSIDE ALONG THE STREET EDGE. IF
 TREE GRATES ARE USED INSTEAD OF A LANDSCAPE STRIP, THEN
 THE REQUIRED DIMENSION SHALL BE PROVIDED ON THE SITE
 PLAN. NOTE: THE SOUTHWEST PORTION OF THE SITE FAILS TO
 MEET THIS REQUIREMENT. THE LANDSCAPE AREA ADJACENT TO
 THE PASEO ON BROADWAY ALSO FAILS TO MEET THIS
 REQUIREMENT.
  
 69) THE CODE STATES THAT A LANDSCAPE STRIP, NOT TREE
 GRATES IS THE PREFERRED OPTION WHEN NO ON-STREET
 PARKING IS PROVIDED. 23RD STREET AND 25TH STREET HAVE
 NOT ON-STREET PARKING, SO A LANDSCAPE STRIP IS
 REQUIRED.
  
 70) THE CODE REQUIRES A MINIMUM UNOBSTRUCTED 60-INCH
 AREA FOR THE SIDEWALK. THE SITE PLAN FAILS TO SHOW THE
 EXISTING UTILITY POLES THAT ARE TO REMAIN ALONG 23RD
 STREET ADJACENT TO BUILDING B. THEY ARE SHOWN ON THE
 LANDSCAPE PLAN ? ENCROACHING INTO THE REQUIRED SIDEWALK
 WIDTH, OVERLAPPING THE TREE PITS AND IN CONFLICT WITH
 PROPOSED STREET TREE CANOPIES.
  
 71) THERE IS A TREE SHOWN WHERE THE EXISTING FIRE
 HYDRANT TO REMAIN IS SHOWN ON THE CIVIL PLAN IN FRONT
 OF BUILDING C.
  
 72) THERE ARE OAK TREES BEING SHOWN PLANTED ON TOP OF A
 GAS LINE ALONG NORTHWOOD ROAD. PLEASE PROVIDE THE DEPTH
 OF THE GAS LINE SO THAT STAFF CAN VERIFY THAT THERE IS
 NO CONFLICT.
  
 HISTORIC PRESERVATION FUND
  
 73) THIS PROJECT IS UTILIZING THE CORE SUBDISTRICT
 HISTORIC PRESERVATION HEIGHT BONUS. PLEASE PROVIDE THE
 AMOUNT OF SQUARE FOOTAGE BEING PROVIDED ABOVE THE
 80-FOOT BASE ZONING HEIGHT.
  
 PRIVATE OPEN SPACE
  
 74) PRIVATE OPEN SPACE REQUIREMENTS ? NO CALCULATIONS
 WERE PROVIDED. PRIVATE OPEN SPACES SHALL PROVIDE SHADED
 AREAS, AND THEIR GROUND SURFACE SHALL BE A COMBINATION
 OF PAVING MATERIALS, LAWN, OR GROUND COVER.
  
 75) BUILDING A IS A MIXED-USE TOWER BUILDING, SO IT IS
 REQUIRED TO PROVIDE A MINIMUM OF 10% COMMON, PRIVATE
 OPEN SPACE ON SITE. IT APPEARS THAT THE INTENT IS TO
 PROVIDE THE COMMON, PRIVATE OPEN SPACE ON THE ROOF OF
 THE PARKING DECK. PROVIDE VERIFICATION THAT THE MINIMUM
 AREA IS PROVIDED.
  
 76) BUILDING B IS A MIXED-USE FLEX BUILDING, SO IT IS
 REQUIRED TO PROVIDE A MINIMUM OF 10% COMMON, PRIVATE
 OPEN SPACE ON SITE. THE PLANS SHOW NO COMMON, PRIVATE
 OPEN SPACE PROVIDED FOR THIS BUILDING.
  
 77) BUILDING C IS A MIXED-USE FLEX BUILDING, SO IT IS
 REQUIRED TO PROVIDE A MINIMUM OF 10% COMMON, PRIVATE
 OPEN SPACE ON SITE. THE PLANS SHOW NO COMMON, PRIVATE
 OPEN SPACE PROVIDED FOR THIS BUILDING.
  
  

Review Stop Z ZONING
Rev No 1 Status F Date 11-18-2021 Cont ID  
Sent By eschneid Date 11-18-2021 Time 09:24 Rev Time 12.00
Received By eschneid Date 11-17-2021 Time 20:33 Sent To  
Notes
2021-11-17 20:39:37CASE NO. 1895
 NORTHWOOD COMMONS - NMUD ANCHOR SITE
 BROADWAY & 24TH STREET
  
 - CONTACT ERIC SCHNEIDER @ (561) 822-1446,
 [email protected]
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF FOUR
 (4) PAPER COPIES AND AN ELECTRONIC COPY IN .PNG FORMAT
 OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS
 TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL
 COMMENTS.
  
 - THE PPRC COMMENTS SHALL BE SUFFICIENTLY ADDRESSED AND
 SUBMITTED TO THE PLANNING DIVISION BY 5 PM ON FRIDAY,
 DECEMBER 3, 2021, TO BE ELIGIBLE TO BE SCHEDULED FOR
 THE JANUARY 18, 2022 PLANNING BOARD MEETING.
  
 - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT
 RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS
 FROM THE DATE OF THE PPRC MEETING (BY JANUARY 18,
 2022), THE PLANNING DIVISION MAY NOTIFY THE APPLICANT
 THAT THE CASE IS CONSIDERED WITHDRAWN. ANY FURTHER
 ACTION SHALL REQUIRE A NEW DEVELOPMENT APPLICATION.
  
 - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($600).
  
 - PUBLIC HEARING NOTIFICATION SIGNAGE SHALL BE POSTED
 IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION
 94-39(I)(5) OF THE ZONING AND LAND DEVELOPMENT
 REGULATIONS.
  
 PLANNING STAFF BEGAN A REVIEW OF THE PLANS AND BEGAN TO
 LIST DISCREPANCIES WITH THE ZONING AND LAND DEVELOPMENT
 REGULATIONS AND GENERAL ISSUES WITH THE QUALITY OF THE
 INFORMATION PRESENTED ON THE PLANS. AFTER IDENTIFYING
 OVER 30 COMMENTS, MANY WHICH WILL REQUIRE A REDESIGN OF
 THE PLANS, PLANNING STOPPED THE REVIEW. THE PLANS NEED
 TO BE CORRECTED TO COMPLY WITH THE CODE AND THE
 INTERNAL INCONSISTENCIES AMONG THE PLAN SHEETS. STAFF
 DID NOT FULLY VET OPEN SPACE, SETBACKS, STREETSCAPE,
 MECHANICAL SCREENING AND LANDSCAPE COMPLIANCE TO NAME A
 FEW, SO JUST BECAUSE COMMENTS WERE NOT ISSUED ABOUT A
 PARTICULAR ASPECT OF THE PLAN, DO NOT ASSUME IT
 COMPLIES. BASED ON WHAT STAFF HAS LISTED BELOW, STAFF
 IS CONFIDENT THAT THERE ARE ADDITIONAL CODE
 REQUIREMENTS THAT ARE NOT MET.
  
 1) THE BUILDING HEIGHT IS NOT BEING MEASURED CORRECTLY.
 IT DOES NOT START AT THE FINISHED FLOOR ELEVATION.
  
 2) BUILDING A DOES NOT COMPLY WITH THE MAXIMUM NUMBER
 OF STORIES AND BUILDING HEIGHT PERMITTED.
  
 A. THE MAXIMUM NUMBER OF STORIES PERMITTED WITHIN CORE
 PARCELS A & B IS 8 STORIES (WITH THE HEIGHT BONUS). THE
 BUILDING HAS 9 STORIES. IN ACCORDANCE WITH SECTION
 94-209.B.5., EACH PARKING GARAGE LEVEL AT THE FRONTAGE
 LINE(S) SHALL EQUAL ONE STORY FOR THE PURPOSES OF
 MEASURING BUILDING HEIGHT. THE PARKING GARAGE LEVEL
 THAT YOU ARE DESIGNATING AS A MEZZANINE IS NOT A
 MEZZANINE, IT IS A STORY SINCE IT IS ALONG MULTIPLE
 FRONTAGE LINES.
 B. THE MAXIMUM NUMBER OF STORIES/BUILDING HEIGHT
 PERMITTED WITHIN THE AREA SOUTH OF CORE PARCEL B IS 4
 STORIES/56 FEET. THE ENTIRE ROW OF UNITS ON THE SOUTH
 END OF THE BUILDING STARTING AT RESIDENCE LEVEL 4
 EXCEED THE PERMITTED NUMBER OF STORIES AND HEIGHT
 PERMITTED.
  
 3) BUILDING B DOES NOT COMPLY WITH THE NUMBER OF
 STORIES AND BUILDING HEIGHT PERMITTED.
  
 A. THE MAXIMUM NUMBER OF STORIES/BUILDING HEIGHT
 PERMITTED WITHIN THE HISTORICALLY DESIGNATED PORTION OF
 THE TRANSITION SUBDISTRICT IS 3 STORIES/44 FEET. THE
 BUILDING IN THIS AREA EXCEEDS THE PERMITTED NUMBER OF
 STORIES AND HEIGHT. IF THE GROUND LEVEL IS INTENDED TO
 CONTAIN A MEZZANINE THAT WOULD NOT COUNT AS A STORY,
 THEN COMPLETE FLOOR PLANS SHOWING HOW THIS IS IN
 REALITY A MEZZANINE MUST BE PROVIDED. THE CURRENT PLANS
 SHOW THIS AS A FULL FLOOR.
 B. THE MAXIMUM NUMBER OF STORIES PERMITTED WITHIN THE
 AREA SOUTH OF CORE PARCEL B IS 4 STORIES FEET. THE
 BUILDING IN THIS AREA EXCEEDS THE PERMITTED NUMBER OF
 STORIES. IF THE GROUND LEVEL IS INTENDED TO CONTAIN A
 MEZZANINE THAT WOULD NOT COUNT AS A STORY, THEN
 COMPLETE FLOOR PLANS SHOWING HOW THIS IS IN REALITY A
 MEZZANINE MUST BE PROVIDED. THE CURRENT PLANS SHOW THIS
 AS A FULL FLOOR.
  
 4) BUILDING C DOES NOT COMPLY WITH THE NUMBER OF
 STORIES AND BUILDING HEIGHT PERMITTED.
  
 A. THE MAXIMUM NUMBER OF STORIES/BUILDING HEIGHT
 PERMITTED WITHIN THE HISTORICALLY DESIGNATED PORTION OF
 THE TRANSITION SUBDISTRICT IS 3 STORIES/44 FEET. THE
 BUILDING IN THIS AREA EXCEEDS THE PERMITTED NUMBER OF
 STORIES AND HEIGHT. THE PLANS CLEARLY CALL OUT A
 2-STORY GROUND LEVEL.
 B. THE MAXIMUM NUMBER OF STORIES PERMITTED WITHIN THE
 AREA SOUTH OF CORE PARCEL B IS 4 STORIES FEET. THE
 BUILDING IN THIS AREA EXCEEDS THE PERMITTED NUMBER OF
 STORIES. THE PLANS CLEARLY CALL OUT A 2-STORY GROUND
 LEVEL.
  
 5) THERE ARE PLAN SHEETS THAT CONTINUE TO SHOW BUILDING
 C ENCROACHING INTO THE BROADWAY RIGHT-OF-WAY, WHICH IS
 NOT PERMITTED.
  
 6) THE GROUND FLOOR UNIT THAT WAS "CUT" TO AVOID
 ENCROACHING INTO THE BROADWAY RIGHT-OF-WAY WAS NOT
 UPDATED TO SHOW THE SQUARE FOOTAGE OR THAT IT EVEN
 FUNCTIONS.
  
 7) THE BUILDING A UNIT PLANS ARE INCOMPLETE. THERE ARE
 UNITS THAT HAVE NOT INFORMATION PROVIDED.
  
 8) THE ELEVATIONS FOR BUILDINGS B AND C DO NOT MATCH
 THE FLOOR PLANS.
  
 9) FULL FLOOR PLANS FOR BUILDINGS B AND C ARE REQUIRED
 FOR STAFF TO SEE HOW THE BUILDINGS FUNCTION AS SHOWN.
  
 10) PROVIDE A TRAFFIC PERFORMANCE STANDARDS APPROVAL
 LETTER FROM THE PALM BEACH COUNTY TRAFFIC DIVISION FOR
 THE FULL SCOPE OF THE PROPOSED DEVELOPMENT.
  
 11) THE NUMBER OF UNITS AND THE NON-RESIDENTIAL SQUARE
 FOOTAGE LISTED IN THE TRAFFIC IMPACT ANALYSIS DO NOT
 MATCH THE SITE DATA ON THE PLANS. THE TRAFFIC IMPACT
 ANALYSIS MUST REFLECT THE FULL SCOPE OF THE
 DEVELOPMENT.
  
 12) PROVIDE A PREDETERMINATION LETTER FROM FDOT FOR THE
 IMPROVEMENTS WITHIN THE FDOT RIGHTS-OF-WAY OF BROADWAY
 AND 25TH STREET ADJACENT TO THE PROJECT.
  
 13) PROVIDE THE LETTER FROM COMCAST CONFIRMING THAT THE
 PROPOSED PROJECT DOES NOT ENCROACH INTO THEIR EASEMENTS
 OR OTHERWISE INTERFERE WITH THE PROVISIONS OF THEIR
 SERVICES.
  
 14) SECTION 94-209.J.1.C REQUIRES THAT PROJECTS WITH
 THREE OR MORE DISTINCTLY SEPARATE BUILDINGS HAVE
 SUBSTANTIALLY DIFFERENT FRONT ELEVATIONS. SUBSTANTIALLY
 DIFFERENT FRONT ELEVATIONS SHALL INCLUDE BUT NOT BE
 LIMITED TO VARIATIONS IN FENESTRATION, MATERIAL,
 MASSING AND COLOR. THE PLANS AND NARRATIVE MUST VERIFY
 THAT THE BUILDINGS COMPLY WITH THIS REQUIREMENT.
  
 15) SHEET A404 SHOWS BUILDING C AS HAVING 4 EAST
 ELEVATIONS. WHAT SHOULD BE LABELED AS THE NORTH AND
 SOUTH ELEVATIONS DO NOT ALIGN WITH THE KEY PLAN.
  
 16) SHEET A405 SHOWS BUILDING B AS HAVING 4 SOUTH
 ELEVATIONS.
  
 17) THE CITY'S MIXED USE DISTRICT DEFINES OPEN SPACE AS
 AN IMPROVED OUTDOOR AREA OPEN TO THE SKY. FIGURE VII-3
 DESIGNATED PUBLIC OPEN SPACES AND GREENWAY REGULATING
 PLAN REQUIRES PUBLIC OPEN SPACE WHERE 24TH STREET IS
 PROPOSED FOR ABANDONMENT. THE DESIGN OF THE PROJECT
 DOES NOT HAVE THIS AREA COMPLY WITH THE OPEN SPACE
 DEFINITION; THEREFORE, THIS AREA DOES NOT COMPLY WITH
 THE CODE REQUIREMENT.
  
 18) THE ENTRANCES TO THE SURFACE AND GARAGE PARKING
 AREAS EXCEED THE MAXIMUM PERMITTED 24 FEET IN WIDTH.
  
 19) ALL LEVELS OF THE PARKING GARAGE MUST BE SCREENED
 BY A LINER BUILDING CONTAINING A MINIMUM DEPTH OF
 HABITABLE SPACE. STAFF RECOGNIZES THAT A VARIANCE TO
 THIS PROVISION HAS BEEN PROVIDED, BUT STAFF DOES NOT
 SUPPORT THE WAIVER REQUEST.
  
 20) PROVIDE VERIFICATION THAT THE PARKING GARAGE HAS
 DIRECT PEDESTRIAN ACCESS TO A PUBLIC WALKWAY.
  
 21) SECTION 94-209.F.1.E REQUIRES A LANDSCAPE BUFFER
 STRIP OF AT LEAST FIVE FEET WIDE SHALL BE PROVIDED
 ALONG THE ENTIRE EDGE OF A PROPERTY ABUTTING A RAILROAD
 RIGHT-OF-WAY. THE REQUIRED BUFFER HAS NOT BEEN
 PROVIDED. PLANNING STAFF WILL NOT SUPPORT A WAIVER OF
 THIS REQUIREMENT.
  
 22) NO DETAILS WERE PROVIDED ON THE SITE LIGHTING TO
 VERIFY COMPLIANCE WITH THE NMUD REGULATIONS.
  
 23) PROVIDE HOW THE STOREFRONTS AT THE ABANDONED
 PORTION OF 24TH STREET ARE BE DIRECTLY ACCESSIBLE FROM
 A STREET FRONTAGE, URBAN GREENWAY OR PUBLIC,
 SEMI-PUBLIC OR PRIVATE OPEN SPACE, GIVEN THAT THE
 ABANDONED PORTION OF 24TH STREET DOES NOT MEET ANY OF
 THESE DEFINITIONS.
  
 24) NO INFORMATION WAS PROVIDED TO VERIFY THE ACTIVE
 USE STANDARDS, THE FACADE ARTICULATION REQUIREMENTS,
 THE ARCHITECTURAL TREATMENT STANDARDS OR THE
 FENESTRATION STANDARDS.
  
 25) NMUD DOES NOT PERMIT DWELLING UNITS CONTAINING LESS
 THAN 550 SQUARE FEET, YET THE UNIT MATRIX SHOWS AT
 LEAST 36 UNITS FAILING TO MEET THIS STANDARD.
  
 26) DEAD END PARKING ROWS ARE NOT PERMITTED WITHOUT A
 TURNAROUND SPACE. THERE ARE NUMEROUS THROUGHOUT THE
 GARAGE.
  
 27) THE PARKING SPACES AT THE TOP OF THE RAMPS ARE
 UNSAFE GIVEN THE SLOPE OF THE RAMPS.
  
 28) DESCRIBE WHO WILL USE THE TANDEM SPACES.
  
 29) THERE ARE MISLABELED DIMENSION TAGS IN THE GARAGE.
  
 30) THERE ARE STAIRS THAT DIRECTLY ENCROACH PARKING
 SPACES AND DOORWAYS THAT CANNOT BE ACCESSED IF A CAR IS
 PARKED IN THE SPACE IN FRONT OF THE DOOR.
  
 31) NO DETAILS ON THE BICYCLE PARKING WAS PROVIDED,
 BOTH FOR THE BICYCLE STORAGE ROOM AND THE STREET
 BICYCLE PARKING.
  
 32) THE VEHICLE LOADING/SERVICE AREAS MAY NOT USE CITY
 RIGHTS-OF-WAY FOR MANEUVERING.
  
 33) THE ARCHITECTURAL PLANS SHOW SUPPORT COLUMNS
 LOCATED WITHIN PINEWOOD AVENUE, WHICH IS NOT PERMITTED.
 PROVIDE PLANS THAT SHOW THE LOCATIONS OF THE STRUCTURAL
 COLUMNS THAT ARE REQUIRED TO SUPPORT THE SPANS ACROSS
 PINEWOOD AVENUE AND THE ABANDONED PORTION OF 25TH
 STREET SO THAT STAFF CAN EVALUATE THE IMPACTS ON THE AT
 GRADE LAYOUT.
  
 34) THE INVITATION TO NEGOTIATE FOR THIS PROJECT
 INCLUDED THE FOLLOWING LANGUAGE, "TRIRAIL COASTAL LINK
 THE SOUTH FLORIDA REGIONAL TRANSIT AUTHORITY (SFRTA),
 ALONG WITH STATE, REGIONAL AND LOCAL PARTNERS, IS
 PLANNING THE CREATION OF A TRIRAIL COASTAL LINK RAIL
 CONNECTION ALONG THE FEC RAILWAY FROM MIAMI TO JUPITER.
 IN PREVIOUS PLANS THE ANCHOR SITE WAS CONSIDERED AS ONE
 OF THE POTENTIAL LOCATIONS FOR A FUTURE TRI-RAIL STOP.
 CURRENT PLANS DO NOT INCLUDE THE ANCHOR SITE IN "PHASE
 1"? OF THE RAIL CONNECTION; HOWEVER, DEVELOPMENT ON
 THIS SITE SHOULD CONSIDER THE POSSIBILITY OF A FUTURE
 STOP AND DEVELOPERS WOULD BE ENCOURAGED TO SUPPORT THE
 RAIL CONNECTION AT THIS LOCATION. THE CRA'S NORTH END
 VISION CONSIDERS THE ANCHOR SITE AS A PRIME RAIL STOP
 LOCATION. CURRENT LOCATIONS AND STUDIES CAN BE LOCATED
 AT HTTP://TRI-RAILCOASTALLINK.COM/." EXPLAIN HOW THE
 PLANS PROVIDE A CONNECTION AT THIS LOCATION.
  

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved