| 2021-08-11 14:05:19 | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES |
| | DEPT., 561-494-1098 [email protected] : |
| | |
| | NO COMMENTS. |
| | |
| | COMMENTS PER MARK HURLEY, CITY OF WPB PUB. UTIL. FIELD |
| | CUSTOMER SVC. SUPV., [email protected]. 561-822-2262: |
| | |
| | -ENGINEERING PLAN IS DATED FROM 2018 AND INCLUDES WATER |
| | SERVICE STANDARD DETAILS THAT ARE OLD REVISION OR NO |
| | LONGER STANDARD. PLEASE UPDATE PLANS TO REFLECT CURRENT |
| | WATER SERVICE STANDARD DETAILS. |
| | -PLEASE ENSURE ALL WATER MAINS WILL HAVE UTILITY |
| | EASEMENTS. FOR INSTANCE, THE 8 INCH DIP WATER MAIN |
| | ACROSS BANEBERRY LANE FROM LOT 19 DOES NOT SEEM TO HAVE |
| | ONE. |
| | -NEW HOUSES IN OTHER SECTIONS OF BANYAN CAY ARE GETTING |
| | ELECTRIC TRANSFORMERS INSTALLED ON PADS IN FRONT OF |
| | HOUSES IN UTILITY EASEMENT, BUT DO NOT SEEM ANY ON THE |
| | ENGINEERING PLAN. PLEASE ADD ANY PROPOSED TRANSFORMERS |
| | TO PLANS AND MAKE SURE SPACED ADEQUATELY FROM WATER |
| | SERVICES AND METERS. |
| | |
| | COMMENTS PER MIKE TECHNOW, CITY OF WPB PUBLIC UTILITIES |
| | - 561-494-1047 OR [email protected]: |
| | |
| | ADDITIONAL COMMENTS TO THE STANDARDS: |
| | -PER CORRESPONDENCE WITH THE CITY A CONSULTANT WILL BE |
| | RETAINED FOR DESIGN OF LIFT STATION. |
| | -INCLUDED LEVEL OF SERVICE CALCULATIONS. WILL NEED TO |
| | WORK WITH THE CITY TO OBTAIN UPDATED FLOW DATA. |
| | -MAINTAIN A MINIMUM HORIZONTAL SEPARATION OF 5? FROM |
| | TREE ROOT BARRIERS TO CITY OWNED UTILITIES. SHOW ON |
| | LANDSCAPING PLAN OR TYPICAL CROSS SECTION DETAIL. |
| | -CALL OUT UTILITY EASEMENTS. |
| | -CALL OUT HORIZONTAL SEPARATION FROM PROPOSED GRAVITY |
| | MAIN AND WATER MAIN. 5? MINIMUM FOR O.D. TO O.D. |
| | -CALL OUT FITTINGS AT CURVE. |
| | -SHOW PROPOSED/EXISTING DRY UTILITIES AND EASEMENTS. |
| | -CALL OUT TWO SINGLE SERVICES INSTEAD OF DOUBLE WITH |
| | SHARP ANGLE. |
| | -INCLUDE MINIMUM 10? UTILITY EASEMENT FOR PIPE NOT IN |
| | R/W. |
| | -FOR SEWER LATERALS EXCEEDING 75? WILL NEED ADDITIONAL |
| | CLEANOUT. |
| | -SHEET 5 MISSING UTILITY EASEMENT. |
| | -CALL OUT THE POINT OF SERVICE. PRIVATE SYSTEM FROM |
| | WHERE? |
| | -ON SHEET 3 PROVIDED ADDITION 10? GATE VALVE, CONSIDER |
| | DOUBLE VALVE AT CONNECTION TO EXISTING SYSTEM. |
| | -MAINTENANCE ACCESS TO CITY OWNED UTILITIES UNDER |
| | REVIEW. |
| | -PROPOSED WATER AND SEWER WILL COMPLY WITH THE LATEST |
| | REVISIONS TO STANDARDS AND SPECIFICATIONS. |
| | |