Plan Review Details - Project Z21070018
| Plan Review Stops For Project Z21070018 |
| Review Stop |
AIPP |
ART IN PUBLIC PLACES |
| Rev No |
1 |
Status |
F |
Date |
11-10-2021 |
|
|
Cont ID |
|
| Sent By |
scwelter |
Date |
11-10-2021 |
Time |
15:55 |
Rev Time |
0.00 |
| Received By |
scwelter |
Date |
01-19-2022 |
Time |
14:13 |
Sent To |
|
|
| Notes |
| 2022-01-19 12:58:54 | -TWO MANHOLES IN ALLEY APPEAR TO BE OVERLAPPING ON | | | CIVIL PLAN. PLEASE ENSURE MANHOLES HAVE ADEQUATE | | | CLEARANCE DISTANCE. | | | | | | -WATER SERVICE SHOWN AT NORTH SIDE OF 300 BANYAN | | | PROPERTY HAS NO EXISTING WATER METER INSTALLED. IF IT | | | REMAINS AFTER BANYAN STREETSCAPE PROJECT WOULD HAVE TO | | | COORDINATE METER INSTALLATION AND ACCOUNT SETUP WITH | | | CITY WPB, AND PAY ALL APPLICABLE FEES, DEPOSITS, AND | | | CHARGES. | | | | | | -PROPOSED METERED IRRIGATION WATER SERVICE AT NORTH | | | SIDE OF PROPERTY DOES NOT SHOW PROPOSED BACKFLOW | | | ASSEMBLY INSTALLATION. BACKFLOW ASSEMBLY WOULD HAVE TO | | | BE INSTALLED FOR THE WATER SERVICE TO BE USED, AND MUST | | | BE AT LOCATION APPROVED BY WPB PUBLIC UTILITIES. | | | | | | -VERTICAL MOUNT DCDA FIRELINE BACKFLOW ASSEMBLY IS | | | NONSTANDARD. WOULD REQUIRE ENGINEER DESIGN AND | | | EVALUATION. PROPOSED BACKFLOW ASSEMBLY MAKE/MODEL WOULD | | | HAVE TO BE USC-APPROVED FOR VERTICAL ORIENTATION. | | | | | | -SITE PLAN SAYS FIRELINE BACKFLOW ASSEMBLY IS LOCATED | | | IN AN OUTDOOR STORAGE ROOM AND APPEARS TO HAVE OPEN | | | ENTRY. RECOMMEND VERIFYING LOCATION IS ACCEPTABLE TO | | | FIRE DEPARTMENT AND MEETS NFPA STANDARDS. | | | | | | -SITE AND LANDSCAPING PLANS NEEDS TO BE UPDATED TO SHOW | | | RELOCATION OF BIKE RACK NEAR THE WATER METER FOR 300 | | | BANYAN AT SOUTH SIDE OF PROPERTY. CIVIL PLANS SHOW IT | | | REMOVED ALRIGHT. (NOT SURE IF THEY SHOW THE NEW | | | LOCATION) | | | | | | -PROPOSED 3 INCH BFP AND METER FOR 301 CLEMATIS ST. IS | | | LOCATED SUBSTANTIALLY CLOSE TO EXISTING BUILDING. | | | CONCERN WAS BROUGHT UP ABOUT BUILDING FOOTERS AND | | | EXCAVATION ADJACENT BUILDING. EOR SUGGESTED DIMENSIONS | | | OF BUILDING FOOTER AND SAFETY OF EXCAVATION COULD BE | | | CONFIRMED. PLEASE SUBMIT THOSE VERIFICATIONS AT FORMAL | | | ENGINEERING SUBMITTAL. | | | | | | -PROPOSED 3 INCH METER FOR 301 CLEMATIS ST. MUST BE | | | INSTALLED ABOVE-GROUND IN CONFORMANCE TO WPB SD WS-3 | | | SEP2019. | | | | | | -PROPOSED 3 INCH METERED WATER SERVICE FOR 301 CLEMATIS | | | ST. IS NONSTANDARD DESIGN. MAY NEED REVISION AT FORMAL | | | ENGINEERING SUBMITTAL. | | | | | | -PROPOSED 3 INCH BACKFLOW ASSEMBLY FOR 301 CLEMATIS ST. | | | APPEARS TO BE IN THE RIGHT OF WAY. RECOMMEND VERIFYING | | | LOCATION IS ACCEPTABLE WITH DEVELOPMENT SERVICES. | | | | | | -PLANS DO NOT SHOW EXISTING LARGE DIAMETER FIRELINE | | | WATER SERVICE OR DCDA FIRELINE BACKFLOW INSTALLATION AT | | | 301 CLEMATIS ST. SHOW BOTH AT FORMAL ENGINEERING | | | SUBMITTAL. | | | | | | -PROPOSED 4 INCH PARALLEL RPZ MAY HAVE BIGGER FOOTPRINT | | | THAN SHOWN ON CIVIL PLANS. | | | | | | -CIVIL PLANS DO NOT SHOW CROSSING INFORMATION OR | | | PROFILES FOR UTILITY WORK IN ALLEY. WHEN REVIEWED AT | | | FORMAL ENGINEERING SUBMITTAL, IF THERE ARE ANY | | | CONFLICTS, ADDITIONAL WORK OR PLAN REVISION MAY BE | | | NEEDED. | | | | | | -CIVIL PLANS DO NOT COMMUNICATE PROPOSED LOCATION FOR 2 | | | INCH BFP AT EAST SIDE OF 301 CLEMATIS AND WHAT IS | | | HAPPENING TO THE ASSOCIATED WATER METER. ANY PROPOSED | | | LOCATION MUST BE REVIEWED BY PUBLIC UTILITIES AND | | | RETEST/REINSPECTION WOULD BE REQUIRED. | | | | | | -CIVIL PLANS SHOW EXSS AND EXDN FLOWING TO ONE MANHOLE | | | IN OLIVE. EOR NEEDS TO VERIFY IF THIS IS ACCURATE AND | | | UPDATE PLANS AS NEEDED. | | | | | | -EXISTING METERED WATER SERVICES TO 301 CLEMATIS ST. | | | BUILDING ARE NOT SHOWN AND LABELED ON WATER PLAN WITH | | | WHAT IS HAPPENING TO THEM. UPDATE AT FORMAL ENGINEERING | | | SUBMITTAL. | | | | | | -PLANS ARE MISSING SEVERAL STANDARD DETAILS INCLUDING | | | SMALL METERED WATER SERVICE, LARGE METERED WATER | | | SERVICE, AND FIRELINE BACKFLOW ASSEMBLY. ADD AT FORMAL | | | ENGINEERING SUBMITTAL. | | | | | | -PLANS FOR EXISTING OVERHEAD UTILITIES AND UTILITY | | | POLES ALONG THE ALLEYWAY WERE PREVIOUSLY UNCERTAIN. | | | NEWEST REVISION PLANS STILL DO NOT SEEM TO ACCOUNT FOR | | | THEM, OR DETAIL WHAT IS HAPPENING TO THEM. | | | | | 2022-01-19 12:56:20 | ENGINEERING | | | -TWO MANHOLES IN ALLEY APPEAR TO BE OVERLAPPING ON | | | CIVIL PLAN. PLEASE ENSURE MANHOLES HAVE ADEQUATE | | | CLEARANCE DISTANCE. | | | | | | -WATER SERVICE SHOWN AT NORTH SIDE OF 300 BANYAN | | | PROPERTY HAS NO EXISTING WATER METER INSTALLED. IF IT | | | REMAINS AFTER BANYAN STREETSCAPE PROJECT WOULD HAVE TO | | | COORDINATE METER INSTALLATION AND ACCOUNT SETUP WITH | | | CITY WPB, AND PAY ALL APPLICABLE FEES, DEPOSITS, AND | | | CHARGES. | | | | | | -PROPOSED METERED IRRIGATION WATER SERVICE AT NORTH | | | SIDE OF PROPERTY DOES NOT SHOW PROPOSED BACKFLOW | | | ASSEMBLY INSTALLATION. BACKFLOW ASSEMBLY WOULD HAVE TO | | | BE INSTALLED FOR THE WATER SERVICE TO BE USED, AND MUST | | | BE AT LOCATION APPROVED BY WPB PUBLIC UTILITIES. | | | | | | -VERTICAL MOUNT DCDA FIRELINE BACKFLOW ASSEMBLY IS | | | NONSTANDARD. WOULD REQUIRE ENGINEER DESIGN AND | | | EVALUATION. PROPOSED BACKFLOW ASSEMBLY MAKE/MODEL WOULD | | | HAVE TO BE USC-APPROVED FOR VERTICAL ORIENTATION. | | | | | | -SITE PLAN SAYS FIRELINE BACKFLOW ASSEMBLY IS LOCATED | | | IN AN OUTDOOR STORAGE ROOM AND APPEARS TO HAVE OPEN | | | ENTRY. RECOMMEND VERIFYING LOCATION IS ACCEPTABLE TO | | | FIRE DEPARTMENT AND MEETS NFPA STANDARDS. | | | | | | -SITE AND LANDSCAPING PLANS NEEDS TO BE UPDATED TO SHOW | | | RELOCATION OF BIKE RACK NEAR THE WATER METER FOR 300 | | | BANYAN AT SOUTH SIDE OF PROPERTY. CIVIL PLANS SHOW IT | | | REMOVED ALRIGHT. (NOT SURE IF THEY SHOW THE NEW | | | LOCATION) | | | | | | -PROPOSED 3 INCH BFP AND METER FOR 301 CLEMATIS ST. IS | | | LOCATED SUBSTANTIALLY CLOSE TO EXISTING BUILDING. | | | CONCERN WAS BROUGHT UP ABOUT BUILDING FOOTERS AND | | | EXCAVATION ADJACENT BUILDING. EOR SUGGESTED DIMENSIONS | | | OF BUILDING FOOTER AND SAFETY OF EXCAVATION COULD BE | | | CONFIRMED. PLEASE SUBMIT THOSE VERIFICATIONS AT FORMAL | | | ENGINEERING SUBMITTAL. | | | | | | -PROPOSED 3 INCH METER FOR 301 CLEMATIS ST. MUST BE | | | INSTALLED ABOVE-GROUND IN CONFORMANCE TO WPB SD WS-3 | | | SEP2019. | | | | | | -PROPOSED 3 INCH METERED WATER SERVICE FOR 301 CLEMATIS | | | ST. IS NONSTANDARD DESIGN. MAY NEED REVISION AT FORMAL | | | ENGINEERING SUBMITTAL. | | | | | | -PROPOSED 3 INCH BACKFLOW ASSEMBLY FOR 301 CLEMATIS ST. | | | APPEARS TO BE IN THE RIGHT OF WAY. RECOMMEND VERIFYING | | | LOCATION IS ACCEPTABLE WITH DEVELOPMENT SERVICES. | | | | | | -PLANS DO NOT SHOW EXISTING LARGE DIAMETER FIRELINE | | | WATER SERVICE OR DCDA FIRELINE BACKFLOW INSTALLATION AT | | | 301 CLEMATIS ST. SHOW BOTH AT FORMAL ENGINEERING | | | SUBMITTAL. | | | | | | -PROPOSED 4 INCH PARALLEL RPZ MAY HAVE BIGGER FOOTPRINT | | | THAN SHOWN ON CIVIL PLANS. | | | | | | -CIVIL PLANS DO NOT SHOW CROSSING INFORMATION OR | | | PROFILES FOR UTILITY WORK IN ALLEY. WHEN REVIEWED AT | | | FORMAL ENGINEERING SUBMITTAL, IF THERE ARE ANY | | | CONFLICTS, ADDITIONAL WORK OR PLAN REVISION MAY BE | | | NEEDED. | | | | | | -CIVIL PLANS DO NOT COMMUNICATE PROPOSED LOCATION FOR 2 | | | INCH BFP AT EAST SIDE OF 301 CLEMATIS AND WHAT IS | | | HAPPENING TO THE ASSOCIATED WATER METER. ANY PROPOSED | | | LOCATION MUST BE REVIEWED BY PUBLIC UTILITIES AND | | | RETEST/REINSPECTION WOULD BE REQUIRED. | | | | | | -CIVIL PLANS SHOW EXSS AND EXDN FLOWING TO ONE MANHOLE | | | IN OLIVE. EOR NEEDS TO VERIFY IF THIS IS ACCURATE AND | | | UPDATE PLANS AS NEEDED. | | | | | | -EXISTING METERED WATER SERVICES TO 301 CLEMATIS ST. | | | BUILDING ARE NOT SHOWN AND LABELED ON WATER PLAN WITH | | | WHAT IS HAPPENING TO THEM. UPDATE AT FORMAL ENGINEERING | | | SUBMITTAL. | | | | | | -PLANS ARE MISSING SEVERAL STANDARD DETAILS INCLUDING | | | SMALL METERED WATER SERVICE, LARGE METERED WATER | | | SERVICE, AND FIRELINE BACKFLOW ASSEMBLY. ADD AT FORMAL | | | ENGINEERING SUBMITTAL. | | | | | | -PLANS FOR EXISTING OVERHEAD UTILITIES AND UTILITY | | | POLES ALONG THE ALLEYWAY WERE PREVIOUSLY UNCERTAIN. | | | NEWEST REVISION PLANS STILL DO NOT SEEM TO ACCOUNT FOR | | | THEM, OR DETAIL WHAT IS HAPPENING TO THEM. | | | | | 2021-11-10 15:56:25 | PUBLIC ART REQUIREMENT: | | | TOTAL CONSTRUCTION COSTS OF THIS DEVELOPMENT ARE OVER | | | $500,000 IT IS SUBJECT TO THE PUBLIC ART REQUIREMENT AS | | | PER CITY ORDINANCE. | | | SECTION 78-129: ALL PRIVATE DEVELOPMENT PROJECTS, | | | INCLUDING NEW CONSTRUCTION, OR THE RENOVATION OR | | | IMPROVEMENT OF AN EXISTING BUILDING, WHERE TOTAL | | | CONSTRUCTION COSTS ARE EQUAL TO OR GREATER THAN | | | $500,000 ARE SUBJECT TO THE PUBLIC ART REQUIREMENT. | | | OPTION 1: INSTALL ARTWORK ON THE DEVELOPMENT SITE | | | VALUED IN AN AMOUNT NOT LESS THAN ONE PERCENT OF THE | | | TOTAL CONSTRUCTION COSTS; OR | | | OPTION 2: CONTRIBUTE AN AMOUNT EQUAL TO 75 PERCENT OF | | | ONE PERCENT OF THE TOTAL CONSTRUCTION COSTS FOR DEPOSIT | | | TO THE PUBLIC ART ACCOUNT. | | | A COMPLETED PUBLIC ART ASSESSMENT APPLICATION IS | | | REQUIRED AT TIME OF BUILDING PERMIT SUBMITTAL. | | | | | | CONTACT SYBILLE WELTER, ADMINISTRATOR OF PUBLIC ART & | | | CULTURE AT [email protected] TO OBTAIN AN ART ASSESSMENT | | | APPLICATION AND REVIEW THE REQUIREMENTS. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
08-11-2021 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
08-11-2021 |
Time |
20:46 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
08-11-2021 |
Time |
20:46 |
Sent To |
|
|
| Notes |
| 2021-08-11 20:53:40 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. DEMOLITION OF THE EXISTING BUILDING. AN ASBESTOS | | | SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT | | | REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH | | | COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963, | | | OR BY EMAIL: [email protected] | | | | | | 3. NUMBER OF ACCESSIBLE PARKING SPACES. ACCESSIBLE | | | PARKING SPACES ARE SHOWN ON THE PLANS BUT A COUNT OF | | | TOTAL PROPOSED PARKING SPACES COULD NOT BE FOUND, AND | | | THAT WILL DETERMINE THE REQUIRED NUMBER OF ACCESSIBLE | | | PARKING SPACES. THE MINIMUM NUMBER OF ACCESSIBLE | | | PARKING SPACES PROVIDED SHALL BE IN ACCORDANCE WITH | | | SECTION 208.2 OF FLORIDA ACCESSIBILITY CODE. | | | | | | 4. VAN ACCESSIBLE PARKING SPACES. SEE COMMENT 3, ABOVE. | | | PER SECTION 208.2.4 OF FLORIDA ACCESSIBILITY CODE, ONE | | | IN EVERY SIX REQUIRED ACCESSIBLE SPACES (AT LEAST ONE) | | | IN A PARKING STRUCTURE, SHALL BE ?VAN ACCESSIBLE? AND | | | DESIGNED IN ACCORDANCE WITH SECTION OF 502 OF FLORIDA | | | ACCESSIBILITY CODE (VERTICAL CLEARANCE NOT LESS THAN 98 | | | INCHES AT SPACE AND VEHICULAR ACCESS ROUTE) | | | | | | 5. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 6. ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE DOES | | | NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL OPENINGS TO | | | MEET THE DEFINITION OF AN OPEN PARKING GARAGE, IT WILL | | | BE CONSIDERED AN ENCLOSED PARKING GARAGE AND MUST HAVE | | | EXHAUST SYSTEMS. THE EXHAUST SYSTEMS SHALL BE DESIGNED | | | TO MINIMIZE NOISE LEVELS USING INLINE FAN SILENCERS OR | | | OTHER APPROVED METHODS. | | | | | | 7. GREASE INTERCEPTOR. IF ANY OF THE RETAIL TENANTS ARE | | | TO BE RESTAURANTS GREASE INTERCEPTORS WILL BE REQUIRED. | | | FOR INFORMATION ON THE REQUIRED TYPE, SIZE AND | | | LOCATION, PLEASE CONTACT TIM LARGE, CHIEF PLUMBING | | | INSPECTOR, DEVELOPMENT SERVICES DEPARTMENT, AT (561) | | | 805-6692, OR BY EMAIL: [email protected] | | | | | | 8. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS, | | | GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND | | | OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS, | | | SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC. | | | | | | 9. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND | | | CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF | | | CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL | | | NEIGHBORING PROPERTIES. | | | | | | 10. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER | | | AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY, | | | INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE | | | CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF | | | NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION | | | THAT MAY AFFECT THE USE OF THEIR PROPERTY. | | | | | | 11. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT | | | WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL | | | HAVE A SEPARATE ADDRESS ASSIGNED BASED ON THE LOCATION | | | OF THE BUILDING ENTRANCE. FOR STREET ADDRESSING, | | | CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT | | | (561) 805 6659, OR BY EMAIL: [email protected] | | | | | | 12. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT | | | TO ART LIFE ASSESSMENT UNDER THE CITY OF WEST PALM | | | BEACH ART IN PUBLIC PLACES (AIPP) PROGRAM. FOR ADVICE | | | ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP | | | ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC | | | PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL: | | | [email protected] | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
4 |
Status |
P |
Date |
01-27-2022 |
|
|
Cont ID |
|
| Sent By |
LDeloren |
Date |
01-27-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
ldeloren |
Date |
01-27-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-01-19 13:02:29 | ENGINEERING | | | | | | CONDITION OF APPROVAL: -PROPOSED 3 INCH METER FOR 301 | | | CLEMATIS ST. MUST BE INSTALLED ABOVE-GROUND IN | | | CONFORMANCE TO WPB SD WS-3 SEP2019.-TWO MANHOLES IN | | | ALLEY APPEAR TO BE OVERLAPPING ON CIVIL PLAN. PLEASE | | | ENSURE MANHOLES HAVE ADEQUATE CLEARANCE DISTANCE. | | | | | | ALL OTHER COMMENTS SHALL BE ADDRESSED DURING FORMAL | | | ENGINEERING SUBMITTAL. | | | | | | -WATER SERVICE SHOWN AT NORTH SIDE OF 300 BANYAN | | | PROPERTY HAS NO EXISTING WATER METER INSTALLED. IF IT | | | REMAINS AFTER BANYAN STREETSCAPE PROJECT WOULD HAVE TO | | | COORDINATE METER INSTALLATION AND ACCOUNT SETUP WITH | | | CITY WPB, AND PAY ALL APPLICABLE FEES, DEPOSITS, AND | | | CHARGES. | | | | | | -PROPOSED METERED IRRIGATION WATER SERVICE AT NORTH | | | SIDE OF PROPERTY DOES NOT SHOW PROPOSED BACKFLOW | | | ASSEMBLY INSTALLATION. BACKFLOW ASSEMBLY WOULD HAVE TO | | | BE INSTALLED FOR THE WATER SERVICE TO BE USED, AND MUST | | | BE AT LOCATION APPROVED BY WPB PUBLIC UTILITIES. | | | | | | -VERTICAL MOUNT DCDA FIRELINE BACKFLOW ASSEMBLY IS | | | NONSTANDARD. WOULD REQUIRE ENGINEER DESIGN AND | | | EVALUATION. PROPOSED BACKFLOW ASSEMBLY MAKE/MODEL WOULD | | | HAVE TO BE USC-APPROVED FOR VERTICAL ORIENTATION. | | | | | | -SITE PLAN SAYS FIRELINE BACKFLOW ASSEMBLY IS LOCATED | | | IN AN OUTDOOR STORAGE ROOM AND APPEARS TO HAVE OPEN | | | ENTRY. RECOMMEND VERIFYING LOCATION IS ACCEPTABLE TO | | | FIRE DEPARTMENT AND MEETS NFPA STANDARDS. | | | | | | -SITE AND LANDSCAPING PLANS NEEDS TO BE UPDATED TO SHOW | | | RELOCATION OF BIKE RACK NEAR THE WATER METER FOR 300 | | | BANYAN AT SOUTH SIDE OF PROPERTY. CIVIL PLANS SHOW IT | | | REMOVED ALRIGHT. (NOT SURE IF THEY SHOW THE NEW | | | LOCATION) | | | | | | -PROPOSED 3 INCH BFP AND METER FOR 301 CLEMATIS ST. IS | | | LOCATED SUBSTANTIALLY CLOSE TO EXISTING BUILDING. | | | CONCERN WAS BROUGHT UP ABOUT BUILDING FOOTERS AND | | | EXCAVATION ADJACENT BUILDING. EOR SUGGESTED DIMENSIONS | | | OF BUILDING FOOTER AND SAFETY OF EXCAVATION COULD BE | | | CONFIRMED. PLEASE SUBMIT THOSE VERIFICATIONS AT FORMAL | | | ENGINEERING SUBMITTAL. | | | | | | | | | -PROPOSED 3 INCH METERED WATER SERVICE FOR 301 CLEMATIS | | | ST. IS NONSTANDARD DESIGN. MAY NEED REVISION AT FORMAL | | | ENGINEERING SUBMITTAL. | | | | | | -PROPOSED 3 INCH BACKFLOW ASSEMBLY FOR 301 CLEMATIS ST. | | | APPEARS TO BE IN THE RIGHT OF WAY. RECOMMEND VERIFYING | | | LOCATION IS ACCEPTABLE WITH DEVELOPMENT SERVICES. | | | | | | -PLANS DO NOT SHOW EXISTING LARGE DIAMETER FIRELINE | | | WATER SERVICE OR DCDA FIRELINE BACKFLOW INSTALLATION AT | | | 301 CLEMATIS ST. SHOW BOTH AT FORMAL ENGINEERING | | | SUBMITTAL. | | | | | | -PROPOSED 4 INCH PARALLEL RPZ MAY HAVE BIGGER FOOTPRINT | | | THAN SHOWN ON CIVIL PLANS. | | | | | | -CIVIL PLANS DO NOT SHOW CROSSING INFORMATION OR | | | PROFILES FOR UTILITY WORK IN ALLEY. WHEN REVIEWED AT | | | FORMAL ENGINEERING SUBMITTAL, IF THERE ARE ANY | | | CONFLICTS, ADDITIONAL WORK OR PLAN REVISION MAY BE | | | NEEDED. | | | | | | -CIVIL PLANS DO NOT COMMUNICATE PROPOSED LOCATION FOR 2 | | | INCH BFP AT EAST SIDE OF 301 CLEMATIS AND WHAT IS | | | HAPPENING TO THE ASSOCIATED WATER METER. ANY PROPOSED | | | LOCATION MUST BE REVIEWED BY PUBLIC UTILITIES AND | | | RETEST/REINSPECTION WOULD BE REQUIRED. | | | | | | -CIVIL PLANS SHOW EXSS AND EXDN FLOWING TO ONE MANHOLE | | | IN OLIVE. EOR NEEDS TO VERIFY IF THIS IS ACCURATE AND | | | UPDATE PLANS AS NEEDED. | | | | | | -EXISTING METERED WATER SERVICES TO 301 CLEMATIS ST. | | | BUILDING ARE NOT SHOWN AND LABELED ON WATER PLAN WITH | | | WHAT IS HAPPENING TO THEM. UPDATE AT FORMAL ENGINEERING | | | SUBMITTAL. | | | | | | -PLANS ARE MISSING SEVERAL STANDARD DETAILS INCLUDING | | | SMALL METERED WATER SERVICE, LARGE METERED WATER | | | SERVICE, AND FIRELINE BACKFLOW ASSEMBLY. ADD AT FORMAL | | | ENGINEERING SUBMITTAL. | | | | | | -PLANS FOR EXISTING OVERHEAD UTILITIES AND UTILITY | | | POLES ALONG THE ALLEYWAY WERE PREVIOUSLY UNCERTAIN. | | | NEWEST REVISION PLANS STILL DO NOT SEEM TO ACCOUNT FOR | | | THEM, OR DETAIL WHAT IS HAPPENING TO THEM. | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
3 |
Status |
F |
Date |
12-02-2021 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
12-02-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
12-02-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-12-02 10:49:32 | COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR, ENG. | | | SERVICES DEPT., 561-494-1098 [email protected] : | | | | | | SHEET 6.1 & SHEET 6.2 ? LOOKS LIKE THESE SHEETS ARE | | | INTENDED TO CONTAIN STANDARD DETAILS, BUT IT APPEARS | | | LIKE THEY?RE FORMATTED WRONG. THE FILE NAME SHOWS CAD | | | AND ALSO JPEG. PLEASE CORRECT. | | | | | | COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE | | | SUPER., WPB PUBLIC UTILITIES, 561-494-2262 OR | | | [email protected]: | | | FOLLOWUP COMMENTS: | | | | | | SHOW AND LABEL PROPOSED METERED IRRIGATION WATER | | | SERVICE AND BACKFLOW ASSEMBLY. | | | RESPONSE: WE PLAN TO USE THE IRRIGATION METER THAT | | | CURRENTLY EXISTS ON THE NORTH SIDE OF THE ALLEY AT THE | | | 300 BANYAN PROPERTY, BUT WILL CONFIRM PRIOR TO | | | SUBMITTAL OF FORMAL ENGINEERING PERMITS. | | | FOLLOWUP: METER BOX AND BACKFLOW ASSEMBLY NOT SHOWN | | | CLEARLY ON PLANS, BUT MAY CONFLICT WITH THE LOADING | | | ZONE. THEY CANNOT BE LOCATED IN VEHICULAR TRAFFIC. | | | | | | CIVIL PLANS DO NOT SHOW 301 CLEMATIS ST. PLEASE ADD | | | SEPARATE SHEET SHOWING WATER AND SEWER UTILITY FOR THAT | | | PROPERTY AND ADD WATER DEMAND CALCULATIONS. ALSO SHOW | | | WATER AND SEWER SERVICES. | | | RESPONSE: NO SITE CIVIL WORK IS BEING DONE FOR 301 | | | CLEMATIS. ADDING THIS TO THE PLAN SHEET WILL REQUIRE | | | REDUCING THE DRAWING SCALE SIGNIFICANTLY. WE HAVE | | | ELECTED TO SHOW THE 301 CLEMATIS PROPERTY ON A SEPARATE | | | SHEET. | | | NEW RESPONSE: BASED ON OWNER?S NEW PLANS, THE EXISTING | | | 2? WATER SERVICE AND BACKFLOW FROM OLIVE AVENUE TO 301 | | | CLEMATIS WILL BE ABANDONED, AND A NEW 3? | | | SERVICE/BACKFLOW WILL BE BROUGHT IN FROM THE 4? WATER | | | MAIN IN THE ALLEY. PLANS HAVE BEEN ADDED TO SHOW THE | | | 301 CLEMATIS BUILDING, SHOWING FIRE LINE ACCESS, WATER | | | SERVICES, AND SEWER LINE CONNECTIONS. THIS DESIGN WILL | | | BE FURTHER REFINED PRIOR TO FINAL PERMIT SUBMITTAL FOR | | | ENGINEERING PERMITS. | | | FOLLOWUP: SEPARATE SHEET FOR 301 CLEMATIS IS MISSING. | | | PLEASE INCLUDE ON NEXT RESUBMITTAL. DESIGN OF PROPOSED | | | WATER SERVICE FOR 301 CLEMATIS LOOKS PROBLEMATIC FOR | | | SEVERAL REASONS. 3 INCH METER WOULD NOT BE ABLE TO BE | | | PLACED AT SOUTH SIDE OF ALLEY ROW DUE TO VEHICLE | | | TRAFFIC. THE OTHER SUBSTANTIAL ISSUES ARE THAT THE | | | WATER SERVICE SHOULD NOT BE ROUTED THROUGH ANOTHER | | | PRIVATE WATER SERVICE AND NOT SEEING ACCEPTABLE | | | LOCATION FOR THE BACKFLOW ASSEMBLY. LESSER ISSUES ARE | | | THAT PIPING IS SLEEVED, ADDITIONAL VALVING WOULD BE | | | NEEDED, AND PIPE SIZING APPEARS INADEQUATE. | | | | | | NEW COMMENTS: | | | | | | -THERE APPEARS TO BE A BIKE RACK ON THE EAST SIDE OF | | | THE DOMESTIC BACKFLOW ASSEMBLIES. THERE MAY NOT BE | | | ENOUGH SPACE TO USE BIKE RACK SINCE THE BACKFLOWS AND | | | METER ARE ABOVE-GROUND. | | | | | | -ON SIGNING PLAN PLEASE SHOW ANY SIGNS AT THE EAST SIDE | | | OF THE ALLEY. THERE SHOULD BE SIGNS PREVENTING TRAFFIC | | | INTO THE ALLEY AND ALSO SIGNS NOTIFYING OLIVE IS ONE | | | WAY. | | | | | | -PLEASE ADJUST LOCATION OF ABOVE-GROUND METER SO THAT | | | BYPASS BLOWOFF BOX WILL NOT BE RAN OVER BY VEHICLES IN | | | ALLEY. | | | | | | -AUTOTURN EXHIBIT MAKES IT LOOK LIKE LARGE TRUCKS WILL | | | HIT OBJECTS AND STRUCTURES IN ALLEY. PLEASE VERIFY | | | LARGE VEHICLES WILL HAVE SUFFICIENT CLEARANCE. | | | | | | -PLANS DID NOT SHOW KNEE WALL ANYMORE AT SOUTH EAST | | | OUTSIDE DINING AREA. A-1 SHEET MAKES TABLES LOOK CLOSE | | | TO ALLEY TRAFFIC WITHOUT ANY OBJECTS IN BETWEEN FOR | | | PROTECTION. IS THAT AS INTENDED? | | | | | | -ON GRADING PLAN PLEASE CHECK DRAINAGE AT THE 12.05 | | | ELEVATION IN ALLEY. WILL WATER FLOW INTO DINING AREA | | | AND REMAIN THERE? | | | | | | -SHEETS 6.1 AND 6.2 OF CIVIL PLAN SET ARE NOT READABLE | | | OR SHOWING CORRECTLY. | | | | | | -EXPLAIN WHAT IS HAPPENING TO THE EXISTING WATER | | | SERVICE AND METER BOX ON THE NORTH SIDE OF THE PROPERTY | | | ADJACENT BANYAN. IF IT WILL REMAIN, SHOW LOCATION ON | | | PLANS. | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
F |
Date |
10-14-2021 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
10-14-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
10-14-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-10-14 07:36:19 | COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR, | | | ENGINEERING SERVICES DEPT., 561-494-1098 | | | [email protected] : | | | | | | 1. CONFIRM THAT A COMPLETED LOS ANALYSIS SUMMARY TABLE | | | HAS BEEN SUBMITTED DIRECTLY TO ENGINEERING (SHEET 33 OF | | | CITY OF WPB DEVELOPMENT APPLICATION). | | | 2. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY | | | SEWER ARE REQUIRED. | | | 3. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND | | | PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM | | | AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE | | | PER FAC 64E-8 FOR WATER AND PER FAC 64-E.008 FOR SEWER. | | | 4. PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND | | | STORMWATER PIPES ALONG ENTIRE PROJECT FRONTAGE. | | | 5. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND | | | IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED | | | AREAS. | | | 6. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE | | | SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING | | | PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT | | | HIM AT 561-494-2262 OR [email protected] | | | 7. FOR FORMAL ENGINEERING SUBMITTAL , PLANS SHALL SHOW | | | PROPOSED LOCATIONS AND DIMENSIONS OF ALL WATER, | | | STORMWATER, AND SANITARY AND SEWER LINES, INCLUDING | | | STUBS TO EACH PROPERTY LINE FOR WATER AND SANITARY | | | SEWERS, THE MAKE AND MODEL OF ALL VALVES, METERS, AND | | | OTHERS DEVICES TO BE INSTALLED ON THE SYSTEM, CATCH | | | BASINS, CULVERTS, DITCHES INCLUDING GRADES, PIPES | | | SIZES, MATERIALS, ELEVATIONS, ASSUMPTIONS, | | | CALCULATIONS, INVERT ELEVATIONS FOR ALL INLETS AND | | | MANHOLES AND PROFILES OF SANITARY SEWER LINES. ALL | | | AVAILABLE ELEVATION SHALL BE SHOWN ON THE PROFILE VIEW. | | | DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN | | | VIEW FOR ALL SANITARY AND STORM SEWERS. ADDITIONALLY, | | | PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED | | | UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC, | | | ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION | | | FACILITIES LOCATED ON THE RIGHT-OF-WAY. | | | 8. FOR FORMAL ENGINEERING SUBMITTAL , CUT AND CAP | | | UTILITIES NOT IN USE, AND REMOVE ANY ABANDONED UTILITY | | | LINES LARGER THAN 2 INCHES FROM CITY RIGHT OF WAY. | | | 9. FOR FORMAL ENGINEERING SUBMITTAL , PROVIDE DEDICATED | | | UTILITY EASEMENTS TO ALLOW ACCESS FOR CITY PERSONNEL TO | | | PROPOSED UTILITY WATER METERS. | | | 10. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER | | | METER AND BACKFLOW PREVENTION. | | | 11. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE CALLOUT | | | DOMESTIC BACKFLOW PREVENTER AS RPPA AND FIRE BACKFLOW | | | PREVENTER AS DCDA. SPECIFY LEAD FREE DESIGN ON ALL | | | BACKFLOWS. | | | 12. FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND | | | NPDES NOI REQUIREMENTS WILL BE ENFORCED. | | | - AN NOI IS REQUIRED FOR PROJECTS THAT: | | | - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS | | | THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF | | | DEVELOPMENT OR SALE; AND | | | - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE | | | STATE OR TO SURFACE WATERS OF THE STATE THROUGH A | | | MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4). | | | - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF | | | CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION | | | THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL | | | SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT | | | OF THE 10-2 CERTIFICATION. IF THE ENGINEERING PLANS DO | | | NOT INCLUDE AN EROSION CONTROL PLAN, THEN THE | | | CONTRACTOR SHOULD SUBMIT ONE PRIOR TO RECEIVING THE | | | ENGINEERING PERMIT. | | | 13. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES | | | OF PROPOSED AND EXISTING WATER AND SEWER WITHIN RIGHT | | | OF WAY AND SHOW ANY CROSSINGS/CONFLICTS. | | | 14. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING | | | APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT | | | SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING | | | SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED | | | LEAD-FREE DESIGN. | | | 15. FOR FORMAL ENGINEERING SUBMITTAL CLEARLY SHOW ROAD | | | RIGHT OF WAY. | | | 16. FOR FORMAL ENGINEERING SUBMITTAL PROVIDE SANITARY | | | ELEVATIONS AT MANHOLE TIE-IN. | | | 17. FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY LINES | | | ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY | | | LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT | | | PARCELS. | | | 18. FOR FORMAL ENGINEERING SUBMITTAL, IF WATER LINES | | | ARE BEING REPLACED IN ROW, SHOW ADJACENT PARCEL | | | ADDRESSES. | | | 19. FOR FORMAL ENGINEERING SUBMITTAL, WHEN TRENCHING IN | | | IN CITY MAINTAINED ROADWAY AREAS ADD NOTE TO PROVIDE 50 | | | FT. PAVEMENT RESTORATION TRANSITION ON EACH SIDE OF | | | PROPOSED TRENCH PER CURRENT CITY OF WPB STANDARD DETAIL | | | GC-8. | | | 20. PLEASE RESPOND TO ALL COMMENTS IN WRITING AND | | | INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER | | | (Z-XXXXXXXX). | | | | | | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD | | | CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES, | | | PLEASE CONTACT 561-494-2262 OR [email protected]: | | | | | | FOLLOWUP COMMENTS: | | | | | | -RESPONSES DO NOT SEEM TO MATCH CIVIL PLANS. NOT SURE | | | IF OLD PLAN WAS SUBMITTED OR RESPONSES ARE INACCURATE. | | | PLEASE UPDATE BOTH AS NEEDED AND RESUBMIT. WILL LIST | | | THE PROBLEMATIC ONES BELOW: | | | | | | WATER SERVICE STANDARD DETAILS ON CIVIL PLANS ARE OLD | | | REVISION. PLEASE USE NEWEST REVISION. | | | RESPONSE: NEWEST DETAILS HAVE BEEN INCORPORATED INTO | | | THIS RESUBMITTAL. | | | | | | WATER METERS OF SIZE THREE INCHES OR LARGER NEED TO BE | | | INSTALLED ABOVE-GROUND REFERENCING THE ABOVE-GROUND | | | METER STANDARD DETAIL. | | | RESPONSE: NOTED. PROJECT WILL USE A THREE-INCH DOMESTIC | | | METER. | | | | | | ADJUST METER MAINTENANCE BYPASS SO IT IS ON THE SOUTH | | | SIDE OF THE METER INSTEAD OF THE NORTH SIDE. | | | RESPONSE: METER BYPASS ORIENTATION HAS BEEN ADJUSTED | | | ACCORDINGLY. | | | | | | FOR A THREE-INCH METER THE WATER SERVICE SHOULD BE | | | FOUR-INCH DIP. IF NEED SIX-INCH DIP WATER SERVICE, THEN | | | ADJUST METER TO SIX-INCH SIZE. | | | RESPONSE: WE ARE ASSUMING A 4? DOMESTIC WATER SERVICE | | | LINE WHICH WILL USE A 3? METER. | | | | | | RELOCATE METER ASSEMBLY FOUR FEET EAST. | | | RESPONSE: METER ASSEMBLY HAS BEEN RELOCATED. REFER TO | | | SHEET C 4.1. | | | | | | SHOW AND LABEL PROPOSED CLEANOUTS ON THE SEWER PLAN. | | | RESPONSE: CLEANOUTS ARE SHOWN ON THE SEWER PLAN. | | | | | | SHOW AND LABEL TAPPING VALVES AT WATER MAIN FOR FIRE | | | AND WATER SERVICES. | | | RESPONSE: TAPPING VALVES ADDED FOR THE FIRE AND | | | DOMESTIC WATER SERVICES. | | | | | | CONSIDER DUAL/PARALLEL DOMESTIC BACKFLOW ASSEMBLIES TO | | | MINIMIZE WATER OUTAGE DURING BACKFLOW MAINTENANCE. | | | RESPONSE: NOTED. PARALLEL DOMESTIC BACKFLOWS WILL BE | | | SPECIFIED. | | | | | | CIVIL PLANS DO NOT SHOW 301 CLEMATIS ST. PLEASE ADD | | | SEPARATE SHEET SHOWING WATER AND SEWER UTILITY FOR THAT | | | PROPERTY AND ADD WATER DEMAND CALCULATIONS. ALSO SHOW | | | WATER AND SEWER SERVICES. | | | RESPONSE: NO SITE CIVIL WORK IS BEING DONE FOR 301 | | | CLEMATIS. ADDING THIS TO THE PLAN SHEET WILL REQUIRE | | | REDUCING THE DRAWING SCALE SIGNIFICANTLY. WE HAVE | | | ELECTED TO SHOW THE 301 CLEMATIS PROPERTY ON A SEPARATE | | | SHEET. | | | | | | CIVIL PLANS DO NOT SHOW PAVEMENT RESTORATION FOR OLIVE | | | AVE. PLEASE SHOW AND LABEL THOSE BOUNDARIES AND ADD | | | APPROPRIATE STANDARD DETAIL. | | | RESPONSE: PAVEMENT RESTORATION ON OLIVE AVENUE HAS BEEN | | | ADDED TO THE PLANS. | | | | | | | | | NEW COMMENTS: | | | | | | -SITE PLAN SHOWS DOOR FROM SOUTHERN BUILDING OPENING | | | INTO ALLEY ROW. | | | | | | -PROPOSED DOMESTIC BACKFLOW ASSEMBLY SHOULD NOT BE IN | | | UTILITY EASEMENT. | | | | | | -IS A GAS LINE RUNNING THROUGH A GREASE TRAP? | | | | | | -COMMUNICATION UTILITY CONFLICT WITH PROPOSED MH1. HOW | | | WILL IT BE RESOLVED? | | | | | | -WILL DOOR HIT FDC AT NW CORNER? | | | | | | -WILL DOOR HIT DOMESTIC BACKFLOW ASSEMBLY? | | | | | | -SHOW AND LABEL PROPOSED METERED IRRIGATION WATER | | | SERVICE AND BACKFLOW ASSEMBLY. | | | | | | -TWO SECTIONS OF 2 FOOT CONCRETE KNEE WALL IS PROPOSED | | | DIRECTLY ABOVE DOMESTIC WATER SERVICE. THAT IS A | | | MAINTENANCE CONFLICT FOR THE WATER SERVICE. | | | | | | -ADD ABOVE GROUND TO LABEL OF DOMESTIC WATER METER. | | | REFERENCE THE CORRECT STANDARD DETAIL AND ADD STANDARD | | | DETAIL TO CIVIL PLAN SET. | | | | | | -RECOMMEND DRAIN FOR ROOM WITH DCDA IN CASE IT FLOODS. | | | | | | -LABEL GATE VALVE FOR FIRELINE AT WATERMAIN POINT OF | | | SERVICE. | | | | | | -AT FORMAL ENGINEERING SUBMITTAL, ADD FIRE FLOW | | | CALCULATIONS TO WATER PLAN. | | | | | | -THERE ARE AT LEAST THREE ACTIVE METERED WATER SERVICES | | | AT ALLEY NEAR NORTHWEST CORNER OF 301 CLEMATIS. UPDATE | | | DEMO AND WATER PLANS TO SHOW MORE CLEARLY WHAT IS | | | HAPPENING TO THEM. ALSO SHOW THE ASSOCIATED BACKFLOW | | | ASSEMBLIES. THE NORTHERN METER IS IRRIGATION AND MAY | | | CONFLICT WITH PROPOSED GREASE TRAPS. THE SOUTHERN TWO | | | ARE FOR 107 N OLIVE AVE AND 109 N OLIVE. | | | | | | -THE CONCRETE UTILITY POLES IN ALLEY NEAR LOADING ZONES | | | MAY CONFLICT WITH LOADING ZONE TRAFFIC. THEY ARE ALSO | | | NOT SHOWED ON LANDSCAPE PLAN. PLEASE CLEARLY LABEL | | | THOSE ON ALL PLAN SETS WITH WHAT IS HAPPENING TO THEM. | | | THEY SEEM TO HAVE WIRES RUNNING FROM THEM ACROSS THE | | | ALLEY TO 301 CLEMATIS. | | | | | | -DEMO PLAN SAYS WOOD POLES ARE BEING REMOVED IN ALLEY. | | | VERIFY IF THERE ARE OVERHEAD UTILITIES AND CONDUITS | | | RUNNING FROM THEM. IF SO, SHOW AND LABEL WHAT IS | | | HAPPENING TO THE OVERHEAD UTILITIES AND CONDUITS ON THE | | | CIVIL PLANS. | | | | | | | | | COMMENTS PER MIKE TECHNOW 561-494-1047 OR | | | [email protected] WITH ANY QUESTIONS OR CONCERNS. | | | | | | -PLEASE PROVIDE UTILITY CROSSING PROFILE AND UTILITY | | | CROSSING INFORMATION. | | | -THE FLOW APPEARS TO BE ENTERING THE GREASE TRAP? WHERE | | | IS THIS COMING FROM? | | | - CALL OUT HORIZONTAL SEPARATION OF EXISTING UTILITIES. | | | -CALL OUT POINT OF SERVICE FOR 6? DIP PRIVATE WATER | | | LINE. | | | -SHOW DRY UTILITIES ON N OLIVE AVE. | | | -THE CALL OUT SHOULD READ ?TAPPING TEE? ON PROP. 8? | | | FIRE LINE OFF OF N OLIVE. | | | -SHOW EXISTING VALVES AND MANHOLES WITHIN MILLING AND | | | RESURFACING LIMITS. (ON THE SOUTH END OF N OLIVE). | | | -ADD NOTE CALLING OUT STORM INLET AT SE CORNER. | | | -NEED A VALVE AFTER THE TAP ON THE PROP. 6? FIRE LINE. | | | -ADD ADDITIONAL VALVE IN METER ASSEMBLY PER CITY | | | DETAIL. | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
08-05-2021 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
08-05-2021 |
Time |
|
Rev Time |
|
| Received By |
rrossano |
Date |
08-05-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-08-05 13:05:06 | COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR, | | | ENGINEERING SERVICES DEPT., 561-494-1098 | | | [email protected] : | | | | | | 1. THE CITY OF WEST PALM BEACH HAS A NUMBER OF | | | REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY | | | AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND | | | WASTEWATER UTILITIES WITHIN THE CITY. TO VIEW | | | DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AND OTHER | | | ENGINEERING RELATED DOCUMENTS, CLICK HERE OR GO TO: HTT | | | PS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING-FOR | | | MS-PERMITS-AND-APPLICATIONS . | | | 2. CODE OF ORDINANCES, CITY OF WEST PALM BEACH, | | | FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, ADOPTED | | | SEPT. 22, 2008. (SUPPLEMENT NO. 18) CHAPTER 90 | | | UTILITIES, ARTICLE I. SEC. 90-7. | | | POLICY REGARDING EXTENSION OF WATER OR SEWER SERVICE | | | FACILITIES OF THE CITY: | | | THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE | | | CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY | | | BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS, | | | BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION. | | | 3. AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH | | | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, | | | STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR | | | MORE INFORMATION, CLICK HERE OR GO TO: HTTPS://WWW.WPB. | | | ORG/GOVERNMENT/ENGINEERING/ENGINEERING-FORMS-PERMITS-AN | | | D-APPLICATIONS . | | | 4. PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY | | | OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC | | | RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF | | | YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE | | | MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL | | | IN THE WPB ENGINEERING SERVICES DEPARTMENT AT | | | [email protected] OR 561-494-1040 FOR FURTHER | | | ASSISTANCE. | | | 5. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS | | | OF ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES, | | | INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND | | | SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES, | | | METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE | | | SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING | | | GRADES, PIPES SIZES, MATERIALS, ELEVATIONS, | | | ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL | | | INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER | | | LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE | | | PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN | | | VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. | | | PLEASE SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT | | | MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL | | | EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT, | | | INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION & | | | TELECOMMUNICATION FACILITIES LOCATED ON THE | | | RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL | | | UTILITY CROSSINGS. | | | 6. CUT AND CAP UTILITIES NOT IN USE, AND REMOVE ANY | | | ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY | | | ROW. | | | 7. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE | | | DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB | | | DEVELOPMENT APPLICATION). | | | 8. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND | | | PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM | | | AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE | | | PER FAC 64E-8 FOR WATER AND PER FAC 64-E.008 FOR SEWER. | | | 9. SHOW VERTICAL DATUM AND DATUM CONVERSION INFORMATION | | | (NAVD 88 AND NGVD 29). | | | 10. PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND | | | STORMWATER ALONG ENTIRE PROJECT FRONTAGE. | | | 11. PLEASE ADD NOTE TO PLANS SPECIFYING CITY?S | | | DOWNSTREAM LIFT STATION NUMBER. | | | 12. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND | | | IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED | | | AREAS. | | | 13. PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR | | | PROPOSED SANITARY LATERALS. | | | 14. PLEASE LABEL WATER LINES AS PRIVATE WHERE | | | APPLICABLE. | | | 15. PLEASE PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED | | | LOCATION OF WATER METER AND BACKFLOW PREVENTION. | | | 16. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE | | | SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING | | | PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT | | | HIM AT 561-494-2262 OR [email protected] | | | 17. PROVIDE DEDICATED UTILITY EASEMENTS TO ALLOW ACCESS | | | FOR CITY PERSONNEL TO PROPOSED UTILITY WATER METERS. | | | | | | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD | | | CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES, | | | PLEASE CONTACT 561-494-2262 OR [email protected]: | | | | | | -PROPOSED DOMESTIC BACKFLOW ASSEMBLY APPEARS TO | | | CONFLICT WITH BUSHES/TREES SHOWN ON LANDSCAPING AND | | | ARCHITECTURAL PLANS. NEED AT LEAST 18? CLEARANCE AROUND | | | BACKFLOW ASSEMBLY FOR MAINTENANCE. | | | | | | -WATER SERVICE STANDARD DETAILS ON CIVIL PLANS ARE OLD | | | REVISION. PLEASE USE NEWEST REVISION. | | | | | | -WATER METERS OF SIZE THREE INCHES OR LARGER NEED TO BE | | | INSTALLED ABOVE-GROUND REFERENCING THE ABOVE-GROUND | | | METER STANDARD DETAIL. | | | | | | -LANDSCAPING PLAN SHOWS PLANTS WHERE GREASE TRAPS ARE | | | LOCATED ON CIVIL PLANS. | | | | | | -LANDSCAPING PLANS SHOW SOME RECTANGULAR OBJECTS TO THE | | | EAST OF WATER METER, BUT THEY ARE NOT SHOWN ON THE | | | OTHER PLANS. SIMILAR OBJECTS ARE NEAR THE NORTHEAST | | | CORNER. PLEASE MAKE SURE ALL SET OF PLANS SHOW THEM | | | ACCURATELY. THOSE OBJECTS ALSO LOOK TO CONFLICT WITH | | | WATER SERVICE PIPE MAINTENANCE. | | | | | | -ADJUST METER MAINTENANCE BYPASS SO IT IS ON THE SOUTH | | | SIDE OF THE METER INSTEAD OF THE NORTH SIDE. | | | | | | -FOR A THREE INCH METER THE WATER SERVICE SHOULD BE | | | FOUR INCH DIP. IF NEED SIX IN DIP WATER SERVICE, THEN | | | ADJUST METER TO SIX INCH SIZE. | | | | | | -RELOCATE METER ASSEMBLY FOUR FEET EAST. | | | | | | -ARE THE THREE GREASE TRAPS FOR THE 301 CLEMATIS | | | BUILDING OR 300 BANYAN. IF THEY ARE FOR 301 CLEMATIS, | | | WILL EXISTING RESTAURANT, FUTURE KITCHEN, AND FUTURE | | | FOOD SERVICE BE DIRECTED TO THEM? | | | | | | -SHOW AND LABEL PROPOSED CLEANOUTS ON THE SEWER PLAN. | | | | | | -CALLOUT DISTANCE BETWEEN DOMESTIC WATER SERVICE PIPE | | | AND NEARBY MANHOLE ON WATER PLAN. | | | | | | -SHOW AND LABEL TAPPING VALVES AT WATER MAIN FOR FIRE | | | AND WATER SERVICES. | | | | | | -CONSIDER DUAL/PARALLEL DOMESTIC BACKFLOW ASSEMBLIES TO | | | MINIMIZE WATER OUTAGE DURING BACKFLOW MAINTENANCE. | | | | | | -ADD WATER DEMAND CALCULATIONS TO WATER PLAN. | | | | | | -CANNOT FIND DEMOLITION PLAN. PLEASE ADD THAT SHEET IF | | | WILL BE DEMOLITION. | | | | | | -CIVIL PLANS DO NOT SHOW 301 CLEMATIS ST. PLEASE ADD | | | SEPARATE SHEET SHOWING WATER AND SEWER UTILITY FOR THAT | | | PROPERTY AND ADD WATER DEMAND CALCULATIONS. ALSO SHOW | | | WATER AND SEWER SERVICES. | | | | | | -THERE IS A UTILITY BILLING ACCOUNT FOR A FOUR INCH | | | FIRELINE AT 301 CLEMATIS ST., BUT NOT SEE RECORD OF A | | | DCDA. MAKE SURE BUILDING DESIGN PLANS LEAVE SPACE/ROOM | | | FOR A FUTURE DCDA INSTALL. ALSO INDICATE IF THE FIRE | | | SYSTEM HAS BEEN ALTERED WITHIN THE LAST SEVEN YEARS. | | | | | | -PROPOSED CANOPIES AND OTHER BUILDING STRUCTURES FOR | | | 301 CLEMATIS APPEAR TO ENCROACH INTO THE RIGHT OF WAY | | | PAST THE PROPERTY LINES. | | | | | | -PROPOSED DOOR NEAR NORTHWEST AREA OF 301 CLEMATIS | | | BUILDING PARTIALLY ENCROACHES INTO ALLEY RIGHT OF WAY. | | | | | | -WILL A SEPARATE METERED IRRIGATION WATER SERVICE BE | | | NEEDED FOR 300 BANYAN? | | | | | | -CIVIL PLANS DO NOT SHOW PAVEMENT RESTORATION FOR OLIVE | | | AVE. PLEASE SHOW AND LABEL THOSE BOUNDARIES AND ADD | | | APPROPRIATE STANDARD DETAIL. | | | | | | -CURRENTLY PEDESTRIAN IN WHEELCHAIR CAN TRAVEL WEST | | | SIDE OF OLIVE FROM CLEMATIS TO BANYAN ON THE SIDEWALK. | | | WOULD THEY STILL BE ABLE TO DO THAT UPON PROJECT | | | COMPLETION? | | | | | | -SHOW AND LABEL ALL EXISTING WATER SERVICES. ADD WHAT | | | IS HAPPENING TO THEM ON THE LABELS. | | | | | | -DOOR CONFLICTS WITH FIRELINE BACKFLOW ASSEMBLY. | | | | | | -HAVE THE PLANS INCORPORATED ANY CHANGES FROM THE | | | BANYAN STREETSCAPE PROJECT? | | | | | | -WHAT IS THE ELEVATION OF CEILING OF THE TERRACE WHERE | | | THE FIRELINE WATER SERVICE PIPE IS RUNNING? | | | | | | -PROPERTY OWNER WILL BE REQUIRED TO SUBMIT BACKFLOW | | | COVENANT. | | | | | | | | | COMMENTS PER MIKE TECHNOW 561-494-1047 OR | | | [email protected] WITH ANY QUESTIONS OR CONCERNS. | | | | | | ADDITIONAL COMMENTS TO THE STANDARDS: | | | -PLEASE SHOW EXISTING VALVES. | | | -PLEASE SHOW EXISTING DRY UTILITIES. | | | -SHOW EXISTING UTILITIES ON OLIVE. | | | -PROVIDE CALCULATIONS FOR SELECTED METER SIZE | | | -CALL OUT POINT OF SERVICE | | | -CALL OUT EASEMENTS POINT OF SERVICE CONNECTIONS. | | | -PROVIDE PROFILE OF EXISTING UTILITIES (WATER, SEWER, | | | STORM) WITHIN CITY R/W. | | | -PROVIDE PROFILE FOR POINT OF SERVICE. | | | -INCLUDE UTILITY CONFLICT/CROSSING INFO INCLUDING SOFT | | | DIG/TEST HOLE REPORTS | | | -ADD NOTE ON PLANS THAT THIS IS WITHIN THE LIFT STATION | | | #40 SERVICE BOUNDARY. | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
10-06-2021 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
10-06-2021 |
Time |
15:05 |
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
10-06-2021 |
Time |
15:05 |
Sent To |
|
|
| Notes |
| 2021-10-06 15:13:49 | FIRE HAS NO OBJECTIONS TO THE PROPOSED AND APPROVES. | | | | | | FIRE'S APPROVAL OF THIS SUBMITTED PROJECT DOES NOT | | | CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | FIRE SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT THE | | | APPROPRIATE TIME AND IN ACCORDANCE WITH THE | | | REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
08-06-2021 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
08-06-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
08-06-2021 |
Time |
10:03 |
Sent To |
|
|
| Notes |
| 2021-08-06 10:18:07 | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, | | | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM | | | BEACH FIRE RESCUE. | | | | | | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE | | | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. | | | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS | | | ARE SUBMITTED FOR PERMIT. | | | | | | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE | | | PROPOSED PROJECT; HOWEVER, THE FOLLOWING COMMENTS ARE | | | PROVIDED AND MAY NEED FURTHER CLARIFICATIONS WHERE | | | APPLICABLE. | | | | | | 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY | | | WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE | | | PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A | | | PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED | | | TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN | | | STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY | | | MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER | | | PROTECTION. | | | | | | 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY | | | IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING | | | ALL CONSTRUCTION ACTIVITIES. | | | | | | 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM | | | ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION. | | | ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND | | | AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT | | | WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS. | | | | | | 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE | | | REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE | | | ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS. | | | | | | 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH | | | THE 7TH EDITION OF THE FLORIDA FIRE PREVENTION CODE, | | | INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES. | | | | | | 6. ALL PARKING STRUCTURES SHALL COMPLY WITH NFPA 88A, | | | PARKING STRUCTURES AND NFPA 101, THE LIFE SAFETY CODE, | | | INCLUDING MORE SPECIFICALLY, CHAPTER 42 STORAGE | | | OCCUPANCIES (PARKING STRUCTURES) | | | | | | 7. A NFPA 13 COMPLAINT FIRE SPRINKLER SYSTEM AND NFPA | | | 14 COMPLIANT WET STANDPIPE SYSTEM ARE REQUIRED FOR THIS | | | STRUCTURE. TEMPORARY STANDPIPES ARE REQUIRED WHEN THE | | | BUILDING REACHES THREE LEVELS OR THIRTY FEET WHILE | | | BEING CONSTRUCTED. SEPARATE SHOP DRAWINGS, ARE REQUIRED | | | TO BE SUBMITTED, REVIEWED AND APPROVED BY THE FIRE | | | PREVENTION BUREAU PRIOR TO ANY INSTALLATION. | | | IT IS RECOMMENDED FOR HIGH RISES HAVE TWO SEPARATE FDC | | | LOCATIONS REMOTELY LOCATED. COORDINATE THE LOCATIONS | | | WITH THE OFFICE OF THE FIRE MARSHAL. A FDC MAY BE | | | LOCATED AT THE WEST END OF THE BUILDING ON BANYAN. BOTH | | | FDC'S MAY BE WLAA MOUNTED TO AVOID PLACEMENT ON THE | | | SIDEWALKS OR LANDSCAPE AREAS. | | | | | | 7A. PER NFPA 14 | | | | | | 6.4.5.4* FIRE DEPARTMENT CONNECTIONS SHALL BE LOCATED | | | NOT MORE THAN 100 FT (30.5 M) FROM THE NEAREST FIRE | | | HYDRANT CONNECTED TO AN APPROVED WATER SUPPLY. | | | | | | 7B. PER NFPA 1 | | | | | | 18.3 WATER SUPPLIES. | | | | | | 18.3.1* AN APPROVED WATER SUPPLY CAPABLE OF SUPPLYING | | | THE REQUIRED FIRE FLOW FOR FIRE PROTECTION SHALL BE | | | PROVIDED TO ALL PREMISES UPON WHICH FACILITIES, | | | BUILDINGS, OR PORTIONS OF BUILDINGS ARE HEREAFTER | | | CONSTRUCTED OR MOVED INTO THE JURISDICTION. THE | | | APPROVED WATER SUPPLY SHALL BE IN ACCORDANCE WITH | | | SECTION 18.4. | | | PER FLORIDA ADMINISTRATIVE CODE SECTION 61G15-32.004, | | | FIRE PROTECTION ENGINEERING DOCUMENTS SHALL INCLUDE THE | | | POINT OF SERVICE FOR THE WATER SUPPLY, A LIST OF | | | APPLICABLE NFPA STANDARDS APPLICABLE TO THE PROJECT, | | | CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR | | | AREA, SUPPRESSION SYSTEM TYPE, DESIGN DENSITIES, WATER | | | SUPPLY DATA (FIRE PUMP DATA, HYDRANT FLOW TEST DATA) | | | AND ANY PERFORMANCE BASED INFORMATION SUCH AS | | | PRE-ENGINEERED SYSTEMS. | | | FOR THE PROPOSED FIRE PUMP(S) , WHAT IS(ARE) THE | | | PRIMARY AND SECONDARY POWER SOURCES? | | | | | | 7C. THE LOCATION OF THE DDCV FIRE LINE LOCATION SHALL | | | MEET THE REQUIREMENTS OF NFPA 24 AND SHALL BE | | | COORDINATED WITH THE OFFICE OF FIRE MARSHAL, THE CITY'S | | | ENGINEERS OFFICE, THE LANDSCAPE PLANNER, AND THE CITY'S | | | PLANNING AND ZONING OFFICE. | | | | | | 8. A CLASS ?A? NFPA 72 COMPLIANT MONITORED FIRE ALARM | | | SYSTEM IS REQUIRED FOR THIS STRUCTURE. SEPARATE SHOP | | | DRAWINGS, ARE REQUIRED TO BE SUBMITTED, REVIEWED AND | | | APPROVED BY THE FIRE PREVENTION BUREAU PRIOR TO ANY | | | INSTALLATION. | | | | | | 9. ALL ELEVATORS SHALL BE EQUIPPED WITH A REGION 7 | | | KEYWAY SYSTEM. | | | ALL NEW ELEVATORS SHALL CONFORM TO THE FIRE FIGHTER?S | | | EMERGENCY OPERATIONS REQUIREMENTS OF ASME A17.1/CSA | | | B44, SAFETY CODE FOR ELEVATORS. | | | ANY BUILDING THAT IS MORE THAN THREE STORIES HIGH OR IN | | | WHICH THE VERTICAL DISTANCE BETWEEN THE BOTTOM TERMINAL | | | LANDING AND THE TOP TERMINAL LANDING EXCEEDS 25 FEET | | | MUST BE CONSTRUCTED TO CONTAIN AT LEAST ONE PASSENGER | | | ELEVATOR THAT IS OPERATIONAL AND WILL ACCOMMODATE AN | | | AMBULANCE STRETCHER 76 INCHES LONG AND 24 INCHES WIDE | | | IN THE HORIZONTAL POSITION. | | | | | | 10. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL | | | BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL | | | DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS, | | | EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A | | | PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE | | | SAFETY FEATURES AND EQUIPMENT. | | | | | | 11. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED | | | ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF | | | FIRE PREVENTION. | | | ALL NEW FIRE HYDRANTS AND FDC?S PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLOSELY COORDINATED WITH THE | | | BUREAU OF FIRE PREVENTION. | | | | | | 12. COMMAND ROOM | | | | | | THE FIRE COMMAND CENTER SHALL COMPLY WITH NFPA 1, | | | CHAPTER 11, BUILDING SERVICES; 11.9 AND SHALL CONTAIN | | | THE FOLLOWING FEATURES: | | | 11.9.1 THE LOCATION, DESIGN, CONTENT, AND FIRE | | | DEPARTMENT ACCESS OF THE EMERGENCY COMMAND CENTER SHALL | | | BE APPROVED BY THE FIRE DEPARTMENT. | | | | | | 11.9.2 THE EMERGENCY COMMAND CENTER SHALL BE SEPARATED | | | FROM THE REMAINDER OF THE BUILDING BY A FIRE BARRIER | | | HAVING A FIRE RESISTANCE RATING OF NOT LESS THAN 1 | | | HOUR. | | | | | | 11.9.3 THE EMERGENCY COMMAND CENTER ROOM SHALL BE A | | | MINIMUM OF 96 FT2 (8.9 M2) WITH A MINIMUM DIMENSION OF | | | 8 FT (2.4 M). | | | | | | A. PER FL BLDG CODE;(MORE STRICT) IT SHALL BE A MINIMUM | | | OF 200 FT SQUARED WITH A MINIMUM DIMENSION OF 10 FT. | | | B. THE FIRE DEPARTMENT COMMUNICATIONS SYSTEM. | | | C. A TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED | | | ACCESS TO THE PUBLIC TELEPHONE SYSTEM | | | D. SCHEMATIC BUILDING PLANS INDICATING THE TYPICAL | | | FLOOR PLAN AND DETAILING THE BUILDING CORE, MEANS OF | | | EGRESS, FIRE PROTECTION SYSTEMS, FIRE-FIGHTING | | | EQUIPMENT AND FIRE DEPARTMENT ACCESS AND THE LOCATION | | | OF FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE | | | BARRIERS AND SMOKE PARTITIONS | | | E. A WORK TABLE. | | | F. IF APPLICABLE, A HAZARDOUS MATERIAL MANAGEMENT PLAN | | | FOR THE BUILDING. | | | G. THE EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM | | | CONTROL UNIT. | | | H. ANNUNCIATOR UNIT VISUALLY INDICATING THE LOCATION OF | | | THE ELEVATORS AND WHETHER THEY ARE OPERATIONAL | | | I. STATUS INDICATORS AND CONTROLS FOR AIR DISTRIBUTION | | | SYSTEMS. | | | J. CONTROLS FOR UNLOCKING STAIRWAY DOORS SIMULTANEOUSLY | | | K. SPRINKLER VALVE AND WATER FLOW DETECTOR DISPLAY | | | PANELS | | | L. EMERGENCY AND STANDBY POWER STATUS INDICATORS | | | M. FIRE PUMP STATUS INDICATORS | | | N. GENERATOR SUPERVISION DEVICES AND MANUAL START AND | | | TRANSFER FEATURES. | | | O. PUBLIC ADDRESS SYSTEM, WHERE SPECIFICALLY REQUIRED | | | BY OTHER SECTIONS OF THIS CODE | | | P. CONTROLS REQUIRED FOR SMOKE CONTROL | | | Q. ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME | | | A17.1. | | | R. ELEVATOR EMERGENCY OR STANDBY POWER SELECTOR | | | SWITCH(ES), WHERE EMERGENCY OR STANDBY POWER IS | | | PROVIDED | | | | | | 11.8.6* EMERGENCY COMMAND CENTER. | | | 11.8.6.1 AN EMERGENCY COMMAND CENTER SHALL BE PROVIDED | | | IN A | | | LOCATION APPROVED BY THE FIRE DEPARTMENT. | | | 11.8.6.2 THE EMERGENCY COMMAND CENTER SHALL CONTAIN THE | | | FOLLOWING: | | | (1) VOICE FIRE ALARM SYSTEM PANELS AND CONTROLS | | | (2) FIRE DEPARTMENT TWO-WAY TELEPHONE COMMUNICATION | | | SERVICE | | | PANELS AND CONTROLS WHERE REQUIRED BY ANOTHER SECTION | | | OF THIS | | | CODE | | | (3) FIRE DETECTION AND FIRE ALARM SYSTEM ANNUNCIATION | | | PANELS | | | (4) ELEVATOR FLOOR LOCATION AND OPERATION ANNUNCIATORS | | | (5) ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME | | | A17.1/CSA B44, SAFETY CODE FOR ELEVATORS AND ESCALATORS | | | (6) ELEVATOR EMERGENCY POWER SELECTOR SWITCH(ES) WHERE | | | PROVIDED | | | IN ACCORDANCE WITH ASME A17.1/CSA B44 | | | (7) SPRINKLER VALVE AND WATERFLOW ANNUNCIATORS | | | (8) EMERGENCY GENERATOR STATUS INDICATORS | | | (9) CONTROLS FOR ANY AUTOMATIC STAIRWAY DOOR UNLOCKING | | | SYSTEM | | | (10) FIRE PUMP STATUS INDICATORS | | | (11) TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED | | | ACCESS TO THE | | | PUBLIC TELEPHONE SYSTEM | | | (12) STAIRWAY VIDEO MONITORING EQUIPMENT AS REQUIRED BY | | | 11.8.8 | | | | | | | | | 13. RADIO | | | | | | NFPA 1, CHAPTER 11, BUILDING SERVICES; 11.10 TWO-WAY | | | RADIO ENHANCEMENT SERVICES. | | | 11.10.1 IN ALL NEW AND EXISTING BUILDINGS, MINIMUM | | | RADIO SIGNAL STRENGTH FOR FIRE DEPARTMENT | | | COMMUNICATIONS SHALL BE MAINTAINED AT A LEVEL | | | DETERMINED BY THE AHJ. | | | | | | NFPA 72, 24.9 TWO-WAY RADIO COMMUNICATIONS ENHANCEMENT | | | SYSTEMS. | | | 24.9.1 GENERAL. | | | 24.9.1.1 NON-INTERFERENCE. NO AMPLIFICATION SYSTEM | | | CAPABLE | | | OF OPERATING ON FREQUENCIES OR CAUSING INTERFERENCE ON | | | FREQUENCIES | | | ASSIGNED TO THE JURISDICTION BY THE FCC SHALL BE | | | INSTALLED | | | WITHOUT PRIOR COORDINATION AND APPROVAL OF THE | | | AUTHORITY | | | HAVING JURISDICTION. THE BUILDING MANAGER/OWNER SHALL | | | SUSPEND AND CORRECT OTHER EQUIPMENT INSTALLATIONS THAT | | | DEGRADE | | | THE PERFORMANCE OF THE PUBLIC SAFETY RADIO SYSTEM OR | | | PUBLIC SAFETY RADIO ENHANCEMENT SYSTEM. | | | 24.9.1.2 APPROVAL AND PERMIT. PLANS SHALL BE SUBMITTED | | | FOR | | | APPROVAL PRIOR TO INSTALLATION. AT THE CONCLUSION OF | | | SUCCESSFUL | | | ACCEPTANCE TESTING, A RENEWABLE PERMIT SHALL BE ISSUED | | | FOR THE | | | PUBLIC SAFETY RADIO ENHANCEMENT SYSTEM WHERE REQUIRED | | | BY | | | THE AUTHORITY HAVING JURISDICTION. | | | | | | THE SYSTEM SHALL MAINTAIN A MINIMUM RADIO SIGNAL | | | STRENGTH OF -95 DBM FOR THE RADIO SYSTEM USED BY WEST | | | PALM BEACH FIRE DEPARTMENT. TESTING SHALL BE BY AN | | | ACCEPTABLE NATIONAL STANDARD DOCUMENTING PERCENTAGES | | | NOTED ABOVE AND BY ACTUAL RADIO TESTING BY FIRE | | | PERSONNEL. IF THE MINIMUM CANNOT BE MAINTAINED, A | | | BI-DIRECTIONAL AMPLIFIED SYSTEM SHALL BE INSTALLED WITH | | | A MINIMUM 2-HOUR RUN TIME BATTERY BACK-UP. | | | | | | PLEASE CONTACT MARK FILLA, PALM BEACH COUNTY PUBLIC | | | SAFETY RADIO SYSTEMS MANAGER, [email protected], | | | 561-233-0837; AS OUR RADIOS OPERATE ON THEIR SYSTEM FOR | | | DETAILED RADIO FREQUENCY AND INSTALLATION INSTRUCTIONS. | | | | | | | | | 14. KNOX-BOX KEY SYSTEM SHALL BE REQUIRED FOR THIS | | | BUILDING. | | | ANY GATES SHALL BE PROVIDED WITH KNOX KEY ACCESS LOCKS, | | | PADLOCKS AND/OR SWITCHES FOR 24 HOUR EMERGENCY ACCESS. | | | | | | 15. THE SMOKE CONTROL SYSTEM SHALL COMPLY WITH NFPA | | | 101, CHAPTER 9, BUILDING SERVICE AND FIRE PROTECTION | | | EQUIPMENT, INCLUDING: | | | THE SMOKE CONTROL SYSTEMS SHALL BE INSTALLED, | | | INSPECTED, TESTED, AND MAINTAINED IN ACCORDANCE WITH | | | NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS; NFPA 204, | | | STANDARD FOR SMOKE AND HEAT VENTING; OR NATIONALLY | | | RECOGNIZED STANDARDS, ENGINEERING GUIDES, OR | | | RECOMMENDED PRACTICES, AS APPROVED BY THE AUTHORITY | | | HAVING JURISDICTION. | | | THE ENGINEER OF RECORD SHALL CLEARLY IDENTIFY THE | | | INTENT OF THE SYSTEM, THE DESIGN METHOD USED, THE | | | APPROPRIATENESS OF THE METHOD USED, AND THE REQUIRED | | | MEANS OF INSPECTING, TESTING, AND MAINTAINING THE | | | SYSTEM. | | | ACCEPTANCE TESTING SHALL BE PERFORMED BY A SPECIAL | | | INSPECTOR IN ACCORDANCE WITH SECTION 9.9. | | | | | | 16. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT | | | DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | 17. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING | | | PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH | | | THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
5 |
Status |
P |
Date |
01-21-2022 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
01-21-2022 |
Time |
16:07 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
01-21-2022 |
Time |
16:07 |
Sent To |
|
|
| Notes |
| 2022-01-21 16:09:22 | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | STREET TREES AND RIGHT OF WAY LANDSCAPING AND | | | IRRIGATION APPROVED WITH THIS PETITION. | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A | | | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | | | | 6. PARTIALLY SATISFIED. THE PLANTING STRIPS SHALL BE | | | MODIFIED TO BE CONTINUOUS AT THE SOUTH END ON THE OLIVE | | | AVENUE DROP OFF AND THE WEST END OF THE BANYAN BLVD | | | DROP OFF. | | | | | | CORRECT SHEET L-7 TO REFLECT THE CONVERSION TO PLANTING | | | AREAS WHERE STRUCTURAL SOIL IS NOT REQUIRED. REMOVE | | | TREE GRATE DETAIL FROM SHEET L-4. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
4 |
Status |
P |
Date |
12-02-2021 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
12-02-2021 |
Time |
15:28 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
12-02-2021 |
Time |
15:28 |
Sent To |
|
|
| Notes |
| 2021-12-02 15:29:19 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 300 BANYAN Z21070018 | | | DECEMBER 2, 2021 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | | | | 1. MAKE THE FOLLOWING CORRECTIONS TO THE TREE | | | DISPOSITION PLAN: | | | ? SATISFIED. ADD A COLUMN TO THE CHART FOR MITIGATION | | | SQUARE FOOTAGE DUE AND SHOW THE AMOUNT FOR EACH TREE | | | PROPOSED TO BE REMOVED. | | | COLUMN SHOULD BE LABELED MITIGATION DUE, NOT TREE | | | CREDITS. TREES WITH A CANOPY 20 FEET OR MORE IN | | | DIAMETER MUST HAVE THE ACTUAL SQUARE FOOTAGE CALCULATED | | | AND ENTERED ON THE CHART. | | | ? SATISFIED. PROVIDE TOTAL OF MITIGATION SQUARE FOOTAGE | | | DUE. | | | UPDATE TOTAL WITH MITIGATION RECALCULATED FOR ABOVE. | | | ? CONDITIONALLY SATISFIED. PROVIDE A TOTAL OF | | | MITIGATION SQUARE FOOTAGE PROVIDED BASED ON THE PLANT | | | LIST. | | | PROVIDE A CHART WITH THE TOTAL FOR EACH SPECIES AND | | | REMOVE MITIGATION CALCULATIONS FROM SHEET L11, THEY ARE | | | INCORRECT. TREE CATEGORY LIST MUST BE USED FOR | | | MITIGATION CREDITS. CATEGORY 1 IS 300 SQ FT CANOPY | | | CREDIT, CATEGORY 2 IS 150 SQ FT CANOPY CREDIT, CATEGORY | | | 3 IS 100 SQ FT CANOPY CREDIT, CATEGORY 4 IS 50 SQ FT | | | CANOPY CREDIT. | | | | | | COUNTS DO NOT MATCH PLANT LIST. THERE ARE 13 LIVE OAKS, | | | NOT 12 (3900 SQ FT) SABAL PALMS ARE CATEGORY 3 AT 100 | | | SQ FT EACH (400 SQ FT), 7 HOLLY AT 150 EACH (1050 SQ | | | FT), 2 MEDJOOL CATEGORY 3 AT 100 EACH (200 SQ FT) | | | TOTAL WOULD BE 8000 SQ FT, LEAVING 614SQ FT TO BE | | | MITIGATED BY PAYMENT IN LIEU. | | | | | | | | | | | | 2. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE | | | TREES IN GOOD CONDITION TO BE PRESERVED ON SITE OR | | | RELOCATED. ANSI A 300 (PART 5) STANDARDS SPECIFY | | | EXAMPLES OF SUITABILITY RATINGS OF GOOD, MODERATE, OR | | | POOR FOR RELOCATION. PROVIDE AN ARBORIST REPORT SHOWING | | | CONDITION FOR ALL TREES AND RELOCATION POTENTIAL FOR | | | THE NATIVE TREES. ALL INDIVIDUAL TREES NEED AN ACCURATE | | | REASON FOR REMOVAL PROVIDED, CANNOT BE A GENERAL | | | STATEMENT, SO REMOVE THE NOTE. | | | REMOVE NOTE ON TREE DISPOSITION SCHEDULE SHEET L1A | | | REGARDING REMOVAL OF TREES AS IT IS NOT ACCURATE OR | | | RELEVANT. | | | THE ARBORIST REPORT LISTS ONLY TREE #12 AS GOOD | | | CONDITION. PROVIDE THE REASON FOR NOT RELOCATING. | | | | | | 3. SATISFIED. PROVIDE A DIAGRAM OF THE PROVIDED 25% | | | PRIVATE OPEN SPACE AREAS FOR CWD-10. IDENTIFY THE TYPE | | | OF OPEN SPACE AS ALLOWED BY TABLE IV-7 AND DEFINITIONS | | | IN SECTION 94-109. SHOW HOW THE STANDARDS FOR THE TYPES | | | OF OPEN SPACE ARE MET FOR VEGETATED AREAS AND TREE | | | CANOPY SQUARE FOOTAGE BASED ON TABLE IV-8. | | | SHOW EACH TERRACE PRIVATE OPEN SPACE SQUARE FOOTAGE AND | | | HOW IT INDIVIDUALLY MEETS THE 20% VEGETATED AREA. THEY | | | CAN SHOW THE TOTAL AREA PROVIDED, BUT EACH SPACE MUST | | | MEET THE REQUIREMENTS. PROVIDE ALL SQUARE FOOTAGE AND | | | PERCENTAGE MEASUREMENTS ON SHEET L8A. | | | | | | | | | 4. SATISFIED. PROVIDE CALCULATIONS FOR REQUIRED STREET | | | TREES AT ONE FOR EVERY 30 FEET OR PORTION THEREOF FOR | | | STREETSCAPE LENGTH, AND SHOW THE NUMBER PROVIDED PER | | | SECTION 94-113 AND 94-116. | | | STREET TREE CALCULATIONS AND PLAN NEED TO BE PROVIDED. | | | OLIVE AVE SIDE OF CLEMATIS BUILDING NEEDS TO BE | | | INCLUDED. REFERENCE THE APPROVED STREETSCAPE PLANS FOR | | | THE BANYAN STREETSCAPE PROJECT. | | | PROVIDE THE CALCULATIONS FOR EACH STREETSCAPE LENGTH | | | FOR BANYAN AND OLIVE ALONG 300 BANYAN AND DIVIDE BY 30 | | | AND ROUND UP TO SHOW THE REQUIRED NUMBER OF STREET | | | TREES FOR EACH SIDE. PROVIDE THE NUMBER OF SHADE TREES | | | FOR EACH SIDE. PALMS MAY NOT BE COUNTED TOWARD SHADE | | | TREE REQUIREMENT. THERE IS ENOUGH ROOM TO USE LIVE OAKS | | | FOR ALL REQUIRED STREET TREES. | | | | | | 5. SATISFIED. SHOW THE LOCATIONS OF THE REQUIRED | | | STRUCTURAL SOIL UNDER HARDSCAPE PER SECTION 94-113 AND | | | PROVIDE THE TYPICAL DETAIL FOR INSTALLATION. THE AREA | | | MUST BE 9 X14 FT PARALLEL TO THE CURB FOR EACH TREE | | | CONSISTING OF PLANTING AREA AND/OR STRUCTURAL SOIL. | | | SHOW THE LOCATIONS ON THE LANDSCAPE PLAN. | | | CORRECT THE LOCATIONS TO SHOW THE STRUCTURAL SOIL ONLY | | | UNDER THE ADJACENT SIDEWALK. | | | | | | 6. SATISFIED. THERE APPEAR TO BE CONFLICTS IN SEVERAL | | | LOCATIONS BETWEEN PROPOSED STREET TREES AND DRAINAGE | | | EXFILTRATION LINES ON THE LANDSCAPE PLAN. ADJUST | | | DRAINAGE LOCATIONS SO THEY DO NOT INFRINGE ON THE | | | REQUIRED PLANTING AREA OR STRUCTURAL SOIL. | | | | | | 7. SATISFIED. SHOW THE LOCATIONS OF ALL UTILITIES ON | | | THE LANDSCAPE PLAN AND RESOLVE ANY CONFLICTS. | | | | | | 8. SATISFIED. PER SECTION 94-113 TREE GRATES ARE ONLY | | | TO BE USED IF PLANTING STRIPS ARE NOT POSSIBLE. | | | PLANTING STRIP WITH PAVER PASS THROUGHS FOR PARKING | | | SPACE ACCESS ARE WARRANTED ON BANYAN. IF PARKING IS NOT | | | APPROVED ON BANYAN, PLANTING STRIPS MUST BE USED. | | | THE PLANTING AREAS NEED TO BE LENGTHENED ALONG BOTH | | | STREETS WITH PASS THROUGHS PLACED FOR PEDESTRIAN ACCESS | | | FROM THE DROP OFFS. | | | | | | | | | 9. SATISFIED. PROVIDE A COMPLETE PLANT LIST. PLANT LIST | | | NEEDS TO BE MODIFIED TO SEPARATE THE REQUIRED OPEN | | | SPACE PLANT LISTS AND THE SEPARATE BUILDINGS. | | | LIVE OAK TREE COUNT IS INCORRECT. | | | | | | 10. SATISFIED. REMOVE HIGHRISE CULTIVAR AND INDICATE | | | SPECIES LIVE OAK OR CATHEDRAL LIVE OAK. | | | | | | 11. SATISFIED. ADD A COLUMN FOR DROUGHT TOLERANCE LEVEL | | | TO THE PLANT LIST. | | | | | | 12. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L. | | | PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT | | | MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT | | | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE | | | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH | | | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH | | | FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED | | | ON THE PLANT LIST. | | | REVISE AFTER ALL CHANGES ARE COMPLETE WITH LANDSCAPE | | | PLAN. | | | | | | 13. SATISFIED. PROVIDE BUFFER REQUIREMENTS ON THE CHART | | | AND LANDSCAPE PLAN FOR THE WEST AREA OF THE LOT | | | ADJACENT TO THE PROPERTY LINE. STAFF REQUESTS ADDING | | | ANY LANDSCAPING SUCH AS HEDGING ALONG THE ALLEY | | | PROPERTY LINE TO IMPROVE THE ENVIRONMENT. | | | PROVIDE THE ENTIRE PROPERTY LINE LENGTH FOR THE WEST | | | BUFFER, DIVIDE BY 30 AND ROUND UP FOR THE REQUIRED | | | NUMBER OF BUFFER TREES. SHOW THE NUMBER PROVIDED. SABAL | | | PALMS ARE A 3:1 EQUIVALENT TO A REQUIRED TREE. | | | | | | 14. MAKE THE FOLLOWING CORRECTIONS TO THE PLANTING | | | NOTES ON SHEET L10: | | | ? SATISFIED. CORRECT TO REMOVE CYPRESS MULCH FROM THE | | | NOTE, IT IS NOT ALLOWED. | | | ? SATISFIED. ALL PLANTING AREAS SHALL BE NOTED TO BE | | | BACKFILLED WITH 50/50 MIX OR SIMILAR TO A DEPTH OF 30 | | | INCHES. | | | ? SATISFIED. INDICATE ALL PLANT MATERIAL TO BE GRADE#1 | | | OR BETTER. | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | STREET TREES AND RIGHT OF WAY LANDSCAPING AND | | | IRRIGATION APPROVED WITH THIS PETITION. | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A | | | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | 4. PRIOR TO THE ISSUANCE OF THE BUILDING PERMIT, THE | | | TREE MITIGATION LIST SHEET L1A SHALL BE CORRECTED TO | | | REFLECT 800 SQ FT CREDIT FOR THE 8 WAX MYRTLES AND THE | | | TOTAL CORRECTED TO 6400 AND 2214 SQ FT TO BE MITIGATED | | | BY PAYMENT IN LIEU. | | | | | | 5. THE PRIVATE OPEN SPACE CALCULATIONS AND AREA PLAN | | | SHALL BE CORRECTED TO SEPARATE THE OPEN SPACE OPEN TO | | | THE SKY SQUARE FOOTAGE AND THE COVERED OPEN SPACE | | | SQUARE FOOTAGE. VEGETATED AREA PERCENTAGE FOR EACH | | | SHALL BE SHOWN. | | | | | | 6. THE PLANTING STRIPS SHALL BE MODIFIED TO BE | | | CONTINUOUS AT THE SOUTH END ON THE OLIVE AVENUE DROP | | | OFF AND THE WEST END OF THE BANYAN BLVD DROP OFF. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
3 |
Status |
F |
Date |
11-15-2021 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
11-15-2021 |
Time |
13:27 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
11-15-2021 |
Time |
13:27 |
Sent To |
|
|
| Notes |
| 2021-11-15 13:27:48 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 300 BANYAN Z21070018 | | | NOVEMBER 15, 2021 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | | | | 1. MAKE THE FOLLOWING CORRECTIONS TO THE TREE | | | DISPOSITION PLAN: | | | ? SATISFIED. ADD A COLUMN TO THE CHART FOR MITIGATION | | | SQUARE FOOTAGE DUE AND SHOW THE AMOUNT FOR EACH TREE | | | PROPOSED TO BE REMOVED. | | | COLUMN SHOULD BE LABELED MITIGATION DUE, NOT TREE | | | CREDITS. TREES WITH A CANOPY 20 FEET OR MORE IN | | | DIAMETER MUST HAVE THE ACTUAL SQUARE FOOTAGE CALCULATED | | | AND ENTERED ON THE CHART. | | | ? SATISFIED. PROVIDE TOTAL OF MITIGATION SQUARE FOOTAGE | | | DUE. | | | UPDATE TOTAL WITH MITIGATION RECALCULATED FOR ABOVE. | | | ? PARTIALLY SATISFIED. PROVIDE A TOTAL OF MITIGATION | | | SQUARE FOOTAGE PROVIDED BASED ON THE PLANT LIST. | | | PROVIDE A CHART WITH THE TOTAL FOR EACH SPECIES AND | | | REMOVE MITIGATION CALCULATIONS FROM SHEET L11, THEY ARE | | | INCORRECT. TREE CATEGORY LIST MUST BE USED FOR | | | MITIGATION CREDITS. CATEGORY 1 IS 300 SQ FT CANOPY | | | CREDIT, CATEGORY 2 IS 150 SQ FT CANOPY CREDIT, CATEGORY | | | 3 IS 100 SQ FT CANOPY CREDIT, CATEGORY 4 IS 50 SQ FT | | | CANOPY CREDIT. | | | | | | COUNTS DO NOT MATCH PLANT LIST. THERE ARE 13 LIVE OAKS, | | | NOT 12 (3900 SQ FT) SABAL PALMS ARE CATEGORY 3 AT 100 | | | SQ FT EACH (400 SQ FT), 7 HOLLY AT 150 EACH (1050 SQ | | | FT), 2 MEDJOOL CATEGORY 3 AT 100 EACH (200 SQ FT) | | | TOTAL WOULD BE 8000 SQ FT, LEAVING 614SQ FT TO BE | | | MITIGATED BY PAYMENT IN LIEU. | | | | | | 2. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE | | | TREES IN GOOD CONDITION TO BE PRESERVED ON SITE OR | | | RELOCATED. ANSI A 300 (PART 5) STANDARDS SPECIFY | | | EXAMPLES OF SUITABILITY RATINGS OF GOOD, MODERATE, OR | | | POOR FOR RELOCATION. PROVIDE AN ARBORIST REPORT SHOWING | | | CONDITION FOR ALL TREES AND RELOCATION POTENTIAL FOR | | | THE NATIVE TREES. ALL INDIVIDUAL TREES NEED AN ACCURATE | | | REASON FOR REMOVAL PROVIDED, CANNOT BE A GENERAL | | | STATEMENT, SO REMOVE THE NOTE. | | | REMOVE NOTE ON TREE DISPOSITION SCHEDULE SHEET L1A | | | REGARDING REMOVAL OF TREES AS IT IS NOT ACCURATE OR | | | RELEVANT. | | | THE ARBORIST REPORT LISTS ONLY TREE #12 AS GOOD | | | CONDITION. PROVIDE THE REASON FOR NOT RELOCATING. | | | | | | 3. SATISFIED. PROVIDE A DIAGRAM OF THE PROVIDED 25% | | | PRIVATE OPEN SPACE AREAS FOR CWD-10. IDENTIFY THE TYPE | | | OF OPEN SPACE AS ALLOWED BY TABLE IV-7 AND DEFINITIONS | | | IN SECTION 94-109. SHOW HOW THE STANDARDS FOR THE TYPES | | | OF OPEN SPACE ARE MET FOR VEGETATED AREAS AND TREE | | | CANOPY SQUARE FOOTAGE BASED ON TABLE IV-8. | | | SHOW EACH TERRACE PRIVATE OPEN SPACE SQUARE FOOTAGE AND | | | HOW IT INDIVIDUALLY MEETS THE 20% VEGETATED AREA. THEY | | | CAN SHOW THE TOTAL AREA PROVIDED, BUT EACH SPACE MUST | | | MEET THE REQUIREMENTS. PROVIDE ALL SQUARE FOOTAGE AND | | | PERCENTAGE MEASUREMENTS ON SHEET L8A. | | | | | | | | | 4. SATISFIED. PROVIDE CALCULATIONS FOR REQUIRED STREET | | | TREES AT ONE FOR EVERY 30 FEET OR PORTION THEREOF FOR | | | STREETSCAPE LENGTH, AND SHOW THE NUMBER PROVIDED PER | | | SECTION 94-113 AND 94-116. | | | STREET TREE CALCULATIONS AND PLAN NEED TO BE PROVIDED. | | | OLIVE AVE SIDE OF CLEMATIS BUILDING NEEDS TO BE | | | INCLUDED. REFERENCE THE APPROVED STREETSCAPE PLANS FOR | | | THE BANYAN STREETSCAPE PROJECT. | | | PROVIDE THE CALCULATIONS FOR EACH STREETSCAPE LENGTH | | | FOR BANYAN AND OLIVE ALONG 300 BANYAN AND DIVIDE BY 30 | | | AND ROUND UP TO SHOW THE REQUIRED NUMBER OF STREET | | | TREES FOR EACH SIDE. PROVIDE THE NUMBER OF SHADE TREES | | | FOR EACH SIDE. PALMS MAY NOT BE COUNTED TOWARD SHADE | | | TREE REQUIREMENT. THERE IS ENOUGH ROOM TO USE LIVE OAKS | | | FOR ALL REQUIRED STREET TREES. | | | | | | 5. PARTIALLY SATISFIED. SHOW THE LOCATIONS OF THE | | | REQUIRED STRUCTURAL SOIL UNDER HARDSCAPE PER SECTION | | | 94-113 AND PROVIDE THE TYPICAL DETAIL FOR INSTALLATION. | | | THE AREA MUST BE 9 X14 FT PARALLEL TO THE CURB FOR EACH | | | TREE CONSISTING OF PLANTING AREA AND/OR STRUCTURAL | | | SOIL. | | | SHOW THE LOCATIONS ON THE LANDSCAPE PLAN. | | | CORRECT THE LOCATIONS TO SHOW THE STRUCTURAL SOIL ONLY | | | UNDER THE ADJACENT SIDEWALK. | | | | | | 6. SATISFIED. THERE APPEAR TO BE CONFLICTS IN SEVERAL | | | LOCATIONS BETWEEN PROPOSED STREET TREES AND DRAINAGE | | | EXFILTRATION LINES ON THE LANDSCAPE PLAN. ADJUST | | | DRAINAGE LOCATIONS SO THEY DO NOT INFRINGE ON THE | | | REQUIRED PLANTING AREA OR STRUCTURAL SOIL. | | | | | | 7. SATISFIED. SHOW THE LOCATIONS OF ALL UTILITIES ON | | | THE LANDSCAPE PLAN AND RESOLVE ANY CONFLICTS. | | | | | | 8. SATISFIED. PER SECTION 94-113 TREE GRATES ARE ONLY | | | TO BE USED IF PLANTING STRIPS ARE NOT POSSIBLE. | | | PLANTING STRIP WITH PAVER PASS THROUGHS FOR PARKING | | | SPACE ACCESS ARE WARRANTED ON BANYAN. IF PARKING IS NOT | | | APPROVED ON BANYAN, PLANTING STRIPS MUST BE USED. | | | THE PLANTING AREAS NEED TO BE LENGTHENED ALONG BOTH | | | STREETS WITH PASS THROUGHS PLACED FOR PEDESTRIAN ACCESS | | | FROM THE DROP OFFS. | | | | | | | | | 9. PARTIALLY SATISFIED. PROVIDE A COMPLETE PLANT LIST. | | | PLANT LIST NEEDS TO BE MODIFIED TO SEPARATE THE | | | REQUIRED OPEN SPACE PLANT LISTS AND THE SEPARATE | | | BUILDINGS. | | | LIVE OAK TREE COUNT IS INCORRECT. | | | | | | 10. SATISFIED. REMOVE HIGHRISE CULTIVAR AND INDICATE | | | SPECIES LIVE OAK OR CATHEDRAL LIVE OAK. | | | | | | 11. SATISFIED. ADD A COLUMN FOR DROUGHT TOLERANCE LEVEL | | | TO THE PLANT LIST. | | | | | | 12. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L. | | | PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT | | | MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT | | | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE | | | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH | | | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH | | | FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED | | | ON THE PLANT LIST. | | | REVISE AFTER ALL CHANGES ARE COMPLETE WITH LANDSCAPE | | | PLAN. | | | | | | 13. SATISFIED. PROVIDE BUFFER REQUIREMENTS ON THE CHART | | | AND LANDSCAPE PLAN FOR THE WEST AREA OF THE LOT | | | ADJACENT TO THE PROPERTY LINE. STAFF REQUESTS ADDING | | | ANY LANDSCAPING SUCH AS HEDGING ALONG THE ALLEY | | | PROPERTY LINE TO IMPROVE THE ENVIRONMENT. | | | PROVIDE THE ENTIRE PROPERTY LINE LENGTH FOR THE WEST | | | BUFFER, DIVIDE BY 30 AND ROUND UP FOR THE REQUIRED | | | NUMBER OF BUFFER TREES. SHOW THE NUMBER PROVIDED. SABAL | | | PALMS ARE A 3:1 EQUIVALENT TO A REQUIRED TREE. | | | | | | 14. MAKE THE FOLLOWING CORRECTIONS TO THE PLANTING | | | NOTES ON SHEET L10: | | | ? SATISFIED. CORRECT TO REMOVE CYPRESS MULCH FROM THE | | | NOTE, IT IS NOT ALLOWED. | | | ? SATISFIED. ALL PLANTING AREAS SHALL BE NOTED TO BE | | | BACKFILLED WITH 50/50 MIX OR SIMILAR TO A DEPTH OF 30 | | | INCHES. | | | ? SATISFIED. INDICATE ALL PLANT MATERIAL TO BE GRADE#1 | | | OR BETTER. | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | STREET TREES AND RIGHT OF WAY LANDSCAPING AND | | | IRRIGATION APPROVED WITH THIS PETITION. | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A | | | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
F |
Date |
10-15-2021 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
10-15-2021 |
Time |
15:41 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
10-15-2021 |
Time |
15:41 |
Sent To |
|
|
| Notes |
| 2021-10-15 15:41:37 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 300 BANYAN Z21070018 | | | OCTOBER 15, 2021 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | | | | 1. MAKE THE FOLLOWING CORRECTIONS TO THE TREE | | | DISPOSITION PLAN: | | | ? PARTIALLY SATISFIED. ADD A COLUMN TO THE CHART FOR | | | MITIGATION SQUARE FOOTAGE DUE AND SHOW THE AMOUNT FOR | | | EACH TREE PROPOSED TO BE REMOVED. | | | COLUMN SHOULD BE LABELED MITIGATION DUE, NOT TREE | | | CREDITS. TREES WITH A CANOPY 20 FEET OR MORE IN | | | DIAMETER MUST HAVE THE ACTUAL SQUARE FOOTAGE CALCULATED | | | AND ENTERED ON THE CHART. | | | ? PARTIALLY SATISFIED. PROVIDE TOTAL OF MITIGATION | | | SQUARE FOOTAGE DUE. | | | UPDATE TOTAL WITH MITIGATION RECALCULATED FOR ABOVE. | | | ? PARTIALLY SATISFIED. PROVIDE A TOTAL OF MITIGATION | | | SQUARE FOOTAGE PROVIDED BASED ON THE PLANT LIST. | | | PROVIDE A CHART WITH THE TOTAL FOR EACH SPECIES AND | | | REMOVE MITIGATION CALCULATIONS FROM SHEET L11, THEY ARE | | | INCORRECT. TREE CATEGORY LIST MUST BE USED FOR | | | MITIGATION CREDITS. CATEGORY 1 IS 300 SQ FT CANOPY | | | CREDIT, CATEGORY 2 IS 150 SQ FT CANOPY CREDIT, CATEGORY | | | 3 IS 100 SQ FT CANOPY CREDIT, CATEGORY 4 IS 50 SQ FT | | | CANOPY CREDIT, | | | | | | 2. PARTIALLY SATISFIED. SECTION 94-448 (D)(3) REQUIRES | | | NATIVE TREES IN GOOD CONDITION TO BE PRESERVED ON SITE | | | OR RELOCATED. ANSI A 300 (PART 5) STANDARDS SPECIFY | | | EXAMPLES OF SUITABILITY RATINGS OF GOOD, MODERATE, OR | | | POOR FOR RELOCATION. PROVIDE AN ARBORIST REPORT SHOWING | | | CONDITION FOR ALL TREES AND RELOCATION POTENTIAL FOR | | | THE NATIVE TREES. ALL INDIVIDUAL TREES NEED AN ACCURATE | | | REASON FOR REMOVAL PROVIDED, CANNOT BE A GENERAL | | | STATEMENT, SO REMOVE THE NOTE. | | | REMOVE NOTE ON TREE DISPOSITION SCHEDULE SHEET L1A | | | REGARDING REMOVAL OF TREES AS IT IS NOT ACCURATE OR | | | RELEVANT. | | | THE ARBORIST REPORT LISTS ONLY TREE #12 AS GOOD | | | CONDITION. PROVIDE THE REASON FOR NOT RELOCATING. | | | | | | 3. PARTIALLY SATISFIED. PROVIDE A DIAGRAM OF THE | | | PROVIDED 25% PRIVATE OPEN SPACE AREAS FOR CWD-10. | | | IDENTIFY THE TYPE OF OPEN SPACE AS ALLOWED BY TABLE | | | IV-7 AND DEFINITIONS IN SECTION 94-109. SHOW HOW THE | | | STANDARDS FOR THE TYPES OF OPEN SPACE ARE MET FOR | | | VEGETATED AREAS AND TREE CANOPY SQUARE FOOTAGE BASED ON | | | TABLE IV-8. | | | SHOW EACH TERRACE PRIVATE OPEN SPACE SQUARE FOOTAGE AND | | | HOW IT INDIVIDUALLY MEETS THE 20% VEGETATED AREA. THEY | | | CAN SHOW THE TOTAL AREA PROVIDED, BUT EACH SPACE MUST | | | MEET THE REQUIREMENTS. PROVIDE ALL SQUARE FOOTAGE AND | | | PERCENTAGE MEASUREMENTS ON SHEET L8A. | | | | | | | | | 4. PARTIALLY SATISFIED. PROVIDE CALCULATIONS FOR | | | REQUIRED STREET TREES AT ONE FOR EVERY 30 FEET OR | | | PORTION THEREOF FOR STREETSCAPE LENGTH, AND SHOW THE | | | NUMBER PROVIDED PER SECTION 94-113 AND 94-116. | | | STREET TREE CALCULATIONS AND PLAN NEED TO BE PROVIDED. | | | OLIVE AVE SIDE OF CLEMATIS BUILDING NEEDS TO BE | | | INCLUDED. REFERENCE THE APPROVED STREETSCAPE PLANS FOR | | | THE BANYAN STREETSCAPE PROJECT. | | | PROVIDE THE CALCULATIONS FOR EACH STREETSCAPE LENGTH | | | FOR BANYAN AND OLIVE ALONG 300 BANYAN AND DIVIDE BY 30 | | | AND ROUND UP TO SHOW THE REQUIRED NUMBER OF STREET | | | TREES FOR EACH SIDE. PROVIDE THE NUMBER OF SHADE TREES | | | FOR EACH SIDE. PALMS MAY NOT BE COUNTED TOWARD SHADE | | | TREE REQUIREMENT. THERE IS ENOUGH ROOM TO USE LIVE OAKS | | | FOR ALL REQUIRED STREET TREES. | | | | | | 5. PARTIALLY SATISFIED. SHOW THE LOCATIONS OF THE | | | REQUIRED STRUCTURAL SOIL UNDER HARDSCAPE PER SECTION | | | 94-113 AND PROVIDE THE TYPICAL DETAIL FOR INSTALLATION. | | | THE AREA MUST BE 9 X14 FT PARALLEL TO THE CURB FOR EACH | | | TREE CONSISTING OF PLANTING AREA AND/OR STRUCTURAL | | | SOIL. | | | SHOW THE LOCATIONS ON THE LANDSCAPE PLAN. | | | | | | 6. SATISFIED. THERE APPEAR TO BE CONFLICTS IN SEVERAL | | | LOCATIONS BETWEEN PROPOSED STREET TREES AND DRAINAGE | | | EXFILTRATION LINES ON THE LANDSCAPE PLAN. ADJUST | | | DRAINAGE LOCATIONS SO THEY DO NOT INFRINGE ON THE | | | REQUIRED PLANTING AREA OR STRUCTURAL SOIL. | | | | | | 7. SATISFIED. SHOW THE LOCATIONS OF ALL UTILITIES ON | | | THE LANDSCAPE PLAN AND RESOLVE ANY CONFLICTS. | | | | | | 8. PARTIALLY SATISFIED. PER SECTION 94-113 TREE GRATES | | | ARE ONLY TO BE USED IF PLANTING STRIPS ARE NOT | | | POSSIBLE. PLANTING STRIP WITH PAVER PASS THROUGHS FOR | | | PARKING SPACE ACCESS ARE WARRANTED ON BANYAN. IF | | | PARKING IS NOT APPROVED ON BANYAN, PLANTING STRIPS MUST | | | BE USED. | | | THE PLANTING AREAS NEED TO BE LENGTHENED ALONG BOTH | | | STREETS WITH PASS THROUGHS PLACED FOR PEDESTRIAN ACCESS | | | FROM THE DROP OFFS. | | | | | | | | | 9. PARTIALLY SATISFIED. PROVIDE A COMPLETE PLANT LIST. | | | PLANT LIST NEEDS TO BE MODIFIED TO SEPARATE THE | | | REQUIRED OPEN SPACE PLANT LISTS AND THE SEPARATE | | | BUILDINGS. | | | | | | 10. SATISFIED. REMOVE HIGHRISE CULTIVAR AND INDICATE | | | SPECIES LIVE OAK OR CATHEDRAL LIVE OAK. | | | | | | 11. SATISFIED. ADD A COLUMN FOR DROUGHT TOLERANCE LEVEL | | | TO THE PLANT LIST. | | | | | | 12. PARTIALLY SATISFIED. SHOW COMPLIANCE WITH SECTION | | | 94-445 L. PLANT SPECIES. A MINIMUM OF 60 PERCENT OF | | | PLANT MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT | | | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE | | | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH | | | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH | | | FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED | | | ON THE PLANT LIST. | | | REVISE AFTER ALL CHANGES ARE COMPLETE WITH LANDSCAPE | | | PLAN. | | | | | | 13. PARTIALLY SATISFIED. PROVIDE BUFFER REQUIREMENTS ON | | | THE CHART AND LANDSCAPE PLAN FOR THE WEST AREA OF THE | | | LOT ADJACENT TO THE PROPERTY LINE. STAFF REQUESTS | | | ADDING ANY LANDSCAPING SUCH AS HEDGING ALONG THE ALLEY | | | PROPERTY LINE TO IMPROVE THE ENVIRONMENT. | | | PROVIDE THE ENTIRE PROPERTY LINE LENGTH FOR THE WEST | | | BUFFER, DIVIDE BY 30 AND ROUND UP FOR THE REQUIRED | | | NUMBER OF BUFFER TREES. SHOW THE NUMBER PROVIDED. SABAL | | | PALMS ARE A 3:1 EQUIVALENT TO A REQUIRED TREE. | | | | | | 14. MAKE THE FOLLOWING CORRECTIONS TO THE PLANTING | | | NOTES ON SHEET L10: | | | ? SATISFIED. CORRECT TO REMOVE CYPRESS MULCH FROM THE | | | NOTE, IT IS NOT ALLOWED. | | | ? SATISFIED. ALL PLANTING AREAS SHALL BE NOTED TO BE | | | BACKFILLED WITH 50/50 MIX OR SIMILAR TO A DEPTH OF 30 | | | INCHES. | | | ? SATISFIED. INDICATE ALL PLANT MATERIAL TO BE GRADE#1 | | | OR BETTER. | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | STREET TREES AND RIGHT OF WAY LANDSCAPING AND | | | IRRIGATION APPROVED WITH THIS PETITION. | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A | | | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
08-11-2021 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
08-11-2021 |
Time |
15:45 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
08-11-2021 |
Time |
15:45 |
Sent To |
|
|
| Notes |
| 2021-08-11 15:46:25 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 300 BANYAN Z21070018 | | | AUGUST 10, 2021 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | | | | 1. MAKE THE FOLLOWING CORRECTIONS TO THE TREE | | | DISPOSITION PLAN: | | | ? ADD A COLUMN TO THE CHART FOR MITIGATION SQUARE | | | FOOTAGE DUE AND SHOW THE AMOUNT FOR EACH TREE PROPOSED | | | TO BE REMOVED. | | | ? PROVIDE TOTAL OF MITIGATION SQUARE FOOTAGE DUE. | | | ? PROVIDE A TOTAL OF MITIGATION SQUARE FOOTAGE PROVIDED | | | BASED ON THE PLANT LIST. | | | | | | 2. SECTION 94-448 (D)(3) REQUIRES NATIVE TREES IN GOOD | | | CONDITION TO BE PRESERVED ON SITE OR RELOCATED. ANSI A | | | 300 (PART 5) STANDARDS SPECIFY EXAMPLES OF SUITABILITY | | | RATINGS OF GOOD, MODERATE, OR POOR FOR RELOCATION. | | | PROVIDE AN ARBORIST REPORT SHOWING CONDITION FOR ALL | | | TREES AND RELOCATION POTENTIAL FOR THE NATIVE TREES. | | | ALL INDIVIDUAL TREES NEED AN ACCURATE REASON FOR | | | REMOVAL PROVIDED, CANNOT BE A GENERAL STATEMENT, SO | | | REMOVE THE NOTE. | | | | | | | | | 3. PROVIDE A DIAGRAM OF THE PROVIDED 25% PRIVATE OPEN | | | SPACE AREAS FOR CWD-10. IDENTIFY THE TYPE OF OPEN SPACE | | | AS ALLOWED BY TABLE IV-7 AND DEFINITIONS IN SECTION | | | 94-109. SHOW HOW THE STANDARDS FOR THE TYPES OF OPEN | | | SPACE ARE MET FOR VEGETATED AREAS AND TREE CANOPY | | | SQUARE FOOTAGE BASED ON TABLE IV-8. | | | | | | | | | 4. PROVIDE CALCULATIONS FOR REQUIRED STREET TREES AT | | | ONE FOR EVERY 30 FEET OR PORTION THEREOF FOR | | | STREETSCAPE LENGTH, AND SHOW THE NUMBER PROVIDED PER | | | SECTION 94-113 AND 94-116. | | | STREET TREE CALCULATIONS AND PLAN NEED TO BE PROVIDED. | | | OLIVE AVE SIDE OF CLEMATIS BUILDING NEEDS TO BE | | | INCLUDED. REFERENCE THE APPROVED STREETSCAPE PLANS FOR | | | THE BANYAN STREETSCAPE PROJECT. | | | | | | 5. SHOW THE LOCATIONS OF THE REQUIRED STRUCTURAL SOIL | | | UNDER HARDSCAPE PER SECTION 94-113 AND PROVIDE THE | | | TYPICAL DETAIL FOR INSTALLATION. THE AREA MUST BE 9 X14 | | | FT PARALLEL TO THE CURB FOR EACH TREE CONSISTING OF | | | PLANTING AREA AND/OR STRUCTURAL SOIL. | | | | | | 6. THERE APPEAR TO BE CONFLICTS IN SEVERAL LOCATIONS | | | BETWEEN PROPOSED STREET TREES AND DRAINAGE EXFILTRATION | | | LINES ON THE LANDSCAPE PLAN. ADJUST DRAINAGE LOCATIONS | | | SO THEY DO NOT INFRINGE ON THE REQUIRED PLANTING AREA | | | OR STRUCTURAL SOIL. | | | | | | 7. SHOW THE LOCATIONS OF ALL UTILITIES ON THE LANDSCAPE | | | PLAN AND RESOLVE ANY CONFLICTS. | | | | | | 8. PER SECTION 94-113 TREE GRATES ARE ONLY TO BE USED | | | IF PLANTING STRIPS ARE NOT POSSIBLE. PLANTING STRIP | | | WITH PAVER PASS THROUGHS FOR PARKING SPACE ACCESS ARE | | | WARRANTED ON BANYAN. IF PARKING IS NOT APPROVED ON | | | BANYAN, PLANTING STRIPS MUST BE USED. | | | | | | 9. PROVIDE A COMPLETE PLANT LIST. PLANT LIST NEEDS TO | | | BE MODIFIED TO SEPARATE THE REQUIRED OPEN SPACE PLANT | | | LISTS AND THE SEPARATE BUILDINGS. | | | | | | 10. REMOVE HIGHRISE CULTIVAR AND INDICATE SPECIES LIVE | | | OAK OR CATHEDRAL LIVE OAK. | | | | | | 11. ADD A COLUMN FOR DROUGHT TOLERANCE LEVEL TO THE | | | PLANT LIST. | | | | | | 12. SHOW COMPLIANCE WITH SECTION 94-445 L. PLANT | | | SPECIES. A MINIMUM OF 60 PERCENT OF PLANT MATERIAL | | | ADDED SHALL BE FLORIDA NATIVE OR DROUGHT TOLERANT | | | SPECIES SELECTED FROM THE CITY LIST OR THE LIST OF | | | SPECIES IN THE MOST RECENT EDITION OF SOUTH FLORIDA | | | WATER MANAGEMENT DISTRICT WATERWISE SOUTH FLORIDA | | | LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED ON THE | | | PLANT LIST. | | | REVISE AFTER ALL CHANGES ARE COMPLETE WITH LANDSCAPE | | | PLAN. | | | | | | 13. PROVIDE BUFFER REQUIREMENTS ON THE CHART AND | | | LANDSCAPE PLAN FOR THE WEST AREA OF THE LOT ADJACENT TO | | | THE PROPERTY LINE. STAFF REQUESTS ADDING ANY | | | LANDSCAPING SUCH AS HEDGING ALONG THE ALLEY PROPERTY | | | LINE TO IMPROVE THE ENVIRONMENT. | | | | | | 14. MAKE THE FOLLOWING CORRECTIONS TO THE PLANTING | | | NOTES ON SHEET L10: | | | ? CORRECT TO REMOVE CYPRESS MULCH FROM THE NOTE, IT IS | | | NOT ALLOWED. | | | ? ALL PLANTING AREAS SHALL BE NOTED TO BE BACKFILLED | | | WITH 50/50 MIX OR SIMILAR TO A DEPTH OF 30 INCHES. | | | ? INDICATE ALL PLANT MATERIAL TO BE GRADE#1 OR BETTER. | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PU |
PUBLIC UTILITIES |
| Rev No |
1 |
Status |
F |
Date |
01-21-2022 |
|
|
Cont ID |
|
| Sent By |
mtechnow |
Date |
01-21-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
01-21-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-01-21 19:50:35 | COMMENTS FOR THE REFERENCED PROJECT: | | | | | | -SHOW EXISTING UNDERGROUND UTILITIES ON OLIVE AVE AND | | | IN THE ALLEY. | | | -ADD NOTE/CALL OUT PROPOSED AND EXISTING UTILITY | | | CONFLICTS WITH ELEVATIONS. | | | -PROFILE OF PROPOSED SERVICE LINES SHOWING ELEVATIONS | | | AND CONFLICTS FROM TAP TO POINT OF SERVICE WILL BE | | | REQUIRED. | | | - ADD NOTE THAT WATER MAIN TIE-IN IS TO PROCEED AFTER | | | THE CONTRACTOR HAS SUBMITTED A CONSTRUCTION PHASING | | | PLAN FOR PIGGING/FLUSHING TO THE CITY AND RECEIVING PBC | | | HEALTH DEPARTMENT APPROVAL. | | | -INSERT COWPB STANDARD DETAIL GS-7 ?DOGHOUSE MANHOLE? | | | ON DETAIL SHEET. | | | -THE GRAVITY SEWER IS REQUIRED TO HAVE A CASING THROUGH | | | THE CONFLICT MANHOLE. INSERT COWPB STANDARD DETAIL P-10 | | | FOR THE CASING AND THE FDOT CONFLICT MANHOLE STANDARD | | | DETAIL INDEX 425-080 INTO THE PLANS. | | | |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
2 |
Status |
P |
Date |
09-29-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
09-29-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
09-29-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-09-29 15:44:19 | CONDITION OF APPROVAL: | | | 1- THE SANITATION CONTAINERS SHALL BE FRONT LOAD TYPE | | | IN ORDER FOR THE CITY COLLECTION TRUCKS BE ABLE TO | | | PROVIDE THE SERVICE. | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
F |
Date |
08-02-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
08-02-2021 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
08-02-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-08-02 15:02:12 | PLEASE PROVIDE THE FOLLOWINGS: | | | 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID | | | WASTE VOLUME PRODUCED ALONG WITH THE SIZE, TYPE AND | | | QUANTITY OF THE CONTAINER (I.E. DUMPSTER/COMPACTOR) | | | THAT WILL BE UTILIZED THAT WILL BE UTILIZED FOR THE | | | SANITATION SERVICE. | | | 2- DETAILS FOR SANITATION SERVICE (I.E. SOLID WASTE | | | CONTAINER(S) TYPE, COLLECTION LOCATION, TRASH ROOM | | | SPECS, ETC.). | | | 3- AUTOTURN EXHIBIT (DYNAMIC ENVELOPE AND THE VEHICLE?S | | | WHEEL PATH) FOR THE SANITATION SERVICE, FRONT LOADER | | | TRUCK WITH THE FOLLOWING SPECS: | | | - DUAL AXLES | | | - TRUCK LENGTH: 35 FT | | | - TRUCK WIDTH: 11 FT | | | - TURNING RADIUS: | | | - SAE TURNING RADIUS: 32.5 FT | | | - CURB-TO-CURB DIAMETER: 74 FT | | | - WALL-TO-WALL DIAMETER: 86.3 FT | | | | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
08-12-2021 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
08-12-2021 |
Time |
09:24 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
08-12-2021 |
Time |
09:26 |
Sent To |
|
|
| Notes |
| 2021-08-12 09:24:42 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. THE CITY'S OFFICIAL VERTICAL DATUM PER CITY CODE IS | | | NGVD1929. THE CITY IS ALLOWING SURVEYS AND PLANS TO USE | | | NAVD1988 PROVIDED THE CONVERSION EQUATION BETWEEN | | | NAVD1988 AND NGVD1929 IS ALSO PROVIDED. PROVIDE THE | | | CONVERSION EQUATION TO NGVD1929 ON THE SURVEY. | | | | | | 2. PROVIDE PIPE MATERIAL, PIPE INVERTS OF EXISTING | | | DRAINAGE SYSTEM IN THE PUBLIC RIGHTS OF WAY. | | | | | | 3. THE STORM PIPE ALONG THE WEST PROPERTY LINE APPEARS | | | TO BE LOCATED UNDER THE PROPOSED BUILDING. | | | | | | 4. DO NOT CONNECT THE ONSITE DRAINAGE SYSTEM FOR 300 | | | BANYAN TO THE EXISTING ALLEY DRAINAGE SYSTEM. | | | | | | 5. EXPLORE CONNECTING THE ROOF DRAINS IN THE ALLEY FOR | | | 301 CLEMATIS TO THE ALLEY DRAINAGE SYSTEM. | | | | | | 6. INDICATE IF THE EXISTING ELECTRICAL CONDUITS WILL | | | REMAIN ONSITE. | | | | | | 7. MOVE SANITARY MH2 OUT OF THE ALLEY R/W. | | | | | | 8. ON THE EROSION CONTROL PLAN, SHOW INLET PROTECTION | | | FOR DRAINAGE STRUCTURES WITH THE R/W. | | | | | | 9. PROVIDE DETAIL FOR SPECIAL TYPE 'F' CURB AND GUTTER | | | USED IN THE DOWNTOWN AREA. | | | | | | 10. PROVIDE TYPICAL CROSS SECTIONS FROM THE FACE OF | | | BUILDING TO THE CENTERLINE OF THE R/W. | | | | | | 11. PROVIDE CROSS SECTION OF THE ALLEY FROM BUILDING | | | FACE TO BUILDING FACE. | | | | | | 12. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP | | | CRITERIA. | | | | | | 13. THE CITY DOES NOT ALLOW THE USE OF BLEEDERS IN | | | CONTROL STRUCTURES USED TO SURCHARGE EXFILTRATION | | | TRENCHES. | | | | | | 14. CONSIDER ALTERNATIVE STORMWATER STORAGE SYSTEM. | | | EXFILTRATION SYSTEMS CAN HAVE A SHORT LIFE SPAN. | | | | | | 15. COORDINATE DESIGN WITH THE BANYAN BLVD STREETSCAPE | | | PROJECT. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY | | | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. | | | | | | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED | | | WITH THE ENGINEERING PERMIT APPLICATION. | | | | | | 3. PROVIDE COPY OF SFWMD ERP PERMIT(S) BEFORE START OF | | | CONSTRUCTION. | | | | | | 4. PROVIDE A COPY OF THE DRAINAGE CALCULATIONS WITH THE | | | ENGINEERING PERMIT APPLICATION. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
F |
Date |
10-14-2021 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
10-14-2021 |
Time |
07:22 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-10-14 07:30:34 | 1. ELEVATIONS SHOW ENCROACHMENTS INTO RIGHTS-OF-WAY. | | | AERIAL ENCROACHMENT EASEMENTS WILL BE REQUIRED. NO | | | BUILDING ENCROACHMENTS ARE PERMITTED. | | | 2. REPLAT AND MAINTENANCE AGREEMENT REQUIRED PRIOR TO | | | C.O. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
08-10-2021 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
08-10-2021 |
Time |
13:04 |
Rev Time |
|
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-08-10 13:19:18 | 1. REVISE SURVEY TO REMOVE PORTION OF OLIVE AVE. TAKEN | | | BY MAINTENANCE MAP. REVISE ACREAGE AND PLANS | | | ACCORDINGLY. | | | 2. SHOW DEED AND EASEMENT ALONG BANYAN BLVD. IN AREA OF | | | MAINTENANCE MAP. | | | 3. REPLAT WILL BE REQUIRED. | | | 4, MAINTENANCE AGREEMENT WILL BE REQUIRED FOR | | | IMPROVEMENTS WITHIN RIGHT-OF-WAYS. |
|
|
| Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
3 |
Status |
F |
Date |
12-22-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
12-22-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-12-22 18:04:25 | TRAFFIC COMMENTS | | | 1) SATISFIED. PROVIDE COUNTY TPS LETTER. IT WAS NOT | | | PROVIDED IN THE LATEST RE-SUBMISSION. | | | 2) SATISFIED. PROVIDE SITE PLAN WITH PROPOSED | | | TRANSPORTATION FEATURES (I.E. ROAD, SIDEWALK, CURB, | | | DRIVEWAY) PROPERLY LABELED AND EXACT WIDTHS SHOWCASED. | | | IF ALREADY PROVIDED, PLEASE INDICATE SPECIFIC FILE NAME | | | AND/OR SHEET NUMBER(S). LATEST RE-SUBMISSION DID NOT | | | INDICATE ANY FILE NOR SHEET NUMBER. | | | 3) SATISFIED. CONSIDER DESIGNATING THE ALLEY AS ONE-WAY | | | AND COORDINATE WITH SANITATION PERTAINING BEST | | | DIRECTION. AFTER INTERNAL CONSULTATION WITH SANITATION, | | | THE ALLEYWAY SHALL BE DESIGNATED ONE-WAY EASTBOUND | | | 4) SATISFIED. PROVIDE A WIDER SIDEWALK ALONG OLIVE | | | AVENUE. PLEASE REFER TO COMMENT #2. | | | 5) SATISFIED. ON THE SITE PLAN, PLEASE SHOWCASE BASIC | | | CURB DETAILS (I.E. DRIVEWAY AND PARKING STALLS) ON THE | | | OPPOSITE SIDE OF THE ROADS SURROUNDING THE PROPOSED | | | DEVELOPMENT. LATEST CIVIL DRAWINGS DO NOT SHOW THE | | | REQUESTED FEATURES | | | 6) SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE | | | TRUCK AND SERVICE VEHICLES DRIVING IN AND OUT OF THE | | | PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES | | | CLEARLY DEFINED. ANALYSIS SHOULD BE PROVIDED IN A | | | SEPARATE FILE/DRAWING. UPDATE ANALYSIS ASSUMING | | | ALLEYWAY DESIGNATION AS ONE-WAY EASTBOUND. | | | 7) SATISFIED. IDENTIFY AND DESIGNATE AN EASILY | | | ACCESSIBLE MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20 | | | FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS | | | (CIRCUIT BOX AND ELECTRIC CONDUIT). PROVIDE FILE | | | NAME/SHEET NUMBER, CLEARLY MARK AND PLACE A CALLOUT FOR | | | THE AREA. | | | 8) SATISFIED. PROVIDE PARKING TABLE SHOWCASING THE | | | NUMBER OF REQUIRED AND PROVIDED PARKING SPACES, | | | INCLUSIVE OF ADA AND BICYCLE ONES | | | 9) SATISFIED. PLEASE PROVIDE AN INTERSECTION ANALYSIS | | | FOR THE BANYAN AND DIXIE INTERSECTION. FUTURE | | | CONDITIONS SHALL ASSUME BANYAN BLVD COMPLETE STREET | | | CONFIGURATION | | | 10) PARTIALLY SATISFIED. SETUP A MEETING WITH PLANNING | | | AND ENGINEERING TO DISCUSS TRANSPORTATION DEMAND | | | MANAGEMENT MEASURES, AS THE TRIPS GENERATED BY THE | | | PROPOSED DEVELOPMENT ARE EXCEEDING THE CAPACITY | | | ESTIMATED BY THE BANYAN BOULEVARD COMPLETE STREET | | | PROJECT. PROVIDE A DRAFT TDM DOCUMENT AND REACH MUTUAL | | | AGREEMENT ON THE PROPOSED MEASURES. | | | | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
2 |
Status |
F |
Date |
10-14-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
10-14-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-10-14 18:52:37 | 1) NOT SATISFIED. PROVIDE COUNTY TPS LETTER. IT WAS NOT | | | PROVIDED IN THE LATEST RE-SUBMISISON. | | | 2) NOT SATISFIED. PROVIDE SITE PLAN WITH PROPOSED | | | TRANSPORTATION FEATURES (I.E. ROAD, SIDEWALK, CURB, | | | DRIVEWAY) PROPERLY LABELED AND EXACT WIDTHS SHOWCASED. | | | IF ALREADY PROVIDED, PLEASE INDICATE SPECIFIC FILE NAME | | | AND/OR SHEET NUMBER(S). LATEST RE-SUBMISSION DID NOT | | | INDICATE ANY FILE NOR SHEET NUMBER. | | | 3) PARTIALLY SATISFIED. CONSIDER DESIGNATING THE ALLEY | | | AS ONE-WAY AND COORDINATE WITH SANITATION PERTAINING | | | BEST DIRECTION. AFTER INTERNAL CONSULTATION WITH | | | SANITATION, THE ALLEYWAY SHALL BE DESIGNATED ONE-WAY | | | EASTBOUND | | | 4) PARTIALLY SATISFIED. PROVIDE A WIDER SIDEWALK ALONG | | | OLIVE AVENUE. PLEASE REFER TO COMMENT #2. | | | 5) NOT SATISFIED. ON THE SITE PLAN, PLEASE SHOWCASE | | | BASIC CURB DETAILS (I.E. DRIVEWAY AND PARKING STALLS) | | | ON THE OPPOSITE SIDE OF THE ROADS SURROUNDING THE | | | PROPOSED DEVELOPMENT. LATEST CIVIL DRAWINGS DO NOT SHOW | | | THE REQUESTED FEATURES | | | 6) PARTIALLY SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR | | | GARBAGE TRUCK AND SERVICE VEHICLES DRIVING IN AND OUT | | | OF THE PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC | | | ENVELOPES CLEARLY DEFINED. ANALYSIS SHOULD BE PROVIDED | | | IN A SEPARATE FILE/DRAWING. UPDATE ANALYSIS ASSUMING | | | ALLEYWAY DESIGNATION AS ONE-WAY EASTBOUND. | | | 7) NOT SATISFIED. IDENTIFY AND DESIGNATE AN EASILY | | | ACCESSIBLE MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20 | | | FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS | | | (CIRCUIT BOX AND ELECTRIC CONDUIT). PROVIDE FILE | | | NAME/SHEET NUMBER, CLEARLY MARK AND PLACE A CALLOUT FOR | | | THE AREA. | | | 8) SATISFIED. PROVIDE PARKING TABLE SHOWCASING THE | | | NUMBER OF REQUIRED AND PROVIDED PARKING SPACES, | | | INCLUSIVE OF ADA AND BICYCLE ONES | | | 9) PLEASE PROVIDE AN INTERSECTION ANALYSIS FOR THE | | | BANYAN AND DIXIE INTERSECTION. FUTURE CONDITIONS SHALL | | | ASSUME BANYAN BLVD COMPLETE STREET CONFIGURATION | | | 10) SETUP A MEETING WITH PLANNING AND ENGINEERING TO | | | DISCUSS TRANSPORTATION DEMAND MANAGEMENT MEASURES, AS | | | THE TRIPS GENERATED BY THE PROPOSED DEVELOPMENT ARE | | | EXCEEDING THE CAPACITY ESTIMATED BY THE BANYAN | | | BOULEVARD COMPLETE STREET PROJECT | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
08-12-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
08-12-2021 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-08-12 12:39:33 | TRAFFIC COMMENTS | | | 1) PROVIDE COUNTY TPS LETTER | | | 2) PROVIDE SITE PLAN WITH PROPOSED TRANSPORTATION | | | FEATURES (I.E. ROAD, SIDEWALK, CURB, DRIVEWAY) PROPERLY | | | LABELED AND EXACT WIDTHS SHOWCASED. IF ALREADY | | | PROVIDED, PLEASE INDICATE SPECIFIC FILE NAME AND/OR | | | SHEET NUMBER(S) | | | 3) CONSIDER DESIGNATING THE ALLEY AS ONE-WAY AND | | | COORDINATE WITH SANITATION PERTAINING BEST DIRECTION | | | 4) PROVIDE A WIDER SIDEWALK ALONG OLIVE AVENUE | | | 5) ON THE SITE PLAN, PLEASE SHOWCASE BASIC CURB DETAILS | | | (I.E. DRIVEWAY AND PARKING STALLS) ON THE OPPOSITE SIDE | | | OF THE ROADS SURROUNDING THE PROPOSED DEVELOPMENT | | | 6) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND | | | SERVICE VEHICLES DRIVING IN AND OUT OF THE PROPOSED | | | DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES CLEARLY | | | DEFINED. ANALYSIS SHOULD BE PROVIDED IN A SEPARATE | | | FILE/DRAWING | | | 7) IDENTIFY AND DESIGNATE AN EASILY ACCESSIBLE | | | MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20 FEET) AND | | | PROVIDE BASIC ELECTRIFICATION READINESS (CIRCUIT BOX | | | AND ELECTRIC CONDUIT) | | | 8) PROVIDE PARKING TABLE SHOWCASING THE NUMBER OF | | | REQUIRED AND PROVIDED PARKING SPACES, INCLUSIVE OF ADA | | | AND BICYCLE ONES | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
5 |
Status |
P |
Date |
01-26-2022 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
01-26-2022 |
Time |
14:23 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-01-26 14:24:03 | PASSED WITH CONDITONOS OF APPROVAL AS INCLUDED IN SITE | | | PLAN APPROVAL LETTER AND DAC FINAL ORDER. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
F |
Date |
12-17-2021 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
12-17-2021 |
Time |
16:57 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-12-17 17:07:19 | 1. PLEASE ADJUST GROUND FLOOR PLAN TO REFLECT THAT THE | | | ENCLOSURE OF THE AREA LABELED AS CAFE IS AN OPEN FENCE | | | OR THE SPACE SHALL BE COUNTED AS GBA. | | | 2. PLEASE UPDATE THE LANDSCAPE PLAN TO REFLECT DAC | | | CONDITION OF APPROVAL. | | | 3. PLEASE ADJUST SITE PLAN AND CIVIL DRAWINGS TO | | | REFLECT THAT THE SIDEWALK ELEVATION WILL BE MAINTAINED | | | ACROSS THE GARAGE DRIVEWAY. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
11-18-2021 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
11-18-2021 |
Time |
16:14 |
Rev Time |
0.00 |
| Received By |
ckimmerl |
Date |
11-18-2021 |
Time |
16:14 |
Sent To |
|
|
| Notes |
| 2021-11-18 16:14:22 | SETBACKS: | | | 1. BANYAN BOULEVARD 16? SETBACK NOT MET, APPEARS TO BE | | | 14? IN DRAWINGS. | | | [NOT SATISFIED] MINIMUM SETBACK SHALL BE 16? FROM NEW | | | BACK OF CURB WITH BANYAN STREETSCAPE IMPROVEMENTS, | | | DRAWINGS SHOW ~ 15? SETBACK. SUGGEST SHORTENING THE | | | WIDTH OF DROP-OFF TO ADJUST PROMINENT CURB LINE FROM | | | WHICH THE SETBACK IS MEASURED OR MAKE THE DROP-OFF AREA | | | NARROWER. ALTERNATIVE TO ASK FOR 5% VARIANCE ON | | | SETBACK. | | | 2. PLEASE CLEARLY INDICATE SETBACK LINE IN ALL FLOOR | | | PLANS, ELEVATIONS, AND SECTIONS TO CONFIRM COMPLIANCE. | | | [PARTIALLY SATISFIED] SHEET A-1 SITE PLAN COULD ALSO | | | INCLUDE SETBACK LINES. | | | | | | OPEN SPACE: | | | 3. PLEASE UPDATE TABLE IN SHEET L4 TO REFLECT THAT THE | | | PRIVATE OPEN SPACE IS CALCULATED FOR THE TWO SITES. | | | [NOT SATISFIED] 25% OF THE LOT AREA MUST BE PRIVATE | | | OPEN SPACE. PRIVATE OPEN SPACE IS REQUIRED TO BE ?OPEN | | | TO THE SKY?. PLEASE PROVIDE BREAKDOWN OF 7TH FLOOR, | | | 10TH FLOOR, AND ROOFTOP TERRACES. CALCULATE WHAT | | | PERCENTAGE OF THESE TERRACES CONSTITUTE AS PRIVATE OPEN | | | SPACE THAT IS OPEN TO THE SKY. 20% OF EACH COMPONENT OF | | | THE PRIVATE OPEN SPACE MUST BE VEGETATED. MAY REQUIRE | | | VARIANCE. | | | | | | ACTIVE USE: | | | 4. MINOR TEXT ERROR, BOTH BANYAN AND OLIVE ARE PRIMARY | | | PEDESTRIAN STREETS IN THIS AREA (SHEET A-1 REFERS TO | | | OLIVE AS AN AVENUE). | | | [PARTIALLY SATISFIED] MINOR TEXT ERROR, BANYAN ACTIVE | | | USE REQUIRED LINER (2-3 STORY) IS 60% NOT 50%. | | | 5. WILL REQUIRE VARIANCE FOR GROUND LEVEL ACTIVE USE | | | REQUIREMENT ALONG OLIVE; REQUIRED 80% OF FRONTAGE; | | | PROVIDED 62% (VARIANCE OF 18% OR 48.75? DIFFERENCE) | | | [SATISFIED] VARIANCE IS REQUESTED. | | | 6. WILL REQUIRE VARIANCE FOR GROUND LEVEL ACTIVE USE | | | REQUIREMENT ALONG BANYAN; REQUIRED 65% OF FRONTAGE; | | | PROVIDED 46% (VARIANCE OF 19% OR 30.92? DIFFERENCE) | | | [SATISFIED] VARIANCE IS REQUESTED. | | | 7. PLEASE INCLUDE GRAPHIC CALCULATIONS FOR THE ACTIVE | | | USE REQUIREMENTS INDICATING IN THE FLOOR PLAN WHAT IS | | | BEING COUNTED AND THE RESULTING PERCENTAGES. PLEASE | | | REVISE THE CALCULATED FRONTAGES AND PERCENTAGES OF | | | ACTIVE USE BASED ON THE BUILDABLE LOT FRONTAGE. | | | [PARTIALLY SATISFIED] ALLEY SHOULD NOT BE COUNTED AS | | | ACTIVE USE. PLEASE INDICATE OUTDOOR DINING/PATIO ALONG | | | OLIVE AND BANYAN AS AN ACTIVE USE ALTERNATIVE. | | | 8. PROPOSED PROJECT IS NOT IN COMPLIANCE WITH MINIMUM | | | LINER ACTIVE USES [2 TO 3 STORIES (44?)] WHICH REQUIRES | | | 60%. | | | [SATISFIED] VARIANCE IS REQUESTED. | | | 9. WILL REQUIRE VARIANCE FOR 2ND AND 3RD STORY ACTIVE | | | USE LINER REQUIREMENT ALONG OLIVE AVE AND BANYAN BLVD; | | | REQUIRED 60%; PROVIDED 0% (VARIANCE OF 60%) | | | [SATISFIED] VARIANCE IS REQUESTED. | | | 10. THE 1ST STORY IS A DOUBLE HEIGHT AND IT WILL BE | | | COUNTED AS ONE LEVEL. | | | [SATISFIED] | | | 11. THE ADDITIONAL ENHANCED TREATMENT OF NORTH FACADE | | | PREVIOUSLY DISCUSSED WAS NOT INCLUDED IN THE SUBMITTED | | | DRAWINGS. | | | [SATISFIED] | | | | | | STREETSCAPE: | | | 12. ONGOING COORDINATION IS STILL NEEDED (FOR BANYAN | | | STREETSCAPE IMPROVEMENTS). | | | [NOT SATISFIED] ONGOING | | | 13. DISCUSSIONS ONGOING, DETAILS AND ACTIONS TO BE | | | DETERMINED (FOR SIDEWALK WIDENING). | | | [SATISFIED] DETERMINED SIDEWALK EXTENSION ALONG OLIVE | | | ON 301 IS NOT FEASIBLE. | | | 14. STAFF RECOMMENDS REDUCING THE DROP-OFF ON OLIVE | | | AVE. TO 10? IN WIDTH. FURTHER DISCUSSION NEEDED WITH | | | TRAFFIC ENGINEER. | | | [SATISFIED] STREET TREE LOCATIONS WILL BE SLIGHTLY | | | ADJUSTED AS PER OUR LAST DISCUSSION; REQUIRED NUMBER OF | | | TREES IS MET. TRAFFIC ENGINEER IS OKAY WITH DROP OFF | | | WIDTH KEPT AT 12?. | | | | | | BIKES, PARKING, & LOADING: | | | 15. DISTRIBUTE PUBLIC BIKE PARKING SPACES | | | ALONG/THROUGHOUT THE FRONTAGE. | | | [SATISFIED] | | | 16. SHEET A-1 APPEARS TO SHOW OLD DROP-OFF WITH | | | PEDESTRIAN ISLAND AND TERRACE SEATING IN DROP-OFF ROW, | | | AS OPPOSED TO NEW DROP-OFF CONFIGURATION SHOWN IN | | | LANDSCAPE SHEETS. | | | [SATISFIED] | | | 17. STAFF RECOMMENDS TO REDUCE DROP-OFF WIDTH TO 10?. | | | TALK WITH VALERIO (TRAFFIC ENGINEER) | | | [SATISFIED] TRAFFIC ENGINEER IS OKAY WITH PROPOSED DROP | | | OFF WIDTH. | | | | | | FA?ADE ARTICULATION: | | | 18. B-21 HAS UPDATED ELEVATION (NOT B-18 AS RESPONSE | | | INDICATES). WEST ELEVATION DRAWINGS INCLUDE A BLANK | | | WALL NOT PERMITTED BY CODE. GARAGE FACADE IS MORE THAN | | | 20% OF OVERALL. | | | [SATISFIED] | | | 19. WITHIN THE SUBMITTED DRAWINGS NOT SEEING THE | | | ALTERNATE SCREENING AND FACADE/ARCHITECTURAL TREATMENTS | | | DISCUSSED IN MEETINGS, DID PLANS REVERT TO PREVIOUS | | | DESIGN? PLEASE EXPLAIN HOW IS THE PROJECT COMPLYING | | | WITH THE PLANAR BREAK REQUIREMENTS. | | | [SATISFIED] | | | 20. OKAY WITH ALLEYWAY/NO CHANGE IN SOUTHERN | | | GROUND-FLOOR FACADE. ALLEYWAY RENDERINGS SHOW A CANOPY | | | NOT ILLUSTRATED OR SHOWN IN DRAWINGS, PLEASE PROVIDE | | | MORE DETAILS IN DRAWINGS. | | | [SATISFIED] | | | | | | GENERAL SITE: | | | 21. DISCUSSIONS ONGOING, DETAILS AND ACTIONS TO BE | | | DETERMINED (FOR TRASH COMPACTOR) | | | [NOT SATISFIED] ONGOING | | | 22. DISCUSSIONS ONGOING, DETAILS AND ACTIONS TO BE | | | DETERMINED (ALLEY ORIENTATION DETERMINED EASTBOUND). | | | SPEAK WITH VALERIO (TRAFFIC ENGINEER) EAST-WAY TRAFFIC | | | FLOW MAY BE NEEDED FOR VALET OPERATIONS. EXPLORE | | | OPENING IN GARAGE ON SOUTHWESTERN CORNER? | | | [PARTIALLY SATISFIED] ONGOING | | | 23. FURTHER DISCUSSIONS NECESSARY TO CONFIRM THE | | | PROPOSED IMPROVEMENTS ON THE CITY-OWNED ALLEY ARE | | | VIABLE. | | | [NOT SATISFIED] ONGOING | | | 24. PLEASE UPDATE TABLE TO INCLUDE SEPARATED | | | INFORMATION FOR 301 CLEMATIS AND 300 BANYAN, THEN | | | COMBINED TOTALS. | | | [PARTIALLY SATISFIED] PLEASE PUT IN SHEET A-1. PROJECT | | | DATA TABLE ALONG WITH PROPOSED GBA. | | | TABLE TO INCLUDE: | | | - SITE AREA | | | - ZONING | | | - FAR | | | - ALLOWABLE GBA BY RIGHT __ SF | | | - GBA WITH TDR __ SF | | | - TOTAL ALLOWABLE __ SF | | | - PROPOSED __ SF | | | PLEASE CREATE TABLE FOR BOTH 300 BANYAN AND 301 | | | CLEMATIS. | | | | | | 25. GROUND FLOOR CORRIDORS AND ENCLOSED STORAGE AREAS, | | | ELEVATORS, AND STAIRS NEED TO BE INCLUDED. LABEL EACH | | | SPACE TO CONFIRM THAT IT IS A MECHANICAL ROOM NOT | | | INCLUDED WITHIN GBA. STAIR AT NW CORNER ONLY SERVING | | | GARAGE MAY BE EXCLUDED FROM GBA, BUT IT SHALL NOT BE | | | COUNTED AS ACTIVE USE ALONG BANYAN EITHER. | | | [SATISFIED] PER OUR DISCUSSION, THE BACK OF HOUSE | | | ?SERVICE CORRIDOR? AND ?PARKING LOBBY? WALLS SHALL BE | | | REMOVED AND OPEN TO THE GARAGE (NOT UNDER AC), SPACE | | | LABELED AS CAF? SUPPORT SHALL ALSO BE OPENED UP TO THE | | | GARAGE (MAY BE FENCED IN FOR STORAGE PURPOSES). PLEASE | | | LIST THE MECHANICAL SPACES TO BE LOCATED WITHIN THE | | | MEZZANINE. | | | 26. EXPLAIN THE ELEVATORS NOT COUNTED AS FAR; PARKING | | | ELEVATORS? SERVICE ELEVATORS ONLY? WHAT IS WITHIN THE | | | SERVICE ROOMS? | | | [SATISFIED] | | | | | | ADDITIONAL COMMENTS: | | | 27. SOME DRAWINGS STILL SHOW THE PORTE-COCHERE? PLEASE | | | UPDATE AND VERIFY INFORMATION ACROSS DRAWINGS IS | | | CONSISTENT. | | | [SATISFIED] | | | 28. RENDERINGS SHOW PLANTERS ALONG OLIVE NEXT TO PATIO | | | AREA BUT LANDSCAPE PLANS DO NOT SHOW ANY. GROUND FLOOR | | | PLANTERS DELINEATING PUBLIC WALKWAY AND RESTAURANT | | | TERRACE NEEDS FURTHER DISCUSSION. | | | [SATISFIED] | | | 29. CONTEXTUAL RENDERINGS AND SCHEMATIC DRAWINGS ARE | | | NOT UPDATED OR CONSISTENT WITH ONE ANOTHER AND THE | | | CURRENT PROPOSAL. | | | [SATISFIED] | | | 30. MICRO-MOBILITY STATION SHOULD BE IN PUBLIC | | | ROW/VISIBLE AS OPPOSED TO IN ALLEY. | | | [SATISFIED] | | | 31. IF POWER LINES ALONG THE ALLEY ARE GOING TO BE | | | BURIED, PLEASE IDENTIFY THE LOCATION OF THE REQUIRED | | | TRANSFORMERS. | | | [NOT SATISFIED] DISCUSSION ONGOING | | | 32. PLEASE INCLUDE REFERENCE PHOTOS OF SPECIAL | | | MATERIALS USED IN ELEVATIONS TO BETTER EXPLAIN THE | | | FACADE TREATMENT. | | | [SATISFIED] | | | | | | NEW COMMENTS 11/18/21: | | | 33. RENDERINGS: | | | A. ACCURATELY REFLECT LANDSCAPE PLANS WITH TREES AND | | | VEGETATION | | | B. OLIVE AVE. ALONG 301 CLEMATIS DOES NOT HAVE SIDEWALK | | | WIDTH OR SPACE FOR TABLES AND POTTED PLANTS, NEEDS TO | | | BE SHOWN WITH ACCURATE SIDEWALK DIMENSION. | | | C. R-3 RENDERING NOT ACCURATE ? MISSING TREES ALONG | | | STREET. SHOWS LANDSCAPE ON COLUMN AND BACK OF OPEN | | | SPACE THAT IS NOT DEPICTED WITHIN THE LANDSCAPE | | | DRAWINGS. | | | D. R-4 SHOWS PLANTING NEXT TO BIKES ON BANYAN BUT NOT | | | IN THE LANDSCAPE DRAWINGS | | | E. WEST ELEVATION RENDERING ?PUNCH-OUT? WINDOWS ON | | | FA?ADE SHALL REFLECT THE CORRECT DEPTH OF THE OPENINGS. | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
10-20-2021 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
10-20-2021 |
Time |
08:30 |
Rev Time |
0.00 |
| Received By |
ckimmerl |
Date |
09-24-2021 |
Time |
18:37 |
Sent To |
|
|
| Notes |
| 2021-10-20 08:30:06 | SETBACKS | | | 1. PROJECT DOES NOT COMPLY WITH TABLE IV-50 BUILDING | | | REQUIREMENTS? CWD 10-12. BUILDING IS ENCROACHING INTO | | | THE MINIMUM SETBACK (16?) ON LEVELS 3 AND ABOVE ALONG | | | OLIVE STREET, PLEASE ADJUST. | | | [NOT SATISFIED] | | | - BANYAN BOULEVARD 16? SETBACK NOT MET, APPEARS TO BE | | | 14? IN DRAWINGS. | | | - PLEASE CLEARLY INDICATE SETBACK LINE IN ALL FLOOR | | | PLANS, ELEVATIONS, AND SECTIONS TO CONFIRM COMPLIANCE. | | | | | | OPEN SPACE | | | 2. PLEASE PROVIDE INFORMATION ON PRIVATE OPEN SPACE | | | (SEC. 94-109 TABLE IV-7), SPECIFYING THE AMOUNT, | | | LOCATION, AND TYPE OF SPACE. CONFIRM COMPLIANCE WITH | | | STANDARDS LOCATED IN TABLE FOR EACH TYPE OF SPACE. | | | [PARTIALLY SATISFIED] | | | - PLEASE UPDATE TABLE IN SHEET L4 ? TO REFLECT THAT THE | | | PRIVATE OPEN SPACE IS CALCULATED FOR THE TWO SITES | | | | | | 3. PLEASE EXPLAIN WHAT THE OPEN SPACE/ACTIVE USE ALONG | | | THE GROUND LEVEL OF NORTHERN FACADE ON BANYAN IS. | | | [SATISFIED] | | | | | | ACTIVE USE | | | 4. PROPOSED PROJECT IS NOT IN COMPLIANCE WITH MINIMUM | | | GROUND ACTIVE USES (65%) ALONG PRIMARY PEDESTRIAN | | | STREETS (OLIVE AND BANYAN). SEE TABLE IV-50 BUILDING | | | REQUIREMENTS? CWD 10-12 | | | [NOT SATISFIED] | | | - MINOR TEXT ERROR, BOTH BANYAN AND OLIVE ARE PRIMARY | | | PEDESTRIAN STREETS IN THIS AREA (SHEET A-1 REFERS TO | | | OLIVE AS AN AVENUE). | | | - WILL REQUIRE VARIANCE FOR GROUND LEVEL ACTIVE USE | | | REQUIREMENT ALONG OLIVE; REQUIRED 80% OF FRONTAGE; | | | PROVIDED 62% (VARIANCE OF 18% OR 48.75? DIFFERENCE) | | | - WILL REQUIRE VARIANCE FOR GROUND LEVEL ACTIVE USE | | | REQUIREMENT ALONG BANYAN; REQUIRED 65% OF FRONTAGE; | | | PROVIDED 46% (VARIANCE OF 19% OR 30.92? DIFFERENCE) | | | - PLEASE INCLUDE GRAPHIC CALCULATIONS FOR THE ACTIVE | | | USE REQUIREMENTS INDICATING IN THE FLOOR PLAN WHAT IS | | | BEING COUNTED AND THE RESULTING PERCENTAGES. PLEASE | | | REVISE THE CALCULATED FRONTAGES AND PERCENTAGES OF | | | ACTIVE USE BASED ON THE BUILDABLE LOT FRONTAGE. | | | | | | 5. PROPOSED PROJECT IS NOT IN COMPLIANCE WITH MINIMUM | | | LINER ACTIVE USES [2 TO 3 STORIES (44?)] WHICH REQUIRES | | | 60%. | | | [NOT SATISFIED] | | | - WILL REQUIRE VARIANCE FOR 2ND AND 3RD STORY ACTIVE | | | USE LINER REQUIREMENT ALONG OLIVE AVE AND BANYAN BLVD; | | | REQUIRED 60%; PROVIDED 0% (VARIANCE OF 60%) | | | - THE 1ST STORY IS A DOUBLE HEIGHT AND IT WILL BE | | | COUNTED AS ONE LEVEL. | | | - THE ADDITIONAL ENHANCED TREATMENT OF NORTH FA?ADE | | | PREVIOUSLY DISCUSSED WAS NOT INCLUDED IN THE SUBMITTED | | | DRAWINGS. | | | | | | STREETSCAPE | | | 6. STREETSCAPE REQUIREMENTS ARTICLE IV: SEC. 94-113, | | | PROPOSED PROJECT AND PLANS SHOULD REFLECT/COORDINATE | | | WITH THE CITY?S PROPOSED STREETSCAPE IMPROVEMENTS ALONG | | | BANYAN BOULEVARD. | | | [NOT SATISFIED] | | | - ONGOING COORDINATION IS STILL NEEDED. | | | | | | 7. CITY WOULD LIKE TO DISCUSS WIDENING THE SIDEWALK IN | | | FRONT OF HISTORIC BUILDING (301 CLEMATIS) TO ALLOW FOR | | | LANDSCAPING ALONG OLIVE. | | | [NOT SATISFIED] | | | - DISCUSSIONS ONGOING, DETAILS AND ACTIONS TO BE | | | DETERMINED. | | | | | | 8. STREET TREES SHALL BE PLANTED ALONG OLIVE FRONTAGE | | | ADJACENT TO THE CURB AT A MAXIMUM OF 30 FEET ON CENTER. | | | TREES SHALL BE A MINIMUM OF 20 FEET IN HEIGHT, AND HAVE | | | A MINIMUM OF EIGHT FEET CLEAR TRUNK, OR AS APPROVED BY | | | THE CITY. STRUCTURAL SOIL SHALL BE INSTALLED MEETING | | | THE CITY APPROVED STANDARDS AS A MINIMUM REQUIREMENT | | | UNDER ADJACENT PAVED AREAS, OR SUSPENDED PAVEMENT SOIL | | | CELL SYSTEMS MAY BE INSTALLED AS AN ALTERNATIVE. | | | [PARTIALLY SATISFIED] | | | - STAFF RECOMMENDS REDUCING THE DROP-OFF ON OLIVE AVE. | | | TO 10? IN WIDTH. FURTHER DISCUSSION NEEDED WITH TRAFFIC | | | ENGINEER. | | | | | | BIKES, PARKING, & LOADING | | | 9. AS PER ARTICLE IV: SEC. 94-111, BICYCLE PARKING MUST | | | INCLUDE: | | | A) (I) SECURE BIKE RACKS AND/OR STORAGE AT A RATIO OF | | | ONE BICYCLE PARKING SPACE PER EVERY 15 PARKING SPACES | | | PROVIDED | | | B) (II) A MINIMUM OF ONE SHOWER AND CHANGING FACILITY | | | SHALL BE PROVIDED TO BE AVAILABLE FOR ALL TENANTS AND | | | SHALL BE LOCATED WITHIN THE BUILDING, OR WITHIN 200 | | | FEET OF THE BUILDING ENTRANCE, FOR DEVELOPMENTS GREATER | | | THAN 50,000 SQUARE FEET IN GROSS BUILDING AREA. | | | C) ADDITIONALLY, 1 SPACE PER 100 FT. OF STREET | | | FRONTAGE; TO BE LOCATED ALONG ROW OR STREET FRONTAGES | | | FOR PUBLIC ACCESS. | | | D) PLEASE INDICATE THE LOCATION OF SHOWER FACILITIES | | | [SATISFIED] | | | - DISTRIBUTE PUBLIC BIKE PARKING SPACES | | | ALONG/THROUGHOUT THE FRONTAGE. | | | | | | 10. AS PER SUBSECTION 94-485(P), PROPOSED PROJECT NOT | | | IN COMPLIANCE WITH REQUIRED LOADING STANDARDS | | | A) REQUIRES 2 (10?X50?) FOR COMMERCIAL USES; PROPOSED | | | PLAN WILL REQUIRE A VARIANCE. | | | [SATISFIED] | | | | | | 11. PLEASE PROVIDE AN AUTOTURN STUDY AND SERVICE PLAN. | | | [SATISFIED] | | | | | | 12. STAFF DOES NOT SUPPORT LOCATION OF PORTE COCHERE | | | DROP-OFF ALONG OLIVE. | | | A) MAY SUPPORT ALTERNATIVE ON-STREET DROP-OFF. | | | [PARTIALLY SATISFIED] | | | - SHEET A-1 APPEARS TO SHOW OLD DROP-OFF WITH | | | PEDESTRIAN ISLAND AND TERRACE SEATING IN DROP-OFF ROW, | | | AS OPPOSED TO NEW DROP-OFF CONFIGURATION SHOWN IN | | | LANDSCAPE SHEETS. | | | - STAFF RECOMMENDS TO REDUCE DROP-OFF WIDTH TO 10? ? | | | TALK WITH VALERIO (TRAFFIC ENGINEER) | | | | | | 13. PLEASE INCLUDE TABLE OF PARKING REQUIREMENTS. | | | [SATISFIED] | | | | | | 14. PLEASE DIMENSION ALL DRIVE AISLE AND PARKING | | | SPACES. | | | [SATISFIED] | | | | | | FACADE ARTICULATION | | | 15. WEST ELEVATION OF PROPOSED BUILDING HAS THE FIRST 7 | | | FLOORS AS A BLANK WALL. DOES NOT COMPLY WITH CODE SEC. | | | 94-109 TABLE IV-4. BLANK WALLS ARE NOT PERMITTED, AND | | | EXCEEDS 20% OF THE WESTERN FACADE. REQUIRES | | | FENESTRATION OR ARCHITECTURAL TREATMENTS. | | | [NOT SATISFIED] | | | - B-21 HAS UPDATED ELEVATION (NOT B-18 AS RESPONSE | | | INDICATES) | | | - WEST ELEVATION DRAWINGS INCLUDE A BLANK WALL NOT | | | PERMITTED BY CODE. GARAGE FA?ADE IS MORE THAN 20% OF | | | OVERALL. | | | | | | 16. ADDITIONAL ARCHITECTURAL TREATMENT SHALL BE | | | PROVIDED TO SCREEN PARKING USES. | | | [NOT SATISFIED] | | | - WITHIN THE SUBMITTED DRAWINGS NOT SEEING THE | | | ALTERNATE SCREENING AND FA?ADE/ARCHITECTURAL TREATMENTS | | | DISCUSSED IN MEETINGS, DID PLANS REVERT TO PREVIOUS | | | DESIGN? | | | - PLEASE EXPLAIN HOW IS THE PROJECT COMPLYING WITH THE | | | PLANAR BREAK REQUIREMENTS. | | | | | | 17. SOME ADDITIONAL ARCHITECTURAL TREATMENTS ON PORTION | | | OF ALLEY (SOUTHERN FACADE) WOULD BE PREFERRED AS IT | | | DOESN?T HAVE FENESTRATION. | | | [SATISFIED] | | | - OKAY WITH ALLEYWAY/NO CHANGE IN SOUTHERN GROUND-FLOOR | | | FA?ADE. | | | - ALLEYWAY RENDERINGS SHOW A CANOPY NOT ILLUSTRATED OR | | | SHOWN IN DRAWINGS, PLEASE PROVIDE MORE DETAILS IN | | | DRAWINGS. | | | | | | GENERAL SITE | | | 18. CITY CURRENTLY HAS A TRASH COMPACTOR ON SITE. | | | FURTHER DISCUSSIONS NECESSARY TO EXPLORE OPTION TO KEEP | | | COMPACTOR ON SITE. | | | [PARTIALLY SATISFIED] | | | - DISCUSSIONS ONGOING, DETAILS AND ACTIONS TO BE | | | DETERMINED. | | | - SPEAK WITH VINCE (SURVEY) | | | | | | 19. FURTHER DISCUSSION NEEDED TO DETERMINE IF ALLEYWAY | | | NEEDS TO BE ONE-WAY. | | | [PARTIALLY SATISFIED] | | | - DISCUSSIONS ONGOING, DETAILS AND ACTIONS TO BE | | | DETERMINED. | | | - SPEAK WITH VALERIO (TRAFFIC ENGINEER) EAST-WAY | | | TRAFFIC FLOW MAY BE NEEDED FOR VALET OPERATIONS. | | | EXPLORE OPENING IN GARAGE ON SOUTHWESTERN CORNER? | | | | | | 20. PLEASE IDENTIFY IF THERE ARE ANY HARDSCAPE | | | IMPROVEMENTS PROPOSED TO THE ALLEYWAY. | | | [PARTIALLY SATISFIED] | | | - FURTHER DISCUSSIONS NECESSARY TO CONFIRM THE PROPOSED | | | IMPROVEMENTS ON THE CITY-OWNED ALLEY ARE VIABLE. | | | | | | 21. PLEASE EXPLORE HOW THE DESIGN OF PROPOSED BUILDING | | | CAN BETTER RELATE TO THE HISTORIC BUILDING. | | | A) SCALE COMPATIBILITY WITH HISTORIC BUILDING, HISTORIC | | | TREATMENTS, ETC. | | | [SATISFIED] | | | - HPB APPROVED | | | | | | 22. PROVIDE SITE TABLE WITH: | | | A) SITE AREA | | | B) GROSS BUILDING AREA ALLOWED | | | C) GROSS BUILDING AREA PROPOSED | | | D) TDR?S NEEDED FOR PROJECT | | | [PARTIALLY SATISFIED] | | | - PLEASE UPDATE TABLE TO INCLUDE SEPARATED INFORMATION | | | FOR 301 CLEMATIS AND 300 BANYAN, THEN COMBINED TOTALS. | | | | | | 23. PLEASE LABEL WHAT THE USES ARE THAT ARE COUNTED AND | | | THOSE USES EXCLUDED FROM THE GROSS BUILDING AREA | | | CALCULATIONS. | | | [NOT SATISFIED] | | | - GROUND FLOOR CORRIDORS AND ENCLOSED STORAGE AREAS, | | | ELEVATORS, AND STAIRS NEED TO BE INCLUDED. LABEL EACH | | | SPACE TO CONFIRM THAT IT IS A MECHANICAL ROOM NOT | | | INCLUDED WITHIN GBA. | | | - STAIR AT NW CORNER ONLY SERVING GARAGE MAY BE | | | EXCLUDED FROM GBA, BUT IT SHALL NOT BE COUNTED AS | | | ACTIVE USE ALONG BANYAN EITHER. | | | - EXPLAIN THE ELEVATORS NOT COUNTED AS FAR; PARKING | | | ELEVATORS? SERVICE ELEVATORS ONLY? WHAT IS WITHIN THE | | | SERVICE ROOMS? | | | | | | 24. PLEASE CONFIRM THAT GROSS BUILDING AREA | | | CALCULATIONS ARE MEASURED FROM THE EXTERIOR WALL. | | | [SATISFIED] | | | | | | 25. PLEASE IDENTIFY LOCATION OF GAS METERS AND ANY | | | OTHER ABOVE GROUND UTILITY CONNECTIONS. | | | A) FIRE DEPT. CONNECTION ON BANYAN SHALL BE | | | WALL-MOUNTED. | | | [SATISFIED] | | | | | | 26. OPEN GROUND FLOOR AREAS EXCEED THE MAX PERMITTED | | | GROUND FLOOR SETBACK. | | | [SATISFIED] | | | | | | ADDITIONAL COMMENTS BASED ON RESUBMISSION: | | | 27. SOME DRAWINGS STILL SHOW THE PORTE-COCHERE ? PLEASE | | | UPDATE AND VERIFY INFORMATION ACROSS DRAWINGS IS | | | CONSISTENT. | | | 28. RENDERINGS SHOW PLANTERS ALONG OLIVE NEXT TO PATIO | | | AREA BUT LANDSCAPE PLANS DO NOT SHOW ANY. GROUND FLOOR | | | PLANTERS DELINEATING PUBLIC WALKWAY AND RESTAURANT | | | TERRACE NEEDS FURTHER DISCUSSION. | | | 29. CONTEXTUAL RENDERINGS AND SCHEMATIC DRAWINGS ARE | | | NOT UPDATED OR CONSISTENT WITH ONE ANOTHER AND THE | | | CURRENT PROPOSAL. | | | 30. MICRO-MOBILITY STATION SHOULD BE IN PUBLIC | | | ROW/VISIBLE AS OPPOSED TO IN ALLEY. | | | 31. IF POWER LINES ALONG THE ALLEY ARE GOING TO BE | | | BURIED, PLEASE IDENTIFY THE LOCATION OF THE REQUIRED | | | TRANSFORMERS. | | | 32. PLEASE INCLUDE REFERENCE PHOTOS OF SPECIAL | | | MATERIALS USED IN ELEVATIONS TO BETTER EXPLAIN THE | | | FA?ADE TREATMENT. | | | FOR RESUBMITTAL, PLEASE INCLUDE A RESPONSE LETTER, ONE | | | FULL SET COPY (COLORED) AND A CD WITH A DIGITAL COPY. | | | COMMENTS DO NOT INCLUDE A REVIEW OF RENDERINGS E-MAILED | | | TO STAFF ON 10/15/21. | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
08-12-2021 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
08-12-2021 |
Time |
10:47 |
Rev Time |
0.00 |
| Received By |
ckimmerl |
Date |
08-12-2021 |
Time |
10:45 |
Sent To |
|
|
| Notes |
| 2021-08-12 10:47:28 | SETBACKS | | | 1. PROJECT DOES NOT COMPLY WITH TABLE IV-50 BUILDING | | | REQUIREMENTS ? CWD 10-12. BUILDING IS ENCROACHING INTO | | | THE MINIMUM SETBACK (16?) ON LEVELS 3 AND ABOVE ALONG | | | OLIVE STREET, PLEASE ADJUST. | | | | | | OPEN SPACE | | | 2. PLEASE PROVIDE INFORMATION ON PRIVATE OPEN SPACE | | | (SEC. 94-109 TABLE IV-7), SPECIFYING THE AMOUNT, | | | LOCATION, AND TYPE OF SPACE. CONFIRM COMPLIANCE WITH | | | STANDARDS LOCATED IN TABLE FOR EACH TYPE OF SPACE. | | | 3. PLEASE EXPLAIN WHAT THE OPEN SPACE/ACTIVE USE ALONG | | | THE GROUND LEVEL OF NORTHERN FA?ADE ON BANYAN IS. | | | | | | ACTIVE USE | | | 4. PROPOSED PROJECT IS NOT IN COMPLIANCE WITH MINIMUM | | | GROUND ACTIVE USES (65%) ALONG PRIMARY PEDESTRIAN | | | STREETS (OLIVE AND BANYAN). SEE TABLE IV-50 BUILDING | | | REQUIREMENTS ? CWD 10-12 | | | 5. PROPOSED PROJECT IS NOT IN COMPLIANCE WITH MINIMUM | | | LINER ACTIVE USES [2 TO 3 STORIES (44?)] WHICH REQUIRES | | | 60%. | | | | | | STREETSCAPE | | | 6. STREETSCAPE REQUIREMENTS ARTICLE IV: SEC. 94-113, | | | PROPOSED PROJECT AND PLANS SHOULD REFLECT/COORDINATE | | | WITH THE CITY?S PROPOSED STREETSCAPE IMPROVEMENTS ALONG | | | BAYAN BOULEVARD. | | | 7. CITY WOULD LIKE TO DISCUSS WIDENING THE SIDEWALK IN | | | FRONT OF HISTORIC BUILDING (301 CLEMATIS) TO ALLOW FOR | | | LANDSCAPING ALONG OLIVE. | | | 8. STREET TREES SHALL BE PLANTED ALONG OLIVE FRONTAGE | | | ADJACENT TO THE CURB AT A MAXIMUM OF 30 FEET ON CENTER. | | | TEES SHALL BE A MINIMUM OF 20 FEET IN HEIGHT, AND HAVE | | | A MINIMUM OF EIGHT FEET CLEAR TRUNK, OR AS APPROVED BY | | | THE CITY. STRUCTURAL SOIL SHALL BE INSTALLED MEETING | | | THE CITY APPROVED STANDARDS AS A MINIMUM REQUIREMENT | | | UNDER ADJACENT PAVED AREAS, OR SUSPENDED PAVEMENT SOIL | | | CELL SYSTEMS MAY BE INSTALLED AS AN ALTERNATIVE. | | | | | | BIKES, PARKING, & LOADING | | | 9. AS PER ARTICLE IV: SEC. 94-111, BICYCLE PARKING MUST | | | INCLUDE: | | | A) (I) SECURE BIKE RACKS AND/OR STORAGE AT A RATIO OF | | | ONE BICYCLE PARKING SPACE PER EVERY 15 PARKING SPACES | | | PROVIDED | | | B) (II) A MINIMUM OF ONE SHOWER AND CHANGING FACILITY | | | SHALL BE PROVIDED TO BE AVAILABLE FOR ALL TENANTS AND | | | SHALL BE LOCATED WITHIN THE BUILDING, OR WITHIN 200 | | | FEET OF THE BUILDING ENTRANCE, FOR DEVELOPMENTS GREATER | | | THAN 50,000 SQUARE FEET IN GROSS BUILDING AREA. | | | C) ADDITIONALLY, 1 SPACE PER 100 FT. OF STREET | | | FRONTAGE; TO BE LOCATED ALONG ROW OR STREET FRONTAGES | | | FOR PUBLIC ACCESS. | | | D) PLEASE INDICATE THE LOCATION OF SHOWER FACILITIES | | | 10. AS PER SUBSECTION 94-485(P), PROPOSED PROJECT NOT | | | IN COMPLIANCE WITH REQUIRED LOADING STANDARDS | | | A) REQUIRES 2 (10?X50?) FOR COMMERCIAL USES; PROPOSED | | | PLAN WILL REQUIRE A VARIANCE | | | 11. PLEASE PROVIDE AN AUTOTURN STUDY AND SERVICE PLAN | | | 12. STAFF DOES NOT SUPPORT LOCATION OF PORTE COCHERE | | | DROP-OFF ALONG OLIVE. | | | A) MAY SUPPORT ALTERNATIVE ON-STREET DROP-OFF. | | | 13. PLEASE INCLUDE TABLE OF PARKING REQUIREMENTS. | | | 14. PLEASE DIMENSION ALL DRIVE AISLE AND PARKING | | | SPACES. | | | | | | FACADE ARTICULATION | | | 15. WEST ELEVATION OF PROPOSED BUILDING HAS THE FIRST 7 | | | FLOORS AS A BLANK WALL. DOES NOT COMPLY WITH CODE SEC. | | | 94-109 TABLE IV-4. BLANK WALLS ARE NOT PERMITTED, AND | | | EXCEEDS 20% OF THE WESTERN FA?ADE. REQUIRES | | | FENESTRATION OR ARCHITECTURAL TREATMENTS. | | | 16. ADDITIONAL ARCHITECTURAL TREATMENT SHALL BE | | | PROVIDED TO SCREEN PARKING USES. | | | 17. SOME ADDITIONAL ARCHITECTURAL TREATMENTS ON PORTION | | | OF ALLEY (SOUTHERN FA?ADE) WOULD BE PREFERRED AS IT | | | DOESN?T HAVE FENESTRATION. | | | | | | GENERAL SITE | | | 18. CITY CURRENTLY HAS A TRASH COMPACTOR ON SITE. | | | FURTHER DISCUSSIONS NECESSARY TO EXPLORE OPTION TO KEEP | | | COMPACTOR ON SITE. | | | 19. FURTHER DISCUSSION NEEDED TO DETERMINE IF ALLEYWAY | | | NEEDS TO BE ONE-WAY. | | | 20. PLEASE IDENTIFY IF THERE ARE ANY HARDSCAPE | | | IMPROVEMENTS PROPOSED TO THE ALLEYWAY. | | | 21. PLEASE EXPLORE HOW THE DESIGN OF PROPOSED BUILDING | | | CAN BETTER RELATE TO THE HISTORIC BUILDING. | | | A) SCALE COMPATIBILITY WITH HISTORIC BUILDING, HISTORIC | | | TREATMENTS, ETC. | | | 22. PROVIDE SITE TABLE WITH: | | | A) SITE AREA | | | B) GROSS BUILDING AREA ALLOWED | | | C) GROSS BUILDING AREA PROPOSED | | | D) TDRS NEEDED FOR PROJECT | | | 23. PLEASE LABEL WHAT THE USES ARE THAT ARE COUNTED AND | | | THOSE USES EXCLUDED FROM THE GROSS BUILDING AREA | | | CALCULATIONS. | | | 24. PLEASE CONFIRM THAT GROSS BUILDING AREA | | | CALCULATIONS ARE MEASURED FROM THE EXTERIOR WALL. | | | 25. PLEASE IDENTIFY LOCATION OF GAS METERS AND ANY | | | OTHER ABOVE GROUND UTILITY CONNECTIONS. | | | A) FIRE DEPT. CONNECTION ON BANYAN SHALL BE | | | WALL-MOUNTED. | | | 26. OPEN GROUND FLOOR AREAS EXCEED THE MAX PERMITTED | | | GROUND FLOOR SETBACK. | | | |
|
|
| |
Print |
|