Plan Review Details - Project Z21050015
| Plan Review Stops For Project Z21050015 |
| Review Stop |
AIPP |
ART IN PUBLIC PLACES |
| Rev No |
3 |
Status |
P |
Date |
09-20-2021 |
|
|
Cont ID |
|
| Sent By |
scwelter |
Date |
09-20-2021 |
Time |
15:28 |
Rev Time |
0.00 |
| Received By |
scwelter |
Date |
09-20-2021 |
Time |
15:32 |
Sent To |
|
|
| Notes |
| 2021-09-20 15:32:06 | PUBLIC ART - POSSIBLE SITES IDENTIFIED ON SITE PLAN - | | | FINAL PLACEMENT TO BE DETERMINED. | | | | | | A COMPLETED ART ASSESSMENT APPLICATION AND EVIDENCE OF | | | ESCROW ARE DUE AT TIME OF BUILDING PERMIT. |
|
|
| Review Stop |
AIPP |
ART IN PUBLIC PLACES |
| Rev No |
2 |
Status |
F |
Date |
06-10-2021 |
|
|
Cont ID |
|
| Sent By |
scwelter |
Date |
06-10-2021 |
Time |
10:03 |
Rev Time |
0.00 |
| Received By |
scwelter |
Date |
06-10-2021 |
Time |
11:38 |
Sent To |
|
|
| Notes |
| 2021-06-10 10:04:39 | PUBLIC ART REQUIREMENT: | | | IF TOTAL CONSTRUCTION COSTS OF THIS DEVELOPMENT ARE | | | OVER $500,000 IT WILL BE SUBJECT TO THE PUBLIC ART | | | REQUIREMENT AS PER CITY ORDINANCE. | | | SECTION 78-129: ALL PRIVATE DEVELOPMENT PROJECTS, | | | INCLUDING NEW CONSTRUCTION, OR THE RENOVATION OR | | | IMPROVEMENT OF AN EXISTING BUILDING, WHERE TOTAL | | | CONSTRUCTION COSTS ARE EQUAL TO OR GREATER THAN | | | $500,000 ARE SUBJECT TO THE PUBLIC ART REQUIREMENT. | | | OPTION 1: INSTALL ARTWORK ON THE DEVELOPMENT SITE | | | VALUED IN AN AMOUNT NOT LESS THAN ONE PERCENT OF THE | | | TOTAL CONSTRUCTION COSTS; OR | | | OPTION 2: CONTRIBUTE AN AMOUNT EQUAL TO 75 PERCENT OF | | | ONE PERCENT OF THE TOTAL CONSTRUCTION COSTS FOR DEPOSIT | | | TO THE PUBLIC ART ACCOUNT. | | | A COMPLETED PUBLIC ART ASSESSMENT APPLICATION IS | | | REQUIRED AT TIME OF BUILDING PERMIT SUBMITTAL. | | | | | | PLEASE CONTACT SYBILLE WELTER AT [email protected] OR | | | 561.822.1521 TO OBTAIN AN APPLICATION AND REVIEW THE | | | REQUIREMENTS. | | | |
|
|
| Review Stop |
AIPP |
ART IN PUBLIC PLACES |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
09-28-2021 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
09-28-2021 |
Time |
18:57 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
09-28-2021 |
Time |
18:57 |
Sent To |
|
|
| Notes |
| 2021-09-28 19:10:43 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. DEMOLITION OF THE EXISTING BUILDING. AN ASBESTOS | | | SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT | | | REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH | | | COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963, | | | OR BY EMAIL: [email protected] | | | | | | 3. FLOOD ZONE. PROVISO/CONDITION: AS STATED IN THEIR | | | PPRC RESPONSE LETTER DATED 9/13/2021 THE DESIGN TEAM | | | HAS ADVISED THAT IT WILL SEEK ISSUANCE OF A LETTER OF | | | MAP REVISION BASED ON FILL LOMR-F BY FEMA IN ORDER TO | | | ADDRESS THE COMMENT REGARDING THE PROPOSED FINISHED | | | FLOOR LEVEL BEING EL 9.0 FT NAVD INSTEAD OF THE EL 10.0 | | | FT NAVD THAT WOULD BE REQUIRED TO MEET THE BASE FLOOD | | | ELEVATION PLUS 2.0 FT FREEBOARD. CONDITION: EITHER THE | | | LOMR-F MUST BE SUBMITTED TO THE BUILDING DIVISION PRIOR | | | TO BUILDING PERMIT ISSUANCE, OR THE FINISHED FLOOR | | | LEVEL BEING RAISED TO EL 10.0 FT NAVD. | | | | | | 4. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 5. ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE DOES | | | NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL OPENINGS TO | | | MEET THE DEFINITION OF AN OPEN PARKING GARAGE, IT WILL | | | BE CONSIDERED AN ENCLOSED PARKING GARAGE AND MUST HAVE | | | EXHAUST SYSTEMS. THE EXHAUST SYSTEMS SHALL BE DESIGNED | | | TO MINIMIZE NOISE LEVELS USING INLINE FAN SILENCERS OR | | | OTHER APPROVED METHODS. | | | | | | 6. GREASE INTERCEPTOR. A GREASE INTERCEPTOR WILL BE | | | REQUIRED. FOR INFORMATION ON THE REQUIRED TYPE, SIZE | | | AND LOCATION, PLEASE CONTACT TIM LARGE, CHIEF PLUMBING | | | INSPECTOR, DEVELOPMENT SERVICES DEPARTMENT, AT (561) | | | 805-6692, OR BY EMAIL: [email protected] | | | | | | 7. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS, | | | GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND | | | OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS, | | | SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC. | | | | | | 8. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND | | | CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF | | | CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL | | | NEIGHBORING PROPERTIES. | | | | | | 9. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER | | | AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY, | | | INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE | | | CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF | | | NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION | | | THAT MAY AFFECT THE USE OF THEIR PROPERTY. | | | | | | 10. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT | | | WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL | | | HAVE A SEPARATE ADDRESS ASSIGNED BASED ON THE LOCATION | | | OF THE BUILDING ENTRANCE. FOR STREET ADDRESSING, | | | CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT | | | (561) 805 6659, OR BY EMAIL: [email protected] | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
09-02-2021 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
09-02-2021 |
Time |
20:24 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
09-02-2021 |
Time |
20:24 |
Sent To |
|
|
| Notes |
| 2021-09-02 20:56:47 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. DEMOLITION OF THE EXISTING BUILDING. AN ASBESTOS | | | SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT | | | REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH | | | COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963, | | | OR BY EMAIL: [email protected] | | | | | | 3. FLOOD ZONE. SHEET C-500, PAVING, GRADING AND | | | DRAINAGE PLAN SHOWS THE TOWNHOME FINISHED FLOOR | | | ELEVATION (INCLUDING TOWNHOUSE -1 L1) TO BE AT EL 9.00 | | | NAVD. THE CITY HAS SUBMITTED AN APPEAL TO FEMA AGAINST | | | THE METHODOLOGY USED BY FEMA TO ARRIVE AT THE FLOOD | | | ELEVATIONS IN THE LATEST FLOOD INSURANCE RATE MAPS | | | (FIRMS), BUT THE DISPOSITION OF THE APPEAL IS UNKNOWN | | | AT THIS TIME. THEREFORE ACCORDING TO THE FLOOD | | | INSURANCE RATE MAPS, THE PROPOSED BUILDING IS IN FLOOD | | | ZONE AE WITH A BASE FLOOD ELEVATION OF 8 FT NAVD. THE | | | FIRST FLOOR OF THE BUILDING AND ALL ASSOCIATED | | | MECHANICAL EQUIPMENT (CHILLERS, GENERATORS ETC.) SHALL | | | BE 24 INCHES (FREEBOARD) ABOVE THE BASE FLOOD | | | ELEVATION, AND THAT IS EL 10.00 FT NAVD SO THE FINISHED | | | FLOOR ELEVATION MUST BE RAISED TO THAT ELEVATION. ALSO | | | THE ENTRANCE DOOR THRESHOLD TO TOWNHOUSE -1 L1 IS | | | CURRENTLY SHOWN TO BE LOWER THAN THE ADJACENT SIDEWALK | | | LEVEL WHICH IS APPROXIMATELY EL 11 FT NAVD. THERE IS A | | | RELATIVELY SMALL AREA OF EXTERIOR GRADES AT | | | APPROXIMATELY EL 8.8 FT NAVD (SWALE) BETWEEN THAT | | | SIDEWALK AND THE DOOR THRESHOLD SO THE TOWNHOME COULD | | | POTENTIALLY BE FLOODED DURING A STORM. | | | | | | 4. LOCATION OF ACCESSIBLE PARKING SPACES. THE PARKING | | | DATA TABLE ON SHEET A-100, BASEMENT LEVEL 00 FLOOR PLAN | | | SHOWS THAT 41 PARKING SPACES ARE DEDICATED TO THE CAFE. | | | THEREFORE 2 ACCESSIBLE PARKING SPACES MUST BE PROVIDED | | | AND THEY MUST BE THE CLOSEST PARKING SPACES TO THE CAFE | | | ENTRANCE. SHEET A-101, LEVEL 01 FLOOR PLAN, SHOWS 3 | | | ACCESSIBLE PARKING SPACES ON THAT LEVEL BUT ONLY 1 OF | | | THEM IS NEAR THE ENTRANCE TO THE CAFE AND IT IS NOT THE | | | CLOSEST PARKING SPACE TO THE ENTRANCE. PLEASE MAKE THE | | | 2 PARKING SPACES CLOSEST TO THE ENTRANCE OF THE CAFE, | | | ACCESSIBLE PARKING SPACES . PER SECTION 208.3 OF | | | FLORIDA ACCESSIBILITY CODE, ACCESSIBLE PARKING SPACES | | | ARE TO BE LOCATED ON THE SHORTEST POSSIBLE ROUTE OF | | | TRAVEL FROM ADJACENT PARKING TO AN ACCESSIBLE ENTRANCE. | | | THE DESIGN OF ACCESSIBLE PARKING SPACES SHALL COMPLY | | | WITH SECTION 502 OF FLORIDA ACCESSIBILITY CODE | | | | | | 5. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 6. ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE DOES | | | NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL OPENINGS TO | | | MEET THE DEFINITION OF AN OPEN PARKING GARAGE, IT WILL | | | BE CONSIDERED AN ENCLOSED PARKING GARAGE AND MUST HAVE | | | EXHAUST SYSTEMS. THE EXHAUST SYSTEMS SHALL BE DESIGNED | | | TO MINIMIZE NOISE LEVELS USING INLINE FAN SILENCERS OR | | | OTHER APPROVED METHODS. | | | | | | 7. GREASE INTERCEPTOR. A GREASE INTERCEPTOR WILL BE | | | REQUIRED. FOR INFORMATION ON THE REQUIRED TYPE, SIZE | | | AND LOCATION, PLEASE CONTACT TIM LARGE, CHIEF PLUMBING | | | INSPECTOR, DEVELOPMENT SERVICES DEPARTMENT, AT (561) | | | 805-6692, OR BY EMAIL: [email protected] | | | | | | 8. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS, | | | GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND | | | OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS, | | | SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC. | | | | | | 9. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND | | | CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF | | | CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL | | | NEIGHBORING PROPERTIES. | | | | | | 10. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER | | | AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY, | | | INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE | | | CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF | | | NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION | | | THAT MAY AFFECT THE USE OF THEIR PROPERTY. | | | | | | 11. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT | | | WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL | | | HAVE A SEPARATE ADDRESS ASSIGNED BASED ON THE LOCATION | | | OF THE BUILDING ENTRANCE. FOR STREET ADDRESSING, | | | CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT | | | (561) 805 6659, OR BY EMAIL: [email protected] | | | | | | 12. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT | | | TO ART IN PUBLIC PLACES (AIPP) ASSESSMENT. FOR ADVICE | | | ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP | | | ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC | | | PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL: | | | [email protected] | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
07-16-2021 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
07-16-2021 |
Time |
22:18 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
07-16-2021 |
Time |
22:18 |
Sent To |
|
|
| Notes |
| 2021-07-16 22:20:46 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. DEMOLITION OF THE EXISTING BUILDING. AN ASBESTOS | | | SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT | | | REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH | | | COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963, | | | OR BY EMAIL: [email protected] | | | | | | 3. FLOOD ZONE. ACCORDING TO THE ADOPTED FLOOD INSURANCE | | | RATE MAPS (FIRMS), THE PROPOSED BUILDING IS IN FLOOD | | | ZONE AE WITH A BASE FLOOD ELEVATION OF 6 FT NAVD. THE | | | FIRST FLOOR OF THE BUILDING AND ALL ASSOCIATED | | | MECHANICAL EQUIPMENT (CHILLERS, GENERATORS ETC.) SHALL | | | BE 24 INCHES (FREEBOARD) ABOVE THE BASE FLOOD | | | ELEVATION. | | | | | | 4. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 5. ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE DOES | | | NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL OPENINGS TO | | | MEET THE DEFINITION OF AN OPEN PARKING GARAGE, IT WILL | | | BE CONSIDERED AN ENCLOSED PARKING GARAGE AND MUST HAVE | | | EXHAUST SYSTEMS. THE EXHAUST SYSTEMS SHALL BE DESIGNED | | | TO MINIMIZE NOISE LEVELS USING INLINE FAN SILENCERS OR | | | OTHER APPROVED METHODS. | | | | | | 6. GREASE INTERCEPTOR. A GREASE INTERCEPTOR WILL BE | | | REQUIRED. FOR INFORMATION ON THE REQUIRED TYPE, SIZE | | | AND LOCATION, PLEASE CONTACT TIM LARGE, CHIEF PLUMBING | | | INSPECTOR, DEVELOPMENT SERVICES DEPARTMENT, AT (561) | | | 805-6692, OR BY EMAIL: [email protected] | | | | | | 7. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS, | | | GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND | | | OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS, | | | SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC. | | | | | | 8. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND | | | CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF | | | CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL | | | NEIGHBORING PROPERTIES. | | | | | | 9. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER | | | AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY, | | | INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE | | | CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF | | | NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION | | | THAT MAY AFFECT THE USE OF THEIR PROPERTY. | | | | | | 10. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT | | | WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL | | | HAVE A SEPARATE ADDRESS ASSIGNED BASED ON THE LOCATION | | | OF THE BUILDING ENTRANCE. FOR STREET ADDRESSING, | | | CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT | | | (561) 805 6659, OR BY EMAIL: [email protected] | | | | | | 11. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT | | | TO ART IN PUBLIC PLACES (AIPP) ASSESSMENT. FOR ADVICE | | | ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP | | | ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC | | | PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL: | | | [email protected] | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
06-09-2021 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
06-09-2021 |
Time |
20:56 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
06-09-2021 |
Time |
20:56 |
Sent To |
|
|
| Notes |
| 2021-06-09 21:04:58 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. DEMOLITION OF THE EXISTING BUILDING. AN ASBESTOS | | | SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT | | | REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH | | | COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963, | | | OR BY EMAIL: [email protected] | | | | | | 3. FLOOD ZONE. ACCORDING TO THE ADOPTED FLOOD INSURANCE | | | RATE MAPS (FIRMS), THE PROPOSED BUILDING IS IN FLOOD | | | ZONE AE WITH A BASE FLOOD ELEVATION OF 6 FT NAVD. THE | | | FIRST FLOOR OF THE BUILDING AND ALL ASSOCIATED | | | MECHANICAL EQUIPMENT (CHILLERS, GENERATORS ETC.) SHALL | | | BE 24 INCHES (FREEBOARD) ABOVE THE BASE FLOOD | | | ELEVATION. | | | | | | 4. NUMBER OF ACCESSIBLE PARKING SPACES. ONLY 4 | | | ACCESSIBLE PARKING SPACES ARE SHOWN (2 ON SHEET A-101 | | | AND 2 ON SHEET A-102). WITH 311 PARKING SPACES BEING | | | PROVIDED, 8 ACCESSIBLE PARKING SPACES ARE REQUIRED. THE | | | MINIMUM NUMBER OF ACCESSIBLE PARKING SPACES PROVIDED | | | SHALL BE IN ACCORDANCE WITH SECTION 208.2 OF FLORIDA | | | ACCESSIBILITY CODE. | | | | | | 5. VAN ACCESSIBLE PARKING SPACES. NONE OF THE | | | ACCESSIBLE PARKING SPACES ARE MARKED AS VAN ACCESSIBLE. | | | PER SECTION 208.2.4 OF FLORIDA ACCESSIBILITY CODE, ONE | | | IN EVERY SIX REQUIRED ACCESSIBLE SPACES (AT LEAST ONE) | | | IN A PARKING STRUCTURE, SHALL BE ?VAN ACCESSIBLE? AND | | | DESIGNED IN ACCORDANCE WITH SECTION OF 502 OF FLORIDA | | | ACCESSIBILITY CODE (VERTICAL CLEARANCE NOT LESS THAN 98 | | | INCHES AT SPACE AND VEHICULAR ACCESS ROUTE) | | | | | | 6. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 7. ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE DOES | | | NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL OPENINGS TO | | | MEET THE DEFINITION OF AN OPEN PARKING GARAGE, IT WILL | | | BE CONSIDERED AN ENCLOSED PARKING GARAGE AND MUST HAVE | | | EXHAUST SYSTEMS. THE EXHAUST SYSTEMS SHALL BE DESIGNED | | | TO MINIMIZE NOISE LEVELS USING INLINE FAN SILENCERS OR | | | OTHER APPROVED METHODS. | | | | | | 8. GREASE INTERCEPTOR. A GREASE INTERCEPTOR WILL BE | | | REQUIRED. FOR INFORMATION ON THE REQUIRED TYPE, SIZE | | | AND LOCATION, PLEASE CONTACT TIM LARGE, CHIEF PLUMBING | | | INSPECTOR, DEVELOPMENT SERVICES DEPARTMENT, AT (561) | | | 805-6692, OR BY EMAIL: [email protected] | | | | | | 9. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS, | | | GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND | | | OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS, | | | SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC. | | | | | | 10. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND | | | CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF | | | CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL | | | NEIGHBORING PROPERTIES. | | | | | | 11. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER | | | AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY, | | | INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE | | | CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF | | | NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION | | | THAT MAY AFFECT THE USE OF THEIR PROPERTY. | | | | | | 12. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT | | | WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL | | | HAVE A SEPARATE ADDRESS ASSIGNED BASED ON THE LOCATION | | | OF THE BUILDING ENTRANCE. FOR STREET ADDRESSING, | | | CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT | | | (561) 805 6659, OR BY EMAIL: [email protected] | | | | | | 13. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT | | | TO ART IN PUBLIC PLACES (AIPP) ASSESSMENT. FOR ADVICE | | | ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP | | | ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC | | | PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL: | | | [email protected] | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
4 |
Status |
P |
Date |
08-27-2021 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
08-27-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
08-27-2021 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
3 |
Status |
F |
Date |
08-11-2021 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
08-11-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
08-11-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-08-11 07:21:33 | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD | | | CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES, | | | PLEASE CONTACT 561-494-2262 OR [email protected]: | | | -PLEASE RELOCATE IRRIGATION METER OUT OF HARDSCAPE AND | | | INTO GRASS LANDSCAPE. METER BOX CANNOT BE IN SIDEWALK. | | | | | | -LABELS FOR 6 INCH METERS TALK ABOUT VAULTS, BUT | | | ABOVE-GROUND METERS DON?T HAVE VAULTS. THEY WILL JUST | | | HAVE CONCRETE SLAB WITH SMALLER BOXES. | | | | | | -WHICH METERS WILL FEED THE COOLING TOWER? | | | | | | -VERIFY NO CONFLICT WITH FIRELINES AND FPL UTILITIES OR | | | FPL EASEMENT INSIDE PROPERTY. | | | | | | -GUY WIRE SHOWS IN MIDDLE OF SIDEWALK NEAR NORTH | | | PROPERTY LINE ON LANDSCAPE PLAN. WILL IT REMAIN THERE | | | BY END OF PROJECT? | | | | | | -ADD VISUAL SCALE ICONS TO LANDSCAPE PLAN SHEETS | | | INCLUDING GROUND PLANTING PLAN LG-3.1. | | | | | | -GROUND PLANTING PLAN SHOWS MANY TREES IN CLOSE | | | PROXIMITY TO UTILITY INFRASTRUCTURE. CONCERNED ABOUT | | | ROOTS. THERE WERE ALSO A COUPLE TREES THAT LOOKED TO BE | | | PROPOSED ON TOP OF WATER SERVICES AND WATER MAINS. | | | PLEASE LOOK AGAIN AT THE LENGTH OF OLIVE, AND ALSO THE | | | AREAS AROUND THE 6 INCH METERS AND BACKFLOW ASSEMBLIES, | | | AND MAKE SURE NO CONFLICTS WITH TREES AND UTILITIES. | | | MAY NEED TO INCREASE CLEARANCE DISTANCE AND ADD MORE | | | ROOT BARRIERS. IF ADDING ROOT BARRIERS, MAKE SURE THEY | | | ARE DRAWN AND LABELED CLEARLY ON GROUND PLANTING PLAN. | | | | | | -ADD RP TO LABEL FOR IRRIGATION BACKFLOW ASSEMBLY ON | | | UTILITY PLAN. | | | | | | -LG3.2 SHOWS TREES PLANTED ON TOP OF STORMWATER | | | UTILITY. ARE THE TREES EXISTING OR PROPOSED? | | | | | | -FOR THE PARKING SPACES ON THE NORTH SIDE OF DIANA PL, | | | TREES ARE PLANTED CLOSE TO CURB. WILL VEHICLE | | | PASSENGERS BE ABLE TO OPEN THEIR DOORS AND EXIT | | | VEHICLES WITHOUT HITTING THE TREES? | | | | | | -IRRIGATION PLAN DOES NOT SHOW UPDATED LOCATION OF | | | IRRIGATION METER AND BACKFLOW ASSEMBLY. PLEASE UPDATE | | | IRRIGATION PLAN WITH THE UPDATED LOCATIONS SO THEY | | | MATCH CIVIL PLANS. | | | | | | -LANDSCAPING PLAN SHEET D-2 HAS EMPTY BOXES. IS IT | | | SUPPOSED TO BE EMPTY OR IS INFORMATION MISSING? | | | | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
F |
Date |
07-06-2021 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
07-06-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
07-06-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-07-06 19:05:15 | FOLLOWUP COMMENTS: | | | | | | 36. HOW WIDE IS SIDEWALK NEAR PROPOSED FIRE HYDRANT AND | | | FDC? RESPONSE: SIDEWALK DIMENSIONS HAVE BEEN ADDED TO | | | SHEET C5.00 | | | CANNOT FIND ON SHEET C5.00 PAVING PLAN OR ANY OTHER | | | SHEET. PLEASE ADD DIMENSION TO UTILITY PLAN. SIDEWALK | | | INQUIRING ABOUT IS THE ONE NORTH OF THE WATER METERS. | | | | | | | | | COMMENTS AS FOLLOWS: | | | | | | -6 INCH AND 3 INCH METERS WITH THEIR ASSOCIATED | | | BACKFLOW ASSEMBLIES NEED TO BE LOCATED OUTSIDE OF THE | | | BUILDING. LOCATION OF 6 INCH METER SHOULD BE CLOSE | | | ENOUGH TO CURB/STREET TO ACCESS WITH CRANE TRUCK | | | (APPROX. 15 FOOT REACH) | | | | | | -6 INCH AND 3 INCH METERS NEED TO BE INSTALLED ABOVE | | | GROUND VIA WATER SERVICE STANDARD DETAIL WS-3 REVISION | | | SEP2019. | | | | | | -WATER SERVICE FOR 3 INCH METER WILL HAVE A SIMILAR | | | FOOTPRINT AREA TO 6 INCH METER?S . | | | | | | -VERTICAL BACKFLOW ASSEMBLIES ARE NONSTANDARD DESIGN. | | | APPLICANT ENGINEER WOULD NEED TO DESIGN AND VERIFY | | | SETUP. | | | | | | -RP BACKFLOW ASSEMBLIES GENERALLY CANNOT BE INSTALLED | | | ENTIRELY VERTICALLY. SOME SPECIALTY MAKE/MODELS MAY | | | HAVE AN OFFSET VERTICAL SHAPE. PROPOSED BACKFLOW | | | ASSEMBLY WOULD NEED TO BE USC APPROVED FOR THE | | | MAKE/MODEL, SIZE, AND ORIENTATION. | | | | | | -LANDSCAPING MAY BE BLOCKING SIGHT AND ACCESSIBILITY TO | | | BOTH FDCS. | | | | | | -VERIFY NORTHERN FIRE HYDRANT HAS ADEQUATE CLEARANCE TO | | | TREES PER STANDARD DETAIL P-8. | | | | | | -SHOW AND LABEL THE RP BACKFLOW ASSEMBLY FOR IRRIGATION | | | WATER SERVICE ON PLANS. | | | | | | -VERIFY THERE WILL ONLY BE ONE FIRELINE WATER SERVICE | | | TO THE PROPERTY. | | | | | | -TREES ON LANDSCAPING PLAN STILL LOOK TO BE IN CONFLICT | | | WITH THE WATER MAIN ON S. OLIVE AVE. INCREASE DISTANCE | | | AND ADD ROOT BARRIERS. | | | | | | -GREASE TRAP CLEANOUT APPEARS TO CONFLICT WITH AT&T | | | UTILITY. | | | | | | -IRRIGATION WATER SERVICE IS CLOSE TO A TREE. | | | IRRIGATION METER BOX SHOULD ALSO BE LOCATED CLOSER TO | | | WATER MAIN. | | | | | | | | | RESPECTFULLY, | | | | | | MARK HURLEY | | | FIELD CUSTOMER SERVICE SUPERVISOR | | | CITY OF WEST PALM BEACH PUBLIC UTILITIES | | | 561-822-2262 | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
06-08-2021 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
06-08-2021 |
Time |
09:31 |
Rev Time |
|
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-06-08 09:31:45 | Z21050015 - FLAGLER TOWER REZONING 1315 S FLAGLER | | | INITIAL REVIEW | | | | | | 1. THE CITY OF WEST PALM BEACH HAS A NUMBER OF | | | REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY | | | AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND | | | WASTEWATER UTILITIES WITHIN THE CITY. TO VIEW | | | DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AND OTHER | | | ENGINEERING RELATED DOCUMENTS, GO HERE: | | | HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING | | | 2. CODE OF ORDINANCES, CITY OF WEST PALM BEACH, | | | FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, ADOPTED | | | SEPT. 22, 2008. (SUPPLEMENT NO. 18) CHAPTER 90 | | | UTILITIES, ARTICLE I. SEC. 90-7. | | | POLICY REGARDING EXTENSION OF WATER OR SEWER SERVICE | | | FACILITIES OF THE CITY: | | | THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE | | | CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY | | | BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS, | | | BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION. | | | 3. AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH | | | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, | | | STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR | | | MORE INFORMATION, GO TO: | | | HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING | | | 4. PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY | | | OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC | | | RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF | | | YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE | | | MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL | | | IN THE WPB ENGINEERING SERVICES DEPARTMENT AT | | | [email protected] OR 561-494-1040 FOR FURTHER | | | ASSISTANCE. | | | 5. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS | | | OF ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES, | | | INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND | | | SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES, | | | METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE | | | SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING | | | GRADES, PIPES SIZES, MATERIALS, ELEVATIONS, | | | ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL | | | INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER | | | LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE | | | PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN | | | VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. | | | PLEASE SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT | | | MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL | | | EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT, | | | INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION & | | | TELECOMMUNICATION FACILITIES LOCATED ON THE | | | RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL | | | UTILITY CROSSINGS. | | | 6. CUT AND CAP UTILITIES NOT IN USE, AND REMOVE ANY | | | ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY | | | ROW. | | | 7. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE | | | DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB | | | DEVELOPMENT APPLICATION). | | | 8. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND | | | PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM | | | AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE | | | PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER. | | | 9. SHOW VERTICAL DATUM AND DATUM CONVERSION INFORMATION | | | (NAVD 88 AND NGVD 29). | | | 10. PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND | | | STORMWATER ALONG ENTIRE PROJECT FRONTAGE. | | | 11. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND | | | IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED | | | AREAS. | | | 12. PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR | | | PROPOSED SANITARY LATERALS. | | | 13. PLEASE LABEL WATER LINES AS PRIVATE WHERE | | | APPLICABLE. | | | 14. PLEASE PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED | | | LOCATION OF WATER METER AND BACKFLOW PREVENTION. | | | 15. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE | | | SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING | | | PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT | | | HIM AT 561-494-2262 OR [email protected] | | | 16. PROVIDE DEDICATED UTILITY EASEMENTS TO ALLOW ACCESS | | | FOR CITY PERSONNEL TO PROPOSED UTILITY WATER METERS. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES | | | DEPARTMENT, (561) 494-1098 [email protected] | | | | | | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD | | | CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES, | | | PLEASE CONTACT 561-494-2262 OR [email protected]: | | | COMMENTS AS FOLLOWS: | | | | | | | | | -WILL THERE BE ANY WELLS ON SITE? | | | -WHICH METER WILL THE COOLING TOWER BE FED FROM? | | | -ON DIANA PL, SITE PLANS SHOWED GATES/DOORS OPENING | | | INTO ADJACENT PROPERTY. VERIFY THAT IS ALLOWABLE. | | | -ON SITE PLANS, SEEMED THAT SOME TOWNHOMES AND AMENITY | | | ROOM DID NOT HAVE DOORS OPENING TO OUTSIDE AT GROUND | | | LEVEL. IS THAT CORRECT? | | | -LABEL SOUTHWEST RETAINING WALL ON SITE PLAN. | | | -PAVEMENT RESTORATION PER STANDARDS WOULD BE NEEDED ON | | | CURRIE CRESCENT, DIANA PL, AND FLAGLER DR. PLEASE ADD | | | TO CIVIL PLANS. | | | -DOES THE AT&T UTILITY ON SITE HAVE AN EASEMENT? | | | -ON DEMO PLAN THERE IS A LABEL THAT SAYS REMOVE EXIST | | | SEWER SERVICE BUT POINTS TO NOTHING. | | | -CANNOT SEE AN EXISTING SEWER LATERAL FOR THE EXISTING | | | SOUTHERN BUILDING ON CIVIL PLANS. PLEASE SHOW AND LABEL | | | IF THERE IS ONE. | | | -ON DEMO PLAN ON THE NORTH SIDE THERE IS NOTATION FOR | | | GAS REMOVAL. PLEASE SHOW WHERE THE LINE ORIGINATES. | | | -ON THE UTILITY PLAN, LABEL THE STORMWATER UTILITIES | | | ADJACENT THE PROPERTY LINE AND IN THE ROW PRIVATE OR | | | CITY. | | | -THERE IS A CLEANOUT ON EAST SIDE THAT IS NOT LABELED | | | ON UTILITY PLAN. | | | -IS AN ADDITIONAL CLEANOUT NEEDED AT THE FLAGLER SEWER | | | LATERAL TO MATCH THE OTHER LATERAL? | | | -LABEL MANHOLES WITH ELEVATION INFORMATION. | | | -POSSIBLE CONFLICT WITH MANHOLE AND CURB AT FLAGLER DR. | | | -SHOW AND LABEL ALL EXISTING AND PROPOSED GATE VALVES | | | ON WATER MAINS NEAR THE PROPERTY | | | -FOR FORMAL ENGINEERING SUBMITTAL LABEL THE FIRELINE | | | POINT OF SERVICE GATE VALVE. | | | -SHOW AND LABEL ALL EXISTING AND PROPOSED FIRE | | | HYDRANTS. | | | -LABEL WHAT EACH WATER METER WILL BE USED FOR OR | | | FEEDING. | | | -DDCV CANNOT BE DOWNSTREAM OF 6 INCH METER. MUST BE ON | | | SEPARATE TAP/LINE. | | | -ADD SIZE OF DDCV TO LABEL. | | | -LARGE METERS OVER 3 INCHES NEED TO BE INSTALLED | | | ABOVE-GROUND. | | | -SHOW ALL BACKFLOW ASSEMBLIES FOR DOMESTIC/GENERAL | | | WATER USE AND LABEL WITH RP TYPE. | | | -CONSIDER DUAL/PARALLEL BACKFLOW ASSEMBLIES FOR LARGE | | | DOMESTIC METERS TO MINIMIZE WATER OUTAGES DURING | | | BACKFLOW MAINTENANCE. | | | -ONE GREASE TRAP HAS A CLEANOUTS ON BOTH SIDES, BUT THE | | | OTHER DOES NOT. IS THAT ALRIGHT? | | | -LOTS OF TREES ARE PLANTED OVER PRIVATE UTILITY PIPING | | | NEAR DRIVEWAYS AND COULD CREATE MAINTENANCE PROBLEM IN | | | FUTURE. | | | -APPEAR TO BE TREE CONFLICTS AT WEST SIDE OF PROPERTY ? | | | ESPECIALLY WITH OAK TREE THAT IS PROPOSED TO BE | | | RELOCATED CLOSE TO SANITARY SEWER PIPE. | | | -UTILITY EASEMENT NEEDED FOR PROPOSED FIRE HYDRANT. | | | -PLEASE LABEL 6 INCH WATER SERVICE LINE AND TAP IN THE | | | DRIVEWAY. | | | -IRRIGATION PLAN SHOWS 1.5 INCH METER. IS IT PRIVATE | | | SUB METER OR CITY? ALSO SHOW IT ON UTILITY PLAN. | | | -ON SHEET C500 THE RETAINING WALL LINE IS NOT POINTED | | | CORRECTLY IN THE DETAIL. | | | -ADD ELEVATION DATUM STATEMENT TO UTILITY PLAN. | | | -SHOW SEPARATE ENLARGED DETAIL AREA FOR WATER METERS | | | AND BACKFLOW ASSEMBLIES. | | | -APPEARS TO BE TREE CONFLICTS WITH UTILITIES NEAR WATER | | | METERS AND BACKFLOW ASSEMBLIES. | | | -FPL EASEMENT WOULD NEED TO BE VACATED TO ALLOW | | | BUILDING OF STRUCTURES. | | | -HOW WIDE IS SIDEWALK NEAR PROPOSED FIRE HYDRANT AND | | | FDC? | | | -WATER MAIN TAP DOES NOT APPEAR LARGE ENOUGH FOR THE | | | METERS. | | | -ADD WATER SERVICE STANDARD DETAIL FOR LARGE | | | ABOVE-GROUND DOMESTIC METER. | | | -THERE ARE UTILITY MAINTENANCE CONFLICTS WITH RETAINING | | | WALLS AND STORMWATER AND WATER UTILITIES. | | | -WOULD BACKHOE BE ABLE TO ACCESS METER AREA FOR | | | MAINTENANCE WITHOUT DAMAGING MOTOR POOL AREA? | | | -WILL THE NE SURVEY BENCHMARK REMAIN AFTER | | | CONSTRUCTION? | | | -SOME SUBMITTAL DOCUMENTS SAY 109 UNITS OR 108 DWELLING | | | UNITS, BUT ANOTHER LISTING SAID 100 UNITS, PLUS 10 | | | GUESTHOUSES AND 9 TOWNHOMES. PLEASE CLARIFY AND MAKE | | | SURE WATER DEMAND CALCULATIONS AGREE. | | | -SHOW EXISTING METERED WATER SERVICE FOR THE NORTH | | | BUILDING AND LABEL WITH WHAT IS HAPPENING TO IT. | | | | | | | | | RESPECTFULLY, | | | | | | MARK HURLEY | | | FIELD CUSTOMER SERVICE SUPERVISOR | | | CITY OF WEST PALM BEACH PUBLIC UTILITIES | | | 561-822-2262 | | | | | | | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
07-26-2021 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
07-26-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
07-26-2021 |
Time |
09:08 |
Sent To |
|
|
| Notes |
| 2021-07-26 09:10:04 | FIRE HAS NO OBJECTIONS TO THE PROPOSED AND APPROVES. | | | | | | FIRE'S APPROVAL OF THIS SUBMITTED PROJECT DOES NOT | | | CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | FIRE SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT THE | | | APPROPRIATE TIME AND IN ACCORDANCE WITH THE | | | REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
06-09-2021 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
06-09-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
06-09-2021 |
Time |
14:26 |
Sent To |
|
|
| Notes |
| 2021-06-09 14:36:27 | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, | | | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM | | | BEACH FIRE RESCUE. | | | | | | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE | | | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. | | | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS | | | ARE SUBMITTED FOR PERMIT. | | | | | | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE | | | PROPOSED PROJECT; HOWEVER, THE FOLLOWING COMMENTS ARE | | | PROVIDED AND MAY NEED FURTHER CLARIFICATIONS WHERE | | | APPLICABLE. | | | | | | UNFORTUNATELY I COULD NOT VIEW MOST OF THE SUBMITTALS | | | AS I WAS EXPERIENCING IT PROBLEMS. | | | | | | 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY | | | WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE | | | PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A | | | PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED | | | TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN | | | STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY | | | MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER | | | PROTECTION. | | | | | | 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY | | | IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING | | | ALL CONSTRUCTION ACTIVITIES. | | | | | | 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM | | | ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION. | | | ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND | | | AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT | | | WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS. | | | | | | 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE | | | REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE | | | ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS. | | | | | | 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH | | | THE 7TH EDITION OF THE FLORIDA FIRE PREVENTION CODE, | | | INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES. | | | | | | 6. ALL PARKING STRUCTURES SHALL COMPLY WITH NFPA 88A, | | | PARKING STRUCTURES AND NFPA 101, THE LIFE SAFETY CODE, | | | INCLUDING MORE SPECIFICALLY, CHAPTER 42 STORAGE | | | OCCUPANCIES (PARKING STRUCTURES) | | | | | | 7. A NFPA 13 COMPLAINT FIRE SPRINKLER SYSTEM AND NFPA | | | 14 COMPLIANT WET STANDPIPE SYSTEM ARE REQUIRED FOR THIS | | | STRUCTURE. TEMPORARY STANDPIPES ARE REQUIRED WHEN THE | | | BUILDING REACHES THREE LEVELS OR THIRTY FEET WHILE | | | BEING CONSTRUCTED. SEPARATE SHOP DRAWINGS, ARE REQUIRED | | | TO BE SUBMITTED, REVIEWED AND APPROVED BY THE FIRE | | | PREVENTION BUREAU PRIOR TO ANY INSTALLATION. | | | IT IS RECOMMENDED FOR HIGH RISES HAVE TWO SEPARATE FDC | | | LOCATIONS REMOTELY LOCATED. | | | | | | 7A. PER NFPA 14 | | | 6.4.5.4* FIRE DEPARTMENT CONNECTIONS SHALL BE LOCATED | | | NOT MORE THAN 100 FT (30.5 M) FROM THE NEAREST FIRE | | | HYDRANT CONNECTED TO AN APPROVED WATER SUPPLY. | | | | | | 7B. I WAS ABLE TO VIEW THE PROPOSED HYDRANT AND FDC ON | | | THE WEST SIDE. DUE THE SIZE OF THE PROPOSED A 2ND FDC | | | IS REQUEST ALONGFLAGLER FOR FIRE GROUND OPERATIONS. I | | | WAS UNABLE TO LOCATE A 2ND HYDRANT FOR THAT FDC. | | | | | | 7C. PER NFPA 1 | | | 18.3 WATER SUPPLIES. | | | 18.3.1* AN APPROVED WATER SUPPLY CAPABLE OF SUPPLYING | | | THE REQUIRED FIRE FLOW FOR FIRE PROTECTION SHALL BE | | | PROVIDED TO ALL PREMISES UPON WHICH FACILITIES, | | | BUILDINGS, OR PORTIONS OF BUILDINGS ARE HEREAFTER | | | CONSTRUCTED OR MOVED INTO THE JURISDICTION. THE | | | APPROVED WATER SUPPLY SHALL BE IN ACCORDANCE WITH | | | SECTION 18.4. | | | PER FLORIDA ADMINISTRATIVE CODE SECTION 61G15-32.004, | | | FIRE PROTECTION ENGINEERING DOCUMENTS SHALL INCLUDE THE | | | POINT OF SERVICE FOR THE WATER SUPPLY, A LIST OF | | | APPLICABLE NFPA STANDARDS APPLICABLE TO THE PROJECT, | | | CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR | | | AREA, SUPPRESSION SYSTEM TYPE, DESIGN DENSITIES, WATER | | | SUPPLY DATA (FIRE PUMP DATA, HYDRANT FLOW TEST DATA) | | | AND ANY PERFORMANCE BASED INFORMATION SUCH AS | | | PRE-ENGINEERED SYSTEMS. | | | FOR THE PROPOSED FIRE PUMP(S) , WHAT IS(ARE) THE | | | PRIMARY AND SECONDARY POWER SOURCES? | | | | | | 7D. THE LOCATION OF THE DDCV FIRE LINE LOCATION SHALL | | | MEET THE REQUIREMENTS OF NFPA 24 AND SHALL BE | | | COORDINATED WITH THE OFFICE OF FIRE MARSHAL, THE CITY'S | | | ENGINEERS OFFICE, THE LANDSCAPE PLANNER, AND THE CITY'S | | | PLANNING AND ZONING OFFICE. | | | | | | 8. A CLASS ?A? NFPA 72 COMPLIANT MONITORED FIRE ALARM | | | SYSTEM IS REQUIRED FOR THIS STRUCTURE. SEPARATE SHOP | | | DRAWINGS, ARE REQUIRED TO BE SUBMITTED, REVIEWED AND | | | APPROVED BY THE FIRE PREVENTION BUREAU PRIOR TO ANY | | | INSTALLATION. | | | | | | 9. ALL ELEVATORS SHALL BE EQUIPPED WITH A REGION 7 | | | KEYWAY SYSTEM. | | | ALL NEW ELEVATORS SHALL CONFORM TO THE FIRE FIGHTER?S | | | EMERGENCY OPERATIONS REQUIREMENTS OF ASME A17.1/CSA | | | B44, SAFETY CODE FOR ELEVATORS. | | | ANY BUILDING THAT IS MORE THAN THREE STORIES HIGH OR IN | | | WHICH THE VERTICAL DISTANCE BETWEEN THE BOTTOM TERMINAL | | | LANDING AND THE TOP TERMINAL LANDING EXCEEDS 25 FEET | | | MUST BE CONSTRUCTED TO CONTAIN AT LEAST ONE PASSENGER | | | ELEVATOR THAT IS OPERATIONAL AND WILL ACCOMMODATE AN | | | AMBULANCE STRETCHER 76 INCHES LONG AND 24 INCHES WIDE | | | IN THE HORIZONTAL POSITION. | | | | | | 10. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL | | | BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL | | | DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS, | | | EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A | | | PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE | | | SAFETY FEATURES AND EQUIPMENT. | | | | | | 11. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED | | | ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF | | | FIRE PREVENTION. | | | | | | ALL NEW FIRE HYDRANTS AND FDC?S PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLOSELY COORDINATED WITH THE | | | BUREAU OF FIRE PREVENTION. PROPOSED FIRE HYDRANTS AND | | | FDC?S SHOULD BE LOCATED ON THE SAME SIDE OF THE STREET | | | OR ACCESS ROADWAY TO ALLOW FREE ACCESS FOR OTHER | | | ARRIVING EMERGENCY VEHICLES. | | | | | | 12. COMMAND ROOM - THE COMMAND ROOM SHOULD BE | | | ACCESSIBLE FROM THE EXTERIOR. | | | | | | THE FIRE COMMAND CENTER SHALL COMPLY WITH NFPA 1, | | | CHAPTER 11, BUILDING SERVICES; 11.9 AND SHALL CONTAIN | | | THE FOLLOWING FEATURES: | | | 11.9.1 THE LOCATION, DESIGN, CONTENT, AND FIRE | | | DEPARTMENT ACCESS OF THE EMERGENCY COMMAND CENTER SHALL | | | BE APPROVED BY THE FIRE DEPARTMENT. | | | | | | 11.9.2 THE EMERGENCY COMMAND CENTER SHALL BE SEPARATED | | | FROM THE REMAINDER OF THE BUILDING BY A FIRE BARRIER | | | HAVING A FIRE RESISTANCE RATING OF NOT LESS THAN 1 | | | HOUR. | | | | | | 11.9.3 THE EMERGENCY COMMAND CENTER ROOM SHALL BE A | | | MINIMUM OF 96 FT2 (8.9 M2) WITH A MINIMUM DIMENSION OF | | | 8 FT (2.4 M). | | | | | | A. PER FL BLDG CODE;(MORE STRICT) IT SHALL BE A MINIMUM | | | OF 200 FT SQUARED WITH A MINIMUM DIMENSION OF 10 FT. | | | B. THE FIRE DEPARTMENT COMMUNICATIONS SYSTEM. | | | C. A TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED | | | ACCESS TO THE PUBLIC TELEPHONE SYSTEM | | | D. SCHEMATIC BUILDING PLANS INDICATING THE TYPICAL | | | FLOOR PLAN AND DETAILING THE BUILDING CORE, MEANS OF | | | EGRESS, FIRE PROTECTION SYSTEMS, FIRE-FIGHTING | | | EQUIPMENT AND FIRE DEPARTMENT ACCESS AND THE LOCATION | | | OF FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE | | | BARRIERS AND SMOKE PARTITIONS | | | E. A WORK TABLE. | | | F. IF APPLICABLE, A HAZARDOUS MATERIAL MANAGEMENT PLAN | | | FOR THE BUILDING. | | | G. THE EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM | | | CONTROL UNIT. | | | H. ANNUNCIATOR UNIT VISUALLY INDICATING THE LOCATION OF | | | THE ELEVATORS AND WHETHER THEY ARE OPERATIONAL | | | I. STATUS INDICATORS AND CONTROLS FOR AIR DISTRIBUTION | | | SYSTEMS. | | | J. CONTROLS FOR UNLOCKING STAIRWAY DOORS SIMULTANEOUSLY | | | K. SPRINKLER VALVE AND WATER FLOW DETECTOR DISPLAY | | | PANELS | | | L. EMERGENCY AND STANDBY POWER STATUS INDICATORS | | | M. FIRE PUMP STATUS INDICATORS | | | N. GENERATOR SUPERVISION DEVICES AND MANUAL START AND | | | TRANSFER FEATURES. | | | O. PUBLIC ADDRESS SYSTEM, WHERE SPECIFICALLY REQUIRED | | | BY OTHER SECTIONS OF THIS CODE | | | P. CONTROLS REQUIRED FOR SMOKE CONTROL | | | Q. ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME | | | A17.1. | | | R. ELEVATOR EMERGENCY OR STANDBY POWER SELECTOR | | | SWITCH(ES), WHERE EMERGENCY OR STANDBY POWER IS | | | PROVIDED | | | 11.8.6* EMERGENCY COMMAND CENTER. | | | 11.8.6.1 AN EMERGENCY COMMAND CENTER SHALL BE PROVIDED | | | IN A | | | LOCATION APPROVED BY THE FIRE DEPARTMENT. | | | 11.8.6.2 THE EMERGENCY COMMAND CENTER SHALL CONTAIN THE | | | FOLLOWING: | | | (1) VOICE FIRE ALARM SYSTEM PANELS AND CONTROLS | | | (2) FIRE DEPARTMENT TWO-WAY TELEPHONE COMMUNICATION | | | SERVICE | | | PANELS AND CONTROLS WHERE REQUIRED BY ANOTHER SECTION | | | OF THIS | | | CODE | | | (3) FIRE DETECTION AND FIRE ALARM SYSTEM ANNUNCIATION | | | PANELS | | | (4) ELEVATOR FLOOR LOCATION AND OPERATION ANNUNCIATORS | | | (5) ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME | | | A17.1/CSA B44, SAFETY CODE FOR ELEVATORS AND ESCALATORS | | | (6) ELEVATOR EMERGENCY POWER SELECTOR SWITCH(ES) WHERE | | | PROVIDED | | | IN ACCORDANCE WITH ASME A17.1/CSA B44 | | | (7) SPRINKLER VALVE AND WATERFLOW ANNUNCIATORS | | | (8) EMERGENCY GENERATOR STATUS INDICATORS | | | (9) CONTROLS FOR ANY AUTOMATIC STAIRWAY DOOR UNLOCKING | | | SYSTEM | | | (10) FIRE PUMP STATUS INDICATORS | | | (11) TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED | | | ACCESS TO THE | | | PUBLIC TELEPHONE SYSTEM | | | (12) STAIRWAY VIDEO MONITORING EQUIPMENT AS REQUIRED BY | | | 11.8.8 | | | | | | 13. TWO-WAY RADIO ENHANCEMENT | | | NFPA 1, CHAPTER 11, BUILDING SERVICES; 11.10 TWO-WAY | | | RADIO ENHANCEMENT SERVICES. | | | 11.10.1 IN ALL NEW AND EXISTING BUILDINGS, MINIMUM | | | RADIO SIGNAL STRENGTH FOR FIRE DEPARTMENT | | | COMMUNICATIONS SHALL BE MAINTAINED AT A LEVEL | | | DETERMINED BY THE AHJ. | | | NFPA 72, 24.5.2* TWO-WAY RADIO COMMUNICATIONS | | | ENHANCEMENT SYSTEMS. | | | 24.5.2.2 RADIO COVERAGE. RADIO COVERAGE SHALL BE | | | PROVIDED THROUGHOUT THE BUILDING AS A PERCENTAGE OF | | | FLOOR AREA AS SPECIFIED IN 24.5.2.2.1 THROUGH | | | 24.5.2.2.3. | | | 24.5.2.2.1 CRITICAL AREAS. CRITICAL AREAS, SUCH AS THE | | | EMERGENCY COMMAND CENTER(S), THE FIRE PUMP ROOM(S), | | | EXIT STAIRS, EXIT PASSAGEWAYS, ELEVATOR LOBBIES, | | | STANDPIPE CABINETS, SPRINKLER SECTIONAL VALVE | | | LOCATIONS, AND OTHER AREAS DEEMED CRITICAL BY THE | | | AUTHORITY HAVING JURISDICTION, SHALL BE PROVIDED WITH | | | 99 PERCENT FLOOR AREA RADIO COVERAGE. | | | 24.5.2.2.2 GENERAL BUILDING AREAS. GENERAL BUILDING | | | AREAS SHALL BE PROVIDED WITH 90 PERCENT FLOOR AREA | | | RADIO COVERAGE. | | | 24.5.2.3 SIGNAL STRENGTH. | | | 24.5.2.3.1 INBOUND. A MINIMUM INBOUND SIGNAL STRENGTH | | | OF -95 DBM, OR OTHER SIGNAL STRENGTH AS REQUIRED BY THE | | | AUTHORITY HAVING JURISDICTION, SHALL BE PROVIDED | | | THROUGHOUT THE COVERAGE AREA. | | | 24.5.2.3.2 OUTBOUND. A MINIMUM OUTBOUND SIGNAL STRENGTH | | | OF -95 DBM AT THE DONOR SITE, OR OTHER SIGNAL STRENGTH | | | AS REQUIRED BY THE AUTHORITY HAVING JURISDICTION, SHALL | | | BE PROVIDED FROM THE COVERAGE AREA. | | | | | | THE SYSTEM SHALL MAINTAIN A MINIMUM RADIO SIGNAL | | | STRENGTH FOR THE RADIO SYSTEM USED BY WEST PALM BEACH | | | FIRE RESCUE. TESTING SHALL BE BY AN ACCEPTABLE NATIONAL | | | STANDARD DOCUMENTING PERCENTAGES NOTED ABOVE AND BY | | | ACTUAL RADIO TESTING BY FIRE PERSONNEL. IF THE MINIMUM | | | CANNOT BE MAINTAINED, A BI-DIRECTIONAL AMPLIFIED SYSTEM | | | SHALL BE INSTALLED WITH A MINIMUM 2-HOUR RUN TIME | | | BATTERY BACK-UP. | | | | | | PLEASE CONTACT MARK FILLA, PALM BEACH COUNTY PUBLIC | | | SAFETY RADIO SYSTEMS MANAGER, [email protected], | | | 561-233-0837; AS OUR RADIOS OPERATE ON THEIR SYSTEM FOR | | | DETAILED RADIO FREQUENCY AND INSTALLATION INSTRUCTIONS. | | | | | | | | | 14. KNOX-BOX KEY SYSTEM SHALL BE REQUIRED FOR THIS | | | BUILDING. | | | ANY GATES SHALL BE PROVIDED WITH KNOX KEY ACCESS LOCKS, | | | PADLOCKS AND/OR SWITCHES FOR 24 HOUR EMERGENCY ACCESS. | | | | | | 15. THE SMOKE CONTROL SYSTEM SHALL COMPLY WITH NFPA | | | 101, CHAPTER 9, BUILDING SERVICE AND FIRE PROTECTION | | | EQUIPMENT, INCLUDING: | | | THE SMOKE CONTROL SYSTEMS SHALL BE INSTALLED, | | | INSPECTED, TESTED, AND MAINTAINED IN ACCORDANCE WITH | | | NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS; NFPA 204, | | | STANDARD FOR SMOKE AND HEAT VENTING; OR NATIONALLY | | | RECOGNIZED STANDARDS, ENGINEERING GUIDES, OR | | | RECOMMENDED PRACTICES, AS APPROVED BY THE AUTHORITY | | | HAVING JURISDICTION. | | | THE ENGINEER OF RECORD SHALL CLEARLY IDENTIFY THE | | | INTENT OF THE SYSTEM, THE DESIGN METHOD USED, THE | | | APPROPRIATENESS OF THE METHOD USED, AND THE REQUIRED | | | MEANS OF INSPECTING, TESTING, AND MAINTAINING THE | | | SYSTEM. | | | ACCEPTANCE TESTING SHALL BE PERFORMED BY A SPECIAL | | | INSPECTOR IN ACCORDANCE WITH SECTION 9.9. | | | | | | 16. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT | | | DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | 17. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING | | | PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH | | | THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
8 |
Status |
P |
Date |
11-08-2021 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
11-08-2021 |
Time |
12:05 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
11-08-2021 |
Time |
12:04 |
Sent To |
|
|
| Notes |
| 2021-11-08 12:05:15 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: FLAGLER TOWER Z21050015 | | | NOVEMBER 8, 2021 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | REVIEW: FLAGLER TOWERS 7/20/21 | | | 1. PREVIOUSLY SATISFIED | | | 2. PREVIOUSLY SATISFIED | | | 3. PREVIOUSLY SATISFIED | | | 4. SATISFIED. DUE TO THE CONSTRUCTION IMPACT ON THE | | | EXISTING MATURE TREES ON CITY PROPERTY ALONG DIANA PL. | | | REMOVE FICUS TREES AND REPLACE WITH 1 TO 1 CATEGORY | | | SHADE TREE. (SEE #5) | | | 7/27/21 RC: PLAN IS ALREADY IN PLACE BETWEEN PLANNING | | | AND PARKS AND REC. TO REPLACE FICUS WITH GREEN BUTTON | | | WOOD IN AGREEMENT WITH THE NORTON PARK PLACE CONDO. | | | APPLICANTS MAINTENANCE RESPONSIBILITY FOR TREES ON | | | NORTH SIDE OF DIANA PLACE. | | | 7/20/2021 | | | 6. 7/27/21 RC. MAKE THE FOLLOWING CORRECTIONS TO THE | | | TREE DISPOSITION LIST: | | | ? SATISFIED. SHOW THE DISPOSITION OF TREES #1479 ? | | | #1530. | | | ? SATISFIED. IDENTIFY TREE #1504 | | | ? SATISFIED. PROVIDE MITIGATION SQUARE FOOTAGE DUE FOR | | | TREES AND PALMS LISTED TO BE REMOVED. ON EXISTING TREES | | | ON SITE LIST AND EXISTING TREES ON ADJACENT SITE LIST. | | | 7. SATISFIED. SEE COMMENT #6 TREE #1479 ON TREE LIST | | | WILL NEED TO BE LISTED AS REMOVE TO REFLECT DEPICTION | | | ON THE MAP. PAGE D-1 | | | 8. SATISFIED. APPLICANT NEEDS PROVIDE LANDSCAPE PLANS | | | FOR POOL TERRACE PAGE LA 3-1. THE LANDSCAPING ON THE | | | AMENITIES LEVEL WILL BE APPROVED WITH PROJECT AND NEEDS | | | TO BE SUBMITTED. | | | 9. SATISFIED. LIVE OAK TREES ON FLAGLER APPEAR TO BE IN | | | CONFLICT WITH MAN HOLE COVERS AND STORM WATER LINE. | | | ADJUST LINE OR TREE LOCATIONS TO BE RESOLVE. | | | 10. SATISFIED. LIVE OAK ON SOUTH SIDE BUFFER APPEARS TO | | | BE TOO CLOSE TO BUILDING AND ENTRY CANOPY AND WILL | | | OUTGROW ITS SPACE CREATING A CONFLICT WITH THE BUILDING | | | AND SHADE CANOPY. | | | THE TREES DO NOT APPEAR ON THE LANDSCAPE PLAN SHEET | | | LG-3.1. IF THIS IS IN ERROR, PROVIDE A MANAGEMENT PLAN | | | FOR THE MAINTENANCE OF THE TREES. | | | 11. SATISFIED. IN EAST SIDE COURTYARD THERE IS A STRAY | | | UNMARKED DIAGONAL LINE GOING ACROSS. IDENTIFY LINE OR | | | REMOVE IF IT?S NOT INTENTIONAL. | | | SENIOR LANDSCAPE PLANNER WILL RETURN ON 7/22 PLAN IS | | | SUBJECT TO HIS REVIEW | | | 7/27/21 RC. | | | 13. SATISFIED. ALL LANDSCAPE PLANS NEED TO BE ON AT | | | LEAST 1-20 SCALE PLAN AS THE CURRENT SCALE IS NOT | | | READABLE | | | 14. SATISFIED. SHOW OPEN SPACE SQUARE FOOTAGE FOR THE | | | NON-BUILDING AREA OF THE LOT. ADJUST OPEN SPACE DIAGRAM | | | ON SHEET LR-2. LANDSCAPING OVER BUILDING STRUCTURE IS | | | NOT COUNTED FOR OPEN SPACE. PROVIDE A DIAGRAM SHOWING | | | LANDSCAPED AREAS. | | | 15. SATISFIED. USING THE OPEN SPACE SQUARE FOOTAGE | | | CALCULATE THE NUMBER OF REQUIRED SHADE TREES, FLOWERING | | | TREES AND SHRUBS PER SECTION 94-442 (C) (2) B. ADD THE | | | TOTAL TREES REQUIRED FOR OPEN SPACE AND FOR MULTIFAMILY | | | REQUIREMENT AND SHOW THE TOTAL REQUIRED TREES. | | | 16. SATISFIED. SHOW THE PROVIDED LINEAR FEET OF | | | LANDSCAPING FOR THE BUILDING PERIMETER. | | | ABOVE GROUND POTS AND PLANTERS MAY NOT BE COUNTED AS | | | PERIMETER LANDSCAPE. THERE ARE AREAS ADJACENT TO THE | | | BUILDING ON THE OLIVE SIDE AND SHOWN AS PLANTINGS THAT | | | DO NOT APPEAR AS OPENINGS IN THE PAVED AREAS. CLEARLY | | | IDENTIFY THESE AREAS AND RECALCULATE THE PERIMETER | | | LANDSCAPE. | | | 17. SATISFIED. ADD A NATIVE COLUMN TO THE PLANT | | | SCHEDULE SO STAFF CAN VERIFY REQUIREMENTS. | | | 18. SATISFIED. MAGNOLIA MAY BE COUNTED AS NATIVE. | | | 19. SATISFIED. FLORIDA FRIENDLY REQUIREMENTS. PROVIDE | | | AN AREA PLAN SHOWING THE SOD AREAS AS PART OF THE TOTAL | | | LANDSCAPE AREA AND PROVIDE THE TOTAL PERCENTAGE. ITEM | | | 6B DOES NOT APPLY. | | | ITEM 6B STILL DOES NOT APPLY. | | | 20. SATISFIED. PROVIDE ADDITIONAL INFORMATION ON SEA | | | PLUM TREE IN ORDER TO IDENTIFY IF IT IS A CULTIVAR OF | | | SEA GRAPE. | | | 21. SATISFIED. TOTAL NUMBER OF TREES PROVIDED NEEDS TO | | | BE SHOWN FROM THE PLANT LIST. CURRENT COUNT IS 92 TREES | | | PLUS 11 CABBAGE PALMS AT 3:1 FOR A TOTAL OF 95. SHOW | | | RELOCATED TREES ON THE PLANT LIST. SHOW OFFSITE TREES | | | ON THE PLANT LIST. IF REQUIRED TREES ARE NOT TO BE | | | PROVIDED ON SITE A WAVER MUST BE REQUESTED. | | | 22. SATISFIED. THE TREES PROVIDED ON THE AMENITY AREA | | | ON FLAGLER NEED TO BE SPREAD OUT TO PROVIDE SHADE FOR | | | PEDESTRIANS. | | | THE INTENT FOR THE OVERALL PEDESTRIAN PLAN FOR THE CITY | | | IS TO PROVIDE TREE CANOPY SHADE OVER PUBLIC AREAS AND | | | PEDESTRIAN SIDEWALKS. THE LARGE GAP ADJACENT TO THE | | | PLAZA DOES NOT MEET THIS INTENT. STAFF DOES NOT | | | RECOGNIZE HAVING THE TREES IN FRONT OF THE PLAZA AS A | | | SAFETY ISSUE, AS THE TREES WOULD MEET CPTED (CRIME | | | PREVENTION THROUGH ENVIRONMENTAL DESIGN) | | | RECOMMENDATIONS FOR THE TREE BRANCHING TO BE ABOVE 7 | | | FEET. PEDESTRIAN ENJOYMENT OF THE PUBLIC WALKWAY ALSO | | | OUTWEIGHS THE NEEDS OF THE PROPERTY OWNER TO EXPOSE THE | | | ARCHITECTURE OF THE BUILDING. | | | 23. CONDITIONALLY SATISFIED. TRANSPLANTED OAK TREE | | | #1538 APPEARS TO BE PROBLEMATIC IN THE SPECIFIED | | | LOCATION THAT IT WILL CONFLICT WITH THE BUILDING | | | CONSTRUCTION. TRANSPLANTED TREES MAY BE RELOCATED OFF | | | SITE. THIS APPEARS THIS COULD ALSO BE AN ISSUE WITH THE | | | OTHER RELOCATED TREES AND PALMS. | | | THE APPLICANT HAS A NOTE PLACED ON THE PLANS FOR | | | TEMPORARY STORAGE OF THE RELOCATED TREES. PROVIDE A | | | MORE DETAILED PLAN ON HOW THIS WILL BE IMPLEMENTED. THE | | | RELOCATED LIVE OAK IS SHOWN WITH PAVING PROPOSED OVER | | | THE ROOT SYSTEM AT ITS NEW LOCATION THAT WILL NOT BE | | | PRACTICAL OR HEALTHY FOR THE TREE. THE RENDERINGS SHOW | | | GRASS AREA. A SUSPENDED PAVING SYSTEM OR SOIL CELLS | | | MUST BE PROVIDED IF THE TREE IS TO BE SUSTAINABLE. | | | PROVIDE THE RELOCATION AND MANAGEMENT PLAN FOR THE | | | TREES BEFORE, DURING AND AFTER RELOCATION AND INCLUDE | | | IT ON THE TREE DISPOSITION PLAN. | | | THE APPLICANT HAS PROVIDED INFORMATION IN THE COMMENT | | | RESPONSES, BUT THAT INFORMATION NEEDS TO BE IN A | | | MANAGEMENT PLAN SUBMITTED FOR REVIEW. | | | ADDITIONAL COMMENTS 8/18/21: | | | 24. SATISFIED. TREE COUNT ON THE PLANT LIST OF 29 LIVE | | | OAK TREES DOES NOT MATCH THE PLAN SHOWING 30 TREES. | | | 25. SATISFIED. THE SIDEWALK PROPOSED ALONG OLIVE AVE. | | | APPEARS TO BE TOO CLOSE TO EXISTING TREES AND PALMS. | | | PROVIDE MORE DETAIL ON HOW THIS WILL BE ADDRESSED. | | | SITE PLAN DOES NOT MATCH ADJUSTED SIDEWALK ON THE | | | LANDSCAPE PLAN. | | | 26. SATISFIED. PROVIDE SCREENING HEDGES FOR ALL GROUND | | | MOUNTED EQUIPMENT INCLUDING WATER AND FIRE BACKFLOWS ON | | | THE CURRIE CRESCENT SIDE OF THE BUILDING. | | | 27. SATISFIED. VINES ARE SHOWN ON THE RENDERINGS ON THE | | | WALL OF THE EAST SIDE OF THE BUILDING, BUT NO PLANTS | | | ARE SHOWN ON THE LANDSCAPE PLAN. CORRECT TO SHOW THE | | | PLANTINGS. | | | 28. SATISFIED. PROVIDE THE TOTAL MITIGATION DUE FOR THE | | | ON SITE TREES AND PALMS TO BE REMOVED. ADONIDIA PALMS | | | ARE CATEGORY 4 AND REQUIRE 50 SQ FT CANOPY MITIGATION | | | PER TRUNK, SPANISH CHERRY IS LISTED UNDER CATEGORY 1 | | | AND REQUIRES 300 SQ FT CANOPY MITIGATION. PROVIDE THE | | | LIST OF TREES ADDED TO THE SITE AND ASSIGN THE CANOPY | | | CREDITS BASED ON THE CATEGORY AND PROVIDE THE TOTAL. | | | THERE ARE CORRECTIONS REQUIRED FOR THE ONSITE AND | | | OFFSITE MITIGATION CALCULATIONS. | | | CALCULATIONS FOR THE MITIGATION PROVIDED ON SITE BASED | | | ON THE PLANT LIST SHOULD BE REMOVED FROM SHEET L-3.4 | | | AND PLACED IN A CHART ON SHEET D-2. SABAL PALMS ARE | | | CATEGORY 3 AND ARE 100 SQ FT CREDIT. TOTAL EXCESS OF | | | TREE CANOPY NEEDS TO BE SHOWN. | | | 29. THE PLANTING PLANS FOR THE OFF SITE TREES NEED TO | | | BE REVISED TO SHOW THE FOLLOWING: | | | ? SATISFIED. THE ROYAL PALMS BETWEEN THE GREEN | | | BUTTONWOOD TREES ARE NOT APPROPRIATE TO DUPLICATE THE | | | CURRENT LOOK OF THE TREE CANOPY AND THEY WOULD PRESENT | | | A SAFETY AND MAINTENANCE ISSUE OVER THE PAVEMENT AND | | | PARKING SPACES. REMOVE THE ROW OF PALMS ADJACENT TO THE | | | CURB. | | | THERE IS A GAP IN THE TREE CANOPY ON THE SOUTH SIDE OF | | | ACTION PL. ADJACENT TO THE ANGLED PARKING SPACES. GREEN | | | BUTTONWOOD TREES MUST BE PLACED ALONG THIS AREA | | | REPLACING THE ROYAL PALMS. | | | | | | ? SATISFIED. THERE IS NOT ENOUGH ROOM PROVIDED FOR THE | | | ROOT ZONE OF THE TREES. THE SIDEWALK NEEDS TO BE PUSHED | | | FARTHER AWAY FROM THE CURB (10 TO 12 FEET) ALLOWING | | | ENOUGH ROOT SPACE FOR THE TREES AND THE NARROWER | | | LANDSCAPE AREA ON THE BACK OF SIDEWALK. ROYAL PALMS | | | COULD BE PLACED IN THIS STRIP, BUT THEY WOULD HAVE TO | | | BE FAR ENOUGH AWAY FROM THE SIDEWALK TO AVOID FRONDS | | | DROPPING ON THE SIDEWALK. | | | ? SATISFIED. PROVIDE THE TOTAL TREE CANOPY MITIGATION | | | DUE FOR THE REMOVED TREES AND PROVIDE THE MITIGATION | | | SQUARE FOOTAGE PROVIDED FOR THE NEW TREES AND PALMS | | | PROPOSED. IF THERE IS MITIGATION DUE, STAFF WILL | | | DISCUSS OPTIONS TO ADDRESS IT. | | | THERE ARE CORRECTIONS REQUIRED FOR THE ONSITE AND | | | OFFSITE MITIGATION CALCULATIONS. | | | | | | SHOW THE TOTAL MITIGATION DUE AFTER CREDITS ON SHEET | | | D-2. | | | | | | ? SATISFIED. INCREASING THE NUMBER OF GREEN BUTTONWOOD | | | TREES AND ROYAL PALMS WOULD INCREASE THE PUBLIC | | | BENEFITS AND THE AESTHETICS. | | | ? SATISFIED. EXPLAIN WHY THERE IS A GAP ON THE CORNER | | | OF OLIVE AND DIANA WITH NO TREE CANOPY PROVIDED. THIS | | | WAS A LOCATION SUGGESTED BY STAFF FOR THE RELOCATED | | | LIVE OAK TREE. | | | | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | | | | 2. THE APPLICANT, SUCCESSORS SHALL BE RESPONSIBLE FOR | | | THE PERMITTING AND INSTALLATION OF THE STREET TREES, | | | LANDSCAPING AND IRRIGATION IN THE RIGHT OF WAY AND ON | | | THE CITY PARCEL ADJACENT TO THE SITE APPROVED WITH THIS | | | PETITION. | | | 3. SEE CONDITION #5. THE APPLICANT, SUCCESSORS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE STREET TREES, | | | LANDSCAPING AND IRRIGATION IN THE RIGHT OF WAY AND ON | | | THE CITY PARCEL ADJACENT TO THE SITE APPROVED WITH THIS | | | PETITION. THIS WILL BE THROUGH A SEPARATE MAINTENANCE | | | AGREEMENT WITH THE CITY THAT MUST BE COMPLETED PRIOR TO | | | THE FINAL CO FOR THE BUILDING. | | | 4. SATISFIED. PRIOR TO SCHEDULING FOR CITY COMMISSION, | | | THE APPLICANT SHALL REVISE THE LANDSCAPE PLANS TO SHOW | | | THE ROYAL PALMS AS 1:1 CREDIT TOWARD TREES PER SECTION | | | 94-442 (D) AND CORRECT THE TREE COUNTS FOR OFF SITE | | | PALMS ON SHEET L-3.4 TO 44. | | | 5. PRIOR TO SCHEDULING FOR CITY COMMISSION, THE | | | APPLICANT SHALL MAKE THE FOLLOWING REVISIONS TO THE | | | TREE RELOCATION MANAGEMENT PLAN: | | | A) LIVE OAK TREE #1536: | | | IF OPTION #1 TO KEEP THE TREE IN ITS CURRENT LOCATION | | | IS TO BE FINAL, | | | 1) THE TREE RELOCATION MANAGEMENT PLAN WILL BE REVISED | | | TO REFLECT THIS CHOICE AND ADJUSTED TO ITEMIZE ALL | | | ACTIONS TO BE COMPLETED AT EACH STAGE OF CONSTRUCTION. | | | 2) ALL PLANS MUST BE AMENDED TO SHOW THE PERMANENT | | | LOCATION. | | | 3) THE TREE WILL BE MONITORED DAILY AND A WEEKLY REPORT | | | SUBMITTED TO THE CITY ON THE CONDITION UNTIL THE FINAL | | | LANDSCAPE INSPECTION. | | | IF OPTION #2 TO RELOCATE THE TREE TO A LOCATION NEAR | | | THE SITE IS TO BE FINAL, | | | 1) THE TREE RELOCATION MANAGEMENT PLAN WILL BE REVISED | | | TO REFLECT THIS CHOICE AND ADJUSTED TO ITEMIZE ALL | | | ACTIONS TO BE COMPLETED AT EACH STAGE OF CONSTRUCTION. | | | 2) ALL PLANS MUST BE AMENDED TO SHOW THE PERMANENT | | | LOCATION. | | | 3) THE TREE SHALL BE MONITORED DAILY AND A WEEKLY | | | REPORT SUBMITTED TO THE CITY ON THE CONDITION UNTIL THE | | | FINAL LANDSCAPE INSPECTION AND MAINTAINED THEREAFTER IN | | | ACCORDANCE WITH THE REQUIREMENTS OF SECTION 94-448 (E)3 | | | FOR ONE YEAR FROM THE DATE OF PLANTING IN THE FINAL | | | LOCATION. | | | SINCE OPTION #3 IS NOT SUPPORTED BY THE ARBORIST OR THE | | | CITY AS PREFERABLE, THIS SHALL NOT BE AN OPTION AND | | | SHALL BE REMOVED FROM THE REPORT. | | | B) MAHOGANY TREES #1502, 1503, 1507, 1520, 1539, AND | | | 1540: | | | | | | 1) IF THE TREES ARE TO BE MOVED TO A TEMPORARY HOLDING | | | AREA, THE LOCATION OF THE TEMPORARY HOLDING AREA SHALL | | | BE ESTABLISHED AND AGREEMENTS FOR STORAGE OF THE TREES | | | ACCEPTABLE TO THE CITY SHALL BE ESTABLISHED WITH THE | | | OWNER OF THE PROPERTY. | | | 2) THE TREE RELOCATION MANAGEMENT PLAN WILL BE REVISED | | | TO REFLECT THIS CHOICE AND ADJUSTED TO ITEMIZE ALL | | | ACTIONS TO BE COMPLETED AT EACH STAGE OF CONSTRUCTION. | | | | | | 3) THE TREES SHALL BE MONITORED DAILY AND A WEEKLY | | | REPORT SUBMITTED TO THE CITY ON THEIR CONDITION UNTIL | | | THE FINAL LANDSCAPE INSPECTION AND MONITORED THEREAFTER | | | IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 94-448 | | | (E)3 FOR ONE YEAR FROM THE DATE OF PLANTING IN THE | | | FINAL LOCATION. | | | | | | C) SABAL PALMS (34): | | | | | | 1) IF THE PALMS ARE TO BE MOVED TO A TEMPORARY HOLDING | | | AREA, THE LOCATION OF THE TEMPORARY HOLDING AREA SHALL | | | BE ESTABLISHED AND AGREEMENTS FOR STORAGE OF THE TREES | | | ACCEPTABLE TO THE CITY SHALL BE ESTABLISHED WITH THE | | | OWNER OF THE PROPERTY. | | | 2) IF THE PALMS ARE TO BE TRANSPORTED TO A COMMERCIAL | | | NURSERY OFF SITE, THE CONTRACTOR AND NURSERY SHALL BE | | | IDENTIFIED. | | | 3) THE TREE RELOCATION MANAGEMENT PLAN WILL BE REVISED | | | TO REFLECT THIS CHOICE AND ADJUSTED TO ITEMIZE ALL | | | ACTIONS TO BE COMPLETED AT EACH STAGE OF CONSTRUCTION. | | | 4) THE PALMS SHALL BE MONITORED DAILY AND A WEEKLY | | | REPORT SUBMITTED TO THE CITY ON THEIR CONDITION UNTIL | | | THE FINAL LANDSCAPE INSPECTION AND MONITORED THEREAFTER | | | IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 94-448 | | | (E)3 FOR ONE YEAR FROM THE DATE OF PLANTING IN THE | | | FINAL LOCATION. | | | | | | 1. SATISFIED. A LETTER SIGNED BY THE PROPERTY OWNER OF | | | 1531 S OLIVE AVENUE INDICATING THAT THEY WILL ACCEPT | | | THE LIVE OAK TREE FOR RELOCATION TO THEIR PROPERTY AND | | | WILL ACCEPT OWNERSHIP AND MAINTAIN IT FOLLOWING THE | | | REQUIREMENTS OF THE CITY. | | | 2. SATISFIED. 2.5 IRRIGATION C. WILL BE AMENDED TO | | | INDICATE THAT RELOCATED TREES SHALL HAVE THE ENTIRE | | | ROOTBALL IRRIGATED ADEQUATELY UNTIL ESTABLISHMENT. | | | 3. SATISFIED. A SITE VISIT REVEALED THAT TREES #1539 | | | AND #1540 ARE CALLOPHYLLUM TREES, NOT MAHOGANY. | | | CORRECTIONS MUST BE MADE TO ALL PLANS. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
7 |
Status |
P |
Date |
09-29-2021 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
09-29-2021 |
Time |
14:19 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
09-29-2021 |
Time |
14:19 |
Sent To |
|
|
| Notes |
| 2021-09-29 14:21:02 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: FLAGLER TOWER Z21050015 | | | SEPTEMBER 29, 2021 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | REVIEW: FLAGLER TOWERS 7/20/21 | | | 1. PREVIOUSLY SATISFIED | | | 2. PREVIOUSLY SATISFIED | | | 3. PREVIOUSLY SATISFIED | | | 4. SATISFIED. DUE TO THE CONSTRUCTION IMPACT ON THE | | | EXISTING MATURE TREES ON CITY PROPERTY ALONG DIANA PL. | | | REMOVE FICUS TREES AND REPLACE WITH 1 TO 1 CATEGORY | | | SHADE TREE. (SEE #5) | | | 7/27/21 RC: PLAN IS ALREADY IN PLACE BETWEEN PLANNING | | | AND PARKS AND REC. TO REPLACE FICUS WITH GREEN BUTTON | | | WOOD IN AGREEMENT WITH THE NORTON PARK PLACE CONDO. | | | APPLICANTS MAINTENANCE RESPONSIBILITY FOR TREES ON | | | NORTH SIDE OF DIANA PLACE. | | | 7/20/2021 | | | 6. 7/27/21 RC. MAKE THE FOLLOWING CORRECTIONS TO THE | | | TREE DISPOSITION LIST: | | | ? SATISFIED. SHOW THE DISPOSITION OF TREES #1479 ? | | | #1530. | | | ? SATISFIED. IDENTIFY TREE #1504 | | | ? SATISFIED. PROVIDE MITIGATION SQUARE FOOTAGE DUE FOR | | | TREES AND PALMS LISTED TO BE REMOVED. ON EXISTING TREES | | | ON SITE LIST AND EXISTING TREES ON ADJACENT SITE LIST. | | | 7. SATISFIED. SEE COMMENT #6 TREE #1479 ON TREE LIST | | | WILL NEED TO BE LISTED AS REMOVE TO REFLECT DEPICTION | | | ON THE MAP. PAGE D-1 | | | 8. SATISFIED. APPLICANT NEEDS PROVIDE LANDSCAPE PLANS | | | FOR POOL TERRACE PAGE LA 3-1. THE LANDSCAPING ON THE | | | AMENITIES LEVEL WILL BE APPROVED WITH PROJECT AND NEEDS | | | TO BE SUBMITTED. | | | 9. SATISFIED. LIVE OAK TREES ON FLAGLER APPEAR TO BE IN | | | CONFLICT WITH MAN HOLE COVERS AND STORM WATER LINE. | | | ADJUST LINE OR TREE LOCATIONS TO BE RESOLVE. | | | 10. SATISFIED. LIVE OAK ON SOUTH SIDE BUFFER APPEARS TO | | | BE TOO CLOSE TO BUILDING AND ENTRY CANOPY AND WILL | | | OUTGROW ITS SPACE CREATING A CONFLICT WITH THE BUILDING | | | AND SHADE CANOPY. | | | THE TREES DO NOT APPEAR ON THE LANDSCAPE PLAN SHEET | | | LG-3.1. IF THIS IS IN ERROR, PROVIDE A MANAGEMENT PLAN | | | FOR THE MAINTENANCE OF THE TREES. | | | 11. SATISFIED. IN EAST SIDE COURTYARD THERE IS A STRAY | | | UNMARKED DIAGONAL LINE GOING ACROSS. IDENTIFY LINE OR | | | REMOVE IF IT?S NOT INTENTIONAL. | | | SENIOR LANDSCAPE PLANNER WILL RETURN ON 7/22 PLAN IS | | | SUBJECT TO HIS REVIEW | | | 7/27/21 RC. | | | 13. SATISFIED. ALL LANDSCAPE PLANS NEED TO BE ON AT | | | LEAST 1-20 SCALE PLAN AS THE CURRENT SCALE IS NOT | | | READABLE | | | 14. SATISFIED. SHOW OPEN SPACE SQUARE FOOTAGE FOR THE | | | NON-BUILDING AREA OF THE LOT. ADJUST OPEN SPACE DIAGRAM | | | ON SHEET LR-2. LANDSCAPING OVER BUILDING STRUCTURE IS | | | NOT COUNTED FOR OPEN SPACE. PROVIDE A DIAGRAM SHOWING | | | LANDSCAPED AREAS. | | | 15. SATISFIED. USING THE OPEN SPACE SQUARE FOOTAGE | | | CALCULATE THE NUMBER OF REQUIRED SHADE TREES, FLOWERING | | | TREES AND SHRUBS PER SECTION 94-442 (C) (2) B. ADD THE | | | TOTAL TREES REQUIRED FOR OPEN SPACE AND FOR MULTIFAMILY | | | REQUIREMENT AND SHOW THE TOTAL REQUIRED TREES. | | | 16. SATISFIED. SHOW THE PROVIDED LINEAR FEET OF | | | LANDSCAPING FOR THE BUILDING PERIMETER. | | | ABOVE GROUND POTS AND PLANTERS MAY NOT BE COUNTED AS | | | PERIMETER LANDSCAPE. THERE ARE AREAS ADJACENT TO THE | | | BUILDING ON THE OLIVE SIDE AND SHOWN AS PLANTINGS THAT | | | DO NOT APPEAR AS OPENINGS IN THE PAVED AREAS. CLEARLY | | | IDENTIFY THESE AREAS AND RECALCULATE THE PERIMETER | | | LANDSCAPE. | | | 17. SATISFIED. ADD A NATIVE COLUMN TO THE PLANT | | | SCHEDULE SO STAFF CAN VERIFY REQUIREMENTS. | | | 18. SATISFIED. MAGNOLIA MAY BE COUNTED AS NATIVE. | | | 19. SATISFIED. FLORIDA FRIENDLY REQUIREMENTS. PROVIDE | | | AN AREA PLAN SHOWING THE SOD AREAS AS PART OF THE TOTAL | | | LANDSCAPE AREA AND PROVIDE THE TOTAL PERCENTAGE. ITEM | | | 6B DOES NOT APPLY. | | | ITEM 6B STILL DOES NOT APPLY. | | | 20. SATISFIED. PROVIDE ADDITIONAL INFORMATION ON SEA | | | PLUM TREE IN ORDER TO IDENTIFY IF IT IS A CULTIVAR OF | | | SEA GRAPE. | | | 21. SATISFIED. TOTAL NUMBER OF TREES PROVIDED NEEDS TO | | | BE SHOWN FROM THE PLANT LIST. CURRENT COUNT IS 92 TREES | | | PLUS 11 CABBAGE PALMS AT 3:1 FOR A TOTAL OF 95. SHOW | | | RELOCATED TREES ON THE PLANT LIST. SHOW OFFSITE TREES | | | ON THE PLANT LIST. IF REQUIRED TREES ARE NOT TO BE | | | PROVIDED ON SITE A WAVER MUST BE REQUESTED. | | | 22. SATISFIED. THE TREES PROVIDED ON THE AMENITY AREA | | | ON FLAGLER NEED TO BE SPREAD OUT TO PROVIDE SHADE FOR | | | PEDESTRIANS. | | | THE INTENT FOR THE OVERALL PEDESTRIAN PLAN FOR THE CITY | | | IS TO PROVIDE TREE CANOPY SHADE OVER PUBLIC AREAS AND | | | PEDESTRIAN SIDEWALKS. THE LARGE GAP ADJACENT TO THE | | | PLAZA DOES NOT MEET THIS INTENT. STAFF DOES NOT | | | RECOGNIZE HAVING THE TREES IN FRONT OF THE PLAZA AS A | | | SAFETY ISSUE, AS THE TREES WOULD MEET CPTED (CRIME | | | PREVENTION THROUGH ENVIRONMENTAL DESIGN) | | | RECOMMENDATIONS FOR THE TREE BRANCHING TO BE ABOVE 7 | | | FEET. PEDESTRIAN ENJOYMENT OF THE PUBLIC WALKWAY ALSO | | | OUTWEIGHS THE NEEDS OF THE PROPERTY OWNER TO EXPOSE THE | | | ARCHITECTURE OF THE BUILDING. | | | 23. CONDITIONALLY SATISFIED. TRANSPLANTED OAK TREE | | | #1538 APPEARS TO BE PROBLEMATIC IN THE SPECIFIED | | | LOCATION THAT IT WILL CONFLICT WITH THE BUILDING | | | CONSTRUCTION. TRANSPLANTED TREES MAY BE RELOCATED OFF | | | SITE. THIS APPEARS THIS COULD ALSO BE AN ISSUE WITH THE | | | OTHER RELOCATED TREES AND PALMS. | | | THE APPLICANT HAS A NOTE PLACED ON THE PLANS FOR | | | TEMPORARY STORAGE OF THE RELOCATED TREES. PROVIDE A | | | MORE DETAILED PLAN ON HOW THIS WILL BE IMPLEMENTED. THE | | | RELOCATED LIVE OAK IS SHOWN WITH PAVING PROPOSED OVER | | | THE ROOT SYSTEM AT ITS NEW LOCATION THAT WILL NOT BE | | | PRACTICAL OR HEALTHY FOR THE TREE. THE RENDERINGS SHOW | | | GRASS AREA. A SUSPENDED PAVING SYSTEM OR SOIL CELLS | | | MUST BE PROVIDED IF THE TREE IS TO BE SUSTAINABLE. | | | PROVIDE THE RELOCATION AND MANAGEMENT PLAN FOR THE | | | TREES BEFORE, DURING AND AFTER RELOCATION AND INCLUDE | | | IT ON THE TREE DISPOSITION PLAN. | | | THE APPLICANT HAS PROVIDED INFORMATION IN THE COMMENT | | | RESPONSES, BUT THAT INFORMATION NEEDS TO BE IN A | | | MANAGEMENT PLAN SUBMITTED FOR REVIEW. | | | ADDITIONAL COMMENTS 8/18/21: | | | 24. SATISFIED. TREE COUNT ON THE PLANT LIST OF 29 LIVE | | | OAK TREES DOES NOT MATCH THE PLAN SHOWING 30 TREES. | | | 25. SATISFIED. THE SIDEWALK PROPOSED ALONG OLIVE AVE. | | | APPEARS TO BE TOO CLOSE TO EXISTING TREES AND PALMS. | | | PROVIDE MORE DETAIL ON HOW THIS WILL BE ADDRESSED. | | | SITE PLAN DOES NOT MATCH ADJUSTED SIDEWALK ON THE | | | LANDSCAPE PLAN. | | | 26. SATISFIED. PROVIDE SCREENING HEDGES FOR ALL GROUND | | | MOUNTED EQUIPMENT INCLUDING WATER AND FIRE BACKFLOWS ON | | | THE CURRIE CRESCENT SIDE OF THE BUILDING. | | | 27. SATISFIED. VINES ARE SHOWN ON THE RENDERINGS ON THE | | | WALL OF THE EAST SIDE OF THE BUILDING, BUT NO PLANTS | | | ARE SHOWN ON THE LANDSCAPE PLAN. CORRECT TO SHOW THE | | | PLANTINGS. | | | 28. SATISFIED. PROVIDE THE TOTAL MITIGATION DUE FOR THE | | | ON SITE TREES AND PALMS TO BE REMOVED. ADONIDIA PALMS | | | ARE CATEGORY 4 AND REQUIRE 50 SQ FT CANOPY MITIGATION | | | PER TRUNK, SPANISH CHERRY IS LISTED UNDER CATEGORY 1 | | | AND REQUIRES 300 SQ FT CANOPY MITIGATION. PROVIDE THE | | | LIST OF TREES ADDED TO THE SITE AND ASSIGN THE CANOPY | | | CREDITS BASED ON THE CATEGORY AND PROVIDE THE TOTAL. | | | THERE ARE CORRECTIONS REQUIRED FOR THE ONSITE AND | | | OFFSITE MITIGATION CALCULATIONS. | | | CALCULATIONS FOR THE MITIGATION PROVIDED ON SITE BASED | | | ON THE PLANT LIST SHOULD BE REMOVED FROM SHEET L-3.4 | | | AND PLACED IN A CHART ON SHEET D-2. SABAL PALMS ARE | | | CATEGORY 3 AND ARE 100 SQ FT CREDIT. TOTAL EXCESS OF | | | TREE CANOPY NEEDS TO BE SHOWN. | | | 29. THE PLANTING PLANS FOR THE OFF SITE TREES NEED TO | | | BE REVISED TO SHOW THE FOLLOWING: | | | ? SATISFIED. THE ROYAL PALMS BETWEEN THE GREEN | | | BUTTONWOOD TREES ARE NOT APPROPRIATE TO DUPLICATE THE | | | CURRENT LOOK OF THE TREE CANOPY AND THEY WOULD PRESENT | | | A SAFETY AND MAINTENANCE ISSUE OVER THE PAVEMENT AND | | | PARKING SPACES. REMOVE THE ROW OF PALMS ADJACENT TO THE | | | CURB. | | | THERE IS A GAP IN THE TREE CANOPY ON THE SOUTH SIDE OF | | | ACTION PL. ADJACENT TO THE ANGLED PARKING SPACES. GREEN | | | BUTTONWOOD TREES MUST BE PLACED ALONG THIS AREA | | | REPLACING THE ROYAL PALMS. | | | | | | ? SATISFIED. THERE IS NOT ENOUGH ROOM PROVIDED FOR THE | | | ROOT ZONE OF THE TREES. THE SIDEWALK NEEDS TO BE PUSHED | | | FARTHER AWAY FROM THE CURB (10 TO 12 FEET) ALLOWING | | | ENOUGH ROOT SPACE FOR THE TREES AND THE NARROWER | | | LANDSCAPE AREA ON THE BACK OF SIDEWALK. ROYAL PALMS | | | COULD BE PLACED IN THIS STRIP, BUT THEY WOULD HAVE TO | | | BE FAR ENOUGH AWAY FROM THE SIDEWALK TO AVOID FRONDS | | | DROPPING ON THE SIDEWALK. | | | ? SATISFIED. PROVIDE THE TOTAL TREE CANOPY MITIGATION | | | DUE FOR THE REMOVED TREES AND PROVIDE THE MITIGATION | | | SQUARE FOOTAGE PROVIDED FOR THE NEW TREES AND PALMS | | | PROPOSED. IF THERE IS MITIGATION DUE, STAFF WILL | | | DISCUSS OPTIONS TO ADDRESS IT. | | | THERE ARE CORRECTIONS REQUIRED FOR THE ONSITE AND | | | OFFSITE MITIGATION CALCULATIONS. | | | | | | SHOW THE TOTAL MITIGATION DUE AFTER CREDITS ON SHEET | | | D-2. | | | | | | ? SATISFIED. INCREASING THE NUMBER OF GREEN BUTTONWOOD | | | TREES AND ROYAL PALMS WOULD INCREASE THE PUBLIC | | | BENEFITS AND THE AESTHETICS. | | | ? SATISFIED. EXPLAIN WHY THERE IS A GAP ON THE CORNER | | | OF OLIVE AND DIANA WITH NO TREE CANOPY PROVIDED. THIS | | | WAS A LOCATION SUGGESTED BY STAFF FOR THE RELOCATED | | | LIVE OAK TREE. | | | | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | | | | 2. THE APPLICANT, SUCCESSORS SHALL BE RESPONSIBLE FOR | | | THE PERMITTING AND INSTALLATION OF THE STREET TREES, | | | LANDSCAPING AND IRRIGATION IN THE RIGHT OF WAY AND ON | | | THE CITY PARCEL ADJACENT TO THE SITE APPROVED WITH THIS | | | PETITION. | | | 3. THE APPLICANT, SUCCESSORS SHALL BE RESPONSIBLE FOR | | | THE MAINTENANCE OF THE STREET TREES, LANDSCAPING AND | | | IRRIGATION IN THE RIGHT OF WAY AND ON THE CITY PARCEL | | | ADJACENT TO THE SITE APPROVED WITH THIS PETITION. THIS | | | WILL BE THROUGH A SEPARATE MAINTENANCE AGREEMENT WITH | | | THE CITY THAT MUST BE COMPLETED PRIOR TO THE FINAL CO | | | FOR THE BUILDING. | | | 4. PRIOR TO SCHEDULING FOR CITY COMMISSION, THE | | | APPLICANT SHALL REVISE THE LANDSCAPE PLANS TO SHOW THE | | | ROYAL PALMS AS 1:1 CREDIT TOWARD TREES PER SECTION | | | 94-442 (D) AND CORRECT THE TREE COUNTS FOR OFF SITE | | | PALMS ON SHEET L-3.4 TO 44. | | | 5. PRIOR TO SCHEDULING FOR CITY COMMISSION, THE | | | APPLICANT SHALL MAKE THE FOLLOWING REVISIONS TO THE | | | TREE RELOCATION MANAGEMENT PLAN: | | | A) LIVE OAK TREE #1536: | | | IF OPTION #1 TO KEEP THE TREE IN ITS CURRENT LOCATION | | | IS TO BE FINAL, | | | 1) THE TREE RELOCATION MANAGEMENT PLAN WILL BE REVISED | | | TO REFLECT THIS CHOICE AND ADJUSTED TO ITEMIZE ALL | | | ACTIONS TO BE COMPLETED AT EACH STAGE OF CONSTRUCTION. | | | 2) ALL PLANS MUST BE AMENDED TO SHOW THE PERMANENT | | | LOCATION. | | | 3) THE TREE WILL BE MONITORED DAILY AND A WEEKLY REPORT | | | SUBMITTED TO THE CITY ON THE CONDITION UNTIL THE FINAL | | | LANDSCAPE INSPECTION. | | | IF OPTION #2 TO RELOCATE THE TREE TO A LOCATION NEAR | | | THE SITE IS TO BE FINAL, | | | 1) THE TREE RELOCATION MANAGEMENT PLAN WILL BE REVISED | | | TO REFLECT THIS CHOICE AND ADJUSTED TO ITEMIZE ALL | | | ACTIONS TO BE COMPLETED AT EACH STAGE OF CONSTRUCTION. | | | 2) ALL PLANS MUST BE AMENDED TO SHOW THE PERMANENT | | | LOCATION. | | | 3) THE TREE SHALL BE MONITORED DAILY AND A WEEKLY | | | REPORT SUBMITTED TO THE CITY ON THE CONDITION UNTIL THE | | | FINAL LANDSCAPE INSPECTION AND MAINTAINED THEREAFTER IN | | | ACCORDANCE WITH THE REQUIREMENTS OF SECTION 94-448 (E)3 | | | FOR ONE YEAR FROM THE DATE OF PLANTING IN THE FINAL | | | LOCATION. | | | SINCE OPTION #3 IS NOT SUPPORTED BY THE ARBORIST OR THE | | | CITY AS PREFERABLE, THIS SHALL NOT BE AN OPTION AND | | | SHALL BE REMOVED FROM THE REPORT. | | | B) MAHOGANY TREES #1502, 1503, 1507, 1520, 1539, AND | | | 1540: | | | | | | 1) IF THE TREES ARE TO BE MOVED TO A TEMPORARY HOLDING | | | AREA, THE LOCATION OF THE TEMPORARY HOLDING AREA SHALL | | | BE ESTABLISHED AND AGREEMENTS FOR STORAGE OF THE TREES | | | ACCEPTABLE TO THE CITY SHALL BE ESTABLISHED WITH THE | | | OWNER OF THE PROPERTY. | | | 2) THE TREE RELOCATION MANAGEMENT PLAN WILL BE REVISED | | | TO REFLECT THIS CHOICE AND ADJUSTED TO ITEMIZE ALL | | | ACTIONS TO BE COMPLETED AT EACH STAGE OF CONSTRUCTION. | | | | | | 3) THE TREES SHALL BE MONITORED DAILY AND A WEEKLY | | | REPORT SUBMITTED TO THE CITY ON THEIR CONDITION UNTIL | | | THE FINAL LANDSCAPE INSPECTION AND MONITORED THEREAFTER | | | IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 94-448 | | | (E)3 FOR ONE YEAR FROM THE DATE OF PLANTING IN THE | | | FINAL LOCATION. | | | | | | C) SABAL PALMS (34): | | | | | | 1) IF THE PALMS ARE TO BE MOVED TO A TEMPORARY HOLDING | | | AREA, THE LOCATION OF THE TEMPORARY HOLDING AREA SHALL | | | BE ESTABLISHED AND AGREEMENTS FOR STORAGE OF THE TREES | | | ACCEPTABLE TO THE CITY SHALL BE ESTABLISHED WITH THE | | | OWNER OF THE PROPERTY. | | | 2) IF THE PALMS ARE TO BE TRANSPORTED TO A COMMERCIAL | | | NURSERY OFF SITE, THE CONTRACTOR AND NURSERY SHALL BE | | | IDENTIFIED. | | | 3) THE TREE RELOCATION MANAGEMENT PLAN WILL BE REVISED | | | TO REFLECT THIS CHOICE AND ADJUSTED TO ITEMIZE ALL | | | ACTIONS TO BE COMPLETED AT EACH STAGE OF CONSTRUCTION. | | | 4) THE PALMS SHALL BE MONITORED DAILY AND A WEEKLY | | | REPORT SUBMITTED TO THE CITY ON THEIR CONDITION UNTIL | | | THE FINAL LANDSCAPE INSPECTION AND MONITORED THEREAFTER | | | IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 94-448 | | | (E)3 FOR ONE YEAR FROM THE DATE OF PLANTING IN THE | | | FINAL LOCATION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
6 |
Status |
F |
Date |
09-24-2021 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
09-24-2021 |
Time |
16:32 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
09-24-2021 |
Time |
16:32 |
Sent To |
|
|
| Notes |
| 2021-09-24 16:33:13 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: FLAGLER TOWER Z21050015 | | | SEPTEMBER 22, 2021 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | REVIEW: FLAGLER TOWERS 7/20/21 | | | 1. PREVIOUSLY SATISFIED | | | 2. PREVIOUSLY SATISFIED | | | 3. PREVIOUSLY SATISFIED | | | 4. SATISFIED. DUE TO THE CONSTRUCTION IMPACT ON THE | | | EXISTING MATURE TREES ON CITY PROPERTY ALONG DIANA PL. | | | REMOVE FICUS TREES AND REPLACE WITH 1 TO 1 CATEGORY | | | SHADE TREE. (SEE #5) | | | 7/27/21 RC: PLAN IS ALREADY IN PLACE BETWEEN PLANNING | | | AND PARKS AND REC. TO REPLACE FICUS WITH GREEN BUTTON | | | WOOD IN AGREEMENT WITH THE NORTON PARK PLACE CONDO. | | | APPLICANTS MAINTENANCE RESPONSIBILITY FOR TREES ON | | | NORTH SIDE OF DIANA PLACE. | | | 7/20/2021 | | | 6. 7/27/21 RC. MAKE THE FOLLOWING CORRECTIONS TO THE | | | TREE DISPOSITION LIST: | | | ? SATISFIED. SHOW THE DISPOSITION OF TREES #1479 ? | | | #1530. | | | ? SATISFIED. IDENTIFY TREE #1504 | | | ? SATISFIED. PROVIDE MITIGATION SQUARE FOOTAGE DUE FOR | | | TREES AND PALMS LISTED TO BE REMOVED. ON EXISTING TREES | | | ON SITE LIST AND EXISTING TREES ON ADJACENT SITE LIST. | | | 7. SATISFIED. SEE COMMENT #6 TREE #1479 ON TREE LIST | | | WILL NEED TO BE LISTED AS REMOVE TO REFLECT DEPICTION | | | ON THE MAP. PAGE D-1 | | | 8. SATISFIED. APPLICANT NEEDS PROVIDE LANDSCAPE PLANS | | | FOR POOL TERRACE PAGE LA 3-1. THE LANDSCAPING ON THE | | | AMENITIES LEVEL WILL BE APPROVED WITH PROJECT AND NEEDS | | | TO BE SUBMITTED. | | | 9. SATISFIED. LIVE OAK TREES ON FLAGLER APPEAR TO BE IN | | | CONFLICT WITH MAN HOLE COVERS AND STORM WATER LINE. | | | ADJUST LINE OR TREE LOCATIONS TO BE RESOLVE. | | | 10. SATISFIED. LIVE OAK ON SOUTH SIDE BUFFER APPEARS TO | | | BE TOO CLOSE TO BUILDING AND ENTRY CANOPY AND WILL | | | OUTGROW ITS SPACE CREATING A CONFLICT WITH THE BUILDING | | | AND SHADE CANOPY. | | | THE TREES DO NOT APPEAR ON THE LANDSCAPE PLAN SHEET | | | LG-3.1. IF THIS IS IN ERROR, PROVIDE A MANAGEMENT PLAN | | | FOR THE MAINTENANCE OF THE TREES. | | | 11. SATISFIED. IN EAST SIDE COURTYARD THERE IS A STRAY | | | UNMARKED DIAGONAL LINE GOING ACROSS. IDENTIFY LINE OR | | | REMOVE IF IT?S NOT INTENTIONAL. | | | SENIOR LANDSCAPE PLANNER WILL RETURN ON 7/22 PLAN IS | | | SUBJECT TO HIS REVIEW | | | 7/27/21 RC. | | | 13. SATISFIED. ALL LANDSCAPE PLANS NEED TO BE ON AT | | | LEAST 1-20 SCALE PLAN AS THE CURRENT SCALE IS NOT | | | READABLE | | | 14. SATISFIED. SHOW OPEN SPACE SQUARE FOOTAGE FOR THE | | | NON-BUILDING AREA OF THE LOT. ADJUST OPEN SPACE DIAGRAM | | | ON SHEET LR-2. LANDSCAPING OVER BUILDING STRUCTURE IS | | | NOT COUNTED FOR OPEN SPACE. PROVIDE A DIAGRAM SHOWING | | | LANDSCAPED AREAS. | | | 15. SATISFIED. USING THE OPEN SPACE SQUARE FOOTAGE | | | CALCULATE THE NUMBER OF REQUIRED SHADE TREES, FLOWERING | | | TREES AND SHRUBS PER SECTION 94-442 (C) (2) B. ADD THE | | | TOTAL TREES REQUIRED FOR OPEN SPACE AND FOR MULTIFAMILY | | | REQUIREMENT AND SHOW THE TOTAL REQUIRED TREES. | | | 16. SATISFIED. SHOW THE PROVIDED LINEAR FEET OF | | | LANDSCAPING FOR THE BUILDING PERIMETER. | | | ABOVE GROUND POTS AND PLANTERS MAY NOT BE COUNTED AS | | | PERIMETER LANDSCAPE. THERE ARE AREAS ADJACENT TO THE | | | BUILDING ON THE OLIVE SIDE AND SHOWN AS PLANTINGS THAT | | | DO NOT APPEAR AS OPENINGS IN THE PAVED AREAS. CLEARLY | | | IDENTIFY THESE AREAS AND RECALCULATE THE PERIMETER | | | LANDSCAPE. | | | 17. SATISFIED. ADD A NATIVE COLUMN TO THE PLANT | | | SCHEDULE SO STAFF CAN VERIFY REQUIREMENTS. | | | 18. SATISFIED. MAGNOLIA MAY BE COUNTED AS NATIVE. | | | 19. SATISFIED. FLORIDA FRIENDLY REQUIREMENTS. PROVIDE | | | AN AREA PLAN SHOWING THE SOD AREAS AS PART OF THE TOTAL | | | LANDSCAPE AREA AND PROVIDE THE TOTAL PERCENTAGE. ITEM | | | 6B DOES NOT APPLY. | | | ITEM 6B STILL DOES NOT APPLY. | | | 20. SATISFIED. PROVIDE ADDITIONAL INFORMATION ON SEA | | | PLUM TREE IN ORDER TO IDENTIFY IF IT IS A CULTIVAR OF | | | SEA GRAPE. | | | 21. SATISFIED. TOTAL NUMBER OF TREES PROVIDED NEEDS TO | | | BE SHOWN FROM THE PLANT LIST. CURRENT COUNT IS 92 TREES | | | PLUS 11 CABBAGE PALMS AT 3:1 FOR A TOTAL OF 95. SHOW | | | RELOCATED TREES ON THE PLANT LIST. SHOW OFFSITE TREES | | | ON THE PLANT LIST. IF REQUIRED TREES ARE NOT TO BE | | | PROVIDED ON SITE A WAVER MUST BE REQUESTED. | | | 22. SATISFIED. THE TREES PROVIDED ON THE AMENITY AREA | | | ON FLAGLER NEED TO BE SPREAD OUT TO PROVIDE SHADE FOR | | | PEDESTRIANS. | | | THE INTENT FOR THE OVERALL PEDESTRIAN PLAN FOR THE CITY | | | IS TO PROVIDE TREE CANOPY SHADE OVER PUBLIC AREAS AND | | | PEDESTRIAN SIDEWALKS. THE LARGE GAP ADJACENT TO THE | | | PLAZA DOES NOT MEET THIS INTENT. STAFF DOES NOT | | | RECOGNIZE HAVING THE TREES IN FRONT OF THE PLAZA AS A | | | SAFETY ISSUE, AS THE TREES WOULD MEET CPTED (CRIME | | | PREVENTION THROUGH ENVIRONMENTAL DESIGN) | | | RECOMMENDATIONS FOR THE TREE BRANCHING TO BE ABOVE 7 | | | FEET. PEDESTRIAN ENJOYMENT OF THE PUBLIC WALKWAY ALSO | | | OUTWEIGHS THE NEEDS OF THE PROPERTY OWNER TO EXPOSE THE | | | ARCHITECTURE OF THE BUILDING. | | | 23. PARTIALLY SATISFIED. TRANSPLANTED OAK TREE #1538 | | | APPEARS TO BE PROBLEMATIC IN THE SPECIFIED LOCATION | | | THAT IT WILL CONFLICT WITH THE BUILDING CONSTRUCTION. | | | TRANSPLANTED TREES MAY BE RELOCATED OFF SITE. THIS | | | APPEARS THIS COULD ALSO BE AN ISSUE WITH THE OTHER | | | RELOCATED TREES AND PALMS. | | | THE APPLICANT HAS A NOTE PLACED ON THE PLANS FOR | | | TEMPORARY STORAGE OF THE RELOCATED TREES. PROVIDE A | | | MORE DETAILED PLAN ON HOW THIS WILL BE IMPLEMENTED. THE | | | RELOCATED LIVE OAK IS SHOWN WITH PAVING PROPOSED OVER | | | THE ROOT SYSTEM AT ITS NEW LOCATION THAT WILL NOT BE | | | PRACTICAL OR HEALTHY FOR THE TREE. THE RENDERINGS SHOW | | | GRASS AREA. A SUSPENDED PAVING SYSTEM OR SOIL CELLS | | | MUST BE PROVIDED IF THE TREE IS TO BE SUSTAINABLE. | | | PROVIDE THE RELOCATION AND MANAGEMENT PLAN FOR THE | | | TREES BEFORE, DURING AND AFTER RELOCATION AND INCLUDE | | | IT ON THE TREE DISPOSITION PLAN. | | | THE APPLICANT HAS PROVIDED INFORMATION IN THE COMMENT | | | RESPONSES, BUT THAT INFORMATION NEEDS TO BE IN A | | | MANAGEMENT PLAN SUBMITTED FOR REVIEW. | | | ADDITIONAL COMMENTS 8/18/21: | | | 24. SATISFIED. TREE COUNT ON THE PLANT LIST OF 29 LIVE | | | OAK TREES DOES NOT MATCH THE PLAN SHOWING 30 TREES. | | | 25. SATISFIED. THE SIDEWALK PROPOSED ALONG OLIVE AVE. | | | APPEARS TO BE TOO CLOSE TO EXISTING TREES AND PALMS. | | | PROVIDE MORE DETAIL ON HOW THIS WILL BE ADDRESSED. | | | SITE PLAN DOES NOT MATCH ADJUSTED SIDEWALK ON THE | | | LANDSCAPE PLAN. | | | 26. SATISFIED. PROVIDE SCREENING HEDGES FOR ALL GROUND | | | MOUNTED EQUIPMENT INCLUDING WATER AND FIRE BACKFLOWS ON | | | THE CURRIE CRESCENT SIDE OF THE BUILDING. | | | 27. SATISFIED. VINES ARE SHOWN ON THE RENDERINGS ON THE | | | WALL OF THE EAST SIDE OF THE BUILDING, BUT NO PLANTS | | | ARE SHOWN ON THE LANDSCAPE PLAN. CORRECT TO SHOW THE | | | PLANTINGS. | | | 28. PARTIALLY SATISFIED. PROVIDE THE TOTAL MITIGATION | | | DUE FOR THE ON SITE TREES AND PALMS TO BE REMOVED. | | | ADONIDIA PALMS ARE CATEGORY 4 AND REQUIRE 50 SQ FT | | | CANOPY MITIGATION PER TRUNK, SPANISH CHERRY IS LISTED | | | UNDER CATEGORY 1 AND REQUIRES 300 SQ FT CANOPY | | | MITIGATION. PROVIDE THE LIST OF TREES ADDED TO THE SITE | | | AND ASSIGN THE CANOPY CREDITS BASED ON THE CATEGORY AND | | | PROVIDE THE TOTAL. | | | THERE ARE CORRECTIONS REQUIRED FOR THE ONSITE AND | | | OFFSITE MITIGATION CALCULATIONS. | | | CALCULATIONS FOR THE MITIGATION PROVIDED ON SITE BASED | | | ON THE PLANT LIST SHOULD BE REMOVED FROM SHEET L-3.4 | | | AND PLACED IN A CHART ON SHEET D-2. SABAL PALMS ARE | | | CATEGORY 3 AND ARE 100 SQ FT CREDIT. TOTAL EXCESS OF | | | TREE CANOPY NEEDS TO BE SHOWN. | | | 29. THE PLANTING PLANS FOR THE OFF SITE TREES NEED TO | | | BE REVISED TO SHOW THE FOLLOWING: | | | ? SATISFIED. THE ROYAL PALMS BETWEEN THE GREEN | | | BUTTONWOOD TREES ARE NOT APPROPRIATE TO DUPLICATE THE | | | CURRENT LOOK OF THE TREE CANOPY AND THEY WOULD PRESENT | | | A SAFETY AND MAINTENANCE ISSUE OVER THE PAVEMENT AND | | | PARKING SPACES. REMOVE THE ROW OF PALMS ADJACENT TO THE | | | CURB. | | | THERE IS A GAP IN THE TREE CANOPY ON THE SOUTH SIDE OF | | | ACTION PL. ADJACENT TO THE ANGLED PARKING SPACES. GREEN | | | BUTTONWOOD TREES MUST BE PLACED ALONG THIS AREA | | | REPLACING THE ROYAL PALMS. | | | | | | ? SATISFIED. THERE IS NOT ENOUGH ROOM PROVIDED FOR THE | | | ROOT ZONE OF THE TREES. THE SIDEWALK NEEDS TO BE PUSHED | | | FARTHER AWAY FROM THE CURB (10 TO 12 FEET) ALLOWING | | | ENOUGH ROOT SPACE FOR THE TREES AND THE NARROWER | | | LANDSCAPE AREA ON THE BACK OF SIDEWALK. ROYAL PALMS | | | COULD BE PLACED IN THIS STRIP, BUT THEY WOULD HAVE TO | | | BE FAR ENOUGH AWAY FROM THE SIDEWALK TO AVOID FRONDS | | | DROPPING ON THE SIDEWALK. | | | ? PARTIALLY SATISFIED. PROVIDE THE TOTAL TREE CANOPY | | | MITIGATION DUE FOR THE REMOVED TREES AND PROVIDE THE | | | MITIGATION SQUARE FOOTAGE PROVIDED FOR THE NEW TREES | | | AND PALMS PROPOSED. IF THERE IS MITIGATION DUE, STAFF | | | WILL DISCUSS OPTIONS TO ADDRESS IT. | | | THERE ARE CORRECTIONS REQUIRED FOR THE ONSITE AND | | | OFFSITE MITIGATION CALCULATIONS. | | | | | | SHOW THE TOTAL MITIGATION DUE AFTER CREDITS ON SHEET | | | D-2. | | | | | | ? SATISFIED. INCREASING THE NUMBER OF GREEN BUTTONWOOD | | | TREES AND ROYAL PALMS WOULD INCREASE THE PUBLIC | | | BENEFITS AND THE AESTHETICS. | | | ? SATISFIED. EXPLAIN WHY THERE IS A GAP ON THE CORNER | | | OF OLIVE AND DIANA WITH NO TREE CANOPY PROVIDED. THIS | | | WAS A LOCATION SUGGESTED BY STAFF FOR THE RELOCATED | | | LIVE OAK TREE. | | | | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | | | | 2. THE APPLICANT, SUCCESSORS SHALL BE RESPONSIBLE FOR | | | THE PERMITTING AND INSTALLATION OF THE STREET TREES AND | | | RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH | | | THIS PETITION. | | | | | | 3. THE APPLICANT, SUCCESSORS SHALL BE RESPONSIBLE FOR | | | THE MAINTENANCE OF THE, ROAD RIGHT OF WAY | | | LANDSCAPING/TREES AND IRRIGATION. THIS WILL BE THROUGH | | | A SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
5 |
Status |
F |
Date |
09-01-2021 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
09-01-2021 |
Time |
16:49 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
09-01-2021 |
Time |
16:49 |
Sent To |
|
|
| Notes |
| 2021-09-01 16:49:51 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: FLAGLER TOWER Z21050015 | | | AUGUST 31, 2021 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | REVIEW: FLAGLER TOWERS 7/20/21 | | | 1. PREVIOUSLY SATISFIED | | | 2. PREVIOUSLY SATISFIED | | | 3. PREVIOUSLY SATISFIED | | | 4. SATISFIED. DUE TO THE CONSTRUCTION IMPACT ON THE | | | EXISTING MATURE TREES ON CITY PROPERTY ALONG DIANA PL. | | | REMOVE FICUS TREES AND REPLACE WITH 1 TO 1 CATEGORY | | | SHADE TREE. (SEE #5) | | | 7/27/21 RC: PLAN IS ALREADY IN PLACE BETWEEN PLANNING | | | AND PARKS AND REC. TO REPLACE FICUS WITH GREEN BUTTON | | | WOOD IN AGREEMENT WITH THE NORTON PARK PLACE CONDO. | | | APPLICANTS MAINTENANCE RESPONSIBILITY FOR TREES ON | | | NORTH SIDE OF DIANA PLACE. | | | 7/20/2021 | | | 6. 7/27/21 RC. MAKE THE FOLLOWING CORRECTIONS TO THE | | | TREE DISPOSITION LIST: | | | ? SATISFIED. SHOW THE DISPOSITION OF TREES #1479 ? | | | #1530. | | | ? SATISFIED. IDENTIFY TREE #1504 | | | ? SATISFIED. PROVIDE MITIGATION SQUARE FOOTAGE DUE FOR | | | TREES AND PALMS LISTED TO BE REMOVED. ON EXISTING TREES | | | ON SITE LIST AND EXISTING TREES ON ADJACENT SITE LIST. | | | 7. SATISFIED. SEE COMMENT #6 TREE #1479 ON TREE LIST | | | WILL NEED TO BE LISTED AS REMOVE TO REFLECT DEPICTION | | | ON THE MAP. PAGE D-1 | | | 8. SATISFIED. APPLICANT NEEDS PROVIDE LANDSCAPE PLANS | | | FOR POOL TERRACE PAGE LA 3-1. THE LANDSCAPING ON THE | | | AMENITIES LEVEL WILL BE APPROVED WITH PROJECT AND NEEDS | | | TO BE SUBMITTED. | | | 9. SATISFIED. LIVE OAK TREES ON FLAGLER APPEAR TO BE IN | | | CONFLICT WITH MAN HOLE COVERS AND STORM WATER LINE. | | | ADJUST LINE OR TREE LOCATIONS TO BE RESOLVE. | | | 10. SATISFIED. LIVE OAK ON SOUTH SIDE BUFFER APPEARS TO | | | BE TOO CLOSE TO BUILDING AND ENTRY CANOPY AND WILL | | | OUTGROW ITS SPACE CREATING A CONFLICT WITH THE BUILDING | | | AND SHADE CANOPY. | | | THE TREES DO NOT APPEAR ON THE LANDSCAPE PLAN SHEET | | | LG-3.1. IF THIS IS IN ERROR, PROVIDE A MANAGEMENT PLAN | | | FOR THE MAINTENANCE OF THE TREES. | | | 11. SATISFIED. IN EAST SIDE COURTYARD THERE IS A STRAY | | | UNMARKED DIAGONAL LINE GOING ACROSS. IDENTIFY LINE OR | | | REMOVE IF IT?S NOT INTENTIONAL. | | | SENIOR LANDSCAPE PLANNER WILL RETURN ON 7/22 PLAN IS | | | SUBJECT TO HIS REVIEW | | | 7/27/21 RC. | | | 13. SATISFIED. ALL LANDSCAPE PLANS NEED TO BE ON AT | | | LEAST 1-20 SCALE PLAN AS THE CURRENT SCALE IS NOT | | | READABLE | | | 14. SATISFIED. SHOW OPEN SPACE SQUARE FOOTAGE FOR THE | | | NON-BUILDING AREA OF THE LOT. ADJUST OPEN SPACE DIAGRAM | | | ON SHEET LR-2. LANDSCAPING OVER BUILDING STRUCTURE IS | | | NOT COUNTED FOR OPEN SPACE. PROVIDE A DIAGRAM SHOWING | | | LANDSCAPED AREAS. | | | 15. SATISFIED. USING THE OPEN SPACE SQUARE FOOTAGE | | | CALCULATE THE NUMBER OF REQUIRED SHADE TREES, FLOWERING | | | TREES AND SHRUBS PER SECTION 94-442 (C) (2) B. ADD THE | | | TOTAL TREES REQUIRED FOR OPEN SPACE AND FOR MULTIFAMILY | | | REQUIREMENT AND SHOW THE TOTAL REQUIRED TREES. | | | 16. SATISFIED. SHOW THE PROVIDED LINEAR FEET OF | | | LANDSCAPING FOR THE BUILDING PERIMETER. | | | ABOVE GROUND POTS AND PLANTERS MAY NOT BE COUNTED AS | | | PERIMETER LANDSCAPE. THERE ARE AREAS ADJACENT TO THE | | | BUILDING ON THE OLIVE SIDE AND SHOWN AS PLANTINGS THAT | | | DO NOT APPEAR AS OPENINGS IN THE PAVED AREAS. CLEARLY | | | IDENTIFY THESE AREAS AND RECALCULATE THE PERIMETER | | | LANDSCAPE. | | | 17. SATISFIED. ADD A NATIVE COLUMN TO THE PLANT | | | SCHEDULE SO STAFF CAN VERIFY REQUIREMENTS. | | | 18. SATISFIED. MAGNOLIA MAY BE COUNTED AS NATIVE. | | | 19. SATISFIED. FLORIDA FRIENDLY REQUIREMENTS. PROVIDE | | | AN AREA PLAN SHOWING THE SOD AREAS AS PART OF THE TOTAL | | | LANDSCAPE AREA AND PROVIDE THE TOTAL PERCENTAGE. ITEM | | | 6B DOES NOT APPLY. | | | ITEM 6B STILL DOES NOT APPLY. | | | 20. SATISFIED. PROVIDE ADDITIONAL INFORMATION ON SEA | | | PLUM TREE IN ORDER TO IDENTIFY IF IT IS A CULTIVAR OF | | | SEA GRAPE. | | | 21. SATISFIED. TOTAL NUMBER OF TREES PROVIDED NEEDS TO | | | BE SHOWN FROM THE PLANT LIST. CURRENT COUNT IS 92 TREES | | | PLUS 11 CABBAGE PALMS AT 3:1 FOR A TOTAL OF 95. SHOW | | | RELOCATED TREES ON THE PLANT LIST. SHOW OFFSITE TREES | | | ON THE PLANT LIST. IF REQUIRED TREES ARE NOT TO BE | | | PROVIDED ON SITE A WAVER MUST BE REQUESTED. | | | 22. SATISFIED. THE TREES PROVIDED ON THE AMENITY AREA | | | ON FLAGLER NEED TO BE SPREAD OUT TO PROVIDE SHADE FOR | | | PEDESTRIANS. | | | THE INTENT FOR THE OVERALL PEDESTRIAN PLAN FOR THE CITY | | | IS TO PROVIDE TREE CANOPY SHADE OVER PUBLIC AREAS AND | | | PEDESTRIAN SIDEWALKS. THE LARGE GAP ADJACENT TO THE | | | PLAZA DOES NOT MEET THIS INTENT. STAFF DOES NOT | | | RECOGNIZE HAVING THE TREES IN FRONT OF THE PLAZA AS A | | | SAFETY ISSUE, AS THE TREES WOULD MEET CPTED (CRIME | | | PREVENTION THROUGH ENVIRONMENTAL DESIGN) | | | RECOMMENDATIONS FOR THE TREE BRANCHING TO BE ABOVE 7 | | | FEET. PEDESTRIAN ENJOYMENT OF THE PUBLIC WALKWAY ALSO | | | OUTWEIGHS THE NEEDS OF THE PROPERTY OWNER TO EXPOSE THE | | | ARCHITECTURE OF THE BUILDING. | | | 23. PARTIALLY SATISFIED. TRANSPLANTED OAK TREE #1538 | | | APPEARS TO BE PROBLEMATIC IN THE SPECIFIED LOCATION | | | THAT IT WILL CONFLICT WITH THE BUILDING CONSTRUCTION. | | | TRANSPLANTED TREES MAY BE RELOCATED OFF SITE. THIS | | | APPEARS THIS COULD ALSO BE AN ISSUE WITH THE OTHER | | | RELOCATED TREES AND PALMS. | | | THE APPLICANT HAS A NOTE PLACED ON THE PLANS FOR | | | TEMPORARY STORAGE OF THE RELOCATED TREES. PROVIDE A | | | MORE DETAILED PLAN ON HOW THIS WILL BE IMPLEMENTED. THE | | | RELOCATED LIVE OAK IS SHOWN WITH PAVING PROPOSED OVER | | | THE ROOT SYSTEM AT ITS NEW LOCATION THAT WILL NOT BE | | | PRACTICAL OR HEALTHY FOR THE TREE. THE RENDERINGS SHOW | | | GRASS AREA. A SUSPENDED PAVING SYSTEM OR SOIL CELLS | | | MUST BE PROVIDED IF THE TREE IS TO BE SUSTAINABLE. | | | PROVIDE THE RELOCATION AND MANAGEMENT PLAN FOR THE | | | TREES BEFORE, DURING AND AFTER RELOCATION AND INCLUDE | | | IT ON THE TREE DISPOSITION PLAN. | | | ADDITIONAL COMMENTS 8/18/21: | | | 24. SATISFIED. TREE COUNT ON THE PLANT LIST OF 29 LIVE | | | OAK TREES DOES NOT MATCH THE PLAN SHOWING 30 TREES. | | | 25. PARTIALLY SATISFIED. THE SIDEWALK PROPOSED ALONG | | | OLIVE AVE. APPEARS TO BE TOO CLOSE TO EXISTING TREES | | | AND PALMS. PROVIDE MORE DETAIL ON HOW THIS WILL BE | | | ADDRESSED. | | | SITE PLAN DOES NOT MATCH ADJUSTED SIDEWALK ON THE | | | LANDSCAPE PLAN. | | | 26. SATISFIED. PROVIDE SCREENING HEDGES FOR ALL GROUND | | | MOUNTED EQUIPMENT INCLUDING WATER AND FIRE BACKFLOWS ON | | | THE CURRIE CRESCENT SIDE OF THE BUILDING. | | | 27. SATISFIED. VINES ARE SHOWN ON THE RENDERINGS ON THE | | | WALL OF THE EAST SIDE OF THE BUILDING, BUT NO PLANTS | | | ARE SHOWN ON THE LANDSCAPE PLAN. CORRECT TO SHOW THE | | | PLANTINGS. | | | 28. PARTIALLY SATISFIED. PROVIDE THE TOTAL MITIGATION | | | DUE FOR THE ON SITE TREES AND PALMS TO BE REMOVED. | | | ADONIDIA PALMS ARE CATEGORY 4 AND REQUIRE 50 SQ FT | | | CANOPY MITIGATION PER TRUNK, SPANISH CHERRY IS LISTED | | | UNDER CATEGORY 1 AND REQUIRES 300 SQ FT CANOPY | | | MITIGATION. PROVIDE THE LIST OF TREES ADDED TO THE SITE | | | AND ASSIGN THE CANOPY CREDITS BASED ON THE CATEGORY AND | | | PROVIDE THE TOTAL. | | | THERE ARE CORRECTIONS REQUIRED FOR THE ONSITE AND | | | OFFSITE MITIGATION CALCULATIONS. | | | 29. THE PLANTING PLANS FOR THE OFF SITE TREES NEED TO | | | BE REVISED TO SHOW THE FOLLOWING: | | | ? PARTIALLY SATISFIED. THE ROYAL PALMS BETWEEN THE | | | GREEN BUTTONWOOD TREES ARE NOT APPROPRIATE TO DUPLICATE | | | THE CURRENT LOOK OF THE TREE CANOPY AND THEY WOULD | | | PRESENT A SAFETY AND MAINTENANCE ISSUE OVER THE | | | PAVEMENT AND PARKING SPACES. REMOVE THE ROW OF PALMS | | | ADJACENT TO THE CURB. | | | THERE IS A GAP IN THE TREE CANOPY ON THE SOUTH SIDE OF | | | ACTION PL. ADJACENT TO THE ANGLED PARKING SPACES. GREEN | | | BUTTONWOOD TREES MUST BE PLACED ALONG THIS AREA | | | REPLACING THE ROYAL PALMS. | | | | | | ? SATISFIED. THERE IS NOT ENOUGH ROOM PROVIDED FOR THE | | | ROOT ZONE OF THE TREES. THE SIDEWALK NEEDS TO BE PUSHED | | | FARTHER AWAY FROM THE CURB (10 TO 12 FEET) ALLOWING | | | ENOUGH ROOT SPACE FOR THE TREES AND THE NARROWER | | | LANDSCAPE AREA ON THE BACK OF SIDEWALK. ROYAL PALMS | | | COULD BE PLACED IN THIS STRIP, BUT THEY WOULD HAVE TO | | | BE FAR ENOUGH AWAY FROM THE SIDEWALK TO AVOID FRONDS | | | DROPPING ON THE SIDEWALK. | | | ? PARTIALLY SATISFIED. PROVIDE THE TOTAL TREE CANOPY | | | MITIGATION DUE FOR THE REMOVED TREES AND PROVIDE THE | | | MITIGATION SQUARE FOOTAGE PROVIDED FOR THE NEW TREES | | | AND PALMS PROPOSED. IF THERE IS MITIGATION DUE, STAFF | | | WILL DISCUSS OPTIONS TO ADDRESS IT. | | | THERE ARE CORRECTIONS REQUIRED FOR THE ONSITE AND | | | OFFSITE MITIGATION CALCULATIONS. | | | | | | ? SATISFIED. INCREASING THE NUMBER OF GREEN BUTTONWOOD | | | TREES AND ROYAL PALMS WOULD INCREASE THE PUBLIC | | | BENEFITS AND THE AESTHETICS. | | | ? SATISFIED. EXPLAIN WHY THERE IS A GAP ON THE CORNER | | | OF OLIVE AND DIANA WITH NO TREE CANOPY PROVIDED. THIS | | | WAS A LOCATION SUGGESTED BY STAFF FOR THE RELOCATED | | | LIVE OAK TREE. | | | | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | | | | 2. THE APPLICANT, SUCCESSORS SHALL BE RESPONSIBLE FOR | | | THE PERMITTING AND INSTALLATION OF THE STREET TREES AND | | | RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH | | | THIS PETITION. | | | | | | 3. THE APPLICANT, SUCCESSORS SHALL BE RESPONSIBLE FOR | | | THE MAINTENANCE OF THE, ROAD RIGHT OF WAY | | | LANDSCAPING/TREES AND IRRIGATION. THIS WILL BE THROUGH | | | A SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
4 |
Status |
F |
Date |
08-19-2021 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
08-19-2021 |
Time |
10:17 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
08-19-2021 |
Time |
10:17 |
Sent To |
|
|
| Notes |
| 2021-08-19 10:17:40 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: FLAGLER TOWER Z21050015 | | | AUGUST 18, 2021 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | REVIEW: FLAGLER TOWERS 7/20/21 | | | 1. PREVIOUSLY SATISFIED | | | 2. PREVIOUSLY SATISFIED | | | 3. PREVIOUSLY SATISFIED | | | 4. SATISFIED. DUE TO THE CONSTRUCTION IMPACT ON THE | | | EXISTING MATURE TREES ON CITY PROPERTY ALONG DIANA PL. | | | REMOVE FICUS TREES AND REPLACE WITH 1 TO 1 CATEGORY | | | SHADE TREE. (SEE #5) | | | 7/27/21 RC: PLAN IS ALREADY IN PLACE BETWEEN PLANNING | | | AND PARKS AND REC. TO REPLACE FICUS WITH GREEN BUTTON | | | WOOD IN AGREEMENT WITH THE NORTON PARK PLACE CONDO. | | | APPLICANTS MAINTENANCE RESPONSIBILITY FOR TREES ON | | | NORTH SIDE OF DIANA PLACE. | | | 7/20/2021 | | | 6. 7/27/21 RC. MAKE THE FOLLOWING CORRECTIONS TO THE | | | TREE DISPOSITION LIST: | | | ? SATISFIED. SHOW THE DISPOSITION OF TREES #1479 ? | | | #1530. | | | ? SATISFIED. IDENTIFY TREE #1504 | | | ? SATISFIED. PROVIDE MITIGATION SQUARE FOOTAGE DUE FOR | | | TREES AND PALMS LISTED TO BE REMOVED. ON EXISTING TREES | | | ON SITE LIST AND EXISTING TREES ON ADJACENT SITE LIST. | | | 7. SATISFIED. SEE COMMENT #6 TREE #1479 ON TREE LIST | | | WILL NEED TO BE LISTED AS REMOVE TO REFLECT DEPICTION | | | ON THE MAP. PAGE D-1 | | | 8. SATISFIED. APPLICANT NEEDS PROVIDE LANDSCAPE PLANS | | | FOR POOL TERRACE PAGE LA 3-1. THE LANDSCAPING ON THE | | | AMENITIES LEVEL WILL BE APPROVED WITH PROJECT AND NEEDS | | | TO BE SUBMITTED. | | | 9. SATISFIED. LIVE OAK TREES ON FLAGLER APPEAR TO BE IN | | | CONFLICT WITH MAN HOLE COVERS AND STORM WATER LINE. | | | ADJUST LINE OR TREE LOCATIONS TO BE RESOLVE. | | | 10. PARTIALLY SATISFIED. LIVE OAK ON SOUTH SIDE BUFFER | | | APPEARS TO BE TOO CLOSE TO BUILDING AND ENTRY CANOPY | | | AND WILL OUTGROW ITS SPACE CREATING A CONFLICT WITH THE | | | BUILDING AND SHADE CANOPY. | | | THE TREES DO NOT APPEAR ON THE LANDSCAPE PLAN SHEET | | | LG-3.1. IF THIS IS IN ERROR, PROVIDE A MANAGEMENT PLAN | | | FOR THE MAINTENANCE OF THE TREES. | | | 11. SATISFIED. IN EAST SIDE COURTYARD THERE IS A STRAY | | | UNMARKED DIAGONAL LINE GOING ACROSS. IDENTIFY LINE OR | | | REMOVE IF IT?S NOT INTENTIONAL. | | | SENIOR LANDSCAPE PLANNER WILL RETURN ON 7/22 PLAN IS | | | SUBJECT TO HIS REVIEW | | | 7/27/21 RC. | | | 13. SATISFIED. ALL LANDSCAPE PLANS NEED TO BE ON AT | | | LEAST 1-20 SCALE PLAN AS THE CURRENT SCALE IS NOT | | | READABLE | | | 14. SATISFIED. SHOW OPEN SPACE SQUARE FOOTAGE FOR THE | | | NON-BUILDING AREA OF THE LOT. ADJUST OPEN SPACE DIAGRAM | | | ON SHEET LR-2. LANDSCAPING OVER BUILDING STRUCTURE IS | | | NOT COUNTED FOR OPEN SPACE. PROVIDE A DIAGRAM SHOWING | | | LANDSCAPED AREAS. | | | 15. SATISFIED. USING THE OPEN SPACE SQUARE FOOTAGE | | | CALCULATE THE NUMBER OF REQUIRED SHADE TREES, FLOWERING | | | TREES AND SHRUBS PER SECTION 94-442 (C) (2) B. ADD THE | | | TOTAL TREES REQUIRED FOR OPEN SPACE AND FOR MULTIFAMILY | | | REQUIREMENT AND SHOW THE TOTAL REQUIRED TREES. | | | 16. PARTIALLY SATISFIED. SHOW THE PROVIDED LINEAR FEET | | | OF LANDSCAPING FOR THE BUILDING PERIMETER. | | | ABOVE GROUND POTS AND PLANTERS MAY NOT BE COUNTED AS | | | PERIMETER LANDSCAPE. THERE ARE AREAS ADJACENT TO THE | | | BUILDING ON THE OLIVE SIDE AND SHOWN AS PLANTINGS THAT | | | DO NOT APPEAR AS OPENINGS IN THE PAVED AREAS. CLEARLY | | | IDENTIFY THESE AREAS AND RECALCULATE THE PERIMETER | | | LANDSCAPE. | | | 17. SATISFIED. ADD A NATIVE COLUMN TO THE PLANT | | | SCHEDULE SO STAFF CAN VERIFY REQUIREMENTS. | | | 18. SATISFIED. MAGNOLIA MAY BE COUNTED AS NATIVE. | | | 19. PARTIALLY SATISFIED. FLORIDA FRIENDLY REQUIREMENTS. | | | PROVIDE AN AREA PLAN SHOWING THE SOD AREAS AS PART OF | | | THE TOTAL LANDSCAPE AREA AND PROVIDE THE TOTAL | | | PERCENTAGE. ITEM 6B DOES NOT APPLY. | | | ITEM 6B STILL DOES NOT APPLY. | | | 20. SATISFIED. PROVIDE ADDITIONAL INFORMATION ON SEA | | | PLUM TREE IN ORDER TO IDENTIFY IF IT IS A CULTIVAR OF | | | SEA GRAPE. | | | 21. SATISFIED. TOTAL NUMBER OF TREES PROVIDED NEEDS TO | | | BE SHOWN FROM THE PLANT LIST. CURRENT COUNT IS 92 TREES | | | PLUS 11 CABBAGE PALMS AT 3:1 FOR A TOTAL OF 95. SHOW | | | RELOCATED TREES ON THE PLANT LIST. SHOW OFFSITE TREES | | | ON THE PLANT LIST. IF REQUIRED TREES ARE NOT TO BE | | | PROVIDED ON SITE A WAVER MUST BE REQUESTED. | | | 22. NOT SATISFIED. THE TREES PROVIDED ON THE AMENITY | | | AREA ON FLAGLER NEED TO BE SPREAD OUT TO PROVIDE SHADE | | | FOR PEDESTRIANS. | | | THE INTENT FOR THE OVERALL PEDESTRIAN PLAN FOR THE CITY | | | IS TO PROVIDE TREE CANOPY SHADE OVER PUBLIC AREAS AND | | | PEDESTRIAN SIDEWALKS. THE LARGE GAP ADJACENT TO THE | | | PLAZA DOES NOT MEET THIS INTENT. STAFF DOES NOT | | | RECOGNIZE HAVING THE TREES IN FRONT OF THE PLAZA AS A | | | SAFETY ISSUE, AS THE TREES WOULD MEET CPTED (CRIME | | | PREVENTION THROUGH ENVIRONMENTAL DESIGN) | | | RECOMMENDATIONS FOR THE TREE BRANCHING TO BE ABOVE 7 | | | FEET. PEDESTRIAN ENJOYMENT OF THE PUBLIC WALKWAY ALSO | | | OUTWEIGHS THE NEEDS OF THE PROPERTY OWNER TO EXPOSE THE | | | ARCHITECTURE OF THE BUILDING. | | | 23. PARTIALLY SATISFIED. TRANSPLANTED OAK TREE #1538 | | | APPEARS TO BE PROBLEMATIC IN THE SPECIFIED LOCATION | | | THAT IT WILL CONFLICT WITH THE BUILDING CONSTRUCTION. | | | TRANSPLANTED TREES MAY BE RELOCATED OFF SITE. THIS | | | APPEARS THIS COULD ALSO BE AN ISSUE WITH THE OTHER | | | RELOCATED TREES AND PALMS. | | | THE APPLICANT HAS A NOTE PLACED ON THE PLANS FOR | | | TEMPORARY STORAGE OF THE RELOCATED TREES. PROVIDE A | | | MORE DETAILED PLAN ON HOW THIS WILL BE IMPLEMENTED. THE | | | RELOCATED LIVE OAK IS SHOWN WITH PAVING PROPOSED OVER | | | THE ROOT SYSTEM AT ITS NEW LOCATION THAT WILL NOT BE | | | PRACTICAL OR HEALTHY FOR THE TREE. THE RENDERINGS SHOW | | | GRASS AREA. A SUSPENDED PAVING SYSTEM OR SOIL CELLS | | | MUST BE PROVIDED IF THE TREE IS TO BE SUSTAINABLE. | | | ADDITIONAL COMMENTS 8/18/21: | | | 24. TREE COUNT ON THE PLANT LIST OF 29 LIVE OAK TREES | | | DOES NOT MATCH THE PLAN SHOWING 30 TREES. | | | 25. THE SIDEWALK PROPOSED ALONG OLIVE AVE. APPEARS TO | | | BE TOO CLOSE TO EXISTING TREES AND PALMS. PROVIDE MORE | | | DETAIL ON HOW THIS WILL BE ADDRESSED. | | | 26. PROVIDE SCREENING HEDGES FOR ALL GROUND MOUNTED | | | EQUIPMENT INCLUDING WATER AND FIRE BACKFLOWS ON THE | | | CURRIE CRESCENT SIDE OF THE BUILDING. | | | 27. VINES ARE SHOWN ON THE RENDERINGS ON THE WALL OF | | | THE EAST SIDE OF THE BUILDING, BUT NO PLANTS ARE SHOWN | | | ON THE LANDSCAPE PLAN. CORRECT TO SHOW THE PLANTINGS. | | | 28. PROVIDE THE TOTAL MITIGATION DUE FOR THE ON SITE | | | TREES AND PALMS TO BE REMOVED. ADONIDIA PALMS ARE | | | CATEGORY 4 AND REQUIRE 50 SQ FT CANOPY MITIGATION PER | | | TRUNK, SPANISH CHERRY IS LISTED UNDER CATEGORY 1 AND | | | REQUIRES 300 SQ FT CANOPY MITIGATION. PROVIDE THE LIST | | | OF TREES ADDED TO THE SITE AND ASSIGN THE CANOPY | | | CREDITS BASED ON THE CATEGORY AND PROVIDE THE TOTAL. | | | 29. THE PLANTING PLANS FOR THE OFF SITE TREES NEED TO | | | BE REVISED TO SHOW THE FOLLOWING: | | | ? THE ROYAL PALMS BETWEEN THE GREEN BUTTONWOOD TREES | | | ARE NOT APPROPRIATE TO DUPLICATE THE CURRENT LOOK OF | | | THE TREE CANOPY AND THEY WOULD PRESENT A SAFETY AND | | | MAINTENANCE ISSUE OVER THE PAVEMENT AND PARKING SPACES. | | | REMOVE THE ROW OF PALMS ADJACENT TO THE CURB. | | | ? THERE IS NOT ENOUGH ROOM PROVIDED FOR THE ROOT ZONE | | | OF THE TREES. THE SIDEWALK NEEDS TO BE PUSHED FARTHER | | | AWAY FROM THE CURB (10 TO 12 FEET) ALLOWING ENOUGH ROOT | | | SPACE FOR THE TREES AND THE NARROWER LANDSCAPE AREA ON | | | THE BACK OF SIDEWALK. ROYAL PALMS COULD BE PLACED IN | | | THIS STRIP, BUT THEY WOULD HAVE TO BE FAR ENOUGH AWAY | | | FROM THE SIDEWALK TO AVOID FRONDS DROPPING ON THE | | | SIDEWALK. | | | ? PROVIDE THE TOTAL TREE CANOPY MITIGATION DUE FOR THE | | | REMOVED TREES AND PROVIDE THE MITIGATION SQUARE FOOTAGE | | | PROVIDED FOR THE NEW TREES AND PALMS PROPOSED. IF THERE | | | IS MITIGATION DUE, STAFF WILL DISCUSS OPTIONS TO | | | ADDRESS IT. | | | ? INCREASING THE NUMBER OF GREEN BUTTONWOOD TREES AND | | | ROYAL PALMS WOULD INCREASE THE PUBLIC BENEFITS AND THE | | | AESTHETICS. | | | ? EXPLAIN WHY THERE IS A GAP ON THE CORNER OF OLIVE AND | | | DIANA WITH NO TREE CANOPY PROVIDED. THIS WAS A LOCATION | | | SUGGESTED BY STAFF FOR THE RELOCATED LIVE OAK TREE. | | | | | | | | | CONDITION OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | | | | 2. THE APPLICANT, SUCCESSORS SHALL BE RESPONSIBLE FOR | | | THE PERMITTING AND INSTALLATION OF THE STREET TREES AND | | | RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH | | | THIS PETITION. | | | | | | 3. THE APPLICANT, SUCCESSORS SHALL BE RESPONSIBLE FOR | | | THE MAINTENANCE OF THE, ROAD RIGHT OF WAY | | | LANDSCAPING/TREES AND IRRIGATION. THIS WILL BE THROUGH | | | A SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
3 |
Status |
F |
Date |
07-27-2021 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
07-27-2021 |
Time |
11:37 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
07-27-2021 |
Time |
11:37 |
Sent To |
|
|
| Notes |
| 2021-07-27 11:41:16 | MEMO TO FILE | | | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: FLAGLER TOWER Z21050015 | | | JULY 27, 2021 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | REVIEW: FLAGLER TOWERS 7/20/21 | | | 1. SATISFIED THE PLEACHING OR SHAPING OF TREES IS | | | PROHIBITED BY THE CITY OF WEST PALM BEACH AND IS | | | CONSIDERED TREE ABUSE. STANDARDS FOR TRIMMING SHALL BE | | | PERFORMED IN ACCORDANCE WITH THE LATEST PRUNING | | | STANDARDS FOR SHADE TREES RECOMMENDED BY THE NATIONAL | | | ARBORIST ASSOCIATION. 94-446 B 1-5 | | | | | | 2. SATISFIED MULTIPLE TREES ALONG CURRIE CRESCENT ARE | | | SHOWN TO BE PLANTED ON THE WATER AND STORMWATER LINES. | | | ADJUST PLANTINGS IN CONFLICT WITH UTILITIES. | | | | | | 3. SATISFIED PROVIDE THE CALCULATION FOR THE | | | INTERRUPTIONS IN THE LANDSCAPE BUFFER ON THE PROPERTY | | | LINES. UPDATE/ADJUST TREE COUNT CALCULATIONS BUFFER | | | 1/30 FEET. | | | | | | A. FLAGLER ? 9? UNABLE TO TELL TREE COUNT. | | | B. SOUTH DIANA PL ? UPDATE TO REFLECT THAT 19 TREES ARE | | | REQUIRED (NEED TO ROUND UP FOR ANY FRACTION OF A TREE). | | | INCLUDING THE PALMS ON THE CORNER THE SOUTH SIDE BUFFER | | | REQUIREMENT APPEARS TO BE MET . | | | C. OLIVE ? 7? THE LANDSCAPE BUFFER TREES ARE TO BE | | | INSTALLED ON- SITE, THEY CAN?T BE PLANTING ON THE RIGHT | | | - OF ? WAY AND COUNT TOWARD MEETING CODE. | | | D. CURRIE CRESCENT- 9? UNABLE TO TELL. AT LEAST ONE | | | SHADE TREE SHALL BE PLANTED EVERY LINEAR FEET OR | | | PORTION THEREOF. RELOCATED PALMS CANNOT ALL BE PLANTED | | | IN THE SAME AREA DUE TO CODE SHADE TREE REQUIREMENTS. | | | SEC. 94-443 A. ? F. | | | E. NORTH PROPERTY LINE ? APPEARS TO HAVE 12 SEA GRAPE. | | | REQUIREMENT MET. | | | | | | | | | | | | 4. PARTIALLY SATISFIED DUE TO THE CONSTRUCTION IMPACT | | | ON THE EXISTING MATURE TREES ON CITY PROPERTY ALONG | | | DIANA PL. REMOVE FICUS TREES AND REPLACE WITH 1 TO 1 | | | CATEGORY SHADE TREE. (SEE #5) | | | 7/27/21 RC: PLAN IS ALREADY IN PLACE BETWEEN PLANNING | | | AND PARKS AND REC. TO REPLACE FICUS WITH GREEN BUTTON | | | WOOD IN AGREEMENT WITH THE NORTON PARK PLACE CONDO. | | | APPLICANTS MAINTENANCE RESPONSIBILITY FOR TREES ON | | | NORTH SIDE OF DIANA PLACE. | | | | | | | | | 7/20/2021 | | | 6. 7/27/21 RC. MAKE THE FALLOWING CORRECTIONS TO THE | | | TREE DISPOSITION LIST: | | | ? SHOW THE DISPOSITION OF TREES #1479 ? #1530. | | | ? IDENTIFY TREE #1504 | | | ? PROVIDE MITIGATION SQUARE FOOTAGE DUE FOR TREES AND | | | PALMS LISTED TO BE REMOVED. ON EXISTING TREES ON SITE | | | LIST AND EXISTING TREES ON ADJACENT SITE LIST . | | | | | | | | | 7. SEE COMMENT #6 TREE #1479 ON TREE LIST WILL NEED TO | | | BE LISTED AS REMOVE TO REFLECT DEPICTION ON THE MAP. | | | PAGE D-1 | | | | | | 8. APPLICANT NEEDS PROVIDE LANDSCAPE PLANS FOR POOL | | | TERRACE PAGE LA 3-1. THE LANDSCAPING ON THE AMENITIES | | | LEVEL WILL BE APPROVED WITH PROJECT AND NEEDS TO BE | | | SUBMITTED. | | | | | | 9. LIVE OAK TREES ON FLAGLER APPEAR TO BE IN CONFLICT | | | WITH MAN HOLE COVERS AND STORM WATER LINE. ADJUST LINE | | | OR TREE LOCATIONS TO BE RESOLVE. | | | | | | 10. LIVE OAK ON SOUTH SIDE BUFFER APPEARS TO BE TO | | | CLOSE TO BUILDING AND ENTRY CANOPY AND WILL OUTGROW ITS | | | SPACE CREATING A CONFLICT WITH THE BUILDING AND SHADE | | | CANOPY. | | | | | | 11. IN EAST SIDE COURTYARD THERE IS A STRAY UNMARKED | | | DIAGONAL LINE GOING ACROSS. IDENTIFY LINE OR REMOVE IF | | | IT?S NOT INTENTIONAL. | | | | | | SENIOR LANDSCAPE PLANNER WILL RETURN ON 7/22 PLAN IS | | | SUBJECT TO HIS REVIEW | | | 7/27/21 RC. | | | 13. ALL LANDSCAPE PLANS NEED TO BE ON AT LEAST 1-20 | | | SCALE PLAN AS THE CURRENT SCALE IS NOT READABLE | | | 14. SHOW OPEN SPACE SQUARE FOOTAGE FOR THE NON-BUILDING | | | AREA OF THE LOT. ADJUST OPEN SPACE DIAGRAM ON SHEET | | | LR-2. LANDSCAPING OVER BUILDING STRUCTURE IS NOT | | | COUNTED FOR OPEN SPACE. PROVIDE A DIAGRAM SHOWING | | | LANDSCAPED AREAS. | | | 15. USING THE OPEN SPACE SQUARE FOOTAGE CALCULATE THE | | | NUMBER OF REQUIRED SHADE TREES, FLOWERING TREES AND | | | SHRUBS PER SECTION 94-442 (C) (2) B. ADD THE TOTAL | | | TREES REQUIRED FOR OPEN SPACE AND FOR MULTIFAMILY | | | REQUIREMENT AND SHOW THE TOTAL REQUIRED TREES. | | | 16. SHOW THE PROVIDED LINIER FEET OF LANDSCAPING FOR | | | THE BUILDING PERIMETER. | | | 17. ADD A NATIVE COLUMN TO THE PLANT SCHEDULE SO STAFF | | | CAN VERIFY REQUIREMENTS. | | | 18. MAGNOLIA MAY BE COUNTED AS NATIVE. | | | 19. FLORIDA FRIENDLY REQUIREMENTS. PROVIDE AN AREA PLAN | | | SHOWING THE SOD AREAS AS PART OF THE TOTAL LANDSCAPE | | | AREA AND PROVIDE THE TOTAL PERCENTAGE. ITEM 6B DOES NOT | | | APPLY. | | | 20. PROVIDE ADDITIONAL INFORMATION ON SEA PLUM TREE IN | | | ORDER TO IDENTIFY IF IT IS A CULTIVAR OF SEA GRAPE. | | | 21. TOTAL NUMBER OF TREES PROVIDED NEEDS TO BE SHOWN | | | FROM THE PLANT LIST. CURRENT COUNT IS 92 TREES PLUS 11 | | | CABBAGE PALMS AT 3:1 FOR A TOTAL OF 95. SHOW RELOCATED | | | TREES ON THE PLANT LIST. SHOW OFFSITE TREES ON THE | | | PLANT LIST. IF REQUIRED TREES ARE NOT TO BE PROVIDED ON | | | SITE A WAVER MUST BE REQUESTED. | | | 22. THE TREES PROVIDED ON THE AMENITY AREA ON FLAGLER | | | NEED TO BE SPREAD OUT TO PROVIDE SHADE FOR PEDESTRIANS. | | | 23. TRANSPLANTED OAK TREE #1538 APPEARS TO BE | | | PROBLEMATIC IN THE SPECIFIED LOCATION THAT IT WILL | | | CONFLICT WITH THE BUILDING CONSTRUCTION. TRANSPLANTED | | | TREES MAYBE RELOCATED OFF SITE. THIS APPEARS THIS COULD | | | ALSO BE AN ISSUE WITH THE OTHER RELOCATED TREES AND | | | PALMS. | | | | | | CONDITION OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | | | | 2. THE APPLICANT, SUCCESSORS SHALL BE RESPONSIBLE FOR | | | THE PERMITTING AND INSTALLATION OF THE STREET TREES AND | | | RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH | | | THIS PETITION. | | | | | | 3. THE APPLICANT, SUCCESSORS SHALL BE RESPONSIBLE FOR | | | THE MAINTENANCE OF THE, ROAD RIGHT OF WAY | | | LANDSCAPING/TREES AND IRRIGATION. THIS WILL BE THROUGH | | | A SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
F |
Date |
07-19-2021 |
|
|
Cont ID |
|
| Sent By |
aburnett |
Date |
07-19-2021 |
Time |
11:53 |
Rev Time |
0.00 |
| Received By |
aburnett |
Date |
07-19-2021 |
Time |
11:53 |
Sent To |
|
|
| Notes |
| 2021-07-19 11:54:58 | ANDREW BURNETT, LANDSCAPE PLANNER 561-822-1562 | | | REVIEW: FLAGLER TOWERS 7/20/21 | | | 1. SATISFIED THE PLEACHING OR SHAPING OF TREES IS | | | PROHIBITED BY THE CITY OF WEST PALM BEACH AND IS | | | CONSIDERED TREE ABUSE. STANDARDS FOR TRIMMING SHALL BE | | | PERFORMED IN ACCORDANCE WITH THE LATEST PRUNING | | | STANDARDS FOR SHADE TREES RECOMMENDED BY THE NATIONAL | | | ARBORIST ASSOCIATION. 94-446 B 1-5 | | | | | | 2. SATISFIED MULTIPLE TREES ALONG CURRIE CRESCENT ARE | | | SHOWN TO BE PLANTED ON THE WATER AND STORMWATER LINES. | | | ADJUST PLANTINGS IN CONFLICT WITH UTILITIES. | | | | | | 3. SATISFIED PROVIDE THE CALCULATION FOR THE | | | INTERRUPTIONS IN THE LANDSCAPE BUFFER ON THE PROPERTY | | | LINES. UPDATE/ADJUST TREE COUNT CALCULATIONS BUFFER | | | 1/30 FEET. | | | | | | A. FLAGLER ? 9? UNABLE TO TELL TREE COUNT. | | | B. SOUTH DIANA PL ? UPDATE TO REFLECT THAT 19 TREES ARE | | | REQUIRED (NEED TO ROUND UP FOR ANY FRACTION OF A TREE). | | | INCLUDING THE PALMS ON THE CORNER THE SOUTH SIDE BUFFER | | | REQUIREMENT APPEARS TO BE MET . | | | C. OLIVE ? 7? THE LANDSCAPE BUFFER TREES ARE TO BE | | | INSTALLED ON- SITE, THEY CAN?T BE PLANTING ON THE RIGHT | | | - OF ? WAY AND COUNT TOWARD MEETING CODE. | | | D. CURRIE CRESCENT- 9? UNABLE TO TELL. AT LEAST ONE | | | SHADE TREE SHALL BE PLANTED EVERY LINEAR FEET OR | | | PORTION THEREOF. RELOCATED PALMS CANNOT ALL BE PLANTED | | | IN THE SAME AREA DUE TO CODE SHADE TREE REQUIREMENTS. | | | SEC. 94-443 A. ? F. | | | E. NORTH PROPERTY LINE ? APPEARS TO HAVE 12 SEA GRAPE. | | | REQUIREMENT MET. | | | | | | | | | | | | 4. PARTIALLY SATISFIED DUE TO THE CONSTRUCTION IMPACT | | | ON THE EXISTING MATURE TREES ON CITY PROPERTY ALONG | | | DIANA PL. REMOVE FICUS TREES AND REPLACE WITH 1 TO 1 | | | CATEGORY SHADE TREE. (SEE #5) | | | | | | 7/20/2021 | | | 5. THE USE OF LIVE OAK OR MAHOGANY WOULD BE PREFERRED | | | FOR SUGGESTED REMOVAL AND REPLACEMENT OF FICUS. ZONING | | | WILL CONDUCT ADDITIONAL INVESTIGATION ON FEASIBILITY OF | | | REMOVAL, REPLACEMENT AND MAINTENANCE RESPONSIBILITIES | | | OF TREES ON ACTAEON PL. | | | | | | 6. UPDATE TREE DISPOSITION PLAN TO REFLECT PROPOSED | | | TREE TO BE REMOVED ON ACTAEON. | | | | | | 7. TREE #1479 ON TREE LIST WILL NEED TO BE LISTED AS | | | REMOVE TO REFLECT DEPICTION ON THE MAP. PAGE D-1 | | | | | | 8. APPLICANT NEEDS PROVIDE LANDSCAPE PLANS FOR POOL | | | TERRACE PAGE LA 3-1 | | | | | | 9. LIVE OAK TREES ON FLAGLER APPEAR TO BE IN CONFLICT | | | WITH MAN HOLE COVERS AND STORM WATER LINE. ADJUST LINE | | | OR TREE LOCATIONS TO RESOLVE | | | | | | 10. LIVE OAK ON SOUTH SIDE BUFFER APPEARS TO BE TO | | | CLOSE TO BUILDING AND ENTRY CANOPY AND WILL OUT GROW | | | ITS SPACE CREATING A CONFLICT WITH THE BUILDING AND | | | SHADE CANOPY. THIS COULD BE A BETTER LOCATION FOR LARGE | | | SCALE PALM ..... ROYAL, BISMARK, MEDJOOL. | | | | | | 11. UNABLE TO FIND INFORMATION ON PLAN REGARDING | | | PLANTING SOIL | | | | | | 12. IN EAST SIDE COURTYARD THERE IS A STRAY UNMARKED | | | DIAGONAL LINE GOING ACROSS . IDENTIFY LINE OR REMOVE IF | | | ITS NOT INTENTIONAL. | | | | | | SEINOR LANDSCAPE PLANNER WILL RETURN ON 7/22 PLAN IS | | | SUBJECT TO HIS REVIEW | | | | | | CONDITION OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | | | | 2. THE APPLICANT, SUCCESSORS SHALL BE RESPONSIBLE FOR | | | THE PERMITTING AND INSTALLATION OF THE STREET TREES AND | | | RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH | | | THIS PETITION. | | | | | | 3. THE APPLICANT, SUCCESSORS SHALL BE RESPONSIBLE FOR | | | THE MAINTENANCE OF THE, ROAD RIGHT OF WAY | | | LANDSCAPING/TREES AND IRRIGATION. THIS WILL BE THROUGH | | | A SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
06-07-2021 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
06-07-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-06-07 11:49:11 | 1. THE PLEACHING OR SHAPING OF TREES IS PROHIBITED BY | | | THE CITY OF WEST PALM BEACH AND IS CONSIDERED TREE | | | ABUSE. STANDARDS FOR TRIMMING SHALL BE PERFORMED IN | | | ACCORDANCE WITH THE LATEST PRUNING STANDARDS FOR SHADE | | | TREES RECOMMENDED BY THE NATIONAL ARBORIST ASSOCIATION. | | | 94-446 B 1-5 | | | | | | 2. MULTIPLE TREES ALONG CURRIE CRESCENT ARE SHOWN TO BE | | | PLANTED ON THE WATER AND STORMWATER LINES. ADJUST | | | PLANTINGS IN CONFLICT WITH UTILITIES. | | | | | | 3. PROVIDE THE CALCULATION FOR THE INTERRUPTIONS IN THE | | | LANDSCAPE BUFFER ON THE PROPERTY LINES. UPDATE/ADJUST | | | TREE COUNT CALCULATIONS BUFFER 1/30 FEET. | | | | | | A. FLAGLER ? 9? UNABLE TO TELL TREE COUNT. | | | B. SOUTH DIANA PL ? UPDATE TO REFLECT THAT 19 TREES ARE | | | REQUIRED (NEED TO ROUND UP FOR ANY FRACTION OF A TREE). | | | INCLUDING THE PALMS ON THE CORNER THE SOUTH SIDE BUFFER | | | REQUIREMENT APPEARS TO BE MET . | | | C. OLIVE ? 7? THE LANDSCAPE BUFFER TREES ARE TO BE | | | INSTALLED ON- SITE, THEY CAN?T BE PLANTING ON THE RIGHT | | | - OF ? WAY AND COUNT TOWARD MEETING CODE. | | | D. CURRIE CRESCENT- 9? UNABLE TO TELL. AT LEAST ONE | | | SHADE TREE SHALL BE PLANTED EVERY LINEAR FEET OR | | | PORTION THEREOF. RELOCATED PALMS CANNOT ALL BE PLANTED | | | IN THE SAME AREA DUE TO CODE SHADE TREE REQUIREMENTS. | | | SEC. 94-443 A. ? F. | | | E. NORTH PROPERTY LINE ? APPEARS TO HAVE 12 SEA GRAPE. | | | REQUIREMENT MET. | | | | | | | | | | | | 4. DUE TO THE CONSTRUCTION IMPACT ON THE EXISTING | | | MATURE TREES ON CITY PROPERTY ALONG DIANA PL. REMOVE | | | FICUS TREES AND REPLACE WITH 1 TO 1 CATEGORY SHADE | | | TREE. | | | | | | | | | ANDREW BURNETT | | | 561-822-1562 |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
2 |
Status |
P |
Date |
07-01-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
07-01-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
07-01-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-07-01 12:38:29 | PASSED WITH A PRIVISO FOR THE ROLL-OUT CONTAINERS TO BE | | | FRONT LOAD TYPE. | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 | | | |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
F |
Date |
06-07-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
06-07-2021 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
06-07-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-06-07 14:31:15 | PLEASE PROVIDE THE FOLLOWINGS: | | | 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID | | | WASTE VOLUME PRODUCED ALONG WITH THE SIZE, TYPE AND | | | QUANTITY OF THE CONTAINER (I.E. DUMPSTER/COMPACTOR) | | | THAT WILL BE UTILIZED THAT WILL BE UTILIZED FOR THE | | | SANITATION SERVICE. | | | 2- DUMPSTER ENCLOSURE DETAIL. FOR A FREESTANDING SITE | | | DUMPSTER ENCLOSURE, THE ENCLOSURE SHALL COMPLY WITH THE | | | LATEST REVISION OF CITY OF WEST PALM BEACH GENERAL | | | CONSTRUCTION-GARBAGE ENCLOSURE STANDARD, GC-7. | | | 3- AUTOTURN EXHIBIT (DYNAMIC ENVELOPE AND THE VEHICLES | | | WHEEL PATH) FOR THE SANITATION SERVICE, FRONT LOADER | | | TRUCK WITH THE FOLLOWING SPECS: | | | - DUAL AXLES | | | - TRUCK LENGTH: 35 FT | | | - TRUCK WIDTH: 11 FT | | | - TURNING RADIUS: | | | - SAE TURNING RADIUS: 32.5 FT | | | - CURB-TO-CURB DIAMETER: 74 FT | | | - WALL-TO-WALL DIAMETER: 86.3 FT | | | 4- DESIGNATED LOCATION FOR THE BULK ITEM PICK UP AND | | | RECYCLING CONTAINERS | | | | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
6 |
Status |
P |
Date |
11-05-2021 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
11-05-2021 |
Time |
13:47 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
11-05-2021 |
Time |
13:50 |
Sent To |
|
|
| Notes |
| 2021-11-05 13:50:10 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | OCTOBER 29, 2021 PLAN SUBMITTAL. | | | | | | 1. [CONDITION OF SITE PLAN APPROVAL - COORDINATE THE | | | GRADING OF CURRIE CRESCENT WITH THE FORTE RESIDENCES | | | DEVELOPMENT.] PROPOSED GRADES AT EAST CURB OF CURRIE | | | CRESCENT AT THE INTERFACE BETWEEN THE 9/8/21 FORTE | | | RESIDENCES GRADING PLAN AND THE 9/13/21 FLAGLER TOWERS | | | GRADING PLAN APPEAR TO MATCH. [SEE NEW COMMENT 31 | | | BELOW] | | | | | | 2. [SATISFIED] FLAGLER TOWERS GRADING PLAN SHOWS A SPOT | | | GRADE OF 11.07 AT THE PROPOSED SANITARY SEWER MANHOLE. | | | THIS GRADE WILL CAUSE WATER TO POND IN THE DRIVEWAY | | | GUTTER TO THE NORTH (WHICH HAS SPOT GRADES OF 10.93 ON | | | THE SOUTH SIDE AND 11.18 ME ON THE NORTH SIDE OF THE | | | DRIVEWAY APRON. | | | | | | 3. [SATISFIED] MAINTAIN CROWN CROSS SECTION OF CURRIE | | | CRESCENT. | | | | | | 4. [SATISFIED] REQUESTED DIMENSIONS WERE ONLY PROVIDE | | | FOR SECTIONS B-B, C-C, D-D, H-H, AND J-J. PREVIOUS | | | COMMENT: FOR THE CROSS SECTIONS ON SHEET C-501, PROVIDE | | | DIMENSIONS FROM PROPERTY LINE/RIGHT OF WAY LINE TO | | | VALLEY GUTTER OR BACK OF SIDEWALK. | | | | | | 5. [SATISFIED] SIDEWALK ACROSS WEST DRIVEWAY TO CURRIE | | | CRESCENT SHALL SLOPE TOWARD THE STREET. THE HIGH POINT | | | OF THE DRIVEWAY SHALL BE SUFFICIENT TO PREVENT | | | STORMWATER RUNOFF FROM THE RIGHT OF WAY FROM FLOWING | | | DOWN THE DRIVEWAY TOWARD THE BUILDING AND AT THE SAME | | | TIME MINIMIZE THE AREA OF THE DRIVEWAY SLOPING TOWARD | | | THE ROAD (I.E. MAXIMIZE THE DRIVEWAY SLOPE BETWEEN THE | | | HIGH POINT AND THE BACK OF THE SIDEWALK.)] SUGGEST | | | SLOPING THE SIDEWALK PORTION OF THE DRIVEWAY SHOWN IN | | | SECTION B-B TOWARD THE VALLEY GUTTER. THE GRADES SHOWN | | | ON SHEET C-500 FOR THE DRIVEWAY WITH SECTION B-B (10.72 | | | AT EP AND 10.70/10.84 AT BOW ACROSS DRIVEWAY) DO NOT | | | MATCH THE GRADES SHOWN ON SECTION B-B ON SHEET C-501 | | | (11.00 AT EP AND 11.04 AT BACK OF CROSSWALK [HIGH POINT | | | OF DRIVEWAY]). SECTION B-B SHOWS LESS THAN 1/2 INCH | | | DROP (0.04 FT) BETWEEN BACK OF WALK AND EP. THIS SHORT | | | RISE WILL NOT STOP MUCH ROADWAY STORMWATER RUNOFF FROM | | | FLOWING DOWN THE DRIVEWAY. THE GRADING PLAN DOESN?T | | | APPEAR TO SUPPORT ALL OF THE CROSSWALK/SIDEWALK SLOPING | | | TOWARD THE ROAD. | | | | | | 6. [SATISFIED - SLOPES REMOVED FROM SHEET G-203.] | | | PREVIOUS COMMENT: SECTION D-D SHOWS 13.5% SLOPE EAST OF | | | THE PROPERTY LINE. SHEET G-203 SHOWS 7.5% RAMP UP. | | | PREVIOUS COMMENT: COORDINATE THE SLOPES SHOWN FOR THE | | | DRIVEWAYS WITH THE ARCHITECTURAL PLANS. FOR EXAMPLE, | | | SECTION C-C SHOWS 3.4% SLOPE BETWEEN THE BUILDING AND | | | VALLEY GUTTER. SHEET A-101 SHOWS THE DRIVEWAY AT 7.5% | | | SLOPE. | | | | | | 7. [SATISFIED] SECTION D-D: PROVIDE SIDEWALK AREA WITH | | | SLOPE NO STEEPER THAN 2%. | | | | | | 8. [SATISFIED] SECTION E-E: CORRECT LABELS FOR ROAD | | | CENTERLINE AND PROPERTY LINE. | | | | | | 9. [SATISFIED] [CONDITION OF SITE PLAN APPROVAL - | | | PARALLEL PARKING SPACES ON DIANA PLACE SHALL SLOPE TO | | | THE PROPOSED NORTH TYPE 'D' CURB AT MINIMUM 2% CROSS | | | SLOPE. LANDSCAPE AREA BETWEEN BACK CURB AND 10 FT | | | SIDEWALK SHALL HAVE 4:1 OR FLATTER SLOPE. THE 6.8 FT | | | LONG SIDEWALK CONNECTORS BETWEEN 10 FT WIDE SIDEWALK | | | AND THE PROPERTY LINE CAN SLOPE UP TO 7.2% (EQUATES TO | | | LESS THAN 0.5 FT DROP) WITHOUT NEEDING HANDRAILS. | | | DRAINAGE STRUCTURE AND STORM PIPE WILL BE NEEDED AT | | | EAST END OF PARALLEL PARKING SPACES TO COLLECT | | | STORMWATER RUNOFF AND CONVEY TO EXISTING DRAINAGE | | | STRUCTURE.] (PREVIOUS COMMENT- GRADING OF THE AREA | | | BETWEEN THE SOUTH PROPERTY LINE AND THE CENTER LINE OF | | | DIANA PLACE CAN BE A CONDITION OF SITE PLAN APPROVAL TO | | | BE WORKED OUT DURING ENGINEERING PERMIT SUBMITTAL.] | | | REVISED COMMENT: THE GRADING BETWEEN THE ROAD | | | CENTERLINE AND R/W, AS SHOWN ON SECTIONS H-H THROUGH | | | J-J NEEDS FURTHER REFINEMENT. SINCE STEPS ARE BEING | | | PROPOSED TO MAKE UP THE VERTICAL DISTANCE BETWEEN THE | | | FINISHED FLOORS OF THE HOUSING UNITS AND THE DIANA | | | PLACE PARCEL, MAINTAIN NORMAL CROWN FOR DIANA PLACE AND | | | SLOPE THE PARKING TOWARD THE PROPOSED CURB LINE. FOR | | | SECTION J-J, THE LANDSCAPE AREA SHOULD MEET THE TOP OF | | | CURB. FOR SECTION J-J, SLOPE THE SIDEWALK TOWARD THE | | | ROAD AND INSTALL A CATCH BASIN IN THE SMALL LANDSCAPE | | | AREA AND CONNECT INTO THE CURB INLET ON THE STREET. | | | PROVIDE SECTION(S) ON EITHER SIDE OF THE STEPS TO SHOW | | | HOW THE AREA BETWEEN THE STEPS WILL SLOPE. | | | | | | 10. [SATISFIED] IT APPEARS THE TOWNHOME AT THE WEST END | | | OF THE PROJECT WILL HOLD WATER BEHIND THE DIANA PLACE | | | SIDEWALK. | | | | | | 11. [SATISFIED] PROVIDE A CROSS SECTION FROM THE NORTH | | | PROPERTY LINE TO THE FACE OF THE BUILDING INCLUDING | | | DIMENSIONS TO THE OUTSIDE OF THE UNDERGROUND PARKING | | | GARAGE. | | | | | | 12. [SATISFIED - CONDITION OF ENGINEERING PERMIT | | | APPROVAL - FOR THE EXFILTRATION TRENCH ALONG THE NORTH | | | PROPERTY LINE, THE SFWMD TRENCH EQUATION WILL HAVE TO | | | BE MODIFIED TO ACCOUNT FOR THE RETAINING WALL ON ONE | | | SIDE AND POSSIBLE GARAGE WALL ON THE OTHER THAT WILL | | | LIMIT THE FLOW OUT OF THE TRENCH.] | | | | | | 13. [SATISFIED] EXPLAIN HOW THE EXFILTRATION TRENCH | | | ALONG THE NORTH PROPERTY LINE WILL BE MAINTAINED, | | | INCLUDING POSSIBLE REPLACEMENT, WHEN IT HAS LOST ITS | | | DISPOSAL CAPACITY IN A FEW YEARS. | | | | | | 14. [NOT SATISFIED. CONDITION OF ENGINEERING PERMIT | | | APPROVAL - PROVIDE AN EXFILTRATION TRENCH DETAIL, | | | LABELING THE TRENCH WIDTH AND THE ELEVATIONS FOR THE | | | TOP OF TRENCH, THE BOTTOM OF THE TRENCH, AND THE PIPE | | | INVERT.] | | | | | | 15. [NOT SATISFIED. CONDITION OF ENGINEERING PERMIT | | | APPROVAL - PROVIDE DETAIL OF CONTROL STRUCTURE(S). NOTE | | | BLEEDERS CANNOT BE USED AS PART OF THE CONTROL TO | | | SURCHARGE THE EXFILTRATION TRENCH.] | | | | | | 16. [SATISFIED] SHOW MILL AND RESURFACING LIMITS ON | | | CURRIE CRESCENT (BECAUSE OF THE TRENCH CUTS AND THE | | | CHANGE IN PAVEMENT MARKINGS FOR THE PARKING SPACES). | | | PREVIOUS COMMENT: SHOW MILL AND RESURFACING LIMITS FOR | | | TRENCH CUTS IN THE ROADWAY PER CITY'S STANDARD DETAIL | | | GC-8. | | | | | | 17. [SATISFIED] CONVERT EXISTING DRAINAGE STRUCTURE IN | | | THE EXISTING SOUTH DRIVEWAY TO S. FLAGLER DRIVE TO A | | | CATCH BASIN WITH A HOODED FRAME AND GRATE. THE | | | STRUCTURE MAY NEED TO BE ENLARGED IN ORDER TO CONNECT | | | THE PROPOSED 15-INCH RCP FROM THE DEVELOPMENT. | | | | | | 18. [SATISFIED - CONDITION OF ENGINEERING PERMIT | | | APPROVAL - DRAINAGE SYSTEM DESIGN TO CONSIDER SEA LEVEL | | | RISE.] | | | | | | 19. [SATISFIED - PIPE WAS REMOVED] WHAT IS THE PURPOSE | | | OF THE 6-INCH HDPE PIPE BETWEEN THE SIDEWALK AND EAST | | | PROPERTY LINE? | | | | | | 20. [SATISFIED. CONDITION OF ENGINEERING PERMIT | | | APPROVAL - THE ROOF DRAIN SYSTEM WILL NEED TO BE | | | DESIGNED SO THAT MANHOLE LIDS ARE NOT DISPLACED BY THE | | | PRESSURE OF THE WATER OR TRAPPED AIR IN THE ROOF | | | DOWNSPOUTS.] | | | | | | 21. [SATISFIED] IT APPEARS THE TOWNHOME AT THE WEST END | | | OF THE PROJECT WILL HOLD WATER BEHIND THE DIANA PLACE | | | SIDEWALK. | | | | | | 22. [SATISFIED - WATER QUALITY TREATMENT PER SFWMD ERP | | | SHALL BE DESIGNED AND PROVIDED FOR THE ADDITIONAL | | | IMPERVIOUS AREA IN THE DIANA PLACE PARCEL.] NEW COMMENT | | | ? FINAL LAYOUT AND DESIGN OF DRAINAGE SYSTEMS ON DIANA | | | PLACE TO BE WORKED OUT DURING ENGINEERING PERMIT | | | SUBMITTAL. | | | | | | 23. [SATISFIED - DRAINAGE SYSTEM SHOWN ON THE RECENTLY | | | SUBMITTED FORTE RESIDENCES PLANS.] SHEET C-500 SHOWS | | | PROPOSED STORM PIPE ALONG THE NORTH CURB OF CURRIE | | | CRESCENT AND CATCH BASINS NEAR THE EAST END OF THE | | | STREET BUT NO INFORMATION IS PROVIDED FOR THESE. THE | | | SIDEWALK AND CURB SHOULD BE SHOWN TO BE REPLACED AND | | | PROPOSED ASPHALT PAVEMENT IN THE WESTBOUND LANE OF | | | CURRIE CRESCENT FOR THE STORM PIPE AND ON S. OLIVE AVE | | | FOR THE DRAINAGE MANHOLE. THE CURB RAMP ON THE NE | | | CORNER OF S. OLIVE AND CURRIE CRESCENT WILL NEED TO BE | | | CONSTRUCTED TO CURRENT ADA CRITERIA. | | | | | | 24. SATISFIED - GRADES MODIFIED] FOR THE NORTH DRIVEWAY | | | TO CURRIE CRESCENT, SHEET C-500 SHOWS SPOT GRADES OF | | | 10.92 AND 10.60+/-ME FOR THE EDGE OF PAVEMENT NEXT TO | | | THE DROP CURB/VALLEY GUTTER. CROSS SECTION D-D PROVIDES | | | A SPOT GRADE OF 11.07 FOR THE EP NEXT TO THE DROP | | | CURB/VALLEY GUTTER. | | | | | | 25. [SATISFIED - SPOT GRADES REMOVED FROM ARCHITECTURAL | | | PLANS] SECTION D-D ON SHEET C-500 SHOWS A SPOT GRADE OF | | | 11.86 AT THE PROPERTY LINE. SHEETS G-201 AND G-203 SHOW | | | A SPOT GRADE OF 11FT 3IN AT THE PROPERTY LINE. | | | | | | 26. [SATISFIED - SPOT GRADES REMOVED FROM ARCHITECTURAL | | | PLANS] AT THE NORTH DRIVEWAY TO S. FLAGLER DRIVE, SHEET | | | C-500 SHOWS THE PROPERTY LINE AT AN ELEVATION LESS THAN | | | 3.98 FT NAVD. SHEET G-203 SHOWS AN ELEVATION OF 4FT 3IN | | | AT THE PROPERTY LINE CROSSING THE DRIVEWAY. | | | | | | 27. [SATISFIED] - GRADES FOR CROSS SECTIONS SHOWN ON | | | SHEET C-501 SHALL AGREE WITH THE GRADING PLAN ON SHEET | | | C-500. | | | A. SECTION B-B SHOWS EP GRADE OF 11.00; GRADING PLAN | | | SHOWS SPOT GRADE OF 10.72. | | | B. SECTION C-C SHOWS BACK OF GUTTER ELEVATION OF 11.18; | | | GRADING PLAN SHOWS EP SPOT GRADE OF 10.72. | | | C. SECTION D-D SHOWS SPOT GRADE OF 11.83 AT THE | | | PROPERTY LINE/FRONT OF TRENCH DRAIN; GRADING PLAN CALLS | | | OUT TRENCH DRAIN RIM ELEVATION OF 12.90. | | | D. SECTIONS H-H, I-I AND J-J TO BE MODIFIED PER COMMENT | | | NO. 9. | | | | | | 28. CONSIDER MOVING THE CONTROL STRUCTURE OUT OF THE | | | SIDEWALK BETWEEN S. OLIVE AVE AND THE RESTAURANT/CAFE. | | | | | | 29. FORTE RESIDENCES DEVELOPMENT WAS INSTRUCTED TO MOVE | | | THE 5 FT WIDE SIDEWALK ON THE NORTH SIDE OF CURRIE | | | CRESCENT TO THE NORTH R/W LINE. THIS WILL REDUCE THE | | | WIDTH OF THE ROAD AND MAY IMPACT THE AUTOTURN ANALYSES | | | FOR FLAGLER TOWERS. | | | | | | 30. [SATISFIED] THE FRAME AND COVER OF THE PROPOSED | | | SANITARY SEWER MANHOLE WHERE CURRIE CRESCENT TURNS | | | NORTH SHALL NOT BE WITHIN THE CURB AND GUTTER. THE RIM | | | ELEVATION FOR THIS STRUCTURE (10.43) DOES NOT MATCH THE | | | GRADING PLAN (11.07). | | | | | | NEW COMMENTS: | | | 31. FORTE RESIDENCES? EOR TO JUSTIFY THE PROPOSED CROSS | | | SLOPES OF CURRIE CRESCENT OR FLATTEN THEM TO MEET THE | | | FLORIDA GREEN BOOK. | | | | | | 32. TYPE 'C' DETAIL HAS NOTE THAT WEIRS OR PRBS ARE NOT | | | TO BE USED IN THIS TYPE OF STRUCTURE. THERE IS A | | | PROPOSED TYPE 'C' INLET WITH PRB CALLED OUT IN THE | | | NORTH FRONTAGE ALONG S. OLIVE AVE. [CAN BE ADDRESSED | | | WITH ENGINEERING PERMIT SUBMITTAL] | | | | | | 33. SHOW SWALE WHERE THE TOP OF CURB ELEVATION IS | | | HIGHER THAN THE FRONT OF WALK ELEVATION ALONG DIANA | | | PLACE (NEAR WEST END OF THE PARALLEL PARKING SPACES). | | | [CAN BE ADDRESSED WITH ENGINEERING PERMIT SUBMITTAL] | | | | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
5 |
Status |
P |
Date |
09-28-2021 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
09-28-2021 |
Time |
17:23 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
09-28-2021 |
Time |
17:23 |
Sent To |
|
|
| Notes |
| 2021-09-28 17:23:40 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | SEPTEMBER 13, 2021 PLAN SUBMITTAL. | | | | | | 1. [CONDITION OF SITE PLAN APPROVAL - COORDINATE THE | | | GRADING OF CURRIE CRESCENT WITH THE FORTE RESIDENCES | | | DEVELOPMENT.] PROPOSED GRADES AT EAST CURB OF CURRIE | | | CRESCENT AT THE INTERFACE BETWEEN THE 9/8/21 FORTE | | | RESIDENCES GRADING PLAN AND THE 9/13/21 FLAGLER TOWERS | | | GRADING PLAN APPEAR TO MATCH. NOTE COMMENTS ON THE | | | 9/8/21 FORTE RESIDENCES GRADING PLAN FOR CURRIE | | | CRESCENT MAY CHANGE THE PROPOSED GRADES OF CURRIE | | | CRESCENT. (PREVIOUS COMMENT: COORDINATE THE GRADING OF | | | CURRIE CRESCENT WITH THE FLAGLER FORTE DEVELOPMENT). | | | | | | 2. [CONDITION OF SITE PLAN APPROVAL - CURRIE CRESCENT | | | CURB AND GUTTER TO HAVE POSITIVE DRAINAGE TO THE STREET | | | DRAINAGE SYSTEM.] FLAGLER TOWERS GRADING PLAN SHOWS A | | | SPOT GRADE OF 11.07 AT THE PROPOSED SANITARY SEWER | | | MANHOLE. THIS GRADE WILL CAUSE WATER TO POND IN THE | | | DRIVEWAY GUTTER TO THE NORTH (WHICH HAS SPOT GRADES OF | | | 10.93 ON THE SOUTH SIDE AND 11.18 ME ON THE NORTH SIDE | | | OF THE DRIVEWAY APRON. | | | | | | 3. [CONDITION OF SITE PLAN APPROVAL - MAINTAIN CROWN | | | CROSS SECTION OF CURRIE CRESCENT.] | | | | | | 4. [SATISFIED] REQUESTED DIMENSIONS WERE ONLY PROVIDE | | | FOR SECTIONS B-B, C-C, D-D, H-H, AND J-J. PREVIOUS | | | COMMENT: FOR THE CROSS SECTIONS ON SHEET C-501, PROVIDE | | | DIMENSIONS FROM PROPERTY LINE/RIGHT OF WAY LINE TO | | | VALLEY GUTTER OR BACK OF SIDEWALK. | | | | | | 5. [NOT SATISFIED] [CONDITION OF SITE PLAN APPROVAL - | | | SIDEWALK ACROSS WEST DRIVEWAY TO CURRIE CRESCENT SHALL | | | SLOPE TOWARD THE STREET. THE HIGH POINT OF THE DRIVEWAY | | | SHALL BE SUFFICIENT TO PREVENT STORMWATER RUNOFF FROM | | | THE RIGHT OF WAY FROM FLOWING DOWN THE DRIVEWAY TOWARD | | | THE BUILDING AND AT THE SAME TIME MINIMIZE THE AREA OF | | | THE DRIVEWAY SLOPING TOWARD THE ROAD (I.E. MAXIMIZE THE | | | DRIVEWAY SLOPE BETWEEN THE HIGH POINT AND THE BACK OF | | | THE SIDEWALK.)] SUGGEST SLOPING THE SIDEWALK PORTION OF | | | THE DRIVEWAY SHOWN IN SECTION B-B TOWARD THE VALLEY | | | GUTTER. THE GRADES SHOWN ON SHEET C-500 FOR THE | | | DRIVEWAY WITH SECTION B-B (10.72 AT EP AND 10.70/10.84 | | | AT BOW ACROSS DRIVEWAY) DO NOT MATCH THE GRADES SHOWN | | | ON SECTION B-B ON SHEET C-501 (11.00 AT EP AND 11.04 AT | | | BACK OF CROSSWALK [HIGH POINT OF DRIVEWAY]). SECTION | | | B-B SHOWS LESS THAN 1/2 INCH DROP (0.04 FT) BETWEEN | | | BACK OF WALK AND EP. THIS SHORT RISE WILL NOT STOP MUCH | | | ROADWAY STORMWATER RUNOFF FROM FLOWING DOWN THE | | | DRIVEWAY. THE GRADING PLAN DOESN?T APPEAR TO SUPPORT | | | ALL OF THE CROSSWALK/SIDEWALK SLOPING TOWARD THE ROAD. | | | | | | 6. [SATISFIED - SLOPES REMOVED FROM SHEET G-203.] | | | PREVIOUS COMMENT: SECTION D-D SHOWS 13.5% SLOPE EAST OF | | | THE PROPERTY LINE. SHEET G-203 SHOWS 7.5% RAMP UP. | | | PREVIOUS COMMENT: COORDINATE THE SLOPES SHOWN FOR THE | | | DRIVEWAYS WITH THE ARCHITECTURAL PLANS. FOR EXAMPLE, | | | SECTION C-C SHOWS 3.4% SLOPE BETWEEN THE BUILDING AND | | | VALLEY GUTTER. SHEET A-101 SHOWS THE DRIVEWAY AT 7.5% | | | SLOPE. | | | | | | 7. {SATISFIED] SECTION D-D: PROVIDE SIDEWALK AREA WITH | | | SLOPE NO STEEPER THAN 2%. | | | | | | 8. [SATISFIED] SECTION E-E: CORRECT LABELS FOR ROAD | | | CENTERLINE AND PROPERTY LINE. | | | | | | 9. [PARTIALLY SATISFIED] [CONDITION OF SITE PLAN | | | APPROVAL - PARALLEL PARKING SPACES ON DIANA PLACE SHALL | | | SLOPE TO THE PROPOSED NORTH TYPE 'D' CURB AT MINIMUM 2% | | | CROSS SLOPE. LANDSCAPE AREA BETWEEN BACK CURB AND 10 FT | | | SIDEWALK SHALL HAVE 4:1 OR FLATTER SLOPE. THE 6.8 FT | | | LONG SIDEWALK CONNECTORS BETWEEN 10 FT WIDE SIDEWALK | | | AND THE PROPERTY LINE CAN SLOPE UP TO 7.2% (EQUATES TO | | | LESS THAN 0.5 FT DROP) WITHOUT NEEDING HANDRAILS. | | | DRAINAGE STRUCTURE AND STORM PIPE WILL BE NEEDED AT | | | EAST END OF PARALLEL PARKING SPACES TO COLLECT | | | STORMWATER RUNOFF AND CONVEY TO EXISTING DRAINAGE | | | STRUCTURE.] (PREVIOUS COMMENT- GRADING OF THE AREA | | | BETWEEN THE SOUTH PROPERTY LINE AND THE CENTER LINE OF | | | DIANA PLACE CAN BE A CONDITION OF SITE PLAN APPROVAL TO | | | BE WORKED OUT DURING ENGINEERING PERMIT SUBMITTAL.] | | | REVISED COMMENT: THE GRADING BETWEEN THE ROAD | | | CENTERLINE AND R/W, AS SHOWN ON SECTIONS H-H THROUGH | | | J-J NEEDS FURTHER REFINEMENT. SINCE STEPS ARE BEING | | | PROPOSED TO MAKE UP THE VERTICAL DISTANCE BETWEEN THE | | | FINISHED FLOORS OF THE HOUSING UNITS AND THE DIANA | | | PLACE PARCEL, MAINTAIN NORMAL CROWN FOR DIANA PLACE AND | | | SLOPE THE PARKING TOWARD THE PROPOSED CURB LINE. FOR | | | SECTION J-J, THE LANDSCAPE AREA SHOULD MEET THE TOP OF | | | CURB. FOR SECTION J-J, SLOPE THE SIDEWALK TOWARD THE | | | ROAD AND INSTALL A CATCH BASIN IN THE SMALL LANDSCAPE | | | AREA AND CONNECT INTO THE CURB INLET ON THE STREET. | | | PROVIDE SECTION(S) ON EITHER SIDE OF THE STEPS TO SHOW | | | HOW THE AREA BETWEEN THE STEPS WILL SLOPE. | | | | | | 10. [SATISFIED] IT APPEARS THE TOWNHOME AT THE WEST END | | | OF THE PROJECT WILL HOLD WATER BEHIND THE DIANA PLACE | | | SIDEWALK. | | | | | | 11. [SATISFIED] PROVIDE A CROSS SECTION FROM THE NORTH | | | PROPERTY LINE TO THE FACE OF THE BUILDING INCLUDING | | | DIMENSIONS TO THE OUTSIDE OF THE UNDERGROUND PARKING | | | GARAGE. | | | | | | 12. [SATISFIED - CONDITION OF ENGINEERING PERMIT | | | APPROVAL - FOR THE EXFILTRATION TRENCH ALONG THE NORTH | | | PROPERTY LINE, THE SFWMD TRENCH EQUATION WILL HAVE TO | | | BE MODIFIED TO ACCOUNT FOR THE RETAINING WALL ON ONE | | | SIDE AND POSSIBLE GARAGE WALL ON THE OTHER THAT WILL | | | LIMIT THE FLOW OUT OF THE TRENCH.] | | | | | | 13. [SATISFIED] EXPLAIN HOW THE EXFILTRATION TRENCH | | | ALONG THE NORTH PROPERTY LINE WILL BE MAINTAINED, | | | INCLUDING POSSIBLE REPLACEMENT, WHEN IT HAS LOST ITS | | | DISPOSAL CAPACITY IN A FEW YEARS. | | | | | | 14. [NOT SATISFIED. CONDITION OF ENGINEERING PERMIT | | | APPROVAL - PROVIDE AN EXFILTRATION TRENCH DETAIL, | | | LABELING THE TRENCH WIDTH AND THE ELEVATIONS FOR THE | | | TOP OF TRENCH, THE BOTTOM OF THE TRENCH, AND THE PIPE | | | INVERT.] | | | | | | 15. [NOT SATISFIED. CONDITION OF ENGINEERING PERMIT | | | APPROVAL - PROVIDE DETAIL OF CONTROL STRUCTURE(S). NOTE | | | BLEEDERS CANNOT BE USED AS PART OF THE CONTROL TO | | | SURCHARGE THE EXFILTRATION TRENCH.] | | | | | | 16. [SATISFIED] SHOW MILL AND RESURFACING LIMITS ON | | | CURRIE CRESCENT (BECAUSE OF THE TRENCH CUTS AND THE | | | CHANGE IN PAVEMENT MARKINGS FOR THE PARKING SPACES). | | | PREVIOUS COMMENT: SHOW MILL AND RESURFACING LIMITS FOR | | | TRENCH CUTS IN THE ROADWAY PER CITY'S STANDARD DETAIL | | | GC-8. | | | | | | 17. [SATISFIED] CONVERT EXISTING DRAINAGE STRUCTURE IN | | | THE EXISTING SOUTH DRIVEWAY TO S. FLAGLER DRIVE TO A | | | CATCH BASIN WITH A HOODED FRAME AND GRATE. THE | | | STRUCTURE MAY NEED TO BE ENLARGED IN ORDER TO CONNECT | | | THE PROPOSED 15-INCH RCP FROM THE DEVELOPMENT. | | | | | | 18. [SATISFIED - CONDITION OF ENGINEERING PERMIT | | | APPROVAL - DRAINAGE SYSTEM DESIGN TO CONSIDER SEA LEVEL | | | RISE.] | | | | | | 19. [SATISFIED - PIPE WAS REMOVED] WHAT IS THE PURPOSE | | | OF THE 6-INCH HDPE PIPE BETWEEN THE SIDEWALK AND EAST | | | PROPERTY LINE? | | | | | | 20. [SATISFIED. CONDITION OF ENGINEERING PERMIT | | | APPROVAL - THE ROOF DRAIN SYSTEM WILL NEED TO BE | | | DESIGNED SO THAT MANHOLE LIDS ARE NOT DISPLACED BY THE | | | PRESSURE OF THE WATER OR TRAPPED AIR IN THE ROOF | | | DOWNSPOUTS.] | | | | | | 21. [SATISFIED] IT APPEARS THE TOWNHOME AT THE WEST END | | | OF THE PROJECT WILL HOLD WATER BEHIND THE DIANA PLACE | | | SIDEWALK. | | | | | | 22. [CONDITION OF SITE PLAN APPROVAL - WATER QUALITY | | | TREATMENT PER SFWMD ERP SHALL BE DESIGNED AND PROVIDED | | | FOR THE ADDITIONAL IMPERVIOUS AREA IN THE DIANA PLACE | | | PARCEL.] WHAT DRAINAGE MITIGATION (WATER QUALITY AND | | | PEAK FLOW ATTENUATION) IS PROPOSED FOR THE ADDITIONAL | | | IMPERVIOUS AREA IN THE DIANA PLACE PARCEL. | | | | | | 23. [SATISFIED - DRAINAGE SYSTEM SHOWN ON THE RECENTLY | | | SUBMITTED FORTE RESIDENCES PLANS.] SHEET C-500 SHOWS | | | PROPOSED STORM PIPE ALONG THE NORTH CURB OF CURRIE | | | CRESCENT AND CATCH BASINS NEAR THE EAST END OF THE | | | STREET BUT NO INFORMATION IS PROVIDED FOR THESE. THE | | | SIDEWALK AND CURB SHOULD BE SHOWN TO BE REPLACED AND | | | PROPOSED ASPHALT PAVEMENT IN THE WESTBOUND LANE OF | | | CURRIE CRESCENT FOR THE STORM PIPE AND ON S. OLIVE AVE | | | FOR THE DRAINAGE MANHOLE. THE CURB RAMP ON THE NE | | | CORNER OF S. OLIVE AND CURRIE CRESCENT WILL NEED TO BE | | | CONSTRUCTED TO CURRENT ADA CRITERIA. | | | | | | 24. SATISFIED - GRADES MODIFIED] FOR THE NORTH DRIVEWAY | | | TO CURRIE CRESCENT, SHEET C-500 SHOWS SPOT GRADES OF | | | 10.92 AND 10.60+/-ME FOR THE EDGE OF PAVEMENT NEXT TO | | | THE DROP CURB/VALLEY GUTTER. CROSS SECTION D-D PROVIDES | | | A SPOT GRADE OF 11.07 FOR THE EP NEXT TO THE DROP | | | CURB/VALLEY GUTTER. | | | | | | 25. [SATISFIED - SPOT GRADES REMOVED FROM ARCHITECTURAL | | | PLANS] SECTION D-D ON SHEET C-500 SHOWS A SPOT GRADE OF | | | 11.86 AT THE PROPERTY LINE. SHEETS G-201 AND G-203 SHOW | | | A SPOT GRADE OF 11FT 3IN AT THE PROPERTY LINE. | | | | | | 26. [SATISFIED - SPOT GRADES REMOVED FROM ARCHITECTURAL | | | PLANS] AT THE NORTH DRIVEWAY TO S. FLAGLER DRIVE, SHEET | | | C-500 SHOWS THE PROPERTY LINE AT AN ELEVATION LESS THAN | | | 3.98 FT NAVD. SHEET G-203 SHOWS AN ELEVATION OF 4FT 3IN | | | AT THE PROPERTY LINE CROSSING THE DRIVEWAY. | | | | | | NEW COMMENTS: | | | 27. [CONDITION OF SITE PLAN APPROVAL - GRADES FOR CROSS | | | SECTIONS SHOWN ON SHEET C-501 SHALL AGREE WITH THE | | | GRADING PLAN ON SHEET C-500.] | | | A. SECTION B-B SHOWS EP GRADE OF 11.00; GRADING PLAN | | | SHOWS SPOT GRADE OF 10.72. | | | B. SECTION C-C SHOWS BACK OF GUTTER ELEVATION OF 11.18; | | | GRADING PLAN SHOWS EP SPOT GRADE OF 10.72. | | | C. SECTION D-D SHOWS SPOT GRADE OF 11.83 AT THE | | | PROPERTY LINE/FRONT OF TRENCH DRAIN; GRADING PLAN CALLS | | | OUT TRENCH DRAIN RIM ELEVATION OF 12.90. | | | D. SECTIONS H-H, I-I AND J-J TO BE MODIFIED PER COMMENT | | | NO. 9. | | | | | | 28. CONSIDER MOVING THE CONTROL STRUCTURE OUT OF THE | | | SIDEWALK BETWEEN S. OLIVE AVE AND THE RESTAURANT/CAFE. | | | | | | 29. FORTE RESIDENCES DEVELOPMENT WAS INSTRUCTED TO MOVE | | | THE 5 FT WIDE SIDEWALK ON THE NORTH SIDE OF CURRIE | | | CRESCENT TO THE NORTH R/W LINE. THIS WILL REDUCE THE | | | WIDTH OF THE ROAD AND MAY IMPACT THE AUTOTURN ANALYSES | | | FOR FLAGLER TOWERS. | | | | | | 30. THE FRAME AND COVER OF THE PROPOSED SANITARY SEWER | | | MANHOLE WHERE CURRIE CRESCENT TURNS NORTH SHALL NOT BE | | | WITHIN THE CURB AND GUTTER. THE RIM ELEVATION FOR THIS | | | STRUCTURE (10.43) DOES NOT MATCH THE GRADING PLAN | | | (11.07). | | | | | | | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
4 |
Status |
F |
Date |
09-01-2021 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
09-01-2021 |
Time |
15:14 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
09-01-2021 |
Time |
15:15 |
Sent To |
|
|
| Notes |
| 2021-09-01 15:15:04 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | AUGUST 25, 2021 PLAN SUBMITTAL. | | | | | | 1. [CONDITION OF SITE PLAN APPROVAL] THERE IS 0.42 FT | | | DIFFERENCE IN GRADES OF EP SHOWN ON THE FLAGLER FORTE | | | (11.02' NAVD) AND ON THE FLAGLER TOWER (10.60' NAVD +/- | | | ME) PLANS. (PREVIOUS COMMENT: COORDINATE THE GRADING OF | | | CURRIE CRESCENT WITH THE FLAGLER FORTE DEVELOPMENT. | | | | | | 2. [CONDITION OF SITE PLAN APPROVAL] CURRIE CRESCENT | | | CURB AND GUTTER TO HAVE POSITIVE DRAINAGE TO THE STREET | | | DRAINAGE SYSTEM. | | | | | | 3. [CONDITION OF SITE PLAN APPROVAL] MAINTAIN CROWN | | | CROSS SECTION OF CURRIE CRESCENT. | | | | | | 4. [SATISFIED] REQUESTED DIMENSIONS WERE ONLY PROVIDE | | | FOR SECTIONS B-B, C-C, D-D, H-H, AND J-J. PREVIOUS | | | COMMENT: FOR THE CROSS SECTIONS ON SHEET C-501, PROVIDE | | | DIMENSIONS FROM PROPERTY LINE/RIGHT OF WAY LINE TO | | | VALLEY GUTTER OR BACK OF SIDEWALK. | | | | | | 5. [SATISFIED] SUGGEST SLOPING THE SIDEWALK PORTION OF | | | THE DRIVEWAY SHOWN IN SECTION B-B TOWARD THE VALLEY | | | GUTTER. | | | | | | 6. [NOT SATISFIED] PREVIOUS COMMENT: SECTION D-D SHOWS | | | 13.5% SLOPE EAST OF THE PROPERTY LINE. SHEET G-203 | | | SHOWS 7.5% RAMP UP. PREVIOUS COMMENT: COORDINATE THE | | | SLOPES SHOWN FOR THE DRIVEWAYS WITH THE ARCHITECTURAL | | | PLANS. FOR EXAMPLE, SECTION C-C SHOWS 3.4% SLOPE | | | BETWEEN THE BUILDING AND VALLEY GUTTER. SHEET A-101 | | | SHOWS THE DRIVEWAY AT 7.5% SLOPE. | | | | | | 7. {SATISFIED] SECTION D-D: PROVIDE SIDEWALK AREA WITH | | | SLOPE NO STEEPER THAN 2%. | | | | | | 8. [SATISFIED] SECTION E-E: CORRECT LABELS FOR ROAD | | | CENTERLINE AND PROPERTY LINE. | | | | | | 9. [PARTIALLY SATISFIED - GRADING OF THE AREA BETWEEN | | | THE SOUTH PROPERTY LINE AND THE CENTER LINE OF DIANA | | | PLACE CAN BE A CONDITION OF SITE PLAN APPROVAL TO BE | | | WORKED OUT DURING ENGINEERING PERMIT SUBMITTAL.] | | | REVISED COMMENT: THE GRADING BETWEEN THE ROAD | | | CENTERLINE AND R/W, AS SHOWN ON SECTIONS H-H THROUGH | | | J-J NEEDS FURTHER REFINEMENT. SINCE STEPS ARE BEING | | | PROPOSED TO MAKE UP THE VERTICAL DISTANCE BETWEEN THE | | | FINISHED FLOORS OF THE HOUSING UNITS AND THE DIANA | | | PLACE PARCEL, MAINTAIN NORMAL CROWN FOR DIANA PLACE AND | | | SLOPE THE PARKING TOWARD THE PROPOSED CURB LINE. FOR | | | SECTION J-J, THE LANDSCAPE AREA SHOULD MEET THE TOP OF | | | CURB. FOR SECTION J-J, SLOPE THE SIDEWALK TOWARD THE | | | ROAD AND INSTALL A CATCH BASIN IN THE SMALL LANDSCAPE | | | AREA AND CONNECT INTO THE CURB INLET ON THE STREET. | | | PROVIDE SECTION(S) ON EITHER SIDE OF THE STEPS TO SHOW | | | HOW THE AREA BETWEEN THE STEPS WILL SLOPE. | | | | | | 10. [SATISFIED] IT APPEARS THE TOWNHOME AT THE WEST END | | | OF THE PROJECT WILL HOLD WATER BEHIND THE DIANA PLACE | | | SIDEWALK. | | | | | | 11. [SATISFIED] PROVIDE A CROSS SECTION FROM THE NORTH | | | PROPERTY LINE TO THE FACE OF THE BUILDING INCLUDING | | | DIMENSIONS TO THE OUTSIDE OF THE UNDERGROUND PARKING | | | GARAGE. | | | | | | 12. [SATISFIED - TO BE WORKED OUT AT ENGINEERING PERMIT | | | SUBMITTAL] FOR THE EXFILTRATION TRENCH ALONG THE NORTH | | | PROPERTY LINE, THE SFWMD TRENCH EQUATION WILL HAVE TO | | | BE MODIFIED TO ACCOUNT FOR THE RETAINING WALL ON ONE | | | SIDE AND POSSIBLE GARAGE WALL ON THE OTHER THAT WILL | | | LIMIT THE FLOW OUT OF THE TRENCH. | | | | | | 13. [SATISFIED] EXPLAIN HOW THE EXFILTRATION TRENCH | | | ALONG THE NORTH PROPERTY LINE WILL BE MAINTAINED, | | | INCLUDING POSSIBLE REPLACEMENT, WHEN IT HAS LOST ITS | | | DISPOSAL CAPACITY IN A FEW YEARS. | | | | | | 14. [NOT SATISFIED. INFORMATION CAN BE PROVIDED WITH | | | ENGINEERING PERMIT SUBMITTAL] PROVIDE AN EXFILTRATION | | | TRENCH DETAIL, LABELING THE TRENCH WIDTH AND THE | | | ELEVATIONS FOR THE TOP OF TRENCH, THE BOTTOM OF THE | | | TRENCH, AND THE PIPE INVERT. | | | | | | 15. [NOT SATISFIED. INFORMATION CAN BE PROVIDED WITH | | | ENGINEERING PERMIT SUBMITTAL] PROVIDE DETAIL OF CONTROL | | | STRUCTURE(S). NOTE BLEEDERS CANNOT BE USED AS PART OF | | | THE CONTROL TO SURCHARGE THE EXFILTRATION TRENCH. | | | | | | 16. [PARTIALLY SATISFIED] SHOW MILL AND RESURFACING | | | LIMITS ON CURRIE CRESCENT (BECAUSE OF THE TRENCH CUTS | | | AND THE CHANGE IN PAVEMENT MARKINGS FOR THE PARKING | | | SPACES). PREVIOUS COMMENT: SHOW MILL AND RESURFACING | | | LIMITS FOR TRENCH CUTS IN THE ROADWAY PER CITY'S | | | STANDARD DETAIL GC-8. | | | | | | 17. [SATISFIED] CONVERT EXISTING DRAINAGE STRUCTURE IN | | | THE EXISTING SOUTH DRIVEWAY TO S. FLAGLER DRIVE TO A | | | CATCH BASIN WITH A HOODED FRAME AND GRATE. THE | | | STRUCTURE MAY NEED TO BE ENLARGED IN ORDER TO CONNECT | | | THE PROPOSED 15-INCH RCP FROM THE DEVELOPMENT. | | | | | | 18. [SATISFIED - TO BE WORKED OUT AT ENGINEERING PERMIT | | | SUBMITTAL] DRAINAGE SYSTEM DESIGN TO CONSIDER SEA LEVEL | | | RISE. | | | | | | 19. [SATISFIED - PIPE WAS REMOVED] WHAT IS THE PURPOSE | | | OF THE 6-INCH HDPE PIPE BETWEEN THE SIDEWALK AND EAST | | | PROPERTY LINE? | | | | | | 20. [SATISFIED - TO BE ADDRESSED DURING FINAL | | | ENGINEERING DESIGN] THE ROOF DRAIN SYSTEM WILL NEED TO | | | BE DESIGNED SO THAT MANHOLE LIDS ARE NOT DISPLACED BY | | | THE PRESSURE OF THE WATER OR TRAPPED AIR IN THE ROOF | | | DOWNSPOUTS. | | | | | | 21. [SATISFIED] IT APPEARS THE TOWNHOME AT THE WEST END | | | OF THE PROJECT WILL HOLD WATER BEHIND THE DIANA PLACE | | | SIDEWALK. | | | | | | 22. [CONDITION OF SITE PLAN APPROVAL] WHAT DRAINAGE | | | MITIGATION (WATER QUALITY AND PEAK FLOW ATTENUATION) IS | | | PROPOSED FOR THE ADDITIONAL IMPERVIOUS AREA IN THE | | | DIANA PLACE PARCEL. | | | | | | NEW COMMENTS: | | | 23. SHEET C-500 SHOWS PROPOSED STORM PIPE ALONG THE | | | NORTH CURB OF CURRIE CRESCENT AND CATCH BASINS NEAR THE | | | EAST END OF THE STREET BUT NO INFORMATION IS PROVIDED | | | FOR THESE. THE SIDEWALK AND CURB SHOULD BE SHOWN TO BE | | | REPLACED AND PROPOSED ASPHALT PAVEMENT IN THE WESTBOUND | | | LANE OF CURRIE CRESCENT FOR THE STORM PIPE AND ON S. | | | OLIVE AVE FOR THE DRAINAGE MANHOLE. THE CURB RAMP ON | | | THE NE CORNER OF S. OLIVE AND CURRIE CRESCENT WILL NEED | | | TO BE CONSTRUCTED TO CURRENT ADA CRITERIA. | | | | | | 24. FOR THE NORTH DRIVEWAY TO CURRIE CRESCENT, SHEET | | | C-500 SHOWS SPOT GRADES OF 10.92 AND 10.60+/-ME FOR THE | | | EDGE OF PAVEMENT NEXT TO THE DROP CURB/VALLEY GUTTER. | | | CROSS SECTION D-D PROVIDES A SPOT GRADE OF 11.07 FOR | | | THE EP NEXT TO THE DROP CURB/VALLEY GUTTER. | | | | | | 25. SECTION D-D ON SHEET C-500 SHOWS A SPOT GRADE OF | | | 11.86 AT THE PROPERTY LINE. SHEETS G-201 AND G-203 SHOW | | | A SPOT GRADE OF 11FT 3IN AT THE PROPERTY LINE. | | | | | | 26. AT THE NORTH DRIVEWAY TO S. FLAGLER DRIVE, SHEET | | | C-500 SHOWS THE PROPERTY LINE AT AN ELEVATION LESS THAN | | | 3.98 FT NAVD. SHEET G-203 SHOWS AN ELEVATION OF 4FT 3IN | | | AT THE PROPERTY LINE CROSSING THE DRIVEWAY. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
3 |
Status |
F |
Date |
08-19-2021 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
08-19-2021 |
Time |
13:36 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
08-19-2021 |
Time |
13:37 |
Sent To |
|
|
| Notes |
| 2021-08-19 13:37:20 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | AUGUST 5, 2021 PLAN SUBMITTAL. | | | | | | 1. [CONDITION OF SITE PLAN APPROVAL] COORDINATE THE | | | GRADING OF CURRIE CRESCENT WITH THE FLAGLER FORTE | | | DEVELOPMENT. | | | | | | 2. [CONDITION OF SITE PLAN APPROVAL] CURRIE CRESCENT | | | CURB AND GUTTER TO HAVE POSITIVE DRAINAGE TO THE STREET | | | DRAINAGE SYSTEM. | | | | | | 3. [CONDITION OF SITE PLAN APPROVAL] MAINTAIN CROWN | | | CROSS SECTION OF CURRIE CRESCENT. | | | | | | 4. [PARTIALLY SATISFIED] REQUESTED DIMENSIONS WERE ONLY | | | PROVIDE FOR SECTIONS B-B, C-C, D-D, H-H, AND J-J. | | | PREVIOUS COMMENT: FOR THE CROSS SECTIONS ON SHEET | | | C-501, PROVIDE DIMENSIONS FROM PROPERTY LINE/RIGHT OF | | | WAY LINE TO VALLEY GUTTER OR BACK OF SIDEWALK. | | | | | | 5. [SATISFIED] SUGGEST SLOPING THE SIDEWALK PORTION OF | | | THE DRIVEWAY SHOWN IN SECTION B-B TOWARD THE VALLEY | | | GUTTER. | | | | | | 6. [NOT SATISFIED] SECTION D-D SHOWS 10% SLOPE EAST OF | | | THE PROPERTY LINE. SHEET A-101 SHOWS 7.5% RAMP UP. | | | PREVIOUS COMMENT: COORDINATE THE SLOPES SHOWN FOR THE | | | DRIVEWAYS WITH THE ARCHITECTURAL PLANS. FOR EXAMPLE, | | | SECTION C-C SHOWS 3.4% SLOPE BETWEEN THE BUILDING AND | | | VALLEY GUTTER. SHEET A-101 SHOWS THE DRIVEWAY AT 7.5% | | | SLOPE. | | | | | | 7. {SATISFIED] SECTION D-D: PROVIDE SIDEWALK AREA WITH | | | SLOPE NO STEEPER THAN 2%. | | | | | | 8. [SATISFIED] SECTION E-E: CORRECT LABELS FOR ROAD | | | CENTERLINE AND PROPERTY LINE. | | | | | | 9. [PARTIALLY SATISFIED ? GRADING OF THE AREA BETWEEN | | | THE SOUTH PROPERTY LINE AND THE CENTER LINE OF DIANA | | | PLACE CAN BE A CONDITION OF SITE PLAN APPROVAL TO BE | | | WORKED OUT DURING ENGINEERING PERMIT SUBMITTAL.] THE | | | GRADING BETWEEN THE ROAD CENTERLINE AND R/W, AS SHOWN | | | ON SECTIONS H-H THROUGH K-K NEEDS FURTHER REFINEMENT. | | | THE ROAD AND PARKING CROSS SLOPES NEED TO MEET THE | | | CITY?S DESIGN CRITERIA AND BE ACCEPTABLE TO THE CITY | | | TRANSPORTATION ENGINEER. THE LANDSCAPE SLOPES STEEPER | | | THAN 4:1 ARE DIFFICULT TO MAINTAIN. FOR SECTION J-J, | | | THE LANDSCAPE AREA SHOULD MEET THE TOP OF CURB. FOR | | | SECTION K-K, THE ARROW FOR THE 0.1% LANDSCAPE SLOPE IS | | | POINTING IN THE WRONG DIRECTION. PREVIOUS COMMENT: | | | SECTION G-G, CONSIDER LOWERING THE COURTYARD AREA | | | WITHIN THE PROPERTY IN ORDER TO FLATTEN THE SLOPE | | | BETWEEN THE 10 FT WIDE SIDEWALK AND THE BACK OF CURB OF | | | DIANA PLACE. | | | | | | 10. [SATISFIED] IT APPEARS THE TOWNHOME AT THE WEST END | | | OF THE PROJECT WILL HOLD WATER BEHIND THE DIANA PLACE | | | SIDEWALK. | | | | | | 11. [SATISFIED] PROVIDE A CROSS SECTION FROM THE NORTH | | | PROPERTY LINE TO THE FACE OF THE BUILDING INCLUDING | | | DIMENSIONS TO THE OUTSIDE OF THE UNDERGROUND PARKING | | | GARAGE. | | | | | | 12. [SATISFIED - TO BE WORKED OUT AT ENGINEERING PERMIT | | | SUBMITTAL] FOR THE EXFILTRATION TRENCH ALONG THE NORTH | | | PROPERTY LINE, THE SFWMD TRENCH EQUATION WILL HAVE TO | | | BE MODIFIED TO ACCOUNT FOR THE RETAINING WALL ON ONE | | | SIDE AND POSSIBLE GARAGE WALL ON THE OTHER THAT WILL | | | LIMIT THE FLOW OUT OF THE TRENCH. | | | | | | 13. [SATISFIED] EXPLAIN HOW THE EXFILTRATION TRENCH | | | ALONG THE NORTH PROPERTY LINE WILL BE MAINTAINED, | | | INCLUDING POSSIBLE REPLACEMENT, WHEN IT HAS LOST ITS | | | DISPOSAL CAPACITY IN A FEW YEARS. | | | | | | 14. [NOT SATISFIED. INFORMATION CAN BE PROVIDED WITH | | | ENGINEERING PERMIT SUBMITTAL] PROVIDE AN EXFILTRATION | | | TRENCH DETAIL, LABELING THE TRENCH WIDTH AND THE | | | ELEVATIONS FOR THE TOP OF TRENCH, THE BOTTOM OF THE | | | TRENCH, AND THE PIPE INVERT. | | | | | | 15. [NOT SATISFIED. INFORMATION CAN BE PROVIDED WITH | | | ENGINEERING PERMIT SUBMITTAL] PROVIDE DETAIL OF CONTROL | | | STRUCTURE(S). NOTE BLEEDERS CANNOT BE USED AS PART OF | | | THE CONTROL TO SURCHARGE THE EXFILTRATION TRENCH. | | | | | | 16. [PARTIALLY SATISFIED] SHOW MILL AND RESURFACING | | | LIMITS ON CURRIE CRESCENT (BECAUSE OF THE TRENCH CUTS | | | AND THE CHANGE IN PAVEMENT MARKINGS FOR THE PARKING | | | SPACES). PREVIOUS COMMENT: SHOW MILL AND RESURFACING | | | LIMITS FOR TRENCH CUTS IN THE ROADWAY PER CITY'S | | | STANDARD DETAIL GC-8. | | | | | | 17. [SATISFIED] CONVERT EXISTING DRAINAGE STRUCTURE IN | | | THE EXISTING SOUTH DRIVEWAY TO S. FLAGLER DRIVE TO A | | | CATCH BASIN WITH A HOODED FRAME AND GRATE. THE | | | STRUCTURE MAY NEED TO BE ENLARGED IN ORDER TO CONNECT | | | THE PROPOSED 15-INCH RCP FROM THE DEVELOPMENT. | | | | | | 18. [SATISFIED ? TO BE WORKED OUT AT ENGINEERING PERMIT | | | SUBMITTAL] DRAINAGE SYSTEM DESIGN TO CONSIDER SEA LEVEL | | | RISE. | | | | | | 19. [SATISFIED ? PIPE WAS REMOVED] WHAT IS THE PURPOSE | | | OF THE 6-INCH HDPE PIPE BETWEEN THE SIDEWALK AND EAST | | | PROPERTY LINE? | | | | | | 20. [SATISFIED ? TO BE ADDRESSED DURING FINAL | | | ENGINEERING DESIGN] THE ROOF DRAIN SYSTEM WILL NEED TO | | | BE DESIGNED SO THAT MANHOLE LIDS ARE NOT DISPLACED BY | | | THE PRESSURE OF THE WATER OR TRAPPED AIR IN THE ROOF | | | DOWNSPOUTS. | | | | | | 21. [SATISFIED] IT APPEARS THE TOWNHOME AT THE WEST END | | | OF THE PROJECT WILL HOLD WATER BEHIND THE DIANA PLACE | | | SIDEWALK. | | | | | | 22. [CONDITION OF SITE PLAN APPROVAL] WHAT DRAINAGE | | | MITIGATION (WATER QUALITY AND PEAK FLOW ATTENUATION) IS | | | PROPOSED FOR THE ADDITIONAL IMPERVIOUS AREA IN THE | | | DIANA PLACE PARCEL. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
F |
Date |
07-27-2021 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
07-27-2021 |
Time |
16:44 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
07-27-2021 |
Time |
16:49 |
Sent To |
|
|
| Notes |
| 2021-07-27 16:45:52 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE JUNE | | | 30 SUBMITTAL. | | | | | | 1. COORDINATE THE GRADING OF CURRIE CRESCENT WITH THE | | | FLAGLER FORTE DEVELOPMENT. | | | | | | 2. CURRIE CRESCENT CURB AND GUTTER TO HAVE POSITIVE | | | DRAINAGE TO THE STREET DRAINAGE SYSTEM. | | | | | | 3. MAINTAIN CROWN CROSS SECTION OF CURRIE CRESCENT. | | | | | | 4. FOR THE CROSS SECTIONS ON SHEET C-501, PROVIDE | | | DIMENSIONS FROM PROPERTY LINE/RIGHT OF WAY LINE TO | | | VALLEY GUTTER OR BACK OF SIDEWALK. | | | | | | 5. SUGGEST SLOPING THE SIDEWALK PORTION OF THE DRIVEWAY | | | SHOWN IN SECTION B-B TOWARD THE VALLEY GUTTER. | | | | | | 6. COORDINATE THE SLOPES SHOWN FOR THE DRIVEWAYS WITH | | | THE ARCHITECTURAL PLANS. FOR EXAMPLE, SECTION C-C SHOWS | | | 3.4% SLOPE BETWEEN THE BUILDING AND VALLEY GUTTER. | | | SHEET A-101 SHOWS THE DRIVEWAY AT 7.5% SLOPE. | | | | | | 7. SECTION D-D: PROVIDE SIDEWALK AREA WITH SLOPE NO | | | STEEPER THAN 2%. | | | | | | 8. SECTION E-E: CORRECT LABELS FOR ROAD CENTERLINE AND | | | PROPERTY LINE. | | | | | | 9. SECTION G-G, CONSIDER LOWERING THE COURTYARD AREA | | | WITHIN THE PROPERTY IN ORDER TO FLATTEN THE SLOPE | | | BETWEEN THE 10 FT WIDE SIDEWALK AND THE BACK OF CURB OF | | | DIANA PLACE. | | | | | | 10. IT APPEARS THE TOWNHOME AT THE WEST END OF THE | | | PROJECT WILL HOLD WATER BEHIND THE DIANA PLACE | | | SIDEWALK. | | | | | | 11. PROVIDE A CROSS SECTION FROM THE NORTH PROPERTY | | | LINE TO THE FACE OF THE BUILDING INCLUDING DIMENSIONS | | | TO THE OUTSIDE OF THE UNDERGROUND PARKING GARAGE. | | | | | | 12. FOR THE EXFILTRATION TRENCH ALONG THE NORTH | | | PROPERTY LINE, THE SFWMD TRENCH EQUATION WILL HAVE TO | | | BE MODIFIED TO ACCOUNT FOR THE RETAINING WALL ON ONE | | | SIDE AND POSSIBLE GARAGE WALL ON THE OTHER THAT WILL | | | LIMIT THE FLOW OUT OF THE TRENCH. | | | | | | 13. EXPLAIN HOW THE EXFILTRATION TRENCH ALONG THE NORTH | | | PROPERTY LINE WILL BE MAINTAINED, INCLUDING POSSIBLE | | | REPLACEMENT, WHEN IT HAS LOST ITS DISPOSAL CAPACITY IN | | | A FEW YEARS. | | | | | | 14. PROVIDE AN EXFILTRATION TRENCH DETAIL, LABELING THE | | | TRENCH WIDTH AND THE ELEVATIONS FOR THE TOP OF TRENCH, | | | THE BOTTOM OF THE TRENCH, AND THE PIPE INVERT. | | | | | | 15. PROVIDE DETAIL OF CONTROL STRUCTURE(S). NOTE | | | BLEEDERS CANNOT BE USED AS PART OF THE CONTROL TO | | | SURCHARGE THE EXFILTRATION TRENCH. | | | | | | 16. SHOW MILL AND RESURFACING LIMITS FOR TRENCH CUTS IN | | | THE ROADWAY PER CITY'S STANDARD DETAIL GC-8. | | | | | | 17. CONVERT EXISTING DRAINAGE STRUCTURE IN THE EXISTING | | | SOUTH DRIVEWAY TO S. FLAGLER DRIVE TO A CATCH BASIN | | | WITH A HOODED FRAME AND GRATE. THE STRUCTURE MAY NEED | | | TO BE ENLARGED IN ORDER TO CONNECT THE PROPOSED 15-INCH | | | RCP FROM THE DEVELOPMENT. | | | | | | 18. DRAINAGE SYSTEM DESIGN TO CONSIDER SEA LEVEL RISE. | | | | | | 19. WHAT IS THE PURPOSE OF THE 6-INCH HDPE PIPE BETWEEN | | | THE SIDEWALK AND EAST PROPERTY LINE? | | | | | | 20. THE ROOF DRAIN SYSTEM WILL NEED TO BE DESIGNED SO | | | THAT MANHOLE LIDS ARE NOT DISPLACED BY THE PRESSURE OF | | | THE WATER OR TRAPPED AIR IN THE ROOF DOWNSPOUTS. | | | | | | 21. IT APPEARS THE TOWNHOME AT THE WEST END OF THE | | | PROJECT WILL HOLD WATER BEHIND THE DIANA PLACE | | | SIDEWALK. | | | | | | 22. WHAT DRAINAGE MITIGATION (WATER QUALITY AND PEAK | | | FLOW ATTENUATION) IS PROPOSED FOR THE ADDITIONAL | | | IMPERVIOUS AREA IN THE DIANA PLACE PARCEL. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
06-10-2021 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
06-10-2021 |
Time |
11:28 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
06-10-2021 |
Time |
11:29 |
Sent To |
|
|
| Notes |
| 2021-06-10 11:29:08 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. PROJECT SITE IS WITHIN A SPECIAL FLOOD HAZARD AREA. | | | DRAFT COASTAL FLOOD ZONE MAPS HAVE BEEN ISSUED BY FEMA | | | THAT MAY SHOW A HIGHER BASE FLOOD ELEVATION THAN WHAT | | | IS SHOWN ON THE CURRENT FLOOD INSURANCE RATE MAPS. TWO | | | FEET OF FREEBOARD ABOVE THE BFE WILL BE REQUIRED FOR | | | THE FINISHED FLOOR ELEVATION AND ANY | | | MECHANICAL/ELECTRICAL EQUIPMENT. | | | | | | 2. LABEL THE VERTICAL DATUM AND CONVERSION EQUATION TO | | | NGVD1929 ON ALL CIVIL ENGINEERING SHEETS WITH ELEVATION | | | INFORMATION. | | | | | | 3. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP | | | CRITERIA AND CONSIDER SEA LEVEL RISE. | | | | | | 4. MINIMUM 15 INCH DIAMETER RCP PIPE WITHIN THE RIGHT | | | OF WAY. | | | | | | 5. CURB RAMP AT CORNER OF CURRIE CRESCENT AND S. OLIVE | | | AVE TO MEET CURRENT ADA CRITERIA. | | | | | | 6. UPDATE FDOT STANDARD INDEX REFERENCES TO FDOT | | | STANDARD PLAN REFERENCES. | | | | | | 7. PROVIDE CROSS SECTIONS AT ALL DRIVEWAYS FROM THE | | | CENTERLINE OF THE ROAD TO 10 FEET WITHIN THE PROPERTY. | | | PROVIDE CROSS SLOPE INFORMATION FOR EACH CHANGE IN | | | SLOPE. SHOW THE LOCATION OF THE RIGHT OF WAY LINE. | | | | | | 8. PROVIDE TYPICAL CROSS SECTIONS FOR EACH SIDE OF THE | | | BUILDING FROM THE ROAD CENTERLINE TO THE FACE OF THE | | | BUILDING. SHOW THE LOCATION OF THE PROPERTY LINE. | | | | | | 9. THE ELEVATION OF THE TRENCH GRATES ACROSS THE | | | DRIVEWAYS SHOULD NOT BE LOWER THAN THE PERIMETER BERM | | | ELEVATION. | | | | | | 10. PRBS SHOULD BE USED IN STRUCTURES CONNECTED TO | | | EXFILTRATION TRENCHES AND ON THE OUTFALL PIPE. | | | | | | 11. SHOW SIDEWALK REPLACEMENT WHERE UTILITIES WILL BE | | | CONSTRUCTED. | | | | | | 12. IT APPEARS THERE WILL BE PARKING LOCATED BELOW THE | | | GROUNDWATER TABLE ELEVATION. DESCRIBE HOW THE | | | GROUNDWATER WILL BE PREVENTED FROM ENTERING THE BELOW | | | GRADE PARKING AREA. | | | | | | 13. SHOW UTILITIES ON THE LANDSCAPE PLANS. | | | | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY | | | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. | | | | | | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED | | | WITH THE ENGINEERING PERMIT APPLICATION. | | | | | | 3. PROVIDE A COPY OF THE SFWMD ERP BEFORE THE START OF | | | CONSTRUCTION. | | | | | | 4. DRAINAGE CALCULATIONS WILL BE REVIEWED WITH THE | | | ENGINEERING PERMIT APPLICATION. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
P |
Date |
07-26-2021 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
07-26-2021 |
Time |
07:59 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-07-26 08:03:03 | CONDITIONS OF APPROVAL: | | | | | | 1. REPLAT PRIOR TO C.O. | | | 2. AGREEMENT/LEASE FOR SIDEWALK ALONG SOUTH LINE WITHIN | | | CITY PROPERTY. | | | 3. MAINTENANCE AGREEMENT FOR ANY IMPROVEMENTS WITHIN | | | CITY RIGHT-OF-WAY. | | | 4. ANY REQUIRED UTILITY EASEMENTS. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
06-07-2021 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
06-07-2021 |
Time |
08:43 |
Rev Time |
|
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-06-07 09:12:19 | 1. REPLAT WILL BE REQUIRED. APPLICATION FOR MINOR | | | SUBDIVISION IS MADE THROUGH PLANNING. | | | 2. NEED BLOW UP OF METER AREA WITH ELEVATIONS. | | | 3. SIDEWALK ALONG DIANA PLACE AND FLAGLER WILL REQUIRE | | | MAINTENANCE AGREEMENT. | | | 4. UTILITY EASEMENTS WILL BE REQUIRED FOR METERS AND | | | POSSIBLY WATER MAIN ALONG OLIVE AVE. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
5 |
Status |
P |
Date |
09-27-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
09-27-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-09-27 21:37:42 | NO FURTHER COMMENTS | | | | | | SATISFIED. APPROVED WITH THE CONDITION OF REVISING | | | FREIGHT MANAGEMENT PLAN. | | | | | | TRAFFIC COMMENTS | | | 1) SATISFIED. PROVIDE COUNTY TPS LETTER ONCE RECEIVED. | | | 2) SATISFIED. SECOND PARAGRAPH OF THE TRAFFIC STUDY | | | SEEMS INCOMPLETE OR MISSING TEXT AT THE END | | | 3) SATISFIED. DRIVEWAY DIAGRAM SHOWCASES AN ACCESS | | | POINT ON DIANA, DUE TO THAT, THE TRAFFIC STUDY IS | | | INVALID IN ITS ASSUMPTIONS AND FINDINGS. PLEASE CORRECT | | | AND REVISE ACCORDING TO THE LATEST SITE PLAN. | | | 4) SATISFIED. PROPERLY DEPICT INBOUND/OUTBOUND VOLUMES | | | THROUGH EACH OF THE PROPOSED DRIVEWAYS OR ENTRY POINTS. | | | AGGREGATE AND SHOWCASE VOLUMES ENTERING/EXITING THE S | | | FLAGLER AND CURRIE CRESCENT MAIN DRIVEWAYS IN FIGURE 4. | | | 5) SATISFIED. SPECIFY THE FUNCTIONALITY OF EACH | | | DRIVEWAY (I.E. SERVICE, PUBLIC AND RESIDENTIAL) | | | 6) SATISFIED. PROVIDE A SEPARATE TRAFFIC STUDY FROM THE | | | ONE SUBMITTED TO THE COUNTY, WHERE ALL VEHICULAR | | | VOLUMES (I.E. RESIDENTIAL) ARE CONSIDERED | | | | | | SITE COMMENTS | | | 7) SATISFIED. ON THE SITE PLAN, PLEASE SHOWCASE BASIC | | | CURB DETAILS (I.E. DRIVEWAY, PAVEMENT MARKINGS AND | | | PARKING STALLS) OF THE PROPERTIES ON THE OPPOSITE SIDE | | | OF THE ROADS SURROUNDING THE PROPOSED DEVELOPMENT | | | 8) SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE | | | TRUCK AND SERVICE VEHICLES DRIVING IN AND OUT OF THE | | | PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES | | | CLEARLY DEFINED. VEHICULAR MOVEMENTS SHALL BE DEPICTED | | | FROM OLIVE AVENUE AND THROUGH ALL POTENTIALLY | | | SERVICEABLE AREAS | | | 9) SATISFIED. PROVIDE SITE PLAN, OR INDICATE THE | | | SPECIFIC SHEET SHOWCASING: ROAD, SIDEWALK, AND DRIVEWAY | | | DIMENSIONS. SIDEWALK DIMENSIONS ARE MISSING. | | | 10) SATISFIED. PROVIDE A MINIMUM OF 8 FEET WIDE | | | SIDEWALK ALONG PROPERTY FRONTAGE ON OLIVE AVE AND | | | CURRIE CRESCENT. | | | 11) SATISFIED. PROVIDE A MINIMUM OF 10 FEET SIDEWALK | | | ALONG FLAGLER DR | | | 12) SATISFIED. IDENTIFY AND DESIGNATE BY WAY OF | | | PAVEMENT MARKINGS AN EASILY ACCESSIBLE MICRO-MOBILITY | | | STATION AREA (MINIMUM 8 X 20 FEET) AND PROVIDE BASIC | | | ELECTRIFICATION READINESS (CIRCUIT BOX AND ELECTRIC | | | CONDUIT) | | | 13) SATISFIED. MAXIMUM ALLOWED DRIVEWAY WIDTH IS 25 | | | FEET. THE RESIDENTIAL DRIVEWAY ON CURRIE CRESCENT DOES | | | NOT MEET SUCH CRITERIA. | | | 14) SATISFIED. MISSING DETAILS FOR THE SIDEWALK ON THE | | | SOUTH-WEST CORNER OF THE PROPOSED DEVELOPMENT | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
4 |
Status |
P |
Date |
09-01-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
09-01-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-09-01 13:38:58 | PASSED WITH THE FOLLOWING CONDITION: | | | | | | PROVIDE THE REVISED FREIGHT/SERVICE VEHICLES MANAGEMENT | | | PLAN. | | | | | | TRAFFIC COMMENTS | | | 1) SATISFIED. PROVIDE COUNTY TPS LETTER ONCE RECEIVED. | | | 2) SATISFIED. SECOND PARAGRAPH OF THE TRAFFIC STUDY | | | SEEMS INCOMPLETE OR MISSING TEXT AT THE END | | | 3) SATISFIED. DRIVEWAY DIAGRAM SHOWCASES AN ACCESS | | | POINT ON DIANA, DUE TO THAT, THE TRAFFIC STUDY IS | | | INVALID IN ITS ASSUMPTIONS AND FINDINGS. PLEASE CORRECT | | | AND REVISE ACCORDING TO THE LATEST SITE PLAN. | | | 4) SATISFIED. PROPERLY DEPICT INBOUND/OUTBOUND VOLUMES | | | THROUGH EACH OF THE PROPOSED DRIVEWAYS OR ENTRY POINTS. | | | AGGREGATE AND SHOWCASE VOLUMES ENTERING/EXITING THE S | | | FLAGLER AND CURRIE CRESCENT MAIN DRIVEWAYS IN FIGURE 4. | | | 5) SATISFIED. SPECIFY THE FUNCTIONALITY OF EACH | | | DRIVEWAY (I.E. SERVICE, PUBLIC AND RESIDENTIAL) | | | 6) SATISFIED. PROVIDE A SEPARATE TRAFFIC STUDY FROM THE | | | ONE SUBMITTED TO THE COUNTY, WHERE ALL VEHICULAR | | | VOLUMES (I.E. RESIDENTIAL) ARE CONSIDERED | | | SITE COMMENTS | | | 7) SATISFIED. ON THE SITE PLAN, PLEASE SHOWCASE BASIC | | | CURB DETAILS (I.E. DRIVEWAY, PAVEMENT MARKINGS AND | | | PARKING STALLS) OF THE PROPERTIES ON THE OPPOSITE SIDE | | | OF THE ROADS SURROUNDING THE PROPOSED DEVELOPMENT | | | 8) SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE | | | TRUCK AND SERVICE VEHICLES DRIVING IN AND OUT OF THE | | | PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES | | | CLEARLY DEFINED. VEHICULAR MOVEMENTS SHALL BE DEPICTED | | | FROM OLIVE AVENUE AND THROUGH ALL POTENTIALLY | | | SERVICEABLE AREAS | | | 9) SATISFIED. PROVIDE SITE PLAN, OR INDICATE THE | | | SPECIFIC SHEET SHOWCASING: ROAD, SIDEWALK, AND DRIVEWAY | | | DIMENSIONS. SIDEWALK DIMENSIONS ARE MISSING. | | | 10) SATISFIED. PROVIDE A MINIMUM OF 8 FEET WIDE | | | SIDEWALK ALONG PROPERTY FRONTAGE ON OLIVE AVE AND | | | CURRIE CRESCENT. | | | 11) SATISFIED. PROVIDE A MINIMUM OF 10 FEET SIDEWALK | | | ALONG FLAGLER DR | | | 12) SATISFIED. IDENTIFY AND DESIGNATE BY WAY OF | | | PAVEMENT MARKINGS AN EASILY ACCESSIBLE MICRO-MOBILITY | | | STATION AREA (MINIMUM 8 X 20 FEET) AND PROVIDE BASIC | | | ELECTRIFICATION READINESS (CIRCUIT BOX AND ELECTRIC | | | CONDUIT) | | | 13) SATISFIED. MAXIMUM ALLOWED DRIVEWAY WIDTH IS 25 | | | FEET. THE RESIDENTIAL DRIVEWAY ON CURRIE CRESCENT DOES | | | NOT MEET SUCH CRITERIA. | | | 14) SATISFIED. MISSING DETAILS FOR THE SIDEWALK ON THE | | | SOUTH-WEST CORNER OF THE PROPOSED DEVELOPMENT | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
3 |
Status |
F |
Date |
08-19-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
08-19-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-08-19 11:12:33 | TRAFFIC COMMENTS | | | 1) SATISFIED. PROVIDE COUNTY TPS LETTER ONCE RECEIVED. | | | 2) SATISFIED. SECOND PARAGRAPH OF THE TRAFFIC STUDY | | | SEEMS INCOMPLETE OR MISSING TEXT AT THE END | | | 3) SATISFIED. DRIVEWAY DIAGRAM SHOWCASES AN ACCESS | | | POINT ON DIANA, DUE TO THAT, THE TRAFFIC STUDY IS | | | INVALID IN ITS ASSUMPTIONS AND FINDINGS. PLEASE CORRECT | | | AND REVISE ACCORDING TO THE LATEST SITE PLAN. | | | 4) SATISFIED. PROPERLY DEPICT INBOUND/OUTBOUND VOLUMES | | | THROUGH EACH OF THE PROPOSED DRIVEWAYS OR ENTRY POINTS. | | | AGGREGATE AND SHOWCASE VOLUMES ENTERING/EXITING THE S | | | FLAGLER AND CURRIE CRESCENT MAIN DRIVEWAYS IN FIGURE 4. | | | 5) SATISFIED. SPECIFY THE FUNCTIONALITY OF EACH | | | DRIVEWAY (I.E. SERVICE, PUBLIC AND RESIDENTIAL) | | | 6) SATISFIED. PROVIDE A SEPARATE TRAFFIC STUDY FROM THE | | | ONE SUBMITTED TO THE COUNTY, WHERE ALL VEHICULAR | | | VOLUMES (I.E. RESIDENTIAL) ARE CONSIDERED | | | SITE COMMENTS | | | 7) SATISFIED. ON THE SITE PLAN, PLEASE SHOWCASE BASIC | | | CURB DETAILS (I.E. DRIVEWAY, PAVEMENT MARKINGS AND | | | PARKING STALLS) OF THE PROPERTIES ON THE OPPOSITE SIDE | | | OF THE ROADS SURROUNDING THE PROPOSED DEVELOPMENT | | | 8) SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE | | | TRUCK AND SERVICE VEHICLES DRIVING IN AND OUT OF THE | | | PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES | | | CLEARLY DEFINED. VEHICULAR MOVEMENTS SHALL BE DEPICTED | | | FROM OLIVE AVENUE AND THROUGH ALL POTENTIALLY | | | SERVICEABLE AREAS | | | 9) SATISFIED. PROVIDE SITE PLAN, OR INDICATE THE | | | SPECIFIC SHEET SHOWCASING: ROAD, SIDEWALK, AND DRIVEWAY | | | DIMENSIONS. SIDEWALK DIMENSIONS ARE MISSING. | | | 10) PARTIALLY SATISFIED. PROVIDE A MINIMUM OF 8 FEET | | | WIDE SIDEWALK ALONG PROPERTY FRONTAGE ON OLIVE AVE AND | | | CURRIE CRESCENT. | | | 11) NOT SATISFIED. PROVIDE A MINIMUM OF 10 FEET | | | SIDEWALK ALONG FLAGLER DR | | | 12) NOT SATISFIED. IDENTIFY AND DESIGNATE BY WAY OF | | | PAVEMENT MARKINGS AN EASILY ACCESSIBLE MICRO-MOBILITY | | | STATION AREA (MINIMUM 8 X 20 FEET) AND PROVIDE BASIC | | | ELECTRIFICATION READINESS (CIRCUIT BOX AND ELECTRIC | | | CONDUIT) | | | 13) NOT SATISFIED. MAXIMUM ALLOWED DRIVEWAY WIDTH IS 25 | | | FEET. THE RESIDENTIAL DRIVEWAY ON CURRIE CRESCENT DOES | | | NOT MEET SUCH CRITERIA. | | | 14) NOT SATISFIED. MISSING DETAILS FOR THE SIDEWALK ON | | | THE SOUTH-WEST CORNER OF THE PROPOSED DEVELOPMENT | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
2 |
Status |
F |
Date |
07-16-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
07-16-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-07-16 21:32:33 | TRAFFIC COMMENTS | | | 1) PARTIALLY SATISFIED. PROVIDE COUNTY TPS LETTER ONCE | | | RECEIVED. | | | 2) SATISFIED. SECOND PARAGRAPH OF THE TRAFFIC STUDY | | | SEEMS INCOMPLETE OR MISSING TEXT AT THE END | | | 3) SATISFIED. DRIVEWAY DIAGRAM SHOWCASES AN ACCESS | | | POINT ON DIANA, DUE TO THAT, THE TRAFFIC STUDY IS | | | INVALID IN ITS ASSUMPTIONS AND FINDINGS. PLEASE CORRECT | | | AND REVISE ACCORDING TO THE LATEST SITE PLAN. | | | 4) PARTIALLY SATISFIED. PROPERLY DEPICT | | | INBOUND/OUTBOUND VOLUMES THROUGH EACH OF THE PROPOSED | | | DRIVEWAYS OR ENTRY POINTS. AGGREGATE AND SHOWCASE | | | VOLUMES ENTERING/EXITING THE S FLAGLER AND CURRIE | | | CRESCENT MAIN DRIVEWAYS IN FIGURE 4. | | | 5) SATISFIED. SPECIFY THE FUNCTIONALITY OF EACH | | | DRIVEWAY (I.E. SERVICE, PUBLIC AND RESIDENTIAL) | | | 6) SATISFIED. PROVIDE A SEPARATE TRAFFIC STUDY FROM THE | | | ONE SUBMITTED TO THE COUNTY, WHERE ALL VEHICULAR | | | VOLUMES (I.E. RESIDENTIAL) ARE CONSIDERED | | | | | | SITE COMMENTS | | | 7) SATISFIED. ON THE SITE PLAN, PLEASE SHOWCASE BASIC | | | CURB DETAILS (I.E. DRIVEWAY, PAVEMENT MARKINGS AND | | | PARKING STALLS) OF THE PROPERTIES ON THE OPPOSITE SIDE | | | OF THE ROADS SURROUNDING THE PROPOSED DEVELOPMENT | | | 8) SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE | | | TRUCK AND SERVICE VEHICLES DRIVING IN AND OUT OF THE | | | PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES | | | CLEARLY DEFINED. VEHICULAR MOVEMENTS SHALL BE DEPICTED | | | FROM OLIVE AVENUE AND THROUGH ALL POTENTIALLY | | | SERVICEABLE AREAS | | | 9) PARTIALLY SATISFIED. PROVIDE SITE PLAN, OR INDICATE | | | THE SPECIFIC SHEET SHOWCASING: ROAD, SIDEWALK, AND | | | DRIVEWAY DIMENSIONS. SIDEWALK DIMENSIONS ARE MISSING. | | | 10) NOT SATISFIED. PROVIDE A MINIMUM OF 8 FEET WIDE | | | SIDEWALK ALONG PROPERTY FRONTAGE ON OLIVE AVE AND | | | CURRIE CRESCENT | | | | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
06-10-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
06-10-2021 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-06-10 12:06:35 | TRAFFIC COMMENTS | | | 1) PROVIDE COUNTY TPS LETTER | | | 2) SECOND PARAGRAPH OF THE TRAFFIC STUDY SEEMS | | | INCOMPLETE OR MISSING TEXT AT THE END | | | 3) DRIVEWAY DIAGRAM SHOWCASES AN ACCESS POINT ON DIANA, | | | DUE TO THAT, THE TRAFFIC STUDY IS INVALID IN ITS | | | ASSUMPTIONS AND FINDINGS. PLEASE CORRECT AND REVISE | | | ACCORDING TO THE LATEST SITE PLAN | | | 4) PROPERLY DEPICT INBOUND/OUTBOUND VOLUMES THROUGH | | | EACH OF THE PROPOSED DRIVEWAYS OR ENTRY POINTS | | | 5) SPECIFY THE FUNCTIONALITY OF EACH DRIVEWAY (I.E. | | | SERVICE, PUBLIC AND RESIDENTIAL) | | | 6) PROVIDE A SEPARATE TRAFFIC STUDY FROM THE ONE | | | SUBMITTED TO THE COUNTY, WHERE ALL VEHICULAR VOLUMES | | | (I.E. RESIDENTIAL) ARE CONSIDERED | | | | | | SITE COMMENTS | | | 7) ON THE SITE PLAN, PLEASE SHOWCASE BASIC CURB DETAILS | | | (I.E. DRIVEWAY, PAVEMENT MARKINGS AND PARKING STALLS) | | | OF THE PROPERTIES ON THE OPPOSITE SIDE OF THE ROADS | | | SURROUNDING THE PROPOSED DEVELOPMENT | | | 8) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND | | | SERVICE VEHICLES DRIVING IN AND OUT OF THE PROPOSED | | | DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES CLEARLY | | | DEFINED. VEHICULAR MOVEMENTS SHALL BE DEPICTED FROM | | | OLIVE AVENUE AND THROUGH ALL POTENTIALLY SERVICEABLE | | | AREAS | | | 9) PROVIDE SITE PLAN, OR INDICATE THE SPECIFIC SHEET | | | SHOWCASING: ROAD, SIDEWALK AND DRIVEWAY DIMENSIONS | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
5 |
Status |
P |
Date |
09-28-2021 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
09-28-2021 |
Time |
08:34 |
Rev Time |
2.00 |
| Received By |
eschneid |
Date |
09-27-2021 |
Time |
09:48 |
Sent To |
|
|
| Notes |
| 2021-09-28 08:37:04 | CASE NO. PB 1857B 9/13/21 RESUBMITTAL | | | FLAGLER TOWERS | | | 1315 SOUTH FLAGLER DRIVE | | | | | | - CONTACT ERIC SCHNEIDER @ (561) 822-1446, | | | [email protected] | | | | | | - PUBLIC HEARING NOTIFICATION SIGNAGE SHALL BE POSTED | | | IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION | | | 94-39(I)(5) OF THE ZONING AND LAND DEVELOPMENT | | | REGULATIONS. | | | | | | 1) IN ACCORDANCE WITH SECTION 166.033 OF THE FLORIDA | | | STATUTES, YOU ARE NOT REQUIRED TO PROVIDE THE FAA | | | APPROVAL LETTER PRIOR TO PROCEEDING TO THE PLANNING | | | BOARD AND CITY COMMISSION UNLESS THE FAA ISSUES A FINAL | | | AGENCY ACTION OF DENIAL. PLEASE BE AWARE THAT THE | | | DEVELOPMENT ORDER WILL INCLUDE A PROVISION THAT THE FAA | | | APPROVAL WILL BE REQUIRED PRIOR TO ISSUING A BUILDING | | | PERMIT FOR WHATEVER HEIGHT THE FINAL BUILDING IS | | | APPROVED AT. | | | | | | 2) STAFF WILL NOT SUPPORT THE BUILDING IN EXCESS OF 300 | | | FEET IN HEIGHT. | | | | | | 3) ROBERT BROWN, CHIEF BUILDING OFFICIAL, MUST APPROVE | | | THE FFE OF 9. PLEASE REVIEW HIS COMMENTS WHEN THEY ARE | | | POSTED. | | | | | | 4) ROBERT BROWN, CHIEF BUILDING OFFICIAL, MUST APPROVE | | | THAT THE NEW CONNECTION TO THE DIANA PLACE CROSSWALK | | | PROVIDES AN ADA COMPLIANT ROUTE TO AVOID THE STEPS. | | | PLEASE REVIEW HIS COMMENTS WHEN THEY ARE POSTED. | | | | | | PARKING | | | | | | 5) CONDITION: TWO BICYCLE PARKING SPACES WERE REMOVED | | | FROM THE CAFE AREA (8 TO 6). THIS REQUIRES AN UPDATE TO | | | THE "PROPOSED" LINE OF THE BICYCLE PARKING TABLE. THE | | | SITE MEETS THE MINIMUM REQUIRED; HOWEVER, THE TABLE | | | WILL NEED TO BE CORRECTED PRIOR TO SCHEDULING THE CASE | | | BEFORE THE CITY COMMISSION. | | | | | | DEVELOPMENT REGULATION: FPL EASEMENT WHICH BISECTS THE | | | PROPOSED BUILDING LOCATION WILL NEED TO BE RELEASED BY | | | FPL AND ALL OVERHEAD LINES MUST BE REMOVED. ANY NEW | | | UTILITY LINES MUST BE RELOCATED UNDERGROUND. | | | | | | DEVELOPMENT REGULATION: THE IMPROVEMENTS TO THE CITY | | | OWNED PARCEL SOUTH OF THE PROPERTY, INCLUDING THE | | | SIDEWALK, WALKWAYS AND LANDSCAPE, WILL BE THE | | | MAINTENANCE RESPONSIBILITY OF THE FLAGLER TOWERS | | | PROJECT. MAINTENANCE AGREEMENTS AND EASEMENTS WILL BE | | | REQUIRED. | | | | | | DEVELOPMENT REGULATION: EVERY UNIT OWNER SHALL HAVE AT | | | LEAST ONE EV EQUIPPED PARKING SPACE. | | | | | | DEVELOPMENT REGULATION: THERE WILL BE A DEVELOPMENT | | | REGULATION REFERENCING THE TRAFFIC MANAGEMENT PLAN THAT | | | WAS APPROVED BY THE CITY'S TRAFFIC ENGINEER. | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
F |
Date |
09-01-2021 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
09-01-2021 |
Time |
17:07 |
Rev Time |
6.00 |
| Received By |
eschneid |
Date |
09-01-2021 |
Time |
17:04 |
Sent To |
|
|
| Notes |
| 2021-09-01 17:06:05 | CASE NO. PB 1857B - 3RD RESUBMITTAL REVIEW 9/1/21 | | | FLAGLER TOWERS | | | 1315 SOUTH FLAGLER DRIVE | | | | | | - CONTACT ERIC SCHNEIDER @ (561) 822-1446, | | | [email protected] | | | | | | - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN | | | WRITTEN FORMAT. | | | | | | - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF THREE | | | (3) PAPER COPIES AND AN ELECTRONIC COPY IN .PNG FORMAT | | | OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE | | | RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS | | | TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL | | | COMMENTS. | | | | | | - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT | | | RECEIVED A RESPONSE TO THE COMMENTS WITHIN 60 DAYS FROM | | | THE DATE OF ISSUANCE (BY NOVEMBER 1, 2021), THE | | | PLANNING DIVISION MAY NOTIFY THE APPLICANT THAT THE | | | CASE IS CONSIDERED WITHDRAWN. ANY FURTHER ACTION SHALL | | | REQUIRE A NEW DEVELOPMENT APPLICATION. | | | | | | - PLEASE NOTE THAT YOU WILL BE PERMITTED ON ADDITIONAL | | | SUBMITTAL. IF COMMENTS ARE NOT ADDRESSED YOU WILL BE | | | ASSESSED A RESUBMITTAL FEE. SUCH FEE IS 20% OF THE | | | ORIGINAL APPLICATION FEE ($600). | | | | | | - PUBLIC HEARING NOTIFICATION SIGNAGE SHALL BE POSTED | | | IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION | | | 94-39(I)(5) OF THE ZONING AND LAND DEVELOPMENT | | | REGULATIONS. | | | | | | 1) REPEAT COMMENT: THANK YOU FOR PROVIDING THE FAA | | | APPLICATION NUMBERS. YOU ARE REQUIRED TO SUBMIT THE FAA | | | APPROVAL FOR THE PROPOSED TOWER PRIOR TO SCHEDULING | | | THIS CASE FOR PLANNING BOARD. | | | | | | 2) REPEAT COMMENT: STAFF WILL NOT SUPPORT THE BUILDING | | | IN EXCESS OF 300 FEET IN HEIGHT. PLEASE NOTE THAT YOU | | | ARE WELCOME TO PROCEED THROUGH THE PUBLIC HEARING | | | PROCESS TO CITY COMMISSION; HOWEVER, STAFF WILL BE | | | RECOMMENDING DENIAL OF THE REQUEST AS CURRENTLY | | | PROPOSED. THE LATEST ROUND OF RESPONSES INCLUDES ITEMS | | | WHICH MUST BE PROVIDED AND CORRECTED PRIOR TO BEING | | | SCHEDULED FOR PLANNING BOARD, REGARDLESS OF THE | | | BUILDING DESIGN (EXAMPLE: PARKING LOT CORRECTIONS). | | | | | | BUILDING PLACEMENT | | | | | | 3) UPDATED COMMENT: SHEET G-201 WAS UPDATED TO SHOW THE | | | BUILDING 15 FEET FROM THE SOUTH PROPERTY LINE. THE | | | CIVIL PLAN CROSS SECTIONS H (14.6 FEET) AND I (14.8) | | | SHOW THE BUILDING CLOSER THAN 15 FEET FROM THE PROPERTY | | | LINE. ALL PLANS NEED TO SHOW THE SAME CONDITION WITH A | | | MINIMUM 15-FOOT SETBACK. | | | | | | 4) CITY STAFF HAS REVIEWED THE LATEST SIDEWALK AND | | | LANDSCAPE CONFIGURATION ALONG DIANA PLACE. | | | | | | A. UPDATED COMMENT: THE WESTERNMOST TOWNHOUSES, WITH AN | | | FFE OF 9 FEET ARE BELOW THE ROADWAY ELEVATION, WHICH IS | | | A PROBLEM. THANK YOU FOR PROVIDING INFORMATION ON HOW | | | YOU PLAN TO ACCOMPLISH THE DRAINAGE FOR THESE UNITS. | | | THIS NEEDS TO BE APPROVED BY ROBERT BROWN, CHIEF | | | BUILDING OFFICIAL. PLEASE NOTE THAT IT HAS COME TO THE | | | PLANNING STAFF'S ATTENTION THAT THE FIMA FLOOD ZONE | | | MAPS SHOW THAT YOUR FFE NEEDS TO BE SET AT 10, NOT 9 | | | FEET. WHILE THE CITY IS CURRENTLY APPEALING THIS | | | DESIGNATION; IF THE APPEAL IS NOT GRANTED, YOU WILL | | | NEED TO REVISE YOUR FINISHED FLOOR LEVEL. | | | | | | B. UPDATED COMMENT: THANK YOU FOR RELOCATING THE | | | SIDEWALK CLOSER TO THE TOWNHOUSES AND FLATTENING OUT | | | THE EXTREME GRADE ISSUES THAT PREVIOUSLY OCCURRED. THE | | | STAIRS THAT YOU HAVE USED TO OFFSET THIS GRADE | | | DIFFERENTIAL FOR THE WALKWAYS FROM THE SIDEWALK TO THE | | | UNITS MAY NOT OCCUR ON THE CITY PROPERTY BUT MUST | | | RATHER OCCUR ON YOUR PRIVATE PROPERTY. AS DISCUSSED ON | | | THE CALL, FOR WALK-UP UNITS, THIS TYPICALLY OCCURS AT | | | THE ENTRY TO THE BUILDING. PLEASE NOTE THAT PRELIMINARY | | | DISCUSSIONS THAT PLANNING STAFF HAD WITH BUILDING STAFF | | | VERIFIED THAT SHOULD THESE STAIRS BE WITHIN THE CITY | | | PROPERTY THEY WOULD BE REQUIRED TO HAVE HANDRAILS, | | | WHICH IS NOT AN ACCEPTABLE SITUATION. | | | | | | C. THE PROPOSED EAST/WEST SIDEWALK NOW SHOWS STEPS AT | | | THE WESTERN END TO OFFSET THE GRADE DIFFERENTIAL, WHICH | | | IS NOT ADA COMPLIANT. NO INFORMATION WAS PROVIDED TO | | | VERIFY THAT THE NEW CONNECTION TO THE DIANA PLACE | | | CROSSWALK PROVIDES AN ADA COMPLIANT ROUTE TO AVOID THE | | | STEPS. THIS NEW CONFIGURATION REQUIRES APPROVAL BY | | | ROBERT BROWN, CHIEF BUILDING OFFICIAL. | | | | | | PARKING | | | | | | 5) UPDATED COMMENT: THANK YOU FOR PROVIDING THE BICYCLE | | | PARKING CLOSER TO A GUEST ACCESSIBLE ENTRANCE TO THE | | | BUILDING. THE LOCATION APPEARS TO REQUIRE THAT USERS | | | WOULD NEED TO WALK THEIR BICYCLES THROUGH THE CAFE | | | SEATING AREA, WHICH IS NOT IDEAL FOR EITHER THE CAFE | | | OPERATION OR THE BICYCLE PARKER. PROVIDE A DIRECT PAVED | | | CONNECTION FROM THE FRONT OF THE RACKS TO THE PUBLIC | | | SIDEWALK SO THAT THE CONFLICT IS MINIMIZE (SEE E-MAILED | | | ADDENDUM). THIS WILL ALSO ALLOW GUESTS A ROUTE TO THE | | | BUILDING ENTRANCE THAT DOES NOT REQUIRE THEM TO WALK | | | THROUGH THE CAFE SEATING AREA. | | | | | | LANDSCAPE | | | | | | 6) THE ZONING AND LAND DEVELOPMENT REGULATIONS ONLY | | | PERMIT HEDGES WITHIN A SETBACK TO BE A MAXIMUM HEIGHT | | | OF 10 FEET. THE RESUBMITTED PLANS CALL OUT THE | | | PODOCARPUS ALONG THE SOUTH PROPERTY LINE TO BE GROWN TO | | | A HEIGHT OF 12 FEET TO ARCH OVER THE GATES. IS THIS | | | PROPOSED TO BE THE OVERALL HEIGHT OF THE ARCH OR THE | | | UNDERSIDE OF THE ARCH? YOU HAVE STATED THAT THERE WILL | | | BE COLUMNS FOR THE GATES. THIS WOULD FORCE THE HEDGES | | | WIDER FROM THE ENTRYWAY AND THUS CREATE A LARGE VISUAL | | | OBSTRUCTION FOR PEDESTRIANS ALONG THE NEW DIANA PLACE | | | WALKWAY. IF YOU CHOOSE TO MOVE FORWARD WITH THIS | | | CONFIGURATION, AN ADDITIONAL WAIVER MUST BE REQUESTED, | | | BUT STAFF WILL NOT SUPPORT IT. | | | | | | 7) UPDATED COMMENT: THE TWO NEW TREES PROVIDED ADJACENT | | | TO THE CANOPY AT THE SOUTH ENTRANCE ARE SHOWN PLANTED | | | IN PAVEMENT, WHICH IS NOT PERMITTED. THE PLANTING AREA | | | NEEDS TO BE SHOWN AS APPROPRIATE FOR A 200-GALLON ROOT | | | BALL. WHILE ALL SHOWING THAT THE TREES WILL BE PLANTED | | | IN PAVEMENT, THE CIVIL, SITE AND LANDSCAPE PLANS DO NOT | | | SHOW THE SAME PAVEMENT CONDITIONS IN THIS AREA. | | | | | | 8) SOME OF THE TREES ALONG THE SOUTH SIDE OF THE | | | BUILDING ARE SHOWN PLANTED IN PAVEMENT, WHICH IS NOT | | | PERMITTED. THE CIVIL, LANDSCAPE AND SITE PLANS ALL SHOW | | | THE CONSISTENT PAVEMENT CONDITION. | | | | | | DEVELOPMENT REGULATION: FPL EASEMENT WHICH BISECTS THE | | | PROPOSED BUILDING LOCATION WILL NEED TO BE RELEASED BY | | | FPL AND ALL OVERHEAD LINES MUST BE REMOVED. ANY NEW | | | UTILITY LINES MUST BE RELOCATED UNDERGROUND. | | | | | | DEVELOPMENT REGULATION: THE IMPROVEMENTS TO THE CITY | | | OWNED PARCEL SOUTH OF THE PROPERTY, INCLUDING THE | | | SIDEWALK, WALKWAYS AND LANDSCAPE, WILL BE THE | | | MAINTENANCE RESPONSIBILITY OF THE FLAGLER TOWERS | | | PROJECT. MAINTENANCE AGREEMENTS AND EASEMENTS WILL BE | | | REQUIRED. | | | | | | DEVELOPMENT REGULATION: EVERY UNIT OWNER SHALL HAVE AT | | | LEAST ONE EV EQUIPPED PARKING SPACE. | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
08-19-2021 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
08-19-2021 |
Time |
12:19 |
Rev Time |
8.00 |
| Received By |
eschneid |
Date |
08-18-2021 |
Time |
09:46 |
Sent To |
|
|
| Notes |
| 2021-08-19 12:16:46 | CASE NO. PB 1857B - 2ND RESUBMITTAL REVIEW 8/19/21 | | | FLAGLER TOWERS | | | 1315 SOUTH FLAGLER DRIVE | | | | | | - CONTACT ERIC SCHNEIDER @ (561) 822-1446, | | | [email protected] | | | | | | - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN | | | WRITTEN FORMAT. | | | | | | - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF THREE | | | (3) PAPER COPIES AND AN ELECTRONIC COPY IN .PNG FORMAT | | | OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE | | | RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS | | | TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL | | | COMMENTS. | | | | | | - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT | | | RECEIVED A RESPONSE TO THE COMMENTS WITHIN 60 DAYS FROM | | | THE DATE OF ISSUANCE (BY OCTOBER 19, 2021), THE | | | PLANNING DIVISION MAY NOTIFY THE APPLICANT THAT THE | | | CASE IS CONSIDERED WITHDRAWN. ANY FURTHER ACTION SHALL | | | REQUIRE A NEW DEVELOPMENT APPLICATION. | | | | | | - PLEASE NOTE THAT YOU WILL BE PERMITTED ON ADDITIONAL | | | SUBMITTAL. IF COMMENTS ARE NOT ADDRESSED YOU WILL BE | | | ASSESSED A RESUBMITTAL FEE. SUCH FEE IS 20% OF THE | | | ORIGINAL APPLICATION FEE ($600). | | | | | | - PUBLIC HEARING NOTIFICATION SIGNAGE SHALL BE POSTED | | | IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION | | | 94-39(I)(5) OF THE ZONING AND LAND DEVELOPMENT | | | REGULATIONS. | | | | | | 1) UPDATED COMMENT: THE CITY OWNED PARCEL SOUTH OF THE | | | PROJECT IS SUBJECT TO A DEED RESTRICTION. IN ORDER TO | | | ENSURE THAT THE PROPOSED CHANGES DO NOT IMPACT THE DEED | | | RESTRICTION, PRIOR TO SCHEDULING THE APPLICATION FOR | | | THE PLANNING BOARD MEETING, YOU MUST PROVIDE WRITTEN | | | CONSENT/NO OBJECTION FROM THE LAKE WORTH PIONEERS | | | ASSOCIATION TO THE CITY. | | | | | | 2) REPEAT COMMENT: THANK YOU FOR PROVIDING THE FAA | | | APPLICATION NUMBERS. YOU ARE REQUIRED TO SUBMIT THE FAA | | | APPROVAL FOR THE PROPOSED TOWER PRIOR TO SCHEDULING | | | THIS CASE FOR PLANNING BOARD. | | | | | | 3) REPEAT COMMENT: STAFF WILL NOT SUPPORT THE BUILDING | | | IN EXCESS OF 300 FEET IN HEIGHT. PLEASE NOTE THAT YOU | | | ARE WELCOME TO PROCEED THROUGH THE PUBLIC HEARING | | | PROCESS TO CITY COMMISSION; HOWEVER, STAFF WILL BE | | | RECOMMENDING DENIAL OF THE REQUEST AS CURRENTLY | | | PROPOSED. THE LATEST ROUND OF RESPONSES INCLUDES ITEMS | | | WHICH MUST BE PROVIDED AND CORRECTED PRIOR TO BEING | | | SCHEDULED FOR PLANNING BOARD, REGARDLESS OF THE | | | BUILDING DESIGN (EXAMPLE: PARKING LOT CORRECTIONS). | | | | | | BUILDING PLACEMENT | | | | | | 4) THERE IS A DIMENSION TAG ON SHEET G-201 THAT NOW | | | SHOWS A 14-FOOT 8-INCH SETBACK ALONG DIANA PLACE. THE | | | BUILDING MAY NOT BE CLOSER THAN 15 FEET TO THE PROPERTY | | | LINE. | | | | | | 5) CITY STAFF HAS REVIEWED THE LATEST SIDEWALK AND | | | LANDSCAPE CONFIGURATION ALONG DIANA PLACE. THANK YOU | | | FOR SHOWING THE PARALLEL PARKING CONFIGURATION. | | | A. THE SIDEWALK NEEDS TO BE MOVED CLOSER TO THE | | | TOWNHOUSES TO PROVIDE FOR A LARGER LANDSCAPE AREA ALONG | | | THE CURB TO PROVIDE A LARGER AREA FOR ROOT GROWTH AS | | | WELL AS TO MOVE THE TREES FURTHER AWAY FROM THE DOOR | | | SWING. | | | B. THE WESTERNMOST TOWNHOUSES, WITH A FFE OF 9 FEET ARE | | | BELOW THE ROADWAY ELEVATION, WHICH IS A PROBLEM. | | | C. SOME OF THE GRADE CHANGE BETWEEN THE TOWNHOUSE | | | COURTYARDS BEING SET AT CLOSE TO THE 9-FOOT FFE AND THE | | | ROADWAY ARE VERY STEEP. IT MAY BE BEST TO HAVE STEPS | | | DOWN FROM THE TOWNHOUSES TO A LOWER COURTYARD IN ORDER | | | TO MAKE UP THE GRADE CHANGE, SIMILAR TO HOW THE FLAGLER | | | TERRACE AND DOG PARK ARE HANDLED. | | | | | | 6) AT THE SOUTHWEST CORNER OF THE SITE, IS IT POSSIBLE | | | TO CONNECT THE EXISTING CROSSWALK DIRECTLY TO THE NEW | | | EAST/WEST SIDEWALK? IS THE STEEP SWALE NECESSARY? | | | | | | 7) UPDATED COMMENT: THE TWO NEW TREES PROVIDED ADJACENT | | | TO THE CANOPY AT THE SOUTH ENTRANCE, INCLUDING SPECIES | | | AND SIZE, ARE NOT SHOWN ON SHEET LG-3.1. SINCE THESE | | | TREES ARE SHOWN ON THE SITE, THEY ARE NOT TO BE | | | INCLUDED ON SHEET LG-3.2, THE DIANA ROAD IMPROVEMENTS. | | | STAFF IS UNABLE TO VERIFY THAT THE 10-FOOT DEPTH WILL | | | NOT INTERFERE THE TREES, NOR IF THE SPECIES IS | | | APPROPRIATE FOR THE AREA IN WHICH THEY ARE INSTALLED. | | | | | | 8) REPEAT COMMENT: PROVIDE THE HEIGHTS OF THE CAFE | | | AWNINGS FROM GRADE. | | | | | | ELEVATIONS | | | | | | 9) REPEAT COMMENT: THE EAST ELEVATION AT THE PARK IS | | | NOT ACCURATE. THE GREEN WALL SHOWN ON THE ELEVATION | | | DOES NOT HAVE THE STEPS UP TO THE TERRACE ACCURATELY | | | SHOWN. ADDITIONALLY, STAFF IS UNABLE TO MATCH UP HOW IT | | | ALIGNS WITH THE SITE PLAN. THE ELEVATION MAKES THIS | | | WALL APPEAR TO BE CURVING, YET THIS IS NOT REFLECTED ON | | | THE PLANS. | | | | | | PARKING | | | | | | 10) REPEAT COMMENT: THE ADA PARKING SPACE DETAIL | | | (ACCESSIBLE AND VAN ACCESSIBLE) ON SHEET A-054 DO NOT | | | CONFORM TO CITY STRIPING STANDARDS. THE CITY STANDARD | | | DETAIL HAS BEEN SENT TO TYLER WOOLSEY. THE CITY | | | REQUIRES 16 INCHES BETWEEN STALL DEMARCATION LINES FOR | | | ALL SPACES. | | | | | | 11) REPEAT COMMENT: PROVIDE THE DIMENSIONS FOR THE | | | BICYCLE RACK PAD ALONG SOUTH OLIVE. THE DEPTH MUST BE | | | AT LEAST SIX FEET AND THE WIDTH IS BASED ON THE NUMBER | | | OF RACK ELEMENTS. THE DIMENSIONS NEED TO BE SHOWN ON A | | | PLAN (SITE, CIVIL, OR HARDSCAPE) AND THE DETAIL FOR THE | | | SPECIFIC ALIGNMENT NEEDS TO BE ON A DETAIL SHEET. THE | | | GENERIC DETAIL IS NOT SUFFICIENT. NOTE: THE BICYCLE | | | PARKING AT THE CAFE IS NOT SHOWN ON THE HARDSCAPE PLAN. | | | | | | 12) REPEAT COMMENT: PROVIDE THE DETAILS OF THE BICYCLE | | | RACKS THAT WILL BE USED WITHIN THE BICYCLE STORAGE | | | ROOMS. THE BICYCLE STORAGE ROOMS MUST SHOW THE ACCURATE | | | RACKS AND THE DIMENSIONS REQUIRED BASED ON THE TYPE OF | | | RACKS. | | | | | | 13) REPEAT COMMENT: YOU MUST HAVE BICYCLE PARKING FOR | | | GUESTS (VISITORS) NEAR ONE OF THE GUEST ACCESSIBLE | | | ENTRANCES TO THE BUILDING. THE BICYCLE RACK BY THE CAFE | | | IS NOT NEAR AN ENTRANCE TO THE RESIDENTIAL PORTION OF | | | THE BUILDING THAT A GUEST CAN USE. IDENTIFY THE | | | ENTRANCE(S) THAT ARE GUEST ACCESSIBLE AND PROVIDE AT | | | LEAST ONE BICYCLE RACK, WITH PAD DIMENSIONS, ADJACENT | | | TO THAT ENTRANCE. THE PLANS DO NOT INDICATE WHICH | | | ENTRANCES ARE GUEST ACCESSIBLE. | | | | | | 14) THERE ARE ONLY 108, NOT 109 RESIDENTIAL EV SPACES | | | SHOWN. THERE IS TO BE ONE PER DWELLING UNIT. | | | | | | 15) THE GOAL IS TO ENSURE THAT EVERY UNIT OWNER HAS EV | | | CAPABILITY. WHILE YOU HAVE SHOWN 108 (SHORT 1) | | | RESIDENTIAL EV STATIONS, HOW WILL YOU ENSURE THAT | | | PARKING IS ASSIGNED SO THAT EACH UNIT GETS AN EV | | | RECEPTACLE? IT WOULD SEEM STRANGE THAT IF A UNIT OWNER | | | HAS TWO SPACES, THEY WOULD BE ON DIFFERENT FLOORS, | | | WHICH WOULD NEED TO BE THE CASE SINCE SHEET A-100 SHOWS | | | NO SPACES FOR RESIDENTIAL EV. | | | | | | LOADING/ACCESS | | | | | | 16) REPEAT COMMENT: THE CITY'S ENGINEERING SERVICES | | | DEPARTMENT NEEDS TO APPROVE THE USE OF CURRIE CRESCENT | | | FOR MANEUVERING PRIOR TO THE CASE PROCEEDING THROUGH | | | THE PUBLIC HEARING PROCESS. CALL TO DISCUSS IS | | | SCHEDULED. | | | | | | 17) REPEAT COMMENT: THE CITY'S ENGINEERING SERVICES | | | DEPARTMENT NEEDS TO APPROVE THE NUMBER OF ACCESS POINTS | | | TO CURRIE CRESCENT AND THE SEPARATION OF ACCESS POINTS | | | TO THE CASE PROCEEDING THROUGH THE PUBLIC HEARING | | | PROCESS. CALL TO DISCUSS IS SCHEDULED. | | | | | | WALLS | | | | | | 18) UPDATED COMMENT: THE PLANS SHOW A FENCE ALONG DIANA | | | PLACE AT THE TOWNHOUSE COURTYARDS. | | | A. NO DETAILS ON THE MATERIAL OF THE CONCEALED FENCE | | | WERE PROVIDED. | | | B. THE MAXIMUM 5-FOOT HEIGHT OF THE DECORATIVE METAL, | | | PICKET GATE IS NOT STATED ON THE PLANS. | | | | | | 19) REPEAT COMMENT: THE PLANS DO NOT CALL OUT WHAT | | | HEDGE MATERIAL WILL SCREEN THE 4-FOOT-TALL FENCE. THE | | | RESPONSE STATES THAT THE MATERIAL WILL BE A PODOCARPUS | | | HEDGE; HOWEVER, NO TAGS ON SHEET LG-3.1 DO NOT POINT TO | | | THE HEDGE OR ANY FEATURE WITH HE SAME HATCHING PATTERN | | | AS THE HEDGE. SHEET G-201 NEEDS TO BE CORRECTED TO | | | STATE MAXIMUM 5-FOOT HEDGE ALONG THE SOUTH COURTYARDS. | | | | | | LANDSCAPE | | | | | | 20) REPEAT COMMENT: SHEET LG-3.1 SHOWS PLANTING BEDS | | | AGAINST THE WEST SIDE OF THE BUILDING WHICH ARE NOT | | | REFLECTED ON THE CIVIL SHEETS OR SITE PLAN. ALL PLANS | | | MUST SHOW THE SAME, ACCURATE CONDITIONS. | | | | | | DEVELOPMENT REGULATION: FPL EASEMENT WHICH BISECTS THE | | | PROPOSED BUILDING LOCATION WILL NEED TO BE RELEASED BY | | | FPL AND ALL OVERHEAD LINES MUST BE REMOVED. ANY NEW | | | UTILITY LINES MUST BE RELOCATED UNDERGROUND. | | | | | | DEVELOPMENT REGULATION: THE IMPROVEMENTS TO THE CITY | | | OWNED PARCEL SOUTH OF THE PROPERTY, INCLUDING THE | | | SIDEWALK, WALKWAYS AND LANDSCAPE, WILL BE THE | | | MAINTENANCE RESPONSIBILITY OF THE FLAGLER TOWERS | | | PROJECT. MAINTENANCE AGREEMENTS AND EASEMENTS WILL BE | | | REQUIRED. | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
07-26-2021 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
07-26-2021 |
Time |
17:13 |
Rev Time |
8.00 |
| Received By |
eschneid |
Date |
07-20-2021 |
Time |
08:45 |
Sent To |
|
|
| Notes |
| 2021-07-26 17:14:29 | CASE NO. PB 1857B -1ST RESUBMITTAL REVIEW | | | FLAGLER TOWERS | | | 1315 SOUTH FLAGLER DRIVE | | | | | | - CONTACT ERIC SCHNEIDER @ (561) 822-1446, | | | [email protected] | | | | | | - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN | | | WRITTEN FORMAT. | | | | | | - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF THREE | | | (3) PAPER COPIES AND AN ELECTRONIC COPY IN .PNG FORMAT | | | OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE | | | RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS | | | TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL | | | COMMENTS. | | | | | | - THE PPRC COMMENTS SHALL BE SUFFICIENTLY ADDRESSED AND | | | SUBMITTED TO THE PLANNING DIVISION BY 5 PM ON FRIDAY, | | | JULY 30, 2021, TO BE ELIGIBLE TO BE SCHEDULED FOR THE | | | SEPTEMBER 21, 2021 PLANNING BOARD MEETING. | | | | | | - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT | | | RECEIVED A RESPONSE TO THE COMMENTS WITHIN 60 DAYS FROM | | | THE DATE OF ISSUANCE (BY AUGUST 10, 2021), THE PLANNING | | | DIVISION MAY NOTIFY THE APPLICANT THAT THE CASE IS | | | CONSIDERED WITHDRAWN. ANY FURTHER ACTION SHALL REQUIRE | | | A NEW DEVELOPMENT APPLICATION. | | | | | | - PLEASE NOTE THAT YOU WILL BE ASSESSED A RESUBMITTAL | | | FEE. SUCH FEE IS 20% OF THE ORIGINAL APPLICATION FEE | | | ($600). | | | | | | - PUBLIC HEARING NOTIFICATION SIGNAGE SHALL BE POSTED | | | IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION | | | 94-39(I)(5) OF THE ZONING AND LAND DEVELOPMENT | | | REGULATIONS. | | | | | | 1) REPEAT COMMENT: THANK YOU FOR PROVIDING THE TRAFFIC | | | STUDY THAT STATES THAT THE PROJECT DOES NOT GENERATE A | | | SIGNIFICANT IMPACT. HOWEVER, YOU ARE STILL REQUIRED TO | | | PROVIDE A PALM BEACH COUNTY TPS APPROVAL LETTER. | | | | | | 2) UPDATED COMMENT: STAFF DOES NOT OBJECT TO THE | | | PROPOSED SIDEWALK AND WALKWAYS TO THE TOWNHOUSE UNITS | | | BEING INSTALLED AND THE TREES BEING REPLACED ON THE | | | CITY OWNED PARCEL SOUTH OF THE PROJECT. THE PARCEL IS | | | SUBJECT TO A DEED RESTRICTION. IN ORDER TO ENSURE THAT | | | THE PROPOSED CHANGES DO NOT IMPACT THE DEED | | | RESTRICTION, PRIOR TO SCHEDULING THE APPLICATION FOR | | | THE PLANNING BOARD MEETING, YOU MUST PROVIDE WRITTEN | | | CONSENT/NO OBJECTION FROM THE LAKE WORTH PIONEERS | | | ASSOCIATION AND THE NORTON GALLERY AND SCHOOL OF ART, | | | INC., TO THE CITY. | | | | | | 3) REPEAT COMMENT: THANK YOU FOR PROVIDING THE FAA | | | APPLICATION NUMBERS. YOU ARE REQUIRED TO SUBMIT THE FAA | | | APPROVAL FOR THE PROPOSED TOWER PRIOR TO SCHEDULING | | | THIS CASE FOR PLANNING BOARD. | | | | | | 4) REPEAT COMMENT: STAFF WILL NOT SUPPORT THE BUILDING | | | IN EXCESS OF 300 FEET IN HEIGHT. PLEASE NOTE THAT YOU | | | ARE WELCOME TO PROCEED THROUGH THE PUBLIC HEARING | | | PROCESS TO CITY COMMISSION; HOWEVER, STAFF WILL BE | | | RECOMMENDING DENIAL OF THE REQUEST AS CURRENTLY | | | PROPOSED. THE LATEST ROUND OF RESPONSES INCLUDES ITEMS | | | WHICH MUST BE PROVIDED AND CORRECTED PRIOR TO BEING | | | SCHEDULED FOR PLANNING BOARD, REGARDLESS OF THE | | | BUILDING DESIGN (EXAMPLE: PARKING LOT CORRECTIONS). | | | | | | BUILDING PLACEMENT | | | | | | 5) STAFF HAS REASSESSED THE MEASURE POINTS TO DETERMINE | | | BASIS FOR THE NORTHERN SETBACK WAIVERS. LEVEL WILL BE | | | 15 FEET, LEVELS 2 THROUGH 4 (PODIUM) WILL BE 41 FEET | | | AND THE NORTHERN TOWER WILL BE 41 FEET. | | | | | | 6) THANK YOU FOR PROVIDING THE TWO CROSS SECTIONS EAST | | | OF THE RESIDENT ENTRANCE ALONG DIANA PLACE. PLEASE | | | PROVIDE ONE THAT INCLUDES THE ANGLED PARKING SPACES AND | | | ONE THAT INCLUDES THE EASTERNMOST TOWNHOUSE SO THAT | | | STAFF CAN SEE WHAT THE IMPACT OF CHANGING THE GRADE HAS | | | AT THESE TWO LOCATIONS. | | | | | | 7) STAFF HAS REVIEWED THE RESPONSE TO THE COMMENT | | | REGARDING PUSHING THE SOUTHERN TOWER BACK FROM THE | | | FACADE OF THE PODIUM. PROVIDE A CONTEXT ELEVATION FROM | | | SOUTH FLAGLER DRIVE FACING EAST WHICH SHOWS HOW THE | | | PROPOSED BUILDING INTERACTS WITH THE PARK AND THE | | | NORTON MUSEUM. STAFF HAS INCLUDED THE VIEWPOINT IN THE | | | COMMENT ADDENDUM SENT AS A SEPARATE FILE. | | | | | | 8) UPDATED COMMENT: THANK YOU FOR CLARIFYING THAT THE | | | FIVE (5) FOOT BALCONY ENCROACHMENT IS ONLY ON LEVEL 26 | | | AND 27. THIS WILL BE THE SPECIFIC WAIVER. STAFF WILL | | | NOT SUPPORT A BLANKET WAIVER FOR ALL THE BALCONIES ON | | | THE SOUTH FA?ADE TO EXTEND FIVE (5) FEET FROM THE | | | BUILDING SINCE THIS IS NOT HOW THE DRAWINGS ARE BEING | | | PRESENTED. THE WEST COLOR ELEVATION FAILS TO SHOW THE | | | BALCONY. THE ELEVATION DRAWINGS MUST MATCH THE FLOOR | | | PLANS. | | | | | | 9) PROVIDE THE DEPTH OF THE TERRACE ON THE SOUTH SIDE | | | OF THE TOWER ON LEVEL 10. THIS TERRACE ENCROACHES | | | FURTHER INTO THE SOUTHERN SETBACK THAN THE OTHER | | | TERRACES FOR WHICH DIMENSIONS WERE PROVIDED. | | | | | | 10) PROVIDE THE DEPTH OF THE TRELLIS FEATURES THAT | | | OVERHANG THE BUILDING EDGES. | | | | | | 11) UPDATED COMMENT: EVEN THOUGH THE CANOPY AT THE | | | SOUTH ENTRANCE WAS REDUCED IN SIZE, IT STILL INTERFERES | | | WITH THE SPECIMEN OAK TREE THAT IS BEING PROPOSED AT | | | THIS LOCATION. THE 10-FOOT DEPTH WILL INTERFERE WITH | | | ANY TREE INSTALLED AS SHOWN. | | | | | | 12) PROVIDE THE HEIGHTS OF THE CANOPIES AND AWNINGS | | | FROM GRADE. | | | | | | 13) REPEAT COMMENT: THE SITE OPEN SPACE IS INCORRECTLY | | | CALCULATED. THE AREAS SUCH AS THE MOTOR COURT AND THE | | | DRIVE WHERE IT IS ABOVE THE FIRST LEVEL OF THE BUILDING | | | IS NOT OPEN SPACE IT IS THE BUILDING ROOF OF THE | | | FIRST-FLOOR PARKING. | | | | | | 14) WHAT DOES THE 3-FOOT SETBACK ENCROACHMENT NOTE AT | | | THE FLAGLER DRIVE DRIVEWAY ENTRANCE REFER TOO? | | | | | | 15) WHAT OCCURS IN THE ROOM BEHIND THE TERRACE TO THE | | | WEST OF THE FLAGLER DRIVE RESIDENT PARK? IS THERE AN | | | OPPORTUNITY TO HAVE THIS AS A ROOM THAT RESIDENTS CAN | | | USE TO ENTERTAIN AS IT OVERLOOKS THE TERRACE AND THE | | | PARK? IS THERE AN OPPORTUNITY TO HAVE WINDOWS? SEE | | | ADDENDUM FOR LOCATION. | | | | | | 16) THE SIDEWALK ALONG FLAGLER DRIVE WHERE IT MEETS | | | FORTE MUST BE THE SAME WIDTH AS THE SIDEWALK THAT FORTE | | | IS INSTALLING, NOT FIVE FEET AS PROPOSED. THIS NEEDS TO | | | BE CLEARLY SHOWN ON THE PLANS. | | | | | | 17) EXPLAIN THE ENTRANCES TO THE TOWNHOUSES. ONE UNIT | | | APPEARS TO HAVE TWO MAIN ENTRANCES AND OTHERS SEEM TO | | | HAVE THE INTERNAL WALKWAYS THAT CROSS BETWEEN UNIT | | | COURTYARDS. PROVIDE ACCURATE CONFIGURATIONS. SEE | | | ADDENDUM FOR LOCATION. | | | | | | ELEVATIONS | | | | | | 18) PROVIDE THE ELEVATION DIMENSION LINES ON THE ACTUAL | | | ELEVATION DRAWINGS. THE STACKING DIAGRAM DOES NOT | | | PROVIDE THE DETAILS THAT ARE SHOWN ON THE ELEVATIONS. | | | | | | 19) THE EAST ELEVATION AT THE PARK IS NOT ACCURATE. THE | | | PARKING RAMP NOT SHOWN, AND THE DOORS AND WALLS DO NOT | | | SEEM ACCURATE WHEN COMPARED TO THE SITE AND LANDSCAPE | | | PLANS. | | | | | | PARKING | | | | | | 20) THE PROJECT NOW CONTAINS EXCESS PARKING SPACES; | | | HOWEVER, STAFF REQUIRES A BETTER DESCRIPTION OF HOW THE | | | SPACES IN EACH GARAGE WILL BE ACCESSED AND WHO HAS | | | ACCESS TO THE SPACES (VALET VS. SELF-PARK). UNTIL STAFF | | | HAS A FULL UNDERSTANDING OF HOW THE PARKING WILL | | | FUNCTION, WE ARE UNABLE TO GIVE AN ANSWER TO YOUR | | | QUESTION, "CAN WE COUNT THE TANDEM SPACES ON THE SECOND | | | GARAGE LEVEL TOWARDS MEETING OUR CODE REQUIREMENT IF WE | | | PROVIDE A VALET PARKING PLAN AND THE SPACES ARE USED | | | FOR VALETING THE STAFF, VISITORS, AND CAFE PARKING?" | | | PLEASE PROVIDE A BREAKDOWN LIKE THE TABLE PROVIDED IN | | | THE ADDENDUM. NOTE: IT DOES NOT NEED TO REPLACE ANY | | | TABLES YOU CURRENTLY PROVIDE. | | | | | | 21) REPEAT COMMENT: WHERE ARE THE GUEST PARKING SPACES | | | AND HOW ARE THEY ACCESSED (ARE THEY REQUIRED TO BE | | | VALET OR MAY THEY SELF-PARK)? THE 11 REQUIRED GUEST | | | PARKING SPACES MUST BE LABELED ON THE ON THE PLANS. | | | | | | 22) ADDITIONAL ADA COMMENTS FROM ROBERT BROWN REGARDING | | | THE SECOND LEVEL PARKING (ONLY AS CAFE CUSTOMERS) AND | | | GUEST PARKING: | | | | | | A. SINCE A TOTAL OF 67 PARKING SPACES ARE BEING | | | PROVIDED EXCLUSIVELY FOR CAFE CUSTOMERS, NO MATTER | | | WHETHER THOSE ARE SELF-PARKING OR VALET, 3 ACCESSIBLE | | | PARKING SPACES MUST BE PROVIDED FOR CAF? CUSTOMERS AND | | | THE USERS MUST BE ABLE TO SELF-PARK IF THEY WANT TO. | | | THEIR VEHICLE MAY HAVE BEEN MODIFIED TO THE POINT WHERE | | | A VALET CANNOT OPERATE IT. | | | B. SINCE THE SPACES ARE EXCLUSIVELY FOR CAFE CUSTOMERS, | | | ONE OF THE ACCESSIBLE SPACES MUST BE VAN ACCESSIBLE. | | | C. THE USERS OF THE ACCESSIBLE PARKING SPACES MUST BE | | | ABLE TO SELF-PARK IF THEY WANT TO. THEIR VEHICLE MAY | | | HAVE BEEN MODIFIED TO THE POINT WHERE A VALET CANNOT | | | OPERATE IT. | | | D. WHEN THE GUEST PARKING SPACES ARE DESIGNATED ON THE | | | PLANS, IF THEY ARE EXCLUSIVELY FOR GUESTS, THEY MUST | | | INCLUDE ACCESSIBLE AND VAN ACCESSIBLE PARKING IN | | | NUMBERS ACCORDING TO HOW MANY PARKING SPACES ARE | | | DESIGNATED EXCLUSIVELY FOR GUEST PARKING. | | | | | | 23) THE COMMENT RESPONSE STATES THAT THE LEVEL 3 | | | PARKING AREA IS ONLY FOR RESIDENTS. DOES THIS MEAN THAT | | | THIS IS A SELF-PARK ONLY PARKING AREA? | | | | | | 24) TANDEM PARKING SPACES ARE SHOWN ON LEVEL 3. WHO | | | USES THESE TANDEM SPACES? | | | | | | 25) ON THE RESIDENT PARKING LEVELS, DO UNIT OWNERS OWN | | | DESIGNATED PARKING SPACES? | | | | | | 26) REPEAT COMMENT: THE ADA PARKING SPACE DETAIL | | | (ACCESSIBLE AND VAN ACCESSIBLE) ON SHEET A-054 DO NOT | | | CONFORM TO CITY STRIPING STANDARDS. IF YOU REQUIRE THE | | | CITY STANDARD DETAIL, PLEASE LET STAFF KNOW AND IT WILL | | | BE PROVIDED. | | | | | | PARKING COUNTS: | | | | | | 27) SHEET A-100 BASEMENT LEVEL - CORRECT THE ERRORS | | | IDENTIFIED BELOW: | | | | | | A. THE TABLE LISTS 168 TOTAL PARKING SPACES, YET THE | | | PARKING TAGS SHOW 169 PARKING SPACES, WHICH VERIFIES | | | STAFF'S COUNT OF THE NUMBER OF PARKING SPACES. | | | THERE ARE ONLY 14 COMPACT SPACES PROVIDED, NOT 15 AS | | | STATED IN THE TABLE. | | | THERE ARE 147 STANDARD PARKING SPACES PROVIDED, NOT 145 | | | AS STATED IN THE TABLE. | | | | | | B. THE PARKING BY TYPE TABLE LISTS 277 STANDARD PARKING | | | SPACES, YET STAFF HAS COUNTED 325 STANDARD PARKING | | | SPACES. | | | | | | 28) SHEET A-102 LOBBY LEVEL - CORRECT THE ERRORS | | | IDENTIFIED BELOW: | | | | | | A. THE TABLE LISTS 43 TOTAL PARKING SPACES, YET STAFF | | | HAS COUNTED 68 PARKING SPACES. | | | THERE ARE 42 STANDARD PARKING SPACES PROVIDED, NOT 17 | | | AS STATED IN THE TABLE. | | | | | | B. THE BACK-UP DISTANCE BETWEEN SPACES 325 AND 344 ON | | | LEVEL 2 PARKING DOES NOT CONTAIN THE CODE MINIMUM 24 | | | FEET AISLE, SO ONE OF THE SPACES MUST BE REMOVED (OR | | | CONVERTED TO A COMPACT SPADE). | | | | | | 29) SHEET A-103 LEVEL 3 - CORRECT THE ERRORS IDENTIFIED | | | BELOW: | | | | | | A. THE TABLE LISTS 62 TOTAL PARKING SPACES, YET STAFF | | | HAS COUNTED 84 PARKING SPACES. | | | THERE ARE 61 STANDARD PARKING SPACES PROVIDED, NOT 40 | | | AS STATED IN THE TABLE. | | | THERE IS 1 COMPACT PARKING SPACE PROVIDED THAT IS NOT | | | ACCOUNTED FOR IN THE TABLE. | | | | | | B. THE PARKING SPACE NUMBERING ON SHEET A-103 STARTS AT | | | 351 INSTEAD OF 347 (NEXT NUMBER IN SEQUENCE FROM SHEET | | | A-102) AND THUS THE BUILDING IS SHOWN TO HAVE 434 | | | PARKING SPACES, WHICH IS NOT ACCURATE. | | | | | | 30) THERE ARE 430 TOTAL PARKING SPACES SHOWN ON THE | | | PLANS (INCLUDES 49 TANDEM SPACES). NOTE: THE VARIOUS | | | TABLES ALTERNATE BETWEEN COUNTING AND NOT COUNTING THE | | | TANDEM SPACES IN THE TOTAL. IT MAY BE BEST TO HAVE A | | | TOTAL OF THE SPACES THAT COUNT TOWARD THE PARKING | | | REQUIREMENT AND THEN LIST THE TANDEM SPACES ON EACH | | | FLOOR BELOW THE TOTAL AS ADDITIONAL AVAILABLE PARKING. | | | | | | 31) THANK YOU FOR PROVIDING BICYCLE PARKING; HOWEVER: | | | | | | A. PROVIDE THE DIMENSIONS FOR THE BICYCLE RACK PAD | | | ALONG SOUTH OLIVE. THE DEPTH MUST BE AT LEAST SIX FEET | | | AND THE WIDTH IS BASED ON THE NUMBER OF RACK ELEMENTS. | | | B. PROVIDE THE DETAILS OF THE BICYCLE RACKS THAT WILL | | | BE USED WITHIN THE BICYCLE STORAGE ROOMS. THE BICYCLE | | | STORAGE ROOMS MUST SHOW THE ACCURATE RACKS AND THE | | | DIMENSIONS REQUIRED BASED ON THE TYPE OF RACKS. | | | C. REPEAT COMMENT: YOU MUST HAVE BICYCLE PARKING FOR | | | GUESTS (VISITORS) NEAR ONE OF THE GUEST ACCESSIBLE | | | ENTRANCES TO THE BUILDING. THE BICYCLE RACK BY THE CAFE | | | IS NOT NEAR AN ENTRANCE TO THE RESIDENTIAL PORTION OF | | | THE BUILDING THAT A GUEST CAN USE. IDENTIFY THE | | | ENTRANCE(S) THAT ARE GUEST ACCESSIBLE AND PROVIDE AT | | | LEAST ONE BICYCLE RACK, WITH PAD DIMENSIONS, ADJACENT | | | TO THAT ENTRANCE. | | | | | | 32) UPDATED COMMENT: PROVIDE MORE DETAIL ON THE | | | PROPOSED PRE-WIRING OF THE BUILDING FOR EV CHARGER | | | INSTALLATION. WHILE STAFF APPRECIATES THAT YOU HAVE | | | SHOWN 4 EV SPACES, NO DETAILS ON HOW THESE ACTUALLY | | | FUNCTION WERE PROVIDED, TO INCLUDE WHERE THE CHARGING | | | UNITS WOULD BE PLACED. PLEASE BE AWARE THAT AT LEAST | | | ONE ADA PARKING SPACE WILL NEED TO BE EV COMPATIBLE. | | | BELOW ARE THE REQUIREMENTS FOR EV FACILITIES BASED ON | | | THE FORTE PROJECT REQUIREMENTS AND ARE THE EXPECTATIONS | | | FOR THIS PROJECT. PLEASE NOTE THAT IT MAKES AVAILABLE | | | LEVEL I CHARGING FOR EVERY UNIT OWNER WITH THE | | | FACILITIES IN PLACE TO UPGRADE TO A LEVEL 2 CHARGER. | | | | | | CHARGING STATIONS: ELECTRONIC VEHICLE INFRASTRUCTURE | | | MUST BE INSTALLED IN ACCORDANCE WITH PERMITS ISSUED BY | | | THE CITY?S BUILDING DIVISION AS FOLLOWS: | | | | | | A. ONE LEVEL 1 FULL CIRCUIT INSTALLATION IS REQUIRED | | | FOR EACH UNIT'S REQUIRED PARKING SPACES (109 TOTAL). | | | EACH CIRCUIT IS REQUIRED TO BE A 20 AMP, 120 VOLT | | | CIRCUIT, WITH RACEWAY/CONDUIT, WIRING, RECEPTACLE AND | | | OVERCURRENT PROTECTION TO CODE. THE DEVELOPER SHALL | | | INSTALL OVERSIZED RACEWAY/CONDUIT OR ADDITIONAL | | | RACEWAY/CONDUIT, AS APPROVED BY THE CITY'S BUILDING | | | DIVISION, THAT WILL PROVIDE THE ABILITY OF INDIVIDUAL | | | UNIT OWNERS OR THE HOMEOWNERS? ASSOCIATION TO INSTALL | | | THE WIRING, RECEPTACLE AND OVERCURRENT PROTECTION TO | | | CODE TO ALLOW PARKING SPACES TO BE UPGRADED TO A LEVEL | | | 2, 40 AMP, 208/240 VOLT CIRCUIT. THE DEVELOPER SHALL | | | PROVIDE SPACE TO INSTALL AN ADDITIONAL ELECTRICAL PANEL | | | TO ACCOMMODATE LEVEL 2 FULL CIRCUIT UPGRADES. | | | | | | B. TWO LEVEL 2 FULL CIRCUIT INSTALLATIONS ARE REQUIRED | | | FOR THE GUEST PARKING SPACES. EACH CIRCUIT IS REQUIRED | | | TO BE A 40 AMP, 208/240 VOLT CIRCUIT, WITH | | | RACEWAY/CONDUIT, WIRING, RECEPTACLE AND OVERCURRENT | | | PROTECTION TO CODE. ONE DUAL PORT ELECTRIC VEHICLE | | | CHARGER MUST BE INSTALLED FOR THE GUEST PARKING SPACES | | | PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF OCCUPANCY | | | FOR THE BUILDING. | | | | | | C. ONE LEVEL 1 FULL CIRCUIT INSTALLATION IS REQUIRED | | | FOR FOUR (4) OF THE EMPLOYEE PARKING SPACES. EACH | | | CIRCUIT IS REQUIRED TO BE A 20 AMP, 120 VOLT CIRCUIT, | | | WITH RACEWAY/CONDUIT, WIRING, RECEPTACLE AND | | | OVERCURRENT PROTECTION TO CODE. | | | | | | D. FOUR LEVEL 2 FULL CIRCUIT INSTALLATIONS ARE REQUIRED | | | FOR THE VALET PARKING SPACES. EACH CIRCUIT IS REQUIRED | | | TO BE A 40 AMP, 208/240 VOLT CIRCUIT, WITH | | | RACEWAY/CONDUIT, WIRING, RECEPTACLE AND OVERCURRENT | | | PROTECTION TO CODE. TWO DUAL PORT ELECTRIC VEHICLE | | | CHARGERS MUST BE INSTALLED FOR THE VALET PARKING SPACES | | | PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF OCCUPANCY | | | FOR THE BUILDING. THE VALET SPACES CONTAINING THE | | | ELECTRIC VEHICLE CHARGERS MAY NOT BE SOLD OR LEASED TO | | | RESIDENTS AND MUST REMAIN AVAILABLE FOR CHARGING | | | VEHICLES. | | | | | | LOADING/ACCESS | | | | | | 33) UPDATED COMMENT: THE NORTH SIDE OF CURRIE CRESCENT | | | HAS ON-STREET PARALLEL PARKING SPACES. THE TRUCK | | | TURNING DIAGRAM SHOWS THE TRUCK USING THE FULL WIDTH OF | | | CURRIE CRESCENT, WHICH IS IMPOSSIBLE IF A CAR IS PARKED | | | IN THE PARALLEL SPACES. THE CITY'S PARKING DEPARTMENT | | | DOES NOT SUPPORT THE REMOVAL OF PARKING SPACES IN THIS | | | AREA AS THE PARKING SPACES SEE SIGNIFICANT USAGE. THE | | | PARKING DIVISION WILL SUPPORT THE RELOCATION OF THE | | | FIVE EXISTING PARKING SPACES TO THE NORTH SIDE OF DIANA | | | PLACE. YOU NEED TO SHOW THE RELOCATED PARKING SPACES | | | ALONG DIANA PLACE. SUGGESTION: RECONFIGURE THE PARKING | | | ALONG THE NORTH SIDE OF DIANA PLACE TO BE A PARALLEL | | | CONFIGURATION. THIS WOULD ALLOW MORE ROOM FOR TREES AT | | | THE WEST END OF ROAD (WHERE THE ANGLE PARKING CURRENTLY | | | EXISTS), PUSH CARS (AND THEIR HEADLIGHTS AT NIGHT) | | | FURTHER AWAY FROM THE TOWNHOUSE UNITS ON THE WEST END | | | OF THE DEVELOPMENT, AND WOULD PROVIDE PARKING SPACES IN | | | FRONT OF ALL OF THE TOWNHOUSE UNITS THAT COULD BE | | | UTILIZED BY UNIT OWNER GUESTS WHO DO NOT WANT TO PARK | | | IN THE GARAGE. | | | | | | 34) REPEAT COMMENT: THE CITY'S ENGINEERING SERVICES | | | DEPARTMENT NEEDS TO APPROVE THE USE OF CURRIE CRESCENT | | | FOR MANEUVERING PRIOR TO THE CASE PROCEEDING THROUGH | | | THE PUBLIC HEARING PROCESS. CALL TO DISCUSS IS | | | SCHEDULED. | | | | | | 35) REPEAT COMMENT: THE CITY'S ENGINEERING SERVICES | | | DEPARTMENT NEEDS TO APPROVE THE NUMBER OF ACCESS POINTS | | | TO CURRIE CRESCENT AND THE SEPARATION OF ACCESS POINTS | | | TO THE CASE PROCEEDING THROUGH THE PUBLIC HEARING | | | PROCESS. CALL TO DISCUSS IS SCHEDULED. | | | | | | WALLS | | | | | | 36) PROVIDE THE DETAILS OF THE DECORATIVE THREE-FOOT | | | WALL ALONG THE VEHICULAR USE AREA ON THE NORTH PROPERTY | | | LINE AND THE RETAINING WALLS. | | | | | | 37) THE PLANS SHOW A FENCE ALONG DIANA PLACE AT THE | | | TOWNHOUSE COURTYARDS. PLEASE PROVIDE DETAILS OF THE | | | TYPE OF FENCE AND THE COLUMNS AND GATES. SHEET LG-1.1 | | | CALLS OUT THE COLUMNS AND GATES AS MAXIMUM 6 FEET. THE | | | PLANS DO NOT CALL OUT WHAT HEDGE MATERIAL WILL SCREEN | | | THE 4-FOOT-TALL FENCE. IN ORDER TO PROVIDE A | | | COMFORTABLE PEDESTRIAN EXPERIENCE ALONG THE NEW DIANA | | | PLACE WALKWAY, THE GATES NEED TO BE A PICKET STYLE AND | | | THE HEDGE AND GATES SHALL NOT EXCEED 5 FEET IN HEIGHT. | | | | | | 38) PROVIDE THE DETAILS OF THE STONE PLINTH WITH | | | DECORATIVE FENCE LISTED ON THE HARDSCAPE PLAN. | | | | | | SIGNAGE | | | | | | 39) ONE OF THE COMMENT RESPONSES STATED THAT THERE | | | WOULD BE DIRECTIONAL SIGNAGE TO GUIDE DRIVING CUSTOMERS | | | TO THE CAFE PARKING. PLEASE REVIEW THE SIGNAGE | | | ALLOWANCE FOR PARKING AREA IDENTIFICATION SIGNS TO | | | VERIFY WHAT SIZE AND SETBACKS ARE PERMITTED. PLEASE | | | NOTE THAT A BUSINESS NAME/LOGO IS NOT PERMITTED ON | | | PARKING AREA DIRECTIONAL SIGNS BY RIGHT. IF A SIGN THAT | | | DOES NOT CONFORM THE BY RIGHT ALLOWANCE IS BEING | | | CONTEMPLATED, THEN A SIGN PROGRAM THAT WAIVES THE CODE | | | PROVISIONS MUST BE APPROVED BY THE CITY COMMISSION | | | EITHER AS PART OF THIS APPLICATION OR A SEPARATE FUTURE | | | MAJOR PLANNED DEVELOPMENT AMENDMENT. IF IT WILL BE | | | REVIEWED NOW, THE DETAILS MUST BE SUBMITTED FOR STAFF | | | REVIEW. | | | | | | 40) WHILE REVIEWING THE RESPONSE THAT GENERATED THE | | | PREVIOUS COMMENT, STAFF NOTED THAT NO SIGNAGE HAS BEEN | | | PROPOSED FOR THE PROPERTY. IT IS NOT REQUIRED THAT YOU | | | PROVIDE SIGN PLANS WITH THE APPLICATION; HOWEVER, THE | | | FUTURE SIGN PLANS MUST THEN COMPLY WITH ALL CODE | | | PROVISIONS. ANY WAIVERS OR DEVIATIONS FROM THE CODE | | | PROVISIONS WOULD NEED TO BE APPROVED BY THE CITY | | | COMMISSION AS A FUTURE MAJOR PLANNED DEVELOPMENT | | | AMENDMENT. ADDITIONALLY, EVEN CODE COMPLIANT | | | FREE-STANDING SIGNS ARE CHANGES TO THE SITE PLAN, SO | | | THEIR LOCATION WILL REQUIRE A FUTURE MINOR PLANNED | | | DEVELOPMENT AMENDMENT. | | | | | | LANDSCAPE | | | | | | 41) THE LANDSCAPE PLANS NEED TO BE CLEANED UP TO SHOW | | | THE FINAL CONDITIONS ONLY. THE CURRENT PLANS INCLUDE | | | TREES THAT WILL NO LONGER REMAIN WHEN THE PROJECT IS | | | COMPLETED AND STRAY LINEWORK FROM THE EXISTING SITE | | | FEATURES (EX. CURBING IN THE NORTHEAST CORNER OF THE | | | PLAN WHICH MAKES IT APPEAR THAT THERE IS A WALL ACROSS | | | THE ENTRY DRIVE FROM FLAGLER). | | | | | | 42) SHEET LG-3.1 SHOWS THE STORMWATER LINE ALONG THE | | | LENGTH OF THE WEST SIDE OF THE BUILDING WHILE SHEET | | | C-500 DOES NOT SHOW THE STORMWATER LINE IN THE SAME | | | CONFIGURATION. ALL PLANS MUST SHOW THE SAME, ACCURATE | | | CONDITIONS. | | | | | | 43) THE CIVIL AND LANDSCAPE PLANS SHOW AN FPL LINE | | | ALONG THE FLAGLER DRIVE FRONTAGE. PROVIDE A CROSS | | | SECTION SHOWING THE DUCT BANK AND ITS RELATIONSHIP TO | | | THE ROOT ZONES FOR THE OAK TREES PROPOSED ALONG FLAGLER | | | DRIVE. | | | | | | 44) SHEET LG-3.1 SHOWS PLANTING BEDS AGAINST THE WEST | | | SIDE OF THE BUILDING WHICH ARE NOT REFLECTED ON THE | | | CIVIL SHEETS OR SITE PLAN. ALL PLANS MUST SHOW THE | | | SAME, ACCURATE CONDITIONS. | | | | | | DEVELOPMENT REGULATION: FPL EASEMENT WHICH BISECTS THE | | | PROPOSED BUILDING LOCATION WILL NEED TO BE RELEASED BY | | | FPL AND ALL OVERHEAD LINES MUST BE REMOVED. ANY NEW | | | UTILITY LINES MUST BE RELOCATED UNDERGROUND. | | | | | | DEVELOPMENT REGULATION: THE IMPROVEMENTS TO THE CITY | | | OWNED PARCEL SOUTH OF THE PROPERTY, INCLUDING THE | | | SIDEWALK, WALKWAYS AND LANDSCAPE, WILL BE THE | | | MAINTENANCE RESPONSIBILITY OF THE FLAGLER TOWERS | | | PROJECT. MAINTENANCE AGREEMENTS AND EASEMENTS WILL BE | | | REQUIRED. | | | | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
06-03-2021 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
06-03-2021 |
Time |
11:50 |
Rev Time |
12.00 |
| Received By |
eschneid |
Date |
06-01-2021 |
Time |
15:36 |
Sent To |
|
|
| Notes |
| 2021-06-03 11:51:56 | CASE NO. PB 1857B | | | FLAGLER TOWERS | | | 1315 SOUTH FLAGLER DRIVE | | | | | | - CONTACT ERIC SCHNEIDER @ (561) 822-1446, | | | [email protected] | | | | | | - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN | | | WRITTEN FORMAT. | | | | | | - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF THREE | | | (3) PAPER COPIES AND AN ELECTRONIC COPY IN .PNG FORMAT | | | OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE | | | RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS | | | TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL | | | COMMENTS. | | | | | | - THE PPRC COMMENTS SHALL BE SUFFICIENTLY ADDRESSED AND | | | SUBMITTED TO THE PLANNING DIVISION BY 5 PM ON FRIDAY, | | | JUNE 25, 2021, TO BE ELIGIBLE TO BE SCHEDULED FOR THE | | | AUGUST 17, 2021 PLANNING BOARD MEETING. | | | | | | - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT | | | RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS | | | FROM THE DATE OF THE PPRC MEETING (BY AUGUST 10, 2021), | | | THE PLANNING DIVISION MAY NOTIFY THE APPLICANT THAT THE | | | CASE IS CONSIDERED WITHDRAWN. ANY FURTHER ACTION SHALL | | | REQUIRE A NEW DEVELOPMENT APPLICATION. | | | | | | - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($600). | | | | | | - PUBLIC HEARING NOTIFICATION SIGNAGE SHALL BE POSTED | | | IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION | | | 94-39(I)(5) OF THE ZONING AND LAND DEVELOPMENT | | | REGULATIONS. | | | | | | 1) THANK YOU FOR PROVIDING THE TRAFFIC STUDY THAT | | | STATES THAT THE PROJECT DOES NOT GENERATE A SIGNIFICANT | | | IMPACT. HOWEVER, YOU ARE STILL REQUIRED TO PROVIDE A | | | PALM BEACH COUNTY TPS APPROVAL LETTER. | | | | | | 2) THE SITE PLAN SHOWS A SIDEWALK AND WALKWAYS TO THE | | | TOWNHOUSE UNITS BEING INSTALLED ON THE CITY OWNED | | | PARCEL SOUTH OF THE PROJECT. THE PARCEL IS SUBJECT TO A | | | DEED RESTRICTION THAT REQUIRES THE NORTON GALLERY AND | | | SCHOOL OF ART, INC., TO BE NOTIFIED OF PROPOSED CHANGES | | | TO THE PARCEL AND NOT OBJECT TO THE CHANGES. ONCE THE | | | FULL SCOPE OF CHANGES TO THE PARCEL ARE FINALIZED | | | BETWEEN THE APPLICANT AND STAFF, IT IS YOUR | | | RESPONSIBILITY TO PROVIDE WRITTEN CONSENT FROM THE | | | NORTON GALLERY AND SCHOOL OF ART, INC., TO THE CITY. | | | THE SIDEWALK MUST BE A MINIMUM OF 10 FEET IN WIDTH AND | | | IT WILL BE THE FLAGLER TOWERS MAINTENANCE | | | RESPONSIBILITY. THERE WILL BE EASEMENTS AND OTHER | | | AGREEMENTS REQUIRED FOR THE INSTALLATION OF ANY | | | IMPROVEMENTS ON CITY PROPERTY. | | | | | | 3) FPL EASEMENT WHICH BISECTS THE PROPOSED BUILDING | | | LOCATION WILL NEED TO BE RELEASED BY FPL AND ALL | | | OVERHEAD LINES MUST BE REMOVED. ANY NEW UTILITY LINES | | | MUST BE RELOCATED UNDERGROUND. | | | | | | 4) YOU ARE REQUIRED TO SUBMIT THE FFA APPROVAL FOR THE | | | PROPOSED TOWER PRIOR TO SCHEDULING THIS CASE FOR | | | PLANNING BOARD. | | | | | | 5) PROVIDE THE LEGAL DESCRIPTION IN WORD FORMAT. | | | | | | 6) STAFF WILL NOT SUPPORT A BUILDING IN EXCESS OF 300 | | | FEET IN HEIGHT. THE PROPOSED 356-FOOT TALL TOWERS DO | | | NOT CONTINUE THE PATTERN OF BUILDINGS TRANSITIONING | | | DOWN IN HEIGHT AS THEY MOVE SOUTH ALONG SOUTH FLAGLER | | | DRIVE AND SOUTH OLIVE AVENUE TOWARD THE EXISTING LOWER | | | SCALE RESIDENTIAL NEIGHBORHOODS. | | | | | | 7) SHEET C-300 SHOWS THE SAME AT&T LINE AS REMAINING | | | AND BEING REMOVED. ALL PLANS MUST SHOW THE SAME | | | ACCURATE CONDITIONS. | | | | | | BUILDING PLACEMENT | | | | | | 8) BASED ON THE BUILDING DESIGN, YOU ARE SHOWING A | | | ZERO-FOOT NORTH SETBACK FOR THE GROUND LEVEL. PLACING | | | DIRT AND A RETAINING WALL BETWEEN THE ABOVE GRADE LEVEL | | | OF PARKING AND THE PROPERTY LINE TO THE NORTH DOES NOT | | | MAKE THAT LEVEL OF BUILDING DISAPPEAR FOR THE PURPOSES | | | OF SETBACKS. STAFF DOES NOT CURRENTLY SUPPORT THIS | | | DESIGN BASED ON THE WAIVERS THAT IT REQUIRES. | | | | | | 9) THE BUILDING SETBACK ALONG SOUTH FLAGLER DRIVE DOES | | | NOT COMPLY WITH THE THEME THAT HAS BEEN ESTABLISHED BY | | | PRIOR PROJECTS TO SET THE BUILDINGS BACK AND CREATE AN | | | ENHANCED VISUAL OPEN SPACE ALONG SOUTH FLAGLER DRIVE. | | | NOT ONLY IS THE BUILDING NOT SET BACK APPROPRIATELY, | | | BUT THE OUTSIDE STAIRWAYS FROM THE TERRACES ENCROACH | | | INTO THE MINIMUM 25-FOOT FRONT SETBACK REQUIRED IF THIS | | | WAS AN MF32 ZONING BASED PROJECT NOT LOCATED ALONG | | | SOUTH FLAGLER DRIVE. | | | | | | 10) THE TERRACE, WHILE NOT SHOWING AN EXACT SETBACK | | | DIMENSION ON THE PLANS, APPEARS TO BE APPROXIMATELY 25 | | | FEET FROM SOUTH FLAGLER DRIVE. THE TERRACE WALL EXTENDS | | | OVER EIGHT (8) FEET ABOVE THE SIDEWALK GRADE AND THUS | | | DOES NOT CREATE AN ENHANCEMENT FOR SOUTH FLAGLER DRIVE. | | | THE FIRST LEVEL OF THE TOWNHOUSE UNITS WILL NOT BE | | | VISIBLE TO A PEDESTRIAN. | | | | | | 11) THE SOUTH PORTION OF THE BUILDING (BEHIND THE | | | FOUNTAIN) IS A STAIRCASE TO UP TO THE AMENITY DECK, | | | WHICH, UNLESS OPEN TO THE PUBLIC, IS ANOTHER SECTION OF | | | THE BUILDING BROUGHT CLOSE TO SOUTH FLAGLER DRIVE WHICH | | | PROVIDES NO ACTIVE USE INTERACTION. | | | | | | 12) STAFF DOES NOT OPPOSE THE PODIUM SETBACK OF 15 FEET | | | ALONG THE SOUTH PROPERTY LINE; HOWEVER, MORE DETAIL ON | | | THE INTERACTION BETWEEN THE TOWNHOUSES AND THE PROPOSED | | | SIDEWALK IS REQUIRED. THE RENDERINGS SEEM TO INDICATE | | | THAT THE SOUTHEAST CORNER OF THE SITE WILL HAVE A HIGH | | | RETAINING WALL AT THE CORNER, WHICH DOES NOT FOSTER ANY | | | PERCEIVED INTERACTION WITH THE SITE. THE ADDITIONAL | | | DETAILING NEEDS TO SHOW THE ELEVATIONS BETWEEN THE | | | PROPOSED SIDEWALK AND THE ENTRY GARDENS. | | | | | | 13) STAFF DOES NOT SUPPORT THE WESTERN TOWER BUILT TO | | | THE 15-FOOT PODIUM LINE. THE JUSTIFICATION STATEMENT | | | GOES TO GREAT LENGTHS TO STATE HOW THE DESIGN OF THE | | | PODIUM AND THE TOWER POSITIONING LESSONS THE IMPACT OF | | | THE MASS OF THE BUILDING. STAFF HAS ACCEPTED THIS IN | | | THE PAST ONLY WHEN THE TOWER IS SETBACK FROM THE EDGE | | | OF THE PODIUM. BUILDING A 20 PLUS STORY TOWER 15 FEET | | | FROM A PROPERTY LINE ACCENTUATES THE SIZE OF THE | | | BUILDING. | | | | | | 14) THE NORTH/SOUTH PORTION OF CURRIE CRESCENT IS A | | | FRONT PROPERTY LINE, WHICH REQUIRES A 25-FOOT, NOT | | | 10-FOOT SETBACK. NOTE: THIS IS NOT A FENCE HEIGHT | | | WAIVER FOR THE WALL, SINCE THE WALL IS THE BUILDING | | | WALL THAT ENCROACHES INTO THE SETBACK. | | | | | | 15) THE EAST/WEST PORTION OF CURRIE CRESCENT IS A SIDE | | | PROPERTY LINE SO IT MUST MEET THE ONE-FOOT SETBACK FOR | | | EACH TWO FEET IN HEIGHT REQUIREMENT. THIS SECTION IS | | | NOT COVERED IN YOUR WAIVER REQUEST. | | | | | | 16) SHEET G-201 SHOWS THE BAY WINDOWS BEING 18 INCHES | | | DEEP. PLEASE EXPLAIN WHY THE WAIVER REQUEST IS FOR 36 | | | INCHES. | | | | | | 17) SHEET G-201 SHOWS THE BALCONY BEING 3 FEET 8 INCHES | | | DEEP. PLEASE EXPLAIN WHY THE WAIVER REQUEST IS FOR 5 | | | FEET. | | | | | | 18) STAFF DOES NOT OBJECT TO THE CAFE AWNINGS | | | ENCROACHING 7 FEET INTO THE WESTERN SETBACK OVER THE | | | ENTRANCES TO THE CAFE FROM THE OUTDOOR SEATING. | | | | | | 19) STAFF IS NOT PREPARED TO SUPPORT A 12-FOOT CANOPY | | | ENCROACHMENT INTO THE WEST SETBACK. THERE HAS BEEN | | | INADEQUATE JUSTIFICATION PROVIDED AS TO WHY SUCH A DEEP | | | CANOPY IS REQUIRED AT THIS ENTRANCE. | | | | | | 20) STAFF DOES NOT SUPPORT THE 12-FOOT CANOPY | | | ENCROACHMENT INTO THE SOUTH SETBACK. THE BUILDING | | | SETBACK IS ALREADY BEING REQUESTED TO BE REDUCED HAS | | | ALREADY BEEN REDUCED BY OVER 150 FEET. ENCROACHING | | | FURTHER INTO THE SETBACK IS NOT JUSTIFIED FOR THE | | | CANOPY. ADDITIONALLY, A 12-FOOT AWNING ENCROACHES INTO | | | THE REQUIRED LANDSCAPE BUFFER WHERE THE PROPOSED OAK | | | TREE IS LOCATED. | | | | | | 21) PROVIDE THE SETBACK DIMENSIONS OF THE PODIUM | | | (INCLUDING THE AMENITIES LEVEL) AND THE TWO TOWERS. | | | THIS IS THE METHODOLOGY USED ON THE NEARBY TOWERS TO | | | ESTABLISH THE BUILDING SETBACKS. | | | | | | 22) THE SITE OPEN SPACE IS INCORRECTLY CALCULATED. THE | | | AREAS SUCH AS THE MOTOR COURT AND THE DRIVE WHERE IT IS | | | ABOVE THE FIRST LEVEL OF THE BUILDING IS NOT OPEN SPACE | | | IT IS A BUILDING ROOF. | | | | | | ELEVATIONS | | | | | | 23) PROVIDE THE ELEVATION HEIGHTS OF ALL THE FEATURES | | | ON THE AMENITY DECK AND THE LEVEL 5 PLANS FOR THE ROOF. | | | | | | 24) PROVIDE THE ELEVATION HEIGHT OF THE ROOF TOP | | | MECHANICAL EQUIPMENT AND COOLING TOWER. | | | | | | 25) PROVIDE ELEVATION HEIGHTS FOR THE VARIOUS FEATURES | | | ALONG THE SOUTH FLAGLER DRIVE FRONTAGE. | | | | | | PARKING | | | | | | 26) PLEASE PROVIDE HOW THE PARKING SPACES WILL BE | | | ASSIGNED IN THE BUILDING. THERE ARE SEVERAL PRIVATE | | | GARAGES WHICH INCLUDE THREE CAR SPACES. GIVEN THAT THE | | | PARKING TABLE (PRIOR TO ANY OF THE FOLLOWING COMMENTS | | | BEING ADDRESSED) SHOWS THAT THERE IS ONLY ONE EXTRA | | | PARKING SPACE, ASSIGNING MULTIPLE UNITS MORE THAN TWO | | | PARKING SPACES DOES NOT PERMIT THE OTHER UNITS TO HAVE | | | THE REQUIRED TWO PARKING SPACES. | | | | | | 27) IS THERE A VALET? PROVIDE THE VALET PLAN. PLEASE | | | NOTE THAT VALETS ARE NOT PERMITTED TO USE THE PUBLIC | | | RIGHTS-OF-WAY FOR MANEUVERING. | | | | | | 28) HOW DOES A RESTAURANT/CAFE PARKING CUSTOMER OR A | | | GUEST KNOW WHICH PARKING ENTRANCE TO USE? | | | | | | 29) WHERE ARE THE RESTAURANT/CAFE PARKING AND GUEST | | | PARKING SPACES. THESE NEED TO BE DESIGNATED ON THE | | | PLAN. | | | | | | 30) PROVIDE A DRAWING SHOWING HOW A RESTAURANT OR CAFE | | | CUSTOMER GETS FROM THE PUBLIC PARKING TO THE RESTAURANT | | | OR CAFE. | | | | | | 31) WHO HAS ACCESS TO THE PARKING FIELD ON SHEET A-102? | | | DEPENDING ON WHO HAS ACCESS, STAFF MAY HAVE COMMENTS | | | REGARDING PARKING SPACE ACCESS AND TURN AROUND | | | DEFICIENCIES. | | | | | | 32) WHO HAS ACCESS TO THE PARKING FIELD ON SHEET A-103? | | | DEPENDING ON WHO HAS ACCESS, STAFF MAY HAVE COMMENTS | | | REGARDING PARKING SPACE ACCESS AND TURN AROUND | | | DEFICIENCIES. | | | | | | 33) ARE THE PARKING AREAS GATED? IF NOT HOW IS ACCESS | | | CONTROLLED? IF SO, PROVIDE INFORMATION ON STACKING AND | | | CALL BOXES. | | | | | | 34) THE ADA PARKING SPACE DETAILS ON SHEET A-054 DO NOT | | | CONFORM TO CITY STRIPING STANDARDS. | | | | | | 35) THE ADA PARKING SPACES DO NOT APPEAR TO THE BE | | | CLOSEST PARKING SPACES TO THE ELEVATORS LEADING TO THE | | | UPPER FLOOR RESTAURANT OR TO THE CORRIDOR LEADING TO | | | THE CAFE. PLEASE EXPLAIN. | | | | | | 36) SHOW THE DEPTH DIMENSIONS FOR THE PARKING ROWS. | | | | | | 37) THE DEAD-END PARKING ROW CONTAINING SPACES 112 AND | | | 162 MUST EITHER HAVE A MARKED TURN AROUND SPACE OR BE | | | ALL ASSIGNED PARKING SPACES IN AN AREA WHERE A | | | RESTAURANT/CAFE OR GUEST PARKER CANNOT ACCESS. | | | | | | 38) DESCRIBE HOW THE MOTOR COURT WILL FUNCTION. WILL | | | CARS BE PARKED HERE FOR ANY REASON? | | | | | | 39) THE BUILDING IS DEFICIENT IN PARKING: | | | | | | A. YOU ARE PROPOSING A LUXURY HIGH RISE BUILDING THAT | | | WILL REQUIRE ON-SITE STAFF. PLANNING STAFF REQUIRES | | | THAT YOU PROVIDE PARKING SPACES WITHIN THE PARKING LOT | | | FOR THE ON-SITE STAFF SO THAT THESE EMPLOYEES ARE NOT | | | REQUIRED TO PARK IN THE SURROUNDING NEIGHBORHOODS. | | | PLEASE PROVIDE HOW MANY RESIDENTIAL STAFF WILL ON-SITE | | | AT PEAK TIME SO THE PROPER NUMBER OF SPACES CAN BE | | | DETERMINED. | | | B. ONLY THE OUTSIDE TANDEM PARKING SPACE MAY COUNT | | | TOWARD MEETING THE PARKING REQUIREMENT. | | | C. SPACES 1 AND 2 ON THE BASEMENT LEVEL DO NOT HAVE | | | ADEQUATE BACK OUT MANEUVERING ROOM AND THUS DO NOT | | | FUNCTION. | | | D. PARKING SPACE 82 DOES NOT PROVIDE SAFE | | | INGRESS/EGRESS TO THE SPACE GIVEN THE PROXIMITY TO THE | | | GARAGE ENTRANCE AND THE WALLS. | | | | | | 40) HOW DOES THE PERSON PARKING IN SPACE 110 LEAVE THE | | | GARAGE? | | | | | | 41) PROVIDE THE ANGLE OF PARKING SPACES 131 AND 132 AND | | | PROVIDE DIMENSION LINES TO VERIFY THAT THEY MEET THE | | | CODE REQUIRED BACK UP DISTANCE. | | | | | | 42) NO BICYCLE PARKING WAS PROVIDED. | | | | | | A. YOU MUST HAVE BICYCLE PARKING FOR THE | | | CAFE/RESTAURANT USERS LOCATED ON THE SOUTH OLIVE AVENUE | | | SIDE OF THE SITE. | | | B. YOU MUST HAVE A BICYCLE STORAGE ROOM FOR RESIDENTS. | | | C. YOU MUST HAVE BICYCLE PARKING FOR GUESTS NEAR ONE OF | | | THE GUEST ACCESSIBLE ENTRANCES TO THE BUILDING. | | | | | | 43) PROVIDE MORE DETAIL ON THE PROPOSED PRE-WIRING OF | | | THE BUILDING FOR EV CHARGER INSTALLATION. THERE ARE A | | | NUMBER OF SPACES THAT ARE HEAD TO HEAD AS WELL AS THE | | | TANDEM SPACES THAT DO NOT SEEM TO HAVE SPACE FOR | | | CHANGING UNITS. PLEASE REMEMBER THAT THE ELECTRICAL | | | ROOM NEEDS TO INCLUDE EXTRA SPACE FOR THE ADDITIONAL | | | PANELS. | | | | | | LOADING/ACCESS | | | | | | 44) THE NORTH SIDE OF CURRIE CRESCENT HAS ON-STREET | | | PARALLEL PARKING SPACES. THE TRUCK TURNING DIAGRAM | | | SHOWS THE TRUCK USING THE FULL WIDTH OF CURRIE | | | CRESCENT, WHICH IS IMPOSSIBLE IF A CAR IS PARKED IN THE | | | PARALLEL SPACES, AND THUS IS NOT PERMITTED. | | | | | | 45) WHERE WILL A FULL-SIZED MOVING TRUCK PARK FOR THE | | | RESIDENTIAL PORTION OF THE PROJECT? | | | | | | 46) WHAT IS THE PLAN FOR GARBAGE PICK-UP? | | | | | | 47) THE CITY'S ENGINEERING SERVICES DEPARTMENT NEEDS TO | | | APPROVE THE USE OF CURRIE CRESCENT FOR MANEUVERING | | | PRIOR TO THE CASE PROCEEDING THROUGH THE PUBLIC HEARING | | | PROCESS. | | | | | | 48) THE CITY'S ENGINEERING SERVICES DEPARTMENT NEEDS TO | | | APPROVE THE NUMBER OF ACCESS POINTS TO CURRIE CRESCENT | | | AND THE SEPARATION OF ACCESS POINTS TO THE CASE | | | PROCEEDING THROUGH THE PUBLIC HEARING PROCESS. | | | | | | TOWNHOUSE UNITS | | | | | | 49) PLEASE PROVIDE A SAMPLE FLOOR PLAN ON HOW THE | | | TOWNHOUSE UNITS WILL WORK. THE LINEWORK ON LEVEL ONE | | | SEEMS TO SHOW WHAT APPEAR TO BE 16 TOWNHOUSES. | | | | | | WALLS | | | | | | 50) THE PROPOSED USE INCLUDES NON-RESIDENTIAL USES SO A | | | SCREEN WALL IS REQUIRED ALONG THE NORTH AND SOUTH | | | PROPERTY LINES. THE CITY COMMISSION, ON BEHALF OF THE | | | CITY, WHO OWNS THE PROPERTY TO THE SOUTH MAY WAIVER THE | | | REQUIREMENT AS PART OF THE RPD, BUT YOU HAVE NOT | | | REQUESTED THIS WAIVER. PROVIDE VERIFICATION THAT THE | | | WALL ALONG THE ENTIRE NORTH PROPERTY LINE COMPLIES WITH | | | THE SECTION 94-443A.1 REQUIREMENTS OR THAT THE PROPERTY | | | OWNER TO THE NORTH HAS GRANTED A WAIVER FOR THE | | | REQUIRED WALL. NOTE: AN EARLIER COMMENT RELATES TO THE | | | NORTH PROPERTY LINE AND ITS DESIGN. | | | | | | 51) WALL HEIGHTS ARE MEASURED FROM THE ACTUAL GRADE ON | | | THE EXTERIOR OF THE WALL, NOT THE MEAN GRADE OF THE | | | PROPERTY USED FOR BUILDING HEIGHT. UPDATE YOUR WALL | | | HEIGHT PLANS, CROSS SECTIONS AND REQUIRED WAIVERS TO | | | COMPLY. | | | | | | 52) NO INFORMATION IS PROVIDED ABOUT WHAT APPEARS TO BE | | | A WALL WITH STEPS AT THE SOUTHWEST CORNER OF THE SITE. | | | | | | CAFE/RESTAURANT | | | | | | 53) PROVIDE A DIAGRAM SHOWING HOW A PUBLIC CUSTOMER | | | ACCESSES THE RESTAURANT. | | | | | | 54) SHEET LG-3.1 CALLS OUT THE SURFACE AS SOD AT THE | | | AREA SHOWN AS OUTDOOR SEATING FOR THE CAFE ALONG SOUTH | | | OLIVE AVENUE. THERE ARE DISCREPANCIES ON THE VARIOUS | | | PLANS AS TO WHAT THE AREA IN FRONT OF THE CAFE LOOKS | | | LIKE ON THE VARIOUS PLANS. ALL PLANS MUST SHOW THE | | | SAME, ACCURATE CONDITIONS. | | | | | | |
|
|
| |