Plan Review Details - Project Z21020008
| Plan Review Stops For Project Z21020008 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
03-05-2021 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
03-05-2021 |
Time |
15:46 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
02-02-2021 |
Time |
15:52 |
Sent To |
|
|
| Notes |
| 2021-03-05 15:51:50 | 1.BUILDING FOOTPRINT AT FLOOR 7 AND 8 NEEDS TO BE | | | ADJUSTED TO REFLECT THE POOL AND AND BALLROOM DECK | | | EXTENSION. PLEASE CONFIRM THE MAXIMUM BUILDING | | | FOOTPRINT DOES NOT EXCEED THE MAXIMUM ALLOWED PER | | | FLOOR. | | | 2.SHEET A0.07 NEEDS TO BE ADJUSTED TO REFLECT THE | | | CHANGES IN FAR INDICATED IN SHEET A0.06. A0.06 SHOWS | | | REVISED GBA AT 806,310 VS PREVIOUS 824,645SF. WAS THE | | | TOTAL GBA REDUCED? | | | 3.SHEET A1.07 SHOWS A ROOM LABEL STAFF HK AND LAUNDRY | | | AS OFFICE SPACE. IF THIS SPACE IS TO BE COUNTED FOR | | | CLASS A OFFICE SPACE IT CAN NOT BE USED BY THE HOTEL. | | | 4.ON THE SOUTH ELEVATION, THE GREEN WALL USED TO EXTEND | | | FROM THE 6TH TO THE 7TH FLOOR. NOW THE ELEVATION SHOWS | | | A WALL WITH NO GREEN SCREEN. PLEASE EXPLAIN. | | | 5.IS THE PROPOSED EAST FA?ADE CORRECT? THE GREEN WALL | | | EXTENDS ABOVE THE 7TH FLOOR WHERE THE POOL IS? THE EAST | | | ELEVATION DOES NOT SHOW THE GREY BAND AT FLOOR 6TH | | | SHOWN ON THE SOUTH ELEVATION. HOW DOES THIS WORK? | | | PLEASE SUBMIT ONE FULL SET WITH REVISIONS AND AN CD | | | WITH ELECTRONIC COPY OF ALL DOCUMENTS. | | | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA | | | APONTE AT 561-822-1439. |
|
|
| |