Plan Review Details - Project Z20120016
Plan Review Stops For Project Z20120016
Review Stop AIPP ART IN PUBLIC PLACES
Rev No 1 Status P Date 05-12-2021 Cont ID  
Sent By scwelter Date 01-11-2021 Time 10:24 Rev Time 0.00
Received By rrossano Date 05-12-2021 Time 10:20 Sent To  
Notes
2021-05-12 10:19:56THE PUBLIC ART PASS IS CONTINGENT ON THE FOLLOWING:
 AT THE TIME OF BUILDING PERMIT SUBMITTAL, A COMPLETED
 PUBLIC ART ASSESSMENT APPLICATION, EVIDENCE OF ESCROW
 FOR THE 1%, BUDGET OF THE PROPOSED CONCEPT ALONG WITH
 OTHER ARTWORKS OR BALANCE AS A DEPOSIT TO THE CITY MUST
 BE COMPLETED.
 PLEASE SUBMIT THE ABOVE TO [email protected], AND COPY
 [email protected], [email protected] AND [email protected] WHEN
 SUBMITTING FOR BUILDING PERMIT.
 PROPOSED ART CONCEPT OF THE ARTIST WORK FOR THE GARAGE
 WAS PRESENTED TO THE ARTLIFE COMMITTEE AS A CONCEPT AND
 NON-ACTION ITEM ON MAY 5, 2021.
 DEVELOPER MUST STILL PROVIDE BUDGET BREAKDOWN OF THE 1%
 INCLUDING VALUE OF PROPOSED CONCEPT, MATERIALS,
 MAINTENANCE PLAN ADDRESSING FLORIDA?S CLIMATE AND
 STREET NAMES (INTERSECTIONS) OF THE VARIOUS VANTAGE
 POINTS.
  
2021-01-11 11:01:02PROPOSED ARTWORK IS TEMPORARY IN NATURE.
 MATERIAL HAS A SHORT LIFE SPAN IN SOUTH FLORIDA WEATHER
 (HEAT, HUMIDITY, SALT, AND RAIN)
 PROPOSED WORK WILL REQUIRE IN FIVE YEARS A COMPLETE
 RE-APPLICATION MAKING THIS A HIGH MAINTENANCE PROJECT
 DOES NOT COMPLY WITH VISUAL ACCESSIBILITY AS THE ARTIST
 HAS STATED THAT THERE ARE SPECIFIC VANTAGE POINTS TO
 ?SEE? THE ARTWORK
 HAVING ONLY TWO VANTAGE POINTS TO VIEW THAT WORK POSES
 A SAFETY HAZARD INCLUDING ADA COMPLIANCE
 THE VALUE OF THE WORK IS UNDER THE 1%
 THE WORK IS NOT APPROPRIATE FOR THE SITE IN DESIGN,
 SCALE AND MATERIALS.
 DISTINCT ARTWORK SECTION 78-129 (B)(D): ARTWORK FOR
 COMPLIANCE WITH THE PUBLIC ART ASSESSMENT WILL NOT BE
 CONSIDERED AS COMPLIANT WITH ANY REQUIREMENTS OF THE
 ZONING AND LAND DEVELOPMENT REGULATIONS. ANY
 REQUIREMENTS FOR THE PARKING GARAGE MAY NOT BE
 CONSIDERED AS PART OF THE PUBLIC ART REQUIREMENT.
 I RECOMMENDED IN MY 10.27.2020 EMAIL TO JON SCHMIDT
 THAT THE PASEO BE CONSIDERED FOR THE LOCATION OF
 MULTIPLE ARTWORKS.
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 01-07-2021 Cont ID  
Sent By rrossano Date 01-13-2021 Time 10:21 Rev Time 0.00
Received By rbrown Date 01-13-2021 Time 19:06 Sent To  
Notes
2021-01-13 19:36:46DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR THE BUILDING PERMIT APPLICATION.
  
 2. NUMBER OF ACCESSIBLE PARKING SPACES. THE DATA TABLE
 ON SITE PLAN, SHEET A-100, AND PRJECT DATA PLAN SHEET
 A001, STATES THAT 1200 PARKING SPACES PROVIDED. THE
 NUMBER OF ACCSEEIBLE PARKING SPACES SHALL BE BASED ON
 THE NUMBER OF PARKING SPACES PROVIDED SO 24 ACCESSIBLE
 PARKING SPACES ARE REQUIRED. THE MINIMUM NUMBER OF
 ACCESSIBLE PARKING SPACES PROVIDED SHALL BE IN
 ACCORDANCE WITH SECTION 208.2 OF FLORIDA ACCESSIBILITY
 CODE.
  
 3. VAN ACCESSIBLE PARKING SPACES. THE PLANS DO NOT
 LABEL ANY OF THE ACCESSIBLE PARKING SPACES AS VAN
 ACCESIBLE. 4 VAN ACCESSIBLE PARKING SPACES ARE
 REQUIRED. PER SECTION 208.2.4 OF FLORIDA ACCESSIBILITY
 CODE, ONE IN EVERY SIX REQUIRED ACCESSIBLE SPACES (AT
 LEAST ONE) IN A PARKING STRUCTURE, SHALL BE ?VAN
 ACCESSIBLE? AND DESIGNED IN ACCORDANCE WITH SECTION OF
 502 OF FLORIDA ACCESSIBILITY CODE (VERTICAL CLEARANCE
 NOT LESS THAN 98 INCHES AT SPACE AND VEHICULAR ACCESS
 ROUTE)
  
 4. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT,
 THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR
 THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT,
 AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE
 FLORIDA BUILDING CODE.
  
 5. ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE DOES
 NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL OPENINGS TO
 MEET THE DEFINITION OF AN OPEN PARKING GARAGE, IT WILL
 BE CONSIDERED AN ENCLOSED PARKING GARAGE AND MUST HAVE
 EXHAUST SYSTEMS. THE EXHAUST SYSTEMS SHALL BE DESIGNED
 TO MINIMIZE NOISE LEVELS USING INLINE FAN SILENCERS OR
 OTHER APPROVED METHODS.
  
 6. PARKING STRUCTURE ROOF ACCESS. SHEET A111 DOE NOT
 CLEARLY SHOW/LABEL WHAT IS ON THE PARKING STRUCTURE
 ROOF. IS THERE ANY PROPOSED BUILDING OCCUPANT ACCESS TO
 THE PARKING STRUCTURE ROOF? IF SO, PLEASE PROVIDE THE
 OCCUPANT COUNT.
  
 7. GREASE INTERCEPTOR. GREASE INTERCEPTORS MAY BE
 REQUIRED IF ANY OF THE RETAIL SPACES MIGHT BE
 RESTAURANTS. FOR INFORMATION ON THE REQUIRED TYPE, SIZE
 AND LOCATION, PLEASE CONTACT TIM LARGE, CHIEF PLUMBING
 INSPECTOR, DEVELOPMENT SERVICES DEPARTMENT, AT (561)
 805-6692, OR BY EMAIL: [email protected]
  
 8. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS,
 GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND
 OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS,
 SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC.
  
 9. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND
 CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF
 CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL
 NEIGHBORING PROPERTIES.
  
 10. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER
 AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY,
 INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE
 CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF
 NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION
 THAT MAY AFFECT THE USE OF THEIR PROPERTY.
  
 11. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT
 WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL
 HAVE A SEPARATE ADDRESS ASSIGNED BASED ON THE LOCATION
 OF THE BUILDING ENTRANCE. FOR STREET ADDRESSING,
 CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT
 (561) 805 6659, OR BY EMAIL: [email protected]
  
 12. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT
 TO ART IN PUBLIC PLACES (AIPP) ASSESSMENT. FOR ADVICE
 ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP
 ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC
 PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL:
 [email protected]
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 4 Status F Date 12-23-2021 Cont ID  
Sent By rrossano Date 12-23-2021 Time   Rev Time 0.00
Received By rrossano Date 12-23-2021 Time   Sent To  
Notes
2021-12-23 10:16:23NO COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR,
 ENG. SERVICES DEPT., 561-494-1098 [email protected] :
  
 COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPER., WPB PUBLIC UTILITIES, 561-494-2262 OR
 [email protected]:
  
 -COULD NOT FIND RESPONSE LETTER IN RESUBMITTAL PACKAGE.
 DID NOT HAVE RESPONSE BACK FROM LAST REVIEW COMMENTS:
 PLEASE VERIFY ROOT BARRIERS ARE NOT NEEDED FOR THE CITY
 PARKS METERED WATER SERVICE NEAR THE NORTHWEST AREA OF
 PROPERTY;
 WATER DEMAND CALCULATIONS HAD FOOD OPERATIONS ITEM AND
 SEE CAFE ON PLANS, BUT DID NOT SEE ANY GREASE TRAPS.
 ARE ANY NEEDED?;
 THE EXIT DRIVEWAY CURBING NEAR THE NORTH PROPERTY LINE
 ON THE CIVIL PLANS DOES NOT MATCH THE SITE PLANS OR
 LANDSCAPING PLANS. PLEASE MAKE SURE ALL PLAN SETS
 MATCH. IF CIVIL PLANS ARE ALTERED, SEE IF ANY CONFLICTS
 ARISE WITH THE VEHICLE CIRCULATION PLANS.
  
 -AREA OF DETECTABLE TACTILE PADS NEAR DRIVEWAYS DOES
 NOT MATCH BETWEEN ALL PLAN SETS. PLEASE UPDATE ALL PLAN
 SETS SO THAT THEY MATCH.
  
 -ARE THE PEDESTRIAN REFUGES LEVEL WITH THE DRIVEWAYS
 WITHOUT RAISED ELEVATIONS?
  
 -ON THE CIVIL PLANS A COUPLE OF THE SOUTHERN BIKE RACKS
 APPEAR TO BE CONFLICTING WITH TREE TRUNKS BUT THEY LOOK
 ON THE LANDSCAPING PLANS. PLEASE UPDATE AS NEEDED.
  
 COMMENTS FROM MICHAEL TECHNOW, PROJECT ENGINEER, WPB
 PUBLIC UTILITIES, 561-494-1047, [email protected] :
  
 -NO 3? SERVICE. USE 1? OR 4?.
 -NEED PROFILE OF WATER MAIN TIE IN SHOWING EXISTING
 UTILITIES AND CONFLICTS.
 -ADD NOTE THAT THIS IS IN LIFT STATION #40.
 -PROPOSED 8? PVC SANITARY IS TOO CLOSE TO THE FPL DUCT
 BANK.
 -WHEN 8? SANITARY LINE IS USED INSTALL A MANHOLE
 INSTEAD OF CLEAN OUT OR USE AN 8? CLEAN OUT.
 -IF NO EASEMENT IS PROVIDED THAN THE CLEAN OUT NEEDS TO
 BE IN THE RIGHT OF WAY.
 -SHOW PROFILE OF 8? CONNECTIONS WITH CONFLICTS AND
 CROSSINGS.
 -USE FDOT RESTORATION DETAIL.
 -MANHOLES NEED TO BE LEGIBLE ON DIXIE.
 -ADD NOTE TO LINE EXISTING GRAVITY SEWER AS THEY WILL
 BE CUTTING INTO IT.
 -SHOW EXISTING LATERALS ON GRAVITY MAIN. SHOW EXISTING
 WATER SERVICES.
 -PROVIDE POST CCTV OF PROPOSED LATERALS.
 -WHY PARKS AND REC REFERENCE?
 -ONCE SOFT DIGS AND POTHOLE REPORT HAS BEEN SUBMITTED
 WE WILL REASSESS.
 -?INSET A? IS UNDER REVIEW. WHY FIVE TAPS? WHY NOT
 GROUP AND SPLIT?
  
 COMMENTS FROM TRACY WARD, SR. STORMWATER ENG., CITY OF
 WPB ENG. SERVICES, [email protected], 561-494-1120:
  
 THE STREETS SURROUNDING THE DEVELOPMENT ARE MAINTAINED
 BY FDOT. FDOT WILL NEED TO APPROVE THE PROPOSED
 LANDSCAPING AND BIKE RACKS IN THE RIGHTS-OF-WAY AS WELL
 AS THE SIDEWALK AREAS SLOPING TOWARD THE RIGHTS-OF-WAY.
  
 THE PROPOSED 18? PIPE LEAVING STRUCTURE OCS-2 CONNECTS
 TO A DRAINAGE STRUCTURE WITH ONLY 15? DIAMETER PIPE
 LEAVING THE STRUCTURE.
  
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 3 Status F Date 06-15-2021 Cont ID  
Sent By rrossano Date 06-15-2021 Time   Rev Time 0.00
Received By rrossano Date 06-15-2021 Time   Sent To  
Notes
2021-06-15 07:02:051. PLEASE SHOW PAVEMENT RESTORATION AT SCALE FOR CITY
 MAINTAINED ROADWAYS PER CITY OF WPB STANDARD DETAIL
 GC-8.
 2. PLEASE CONFIRM ALL STANDARD DETAILS ARE CURRENT
 VERSIONS. LATEST CAD VERSIONS CAN BE OBTAINED FROM
 JANICE TARBILL AT [email protected]
 3. PLEASE PROVIDE UPDATE ON STATUS OF REQUESTED CCTV.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT, (561) 494-1098 [email protected]
  
 THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD
 CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES,
 PLEASE CONTACT 561-494-2262 OR [email protected]:
 -PLEASE VERIFY ROOT BARRIERS ARE NOT NEEDED FOR THE
 CITY PARKS METERED WATER SERVICE NEAR THE NORTHWEST
 AREA OF PROPERTY.
  
 -WATER DEMAND CALCULATIONS HAD FOOD OPERATIONS ITEM AND
 SEE CAFE ON PLANS, BUT DID NOT SEE ANY GREASE TRAPS.
 ARE ANY NEEDED?
  
 -THE EXIT DRIVEWAY CURBING NEAR THE NORTH PROPERTY LINE
 ON THE CIVIL PLANS DOES NOT MATCH THE SITE PLANS OR
 LANDSCAPING PLANS. PLEASE MAKE SURE ALL PLAN SETS
 MATCH. IF CIVIL PLANS ARE ALTERED, SEE IF ANY CONFLICTS
 ARISE WITH THE VEHICLE CIRCULATION PLANS.
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 2 Status F Date 04-22-2021 Cont ID  
Sent By rrossano Date 04-22-2021 Time   Rev Time 0.00
Received By rrossano Date 04-22-2021 Time   Sent To  
Notes
2021-04-22 11:27:02THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD
 CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES,
 PLEASE CONTACT 561-494-2262 OR [email protected]:
  
 -PLEASE ADD NOTE OR LABEL TO UTILITY PLAN INCORPORATING
 RESPONSE TO PRIOR COMMENT ABOUT BUILDING STRUCTURES
 ENCROACHING ON EXISTING UTILITY EASEMENTS.
  
 -PLEASE ADD MORE DESCRIPTION TO LABEL OF 6 INCH METER
 ON INSET A OF UTILITY PLAN DESCRIBING WHAT THE WATER
 METER IS FEEDING, SIMILAR TO THE 3 INCH METER.
  
 -SHOW AND LABEL DRAINAGE FOR FIREROOM ON INSET A OF
 UTILITY PLAN.
  
 -THE BYPASSES FOR THE LARGE WATER METERS MAY NOT BE
 SHOWN TO SCALE ON UTILITY PLAN AND MAY EXTEND CLOSER TO
 THE BOLLARDS.
  
 -FURTHER FEEDBACK/DIRECTION ON THE WATER MAIN WORK MAY
 BE PROVIDED AT FORMAL ENGINEERING SUBMITTAL.
  
 -PAVEMENT RESTORATION BOUNDARIES APPEAR SMALLER THAN
 REQUIRED BY STANDARDS. PLEASE SHOW THE ADDITIONAL
 PAVEMENT RESTORATION BOUNDARIES FOR THE SEWER WORK IN
 THE STREETS AND MAKE SURE BOUNDARIES COMPLY WITH
 STANDARDS.
  
 -WPB GIS AND ASBUILT SHOW EXISTING 8 INCH SEWER LATERAL
 AT EAST SIDE OF PROPERTY NEAR PROPOSED 6 INCH C900.
 PLEASE CONFIRM IF STILL THERE AND SHOW AND LABEL AS
 NEEDED.
  
 -TRAFFIC ARROWS ARE MISSING FOR SOUTHERN DRIVEWAY ON
 UTILITY PLAN. PLEASE ADD.
  
 -CONFIRM THAT THE PROPOSED 8 INCH SEWER LATERALS MAY
 HAVE 6 INCH CLEANOUTS.
  
 -VERIFY FIRE HYDRANTS HAVE THE NECESSARY CLEARANCE
 DISTANCES REQUIRED BY STANDARD DETAIL P-8.
  
 -FIRE HYDRANTS APPEAR TO BE HALF IN PLANTERS AND HALF
 IN SIDEWALKS. CAN PLANTERS BE EXTENDED SLIGHTLY AT
 THOSE AREAS SO THAT THE FIRE HYDRANTS ARE COMPLETELY IN
 THE PLANTER?
  
 -THE PROXIMITY OF SOME OF THE WATER UTILITIES TO TREES
 IS STILL CONCERNING. PLEASE ENSURE BOTH IRRIGATION
 METERS AND FIRE HYDRANTS HAVE ADEQUATE CLEARANCE
 DISTANCE. IF ROOT BARRIERS ARE BEING UTILIZED, PLEASE
 SHOW THOSE ON LANDSCAPE PLAN.
  
 -PARKS EXISTING METERED IRRIGATION SERVICE CURRENTLY
 HAS 2 INCH METER. RELOCATED WATER SERVICE ONLY SHOWS 1
 INCH METER. PLEASE CONFIRM THAT WPB PARKS APPROVED THE
 SIZE REDUCTION. ALSO ENSURE THAT A BACKFLOW CAGE IS
 INSTALLED IF REQUIRED BY PARKS.
  
 -PLEASE SHOW AND DESCRIBE HOW WPB UTILITY WORKERS WILL
 ACCESS THE WATER METERS THAT ARE ON THE FIRELINE
 BACKFLOW ASSEMBLIES IN THE FIREROOM.
  
 -PROPERTY OWNER WILL BE REQUIRED TO SUBMIT AND RECORD
 BACKFLOW COVENANT. CONTACT [email protected] FOR TEMPLATE
 AND DIRECTION.
  
 -CHECK SOUTHERN-MOST FLAG POLE ON WEST SIDE OF PROPERTY
 TO SEE IF IT CONFLICTS WITH DRAINAGE UTILITY.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT, (561) 494-1098 [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status F Date 01-07-2021 Cont ID  
Sent By rrossano Date 01-07-2021 Time   Rev Time  
Received By rrossano Date 01-07-2021 Time   Sent To  
Notes
2021-01-07 10:23:131. THE CITY OF WEST PALM BEACH HAS A NUMBER OF
 REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY
 AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND
 WASTEWATER UTILITIES WITHIN THE CITY. TO VIEW
 DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AND OTHER
 ENGINEERING RELATED DOCUMENTS, OPEN A BROWSER IN CHROME
 AND GO TO: WWW.WPB.ORG/ENGDOCS . TO LOGIN, UNDER
 ?EMAIL? ENTER [email protected] ; UNDER ?PASSWORD? ENTER
 SIMPLE321#
 THERE ARE 4 PAGES OF AVAILABLE ENGINEERING DOCUMENTS
 FOR YOUR USE.
 2. CODE OF ORDINANCES, CITY OF WEST PALM BEACH,
 FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, ADOPTED
 SEPT. 22, 2008. (SUPPLEMENT NO. 18) CHAPTER 90
 UTILITIES, ARTICLE I. SEC. 90-7.
 POLICY REGARDING EXTENSION OF WATER OR SEWER SERVICE
 FACILITIES OF THE CITY:
 THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE
 CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY
 BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS,
 BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION.
 3. AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR
 MORE INFORMATION, OPEN A BROWSER IN CHROME AND GO TO:
 WWW.WPB.ORG/ENGDOCS .TO LOGIN, UNDER ?EMAIL? ENTER
 [email protected] ; UNDER ?PASSWORD? ENTER SIMPLE321#
 CROSS-CONNECTION CONTROL MANUAL IS ON PAGE 4.
 4. PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY
 OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC
 RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF
 YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE
 MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL
 IN THE WPB ENGINEERING SERVICES DEPARTMENT AT
 [email protected] OR 561-494-1040 FOR FURTHER
 ASSISTANCE.
 5. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS
 OF ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES,
 INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND
 SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES,
 METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE
 SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING
 GRADES, PIPES SIZES, MATERIALS, ELEVATIONS,
 ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL
 INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER
 LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE
 PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN
 VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS.
 PLEASE SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL
 EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT,
 INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES LOCATED ON THE
 RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL
 UTILITY CROSSINGS.
 6. CUT AND CAP UTILITIES NOT IN USE, AND REMOVE ANY
 ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY
 ROW.
 7. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE
 DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB
 DEVELOPMENT APPLICATION).
 8. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM
 AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE
 PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER.
 9. SHOW VERTICAL DATUM AND DATUM CONVERSION INFORMATION
 (NAVD 88 AND NGVD 29).
 10. PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND
 STORMWATER ALONG ENTIRE PROJECT FRONTAGE.
 11. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND
 IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED
 AREAS.
 12. PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR
 PROPOSED SANITARY LATERALS.
 13. PLEASE LABEL WATER LINES AS PRIVATE WHERE
 APPLICABLE.
 14. PLEASE PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED
 LOCATION OF WATER METER AND BACKFLOW PREVENTION.
 15. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING
 PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT
 HIM AT 561-494-2262 OR [email protected]
 16. PROVIDE DEDICATED UTILITY EASEMENTS TO ALLOW ACCESS
 FOR CITY PERSONNEL TO PROPOSED UTILITY WATER METERS.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS. RICK ROSSANO, PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPARTMENT, (561) 494-1098
 [email protected]
  
 THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD
 CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES,
 PLEASE CONTACT 561-494-2262 OR [email protected]:
  
 -BUILDING STRUCTURES SHOULD NOT ENCROACH ON UTILITY
 EASEMENTS.
  
 -WEST SIDE OF BUILDING LOOKS LIKE IT MAY EXTEND INTO
 R/W. VERIFY IF THAT IS ACCEPTABLE.
  
 -EXISTING FIRE HYDRANT AT SOUTHEAST AREA OF PROPERTY
 NEED UTILITY EASEMENT.
  
 -VERIFY IF THE 14FOOT UTILITY EASEMENT ON NORTH SIDE OF
 THE PROPERTY IS EXTENDING DOWN MIDWAY ON THE EAST AND
 WEST SIDES OF THE PROPERTY. IF SO, PLEASE LABEL MORE
 CLEARLY ON UTILITY PLAN.
  
 -ENSURE THAT WATER METERS ARE OUT OF HEAVY PEDESTRIAN
 TRAFFIC.
  
 -THE 3INCH AND 6INCH METERS NEED TO BE ABOVE-GROUND
 INSTALLATION USING STANDARD DETAIL WS-3.
  
 -VERIFY THAT WATER SERVICES DO NOT HAVE TREE CONFLICTS
 WITH ROOTS. LANDSCAPING PLAN SHOWS MANY TREES NEAR THE
 WATER SERVICES. IF CONFLICT INCREASE CLEARANCE DISTANCE
 AND ADD ROOT BARRIERS.
  
 -CAN THE WATER SERVICES BE DESIGNED SO THAT THE
 PLUMBING DOES NOT CROSS?
  
 -LANDSCAPING PLAN DOES NOT SHOW THE ABOVE-GROUND
 BACKFLOW ASSEMBLIES. PLEASE ADD ICONS FOR THE BACKFLOW
 ASSEMBLIES TO LANDSCAPING PLAN.
  
 -INSET A ON UTILITY PLAN HAS A VERTICAL DASHED LINE.
 HAVING TROUBLE FIGURING OUT WHAT IT IS ? PLEASE LABEL
 IT.
  
 -CONSIDER DUAL/PARALLEL BACKFLOW ASSEMBLIES FOR THE
 LARGE METERS SO THAT WATER OUTAGES ARE MINIMIZED DURING
 BACKFLOW MAINTENANCE.
  
 -SOME DISTANCES FROM THE WATER METERS TO THE BACKFLOW
 ASSEMBLIES ARE EXCESSIVE. TRY TO REDUCE THOSE
 DISTANCES.
  
 -PLEASE ADD VISUAL MEASUREMENT ICON TO THE SCALE FOR
 INSET A ON UTILITY PLAN.
  
 -PLANS DO NOT SHOW PAVEMENT RESTORATION ON OKEECHOBEE
 OR QUADRILLE FOR THE UTILITY WORK BEING COMPLETED IN
 THE ROADWAY.
  
 -FOR THE FORMAL ENGINEERING SUBMITTAL, PLEASE ADD THE
 FOLLOWING TO THE UTILITY PLAN: WATER DEMAND
 CALCULATIONS, ADDRESS, AND STANDARD DETAIL COPIES (ON
 SEPARATE PAGE).
  
 -A WATER SERVICE ON WEST SIDE OF PROPERTY IS PROPOSED
 TO BE REMOVED, BUT IT IS A CITY PARKS WATER SERVICE.
 APPROVAL WOULD BE NEEDED FROM CITY PARKS DEPARTMENT AND
 THEY MAY REQUIRE IT TO BE RELOCATED.
  
 -CANNOT FIND AN FDC SHOWING ON THE UTILITY PLAN FOR THE
 FIRE SYSTEM. IS ONE NEEDED?
  
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 06-22-2021 Cont ID  
Sent By pleduc Date 06-22-2021 Time   Rev Time 0.00
Received By pleduc Date 06-22-2021 Time 11:49 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 05-06-2021 Cont ID  
Sent By pleduc Date 05-06-2021 Time   Rev Time 0.00
Received By pleduc Date 05-06-2021 Time 13:39 Sent To  
Notes
2021-05-06 13:40:08FIRE HAS NO OBJECTIONS TO THE PROPOSED AND APPROVES.
  
 FIRE'S APPROVAL OF THIS SUBMITTED PROJECT DOES NOT
 CONSTITUTE IT'S FINAL REVIEW OR APPROVAL.
  
 FIRE SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT THE
 APPROPRIATE TIME AND IN ACCORDANCE WITH THE
 REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 01-06-2021 Cont ID  
Sent By pleduc Date 01-06-2021 Time   Rev Time 0.00
Received By pleduc Date 01-06-2021 Time 14:19 Sent To  
Notes
2021-01-06 15:07:38THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC,
 FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM
 BEACH FIRE RESCUE.
  
 THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE
 DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE.
 ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS
 ARE SUBMITTED FOR PERMIT.
  
 THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE
 PROPOSED PROJECT.
  
 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY
 WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE
 PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A
 PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED
 TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN
 STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY
 MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER
 PROTECTION.
  
 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY
 IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING
 ALL CONSTRUCTION ACTIVITIES.
  
 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM
 ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION.
 ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND
 AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT
 WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS.
  
 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE
 REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE
 ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS.
  
 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH
 THE CURRENT EDITION OF THE FLORIDA FIRE PREVENTION
 CODE, INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE
 CODES.
  
 6. ALL PARKING STRUCTURES SHALL COMPLY WITH NFPA 88A,
 PARKING STRUCTURES AND NFPA 101, THE LIFE SAFETY CODE,
 INCLUDING MORE SPECIFICALLY, CHAPTER 42 STORAGE
 OCCUPANCIES (PARKING STRUCTURES)
  
 7. A NFPA 13 COMPLAINT FIRE SPRINKLER SYSTEM AND NFPA
 14 COMPLIANT WET STANDPIPE SYSTEM ARE REQUIRED FOR THIS
 STRUCTURE. TEMPORARY STANDPIPES ARE REQUIRED WHEN THE
 BUILDING REACHES THREE LEVELS OR THIRTY FEET WHILE
 BEING CONSTRUCTED.
  
 SEPARATE SHOP DRAWINGS, ARE REQUIRED TO BE SUBMITTED,
 REVIEWED AND APPROVED BY THE FIRE PREVENTION BUREAU
 PRIOR TO ANY INSTALLATION.
  
 IT IS RECOMMENDED FOR HIGH RISES TO HAVE TWO SEPARATE
 FDC LOCATIONS REMOTELY LOCATED WITH 100 FT OF FIRE
 HYDRANT. CONSIDER ONE ON OKEECHOBEE NEAR S DIXIE AND
 ANOTHER ON LAKEVIEW NEAR QUADRILLE AVE.
  
 7A. PER NFPA 14
 6.4.5.4* FIRE DEPARTMENT CONNECTIONS SHALL BE LOCATED
 NOT MORE THAN 100 FT (30.5 M) FROM THE NEAREST FIRE
 HYDRANT CONNECTED TO AN APPROVED WATER SUPPLY.
  
 7B. PLEASE REVIEW THE DISTANCE SEPARATION OF THE
 STAIRWELLS AS THE SEPARATION DISTANCE IS NOT INDICATED.
 7.3.2.2* WHERE THE MOST REMOTE PORTION OF A
 NON-SPRINKLERED FLOOR OR STORY IS LOCATED IN EXCESS OF
 150 FT (45.7 M) OF TRAVEL DISTANCE FROM A HOSE
 CONNECTION IN OR ADJACENT TO A REQUIRED EXIT OR THE
 MOST REMOTE PORTION OF A SPRINKLERED FLOOR OR STORY
 IS LOCATED IN EXCESS OF 200 FT (61 M) OF TRAVEL
 DISTANCE FROM A HOSE CONNECTION IN OR ADJACENT TO A
 REQUIRED EXIT, ADDITIONAL HOSE CONNECTIONS SHALL BE
 PROVIDED, IN APPROVED LOCATIONS, WHERE REQUIRED BY THE
 LOCAL FIRE DEPARTMENT OR THE AHJ.
  
 7C. PER NFPA 1
 18.3 WATER SUPPLIES.
 18.3.1* AN APPROVED WATER SUPPLY CAPABLE OF SUPPLYING
 THE REQUIRED FIRE FLOW FOR FIRE PROTECTION SHALL BE
 PROVIDED TO ALL PREMISES UPON WHICH FACILITIES,
 BUILDINGS, OR PORTIONS OF BUILDINGS ARE HEREAFTER
 CONSTRUCTED OR MOVED INTO THE JURISDICTION. THE
 APPROVED WATER SUPPLY SHALL BE IN ACCORDANCE WITH
 SECTION 18.4.
 PER FLORIDA ADMINISTRATIVE CODE SECTION 61G15-32.004,
 FIRE PROTECTION ENGINEERING DOCUMENTS SHALL INCLUDE THE
 POINT OF SERVICE FOR THE WATER SUPPLY, A LIST OF
 APPLICABLE NFPA STANDARDS APPLICABLE TO THE PROJECT,
 CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR
 AREA, SUPPRESSION SYSTEM TYPE, DESIGN DENSITIES, WATER
 SUPPLY DATA (FIRE PUMP DATA, HYDRANT FLOW TEST DATA)
 AND ANY PERFORMANCE BASED INFORMATION SUCH AS
 PRE-ENGINEERED SYSTEMS.
 FOR THE PROPOSED FIRE PUMP(S) , WHAT IS(ARE) THE
 PRIMARY AND SECONDARY POWER SOURCES?
  
 7D. THE LOCATION OF THE DDCV FIRE LINE LOCATION SHALL
 MEET THE REQUIREMENTS OF NFPA 24 AND SHALL BE
 COORDINATED WITH THE OFFICE OF FIRE MARSHAL, THE CITY'S
 ENGINEERS OFFICE, THE LANDSCAPE PLANNER, AND THE CITY'S
 PLANNING AND ZONING OFFICE.
  
  
 8. A CLASS ?A? NFPA 72 COMPLIANT MONITORED FIRE ALARM
 SYSTEM IS REQUIRED FOR THIS STRUCTURE. SEPARATE SHOP
 DRAWINGS, ARE REQUIRED TO BE SUBMITTED, REVIEWED AND
 APPROVED BY THE FIRE PREVENTION BUREAU PRIOR TO ANY
 INSTALLATION.
  
 9. ALL ELEVATORS SHALL BE EQUIPPED WITH A REGION 7
 KEYWAY SYSTEM.
  
 ALL NEW ELEVATORS SHALL CONFORM TO THE FIRE FIGHTER?S
 EMERGENCY OPERATIONS REQUIREMENTS OF ASME A17.1/CSA
 B44, SAFETY CODE FOR ELEVATORS.
  
 ANY BUILDING THAT IS MORE THAN THREE STORIES HIGH OR IN
 WHICH THE VERTICAL DISTANCE BETWEEN THE BOTTOM TERMINAL
 LANDING AND THE TOP TERMINAL LANDING EXCEEDS 25 FEET
 MUST BE CONSTRUCTED TO CONTAIN AT LEAST ONE PASSENGER
 ELEVATOR THAT IS OPERATIONAL AND WILL ACCOMMODATE AN
 AMBULANCE STRETCHER 76 INCHES LONG AND 24 INCHES WIDE
 IN THE HORIZONTAL POSITION.
  
 10. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL
 BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL
 DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS,
 EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A
 PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE
 SAFETY FEATURES AND EQUIPMENT.
  
 11. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS
 DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED
 ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF
 FIRE PREVENTION.
  
 ALL NEW FIRE HYDRANTS AND FDC?S PLANNED FOR THIS
 DEVELOPMENT SHALL BE CLOSELY COORDINATED WITH THE
 BUREAU OF FIRE PREVENTION. PROPOSED FIRE HYDRANTS AND
 FDC?S SHOULD BE LOCATED ON THE SAME SIDE OF THE STREET
 OR ACCESS ROADWAY TO ALLOW FREE ACCESS FOR OTHER
 ARRIVING EMERGENCY VEHICLES.
  
 12. COMMAND ROOM - THERE WAS NO CLEAR INDICATION OF THE
 LOCATION OF THE EMERGENCY COMMAND CENTER.
  
 THE EMERGENCY COMMAND CENTER SHALL COMPLY WITH NFPA 1,
 CHAPTER 11, BUILDING SERVICES; 11.9 AND SHALL CONTAIN
 THE FOLLOWING FEATURES:
  
 11.9.1 THE LOCATION, DESIGN, CONTENT, AND FIRE
 DEPARTMENT ACCESS OF THE EMERGENCY COMMAND CENTER SHALL
 BE APPROVED BY THE FIRE DEPARTMENT.
  
 IT SHALL BE LOCATED WITH AN EXTERIOR DOOR ACCESS AND IN
 CLOSE RELATION TO THE LOBBY WITH ACCESS.
  
 11.9.2 THE EMERGENCY COMMAND CENTER SHALL BE SEPARATED
 FROM THE REMAINDER OF THE BUILDING BY A FIRE BARRIER
 HAVING A FIRE RESISTANCE RATING OF NOT LESS THAN 1
 HOUR.
  
 11.9.3 THE EMERGENCY COMMAND CENTER ROOM SHALL BE A
 MINIMUM OF 96 FT2 (8.9 M2) WITH A MINIMUM DIMENSION OF
 8 FT (2.4 M).
  
 A.HOWEVER, PER FL BLDG CODE;(MORE STRICT) IT SHALL BE A
 MINIMUM OF 200 FT SQUARED WITH A MINIMUM DIMENSION OF
 10 FT.
 B. THE FIRE DEPARTMENT COMMUNICATIONS SYSTEM.
 C. A TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED
 ACCESS TO THE PUBLIC TELEPHONE SYSTEM
 D. SCHEMATIC BUILDING PLANS INDICATING THE TYPICAL
 FLOOR PLAN AND DETAILING THE BUILDING CORE, MEANS OF
 EGRESS, FIRE PROTECTION SYSTEMS, FIRE-FIGHTING
 EQUIPMENT AND FIRE DEPARTMENT ACCESS AND THE LOCATION
 OF FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE
 BARRIERS AND SMOKE PARTITIONS
 E. A WORK TABLE.
 F. IF APPLICABLE, A HAZARDOUS MATERIAL MANAGEMENT PLAN
 FOR THE BUILDING.
 G. THE EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM
 CONTROL UNIT.
 H. ANNUNCIATOR UNIT VISUALLY INDICATING THE LOCATION OF
 THE ELEVATORS AND WHETHER THEY ARE OPERATIONAL
 I. STATUS INDICATORS AND CONTROLS FOR AIR DISTRIBUTION
 SYSTEMS.
 J. CONTROLS FOR UNLOCKING STAIRWAY DOORS SIMULTANEOUSLY
 K. SPRINKLER VALVE AND WATER FLOW DETECTOR DISPLAY
 PANELS
 L. EMERGENCY AND STANDBY POWER STATUS INDICATORS
 M. FIRE PUMP STATUS INDICATORS
 N. GENERATOR SUPERVISION DEVICES AND MANUAL START AND
 TRANSFER FEATURES.
 O. PUBLIC ADDRESS SYSTEM, WHERE SPECIFICALLY REQUIRED
 BY OTHER SECTIONS OF THIS CODE
 P. CONTROLS REQUIRED FOR SMOKE CONTROL
 Q. ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME
 A17.1.
 R. ELEVATOR EMERGENCY OR STANDBY POWER SELECTOR
 SWITCH(ES), WHERE EMERGENCY OR STANDBY POWER IS
 PROVIDED
  
 PER NFPA 101, CH 11
  
 11.8.6* EMERGENCY COMMAND CENTER.
  
 11.8.6.1 AN EMERGENCY COMMAND CENTER SHALL BE PROVIDED
 IN A
 LOCATION APPROVED BY THE FIRE DEPARTMENT.
 11.8.6.2 THE EMERGENCY COMMAND CENTER SHALL CONTAIN THE
 FOLLOWING:
 (1) VOICE FIRE ALARM SYSTEM PANELS AND CONTROLS
 (2) FIRE DEPARTMENT TWO-WAY TELEPHONE COMMUNICATION
 SERVICE
 PANELS AND CONTROLS WHERE REQUIRED BY ANOTHER SECTION
 OF THIS
 CODE
 (3) FIRE DETECTION AND FIRE ALARM SYSTEM ANNUNCIATION
 PANELS
 (4) ELEVATOR FLOOR LOCATION AND OPERATION ANNUNCIATORS
 (5) ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME
 A17.1/CSA B44, SAFETY CODE FOR ELEVATORS AND ESCALATORS
 (6) ELEVATOR EMERGENCY POWER SELECTOR SWITCH(ES) WHERE
 PROVIDED
 IN ACCORDANCE WITH ASME A17.1/CSA B44
 (7) SPRINKLER VALVE AND WATERFLOW ANNUNCIATORS
 (8) EMERGENCY GENERATOR STATUS INDICATORS
 (9) CONTROLS FOR ANY AUTOMATIC STAIRWAY DOOR UNLOCKING
 SYSTEM
 (10) FIRE PUMP STATUS INDICATORS
 (11) TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED
 ACCESS TO THE
 PUBLIC TELEPHONE SYSTEM
 (12) STAIRWAY VIDEO MONITORING EQUIPMENT AS REQUIRED BY
 11.8.8
  
 13. RADIO
  
 NFPA 1, CHAPTER 11, BUILDING SERVICES; 11.10 TWO-WAY
 RADIO ENHANCEMENT SERVICES.
 11.10.1 IN ALL NEW AND EXISTING BUILDINGS, MINIMUM
 RADIO SIGNAL STRENGTH FOR FIRE DEPARTMENT
 COMMUNICATIONS SHALL BE MAINTAINED AT A LEVEL
 DETERMINED BY THE AHJ.
  
 NFPA 72, 24.5.2* TWO-WAY RADIO COMMUNICATIONS
 ENHANCEMENT SYSTEMS.
 24.5.2.2 RADIO COVERAGE. RADIO COVERAGE SHALL BE
 PROVIDED THROUGHOUT THE BUILDING AS A PERCENTAGE OF
 FLOOR AREA AS SPECIFIED IN 24.5.2.2.1 THROUGH
 24.5.2.2.3.
 24.5.2.2.1 CRITICAL AREAS. CRITICAL AREAS, SUCH AS THE
 EMERGENCY COMMAND CENTER(S), THE FIRE PUMP ROOM(S),
 EXIT STAIRS, EXIT PASSAGEWAYS, ELEVATOR LOBBIES,
 STANDPIPE CABINETS, SPRINKLER SECTIONAL VALVE
 LOCATIONS, AND OTHER AREAS DEEMED CRITICAL BY THE
 AUTHORITY HAVING JURISDICTION, SHALL BE PROVIDED WITH
 99 PERCENT FLOOR AREA RADIO COVERAGE.
 24.5.2.2.2 GENERAL BUILDING AREAS. GENERAL BUILDING
 AREAS SHALL BE PROVIDED WITH 90 PERCENT FLOOR AREA
 RADIO COVERAGE.
 24.5.2.3 SIGNAL STRENGTH.
 24.5.2.3.1 INBOUND. A MINIMUM INBOUND SIGNAL STRENGTH
 OF -95 DBM, OR OTHER SIGNAL STRENGTH AS REQUIRED BY THE
 AUTHORITY HAVING JURISDICTION, SHALL BE PROVIDED
 THROUGHOUT THE COVERAGE AREA.
 24.5.2.3.2 OUTBOUND. A MINIMUM OUTBOUND SIGNAL STRENGTH
 OF -95 DBM AT THE DONOR SITE, OR OTHER SIGNAL STRENGTH
 AS REQUIRED BY THE AUTHORITY HAVING JURISDICTION, SHALL
 BE PROVIDED FROM THE COVERAGE AREA.
  
 THE SYSTEM SHALL MAINTAIN A MINIMUM RADIO SIGNAL
 STRENGTH OF -95 DBM FOR THE RADIO SYSTEM USED BY WEST
 PALM BEACH FIRE RESCUE. TESTING SHALL BE BY AN
 ACCEPTABLE NATIONAL STANDARD DOCUMENTING PERCENTAGES
 NOTED ABOVE AND BY ACTUAL RADIO TESTING BY FIRE
 PERSONNEL. IF THE MINIMUM CANNOT BE MAINTAINED, A
 BI-DIRECTIONAL AMPLIFIED SYSTEM SHALL BE INSTALLED WITH
 A MINIMUM 2-HOUR RUN TIME BATTERY BACK-UP.
 PLEASE CONTACT MARK FILLA, PALM BEACH COUNTY PUBLIC
 SAFETY RADIO SYSTEMS MANAGER, AS OUR RADIOS OPERATE ON
 THEIR SYSTEM FOR DETAILED RADIO FREQUENCY AND
 INSTALLATION INSTRUCTIONS.
  
  
 14. KNOX-BOX KEY SYSTEM SHALL BE REQUIRED FOR THIS
 BUILDING. DUE TO SIZE AND ACCESS POINTS MULTIPLE KNOX
 BOXES MAY BE REQUIRED.
  
 PLEASE COORDINATE WITH THE OFFICE OF THE FIRE MARSHAL.
  
 ANY GATES SHALL BE PROVIDED WITH KNOX KEY ACCESS LOCKS,
 PADLOCKS AND/OR SWITCHES FOR 24 HOUR EMERGENCY ACCESS.
  
 15. THE SMOKE CONTROL SYSTEM SHALL COMPLY WITH NFPA
 101, CHAPTER 9, BUILDING SERVICE AND FIRE PROTECTION
 EQUIPMENT, INCLUDING:
  
 THE SMOKE CONTROL SYSTEMS SHALL BE INSTALLED,
 INSPECTED, TESTED, AND MAINTAINED IN ACCORDANCE WITH
 NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS; NFPA 204,
 STANDARD FOR SMOKE AND HEAT VENTING; OR NATIONALLY
 RECOGNIZED STANDARDS, ENGINEERING GUIDES, OR
 RECOMMENDED PRACTICES, AS APPROVED BY THE AUTHORITY
 HAVING JURISDICTION.
  
 THE ENGINEER OF RECORD SHALL CLEARLY IDENTIFY THE
 INTENT OF THE SYSTEM, THE DESIGN METHOD USED, THE
 APPROPRIATENESS OF THE METHOD USED, AND THE REQUIRED
 MEANS OF INSPECTING, TESTING, AND MAINTAINING THE
 SYSTEM.
 ACCEPTANCE TESTING SHALL BE PERFORMED BY A SPECIAL
 INSPECTOR IN ACCORDANCE WITH SECTION 9.9.
  
 16. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT
 DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL.
  
 17. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING
 PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH
 THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop L LANDSCAPING
Rev No 6 Status P Date 02-28-2023 Cont ID  
Sent By rcaranci Date 02-28-2023 Time 14:06 Rev Time 0.00
Received By rcaranci Date 02-28-2023 Time 14:06 Sent To  
Notes
2023-02-28 14:07:36FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: WEST PALM POINT Z20120016
 FEBRUARY 28, 2023
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS FOR THE FINAL SITE PLAN
 APPROVAL:
  
  
 1. SATISFIED. LIST THE TREE SPECIES AND SQUARE FOOTAGE
 CREDIT FOR THE OPEN SPACE SQUARE FOOTAGE CALCULATIONS
 FOR EACH OPEN SPACE. PERCENTAGES DO NOT MEET THE
 REQUIREMENTS FOR THE ENTIRE PRIVATE OPEN SPACE SO AN
 AREA MEETING THE REQUIREMENTS NEEDS TO BE DESIGNATED.
 OS-1 OPEN SPACE PLAN DOES NOT MATCH THE LANDSCAPE PLAN
 SHEET LP-1 FOR THE NUMBER OF CLUSIA TREES AT THE
 NORTHEAST CORNER OF THE PLAZA.
 NEEDS TO BE BASED ON PROVIDED. DESIGNATE AN AREA THAT
 MEETS THE MINIMUM OPEN SPACE AREA REQUIRED AND THEN
 PROVIDE PERCENTAGES OF VEGETATED AREA AND TREE CANOPY
 FOR THAT AREA. 17,895 SQ FT REQUIRES 4,473.75 SQ FT
 VEGETATED AREA AND 5,368.5 SQ FT TREE CANOPY, WHICH ARE
 NOT MET.
 THE PUBLIC OPEN SPACE PLAZA NEEDS TO MEET THE CRITERIA
 ABOVE. THE PRIVATE OPEN SPACE ROOFTOP GARDEN HAS SOME
 TREE CANOPY SQUARE FOOTAGE CALCULATIONS THAT ARE OFF
 AND LIGUSTRUMS ARE NOT COUNTED.
 10/31/22: THE AREA DESIGNATED AS PUBLIC OPEN SPACE HAS
 CHANGED FROM THE APPROVAL. MAKE THE FOLLOWING
 CORRECTIONS TO THE PLAN:
 ??? THE AREA CANNOT HAVE THE SMALL PIECE SPLIT OFF FOR
 THE PASEO, AS IT WOULD HAVE TO MEET THE OPEN SPACE
 REQUIREMENTS ON ITS OWN IF SEPARATED. IF CHANGING THE
 DESIGNATED AREA, SHOW ALL THE REQUIREMENTS ARE MET FOR
 THE NEW AREA.
 ??? ADDITIONAL TREES PROVIDED FOR THE CONDITION FOR THE
 5 SHADE TREES TO BE PROVIDED ON THE SITE ARE NOT TO BE
 COUNTED TOWARD OPEN SPACE CANOPY REQUIREMENTS.
 2. SATISFIED. THE WEST STREETSCAPE DOES NOT MEET THE
 REQUIREMENTS FOR PLACEMENT OR NUMBER OF THE REQUIRED
 STREET TREES ALONG THE CURB. THE MEDIAN PLACEMENT OF
 TREES DO NOT MEET THE INTENT OF PROVIDING TREE CANOPY
 OVER THE PEDESTRIAN AREAS OF THE STREETSCAPE.
 THE RESPONSE TO COMMENT DID NOT INCLUDE THE WAIVER
 REQUEST FOR THE WEST STREETSCAPE SEGMENT AS INDICATED
 ON SHEET LP-1. 4 TREES ARE PROVIDED IN THE STREETSCAPE,
 STAFF DISCUSSED AND REQUESTS ADDING ONE ADDITIONAL TREE
 ON EACH SIDE OF THE DROPOFF CANOPY TO PROVIDE
 ADDITIONAL SHADE FOR THE SIDEWALK AREA AND ADDING THE
 REMAINING 3 TREES TO THE PLAZA PUBLIC OPEN SPACE TO
 PROVIDE ADDITIONAL PEDESTRIAN SHADE. THIS MEETS THE
 INTENT OF THE STREETSCAPE REQUIREMENTS.
 TREES ADDED IN QUADRILLE MEDIAN DO NOT CONTRIBUTE TO
 SHADE FOR PEDESTRIANS BUT WILL IMPROVE THE AESTHETICS.
 STAFF SUGGESTS THE USE OF BULNESIA ARBOREA TO FOLLOW
 THE PATTERN ON QUADRILLE AND ALABAMA AVENUE ADJACENT TO
 RESTORATION HARDWARE SITE.
 10/31/22: THE 5 ADDITIONAL SHADE TREES NEED TO BE
 PROVIDED ON SITE AND IDENTIFIED ON THE LANDSCAPE PLAN.
  
 3. SATISFIED. PROVIDE PRELIMINARY FDOT APPROVAL FOR ALL
 TREES IN THE FDOT RIGHT OF WAY.
 THE STREET TREES EAST OF THE GARAGE ENTRANCE ON
 LAKEVIEW AND THE STREET TREES WEST OF THE GARAGE
 ENTRANCE ON OKEECHOBEE APPEAR TO BE IN FDOT SIGHT LINES
 PER THE ENGINEERING PLANS. THESE TREES NEED TO BE MOVED
 OUT OF THE SIGHT LINES CLOSER TO THE BUILDING. THERE
 MAY BE DRAINAGE LINES ON THE OKEECHOBEE SIDE THAT WILL
 ALSO HAVE TO BE MOVED TO ACCOMMODATE THE TREES.
 10/31/22 INDICATE IF THE STREETSCAPE PLAN SUBMITTED
 WILL MEET FDOT PERMITTING REQUIREMENTS.
  
  
 CONDITIONS OF APPROVAL
  
 1. EXFILTRATION AND DRAINAGE SYSTEM LOCATIONS WILL BE
 DESIGNED TO AVOID CONFLICTS WITH THE STREET TREES AND
 PLAZA TREES AS SHOWN IN THE APPROVED VERSION OF THE
 LANDSCAPE PLAN.
 2. STREET TREES AND LANDSCAPING WILL REQUIRE A FDOT
 PERMIT.
  
 THESE CONDITIONS ARE IN ADDITION TO THE PREVIOUS
 CONDITIONS.
  

Review Stop L LANDSCAPING
Rev No 5 Status F Date 10-31-2022 Cont ID  
Sent By rcaranci Date 10-31-2022 Time 12:48 Rev Time 0.00
Received By rcaranci Date 10-31-2022 Time 12:48 Sent To  
Notes
2022-10-31 12:51:46FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: WEST PALM POINT Z20120016
 OCTOBER 31, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS FOR THE FINAL SITE PLAN
 APPROVAL:
  
  
 1. CONDITIONALLY SATISFIED. LIST THE TREE SPECIES AND
 SQUARE FOOTAGE CREDIT FOR THE OPEN SPACE SQUARE FOOTAGE
 CALCULATIONS FOR EACH OPEN SPACE. PERCENTAGES DO NOT
 MEET THE REQUIREMENTS FOR THE ENTIRE PRIVATE OPEN SPACE
 SO AN AREA MEETING THE REQUIREMENTS NEEDS TO BE
 DESIGNATED.
 OS-1 OPEN SPACE PLAN DOES NOT MATCH THE LANDSCAPE PLAN
 SHEET LP-1 FOR THE NUMBER OF CLUSIA TREES AT THE
 NORTHEAST CORNER OF THE PLAZA.
 NEEDS TO BE BASED ON PROVIDED. DESIGNATE AN AREA THAT
 MEETS THE MINIMUM OPEN SPACE AREA REQUIRED AND THEN
 PROVIDE PERCENTAGES OF VEGETATED AREA AND TREE CANOPY
 FOR THAT AREA. 17,895 SQ FT REQUIRES 4,473.75 SQ FT
 VEGETATED AREA AND 5,368.5 SQ FT TREE CANOPY, WHICH ARE
 NOT MET.
 THE PUBLIC OPEN SPACE PLAZA NEEDS TO MEET THE CRITERIA
 ABOVE. THE PRIVATE OPEN SPACE ROOFTOP GARDEN HAS SOME
 TREE CANOPY SQUARE FOOTAGE CALCULATIONS THAT ARE OFF
 AND LIGUSTRUMS ARE NOT COUNTED.
 10/31/22: THE AREA DESIGNATED AS PUBLIC OPEN SPACE HAS
 CHANGED FROM THE APPROVAL. MAKE THE FOLLOWING
 CORRECTIONS TO THE PLAN:
 ??? THE AREA CANNOT HAVE THE SMALL PIECE SPLIT OFF FOR
 THE PASEO, AS IT WOULD HAVE TO MEET THE OPEN SPACE
 REQUIREMENTS ON ITS OWN IF SEPARATED. IF CHANGING THE
 DESIGNATED AREA, SHOW ALL THE REQUIREMENTS ARE MET FOR
 THE NEW AREA.
 ??? ADDITIONAL TREES PROVIDED FOR THE CONDITION FOR THE
 5 SHADE TREES TO BE PROVIDED ON THE SITE ARE NOT TO BE
 COUNTED TOWARD OPEN SPACE CANOPY REQUIREMENTS.
 2. CONDITIONALLY SATISFIED. THE WEST STREETSCAPE DOES
 NOT MEET THE REQUIREMENTS FOR PLACEMENT OR NUMBER OF
 THE REQUIRED STREET TREES ALONG THE CURB. THE MEDIAN
 PLACEMENT OF TREES DO NOT MEET THE INTENT OF PROVIDING
 TREE CANOPY OVER THE PEDESTRIAN AREAS OF THE
 STREETSCAPE.
 THE RESPONSE TO COMMENT DID NOT INCLUDE THE WAIVER
 REQUEST FOR THE WEST STREETSCAPE SEGMENT AS INDICATED
 ON SHEET LP-1. 4 TREES ARE PROVIDED IN THE STREETSCAPE,
 STAFF DISCUSSED AND REQUESTS ADDING ONE ADDITIONAL TREE
 ON EACH SIDE OF THE DROPOFF CANOPY TO PROVIDE
 ADDITIONAL SHADE FOR THE SIDEWALK AREA AND ADDING THE
 REMAINING 3 TREES TO THE PLAZA PUBLIC OPEN SPACE TO
 PROVIDE ADDITIONAL PEDESTRIAN SHADE. THIS MEETS THE
 INTENT OF THE STREETSCAPE REQUIREMENTS.
 TREES ADDED IN QUADRILLE MEDIAN DO NOT CONTRIBUTE TO
 SHADE FOR PEDESTRIANS BUT WILL IMPROVE THE AESTHETICS.
 STAFF SUGGESTS THE USE OF BULNESIA ARBOREA TO FOLLOW
 THE PATTERN ON QUADRILLE AND ALABAMA AVENUE ADJACENT TO
 RESTORATION HARDWARE SITE.
 10/31/22: THE 5 ADDITIONAL SHADE TREES NEED TO BE
 PROVIDED ON SITE AND IDENTIFIED ON THE LANDSCAPE PLAN.
  
 3. CONDITIONALLY SATISFIED. PROVIDE PRELIMINARY FDOT
 APPROVAL FOR ALL TREES IN THE FDOT RIGHT OF WAY.
 THE STREET TREES EAST OF THE GARAGE ENTRANCE ON
 LAKEVIEW AND THE STREET TREES WEST OF THE GARAGE
 ENTRANCE ON OKEECHOBEE APPEAR TO BE IN FDOT SIGHT LINES
 PER THE ENGINEERING PLANS. THESE TREES NEED TO BE MOVED
 OUT OF THE SIGHT LINES CLOSER TO THE BUILDING. THERE
 MAY BE DRAINAGE LINES ON THE OKEECHOBEE SIDE THAT WILL
 ALSO HAVE TO BE MOVED TO ACCOMMODATE THE TREES.
 10/31/22 INDICATE IF THE STREETSCAPE PLAN SUBMITTED
 WILL MEET FDOT PERMITTING REQUIREMENTS.
  
  

Review Stop L LANDSCAPING
Rev No 4 Status P Date 01-10-2022 Cont ID  
Sent By rcaranci Date 01-10-2022 Time 11:18 Rev Time 0.00
Received By rcaranci Date 01-10-2022 Time 11:18 Sent To  
Notes
2022-01-10 11:19:02FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: WEST PALM POINT Z20120016
 JANUARY 10, 2022
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. MAKE THE FOLLOWING CORRECTIONS TO THE TREE
 DISPOSITION PLAN AND THE TREE INVENTORY LIST:
 ? CONDITIONALLY SATISFIED. EXPLAIN WHERE THE RELOCATED
 ROYAL PALMS WILL BE PLANTED
 ? SATISFIED. #12 FICUS WOULD BE 300 SQ FT MITIGATION
 ? SATISFIED. #13 WASHINGTONIA PALM IS CATEGORY 4, SO 50
 SQ FT MITIGATION
 ? SATISFIED. CORRECT SPELLING FOR MITIGATION REQ (SF)
 COLUMN
  
 2. CONDITIONALLY SATISFIED. LIST THE TREE SPECIES AND
 SQUARE FOOTAGE CREDIT FOR THE OPEN SPACE SQUARE FOOTAGE
 CALCULATIONS FOR EACH OPEN SPACE. PERCENTAGES DO NOT
 MEET THE REQUIREMENTS FOR THE ENTIRE PRIVATE OPEN SPACE
 SO AN AREA MEETING THE REQUIREMENTS NEEDS TO BE
 DESIGNATED.
 OS-1 OPEN SPACE PLAN DOES NOT MATCH THE LANDSCAPE PLAN
 SHEET LP-1 FOR THE NUMBER OF CLUSIA TREES AT THE
 NORTHEAST CORNER OF THE PLAZA.
 NEEDS TO BE BASED ON PROVIDED. DESIGNATE AN AREA THAT
 MEETS THE MINIMUM OPEN SPACE AREA REQUIRED AND THEN
 PROVIDE PERCENTAGES OF VEGETATED AREA AND TREE CANOPY
 FOR THAT AREA. 17,895 SQ FT REQUIRES 4,473.75 SQ FT
 VEGETATED AREA AND 5,368.5 SQ FT TREE CANOPY, WHICH ARE
 NOT MET.
 THE PUBLIC OPEN SPACE PLAZA NEEDS TO MEET THE CRITERIA
 ABOVE. THE PRIVATE OPEN SPACE ROOFTOP GARDEN HAS SOME
 TREE CANOPY SQUARE FOOTAGE CALCULATIONS THAT ARE OFF
 AND LIGUSTRUMS ARE NOT COUNTED.
  
 3. SATISFIED. PER SECTION 94-113, CALCULATIONS FOR
 NUMBER OF REQUIRED STREET TREES NEED TO BE CORRECTED.
 LIST TOTAL LENGTH OF EACH PROPERTY LINE SEGMENT, DIVIDE
 BY 30, THEN INDICATE THE NUMBER OF TREES REQUIRED,
 ROUNDING UP FOR ANY PORTION LEFT. ACCESSWAYS ARE NOT
 DEDUCTED.
  
 4. CONDITIONALLY SATISFIED. THE WEST STREETSCAPE DOES
 NOT MEET THE REQUIREMENTS FOR PLACEMENT OR NUMBER OF
 THE REQUIRED STREET TREES ALONG THE CURB. THE MEDIAN
 PLACEMENT OF TREES DO NOT MEET THE INTENT OF PROVIDING
 TREE CANOPY OVER THE PEDESTRIAN AREAS OF THE
 STREETSCAPE.
 THE RESPONSE TO COMMENT DID NOT INCLUDE THE WAIVER
 REQUEST FOR THE WEST STREETSCAPE SEGMENT AS INDICATED
 ON SHEET LP-1. 4 TREES ARE PROVIDED IN THE STREETSCAPE,
 STAFF DISCUSSED AND REQUESTS ADDING ONE ADDITIONAL TREE
 ON EACH SIDE OF THE DROPOFF CANOPY TO PROVIDE
 ADDITIONAL SHADE FOR THE SIDEWALK AREA AND ADDING THE
 REMAINING 3 TREES TO THE PLAZA PUBLIC OPEN SPACE TO
 PROVIDE ADDITIONAL PEDESTRIAN SHADE. THIS MEETS THE
 INTENT OF THE STREETSCAPE REQUIREMENTS.
 TREES ADDED IN QUADRILLE MEDIAN DO NOT CONTRIBUTE TO
 SHADE FOR PEDESTRIANS BUT WILL IMPROVE THE AESTHETICS.
 STAFF SUGGESTS THE USE OF BULNESIA ARBOREA TO FOLLOW
 THE PATTERN ON QUADRILLE AND ALABAMA AVENUE ADJACENT TO
 RESTORATION HARDWARE SITE.
  
  
 5. SATISFIED. FLORIDA FRIENDLY DESIGN OPTIONS POINTS
 CANNOT BE COUNTED FOR 51% OR MORE NATIVE GROUNDCOVER,
 AS THEY ARE ALL NON-NATIVE. POINTS CANNOT BE COUNTED
 FOR 51% OR MORE NATIVE SHRUBS, AS THEY ARE ALL
 NON-NATIVE.
  
 6. SATISFIED. CORRECT IN THE PLANT LIST: NATCHEZ CRAPE
 MYRTLE IS NOT FLORIDA NATIVE. AGAVE AMERICANA IS NOT
 FLORIDA NATIVE.
  
 7. SATISFIED. SHOW LOCATIONS OF UTILITY LINES ON
 LANDSCAPE PLAN, ALSO LOCATIONS OF VALVES AND BACKFLOW
 PREVENTERS AND FPL TRANSFORMERS. SCREENING MUST BE
 PROVIDED. THERE ARE CONFLICTS BETWEEN UTILITIES AND
 LANDSCAPING THAT WILL HAVE TO BE RESOLVED.
  
 8. SATISFIED. PER SECTION 94-113, ADJUST LOCATIONS OF
 REQUIRED STRUCTURAL SOIL TO ONLY SHOW UNDER HARDSCAPE
 ADJACENT TO STREET TREES. AREA FOR STRUCTURAL SOIL AND
 PLANTING AREA SHOULD BE APPROXIMATELY 14 FEET IN LENGTH
 AND 9 FEET IN WIDTH RELATIVE TO THE BACK OF CURB.
 STRUCTURAL SOIL DETAIL IS TO SHOW THE CONSTRUCTION
 CROSS SECTION FOR DEPTH OF 36 INCHES, AND PLANTING SOIL
 IN THE PLANTING AREA. DO NOT INCLUDE TREE GRATES UNLESS
 NEEDED FOR ADA TRAVEL WIDTH. CORRECT THE DETAIL TO
 REFLECT THIS.
  
 ADDITIONAL COMMENTS 5/4/21:
  
 9. SATISFIED. CORRECT THE TREES PROVIDED FOR MITIGATION
 PROVIDED ON THE TREE DISPOSITION SHEET TD-1 TO MATCH
 THE PLANT LIST. CATHEDRAL OAK, NOT HIGHRISE OAK.
 10. CONDITIONALLY SATISFIED. PROVIDE PRELIMINARY FDOT
 APPROVAL FOR ALL TREES IN THE FDOT RIGHT OF WAY.
 THE STREET TREES EAST OF THE GARAGE ENTRANCE ON
 LAKEVIEW AND THE STREET TREES WEST OF THE GARAGE
 ENTRANCE ON OKEECHOBEE APPEAR TO BE IN FDOT SIGHT LINES
 PER THE ENGINEERING PLANS. THESE TREES NEED TO BE MOVED
 OUT OF THE SIGHT LINES CLOSER TO THE BUILDING. THERE
 MAY BE DRAINAGE LINES ON THE OKEECHOBEE SIDE THAT WILL
 ALSO HAVE TO BE MOVED TO ACCOMMODATE THE TREES.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION. LOCATIONS OF
 ROYAL PALMS TO BE TRANSPLANTED WILL BE DETERMINED AT
 TIME OF PERMIT.
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF
 WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A
 SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  

Review Stop L LANDSCAPING
Rev No 3 Status F Date 12-21-2021 Cont ID  
Sent By rcaranci Date 12-21-2021 Time 13:23 Rev Time 0.00
Received By rcaranci Date 12-20-2021 Time 16:11 Sent To  
Notes
2021-12-21 13:23:58FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: WEST PALM POINT Z20120016
 DECEMBER 21, 2021
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. MAKE THE FOLLOWING CORRECTIONS TO THE TREE
 DISPOSITION PLAN AND THE TREE INVENTORY LIST:
 ? CONDITIONALLY SATISFIED. EXPLAIN WHERE THE RELOCATED
 ROYAL PALMS WILL BE PLANTED
 ? SATISFIED. #12 FICUS WOULD BE 300 SQ FT MITIGATION
 ? SATISFIED. #13 WASHINGTONIA PALM IS CATEGORY 4, SO 50
 SQ FT MITIGATION
 ? SATISFIED. CORRECT SPELLING FOR MITIGATION REQ (SF)
 COLUMN
  
 2. PARTIALLY SATISFIED. LIST THE TREE SPECIES AND
 SQUARE FOOTAGE CREDIT FOR THE OPEN SPACE SQUARE FOOTAGE
 CALCULATIONS FOR EACH OPEN SPACE. PERCENTAGES DO NOT
 MEET THE REQUIREMENTS FOR THE ENTIRE PRIVATE OPEN SPACE
 SO AN AREA MEETING THE REQUIREMENTS NEEDS TO BE
 DESIGNATED.
 OS-1 OPEN SPACE PLAN DOES NOT MATCH THE LANDSCAPE PLAN
 SHEET LP-1 FOR THE NUMBER OF CLUSIA TREES AT THE
 NORTHEAST CORNER OF THE PLAZA.
 NEEDS TO BE BASED ON PROVIDED. DESIGNATE AN AREA THAT
 MEETS THE MINIMUM OPEN SPACE AREA REQUIRED AND THEN
 PROVIDE PERCENTAGES OF VEGETATED AREA AND TREE CANOPY
 FOR THAT AREA. 17,895 SQ FT REQUIRES 4,473.75 SQ FT
 VEGETATED AREA AND 5,368.5 SQ FT TREE CANOPY, WHICH ARE
 NOT MET.
 THE PUBLIC OPEN SPACE PLAZA NEEDS TO MEET THE CRITERIA
 ABOVE. THE PRIVATE OPEN SPACE ROOFTOP GARDEN HAS SOME
 TREE CANOPY SQUARE FOOTAGE CALCULATIONS THAT ARE OFF
 AND LIGUSTRUMS ARE NOT COUNTED.
  
 3. SATISFIED. PER SECTION 94-113, CALCULATIONS FOR
 NUMBER OF REQUIRED STREET TREES NEED TO BE CORRECTED.
 LIST TOTAL LENGTH OF EACH PROPERTY LINE SEGMENT, DIVIDE
 BY 30, THEN INDICATE THE NUMBER OF TREES REQUIRED,
 ROUNDING UP FOR ANY PORTION LEFT. ACCESSWAYS ARE NOT
 DEDUCTED.
  
 4. PARTIALLY SATISFIED. THE WEST STREETSCAPE DOES NOT
 MEET THE REQUIREMENTS FOR PLACEMENT OR NUMBER OF THE
 REQUIRED STREET TREES ALONG THE CURB. THE MEDIAN
 PLACEMENT OF TREES DO NOT MEET THE INTENT OF PROVIDING
 TREE CANOPY OVER THE PEDESTRIAN AREAS OF THE
 STREETSCAPE.
 THE RESPONSE TO COMMENT DID NOT INCLUDE THE WAIVER
 REQUEST FOR THE WEST STREETSCAPE SEGMENT AS INDICATED
 ON SHEET LP-1. 4 TREES ARE PROVIDED IN THE STREETSCAPE,
 STAFF DISCUSSED AND REQUESTS ADDING ONE ADDITIONAL TREE
 ON EACH SIDE OF THE DROPOFF CANOPY TO PROVIDE
 ADDITIONAL SHADE FOR THE SIDEWALK AREA AND ADDING THE
 REMAINING 3 TREES TO THE PLAZA PUBLIC OPEN SPACE TO
 PROVIDE ADDITIONAL PEDESTRIAN SHADE. THIS MEETS THE
 INTENT OF THE STREETSCAPE REQUIREMENTS.
 TREES ADDED IN QUADRILLE MEDIAN DO NOT CONTRIBUTE TO
 SHADE FOR PEDESTRIANS BUT WILL IMPROVE THE AESTHETICS.
 STAFF SUGGESTS THE USE OF BULNESIA ARBOREA TO FOLLOW
 THE PATTERN ON QUADRILLE AND ALABAMA AVENUE ADJACENT TO
 RESTORATION HARDWARE SITE.
  
  
 5. SATISFIED. FLORIDA FRIENDLY DESIGN OPTIONS POINTS
 CANNOT BE COUNTED FOR 51% OR MORE NATIVE GROUNDCOVER,
 AS THEY ARE ALL NON-NATIVE. POINTS CANNOT BE COUNTED
 FOR 51% OR MORE NATIVE SHRUBS, AS THEY ARE ALL
 NON-NATIVE.
  
 6. SATISFIED. CORRECT IN THE PLANT LIST: NATCHEZ CRAPE
 MYRTLE IS NOT FLORIDA NATIVE. AGAVE AMERICANA IS NOT
 FLORIDA NATIVE.
  
 7. SATISFIED. SHOW LOCATIONS OF UTILITY LINES ON
 LANDSCAPE PLAN, ALSO LOCATIONS OF VALVES AND BACKFLOW
 PREVENTERS AND FPL TRANSFORMERS. SCREENING MUST BE
 PROVIDED. THERE ARE CONFLICTS BETWEEN UTILITIES AND
 LANDSCAPING THAT WILL HAVE TO BE RESOLVED.
  
 8. SATISFIED. PER SECTION 94-113, ADJUST LOCATIONS OF
 REQUIRED STRUCTURAL SOIL TO ONLY SHOW UNDER HARDSCAPE
 ADJACENT TO STREET TREES. AREA FOR STRUCTURAL SOIL AND
 PLANTING AREA SHOULD BE APPROXIMATELY 14 FEET IN LENGTH
 AND 9 FEET IN WIDTH RELATIVE TO THE BACK OF CURB.
 STRUCTURAL SOIL DETAIL IS TO SHOW THE CONSTRUCTION
 CROSS SECTION FOR DEPTH OF 36 INCHES, AND PLANTING SOIL
 IN THE PLANTING AREA. DO NOT INCLUDE TREE GRATES UNLESS
 NEEDED FOR ADA TRAVEL WIDTH. CORRECT THE DETAIL TO
 REFLECT THIS.
  
 ADDITIONAL COMMENTS 5/4/21:
  
 9. SATISFIED. CORRECT THE TREES PROVIDED FOR MITIGATION
 PROVIDED ON THE TREE DISPOSITION SHEET TD-1 TO MATCH
 THE PLANT LIST. CATHEDRAL OAK, NOT HIGHRISE OAK.
 10. PARTIALLY SATISFIED. PROVIDE PRELIMINARY FDOT
 APPROVAL FOR ALL TREES IN THE FDOT RIGHT OF WAY.
 THE STREET TREES EAST OF THE GARAGE ENTRANCE ON
 LAKEVIEW AND THE STREET TREES WEST OF THE GARAGE
 ENTRANCE ON OKEECHOBEE APPEAR TO BE IN FDOT SIGHT LINES
 PER THE ENGINEERING PLANS. THESE TREES NEED TO BE MOVED
 OUT OF THE SIGHT LINES CLOSER TO THE BUILDING. THERE
 MAY BE DRAINAGE LINES ON THE OKEECHOBEE SIDE THAT WILL
 ALSO HAVE TO BE MOVED TO ACCOMMODATE THE TREES.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION. LOCATIONS OF
 ROYAL PALMS TO BE TRANSPLANTED WILL BE DETERMINED AT
 TIME OF PERMIT.
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF
 WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A
 SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
 4. LOCATIONS OF ROOT BARRIERS SHALL NOT BLOCK TREE
 ROOTS FROM STRUCTURAL SOIL AREAS OR THERE IS NO POINT
 IN PROVIDING THE STRUCTURAL SOIL.
  

Review Stop L LANDSCAPING
Rev No 2 Status F Date 05-05-2021 Cont ID  
Sent By rcaranci Date 05-05-2021 Time 12:20 Rev Time 0.00
Received By rcaranci Date 05-05-2021 Time 12:20 Sent To  
Notes
2021-05-05 12:21:52FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: WEST PALM POINT Z20120016
 MAY 5, 2021
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. MAKE THE FOLLOWING CORRECTIONS TO THE TREE
 DISPOSITION PLAN AND THE TREE INVENTORY LIST:
 ? CONDITIONALLY SATISFIED. EXPLAIN WHERE THE RELOCATED
 ROYAL PALMS WILL BE PLANTED
 ? SATISFIED. #12 FICUS WOULD BE 300 SQ FT MITIGATION
 ? SATISFIED. #13 WASHINGTONIA PALM IS CATEGORY 4, SO 50
 SQ FT MITIGATION
 ? SATISFIED. CORRECT SPELLING FOR MITIGATION REQ (SF)
 COLUMN
  
 2. PARTIALLY SATISFIED. LIST THE TREE SPECIES AND
 SQUARE FOOTAGE CREDIT FOR THE OPEN SPACE SQUARE FOOTAGE
 CALCULATIONS FOR EACH OPEN SPACE. PERCENTAGES DO NOT
 MEET THE REQUIREMENTS FOR THE ENTIRE PRIVATE OPEN SPACE
 SO AN AREA MEETING THE REQUIREMENTS NEEDS TO BE
 DESIGNATED.
 OS-1 OPEN SPACE PLAN DOES NOT MATCH THE LANDSCAPE PLAN
 SHEET LP-1 FOR THE NUMBER OF CLUSIA TREES AT THE
 NORTHEAST CORNER OF THE PLAZA.
  
 3. SATISFIED. PER SECTION 94-113, CALCULATIONS FOR
 NUMBER OF REQUIRED STREET TREES NEED TO BE CORRECTED.
 LIST TOTAL LENGTH OF EACH PROPERTY LINE SEGMENT, DIVIDE
 BY 30, THEN INDICATE THE NUMBER OF TREES REQUIRED,
 ROUNDING UP FOR ANY PORTION LEFT. ACCESSWAYS ARE NOT
 DEDUCTED.
  
 4. PARTIALLY SATISFIED. THE WEST STREETSCAPE DOES NOT
 MEET THE REQUIREMENTS FOR PLACEMENT OR NUMBER OF THE
 REQUIRED STREET TREES ALONG THE CURB. THE MEDIAN
 PLACEMENT OF TREES DO NOT MEET THE INTENT OF PROVIDING
 TREE CANOPY OVER THE PEDESTRIAN AREAS OF THE
 STREETSCAPE.
  
 THE RESPONSE TO COMMENT DID NOT INCLUDE THE WAIVER
 REQUEST FOR THE WEST STREETSCAPE SEGMENT AS INDICATED
 ON SHEET LP-1. 4 TREES ARE PROVIDED IN THE STREETSCAPE,
 STAFF DISCUSSED AND REQUESTS ADDING ONE ADDITIONAL TREE
 ON EACH SIDE OF THE DROPOFF CANOPY TO PROVIDE
 ADDITIONAL SHADE FOR THE SIDEWALK AREA AND ADDING THE
 REMAINING 3 TREES TO THE PLAZA PUBLIC OPEN SPACE TO
 PROVIDE ADDITIONAL PEDESTRIAN SHADE. THIS MEETS THE
 INTENT OF THE STREETSCAPE REQUIREMENTS.
 TREES ADDED IN QUADRILLE MEDIAN DO NOT CONTRIBUTE TO
 SHADE FOR PEDESTRIANS BUT WILL IMPROVE THE AESTHETICS.
 STAFF SUGGESTS THE USE OF BULNESIA ARBOREA TO FOLLOW
 THE PATTERN ON QUADRILLE AND ALABAMA AVENUE ADJACENT TO
 RESTORATION HARDWARE SITE.
  
  
  
 5. SATISFIED. FLORIDA FRIENDLY DESIGN OPTIONS POINTS
 CANNOT BE COUNTED FOR 51% OR MORE NATIVE GROUNDCOVER,
 AS THEY ARE ALL NON-NATIVE. POINTS CANNOT BE COUNTED
 FOR 51% OR MORE NATIVE SHRUBS, AS THEY ARE ALL
 NON-NATIVE.
  
 6. SATISFIED. CORRECT IN THE PLANT LIST: NATCHEZ CRAPE
 MYRTLE IS NOT FLORIDA NATIVE. AGAVE AMERICANA IS NOT
 FLORIDA NATIVE.
  
 7. SATISFIED. SHOW LOCATIONS OF UTILITY LINES ON
 LANDSCAPE PLAN, ALSO LOCATIONS OF VALVES AND BACKFLOW
 PREVENTERS AND FPL TRANSFORMERS. SCREENING MUST BE
 PROVIDED. THERE ARE CONFLICTS BETWEEN UTILITIES AND
 LANDSCAPING THAT WILL HAVE TO BE RESOLVED.
  
 8. SATISFIED. PER SECTION 94-113, ADJUST LOCATIONS OF
 REQUIRED STRUCTURAL SOIL TO ONLY SHOW UNDER HARDSCAPE
 ADJACENT TO STREET TREES. AREA FOR STRUCTURAL SOIL AND
 PLANTING AREA SHOULD BE APPROXIMATELY 14 FEET IN LENGTH
 AND 9 FEET IN WIDTH RELATIVE TO THE BACK OF CURB.
 STRUCTURAL SOIL DETAIL IS TO SHOW THE CONSTRUCTION
 CROSS SECTION FOR DEPTH OF 36 INCHES, AND PLANTING SOIL
 IN THE PLANTING AREA. DO NOT INCLUDE TREE GRATES UNLESS
 NEEDED FOR ADA TRAVEL WIDTH. CORRECT THE DETAIL TO
 REFLECT THIS.
  
 ADDITIONAL COMMENTS 5/4/21:
  
 9. CORRECT THE TREES PROVIDED FOR MITIGATION PROVIDED
 ON THE TREE DISPOSITION SHEET TD-1 TO MATCH THE PLANT
 LIST. CATHEDRAL OAK, NOT HIGHRISE OAK.
  
 10. PROVIDE PRELIMINARY FDOT APPROVAL FOR ALL TREES IN
 THE FDOT RIGHT OF WAY.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION. LOCATIONS OF
 ROYAL PALMS TO BE TRANSPLANTED WILL BE DETERMINED AT
 TIME OF PERMIT.
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF
 WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A
 SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  

Review Stop L LANDSCAPING
Rev No 1 Status F Date 01-13-2021 Cont ID  
Sent By rcaranci Date 01-13-2021 Time 17:33 Rev Time 0.00
Received By rcaranci Date 01-13-2021 Time 17:33 Sent To  
Notes
2021-01-13 17:33:56FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: WEST PALM POINT Z20120016
 JANUARY 13, 2021
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. MAKE THE FOLLOWING CORRECTIONS TO THE TREE
 DISPOSITION PLAN AND THE TREE INVENTORY LIST:
 ? EXPLAIN WHERE THE RELOCATED ROYAL PALMS WILL BE
 PLANTED
 ? #12 FICUS WOULD BE 300 SQ FT MITIGATION
 ? #13 WASHINGTONIA PALM IS CATEGORY 4, SO 50 SQ FT
 MITIGATION
 ? CORRECT SPELLING FOR MITIGATION REQ (SF) COLUMN
  
 2. LIST THE TREE SPECIES AND SQUARE FOOTAGE CREDIT FOR
 THE OPEN SPACE SQUARE FOOTAGE CALCULATIONS FOR EACH
 OPEN SPACE. PERCENTAGES DO NOT MEET THE REQUIREMENTS
 FOR THE ENTIRE PRIVATE OPEN SPACE SO AN AREA MEETING
 THE REQUIREMENTS NEEDS TO BE DESIGNATED.
  
 3. PER SECTION 94-113, CALCULATIONS FOR NUMBER OF
 REQUIRED STREET TREES NEED TO BE CORRECTED. LIST TOTAL
 LENGTH OF EACH PROPERTY LINE SEGMENT, DIVIDE BY 30,
 THEN INDICATE THE NUMBER OF TREES REQUIRED, ROUNDING UP
 FOR ANY PORTION LEFT. ACCESSWAYS ARE NOT DEDUCTED.
  
 4. THE WEST STREETSCAPE DOES NOT MEET THE REQUIREMENTS
 FOR PLACEMENT OR NUMBER OF THE REQUIRED STREET TREES
 ALONG THE CURB. THE MEDIAN PLACEMENT OF TREES DO NOT
 MEET THE INTENT OF PROVIDING TREE CANOPY OVER THE
 PEDESTRIAN AREAS OF THE STREETSCAPE.
  
  
 5. FLORIDA FRIENDLY DESIGN OPTIONS POINTS CANNOT BE
 COUNTED FOR 51% OR MORE NATIVE GROUNDCOVER, AS THEY ARE
 ALL NON-NATIVE. POINTS CANNOT BE COUNTED FOR 51% OR
 MORE NATIVE SHRUBS, AS THEY ARE ALL NON-NATIVE.
  
 6. CORRECT IN THE PLANT LIST: NATCHEZ CRAPE MYRTLE IS
 NOT FLORIDA NATIVE. AGAVE AMERICANA IS NOT FLORIDA
 NATIVE.
  
 7. SHOW LOCATIONS OF UTILITY LINES ON LANDSCAPE PLAN,
 ALSO LOCATIONS OF VALVES AND BACKFLOW PREVENTERS AND
 FPL TRANSFORMERS. SCREENING MUST BE PROVIDED. THERE ARE
 CONFLICTS BETWEEN UTILITIES AND LANDSCAPING THAT WILL
 HAVE TO BE RESOLVED.
  
 8. PER SECTION 94-113, ADJUST LOCATIONS OF REQUIRED
 STRUCTURAL SOIL TO ONLY SHOW UNDER HARDSCAPE ADJACENT
 TO STREET TREES. AREA FOR STRUCTURAL SOIL AND PLANTING
 AREA SHOULD BE APPROXIMATELY 14 FEET IN LENGTH AND 9
 FEET IN WIDTH RELATIVE TO THE BACK OF CURB. STRUCTURAL
 SOIL DETAIL IS TO SHOW THE CONSTRUCTION CROSS SECTION
 FOR DEPTH OF 36 INCHES, AND PLANTING SOIL IN THE
 PLANTING AREA. DO NOT INCLUDE TREE GRATES UNLESS NEEDED
 FOR ADA TRAVEL WIDTH. CORRECT THE DETAIL TO REFLECT
 THIS.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF
 WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A
 SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  

Review Stop PARK PARKING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop POLICE POLICE
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PW PUBLIC WORKS
Rev No 2 Status F Date 12-17-2021 Cont ID  
Sent By   Date 12-17-2021 Time   Rev Time 0.00
Received By   Date 12-17-2021 Time   Sent To  
Notes
2021-12-17 14:25:38 
 PLEASE PROVIDE THE FOLLOWINGS:
 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID
 WASTE VOLUME PRODUCED ALONG WITH THE SIZE AND TYPE OF
 THE CONTAINER (I.E. DUMPSTER/COMPACTOR) THAT WILL BE
 UTILIZED THAT WILL BE UTILIZED FOR THE SANITATION
 SERVICE.
 2- DETAILS FOR SANITATION SERVICE (I.E. SOLID WASTE
 CONTAINER(S) TYPE, SIZE, ETC.).
 3- DESIGNATED LOCATION FOR THE BULK ITEM PICK UP
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045

Review Stop PW PUBLIC WORKS
Rev No 1 Status F Date 12-30-2020 Cont ID  
Sent By   Date 12-30-2020 Time   Rev Time  
Received By   Date 12-30-2020 Time   Sent To  
Notes
2020-12-30 10:59:29 
 PLEASE PROVIDE THE FOLLOWINGS:
 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID
 WASTE VOLUME PRODUCED ALONG WITH THE SIZE AND TYPE OF
 THE CONTAINER (I.E. DUMPSTER/COMPACTOR) THAT WILL BE
 UTILIZED THAT WILL BE UTILIZED FOR THE SANITATION
 SERVICE.
  
 2- DETAILS FOR SANITATION SERVICE (I.E. SOLID WASTE
 CONTAINER(S) TYPE, COLLECTION LOCATION, ETC.).
  
 3- AUTO TURN (DYNAMIC ENVELOPE AND THE TIRES PATH) FOR
 THE SANITATION SERVICE, FRONT LOADER TRUCK WITH THE
 FOLLOWING SPECS:
 - TRUCK LENGTH: 35 FT
 - TRUCK WIDTH: 11 FT
 - TURNING RADIUS:
 - SAE TURNING RADIUS: 32.5 FT
 - CURB-TO-CURB DIAMETER: 74 FT
 - WALL-TO-WALL DIAMETER: 86.3 FT
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045

Review Stop STORM STORMWATER
Rev No 1 Status F Date 01-14-2021 Cont ID  
Sent By tward Date 01-14-2021 Time 13:36 Rev Time 0.00
Received By tward Date 01-14-2021 Time 13:38 Sent To  
Notes
2021-01-14 13:37:46THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
  
 1. VERIFY THE SIGN (POSITIVE/NEGATIVE) OF THE
 CONVERSION FACTOR BETWEEN NAVD1988 AND NGVD1929
 VERTICAL DATUMS.
  
 2. LIST THE WATER TABLE ELEVATION AS NAVD1988 WITH
 NGVD1929 IN PARENTHESES.
  
 3. THE LISTED WATER TABLE ELEVATION APPEARS TOO LOW
 GIVEN THE DISTANCE TO THE LAKE WORTH LAGOON. FIELD
 VERIFY THE WET SEASON WATER TABLE ELEVATION. (CAN BE
 PROVIDED DURING ENGINEERING PERMIT APPLICATION).
  
 4. PROVIDE TYPICAL CROSS SECTIONS FROM CENTERLINE OF
 ADJACENT ROADS TO BUILDING FACE AND BETWEEN THE
 BUILDING AND PARKING GARAGE. SHOW AND LABEL THE RIGHT
 OF WAY LINES AND TYPICAL PROPOSED SLOPES.
  
 5. HOW WILL BOTTOM FLOOR OF THE PARKING GARAGE DRAIN?
  
 6. ADD THE DIFFERENT SPOT GRADE SYMBOLS TO THE SHEET
 LEGEND OF SHEET CG101.
  
 7. SHOW UTILITIES ON THE LANDSCAPE PLANS AND HARDSCAPE
 PLANS.
  
 8. SHOW ADA TACTILE SURFACES FOR CURB RAMPS ON THE
 HARDSCAPE PLANS.
  
 9. SHOW AND CALLOUT PERIMETER PLANTER AREAS ON THE
 ENGINEERING PLANS.
  
 10. PERIMETER PLANTER AREA AT NORTHWEST CORNER OF THE
 SITE EXTENDS PAST THE CROSSWALK.
  
 11. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA.
  
 12. NOTE BLEEDERS ARE NOT PERMITTED AS PART OF THE
 CONTROL STRUCTURE USED TO SURCHARGE EXFILTRATION
 TRENCHES.
  
 13. SHOW MILL AND RESURFACING LIMITS FOR THE TRENCH
 CUTS ON THE PGD PLAN.
  
 14. INDICATE WHICH DRAINAGE STRUCTURES AND SIDES WILL
 HAVE PRB'S.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. A SFWMD ERP MAY BE REQUIRED. PROVIDE A COPY OF THE
 PERMIT PRIOR TO STARTING CONSTRUCTION.
  
 4. PROVIDE A COPY OF THE DRAINAGE CALCULATIONS WITH THE
 ENGINEERING PERMIT APPLICATION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  

Review Stop SURVEY SURVEYING
Rev No 2 Status F Date 05-11-2021 Cont ID  
Sent By vnoel Date 05-11-2021 Time 10:07 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
2021-05-11 11:14:561. NEED SIGN-OFFS FROM ALL UTILITIES FOR ANY
 ENCROACHMENT INTO THE 14 FOOT UE.
 2. IF PROPOSED TO BE ABANDONED, APPLICATION NEEDS TO BE
 MADE THROUGH ENGINEERING SERVICES AND SHOWN ON PLANS.
 3. 800 LEVEL ON SHEET A004 SHOWS ENCROACHMENT INTO FDOT
 R/W. NEED WRITTEN APPROVAL AND/OR AERIAL ENCROACHMENT
 EASEMENT FROM FDOT .
 4. DOMESTIC BACKFLOWS CANNOT BE LOCATED WITHIN
 BUILDING. FIRE DEPT. WILL NEED TO APPROVE ANY FIRE LINE
 BACKFLOWS WITHIN BUILDING.

Review Stop SURVEY SURVEYING
Rev No 1 Status F Date 01-12-2021 Cont ID  
Sent By vnoel Date 01-12-2021 Time 07:36 Rev Time  
Received By vnoel Date   Time   Sent To  
Notes
2021-01-12 07:51:121. SURVEY NEEDS TO BE SIGNED AND SEALED.
 2. WEST PROPERTY CORNERS ARE MISSING.
 3. ADD CONVERSION TO NGVD-29.
 4. TITLE SEARCH REPORT INFORMATION IS MISSING.
 5. PROPERTY WILL BE REQUIRED TO BE RE-PLATTED.
 6. LABEL DIXIE HWY.
 7. SURVEY SHOULD BE CLASSIFIED AS BOUNDARY &
 TOPOGRAPHIC SURVEY.
 8. CHECK LEGAL DESCRIPTION FOR SPELLING.

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 4 Status F Date 12-22-2021 Cont ID  
Sent By   Date 12-22-2021 Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
2021-12-22 17:13:03TRAFFIC COMMENTS
 1) SATISFIED. PROVIDE COUNTY TPS LETTER
 2) SATISFIED. KEEP DRIVEWAY/WALKWAY LEVELED
 3) NOT SATISFIED. CONFIRM OR PROVIDE CAPACITY FOR
 PUBLIC TRANSIT VEHICLES STOPS AND POTENTIALLY
 ESTABLISHING A TRANSIT HUB WITHIN THE PROPOSED
 DEVELOPMENT.
 A. SHOWCASE THE PROPOSED RIDE SHARE AREA IN THE SITE
 PLAN
 B. SHOWCASE THE PROPOSED TRANSIT STOP(S) IN THE SITE
 PLAN
 C. PROVIDE A FIGURE SHOWCASING EXISTING TRANSIT
 STOPS/FACILITIES WITHIN HALF A MILE FROM THE SITE
 D. COORDINATE WITH PALM TRAN AND PROVIDE FEEDBACK
 PERTAINING FUTURE AND/OR POTENTIAL TRANSIT ROUTES ALONG
 QUADRILLE, OKEECHOBEE AND LAKEVIEW BLVD
 4) SATISFIED. CLARIFY THE DRIVEWAY FUNCTIONALITY ON THE
 WEST SIDE OF THE DEVELOPMENT ON QUADRILLE BLVD,
 SPECIFICALLY:
 A. ARE VALET OPERATIONS CONDUCTED THERE?
 B. IS IT FOR PICK-UP, DROP-OFF OR BOTH?
 C. IS IT ACCESSIBLE TO ALL VEHICLES OR JUST
 TAXI/UBER/LYFT?
 5) NOT SATISFIED. UNLESS MONITORING IS PROPOSED, THE
 PICK-UP/DROP OFF AREA ON QUADRILLE SHOULD NOT BE
 ACCESSIBLE TO ANY VEHICLE, EXCEPT FOR TRANSIT,
 EMERGENCY AND SECURITY OPERATORS. PLEASE
 CONFIRM/ACKOWLEDGE
 6) NOT SATISFIED. PROVIDE MORE DETAILS OF VALET
 OPERATIONS
 A. PROPOSED VALET DROP-OFF LOCATION IS NOT FEASIBLE, AS
 THERE IS NO QUEUE STORAGE LENGTH PROVIDED. TWO QUEUED
 VEHICLES WOULD BLOCK THE GARAGE ACCESS RAMP.
 B. HIGHLIGHT/SHOWCASE VEHICLES' PATH FROM THE
 SECOND-FLOOR DROP-OFF LOCATION TO THE VALET SPOTS ON
 THE FIRST LEVEL
 7) NOT SATISFIED. PROVIDE A VALET SERVICE ANALYSIS
 INCLUSIVE OF A NARRATIVE SHOWCASING OPERATIONAL DETAILS
 (E.G. DAYS/HOURS OF OPERATION, NUMBER OF ATTENDANTS,
 QUEUE ANALYSIS, SIGNAGE, ETC.)
 8) NOT SATISFIED. ARE THE TANDEM SPACES ON THE 7TH AND
 8TH FLOOR VALET ONLY? IF SO, THEY SHOULD BE MARKED AND
 TABULATED ACCORDINGLY
 9) NOT SATISFIED. PROVIDE A PARKING TABLE INDICATING
 THE TOTAL NUMBER OF REQUIRED AND PROVIDED PARKING
 SPACES, WITH DETAILED BREAKDOWN OF EACH TYPE (I.E.
 STANDARD, COMPACT, ADA, TANDEM, BICYCLE)
 10) SATISFIED. FEC RAILROAD CROSSING UPGRADE: PROVIDE
 SIDEWALK CONNECTION ALONG OKEECHOBEE BLVD ON THE SOUTH
 SIDE. PROVIDE FDOT PERMIT OR FEEDBACK ON THE MATTER.
 11) SATISFIED. GARAGE ACCESS RAMP ON THE SOUTH SIDE
 SHOULD BE SET PERPENDICULAR TO OKEECHOBEE BLVD, IF BOTH
 INBOUND/OUTBOUND MOVEMENTS ARE CONTEMPLATED
 12) SATISFIED. CONSIDER ONE-WAY OPERATIONS AT
 DRIVEWAYS. FOR EXAMPLE: ENTRY ONLY IN THE SOUTH SIDE,
 EXIT ONLY ON THE NORTH SIDE
 13) SATISFIED. PROVIDE TWO MICRO-MOBILITY DESIGNATED
 AREAS NEARBY BUILDING ENTRANCES. WITH THE FOLLOWING
 CHARACTERISTICS:
 A. DIMENSIONS: 8' X 30'
 B. CONDUIT (2" SCHEDULE 40 PVC) TO A POWER SOURCE WITH
 AN ELECTRICAL PULL BOX (240V CIRCUIT)
 14) SATISFIED. COORDINATE WITH PARKING DEPARTMENT FOR
 PARKING LOSS COMPENSATION/MITIGATION
 15) NOT SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR
 GARBAGE AND SERVICE VEHICLES.
 16) NOT SATISFIED. PROPOSED DRIVEWAYS' WIDTH IS
 EXCESSIVE AND UNSAFE. PROVIDE A MINIMUM OF 5 FEET WIDE
 PEDESTRIAN REFUGE ISLAND BETWEEN SERVICE DRIVE AND
 GARAGE ACCESS/ENTRY
 17) NOT SATISFIED. PROVIDE BICYCLE RACKS NEARBY
 BUILDING ENTRANCE(S) AND DISTINCTIVELY MARK THEM ON
 SITE PLANS
 18) NOT SATISFIED. UNLESS AUTOTURN ANALYSIS PROVES
 PARKING MANEUVERABILITY, REMOVE THE LAST TWO PARKING
 STALLS AT THE DEAD-END ON THE NINTH FLOOR OF THE
 GARAGE.
 19) PARTIALLY SATISFIED. COORDINATE WITH PLANNING
 DEPARTMENT FOR TDM MITIGATION MEASUREMENTS. PROVIDEA
 FINAL AND MUTUALLY AGREED LIST OF TDM MEASUREMENTS
 20) NOT SATISFIED. HOW IS ACCESS TO THE GARAGE SERVICE
 DRIVE INDICATED SIGNAGE-WISE AND HOW IS IT CONTROLLED?
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 3 Status F Date 05-05-2021 Cont ID  
Sent By   Date 05-05-2021 Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
2021-05-05 13:38:20TRAFFIC COMMENTS
 1) SATISFIED. PROVIDE COUNTY TPS LETTER
 2) SATISFIED. KEEP DRIVEWAY/WALKWAY LEVELED
 3) NOT SATISFIED. CONFIRM OR PROVIDE CAPACITY FOR
 PUBLIC TRANSIT VEHICLES STOPS AND POTENTIALLY
 ESTABLISHING A TRANSIT HUB WITHIN THE PROPOSED
 DEVELOPMENT.
 A. SHOWCASE THE PROPOSED RIDE SHARE AREA IN THE SITE
 PLAN
 B. SHOWCASE THE PROPOSED TRANSIT STOP(S) IN THE SITE
 PLAN
 C. PROVIDE A FIGURE SHOWCASING EXISTING TRANSIT
 STOPS/FACILITIES WITHIN HALF A MILE FROM THE SITE
 D. COORDINATE WITH PALM TRAN AND PROVIDE FEEDBACK
 PERTAINING FUTURE AND/OR POTENTIAL TRANSIT ROUTES ALONG
 QUADRILLE, OKEECHOBEE AND LAKEVIEW BLVD
 4) SATISFIED. CLARIFY THE DRIVEWAY FUNCTIONALITY ON THE
 WEST SIDE OF THE DEVELOPMENT ON QUADRILLE BLVD,
 SPECIFICALLY:
 A. ARE VALET OPERATIONS CONDUCTED THERE?
 B. IS IT FOR PICK-UP, DROP-OFF OR BOTH?
 C. IS IT ACCESSIBLE TO ALL VEHICLES OR JUST
 TAXI/UBER/LYFT?
 5) NOT SATISFIED. UNLESS MONITORING IS PROPOSED, THE
 PICK-UP/DROP OFF AREA ON QUADRILLE SHOULD NOT BE
 ACCESSIBLE TO ANY VEHICLE, EXCEPT FOR TRANSIT,
 EMERGENCY AND SECURITY OPERATORS.
 6) NOT SATISFIED. PROVIDE MORE DETAILS OF VALET
 OPERATIONS
 A. PROPOSED VALET DROP-OFF LOCATION IS NOT FEASIBLE, AS
 THERE IS NO QUEUE STORAGE LENGTH PROVIDED. TWO QUEUED
 VEHICLES WOULD BLOCK THE GARAGE ACCESS RAMP.
 B. HIGHLIGHT/SHOWCASE VEHICLES? PATH FROM THE SECOND
 FLOOR DROP-OFF LOCATION TO THE VALET SPOTS ON THE FIRST
 LEVEL
 7) NOT SATISFIED. FEC RAILROAD CROSSING UPGRADE:
 PROVIDE SIDEWALK CONNECTION ALONG OKEECHOBEE BLVD ON
 THE SOUTH SIDE. PROVIDE FDOT PERMIT OR FEEDBACK ON THE
 MATTER.
 8) SATISFIED. GARAGE ACCESS RAMP ON THE SOUTH SIDE
 SHOULD BE SET PERPENDICULAR TO OKEECHOBEE BLVD, IF BOTH
 INBOUND/OUTBOUND MOVEMENTS ARE CONTEMPLATED
 9) SATISFIED. CONSIDER ONE-WAY OPERATIONS AT DRIVEWAYS.
 FOR EXAMPLE: ENTRY ONLY IN THE SOUTH SIDE, EXIT ONLY ON
 THE NORTH SIDE
 10) SATISFIED. PROVIDE TWO MICRO-MOBILITY DESIGNATED
 AREAS NEARBY BUILDING ENTRANCES. WITH THE FOLLOWING
 CHARACTERISTICS:
 A. DIMENSIONS: 8 X 20 FEET
 B. CONDUIT (2 FEET SCHEDULE 40 PVC) TO A POWER SOURCE
 WITH AN ELECTRICAL PULL BOX (240V CIRCUIT)
 11) SATISFIED. COORDINATE WITH PARKING DEPARTMENT FOR
 PARKING LOSS COMPENSATION/MITIGATION
 12) NOT SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR
 GARBAGE AND SERVICE VEHICLES.
 13) NOT SATISFIED. PROPOSED DRIVEWAYS? WIDTH IS
 EXCESSIVE AND UNSAFE. PROVIDE A MINIMUM OF 5 FEET WIDE
 PEDESTRIAN REFUGE ISLAND BETWEEN SERVICE DRIVE AND
 GARAGE ACCESS/ENTRY
 14) NOT SATISFIED. PROVIDE BICYCLE RACKS NEARBY
 BUILDING ENTRANCE(S) AND DISTINCTIVELY MARK THEM ON
 SITE PLANS
 15) NOT SATISFIED. UNLESS AUTOTURN ANALYSIS PROVES
 PARKING MANEUVERABILITY, REMOVE THE LAST TWO PARKING
 STALLS AT THE DEAD-END ON THE NINTH FLOOR OF THE
 GARAGE.
 16) PARTIALLY SATISFIED. COORDINATE WITH PLANNING
 DEPARTMENT FOR TDM MITIGATION MEASUREMENTS. A FINAL AND
 MUTUALLY AGREED LIST OF TDM MEASUREMENTS SHALL BE
 PROVIDED IN ORDER TO PASS THE TRAFFIC ENGINEERING
 REVIEW.
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 2 Status F Date 03-31-2021 Cont ID  
Sent By   Date 03-31-2021 Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
2021-03-31 13:18:32 
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status F Date 01-14-2021 Cont ID  
Sent By   Date 01-14-2021 Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
2021-01-14 11:45:07TRAFFIC COMMENTS
  
 1) PROVIDE COUNTY TPS LETTER
 2) KEEP DRIVEWAY/WALKWAY LEVELED
 3) CONFIRM OR PROVIDE CAPACITY FOR PUBLIC TRANSIT
 VEHICLES STOPS AND POTENTIALLY ESTABLISHING A TRANSIT
 HUB WITHIN THE PROPOSED DEVELOPMENT
 4) CLARIFY THE DRIVEWAY FUNCTIONALITY ON THE WEST SIDE
 OF THE DEVELOPMENT ON QUADRILLE BLVD, SPECIFICALLY:
 4A. ARE VALET OPERATIONS CONDUCTED THERE?
 4B. IS IT FOR PICK-UP, DROP-OFF OR BOTH?
 4C. IS IT ACCESSIBLE TO ALL VEHICLES OR JUST
 TAXI/UBER/LYFT?
 5) PROVIDE MORE DETAILS OF VALET OPERATIONS, IF ANY
 6) FEC RAILROAD CROSSING UPGRADE: PROVIDE SIDEWALK
 CONNECTION ALONG OKEECHOBEE BLVD ON THE SOUTH SIDE
 7) GARAGE ACCESS RAMP ON THE SOUTH SIDE SHOULD BE SET
 PERPENDICULAR TO OKEECHOBEE BLVD, IF BOTH
 INBOUND/OUTBOUND MOVEMENTS ARE CONTEMPLATED
 8) CONSIDER ONE-WAY OPERATIONS AT DRIVEWAYS. FOR
 EXAMPLE: ENTRY ONLY IN THE SOUTH SIDE, EXIT ONLY ON THE
 NORTH SIDE
 9) PROVIDE TWO MICRO-MOBILITY DESIGNATED AREAS NEARBY
 BUILDING ENTRANCES. WITH THE FOLLOWING CHARACTERISTICS:
 9A. DIMENSIONS: 8' X 20'
 9B. CONDUIT (2' SCHEDULE 40 PVC) TO A POWER SOURCE WITH
 AN ELECTRICAL PULL BOX (240V CIRCUIT)
 10) CORDINATE WITH PARKING DEPARTMENT FOR PARKING LOSS
 COMPENSATION/MITIGATION
 11) CORDINATE WITH PLANNING DEPARTMENT FOR TDM
 MITIGATION MEASUREMENTS
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop Z ZONING
Rev No 4 Status F Date 12-21-2021 Cont ID  
Sent By aaponte Date 12-21-2021 Time 12:32 Rev Time 0.00
Received By aaponte Date 12-16-2021 Time 12:32 Sent To  
Notes
2021-12-21 12:43:041. TREES ALONG LAKEVIEW AVE AND OKEECHOBEE AVE SHALL BE
 MOVED OUTSIDE THE PARKING GARAGE LINE OF SIGHT. A
 MINIMUM OF 12 FEET MULTIPURPOSE PATH SHALL BE
 MAINTAINED. SOME ADJUSTMENT WILL BE NEEDED ON THE
 PROPOSED LANDSCAPE DESIGN ADJACENT TO THE OFFICE TOWER
 TO ACCOMMODATE THE LINE OF TREES.
 2. SIDEWALK LEVEL SHALL BE MAINTAINED ACROSS ALL THE
 DRIVEWAYS. PLEASE AJUST THE CIVIL DESIGN TO ENSURE THE
 GRADE ELEVATION IS MAINTAINED.
 3. PARKING GATE IS LOCATED AT THE 2ND LEVEL. WHAT IS
 THE PROPOSAL FOR RETAIL AND VALET PARKING? STAFF
 RECOMMENDS THE GATE TO BE INSTALLED AT THE 3RD LEVEL TO
 ALLOW PARKING FOR CUSTOMERS OR EXPLAIN INTENDED
 OPERATION.
 4. HOW IS THE 2ND LEVEL OFFICE ALONG THE PASEO ACCESSED
 FROM THE ELEVATOR? PLEASE VERIFY COMPLIANCE WITH
 EMERGENCY EXIT REQUIREMENTS.
 5. VALET OPERATION DOES NOT PROVIDE A BY-PASS LANE
 CREATING A POSSIBLE BACK UP FOR CARS. SOME REDESIGN MAY
 BE NEEDED.
 6. ALL TANDEM PARKING SPACES SHALL BE MANAGED BY THE
 VALET OPERATION. PLEASE LABEL ACCORDINGLY.
 7. PLEASE LABEL THE LOCATION OF ALL CAR SHARE AND RIDE
 SHARE SPACES REQUIRED BY THE TDM STRATEGIES.
 8. PLEASE CONFIRM COMPLIANCE WITH OPEN SPACE
 REQUIREMENTS FOR VEGETATION AND TREE CANOPY. THE
 CALCULATION CAN BE DONE OVER A MINIMUM AREA TO COMPLY
 WITH THE PERCENTAGE AND NOT THE LARGER OPEN SPACE
 PROVIDED. (SEE LANDSCAPE COMMENTS)
 9. BUILDING FOOTPRINT PRIVIDED ON SHEET A004 DOES NOT
 MATCH THE WAIVER REQUEST, PLEASE CONFIRM WHAT IS THE
 CORRECT NUMBER.
 10. PLEASE PROVIDE AN EXHIBIT TO CALCULATE THE PROVIDED
 ACTIVE USES AT GROUND FLOOR AND ABOVE TO CONFIRM WAIVER
 REQUEST.
 FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA
 APONTE AT 561-822-1439.

Review Stop Z ZONING
Rev No 3 Status F Date 07-01-2021 Cont ID  
Sent By aaponte Date 07-01-2021 Time 11:59 Rev Time 0.00
Received By aaponte Date 06-02-2021 Time 13:02 Sent To  
Notes
2021-07-01 12:00:14COMMENTS TO 6/2/21 SET
 1. NOT SATISFIED. APPLICANT NEEDS TO SUBMIT A REPORT
 WITH THE REQUIRED CALCULATIONS FOR THE CONVERSION OF
 USES NECESSARY TO ACCOUNT FOR THE OFFICE SQUARE FOOTAGE
 ABOVE THE AVAILABLE POOL. PREVIOUS COMMENT: THE PROJECT
 EXCEEDS THE MAXIMUM SQUARE FOOTAGE CURRENTLY ALLOCATED
 FOR OFFICE IN THE DRI CAPACITY TABLE. BASED ON THE
 LATEST NUMBERS, A CONVERSION FROM OTHER CATEGORY WOULD
 BE NEEDED TO ALLOW 62,833 SF OF ADDITIONAL OFFICE
 SPACE. PLEASE SUBMIT CONVERSION ANALYSIS ACCORDING TO
 ORDINANCE 4412-12.-PREVIOUS COMMENT: PLEASE PROVIDE A
 GROSS SQUARE FOOTAGE CALCULATION FOR EACH USE TO
 DETERMINE THE NEED FOR CONVERSION CAPACITY FROM THE
 CITYPLACE DRI. CURRENTLY THERE IS ONLY 383,429 SF OF
 OFFICE SPACE, AND 32,337 SF OR RETAIL AVAILABLE IN THE
 POOL. IT SEEMS THE GBA OF PROPOSED OFFICE MAY EXCEED
 THE AVAILABLE SF NECESSITATING A SF CONVERSION.
 2. SATISFIED.- PLEASE REVIEW ORDINANCE NO. 4412-12 AND
 PROVIDE CONFIRMATION OF COMPLIANCE FOR ALL APPLICABLE
 ITEMS.
 3. PARTIALLY SATISFIED. PASSAGEWAY SHALL COMPLY WITH
 PUBLIC OPEN SPACE DESIGN STANDARDS IN ORDER TO BE
 COUNTED AS ACTIVE USES, SEATING, VEGETATION AND TREE
 CANOPY SHALL BE INCLUDED IN THE PASSAGE WAY. PREVIOUS
 COMMENTS: STAFF UNDERSTAND WAIVERS ARE REQUESTED.
 PLEASE PROVIDE SCHEMATIC DRAWING INDICATING THE
 COMPLIANCE AT GROUND FLOOR AND THE WAIVERS REQUESTED
 FOR FLOORS 2ND-5TH. IF THE AREA OF THE PASEO MEETS THE
 PUBLIC OPEN SPACE REQUIREMENTS, IT CAN BE COUNTED AS
 ACTIVE USE AS IT IS ADJACENT TO ACTIVE USES ON BOTH
 SIDES.- PREVIOUS COMMENT: PLEASE PROVIDE GRAPHIC
 INFORMATION TO DEMONSTRATE COMPLIANCE WITH THE ACTIVE
 USE REQUIREMENTS.
 4. NOT SATISFIED. SOME SUGGESTIONS TO REDUCE THE NUMBER
 OF WAIVERS REQUESTED:
 A. AS IT SEEMS THE PROPOSED VALET PARKING SPACES ON THE
 GROUND FLOOR ARE NOT USABLE (DUE TO CIRCULATION
 PATTERNS) THE GROUND FLOOR ACTIVE USE ALONG DIXIE HWAY
 COULD BE MODIFIED TO MEET THE MINIMUM DEPTH REQUIRED.
 B. SATISFIED WITH HORIZONTAL VARIATION PROVIDED IN THE
 GARAGE. PREVIOUS COMMENT: PLANAR BREAKS COULD BE
 MEASURED HORIZONTALLY WITH THE VARIATION ON THE
 BUILDING PLANE OF EACH PARKING LEVEL.
 C. NOT SATISFIED: PLEASE PROVIDE ALTERNATIVE LOCATION
 FOR THE REQUIRED TREES. PREVIOUS COMMENT: CONSIDERING
 THE CANOPY AT THE MAIN ENTRANCE IS AT 33? IN HEIGHT,
 TREES MAY BE INSTALLED ALONG THE CURB TO COMPLY WITH
 TREE PLANTING REQUIREMENT.
 PREVIOUS COMMENT: PROJECT IS REQUESTING 22 DIFFERENT
 WAIVERS FROM REGULATIONS. PLEASE FURTHER STUDY OPTIONS
 TO COMPLY WITH CODE REQUIREMENTS OR REDUCE THE WAIVER
 REQUEST. SOME OF THE WAIVERS THAT CAN BE REDUCED
 INCLUDE:
 A. SATISFIED-PORTE COCHERE. CONSIDERING THE DROP-OFF
 AREA ON QUADRILLE CANNOT MEET THE PORTE COCHERE
 REQUIREMENTS STAFF RECOMMENDS UTILIZING A REGULAR
 ON-STREET DROP-OFF.
 B. SATISFIED-TOWER AND GARAGE SEPARATION ARE NOT
 APPLICABLE TO THIS DISTRICT.
 5. SATISFIED. WAIVER REQUESTED. PLEASE PROVIDE SOME
 SECTIONS TO INDICATE THE RELATION BETWEEN THE OFFICE
 TOWER LEVELS AND THE GARAGE LEVELS. IF THE OFFICE
 LEVELS ARE USED, GARAGE LEVELS 8,9 AND 10 SEEM TO
 EXCEED TO MAXIMUM FOOTPRINT (TOWER LEVELS 6 AND 7).THE
 WAIVER REQUEST SHOULD BE FOR THOSE TWO FLOORS TO EXCEED
 THE MAXIMUM 55% BUILDING FOOTPRINT ALLOWED? PREVIOUS
 COMMENT: PROJECT EXCEEDS THE MAXIMUM BUILDING FOOTPRINT
 ALLOWED AT THE 6TH AND 7TH STORY (55%) AND ABOVE 8TH
 STORY (50%) DUE TO THE PARKING GOING UP 10 STORIES.
 JUSTIFICATION LIST THE WAIVER REQUEST TO EXCEED THE
 MAXIMUM BUILDING FOOTPRINT FROM 6TH TO 24TH FLOOR.
 PLEASE CLARIFY WHAT IS THE BUILDING FOOTPRINT PROVIDED
 ABOVE THE 10TH LEVEL. THE PROJECT IS ALLOWED TO EXCEED
 MAXIMUM BUILDING FOOTPRINTS ABOVE THE 5TH FLOOR, BUT IN
 COMPLIANCE WITH THE CONDITIONAL SETBACK, WHICH IS NOT
 PROVIDED AT THIS POINT.
 6. SATISFIED- PLEASE INDICATE LOCATION OF 20
 CARPOOL/VANPOOL AND 10 CAR SHARE STATION PROPOSED AS
 PART OF THE TDM STRATEGIES TO REACH MAXIMUM PARKING
 ALLOWED. PROPOSED PARKING EXCEEDS THE MAXIMUM ALLOWED.
 MAXIMUM PARKING ALLOWED FOR THE PROJECT IS:
 SOFT MAXIMUM = 398,590 SF AT1.5/1,000 = 598 SPACES
 ADDITIONAL .75/1,000 WITH CONTRIBUTION TO TRANSIT = 299
 SPACES
 ADDITIONAL WITH TDM STRATEGIES = 299 SPACES
 TOTAL ALLOWED = 1,196 SPACES ? PARKING PROPOSED ON
 6/2/21 SUBMITTAL IS 1,195
 PARKING PROPOSES ON APRIL 23, 21 VERSION = 1,213 SPACES
 TO INCREASE FROM THE SOFT MAXIMUM THE PROJECT CAN:
 A. CONTRIBUTE TO THE TRANSIT OPERATION FUND (EXACT
 AMOUNT TO BE CALCULATED). THAT WILL ALLOW 299
 ADDITIONAL PARKING SPACES.
 B. THE ADDITIONAL SPACES REQUESTED UP TO THE HARD
 MAXIMUM WOULD REQUIRE THE IMPLEMENTATION OF TDM
 STRATEGIES. PLEASE IDENTIFY WHICH TDM STRATEGIES THE
 PROJECT IS GOING TO IMPLEMENT.
  
 7. NOT SATISFIED . AT LEAST CURB CUT ON LAKEVIEW CAN BE
 REDUCED TO 12? WIDE TRAVEL LANES. WAIVER REQUESTED.
 REFUGE AREA MENTIONED IN THE RESPONSE LETTER IS NOT
 SHOWN IN THE DRAWINGS. PREVIOUS COMMENT: PROPOSED CURB
 CUT EXCEEDS THE MAXIMUM 25 FEET ALLOWED. FURTHER
 DISCUSSION NECESSARY TO DETERMINE IF THE SERVICE DRIVE
 CAN BE REDUCED, OR IF THERE ARE ANY MEASURES TO
 MITIGATE THE IMPACT ON PEDESTRIANS.
 8. SATISFIED. CONDITION TO BE INCLUDED IN APPROVAL-
 SIDEWALK ELEVATION SHALL BE MAINTAINED ACROSS THE
 DRIVEWAY.
 9. SATISFIED- FDOT REQUIRES A PUBLIC PURPOSE LEASE
 REQUEST FOR THE DROP-OFF AREA INITIATED BY CITY OR CRA.
 PLEASE PROVIDE PRE-APPROVAL LETTER FROM FDOT TO CONFIRM
 THEY WILL ACCEPT THE DROP OFF AREA ON QUADRILLE BLVD
 AND THE LOCATION OF THE CURB CUTS.-PREVIOUS COMMENT:
 TPS LETTER FROM COUNTY MENTIONS THE POSSIBLE NEED FOR
 DECELERATION LANES TO ACCESS GARAGE. PLEASE PROVIDE A
 PRE-DETERMINATION LETTER FROM FDOT CONFIRMING THE
 AGENCY APPROVAL FOR THE PROPOSED SIDE PLAN (DRIVEWAYS,
 TREES ETC.)
 10. SATISFIED. PLEASE PROVIDE NARRATIVE ON THE CURB
 SIDE MANAGEMENT OF ON-STREET DROP OFF/PICK UP AREA
 PROPOSED ON QUADRILLE BLVD.- PREVIOUS COMMENT: PLEASE
 PROVIDE FOR A CURB SIDE MANAGEMENT PLAN AND A FREIGHT
 DELIVERY MANAGEMENT PLAN.
 11. SATISFIED. PROPOSED VALET LOCATION IS NOT
 FUNCTIONAL, THE VALET OPERATION IS BLOCKING THE TRAVEL
 LANES. A SEPARATE AREA FOR STACKING IS NEEDED. PLEASE
 INDICATE THE TRAVEL PATHS FOR CARS RECEIVED AT THE 2ND
 FLOOR VALET TO THE GROUND FLOOR VALET PARKING AREA.
 VALET CARS SHOULD NOT CIRCULATE IN THE PUBLIC ROW. ?
 PREVIOUS COMMENT: PLEASE PROVIDE INFORMATION REGARDING
 THE OPERATION OF THE VALET SERVICE FOR THE BUILDING.
 PLEASE IDENTIFY THE LOCATION OF THE VALET PARKING
 DROP-OFF /PICK UP AREA INSIDE THE GARAGE.
 12. TO BE INCLUDED AS A CONDITON OF APPROVAL- DUE TO
 THE PROPOSAL TO INCLUDE TANDEM PARKING SPACES, VALET
 SERVICE WILL BE REQUIRED FOR THE PROJECT. A RESTRICTIVE
 COVENANT WILL BE REQUIRED FOR THE PROJECT.
  
 13. STAFF STILL RECOMMENDS MORE REALISTIC RENDERINGS BE
 PROVIDED FOR STAFF EVALUATION AND PUBLIC MEETINGS.
 STAFF RECOMMENDS MORE REALISTIC RENDERINGS FOR THE PB
 AND CITY COMMISSION MEETING. CAN THE CONCRETE PARAPET
 THAT CREATES THE ILLUSION OF SLAB THICKNESS BE TALLER
 TO FURTHER SCREEN THE CARS FROM VIEW? WHAT ABOUT SOME
 VEGETATION IN SOME OF THE SLAB PROJECTIONS THAT
 COMPLEMENT THE ART INSTALLATION AND HELP SCREEN THE
 CARS?? PREVIOUS COMMENT: ADDITIONAL INFORMATION SHALL
 BE PROVIDED REGARDING THE PROPOSED DESIGN OF THE
 PARKING GARAGE. STAFF RECOMMENDS APPLICANT TO PROVIDE
 DETAILED SECTIONS TO FULLY EXPLAIN THE SPECIAL DESIGN
 OF THE GARAGE SLABS THAT WILL JUSTIFY THE LACK OF
 ACTIVE USES. REALISTIC RENDERING IMAGES ARE ALSO
 RECOMMENDED TO FULLY DEPICT THE IMAGE OF THE GARAGE AND
 ALLOW A COMPLETE UNDERSTANDING OF THE GARAGE IMPACT ON
 THE SURROUNDING. RENDERINGS SHALL BE PROVIDED FROM ALL
 THE DIFFERENT VIEW POINTS OF THE GARAGE (DIXIE,
 LAKEVIEW, OKEECHOBEE) AND FROM STREET LEVEL PERSPECTIVE
 AS WELL AS FROM UPPER LEVELS FROM SURROUNDING
 BUILDINGS.
 PLANS INDICATE SOME OF THE PARKING SPACES AT THE EDGE
 OF THE SLAB, ARE THE CARS VISIBLE FROM OUTSIDE?
 14. NOT SATISFIED. SOME OF THE GARAGE SLABS ENCROACH
 INTO THE MINIMUM REQUIRED SETBACKS. SECTION IN A513
 DOES NOT SEEM TO MATCH FLOOR PLANS BUT SEEMS TO
 INDICATE SOME ADDITIONAL SETBACK ABOVE FLOOR 6TH BEYOND
 THE MINIMUM REQUIRED. PLEASE INDICATE THE MINIMUM
 SETBACK LINE AND THE CONDITIONAL SETBACK FOR PARKING
 USES TO DETERMINE THE EXTENT OF THE WAIVER IN EACH
 PARKING LEVEL. PREVIOUS COMMENT: PLEASE INDICATE THE
 MINIMUM SETBACK IN THE GARAGE SECTIONS TO IDENTIFY THE
 EXTEND OF THE ENCROACHMENTS INDICATED IN THE FLOOR
 PLANS. ARE THE ENCROACHMENTS PROPOSED ARCHITECTURAL
 FEATURES?
 15. NOT SATISFIED. IF THE PROJECT INTENDS TO ASK FOR A
 WAIVER, THE REQUIRED TREES SHALL BE LOCATED ON OTHER
 PARTS OF THE PROJECT OR A MITIGATION FEE PAID INTO THE
 TREE FUND. SOME ADDITIONAL TREES CAN BE INSTALLED NORTH
 AND SOUTH OF THE CANOPY TO BRING THE PROJECT CLOSER
 INTO COMPLIANCE WITH THE REQUIREMENT. PLEASE SUGGEST
 WHERE THE REMAINING TREES CAN BE LOCATION AROUND THE
 PROJECT. PREVIOUS COMMENT: STREET TREES ARE REQUIRED
 ALONG THE QUADRILLE BOULEVARD FRONTAGE EVERY 30 FEET.
 16. SATISFIED. SIDEWALK ALONG THE QUADRILLE FRONTAGE IS
 10 FEET AT ITS NARROWEST POINT. PREVIOUS COMMENT:
 SIDEWALK ALONG QUADRILLE BOULEVARD BY THE BUILDING
 ENTRANCE SHALL BE A MINIMUM OF 8 FEET IN WIDTH.
 17. SATISFIED. PLEASE PROVIDE A FA?ADE DETAIL DEPICTING
 THE TREATMENT OF THE FA?ADE TO ACCOMMODATE THE UTILITY
 ELEMENTS. ALSO PLEASE CLARIFY HOW IS THE ACCESS TO THE
 FIRE BACKFLOW. - PREVIOUS COMMENT: ALL BACKFLOW
 PREVENTORS AND ABOVE GROUND UTILITY CONNECTIONS AT THE
 GROUND LEVEL NEED TO BE SCREENED FROM VIEW. FURTHER
 DISCUSSION IS NECESSARY TO DETERMINE THE MOST
 APPROPRIATE LOCATION. LANDSCAPE DRAWINGS AND SITE PLAN
 DRAWINGS SHALL REFLECT THE PROPOSED LOCATION OF SUCH
 EQUIPMENT.
 18. SATISFIED. SIGNAGE TO BE SUBMITTED - A COMPLETE
 SIGNAGE PACKET SHALL BE SUBMITTED FOR APPROVAL AS PART
 OF THE LEVEL III SITE PLAN APPROVAL PROCESS BY THE CITY
 COMMISSION.
 19. SATISFIED. PLEASE CONFIRM THAT THE DESIGNATED 798
 SF ROOM IS SUFFICIENT TO ACCOMMODATE THE 120 BIKE
 PARKING SPACES. PREVIOUS COMMENT. BIKE PARKING REQUIRED
 IS 120 SPACES. - PREVIOUS COMMENT: THE BIKE STORAGE
 INDICATED ON THE GROUND FLOOR ALONG OKEECHOBEE BLVD
 DOES NOT SEEM ENOUGH TO ACCOMMODATE THE 120 BIKE SPACES
 REQUIRED FOR THE PROJECT (1/10 PARKING SPACES)
 20. NOT SATISFIED. TO BE INCLUDED AS A CONDITION OF
 APPROVAL. SHOWERS MAY BE DISTRIBUTED THROUGHOUT THE
 BUILDING, BUT IT SHALL BE ENSURED THAT ALL TENANTS HAVE
 ACCESS TO A SHOWER FACILITY (13 SHOWERS REQUIRED).
 SHEET A112 WAS NOT INCLUDED IN SUBMITTED SET. BASED ON
 THE 382,211 SF OF NET OFFICE SPACE, THE PROJECT IS
 REQUIRED TO PROVIDE 13 SHOWERS AND CHANGING FACILITIES.
 SHOWERS SHALL BE IN AREAS ACCESSIBLE TO ALL TENANTS.
 PLEASE INDICATE PRELIMINARY LOCATION FOR SITE PLAN
 APPROVAL PROCESS- PREVIOUS COMMENT: PLEASE INDICATE THE
 LOCATION OF THE SHOWER AND CHANGING ROOMS REQUIRED FOR
 THE PROJECT (1 SHOWER AND CHANGING /30,000 SF OF
 OFFICE).
 21. SATISFIED. PLEASE INCLUDE A NOTE CALLING OUT THE
 NON-REFLECTIVE NATURE OF THE GLASS IN THE FA?ADE. -
 PLEASE CONFIRM THE PROPOSED GLASS IS NOT A REFLECTIVE
 GLASS TO CAUSE IMPACT OF DRIVERS.
 22. NOT SATISFIED. PLEASE LAY OUT THE LINE OF SIGHT
 MEETING THE FDOT REQUIREMENTS TO CONFIRM THE LOCATION
 OF THE TREES INDICATED IN THE DRAWINGS MEET FDOT
 REQUIREMENTS. PLEASE OBTAIN A PRE-APPROVAL LETTER FROM
 FDOT TO CONFIRM THEY WILL ALLOW THE PROPOSED PLACEMENT
 OF TREES ALONG THE CURB LINE. - PLEASE CONFIRM FDOT HAS
 APPROVED THE LOCATIONS OF THE PROPOSED TREES ALONG THE
 CURB.
 23. PARTIALLY SATISFIED. WHAT ARE THE FDOT STANDARDS
 FOR A PEDESTRIAN CROSSING? PEDESTRIAN CROSSINGS SHOULD
 HAVE THERMOPLASTIC ZEBRA PATTERN AND ADA RAMPS. ?
 PREVIOUS COMMENT: PLEASE PROVIDE INFORMATION TO CONFIRM
 COMPLIANCE WITH THE PROVISION OF PEDESTRIAN CROSSINGS
 AT ALL INTERSECTIONS.
 24. NOT SATISFIED. 12 BIKE PARKING SPACES SHALL BE
 PROVIDED THROUGHOUT THE PROJECT, CLOSE TO BUILDING
 ENTRANCE AND RETAIL ENTRANCES. BIKE PARKING FOR THE
 GENERAL PUBLIC SHALL BE INSTALLED AROUND THE PROJECT
 WITHIN THE PUBLIC REALM. PLEASE PROVIDE 1 BIKE SPACE
 PER EVERY 100 FEET OF STREET FRONTAGE. THE PROVIDED
 BIKE PARKING INSIDE THE BUILDING IS FOR THE BUILDING
 TENANTS. - PREVIOUS COMMENT: PUBLIC BIKE RACKS ARE
 REQUIRED ALONG THE STREET FRONTAGE AT A RATIO OF ONE
 PARKING SPACE/100 LINEAR FEET OF FRONTAGE.
 25. PARTIALLY SATISFIED. TO BE CONFIRMED DURING
 BUILDING PERMIT. ANY CHANGES IN GRADE ELEVATION BETWEEN
 THE SIDEWALK AND THE FINISHED FLOOR SHALL BE ABSORBED
 INSIDE THE BUILDING. ? PREVIOUS COMMENT: PLEASE PROVIDE
 STREET SECTIONS INCLUDING GROUND FLOOR ELEVATIONS TO
 CONFIRM EXISTING STREET AND SIDEWALK ELEVATIONS CAN BE
 MET WITH THE NEW PROJECT.
 26. SATISFIED. A MAXIMUM OF 30 % OF THE PARKING SPACES
 CAN BE COMPACT SPACES. PLEASE PROVIDE INFORMATION TO
 CONFIRM COMPLIANCE. ? PREVIOUS COMMENT: PLEASE CONFIRM
 YOU DO NOT EXCEED THE MAXIMUM ALLOWABLE COMPACT PARKING
 SPACES FOR THE PROJECT.
 27. THE PARKING PROJECTIONS IN SOME OF THE UPPER FLOORS
 ENCROACH INTO THE MINIMUM SETBACK. PLEASE ADJUST. A
 MAXIMUM 2 FEET FOR ARCHITECTURAL ENCROACHMENT IS
 ALLOWED.
 FOR RESUBMITTAL, PLEASE SUBMIT TWO COPIES OF ALL
 DRAWINGS AND SUPPORTING DOCUMENTATION AND ONE CD WITH
 ELECTRONIC COPIES OF ALL DOCUMENTS AND DRAWINGS. PLEASE
 INCLUDE A RESPONSE LETTER ADDRESSING EACH OF THE
 COMMENTS.
 28. IF THE GROUDN FLOOR PARKING IS GOING TO BE USED BY
 EMPLOYEES, PLEASE INDICATE THE PEDESTRIAN ACCESS TO THE
 PARKING AREA.
  
  

Review Stop Z ZONING
Rev No 2 Status F Date 05-17-2021 Cont ID  
Sent By aaponte Date 05-17-2021 Time 16:10 Rev Time 0.00
Received By aaponte Date 04-23-2021 Time 16:08 Sent To  
Notes
2021-05-17 16:10:14COMMENTS TO 4/23/21 SET
 1. NOT SATISFIED. THE PROJECT EXCEEDS THE MAXIMUM
 SQUARE FOOTAGE CURRENTLY ALLOCATED FOR OFFICE IN THE
 DRI CAPACITY TABLE. BASED ON THE LATEST NUMBERS, A
 CONVERSION FROM OTHER CATEGORY WOULD BE NEEDED TO ALLOW
 62,833 SF OF ADDITIONAL OFFICE SPACE. PLEASE SUBMIT
 CONVERSION ANALYSIS ACCORDING TO ORDINANCE
 4412-12.-PREVIOUS COMMENT: PLEASE PROVIDE A GROSS
 SQUARE FOOTAGE CALCULATION FOR EACH USE TO DETERMINE
 THE NEED FOR CONVERSION CAPACITY FROM THE CITYPLACE
 DRI. CURRENTLY THERE IS ONLY 383,429 SF OF OFFICE
 SPACE, AND 32,337 SF OR RETAIL AVAILABLE IN THE POOL.
 IT SEEMS THE GBA OF PROPOSED OFFICE MAY EXCEED THE
 AVAILABLE SF NECESSITATING A SF CONVERSION.
 2. SATISFIED.- PLEASE REVIEW ORDINANCE NO. 4412-12 AND
 PROVIDE CONFIRMATION OF COMPLIANCE FOR ALL APPLICABLE
 ITEMS.
 3. NOT SATISFIED. STAFF UNDERSTAND WAIVERS ARE
 REQUESTED. PLEASE PROVIDE SCHEMATIC DRAWING INDICATING
 THE COMPLIANCE AT GROUND FLOOR AND THE WAIVERS
 REQUESTED FOR FLOORS 2ND-5TH. IF THE AREA OF THE PASEO
 MEETS THE PUBLIC OPEN SPACE REQUIREMENTS, IT CAN BE
 COUNTED AS ACTIVE USE AS IT IS ADJACENT TO ACTIVE USES
 ON BOTH SIDES.- PREVIOUS COMMENT: PLEASE PROVIDE
 GRAPHIC INFORMATION TO DEMONSTRATE COMPLIANCE WITH THE
 ACTIVE USE REQUIREMENTS.
 4. NOT SATISFIED. SOME SUGGESTIONS TO REDUCE THE NUMBER
 OF WAIVERS REQUESTED:
 A. AS IT SEEMS THE PROPOSED VALET PARKING SPACES ON THE
 GROUND FLOOR ARE NOT USABLE (DUE TO CIRCULATION
 PATTERNS) THE GROUND FLOOR ACTIVE USE ALONG DIXIE HWAY
 COULD BE MODIFIED TO MEET THE MINIMUM DEPTH REQUIRED.
 B. PLANAR BREAKS COULD BE MEASURED HORIZONTALLY WITH
 THE VARIATION ON THE BUILDING PLANE OF EACH PARKING
 LEVEL.
 C. CONSIDERING THE CANOPY AT THE MAIN ENTRANCE IS AT
 33? IN HEIGHT, TREES MAY BE INSTALLED ALONG THE CURB TO
 COMPLY WITH TREE PLANTING REQUIREMENT.
 PREVIOUS COMMENT: PROJECT IS REQUESTING 22 DIFFERENT
 WAIVERS FROM REGULATIONS. PLEASE FURTHER STUDY OPTIONS
 TO COMPLY WITH CODE REQUIREMENTS OR REDUCE THE WAIVER
 REQUEST. SOME OF THE WAIVERS THAT CAN BE REDUCED
 INCLUDE:
 A. SATISFIED-PORTE COCHERE. CONSIDERING THE DROP-OFF
 AREA ON QUADRILLE CANNOT MEET THE PORTE COCHERE
 REQUIREMENTS STAFF RECOMMENDS UTILIZING A REGULAR
 ON-STREET DROP-OFF.
 B. SATISFIED-TOWER AND GARAGE SEPARATION ARE NOT
 APPLICABLE TO THIS DISTRICT.
 5. NOT SATISFIED. PLEASE PROVIDE SOME SECTIONS TO
 INDICATE THE RELATION BETWEEN THE OFFICE TOWER LEVELS
 AND THE GARAGE LEVELS. IF THE OFFICE LEVELS ARE USED,
 GARAGE LEVELS 8,9 AND 10 SEEM TO EXCEED TO MAXIMUM
 FOOTPRINT (TOWER LEVELS 6 AND 7).THE WAIVER REQUEST
 SHOULD BE FOR THOSE TWO FLOORS TO EXCEED THE MAXIMUM
 55% BUILDING FOOTPRINT ALLOWED? PREVIOUS COMMENT:
 PROJECT EXCEEDS THE MAXIMUM BUILDING FOOTPRINT ALLOWED
 AT THE 6TH AND 7TH STORY (55%) AND ABOVE 8TH STORY
 (50%) DUE TO THE PARKING GOING UP 10 STORIES.
 JUSTIFICATION LIST THE WAIVER REQUEST TO EXCEED THE
 MAXIMUM BUILDING FOOTPRINT FROM 6TH TO 24TH FLOOR.
 PLEASE CLARIFY WHAT IS THE BUILDING FOOTPRINT PROVIDED
 ABOVE THE 10TH LEVEL. THE PROJECT IS ALLOWED TO EXCEED
 MAXIMUM BUILDING FOOTPRINTS ABOVE THE 5TH FLOOR, BUT IN
 COMPLIANCE WITH THE CONDITIONAL SETBACK, WHICH IS NOT
 PROVIDED AT THIS POINT.
 6. NOT SATISFIED- PROPOSED PARKING EXCEEDS THE MAXIMUM
 ALLOWED.
 MAXIMUM PARKING ALLOWED FOR THE PROJECT IS:
 SOFT MAXIMUM = 398,590 SF AT1.5/1,000 = 598 SPACES
 ADDITIONAL .75/1,000 WITH CONTRIBUTION TO TRANSIT = 299
 SPACES
 ADDITIONAL WITH TDM STRATEGIES = 299 SPACES
 TOTAL ALLOWED = 1,196 SPACES
 PARKING PROPOSES ON APRIL 23, 21 VERSION = 1,213 SPACES
 TO INCREASE FROM THE SOFT MAXIMUM THE PROJECT CAN:
 A. CONTRIBUTE TO THE TRANSIT OPERATION FUND (EXACT
 AMOUNT TO BE CALCULATED). THAT WILL ALLOW 299
 ADDITIONAL PARKING SPACES.
 B. THE ADDITIONAL SPACES REQUESTED UP TO THE HARD
 MAXIMUM WOULD REQUIRE THE IMPLEMENTATION OF TDM
 STRATEGIES. PLEASE IDENTIFY WHICH TDM STRATEGIES THE
 PROJECT IS GOING TO IMPLEMENT.
  
 7. NOT SATISFIED. REFUGE AREA MENTIONED IN THE RESPONSE
 LETTER IS NOT SHOWN IN THE DRAWINGS. PREVIOUS COMMENT:
 PROPOSED CURB CUT EXCEEDS THE MAXIMUM 25 FEET ALLOWED.
 FURTHER DISCUSSION NECESSARY TO DETERMINE IF THE
 SERVICE DRIVE CAN BE REDUCED, OR IF THERE ARE ANY
 MEASURES TO MITIGATE THE IMPACT ON PEDESTRIANS.
 8. SATISFIED.- SIDEWALK ELEVATION SHALL BE MAINTAINED
 ACROSS THE DRIVEWAY.
 9. NOT SATISFIED PLEASE PROVIDE PRE-APPROVAL LETTER
 FROM FDOT TO CONFIRM THEY WILL ACCEPT THE DROP OFF AREA
 ON QUADRILLE BLVD AND THE LOCATION OF THE CURB
 CUTS.-PREVIOUS COMMENT: TPS LETTER FROM COUNTY MENTIONS
 THE POSSIBLE NEED FOR DECELERATION LANES TO ACCESS
 GARAGE. PLEASE PROVIDE A PRE-DETERMINATION LETTER FROM
 FDOT CONFIRMING THE AGENCY APPROVAL FOR THE PROPOSED
 SIDE PLAN (DRIVEWAYS, TREES ETC.)
 10. PARTIALLY SATISFIED. PLEASE PROVIDE NARRATIVE ON
 THE CURB SIDE MANAGEMENT OF ON-STREET DROP OFF/PICK UP
 AREA PROPOSED ON QUADRILLE BLVD.- PREVIOUS COMMENT:
 PLEASE PROVIDE FOR A CURB SIDE MANAGEMENT PLAN AND A
 FREIGHT DELIVERY MANAGEMENT PLAN.
 11.NOT SATISFIED. PROPOSED VALET LOCATION IS NOT
 FUNCTIONAL, THE VALET OPERATION IS BLOCKING THE TRAVEL
 LANES. A SEPARATE AREA FOR STACKING IS NEEDED. PLEASE
 INDICATE THE TRAVEL PATHS FOR CARS RECEIVED AT THE 2ND
 FLOOR VALET TO THE GROUND FLOOR VALET PARKING AREA.
 VALET CARS SHOULD NOT CIRCULATE IN THE PUBLIC ROW. ?
 PREVIOUS COMMENT: PLEASE PROVIDE INFORMATION REGARDING
 THE OPERATION OF THE VALET SERVICE FOR THE BUILDING.
 PLEASE IDENTIFY THE LOCATION OF THE VALET PARKING
 DROP-OFF /PICK UP AREA INSIDE THE GARAGE.
 12. TO BE INCLUDED AS A CONDITON OF APPROVAL- DUE TO
 THE PROPOSAL TO INCLUDE TANDEM PARKING SPACES, VALET
 SERVICE WILL BE REQUIRED FOR THE PROJECT. A RESTRICTIVE
 COVENANT WILL BE REQUIRED FOR THE PROJECT.
  
 13. PARTIALLY SATISFIED. STAFF RECOMMENDS MORE
 REALISTIC RENDERINGS FOR THE PB AND CITY COMMISSION
 MEETING. CAN THE CONCRETE PARAPET THAT CREATES THE
 ILLUSION OF SLAB THICKNESS BE TALLER TO FURTHER SCREEN
 THE CARS FROM VIEW? WHAT ABOUT SOME VEGETATION IN SOME
 OF THE SLAB PROJECTIONS THAT COMPLEMENT THE ART
 INSTALLATION AND HELP SCREEN THE CARS?? PREVIOUS
 COMMENT: ADDITIONAL INFORMATION SHALL BE PROVIDED
 REGARDING THE PROPOSED DESIGN OF THE PARKING GARAGE.
 STAFF RECOMMENDS APPLICANT TO PROVIDE DETAILED SECTIONS
 TO FULLY EXPLAIN THE SPECIAL DESIGN OF THE GARAGE SLABS
 THAT WILL JUSTIFY THE LACK OF ACTIVE USES. REALISTIC
 RENDERING IMAGES ARE ALSO RECOMMENDED TO FULLY DEPICT
 THE IMAGE OF THE GARAGE AND ALLOW A COMPLETE
 UNDERSTANDING OF THE GARAGE IMPACT ON THE SURROUNDING.
 RENDERINGS SHALL BE PROVIDED FROM ALL THE DIFFERENT
 VIEW POINTS OF THE GARAGE (DIXIE, LAKEVIEW, OKEECHOBEE)
 AND FROM STREET LEVEL PERSPECTIVE AS WELL AS FROM UPPER
 LEVELS FROM SURROUNDING BUILDINGS.
 PLANS INDICATE SOME OF THE PARKING SPACES AT THE EDGE
 OF THE SLAB, ARE THE CARS VISIBLE FROM OUTSIDE?
 14. PARTIALLY SATISFIED. SECTION IN A513 DOES NOT SEEM
 TO MATCH FLOOR PLANS BUT SEEMS TO INDICATE SOME
 ADDITIONAL SETBACK ABOVE FLOOR 6TH BEYOND THE MINIMUM
 REQUIRED. PLEASE INDICATE THE MINIMUM SETBACK LINE AND
 THE CONDITIONAL SETBACK FOR PARKING USES TO DETERMINE
 THE EXTENT OF THE WAIVER IN EACH PARKING LEVEL.
 PREVIOUS COMMENT: PLEASE INDICATE THE MINIMUM SETBACK
 IN THE GARAGE SECTIONS TO IDENTIFY THE EXTEND OF THE
 ENCROACHMENTS INDICATED IN THE FLOOR PLANS. ARE THE
 ENCROACHMENTS PROPOSED ARCHITECTURAL FEATURES?
 15. NOT SATISFIED. SOME ADDITIONAL TREES CAN BE
 INSTALLED NORTH AND SOUTH OF THE CANOPY TO BRING THE
 PROJECT CLOSER INTO COMPLIANCE WITH THE REQUIREMENT.
 PLEASE SUGGEST WHERE THE REMAINING TREES CAN BE
 LOCATION AROUND THE PROJECT. PREVIOUS COMMENT: STREET
 TREES ARE REQUIRED ALONG THE QUADRILLE BOULEVARD
 FRONTAGE EVERY 30 FEET.
 16. SATISFIED. SIDEWALK ALONG THE QUADRILLE FRONTAGE IS
 10 FEET AT ITS NARROWEST POINT. PREVIOUS COMMENT:
 SIDEWALK ALONG QUADRILLE BOULEVARD BY THE BUILDING
 ENTRANCE SHALL BE A MINIMUM OF 8 FEET IN WIDTH.
 17. PARTIALLY SATISFIED. PLEASE PROVIDE A FA?ADE DETAIL
 DEPICTING THE TREATMENT OF THE FA?ADE TO ACCOMMODATE
 THE UTILITY ELEMENTS. ALSO PLEASE CLARIFY HOW IS THE
 ACCESS TO THE FIRE BACKFLOW. - PREVIOUS COMMENT: ALL
 BACKFLOW PREVENTORS AND ABOVE GROUND UTILITY
 CONNECTIONS AT THE GROUND LEVEL NEED TO BE SCREENED
 FROM VIEW. FURTHER DISCUSSION IS NECESSARY TO DETERMINE
 THE MOST APPROPRIATE LOCATION. LANDSCAPE DRAWINGS AND
 SITE PLAN DRAWINGS SHALL REFLECT THE PROPOSED LOCATION
 OF SUCH EQUIPMENT.
 18. NOT SATISFIED. - A COMPLETE SIGNAGE PACKET SHALL BE
 SUBMITTED FOR APPROVAL AS PART OF THE LEVEL III SITE
 PLAN APPROVAL PROCESS BY THE CITY COMMISSION.
 19. SATISFIED. BIKE PARKING REQUIRED IS 120 SPACES. -
 PREVIOUS COMMENT: THE BIKE STORAGE INDICATED ON THE
 GROUND FLOOR ALONG OKEECHOBEE BLVD DOES NOT SEEM ENOUGH
 TO ACCOMMODATE THE 120 BIKE SPACES REQUIRED FOR THE
 PROJECT (1/10 PARKING SPACES)
 20. NOT SATISFIED. SHEET A112 WAS NOT INCLUDED IN
 SUBMITTED SET. BASED ON THE 382,211 SF OF NET OFFICE
 SPACE, THE PROJECT IS REQUIRED TO PROVIDE 13 SHOWERS
 AND CHANGING FACILITIES. SHOWERS SHALL BE IN AREAS
 ACCESSIBLE TO ALL TENANTS. PLEASE INDICATE PRELIMINARY
 LOCATION FOR SITE PLAN APPROVAL PROCESS- PREVIOUS
 COMMENT: PLEASE INDICATE THE LOCATION OF THE SHOWER AND
 CHANGING ROOMS REQUIRED FOR THE PROJECT (1 SHOWER AND
 CHANGING /30,000 SF OF OFFICE).
 21. SATISFIED. PLEASE INCLUDE A NOTE CALLING OUT THE
 NON-REFLECTIVE NATURE OF THE GLASS IN THE FA?ADE. -
 PLEASE CONFIRM THE PROPOSED GLASS IS NOT A REFLECTIVE
 GLASS TO CAUSE IMPACT OF DRIVERS.
 22. NOT SATISFIED. PLEASE OBTAIN A PRE-APPROVAL LETTER
 FROM FDOT TO CONFIRM THEY WILL ALLOW THE PROPOSED
 PLACEMENT OF TREES ALONG THE CURB LINE. - PLEASE
 CONFIRM FDOT HAS APPROVED THE LOCATIONS OF THE PROPOSED
 TREES ALONG THE CURB.
 23. PARTIALLY SATISFIED. PEDESTRIAN CROSSINGS SHOULD
 HAVE THERMOPLASTIC ZEBRA PATTERN AND ADA RAMPS. ?
 PREVIOUS COMMENT: PLEASE PROVIDE INFORMATION TO CONFIRM
 COMPLIANCE WITH THE PROVISION OF PEDESTRIAN CROSSINGS
 AT ALL INTERSECTIONS.
 24. NOT SATISFIED. BIKE PARKING FOR THE GENERAL PUBLIC
 SHALL BE INSTALLED AROUND THE PROJECT WITHIN THE PUBLIC
 REALM. PLEASE PROVIDE 1 BIKE SPACE PER EVERY 100 FEET
 OF STREET FRONTAGE. THE PROVIDED BIKE PARKING INSIDE
 THE BUILDING IS FOR THE BUILDING TENANTS. - PREVIOUS
 COMMENT: PUBLIC BIKE RACKS ARE REQUIRED ALONG THE
 STREET FRONTAGE AT A RATIO OF ONE PARKING SPACE/100
 LINEAR FEET OF FRONTAGE.
 25. PARTIALLY SATISFIED. ANY CHANGES IN GRADE ELEVATION
 BETWEEN THE SIDEWALK AND THE FINISHED FLOOR SHALL BE
 ABSORBED INSIDE THE BUILDING. ? PREVIOUS COMMENT:
 PLEASE PROVIDE STREET SECTIONS INCLUDING GROUND FLOOR
 ELEVATIONS TO CONFIRM EXISTING STREET AND SIDEWALK
 ELEVATIONS CAN BE MET WITH THE NEW PROJECT.
 26. NOT SATISFIED. A MAXIMUM OF 30 % OF THE PARKING
 SPACES CAN BE COMPACT SPACES. PLEASE PROVIDE
 INFORMATION TO CONFIRM COMPLIANCE. ? PREVIOUS COMMENT:
 PLEASE CONFIRM YOU DO NOT EXCEED THE MAXIMUM ALLOWABLE
 COMPACT PARKING SPACES FOR THE PROJECT.
  
 FOR RESUBMITTAL, PLEASE SUBMIT FOUR COPIES OF ALL
 DRAWINGS AND SUPPORTING DOCUMENTATION AND ONE CD WITH
 ELECTRONIC COPIES OF ALL DOCUMENTS AND DRAWINGS. PLEASE
 INCLUDE A RESPONSE LETTER ADDRESSING EACH OF THE
 COMMENTS. THE DEADLINE FOR RESUBMITTAL IS 5/28/21 TO BE
 INCLUDED IN THE JULY 20 PLANNING BOARD AGENDA.
  

Review Stop Z ZONING
Rev No 1 Status F Date 01-13-2021 Cont ID  
Sent By aaponte Date 01-13-2021 Time 18:26 Rev Time 0.00
Received By aaponte Date 12-08-2020 Time 15:23 Sent To  
Notes
2021-01-13 18:28:05 
 1. PLEASE PROVIDE A GROSS SQUARE FOOTAGE CALCULATION
 FOR EACH USE TO DETERMINE THE NEED FOR CONVERSION
 CAPACITY FROM THE CITYPLACE DRI. CURRENTLY THERE IS
 ONLY 383,429 SF OF OFFICE SPACE, AND 32,337 SF OR
 RETAIL AVAILABLE IN THE POOL. IT SEEMS THE GBA OF
 PROPOSED OFFICE MAY EXCEED THE AVAILABLE SF
 NECESSITATING A SF CONVERSION.
 2. PLEASE REVIEW ORDINANCE NO. 4412-12 AND PROVIDE
 CONFIRMATION OF COMPLIANCE FOR ALL APPLICABLE ITEMS.
 3. PLEASE PROVIDE GRAPHIC INFORMATION TO DEMONSTRATE
 COMPLIANCE WITH THE ACTIVE USE REQUIREMENTS.
 4. PROJECT IS REQUESTING 22 DIFFERENT WAIVERS FROM
 REGULATIONS. PLEASE FURTHER STUDY OPTIONS TO COMPLY
 WITH CODE REQUIREMENTS OR REDUCE THE WAIVER REQUEST.
 SOME OF THE WAIVERS THAT CAN BE REDUCED INCLUDE:
 A. PORTE COCHERE. CONSIDERING THE DROP-OFF AREA ON
 QUADRILLE CANNOT MEET THE PORTE COCHERE REQUIREMENTS
 STAFF RECOMMENDS UTILIZING A REGULAR ON-STREET
 DROP-OFF.
 B. TOWER AND GARAGE SEPARATION ARE NOT APPLICABLE TO
 THIS DISTRICT.
 5. PROJECT EXCEEDS THE MAXIMUM BUILDING FOOTPRINT
 ALLOWED AT THE 6TH AND 7TH STORY (55%) AND ABOVE 8TH
 STORY (50%) DUE TO THE PARKING GOING UP 10 STORIES.
 JUSTIFICATION LIST THE WAIVER REQUEST TO EXCEED THE
 MAXIMUM BUILDING FOOTPRINT FROM 6TH TO 24TH FLOOR.
 PLEASE CLARIFY WHAT IS THE BUILDING FOOTPRINT PROVIDED
 ABOVE THE 10TH LEVEL. THE PROJECT IS ALLOWED TO EXCEED
 MAXIMUM BUILDING FOOTPRINTS ABOVE THE 5TH FLOOR, BUT IN
 COMPLIANCE WITH THE CONDITIONAL SETBACK, WHICH IS NOT
 PROVIDED AT THIS POINT.
 6. PROPOSED PARKING EXCEEDS THE SOFT MAXIMUM.
 OFFICE NET INTERIOR = 382,740SF (574-1,149MAX)
 RETAIL NET INTERIOR = 18,818SF (29MIN/58MAX)
 CAFE NET INTERIOR=480SF
  
 AS A RESULT, THE PARKING ALLOWED IS:
 SOFT MAXIMUM PARKING =603 SPACES
 HARD MAXIMUM 1,207 SPACES
  
 TO INCREASE FROM THE SOFT MAXIMUM THE PROJECT CAN:
 1. CONTRIBUTE TO THE TRANSIT OPERATION FUND (EXACT
 AMOUNT TO BE CALCULATED). THAT WILL ALLOW 301
 ADDITIONAL PARKING SPACES.
 2. THE ADDITIONAL SPACES REQUESTED UP TO THE HARD
 MAXIMUM WOULD REQUIRE THE IMPLEMENTATION OF TDM
 STRATEGIES. PLEASE IDENTIFY WHICH TDM STRATEGIES THE
 PROJECT IS GOING TO IMPLEMENT.
  
 7. PROPOSED CURB CUT EXCEEDS THE MAXIMUM 25 FEET
 ALLOWED. FURTHER DISCUSSION NECESSARY TO DETERMINE IF
 THE SERVICE DRIVE CAN BE REDUCED, OR IF THERE ARE ANY
 MEASURES TO MITIGATE THE IMPACT ON PEDESTRIANS.
 8. SIDEWALK ELEVATION SHALL BE MAINTAINED ACROSS THE
 DRIVEWAY.
 9. TPS LETTER FROM COUNTY MENTIONS THE POSSIBLE NEED
 FOR DECELERATION LANES TO ACCESS GARAGE. PLEASE PROVIDE
 A PRE-DETERMINATION LETTER FROM FDOT CONFIRMING THE
 AGENCY APPROVAL FOR THE PROPOSED SIDE PLAN (DRIVEWAYS,
 TREES ETC.)
 10. PLEASE PROVIDE FOR A CURB SIDE MANAGEMENT PLAN AND
 A FREIGHT DELIVERY MANAGEMENT PLAN.
 11.PLEASE PROVIDE INFORMATION REGARDING THE OPERATION
 OF THE VALET SERVICE FOR THE BUILDING. PLEASE IDENTIFY
 THE LOCATION OF THE VALET PARKING DROP-OFF /PICK UP
 AREA INSIDE THE GARAGE.
 12. DUE TO THE PROPOSAL TO INCLUDE TANDEM PARKING
 SPACES, VALET SERVICE WILL BE REQUIRED FOR THE PROJECT.
 A RESTRICTIVE COVENANT WILL BE REQUIRED FOR THE
 PROJECT.
  
 13. ADDITIONAL INFORMATION SHALL BE PROVIDED REGARDING
 THE PROPOSED DESIGN OF THE PARKING GARAGE. STAFF
 RECOMMENDS APPLICANT TO PROVIDE DETAILED SECTIONS TO
 FULLY EXPLAIN THE SPECIAL DESIGN OF THE GARAGE SLABS
 THAT WILL JUSTIFY THE LACK OF ACTIVE USES. REALISTIC
 RENDERING IMAGES ARE ALSO RECOMMENDED TO FULLY DEPICT
 THE IMAGE OF THE GARAGE AND ALLOW A COMPLETE
 UNDERSTANDING OF THE GARAGE IMPACT ON THE SURROUNDING.
 RENDERINGS SHALL BE PROVIDED FROM ALL THE DIFFERENT
 VIEW POINTS OF THE GARAGE (DIXIE, LAKEVIEW, OKEECHOBEE)
 AND FROM STREET LEVEL PERSPECTIVE AS WELL AS FROM UPPER
 LEVELS FROM SURROUNDING BUILDINGS.
 PLANS INDICATE SOME OF THE PARKING SPACES AT THE EDGE
 OF THE SLAB, ARE THE CARS VISIBLE FROM OUTSIDE?
 14.PLEASE INDICATE THE MINIMUM SETBACK IN THE GARAGE
 SECTIONS TO IDENTIFY THE EXTEND OF THE ENCROACHMENTS
 INDICATED IN THE FLOOR PLANS. ARE THE ENCROACHMENTS
 PROPOSED ARCHITECTURAL FEATURES?
 15. STREET TREES ARE REQUIRED ALONG THE QUADRILLE
 BOULEVARD FRONTAGE EVERY 30 FEET.
 16. SIDEWALK ALONG QUADRILLE BOULEVARD BY THE BUILDING
 ENTRANCE SHALL BE A MINIMUM OF 8 FEET IN WIDTH.
 17. ALL BACKFLOW PREVENTORS AND ABOVE GROUND UTILITY
 CONNECTIONS AT THE GROUND LEVEL NEED TO BE SCREENED
 FROM VIEW. FURTHER DISCUSSION IS NECESSARY TO DETERMINE
 THE MOST APPROPRIATE LOCATION. LANDSCAPE DRAWINGS AND
 SITE PLAN DRAWINGS SHALL REFLECT THE PROPOSED LOCATION
 OF SUCH EQUIPMENT.
 18. A COMPLETE SIGNAGE PACKET SHALL BE SUBMITTED FOR
 APPROVAL AS PART OF THE LEVEL III SITE PLAN APPROVAL
 PROCESS BY THE CITY COMMISSION.
 19. THE BIKE STORAGE INDICATED ON THE GROUND FLOOR
 ALONG OKEECHOBEE BLVD DOES NOT SEEM ENOUGH TO
 ACCOMMODATE THE 120 BIKE SPACES REQUIRED FOR THE
 PROJECT (1/10 PARKING SPACES)
 20. PLEASE INDICATE THE LOCATION OF THE SHOWER AND
 CHANGING ROOMS REQUIRED FOR THE PROJECT (1 SHOWER AND
 CHANGING /30,000 SF OF OFFICE).
 21. PLEASE CONFIRM THE PROPOSED GLASS IS NOT A
 REFLECTIVE GLASS TO CAUSE IMPACT OF DRIVERS.
 22. PLEASE CONFIRM FDOT HAS APPROVED THE LOCATIONS OF
 THE PROPOSED TREES ALONG THE CURB.
 23. PLEASE PROVIDE INFORMATION TO CONFIRM COMPLIANCE
 WITH THE PROVISION OF PEDESTRIAN CROSSINGS AT ALL
 INTERSECTIONS.
 24. PUBLIC BIKE RACKS ARE REQUIRED ALONG THE STREET
 FRONTAGE AT A RATIO OF ONE PARKING SPACE/100 LINEAR
 FEET OF FRONTAGE.
 25. PLEASE PROVIDE STREET SECTIONS INCLUDING GROUDN
 FLOOR ELEVATIONS TO CONFIRM EXISTING STREETAND SIDEWALK
 ELEVATIONS CAN BE MET WITH THE NEW PROJECT.
 26. PLEASE CONFIRM YOU DO NOT EXCEED THE MAXIMUM
 ALLOWABLE COMPACT PARKING SPACES FOR THE PROJECT.
  
 FOR RESUBMITTAL, PLEASE SUBMIT FOUR COPIES OF ALL
 DRAWINGS AND SUPPORTING DOCUMENTATION AND ONE CD WITH
 ELECTRONIC COPIES OF ALL DOCUMENTS AND DRAWINGS. PLEASE
 INCLUDE A RESPONSE LETTER ADDRESSING EACH OF THE
 COMMENTS.