| 2020-12-09 20:46:19 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, SITE LIGHTING, SITE LANDSCAPE, SITE | | | IRRIGATION, ETC. | | | | | | 3. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND | | | CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF | | | CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL | | | NEIGHBORING PROPERTIES. | | | | | | 4. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER | | | AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY, | | | INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE | | | CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF | | | NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION | | | THAT MAY AFFECT THE USE OF THEIR PROPERTY. | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
4 |
Status |
P |
Date |
10-22-2021 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
10-22-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
10-22-2021 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
3 |
Status |
F |
Date |
08-27-2021 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
08-27-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
08-27-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-08-27 07:08:30 | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD | | | CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES, | | | PLEASE CONTACT 561-494-2262 OR [email protected]: | | | | | | -LINEAR CONCRETE BENCHES WITH SEATING ARE PROPOSED OVER | | | 18 INCH SEWER MAIN CREATING MAINTENANCE CONFLICT. | | | CREATE SEPARATION DISTANCE SO SEWER MAIN CAN BE | | | EXCAVATED WITHOUT DEMOLISHING CONCRETE BENCHES WITH | | | SEATING. | | | | | | -LANDSCAPE AND ENGINEERING PLANS SHOW A LINEAR CONCRETE | | | BENCH PROPOSED OVER 30 INCH FORCE MAIN, BUT SITE PLAN | | | SHOWS CLEARANCE DISTANCE. PLEASE HAVE ALL PLANS MATCH | | | LOCATION OF LINEAR CONCRETE BENCH. MAKE SURE THERE IS | | | SEPARATION DISTANCE BETWEEN FORCE MAIN AND LINEAR | | | CONCRETE BENCH SO THAT FORCE MAIN CAN BE EXCAVATED | | | WITHOUT DEMOLISHING CONCRETE BENCH. | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
F |
Date |
02-16-2021 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
02-16-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
02-16-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-02-16 08:37:24 | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD | | | CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES, | | | PLEASE CONTACT 561-494-2262 OR [email protected]: | | | | | | -GHOST TRAIN CART STILL APPEARS TO BE A MAINTENANCE | | | CONFLICT FOR THE WATER UTILITIES UNDERNEATH IT AS NOTED | | | IN PRIOR COMMENT. PLEASE RESOLVE THIS CONFLICT, AND | | | PROVIDE EXPLANATION OF HOW RESOLVING. | | | | | | -ARE THE 20INCH DIP WM AND 14INCH FM WHICH ARE LABELED | | | ABANDONED ON SHEET C-8, CURRENTLY ABANDONED OR PROPOSED | | | TO BE ABANDONED? | | | | | | -PLEASE LABEL DISTANCE BETWEEN THE LIGHT POLES NEAR THE | | | 30INCH FM AND ENSURE THAT THE CLEARANCE DISTANCE IS AT | | | LEAST 5FT. | | | | | | -LIGHT POLE NEAR EX. MH-4 APPEARS TO BE TOO CLOSE. | | | PLEASE LABEL CLEARANCE DISTANCE AND ENSURE IT IS AT | | | LEAST 5FT. | | | | | | -IN-GROUND LIGHTING APPEARS TO BE A MAINTENANCE | | | CONFLICT WITH THE 20INCH VCP SS, 18INCH SS, 30INCH FM, | | | AND 1INCH PE WM. PLEASE RESOLVE THOSE CONFLICTS, AND | | | PROVIDE EXPLANATION OF HOW RESOLVING. | | | | | | -PLEASE VERIFY THERE IS A GATE VALVE NEAR THE SOUTHWEST | | | CORNER OF GHOST TRAIN CART, AND LABEL WHAT TYPE ON | | | SHEET C-8. IF VALVE IS STILL FUNCTIONAL, THEN IT WOULD | | | NOT OPERABLE WITH A GHOST TRAIN CART OVER IT ? PLEASE | | | RESOLVE THAT CONFLICT ALSO. | | | | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
12-03-2020 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
12-03-2020 |
Time |
|
Rev Time |
|
| Received By |
rrossano |
Date |
12-03-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-12-03 08:56:28 | 1. THE CITY OF WEST PALM BEACH HAS A NUMBER OF | | | REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY | | | AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND | | | WASTEWATER UTILITIES WITHIN THE CITY. TO VIEW | | | DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AND OTHER | | | ENGINEERING RELATED DOCUMENTS, OPEN A BROWSER IN CHROME | | | AND GO TO: WWW.WPB.ORG/ENGDOCS . TO LOGIN, UNDER | | | ?EMAIL? ENTER [email protected] ; UNDER ?PASSWORD? ENTER | | | SIMPLE321# | | | THERE ARE 4 PAGES OF AVAILABLE ENGINEERING DOCUMENTS | | | FOR YOUR USE. | | | 2. CODE OF ORDINANCES, CITY OF WEST PALM BEACH, | | | FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, ADOPTED | | | SEPT. 22, 2008. (SUPPLEMENT NO. 18) CHAPTER 90 | | | UTILITIES, ARTICLE I. SEC. 90-7. | | | POLICY REGARDING EXTENSION OF WATER OR SEWER SERVICE | | | FACILITIES OF THE CITY: | | | THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE | | | CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY | | | BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS, | | | BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION. | | | 3. AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH | | | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, | | | STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR | | | MORE INFORMATION, OPEN A BROWSER IN CHROME AND GO TO: | | | WWW.WPB.ORG/ENGDOCS .TO LOGIN, UNDER ?EMAIL? ENTER | | | [email protected] ; UNDER ?PASSWORD? ENTER SIMPLE321# | | | CROSS-CONNECTION CONTROL MANUAL IS ON PAGE 4. | | | 4. PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY | | | OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC | | | RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF | | | YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE | | | MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL | | | IN THE WPB ENGINEERING SERVICES DEPARTMENT AT | | | [email protected] OR 561-494-1040 FOR FURTHER | | | ASSISTANCE. | | | 5. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS | | | OF ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES, | | | INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND | | | SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES, | | | METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE | | | SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING | | | GRADES, PIPES SIZES, MATERIALS, ELEVATIONS, | | | ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL | | | INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER | | | LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE | | | PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN | | | VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. | | | PLEASE SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT | | | MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL | | | EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT, | | | INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION & | | | TELECOMMUNICATION FACILITIES LOCATED ON THE | | | RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL | | | UTILITY CROSSINGS. | | | 6. CUT AND CAP UTILITIES NOT IN USE, AND REMOVE ANY | | | ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY | | | ROW. | | | 7. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE | | | DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB | | | DEVELOPMENT APPLICATION). | | | 8. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND | | | PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM | | | AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE | | | PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER. | | | 9. SHOW VERTICAL DATUM AND DATUM CONVERSION INFORMATION | | | (NAVD 88 AND NGVD 29). | | | 10. PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND | | | STORMWATER ALONG ENTIRE PROJECT FRONTAGE. | | | 11. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND | | | IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED | | | AREAS. | | | 12. PLEASE LABEL WATER LINES AS PRIVATE WHERE | | | APPLICABLE. | | | 13. PLEASE PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED | | | LOCATION OF WATER METER AND BACKFLOW PREVENTION. | | | 14. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE | | | SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING | | | PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT | | | HIM AT 561-494-2262 OR [email protected] | | | 15. PROVIDE DEDICATED UTILITY EASEMENTS TO ALLOW ACCESS | | | FOR CITY PERSONNEL TO PROPOSED UTILITY WATER METERS. | | | | | | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD | | | CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES, | | | PLEASE CONTACT 561-494-2262 OR [email protected]: | | | | | | -PLEASE VERIFY ADDRESSING ON WATER AND SEWER PLAN SHEET | | | C-8. PROPERTY APPRAISER LISTS IT WITH A N. SAPODILLA | | | AVE. ADDRESS. | | | -PLEASE MAKE TRAIN CART STAND OUT CLEARER WHEN VIEWING | | | SHEET C-8 THAT IT IS A LARGE OBJECT, AND ADD LABELING | | | TO IT. | | | -TRAIN CART IS PROPOSED TO BE PLACED OVER WATER | | | SERVICE/MAIN UTILITY PIPING. LARGE OBJECTS ARE | | | TYPICALLY NOT ALLOWED TO BE PLACED OVER UTILITY PIPING. | | | NEED MORE INFORMATION ON THE TRAIN CART. FOR | | | MAINTENANCE SUCH AS LEAK REPAIR, OR REPLACEMENT OF | | | WATER UTILITY PIPING, FIELD CREWS NEED TO EXCAVATE THE | | | AREA AND CANNOT WORK UNDER OBJECTS. PLEASE DETAIL HOW | | | THIS CONFLICT WILL BE RESOLVED. | | | | | | -NEAR THE SW CORNER OF THE TRAIN CART, THERE IS AN ICON | | | THAT LOOKS LIKE A GATE VALVE. PLEASE VERIFY IF THAT | | | LOCATION IS CORRECT, WHAT THE GATE VALVE OPERATES, AND | | | IF THE GATE VALVE WILL REMAIN BY PROJECT COMPLETION. | | | GATE VALVES TYPICALLY NEED VERTICAL CLEARANCE TO | | | OPERATE WITH VALVE KEYS. THIS IS POSSIBLE CONFLICT | | | NEEDING CORRECTION. | | | -PLEASE VERIFY THERE WILL BE NO TREES CONFLICTING WITH | | | WATER UTILITIES. TREES WITH ROOTS SHOULD NOT BE PLACED | | | ON TOP OF WATER SERVICES/MAINS OR IN CLOSE PROXIMITY. | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES | | | DEPARTMENT | | | DIRECT: (561) 494-1098 [email protected] | | | | | | THANKS, | | | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES | | | DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR, WEST PALM BEACH, FL | | | 33401 | | | DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE: | | | (561) 246-9525 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
02-24-2021 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
02-24-2021 |
Time |
10:01 |
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
02-24-2021 |
Time |
10:00 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
12-02-2020 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
12-02-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
12-02-2020 |
Time |
14:42 |
Sent To |
|
|
| Notes |
| 2020-12-02 14:44:17 | FIRE HAS NO OBJECTIONS TO THE PROPOSED. | | | | | | SHOULD FUTURE BUILDING PERMITS BE SUBMITTED, FIRE WILL | | | PROVIDE COMMENTS AS APPLICABLE. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
3 |
Status |
P |
Date |
08-26-2021 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
08-26-2021 |
Time |
15:54 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
08-26-2021 |
Time |
15:54 |
Sent To |
|
|
| Notes |
| 2021-08-26 15:54:52 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: CRA LINEAR PARK Z20110019 | | | AUGUST 26, 2021 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. SATISFIED. ON THE TREE DISPOSITION CHART, THE SABAL | | | PALMS ARE SHOWN AS PRESERVE, BUT ARE NOT SHOWN ON THE | | | LANDSCAPE PLAN. OTHER NUMBERED SABALS ARE SHOWN. ADJUST | | | DISPOSITION CHART AND CLARIFY BY ADDING RELOCATED OR | | | EXISTING TO BE PRESERVED SABAL PALMS TO THE LANDSCAPE | | | PLAN AND PLANT LIST. | | | NUMBERED PALMS ARE SHOWN ON THE PLAN BUT NEED TO BE | | | INCLUDED ON THE PLANT LIST. | | | | | | 2. SATISFIED. PROVIDE THE PERVIOUS AND IMPERVIOUS | | | SQUARE FOOTAGE ON THE DATA CHART. | | | | | | 3. SATISFIED. SHOW LOCATIONS OF FPL TRANSFORMERS ON THE | | | LANDSCAPE PLAN AND RESOLVE CONFLICTS WITH LANDSCAPING. | | | | | | 4. SATISFIED. SHOW LOCATIONS OF ALL PROPOSED WATER, | | | SEWER AND DRAINAGE LINES ON THE LANDSCAPE PLAN. | | | | | | 5. SATISFIED. PROVIDE A DETAIL AND LOCATIONS OF ROOT | | | BARRIERS TO SEPARATE LANDSCAPING FROM UTILITY LINES. | | | | | | 6. SATISFIED. PROVIDE SCREENING FOR ALL GROUND MOUNTED | | | VALVES AND EQUIPMENT. | | | | | | 7. SATISFIED. SHOW THE LOCATIONS OF ALL SITE LIGHTING | | | ON THE LANDSCAPE PLAN. | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
F |
Date |
03-01-2021 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
03-01-2021 |
Time |
16:53 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
03-01-2021 |
Time |
16:53 |
Sent To |
|
|
| Notes |
| 2021-03-01 16:54:23 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: CRA LINEAR PARK Z20110019 | | | MARCH 1, 2021 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. PARTIALLY SATISFIED. ON THE TREE DISPOSITION CHART, | | | THE SABAL PALMS ARE SHOWN AS PRESERVE, BUT ARE NOT | | | SHOWN ON THE LANDSCAPE PLAN. OTHER NUMBERED SABALS ARE | | | SHOWN. ADJUST DISPOSITION CHART AND CLARIFY BY ADDING | | | RELOCATED OR EXISTING TO BE PRESERVED SABAL PALMS TO | | | THE LANDSCAPE PLAN AND PLANT LIST. | | | NUMBERED PALMS ARE SHOWN ON THE PLAN BUT NEED TO BE | | | INCLUDED ON THE PLANT LIST. | | | | | | 2. SATISFIED. PROVIDE THE PERVIOUS AND IMPERVIOUS | | | SQUARE FOOTAGE ON THE DATA CHART. | | | | | | 3. SATISFIED. SHOW LOCATIONS OF FPL TRANSFORMERS ON THE | | | LANDSCAPE PLAN AND RESOLVE CONFLICTS WITH LANDSCAPING. | | | | | | 4. SATISFIED. SHOW LOCATIONS OF ALL PROPOSED WATER, | | | SEWER AND DRAINAGE LINES ON THE LANDSCAPE PLAN. | | | | | | 5. SATISFIED. PROVIDE A DETAIL AND LOCATIONS OF ROOT | | | BARRIERS TO SEPARATE LANDSCAPING FROM UTILITY LINES. | | | | | | 6. SATISFIED. PROVIDE SCREENING FOR ALL GROUND MOUNTED | | | VALVES AND EQUIPMENT. | | | | | | 7. SATISFIED. SHOW THE LOCATIONS OF ALL SITE LIGHTING | | | ON THE LANDSCAPE PLAN. | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
12-08-2020 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
12-08-2020 |
Time |
16:18 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
12-08-2020 |
Time |
16:18 |
Sent To |
|
|
| Notes |
| 2020-12-08 16:18:45 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: CRA LINEAR PARK Z20110019 | | | DECEMBER 8, 2020 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. ON THE TREE DISPOSITION CHART, THE SABAL PALMS ARE | | | SHOWN AS PRESERVE, BUT ARE NOT SHOWN ON THE LANDSCAPE | | | PLAN. OTHER NUMBERED SABALS ARE SHOWN. ADJUST | | | DISPOSITION CHART AND CLARIFY BY ADDING RELOCATED OR | | | EXISTING TO BE PRESERVED SABAL PALMS TO THE LANDSCAPE | | | PLAN AND PLANT LIST. | | | | | | 2. PROVIDE THE PERVIOUS AND IMPERVIOUS SQUARE FOOTAGE | | | ON THE DATA CHART. | | | | | | 3. SHOW LOCATIONS OF FPL TRANSFORMERS ON THE LANDSCAPE | | | PLAN AND RESOLVE CONFLICTS WITH LANDSCAPING. | | | | | | 4. SHOW LOCATIONS OF ALL PROPOSED WATER, SEWER AND | | | DRAINAGE LINES ON THE LANDSCAPE PLAN. | | | | | | 5. PROVIDE A DETAIL AND LOCATIONS OF ROOT BARRIERS TO | | | SEPARATE LANDSCAPING FROM UTILITY LINES. | | | | | | 6. PROVIDE SCREENING FOR ALL GROUND MOUNTED VALVES AND | | | EQUIPMENT. | | | | | | 7. SHOW THE LOCATIONS OF ALL SITE LIGHTING ON THE | | | LANDSCAPE PLAN. | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
2 |
Status |
F |
Date |
03-05-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
03-05-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
03-05-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-03-05 08:37:21 | | | | PLEASE PROVIDE LOS (LEVEL OF SERVICE ANALYSIS) TO | | | REFLECT THE SOLID WASTE VOLUME PRODUCED ALONG WITH THE | | | SIZE AND TYPE OF THE CONTAINER THAT WILL BE UTILIZED | | | THAT WILL BE UTILIZED FOR THE SANITATION SERVICE. | | | | | | PLEASE NOTE THE CONTAINERS SHOULD BE FRONT-LOAD TYPE IN | | | ORDER FOR THE CITY TO BE ABLE TO PROVIDE THE SERVICE. | | | | | | DEPT. OF PUBLIC WORKS | | | MATT HEJAZI | | | [email protected] | | | 561-822-2045 | | | |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
F |
Date |
12-10-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
12-10-2020 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
12-10-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-12-10 12:25:19 | PLEASE PROVIDE : | | | 1-LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID | | | WASTE VOLUME PRODUCED ALONG WITH THE SIZE AND TYPE OF | | | THE CONTAINER (I.E. DUMPSTER/COMPACTOR) THAT WILL BE | | | UTILIZED THAT WILL BE UTILIZED FOR THE SANITATION | | | SERVICE. | | | 2- DETAILS FOR SANITATION SERVICE. | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
3 |
Status |
P |
Date |
08-25-2021 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
08-25-2021 |
Time |
11:21 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
08-25-2021 |
Time |
11:25 |
Sent To |
|
|
| Notes |
| 2021-08-25 11:24:54 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 8/10/2021 SUBMITTAL. | | | | | | 1. FOR ENGINEERING PERMIT SUBMITTAL, INCLUDE DETAILS OF | | | THE SOIL TRACKING DEVICE AND OF THE SLOTTED TRENCH | | | DRAIN. | | | | | | TRACY WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | [email protected] | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
F |
Date |
03-11-2021 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
03-11-2021 |
Time |
06:18 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
03-11-2021 |
Time |
06:18 |
Sent To |
|
|
| Notes |
| 2021-03-11 06:17:56 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 2/12/2021 SUBMITTAL: | | | 1. SHOW EXISTING UTILITY POLES ON SHEET C-3. | | | | | | 2. MOVE THE STORMWATER MANHOLE AT THE EAST END OF THE | | | EXFILTRATION TRENCH (OR ENTIRE EXFILTRATION SYSTEM) TO | | | THE WEST AWAY FROM THE UTILITY POLE. | | | | | | 3. HIGH LIGHT ON THE CIVIL PLANS (THROUGH COLOR) WHERE | | | THE RAILROAD TRACK WILL BE LOCATED (WILL REMAIN). THE | | | SITE PLAN SHOWS SEVERAL PLANTING AREAS OVER THE TRACKS. | | | | | | 5. LABEL THE VERTICAL DATUM ON ALL SHEETS THAT CONTAIN | | | ELEVATION INFORMATION (SHEETS C-2, C-3, C-5, C-7) | | | | | | 6. PROVIDE THE WIDTH OF THE EXFILTRATION TRENCH ON THE | | | EXFILTRATION TRENCH DETAIL ON SHEET C-7. | | | | | | TRACY WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | [email protected] | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
12-10-2020 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
12-10-2020 |
Time |
10:58 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
12-10-2020 |
Time |
10:59 |
Sent To |
|
|
| Notes |
| 2020-12-10 10:58:58 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. LABEL VERTICAL DATUM ON SHEET C-7. | | | | | | 2. CONSIDER THE USE OF PERVIOUS PAVERS AND PERVIOUS | | | CONCRETE TO REDUCE THE AMOUNT OF STORMWATER RUNOFF. | | | | | | 3. FOR SECTION A-A ON SHEET C-5, INCLUDE A SWALE IN THE | | | 5' LANDSCAPE STRIP ON THE LEFT SIDE OR INSTALL THE | | | TRENCH DRAIN LOWER THAN THE NORTH PROPERTY LINE TO | | | PREVENT DIRECT RUNOFF TO THE PROPERTY TO THE NORTH. | | | | | | 4. CONFIRM MAINTENANCE EQUIPMENT WILL BE ABLE TO ACCESS | | | THE DRAINAGE STRUCTURES FOR CLEANING POST CONSTRUCTION. | | | | | | 5. SHOW THE EXISTING RAILS ON SECTION A-A ON SHEET C-5 | | | AND HOW STORMWATER RUNOFF WILL REACH THE DRAINAGE | | | SYSTEM. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY | | | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. | | | | | | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED | | | WITH THE ENGINEERING PERMIT APPLICATION. | | | | | | 3. A SFWMD ERP MAY BE REQUIRED. PROVIDE A COPY OF THE | | | PERMIT PRIOR TO STARTING CONSTRUCTION. | | | | | | 4. PROVIDE A COPY OF THE DRAINAGE CALCULATIONS WITH THE | | | ENGINEERING PERMIT APPLICATION. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
3 |
Status |
P |
Date |
09-02-2021 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
09-02-2021 |
Time |
07:49 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-09-02 07:50:25 | CONDITION OF APPROVAL: | | | | | | 1. ART STRUCTURE MUST BE REVIEWED BY ENGINEERING AND | | | PUBLIC UTILITIES PRIOR TO ACCEPTANCE. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
F |
Date |
02-25-2021 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
02-25-2021 |
Time |
15:14 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-02-25 15:24:06 | 1. NO SURVEY IN RESUBMITTAL PACKAGE. | | | 2. SHOW ALL EXISTING AND PROPOSED UTILITIES ON ALL | | | PLANS. | | | 3. COMMENT #26 AND #45 ARE CONTRADICTORY AS TO HOW THE | | | ART STRUCTURE IS ATTACHED. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
12-07-2020 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
12-07-2020 |
Time |
08:08 |
Rev Time |
|
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-12-07 08:24:15 | 1. NO SURVEY PROVIDED. | | | 2. COORDINATE LOCATION OF PROPOSED FPL TRANSFORMER IN | | | NW CORNER.. | | | 3. PROPOSED TRAIN CART MAY CONFLICT WITH PROPOSED | | | MAINTENANCE OF WATER MAIN AND SERVICES. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
12-10-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
12-10-2020 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-12-10 12:19:04 | TRAFFIC COMMENTS: | | | 1. PLEASE CONFIRM THAT THE CABLE CAR IS MOVEABLE ALONG | | | THE TRACKS, AS TO PERMIT ACCESS TO UTILITIES BENEATH IT | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
P |
Date |
10-22-2021 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
10-22-2021 |
Time |
09:29 |
Rev Time |
0.00 |
| Received By |
ckimmerl |
Date |
10-22-2021 |
Time |
09:29 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
08-30-2021 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
08-30-2021 |
Time |
14:02 |
Rev Time |
0.00 |
| Received By |
ckimmerl |
Date |
08-30-2021 |
Time |
13:56 |
Sent To |
|
|
| Notes |
| 2021-08-30 14:01:41 | REGARDING THE PROPOSED CONCRETE BENCHES, UTILITY | | | COMMENTS NOTE THAT SEVERAL PROPOSED BENCHES CONFLICT | | | WITH EXISTING FORCE MAIN AND SEWER LINES. THE BENCHES | | | WOULD NEED TO BE MOVED BACK TO THE GREATEST EXTENT | | | POSSIBLE (MIN. 2 FEET) FROM THESE UTILITY LINES TO | | | PROVIDE ACCESS AND CLEARANCE NECESSARY FOR MAINTENANCE. | | | PLEASE SPECIFY IF THE BENCHES PROPOSED CAN BE MOVED BY | | | HEAVY MACHINERY, IF NOT, MAY NEED TO PROVIDE | | | ALTERNATIVE LIGHTER MATERIAL OR BENCH DESIGNS. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
03-02-2021 |
|
|
Cont ID |
|
| Sent By |
elevesqu |
Date |
03-02-2021 |
Time |
15:43 |
Rev Time |
0.00 |
| Received By |
elevesqu |
Date |
03-02-2021 |
Time |
15:43 |
Sent To |
|
|
| Notes |
| 2021-03-02 15:44:14 | GENERAL: | | | 1. NOT SATISFIED. PLEASE COORDINATE WITH CITY | | | ENGINEERING ON THE DESIGN OF TAMARIND AVENUE AS THE | | | CONSTRUCTION OF FLAGLER STATION AND THE LINEAR PARK | | | PROGRESSES | | | PLEASE INCLUDE TAMARIND AVENUE PLANS THAT HAVE BEEN | | | FINALIZED BY CITY ENGINEERING DEPT. | | | 2. SATISFIED. | | | 3. NOTED, SATISFIED. | | | 4. SATISFIED. STAFF RECOMMENDS HAVING A DISCUSSION WITH | | | CRA, ZONING STAFF AND THE CITY LANDSCAPE PLANNER TO | | | DISCUSS THE FOLLOWING DESIGN ITEMS: | | | A. SATISFIED. | | | B. SATISFIED. | | | C. SATISFIED. | | | D. SATISFIED. | | | E. SATISFIED. | | | F. SATISFIED. | | | G. SATISFIED. | | | H. SATISFIED. | | | 5. ONGOING. THE PROPOSED GHOST TRAIN MAY BE IN CONFLICT | | | WITH AN EXISTING FORCE MAIN. PLEASE INCLUDE PROPOSED | | | DIMENSIONS OF STRUCTURE IF KNOWN OR ESTIMATED | | | DIMENSIONS. CAN THIS BE SHIFTED FURTHER WEST TO AVOID | | | CONFLICTS? | | | THE LATEST ITERATIONS OF THE AIPP CONCEPT THAT PLANNING | | | STAFF HAS SEEN DID NOT INCLUDE ANY OPTION FOR MOBILE | | | RELOCATION. THIS SHALL BE AN ONGOING DISCUSSION BETWEEN | | | PLANNING, ENGINEERING, CRA AND PUBLIC WORKS AS THE AIPP | | | CONCEPT IS REVISED | | | 6. SATISFIED. | | | 7. NOT SATISFIED. PLEASE INDICATE LOCATION OF PRESERVED | | | RAIL TRANSFER PIECE (FOUND ON SITE SEPARATE FROM | | | TRACKS) | | | HISTORIC AND PLANNING STAFF WOULD LIKE TO KEEP THIS | | | RAIL TRANSFER PIECE AS PART OF THE PRESERVATION OF THE | | | LINEAR PARK. THIS PIECE COULD BE INCLUDED IN THE AIPP | | | (SUGGESTION ONLY, NEED TO WORK WITH AIPP) OR STOOD UP | | | INTO PLANTER BED OR LAID INTO GROUND WITHIN PARK. THESE | | | ARE ONLY SUGGESTIONS. PLEASE HAVE DISCUSSIONS WITH | | | AIPP, CRA AND PLANNING | | | LANDSCAPE: | | | 1. SATISFIED. | | | 2. CONDITION OF APPROVAL: PLEASE RETAIN LANDSCAPE | | | SCREENING AROUND FLAGLER STATION?S UTILITIES AS | | | PROPOSED WITH THE PARENT SITE (TO BEST EXTENT | | | POSSIBLE). IS A BENCH PROPOSED IN FRONT OF THIS AREA? | | | PLEASE CLARIFY, THIS WOULD NOT BE A GOOD LOCATION FOR A | | | BENCH DUE TO THE UTILITIES | | | 3. PLEASE DISTINGUISH BETWEEN PROPOSED BENCHES FROM | | | EDGE OF PAVERS THROUGH LABELING OR OTHER MEANS | | | 4. PARTIALLY SATISFIED. PLEASE CONFIRM WITH RAY CARANCI | | | IF SABAL PALMS NUMBER 53, 54, 62, 67 AND 68 SHOULD BE | | | PRESERVED ON SITE OR BETTER TO BE RELOCATED (OR | | | MITIGATED) | | | PLEASE SEE LANDSCAPE COMMENTS | | | | | | | | | CIVIL: | | | 1. SATISFIED. | | | 2. SATISFIED. | | | | | | | | | LIZ LEVESQUE, URBAN DESIGN PLANNER | | | 561 822 1426 | | | [email protected] |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
elevesqu |
Date |
02-12-2021 |
Time |
16:27 |
Sent To |
|
|
| Notes |
| 2021-02-12 16:27:46 | GENERAL: | | | 1. PLEASE COORDINATE WITH CITY ENGINEERING ON THE | | | DESIGN OF TAMARIND AVENUE AS THE CONSTRUCTION OF | | | FLAGLER STATION AND THE LINEAR PARK PROGRESSES | | | 2. PLEASE COORDINATE WITH CITY ENGINEERING AND CGA | | | SOLUTIONS REGARDING THE PROPOSED FPL TRANSFORMER THAT | | | HAS BEEN PROPOSED ALONG THIS PORTION OF TAMARIND AS | | | PART OF THE UNDERGROUNDING PROCESS. THIS WILL NEED TO | | | BE EVALUATED FOR IMPACTS TO THE LINEAR PARK DESIGN | | | 3. STAFF RECOMMENDS HAVING A DISCUSSION WITH CRA, | | | ZONING STAFF AND THE CITY LANDSCAPE PLANNER TO DISCUSS | | | THE FOLLOWING DESIGN ITEMS: | | | A. TYPES OF LIGHT POLES OR LIGHTING THROUGHOUT THE | | | PARK. THIS WILL NEED TO BE LIT FOR SECURITY PURPOSES TO | | | MEET CPTED REQUIREMENTS | | | B. LINEAR BENCH DESIGN AND LOCATION | | | C. EVALUATE IF TREES WOULD BE BETTER AROUND EDGES OF | | | LINEAR PARK RATHER THAN WITHIN THE TRACKS AND KEEP | | | TRACKS MORE OPEN WITH LOWER LANDSCAPE MATERIAL WITHIN | | | TRACKS | | | D. REDUCING THE AMOUNT OF HARDSCAPE MATERIAL | | | SURROUNDING THE PROPOSED GHOST TRAIN AND EAST SIDE OF | | | LINEAR PARK AND FOCUSING MORE LANDSCAPE INTO THE DESIGN | | | E. THE PRESERVATION OR REMOVAL OF THE EXISTING | | | LANDSCAPE BEHIND THE LAW OFFICE AT THE PROJECT?S | | | NORTHWEST CORNER (922 2ND STREET) | | | F. ALTERNATIVE METHODS OF STORMWATER DRAINAGE OTHER | | | THAN TRENCH DRAIN ALONG THE ENTIRE NORTH FA?ADE | | | G. IS THERE ANY CONCEPT FOR A FENCE ALONG THE NORTH | | | PART OF THE LINEAR PARK OR WILL THIS BE ACCESSIBLE | | | THROUGH THE BACK OF ALL PROPERTIES? | | | H. PLEASE SUBMIT APPROVAL FROM WPB CRA FOR ANY | | | RESUBMITTAL REFERENCING PLAN DATES | | | 4. THE PROPOSED GHOST TRAIN MAY BE IN CONFLICT WITH AN | | | EXISTING FORCE MAIN. PLEASE INCLUDE PROPOSED DIMENSIONS | | | OF STRUCTURE IF KNOWN OR ESTIMATED DIMENSIONS. CAN THIS | | | BE SHIFTED FURTHER WEST TO AVOID CONFLICTS? | | | 5. PLEASE DETERMINE WHICH RAIL TIES WILL BE PRESERVED | | | AND INDICATE ON PLANS | | | 6. PLEASE INDICATE LOCATION OF PRESERVED RAIL TRANSFER | | | PIECE (FOUND ON SITE SEPARATE FROM TRACKS) | | | LANDSCAPE: | | | 7. PLEASE INCLUDE A LARGER TREE TYPE WITHIN THE PLANTER | | | BED AT THE LINEAR PARK?S EASTERN EDGE | | | 8. PLEASE RETAIN LANDSCAPE SCREENING AROUND FLAGLER | | | STATION?S UTILITIES AS PROPOSED WITH THE PARENT SITE | | | (TO BEST EXTENT POSSIBLE). IS A BENCH PROPOSED IN FRONT | | | OF THIS AREA? PLEASE CLARIFY, THIS WOULD NOT BE A GOOD | | | LOCATION FOR A BENCH DUE TO THE UTILITIES | | | 9. PLEASE DISTINGUISH BETWEEN PROPOSED BENCHES FROM | | | EDGE OF PAVERS THROUGH LABELING OR OTHER MEANS | | | 10. PLEASE CONFIRM WITH RAY CARANCI IF SABAL PALMS | | | NUMBER 53, 54, 62, 67 AND 68 SHOULD BE PRESERVED ON | | | SITE OR BETTER TO BE RELOCATED (OR MITIGATED) | | | | | | | | | CIVIL: | | | 11. ALTERNATIVE METHODS OF STORMWATER DRAINAGE OTHER | | | THAN TRENCH DRAIN ALONG THE ENTIRE NORTH FA?ADE. PLEASE | | | EVALUATE IF DRAINAGE CAN BE INVERTED INTO CENTER TRACK | | | AREA (MAJORITY LANDSCAPE MAY BE HERE) | | | 12. WHY IS A TRENCH DRAIN NECESSARY FOR THIS LINEAR | | | PARK? | | | | | | LIZ LEVESQUE, URBAN DESIGN PLANNER | | | 561 822 1426 | | | [email protected] |
|
|
| |