Plan Review Stops For Project Z20110019
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 02-12-2021 Cont ID  
Sent By rbrown Date 12-09-2020 Time 20:44 Rev Time 0.00
Received By elevesqu Date 12-09-2020 Time 20:44 Sent To  
Notes
2020-12-09 20:46:19DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR THE BUILDING PERMIT APPLICATION.
  
 2. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SIGNS, SITE LIGHTING, SITE LANDSCAPE, SITE
 IRRIGATION, ETC.
  
 3. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND
 CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF
 CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL
 NEIGHBORING PROPERTIES.
  
 4. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER
 AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY,
 INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE
 CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF
 NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION
 THAT MAY AFFECT THE USE OF THEIR PROPERTY.
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 4 Status P Date 10-22-2021 Cont ID  
Sent By rrossano Date 10-22-2021 Time   Rev Time 0.00
Received By rrossano Date 10-22-2021 Time   Sent To  
Notes
***NONE***

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 3 Status F Date 08-27-2021 Cont ID  
Sent By rrossano Date 08-27-2021 Time   Rev Time 0.00
Received By rrossano Date 08-27-2021 Time   Sent To  
Notes
2021-08-27 07:08:30THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD
 CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES,
 PLEASE CONTACT 561-494-2262 OR [email protected]:
  
 -LINEAR CONCRETE BENCHES WITH SEATING ARE PROPOSED OVER
 18 INCH SEWER MAIN CREATING MAINTENANCE CONFLICT.
 CREATE SEPARATION DISTANCE SO SEWER MAIN CAN BE
 EXCAVATED WITHOUT DEMOLISHING CONCRETE BENCHES WITH
 SEATING.
  
 -LANDSCAPE AND ENGINEERING PLANS SHOW A LINEAR CONCRETE
 BENCH PROPOSED OVER 30 INCH FORCE MAIN, BUT SITE PLAN
 SHOWS CLEARANCE DISTANCE. PLEASE HAVE ALL PLANS MATCH
 LOCATION OF LINEAR CONCRETE BENCH. MAKE SURE THERE IS
 SEPARATION DISTANCE BETWEEN FORCE MAIN AND LINEAR
 CONCRETE BENCH SO THAT FORCE MAIN CAN BE EXCAVATED
 WITHOUT DEMOLISHING CONCRETE BENCH.
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 2 Status F Date 02-16-2021 Cont ID  
Sent By rrossano Date 02-16-2021 Time   Rev Time 0.00
Received By rrossano Date 02-16-2021 Time   Sent To  
Notes
2021-02-16 08:37:24THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD
 CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES,
 PLEASE CONTACT 561-494-2262 OR [email protected]:
  
 -GHOST TRAIN CART STILL APPEARS TO BE A MAINTENANCE
 CONFLICT FOR THE WATER UTILITIES UNDERNEATH IT AS NOTED
 IN PRIOR COMMENT. PLEASE RESOLVE THIS CONFLICT, AND
 PROVIDE EXPLANATION OF HOW RESOLVING.
  
 -ARE THE 20INCH DIP WM AND 14INCH FM WHICH ARE LABELED
 ABANDONED ON SHEET C-8, CURRENTLY ABANDONED OR PROPOSED
 TO BE ABANDONED?
  
 -PLEASE LABEL DISTANCE BETWEEN THE LIGHT POLES NEAR THE
 30INCH FM AND ENSURE THAT THE CLEARANCE DISTANCE IS AT
 LEAST 5FT.
  
 -LIGHT POLE NEAR EX. MH-4 APPEARS TO BE TOO CLOSE.
 PLEASE LABEL CLEARANCE DISTANCE AND ENSURE IT IS AT
 LEAST 5FT.
  
 -IN-GROUND LIGHTING APPEARS TO BE A MAINTENANCE
 CONFLICT WITH THE 20INCH VCP SS, 18INCH SS, 30INCH FM,
 AND 1INCH PE WM. PLEASE RESOLVE THOSE CONFLICTS, AND
 PROVIDE EXPLANATION OF HOW RESOLVING.
  
 -PLEASE VERIFY THERE IS A GATE VALVE NEAR THE SOUTHWEST
 CORNER OF GHOST TRAIN CART, AND LABEL WHAT TYPE ON
 SHEET C-8. IF VALVE IS STILL FUNCTIONAL, THEN IT WOULD
 NOT OPERABLE WITH A GHOST TRAIN CART OVER IT ? PLEASE
 RESOLVE THAT CONFLICT ALSO.
  
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status F Date 12-03-2020 Cont ID  
Sent By rrossano Date 12-03-2020 Time   Rev Time  
Received By rrossano Date 12-03-2020 Time   Sent To  
Notes
2020-12-03 08:56:281. THE CITY OF WEST PALM BEACH HAS A NUMBER OF
 REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY
 AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND
 WASTEWATER UTILITIES WITHIN THE CITY. TO VIEW
 DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AND OTHER
 ENGINEERING RELATED DOCUMENTS, OPEN A BROWSER IN CHROME
 AND GO TO: WWW.WPB.ORG/ENGDOCS . TO LOGIN, UNDER
 ?EMAIL? ENTER [email protected] ; UNDER ?PASSWORD? ENTER
 SIMPLE321#
 THERE ARE 4 PAGES OF AVAILABLE ENGINEERING DOCUMENTS
 FOR YOUR USE.
 2. CODE OF ORDINANCES, CITY OF WEST PALM BEACH,
 FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, ADOPTED
 SEPT. 22, 2008. (SUPPLEMENT NO. 18) CHAPTER 90
 UTILITIES, ARTICLE I. SEC. 90-7.
 POLICY REGARDING EXTENSION OF WATER OR SEWER SERVICE
 FACILITIES OF THE CITY:
 THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE
 CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY
 BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS,
 BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION.
 3. AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR
 MORE INFORMATION, OPEN A BROWSER IN CHROME AND GO TO:
 WWW.WPB.ORG/ENGDOCS .TO LOGIN, UNDER ?EMAIL? ENTER
 [email protected] ; UNDER ?PASSWORD? ENTER SIMPLE321#
 CROSS-CONNECTION CONTROL MANUAL IS ON PAGE 4.
 4. PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY
 OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC
 RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF
 YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE
 MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL
 IN THE WPB ENGINEERING SERVICES DEPARTMENT AT
 [email protected] OR 561-494-1040 FOR FURTHER
 ASSISTANCE.
 5. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS
 OF ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES,
 INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND
 SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES,
 METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE
 SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING
 GRADES, PIPES SIZES, MATERIALS, ELEVATIONS,
 ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL
 INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER
 LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE
 PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN
 VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS.
 PLEASE SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL
 EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT,
 INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES LOCATED ON THE
 RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL
 UTILITY CROSSINGS.
 6. CUT AND CAP UTILITIES NOT IN USE, AND REMOVE ANY
 ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY
 ROW.
 7. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE
 DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB
 DEVELOPMENT APPLICATION).
 8. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM
 AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE
 PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER.
 9. SHOW VERTICAL DATUM AND DATUM CONVERSION INFORMATION
 (NAVD 88 AND NGVD 29).
 10. PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND
 STORMWATER ALONG ENTIRE PROJECT FRONTAGE.
 11. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND
 IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED
 AREAS.
 12. PLEASE LABEL WATER LINES AS PRIVATE WHERE
 APPLICABLE.
 13. PLEASE PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED
 LOCATION OF WATER METER AND BACKFLOW PREVENTION.
 14. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING
 PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT
 HIM AT 561-494-2262 OR [email protected]
 15. PROVIDE DEDICATED UTILITY EASEMENTS TO ALLOW ACCESS
 FOR CITY PERSONNEL TO PROPOSED UTILITY WATER METERS.
  
 THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD
 CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES,
 PLEASE CONTACT 561-494-2262 OR [email protected]:
  
 -PLEASE VERIFY ADDRESSING ON WATER AND SEWER PLAN SHEET
 C-8. PROPERTY APPRAISER LISTS IT WITH A N. SAPODILLA
 AVE. ADDRESS.
 -PLEASE MAKE TRAIN CART STAND OUT CLEARER WHEN VIEWING
 SHEET C-8 THAT IT IS A LARGE OBJECT, AND ADD LABELING
 TO IT.
 -TRAIN CART IS PROPOSED TO BE PLACED OVER WATER
 SERVICE/MAIN UTILITY PIPING. LARGE OBJECTS ARE
 TYPICALLY NOT ALLOWED TO BE PLACED OVER UTILITY PIPING.
 NEED MORE INFORMATION ON THE TRAIN CART. FOR
 MAINTENANCE SUCH AS LEAK REPAIR, OR REPLACEMENT OF
 WATER UTILITY PIPING, FIELD CREWS NEED TO EXCAVATE THE
 AREA AND CANNOT WORK UNDER OBJECTS. PLEASE DETAIL HOW
 THIS CONFLICT WILL BE RESOLVED.
  
 -NEAR THE SW CORNER OF THE TRAIN CART, THERE IS AN ICON
 THAT LOOKS LIKE A GATE VALVE. PLEASE VERIFY IF THAT
 LOCATION IS CORRECT, WHAT THE GATE VALVE OPERATES, AND
 IF THE GATE VALVE WILL REMAIN BY PROJECT COMPLETION.
 GATE VALVES TYPICALLY NEED VERTICAL CLEARANCE TO
 OPERATE WITH VALVE KEYS. THIS IS POSSIBLE CONFLICT
 NEEDING CORRECTION.
 -PLEASE VERIFY THERE WILL BE NO TREES CONFLICTING WITH
 WATER UTILITIES. TREES WITH ROOTS SHOULD NOT BE PLACED
 ON TOP OF WATER SERVICES/MAINS OR IN CLOSE PROXIMITY.
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT
 DIRECT: (561) 494-1098 [email protected]
  
 THANKS,
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR, WEST PALM BEACH, FL
 33401
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 02-24-2021 Cont ID  
Sent By pleduc Date 02-24-2021 Time 10:01 Rev Time 0.00
Received By pleduc Date 02-24-2021 Time 10:00 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 12-02-2020 Cont ID  
Sent By pleduc Date 12-02-2020 Time   Rev Time 0.00
Received By pleduc Date 12-02-2020 Time 14:42 Sent To  
Notes
2020-12-02 14:44:17FIRE HAS NO OBJECTIONS TO THE PROPOSED.
  
 SHOULD FUTURE BUILDING PERMITS BE SUBMITTED, FIRE WILL
 PROVIDE COMMENTS AS APPLICABLE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop L LANDSCAPING
Rev No 3 Status P Date 08-26-2021 Cont ID  
Sent By rcaranci Date 08-26-2021 Time 15:54 Rev Time 0.00
Received By rcaranci Date 08-26-2021 Time 15:54 Sent To  
Notes
2021-08-26 15:54:52FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: CRA LINEAR PARK Z20110019
 AUGUST 26, 2021
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. SATISFIED. ON THE TREE DISPOSITION CHART, THE SABAL
 PALMS ARE SHOWN AS PRESERVE, BUT ARE NOT SHOWN ON THE
 LANDSCAPE PLAN. OTHER NUMBERED SABALS ARE SHOWN. ADJUST
 DISPOSITION CHART AND CLARIFY BY ADDING RELOCATED OR
 EXISTING TO BE PRESERVED SABAL PALMS TO THE LANDSCAPE
 PLAN AND PLANT LIST.
 NUMBERED PALMS ARE SHOWN ON THE PLAN BUT NEED TO BE
 INCLUDED ON THE PLANT LIST.
  
 2. SATISFIED. PROVIDE THE PERVIOUS AND IMPERVIOUS
 SQUARE FOOTAGE ON THE DATA CHART.
  
 3. SATISFIED. SHOW LOCATIONS OF FPL TRANSFORMERS ON THE
 LANDSCAPE PLAN AND RESOLVE CONFLICTS WITH LANDSCAPING.
  
 4. SATISFIED. SHOW LOCATIONS OF ALL PROPOSED WATER,
 SEWER AND DRAINAGE LINES ON THE LANDSCAPE PLAN.
  
 5. SATISFIED. PROVIDE A DETAIL AND LOCATIONS OF ROOT
 BARRIERS TO SEPARATE LANDSCAPING FROM UTILITY LINES.
  
 6. SATISFIED. PROVIDE SCREENING FOR ALL GROUND MOUNTED
 VALVES AND EQUIPMENT.
  
 7. SATISFIED. SHOW THE LOCATIONS OF ALL SITE LIGHTING
 ON THE LANDSCAPE PLAN.
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop L LANDSCAPING
Rev No 2 Status F Date 03-01-2021 Cont ID  
Sent By rcaranci Date 03-01-2021 Time 16:53 Rev Time 0.00
Received By rcaranci Date 03-01-2021 Time 16:53 Sent To  
Notes
2021-03-01 16:54:23FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: CRA LINEAR PARK Z20110019
 MARCH 1, 2021
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. PARTIALLY SATISFIED. ON THE TREE DISPOSITION CHART,
 THE SABAL PALMS ARE SHOWN AS PRESERVE, BUT ARE NOT
 SHOWN ON THE LANDSCAPE PLAN. OTHER NUMBERED SABALS ARE
 SHOWN. ADJUST DISPOSITION CHART AND CLARIFY BY ADDING
 RELOCATED OR EXISTING TO BE PRESERVED SABAL PALMS TO
 THE LANDSCAPE PLAN AND PLANT LIST.
 NUMBERED PALMS ARE SHOWN ON THE PLAN BUT NEED TO BE
 INCLUDED ON THE PLANT LIST.
  
 2. SATISFIED. PROVIDE THE PERVIOUS AND IMPERVIOUS
 SQUARE FOOTAGE ON THE DATA CHART.
  
 3. SATISFIED. SHOW LOCATIONS OF FPL TRANSFORMERS ON THE
 LANDSCAPE PLAN AND RESOLVE CONFLICTS WITH LANDSCAPING.
  
 4. SATISFIED. SHOW LOCATIONS OF ALL PROPOSED WATER,
 SEWER AND DRAINAGE LINES ON THE LANDSCAPE PLAN.
  
 5. SATISFIED. PROVIDE A DETAIL AND LOCATIONS OF ROOT
 BARRIERS TO SEPARATE LANDSCAPING FROM UTILITY LINES.
  
 6. SATISFIED. PROVIDE SCREENING FOR ALL GROUND MOUNTED
 VALVES AND EQUIPMENT.
  
 7. SATISFIED. SHOW THE LOCATIONS OF ALL SITE LIGHTING
 ON THE LANDSCAPE PLAN.
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop L LANDSCAPING
Rev No 1 Status F Date 12-08-2020 Cont ID  
Sent By rcaranci Date 12-08-2020 Time 16:18 Rev Time 0.00
Received By rcaranci Date 12-08-2020 Time 16:18 Sent To  
Notes
2020-12-08 16:18:45FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: CRA LINEAR PARK Z20110019
 DECEMBER 8, 2020
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. ON THE TREE DISPOSITION CHART, THE SABAL PALMS ARE
 SHOWN AS PRESERVE, BUT ARE NOT SHOWN ON THE LANDSCAPE
 PLAN. OTHER NUMBERED SABALS ARE SHOWN. ADJUST
 DISPOSITION CHART AND CLARIFY BY ADDING RELOCATED OR
 EXISTING TO BE PRESERVED SABAL PALMS TO THE LANDSCAPE
 PLAN AND PLANT LIST.
  
 2. PROVIDE THE PERVIOUS AND IMPERVIOUS SQUARE FOOTAGE
 ON THE DATA CHART.
  
 3. SHOW LOCATIONS OF FPL TRANSFORMERS ON THE LANDSCAPE
 PLAN AND RESOLVE CONFLICTS WITH LANDSCAPING.
  
 4. SHOW LOCATIONS OF ALL PROPOSED WATER, SEWER AND
 DRAINAGE LINES ON THE LANDSCAPE PLAN.
  
 5. PROVIDE A DETAIL AND LOCATIONS OF ROOT BARRIERS TO
 SEPARATE LANDSCAPING FROM UTILITY LINES.
  
 6. PROVIDE SCREENING FOR ALL GROUND MOUNTED VALVES AND
 EQUIPMENT.
  
 7. SHOW THE LOCATIONS OF ALL SITE LIGHTING ON THE
 LANDSCAPE PLAN.
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop PARK PARKING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop POLICE POLICE
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PW PUBLIC WORKS
Rev No 2 Status F Date 03-05-2021 Cont ID  
Sent By   Date 03-05-2021 Time   Rev Time 0.00
Received By   Date 03-05-2021 Time   Sent To  
Notes
2021-03-05 08:37:21 
 PLEASE PROVIDE LOS (LEVEL OF SERVICE ANALYSIS) TO
 REFLECT THE SOLID WASTE VOLUME PRODUCED ALONG WITH THE
 SIZE AND TYPE OF THE CONTAINER THAT WILL BE UTILIZED
 THAT WILL BE UTILIZED FOR THE SANITATION SERVICE.
  
 PLEASE NOTE THE CONTAINERS SHOULD BE FRONT-LOAD TYPE IN
 ORDER FOR THE CITY TO BE ABLE TO PROVIDE THE SERVICE.
  
 DEPT. OF PUBLIC WORKS
 MATT HEJAZI
 [email protected]
 561-822-2045
  

Review Stop PW PUBLIC WORKS
Rev No 1 Status F Date 12-10-2020 Cont ID  
Sent By   Date 12-10-2020 Time   Rev Time  
Received By   Date 12-10-2020 Time   Sent To  
Notes
2020-12-10 12:25:19PLEASE PROVIDE :
 1-LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID
 WASTE VOLUME PRODUCED ALONG WITH THE SIZE AND TYPE OF
 THE CONTAINER (I.E. DUMPSTER/COMPACTOR) THAT WILL BE
 UTILIZED THAT WILL BE UTILIZED FOR THE SANITATION
 SERVICE.
 2- DETAILS FOR SANITATION SERVICE.
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045
  

Review Stop STORM STORMWATER
Rev No 3 Status P Date 08-25-2021 Cont ID  
Sent By tward Date 08-25-2021 Time 11:21 Rev Time 0.00
Received By tward Date 08-25-2021 Time 11:25 Sent To  
Notes
2021-08-25 11:24:54THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 8/10/2021 SUBMITTAL.
  
 1. FOR ENGINEERING PERMIT SUBMITTAL, INCLUDE DETAILS OF
 THE SOIL TRACKING DEVICE AND OF THE SLOTTED TRENCH
 DRAIN.
  
 TRACY WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120 (O)
 561-351-0510 (M)
  

Review Stop STORM STORMWATER
Rev No 2 Status F Date 03-11-2021 Cont ID  
Sent By tward Date 03-11-2021 Time 06:18 Rev Time 0.00
Received By tward Date 03-11-2021 Time 06:18 Sent To  
Notes
2021-03-11 06:17:56THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 2/12/2021 SUBMITTAL:
 1. SHOW EXISTING UTILITY POLES ON SHEET C-3.
  
 2. MOVE THE STORMWATER MANHOLE AT THE EAST END OF THE
 EXFILTRATION TRENCH (OR ENTIRE EXFILTRATION SYSTEM) TO
 THE WEST AWAY FROM THE UTILITY POLE.
  
 3. HIGH LIGHT ON THE CIVIL PLANS (THROUGH COLOR) WHERE
 THE RAILROAD TRACK WILL BE LOCATED (WILL REMAIN). THE
 SITE PLAN SHOWS SEVERAL PLANTING AREAS OVER THE TRACKS.
  
 5. LABEL THE VERTICAL DATUM ON ALL SHEETS THAT CONTAIN
 ELEVATION INFORMATION (SHEETS C-2, C-3, C-5, C-7)
  
 6. PROVIDE THE WIDTH OF THE EXFILTRATION TRENCH ON THE
 EXFILTRATION TRENCH DETAIL ON SHEET C-7.
  
 TRACY WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120 (O)
 561-351-0510 (M)
  

Review Stop STORM STORMWATER
Rev No 1 Status F Date 12-10-2020 Cont ID  
Sent By tward Date 12-10-2020 Time 10:58 Rev Time 0.00
Received By tward Date 12-10-2020 Time 10:59 Sent To  
Notes
2020-12-10 10:58:58THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. LABEL VERTICAL DATUM ON SHEET C-7.
  
 2. CONSIDER THE USE OF PERVIOUS PAVERS AND PERVIOUS
 CONCRETE TO REDUCE THE AMOUNT OF STORMWATER RUNOFF.
  
 3. FOR SECTION A-A ON SHEET C-5, INCLUDE A SWALE IN THE
 5' LANDSCAPE STRIP ON THE LEFT SIDE OR INSTALL THE
 TRENCH DRAIN LOWER THAN THE NORTH PROPERTY LINE TO
 PREVENT DIRECT RUNOFF TO THE PROPERTY TO THE NORTH.
  
 4. CONFIRM MAINTENANCE EQUIPMENT WILL BE ABLE TO ACCESS
 THE DRAINAGE STRUCTURES FOR CLEANING POST CONSTRUCTION.
  
 5. SHOW THE EXISTING RAILS ON SECTION A-A ON SHEET C-5
 AND HOW STORMWATER RUNOFF WILL REACH THE DRAINAGE
 SYSTEM.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. A SFWMD ERP MAY BE REQUIRED. PROVIDE A COPY OF THE
 PERMIT PRIOR TO STARTING CONSTRUCTION.
  
 4. PROVIDE A COPY OF THE DRAINAGE CALCULATIONS WITH THE
 ENGINEERING PERMIT APPLICATION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  

Review Stop SURVEY SURVEYING
Rev No 3 Status P Date 09-02-2021 Cont ID  
Sent By vnoel Date 09-02-2021 Time 07:49 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
2021-09-02 07:50:25CONDITION OF APPROVAL:
  
 1. ART STRUCTURE MUST BE REVIEWED BY ENGINEERING AND
 PUBLIC UTILITIES PRIOR TO ACCEPTANCE.

Review Stop SURVEY SURVEYING
Rev No 2 Status F Date 02-25-2021 Cont ID  
Sent By vnoel Date 02-25-2021 Time 15:14 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
2021-02-25 15:24:061. NO SURVEY IN RESUBMITTAL PACKAGE.
 2. SHOW ALL EXISTING AND PROPOSED UTILITIES ON ALL
 PLANS.
 3. COMMENT #26 AND #45 ARE CONTRADICTORY AS TO HOW THE
 ART STRUCTURE IS ATTACHED.

Review Stop SURVEY SURVEYING
Rev No 1 Status F Date 12-07-2020 Cont ID  
Sent By vnoel Date 12-07-2020 Time 08:08 Rev Time  
Received By vnoel Date   Time   Sent To  
Notes
2020-12-07 08:24:151. NO SURVEY PROVIDED.
 2. COORDINATE LOCATION OF PROPOSED FPL TRANSFORMER IN
 NW CORNER..
 3. PROPOSED TRAIN CART MAY CONFLICT WITH PROPOSED
 MAINTENANCE OF WATER MAIN AND SERVICES.

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status F Date 12-10-2020 Cont ID  
Sent By   Date 12-10-2020 Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
2020-12-10 12:19:04TRAFFIC COMMENTS:
 1. PLEASE CONFIRM THAT THE CABLE CAR IS MOVEABLE ALONG
 THE TRACKS, AS TO PERMIT ACCESS TO UTILITIES BENEATH IT
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop Z ZONING
Rev No 4 Status P Date 10-22-2021 Cont ID  
Sent By ckimmerl Date 10-22-2021 Time 09:29 Rev Time 0.00
Received By ckimmerl Date 10-22-2021 Time 09:29 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status F Date 08-30-2021 Cont ID  
Sent By ckimmerl Date 08-30-2021 Time 14:02 Rev Time 0.00
Received By ckimmerl Date 08-30-2021 Time 13:56 Sent To  
Notes
2021-08-30 14:01:41REGARDING THE PROPOSED CONCRETE BENCHES, UTILITY
 COMMENTS NOTE THAT SEVERAL PROPOSED BENCHES CONFLICT
 WITH EXISTING FORCE MAIN AND SEWER LINES. THE BENCHES
 WOULD NEED TO BE MOVED BACK TO THE GREATEST EXTENT
 POSSIBLE (MIN. 2 FEET) FROM THESE UTILITY LINES TO
 PROVIDE ACCESS AND CLEARANCE NECESSARY FOR MAINTENANCE.
 PLEASE SPECIFY IF THE BENCHES PROPOSED CAN BE MOVED BY
 HEAVY MACHINERY, IF NOT, MAY NEED TO PROVIDE
 ALTERNATIVE LIGHTER MATERIAL OR BENCH DESIGNS.

Review Stop Z ZONING
Rev No 2 Status F Date 03-02-2021 Cont ID  
Sent By elevesqu Date 03-02-2021 Time 15:43 Rev Time 0.00
Received By elevesqu Date 03-02-2021 Time 15:43 Sent To  
Notes
2021-03-02 15:44:14GENERAL:
 1. NOT SATISFIED. PLEASE COORDINATE WITH CITY
 ENGINEERING ON THE DESIGN OF TAMARIND AVENUE AS THE
 CONSTRUCTION OF FLAGLER STATION AND THE LINEAR PARK
 PROGRESSES
 PLEASE INCLUDE TAMARIND AVENUE PLANS THAT HAVE BEEN
 FINALIZED BY CITY ENGINEERING DEPT.
 2. SATISFIED.
 3. NOTED, SATISFIED.
 4. SATISFIED. STAFF RECOMMENDS HAVING A DISCUSSION WITH
 CRA, ZONING STAFF AND THE CITY LANDSCAPE PLANNER TO
 DISCUSS THE FOLLOWING DESIGN ITEMS:
 A. SATISFIED.
 B. SATISFIED.
 C. SATISFIED.
 D. SATISFIED.
 E. SATISFIED.
 F. SATISFIED.
 G. SATISFIED.
 H. SATISFIED.
 5. ONGOING. THE PROPOSED GHOST TRAIN MAY BE IN CONFLICT
 WITH AN EXISTING FORCE MAIN. PLEASE INCLUDE PROPOSED
 DIMENSIONS OF STRUCTURE IF KNOWN OR ESTIMATED
 DIMENSIONS. CAN THIS BE SHIFTED FURTHER WEST TO AVOID
 CONFLICTS?
 THE LATEST ITERATIONS OF THE AIPP CONCEPT THAT PLANNING
 STAFF HAS SEEN DID NOT INCLUDE ANY OPTION FOR MOBILE
 RELOCATION. THIS SHALL BE AN ONGOING DISCUSSION BETWEEN
 PLANNING, ENGINEERING, CRA AND PUBLIC WORKS AS THE AIPP
 CONCEPT IS REVISED
 6. SATISFIED.
 7. NOT SATISFIED. PLEASE INDICATE LOCATION OF PRESERVED
 RAIL TRANSFER PIECE (FOUND ON SITE SEPARATE FROM
 TRACKS)
 HISTORIC AND PLANNING STAFF WOULD LIKE TO KEEP THIS
 RAIL TRANSFER PIECE AS PART OF THE PRESERVATION OF THE
 LINEAR PARK. THIS PIECE COULD BE INCLUDED IN THE AIPP
 (SUGGESTION ONLY, NEED TO WORK WITH AIPP) OR STOOD UP
 INTO PLANTER BED OR LAID INTO GROUND WITHIN PARK. THESE
 ARE ONLY SUGGESTIONS. PLEASE HAVE DISCUSSIONS WITH
 AIPP, CRA AND PLANNING
 LANDSCAPE:
 1. SATISFIED.
 2. CONDITION OF APPROVAL: PLEASE RETAIN LANDSCAPE
 SCREENING AROUND FLAGLER STATION?S UTILITIES AS
 PROPOSED WITH THE PARENT SITE (TO BEST EXTENT
 POSSIBLE). IS A BENCH PROPOSED IN FRONT OF THIS AREA?
 PLEASE CLARIFY, THIS WOULD NOT BE A GOOD LOCATION FOR A
 BENCH DUE TO THE UTILITIES
 3. PLEASE DISTINGUISH BETWEEN PROPOSED BENCHES FROM
 EDGE OF PAVERS THROUGH LABELING OR OTHER MEANS
 4. PARTIALLY SATISFIED. PLEASE CONFIRM WITH RAY CARANCI
 IF SABAL PALMS NUMBER 53, 54, 62, 67 AND 68 SHOULD BE
 PRESERVED ON SITE OR BETTER TO BE RELOCATED (OR
 MITIGATED)
 PLEASE SEE LANDSCAPE COMMENTS
  
  
 CIVIL:
 1. SATISFIED.
 2. SATISFIED.
  
  
 LIZ LEVESQUE, URBAN DESIGN PLANNER
 561 822 1426
 [email protected]

Review Stop Z ZONING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By elevesqu Date 02-12-2021 Time 16:27 Sent To  
Notes
2021-02-12 16:27:46GENERAL:
 1. PLEASE COORDINATE WITH CITY ENGINEERING ON THE
 DESIGN OF TAMARIND AVENUE AS THE CONSTRUCTION OF
 FLAGLER STATION AND THE LINEAR PARK PROGRESSES
 2. PLEASE COORDINATE WITH CITY ENGINEERING AND CGA
 SOLUTIONS REGARDING THE PROPOSED FPL TRANSFORMER THAT
 HAS BEEN PROPOSED ALONG THIS PORTION OF TAMARIND AS
 PART OF THE UNDERGROUNDING PROCESS. THIS WILL NEED TO
 BE EVALUATED FOR IMPACTS TO THE LINEAR PARK DESIGN
 3. STAFF RECOMMENDS HAVING A DISCUSSION WITH CRA,
 ZONING STAFF AND THE CITY LANDSCAPE PLANNER TO DISCUSS
 THE FOLLOWING DESIGN ITEMS:
 A. TYPES OF LIGHT POLES OR LIGHTING THROUGHOUT THE
 PARK. THIS WILL NEED TO BE LIT FOR SECURITY PURPOSES TO
 MEET CPTED REQUIREMENTS
 B. LINEAR BENCH DESIGN AND LOCATION
 C. EVALUATE IF TREES WOULD BE BETTER AROUND EDGES OF
 LINEAR PARK RATHER THAN WITHIN THE TRACKS AND KEEP
 TRACKS MORE OPEN WITH LOWER LANDSCAPE MATERIAL WITHIN
 TRACKS
 D. REDUCING THE AMOUNT OF HARDSCAPE MATERIAL
 SURROUNDING THE PROPOSED GHOST TRAIN AND EAST SIDE OF
 LINEAR PARK AND FOCUSING MORE LANDSCAPE INTO THE DESIGN
 E. THE PRESERVATION OR REMOVAL OF THE EXISTING
 LANDSCAPE BEHIND THE LAW OFFICE AT THE PROJECT?S
 NORTHWEST CORNER (922 2ND STREET)
 F. ALTERNATIVE METHODS OF STORMWATER DRAINAGE OTHER
 THAN TRENCH DRAIN ALONG THE ENTIRE NORTH FA?ADE
 G. IS THERE ANY CONCEPT FOR A FENCE ALONG THE NORTH
 PART OF THE LINEAR PARK OR WILL THIS BE ACCESSIBLE
 THROUGH THE BACK OF ALL PROPERTIES?
 H. PLEASE SUBMIT APPROVAL FROM WPB CRA FOR ANY
 RESUBMITTAL REFERENCING PLAN DATES
 4. THE PROPOSED GHOST TRAIN MAY BE IN CONFLICT WITH AN
 EXISTING FORCE MAIN. PLEASE INCLUDE PROPOSED DIMENSIONS
 OF STRUCTURE IF KNOWN OR ESTIMATED DIMENSIONS. CAN THIS
 BE SHIFTED FURTHER WEST TO AVOID CONFLICTS?
 5. PLEASE DETERMINE WHICH RAIL TIES WILL BE PRESERVED
 AND INDICATE ON PLANS
 6. PLEASE INDICATE LOCATION OF PRESERVED RAIL TRANSFER
 PIECE (FOUND ON SITE SEPARATE FROM TRACKS)
 LANDSCAPE:
 7. PLEASE INCLUDE A LARGER TREE TYPE WITHIN THE PLANTER
 BED AT THE LINEAR PARK?S EASTERN EDGE
 8. PLEASE RETAIN LANDSCAPE SCREENING AROUND FLAGLER
 STATION?S UTILITIES AS PROPOSED WITH THE PARENT SITE
 (TO BEST EXTENT POSSIBLE). IS A BENCH PROPOSED IN FRONT
 OF THIS AREA? PLEASE CLARIFY, THIS WOULD NOT BE A GOOD
 LOCATION FOR A BENCH DUE TO THE UTILITIES
 9. PLEASE DISTINGUISH BETWEEN PROPOSED BENCHES FROM
 EDGE OF PAVERS THROUGH LABELING OR OTHER MEANS
 10. PLEASE CONFIRM WITH RAY CARANCI IF SABAL PALMS
 NUMBER 53, 54, 62, 67 AND 68 SHOULD BE PRESERVED ON
 SITE OR BETTER TO BE RELOCATED (OR MITIGATED)
  
  
 CIVIL:
 11. ALTERNATIVE METHODS OF STORMWATER DRAINAGE OTHER
 THAN TRENCH DRAIN ALONG THE ENTIRE NORTH FA?ADE. PLEASE
 EVALUATE IF DRAINAGE CAN BE INVERTED INTO CENTER TRACK
 AREA (MAJORITY LANDSCAPE MAY BE HERE)
 12. WHY IS A TRENCH DRAIN NECESSARY FOR THIS LINEAR
 PARK?
  
 LIZ LEVESQUE, URBAN DESIGN PLANNER
 561 822 1426
 [email protected]

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved