Plan Review Details - Project Z20080008
Plan Review Stops For Project Z20080008
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 09-09-2020 Cont ID  
Sent By elevesqu Date 09-09-2020 Time 20:23 Rev Time 0.00
Received By rbrown Date 09-09-2020 Time 20:22 Sent To  
Notes
2020-09-09 20:30:55DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR THE BUILDING PERMIT APPLICATION.
  
 2. NUMBER OF ACCESSIBLE PARKING SPACES. THE VEHICULAR
 PARKING TABLE ON SITE AND ZONING DATA SHEET A 0.01 DOES
 NOT STATE HOW MANY ACCESSIBLE PARKING SPACES AND VAN
 ACCESSIBLE PARKING SPACES ARE BEING PROVIDED RELATIVE
 TO THE TOTAL NUMBER OF PARKING SPACES PROPOSED. WHEN
 SUBMITTED FOR PERMIT THE PLANS SHALL CLEARLY SHOW THAT
 THE MINIMUM NUMBER OF ACCESSIBLE PARKING SPACES
 PROVIDED IS IN ACCORDANCE WITH THE FAIR HOUSING ACT AND
 SECTION 208.2 OF FLORIDA ACCESSIBILITY CODE.
  
 3. VAN ACCESSIBLE PARKING SPACES. PER SECTION 208.2.4
 OF FLORIDA ACCESSIBILITY CODE, ONE IN EVERY SIX
 REQUIRED ACCESSIBLE SPACES (AT LEAST ONE) IN A PARKING
 STRUCTURE, SHALL BE ?VAN ACCESSIBLE? AND DESIGNED IN
 ACCORDANCE WITH SECTION OF 502 OF FLORIDA ACCESSIBILITY
 CODE (VERTICAL CLEARANCE NOT LESS THAN 98 INCHES AT
 SPACE AND VEHICULAR ACCESS ROUTE)
  
 4. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT,
 THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR
 THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT,
 AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE
 FLORIDA BUILDING CODE.
  
 5. BUILDING LOCATION RELATIVE TO THE PROPERTY LINE AND
 OTHER STRUCTURES. WHEN SUBMITTED FOR BUILDING PERMIT,
 COMPLIANCE WITH ALL BUILDING SEPARATION, PERCENTAGE OF
 OPENINGS AND OPENING PROTECTIVE REQUIREMENTS OF
 CHAPTERS 6 AND 7 OF THE FLORIDA BUILDING CODE SHALL BE
 VERIFIED.
  
 6. ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE DOES
 NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL OPENINGS TO
 MEET THE DEFINITION OF AN OPEN PARKING GARAGE, IT WILL
 BE CONSIDERED AN ENCLOSED PARKING GARAGE AND MUST HAVE
 EXHAUST SYSTEMS. THE EXHAUST SYSTEMS SHALL BE DESIGNED
 TO MINIMIZE NOISE LEVELS USING INLINE FAN SILENCERS OR
 OTHER APPROVED METHODS.
  
 7. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS,
 GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND
 OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS,
 SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC.
  
 8. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND
 CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF
 CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL
 NEIGHBORING PROPERTIES.
  
 9. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER
 AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY,
 INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE
 CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF
 NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION
 THAT MAY AFFECT THE USE OF THEIR PROPERTY.
  
 10. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT
 WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL
 HAVE A SEPARATE ADDRESS ASSIGNED BASED ON THE LOCATION
 OF THE BUILDING ENTRANCE. FOR STREET ADDRESSING,
 CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT
 (561) 805 6659, OR BY EMAIL: [email protected]
  
 11. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT
 TO ART IN PUBLIC PLACES (AIPP) ASSESSMENT. FOR ADVICE
 ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP
 ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC
 PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL:
 [email protected]
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 4 Status P Date 04-02-2021 Cont ID  
Sent By rrossano Date 04-02-2021 Time   Rev Time 0.00
Received By rrossano Date 04-02-2021 Time   Sent To  
Notes
***NONE***

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 3 Status F Date 03-08-2021 Cont ID  
Sent By rrossano Date 03-08-2021 Time   Rev Time 0.00
Received By rrossano Date 03-08-2021 Time   Sent To  
Notes
2021-03-08 14:39:53COMMENTS PER MARK HURLEY, CUSTOMER SERVICE FIELD SUPV.,
 WPB PUBLIC UTILITIES, 561-822-2262, [email protected] :
  
 -WATER PLAN SHOWS A LARGE OVAL GROUND DEPRESSION NEAR
 THE SOUTHEAST CORNER OF THE PROPOSED BUILDING NEAR THE
 WATER METERS AND BACKFLOW ASSEMBLIES. PLEASE VERIFY IF
 AREA WILL REMAIN LIKE THAT, OR IF GROUND ELEVATION WILL
 INCREASE CLOSER TO THAT OF SURROUNDING AREA. (IF NOT,
 CHANGES TO BACKFLOW ASSEMBLIES AND DOMESTIC METER
 SERVICE, OR GROUND GRADE MAY BE NEEDED.)
 -THERE ARE DUPLICATE WATER SERVICE STANDARD DETAILS FOR
 THE ABOVE-GROUND METER SERVICE AND SMALL BACKFLOW
 ASSEMBLY. PLEASE REMOVE APR 2018 AND NOV 2018
 RESPECTIVELY.
 -FOR FORMAL ENGINEERING SUBMITTAL, MAKE SURE IRRIGATION
 METER BOX IS DISTANCED AT LEAST THREE FEET FROM
 ADJACENT LARGE POLE. SHOW/CALLOUT DISTANCE OR ADD NOTE
 ON LABEL FOR IRRIGATION METER. (IF IRRIGATION BOX IS
 ADJUSTED SOUTH, THEN FIRELINE MAY NEED ADJUSTMENT SOUTH
 AS WELL.)
 -PLEASE VERIFY THERE IS NO GATE OR FENCE BETWEEN
 SIDEWALK AND PROPOSED METERS/BACKFLOWS.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT, 561-494-1098, [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 2 Status F Date 10-28-2020 Cont ID  
Sent By rrossano Date 10-28-2020 Time   Rev Time 0.00
Received By rrossano Date 10-28-2020 Time   Sent To  
Notes
2020-10-28 15:17:35COMMENTS PER RICK ROSSANO:
 1. ADD ADDRESS TO COVER SHEET.
 2. PROVIDE SWPPP FOR ENGINEERING SUBMITTAL SPECIFYING
 STORM INLET PROTECTION ONSITE AND ALONG ENTIRE FRONTAGE
 OF PROJECT.
  
 SHEET C-08:
 1. ADD NOTE TO REMOVE 8 IN. SANITARY TO BE ABANDONED.
 2. ADD NAVD/NGVD CONVERSION NOTE.
  
 SHEET C-10:
 1. UPDATE SANITARY SEWER STANDARD DETAILS TO MOST
 CURRENT VERSIONS; EMAIL [email protected] FOR PDF
 VERSIONS OR [email protected] FOR CAD VERSIONS.
 2. FOR MANHOLES IN RIGHT OF WAY, PROVIDE 5 FT. MIN.
 INTERNAL DIAMETER.
  
 COMMENTS PER MARK HURLEY:
  
 -NEED UPDATE DEMO PLAN C-03 LABELS TO REFLECT THAT
 EXISTING WATER SERVICES AND BACKFLOW ASSEMBLIES FOR
 PHASE ONE ARE NOT BEING RELOCATED OR CHANGED UNTIL
 DOWNSTREAM OF THE BACKFLOW ASSEMBLIES, AS INDICATED IN
 PRIOR COMMENT RESPONSES.
  
 -ON UTILITY PLAN C-08, RELOCATE GATE VALVES FOR NEW
 WATER SERVICES OUT OF THE SIDEWALK.
  
 -PROPOSED DOMESTIC 6 INCH METER IS STILL TOO FAR FROM
 THE PROPERTY LINE. POSSIBLE SOLUTION MAY BE TO RELOCATE
 FIRE AND IRRIGATION WATER SERVICES SOUTH OF THE GUY
 ANCHOR EASEMENT, AND RELOCATE THE DOMESTIC METER EAST
 (STILL NORTH OF THE GUY ANCHOR EASEMENT).
  
 -FOR FORMAL ENGINEERING SUBMITTAL, ADD LABELS TO THE
 CITY WATER SERVICE PIPING SHOWING PIPE SIZE AND
 MATERIAL TYPE USED. ALSO ADD LABELS ON THE REROUTED
 PRIVATE PIPING FOR THE EXISTING WATER SERVICES THAT
 SHOW PIPE MATERIAL FOR THE FIRE AND IRRIGATION LINES.
  
 -FOR FORMAL ENGINEERING SUBMITTAL, UPDATE LABELS FOR
 IRRIGATION METER AND BACKFLOW ASSEMBLY TO REFERENCE
 WS-1 AND WS-6 RESPECTIVELY.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT, 561-494-1098, [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status F Date 09-03-2020 Cont ID  
Sent By rrossano Date 09-03-2020 Time   Rev Time  
Received By rrossano Date 09-03-2020 Time   Sent To  
Notes
2020-09-03 17:24:46FOLLOWING COMMENTS FROM RICK ROSSANO, PROJECT
 COORDINATOR, ENGINEERING SERVICES DEPARTMENT,
 561-494-1098, [email protected] :
  
 1. THE CITY OF WEST PALM BEACH HAS A NUMBER OF
 REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY
 AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND
 WASTEWATER UTILITIES WITHIN THE CITY. PLEASE SEE
 DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AT THE LINK
 BELOW: HTTP://WPB.ORG/CMSPAGES/GETAMAZONFILE.ASPX?PATH=
 ~\WPB_WEBSITE\MEDIA\ENGINEERING\DEVELOPMENT-APPLICATION
 -FULL-PACKAGE_2016.PDF&HASH=7BD4DD7EB6115181D8C5977BCC0
 2A97B1960045731D3658206F27451722716EF
 THIS AND OTHER RELATED ENGINEERING DOCUMENTS CAN BE
 FOUND HERE: HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBL
 IC-WORKS/FORMS,-PERMITS-APPLICATIONS
 2. CODE OF ORDINANCES, CITY OF WEST PALM BEACH,
 FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, ADOPTED
 SEPT. 22, 2008. (SUPPLEMENT NO. 18)
 CHAPTER 90 UTILITIES, ARTICLE I. SEC. 90-7.
 POLICY REGARDING EXTENSION OF WATER OR SEWER SERVICE
 FACILITIES OF THE CITY.
 THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE
 CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY
 BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS,
 BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION.
 3. AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR
 MORE INFORMATION, REFER TO THE LINK BELOW:
 HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI
 CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
 4. PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY
 OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC
 RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF
 YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE
 MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL
 IN THE WPB ENGINEERING SERVICES DEPARTMENT AT
 [email protected] OR 561-494-1040 FOR FURTHER
 ASSISTANCE.
 5. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS
 OF ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES,
 INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND
 SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES,
 METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE
 SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING
 GRADES, PIPES SIZES, MATERIALS, ELEVATIONS,
 ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL
 INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER
 LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE
 PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN
 VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS.
 PLEASE SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL
 EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT,
 INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES LOCATED ON THE
 RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL
 UTILITY CROSSINGS.
 6. CUT AND CAP UTILITIES NOT IN USE, AND REMOVE ANY
 ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY
 ROW.
 7. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE
 DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB
 DEVELOPMENT APPLICATION).
 8. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM
 AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE
 PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER.
 9. SHOW VERTICAL DATUM AND DATUM CONVERSION INFORMATION
 (NAVD 88 AND NGVD 29).
 10. PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND
 STORMWATER FACILITIES ALONG ENTIRE PROJECT FRONTAGE.
 11. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND
 IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED
 AREAS.
 12. PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR
 PROPOSED SANITARY LATERALS.
 13. PLEASE LABEL WATER LINES AS PRIVATE WHERE
 APPLICABLE.
 14. PLEASE PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED
 LOCATION OF WATER METER AND BACKFLOW PREVENTION; CALL
 OUT HORIZONTAL SEPARATION OF PROPOSED WATER FROM
 EXISTING 8 IN. SANITARY LINE.
 15. PROPOSED DOMESTIC WATER TAP SHOWN CONNECTING TO
 EXISTING 8 IN. SANITARY LINE; PLEASE CORRECT.
 16. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING
 PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT
 HIM AT 561-494-2262 OR [email protected]
 17. PROVIDE DEDICATED UTILITY EASEMENTS TO ALLOW ACCESS
 FOR CITY PERSONNEL TO PROPOSED UTILITY WATER METERS.
  
  
  
 THE FOLLOWING COMMENTS ARE FROM HONG XU, PROJECT
 ENGINEER, CITY OF WPB PUBLIC UTILITIES, 561-494-1047,
 [email protected] :
  
 PLEASE CLARIFY IF 6 INCH POTABLE WATER SERVICE, 8 INCH
 DIP FIRE SERVICE AND 3 INCH IRRIGATION SERVICE ARE
 EXISTING OR PROPOSED. HOW DO THEY CONNECT TO EXISTING
 ONES?
  
 ARE THERE PROPOSED SEWER LATERALS CONNECTING TO
 EXISTING 8 INCH VCP SANITARY SEWER MAIN FROM THE
 PROPOSED BUILDING?
  
 ARE THERE ANY DRY UTILITIES THE AREA?
  
 PLEASE PROVIDE THE LEVEL OF SERVICE CALCULATION.
  
 THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD
 CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES:
  
 -IS THE EXISTING PHASE ONE PROPERTY ADDRESS 350 S.
 AUSTRALIAN OR 300 S. AUSTRALIAN? EXISTING WATER
 SERVICES SHOW UP AS 300 S. AUSTRALIAN AVE IN UTILITY
 BILLING SYSTEM. PLEASE ALSO VERIFY ADDRESS OF PHASE TWO
 CONSTRUCTION.
  
 -IT APPEARS THERE ARE AT LEAST TWO EXISTING FIRE
 HYDRANTS ON WEST SIDE OF OPEN SPACE DOWNSTREAM OF
 EXISTING DCDA FIRELINE. WILL THOSE REMAIN IN SAME SPOT
 OR BE RELOCATED NEARBY?
  
 -EXISTING FIRE DCDA NEEDS TO REMAIN ADJACENT CLEARWATER
 DR. NEAR THE EASTERN PROPERTY LINE. ON FORMAL
 ENGINEERING SUBMITTAL PLEASE LABEL POINT OF SERVICE
 GATE VALVE.
  
 -EXISTING 6? DOMESTIC METER NEEDS TO BE INSTALLED
 ABOVE-GROUND WHEN RELOCATED WITHOUT A LARGE VAULT PER
 CONSTRUCTION STANDARD DETAILS. DO NOT REUSE WATER
 SERVICE COMPONENTS SUCH AS FITTINGS, BOXES, LIDS,
 VALVES, AND PIPING ? REPLACE THEM. PLAN THE WORK TO
 MINIMIZE WATER SERVICE OUTAGES FOR CUSTOMERS.
  
 -KEEP WATER METER BOX, BACKFLOW ASSEMBLIES, AND VALVE
 BOXES OUT OF SIDEWALKS AND PEDESTRIAN FOOT TRAFFIC.
  
 -RELOCATED BACKFLOW ASSEMBLIES WILL BE SUBJECT TO
 BACKFLOW INSTALLATION INSPECTIONS. ANY BACKFLOW
 ASSEMBLIES THAT ARE NOT LEAD-FREE COMPLIANT OR USC
 APPROVED WILL NEED TO BE REPLACED WITH COMPLIANT
 ASSEMBLIES.
  
 -EXISTING IRRIGATION METER IS 2?. IF NOT SUFFICIENT,
 MAY NEED TO UPSIZE OR ADD ADDITIONAL WATER SERVICE.
  
 -WATER SERVICES AND METERS (EXISTING OR PROPOSED) ON
 PRIVATE PROPERTY WILL REQUIRE UTILITY EASEMENT IF NOT
 EXISTING ALREADY. BACKFLOW ASSEMBLIES CANNOT BE IN
 UTILITY EASEMENTS.
  
 -NEED MORE INFORMATION ON LOCATION OF PROPOSED NEW
 WATER SERVICES AND BACKFLOW ASSEMBLIES. IS THAT
 LOCATION A GRASSY AREA WHERE THERE IS NO INTENTION OF
 PEDESTRIAN OR VEHICLE TRAFFIC? THEY CANNOT BE LOCATED
 IN ROADWAYS OR SIDEWALKS.
  
 -EXISTING FIRE HYDRANT NEAR SE CORNER OF PROPERTY
 APPEARS TO BE LEFT OFF OF UTILITY PLAN. PLEASE ADD AND
 LABEL.
  
 -PROPOSED DOMESTIC AND IRRIGATION WATER SERVICES WITH
 METERS 3? AND LARGER SHOULD BE ABOVE-GROUND
 INSTALLATION USING SD WS-3.
  
 -PLEASE RELOCATE PROPOSED WATER SERVICE PIPING SO THAT
 IT DOES NOT RUN UNDERNEATH AND CLOSE TO FPL/AT&T
 UTILITIES AND GUY WIRES. BUILDING STRUCTURE OR LOCATION
 MAY NEED REDESIGN/ALTERATION TO FACILITATE THIS. ALSO
 RELOCATE PROPOSED METERS CLOSER TO EASTERN PROPERTY
 LINE SO THEY ARE WITHIN REACH OF CRANETRUCK OR BACKHOE,
 AND PIPE DISTANCE TO WATER MAIN IS MINIMIZED.
  
 -VERIFY PROPOSED 8? DCDA LOCATION IS ACCEPTABLE WITH
 CITY WPB FIRE MARSHAL.
  
 -SOME PARTS OF THE PROPERTY LIMITS APPEAR TO BE LEFT
 OFF OF THE UTILITY PLANS. PLEASE ADD THOSE AREAS TO THE
 PLANS USING MATCH-LINES AND EXTRA SHEETS IF NECESSARY.
  
 -FOR FORMAL ENGINEERING SUBMITTAL ADD ENLARGED/ZOOMED
 AREA OF THE METERED WATER SERVICES AND BACKFLOW
 ASSEMBLIES.
  
 -WPB UTILITIES RECOMMENDS PARALLEL/DUAL BACKFLOW
 ASSEMBLIES ON LARGE DOMESTIC WATER SERVICES TO MINIMIZE
 WATER OUTAGES DURING BACKFLOW ASSEMBLY MAINTENANCE.
  
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 4 Status P Date 03-31-2021 Cont ID  
Sent By pleduc Date 03-31-2021 Time 14:39 Rev Time 0.00
Received By pleduc Date 03-31-2021 Time 14:38 Sent To  
Notes
2021-03-31 14:39:24FIRE HAS NO OBJECTIONS AND APPROVES.
  
 FIRE'S APPROVAL OF THIS SUBMITTED PROJECT DOES NOT
 CONSTITUTE ITS FINAL REVIEW OR APPROVAL.
  
 FIRE SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT THE
 APPROPRIATE TIME AND IN ACCORDANCE WITH THE
 REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 03-05-2021 Cont ID  
Sent By pleduc Date 03-05-2021 Time 13:33 Rev Time 0.00
Received By pleduc Date 03-05-2021 Time 13:32 Sent To  
Notes
2021-03-05 13:33:07FIRE HAS NO OBJECTIONS AND APPROVES.
  
 FIRE'S APPROVAL OF THIS SUBMITTED PROJECT DOES NOT
 CONSTITUTE ITS FINAL REVIEW OR APPROVAL.
  
 FIRE SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT THE
 APPROPRIATE TIME AND IN ACCORDANCE WITH THE
 REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status F Date 11-04-2020 Cont ID  
Sent By pleduc Date 11-04-2020 Time 09:47 Rev Time 0.00
Received By pleduc Date 11-04-2020 Time 09:44 Sent To  
Notes
2020-11-04 09:52:44THOUGH FIRE HAS NO OBJECTION TO THE PROPOSED AND HAS
 PASSED THE REVIEW, THE RESPONSES TO THE FIRE COMMENTS
 ARE VAGUE AND GENERAL.
  
 FIRE AND ZONING STAFF IS REQUESTING GREATER DETAIL FOR
 THE FDC, DDCV FIRE LINE, FIRE HYDRANTS, AND LOCATION OF
 COMMAND ROOM. ADDITIONALLY, THE OCCUPANCY FOR THE POOL
 DECK, AND SEPARATION DISTANCE OF STAIRWELLS COULD HAVE
 MAJOR IMPACTS TO THE DESIGN OF THE STRUCTURE DURING
 BUILDING PERMIT.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 09-09-2020 Cont ID  
Sent By pleduc Date 09-09-2020 Time   Rev Time 0.00
Received By pleduc Date 09-09-2020 Time 08:55 Sent To  
Notes
2020-09-09 09:34:00THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC,
 FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM
 BEACH FIRE RESCUE.
  
 THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE
 DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE.
 ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS
 ARE SUBMITTED FOR PERMIT.
  
 THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE
 PROPOSED PROJECT.
  
 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY
 WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE
 PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A
 PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED
 TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN
 STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY
 MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER
 PROTECTION.
  
 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY
 IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING
 ALL CONSTRUCTION ACTIVITIES.
  
 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM
 ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION.
 ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND
 AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT
 WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS.
  
 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE
 REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE
 ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS.
  
 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH
 THE 6TH EDITION OF THE FLORIDA FIRE PREVENTION CODE,
 INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES.
  
 6. ALL PARKING STRUCTURES SHALL COMPLY WITH NFPA 88A,
 PARKING STRUCTURES AND NFPA 101, THE LIFE SAFETY CODE,
 INCLUDING MORE SPECIFICALLY, CHAPTER 42 STORAGE
 OCCUPANCIES (PARKING STRUCTURES)
  
 7. A NFPA 13 COMPLAINT FIRE SPRINKLER SYSTEM AND NFPA
 14 COMPLIANT WET STANDPIPE SYSTEM ARE REQUIRED FOR THIS
 STRUCTURE. TEMPORARY STANDPIPES ARE REQUIRED WHEN THE
 BUILDING REACHES THREE LEVELS OR THIRTY FEET WHILE
 BEING CONSTRUCTED. SEPARATE SHOP DRAWINGS, ARE REQUIRED
 TO BE SUBMITTED, REVIEWED AND APPROVED BY THE FIRE
 PREVENTION BUREAU PRIOR TO ANY INSTALLATION.
  
 A FDC LOCATION COULD NOT BE EASILY IDENTIFIED ON THE
 CIVIL SITE PLAN. IT IS RECOMMENDED THAT HIGH RISES HAVE
 TWO SEPARATE FDC LOCATED REMOTELY FOR EACH OTHER. ONE
 FDC IS RECOMMENDED ON CLEARWATER NEAR THE SOUTH END
 PARKING GARAGE ACCESS AND THE OTHER ALONG THE NORTH
 ACCESS ROAD IN THE AREA OF THE FIRE COMMAND ROOM. CLOSE
 COORDINATION WITH THE OFFICE OF THE FIRE MARSHAL IS
 ENCOURAGED.
  
 7A. PER NFPA 14
  
 6.4.5.4* FIRE DEPARTMENT CONNECTIONS SHALL BE LOCATED
 NOT MORE THAN 100 FT (30.5 M) FROM THE NEAREST FIRE
 HYDRANT CONNECTED TO AN APPROVED WATER SUPPLY.
  
 7B. PLEASE REVIEW THE DISTANCE SEPARATION OF THE
 STAIRWELLS AS THE SEPARATION DISTANCE IS NOT INDICATED.
  
 7.3.2.2* WHERE THE MOST REMOTE PORTION OF A
 NON-SPRINKLERED FLOOR OR STORY IS LOCATED IN EXCESS OF
 150 FT (45.7 M) OF TRAVEL DISTANCE FROM A HOSE
 CONNECTION IN OR ADJACENT TO A REQUIRED EXIT OR THE
 MOST REMOTE PORTION OF A SPRINKLERED FLOOR OR STORY
 IS LOCATED IN EXCESS OF 200 FT (61 M) OF TRAVEL
 DISTANCE FROM A HOSE CONNECTION IN OR ADJACENT TO A
 REQUIRED EXIT, ADDITIONAL HOSE CONNECTIONS SHALL BE
 PROVIDED, IN APPROVED LOCATIONS, WHERE REQUIRED BY THE
 LOCAL FIRE DEPARTMENT OR THE AHJ.
  
 7C. PER NFPA 1
  
 18.3 WATER SUPPLIES.
 18.3.1* AN APPROVED WATER SUPPLY CAPABLE OF SUPPLYING
 THE REQUIRED FIRE FLOW FOR FIRE PROTECTION SHALL BE
 PROVIDED TO ALL PREMISES UPON WHICH FACILITIES,
 BUILDINGS, OR PORTIONS OF BUILDINGS ARE HEREAFTER
 CONSTRUCTED OR MOVED INTO THE JURISDICTION. THE
 APPROVED WATER SUPPLY SHALL BE IN ACCORDANCE WITH
 SECTION 18.4.
  
 PER FLORIDA ADMINISTRATIVE CODE SECTION 61G15-32.004,
 FIRE PROTECTION ENGINEERING DOCUMENTS SHALL INCLUDE THE
 POINT OF SERVICE FOR THE WATER SUPPLY, A LIST OF
 APPLICABLE NFPA STANDARDS APPLICABLE TO THE PROJECT,
 CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR
 AREA, SUPPRESSION SYSTEM TYPE, DESIGN DENSITIES, WATER
 SUPPLY DATA (FIRE PUMP DATA, HYDRANT FLOW TEST DATA)
 AND ANY PERFORMANCE BASED INFORMATION SUCH AS
 PRE-ENGINEERED SYSTEMS.
  
 FOR THE PROPOSED FIRE PUMP(S) , WHAT IS(ARE) THE
 PRIMARY AND SECONDARY POWER SOURCES?
  
 7D. THE LOCATION OF THE DDCV FIRE LINE LOCATION SHALL
 MEET THE REQUIREMENTS OF NFPA 24 AND SHALL BE
 COORDINATED WITH THE OFFICE OF FIRE MARSHAL, THE CITY'S
 ENGINEERS OFFICE, THE LANDSCAPE PLANNER, AND THE CITY'S
 PLANNING AND ZONING OFFICE.
  
 8. A CLASS ?A? NFPA 72 COMPLIANT MONITORED FIRE ALARM
 SYSTEM IS REQUIRED FOR THIS STRUCTURE. SEPARATE SHOP
 DRAWINGS, ARE REQUIRED TO BE SUBMITTED, REVIEWED AND
 APPROVED BY THE FIRE PREVENTION BUREAU PRIOR TO ANY
 INSTALLATION.
  
 9. ALL ELEVATORS SHALL BE EQUIPPED WITH A REGION 7
 KEYWAY SYSTEM.
  
 ALL NEW ELEVATORS SHALL CONFORM TO THE FIRE FIGHTER?S
 EMERGENCY OPERATIONS REQUIREMENTS OF ASME A17.1/CSA
 B44, SAFETY CODE FOR ELEVATORS.
  
 ANY BUILDING THAT IS MORE THAN THREE STORIES HIGH OR IN
 WHICH THE VERTICAL DISTANCE BETWEEN THE BOTTOM TERMINAL
 LANDING AND THE TOP TERMINAL LANDING EXCEEDS 25 FEET
 MUST BE CONSTRUCTED TO CONTAIN AT LEAST ONE PASSENGER
 ELEVATOR THAT IS OPERATIONAL AND WILL ACCOMMODATE AN
 AMBULANCE STRETCHER 76 INCHES LONG AND 24 INCHES WIDE
 IN THE HORIZONTAL POSITION.
  
 10. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL
 BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL
 DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS,
 EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A
 PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE
 SAFETY FEATURES AND EQUIPMENT.
  
 10A. PLEASE REVIEW THE OCCUPANCY LOAD OF THE POOL DECK
 AND THE REQUIRED EXITING REQUIREMENTS AND EXIT
 SEPARATION DISTANCES TO ENSURE COMPLAINCE WITH NFPA
 101, CH 12, ASSEMBLY OCCUPANCIES AND CH 7, MEANS OF
 EGRESS. THREE OR MORE EXITS MAY BE REQUIRED.
  
 11. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS
 DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED
 ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF
 FIRE PREVENTION.
  
 ALL NEW FIRE HYDRANTS AND FDC?S PLANNED FOR THIS
 DEVELOPMENT SHALL BE CLOSELY COORDINATED WITH THE
 BUREAU OF FIRE PREVENTION. PROPOSED FIRE HYDRANTS AND
 FDC?S SHOULD BE LOCATED ON THE SAME SIDE OF THE STREET
 OR ACCESS ROADWAY TO ALLOW FREE ACCESS FOR OTHER
 ARRIVING EMERGENCY VEHICLES.
  
 12. COMMAND ROOM
  
 THE FIRE COMMAND CENTER SHALL COMPLY WITH NFPA 1,
 CHAPTER 11, BUILDING SERVICES; 11.9 AND SHALL CONTAIN
 THE FOLLOWING FEATURES:
  
 A. SHALL BE A MINIMUM OF 200 FT SQUARED WITH A MINIMUM
 DIMENSION OF 10 FT.
 B. THE FIRE DEPARTMENT COMMUNICATIONS SYSTEM.
 C. A TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED
 ACCESS TO THE PUBLIC TELEPHONE SYSTEM
 D. SCHEMATIC BUILDING PLANS INDICATING THE TYPICAL
 FLOOR PLAN AND DETAILING THE BUILDING CORE, MEANS OF
 EGRESS, FIRE PROTECTION SYSTEMS, FIRE-FIGHTING
 EQUIPMENT AND FIRE DEPARTMENT ACCESS AND THE LOCATION
 OF FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE
 BARRIERS AND SMOKE PARTITIONS
 E. A WORK TABLE.
 F. IF APPLICABLE, A HAZARDOUS MATERIAL MANAGEMENT PLAN
 FOR THE BUILDING.
 G. THE EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM
 CONTROL UNIT.
 H. ANNUNCIATOR UNIT VISUALLY INDICATING THE LOCATION OF
 THE ELEVATORS AND WHETHER THEY ARE OPERATIONAL
 I. STATUS INDICATORS AND CONTROLS FOR AIR DISTRIBUTION
 SYSTEMS.
 J. CONTROLS FOR UNLOCKING STAIRWAY DOORS SIMULTANEOUSLY
 K. SPRINKLER VALVE AND WATER FLOW DETECTOR DISPLAY
 PANELS
 L. EMERGENCY AND STANDBY POWER STATUS INDICATORS
 M. FIRE PUMP STATUS INDICATORS
 N. GENERATOR SUPERVISION DEVICES AND MANUAL START AND
 TRANSFER FEATURES.
 O. PUBLIC ADDRESS SYSTEM, WHERE SPECIFICALLY REQUIRED
 BY OTHER SECTIONS OF THIS CODE
 P. CONTROLS REQUIRED FOR SMOKE CONTROL
 Q. ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME
 A17.1.
 R. ELEVATOR EMERGENCY OR STANDBY POWER SELECTOR
 SWITCH(ES), WHERE EMERGENCY OR STANDBY POWER IS
 PROVIDED
  
 11.8.6* EMERGENCY COMMAND CENTER.
  
 11.8.6.1 AN EMERGENCY COMMAND CENTER SHALL BE PROVIDED
 IN A
 LOCATION APPROVED BY THE FIRE DEPARTMENT.
  
 11.8.6.2 THE EMERGENCY COMMAND CENTER SHALL CONTAIN THE
 FOLLOWING:
 (1) VOICE FIRE ALARM SYSTEM PANELS AND CONTROLS
 (2) FIRE DEPARTMENT TWO-WAY TELEPHONE COMMUNICATION
 SERVICE
 PANELS AND CONTROLS WHERE REQUIRED BY ANOTHER SECTION
 OF THIS
 CODE
 (3) FIRE DETECTION AND FIRE ALARM SYSTEM ANNUNCIATION
 PANELS
 (4) ELEVATOR FLOOR LOCATION AND OPERATION ANNUNCIATORS
 (5) ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME
 A17.1/CSA B44, SAFETY CODE FOR ELEVATORS AND ESCALATORS
 (6) ELEVATOR EMERGENCY POWER SELECTOR SWITCH(ES) WHERE
 PROVIDED
 IN ACCORDANCE WITH ASME A17.1/CSA B44
 (7) SPRINKLER VALVE AND WATERFLOW ANNUNCIATORS
 (8) EMERGENCY GENERATOR STATUS INDICATORS
 (9) CONTROLS FOR ANY AUTOMATIC STAIRWAY DOOR UNLOCKING
 SYSTEM
 (10) FIRE PUMP STATUS INDICATORS
 (11) TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED
 ACCESS TO THE
 PUBLIC TELEPHONE SYSTEM
 (12) STAIRWAY VIDEO MONITORING EQUIPMENT AS REQUIRED BY
 11.8.8
  
 13. RADIO
  
 NFPA 1, CHAPTER 11, BUILDING SERVICES; 11.10 TWO-WAY
 RADIO ENHANCEMENT SERVICES.
  
 11.10.1 IN ALL NEW AND EXISTING BUILDINGS, MINIMUM
 RADIO SIGNAL STRENGTH FOR FIRE DEPARTMENT
 COMMUNICATIONS SHALL BE MAINTAINED AT A LEVEL
 DETERMINED BY THE AHJ.
  
 NFPA 72, 24.5.2* TWO-WAY RADIO COMMUNICATIONS
 ENHANCEMENT SYSTEMS.
  
 24.5.2.2 RADIO COVERAGE. RADIO COVERAGE SHALL BE
 PROVIDED THROUGHOUT THE BUILDING AS A PERCENTAGE OF
 FLOOR AREA AS SPECIFIED IN 24.5.2.2.1 THROUGH
 24.5.2.2.3.
 24.5.2.2.1 CRITICAL AREAS. CRITICAL AREAS, SUCH AS THE
 EMERGENCY COMMAND CENTER(S), THE FIRE PUMP ROOM(S),
 EXIT STAIRS, EXIT PASSAGEWAYS, ELEVATOR LOBBIES,
 STANDPIPE CABINETS, SPRINKLER SECTIONAL VALVE
 LOCATIONS, AND OTHER AREAS DEEMED CRITICAL BY THE
 AUTHORITY HAVING JURISDICTION, SHALL BE PROVIDED WITH
 99 PERCENT FLOOR AREA RADIO COVERAGE.
 24.5.2.2.2 GENERAL BUILDING AREAS. GENERAL BUILDING
 AREAS SHALL BE PROVIDED WITH 90 PERCENT FLOOR AREA
 RADIO COVERAGE.
 24.5.2.3 SIGNAL STRENGTH.
 24.5.2.3.1 INBOUND. A MINIMUM INBOUND SIGNAL STRENGTH
 OF -95 DBM, OR OTHER SIGNAL STRENGTH AS REQUIRED BY THE
 AUTHORITY HAVING JURISDICTION, SHALL BE PROVIDED
 THROUGHOUT THE COVERAGE AREA.
 24.5.2.3.2 OUTBOUND. A MINIMUM OUTBOUND SIGNAL STRENGTH
 OF -95 DBM AT THE DONOR SITE, OR OTHER SIGNAL STRENGTH
 AS REQUIRED BY THE AUTHORITY HAVING JURISDICTION, SHALL
 BE PROVIDED FROM THE COVERAGE AREA.
  
 THE SYSTEM SHALL MAINTAIN A MINIMUM RADIO SIGNAL
 STRENGTH OF -95 DBM FOR THE RADIO SYSTEM USED BY WEST
 PALM BEACH FIRE RESCUE. TESTING SHALL BE BY AN
 ACCEPTABLE NATIONAL STANDARD DOCUMENTING PERCENTAGES
 NOTED ABOVE AND BY ACTUAL RADIO TESTING BY FIRE
 PERSONNEL. IF THE MINIMUM CANNOT BE MAINTAINED, A
 BI-DIRECTIONAL AMPLIFIED SYSTEM SHALL BE INSTALLED WITH
 A MINIMUM 2-HOUR RUN TIME BATTERY BACK-UP.
  
 PLEASE CONTACT MARK FILLA, PALM BEACH COUNTY PUBLIC
 SAFETY RADIO SYSTEMS MANAGER, AS OUR RADIOS OPERATE ON
 THEIR SYSTEM FOR DETAILED RADIO FREQUENCY AND
 INSTALLATION INSTRUCTIONS.
  
  
 14. KNOX-BOX KEY SYSTEM SHALL BE REQUIRED FOR THIS
 BUILDING.
  
 ANY GATES SHALL BE PROVIDED WITH KNOX KEY ACCESS LOCKS,
 PADLOCKS AND/OR SWITCHES FOR 24 HOUR EMERGENCY ACCESS.
  
 15. THE SMOKE CONTROL SYSTEM SHALL COMPLY WITH NFPA
 101, CHAPTER 9, BUILDING SERVICE AND FIRE PROTECTION
 EQUIPMENT, INCLUDING:
  
 THE SMOKE CONTROL SYSTEMS SHALL BE INSTALLED,
 INSPECTED, TESTED, AND MAINTAINED IN ACCORDANCE WITH
 NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS; NFPA 204,
 STANDARD FOR SMOKE AND HEAT VENTING; OR NATIONALLY
 RECOGNIZED STANDARDS, ENGINEERING GUIDES, OR
 RECOMMENDED PRACTICES, AS APPROVED BY THE AUTHORITY
 HAVING JURISDICTION.
  
 THE ENGINEER OF RECORD SHALL CLEARLY IDENTIFY THE
 INTENT OF THE SYSTEM, THE DESIGN METHOD USED, THE
 APPROPRIATENESS OF THE METHOD USED, AND THE REQUIRED
 MEANS OF INSPECTING, TESTING, AND MAINTAINING THE
 SYSTEM.
  
 ACCEPTANCE TESTING SHALL BE PERFORMED BY A SPECIAL
 INSPECTOR IN ACCORDANCE WITH SECTION 9.9.
  
 16. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT
 DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL.
  
 17. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING
 PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH
 THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop L LANDSCAPING
Rev No 5 Status P Date 03-29-2021 Cont ID  
Sent By rcaranci Date 04-12-2021 Time 11:41 Rev Time 0.00
Received By rcaranci Date 03-29-2021 Time 11:40 Sent To  
Notes
2021-04-12 11:41:54FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: 350 N AUSTRALIAN Z20080008
 MARCH 29, 2021
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. SATISFIED. PROVIDE A COMPLETE TREE SURVEY THAT
 INCLUDES ALL AFFECTED AREAS INCLUDING PAVEMENT OR
 PARKING MODIFICATIONS TO THE ADJACENT PROPERTY.
 THE ADDITIONAL AREAS FOR THE TREE SURVEY HAVE NOT BEEN
 INCLUDED.
  
 2. SATISFIED. PROVIDE A TREE DISPOSITION LIST AND PLAN.
 TREE DISPOSITION IS STILL MISSING EXISTING TREES.
  
 3. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE
 TREES IN GOOD CONDITION TO BE PRESERVED ON SITE OR
 RELOCATED. ANSI A 300 (PART 5) STANDARDS SPECIFY
 EXAMPLES OF SUITABILITY RATINGS OF GOOD, MODERATE, OR
 POOR FOR RELOCATION. PROVIDE CONDITION FOR ALL TREES
 AND RELOCATION POTENTIAL FOR THE NATIVE TREES AND
 PALMS.
 ALL TREES NEED TO BE INCLUDED, AND AN ACCURATE REASON
 FOR REMOVAL PROVIDED. THE EXISTING LIVE OAKS CAN BE
 EITHER PRESERVED IN PLACE OR RELOCATED TO CITY
 PROPERTY.
  
  
 4. SATISFIED. PROVIDE A DIAGRAM OF THE REQUIRED AND
 PROVIDED PUBLIC AND PRIVATE OPEN SPACE AREAS FOR CLD 25
 ZONING DISTRICT. IDENTIFY THE TYPE OF OPEN SPACE AS
 ALLOWED BY TABLE IV-7 AND DEFINITIONS IN SECTION
 94-109. SHOW HOW THE STANDARDS FOR THE TYPES OF OPEN
 SPACE ARE MET FOR VEGETATED AREAS AND TREE CANOPY
 SQUARE FOOTAGE BASED ON TABLE IV-8.
 THE REQUIRED PRIVATE OPEN SPACE NEEDS TO BE QUANTIFIED,
 IDENTIFIED AS TO THE TYPE, AND ALL REQUIREMENTS NEED TO
 BE SHOWN FOR THAT OPEN SPACE TYPE. THE ROOFTOP AREA
 WITH THE POOL WOULD BE ROOFTOP GARDEN. THE PUBLIC OPEN
 SPACE NEEDS TO BE IDENTIFIED AS A TYPE THAT FITS,
 PROBABLY GARDEN PLAZA, AND THE REQUIREMENTS SHOWN.
  
 FOR THE PRIVATE OPEN SPACE ROOFTOP GARDEN CORRECT THE
 TREE CANOPY SQUARE FOOTAGE FOR TREE TYPES BASED ON
 TABLE IV-8.
 PROVIDE THE DETAILS ON THE PLANT LIST AND TREE CANOPY
 CREDITS FOR THE PUBLIC OPEN SPACE.
  
 5. SATISFIED. ADD RELOCATED TREES OR PALMS TO THE PLANT
 LIST AND COUNT THEM TOWARD THE REQUIRED TREES.
 TREE SURVEY AND TREE DISPOSITION NEED TO BE COMPLETED.
  
 6. SATISFIED. PROVIDE CALCULATIONS FOR REQUIRED STREET
 TREES AT ONE FOR EVERY 30 FEET OR PORTION THEREOF FOR
 STREETSCAPE LENGTH, AND SHOW THE NUMBER PROVIDED PER
 SECTION 94-113 AND 94-116.
 STREET TREE CALCULATIONS AND PLAN NEED TO BE PROVIDED.
  
 7. SATISFIED. THERE APPEAR TO BE CONFLICTS IN SEVERAL
 LOCATIONS BETWEEN EXISTING TREES AND WATER AND SEWER
 LINES ON THE LANDSCAPE PLAN. ADJUST LOCATIONS OF
 UTILITY LINES TO RESOLVE CONFLICTS WITH EXISTING TREES
 AND LANDSCAPING IN THE OPEN SPACE. THE REQUIRED STREET
 TREES PROPOSED ALONG CLEARWATER ARE IN CONFLICT WITH AN
 EXISTING SEWER LINE.
 FROM THE ACTUAL UTILITY LOCATIONS, THERE IS A WATER
 LINE THAT WOULD CONFLICT WITH THE STREET TREE LOCATIONS
 THAT WOULD HAVE TO BE RELOCATED ALSO.
  
 8. SATISFIED. PROVIDE A COMPLETE PLANT LIST.
 PLANT LIST NEEDS TO BE MODIFIED TO SEPARATE THE
 REQUIRED OPEN SPACE PLANT LISTS.
  
  
 9. SATISFIED. REMOVE HIGHRISE CULTIVAR AND INDICATE
 SPECIES LIVE OAK.
  
 10. SATISFIED. PROVIDE THE 50 REQUIRED FLORIDA FRIENDLY
 POINTS BASED ON THE FINAL PLANT LIST PER SECTION
 94-443(G).
 REVISE AFTER ALL CHANGES ARE COMPLETE WITH LANDSCAPE
 PLAN. 6A. DOES NOT QUALIFY.
 PROVIDE ANY JUSTIFICATION FOR 6A.OR PROVIDE OTHER
 POINTS.
  
 11. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L.
 PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT
 MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT
 TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE
 LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH
 FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH
 FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED
 ON THE PLANT LIST.
 REVISE AFTER ALL CHANGES ARE COMPLETE WITH LANDSCAPE
 PLAN.
  
 ADDITIONAL COMMENTS 11/4/20:
  
 12. SATISFIED. THE TWO LIVE OAK TREES K AND L SHOULD BE
 PRESERVED, AND THE PLAZA DESIGNED AROUND THEM
  
 13. SATISFIED. THERE ARE LIVE OAK TREES THAT ARE IN
 CONFLICT WITH EXISTING ABOVE GROUND UTILITY VALVES.
 THIS NEEDS TO BE ADDRESSED IF THE VALVE LOCATIONS ARE
 NOT BEING MODIFIED.
  
 14. SATISFIED. OPEN SPACE CALCULATIONS FOR REQUIRED
 TREES NEED TO BE SEPARATED FROM THE REQUIRED PUBLIC AND
 PRIVATE OPEN SPACE AREAS.
  
 15. SATISFIED. PROVIDE BUFFER REQUIREMENTS ON THE CHART
 FOR THE SOUTHERN AREAS OF THE LOT ADJACENT TO PROPERTY
 LINES.
  
 16. SATISFIED. ANY NEW PARKING CREATED MUST MEET THE
 REQUIREMENTS OF SECTION 94-443(C)(3) A. INCLUDING
 TERMINAL LANDSCAPE ISLANDS. THE CONFLICT WITH THE
 RELOCATED HYDRANT AND THE PROPOSED OAK TREE ADJACENT TO
 THE PROPOSED PARKING.
  
 ADDITIONAL COMMENTS 3/23/21:
  
 17. MAKE THE FOLLOWING CORRECTIONS TO THE TREE
 DISPOSITION PLAN:
 ? SATISFIED. THE TREE DISPOSITION PLAN NEEDS TO FOLLOW
 WEST PALM BEACH CODE SECTION 94-448, REMOVE REFERENCES
 TO OTHER COUNTY(?) CODES.
 ? SATISFIED. REMOVE COCOPLUM FROM LIST, AS IT IS NOT
 CLASSIFIED AS A TREE.
 ? SATISFIED. ADD A COLUMN TO THE CHART FOR MITIGATION
 SQUARE FOOTAGE DUE
 ? SATISFIED. WASHINGTONIA PALMS ARE CATEGORY 4 AND ARE
 50 SQ FT MITIGATION DUE.
 ? SATISFIED. ROYAL PALMS ARE CATEGORY 3 AND ARE 100 SQ
 FT MITIGATION DUE.
 ? SATISFIED. OLEANDER IS CATEGORY 3 AND IS 100 SQ FT
 MITIGATION DUE.
 ? SATISFIED. PROVIDE TOTAL OF MITIGATION SQUARE FOOTAGE
 DUE.
 ? SATISFIED. PROVIDE A TOTAL OF MITIGATION SQUARE
 FOOTAGE PROVIDED BASED ON THE PLANT LIST.
  
 18. SATISFIED. THERE IS STILL A CONFLICT WITH THE LIVE
 OAK TREE, THE SEWER LINE AND THE FDC ON THE SOUTH SIDE
 OF PROPOSED PARKING. A PARKING SPACE MAY HAVE TO BE
 CONVERTED TO LANDSCAPE AREA TO RESOLVE THE CONFLICT.
 19. SATISFIED. STREET TREES NEED TO BE SHOWN LOCATED
 BETWEEN THE BACK OF CURB AND SIDEWALK IN THE PLANTING
 STRIP.
 20. SATISFIED. PROVIDE SCREENING HEDGES FOR ALL GROUND
 MOUNTED VALVES AND EQUIPMENT AND ADD A NOTE THAT ALL
 EQUIPMENT WILL BE SCREENED.
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop L LANDSCAPING
Rev No 4 Status F Date 03-23-2021 Cont ID  
Sent By rcaranci Date 03-23-2021 Time 15:30 Rev Time 0.00
Received By rcaranci Date 03-23-2021 Time 15:30 Sent To  
Notes
2021-03-23 15:31:14FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: 350 N AUSTRALIAN Z20080008
 MARCH 23, 2021
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. SATISFIED. PROVIDE A COMPLETE TREE SURVEY THAT
 INCLUDES ALL AFFECTED AREAS INCLUDING PAVEMENT OR
 PARKING MODIFICATIONS TO THE ADJACENT PROPERTY.
 THE ADDITIONAL AREAS FOR THE TREE SURVEY HAVE NOT BEEN
 INCLUDED.
  
 2. SATISFIED. PROVIDE A TREE DISPOSITION LIST AND PLAN.
 TREE DISPOSITION IS STILL MISSING EXISTING TREES.
  
 3. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE
 TREES IN GOOD CONDITION TO BE PRESERVED ON SITE OR
 RELOCATED. ANSI A 300 (PART 5) STANDARDS SPECIFY
 EXAMPLES OF SUITABILITY RATINGS OF GOOD, MODERATE, OR
 POOR FOR RELOCATION. PROVIDE CONDITION FOR ALL TREES
 AND RELOCATION POTENTIAL FOR THE NATIVE TREES AND
 PALMS.
 ALL TREES NEED TO BE INCLUDED, AND AN ACCURATE REASON
 FOR REMOVAL PROVIDED. THE EXISTING LIVE OAKS CAN BE
 EITHER PRESERVED IN PLACE OR RELOCATED TO CITY
 PROPERTY.
  
  
 4. PARTIALLY SATISFIED. PROVIDE A DIAGRAM OF THE
 REQUIRED AND PROVIDED PUBLIC AND PRIVATE OPEN SPACE
 AREAS FOR CLD 25 ZONING DISTRICT. IDENTIFY THE TYPE OF
 OPEN SPACE AS ALLOWED BY TABLE IV-7 AND DEFINITIONS IN
 SECTION 94-109. SHOW HOW THE STANDARDS FOR THE TYPES OF
 OPEN SPACE ARE MET FOR VEGETATED AREAS AND TREE CANOPY
 SQUARE FOOTAGE BASED ON TABLE IV-8.
 THE REQUIRED PRIVATE OPEN SPACE NEEDS TO BE QUANTIFIED,
 IDENTIFIED AS TO THE TYPE, AND ALL REQUIREMENTS NEED TO
 BE SHOWN FOR THAT OPEN SPACE TYPE. THE ROOFTOP AREA
 WITH THE POOL WOULD BE ROOFTOP GARDEN. THE PUBLIC OPEN
 SPACE NEEDS TO BE IDENTIFIED AS A TYPE THAT FITS,
 PROBABLY GARDEN PLAZA, AND THE REQUIREMENTS SHOWN.
  
 FOR THE PRIVATE OPEN SPACE ROOFTOP GARDEN CORRECT THE
 TREE CANOPY SQUARE FOOTAGE FOR TREE TYPES BASED ON
 TABLE IV-8.
 PROVIDE THE DETAILS ON THE PLANT LIST AND TREE CANOPY
 CREDITS FOR THE PUBLIC OPEN SPACE.
  
 5. SATISFIED. ADD RELOCATED TREES OR PALMS TO THE PLANT
 LIST AND COUNT THEM TOWARD THE REQUIRED TREES.
 TREE SURVEY AND TREE DISPOSITION NEED TO BE COMPLETED.
  
 6. SATISFIED. PROVIDE CALCULATIONS FOR REQUIRED STREET
 TREES AT ONE FOR EVERY 30 FEET OR PORTION THEREOF FOR
 STREETSCAPE LENGTH, AND SHOW THE NUMBER PROVIDED PER
 SECTION 94-113 AND 94-116.
 STREET TREE CALCULATIONS AND PLAN NEED TO BE PROVIDED.
  
 7. SATISFIED. THERE APPEAR TO BE CONFLICTS IN SEVERAL
 LOCATIONS BETWEEN EXISTING TREES AND WATER AND SEWER
 LINES ON THE LANDSCAPE PLAN. ADJUST LOCATIONS OF
 UTILITY LINES TO RESOLVE CONFLICTS WITH EXISTING TREES
 AND LANDSCAPING IN THE OPEN SPACE. THE REQUIRED STREET
 TREES PROPOSED ALONG CLEARWATER ARE IN CONFLICT WITH AN
 EXISTING SEWER LINE.
 FROM THE ACTUAL UTILITY LOCATIONS, THERE IS A WATER
 LINE THAT WOULD CONFLICT WITH THE STREET TREE LOCATIONS
 THAT WOULD HAVE TO BE RELOCATED ALSO.
  
 8. SATISFIED. PROVIDE A COMPLETE PLANT LIST.
 PLANT LIST NEEDS TO BE MODIFIED TO SEPARATE THE
 REQUIRED OPEN SPACE PLANT LISTS.
  
  
 9. SATISFIED. REMOVE HIGHRISE CULTIVAR AND INDICATE
 SPECIES LIVE OAK.
  
 10. PARTIALLY SATISFIED. PROVIDE THE 50 REQUIRED
 FLORIDA FRIENDLY POINTS BASED ON THE FINAL PLANT LIST
 PER SECTION 94-443(G).
 REVISE AFTER ALL CHANGES ARE COMPLETE WITH LANDSCAPE
 PLAN. 6A. DOES NOT QUALIFY.
 PROVIDE ANY JUSTIFICATION FOR 6A.OR PROVIDE OTHER
 POINTS.
  
 11. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L.
 PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT
 MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT
 TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE
 LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH
 FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH
 FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED
 ON THE PLANT LIST.
 REVISE AFTER ALL CHANGES ARE COMPLETE WITH LANDSCAPE
 PLAN.
  
 ADDITIONAL COMMENTS 11/4/20:
  
 12. SATISFIED. THE TWO LIVE OAK TREES K AND L SHOULD BE
 PRESERVED, AND THE PLAZA DESIGNED AROUND THEM
  
 13. SATISFIED. THERE ARE LIVE OAK TREES THAT ARE IN
 CONFLICT WITH EXISTING ABOVE GROUND UTILITY VALVES.
 THIS NEEDS TO BE ADDRESSED IF THE VALVE LOCATIONS ARE
 NOT BEING MODIFIED.
  
 14. SATISFIED. OPEN SPACE CALCULATIONS FOR REQUIRED
 TREES NEED TO BE SEPARATED FROM THE REQUIRED PUBLIC AND
 PRIVATE OPEN SPACE AREAS.
  
 15. SATISFIED. PROVIDE BUFFER REQUIREMENTS ON THE CHART
 FOR THE SOUTHERN AREAS OF THE LOT ADJACENT TO PROPERTY
 LINES.
  
 16. SATISFIED. ANY NEW PARKING CREATED MUST MEET THE
 REQUIREMENTS OF SECTION 94-443(C)(3) A. INCLUDING
 TERMINAL LANDSCAPE ISLANDS. THE CONFLICT WITH THE
 RELOCATED HYDRANT AND THE PROPOSED OAK TREE ADJACENT TO
 THE PROPOSED PARKING.
  
 ADDITIONAL COMMENTS 4/23/21:
  
 17. MAKE THE FOLLOWING CORRECTIONS TO THE TREE
 DISPOSITION PLAN:
 ? THE TREE DISPOSITION PLAN NEEDS TO FOLLOW WEST PALM
 BEACH CODE SECTION 94-448, REMOVE REFERENCES TO OTHER
 COUNTY(?) CODES.
 ? REMOVE COCOPLUM FROM LIST, AS IT IS NOT CLASSIFIED AS
 A TREE.
 ? ADD A COLUMN TO THE CHART FOR MITIGATION SQUARE
 FOOTAGE DUE
 ? WASHINGTONIA PALMS ARE CATEGORY 4 AND ARE 50 SQ FT
 MITIGATION DUE.
 ? ROYAL PALMS ARE CATEGORY 3 AND ARE 100 SQ FT
 MITIGATION DUE.
 ? OLEANDER IS CATEGORY 2 AND IS 100 SQ FT MITIGATION
 DUE.
 ? PROVIDE TOTAL OF MITIGATION SQUARE FOOTAGE DUE.
 ? PROVIDE A TOTAL OF MITIGATION SQUARE FOOTAGE PROVIDED
 BASED ON THE PLANT LIST.
  
 18. THERE IS STILL A CONFLICT WITH THE LIVE OAK TREE,
 THE SEWER LINE AND THE FDC ON THE SOUTH SIDE OF
 PROPOSED PARKING. A PARKING SPACE MAY HAVE TO BE
 CONVERTED TO LANDSCAPE AREA TO RESOLVE THE CONFLICT.
 19. STREET TREES NEED TO BE SHOWN LOCATED BETWEEN THE
 BACK OF CURB AND SIDEWALK IN THE PLANTING STRIP.
 20. PROVIDE SCREENING HEDGES FOR ALL GROUND MOUNTED
 VALVES AND EQUIPMENT AND ADD A NOTE THAT ALL EQUIPMENT
 WILL BE SCREENED.
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop L LANDSCAPING
Rev No 3 Status F Date 03-23-2021 Cont ID  
Sent By rcaranci Date 03-23-2021 Time 14:02 Rev Time 0.00
Received By rcaranci Date 03-23-2021 Time 14:02 Sent To  
Notes
***NONE***

Review Stop L LANDSCAPING
Rev No 2 Status F Date 11-04-2020 Cont ID  
Sent By rcaranci Date 11-04-2020 Time 16:40 Rev Time 0.00
Received By rcaranci Date 11-04-2020 Time 16:40 Sent To  
Notes
2020-11-04 16:41:13FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: 350 N AUSTRALIAN Z20080008
 NOVEMBER 4, 2020
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. NOT SATISFIED. PROVIDE A COMPLETE TREE SURVEY THAT
 INCLUDES ALL AFFECTED AREAS INCLUDING PAVEMENT OR
 PARKING MODIFICATIONS TO THE ADJACENT PROPERTY.
 THE ADDITIONAL AREAS FOR THE TREE SURVEY HAVE NOT BEEN
 INCLUDED.
  
 2. PARTIALLY SATISFIED. PROVIDE A TREE DISPOSITION LIST
 AND PLAN.
 TREE DISPOSITION IS STILL MISSING EXISTING TREES.
  
 3. PARTIALLY SATISFIED. SECTION 94-448 (D)(3) REQUIRES
 NATIVE TREES IN GOOD CONDITION TO BE PRESERVED ON SITE
 OR RELOCATED. ANSI A 300 (PART 5) STANDARDS SPECIFY
 EXAMPLES OF SUITABILITY RATINGS OF GOOD, MODERATE, OR
 POOR FOR RELOCATION. PROVIDE CONDITION FOR ALL TREES
 AND RELOCATION POTENTIAL FOR THE NATIVE TREES AND
 PALMS.
 ALL TREES NEED TO BE INCLUDED, AND AN ACCURATE REASON
 FOR REMOVAL PROVIDED. THE EXISTING LIVE OAKS CAN BE
 EITHER PRESERVED IN PLACE OR RELOCATED TO CITY
 PROPERTY.
  
  
 4. PARTIALLY SATISFIED. PROVIDE A DIAGRAM OF THE
 REQUIRED AND PROVIDED PUBLIC AND PRIVATE OPEN SPACE
 AREAS FOR CLD 25 ZONING DISTRICT. IDENTIFY THE TYPE OF
 OPEN SPACE AS ALLOWED BY TABLE IV-7 AND DEFINITIONS IN
 SECTION 94-109. SHOW HOW THE STANDARDS FOR THE TYPES OF
 OPEN SPACE ARE MET FOR VEGETATED AREAS AND TREE CANOPY
 SQUARE FOOTAGE BASED ON TABLE IV-8.
 THE REQUIRED PRIVATE OPEN SPACE NEEDS TO BE QUANTIFIED,
 IDENTIFIED AS TO THE TYPE, AND ALL REQUIREMENTS NEED TO
 BE SHOWN FOR THAT OPEN SPACE TYPE. THE ROOFTOP AREA
 WITH THE POOL WOULD BE ROOFTOP GARDEN. THE PUBLIC OPEN
 SPACE NEEDS TO BE IDENTIFIED AS A TYPE THAT FITS,
 PROBABLY GARDEN PLAZA, AND THE REQUIREMENTS SHOWN.
  
  
 5. NOT SATISFIED. ADD RELOCATED TREES OR PALMS TO THE
 PLANT LIST AND COUNT THEM TOWARD THE REQUIRED TREES.
 TREE SURVEY AND TREE DISPOSITION NEED TO BE COMPLETED.
  
 6. NOT SATISFIED. PROVIDE CALCULATIONS FOR REQUIRED
 STREET TREES AT ONE FOR EVERY 30 FEET OR PORTION
 THEREOF FOR STREETSCAPE LENGTH, AND SHOW THE NUMBER
 PROVIDED PER SECTION 94-113 AND 94-116.
 STREET TREE CALCULATIONS AND PLAN NEED TO BE PROVIDED.
  
 7. PARTIALLY SATISFIED. THERE APPEAR TO BE CONFLICTS IN
 SEVERAL LOCATIONS BETWEEN EXISTING TREES AND WATER AND
 SEWER LINES ON THE LANDSCAPE PLAN. ADJUST LOCATIONS OF
 UTILITY LINES TO RESOLVE CONFLICTS WITH EXISTING TREES
 AND LANDSCAPING IN THE OPEN SPACE. THE REQUIRED STREET
 TREES PROPOSED ALONG CLEARWATER ARE IN CONFLICT WITH AN
 EXISTING SEWER LINE.
 FROM THE ACTUAL UTILITY LOCATIONS, THERE IS A WATER
 LINE THAT WOULD CONFLICT WITH THE STREET TREE LOCATIONS
 THAT WOULD HAVE TO BE RELOCATED ALSO.
  
 8. PARTIALLY SATISFIED. PROVIDE A COMPLETE PLANT LIST.
 PLANT LIST NEEDS TO BE MODIFIED TO SEPARATE THE
 REQUIRED OPEN SPACE PLANT LISTS.
  
  
 9. SATISFIED. REMOVE HIGHRISE CULTIVAR AND INDICATE
 SPECIES LIVE OAK.
  
 10. PARTIALLY SATISFIED. PROVIDE THE 50 REQUIRED
 FLORIDA FRIENDLY POINTS BASED ON THE FINAL PLANT LIST
 PER SECTION 94-443(G).
 REVISE AFTER ALL CHANGES ARE COMPLETE WITH LANDSCAPE
 PLAN. 6A. DOES NOT QUALIFY.
  
  
 11. PARTIALLY SATISFIED. SHOW COMPLIANCE WITH SECTION
 94-445 L. PLANT SPECIES. A MINIMUM OF 60 PERCENT OF
 PLANT MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT
 TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE
 LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH
 FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH
 FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED
 ON THE PLANT LIST.
 REVISE AFTER ALL CHANGES ARE COMPLETE WITH LANDSCAPE
 PLAN.
  
 ADDITIONAL COMMENTS 11/4/20:
  
 12. THE TWO LIVE OAK TREES K AND L SHOULD BE PRESERVED,
 AND THE PLAZA DESIGNED AROUND THEM
  
 13. THERE ARE LIVE OAK TREES THAT ARE IN CONFLICT WITH
 EXISTING ABOVE GROUND UTILITY VALVES. THIS NEEDS TO BE
 ADDRESSED IF THE VALVE LOCATIONS ARE NOT BEING
 MODIFIED.
  
 14. OPEN SPACE CALCULATIONS FOR REQUIRED TREES NEED TO
 BE SEPARATED FROM THE REQUIRED PUBLIC AND PRIVATE OPEN
 SPACE AREAS.
  
 15. PROVIDE BUFFER REQUIREMENTS ON THE CHART FOR THE
 SOUTHERN AREAS OF THE LOT ADJACENT TO PROPERTY LINES.
  
 16. ANY NEW PARKING CREATED MUST MEET THE REQUIREMENTS
 OF SECTION 94-443(C)(3) A. INCLUDING TERMINAL LANDSCAPE
 ISLANDS. THE CONFLICT WITH THE RELOCATED HYDRANT AND
 THE PROPOSED OAK TREE ADJACENT TO THE PROPOSED PARKING.
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop L LANDSCAPING
Rev No 1 Status F Date 09-08-2020 Cont ID  
Sent By rcaranci Date 09-08-2020 Time 13:19 Rev Time 0.00
Received By rcaranci Date 09-08-2020 Time 13:19 Sent To  
Notes
2020-09-08 13:19:29FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: 350 N AUSTRALIAN Z20080008
 SEPTEMBER 8, 2020
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. PROVIDE A COMPLETE TREE SURVEY THAT INCLUDES ALL
 AFFECTED AREAS INCLUDING PAVEMENT OR PARKING
 MODIFICATIONS TO THE ADJACENT PROPERTY.
 2. PROVIDE A TREE DISPOSITION LIST AND PLAN.
 3. SECTION 94-448 (D)(3) REQUIRES NATIVE TREES IN GOOD
 CONDITION TO BE PRESERVED ON SITE OR RELOCATED. ANSI A
 300 (PART 5) STANDARDS SPECIFY EXAMPLES OF SUITABILITY
 RATINGS OF GOOD, MODERATE, OR POOR FOR RELOCATION.
 PROVIDE CONDITION FOR ALL TREES AND RELOCATION
 POTENTIAL FOR THE NATIVE TREES AND PALMS.
 4. PROVIDE A DIAGRAM OF THE REQUIRED AND PROVIDED
 PUBLIC AND PRIVATE OPEN SPACE AREAS FOR CLD 25 ZONING
 DISTRICT. IDENTIFY THE TYPE OF OPEN SPACE AS ALLOWED BY
 TABLE IV-7 AND DEFINITIONS IN SECTION 94-109. SHOW HOW
 THE STANDARDS FOR THE TYPES OF OPEN SPACE ARE MET FOR
 VEGETATED AREAS AND TREE CANOPY SQUARE FOOTAGE BASED ON
 TABLE IV-8.
  
 5. ADD RELOCATED TREES OR PALMS TO THE PLANT LIST AND
 COUNT THEM TOWARD THE REQUIRED TREES.
  
 6. PROVIDE CALCULATIONS FOR REQUIRED STREET TREES AT
 ONE FOR EVERY 30 FEET OR PORTION THEREOF FOR
 STREETSCAPE LENGTH, AND SHOW THE NUMBER PROVIDED PER
 SECTION 94-113 AND 94-116.
  
 7. THERE APPEAR TO BE CONFLICTS IN SEVERAL LOCATIONS
 BETWEEN EXISTING TREES AND WATER AND SEWER LINES ON THE
 LANDSCAPE PLAN. ADJUST LOCATIONS OF UTILITY LINES TO
 RESOLVE CONFLICTS WITH EXISTING TREES AND LANDSCAPING
 IN THE OPEN SPACE. THE REQUIRED STREET TREES PROPOSED
 ALONG CLEARWATER ARE IN CONFLICT WITH AN EXISTING SEWER
 LINE.
  
 8. PROVIDE A COMPLETE PLANT LIST.
  
 9. REMOVE HIGHRISE CULTIVAR AND INDICATE SPECIES LIVE
 OAK.
  
 10. PROVIDE THE 50 REQUIRED FLORIDA FRIENDLY POINTS
 BASED ON THE FINAL PLANT LIST PER SECTION 94-443(G).
  
 11. SHOW COMPLIANCE WITH SECTION 94-445 L. PLANT
 SPECIES. A MINIMUM OF 60 PERCENT OF PLANT MATERIAL
 ADDED SHALL BE FLORIDA NATIVE OR DROUGHT TOLERANT
 SPECIES SELECTED FROM THE CITY LIST OR THE LIST OF
 SPECIES IN THE MOST RECENT EDITION OF SOUTH FLORIDA
 WATER MANAGEMENT DISTRICT WATERWISE SOUTH FLORIDA
 LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED ON THE
 PLANT LIST.
  
  
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop PARK PARKING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop POLICE POLICE
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PW PUBLIC WORKS
Rev No 2 Status P Date 03-24-2021 Cont ID  
Sent By   Date 03-24-2021 Time   Rev Time 0.00
Received By   Date 03-24-2021 Time   Sent To  
Notes
2021-03-24 10:50:03PASSED WITH A PROVISO.THE COMPACTORS CONTAINERS SHALL
 BE FRONT LOAD TYPE IN ORDER TO BE SERVICED BY THE
 CITY`S SANITATION COLLECTION FRONT LOADER VEHICLES.
  
 DEPT OF PUBLIC WORKS
 MATT HEJAZI
 [email protected]
 561-822-2045

Review Stop PW PUBLIC WORKS
Rev No 1 Status F Date 09-08-2020 Cont ID  
Sent By   Date 09-08-2020 Time   Rev Time  
Received By   Date 09-08-2020 Time   Sent To  
Notes
2020-09-08 17:02:10PLEASE PROVIDE THE FOLLOWINGS:
 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID
 WASTE VOLUME PRODUCED ALONG WITH THE SIZE AND TYPE OF
 THE CONTAINER (I.E. DUMPSTER/COMPACTOR) THAT WILL BE
 UTILIZED THAT WILL BE UTILIZED FOR THE SANITATION
 SERVICE.
 2- DUMPSTER ENCLOSURE DETAI, IF APPLICABLE. FOR A
 FREESTANDING SITE DUMPSTER ENCLOSURE, THE ENCLOSURE
 SHALL COMPLY WITH THE LATEST REVISION OF CITY OF WEST
 PALM BEACH GENERAL CONSTRUCTION-GARBAGE ENCLOSURE
 STANDARD, GC-7.
 3- AUTO TURN FOR THE SANITATION SERVICE, FRONT LOADER
 TRUCK WITH THE FOLLOWING SPECS:
 - TRUCK LENGTH: 35 FT
 - TRUCK WIDTH: 11 FT
 - TURNING RADIUS:
 - SAE TURNING RADIUS: 32.5 FT
 - CURB-TO-CURB DIAMETER: 74 FT
 - WALL-TO-WALL DIAMETER: 86.3 FT
 4- DESIGNATED LOCATION FOR THE BULK ITEM PICK UP AND
 RECYCLING CONTAINERS.
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045
  

Review Stop STORM STORMWATER
Rev No 2 Status P Date 04-06-2021 Cont ID  
Sent By tward Date 04-06-2021 Time 11:00 Rev Time 0.00
Received By tward Date 04-06-2021 Time 11:42 Sent To  
Notes
2021-04-06 11:41:46THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 3/31/2021 SUBMITTAL. THEY CAN BE ADDRESSED DURING
 ENGINEERING PERMIT SUBMITTAL.
  
 1. SHOW ON THE DEMOLITION PLAN, SHEET C-03, THE
 EXISTING DRAINAGE PIPE CONNECTIONS FOR THE TWO CATCH
 BASINS IN THE NORTHEAST AREA OF THE SITE.
  
 2. THE PGD PLAN (SHEET C-04) CALLS OUT 8' X 10'
 EXFILTRATION TRENCH BUT THE EXFILTRATION TRENCH DETAIL
 ON SHEET C-06 SHOWS 10' X 6.5' TRENCH DIMENSIONS.
  
 3. THE EXFILTRATION TRENCH DETAIL SHOWS A WEIR
 ELEVATION OF 15.70 FT NAVD.
 A. WHERE IS THIS WEIR LOCATED?
 B. LOWEST FINISHED GRADE IS 16.10. SUGGEST USING
 CRUSHED CONCRETE BASE INSTTEAD OF LIMEROCK BASE TO
 CONTEND WITH POTENTIAL SATURATED BASE CONDITIONS.
 C. THE PROPOSED FINISHED GRADE OF THE LAWN OVER THE
 RAINTANKS IS SHOWN TO BE 16.50' NAVD. SHOULD THE
 FINISHED GRADE BE A MINIMUM OF 1 FOOT ABOVE THE WEIR
 ELEVATION?
  
 4. ADD VERTICAL DATUM REFERENCE AND CONVERSION EQUATION
 TO NGVD1929 ON EVERY SHEET WITH ELEVATION INFORMATION.
  
 5. SHOW MINIMUM HORIZONTAL CLEARANCE BETWEEN S.S.M.H.
 #4 AND THE 8" WATER MAIN TO THE NORTH AND NORTHWEST OF
 THE STRUCTURE.
  
 6. CHECK WITH LAURA LE, PUBLIC UTILITIES ENGINEERING,
 WHETHER TO INCLUDE IN THE DESIGN OF THE PROPOSED
 SANITARY SYSTEM ON CLEARWATER DRIVE THE 0.1' DROP
 ACROSS THE MANHOLES AS INDICATED ON THE SEWER MANHOLE
 DETAIL.
  
 7. IF THE TRENCH CUT FOR THE PROPOSED 12" WATER MAIN IS
 WITHIN THE NORTHBOUND LANE OF CLEARWATER DRIVE, THE
 FULL WIDTH OF THE NORTHBOUND LAND WILL NEED TO BE
 MILLED AND RE-SURFACED.
  
 8. AVOID HAVING VALVE COVERS FALL WITHIN THE CURB AND
 GUTTER.
  
 9. THE EXISTING WATER MAIN WILL NEED TO BE PROPERLY
 RESTRAINED DUE TO THE PIPE DEFLECTIONS AND VALVES.
  
 TRACY WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120 (O)
 561-351-0510 (M)
  
  

Review Stop STORM STORMWATER
Rev No 1 Status F Date 09-10-2020 Cont ID  
Sent By tward Date 09-10-2020 Time 15:37 Rev Time 0.00
Received By tward Date 09-10-2020 Time 16:46 Sent To  
Notes
2020-09-10 16:38:11THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. LIST THE VERTICAL DATUM CONVERSION BETWEEN NAVD1988
 AND NGVD1929 ON THE SURVEY.
  
 2. CLEAN UP THE OVERLAPPING SPOT GRADES ON THE SURVEY.
  
 3. ON THE CIVIL PLANS, LIST THE VERTICAL DATUM ON EVERY
 SHEET THAT HAS ELEVATION DATA.
  
 4. BE CONSISTENT IN THE VERTICAL DATUM BEING USED. THE
 SURVEY IS USING NAVD1988. SHEETS C-02 AND C-03 LISTS
 NGVD1929. SHEET C2-04 LISTS NAVD1988. IF USING
 NAVD1988, THEN THE RELATIONSHIP BETWEEN NAVD1988 AND
 NGVD1929 ALSO NEEDS TO BE LISTED ON THE SHEET.
  
 5. USE THE LATEST CITY DETAILS.
  
 6. THE SFWMD ERP MODIFICATION IS TO BE OBTAINED THROUGH
 NORMAL PERMIT APPLICATION SUBMISSION AND REVIEW AND NOT
 OBTAINED THROUGH THE SELF-CERTIFICATION PROCESS.
  
 7. REMOVE THE DRIVEWAY APRON AND INSTALL TYPE F CURB &
 GUTTER AND GREENSPACE BETWEEN THE SIDEWALK AND CURB.
 REMOVE ADA MATS ON EITHER SIDE OF THE DRIVEWAY THAT IS
 BEING REMOVED AND REPAIR THE SIDEWALK FLAGS.
  
 8. DURING CONSTRUCTION, THE DEWATERING DRAWDOWN CURVE
 CANNOT INTERSECT THE HYDROSTATIC SURFACE OF CLEAR LAKE.
  
 9. SHOW THE FIRE HYDRANT ALONG CLEARWATER DRIVE ON THE
 CIVIL AND LANDSCAPE PLANS.
  
 10. NOTE, IN TIMES OF DROUGHT, SFWMD AND/OR THE CITY
 MAY NOT ALLOW THE USE OF POTABLE WATER TO MAINTAIN THE
 WATER LEVEL IN THE WET RETENTION AREA.
  
 11. EXFILTRATION TRENCH IS PROPOSED WITHIN THE BUILDING
 FOOT PRINT. THERE NEEDS TO BE SUFFICIENT VERTICAL
 CLEARANCE FOR MAINTENANCE EQUIPMENT TO ACCESS AND CLEAN
 THE DRAINAGE STRUCTURES.
  
 12. THE EXILTRATION TRENCH WILL EVENTUALLY NEED TO BE
 REHABILITATED OR REPLACED TO RE-ESTABLISH THE DRAINAGE
 CAPACITY. DESIGN AND LOCATION OF THE EXFILTRATION
 TRENCH SHOULD TAKE THIS INTO ACCOUNT.
  
 13. SUGGEST ADDING DRAINAGE STRUCTURES (MANHOLES) AT
 THE EAST AND SOUTH ENDS OF THE EXFILTRATION TRENCH
 SYSTEM TO ALLOW TRAPPED AIR TO ESCAPE FROM THE SYSTEM.
  
 14.MANHOLE LIDS HAVE BEEN KNOWN TO BE BLOWN OFF WHEN
 HIGH RISE ROOF DRAINS ARE CONNECTED TO THE DRAINAGE
 SYSTEM. CONSIDER USING A DEEP AND/OR HEAVY MANHOLE LID
 TO MINIMIZE THIS OCCURANCE.
  
 14. CONFIRM THE BOTTOM OF THE EXFILTRATION TRENCH WILL
 BE 14 FEET BELOW FINISHED GRADE AS DEPICTED ON SHEET
 C-04.
  
 15. REPLACE THE SIDEWALK AT THE NEW DRIVEWAY LOCATION
 WITH 6-INCH THICK CONCRETE.
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3.. PROVIDE SFWMD ERP PERMIT MODIFICATION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  

Review Stop SURVEY SURVEYING
Rev No 4 Status P Date 05-18-2021 Cont ID  
Sent By vnoel Date 05-18-2021 Time 08:51 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
2021-05-18 08:54:33PASSED WITH CONDITIONS:
  
 1. ABANDONED WATER AND SEWER TO BE REMOVED ON FINAL
 ENG. PLANS.
 2. PROFILE TO BE INCLUDED ON FINAL ENG. PLANS.

Review Stop SURVEY SURVEYING
Rev No 3 Status F Date 03-26-2021 Cont ID  
Sent By vnoel Date 03-26-2021 Time 09:21 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
2021-03-26 09:42:391. ABANDONED WATER AND SEWER LINES WILL NEED TO BE
 REMOVED, NOT GROUTED IN PLACE.
 2. PROFILE OF NEW WATER AND SEWER CAN WAIT TILL
 ENGINEERING APPLICATION BUT IF ANY CONFLICTS ARISE THE
 DEVELOPER WILL BE RESPONSIBLE FOR THE OTHER UTILITY
 RELOCATION.
 3. CUSTOMER SERVICE ( MARK HURLEY ) WILL NEED TO
 APPROVE NEW METER/BACKFLOW CONFIGURATION IN SE CORNER.
 4. PLEASE PROVIDE COPY OF CONSENT FROM MASTER
 ASSOCIATION.

Review Stop SURVEY SURVEYING
Rev No 2 Status F Date 11-05-2020 Cont ID  
Sent By vnoel Date 11-05-2020 Time 10:04 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
2020-11-05 10:35:521. DUE TO PROXIMITY TO PROPOSED TREES, WATER MAIN ALONG
 CLEARWATER WILL ALSO NEED TO BE RELOCATED.
 2. SANITARY SEWER LINE RUNNING WEST FROM CLEARWATER
 WILL BE A PRIVATE LINE TO BE MAINTAINED BY THE MASTER
 ASSOCIATION. CITY POINT OF SERVICE WILL BE PROPOSED MH
 #2.
 3. THE METER/BACKFLOWS/IRRIGATION ASSEMBLIES IN THE SE
 CORNER NEEDS TO BE RE-WORKED. IT DOES NOT APPEAR THERE
 IS ROOM ENOUGH BETWEEN THE EXISTING CONCRETE
 POLE/ANCHORS AND THE BUILDING TO SERVICE THE METER.
 4. AS THE SURVEY INCLUDES THE OVERALL PROPERTY, THE
 MASTER ASSOC. NEEDS TO BE A CO-APPLICANT.
  
  
 FOLLOWING ARE COMMENTS FROM LAURA LE, PUBLIC UTILITIES
 ENGINEER
  
 1. NEED TO SHOW EXIST LATERALS AND EXIST WATER
 SERVICES, IF ANY; THE MOST OF THE LATERALS HAVE
 RECENTLY BEEN LINED
 2. DID THEY TV THE SAN SEWER RECENTLY? DOES PIPE SIZE
 MATCH SURVEYED INFO?
 3. EXIST SAN MH NEED TO BE REHABBED. NOT SURE IF THAT
 WAS DONE RECENTLY.
 4. NEED A PROFILE OF THE NEW SAN SEWER
 5. THE SAN SEWER REDUCED BACK TO 8? JUST UPSTREAM OF
 THE LIFT STATION. WE WILL NEED TO LOOK AT THE PIPE
 DOWNSTREAM OF THE PROJECT.
 WE WILL ALSO CHECK THE PUMPS AT THE LIFT STATION
 6. IS THERE AN EASEMENT FOR THE EXIST 8? COMING FROM
 AUSTRALIAN AVE? IS IT CITY?S OWNED AND MAINTAINED?
  

Review Stop SURVEY SURVEYING
Rev No 1 Status F Date 09-08-2020 Cont ID  
Sent By vnoel Date 09-08-2020 Time 10:53 Rev Time  
Received By vnoel Date   Time   Sent To  
Notes
2020-09-08 11:15:271. SURVEY NEEDS TO BE SIGNED AND SEALED.
 2. LOCATION OF EXISTING UTILITIES NEEDS TO BE FIELD
 LOCATED, NOT PER CITY GIS.
 3. NEED COPY OF ALL DOCUMENTS SHOWN IN TITLE POLICY.
 NEED APPLICANT TO EXPLAIN HOW THIS CONDOMINIUM
 ASSOCIATION WILL WORK WITH THE COMMON AREA.
 4. STORMWATER WILL NEED TO REVIEW FOR THE OFF-SITE
 RETENTION.
 5. IT APPEARS THAT THERE ARE 2 OWNERS OF THIS OVERALL
 PROPERTY. WILL NEED CONSENT OF THE ADJOINING EDGE
 MASTER ASSOC.
 6. EXISTING SANITARY ALONG CLEARWATER MAY HAVE RECENTLY
 BEEN LINED.
 7. THERE IS CONCERN OF THE PROPOSED BUILDINGS IN CLOSE
 PROXIMITY TO THE SANITARY.
 8. WHAT DOES THE DRIVEWAY TO THE SOUTHEAST CORNER OF
 THE EDGE CONNECT TO? IT APPEARS TO BE A CONCRETE
 WALKWAY? IS THIS A FIRE EXIT?
 9. THIS SITE MAY NEED TO BE REPLATTED.

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 4 Status F Date 03-31-2021 Cont ID  
Sent By   Date 03-31-2021 Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
2021-03-31 15:38:27TRAFFIC COMMENTS
 1. NOT ACKNOWLEDGED. PER COUNTY RECOMMENDATION: AN
 INTERSECTION ANALYSIS SHALL BE CONDUCTED AT THE BANYAN
 AND CLEARWATER INTERSECTION, AS SOON AS EXISTING ROAD
 CONSTRUCTION IS COMPLETED. DEPENDING ON THE RESULTS AND
 FINDINGS OF SUCH ANALYSIS, DEVELOPER MAY NEED TO
 PROVIDE MITIGATION MEASUREMENTS
 2. PARTIALLY SATISFIED. AUTOTURN ANALYSIS: VEHICLES'
 DYNAMIC ENVELOPE MUST BE COLORED SO TO DISTINGUISH FROM
 ROAD/BUILDING LINES. A BACK-LOADING TRUCK WAS USED AS
 DESIGN VEHICLE, BUT PATHS SHOWN SEEM TO MODEL A FRONT
 LOADER ONE. PLEASE PROVIDE AUTOTURN ANALYSIS FOR A
 SERVICE/MOVING TRUCK ACCESSING THE INTERNAL DOCKS AREA.
 PLEASE SUBMIT AUTOTURN ANALYSIS RESULTS SEPARATE FROM
 OTHER DOCUMENTS/PLANS.
 3. NOT SATISFIED. TDM: IN ORDER TO PROPERLY IDENTIFY
 THE RIGHT STRATEGIES, PLEASE DETERMINE THE NUMBER OF
 DAILY AND PEAK-HOUR VEHICLES REDUCTION REQUIRED TO
 CLEAR THE 1% SIGNIFICANT IMPACT ON THE ROADWAYS
 IDENTIFIED IN THE TRAFFIC STUDY.
 4. NOT SATISFIED. COORDINATE WITH THE COUNTY TO EXTEND
 S AUSTRALIAN AVE SOUTHBOUND LEFT-TURN LANE MEDIAN AT
 THE ONE CLEARLAKE WAY INTERSECTION. SUCH MODIFICATION
 WILL ALLOW SOUTHBOUND LEFT-TURN VEHICLES ONLY, WHILE
 PREVENTING WESTBOUND LEFT-TURN MOVEMENTS WITHOUT THE
 NEED OF A PORK-CHOP ISLAND INSTALLATION. IN CASE OF
 NEGATIVE RESPONSE FROM THE COUNTY ON SUCH
 IMPLEMENTATION, PLEASE PROVIDE CORRESPONDING STATEMENT
 OR CORRESPONDENCE ON THE MATTER.
 5. NOT SATISFIED. AUSTRALIAN AVE AND CLEARWATER PL
 INTERSECTION: RESTRIPE THE WESTBOUND LEG SO TO
 ACCOMMODATE TWO LEFT-TURN ONLY LANES AND ONE LEFT &
 RIGHT LANE. COORDINATE WITH THE COUNTY FOR THE
 ADDITIONAL SIGNAL HEAD NEEDED. IN CASE OF NEGATIVE
 RESPONSE FROM THE COUNTY ON SUCH IMPLEMENTATION, PLEASE
 PROVIDE CORRESPONDING STATEMENT OR CORRESPONDENCE ON
 THE MATTER.
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 3 Status F Date 03-24-2021 Cont ID  
Sent By elevesqu Date 03-24-2021 Time 16:19 Rev Time 0.00
Received By elevesqu Date 03-24-2021 Time 16:19 Sent To  
Notes
2021-03-24 16:19:26Z20080008 - 350 S AUSTRALIAN ? R3 - 2021-03-21
 TRAFFIC COMMENTS
 1. PER COUNTY RECOMMENDATION: AN INTERSECTION ANALYSIS
 SHALL BE CONDUCTED AT THE BANYAN AND CLEARWATER
 INTERSECTION, AS SOON AS EXISTING ROAD CONSTRUCTION IS
 COMPLETED. DEPENDING ON THE RESULTS AND FINDINGS OF
 SUCH ANALYSIS, DEVELOPER MAY NEED TO PROVIDE MITIGATION
 MEASUREMENTS
 2. AUTOTURN ANALYSIS. VEHICLES? DYNAMIC ENVELOPE MUST
 BE COLORED SO TO DISTINGUISH FROM ROAD/BUILDING LINES.
 A BACK-LOADING TRUCK WAS USED AS DESIGN VEHICLE, BUT
 PATHS SHOWN SEEM TO MODEL A FRONT LOADER ONE. PLEASE
 PROVIDE AUTOTURN ANALYSIS FOR A SERVICE/MOVING TRUCK
 ACCESSING THE INTERNAL DOCKS AREA. PLEASE SUBMIT
 AUTOTURN ANALYSIS RESULTS SEPARATE FROM OTHER
 DOCUMENTS/PLANS.
 3. TDM. IN ORDER TO PROPERLY IDENTIFY THE RIGHT
 STRATEGIES, PLEASE DETERMINE THE NUMBER OF DAILY AND
 PEAK-HOUR VEHICLES REDUCTION REQUIRED TO CLEAR THE 1%
 SIGNIFICANT IMPACT ON THE ROADWAYS IDENTIFIED IN THE
 TRAFFIC STUDY.
 4. COORDINATE WITH THE COUNTY TO EXTEND S AUSTRALIAN
 AVE SOUTHBOUND LEFT-TURN LANE MEDIAN AT THE ONE
 CLEARLAKE WAY INTERSECTION. SUCH MODIFICATION WILL
 ALLOW SOUTHBOUND LEFT-TURN VEHICLES ONLY, WHILE
 PREVENTING WESTBOUND LEFT-TURN MOVEMENTS WITHOUT THE
 NEED OF A PORK-CHOP ISLAND INSTALLATION. IN CASE OF
 NEGATIVE RESPONSE FROM THE COUNTY ON SUCH
 IMPLEMENTATION, PLEASE PROVIDE CORRESPONDING STATEMENT
 OR CORRESPONDENCE ON THE MATTER.
 5. AUSTRALIAN AVE AND CLEARWATER PL INTERSECTION:
 RESTRIPE THE WESTBOUND LEG SO TO ACCOMMODATE TWO
 LEFT-TURN ONLY LANES AND ONE LEFT & RIGHT LANE.
 COORDINATE WITH THE COUNTY FOR THE ADDITIONAL SIGNAL
 HEAD NEEDED. IN CASE OF NEGATIVE RESPONSE FROM THE
 COUNTY ON SUCH IMPLEMENTATION, PLEASE PROVIDE
 CORRESPONDING STATEMENT OR CORRESPONDENCE ON THE
 MATTER.
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 2 Status F Date 10-28-2020 Cont ID  
Sent By   Date 11-20-2020 Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
2020-10-28 17:54:51TRAFFIC COMMENTS
 1. PROVIDE COUNTY TPS LETTER ONCE OBTAINED
 2. PROVIDE A PARAGRAPH IN THE REPORT DISCUSSING
 SIGNIFICANT IMPACTS OF THE PROPOSED DEVELOPMENT NEWLY
 GENERATED TRIPS, INCLUSIVE OF A SUMMARY TABLE IN THE
 REPORT LISTING ONLY THE ROADWAY(S) SIGNIFICANTLY
 IMPACTED.
 3. PROVIDE SYNCHRO/HCM ANALYSIS FOR THE FOLLOWING
 INTERSECTIONS:
 A. ACCESS DRIVE AND S AUSTRALIAN AVE (UNSIGNALIZED)
 B. BANYAN BLVD AND CLEARWATER PLACE (UNSIGNALIZED)
 ROADWORK MAY PARTIALLY PRECLUDE DATA COLLECTION ON
 BANYAN, BUT NOT ON AUSTRALIAN.
  
 SITE PLAN COMMENTS
 4. SHOWCASE DRIVEWAY(S) AND CURB DETAIL FOR PROPERTIES
 ON THE OPPOSITE SIDE OF THE ROAD ALONG CLEARWATER DR
 GENERAL COMMENTS
 5. PROVIDE TDM STRATEGIES IN ORDER TO MITIGATE THE
 PROPOSED DEVELOPMENT?S SIGNIFICANT IMPACTS TO THE
 ROADWAY SYSTEM
 6. BASED ON THE RESULTS OF THE INTERSECTION ANALYSIS,
 CITY MAY REQUIRE INSTALLATION OF A HALF-PORK CHOP
 ISLAND ON ONE CLEARLAKE WAY IN ORDER TO ENFORCE BY
 DESIGN RIGHT-TURN-ONLY VEHICLE MOVEMENTS TO AUSTRALIAN
 AVE.
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status F Date 09-09-2020 Cont ID  
Sent By   Date 09-09-2020 Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
2020-09-09 16:35:12TRAFFIC COMMENTS
  
 1) PROVIDE COUNTY TPS LETTER
 2) FIGURES SHALL BE NUMBERED FOR PROPER REFERENCE
 3) TRAFFIC DISTRIBUTION PERCENTAGES DO NOT SEEM
 COMPLETELY CORRECT
 3A) FOR EXAMPLE: 40% OF TRAFFIC HEADS SOUTH ON
 AUSTRALIAN AVE, BUT THE SPLITS AT OKEECHOBEE BLVD DO
 NOT SUM CORRECTLY (FIGURE SHOWS: 20%, 5%, 10%)
 3B) PLEASE REVIEW AND REVISE INCORRECT DISTRIBUTION
 PERCENTAGES
 4) PROVIDE A FIGURE WITH SATELLITE AERIAL SHOWCASING
 SITE LOCATION AND RADIUS OF DEVELOPMENT INFLUENCE
 5) EXEMPTION FROM CONCURRENCY, DOES NOT IMPLY EXEMPTION
 FROM HIGHLIGHTING AND REPORTING PROPOSED DEVELOPMENT'S
 SIGNIFICANT IMPACTS
 5A) PROVIDE A PARAGRAPH IN THE REPORT DISCUSSING
 SIGNIFICANT IMPACTS OF THE PROPOSED DEVELOPMENT' NEWLY
 GENERATED TRIPS, INCLUSIVE OF A TABLE LISTING THE
 ROADWAY(S) SIGNIFICANTLY IMPACTED AND RELATED
 PERFORMANCE MEASURES.
 6) PROVIDE SYNCHRO/HCM ANALYSIS FOR THE FOLLOWING
 INTERSECTIONS:
 6A) CLEARWATER PLACE AND S AUSTRALIAN AVE (SIGNALIZED)
 6B) ACCESS DRIVE AND S AUSTRALIAN AVE (UNSIGNALIZED)
 6C) BANYAN BLVD AND CLEARWATER PLACE (UNSIGNALIZED)
  
 SITE PLAN COMMENTS
  
 7) IDENTIFY EXACT DUMPSTER LOCATION FOR GARBAGE TRUCK
 PICKUP OPERATIONS
 8) PROVIDE AUTOTURN ANALYSIS OF GARBAGE AND SERVICE
 TRUCKS OPERATIONS
 9) REDUCE THE NUMBER OF ACCESS POINT/DRIVEWAYS ON
 CLEARWATER DR TO ONE.
 10) SHOWCASE DRIVEWAY(S) AND CURB DETAIL FOR PROPERTIES
 ON THE OPPOSITE SIDE OF THE ROAD ON CLEARWATER DR
 11) CHAOTIC INTERNAL CIRCULATION SCHEME, HAVE ONE LANE
 IN EACH DIRECTION AT THE MAIN DRIVEWAY THROUGH THE
 BUILDING
 11A) CONSIDER IMPLEMENTING A VALET/DROP-OFF AREA IN
 LIEU OF BY-PASS LANE(S)
  
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop Z ZONING
Rev No 4 Status P Date 03-31-2021 Cont ID  
Sent By elevesqu Date 03-31-2021 Time 13:57 Rev Time 0.00
Received By elevesqu Date 03-31-2021 Time 13:56 Sent To  
Notes
2021-03-31 14:02:51PROVISOS:
  
 A. THE FOLLOWING ITEMS SHALL BE ADDRESSED DURING THE
 BUILDING PERMIT PROCESS:
  
 1. THE DESIGN OF THE PUBLIC OPEN SPACE SHALL BE
 SUBMITTED THROUGH AN AMENDMENT AND SUBJECT TO DAC
 REVIEW. THE PUBLIC OPEN SPACE SHALL EXPLORE THE
 INCORPORATION OF THE AIPP REQUIREMENT. THE AMENDMENT
 SHALL INCLUDE RENDERINGS WHICH SHOW INTERACTION OF
 PUBLIC OPEN SPACE WITH BUILDING.
  
 2. GROUND FLOOR WINDOWS SHALL MAINTAIN TRANSPARENCY
 BETWEEN GROUND FLOOR COMMERCIAL SPACES AND EXTERIOR.
  
 3. PLEASE SUBMIT REVISED SECTION A-A TO ACCURATELY
 REFLECT PROPOSED LANDSCAPE AND WALL SEATING.
  
 4. ALL ROOFTOP EQUIPMENT SHALL BE SCREENED TO THE
 HEIGHT OF THE EQUIPMENT. ALL WALL MOUNTED EQUIPMENT
 SHALL BE ARCHITECTURALLY SCREENED OR PAINTED TO MATCH
 BUILDING FA?ADE
  
 5. ALL GRADE CHANGES SHOULD OCCUR INTERIOR TO THE
 BUILDING, NOT ON THE SIDEWALK/ROW
  
 6. EXACT AMOUNT OF CAR SHARE SPACES OR NEED FOR ANY TO
 BE DETERMINED THROUGHOUT BUILDING PERMIT PROCESS
  
 7. ALL FDC SHALL BE WALL MOUNTED BEHIND LANDSCAPE BEDS
 IF AUTHORIZED BY THE CITY.
  
 8. THE PARKING GARAGE ENTRANCE SHALL BE TREATED,
 INCLUDING THE CEILING FOR THE FIRST 20 FEET. ALL
 PORTIONS OF THE PARKING GARAGE THAT CAN BE SEEN FROM
 THE PUBLIC SIDEWALK OR STREET SHALL BE TREATED
 INCLUDING THE CEILING, AT MINIMUM TO THE FIRST 20 FEET.
 ALL GARAGE LIGHTING SHALL BE SHIELDED FROM THE PUBLIC
 SIDEWALK AND STREETS.
  
 9. THE INCLUSION OF A GATE TO THE SOUTH OF THE EDGE
 PARKING GARAGE SHALL BE EXAMINED TO SCREEN THE DUMPSTER
 STAGING AREA.
  
 10. PROVIDE ARCHITECTURAL SCREENING GATE NOT JUST GATE
 ARM TO SCREEN LOADING AREA FROM ROW.
  
 11. ALL STREET LIGHTS, TREE GRATES, BOLLARDS, PAVERS OR
 ANY OTHER STREETSCAPE ELEMENTS INSTALLED WITHIN THE
 CITY?S ROW SHALL COMPLY WITH CITY?S STANDARDS, AND
 SHALL BE APPROVED BY THE PLANNING DIVISION AND THE
 ENGINEERING SERVICES DEPARTMENT DURING THE BUILDING
 PERMIT PROCESS. ANY FEES ASSOCIATED WITH THE REMOVAL OF
 EXISTING STREET LIGHTS SHALL BE A COST TO THE OWNER.
  
 12. THE PROJECT IS REQUIRED TO COMPLY WITH THE ART IN
 PUBLIC PLACES ORDINANCE.
 13. PRIOR TO THE ISSUANCE OF THE FIRST BUILDING PERMIT,
 THE APPLICANT SHALL PREPARE A CONSTRUCTION SITE
 SECURITY AND MANAGEMENT PLAN FOR APPROVAL BY THE CITY
 OF WEST PALM BEACH POLICE DEPARTMENT CPTED OFFICIAL.
  
 14. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
  
 15. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  
 16. IRRIGATION FOR STREET TREES AND LANDSCAPING IN THE
 RIGHT OF WAYS SHALL BE PROVIDED BY THE APPLICANT,
 SUCCESSORS AND ASSIGNS FROM THE SUBJECT DEVELOPMENT.
 ALL EXISTING CITY IRRIGATION LINES RUNNING TO
 INDIVIDUAL AREAS OR TREES SHALL BE REMOVED AND CAPPED
 IN SUCH A WAY TO ENSURE CITY IRRIGATION SUPPLY LINES
 SHALL REMAIN INTACT AND CONTINUOUS FOR OTHER AREAS
 SERVED BY THE LINES
  
 17. A PHOTOMETRIC PLAN THAT SHOWS LOCATION OF LIGHT
 POLES, AND ILLUSTRATES LOCATION OF TREES SHALL BE
 SUBMITTED AT TIME OF BUILDING PERMIT REVIEW.
 PHOTOMETRICS SHALL INCLUDE PUBLIC OPEN SPACE, ALL
 SIDEWALKS AND PATHS AND PARKING AREAS.
  
 18. SITE LOCATIONS OF GROUND MOUNTED UTILITIES SHALL
 INCLUDE REVIEW BY ZONING.
  
 19. ALL GROUND MOUNTED UTILITIES SHALL BE SCREENED BY
 LANDSCAPING TO THE LARGEST EXTENT POSSIBLE.
  
 20. AN ENCROACHMENT EASEMENT MAY BE REQUIRED FOR THE
 ENCROACHMENT OF BALCONIES INTO THE EDGE MASTER
 ASSOCIATION PROPERTY.
  
 21. THE PROJECT SHALL CONTRIBUTE TO THE TROLLEY FEE DUE
 TO THE INCLUSION OF MICROUNITS, AT A RATE ESTABLISHED
 BY RESOLUTION.
  
 22. THE NECESSARY ELECTRICAL CONNECTIONS WILL BE
 PROVIDED FOR THE MICROMOBILITY STATION PER CITY TRAFFIC
 ENGINEERING REQUIREMENTS.
  
 23. THE GATE AT EGRESS DRIVE SHALL BE OF ARCHITECTURAL
 MATERIAL, NOT JUST A GATE ARM, TO HIDE THE LOADING AREA
 FROM THE ROW.
  
 24. THE TRASH COLLECTION PLAN WILL BE WORKED OUT
 BETWEEN THE OWNER AND EDGE CONDO TO DETERMINE HOW MANY
 TRASH PICKUP DAYS ARE REQUIRED.
  
 25. THE SIDEWALK ELEVATION SHALL BE MAINTAINED ACROSS
 ANY DRIVEWAY.
  
 26. EXTEND THE MEDIAN ON AUSTRALIAN TO PREVENT LEFT
 TURN OUT FROM CLEARWATER ACCESS DRIVE. IF THE EXTENSION
 IS NOT APPROVED BY THE COUNTY, THIS CONDITION WILL NOT
 APPLY.
  
 B. THE FOLLOWING ITEMS SHALL BE ADDRESSED PRIOR TO
 ISSUANCE OF FINAL CO:
 27. PAVEMENT SHALL BE RESURFACED IN ACCORDANCE WITH
 CITY STANDARDS TO ANY AREA WHERE PAVEMENT MARKINGS ARE
 REMOVED.
  
 28. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF
 WAY LANDSCAPING AND IRRIGATION ADJACENT TO THE
 DEVELOPMENT. THIS WILL BE THROUGH A SEPARATE
 MAINTENANCE AGREEMENT WITH THE CITY.
  
  
 LIZ LEVESQUE, URBAN DESIGN PLANNER
  
 PLEASE CONTACT ANA MARIA APONTE, CITY URBAN DESIGNER
 WITH ANY QUESTIONS. [email protected] OR 561 822 1439

Review Stop Z ZONING
Rev No 3 Status F Date 03-22-2021 Cont ID  
Sent By elevesqu Date 03-22-2021 Time 10:34 Rev Time 0.00
Received By elevesqu Date 03-31-2021 Time 13:56 Sent To  
Notes
2021-03-22 10:34:50 
  
 GENERAL COMMENTS:
 1. SATISFIED
 2. SATISFIED. ADDITIONAL INFORMATION IS NECESSARY TO
 MAKE FINAL DETERMINATION OF SITE CALCULATIONS.
 A. SATISFIED. WHAT ARE THE LEGAL PARAMETERS THAT
 REGULATE THE MASTER ASSOCIATION?
 B. SATISFIED. IS DRAINAGE FOR PHASE II ALLOWED WITHIN
 THE MASTER ASSOCIATION AREA? CAN IT BE LOCATION OUTSIDE
 PHASE II PARCEL?
 C. SATISFIED. IS EDGE ASSOCIATION CONSENTING FOR OPEN
 SPACE TO BE OPEN TO THE PUBLIC? ARE THEY AWARE OPEN
 SPACE PERMITS THE PUBLIC TO ENTER?
 D. CONDITION OF APPROVAL: EXTENSION OF BALCONIES INTO
 EDGE ASSOCIATION PROPERTY ? NEED TO CONFIRM IF
 PERMITTED ? EASEMENT SHALL BE REQUIRED
 E. SATISFIED. MEASUREMENT OF SIDE INTERIOR SETBACK AND
 REAR SETBACK DETERMINED BASED ON HOW PROPERTY LINES
 WILL BE MODIFIED WITH PROJECT
 F. SATISFIED. HOW WILL INTERNAL DRIVE BE MAINTAINED AND
 OPERATED?
 3. SATISFIED
 4. ONGOING. CAN EXISTING DRAINAGE BE DISENGAGED?
 STORMWATER DRAINAGE UNDER REVIEW BY CITY ENGINEERING
 DEPARTMENT.
 5. SATISFIED
 6. SATISFIED.
 7. SATISFIED.
 8. SATISIFED.
 9. SATISFIED
 10. SATISFIED
 11. SATISFIED
 12. SATISFIED
 13. SATISFIED
 14. SATISFIED.
 15. SATISFIED
 16. SATISFIED
 17. SATISFIED
 18. SATISFIED
 19. SATISFIED
 20. SATISFIED
 21. SATISFIED
 22. SATISFIED
 23. SATISFIED
 24. SATISFIED
 25. ONGOING ? PARTIALLY SATISFIED. HOW WILL TRASH
 PICKUP WORK FOR NEW BUILDING? WHERE WILL EXISTING TRASH
 FOR EDGE BUILDING BE RELOCATED?
 NEED CONFIRMATION FROM MATT HEJAZI. MAY WANT TO HAVE
 FULL DUMPSTER ENCLOSURE. ONGOING DISCUSSION WITH PUBLIC
 WORKS
 26. SATISFIED.
 27. SATISFIED
 28. SATISFIED
 29. SATISFIED
 30. SATISFIED
 31. SATISFIED.
 32. SATISFIED
 33. SATISFIED.
 34. SATISFIED
 35. SATISFIED
 36. SATISFIED.
 37. SATISFIED
 38. CONDITION OF APPROVAL. PROVIDE PHOTOMETRIC ANALYSIS
 PLANS ? TO INCLUDE PUBLIC OPEN SPACE, ALL BUILDING
 ENTRANCES AND PATHWAYS ? INCLUDING DOG PARK ENTRANCE
 COORDINATED DURING BUILDING PERMIT PROCESS
 LANDSCAPE:
 39. SATISFIED
 40. SATISFIED.
 41. SATISFIED
 42. CONDITION OF APPROVAL. SPECIFIC TYPE OF PUBLIC OPEN
 SPACE AND PRIVATE OPEN SPACE IS REQUIRED. PLEASE
 INCLUDE SPECIFIC TYPE AND TABLES ILLUSTRATING HOW
 REQUIREMENTS FOR SPECIFIC OPEN SPACE TYPES HAVE BEEN
 MET. NEED ADDITIONAL DETAIL TO DETERMINE IF OPEN SPACE
 IS AN IMPROVEMENT ON SITE. THE INITIAL DESIGN DOES NOT
 SEEM TO BE A BIG IMPROVEMENT TO PUBLIC SPACE. NEED TO
 COORDINATE
 DESIGN OF PUBLIC OPEN SPACE TO BE FURTHER REVIEWED, AND
 BROUGHT BACK TO DOWNTOWN ACTION COMMITTEE AT FUTURE
 DATE WITH INCORPORATION OF AIPP REQUIREMENT
 43. SATISFIED.
 44. CONDITION OF APPROVAL. PROVIDE HARDSCAPE PLAN
 ILLUSTRATING PROPOSED CONCEPTUAL PAVERS, FOUNTAIN
 (INCLUDING DEPTH OF FOUNTAIN AND PROTECTIVE BARRIER),
 PAVER BANDING/CONCRETE BANDING, SEATING OPEN SPACE,
 ETC.
 DESIGN OF PUBLIC OPEN SPACE TO BE FURTHER REVIEWED, AND
 BROUGHT BACK TO DOWNTOWN ACTION COMMITTEE AT FUTURE
 DATE WITH INCORPORATION OF AIPP REQUIREMENT
 45. NOT SATISFIED. LANDSCAPE PLAN SHEET PL-1 DOES NOT
 SEEM TO ACCOUNT FOR FIRE, IRRIGATION AND WATER ASSEMBLY
 ADJACENT TO PROPOSED OPEN SPACE ? PLEASE COORDINATE
 WITH CIVIL PLAN
 REPEAT COMMENT ? NOT SHOWN ON LANDSCAPE PLANS: LOW
 SHRUBS CAN BE PLANTED IN FRONT OF FIRE BACKFLOW,
 IRRIGATION METER. FROM PAST CASES, THEY CANNOT BE
 PLANTED IN FRONT OF DOMESTIC BACKFLOW BUT PLEASE
 CONFIRM WITH PUBLIC UTILITIES. THE SIDEWALK BETWEEN
 THESE UTILITIES AND THE BACK OF CURB IS APPROXIMATELY
 12 FEET ? CAN BE REDUCED TO 8 FEET TO ACCOMMODATE
 ADDITIONAL LANDSCAPE IN FRONT OF UTILITIES. PLEASE
 EXAMINE POSSIBILITY AND SEE HOW IT INTERACTS WITH THE
 REST OF THE PROPOSED PUBLIC OPEN SPACE AND SIDEWALK
 ALONG CLEARWATER
 46. SATISFIED
 47. PARTIALLY SATISFIED. ARE TREES PROPOSED ALONG
 CLEARWATER DRIVE IN A LANDSCAPE BED? THIS IS PREFERRED
 IF 8-FOOT SIDEWALK CLEARANCE CAN BE MAINTAINED BETWEEN
 BUILDING FA?ADE AND BED (APPEARS IT CAN)
 TREES SHALL BE PLANTED ALONG CURB LINE IN PLANTER BED
 RATHER THAN FA?ADE PLANTING. CONTINUOUS PLANTER BED CAN
 BE LOCATED ALONG ENTIRE FA?ADE WHERE THERE IS NO
 CROSSWALK OR CURB CUT
 48. SATISFIED
 49. SATISFIED.
 50. NOT SATISFIED. ABOVE GROUND UTILITIES ALONG
 BUILDINGS SOUTH FA?ADE SHALL BE SCREENED WITH LANDSCAPE
 HEDGE TO BEST EXTENT POSSIBLE. PLEASE INCLUDE IN
 LANDSCAPE PLAN
 COORDINATE LANDSCAPE SCREENING AROUND THESE UTILITIES
 WHEN THEY ARE IN THEIR FINAL APPROVED LOCATION. FOR THE
 SAKE OF SITE PLAN REVIEW, PLEASE PLACE LOW LANDSCAPE ON
 ALL SIDES OF THE FDC, FIRE BACKFLOW, IRRIGATION METER,
 AND ON THREE SIDES OF THE WATER METER AND DOMESTIC
 BACKFLOW (CANNOT BE PLANTED ON THE ACCESSED SIDE OF
 WATER METER AND DOMESTIC BACKFLOW). IN THE CASE THAT
 PUBLIC UTILITIES REQUIRES ANY OF THESE UTILITIES TO BE
 LOCATED ON THE ROW (NOT WITHIN PRIVATE PROPERTY),
 PLEASE PLACE UP AGAINST BUILDING WITH FA?ADE PLANTING,
 OR ALONG CURB LINE SURROUNDING BY PLANTING. CONTINUE
 COORDINATION WITH ZONING DEPARTMENT
 51. SATISFIED
 52. SATISFIED.
 53. CONDITION OF APPROVAL. DUE TO THE SITE?S SIZE AND
 THE REQUEST FOR VARIANCES, THIS PROJECT IS SUBJECT TO
 DAC REVIEW PRIOR TO COMPLETING PPRC PROCESS
 PUBLIC OPEN SPACE SUBJECT TO FURTHER DAC REVIEW WITH
 INCORPORATION OF AIPP
 54. CONDITION OF APPROVAL. APPLICANT SHALL MEET AIPP
 REQUIREMENTS ? CONTACT SYBILLE WELTER, AIPP COORDINATOR
 AT [email protected]
 CIVIL:
 55. SATISFIED
 56. SATISFIED.
 57. CONDITION OF APPROVAL. PLEASE NOTE, LOCATION OF ALL
 ABOVE GROUND UTILITIES, INCLUDING BACKFLOW ASSEMBLIES,
 WATER METERS, FDC, FIRE BACKFLOWS, GENERATORS,
 IRRIGATION METERS, ETC. REQUIRE ZONING APPROVAL IN
 COORDINATION WITH PUBLIC WORKS AND CITY ENGINEERING
 DEPARTMENT
 COORDINATION BETWEEN UTILITIES, FIRE, AND ZONING SHALL
 CONTINUE THROUGHOUT CONSTRUCTION PROCESS. ZONING SHALL
 BE INCLUDED IN FINAL LOCATION PLACEMENT
 58. SATISFIED
 59. SATISFIED
 60. SATISFIED
 61. SATISFIED
 62. SATISFIED
 63. NOT SATISFIED. PROVIDE CROSS SECTIONS FOR
 SIDEWALKS, PARALLEL PARKING SPACES, OPEN SPACE AREAS,
 ETC. PLEASE PROVIDE A PARALLEL CUB CUT ACROSS ALL
 PARKING GARAGE ENTRANCES, SHOWING SLOPE OF SIDEWALK
 PROVIDE CROSS SECTION PARALLEL TO CLEARWATER DRIVE,
 ACROSS PARKING GARAGE ENTRANCE THAT SHOWS THE SLOPE OF
 THE SIDEWALK FROM NORTH TO SOUTH AS IT CROSSES THE
 ENTRANCE. SIDEWALK SHALL BE KEPT LEVEL ACROSS ENTRANCE
 64. CONDITION OF APPROVAL. SHOW ALL DOORWAYS ON CIVIL
 PLANS AND INDICATE HOW GRADE CHANGES ARE BEING
 ACCOMMODATED. ALL GRADE CHANGES SHOULD OCCUR INTERIOR
 TO THE BUILDING, NOT ON THE SIDEWALK/ROW
 NEW COMMENTS OCTOBER 30, 2020:
 65. SATISFIED
 ARCHITECTURE:
 66. NOT SATISFIED. IS A GATE PROPOSED AT THE SOUTH
 EGRESS ONLY DRIVE ONTO CLEARWATER? PLEASE INDICATE ON
 SITE PLAN AND ON ARCHITECTURAL PLANS. PLEASE INCLUDE
 MATERIAL DETAIL
 PLEASE PROVIDE ARCHITECTURAL SCREENING GATE NOT JUST
 GATE ARM TO SCREEN LOADING AREA FROM ROW
 67. SATISFIED
 68. CONDITION OF APPROVAL. PLEASE INCLUDE RENDERINGS
 SHOWING INTERACTION OF PUBLIC OPEN SPACE WITH PROPOSED
 BUILDING, AND VIEW FROM NORTHWEST LOOKING SOUTHEAST,
 AND VIEW FROM SOUTH EAST CORNER LOOKING NORTH WEST.
 69. CONDITION OF APPROVAL: PLEASE NOTE, WINDOW MATERIAL
 TINTING SHALL MAINTAIN TRANSPARENCY BETWEEN GROUND
 FLOOR COMMERCIAL SPACES AND EXTERIOR. PLEASE PROVIDE
 MATERIAL SPEC (UNDERSTANDING THIS MAY CHANGE DURING
 PERMIT PROCESS, BUT TRANSPARENCY MUST BE MAINTAINED)
 70. SATISFIED
 71. SATISFIED
 72. SATISFIED
 73. SATISFIED
 74. CONDITION OF APPROVAL: PLEASE INCLUDE AN OPAQUE
 GATE SOMEWHERE APPROPRIATE WITHIN THE SPACE BETWEEN THE
 EDGE AND PROPOSED 350 PROJECT TO SCREEN THE BACK OF
 HOUSE/DUMPSTER STAGING AREA FROM THOSE WITHIN THE
 CIRCULAR DRIVE AND THE PUBLIC VIEW FROM THE ACCESS
 EASEMENT ROADWAY
 75. SATISFIED.
 TRAFFIC:
 76. SATISIFED
 77. SATISFIED.
 LANDSCAPE:
 78. SATISFIED
 79. SATISFIED
 80. CONDITON OF APPROVAL: OVERALL, STAFF FEELS THAT THE
 PUBLIC OPEN SPACE NEEDS TO BE ENHANCED AND BETTER
 DESIGNED TO INTERACT WITH THE EXISTING AND PROPOSED
 BUILDING. A DIFFERENT TYPE OF OPEN SPACE WILL NEED TO
 BE PICKED AND THE CRITERIA MET. STAFF RECOMMENDS A
 CONFERENCE CALL WITH THE LANDSCAPE PLANNER AND URBAN
 DESIGN TO DISCUSS FURTHER
 PUBLIC OPEN SPACE TO BE FURTHER REVIEWED BY DAC WITH
 INCORPORATION OF AIPP REQUIREMENT
 CIVIL/SITE:
 81. SATISFIED
 82. SATISFIED
 83. SATISFIED
 84. ONGOING. ADD LABEL TO PROPOSED STAGING AREA FOR
 TRASH ? CURRENTLY READS AS ONLY STAGING FOR THE EDGE
 TRASH. PLEASE CLARIFY THAT THIS IS ALSO PROPOSED
 STAGING FOR PROPOSED 350 BUILDING. PLEASE ILLUSTRATE
 NUMBER OF COMPACTORS AND RECYCLING BINS THAT CAN FIT
 WITHIN THIS STAGING AREA SAFELY ? USE ACTUAL DIMENSIONS
 OF EDGE COMPACTORS AND PROPOSED 350 COMPACTORS. THIS
 WILL NEED TO BE REVIEWED BY PUBLIC WORKS (MATT HEJAZI)
 WAITING FOR REVIEW BY PUBLIC WORKS
 85. PARTIALLY SATISFIED. CIVIL PLANS APPEAR TO SHOW
 WALL AROUND DUMPSTER STAGING AREA BUT DOES NOT APPEAR
 ON OTHER PLANS. PLEASE CLARIFY
 MIGHT WANT A FULL ENCLOSURE NOT JUST CURB ? CHECK WITH
 MATT HEJAZI
 86. SATISFIED
 87. SATISFIED
 88. SATISFIED
 89. SATISFIED
 90. COA: PLEASE AMEND THE CROSS SECTION A-A TO
 ACCURATELY REFLECT PROPOSED LANDSCAPE AND WALL SEATING
 TO BE REVISED FOR BUILDING PERMIT AFTER PUBLIC OPEN
 SPACE IS APPROVED
 91. SATISFIED
 92. SATISFIED
 93. SATISFIED
 94. SATISIFIED
  
 PROPOSED CONDITIONS OF APPROVAL:
 1. ALL PORTIONS OF THE PARKING GARAGE SHALL BE PAINTED
 (CEILING AND WALLS INCLUDING ANY UTILITIES AND PIPING)
 TO A DEPTH OF 20 FEET. ALL PARKING GARAGE LIGHTING
 SHALL BE SHIELDED
 2. PLEASE NOTE, ALL PROJECTS WITH MICROUNITS SHALL
 CONTRIBUTE TO THE CITY TROLLEY FUND AT A RATE OF $10
 PER MICROUNIT PER MONTH
 3. ALL ROOFTOP EQUIPMENT SHALL BE SCREENED TO THE
 HEIGHT OF THE EQUIPMENT. ALL WALL MOUNTED EQUIPMENT
 SHALL BE ARCHITECTURALLY SCREENED OR PAINTED TO MATCH
 BUILDING FA?ADE
 4. ALL GRADE CHANGES SHOULD OCCUR INTERIOR TO THE
 BUILDING, NOT ON THE SIDEWALK/ROW
 5. EXACT AMOUNT OF CAR SHARE SPACES OR NEED FOR ANY TO
 BE DETERMINED THROUGHOUT BUILDING PERMIT PROCESS
 6. EASEMENT REQUIRED FOR EXTENSION OF BALCONIES INTO
 EDGE MASTER ASSOCIATION PROPERTY
 7. DETAILS OF PROPOSED DOG PARK TO BE COORDINATED
 DURING BUILDING PERMIT PROCESS. STAFF RECOMMENDS
 ANALYZING PROPOSED ENTRANCE TO DOG PARK. LOOKS LIKE THE
 ONLY WAY TO GET THERE IS THROUGH THE CORRIDOR THAT GOES
 IN FRONT OF THE GENERATOR ROOMS OR HAVING TO WALK
 THROUGH THE ASPHALT DUMPSTER STAGING AREA. NOT A ZONING
 REQUIREMENT BUT A RECOMMENDATION FOR THE TENANT?S
 ENJOYMENT
 8. PROVIDE PHOTOMETRIC ANALYSIS PLANS ? TO INCLUDE
 PUBLIC OPEN SPACE, ALL BUILDING ENTRANCES AND PATHWAYS
 ? INCLUDING DOG PARK ENTRANCE
 9. DESIGN OF PUBLIC OPEN SPACE TO BE FURTHER REVIEWED,
 AND BROUGHT BACK TO DOWNTOWN ACTION COMMITTEE AT FUTURE
 DATE WITH INCORPORATION OF AIPP REQUIREMENT
 A. PLEASE INCLUDE RENDERINGS SHOWING INTERACTION OF
 PUBLIC OPEN SPACE WITH PROPOSED BUILDING, AND VIEW FROM
 NORTHWEST LOOKING SOUTHEAST, AND VIEW FROM SOUTH EAST
 CORNER LOOKING NORTH WEST.
 B. PLEASE AMEND THE CROSS SECTION A-A TO ACCURATELY
 REFLECT PROPOSED LANDSCAPE AND WALL SEATING
 10. PLEASE NOTE, WINDOW MATERIAL TINTING SHALL MAINTAIN
 TRANSPARENCY BETWEEN GROUND FLOOR COMMERCIAL SPACES AND
 EXTERIOR. PLEASE PROVIDE MATERIAL SPEC WITH BUILDING
 PERMIT
 11. PLEASE INCLUDE AN OPAQUE GATE SOMEWHERE APPROPRIATE
 WITHIN THE SPACE BETWEEN THE EDGE AND PROPOSED 350
 PROJECT TO SCREEN THE BACK OF HOUSE/DUMPSTER STAGING
 AREA FROM THOSE WITHIN THE CIRCULAR DRIVE AND THE
 PUBLIC VIEW FROM THE ACCESS EASEMENT ROADWAY
 SEE OTHER DEPARTMENT COMMENTS FOR ADDITIONAL STANDARD
 PROPOSED PROVISOS
  
 LIZ LEVESQUE, URBAN DESIGN PLANNER
 561 822 1426
 [email protected]
  
 ANA MARIA APONTE, CITY URBAN DESIGNER
 561 822 1439
 [email protected]

Review Stop Z ZONING
Rev No 2 Status F Date 10-30-2020 Cont ID  
Sent By elevesqu Date 10-30-2020 Time 12:32 Rev Time 0.00
Received By elevesqu Date 10-30-2020 Time 12:31 Sent To  
Notes
2020-10-30 12:32:24 
  
 GENERAL COMMENTS:
 1. SATISFIED
 2. ONGOING DISCUSSION WITH APPLICANT LEGAL TEAM AND
 CITY. ADDITIONAL INFORMATION IS NECESSARY TO MAKE FINAL
 DETERMINATION OF SITE CALCULATIONS.
 A. WHAT ARE THE LEGAL PARAMETERS THAT REGULATE THE
 MASTER ASSOCIATION?
 B. IS DRAINAGE FOR PHASE II ALLOWED WITHIN THE MASTER
 ASSOCIATION AREA? CAN IT BE LOCATION OUTSIDE PHASE II
 PARCEL?
 C. IS EDGE ASSOCIATION CONSENTING FOR OPEN SPACE TO BE
 OPEN TO THE PUBLIC? ARE THEY AWARE OPEN SPACE PERMITS
 THE PUBLIC TO ENTER?
 D. EXTENSION OF BALCONIES INTO EDGE ASSOCIATION
 PROPERTY ? NEED TO CONFIRM IF PERMITTED
 E. MEASUREMENT OF SIDE INTERIOR SETBACK AND REAR
 SETBACK DETERMINED BASED ON HOW PROPERTY LINES WILL BE
 MODIFIED WITH PROJECT
 F. HOW WILL INTERNAL DRIVE BE MAINTAINED AND OPERATED?
 3. PARTIALLY SATISFIED
 REMOVE ACTIVE USE, TRANSPARENCY DATA FOR THE EDGE. ONLY
 DATA FOR THE ENTIRE SITE TO REMAIN IS THE PUBLIC OPEN
 SPACE. PLEASE UPDATE FAR DATA LABEL FOR SUBJECT PARCEL
 TO ?350? (CURRENTLY READS ?305?)
 4. ONGOING. CAN EXISTING DRAINAGE BE DISENGAGED?
 STORMWATER DRAINAGE UNDER REVIEW BY CITY ENGINEERING
 DEPARTMENT.
 5. SATISFIED
 6. PARTIALLY SATISFIED. SHEET A ? 0.01
 A. SATISFIED. LABEL STREET NAMES ASSOCIATED WITH THEIR
 DESIGNATIONS UNDER MIN. ACTIVE USE TABLE
 B. SATISFIED. INCLUDE ACTUAL PROVIDED SETBACK FOR SIDE
 INTERIOR SOUTH
 C. SEE NEW COMMENT #70 INCLUDE VARIANCE TABLE FOR
 PROPOSED VARIANCES. PLEASE NOTE, SETBACK FOR GROUND
 FLOOR, PODIUM AND TOWER ARE THREE SEPARATE VARIANCE
 REQUESTS
 D. SATISFIED. MINIMUM GUEST PARKING FOR MICROUNITS IS
 1/20 NOT 0, PLEASE UPDATE IN TABLE
 7. SATISFIED.
 8. SATISIFED. THE TOTAL AMOUNT OF CAR-SHARE STATIONS
 MAY BE REDUCED BY ONE CAR-SHARE STATION PER EVERY 13
 ON-SITE PARKING SPACES PROVIDED. CAR SHARE STATIONS CAN
 BE REDUCED BY NUMBER OF PARKING SPACES PROVIDED FOR THE
 MICROUNITS. DEDUCTION BASED ON CURRENT NUMBERS WOULD BE
 9 SPACES, RESULTING IN A NEED FOR 9 CAR SHARE SPACES.
 EXACT AMOUNT OF CAR SHARE SPACES OR NEED FOR ANY TO BE
 DETERMINED THROUGHOUT BUILDING PERMIT PROCESS
 9. SATISFIED
 10. SATISFIED
 11. SATISFIED
 12. SATISFIED
 13. SATISFIED
 14. PARTIALLY SATISFIED. REDUCE NUMBER OF DRIVEWAY AND
 CURB CUTS FROM PROJECT. ELIMINATE FROM CLEARWATER DRIVE
 IF POSSIBLE. NO MORE THAN ONE ON CLEARWATER IF ALL
 CANNOT BE ELIMINATED. REDUCE INTERNAL TO TWO LANES ONLY
 CAN THE APRON WIDTH BE REDUCED? PLEASE CHECK ? SEEM
 WIDER THAN NECESSARY
 15. SATISFIED
 16. SATISFIED
 17. SATISFIED
 18. SATISFIED
 19. SATISFIED
 20. SATISFIED
 21. SATISFIED
 22. SATISFIED
 23. SATISFIED
 24. PARTIALLY SATISFIED: SHOW ADJACENT PROPERTY CURB
 LINES, PARKING LOTS, STRUCTURES ETC. ON SITE PLAN AND
 CIVIL PLANS
 NOT SHOWN ON CIVIL PLANS
 25. PARTIALLY SATISFIED. HOW WILL TRASH PICKUP WORK FOR
 NEW BUILDING? WHERE WILL EXISTING TRASH FOR EDGE
 BUILDING BE RELOCATED?
 NEED TO HAVE DISCUSSION WITH EDGE BUILDING FOR THEIR
 CURRENT STORAGE TO CONFIRM. NEED CONVERSATION WITH MATT
 HEJAZI OF PUBLIC WORKS TO CONFIRM TRUCK ENTRY ON PAVED
 CIRCULAR DRIVE
 26. SATISFIED.
 27. SATISFIED
 28. SATISFIED
 29. SATISFIED
 30. SATISFIED
 31. NOT SATISFIED. PLEASE SUBMIT COLOR RENDERINGS FROM
 GROUND VIEW PERSPECTIVE. INCLUDE LANDSCAPE AS PROPOSED,
 AT PLANTING HEIGHT FOR ACCURATE CONSTRUCTION
 REPRESENTATION.
 32. SATISFIED
 33. PARTIALLY SATISFIED. PLEASE SUBMIT CONTEXTUAL
 ELEVATIONS
 NEED MORE DETAILED CONTEXTUAL ELEVATIONS AND RENDERINGS
 34. SATISFIED
 35. SATISFIED
 36. PARTIALLY SATISFIED. WHERE IS THE ACCESS TO THE DOG
 PARK PROPOSED? WILL IT CONNECT TO CLEARWATER DRIVE?
 PLEASE PROVIDE MORE DETAIL
 LOCATION IS FINE, HOWEVER NEED TO CONFIRM THAT EDGE
 BUILDING HAS ALTERNATIVE MEANS TO TRANSPORT TRASH BINS
 TO STAGING AREA. NEED TO CONFIRM THIS ARRANGEMENT WILL
 WORK FOR ALL PARTIES INVOLVED
 37. SATISFIED
 38. CONDITION OF APPROVAL. PROVIDE PHOTOMETRIC ANALYSIS
 PLANS ? TO INCLUDE PUBLIC OPEN SPACE, ALL BUILDING
 ENTRANCES AND PATHWAYS ? INCLUDING DOG PARK ENTRANCE
 COORDINATED DURING BUILDING PERMIT PROCESS
 LANDSCAPE:
 39. SATISFIED
 40. PARTIALLY SATISFIED. EXISTING OAK TREES ALONG
 CLEARWATER DRIVE MAY BE ABLE TO BE RELOCATED TO
 PLANTING BED CLOSER TO CURB- SEE LANDSCAPE COMMENTS.
 NEED TO COORDINATE WITH ENGINEERING FOR UTILITY LINE
 PLACEMENT
 PROPOSED TREES SHALL BE ALONG CURB LINE AS SEWER LINE
 IS BEING RELOCATED
 41. SATISFIED
 42. PARTIALLY SATISFIED. SPECIFIC TYPE OF PUBLIC OPEN
 SPACE AND PRIVATE OPEN SPACE IS REQUIRED. PLEASE
 INCLUDE SPECIFIC TYPE AND TABLES ILLUSTRATING HOW
 REQUIREMENTS FOR SPECIFIC OPEN SPACE TYPES HAVE BEEN
 MET. NEED ADDITIONAL DETAIL TO DETERMINE IF OPEN SPACE
 IS AN IMPROVEMENT ON SITE. THE INITIAL DESIGN DOES NOT
 SEEM TO BE A BIG IMPROVEMENT TO PUBLIC SPACE. NEED TO
 COORDINATE
 PASSAGEWAY OPEN SPACE DOES NOT WORK FOR THIS SITE. THIS
 LOCATION OF PUBLIC OPEN SPACE DOES NOT MEET THE
 DEFINITION OF PASSAGEWAY FROM SECTION 94-109.
 43. CONDITIONALLY SATISFIED. PLEASE PRESERVE THE TWO
 TREES THAT EXIST ON THE WEST SIDE OF THE DRY RETENTION
 AREA (NEW PROPOSED OPEN SPACE) BY MEANS OF ISLANDS OR
 SHIFTING/REMOVING SOME PARKING SPACES
 SATISFIED AS LONG AS RAY CARANCI HAS DETERMINED THAT
 THE TREES ARE NOT WORTH PRESERVING.
 44. PARTIALLY SATISFIED. PROVIDE HARDSCAPE PLAN
 ILLUSTRATING PROPOSED CONCEPTUAL PAVERS, FOUNTAIN
 (INCLUDING DEPTH OF FOUNTAIN AND PROTECTIVE BARRIER),
 PAVER BANDING/CONCRETE BANDING, SEATING OPEN SPACE,
 ETC.
 NEED TO SEE MATERIAL EXAMPLES AND DETAILS FOR PAVERS,
 BANDING, ETC. REQUIRED PRIOR TO DAC (STAFF UNDERSTANDS
 EXACT COLOR AND MATERIAL CHOICES MAY BE MODIFIED
 THROUGHOUT BUILDING PERMIT PROCESS, BUT A CONCEPT IS
 NEEDED)
 45. PARTIALLY SATISFIED. LANDSCAPE PLAN SHEET PL-1 DOES
 NOT SEEM TO ACCOUNT FOR FIRE, IRRIGATION AND WATER
 ASSEMBLY ADJACENT TO PROPOSED OPEN SPACE ? PLEASE
 COORDINATE WITH CIVIL PLAN
 LOW SHRUBS CAN BE PLANTED IN FRONT OF FIRE BACKFLOW,
 IRRIGATION METER. FROM PAST CASES, THEY CANNOT BE
 PLANTED IN FRONT OF DOMESTIC BACKFLOW BUT PLEASE
 CONFIRM WITH PUBLIC UTILITIES. THE SIDEWALK BETWEEN
 THESE UTILITIES AND THE BACK OF CURB IS APPROXIMATELY
 12 FEET ? CAN BE REDUCED TO 8 FEET TO ACCOMMODATE
 ADDITIONAL LANDSCAPE IN FRONT OF UTILITIES. PLEASE
 EXAMINE POSSIBILITY AND SEE HOW IT INTERACTS WITH THE
 REST OF THE PROPOSED PUBLIC OPEN SPACE AND SIDEWALK
 ALONG CLEARWATER
 46. SATISFIED
 47. PARTIALLY SATISFIED. ARE TREES PROPOSED ALONG
 CLEARWATER DRIVE IN A LANDSCAPE BED? THIS IS PREFERRED
 IF 8-FOOT SIDEWALK CLEARANCE CAN BE MAINTAINED BETWEEN
 BUILDING FA?ADE AND BED (APPEARS IT CAN)
 TREES SHALL BE PLANTED ALONG CURB LINE IN PLANTER BED
 RATHER THAN FA?ADE PLANTING. CONTINUOUS PLANTER BED CAN
 BE LOCATED ALONG ENTIRE FA?ADE WHERE THERE IS NO
 CROSSWALK OR CURB CUT
 48. SATISFIED
 49. PARTIALLLY SATISFIED. CANNOT DETERMINE IF TREES ON
 NORTH SIDE OF PUBLIC OPEN SPACE ARE EXISTING. STAFF
 DOES NOT WANT THE EXISTING MATURE TREES AT THIS
 LOCATION REMOVED
 CAN TREES K AND L BE PRESERVED? THEY DON?T SEEM TO NEED
 TO BE REMOVED
 50. NOT SATISFIED. ABOVE GROUND UTILITIES ALONG
 BUILDINGS SOUTH FA?ADE SHALL BE SCREENED WITH LANDSCAPE
 HEDGE TO BEST EXTENT POSSIBLE. PLEASE INCLUDE IN
 LANDSCAPE PLAN
 COORDINATE LANDSCAPE SCREENING AROUND THESE UTILITIES
 WHEN THEY ARE IN THEIR FINAL APPROVED LOCATION. FOR THE
 SAKE OF SITE PLAN REVIEW, PLEASE PLACE LOW LANDSCAPE ON
 ALL SIDES OF THE FDC, FIRE BACKFLOW, IRRIGATION METER,
 AND ON THREE SIDES OF THE WATER METER AND DOMESTIC
 BACKFLOW (CANNOT BE PLANTED ON THE ACCESSED SIDE OF
 WATER METER AND DOMESTIC BACKFLOW). IN THE CASE THAT
 PUBLIC UTILITIES REQUIRES ANY OF THESE UTILITIES TO BE
 LOCATED ON THE ROW (NOT WITHIN PRIVATE PROPERTY),
 PLEASE PLACE UP AGAINST BUILDING WITH FA?ADE PLANTING,
 OR ALONG CURB LINE SURROUNDING BY PLANTING. CONTINUE
 COORDINATION WITH ZONING DEPARTMENT
 51. SATISFIED
 52. SATISFIED.
 53. ONGOING. DUE TO THE SITE?S SIZE AND THE REQUEST FOR
 VARIANCES, THIS PROJECT IS SUBJECT TO DAC REVIEW PRIOR
 TO COMPLETING PPRC PROCESS
 54. ONGOING. APPLICANT SHALL MEET AIPP REQUIREMENTS ?
 CONTACT SYBILLE WELTER, AIPP COORDINATOR AT
 [email protected]
 CIVIL:
 55. PARTIALLY SATISFIED. MAINTAIN AND ENHANCE
 CONNECTION FROM PROPOSED PUBLIC OPEN SPACE TO MULTI
 MODAL CENTER THROUGH ADA RAMP AND CROSSWALK
 PLEASE INDICATE EXISTING CROSSWALK AND MAINTAINED
 CONNECTION ON PLANS
 56. PARTIALLY SATISFIED. DO NOT SEE DETAIL FOR WS-8
 WATER METER OR WS-11 IRRIGATION METER AS LABELED ON
 SHEET C-03
 SHEET C-12 NOT INCLUDED WITH SUBMITTAL PACKAGE
 57. ONGOING. PLEASE NOTE, LOCATION OF ALL ABOVE GROUND
 UTILITIES, INCLUDING BACKFLOW ASSEMBLIES, WATER METERS,
 FDC, FIRE BACKFLOWS, GENERATORS, IRRIGATION METERS,
 ETC. REQUIRE ZONING APPROVAL IN COORDINATION WITH
 PUBLIC WORKS AND CITY ENGINEERING DEPARTMENT
 IRRIGATION METER ON PRIVATE PROPERTY. LOCATE GATE
 VALVES OFF OF PUBLIC SIDEWALK AREA. CAN DCDA BE LOCATED
 FURTHER WEST TO PROVIDE FOR LANDSCAPE SCREENING BETWEEN
 SIDEWALK AND DCDA? SAME FOR IRRIGATION RPZ? IN THE CASE
 THAT PUBLIC UTILITIES REQUIRE ANY OF THESE UTILITIES TO
 BE LOCATED ON THE ROW (NOT WITHIN PRIVATE PROPERTY),
 PLEASE PLACE UP AGAINST BUILDING WITH FA?ADE PLANTING,
 OR ALONG CURB LINE SURROUNDING BY PLANTING. CONTINUE
 COORDINATION WITH ZONING DEPARTMENT
  
 58. SATISFIED
 59. SATISFIED
 60. SATISFIED
 61. SATISFIED
 62. SATISFIED
 63. PARTIALLY SATISFIED. PROVIDE CROSS SECTIONS FOR
 SIDEWALKS, PARALLEL PARKING SPACES, OPEN SPACE AREAS,
 ETC. PLEASE PROVIDE A PARALLEL CUB CUT ACROSS ALL
 PARKING GARAGE ENTRANCES, SHOWING SLOPE OF SIDEWALK
 STAFF WAS NOT CLEAR ? MEANT TO ASK FOR A CROSS SECTION
 ACROSS THE PARKING GARAGE THAT IS PARALLEL TO
 CLEARWATER, NOT PARALLEL TO THE GARAGE ENTRANCE DRIVE
 64. CONDITION OF APPROVAL. SHOW ALL DOORWAYS ON CIVIL
 PLANS AND INDICATE HOW GRADE CHANGES ARE BEING
 ACCOMMODATED. ALL GRADE CHANGES SHOULD OCCUR INTERIOR
 TO THE BUILDING, NOT ON THE SIDEWALK/ROW
 TO ENSURE THAT THIS IS MAINTAINED, WILL BE A CONDITION
 OF APPROVAL FOR BUILDING PERMIT REVIEW
 NEW COMMENTS OCTOBER 30, 2020:
 65. SCAD SHALL BE APPROVED PRIOR TO SITE PLAN APPROVAL.
 ARCHITECTURE:
 66. IS A GATE PROPOSED AT THE SOUTH EGRESS ONLY DRIVE
 ONTO CLEARWATER? PLEASE INDICATE ON SITE PLAN AND ON
 ARCHITECTURAL PLANS. PLEASE INCLUDE MATERIAL DETAIL
 67. IS A GATE PROPOSED FOR THE ACCESS TO THE PARKING
 GARAGE? THE RETAIL/COMMERCIAL PARKING SPACES WILL NEED
 TO BE ACCESSIBLE BY THE GENERAL PUBLIC. PLEASE EXPLAIN
 HOW THIS WILL WORK
 68. PLEASE INCLUDE RENDERINGS SHOWING INTERACTION OF
 PUBLIC OPEN SPACE WITH PROPOSED BUILDING, AND VIEW FROM
 NORTHWEST LOOKING SOUTHEAST, AND VIEW FROM SOUTH EAST
 CORNER LOOKING NORTH WEST.
 69. PLEASE NOTE, WINDOW MATERIAL TINTING SHALL MAINTAIN
 TRANSPARENCY BETWEEN GROUND FLOOR COMMERCIAL SPACES AND
 EXTERIOR. PLEASE PROVIDE MATERIAL SPEC (UNDERSTANDING
 THIS MAY CHANGE DURING PERMIT PROCESS, BUT TRANSPARENCY
 MUST BE MAINTAINED)
 70. PLEASE UPDATE VARIANCE TABLE TO REFLECT TWO
 VARIANCES ? NOT THREE (ONE FOR GROUND FLOOR AND PODIUM,
 ONE FOR PARKING ABOVE 7TH FLOOR)
 71. DOG PARK STILL LABELED ON ARCHITECTURAL PLANS ON
 SIDE INTERIOR LOT LINE
 72. WHAT IS THE FUNCTION OF THE 16?6? SPACE ON NORTH
 SIDE OF NORTH DRIVEWAY ON CLEARWATER? CAN RETAIL SPACE
 BE EXTENDED HERE
 73. SOME OF THE CONCRETE FINS COULD BE REMOVED IN ORDER
 TO BETTER REFLECT PLANAR BREAKS AS THEY ARE PROPOSED IN
 THE EXHIBIT. PLEASE SCHEDULE A CALL WITH URBAN DESIGN
 TEAM TO DISCUSS
 74. PLEASE INCLUDE AN OPAQUE GATE SOMEWHERE APPROPRIATE
 WITHIN THE SPACE BETWEEN THE EDGE AND PROPOSED 350
 PROJECT TO SCREEN THE BACK OF HOUSE/DUMPSTER STAGING
 AREA FROM THOSE WITHIN THE CIRCULAR DRIVE AND THE
 PUBLIC VIEW FROM THE ACCESS EASEMENT ROADWAY
 75. STAFF RECOMMENDS ANALYZING PROPOSED ENTRANCE TO DOG
 PARK. LOOKS LIKE THE ONLY WAY TO GET THERE IS THROUGH
 THE CORRIDOR THAT GOES IN FRONT OF THE GENERATOR ROOMS
 OR HAVING TO WALK THROUGH THE ASPHALT DUMPSTER STAGING
 AREA. NOT A ZONING REQUIREMENT BUT A RECOMMENDATION FOR
 THE TENANT?S ENJOYMENT
 TRAFFIC:
 76. PLEASE UPDATE TRAFFIC STUDY ? NO LONGER LEFT TURN
 IN TO SOUTH EGRESS DRIVE AND UPDATE IF ONLY FOR LOADING
 EGRESS (NO LONGER FOR OTHER VEHICULAR EGRESS)
 LANDSCAPE:
 77. OAK TREE PROPOSED VERY CLOSE TO FIRE HYDRANT AT
 CIRCULAR PARKING ROW LANDSCAPE ISLAND. IS THIS TOO
 CLOSE?
 78. STREET TREES ALONG CURB LINE SHALL BE 20-FOOT
 PLANTING HEIGHT
 79. OVERALL, STAFF FEELS THAT THE PUBLIC OPEN SPACE
 NEEDS TO BE ENHANCED AND BETTER DESIGNED TO INTERACT
 WITH THE EXISTING AND PROPOSED BUILDING. A DIFFERENT
 TYPE OF OPEN SPACE WILL NEED TO BE PICKED AND THE
 CRITERIA MET. STAFF RECOMMENDS A CONFERENCE CALL WITH
 THE LANDSCAPE PLANNER AND URBAN DESIGN TO DISCUSS
 FURTHER
 CIVIL/SITE:
 80. PUBLIC BICYCLE RACK ON CLEARWATER OUTSIDE
 COMMERCIAL SPACE, PLEASE REORIENT TO BE PARALLEL WITH
 BUILDING TO FIT 6-FOOT-LONG BICYCLES (LEAVE 24? FROM
 BUILDING FA?ADE)
 81. RE-LABEL GROUND FLOOR UNITS FROM RESIDENTIAL TO
 LIVE/WORK TO MATCH SITE PLAN
 82. PROPOSED CURBING OUTSIDE PARKING GARAGE ENTRANCES
 ON CLEARWATER DRIVE PREVENT CLEAR SIDEWALK PATH (IF
 THIS IS A SIDEWALK ALONG THE BUILDING FA?ADE) LEADING
 TO DOG PARK. SUGGEST PROVIDING FLUSH SIDEWALK WITH
 GARAGE ENTRANCES
 83. ADD LABEL TO PROPOSED STAGING AREA FOR TRASH ?
 CURRENTLY READS AS ONLY STAGING FOR THE EDGE TRASH.
 PLEASE CLARIFY THAT THIS IS ALSO PROPOSED STAGING FOR
 PROPOSED 350 BUILDING. PLEASE ILLUSTRATE NUMBER OF
 COMPACTORS AND RECYCLING BINS THAT CAN FIT WITHIN THIS
 STAGING AREA SAFELY ? USE ACTUAL DIMENSIONS OF EDGE
 COMPACTORS AND PROPOSED 350 COMPACTORS. THIS WILL NEED
 TO BE REVIEWED BY PUBLIC UTILITIES (MATT HEJAZI)
 84. CIVIL PLANS APPEAR TO SHOW WALL AROUND DUMPSTER
 STAGING AREA BUT DOES NOT APPEAR ON OTHER PLANS. PLEASE
 CLARIFY
 85. CIVIL SHEET C-08 ILLUSTRATES VAULT THOUGH LABELED
 TO REMOVE ON SHEET C-03. PLEASE CLARIFY
 86. PLEASE REMOVE PUMP HOUSE OUTLINE ON SHEET C-08 AND
 LIGHT POLE THAT IS CURRENTLY LOCATED AT EXISTING OPEN
 SPACE?S ENTRANCE FROM CLEARWATER DRIVE (IF BEING
 REMOVED)
 87. CAN PROPOSED SSMH #2 BE LOCATED OFF OF THE PUBLIC
 SIDEWALK? ARE TWO MANHOLES SO CLOSE TO EACH OTHER (SSMH
 #2 AND SSMH #1 NECESSARY OR CAN ONE BE REMOVED OR
 RELOCATED?
 88. PLEASE REMOVE TRUNCATED DOMES AT PARKING GARAGE
 ENTRANCES ON CLEARWATER. ONLY INCLUDE AT ROADWAY
 INTERSECTIONS (PER CITY TRAFFIC ENGINEERING DEPT.)
 89. PLEASE AMEND THE CROSS SECTION A-A TO ACCURATELY
 REFLECT PROPOSED LANDSCAPE AND WALL SEATING
 90. PLEASE MATCH WIDTH OF CURB CUTS AND APRONS WITH
 SITE PLAN
 91. CONTINUE 8 FOOT SIDEWALK ENTIRE LENGTH OF PROPERTY
 AND TRANSITION OUTSIDE PROPERTY (AT PROJECTS SOUTHEAST
 SIDE)
  
 PROPOSED CONDITIONS OF APPROVAL:
 92. ALL PORTIONS OF THE PARKING GARAGE SHALL BE PAINTED
 (CEILING AND WALLS INCLUDING ANY UTILITIES AND PIPING)
 TO A DEPTH OF 20 FEET. ALL PARKING GARAGE LIGHTING
 SHALL BE SHIELDED
 93. PLEASE NOTE, ALL PROJECTS WITH MICROUNITS SHALL
 CONTRIBUTE TO THE CITY TROLLEY FUND AT A RATE OF $10
 PER MICROUNIT PER MONTH
 94. ALL ROOFTOP EQUIPMENT SHALL BE SCREENED TO THE
 HEIGHT OF THE EQUIPMENT. ALL WALL MOUNTED EQUIPMENT
 SHALL BE ARCHITECTURALLY SCREENED OR PAINTED TO MATCH
 BUILDING FA?ADE
 95. ALL GRADE CHANGES SHOULD OCCUR INTERIOR TO THE
 BUILDING, NOT ON THE SIDEWALK/ROW
 96. TRANSPARENCY MUST BE MAINTAINED THROUGH CHOICE OF
 GLASS FOR WINDOWS ALONG GROUND FLOOR
 SEE OTHER DEPARTMENT COMMENTS FOR ADDITIONAL STANDARD
 PROPOSED PROVISOS
  
  
 LIZ LEVESQUE, URBAN DESIGN PLANNER
 561 822 1426
 [email protected]

Review Stop Z ZONING
Rev No 1 Status F Date 09-04-2020 Cont ID  
Sent By elevesqu Date 09-04-2020 Time 10:14 Rev Time 0.00
Received By elevesqu Date 09-04-2020 Time 10:13 Sent To  
Notes
2020-09-04 10:15:02 
 GENERAL COMMENTS:
  
 1. CHANGE ?INFORMAL? TO ?FORMAL? ON COVER SHEET
 2. ADDITIONAL INFORMATION IS NECESSARY TO MAKE FINAL
 DETERMINATION OF SITE CALCULATIONS.
 A. WHAT ARE THE LEGAL PARAMETERS THAT REGULATE THE
 MASTER ASSOCIATION?
 B. . IS DRAINAGE FOR PHASE II ALLOWED WITHIN THE MASTER
 ASSOCIATION AREA? CAN IT BE LOCATION OUTSIDE PHASE II
 PARCEL?
 C. IS EDGE ASSOCIATION CONSENTING FOR OPEN SPACE TO BE
 OPEN TO THE PUBLIC? ARE THEY AWARE OPEN SPACE PERMITS
 THE PUBLIC TO ENTER?
 D. EXTENSION OF BALCONIES INTO EDGE ASSOCIATION
 PROPERTY ? NEED TO CONFIRM IF PERMITTED
 E. MEASUREMENT OF SIDE INTERIOR SETBACK AND REAR
 SETBACK DETERMINED BASED ON HOW PROPERTY LINES WILL BE
 MODIFIED WITH PROJECT
 F. HOW WILL INTERNAL DRIVE BE MAINTAINED AND OPERATED?
 3. NEED TO DETERMINE BEST WAY TO ORGANIZE SITE DATA FOR
 CLARITY THAT ALTHOUGH SEPARATE OWNERSHIP AND SEPARATE
 PROJECT, THIS IS CONSIDERED AN AMENDMENT TO THE EDGE
 PHASE II PROJECT
 4. CAN EXISTING DRAINAGE BE DISENGAGED?
 5. NEED TO DETERMINE WHETHER BALCONY ENCROACHMENT INTO
 SIDE INTERIOR SETBACK SHALL COUNT TOWARDS REQUEST FOR
 SETBACK VARIANCE
 6. SHEET A ? 0.01
 A. LABEL STREET NAMES ASSOCIATED WITH THEIR
 DESIGNATIONS UNDER MIN. ACTIVE USE TABLE
 B. INCLUDE ACTUAL PROVIDED SETBACK FOR SIDE INTERIOR
 SOUTH
 C. INCLUDE VARIANCE TABLE FOR PROPOSED VARIANCES.
 PLEASE NOTE, SETBACK FOR GROUND FLOOR, PODIUM AND TOWER
 ARE THREE SEPARATE VARIANCE REQUESTS
 D. MINIMUM GUEST PARKING FOR MICROUNITS IS 1/20 NOT 0,
 PLEASE UPDATE IN TABLE
 7. IS TENANT STORAGE UNDER FULLY ENCLOSED AND/OR AC?
 ONLY COUNTS TOWARDS FAR IF IT IS FULLY ENCLOSED AND/OR
 UNDER AC
 8. THE TOTAL AMOUNT OF CAR-SHARE STATIONS MAY BE
 REDUCED BY ONE CAR-SHARE STATION PER EVERY 13 ON-SITE
 PARKING SPACES PROVIDED. CAR SHARE STATIONS CAN BE
 REDUCED BY NUMBER OF PARKING SPACES PROVIDED FOR THE
 MICROUNITS. DEDUCTION BASED ON CURRENT NUMBERS WOULD BE
 9 SPACES, RESULTING IN A NEED FOR 9 CAR SHARE SPACES.
 9. FOR STANDARD UNITS, GUEST PARKING AT 1/20 UNITS
 WOULD REQUIRE 9 GUEST PARKING, NOT 10. PLEASE UPDATE
 10. PLEASE REDUCE AMOUNT OF PARKING SPACES AROUND
 CIRCULAR DRIVE ? STAFF WISHES TO PRESERVE EXISTING ON
 SITE TREES AND REDUCE THE AMOUNT OF SURFACE PARKING
 SPACES, ESPECIALLY IF PARALLEL PARKING ON CLEARWATER
 DRIVE WILL BE UTILIZED FOR RIDE SHARE AND CAR SHARE
 11. ARE THE PARKING SPACES AROUND CIRCULAR DRIVE BEING
 COUNTED TOWARDS PROJECT?S PARKING? ? NEED TO CONFIRM
 HOW IF OFF SITE. PLEASE SEPARATE IN PARKING DATA TABLE
 AND INCLUDE SEPARATE LINE FOR PARALLEL PARKING
 12. PLEASE SHOW DOUBLE STRIPING OF PARKING SPACES
 WITHIN PARKING GARAGE AND CONFIRM COMPLIANCE WITH
 ADDITIONAL WIDTH WHEN ADJACENT TO WALLS.
 13. NUMBER OF PARKING SPACES ON 2ND FLOOR DOES NOT
 INCLUDE PARKING RAMP, PLEASE AMEND (SHEET A1.01)
 14. REDUCE NUMBER OF DRIVEWAY AND CURB CUTS FROM
 PROJECT. ELIMINATE FROM CLEARWATER DRIVE IF POSSIBLE.
 NO MORE THAN ONE ON CLEARWATER IF ALL CANNOT BE
 ELIMINATED. REDUCE INTERNAL TO TWO LANES ONLY
 15. CLEARLY INDICATE WHERE 6% SLOPE ENDS AND 12.5%
 SLOPE BEGINS ON RAMP FROM 2ND TO 3RD FLOOR AND CHECK TO
 MAKE SURE THERE ARE NO PARKING SPACES ON 12.5% SLOPE
 16. PLEASE CLARIFY WHERE 8TH LEVEL OF PARKING GARAGE
 ENDS. APPEARS TO BE A WALL ABOVE RAMP FROM 7TH TO 8TH
 FLOOR. IF THIS IS A DEAD-END, A FULL SPACE TURN AROUND
 IS NEEDED PLUS A THREE FOOT SPACE FOR THE VEHICLE TO
 BACK INTO IN ORDER TO TURN AROUND. UNLESS THE SPACES
 ARE DESIGNATED?
 17. PARKING NUMBER LISTED ON SHEET A 1.03 FOR 8TH FLOOR
 DOES NOT APPEAR TO BE RIGHT, PLEASE CHECK (MAKE SURE
 DOES NOT COUNT FOR SPACES ALREADY INCLUDED IN 7TH FLOOR
 CALCULATIONS
 18. BICYCLE PARKING:
 A. FOR RESIDENTIAL USES ? REQUIRED BICYCLE PARKING IS
 ONE SPACE PER 15 PROVIDED PARKING SPACES NOT 20. 22
 SPACES REQUIRED, PLEASE UPDATE ACCORDINGLY
 B. 2 BICYCLE PARKING SPACES REQUIRED FOR PROPOSED
 COMMERCIAL SPACE (1/15 PROVIDED PARKING SPACES)
 C. 1 BICYCLE SPACE PER 100 FEET OF STREET FRONTAGE FOR
 PUBLIC USE. THIS WOULD COUNT OPEN SPACE, RESULTING IN 5
 REQUIRED PUBLIC BICYCLE RACKS (NOT INCLUDING
 MICROMOBILITY STATION)
 D. BASED ON CURRENT SF AND UNIT BREAKDOWN, STAFF COUNTS
 148 REQUIRED BICYCLE SPACES (143 INSIDE AND COVERED, 5
 OUTSIDE FOR PUBLIC)
 E. INCLUDE BICYCLE RACK DETAIL FOR INTERIOR BICYCLE
 ROOM BIKE RACKS (ARE THESE WALL MOUNTED?). NEED TO
 INDICATE EXACT SPACING REQUIRED FOR INTERIOR RACKS
 F. WHERE IS ENTRANCE INTO BICYCLE STORAGE FOR TENANTS?
 19. CORRECT LABEL ON SHEET A0.02 FOR LEVELS 2- 9 FAR
 FLOOR PLANS ( CURRENTLY LISTS LEVEL 2-81)
 20. 30% OF 317?5? IS 95.25 FOR REQUIRED ACTIVE USE,
 PLEASE UPDATE ON SHEET A 0.03
 21. GROUND FLOOR RESIDENTIAL SHALL BE RAISED A MINIMUM
 OF 18 INCHES ABOVE SIDEWALK ? PLEASE ILLUSTRATE
 COMPLIANCE
 22. SUGGEST ADDITIONAL DOORWAY FROM OPEN SPACE INTO
 BUILDING MANAGEMENT TO MEET INTENT OF ACTIVE USE
 INTERACTION WITH OPEN SPACE WITHIN CLD DISTRICT
 23. PLEASE INCLUDE FOLLOWING EXHIBITS ILLUSTRATING
 COMPLIANCE:
 A. TRANSPARENCY
 B. PLANAR BREAKS ? DOES NOT APPEAR TO MEET PLANAR BREAK
 ALONG CLEARWATER DRIVE
 C. HORIZONTAL PROJECTIONS
 D. FAR TABLE WITH CALCULATIONS FOR EACH FLOOR AND FOR
 TOTAL
 24. SHOW ADJACENT PROPERTY CURB LINES, PARKING LOTS,
 STRUCTURES ETC. ON SITE PLAN AND CIVIL PLANS
 25. HOW WILL TRASH PICKUP WORK FOR NEW BUILDING? WHERE
 WILL EXISTING TRASH FOR EDGE BUILDING BE RELOCATED?
 26. PLEASE PROVIDE COLOR ELEVATIONS WITH DETAILS FOR
 MATERIALS. PLEASE INCLUDE EXAMPLE IMAGES OF MATERIALS
 FOR BETTER CLARIFICATION. PLEASE INCLUDE EXHIBIT FOR
 PARKING GARAGE SCREENING WHICH CLEARLY SHOWS SPACING IN
 THE PROPOSED GARAGE SCREENING AND MATERIAL (EXAMPLE
 IMAGES WOULD BE HELPFUL) AND DEPTH OF PANELS,
 DIFFERENCE IN PANEL DEPTHS. NEED ADDITIONAL DETAIL TO
 BE ABLE TO REVIEW AND ENSURE THAT PARKING GARAGE
 SCREENING IS EFFICIENT
 27. PLEASE ADD FA?ADE ARTICULATION TO NORTH FA?ADE
 PARKING GARAGE AREA. PLEASE NOTE, NO BLANK WALLS ARE
 PERMITTED THAT CAN BE SEEN FROM ADJACENT STREETS, OR
 ADJACENT PROPERTIES (SECTION 94-109 ? BLANK WALL
 DEFINITION). ARCHITECTURAL TREATMENT SHALL SCREEN
 NON-ACTIVE USES THROUGH A COMBINATION OF TWO OR MORE
 TREATMENTS INCLUDING, BUT NOT LIMITED TO, THE USE OF
 MATERIALS AND CONSTRUCTION ASSEMBLIES; THE CONTINUATION
 OF FENESTRATION PATTERNS, ARCHITECTURAL FEATURES,
 ARTICULATION AND RHYTHM; THE APPLICATION OF
 ARCHITECTURAL SCREENS, MESHES, LOUVERS, AND GLASS, ETC.
 THIS DOES NOT INCLUDE PAINT AND FAUX TREATMENTS OR
 SCORING OR PROJECTIONS LESS THAN FOUR INCHES IN DEPTH,
 WIDTH OR HEIGHT.
 28. NORTH FLOOR PLAN WINDOW LOCATIONS DO NOT MATCH
 NORTH ELEVATION- PLEASE COORDINATE. CONSIDER ADDITIONAL
 HORIZONTAL ELEMENT ALONG NORTH FA?ADE OF CORNER UNIT
 D-3 TO HELP BREAK UP HEIGHT OF BLANK WALL SECTIONS AT
 THIS CORNER.
 29. PLEASE INCLUDE DOORS IN ELEVATION PLANS
 30. WHAT IS THICKNESS OF WHITE BANDING THROUGHOUT THE
 FACADES? WILL THIS BE THICK ENOUGH TO CREATE DEPTH TO
 THE FEATURE AS INTENDED?
 31. PLEASE SUBMIT COLOR RENDERINGS FROM GROUND VIEW
 PERSPECTIVE. INCLUDE LANDSCAPE AS PROPOSED, AT PLANTING
 HEIGHT FOR ACCURATE CONSTRUCTION REPRESENTATION.
 32. PLEASE INCLUDE ARCHITECTURAL TREATMENT ON EAST
 ELEVATION TO BIKE STORAGE AND STORAGE TO ALLEVIATE
 BLANK WALL ALONG THIS FA?ADE.
 33. PLEASE SUBMIT CONTEXTUAL ELEVATIONS
 34. CONSIDER WHETHER THE PARAPET HEIGHT WILL SCREEN ALL
 ROOF-MOUNTED EQUIPMENT ? ROOF MOUNTED EQUIPMENT SHALL
 BE SCREENED TO THE HEIGHT OF THE EQUIPMENT THROUGH
 PARAPET OR OTHER MEANS
 35. BLANK WALL ON FLOORS 10-17 ON EAST ELEVATION (STAIR
 AND ELEVATOR AND NORTH SIDE TOWER) ? NEEDS ADDITIONAL
 TREATMENT FOR NONACTIVE USE. CONSIDER WINDOWS ON NORTH
 TOWER FACING EDGE BUILDING OR OTHER TREATMENT
 36. WHERE IS THE ACCESS TO THE DOG PARK PROPOSED? WILL
 IT CONNECT TO CLEARWATER DRIVE? PLEASE PROVIDE MORE
 DETAIL
 37. IS EXISTING ASPHALT ADJACENT TO EXISTING DUMPSTER
 ENCLOSURE BEING REMOVED? PLEASE CLARIFY ON ALL PLANS
 38. PROVIDE PHOTOMETRIC ANALYSIS PLANS ? TO INCLUDE
 PUBLIC OPEN SPACE, ALL BUILDING ENTRANCES AND PATHWAYS
 ? INCLUDING DOG PARK ENTRANCE
  
 LANDSCAPE:
 39. PLEASE SUBMIT TREE DISPOSITION PLAN
 40. EXISTING OAK TREES ALONG CLEARWATER DRIVE MAY BE
 ABLE TO BE RELOCATED TO PLANTING BED CLOSER TO CURB-
 SEE LANDSCAPE COMMENTS. NEED TO COORDINATE WITH
 ENGINEERING FOR UTILITY LINE PLACEMENT
 41. SHOW EXISTING PROPERTY LINES ON LANDSCAPE PLANS ?
 LANDSCAPE PROPOSED ON EDGE ASSOCIATION PROPERTY CANNOT
 COUNT TOWARDS LANDSCAPE CALCULATIONS FOR PROJECT- CHECK
 WITH RAY
 42. SPECIFIC TYPE OF PUBLIC OPEN SPACE AND PRIVATE OPEN
 SPACE IS REQUIRED. PLEASE INCLUDE SPECIFIC TYPE AND
 TABLES ILLUSTRATING HOW REQUIREMENTS FOR SPECIFIC OPEN
 SPACE TYPES HAVE BEEN MET. NEED ADDITIONAL DETAIL TO
 DETERMINE IF OPEN SPACE IS AN IMPROVEMENT ON SITE. THE
 INITIAL DESIGN DOES NOT SEEM TO BE A BIG IMPROVEMENT TO
 PUBLIC SPACE. NEED TO COORDINATE
 43. PLEASE PRESERVE THE TWO TREES THAT EXIST ON THE
 WEST SIDE OF THE DRY RETENTION AREA (NEW PROPOSED OPEN
 SPACE) BY MEANS OF ISLANDS OR SHIFTING/REMOVING SOME
 PARKING SPACES
 44. PROVIDE HARDSCAPE PLAN ILLUSTRATING PROPOSED
 CONCEPTUAL PAVERS, FOUNTAIN (INCLUDING DEPTH OF
 FOUNTAIN AND PROTECTIVE BARRIER), PAVER
 BANDING/CONCRETE BANDING, SEATING OPEN SPACE, ETC.
 45. LANDSCAPE PLAN SHEET PL-1 DOES NOT SEEM TO ACCOUNT
 FOR FIRE, IRRIGATION AND WATER ASSEMBLY ADJACENT TO
 PROPOSED OPEN SPACE ? PLEASE COORDINATE WITH CIVIL PLAN
 46. COORDINATE WITH ARCHITECTURAL/SITE PLAN FOR DOORWAY
 LOCATIONS ALONG DOG PARK
 47. ARE TREES PROPOSED ALONG CLEARWATER DRIVE IN A
 LANDSCAPE BED? THIS IS PREFERRED IF 8-FOOT SIDEWALK
 CLEARANCE CAN BE MAINTAINED BETWEEN BUILDING FA?ADE AND
 BED (APPEARS IT CAN)
 48. KEEP CLEAR SIDEWALK OF EIGHT FEET THROUGH ENTIRE
 PROJECT WIDTH INCLUDING AREA BETWEEN PUBLIC OPEN SPACE
 AND PARALLEL PARKING SPACES AND BETWEEN WALK UP GARDENS
 AND CURB LINE
 49. CANNOT DETERMINE IF TREES ON NORTH SIDE OF PUBLIC
 OPEN SPACE ARE EXISTING. STAFF DOES NOT WANT THE
 EXISTING MATURE TREES AT THIS LOCATION REMOVED
 50. ABOVE GROUND UTILITIES ALONG BUILDINGS SOUTH FA?ADE
 SHALL BE SCREENED WITH LANDSCAPE HEDGE TO BEST EXTENT
 POSSIBLE. PLEASE INCLUDE IN LANDSCAPE PLAN
 51. OFF SITE LANDSCAPE IN EDGE ASSOCIATION PROPERTY
 (ALONG EXISTING DUMPSTER ENCLOSURE AREA) ? WHETHER THIS
 CAN BE COUNTED TOWARDS MITIGATION OR LANDSCAPE
 CALCULATIONS DEPENDS ON HOW ORIGINAL ASSOCIATION
 DOCUMENTS WERE WRITTEN AND ORIGINAL PLAN FOR PHASE I
 AND II (SEE COMMENT #2)
 52. PLEASE PROVIDE DETAIL OF WALK UP GARDEN- SEE TABLE
 IV-7 AND DEFINITION OF WALK UP GARDEN IN SECTION
 94-109. WALK UP GARDENS CANNOT BE COVERED
 53. DUE TO THE SITE?S SIZE AND THE REQUEST FOR
 VARIANCES, THIS PROJECT IS SUBJECT TO DAC REVIEW PRIOR
 TO COMPLETING PPRC PROCESS
 54. APPLICANT SHALL MEET AIPP REQUIREMENTS ? CONTACT
 SYBILLE WELTER, AIPP COORDINATOR AT [email protected]
  
 CIVIL:
 55. MAINTAIN AND ENHANCE CONNECTION FROM PROPOSED
 PUBLIC OPEN SPACE TO MULTI MODAL CENTER THROUGH ADA
 RAMP AND CROSSWALK
 56. DO NOT SEE DETAIL FOR WS-8 WATER METER OR WS-11
 IRRIGATION METER AS LABELED ON SHEET C-03
 57. PLEASE NOTE, LOCATION OF ALL ABOVE GROUND
 UTILITIES, INCLUDING BACKFLOW ASSEMBLIES, WATER METERS,
 FDC, FIRE BACKFLOWS, GENERATORS, IRRIGATION METERS,
 ETC. REQUIRE ZONING APPROVAL IN COORDINATION WITH
 PUBLIC WORKS AND CITY ENGINEERING DEPARTMENT
 58. PARKING SPACES SHALL BE DOUBLE STRIPED
 59. BUILDING FOOT PRINT DOES NOT EXACTLY MATCH
 ARCHITECTURAL PLANS ? PLEASE CHECK AND AMEND AS
 NECESSARY
 60. FDC SHALL BE WALL MOUNTED WHENEVER POSSIBLE,
 SUBJECT TO FIRE DEPARTMENT APPROVAL
  
 61. NUMBER OF PARALLEL PARKING SPACES ALONG CLEARWATER
 DRIVE DOES NOT MATCH SITE PLAN ? PLEASE COORDINATE
 62. RELOCATED WATER METER, FIRE BACKFLOW AND ASSEMBLY,
 ETC. ? WILL NEED TO COORDINATE WITH PUBLIC WORKS, FIRE
 DEPARTMENT AND PUBLIC UTILITIES TO FIND BEST LOCATION
 FOR THESE SERVICES AS THEY ARE BEING RELOCATED. THESE
 TYPES OF UTILITIES SHOULD NOT BE WITHIN PUBLIC OPEN
 SPACE. WILL NEED TO DISCUSS AND FIND BEST SOLUTION AND
 ALLOW FOR CONTINUOUS SIDEWALK ADJACENT TO PARALLEL
 PARKING SPACES
 63. PROVIDE CROSS SECTIONS FOR SIDEWALKS, PARALLEL
 PARKING SPACES, OPEN SPACE AREAS, ETC. PLEASE PROVIDE A
 PARALLEL CUB CUT ACROSS ALL PARKING GARAGE ENTRANCES,
 SHOWING SLOPE OF SIDEWALK
 64. SHOW ALL DOORWAYS ON CIVIL PLANS AND INDICATE HOW
 GRADE CHANGES ARE BEING ACCOMMODATED. ALL GRADE CHANGES
 SHOULD OCCUR INTERIOR TO THE BUILDING, NOT ON THE
 SIDEWALK/ROW
 PROPOSED CONDITIONS OF APPROVAL:
 65. ALL PORTIONS OF THE PARKING GARAGE SHALL BE PAINTED
 (CEILING AND WALLS INCLUDING ANY UTILITIES AND PIPING)
 TO A DEPTH OF 20 FEET. ALL PARKING GARAGE LIGHTING
 SHALL BE SHIELDED
 66. PLEASE NOTE, ALL PROJECTS WITH MICROUNITS SHALL
 CONTRIBUTE TO THE CITY TROLLEY FUND AT A RATE OF $10
 PER MICROUNIT PER MONTH
 67. ALL ROOFTOP EQUIPMENT SHALL BE SCREENED TO THE
 HEIGHT OF THE EQUIPMENT. ALL WALL MOUNTED EQUIPMENT
 SHALL BE ARCHITECTURALLY SCREENED OR PAINTED TO MATCH
 BUILDING FA?ADE
  
 SEE OTHER DEPARTMENT COMMENTS FOR ADDITIONAL STANDARD
 PROPOSED PROVISOS
  

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved