Plan Review Details - Project Z20050014
Plan Review Stops For Project Z20050014
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 09-24-2020 Cont ID  
Sent By eschneid Date 09-24-2020 Time 14:13 Rev Time 0.00
Received By eschneid Date   Time   Sent To  
Notes
2020-09-24 14:14:15PASSED PER ROBERT BROWN E-MAIL DATED AUGUST 26, 2020
 (IN FILE).

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 07-23-2020 Cont ID  
Sent By rbrown Date 07-23-2020 Time 13:28 Rev Time 0.00
Received By rbrown Date 07-23-2020 Time 13:27 Sent To  
Notes
2020-07-23 13:29:14DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR THE BUILDING PERMIT APPLICATION.
  
 2. EGRESS FROM THE BLEACHERS. SITE PLAN, SHEET C-1,
 SHOWS ONLY ONE 5'-0" PATH FOR EGRESS FROM THE
 BLEACHERS. THE PROPOSAL IS TO INCREASE THE TOTAL NUMBER
 OF OCCUPANTS FROM 534 SEATS TO 1324 SEATS. AT LEAST ONE
 ADDITIONAL EGRESS PATH IS REQUIRED PER SECTION 1029 OF
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE BASED
 ON REVIEW OF FIRE SAFETY PLAN, FS-1
 - THE GREEN ROUTE SHOWS PEOPLE GETTING OFF THE
 BLEACHERS, GOING SOUTH ALONGSIDE THE BLEACHERS, AROUND
 THE END OF THE BLEACHERS AND THEN BACK NORTH ALONGSIDE
 THE SAME BLEACHERS. IF THE PROBLEM IS AT THE BLEACHERS,
 THAT ROUTE DOES NOT TAKE PEOPLE DIRECTLY AWAY FROM THE
 BLEACHERS.
 - THE RED ROUTE GOES THROUGH A GATE WHICH SWINGS THE
 WRONG WAY, WOULD NOT HAVE APPROPRIATE EGRESS HARDWARE
 FOR AN ASSEMBLY OCCUPANCY TYPE, AND LEADS ONTO THE
 PLAYING FIELD WHICH IS NOT WHEELCHAIR ACCESSIBLE.
  
 3. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS,
 GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND
 OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS,
 SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC.
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 06-10-2020 Cont ID  
Sent By rbrown Date 06-10-2020 Time 19:13 Rev Time 0.00
Received By rbrown Date 06-10-2020 Time 19:13 Sent To  
Notes
2020-06-10 19:22:25DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR THE BUILDING PERMIT APPLICATION.
  
 2. EGRESS FROM THE BLEACHERS. SITE PLAN, SHEET C-1,
 SHOWS ONLY ONE 5'-0" PATH FOR EGRESS FROM THE
 BLEACHERS. THE PROPOSAL IS TO INCREASE THE TOTAL NUMBER
 OF OCCUPANTS FROM 534 SEATS TO 1324 SEATS. AT LEAST ONE
 ADDITIONAL EGRESS PATH IS REQUIRED PER SECTION 1029 OF
 FLORIDA BUILDING CODE.
  
 3. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS,
 GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND
 OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS,
 SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC.
  
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 2 Status P Date 06-30-2020 Cont ID  
Sent By rrossano Date 06-30-2020 Time   Rev Time 0.00
Received By rrossano Date 06-30-2020 Time   Sent To  
Notes
***NONE***

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status F Date 06-04-2020 Cont ID  
Sent By rrossano Date 06-04-2020 Time   Rev Time  
Received By rrossano Date 06-04-2020 Time   Sent To  
Notes
2020-06-04 11:04:09COMMENT PER MARK HURLEY, CITY OF WPB PUBLIC UTILITIES
 CUSTOMER SERVICE SUPERVISOR, [email protected],
 561-822-2262:
 IS THE BUILDING ADJACENT BLEACHER EXPANSION USING WATER
 SERVICE FROM CITY OF WEST PALM BEACH UTILITIES? IF SO,
 DETERMINE IF EXISTING WATER SERVICE IS SUITABLE FOR ANY
 EXTRA DEMAND CREATED.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO
 PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1098
 FAX: (561) 494-1116
 MOBILE: (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 09-24-2020 Cont ID  
Sent By eschneid Date 09-24-2020 Time 13:28 Rev Time 0.00
Received By eschneid Date 09-24-2020 Time 13:28 Sent To  
Notes
2020-09-24 13:42:17PASSED PER PETER LEDUC E-MAIL DATED AUGUST 28, 2020 (IN
 FILE).

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 06-03-2020 Cont ID  
Sent By pleduc Date 06-03-2020 Time 12:48 Rev Time 0.00
Received By pleduc Date 06-03-2020 Time 12:48 Sent To  
Notes
2020-06-03 13:06:20THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC,
 FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM
 BEACH FIRE RESCUE.
  
 THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE
 DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE.
 ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS
 ARE SUBMITTED FOR PERMIT.
  
 THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE
 PROPOSED PROJECT.
  
 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY
 WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE
 PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A
 PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED
 TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN
 STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY
 MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER
 PROTECTION.
  
 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY
 IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING
 ALL CONSTRUCTION ACTIVITIES.
  
 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM
 ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION.
 ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND
 AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT
 WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS.
  
 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE
 REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE
 ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS.
  
 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH
 THE 6TH EDITION OF THE FLORIDA FIRE PREVENTION CODE,
 INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES.
  
 6. FOR PLAN REVIEW SUBMITTAL, PLEASE INCLUDE THE
 OCCUPANCY TYPE, PER THE FLORIDA FIRE PREVENTION CODE.
  
 7. WITH THE ADDITIONAL SEATING THERE REMAINS ONLY ONE
 EXIT FROM THE AREA. ON REVIEW OF THE FIRE CODE, 2
 ADDITIONAL EXITS MAY BE REQUIRED BASED ON THE TOTAL
 NUMBER OF OCCUPANTS. PLEASE PROVIDE THE INCREASED
 OCCUPANCY LOAD CALCULATIONS AND THE ADDITIONAL EXITS,
 INCLUDING THE WIDTH, REMOTE FROM EACH OTHER, REQUIRED
 FOR THE OCCUPANCY LOAD.
  
 8. COMPLETE LIFE SAFETY PLANS FOR SHALL BE PROVIDED
 THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL DISTANCES,
 COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS, EXIT SIGNS,
 EMERGENCY LIGHTING, EXITS LEADING TO A PUBLIC WAY, FIRE
 EXTINGUISHER LOCATIONS, AND ALL FIRE SAFETY FEATURES
 AND EQUIPMENT.
  
 9. THE BUREAU'S APPROVAL (OR DENIAL) OF THIS SUBMITTED
 PROJECT WOULD NOT CONSTITUTE ITS FINAL REVIEW OR
 APPROVAL.
  
 10. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING
 PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH
 THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop L LANDSCAPING
Rev No 3 Status P Date 09-23-2020 Cont ID  
Sent By rcaranci Date 09-23-2020 Time 16:56 Rev Time 0.00
Received By rcaranci Date 09-23-2020 Time 16:56 Sent To  
Notes
2020-09-23 16:57:16FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: KEISER U STADIUM MAJOR Z20050014
 SEPTEMBER 23, 2020
  
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. THE EXOTIC MANAGEMENT OUTLINE NEEDS THE FOLLOWING
 REVISIONS:
 ? SATISFIED. STAFF SUGGESTS RECONFIGURING PHASE AREAS
 TO ALIGN WITH ROADS OR ALREADY ESTABLISHED DIVIDING
 LINES. THIS WOULD RESULT IN 5 PHASES WITHIN THE WESTERN
 AREAS. THERE IS A PORTION BETWEEN THE NORTHEAST PARKING
 LOTS THAT HAS NOT BEEN ADDRESSED, AND THE ENTIRE SITE
 NEEDS TO BE ADDED TO SHOW HOW MAINTENANCE WILL BE
 HANDLED TO CONTROL AND REMOVE ANY INVASIVES.
 ? SATISFIED. THE OUTLINE INDICATES BUFFER ZONES TO BE
 LEFT IN EACH PHASE. THE INITIAL CONTROL AND FOLLOW UP
 NEEDS TO BE DEFINED.
  
 2. SATISFIED. THE SCHEDULE FOR EXOTIC INVASIVE
 MANAGEMENT PHASES TO BE COMPLETED BY DATE MUST BE
 INCLUDED. EACH PHASE SHOULD HAVE A START AND COMPLETION
 DATE ASSIGNED AS PART OF THE CONDITION SO THAT THERE IS
 A PROGRESSION OF AREAS BEING COMPLETED DURING THE
 OVERALL TIME PERIOD. ONCE THIS INFORMATION IS SUPPLIED,
 THE CONDITION CAN BE MODIFIED TO INCORPORATE THE DATES
 AND MANAGEMENT PLAN.
  
 3. SATISFIED. PROVIDE A MANAGEMENT PLAN FOR CONTROLLING
 INVASIVE EXOTIC SPECIES ON THE PHASES AND FOR THE
 ENTIRE CAMPUS TO PROVIDE INSTRUCTION FOR FUTURE
 MAINTENANCE.
  
  
 4. SATISFIED. EXPLAIN CLOUDED CHANGE (2) ON SHEET L-3
 FOR ADDITION OF 3 LIVE OAKS AND 3 GREEN BUTTONWOOD
 TREES. THERE IS AN ADDITION OF ONE GREEN BUTTONWOOD.
 ADDITIONAL COMMENTS 7/13/20:
 5. SATISFIED. THE PHASING AREAS 1 AND 2 ARE OUTSIDE THE
 BOUNDARY OF THE PD AND ARE NOT REGULATED BY THE PD
 CONDITIONS. THE INVASIVE EXOTIC MANAGEMENT PLAN AND
 CONDITION OF APPROVAL NEED TO SHOW THE AREAS AND
 COMPLETION DATES FOR THE OTHER PHASES WITHIN THE PD
 BOUNDARIES. AREAS 1 AND 2 MAY BE DONE AT ANY TIME.
  
 6. SATISFIED. LABEL THE ADDED TURF AREAS IN FRONT OF
 THE BLEACHERS AS ?ARTIFICIAL TURF? IF THEY ARE INTENDED
 TO BE SYNTHETIC GRASS.
  
 7. SATISFIED. PROVIDE ANY CHANGES PROPOSED FOR THE NEW
 DORM BUILDING REGARDING TREE SPECIES AND PLACEMENT.
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop L LANDSCAPING
Rev No 2 Status F Date 07-13-2020 Cont ID  
Sent By rcaranci Date 07-13-2020 Time 15:47 Rev Time 0.00
Received By rcaranci Date 07-13-2020 Time 15:47 Sent To  
Notes
2020-07-13 15:48:06FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: KEISER U STADIUM MAJOR Z20050014
 JULY 13, 2020
  
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. THE EXOTIC MANAGEMENT OUTLINE NEEDS THE FOLLOWING
 REVISIONS:
 ? SATISFIED. STAFF SUGGESTS RECONFIGURING PHASE AREAS
 TO ALIGN WITH ROADS OR ALREADY ESTABLISHED DIVIDING
 LINES. THIS WOULD RESULT IN 5 PHASES WITHIN THE WESTERN
 AREAS. THERE IS A PORTION BETWEEN THE NORTHEAST PARKING
 LOTS THAT HAS NOT BEEN ADDRESSED, AND THE ENTIRE SITE
 NEEDS TO BE ADDED TO SHOW HOW MAINTENANCE WILL BE
 HANDLED TO CONTROL AND REMOVE ANY INVASIVES.
 ? SATISFIED. THE OUTLINE INDICATES BUFFER ZONES TO BE
 LEFT IN EACH PHASE. THE INITIAL CONTROL AND FOLLOW UP
 NEEDS TO BE DEFINED.
  
 2. SATISFIED. THE SCHEDULE FOR EXOTIC INVASIVE
 MANAGEMENT PHASES TO BE COMPLETED BY DATE MUST BE
 INCLUDED. EACH PHASE SHOULD HAVE A START AND COMPLETION
 DATE ASSIGNED AS PART OF THE CONDITION SO THAT THERE IS
 A PROGRESSION OF AREAS BEING COMPLETED DURING THE
 OVERALL TIME PERIOD. ONCE THIS INFORMATION IS SUPPLIED,
 THE CONDITION CAN BE MODIFIED TO INCORPORATE THE DATES
 AND MANAGEMENT PLAN.
  
 3. SATISFIED. PROVIDE A MANAGEMENT PLAN FOR CONTROLLING
 INVASIVE EXOTIC SPECIES ON THE PHASES AND FOR THE
 ENTIRE CAMPUS TO PROVIDE INSTRUCTION FOR FUTURE
 MAINTENANCE.
  
  
 4. SATISFIED. EXPLAIN CLOUDED CHANGE (2) ON SHEET L-3
 FOR ADDITION OF 3 LIVE OAKS AND 3 GREEN BUTTONWOOD
 TREES. THERE IS AN ADDITION OF ONE GREEN BUTTONWOOD.
 ADDITIONAL COMMENTS 7/13/20:
 5. THE PHASING AREAS 1 AND 2 ARE OUTSIDE THE BOUNDARY
 OF THE PD AND ARE NOT REGULATED BY THE PD CONDITIONS.
 THE INVASIVE EXOTIC MANAGEMENT PLAN AND CONDITION OF
 APPROVAL NEED TO SHOW THE AREAS AND COMPLETION DATES
 FOR THE OTHER PHASES WITHIN THE PD BOUNDARIES. AREAS 1
 AND 2 MAY BE DONE AT ANY TIME.
  
 6. LABEL THE ADDED TURF AREAS IN FRONT OF THE BLEACHERS
 AS ?ARTIFICIAL TURF? IF THEY ARE INTENDED TO BE
 SYNTHETIC GRASS.
  
 7. PROVIDE ANY CHANGES PROPOSED FOR THE NEW DORM
 BUILDING REGARDING TREE SPECIES AND PLACEMENT.
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop L LANDSCAPING
Rev No 1 Status F Date 06-04-2020 Cont ID  
Sent By rcaranci Date 06-04-2020 Time 17:05 Rev Time 0.00
Received By rcaranci Date 06-04-2020 Time 17:05 Sent To  
Notes
2020-06-04 17:05:40FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: KEISER U STADIUM MAJOR Z20050014
 JUNE 4, 2020
  
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. THE EXOTIC MANAGEMENT OUTLINE NEEDS THE FOLLOWING
 REVISIONS:
 ? STAFF SUGGESTS RECONFIGURING PHASE AREAS TO ALIGN
 WITH ROADS OR ALREADY ESTABLISHED DIVIDING LINES. THIS
 WOULD RESULT IN 5 PHASES WITHIN THE WESTERN AREAS.
 THERE IS A PORTION BETWEEN THE NORTHEAST PARKING LOTS
 THAT HAS NOT BEEN ADDRESSED, AND THE ENTIRE SITE NEEDS
 TO BE ADDED TO SHOW HOW MAINTENANCE WILL BE HANDLED TO
 CONTROL AND REMOVE ANY INVASIVES.
 ? THE OUTLINE INDICATES BUFFER ZONES TO BE LEFT IN EACH
 PHASE. THE INITIAL CONTROL AND FOLLOW UP NEEDS TO BE
 DEFINED.
  
 2. THE SCHEDULE FOR EXOTIC INVASIVE MANAGEMENT PHASES
 TO BE COMPLETED BY DATE MUST BE INCLUDED. EACH PHASE
 SHOULD HAVE A START AND COMPLETION DATE ASSIGNED AS
 PART OF THE CONDITION SO THAT THERE IS A PROGRESSION OF
 AREAS BEING COMPLETED DURING THE OVERALL TIME PERIOD.
 ONCE THIS INFORMATION IS SUPPLIED, THE CONDITION CAN BE
 MODIFIED TO INCORPORATE THE DATES AND MANAGEMENT PLAN.
  
 3. PROVIDE A MANAGEMENT PLAN FOR CONTROLLING INVASIVE
 EXOTIC SPECIES ON THE PHASES AND FOR THE ENTIRE CAMPUS
 TO PROVIDE INSTRUCTION FOR FUTURE MAINTENANCE.
  
 4. EXPLAIN CLOUDED CHANGE (2) ON SHEET L-3 FOR ADDITION
 OF 3 LIVE OAKS AND 3 GREEN BUTTONWOOD TREES. THERE IS
 AN ADDITION OF ONE GREEN BUTTONWOOD.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop PARK PARKING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PW PUBLIC WORKS
Rev No 2 Status P Date 07-06-2020 Cont ID  
Sent By   Date 07-06-2020 Time   Rev Time 0.00
Received By   Date 07-06-2020 Time   Sent To  
Notes
2020-07-06 09:34:03NO FURTHER COMMENTS.
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045

Review Stop PW PUBLIC WORKS
Rev No 1 Status F Date 06-04-2020 Cont ID  
Sent By   Date 06-04-2020 Time   Rev Time  
Received By   Date 06-04-2020 Time   Sent To  
Notes
2020-06-04 20:11:38PLEASE PROVIDE THE FOLLOWINGS:
 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID
 WASTE VOLUME PRODUCED ALONG WITH THE SIZE AND TYPE OF
 THE CONTAINER (I.E. DUMPSTER/COMPACTOR) THAT WILL BE
 UTILIZED THAT WILL BE UTILIZED FOR THE SANITATION
 SERVICE.
 2- DUMPSTER ENCLOSURE DETAIL. FOR A FREESTANDING SITE
 DUMPSTER ENCLOSURE, THE ENCLOSURE SHALL COMPLY WITH THE
 LATEST REVISION OF CITY OF WEST PALM BEACH GENERAL
 CONSTRUCTION-GARBAGE ENCLOSURE STANDARD, CG-7.
  
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]
 561-822-2045

Review Stop STORM STORMWATER
Rev No 2 Status P Date 07-28-2020 Cont ID  
Sent By tward Date 07-28-2020 Time 10:18 Rev Time 0.00
Received By tward Date 07-28-2020 Time 10:25 Sent To  
Notes
2020-07-28 10:25:30ALTHOUGH THE BLEACHER EXPANSION DOES NOT NECESSARILY
 REQUIRE THE STORMWATER MASTER PLAN, I WOULD SUGGEST THE
 SWMP BE REQUIRED FOR ANY FUTURE CAMPUS DEVELOPMENT.
  
 TRACY WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120 (O)
 561-351-0510 (M)

Review Stop STORM STORMWATER
Rev No 1 Status F Date 06-11-2020 Cont ID  
Sent By tward Date 06-11-2020 Time 10:04 Rev Time 0.00
Received By tward Date 06-11-2020 Time 10:06 Sent To  
Notes
2020-06-11 10:05:58THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. INDICATE IF ADDITIONAL WATER QUALITY TREATMENT WILL
 BE NEEDED FOR THE RUNOFF FROM THE CONCRETE PADS
 CONSTRUCTED FOR THE TWO ADDITIONAL SETS OF BLEACHERS.
  
 2. PREPARE AND SUBMIT A STORMWATER MASTER PLAN FOR THE
 ENTIRE CAMPUS. THE STORMWATER MASTER PLAN SHOULD
 INCLUDE THE PROPOSED AND EXISTING DEVELOPMENT OF THE
 CAMPUS AND INDICATE HOW MUCH ADDITIONAL STORMWATER
 MANAGEMENT AREAS (LAKES, DRY DETENTION AREAS, ETC) WILL
 BE NEEDED FOR EACH AREA TO BE DEVELOPED.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP MODIFICATION AND
 DRAINAGE CALCULATIONS PRIOR TO STARTING CONSTRUCTION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  

Review Stop SURVEY SURVEYING
Rev No 1 Status P Date 06-10-2020 Cont ID  
Sent By vnoel Date 06-10-2020 Time 07:47 Rev Time  
Received By vnoel Date   Time   Sent To  
Notes
2020-06-10 07:48:00NO COMMENTS ON SURVEY.

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 2 Status P Date 07-14-2020 Cont ID  
Sent By   Date 07-14-2020 Time   Rev Time 0.00
Received By   Date 06-30-2020 Time   Sent To  
Notes
2020-07-14 15:57:18NO FURTHER COMMENTS.
  
 CONDITIONS:
  
 1. PROVIDE A COPY OF THE "CERTIFIED ANNUAL ENROLLMENT
 AND STAFFING VERIFICATION LETTER" ON OCTOBER 1, 2020 TO
 THE CITY TRANSPORTATION DIVISION (ATTENTION OF: CITY
 TRAFFIC AND TRANSPORTATION ENGINEER)
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
2020-06-11 14:06:11TRAFFIC STATEMENT COMMENTS:
 1. PLEASE CLARIFY HOW MANY VEHICULAR TRIPS ARE
 GENERATED FROM THE EXISTING STADIUM DURING EACH EVENT
 AND HOW MANY VEHICULAR TRIPS ARE EXPECTED WITH THE
 PROPOSED EXPANSION.
 2. PROVIDE AN HCM INTERSECTION ANALYSIS AT THE MILITARY
 TRAIL AND NORTHWOOD UNIVERSITY DR INTERSECTION BASED ON
 SUCH VOLUMES
 3. CLARIFY WHAT EVENT MANAGEMENT STRATEGIES ARE
 DEPLOYED TODAY DURING EACH GAME AND WHAT STRATEGIES
 WILL BE USED WITH THE EXPANSION FOR MITIGATION PURPOSES
 4. VERIFY IF LEFT-TURN EGRESS AT THE MAIN DRIVEWAY ON
 MILITARY TRAIL POST-GAME WOULD CAUSE DELAY AT THE
 DRIVEWAY, AND IF ANY TRAFFIC CONTROL MEASURES WOULD BE
 DEPLOYED AT THE DRIVEWAYS TO DIRECT TRAFFIC PRE-GAME
 AND POST-GAME.
  
 SITE PLAN COMMENTS:
 1. PLEASE PROVIDE THE PARKING STUDY INDICATED IN THE
 MASTER PLAN WHICH INDICATES A 30% REDUCTION OF PARKING
 SPACES
  
 CONDITION:
 1. TBD
  

Review Stop Z ZONING
Rev No 3 Status P Date 09-24-2020 Cont ID  
Sent By eschneid Date 09-24-2020 Time 14:24 Rev Time 0.25
Received By eschneid Date 09-24-2020 Time 14:24 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 07-20-2020 Cont ID  
Sent By eschneid Date 07-20-2020 Time 10:44 Rev Time 0.25
Received By eschneid Date 07-20-2020 Time 09:44 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 06-05-2020 Cont ID  
Sent By eschneid Date 06-05-2020 Time 10:57 Rev Time 3.00
Received By eschneid Date 06-05-2020 Time 10:57 Sent To  
Notes
2020-06-05 11:00:12CASE NO. PB 1069BB
 KEISER UNIVERSITY STADIUM EXPANSION
 2600 NORTH MILITARY TRAIL
  
 - CONTACT ERIC SCHNEIDER @ (561) 822-1446,
 [email protected]
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF FIVE
 (5) PAPER COPIES AND AN ELECTRONIC COPY IN .PNG/.PDF
 FORMAT OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS
 TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL
 COMMENTS.
  
 - THE PPRC COMMENTS SHALL BE SUFFICIENTLY ADDRESSED AND
 SUBMITTED TO THE PLANNING DIVISION BY 5 PM ON FRIDAY,
 JUNE 26, 2020, TO BE ELIGIBLE TO BE SCHEDULED FOR THE
 AUGUST 18, 2020 PLANNING BOARD MEETING.
  
 - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT
 RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS
 FROM THE DATE OF THESE COMMENTS/THE PPRC MEETING (BY
 AUGUST 11, 2020), THE CASE SHALL BE CONSIDERED
 WITHDRAWN. ANY FURTHER ACTION SHALL REQUIRE A NEW
 DEVELOPMENT APPLICATION.
  
 - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($600).
  
 - PUBLIC HEARING NOTIFICATION SIGNAGE SHALL BE POSTED
 IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION
 94-39(I)(5) OF THE ZONING AND LAND DEVELOPMENT
 REGULATIONS.
  
 1) THE INFORMATION PROVIDED AS THE LIGHT MITIGATION
 STUDY IS JUST THE SPECIFICATION PAGES FOR THE SYSTEM
 THAT IS BEING INSTALLED. WHILE IT DOES INCLUDE
 PHOTOMETRIC AND CANDELA READINGS AT THE PROPERTY LINES,
 IT FAILS TO PROVIDE IN PLAIN TEXT HOW THE LIGHT OUTPUT
 AND GLARE DOES NOT CREATE A NEGATIVE IMPACT ON THE
 SURROUNDING PROPERTIES. OR IF IT HAS THE POTENTIAL TO
 CREATE A NEGATIVE IMPACT, HOW THE IMPACT IS MITIGATED
 (EX. THE PLACEMENT OF THE TREES IN THE BUFFER BLOCKS
 THE SIGHT LINES FROM THE NEIGHBORING PROPERTIES). NOTE:
 WHILE PRESENTING A MATHEMATICAL METHODOLOGY, THE NOISE
 ANALYSIS PRESENTS THE CONDITIONS AND CONCLUSION IN SUCH
 A WAY THAT A LAY PERSON CAN UNDERSTAND THAT THERE WILL
 BE MINIMAL SOUND IMPACT FROM THE PROPOSED STADIUM
 EXPANSION.
  
 2) THE SITE PLAN, SHEET C-1, SHOWS THE EASTERN FIELD
 LIGHT POLES IN A DIFFERENT LOCATION THAN THE PLANS
 INCLUDED WITH THE LIGHT MITIGATION STUDY. THE LANDSCAPE
 PLAN, SHEET L-3, SEEMS TO SHOW THE FIELD LIGHT POLES IN
 BOTH THE LOCATIONS SHOWN ON THE SITE PLAN AND THE LIGHT
 MITIGATION STUDY. ALL PLANS MUST SHOW THE SAME,
 ACCURATE CONDITIONS.
  
 3) THERE ARE SPELLING ERRORS AND STRAY LABELS ON THE
 MASTER PLAN.
  
 A. BUILDING MISSPELLED SOUTH OF NEW RESIDENCE HALL.
 B. EAST OF THE GUARDHOUSE THE EXISTING KEISER
 UNIVERSITY DRIVE INCLUDES A LABEL FOR FUTURE ROAD. THIS
 LABEL IS NOT NEEDED.
  
 4) STAFF MENTIONED IN PREVIOUS CORRESPONDENCE THAT IN
 ORDER TO PERMIT FUTURE FLEXIBILITY FOR CAMPUS
 DEVELOPMENT, THAT A DEVELOPMENT REGULATION IS ADDED
 THAT PERMITS THE RELOCATION OR CHANGING THE FUTURE
 BUILDING LABELS TO BE DONE AS A MINOR PLANNED
 DEVELOPMENT AMENDMENT AS LONG AS THERE ARE NO OTHER
 CHANGES OR WAIVERS REQUIRED BY THAT RELOCATION.
 CURRENTLY MODIFICATIONS TO THE MASTER PLAN REQUIRE CITY
 COMMISSION APPROVAL AS PART OF A MAJOR PLANNED
 DEVELOPMENT AMENDMENT (THIS OCCURRED WITH THE NEW
 DORMS). YOU WOULD STILL NEED TO DO A FORMAL SITE PLAN
 FOR THE SPECIFIC BUILD OUT OF THE AREA. AS PART OF THIS
 DEVELOPMENT REGULATION, STAFF FEELS THERE WOULD NEED TO
 BE A MODIFICATION TO THE USES PERMITTED BY RESOLUTION
 NO. 201-19 REGULATION 18. THIS COMMENT IS UP FOR
 FURTHER DISCUSSION, BUT WOULD NOT DELAY THE CURRENT
 APPLICATION IF KEISER UNIVERSITY DOES NOT WANT TO MOVE
 FORWARD WITH IT.
  
 A. CHANGE TO "THE USES PERMITTED SHALL BE THOSE USES
 PERMITTED IN THE "CS" ZONING DISTRICT SO LONG AS THEY
 ARE OPERATED BY OR IN PARTNERSHIP WITH KEISER
 UNIVERSITY". FOR EXAMPLE: THIS WOULD PERMIT PHYSICAL
 THERAPY OFFICE TO BE ADDED TO THE MASTER PLAN AS A
 MINOR AMENDMENT; HOWEVER, THE PHYSICAL THERAPY OFFICE
 WOULD NEED TO BE ASSOCIATED WITH YOUR HEALTH CARE
 PROGRAM.
  
 B. CURRENTLY, THE PERMITTED USES INCLUDE RECREATION,
 OUTDOOR, HIGH INTENSITY USES OPERATED BY OR IN
 PARTNERSHIP WITH KEISER UNIVERSITY. THE FOLLOWING ARE
 OUTDOOR HIGH INTENSITY USES IN THE CITY'S ZONING AND
 LAND DEVELOPMENT REGULATIONS:
  
 AMUSEMENT PARKS.
 DRIVE-IN THEATERS.
 GO-CART AND OTHER VEHICULAR TRACKS.
 GOLF COURSES.
 MINIATURE GOLF COURSES.
 SPORTS PARKS: TRAMPOLINES, BATTING CAGES, ETC.
 SPORTS AND RECREATION CAMPS.
 WATER SLIDES.
 WAVE POOLS.
  
 STAFF WOULD LIKE TO DISCUSS SCALING THIS BACK TO JUST
 THE SPECIFIC USES (SUCH AS SPORTS AND RECREATION CAMPS)
 THAT KEISER UNIVERSITY WOULD REASONABLY BE EXPECTED TO
 HAVE.
  
 C. THERE HAD BEEN DISCUSSION ABOUT THE POTENTIAL OF A
 PROFESSIONAL SPORTS TEAM UTILIZING THE ON CAMPUS
 STADIUM. THIS WOULD REQUIRE A FUTURE MAJOR PLANNED
 DEVELOPMENT AMENDMENT.
  

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved