Plan Review Details - Project Z20040015
| Plan Review Stops For Project Z20040015 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
05-13-2020 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
05-13-2020 |
Time |
18:15 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
05-13-2020 |
Time |
18:15 |
Sent To |
|
|
| Notes |
| 2020-05-13 18:18:19 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. DEMOLITION OF THE EXISTING BUILDING. AN ASBESTOS | | | SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT | | | REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH | | | COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963, | | | OR BY EMAIL: [email protected] | | | | | | 3. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 4. BUILDING LOCATION RELATIVE TO THE PROPERTY LINE AND | | | OTHER STRUCTURES. WHEN SUBMITTED FOR BUILDING PERMIT, | | | COMPLIANCE WITH ALL BUILDING SEPARATION, PERCENTAGE OF | | | OPENINGS AND OPENING PROTECTIVE REQUIREMENTS OF | | | CHAPTERS 6 AND 7 OF THE FLORIDA BUILDING CODE SHALL BE | | | VERIFIED. | | | | | | 5. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, GAS SYSTEMS, GENERATORS, FIRE ALARM SYSTEMS, | | | FIRE SPRINKLER AND OTHER FIRE SUPPRESSION SYSTEMS, | | | GREASE INTERCEPTORS, SITE LIGHTING, SITE LANDSCAPE, | | | SITE IRRIGATION, ETC. | | | | | | 6. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER | | | AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY, | | | INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE | | | CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF | | | NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION | | | THAT MAY AFFECT THE USE OF THEIR PROPERTY. | | | | | | 7. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT | | | TO ART IN PUBLIC PLACES (AIPP) ASSESSMENT. FOR ADVICE | | | ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP | | | ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC | | | PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL: | | | [email protected] | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-05-12 11:36:10 | 1. PLEASE RESPOND TO ALL COMMENTS IN WRITING, AND | | | INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER | | | (Z-XXXXXXXX). | | | 2. THE CITY OF WEST PALM BEACH HAS A NUMBER OF | | | REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY | | | AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND | | | WASTEWATER UTILITIES WITHIN THE CITY. PLEASE SEE | | | DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AT THE LINK | | | BELOW: | | | HTTP://WPB.ORG/CMSPAGES/GETAMAZONFILE.ASPX?PATH=~\WPB_W | | | EBSITE\MEDIA\ENGINEERING\DEVELOPMENT-APPLICATION-FULL-P | | | ACKAGE_2016.PDF&HASH=7BD4DD7EB6115181D8C5977BCC02A97B19 | | | 60045731D3658206F27451722716EF | | | THIS AND OTHER RELATED ENGINEERING DOCUMENTS CAN BE | | | FOUND HERE: HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBL | | | IC-WORKS/FORMS,-PERMITS-APPLICATIONS | | | ALSO SEE: CODE OF ORDINANCES, CITY OF WEST PALM BEACH, | | | FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, ADOPTED | | | SEPT. 22, 2008. (SUPPLEMENT NO. 18) | | | CHAPTER 90 UTILITIES, ARTICLE I. IN GENERAL, | | | SEC. 90-7. POLICY REGARDING EXTENSION OF WATER OR SEWER | | | SERVICE FACILITIES OF THE CITY. | | | 3. THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE | | | CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY | | | BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS, | | | BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION. | | | 4. PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY | | | OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC | | | RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF | | | YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE | | | MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL | | | IN THE WPB ENGINEERING SERVICES DEPARTMENT AT | | | [email protected] OR 561-494-1079 FOR FURTHER | | | ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION | | | ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD | | | SURVEY, POT-HOLING, SOFT DIGS ETC. | | | 5. AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH | | | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, | | | STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR | | | MORE INFORMATION, REFER TO THE LINK BELOW: | | | HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI | | | CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL | | | 6. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS | | | OF ALL WATER, STORM WATER, AND SANITARY AND SEWER | | | LINES, INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER | | | AND SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES, | | | METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE | | | SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING | | | GRADES, PIPES SIZES, MATERIALS, ELEVATIONS, | | | ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL | | | INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER | | | LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE | | | PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN | | | VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. | | | ADDITIONALLY, PLAN VIEW SHALL SHOW ALL EXISTING AND | | | PROPOSED UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER | | | OPTIC, ELECTRIC, GAS, AND CABLEVISION & | | | TELECOMMUNICATION FACILITIES LOCATED ON THE | | | RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL | | | UTILITY CROSSINGS. CUT AND CAP UTILITIES NOT IN USE, | | | AND REMOVE ANY ABANDONED UTILITY LINES LARGER THAN 2 | | | INCHES FROM CITY RIGHT OF WAY. | | | 7. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE | | | DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB | | | DEVELOPMENT APPLICATION). | | | 8. SHOW PROPOSED WATER MAINS IN CITY RIGHT OF WAY MADE | | | OF DUCTILE IRON PIPE (NOT PVC) AND SPECIFY PROPOSED | | | LENGTH IN FEET. | | | 9. PLEASE CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA | | | AND FIRE BACKFLOW PREVENTER AS DCDA. | | | 10. PROVIDE VERTICAL DATUM AND DATUM CONVERSION | | | INFORMATION (NAVD 1988 AND NGVD 1929). | | | 11. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND | | | PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM | | | AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE | | | PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER. | | | 12. PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER ALONG | | | ENTIRE PROJECT FRONTAGE. | | | 13. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY | | | SEWER ARE REQUIRED. | | | 14. PLEASE PROVIDE CLEANOUTS FOR PROPOSED SANITARY LINE | | | ONSITE JUST INSIDE PROPERTY LINE, AT JOINTS AND EVERY | | | 75 FEET. | | | 15. FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND | | | NPDES NOI REQUIREMENTS WILL BE ENFORCED. | | | - AN NOI IS REQUIRED FOR PROJECTS THAT: | | | - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS | | | THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF | | | DEVELOPMENT OR SALE; | | | - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE | | | STATE OR TO SURFACE WATERS OF THE STATE THROUGH A | | | MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4). | | | - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF | | | CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION | | | THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL | | | SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT | | | OF THE 10-2 CERTIFICATION. | | | 16. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | EASEMENT FOR PLACEMENT OF PROPOSED WATER METERS. | | | 17. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER | | | METER AND BACKFLOW PREVENTION. | | | 18. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES | | | OF WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS. | | | 19. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING | | | APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT | | | SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING | | | SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED | | | LEAD-FREE DESIGN. | | | 20. FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY LINES | | | ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY | | | LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT | | | PARCELS. | | | 21. FOR FORMAL ENGINEERING SUBMITTAL, IF WATER LINES | | | ARE BEING REPLACED IN ROW, SHOW ADJACENT PARCEL | | | ADDRESSES. | | | 22. FOR FORMAL ENGINEERING SUBMITTAL, ADD NOTE TO | | | PROVIDE 50 FT. PAVEMENT RESTORATION TRANSITION ON EACH | | | SIDE OF PROPOSED TRENCH IN CITY MAINTAINED ROADWAY | | | AREAS PER CITY OF WPB STANDARD DETAIL GC-8. | | | 23. FOR FORMAL ENGINEERING SUBMITTAL, SHOW DIMENSIONS | | | OF PROPOSED DUMPSTER PER CURRENT CITY OF WPB STANDARD | | | DETAIL GC-7. | | | 24. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | CALCULATIONS OF PERVIOUS AND IMPERVIOUS AREAS FOR | | | PROPOSED IMPROVED AREAS. | | | | | | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD | | | CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES, | | | PLEASE CONTACT 561-494-2262 OR [email protected]: | | | | | | -SEPARATE UTILITY PLAN NEEDS TO BE SUBMITTED SHOWING | | | EXISTING AND PROPOSED UTILITIES INCLUDING WATER AND | | | SEWER. | | | -THERE IS NOT EXISTING FIRELINE WATER SERVICE AT | | | PROPERTY. WILL NEED TAP AND DCDA. | | | -NEED TO REPLACE EXISTING DOMESTIC BACKFLOW ASSEMBLY. | | | -SOME TREES LOOK CLOSE TO UTILITY PIPING. ADD ROOT | | | BARRIERS IF ROOT HAS CHANCE OF GROWING INTO PIPE. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES | | | DEPT., DIRECT: (561) 494-1098 [email protected] | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
5 |
Status |
P |
Date |
09-22-2022 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
09-22-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
09-22-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-09-22 09:59:23 | PASS WITH PROVISOS FOR FORMAL ENGINEERING SUBMITTAL | | | PLANS: | | | | | | SHEET C-5 | | | | | | 1. PAVEMENT RESTORATION NOTE WOULD APPLY TO WORK IN | | | CITY OF WPB ROADWAY; HOWEVER, 45TH ST. IS A PB COUNTY | | | ROADWAY. PLEASE CONFIRM WITH PB COUNTY AND SHOW | | | PAVEMENT RESTORATION NOTE FOR 45TH ST. PER THEIR | | | PAVEMENT RESTORATION REQUIREMENTS. | | | 2. FOR SIDEWALK RESTORATION, UNABLE TO LOCATE | | | REFERENCE TO CITY STANDARD DETAIL GC-1 PER RESPONSE | | | LETTER. PLEASE UPDATE NOTE ON PLANS WITH ENGINEERING | | | PLAN SUBMITTAL. | | | | | | | | | RICK ROSSANO, SR. PROJ. COORDINATOR | | | CITY OF WPB ENG. SERVICES | | | [email protected] |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
4 |
Status |
F |
Date |
03-03-2022 |
|
|
Cont ID |
|
| Sent By |
ldeloren |
Date |
03-03-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
ldeloren |
Date |
03-03-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-03-03 07:30:56 | Z20040015 - IMECA HARDWARE, 3200 45TH ST. ? RESUB ? | | | 3-1-22 | | | | | | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES | | | DEPT., DIRECT: (561) 494-1098 [email protected] | | | | | | PASS WITH PROVISO: | | | | | | 1. PAVEMENT RESTORATION NOTE WOULD APPLY TO WORK IN | | | ROADWAY. FOR SIDEWALK RESTORATION, PLEASE REFER TO CITY | | | STANDARD DETAIL GC-1 AND UPDATE NOTE ON PLANS. | | | | | | | | | MARK HURLEY, FIELD CUSTOMER SERVICE SUPERVISOR; | | | 561-822-2262 [email protected] | | | 1. WITH RESPECT TO FIRELINE SIZING, PLAN SHEETS DO NOT | | | ALL MATCH. SOME SAY 4 INCH FIRELINE AND PIPING AND | | | OTHERS SAY 6 INCH. PLEASE MAKE SURE ALL PLANS MATCH. | | | DCDA SHOULD BE SAME SIZING AS UPSTREAM SERVICE PIPING. | | | 2. ON LANDSCAPING PLAN A BUSH APPEARS TO BE PLANTED ON | | | PROPOSED WATER METER BOX. | | | 3. LANDSCAPING PLAN DOES NOT SHOW THE FDC AND CONCRETE | | | POLE NEAR NORTHWEST AREA OF PROPERTY. | | | 4. LANDSCAPING PLAN SHOWS 2 HORSE PUMP STATION AT WEST | | | SIDE OF PROPOSED BUILDING. PLEASE DESCRIBE WHAT IT IS | | | USED FOR. | | | 5. BELIEVE THAT A BUILDING IS BEING DEMOLISHED, BUT DID | | | NOT SEE A DEMO PLAN. PLEASE INCLUDE DEMO PLAN WITH | | | CIVIL PLAN SET AT FORMAL ENGINEERING SUBMITTAL | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
3 |
Status |
F |
Date |
10-13-2021 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
10-13-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
10-13-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-10-13 11:32:50 | COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR, ENG. | | | SERVICES DEPT., 561-494-1098 [email protected] : | | | | | | 1. CONFIRM THAT A COMPLETED LOS ANALYSIS SUMMARY TABLE | | | HAS BEEN SUBMITTED DIRECTLY TO ENGINEERING (SHEET 33 OF | | | CITY OF WPB DEVELOPMENT APPLICATION). | | | 2. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY | | | SEWER ARE REQUIRED. | | | 3. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND | | | IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED | | | AREAS. | | | 4. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE | | | SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING | | | PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT | | | HIM AT 561-494-2262 OR [email protected] | | | 5. FOR FORMAL ENGINEERING SUBMITTAL , PLANS SHALL SHOW | | | PROPOSED LOCATIONS AND DIMENSIONS OF ALL WATER, | | | STORMWATER, AND SANITARY AND SEWER LINES, INCLUDING | | | STUBS TO EACH PROPERTY LINE FOR WATER AND SANITARY | | | SEWERS, THE MAKE AND MODEL OF ALL VALVES, METERS, AND | | | OTHERS DEVICES TO BE INSTALLED ON THE SYSTEM, CATCH | | | BASINS, CULVERTS, DITCHES INCLUDING GRADES, PIPES | | | SIZES, MATERIALS, ELEVATIONS, ASSUMPTIONS, | | | CALCULATIONS, INVERT ELEVATIONS FOR ALL INLETS AND | | | MANHOLES AND PROFILES OF SANITARY SEWER LINES. ALL | | | AVAILABLE ELEVATION SHALL BE SHOWN ON THE PROFILE VIEW. | | | DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN | | | VIEW FOR ALL SANITARY AND STORM SEWERS. ADDITIONALLY, | | | PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED | | | UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC, | | | ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION | | | FACILITIES LOCATED ON THE RIGHT-OF-WAY. | | | 6. FOR FORMAL ENGINEERING SUBMITTAL , PROVIDE DEDICATED | | | UTILITY EASEMENTS TO ALLOW ACCESS FOR CITY PERSONNEL TO | | | PROPOSED UTILITY WATER METERS. | | | 7. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER | | | METER AND BACKFLOW PREVENTION. | | | 8. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE CALLOUT | | | DOMESTIC BACKFLOW PREVENTER AS RPPA AND FIRE BACKFLOW | | | PREVENTER AS DCDA. SPECIFY LEAD FREE DESIGN ON ALL | | | BACKFLOWS. | | | 9. FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND | | | NPDES NOI REQUIREMENTS WILL BE ENFORCED. | | | - AN NOI IS REQUIRED FOR PROJECTS THAT: | | | - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS | | | THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF | | | DEVELOPMENT OR SALE; AND | | | - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE | | | STATE OR TO SURFACE WATERS OF THE STATE THROUGH A | | | MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4). | | | - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF | | | CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION | | | THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL | | | SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT | | | OF THE 10-2 CERTIFICATION. IF THE ENGINEERING PLANS DO | | | NOT INCLUDE AN EROSION CONTROL PLAN, THEN THE | | | CONTRACTOR SHOULD SUBMIT ONE PRIOR TO RECEIVING THE | | | ENGINEERING PERMIT. | | | 10. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES | | | OF PROPOSED AND EXISTING WATER AND SEWER WITHIN RIGHT | | | OF WAY AND SHOW ANY CROSSINGS/CONFLICTS. | | | 11. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING | | | APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT | | | SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING | | | SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED | | | LEAD-FREE DESIGN. | | | 12. FOR FORMAL ENGINEERING SUBMITTAL CLEARLY LABEL ROAD | | | RIGHT OF WAY. | | | 13. UPDATE PAVEMENT RESTORATION NOTE GC-8 TO CURRENT | | | VERSION. CONTACT [email protected] FOR CAD FILES. | | | 14. PLEASE RESPOND TO ALL COMMENTS IN WRITING AND | | | INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER | | | (Z-XXXXXXXX). | | | | | | COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE | | | SUPER., WPB PUBLIC UTILITIES, 561-494-2262 OR | | | [email protected]: | | | | | | FOLLOWUP COMMENTS: | | | | | | VERIFY NO CONFLICTS OF WATER UTILITIES WITH LARGE | | | WOODEN AND CONCRETE TELEPHONE POLES. HISTORIC PICTURE | | | SHOWS SOME AROUND NW CORNER OF PROPERTY. | | | RESPONSE: THE PROPOSED 4? FIRE LINE CONNECTION WAS | | | RELOCATED APPROXIMATELY 20? TO THE EAST, ELIMINATING | | | THE CONFLICT WITH THE EXISTING CONCRETE POLE. | | | PLEASE SHOW AND LABEL THE LARGE WOODEN AND CONCRETE | | | POLES ON THE PLANS. ADD NOTATION IF THEY ARE BEING | | | REMOVED OR RELOCATED. | | | | | | DID NOT SEE SEPARATE IRRIGATION WATER SERVICE ON CIVIL | | | PLANS. WILL ONE BE NEEDED? | | | RESPONSE: A 2? WELL AND A 2-HORSEPOWER PUMP WILL BE | | | USED FOR IRRIGATION. | | | SHOW AND LABEL THE WELL LOCATION ON PLANS. | | | | | | NEW COMMENTS: | | | | | | -DID NOT SEE LANDSCAPING PLAN. PLEASE SUBMIT AND SHOW | | | UTILITIES ON IT AS WELL. | | | | | | -FOR FORMAL ENGINEERING SUBMITTAL: ADD SLOPE GUIDANCE | | | TO SEWER LATERAL LABEL, LABEL ALL EXISTING WATER AND | | | SEWER UTILITIES IN RIGHT OF WAY WITH PIPE SIZE AND | | | MATERIAL TYPE, ADD NOTE THAT METER BOX IN SIDEWALK | | | REQUIRES 6 INCH CONCRETE POUR, REVISE BOUNDARY OF | | | SIDEWALK REPLACEMENT SO FLAG LINE IS NOT IN MIDDLE OF | | | METER BOX, AND VERIFY ALL FRANCHISE UTILITIES IN | | | UTILITY EASEMENT AND RIGHT OF WAY ARE SHOWN ON UTILITY | | | PLAN. | | | | | | -WILL THE CURBING ON 45TH ST BE ALTERED? CANNOT TELL IF | | | DRIVEWAY APPROACH IS SHIFTING. | | | | | | COMMENTS FROM MICHAEL TECHNOW, PROJECT ENGINEER, WPB | | | PUBLIC UTILITIES, 561-494-1047, [email protected] | | | | | | -ADD NOTE TO CONFIRM CONDITION OF THE 6? WW LINE, REHAB | | | AND REPLACE AS REQUIRED. | | | -CALL OUT TAPPING TEE AND VALVE ON FIRE LINE. | | | -CALL OUT THE SIZE OF THE FIRE LINE. | | | -FIRE LINE COMMENT: WHY NOT GO STRAIGHT? | | | -CALL OUT POINT OF SERVICE. | | | -ON PROFILE SHOW ?PUBLIC? SIDE FROM TAP TO POINT OF | | | SERVICE. | | | -WHAT IS ?CC?? CALL OUT DRY UTILITIES. | | | -PROVIDE POST CCTV OF LATERALS. | | | -ADD NOTE TO CUT AND CAP ABANDONED WATER AND SEWER | | | SERVICES AT THE MAIN. | | | -SHOW EXISTING SEWER LATERAL FROM CLEANOUT TO EXISTING | | | MAIN ON 45TH ST. | | | -SHOW CONCRETE POLE NEAR 3 METER BOXES. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | | | | | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
F |
Date |
10-30-2020 |
|
|
Cont ID |
|
| Sent By |
RROSSANO |
Date |
10-30-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
10-30-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-10-30 08:11:07 | THE FOLLOWING COMMENTS ARE FROM RICK ROSSANO, PROJECT | | | COORDINATOR, ENGINEERING SERVICES DEPT., DIRECT: (561) | | | 494-1098 [email protected] | | | | | | 1. PLEASE ADD ADDRESS TO COVER SHEET. | | | 2. PROVIDE VERTICAL DATUM AND DATUM CONVERSION | | | INFORMATION (NAVD 1988 AND NGVD 1929) ON SHEETS C-8 AND | | | C-11. | | | 3. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND | | | PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM | | | AND PEAK) AND FIRE FLOW DEMANDS ON SHEETS C-8 AND C-11. | | | CALCULATIONS SHALL BE PER FAC 64E-6 FOR SEWER AND PER | | | FAC 64-E.008 FOR WATER. | | | 4. PLEASE CLEAN UP ENLARGED VIEW ON PLANS OF PROPOSED | | | LOCATION OF WATER METER AND BACKFLOW PREVENTION. | | | 5. SHEET C-14: ADD BMP ITEMS SHOWN ON SWPPP DETAIL | | | SHEET C-15 ? TRUCK WASHDOWN PAD, ETC. ALSO ADD FILTER | | | FABRIC TO DRAINAGE INLET JUST WEST OF PROJECT ENTRANCE | | | ON SOUTH SIDE OF 45TH ST. | | | | | | | | | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD | | | CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES, | | | PLEASE CONTACT 561-494-2262 OR [email protected]: | | | | | | -DID NOT SEE SEPARATE IRRIGATION WATER SERVICE ON CIVIL | | | PLANS. WILL ONE BE NEEDED? | | | | | | -PLEASE ADD SIZING TO WATER MAIN LABEL. IT IS MISSING | | | FROM SOME OF THE PLANS. | | | | | | -SHOW AND LABEL DISTANCE BETWEEN FIRE WATER SERVICE AND | | | WASTEWATER SERVICE IN ROW. | | | | | | -PLEASE ADD ADDRESS TO SHEET C-8. | | | | | | -BACKFLOW ASSEMBLIES MAY NOT BE LOCATED IN UTILITY | | | EASEMENTS. APPEARS TO BE IN 10? UE ? PLEASE RELOCATE. | | | | | | -VERIFY NO CONFLICTS OF WATER UTILITIES WITH LARGE | | | WOODEN AND CONCRETE TELEPHONE POLES. HISTORIC PICTURE | | | SHOWS SOME AROUND NW CORNER OF PROPERTY. | | | | | | -WATER MAIN MAY BE FURTHER SOUTH THAN SHOWN ON PLANS. | | | MAY HELP TO VERIFY LOCATION SO WILL KNOW IF OUT OF | | | ROADWAY FOR SURE. | | | | | | -WATER SERVICE STANDARD DETAILS ARE OLD REVISION ? | | | PLEASE REPLACE WITH LATEST REVISION. | | | | | | -EXISTING DOMESTIC WATER SERVICE DOES NOT HAVE UTILITY | | | BILLING ACCOUNTS SETUP FOR ACTIVE USAGE. WOULD HAVE TO | | | SETUP ACCOUNTS AND PAY ANY APPLICABLE FEES, CHARGES, | | | AND DEPOSITS. | | | | | | -IF REPLACING SIDEWALK, NEED TO RELOCATE METER BOX OUT | | | OF SIDEWALK AND INTO GRASSY AREA WITHIN UTILITY | | | EASEMENT. EXISTING ASSOCIATED BACKFLOW ASSEMBLY NEEDS | | | TO BE REPLACED TO LEAD-FREE COMPLIANT RP ASSEMBLY ? | | | UPDATE C-8 NOTE 5 THAT ALL CONTAINMENT BACKFLOW | | | ASSEMBLIES MUST BE LEAD-FREE, USC APPROVED, AND RP TYPE | | | ON THE DOMESTIC WATER LINE. | | | | | | -ADD WATER DEMAND LOS INFORMATION TO WATER & UTILITY | | | PLANS. | | | | | | -SHEET C-8 SHOWS ELEVATIONS, BUT DOES NOT HAVE DATUM | | | INFORMATION INCLUDED. PLEASE ADD. | | | | | | -EXISTING UTILITY EASEMENT APPEARS TO OVERLAP WITH | | | LANDSCAPE BUFFER ON NORTH SIDE OF PROPERTY. VERIFY | | | THERE WILL BE NO CONFLICTS WITH TREES AND METER BOXES, | | | PIPING, AND BACKFLOW ASSEMBLIES. | | | | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES | | | DEPT., DIRECT: (561) 494-1098 [email protected] | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
05-12-2020 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
05-12-2020 |
Time |
|
Rev Time |
|
| Received By |
rrossano |
Date |
05-12-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-05-14 07:33:19 | 1. PLEASE RESPOND TO ALL COMMENTS IN WRITING, AND | | | INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER | | | (Z-XXXXXXXX). | | | 2. THE CITY OF WEST PALM BEACH HAS A NUMBER OF | | | REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY | | | AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND | | | WASTEWATER UTILITIES WITHIN THE CITY. PLEASE SEE | | | DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AT THE LINK | | | BELOW: | | | HTTP://WPB.ORG/CMSPAGES/GETAMAZONFILE.ASPX?PATH=~\WPB_W | | | EBSITE\MEDIA\ENGINEERING\DEVELOPMENT-APPLICATION-FULL-P | | | ACKAGE_2016.PDF&HASH=7BD4DD7EB6115181D8C5977BCC02A97B19 | | | 60045731D3658206F27451722716EF | | | THIS AND OTHER RELATED ENGINEERING DOCUMENTS CAN BE | | | FOUND HERE: HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBL | | | IC-WORKS/FORMS,-PERMITS-APPLICATIONS | | | ALSO SEE: CODE OF ORDINANCES, CITY OF WEST PALM BEACH, | | | FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, ADOPTED | | | SEPT. 22, 2008. (SUPPLEMENT NO. 18) | | | CHAPTER 90 UTILITIES, ARTICLE I. IN GENERAL, | | | SEC. 90-7. POLICY REGARDING EXTENSION OF WATER OR SEWER | | | SERVICE FACILITIES OF THE CITY. | | | 3. THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE | | | CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY | | | BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS, | | | BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION. | | | 4. PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY | | | OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC | | | RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF | | | YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE | | | MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL | | | IN THE WPB ENGINEERING SERVICES DEPARTMENT AT | | | [email protected] OR 561-494-1079 FOR FURTHER | | | ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION | | | ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD | | | SURVEY, POT-HOLING, SOFT DIGS ETC. | | | 5. AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH | | | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, | | | STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR | | | MORE INFORMATION, REFER TO THE LINK BELOW: | | | HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI | | | CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL | | | 6. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS | | | OF ALL WATER, STORM WATER, AND SANITARY AND SEWER | | | LINES, INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER | | | AND SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES, | | | METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE | | | SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING | | | GRADES, PIPES SIZES, MATERIALS, ELEVATIONS, | | | ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL | | | INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER | | | LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE | | | PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN | | | VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. | | | ADDITIONALLY, PLAN VIEW SHALL SHOW ALL EXISTING AND | | | PROPOSED UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER | | | OPTIC, ELECTRIC, GAS, AND CABLEVISION & | | | TELECOMMUNICATION FACILITIES LOCATED ON THE | | | RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL | | | UTILITY CROSSINGS. CUT AND CAP UTILITIES NOT IN USE, | | | AND REMOVE ANY ABANDONED UTILITY LINES LARGER THAN 2 | | | INCHES FROM CITY RIGHT OF WAY. | | | 7. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE | | | DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB | | | DEVELOPMENT APPLICATION). | | | 8. SHOW PROPOSED WATER MAINS IN CITY RIGHT OF WAY MADE | | | OF DUCTILE IRON PIPE (NOT PVC) AND SPECIFY PROPOSED | | | LENGTH IN FEET. | | | 9. PLEASE CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA | | | AND FIRE BACKFLOW PREVENTER AS DCDA. | | | 10. PROVIDE VERTICAL DATUM AND DATUM CONVERSION | | | INFORMATION (NAVD 1988 AND NGVD 1929). | | | 11. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND | | | PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM | | | AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE | | | PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER. | | | 12. PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER ALONG | | | ENTIRE PROJECT FRONTAGE. | | | 13. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY | | | SEWER ARE REQUIRED. | | | 14. PLEASE PROVIDE CLEANOUTS FOR PROPOSED SANITARY LINE | | | ONSITE JUST INSIDE PROPERTY LINE, AT JOINTS AND EVERY | | | 75 FEET. | | | 15. FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND | | | NPDES NOI REQUIREMENTS WILL BE ENFORCED. | | | - AN NOI IS REQUIRED FOR PROJECTS THAT: | | | - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS | | | THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF | | | DEVELOPMENT OR SALE; | | | - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE | | | STATE OR TO SURFACE WATERS OF THE STATE THROUGH A | | | MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4). | | | - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF | | | CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION | | | THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL | | | SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT | | | OF THE 10-2 CERTIFICATION. | | | 16. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | EASEMENT FOR PLACEMENT OF PROPOSED WATER METERS. | | | 17. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER | | | METER AND BACKFLOW PREVENTION. | | | 18. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES | | | OF WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS. | | | 19. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING | | | APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT | | | SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING | | | SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED | | | LEAD-FREE DESIGN. | | | 20. FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY LINES | | | ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY | | | LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT | | | PARCELS. | | | 21. FOR FORMAL ENGINEERING SUBMITTAL, IF WATER LINES | | | ARE BEING REPLACED IN ROW, SHOW ADJACENT PARCEL | | | ADDRESSES. | | | 22. FOR FORMAL ENGINEERING SUBMITTAL, ADD NOTE TO | | | PROVIDE 50 FT. PAVEMENT RESTORATION TRANSITION ON EACH | | | SIDE OF PROPOSED TRENCH IN CITY MAINTAINED ROADWAY | | | AREAS PER CITY OF WPB STANDARD DETAIL GC-8. | | | 23. FOR FORMAL ENGINEERING SUBMITTAL, SHOW DIMENSIONS | | | OF PROPOSED DUMPSTER PER CURRENT CITY OF WPB STANDARD | | | DETAIL GC-7. | | | 24. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | CALCULATIONS OF PERVIOUS AND IMPERVIOUS AREAS FOR | | | PROPOSED IMPROVED AREAS. | | | | | | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD | | | CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES, | | | PLEASE CONTACT 561-494-2262 OR [email protected]: | | | | | | -SEPARATE UTILITY PLAN NEEDS TO BE SUBMITTED SHOWING | | | EXISTING AND PROPOSED UTILITIES INCLUDING WATER AND | | | SEWER. | | | -THERE IS NOT EXISTING FIRELINE WATER SERVICE AT | | | PROPERTY. WILL NEED TAP AND DCDA. | | | -NEED TO REPLACE EXISTING DOMESTIC BACKFLOW ASSEMBLY. | | | -SOME TREES LOOK CLOSE TO UTILITY PIPING. ADD ROOT | | | BARRIERS IF ROOT HAS CHANCE OF GROWING INTO PIPE. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES | | | DEPT., DIRECT: (561) 494-1098 [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
4 |
Status |
P |
Date |
09-22-2022 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
09-22-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
09-22-2022 |
Time |
10:02 |
Sent To |
|
|
| Notes |
| 2022-09-22 10:02:58 | AFTER A REVIEW OF THE PPRC RESPONSE PACKET FOR THIS | | | PROJECT, THE PREVIOUSLY SUBMITTED FIRE PREVENTION | | | BUREAU COMMENTS APPEAR TO HAVE BEEN ADDRESSED. | | | | | | HOWEVER, THE BUREAU'S APPROVAL OF THIS SUBMITTED | | | PROJECT DOES NOT CONSTITUTE ITS FINAL REVIEW OR | | | APPROVAL. | | | | | | THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT | | | THE APPROPRIATE TIME AND IN ACCORDANCE WITH THE | | | REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | WEST PALM BEACH FIRE DEPARTMENT | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
03-09-2022 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
03-09-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
03-09-2022 |
Time |
16:26 |
Sent To |
|
|
| Notes |
| 2022-03-09 16:27:01 | FIRE HAS NO FURTHER OBJECTIONS OR CONCERNS TO THE | | | PROPOSED AND APPROVES. | | | | | | FIRE'S APPROVAL OF THIS SUBMITTED PROJECT DOES NOT | | | CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | FIRE SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT THE | | | APPROPRIATE TIME AND IN ACCORDANCE WITH THE | | | REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
09-09-2021 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
09-09-2021 |
Time |
11:56 |
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
09-09-2021 |
Time |
11:56 |
Sent To |
|
|
| Notes |
| 2021-09-09 11:57:58 | FIRE HAS NO FURTHER OBJECTIONS OR CONCERNS TO THE | | | PROPOSED AND APPROVES. | | | | | | FIRE'S APPROVAL OF THIS SUBMITTED PROJECT DOES NOT | | | CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | FIRE SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT THE | | | APPROPRIATE TIME AND IN ACCORDANCE WITH THE | | | REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
05-11-2020 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
05-11-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
05-11-2020 |
Time |
10:45 |
Sent To |
|
|
| Notes |
| 2020-05-11 11:15:35 | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, | | | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM | | | BEACH FIRE RESCUE. | | | | | | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE | | | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. | | | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS | | | ARE SUBMITTED FOR PERMIT. | | | | | | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE | | | PROPOSED PROJECT. | | | | | | 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY | | | WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE | | | PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A | | | PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED | | | TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN | | | STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY | | | MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER | | | PROTECTION. | | | | | | 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY | | | IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING | | | ALL CONSTRUCTION ACTIVITIES. | | | | | | 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM | | | ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION. | | | ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND | | | AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT | | | WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS. | | | | | | 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE | | | REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE | | | ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS. | | | | | | 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH | | | THE 6TH EDITION OF THE FLORIDA FIRE PREVENTION CODE, | | | INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES. | | | | | | 6. FOR PLAN REVIEW SUBMITTAL, PLEASE INCLUDE THE | | | OCCUPANCY TYPE, PER THE FLORIDA FIRE PREVENTION CODE, | | | AND WHETHER IT WILL BE MIXED OR SEPARATED. | | | | | | 7. FOR PLAN REVIEW SUBMITTAL, PLEASE ENSURE THAT A FIRE | | | LOAD CALCULATION IS INCLUDED AND THAT ADEQUATE WATER | | | SUPPLY IS EXISTING OR WILL BE PROVIDED. | | | | | | 8. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED | | | ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF | | | FIRE PREVENTION. | | | | | | 9. FOR PLAN REVIEW SUBMITTAL, PLEASE ENSURE THAT THE | | | RACK DETAIL IS INCLUDED, INCLUDING STORAGE COMMADITY | | | TYPE, PALLET TYPE, SHELVING TYPE, RACK HEIGHT, ETC. | | | | | | IF REQUIRED, PROVIDE FOR A FIRE SPRINKLER AND/OR FIRE | | | ALARM PER THE APPLICABLE OCCUPANCY CODE. FOR ANY LIFE | | | SAFETY ENGINEERED SYSTEM, I.E FIRE SPRINKLER AND FIRE | | | ALARM, ENSURE THEY COMPLY WITH THE REQUIREMENTS OF FS | | | 61G AND SUBMITTED WITH THE MASTER PERMIT. | | | | | | 9A) THE LOCATION OF ANY APPLICABLE DDCV AND FIRE LINE | | | LOCATIONS SHALL MEET THE REQUIREMENTS OF NFPA 24 AND | | | SHALL BE COORDINATED WITH THE OFFICE OF FIRE MARSHAL, | | | THE CITY'S ENGINEERS OFFICE, THE LANDSCAPE PLANNER, AND | | | THE CITY'S PLANNING AND ZONING OFFICE. | | | | | | 10. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL | | | BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL | | | DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS, | | | EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A | | | PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE | | | SAFETY FEATURES AND EQUIPMENT. | | | | | | 11. IT IS HIGHLY RECOMMENDED (REQUIRED WITH FIRE | | | SPRINKLER SYSTEM) THAT A KNOX BOX WITH KEYS FOR ENTRY | | | DOOR LOCKS BE PROVIDED FOR 24 HOUR EMERGENCY ACCESS. | | | | | | 11B.) A TURNING RADII WAS NOT INDICATED IN THE PARKING | | | LOT SITE VIEW, A 30' RADIUS WOULD BE REQUIRED FOR FIRE | | | APPARATUS TO NAVIGATE THE PARKING AREA. | | | | | | 12. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT | | | DOES NOT CONSTITUTE ITS FINAL REVIEW OR APPROVAL. | | | | | | 13. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING | | | PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH | | | THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
5 |
Status |
P |
Date |
09-27-2022 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
09-27-2022 |
Time |
14:39 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
09-27-2022 |
Time |
14:39 |
Sent To |
|
|
| Notes |
| 2022-09-27 14:40:28 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 3200 45TH ST Z20040015 | | | SEPTEMBER 27, 2022 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. SATISFIED. PROVIDE A TREE DISPOSITION PLAN. TREES | | | WITHIN THE PROPERTY MUST BE IDENTIFIED AND SHOWN | | | WHETHER THEY WILL REMAIN, BE REMOVED OR RELOCATED. ANY | | | TREES TO REMAIN MUST BE INCLUDED ON THE PLANT LIST. | | | | | | 2. SATISFIED. REQUIRED OPEN SPACE FOR INDUSTRIAL ZONING | | | IS 40% EQUALING 16,868 SQ FT. REVISE ON PLAN AND | | | RECALCULATE REQUIRED TREES AND SHRUBS. REQUIRED | | | PERVIOUS LANDSCAPE AREA IS A SEPARATE LINE ITEM. | | | | | | 3. SATISFIED. PROVIDE LOCATIONS OF LIGHTING ON THE | | | LANDSCAPE PLAN TO AVOID CONFLICTS WITH LANDSCAPING. | | | | | | 4. SATISFIED. SHOW LOCATION OF SEWER LINE ON THE | | | LANDSCAPE PLAN AND RESOLVE CONFLICTS WITH LANDSCAPING. | | | | | | 5. SATISFIED. SHOW THAT THE REQUIRED PARKING LOT TREES | | | MEET THE 75% SHADE TREE REQUIREMENT. 5 TREES ARE | | | REQUIRED, 4 MUST BE CATEGORY 1. | | | | | | 6. SATISFIED. SHOW THE PARKING LANDSCAPE AREAS COUNTED | | | TOWARD COMPLIANCE WITH SECTION 94-443(C)(3) AND (4) FOR | | | THE AREAS WITHIN THE PARKING FIELD, AND MATCH THE TOTAL | | | SHOWN ON THE REQUIREMENT CHART TO MEETING THE TOTAL OF | | | BOTH SECTIONS ADDED TOGETHER. | | | PROVIDE AN EXHIBIT IDENTIFYING THE PARKING SPACES, | | | OTHER VEHICULAR USE AREAS AND SHOWING THE AREAS COUNTED | | | TOWARD INTERIOR LANDSCAPING. SEE FIGURE XIV-1 IN | | | SECTION 94-443 TO IDENTIFY AREAS. | | | | | | 7. SATISFIED. ALL LANDSCAPE ISLANDS MUST MEET THE | | | REQUIRED LANDSCAPE WIDTH OF 8 FEET INSIDE D CURB AND BE | | | THE FULL LENGTH OF THE ADJACENT PARKING SPACE INCLUDING | | | THE 6 INCH D CURB. | | | | | | 8. SATISFIED. ALL PAVED VEHICULAR USE AREAS ADJACENT TO | | | LANDSCAPE AREAS MUST MEET THE CODE REQUIREMENT OF A | | | TYPE D NON MOUNTABLE CURB PER SECTION 94-443(C)(5) OR | | | SIMILAR. | | | | | | 9. SATISFIED. IF THE OVERHEAD ELECTRIC LINES ARE TO | | | REMAIN ALONG THE EAST PROPERTY LINE, THE GUMBO LIMBO | | | TREES MAY NOT MEET THE RIGHT TREE RIGHT PLACE | | | REQUIREMENTS. | | | | | | 10. SATISFIED. PLEASE CORRECT THE FLORIDA FRIENDLY | | | LANDSCAPE CHART TO REFLECT CURRENT CODE REQUIREMENT OF | | | 50 POINTS USING THE DESIGN OPTIONS CONSISTENT WITH | | | CURRENT CODE 94-442(G). | | | | | | 11. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L. | | | PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT | | | MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT | | | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE | | | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH | | | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH | | | FLORIDA LANDSCAPES. | | | PROVIDE THE ACTUAL PERCENTAGE ON THE PLAN BASED ON THE | | | PLANT LIST. | | | | | | ADDITIONAL COMMENTS 9/13/21: | | | | | | 12. SATISFIED. SUBMIT REVISED LANDSCAPE PLANS MATCHING | | | THE UPDATED SITE PLAN CHANGES FOR THE ENTRANCE WIDTH | | | AND SIGNAGE LOCATION. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
4 |
Status |
P |
Date |
03-09-2022 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
03-09-2022 |
Time |
16:23 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
03-09-2022 |
Time |
16:23 |
Sent To |
|
|
| Notes |
| 2022-03-09 16:24:29 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 3200 45TH ST Z20040015 | | | SEPTEMBER 13, 2021 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. SATISFIED. PROVIDE A TREE DISPOSITION PLAN. TREES | | | WITHIN THE PROPERTY MUST BE IDENTIFIED AND SHOWN | | | WHETHER THEY WILL REMAIN, BE REMOVED OR RELOCATED. ANY | | | TREES TO REMAIN MUST BE INCLUDED ON THE PLANT LIST. | | | | | | 2. SATISFIED. REQUIRED OPEN SPACE FOR INDUSTRIAL ZONING | | | IS 40% EQUALING 16,868 SQ FT. REVISE ON PLAN AND | | | RECALCULATE REQUIRED TREES AND SHRUBS. REQUIRED | | | PERVIOUS LANDSCAPE AREA IS A SEPARATE LINE ITEM. | | | | | | 3. SATISFIED. PROVIDE LOCATIONS OF LIGHTING ON THE | | | LANDSCAPE PLAN TO AVOID CONFLICTS WITH LANDSCAPING. | | | | | | 4. SATISFIED. SHOW LOCATION OF SEWER LINE ON THE | | | LANDSCAPE PLAN AND RESOLVE CONFLICTS WITH LANDSCAPING. | | | | | | 5. SATISFIED. SHOW THAT THE REQUIRED PARKING LOT TREES | | | MEET THE 75% SHADE TREE REQUIREMENT. 5 TREES ARE | | | REQUIRED, 4 MUST BE CATEGORY 1. | | | | | | 6. SATISFIED. SHOW THE PARKING LANDSCAPE AREAS COUNTED | | | TOWARD COMPLIANCE WITH SECTION 94-443(C)(3) AND (4) FOR | | | THE AREAS WITHIN THE PARKING FIELD, AND MATCH THE TOTAL | | | SHOWN ON THE REQUIREMENT CHART TO MEETING THE TOTAL OF | | | BOTH SECTIONS ADDED TOGETHER. | | | PROVIDE AN EXHIBIT IDENTIFYING THE PARKING SPACES, | | | OTHER VEHICULAR USE AREAS AND SHOWING THE AREAS COUNTED | | | TOWARD INTERIOR LANDSCAPING. SEE FIGURE XIV-1 IN | | | SECTION 94-443 TO IDENTIFY AREAS. | | | | | | 7. SATISFIED. ALL LANDSCAPE ISLANDS MUST MEET THE | | | REQUIRED LANDSCAPE WIDTH OF 8 FEET INSIDE D CURB AND BE | | | THE FULL LENGTH OF THE ADJACENT PARKING SPACE INCLUDING | | | THE 6 INCH D CURB. | | | | | | 8. SATISFIED. ALL PAVED VEHICULAR USE AREAS ADJACENT TO | | | LANDSCAPE AREAS MUST MEET THE CODE REQUIREMENT OF A | | | TYPE D NON MOUNTABLE CURB PER SECTION 94-443(C)(5) OR | | | SIMILAR. | | | | | | 9. SATISFIED. IF THE OVERHEAD ELECTRIC LINES ARE TO | | | REMAIN ALONG THE EAST PROPERTY LINE, THE GUMBO LIMBO | | | TREES MAY NOT MEET THE RIGHT TREE RIGHT PLACE | | | REQUIREMENTS. | | | | | | 10. SATISFIED. PLEASE CORRECT THE FLORIDA FRIENDLY | | | LANDSCAPE CHART TO REFLECT CURRENT CODE REQUIREMENT OF | | | 50 POINTS USING THE DESIGN OPTIONS CONSISTENT WITH | | | CURRENT CODE 94-442(G). | | | | | | 11. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L. | | | PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT | | | MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT | | | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE | | | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH | | | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH | | | FLORIDA LANDSCAPES. | | | PROVIDE THE ACTUAL PERCENTAGE ON THE PLAN BASED ON THE | | | PLANT LIST. | | | | | | ADDITIONAL COMMENTS 9/13/21: | | | | | | 12. SATISFIED. SUBMIT REVISED LANDSCAPE PLANS MATCHING | | | THE UPDATED SITE PLAN CHANGES FOR THE ENTRANCE WIDTH | | | AND SIGNAGE LOCATION. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
3 |
Status |
F |
Date |
09-13-2021 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
09-13-2021 |
Time |
12:36 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
09-13-2021 |
Time |
12:36 |
Sent To |
|
|
| Notes |
| 2021-09-13 12:37:25 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 3200 45TH ST Z20040015 | | | SEPTEMBER 13, 2021 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. SATISFIED. PROVIDE A TREE DISPOSITION PLAN. TREES | | | WITHIN THE PROPERTY MUST BE IDENTIFIED AND SHOWN | | | WHETHER THEY WILL REMAIN, BE REMOVED OR RELOCATED. ANY | | | TREES TO REMAIN MUST BE INCLUDED ON THE PLANT LIST. | | | | | | 2. SATISFIED. REQUIRED OPEN SPACE FOR INDUSTRIAL ZONING | | | IS 40% EQUALING 16,868 SQ FT. REVISE ON PLAN AND | | | RECALCULATE REQUIRED TREES AND SHRUBS. REQUIRED | | | PERVIOUS LANDSCAPE AREA IS A SEPARATE LINE ITEM. | | | | | | 3. SATISFIED. PROVIDE LOCATIONS OF LIGHTING ON THE | | | LANDSCAPE PLAN TO AVOID CONFLICTS WITH LANDSCAPING. | | | | | | 4. SATISFIED. SHOW LOCATION OF SEWER LINE ON THE | | | LANDSCAPE PLAN AND RESOLVE CONFLICTS WITH LANDSCAPING. | | | | | | 5. SATISFIED. SHOW THAT THE REQUIRED PARKING LOT TREES | | | MEET THE 75% SHADE TREE REQUIREMENT. 5 TREES ARE | | | REQUIRED, 4 MUST BE CATEGORY 1. | | | | | | 6. SATISFIED. SHOW THE PARKING LANDSCAPE AREAS COUNTED | | | TOWARD COMPLIANCE WITH SECTION 94-443(C)(3) AND (4) FOR | | | THE AREAS WITHIN THE PARKING FIELD, AND MATCH THE TOTAL | | | SHOWN ON THE REQUIREMENT CHART TO MEETING THE TOTAL OF | | | BOTH SECTIONS ADDED TOGETHER. | | | PROVIDE AN EXHIBIT IDENTIFYING THE PARKING SPACES, | | | OTHER VEHICULAR USE AREAS AND SHOWING THE AREAS COUNTED | | | TOWARD INTERIOR LANDSCAPING. SEE FIGURE XIV-1 IN | | | SECTION 94-443 TO IDENTIFY AREAS. | | | | | | 7. SATISFIED. ALL LANDSCAPE ISLANDS MUST MEET THE | | | REQUIRED LANDSCAPE WIDTH OF 8 FEET INSIDE D CURB AND BE | | | THE FULL LENGTH OF THE ADJACENT PARKING SPACE INCLUDING | | | THE 6 INCH D CURB. | | | | | | 8. SATISFIED. ALL PAVED VEHICULAR USE AREAS ADJACENT TO | | | LANDSCAPE AREAS MUST MEET THE CODE REQUIREMENT OF A | | | TYPE D NON MOUNTABLE CURB PER SECTION 94-443(C)(5) OR | | | SIMILAR. | | | | | | 9. SATISFIED. IF THE OVERHEAD ELECTRIC LINES ARE TO | | | REMAIN ALONG THE EAST PROPERTY LINE, THE GUMBO LIMBO | | | TREES MAY NOT MEET THE RIGHT TREE RIGHT PLACE | | | REQUIREMENTS. | | | | | | 10. SATISFIED. PLEASE CORRECT THE FLORIDA FRIENDLY | | | LANDSCAPE CHART TO REFLECT CURRENT CODE REQUIREMENT OF | | | 50 POINTS USING THE DESIGN OPTIONS CONSISTENT WITH | | | CURRENT CODE 94-442(G). | | | | | | 11. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L. | | | PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT | | | MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT | | | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE | | | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH | | | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH | | | FLORIDA LANDSCAPES. | | | PROVIDE THE ACTUAL PERCENTAGE ON THE PLAN BASED ON THE | | | PLANT LIST. | | | | | | ADDITIONAL COMMENTS 9/13/21: | | | | | | 12. SUBMIT REVISED LANDSCAPE PLANS MATCHING THE UPDATED | | | SITE PLAN CHANGES FOR THE ENTRANCE WIDTH AND SIGNAGE | | | LOCATION. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
P |
Date |
10-23-2020 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
10-23-2020 |
Time |
16:16 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
10-23-2020 |
Time |
16:16 |
Sent To |
|
|
| Notes |
| 2020-10-23 16:17:26 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 | | | PROJECT: 3200 45TH ST Z20040015 | | | OCTOBER 23, 2020 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. SATISFIED. PROVIDE A TREE DISPOSITION PLAN. TREES | | | WITHIN THE PROPERTY MUST BE IDENTIFIED AND SHOWN | | | WHETHER THEY WILL REMAIN, BE REMOVED OR RELOCATED. ANY | | | TREES TO REMAIN MUST BE INCLUDED ON THE PLANT LIST. | | | | | | 2. SATISFIED. REQUIRED OPEN SPACE FOR INDUSTRIAL ZONING | | | IS 40% EQUALING 16,868 SQ FT. REVISE ON PLAN AND | | | RECALCULATE REQUIRED TREES AND SHRUBS. REQUIRED | | | PERVIOUS LANDSCAPE AREA IS A SEPARATE LINE ITEM. | | | | | | 3. SATISFIED. PROVIDE LOCATIONS OF LIGHTING ON THE | | | LANDSCAPE PLAN TO AVOID CONFLICTS WITH LANDSCAPING. | | | | | | 4. SATISFIED. SHOW LOCATION OF SEWER LINE ON THE | | | LANDSCAPE PLAN AND RESOLVE CONFLICTS WITH LANDSCAPING. | | | | | | 5. SATISFIED. SHOW THAT THE REQUIRED PARKING LOT TREES | | | MEET THE 75% SHADE TREE REQUIREMENT. 5 TREES ARE | | | REQUIRED, 4 MUST BE CATEGORY 1. | | | | | | 6. SATISFIED. SHOW THE PARKING LANDSCAPE AREAS COUNTED | | | TOWARD COMPLIANCE WITH SECTION 94-443(C)(3) AND (4) FOR | | | THE AREAS WITHIN THE PARKING FIELD, AND MATCH THE TOTAL | | | SHOWN ON THE REQUIREMENT CHART TO MEETING THE TOTAL OF | | | BOTH SECTIONS ADDED TOGETHER. | | | PROVIDE AN EXHIBIT IDENTIFYING THE PARKING SPACES, | | | OTHER VEHICULAR USE AREAS AND SHOWING THE AREAS COUNTED | | | TOWARD INTERIOR LANDSCAPING. SEE FIGURE XIV-1 IN | | | SECTION 94-443 TO IDENTIFY AREAS. | | | | | | 7. SATISFIED. ALL LANDSCAPE ISLANDS MUST MEET THE | | | REQUIRED LANDSCAPE WIDTH OF 8 FEET INSIDE D CURB AND BE | | | THE FULL LENGTH OF THE ADJACENT PARKING SPACE INCLUDING | | | THE 6 INCH D CURB. | | | | | | 8. SATISFIED. ALL PAVED VEHICULAR USE AREAS ADJACENT TO | | | LANDSCAPE AREAS MUST MEET THE CODE REQUIREMENT OF A | | | TYPE D NON MOUNTABLE CURB PER SECTION 94-443(C)(5) OR | | | SIMILAR. | | | | | | 9. SATISFIED. IF THE OVERHEAD ELECTRIC LINES ARE TO | | | REMAIN ALONG THE EAST PROPERTY LINE, THE GUMBO LIMBO | | | TREES MAY NOT MEET THE RIGHT TREE RIGHT PLACE | | | REQUIREMENTS. | | | | | | 10. SATISFIED. PLEASE CORRECT THE FLORIDA FRIENDLY | | | LANDSCAPE CHART TO REFLECT CURRENT CODE REQUIREMENT OF | | | 50 POINTS USING THE DESIGN OPTIONS CONSISTENT WITH | | | CURRENT CODE 94-442(G). | | | | | | 11. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L. | | | PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT | | | MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT | | | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE | | | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH | | | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH | | | FLORIDA LANDSCAPES. | | | PROVIDE THE ACTUAL PERCENTAGE ON THE PLAN BASED ON THE | | | PLANT LIST. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
05-13-2020 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
05-13-2020 |
Time |
15:12 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
05-13-2020 |
Time |
15:12 |
Sent To |
|
|
| Notes |
| 2020-05-13 15:13:46 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 | | | PROJECT: 3200 45TH ST Z20040015 | | | MAY 13, 2020 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. PROVIDE A TREE DISPOSITION PLAN. TREES WITHIN THE | | | PROPERTY MUST BE IDENTIFIED AND SHOWN WHETHER THEY WILL | | | REMAIN, BE REMOVED OR RELOCATED. ANY TREES TO REMAIN | | | MUST BE INCLUDED ON THE PLANT LIST. | | | | | | 2. REQUIRED OPEN SPACE FOR INDUSTRIAL ZONING IS 40% | | | EQUALING 16,868 SQ FT. REVISE ON PLAN AND RECALCULATE | | | REQUIRED TREES AND SHRUBS. REQUIRED PERVIOUS LANDSCAPE | | | AREA IS A SEPARATE LINE ITEM. | | | | | | 3. PROVIDE LOCATIONS OF LIGHTING ON THE LANDSCAPE PLAN | | | TO AVOID CONFLICTS WITH LANDSCAPING. | | | | | | 4. SHOW LOCATION OF SEWER LINE ON THE LANDSCAPE PLAN | | | AND RESOLVE CONFLICTS WITH LANDSCAPING. | | | | | | 5. SHOW THAT THE REQUIRED PARKING LOT TREES MEET THE | | | 75% SHADE TREE REQUIREMENT. 5 TREES ARE REQUIRED, 4 | | | MUST BE CATEGORY 1. | | | | | | 6. SHOW THE PARKING LANDSCAPE AREAS COUNTED TOWARD | | | COMPLIANCE WITH SECTION 94-443(C)(3) AND (4) FOR THE | | | AREAS WITHIN THE PARKING FIELD, AND MATCH THE TOTAL | | | SHOWN ON THE REQUIREMENT CHART TO MEETING THE TOTAL OF | | | BOTH SECTIONS ADDED TOGETHER. | | | PROVIDE AN EXHIBIT IDENTIFYING THE PARKING SPACES, | | | OTHER VEHICULAR USE AREAS AND SHOWING THE AREAS COUNTED | | | TOWARD INTERIOR LANDSCAPING. SEE FIGURE XIV-1 IN | | | SECTION 94-443 TO IDENTIFY AREAS. | | | | | | 7. ALL LANDSCAPE ISLANDS MUST MEET THE REQUIRED | | | LANDSCAPE WIDTH OF 8 FEET INSIDE D CURB AND BE THE FULL | | | LENGTH OF THE ADJACENT PARKING SPACE INCLUDING THE 6 | | | INCH D CURB. | | | | | | 8. ALL PAVED VEHICULAR USE AREAS ADJACENT TO LANDSCAPE | | | AREAS MUST MEET THE CODE REQUIREMENT OF A TYPE D NON | | | MOUNTABLE CURB PER SECTION 94-443(C)(5) OR SIMILAR. | | | | | | 9. IF THE OVERHEAD ELECTRIC LINES ARE TO REMAIN ALONG | | | THE EAST PROPERTY LINE, THE GUMBO LIMBO TREES MAY NOT | | | MEET THE RIGHT TREE RIGHT PLACE REQUIREMENTS. | | | | | | 10. PLEASE CORRECT THE FLORIDA FRIENDLY LANDSCAPE CHART | | | TO REFLECT CURRENT CODE REQUIREMENT OF 50 POINTS USING | | | THE DESIGN OPTIONS CONSISTENT WITH CURRENT CODE | | | 94-442(G). | | | | | | 11. SHOW COMPLIANCE WITH SECTION 94-445 L. PLANT | | | SPECIES. A MINIMUM OF 60 PERCENT OF PLANT MATERIAL | | | ADDED SHALL BE FLORIDA NATIVE OR DROUGHT TOLERANT | | | SPECIES SELECTED FROM THE CITY LIST OR THE LIST OF | | | SPECIES IN THE MOST RECENT EDITION OF SOUTH FLORIDA | | | WATER MANAGEMENT DISTRICT WATERWISE SOUTH FLORIDA | | | LANDSCAPES. | | | PROVIDE THE ACTUAL PERCENTAGE ON THE PLAN BASED ON THE | | | PLANT LIST. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | | | | |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PU-CS |
PUBLIC UTILITIES CUSTOMER SRVC |
| Rev No |
1 |
Status |
P |
Date |
09-26-2022 |
|
|
Cont ID |
|
| Sent By |
mhurley |
Date |
09-26-2022 |
Time |
15:55 |
Rev Time |
0.00 |
| Received By |
mhurley |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
5 |
Status |
P |
Date |
10-05-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
10-05-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
10-05-2022 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
4 |
Status |
P |
Date |
04-18-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
04-18-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
04-18-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-04-18 14:52:20 | NO FURTHER COMMENTS FROM DEPARTMENT OF PUBLIC WORKS. | | | | | | MATT HEJAZI | | | [email protected] |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
3 |
Status |
F |
Date |
10-04-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
10-04-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
10-04-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-09-24 09:30:06 | THE AUTO TURN FOR THE SANITATION COLLECTION VEHICLE | | | MAJOR ENCROACHMENT WITH THE PROPOSED ENTERANCE/EXIT | | | MEDIAN, WHICH WILL CAUSE CURB/VEHICLE DAMAGE. PLEASE | | | MAKE NECESSARY UPDATES TO RESOLVE THIS ISSUE. | | | | | | | | | DEPT. OF PUBLIC WORKS | | | MATT HEJAZI | | | [email protected] | | | 822-2045 |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
2 |
Status |
P |
Date |
10-20-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
10-20-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
10-20-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-10-20 08:29:48 | NO FURTHER COMMENTS FROM DEPARTMENT OF PUBLIC WORKS. | | | | | | MATT HEJAZI | | | [email protected] |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
F |
Date |
05-11-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
05-11-2020 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
05-11-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-05-11 12:39:24 | PLEASE PROVIDE THE FOLLOWINGS: | | | | | | 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID | | | WASTE VOLUME PRODUCED ALONG WITH THE SIZE AND TYPE OF | | | THE CONTAINER THAT WILL BE UTILIZED THAT WILL BE | | | UTILIZED FOR THE SANITATION SERVICE. | | | | | | 2- DUMPSTER ENCLOSURE DETAIL. FOR A FREESTANDING SITE | | | DUMPSTER ENCLOSURE, THE ENCLOSURE SHALL COMPLY WITH THE | | | LATEST REVISION OF CITY OF WEST PALM BEACH GENERAL | | | CONSTRUCTION-GARBAGE ENCLOSURE STANDARD, CG-7. | | | | | | 3- AUTO TURN FOR THE SANITATION SERVICE, FRONT LOADER | | | TRUCK WITH THE FOLLOWING SPECS: | | | - TRUCK LENGTH: 35 FT | | | - TRUCK WIDTH: 11 FT | | | - TURNING RADIUS: | | | - SAE TURNING RADIUS: 32.5 FT | | | - CURB-TO-CURB DIAMETER: 74 FT | | | - WALL-TO-WALL DIAMETER: 86.3 FT | | | | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
5 |
Status |
P |
Date |
10-04-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
10-04-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
10-04-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-10-04 13:59:14 | LLOUIE RECEIVES EMAIL FROM TRACY WARD, SENIOR | | | STORMWATER ENGINEER, ON 9/30/2022, STATING THAT THE | | | STORMWATER REVIEW HAS PASSED (SEE ATTACHED EMAIL | | | CORRESPONDANCE). |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
4 |
Status |
P |
Date |
03-24-2022 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
03-24-2022 |
Time |
17:50 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
03-24-2022 |
Time |
17:55 |
Sent To |
|
|
| Notes |
| 2022-03-24 17:55:33 | THE FOLLOWING COMMENT IS FROM THE REVIEW OF THE 3/1/22 | | | PLAN SUBMITTAL: | | | | | | 1. NOTE THE FIRE HYDRANT SHOWN ON SHEET C-8 TO BE 146 | | | FEET FROM THE NORTHWEST CORNER OF THE BUILDING IS A | | | PRIVATE FIRE HYDRANT. THERE IS A FIRE HYDRANT ALONG THE | | | SOUTH RIGHT OF WAY OF 45TH STREET ABOUT 250 FEET EAST | | | OF THE SITE'S DRIVEWAY. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | [email protected] | | | 561-494-1120 |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
3 |
Status |
F |
Date |
09-27-2021 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
09-27-2021 |
Time |
16:54 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
09-27-2021 |
Time |
16:54 |
Sent To |
|
|
| Notes |
| 2021-09-27 16:53:58 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 9-8-2021 SUBMITTAL PACKAGE. | | | | | | 1. WHAT IS THE VERTICAL CLEARANCE BETWEEN THE 15" STORM | | | OUTFALL PIPE AND 8" ROOF DRAIN PIPE AS THEY CROSS THE | | | 6" WASTEWATER LINE, 4" FIRE LINE AND 1" WATER LINE. | | | LABEL THESE VERTICAL CLEARANCES ON THE UTILITY PLAN AND | | | UTILITY CONNECTION PROFILE ON SHEET C-11. | | | | | | 2. NORTH ARROW POINTING TO THE WEST ON SHEET C-11. | | | | | | 3. SITE LIGHT FIXTURE IS LOCATED WITHIN THE 2-FOOT | | | OVERHANG OF THE PARKING STALLS ON THE WEST SIDE OF THE | | | SITE. | | | | | | 4. WHEEL STOPS MAY NOT BE NEEDED IF THERE IS TYPE 'D' | | | CURB AT THE END OF THE PARKING STALL AND THE PARKING | | | STALL INCLUDES 2 FEET OF OVERHANG OVER THE SIDEWALK OF | | | LANDSCAPE STRIP. IF WHEEL STOPS ARE USED MAKE SURE THE | | | PARKING SPACES ARE DEEP ENOUGH SO THAT THE STANDARD CAR | | | DOES NOT STICK OUT INTO THE DRIVE LANE. | | | | | | 5. CHECK COVER DEPTH OVER THE PROPOSED STORM PIPES IN | | | THE PARKING LOT. | | | | | | 6. CHECK THE THICKNESS OF THE CONCRETE ABOVE THE WEIR | | | OPENING IN THE CONTROL STRUCTURE. IS THE GRATE | | | SUPPORTED ON THIS SIDE? | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
F |
Date |
12-10-2020 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
12-10-2020 |
Time |
21:09 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
12-10-2020 |
Time |
21:13 |
Sent To |
|
|
| Notes |
| 2020-12-10 21:11:16 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 10-14-2020 SUBMITTAL PACKAGE. | | | | | | 1. CHECK CROSS SLOPE OF SIDEWALK WEST OF DRIVEWAY, IT | | | MAY EXCEED 2%. | | | | | | 2. SIDEWALK BETWEEN THE BACK OF WALK ALONG 45TH STREET | | | AND THE PARKING LOT ALONG THE WEST SIDE OF THE SITE | | | EXCEEDS 5% LONGITUDINAL SLOPE AND MAY REQUIRE | | | HANDRAILS. | | | | | | 3. SHOW CONCRETE HATCHING FOR THE SIDEWALK EAST OF THE | | | DRIVEWAY. | | | | | | 4. DRIVEWAY APRON BETWEEN SIDEWALK AND DROP CURB SHOULD | | | BE CONCRETE INSTEAD OF ASPHALT. | | | | | | 5. PROVIDE A CROSS SECTION FOR THE DRIVEWAY. | | | | | | 6. THE PARKING SPACE DETAIL STRIPING ON SHEET C-9 DOES | | | NOT MEET CITY'S DETAILS ILLUSTRATED IN THE CODE OF | | | ORDINANCES. . THE 4? VERTICAL STRIPES HAVE A 12" GAP | | | (INSTEAD OF 2") BETWEEN THEM (16" CENTER OF STRIPE TO | | | CENTER OF STRIPE) AND THE ENDS ARE CONNECTED WITH A 4" | | | HORIZONTAL STRIPE. THE 5' HANDICAP ACCESS AISLE SHOULD | | | HAVE VERTICAL STRIPES ON EACH SIDE. | | | | | | 7. SECTION A-A ON SHEET C-9 SHOWS THE TOE OF SLOPE OF | | | THE FILL SECTION MEETING EXISTING GRADE AT THE PROPERTY | | | LINE. A RETAINING WALL SIMILAR TO SECTIONS C-C AND D-D | | | MAY BE NEEDED. THERE SHOULD NOT BE DIRECT DISCHARGE | | | ONTO ADJACENT PROPERTIES. A CURB MAY BE NEEDED AT THE | | | EDGE OF SIDEWALK TO STOP THE RUNOFF FROM THE SIDEWALK | | | FROM FLOWING DOWN THESLIDE SLOPE. GRADING AT THE | | | PROPERTY LINE CANNOT BLOCK EXISTING RUNOFF FLOWING ONTO | | | THE PROPERTY FROM ADJACENT PROPERTIES. | | | | | | 8. LIST VERTICAL DATUM AND CONVERSION EQUATION TO | | | NGVD1929 ON SHEET C-10 AND ANY OTHER SHEET WITH | | | ELEVATION INFORMATION. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
05-07-2020 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
05-07-2020 |
Time |
12:19 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
05-07-2020 |
Time |
12:27 |
Sent To |
|
|
| Notes |
| 2020-05-07 12:27:11 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. PROVIDE THE VERTICAL DATUM CONVERSION EQUATION ON | | | THE SURVEY AND ENGINEERING PLANS. | | | | | | 2. PROVIDE REFERENCE TO VERTICAL DATUM AND CONVERSION | | | EQUATION TO NGVD1929 ON EVERY SHEET WITH ELEVATION | | | INFORMATION. | | | | | | 3. PBCHD ALLOWS LESSER MINIMUM SEPARATION DISTANCES | | | BETWEEN WATER AND SANITARY SEWER MAINS THAN WHAT IS | | | LISTED IN UTILITY CONNECTION NOTE #9 ON SHEET C-2. | | | | | | 4. ENVIRONMENTAL HEALTH NOTES (SHEET C-2) ERRATA: | | | A. SFWMD INSTEAD OF SWFWMD IN NOTE #1 | | | B. PALM BEACH COUNTY HEALTH DEPARTMENT INSTEAD OF WEST | | | PALM BEACH COUNTY HEALTH DEPARTMENT | | | | | | 5. HISTORICAL RESOURCE NOTE #2 (SHEET C-2) ERRATA: PALM | | | BEACH COUNTY INSTEAD OF BROWARD COUNTY | | | | | | 6. TRAFFIC CONTROL NOTES (SHEET C-2): REFERENCE FDOT | | | STANDARD PLANS INSTEAD OF STANDARD INDEXES. | | | | | | 7. SHOW 10' UTILITY EASEMENT AND FPL EASEMENT ALONG THE | | | NORTH PROPERTY LINE ON THE ENGINEERING PLANS AND | | | LANDSCAPE PLANS (SEE SURVEY). | | | | | | 8. VERIFY SCALE BAR ON THE ENGINEERING PLANS. | | | | | | 9. VERIFY PROPERTY LINE IS CALLED OUT IN THE CORRECT | | | LOCATION ON THE PROPOSED DRIVEWAY PROFILE ON SHEET C-9. | | | | | | 10. THE RUNOFF FROM THE SIDEWALK AND SIDESLOPE SHOWN | | | FOR SECTION A-A, THE SIDESLOPES ON SECTIONS C-C AND D-D | | | ON SHEET C-9 CANNOT DRAIN DIRECTLY ONTO THE ADJACENT | | | PROPERTY. CREATE A SWALE TO COLLECT THE RUNOFF. THE | | | SPREADER SWALE IN THE REAR OF THE PROPERTY CANNOT | | | OVERFLOW ONTO THE ADJACENT PROPERTY. CONSIDER DIRECTING | | | THE EXCESS RUNOFF TO 45TH STREET DRAINAGE SYSTEM. | | | | | | 11. THE BOTTOM ELEVATION OF 14.70 FT NAVD FOR THE | | | SPREADER SWALE IS LOWER THAN THE SEASONAL HIGHWATER | | | ELEVATION OF 14.87 FT NAVD SHOWN ON THE POND SECTION ON | | | SHEET C-10. | | | | | | 12. STORMWATER MANAGEMENT SYSTEM IS TO BE DESIGNED TO | | | MEET SFWMD ERP CRITERIA INCLUDING WATER QUALITY | | | TREATMENT OF THE LARGER OF 1" OF RUNOFF OR 2.5" TIMES | | | PERCENT OF IMPERVIOUSNESS AND PRE- VS. POST-DEVELOPMENT | | | PEAK DISCHARGE. DRAINAGE CALCULATIONS WILL BE REVIEWED | | | DURING ENGINEERING PERMIT SUBMITTAL. | | | | | | 13. 45TH STREET IS MAINTAINED BY PALM BEACH COUNTY. | | | COUNTY APPROVAL WILL BE REQUIRED FOR ANY WORK WITHIN | | | THE ROAD RIGHT-OF-WAY. | | | | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY | | | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. | | | | | | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED | | | WITH THE ENGINEERING PERMIT APPLICATION. | | | | | | 3. PROVIDE A COPY OF THE SFWMD ERP PRIOR TO STARTING | | | CONSTRUCTION. | | | | | | 4. SITE IS WITHIN THE JURISDICTIONAL LIMITS OF NPBCID | | | AND AN APPROVAL LETTER FROM NPBCID WILL BE NEEDED PRIOR | | | TO STARTING CONSTRUCTION. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
P |
Date |
10-23-2020 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
10-23-2020 |
Time |
10:10 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
05-13-2020 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
05-13-2020 |
Time |
09:22 |
Rev Time |
|
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-05-13 09:22:45 | 1. ADD CONVERSION TO NGVD-29 TO SURVEY AND ENGINEERING | | | PLANS. | | | 2. DRIVEWAY CONNECTION WILL REQUIRE PB COUNTY PERMIT. | | | 3. SITE PLAN APPROVAL WILL BE REQUIRED PRIOR TO | | | SUBMITTAL FOR ENGINEERING DEVELOPMENT REVIEW. | | | 4. ENG. PLANS CALL OUT 10 SPACES IN BOTH RETAIL AND | | | WAREHOUSE. ARE THESE THE REQUIRED NUMBER OF SPACES FOR | | | EACH USE? | | | 5. SURVEY NOTES REFER TO PB COUNTY BUILDING AND ZONING | | | RESTRICTIONS WHICH SHOULD BE CITY OF WPB. | | | 6. SURVEY ALSO STATES FOR REAL ESTATE TRANSACTION ONLY. | | | REMOVE NOTE. | | | 7. PROVIDE COPY OF TITLE COMMITMENT. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
5 |
Status |
P |
Date |
10-04-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
10-04-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
10-04-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-10-04 13:55:28 | LLOUIE SPOKE TO VALERIO ORICCHIO, CITY TRAFFIC | | | ENGINEER, ON 10/4. CONFIRMED DURING A PHONE | | | CONVERSATION THAT THE PREVIOUS CONDITION COMMENTS FROM | | | 11/13/2020 REVIEW (CYCLE 2) HAVE ALL BEEN ADDRESSED IN | | | THE 9/20/2022 RESUBMITTAL. NO CONDITIONS NECESSARY FROM | | | TRAFFIC (SEE ATTACHED EMAIL CORRESPONDANCE AS WELL). |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
4 |
Status |
P |
Date |
03-09-2022 |
|
|
Cont ID |
|
| Sent By |
|
Date |
03-09-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-03-09 16:38:23 | | | | NO FURTHER COMMENTS | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
3 |
Status |
P |
Date |
09-23-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
09-23-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-09-23 19:13:01 | NO FURTHER COMMENTS | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
2 |
Status |
P |
Date |
11-13-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
11-13-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-11-13 15:10:10 | PASSED WITH THE FOLLOWING CONDITIONS: | | | | | | 1. OBTAIN AND PROVIDE COUNTY TRAFFIC DIVISION WAIVE | | | APPROVAL PER TPS LETTER COMMENT #1 | | | | | | 2. SHOW DIAGONAL HATCHING PATTERN WITHIN THE DRIVEWA'S | | | ISLAND DIVIDER IN SITE PLAN C-5 | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
05-12-2020 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-05-12 14:55:26 | **** 2020-05-14: REMOVED 2 COMMENTS | | | | | | TRAFFIC STATEMENT COMMENTS: | | | 1. REVISE THE TRIP GENERATION ANALYSIS ACCORDING TO THE | | | LATEST VERSION OF THE ITE TRIP GENERATION MANUAL (I.E. | | | 10TH EDITION) AND USE THE CORRESPONDING LAND USE CODE | | | (I.E. 812 - BUILDING MATERIAL & LUMBER STORE). | | | 2. PER ITE GUIDELINES, RETAIL AND WAREHOUSE SQUARE | | | FOOTAGE MUST BE SUMMED FOR TRIP GENERATION PURPOSES, AS | | | THERE IS NO SEPARATION BETWEEN THE TWO BUILDINGS. | | | 3. PROVIDE COUNTY TPS LETTER. | | | | | | | | | SITE PLAN COMMENTS: | | | 4. SHOW FULL RIGHT-OF-WAY WIDTH AND RIGHT-OF-WAY WIDTH | | | FROM THE ROAD CENTERLINE TO THE PROPERTY LINE ON SITE | | | PLAN | | | 5. PROVIDE PHOTOMETRIC ANALYSIS | | | 6. IN THE SITE PLAN, INSERT A TABLE SHOWCASING REQUIRED | | | AND PROVIDED FOR THE FOLLOWING FEATURES: | | | A. NUMBER OF PARKING SPACES | | | B. LOADING ZONE AREA DIMENSION | | | C. NUMBER OF BICYCLE PARKING | | | 7. PROVIDE 2-FOOT OVERHANG ON VEHICULAR PARKING SPACES | | | WHEN FEASIBLE | | | 8. PROVIDE AUTOTURN ANALYSIS OF DELIVERY, GARBAGE, AND | | | SERVICE VEHICLES, FOR THE FOLLOWING: | | | A. DRIVEWAY ACCESS/EGRESS | | | B. INTERNAL CIRCULATION | | | C. MANEUVERS TO/FROM THE LOADING ZONE | | | 9. DRIVEWAY WIDTH SHOULD BE MINIMIZED. OTHERWISE, | | | DIAGONAL HATCHING SHOULD BE USED TO DELINEATE DRIVEWAY | | | LANES FOR PASSENGER CARS | | | 10. PROVIDE SIDEWALK DIMENSIONS (NOTE: MINIMUM 5 FEET) | | | 11. ONE-WAY CIRCULATION WITHIN THE FACILITY IS | | | STRONGLY RECOMMENDED | | | A. IN CASE, CONSIDER CONVERTING THE 90-DEGREE PARKING | | | SPOTS ON THE EAST SIDE OF THE PROPERTY TO ANGLED ONES | | | B. OTHERWISE, SOLVE THE MULTIPLE VEHICULAR CONFLICT | | | POINTS NEARBY THE DRIVEWAY AREA | | | | | | | | | VALERIO ORICCHIO | | | [email protected] | | | 561-494-1092 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
5 |
Status |
P |
Date |
10-04-2022 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
10-04-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
10-04-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-10-04 14:22:56 | THIS APPROVAL IS SUBJECT TO THE FOLLOWING CONDITIONS: | | | | | | 1.) THE CONSTRUCTION OF THE PROJECT SHALL COMPLY WITH | | | THE CONDITIONS SET FORTH IN THE FOLLOWING DOCUMENTS | | | ISSUED FOR THE PROJECT: A. PALM BEACH COUNTY LAND | | | DEVELOPMENT DIVISION RIGHT-OF-WAY CONSTRUCTION PERMIT | | | #RW56157-0722.; B. SOUTH FLORIDA WATER MANAGEMENT | | | DISTRICT INDIVIDUAL ENVIRONMENTAL RESOURCE PERMIT NO. | | | 50-103507-P | | | | | | 2.) CONDENSING UNITS PROPOSED ON THE ROOFTOP OF THE | | | BUILDING SHALL BE FULLY SCREENED FROM PUBLIC VIEW BY | | | THE BUILDING PARAPET AND/OR THE UTILIZATION OF AN | | | APPROPRIATE SCREENING MECHANISM APPROVED BY THE | | | DEVELOPMENT SERVICES DEPARTMENT ??? PLANNING DIVISION. | | | | | | 3.) SIGNAGE FOR THE PROJECT IS NOT A PART OF THIS | | | APPROVAL. ALL PROPOSED SIGNAGE (FREESTANDING AND WALL | | | SIGNAGE) SHALL COMPLY WITH SIGN REGULATIONS OF THE | | | CITY'S ZONING AND LAND DEVELOPMENT REGULATIONS (ZLDRS) | | | AND WILL BE REVIEWED AT TIME OF BUILDING PERMIT. | | | | | | 4.) ADDRESS THE FOLLOWING PRIOR TO THE SUBMISSION OF AN | | | ENGINEERING PERMIT: A. THE FIRE HYDRANT SHOWN ON SHEET | | | C-8 TO BE 146 FEET FROM THE NORTHWEST CORNER OF THE | | | BUILDING IS A PRIVATE FIRE HYDRANT. THERE IS A FIRE | | | HYDRANT ALONG THE SOUTH RIGHT-OF-WAY OF 45TH STREET | | | ABOUT 250 FEET EAST OF THE SITE'S DRIVEWAY. | | | | | | 5.) ALL PUBLIC UTILITIES SERVICES CONNECTIONS, | | | INCLUDING TELEPHONE, CABLE AND ELECTRIC DISTRIBUTION | | | SERVICE SHALL BE INSTALLED UNDERGROUND. | | | | | | 6.) PAVEMENT RESTORATION NOTE PROVIDED IN THE PLAN | | | WOULD APPLY TO WORK IN THE ROADWAY. FOR SIDEWALK | | | RESTORATION, PLEASE REFER TO CITY STANDARD DETAIL GC-1. | | | | | | 7.) PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT -- PLANNING DIVISION. | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
F |
Date |
03-03-2022 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
03-03-2022 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
03-03-2022 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-03-03 15:07:15 | GENERAL COMMENTS: | | | | | | 1.) THE COUNTY ROW PERMIT FOR THE PROPOSED | | | MODIFICATIONS TO THE CURB CUT ON 45TH STREET SHALL BE | | | REQUIRED PRIOR TO SITE PLAN APPROVAL. PER DISCUSS WITH | | | THE APPLICANT, THE APPLICANT IS WORKING WITH THE COUNTY | | | ON OBTAINING THE ROW PERMIT. PLEASE ENSURE ALL PLANS | | | SUBMITTED WITH THE COUNTY PERMIT APPLICATION MATCH THE | | | PLANS PROVIDED WITH THIS APPLICATION. | | | | | | 2.) PLEASE ENSURE ALL PLAN REVISIONS (IF APPLICABLE) | | | MATCH FOR CONSISTENCY. | | | | | | 3.) APPROVAL OF THE SITE PLAN SHALL BE REQUIRED BY THE | | | PUBLIC WORKS DEPARTMENT TO ENSURE ADEQUATE PROVISION | | | FOR TRASH PICK-UP AND THE MANEUVERING OF SANITATION | | | TRUCKS WITHIN THE SITE. | | | | | | | | | SITE PLAN COMMENTS: | | | | | | 1.) SHOW SETBACK DIMENSIONS OF ALL PROPOSED LIGHT | | | FIXTURES TO THE PROPERTY LINE(S). A MINIMUM 5 FT. | | | SETBACK SHALL BE PROVIDED. | | | | | | [9/23/2021 MODIFIED COMMENT: SETBACK DIMENSIONS ARE NOW | | | SHOWN; HOWEVER, THERE SEEMS TO BE A SLIGHT ENCROACHMENT | | | OF A LIGHT POLE WITHIN 5 FT. OF THE EAST PROPERTY LINE, | | | DESPITE THE SETBACK INDICATING A SETBACK OF 5 FT. FROM | | | THE PROPERTY LINE. PLEASE ADDRESS.] | | | | | | | | | 2.) THE ROW OF PARKING ALONG THE NORTH SIDE OF THE | | | BUILDING MAY NOT REQUIRE A WHEEL STOP, AS A NOTE IN THE | | | PLANS INDICATE A TYPE-D CURB. THIS WAS ALSO A COMMENT | | | PROVIDED BY THE ENGINEERING SERVICES DEPARTMENT FROM | | | THE LAST RESUBMITTAL. | | | | | | | | | SIGNAGE COMMENTS: | | | | | | 1.) PROPOSED FREESTANDING MONUMENT SIGN IS NOTED AS A | | | DIGITAL SIGN. DIGITAL SIGNS ARE NOT PERMITTED. | | | | | | [9/23/2021 REPEAT COMMENT: NOT ADDRESSED. SIGN DETAIL | | | PROVIDED ON SHEET AS002 INDICATES THAT THE MONUMENT | | | SIGN IS STILL A DIGITAL SIGN. DIGITAL SIGNS ARE NOT | | | PERMITTED IN THE CITY.] | | | | | | | | | CONDITIONS: | | | | | | * CONDENSING UNITS PROPOSED ON THE ROOFTOP OF THE | | | BUILDING SHALL BE FULLY SCREENED FROM PUBLIC VIEW BY | | | THE BUILDING PARAPET AND/OR ADDITIONAL EQUIPMENT | | | SCREENING. | | | | | | * ALL PUBLIC UTILITIES SERVICE CONNECTIONS, INCLUDING | | | TELEPHONE CABLE AND ELECTRIC DISTRIBUTION SERVICE, | | | SHALL BE INSTALLED UNDERGROUND. [ZLDR S.94-172(G)] | | | | | | * SIGNAGE IS NOT A PART OF THIS APPROVAL. ALL PROPOSED | | | SIGNAGE AND ASSOCIATED SIGN DETAIL(S) SHALL BE REVIEWED | | | AT TIME OF BUILDING PERMIT FOR CONSISTENCY WITH THE | | | SIGN REGULATIONS OF THE ZONING AND LAND DEVELOPMENT | | | REGULATIONS (ZLDRS). | | | | | | | | | INSTRUCTIONS FOR RESUBMITTAL: | | | | | | * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN | | | WRITTEN FORMAT. | | | | | | * WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF FOUR | | | (4) PAPER COPIES, ONE REDUCED COPY IN 11 INCHES X 17 | | | INCHES, AND AN ELECTRONIC COPY OF ALL DOCUMENTS AND | | | PLANS. | | | | | | * PLEASE NOTE THAT CHANGES ON THE RESUBMITTED PLANS MAY | | | RESULT IN ADDITIONAL COMMENTS. | | | | | | * YOU WILL BE PERMITTED ONE (1) RESUBMITTAL AT NO | | | ADDITIONAL COST. IF PREVIOUSLY-ISSUED COMMENTS CONTINUE | | | TO NOT BE SUFFICIENTLY ADDRESSED, THE APPLICANT WILL BE | | | ASSESSED A RESUBMITTAL FEE. SUCH FEE WILL BE 20% OF THE | | | ORIGINAL APPLICATION FEE ($200). | | | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE ANY | | | QUESTIONS. | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
09-23-2021 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
09-23-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
09-23-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-09-23 16:30:37 | GENERAL COMMENTS: | | | | | | 1.) IN ACCORDANCE WITH ZLDR S.94-175, THE APPLICANT | | | SHALL SUBMIT A NEIGHBORHOOD COMPATIBILITY ANALYSIS OF | | | THE PROPOSED FACILITIES AND OPERATIONS. SITE PLAN | | | APPROVAL SHALL NOT BE GRANTED UNLESS THERE IS | | | COMPLIANCE WITH ALL THE REQUIREMENTS FOUND IN ZONING | | | AND LAND DEVELOPMENT REGULATIONS (ZLDR) S.94-175(B)(2). | | | [11/13/2020 REPEAT COMMENT: A WRITTEN RESPONSE TO EACH | | | OF THE IMPACT STANDARDS IN SEC. 94-175 OF THE ZONING | | | AND LAND DEVELOPMENT REGULATIONS (ZLDRS) SHALL BE | | | PROVIDED; A GENERAL STATEMENT IS INSUFFICIENT.] | | | | | | 2.) A COUNTY ROW PRE-DETERMINATION APPROVAL LETTER FOR | | | THE PROPOSED MODIFICATIONS TO THE CURB CUT ON 45TH | | | STREET IS REQUIRED PRIOR TO GRANTING SITE PLAN | | | APPROVAL. [11/13/2020 REPEAT COMMENT: AS NOTED IN THE | | | RESPONSE LETTER TO STAFF (DATED 8/26/21 AND RECEIVED | | | 8/31/21), THE APPLICANT IS STILL ADDRESSING COMMENTS | | | FROM PALM BEACH COUNTY. ONCE THE PRE-DETERMINATION | | | LETTER IS RECEIVED, THE APPLICANT WILL FORWARD TO | | | STAFF.] | | | | | | 3.) PLEASE REMEMBER TO UPDATE THE SHEETS WITH THE NEW | | | REVISION DATE FOR TRACKING PURPOSES. | | | | | | 4.) ALL PLANS SHALL MATCH FOR CONSISTENCY. | | | | | | 5.) THE TPS LETTER FROM THE COUNTY IS SET TO EXPIRE IN | | | DECEMBER. IT IS ADVISED THAT THE APPLICANT COORDINATE | | | WITH THE COUNTY TO EXTEND THE TPS LETTER. | | | | | | | | | SITE PLAN COMMENTS: | | | | | | 1.) PLEASE ADDRESS/CORRECT THE FOLLOWING IN THE COVER | | | SHEET, CONTAINING THE SITE DATA: A) THE CORRECT PARCEL | | | CONTROL NUMBER (PCN). B) THE EXISTING ZONING OF THE | | | PROPERTY C) THE PROPOSED ZONING OF THE PROPERTY. | | | [11/13/2020 REPEAT COMMENT: NOT ADDRESSED. NO | | | CORRECTIONS HAVE BEEN MADE TO THE SITE DATA | | | INFORMATION.] | | | | | | 2.) CONSIDER ADDING A GATE ON THE WEST SIDE OF THE | | | BUILDING FOR PUBLIC SAFETY. THE AREA IS ACCESSIBLE AND | | | SEEMS TO BE HIDDEN FROM VIEW (SIDEWALK ALONG THE WEST | | | SIDE OF THE BUILDING). | | | | | | 3.) THE PROPOSED LIGHT POLES ON THE WEST SIDE OF THE | | | PROPERTY SEEM TO BE IN CONFLICT WITH THE 2 FT. CURB | | | OVERHANG. PLEASE RELOCATE/ELIMINATE LIGHT FIXTURES TO | | | PREVENT CONFLICT. | | | | | | 4.) SHOW SETBACK DIMENSIONS OF ALL PROPOSED LIGHT | | | FIXTURES TO THE PROPERTY LINE(S). A MINIMUM 5 FT. | | | SETBACK SHALL BE PROVIDED. | | | | | | 5.) PLEASE CHECK WITH MATT HEJAZI, INDUSTRIAL ENGINEER, | | | PUBLIC WORKS DEPARTMENT - SANITATION DIVISION @ (561) | | | 822-2045, TO DETERMINE TRASH PICK-UP FOR THE PROPERTY | | | AND IF A DUMPSTER ENCLOSURE IS REQUIRED. STAFF WILL | | | NEED WRITTEN DOCUMENTATION FROM THE SANITATION DIVISION | | | STAFF THAT THE PROPOSAL FOR HANDLING REFUSE IS | | | ACCEPTABLE. | | | | | | 6.) PROPOSED PARKING COUNT DOES NOT ADD UP TO THE 20 | | | PARKING SPACES PROVIDED IN THE SITE PLAN. PLEASE | | | ADDRESS. | | | | | | 7.) MINIMUM OFF-STREET LOADING SHOULD REFERENCE THAT | | | ONE 10 FT. BY 25 FT. LOADING ZONE IS REQUIRED FOR THE | | | PROJECT. | | | | | | 8.) SHOW SETBACK DISTANCE OF THE PROPOSED WATER | | | EQUIPMENT. SCREENING OF THE EQUIPMENT IS RECOMMENDED | | | ALONG 45TH STREET. | | | | | | | | | | | | ARCHITECTURAL COMMENTS: | | | | | | 1.) NO UPDATED ARCHITECTURAL PLANS HAVE BEEN PROVIDED | | | TO ADDRESS THE COMMENTS FROM THE 11/30/2020 ZONING | | | STAFF REVIEW. | | | | | | | | | | | | SITE PHOTOMETRICS/LIGHTING COMMENTS: | | | | | | 1.) THE PHOTOMETRIC PLAN MUST BE UPDATED TO REFLECT THE | | | LATEST CHANGES MADE TO THE SITE PLAN. ALSO, SEE SITE | | | PLAN COMMENTS FOR ADDITIONAL COMMENTS ON LIGHTING THAT | | | MUST BE ADDRESSED. | | | | | | 2.) THE FOLLOWING NOTE SHALL BE PROVIDED IN THE | | | PHOTOMETRIC PLAN: ALL OUTDOOR LIGHTING SHALL BE | | | SHIELDED TO REDUCE GLARE AND SHALL BE ARRANGED TO | | | REFLECT LIGHT OR GLARE AWAY FROM PUBLIC THROUGHFARES, | | | IN ACCORDANCE WITH SEC. 94-309(A) OF THE ZLDRS. | | | [5/11/2020 AND 11/30/2020 REPEAT COMMENT: NO REVISED | | | PHOTOMETRIC PLAN ADDRESSING COMMENTS ABOVE PROVIDED IN | | | THE 8/31/2021 RESUBMITTAL PACKET.] | | | | | | | | | | | | SIGNAGE COMMENTS: | | | | | | 1.) PROPOSED FREESTANDING MONUMENT SIGN IS NOTED AS A | | | DIGITAL SIGN. DIGITAL SIGNS ARE NOT PERMITTED. | | | | | | | | | | | | CONDITIONS: | | | | | | * CONDENSING UNITS PROPOSED ON THE ROOFTOP OF THE | | | BUILDING SHALL BE FULLY SCREENED FROM PUBLIC VIEW BY | | | THE BUILDING PARAPET. | | | | | | * ALL PUBLIC UTILITIES SERVICE CONNECTIONS, INCLUDING | | | TELEPHONE CABLE AND ELECTRIC DISTRIBUTION SERVICE, | | | SHALL BE INSTALLED UNDERGROUND. [ZLDR S.94-172(G)] | | | | | | | | | | | | INSTRUCTIONS FOR RESUBMITTAL: | | | | | | * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN | | | WRITTEN FORMAT. | | | | | | * WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF 5 | | | PAPER COPIES, ONE REDUCED COPY IN 11 INCHES X 17 | | | INCHES, AND AN ELECTRONIC COPY OF ALL DOCUMENTS AND | | | PLANS. | | | | | | * PLEASE NOTE THAT CHANGES ON THE RESUBMITTED PLANS MAY | | | RESULT IN ADDITIONAL COMMENTS. | | | | | | * PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($200). | | | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE ANY | | | QUESTIONS. | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
11-13-2020 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
11-13-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
11-13-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-11-13 11:46:06 | GENERAL COMMENTS: | | | | | | 1.) IN ACCORDANCE WITH ZLDR S.94-175, THE APPLICANT | | | SHALL SUBMIT A NEIGHBORHOOD COMPATIBILITY ANALYSIS OF | | | PROPOSED FACILITIES AND OPERATIONS. SITE PLAN APPROVAL | | | SHALL NOT BE GRANTED UNLESS THERE IS COMPLIANCE WITH | | | ALL OF THE REQUIREMENTS FOUND IN ZLDR S.94-175(B)(2). | | | | | | [PLEASE NOTE THAT THIS COMMENT WAS MISSED BY STAFF | | | DURING THE INITIAL REVIEW. THE STANDARDS ARE STRAIGHT | | | FORWARD AND SHOULD NOT BE AN ISSUE FOR THE PROPOSED | | | USE.] | | | | | | 2.) AS DISCUSSED WITH THE AGENT (HUNTER JOHNSON OF ACT) | | | ON 11/10/2020, THE APPLICANT IS SEEKING A ROW APPROVAL | | | LETTER FROM PALM BEACH COUNTY FOR THE INGRESS/EGRESS | | | POINT ON 45TH STREET. THE ROW APPROVAL LETTER FROM PALM | | | BEACH COUNTY IS REQUIRED AS IT IS CLEARLY STATED IN THE | | | 5/18/2020 TPS LETTER THAT THE ACCESS POINT DOES NOT | | | MEET COUNTY ACCESS MANAGEMENT STANDARDS. STAFF IS | | | REQUESTING THE COUNTY ROW APPROVAL LETTER BE SUBMITTED | | | TO STAFF PRIOR TO SITE PLAN APPROVAL TO ENSURE THERE | | | WILL BE NO/MINIMAL SITE PLAN CHANGES AFTER APPROVAL IS | | | GRANTED. | | | | | | 3.) AS NOTED IN SITE PLAN COMMENTS #5 FROM ZONING | | | REVIEW #1 (5/11/2020), THE INGRESS/EGRESS POINT CANNOT | | | EXCEED 24 FT. IN WIDTH, UNLESS APPROVED BY THE | | | ENGINEERING SERVICES DEPARTMENT. STAFF WILL NEED | | | WRITTEN DOCUMENTATION FROM THE ENGINEERING SERVICES | | | DEPARTMENT APPROVING THE DESIGN AND WIDTH OF THE ACCESS | | | POINT. | | | | | | | | | SITE PLAN COMMENTS: | | | | | | 1.) PLEASE ADDRESS THE FOLLOWING IN THE COVER SHEET, | | | CONTAINING THE SITE DATA TABULAR: A) THE CORRECT PARCEL | | | CONTROL NUMBER IS 74-42-43-01-22-001-0000. B) THE | | | EXISTING ZONING OF THE PROPERTY IS INDUSTRIAL (I) (NOT | | | OFFICE REGIONAL DISTRICT). C) THE PROPOSED ZONING OF | | | THE PROPERTY IS INDUSTRIAL (I) (NOT COMMERCIAL GENERAL | | | DISTRICT). | | | | | | 2.) SHOW LOCATION OF ALL PROPOSED MECHANICAL EQUIPMENT. | | | MECHANICAL EQUIPMENT MAY NOT PROJECT MORE THAN 4 FT. | | | INTO A REQUIRED SETBACK; ROOFTOP EQUIPMENT SHALL BE | | | SCREENED FROM PUBLIC VIEW BY A PARAPET. [5/11/2020 | | | REPEAT COMMENT: THIS COMMENT WAS NOT ADDRESSED IN THE | | | 10/19/2020 RESUBMITTED PLANS. NO RESPONSE PROVIDED BY | | | THE APPLICANT ON THIS COMMENT IN THE RESPONSE LETTER.] | | | | | | 3.) PARKING STALL PAINTING DETAIL IS REQUIRED IN THE | | | PLAN. THE STALL PAINTING DETAIL SHALL BE CONSISTENT | | | WITH THE REQUIREMENTS IN ZLDR S.94-485, FIGURE XV-2. | | | [5/11/2020 REPEAT COMMENT: THIS COMMENT WAS NOT | | | ADDRESSED. ALTHOUGH PARKING STALL DIMENSIONS ARE | | | REQUIRED IN THE SITE PLAN, IT IS ALSO REQUIRED THAT A | | | STALL PAINTING DETAIL, CONSISTENT WITH THE PAVEMENT | | | STRIPING STANDARDS OF THE CITY ARE PROVIDED IN THE | | | PLANS TO DEMONSTRATE CONSISTENCY WITH THE ZLDRS.] | | | | | | 4.) PURSUANT TO 94-485(N)(1) OF THE ZLDRS, IF THE TOTAL | | | PARKING REQUIREMENT OF ANY USE OR STRUCTURE IS LESS | | | THAN 20 SPACES, NO SMALL CAR/COMPACT PARKING SPACES ARE | | | PERMITTED. THE SITE PLAN SHOWS THAT THERE ARE 5 COMPACT | | | PARKING STALLS FOR THE PROJECT. PER THE LATEST PARKING | | | CALCULATIONS, A TOTAL OF 18 PARKING SPACES IS REQUIRED | | | (NOT 19 PARKING SPACES AS NOTED IN THE SITE DATA | | | TABULAR), WHICH DOES NOT MEET THE MINIMUM REQUIREMENT | | | FOR COMPACT SPACES. PLEASE ADDRESS. | | | | | | 5.) THE BICYCLE RACK SHALL BE LOCATED AS NEAR THE | | | PRINCIPAL ENTRANCE AS PRACTICABLE. THE PROPOSED | | | LOCATION IN THE SITE PLAN DOES NOT MEET THIS STANDARD. | | | [ZLDR S.94-485(Q)(2)10.] [5/11/2020 REPEAT COMMENT: | | | STAFF BELIEVES THAT THE LOCATION FOR THE PROPOSED | | | BICYCLE RACK COULD BE IMPROVED. PLEASE CONSULT WITH | | | STAFF FOR IDEAL PLACEMENT.] | | | | | | | | | ARCHITECTURAL COMMENTS: | | | | | | 1.) PER THE APPLICANT'S RESPONSE TO 5/11/2020 | | | ARCHITECTURAL COMMENT #1, A RENDERED VIEW OF THE | | | PROJECT FROM 45TH STREET CAN BE PROVIDED UPON REQUEST. | | | STAFF IS REQUESTING THE RENDERING TO DETERMINE IF THE | | | 5/11/2020 ARCHITECTURAL COMMENT #1 HAS BEEN SATISFIED. | | | | | | 2.) GENERAL AREA FOR WALL SIGNAGE DETECTED IN THE | | | BUILDING ELEVATIONS FOR THE PROPOSED PROJECT. PLEASE | | | PROVIDE THE FOLLOWING NOTE IN THE ARCHITECTURAL | | | BUILDING ELEVATIONS PAGE: ALL WALL SIGNAGE SHALL COMPLY | | | WITH ARTICLE XIII, SIGN REGULATIONS, OF THE CITY'S | | | ZONING AND LAND DEVELOPMENT REGULATIONS. | | | | | | | | | SITE PHOTOMETRICS/LIGHTING: | | | | | | 1.) THE FOLLOWING NOTE SHALL BE PROVIDED IN THE | | | PHOTOMETRIC PLAN: ALL OUTDOOR LIGHTING SHALL BE | | | SHIELDED TO REDUCE GLARE AND SHALL BE ARRANGED TO | | | REFLECT LIGHT OR GLARE AWAY FROM PUBLIC THOROUGHFARES, | | | IN ACCORDANCE WITH SEC. 94-309(A) OF THE ZONING AND | | | LAND DEVELOPMENT REGULATIONS. [5/11/2020 REPEAT | | | COMMENT: NOTE IS STILL MISSING FROM THE PHOTOMETRIC | | | PLAN. PLEASE ADDRESS.] | | | | | | | | | SIGNAGE COMMENTS: | | | | | | 1.) THE PROPOSED FREESTANDING SIGN CANNOT BE PLACED | | | WITHIN THE 10 FT. WIDE UTILITY EASEMENT ALONG THE FRONT | | | PROPERTY LINE, UNLESS EASEMENT RELEASE(S) ARE PROVIDED | | | FROM THE HOLDER(S) OF THE EASEMENT. | | | | | | 2.) DETAILS ON THE HEIGHT AND THE SIGN AREA OF THE | | | PROPOSED FREESTANDING SIGN SHALL BE PROVIDED AT THIS | | | TIME. PLEASE NOTE THAT HEIGHT AND SIGN AREA | | | REQUIREMENTS IN THE INDUSTRIAL (I) ZONING DISTRICT ARE | | | PROVIDED IN S.94-408(E) OF THE ZLDRS. | | | | | | 3.) NO SETBACK DISTANCES HAVE BEEN PROVIDED FROM | | | PROPOSED FREESTANDING SIGN TO THE PROPERTY LINES. | | | PLEASE PROVIDE. ALL SETBACK DISTANCES SHALL BE | | | CONSISTENT WITH THE REQUIREMENTS IN S.94-408(E) OF THE | | | ZLDRS. | | | | | | | | | | | | INSTRUCTIONS FOR RESUBMITTAL: | | | | | | * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN | | | WRITTEN FORMAT. | | | | | | * WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF 5 | | | PAPER COPIES, ONE REDUCED COPY IN 11 INCHES X 17 | | | INCHES, AND AN ELECTRONIC COPY OF ALL PLANS. | | | | | | * PLEASE NOTE THAT CHANGES ON THE RESUBMITTED PLANS MAY | | | RESULT IN ADDITIONAL COMMENTS. | | | | | | * PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($200). | | | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE ANY | | | QUESTIONS. | | | | | | | | | CONDITIONS: | | | | | | 1.) ALL PUBLIC UTILITIES SERVICE CONNECTIONS, INCLUDING | | | TELEPHONE CABLE AND ELECTRIC DISTRIBUTION SERVICE, | | | SHALL BE INSTALLED UNDERGROUND. [ZLDR S.94-172(G)] |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
05-11-2020 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
05-11-2020 |
Time |
|
Rev Time |
|
| Received By |
llouie |
Date |
05-11-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-05-11 13:33:49 | GENERAL COMMENTS: | | | | | | 1.) PROVIDE A LETTER FROM THE PALM BEACH COUNTY | | | DEPARTMENT OF ENGINEERING AND PUBLIC WORKS - TRAFFIC | | | DIVISION, STATING THAT THE PROPOSED PROJECT MEETS THE | | | TRAFFIC PERFORMANCE STANDARDS (TPS) OF THE COUNTY. | | | | | | 2.) PROVIDE WRITTEN CONFIRMATION THAT THE PUBLIC | | | UTILITIES DEPARTMENT HAS REVIEWED THE PROPOSAL FOR | | | WATER, SEWAGE TREATMENT, STORM DRAINAGE AND GARBAGE | | | COLLECTION SERVICES. | | | | | | 3.) LETTERS FROM AT&T AND COMCAST, CONFIRMING THAT THE | | | PROPOSED PROJECT DOES NOT ENCROACH INTO THEIR EASEMENTS | | | OR OTHERWISE INTERFERE WITH THE PROVISION OF THEIR | | | SERVICES IS REQUIRED. | | | | | | 4.) STAFF DOES NOT AGREE THAT ALL THE SITE DESIGN | | | QUALITATIVE DEVELOPMENT STANDARDS HAVE BEEN MET, | | | PURSUANT TO SEC. 94-35(C) OF THE ZONING AND LAND | | | DEVELOPMENT REGULATIONS (ZLDRS); SPECIFICALLY, SEC. | | | 94-35(C)(3), SCREENING AND BUFFERING, AS STAFF BELIEVES | | | THAT CERTAIN SITE ELEMENTS, SUCH AS THE LOCATION OF THE | | | PROPOSED LOADING ZONE AND REFUSE AND RECYCLING STAGING | | | AREA IS MORE APPROPRIATE AT THE REAR OF THE BUILDING TO | | | PROVIDE FOR BETTER SCREENING (AS RECOMMENDED BY STAFF | | | IN THE PRE-APPLICATION MEETING). THE CURRENT SITE | | | DESIGN DOES NOT PROVIDE ANY SCREENING FOR THE LOADING | | | AND STAGING AREA. ADDITIONALLY, PURSUANT TO ZLDR | | | S.94-315, THE OUTDOOR STAGING AREA IS NOT PERMITTED | | | UNLESS APPROPRIATE SCREENING IS PROVIDED. | | | | | | 5.) THE INGRESS/EGRESS POINT HAS BEEN MODIFIED IN THE | | | PLAN. AS A RESULT, A PREDETERMINATION LETTER FROM PALM | | | BEACH COUNTY IS REQUIRED PRIOR TO FINAL SITE PLAN | | | APPROVAL. | | | | | | 6.) ALL PUBLIC UTILITIES SERVICE CONNECTIONS, INCLUDING | | | TELEPHONE CABLE AND ELECTRIC DISTRIBUTION SERVICE, | | | SHALL BE INSTALLED UNDERGROUND ON ALL SITES LARGER THAN | | | 30,000 SQ. FT. [ZLDR S.94-172(G)] | | | | | | 7.) IT SHOULD BE NOTED THAT THE PARCEL IMMEDIATELY | | | SOUTH OF THE SUBJECT PROPERTY IS A LAND LOCKED PARCEL. | | | THE PARCELS IN THE IMMEDIATE VICINITY WAS NOT | | | SUBDIVIDED IN THIS MANNER (REFERENCE: RESOLUTION NO. | | | 239-18/PB 1771). A RESOLUTION FOR THE LAND LOCKED | | | PARCEL MUST BE RESOLVED. | | | | | | | | | SITE DESIGN COMMENTS: | | | | | | 1.) AS DISCUSSED IN THE PREAPPLICATION MEETING, IT WAS | | | RECOMMENDED THAT THE BUILDING FOOTPRINT BE PLACED | | | CLOSED TO 45TH STREET TO PROVIDE FOR A STRONGER STREET | | | PRESENCE. IT IS STILL HIGHLY RECOMMENDED THAT THE SITE | | | BE REDESIGNED TO ACCOMMODATE THIS. | | | | | | 2.) IT IS NOT CLEAR WHY AN EXFILTRATION TRENCH WAS NOT | | | CONSIDERED IN THE CURRENT SITE DESIGN. AN EXFILTRATION | | | TRENCH WOULD ALLOW THE BUILDING TO BE PLACED CLOSER TO | | | THE STREET AND PROVIDE FOR IMPROVED INTERNAL SITE | | | CIRCULATION AND SCREENING OF PARKING AND LOADING. | | | | | | | | | SITE PLAN COMMENTS: | | | | | | 1.) NOT ALL REQUIRED INFORMATION IN THE SITE PLAN | | | CHECKLIST (SEE PAGE 15 OF THE 2020 DEVELOPMENT | | | APPLICATION) HAS BEEN PROVIDED IN THE PLAN. SOME OF THE | | | MISSING DETAILS INCLUDE: THE DATA TABLE, STANDARD CITY | | | DETAILS OF PARKING, ETC. | | | | | | 2.) NOTED SCALE IN THE SITE PLAN IS NOT THE CORRECT | | | SCALE (MEASUREMENTS DO NOT ADD UP). PLEASE CORRECT. | | | | | | 3.) ALL BUILDING SETBACKS SHALL BE ILLUSTRATED IN THE | | | SITE PLAN. PLEASE ADDRESS FOR COMPLIANCE WITH THE | | | ZLDRS. | | | | | | 4.) SHOW LOCATION OF ALL PROPOSED MECHANICAL EQUIPMENT. | | | MECHANICAL EQUIPMENT MAY NOT PROJECT MORE THAN 4 FT. | | | INTO A REQUIRED SETBACK; ROOFTOP EQUIPMENT SHALL BE | | | SCREENED FROM PUBLIC VIEW BY A PARAPET. [ZLDR | | | S.94-305(B)(4)] | | | | | | 5.) THE EXISTING DRIVEWAY HAS BEEN MODIFIED. PLEASE | | | NOTE THAT ANY MODIFIED DRIVEWAY SHALL MEET THE MINIMUM | | | STANDARDS OF THE ZLDRS, AND THEREFORE, THE | | | INGRESS/EGRESS POINT SHALL NOT EXCEED 24 FT. IN WIDTH. | | | | | | 6.) WHEEL STOPS SHALL NOT BE PROVIDED IN THE PROJECT IF | | | THERE IS A 2 FT. CURB OVERHANG FOR VEHICLES. | | | ADDITIONALLY, PARKING STALL DEPTH CAN BE REDUCED TO 16 | | | FT. WHEREVER THERE IS A 2 FT. CURB OVERHANG. | | | | | | 7.) PARKING STALL PAINTING DETAIL IS REQUIRED IN THE | | | PLAN. THE STALL PAINTING DETAIL SHALL BE CONSISTENT | | | WITH THE REQUIREMENTS IN ZLDR S.94-485, FIGURE XV-2. | | | | | | 8.) COMPACT PARKING STALLS SHALL NOT BE CONCENTRATED IN | | | ONE AREA OF THE PARKING LOT AND SHALL BE DISPERSED | | | EQUALLY THROUGHOUT THE PARKING LOT. [ZLDR | | | S.94-485(N)(1)] | | | | | | 9.) THE BICYCLE RACK SHALL BE LOCATED AS NEAR THE | | | PRINCIPAL ENTRANCE AS PRACTICABLE. THE PROPOSED | | | LOCATION IN THE SITE PLAN DOES NOT MEET THIS STANDARD. | | | [ZLDR S.94-485(Q)(2)10.] | | | | | | 10.) PROVIDE A DETAIL OF THE BICYCLE RACK. THE RACK | | | DETAIL SHALL BE CONSISTENT WITH THE DESIGN STANDARDS OF | | | THE CITY'S BICYCLE PARKING GUIDELINES. PLEASE NOTE THAT | | | STAFF CAN PROVIDE A COPY OF THE BICYCLE PARKING | | | GUIDELINES UPON REQUEST. | | | | | | | | | ARCHITECTURAL COMMENTS: | | | | | | 1.) IT IS HIGHLY ENCOURAGED THAT THE BUILDING FACADES | | | ARE IMPROVED WITH ADDITIONAL ARCHITECTURAL | | | FEATURES/FENESTRATION. | | | | | | | | | SITE PHOTOMETRICS/LIGHTING: | | | | | | 1.) A PHOTOMETRIC PLAN IS MISSING FROM THE APPLICATION | | | SUBMITTAL. PLEASE PROVIDE FOR STAFF REVIEW. | | | | | | 2.) THE FOLLOWING NOTE SHALL BE PROVIDED IN THE | | | PHOTOMETRIC PLAN: ALL OUTDOOR LIGHTING SHALL BE | | | SHIELDED TO REDUCE GLARE AND SHALL BE ARRANGED TO | | | REFLECT FLIGHT OR GLARE AWAY FROM PUBLIC THOROUGHFARES, | | | IN ACCORDANCE WITH SEC. 94-309(A) OF THE ZONING AND | | | LAND DEVELOPMENT REGULATIONS. | | | | | | | | | SIGNAGE: | | | | | | 1.) PROVIDE INFORMATION ON PROJECT SIGNAGE. PLEASE NOTE | | | THAT SETBACK DIMENSIONS, CONSISTENT WITH ARTICLE XIII, | | | SIGN REGULATIONS, SHALL BE PROVIDED IN THE PLANS IF | | | FREESTANDING SIGNAGE IS PROPOSED FOR THE SITE. | | | | | | | | | INSTRUCTIONS FOR RESUBMITTAL: | | | | | | * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN | | | WRITTEN FORMAT. | | | | | | * WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF SIX | | | (6) PAPER COPIES, ONE (1) REDUCED COPY IN 8.5 INCHES X | | | 11 INCHES AND ONE (1) SET IN 11 INCHES X 17 INCHES, AND | | | AN ELECTRONIC COPY OF ALL PLANS. | | | | | | * PLEASE NOTE THAT CHANGES ON THE RESUBMITTED PLANS MAY | | | RESULT IN ADDITIONAL COMMENTS. | | | | | | * PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20 PERCENT OF THE ORIGINAL APPLICATION FEE. | | | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE ANY | | | QUESTIONS. | | | |
|
|
| |