Plan Review Details - Project Z20030026
| Plan Review Stops For Project Z20030026 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
08-05-2020 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
08-05-2020 |
Time |
14:09 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
08-05-2020 |
Time |
14:09 |
Sent To |
|
|
| Notes |
| 2020-08-05 14:12:45 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. DEMOLITION OF THE EXISTING BUILDING. AN ASBESTOS | | | SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT | | | REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH | | | COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963, | | | OR BY EMAIL: [email protected] | | | | | | 3. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 4. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, GAS SYSTEMS, GENERATORS, FIRE ALARM SYSTEMS, | | | FIRE SPRINKLER AND OTHER FIRE SUPPRESSION SYSTEMS, | | | GREASE INTERCEPTORS, SITE LIGHTING, SITE LANDSCAPE, | | | SITE IRRIGATION, ETC. | | | | | | 5. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND | | | CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF | | | CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL | | | NEIGHBORING PROPERTIES. | | | | | | 6. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER | | | AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY, | | | INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE | | | CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF | | | NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION | | | THAT MAY AFFECT THE USE OF THEIR PROPERTY. | | | | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
04-08-2020 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
04-08-2020 |
Time |
19:57 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
04-08-2020 |
Time |
19:57 |
Sent To |
|
|
| Notes |
| 2020-04-08 20:03:33 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. DEMOLITION OF THE EXISTING BUILDING. AN ASBESTOS | | | SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT | | | REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH | | | COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963, | | | OR BY EMAIL: [email protected] | | | | | | 3. NUMBER OF ACCESSIBLE PARKING SPACES. THE PARKING | | | DATA ON SITE PLAN SHEET C-03 SHOWS THAT 33 PARKING | | | SPACES WILL BE PROVIDED BUT ONLY 1 ACCESSIBLE PARKING | | | SPACE IS SHOWN. SECTION 208.2 OF FLORIDA ACCESSIBILITY | | | CODE 2 ACCESSIBLE PARKING SPACES ARE REQUIRED. THE | | | MINIMUM NUMBER OF ACCESSIBLE PARKING SPACES PROVIDED | | | SHALL BE IN ACCORDANCE WITH SECTION 208.2 OF FLORIDA | | | ACCESSIBILITY CODE. | | | | | | 4. LOCATION OF ACCESSIBLE PARKING SPACES. WHEN THE | | | ADDITIONAL ACCESSIBLE PARKING SPACE IS PROVIDED IT | | | SHALL BE LOCATED ON THE SHORTEST POSSIBLE ROUTE OF | | | TRAVEL FROM ADJACENT PARKING TO AN ACCESSIBLE ENTRANCE | | | PER SECTION 208.3 OF FLORIDA ACCESSIBILITY CODE. THE | | | DESIGN OF ACCESSIBLE PARKING SPACES SHALL COMPLY WITH | | | SECTION 502 OF FLORIDA ACCESSIBILITY CODE | | | | | | 5. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 6. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, GAS SYSTEMS, GENERATORS, FIRE ALARM SYSTEMS, | | | FIRE SPRINKLER AND OTHER FIRE SUPPRESSION SYSTEMS, | | | GREASE INTERCEPTORS, SITE LIGHTING, SITE LANDSCAPE, | | | SITE IRRIGATION, ETC. | | | | | | 7. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND | | | CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF | | | CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL | | | NEIGHBORING PROPERTIES. | | | | | | 8. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER | | | AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY, | | | INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE | | | CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF | | | NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION | | | THAT MAY AFFECT THE USE OF THEIR PROPERTY. | | | | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
4 |
Status |
P |
Date |
10-28-2020 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
10-28-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
10-28-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-10-28 07:06:02 | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD | | | CUSTOMER SERVICE SUPERVISOR | | | CITY OF WEST PALM BEACH PUBLIC UTILITIES, 561-822-2262 | | | [email protected] | | | | | | -FOR FORMAL ENGINEERING SUBMITTAL, PLEASE ADD THE | | | FOLLOWING TO UTILITY PLAN: LABEL FOR THE FIRE HYDRANT, | | | PIPE MATERIAL TYPE TO 8? WATER MAIN LABEL, AND LABEL | | | FOR THE NEW WATER SERVICE LINE SHOWING PIPE SIZE AND | | | MATERIAL TYPE. | | | | | | COMMENTS FROM RICK ROSSANO: | | | PLEASE LABEL CITY POINT OF SERVICE. | | | PLEASE LABEL PROPOSED WATER PIPE MATERIAL IN PARKER | | | AVE. RIGHT OF WAY COMING OFF OF PROPOSED 8 IN. X 2 IN. | | | TAP. | | | CONFIRM ALL FRANCHISE UTILITIES ARE SHOWN. | | | ON DEMO PLAN SHEET, PLEASE ADD NOTE TP PROTECT ALL | | | CATCH BASINS AROUND PERIMETER OF PROJECT INCLUDING ANY | | | ON BELVEDERE RD. OR PARKER AVE. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | | | | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES | | | DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR, WEST PALM BEACH, FL | | | 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | DIRECT: (561) 494-1098 | | | MOBILE: (561) 246-9525 | | | FAX: (561) 494-1116 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
3 |
Status |
F |
Date |
09-23-2020 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
09-23-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
09-23-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-09-23 16:45:12 | | | | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD | | | CUSTOMER SERVICE SUPERVISOR | | | CITY OF WEST PALM BEACH PUBLIC UTILITIES, 561-822-2262 | | | [email protected] | | | | | | -UTILITY EASEMENT NEED BE GRANTED FOR PROPOSED WATER | | | SERVICE AND METER AT NW CORNER OF PROPERTY. BACKFLOW | | | ASSEMBLY SHOULD NOT BE LOCATED IN THAT EASEMENT. PLEASE | | | DRAW AND LABEL ON WATER PLAN C-6. | | | -ROOT BARRIER NEED BE ADDED BETWEEN NEW WATER METER & | | | BACKFLOW ASSEMBLY AND THE TREE ON NORTH SIDE OF IT IF | | | THE ROOTS COULD POTENTIALLY ENCROACH ON THEM. | | | -PLEASE INCLUDE UPDATED REVISION WATER SERVICE STANDARD | | | DETAILS IN ENGINEERING SUBMITTAL. THE ONES INCLUDED IN | | | PLAN ARE OUTDATED. | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | | | | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES | | | DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR, WEST PALM BEACH, FL | | | 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | DIRECT: (561) 494-1098 | | | MOBILE: (561) 246-9525 | | | FAX: (561) 494-1116 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
F |
Date |
07-30-2020 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
07-30-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
07-30-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-07-30 12:41:31 | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD | | | CUSTOMER SERVICE SUPERVISOR | | | CITY OF WEST PALM BEACH PUBLIC UTILITIES, 561-822-2262 | | | [email protected] | | | | | | -VERIFY IF EXISTING WATER SERVICE AND METER SIZE WILL | | | BE SUFFICIENT. MAY CREATE SIGNIFICANT PROBLEMS IF NOT. | | | -VERIFY THAT WATER SERVICE WILL NOT BE FEEDING FIRE | | | SPRINKLERS. IF NEED WATER FOR FIRE SPRINKLERS, WOULD | | | NEED SEPARATE DEDICATED DCDA WATER SERVICE. | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | | | | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES | | | DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR, WEST PALM BEACH, FL | | | 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | DIRECT: (561) 494-1098 | | | MOBILE: (561) 246-9525 | | | FAX: (561) 494-1116 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
04-07-2020 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
04-07-2020 |
Time |
|
Rev Time |
|
| Received By |
rrossano |
Date |
04-07-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-04-07 13:47:50 | 1. PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY | | | OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC | | | RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF | | | YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE | | | MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL | | | IN THE WPB ENGINEERING SERVICES DEPARTMENT AT | | | [email protected] OR 561-494-1079 FOR FURTHER | | | ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION | | | ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD | | | SURVEY, POT-HOLING, SOFT DIGS ETC. | | | 2. AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH | | | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, | | | STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR | | | MORE INFORMATION, REFER TO THE LINK BELOW: | | | HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI | | | CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL | | | 3. PLEASE SUBMIT PRELIMINARY UTILITY ENGINEERING PLANS. | | | PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS OF | | | ALL WATER, STORM WATER, AND SANITARY AND SEWER LINES, | | | INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND | | | SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES, | | | METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE | | | SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING | | | GRADES, PIPES SIZES, MATERIALS, ELEVATIONS, | | | ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL | | | INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER | | | LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE | | | PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN | | | VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. | | | ADDITIONALLY, PLAN VIEW SHALL SHOW ALL EXISTING AND | | | PROPOSED UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER | | | OPTIC, ELECTRIC, GAS, AND CABLEVISION & | | | TELECOMMUNICATION FACILITIES LOCATED ON THE | | | RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL | | | UTILITY CROSSINGS. CUT AND CAP UTILITIES NOT IN USE, | | | AND REMOVE ANY ABANDONED UTILITY LINES LARGER THAN 2 | | | INCHES FROM CITY RIGHT OF WAY. | | | 4. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE | | | DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB | | | DEVELOPMENT APPLICATION). | | | 5. SHOW DIMENSIONS OF PROPOSED DUMPSTER ENCLOSURE PER | | | CURRENT CITY OF WPB STANDARD DETAIL GC-8. | | | 6. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY | | | SEWER ARE REQUIRED. | | | 7. PLEASE CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA | | | AND FIRE BACKFLOW PREVENTER AS DCDA. | | | 8. PROVIDE VERTICAL DATUM AND DATUM CONVERSION | | | INFORMATION (NAVD 1988 AND NGVD 1929). | | | 9. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND | | | PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM | | | AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE | | | PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER. | | | 10. PROVIDE CCTV VIDEO OF EXISTING SANITARY AND STORM | | | SEWER ALONG ENTIRE PROJECT FRONTAGE. | | | 11. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | EASEMENT FOR PLACEMENT OF PROPOSED WATER METERS. | | | 12. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER | | | METER AND BACKFLOW PREVENTION. | | | 13. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES | | | OF WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS. | | | 14. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING | | | APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT | | | SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING | | | SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED | | | LEAD-FREE DESIGN. | | | 15. FOR FORMAL ENGINEERING SUBMITTAL CLEARLY SHOW ROAD | | | RIGHT OF WAY. | | | 16. FOR FORMAL ENGINEERING SUBMITTAL PROVIDE SANITARY | | | ELEVATIONS AT MANHOLE TIE-IN. | | | 17. FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY MAINS | | | ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY | | | LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT | | | PARCELS. | | | 18. FOR FORMAL ENGINEERING SUBMITTAL, IF WATER MAINS | | | ARE BEING REPLACED IN ROW, SHOW ADJACENT PARCEL | | | ADDRESSES. | | | 19. FOR FORMAL ENGINEERING SUBMITTAL, ADD NOTE TO | | | PROVIDE 50 FT. PAVEMENT RESTORATION TRANSITION ON EACH | | | SIDE OF PROPOSED TRENCH IN CITY MAINTAINED ROADWAY | | | AREAS PER CITY OF WPB STANDARD DETAIL GC-9. | | | 20. PLEASE NOTE THAT A PRE-PPRC-SUBMITTAL MEETING WITH | | | ENGINEERING SERVICES IS HIGHLY SUGGESTED. | | | 21. PLEASE RESPOND TO ALL COMMENTS IN WRITING. | | | | | | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD | | | CUSTOMER SERVICE SUPERVISOR | | | CITY OF WEST PALM BEACH PUBLIC UTILITIES, 561-822-2262 | | | [email protected] | | | | | | -DO NOT SEE UTILITY PLAN ? NEED TO SUBMIT UTILITY PLAN | | | THAT SHOWS EXISTING AND PROPOSED UTILITIES INCLUDING | | | GAS & WATER. | | | -BACKFLOW ASSEMBLY NOT SHOWN ON CIVIL PLANS. | | | -NEED CALCULATE WATER DEMAND AND IF EXISTING WATER | | | SERVICE WILL BE SUFFICIENT. IF NEED LARGER WATER | | | SERVICE & METER, MAY TAKE UP MORE SPACE AND REQUIRE | | | UTILITY EASEMENT OUT OF SIDEWALK. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | | | | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES | | | DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR, WEST PALM BEACH, FL | | | 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | DIRECT: (561) 494-1098 | | | MOBILE: (561) 246-9525 | | | FAX: (561) 494-1116 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
03-30-2020 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
03-30-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
03-30-2020 |
Time |
15:00 |
Sent To |
|
|
| Notes |
| 2020-03-30 15:03:12 | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, | | | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM | | | BEACH FIRE RESCUE. | | | | | | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE | | | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. | | | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS | | | ARE SUBMITTED FOR PERMIT. | | | | | | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE | | | PROPOSED PROJECT. | | | | | | 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY | | | WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE | | | PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A | | | PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED | | | TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN | | | STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY | | | MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER | | | PROTECTION. | | | | | | 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY | | | IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING | | | ALL CONSTRUCTION ACTIVITIES. | | | | | | 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM | | | ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION. | | | ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND | | | AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT | | | WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS. | | | | | | 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE | | | REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE | | | ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS. | | | | | | 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH | | | THE 6TH EDITION OF THE FLORIDA FIRE PREVENTION CODE, | | | INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES. | | | | | | 6. FOR PLAN REVIEW SUBMITTAL, PLEASE INCLUDE THE | | | OCCUPANCY TYPE, PER THE FLORIDA FIRE PREVENTION CODE. | | | | | | 7. FOR PLAN REVIEW SUBMITTAL, PLEASE ENSURE THAT A FIRE | | | LOAD CALCULATION IS INCLUDED AND THAT ADEQUATE WATER | | | SUPPLY IS EXISTING OR WILL BE PROVIDED. | | | | | | 8. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED | | | ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF | | | FIRE PREVENTION. | | | | | | ANY PROPOSED LOCATIONS SHALL BE CLOSELY COORDINATED | | | WITH THE BUREAU OF FIRE PREVENTION. | | | | | | 9. PROVIDE FOR A FIRE SPRINKLER AND/OR FIRE ALARM PER | | | THE APPLICABLE OCCUPANCY CODE. FOR ANY LIFE SAFETY | | | ENGINEERED SYSTEM, I.E FIRE SPRINKLER AND FIRE ALARM, | | | ENSURE THEY COMPLY WITH THE REQUIREMENTS OF FS 61G AND | | | SUBMITTED WITH THE MASTER PERMIT. | | | | | | 9A) THE LOCATION OF ANY APPLICABLE DDCV AND FIRE LINE | | | LOCATIONS SHALL MEET THE REQUIREMENTS OF NFPA 24 AND | | | SHALL BE COORDINATED WITH THE OFFICE OF FIRE MARSHAL, | | | THE CITY'S ENGINEERS OFFICE, THE LANDSCAPE PLANNER, AND | | | THE CITY'S PLANNING AND ZONING OFFICE. | | | | | | 10. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL | | | BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL | | | DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS, | | | EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A | | | PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE | | | SAFETY FEATURES AND EQUIPMENT. | | | | | | 11. IT IS HIGHLY RECOMMENDED (REQUIRED WITH FIRE | | | SPRINKLER SYSTEM) THAT A KNOX BOX WITH KEYS FOR ENTRY | | | DOOR LOCKS BE PROVIDED FOR 24 HOUR EMERGENCY ACCESS. | | | | | | 12. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT | | | DOES NOT CONSTITUTE ITS FINAL REVIEW OR APPROVAL. | | | | | | 13. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING | | | PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH | | | THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
4 |
Status |
P |
Date |
11-04-2020 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
11-04-2020 |
Time |
09:41 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
11-04-2020 |
Time |
09:41 |
Sent To |
|
|
| Notes |
| 2020-11-04 09:41:30 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 2835 BELVEDERE RD Z20030026 | | | NOVEMBER 4, 2020 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. SATISFIED. PROVIDE A TREE DISPOSITION CHART SHOWING | | | THE 2 PALMS TO BE REMOVED, AND 50 SQ FT EACH MITIGATION | | | DUE. | | | | | | 2. SATISFIED. CORRECT THE CALCULATIONS FOR REQUIRED | | | MINIMUM SHADE TREE AND FLOWERING TREE REQUIREMENTS PER | | | SECTION 94-443(C)(2)B. BASED ON REQUIRED OPEN SPACE OF | | | 40%. 9429 SQ FT REQUIRES 7 SHADE TREES AND 2 FLOWERING | | | TREES. | | | CORRECTIONS NOT MADE TO CHART. | | | | | | 3. SATISFIED. PROVIDE THE REQUIRED TERMINAL LANDSCAPE | | | ISLAND WITH 8 FEET LANDSCAPE WIDTH AT THE END OF EACH | | | ROW OF PARKING ALONG THE NORTH BUFFER. THE 5 FEET OF | | | REQUIRED LANDSCAPE BUFFER CAN BE A PART OF THE TERMINAL | | | ISLAND, BUT THE 8 FEET INSIDE CURB MUST BE PROVIDED. | | | THE REQUIRED TREE MUST BE PROVIDED IN ADDITION TO THE | | | BUFFER TREE REQUIREMENT. | | | TERMINAL ISLAND NEEDS TO BE 8 FEET NEXT TO LOADING | | | ZONE. | | | LOADING ZONE HAS MOVED, BUT STILL NEEDS TERMINAL ISLAND | | | WITH 8 FEET LANDSCAPE WIDTH. | | | | | | 4. SATISFIED. SHORTEN THE PARKING AREA TO ELIMINATE THE | | | TURN AROUND FROM ENCROACHING INTO THE NORTH LANDSCAPE | | | BUFFER. | | | | | | | | | 5. SATISFIED. SECTION 94-443(C)(3) REQUIRES THAT A | | | MINIMUM OF 75 PERCENT OF ALL TREES THAT ARE REQUIRED TO | | | BE PLANTED WITHIN THE INTERIOR OF AN OFF STREET PARKING | | | AREA SHALL BE CATEGORY 1 SHADE TREES. SHOW THE | | | PERCENTAGE OF CATEGORY 1 TREES PROVIDED FOR THE | | | REQUIRED LANDSCAPE AREAS AS REQUIRED BY SECTION | | | 94-443(C)(3) FOR TERMINAL AND INTERIOR ISLANDS. THERE | | | ARE 10 REQUIRED TREES. | | | | | | 6. SATISFIED. PROVIDE A PLAN SHOWING THE PARKING | | | LANDSCAPE AREAS COUNTED TOWARD COMPLIANCE WITH SECTION | | | 94-443(C)(3) AND (4) AND PROVIDE CALCULATIONS. PROVIDE | | | THE TOTAL REQUIRED AND PROVIDED AS ONE TOTAL FOR BOTH | | | SECTIONS. | | | TOTAL THE SQUARE FOOTAGE OF REQUIRED LANDSCAPE AREA | | | FROM BOTH SECTIONS. INTERIOR LANDSCAPING FOR VEHICULAR | | | USE AREA TO BE COUNTED TOWARD COMPLIANCE HAS TO BE | | | WITHIN THE PARKING FIELD PER 94-443 FIGURE XIV-1, SHOW | | | AREA. SHOW AREA AND LABEL FOR PARKING SPACES AND SHOW | | | SEPARATELY FOR VEHICULAR USE AREA. | | | | | | LANDSCAPE AREAS ARE REQUIRED TO BE WITHIN THE BORDERS | | | OF THE PARKING AREA. SEE DIAGRAM CALLED OUT ABOVE. | | | | | | 7. SATISFIED. STAFF SUGGESTS REDUCING THE PAVED AREAS | | | FOR PARKING SPACES AND USING CURBS INSTEAD OF WHEEL | | | STOPS TO ALLOW FOR PERVIOUS LANDSCAPE AREA AT THE | | | OVERHANG. THIS ALSO ALLOWS MORE LANDSCAPE AREA FOR | | | SUPPORTING THE ROOT ZONES OF THE TREES. | | | | | | 8. SATISFIED. BUFFER LENGTHS REQUIRE ONE TREE PER 30 | | | FEET OR PORTION THEREOF. WEST BUFFER LENGTH IS 101.565 | | | (89.70+ 11.865) AND REQUIRES 4 TREES, SOUTH BUFFER | | | LENGTH IS 231.685 (219.82 + 11.865) AND REQUIRES 8 | | | TREES, NORTH BUFFER REQUIRES 8 TREES, AND EAST BUFFER | | | REQUIRES 4 TREES. MAKE CORRECTIONS AND ADD EQUIVALENT | | | OF 4 TREES TO EAST BUFFER. | | | EAST BUFFER REQUIRES 4 TREES, PLAN SHOWS 12 SABAL PALMS | | | MEETING REQUIREMENT. CORRECT THE CHART TO MATCH PLAN | | | INSTEAD OF ZERO SHOWN. | | | | | | 9. SATISFIED. ADJUST TREE SIZE REQUIREMENT IN CHART ON | | | L-2.1 TO MINIMUM OF 12 FEET IN HEIGHT. | | | NOT CORRECTED, STILL SAYS 8? HT., 5?CLEAR TRUNK. | | | | | | | | | 10. SATISFIED. UPDATE THE DESIGN OPTIONS CHART FOR | | | FLORIDA FRIENDLY LANDSCAPE REQUIREMENTS PER SECTION | | | 94-442(G) TO THE CURRENT CODE AND PROVIDE THE REQUIRED | | | 50 POINTS. | | | CHART DOES NOT PROVIDE 50 POINTS, ONLY SHOWS 35. CANNOT | | | COUNT 51% TWICE FOR TREES, ONE MUST BE 25-50%. | | | NOT CORRECTED FOR TREES. | | | | | | 11. SATISFIED. ADD A SECTION IN THE LANDSCAPE DATA | | | CHART TO COMPLY WITH SECTION 94-445 L. PLANT SPECIES. A | | | MINIMUM OF 60 PERCENT OF PLANT MATERIAL ADDED SHALL BE | | | FLORIDA NATIVE OR DROUGHT TOLERANT SPECIES SELECTED | | | FROM THE CITY LIST OR THE LIST OF SPECIES IN THE MOST | | | RECENT EDITION OF SOUTH FLORIDA WATER MANAGEMENT | | | DISTRICT WATERWISE SOUTH FLORIDA LANDSCAPES. | | | PROVIDE THE TOTAL PERCENTAGE OF NATIVE AND DROUGHT | | | TOLERANT PLANTS BASED ON FINAL PLANT LIST. | | | PERCENTAGE NOT FOUND. | | | | | | 12. SATISFIED. SHOW LOCATIONS OF FPL TRANSFORMERS ON | | | THE LANDSCAPE PLAN AND RESOLVE CONFLICTS WITH | | | LANDSCAPING. | | | | | | 13. SATISFIED. SHOW LOCATIONS OF ALL PROPOSED WATER, | | | SEWER AND DRAINAGE LINES ON THE LANDSCAPE PLAN. | | | | | | 14. SATISFIED. PROVIDE A DETAIL AND LOCATIONS OF ROOT | | | BARRIERS TO SEPARATE LANDSCAPING FROM UTILITY LINES. | | | | | | 15. SATISFIED. PROVIDE SCREENING FOR ALL GROUND MOUNTED | | | VALVES AND EQUIPMENT. | | | | | | 16. SATISFIED. SHOW THE LOCATIONS OF ALL SITE LIGHTING | | | ON THE LANDSCAPE PLAN AND REDESIGN THE LOCATIONS OF THE | | | LIGHTING ON SHORTER POLES TO RESOLVE ANY CONFLICTS WITH | | | TREES IN THE PARKING AREA LANDSCAPE ISLANDS. | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
3 |
Status |
F |
Date |
09-25-2020 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
09-25-2020 |
Time |
11:38 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
09-25-2020 |
Time |
11:38 |
Sent To |
|
|
| Notes |
| 2020-09-25 11:38:39 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 2835 BELVEDERE RD Z20030026 | | | SEPTEMBER 25, 2020 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. SATISFIED. PROVIDE A TREE DISPOSITION CHART SHOWING | | | THE 2 PALMS TO BE REMOVED, AND 50 SQ FT EACH MITIGATION | | | DUE. | | | | | | 2. SATISFIED. CORRECT THE CALCULATIONS FOR REQUIRED | | | MINIMUM SHADE TREE AND FLOWERING TREE REQUIREMENTS PER | | | SECTION 94-443(C)(2)B. BASED ON REQUIRED OPEN SPACE OF | | | 40%. 9429 SQ FT REQUIRES 7 SHADE TREES AND 2 FLOWERING | | | TREES. | | | CORRECTIONS NOT MADE TO CHART. | | | | | | 3. PARTIALLY SATISFIED. PROVIDE THE REQUIRED TERMINAL | | | LANDSCAPE ISLAND WITH 8 FEET LANDSCAPE WIDTH AT THE END | | | OF EACH ROW OF PARKING ALONG THE NORTH BUFFER. THE 5 | | | FEET OF REQUIRED LANDSCAPE BUFFER CAN BE A PART OF THE | | | TERMINAL ISLAND, BUT THE 8 FEET INSIDE CURB MUST BE | | | PROVIDED. THE REQUIRED TREE MUST BE PROVIDED IN | | | ADDITION TO THE BUFFER TREE REQUIREMENT. | | | TERMINAL ISLAND NEEDS TO BE 8 FEET NEXT TO LOADING | | | ZONE. | | | LOADING ZONE HAS MOVED, BUT STILL NEEDS TERMINAL ISLAND | | | WITH 8 FEET LANDSCAPE WIDTH. | | | | | | 4. SATISFIED. SHORTEN THE PARKING AREA TO ELIMINATE THE | | | TURN AROUND FROM ENCROACHING INTO THE NORTH LANDSCAPE | | | BUFFER. | | | | | | | | | 5. SATISFIED. SECTION 94-443(C)(3) REQUIRES THAT A | | | MINIMUM OF 75 PERCENT OF ALL TREES THAT ARE REQUIRED TO | | | BE PLANTED WITHIN THE INTERIOR OF AN OFF STREET PARKING | | | AREA SHALL BE CATEGORY 1 SHADE TREES. SHOW THE | | | PERCENTAGE OF CATEGORY 1 TREES PROVIDED FOR THE | | | REQUIRED LANDSCAPE AREAS AS REQUIRED BY SECTION | | | 94-443(C)(3) FOR TERMINAL AND INTERIOR ISLANDS. THERE | | | ARE 10 REQUIRED TREES. | | | | | | 6. PARTIALLY SATISFIED. PROVIDE A PLAN SHOWING THE | | | PARKING LANDSCAPE AREAS COUNTED TOWARD COMPLIANCE WITH | | | SECTION 94-443(C)(3) AND (4) AND PROVIDE CALCULATIONS. | | | PROVIDE THE TOTAL REQUIRED AND PROVIDED AS ONE TOTAL | | | FOR BOTH SECTIONS. | | | TOTAL THE SQUARE FOOTAGE OF REQUIRED LANDSCAPE AREA | | | FROM BOTH SECTIONS. INTERIOR LANDSCAPING FOR VEHICULAR | | | USE AREA TO BE COUNTED TOWARD COMPLIANCE HAS TO BE | | | WITHIN THE PARKING FIELD PER 94-443 FIGURE XIV-1, SHOW | | | AREA. SHOW AREA AND LABEL FOR PARKING SPACES AND SHOW | | | SEPARATELY FOR VEHICULAR USE AREA. | | | | | | LANDSCAPE AREAS ARE REQUIRED TO BE WITHIN THE BORDERS | | | OF THE PARKING AREA. SEE DIAGRAM CALLED OUT ABOVE. | | | | | | 7. SATISFIED. STAFF SUGGESTS REDUCING THE PAVED AREAS | | | FOR PARKING SPACES AND USING CURBS INSTEAD OF WHEEL | | | STOPS TO ALLOW FOR PERVIOUS LANDSCAPE AREA AT THE | | | OVERHANG. THIS ALSO ALLOWS MORE LANDSCAPE AREA FOR | | | SUPPORTING THE ROOT ZONES OF THE TREES. | | | | | | 8. SATISFIED. BUFFER LENGTHS REQUIRE ONE TREE PER 30 | | | FEET OR PORTION THEREOF. WEST BUFFER LENGTH IS 101.565 | | | (89.70+ 11.865) AND REQUIRES 4 TREES, SOUTH BUFFER | | | LENGTH IS 231.685 (219.82 + 11.865) AND REQUIRES 8 | | | TREES, NORTH BUFFER REQUIRES 8 TREES, AND EAST BUFFER | | | REQUIRES 4 TREES. MAKE CORRECTIONS AND ADD EQUIVALENT | | | OF 4 TREES TO EAST BUFFER. | | | EAST BUFFER REQUIRES 4 TREES, PLAN SHOWS 12 SABAL PALMS | | | MEETING REQUIREMENT. CORRECT THE CHART TO MATCH PLAN | | | INSTEAD OF ZERO SHOWN. | | | | | | 9. SATISFIED. ADJUST TREE SIZE REQUIREMENT IN CHART ON | | | L-2.1 TO MINIMUM OF 12 FEET IN HEIGHT. | | | NOT CORRECTED, STILL SAYS 8? HT., 5?CLEAR TRUNK. | | | | | | | | | 10. PARTIALLY SATISFIED. UPDATE THE DESIGN OPTIONS | | | CHART FOR FLORIDA FRIENDLY LANDSCAPE REQUIREMENTS PER | | | SECTION 94-442(G) TO THE CURRENT CODE AND PROVIDE THE | | | REQUIRED 50 POINTS. | | | CHART DOES NOT PROVIDE 50 POINTS, ONLY SHOWS 35. CANNOT | | | COUNT 51% TWICE FOR TREES, ONE MUST BE 25-50%. | | | NOT CORRECTED FOR TREES. | | | | | | 11. SATISFIED. ADD A SECTION IN THE LANDSCAPE DATA | | | CHART TO COMPLY WITH SECTION 94-445 L. PLANT SPECIES. A | | | MINIMUM OF 60 PERCENT OF PLANT MATERIAL ADDED SHALL BE | | | FLORIDA NATIVE OR DROUGHT TOLERANT SPECIES SELECTED | | | FROM THE CITY LIST OR THE LIST OF SPECIES IN THE MOST | | | RECENT EDITION OF SOUTH FLORIDA WATER MANAGEMENT | | | DISTRICT WATERWISE SOUTH FLORIDA LANDSCAPES. | | | PROVIDE THE TOTAL PERCENTAGE OF NATIVE AND DROUGHT | | | TOLERANT PLANTS BASED ON FINAL PLANT LIST. | | | PERCENTAGE NOT FOUND. | | | | | | 12. SATISFIED. SHOW LOCATIONS OF FPL TRANSFORMERS ON | | | THE LANDSCAPE PLAN AND RESOLVE CONFLICTS WITH | | | LANDSCAPING. | | | | | | 13. SATISFIED. SHOW LOCATIONS OF ALL PROPOSED WATER, | | | SEWER AND DRAINAGE LINES ON THE LANDSCAPE PLAN. | | | | | | 14. SATISFIED. PROVIDE A DETAIL AND LOCATIONS OF ROOT | | | BARRIERS TO SEPARATE LANDSCAPING FROM UTILITY LINES. | | | | | | 15. SATISFIED. PROVIDE SCREENING FOR ALL GROUND MOUNTED | | | VALVES AND EQUIPMENT. | | | | | | 16. SATISFIED. SHOW THE LOCATIONS OF ALL SITE LIGHTING | | | ON THE LANDSCAPE PLAN AND REDESIGN THE LOCATIONS OF THE | | | LIGHTING ON SHORTER POLES TO RESOLVE ANY CONFLICTS WITH | | | TREES IN THE PARKING AREA LANDSCAPE ISLANDS. | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
F |
Date |
06-22-2020 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
06-22-2020 |
Time |
16:34 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
06-22-2020 |
Time |
16:34 |
Sent To |
|
|
| Notes |
| 2020-06-22 16:34:48 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 2835 BELVEDERE RD Z20030026 | | | JUNE 22, 2020 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. SATISFIED. PROVIDE A TREE DISPOSITION CHART SHOWING | | | THE 2 PALMS TO BE REMOVED, AND 50 SQ FT EACH MITIGATION | | | DUE. | | | | | | 2. NOT SATISFIED. CORRECT THE CALCULATIONS FOR REQUIRED | | | MINIMUM SHADE TREE AND FLOWERING TREE REQUIREMENTS PER | | | SECTION 94-443(C)(2)B. BASED ON REQUIRED OPEN SPACE OF | | | 40%. 9429 SQ FT REQUIRES 7 SHADE TREES AND 2 FLOWERING | | | TREES. | | | CORRECTIONS NOT MADE TO CHART. | | | | | | 3. PARTIALLY SATISFIED. PROVIDE THE REQUIRED TERMINAL | | | LANDSCAPE ISLAND WITH 8 FEET LANDSCAPE WIDTH AT THE END | | | OF EACH ROW OF PARKING ALONG THE NORTH BUFFER. THE 5 | | | FEET OF REQUIRED LANDSCAPE BUFFER CAN BE A PART OF THE | | | TERMINAL ISLAND, BUT THE 8 FEET INSIDE CURB MUST BE | | | PROVIDED. THE REQUIRED TREE MUST BE PROVIDED IN | | | ADDITION TO THE BUFFER TREE REQUIREMENT. | | | TERMINAL ISLAND NEEDS TO BE 8 FEET NEXT TO LOADING | | | ZONE. | | | | | | 4. SATISFIED. SHORTEN THE PARKING AREA TO ELIMINATE THE | | | TURN AROUND FROM ENCROACHING INTO THE NORTH LANDSCAPE | | | BUFFER. | | | | | | | | | 5. SATISFIED. SECTION 94-443(C)(3) REQUIRES THAT A | | | MINIMUM OF 75 PERCENT OF ALL TREES THAT ARE REQUIRED TO | | | BE PLANTED WITHIN THE INTERIOR OF AN OFF STREET PARKING | | | AREA SHALL BE CATEGORY 1 SHADE TREES. SHOW THE | | | PERCENTAGE OF CATEGORY 1 TREES PROVIDED FOR THE | | | REQUIRED LANDSCAPE AREAS AS REQUIRED BY SECTION | | | 94-443(C)(3) FOR TERMINAL AND INTERIOR ISLANDS. THERE | | | ARE 10 REQUIRED TREES. | | | | | | 6. PARTIALLY SATISFIED. PROVIDE A PLAN SHOWING THE | | | PARKING LANDSCAPE AREAS COUNTED TOWARD COMPLIANCE WITH | | | SECTION 94-443(C)(3) AND (4) AND PROVIDE CALCULATIONS. | | | PROVIDE THE TOTAL REQUIRED AND PROVIDED AS ONE TOTAL | | | FOR BOTH SECTIONS. | | | TOTAL THE SQUARE FOOTAGE OF REQUIRED LANDSCAPE AREA | | | FROM BOTH SECTIONS. INTERIOR LANDSCAPING FOR VEHICULAR | | | USE AREA TO BE COUNTED TOWARD COMPLIANCE HAS TO BE | | | WITHIN THE PARKING FIELD PER 94-443 FIGURE XIV-1, SHOW | | | AREA. SHOW AREA AND LABEL FOR PARKING SPACES AND SHOW | | | SEPARATELY FOR VEHICULAR USE AREA. | | | | | | 7. SATISFIED. STAFF SUGGESTS REDUCING THE PAVED AREAS | | | FOR PARKING SPACES AND USING CURBS INSTEAD OF WHEEL | | | STOPS TO ALLOW FOR PERVIOUS LANDSCAPE AREA AT THE | | | OVERHANG. THIS ALSO ALLOWS MORE LANDSCAPE AREA FOR | | | SUPPORTING THE ROOT ZONES OF THE TREES. | | | | | | 8. PARTIALLY SATISFIED. BUFFER LENGTHS REQUIRE ONE TREE | | | PER 30 FEET OR PORTION THEREOF. WEST BUFFER LENGTH IS | | | 101.565 (89.70+ 11.865) AND REQUIRES 4 TREES, SOUTH | | | BUFFER LENGTH IS 231.685 (219.82 + 11.865) AND REQUIRES | | | 8 TREES, NORTH BUFFER REQUIRES 8 TREES, AND EAST BUFFER | | | REQUIRES 4 TREES. MAKE CORRECTIONS AND ADD EQUIVALENT | | | OF 4 TREES TO EAST BUFFER. | | | EAST BUFFER REQUIRES 4 TREES, PLAN SHOWS 12 SABAL PALMS | | | MEETING REQUIREMENT. CORRECT THE CHART TO MATCH PLAN | | | INSTEAD OF ZERO SHOWN. | | | | | | 9. NOT SATISFIED. ADJUST TREE SIZE REQUIREMENT IN CHART | | | ON L-2.1 TO MINIMUM OF 12 FEET IN HEIGHT. | | | NOT CORRECTED, STILL SAYS 8? HT., 5?CLEAR TRUNK. | | | | | | | | | 10. PARTIALLY SATISFIED. UPDATE THE DESIGN OPTIONS | | | CHART FOR FLORIDA FRIENDLY LANDSCAPE REQUIREMENTS PER | | | SECTION 94-442(G) TO THE CURRENT CODE AND PROVIDE THE | | | REQUIRED 50 POINTS. | | | CHART DOES NOT PROVIDE 50 POINTS, ONLY SHOWS 35. CANNOT | | | COUNT 51% TWICE FOR TREES, ONE MUST BE 25-50%. | | | | | | 11. NOT SATISFIED. ADD A SECTION IN THE LANDSCAPE DATA | | | CHART TO COMPLY WITH SECTION 94-445 L. PLANT SPECIES. A | | | MINIMUM OF 60 PERCENT OF PLANT MATERIAL ADDED SHALL BE | | | FLORIDA NATIVE OR DROUGHT TOLERANT SPECIES SELECTED | | | FROM THE CITY LIST OR THE LIST OF SPECIES IN THE MOST | | | RECENT EDITION OF SOUTH FLORIDA WATER MANAGEMENT | | | DISTRICT WATERWISE SOUTH FLORIDA LANDSCAPES. | | | PROVIDE THE TOTAL PERCENTAGE OF NATIVE AND DROUGHT | | | TOLERANT PLANTS BASED ON FINAL PLANT LIST. | | | PERCENTAGE NOT FOUND. | | | | | | 12. SATISFIED. SHOW LOCATIONS OF FPL TRANSFORMERS ON | | | THE LANDSCAPE PLAN AND RESOLVE CONFLICTS WITH | | | LANDSCAPING. | | | | | | 13. SATISFIED. SHOW LOCATIONS OF ALL PROPOSED WATER, | | | SEWER AND DRAINAGE LINES ON THE LANDSCAPE PLAN. | | | | | | 14. SATISFIED. PROVIDE A DETAIL AND LOCATIONS OF ROOT | | | BARRIERS TO SEPARATE LANDSCAPING FROM UTILITY LINES. | | | | | | 15. SATISFIED. PROVIDE SCREENING FOR ALL GROUND MOUNTED | | | VALVES AND EQUIPMENT. | | | | | | 16. SATISFIED. SHOW THE LOCATIONS OF ALL SITE LIGHTING | | | ON THE LANDSCAPE PLAN AND REDESIGN THE LOCATIONS OF THE | | | LIGHTING ON SHORTER POLES TO RESOLVE ANY CONFLICTS WITH | | | TREES IN THE PARKING AREA LANDSCAPE ISLANDS. | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
04-07-2020 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
04-07-2020 |
Time |
15:59 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
04-07-2020 |
Time |
15:59 |
Sent To |
|
|
| Notes |
| 2020-04-07 15:59:28 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 | | | PROJECT: 2835 BELVEDERE RD Z20030026 | | | APRIL 7, 2020 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. PROVIDE A TREE DISPOSITION CHART SHOWING THE 2 PALMS | | | TO BE REMOVED, AND 50 SQ FT EACH MITIGATION DUE. | | | | | | 2. CORRECT THE CALCULATIONS FOR REQUIRED MINIMUM SHADE | | | TREE AND FLOWERING TREE REQUIREMENTS PER SECTION | | | 94-443(C)(2)B. BASED ON REQUIRED OPEN SPACE OF 40%. | | | 9429 SQ FT REQUIRES 7 SHADE TREES AND 2 FLOWERING | | | TREES. | | | | | | 3. PROVIDE THE REQUIRED TERMINAL LANDSCAPE ISLAND WITH | | | 8 FEET LANDSCAPE WIDTH AT THE END OF EACH ROW OF | | | PARKING ALONG THE NORTH BUFFER. THE 5 FEET OF REQUIRED | | | LANDSCAPE BUFFER CAN BE A PART OF THE TERMINAL ISLAND, | | | BUT THE 8 FEET INSIDE CURB MUST BE PROVIDED. THE | | | REQUIRED TREE MUST BE PROVIDED IN ADDITION TO THE | | | BUFFER TREE REQUIREMENT. | | | | | | 4. SHORTEN THE PARKING AREA TO ELIMINATE THE TURN | | | AROUND FROM ENCROACHING INTO THE NORTH LANDSCAPE | | | BUFFER. | | | | | | | | | 5. SECTION 94-443(C)(3) REQUIRES THAT A MINIMUM OF 75 | | | PERCENT OF ALL TREES THAT ARE REQUIRED TO BE PLANTED | | | WITHIN THE INTERIOR OF AN OFF STREET PARKING AREA SHALL | | | BE CATEGORY 1 SHADE TREES. SHOW THE PERCENTAGE OF | | | CATEGORY 1 TREES PROVIDED FOR THE REQUIRED LANDSCAPE | | | AREAS AS REQUIRED BY SECTION 94-443(C)(3) FOR TERMINAL | | | AND INTERIOR ISLANDS. THERE ARE 10 REQUIRED TREES. | | | | | | 6. PROVIDE A PLAN SHOWING THE PARKING LANDSCAPE AREAS | | | COUNTED TOWARD COMPLIANCE WITH SECTION 94-443(C)(3) AND | | | (4) AND PROVIDE CALCULATIONS. PROVIDE THE TOTAL | | | REQUIRED AND PROVIDED AS ONE TOTAL FOR BOTH SECTIONS. | | | | | | 7. STAFF SUGGESTS REDUCING THE PAVED AREAS FOR PARKING | | | SPACES AND USING CURBS INSTEAD OF WHEEL STOPS TO ALLOW | | | FOR PERVIOUS LANDSCAPE AREA AT THE OVERHANG. THIS ALSO | | | ALLOWS MORE LANDSCAPE AREA FOR SUPPORTING THE ROOT | | | ZONES OF THE TREES. | | | | | | 8. BUFFER LENGTHS REQUIRE ONE TREE PER 30 FEET OR | | | PORTION THEREOF. WEST BUFFER LENGTH IS 101.565 (89.70+ | | | 11.865) AND REQUIRES 4 TREES, SOUTH BUFFER LENGTH IS | | | 231.685 (219.82 + 11.865) AND REQUIRES 8 TREES, NORTH | | | BUFFER REQUIRES 8 TREES, AND EAST BUFFER REQUIRES 4 | | | TREES. MAKE CORRECTIONS AND ADD EQUIVALENT OF 4 TREES | | | TO EAST BUFFER. | | | | | | 9. ADJUST TREE SIZE REQUIREMENT IN CHART ON L-2.1 TO | | | MINIMUM OF 12 FEET IN HEIGHT. | | | | | | | | | 10. UPDATE THE DESIGN OPTIONS CHART FOR FLORIDA | | | FRIENDLY LANDSCAPE REQUIREMENTS PER SECTION 94-442(G) | | | TO THE CURRENT CODE AND PROVIDE THE REQUIRED 50 POINTS. | | | | | | 11. ADD A SECTION IN THE LANDSCAPE DATA CHART TO COMPLY | | | WITH SECTION 94-445 L. PLANT SPECIES. A MINIMUM OF 60 | | | PERCENT OF PLANT MATERIAL ADDED SHALL BE FLORIDA NATIVE | | | OR DROUGHT TOLERANT SPECIES SELECTED FROM THE CITY LIST | | | OR THE LIST OF SPECIES IN THE MOST RECENT EDITION OF | | | SOUTH FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH | | | FLORIDA LANDSCAPES. | | | PROVIDE THE TOTAL PERCENTAGE OF NATIVE AND DROUGHT | | | TOLERANT PLANTS BASED ON FINAL PLANT LIST. | | | | | | 12. SHOW LOCATIONS OF FPL TRANSFORMERS ON THE LANDSCAPE | | | PLAN AND RESOLVE CONFLICTS WITH LANDSCAPING. | | | | | | 13. SHOW LOCATIONS OF ALL PROPOSED WATER, SEWER AND | | | DRAINAGE LINES ON THE LANDSCAPE PLAN. | | | | | | 14. PROVIDE A DETAIL AND LOCATIONS OF ROOT BARRIERS TO | | | SEPARATE LANDSCAPING FROM UTILITY LINES. | | | | | | 15. PROVIDE SCREENING FOR ALL GROUND MOUNTED VALVES AND | | | EQUIPMENT. | | | | | | 16. SHOW THE LOCATIONS OF ALL SITE LIGHTING ON THE | | | LANDSCAPE PLAN AND REDESIGN THE LOCATIONS OF THE | | | LIGHTING ON SHORTER POLES TO RESOLVE ANY CONFLICTS WITH | | | TREES IN THE PARKING AREA LANDSCAPE ISLANDS. | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
3 |
Status |
P |
Date |
09-14-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
09-14-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
09-14-2020 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
2 |
Status |
F |
Date |
08-26-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
08-26-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
08-26-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-08-26 17:10:59 | PLEASE PROVIDE THE SITE PLAN, SHEET C-03, TO REMOVE THE | | | DUMPSTER ENCLOSURE AS THE TRASH CONTAINE(S) WILL BE | | | STORED INDOOR AND ROLLED OUT ON THE SERVICE DAYS. | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
F |
Date |
03-30-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
03-30-2020 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
03-30-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-03-30 11:04:10 | PLEASE PROVIDE THE FOLLOWINGS: | | | | | | 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID | | | WASTE VOLUME PRODUCED ALONG WITH THE SIZE AND TYPE OF | | | THE CONTAINER (I.E. DUMPSTER/COMPACTOR) THAT WILL BE | | | UTILIZED THAT WILL BE UTILIZED FOR THE SANITATION | | | SERVICE. | | | | | | 2- WHERE VISIBLE TO THE PUBLIC, COMMERCIAL CONTAINERS | | | SHALL BE STORED IN A CITY APPROVED ENCLOSURE | | | OBSTRUCTING THE CONTAINERS VIEW FROM PERSONS USING THE | | | SIDEWALK, STREET, OR THE COMMERCIAL ESTABLISHMENT'S | | | FACILITIES, EXCEPT WHEN ENCLOSURES ARE PROHIBITED, SUCH | | | AS IN DOWNTOWN ALLEYS, OR OTHERWISE APPROVED BY THE | | | CITY. THIS REQUIREMENT INDICATED IN THE CODE OF | | | ORDINANCES, SECTION 74-34-A-2-D. | | | | | | 3- DUMPSTER ENCLOSURE DETAIL. FOR A FREESTANDING SITE | | | DUMPSTER ENCLOSURE, THE ENCLOSURE SHALL COMPLY WITH THE | | | LATEST REVISION OF CITY OF WEST PALM BEACH GENERAL | | | CONSTRUCTION-GARBAGE ENCLOSURE STANDARD, CG-8. | | | | | | 4- AUTO TURN FOR THE SANITATION SERVICE, FRONT LOADER | | | TRUCK WITH THE FOLLOWING SPECS: | | | - TRUCK LENGTH: 35 FT | | | - TRUCK WIDTH: 11 FT | | | - TURNING RADIUS: | | | - SAE TURNING RADIUS: 32.5 FT | | | - CURB-TO-CURB DIAMETER: 74 FT | | | - WALL-TO-WALL DIAMETER: 86.3 FT | | | | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
4 |
Status |
F |
Date |
12-02-2020 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
12-02-2020 |
Time |
08:49 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
12-02-2020 |
Time |
09:33 |
Sent To |
|
|
| Notes |
| 2020-12-02 09:32:02 | THE FOLLOWING COMMENTS ARE BASED ON THE REVIEW OF THE | | | 10/16/2020 DISTRIBUTED PACKAGE. | | | | | | 1. RELOCATE DRAINAGE STRUCTURE NO. NO. 3 OUT OF THE | | | PROPOSED RIGHT OF WAY. | | | | | | 2. WEST INVERT ELEVATION AT STRUCTURE NO. 3 LABELED AS | | | EAST INVERT. | | | | | | 3. ADD A WEIR TO THE WEST INVERT ELEVATON OF STRUCTURE | | | NO. 3 AND LOWER THE WEST INVERT ELEVATON OF STRUCTURE | | | NO. 2 TO ALLOW ROOF DRAINAGE TO FLOW TOWARD THE | | | EXFILTRATION TRENCH FOR TREATMENT AND PEAK FLOW | | | ATTENUATION. | | | | | | 4. ADD A PRB TO STRUCTURE NO. 1 TO EXTEND THE LIFE OF | | | THE EXFILTRATION TRENCH. | | | | | | 5. SURVEY VERTICAL DATUM IS LISTED AS NAVD1988. THE | | | CIVIL ENGINEERING PLANS LIST THE VERTICAL DATUM AS | | | NGVD1929 ALTHOUGH THEY SHOW THE SAME VALUE FOR EXISTING | | | SPOT GRADES AS THE SURVEY. THE VERTICAL DATUM SHALL BE | | | CONSISTENT FOR ALL OF THE PLANS. THE CITY'S OFFICIAL | | | VERTICAL DATUM IS NGVD1929 BUT HAS ALLOWED THE USE OF | | | NAVD1988 PROVIDED THE CONVERSION BETWEEN THE TWO DATUMS | | | IS LISTED ALONG WITH THE VERTICAL DATUM ON EVERY SHEET | | | WITH ELEVATION INFORMATION. | | | | | | 6. DRAINAGE REPORT: | | | A. THE PROPOSED CONDITIONS CASCADE MODEL RESULTS SHOW | | | DISCHARGE WHEN THE HEADWATER STAGE IS LOWER THAN THE | | | UPSTREAM PIPE INVERT ELEVATION. | | | | | | B. THE EXISTING CONDITIONS CACADE MODEL RESULTS FOR THE | | | 5-YEAR EVENT SHOW CONSTANT CURRENT DISCHARGE OF 18.46 | | | CFS. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
3 |
Status |
F |
Date |
09-21-2020 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
09-21-2020 |
Time |
21:40 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
09-21-2020 |
Time |
23:10 |
Sent To |
|
|
| Notes |
| 2020-09-21 22:55:26 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 9/11/2020 ROUTED SUBMITTAL PACKAGE. | | | | | | 1. DRAINAGE CALCULATIONS: | | | A. REVIEW VALUE OF H2 IN THE EXFILTRATION CALCULATIONS | | | | | | B. REVIEW LENGTH OF 6-INCH PIPE IN THE CASCADE MODEL | | | AND THE LENGTH LISTED ON THE PGD PLANS. | | | | | | C. THE PROPOSED DRAINAGE AREA DOES NOT EQUAL THE | | | EXISTING DRAINAGE AREA. | | | | | | 2. SHOW THE PROPER WIDTH OF PAVEMENT MILL AND OVERLAY | | | (50 FEET EACH SIDE OF TRENCH CUT) ON PARKER AVE. MILL | | | AND OVERLAY LIMITS TO INCLUDE COMPLETE TRAVEL LANE. | | | | | | 3. PROVIDE TOPOGRAPHIC SURVEY OF AVAILABLE. | | | | | | 4. 6" HDPE PIPE WILL ONLY HAVE LESS THAN 6" OF COVER | | | WHERE IT CROSSES THE DRIVEWAY. | | | | | | 5. ADD WEST INVERT ELEVATION FOR STRUCTURE S-3. | | | | | | 6. SEE STALL PAINTING DETAIL IN SECTION 94-485.J OF THE | | | ZONING AND LAND DEVELOPMENT CODE. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
F |
Date |
08-24-2020 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
08-24-2020 |
Time |
18:17 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
08-25-2020 |
Time |
00:43 |
Sent To |
|
|
| Notes |
| 2020-08-25 00:42:03 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | AUGUST 5, 2020 SUBMITTAL REVIEW PACKAGE: | | | | | | 1. THE ENGINEERING PLANS INCLUDE EXFILTRATION TRENCH | | | DETAILS BUT THE DRAINAGE PLAN DOES NOT SHOW ANY | | | DRAINAGE STRUCTURES OR EXFILTRATION TRENCHES. [NOT | | | SATISFIED] THERE IS NO NEED TO INCLUDE DETAILS FOR | | | ITEMS THAT ARE NOT PART OF THE PLAN. | | | | | | 2. PROVIDE CROSS SECTIONS FROM ROAD CENTERLINES TO | | | FACES OF BUILDING. [PARTIALLY SATISFIED] LABEL S. DIXIE | | | HWY ON SECTION B-B. | | | | | | 2.1 [NEW COMMENT] REVIEW FL BUILDING CODE 1804.4 SITE | | | GRADING WITH REGARDS TO THE GRADING AROUND THE | | | BUILDING. | | | | | | 2.2 [NEW COMMENT] SHOW SWALES ALONG SOUTH AND EAST | | | PROPERTY LINES TO PREVENT DIRECT STORMWATER RUNOFF TO | | | THE SIDEWALK AND ADJACENT PROPERTY. | | | | | | 3. PROVIDE SWALES ON N, W AND S SIDES OF BUILDING TO | | | CAPTURE STORMWATER RUNOFF AND PROMOTE INFILTRATION. | | | (SATISFIED] | | | | | | 4. SHOW LOCATIONS OF THE ROOF DRAIN DOWNSPOUTS. THEY | | | SHOULD DISCHARGE TO PERVIOUS AREAS OR BE CONNECTED TO | | | THE DRAINAGE SYSTEM. [SATISFIED] SECOND PART OF | | | COMMMENT CAN BE CONDIITONAL APPROVAL OF THE SITE PLAN. | | | THE FIRST PART OF COMMENT CAN BE ADDRESSED WITH THE | | | ENGINEERING PERMIT SUBMITTAL. | | | | | | 5. BELVEDERE ROAD IS MAINTAINED BY PALM BEACH COUNTY. | | | APPROVAL FROM THE COUNTY IS REQUIRED FOR ANY | | | IMPROVEMENTS WITHIN BELVEDERE ROAD RIGHT OF WAY.[NOT | | | SATISFIED] SEE ADDITIONAL COMMENTS RELATED TO THE | | | BELVEDERE ROAD R/W BELOW. | | | | | | 6. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP | | | CRITERIA. [NOT SATISFIED] BELOW IS SOME BUT NOT ALL OF | | | THE SFWMD CRITERIA THAT WILL NEED TO BE MET. | | | A. OFFISTE DISCHARGE TO BE CONTROLLED UPTO AND | | | INCLUDING THE 25-YEAR 3-DAY STORM EVENT. \ | | | B. POST-DEVELOPMENT DISCHARGE RATE CANNOT EXCEED | | | PRE-DEVELOPMENT DISCHARGE RATE. | | | C. WATER QUALITY TREATMENT TO BE PROVIDED PER SFWMD | | | CRITERIA OF THE LARGER OF 1" OF RUNOFF OR 2.5" TIMES | | | PERCENT IMPERVIOUSNESS. | | | D. RETENTION/DETENION AREAS TO INCLUDE MECHANISMS FOR | | | RETURNING THE GROUNDWATER LEVEL TO CONTROL ELEVATION. | | | | | | NEW COMMENTS: | | | 7. REMOVE THE DRIVEWAY FLARES BEHIND THE SIDEWALK. | | | | | | 8. SHOW THE REPLACEMENT OF THE SIDEWALK WHERE THE | | | DRAINAGE PIPE IS BEING REMOVED. | | | | | | 9. REPLACE SIDEWALK ACROSS DRIVEWAY APRON IF SLOPES DO | | | NOT MEET ADA CRITERIA. | | | | | | 10. MOVE THE HIGHPOINT OF THE DRIVEWAY TO THE BACK OF | | | SIDEWALK. | | | | | | 11. THE IRRIGATION PLAN SHOWS PART OF THE IRRIGATION | | | SYSTEM OUTSIDE THE PROPERTY LINE. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
04-08-2020 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
04-08-2020 |
Time |
18:44 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
04-08-2020 |
Time |
18:46 |
Sent To |
|
|
| Notes |
| 2020-04-08 18:45:57 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. THE ENGINEERING PLANS INCLUDE EXFILTRATION TRENCH | | | DETAILS BUT THE DRAINAGE PLAN DOES NOT SHOW ANY | | | DRAINAGE STRUCTURES OR EXFILTRATION TRENCHES. | | | | | | 2. PROVIDE CROSS SECTIONS FROM ROAD CENTERLINES TO | | | FACES OF BUILDING. | | | | | | 3. PROVIDE SWALES ON N, W AND S SIDES OF BUILDING TO | | | CAPTURE STORMWATER RUNOFF AND PROMOTE INFILTRATION. | | | | | | 4. SHOW LOCATIONS OF THE ROOF DRAIN DOWNSPOUTS. THEY | | | SHOULD DISCHARGE TO PERVIOUS AREAS OR BE CONNECTED TO | | | THE DRAINAGE SYSTEM. | | | | | | 5. BELVEDERE ROAD IS MAINTAINED BY PALM BEACH COUNTY. | | | APPROVAL FROM THE COUNTY IS REQUIRED FOR ANY | | | IMPROVEMENTS WITHIN BELVEDERE ROAD RIGHT OF WAY. | | | | | | 6. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP | | | CRITERIA. | | | | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY | | | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. | | | | | | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED | | | WITH THE ENGINEERING PERMIT APPLICATION. | | | | | | 3. PROVIDE A COPY OF THE SFWMD ERP PRIOR TO STARTING | | | CONSTRUCTION. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
4 |
Status |
P |
Date |
11-12-2020 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
11-12-2020 |
Time |
08:49 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-11-12 08:51:14 | PASSED WITH CONDITIONS: | | | | | | 1. SUBDIVISION APPLICATION THRU PLANNING FOR RE-PLAT. | | | 2. COUNTY DEDICATION OF CORNER CUT AND MAINTENANCE OF | | | SIDEWALK. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
3 |
Status |
F |
Date |
09-17-2020 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
09-17-2020 |
Time |
13:26 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-09-17 13:33:34 | 1. SUBMIT FOR MINOR SUBDIVISION (REPLAT) THROUGH | | | PLANNING. PLAT CAN BE CONDITION OF C.O. | | | 2. COUNTY USUALLY WILL NOT ACCEPT DEDICATION OF R/W BY | | | PLAT. NEED LETTER FROM COUNTY STATING THIS REQUIREMENT | | | AND TIMING OF DEDICATION. | | | 3. DOES THE DEDICATION AFFECT THE BUILDING SETBACK? | | | 4. WILL THE COUNTY ACCEPT THE WIDENED SIDEWALK WITHIN | | | THE DEDICATION? IF NOT, MAINTENANCE RESPONSIBILITY WILL | | | BE THE PROPERTY OWNER. | | | 5. WILL REVIEW REVISED SURVEY UPON RECEIPT. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
F |
Date |
08-04-2020 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
08-04-2020 |
Time |
10:13 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-08-04 10:44:52 | 1. REPLAT WILL BE REQUIRED. ORIGINAL LOTS HAVE BEEN | | | SUBDIVIDED PREVIOUSLY. | | | 2. WHAT IS 40' X 40' ROW DEDICATION SHOWN ON SITE PLAN? | | | 3. ADDITIONAL SIDEWALK EASEMENT ALONG PARKER WILL NEED | | | TO BE DEDICATED BY PLAT. | | | 4. ACCESS EASEMENT OVER WIDENED ALLEY MAY BE REQUIRED. | | | 5. CORNER STILL NOT IDENTIFIED ON SURVEY. | | | 6. METER AND BOX SHOULD BE MOVED OUT OF SIDEWALK. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
04-08-2020 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
04-08-2020 |
Time |
08:44 |
Rev Time |
|
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-04-08 08:52:10 | 1. NO WATER AND SEWER PLANS PROVIDED. | | | 2. OWNERSHIP OF ALLEY NEEDS TO BE DETERMINED. | | | 3. ACCESS EASEMENT OVER WIDENED ALLEY WILL BE REQUIRED. | | | 4. REPLAT WILL BE REQUIRED THROUGH APPLICATION WITH | | | DEVELOPMENT SERVICES. | | | 5. LABEL FOUND OR SET CORNER AT P.C. OF CURVE ON PARKER | | | AVE. | | | 6. ALLEY WILL NEED TO BE REPAVED. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
5 |
Status |
P |
Date |
10-30-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
10-30-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
10-16-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-10-30 13:16:45 | APPROVED WITH THE FOLLOWING CONDITIONS: | | | 1) PROVIDE COUNTY LETTER/APPROVAL PERTAINING THE | | | BELVEDERE DRIVEWAY LOCATION AND CONFIGURATION | | | 2) PROVIDE PALM TRAN AGREEMENT/APPROVAL PERTAINING THE | | | FUTURE BUS STOP LOCATION AND CONFIGURATION | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
4 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
3 |
Status |
F |
Date |
09-23-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
09-23-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-09-23 14:03:31 | TRAFFIC STATEMENT COMMENTS: | | | 1. REVISED TRAFFIC REPORT ADDRESSING THE FOLLOWING | | | ITEMS IS MISSING FROM LATEST SUBMISSION: | | | A. USE ITE CODE 882 MARIJUANA DISPENSARY FOR TRIP | | | GENERATION PURPOSES OR PROVIDE A JUSTIFICATION FOR | | | USING ITE CODE 880 | | | B. INSERT DAILY VOLUMES IN FIGURE 3 | | | | | | SITE PLAN COMMENTS: | | | 1. PER TPS LETTER COMMENT #1, PROVIDE COUNTY | | | LETTER/APPROVAL OF THE BELVEDERE DRIVEWAY | | | 2. PROVIDE PALM TRAN AGREEMENT/APPROVAL FOR FUTURE BUS | | | STOP LOCATION, ONCE AVAILABLE | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
2 |
Status |
F |
Date |
07-15-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
07-15-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-07-15 16:15:30 | TRAFFIC STATEMENT COMMENTS: | | | 1. USE ITE CODE 882 MARIJUANA DISPENSARY FOR TRIP | | | GENERATION PURPOSES OR PROVIDE A JUSTIFICATION FOR | | | USING ITE CODE 880 | | | 2. INSERT DAILY VOLUMES IN FIGURE 3 | | | | | | SITE PLAN COMMENTS: | | | 1. PROVIDE COUNTY DRIVEWAY LETTER/APPROVAL. NOTE: IT IS | | | NOT THE TPS LETTER | | | 2. ADA PARKING STANDARDS REQUIRE A MINIMUM OF 2 SPACES | | | WHEN TOTAL PARKING SPACES ARE BETWEEN 26 AND 50 | | | 3. PROVIDE PALM TRAN AGREEMENT/APPROVAL FOR FUTURE BUS | | | STOP LOCATION, ONCE AVAILABLE | | | 4. PROVIDE ALLEY DIMENSIONS AT PARKER AVENUE AND BY | | | DEVELOPMENT?S ACCESS DRIVEWAY | | | 5. CONSIDER WIDENING THE ALLEY AS THE DRIVEWAY ABUTTING | | | TO IT WOULD BE THE MAJOR ONE. MOREOVER, AUTOTURN | | | ANALYSIS SHOWS VERY TIGHT SERVICE VEHICLES? MANEUVERS | | | 6. DRIVEWAY ON BELVEDERE ROAD SHALL BE | | | RIGHT-IN/RIGHT-OUT. EXISTING ROAD WIDTH AND TRAFFIC | | | VOLUMES WOULD POSE SAFETY CONCERNS TO VEHICLES | | | LEFT-TURNING INTO OR OUT OF THE DEVELOPMENT | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
04-07-2020 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-04-07 17:35:06 | TRAFFIC STATEMENT COMMENTS: | | | 1. PROVIDE COUNTY TPS LETTER. | | | 2. PROVIDE A TRAFFIC STUDY SIGNED AND SEALED BY A P.E. | | | REGISTERED IN FLORIDA. | | | 3. PLEASE VERIFY THAT THE EXISTING AND PROPOSED USES | | | AND INTENSITIES ARE APPROPRIATE. | | | 4. PROVIDE INTERSECTION ANALYSIS AT PARKER | | | AVENUE/BELVEDERE ROAD. | | | | | | | | | SITE PLAN COMMENTS: | | | 5. PROVIDE COUNTY DRIVEWAY LETTER. | | | 6. SHOW CURBS CUTS AND DRIVEWAYS ON THE OPPOSITE SIDE | | | OF STREET ALONG PARKER AVENUE AND BELVEDERE ROAD. | | | 7. PROVIDE UTILITY PLAN. | | | 8. PROVIDE 40-FOOT SETBACK FROM THE CENTERLINE ON | | | PARKER AVENUE PER CITY CODE SECTION 94-305. | | | 9. INCLUDE THE REQUIRED AND PROPOSED NUMBER OF LOADING | | | AREA IN THE SITE DATA TABLE AND SITE PLAN. | | | 10. CLARIFY THE LOCATION OF GARBAGE COLLECTION. | | | 11. PROVIDE AUTOTURN PATHS FOR GARBAGE, DELIVERY AND | | | SERVICE VEHICLES. | | | 12. THE PROPOSED NUMBER OF PARKING SPACES ARE 3 TIMES | | | THE REQUIRED PARKING SPACES. ARE THEY NEEDED? | | | 13. INDICATE THE REQUIRED AND PROVIDED NUMBER OF | | | BICYCLE PARKING SPACES IN THE SITE DATA TABLE. PROVIDE | | | BICYCLE PARKING SPACES NEAR THE FRONT ENTRANCE. | | | 14. PROVIDE A 10-FOOT SIDEWALK ON THE FRONTAGE ALONG | | | PARKER AVENUE | | | 15. REALIGN THE DRIVEWAY ON BELVEDERE ROAD WITH THE | | | PARKING AISLE. PROVIDE STOP BARS AND SIGNS AT THE | | | INTERNAL INTERSECTION AS APPROPRIATE. | | | 16. COORDINATE WITH PALM TRAN TO RELOCATE THE BUS STOP | | | ON PARKER AVENUE TO THE NORTHWEST CORNER OF THE SITE, | | | PROVIDE BUS STOP EASEMENT AND CONSTRUCT A BUS SHELTER | | | IF DESIRED BY PALM TRAN AT THE APPLICANT'S EXPENSE. | | | 17. PROVIDE 20-FOOT CONCRETE-PAVED CORNER CLIP AT | | | BELVEDERE ROAD/PARKER AVENUE FOR PEDESTRIAN AND PROVIDE | | | SIDEWALK AND UTILITY EASEMENT. | | | 18. SHOW THE 20-FOOT VISIBILITY TRIANGLE. VERIFY THAT | | | THE 30-INCH SCREEN WALL DOES NOT BLOCK SIGHT DISTANCE. | | | 19. PROVIDE 20-FOOT PAVED ALLEY. PROVIDE STOP BAR AND | | | SIGN AT THE ALLEY EXIT TO PARKER AVENUE. | | | | | | | | | VALERIO ORICCHIO | | | [email protected] | | | 561-494-1092 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
F |
Date |
12-03-2020 |
|
|
Cont ID |
|
| Sent By |
awooten |
Date |
12-03-2020 |
Time |
09:19 |
Rev Time |
0.00 |
| Received By |
awooten |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-12-03 09:12:33 | *********************ZONING COMMENTS ON RESUBMITTAL FOR | | | THE SANCTUARY | 835 BELVEDERE ROAD | ISPR 20-14 | | | | Z20030026 ***************************** | | | | | | PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. FOR ADDITIONAL | | | RESUBMITTALS, THE APPLICANT WILL BE ACCESSED A | | | RESUBMITTAL FEE. SUCH FEE WILL BE 20% OF THE ORIGINAL | | | APPLICATION FEE ($200). THE THIRD AND FOURTH | | | RESUBMITTALS TOTAL $400.(UNSATISFIED) | | | | | | PLEASE ADDRESS ALL COMMENTS THROUGH A WRITTEN RESPONSE. | | | | | | PROVIDE DOCUMENTATION FROM PALM TRAN ON EASEMENT | | | PROVISION FOR THE STOP OFF THE ALLEY ON PARKER NEAR THE | | | NORTHWESTERN CORNER OF THE PROPERTY. STAFF HAS CONCERNS | | | ABOUT VISIBILITY WITH A BUS STOP OFF AN ALLEY. IF THERE | | | IS TO BE A SHELTER, THE SHELTER WILL BE A PERMANENT | | | BLOCKAGE. (CONDITION OF CO) | | | | | | PROVIDE THE ELEVATION FOR BICYCLE RACK. (SATISFIED) | | | | | | THE 40? X 40? DEDICATION TO THE COUNTY AT THE CORNER OF | | | PARKER AND BELVEDERE WILL AFFECT THE BUILDING SETBACKS. | | | INDICATE THE NEW SETBACKS, CONSIDERING THE DEDICATION. | | | (SATISFIED) | | | | | | REPLAT REQUIRED. (CONDITION OF CO) | | | | | | ALANA WOOTEN | | | PLANNER | | | PLANNING DIVISION | | | 561-822-1449 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
09-24-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
09-24-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
09-24-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-09-24 13:55:32 | *********************ZONING COMMENTS ON 2ND RESUBMITTAL | | | FOR THE SANCTUARY | 835 BELVEDERE ROAD | ISPR 20-14 | | | | Z20030026 ***************************** | | | | | | PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. FOR ADDITIONAL | | | RESUBMITTALS, THE APPLICANT WILL BE ACCESSED A | | | RESUBMITTAL FEE. SUCH FEE WILL BE 20% OF THE ORIGINAL | | | APPLICATION FEE. | | | | | | PLEASE ADDRESS ALL COMMENTS THROUGH A WRITTEN RESPONSE. | | | | | | PROVIDE DOCUMENTATION FROM PALM TRAN ON EASEMENT | | | PROVISION FOR THE STOP OFF THE ALLEY ON PARKER NEAR THE | | | NORTHWESTERN CORNER OF THE PROPERTY. STAFF HAS CONCERNS | | | ABOUT VISIBILITY WITH A BUS STOP OFF AN ALLEY. IF THERE | | | IS TO BE A SHELTER, THE SHELTER WILL BE A PERMANENT | | | BLOCKAGE. (ACKNOWLEDGED, PENDING) | | | | | | PROVIDE THE ELEVATION FOR BICYCLE RACK. (UNSATISFIED) | | | | | | CONSIDER CHANGING THE ORIENTATION OF THE RACKS TO EAST | | | TO WEST FOR AN EASIER TRANSITION INTO RACK. (SATISFIED) | | | | | | PROVIDE THE DETAIL OF THE BIKE PAD WITH DIMENSIONS. | | | (SATISFIED) | | | | | | THE 40? X 40? DEDICATION TO THE COUNTY AT THE CORNER OF | | | PARKER AND BELVEDERE WILL AFFECT THE BUILDING SETBACKS. | | | INDICATE THE NEW SETBACKS, CONSIDERING THE DEDICATION. | | | (NEW COMMENT) | | | | | | REPLAT REQUIRED AS A CONDITION OF CO. (ACKNOWLEDGED, | | | PENDING) | | | | | | ALANA WOOTEN | | | PLANNER | | | PLANNING DIVISION | | | 561-822-1449 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
07-27-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
07-27-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
07-27-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-07-27 13:15:33 | *********************ZONING COMMENTS ON 1ST RESUBMITTAL | | | FOR THE SANCTUARY | 835 BELVEDERE ROAD | ISPR 20-14 | | | | Z20030026 ***************************** | | | | | | | | | PROVIDE DOCUMENTATION FROM PALM TRAN ON EASEMENT | | | PROVISION FOR THE STOP OFF OF THE ALLEY ON PARKER NEAR | | | THE NORTHWESTERN CORNER OF THE PROPERTY. STAFF HAS | | | CONCERNS ABOUT VISIBILITY WITH A BUS STOP OFF OF AN | | | ALLEY. IF THERE IS TO BE A SHELTER, THE SHELTER WILL BE | | | A PERMANENT BLOCKAGE. | | | | | | PROVIDE THE ELEVATION FOR BICYCLE RACK. | | | | | | CONSIDER CHANGING THE ORIENTATION OF THE RACKS TO EAST | | | TO WEST FOR AN EASIER TRANSITION INTO RACK. | | | | | | PROVIDE THE DETAIL OF THE BIKE PAD WITH DIMENSIONS. | | | | | | ALANA WOOTEN | | | PLANNER | | | PLANNING DIVISION | | | 561-822-1449 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-04-08 11:39:08 | PPRC ZONING COMMENTS - 835 BELVEDERE ROAD - THE | | | SANCTUARY - ISPR 20-14 | | | | | | THE REQUIRED SETBACK ON PARKER IS 40 FEET. (SEC. 94-305 | | | TABLE X-1) | | | | | | PROVIDE A DUMPSTER ENCLOSURE DETAIL AND LOCATION IN | | | SITE PLAN. | | | | | | THERE IS A PALM TRAN STOP ON THE NORTHERN PART OF THE | | | ALLEY NEAR PARKER. IS IT BEING RELOCATED? | | | | | | STAFF SUGGESTS MOVING THE BIKE RACK CLOSER TO THE | | | ENTRANCE. | | | | | | STAFF SUGGESTS REMOVING THE WHEEL STOPS AND USING CURBS | | | FOR PARKING SPACES ADJACENT TO THE BUILDING, AGAINST | | | THE SIDEWALK TO PROVIDING FOR MORE PERVIOUS LANDSCAPE | | | AREA AND POSSIBLY EXTENDING THE SIDEWALK. | | | | | | ALL SIGNAGE REQUIRES A SEPARATE PERMIT. (SEC. 94-408. - | | | SIGNS PERMITTED IN COMMERCIAL, INDUSTRIAL, COMMUNITY | | | SERVICE, RECREATION AND OPEN SPACE AND CONSERVATION | | | DISTRICTS.) | | | | | | ALANA WOOTEN | | | PLANNER | | | PLANNING DIVISION | | | 561-822-1449 | | | [email protected] | | | |
|
|
| |
Print |
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |