Plan Review Details - Project Z20030016
| Plan Review Stops For Project Z20030016 |
| Review Stop |
AIPP |
ART IN PUBLIC PLACES |
| Rev No |
1 |
Status |
P |
Date |
02-17-2021 |
|
|
Cont ID |
|
| Sent By |
scwelter |
Date |
01-29-2021 |
Time |
14:43 |
Rev Time |
0.00 |
| Received By |
rthermid |
Date |
02-17-2021 |
Time |
10:24 |
Sent To |
|
|
| Notes |
| 2021-02-17 10:29:39 | DEVELOPER SUBMITTED A COMPLETED ART ASSESSMENT | | | APPLICATION ON 02.10.2021 OPTION 2 - PUBLIC ART ACCOUNT | | | | | | 02.17.2021 EMAIL SENT - ART ASSESSMENT DUE WHEN | | | SUBMITTING BUILDING APPLICATION. | | | | | 2021-01-29 14:45:08 | PUBLIC ART 1% PROGRAM - BY ORDINANCE ALL PRIVATE | | | DEVELOPMENT PROJECTS, INCLUDING NEW CONSTRUCTION, OR | | | THE RENOVATION OR IMPROVEMENT OF AN EXISTING BUILDING, | | | WHERE TOTAL CONSTRUCTION COSTS ARE EQUAL TO OR GREATER | | | THAN $500,000 ARE SUBJECT TO THE ART ASSESSMENT. ALL | | | BUILDINGS WITHIN NEW PLANNED DEVELOPMENTS SHALL BE | | | ASSESSED CUMULATIVELY TOWARDS THIS PUBLIC ART | | | REQUIREMENT, EVEN IF THE BUILDINGS ARE PERMITTED | | | SEPARATELY OR DEVELOPED IN PHASES. OPTION 1: INSTALL | | | AND ARTWORK ON THE DEVELOPMENT SITE VALUED IN AN AMOUNT | | | NOT LESS THAN ONE PERCENT OF THE TOTAL CONSTRUCTION | | | COSTS; OR OPTION 2: CONTRIBUTE AN AMOUNT EQUAL TO 75 | | | PERCENT (-25%) OF ONE PERCENT OF THE TOTAL CONSTRUCTION | | | COSTS FOR DEPOSIT TO THE PUBLIC ART ACCOUNT. | | | THIS DEVELOPMENT IS SUBJECT TO THE ART ASSESSMENT. | | | PLEASE EMAIL SYBILLE WELTER [email protected] | | | | | | SUBJECT LINE: ART ASSESSMENT APPLICATION - WITH YOUR | | | PROJECT NUMBER | | | FAILED UNTIL ART ASSESSMENT COMPLETED, SIGNED AND | | | RETURNED, CALL 561.822.1521 WITH FURTHER QUESTIONS. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
02-10-2021 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
02-10-2021 |
Time |
20:13 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
02-10-2021 |
Time |
20:13 |
Sent To |
|
|
| Notes |
| 2021-02-10 20:13:31 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. DEMOLITION OF THE EXISTING BUILDING. AN ASBESTOS | | | SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT | | | REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH | | | COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963, | | | OR BY EMAIL: [email protected] | | | | | | 3. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 4. GREASE INTERCEPTOR. GREASE INTERCEPTORS WILL BE | | | REQUIRED. FOR INFORMATION ON THE REQUIRED TYPE, SIZE | | | AND LOCATION, PLEASE CONTACT TIM LARGE, CHIEF PLUMBING | | | INSPECTOR, DEVELOPMENT SERVICES DEPARTMENT, AT (561) | | | 805-6692, OR BY EMAIL: [email protected] | | | | | | 5. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, GAS SYSTEMS, GENERATORS, FIRE ALARM SYSTEMS, | | | FIRE SPRINKLER AND OTHER FIRE SUPPRESSION SYSTEMS, | | | GREASE INTERCEPTORS, SITE LIGHTING, SITE LANDSCAPE, | | | SITE IRRIGATION, ETC. | | | | | | 6. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER | | | AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY, | | | INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE | | | CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF | | | NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION | | | THAT MAY AFFECT THE USE OF THEIR PROPERTY. | | | | | | 7. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT | | | WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL | | | HAVE A SEPARATE ADDRESS. FOR STREET ADDRESSING, CONTACT | | | CAROLINE PUELL, ADDRESSING COORDINATOR, AT (561) 805 | | | 6659, OR BY EMAIL: [email protected] | | | | | | 8. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT | | | TO ART IN PUBLIC PLACES (AIPP) ASSESSMENT. FOR ADVICE | | | ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP | | | ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC | | | PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL: | | | [email protected] | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
10-07-2020 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
10-07-2020 |
Time |
18:36 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
10-07-2020 |
Time |
18:36 |
Sent To |
|
|
| Notes |
| 2020-10-07 18:38:16 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. DEMOLITION OF THE EXISTING BUILDING. AN ASBESTOS | | | SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT | | | REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH | | | COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963, | | | OR BY EMAIL: [email protected] | | | | | | 3. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 4. GREASE INTERCEPTOR. GREASE INTERCEPTORS WILL BE | | | REQUIRED. FOR INFORMATION ON THE REQUIRED TYPE, SIZE | | | AND LOCATION, PLEASE CONTACT TIM LARGE, CHIEF PLUMBING | | | INSPECTOR, DEVELOPMENT SERVICES DEPARTMENT, AT (561) | | | 805-6692, OR BY EMAIL: [email protected] | | | | | | 5. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, GAS SYSTEMS, GENERATORS, FIRE ALARM SYSTEMS, | | | FIRE SPRINKLER AND OTHER FIRE SUPPRESSION SYSTEMS, | | | GREASE INTERCEPTORS, SITE LIGHTING, SITE LANDSCAPE, | | | SITE IRRIGATION, ETC. | | | | | | 6. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER | | | AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY, | | | INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE | | | CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF | | | NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION | | | THAT MAY AFFECT THE USE OF THEIR PROPERTY. | | | | | | 7. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT | | | WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL | | | HAVE A SEPARATE ADDRESS. FOR STREET ADDRESSING, CONTACT | | | CAROLINE PUELL, ADDRESSING COORDINATOR, AT (561) 805 | | | 6659, OR BY EMAIL: [email protected] | | | | | | 8. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT | | | TO ART IN PUBLIC PLACES (AIPP) ASSESSMENT. FOR ADVICE | | | ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP | | | ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC | | | PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL: | | | [email protected] | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
04-08-2020 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
04-08-2020 |
Time |
20:28 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
04-08-2020 |
Time |
20:28 |
Sent To |
|
|
| Notes |
| 2020-04-08 20:43:54 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. DEMOLITION OF THE EXISTING BUILDING. AN ASBESTOS | | | SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT | | | REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH | | | COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963, | | | OR BY EMAIL: [email protected] | | | | | | 3. ACCESSIBLE ROUTE FROM PUBLIC WAY. THERE DOES NOT | | | APPEAR TO BE ANY PEDESTRUAN ACCESS SHOWN FOR WHEELCHAIR | | | USERS TO ACCESS THE RETAIL OR RESTAURANT BUILDINGS FROM | | | THE PALM BEACH LAKES BLVD SIDEWALK. SITE PLAN C-05 AND | | | LANDSCAPE PLAN L-03 DO NOT SHOW ANY PROVISION FOR THAT | | | ACCESS. WHEN SUBMITTED FOR PERMIT, THE PLANS SHALL SHOW | | | AT LEAST ONE ACCESSIBLE ROUTE, COMPLYING WITH SECTIONS | | | 206.2 AND 402.2 OF FLORIDA ACCESSIBILITY CODE, FROM THE | | | PUBLIC RIGHT-OF-WAY TO ALL ACCESSIBLE BUILDING OR | | | FACILITY ENTRANCES. | | | | | | 4. ACCESSIBLE ROUTE BETWEEN BUILDINGS. SITE PLAN C-05 | | | AND LANDSCAPE PLAN L-03 DO NOT SHOW ANY PROVISION FOR | | | PEDESTRIAN/WHEELCHAIR ACCESS BETWEEN THE BUILDINGS. | | | SHOW AT LEAST ONE ACCESSIBLE ROUTE, COMPLYING WITH | | | SECTIONS 206.2 AND 402.2 OF FLORIDA ACCESSIBILITY CODE, | | | CONNECTING ACCESSIBLE BUILDING OR FACILITY ENTRANCES | | | WITH ALL ACCESSIBLE SPACES AND ELEMENTS WITHIN THE | | | BUILDING OR FACILITY. | | | | | | 5. LOCATION OF ACCESSIBLE PARKING SPACES. SITE PLAN | | | C-05 SHOWS REGULAR PARKING SPACES THAT ARE LOCATED | | | CLOSER TO THE ENTRANCE DOORS FOR THE RETAIL BUILDING A | | | AND FAST FOOD RESTAURANT BUILDING B THAN THE ACCESSIBLE | | | PARKING SPACES. FOR EXAMPLE, THERE SHOULD BE AN | | | ACCESSIBLE PARKING SPACE LOCATED ON THE SOUTH SIDE OF | | | FAST FOOD RESTAURANT BUILDING B, BUT THERE ARE REGULAR | | | PARKING SPACES THERE INSTEAD AND THE USERS OF THE | | | ACCESSIBLE PARKING SPACES HAVE TO CROSS THE DRIVE LANE | | | TO GET TO THE RESTAURANT BUILDING. PER SECTION 208.3 OF | | | FLORIDA ACCESSIBILITY CODE, ACCESSIBLE PARKING SPACES | | | ARE TO BE LOCATED ON THE SHORTEST POSSIBLE ROUTE OF | | | TRAVEL FROM ADJACENT PARKING TO AN ACCESSIBLE ENTRANCE. | | | THE DESIGN OF ACCESSIBLE PARKING SPACES SHALL COMPLY | | | WITH SECTION 502 OF FLORIDA ACCESSIBILITY CODE | | | | | | 6. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 7. GREASE INTERCEPTOR. GREASE INTERCEPTORS WILL BE | | | REQUIRED. FOR INFORMATION ON THE REQUIRED TYPE, SIZE | | | AND LOCATION, PLEASE CONTACT TIM LARGE, CHIEF PLUMBING | | | INSPECTOR, DEVELOPMENT SERVICES DEPARTMENT, AT (561) | | | 805-6692, OR BY EMAIL: [email protected] | | | | | | 8. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, GAS SYSTEMS, GENERATORS, FIRE ALARM SYSTEMS, | | | FIRE SPRINKLER AND OTHER FIRE SUPPRESSION SYSTEMS, | | | GREASE INTERCEPTORS, SITE LIGHTING, SITE LANDSCAPE, | | | SITE IRRIGATION, ETC. | | | | | | 9. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER | | | AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY, | | | INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE | | | CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF | | | NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION | | | THAT MAY AFFECT THE USE OF THEIR PROPERTY. | | | | | | 10. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT | | | WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL | | | HAVE A SEPARATE ADDRESS. FOR STREET ADDRESSING, CONTACT | | | CAROLINE PUELL, ADDRESSING COORDINATOR, AT (561) 805 | | | 6659, OR BY EMAIL: [email protected] | | | | | | 11. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT | | | TO ART IN PUBLIC PLACES (AIPP) ASSESSMENT. FOR ADVICE | | | ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP | | | ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC | | | PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL: | | | [email protected] | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
|
Date |
03-31-2020 |
|
|
Cont ID |
|
| Sent By |
cdglass |
Date |
03-31-2020 |
Time |
13:48 |
Rev Time |
|
| Received By |
mgonzale |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-04-08 15:06:05 | PROVIDE A SANITARY SEWER HYDRAULIC MODEL WITH PROPOSED | | | FLOWS, FM VELOCITIES, AND GPD PEAK FLOWS. | | | | | | [email protected] | | | (561) 818-1322 | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
5 |
Status |
P |
Date |
02-04-2021 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
02-04-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
02-04-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-02-04 11:35:11 | 1. CONFIRM THAT A COMPLETED LOS ANALYSIS SUMMARY TABLE | | | HAS BEEN SUBMITTED DIRECTLY TO ENGINEERING (SHEET 33 OF | | | CITY OF WPB DEVELOPMENT APPLICATION). | | | 2. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY | | | SEWER ARE REQUIRED. | | | 3. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND | | | IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED | | | AREAS. | | | 4. FOR FORMAL ENGINEERING SUBMITTAL , CUT AND CAP | | | UTILITIES NOT IN USE, AND REMOVE ANY ABANDONED UTILITY | | | LINES LARGER THAN 2 INCHES FROM CITY RIGHT OF WAY. | | | 5. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE CALLOUT | | | DOMESTIC BACKFLOW PREVENTER AS RPPA AND FIRE BACKFLOW | | | PREVENTER AS DCDA. SPECIFY LEAD FREE DESIGN ON ALL | | | BACKFLOWS. | | | 6. FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND | | | NPDES NOI REQUIREMENTS WILL BE ENFORCED. | | | - AN NOI IS REQUIRED FOR PROJECTS THAT: | | | - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS | | | THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF | | | DEVELOPMENT OR SALE; | | | - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE | | | STATE OR TO SURFACE WATERS OF THE STATE THROUGH A | | | MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4). | | | - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF | | | CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION | | | THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL | | | SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT | | | OF THE 10-2 CERTIFICATION. | | | 7. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES | | | OF WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS. | | | 8. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING | | | APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT | | | SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING | | | SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED | | | LEAD-FREE DESIGN. | | | 9. FOR FORMAL ENGINEERING SUBMITTAL CLEARLY SHOW ROAD | | | RIGHT OF WAY. | | | 10. FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY LINES | | | ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY | | | LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT | | | PARCELS. | | | 11. FOR FORMAL ENGINEERING SUBMITTAL, IF WATER LINES | | | ARE BEING REPLACED IN ROW, SHOW ADJACENT PARCEL | | | ADDRESSES. | | | 12. FOR FORMAL ENGINEERING SUBMITTAL, WHEN TRENCHING IN | | | IN CITY MAINTAINED ROADWAY AREAS ADD NOTE TO PROVIDE 50 | | | FT. PAVEMENT RESTORATION TRANSITION ON EACH SIDE OF | | | PROPOSED TRENCH PER CITY OF WPB STANDARD DETAIL GC-4 | | | AND 8. | | | 13. PLEASE RESPOND TO ALL COMMENTS IN WRITING AND | | | INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER | | | (Z-XXXXXXXX). | | | | | | | | | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD | | | CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES, | | | PLEASE CONTACT 561-494-2262 OR [email protected]: | | | | | | -PLEASE VERIFY BUILDINGS WILL HAVE NO FIRE SPRINKLERS. | | | -PLEASE ADD ARROWS ON FM & S.S. MAIN SHOWING DIRECTION | | | OF FLOW ON UTILITY PLAN. | | | -FOR FORMAL ENGINEERING SUBMITTAL: ADD RP TO UTILITY | | | PLAN LABELS FOR BACKFLOW ASSEMBLIES, LABEL WATER | | | SERVICE PIPE SIZE AND MATERIAL TYPE IN DETAILS A & B & | | | C, AND ADD INFORMATION FOR CROSSING OF 6INCH CAS WM & | | | 8INCH PVC S.S. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES | | | DEPARTMENT | | | DIRECT: (561) 494-1098 [email protected] | | | | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
4 |
Status |
F |
Date |
09-21-2020 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
09-21-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
09-21-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-09-21 09:38:08 | 1. PROVIDE VERTICAL DATUM AND DATUM CONVERSION | | | INFORMATION (NAVD 1988 AND NGVD 1929) ON ALL CIVIL PLAN | | | SHEETS. | | | 2. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND | | | PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM | | | AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE | | | PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER. | | | (UNABLE TO LOCATE ON RESUBMITTAL). | | | 3. PROVIDE CCTV VIDEO OF EXISTING SANITARY FROM CITY | | | SSMH1336 (POINT OF PROPOSED SANITARY CONNECTION TO CITY | | | FACILITIES, THEN GOING EAST APPROX. 90 FT. TO NEXT CITY | | | SSMH3098). ; REQUIREMENT OF SITE PLAN APPROVAL. | | | 4. PER DISCUSSIONS WITH PUBLIC UTILITIES, PLEASE EXTEND | | | EXISTING GRAVITY SANITARY SYSTEM 75 FT. WEST TO A NEW | | | SANITARY MANHOLE, THEN SOUTH TO A NEW A SECOND SANITARY | | | MANHOLE ON SITE IN DRIVEWAY NEAR THE NORTHEAST CORNER | | | OF THE PROPERTY. YOUR PRIVATE ONSITE FORCEMAIN WILL | | | CONVEY SEWER TO THE SECOND MANHOLE (CITY?S POINT OF | | | SERVICE). A MARKUP AERIAL VIEW OF THE PROPOSED LAYOUT | | | IS AVAILABLE. | | | 5. PLEASE RESPOND TO ALL COMMENTS IN WRITING. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | RICK ROSSANO, PROJECT COORDINATOR, CITY OF WPB | | | ENGINEERING SERVICES (561) 494-1098 [email protected] | | | | | | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD | | | CUSTOMER SERVICE SUPERVISOR | | | CITY OF WEST PALM BEACH PUBLIC UTILITIES, 561-822-2262 | | | [email protected] | | | | | | -NEED UTILITY EASEMENTS FOR THE WATER METERS AND | | | SERVICE LINES ON PRIVATE PROPERTY. BACKFLOW ASSEMBLIES | | | SHOULD BE OUT OF THE UTILITY EASEMENTS. | | | -ALL CONTAINMENT BACKFLOW ASSEMBLIES FOR THIS PROPERTY | | | NEED BE RP TYPE. | | | -ON FORMAL ENGINEERING SUBMITTAL LABEL WATER SERVICE | | | LINE PIPING WITH SIZE AND MATERIAL TYPE. | | | -UTILITY PLAN SHOWS EXISTING METERED WATER SERVICE WITH | | | NO LABEL AND NOTE 2 SAYS EXISTING UTILITIES ARE TO BE | | | REMOVED BY CONTRACTOR, BUT DEMO PLAN SAYS IT WILL | | | REMAIN. PLEASE CORRECT CONTRADICTION. | | | -REFERENCED PRESSURE PIPE STANDARD DETAILS ARE OLD | | | REVISION ? PLEASE UPDATE TO NEWEST REVISION. | | | -NEW WATER LINE TAPS MAY REQUIRE PAVEMENT RESTORATION | | | IN ACCORDANCE WITH SD P-4. | | | -WPB UTILITIES RECOMMENDS DUAL/PARALLEL BACKFLOW | | | ASSEMBLIES ON DOMESTIC/GENERAL WATER SERVICES TO | | | MINIMIZE WATER OUTAGE DURING BACKFLOW ASSEMBLY | | | MAINTENANCE. | | | -REMOVE DUAL WATER SERVICE AND FIRELINE STANDARD | | | DETAILS IF THEY WILL NOT BE USED. | | | -SOME OF THE PLANS SAY JAN2020. IS THAT THE MOST RECENT | | | REVISION DATE OR WHEN PLANS WERE CREATED? | | | -WILL THE PROPERTY NEED CITY WATER SERVICE FOR | | | IRRIGATION? | | | -BACKFLOW ASSEMBLIES NEED AT LEAST 18? CLEARANCE FROM | | | BUSHES FOR MAINTENANCE. | | | -KEEP AT LEAST 3? DISTANCE BETWEEN | | | METER-BOXES/BACKFLOW-ASSEMBLIES AND TREES. ALSO APPLY | | | ROOT BARRIERS AS NECESSARY TO PREVENT UTILITY DAMAGE. | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
3 |
Status |
F |
Date |
04-08-2020 |
|
|
Cont ID |
|
| Sent By |
mgonzale |
Date |
04-08-2020 |
Time |
|
Rev Time |
1.00 |
| Received By |
rrossano |
Date |
04-08-2020 |
Time |
|
Sent To |
I |
|
| Notes |
| 2020-04-09 10:55:58 | PROVIDE A SANITARY SEWER HYDRAULIC MODEL WITH PROPOSED | | | FLOWS, FM VELOCITIES AND GPD PEAK FLOWS. | | | | | | MANNY GONZALEZ | | | SENIOR ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 644-7301 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | CENTRAL OPERATIONS CENTER (DISPATCH): | | | 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC | | | UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210 | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
F |
Date |
04-08-2020 |
|
|
Cont ID |
|
| Sent By |
Mgonzale |
Date |
04-08-2020 |
Time |
|
Rev Time |
1.00 |
| Received By |
|
Date |
04-08-2020 |
Time |
|
Sent To |
I |
|
| Notes |
| 2020-04-08 14:56:04 | ADDITIONAL COMMENTS FROM ENGINEERING: | | | | | | #1 THE CITY OF WPB DOES NOT ALLOW FLOOR DRAINS IN OPEN | | | DUMPSTER. | | | | | | [email protected] |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
04-07-2020 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
04-07-2020 |
Time |
|
Rev Time |
|
| Received By |
rrossano |
Date |
04-07-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-04-07 13:49:39 | 1. PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY | | | OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC | | | RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF | | | YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE | | | MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL | | | IN THE WPB ENGINEERING SERVICES DEPARTMENT AT | | | [email protected] OR 561-494-1079 FOR FURTHER | | | ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION | | | ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD | | | SURVEY, POT-HOLING, SOFT DIGS ETC. | | | 2. AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH | | | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, | | | STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR | | | MORE INFORMATION, REFER TO THE LINK BELOW: | | | HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI | | | CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL | | | 3. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS | | | OF ALL WATER, STORM WATER, AND SANITARY AND SEWER | | | LINES, INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER | | | AND SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES, | | | METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE | | | SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING | | | GRADES, PIPES SIZES, MATERIALS, ELEVATIONS, | | | ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL | | | INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER | | | LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE | | | PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN | | | VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. | | | ADDITIONALLY, PLAN VIEW SHALL SHOW ALL EXISTING AND | | | PROPOSED UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER | | | OPTIC, ELECTRIC, GAS, AND CABLEVISION & | | | TELECOMMUNICATION FACILITIES LOCATED ON THE | | | RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL | | | UTILITY CROSSINGS. CUT AND CAP UTILITIES NOT IN USE, | | | AND REMOVE ANY ABANDONED UTILITY LINES LARGER THAN 2 | | | INCHES FROM CITY RIGHT OF WAY. | | | 4. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE | | | DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB | | | DEVELOPMENT APPLICATION). | | | 5. SHOW DIMENSIONS OF PROPOSED DUMPSTER ENCLOSURE PER | | | CURRENT CITY OF WPB STANDARD DETAIL GC-8. | | | 6. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY | | | SEWER ARE REQUIRED. | | | 7. PLEASE CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA | | | AND FIRE BACKFLOW PREVENTER AS DCDA. | | | 8. PROVIDE VERTICAL DATUM AND DATUM CONVERSION | | | INFORMATION (NAVD 1988 AND NGVD 1929). | | | 9. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND | | | PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM | | | AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE | | | PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER. | | | 10. PROVIDE CCTV VIDEO OF EXISTING SANITARY AND STORM | | | SEWER ALONG ENTIRE PROJECT FRONTAGE. | | | 11. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | EASEMENT FOR PLACEMENT OF PROPOSED WATER METERS. | | | 12. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER | | | METER AND BACKFLOW PREVENTION. | | | 13. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES | | | OF WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS. | | | 14. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING | | | APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT | | | SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING | | | SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED | | | LEAD-FREE DESIGN. | | | 15. FOR FORMAL ENGINEERING SUBMITTAL CLEARLY SHOW ROAD | | | RIGHT OF WAY. | | | 16. FOR FORMAL ENGINEERING SUBMITTAL PROVIDE SANITARY | | | ELEVATIONS AT MANHOLE TIE-IN. | | | 17. FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY MAINS | | | ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY | | | LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT | | | PARCELS. | | | 18. FOR FORMAL ENGINEERING SUBMITTAL, IF WATER MAINS | | | ARE BEING REPLACED IN ROW, SHOW ADJACENT PARCEL | | | ADDRESSES. | | | 19. FOR FORMAL ENGINEERING SUBMITTAL, ADD NOTE TO | | | PROVIDE 50 FT. PAVEMENT RESTORATION TRANSITION ON EACH | | | SIDE OF PROPOSED TRENCH IN CITY MAINTAINED ROADWAY | | | AREAS PER CITY OF WPB STANDARD DETAIL GC-9. | | | 20. PLEASE NOTE THAT A PRE-PPRC-SUBMITTAL MEETING WITH | | | ENGINEERING SERVICES IS HIGHLY SUGGESTED. | | | 21. PLEASE REMOVE DRAINS BENEATH PROPOSED DUMPSTERS. | | | 22. PLEASE RESPOND TO ALL COMMENTS IN WRITING. | | | | | | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD | | | CUSTOMER SERVICE SUPERVISOR | | | CITY OF WEST PALM BEACH PUBLIC UTILITIES, 561-822-2262 | | | [email protected] | | | | | | -CANNOT USE BRANCHED WATER SERVICE FOR THE RESTAURANTS | | | ? THOSE WILL NEED SEPARATE 1 IN. TAPS. | | | -HOW WILL THE WATER SERVICE RUNNING TO THE LIFT STATION | | | BE USED? WILL THERE JUST BE A HOSE BIB OR WILL THERE BE | | | OTHER PLUMBING? | | | -NEED UTILITY EASEMENTS FOR THE WATER METERS IF THEY | | | WILL BE ON PRIVATE PROPERTY. | | | -NEED TO SHOW EXISTING WATER SERVICE AND LABEL WHAT | | | WILL HAPPEN TO IT. | | | -PROPOSED FORCE MAIN SHOULD NOT CUT THROUGH EAST | | | NEIGHBOR?S PROPERTY. | | | | | | PROVIDE A SANITARY SEWER HYDRAULIC MODEL WITH PROPOSED | | | FLOWS, FM VELOCITIES AND GPD PEAK FLOWS. | | | | | | MANNY GONZALEZ | | | SENIOR ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 644-7301 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | CENTRAL OPERATIONS CENTER (DISPATCH): | | | 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC | | | UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210 | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | | | | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES | | | DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR, WEST PALM BEACH, FL | | | 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | DIRECT: (561) 494-1098 | | | MOBILE: (561) 246-9525 | | | FAX: (561) 494-1116 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
4 |
Status |
P |
Date |
02-05-2021 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
02-05-2021 |
Time |
12:11 |
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
02-05-2021 |
Time |
12:10 |
Sent To |
|
|
| Notes |
| 2021-02-05 12:12:13 | FIRE HAS NO OBJECTIONS AND APPROVES THE PROPOSED | | | PROJECT. | | | | | | THE PREVIOUS ORIGINAL COMMENTS ARE BEING RE-POSTED FOR | | | INFORMATIONAL BUILDING PALNS SUBMITTAL PURPOSES. | | | | | | ******************************************************* | | | ******************************************************* | | | ********* | | | | | | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE | | | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. | | | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS | | | ARE SUBMITTED FOR PERMIT. | | | | | | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE | | | PROPOSED PROJECT. | | | | | | 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY | | | WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE | | | PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A | | | PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED | | | TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN | | | STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY | | | MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER | | | PROTECTION. | | | | | | 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY | | | IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING | | | ALL CONSTRUCTION ACTIVITIES. | | | | | | 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM | | | ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION. | | | ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND | | | AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT | | | WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS. | | | | | | 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE | | | REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE | | | ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS. | | | | | | 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH | | | THE 6TH EDITION OF THE FLORIDA FIRE PREVENTION CODE, | | | INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES. | | | | | | 6. FOR PLAN REVIEW SUBMITTAL, PLEASE INCLUDE THE | | | OCCUPANCY TYPE, PER THE FLORIDA FIRE PREVENTION CODE. | | | | | | 7. FOR PLAN REVIEW SUBMITTAL, PLEASE ENSURE THAT A FIRE | | | LOAD CALCULATION IS INCLUDED AND THAT ADEQUATE WATER | | | SUPPLY IS EXISTING OR WILL BE PROVIDED. | | | | | | 8. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED | | | ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF | | | FIRE PREVENTION. | | | | | | THE INDICATED LOCATIONS OF THE FIRE HYDRANTS ARE | | | ACCEPTABLE WITH ANY CHANGES CLOSELY COORDINATED WITH | | | THE BUREAU OF FIRE PREVENTION. | | | | | | 9. PROVIDE FOR A FIRE SPRINKLER AND/OR FIRE ALARM PER | | | THE APPLICABLE OCCUPANCY CODE. FOR ANY LIFE SAFETY | | | ENGINEERED SYSTEM, I.E FIRE SPRINKLER AND FIRE ALARM, | | | ENSURE THEY COMPLY WITH THE REQUIREMENTS OF FS 61G AND | | | SUBMITTED WITH THE MASTER PERMIT. | | | | | | 9A) THE LOCATION OF ANY APPLICABLE DDCV AND FIRE LINE | | | LOCATIONS SHALL MEET THE REQUIREMENTS OF NFPA 24 AND | | | SHALL BE COORDINATED WITH THE OFFICE OF FIRE MARSHAL, | | | THE CITY'S ENGINEERS OFFICE, THE LANDSCAPE PLANNER, AND | | | THE CITY'S PLANNING AND ZONING OFFICE. | | | | | | 10. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL | | | BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL | | | DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS, | | | EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A | | | PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE | | | SAFETY FEATURES AND EQUIPMENT. | | | | | | 11. IT IS HIGHLY RECOMMENDED (REQUIRED WITH FIRE | | | SPRINKLER SYSTEM) THAT A KNOX BOX WITH KEYS FOR ENTRY | | | DOOR LOCKS BE PROVIDED FOR 24 HOUR EMERGENCY ACCESS. | | | | | | 12. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT | | | DOES NOT CONSTITUTE ITS FINAL REVIEW OR APPROVAL. | | | | | | 13. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING | | | PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH | | | THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
10-05-2020 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
10-05-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
10-05-2020 |
Time |
16:05 |
Sent To |
|
|
| Notes |
| 2020-10-05 16:08:02 | FIRE HAS NO OBJECTION TO THE PROPOSED AS ALL PREVIOUS | | | COMMENTS HAVE BEEN ADDRESSED. | | | | | | FIRE SHALL REVIEW ANY BUILDING PLAN SUBMITTALS UNDER | | | THE CURRENT APPLICABLE LIFE AND FIRE SAFETY CODES. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
09-10-2020 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
09-10-2020 |
Time |
14:56 |
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
09-10-2020 |
Time |
14:56 |
Sent To |
|
|
| Notes |
| 2020-09-10 14:58:30 | 2ND REVIEW RESPONSE | | | | | | AFTER A REVIEW OF THE PPRC INFORMATION PACKET AND | | | RESPONSE LETTER DATED AUGUST 6, 2020, FROM THOMAS | | | ENGINEERING GROUP, THE PREVIOUSLY SUBMITTED FIRE | | | PREVENTION BUREAU COMMENTS HAVE BEEN ADDRESSED. | | | | | | THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT DOES | | | NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT | | | THE APPROPRIATE TIME AND IN ACCORDANCE WITH THE | | | REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | WEST PALM BEACH FIRE DEPARTMENT | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
03-30-2020 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
03-30-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
03-30-2020 |
Time |
15:13 |
Sent To |
|
|
| Notes |
| 2020-03-30 15:15:10 | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, | | | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM | | | BEACH FIRE RESCUE. | | | | | | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE | | | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. | | | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS | | | ARE SUBMITTED FOR PERMIT. | | | | | | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE | | | PROPOSED PROJECT. | | | | | | 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY | | | WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE | | | PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A | | | PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED | | | TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN | | | STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY | | | MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER | | | PROTECTION. | | | | | | 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY | | | IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING | | | ALL CONSTRUCTION ACTIVITIES. | | | | | | 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM | | | ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION. | | | ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND | | | AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT | | | WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS. | | | | | | 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE | | | REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE | | | ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS. | | | | | | 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH | | | THE 6TH EDITION OF THE FLORIDA FIRE PREVENTION CODE, | | | INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES. | | | | | | 6. FOR PLAN REVIEW SUBMITTAL, PLEASE INCLUDE THE | | | OCCUPANCY TYPE, PER THE FLORIDA FIRE PREVENTION CODE. | | | | | | 7. FOR PLAN REVIEW SUBMITTAL, PLEASE ENSURE THAT A FIRE | | | LOAD CALCULATION IS INCLUDED AND THAT ADEQUATE WATER | | | SUPPLY IS EXISTING OR WILL BE PROVIDED. | | | | | | 8. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED | | | ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF | | | FIRE PREVENTION. | | | | | | THE INDICATED LOCATIONS OF THE FIRE HYDRANTS ARE | | | ACCEPTABLE WITH ANY CHANGES CLOSELY COORDINATED WITH | | | THE BUREAU OF FIRE PREVENTION. | | | | | | 9. PROVIDE FOR A FIRE SPRINKLER AND/OR FIRE ALARM PER | | | THE APPLICABLE OCCUPANCY CODE. FOR ANY LIFE SAFETY | | | ENGINEERED SYSTEM, I.E FIRE SPRINKLER AND FIRE ALARM, | | | ENSURE THEY COMPLY WITH THE REQUIREMENTS OF FS 61G AND | | | SUBMITTED WITH THE MASTER PERMIT. | | | | | | 9A) THE LOCATION OF ANY APPLICABLE DDCV AND FIRE LINE | | | LOCATIONS SHALL MEET THE REQUIREMENTS OF NFPA 24 AND | | | SHALL BE COORDINATED WITH THE OFFICE OF FIRE MARSHAL, | | | THE CITY'S ENGINEERS OFFICE, THE LANDSCAPE PLANNER, AND | | | THE CITY'S PLANNING AND ZONING OFFICE. | | | | | | 10. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL | | | BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL | | | DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS, | | | EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A | | | PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE | | | SAFETY FEATURES AND EQUIPMENT. | | | | | | 11. IT IS HIGHLY RECOMMENDED (REQUIRED WITH FIRE | | | SPRINKLER SYSTEM) THAT A KNOX BOX WITH KEYS FOR ENTRY | | | DOOR LOCKS BE PROVIDED FOR 24 HOUR EMERGENCY ACCESS. | | | | | | 12. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT | | | DOES NOT CONSTITUTE ITS FINAL REVIEW OR APPROVAL. | | | | | | 13. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING | | | PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH | | | THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
4 |
Status |
P |
Date |
04-12-2021 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
04-12-2021 |
Time |
12:01 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
04-12-2021 |
Time |
11:50 |
Sent To |
|
|
| Notes |
| 2021-04-12 12:01:24 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 1225 PALM BEACH LAKES Z20030016 | | | APRIL 12, 2021 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. PROVIDE THE FOLLOWING CORRECTIONS TO TREE | | | DISPOSITION CHART: | | | ? SATISFIED. PROVIDE REASON WHY MAHOGANY #15 IN GOOD | | | CONDITION CANNOT BE RELOCATED. | | | ? SATISFIED. CORRECT NOTE AT BOTTOM OF DISPOSITION | | | CHART TO REMOVE WAWA. | | | ? SATISFIED. CORRECT SHEET L-01 TO IDENTIFY REMOVALS | | | WITH AN X AND RELOCATES WITH AN R SO THEY ARE CLEARLY | | | IDENTIFIABLE. | | | ? SATISFIED. REVISE THE PROVIDED MITIGATION AFTER THE | | | PLAN IS REVISED FOR THE COMMENTS BELOW. | | | | | | | | | 2. SATISFIED. PROVIDE THE REQUIRED TERMINAL LANDSCAPE | | | ISLAND WITH 8 FEET LANDSCAPE WIDTH AT THE END OF EACH | | | ROW OF PARKING ALONG THE WEST BUFFER. THE 5 FEET OF | | | REQUIRED LANDSCAPE BUFFER CAN BE A PART OF THE TERMINAL | | | ISLAND, BUT THE 8 FEET INSIDE CURB MUST BE PROVIDED. | | | THE REQUIRED TREE MUST BE PROVIDED IN ADDITION TO THE | | | BUFFER TREE REQUIREMENT. | | | | | | 3. SATISFIED. PROVIDE THE REQUIRED TERMINAL LANDSCAPE | | | ISLAND AND REQUIRED TREE AT THE NORTH END OF THE ROW OF | | | PARKING ON THE WEST SIDE OF BUILDING C. | | | | | | 4. SATISFIED. SHOW THAT THE SQUARE FOOTAGE OF LANDSCAPE | | | AREA ADJACENT TO THE PARKING SPACE IS AT LEAST 140 SQ | | | FT FOR THE LANDSCAPE ISLANDS THAT HAVE A MODIFIED | | | RADIUS. | | | | | | 5. SATISFIED. PROVIDE THE REQUIRED WEST LANDSCAPE | | | BUFFER AT THIS TIME IF THE PROPOSED CROSS ACCESS LANE | | | IS NOT GOING TO BE CONSTRUCTED WITH THE SITE. IF IT IS | | | TO BE A LATER DATE, PROVIDE AN ALTERNATE PLAN FOR THE | | | AREA FOR WHEN THE ACCESS WILL BE CONSTRUCTED. | | | | | | | | | 6. SATISFIED. SECTION 94-443(C)(3) REQUIRES THAT A | | | MINIMUM OF 75 PERCENT OF ALL TREES THAT ARE REQUIRED TO | | | BE PLANTED WITHIN THE INTERIOR OF AN OFF STREET PARKING | | | AREA SHALL BE CATEGORY 1 SHADE TREES. SHOW THE | | | PERCENTAGE OF CATEGORY 1 TREES PROVIDED FOR THE | | | REQUIRED LANDSCAPE AREAS AS REQUIRED BY SECTION | | | 94-443(C)(3) FOR TERMINAL AND INTERIOR ISLANDS. THERE | | | ARE 17 REQUIRED ISLANDS AND TREES, MEANING 13 MUST BE | | | CATEGORY 1. | | | | | | | | | 7. SATISFIED. THE PARKING SPACES APPEAR TO BE 18 FEET | | | IN LENGTH WITH A CURB AND OVERHANG INTO LANDSCAPE | | | AREAS. STAFF SUGGESTS REDUCING THE PAVED AREAS FOR | | | PARKING SPACES AND PLACING THE CURBS AT 16 FEET TO | | | ALLOW FOR ADDITIONAL PERVIOUS LANDSCAPE AREA AT THE | | | OVERHANG. THIS ALSO ALLOWS MORE LANDSCAPE AREA FOR | | | SUPPORTING THE ROOT ZONES OF THE TREES. | | | | | | 8. LANDSCAPE BUFFERS: | | | | | | ? SATISFIED. WEST BUFFER REQUIRES 8 TREES, IF ALEXANDER | | | PALMS ARE TRIPLE TRUNK, THEY CAN COUNT FOR 1 TREE EACH. | | | IF TREE #27 IS COUNTED TOWARD NORTH BUFFER REQUIREMENT, | | | THEN THE PLAN ONLY PROVIDES 5 BUFFER TREES. | | | OFFSITE TREES #17-23 CANNOT BE COUNTED TOWARD ONSITE | | | BUFFER REQUIREMENTS. 3 TRIPLE ALEXANDER PALMS COUNT AS | | | 3 TREES. NEED 5 MORE QUALIFYING TREES. | | | | | | 2/9/21 THERE ARE NO CREDITS FOR INCREASED TREE SIZES IN | | | THE WPB CODE. MUST PROVIDE 8 QUALIFYING TREES. 4 TRIPLE | | | PALMS AND 2 CLUSIA ARE PROVIDED, SO NEED TREES OR PALMS | | | FOR 2 MORE TREES. | | | ? SATISFIED. SOUTH BUFFER LENGTH REQUIRES 11 TREES, AND | | | PROVIDES 11 TREES. | | | ? SATISFIED. NORTH BUFFER REQUIRES 11 TREES, 11 TREES | | | PROVIDED IF #27 IS COUNTED. | | | ? SATISFIED. EAST BUFFER REQUIRES 8 TREES. FOR THE | | | VARIANCE, THE NARRATIVE STATES THERE ARE 8 ADDITIONAL | | | TREES PROVIDED ON SITE TO COMPENSATE. THESE MUST BE | | | IDENTIFIED IN SOME WAY ON THE PLAN. | | | THIS WAS NOT ADDRESSED IN THE COMMENT RESPONSES. | | | 2/9/21 COULD NOT EASILY LOCATE THE IDENTIFYING E FOR | | | THE 8 TREES. | | | | | | 9. SATISFIED. THE PROPOSED PLAN COUNTS EXISTING TREES | | | IN THE LANDSCAPE BUFFER REQUIREMENTS. THESE TREES ARE | | | IN LOCATIONS WHERE CONSTRUCTION OF PAVEMENT, CURBS AND | | | UTILITIES WILL BE IN CLOSE PROXIMITY. INSTRUCTIONS NEED | | | TO BE INCLUDED ON HOW THE CONTRACTOR IS TO HAVE A | | | QUALIFIED CERTIFIED ARBORIST AVAILABLE AS NEEDED TO | | | ASSURE THE TREE ROOT SYSTEMS ARE PROTECTED AND NOT | | | DAMAGED. | | | | | | 10. SATISFIED. PROVIDE A DETAIL AND LOCATIONS OF ROOT | | | BARRIERS TO SEPARATE LANDSCAPING FROM UTILITY LINES. | | | | | | 11. SATISFIED. SHOW THE LOCATIONS OF ALL SITE LIGHTING | | | ON THE LANDSCAPE PLAN AND REDESIGN THE LOCATIONS OF THE | | | LIGHTING ON SHORTER POLES TO RESOLVE ANY CONFLICTS WITH | | | TREES IN THE PARKING AREA LANDSCAPE ISLANDS. | | | | | | 12. SATISFIED. PER SECTION 94-452 ROADWAY | | | BEAUTIFICATION, PROVIDE A PLAN FOR THE REPLACEMENT OF | | | THE ROYAL PALMS IN THE RIGHT OF WAY, AND PROVIDE A | | | SEPARATE SECTION ON THE PLANT LIST FOR THEM. PALM BEACH | | | LAKES BOULEVARD IS PB COUNTY RIGHT OF WAY, AND THE CITY | | | HAS A LANDSCAPE MAINTENANCE AGREEMENT WITH THE COUNTY. | | | IRRIGATION MAY NOT BE WORKING IN THE RIGHT OF WAY, SO | | | IRRIGATION SHOULD BE PROVIDED FROM THE SITE. A | | | MAINTENANCE AGREEMENT SHOULD BE WORKED OUT, AS THE | | | LANDSCAPE MAINTENANCE PROVIDED BY THE CITY MAY NOT BE | | | ADEQUATE TO ENHANCE THE PROJECT. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH | | | THIS PETITION. | | | | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION PERMITTED AND INSTALLED. | | | THIS WILL BE THROUGH A SEPARATE MAINTENANCE AGREEMENT | | | WITH THE CITY TRANSFERRING THE MAINTENANCE FROM THE | | | CITY TO THE PROPERTY OWNER. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
3 |
Status |
F |
Date |
02-09-2021 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
02-09-2021 |
Time |
15:36 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
02-09-2021 |
Time |
15:36 |
Sent To |
|
|
| Notes |
| 2021-02-09 15:36:35 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 1225 PALM BEACH LAKES Z20030016 | | | FEBRUARY 9, 2021 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. PROVIDE THE FOLLOWING CORRECTIONS TO TREE | | | DISPOSITION CHART: | | | ? SATISFIED. PROVIDE REASON WHY MAHOGANY #15 IN GOOD | | | CONDITION CANNOT BE RELOCATED. | | | ? SATISFIED. CORRECT NOTE AT BOTTOM OF DISPOSITION | | | CHART TO REMOVE WAWA. | | | ? SATISFIED. CORRECT SHEET L-01 TO IDENTIFY REMOVALS | | | WITH AN X AND RELOCATES WITH AN R SO THEY ARE CLEARLY | | | IDENTIFIABLE. | | | ? SATISFIED. REVISE THE PROVIDED MITIGATION AFTER THE | | | PLAN IS REVISED FOR THE COMMENTS BELOW. | | | | | | | | | 2. SATISFIED. PROVIDE THE REQUIRED TERMINAL LANDSCAPE | | | ISLAND WITH 8 FEET LANDSCAPE WIDTH AT THE END OF EACH | | | ROW OF PARKING ALONG THE WEST BUFFER. THE 5 FEET OF | | | REQUIRED LANDSCAPE BUFFER CAN BE A PART OF THE TERMINAL | | | ISLAND, BUT THE 8 FEET INSIDE CURB MUST BE PROVIDED. | | | THE REQUIRED TREE MUST BE PROVIDED IN ADDITION TO THE | | | BUFFER TREE REQUIREMENT. | | | | | | 3. SATISFIED. PROVIDE THE REQUIRED TERMINAL LANDSCAPE | | | ISLAND AND REQUIRED TREE AT THE NORTH END OF THE ROW OF | | | PARKING ON THE WEST SIDE OF BUILDING C. | | | | | | 4. SATISFIED. SHOW THAT THE SQUARE FOOTAGE OF LANDSCAPE | | | AREA ADJACENT TO THE PARKING SPACE IS AT LEAST 140 SQ | | | FT FOR THE LANDSCAPE ISLANDS THAT HAVE A MODIFIED | | | RADIUS. | | | | | | 5. SATISFIED. PROVIDE THE REQUIRED WEST LANDSCAPE | | | BUFFER AT THIS TIME IF THE PROPOSED CROSS ACCESS LANE | | | IS NOT GOING TO BE CONSTRUCTED WITH THE SITE. IF IT IS | | | TO BE A LATER DATE, PROVIDE AN ALTERNATE PLAN FOR THE | | | AREA FOR WHEN THE ACCESS WILL BE CONSTRUCTED. | | | | | | | | | 6. SATISFIED. SECTION 94-443(C)(3) REQUIRES THAT A | | | MINIMUM OF 75 PERCENT OF ALL TREES THAT ARE REQUIRED TO | | | BE PLANTED WITHIN THE INTERIOR OF AN OFF STREET PARKING | | | AREA SHALL BE CATEGORY 1 SHADE TREES. SHOW THE | | | PERCENTAGE OF CATEGORY 1 TREES PROVIDED FOR THE | | | REQUIRED LANDSCAPE AREAS AS REQUIRED BY SECTION | | | 94-443(C)(3) FOR TERMINAL AND INTERIOR ISLANDS. THERE | | | ARE 17 REQUIRED ISLANDS AND TREES, MEANING 13 MUST BE | | | CATEGORY 1. | | | | | | | | | 7. SATISFIED. THE PARKING SPACES APPEAR TO BE 18 FEET | | | IN LENGTH WITH A CURB AND OVERHANG INTO LANDSCAPE | | | AREAS. STAFF SUGGESTS REDUCING THE PAVED AREAS FOR | | | PARKING SPACES AND PLACING THE CURBS AT 16 FEET TO | | | ALLOW FOR ADDITIONAL PERVIOUS LANDSCAPE AREA AT THE | | | OVERHANG. THIS ALSO ALLOWS MORE LANDSCAPE AREA FOR | | | SUPPORTING THE ROOT ZONES OF THE TREES. | | | | | | 8. LANDSCAPE BUFFERS: | | | | | | ? PARTIALLY SATISFIED. WEST BUFFER REQUIRES 8 TREES, IF | | | ALEXANDER PALMS ARE TRIPLE TRUNK, THEY CAN COUNT FOR 1 | | | TREE EACH. IF TREE #27 IS COUNTED TOWARD NORTH BUFFER | | | REQUIREMENT, THEN THE PLAN ONLY PROVIDES 5 BUFFER | | | TREES. | | | OFFSITE TREES #17-23 CANNOT BE COUNTED TOWARD ONSITE | | | BUFFER REQUIREMENTS. 3 TRIPLE ALEXANDER PALMS COUNT AS | | | 3 TREES. NEED 5 MORE QUALIFYING TREES. | | | | | | 2/9/21 THERE ARE NO CREDITS FOR INCREASED TREE SIZES IN | | | THE WPB CODE. MUST PROVIDE 8 QUALIFYING TREES. 4 TRIPLE | | | PALMS AND 2 CLUSIA ARE PROVIDED, SO NEED TREES OR PALMS | | | FOR 2 MORE TREES. | | | ? SATISFIED. SOUTH BUFFER LENGTH REQUIRES 11 TREES, AND | | | PROVIDES 11 TREES. | | | ? SATISFIED. NORTH BUFFER REQUIRES 11 TREES, 11 TREES | | | PROVIDED IF #27 IS COUNTED. | | | ? NOT SATISFIED. EAST BUFFER REQUIRES 8 TREES. FOR THE | | | VARIANCE, THE NARRATIVE STATES THERE ARE 8 ADDITIONAL | | | TREES PROVIDED ON SITE TO COMPENSATE. THESE MUST BE | | | IDENTIFIED IN SOME WAY ON THE PLAN. | | | THIS WAS NOT ADDRESSED IN THE COMMENT RESPONSES. | | | 2/9/21 COULD NOT EASILY LOCATE THE IDENTIFYING E FOR | | | THE 8 TREES. | | | | | | 9. SATISFIED. THE PROPOSED PLAN COUNTS EXISTING TREES | | | IN THE LANDSCAPE BUFFER REQUIREMENTS. THESE TREES ARE | | | IN LOCATIONS WHERE CONSTRUCTION OF PAVEMENT, CURBS AND | | | UTILITIES WILL BE IN CLOSE PROXIMITY. INSTRUCTIONS NEED | | | TO BE INCLUDED ON HOW THE CONTRACTOR IS TO HAVE A | | | QUALIFIED CERTIFIED ARBORIST AVAILABLE AS NEEDED TO | | | ASSURE THE TREE ROOT SYSTEMS ARE PROTECTED AND NOT | | | DAMAGED. | | | | | | 10. SATISFIED. PROVIDE A DETAIL AND LOCATIONS OF ROOT | | | BARRIERS TO SEPARATE LANDSCAPING FROM UTILITY LINES. | | | | | | 11. SATISFIED. SHOW THE LOCATIONS OF ALL SITE LIGHTING | | | ON THE LANDSCAPE PLAN AND REDESIGN THE LOCATIONS OF THE | | | LIGHTING ON SHORTER POLES TO RESOLVE ANY CONFLICTS WITH | | | TREES IN THE PARKING AREA LANDSCAPE ISLANDS. | | | | | | 12. SATISFIED. PER SECTION 94-452 ROADWAY | | | BEAUTIFICATION, PROVIDE A PLAN FOR THE REPLACEMENT OF | | | THE ROYAL PALMS IN THE RIGHT OF WAY, AND PROVIDE A | | | SEPARATE SECTION ON THE PLANT LIST FOR THEM. PALM BEACH | | | LAKES BOULEVARD IS PB COUNTY RIGHT OF WAY, AND THE CITY | | | HAS A LANDSCAPE MAINTENANCE AGREEMENT WITH THE COUNTY. | | | IRRIGATION MAY NOT BE WORKING IN THE RIGHT OF WAY, SO | | | IRRIGATION SHOULD BE PROVIDED FROM THE SITE. A | | | MAINTENANCE AGREEMENT SHOULD BE WORKED OUT, AS THE | | | LANDSCAPE MAINTENANCE PROVIDED BY THE CITY MAY NOT BE | | | ADEQUATE TO ENHANCE THE PROJECT. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH | | | THIS PETITION. | | | | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION PERMITTED AND INSTALLED. | | | THIS WILL BE THROUGH A SEPARATE MAINTENANCE AGREEMENT | | | WITH THE CITY TRANSFERRING THE MAINTENANCE FROM THE | | | CITY TO THE PROPERTY OWNER. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
F |
Date |
10-06-2020 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
10-06-2020 |
Time |
17:08 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
10-06-2020 |
Time |
17:08 |
Sent To |
|
|
| Notes |
| 2020-10-06 17:08:43 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 1225 PALM BEACH LAKES Z20030016 | | | OCTOBER 6, 2020 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. PROVIDE THE FOLLOWING CORRECTIONS TO TREE | | | DISPOSITION CHART: | | | ? SATISFIED. PROVIDE REASON WHY MAHOGANY #15 IN GOOD | | | CONDITION CANNOT BE RELOCATED. | | | ? SATISFIED. CORRECT NOTE AT BOTTOM OF DISPOSITION | | | CHART TO REMOVE WAWA. | | | ? SATISFIED. CORRECT SHEET L-01 TO IDENTIFY REMOVALS | | | WITH AN X AND RELOCATES WITH AN R SO THEY ARE CLEARLY | | | IDENTIFIABLE. | | | ? SATISFIED. REVISE THE PROVIDED MITIGATION AFTER THE | | | PLAN IS REVISED FOR THE COMMENTS BELOW. | | | | | | | | | 2. SATISFIED. PROVIDE THE REQUIRED TERMINAL LANDSCAPE | | | ISLAND WITH 8 FEET LANDSCAPE WIDTH AT THE END OF EACH | | | ROW OF PARKING ALONG THE WEST BUFFER. THE 5 FEET OF | | | REQUIRED LANDSCAPE BUFFER CAN BE A PART OF THE TERMINAL | | | ISLAND, BUT THE 8 FEET INSIDE CURB MUST BE PROVIDED. | | | THE REQUIRED TREE MUST BE PROVIDED IN ADDITION TO THE | | | BUFFER TREE REQUIREMENT. | | | | | | 3. SATISFIED. PROVIDE THE REQUIRED TERMINAL LANDSCAPE | | | ISLAND AND REQUIRED TREE AT THE NORTH END OF THE ROW OF | | | PARKING ON THE WEST SIDE OF BUILDING C. | | | | | | 4. SATISFIED. SHOW THAT THE SQUARE FOOTAGE OF LANDSCAPE | | | AREA ADJACENT TO THE PARKING SPACE IS AT LEAST 140 SQ | | | FT FOR THE LANDSCAPE ISLANDS THAT HAVE A MODIFIED | | | RADIUS. | | | | | | 5. PROVIDE THE REQUIRED WEST LANDSCAPE BUFFER AT THIS | | | TIME IF THE PROPOSED CROSS ACCESS LANE IS NOT GOING TO | | | BE CONSTRUCTED WITH THE SITE. IF IT IS TO BE A LATER | | | DATE, PROVIDE AN ALTERNATE PLAN FOR THE AREA FOR WHEN | | | THE ACCESS WILL BE CONSTRUCTED. | | | | | | | | | 6. SATISFIED. SECTION 94-443(C)(3) REQUIRES THAT A | | | MINIMUM OF 75 PERCENT OF ALL TREES THAT ARE REQUIRED TO | | | BE PLANTED WITHIN THE INTERIOR OF AN OFF STREET PARKING | | | AREA SHALL BE CATEGORY 1 SHADE TREES. SHOW THE | | | PERCENTAGE OF CATEGORY 1 TREES PROVIDED FOR THE | | | REQUIRED LANDSCAPE AREAS AS REQUIRED BY SECTION | | | 94-443(C)(3) FOR TERMINAL AND INTERIOR ISLANDS. THERE | | | ARE 17 REQUIRED ISLANDS AND TREES, MEANING 13 MUST BE | | | CATEGORY 1. | | | | | | | | | 7. SATISFIED. THE PARKING SPACES APPEAR TO BE 18 FEET | | | IN LENGTH WITH A CURB AND OVERHANG INTO LANDSCAPE | | | AREAS. STAFF SUGGESTS REDUCING THE PAVED AREAS FOR | | | PARKING SPACES AND PLACING THE CURBS AT 16 FEET TO | | | ALLOW FOR ADDITIONAL PERVIOUS LANDSCAPE AREA AT THE | | | OVERHANG. THIS ALSO ALLOWS MORE LANDSCAPE AREA FOR | | | SUPPORTING THE ROOT ZONES OF THE TREES. | | | | | | 8. LANDSCAPE BUFFERS: | | | | | | ? NOT SATISFIED. WEST BUFFER REQUIRES 8 TREES, IF | | | ALEXANDER PALMS ARE TRIPLE TRUNK, THEY CAN COUNT FOR 1 | | | TREE EACH. IF TREE #27 IS COUNTED TOWARD NORTH BUFFER | | | REQUIREMENT, THEN THE PLAN ONLY PROVIDES 5 BUFFER | | | TREES. | | | OFFSITE TREES #17-23 CANNOT BE COUNTED TOWARD ONSITE | | | BUFFER REQUIREMENTS. 3 TRIPLE ALEXANDER PALMS COUNT AS | | | 3 TREES. NEED 5 MORE QUALIFYING TREES. | | | ? SATISFIED. SOUTH BUFFER LENGTH REQUIRES 11 TREES, AND | | | PROVIDES 11 TREES. | | | ? SATISFIED. NORTH BUFFER REQUIRES 11 TREES, 11 TREES | | | PROVIDED IF #27 IS COUNTED. | | | ? NOT SATISFIED. EAST BUFFER REQUIRES 8 TREES. FOR THE | | | VARIANCE, THE NARRATIVE STATES THERE ARE 8 ADDITIONAL | | | TREES PROVIDED ON SITE TO COMPENSATE. THESE MUST BE | | | IDENTIFIED IN SOME WAY ON THE PLAN. | | | THIS WAS NOT ADDRESSED IN THE COMMENT RESPONSES. | | | | | | 9. SATISFIED. THE PROPOSED PLAN COUNTS EXISTING TREES | | | IN THE LANDSCAPE BUFFER REQUIREMENTS. THESE TREES ARE | | | IN LOCATIONS WHERE CONSTRUCTION OF PAVEMENT, CURBS AND | | | UTILITIES WILL BE IN CLOSE PROXIMITY. INSTRUCTIONS NEED | | | TO BE INCLUDED ON HOW THE CONTRACTOR IS TO HAVE A | | | QUALIFIED CERTIFIED ARBORIST AVAILABLE AS NEEDED TO | | | ASSURE THE TREE ROOT SYSTEMS ARE PROTECTED AND NOT | | | DAMAGED. | | | | | | 10. SATISFIED. PROVIDE A DETAIL AND LOCATIONS OF ROOT | | | BARRIERS TO SEPARATE LANDSCAPING FROM UTILITY LINES. | | | | | | 11. SATISFIED. SHOW THE LOCATIONS OF ALL SITE LIGHTING | | | ON THE LANDSCAPE PLAN AND REDESIGN THE LOCATIONS OF THE | | | LIGHTING ON SHORTER POLES TO RESOLVE ANY CONFLICTS WITH | | | TREES IN THE PARKING AREA LANDSCAPE ISLANDS. | | | | | | 12. SATISFIED. PER SECTION 94-452 ROADWAY | | | BEAUTIFICATION, PROVIDE A PLAN FOR THE REPLACEMENT OF | | | THE ROYAL PALMS IN THE RIGHT OF WAY, AND PROVIDE A | | | SEPARATE SECTION ON THE PLANT LIST FOR THEM. PALM BEACH | | | LAKES BOULEVARD IS PB COUNTY RIGHT OF WAY, AND THE CITY | | | HAS A LANDSCAPE MAINTENANCE AGREEMENT WITH THE COUNTY. | | | IRRIGATION MAY NOT BE WORKING IN THE RIGHT OF WAY, SO | | | IRRIGATION SHOULD BE PROVIDED FROM THE SITE. A | | | MAINTENANCE AGREEMENT SHOULD BE WORKED OUT, AS THE | | | LANDSCAPE MAINTENANCE PROVIDED BY THE CITY MAY NOT BE | | | ADEQUATE TO ENHANCE THE PROJECT. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH | | | THIS PETITION. | | | | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION PERMITTED AND INSTALLED. | | | THIS WILL BE THROUGH A SEPARATE MAINTENANCE AGREEMENT | | | WITH THE CITY TRANSFERRING THE MAINTENANCE FROM THE | | | CITY TO THE PROPERTY OWNER. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
04-08-2020 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
04-08-2020 |
Time |
13:50 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
04-08-2020 |
Time |
13:50 |
Sent To |
|
|
| Notes |
| 2020-04-08 13:51:41 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 | | | PROJECT: 1225 PALM BEACH LAKES Z20030016 | | | APRIL 8, 2020 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. PROVIDE THE FOLLOWING CORRECTIONS TO TREE | | | DISPOSITION CHART: | | | ? PROVIDE REASON WHY MAHOGANY #15 IN GOOD CONDITION | | | CANNOT BE RELOCATED. | | | ? CORRECT NOTE AT BOTTOM OF DISPOSITION CHART TO REMOVE | | | WAWA. | | | ? CORRECT SHEET L-01 TO IDENTIFY REMOVALS WITH AN X AND | | | RELOCATES WITH AN R SO THEY ARE CLEARLY IDENTIFIABLE. | | | ? REVISE THE PROVIDED MITIGATION AFTER THE PLAN IS | | | REVISED FOR THE COMMENTS BELOW. | | | | | | | | | 2. PROVIDE THE REQUIRED TERMINAL LANDSCAPE ISLAND WITH | | | 8 FEET LANDSCAPE WIDTH AT THE END OF EACH ROW OF | | | PARKING ALONG THE WEST BUFFER. THE 5 FEET OF REQUIRED | | | LANDSCAPE BUFFER CAN BE A PART OF THE TERMINAL ISLAND, | | | BUT THE 8 FEET INSIDE CURB MUST BE PROVIDED. THE | | | REQUIRED TREE MUST BE PROVIDED IN ADDITION TO THE | | | BUFFER TREE REQUIREMENT. | | | | | | 3. PROVIDE THE REQUIRED TERMINAL LANDSCAPE ISLAND AND | | | REQUIRED TREE AT THE NORTH END OF THE ROW OF PARKING ON | | | THE WEST SIDE OF BUILDING C. | | | | | | 4. SHOW THAT THE SQUARE FOOTAGE OF LANDSCAPE AREA | | | ADJACENT TO THE PARKING SPACE IS AT LEAST 140 SQ FT FOR | | | THE LANDSCAPE ISLANDS THAT HAVE A MODIFIED RADIUS. | | | | | | 5. PROVIDE THE REQUIRED WEST LANDSCAPE BUFFER AT THIS | | | TIME IF THE PROPOSED CROSS ACCESS LANE IS NOT GOING TO | | | BE CONSTRUCTED WITH THE SITE. IF IT IS TO BE A LATER | | | DATE, PROVIDE AN ALTERNATE PLAN FOR THE AREA FOR WHEN | | | THE ACCESS WILL BE CONSTRUCTED. | | | | | | | | | 6. SECTION 94-443(C)(3) REQUIRES THAT A MINIMUM OF 75 | | | PERCENT OF ALL TREES THAT ARE REQUIRED TO BE PLANTED | | | WITHIN THE INTERIOR OF AN OFF STREET PARKING AREA SHALL | | | BE CATEGORY 1 SHADE TREES. SHOW THE PERCENTAGE OF | | | CATEGORY 1 TREES PROVIDED FOR THE REQUIRED LANDSCAPE | | | AREAS AS REQUIRED BY SECTION 94-443(C)(3) FOR TERMINAL | | | AND INTERIOR ISLANDS. THERE ARE 17 REQUIRED ISLANDS AND | | | TREES, MEANING 13 MUST BE CATEGORY 1. | | | | | | | | | 7. THE PARKING SPACES APPEAR TO BE 18 FEET IN LENGTH | | | WITH A CURB AND OVERHANG INTO LANDSCAPE AREAS. STAFF | | | SUGGESTS REDUCING THE PAVED AREAS FOR PARKING SPACES | | | AND PLACING THE CURBS AT 16 FEET TO ALLOW FOR | | | ADDITIONAL PERVIOUS LANDSCAPE AREA AT THE OVERHANG. | | | THIS ALSO ALLOWS MORE LANDSCAPE AREA FOR SUPPORTING THE | | | ROOT ZONES OF THE TREES. | | | | | | 8. LANDSCAPE BUFFERS: | | | | | | ? WEST BUFFER REQUIRES 8 TREES, IF ALEXANDER PALMS ARE | | | TRIPLE TRUNK, THEY CAN COUNT FOR 1 TREE EACH. IF TREE | | | #27 IS COUNTED TOWARD NORTH BUFFER REQUIREMENT, THEN | | | THE PLAN ONLY PROVIDES 5 BUFFER TREES. | | | ? SOUTH BUFFER LENGTH REQUIRES 11 TREES, AND PROVIDES | | | 11 TREES. | | | ? NORTH BUFFER REQUIRES 11 TREES, 11 TREES PROVIDED IF | | | #27 IS COUNTED. | | | ? EAST BUFFER REQUIRES 8 TREES. FOR THE VARIANCE, THE | | | NARRATIVE STATES THERE ARE 8 ADDITIONAL TREES PROVIDED | | | ON SITE TO COMPENSATE. THESE MUST BE IDENTIFIED IN SOME | | | WAY ON THE PLAN. | | | | | | 9. THE PROPOSED PLAN COUNTS EXISTING TREES IN THE | | | LANDSCAPE BUFFER REQUIREMENTS. THESE TREES ARE IN | | | LOCATIONS WHERE CONSTRUCTION OF PAVEMENT, CURBS AND | | | UTILITIES WILL BE IN CLOSE PROXIMITY. INSTRUCTIONS NEED | | | TO BE INCLUDED ON HOW THE CONTRACTOR IS TO HAVE A | | | QUALIFIED CERTIFIED ARBORIST AVAILABLE AS NEEDED TO | | | ASSURE THE TREE ROOT SYSTEMS ARE PROTECTED AND NOT | | | DAMAGED. | | | | | | 10. PROVIDE A DETAIL AND LOCATIONS OF ROOT BARRIERS TO | | | SEPARATE LANDSCAPING FROM UTILITY LINES. | | | | | | 11. SHOW THE LOCATIONS OF ALL SITE LIGHTING ON THE | | | LANDSCAPE PLAN AND REDESIGN THE LOCATIONS OF THE | | | LIGHTING ON SHORTER POLES TO RESOLVE ANY CONFLICTS WITH | | | TREES IN THE PARKING AREA LANDSCAPE ISLANDS. | | | | | | 12. PER SECTION 94-452 ROADWAY BEAUTIFICATION, PROVIDE | | | A PLAN FOR THE REPLACEMENT OF THE ROYAL PALMS IN THE | | | RIGHT OF WAY, AND PROVIDE A SEPARATE SECTION ON THE | | | PLANT LIST FOR THEM. PALM BEACH LAKES BOULEVARD IS PB | | | COUNTY RIGHT OF WAY, AND THE CITY HAS A LANDSCAPE | | | MAINTENANCE AGREEMENT WITH THE COUNTY. IRRIGATION MAY | | | NOT BE WORKING IN THE RIGHT OF WAY, SO IRRIGATION | | | SHOULD BE PROVIDED FROM THE SITE. A MAINTENANCE | | | AGREEMENT SHOULD BE WORKED OUT, AS THE LANDSCAPE | | | MAINTENANCE PROVIDED BY THE CITY MAY NOT BE ADEQUATE TO | | | ENHANCE THE PROJECT. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
4 |
Status |
P |
Date |
02-09-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
02-09-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
02-09-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-02-09 10:27:22 | NO FURTHER COMMENTS FROM DEPT. OF PUBLIC WORKS. | | | | | | MATT HEJAZI | | | [email protected] | | | 822-2045 |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
3 |
Status |
F |
Date |
02-08-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
02-08-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
02-08-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-02-08 12:08:36 | PLEASE PROVIDE THE DUMPSTER ENCLOSURE DETAIL. FOR A | | | FREESTANDING SITE DUMPSTER ENCLOSURE, THE ENCLOSURE | | | SHALL COMPLY WITH THE LATEST REVISION OF CITY OF WEST | | | PALM BEACH GENERAL CONSTRUCTION-GARBAGE ENCLOSURE | | | STANDARD, GC-7. | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
2 |
Status |
F |
Date |
09-21-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
09-21-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
09-21-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-09-21 08:32:47 | | | | PLEASE PROVIDE THE FOLLOWINGS: | | | | | | 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID | | | WASTE VOLUME PRODUCED ALONG WITH THE SIZE AND TYPE OF | | | THE CONTAINER (I.E. DUMPSTER/COMPACTOR) THAT WILL BE | | | UTILIZED THAT WILL BE UTILIZED FOR THE SANITATION | | | SERVICE. | | | | | | | | | 2- REVISED C-06A SHEET TO REFLECT THE CORRECT REVISION | | | OF THE DUMPSTER ENCLOSURE DETAIL. FOR A FREESTANDING | | | SITE DUMPSTER ENCLOSURE, THE ENCLOSURE SHALL COMPLY | | | WITH THE LATEST REVISION OF CITY OF WEST PALM BEACH | | | GENERAL CONSTRUCTION-GARBAGE ENCLOSURE STANDARD, CG-8. | | | | | | 3- AUTO TURN (DYNAMIC ENVELOPE AND THE TIRES PATH) FOR | | | THE SANITATION SERVICE, FRONT LOADER | | | TRUCK WITH THE FOLLOWING SPECS: | | | - TRUCK LENGTH: 35 FT | | | - TRUCK WIDTH: 11 FT | | | - TURNING RADIUS: | | | - SAE TURNING RADIUS: 32.5 FT | | | - CURB-TO-CURB DIAMETER: 74 FT | | | - WALL-TO-WALL DIAMETER: 86.3 FT | | | | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
F |
Date |
03-30-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
03-30-2020 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
03-30-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-03-30 11:16:43 | PLEASE PROVIDE THE FOLLOWINGS: | | | | | | 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID | | | WASTE VOLUME PRODUCED ALONG WITH THE SIZE AND TYPE OF | | | THE CONTAINER (I.E. DUMPSTER/COMPACTOR) THAT WILL BE | | | UTILIZED THAT WILL BE UTILIZED FOR THE SANITATION | | | SERVICE. | | | | | | 2- WHERE VISIBLE TO THE PUBLIC, COMMERCIAL CONTAINERS | | | SHALL BE STORED IN A CITY APPROVED ENCLOSURE | | | OBSTRUCTING THE CONTAINERS VIEW FROM PERSONS USING THE | | | SIDEWALK, STREET, OR THE COMMERCIAL ESTABLISHMENT'S | | | FACILITIES, EXCEPT WHEN ENCLOSURES ARE PROHIBITED, SUCH | | | AS IN DOWNTOWN ALLEYS, OR OTHERWISE APPROVED BY THE | | | CITY. THIS REQUIREMENT INDICATED IN THE CODE OF | | | ORDINANCES, SECTION 74-34-A-2-D. | | | | | | 3- REVISED C-06 SHEET TO RELFECT THE CORRECT REVISION | | | OF THE DUMPSTER ENCLOSURE DETAIL. FOR A FREESTANDING | | | SITE DUMPSTER ENCLOSURE, THE ENCLOSURE SHALL COMPLY | | | WITH THE LATEST REVISION OF CITY OF WEST PALM BEACH | | | GENERAL CONSTRUCTION-GARBAGE ENCLOSURE STANDARD, CG-8. | | | | | | 4- AUTO TURN FOR THE SANITATION SERVICE, FRONT LOADER | | | TRUCK WITH THE FOLLOWING SPECS: | | | - TRUCK LENGTH: 35 FT | | | - TRUCK WIDTH: 11 FT | | | - TURNING RADIUS: | | | - SAE TURNING RADIUS: 32.5 FT | | | - CURB-TO-CURB DIAMETER: 74 FT | | | - WALL-TO-WALL DIAMETER: 86.3 FT | | | | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
3 |
Status |
P |
Date |
02-11-2021 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
02-11-2021 |
Time |
11:58 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
02-11-2021 |
Time |
11:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
F |
Date |
09-22-2020 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
09-22-2020 |
Time |
00:14 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
09-22-2020 |
Time |
00:36 |
Sent To |
|
|
| Notes |
| 2020-09-22 00:36:09 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 8/27/2020 ROUTED SUBMITTAL PACKAGE. | | | | | | 1. A SEPARRATE CONTROL STRUCTION WILL BE NEEDED FOR THE | | | STORMWATER MANAGEMENT SYSTEM. | | | | | | 2. MOVE THE EXFILTRATION TRENCH CLOSER TO WHERE THE | | | CONTROL STRUCTURE WILL BE. | | | A. CAN THE EXFILTRATION TRENCH SHOWN BETWEEN STRUCTURES | | | 2 AND 3 BE MOVED TO BETWEEN STRUCTURES 9 AND 10 AND THE | | | PIPE BETWEEN STRUCTURES 2 AND 3 BE ELIMINATED? | | | B. CAN SOME OF THE EXFILTRATION TRENCH BETWEEN | | | STRUCTURES 2 AND 11 BE MOVED TO BETWEEN STRUCTURES 7 | | | AND 8 AND/OR BETWEEN STRUCTURES 8 AND 9. | | | | | | 3. LABEL WHICH STORM INVERTS ARE TO BE COVERED BY A | | | PRB. | | | | | | 4. DRAINAGE SYSTEM SHOWN ON THE UTILITY PLAN DOES NOT | | | MATCH WHAT IS SHOWN ON THE PGD PLAN. | | | | | | 5. SHOW MILL AND RE-SURFACE LIMITS ON THE UTILITY PLAN | | | FOR THE TRANCH CUTS ON 13TH ST. | | | | | | 6. PROVIDE SHEET 1 OF 2 OF THE SURVEY. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
04-08-2020 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
04-08-2020 |
Time |
18:52 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
04-08-2020 |
Time |
18:54 |
Sent To |
|
|
| Notes |
| 2020-04-08 18:54:38 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. PALM BEACH LAKES BLVD. IS MAINTAINED BY PALM BEACH | | | COUNTY. . APPROVAL FROM THE COUNTY IS REQUIRED FOR ANY | | | IMPROVEMENTS WITHIN BELVEDERE ROAD RIGHT OF WAY. | | | | | | 2. LIST THE VERTICAL DATUM AND CONVERSION EQUATION TO | | | NGVD 1929 ON EVERY SHEET WITH ELEVATION INFORMATION. | | | | | | 3. PROVIDE DRAINAGE AGREEMENT WITH PARCEL ?D? OWNER TO | | | CONNECT TO ITS DRAINAGE SYSTEM AS WELL AS TO TAKE | | | RUNOFF FROM ITS SITE INTO THE NEW DRAINAGE SYSTEM. | | | | | | 4. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP | | | CRITERIA. | | | | | | 5. ROOF DRAINS SHOULD DRAIN TO PERVIOUS AREAS OR BE | | | CONNECTED TO THE DRAINAGE SYSTEM. | | | | | | 6. CONSIDER REDUCING THE PARKING SPACE DEPTHS AND | | | PROVIDE 2 FEET OF GRASSED OVERHANG: | | | - EAST OF BUILDING ?B? | | | - ALONG PALM BEACH BLVD RIGHT OF WAY | | | | | | 7. CONSIDER MOVING INLETS AWAY FROM DRIVEWAY ENTRANCES | | | SO THAT THE DRIVEWAYS WILL NOT BE BLOCKED IF THE | | | PARKING LOT FLOODS. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY | | | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. | | | | | | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED | | | WITH THE ENGINEERING PERMIT APPLICATION. | | | | | | 3. PROVIDE A COPY OF THE SFWMD ERP PRIOR TO STARTING | | | CONSTRUCTION. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
3 |
Status |
P |
Date |
02-05-2021 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
02-05-2021 |
Time |
13:37 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-02-05 13:39:53 | PASSED WITH CONDITIONS: | | | | | | 1. UNITY OF TITLE | | | 2. AGREEMENT WITH ADJOINING OWNER OF DRAINAGE. | | | 3. UTILITY EASEMENTS WILL BE REQUIRED PRIOR TO C.O. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
F |
Date |
10-06-2020 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
10-06-2020 |
Time |
10:57 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-10-06 11:01:45 | 1. SUBMITTED SURVEY WAS ONLY OF SHEET 2 OF 2. IF | | | VERTICAL DATUM IS NAVD 88, NEED CONVERSION FACTOR TO | | | NGVD 29. | | | 2. NEED COPY OF EXISTING CROSS-ACCESS AND DRAINAGE | | | AGREEMENT. | | | 3. REPLAT WILL BE REQUIRED. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
04-08-2020 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
04-08-2020 |
Time |
10:02 |
Rev Time |
|
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-04-08 10:14:27 | 1. NEED COPY OF EXISTING CROSS ACCESS/UTILITY/DRAINAGE | | | AGREEMENT FOR ENTIRE SITE OR THE CREATION OF ONE. | | | 2. UNITY OF TITLE WILL BE REQUIRED. APPLICATION IS MADE | | | THROUGH ENGINEERING SERVICES. | | | 3. ANY MODIFICATIONS IN PALM BEACH LAKES BLVD. WILL | | | REQUIRE PALM BEACH COUNTY APPROVAL. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
4 |
Status |
P |
Date |
03-30-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
03-30-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-03-30 20:27:17 | TRAFFIC COMMENTS | | | | | | APPROVED WITH THE FOLLOWING CONDITION: | | | APPLICANT SHALL RECORD AT LEAST 30-FOOT OF CROSS-ACCESS | | | EASEMENT FOR PEDESTRIANS AND VEHICLES ALONG THE WESTERN | | | BOUNDARY OF THE PROPERTY. THE EASEMENT SHALL BECOME | | | EFFECTIVE WHEN THE WESTERN PROPERTY RE-DEVELOPS AND CAN | | | ONLY BE TERMINATED OR AMENDED WITH CITY'S APPROVAL. | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
3 |
Status |
F |
Date |
02-10-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
02-10-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-02-10 21:04:19 | TRAFFIC COMMENTS: | | | | | | 1) PROVIDE CROSS ACCESS AGREEMENT WITH EXISTING RETAIL | | | ON THE EAST SIDE | | | | | | CONDITION: | | | APPLICANT SHALL RECORD AT LEAST 30-FOOT OF CROSS-ACCESS | | | EASEMENT FOR PEDESTRIANS AND VEHICLES ALONG THE WESTERN | | | BOUNDARY OF THE PROPERTY. THE EASEMENT SHALL BECOME | | | EFFECTIVE WHEN THE WESTERN PROPERTY RE-DEVELOPS AND CAN | | | ONLY BE TERMINATED OR AMENDED WITH CITY'S APPROVAL. | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
2 |
Status |
F |
Date |
10-08-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
10-08-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-10-08 13:18:18 | TRAFFIC STATEMENT COMMENTS: | | | 1. PER COUNTY TPS RECOMMENDATION: DRIVEWAY ON PALM | | | BEACH LAKES BLVD SHALL BE RIGHT-IN/RIGHT-OUT. A RAISED | | | MEDIAN ISLAND SHALL BE INSTALLED AT THE DRIVEWAY AND | | | SHOWCASED IN THE SITE PLAN. RELEVANT SIGNAGE SHALL BE | | | IMPLEMENTED AS WELL. | | | 2. WE MAY WAVE COUNTY RECOMMENDATION PERTAINING CLOSING | | | THE MEDIAN, SO TO ALLOW LEFT-TURNING VEHICLES DRIVING | | | EASTBOUND ON PALM BEACH LAKES BLVD TO TURN INTO THE | | | PROPOSED DEVELOPMENT. HOWEVER, THE FOLLOWING CONDITIONS | | | SHALL BE FULFILLED: | | | A. EXISTING MEDIAN STRIPING ON PALM BEACH LAKES BLVD IN | | | BOTH THE EASTBOUND AND WESTBOUND DIRECTIONS SHALL BE | | | REPAINTED. | | | B. TO AVOID VEHICLES? LEFT-TURN MOVEMENT CONFLICTS, A | | | GORE AREA SHALL BE PAINTED IN BETWEEN THE OPPOSITE | | | TURNING LANES. | | | C. APPLY RETROREFLECTIVE RAISED PAVEMENT MARKERS ALONG | | | THE PERIMETER OF THE MEDIAN STRIPINGS | | | D. INSTALL A RAISED MEDIAN ISLAND AT THE DRIVEWAY ON | | | THE OPPOSITE SIDE OF THE ROAD SO TO ENFORCE | | | RIGHT-IN/RIGHT-OUT VEHICULAR OPERATIONS TOGETHER WITH | | | CORRESPONDING SIGNAGE. | | | SITE PLAN COMMENTS: | | | 3. AUTOTURN ANALYSIS SHOWCASES VARIOUS ENCROACHMENTS | | | BETWEEN VEHICLE PATHS AND INTERNAL CURBS. REVISE SITE | | | PLAN AND ANALYSIS ACCORDINGLY. | | | 4. BIKE RACK DETAIL IS MISSING IN SHEET C-06 | | | 5. SITE DATA TABLE MENTIONS 12 BICYCLE SPACES PROVIDED, | | | BUT ONLY A TOTAL OF 9 ARE SHOWN IN THE SITE PLANS. | | | PLEASE REVISE. | | | | | | CONDITION: | | | 1. APPLICANT SHALL RECORD AT LEAST 30-FOOT OF | | | CROSS-ACCESS EASEMENT FOR PEDESTRIANS AND VEHICLES | | | ALONG THE WESTERN BOUNDARY OF THE PROPERTY. THE | | | EASEMENT SHALL BECOME EFFECTIVE WHEN THE WESTERN | | | PROPERTY RE-DEVELOPS AND CAN ONLY BE TERMINATED OR | | | AMENDED WITH CITY'S APPROVAL. | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
04-07-2020 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-04-07 17:30:41 | TRAFFIC STATEMENT COMMENTS: | | | 1. PROVIDE A TRAFFIC STUDY. | | | 2. PROVIDE COUNTY TPS LETTER. | | | 3. IT IS RECOMMENDED THE APPLICANT TO HAVE A MEETING | | | WITH TRAFFIC TO DETERMINE THE SCOPE OF THE TRAFFIC | | | STUDY. | | | | | | | | | SITE PLAN COMMENTS: | | | 4. PROVIDE COUNTY DRIVEWAY LETTER. | | | 5. SHOW CURBS CUTS AND DRIVEWAYS ON THE OPPOSITE SIDE | | | OF STREET ALONG PALM BEACH LAKES BOULEVARD. | | | 6. PLEASE PROVIDE A SURVEY. | | | 7. REPAVE WITHIN 50-FOOT ON EITHER SIDE OF PAVEMENT CUT | | | ON BOTH SIDES OF THE STREET. | | | 8. DIMENSION THE PARKING AISLE WIDTH FOR THE EASTERN | | | PARKING AISLE SHARED WITH ADVANCED AUTO PARTS. | | | 9. INCLUDE THE REQUIRED AND PROPOSED NUMBER OF LOADING | | | AREA IN THE SITE DATA TABLE AND SITE PLAN. | | | 10. PROVIDE AUTOTURN PATHS FOR GARBAGE, DELIVERY AND | | | SERVICE VEHICLES. | | | 11. VEHICLES AT THE ORDER WINDOW OF BOTH DRIVE-THROUGHS | | | MAY SPILL BACK TO THE PARKING AISLES AND CAUSE ISSUES | | | WITH VEHICLE CIRCULATION. PLEASE VERIFY THE POTENTIAL | | | QUEUES AND REVISE AS NEEDED. | | | 12. INDICATE THE REQUIRED AND PROVIDED NUMBER OF | | | BICYCLE PARKING SPACES IN THE SITE DATA TABLE. PROVIDE | | | BICYCLE PARKING SPACES NEAR THE FRONT ENTRANCE. | | | 13. PROVIDE PEDESTRIAN PATHS TO AND FROM PALM BEACH | | | LAKES BOULEVARD AND 13TH STREET AND BETWEEN EACH | | | BUILDING WITHIN THE SITE. | | | | | | | | | CONDITION: | | | 1. APPLICANT SHALL RECORD AT LEAST 30-FOOT OF | | | CROSS-ACCESS EASEMENT FOR PEDESTRIANS AND VEHICLES | | | ALONG THE WESTERN BOUNDARY OF THE PROPERTY. THE | | | EASEMENT SHALL BECOME EFFECTIVE WHEN THE WESTERN | | | PROPERTY RE-DEVELOPS AND CAN ONLY BE TERMINATED OR | | | AMENDED WITH CITY'S APPROVAL. | | | | | | | | | VALERIO ORICCHIO | | | [email protected] | | | 561-494-1092 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
04-08-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
I |
|
| Notes |
| 2021-04-14 12:53:22 | PLANS AND PLATS REVIEW COMMITTEE (PPRC) ZONING REVIEW | | | ________________________________________ | | | | | | DATE OF REVIEW: 4/8/2021 | | | PROJECT NO.: Z20030016 | | | ________________________________________ | | | | | | CONDITIONS OF APPROVAL | | | | | | 1. THE APPLICANT SHALL RECORD AT LEAST 30 FOOT | | | CROSS-ACCESS EASEMENT FOR PEDESTRIANS AND VEHICLES | | | ACROSS THE WESTERN BOUNDARY OF THE PROPERTY. THE | | | EASEMENT SHALL BECOME EFFECTIVE WHEN THE WESTERN | | | BOUNDARY OF THE PROPERTY RE-DEVELOPS AND AN ONLY BE | | | TERMINATED OR AMENDED WITH CITY'S APPROVAL. | | | | | | QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING: | | | | | | RAFAELA THERMIDOR, ASSOCIATE PLANNER | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION | | | 401 CLEMATIS STREET - P.O. BOX 3147 | | | WEST PALM BEACH, FLORIDA 33402 | | | | | | TTY: 800.955.8771 | | | E: [email protected] | | | W: WPB.ORG | | | | | | ________________________________________ | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
02-11-2021 |
|
|
Cont ID |
|
| Sent By |
rthermid |
Date |
02-11-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
rthermid |
Date |
02-11-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-02-11 11:50:19 | PLANS AND PLATS REVIEW COMMITTEE (PPRC) ZONING REVIEW | | | ________________________________________ | | | | | | DATE OF REVIEW: 2/11/2021 | | | PROJECT NO.: Z20030016 | | | CASE NO.: ISPR 20-13 | | | ________________________________________ | | | | | | PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING | | | REVIEW COMMENTS: | | | | | | 1. PROVIDE CROSS ACCESS AGREEMENT ALONG THE WESTERN | | | SIDE OF THE PROPERTY. | | | ________________________________________ | | | | | | PLEASE NOTE THE FOLLOWING WHEN RESUBMITTING: | | | | | | A) WRITTEN RESPONSES TO COMMENTS MADE BY ALL | | | DEPARTMENTS SHALL BE PROVIDED UPON RESUBMISSION. | | | | | | B) 4 SETS OF REVISED PLANS AND/OR DOCUMENTS SHALL BE | | | PROVIDED, ALONG WITH ONE (1) REDUCED COPY (11IN X | | | 17IN), AND AN ELECTRONIC COPY OF ALL PLANS. | | | | | | C) PLEASE NOTE THAT RE-SUBMITTALS MAY BE SUBJECT TO | | | ADDITIONAL COMMENTS. | | | | | | D) IF NO RESPONSE IS RECEIVED WITHIN 60 DAYS OF THE | | | ISSUANCE OF THESE COMMENTS, THE APPLICATION WILL BE | | | CONSIDERED WITHDRAWN AND ANY FURTHER ACTION WILL | | | REQUIRE SUBMISSION OF A NEW DEVELOPMENT APPLICATION. | | | | | | E) PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20% OF THE ORIGINAL APPLICATION FEE. | | | | | | ________________________________________ | | | | | | QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING: | | | | | | RAFAELA THERMIDOR, ASSOCIATE PLANNER | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION | | | 401 CLEMATIS STREET - P.O. BOX 3147 | | | WEST PALM BEACH, FLORIDA 33402 | | | | | | TTY: 800.955.8771 | | | E: [email protected] | | | W: WPB.ORG |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
10-08-2020 |
|
|
Cont ID |
|
| Sent By |
rthermid |
Date |
10-08-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
rthermid |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-10-08 08:20:41 | PLANS AND PLATS REVIEW COMMITTEE (PPRC) ZONING REVIEW | | | (RESUBMITTAL) | | | ________________________________________ | | | | | | DATE OF REVIEW: 10/07/2020 | | | PROJECT NO.: Z20030016 | | | CASE NO.: ISPR 20-13 | | | ________________________________________ | | | | | | PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING | | | REVIEW COMMENTS WHICH WERE ISSUED PREVIOUSLY, AND HAVE | | | NOT BEEN FULLY SATISFIED: | | | | | | 1. [ PARTIALLY SATISFIED] ? CONTACT CAROLINE PUELL | | | ADDRESSING COORDINATOR AT [email protected] TO ESTABLISH | | | ADDRESSES FOR THE STRUCTURES. | | | 2. ALL PROJECTS TOTALING OVER $750,000 WILL BE SUBJECT | | | TO THE CITY OF WPB ART IN PUBLIC PLACES ORDINANCE. | | | PLEASE CONTACT SYBILLE WELTER AT [email protected] FOR | | | MORE INFORMATION. | | | | | | | | | [ NOT SATISFIED] ? | | | 1. CONSIDER RENAMING THE COVER SHEET. ?AUSTRALIAN LAKES | | | AVE? IS INCORRECT. | | | 2. SHEET C-06 ? DETAIL 7: PARKING DETAIL DOES NOT MEET | | | THE CITY?S REQUIRED STANDARD. | | | 3. SHEET C-06 ? DETAIL 9: THE PROPOSED BICYCLE RACK | | | (WAVE RACK) IS NOT ALLOWED IN THE CITY OF WEST PALM | | | BEACH. PROVIDE REQUIRED BICYCLE PARKING CONSISTENT WITH | | | ALLOWED BIKE RACKS IN THE CITY OF WEST PALM BEACH AND A | | | STANDARD CITY DETAIL. | | | 4. SHEET C-06 ? DETAIL 9: PROVIDE SPACING DIMENSIONS | | | BETWEEN BIKE RACKS. | | | 5. PROVIDE APPROVAL FROM PALM BEACH COUNTY FOR THE | | | PROPOSED DRIVEWAY CONNECTION TO PALM BEACH LAKES | | | BOULEVARD | | | 6. DRIVE AISLES WHERE THERE IS NO BACKING OF PARKING | | | SPACES COULD BE NARROWED TO 20 FEET IN WIDTH FOR | | | TWO-WAY TRAFFIC, SUBJECT TO SHOWING THAT THE TURNING | | | RADIUS WORKS FOR DUMPSTER PICK-UP, DELIVERIES, ETC. | | | 7. CONFIRM THAT THESE BUILDINGS ARE NOT PROPOSED TO BE | | | DIVIDED INTO SEPARATE PARCELS (NOW OR IN THE FUTURE). | | | 8. DRIVEWAYS ONTO 13TH STREET AND PALM BEACH LAKES | | | BOULEVARD DO NOT MEET THE MINIMUM SEPERATION DISTANCES | | | REQUIRED BY SECTION 94-312.2. CONSIDER CONTACTING ALEX | | | HANSEN ? COMPREHENSIVE PLANNER AT [email protected] FOR | | | MORE INFORMATION. | | | 9. PROVIDE THE ANGLE OF THE PARKING STALLS FOR BUILDING | | | B TO CONFIRM COMPLIANCE WITH FIGURE XV-2 IN SECTION | | | 94-485 | | | 10. FOR THE ANGLED PARKING ON BUILDING B, CONSIDER | | | REMOVAL OF THE WHEEL STOPS ?SAWTOOTH? THE CURB LINE. | | | 11. THE BUILDING DIVISION WILL NEED TO CONFIRM THAT THE | | | LOCATION OF THE ACCESSIBLE PARKING SPACES MEET THE ADA | | | REQUIREMENTS | | | 12. CONFIRM THAT THE TURNING MOVEMENTS INTO AND OUT OF | | | THE LOADING ZONE WILL BE IN COMPLIANCE. | | | 13. THE FLOOR PLAN FOR BUILGIN C INDICATES AN OPTIONAL | | | WALK-UP WINDOW, BUT THIS APPEARS TO BE INCONFLICT WITH | | | THE LANDSCAPE PLANS THAT ARE BEING PROVIDED. IT IS NOT | | | SHOWN ON THE ELEVATIONS. IS THE WALK-UP WINDOW BEING | | | PROPOSED? IF SO, MODIFICATIONS TO THE ELEVATIONS, SITE | | | AND LANDSCAPE PLANS WILL BE REQUIRED. | | | 14. ROOFTOP MECHANICAL EQUIPMENT NEEDS TO BE SCREENED | | | FROM VIEW (INCLUDING FROM THE NORTH). | | | 15. BECAUSE THESE BUILDING HAVE FRONTAGE AND VISIBILITY | | | FROM 13TH STREET, CONSIDERING RECONFIGURING THE | | | DESIGN/SCREENING OF WHAT IS THE REAR OF THE BUILDING. | | | 16. BUILDING B ? SHEET A4.0 ? KEY NOTE #17 IS POINTING | | | TO WHAT APPEARS TO BE MECHANICAL EQUIPMENT, BUT THE | | | LEGEND INDICATES THAT #17 IS THE SCUPPER, COLLECTOR, | | | ETC. IT APPEARS SEVERAL NOTES ARE INCORRECT. | | | 17. CONSIDER REVIEWING THE WALL SIGNS FOR COMPLIANCE TO | | | SECTION 94-409 TABLE XIII-1. SIGNAGE IS NOT BEING | | | REVIEWED AT THIS TIME AND IS SUBJECT TO REVIEW AT THE | | | TIME OF PERMITTING. | | | 18. CONSIDER RECONFIGURING THE DRIVE AISLES AND DRIVE | | | THRU TO THE NORTH OF BUILDINGS A, B AND C. CURRENTLY, | | | NO MORE THAN APPROXIMATELY 3-4 CARS COULD STACK WITHOUT | | | BLOCKING THE DRIVE AISLE. THIS WOULD BLOCK ANY ACCESS | | | FROM THE PROPOSED DRIVEWAY ON THE 13TH STREET, THE | | | EXISTING SHARED DRIVEWAY ON 13TH STREET AS WELL AS THE | | | INTERIOR DRIVE AISLES. PROVIDE A STUDY/EVALUATION TO | | | DETERMINE THAT SUFFICIENT STACKING IS BEING PROPOSED | | | WITHOUT IT BACKING UP INTO THE STREET. | | | | | | ________________________________________ | | | | | | PLEASE NOTE THE FOLLOWING WHEN RESUBMITTING: | | | | | | A) WRITTEN RESPONSES TO COMMENTS MADE BY ALL | | | DEPARTMENTS SHALL BE PROVIDED UPON RESUBMISSION. | | | | | | B) 6 SETS OF REVISED PLANS AND/OR DOCUMENTS SHALL BE | | | PROVIDED, ALONG WITH ONE (1) REDUCED COPY (11IN X | | | 17IN), AND AN ELECTRONIC COPY OF ALL PLANS. | | | | | | C) PLEASE NOTE THAT RE-SUBMITTALS MAY BE SUBJECT TO | | | ADDITIONAL COMMENTS. | | | | | | D) IF NO RESPONSE IS RECEIVED WITHIN 60 DAYS OF THE | | | ISSUANCE OF THESE COMMENTS, THE APPLICATION WILL BE | | | CONSIDERED WITHDRAWN AND ANY FURTHER ACTION WILL | | | REQUIRE SUBMISSION OF A NEW DEVELOPMENT APPLICATION. | | | | | | E) PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20% OF THE ORIGINAL APPLICATION FEE. | | | ________________________________________ | | | | | | | | | QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING: | | | | | | RAFAELA THERMIDOR, ASSOCIATE PLANNER | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION | | | 401 CLEMATIS STREET - P.O. BOX 3147 | | | WEST PALM BEACH, FLORIDA 33402 | | | | | | TTY: 800.955.8771 | | | E: [email protected] | | | | | | W: WPB.ORG | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
03-31-2020 |
|
|
Cont ID |
|
| Sent By |
cdglass |
Date |
03-31-2020 |
Time |
13:48 |
Rev Time |
0.00 |
| Received By |
cdglass |
Date |
03-31-2020 |
Time |
13:48 |
Sent To |
|
|
| Notes |
| 2020-03-31 13:47:37 | GENERAL COMMENTS | | | | | | 1. SITE PLAN APPROVAL WILL BE SUBJECT TO A VARIANCE | | | APPROVAL BY THE CITY OF WPB ZONING BOARD OF APPEALS. | | | 2. ALL PROJECTS TOTALING OVER $750,000 WILL BE SUBJECT | | | TO THE CITY OF WPB ART IN PUBLIC PLACES ORDINANCE. | | | PLEASE CONTACT SYBILLE WELTER AT [email protected] FOR | | | MORE INFORMATION. | | | 3. CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT | | | [email protected] TO ESTABLISH ADDRESSES FOR THE | | | STRUCTURES. | | | 4. PLEASE PROVIDE THE THE FOLLOWING ITEMS WHICH WERE | | | MISSING FROM THE APPLICATION: PUBLIC UTILITY LETTER | | | FROM COMCAST, CITY SERVICE LETTER. | | | | | | SITE PLAN COMMENTS | | | | | | CONNECTION/ACCESS | | | 5. PROVIDE PEDESTRIAN CONNECTIONS TO EACH OF THE THREE | | | BUILDINGS FROM THE SIDEWALK ALONG PALM BEACH LAKES | | | BLVD. | | | 6. SHOW ALL ADJACENT DRIVE AISLES AND STREETS FULLY | | | (WITH DIMENSIONS) ON THE PLANS, INCLUDING THE DRIVE | | | AISLE ON THE WEST AND CARVER AVE. | | | 7. PROVIDE DIMENSIONS FOR ALL DRIVE AISLES ON THE | | | SUBJECT PROPERTY. | | | 8. WILL THE NORTHERN DRIVEWAY FROM 13TH STREET BE USED | | | FOR SITE ACCESS? | | | 9. CONSIDER RECONFIGURING THE DRIVE AISLES AND | | | DRIVE-THRU TO THE NORTH OF BUILDING B. CURRENTLY, NO | | | MORE THAN APPROXIMATELY TWO CARS COULD STACK WITHOUT | | | BLOCKING THE DRIVE AISLE. THIS WOULD BLOCK ANY ACCESS | | | FROM 13TH STREET TO BOTH BUILDINGS B AND C. | | | 10. SPECIFICALLY, SHOW DIMENSIONS AND CIRCULATION FOR | | | THE DRIVE AISLE WHICH WILL OVERLAP WITH THE EASTERN | | | ADJACENT PARCEL. | | | PARKING | | | 11. ON PERIMETER PARKING SPOTS, DECREASE THE PARKING | | | STALLS TO BE 16 FEET IN LENGTH TO INCREASE PERVIOUS | | | LANDSCAPED AREA BY TWO FEET. | | | 12. PROVIDE WHEEL STOPS AT THE 18 FOOT PARKING SPOTS | | | ADJACENT TO SIDEWALKS. | | | LANDSCAPE | | | 13. ALL LANDSCAPE TERMINAL ISLANDS SHOULD MEET MINIMUM | | | REQUIREMENTS SET FORTH IN THE SEC. 94-443(3)(A) | | | 14. CORRECT THE TERMINAL ISLAND ON THE WESTERN SIDE OF | | | PARCEL B TO MEET MINIMUM CODE REQUIREMENTS. | | | 15. PROVIDE LANDSCAPE BUFFER MITIGATION ALONG PALM | | | BEACH LAKES BLVD (DISCUSSED FOR LANDSCAPE BUFFER | | | VARIANCE JUSTIFICATION) | | | OTHER SITE PLAN COMMENTS | | | 16. PROVIDE REQUIRED BICYCLE PARKING AND A STANDARD | | | CITY DETAIL. | | | 17. PROVIDE A STANDARD CITY DETAIL OF THE DUMPSTER | | | ENCLOSURES AND CONFIRM ALL DUMPSTER ENCLOSURE?S MEET | | | THE CITY?S STANDARDS. | | | 18. LABEL SITE LIGHTING PLANS APPROPRIATELY (CURRENTLY | | | LABELED AS KFC LIGHTING PLAN AND IT IS FOR THE ENTIRE | | | SITE). | | | 19. INCLUDE DIMENSIONS OF MECHANICAL EQUIPMENT FROM | | | PROPERTY LINES ON BUILDING A. | | | 20. THERE ARE MANY MISSING DIMENSIONS ACROSS THE SITE | | | PLAN (INCLUDING DIMENSIONS FOR ALL STRUCTURES, PROPOSED | | | MONUMENT SIGNS, EXISTING SIDEWALKS, ALL TERMINAL | | | LANDSCAPE ISLANDS, DRIVEWAY APRON, LOADING ZONES, | | | TURNAROUND SPACES) | | | DATA TABLE/LEGEND | | | 21. PLEASE ENCLOSE THE SITE DATA TABLE ELEMENTS WITHIN | | | A TABLE. | | | 22. CORRECT MISSING ELEMENTS IN SITE DATA TABLE | | | (INCLUDING TOTAL GROSS BUILDING SF, ACREAGE OF | | | WATERBODIES, FAR, FUTURE LAND USE, ANY FLOOD ZONES ON | | | SITE, PARENTHESIS AFTER NC, PERVIOUS AND IMPERVIOUS, | | | ETC.) | | | 23. PLEASE MAKE THE PARKING DATA TABLE ELEMENTS MORE | | | CLEAR. THEY ARE CURRENTLY IN A CONFUSING FORMAT. | | | 24. PROVIDE A LEGEND TO CLARIFY WHAT GROUND COVER | | | MATERIALS ARE BEING USED ON THE SITE PLAN. PROVIDE A | | | LEGEND ITEM FOR THE UNIDENTIFIED TRIANGLE HATCH | | | PATTERN. | | | 25. CLARIFY WHAT THE DOTTED LINE IS SURROUNDING | | | BUILDING A AND INCLUDE IN THE LEGEND. | | | | | | INSTRUCTIONS FOR RESUBMITTAL: | | | PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN WRITTEN | | | FORMAT. | | | | | | WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF EIGHT | | | (8) PAPER COPIES, ONE (1) REDUCED COPY IN 8.5 INCHES X | | | 11 INCHES AND ONE (1) SET IN 11 INCHES X 17 INCHES, AND | | | AN ELECTRONIC COPY OF ALL PLANS. NOTE THAT CHANGES ON | | | THE RESUBMITTED PLANS MAY RESULT IN ADDITIONAL | | | COMMENTS. | | | | | | PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20 PERCENT OF THE ORIGINAL APPLICATION FEE. | | | | | | CAROLINE GLASS, AICP | | | GIS PLANNER |
|
|
| |