Plan Review Details - Project Z20020015
| Plan Review Stops For Project Z20020015 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
03-05-2020 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
03-05-2020 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
03-05-2020 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
4 |
Status |
P |
Date |
02-18-2021 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
02-18-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
02-18-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-02-18 07:23:37 | PASSED WITH PROVISOS: | | | | | | COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE | | | SUPERVISOR, CITY OF WEST PALM BEACH PUBLIC UTILITIES, | | | 561-822-2262, [email protected] | | | | | | -DEMO PLAN SAYS WATER METER TO BE REMOVED AND REPLACED. | | | SHOULD INSTEAD SAY WATER METER BOX TO BE REMOVED AND | | | REPLACED. PLEASE UPDATE DURING FORMAL ENGINEERING | | | SUBMITTAL. | | | -NEW WATER METER BOX MUST COMPLY WITH WPB APPROVED | | | MATERIAL LIST. THERE WERE TWO OPTIONS LISTED THAT NEED | | | TO BE REMOVED. PLEASE CORRECT DURING FORMAL ENGINEERING | | | SUBMITTAL. | | | | | | COMMENTS FROM RICK ROSSANO, PROJ. COORDINATOR, CITY OF | | | WPB ENG. SERVICES, [email protected]: | | | | | | FOR ENGINEERING SUBMITTAL, INCLUDE ALL APPLICABLE | | | CURRENT CITY OF WPB GENERAL NOTES AND STANDARD DETAILS. | | | FOR ENGINEERING SUBMITTAL, PLEASE SHOW MIN. 6 IN. | | | SANITARY CLEANOUT PER CITY STANDARD DETAIL GS-6. | | | FOR ENGINEERING SUBMITTAL, PLEASE SHOW EXISTING AND | | | PROPOSED PERVIOUS AND IMPERVIOUS AREAS ON PGD SHEET. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | | | | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES | | | DEPARTMENT | | | DIRECT: (561) 494-1098 | | | MOBILE: (561) 246-9525 | | | FAX: (561) 494-1116 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
3 |
Status |
F |
Date |
01-21-2021 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
01-21-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
01-21-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-01-21 20:16:12 | FOLLOWING COMMENTS FROM MARK HURLEY, FIELD CUSTOMER | | | SERVICE SUPERVISOR | | | CITY OF WEST PALM BEACH PUBLIC UTILITIES, 561-822-2262, | | | [email protected] | | | | | | -FIRE HYDRANT APPEARS TO HAVE PROPOSED RELOCATE INTO A | | | SIDEWALK. FIRE HYDRANT SHOULD NOT BE LOCATED INTO | | | PEDESTRIAN TRAFFIC. | | | | | | -FIRE HYDRANT MAY REQUIRE REPLACEMENT INSTEAD OF | | | RELOCATION. WILL VET FURTHER AT FORMAL ENGINEERING | | | SUBMITTAL. | | | | | | -CANNOT FIND USC APPROVAL FOR PROPOSED BACKFLOW | | | ASSEMBLY. SOME OF THE PROPOSED METER BOXES ARE NOT | | | ACCEPTABLE EITHER. DURING FORMAL ENGINEERING PLAN | | | SUBMITTAL AND APPROVED MATERIAL LIST SUBMISSION, PLAN | | | DESIGNER CAN CORRECT. | | | | | | -ONLY SHOWING EXISTING ?? METER IN UTILITY BILLING | | | DATABASE. FOR 1.5? METER, WOULD NEED NEW TAP AND | | | SERVICE LINE WITH ADDITIONAL UTILITY FEES/CHARGES. IF | | | UPGRADING TO 1.5? METER, THEN WOULD NEED LARGER BOX, | | | AND BOX LOCATION WOULD NEED BE RELOCATED NORTH INTO A | | | SMALL UTILITY EASEMENT AND OUT OF PEDESTRIAN TRAFFIC. | | | | | | -PLEASE CONFIRM LOCATION OF SOUTHERN PROPERTY LINE AND | | | R/W LINE ON UTILITY PLAN ARE CORRECT. | | | | | | -IT APPEARS CONSTRUCTION WILL TAKE PLACE ON TWO | | | PROPERTIES. WILL THE TWO PROPERTIES BE JOINED INTO ONE | | | PROPERTY? | | | | | | -UTILITY PLAN SAYS PALM BEACH COUNTY UTILITIES, BUT | | | WEST PALM BEACH PUBLIC UTILITIES WOULD PROVIDE WATER. | | | PLEASE UPDATE. | | | | | | -WILL PROPERTY USE CITY WATER METER FOR IRRIGATION | | | PURPOSES? | | | | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
F |
Date |
08-26-2020 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
08-26-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
08-26-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-08-26 14:14:22 | FOLLOWING COMMENTS FROM MARK HURLEY, FIELD CUSTOMER | | | SERVICE SUPERVISOR | | | CITY OF WEST PALM BEACH PUBLIC UTILITIES, 561-822-2262, | | | [email protected] | | | | | | -THE EXISTING BACKFLOW ASSEMBLY IS AN OLDER MAKE/MODEL | | | THAT IS NOT LEAD-FREE COMPLIANT WITH CURRENT STANDARDS. | | | RECOMMEND REPLACING IT IN CONJUNCTION WITH WATER | | | SERVICE STANDARD DETAIL WS-6, SINCE FOOD SERVICE IS | | | PROPOSED. | | | | | | -IF REPLACING SIDEWALK WHERE METER BOX IS LOCATED, BE | | | SURE TO USE NEW METER BOX WHEN NEW SIDEWALK IS POURED. | | | BOX MUST COMPLY WITH APPROVED MATERIAL LIST AND BE | | | PROPERLY ALIGNED AND WITH AT LEAST 6? THICK CONCRETE | | | 18? WIDE SURROUNDING IT. | | | | | | FOLLOWING COMMENTS ARE FROM RICK ROSSANO, PROJECT | | | COORDINATOR, ENGINEERING SERVICES DEPARTMENT: | | | | | | 1. PLEASE PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED | | | LOCATION OF WATER METER AND BACKFLOW PREVENTION. | | | 2. PLEASE RESPOND TO ALL COMMENTS IN WRITING. | | | 3. PLEASE ADD DATUM CONVERSION NOTE TO ALL CONSTRUCTION | | | PLAN SHEETS. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | | | | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES | | | DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR, WEST PALM BEACH, FL | | | 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | DIRECT: (561) 494-1098 | | | MOBILE: (561) 246-9525 | | | FAX: (561) 494-1116 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
03-05-2020 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
03-05-2020 |
Time |
|
Rev Time |
|
| Received By |
rrossano |
Date |
03-05-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-03-05 11:39:55 | 1. PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY | | | OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC | | | RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF | | | YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE | | | MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL | | | IN THE WPB ENGINEERING SERVICES DEPARTMENT AT | | | [email protected] OR 561-494-1079 FOR FURTHER | | | ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION | | | ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD | | | SURVEY, POT-HOLING, SOFT DIGS ETC. | | | 2. AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH | | | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, | | | STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR | | | MORE INFORMATION, REFER TO THE LINK BELOW: | | | HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI | | | CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL | | | 3. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS | | | OF ALL WATER, STORM WATER, AND SANITARY AND SEWER | | | LINES, INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER | | | AND SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES, | | | METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE | | | SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING | | | GRADES, PIPES SIZES, MATERIALS, ELEVATIONS, | | | ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL | | | INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER | | | LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE | | | PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN | | | VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. | | | ADDITIONALLY, PLAN VIEW SHALL SHOW ALL EXISTING AND | | | PROPOSED UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER | | | OPTIC, ELECTRIC, GAS, AND CABLEVISION & | | | TELECOMMUNICATION FACILITIES LOCATED ON THE | | | RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL | | | UTILITY CROSSINGS. CUT AND CAP UTILITIES NOT IN USE, | | | AND REMOVE ANY ABANDONED UTILITY LINES LARGER THAN 2 | | | INCHES FROM CITY RIGHT OF WAY. | | | 4. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE | | | DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB | | | DEVELOPMENT APPLICATION). | | | 5. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE SHOW | | | DIMENSIONS OF PROPOSED DUMPSTER ENCLOSURE PER CURRENT | | | CITY OF WPB STANDARD DETAIL GC-8. | | | 6. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY | | | SEWER ARE REQUIRED. | | | 7. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE CALLOUT | | | DOMESTIC BACKFLOW PREVENTER AS RPPA AND FIRE BACKFLOW | | | PREVENTER AS DCDA. | | | 8. PROVIDE VERTICAL DATUM AND DATUM CONVERSION | | | INFORMATION (NAVD 1988 AND NGVD 1929). | | | 9. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND | | | PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM | | | AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE | | | PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER. | | | 10. PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER ALONG | | | ENTIRE PROJECT FRONTAGE. | | | 11. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | EASEMENT FOR PLACEMENT OF PROPOSED WATER METERS. | | | 12. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER | | | METER AND BACKFLOW PREVENTION. | | | 13. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES | | | OF WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS. | | | 14. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING | | | APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT | | | SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING | | | SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED | | | LEAD-FREE DESIGN. | | | 15. FOR FORMAL ENGINEERING SUBMITTAL CLEARLY SHOW ROAD | | | RIGHT OF WAY. | | | 16. FOR FORMAL ENGINEERING SUBMITTAL PROVIDE SANITARY | | | ELEVATIONS AT MANHOLE TIE-IN. | | | 17. FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY MAINS | | | ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY | | | LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT | | | PARCELS. | | | 18. FOR FORMAL ENGINEERING SUBMITTAL, IF WATER MAINS | | | ARE BEING REPLACED IN ROW, SHOW ADJACENT PARCEL | | | ADDRESSES. | | | 19. FOR FORMAL ENGINEERING SUBMITTAL, ADD NOTE TO | | | PROVIDE 50 FT. PAVEMENT RESTORATION TRANSITION ON EACH | | | SIDE OF PROPOSED TRENCH IN CITY MAINTAINED ROADWAY | | | AREAS PER CITY OF WPB STANDARD DETAIL GC-9. | | | 20. PLEASE NOTE THAT A PRE-PPRC-SUBMITTAL MEETING WITH | | | ENGINEERING SERVICES IS HIGHLY SUGGESTED. | | | 21. PLEASE RESPOND TO ALL COMMENTS IN WRITING. | | | | | | | | | FOLLOWING COMMENTS FROM MARK HURLEY, FIELD CUSTOMER | | | SERVICE SUPERVISOR | | | CITY OF WEST PALM BEACH PUBLIC UTILITIES, 561-822-2262, | | | [email protected] | | | | | | -COULD NOT FIND DEDICATED WATER UTILITY PLAN WITH WATER | | | METERS, WATER SERVICES, AND BACKFLOW ASSEMBLIES SHOWN ? | | | PLEASE CREATE AND SUBMIT THAT FOR REVIEW. | | | -PROPOSED TREE INSTALLATIONS SHOULD NOT BE WITHIN 5 | | | FEET OF WATER UTILITIES. | | | -WILL FIRE SPRINKLERS BE USED IN THE BUILDING? | | | | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | | | | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES | | | DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR, WEST PALM BEACH, FL | | | 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | DIRECT: (561) 494-1098 | | | MOBILE: (561) 246-9525 | | | FAX: (561) 494-1116 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | | | | | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
5 |
Status |
P |
Date |
03-01-2021 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
03-01-2021 |
Time |
17:06 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
03-01-2021 |
Time |
17:06 |
Sent To |
|
|
| Notes |
| 2021-03-01 17:06:59 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 2624 N AUSTRALIAN AVE Z20020015 | | | MARCH1, 2021 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. SATISFIED. PROVIDE A TREE DISPOSITION CHART OF THE | | | TREES OR PALMS WITHIN THE AFFECTED AREA AND INDICATE IF | | | THEY WILL BE PRESERVED IN PLACE, RELOCATED OR REMOVED. | | | LIST THE BOTANICAL NAME AND PROVIDE THE CANOPY DIAMETER | | | FOR ANY TREES. | | | | | | 2. SATISFIED. SHOW THE CALCULATIONS FOR MINIMUM SHADE | | | TREE AND FLOWERING TREE REQUIREMENTS PER SECTION | | | 94-443(C)(2)B. BASED ON REQUIRED OPEN SPACE OF 40%. | | | THIS SHOULD BE 20,110 SQ FT. | | | UPDATE TO CURRENT CODE OF ONE TREE PER 1500 SQ FT OR | | | PORTION THEREOF, AND ONE FLOWERING TREE PER 6000 SQ FT | | | OR PORTION THEREOF. ADJUST REQUIRED SHRUBS AT ONE PER | | | 500 SQ FT OR PORTION THEREOF. | | | | | | 3. SATISFIED. PROVIDE THE REQUIRED TERMINAL ISLANDS | | | WITH 8 FEET INTERIOR LANDSCAPE WIDTH AT THE END OF EACH | | | ROW OF PARKING, INCLUDING THE LOADING ZONE AREA. | | | | | | 4. SATISFIED. SECTION 94-443(C)(3) REQUIRES THAT A | | | MINIMUM OF 75 PERCENT OF ALL TREES THAT ARE REQUIRED TO | | | BE PLANTED WITHIN THE INTERIOR OF AN OFF STREET PARKING | | | AREA SHALL BE CATEGORY 1 SHADE TREES. SHOW THE | | | PERCENTAGE OF CATEGORY 1 TREES PROVIDED FOR THE | | | REQUIRED LANDSCAPE AREAS. | | | | | | HIGHRISE LIVE OAK DOES NOT MEET THE CANOPY REQUIREMENT | | | FOR CATEGORY 1 TREES. CHANGE TO SPECIES LIVE OAK. | | | | | | 5. SATISFIED. PROVIDE A PLAN SHOWING THE PARKING | | | LANDSCAPE AREAS COUNTED TOWARD COMPLIANCE WITH SECTION | | | 94-443(C)(3) AND (4) AND PROVIDE CALCULATIONS. | | | PROVIDE A SEPARATE PLAN SHOWING THE THREE AREAS AND | | | PROVIDE THE SQUARE FOOTAGES- PARKING SPACE AREA, OTHER | | | PAVED AREAS, AND INTERIOR LANDSCAPE AREAS AS SHOWN IN | | | SECTION 94-443 FIGURE XIV-1. ADJUST THE DATA IN THE | | | TABLE TO SHOW THE MATCHING SQUARE FOOTAGE AS SHOWN IN | | | THE PLAN. | | | | | | 11-16-20 22 SPACES ARE SHOWN, 220 SQ FT REQUIRED. | | | OTHER VUA SHOULD NOT COUNT PARKING SPACES AREA. IF ALL | | | OTHER VUA IS 4017 SQ FT, THEN 1722.8 SQ FT IS REQUIRED | | | AND ADDED TO 220 SQ FT FOR TOTAL OF 1943 SQ FT. | | | TOTAL THE QUALIFYING INTERIOR LANDSCAPE AREAS AND SHOW | | | THE TOTAL PROVIDED. | | | | | | | | | 6. SATISFIED. SHOW THE LOCATIONS OF REQUIRED 5 FOOT | | | LANDSCAPE BUFFERS ON THE SITE PLAN AND LANDSCAPE PLAN | | | PER SECTION 94-443(D). | | | | | | 7. SATISFIED. BUFFER LENGTHS REQUIRE ONE TREE PER 30 | | | FEET OR PORTION THEREOF. EAST BUFFER REQUIRES 7 TREES, | | | SOUTH BUFFER REQUIRES 8 TREES, NORTH BUFFER REQUIRES 10 | | | TREES. | | | | | | 8. SATISFIED. ADJUST TREE SIZES TO MINIMUM OF 12 FEET | | | IN HEIGHT. UPDATE PALMS REFERENCE TO 3:1 RATIO. | | | | | | | | | 9. SATISFIED. SHOW LOCATIONS OF ALL PROPOSED WATER, | | | SEWER AND DRAINAGE LINES ON THE LANDSCAPE PLAN. | | | ENGINEERING PLANS WERE ONLY FOUND FOR PAVING AND | | | DRAINAGE. | | | | | | 10. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L. | | | PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT | | | MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT | | | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE | | | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH | | | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH | | | FLORIDA LANDSCAPES. | | | PROVIDE THE TOTAL PERCENTAGE BASED ON FINAL PLANT LIST. | | | | | | 11. SATISFIED. SHOW LOCATIONS OF FPL TRANSFORMERS ON | | | THE LANDSCAPE PLAN AND RESOLVE CONFLICTS WITH | | | LANDSCAPING. | | | | | | 12. SATISFIED. PROVIDE A DETAIL AND LOCATIONS OF ROOT | | | BARRIERS TO SEPARATE LANDSCAPING FROM UTILITY LINES. | | | | | | 13. SATISFIED. PROVIDE SCREENING FOR ALL GROUND MOUNTED | | | VALVES AND EQUIPMENT. | | | | | | 14. SATISFIED. SHOW THE LOCATIONS OF ALL SITE LIGHTING | | | ON THE LANDSCAPE PLAN AND RESOLVE ANY CONFLICTS WITH | | | TREES. | | | LOCATIONS NEED TO BE SHOWN TO PREVENT CONFLICTS WITH | | | TREES. THE NOTE #18 DOES NOT ADDRESS THE REQUIRED | | | LOCATIONS FOR TREES THAT COULD BECOME OUT OF COMPLIANCE | | | IF ADJUSTED ACCORDING TO PROPOSED LIGHTING. | | | | | | | | | ADDITIONAL COMMENTS 9/14/20: | | | | | | 15. SATISFIED. THE TREE SPECIES CHOSEN DO NOT MEET THE | | | SHADE TREE DEFINITION AND DO NOT MEET THE INTENT OF THE | | | LANDSCAPE CODE TO REDUCE HEAT ISLAND EFFECT BY | | | PROVIDING AS MUCH TREE CANOPY AS POSSIBLE ON THE SITE. | | | THE BUFFER TREES ARE ONLY RESTRICTED BY OVERHEAD | | | UTILITY LINES ON A PORTION OF THE NORTH PROPERTY LINE. | | | ALL OTHER TREES IN THE BUFFERS SHOULD INCLUDE SHADE | | | TREES TO PROVIDE SHADE AND ALLOW VIEWING OF SIGNAGE AND | | | THE SITE BENEATH THE MATURE CANOPIES. THE SMALL TREE | | | SPECIES PROPOSED DO NOT PROVIDE SHADE FOR THE PAVED | | | AREAS INCLUDING THE BIKE TRAIL AND WILL BLOCK THE VIEW | | | OF SIGNAGE FROM THE STREET AND WILL LEAD TO TRIMMING | | | THE TREES IN AN IMPROPER MANNER. | | | 16. SATISFIED. CORRECT THE REQUIRED LANDSCAPE AREA IN | | | THE DATA CHART TO 15% AND SHOW THE SQUARE FOOTAGE AND | | | PERCENTAGE PROVIDED. | | | ADDITIONAL COMMENT 1-22-21: | | | 17. SATISFIED. THE PROPOSED RIGHT OF WAY AT THE CORNER | | | WITH THE REQUIRED 5 FOOT LANDSCAPE BUFFER HAS AN | | | ENCROACHMENT OF THE PARKING INTO THE BUFFER. MODIFY THE | | | PARKING TO ELIMINATE ENCROACHMENT. | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
4 |
Status |
F |
Date |
01-22-2021 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
01-22-2021 |
Time |
15:16 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
01-22-2021 |
Time |
15:16 |
Sent To |
|
|
| Notes |
| 2021-01-22 15:17:14 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 2624 N AUSTRALIAN AVE Z20020015 | | | JANUARY 22, 2021 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. SATISFIED. PROVIDE A TREE DISPOSITION CHART OF THE | | | TREES OR PALMS WITHIN THE AFFECTED AREA AND INDICATE IF | | | THEY WILL BE PRESERVED IN PLACE, RELOCATED OR REMOVED. | | | LIST THE BOTANICAL NAME AND PROVIDE THE CANOPY DIAMETER | | | FOR ANY TREES. | | | | | | 2. SATISFIED. SHOW THE CALCULATIONS FOR MINIMUM SHADE | | | TREE AND FLOWERING TREE REQUIREMENTS PER SECTION | | | 94-443(C)(2)B. BASED ON REQUIRED OPEN SPACE OF 40%. | | | THIS SHOULD BE 20,110 SQ FT. | | | UPDATE TO CURRENT CODE OF ONE TREE PER 1500 SQ FT OR | | | PORTION THEREOF, AND ONE FLOWERING TREE PER 6000 SQ FT | | | OR PORTION THEREOF. ADJUST REQUIRED SHRUBS AT ONE PER | | | 500 SQ FT OR PORTION THEREOF. | | | | | | 3. SATISFIED. PROVIDE THE REQUIRED TERMINAL ISLANDS | | | WITH 8 FEET INTERIOR LANDSCAPE WIDTH AT THE END OF EACH | | | ROW OF PARKING, INCLUDING THE LOADING ZONE AREA. | | | | | | 4. SATISFIED. SECTION 94-443(C)(3) REQUIRES THAT A | | | MINIMUM OF 75 PERCENT OF ALL TREES THAT ARE REQUIRED TO | | | BE PLANTED WITHIN THE INTERIOR OF AN OFF STREET PARKING | | | AREA SHALL BE CATEGORY 1 SHADE TREES. SHOW THE | | | PERCENTAGE OF CATEGORY 1 TREES PROVIDED FOR THE | | | REQUIRED LANDSCAPE AREAS. | | | | | | HIGHRISE LIVE OAK DOES NOT MEET THE CANOPY REQUIREMENT | | | FOR CATEGORY 1 TREES. CHANGE TO SPECIES LIVE OAK. | | | | | | 5. SATISFIED. PROVIDE A PLAN SHOWING THE PARKING | | | LANDSCAPE AREAS COUNTED TOWARD COMPLIANCE WITH SECTION | | | 94-443(C)(3) AND (4) AND PROVIDE CALCULATIONS. | | | PROVIDE A SEPARATE PLAN SHOWING THE THREE AREAS AND | | | PROVIDE THE SQUARE FOOTAGES- PARKING SPACE AREA, OTHER | | | PAVED AREAS, AND INTERIOR LANDSCAPE AREAS AS SHOWN IN | | | SECTION 94-443 FIGURE XIV-1. ADJUST THE DATA IN THE | | | TABLE TO SHOW THE MATCHING SQUARE FOOTAGE AS SHOWN IN | | | THE PLAN. | | | | | | 11-16-20 22 SPACES ARE SHOWN, 220 SQ FT REQUIRED. | | | OTHER VUA SHOULD NOT COUNT PARKING SPACES AREA. IF ALL | | | OTHER VUA IS 4017 SQ FT, THEN 1722.8 SQ FT IS REQUIRED | | | AND ADDED TO 220 SQ FT FOR TOTAL OF 1943 SQ FT. | | | TOTAL THE QUALIFYING INTERIOR LANDSCAPE AREAS AND SHOW | | | THE TOTAL PROVIDED. | | | | | | | | | 6. SATISFIED. SHOW THE LOCATIONS OF REQUIRED 5 FOOT | | | LANDSCAPE BUFFERS ON THE SITE PLAN AND LANDSCAPE PLAN | | | PER SECTION 94-443(D). | | | | | | 7. SATISFIED. BUFFER LENGTHS REQUIRE ONE TREE PER 30 | | | FEET OR PORTION THEREOF. EAST BUFFER REQUIRES 7 TREES, | | | SOUTH BUFFER REQUIRES 8 TREES, NORTH BUFFER REQUIRES 10 | | | TREES. | | | | | | 8. SATISFIED. ADJUST TREE SIZES TO MINIMUM OF 12 FEET | | | IN HEIGHT. UPDATE PALMS REFERENCE TO 3:1 RATIO. | | | | | | | | | 9. SATISFIED. SHOW LOCATIONS OF ALL PROPOSED WATER, | | | SEWER AND DRAINAGE LINES ON THE LANDSCAPE PLAN. | | | ENGINEERING PLANS WERE ONLY FOUND FOR PAVING AND | | | DRAINAGE. | | | | | | 10. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L. | | | PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT | | | MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT | | | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE | | | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH | | | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH | | | FLORIDA LANDSCAPES. | | | PROVIDE THE TOTAL PERCENTAGE BASED ON FINAL PLANT LIST. | | | | | | 11. SATISFIED. SHOW LOCATIONS OF FPL TRANSFORMERS ON | | | THE LANDSCAPE PLAN AND RESOLVE CONFLICTS WITH | | | LANDSCAPING. | | | | | | 12. SATISFIED. PROVIDE A DETAIL AND LOCATIONS OF ROOT | | | BARRIERS TO SEPARATE LANDSCAPING FROM UTILITY LINES. | | | | | | 13. SATISFIED. PROVIDE SCREENING FOR ALL GROUND MOUNTED | | | VALVES AND EQUIPMENT. | | | | | | 14. SATISFIED. SHOW THE LOCATIONS OF ALL SITE LIGHTING | | | ON THE LANDSCAPE PLAN AND RESOLVE ANY CONFLICTS WITH | | | TREES. | | | LOCATIONS NEED TO BE SHOWN TO PREVENT CONFLICTS WITH | | | TREES. THE NOTE #18 DOES NOT ADDRESS THE REQUIRED | | | LOCATIONS FOR TREES THAT COULD BECOME OUT OF COMPLIANCE | | | IF ADJUSTED ACCORDING TO PROPOSED LIGHTING. | | | | | | | | | ADDITIONAL COMMENTS 9/14/20: | | | | | | 15. SATISFIED. THE TREE SPECIES CHOSEN DO NOT MEET THE | | | SHADE TREE DEFINITION AND DO NOT MEET THE INTENT OF THE | | | LANDSCAPE CODE TO REDUCE HEAT ISLAND EFFECT BY | | | PROVIDING AS MUCH TREE CANOPY AS POSSIBLE ON THE SITE. | | | THE BUFFER TREES ARE ONLY RESTRICTED BY OVERHEAD | | | UTILITY LINES ON A PORTION OF THE NORTH PROPERTY LINE. | | | ALL OTHER TREES IN THE BUFFERS SHOULD INCLUDE SHADE | | | TREES TO PROVIDE SHADE AND ALLOW VIEWING OF SIGNAGE AND | | | THE SITE BENEATH THE MATURE CANOPIES. THE SMALL TREE | | | SPECIES PROPOSED DO NOT PROVIDE SHADE FOR THE PAVED | | | AREAS INCLUDING THE BIKE TRAIL AND WILL BLOCK THE VIEW | | | OF SIGNAGE FROM THE STREET AND WILL LEAD TO TRIMMING | | | THE TREES IN AN IMPROPER MANNER. | | | 16. SATISFIED. CORRECT THE REQUIRED LANDSCAPE AREA IN | | | THE DATA CHART TO 15% AND SHOW THE SQUARE FOOTAGE AND | | | PERCENTAGE PROVIDED. | | | ADDITIONAL COMMENT 1-22-21: | | | 17. THE PROPOSED RIGHT OF WAY AT THE CORNER WITH THE | | | REQUIRED 5 FOOT LANDSCAPE BUFFER HAS AN ENCROACHMENT OF | | | THE PARKING INTO THE BUFFER. MODIFY THE PARKING TO | | | ELIMINATE ENCROACHMENT. | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
3 |
Status |
F |
Date |
11-16-2020 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
11-16-2020 |
Time |
15:47 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
11-16-2020 |
Time |
15:47 |
Sent To |
|
|
| Notes |
| 2020-11-16 15:48:04 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 2624 N AUSTRALIAN AVE Z20020015 | | | NOVEMBER 16, 2020 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. SATISFIED. PROVIDE A TREE DISPOSITION CHART OF THE | | | TREES OR PALMS WITHIN THE AFFECTED AREA AND INDICATE IF | | | THEY WILL BE PRESERVED IN PLACE, RELOCATED OR REMOVED. | | | LIST THE BOTANICAL NAME AND PROVIDE THE CANOPY DIAMETER | | | FOR ANY TREES. | | | | | | 2. SATISFIED. SHOW THE CALCULATIONS FOR MINIMUM SHADE | | | TREE AND FLOWERING TREE REQUIREMENTS PER SECTION | | | 94-443(C)(2)B. BASED ON REQUIRED OPEN SPACE OF 40%. | | | THIS SHOULD BE 20,110 SQ FT. | | | UPDATE TO CURRENT CODE OF ONE TREE PER 1500 SQ FT OR | | | PORTION THEREOF, AND ONE FLOWERING TREE PER 6000 SQ FT | | | OR PORTION THEREOF. ADJUST REQUIRED SHRUBS AT ONE PER | | | 500 SQ FT OR PORTION THEREOF. | | | | | | 3. SATISFIED. PROVIDE THE REQUIRED TERMINAL ISLANDS | | | WITH 8 FEET INTERIOR LANDSCAPE WIDTH AT THE END OF EACH | | | ROW OF PARKING, INCLUDING THE LOADING ZONE AREA. | | | | | | 4. SATISFIED. SECTION 94-443(C)(3) REQUIRES THAT A | | | MINIMUM OF 75 PERCENT OF ALL TREES THAT ARE REQUIRED TO | | | BE PLANTED WITHIN THE INTERIOR OF AN OFF STREET PARKING | | | AREA SHALL BE CATEGORY 1 SHADE TREES. SHOW THE | | | PERCENTAGE OF CATEGORY 1 TREES PROVIDED FOR THE | | | REQUIRED LANDSCAPE AREAS. | | | | | | HIGHRISE LIVE OAK DOES NOT MEET THE CANOPY REQUIREMENT | | | FOR CATEGORY 1 TREES. CHANGE TO SPECIES LIVE OAK. | | | | | | 5. PARTIALLY SATISFIED. PROVIDE A PLAN SHOWING THE | | | PARKING LANDSCAPE AREAS COUNTED TOWARD COMPLIANCE WITH | | | SECTION 94-443(C)(3) AND (4) AND PROVIDE CALCULATIONS. | | | PROVIDE A SEPARATE PLAN SHOWING THE THREE AREAS AND | | | PROVIDE THE SQUARE FOOTAGES- PARKING SPACE AREA, OTHER | | | PAVED AREAS, AND INTERIOR LANDSCAPE AREAS AS SHOWN IN | | | SECTION 94-443 FIGURE XIV-1. ADJUST THE DATA IN THE | | | TABLE TO SHOW THE MATCHING SQUARE FOOTAGE AS SHOWN IN | | | THE PLAN. | | | | | | 11-16-20 22 SPACES ARE SHOWN, 220 SQ FT REQUIRED. | | | OTHER VUA SHOULD NOT COUNT PARKING SPACES AREA. IF ALL | | | OTHER VUA IS 4017 SQ FT, THEN 1722.8 SQ FT IS REQUIRED | | | AND ADDED TO 220 SQ FT FOR TOTAL OF 1943 SQ FT. | | | TOTAL THE QUALIFYING INTERIOR LANDSCAPE AREAS AND SHOW | | | THE TOTAL PROVIDED. | | | | | | | | | 6. SATISFIED. SHOW THE LOCATIONS OF REQUIRED 5 FOOT | | | LANDSCAPE BUFFERS ON THE SITE PLAN AND LANDSCAPE PLAN | | | PER SECTION 94-443(D). | | | | | | 7. SATISFIED. BUFFER LENGTHS REQUIRE ONE TREE PER 30 | | | FEET OR PORTION THEREOF. EAST BUFFER REQUIRES 7 TREES, | | | SOUTH BUFFER REQUIRES 8 TREES, NORTH BUFFER REQUIRES 10 | | | TREES. | | | | | | 8. SATISFIED. ADJUST TREE SIZES TO MINIMUM OF 12 FEET | | | IN HEIGHT. UPDATE PALMS REFERENCE TO 3:1 RATIO. | | | | | | | | | 9. SATISFIED. SHOW LOCATIONS OF ALL PROPOSED WATER, | | | SEWER AND DRAINAGE LINES ON THE LANDSCAPE PLAN. | | | ENGINEERING PLANS WERE ONLY FOUND FOR PAVING AND | | | DRAINAGE. | | | | | | 10. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L. | | | PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT | | | MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT | | | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE | | | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH | | | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH | | | FLORIDA LANDSCAPES. | | | PROVIDE THE TOTAL PERCENTAGE BASED ON FINAL PLANT LIST. | | | | | | 11. SATISFIED. SHOW LOCATIONS OF FPL TRANSFORMERS ON | | | THE LANDSCAPE PLAN AND RESOLVE CONFLICTS WITH | | | LANDSCAPING. | | | | | | 12. SATISFIED. PROVIDE A DETAIL AND LOCATIONS OF ROOT | | | BARRIERS TO SEPARATE LANDSCAPING FROM UTILITY LINES. | | | | | | 13. SATISFIED. PROVIDE SCREENING FOR ALL GROUND MOUNTED | | | VALVES AND EQUIPMENT. | | | | | | 14. PARTIALLY SATISFIED. SHOW THE LOCATIONS OF ALL SITE | | | LIGHTING ON THE LANDSCAPE PLAN AND RESOLVE ANY | | | CONFLICTS WITH TREES. | | | LOCATIONS NEED TO BE SHOWN TO PREVENT CONFLICTS WITH | | | TREES. THE NOTE #18 DOES NOT ADDRESS THE REQUIRED | | | LOCATIONS FOR TREES THAT COULD BECOME OUT OF COMPLIANCE | | | IF ADJUSTED ACCORDING TO PROPOSED LIGHTING. | | | | | | | | | ADDITIONAL COMMENTS 9/14/20: | | | | | | 15. SATISFIED. THE TREE SPECIES CHOSEN DO NOT MEET THE | | | SHADE TREE DEFINITION AND DO NOT MEET THE INTENT OF THE | | | LANDSCAPE CODE TO REDUCE HEAT ISLAND EFFECT BY | | | PROVIDING AS MUCH TREE CANOPY AS POSSIBLE ON THE SITE. | | | THE BUFFER TREES ARE ONLY RESTRICTED BY OVERHEAD | | | UTILITY LINES ON A PORTION OF THE NORTH PROPERTY LINE. | | | ALL OTHER TREES IN THE BUFFERS SHOULD INCLUDE SHADE | | | TREES TO PROVIDE SHADE AND ALLOW VIEWING OF SIGNAGE AND | | | THE SITE BENEATH THE MATURE CANOPIES. THE SMALL TREE | | | SPECIES PROPOSED DO NOT PROVIDE SHADE FOR THE PAVED | | | AREAS INCLUDING THE BIKE TRAIL AND WILL BLOCK THE VIEW | | | OF SIGNAGE FROM THE STREET AND WILL LEAD TO TRIMMING | | | THE TREES IN AN IMPROPER MANNER. | | | 16. SATISFIED. CORRECT THE REQUIRED LANDSCAPE AREA IN | | | THE DATA CHART TO 15% AND SHOW THE SQUARE FOOTAGE AND | | | PERCENTAGE PROVIDED. | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
F |
Date |
09-14-2020 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
09-14-2020 |
Time |
11:32 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
09-14-2020 |
Time |
11:32 |
Sent To |
|
|
| Notes |
| 2020-09-14 11:33:22 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 2624 N AUSTRALIAN AVE Z20020015 | | | SEPTEMBER 14, 2020 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. SATISFIED. PROVIDE A TREE DISPOSITION CHART OF THE | | | TREES OR PALMS WITHIN THE AFFECTED AREA AND INDICATE IF | | | THEY WILL BE PRESERVED IN PLACE, RELOCATED OR REMOVED. | | | LIST THE BOTANICAL NAME AND PROVIDE THE CANOPY DIAMETER | | | FOR ANY TREES. | | | | | | 2. SATISFIED. SHOW THE CALCULATIONS FOR MINIMUM SHADE | | | TREE AND FLOWERING TREE REQUIREMENTS PER SECTION | | | 94-443(C)(2)B. BASED ON REQUIRED OPEN SPACE OF 40%. | | | THIS SHOULD BE 20,110 SQ FT. | | | UPDATE TO CURRENT CODE OF ONE TREE PER 1500 SQ FT OR | | | PORTION THEREOF, AND ONE FLOWERING TREE PER 6000 SQ FT | | | OR PORTION THEREOF. ADJUST REQUIRED SHRUBS AT ONE PER | | | 500 SQ FT OR PORTION THEREOF. | | | | | | 3. SATISFIED. PROVIDE THE REQUIRED TERMINAL ISLANDS | | | WITH 8 FEET INTERIOR LANDSCAPE WIDTH AT THE END OF EACH | | | ROW OF PARKING, INCLUDING THE LOADING ZONE AREA. | | | | | | 4. PARTIALLY SATISFIED. SECTION 94-443(C)(3) REQUIRES | | | THAT A MINIMUM OF 75 PERCENT OF ALL TREES THAT ARE | | | REQUIRED TO BE PLANTED WITHIN THE INTERIOR OF AN OFF | | | STREET PARKING AREA SHALL BE CATEGORY 1 SHADE TREES. | | | SHOW THE PERCENTAGE OF CATEGORY 1 TREES PROVIDED FOR | | | THE REQUIRED LANDSCAPE AREAS. | | | | | | HIGHRISE LIVE OAK DOES NOT MEET THE CANOPY REQUIREMENT | | | FOR CATEGORY 1 TREES. CHANGE TO SPECIES LIVE OAK. | | | | | | 5. PARTIALLY SATISFIED. PROVIDE A PLAN SHOWING THE | | | PARKING LANDSCAPE AREAS COUNTED TOWARD COMPLIANCE WITH | | | SECTION 94-443(C)(3) AND (4) AND PROVIDE CALCULATIONS. | | | PROVIDE A SEPARATE PLAN SHOWING THE THREE AREAS AND | | | PROVIDE THE SQUARE FOOTAGES- PARKING SPACE AREA, OTHER | | | PAVED AREAS, AND INTERIOR LANDSCAPE AREAS AS SHOWN IN | | | SECTION 94-443 FIGURE XIV-1. ADJUST THE DATA IN THE | | | TABLE TO SHOW THE MATCHING SQUARE FOOTAGE AS SHOWN IN | | | THE PLAN. | | | | | | 6. SATISFIED. SHOW THE LOCATIONS OF REQUIRED 5 FOOT | | | LANDSCAPE BUFFERS ON THE SITE PLAN AND LANDSCAPE PLAN | | | PER SECTION 94-443(D). | | | | | | 7. SATISFIED. BUFFER LENGTHS REQUIRE ONE TREE PER 30 | | | FEET OR PORTION THEREOF. EAST BUFFER REQUIRES 7 TREES, | | | SOUTH BUFFER REQUIRES 8 TREES, NORTH BUFFER REQUIRES 10 | | | TREES. | | | | | | 8. SATISFIED. ADJUST TREE SIZES TO MINIMUM OF 12 FEET | | | IN HEIGHT. UPDATE PALMS REFERENCE TO 3:1 RATIO. | | | | | | | | | 9. SATISFIED. SHOW LOCATIONS OF ALL PROPOSED WATER, | | | SEWER AND DRAINAGE LINES ON THE LANDSCAPE PLAN. | | | ENGINEERING PLANS WERE ONLY FOUND FOR PAVING AND | | | DRAINAGE. | | | | | | 10. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L. | | | PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT | | | MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT | | | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE | | | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH | | | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH | | | FLORIDA LANDSCAPES. | | | PROVIDE THE TOTAL PERCENTAGE BASED ON FINAL PLANT LIST. | | | | | | 11. SATISFIED. SHOW LOCATIONS OF FPL TRANSFORMERS ON | | | THE LANDSCAPE PLAN AND RESOLVE CONFLICTS WITH | | | LANDSCAPING. | | | | | | 12. SATISFIED. PROVIDE A DETAIL AND LOCATIONS OF ROOT | | | BARRIERS TO SEPARATE LANDSCAPING FROM UTILITY LINES. | | | | | | 13. SATISFIED. PROVIDE SCREENING FOR ALL GROUND MOUNTED | | | VALVES AND EQUIPMENT. | | | | | | 14. NOT SATISFIED. SHOW THE LOCATIONS OF ALL SITE | | | LIGHTING ON THE LANDSCAPE PLAN AND RESOLVE ANY | | | CONFLICTS WITH TREES. | | | | | | ADDITIONAL COMMENTS 9/14/20: | | | | | | 15. THE TREE SPECIES CHOSEN DO NOT MEET THE SHADE TREE | | | DEFINITION AND DO NOT MEET THE INTENT OF THE LANDSCAPE | | | CODE TO REDUCE HEAT ISLAND EFFECT BY PROVIDING AS MUCH | | | TREE CANOPY AS POSSIBLE ON THE SITE. THE BUFFER TREES | | | ARE ONLY RESTRICTED BY OVERHEAD UTILITY LINES ON A | | | PORTION OF THE NORTH PROPERTY LINE. ALL OTHER TREES IN | | | THE BUFFERS SHOULD INCLUDE SHADE TREES TO PROVIDE SHADE | | | AND ALLOW VIEWING OF SIGNAGE AND THE SITE BENEATH THE | | | MATURE CANOPIES. THE SMALL TREE SPECIES PROPOSED DO NOT | | | PROVIDE SHADE FOR THE PAVED AREAS INCLUDING THE BIKE | | | TRAIL AND WILL BLOCK THE VIEW OF SIGNAGE FROM THE | | | STREET AND WILL LEAD TO TRIMMING THE TREES IN AN | | | IMPROPER MANNER. | | | 16. CORRECT THE REQUIRED LANDSCAPE AREA IN THE DATA | | | CHART TO 15% AND SHOW THE SQUARE FOOTAGE AND PERCENTAGE | | | PROVIDED. | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
03-11-2020 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
03-11-2020 |
Time |
16:51 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
03-11-2020 |
Time |
16:51 |
Sent To |
|
|
| Notes |
| 2020-03-11 16:52:22 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 | | | PROJECT: 2624 N AUSTRALIAN AVE Z20020013 | | | MARCH 11, 2020 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. PROVIDE A TREE DISPOSITION CHART OF THE TREES OR | | | PALMS WITHIN THE AFFECTED AREA AND INDICATE IF THEY | | | WILL BE PRESERVED IN PLACE, RELOCATED OR REMOVED. LIST | | | THE BOTANICAL NAME AND PROVIDE THE CANOPY DIAMETER FOR | | | ANY TREES. | | | | | | 2. SHOW THE CALCULATIONS FOR MINIMUM SHADE TREE AND | | | FLOWERING TREE REQUIREMENTS PER SECTION 94-443(C)(2)B. | | | BASED ON REQUIRED OPEN SPACE OF 40%. THIS SHOULD BE | | | 20,110 SQ FT. | | | UPDATE TO CURRENT CODE OF ONE TREE PER 1500 SQ FT OR | | | PORTION THEREOF, AND ONE FLOWERING TREE PER 6000 SQ FT | | | OR PORTION THEREOF. ADJUST REQUIRED SHRUBS AT ONE PER | | | 500 SQ FT OR PORTION THEREOF. | | | | | | 3. PROVIDE THE REQUIRED TERMINAL ISLANDS WITH 8 FEET | | | INTERIOR LANDSCAPE WIDTH AT THE END OF EACH ROW OF | | | PARKING, INCLUDING THE LOADING ZONE AREA. | | | | | | 4. SECTION 94-443(C)(3) REQUIRES THAT A MINIMUM OF 75 | | | PERCENT OF ALL TREES THAT ARE REQUIRED TO BE PLANTED | | | WITHIN THE INTERIOR OF AN OFF STREET PARKING AREA SHALL | | | BE CATEGORY 1 SHADE TREES. SHOW THE PERCENTAGE OF | | | CATEGORY 1 TREES PROVIDED FOR THE REQUIRED LANDSCAPE | | | AREAS. | | | | | | 5. PROVIDE A PLAN SHOWING THE PARKING LANDSCAPE AREAS | | | COUNTED TOWARD COMPLIANCE WITH SECTION 94-443(C)(3) AND | | | (4) AND PROVIDE CALCULATIONS. | | | | | | 6. SHOW THE LOCATIONS OF REQUIRED 5 FOOT LANDSCAPE | | | BUFFERS ON THE SITE PLAN AND LANDSCAPE PLAN PER SECTION | | | 94-443(D). | | | | | | 7. BUFFER LENGTHS REQUIRE ONE TREE PER 30 FEET OR | | | PORTION THEREOF. EAST BUFFER REQUIRES 7 TREES, SOUTH | | | BUFFER REQUIRES 8 TREES, NORTH BUFFER REQUIRES 10 | | | TREES. | | | | | | 8. ADJUST TREE SIZES TO MINIMUM OF 12 FEET IN HEIGHT. | | | UPDATE PALMS REFERENCE TO 3:1 RATIO. | | | | | | | | | 9. SHOW LOCATIONS OF ALL PROPOSED WATER, SEWER AND | | | DRAINAGE LINES ON THE LANDSCAPE PLAN. ENGINEERING PLANS | | | WERE ONLY FOUND FOR PAVING AND DRAINAGE. | | | | | | 10. SHOW COMPLIANCE WITH SECTION 94-445 L. PLANT | | | SPECIES. A MINIMUM OF 60 PERCENT OF PLANT MATERIAL | | | ADDED SHALL BE FLORIDA NATIVE OR DROUGHT TOLERANT | | | SPECIES SELECTED FROM THE CITY LIST OR THE LIST OF | | | SPECIES IN THE MOST RECENT EDITION OF SOUTH FLORIDA | | | WATER MANAGEMENT DISTRICT WATERWISE SOUTH FLORIDA | | | LANDSCAPES. | | | PROVIDE THE TOTAL PERCENTAGE BASED ON FINAL PLANT LIST. | | | | | | 11. SHOW LOCATIONS OF FPL TRANSFORMERS ON THE LANDSCAPE | | | PLAN AND RESOLVE CONFLICTS WITH LANDSCAPING. | | | | | | 12. PROVIDE A DETAIL AND LOCATIONS OF ROOT BARRIERS TO | | | SEPARATE LANDSCAPING FROM UTILITY LINES. | | | | | | 13. PROVIDE SCREENING FOR ALL GROUND MOUNTED VALVES AND | | | EQUIPMENT. | | | | | | 14. SHOW THE LOCATIONS OF ALL SITE LIGHTING ON THE | | | LANDSCAPE PLAN AND RESOLVE ANY CONFLICTS WITH TREES. | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
5 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
4 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
3 |
Status |
F |
Date |
12-11-2020 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
12-11-2020 |
Time |
06:35 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
12-11-2020 |
Time |
06:45 |
Sent To |
|
|
| Notes |
| 2020-12-11 06:42:24 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 10/29/20 ROUTED SUBMITTAL PACKAGE. COMMENTS #1 THROUGH | | | #5 CAN BE ADDRESSED THROUGH ENGINEERING PERMIT | | | SUBMITTAL. | | | | | | 1. ADD A SCALE BAR TO ALL PLAN SHEETS TO FACILITATE | | | SCALING THE PDF COPIES ON THE COMPUTER. | | | | | | 2. STRIPING LAYOUT SHOWN ON THE PROPOSED PARKING DETAIL | | | ON SHEET C-2.2 DOES NOT MEET THE CITY'S DETAIL FOUND IN | | | THE CODE OF ORDINANCES. THE VERTICAL 4-INCH STRIPES | | | SHOULD BE SPACED 12 INCHES APART (16 INCHES FROM CENTER | | | OF STRIPE TO CENTER OF STRIPE) AND THE ENDS OF THE | | | STRIPES ARE CONNECTED WITH A 4-INCH HORIZONTAL STRIPE. | | | | | | 3. STRUCTURE S-3 IS LISTED WITH THREE INVERTS (NE, S | | | AND W) IN THE DRAINAGE STRUCTURE TABLE BUT THE PLAN | | | VIEW ONLY SHOWS TWO PIPES (E AND S) CONNECTED TO THE | | | STRUCTURE. VERIFY ALL OF THE OTHER STRUCTURES' INVERTS | | | ARE CORRECT. | | | | | | 4. PROVIDE SUMP PER CITY'S DETAIL FOR STRUCTURE S-19 IN | | | THE R/W OF 25TH STREET. | | | | | | 5. INDICATE IF THE DRIVE LANES NORTH AND SOUTH OF THE | | | BUILDING WILL BE INVERTED CROWN OR SHED SECTION. | | | | | | 6. SHOULD THE STOP BAR FOR THE DRIVE THRU LANES BE | | | MOVED FURTHER WEST? THE BUILDING WILL BE IN THE SIGHT | | | TRIANGLE. | | | | | | 7. WHO/WHAT IS THE 10' ACCESS EASEMENT ALONG THE NORTH | | | SIDE OF THE SITE FOR? THE TRANSFORMER AND DUMPSTER ARE | | | LOCATED WITHIN THE EASEMENT. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
F |
Date |
09-21-2020 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
09-21-2020 |
Time |
11:55 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
09-21-2020 |
Time |
15:01 |
Sent To |
|
|
| Notes |
| 2020-09-21 14:40:39 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 8/24/20 SUBMITTAL PACKAGE: | | | | | | 1. LIST THE VERTICAL DATUM AND CONVERSION EQUATION TO | | | NGVD1929 ON ALL SHEETS WITH ELEVATION INFORMATION | | | (SURVEY, SHEETS C-1.0, C-2.0, C-3.1, C-4.0, ETC.) | | | | | | 2. ON SHEET C-1.0 DEMO. PLAN, REMOVE THE EXISTING STORM | | | PIPE ALL THE WAY TO THE CATCH BASIN ON THE NORTH SIDE | | | OF 25TH ST. | | | | | | 3. CONSIDER BREAKING UP THE EXFILTRATION TRENCH BETWEEN | | | STRUCTURES S-9 AND S-10 TO ALLOW THE WATER SERVICE AND | | | SEWER LATERALS TO CROSS OVER THE STORM PIPE OUTSIDE OF | | | THE EXFILTRATION TRENCH. EXTEND THE EXFILTRATTION | | | TRENCH BETWEEN STRUCTURES S-14 AND CS OR ADD | | | EXFILTRATION TRENCH BETWEEN STRUCTURES S-6 AND S-7. | | | | | | 4. IN THE DRAINAGE STRUCTURE SCHEDULE ON SHEET C-3.0, | | | ALL STRUCTURES ARE LISTED AS CATCH BASINS. | | | | | | 5. CONTROL STRUCTURES (WEIRS) USED TO SURCHARGE THE | | | EXFILTRATION TRENCHES CANNOT INCLUDE A BLEEDER. | | | | | | 6. THE WEIR ELEVATION FOR STRUCTURE CS IS LISTED AS | | | 10.00 IN THE DRAINAGE STRUCTURE SCHEDULE TABLE BUT THE | | | TOP OF TRENCH ELEVATION IS SHOWN AS 11.50. | | | | | | 7. USE THE LOWEST CATCH BASIN ELEVATON IN THE | | | EXFILTRATION TRENCH LONGITUDINAL SECTION DETAIL ON | | | SHEET C-3.1. | | | | | | 8. ADD A DRAINAGE CATCH BASIN IN THE SWALE ON THE EAST | | | SIDE OF THE DRIVEWAY ON 25TH ST AND PIPE TO THE | | | EXISTING CATCH BASIN AT THE CORNER OF N. AUSTRALIAN | | | AVE/25TH ST. | | | | | | 9. PROVIDE TYPICAL CROSS SECTIONS FOR ALL FOUR SIDES OF | | | THE PROPERTY, EXTENDING FROM THE CENTERLINE OF THE ROAD | | | RIGHT OF WAY AND CANAL RIGHT OF WAY AND THE NORTH | | | PROPERTY LINE TO INTERIOR POINTS OF THE PAVED AREA. | | | | | | 10. EXPLAIN WHAT THE TOE OF BANK REPRESENTS FOR THE | | | CANAL. THE WATER TABLE IS SHOWN TO BE AT ELEVATION 8 | | | FEET NAVD AND THERE ARE SPOT GRADES BETWEEN 7.8 AND | | | 11.4 ALONG THIS TOE OF BANK LINE. | | | | | | 11. LANDSCAPE PLANS SHOW SEVERAL TREES NEAR OR OVER THE | | | PROPOSED EXFILTRATION TRENCHES AND SEWER LATERALS. | | | | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
03-12-2020 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
03-12-2020 |
Time |
13:58 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
12-11-2020 |
Time |
06:43 |
Sent To |
|
|
| Notes |
| 2020-03-12 13:58:31 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. AUSTRALIAN AVE IS MAINTAINED BY PALM BEACH COUNTY. | | | ANY IMPROVEMENTS IN THE R/W WILL REQUIRE APPROVAL FROM | | | THE COUNTY. | | | | | | 2. SHOW THE EXFILTRATION TRENCH OUTLINES ON THE PGD | | | PLAN. | | | | | | 3. RAISE THE SIDEWALK ALONG 25TH STREET AND MAKE THE | | | BACK OF WALK THE HIGH POINT FOR DRAINAGE. | | | | | | 4. PROVIDE GRADES AT THE SIDEWALK CONNECTION TO 25TH | | | STREET SHOWING THAT RUNOFF FROM THE DRIVE AISLE WILL | | | NOT FLOW DOWN SIDEWALK TO 25TH ST. | | | | | | 5. PROVIDE A HATCHING LEGEND ON THE PDG PLAN. | | | | | | 6. WHAT IS THE PURPOSE OF THE ROUND DRAINAGE STRUCTURE | | | IN THE SOUTHWEST AREA OF THE SITE? | | | | | | 7. GRADE SWALES ALONG 25TH STREET AND AUSTRALIAN AVE TO | | | CREATE RETENTION AREAS. | | | | | | 8. EXFILTRATION TRENCH DETAIL SHOWS PAVEMENT ELEVATION | | | OF 13.20 FEET NAVD BUT ALL OF THE DRAINAGE INLETS HAVE | | | GRATE ELEVATIONS OF 13.50 FEET NAVD OR HIGHER. | | | | | | 9. CONSIDER REDUCING THE PARKING STALL DEPTHS TO CREATE | | | 2 FEET OF OVERHANG IN THE LANDSCAPE AREAS. | | | | | | 10. THE CITY?S VERTICAL DATUM IS NGVD 1929. THE CITY | | | HAS ALLOWED THE USE OF NAVD 1988 PROVIDED THE | | | CONVERSION EQUATION TO NGVD 1929 IS PROVIDED ON THE | | | SHEET(S). LIST THE VERTICAL DATUM AND CONVERSION | | | EQUATION ON ALL SHEETS THAT CONTAIN ELEVATION | | | INFORMATION, INCLUDING THE SURVEY. | | | | | | 11. SHOW PRB?S IN THE STRUCTURE ON THE EXFILTRATION | | | TRENCH LONGITUDINAL SECTION DETAIL. | | | | | | 12. LABEL THE WATER TABLE ELEVATION ON THE EXFILTRATION | | | TRENCH DETAIL. | | | | | | 13. SHOW UTILITIES ON THE LANDSCAPE PLANS. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY | | | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. | | | | | | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED | | | WITH THE ENGINEERING PERMIT APPLICATION. | | | | | | 3. PROVIDE A COPY OF THE SFWMD ERP PRIOR TO STARTING | | | CONSTRUCTION. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
5 |
Status |
P |
Date |
03-08-2021 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
03-08-2021 |
Time |
13:03 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-03-08 13:06:07 | PASSED WITH CONDITIONS: | | | | | | 1. UNITY OF TITLE AFTER DEDICATION OF RIGHT-OF-WAY TO | | | COUNTY PRIOR TO C.O. | | | 2. APPROVAL BY COUNTY OF PROPOSED DEDICATIONS PRIOR TO | | | BUILDING PERMIT. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
4 |
Status |
F |
Date |
03-03-2021 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
03-03-2021 |
Time |
14:50 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-03-03 14:51:33 | 1. AGREE AS TO TIMING OF UNITY OF TITLE AFTER | | | DEDICATION OF RIGHT-OF-WAY. | | | 2. COUNTY APPROVAL REQUIRED PRIOR TO SITE PLAN | | | APPROVAL. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
3 |
Status |
F |
Date |
01-22-2021 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
01-22-2021 |
Time |
07:13 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
12-11-2020 |
Time |
06:42 |
Sent To |
|
|
| Notes |
| 2021-01-22 07:29:13 | 1. UNITY OF CONTROL HAS BEEN REVISED TO UNITY OF TITLE | | | AND RETURNED TO APPLICANT. | | | 2. NEED TO KNOW TIMING OF RIGHT-OF-WAY DEED TO COUNTY | | | AS IT RELATES TO UNITY OF TITLE. LEGAL DESCRIPTION IN | | | UNITY MAY NEED TO BE MODIFIED. | | | 3. NO COUNTY APPROVAL LETTERS. | | | 4. REVISE 10' ACCESS EASEMENT TO FPL OR UTILITY | | | EASEMENT. NEED CONSENT FROM FPL FOR TREES IN EASEMENT. | | | DO NOT INCLUDE DUMPSTER IN EASEMENT. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
F |
Date |
08-31-2020 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
08-31-2020 |
Time |
13:33 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-08-31 13:59:40 | 1. NO UNITY OF TITLE FOUND IN PACKAGE. | | | 2. WHEN/HOW WILL ADDITIONAL R/W OF AUSTRALIAN BE | | | DEDICATED TO COUNTY? | | | 3. EXISTING AUSTRALIAN R/W IS 106'. IF COUNTY REQUIRES | | | 110', WHY IS 9' BEING DEDICATED? | | | 4. APPROVAL BY ALL COUNTY DEPARTMENTS WILL BE REQUIRED | | | PRIOR TO SITE PLAN APPROVAL. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
03-10-2020 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
03-10-2020 |
Time |
14:20 |
Rev Time |
|
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-03-10 14:26:40 | 1. UNITY OF TITLE WILL BE REQUIRED. APPLICATION IS MADE | | | THROUGH ENGINEERING. | | | 2. NO WATER AND SEWER PLAN PROVIDED. | | | 3. ADD CONVERSION FACTOR TO NGVD-29 TO SURVEY AND | | | ENGINEERING PLANS. | | | 4. CHECK WITH PALM BEACH COUNTY AS TO ANY REQUIRED | | | ULTIMATE AUSTRALIAN AVE. RIGHT-OF-WAY. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
2 |
Status |
P |
Date |
11-18-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
11-18-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-11-18 14:19:13 | NO FURTHER COMMENTS. | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | | | | | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
09-10-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
09-10-2020 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-09-11 13:58:37 | TRAFFIC STUDY | | | 1. NOTE: THE TRAFFIC STUDY PROVIDED IN THE LATEST | | | SUBMISSION IS THE SAME AS THE ORIGINAL ONE. PLEASE | | | PROVIDE THE UPDATED VERSION, TILL THEN PREVIOUS | | | COMMENTS STAND. | | | 2. PLEASE REVISE THE REPORT WITH RESPECT TO THE | | | MISPLACED FIGURES AND TABLES | | | 3. REVISE TABLE 2, SOME OF THE LANE CONFIGURATIONS ARE | | | INCORRECT, FOR EXAMPLE: | | | A. 25TH ST BETWEEN BROADWAY AND FLAGLER IS 2L | | | B. TAMARIND AVE BETWEEN 25TH ST AND PALM BEACH LAKES | | | BLVD IS 2L | | | 4. CORRECT TABLE 3, IT SHOULD BE PM | | | 5. FIGURE 4 SHOWS DRIVEWAY LEFT-TURN VOLUMES. HOWEVER, | | | SITE PLAN SHOWS RIGHT-TURN ONLY | | | 6. PLEASE INCLUDE DAILY VOLUMES IN FIGURE 4 | | | 7. DRIVEWAY VOLUMES WILL NEED TO BE REVISITED, | | | CONSIDERING THE RIGHT-IN RIGHT-OUT CONFIGURATION | | | 8. THERE IS A MISMATCH WITH THE TPS LETTER REGARDING | | | DEVELOPMENT INTENSITY. PLEASE REVISE AND OBTAIN AN | | | UPDATED TPS LETTER | | | 9. PROVIDE SIGNAL TIMING SHEETS | | | | | | | | | SITE PLAN | | | 10. LEFT TURN MOVEMENT FROM 25TH EASTBOUND TO DRIVEWAY | | | SHALL BE FORBIDDEN | | | A. 180-FOOT MEDIAN ISLAND IS REQUIRED. AUTOTURN | | | ANALYSIS SHOULD BE PROVIDED FOR THIS MEDIAN DESIGN | | | B. IF RAISED MEDIAN IS NOT ANTICIPATED, PROVIDE | | | JUSTIFICATION THROUGH AN AUTOTURN ANALYSIS SHOWCASING | | | RESTRICTIONS AND/OR ENCROACHMENT OF A LARGE WB-62FL | | | GASOLINE TRUCK WITH THE REQUESTED MEDIAN | | | 11. MILL AND RESURFACE 25TH ST ALONG SITE FRONTAGE, AS | | | NEEDED DUE TO THE RAISED MEDIAN IMPLEMENTATION | | | 12. THE PROPOSED IRRIGATION IS WITHIN THE CITY?S | | | RIGHT-OF-WAY AND MAINTENANCE AGREEMENT WITH THE CITY IS | | | REQUIRED. CONDITION: PROVIDE MAINTENANCE AGREEMENT | | | PRIOR TO ISSUANCE OF A BUILDING PERMIT. | | | | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
5 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
F |
Date |
01-22-2021 |
|
|
Cont ID |
|
| Sent By |
awooten |
Date |
01-22-2021 |
Time |
11:17 |
Rev Time |
0.00 |
| Received By |
awooten |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-01-22 11:17:50 | ZONING REVIEW | Z20020015 | PB 1854 | | | | | | PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. THE APPLICANT WILL | | | BE ACCESSED A RESUBMITTAL FEE. SUCH FEE WILL BE 20% OF | | | THE ORIGINAL APPLICATION FEE. (RECEIVED FOR THIS | | | SUBMITTAL) | | | | | | PLEASE ADDRESS ALL COMMENTS THROUGH A WRITTEN RESPONSE. | | | | | | SITE PLAN REVIEW: | | | | | | -PROVIDE $265 FEE FOR THE UNITY OF TITLE FOR | | | ENGINEERING DIVISION. (NEW COMMENT) | | | | | | -PROVIDE COUNTY APPROVAL FOR THE NEW TURNING LANE ON | | | AUSTRALIAN. (NEW COMMENT) | | | | | | -THE SOUTHWEST CORNER OF THE PROPERTY IS INCLUDED IN | | | THE COUNTY DEDICATION. THERE IS A PARKING SPACE THAT | | | ENCROACHES THE ASSOCIATED 5-FOOT BUFFER ON THE CORNER. | | | THIS PARKING AREA WILL HAVE TO BE ADJUSTED. (NEW | | | COMMENT) | | | | | | -THE PARKING SPACES ADJACENT TO THE BUILDING WITH THE | | | BOLLARDS ARE REQUIRED TO BE 18 FEET IN LENGTH BECAUSE | | | THERE IS NO OVERHANG. (NEW COMMENT) | | | | | | -PROVIDE THE DIMENSIONED DRIVE AISLES IN THE PARKING | | | AREAS. (NEW COMMENT) | | | | | | -THERE IS NOT A PEDESTRIAN ACCESS ON AUSTRALIAN AVENUE. | | | PLEASE CONSIDER. (CONSIDERED) | | | | | | -LOOK AT THE WALGREENS ON SOUTHERN BOULEVARD AND S. | | | DIXIE HIGHWAY (4001 S. DIXIE HIGHWAY) FOR DESIGN | | | OPTIONS TO ACTIVATE THE EAST ELEVATION. (CONSIDERED) | | | | | | -PROVIDE DETAIL ON ALL PARAPET, ROOF EQUIPMENT AND | | | SCREENING. (SATISFIED) | | | | | | -SUBMIT A WATER AND SEWER PLAN. (SATISFIED) | | | | | | -UPDATE THE BICYCLE PARKING DETAIL TO REFLECT THE | | | CITY'S STANDARDS. (SATISFIED) | | | | | | -PROVIDE THE BICYCLE PARKING DATA IN THE INFORMATION | | | TABLE. (SATISFIED) | | | | | | -PROVIDE A TYPICAL DETAIL OF BICYCLE PARKING. | | | (SATISFIED) | | | | | | -AFTER CITY INITIATED REZONING OF THE AREA TO | | | NEIGHBORHOOD COMMERCIAL, A SPECIAL EXCEPTION APPROVAL | | | IS REQUIRED TO HAVE THIS SPECIFIC USE AT THIS LOCATION, | | | WITH TWO WAIVERS. (SEE DETAILS BELOW.) | | | | | | | | | SPECIAL EXCEPTION REVIEW FOR CONVENIENCE/GROCERY STORE | | | AND ACCESSORY MOTOR FUEL SALES (SEC. 94-273. - EXTRA | | | REQUIREMENTS FOR SPECIAL USES OR PERMITTED USES.) | | | (ACKNOWLEDGED /SUBMITTED, FURTHER COMMENTS WILL FOLLOW | | | SPECIAL EXCEPTION REVIEW.) | | | | | | ADDITIONAL STANDARDS WAIVERS NEEDED FOR SPECIAL | | | EXCEPTION APPLICATION: | | | | | | ACCESSORY MOTOR VEHICLE FUEL SALES. ACCESSORY MOTOR | | | VEHICLE FUEL SALES SHALL BE LIMITED TO A MAXIMUM OF TWO | | | PUMP ISLANDS WITH THREE PUMPS PER ISLAND. | | | -A WAIVER WILL BE REQUIRED FOR THE PROPOSED PUMP | | | CONFIGURATION. | | | ALL CONVENIENCE STORES SHALL BE LOCATED A MINIMUM OF | | | 1,000 FEET FROM ANY EXISTING CONVENIENCE STORE AND 100 | | | FEET FROM ANY PREEXISTING PLACE OF RELIGIOUS WORSHIP, | | | PUBLIC OR PRIVATE SCHOOL, OR RESIDENTIAL ZONING | | | DISTRICT. DISTANCE SHALL BE MEASURED FROM PROPERTY LINE | | | TO PROPERTY, WITHOUT REGARD TO INTERVENING STRUCTURES | | | OR OBJECTS. (ACKNOWLEDGED/SUBMITTED, FURTHER COMMENTS | | | WILL FOLLOW SPECIAL EXCEPTION REVIEW.) | | | -A WAIVER WILL BE REQUIRED BECAUSE OF THE EXISTING | | | CHURCH TO THE NORTH OF PROPERTY. | | | | | | ALANA WOOTEN | | | PLANNER | | | PLANNING DIVISION | | | 561-822-1449 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
12-17-2020 |
|
|
Cont ID |
|
| Sent By |
awooten |
Date |
12-17-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
awooten |
Date |
12-17-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-12-17 11:58:43 | ZONING REVIEW | Z20020015 | PB 1854 | | | | | | | | | PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. THE APPLICANT WILL | | | BE ACCESSED A RESUBMITTAL FEE. SUCH FEE WILL BE 20% OF | | | THE ORIGINAL APPLICATION FEE. THE ENGINEERING DIVISION | | | WILL ALSO BE ACCESSING A $265 FEE FOR THE UNITY OF | | | TITLE. | | | | | | PLEASE ADDRESS ALL COMMENTS THROUGH A WRITTEN RESPONSE. | | | | | | SITE PLAN REVIEW: | | | | | | -CHECK WITH TRAFFIC ABOUT THE PLANS FOR 25TH STREET IN | | | THIS AREA. (CONSULTING WITH TRAFFIC) | | | | | | -THERE IS NOT A PEDESTRIAN ACCESS ON AUSTRALIAN AVENUE. | | | PLEASE CONSIDER. (CONSIDERED) | | | | | | -LOOK AT THE WALGREENS ON SOUTHERN BOULEVARD AND S. | | | DIXIE HIGHWAY (4001 S. DIXIE HIGHWAY) FOR DESIGN | | | OPTIONS TO ACTIVATE THE EAST ELEVATION. (CONSIDERED) | | | | | | -PROVIDE DETAIL ON ALL PARAPET, ROOF EQUIPMENT AND | | | SCREENING. (SATISFIED) | | | | | | -SUBMIT A WATER AND SEWER PLAN. (SATISFIED) | | | | | | -UPDATE THE BICYCLE PARKING DETAIL TO REFLECT THE | | | CITY'S STANDARDS. (SATISFIED) | | | | | | -PROVIDE THE BICYCLE PARKING DATA IN THE INFORMATION | | | TABLE. (SATISFIED) | | | | | | -PROVIDE A TYPICAL DETAIL OF BICYCLE PARKING. | | | (UNSATISFIED) | | | | | | AFTER CITY INITIATED REZONING OF THE AREA TO | | | NEIGHBORHOOD COMMERCIAL, A SPECIAL EXCEPTION APPROVAL | | | IS REQUIRED TO HAVE THIS SPECIFIC USE AT THIS LOCATION, | | | WITH TWO WAIVERS. (SEE DETAILS BELOW.) | | | | | | SPECIAL EXCEPTION REVIEW FOR CONVENIENCE/GROCERY STORE | | | AND ACCESSORY MOTOR FUEL SALES (SEC. 94-273. - EXTRA | | | REQUIREMENTS FOR SPECIAL USES OR PERMITTED USES.) | | | (ACKNOWLEDGED /SUBMITTED, FURTHER COMMENTS WILL FOLLOW | | | SPECIAL EXCEPTION REVIEW.) | | | | | | ADDITIONAL STANDARDS WAIVERS NEEDED FOR SPECIAL | | | EXCEPTION APPLICATION: | | | | | | ACCESSORY MOTOR VEHICLE FUEL SALES. ACCESSORY MOTOR | | | VEHICLE FUEL SALES SHALL BE LIMITED TO A MAXIMUM OF TWO | | | PUMP ISLANDS WITH THREE PUMPS PER ISLAND. | | | | | | -A WAIVER WILL BE REQUIRED FOR THE PROPOSED PUMP | | | CONFIGURATION. | | | | | | ALL CONVENIENCE STORES SHALL BE LOCATED A MINIMUM OF | | | 1,000 FEET FROM ANY EXISTING CONVENIENCE STORE AND 100 | | | FEET FROM ANY PREEXISTING PLACE OF RELIGIOUS WORSHIP, | | | PUBLIC OR PRIVATE SCHOOL, OR RESIDENTIAL ZONING | | | DISTRICT. DISTANCE SHALL BE MEASURED FROM PROPERTY LINE | | | TO PROPERTY, WITHOUT REGARD TO INTERVENING STRUCTURES | | | OR OBJECTS. (ACKNOWLEDGED/SUBMITTED, FURTHER COMMENTS | | | WILL FOLLOW SPECIAL EXCEPTION REVIEW.) | | | | | | -A WAIVER WILL BE REQUIRED BECAUSE OF THE EXISTING | | | CHURCH TO THE NORTH OF PROPERTY. | | | | | | ALANA WOOTEN | | | PLANNER | | | PLANNING DIVISION | | | 561-822-1449 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
09-21-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
09-21-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
09-21-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-09-21 16:31:42 | ZONING REVIEW | Z20020015 | PB 1854 | | | | | | PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. THE APPLICANT WILL | | | BE ACCESSED A RESUBMITTAL FEE. SUCH FEE WILL BE 20% OF | | | THE ORIGINAL APPLICATION FEE. | | | | | | PLEASE ADDRESS ALL COMMENTS THROUGH A WRITTEN RESPONSE. | | | | | | | | | SITE PLAN REVIEW: | | | | | | -CHECK WITH TRAFFIC ABOUT THE PLANS FOR 25TH STREET IN | | | THIS AREA. (CONSULTING WITH TRAFFIC) | | | | | | -THERE IS NOT A PEDESTRIAN ACCESS ON AUSTRALIAN AVENUE. | | | PLEASE CONSIDER. (CONSIDERED) | | | | | | -LOOK AT THE WALGREENS ON SOUTHERN BOULEVARD AND S. | | | DIXIE HIGHWAY (4001 S. DIXIE HIGHWAY) FOR DESIGN | | | OPTIONS TO ACTIVATE THE EAST ELEVATION. (CONSIDERED) | | | | | | -PROVIDE DETAIL ON ALL PARAPET, ROOF EQUIPMENT AND | | | SCREENING. (SATISFIED) | | | | | | -SUBMIT A WATER AND SEWER PLAN. (SATISFIED) | | | | | | -UPDATE THE BICYCLE PARKING DETAIL TO REFLECT THE | | | CITY'S STANDARDS. (SATISFIED) | | | | | | -PROVIDE THE BICYCLE PARKING DATA IN THE INFORMATION | | | TABLE. (NEW COMMENT) | | | | | | AFTER CITY INTIATED REZONING OF THE AREA TO | | | NEIGHBORHOOD COMMERCIAL, A SPECIAL EXCEPTION APPROVAL | | | IS REQUIRED TO HAVE THIS SPECIFIC USE AT THIS LOCATION, | | | WITH TWO WAIVERS. (SEE DETAILS BELOW.) | | | | | | SPECIAL EXCEPTION REVIEW FOR CONVENIENCE/GROCERY STORE | | | AND ACCESSORY MOTOR FUEL SALES (SEC. 94-273. - EXTRA | | | REQUIREMENTS FOR SPECIAL USES OR PERMITTED USES.) | | | (ACKNOWLEDGED /SUBMITTED, FURTHER COMMENTS WILL FOLLOW | | | SPECIAL EXCEPTION REVIEW.) | | | | | | ADDITIONAL STANDARDS WAIVERS NEEDED FOR SPECIAL | | | EXCEPTION APPLICATION: | | | | | | ACCESSORY MOTOR VEHICLE FUEL SALES. ACCESSORY MOTOR | | | VEHICLE FUEL SALES SHALL BE LIMITED TO A MAXIMUM OF TWO | | | PUMP ISLANDS WITH THREE PUMPS PER ISLAND. | | | | | | -A WAIVER WILL BE REQUIRED FOR THE PROPOSED PUMP | | | CONFIGURATION. | | | | | | ALL CONVENIENCE STORES SHALL BE LOCATED A MINIMUM OF | | | 1,000 FEET FROM ANY EXISTING CONVENIENCE STORE AND 100 | | | FEET FROM ANY PREEXISTING PLACE OF RELIGIOUS WORSHIP, | | | PUBLIC OR PRIVATE SCHOOL, OR RESIDENTIAL ZONING | | | DISTRICT. DISTANCE SHALL BE MEASURED FROM PROPERTY LINE | | | TO PROPERTY, WITHOUT REGARD TO INTERVENING STRUCTURES | | | OR OBJECTS. (ACKNOWLEDGED/SUBMITTED, FURTHER COMMENTS | | | WILL FOLLOW SPECIAL EXCEPTION REVIEW.) | | | | | | -A WAIVER WILL BE REQUIRED BECAUSE OF THE EXISTING | | | CHURCH TO THE NORTH OF PROPERTY. | | | | | | FURTHER COMMENTS MAY FOLLOW ADDITIONAL REVIEWS. | | | | | | ALANA WOOTEN | | | PLANNER | | | PLANNING DIVISION | | | 561-822-1449 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
03-10-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
03-10-2020 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
03-10-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-03-10 12:13:36 | ***************************ZONING | | | REVIEW**************************** | | | | | | | | | SITE PLAN REVIEW: | | | | | | -CHECK WITH TRAFFIC ABOUT THE PLANS FOR 25TH STREET IN | | | THIS AREA. | | | -THERE IS NOT A PEDESTRIAN ACCESS ON AUSTRALIAN AVENUE. | | | PLEASE CONSIDER. | | | -LOOK AT THE WALGREENS ON SOUTHERN BOULEVARD AND S. | | | DIXIE HIGHWAY (4001 S. DIXIE HIGHWAY) FOR DESIGN | | | OPTIONS TO ACTIVATE THE EAST ELEVATION. | | | -PROVIDE DETAIL ON ALL PARAPET, ROOF EQUIPMENT AND | | | SCREENING. | | | -SUBMIT A WATER AND SEWER PLAN. | | | -UPDATE THE BICYCLE PARKING DETAIL TO REFLECT THE | | | CITY'S STANDARDS. | | | | | | SPECIAL EXCEPTION REVIEW FOR CONVENIENCE/GROCERY STORE | | | AND ACCESSORY MOTOR FUEL SALES (SEC. 94-273. - EXTRA | | | REQUIREMENTS FOR SPECIAL USES OR PERMITTED USES.) | | | | | | ADDITIONAL STANDARDS WAIVERS NEEDED FOR SPECIAL | | | EXCEPTION APPLICATION: | | | | | | ACCESSORY MOTOR VEHICLE FUEL SALES. ACCESSORY MOTOR | | | VEHICLE FUEL SALES SHALL BE LIMITED TO A MAXIMUM OF TWO | | | PUMP ISLANDS WITH THREE PUMPS PER ISLAND. | | | | | | -A WAIVER WILL BE REQUIRED FOR THE PROPOSED PUMP | | | CONFIGURATION. | | | | | | ALL CONVENIENCE STORES SHALL BE LOCATED A MINIMUM OF | | | 1,000 FEET FROM ANY EXISTING CONVENIENCE STORE AND 100 | | | FEET FROM ANY PREEXISTING PLACE OF RELIGIOUS WORSHIP, | | | PUBLIC OR PRIVATE SCHOOL, OR RESIDENTIAL ZONING | | | DISTRICT. DISTANCE SHALL BE MEASURED FROM PROPERTY LINE | | | TO PROPERTY, WITHOUT REGARD TO INTERVENING STRUCTURES | | | OR OBJECTS. | | | | | | -A WAIVER WILL BE REQUIRED BECAUSE OF THE EXISTING | | | CHURCH TO THE NORTH OF PROPERTY. | | | | | | FURTHER COMMENTS MAY FOLLOW ADDITIONAL REVIEWS. | | | | | | ALANA WOOTEN | | | PLANNER | | | PLANNING DIVISION | | | 561-822-1449 | | | [email protected] | | | | | | |
|
|
| |