Plan Review Details - Project Z19110010
| Plan Review Stops For Project Z19110010 |
| Review Stop |
AIPP |
ART IN PUBLIC PLACES |
| Rev No |
1 |
Status |
F |
Date |
04-08-2021 |
|
|
Cont ID |
|
| Sent By |
scwelter |
Date |
04-08-2021 |
Time |
16:23 |
Rev Time |
0.00 |
| Received By |
scwelter |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-04-08 16:25:43 | PUBLIC ART REQUIREMENT: | | | IF TOTAL CONSTRUCTION COSTS OF THIS DEVELOPMENT ARE | | | OVER $500,000 IT WILL BE SUBJECT TO THE PUBLIC ART | | | REQUIREMENT AS PER CITY ORDINANCE. | | | SECTION 78-129: ALL PRIVATE DEVELOPMENT PROJECTS, | | | INCLUDING NEW CONSTRUCTION, OR THE RENOVATION OR | | | IMPROVEMENT OF AN EXISTING BUILDING, WHERE TOTAL | | | CONSTRUCTION COSTS ARE EQUAL TO OR GREATER THAN | | | $500,000 ARE SUBJECT TO THE PUBLIC ART REQUIREMENT. | | | OPTION 1: INSTALL ARTWORK ON THE DEVELOPMENT SITE | | | VALUED IN AN AMOUNT NOT LESS THAN ONE PERCENT OF THE | | | TOTAL CONSTRUCTION COSTS; OR | | | OPTION 2: CONTRIBUTE AN AMOUNT EQUAL TO 75 PERCENT OF | | | ONE PERCENT OF THE TOTAL CONSTRUCTION COSTS FOR DEPOSIT | | | TO THE PUBLIC ART ACCOUNT. | | | A COMPLETED PUBLIC ART ASSESSMENT APPLICATION IS | | | REQUIRED AT TIME OF BUILDING PERMIT SUBMITTAL. | | | | | | PLEASE CONTACT SYBILLE WELTER AT [email protected] OR | | | 561.822.1521 TO OBTAIN AN APPLICATION AND REVIEW THE | | | REQUIREMENTS. | | | | | | EMAILED DEVELOPER PUBLIC ART ASSESSMENT 4.08.2021 | | | IF OPTION 1 MUST SHOW ART SITES ON SITE PLAN. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
09-17-2020 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
09-17-2020 |
Time |
17:33 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
09-17-2020 |
Time |
17:32 |
Sent To |
|
|
| Notes |
| 2020-09-17 17:58:24 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | USING COMMENT NUMBERING SEQUENCE FROM THE 7/8/20 | | | REVIEW, COMMENT # 4 HAS NOT BEEN COMPLETELY ADDRESSED: | | | | | | 4. NUMBER OF ACCESSIBLE PARKING SPACES. THE DATA TABLE | | | ON SITE PLAN SHEET SP-1 HAS BEEN UPDATED TO SHOW A | | | TOTAL OF 529 PARKING SPACES WITH 387 OF THOSE BEING ON | | | LOT 4S AND THE OTHER 142 BEING ON LOT 4N. THE DATA | | | TABLE STATES THAT 8 ACCESSIBLE PARKING SPACES WILL BE | | | PROVIDED ON LOT 4S AND ANOTHER 4 ACCESSIBLE PARKING | | | SPACES WILL BE PROVIDED ON LOT 4N. THE STATED INTENTION | | | TO PROVIDE 12 ACCESSIBLE PARKING SPACES MEETS THE | | | REQUIRED MINIMUM NUMBER REQUIRED HOWEVER, LOOKING AT | | | THE SITE PLAN, CIVIL ENGINEERING PLAN AND ARCHITECTURAL | | | PLANS, NOT ALL 12 ACCESSIBLE PARKING SPACES ARE SHOWN | | | ON THE PLANS. THERE ARE 8 ACCESSIBLE PARKING SPACES | | | SHOWN IN THE PARKING GARAGE, AND 2 ACCESSIBLE PARKING | | | SPACES SHOWN ADJACENT TO THE EXISTING 2-STORY BUILDING | | | OFFICE BUILDING ON LOT 4 NORTH. THAT IS A TOTAL OF 10 | | | ACCESSIBLE PARKING SPACES, SO 2 MORE ARE REQUIRED ON | | | LOT 4N TO GET TO THE PROPOSED TOTAL OF 12 ACCESSIBLE | | | PARKING SPACES. WHEN THE PLANS ARE SUBMITTED FOR | | | PERMIT, THE PLANS MUST SHOW THE LOCATION OF ALL | | | REQUIRED ACCESSIBLE PARKING SPACES. | | | | | | | | | THE RESPONSES TO THE REMAINDER OF THE COMMENTS ARE | | | NOTED. | | | | | | | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | | | 2020-08-21 14:29:11 | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
07-08-2020 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
07-08-2020 |
Time |
19:25 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
07-08-2020 |
Time |
19:25 |
Sent To |
|
|
| Notes |
| 2020-07-08 19:39:13 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. FLOOD ZONE. ACCORDING TO THE ADOPTED FLOOD INSURANCE | | | RATE MAPS (FIRMS), THE PROPOSED BUILDING IS IN FLOOD | | | ZONE AE, WITH A BASE FLOOD ELEVATION OF 12.7 FT NAVD. | | | THE FIRST FLOOR OF THE BUILDING AND ALL ASSOCIATED | | | MECHANICAL EQUIPMENT (CHILLERS, GENERATORS ETC.) SHALL | | | BE 24 INCHES (FREEBOARD) ABOVE THE BASE FLOOD | | | ELEVATION. | | | | | | 3. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 4. NUMBER OF ACCESSIBLE PARKING SPACES. THE DATA TABLE | | | ON SITE PLAN SHEET SP-1 IS NOT CLEAR AS TO HOW MANY | | | PARKING SPACES ARE BEING PROVIDED IN TOTAL. IF THE | | | TOTAL IS 526 PARKING SPACES THE PROPOSED 9 ACCESSIBLE | | | PARKING SPACES ARE NOT ENOUGH. FAIR HOUSING ACT | | | REQUIRES 2% OF THE POVIDED PARKING SPACES TO BE | | | ACCESSIBLE SO 11 ACCESSIBLE PARKING SPACES WOULD BE | | | REQUIRED. ALSO, THE ARCHITECTURAL PLANS A-2.1 THROUGH | | | A-2.6 ONLY SHOW A TOTAL OF 8 ACCESSIBLE PARKING SPACES. | | | | | | 5. ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE DOES | | | NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL OPENINGS TO | | | MEET THE DEFINITION OF AN OPEN PARKING GARAGE, IT WILL | | | BE CONSIDERED AN ENCLOSED PARKING GARAGE AND MUST HAVE | | | EXHAUST SYSTEMS. THE EXHAUST SYSTEMS SHALL BE DESIGNED | | | TO MINIMIZE NOISE LEVELS USING INLINE FAN SILENCERS OR | | | OTHER APPROVED METHODS. | | | | | | 6. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS, | | | GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND | | | OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS, | | | SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC. | | | | | | 7. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND | | | CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF | | | CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL | | | NEIGHBORING PROPERTIES. | | | | | | 8. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER | | | AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY, | | | INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE | | | CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF | | | NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION | | | THAT MAY AFFECT THE USE OF THEIR PROPERTY. | | | | | | 9. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT | | | WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL | | | HAVE A SEPARATE ADDRESS. FOR STREET ADDRESSING, CONTACT | | | MICHAEL ORIO, GIS SUPPORT SPECIALIST, AT (561) 494 | | | 1080, OR BY EMAIL: [email protected] | | | | | | 10. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT | | | TO ART IN PUBLIC PLACES (AIPP) ASSESSMENT. FOR ADVICE | | | ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP | | | ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC | | | PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL: | | | [email protected] | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
12-10-2019 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
12-10-2019 |
Time |
19:32 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
12-10-2019 |
Time |
19:32 |
Sent To |
|
|
| Notes |
| 2019-12-10 19:45:52 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. FLOOD ZONE. ACCORDING TO THE ADOPTED FLOOD INSURANCE | | | RATE MAPS (FIRMS), THE PROPOSED BUILDING IS IN FLOOD | | | ZONE AE, WITH A BASE FLOOD ELEVATION OF 12.7 FT NAVD. | | | THE FIRST FLOOR OF THE BUILDING AND ALL ASSOCIATED | | | MECHANICAL EQUIPMENT (CHILLERS, GENERATORS ETC.) SHALL | | | BE 24 INCHES (FREEBOARD) ABOVE THE BASE FLOOD | | | ELEVATION. | | | | | | 3. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 4. SECOND MEANS OF EGRESS FROM LEVELS 1 THROUGH 5. | | | STAIR 1 IS ONE MEANS OF EGRESS TO EXIT LEVELS 2 THROUGH | | | 5. IS IT THE INTENTION FOR THE SECOND MEANS OF EGRESS | | | TO BE THROUGH THE PARKING GARAGE? IF SO, THE ELEVATOR | | | LOBBY DOORS TO AND FROM THE PARKING GARAGE SHALL SWING | | | IN THE DIRECTION OF EGRESS. ARE THOSE DOORS ALSO | | | INTENDED TO PROVIDE EGRESS FROM THE PARKING GARAGE | | | TOWARD STAIR 1, WHICH WOULD REQUIRE THAT THEY ALSO | | | SWING IN THE OTHER DIRECTION? FIRE RATED DOORS CANNOT | | | SWING IN BOTH DIRECTIONS. | | | | | | 5. ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE DOES | | | NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL OPENINGS TO | | | MEET THE DEFINITION OF AN OPEN PARKING GARAGE, IT WILL | | | BE CONSIDERED AN ENCLOSED PARKING GARAGE AND MUST HAVE | | | EXHAUST SYSTEMS. THE EXHAUST SYSTEMS SHALL BE DESIGNED | | | TO MINIMIZE NOISE LEVELS USING INLINE FAN SILENCERS OR | | | OTHER APPROVED METHODS. | | | | | | 6. GREASE INTERCEPTOR. IF THERE IS TO BE COOKING IN THE | | | CAFE, A GREASE INTERCEPTOR WILL BE REQUIRED. PLEASE | | | CONTACT JEFFREY ODOMS, UTILITIES O&M SUPERINTENDENT, | | | PUBLIC UTILITIES DEPARTMENT, FATS OILS AND GREASE | | | DIVISION, AT (561) 822-2172, OR BY EMAIL: | | | [email protected] | | | | | | 7. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS, | | | GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND | | | OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS, | | | SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC. | | | | | | 8. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND | | | CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF | | | CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL | | | NEIGHBORING PROPERTIES. | | | | | | 9. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER | | | AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY, | | | INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE | | | CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF | | | NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION | | | THAT MAY AFFECT THE USE OF THEIR PROPERTY. | | | | | | 10. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT | | | WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL | | | HAVE A SEPARATE ADDRESS. FOR STREET ADDRESSING, CONTACT | | | MICHAEL ORIO, GIS SUPPORT SPECIALIST, AT (561) 494 | | | 1080, OR BY EMAIL: [email protected] | | | | | | 11. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT | | | TO ART IN PUBLIC PLACES (AIPP) ASSESSMENT. FOR ADVICE | | | ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP | | | ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC | | | PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL: | | | [email protected] | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
4 |
Status |
P |
Date |
11-05-2020 |
|
|
Cont ID |
|
| Sent By |
RROSSANO |
Date |
11-05-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
11-05-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-11-05 06:55:48 | COMMENTS FROM RICK ROSSANO, PROJ. COORD., CITY OF WPB | | | ENG. SERVICES, [email protected], 561-494-1098: | | | | | | FOR ENGINEERING SUBMITTAL: | | | CALL OUT PIPE MATERIAL AND SIZE FOR PROPOSED WATER TAP. | | | SHOW PROFILE OF ALL UTILITY CROSSINGS. | | | CONFIRM ALL FRANCHISE UTILITIES ARE SHOWN. | | | MOVE BLOW-UP DETAIL CIRCLE OVER PROPOSED | | | BACKFLOWS/METERS. | | | MOVE METERS OUTSIDE OF SIDEWALK. | | | | | | COMMENTS FROM MARK HURLEY OF PUBLIC UTILITIES CUSTOMER | | | SERVICE AT 561-822-2262 OR [email protected]. | | | -PROPERTY IS PROPOSED TO HAVE MULTIPLE AREAS WITH | | | VARYING WATER USAGE SUCH AS MULTIFAMILY, RETAIL, AND | | | OFFICES. WITH THE WAY THE METERED WATER SERVICES ARE | | | PROPOSED TO BE SETUP, UTILITY BILLING/USAGE WILL BE FOR | | | WHOLE PROPERTY AND NOT CALCULATE THE INDIVIDUAL | | | PORTIONS SEPARATELY. WANTED TO MAKE SURE THAT WAS | | | CONSIDERED BEFORE WATER SERVICES ARE BUILT OUT. | | | | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
3 |
Status |
F |
Date |
08-21-2020 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
08-21-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
08-21-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-08-27 09:35:12 | PLEASE PROVIDE CCTV AS PREVIOUSLY REQUESTED. | | | | | | FOLLOWING COMMENTS FROM MARK HURLEY, PUBLIC UTILITIES, | | | [email protected], 561-822-2262 | | | | | | FOLLOWUP COMMENTS: | | | | | | 4. CUSTOMER SHOULD CONSIDER INSTALLING PARALLEL | | | DOMESTIC BACKFLOW ASSEMBLIES ON THE DOMESTIC LINE TO | | | MINIMIZE WATER OUTAGE DURING BACKFLOW MAINTENANCE. | | | | | | RESPONSE: PLEASE VERIFY IF THIS IS A REQUIREMENT. DUE | | | TO ROOM CONSTRAINTS IT WOULD BE DIFFICULT TO HAVE | | | MULTIPLE BACKFLOWS. | | | | | | -PARALLEL/DUAL INSTALLATION IS NOT A REQUIREMENT ? ONLY | | | A RECOMMENDATION BY THE UTILITY. CUSTOMER MAY UTILIZE | | | SINGULAR BACKFLOW ASSEMBLY. | | | | | | NEW COMMENTS: | | | | | | -DURING FORMAL ENGINEERING SUBMITTAL, CLARIFY ON WATER | | | PLAN IF 10?U.E. AT SOUTH SIDE OF PROPERTY CURVES AND | | | CONTINUE NORTH ON THE EAST SIDE OF PROPERTY. IF SO, | | | PLEASE ADD LABEL ON EAST SIDE. | | | | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
F |
Date |
07-07-2020 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
07-07-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
07-07-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-07-07 09:15:49 | PLEASE UPDATE CIVIL PLANS TO REFLECT RESPONSES IN | | | RESPONSE LETTER DATED 12/13/19. | | | PLEASE COORDINATE PLACEMENT OF WATER METERS/BACKFLOW | | | PREVENTION ETC. WITH MARK HURLEY OF PUBLIC UTILITIES | | | CUSTOMER SERVICE AT 561-822-2262 OR [email protected]. | | | | | | FOLLOWING COMMENTS ARE FROM HONG XU, PROJECT ENGINEER, | | | PUBLIC UTILITIES, 561-494-1097, [email protected]: | | | PLEASE PROVIDE CHANGE OF LEVEL OF SERVICE CALCULATION. | | | CHANGE THE SCALE TO MAKE SURE ALL THE EXISTING | | | UTILITIES (WATER, SEWER, STORM AND DRY UTILITIES) ARE | | | SHOWN IN THE PLAN, THE PIPE SIZE AND MATERIAL ARE | | | CALLED OUT. | | | | | | | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
12-05-2019 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
12-05-2019 |
Time |
|
Rev Time |
4.00 |
| Received By |
rrossano |
Date |
12-05-2019 |
Time |
|
Sent To |
|
|
| Notes |
| 2019-12-05 12:12:14 | PROVIDE CALCULATIONS ON PLANS OF EXISTING AND PROPOSED | | | DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM AND PEAK) | | | AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE PER FAC | | | 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER. | | | | | | PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND STORM | | | DRAINAGE LINES ALONG ENTIRE PROJECT FRONTAGE. | | | | | | PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY OF | | | WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC RIGHT | | | OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF YOUR | | | PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE | | | MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL | | | IN THE WPB ENGINEERING SERVICES DEPARTMENT AT | | | [email protected] OR 561-494-1079 FOR FURTHER | | | ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION | | | ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD | | | SURVEY, POT-HOLING, SOFT DIGS ETC. | | | | | | AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH | | | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, | | | STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR | | | MORE INFORMATION, REFER TO THE LINK BELOW: | | | HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI | | | CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL | | | | | | PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS OF | | | ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES, | | | INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND | | | SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES, | | | METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE | | | SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING | | | GRADES, PIPES SIZES, MATERIALS, ELEVATIONS, | | | ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL | | | INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER | | | LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE | | | PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN | | | VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. | | | ADDITIONALLY, PLAN VIEW SHALL SHOW ALL EXISTING AND | | | PROPOSED UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER | | | OPTIC, ELECTRIC, GAS, AND CABLEVISION & | | | TELECOMMUNICATION FACILITIES LOCATED ON THE | | | RIGHT-OF-WAY. | | | | | | PLEASE LABEL CENTREPARK DR. E. | | | | | | CITY GIS SHOWS CONTINUOUS 12 IN. DIP WATER MAIN ALONG | | | CENTREPARK DR. E. PLANS SHOW EXISTING 8 IN. STUB OUT, | | | BUT OUR FILES DO NOT REFLECT AN 8 IN. STUB OUT. PLEASE | | | CLARIFY PROPOSED WATER CONNECTION. | | | | | | PROPOSED CURB WILL ENCROACH ON EXISTING SANITARY | | | MANHOLE. AS SUCH, POINT OF SERVICE WILL BE EXISTING | | | MANHOLE IN CENTREPARK DR. CONSIDER RUNNING PROPOSED | | | SANITARY SERVICE TO EXISTING MANHOLE INSTEAD OF | | | PROPOSED NEW MANHOLE. | | | | | | PLEASE CLEARLY SHOW CITY RIGHTS OF WAY. | | | | | | PROVIDE PROFILE AND CLEARANCES AT ALL UTILITY | | | CROSSINGS. | | | | | | SHOW VERTICAL DATUM AND DATUM CONVERSION INFORMATION | | | (NAVD 88 AND NGVD 29). | | | | | | CUT AND CAP UTILITIES NOT IN USE, AND REMOVE ANY | | | ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY | | | RIGHT OF WAY. | | | | | | PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE | | | DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB | | | DEVELOPMENT APPLICATION). | | | | | | PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND | | | IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED | | | AREAS. | | | | | | ADJUST PROPOSED METER PLACEMENT TO BE WITHIN EASEMENT; | | | BACKFLOWS TO BE ON PRIVATE PROPERTY OUTSIDE OF | | | EASEMENT. | | | | | | PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR | | | PROPOSED SANITARY LATERALS. | | | | | | PROVIDE ENLARGED DETAIL ON PLANS OF PROPOSED LOCATION | | | OF WATER METER AND BACKFLOW PREVENTION. | | | | | | PLEASE LABEL ALL POINTS OF SERVICE. | | | | | | THE FOLLOWING COMMENTS ARE PER MARK HURLEY, PUBLIC | | | UTILITIES CUSTOMER SERVICE SUPERVISOR, 561-822-2262 OR | | | [email protected] | | | | | | -LOOKS LIKE WATER SERVICE PIPING LOCATED ON AND RUNNING | | | THROUGH OTHER PRIVATE PROPERTY. COULD BE LEGALLY | | | PROBLEMATIC IF OTHER PROPERTY OWNER DOES NOT WANT IT | | | THERE. RECOMMEND NOT DOING THAT. | | | | | | -LOOKS LIKE CUSTOMER PROPOSED PAVER BRICK COMING INTO | | | ROW -> NOT SURE IF CUSTOMER ALLOWED TO BUILD INTO ROW. | | | | | | -LOOKS LIKE CUSTOMER PROPOSED PAVER BRICK BEING BUILT | | | WITHIN EXISTING 10? UE ALONG EDGES OF PROPERTY. WOULD | | | CREATE USABILITY CONFLICT WITH UE. SOLUTION COULD BE TO | | | RELOCATE BRICKWORK BACK AND KEEP AREA GRASSED. | | | | | | -CUSTOMER SHOULD CONSIDER INSTALLING PARALLEL DOMESTIC | | | BACKFLOW ASSEMBLIES ON THE DOMESTIC LINE TO MINIMIZE | | | WATER OUTAGE DURING BACKFLOW MAINTENANCE. | | | | | | -THERE ARE SOME EXISTING TREES IN AREA. TREES SHOULD | | | NOT BE LOCATED WITHIN 5? OF WATER SERVICE PIPING. | | | | | | -IF DOMESTIC METER IS 3? OR GREATER, SHOULD BE | | | INSTALLED ABOVE-GROUND. | | | | | | -ALL OF WATER METER NEEDS TO BE IN ROW OR UE. | | | | | | -EXISTING WATER UTILITIES NOT SHOWN CLEARLY. SHOULD | | | HAVE SEPARATE UTILITY PLAN SHEET HIGHLIGHTING EXISTING | | | UTILITIES, AND AN ENLARGED/ZOOMED-IN AREA PLAN OF THE | | | WATER SERVICES IN DETAIL. | | | | | | -CANNOT FIGURE OUT WHERE THE RETAIL IS LOCATED -> | | | SHOULD LABEL ON PLAN. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | | | | RICK ROSSANO, PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 (MAILING ADDRESS: P.O. BOX | | | 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1098 FAX: | | | (561) 494-1116 MOBILE: (561) 246-9525 | | | EMAIL: [email protected] WWW.WPB.ORG/ENGINEERING | | | | | | MANNY GONZALEZ, SENIOR ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 (MAILING ADDRESS: P.O. BOX | | | 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 MOBILE: (561) 644-7301 EMAIL: | | | [email protected] WWW.WPB.ORG/ENGINEERING | | | | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
12-06-2019 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
12-06-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
12-06-2019 |
Time |
15:18 |
Sent To |
|
|
| Notes |
| 2019-12-06 15:35:00 | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, | | | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM | | | BEACH FIRE RESCUE. | | | | | | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE | | | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. | | | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS | | | ARE SUBMITTED FOR PERMIT. | | | | | | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE | | | PROPOSED PROJECT. | | | | | | 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY | | | WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE | | | PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A | | | PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED | | | TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN | | | STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY | | | MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER | | | PROTECTION. | | | | | | 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY | | | IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING | | | ALL CONSTRUCTION ACTIVITIES. | | | | | | 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM | | | ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION. | | | ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND | | | AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT | | | WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS. | | | | | | 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE | | | REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE | | | ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS. | | | | | | 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH | | | THE 6TH EDITION OF THE FLORIDA FIRE PREVENTION CODE, | | | INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES. | | | | | | 6. ALL PARKING STRUCTURES SHALL COMPLY WITH NFPA 88A, | | | PARKING STRUCTURES AND NFPA 101, THE LIFE SAFETY CODE, | | | INCLUDING MORE SPECIFICALLY, CHAPTER 42 STORAGE | | | OCCUPANCIES (PARKING STRUCTURES) | | | | | | 7. A NFPA 13 COMPLAINT FIRE SPRINKLER SYSTEM AND NFPA | | | 14 COMPLIANT WET STANDPIPE SYSTEM ARE REQUIRED FOR THIS | | | STRUCTURE. TEMPORARY STANDPIPES ARE REQUIRED WHEN THE | | | BUILDING REACHES THREE LEVELS OR THIRTY FEET WHILE | | | BEING CONSTRUCTED. | | | | | | SEPARATE SHOP DRAWINGS, ARE REQUIRED TO BE SUBMITTED, | | | REVIEWED AND APPROVED BY THE FIRE PREVENTION BUREAU | | | PRIOR TO ANY INSTALLATION. | | | | | | IT IS RECOMMENDED FOR HIGH RISES HAVE TWO SEPARATE FDC | | | LOCATIONS REMOTELY LOCATED. | | | | | | 7A. PER NFPA 14 | | | | | | 6.4.5.4* FIRE DEPARTMENT CONNECTIONS SHALL BE LOCATED | | | NOT MORE THAN 100 FT (30.5 M) FROM THE NEAREST FIRE | | | HYDRANT CONNECTED TO AN APPROVED WATER SUPPLY. | | | | | | | | | 7B. PLEASE REVIEW THE DISTANCE SEPARATION OF THE | | | STAIRWELLS AS THE SEPARATION DISTANCE IS NOT INDICATED. | | | | | | 7.3.2.2* WHERE THE MOST REMOTE PORTION OF A | | | NON-SPRINKLERED FLOOR OR STORY IS LOCATED IN EXCESS OF | | | 150 FT (45.7 M) OF TRAVEL DISTANCE FROM A HOSE | | | CONNECTION IN OR ADJACENT TO A REQUIRED EXIT OR THE | | | MOST REMOTE PORTION OF A SPRINKLERED FLOOR OR STORY | | | IS LOCATED IN EXCESS OF 200 FT (61 M) OF TRAVEL | | | DISTANCE FROM A HOSE CONNECTION IN OR ADJACENT TO A | | | REQUIRED EXIT, ADDITIONALHOSE CONNECTIONS SHALL BE | | | PROVIDED, IN APPROVED LOCATIONS, WHERE REQUIRED BY THE | | | LOCAL FIRE DEPARTMENT OR THE AHJ. | | | | | | | | | 7C. PER NFPA 1 | | | | | | 18.3 WATER SUPPLIES. | | | | | | 18.3.1* AN APPROVED WATER SUPPLY CAPABLE OF SUPPLYING | | | THE REQUIRED FIRE FLOW FOR FIRE PROTECTION SHALL BE | | | PROVIDED TO ALL PREMISES UPON WHICH FACILITIES, | | | BUILDINGS, OR PORTIONS OF BUILDINGS ARE HEREAFTER | | | CONSTRUCTED OR MOVED INTO THE JURISDICTION. THE | | | APPROVED WATER SUPPLY SHALL BE IN ACCORDANCE WITH | | | SECTION 18.4. | | | | | | PER FLORIDA ADMINISTRATIVE CODE SECTION 61G15-32.004, | | | FIRE PROTECTION ENGINEERING DOCUMENTS SHALL INCLUDE THE | | | POINT OF SERVICE FOR THE WATER SUPPLY, A LIST OF | | | APPLICABLE NFPA STANDARDS APPLICABLE TO THE PROJECT, | | | CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR | | | AREA, SUPPRESSION SYSTEM TYPE, DESIGN DENSITIES, WATER | | | SUPPLY DATA (FIRE PUMP DATA, HYDRANT FLOW TEST DATA) | | | AND ANY PERFORMANCE BASED INFORMATION SUCH AS | | | PRE-ENGINEERED SYSTEMS. | | | FOR THE PROPOSED FIRE PUMP(S) , WHAT IS(ARE) THE | | | PRIMARY AND SECONDARY POWER SOURCES? | | | | | | | | | 7D. THE LOCATION OF THE DDCC FIRE LINE LOCATION SHALL | | | MEET THE REQUIREMENTS OF NFPA 24 AND SHALL BE | | | COORDINATED WITH THE OFFICE OF FIRE MARSHAL, THE CITY'S | | | ENGINEERS OFFICE, THE LANSCAPE PLANNER, AND THE CITY'S | | | PLANNING AND ZONING OFFICE. | | | | | | | | | 8. A CLASS ?A? NFPA 72 COMPLIANT MONITORED FIRE ALARM | | | SYSTEM IS REQUIRED FOR THIS STRUCTURE. SEPARATE SHOP | | | DRAWINGS, ARE REQUIRED TO BE SUBMITTED, REVIEWED AND | | | APPROVED BY THE FIRE PREVENTION BUREAU PRIOR TO ANY | | | INSTALLATION. | | | | | | 9. ALL ELEVATORS SHALL BE EQUIPPED WITH A REGION 7 | | | KEYWAY SYSTEM. | | | | | | ALL NEW ELEVATORS SHALL CONFORM TO THE FIRE FIGHTER?S | | | EMERGENCY OPERATIONS REQUIREMENTS OF ASME A17.1/CSA | | | B44, SAFETY CODE FOR ELEVATORS. | | | | | | ANY BUILDING THAT IS MORE THAN THREE STORIES HIGH OR IN | | | WHICH THE VERTICAL DISTANCE BETWEEN THE BOTTOM TERMINAL | | | LANDING AND THE TOP TERMINAL LANDING EXCEEDS 25 FEET | | | MUST BE CONSTRUCTED TO CONTAIN AT LEAST ONE PASSENGER | | | ELEVATOR THAT IS OPERATIONAL AND WILL ACCOMMODATE AN | | | AMBULANCE STRETCHER 76 INCHES LONG AND 24 INCHES WIDE | | | IN THE HORIZONTAL POSITION. | | | | | | 10. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL | | | BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL | | | DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS, | | | EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A | | | PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE | | | SAFETY FEATURES AND EQUIPMENT. | | | | | | 11. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED | | | ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF | | | FIRE PREVENTION. | | | | | | ALL NEW FIRE HYDRANTS AND FDC?S PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLOSELY COORDINATED WITH THE | | | BUREAU OF FIRE PREVENTION. PROPOSED FIRE HYDRANTS AND | | | FDC?S SHOULD BE LOCATED ON THE SAME SIDE OF THE STREET | | | OR ACCESS ROADWAY TO ALLOW FREE ACCESS FOR OTHER | | | ARRIVING EMERGENCY VEHICLES. | | | | | | 12. COMMAND ROOM | | | THE FIRE COMMAND CENTER SHALL COMPLY WITH NFPA 1, | | | CHAPTER 11, BUILDING SERVICES; 11.9 AND SHALL CONTAIN | | | THE FOLLOWING FEATURES: | | | A. SHALL BE A MINIMUM OF 200 FT SQUARED WITH A MINIMUM | | | DIMENSION OF 10 FT. | | | B. THE FIRE DEPARTMENT COMMUNICATIONS SYSTEM. | | | C. A TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED | | | ACCESS TO THE PUBLIC TELEPHONE SYSTEM | | | D. SCHEMATIC BUILDING PLANS INDICATING THE TYPICAL | | | FLOOR PLAN AND DETAILING THE BUILDING CORE, MEANS OF | | | EGRESS, FIRE PROTECTION SYSTEMS, FIRE-FIGHTING | | | EQUIPMENT AND FIRE DEPARTMENT ACCESS AND THE LOCATION | | | OF FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE | | | BARRIERS AND SMOKE PARTITIONS | | | E. A WORK TABLE. | | | F. IF APPLICABLE, A HAZARDOUS MATERIAL MANAGEMENT PLAN | | | FOR THE BUILDING. | | | G. THE EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM | | | CONTROL UNIT. | | | H. ANNUNCIATOR UNIT VISUALLY INDICATING THE LOCATION OF | | | THE ELEVATORS AND WHETHER THEY ARE OPERATIONAL | | | I. STATUS INDICATORS AND CONTROLS FOR AIR DISTRIBUTION | | | SYSTEMS. | | | J. CONTROLS FOR UNLOCKING STAIRWAY DOORS SIMULTANEOUSLY | | | K. SPRINKLER VALVE AND WATER FLOW DETECTOR DISPLAY | | | PANELS | | | L. EMERGENCY AND STANDBY POWER STATUS INDICATORS | | | M. FIRE PUMP STATUS INDICATORS | | | N. GENERATOR SUPERVISION DEVICES AND MANUAL START AND | | | TRANSFER FEATURES. | | | O. PUBLIC ADDRESS SYSTEM, WHERE SPECIFICALLY REQUIRED | | | BY OTHER SECTIONS OF THIS CODE | | | P. CONTROLS REQUIRED FOR SMOKE CONTROL | | | Q. ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME | | | A17.1. | | | R. ELEVATOR EMERGENCY OR STANDBY POWER SELECTOR | | | SWITCH(ES), WHERE EMERGENCY OR STANDBY POWER IS | | | PROVIDED | | | 11.8.6* EMERGENCY COMMAND CENTER. | | | 11.8.6.1 AN EMERGENCY COMMAND CENTER SHALL BE PROVIDED | | | IN A | | | LOCATION APPROVED BY THE FIRE DEPARTMENT. | | | 11.8.6.2 THE EMERGENCY COMMAND CENTER SHALL CONTAIN THE | | | FOLLOWING: | | | (1) VOICE FIRE ALARM SYSTEM PANELS AND CONTROLS | | | (2) FIRE DEPARTMENT TWO-WAY TELEPHONE COMMUNICATION | | | SERVICE | | | PANELS AND CONTROLS WHERE REQUIRED BY ANOTHER SECTION | | | OF THIS | | | CODE | | | (3) FIRE DETECTION AND FIRE ALARM SYSTEM ANNUNCIATION | | | PANELS | | | (4) ELEVATOR FLOOR LOCATION AND OPERATION ANNUNCIATORS | | | (5) ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME | | | A17.1/CSA B44, SAFETY CODE FOR ELEVATORS AND ESCALATORS | | | (6) ELEVATOR EMERGENCY POWER SELECTOR SWITCH(ES) WHERE | | | PROVIDED | | | IN ACCORDANCE WITH ASME A17.1/CSA B44 | | | (7) SPRINKLER VALVE AND WATERFLOW ANNUNCIATORS | | | (8) EMERGENCY GENERATOR STATUS INDICATORS | | | (9) CONTROLS FOR ANY AUTOMATIC STAIRWAY DOOR UNLOCKING | | | SYSTEM | | | (10) FIRE PUMP STATUS INDICATORS | | | (11) TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED | | | ACCESS TO THE | | | PUBLIC TELEPHONE SYSTEM | | | (12) STAIRWAY VIDEO MONITORING EQUIPMENT AS REQUIRED BY | | | 11.8.8 | | | | | | | | | 12A. THE COMMAND ROOM IS INDICATED IN A LOCATION REMOTE | | | FROM THE FIRE PUMP ROOM AND WITH NO DIRECT ACCESS TO | | | THE LOBBY. | | | | | | PLEASE REVIEW AND COORDINATE WITH THE OFFICE OF THE | | | FIRE MARSHAL TO PROVIDE A LOCATION CLOSER TO THE FIRE | | | PUMP ROOM AND HAVE ACCESS TO THE LOBBY EVEN IF TWO | | | DOORS ARE NEEDED. | | | | | | | | | 13. RADIO | | | NFPA 1, CHAPTER 11, BUILDING SERVICES; 11.10 TWO-WAY | | | RADIO ENHANCEMENT SERVICES. | | | 11.10.1 IN ALL NEW AND EXISTING BUILDINGS, MINIMUM | | | RADIO SIGNAL STRENGTH FOR FIRE DEPARTMENT | | | COMMUNICATIONS SHALL BE MAINTAINED AT A LEVEL | | | DETERMINED BY THE AHJ. | | | NFPA 72, 24.5.2* TWO-WAY RADIO COMMUNICATIONS | | | ENHANCEMENT SYSTEMS. | | | 24.5.2.2 RADIO COVERAGE. RADIO COVERAGE SHALL BE | | | PROVIDED THROUGHOUT THE BUILDING AS A PERCENTAGE OF | | | FLOOR AREA AS SPECIFIED IN 24.5.2.2.1 THROUGH | | | 24.5.2.2.3. | | | 24.5.2.2.1 CRITICAL AREAS. CRITICAL AREAS, SUCH AS THE | | | EMERGENCY COMMAND CENTER(S), THE FIRE PUMP ROOM(S), | | | EXIT STAIRS, EXIT PASSAGEWAYS, ELEVATOR LOBBIES, | | | STANDPIPE CABINETS, SPRINKLER SECTIONAL VALVE | | | LOCATIONS, AND OTHER AREAS DEEMED CRITICAL BY THE | | | AUTHORITY HAVING JURISDICTION, SHALL BE PROVIDED WITH | | | 99 PERCENT FLOOR AREA RADIO COVERAGE. | | | 24.5.2.2.2 GENERAL BUILDING AREAS. GENERAL BUILDING | | | AREAS SHALL BE PROVIDED WITH 90 PERCENT FLOOR AREA | | | RADIO COVERAGE. | | | 24.5.2.3 SIGNAL STRENGTH. | | | 24.5.2.3.1 INBOUND. A MINIMUM INBOUND SIGNAL STRENGTH | | | OF -95 DBM, OR OTHER SIGNAL STRENGTH AS REQUIRED BY THE | | | AUTHORITY HAVING JURISDICTION, SHALL BE PROVIDED | | | THROUGHOUT THE COVERAGE AREA. | | | 24.5.2.3.2 OUTBOUND. A MINIMUM OUTBOUND SIGNAL STRENGTH | | | OF -95 DBM AT THE DONOR SITE, OR OTHER SIGNAL STRENGTH | | | AS REQUIRED BY THE AUTHORITY HAVING JURISDICTION, SHALL | | | BE PROVIDED FROM THE COVERAGE AREA. | | | | | | THE SYSTEM SHALL MAINTAIN A MINIMUM RADIO SIGNAL | | | STRENGTH OF -95 DBM FOR THE RADIO SYSTEM USED BY WEST | | | PALM BEACH FIRE RESCUE. TESTING SHALL BE BY AN | | | ACCEPTABLE NATIONAL STANDARD DOCUMENTING PERCENTAGES | | | NOTED ABOVE AND BY ACTUAL RADIO TESTING BY FIRE | | | PERSONNEL. IF THE MINIMUM CANNOT BE MAINTAINED, A | | | BI-DIRECTIONAL AMPLIFIED SYSTEM SHALL BE INSTALLED WITH | | | A MINIMUM 2-HOUR RUN TIME BATTERY BACK-UP. | | | | | | 14. KNOX-BOX KEY SYSTEM SHALL BE REQUIRED FOR THIS | | | BUILDING. | | | ANY GATES SHALL BE PROVIDED WITH KNOX KEY ACCESS LOCKS, | | | PADLOCKS AND/OR SWITCHES FOR 24 HOUR EMERGENCY ACCESS. | | | | | | 15. THE SMOKE CONTROL SYSTEM SHALL COMPLY WITH NFPA | | | 101, CHAPTER 9, BUILDING SERVICE AND FIRE PROTECTION | | | EQUIPMENT, INCLUDING: | | | THE SMOKE CONTROL SYSTEMS SHALL BE INSTALLED, | | | INSPECTED, TESTED, AND MAINTAINED IN ACCORDANCE WITH | | | NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS; NFPA 204, | | | STANDARD FOR SMOKE AND HEAT VENTING; OR NATIONALLY | | | RECOGNIZED STANDARDS, ENGINEERING GUIDES, OR | | | RECOMMENDED PRACTICES, AS APPROVED BY THE AUTHORITY | | | HAVING JURISDICTION. | | | THE ENGINEER OF RECORD SHALL CLEARLY IDENTIFY THE | | | INTENT OF THE SYSTEM, THE DESIGN METHOD USED, THE | | | APPROPRIATENESS OF THE METHOD USED, AND THE REQUIRED | | | MEANS OF INSPECTING, TESTING, AND MAINTAINING THE | | | SYSTEM. | | | ACCEPTANCE TESTING SHALL BE PERFORMED BY A SPECIAL | | | INSPECTOR IN ACCORDANCE WITH SECTION 9.9. | | | | | | 16. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT | | | DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | 17. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING | | | PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH | | | THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
4 |
Status |
P |
Date |
11-16-2020 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
11-16-2020 |
Time |
13:41 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
11-16-2020 |
Time |
13:41 |
Sent To |
|
|
| Notes |
| 2020-11-16 13:42:23 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 1885 CENTREPARK Z19110010 | | | NOVEMBER 16, 2020 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE | | | TREES IN GOOD CONDITION TO BE PRESERVED ON SITE OR | | | RELOCATED. ANSI A 300 (PART 5) STANDARDS SPECIFY | | | EXAMPLES OF SUITABILITY RATINGS OF GOOD, MODERATE, OR | | | POOR FOR RELOCATION. PROVIDE CONDITION AND RELOCATION | | | POTENTIAL FOR THE SEVEN LIVE OAKS, ONE GUMBO LIMBO, AND | | | ONE SILVER BUTTONWOOD LISTED IN THE TREE DISPOSITION | | | PLAN. | | | CONDITION NOT LISTED FOR THE REFERENCED NATIVE TREES. | | | CONDITIONS OF TREES ARE LISTED BUT STAFF REQUESTS THE | | | QUALIFIED ARBORISTS REPORT WITH THE REFERENCED ANSI A | | | 300 (PART 5) TREE RELOCATION STANDARDS USED. | | | | | | 2. SATISFIED. ON THE LANDSCAPE REQUIREMENTS CHART, | | | CORRECT THE SITE LANDSCAPE CALCULATIONS TO SHOW THE | | | SHADE TREE AND FLOWERING TREE CALCULATIONS BASED ON 40 | | | PERCENT REQUIRED OPEN SPACE PER CPD ZONING, AND THEN | | | ADD THE MULTIFAMILY 220 TREES TO ACHIEVE THE TOTAL | | | TREES REQUIRED. THEN SHOW PROVIDED NUMBER OF TREES ON | | | SITE. ONCE ANY TREE PLANTING PLAN FOR THE POA PARCELS | | | HAS BEEN FINALIZED AND SUBMITTED FOR REVIEW, THE FINAL | | | COUNT OF DEFICIENT TREES SHALL BE DETERMINED. | | | CORRECT CALCULATIONS AS REQUESTED TO ONLY SHOW REQUIRED | | | TREE CALCULATIONS. IN THE PROVIDED SECTION SHOW TOTAL | | | TREES AND QUALIFYING PALMS FOR ONSITE INCLUDING | | | ROOFTOP. SHOW NUMBER OF TREES DEFICIENT AND TOTAL | | | PROVIDED FOR STREETSCAPE AND OFFSITE PROVIDED TO OFFSET | | | THE DEFICIENT NUMBER. | | | | | | CALCULATIONS CAN BE SIMPLIFIED TO BE CLEAR. REQUIRED | | | SHADE TREE NUMBER IS 27, REQUIRED FLOWERING TREES IS 7, | | | AND MULTIFAMILY IS 220. TOTAL REQUIRED IS 254. | | | PROVIDED APPEARS TO BE ON SITE 66, ROOFTOP 6, | | | STREETSCAPE 36, AND POA PROPERTY 19. | | | TOTAL IS 127. THIS LEAVES A DEFICIT OF 127 TREES. | | | THE OFFSITE PARKING LOT IS 6 NEW TREES, BUT THERE IS | | | MITIGATION REQUIRED AND POSSIBLY MISSING REQUIRED TREES | | | ON THAT PARCEL. ANY TREES ABOVE THE REQUIRED MAY BE | | | COUNTED AS ?EXTRA? AND PROPOSED TO BE APPLIED TOWARD | | | THE WAIVED NUMBER OF TREES. | | | PAYMENT IN LIEU IS AN OPTION FOR THE WAIVED TREES. | | | | | | 3. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L. | | | PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT | | | MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT | | | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE | | | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH | | | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH | | | FLORIDA LANDSCAPES BY SHOWING THE ACTUAL PERCENTAGE. | | | NUMBER OF QUALIFYING PLANTS SHOWN, BUT STILL NEED | | | PERCENTAGE LISTED. | | | | | | 4. SATISFIED. PLEASE SHOW LOCATIONS OF WATER, SEWER, | | | FIRE LINES, DRAINAGE LINES AND FPL TRANSFORMERS ON THE | | | LANDSCAPE PLAN AND RESOLVE CONFLICTS WITH LANDSCAPING | | | WHEN CIVIL DRAWINGS ARE FINALIZED. | | | CONFLICTS WITH REQUIRED LANDSCAPING STILL EXIST. | | | | | | WILL VERIFY FINAL DESIGN LOCATIONS PRIOR TO FINAL | | | APPROVAL. | | | | | | 5. SATISFIED. GREEN BUTTONWOOD TREES AND ROYAL PALMS | | | SHOWN IN THE PAVED PLAZA AREAS NEED TO HAVE STRUCTURAL | | | SOIL OR SOIL CELLS UNDER THE PAVED AREA TO ALLOW FOR | | | ROOT DEVELOPMENT. PROVIDE LOCATIONS AND CROSS SECTION | | | DETAIL FOR THE TYPE SELECTED. | | | | | | 6. SATISFIED. SHOW THE LOCATIONS OF ALL SITE LIGHTING | | | ON THE LANDSCAPE PLAN AND RESOLVE ANY CONFLICTS WITH | | | TREES. | | | | | | 7. SATISFIED. SHOW THE OFFSITE TREES RELATED TO THE | | | RECONFIGURATION OF THE EXISTING PARKING AREA AS A | | | SEPARATE PLAN AND PLANT LIST. ADDRESS ALL MISSING | | | PARKING AREA TREES IN TERMINAL ISLANDS. | | | THIS IS A SEPARATE PARCEL, SO WILL REQUIRE AND | | | AMENDMENT TO THAT PARCEL?S APPROVED SITE PLAN AND | | | LANDSCAPE PLAN. PLACEMENT OF UTILITY LINES FOR THE | | | PROPOSED SITE WITHIN THIS PARKING AREA CREATES | | | NONCONFORMING LANDSCAPE AREAS BY DISPLACING REQUIRED | | | TREES. | | | SEPARATE PLAN NEEDS TO BE SUBMITTED. | | | THE FIRE AND WATER SUPPLY LINES AND BACKFLOWS ARE | | | PROPOSED OFF SITE IN A REQUIRED PARKING LOT LANDSCAPE | | | AREA. PROVIDE A SEPARATE PLAN SHOWING THE LANDSCAPING | | | MEETING CODE REQUIREMENTS FOR THE OFFSITE PARKING AREA. | | | | | | SIDEWALKS ADDED THROUGH THE TERMINAL AND INTERIOR | | | LANDSCAPE ISLANDS INCREASE OR CREATE NONCONFORMITIES. | | | THESE AREAS MUST REMAIN UNALTERED OR BECOME MORE | | | CONFORMING. THE DIFFERENCE IN LANDSCAPE AREA SQUARE | | | FOOTAGE MUST ALSO BE SHOWN. IF IT STAYS THE SAME OR IS | | | INCREASED EVEN SLIGHTLY, NO FURTHER ACTION WOULD BE | | | REQUIRED. | | | | | | RESOLUTION NO. 97-17 | | | | | | 8. ONGOING. PER EXHIBIT F, APPROVAL FROM THE | | | ARCHITECTURAL REVIEW BOARD MUST BE PROVIDED FOR THE | | | LANDSCAPE AND IRRIGATION PROPOSED. | | | FINAL PLAN MUST BE APPROVED. | | | IT MUST BE VERIFIED THAT THE POA WILL ACCEPT AND | | | MAINTAIN THE LANDSCAPING AND TREES ADDED TO THE COMMON | | | AREAS. | | | | | | 9. SATISFIED. SHOW LOCATION OF PUMP EQUIPMENT AND | | | SOURCE FOR THE IRRIGATION SYSTEM TO MEET CONDITION #11 | | | REQUIRING USE OF SURFACE WATER FROM LAKES. | | | COULD NOT LOCATE NOTE OR CALL OUT FOR IRRIGATION PUMP | | | ON LANDSCAPE PLAN. | | | COMMENT RESPONSE WAS NOT CLEAR. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
3 |
Status |
F |
Date |
08-27-2020 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
08-27-2020 |
Time |
15:21 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
08-27-2020 |
Time |
15:21 |
Sent To |
|
|
| Notes |
| 2020-08-27 15:21:49 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 1885 CENTREPARK Z19110010 | | | AUGUST 27, 2020 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. PARTIALLY SATISFIED. SECTION 94-448 (D)(3) REQUIRES | | | NATIVE TREES IN GOOD CONDITION TO BE PRESERVED ON SITE | | | OR RELOCATED. ANSI A 300 (PART 5) STANDARDS SPECIFY | | | EXAMPLES OF SUITABILITY RATINGS OF GOOD, MODERATE, OR | | | POOR FOR RELOCATION. PROVIDE CONDITION AND RELOCATION | | | POTENTIAL FOR THE SEVEN LIVE OAKS, ONE GUMBO LIMBO, AND | | | ONE SILVER BUTTONWOOD LISTED IN THE TREE DISPOSITION | | | PLAN. | | | CONDITION NOT LISTED FOR THE REFERENCED NATIVE TREES. | | | CONDITIONS OF TREES ARE LISTED BUT STAFF REQUESTS THE | | | QUALIFIED ARBORISTS REPORT WITH THE REFERENCED ANSI A | | | 300 (PART 5) TREE RELOCATION STANDARDS USED. | | | | | | 2. PARTIALLY SATISFIED. ON THE LANDSCAPE REQUIREMENTS | | | CHART, CORRECT THE SITE LANDSCAPE CALCULATIONS TO SHOW | | | THE SHADE TREE AND FLOWERING TREE CALCULATIONS BASED ON | | | 40 PERCENT REQUIRED OPEN SPACE PER CPD ZONING, AND THEN | | | ADD THE MULTIFAMILY 220 TREES TO ACHIEVE THE TOTAL | | | TREES REQUIRED. THEN SHOW PROVIDED NUMBER OF TREES ON | | | SITE. ONCE ANY TREE PLANTING PLAN FOR THE POA PARCELS | | | HAS BEEN FINALIZED AND SUBMITTED FOR REVIEW, THE FINAL | | | COUNT OF DEFICIENT TREES SHALL BE DETERMINED. | | | CORRECT CALCULATIONS AS REQUESTED TO ONLY SHOW REQUIRED | | | TREE CALCULATIONS. IN THE PROVIDED SECTION SHOW TOTAL | | | TREES AND QUALIFYING PALMS FOR ONSITE INCLUDING | | | ROOFTOP. SHOW NUMBER OF TREES DEFICIENT AND TOTAL | | | PROVIDED FOR STREETSCAPE AND OFFSITE PROVIDED TO OFFSET | | | THE DEFICIENT NUMBER. | | | | | | CALCULATIONS CAN BE SIMPLIFIED TO BE CLEAR. REQUIRED | | | SHADE TREE NUMBER IS 27, REQUIRED FLOWERING TREES IS 7, | | | AND MULTIFAMILY IS 220. TOTAL REQUIRED IS 254. | | | PROVIDED APPEARS TO BE ON SITE 66, ROOFTOP 6, | | | STREETSCAPE 36, AND POA PROPERTY 19. | | | TOTAL IS 127. THIS LEAVES A DEFICIT OF 127 TREES. | | | THE OFFSITE PARKING LOT IS 6 NEW TREES, BUT THERE IS | | | MITIGATION REQUIRED AND POSSIBLY MISSING REQUIRED TREES | | | ON THAT PARCEL. ANY TREES ABOVE THE REQUIRED MAY BE | | | COUNTED AS ?EXTRA? AND PROPOSED TO BE APPLIED TOWARD | | | THE WAIVED NUMBER OF TREES. | | | PAYMENT IN LIEU IS AN OPTION FOR THE WAIVED TREES. | | | | | | 3. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L. | | | PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT | | | MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT | | | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE | | | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH | | | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH | | | FLORIDA LANDSCAPES BY SHOWING THE ACTUAL PERCENTAGE. | | | NUMBER OF QUALIFYING PLANTS SHOWN, BUT STILL NEED | | | PERCENTAGE LISTED. | | | | | | 4. PARTIALLY SATISFIED. PLEASE SHOW LOCATIONS OF WATER, | | | SEWER, FIRE LINES, DRAINAGE LINES AND FPL TRANSFORMERS | | | ON THE LANDSCAPE PLAN AND RESOLVE CONFLICTS WITH | | | LANDSCAPING WHEN CIVIL DRAWINGS ARE FINALIZED. | | | CONFLICTS WITH REQUIRED LANDSCAPING STILL EXIST. | | | | | | WILL VERIFY FINAL DESIGN LOCATIONS PRIOR TO FINAL | | | APPROVAL. | | | | | | 5. SATISFIED. GREEN BUTTONWOOD TREES AND ROYAL PALMS | | | SHOWN IN THE PAVED PLAZA AREAS NEED TO HAVE STRUCTURAL | | | SOIL OR SOIL CELLS UNDER THE PAVED AREA TO ALLOW FOR | | | ROOT DEVELOPMENT. PROVIDE LOCATIONS AND CROSS SECTION | | | DETAIL FOR THE TYPE SELECTED. | | | | | | 6. SATISFIED. SHOW THE LOCATIONS OF ALL SITE LIGHTING | | | ON THE LANDSCAPE PLAN AND RESOLVE ANY CONFLICTS WITH | | | TREES. | | | | | | 7. PARTIALLY SATISFIED. SHOW THE OFFSITE TREES RELATED | | | TO THE RECONFIGURATION OF THE EXISTING PARKING AREA AS | | | A SEPARATE PLAN AND PLANT LIST. ADDRESS ALL MISSING | | | PARKING AREA TREES IN TERMINAL ISLANDS. | | | THIS IS A SEPARATE PARCEL, SO WILL REQUIRE AND | | | AMENDMENT TO THAT PARCEL?S APPROVED SITE PLAN AND | | | LANDSCAPE PLAN. PLACEMENT OF UTILITY LINES FOR THE | | | PROPOSED SITE WITHIN THIS PARKING AREA CREATES | | | NONCONFORMING LANDSCAPE AREAS BY DISPLACING REQUIRED | | | TREES. | | | SEPARATE PLAN NEEDS TO BE SUBMITTED. | | | THE FIRE AND WATER SUPPLY LINES AND BACKFLOWS ARE | | | PROPOSED OFF SITE IN A REQUIRED PARKING LOT LANDSCAPE | | | AREA. PROVIDE A SEPARATE PLAN SHOWING THE LANDSCAPING | | | MEETING CODE REQUIREMENTS FOR THE OFFSITE PARKING AREA. | | | | | | SIDEWALKS ADDED THROUGH THE TERMINAL AND INTERIOR | | | LANDSCAPE ISLANDS INCREASE OR CREATE NONCONFORMITIES. | | | THESE AREAS MUST REMAIN UNALTERED OR BECOME MORE | | | CONFORMING. THE DIFFERENCE IN LANDSCAPE AREA SQUARE | | | FOOTAGE MUST ALSO BE SHOWN. IF IT STAYS THE SAME OR IS | | | INCREASED EVEN SLIGHTLY, NO FURTHER ACTION WOULD BE | | | REQUIRED. | | | | | | RESOLUTION NO. 97-17 | | | | | | 8. ONGOING. PER EXHIBIT F, APPROVAL FROM THE | | | ARCHITECTURAL REVIEW BOARD MUST BE PROVIDED FOR THE | | | LANDSCAPE AND IRRIGATION PROPOSED. | | | FINAL PLAN MUST BE APPROVED. | | | IT MUST BE VERIFIED THAT THE POA WILL ACCEPT AND | | | MAINTAIN THE LANDSCAPING AND TREES ADDED TO THE COMMON | | | AREAS. | | | | | | 9. NOT SATISFIED. SHOW LOCATION OF PUMP EQUIPMENT AND | | | SOURCE FOR THE IRRIGATION SYSTEM TO MEET CONDITION #11 | | | REQUIRING USE OF SURFACE WATER FROM LAKES. | | | COULD NOT LOCATE NOTE OR CALL OUT FOR IRRIGATION PUMP | | | ON LANDSCAPE PLAN. | | | COMMENT RESPONSE WAS NOT CLEAR. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
F |
Date |
07-07-2020 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
07-07-2020 |
Time |
17:13 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
07-07-2020 |
Time |
17:13 |
Sent To |
|
|
| Notes |
| 2020-07-07 17:13:59 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 1885 CENTREPARK Z19110010 | | | JULY 7, 2020 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. NOT SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE | | | TREES IN GOOD CONDITION TO BE PRESERVED ON SITE OR | | | RELOCATED. ANSI A 300 (PART 5) STANDARDS SPECIFY | | | EXAMPLES OF SUITABILITY RATINGS OF GOOD, MODERATE, OR | | | POOR FOR RELOCATION. PROVIDE CONDITION AND RELOCATION | | | POTENTIAL FOR THE SEVEN LIVE OAKS, ONE GUMBO LIMBO, AND | | | ONE SILVER BUTTONWOOD LISTED IN THE TREE DISPOSITION | | | PLAN. | | | CONDITION NOT LISTED FOR THE REFERENCED NATIVE TREES. | | | | | | 2. PARTIALLY SATISFIED. ON THE LANDSCAPE REQUIREMENTS | | | CHART, CORRECT THE SITE LANDSCAPE CALCULATIONS TO SHOW | | | THE SHADE TREE AND FLOWERING TREE CALCULATIONS BASED ON | | | 40 PERCENT REQUIRED OPEN SPACE PER CPD ZONING, AND THEN | | | ADD THE MULTIFAMILY 220 TREES TO ACHIEVE THE TOTAL | | | TREES REQUIRED. THEN SHOW PROVIDED NUMBER OF TREES ON | | | SITE. ONCE ANY TREE PLANTING PLAN FOR THE POA PARCELS | | | HAS BEEN FINALIZED AND SUBMITTED FOR REVIEW, THE FINAL | | | COUNT OF DEFICIENT TREES SHALL BE DETERMINED. | | | CORRECT CALCULATIONS AS REQUESTED TO ONLY SHOW REQUIRED | | | TREE CALCULATIONS. IN THE PROVIDED SECTION SHOW TOTAL | | | TREES AND QUALIFYING PALMS FOR ONSITE INCLUDING | | | ROOFTOP. SHOW NUMBER OF TREES DEFICIENT AND TOTAL | | | PROVIDED FOR STREETSCAPE AND OFFSITE PROVIDED TO OFFSET | | | THE DEFICIENT NUMBER. | | | | | | 3. PARTIALLY SATISFIED. SHOW COMPLIANCE WITH SECTION | | | 94-445 L. PLANT SPECIES. A MINIMUM OF 60 PERCENT OF | | | PLANT MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT | | | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE | | | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH | | | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH | | | FLORIDA LANDSCAPES BY SHOWING THE ACTUAL PERCENTAGE. | | | NUMBER OF QUALIFYING PLANTS SHOWN, BUT STILL NEED | | | PERCENTAGE LISTED. | | | | | | 4. PARTIALLY SATISFIED. PLEASE SHOW LOCATIONS OF WATER, | | | SEWER, FIRE LINES, DRAINAGE LINES AND FPL TRANSFORMERS | | | ON THE LANDSCAPE PLAN AND RESOLVE CONFLICTS WITH | | | LANDSCAPING WHEN CIVIL DRAWINGS ARE FINALIZED. | | | CONFLICTS WITH REQUIRED LANDSCAPING STILL EXIST. | | | | | | 5. SATISFIED. GREEN BUTTONWOOD TREES AND ROYAL PALMS | | | SHOWN IN THE PAVED PLAZA AREAS NEED TO HAVE STRUCTURAL | | | SOIL OR SOIL CELLS UNDER THE PAVED AREA TO ALLOW FOR | | | ROOT DEVELOPMENT. PROVIDE LOCATIONS AND CROSS SECTION | | | DETAIL FOR THE TYPE SELECTED. | | | | | | 6. SATISFIED. SHOW THE LOCATIONS OF ALL SITE LIGHTING | | | ON THE LANDSCAPE PLAN AND RESOLVE ANY CONFLICTS WITH | | | TREES. | | | | | | 7. PARTIALLY SATISFIED. SHOW THE OFFSITE TREES RELATED | | | TO THE RECONFIGURATION OF THE EXISTING PARKING AREA AS | | | A SEPARATE PLAN AND PLANT LIST. ADDRESS ALL MISSING | | | PARKING AREA TREES IN TERMINAL ISLANDS. | | | THIS IS A SEPARATE PARCEL, SO WILL REQUIRE AND | | | AMENDMENT TO THAT PARCEL?S APPROVED SITE PLAN AND | | | LANDSCAPE PLAN. PLACEMENT OF UTILITY LINES FOR THE | | | PROPOSED SITE WITHIN THIS PARKING AREA CREATES | | | NONCONFORMING LANDSCAPE AREAS BY DISPLACING REQUIRED | | | TREES. | | | SEPARATE PLAN NEEDS TO BE SUBMITTED. | | | THE FIRE AND WATER SUPPLY LINES AND BACKFLOWS ARE | | | PROPOSED OFF SITE IN A REQUIRED PARKING LOT LANDSCAPE | | | AREA. PROVIDE A SEPARATE PLAN SHOWING THE LANDSCAPING | | | MEETING CODE REQUIREMENTS FOR THE OFFSITE PARKING AREA. | | | | | | RESOLUTION NO. 97-17 | | | | | | 8. ONGOING. PER EXHIBIT F, APPROVAL FROM THE | | | ARCHITECTURAL REVIEW BOARD MUST BE PROVIDED FOR THE | | | LANDSCAPE AND IRRIGATION PROPOSED. | | | FINAL PLAN MUST BE APPROVED. | | | | | | 9. NOT SATISFIED. SHOW LOCATION OF PUMP EQUIPMENT AND | | | SOURCE FOR THE IRRIGATION SYSTEM TO MEET CONDITION #11 | | | REQUIRING USE OF SURFACE WATER FROM LAKES. | | | COULD NOT LOCATE NOTE OR CALL OUT FOR IRRIGATION PUMP | | | ON LANDSCAPE PLAN. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
12-10-2019 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
12-10-2019 |
Time |
17:24 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
12-10-2019 |
Time |
17:24 |
Sent To |
|
|
| Notes |
| 2019-12-10 17:25:39 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 | | | PROJECT: 1885 CENTREPARK Z19110010 | | | DECEMBER 10, 2019 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. SECTION 94-448 (D)(3) REQUIRES NATIVE TREES IN GOOD | | | CONDITION TO BE PRESERVED ON SITE OR RELOCATED. ANSI A | | | 300 (PART 5) STANDARDS SPECIFY EXAMPLES OF SUITABILITY | | | RATINGS OF GOOD, MODERATE, OR POOR FOR RELOCATION. | | | PROVIDE CONDITION AND RELOCATION POTENTIAL FOR THE | | | SEVEN LIVE OAKS, ONE GUMBO LIMBO, AND ONE SILVER | | | BUTTONWOOD LISTED IN THE TREE DISPOSITION PLAN. | | | | | | 2. ON THE LANDSCAPE REQUIREMENTS CHART, CORRECT THE | | | SITE LANDSCAPE CALCULATIONS TO SHOW THE SHADE TREE AND | | | FLOWERING TREE CALCULATIONS BASED ON 40 PERCENT | | | REQUIRED OPEN SPACE PER CPD ZONING, AND THEN ADD THE | | | MULTIFAMILY 220 TREES TO ACHIEVE THE TOTAL TREES | | | REQUIRED. THEN SHOW PROVIDED NUMBER OF TREES ON SITE. | | | ONCE ANY TREE PLANTING PLAN FOR THE POA PARCELS HAS | | | BEEN FINALIZED AND SUBMITTED FOR REVIEW, THE FINAL | | | COUNT OF DEFICIENT TREES SHALL BE DETERMINED. | | | | | | 3. SHOW COMPLIANCE WITH SECTION 94-445 L. PLANT | | | SPECIES. A MINIMUM OF 60 PERCENT OF PLANT MATERIAL | | | ADDED SHALL BE FLORIDA NATIVE OR DROUGHT TOLERANT | | | SPECIES SELECTED FROM THE CITY LIST OR THE LIST OF | | | SPECIES IN THE MOST RECENT EDITION OF SOUTH FLORIDA | | | WATER MANAGEMENT DISTRICT WATERWISE SOUTH FLORIDA | | | LANDSCAPES BY SHOWING THE ACTUAL PERCENTAGE. | | | | | | 4. PLEASE SHOW LOCATIONS OF WATER, SEWER, FIRE LINES, | | | DRAINAGE LINES AND FPL TRANSFORMERS ON THE LANDSCAPE | | | PLAN AND RESOLVE CONFLICTS WITH LANDSCAPING WHEN CIVIL | | | DRAWINGS ARE FINALIZED. | | | | | | 5. GREEN BUTTONWOOD TREES AND ROYAL PALMS SHOWN IN THE | | | PAVED PLAZA AREAS NEED TO HAVE STRUCTURAL SOIL OR SOIL | | | CELLS UNDER THE PAVED AREA TO ALLOW FOR ROOT | | | DEVELOPMENT. PROVIDE LOCATIONS AND CROSS SECTION DETAIL | | | FOR THE TYPE SELECTED. | | | | | | 6. SHOW THE LOCATIONS OF ALL SITE LIGHTING ON THE | | | LANDSCAPE PLAN AND RESOLVE ANY CONFLICTS WITH TREES. | | | | | | 7. SHOW THE OFFSITE TREES RELATED TO THE | | | RECONFIGURATION OF THE EXISTING PARKING AREA AS A | | | SEPARATE PLAN AND PLANT LIST. ADDRESS ALL MISSING | | | PARKING AREA TREES IN TERMINAL ISLANDS. | | | THIS IS A SEPARATE PARCEL, SO WILL REQUIRE AND | | | AMENDMENT TO THAT PARCEL?S APPROVED SITE PLAN AND | | | LANDSCAPE PLAN. PLACEMENT OF UTILITY LINES FOR THE | | | PROPOSED SITE WITHIN THIS PARKING AREA CREATES | | | NONCONFORMING LANDSCAPE AREAS BY DISPLACING REQUIRED | | | TREES. | | | | | | | | | | | | RESOLUTION NO. 97-17 | | | | | | 8. PER EXHIBIT F, APPROVAL FROM THE ARCHITECTURAL | | | REVIEW BOARD MUST BE PROVIDED FOR THE LANDSCAPE AND | | | IRRIGATION PROPOSED. | | | | | | 9. SHOW LOCATION OF PUMP EQUIPMENT AND SOURCE FOR THE | | | IRRIGATION SYSTEM TO MEET CONDITION #11 REQUIRING USE | | | OF SURFACE WATER FROM LAKES. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PU |
PUBLIC UTILITIES |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
4 |
Status |
P |
Date |
10-05-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
10-05-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
10-05-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-10-05 14:31:06 | NO FURTHER COMMENTS FROM DEPT. OF PUBLIC WORKS. | | | | | | MATT HEJAZI | | | [email protected] |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
3 |
Status |
F |
Date |
08-06-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
08-06-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
08-06-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-08-06 11:43:37 | PLEASE PROVIDE: | | | 1- AUTO TURN FOR THE SANITATION SERVICE, FRONT LOADER | | | TRUCK | | | * TRUCK LENGTH: 35 FT | | | * TRUCK WITH: 11 FT | | | * TURNING RADIUS: | | | - SAE TURNING RADIUS: 32.5 FT | | | - CURB-TO-CURB DIAMETER: 74 FT | | | - WALL-TO-WALL DIAMETER: 86.3 FT | | | 2- TRASH ROOMS SPECIFICTION. | | | 3- COMPACTOR`S SPECIFICATIONS. FOR THE COMPACTORS` | | | ROLL-OUT CONTAINERS TO BE SERVICED BY THE CITY, THE | | | CONTAINERS SHALL BE COMPATIBLE WITH A FRONT-LOADER | | | TRUCK. | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
2 |
Status |
F |
Date |
06-29-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
06-29-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
06-29-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-06-29 17:18:04 | | | | PLEASE PROVIDE THE FOLLOWINGS: | | | 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID | | | WASTE VOLUME PRODUCED ALONG WITH THE SIZE AND TYPE OF | | | THE CONTAINER (I.E. DUMPSTER/COMPACTOR) THAT WILL BE | | | UTILIZED THAT WILL BE UTILIZED FOR THE SANITATION | | | SERVICE. | | | 2- DETAILS FOR SANITATION SERVICE (I.E. CONTAINER TYPE, | | | LOCATION, ETC.) | | | 3- DESIGNATED LOCATION FOR THE BULK ITEM PICK UP AND | | | RECYCLING CONTAINERS. | | | | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
F |
Date |
12-06-2019 |
|
|
Cont ID |
|
| Sent By |
|
Date |
12-06-2019 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
12-06-2019 |
Time |
|
Sent To |
|
|
| Notes |
| 2019-12-06 15:52:00 | | | | PLEASE PROVIDE THE FOLLOWINGS: | | | - LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID | | | WASTE VOLUME PRODUCED ALONG WITH THE SIZE AND TYPE OF | | | THE CONTAINER (I.E. DUMPSTER/COMPACTOR) THAT WILL BE | | | UTILIZED THAT WILL BE UTILIZED FOR THE SANITATION | | | SERVICE. | | | - AUTO TURN FOR THE SANITATION SERVICE, FRONT LOADER | | | TRUCK | | | * TRUCK LENGTH: 35 FT | | | * TRUCK WITH: 11 FT | | | * TURNING RADIUS: | | | - SAE TURNING RADIUS: 32.5 FT | | | - CURB-TO-CURB DIAMETER: 74 FT | | | - WALL-TO-WALL DIAMETER: 86.3 FT | | | - DESIGNATED LOCATION FOR THE BULK ITEM PICK UP AND | | | RECYCLING CONTAINERS. | | | - FOR A FREESTANDING SITE DUMPSTER ENCLOSURE, THE | | | ENCLOSURE SHALL COMPLY WITH THE LATEST REVISION OF CITY | | | OF WEST PALM BEACH GENERAL CONSTRUCTION-GARBAGE | | | ENCLOSURE STANDARD, CG-8. | | | | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
4 |
Status |
F |
Date |
11-23-2020 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
11-23-2020 |
Time |
14:00 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
11-23-2020 |
Time |
14:25 |
Sent To |
|
|
| Notes |
| 2020-11-23 14:25:16 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 10/30/2020 SUBMITTAL: | | | | | | 1. [SATISFIED] PAGE 17 OF THE DECLARATION OF CONVENANTS | | | (ORB5430, PAGE 1548) STATES THERE IS TO BE A 20' BUFFER | | | ADJACENT TO LAKES AND NO PARKING IS PERMITTED IN THE | | | BUFFER. PROVIDE A COPY OF THE AMENDED CONVENANT. | | | APPLICANT'S RESPONSE IS THAT THE BUFFER IS NOT NEEDED | | | NEXT TO THE RETAINING WALL AROUND THE LAKE, WHICH WILL | | | PERMIT THE PARKING GARAGE STRUCTURE WITHIN 20 FEET OF | | | THE RETENTION AREA. | | | | | | 1.1 [SATISFIED] SHOW THE 20' BUFFER PER THE DECLARATION | | | OF COVENANTS ALONG THE PROPOSED LAKE EXPANSION. | | | APPLICANT'S RESPONSE IS THAT THE BUFFER IS NOT NEEDED | | | NEXT TO THE RETAININAG WALL AROUND THE LAKE. | | | | | | 1.2 [NOT SATISFIED] PART OF THE CORNERS OF THE BUILDING | | | AND BALCONIES APPEAR TO ENCROACH IN THE 20' CANAL | | | BUFFER. APPLICANT'S RESPONSE STATES THE CANAL BUFFER | | | WILL BE AMENDED. THIS AMENDMENT CAN BE A CONDITION FOR | | | SITE PLAN APPROVAL WITH THE AMENDMENT PROVIDED BEFORE | | | THE ISSUANCE OF THE BUIDLING PERMIT. | | | | | | | | | 1.3 [NOT SATISFIED] SECTION 8 OF THE DECLARATION OF | | | COVENANTS STATES PARKING WILL NOT BE PERMITTED ON | | | PUBLIC ROADWAYS. THE PLANNING DEPARTMENT OR THE LAW | | | DEPARTMENT SHOULD DETERMINE IF THE DECLARATION OF | | | COVENANTS SHOULD BE AMENDED. | | | | | | 2. [SATISFIED] UPDATE THE REFERENCE TO THE FEMA FIRM | | | LISTED ON THE SURVEY. NEW FLOOD MAPS WERE ISSUED IN | | | 2017. THE SURVEY WAS NOT INCLUDED WITH THIS SUBMITTAL. | | | NOTE THIS IS THE THIRD REQUEST. | | | | | | 3. [SATISFIED] CONSIDER RELOCATING THE WATER AND FIRE | | | SERVICE LINES FROM UNDER LANDSCAPE ISLANDS TO AVOID | | | CONFLICTS WITH THE PROPOSED LANDSCAPING. | | | | | | 4. [NO LONGER APPLICABLE] PROVIDE CROSS SECTIONS IN | | | EACH DIRECTION OF THE DETENTION AREA SHOWING THE GRAVEL | | | PATHWAY. | | | | | | 5. [SATISFIED] THE STORM ALIGNMENT ON THE LANDSCAPE | | | PLANS DOESN'T APPEAR TO MATCH THE ALIGNMENT OF ON THE | | | ENGINEERING PLANS. | | | | | | 6. [SATISFIED] CONFIRM THE LENGTH OF RETAINING WALL ALL | | | ALONG THE LAKE DOES NOT EXCEED 40 PERCENT OF THE | | | SHORELINE LENGTH PER SFWMD WET RETENTION/DETENTION AREA | | | DIMENSIONAL CRITERIA. THE SHORELINE IS MEASURED AT THE | | | CONTROL ELEVATION. APPLICANT'S RESPONSE STATES THE | | | TOTAL LENGTH OF RETAINNING WALL AROUND THE LAKE WILL | | | NOT EXCEED 40 PERCENT OF THE SHORELINE LENGTH. | | | | | | 7. [NOT SATISFIED] THE FOLLOWING APPEAR TO BE PROPOSED | | | TO BE CONSTRUCTED ON LAND NOT OWNED BY THE APPLICANT. | | | CONSTRUCTION EASEMENTS AND MAINTENANCE AGREEMENTS MAY | | | BE NECESSARY. | | | A. LAKE EXPANSION AND RETAINING WALL | | | B. PAVER ENTRANCE | | | C. WATER MAINS, WATER METER AND BACKFLOW ASSEMBLIES | | | D. STORMWATER AND SANITARY SEWER STRUCTURES | | | E. PARKING LOT MODIFICATIONS | | | THE MAINTENANCE AGREEEMENTS [IF REQUIRED BY OTHER | | | PROPERTY OWNER(S)] AND CONSTRUCTION EASEMENTS CAN BE A | | | CONDITION FOR SITE PLAN APPROVAL, TO BE SUBMITTED | | | BEFORE THE ISSUANCE OF THE FIRST BUILDING PERMIT. | | | | | | 8. [SATISFIED] PROVIDE CCTV OF THE STORM SEWER AS SHOWN | | | ON MAP PROVIDED BY V. NOEL/CWPB. CCTV WILL NOT BE | | | NEEDED IF THE APPLICANT CAN PROVIDE DOCUMENTATION THAT | | | THE OPERATION AND MAINTENANCE OF THE STORM SEWER IS NOT | | | THE RESPONSIBILITY OF THE CITY. | | | | | | 9. [PARTIALLY SATISFIED] EAST SIDE OF PROPOSED BUILDING | | | WILL BE CONSTRUCTED CLOSED TO THE EXISTING DRAINAGE | | | SYSTEM. THERE IS AN EXISTING CATCH BASIN INLET UNDER A | | | PROPOSED BALCONY. LANDSCAPE PLANS SHOW MULTIPLE SPECIES | | | OF TREES OR PALMS PLANTED OVER OR NEAR THE STORM PIPE. | | | STAFF SUGGESTS RELOCATING THE STORM PIPE AWAY FROM THE | | | PROPOSED BUILDING AND PROVIDING ROOT BARRIERS AROUND | | | TREES WHERE NEEDED. EXISTING STORM PIPE NEEDS TO BE | | | SHOWN TO BE REMOVED WHERE APPLICABLE. WILL ONE OF THE | | | NEW STRUCTURES BE AN INLET? | | | | | | 10. [SATISFIED] CALL OUT EXISTING UTILITY EASEMENT ON | | | THE CIVIL PLAN AND PROPOSED CWPB UTILITY EASEMENT ON | | | THE LANDSCAPE PLANS. | | | | | | 11. [NOT SATISFIED] EXPLAIN WHAT THE EAST FACING ARROW | | | REPRESENTS AS SHOWN ON THE CIVIL PLAN IN THE BIKE LANE | | | OF CENTREPARK BLVD. E. [RESPONSE TO LAST SET OF | | | COMMENTS INDICATED THE ARROW WAS DELETED. THE ARROW IS | | | STILL ON THE CONCEPTUAL ENGINEERING PLAN. | | | | | | 12. [TO BE ADDRESSED AT ENGINEERING PERMIT SUBMITTAL] | | | UPDATE FDOT STANDARD INDEX REFERENCES TO FDOT STANDARD | | | PLAN REFERENCES. THIS COMMENT CAN BE ADDRESSED WITH THE | | | ENGINEERING PERMIT SUBMITTAL. | | | | | | 13. [NEW COMMENT] PROPOSED RAISED INTERSECTION: | | | A. NO STOP SIGN OR STOP BAR SHOWN. | | | B. NO ADVANCED WARNING SIGNS SHOWN | | | C. CURB RAMP ON NORTHWEST CORNER DOES NOT FALL WITHIN | | | THE CROSS WALK. | | | D. CROSS WALK AND CURB RAMP ON NORTHEAST CORNER FALLS | | | WITHIN THE EAST SLOPE OF THE RAISED INTERSECTION. | | | E. RAISED INTERSECTION WILL AFFECT DRAINAGE PATTERNS. | | | F. NO MARKINGS SHOWN ON RAISED INTERSECTION FOR | | | WESTBOUND THROUGH LANE | | | | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
3 |
Status |
F |
Date |
09-15-2020 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
09-15-2020 |
Time |
05:38 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
09-15-2020 |
Time |
05:38 |
Sent To |
|
|
| Notes |
| 2020-09-15 05:38:19 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 8/5/2020 SUBMITTAL: | | | | | | 1. [SATISFIED] PAGE 17 OF THE DECLARATION OF CONVENANTS | | | (ORB5430, PAGE 1548) STATES THERE IS TO BE A 20' BUFFER | | | ADJACENT TO LAKES AND NO PARKING IS PERMITTED IN THE | | | BUFFER. PROVIDE A COPY OF THE AMENDED CONVENANT. | | | APPLICANT'S RESPONSE IS THAT THE BUFFER IS NOT NEEDED | | | NEXT TO THE RETAINING WALL AROUND THE LAKE, WHICH WILL | | | PERMIT THE PARKING GARAGE STRUCTURE WITHIN 20 FEET OF | | | THE RETENTION AREA. | | | | | | 1.1 [SATISFIED] SHOW THE 20' BUFFER PER THE DECLARATION | | | OF COVENANTS ALONG THE PROPOSED LAKE EXPANSION. | | | APPLICANT'S RESPONSE IS THAT THE BUFFER IS NOT NEEDED | | | NEXT TO THE RETAININAG WALL AROUND THE LAKE. | | | | | | 1.2 [NOT SATISFIED] PART OF THE CORNERS OF THE BUILDING | | | AND BALCONIES APPEAR TO ENCROACH IN THE 20' CANAL | | | BUFFER. APPLICANT'S RESPONSE STATES THE CANAL BUFFER | | | WILL BE AMENDED. THIS AMENDMENT CAN BE A CONDITION FOR | | | SITE PLAN APPROVAL WITH THE AMENDMENT PROVIDED BEFORE | | | THE ISSUANCE OF THE BUIDLING PERMIT. | | | | | | | | | 1.3 [NOT SATISFIED] SECTION 8 OF THE DECLARATION OF | | | COVENANTS STATES PARKING WILL NOT BE PERMITTED ON | | | PUBLIC ROADWAYS. THE PLANNING DEPARTMENT OR THE LAW | | | DEPARTMENT SHOULD DETERMINE IF THE DECLARATION OF | | | COVENANTS SHOULD BE AMENDED. | | | | | | 2. [NOT SATISFIED] UPDATE THE REFERENCE TO THE FEMA | | | FIRM LISTED ON THE SURVEY. NEW FLOOD MAPS WERE ISSUED | | | IN 2017. THE SURVEY WAS NOT INCLUDED WITH THIS | | | SUBMITTAL. NOTE THIS IS THE THIRD REQUEST. | | | | | | 3. [SATISFIED] CONSIDER RELOCATING THE WATER AND FIRE | | | SERVICE LINES FROM UNDER LANDSCAPE ISLANDS TO AVOID | | | CONFLICTS WITH THE PROPOSED LANDSCAPING. | | | | | | 4. [NO LONGER APPLICABLE] PROVIDE CROSS SECTIONS IN | | | EACH DIRECTION OF THE DETENTION AREA SHOWING THE GRAVEL | | | PATHWAY. | | | | | | 5. [SATISFIED] THE STORM ALIGNMENT ON THE LANDSCAPE | | | PLANS DOESN'T APPEAR TO MATCH THE ALIGNMENT OF ON THE | | | ENGINEERING PLANS. | | | | | | 6. [SATISFIED] CONFIRM THE LENGTH OF RETAINING WALL ALL | | | ALONG THE LAKE DOES NOT EXCEED 40 PERCENT OF THE | | | SHORELINE LENGTH PER SFWMD WET RETENTION/DETENTION AREA | | | DIMENSIONAL CRITERIA. THE SHORELINE IS MEASURED AT THE | | | CONTROL ELEVATION. APPLICANT'S RESPONSE STATES THE | | | TOTAL LENGTH OF RETAINNING WALL AROUND THE LAKE WILL | | | NOT EXCEED 40 PERCENT OF THE SHORELINE LENGTH. | | | | | | 7. [NOT SATISFIED] THE FOLLOWING APPEAR TO BE PROPOSED | | | TO BE CONSTRUCTED ON LAND NOT OWNED BY THE APPLICANT. | | | CONSTRUCTION EASEMENTS AND MAINTENANCE AGREEMENTS MAY | | | BE NECESSARY. | | | A. LAKE EXPANSION AND RETAINING WALL | | | B. PAVER ENTRANCE | | | C. WATER MAINS, WATER METER AND BACKFLOW ASSEMBLIES | | | D. STORMWATER AND SANITARY SEWER STRUCTURES | | | E. PARKING LOT MODIFICATIONS | | | THE MAINTENANCE AGREEEMENTS [IF REQUIRED BY OTHER | | | PROPERTY OWNER(S)] AND CONSTRUCTION EASEMENTS CAN BE A | | | CONDITION FOR SITE PLAN APPROVAL, TO BE SUBMITTED | | | BEFORE THE ISSUANCE OF THE FIRST BUILDING PERMIT. | | | | | | 8. [SATISFIED] PROVIDE CCTV OF THE STORM SEWER AS SHOWN | | | ON MAP PROVIDED BY V. NOEL/CWPB. CCTV WILL NOT BE | | | NEEDED IF THE APPLICANT CAN PROVIDE DOCUMENTATION THAT | | | THE OPERATION AND MAINTENANCE OF THE STORM SEWER IS NOT | | | THE RESPONSIBILITY OF THE CITY. | | | | | | 9. [NOT SATISFIED] EAST SIDE OF PROPOSED BUILDING WILL | | | BE CONSTRUCTED CLOSED TO THE EXISTING DRAINAGE SYSTEM. | | | THERE IS AN EXISTING CATCH BASIN INLET UNDER A PROPOSED | | | BALCONY. LANDSCAPE PLANS SHOW MULTIPLE SPECIES OF TREES | | | OR PALMS PLANTED OVER OR NEAR THE STORM PIPE. STAFF | | | SUGGESTS RELOCATING THE STORM PIPE AWAY FROM THE | | | PROPOSED BUILDING AND PROVIDING ROOT BARRIERS AROUND | | | TREES WHERE NEEDED. | | | | | | 10. [NEW COMMENT] CALL OUT EXISTING UTILITY EASEMENT ON | | | THE CIVIL PLAN AND PROPOSED CWPB UTILITY EASEMENT ON | | | THE LANDSCAPE PLANS. | | | | | | 11. [NEW COMMENT] EXPLAIN WHAT THE EAST FACING ARROW | | | REPRESENTS AS SHOWN ON THE CIVIL PLAN IN THE BIKE LANE | | | OF CENTREPARK BLVD. E. | | | | | | 12. [NEW COMMENT] UPDATE FDOT STANDARD INDEX REFERENCES | | | TO FDOT STANDARD PLAN REFERENCES. THIS COMMENT CAN BE | | | ADDRESSED WITH THE ENGINEERING PERMIT SUBMITTAL. | | | | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
F |
Date |
07-31-2020 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
07-31-2020 |
Time |
06:09 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
07-31-2020 |
Time |
06:14 |
Sent To |
|
|
| Notes |
| 2020-07-31 06:09:50 | THE FOLLOWING COMMENTS ARE FROM THE SUBMITTAL PROVIDED | | | FOR THE JULY 9, 2020 PPRC MEETING AND MUST BE ADDRESSED | | | PRIOR TO SITE PLAN APPROVAL: | | | | | | 1. [NOT SATISFIED] PAGE 17 OF THE DECLARATION OF | | | CONVENANTS (ORB5430, PAGE 1548) STATES THERE IS TO BE A | | | 20' BUFFER ADJACENT TO LAKES AND NO PARKING IS | | | PERMITTED IN THE BUFFER. PROVIDE A COPY OF THE AMENDED | | | CONVENANT. | | | | | | 1.1 [NEW COMMENT] SHOW THE 20' BUFFER PER THE | | | DECLARATION OF COVENANTS ALONG THE PROPOSED LAKE | | | EXPANSION. | | | | | | 1.2 [NEW COMMENT] PART OF THE CORNERS OF THE BUILDING | | | AND BALCONIES APPEAR TO ENCROACH IN THE 20' CANAL | | | BUFFER. | | | | | | | | | 1.3 [NEW COMMENT] SECTION 8 OF THE DECLARATION OF | | | COVENANTS STATES PARKING WILL NOT BE PERMITTED ON | | | PUBLIC ROADWAYS. | | | | | | 2. [NOT SATISFIED] UPDATE THE REFERENCE TO THE FEMA | | | FIRM LISTED ON THE SURVEY. NEW FLOOD MAPS WERE ISSUED | | | IN 2017. | | | | | | 3. [SATISFIED] CONSIDER RELOCATING THE WATER AND FIRE | | | SERVICE LINES FROM UNDER LANDSCAPE ISLANDS TO AVOID | | | CONFLICTS WITH THE PROPOSED LANDSCAPING. | | | | | | 4. [NO LONGER APPLICABLE] PROVIDE CROSS SECTIONS IN | | | EACH DIRECTION OF THE DETENTION AREA SHOWING THE GRAVEL | | | PATHWAY. | | | | | | 5. [SATISFIED] THE STORM ALIGNMENT ON THE LANDSCAPE | | | PLANS DOESN'T APPEAR TO MATCH THE ALIGNMENT OF ON THE | | | ENGINEERING PLANS. | | | | | | 6. [NEW COMMENT] CONFIRM THE LENGTH OF RETAINING WALL | | | ALL ALONG THE LAKE DOES NOT EXCEED 40 PERCENT OF THE | | | SHORELINE LENGTH PER SFWMD WET RETENTION/DETENTION AREA | | | DIMENSIONAL CRITERIA. THE SHORELINE IS MEASURED AT THE | | | CONTROL ELEVATION. | | | | | | 7. [NEW COMMENT] THE FOLLOWING APPEAR TO BE PROPOSED TO | | | BE CONSTRUCTED ON LAND NOT OWNED BY THE APPLICANT. | | | CONSTRUCTION EASEMENTS AND MAINTENANCE AGREEMENTS MAY | | | BE NECESSARY. | | | A. LAKE EXPANSION AND RETAINING WALL | | | B. PAVER ENTRANCE | | | C. WATER MAINS, WATER METER AND BACKFLOW ASSEMBLIES | | | D. STORMWATER AND SANITARY SEWER STRUCTURES | | | E. PARKING LOT MODIFICATIONS | | | | | | 8. [NEW COMMENT] PROVIDE CCTV OF THE STORM SEWER AS | | | SHOWN ON MAP PROVIDED BY V. NOEL/CWPB. CCTV WILL NOT BE | | | NEEDED IF THE APPLICANT CAN PROVIDE DOCUMENTATION THAT | | | THE OPERATION AND MAINTENANCE OF THE STORM SEWER IS NOT | | | THE RESPONSIBILITY OF THE CITY. | | | | | | 9. [NEW COMMENT] EAST SIDE OF PROPOSED BUILDING WILL BE | | | CONSTRUCTED CLOSED TO THE EXISTING DRAINAGE SYSTEM. | | | THERE IS AN EXISTING CATCH BASIN INLET UNDER A PROPOSED | | | BALCONY. | | | | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
12-10-2019 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
12-10-2019 |
Time |
13:36 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
12-10-2019 |
Time |
13:43 |
Sent To |
|
|
| Notes |
| 2019-12-10 13:37:27 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT | | | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT | | | | | | HTTPS://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FO | | | RMS,-PERMITS-APPLICATIONS | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. PAGE 17 OF THE DECLARATION OF CONVENANTS (ORB5430, | | | PAGE 1548) STATES THERE IS TO BE A 20' BUFFER ADJACENT | | | TO LAKES AND NO PARKING IS PERMITTED IN THE BUFFER. | | | | | | 2. UPDATE THE REFERENCE TO THE FEMA FIRM LISTED ON THE | | | SURVEY. NEW FLOOD MAPS WERE ISSUED IN 2017. | | | | | | 3. CONSIDER RELOCATING THE WATER AND FIRE SERVICE LINES | | | FROM UNDER LANDSCAPE ISLANDS TO AVOID CONFLICTS WITH | | | THE PROPOSED LANDSCAPING. | | | | | | 4. PROVIDE CROSS SECTIONS IN EACH DIRECTION OF THE | | | DETENTION AREA SHOWING THE GRAVEL PATHWAY. | | | | | | 5. THE STORM ALIGNMENT ON THE LANDSCAPE PLANS DOESN?T | | | APPEAR TO MATCH THE ALIGNMENT OF ON THE ENGINEERING | | | PLANS. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY | | | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. | | | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS | | | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE | | | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS | | | | | | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED | | | WITH THE ENGINEERING PERMIT APPLICATION. | | | | | | 3. PROVIDE A COPY OF THE SFWMD ERP PERMIT MODIFICATION | | | PRIOR TO STARTING CONSTRUCTION. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
4 |
Status |
F |
Date |
11-23-2020 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
11-23-2020 |
Time |
13:05 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-11-23 13:11:18 | 1. TREES IN UE AND ADJACENT TO 12" WATER MAIN NEEDS TO | | | BE DISCUSSED WITH UTILITIES AND RAY CARANCI. ADVICE IS | | | TO SEEK ALTERNATIVE LOCATION. | | | | | | CONDITIONS OF APPROVAL WILL INCLUDE TERMINATION OF | | | LANDSCAPE EASEMENT AND LAKE BUFFER MODIFICATION. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
3 |
Status |
F |
Date |
09-11-2020 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
09-11-2020 |
Time |
08:06 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-09-11 08:16:44 | 1. CCTV JUST RECEIVED AND WILL NEED TO BE REVIEWED. | | | 2. PROPOSED LANDSCAPING ALONG CENTREPARK DRIVE FALLS ON | | | TOP OF EXISTING 12" WATER MAIN WHICH IS NOT ALLOWED. | | | 3. NO TREES WITHIN 5 FEET OF WATER OR SANITARY | | | SERVICES. | | | 4. NEED SIGN-OFF OF POA OF PROPOSED IMPROVEMENTS IN | | | BUFFERS PRIOR TO APPROVAL. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
F |
Date |
07-07-2020 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
07-07-2020 |
Time |
08:43 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-07-07 08:48:39 | 1. ENGINEERING PLAN TOO CONGESTED. | | | 2. TAP INTO WATER MAIN NEEDS TO BE CLOSED TO METERS. | | | CITY DOES NOT WANT THAT RUN OF MAIN. METERS CONFLICT | | | WITH PROPOSED LANDSCAPING. | | | 3. BUILDINGS ENCROACH INTO CANAL BUFFER. POA WILL NEED | | | TO SIGN OFF ON ENCROACHMENT AND ABANDONMENT OF | | | LANDSCAPE EASEMENT. | | | 4. CUSTOMER SERVICE WILL NEED TO APPROVE OFF-SITE | | | METERS. | | | 5. UTILITIES WILL DETERMINE POINT OF SERVICE FOR | | | SANITARY. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
12-10-2019 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
12-10-2019 |
Time |
07:30 |
Rev Time |
|
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2019-12-10 07:36:55 | 1. MAINTENANCE AGREEMENT WILL BE REQUIRED FOR ANY | | | NON-STANDARD ITEMS IN RIGHT-OF-WAY. | | | 2. ACCESS EASEMENT WILL BE REQUIRED FOR SIDEWALK WITHIN | | | PROPERTY ALONG CENTREPARK BLVD. | | | 3. PROVIDE COPY OF CROSS-ACCESS/UTILITY AGREEMENT. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
4 |
Status |
F |
Date |
11-23-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
11-23-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-11-23 14:48:48 | TRAFFIC STATEMENT ? NO COMMENTS | | | SITE PLAN COMMENTS: | | | 1. IMPLEMENT PATTERNS (EITHER BRICKS OR THERMOPLASTIC) | | | ON THE PROPOSED 4" RAISED INTERSECTION | | | 2. SHOWCASE IN THE SITE PLANS THE BIKE LANE TRANSITION | | | PRIOR TO THE WESTBOUND RIGHT-TURN LANE ON CENTREPARK | | | BLVD | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
3 |
Status |
F |
Date |
09-14-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
09-14-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
08-08-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-09-14 13:09:06 | | | | | | | TRAFFIC STATEMENT ? NO COMMENTS | | | | | | SITE PLAN COMMENTS: | | | | | | 1. THE 24 FEET WIDTH FOR THE DRIVEWAY ON CENTREPARK | | | DRIVE EAST MAY BE MAINTAINED, BUT THE FOLLOWING | | | FEATURES PROVIDED: COLORED THERMOPLASTIC CROSSING | | | MARKINGS AND PEDESTRIAN REFUGE ISLAND. | | | 2. CLARIFY THE DELIVERY ACCESS PATH BETWEEN THE LOADING | | | AREA AND THE RETAIL USE. | | | 3. IDENTIFY AND DESIGNATE A MICRO-MOBILITY STATION AREA | | | (MINIMUM 8 X 20 FEET) AND PROVIDE BASIC ELECTRIFICATION | | | READINESS (CIRCUIT BOX AND ELECTRIC CONDUIT) | | | 4. PROVIDE BIKE LANES ON CENTREPARK DRIVE EAST ALONG | | | THE PROPERTY FRONTAGE SO TO INCENTIVIZE BICYCLE MODE OF | | | TRANSPORTATION AND TO CONNECT TO THE PLANNED BIKE LANE | | | SYSTEM ON CENTREPARK BLVD. THIS FEATURE SHALL BE | | | IMPLEMENTED AS PART OF THE TDM STRATEGIES AND | | | INDEPENDENTLY OF PARKING WAIVER APPLICATION(S), IF ANY. | | | 5. PROVIDE A ROUNDABOUT OR A DUTCH JUNCTION AT | | | CENTREPARK BOULEVARD/CENTREPARK DRIVE EAST TO | | | FACILITATE BICYCLE TURNING MOVEMENTS. THIS FEATURE | | | SHALL BE IMPLEMENTED AS PART OF THE TDM STRATEGIES AND | | | INDEPENDENTLY OF PARKING WAIVER APPLICATION(S), IF ANY. | | | 6. PROVIDE PEDESTRIAN REFUGE ISLANDS AT THE CENTREPARK | | | DRIVE EAST AND CENTREPARK BOULEVARD INTERSECTION FOR | | | SAFETY PURPOSES AND TO FACILITATE ACCESS TO THE NEARBY | | | BUS STOP ON AUSTRALIAN AVENUE. | | | 7. SIDEWALK EASEMENT WILL BE REQUIRED FOR THE PORTION | | | OF SIDEWALK OUTSIDE PUBLIC RIGHT-OF-WAY. PLEASE | | | SHOWCASE THE EXTENT OF THE EASEMENT IN THE SITE PLAN. | | | 8. IMPLEMENT AND/OR ACKNOWLEDGE THE FOLLOWING | | | TRANSPORTATION DEMAND MANAGEMENT (TDM) MEASURES TO BE | | | CONSISTENT WITH THE CITY?S COMPREHENSIVE PLAN: | | | A. UNBUNDLE PARKING FROM RESIDENTS? LEASES (IF RENTAL | | | UNITS). | | | B. PROVIDE FOR A PERIOD OF ONE-YEAR SUBSIDIZED TRI-RAIL | | | PASS WHICH REDUCES THE FARES BY 50% FOR NEW RESIDENTS, | | | OR SUBSIDIZED MICRO-MOBILITY SERVICE OR PALM TRAN BUS | | | PASS WITH EQUIVALENT MONETARY VALUES. | | | C. COORDINATE WITH TRI-RAIL TO INVESTIGATE HAVING THE | | | TRI-RAIL AIRPORT SHUTTLE TO ADD A STOP AT THE EXISTING | | | PALM TRAN STOP NEAR THE SITE. | | | D. MICRO-MOBILITY AND BICYCLE USE INCENTIVES, BY POLICY | | | AND SITE DESIGN | | | | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
2 |
Status |
F |
Date |
07-09-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
07-09-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-07-09 13:02:42 | TRAFFIC STATEMENT COMMENT: | | | 1. PROVIDE COUNTY TPS LETTER | | | 2. PROVIDE PROPER INTERSECTION ANALYSIS AT CENTREPARK | | | BOULEVARD/CENTREPARK DRIVE EAST. PROVIDE SYNCHRO | | | OUTPUTS FOR THE FOLLOWING SCENARIOS: | | | A. EXISTING | | | B. FUTURE (INCLUSIVE OF OTHER APPROVED/PLANNED | | | DEVELOPMENTS) | | | C. FUTURE +PROJECT | | | 3. PROVIDE TRAFFIC COUNTS DATA | | | SITE PLAN COMMENT: | | | 4. REDUCE THE DRIVEWAY WIDTH TO 24 FEET FOR THE | | | DRIVEWAY ON CENTREPARK DRIVE EAST. | | | 5. PROVIDE AUTOTURN PATHS FOR DELIVERY AND SERVICE | | | VEHICLES FOR THE LOADING AREA. | | | 6. CLARIFY THE DELIVERY ACCESS PATH BETWEEN THE LOADING | | | AREA AND THE RETAIL USE. | | | 7. PROVIDE BIKE LANES ON CENTREPARK DRIVE EAST TO | | | FACILITATE BICYCLE MODE OF TRANSPORTATION IN THIS AREA. | | | 8. PROVIDE A ROUNDABOUT OR A DUTCH JUNCTION AT | | | CENTREPARK BOULEVARD/CENTREPARK DRIVE EAST TO | | | FACILITATE BICYCLE TURNING MOVEMENT. | | | 9. PROVIDE PEDESTRIAN CROSSINGS AND REFUGE ISLANDS AT | | | THE CENTREPARK DRIVE EAST AND CENTREPARK BOULEVARD | | | INTERSECTION FOR SAFETY PURPOSED AND TO FACILITATE | | | ACCESS TO THE NEARBY BUS STOP ON AUSTRALIAN AVENUE. | | | 10. SIDEWALK EASEMENT WILL BE REQUIRED FOR THE PORTION | | | OF SIDEWALK OUTSIDE PUBLIC RIGHT-OF-WAY. | | | 11. IMPLEMENT THE FOLLOWING TRANSPORTATION DEMAND | | | MANAGEMENT (TDM) MEASURES TO BE CONSISTENT WITH THE | | | CITY'S COMPREHENSIVE PLAN: | | | A. UNBUNDLE PARKING FROM RESIDENTS' LEASES (IF RENTAL | | | UNITS). | | | B. PROVIDE FOR A PERIOD OF ONE YEAR SUBSIDIZED TRI-RAIL | | | PASS WHICH REDUCES THE FARES BY 50% FOR NEW RESIDENTS, | | | OR SUBSIDIZED MICRO-MOBILITY SERVICE OR PALM TRAN BUS | | | PASS WITH EQUIVALENT MONETARY VALUES. | | | C. COORDINATE WITH TRI-RAIL TO INVESTIGATE HAVING THE | | | TRI-RAIL AIRPORT SHUTTLE TO ADD A STOP AT THE EXISTING | | | PALM TRAN STOP NEAR THE SITE. | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
01-17-2020 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-01-17 16:25:46 | TRAFFIC STATEMENT COMMENT: | | | 1. PROVIDE INTERSECTION ANALYSIS AT CENTREPARK | | | BOULEVARD/CENTREPARK DRIVE EAST. | | | 2. PROVIDE TRIP DISTRIBUTION FOR THE DEVELOPMENT WITHIN | | | THE RADIUS OF INFLUENCE CONSISTENT WITH COUNTY?S TPS | | | REQUIREMENT. | | | | | | | | | SITE PLAN COMMENT: | | | 3. REDUCE THE DRIVEWAY WIDTH TO 24 FEET FOR THE | | | DRIVEWAY ON CENTREPARK DRIVE EAST. | | | 4. THE DRIVEWAY DESIGNS ON THE ARCHITECTURAL PLAN AND | | | SITE PLAN ARE DIFFERENT. PLEASE VERIFY AND REVISE. | | | 5. PROVIDE AUTOTURN PATHS FOR DELIVERY AND SERVICE | | | VEHICLES FOR THE LOADING AREA. | | | 6. CLARIFY THE DELIVERY ACCESS PATH BETWEEN THE LOADING | | | AREA AND THE RETAIL USE. | | | 7. PROVIDE BIKE LANES ON CENTREPARK DRIVE EAST TO | | | FACILITATE BICYCLE MODE OF TRANSPORTATION IN THIS AREA. | | | 8. PROVIDE ROUNDABOUT OR DUTCH JUNCTION AT CENTREPARK | | | BOULEVARD/CENTREPARK DRIVE EAST TO FACILITATE BICYCLE | | | TURNING MOVEMENT. | | | 9. PROVIDE PEDESTRIAN REFUGE ISLAND NEAR CENTREPARK | | | DRIVE EAST FOR PEDESTRIANS CROSSING CENTREPARK | | | BOULEVARD TO FACILITY ACCESS TO THE NEARBY BUS STOP ON | | | AUSTRALIAN AVENUE. | | | 10. PROVIDE SEPARATED PARKING ACCESS ROAD ALONG THE | | | SITE FRONTAGE ON CENTREPARK BOULEVARD, SIMILAR TO THE | | | PROPOSED PARKING ACCESS ROAD FOR 1500 CENTREPARK | | | BOULEVARD RESIDENTIAL DEVELOPMENT. | | | 11. SIDEWALK EASEMENT WILL BE REQUIRED FOR THE PORTION | | | OF SIDEWALK OUTSIDE PUBLIC RIGHT-OF-WAY. | | | 12. IMPLEMENT THE FOLLOWING TRANSPORTATION DEMAND | | | MANAGEMENT (TDM) MEASURES TO BE CONSISTENT WITH THE | | | CITY'S COMPREHENSIVE PLAN: | | | A. UNBUNDLE PARKING FROM RESIDENTS? LEASES (IF RENTAL | | | UNITS). | | | B. PROVIDE FOR A PERIOD OF ONE YEAR SUBSIDIZED TRI-RAIL | | | PASS WHICH REDUCES THE FARES BY 50% FOR NEW RESIDENTS, | | | OR SUBSIDIZED MICRO-MOBILITY SERVICE OR PALM TRAN BUS | | | PASS WITH EQUIVALENT MONETARY VALUES. | | | C. COORDINATE WITH TRI-RAIL TO INVESTIGATE HAVING THE | | | TRI-RAIL AIRPORT SHUTTLE TO ADD A STOP AT THE EXISTING | | | PALM TRAN STOP NEAR THE SITE. | | | | | | | | | SHING TSOI | | | CITY IN-HOUSE TRAFFIC CONSULTANT | | | 561-494-1141 | | | [email protected] | | | (IN-HOUSE ON TUESDAYS AND WEDNESDAYS) | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
09-14-2020 |
|
|
Cont ID |
|
| Sent By |
jroach |
Date |
09-14-2020 |
Time |
15:59 |
Rev Time |
0.00 |
| Received By |
jroach |
Date |
09-14-2020 |
Time |
15:59 |
Sent To |
|
|
| Notes |
| 2020-09-14 17:03:10 | PLANS AND PLATS REVIEW COMMITTEE (PPRC) ZONING REVIEW | | | ________________________________________ | | | | | | DATE OF REVIEW: SEPTEMBER 14, 2020 | | | PROJECT NO.: Z19110010 | | | CASE NO.: PB 791II | | | ________________________________________ | | | | | | PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING | | | REVIEW COMMENTS: | | | | | | 1. [ PARTIALLY SATISFIED ] - PLEASE CLARIFY THE | | | METHODOLOGY REGARDING THE PARKING CALCULATION. A SHARED | | | PARKING CALCULATION IS BEING USED, BUT A PARKING STUDY | | | HAS ALSO BEEN PROVIDED TO JUSTIFY A FURTHER REDUCTION | | | IN THE REQUIRED PARKING. AS SUCH, THE APPLICATION WOULD | | | NEED TO BE AMENDED TO SHOW THAT A PARKING WAIVER IS | | | BEING REQUESTED. PARKING WAIVERS WITHIN A PLANNED | | | DEVELOPMENT SHALL COMPLY WITH SEC. 94-207(B)(13) OF THE | | | CITY?S ZLDRS. | | | | | | 1.1 [ NOT SATISFIED ] - STAFF WOULD LIKE CLARIFICATION | | | OR HAVE FURTHER DISCUSSION TO UNDERSTAND THE SHARED | | | PARKING CALCUALTION THAT IS BEING SHOWN. | | | | | | 1.2 [ NEW COMMENT ] - LOT 4N AND 4S SEEM TO BE | | | MISLABELED IN THE "PARKING PROVIDED" PORTION OF THE | | | METHODOLOGY. | | | | | | 2. [ SATISFIED - CONDITION OF APPROVAL ] - PLEASE | | | PROVIDE CLARIFICATION AS TO HOW THE CONFLICTS WITH FPL, | | | AS STATED IN THEIR LETTER (NOVEMBER 5, 2019) WILL BE | | | ADDRESSED. | | | | | | 2.1 [ SATISFIED - CONDITION OF APPROVAL ] - A PORTION | | | OF THE BUILDING IS SHOWN ENROACHING INTO AN EXISTING | | | FPL EASEMENT NEAR THE INTERSECTION. | | | | | | 3. [ SATISFIED ] - SITE PLAN SHALL IDENTIFY THE | | | VISIBILITY TRIANGLE AT THE CORNER OF CENTREPARK | | | BOULEVARD AND CENTREPARK DRIVE EAST. NO ENCROACHMENTS | | | BETWEEN 18 INCHES AND EIGHT (8) FEET SHALL BE WITHIN | | | THIS AREA. | | | | | | 4. [ PARTIALLY SATISFIED ] - PLEASE PROVIDE | | | CLARIFICATION ON HOW TRASH WILL BE MANAGED AND PICKED | | | UP. | | | | | | 4.1. [ NOT SATISFIED ] - PLEASE PROVIDE CONFIRMATION | | | FROM THE CITY'S PUBLIC WORKS DEPARTMENT THAT PROVIDED | | | PICK-UP WILL BE PERMITTED. | | | | | | 5. [ SATISFIED ] - PARKING DETAIL ON SHEET SP-1 IS | | | INCORRECT. | | | | | | 5.1. [ SATISFIED ] - THE NOTE INDICATES TWO (2) FEET TO | | | THE BACK OF THE WHEEL STOP, BUT THE DIMENSION LINE | | | INDICATES THREE (3) FEET. | | | | | | 5.2. [ SATISFIED ] - THE LENGTH OF THE STALL IS | | | DIMENSIONED AT 28 FEET; THIS SHOULD BE 18 FEET. | | | | | | 5.3. [ SATISFIED ] - THE WIDTH OF THE HANDICAP STALL IS | | | DIMENSIONED AT 19 FEET; THIS SHOULD BE 12 FEET. | | | | | | 5.4. [ SATISIFIED ] - THE WIDTH OF THE HANDICAP AISLE | | | IS DIMENSIONED AT EIGHT (8) FEET; THIS SHOULD BE FIVE | | | (5) FEET. | | | | | | 5.5 [ SATISIFIED ] - THE STRIPING FOR THE HANDICAP | | | ACCESS AISLE IS INCORRECT. | | | | | | 6. [ SATISFIED ] - THE PARKING CONFIGURATION SHOWN ON | | | THE SITE PLAN DOES NOT MATCH THE ARCHITECTURAL PLANS. | | | | | | 7. [ SATISFIED ] - THERE APPEARS TO BE A NUMBER OF | | | LOCATIONS WHERE THE STRUCTURAL COLUMNS ARE ENCROACHING | | | INTO THE PARKING STALL. THE COLUMNS SHALL BE CONTAINED | | | ENTIRELY WITHIN THE DOUBLE-STRIPE AND NOT IMPEDE ON THE | | | MINIMUM WIDTH OF THE STALL. A DETAIL MAY NEED TO BE | | | PROVIDED. | | | | | | 7.1. [ SATISFIED ] - ENCROACHMENTS ARE STILL SHOWN. A | | | DETAIL SHALL BE PROVIDED. | | | | | | 8. [ NO LONGER APPLICABLE ] - THE AMENITIES PROVIDED IN | | | THE DETENTION AREA HAVE NO ACCESS TO RESIDENTS/PATRONS | | | OF THE BUILDING. THE ONLY SIDEWALK THAT CONNECT TO THE | | | PATHWAY IS THAT WHICH HAS ACCESS TO THE TRACH ROOM, FPL | | | VAULT, FIRE PUMP, ETC. ACCESS SHALL BE PROVIDE TO THE | | | PUBLIC WALKWAY, CAF? AND/OR LOBBY AND LEASING AREA. | | | | | | 9. [ NO LONGER APPLICABLE ] - TANDEM PARKING SPACES | | | ONLY WORK IF THEY ARE ASSIGNED TO SPECIFIC UNITS. AS | | | SUCH, THESE SPACES CANNOT BE CONSIDERED TOWARD THE | | | SHARED PARKING CALCULATION AS THEY WOULD NOT BE | | | AVAILABLE FOR USE BY MULTIPLE OWNERS/TENANTS. | | | | | | 10. [ NO LONGER APPLICABLE ] - TANDEM PARKING SPACES | | | SHALL NOT HAVE WHEEL STOPS IN BETWEEN THE TWO SPACES. | | | | | | 11. [ NO LONGER APPLICABLE ] - THERE'S SOME CONCERN | | | WITH REGARDING THE SINGLE PARKING SPACE IMMEDIATELY | | | ADJACENT TO THE LOADING AREA ON THE FIRST LEVEL AS IT | | | SEEMS THAT IT WOULD RESULT IN CONFLICTS IN INCOMING | | | VEHICLES AS THE SPACE IS CONCEALED BEHIND THE WALL. | | | | | | 12. [ NO LONGER APPLICABLE ] - THERE APPEARS TO BE | | | INSUFFICIENT BACK-OUT SPACE OF THE FIRST PARKING SPACE | | | AS YOU ENTER THE GARAGE ON THE FIRST LEVEL (NORTH | | | SIDE). | | | | | | 13. [ SATISIFED ] - DIMENSIONS OF BALCONY ENCROACHMENTS | | | SHALL BE PROVIDED. BALCONIES SHALL NOT PROJECT MORE | | | THAN THREE (3) FEET INTO ANY REQUIRED SETBACK. | | | | | | 13.1 [ SATISFIED ] - DIMENSIONS NEED TO BE PROVIDED FOR | | | ALL BALCONIES, ETC. THAT ARE ENCROACHING INTO A | | | SETBACK. | | | | | | 14. [ NO LONGER APPLICABLE ] - STAFF DOESN'T QUITE | | | UNDERSTAND THE CONCEPT OF HAVING THE ?PLAZA? DESIGN IN | | | FRONT OF THE GROUND FLOOR RESIDENTIAL UNITS ALONG | | | CENTREPARK BLVD. WALK-UP UNIT DESIGNS SHOULD BE | | | PROVIDED, BUT I BELIEVE SOME LEVEL OF PRIVACY NEEDS TO | | | BE ACCOUNTED FOR IN THE DESIGN. | | | | | | 15. [ NO LONGER APPLICABLE ] - WHAT ARE THE ELEVATION | | | DIFFERENCES BETWEEN THE CENTREPARK BOULEVARD PLAZA AREA | | | AND THE FINISHED FLOOR ELEVATION OF THE GROUND FLOOR | | | UNITS/RETAIL? ARE STEPS NEEDED? ACCESSIBLE ROUTES? | | | | | | 16. [ SATISFIED ] - THE LOCATION OF THE BIKE STORAGE | | | AREAS IN THE GARAGE DO NOT SEEM CONDUCIVE FOR USE BY | | | THE RESIDENTS. | | | | | | 17. [ PARTIALLY SATISFIED ] - SETBACKS SHALL BE | | | MEASURED FROM THE PROPERTY LINE TO THE CLOSEST POINT OF | | | THE BUILDING. AS THE FITNESS ROOM EXTEND BEYOND THE | | | WALL OF THE PARKING GARAGE, THE SETBACK SHALL BE | | | MEASURED TO THE EXTERIOR WALL OF THE FITNESS ROOM. | | | | | | 17.1 [ SATISFIED ] - THE BOLD LINE ON THE SITE PLAN | | | DOES NOT APPEAR TO MATCH THE ARCHITECTURAL PLANS, AND | | | THERE APPEARS TO BE STRUCTURAL ELEMENTS EXTENDING INTO | | | THE AREA THAT IS BEING IDENTIFIED AS THE SETBACK. | | | | | | 17.2 [ NEW COMMENT ] - SETBACK SHALL BE PROVIDED FROM | | | THE NORTHEAST CORNER OF THE PARKING GARAGE TO THE | | | ADJACENT PROPERTY LINE. ENSURE THAT THIS DIMENSION IS | | | AT LEAST 5 FEET. | | | | | | 18. [ SATISFIED ] - THE FLOOR PLAN, SITE PLAN, AND | | | ELEVATIONS DO NOT SEEM TO CORRESPOND, NOR SHOW ALL | | | ELEMENTS OF THE BUILDING. THERE IS INCONSISTENCIES IN | | | THE GROUND LEVEL FLOOR PLAN, DECORATIVE FA?ADE | | | ELEMENTS, BALCONIES, STRUCTURAL COLUMNS, ETC. | | | | | | 19. [ NO LONGER APPLICABLE ] - DOES STAIR #1 NEED TO | | | HAVE DIRECT EGRESS TO THE OUTSIDE OF THE BUILDING? THE | | | SITE PLAN SHOWS A DOOR EXITING THE STAIRWELL TO THE | | | CENTREPARK BLVD. PLAZA, BUT THE FLOOR PLAN SHOWS THE | | | FIRE COMMAND CENTER IN THIS LOCATION WITH EGRESS ONLY | | | THROUGH THE LOBBY. | | | | | | 20. [ SATISFIED ] - DESIGN CONSIDERATIONS NEED TO BE | | | MADE FOR THE FACADES OF THE GARAGE THAT FACE THE CANAL | | | AND THE ADJACENT OFFICE BUILDING. | | | | | | 20.1 [ SATISFIED ] - AS DISCUSSED IN RECENT | | | CONVERSATIONS, STAFF NEEDS A BETTER UNDERSTANDING OF | | | THE FACADE OF THE GARAGE, HOW THE LANDSCAPING PLAYS | | | INTO ENHANCING THE FACADE, ETC. AN ARCHITECTURAL | | | RENDERING SHOWING THE DESIGN, LANDSCAPING, ETC. SHALL | | | BE PROVIDED FOR FURTHER REVIEW, AND ENHANCEMENTS TO THE | | | FACADE MAY BE REQUIRED. | | | | | | 21. [ SATISFIED ] - PLEASE NOTE THAT THE PROJECT WILL | | | BE SUBJECT TO THE CENTREPARK AFFORDABLE AND WORKFORCE | | | HOUSING POLICY THAT WAS APPROVED WITH THE ADOPTION OF | | | RESOLUTION NO. 98-17. AS REQUIRED BY THE POLICY, THE | | | APPLICATION SHALL PROVIDE A WRITTEN CERTIFICATION AS | | | PART OF THE SITE PLAN APPLICATION IDENTIFYING WHICH | | | UNITS WILL BE OFFERED AS WORKFORCE HOUSING UNITS. | | | PLEASE REFER TO THE POLICY FOR ALL UNIT RESTRICTIONS | | | THAT ARE REQUIRED. | | | | | | 22. [ SATISIFED - CONDITION OF APPROVAL ] - PLEASE NOTE | | | THAT PURSUANT TO RESOLUTION NO. 98-17, UPON OBTAINING | | | SITE PLAN APPROVAL, THE APPLICANT SHALL CONTRIBUTE | | | $150/UNIT TO THE WORKFORCE HOUSING TRUST FUND, UNLESS | | | THE CITY CHOOSES TO USE IT TOWARD THE DEVELOPMENT OF A | | | TRANSIT PLAN TO PROVIDE CONNECTIVITY BETWEEN DOWNTOWN | | | AND CENTREPARK. IF THIS OPTION IS CHOSEN, THEN THE | | | APPLICANT SHALL WORK WITH THE CITY ON THE DEVELOPMENT | | | OF THIS PLAN. | | | | | | 23. [ PARTIALLY SATISIFED ] - PLEASE NOTE THAT PURSUANT | | | TO SECTION 5, CONDITION #11 OF RESOLUTION NO. 97-17, | | | ALL IRRIGATION SHALL BE PROVIDED UTILIZING THE LAKES | | | (NO POTABLE WATER SHALL BE UTILIZED). PLEASE PROVIDE A | | | NOTE ON THE PLANS INDICATING COMPLIANCE WITH SUCH | | | PROVISION. | | | | | | 23.1 [ NOT SATISFIED ] - THE IRRIGATION NOTE SHOULD BE | | | ADDED TO THE LANDSCAPE PLANS AS WELL. | | | | | | 24. [ SATISFIED ] - PLEASE NOTE THAT PURSUANT TO | | | SECTION 5, CONDITION #13 OF RESOLUTION NO. 97-17, | | | WATER-SAVING PLUMBING FIXTURES SHALL BE INSTALLED | | | THROUGHOUT THE PROJECT. PLEASE PROVIDE A NOTE ON THE | | | PLANS INDICATING COMPLIANCE WITH SUCH PROVISION. | | | | | | 25. [ PARTIALLY SATISFIED ] - PLEASE PROVIDE A TURNING | | | RADIUS ANALYSIS FOR THE UTILIZATION OF THE LOADING AREA | | | AND DUMPSTER/COMPACTOR. | | | | | | 25.1 [ SATISFIED ] - AN ANALYSIS NEEDS TO BE PROVIDED | | | FOR ALL OF THE LOADING AREAS THAT ARE SHOWN (INSIDE THE | | | GARAGE AS WELL AS ALONG THE NORTH SIDE OF THE | | | BUILDING). INGRESS/EGRESS INTO THESE AREAS APPEARS TO | | | BE VERY DIFFICULT, IF EVEN POSSIBLE. | | | | | | 25.2 [ NEW COMMENT ] - TURNING MOVEMENTS FOR THE | | | DUMPSTER SHALL BE APPROVED BY THE CITY'S PUBLIC WORKS | | | DEPARTMENT. | | | | | | 26. [ SATISFIED ] - INTERNAL CONNECTION SHOULD BE | | | PROVIDED BETWEEN THE RESIDENTIAL LOBBY/LEASING AND THE | | | PROPOSED CAFE/RETAIL. | | | | | | 26.1 [ SATISFIED ] - FOR OPTION B, IS THERE ANY WAY TO | | | RELOCATE THE WESTERN ENTRANCE OF THE RETAIL SPACE SO | | | THAT IT CONNECTS WITH THE RESIDENTIAL LOBBY? | | | | | | 27. [ SATISFIED - CONDITION OF APPROVAL ] - MULTIPLE | | | IMPROVEMENTS ARE BEING SHOWN IN THE UTILITY EASEMENT | | | THAT IS ADJACENT TO THE RIGHT-OF-WAY. | | | | | | 28. [ NOT SATISFIED ] - ELEVATIONS INFORMATION NEEDS TO | | | BE PROVIDED FOR ALL STAIRS THAT ARE ENCROACHING INTO A | | | REQUIRED SETBACK. | | | | | | 29. [ SATISFIED ] - BIKE PARKING FACILITIES SHALL BE | | | PROVIDED FOR THE THE NON-RESIDENTIAL USES. | | | | | | 30. [ SATISFIED ] - AS DISCUSSED PREVIIOUSLY, THE | | | COURTYARD NEEDS TO BE FURTHER DESIGNED AND | | | CLARIFICATION NEEDS TO BE MADE ABOUT THE TREATMENT OF | | | THE COURTYARD ADJACENT TO THE TRASH BIN HOLDING AREA, | | | LOADING ZONE, PARKING GARAGE, ETC. | | | | | | 31. [ SATISFIED ] - MORE DETAIL NEEDS TO BE PROVIDED | | | FOR STAFF TO UNDERSTAND THE AREA AT THE NORTHEAST | | | CORNER OF THE BUILDING (TRASH BIN HOLDING AREA, LOADING | | | DOCKS, ROLLING GATE, ETC.). IT IS HARD TO DISTIGUISH | | | WHAT IS WITHIN THE BUILDING VERSUS WHAT IS OUTSIDE. | | | | | | 32. [ SATISFIED ] - ADDITIONAL DETIAL NEEDS TO BE | | | PROVIDED REGARDING THE ROLLING GATE AT THE LOADING | | | DOCKS. IT APPEARS THAT THE GATE BLOCKS A DOORWAY TO THE | | | WEST. DOES THE GATE ROLL TO THE EAST? IF SO, IT MAY | | | ENRCOACH INTO THE PARKING SPACES. | | | | | | 33. [ SATISFIED ] - AS DISCUSSED PREVIOUSLY, STAFF HAS | | | CONCERNS WITH THE OPEN LOADING DOCKS ON THE NORTH SIDE | | | OF THE BUILDING, FACING THE PROPERTY TO THE NORTH. | | | | | | 34. [ SATISFIED - CONDITION OF APPROVAL REGARDING | | | SIGNAGE ] - CLARIFICATION NEEDS TO BE PROVIDED | | | REGARDING THE SECONDARY VEHICULAR ENTRANCE INTO THE | | | GARAGE...IT IS ONLY 15 FEET WIDE. | | | | | | 35. [ SATISFIED ] - A TURN-AROUND SPACE NEEDS TO BE | | | PROVIDED AT THE TOP LEVEL (DEAD-END) OF THE PARKING | | | GARAGE. | | | | | | 36. [ SATISFIED ] - THE BUILDING DOES NOT MEET THE | | | REQUIRED 20 FOOT SETBACK REQUIREMENT OFF OF CENTREPARK | | | BOULEVARD, AND THE JUSTIFICATION STATEMENT DOES NOT | | | APPEAR TO INCLUDE THIS IN THE WAIVERS/AMENDMENT. | | | | | | 37. [ PARTIALLY SATISFIED ] - AS DISCUSSED PREVIOUSLY, | | | GROUND FLOOR UNITS SHALL HAVE DIRECT ACCESS TO THE | | | PUBLIC WALKWAY, AS WELL AS THE OPEN SPACE TO THE WEST | | | ALONG THE CANAL. | | | | | | 37.1 [ NEW COMMENT ] - CAN THE ALTERNATIVE BE SHOWN ON | | | THE SITE PLAN AS WELL? | | | | | | 38. [ PARTIALLY SATISFIED ] - AS DISCUSSED PREVIOUSLY, | | | A PEDESTRIAN PATHWAY OR RECREATION TRAIL WITH | | | LANDSCAPING, SEATING AREAS, ETC. SHALL BE PROVIDED | | | ALONG THE CANAL, CONNECTING CENTREPARK BOULEVARD WITH | | | CENTREPARK DRIVE NORTH/EAST TO CREATE A NETWORK OF | | | AMENITIES FOR USE BY RESIDENTS, ETC. | | | | | | 38.1 [ NEW COMMENT ] - STAFF WOULD LIKE TO DISCUSS THE | | | EXTENSION OF THE PROPOSED WALKWAY ALL THE WAY TO | | | CENTREPARK DRIVE NORTH. | | | | | | 39. [ SATISFIED ] - STAFF WOULD LIKE TO DISCUSS THE | | | APPLICANT'S PROPOSED MITIGATION STRATEGY FOR THE SHADE | | | TREE WAIVER. WHAT OFF-SITE LOCATIONS ARE PROPOSED? HAS | | | ANY CONSIDERATION BEEN MADE TO ENHANCE THE MEDIAN IN | | | AUSTRALIAN AVENUE AT CENTREPARK'S MAIN ENTRANCE? | | | ________________________________________ | | | | | | PLEASE NOTE THE FOLLOWING WHEN RESUBMITTING: | | | | | | A) WRITTEN RESPONSES TO COMMENTS MADE BY ALL | | | DEPARTMENTS SHALL BE PROVIDED UPON RESUBMISSION. | | | | | | B) 15 SETS OF REVISED PLANS AND/OR DOCUMENTS SHALL BE | | | PROVIDED, ALONG WITH ONE (1) REDUCED COPY (11IN X | | | 17IN), AND AN ELECTRONIC COPY OF ALL PLANS. | | | | | | C) PLEASE NOTE THAT RE-SUBMITTALS MAY BE SUBJECT TO | | | ADDITIONAL COMMENTS. | | | | | | D) IF NO RESPONSE IS RECEIVED WITHIN 60 DAYS OF THE | | | ISSUANCE OF THESE COMMENTS, THE APPLICATION WILL BE | | | CONSIDERED WITHDRAWN AND ANY FURTHER ACTION WILL | | | REQUIRE SUBMISSION OF A NEW DEVELOPMENT APPLICATION. | | | | | | E) PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20% OF THE ORIGINAL APPLICATION FEE. | | | | | | F) IN ORDER TO BE CONSIDERED FOR THE NOVEMBER 17, 2020, | | | PLANNING BOARD AGENDA, ALL COMMENTS SHALL BE | | | SATISFACTORILY ADDRESSED. PLEASE SUBMIT ALL REVISED | | | DOCUMENTS/PLANS NO LATER THAN SEPTEMBER 25, 2020. | | | | | | G) TO BE PLACED ON THE NOVEMBER 17, 2020, PLANNING | | | BOARD AGENDA, SIGNS SHALL BE POSTED ON THE PROPERTY NO | | | LATER THAN NOVEMBER 2, 2020. SIGNAGE SHALL CONFORM, AND | | | BE INSTALLED ACCORDING TO THE REQUIREMENTS OF THE | | | CITY?S ZONING AND LAND DEVELOPMENT REGULATIONS; SUCH | | | REQUIREMENTS ARE ALSO PROVIDED IN THE DEVELOPMENT | | | APPLICATION. A SIGNED AND NOTARIZED AFFIDAVIT SHALL BE | | | PROVIDED BY THE DEADLINE REFERENCED ABOVE. | | | | | | H) IF AFTER THE CASE HAS BEEN ADVERTISED THE APPLICANT | | | DESIRES TO REQUEST A CONTINUANCE, A FEE OF $50 PLUS THE | | | COST OF ADVERTISING WILL BE CHARGED. | | | ________________________________________ | | | | | | QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING: | | | | | | JOHN P. ROACH, AICP, PRINCIPAL PLANNER | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION | | | 401 CLEMATIS STREET - P.O. BOX 3147 | | | WEST PALM BEACH, FLORIDA 33402 | | | | | | P: 561.822.1448 | | | TTY: 800.955.8771 | | | E: [email protected] | | | | | | W: WPB.ORG | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
07-09-2020 |
|
|
Cont ID |
|
| Sent By |
jroach |
Date |
07-09-2020 |
Time |
09:43 |
Rev Time |
0.00 |
| Received By |
jroach |
Date |
07-09-2020 |
Time |
09:43 |
Sent To |
|
|
| Notes |
| 2020-07-09 11:07:03 | PLANS AND PLATS REVIEW COMMITTEE (PPRC) ZONING REVIEW | | | ________________________________________ | | | | | | DATE OF REVIEW: JULY 9, 2020 | | | PROJECT NO.: Z19110010 | | | CASE NO.: PB 791II | | | ________________________________________ | | | | | | PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING | | | REVIEW COMMENTS: | | | | | | 1. [ PARTIALLY SATISFIED ] - PLEASE CLARIFY THE | | | METHODOLOGY REGARDING THE PARKING CALCULATION. A SHARED | | | PARKING CALCULATION IS BEING USED, BUT A PARKING STUDY | | | HAS ALSO BEEN PROVIDED TO JUSTIFY A FURTHER REDUCTION | | | IN THE REQUIRED PARKING. AS SUCH, THE APPLICATION WOULD | | | NEED TO BE AMENDED TO SHOW THAT A PARKING WAIVER IS | | | BEING REQUESTED. PARKING WAIVERS WITHIN A PLANNED | | | DEVELOPMENT SHALL COMPLY WITH SEC. 94-207(B)(13) OF THE | | | CITY?S ZLDRS. | | | | | | 1.1 [ NEW COMMENT ] - STAFF WOULD LIKE CLARIFICATION OR | | | HAVE FURTHER DISCUSSION TO UNDERSTAND THE SHARED | | | PARKING CALCUALTION THAT IS BEING SHOWN. | | | | | | 2. [ NOT SATISFIED ] - PLEASE PROVIDE CLARIFICATION AS | | | TO HOW THE CONFLICTS WITH FPL, AS STATED IN THEIR | | | LETTER (NOVEMBER 5, 2019) WILL BE ADDRESSED. | | | | | | 2.1 [ NEW COMMENT ] - A PORTION OF THE BUILDING IS | | | SHOWN ENROACHING INTO AN EXISTING FPL EASEMENT NEAR THE | | | INTERSECTION. | | | | | | 3. [ SATISFIED ] - SITE PLAN SHALL IDENTIFY THE | | | VISIBILITY TRIANGLE AT THE CORNER OF CENTREPARK | | | BOULEVARD AND CENTREPARK DRIVE EAST. NO ENCROACHMENTS | | | BETWEEN 18 INCHES AND EIGHT (8) FEET SHALL BE WITHIN | | | THIS AREA. | | | | | | 4. [ PARTIALLY SATISFIED ] - PLEASE PROVIDE | | | CLARIFICATION ON HOW TRASH WILL BE MANAGED AND PICKED | | | UP. | | | | | | 4.1. [ NEW COMMENT ] - PLEASE PROVIDE CONFIRMATION FROM | | | THE CITY'S PUBLIC WORKS DEPARTMENT THAT PROVIDED | | | PICK-UP WILL BE PERMITTED. | | | | | | 5. [ PARTIALLY SATISFIED ] - PARKING DETAIL ON SHEET | | | SP-1 IS INCORRECT. | | | | | | 5.1. [ SATISFIED ] - THE NOTE INDICATES TWO (2) FEET TO | | | THE BACK OF THE WHEEL STOP, BUT THE DIMENSION LINE | | | INDICATES THREE (3) FEET. | | | | | | 5.2. [ SATISFIED ] - THE LENGTH OF THE STALL IS | | | DIMENSIONED AT 28 FEET; THIS SHOULD BE 18 FEET. | | | | | | 5.3. [ SATISFIED ] - THE WIDTH OF THE HANDICAP STALL IS | | | DIMENSIONED AT 19 FEET; THIS SHOULD BE 12 FEET. | | | | | | 5.4. [ SATISIFIED ] - THE WIDTH OF THE HANDICAP AISLE | | | IS DIMENSIONED AT EIGHT (8) FEET; THIS SHOULD BE FIVE | | | (5) FEET. | | | | | | 5.5 [ NEW COMMENT ] - THE STRIPING FOR THE HANDICAP | | | ACCESS AISLE IS INCORRECT. | | | | | | 6. [ SATISFIED ] - THE PARKING CONFIGURATION SHOWN ON | | | THE SITE PLAN DOES NOT MATCH THE ARCHITECTURAL PLANS. | | | | | | 7. [ NOT SATISFIED ] - THERE APPEARS TO BE A NUMBER OF | | | LOCATIONS WHERE THE STRUCTURAL COLUMNS ARE ENCROACHING | | | INTO THE PARKING STALL. THE COLUMNS SHALL BE CONTAINED | | | ENTIRELY WITHIN THE DOUBLE-STRIPE AND NOT IMPEDE ON THE | | | MINIMUM WIDTH OF THE STALL. A DETAIL MAY NEED TO BE | | | PROVIDED. | | | | | | 7.1. [ NEW COMMENT ] - ENCROACHMENTS ARE STILL SHOWN. A | | | DETAIL SHALL BE PROVIDED. | | | | | | 8. [ NO LONGER APPLICABLE ] - THE AMENITIES PROVIDED IN | | | THE DETENTION AREA HAVE NO ACCESS TO RESIDENTS/PATRONS | | | OF THE BUILDING. THE ONLY SIDEWALK THAT CONNECT TO THE | | | PATHWAY IS THAT WHICH HAS ACCESS TO THE TRACH ROOM, FPL | | | VAULT, FIRE PUMP, ETC. ACCESS SHALL BE PROVIDE TO THE | | | PUBLIC WALKWAY, CAF? AND/OR LOBBY AND LEASING AREA. | | | | | | 9. [ NO LONGER APPLICABLE ] - TANDEM PARKING SPACES | | | ONLY WORK IF THEY ARE ASSIGNED TO SPECIFIC UNITS. AS | | | SUCH, THESE SPACES CANNOT BE CONSIDERED TOWARD THE | | | SHARED PARKING CALCULATION AS THEY WOULD NOT BE | | | AVAILABLE FOR USE BY MULTIPLE OWNERS/TENANTS. | | | | | | 10. [ NO LONGER APPLICABLE ] - TANDEM PARKING SPACES | | | SHALL NOT HAVE WHEEL STOPS IN BETWEEN THE TWO SPACES. | | | | | | 11. [ NO LONGER APPLICABLE ] - THERE'S SOME CONCERN | | | WITH REGARDING THE SINGLE PARKING SPACE IMMEDIATELY | | | ADJACENT TO THE LOADING AREA ON THE FIRST LEVEL AS IT | | | SEEMS THAT IT WOULD RESULT IN CONFLICTS IN INCOMING | | | VEHICLES AS THE SPACE IS CONCEALED BEHIND THE WALL. | | | | | | 12. [ NO LONGER APPLICABLE ] - THERE APPEARS TO BE | | | INSUFFICIENT BACK-OUT SPACE OF THE FIRST PARKING SPACE | | | AS YOU ENTER THE GARAGE ON THE FIRST LEVEL (NORTH | | | SIDE). | | | | | | 13. [ PARTIALLY SATISIFED ] - DIMENSIONS OF BALCONY | | | ENCROACHMENTS SHALL BE PROVIDED. BALCONIES SHALL NOT | | | PROJECT MORE THAN THREE (3) FEET INTO ANY REQUIRED | | | SETBACK. | | | | | | 13.1 [ NEW COMMENT ] - DIMENSIONS NEED TO BE PROVIDED | | | FOR ALL BALCONIES, ETC. THAT ARE ENCROACHING INTO A | | | SETBACK. | | | | | | 14. [ NO LONGER APPLICABLE ] - STAFF DOESN?T QUITE | | | UNDERSTAND THE CONCEPT OF HAVING THE ?PLAZA? DESIGN IN | | | FRONT OF THE GROUND FLOOR RESIDENTIAL UNITS ALONG | | | CENTREPARK BLVD. WALK-UP UNIT DESIGNS SHOULD BE | | | PROVIDED, BUT I BELIEVE SOME LEVEL OF PRIVACY NEEDS TO | | | BE ACCOUNTED FOR IN THE DESIGN. | | | | | | 15. [ NO LONGER APPLICABLE ] - WHAT ARE THE ELEVATION | | | DIFFERENCES BETWEEN THE CENTREPARK BOULEVARD PLAZA AREA | | | AND THE FINISHED FLOOR ELEVATION OF THE GROUND FLOOR | | | UNITS/RETAIL? ARE STEPS NEEDED? ACCESSIBLE ROUTES? | | | | | | 16. [ SATISFIED ] - THE LOCATION OF THE BIKE STORAGE | | | AREAS IN THE GARAGE DO NOT SEEM CONDUCIVE FOR USE BY | | | THE RESIDENTS. | | | | | | 17. [ PARTIALLY SATISFIED ] - SETBACKS SHALL BE | | | MEASURED FROM THE PROPERTY LINE TO THE CLOSEST POINT OF | | | THE BUILDING. AS THE FITNESS ROOM EXTEND BEYOND THE | | | WALL OF THE PARKING GARAGE, THE SETBACK SHALL BE | | | MEASURED TO THE EXTERIOR WALL OF THE FITNESS ROOM. | | | | | | 17.1 [ NEW COMMENT ] - THE BOLD LINE ON THE SITE PLAN | | | DOES NOT APPEAR TO MATCH THE ARCHITECTURAL PLANS, AND | | | THERE APPEARS TO BE STRUCTURAL ELEMENTS EXTENDING INTO | | | THE AREA THAT IS BEING IDENTIFIED AS THE SETBACK. | | | | | | 18. [ SATISFIED ] - THE FLOOR PLAN, SITE PLAN, AND | | | ELEVATIONS DO NOT SEEM TO CORRESPOND, NOR SHOW ALL | | | ELEMENTS OF THE BUILDING. THERE IS INCONSISTENCIES IN | | | THE GROUND LEVEL FLOOR PLAN, DECORATIVE FA?ADE | | | ELEMENTS, BALCONIES, STRUCTURAL COLUMNS, ETC. | | | | | | 19. [ NO LONGER APPLICABLE ] - DOES STAIR #1 NEED TO | | | HAVE DIRECT EGRESS TO THE OUTSIDE OF THE BUILDING? THE | | | SITE PLAN SHOWS A DOOR EXITING THE STAIRWELL TO THE | | | CENTREPARK BLVD. PLAZA, BUT THE FLOOR PLAN SHOWS THE | | | FIRE COMMAND CENTER IN THIS LOCATION WITH EGRESS ONLY | | | THROUGH THE LOBBY. | | | | | | 20. [ NOT SATISFIED ] - DESIGN CONSIDERATIONS NEED TO | | | BE MADE FOR THE FACADES OF THE GARAGE THAT FACE THE | | | CANAL AND THE ADJACENT OFFICE BUILDING. | | | | | | 20.1 [ NEW COMMENT ] - AS DISCUSSED IN RECENT | | | CONVERSATIONS, STAFF NEEDS A BETTER UNDERSTANDING OF | | | THE FACADE OF THE GARAGE, HOW THE LANDSCAPING PLAYS | | | INTO ENHANCING THE FACADE, ETC. AN ARCHITECTURAL | | | RENDERING SHOWING THE DESIGN, LANDSCAPING, ETC. SHALL | | | BE PROVIDED FOR FURTHER REVIEW, AND ENHANCEMENTS TO THE | | | FACADE MAY BE REQUIRED. | | | | | | 21. [ SATISFIED ] - PLEASE NOTE THAT THE PROJECT WILL | | | BE SUBJECT TO THE CENTREPARK AFFORDABLE AND WORKFORCE | | | HOUSING POLICY THAT WAS APPROVED WITH THE ADOPTION OF | | | RESOLUTION NO. 98-17. AS REQUIRED BY THE POLICY, THE | | | APPLICATION SHALL PROVIDE A WRITTEN CERTIFICATION AS | | | PART OF THE SITE PLAN APPLICATION IDENTIFYING WHICH | | | UNITS WILL BE OFFERED AS WORKFORCE HOUSING UNITS. | | | PLEASE REFER TO THE POLICY FOR ALL UNIT RESTRICTIONS | | | THAT ARE REQUIRED. | | | | | | 22. [ NOT SATISIFED ] - PLEASE NOTE THAT PURSUANT TO | | | RESOLUTION NO. 98-17, UPON OBTAINING SITE PLAN | | | APPROVAL, THE APPLICANT SHALL CONTRIBUTE $150/UNIT TO | | | THE WORKFORCE HOUSING TRUST FUND, UNLESS THE CITY | | | CHOOSES TO USE IT TOWARD THE DEVELOPMENT OF A TRANSIT | | | PLAN TO PROVIDE CONNECTIVITY BETWEEN DOWNTOWN AND | | | CENTREPARK. IF THIS OPTION IS CHOSEN, THEN THE | | | APPLICANT SHALL WORK WITH THE CITY ON THE DEVELOPMENT | | | OF THIS PLAN. | | | | | | 23. [ PARTIALLY SATISIFED ] - PLEASE NOTE THAT PURSUANT | | | TO SECTION 5, CONDITION #11 OF RESOLUTION NO. 97-17, | | | ALL IRRIGATION SHALL BE PROVIDED UTILIZING THE LAKES | | | (NO POTABLE WATER SHALL BE UTILIZED). PLEASE PROVIDE A | | | NOTE ON THE PLANS INDICATING COMPLIANCE WITH SUCH | | | PROVISION. | | | | | | 23.1 [ NEW COMMENT ] - THE IRRIGATION NOTE SHOULD BE | | | ADDED TO THE LANDSCAPE PLANS AS WELL. | | | | | | 24. [ NOT SATISFIED ] - PLEASE NOTE THAT PURSUANT TO | | | SECTION 5, CONDITION #13 OF RESOLUTION NO. 97-17, | | | WATER-SAVING PLUMBING FIXTURES SHALL BE INSTALLED | | | THROUGHOUT THE PROJECT. PLEASE PROVIDE A NOTE ON THE | | | PLANS INDICATING COMPLIANCE WITH SUCH PROVISION. | | | | | | 25. [ NOT SATISFIED ] - PLEASE PROVIDE A TURNING RADIUS | | | ANALYSIS FOR THE UTILIZATION OF THE LOADING AREA AND | | | DUMPSTER/COMPACTOR. | | | | | | 25.1 [ NEW COMMENT ] - AN ANALYSIS NEEDS TO BE PROVIDED | | | FOR ALL OF THE LOADING AREAS THAT ARE SHOWN (INSIDE THE | | | GARAGE AS WELL AS ALONG THE NORTH SIDE OF THE | | | BUILDING). INGRESS/EGRESS INTO THESE AREAS APPEARS TO | | | BE VERY DIFFICULT, IF EVEN POSSIBLE. | | | | | | 26. [ PARTIALLY SATISFIED ] - INTERNAL CONNECTION | | | SHOULD BE PROVIDED BETWEEN THE RESIDENTIAL | | | LOBBY/LEASING AND THE PROPOSED CAFE/RETAIL. | | | | | | 26.1 [ NEW COMMENT ] - FOR OPTION B, IS THERE ANY WAY | | | TO RELOCATE THE WESTERN ENTRANCE OF THE RETAIL SPACE SO | | | THAT IT CONNECTS WITH THE RESIDENTIAL LOBBY? | | | | | | 27. [ NEW COMMENT ] - MULTIPLE IMPROVEMENTS ARE BEING | | | SHOWN IN THE UTILITY EASEMENT THAT IS ADJACENT TO THE | | | RIGHT-OF-WAY. | | | | | | 28. [ NEW COMMENT ] - ELEVATIONS INFORMATION NEEDS TO | | | BE PROVIDED FOR ALL STAIRS THAT ARE ENCROACHING INTO A | | | REQUIRED SETBACK. | | | | | | 29. [ NEW COMMENT ] - BIKE PARKING FACILITIES SHALL BE | | | PROVIDED FOR THE THE NON-RESIDENTIAL USES. | | | | | | 30. [ NEW COMMENT ] - AS DISCUSSED PREVIIOUSLY, THE | | | COURTYARD NEEDS TO BE FURTHER DESIGNED AND | | | CLARIFICATION NEEDS TO BE MADE ABOUT THE TREATMENT OF | | | THE COURTYARD ADJACENT TO THE TRASH BIN HOLDING AREA, | | | LOADING ZONE, PARKING GARAGE, ETC. | | | | | | 31. [ NEW COMMENT ] - MORE DETAIL NEEDS TO BE PROVIDED | | | FOR STAFF TO UNDERSTAND THE AREA AT THE NORTHEAST | | | CORNER OF THE BUILDING (TRASH BIN HOLDING AREA, LOADING | | | DOCKS, ROLLING GATE, ETC.). IT IS HARD TO DISTIGUISH | | | WHAT IS WITHIN THE BUILDING VERSUS WHAT IS OUTSIDE. | | | | | | 32. [ NEW COMMENT ] - ADDITIONAL DETIAL NEEDS TO BE | | | PROVIDED REGARDING THE ROLLING GATE AT THE LOADING | | | DOCKS. IT APPEARS THAT THE GATE BLOCKS A DOORWAY TO THE | | | WEST. DOES THE GATE ROLL TO THE EAST? IF SO, IT MAY | | | ENRCOACH INTO THE PARKING SPACES. | | | | | | 33. [ NEW COMMENT ] - AS DISCUSSED PREVIOUSLY, STAFF | | | HAS CONCERNS WITH THE OPEN LOADING DOCKS ON THE NORTH | | | SIDE OF THE BUILDING, FACING THE PROPERTY TO THE NORTH. | | | | | | 34. [ NEW COMMENT ] - CLARIFICATION NEEDS TO BE | | | PROVIDED REGARDING THE SECONDARY VEHICULAR ENTRANCE | | | INTO THE GARAGE...IT IS ONLY 15 FEET WIDE. | | | | | | 35. [ NEW COMMENT ] - A TURN-AROUND SPACE NEEDS TO BE | | | PROVIDED AT THE TOP LEVEL (DEAD-END) OF THE PARKING | | | GARAGE. | | | | | | 36. [ NEW COMMENT ] - THE BUILDING DOES NOT MEET THE | | | REQUIRED 20 FOOT SETBACK REQUIREMENT OFF OF CENTREPARK | | | BOULEVARD, AND THE JUSTIFICATION STATEMENT DOES NOT | | | APPEAR TO INCLUDE THIS IN THE WAIVERS/AMENDMENT. | | | | | | 37. [ NEW COMMENT ] - AS DISCUSSED PREVIOUSLY, GROUND | | | FLOOR UNITS SHALL HAVE DIRECT ACCESS TO THE PUBLIC | | | WALKWAY, AS WELL AS THE OPEN SPACE TO THE WEST ALONG | | | THE CANAL. | | | | | | 38. [ NEW COMMENT ] - AS DISCUSSED PREVIOUSLY, A | | | PEDESTRIAN PATHWAY OR RECREATION TRAIL WITH | | | LANDSCAPING, SEATING AREAS, ETC. SHALL BE PROVIDED | | | ALONG THE CANAL, CONNECTING CENTREPARK BOULEVARD WITH | | | CENTREPARK DRIVE NORTH/EAST TO CREATE A NETWORK OF | | | AMENITIES FOR USE BY RESIDENTS, ETC. | | | | | | 39. [ NEW COMMENT ] - STAFF WOULD LIKE TO DISCUSS THE | | | APPLICANT'S PROPOSED MITIGATION STRATEGY FOR THE SHADE | | | TREE WAIVER. WHAT OFF-SITE LOCATIONS ARE PROPOSED? HAS | | | ANY CONSIDERATION BEEN MADE TO ENHANCE THE MEDIAN IN | | | AUSTRALIAN AVENUE AT CENTREPARK'S MAIN ENTRANCE? | | | ________________________________________ | | | | | | PLEASE NOTE THE FOLLOWING WHEN RESUBMITTING: | | | | | | A) WRITTEN RESPONSES TO COMMENTS MADE BY ALL | | | DEPARTMENTS SHALL BE PROVIDED UPON RESUBMISSION. | | | | | | B) 15 SETS OF REVISED PLANS AND/OR DOCUMENTS SHALL BE | | | PROVIDED, ALONG WITH ONE (1) REDUCED COPY (11IN X | | | 17IN), AND AN ELECTRONIC COPY OF ALL PLANS. | | | | | | C) PLEASE NOTE THAT RE-SUBMITTALS MAY BE SUBJECT TO | | | ADDITIONAL COMMENTS. | | | | | | D) IF NO RESPONSE IS RECEIVED WITHIN 60 DAYS OF THE | | | ISSUANCE OF THESE COMMENTS, THE APPLICATION WILL BE | | | CONSIDERED WITHDRAWN AND ANY FURTHER ACTION WILL | | | REQUIRE SUBMISSION OF A NEW DEVELOPMENT APPLICATION. | | | | | | E) PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20% OF THE ORIGINAL APPLICATION FEE. | | | | | | F) IN ORDER TO BE CONSIDERED FOR THE SEPTEMBER 15, | | | 2020, PLANNING BOARD AGENDA, ALL COMMENTS SHALL BE | | | SATISFACTORILY ADDRESSED. PLEASE SUBMIT ALL REVISED | | | DOCUMENTS/PLANS NO LATER THAN JULY 24, 2020. | | | | | | G) TO BE PLACED ON THE SEPTEMBER 15, 2020, PLANNING | | | BOARD AGENDA, SIGNS SHALL BE POSTED ON THE PROPERTY NO | | | LATER THAN AUGUST 31, 2020. SIGNAGE SHALL CONFORM, AND | | | BE INSTALLED ACCORDING TO THE REQUIREMENTS OF THE | | | CITY?S ZONING AND LAND DEVELOPMENT REGULATIONS; SUCH | | | REQUIREMENTS ARE ALSO PROVIDED IN THE DEVELOPMENT | | | APPLICATION. A SIGNED AND NOTARIZED AFFIDAVIT SHALL BE | | | PROVIDED BY THE DEADLINE REFERENCED ABOVE. | | | | | | H) IF AFTER THE CASE HAS BEEN ADVERTISED THE APPLICANT | | | DESIRES TO REQUEST A CONTINUANCE, A FEE OF $50 PLUS THE | | | COST OF ADVERTISING WILL BE CHARGED. | | | ________________________________________ | | | | | | QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING: | | | | | | JOHN P. ROACH, AICP, PRINCIPAL PLANNER | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION | | | 401 CLEMATIS STREET - P.O. BOX 3147 | | | WEST PALM BEACH, FLORIDA 33402 | | | | | | P: 561.822.1448 | | | TTY: 800.955.8771 | | | E: [email protected] | | | | | | W: WPB.ORG | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
12-11-2019 |
|
|
Cont ID |
|
| Sent By |
jroach |
Date |
12-11-2019 |
Time |
11:10 |
Rev Time |
0.00 |
| Received By |
jroach |
Date |
12-11-2019 |
Time |
11:10 |
Sent To |
|
|
| Notes |
| 2019-12-11 11:11:26 | PLANS AND PLATS REVIEW COMMITTEE (PPRC) ZONING REVIEW | | | ________________________________________ | | | | | | DATE OF REVIEW: 12.11.2019 | | | PROJECT NO.: Z19110010 | | | CASE NO.: PB 791II | | | ________________________________________ | | | | | | PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING | | | REVIEW COMMENTS: | | | | | | 1. PLEASE CLARIFY THE METHODOLOGY REGARDING THE PARKING | | | CALCULATION. A SHARED PARKING CALCULATION IS BEING | | | USED, BUT A PARKING STUDY HAS ALSO BEEN PROVIDED TO | | | JUSTIFY A FURTHER REDUCTION IN THE REQUIRED PARKING. AS | | | SUCH, THE APPLICATION WOULD NEED TO BE AMENDED TO SHOW | | | THAT A PARKING WAIVER IS BEING REQUESTED. PARKING | | | WAIVERS WITHIN A PLANNED DEVELOPMENT SHALL COMPLY WITH | | | SEC. 94-207(B)(13) OF THE CITY?S ZLDRS. | | | | | | 2. PLEASE PROVIDE CLARIFICATION AS TO HOW THE CONFLICTS | | | WITH FPL, AS STATED IN THEIR LETTER (NOVEMBER 5, 2019) | | | WILL BE ADDRESSED. | | | | | | 3. SITE PLAN SHALL IDENTIFY THE VISIBILITY TRIANGLE AT | | | THE CORNER OF CENTREPARK BOULEVARD AND CENTREPARK DRIVE | | | EAST. NO ENCROACHMENTS BETWEEN 18 INCHES AND EIGHT (8) | | | FEET SHALL BE WITHIN THIS AREA. | | | | | | 4. PLEASE PROVIDE CLARIFICATION ON HOW TRASH WILL BE | | | MANAGED AND PICKED UP. | | | | | | 5. PARKING DETAIL ON SHEET SP-1 IS INCORRECT. | | | | | | 5.1. THE NOTE INDICATES TWO (2) FEET TO THE BACK OF THE | | | WHEEL STOP, BUT THE DIMENSION LINE INDICATES THREE (3) | | | FEET. | | | | | | 5.2. THE LENGTH OF THE STALL IS DIMENSIONED AT 28 FEET; | | | THIS SHOULD BE 18 FEET. | | | | | | 5.3. THE WIDTH OF THE HANDICAP STALL IS DIMENSIONED AT | | | 19 FEET; THIS SHOULD BE 12 FEET. | | | | | | 5.4. THE WIDTH OF THE HANDICAP AISLE IS DIMENSIONED AT | | | EIGHT (8) FEET; THIS SHOULD BE FIVE (5) FEET. | | | | | | 6. THE PARKING CONFIGURATION SHOWN ON THE SITE PLAN | | | DOES NOT MATCH THE ARCHITECTURAL PLANS. | | | | | | 7. THERE APPEARS TO BE A NUMBER OF LOCATIONS WHERE THE | | | STRUCTURAL COLUMNS ARE ENCROACHING INTO THE PARKING | | | STALL. THE COLUMNS SHALL BE CONTAINED ENTIRELY WITHIN | | | THE DOUBLE-STRIPE AND NOT IMPEDE ON THE MINIMUM WIDTH | | | OF THE STALL. A DETAIL MAY NEED TO BE PROVIDED. | | | | | | 8. THE AMENITIES PROVIDED IN THE DETENTION AREA HAVE NO | | | ACCESS TO RESIDENTS/PATRONS OF THE BUILDING. THE ONLY | | | SIDEWALK THAT CONNECT TO THE PATHWAY IS THAT WHICH HAS | | | ACCESS TO THE TRACH ROOM, FPL VAULT, FIRE PUMP, ETC. | | | ACCESS SHALL BE PROVIDE TO THE PUBLIC WALKWAY, CAF? | | | AND/OR LOBBY AND LEASING AREA. | | | | | | 9. TANDEM PARKING SPACES ONLY WORK IF THEY ARE ASSIGNED | | | TO SPECIFIC UNITS. AS SUCH, THESE SPACES CANNOT BE | | | CONSIDERED TOWARD THE SHARED PARKING CALCULATION AS | | | THEY WOULD NOT BE AVAILABLE FOR USE BY MULTIPLE | | | OWNERS/TENANTS. | | | | | | 10. TANDEM PARKING SPACES SHALL NOT HAVE WHEEL STOPS IN | | | BETWEEN THE TWO SPACES. | | | | | | 11. THERE?S SOME CONCERN WITH REGARDING THE SINGLE | | | PARKING SPACE IMMEDIATELY ADJACENT TO THE LOADING AREA | | | ON THE FIRST LEVEL AS IT SEEMS THAT IT WOULD RESULT IN | | | CONFLICTS IN INCOMING VEHICLES AS THE SPACE IS | | | CONCEALED BEHIND THE WALL. | | | | | | 12. THERE APPEARS TO BE INSUFFICIENT BACK-OUT SPACE OF | | | THE FIRST PARKING SPACE AS YOU ENTER THE GARAGE ON THE | | | FIRST LEVEL (NORTH SIDE). | | | | | | 13. DIMENSIONS OF BALCONY ENCROACHMENTS SHALL BE | | | PROVIDED. BALCONIES SHALL NOT PROJECT MORE THAN THREE | | | (3) FEET INTO ANY REQUIRED SETBACK. | | | | | | 14. STAFF DOESN?T QUITE UNDERSTAND THE CONCEPT OF | | | HAVING THE ?PLAZA? DESIGN IN FRONT OF THE GROUND FLOOR | | | RESIDENTIAL UNITS ALONG CENTREPARK BLVD. WALK-UP UNIT | | | DESIGNS SHOULD BE PROVIDED, BUT I BELIEVE SOME LEVEL OF | | | PRIVACY NEEDS TO BE ACCOUNTED FOR IN THE DESIGN. | | | | | | 15. WHAT ARE THE ELEVATION DIFFERENCES BETWEEN THE | | | CENTREPARK BOULEVARD PLAZA AREA AND THE FINISHED FLOOR | | | ELEVATION OF THE GROUND FLOOR UNITS/RETAIL? ARE STEPS | | | NEEDED? ACCESSIBLE ROUTES? | | | | | | 16. THE LOCATION OF THE BIKE STORAGE AREAS IN THE | | | GARAGE DO NOT SEEM CONDUCIVE FOR USE BY THE RESIDENTS. | | | | | | 17. SETBACKS SHALL BE MEASURED FROM THE PROPERTY LINE | | | TO THE CLOSEST POINT OF THE BUILDING. AS THE FITNESS | | | ROOM EXTEND BEYOND THE WALL OF THE PARKING GARAGE, THE | | | SETBACK SHALL BE MEASURED TO THE EXTERIOR WALL OF THE | | | FITNESS ROOM. | | | | | | 18. THE FLOOR PLAN, SITE PLAN, AND ELEVATIONS DO NOT | | | SEEM TO CORRESPOND, NOR SHOW ALL ELEMENTS OF THE | | | BUILDING. THERE IS INCONSISTENCIES IN THE GROUND LEVEL | | | FLOOR PLAN, DECORATIVE FA?ADE ELEMENTS, BALCONIES, | | | STRUCTURAL COLUMNS, ETC. | | | | | | 19. DOES STAIR #1 NEED TO HAVE DIRECT EGRESS TO THE | | | OUTSIDE OF THE BUILDING? THE SITE PLAN SHOWS A DOOR | | | EXITING THE STAIRWELL TO THE CENTREPARK BLVD. PLAZA, | | | BUT THE FLOOR PLAN SHOWS THE FIRE COMMAND CENTER IN | | | THIS LOCATION WITH EGRESS ONLY THROUGH THE LOBBY. | | | | | | 20. DESIGN CONSIDERATIONS NEED TO BE MADE FOR THE | | | FACADES OF THE GARAGE THAT FACE THE CANAL AND THE | | | ADJACENT OFFICE BUILDING. | | | | | | 21. PLEASE NOTE THAT THE PROJECT WILL BE SUBJECT TO THE | | | CENTREPARK AFFORDABLE AND WORKFORCE HOUSING POLICY THAT | | | WAS APPROVED WITH THE ADOPTION OF RESOLUTION NO. 98-17. | | | AS REQUIRED BY THE POLICY, THE APPLICATION SHALL | | | PROVIDE A WRITTEN CERTIFICATION AS PART OF THE SITE | | | PLAN APPLICATION IDENTIFYING WHICH UNITS WILL BE | | | OFFERED AS WORKFORCE HOUSING UNITS. PLEASE REFER TO THE | | | POLICY FOR ALL UNIT RESTRICTIONS THAT ARE REQUIRED. | | | | | | 22. PLEASE NOTE THAT PURSUANT TO RESOLUTION NO. 98-17, | | | UPON OBTAINING SITE PLAN APPROVAL, THE APPLICANT SHALL | | | CONTRIBUTE $150/UNIT TO THE WORKFORCE HOUSING TRUST | | | FUND, UNLESS THE CITY CHOOSES TO USE IT TOWARD THE | | | DEVELOPMENT OF A TRANSIT PLAN TO PROVIDE CONNECTIVITY | | | BETWEEN DOWNTOWN AND CENTREPARK. IF THIS OPTION IS | | | CHOSEN, THEN THE APPLICANT SHALL WORK WITH THE CITY ON | | | THE DEVELOPMENT OF THIS PLAN. | | | | | | 23. PLEASE NOTE THAT PURSUANT TO SECTION 5, CONDITION | | | #11 OF RESOLUTION NO. 97-17, ALL IRRIGATION SHALL BE | | | PROVIDED UTILIZING THE LAKES (NO POTABLE WATER SHALL BE | | | UTILIZED). PLEASE PROVIDE A NOTE ON THE PLANS | | | INDICATING COMPLIANCE WITH SUCH PROVISION. | | | | | | 24. PLEASE NOTE THAT PURSUANT TO SECTION 5, CONDITION | | | #13 OF RESOLUTION NO. 97-17, WATER-SAVING PLUMBING | | | FIXTURES SHALL BE INSTALLED THROUGHOUT THE PROJECT. | | | PLEASE PROVIDE A NOTE ON THE PLANS INDICATING | | | COMPLIANCE WITH SUCH PROVISION. | | | | | | 25. PLEASE PROVIDE A TURNING RADIUS ANALYSIS FOR THE | | | UTILIZATION OF THE LOADING AREA AND DUMPSTER/COMPACTOR. | | | | | | 26. INTERNAL CONNECTION SHOULD BE PROVIDED BETWEEN THE | | | RESIDENTIAL LOBBY/LEASING AND THE PROPOSED CAF?/RETAIL. | | | ________________________________________ | | | | | | PLEASE NOTE THE FOLLOWING WHEN RESUBMITTING: | | | | | | A) WRITTEN RESPONSES TO COMMENTS MADE BY ALL | | | DEPARTMENTS SHALL BE PROVIDED UPON RESUBMISSION. | | | | | | B) 15 SETS OF REVISED PLANS AND/OR DOCUMENTS SHALL BE | | | PROVIDED, ALONG WITH ONE (1) REDUCED COPY (11IN X | | | 17IN), AND AN ELECTRONIC COPY OF ALL PLANS. | | | | | | C) PLEASE NOTE THAT RE-SUBMITTALS MAY BE SUBJECT TO | | | ADDITIONAL COMMENTS. | | | | | | D) IF NO RESPONSE IS RECEIVED WITHIN 60 DAYS OF THE | | | ISSUANCE OF THESE COMMENTS, THE APPLICATION WILL BE | | | CONSIDERED WITHDRAWN AND ANY FURTHER ACTION WILL | | | REQUIRE SUBMISSION OF A NEW DEVELOPMENT APPLICATION. | | | | | | E) PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20% OF THE ORIGINAL APPLICATION FEE. | | | | | | F) IN ORDER TO BE CONSIDERED FOR THE FEBRUARY 18, 2020, | | | PLANNING BOARD AGENDA, ALL COMMENTS SHALL BE | | | SATISFACTORILY ADDRESSED. PLEASE SUBMIT ALL REVISED | | | DOCUMENTS/PLANS NO LATER THAN DECEMBER 27, 2019. | | | | | | G) TO BE PLACED ON THE FEBRUARY 18, 2020, PLANNING | | | BOARD AGENDA, SIGNS SHALL BE POSTED ON THE PROPERTY NO | | | LATER THAN FEBRUARY 3, 2020. SIGNAGE SHALL CONFORM, AND | | | BE INSTALLED ACCORDING TO THE REQUIREMENTS OF THE | | | CITY?S ZONING AND LAND DEVELOPMENT REGULATIONS; SUCH | | | REQUIREMENTS ARE ALSO PROVIDED IN THE DEVELOPMENT | | | APPLICATION. A SIGNED AND NOTARIZED AFFIDAVIT SHALL BE | | | PROVIDED BY THE DEADLINE REFERENCED ABOVE. | | | | | | H) IF AFTER THE CASE HAS BEEN ADVERTISED THE APPLICANT | | | DESIRES TO REQUEST A CONTINUANCE, A FEE OF $50 PLUS THE | | | COST OF ADVERTISING WILL BE CHARGED. | | | ________________________________________ | | | | | | QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING: | | | | | | JOHN P. ROACH, AICP, PRINCIPAL PLANNER | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION | | | 401 CLEMATIS STREET - P.O. BOX 3147 | | | WEST PALM BEACH, FLORIDA 33402 | | | | | | P: 561.822.1448 | | | TTY: 800.955.8771 | | | E: [email protected] | | | | | | W: WPB.ORG | | | |
|
|
| |
Print |
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |