Plan Review Details - Project Z19100014
| Plan Review Stops For Project Z19100014 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
11-12-2019 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
11-12-2019 |
Time |
20:05 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
11-12-2019 |
Time |
20:05 |
Sent To |
|
|
| Notes |
| 2019-11-12 20:13:00 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. LOCATION OF ACCESSIBLE PARKING SPACES. FLOOR PLANS | | | A1.02 THROUGH A1.05 SHOW REGULAR PARKING SPACES THAT | | | ARE CLOSER TO THE ELEVAVATOR LOBBY THAN THE THE | | | ACCESSIBLE PARKING SPACES ARE. PER SECTION 208.3 OF | | | FLORIDA ACCESSIBILITY CODE, ACCESSIBLE PARKING SPACES | | | ARE TO BE LOCATED ON THE SHORTEST POSSIBLE ROUTE OF | | | TRAVEL FROM ADJACENT PARKING TO AN ACCESSIBLE ENTRANCE. | | | THE DESIGN OF ACCESSIBLE PARKING SPACES SHALL COMPLY | | | WITH SECTION 502 OF FLORIDA ACCESSIBILITY CODE. | | | | | | 3. VAN ACCESSIBLE PARKING SPACES. NONE OF THE | | | ACCESSIBLE PAKING SPACES ARE DESIGNATED AS VAN | | | ACCESSIBLE PARKINGS. 2 SUCH SPACES ARE REQUIRED. PER | | | SECTION 208.2.4 OF FLORIDA ACCESSIBILITY CODE, ONE IN | | | EVERY SIX REQUIRED ACCESSIBLE SPACES (AT LEAST ONE) IN | | | A PARKING STRUCTURE, SHALL BE ?VAN ACCESSIBLE? AND | | | DESIGNED IN ACCORDANCE WITH SECTION OF 502 OF FLORIDA | | | ACCESSIBILITY CODE (VERTICAL CLEARANCE NOT LESS THAN 98 | | | INCHES AT SPACE AND VEHICULAR ACCESS ROUTE) | | | | | | 4. ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE DOES | | | NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL OPENINGS TO | | | MEET THE DEFINITION OF AN OPEN PARKING GARAGE, IT WILL | | | BE CONSIDERED AN ENCLOSED PARKING GARAGE AND MUST HAVE | | | EXHAUST SYSTEMS. THE EXHAUST SYSTEMS SHALL BE DESIGNED | | | TO MINIMIZE NOISE LEVELS USING INLINE FAN SILENCERS OR | | | OTHER APPROVED METHODS. | | | | | | 5. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 6. 8TH FLOOR POOL AND POOL DECK EGRESS WIDTHS FOR DOORS | | | AND STAIRS. BASED ON THE CUMULATIVE NUMBER OF OCCUPANTS | | | ON THE POOL DECK AND IN THE POOL AND 8TH FLOOR ROOMS, | | | CHECK THAT THE EGRESS DOORS AND STAIRS ARE SUFFICIENTLY | | | WIDE. | | | | | | 7. GREASE INTERCEPTOR. A GREASE INTERCEPTOR WILL BE | | | REQUIRED. PLEASE CONTACT JEFFREY ODOMS, UTILITIES O&M | | | SUPERINTENDENT, PUBLIC UTILITIES DEPARTMENT, FATS OILS | | | AND GREASE DIVISION, AT (561) 822-2172, OR BY EMAIL: | | | [email protected] | | | | | | 8. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS, | | | GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND | | | OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS, | | | SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC. | | | | | | 9. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND | | | CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF | | | CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL | | | NEIGHBORING PROPERTIES. | | | | | | 10. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER | | | AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY, | | | INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE | | | CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF | | | NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION | | | THAT MAY AFFECT THE USE OF THEIR PROPERTY. | | | | | | 11. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT | | | WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL | | | HAVE A SEPARATE ADDRESS. FOR STREET ADDRESSING, CONTACT | | | MICHAEL ORIO, GIS SUPPORT SPECIALIST, AT (561) 494 | | | 1080, OR BY EMAIL: [email protected] | | | | | | 12. ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT | | | TO ART IN PUBLIC PLACES (AIPP) ASSESSMENT. FOR ADVICE | | | ON THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP | | | ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC | | | PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL: | | | [email protected] | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
4 |
Status |
P |
Date |
06-22-2021 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
06-22-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
06-22-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-06-22 07:34:37 | PASSED WITH PROVISO: SCALE AND MEASUREMENT ICON MISSING | | | FROM UTILITY PLAN. PLEASE ADD. |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
3 |
Status |
F |
Date |
03-04-2021 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
03-04-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
03-04-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-03-04 08:39:54 | COMMENTS FROM RICK ROSSANO, PROJECT COORD, ENG SERVICES | | | ? 561-494-1098, [email protected] | | | | | | PLEASE RECHECK AS-BUILTS AND CONFIRM CORRECT SIZE AND | | | MATERIAL OF EXISTING SANITARY LINE IN ALLEY WHERE | | | SANITARY TAP IS PROPOSED. | | | | | | PLEASE UPDATE ALL CITY OF WPB STANDARD DETAILS TO MOST | | | CURRENT VERSIONS. CONTACT [email protected] FOR ASBUILTS | | | AND CURRENT CAD FILES OF CITY OF WPB STANDARD DETAILS & | | | NOTES. | | | | | | PLEASE PROVIDE ELEVATION CONVERSION NOTE ON ALL UTILITY | | | AND PAVING SHEETS. | | | | | | PLEASE INCLUDE FIRE AND IRRIGATION IF ANY IN WATER | | | DEMAND TABLE ON UTILITY SHEET. | | | | | | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD | | | CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES, | | | PLEASE CONTACT 561-494-2262 OR [email protected]: | | | | | | -PLEASE VERIFY DOMESTIC METER AND BACKFLOW ASSEMBLY ARE | | | OUTSIDE OF BUILDING. | | | | | | -UTILITY PLAN SAYS IRRIGATION METER IS 0.5INCH. WPB | | | UTILITIES DOES NOT OFFER A 0.5INCH IRRIGATION METER. | | | | | | -FOR FORMAL ENGINEERING SUBMITTAL: LABEL IRRIGATION | | | WATER SERVICE PIPE SIZE AND MATERIAL TYPE, UPDATE WATER | | | SERVICE STANDARD DETAILS TO NEWEST REVISION, SHOW WATER | | | SERVICE TAPS FOR NORTH SIDE OF GARDENIA ON UTILITY | | | PLAN. | | | | | | -PROPERTY OWNER WILL BE REQUIRED TO SUBMIT AND RECORD A | | | BACKFLOW COVENANT. | | | | | | -CANNOT FIND REMOVAL OF THE EXISTING WATER SERVICES AND | | | METER BOXES ON GARDENIA AND DIXIE ON DEMO OR UTILITY | | | PLANS. PLEASE ADD. | | | | | | -THE SIZE OF THE DOMESTIC AND IRRIGATION METER COMBINED | | | IS LARGER THAN THE TAP. PLEASE VERIFY BUILDING WILL | | | HAVE SUFFICIENT WATER IF IRRIGATION IS RUNNING. | | | | | | -THERE IS AN EXISTING TRAFFIC SIGNAL BOX AT THE EAST | | | SIDE OF THE ALLEY THAT LOOKS TO BE CONFLICTING WITH THE | | | CURB AND SIDEWALK. PLEASE RESOLVE. | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
F |
Date |
05-07-2020 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
05-07-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
05-07-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-05-07 10:51:33 | COMMENTS FROM RICK ROSSANO, PROJECT COORD, ENG SERVICES | | | ? 561-494-1098, [email protected] | | | | | | PLEASE RECHECK AS-BUILTS AND SHOW CORRECT SIZE AND | | | MATERIAL OF EXISTING SANITARY LINE IN ALLEY WHERE | | | SANITARY TAP IS PROPOSED. | | | | | | PLEASE UPDATE ALL CITY OF WPB STANDARD DETAILS TO MOST | | | CURRENT VERSIONS. | | | | | | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD | | | CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES, | | | PLEASE CONTACT 561-494-2262 OR [email protected]: | | | | | | -FOR THE DEMAND CALCULATIONS TABLE, A FEW ITEMS SEEMED | | | ODD: | | | ~IT LISTS SUPPORT RESTAURAN?, BUT IT DID NOT GIVE ANY | | | GPD FOR IT. | | | ~IT LISTS 1 PENTHOUSE, BUT THEN LISTS 2 PENTHOUSES FOR | | | SEWER. | | | ~DID NOT LIST IRRIGATION OR FIRE. | | | | | | -ON GARDENIA ARE THE LIMITS OF THE PAVEMENT RESTORATION | | | COMPLIANT WITH CITY DETAIL? | | | | | | -FOR THE 6 IN. FIRELINE, RECOMMEND ELIMINATING THE 6 | | | IN. GATE VALVE IN THE SIDEWALK AND JUST MAKE THE 6 IN. | | | GATE VALVE IN THE STREET THE POINT OF SERVICE. | | | | | | -PLANTER TO EAST SIDE OF 6 IN. FIRELINE SERVICE LOOKS | | | CLOSE? PLEASE ADD ROOT BARRIER. | | | | | | -HARD TO SEE FIRE HYDRANT ON GARDENIA AND LOOKS TO BE | | | IN CONFLICT WITH SOME KIND OF STORM-WATER UTILITY. | | | PLEASE ALSO DO NOT LOCATE VALVE OR HYDRANT IN CONCRETE | | | DRIVEWAY APPROACH. | | | | | | -FOR WATER SERVICE NEAR NW CORNER OF PROPERTY RECOMMEND | | | ELIMINATING REDUNDANT GATE VALVE IN SIDEWALK. | | | | | | -FOR 10 FT. WATER EASEMENT PLEASE RELABEL AS UTILITY | | | EASEMENT AND PROVIDE BOTH DIMENSIONS. | | | | | | -NEED SEPARATE ENLARGED/ZOOMED PLAN FOR THE WATER | | | SERVICE SETUP INSIDE THE UTILITY EASEMENT -> CANNOT SEE | | | HOW THE WATER SERVICES ARE BEING CONSTRUCTED. | | | | | | -HARD TO TELL WHICH PARTS OF ALLEY PAVEMENT RESTORATION | | | IS TAKING PLACE. IS THE WHOLE ALLEYWAY BEING MILLED AND | | | RESURFACED TO THE E & W PROPERTY LIMITS? | | | | | | -DO NOT SEE DATUM INFORMATION OR PROPERTY ADDRESS | | | LISTED. | | | | | | THANKS, | | | | | | MARK HURLEY | | | FIELD CUSTOMER SERVICE SUPERVISOR | | | CITY OF WEST PALM BEACH PUBLIC UTILITIES | | | 561-822-2262 | | | | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
11-12-2019 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
11-12-2019 |
Time |
|
Rev Time |
4.00 |
| Received By |
rrossano |
Date |
11-12-2019 |
Time |
|
Sent To |
|
|
| Notes |
| 2019-11-12 15:17:12 | 1. PLEASE RESPOND IN WRITING TO ALL COMMENTS WITH Z | | | PERMIT NUMBER, PROJECT NAME AND ADDRESS. | | | 2. PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY | | | OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC | | | RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF | | | YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE | | | MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL | | | IN THE WPB ENGINEERING SERVICES DEPARTMENT AT | | | [email protected] OR 561-494-1040 FOR FURTHER | | | ASSISTANCE. | | | 3. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS | | | OF ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES, | | | INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND | | | SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES, | | | METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE | | | SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING | | | GRADES, PIPES SIZES, MATERIALS, ELEVATIONS, | | | ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL | | | INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER | | | LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE | | | PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN | | | VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. | | | PLEASE SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT | | | MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL | | | EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT, | | | INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION & | | | TELECOMMUNICATION FACILITIES LOCATED ON THE | | | RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL | | | UTILITY CROSSINGS. | | | 4. CUT AND CAP UTILITIES NOT IN USE, AND REMOVE ANY | | | ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY | | | RIGHT OF WAY. | | | 5. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE | | | DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB | | | DEVELOPMENT APPLICATION). | | | 6. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND | | | PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM | | | AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE | | | PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER. | | | 7. SHOW VERTICAL DATUM AND DATUM CONVERSION INFORMATION | | | (NAVD 88 AND NGVD 29). | | | 8. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND | | | IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED | | | AREAS. | | | 9. PLEASE RELOCATE ONSITE CLEANOUTS CLOSER TO PROPERTY | | | LINE FOR PROPOSED SANITARY LATERALS. | | | 10. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE | | | SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING | | | PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT | | | HIM AT 561-494-2262 OR [email protected] | | | 11. PROVIDE DEDICATED UTILITY EASEMENTS TO ALLOW ACCESS | | | FOR CITY PERSONNEL TO PROPOSED UTILITY WATER METERS. | | | 12. PLEASE CHECK TO SEE IF FDEP FORMS ARE NEEDED. | | | 13. PLEASE CLEARLY LABEL CITY OF WPB POINTS OF SERVICE | | | FOR UTILITY CONNECTIONS. | | | 14. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER | | | METER AND BACKFLOW PREVENTION. INCLUDE EASEMENT | | | DEDICATION FOR WATER METER. | | | 15. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE CALLOUT | | | DOMESTIC BACKFLOW PREVENTER AS RPPA AND FIRE BACKFLOW | | | PREVENTER AS DCDA. SPECIFY LEAD FREE DESIGN ON ALL | | | BACKFLOWS. | | | 16. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES | | | OF WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS. | | | 17. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING | | | APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT | | | SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING | | | SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED | | | LEAD-FREE DESIGN. | | | | | | SHEET C-09: | | | 1. ADD PAVEMENT RESTORATION NOTE PER CITY OF WPB | | | STANDARD DETAIL GC-9; CALLOUT LIMITS OF PAVEMENT | | | RESTORATION. | | | 2. EXISTING SANITARY LINE IN ALLEY IS 8 IN. C-900, NOT | | | 12 IN. VCP. REVISE PLANS AND REVIEW CONNECTIONS. | | | 3. EXISTING WATER SERVICE ON GARDENIA ST. IS 8 IN. DIP, | | | NOT CONCRETE PIPE. REVISE PLANS AND REVIEW CONNECTIONS. | | | | | | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, CITY OF | | | WPB PUBLIC UTILITIES FIELD CUSTOMER SERVICE SUPERVISOR: | | | | | | 1. FIRE HYDRANT IS SHOWN IN MIDDLE OF SIDEWALK -> | | | RECOMMEND MAKING IT SAFER EITHER BY RELOCATING IT IN | | | BETWEEN PLANTERS OR WITHIN A GRASS AREA. SHOULD ALSO | | | CHECK TO SEE IF THE FIRE HYDRANT IS REQUIRED. THERE ARE | | | EXISTING HYDRANTS AT THE EAST INTERSECTION AND ANOTHER | | | ONE AT THE WEST. | | | 2. DOMESTIC AND IRRIGATION METER APPEAR TO BE INSIDE | | | THE BUILDING. THOSE NEED TO BE OUTSIDE IN A LOW/NON | | | TRAFFIC AREA. RECOMMEND RELOCATING WATER SERVICES, OR | | | CHANGING BUILDING/PROPERTY DESIGN/FOOTPRINT TO ALLOW A | | | GRASS AREA WHERE THE METERS CAN BE LOCATED. THAT AREA | | | SHOULD HAVE SMALL UTILITY EASEMENT CREATED AROUND IT IF | | | PROTRUDING INTO PROPERTY LINES. IF DOMESTIC METER IS 3 | | | IN. OR GREATER, SHOULD BE AN ABOVE-GROUND INSTALLATION. | | | 3. DOMESTIC AND IRRIGATION BACKFLOW ASSEMBLIES APPEAR | | | TO BE INSIDE THE BUILDING. THOSE SHOULD BE LOCATED | | | OUTSIDE OF BUILDINGS ON PRIVATE PROPERTY AND NOT IN ANY | | | ROW OR UE. THEY SHOULD NOT BE LOCATED IN MIDDLE OF | | | SIDEWALK EITHER. BACKFLOW ASSEMBLIES WOULD NEED BE RP | | | TYPE. | | | 4. THERE ARE EXISTING UTILITY BOXES AROUND NORTH AND | | | EAST SIDES OF PROPERTY IN THE SIDEWALK. PLAN SHOULD | | | CALL THOSE OUT ALONG WITH WHAT WILL BE HAPPENING TO | | | THEM (LEAVE AS IS, CUT BACK TO MAIN AND CAPPED, ETC?) | | | 5. FIRELINE BACKFLOW ASSEMBLY WITH DETECTOR METER | | | APPEARS TO BE INSIDE BUILDING. NEEDS TO BE LOCATED | | | OUTSIDE ON PRIVATE PROPERTY (AND NOT IN ANY ROW, UE, OR | | | MIDDLE OF SIDEWALK), UNLESS CITY OF WPB FIRE DEPARTMENT | | | REQUIRES IT INSIDE THE BUILDING. | | | 6. FDC APPEARS TO BE IN CONFLICT WITH A DOOR. | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | | | | RICK ROSSANO, PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | DIRECT: (561) 494-1098 | | | [email protected] | | | | | | | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
4 |
Status |
P |
Date |
06-22-2021 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
06-22-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
06-22-2021 |
Time |
11:46 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
03-05-2021 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
03-05-2021 |
Time |
13:16 |
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
03-05-2021 |
Time |
13:13 |
Sent To |
|
|
| Notes |
| 2021-03-05 13:16:05 | FIRE HAS REVIEWED THE RESUBMITTAL PACKET FOR THE | | | MARRIOTT AC PROJECT AT 414 GARDENIA ST AND HAS NO | | | OBJECTIONS AND APPROVES. | | | | | | FIRE'S APPROVAL OF THIS SUBMITTED PROJECT DOES NOT | | | CONSTITUTE ITS FINAL REVIEW OR APPROVAL | | | | | | FIRE SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT THE | | | APPROPRIATE TIME AND IN ACCORDANCE WITH THE | | | REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
04-27-2020 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
04-27-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
04-27-2020 |
Time |
12:49 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
11-06-2019 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
11-06-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
11-06-2019 |
Time |
15:18 |
Sent To |
|
|
| Notes |
| 2019-11-06 15:26:49 | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, | | | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM | | | BEACH FIRE RESCUE. | | | | | | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE | | | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. | | | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS | | | ARE SUBMITTED FOR PERMIT. | | | | | | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE | | | PROPOSED PROJECT. | | | | | | 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY | | | WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE | | | PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A | | | PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED | | | TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN | | | STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY | | | MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER | | | PROTECTION. | | | | | | 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY | | | IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING | | | ALL CONSTRUCTION ACTIVITIES. | | | | | | 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM | | | ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION. | | | ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND | | | AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT | | | WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS. | | | | | | 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE | | | REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE | | | ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS. | | | | | | 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH | | | THE 6TH EDITION OF THE FLORIDA FIRE PREVENTION CODE, | | | INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES. | | | | | | 6. ALL PARKING STRUCTURES SHALL COMPLY WITH NFPA 88A, | | | PARKING STRUCTURES AND NFPA 101, THE LIFE SAFETY CODE, | | | INCLUDING MORE SPECIFICALLY, CHAPTER 42 STORAGE | | | OCCUPANCIES (PARKING STRUCTURES) | | | | | | 7. A NFPA 13 COMPLAINT FIRE SPRINKLER SYSTEM AND NFPA | | | 14 COMPLIANT WET STANDPIPE SYSTEM ARE REQUIRED FOR THIS | | | STRUCTURE. TEMPORARY STANDPIPES ARE REQUIRED WHEN THE | | | BUILDING REACHES THREE LEVELS OR THIRTY FEET WHILE | | | BEING CONSTRUCTED. SEPARATE SHOP DRAWINGS, ARE REQUIRED | | | TO BE SUBMITTED, REVIEWED AND APPROVED BY THE FIRE | | | PREVENTION BUREAU PRIOR TO ANY INSTALLATION. | | | | | | IT IS RECOMMENDED FOR HIGH RISES HAVE TWO SEPARATE FDC | | | LOCATIONS REMOTELY LOCATED. | | | | | | PER NFPA 14 | | | | | | 6.4.5.4* FIRE DEPARTMENT CONNECTIONS SHALL BE LOCATED | | | NOT MORE THAN 100 FT (30.5 M) FROM THE NEAREST FIRE | | | HYDRANT CONNECTED TO AN APPROVED WATER SUPPLY. | | | | | | PER NFPA 1 | | | | | | 18.3 WATER SUPPLIES. | | | | | | 18.3.1* AN APPROVED WATER SUPPLY CAPABLE OF SUPPLYING | | | THE REQUIRED FIRE FLOW FOR FIRE PROTECTION SHALL BE | | | PROVIDED TO ALL PREMISES UPON WHICH FACILITIES, | | | BUILDINGS, OR PORTIONS OF BUILDINGS ARE HEREAFTER | | | CONSTRUCTED OR MOVED INTO THE JURISDICTION. THE | | | APPROVED WATER SUPPLY SHALL BE IN ACCORDANCE WITH | | | SECTION 18.4. | | | | | | PER FLORIDA ADMINISTRATIVE CODE SECTION 61G15-32.004, | | | FIRE PROTECTION ENGINEERING DOCUMENTS SHALL INCLUDE THE | | | POINT OF SERVICE FOR THE WATER SUPPLY, A LIST OF | | | APPLICABLE NFPA STANDARDS APPLICABLE TO THE PROJECT, | | | CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR | | | AREA, SUPPRESSION SYSTEM TYPE, DESIGN DENSITIES, WATER | | | SUPPLY DATA (FIRE PUMP DATA, HYDRANT FLOW TEST DATA) | | | AND ANY PERFORMANCE BASED INFORMATION SUCH AS | | | PRE-ENGINEERED SYSTEMS. | | | FOR THE PROPOSED FIRE PUMP(S) , WHAT IS(ARE) THE | | | PRIMARY AND SECONDARY POWER SOURCES? | | | | | | | | | 7A. THE LOCATION OF THE FIRE LINE DDCV SHALL BE LOCATED | | | PER NFPA 24 AND AT LEAST 40' FROM THE BUILDING OR AS | | | PER THE EXCEPTIONS PROVIDED FOR PROTECTION. CLOSE | | | COORDINATION OF THE FINAL LOCATION IS REQUIRED WITH THE | | | OFFICE OF THE FIRE MARSHAL, THE CITY LANDSCAPE PLANNER, | | | THE CITY ENGINEERING DEPARTMENT, AND THE CITY'S URBAN | | | DESIGNER. | | | | | | 8. A CLASS ?A? NFPA 72 COMPLIANT MONITORED FIRE ALARM | | | SYSTEM IS REQUIRED FOR THIS STRUCTURE. SEPARATE SHOP | | | DRAWINGS, ARE REQUIRED TO BE SUBMITTED, REVIEWED AND | | | APPROVED BY THE FIRE PREVENTION BUREAU PRIOR TO ANY | | | INSTALLATION. | | | | | | 9. ALL ELEVATORS SHALL BE EQUIPPED WITH A REGION 7 | | | KEYWAY SYSTEM. | | | | | | ALL NEW ELEVATORS SHALL CONFORM TO THE FIRE FIGHTER?S | | | EMERGENCY OPERATIONS REQUIREMENTS OF ASME A17.1/CSA | | | B44, SAFETY CODE FOR ELEVATORS. | | | | | | ANY BUILDING THAT IS MORE THAN THREE STORIES HIGH OR IN | | | WHICH THE VERTICAL DISTANCE BETWEEN THE BOTTOM TERMINAL | | | LANDING AND THE TOP TERMINAL LANDING EXCEEDS 25 FEET | | | MUST BE CONSTRUCTED TO CONTAIN AT LEAST ONE PASSENGER | | | ELEVATOR THAT IS OPERATIONAL AND WILL ACCOMMODATE AN | | | AMBULANCE STRETCHER 76 INCHES LONG AND 24 INCHES WIDE | | | IN THE HORIZONTAL POSITION. | | | | | | 10. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL | | | BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL | | | DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS, | | | EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A | | | PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE | | | SAFETY FEATURES AND EQUIPMENT. | | | | | | 11. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED | | | ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF | | | FIRE PREVENTION. | | | | | | ALL NEW FIRE HYDRANTS AND FDC?S PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLOSELY COORDINATED WITH THE | | | BUREAU OF FIRE PREVENTION. PROPOSED FIRE HYDRANTS AND | | | FDC?S SHOULD BE LOCATED ON THE SAME SIDE OF THE STREET | | | OR ACCESS ROADWAY TO ALLOW FREE ACCESS FOR OTHER | | | ARRIVING EMERGENCY VEHICLES. | | | | | | 12. COMMAND ROOM | | | THE FIRE COMMAND CENTER SHALL COMPLY WITH NFPA 1, | | | CHAPTER 11, BUILDING SERVICES; 11.9 AND SHALL CONTAIN | | | THE FOLLOWING FEATURES: | | | A. SHALL BE A MINIMUM OF 200 FT SQUARED WITH A MINIMUM | | | DIMENSION OF 10 FT. | | | B. THE FIRE DEPARTMENT COMMUNICATIONS SYSTEM. | | | C. A TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED | | | ACCESS TO THE PUBLIC TELEPHONE SYSTEM | | | D. SCHEMATIC BUILDING PLANS INDICATING THE TYPICAL | | | FLOOR PLAN AND DETAILING THE BUILDING CORE, MEANS OF | | | EGRESS, FIRE PROTECTION SYSTEMS, FIRE-FIGHTING | | | EQUIPMENT AND FIRE DEPARTMENT ACCESS AND THE LOCATION | | | OF FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE | | | BARRIERS AND SMOKE PARTITIONS | | | E. A WORK TABLE. | | | F. IF APPLICABLE, A HAZARDOUS MATERIAL MANAGEMENT PLAN | | | FOR THE BUILDING. | | | G. THE EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM | | | CONTROL UNIT. | | | H. ANNUNCIATOR UNIT VISUALLY INDICATING THE LOCATION OF | | | THE ELEVATORS AND WHETHER THEY ARE OPERATIONAL | | | I. STATUS INDICATORS AND CONTROLS FOR AIR DISTRIBUTION | | | SYSTEMS. | | | J. CONTROLS FOR UNLOCKING STAIRWAY DOORS SIMULTANEOUSLY | | | K. SPRINKLER VALVE AND WATER FLOW DETECTOR DISPLAY | | | PANELS | | | L. EMERGENCY AND STANDBY POWER STATUS INDICATORS | | | M. FIRE PUMP STATUS INDICATORS | | | N. GENERATOR SUPERVISION DEVICES AND MANUAL START AND | | | TRANSFER FEATURES. | | | O. PUBLIC ADDRESS SYSTEM, WHERE SPECIFICALLY REQUIRED | | | BY OTHER SECTIONS OF THIS CODE | | | P. CONTROLS REQUIRED FOR SMOKE CONTROL | | | Q. ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME | | | A17.1. | | | R. ELEVATOR EMERGENCY OR STANDBY POWER SELECTOR | | | SWITCH(ES), WHERE EMERGENCY OR STANDBY POWER IS | | | PROVIDED | | | 11.8.6* EMERGENCY COMMAND CENTER. | | | 11.8.6.1 AN EMERGENCY COMMAND CENTER SHALL BE PROVIDED | | | IN A | | | LOCATION APPROVED BY THE FIRE DEPARTMENT. | | | 11.8.6.2 THE EMERGENCY COMMAND CENTER SHALL CONTAIN THE | | | FOLLOWING: | | | (1) VOICE FIRE ALARM SYSTEM PANELS AND CONTROLS | | | (2) FIRE DEPARTMENT TWO-WAY TELEPHONE COMMUNICATION | | | SERVICE | | | PANELS AND CONTROLS WHERE REQUIRED BY ANOTHER SECTION | | | OF THIS | | | CODE | | | (3) FIRE DETECTION AND FIRE ALARM SYSTEM ANNUNCIATION | | | PANELS | | | (4) ELEVATOR FLOOR LOCATION AND OPERATION ANNUNCIATORS | | | (5) ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME | | | A17.1/CSA B44, SAFETY CODE FOR ELEVATORS AND ESCALATORS | | | (6) ELEVATOR EMERGENCY POWER SELECTOR SWITCH(ES) WHERE | | | PROVIDED | | | IN ACCORDANCE WITH ASME A17.1/CSA B44 | | | (7) SPRINKLER VALVE AND WATERFLOW ANNUNCIATORS | | | (8) EMERGENCY GENERATOR STATUS INDICATORS | | | (9) CONTROLS FOR ANY AUTOMATIC STAIRWAY DOOR UNLOCKING | | | SYSTEM | | | (10) FIRE PUMP STATUS INDICATORS | | | (11) TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED | | | ACCESS TO THE | | | PUBLIC TELEPHONE SYSTEM | | | (12) STAIRWAY VIDEO MONITORING EQUIPMENT AS REQUIRED BY | | | 11.8.8 | | | | | | 13. RADIO | | | NFPA 1, CHAPTER 11, BUILDING SERVICES; 11.10 TWO-WAY | | | RADIO ENHANCEMENT SERVICES. | | | 11.10.1 IN ALL NEW AND EXISTING BUILDINGS, MINIMUM | | | RADIO SIGNAL STRENGTH FOR FIRE DEPARTMENT | | | COMMUNICATIONS SHALL BE MAINTAINED AT A LEVEL | | | DETERMINED BY THE AHJ. | | | NFPA 72, 24.5.2* TWO-WAY RADIO COMMUNICATIONS | | | ENHANCEMENT SYSTEMS. | | | 24.5.2.2 RADIO COVERAGE. RADIO COVERAGE SHALL BE | | | PROVIDED THROUGHOUT THE BUILDING AS A PERCENTAGE OF | | | FLOOR AREA AS SPECIFIED IN 24.5.2.2.1 THROUGH | | | 24.5.2.2.3. | | | 24.5.2.2.1 CRITICAL AREAS. CRITICAL AREAS, SUCH AS THE | | | EMERGENCY COMMAND CENTER(S), THE FIRE PUMP ROOM(S), | | | EXIT STAIRS, EXIT PASSAGEWAYS, ELEVATOR LOBBIES, | | | STANDPIPE CABINETS, SPRINKLER SECTIONAL VALVE | | | LOCATIONS, AND OTHER AREAS DEEMED CRITICAL BY THE | | | AUTHORITY HAVING JURISDICTION, SHALL BE PROVIDED WITH | | | 99 PERCENT FLOOR AREA RADIO COVERAGE. | | | 24.5.2.2.2 GENERAL BUILDING AREAS. GENERAL BUILDING | | | AREAS SHALL BE PROVIDED WITH 90 PERCENT FLOOR AREA | | | RADIO COVERAGE. | | | 24.5.2.3 SIGNAL STRENGTH. | | | 24.5.2.3.1 INBOUND. A MINIMUM INBOUND SIGNAL STRENGTH | | | OF -95 DBM, OR OTHER SIGNAL STRENGTH AS REQUIRED BY THE | | | AUTHORITY HAVING JURISDICTION, SHALL BE PROVIDED | | | THROUGHOUT THE COVERAGE AREA. | | | 24.5.2.3.2 OUTBOUND. A MINIMUM OUTBOUND SIGNAL STRENGTH | | | OF -95 DBM AT THE DONOR SITE, OR OTHER SIGNAL STRENGTH | | | AS REQUIRED BY THE AUTHORITY HAVING JURISDICTION, SHALL | | | BE PROVIDED FROM THE COVERAGE AREA. | | | | | | THE SYSTEM SHALL MAINTAIN A MINIMUM RADIO SIGNAL | | | STRENGTH OF -95 DBM FOR THE RADIO SYSTEM USED BY WEST | | | PALM BEACH FIRE RESCUE. TESTING SHALL BE BY AN | | | ACCEPTABLE NATIONAL STANDARD DOCUMENTING PERCENTAGES | | | NOTED ABOVE AND BY ACTUAL RADIO TESTING BY FIRE | | | PERSONNEL. IF THE MINIMUM CANNOT BE MAINTAINED, A | | | BI-DIRECTIONAL AMPLIFIED SYSTEM SHALL BE INSTALLED WITH | | | A MINIMUM 2-HOUR RUN TIME BATTERY BACK-UP. | | | | | | 14. KNOX-BOX KEY SYSTEM SHALL BE REQUIRED FOR THIS | | | BUILDING. | | | ANY GATES SHALL BE PROVIDED WITH KNOX KEY ACCESS LOCKS, | | | PADLOCKS AND/OR SWITCHES FOR 24 HOUR EMERGENCY ACCESS. | | | | | | 15. THE SMOKE CONTROL SYSTEM SHALL COMPLY WITH NFPA | | | 101, CHAPTER 9, BUILDING SERVICE AND FIRE PROTECTION | | | EQUIPMENT, INCLUDING: | | | | | | THE SMOKE CONTROL SYSTEMS SHALL BE INSTALLED, | | | INSPECTED, TESTED, AND MAINTAINED IN ACCORDANCE WITH | | | NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS; NFPA 204, | | | STANDARD FOR SMOKE AND HEAT VENTING; OR NATIONALLY | | | RECOGNIZED STANDARDS, ENGINEERING GUIDES, OR | | | RECOMMENDED PRACTICES, AS APPROVED BY THE AUTHORITY | | | HAVING JURISDICTION. | | | | | | THE ENGINEER OF RECORD SHALL CLEARLY IDENTIFY THE | | | INTENT OF THE SYSTEM, THE DESIGN METHOD USED, THE | | | APPROPRIATENESS OF THE METHOD USED, AND THE REQUIRED | | | MEANS OF INSPECTING, TESTING, AND MAINTAINING THE | | | SYSTEM. | | | | | | ACCEPTANCE TESTING SHALL BE PERFORMED BY A SPECIAL | | | INSPECTOR IN ACCORDANCE WITH SECTION 9.9. | | | | | | 16. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT | | | DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | 17. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING | | | PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH | | | THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
4 |
Status |
P |
Date |
07-06-2021 |
|
|
Cont ID |
|
| Sent By |
aburnett |
Date |
07-06-2021 |
Time |
09:22 |
Rev Time |
0.00 |
| Received By |
aburnett |
Date |
07-06-2021 |
Time |
09:21 |
Sent To |
|
|
| Notes |
| 2021-07-06 09:27:27 | REVIEWED BY: ANDREW BURNETT | | | 501 S. DIXIE HOTEL #Z19100014 | | | 7/6/21 | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. AS STATED IN | | | ITEM #5 ARBORIST SHALL PROVIDE A REPORT ON THE LOCATION | | | POSIBILITIES FOR OAK TREES. | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | STREET TREES AND RIGHT OF WAY LANDSCAPING AND | | | IRRIGATION APPROVED WITH THIS PETITION. | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A | | | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
3 |
Status |
F |
Date |
03-22-2021 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
03-22-2021 |
Time |
12:13 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
03-22-2021 |
Time |
12:13 |
Sent To |
|
|
| Notes |
| 2021-03-22 12:14:39 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: 501 S DIXIE HOTEL Z19100014 | | | MARCH 22, 2021 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. SATISFIED. THE STREETSCAPE CAN BE IMPROVED TO | | | ACCOMPLISH THE INTENT OF THE CODE SECTION 94-113. THE | | | DATE PALMS MAY BE USED, BUT NOT AS COUNTING TOWARD THE | | | TREE REQUIREMENT AT THE MAXIMUM 30 FOOT SPACING. ADD | | | CANOPY TREES AS REQUIRED. | | | TREES ALONG GARDENIA MUST BE SPACED AT A MAXIMUM OF 30 | | | FEET TO PROVIDE CANOPY COVERAGE TO THE SIDEWALK. CAN BE | | | PLACED WITHIN SIGHT TRIANGLE AS THEY WILL HAVE 8 FOOT | | | CLEARANCE FROM THE GROUND TO FIRST BRANCHES. TREE | | | CANOPY MUST BE PROVIDED AT ENTRANCE/EXIT. | | | | | | 2. SATISFIED. CHANGE HIGHRISE OAK TO A CANOPY TREE TO | | | PROVIDE SHADE FOR THE PLAZA AREA. | | | | | | 3. SATISFIED. FLORIDA FRIENDLY LANDSCAPE DESIGN POINTS | | | CANNOT BE COUNTED FOR 51% OR MORE IN THE SAME CATEGORY. | | | REVISE. | | | COLUMN FOR POINTS DOES NOT LINE UP WITH CATEGORY. | | | REVISE. | | | | | | 4. PARTIALLY SATISFIED. SECTION 94-448 (D)(3) REQUIRES | | | NATIVE TREES IN GOOD CONDITION TO BE PRESERVED ON SITE | | | OR RELOCATED. SUBMIT THE REASON EXISTING LIVE OAK TREES | | | #38, 39 AND 40 CANNOT BE RELOCATED OR USED IN THE | | | PROPOSED LANDSCAPE. | | | PROVIDE EVALUATION IN WRITING FROM A TREE RELOCATION | | | CERTIFIED ARBORIST TO DOCUMENT REASONS THE TREES CANNOT | | | BE RELOCATED. | | | SUPPLY A RESPONSE ON THESE TREES. STAFF WILL WORK WITH | | | THE APPLICANT TO DETERMINE LOCATIONS FOR LIKELY | | | TRANSPLANTS. | | | TREES THAT ARE LIKELY TO BE REMOVED OR HAVE ALREADY | | | BEEN REMOVED NEED TO HAVE THE MITIGATION SHOWN. | | | LANDSCAPE ARCHITECT SHOULD CONTACT REVIEWER TO CLARIFY. | | | | | | 5. PARTIALLY SATISFIED. QGD-10 REQUIRES 25 PERCENT | | | PRIVATE OPEN SPACE FOR LOT SIZE UNDER 50,000 SQ FT. | | | PRIVATE OPEN SPACE AREAS MUST BE IDENTIFIED AND BROKEN | | | DOWN TO SHOW THE REQUIRED VEGETATED AREA AND ANY TREE | | | CANOPY REQUIREMENT FOR EACH AREA AS THE ALLOWED OPEN | | | SPACE TYPE. TREE CANOPY VALUES CAN BE FOUND IN SECTION | | | 94-109 TABLE IV-8. | | | TERRACE IS A PERMITTED PRIVATE OPEN SPACE TYPE PER | | | TABLE IV-6. | | | SEPARATE THE 5TH FLOOR PARKING STRUCTURE REQUIREMENTS | | | CALCULATIONS FROM THE REQUIRED OPEN SPACE CALCULATIONS, | | | AS THEY ARE SEPARATE CODE REQUIREMENTS. | | | PER SECTION 94-109, THE UPPER LEVEL PRIVATE OPEN SPACE | | | MEETS THE PURPOSE AND DEFINITION OF ROOFTOP GARDEN. | | | STAFF SUGGESTS ADDING THE MINIMAL AMOUNT OF TREE CANOPY | | | REQUIRED TO IMPROVE THE SPACE. | | | | | | 6. SATISFIED. SHOW LOCATIONS OF UTILITY LINES ON | | | LANDSCAPE PLAN, ALSO LOCATIONS OF FDC, VALVES AND | | | BACKFLOW PREVENTERS AND FPL TRANSFORMERS. INDICATE HOW | | | THE OVERHEAD LINES IN THE ADJACENT ALLEY WILL BE | | | ACCOMMODATED. | | | | | | 7. SATISFIED. SHOW LOCATIONS OF ANY ROOT BARRIERS | | | REQUIRED TO PROTECT UTILITY LINES. | | | | | | 8. SATISFIED. SHOW LOCATIONS OF REQUIRED STRUCTURAL | | | SOIL UNDER HARDSCAPE ADJACENT TO TREES. PROVIDE A | | | TYPICAL FOR THE INSTALLATION OF THE STRUCTURAL SOIL. | | | ADJUST THE TYPICAL DETAIL TO LOCAL CONDITIONS. REMOVE | | | THE DRAIN LINE AND ONLY SHOW 36 INCH DEPTH UNDER THE | | | ADJACENT HARDSCAPE, NOT UNDER THE TREE ROOT BALL. ANY | | | AREAS THAT ARE PLANTING AREAS NEED TO SHOW PLANTING | | | SOIL MIX. THE ROOT BALL FOR 20 FT TREES WILL BE AT | | | LEAST 36 INCHES IN DEPTH. | | | | | | 9. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L. | | | PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT | | | MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT | | | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE | | | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH | | | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH | | | FLORIDA LANDSCAPES. | | | ADDITIONAL COMMENTS 5/5/20: | | | 10. SATISFIED. REVISE THE EXISTING TREE DISPOSITION | | | LIST TO SHOW THE ACTUAL CANOPY DIAMETER FOR TREES #38, | | | 39, 40 AND 62 INSTEAD OF SHOWING >20 DIA. THEN SHOW | | | CALCULATED MITIGATION SQUARE FOOTAGE FOR THAT TREE. | | | ADDITIONAL COMMENTS 3/18/21: | | | 11. MEDJOOL DATE PALMS MUST HAVE AT LEAST 14 FOOT CLEAR | | | TRUNK SO THAT FRONDS ARE ABOVE 13.5 FEET CLEARANCE FOR | | | TRAFFIC LANE. | | | | | | 12. ROOT BARRIERS AT THE PROPOSED PLACEMENT WOULD BLOCK | | | TREE ROOT DEVELOPMENT IN THE PLANTING STRIPS. LINE | | | LOCATIONS WILL NEED TO BE WORKED OUT WITH UTILITIES TO | | | AVOID THIS. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | STREET TREES AND RIGHT OF WAY LANDSCAPING AND | | | IRRIGATION APPROVED WITH THIS PETITION. | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A | | | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
F |
Date |
05-05-2020 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
05-05-2020 |
Time |
16:00 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
05-05-2020 |
Time |
16:00 |
Sent To |
|
|
| Notes |
| 2020-05-05 16:00:52 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 | | | PROJECT: 501 S DIXIE HOTEL Z19100014 | | | MAY 5, 2020 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. PARTIALLY SATISFIED. THE STREETSCAPE CAN BE IMPROVED | | | TO ACCOMPLISH THE INTENT OF THE CODE SECTION 94-113. | | | THE DATE PALMS MAY BE USED, BUT NOT AS COUNTING TOWARD | | | THE TREE REQUIREMENT AT THE MAXIMUM 30 FOOT SPACING. | | | ADD CANOPY TREES AS REQUIRED. | | | TREES ALONG GARDENIA MUST BE SPACED AT A MAXIMUM OF 30 | | | FEET TO PROVIDE CANOPY COVERAGE TO THE SIDEWALK. CAN BE | | | PLACED WITHIN SIGHT TRIANGLE AS THEY WILL HAVE 8 FOOT | | | CLEARANCE FROM THE GROUND TO FIRST BRANCHES. TREE | | | CANOPY MUST BE PROVIDED AT ENTRANCE/EXIT. | | | | | | 2. SATISFIED. CHANGE HIGHRISE OAK TO A CANOPY TREE TO | | | PROVIDE SHADE FOR THE PLAZA AREA. | | | | | | 3. PARTIALLY SATISFIED. FLORIDA FRIENDLY LANDSCAPE | | | DESIGN POINTS CANNOT BE COUNTED FOR 51% OR MORE IN THE | | | SAME CATEGORY. REVISE. | | | COLUMN FOR POINTS DOES NOT LINE UP WITH CATEGORY. | | | REVISE. | | | | | | 4. PARTIALLY SATISFIED. SECTION 94-448 (D)(3) REQUIRES | | | NATIVE TREES IN GOOD CONDITION TO BE PRESERVED ON SITE | | | OR RELOCATED. SUBMIT THE REASON EXISTING LIVE OAK TREES | | | #38, 39 AND 40 CANNOT BE RELOCATED OR USED IN THE | | | PROPOSED LANDSCAPE. | | | PROVIDE EVALUATION IN WRITING FROM A TREE RELOCATION | | | CERTIFIED ARBORIST TO DOCUMENT REASONS THE TREES CANNOT | | | BE RELOCATED, EVEN OFF SITE. | | | | | | 5. PARTIALLY SATISFIED. QGD-10 REQUIRES 25 PERCENT | | | PRIVATE OPEN SPACE FOR LOT SIZE UNDER 50,000 SQ FT. | | | PRIVATE OPEN SPACE AREAS MUST BE IDENTIFIED AND BROKEN | | | DOWN TO SHOW THE REQUIRED VEGETATED AREA AND ANY TREE | | | CANOPY REQUIREMENT FOR EACH AREA AS THE ALLOWED OPEN | | | SPACE TYPE. TREE CANOPY VALUES CAN BE FOUND IN SECTION | | | 94-109 TABLE IV-8. | | | TERRACE IS A PERMITTED PRIVATE OPEN SPACE TYPE PER | | | TABLE IV-6. | | | SEPARATE THE 5TH FLOOR PARKING STRUCTURE REQUIREMENTS | | | CALCULATIONS FROM THE REQUIRED OPEN SPACE CALCULATIONS, | | | AS THEY ARE SEPARATE CODE REQUIREMENTS. | | | | | | 6. SATISFIED. SHOW LOCATIONS OF UTILITY LINES ON | | | LANDSCAPE PLAN, ALSO LOCATIONS OF FDC, VALVES AND | | | BACKFLOW PREVENTERS AND FPL TRANSFORMERS. INDICATE HOW | | | THE OVERHEAD LINES IN THE ADJACENT ALLEY WILL BE | | | ACCOMMODATED. | | | | | | 7. SATISFIED. SHOW LOCATIONS OF ANY ROOT BARRIERS | | | REQUIRED TO PROTECT UTILITY LINES. | | | | | | 8. PARTIALLY SATISFIED. SHOW LOCATIONS OF REQUIRED | | | STRUCTURAL SOIL UNDER HARDSCAPE ADJACENT TO TREES. | | | PROVIDE A TYPICAL FOR THE INSTALLATION OF THE | | | STRUCTURAL SOIL. | | | ADJUST THE TYPICAL DETAIL TO LOCAL CONDITIONS. REMOVE | | | THE DRAIN LINE AND ONLY SHOW 36 INCH DEPTH UNDER THE | | | ADJACENT HARDSCAPE, NOT UNDER THE TREE ROOT BALL. ANY | | | AREAS THAT ARE PLANTING AREAS NEED TO SHOW PLANTING | | | SOIL MIX. THE ROOT BALL FOR 20 FT TREES WILL BE AT | | | LEAST 36 INCHES IN DEPTH. | | | | | | 9. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L. | | | PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT | | | MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT | | | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE | | | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH | | | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH | | | FLORIDA LANDSCAPES. | | | ADDITIONAL COMMENTS 5/5/20: | | | 10. REVISE THE EXISTING TREE DISPOSITION LIST TO SHOW | | | THE ACTUAL CANOPY DIAMETER FOR TREES #38, 39, 40 AND 62 | | | INSTEAD OF SHOWING >20 DIA. THEN SHOW CALCULATED | | | MITIGATION SQUARE FOOTAGE FOR THAT TREE. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | STREET TREES AND RIGHT OF WAY LANDSCAPING AND | | | IRRIGATION APPROVED WITH THIS PETITION. | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A | | | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
11-12-2019 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
11-12-2019 |
Time |
10:40 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
11-12-2019 |
Time |
10:40 |
Sent To |
|
|
| Notes |
| 2019-11-12 10:41:20 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 | | | PROJECT: 501 S DIXIE HOTEL Z19100014 | | | NOVEMBER 8, 2019 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. THE STREETSCAPE CAN BE IMPROVED TO ACCOMPLISH THE | | | INTENT OF THE CODE SECTION 94-113. THE DATE PALMS MAY | | | BE USED, BUT NOT AS COUNTING TOWARD THE TREE | | | REQUIREMENT AT THE MAXIMUM 30 FOOT SPACING. ADD CANOPY | | | TREES AS REQUIRED. | | | | | | 2. CHANGE HIGHRISE OAK TO A CANOPY TREE TO PROVIDE | | | SHADE FOR THE PLAZA AREA. | | | | | | 3. FLORIDA FRIENDLY LANDSCAPE DESIGN POINTS CANNOT BE | | | COUNTED FOR 51% OR MORE IN THE SAME CATEGORY. REVISE. | | | | | | 4. SECTION 94-448 (D)(3) REQUIRES NATIVE TREES IN GOOD | | | CONDITION TO BE PRESERVED ON SITE OR RELOCATED. SUBMIT | | | THE REASON EXISTING LIVE OAK TREES #38, 39 AND 40 | | | CANNOT BE RELOCATED OR USED IN THE PROPOSED LANDSCAPE. | | | | | | 5. QGD-10 REQUIRES 25 PERCENT PRIVATE OPEN SPACE FOR | | | LOT SIZE UNDER 50,000 SQ FT. PRIVATE OPEN SPACE AREAS | | | MUST BE IDENTIFIED AND BROKEN DOWN TO SHOW THE REQUIRED | | | VEGETATED AREA AND ANY TREE CANOPY REQUIREMENT FOR EACH | | | AREA AS THE ALLOWED OPEN SPACE TYPE. TREE CANOPY VALUES | | | CAN BE FOUND IN SECTION 94-109 TABLE IV-8. | | | | | | 6. SHOW LOCATIONS OF UTILITY LINES ON LANDSCAPE PLAN, | | | ALSO LOCATIONS OF FDC, VALVES AND BACKFLOW PREVENTERS | | | AND FPL TRANSFORMERS. INDICATE HOW THE OVERHEAD LINES | | | IN THE ADJACENT ALLEY WILL BE ACCOMMODATED. | | | | | | 7. SHOW LOCATIONS OF ANY ROOT BARRIERS REQUIRED TO | | | PROTECT UTILITY LINES. | | | | | | 8. SHOW LOCATIONS OF REQUIRED STRUCTURAL SOIL UNDER | | | HARDSCAPE ADJACENT TO TREES. PROVIDE A TYPICAL FOR THE | | | INSTALLATION OF THE STRUCTURAL SOIL. | | | | | | 9. SHOW COMPLIANCE WITH SECTION 94-445 L. PLANT | | | SPECIES. A MINIMUM OF 60 PERCENT OF PLANT MATERIAL | | | ADDED SHALL BE FLORIDA NATIVE OR DROUGHT TOLERANT | | | SPECIES SELECTED FROM THE CITY LIST OR THE LIST OF | | | SPECIES IN THE MOST RECENT EDITION OF SOUTH FLORIDA | | | WATER MANAGEMENT DISTRICT WATERWISE SOUTH FLORIDA | | | LANDSCAPES. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | STREET TREES AND RIGHT OF WAY LANDSCAPING AND | | | IRRIGATION APPROVED WITH THIS PETITION. | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A | | | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
3 |
Status |
F |
Date |
03-04-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
03-04-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
03-04-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-03-04 15:21:35 | PLEASE PROVIDE: | | | 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID | | | WASTE VOLUME PRODUCED ALONG WITH THE SIZE AND TYPE OF | | | THE CONTAINER THAT WILL BE UTILIZED THAT WILL BE | | | UTILIZED FOR THE SANITATION SERVICE. | | | 2-AUTOTURN (DYNAMIC ENVELOPE AND THE TIRES PATH) FOR | | | THE SANITATION SERVICE, FRONT LOADER TRUCK WITH THE | | | FOLLOWING SPECS: | | | - TRUCK LENGTH: 35 FT | | | - TRUCK WIDTH: 11 FT | | | - TURNING RADIUS: | | | - SAE TURNING RADIUS: 32.5 FT | | | - CURB-TO-CURB DIAMETER: 74 FT | | | - WALL-TO-WALL DIAMETER: 86.3 FT | | | | | | | | | | | | DEPT. OF PUBLIC WORKS | | | MATT HEJAZI | | | [email protected] | | | 561-822-2045 |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
2 |
Status |
F |
Date |
05-08-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
05-08-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
05-08-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-05-08 08:42:41 | PLEASE PROVIDE LOS (LEVEL OF SERVICE ANALYSIS) TO | | | REFLECT THE SOLID WASTE VOLUME PRODUCED ALONG WITH THE | | | SIZE AND TYPE OF THE CONTAINER THAT WILL BE UTILIZED | | | THAT WILL BE UTILIZED FOR THE SANITATION SERVICE. | | | | | | DEPT. OF PUBLIC WORKS | | | MATT HEJAZI | | | [email protected] | | | 561-822-2045 |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
F |
Date |
11-07-2019 |
|
|
Cont ID |
|
| Sent By |
|
Date |
11-07-2019 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
11-07-2019 |
Time |
|
Sent To |
|
|
| Notes |
| 2019-11-07 08:57:07 | PLEASE PROVIDE A PLAN SHOWING AUTO-TURN FOR SANITATION | | | SERVICE. | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
3 |
Status |
F |
Date |
03-26-2021 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
03-26-2021 |
Time |
10:30 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
03-26-2021 |
Time |
11:37 |
Sent To |
|
|
| Notes |
| 2021-03-26 11:35:30 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 3/2/2021 SUBMITTAL REVIEW SET. | | | | | | 1. THERE APPEAR TO BE A MIXTURE OF NAVD1988 AND | | | NGVD1929 ELEVATIONS ON THE PLANS. ALL ELEVATION | | | INFORMATION (FFE, SPOT GRADES, INVERT/RIM ELEVATIONS, | | | ETC.) SHOULD REFERENCE THE SAME VERTICAL DATUM. | | | | | | 2. LIST THE VERTICAL DATUM REFERENCE ON ALL SHEETS | | | (INCLUDING DETAIL SHEETS) WITH ELEVATION INFORMATION | | | AND PROVIDE THE CONVERSION TO NGVD1929. | | | | | | 3. CAN MH#3 BE MOVED FURTHER EAST? IT'S NOT CLEAR WHERE | | | THE CORNER OF THE BUILDING IS AT THE EAST SIDE OF THE | | | EAST DRIVEWAY. | | | | | | 4. REMOVE THE EXFILTRATION TRENCH OUT OF THE RIGHT OF | | | WAY. | | | | | | 5. MOVE THE DRAINAGE CONTROL STRUCTURE (WEIR) OUT OF | | | THE RIGHT OF WAY. | | | | | | 6. ALL STORM PIPE WITHIN THE RIGHT OF WAY TO BE RCP, | | | MINIMUM 15" IN DIAMETER. | | | | | | 7. ON SECTION B-B ON PAGE C-9, IT APPEARS THERE IS A | | | GRADE BREAK OF THE ROADWAY SURFACE NEAR THE VALLEY | | | GUTTER. THE VALLEY GUTTER SHOULD BE LABELED AS 2' | | | INSTEAD OF 1.50'. | | | | | | 8. SHOW TYPE 'F' C&G FOR SECTION C-C INSTEAD OF | | | EXISTING TYPE 'D'. | | | | | | 9. SECTION D-D FOR THE 15.6' WIDE SIDEWALK ON S. DIXIE | | | HWY SHOWS MAX. 2% CROSS SLOPE OR 3.75 INCHES OF | | | VERTICAL FALL FROM BUILDING FACE TO BACK OF CURB. THE | | | FFE OF 15.0 FT NAVD IS MORE THAN 2 FEET HIGHER THAN THE | | | BACK OF CURB. HOW WILL THE SIDEWALK BE GRADED, | | | PARTICULARLY AT THE DOORWAY ENTRANCE TO THE RETAIL AREA | | | AT THE SOUTHEAST CORNER OF THE BUILDING? THE VERTICAL | | | DIFFERENCE MAY NEED TO BE MADE UP INSIDE THE BUILDING | | | INSTEAD OF RAISING THE SIDEWALK GRADES. IS THERE A | | | WHEEL CHAIR RAMP FROM THE PUBLIC SIDEWALK TO THE | | | LOUNGE? | | | | | | 10. THERE ARE STEPS SHOWN AT THE SOUTH END OF THE | | | BUILDING. WILL THE SIDEWALK MEET ADA SLOPE CRITERIA | | | ADJACENT TO THE STEPS? | | | | | | 11. IT APPEARS SURFACE RUNOFF ON GARDENIA STREET WILL | | | FLOW WEST FROM THE EAST DRIVEWAY TO PROPOSED CB C-4. | | | EXTEND THE TYPE 'F' C&G TO THE CATCH BASIN. | | | | | | 12. THE VALVE BOX FOR THE FIRE HYDRANT SHALL NOT FALL | | | WITHIN THE GUTTER. | | | | | | TRACY WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120(O) | | | 561-351-0510 (M) | | | [email protected] | | | | | | | | | | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
F |
Date |
05-04-2020 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
05-04-2020 |
Time |
14:12 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
05-04-2020 |
Time |
14:35 |
Sent To |
|
|
| Notes |
| 2020-05-04 14:35:48 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 4/20/2020 SUBMITTAL PACKAGE. | | | | | | 1. MOVE DRAINAGE STRUCTURE NO. 3 OUT OF THE DRIVEWAY | | | FOR SAFETY AND TO AVOID BLOCKAGE OF THE DRIVEWAY WHEN | | | THE MANHOLE IS OPENED. | | | | | | 2. COORDINATE INFORMATION SHOWN ON THE DEMOLITION PLAN, | | | PGD PLAN AND STRIPING PLAN. FOR EXAMPLE, THE DEMO. | | | PLANS CALLS OUT REMOVAL OF CURBING AND STRIPING TO NEAR | | | QUADRILLE BLVD. BUT THERE IS STRIPING SHOWN WEST OF THE | | | WEST PROPERTY LINE AND THE PGD PLAN CALLS OUT EXISTING | | | CURBING ALONG THE EXISTING PARKING SPACES. COORDINATE | | | THE EXTENT OF CURB REMOVAL WITH THE TRANSPORTATION | | | ENGINEER. | | | | | | 3. PROVIDE THREE CROSS SECTIONS ALONG GARDENIA (EAST OF | | | DRIVEWAY NEAR FDC), AT ONE OF THE DRIVEWAYS AND WEST OF | | | THE DRIVEWAY AT THE STAIRWELL), ONE CROSS SECTION ON S. | | | DIXIE HWY AND ONE SECTION ON THE ALLEY. FOR THE ROADWAY | | | SECTIONS SHOW THE RIGHT OF WAY CENTERLINE, PROPERTY | | | LINE, PAVEMENT WIDTH (OPPOSITE SIDE EDGE OF PAVEMENT OR | | | FACE OF CURB TO NEARSIDE EDGE OF PAVEMENT) AND MINIMUM | | | SETBACKS FROM BACK OF CURB TO FACE OF BUILDING, | | | SIDEWALK WIDTH, PARKING WIDTH, CURB WIDTH, ETC., AND | | | APPROXIMATE SLOPES.FOR THE ALLEY CROSS SECTION , SHOW | | | BUIDLING FACES, RIGHT-OF-WAY LINES, PAVEMENT SLOPE | | | DIRECTIONS (INVERTED/NORMAL CROWN OR SHED SECTION) AND | | | HORIZONTAL DIMENSIONS BETWEEN FACE OF BUILDING AND | | | RIGHT-OF-WAY. | | | | | | 4. CAN FH BE INSTALLED CLOSER TO S. DIXIE HWY? | | | | | | 5. STOP SIGN IS SHOWN ON THE LEFT SIDE OF THE STOP BAR. | | | WILL "DO NOT ENTER" SIGNS OR DIRECTIONAL ARROWS ON THE | | | PAVEMENT BE NEEDED? | | | | | | THE HGL ANALYSIS OF OFFSITE THE DRAINAGE SYSTEM CAN BE | | | PROVIDED WITH THE ENGINEERING PERMIT SUBMITTAL. | | | | | | TRACY WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
11-13-2019 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
11-13-2019 |
Time |
09:41 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
11-13-2019 |
Time |
09:42 |
Sent To |
|
|
| Notes |
| 2019-11-13 09:42:07 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT | | | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT | | | | | | HTTPS://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FO | | | RMS,-PERMITS-APPLICATIONS | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. REMOVE THE EXISTING DRAINAGE PIPE FROM THE PARKING | | | LOT TO THE INLET ON S. DIXIE HWY. | | | | | | 2. EXPLAIN WHAT AND 'IDB' IS (SEE CATCH BASIN NO. 2) | | | | | | 3. PROVIDE INFORMATION ON THE STORMWATER MANAGEMENT | | | RETENTION VAULT STORAGE. | | | | | | 4. IDENTIFY THE CONTROL STRUCTURE FOR THE EXFILTRATION | | | TRENCH. | | | | | | 5. CALCULATION THE CHANGE IN HGL FOR THE INLET ON | | | GARDENIA ST. | | | | | | 6. ARE THE TRENCH DRAINS ACROSS THE DRIVEWAYS | | | NECESSARY? THEY APPEAR TO BE AT HIGH POINTS OF THE | | | DRIVEWAYS. | | | | | | 7. EXTEND THE TYPE 'F' CURB AND GUTTER TO THE WEST | | | PROPERTY CORNER. | | | | | | 8. LABEL THE VERTICAL DATUM ON ALL SHEETS WITH | | | ELEVATION DATA AND PROVIDE THE CONVERSION EQUATION TO | | | NGVD1929. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY | | | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. | | | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS | | | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE | | | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS | | | | | | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED | | | WITH THE ENGINEERING PERMIT APPLICATION. | | | | | | 3. PROVIDE A COPY OF THE SFWMD ERP PRIOR TO STARTING | | | CONSTRUCTION. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
4 |
Status |
P |
Date |
06-30-2021 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
06-30-2021 |
Time |
07:51 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-06-30 07:50:57 | CONDITIONS OF APPROVAL: | | | | | | 1. MAINTENANCE AGREEMENT PRIOR TO C.O. | | | 2. SURVEY IS STILL NOT SIGNED. | | | | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
3 |
Status |
F |
Date |
03-10-2021 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
03-10-2021 |
Time |
12:40 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-03-10 12:50:59 | 1. NEED SIGNED AND SEALED COPY OF UPDATED SURVEY. | | | 2. NEED MORE DETAILS SHOWING CANOPY BETWEEN HOTELS. NOT | | | CONSISTENTLY SHOWN ON PLANS.SANITATION AND PUBLIC | | | UTILITIES NEED TO APPROVE HEIGHT. | | | 3. AS PREVIOUSLY STATED, SEPARATE CANOPY AGREEMENT WILL | | | BE REQUIRED. | | | 4. MAINTENANCE AGREEMENT FOR GARDENIA AND DIXIE WILL BE | | | REQUIRED. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
F |
Date |
05-01-2020 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
05-01-2020 |
Time |
07:44 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-05-01 07:44:40 | 1. SURVEY SHOULD ONLY INCLUDE PARCEL 1. | | | 2. UNITY OF TITLE WILL BE REQUIRED. | | | 3. REMOVE POSSIBLE FUTURE CONNECTION BETWEEN HOTELS AS | | | NOT INCLUDED IN THE SUBMITTAL. A SEPARATE AGREEMENT | | | WILL BE REQUIRED. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
11-13-2019 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
11-13-2019 |
Time |
08:24 |
Rev Time |
|
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2019-11-13 09:12:05 | 1. ARE ANY IMPROVEMENTS PROPOSED TO THE EXISTING HOTEL | | | SITE? | | | 2. SURVEY NEEDS TO BE UPDATED. | | | 3. METERS AND VAULT LOCATION WILL NEED APPROVAL FROM | | | MARK HURLEY, CUSTOMER SERVICE. | | | 4. MAINTENANCE AGREEMENT WILL BE REQUIRED FOR GARDENIA | | | AND DIXIE. | | | 5. STORMWATER WILL REVIEW PROPOSED DRAINAGE IN | | | GARDENIA. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
6 |
Status |
F |
Date |
07-20-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
07-20-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-07-20 15:22:53 | TRAFFIC STUDY COMMENTS: | | | 1. SATISFIED. THE SITE PLAN SHOWS A 132-UNITS HOTEL | | | PLUS PENTHOUSE AND 3,207 SF RETAIL, BUT THE TRIP | | | GENERATION ASSUMES 128-UNITS HOTEL WITH ONE RESIDENTIAL | | | CONDO DWELLING UNIT. PROVIDE REVISED TRAFFIC ANALYSIS | | | ONCE AVAILABLE. | | | 2. SATISFIED. PROVIDE TRIP DISTRIBUTION WITHIN THE | | | RADIUS OF INFLUENCE PER COUNTY TPS. EVEN IF THE | | | DEVELOPMENT IS WITHIN A TCEA, THE CITY CAN REQUEST MORE | | | IN-DEPTH ANALYSIS. | | | 3. SATISFIED. PERFORM TEST 1 AND 2 PER COUNTY TPS. EVEN | | | IF THE DEVELOPMENT IS WITHIN A TCEA, THE CITY CAN | | | REQUEST MORE IN-DEPTH ANALYSIS. THE PROPOSED | | | DEVELOPMENT FAILS TEST 1 PART II, AS IT SIGNIFICANTLY | | | IMPACTS QUADRILLE BLVD AND GARDENIA. FURTHER MITIGATION | | | AND TRANSPORTATION DEMAND MANAGEMENT INITIATIVES SHALL | | | BE DISCUSSED WITH PLANNING AND ENGINEERING. | | | 4. SATISFIED. PROVIDE AM/PM PEAK HOUR AND DAILY | | | DRIVEWAY VOLUMES. EVEN IF THE DEVELOPMENT IS WITHIN A | | | TCEA, THE CITY CAN REQUEST MORE IN-DEPTH ANALYSIS | | | 5. SATISFIED. EVEN IF THE DEVELOPMENT IS WITHIN A TCEA, | | | THE CITY CAN REQUEST MORE IN-DEPTH ANALYSIS. PROVIDE | | | INTERSECTION ANALYSIS FOR THE FOLLOWING: | | | A. QUADRILLE AND GARDENIA | | | B. S DIXIE AND GARDENIA | | | 6. PARTIALLY SATISFIED. PROVIDE QUEUING ANALYSIS FOR | | | THE VALET OPERATIONS. EVEN IF THE DEVELOPMENT IS WITHIN | | | A TCEA, THE CITY CAN REQUEST MORE IN-DEPTH ANALYSIS. | | | PROVIDE AN ANALYSIS BASED ON ASSUMED STAFFING | | | PERSONNEL. | | | 7. SATISFIED. PLEASE CLARIFY THE VALET OPERATIONS AND | | | THE CIRCULATION ROUTES. ALL VALET CIRCULATION ROUTES | | | MUST BE CONTAINED ON-SITE AND SHOULD NOT USE CITY | | | STREETS (I.E. CANNOT CIRCULATE AROUND CITY BLOCKS FOR | | | PICK-UP AND/OR DELIVERY OPERATIONS). EVEN IF THE | | | DEVELOPMENT IS WITHIN A TCEA, THE CITY CAN REQUEST MORE | | | IN-DEPTH ANALYSIS. THE SITE PLAN DOES NOT SHOW THE | | | REQUESTED INFORMATION. BASED ON THE TRAFFIC STUDY, IT | | | SEEMS THAT VALET OPERATIONS ARE CONDUCTED AGAINST CITY | | | CODE, AS VEHICLES BELONGING TO RESIDENCE INN PATRONS | | | ARE DRIVEN TO/FROM THE AC MARRIOTT HOTEL PARKING GARAGE | | | USING CITY STREETS. SUCH OPERATIONS WOULD NOT BE | | | ALLOWED. | | | 8. SATISFIED. CLARIFY PARKING ARRANGEMENTS WITH | | | EXISTING MARRIOTT HOTEL DURING CONSTRUCTION PHASE(S) | | | AND AT BUILD-OUT. PLEASE PROVIDE MORE DETAILS | | | PERTAINING THE ALTERNATIVE ARRANGEMENTS. | | | 9. NOT SATISFIED. PROVIDE COUNTY TPS LETTER, ONCE | | | AVAILABLE. | | | | | | SITE PLAN COMMENTS: | | | 10. PARTIALLY SATISFIED. PAYMENT WILL BE REQUIRED FOR | | | REMOVAL OF ON-STREET PARKING SPACES ALONG GARDENIA. | | | PLEASE COORDINATE WITH PARKING ADMINISTRATION FOR THE | | | PROCESS AND PROVIDE OUTCOME OF SUCH PROCEEDING. | | | 11. SATISFIED. GARAGE DRIVING AISLE SHOULD HAVE A | | | MINIMUM OF 24 FEET WIDTH WHEREVER SELF-PARKING VEHICLES | | | TRAVERSE | | | 12. SATISFIED. PROVIDE CIRCULATION ROUTES AND SHOW | | | AUTOTURN PATHS FOR ALL DELIVERY, SERVICE VEHICLES AND | | | GARBAGE TRUCKS. ANALYSIS SHOWS GARBAGE TRUCK | | | ENCROACHMENT WITH A BUILDING AT THE ALLEYWAY AND | | | QUADRILLE INTERSECTION. MOREOVER, EVEN THOUGH THE TRUCK | | | TAKES A WIDE TURN AT DIXIE, IT STILL ENCROACHES PRIVATE | | | ROW. DUE TO SUCH CONDITIONS, SANITATION OPERATION MAY | | | NOT BE FEASIBLE THROUGH THE ALLEYWAY. | | | | | | CONDITIONS: | | | 1. NO SELF-PARKING SHALL BE ALLOWED INSIDE THE GARAGE | | | WHEREVER PARKING AISLE IS LESS THAN 24? WIDE. | | | 2. PROVIDE EASEMENT FOR THE PORTION OF SIDEWALK OUTSIDE | | | PUBLIC RIGHT-OF-WAY. | | | 3. PROVIDE MICROMOBILITY FACILITIES ON-SITE. | | | SPECIFICALLY: IDENTIFY AND DESIGNATE AN EASILY | | | ACCESSIBLE MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20 | | | FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS | | | (CIRCUIT BOX AND ELECTRIC CONDUIT). CLEARLY DEPICT THE | | | DESIGNATED SPACE ON THE SITE PLAN. | | | 4. PROPOSE TDM MEASURES TO BE IMPLEMENTED AS PART OF | | | THE DEVELOPMENT, SUCH AS: | | | A. PARKING CASH-OUT PROGRAM FOR EMPLOYEES | | | B. TRANSIT PASS SUBSIDY FOR EMPLOYEES | | | C. SECURE BIKE PARKING FOR EMPLOYEES | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
5 |
Status |
F |
Date |
06-30-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
06-30-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-06-30 22:33:48 | TRAFFIC STUDY COMMENTS: | | | 1. SATISFIED. THE SITE PLAN SHOWS A 132-UNITS HOTEL | | | PLUS PENTHOUSE AND 3,207 SF RETAIL, BUT THE TRIP | | | GENERATION ASSUMES 128-UNITS HOTEL WITH ONE RESIDENTIAL | | | CONDO DWELLING UNIT. PROVIDE REVISED TRAFFIC ANALYSIS | | | ONCE AVAILABLE. | | | 2. SATISFIED. PROVIDE TRIP DISTRIBUTION WITHIN THE | | | RADIUS OF INFLUENCE PER COUNTY TPS. EVEN IF THE | | | DEVELOPMENT IS WITHIN A TCEA, THE CITY CAN REQUEST MORE | | | IN-DEPTH ANALYSIS. | | | 3. PARTIALLY SATISFIED. PERFORM TEST 1 AND 2 PER COUNTY | | | TPS. EVEN IF THE DEVELOPMENT IS WITHIN A TCEA, THE CITY | | | CAN REQUEST MORE IN-DEPTH ANALYSIS. THE PROPOSED | | | DEVELOPMENT FAILS TEST 1 PART II, AS IT SIGNIFICANTLY | | | IMPACTS QUADRILLE BLVD AND GARDENIA. FURTHER MITIGATION | | | AND TRANSPORTATION DEMAND MANAGEMENT INITIATIVES SHALL | | | BE DISCUSSED WITH PLANNING AND ENGINEERING. | | | 4. SATISFIED. PROVIDE AM/PM PEAK HOUR AND DAILY | | | DRIVEWAY VOLUMES. EVEN IF THE DEVELOPMENT IS WITHIN A | | | TCEA, THE CITY CAN REQUEST MORE IN-DEPTH ANALYSIS | | | 5. SATISFIED. EVEN IF THE DEVELOPMENT IS WITHIN A TCEA, | | | THE CITY CAN REQUEST MORE IN-DEPTH ANALYSIS. PROVIDE | | | INTERSECTION ANALYSIS FOR THE FOLLOWING: | | | A. QUADRILLE AND GARDENIA | | | B. S DIXIE AND GARDENIA | | | 6. PARTIALLY SATISFIED. PROVIDE QUEUING ANALYSIS FOR | | | THE VALET OPERATIONS. EVEN IF THE DEVELOPMENT IS WITHIN | | | A TCEA, THE CITY CAN REQUEST MORE IN-DEPTH ANALYSIS. | | | PROVIDE AN ANALYSIS BASED ON ASSUMED STAFFING | | | PERSONNEL. | | | 7. NOT SATISFIED. PLEASE CLARIFY THE VALET OPERATIONS | | | AND THE CIRCULATION ROUTES. ALL VALET CIRCULATION | | | ROUTES MUST BE CONTAINED ON-SITE AND SHOULD NOT USE | | | CITY STREETS (I.E. CANNOT CIRCULATE AROUND CITY BLOCKS | | | FOR PICK-UP AND/OR DELIVERY OPERATIONS). EVEN IF THE | | | DEVELOPMENT IS WITHIN A TCEA, THE CITY CAN REQUEST MORE | | | IN-DEPTH ANALYSIS. THE SITE PLAN DOES NOT SHOW THE | | | REQUESTED INFORMATION. BASED ON THE TRAFFIC STUDY, IT | | | SEEMS THAT VALET OPERATIONS ARE CONDUCTED AGAINST CITY | | | CODE, AS VEHICLES BELONGING TO RESIDENCE INN PATRONS | | | ARE DRIVEN TO/FROM THE AC MARRIOTT HOTEL PARKING GARAGE | | | USING CITY STREETS. SUCH OPERATIONS WOULD NOT BE | | | ALLOWED. | | | 8. PARTIALLY SATISFIED. CLARIFY PARKING ARRANGEMENTS | | | WITH EXISTING MARRIOTT HOTEL DURING CONSTRUCTION | | | PHASE(S) AND AT BUILD-OUT. PLEASE PROVIDE MORE DETAILS | | | PERTAINING THE ALTERNATIVE ARRANGEMENTS. | | | 9. NOT SATISFIED. PROVIDE COUNTY TPS LETTER, ONCE | | | AVAILABLE. | | | SITE PLAN COMMENTS: | | | 10. PARTIALLY SATISFIED. PAYMENT WILL BE REQUIRED FOR | | | REMOVAL OF ON-STREET PARKING SPACES ALONG GARDENIA. | | | PLEASE COORDINATE WITH PARKING ADMINISTRATION FOR THE | | | PROCESS AND PROVIDE OUTCOME OF SUCH PROCEEDING. | | | 11. SATISFIED. GARAGE DRIVING AISLE SHOULD HAVE A | | | MINIMUM OF 24 FEET WIDTH WHEREVER SELF-PARKING VEHICLES | | | TRAVERSE | | | 12. PARTIALLY SATISFIED. PROVIDE CIRCULATION ROUTES AND | | | SHOW AUTOTURN PATHS FOR ALL DELIVERY, SERVICE VEHICLES | | | AND GARBAGE TRUCKS. ANALYSIS SHOWS GARBAGE TRUCK | | | ENCROACHMENT WITH A BUILDING AT THE ALLEYWAY AND | | | QUADRILLE INTERSECTION. MOREOVER, EVEN THOUGH THE TRUCK | | | TAKES A WIDE TURN AT DIXIE, IT STILL ENCROACHES PRIVATE | | | ROW. DUE TO SUCH CONDITIONS, SANITATION OPERATION MAY | | | NOT BE FEASIBLE THROUGH THE ALLEYWAY. | | | | | | CONDITIONS: | | | 1. NO SELF-PARKING SHALL BE ALLOWED INSIDE THE GARAGE | | | WHEREVER PARKING AISLE IS LESS THAN 24 FEET WIDE. | | | 2. PROVIDE EASEMENT FOR THE PORTION OF SIDEWALK OUTSIDE | | | PUBLIC RIGHT-OF-WAY. | | | 3. PROVIDE MICROMOBILITY FACILITIES ON-SITE. | | | SPECIFICALLY: IDENTIFY AND DESIGNATE AN EASILY | | | ACCESSIBLE MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20 | | | FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS | | | (CIRCUIT BOX AND ELECTRIC CONDUIT). CLEARLY DEPICT THE | | | DESIGNATED SPACE ON THE SITE PLAN. | | | 4. PROVIDE TDM MEASURES TO BE IMPLEMENTED AS PART OF | | | THE DEVELOPMENT, INCLUDING BUT NOT LIMITED TO: | | | A. UNBUNDLED PARKING/PARKING CASH-OUT PROGRAM FOR | | | EMPLOYEES | | | B. TRANSIT PASS SUBSIDY FOR EMPLOYEES | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
4 |
Status |
F |
Date |
03-29-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
03-29-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-03-29 14:24:48 | TRAFFIC STUDY COMMENTS: | | | 1. THE SITE PLAN SHOWS A 132-UNITS HOTEL PLUS PENTHOUSE | | | AND 3,207 SF RETAIL, BUT THE TRIP GENERATION ASSUMES | | | 128-UNITS HOTEL WITH ONE RESIDENTIAL CONDO DWELLING | | | UNIT. PROVIDE REVISED TRAFFIC ANALYSIS ONCE AVAILABLE. | | | 2. PROVIDE TRIP DISTRIBUTION WITHIN THE RADIUS OF | | | INFLUENCE PER COUNTY TPS. EVEN IF THE DEVELOPMENT IS | | | WITHIN A TCEA, THE CITY CAN REQUEST MORE IN-DEPTH | | | ANALYSIS. | | | 3. PERFORM TEST 1 AND 2 PER COUNTY TPS. EVEN IF THE | | | DEVELOPMENT IS WITHIN A TCEA, THE CITY CAN REQUEST MORE | | | IN-DEPTH ANALYSIS. | | | 4. PROVIDE AM/PM PEAK HOUR AND DAILY DRIVEWAY VOLUMES. | | | EVEN IF THE DEVELOPMENT IS WITHIN A TCEA, THE CITY CAN | | | REQUEST MORE IN-DEPTH ANALYSIS | | | 5. EVEN IF THE DEVELOPMENT IS WITHIN A TCEA, THE CITY | | | CAN REQUEST MORE IN-DEPTH ANALYSIS. PROVIDE | | | INTERSECTION ANALYSIS FOR THE FOLLOWING: | | | 5A. QUADRILLE AND GARDENIA | | | 5B. S DIXIE AND GARDENIA | | | 6. PROVIDE QUEUING ANALYSIS FOR THE VALET OPERATIONS. | | | EVEN IF THE DEVELOPMENT IS WITHIN A TCEA, THE CITY CAN | | | REQUEST MORE IN-DEPTH ANALYSIS | | | 7. PLEASE CLARIFY THE VALET OPERATIONS AND THE | | | CIRCULATION ROUTES. ALL VALET CIRCULATION ROUTES MUST | | | BE CONTAINED ON-SITE AND SHOULD NOT USE CITY STREETS | | | (I.E. CANNOT CIRCULATE AROUND CITY BLOCKS FOR PICK-UP | | | AND/OR DELIVERY OPERATIONS). EVEN IF THE DEVELOPMENT IS | | | WITHIN A TCEA, THE CITY CAN REQUEST MORE IN-DEPTH | | | ANALYSIS | | | 8. CLARIFY PARKING ARRANGEMENTS WITH EXISTING MARRIOTT | | | HOTEL DURING CONSTRUCTION PHASE(S) AND AT BUILD-OUT. | | | 9. PROVIDE COUNTY TPS LETTER, ONCE AVAILABLE. | | | | | | SITE PLAN COMMENTS: | | | 10. PAYMENT WILL BE REQUIRED FOR REMOVAL OF ON-STREET | | | PARKING SPACES ALONG GARDENIA. PLEASE COORDINATE WITH | | | PARKING ADMINISTRATION FOR THE PROCESS AND PROVIDE | | | OUTCOME OF SUCH PROCEEDING. | | | 11. GARAGE DRIVING AISLE SHOULD HAVE A MINIMUM OF 24 | | | FEET WIDTH WHEREVER SELF-PARKING VEHICLES TRAVERSE | | | 12. PROVIDE CIRCULATION ROUTES AND SHOW AUTOTURN PATHS | | | FOR ALL DELIVERY, SERVICE VEHICLES AND GARBAGE TRUCKS. | | | | | | CONDITIONS: | | | 1. NO SELF-PARKING SHALL BE ALLOWED INSIDE THE GARAGE | | | WHEREVER PARKING AISLE IS LESS THAN 24 FEET WIDE. | | | 2. PROVIDE EASEMENT FOR THE PORTION OF SIDEWALK OUTSIDE | | | PUBLIC RIGHT-OF-WAY. | | | 3. PROVIDE MICROMOBILITY FACILITIES ON-SITE | | | 4. PROVIDE TDM MEASURES TO BE IMPLEMENTED AS PART OF | | | THE DEVELOPMENT, INCLUDING BUT NOT LIMITED TO: | | | 4A. UNBUNDLED PARKING/PARKING CASH-OUT PROGRAM FOR | | | EMPLOYEES | | | 4B. TRANSIT PASS SUBSIDY FOR EMPLOYEES | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
3 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
05-05-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-05-05 14:19:24 | TRAFFIC STUDY COMMENTS: | | | 1. THE SITE PLAN SHOWS A 132-UNITS HOTEL PLUS PENTHOUSE | | | AND 3,207 SF RETAIL, BUT THE TRIP GENERATION ASSUMES | | | 128-UNITS HOTEL WITH ONE RESIDENTIAL CONDO DWELLING | | | UNIT. PLEASE VERIFY AND REVISE. | | | 2. PROVIDE TRIP DISTRIBUTION WITHIN THE RADIUS OF | | | INFLUENCE PER COUNTY TPS. | | | 3. PERFORM TEST 1 AND 2 PER COUNTY TPS. | | | 4. PROVIDE AM/PM PEAK HOUR AND DAILY DRIVEWAY VOLUMES. | | | 5. PROVIDE INTERSECTION ANALYSIS FOR THE FOLLOWING: | | | A. QUADRILLE AND GARDENIA | | | B. S DIXIE AND GARDENIA | | | 6. PROVIDE QUEUING ANALYSIS FOR THE VALET OPERATIONS. | | | 7. PLEASE CLARIFY THE VALET OPERATIONS AND THE | | | CIRCULATION ROUTES. ALL VALET CIRCULATION ROUTES MUST | | | BE CONTAINED ON-SITE AND SHOULD NOT USE CITY STREETS | | | (I.E. CANNOT CIRCULATE AROUND CITY BLOCKS FOR PICK-UP | | | AND/OR DELIVERY OPERATIONS). | | | 8. CLARIFY PARKING ARRANGEMENTS WITH EXISTING MARRIOTT | | | HOTEL DURING CONSTRUCTION PHASE(S) AND AT BUILD-OUT. | | | 9. PROVIDE COUNTY TPS LETTER. | | | | | | | | | SITE PLAN COMMENTS: | | | 10. INDICATE THE MINIMUM REQUIRED AND MAXIMUM ALLOWABLE | | | NUMBER OF VEHICULAR PARKING SPACES BY CITY CODE ON THE | | | SITE DATA TABLE. | | | 11. INDICATE THE NUMBER OF BICYCLE PARKING SPACES | | | PROVIDED AND INCLUDE IT IN THE SITE DATA TABLE. | | | 12. INDICATE THE LOCATION OF THE REQUIRED SHOWER | | | FACILITY FOR EMPLOYEES ON THE SITE PLAN. | | | 13. CITY CODE REQUIRES 76 MINIMUM PARKING SPACES, BUT | | | 235 SPACES ARE PROVIDED. PLEASE CLARIFY WHY SO MANY | | | PARKING SPACES ARE NEEDED. | | | 14. INDICATE THE NUMBER AND PERCENTAGE OF COMPACT | | | PARKING SPACES. ALL COMPACT SPACES SHOULD BE MARKED | | | WITH CORRESPONDING PAVEMENT MARKING. | | | 15. ALL PARKING SPACES NEXT TO WALLS SHOULD INCLUDE 1 | | | TO 2 FEET CLEARANCE PER CITY CODE 94-111(C). PLEASE | | | VERIFY. | | | 16. DIMENSION ALL PARKING AISLE WIDTH, INCLUDING THE | | | SHORT PARKING AISLES IN THE GARAGE. | | | 17. PAYMENT WILL BE REQUIRED FOR REMOVAL OF ON-STREET | | | PARKING SPACES ALONG GARDENIA. PLEASE COORDINATE WITH | | | PARKING ADMINISTRATION FOR THE PROCESS AND DETAILS. | | | 18. THE DEMO PLAN (C-03) SHOWS THAT THE EXISTING CURB | | | AND PARKING STALL STRIPING ON GARDENIA STREET ARE | | | REMOVED BUT SOME OF THEM ARE NOT RE-CONSTRUCTED PER | | | OTHER PLAN SHEETS. PLEASE CLARIFY. | | | 19. ON THE PAVING, MARKING AND SIGNAGE PLAN SHEET | | | (C-11), SHOW HOW THE NEW PARKING STALL STRIPING ARE | | | COMPATIBLE WITH THE EXISTING PARKING STALL STRIPING | | | WEST OF THE SITE ON GARDENIA STREET. | | | 20. PROVIDE CIRCULATION ROUTES AND SHOW AUTOTURN PATHS | | | FOR ALL DELIVERY, SERVICE VEHICLES AND GARBAGE TRUCKS. | | | 21. SHOW THE REQUIRED 20-FOOT VISIBILITY TRIANGLE AT | | | THE CORNER OF GARDENIA STREET/DIXIE HIGHWAY AND DIXIE | | | HIGHWAY/ALLEY. | | | 22. ON THE PAVING, MARKING AND SIGNAGE PLAN SHEET | | | (C-11), "DO NOT ENTER" SIGNS SHOULD BE PROVIDED ON THE | | | ONE-WAY ENTRY AND EXIT AT THE SITE DRIVEWAY AS | | | APPROPRIATE. | | | 23. AT A MINIMUM, THE ROAD SHALL BE MILLED/RESURFACED | | | AT MIN OF 1 INCH FOR FULL LANE WIDTH OF THE TRAVEL | | | LANE(S) ENCROACHED BY THE TRENCH AREA, INCLUDING A | | | TRANSITION AREA OF 50 FEET ON EACH SIDE OF THE TRENCH. | | | | | | | | | CONDITIONS: | | | 1. NO SELF-PARKING SHALL BE ALLOWED INSIDE THE GARAGE | | | WHEREVER PARKING AISLE IS LESS THAN 24-FOOT WIDE. | | | 2. PROVIDE EASEMENT FOR THE PORTION OF SIDEWALK OUTSIDE | | | PUBLIC RIGHT-OF-WAY. | | | 3. PROVIDE MICROMOBILITY FACILITIES ON-SITE | | | 4. PROVIDE TDM MEASURES TO BE IMPLEMENTED AS PART OF | | | THE DEVELOPMENT, INCLUDING BUT NOT LIMITED TO: | | | A. UNBUNDLED PARKING/PARKING CASH-OUT PROGRAM FOR | | | EMPLOYEES | | | B. TRANSIT PASS SUBSIDY FOR EMPLOYEES | | | | | | | | | VALERIO ORICCHIO | | | [email protected] | | | 561-494-1092 |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
2 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
11-12-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2019-11-12 14:56:53 | ***1ST REVIEW FROM TRAFFIC*** | | | | | | TRAFFIC STUDY COMMENTS: | | | 1. PROVIDE A TRAFFIC STATEMENT. | | | 2. PROVIDE COUNTY TPS LETTER. | | | 3. INCLUDE PCN NUMBER(S) AND PROPERTY STREET | | | ADDRESS(ES) ON TRAFFIC STUDY. | | | 4. PLEASE COORDINATE WITH ENGINEERING ON THE STUDY | | | INTERSECTIONS AND TRAFFIC STUDY REQUIREMENTS. | | | SITE PLAN COMMENTS: | | | 5. REDUCE THE WIDTH OF THE TWO ONE-WAY DRIVEWAYS TO 12 | | | FEET ON GARDENIA STREET. | | | 6. CLARIFY THE OPERATION OF THE AREA IN FRONT OF THE | | | LOBBY. WOULD VALET BE PROVIDED? VEHICLE CIRCULATION | | | SHOULD BE CONTAINED ON-SITE. | | | 7. PROVIDE TURNAROUND SPACE FOR THE DEAD-END PARKING | | | SPACE ON THE 5TH FLOOR. | | | 8. PARKING AISLE WIDTH SHOULD BE 24 FEET. | | | 9. PROVIDE THE REQUIRED BICYCLE PARKING SPACES PER CITY | | | CODE 94-113. | | | 10. SHOW CURBS AND CURB-CUTS ON THE OPPOSITE SIDE OF | | | STREETS. | | | 11. SHOW FULL RIGHT-OF-WAY WIDTH AND RIGHT-OF-WAY WIDTH | | | FROM CENTERLINE ON SITE PLAN. | | | 12. PROPOSED FIRE HYDRANTS SHOULD BE LOCATED AT LEAST | | | 15 FEET FROM EXISTING PARKING SPACES AND AWAY FROM | | | PEDESTRIAN PATHS. | | | 13. PROVIDE EASEMENT FOR THE PORTION OF SIDEWALK | | | OUTSIDE PUBLIC RIGHT-OF-WAY. | | | 14. THE BUILDING DOORS SHOULD NOT OPEN INTO PEDESTRIAN | | | WALKWAY/SIDEWALK ON GARDENIA STREET. | | | 15. CLARIFY IF THERE WILL BE PEDESTRIANS ACCESSING THE | | | BUILDING VIA THE ALLEY AS THERE ARE DOORS FROM THE | | | OFFICE/WORK ROOM OPENED INTO THE ALLEY AND ACCESS TO | | | THE STAIRS. | | | 16. PLEASE CLARIFY HOW THE ALLEY IS PLANNED TO BE USED | | | RELATED TO LOADING, DELIVERY, GARBAGE COLLECTION, | | | VEHICLE CIRCULATION, ETC. | | | 17. REPAVE BOTH SIDES OF GARDENIA STREET AND THE ALLEY | | | ALONG THE SITE FRONTAGE. | | | 18. PROVIDE ON-STREET PARKING ALONG GARDENIA STREET AND | | | DIXIE HIGHWAY. | | | 19. PROVIDE AUTOTURN PATHS FOR DELIVERY AND GARBAGE | | | TRUCKS. | | | 20. CONSIDER PROVIDING BIKESHARE AND MICROMOBILITY | | | FACILITIES ON-SITE | | | 21. CONSIDER PROVIDING TDM MEASURES TO BE IMPLEMENTED | | | AS PART OF THE DEVELOPMENT, INCLUDING BUT NOT LIMITED | | | TO: | | | A. UNBUNDLED PARKING/PARKING CASH-OUT PROGRAM FOR | | | EMPLOYEES | | | B. TRANSIT PASS SUBSIDY FOR EMPLOYEES | | | | | | SHING TSOI | | | CITY IN-HOUSE TRAFFIC CONSULTANT | | | 561-494-1141 | | | [email protected] | | | (IN-HOUSE ON TUESDAYS AND WEDNESDAYS) | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
11-08-2019 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
11-08-2019 |
Time |
|
Rev Time |
4.00 |
| Received By |
rrossano |
Date |
11-08-2019 |
Time |
|
Sent To |
|
|
| Notes |
| 2019-11-08 10:08:57 | PLEASE SEE COMMENTS UNDER ENG - PPRC. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
03-22-2021 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
03-22-2021 |
Time |
16:35 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
02-19-2021 |
Time |
14:15 |
Sent To |
|
|
| Notes |
| 2021-03-17 16:31:44 | COMMENTS FOR RESUBMITTAL DATED 2-19-21 | | | PREVIOUS COMMENT 14, 15, 16 AND 30 WOULD NEED A | | | VARIANCE REQUEST TO THE DAC. | | | 1. PLEASE LIST BIKE RACKS REQUIRED ON ROW IN SITE PLAN. | | | I BIKE RACK PER EVERY 150 FEET OF FRONTAGE REQUIRED. | | | 2. PLEASE INCLUDE A PROJECT INFOR TABLE IN THE SITE | | | PLAN SHEET INCLUDING SITE AREA, MAXIMUM GROSS BUILDING | | | AREA PERMITTED, AND PROPOSED. NUMBER OF ROOMS PROPOSED, | | | RESTAURANT AND MEETING ROOMS PROPOSED, AND PARKING | | | CALCULATION. | | | 3. PLEASE CONFIRM THE CALCUALTION FOR THE GROSS | | | BUILIDING AREA IS CONSISTENT WITH THE DEFINITION IN | | | SECTION 94-109 OF THE ZLDRS. IN THE SUBMITTED SHEE | | | A0.01 AND A0.02 PLEASE CLARIFY THE DIFFERENCE BETWEEN | | | FAR AND GROSS. PLEASE USE THE DEFINITION IN SEC 94-109 | | | FOR GROSS BUILDING AREA. | | | 4. PORTE COCHERE SHALL COMPLY WITH REQUIREMENTS FOR | | | PORTE COCHERE IN SEC 94-109 AND FIGURE IV-22. | | | 5. PLEASE EXPLORE IF THE PARAPET WALL OF THE TOP LEVEL | | | OF THE GARAGE CAN BE REDUCED. | | | 5. SIGNS SHOWN IN ELEVATIONS EXCEED THE MAXIMUM NUMBER | | | ALLOWED FOR IDENTITY SIGNS. SIGNS WOULD NOT BE INCLUDED | | | IN THE SITE PLAN APROVAL. | | | 6. PLEASE PROVIDE PHOTOS OF THE WOOD-LOOK STUCCO | | | PROPOSED ON THE FACADE. | | | | | | CONDITIONS TO BE INCLUDED IN THE SITE PLAN APPROVAL: | | | 1. PROJECT SHALL PAY FOR FOUR ON-STREET PARKING SPACES | | | REMOVED. | | | 2. DEVELOPER SHALL ENTER INTO A LANDSCAPE AND HARDSCAPE | | | MAINTENANCE AGREEMENT WITH THE CITY FOR ELEMENTS | | | INSTALLED WITHIN THE ROW. | | | 3. PROPOSED CANOPY OVER ALLEY SHALL BE DETAILED FOR | | | SEPARATE REVIEW. A SEPARATE AGREEMENT WILL BE NEEDED. | | | 4. A ROW AERIAL ENCROACHMENT AGREEMENT WILL BE NEEDED | | | FOR THE CANOPY ENCROACHING OVER DIXIE HWAY ROW. A | | | SKETCH AND LEGAL DESCRIPTION WILL BE NEEDED. | | | | | | FOR RESUBMITTAL: | | | - PLEASE INCLUDE A COPY OF THE SURVEY WITH EVERY | | | RESUBMITTAL PACKAGE. | | | - PLEASE SUBMIT A RESPONSE LETTER ADDRESSING EACH OF | | | THE COMMENTS. IDENTIFY THE SHEETS WHERE THE COMMENT IS | | | ADDRESS. | | | - PLEASE SUBMIT 1 LARGE SET MAXIMUM 24" BY 36", AND A | | | DIGITAL COPY OF ALL THE DRAWINGS, RESPONSE LETTER AND | | | SUPPORT DOCUMENTATION. | | | - PLEASE UTILIZE THE GUIDELINES FOR RESUBMITTAL. A | | | MEETING WITH STAFF IS RECOMMENDED TO DISCUSS THE | | | COMMENTS. | | | | | | AS THE PROJECT IS REQUIRED TO GO TO DAC FOR THE | | | APPROVAL OF 4 VARIANCES, PLEASE SUBMIT AN APPLICATION | | | FOR DAC ONCE THE COMMENTS FROM PPRC HAVE BEEN | | | ADDRESSES. | | | | | | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA | | | APONTE AT 561-822-1439. | | | | | | | | | COMMENTS FOR RESUBMITTAL DATED 4-14-20 | | | COMMENTS ARE LISTED AS SATISFIED OR NOT SATISFIED. | | | ADDITIONAL NOTES ARE ADDED TO CLARIFY THE COMMENT. | | | SENTENCE AFTER * IS THE OLD COMMENT. | | | 1. SATISFIED-PLEASE PROVIDE A CURRENT SURVEY, NO MORE | | | THAN 1 YEAR OLD. PLEASE INCLUDE THE DIMENSION OF THE | | | EXISTING SIDEWALK IN SURVEY, AND IMPROVEMENTS ALONG | | | NORTH SIDE OF GARDENIA STREET. | | | 2. SATISFIED-PLEASE ADJUST THE SITE AREA IN SHEET A1.01 | | | TO REFLECT LOT SIZE AS INDICATED IN SURVEY. SITE IS | | | 32,522SF. PROJECT FACT SHEET ALSO HAS A DIFFERENT SITE | | | AREA (32,527SF). | | | 3. SATISFIED AT 2-19-21- NOT SATISFIED - TO CLEARLY | | | INDICATE THE AREAS COUNTED AS FAR PLEASE PROVIDE A | | | COLOR CODER FLOOR PLAN FOR EACH LEVEL INDICATING AREAS | | | COUNTED AND NOT COUNTED. ANY FULLY ENCLOSED STORAGE | | | AREAS SHALL BE COUNTED AS FAR.*PLEASE PROVIDE A | | | DETAILED ANALYSIS OF THE AREAS IDENTIFIED AS GROSS | | | BUILDING AREA (GBA) ACCORDING TO THE DEFINITION IN | | | SECTION 94-109 OF THE ZLDR. | | | 4. SATISFIED AT 2-19-21-NOT SATISFIED - PLEASE INDICATE | | | PROPERTY LINES AND MINIMUM REQUIRED SETBACK LINES IN | | | ALL FLOOR PLANS AND ELEVATIONS. | | | 5. SATISFIED AT 2-19- 21- NOT SATISFIED- PROPOSED CURB | | | CUTS ARE 17' IN WIDTH. PLEASE STUDY THE POSSIBILITY TO | | | REDUCE THE WIDTH OF THE CURB CUT TO AT LEAST 12' IN | | | WIDTH EACH.*DROP-OFF CURB CUT SHALL BE REDUCED TO A | | | MAXIMUM 12 FEET IN WIDTH, LESS IF POSSIBLE TO MINIMIZE | | | THE PEDESTRIAN IMPACT. | | | 6. SATISFIED -PLEASE COORDINATE THE PROJECT DATA IN THE | | | DIFFERENT SHEETS. PROJECT FACT SHEET INDICATES 128 | | | HOTEL ROOMS AND DOES NOT MENTION ANY RESIDENTIAL UNIT. | | | SP-1 LIST 152 HOTEL ROOMS AND DOES NOT LIST ANY | | | RESIDENTIAL UNIT, BUT SHEET A1.05 LIST 128 HOTEL ROOMS | | | AND 4,084 SF APARTMENT. PLEASE PROVIDE A CONSOLIDATED | | | PROJECT DATA IN THE SITE PLAN SHEET. | | | 7. SATISFIED AT 2-19-21- NOT SATISFIED- PARKING | | | CALCULATION IN SITE PLAN SHALL INCLUDE THE REQUIRED | | | PARKING FOR PROPOSED RETAIL AND MEETING AREAS.PLEASE | | | INCLUDE CALCULATIONS FOR REQUIRED BIKE PARKING AT 1/15 | | | PARKING SPACES PROVIDED (16 REQUIRED) + PUBLIC BIKE | | | RACKS AT 1/100 LINEAR FEET OF FRONTAGE (4 REQUIRED ON | | | SIDEWALK).* PARKING CALCULATION SHALL ACCOUNT FOR THE | | | REQUIRED PARKING ASSOCIATED WITH THE EXISTING MARRIOTT | | | RESIDENCE INN (42 PARKING SPACES). A RESTRICTIVE | | | COVENANT SHALL BE RECORDED ENSURING THE 42 SPACES ARE | | | PROVIDED FOR THE EXISTING MARRIOTT RESIDENCE INN. | | | 8. SATISFIED AT 2-19-21-NOT SATISFIED- PLEASE INCLUDE A | | | NOTE IN THE CIVIL DRAWINGS STATING THAT THE SIDEWALK | | | ELEVATION SHALL BE MAINTAINED ACROSS THE CURB | | | CUT.*SIDEWALK ELEVATION SHALL BE MAINTAINED ACROSS CURB | | | CUTS. PLEASE PROVIDE A DETAIL SPECIFICALLY ADDRESSING | | | THAT REQUIREMENT. | | | 9. NOTED- NOT SATISFIED- PLEASE INCLUDE THE APPROVED | | | COSMOPOLITAN SITE PLAN WITH YOUR SITE PLAN TO ENSURE | | | THE PROPOSED STREET DESIGN AND ON-STREET PARKING WORKS. | | | ENGINEERING NEEDS TO CONFIRM ON-STREET PARKING ON BOTH | | | SIDES OF GARDENIA IS VIABLE. *SITE PLAN INDICATES THE | | | REMOVAL OF THE 8 EXISTING ON-STREET PARKING SPACES. IS | | | THE PROJECT RELOCATING THE EXISTING CURB? PLEASE | | | INDICATE HOW THE PROPOSED CURB RELOCATION AFFECTS THE | | | WEST SIDE OF THE PROJECT AND THE EXISTING SECTION. | | | CONSIDER THE NEW PROJECT CURRENTLY APPROVED ALONG THE | | | NORTH SIDE OF GARDENIA STREET. INCORPORATE THAT PROJECT | | | IN THE SITE PLAN FOR CONTEXT PURPOSES. | | | 10. SATISFIED- A PAYMENT FOR THE FOUR SPACES REMOVED | | | WILL BE REQUIRED. *IF ON-STREET PARKING IS REMOVED, | | | PROJECT SHALL BE RESPONSIBLE FOR THE PARKING METER | | | REMOVAL FEE. | | | 11. SATISFIED AT 2-19-21-PARTIALLY SATISFIED- PLEASE | | | PROVIDE ADDITIONAL DETAILS ON THE PROPOSED FABRIC SAILS | | | TO COVER GARAGE AND INCLUDE A CALCULATION OF THE | | | PERCENTAGE COVERED BY THE PROPOSED STRUCTURE TO CONFIRM | | | COMPLIANCE WITH 30% COVERAGE. *EXPOSED PARKING DECK | | | REQUIRES 10% OF GROUND FLOOR PUBLIC OPEN SPACE. TWO | | | PROPOSED OPEN SPACES AT GROUND LEVEL DO NOT COMPLY WITH | | | THE PUBLIC OPEN SPACE REQUIREMENTS. MINIMUM SIZE IS | | | 900SF, MINIMUM ACTIVE USE ABUTMENT IS REQUIRED, AND IT | | | SHALL BE OPEN TO THE SKY. PLEASE SEE SEC 94-109 AND | | | TABLE IV-7. | | | 12. SATISFIED -* REFLECTIVE GLASS IS NOT ALLOWED AT THE | | | GROUND LEVEL, IT DOES NOT COMPLY WITH TRANSPARENCY | | | REQUIREMENTS. | | | 13. SATISFIED - * PARKING ENTRANCE CEILING SHALL BE | | | FINISHED AT A MINIMUM DEPTH OF 20 FEET. UTILITIES SHALL | | | NOT BE EXPOSED. | | | 14. NOT SATISFIED- *VARIANCE REQUEST FOR THE SETBACK | | | ABOVE 3RD FLOOR PARKING REQUIRES DAC APPROVAL. | | | 15. NOT SATISFIED -* VARIANCE REQUEST REGARDING THE | | | AISLE WIDTH REQUIRES ENGINEERING REVIEW BEFORE IT CAN | | | BE PRESENTED TO DAC FOR APPROVAL.PLEASE PROVIDE | | | INFORMATION TO JUSTIFY THE REQUEST AND PROVE THAT | | | PARKNG CIRCULATION STILL FUNCTIONS. | | | 16. NOT SATISFIED- PLEASE EXPLAIN WHY THE PLANAR BREAK | | | REQUIREMENT CANNOT BE MET. | | | 17. NOT SATISFIED- PLEASE IDENTIFY OTHER ALTERNATIVES | | | TO PROVIDE THE REQUIRED DEPTH FOR THE PLANAR BREAK. IN | | | ADDITION, THE WEST ELEVATION DOES NOT COMPLY WITH THE | | | BLANK WALL REGULATION, AND SOUTH ELEVATION (FACADE | | | CLOSEST TO DIXIE) SEEMS NOT TO COMPLY WITH THE BLANK | | | WALL REGULATION EITHER. THE PORTION OF THE SOUTH | | | ELEVATION CLOSEST TO DIXIE HWAY IS HIGHLY VISIBLE FROM | | | THE STREET AND NEEDS TO BE TREATED AS A STREET FACADE, | | | NOT AS AN ALLEY FACADE. FENESTRATION CAN BE PROVIDED. | | | PLEASE PROVIDE INFORMATION TO CONFIRM COMPLIANCE WITH | | | TABLE IV-4 REGARDING ALL ELEMENTS LISTED. BLANK WALLS | | | ARE NOT ALLOWED. PROVIDE GRAPHIC INFORMATION TO CONFIRM | | | COMPLIANCE. | | | 18. SATISFIED PLEASE CLARIFY LOCATION OF PROPOSED | | | CANOPY OVER ALLEY. PROPOSED CANOPY OVER ALLEY REQUIRES | | | AN AERIAL EASEMENT FROM THE CITY. | | | 19. NOT SATISFIED- DUE TO THE VARIANCE REQUEST PROJECT | | | IS REQUIRED TO GO TO THE DAC FOR APPROVAL OF REQUESTED | | | VARIANCES. | | | 20. SATISFIED - PLEASE PROVIDE SECTIONS OF THE PROJECT. | | | 21. PARTIALLY SATISFIED- PLEASE PROVIDE CONTEXT | | | ELEVATIONS *PLEASE PROVIDE CONTEXT COLORED ELEVATIONS | | | INCLUDING CALL OUT MATERIALS, INCLUDING PICTURES OF | | | PROPOSED MATERIALS. | | | 22. SATISFIED -PLEASE EXPLAIN GARBAGE COLLECTION | | | OPERATION. | | | 23. SATISFIED- PEASE PROVIDE INFORMATION TO CONFIRM | | | COMPLIANCE WITH BIKE PARKING REQUIREMENTS ALONG THE | | | STREET FRONTAGE (1 SPACE/ 100 FEET OF FRONTAGE, AND | | | INSIDE THE PROJECT SITE (1 BIKE SPACE/15 SPACES | | | PROVIDED). | | | 24. SATISFIED AT 2-19-21 -PARTIALLY SATISFIED - PLEASE | | | INCLUDE A NOT TO CONFIRM THE POLE AND FIXTURE ARE COLOR | | | BLACK. *PROJECT IS REQUIRED TO PROVIDE LIGHTING ALONG | | | STREET FRONTAGE WITH MINIMUM 0.6 FOOTCANDLES. PLEASE | | | PROVIDE PHOTOMETRICS AND DETAILS OF REQUIRED STREET | | | LIGHTING TO FOLLOW CITY STANDARDS. | | | | | | ADDITIONAL COMMENTS TO RESUBMITTAL 4-14-20 | | | 25. NOTSATISFIED- PLEASE ADJUST THE PARKING STALLS TO | | | MEET THE MINIMUM 8-6" AND ALLOW THE ADDITONAL SPACE (1 | | | FOOT) FOR THOSE SPACES THAT HAVE COLUMNS OR WALLS AT | | | ONE SIDE OF THE STALL. *PLEASE UPDATE PARKING STRIPING | | | DETAIL TO REFLECT CITY STANDARD. | | | 26. SATISFIED- HANDICAP SPACES NEED TO MEET THE ADA | | | REQUIREDMENTS (12' IN WIDTH WITH A 5' ACCESS AISLE). | | | 27. SATISFIED- PLEASE DIMENSIONED ALL PARKING SPACES. | | | 28. SATISFIED- PLEASE INDICATE THE LOCATION OF ENTRANCE | | | CANOPY IN THE FLOOR PLAN. AN AERIAL EASEMENT WILL BE | | | REQUIRED. | | | 29. PARTIALLY SATISFIED- PLEASE CONFIRM THE PROPOSED | | | DOORS CAN SWING INSIDE DUE TO FIRE REQUIREMENTS. IF NOT | | | PERMITTED A RECESSES AREA SHALL BE CREATED FOR THE | | | DOOR. *DOORS OPENING TO THE SIDEWALK CANNOT ENCROACH | | | INTO THE SIDEWALK PATH OF TRAVEL AND SHALL BE RECESSED. | | | PROPOSED RETAIL ON GARDENIA SHALL HAVE A DOOR FROM THE | | | STREET. | | | 30. NOT SATISFIED - PLEASE EVALUATE IF THE SOUTHERN | | | PORTION OF THE 8TH FLOOR CORRIDOR CAN BE DIRECTED INTO | | | THE STAIR, RESULTING IN ONLY A DOUBLE HIGH SPACE | | | ENCROACHING INTO THE CONDITIONAL SETBACK. * NEW EVENT | | | SPACE ON 7TH FLOOR IS DOUBLE HEIGHT AND THEREFORE IT IS | | | ENCROACHING INTO THE MINIMUM CONDITIONAL SETBACK | | | REQUIRED ALONG DIXIE HWAY. | | | 31. SATISFIED * PROPOSED PALMS AT THE ENTRACE ON DIXIE | | | HWAY SHALL BE REPLACED WITH LIVE OAKS TO MAINTAIN THE | | | SHADE CANOPY | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
06-15-2020 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
06-15-2020 |
Time |
10:49 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
06-12-2020 |
Time |
14:32 |
Sent To |
|
|
| Notes |
| 2020-06-12 17:39:13 | 501 S DIXIE HWAY - AC MARRIOTT COMMENTS RESUBMITTAL | | | 4-14-20 | | | COMMENTS ARE LISTED AS SATISFIED OR NOT SATISFIED. | | | ADDITIONAL NOTES ARE ADDED TO CLARIFY THE COMMENT. | | | SENTENCE AFTER * IS THE OLD COMMENT. | | | 1. SATISFIED-PLEASE PROVIDE A CURRENT SURVEY, NO MORE | | | THAN 1 YEAR OLD. PLEASE INCLUDE THE DIMENSION OF THE | | | EXISTING SIDEWALK IN SURVEY, AND IMPROVEMENTS ALONG | | | NORTH SIDE OF GARDENIA STREET. | | | 2. SATISFIED-PLEASE ADJUST THE SITE AREA IN SHEET A1.01 | | | TO REFLECT LOT SIZE AS INDICATED IN SURVEY. SITE IS | | | 32,522SF. PROJECT FACT SHEET ALSO HAS A DIFFERENT SITE | | | AREA (32,527SF). | | | 3. NOT SATISFIED - TO CLEARLY INDICATE THE AREAS | | | COUNTED AS FAR PLEASE PROVIDE A COLOR CODER FLOOR PLAN | | | FOR EACH LEVEL INDICATING AREAS COUNTED AND NOT | | | COUNTED. ANY FULLY ENCLOSED STORAGE AREAS SHALL BE | | | COUNTED AS FAR.*PLEASE PROVIDE A DETAILED ANALYSIS OF | | | THE AREAS IDENTIFIED AS GROSS BUILDING AREA (GBA) | | | ACCORDING TO THE DEFINITION IN SECTION 94-109 OF THE | | | ZLDR. | | | 4. NOT SATISFIED - PLEASE INDICATE PROPERTY LINES AND | | | MINIMUM REQUIRED SETBACK LINES IN ALL FLOOR PLANS AND | | | ELEVATIONS. | | | 5. NOT SATISFIED- PROPOSED CURB CUTS ARE 17' IN WIDTH. | | | PLEASE STUDY THE POSSIBILITY TO REDUCE THE WIDTH OF THE | | | CURB CUT TO AT LEAST 12' IN WIDTH EACH.*DROP-OFF CURB | | | CUT SHALL BE REDUCED TO A MAXIMUM 12 FEET IN WIDTH, | | | LESS IF POSSIBLE TO MINIMIZE THE PEDESTRIAN IMPACT. | | | 6. SATISFIED -PLEASE COORDINATE THE PROJECT DATA IN THE | | | DIFFERENT SHEETS. PROJECT FACT SHEET INDICATES 128 | | | HOTEL ROOMS AND DOES NOT MENTION ANY RESIDENTIAL UNIT. | | | SP-1 LIST 152 HOTEL ROOMS AND DOES NOT LIST ANY | | | RESIDENTIAL UNIT, BUT SHEET A1.05 LIST 128 HOTEL ROOMS | | | AND 4,084 SF APARTMENT. PLEASE PROVIDE A CONSOLIDATED | | | PROJECT DATA IN THE SITE PLAN SHEET. | | | 7. NOT SATISFIED- PARKING CALCULATION IN SITE PLAN | | | SHALL INCLUDE THE REQUIRED PARKING FOR PROPOSED RETAIL | | | AND MEETING AREAS.PLEASE INCLUDE CALCULATIONS FOR | | | REQUIRED BIKE PARKING AT 1/15 PARKING SPACES PROVIDED | | | (16 REQUIRED) + PUBLIC BIKE RACKS AT 1/100 LINEAR FEET | | | OF FRONTAGE (4 REQUIRED ON SIDEWALK).* PARKING | | | CALCULATION SHALL ACCOUNT FOR THE REQUIRED PARKING | | | ASSOCIATED WITH THE EXISTING MARRIOTT RESIDENCE INN (42 | | | PARKING SPACES). A RESTRICTIVE COVENANT SHALL BE | | | RECORDED ENSURING THE 42 SPACES ARE PROVIDED FOR THE | | | EXISTING MARRIOTT RESIDENCE INN. | | | 8. NOT SATISFIED- PLEASE INCLUDE A NOTE IN THE CIVIL | | | DRAWINGS STATING THAT THE SIDEWALK ELEVATION SHALL BE | | | MAINTAINED ACROSS THE CURB CUT.*SIDEWALK ELEVATION | | | SHALL BE MAINTAINED ACROSS CURB CUTS. PLEASE PROVIDE A | | | DETAIL SPECIFICALLY ADDRESSING THAT REQUIREMENT. | | | 9. NOT SATISFIED- PLEASE INCLUDE THE APPROVED | | | COSMOPOLITAN SITE PLAN WITH YOUR SITE PLAN TO ENSURE | | | THE PROPOSED STREET DESIGN AND ON-STREET PARKING WORKS. | | | ENGINEERING NEEDS TO CONFIRM ON-STREET PARKING ON BOTH | | | SIDES OF GARDENIA IS VIABLE. *SITE PLAN INDICATES THE | | | REMOVAL OF THE 8 EXISTING ON-STREET PARKING SPACES. IS | | | THE PROJECT RELOCATING THE EXISTING CURB? PLEASE | | | INDICATE HOW THE PROPOSED CURB RELOCATION AFFECTS THE | | | WEST SIDE OF THE PROJECT AND THE EXISTING SECTION. | | | CONSIDER THE NEW PROJECT CURRENTLY APPROVED ALONG THE | | | NORTH SIDE OF GARDENIA STREET. INCORPORATE THAT PROJECT | | | IN THE SITE PLAN FOR CONTEXT PURPOSES. | | | 10. SATISFIED- A PAYMENT FOR THE FOUR SPACES REMOVED | | | WILL BE REQUIRED. *IF ON-STREET PARKING IS REMOVED, | | | PROJECT SHALL BE RESPONSIBLE FOR THE PARKING METER | | | REMOVAL FEE. | | | 11. PARTIALLY SATISFIED- PLEASE PROVIDE ADDITIONAL | | | DETAILS ON THE PROPOSED FABRIC SAILS TO COVER GARAGE | | | AND INCLUDE A CALCULATION OF THE PERCENTAGE COVERED BY | | | THE PROPOSED STRUCTURE TO CONFIRM COMPLIANCE WITH 30% | | | COVERAGE. *EXPOSED PARKING DECK REQUIRES 10% OF GROUND | | | FLOOR PUBLIC OPEN SPACE. TWO PROPOSED OPEN SPACES AT | | | GROUND LEVEL DO NOT COMPLY WITH THE PUBLIC OPEN SPACE | | | REQUIREMENTS. MINIMUM SIZE IS 900SF, MINIMUM ACTIVE USE | | | ABUTMENT IS REQUIRED, AND IT SHALL BE OPEN TO THE SKY. | | | PLEASE SEE SEC 94-109 AND TABLE IV-7. | | | 12. SATISFIED -* REFLECTIVE GLASS IS NOT ALLOWED AT THE | | | GROUND LEVEL, IT DOES NOT COMPLY WITH TRANSPARENCY | | | REQUIREMENTS. | | | 13. SATISFIED - * PARKING ENTRANCE CEILING SHALL BE | | | FINISHED AT A MINIMUM DEPTH OF 20 FEET. UTILITIES SHALL | | | NOT BE EXPOSED. | | | 14. NOT SATISFIED- *VARIANCE REQUEST FOR THE SETBACK | | | ABOVE 3RD FLOOR PARKING REQUIRES DAC APPROVAL. | | | 15. NOT SATISFIED -* VARIANCE REQUEST REGARDING THE | | | AISLE WIDTH REQUIRES ENGINEERING REVIEW BEFORE IT CAN | | | BE PRESENTED TO DAC FOR APPROVAL.PLEASE PROVIDE | | | INFORMATION TO JUSTIFY THE REQUEST AND PROVE THAT | | | PARKNG CIRCULATION STILL FUNCTIONS. | | | 16. NOT SATISFIED- PLEASE EXPLAIN WHY THE PLANAR BREAK | | | REQUIREMENT CANNOT BE MET. | | | 17. NOT SATISFIED- PLEASE IDENTIFY OTHER ALTERNATIVES | | | TO PROVIDE THE REQUIRED DEPTH FOR THE PLANAR BREAK. IN | | | ADDITION, THE WEST ELEVATION DOES NOT COMPLY WITH THE | | | BLANK WALL REGULATION, AND SOUTH ELEVATION (FACADE | | | CLOSEST TO DIXIE) SEEMS NOT TO COMPLY WITH THE BLANK | | | WALL REGULATION EITHER. THE PORTION OF THE SOUTH | | | ELEVATION CLOSEST TO DIXIE HWAY IS HIGHLY VISIBLE FROM | | | THE STREET AND NEEDS TO BE TREATED AS A STREET FACADE, | | | NOT AS AN ALLEY FACADE. FENESTRATION CAN BE PROVIDED. | | | PLEASE PROVIDE INFORMATION TO CONFIRM COMPLIANCE WITH | | | TABLE IV-4 REGARDING ALL ELEMENTS LISTED. BLANK WALLS | | | ARE NOT ALLOWED. PROVIDE GRAPHIC INFORMATION TO CONFIRM | | | COMPLIANCE. | | | 18. SATISFIED PLEASE CLARIFY LOCATION OF PROPOSED | | | CANOPY OVER ALLEY. PROPOSED CANOPY OVER ALLEY REQUIRES | | | AN AERIAL EASEMENT FROM THE CITY. | | | 19. NOT SATISFIED- DUE TO THE VARIANCE REQUEST PROJECT | | | IS REQUIRED TO GO TO THE DAC FOR APPROVAL OF REQUESTED | | | VARIANCES. | | | 20. SATISFIED - PLEASE PROVIDE SECTIONS OF THE PROJECT. | | | 21. PARTIALLY SATISFIED- PLEASE PROVIDE CONTEXT | | | ELEVATIONS *PLEASE PROVIDE CONTEXT COLORED ELEVATIONS | | | INCLUDING CALL OUT MATERIALS, INCLUDING PICTURES OF | | | PROPOSED MATERIALS. | | | 22. SATISFIED -PLEASE EXPLAIN GARBAGE COLLECTION | | | OPERATION. | | | 23. SATISFIED- PEASE PROVIDE INFORMATION TO CONFIRM | | | COMPLIANCE WITH BIKE PARKING REQUIREMENTS ALONG THE | | | STREET FRONTAGE (1 SPACE/ 100 FEET OF FRONTAGE, AND | | | INSIDE THE PROJECT SITE (1 BIKE SPACE/15 SPACES | | | PROVIDED). | | | 24. PARTIALLY SATISFIED - PLEASE INCLUDE A NOT TO | | | CONFIRM THE POLE AND FIXTURE ARE COLOR BLACK. *PROJECT | | | IS REQUIRED TO PROVIDE LIGHTING ALONG STREET FRONTAGE | | | WITH MINIMUM 0.6 FOOTCANDLES. PLEASE PROVIDE | | | PHOTOMETRICS AND DETAILS OF REQUIRED STREET LIGHTING TO | | | FOLLOW CITY STANDARDS. | | | | | | ADDITIONAL COMMENTS TO RESUBMITTAL 4-14-20 | | | 25. PLEASE UPDATE PARKING STRIPING DETAIL TO REFLECT | | | CITY STANDARD. | | | 26. HANDICAP SPACES NEED TO MEET THE ADA REQUIREDMENTS | | | (12' IN WIDTH WITH A 5' ACCESS AISLE). | | | 27. PLEASE DIMENSIONED ALL PARKING SPACES. | | | 28. PLEASE INDICATE THE LOCATION OF ENTRANCE CANOPY IN | | | THE FLOOR PLAN. AN AERIAL EASEMENT WILL BE REQUIRED. | | | 29. DOORS OPENING TO THE SIDEWALK CANNOT ENCROACH INTO | | | THE SIDEWALK PATH OF TRAVEL AND SHALL BE RECESSED. | | | PROPOSED RETAIL ON GARDENIA SHALL HAVE A DOOR FROM THE | | | STREET. | | | 30. NEW EVENT SPACE ON 7TH FLOOR IS DOUBLE HEIGHT AND | | | THEREFORE IT IS ENCROACHING INTO THE MINIMUM | | | CONDITIONAL SETBACK REQUIRED ALONG DIXIE HWAY. | | | 31. PROPOSED PALMS AT THE ENTRACE ON DIXIE HWAY SHALL | | | BE REPLACED WITH LIVE OAKS TO MAINTAIN THE SHADE CANOPY | | | | | | RESUBMITTAL | | | PLEASE SUBMIT A RESPONSE LETTER ADDRESSING EACH OF THE | | | COMMENTS. IDENTIFY THE SHEETS WHERE THE COMMENT IS | | | ADDRESS. | | | PLEASE SUBMIT 1 LARGE SET MAXIMUM 24" BY 36", ONE SET | | | 11" BY 17" AND A DIGITAL COPY OF ALL THE DRAWINGS, | | | RESPONSE LETTER AND SUPPORT DOCUMENTATION. | | | PLEASE UTILIZE THE GUIDELINES FOR RESUBMITTAL. A | | | MEETING WITH STAFF IS RECOMMENDED TO DISCUSS THE | | | COMMENTS. | | | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA | | | APONTE AT 561-822-1439. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
11-13-2019 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
11-13-2019 |
Time |
11:49 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
11-13-2019 |
Time |
11:48 |
Sent To |
|
|
| Notes |
| 2019-11-13 12:34:11 | 501 S DIXIE HWAY - AC MARRIOTT COMMENTS PPRC 11/13/19 | | | | | | 1. PLEASE PROVIDE A CURRENT SURVEY, NO MORE THAN 1 YEAR | | | OLD. PLEASE INCLUDE THE DIMENSION OF THE EXISTING | | | SIDEWALK IN SURVEY, AND IMPROVEMENTS ALONG NORTH SIDE | | | OF GARDENIA STREET. | | | 2. PLEASE ADJUST THE SITE AREA IN SHEET A1.01 TO | | | REFLECT LOT SIZE AS INDICATED IN SURVEY. SITE IS | | | 32,522SF. PROJECT FACT SHEET ALSO HAS A DIFFERENT SITE | | | AREA (32,527SF). | | | 3. PLEASE PROVIDE A DETAILED ANALYSIS OF THE AREAS | | | IDENTIFIED AS GROSS BUILDING AREA (GBA) ACCORDING TO | | | THE DEFINITION IN SECTION 94-109 OF THE ZLDR. | | | 4. PLEASE INDICATE PROPERTY LINES AND MINIMUM REQUIRED | | | SETBACK LINES IN ALL FLOOR PLANS AND ELEVATIONS. | | | 5. DROP-OFF CURB CUT SHALL BE REDUCED TO A MAXIMUM 12 | | | FEET IN WIDTH, LESS IF POSSIBLE TO MINIMIZE THE | | | PEDESTRIAN IMPACT. | | | 6. PLEASE COORDINATE THE PROJECT DATA IN THE DIFFERENT | | | SHEETS. PROJECT FACT SHEET INDICATES 128 HOTEL ROOMS | | | AND DOES NOT MENTION ANY RESIDENTIAL UNIT. SP-1 LIST | | | 152 HOTEL ROOMS AND DOES NOT LIST ANY RESIDENTIAL UNIT, | | | BUT SHEET A1.05 LIST 128 HOTEL ROOMS AND 4,084 SF | | | APARTMENT. PLEASE PROVIDE A CONSOLIDATED PROJECT DATA | | | IN THE SITE PLAN SHEET. | | | 7. PARKING CALCULATION SHALL ACCOUNT FOR THE REQUIRED | | | PARKING ASSOCIATED WITH THE EXISTING MARRIOTT RESIDENCE | | | INN (42 PARKING SPACES). A RESTRICTIVE COVENANT SHALL | | | BE RECORDED ENSURING THE 42 SPACES ARE PROVIDED FOR THE | | | EXISTING MARRIOTT RESIDENCE INN. | | | 8. SIDEWALK ELEVATION SHALL BE MAINTAINED ACROSS CURB | | | CUTS. PLEASE PROVIDE A DETAIL SPECIFICALLY ADDRESSING | | | THAT REQUIREMENT. | | | 9. SITE PLAN INDICATES THE REMOVAL OF THE 8 EXISTING | | | ON-STREET PARKING SPACES. IS THE PROJECT RELOCATING THE | | | EXISTING CURB? PLEASE INDICATE HOW THE PROPOSED CURB | | | RELOCATION AFFECTS THE WEST SIDE OF THE PROJECT AND THE | | | EXISTING SECTION. CONSIDER THE NEW PROJECT CURRENTLY | | | APPROVED ALONG THE NORTH SIDE OF GARDENIA STREET. | | | INCORPORATE THAT PROJECT IN THE SITE PLAN FOR CONTEXT | | | PURPOSES. | | | 10. IF ON-STREET PARKING IS REMOVED, PROJECT SHALL BE | | | RESPONSIBLE FOR THE PARKING METER REMOVAL FEE. | | | 11. EXPOSED PARKING DECK REQUIRES 10% OF GROUND FLOOR | | | PUBLIC OPEN SPACE. TWO PROPOSED OPEN SPACES AT GROUND | | | LEVEL DO NOT COMPLY WITH THE PUBLIC OPEN SPACE | | | REQUIREMENTS. MINIMUM SIZE IS 900SF, MINIMUM ACTIVE USE | | | ABUTMENT IS REQUIRED, AND IT SHALL BE OPEN TO THE SKY. | | | PLEASE SEE SEC 94-109 AND TABLE IV-7. | | | 12. REFLECTIVE GLASS IS NOT ALLOWED AT THE GROUND | | | LEVEL, IT DOES NOT COMPLY WITH TRANSPARENCY | | | REQUIREMENTS. | | | 13. PARKING ENTRANCE CEILING SHALL BE FINISHED AT A | | | MINIMUM DEPTH OF 20 FEET. UTILITIES SHALL NOT BE | | | EXPOSED. | | | 14. VARIANCE REQUEST FOR THE SETBACK ABOVE 3RD FLOOR | | | PARKING REQUIRES DAC APPROVAL. | | | 15. VARIANCE REQUEST REGARDING THE AISLE WIDTH REQUIRES | | | ENGINEERING REVIEW BEFORE IT CAN BE PRESENTED TO DAC | | | FOR APPROVAL.PLEASE PROVIDE INFORMATION TO JUSTIFY THE | | | REQUEST AND PROVE THAT PARKNG CIRCULATION STILL | | | FUNCTIONS. | | | 16. PLEASE EXPLAIN WHY THE PLANAR BREAK REQUIREMENT | | | CANNOT BE MET. | | | 17. PLEASE PROVIDE INFORMATION TO CONFIRM COMPLIANCE | | | WITH TABLE IV-4 REGARDING ALL ELEMENTS LISTED. BLANK | | | WALL ARE NOT ALLOWED. PROVIDE GRAPHIC INFORMATION TO | | | CONFIRM COMPLIANCE. | | | 18. PLEASE CLARIFY LOCATION OF PROPOSED CANOPY OVER | | | ALLEY. PROPOSED CANOPY OVER ALLEY REQUIRES AN AERIAL | | | EASEMENT FROM THE CITY. | | | 19. DUE TO THE VARIANCE REQUEST PROJECT IS REQUIRED TO | | | GO TO THE DAC FOR APPROVAL OF REQUESTED VARIANCES. | | | 20. PLEASE PROVIDE SECTIONS OF THE PROJECT. | | | 21. PLEASE PROVIDE CONTEXT COLORED ELEVATIONS INCLUDING | | | CALL OUT MATERIALS, INCLUDING PICTURES OF PROPOSED | | | MATERIALS. | | | 22. PLEASE EXPLAIN GARBAGE COLLECTION OPERATION. | | | 23. PEASE PROVIDE INFORMATION TO CONFIRM COMPLIANCE | | | WITH BIKE PARKING REQUIREMENTS ALONG THE STREET | | | FRONTAGE (1 SPACE/ 100 FEET OF FRONTAGE, AND INSIDE THE | | | PROJECT SITE (1 BIKE SPACE/15 SPACES PROVIDED). | | | 24. PROJECT IS REQUIRED TO PROVIDE LIGHTING ALONG | | | STREET FRONTAGE WITH MINIMUM 0.6 FOOTCANDLES. PLEASE | | | PROVIDE PHOTOMETRICS AND DETAILS OF REQUIRED STREET | | | LIGHTING TO FOLLOW CITY STANDARDS. | | | | | | | | | | | | RESUBMITTAL | | | PLEASE SUBMIT A RESPONSE LETTER ADDRESSING EACH OF THE | | | COMMENTS. IDENTIFY THE SHEETS WHERE THE COMMENT IS | | | ADDRESS. | | | PLEASE SUBMIT 10 LARGE SETS MAXIMUM 24" BY 36", ONE SET | | | 11" BY 17" AND A DIGITAL COPY OF ALL THE DRAWINGS, | | | RESPONSE LETTER AND SUPPORT DOCUMENTATION. | | | PLEASE UTILIZE THE GUIDELINES FOR RESUBMITTAL. | | | |
|
|
| |
Print |
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |