| 2019-11-12 19:51:29 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. RENOVATION OF THE EXISTING BUILDING. AN ASBESTOS | | | SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT | | | REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH | | | COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963, | | | OR BY EMAIL: [email protected] | | | | | | 3. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 4. THE ADDITION TO THE EXISTING BUILDING IS COVERED BY | | | CHAPTER 11 OF THE FLORIDA EXISTING BUILDING CODE. THE | | | HEIGHT AND/OR AREA INCREASE DUE TO THE PROPOSED | | | ADDITION SHALL NOT INCREASE THE TOTAL BUILDING HEIGHT | | | AND/OR AREA BEYOND THAT ALLOWED UNDER THE APPLICABLE | | | PROVISIONS OF CHAPTER 5 OF THE FLORIDA BUILDING CODE | | | FOR THE TYPE OF CONSTRUCTION USED. | | | | | | 5. GREASE INTERCEPTOR. A GREASE INTERCEPTOR WILL BE | | | REQUIRED FOR THE COMMERCIAL KITCHEN. PLEASE CONTACT | | | JEFFREY ODOMS, UTILITIES O&M SUPERINTENDENT, PUBLIC | | | UTILITIES DEPARTMENT, FATS OILS AND GREASE DIVISION, AT | | | (561) 822-2172, OR BY EMAIL: [email protected] | | | | | | 6. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS, | | | GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND | | | OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS, | | | SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC. | | | | | | 7. CONTRACTOR VEHICLE PARKING. PROPERTY OWNER AND | | | CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING OF | | | CONTRACTOR VEHICLES TO MINIMIZE THE IMPACT ON ALL | | | NEIGHBORING PROPERTIES. | | | | | | 8. PROTECTION OF NEIGHBORING PROPERTY. PROPERTY OWNER | | | AND CONTRACTOR SHALL PROTECT ALL NEIGHBORING PROPERTY, | | | INCLUDING VEHICLES, FROM DAMAGE OR DIRT CAUSED BY THE | | | CONSTRUCTION, AND SHALL NOTIFY THE OCCUPANTS OF | | | NEIGHBORING PROPERTIES ABOUT ALL STAGES OF CONSTRUCTION | | | THAT MAY AFFECT THE USE OF THEIR PROPERTY. | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
3 |
Status |
F |
Date |
09-24-2021 |
|
|
Cont ID |
|
| Sent By |
RROSSANO |
Date |
09-24-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
09-24-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-09-24 08:25:02 | COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR, ENG. | | | SERVICES DEPT., 561-494-1098 [email protected] : | | | | | | 1. CONFIRM THAT A COMPLETED LOS ANALYSIS SUMMARY TABLE | | | HAS BEEN SUBMITTED DIRECTLY TO ENGINEERING (SHEET 33 OF | | | CITY OF WPB DEVELOPMENT APPLICATION). | | | 2. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY | | | SEWER ARE REQUIRED. | | | 3. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE | | | SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING | | | PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT | | | HIM AT 561-494-2262 OR [email protected] | | | 4. FOR FORMAL ENGINEERING SUBMITTAL , PLANS SHALL SHOW | | | PROPOSED LOCATIONS AND DIMENSIONS OF ALL WATER, | | | STORMWATER, AND SANITARY AND SEWER LINES, INCLUDING | | | STUBS TO EACH PROPERTY LINE FOR WATER AND SANITARY | | | SEWERS, THE MAKE AND MODEL OF ALL VALVES, METERS, AND | | | OTHERS DEVICES TO BE INSTALLED ON THE SYSTEM, CATCH | | | BASINS, CULVERTS, DITCHES INCLUDING GRADES, PIPES | | | SIZES, MATERIALS, ELEVATIONS, ASSUMPTIONS, | | | CALCULATIONS, INVERT ELEVATIONS FOR ALL INLETS AND | | | MANHOLES AND PROFILES OF SANITARY SEWER LINES. ALL | | | AVAILABLE ELEVATION SHALL BE SHOWN ON THE PROFILE VIEW. | | | DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN | | | VIEW FOR ALL SANITARY AND STORM SEWERS. ADDITIONALLY, | | | PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED | | | UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC, | | | ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION | | | FACILITIES LOCATED ON THE RIGHT-OF-WAY. | | | 5. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER | | | METER AND BACKFLOW PREVENTION. | | | 6. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE CALLOUT | | | DOMESTIC BACKFLOW PREVENTER AS RPPA AND FIRE BACKFLOW | | | PREVENTER AS DCDA. SPECIFY LEAD FREE DESIGN ON ALL | | | BACKFLOWS. | | | 7. FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND | | | NPDES NOI REQUIREMENTS WILL BE ENFORCED. | | | - AN NOI IS REQUIRED FOR PROJECTS THAT: | | | - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS | | | THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF | | | DEVELOPMENT OR SALE; AND | | | - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE | | | STATE OR TO SURFACE WATERS OF THE STATE THROUGH A | | | MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4). | | | - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF | | | CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION | | | THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL | | | SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT | | | OF THE 10-2 CERTIFICATION. IF THE ENGINEERING PLANS DO | | | NOT INCLUDE AN EROSION CONTROL PLAN, THEN THE | | | CONTRACTOR SHOULD SUBMIT ONE PRIOR TO RECEIVING THE | | | ENGINEERING PERMIT. | | | 8. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES | | | OF PROPOSED AND EXISTING WATER AND SEWER WITHIN RIGHT | | | OF WAY AND SHOW ANY CROSSINGS/CONFLICTS. | | | 9. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING | | | APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT | | | SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING | | | SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED | | | LEAD-FREE DESIGN. | | | 10. FOR FORMAL ENGINEERING SUBMITTAL, WHEN TRENCHING IN | | | IN CITY MAINTAINED ROADWAY AREAS ADD NOTE TO PROVIDE 50 | | | FT. PAVEMENT RESTORATION TRANSITION ON EACH SIDE OF | | | PROPOSED TRENCH PER CURRENT CITY OF WPB STANDARD DETAIL | | | GC-8. | | | 11. PLEASE RESPOND TO ALL COMMENTS IN WRITING AND | | | INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER | | | (Z-XXXXXXXX). | | | | | | COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE | | | SUPER., WPB PUBLIC UTILITIES, 561-494-2262 OR | | | [email protected]: | | | | | | -THERE ARE A COUPLE BIKE RACKS PROPOSED OVER PLUMBING | | | OR DRAIN PIPE. MAY MAKE MAINTENANCE OF PIPE MORE | | | DIFFICULT. | | | -WILL THE GYMNASIUM BUILDING GET POTABLE WATER FROM | | | PLUMBING CONNECTION TO EXISTING BUILDING, OR A NEW | | | METERED WATER SERVICE? | | | -FOR FORMAL ENGINEERING SUBMITTAL UPDATE WATER PLANS AS | | | FOLLOWS: CALLOUT DISTANCE BETWEEN UTILITY POLE AND | | | SEWER LATERAL NEAR SOUTHWEST CORNER OF PROPERTY, | | | CALLOUT DISTANCE BETWEEN 4 BY 4 FIRE TEE AND LIGHT | | | POLE, SHOW FIRE FLOW CALCULATIONS, LABEL PIPING BETWEEN | | | WATER MAIN AND DCDA AS DIP, ADD GATE VALVE UPSTREAM OF | | | DCDA BETWEEN SIDEWALK AND PROPERTY LINE AND LABEL AS | | | POINT OF SERVICE. | | | | | | -SEWER LATERALS IN OUR SERVICE AREA ARE TYPICALLY 6 | | | INCH MINIMUM. PLEASE REVIEW AND UPDATE AS NEEDED AT | | | FORMAL ENGINEERING SUBMITTAL. | | | | | | COMMENTS FROM MICHAEL TECHNOW, PROJECT ENGINEER, WPB | | | PUBLIC UTILITIES, 561-494-1047, [email protected] : | | | | | | -PLEASE SHOW PROFILE AT TAP AND POINT OF SERVICE. | | | -ADD NOTE THIS IS WITH LS #21 SERVICE BOUNDARY. | | | -ADD EXISTING DRY UTILITIES. | | | -CALL OUR DIMENSIONS FOR EASEMENT. | | | -SHOW DETAIL FOR DCDA (CITY?S) | | | -SHOW EXISTING VALVES (IF ANY). | | | -SHOW EXISTING SEWER LATERALS AND WATER SERVICES | | | CURRENTLY SERVING PROPERTY. IF NOT IN USE, CUT AND CAP | | | AT THE MAIN. | | | -CALL OUT TYPICAL UTILITY CROSSING WITH VERTICAL | | | CLEARANCE. | | | -MAKE NOTE ON MH ON 21ST ST. ?ADJUST TO FINISHED GRADE | | | AS REQUIRED? | | | -PROVIDE CCTV OF NEW SEWER LATERALS. | | | -WHAT IS THE DASHED LINE (CIRCLE ON 19TH ST)? | | | -SHOW EXISTING WATER/SEWER SERVICES ON 19TH ST. AND | | | PROPOSED IMPROVEMENTS. | | | -FOR THE 18? VCP SWM ADD NOTE TO REHAB AS REQUIRED. | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
F |
Date |
06-14-2021 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
06-14-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
06-14-2021 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-07-01 08:33:59 | PERVIOUS/IMPERVIOUS CALCULATIONS TO BE SHOWN ON | | | ENGINEERING PLANS. | | | PLEASE SHOW WATER (INCL. FIRE AND IRRIGATION) AND | | | SANITARY DEMANDS TO SHEET 4 OF SITE PLAN SUBMITTAL. | | | PLEASE ADD INLET PROTECTION (FILTER FABRIC) TO ALL | | | NEARBY DRAINAGE STRUCTURES. | | | PLEASE CONFIRM ALL CITY OF WPB STANDARD DETAILS ARE | | | MOST CURRENT VERSIONS. CONTACT JANICE TARBILL AT | | | [email protected] FOR CAD FORMAT VERSION. | | | PLEASE PROVIDE CCTV OF EXISTING SANITARY PIPE ON 19TH | | | ST. LABEL EXISTING PIPE MATERIAL AND SIZE. | | | PLEASE SHOW PAVEMENT RESTORATION (50 FT. EACH SIDE OF | | | TAP) AT SCALE PER CIT OF WPB STANDARD DETAIL GC-8. | | | | | | | | | COMMENTS PER MARK HURLEY FIELD CUSTOMER SERVICE | | | SUPERVISOR, CITY OF WEST PALM BEACH PUBLIC UTILITIES | | | 561-822-2262 [email protected] | | | | | | -ON WATER AND DEMO PLANS, SHOW ALL EXISTING AND | | | PROPOSED UTILITY INFRASTRUCTURE. APPEARS LARGE SEWER | | | MAIN ALONG WEST SIDE OF PROPERTY IS MISSING AS WELL AS | | | SEWER LATERAL ON NORTH SIDE OF PROPERTY FOR THE | | | EXISTING BUILDING. | | | | | | -SHOW AND LABEL EXISTING DOMESTIC METER AND BACKFLOW | | | ASSEMBLY ON NORTH SIDE OF PROPERTY WEST OF WEST | | | DRIVEWAY. | | | | | | -FOR FORMAL ENGINEERING SUBMITTAL: 1) PROVIDE SEPARATE | | | BLOWUP DETAIL OF AREA AROUND DCDA. 2) LABEL ALL | | | PROPOSED PIPE WITH SIZE AND MATERIAL TYPE. 3) ADD INV | | | ELEVATION INFO TO LABELS OF SANITARY MANHOLES ON 19TH | | | ST. 4) LABEL ALL EXISTING WATER AND SEWER MAINS WITH | | | PIPE SIZE AND MATERIAL TYPE. 5) ADD GATE VALVE UPSTREAM | | | OF DCDA BEFORE METER TAP SO FIRELINE CAN BE SHUT OFF | | | WITHOUT AFFECTING THE OTHER WATER METER. 6) ADD SIZE OF | | | PROPOSED BACKFLOW ASSEMBLIES TO LABELS. 7) LABEL | | | EXISTING WATER SERVICES WITH PIPE SIZE AND MATERIAL | | | TYPE. 8) SHOW ALL EXISTING WATER MAIN VALVES IN | | | STREETS. | | | | | | -SANITARY MANHOLE APPEARS TO BE MISSING FROM WATER PLAN | | | NEAR NW AREA OF PROPERTY. PLEASE ADD. | | | | | | -SEWER LATERAL SHOWS ALL WASTEWATER FLOWING THROUGH | | | GREASE TRAP. IS THAT CORRECT? | | | | | | -VERIFY WHAT EXISTING WATER PIPE AT PROPOSED LOCATION | | | OF GYMNASIUM FEEDS. ALSO ADD LABEL DESCRIBING WHAT IS | | | HAPPENING TO IT ON WATER AND DEMO PLANS. | | | | | | -LABEL THE EXISTING IRRIGATION WATER SERVICE. | | | | | | -ADD WATER DEMAND CALCULATIONS TO WATER PLAN. | | | | | | -WILL THE FIRELINE JUST FEED THE NEW BUILDING OR ALSO | | | THE EXISTING BUILDING? | | | | | | -REVIEW ANY PROPOSED TREES ON SIDES OF PROPERTY TO | | | ENSURE NO CONFLICTS WITH EXISTING AND PROPOSED WATER | | | SERVICES AND SEWER LATERALS. INCREASE CLEARANCE | | | DISTANCES AND ADD ROOT BARRIERS AS NEEDED. | | | | | | -SHOW AND LABEL FIRE HYDRANT NEAR NE AREA OF PROPERTY. | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
11-08-2019 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
11-08-2019 |
Time |
|
Rev Time |
3.00 |
| Received By |
rrossano |
Date |
11-08-2019 |
Time |
|
Sent To |
|
|
| Notes |
| 2019-11-08 10:36:23 | 1. PLEASE RESPOND IN WRITING TO ALL COMMENTS WITH Z | | | PERMIT NUMBER, PROJECT NAME AND ADDRESS. | | | 2. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS | | | OF ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES, | | | INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND | | | SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES, | | | METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE | | | SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING | | | GRADES, PIPES SIZES, MATERIALS, ELEVATIONS, | | | ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL | | | INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER | | | LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE | | | PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN | | | VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. | | | PLEASE SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT | | | MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL | | | EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT, | | | INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION & | | | TELECOMMUNICATION FACILITIES LOCATED ON THE | | | RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL | | | UTILITY CROSSINGS. | | | 3. CUT AND CAP UTILITIES NOT IN USE, AND REMOVE ANY | | | ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY | | | RIGHT OF WAY. | | | 4. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE | | | DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB | | | DEVELOPMENT APPLICATION). | | | 5. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND | | | PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM | | | AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE | | | PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER. | | | 6. SHOW VERTICAL DATUM AND DATUM CONVERSION INFORMATION | | | (NAVD 88 AND NGVD 29). | | | 7. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND | | | IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED | | | AREAS. | | | 8. PLEASE RELOCATE ONSITE CLEANOUTS CLOSER TO PROPERTY | | | LINE FOR PROPOSED SANITARY LATERALS. | | | 9. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE | | | SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING | | | PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT | | | HIM AT 561-494-2262 OR [email protected] | | | 10. PLEASE CHECK TO SEE IF FDEP FORMS ARE NEEDED. | | | 11. PLEASE CLEARLY LABEL CITY OF WPB POINTS OF SERVICE | | | FOR UTILITY CONNECTIONS. | | | 12. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE | | | ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER | | | METER AND BACKFLOW PREVENTION. INCLUDE EASEMENT | | | DEDICATION FOR WATER METER. | | | 13. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE CALLOUT | | | DOMESTIC BACKFLOW PREVENTER AS RPPA AND FIRE BACKFLOW | | | PREVENTER AS DCDA. SPECIFY LEAD FREE DESIGN ON ALL | | | BACKFLOWS. | | | 14. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES | | | OF WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS. | | | 15. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING | | | APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT | | | SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING | | | SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED | | | LEAD-FREE DESIGN. | | | 16. ON CIVIL PLANS COVER SHEET, PLEASE UPDATE MAYOR?S | | | NAME, ADD PROJECT ADDRESS. | | | 17. CIVIL PLANS ARE FUZZY, ELEVATIONS ARE DIFFICULT TO | | | READ. | | | | | | SHEET C-04: | | | - PLEASE LABEL ROAD (EAST PARKWAY?). | | | - CLEARLY INDICATE RIGHTS OF WAY. | | | - ADD PAVEMENT RESTORATION NOTE PER CITY OF WPB | | | STANDARD DETAIL GC-9; CALLOUT LIMITS OF PAVEMENT | | | RESTORATION. | | | - SHOW LATERAL CLEARANCE BETWEEN EXISTING ONSITE | | | DRAINAGE LINE AND PROPOSED WATER LINE PER CITY OF WPB | | | STANDARD DETAIL GN-2. | | | - CLEARLY SHOW ONSITE WATER LAYOUT, SPECIFY MATERIAL, | | | SIZES ETC. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | | | | RICK ROSSANO, PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | DIRECT: (561) 494-1098 | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
06-22-2021 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
06-22-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
06-22-2021 |
Time |
11:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
11-06-2019 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
11-06-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
11-06-2019 |
Time |
13:03 |
Sent To |
|
|
| Notes |
| 2019-11-06 13:06:44 | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, | | | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM | | | BEACH FIRE RESCUE. | | | | | | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE | | | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. | | | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS | | | ARE SUBMITTED FOR PERMIT. | | | | | | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE | | | PROPOSED PROJECT. | | | | | | 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY | | | WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE | | | PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A | | | PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED | | | TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN | | | STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY | | | MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER | | | PROTECTION. | | | | | | 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY | | | IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING | | | ALL CONSTRUCTION ACTIVITIES. | | | | | | 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM | | | ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION. | | | ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND | | | AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT | | | WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS. | | | | | | 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE | | | REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE | | | ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS. | | | | | | 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH | | | THE 6TH EDITION OF THE FLORIDA FIRE PREVENTION CODE, | | | INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES. | | | | | | 6. FOR PLAN REVIEW SUBMITTAL, PLEASE INCLUDE THE | | | OCCUPANCY TYPE, PER THE FLORIDA FIRE PREVENTION CODE, | | | AND WHETHER IT IS MIXED OR SEPARATED OCCUPANCY. | | | | | | 7. FOR PLAN REVIEW SUBMITTAL, PLEASE ENSURE THAT A FIRE | | | LOAD CALCULATION IS INCLUDED AND THAT ADEQUATE WATER | | | SUPPLY IS EXISTING OR WILL BE PROVIDED. | | | | | | 8. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED | | | ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF | | | FIRE PREVENTION. | | | | | | ALL NEW FIRE HYDRANTS AND FDC?S PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLOSELY COORDINATED WITH THE | | | BUREAU OF FIRE PREVENTION. PROPOSED FIRE HYDRANTS AND | | | FDC?S SHOULD BE LOCATED ON THE SAME SIDE OF THE STREET | | | OR ACCESS ROADWAY TO ALLOW FREE ACCESS FOR OTHER | | | ARRIVING EMERGENCY VEHICLES. | | | | | | 9. THE GYM IS AN ASSEMBLY OCCUPANCY AND BASED ON THE | | | OCCUPANCY LOAD A FIRE SPRINKLER SYSTEM MAY BE REQUIRED. | | | PER NFPA 101, CH 12 - 12.3.5.2 ANY BUILDING CONTAINING | | | ONE OR MORE ASSEMBLY OCCUPANCIES WHERE THE AGGREGATE | | | OCCUPANT LOAD OF THE ASSEMBLY OCCUPANCIES EXCEEDS 300 | | | SHALL BE PROTECTED BY AN APPROVED, SUPERVISED AUTOMATIC | | | SPRINKLER SYSTEM IN ACCORDANCE WITH SECTION 9.7 AS | | | FOLLOWS (SEE ALSO 12.1.6, 12.2.6, 12.3.2, AND 12.3.6): | | | (1) THROUGHOUT THE STORY CONTAINING THE ASSEMBLY | | | OCCUPANCY | | | (2) THROUGHOUT ALL STORIES BELOW THE STORY CONTAINING | | | THE ASSEMBLY OCCUPANCY | | | (3) IN THE CASE OF AN ASSEMBLY OCCUPANCY LOCATED BELOW | | | THE LEVEL OF EXIT DISCHARGE, THROUGHOUT ALL STORIES | | | INTERVENING BETWEEN THAT STORY AND THE LEVEL OF EXIT | | | DISCHARGE, INCLUDING THE LEVEL OF EXIT DISCHARGE | | | | | | PROVIDE FOR A FIRE SPRINKLER AND/OR FIRE ALARM PER THE | | | APPLICABLE OCCUPANCY CODE. FOR ANY LIFE SAFETY | | | ENGINEERED SYSTEM, I.E FIRE SPRINKLER AND FIRE ALARM, | | | ENSURE THEY COMPLY WITH THE REQUIREMENTS OF FS 61G AND | | | SUBMITTED WITH THE MASTER PLAN. | | | | | | 10. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL | | | BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL | | | DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS, | | | EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A | | | PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE | | | SAFETY FEATURES AND EQUIPMENT. | | | | | | 11. IT IS HIGHLY RECOMMENDED (REQUIRED WITH FIRE | | | SPRINKLER SYSTEM) THAT A KNOX BOX WITH KEYS FOR ENTRY | | | DOOR LOCKS BE PROVIDED FOR 24 HOUR EMERGENCY ACCESS. | | | | | | 12. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT | | | DOES NOT CONSTITUTE ITS FINAL REVIEW OR APPROVAL. | | | | | | 13. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING | | | PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH | | | THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
3 |
Status |
P |
Date |
10-01-2021 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
10-01-2021 |
Time |
14:26 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
10-01-2021 |
Time |
14:26 |
Sent To |
|
|
| Notes |
| 2021-10-01 14:28:49 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 | | | PROJECT: COLEMAN PARK COMMUNITY CENTER Z19090032 | | | OCTOBER 1, 2021 | | | | | | ANDREW BURNETT LANDSCAPE PLANNER 6/17/21 | | | 561-822-1562 | | | | | | 1. SATISFIED. PROVIDE A TREE SURVEY, TREE DISPOSITION | | | PLAN AND CHART FOR EXISTING TREES IN THE AFFECTED AREA. | | | A. MULTIPLE LIVE OAK TREES LISTED AS REMOVAL ON TREE | | | SURVEY. | | | PER CODE 94-448 D. 3. A-C TREE RELOCATION AND | | | REPLACEMENT. THE APPLICANT FOR A TREE REMOVAL PERMIT | | | SHALL BE REQUIRED TO RELOCATE OR REPLACE TREES TO BE | | | REMOVED OR PROVIDE PAYMENT IN LIEU THEREOF INTO THE | | | LANDSCAPE TRUST ACCOUNT FOR TREES THAT CANNOT BE | | | RELOCATED, REPLACED OR INSTALLED DUE TO PREEXISTING | | | SITE DEVELOPMENT CONSTRAINTS AS DETERMINED BY THE | | | PLANNING AND ZONING ADMINISTRATOR. NATIVE TREES AND | | | PALMS IN GOOD CONDITION MUST BE PRESERVED ON SITE OR | | | RELOCATED. RELOCATED TREES SHALL BE INSTALLED IN A | | | SOUND AND SKILLED MANNER ACCORDING TO ACCEPTED PLANTING | | | PRACTICES AND SHALL BE IN ACCORDANCE WITH THE | | | FOLLOWING: | | | A. IF THE TREE IS TRANSPLANTED, IT SHALL BE MOVED BY | | | THE PROPERTY OWNER IN ACCORDANCE WITH THE NATIONAL | | | ARBORIST ASSOCIATION STANDARDS OR OTHER PROFESSIONAL | | | ARBORIST ASSOCIATION, CURRENTLY THE ANSI A-300 | | | STANDARDS, TO ANOTHER LOCATION WITHIN THE CITY AND | | | MAINTAINED BY THE NEW PROPERTY OWNER. | | | B. IF A TREE ON PUBLIC PROPERTY IS WILLFULLY DESTROYED | | | BY ANYONE EXCEPT THE CITY FORESTER/ARBORIST, THE TREE | | | MUST BE SUBSTITUTED WITH AN EQUIVALENT REPLACEMENT THAT | | | IS APPROVED BY THE FORESTER/ARBORIST OR DESIGNER ON THE | | | SITE FROM WHICH THE DESTROYED TREE WAS REMOVED. | | | C. NO PERMIT SHALL BE REQUIRED FOR THE REMOVAL OF TREES | | | THAT ARE DEAD, SEVERELY DISEASED, ARE INVASIVE EXOTIC | | | SPECIES, OR ARE DESTROYED BY NATURAL CAUSES. THIS | | | INCLUDES TREES THAT ARE PLANTED IN A CERTIFIED NURSERY | | | OR BOTANICAL GARDEN. | | | | | | | | | 2. SATISFIED. PROVIDE A LANDSCAPE PLAN MEETING CITY | | | CODE AND POLICY REQUIREMENTS. FOR ALL CITY PROJECT USE | | | OF LOW MAINTENANCE NATIVE PLANTS IS PREFERRED BY CITY | | | POLICY. | | | CONDITIONS OF APPROVAL | | | | | | 3. SATISFIED. LANDSCAPE HEDGES NEED TO BE PLANTED TO | | | SCREEN MECHANICAL EQUIPMENT, AC UNITS, FPL BOX WATER | | | BACKFLOWS , WATER METERS. ON 3 SIDES WITH THE EXCEPTION | | | OF THE ACCESS DOOR SIDE. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | | | | 2. PRIOR TO SUBMITTAL OF THE TREE ALTERATION PERMIT AND | | | THE LANDSCAPE PERMIT, THE APPLICANT SHALL MAKE THE | | | FOLLOWING CORRECTIONS TO THE EXISTING TREE PLAN SHEET 1 | | | OF 2 AND THE LANDSCAPE PLAN: | | | ? SABAL PALMS ARE CATEGORY 3, SO MITIGATION CREDIT IS | | | 100 SQ FT. EACH ON THE MITIGATION CHART, NOT 200. | | | ? WITH THIS CORRECTION, | | | ADD TREE TREES OR PALMS TO THE LANDSCAPE PLAN FOR | | | CANOPY CREDITS TO COVER THE 653 SQ FT MITIGATION DUE. | | | | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
F |
Date |
06-17-2021 |
|
|
Cont ID |
|
| Sent By |
aburnett |
Date |
06-17-2021 |
Time |
16:17 |
Rev Time |
0.00 |
| Received By |
aburnett |
Date |
06-17-2021 |
Time |
16:17 |
Sent To |
|
|
| Notes |
| 2021-06-17 16:19:29 | ANDREW BURNETT LANDSCAPE PLANNER 6/17/21 | | | 561-822-1562 | | | | | | 1. PROVIDE A TREE SURVEY, TREE DISPOSITION PLAN AND | | | CHART FOR EXISTING TREES IN THE AFFECTED AREA. | | | | | | PARTIALLY SATISFIED | | | A. MULTIPLE LIVE OAK TREES LISTED AS REMOVAL ON TREE | | | SURVEY. | | | PER CODE 94-448 D. 3. A-C TREE RELOCATION AND | | | REPLACEMENT. THE APPLICANT FOR A TREE REMOVAL PERMIT | | | SHALL BE REQUIRED TO RELOCATE OR REPLACE TREES TO BE | | | REMOVED OR PROVIDE PAYMENT IN LIEU THEREOF INTO THE | | | LANDSCAPE TRUST ACCOUNT FOR TREES THAT CANNOT BE | | | RELOCATED, REPLACED OR INSTALLED DUE TO PREEXISTING | | | SITE DEVELOPMENT CONSTRAINTS AS DETERMINED BY THE | | | PLANNING AND ZONING ADMINISTRATOR. NATIVE TREES AND | | | PALMS IN GOOD CONDITION MUST BE PRESERVED ON SITE OR | | | RELOCATED. RELOCATED TREES SHALL BE INSTALLED IN A | | | SOUND AND SKILLED MANNER ACCORDING TO ACCEPTED PLANTING | | | PRACTICES AND SHALL BE IN ACCORDANCE WITH THE | | | FOLLOWING: | | | A. IF THE TREE IS TRANSPLANTED, IT SHALL BE MOVED BY | | | THE PROPERTY OWNER IN ACCORDANCE WITH THE NATIONAL | | | ARBORIST ASSOCIATION STANDARDS OR OTHER PROFESSIONAL | | | ARBORIST ASSOCIATION, CURRENTLY THE ANSI A-300 | | | STANDARDS, TO ANOTHER LOCATION WITHIN THE CITY AND | | | MAINTAINED BY THE NEW PROPERTY OWNER. | | | B. IF A TREE ON PUBLIC PROPERTY IS WILLFULLY DESTROYED | | | BY ANYONE EXCEPT THE CITY FORESTER/ARBORIST, THE TREE | | | MUST BE SUBSTITUTED WITH AN EQUIVALENT REPLACEMENT THAT | | | IS APPROVED BY THE FORESTER/ARBORIST OR DESIGNER ON THE | | | SITE FROM WHICH THE DESTROYED TREE WAS REMOVED. | | | C. NO PERMIT SHALL BE REQUIRED FOR THE REMOVAL OF TREES | | | THAT ARE DEAD, SEVERELY DISEASED, ARE INVASIVE EXOTIC | | | SPECIES, OR ARE DESTROYED BY NATURAL CAUSES. THIS | | | INCLUDES TREES THAT ARE PLANTED IN A CERTIFIED NURSERY | | | OR BOTANICAL GARDEN. | | | | | | | | | 2. PROVIDE A LANDSCAPE PLAN MEETING CITY CODE AND | | | POLICY REQUIREMENTS. FOR ALL CITY PROJECT USE OF LOW | | | MAINTENANCE NATIVE PLANTS IS PREFERRED BY CITY POLICY. | | | A. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED, AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENTS, PLANNING DIVISION. | | | PARTIALLY SATISFIED: TREE ALTERATION PERMIT NEEDED | | | | | | 3. LANDSCAPE HEDGES NEED TO BE PLANTED TO SCREEN | | | MECHANICAL EQUIPMENT, AC UNITS , FPL BOX WATER | | | BACKFLOWS , WATER METERS. ON 3 SIDES WITH THE EXCEPTION | | | OF THE ACCESS DOOR SIDE. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
11-08-2019 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
11-08-2019 |
Time |
10:38 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
11-08-2019 |
Time |
10:38 |
Sent To |
|
|
| Notes |
| 2019-11-08 10:38:41 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 | | | PROJECT: COLEMAN PARK COMMUNITY CENTER Z19090032 | | | NOVEMBER 8, 2019 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | | | | 1. PROVIDE A TREE SURVEY, TREE DISPOSITION PLAN AND | | | CHART FOR EXISTING TREES IN THE AFFECTED AREA. | | | | | | 2. PROVIDE A LANDSCAPE PLAN MEETING CITY CODE AND | | | POLICY REQUIREMENTS. | | | FOR ALL CITY PROJECTS USE OF LOW MAINTENANCE NATIVE | | | PLANTS IS PREFERRED BY CITY POLICY. | | | | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
2 |
Status |
P |
Date |
06-14-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
06-14-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
06-14-2023 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-06-14 07:39:57 | NO FURTHER COMMENTS FROM DEPT. OF PUBLIC WORKS | | | | | | MATT HEJAZI | | | [email protected] | | | |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
F |
Date |
11-06-2019 |
|
|
Cont ID |
|
| Sent By |
|
Date |
11-06-2019 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
11-06-2019 |
Time |
|
Sent To |
|
|
| Notes |
| 2019-11-06 14:29:57 | - PLEASE PROVIDE AUTO TURN FOR THE SANITATION SERVICE. | | | - FOR A FREESTANDING SITE DUMPSTER ENCLOSURE, THE | | | ENCLOSURE SHALL COMPLY WITH THE LATEST REVISION OF CITY | | | OF WEST PALM BEACH GENERAL CONSTRUCTION-GARBAGE | | | ENCLOSURE STANDARD, CG-8. | | | | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
11-13-2019 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
11-13-2019 |
Time |
09:39 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
11-13-2019 |
Time |
09:39 |
Sent To |
|
|
| Notes |
| 2019-11-13 09:39:00 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT | | | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT | | | | | | HTTPS://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FO | | | RMS,-PERMITS-APPLICATIONS | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. OBTAIN INVERT ELEVATIONS OF EXISTING SANITARY AND | | | DRAINAGE STRUCTURES. | | | | | | 2. SHOW MILL AND RESURFACING LIMITS FOR TRENCH CUTS | | | WITHIN THE RIGHT-OF-WAY. SEE CITY DETAILS. | | | | | | 3. CAN SEWER LATERAL CONNECTION BE MADE WITHOUT | | | INSTALLING A CONFLICT STRUCTURE WITH THE DRAINAGE PIPE. | | | | | | 4. PROVIDE CCTV OF DRAINAGE SYSTEM ON 19TH STREET WEST | | | OF EAST PARKWAY AND ON EAST PARKWAY FROM 19TH STREET TO | | | THE MANHOLE NORTH OF 19TH STREET. | | | | | | 5. DRAINAGE SYSTEM TO BE DESIGN PER SFWMD ERP CRITERIA. | | | | | | 6. LABEL PROPOSED PIPE SIZES AND MATERIAL. MINIMUM 15" | | | RCP PIPE TO BE USED WITHIN THE RIGHT-OF-WAY. | | | | | | 7. LABEL VERTICAL DATUM AND PROVIDE CONVERSION EQUATION | | | TO NGVD 1929. | | | | | | 8. LAYOUT UTILITIES TO AVOID EXISTING TREES IF | | | POSSIBLE. | | | | | | 9. LABEL THE EXISTING DRAINAGE PIPE SIZE FROM THE ROUND | | | CONCRETE PLAY AREA. | | | | | | 10. PROVIDE EXFILTRATION TRENCH DETAIL WITH DIMENSIONS. | | | | | | 11. ASPHALT MODIFICATION NEXT TO A CURB RAMP WILL | | | REQUIRE THE CURB RAMP TO BE CONSTRUCTED TO CURRENT | | | STANDARDS. | | | | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY | | | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. | | | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS | | | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE | | | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS | | | | | | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED | | | WITH THE ENGINEERING PERMIT APPLICATION. | | | | | | 3. PROVIDE A COPY OF THE SFWMD ERP PRIOR TO STARTING | | | CONSTRUCTION. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
3 |
Status |
P |
Date |
09-24-2021 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
09-24-2021 |
Time |
07:43 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
F |
Date |
06-17-2021 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
06-17-2021 |
Time |
07:58 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-06-17 08:18:40 | 1. NO LEGAL DESCRIPTION ON SURVEY. | | | 2. BEARING BASE IS MISSING. | | | 3. PROPERTY CORNERS ARE NOT IDENTIFIED. | | | 4. PARENT BENCHMARK NOT IDENTIFIED. | | | 5. ADD CONVERSION TO NGVD-29. | | | 6. 19TH STREET IS LABELED AS 19+TH. | | | 7. 0.6' CURB IS MISSPELLED. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
11-13-2019 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
11-13-2019 |
Time |
08:12 |
Rev Time |
|
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2019-11-13 08:23:32 | 1. SURVEY AND ENGINEERING PLANS ARE ALMOST ILLEGIBLE. | | | 2. SURVEY NEEDS TO BE SIGNED AND SEALED AS A SPECIFIC | | | PURPOSE SURVEY. | | | 3. ALL AS-BUILT ELEVATIONS NEED TO BE VERIFIED BY | | | SURVEY, NOT SHOWN AS PER CITY RECORDS. | | | 4. SHOW RELOCATION OF HOSE BIBS. | | | 5. PAVEMENT REPAIR DOES NOT MEET CITY STANDARD. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
3 |
Status |
P |
Date |
09-24-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
09-24-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-09-24 17:57:53 | NO FURTHER COMMENTS | | | | | | 1. SATISFIED. PROVIDE A TRAFFIC STATEMENT. | | | 2. SATISFIED. INCLUDE PARKING CALCULATIONS ON THE SITE | | | DATA TABLE. | | | 3. SATISFIED. CLARIFY HOW PARKING IS HANDLED FOR | | | PROGRAMMED EVENTS, IF ANY. | | | 4. SATISFIED. INCLUDE BICYCLE PARKING ON THE SITE PLAN. | | | CONSIDER PROVIDING ADDITIONAL BICYCLE PARKING SPACES | | | BEYOND CODE REQUIREMENTS. | | | 5. SATISFIED. REPAVE 19TH STREET AND EAST PARKWAY AFTER | | | UTILITY TIE-IN. | | | 6. SATISFIED. PROVIDE PEDESTRIAN CONNECTION TO THE | | | PROPOSED GYMNASIUM. | | | 7. SATISFIED. PROVIDE CROSSWALK AT THE EAST | | | PARKWAY/20TH STREET INTERSECTION, ACROSS EAST PARKWAY | | | AT 21ST STREET AND 19TH STREET. | | | 8. SATISFIED. CROSSWALK ACROSS EAST PARKWAY MUST BE | | | PERPENDICULAR. ADD ANOTHER CROSSWALK ON THE NORTHERN | | | SIDE. CLOSE EXISTING CENTRAL RAMP, INSTALL TWO NEW | | | RAMPS AT THE CORRESPONDING CROSSWALK LOCATION | | | 9. SATISFIED. PLEASE SHOW CURBS AND CURB-CUTS ON BOTH | | | SIDES OF STREET SURROUNDING THE SITE. | | | 10. SATISFIED. PLEASE SHOW RIGHT-OF-WAY WIDTHS AND | | | STREET WIDTHS. | | | 11. SATISFIED. PROVIDE PHOTOMETRICS FOR THE SITE. | | | 12. SATISFIED. PLEASE VERIFY IF THERE ARE SUFFICIENT | | | ON-STREET LIGHTINGS SURROUNDING THE SITE AS MOST | | | VISITORS ARE EXPECTED TO PARK ON-STREET. | | | 13. SATISFIED. PLEASE VERIFY ALL EXISTING UTILITIES ARE | | | ACCOMMODATED AS IT APPEARS THE PROPOSED BUILDING IS | | | DIRECTLY ON TOP OF EXISTING UTILITIES. | | | 14. SATISFIED. PLEASE VERIFY ALL IRRIGATION NEEDS ARE | | | PROPERLY ADDRESSED. | | | 15. SATISFIED. PLEASE VERIFY ALL DRAINAGE NEEDS ON | | | ROADWAYS ALONG THE SITE FRONTAGE ARE PROPERLY | | | ADDRESSED. | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
2 |
Status |
F |
Date |
06-22-2021 |
|
|
Cont ID |
|
| Sent By |
|
Date |
06-22-2021 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2021-06-22 18:44:33 | 1. SATISFIED. PROVIDE A TRAFFIC STATEMENT. | | | 2. SATISFIED. INCLUDE PARKING CALCULATIONS ON THE SITE | | | DATA TABLE. | | | 3. SATISFIED. CLARIFY HOW PARKING IS HANDLED FOR | | | PROGRAMMED EVENTS, IF ANY. | | | 4. SATISFIED. INCLUDE BICYCLE PARKING ON THE SITE PLAN. | | | CONSIDER PROVIDING ADDITIONAL BICYCLE PARKING SPACES | | | BEYOND CODE REQUIREMENTS. | | | 5. SATISFIED. REPAVE 19TH STREET AND EAST PARKWAY AFTER | | | UTILITY TIE-IN. | | | 6. SATISFIED. PROVIDE PEDESTRIAN CONNECTION TO THE | | | PROPOSED GYMNASIUM. | | | 7. PARTIALLY SATISFIED. PROVIDE CROSSWALK AT THE EAST | | | PARKWAY/20TH STREET INTERSECTION, ACROSS EAST PARKWAY | | | AT 21ST STREET AND 19TH STREET. | | | 8. CROSSWALK ACROSS EAST PARKWAY MUST BE PERPENDICULAR. | | | ADD ANOTHER CROSSWALK ON THE NORTHERN SIDE. CLOSE | | | EXISTING CENTRAL RAMP, INSTALL TWO NEW RAMPS AT THE | | | CORRESPONDING CROSSWALK LOCATION | | | 9. NOT SATISFIED. PLEASE SHOW CURBS AND CURB-CUTS ON | | | BOTH SIDES OF STREET SURROUNDING THE SITE. | | | 10. SATISFIED. PLEASE SHOW RIGHT-OF-WAY WIDTHS AND | | | STREET WIDTHS. | | | 11. SATISFIED. PROVIDE PHOTOMETRICS FOR THE SITE. | | | 12. SATISFIED. PLEASE VERIFY IF THERE ARE SUFFICIENT | | | ON-STREET LIGHTINGS SURROUNDING THE SITE AS MOST | | | VISITORS ARE EXPECTED TO PARK ON-STREET. | | | 13. SATISFIED. PLEASE VERIFY ALL EXISTING UTILITIES ARE | | | ACCOMMODATED AS IT APPEARS THE PROPOSED BUILDING IS | | | DIRECTLY ON TOP OF EXISTING UTILITIES. | | | 14. SATISFIED. PLEASE VERIFY ALL IRRIGATION NEEDS ARE | | | PROPERLY ADDRESSED. | | | 15. SATISFIED. PLEASE VERIFY ALL DRAINAGE NEEDS ON | | | ROADWAYS ALONG THE SITE FRONTAGE ARE PROPERLY | | | ADDRESSED. | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
11-12-2019 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2019-11-12 14:48:04 | 1. PROVIDE A TRAFFIC STATEMENT. | | | 2. INCLUDE PARKING CALCULATIONS ON THE SITE DATA TABLE. | | | 3. CLARIFY HOW PARKING IS HANDLED FOR PROGRAMMED | | | EVENTS, IF ANY. | | | 4. INCLUDE BICYCLE PARKING ON THE SITE PLAN. CONSIDER | | | PROVIDING ADDITIONAL BICYCLE PARKING SPACES BEYOND CODE | | | REQUIREMENTS. | | | 5. REPAVE 19TH STREET AND EAST PARKWAY AFTER UTILITY | | | TIE-IN. | | | 6. PROVIDE PEDESTRIAN CONNECTION TO THE PROPOSED | | | GYMNASIUM. | | | 7. PROVIDE CROSSWALK AT THE EAST PARKWAY/20TH STREET | | | INTERSECTION, ACROSS EAST PARKWAY AT 21ST STREET AND | | | 19TH STREET, AND AT MIDBLOCK LOCATIONS ACROSS 19TH | | | STREET. | | | 8. PLEASE SHOW CURBS AND CURB-CUTS ON BOTH SIDES OF | | | STREET SURROUNDING THE SITE. | | | 9. PLEASE SHOW RIGHT-OF-WAY WIDTHS AND STREET WIDTHS. | | | 10. PROVIDE PHOTOMETRICS FOR THE SITE. | | | 11. PLEASE VERIFY IF THERE ARE SUFFICIENT ON-STREET | | | LIGHTINGS SURROUNDING THE SITE AS MOST VISITORS ARE | | | EXPECTED TO PARK ON-STREET. | | | 12. PLEASE VERIFY ALL EXISTING UTILITIES ARE | | | ACCOMMODATED AS IT APPEARS THE PROPOSED BUILDING IS | | | DIRECTLY ON TOP OF EXISTING UTILITIES. | | | 13. PLEASE VERIFY ALL IRRIGATION NEEDS ARE PROPERLY | | | ADDRESSED. | | | 14. PLEASE VERIFY ALL DRAINAGE NEEDS ON ROADWAYS ALONG | | | THE SITE FRONTAGE ARE PROPERLY ADDRESSED. | | | | | | SHING TSOI | | | CITY IN-HOUSE TRAFFIC CONSULTANT | | | 561-494-1141 | | | [email protected] | | | (IN-HOUSE ON TUESDAYS AND WEDNESDAYS) | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
10-01-2021 |
|
|
Cont ID |
|
| Sent By |
jroach |
Date |
10-01-2021 |
Time |
08:49 |
Rev Time |
0.00 |
| Received By |
jroach |
Date |
10-01-2021 |
Time |
08:49 |
Sent To |
|
|
| Notes |
| 2021-10-01 08:59:58 | PLANS AND PLATS REVIEW COMMITTEE (PPRC) ZONING REVIEW | | | ________________________________________ | | | | | | DATE OF REVIEW: 10.01.2021 | | | PROJECT NO.: Z19090032 | | | CASE NO.: FSPR 19-06 | | | ________________________________________ | | | | | | REVIEW STATUS: PASSED WITH PROVISOS | | | ________________________________________ | | | | | | THIS REVIEW HAS BEEN PASSED SUBJECT TO THE FOLLOWING | | | PROVISOS: | | | | | | 1. PRIOR TO ISSUANCE OF A BUILDING PERMIT: | | | | | | 1.1. UTILITY LETTERS SHALL BE PROVIDED FROM ALL | | | UTILITY COMPANIES (SEE PAGES 6-7 OF THE DEVELOPMENT | | | APPLICATION). | | | | | | 1.2. PER SEC. 94-233(C)(4) OF THE CITY'S ZLDRS, THE | | | MAXIMUM FAR ALLOWED IS 0.2 - THE SITE DATA TABLE | | | INDICATES ONLY 0.75 IS PERMITTED. PLEASE ADJUST | | | ACCORDINGLY. | | | | | | 1.3. PER SEC 94-233(B) OF THE CITY'S ZLDRS, THE | | | MAXIMUM BUILDING HEIGHT PERMITTED IS 40 FEET - THE SITE | | | DATA TABLE INDICATES 30 FEET. PLEASE ADJUST | | | ACCORDINGLY. | | | | | | 2. THE PROJECT SHALL COMPLY WITH SEC. 255.2575, FLORIDA | | | STATUTES, REGARDING CONSTRUCTION OF AN ENERGY-EFFICIENT | | | AND SUSTAINABLE BUILDING. | | | | | | 3. THE A/C EQUIPMENT PADS/AREA TO THE WEST OF THE | | | PROPOSED GYMNASIUM NEEDS TO BE SCREENED FROM VIEW WITH | | | A WALL OR OPAQUE FENCE CONSISTING OF BRICK, DECORATIVE | | | CONCRETE, OTHER DECORATIVE MASONRY, OR COMPARABLY | | | DURABLE WOOD/STEEL. CHAIN LINK FENCING WITH SLATS DOES | | | NOT COMPLY WITH THIS REQUIREMENT. ADDITIONALLY, | | | LANDSCAPING WITH SHRUBS/HEDGES SHALL ALSO BE PROVIDED | | | IN FRONT OF THE FENCE/WALL TO THE MAXIMUM EXTENT | | | FEASIBLE. | | | ________________________________________ | | | | | | QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING: | | | | | | JOHN P. ROACH, AICP, PRINCIPAL PLANNER | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION | | | 401 CLEMATIS STREET - P.O. BOX 3147 | | | WEST PALM BEACH, FLORIDA 33402 | | | | | | P: 561.822.1448 | | | TTY: 800.955.8771 | | | E: [email protected] | | | | | | W: WPB.ORG | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
07-12-2021 |
|
|
Cont ID |
|
| Sent By |
jroach |
Date |
07-12-2021 |
Time |
15:07 |
Rev Time |
0.00 |
| Received By |
jroach |
Date |
07-12-2021 |
Time |
14:39 |
Sent To |
|
|
| Notes |
| 2021-07-12 15:07:34 | PLANS AND PLATS REVIEW COMMITTEE (PPRC) ZONING REVIEW | | | ________________________________________ | | | | | | DATE OF REVIEW: 07.12.2021 | | | PROJECT NO.: Z19090032 | | | CASE NO.: FSPR 19-06 | | | ________________________________________ | | | | | | PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING | | | REVIEW COMMENTS: | | | | | | 1. [ PARTIALLY SATISFIED ] - PURSUANT TO THE | | | DEVELOPMENT APPLICATION, THE FOLLOWING INFORMATION | | | SHALL BE PROVIDED: | | | | | | 1.1. [ SATISFIED ] - TWO (2) COPIES OF AN APPROVED | | | TRAFFIC CONCURRENCY DETERMINATION FROM PALM BEACH | | | COUNTY DEPARTMENT OF ENGINEERING AND PUBLIC WORKS ? | | | TRAFFIC DIVISION INDICATING THAT THE PROPOSED PROJECT | | | MEETS THE TRAFFIC PERFORMANCE STANDARDS OF PALM BEACH | | | COUNTY. | | | | | | 1.2. [ SATISFIED ] - A JUSTIFICATION STATEMENT | | | PROVIDING A GENERAL DESCRIPTION OF THE REQUEST, RELATED | | | BACKGROUND INFORMATION ON THE PROJECT AND SITE, AND | | | JUSTIFICATION, SPECIAL REASONS, OR BASIS FOR THE | | | REQUEST. | | | | | | 1.3. [ SATISFIED ] - LANDSCAPE PLANS CONTAINING ALL | | | INFORMATION CONTAINED IN THE LANDSCAPE PLAN CHECKLIST | | | (PAGE 15 OF THE DEVELOPMENT APPLICATION). | | | | | | 1.4. [ SATISFIED ] - ELECTRONIC COPIES OF ALL | | | DOCUMENTS, PLANS, ETC. SHALL BE PROVIDED. | | | | | | 1.5. [ SATISFIED ] - A COPY OF THE WARRANTY DEED FOR | | | THE PROPERTY SHALL BE PROVIDED. | | | | | | 1.6. [ NOT SATISFIED ] - UTILITY LETTERS SHALL BE | | | PROVIDED FROM ALL UTILITY COMPANIES (SEE PAGES 6-7 OF | | | THE DEVELOPMENT APPLICATION). | | | | | | 1.7. [ SATISFIED ] - RESPONSES TO THE STANDARDS FOR | | | CODE COMPLIANCE (SEE PAGE 30 OF THE DEVELOPMENT | | | APPLICATION). | | | | | | 1.8. [ SATISFIED ] - A CURRENT AND ACCURATE SURVEY | | | PROVING ALL ITEMS LISTED ON PAGES 5-6 OF THE | | | DEVELOPMENT APPLICATION. | | | | | | 2. [ PARTIALLY SATISFIED ] - THE SITE PLAN SHALL | | | CONTAIN ALL OF THE INFORMATION REQUIRED BY THE SITE | | | PLAN CHECKLIST, AS LISTED ON PAGE 14 OF THE DEVELOPMENT | | | APPLICATION. | | | | | | 2.1 [ NEW COMMENT ] - FOR THE SITE DATA TABLE, | | | PERCENTAGES ASSOCIATED WITH IMPERVIOUS SURFACE AREA, | | | OPEN SPACE, BUILDING COVERAGE, ETC. SHOULD BE REFLECTED | | | AS A PERCENTAGE OF THE OVERALL SITE AREA. | | | | | | 2.2. [ NEW COMMENT ] - PER SEC. 94-232(C)(4) OF THE | | | CITY'S ZLDRS, THE MAXIMUM FAR ALLOWED IS 0.75 - THE | | | SITE DATA TABLE INDICATES ONLY 0.2 IS PERMITTED. PLEASE | | | ADJUST ACCORDINGLY. | | | | | | 2.3. [ NEW COMMENT ] - PER SEC 94-232(B) OF THE CITY'S | | | ZLDRS, THE MAXIMUM BUIDLING PERMITTED IS 30 FEET - THE | | | SITE DATA TABLE INDICATES 40 FEET. PLEASE ADJUST | | | ACCORDINGLY. | | | | | | 3. [ SATISFIED ] - OWNER?S CONSENT FORM SHALL BE SIGNED | | | BY THE MAYOR, NOT STAFF. | | | | | | 4. [ SATISFIED ] - THE FOLLOWING INFORMATION ON SHEET | | | A0.0 IS INCORRECT: | | | | | | 4.1. [ SATISFIED ] - NAME OF MAYOR | | | | | | 4.2. [ SATISFIED ] - SPELLING OF COMMISSIONER SHOAF?S | | | NAME | | | | | | 4.3. [ SATISFIED ] - SPELLING OF COMMISSIONER NEERING?S | | | NAME | | | | | | 4.4. [ SATISFIED ] - NAME OF DISTRICT 3 COMMISSIONER | | | | | | 4.5. [ SATISFIED ] - NAME OF DISTRICT 4 COMMISSIONER | | | | | | 4.6. [ SATISFIED ] - ZONING DISTRICT IN THE PROJECT | | | DATA | | | | | | 5. [ SATISFIED ] - THE FOLLOWING INFORMATION ON ERDMAN | | | ANTHONY COVER SHEET IS INCORRECT: | | | | | | 5.1. [ SATISFIED ] - NAME OF MAYOR | | | | | | 5.2. [ SATISFIED ] - NAME OF DISTRICT 3 COMMISSIONER | | | | | | 5.3. [ SATISFIED ] - NAME OF DISTRICT 4 COMMISSIONER | | | | | | 5.4. [ SATISFIED ] - NAME OF THE CITY ADMINISTRATOR | | | | | | 6. [ SATISFIED ] - THE LOCATION OF THE PROPERTY LINE, | | | SHOWN ON THE SITE PLAN, DOES NOT APPEAR TO MATCH THAT | | | WHICH IS SHOWN ON THE EXISTING CONDITIONS SURVEY. AS | | | STATE ABOVE, A CURRENT AND ACCURATE SURVEY SHALL BE | | | PROVIDED AND SHALL BE THE BASIS FOR ALL SITE PLANS, | | | ETC. | | | | | | 7. [ SATISFIED ] - WINDOW DETAIL SHALL BE PROVIDED | | | SHOWING THAT ALL WINDOWS WILL BE RECESSED A MINIMUM OF | | | TWO (2) INCHES, AS REQUIRED BY SEC. 94-222(H)(6) OF THE | | | CITY?S ZLDRS. | | | | | | 8. [ SATISFIED ] - ELEVATIONS SHALL INDICATE THE | | | OVERALL HEIGHT OF THE BUILDING, AS DEFINED BY THE | | | CITY?S ZLDRS. | | | | | | 9. [ SATISFIED ] - PLEASE PROVIDE THE INFORMATION ON | | | THE PLANS NECESSARY TO SHOW COMPLIANCE WITH ARTICLE XV | | | (PARKING) OF THE CITY?S ZLDRS. PLEASE NOTE THAT | | | ON-STREET PARKING IMMEDIATELY ADJACENT TO THE SUBJECT | | | PROPERTY CAN BE COUNTED TOWARD THE PARKING | | | REQUIREMENTS, HOWEVER, PLEASE PROVIDE CONFIRMATION FROM | | | THE CITY?S TRAFFIC ENGINEER INDICATING THAT ON-STREET | | | PARKING IS ALLOWED ON SUCH STREETS, AND PROVIDE THE | | | NUMBER OF SPACES THAT CAN BE ACCOMMODATED. | | | | | | 10. [ SATISFIED ] - THE SITE PLAN INDICATES THAT THERE | | | ARE EIGHT (8) SPACES WITHIN THE EXISTING PARKING LOT, | | | HOWEVER, IT APPEARS THAT THERE ARE MAY BE NINE (9) OR | | | TEN (10) SPACES. VERIFY WITH THE SURVEY AND ADJUST THE | | | SITE PLAN ACCORDINGLY. | | | | | | 11. [ SATISFIED ] - BICYCLE PARKING SHALL BE PROVIDED | | | IN ACCORDANCE WITH SEC. 94-485(Q) OF THE CITY?S ZLDRS. | | | ENSURE THAT SUFFICIENT BICYCLE PARKING IS PROVIDED FOR | | | THE NEW GYMNASIUM, AS WELL AS THE EXISTING COMMUNITY | | | CENTER. | | | | | | 12. [ PARTIALLY SATISFIED ] - PLEASE CONFIRM THAT THE | | | PROJECT HAS BEEN PRESENTED TO THE COLEMAN PARK | | | NEIGHBORHOOD ASSOCIATION AND THAT RESIDENT FEEDBACK HAS | | | BEEN INCORPORATED INTO THE PLAN. A PRESENTATION SHALL | | | ALSO BE MADE TO THE COLEMAN PARK TASK FORCE (PLEASE | | | CONTACT ME FOR UPCOMING MEETING DATES). | | | | | | 12.1. [ NEW COMMENT ] - PLANNING STAFF WILL CONFIRM | | | WITH THE TAKS FORCE IN THEIR UPCOMING MEETING THAT THIS | | | PRESENTATION WAS MADE AND THAT ALL FEEDBACK HAS BEEN | | | INCORPORATED INOT THE PLAN. | | | | | | 13. [ PARTIALLY SATISFIED ] - PROVIDE INFORMATION | | | INDICATING THAT THE PROJECT WILL COMPLY WITH SEC. | | | 255.2575, FLORIDA STATUTES, REGARDING CONSTRUCTION OF | | | AN ENERGY-EFFICIENT AND SUSTAINABLE BUILDING. VERIFY | | | WHETHER OR NOT SIMILAR PROVISIONS ARE CONTAINED IN THE | | | CITY?S CODE OF ORDINANCES. | | | | | | 13.1 [ NEW COMMENT ] - PLANNING STAFF IS CONFIRMING | | | WHAT "RATING SYSTEM" OR "GREEN BUILDING CODE" NEEDS TO | | | BE ADHERED TO, AND AT WHAT LEVEL. ADDITIONAL | | | INFORMATION WILL BE PROVIDED. | | | | | | 14. [ NEW COMMENT ] - THE A/C EQUIPMENT PADS/AREA NEEDS | | | TO BE SCREENED FROM VIEW WITH A WALL OR OPAQUE FENCE | | | CONSISTING OF BRICK, DECORATIVE CONCRETE, OTHER | | | DECORATIVE MASONRY, OR COMPARABLY DURABLE WOOD/STEEL. | | | LANDSCAPING WITH SHRUBS/HEDGES SHALL ALSO BE PROVIDED. | | | ________________________________________ | | | | | | PLEASE NOTE THE FOLLOWING WHEN RESUBMITTING: | | | | | | A) WRITTEN RESPONSES TO COMMENTS MADE BY ALL | | | DEPARTMENTS SHALL BE PROVIDED UPON RESUBMISSION. | | | | | | B) ELECTRONIC COPY (PDF) OF ALL REVISED PLANS/DOCUMENTS | | | SHALL BE PROVIDED. | | | | | | C) PLEASE NOTE THAT RE-SUBMITTALS MAY BE SUBJECT TO | | | ADDITIONAL COMMENTS. | | | | | | D) IF NO RESPONSE IS RECEIVED WITHIN 60 DAYS OF THE | | | ISSUANCE OF THESE COMMENTS, THE APPLICATION WILL BE | | | CONSIDERED WITHDRAWN AND ANY FURTHER ACTION WILL | | | REQUIRE SUBMISSION OF A NEW DEVELOPMENT APPLICATION. | | | | | | E) PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20% OF THE ORIGINAL APPLICATION FEE. | | | ________________________________________ | | | | | | QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING: | | | | | | JOHN P. ROACH, AICP, PRINCIPAL PLANNER | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION | | | 401 CLEMATIS STREET - P.O. BOX 3147 | | | WEST PALM BEACH, FLORIDA 33402 | | | | | | P: 561.822.1448 | | | TTY: 800.955.8771 | | | E: [email protected] | | | | | | W: WPB.ORG | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
11-13-2019 |
|
|
Cont ID |
|
| Sent By |
jroach |
Date |
11-13-2019 |
Time |
10:45 |
Rev Time |
0.00 |
| Received By |
jroach |
Date |
11-13-2019 |
Time |
10:45 |
Sent To |
|
|
| Notes |
| 2019-11-13 10:46:11 | PLANS AND PLATS REVIEW COMMITTEE (PPRC) ZONING REVIEW | | | ________________________________________ | | | | | | DATE OF REVIEW: 11.13.2019 | | | PROJECT NO.: Z19090032 | | | CASE NO.: FSPR 19-06 | | | ________________________________________ | | | | | | PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING | | | REVIEW COMMENTS: | | | | | | 1. PURSUANT TO THE DEVELOPMENT APPLICATION, THE | | | FOLLOWING INFORMATION SHALL BE PROVIDED: | | | | | | 1.1. TWO (2) COPIES OF AN APPROVED TRAFFIC CONCURRENCY | | | DETERMINATION FROM PALM BEACH COUNTY DEPARTMENT OF | | | ENGINEERING AND PUBLIC WORKS ? TRAFFIC DIVISION | | | INDICATING THAT THE PROPOSED PROJECT MEETS THE TRAFFIC | | | PERFORMANCE STANDARDS OF PALM BEACH COUNTY. | | | | | | 1.2. A JUSTIFICATION STATEMENT PROVIDING A GENERAL | | | DESCRIPTION OF THE REQUEST, RELATED BACKGROUND | | | INFORMATION ON THE PROJECT AND SITE, AND JUSTIFICATION, | | | SPECIAL REASONS, OR BASIS FOR THE REQUEST. | | | | | | 1.3. LANDSCAPE PLANS CONTAINING ALL INFORMATION | | | CONTAINED IN THE LANDSCAPE PLAN CHECKLIST (PAGE 15 OF | | | THE DEVELOPMENT APPLICATION). | | | | | | 1.4. ELECTRONIC COPIES OF ALL DOCUMENTS, PLANS, ETC. | | | SHALL BE PROVIDED. | | | | | | 1.5. A COPY OF THE WARRANTY DEED FOR THE PROPERTY SHALL | | | BE PROVIDED. | | | | | | 1.6. UTILITY LETTERS SHALL BE PROVIDED FROM ALL UTILITY | | | COMPANIES (SEE PAGES 6-7 OF THE DEVELOPMENT | | | APPLICATION). | | | | | | 1.7. RESPONSES TO THE STANDARDS FOR CODE COMPLIANCE | | | (SEE PAGE 30 OF THE DEVELOPMENT APPLICATION). | | | | | | 1.8. A CURRENT AND ACCURATE SURVEY PROVING ALL ITEMS | | | LISTED ON PAGES 5-6 OF THE DEVELOPMENT APPLICATION. | | | | | | 2. THE SITE PLAN SHALL CONTAIN ALL OF THE INFORMATION | | | REQUIRED BY THE SITE PLAN CHECKLIST, AS LISTED ON PAGE | | | 14 OF THE DEVELOPMENT APPLICATION. | | | | | | 3. OWNER?S CONSENT FORM SHALL BE SIGNED BY THE MAYOR, | | | NOT STAFF. | | | | | | 4. THE FOLLOWING INFORMATION ON SHEET A0.0 IS | | | INCORRECT: | | | | | | 4.1. NAME OF MAYOR | | | | | | 4.2. SPELLING OF COMMISSIONER SHOAF?S NAME | | | | | | 4.3. SPELLING OF COMMISSIONER NEERING?S NAME | | | | | | 4.4. NAME OF DISTRICT 3 COMMISSIONER | | | | | | 4.5. NAME OF DISTRICT 4 COMMISSIONER | | | | | | 4.6. ZONING DISTRICT IN THE PROJECT DATA | | | | | | 5. THE FOLLOWING INFORMATION ON ERDMAN ANTHONY COVER | | | SHEET IS INCORRECT: | | | | | | 5.1. NAME OF MAYOR | | | | | | 5.2. NAME OF DISTRICT 3 COMMISSIONER | | | | | | 5.3. NAME OF DISTRICT 4 COMMISSIONER | | | | | | 5.4. NAME OF THE CITY ADMINISTRATOR | | | | | | 6. THE LOCATION OF THE PROPERTY LINE, SHOWN ON THE SITE | | | PLAN, DOES NOT APPEAR TO MATCH THAT WHICH IS SHOWN ON | | | THE EXISTING CONDITIONS SURVEY. AS STATE ABOVE, A | | | CURRENT AND ACCURATE SURVEY SHALL BE PROVIDED AND SHALL | | | BE THE BASIS FOR ALL SITE PLANS, ETC. | | | | | | 7. WINDOW DETAIL SHALL BE PROVIDED SHOWING THAT ALL | | | WINDOWS WILL BE RECESSED A MINIMUM OF TWO (2) INCHES, | | | AS REQUIRED BY SEC. 94-222(H)(6) OF THE CITY?S ZLDRS. | | | | | | 8. ELEVATIONS SHALL INDICATE THE OVERALL HEIGHT OF THE | | | BUILDING, AS DEFINED BY THE CITY?S ZLDRS. | | | | | | 9. PLEASE PROVIDE THE INFORMATION ON THE PLANS | | | NECESSARY TO SHOW COMPLIANCE WITH ARTICLE XV (PARKING) | | | OF THE CITY?S ZLDRS. PLEASE NOTE THAT ON-STREET PARKING | | | IMMEDIATELY ADJACENT TO THE SUBJECT PROPERTY CAN BE | | | COUNTED TOWARD THE PARKING REQUIREMENTS, HOWEVER, | | | PLEASE PROVIDE CONFIRMATION FROM THE CITY?S TRAFFIC | | | ENGINEER INDICATING THAT ON-STREET PARKING IS ALLOWED | | | ON SUCH STREETS, AND PROVIDE THE NUMBER OF SPACES THAT | | | CAN BE ACCOMMODATED. | | | | | | 10. THE SITE PLAN INDICATES THAT THERE ARE EIGHT (8) | | | SPACES WITHIN THE EXISTING PARKING LOT, HOWEVER, IT | | | APPEARS THAT THERE ARE MAY BE NINE (9) OR TEN (10) | | | SPACES. VERIFY WITH THE SURVEY AND ADJUST THE SITE PLAN | | | ACCORDINGLY. | | | | | | 11. BICYCLE PARKING SHALL BE PROVIDED IN ACCORDANCE | | | WITH SEC. 94-485(Q) OF THE CITY?S ZLDRS. ENSURE THAT | | | SUFFICIENT BICYCLE PARKING IS PROVIDED FOR THE NEW | | | GYMNASIUM, AS WELL AS THE EXISTING COMMUNITY CENTER. | | | | | | 12. PLEASE CONFIRM THAT THE PROJECT HAS BEEN PRESENTED | | | TO THE COLEMAN PARK NEIGHBORHOOD ASSOCIATION AND THAT | | | RESIDENT FEEDBACK HAS BEEN INCORPORATED INTO THE PLAN. | | | A PRESENTATION SHALL ALSO BE MADE TO THE COLEMAN PARK | | | TASK FORCE (PLEASE CONTACT ME FOR UPCOMING MEETING | | | DATES). | | | | | | 13. PROVIDE INFORMATION INDICATING THAT THE PROJECT | | | WILL COMPLY WITH SEC. 255.2575, FLORIDA STATUTES, | | | REGARDING CONSTRUCTION OF AN ENERGY-EFFICIENT AND | | | SUSTAINABLE BUILDING. VERIFY WHETHER OR NOT SIMILAR | | | PROVISIONS ARE CONTAINED IN THE CITY?S CODE OF | | | ORDINANCES. | | | | | | ________________________________________ | | | | | | PLEASE NOTE THE FOLLOWING WHEN RESUBMITTING: | | | | | | A) WRITTEN RESPONSES TO COMMENTS MADE BY ALL | | | DEPARTMENTS SHALL BE PROVIDED UPON RESUBMISSION. | | | | | | B) 4 SETS OF REVISED PLANS AND/OR DOCUMENTS SHALL BE | | | PROVIDED, ALONG WITH ONE (1) REDUCED COPY (11IN X | | | 17IN), AND AN ELECTRONIC COPY OF ALL PLANS. | | | | | | C) PLEASE NOTE THAT RE-SUBMITTALS MAY BE SUBJECT TO | | | ADDITIONAL COMMENTS. | | | | | | D) IF NO RESPONSE IS RECEIVED WITHIN 60 DAYS OF THE | | | ISSUANCE OF THESE COMMENTS, THE APPLICATION WILL BE | | | CONSIDERED WITHDRAWN AND ANY FURTHER ACTION WILL | | | REQUIRE SUBMISSION OF A NEW DEVELOPMENT APPLICATION. | | | | | | E) PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20% OF THE ORIGINAL APPLICATION FEE. | | | ________________________________________ | | | | | | QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING: | | | | | | JOHN P. ROACH, AICP, PRINCIPAL PLANNER | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION | | | 401 CLEMATIS STREET - P.O. BOX 3147 | | | WEST PALM BEACH, FLORIDA 33402 | | | | | | P: 561.822.1448 | | | TTY: 800.955.8771 | | | E: [email protected] | | | | | | W: WPB.ORG | | | |
|
|
| |