| Plan Review Stops For Project Z19090011 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
10-09-2019 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
10-09-2019 |
Time |
19:24 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
10-09-2019 |
Time |
19:24 |
Sent To |
|
|
| Notes |
| 2019-10-09 19:30:09 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. LOCATION OF ACCESSIBLE PARKING SPACES. SITE PLAN, | | | SHEET C-120, SHOWS THAT THE PROPOSAL IS TO LEAVE THE | | | EXISTING ACCESSIBLE PARKING SPACES IN THE EXISTING | | | LOCATIONS, YET ADD REGULAR PARKING SPACES CLOSER TO THE | | | BUILDING ENTRANCE THAN THE ACCESSIBLE PARKING SPACES. | | | IF NEW PARKING SPACES ARE BEING PROVIDED, THE CLOSEST | | | PARKING SPACES TO THE BUILDING ENTRANCE SHALL BE THE | | | REQUIRED ACCESSIBLE PARKING SPACES. PER SECTION 208.3 | | | OF FLORIDA ACCESSIBILITY CODE, ACCESSIBLE PARKING | | | SPACES ARE TO BE LOCATED ON THE SHORTEST POSSIBLE ROUTE | | | OF TRAVEL FROM ADJACENT PARKING TO AN ACCESSIBLE | | | ENTRANCE. THE DESIGN OF ACCESSIBLE PARKING SPACES SHALL | | | COMPLY WITH SECTION 502 OF FLORIDA ACCESSIBILITY CODE | | | | | | 3. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, SITE LIGHTING, SITE LANDSCAPE, SITE | | | IRRIGATION, ETC. | | | | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
10-07-2019 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
10-07-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
10-07-2019 |
Time |
|
Sent To |
|
|
| Notes |
| 2019-10-07 10:18:36 | IS THERE A PIPE CONNECTION CROSSING I-95 AT THE CITY OF | | | WEST PALM BEACH PROPERTY CONNECTION? | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | | | | RICK ROSSANO, PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 (MAILING ADDRESS: P.O. BOX | | | 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1098 | | | FAX: (561) 494-1116 MOBILE: (561) 246-9525 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | MANNY GONZALEZ, SENIOR ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 (MAILING ADDRESS: P.O. BOX | | | 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 MOBILE: (561) 644-7301 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
10-03-2019 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
10-03-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
10-03-2019 |
Time |
16:38 |
Sent To |
|
|
| Notes |
| 2019-10-03 16:39:58 | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, | | | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM | | | BEACH FIRE RESCUE. | | | | | | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE | | | PROPOSED. | | | |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
2 |
Status |
P |
Date |
12-05-2019 |
|
|
Cont ID |
|
| Sent By |
|
Date |
12-05-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
12-05-2019 |
Time |
|
Sent To |
|
|
| Notes |
| 2019-12-05 07:27:43 | NO FURTHER COMMENTS. |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
10-09-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
10-09-2019 |
Time |
|
Sent To |
|
|
| Notes |
| 2019-10-09 12:31:11 | PLEASE PROVIDE THE FOLLOWINGS: | | | - LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID | | | WASTE VOLUME PRODUCED ALONG WITH THE SIZE OF THE | | | DUMPSTER/COMPACTOR THAT WILL BE UTILIZED. | | | - FOR A FREESTANDING SITE DUMPSTER ENCLOSURE, THE | | | ENCLOSURE SHALL COMPLY WITH THE LATEST REVISION OF CITY | | | OF WEST PALM BEACH GENERAL CONSTRUCTION-GARBAGE | | | ENCLOSURE STANDARD, CG-8. | | | - AUTO-TURN FOR THE SANITATION SERVICE TRUCK | | | - CONTINGENCY PLAN, FOR WHEN THE COMPACTOR IS OUT OF | | | SERVICE (I.E. CITY DUMPSTER,ETC.) | | | - DESIGNATED LOCATION FOR THE BULK ITEM PICK UP AND | | | RECYCLING CONTAINERS | | | | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
10-08-2019 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
10-08-2019 |
Time |
07:38 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2019-10-08 08:33:17 | 1. A SEPARATE PLAT REVIEW WILL BE REQUIRED THROUGH | | | ENGINEERING SERVICES. | | | 2. ON-SITE WATER AND SEWER TO BE PRIVATE. | | | 3. AGREEMENT IN ORB 4387/1879 MAY NEED TO BE MODIFIED. | | | IS APPROVAL FROM PERINI LAND REQUIRED? | | | 4. CROSS ACCESS/UTILITY/DRAINAGE AGREEMENT WILL BE | | | REQUIRED. | | | 5. ADD CONVERSION TO NGVD-29 TO SURVEY AND ENGINEERING | | | PLANS. | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
11-27-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| |
Print |