Plan Review Details - Project Z19040012
| Plan Review Stops For Project Z19040012 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
05-06-2019 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
05-06-2019 |
Time |
19:17 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
05-06-2019 |
Time |
19:17 |
Sent To |
|
|
| Notes |
| 2019-05-06 19:27:12 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. DEMOLITION OF THE EXISTING BUILDING. AN ASBESTOS | | | SURVEY SHALL BE PERFORMED AND AN ASBESTOS ABATEMENT | | | REPORT SUBMITTED TO THE HEALTH DEPARTMENT PALM BEACH | | | COUNTY OFFICE. CONTACT ALEX ORTEGA AT (561) 837-5963, | | | OR BY EMAIL: [email protected] | | | | | | 3. LOCATION OF ACCESSIBLE PARKING SPACES. SITE PLAN, | | | SHEET SP-1, SHOWS THAT THE ACCESSIBLE PARKING SPACES | | | ARE NOT THE CLOSEST PARKING SPACES TO THE ELEVATOR. PER | | | FAIR HOUSING ACT, ACCESSIBLE PARKING SPACES ARE TO BE | | | LOCATED ON THE SHORTEST POSSIBLE ROUTE OF TRAVEL FROM | | | ADJACENT PARKING TO AN ACCESSIBLE ENTRANCE. LOCATION OF | | | THE ACCESSIBLE PARKING SPACES CLOSEST TO THE ELEVATORS | | | IS REQUIRED IN ORDER TO GIVE EQUIVALENT FACILITATION TO | | | WHEELCHAIR USERS FOR ACCESS TO THE UNITS ON THE 2ND AND | | | 3RD FLOORS. | | | | | | 4. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 5. BUILDING LOCATION RELATIVE TO THE PROPERTY LINE AND | | | OTHER STRUCTURES. WHEN SUBMITTED FOR BUILDING PERMIT, | | | COMPLIANCE WITH ALL BUILDING SEPARATION, PERCENTAGE OF | | | OPENINGS AND OPENING PROTECTIVE REQUIREMENTS OF | | | CHAPTERS 6 AND 7 OF THE FLORIDA BUILDING CODE SHALL BE | | | VERIFIED. | | | | | | 6. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS, | | | GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND | | | OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS, | | | SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC. | | | | | | 7. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT | | | WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL | | | HAVE A SEPARATE ADDRESS. FOR STREET ADDRESSING, CONTACT | | | MICHAEL ORIO, GIS SUPPORT SPECIALIST, AT (561) 494 | | | 1080, OR BY EMAIL: [email protected] | | | | | | 8.ART IN PUBLIC PLACES. THIS PROJECT WILL BE SUBJECT TO | | | ART IN PUBLIC PLACES (AIPP) ASSESSMENT. FOR ADVICE ON | | | THE PROVISION OF PUBLIC ARTWORK IN LIEU OF THE AIPP | | | ASSESSMENT, CONTACT SYBILLE WELTER, ART IN PUBLIC | | | PLACES COORDINATOR, AT (561) 822-1521, OR BY EMAIL: | | | [email protected] | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
05-02-2019 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
05-02-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
05-02-2019 |
Time |
|
Sent To |
|
|
| Notes |
| 2019-05-02 12:39:12 | PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY OF | | | WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC RIGHT | | | OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF YOUR | | | PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE | | | MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL | | | IN THE WPB ENGINEERING SERVICES DEPARTMENT AT | | | [email protected] OR 561-494-1079 FOR FURTHER | | | ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION | | | ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD | | | SURVEY, POT-HOLING, SOFT DIGS ETC. | | | | | | PLANS SHALL SHOW PROPOSED & EXISTING LOCATIONS AND | | | DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND | | | SEWER LINES, INCLUDING STUBS TO EACH PROPERTY LINE FOR | | | WATER AND SANITARY SEWERS, THE MAKE AND MODEL OF ALL | | | VALVES, METERS, AND OTHERS DEVICES TO BE INSTALLED ON | | | THE SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING | | | GRADES, PIPES SIZES, MATERIALS, ELEVATIONS, | | | ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL | | | INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER | | | LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE | | | PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN | | | VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. | | | ADDITIONALLY, PLAN VIEW SHALL SHOW ALL EXISTING AND | | | PROPOSED UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER | | | OPTIC, ELECTRIC, GAS, AND CABLEVISION & | | | TELECOMMUNICATION FACILITIES LOCATED ON THE | | | RIGHT-OF-WAY. | | | | | | PROVIDE PROFILE AND CLEARANCES AT ALL UTILITY | | | CROSSINGS. | | | | | | SHOW VERTICAL DATUM AND DATUM CONVERSION INFORMATION | | | (NAVD 88 AND NGVD 29). | | | | | | CUT AND CAP UTILITIES NOT IN USE, AND REMOVE ANY | | | ABANDONED UTILITY LINES LARGER THAN 2INCHES FROM CITY | | | RIGHT OF WAY. | | | | | | PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE | | | DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB | | | DEVELOPMENT APPLICATION). | | | | | | PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER ALONG | | | ENTIRE PROJECT FRONTAGE. | | | | | | PROVIDE VERTICAL DATUM AND DATUM CONVERSION INFORMATION | | | (NAVD 1988 AND NGVD 1929). | | | | | | PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND | | | IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED | | | AREAS. | | | | | | THE CITY REQUESTS THE EXTENSION OF THE 8 IN. WATER LINE | | | WITHIN THE ALLEY IMPROVEMENT AREA TO THE NORTH PROPERTY | | | LINE. | | | | | | THE CITY REQUESTS THAT THE DEVELOPER PROVIDE SEPARATE | | | TAPS FOR FIRE AND DOMESTIC SERVICES. | | | | | | SHEET 2.0: CORRECT THE CALL OUT FOR 6 IN. LINE FROM | | | "C.A." TO CAST IRON. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | | | | RICK ROSSANO | | | PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1098 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 246-9525 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | MANNY GONZALEZ | | | SENIOR ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 644-7301 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | CENTRAL OPERATIONS CENTER (DISPATCH): | | | 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC | | | UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210 | | | | | | | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
P |
Date |
06-13-2019 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
06-13-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
06-13-2019 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
04-29-2019 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
04-29-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
04-29-2019 |
Time |
16:56 |
Sent To |
|
|
| Notes |
| 2019-04-29 16:55:00 | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, | | | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM | | | BEACH FIRE RESCUE. | | | | | | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE | | | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. | | | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS | | | ARE SUBMITTED FOR PERMIT. | | | | | | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE | | | PROPOSED PROJECT. | | | | | | THE FOLLOWING COMMENTS MAY BE CONSIDERED MORE RELATED | | | TO BUILDING CONSTRUCTION PLAN REVIEW; | | | | | | 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY | | | WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE | | | PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A | | | PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED | | | TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN | | | STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY | | | MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER | | | PROTECTION. | | | | | | 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY | | | IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING | | | ALL CONSTRUCTION ACTIVITIES. | | | | | | 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM | | | ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION. | | | ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND | | | AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT | | | WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS. | | | | | | 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE | | | REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE | | | ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS. | | | | | | 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH | | | THE 6TH EDITION OF THE FLORIDA FIRE PREVENTION CODE, | | | INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES. | | | | | | 6. FOR PLAN REVIEW SUBMITTAL, PLEASE INCLUDE THE | | | OCCUPANCY TYPE, PER THE FLORIDA FIRE PREVENTION CODE.. | | | | | | 7. FOR PLAN REVIEW SUBMITTAL, PLEASE ENSURE THAT A FIRE | | | LOAD CALCULATION IS INCLUDED AND THAT ADEQUATE WATER | | | SUPPLY IS EXISTING OR WILL BE PROVIDED. | | | | | | 8. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED | | | ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF | | | FIRE PREVENTION. | | | | | | ALL NEW FIRE HYDRANTS AND FDC?S PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLOSELY COORDINATED WITH THE | | | BUREAU OF FIRE PREVENTION. PROPOSED FIRE HYDRANTS AND | | | FDC?S SHOULD BE LOCATED ON THE SAME SIDE OF THE STREET | | | OR ACCESS ROADWAY TO ALLOW FREE ACCESS FOR OTHER | | | ARRIVING EMERGENCY VEHICLES. | | | | | | THE PROPOSED LOCATION SUBMITTED ARE ACCETABLE. ANY | | | CHANGES NEED TO BE REVIEWED THROUGH THE OFFICE OF THE | | | FIRE MARSHAL. | | | | | | 9. PROVIDE FOR A FIRE SPRINKLER AND/OR FIRE ALARM PER | | | THE APPLICABLE OCCUPANCY CODE. FOR ANY LIFE SAFETY | | | ENGINEERED SYSTEM, I.E FIRE SPRINKLER AND FIRE ALARM, | | | ENSURE THEY COMPLY WITH THE REQUIREMENTS OF FS 61G AND | | | SUBMITTED WITH THE MASTER PLAN. | | | | | | 10. COMPLETE LIFE SAFETY PLANS SHALL BE PROVIDED THAT | | | ILLUSTRATE OCCUPANT LOADS, TRAVEL DISTANCES, COMMON | | | PATHS OF TRAVEL, DEAD-END CORRIDORS, EXIT SIGNS, | | | EMERGENCY LIGHTING, EXITS LEADING TO A PUBLIC WAY, FIRE | | | EXTINGUISHER LOCATIONS, AND ALL FIRE SAFETY FEATURES | | | AND EQUIPMENT. | | | | | | 11. IT IS HIGHLY RECOMMENDED (REQUIRED WITH FIRE | | | SPRINKLER SYSTEM) THAT A KNOX BOX WITH KEYS FOR ENTRY | | | DOOR LOCKS BE PROVIDED FOR 24 HOUR EMERGENCY ACCESS. | | | | | | 12. FIRE LANE IDENTIFICATION THAT WOULD INCLUDE CURB | | | PAINTING AND SIGNAGE WOULD BE REQUIRED AROUND THE | | | LANDSCAPE ISLAND. PLEASE COORDINATE WITH THE OFFICE OF | | | THE FIRE MARSHAL. | | | | | | 13. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT | | | DOES NOT CONSTITUTE ITS FINAL REVIEW OR APPROVAL. | | | | | | 14. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING | | | PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH | | | THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
F |
Date |
06-25-2019 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
06-25-2019 |
Time |
16:58 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
06-25-2019 |
Time |
16:58 |
Sent To |
|
|
| Notes |
| 2019-06-25 16:59:04 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 | | | PROJECT: MERCER PARK APARTMENTS Z19040012 | | | JUNE 21, 2019 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. SATISFIED. PLEASE REVISE TREE CANOPY IMPACT PLAN | | | SHEET LP-1 TO SHOW: | | | ? CORRECT TREE #39 TO 491 SQ FT CANOPY | | | ? ALL NATIVE TREES AND PALMS IN GOOD CONDITION MUST BE | | | PRESERVED OR RELOCATED, AND NATIVE TREES #13, 43, 71, | | | 83, AND 99 ARE SHOWN IN GOOD CONDITION. | | | | | | 2. SATISFIED. SOME LANDSCAPE TERMINAL ISLANDS DO NOT | | | MEET THE CODE REQUIREMENTS OF SECTION 94-443(C)(3)A. | | | FOR LANDSCAPE AREA WIDTH OF 8 FEET FOR THE FULL LENGTH | | | OF THE PARKING SPACE. THE TERMINAL ISLANDS AND SHADE | | | TREES ARE ALSO LACKING ADJACENT TO THE ELEVATOR SHAFTS. | | | REVISE PLAN TO MEET REQUIREMENTS. | | | | | | 3. SATISFIED. PROVIDE AN EXHIBIT SHOWING THE PARKING | | | AREA SURFACE CALCULATIONS, PARKING SPACE AREAS AND | | | LANDSCAPE AREAS PROVIDED TO DEMONSTRATE COMPLIANCE WITH | | | SECTIONS 94-443 (C)(3) AND (4). | | | | | | 4. PARTIALLY SATISFIED. TREES MUST BE ADDED TO PROVIDE | | | SHADE FOR THE SIDEWALK IN THE AREA OF STREET PARKING | | | ALONG ALPHA STREET. THE UTILITIES SHOULD BE RELOCATED | | | TO ALLOW PLANTING AT EACH END OF THE SPACES, AND LARGER | | | SHADE TREES ADDED WITHIN THE PROPERTY LINE IN THE | | | CENTER TO PROVIDE SHADE. | | | STAFF SUGGESTS REMOVING THE CENTER PARKING SPACE AND | | | ADDING AN ISLAND AND LIVE OAK TREE. | | | | | | | | | 5. PARTIALLY SATISFIED. SHOW THE ADDITIONAL 51 TREES | | | REQUIRED, ONE FOR EACH UNIT PER SECTION 94-443(D), IN | | | THE LANDSCAPE DATA CHART. ADD TO THE TOTAL SHADE TREE | | | AND FLOWERING TREE REQUIREMENT FOR OPEN SPACE TO SHOW | | | THE TOTAL TREE REQUIREMENT. BUFFER AND PARKING LOT | | | TREES ARE COUNTED TOWARD SATISFYING THIS REQUIREMENT. | | | THE CHART NEEDS TO BE CLARIFIED TO SHOW REQUIRED AND | | | PROVIDED SHADE TREES, FLOWERING TREES AND ADDITIONAL | | | MULTIFAMILY TREES. SHOW TOTAL OF REQUIRED AND PROVIDED. | | | | | | 6. SATISFIED. PROVIDE LOCATIONS OF LIGHTING ON THE | | | LANDSCAPE PLAN TO AVOID CONFLICTS WITH LANDSCAPING. | | | | | | 7. PARTIALLY SATISFIED. SHOW EACH BUFFER SEGMENT IN THE | | | BUFFER CALCULATIONS TO SHOW REQUIRED AND PROVIDED | | | BUFFER TREE COUNTS. | | | CHART NEEDS TO BE CLEAR, CAN BE TOTAL EACH SIDE- NORTH, | | | SOUTH, EAST AND WEST BUFFERS, SHOW LINEAR FEET AND | | | REQUIRED AND PROVIDED BUFFER TREES. | | | | | | 8. SATISFIED. SHOW PROOF OF PROVIDING THE EFFICIENT | | | IRRIGATION OR MOISTURE SENSOR AS CLAIMED ON THE FLORIDA | | | FRIENDLY DESIGN OPTION CHART. | | | | | | | | | 9. SATISFIED. PROVIDE ROOT BARRIER LOCATIONS WHERE | | | NEEDED TO PROTECT UTILITIES. | | | | | | 10. SATISFIED. ADD TREES AND PALMS TO REMAIN OR BE | | | RELOCATED ON SITE TO THE PLANT LIST. | | | | | | 11. SATISFIED. ADJUST THE SHRUB NATIVE PERCENTAGE TO | | | MATCH THE SHRUB LIST. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH | | | THIS PETITION. | | | | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION AS PERMITTED AND | | | INSTALLED. THIS WILL BE THROUGH A SEPARATE MAINTENANCE | | | AGREEMENT WITH THE CITY. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
05-03-2019 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
05-03-2019 |
Time |
15:35 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
05-03-2019 |
Time |
15:35 |
Sent To |
|
|
| Notes |
| 2019-05-03 15:36:25 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 | | | PROJECT: MERCER PARK APARTMENTS Z19 | | | MAY 3, 2019 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. PLEASE REVISE TREE CANOPY IMPACT PLAN SHEET LP-1 TO | | | SHOW: | | | ? CORRECT TREE #39 TO 491 SQ FT CANOPY | | | ? ALL NATIVE TREES AND PALMS IN GOOD CONDITION MUST BE | | | PRESERVED OR RELOCATED, AND NATIVE TREES #13, 43, 71, | | | 83, AND 99 ARE SHOWN IN GOOD CONDITION. | | | | | | 2. SOME LANDSCAPE TERMINAL ISLANDS DO NOT MEET THE CODE | | | REQUIREMENTS OF SECTION 94-443(C)(3)A. FOR LANDSCAPE | | | AREA WIDTH OF 8 FEET FOR THE FULL LENGTH OF THE PARKING | | | SPACE. THE TERMINAL ISLANDS AND SHADE TREES ARE ALSO | | | LACKING ADJACENT TO THE ELEVATOR SHAFTS. REVISE PLAN TO | | | MEET REQUIREMENTS. | | | | | | 3. PROVIDE AN EXHIBIT SHOWING THE PARKING AREA SURFACE | | | CALCULATIONS, PARKING SPACE AREAS AND LANDSCAPE AREAS | | | PROVIDED TO DEMONSTRATE COMPLIANCE WITH SECTIONS 94-443 | | | (C)(3) AND (4). | | | | | | 4. TREES MUST BE ADDED TO PROVIDE SHADE FOR THE | | | SIDEWALK IN THE AREA OF STREET PARKING ALONG ALPHA | | | STREET. THE UTILITIES SHOULD BE RELOCATED TO ALLOW | | | PLANTING AT EACH END OF THE SPACES, AND LARGER SHADE | | | TREES ADDED WITHIN THE PROPERTY LINE IN THE CENTER TO | | | PROVIDE SHADE. | | | | | | | | | 5. SHOW THE ADDITIONAL 51 TREES REQUIRED, ONE FOR EACH | | | UNIT PER SECTION 94-443(D), IN THE LANDSCAPE DATA | | | CHART. ADD TO THE TOTAL SHADE TREE AND FLOWERING TREE | | | REQUIREMENT FOR OPEN SPACE TO SHOW THE TOTAL TREE | | | REQUIREMENT. BUFFER AND PARKING LOT TREES ARE COUNTED | | | TOWARD SATISFYING THIS REQUIREMENT. | | | | | | 6. PROVIDE LOCATIONS OF LIGHTING ON THE LANDSCAPE PLAN | | | TO AVOID CONFLICTS WITH LANDSCAPING. | | | | | | 7. SHOW EACH BUFFER SEGMENT IN THE BUFFER CALCULATIONS | | | TO SHOW REQUIRED AND PROVIDED BUFFER TREE COUNTS. | | | | | | 8. SHOW PROOF OF PROVIDING THE EFFICIENT IRRIGATION OR | | | MOISTURE SENSOR AS CLAIMED ON THE FLORIDA FRIENDLY | | | DESIGN OPTION CHART. | | | | | | | | | 9. PROVIDE ROOT BARRIER LOCATIONS WHERE NEEDED TO | | | PROTECT UTILITIES. | | | | | | 10. ADD TREES AND PALMS TO REMAIN OR BE RELOCATED ON | | | SITE TO THE PLANT LIST. | | | | | | 11. ADJUST THE SHRUB NATIVE PERCENTAGE TO MATCH THE | | | SHRUB LIST. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH | | | THIS PETITION. | | | | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION AS PERMITTED AND | | | INSTALLED. THIS WILL BE THROUGH A SEPARATE MAINTENANCE | | | AGREEMENT WITH THE CITY. | | | | | | | | | |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
2 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
05-13-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
05-03-2019 |
Time |
|
Sent To |
|
|
| Notes |
| 2019-05-13 09:51:20 | PLEASE PROVIDE THE UPDATED PLANS TO REFLECT THE | | | COMPLAINCE TO OUR DUMPSTER ENCLOSURE SPECIFICATION, | | | ATTACHED. | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
F |
Date |
05-03-2019 |
|
|
Cont ID |
|
| Sent By |
|
Date |
06-26-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
06-26-2019 |
Time |
|
Sent To |
|
|
| Notes |
| 2019-05-07 16:34:19 | PLEASE PROVIDE A PLAN SHOWING (SANITATION TRUCK) AUTO | | | TURN FROM THE INBOUND DIRECTIONS AND THROUGH THE | | | OUTBOUND FOR BOTH DUMPSTERS ON THE EAST AND WEST SIDES. | | | | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
F |
Date |
06-26-2019 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
06-26-2019 |
Time |
19:26 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2019-06-26 19:42:37 | THE COMMENTS BELOW ARE FROM THE REVIEW OF THE 6/10/19 | | | SUBMITTAL PACKAGE. | | | | | | IF ANOTHER SUBMITTAL IS NOT NEEDED FOR SITE PLAN | | | APPROVAL THEN THESE COMMENTS CAN BE PROVISIONAL AND | | | ADDRESSED ON THE PLANS THAT WILL BE INCLUDED WITH THE | | | ENGINEERING PERMIT SUBMITTAL. | | | 1. CALL OUT WEIR FOR PARALLEL PARKING DRAINAGE SYSTEM | | | (EITHER IN STRUCTURE S-301 OR S-302 (PREFERED). | | | | | | 2. PROVIDE A MEANS TO ACCESS THE WEST END OF THE | | | PARALLEL PARKING EXFILTRATION TRENCH. | | | | | | 3. INCLUDE PRB CALLOUTS AND DIRECTIONS (N,S,E,W ETC.) | | | IN THE DRAINAGE STRUCTURE CALLOUTS. | | | | | | 4. THERE APPEARS TO BE A LOW SPOT WHERE THE 10-FOOT | | | DRAINAGE EASEMENT IS IN THE ALLEY. | | | | | | 5. CONFIRM THE STORMWATER RUNOFF FROM THE NORTH END OF | | | THE PAVER ALLEY WILL REACH A DRAINAGE STRUCTURE AND NOT | | | POND IN THE ALLEY OR DRAIN TO ANOTHER LOT. | | | | | | 6. INCLUDE PAVEMENT FLOW ARROWS FOR THE ALLEY. | | | | | | 7. PROVIDE TYPICAL CROSS SECTIONS FOR: | | | A. ALPHA STREET RIGHT OF WAY WEST AND EAST (SHOWING | | | PARALLEL PARKING) OF THE ALLEY | | | B. ALLEY | | | | | | 8. PROVIDE A PROFILE VIEW OF THE STORM PIPE BETWEEN | | | STRUCTURES S-104 AND S-303. PROFILE ONLY NEEDS TO BE OF | | | THE RIGHT-OF-WAY AND INCLUDE ALL UTILITY | | | CROSSINGS/CONFLICTS WITH THE STORM PIPE. | | | | | | 9. SIDEWALK ACCESS EASEMENT WILL BE NEEDED AT THE | | | SOUTHEAST CORNER OF THE EAST PARCEL. | | | | | | 10. CCTV OF EXISTING STORM SYSTEM WILL BE NEEDED | | | (REPEAT COMMENT). | | | | | | 11. BERMS AND/OR SWALES MAY BE NEEDED TO PREVENT RUNOFF | | | ONTO ADJACENT PROPERTIES. | | | | | | 12. THE ONSITE AREAS BEHIND THE SIDEWALKS IN THE | | | RIGHT-OF-WAY ARE TO BE DEPRESSED TO PREVENT ONSITE | | | STORMWATER RUNOFF FROM CROSSING THE SIDEWALK. | | | | | | 13. ROOF DRAINS SHOULD CONNECT DIRECTLY TO THE DRAINAGE | | | SYSTEM OR BE DIRECTED TO DISCHARGE ONTO PERVIOUS AREAS. | | | | | | 14. SHOW A REPLACEMENT WATER SERVICE FROM THE NEW WATER | | | MAIN TO THE PROPERTY ON THE SOUTH SIDE OF ALPHA STREET | | | SOUTH OF BUILDING 'B'. (REPEAT COMMENT) | | | | | | 15. EXISTING CURB RAMPS LEADING TO NEW PAVMENT OR TO | | | MILLED AND OVERLAID PAVEMENT ARE TO BE CONSTRUCTED TO | | | CURRENT ADA STANDARDS. | | | | | | 16. TWO-WAY SIGN ON WEST SIDE OF THE ALLEY SHOWN ON | | | PRIVATE PROPERTY. | | | | | | 17. CURBING SOUTH OF SIGN REFERENCED IN COMMENT #16 | | | ABOVE APPEARS TO CROSS PRIVATE PROPERTY. | | | | | | 18. DUE TO THE LARGE DROP OFF, A FENCE WILL BE NEEDED | | | NEAR OR ON TOP OF THE RETAINING WALL. | | | | | | TRACY WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
05-07-2019 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
05-07-2019 |
Time |
18:23 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
05-07-2019 |
Time |
18:26 |
Sent To |
|
|
| Notes |
| 2019-05-07 18:25:49 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT | | | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT | | | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR | | | MS,-PERMITS-APPLICATIONS | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. THE CITY?S VERTICAL DATUM IS NGVD 1929. THE CITY HAS | | | ALLOWED THE USE OF NAVD 1988 PROVIDED THE CONVERSION | | | EQUATION TO NGVD 1929 IS PROVIDED ON THE SHEET(S). | | | PROVIDE NAVD1988 TO NGVD1929 CONVERSION EQUATION ON THE | | | ENGINEERING PLANS. | | | | | | 2. END OF PAVERS IN THE ALLEY DO NOT ALIGN WITH THE | | | EXISTING ASPHALT ROADWAY. | | | | | | 3. CHECK SIDEWALK SLOPE BETWEEN NEW APARTMENTS AND BACK | | | OF SIDEWALKS ON ALPHA ST. AND MERCER ST. STEPS MAY BE | | | REQUIRED. | | | | | | 4. SHOW MILLING AND RESURFACING LIMITS FOR PAVEMENT | | | CUTS IN THE RIGHT-OF-WAY. | | | | | | 5. PIPE BETWEEN STRUCTURES S-204 AND S-102 MISLABELED | | | AS OUTFALL. | | | | | | 6. SHOW DRAINAGE FLOW ARROWS FOR SURFACE RUNOFF ON THE | | | CONCEPTUAL PG&D PLAN. | | | | | | 7. PROVIDE WATER QUALITY TREATMENT FOR THE PROPOSED | | | PARKING SPACES ON ALPHA ST. | | | | | | 8. PROVIDE CCTV OF THE STORMWATER PIPES IN MERCER AVE. | | | | | | 9. TRANSFER WATER SERVICES ON EXISTING WATER MAIN TO | | | NEW WATER MAIN ON ALPHA ST. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY | | | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. | | | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS | | | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE | | | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS | | | | | | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED | | | WITH THE ENGINEERING PERMIT APPLICATION. | | | | | | 3. PROVIDE A COPY OF THE SFWMD ERP PERMIT PRIOR TO | | | STARTING CONSTRUCTION. | | | | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
P |
Date |
06-25-2019 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
06-25-2019 |
Time |
07:30 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
06-26-2019 |
Time |
20:16 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
05-07-2019 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
05-07-2019 |
Time |
10:46 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2019-05-07 11:14:04 | 1. REPLAT OF PROPERTY WILL BE REQUIRED. | | | 2. IT APPEARS THAT THE WESTERN DRIVEWAY OFF THE ALLEY | | | CLIPS THE CORNER OF THE ADJACENT PROPERTY. | | | 3. MAINTENANCE AGREEMENT WILL BE REQUIRED FOR | | | IMPROVEMENTS WITHIN R/W AND IN THE ALLEY.. | | | 4. ACCESS EASEMENT MAY BE REQUIRED FOR NORTH BOUND | | | ENTRANCE. | | | 5. A PRIVATE UNDERGROUND UTILITY EASEMENT WILL BE | | | REQUIRED FOR DRAINAGE CROSSING THE ALLEY. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
2 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
06-18-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2019-06-18 15:08:19 | PASSED, WITH THE FOLLOWING CONDITIONS OF APPROVAL: | | | 1. CONSTRUCT BUFFERED BIKE LANES ON BOTH SIDES OF | | | MERCER AVENUE BETWEEN WILKINS AVENUE AND OLD OKEECHOBEE | | | ROAD PRIOR TO ISSUANCE OF THE FIRST CERTIFICATE OF | | | OCCUPANCY. | | | 2. COORDINATE WITH CITY ON STREETLIGHT DURING | | | PERMITTING. | | | | | | | | | SHING TSOI | | | CITY IN-HOUSE TRAFFIC CONSULTANT | | | 561-494-1141 | | | [email protected] | | | (IN-HOUSE ON TUESDAYS AND WEDNESDAYS) |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
04-30-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2019-04-30 17:23:12 | 1. IN THE TRAFFIC STUDY, INCLUDE TRIP DISTRIBUTION ON | | | CITY ROADWAYS WITHIN THE RADIUS OF INFLUENCE OF 0.5 | | | MILES. | | | 2. CONDUCT QUEUING ANALYSIS AT THE ALLEY/INTERNAL | | | EAST-WEST DRIVEWAY INTERSECTION TO VERIFY THE | | | NORTHBOUND QUEUE DOESN?T BACK UP ONTO ALPHA STREET. | | | 3. SHOW THE CURB RADII AT THE ALLEY/INTERNAL EAST-WEST | | | DRIVEWAY INTERSECTION. CONSIDER USING SMALLER CURB | | | RADII AT THE SOUTHEAST AND SOUTHWEST CORNERS. SERVICE | | | VEHICLES SHOULD BE ALLOWED TO USE ALL PAVEMENT AREAS. | | | 4. SHOW 20-FOOT VISIBILITY TRIANGLE AT THE CORNERS OF | | | ALPHA STREET AND ALLEY. | | | 5. PROVIDE SIDEWALK EASEMENT FOR THE PORTION OF | | | SIDEWALK WHICH IS OUTSIDE PUBLIC ROW, IF ANY. | | | 6. PROVIDE ACCESS EASEMENT FOR THE PORTION OF DRIVEWAY | | | WHICH IS OUTSIDE PUBLIC ROW BUT REQUIRED FOR ALLEY | | | ACCESS. | | | 7. PROVIDE TWO-WAY SIGN (W6-3) AT THE ENTRANCE OF | | | ALLEY. | | | 8. SHOW DRIVEWAYS AND CURB CUTS ON BOTH SIDES OF ALPHA | | | STREET AND MERCER AVENUE. | | | 9. ON EX1 AND EX2, SHOW DIMENSIONS OF THE GARBAGE | | | TRUCK. | | | 10. INCLUDE AUTOTURN EXHIBIT OF FIRE TRUCKS. | | | 11. PROVIDE BUFFERED BIKE LANES ON BOTH SIDES OF MERCER | | | AVENUE BETWEEN WILKINS AVENUE AND OLD OKEECHOBEE ROAD. | | | USE 6-FOOT BIKE LANE, AND 2-FOOT BUFFER WITH 10-FOOT | | | TRAVEL LANE. REMOVE NORTHBOUND LEFT-TURN LANE AT MERCER | | | STREET/OLD OKEECHOBEE ROAD. INCLUDE CROSS-SECTION OF | | | MERCER STREET. | | | 12. THE CURB RAMP AT THE NORTHWEST CORNER OF ALPHA | | | STREET/MERCER AVENUE IS DIFFERENT BETWEEN SHEET C1.0 | | | AND SP-1. PLEASE REVISE. | | | 13. INDICATE THE LOCATION OF THE PROPOSED BICYCLE | | | STORAGE ROOM ON THE SITE PLAN. | | | 14. INCLUDE THE REQUIRED AND PROPOSED BICYCLE PARKING | | | SPACES UNDER PARKING DATA ON THE SITE PLAN. | | | 15. MILL AND RESURFACE ALPHA STREET AND MERCER AVENUE | | | ADJACENT TO THE PROPERTY. | | | 16. PROVIDE STREET LIGHT ALONG MERCER AVENUE ADJACENT | | | TO THE PROPERTY. | | | 17. CONSIDER PROVIDING LOCATION FOR SHARED | | | MICROMOBILITY INSTEAD OF ?SKYBIKE? TYPE BIKE SHARING | | | SYSTEM. | | | | | | SHING TSOI | | | CITY IN-HOUSE TRAFFIC CONSULTANT | | | 561-494-1141 | | | [email protected] | | | (IN-HOUSE ON TUESDAYS AND WEDNESDAYS) |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
06-24-2019 |
|
|
Cont ID |
|
| Sent By |
pgreilic |
Date |
06-24-2019 |
Time |
10:38 |
Rev Time |
0.00 |
| Received By |
pgreilic |
Date |
06-24-2019 |
Time |
10:38 |
Sent To |
|
|
| Notes |
| 2019-06-24 10:38:54 | STAFF SUPPORTS THE INCLUSION OF AN AFFORDABLE HOUSING | | | COMPONENT INTO THE PROPOSED RESIDENTIAL PLANNED | | | DEVELOPMENT | | | | | | PAUL GREILICH, SENIOR PLANNER | | | 561-822-1443 | | | [email protected] |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
05-07-2019 |
|
|
Cont ID |
|
| Sent By |
pgreilic |
Date |
05-07-2019 |
Time |
15:24 |
Rev Time |
0.00 |
| Received By |
pgreilic |
Date |
05-07-2019 |
Time |
15:24 |
Sent To |
|
|
| Notes |
| 2019-05-07 15:25:15 | CASE NUMBER: PB1831 ? Z19040012 | | | PROJECT NAME: MERCER PARK RESIDENTIAL PLANNED | | | DEVELOPMENT | | | ADDRESS: 1315-1321 ALPHA STREET | | | | | | -- CONTACT PAUL GREILICH @ (561) 822-1443 | | | -- PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN | | | WRITTEN FORMAT. | | | -- WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF | | | ELEVEN (11) PAPER COPIES AND AN ELECTRONIC COPY IN | | | .PNG/.PDF FORMAT OF ALL PLANS. PLEASE NOTE THAT CHANGES | | | ON THE RESUBMITTED PLANS OR THE SUBMITTAL OF | | | INFORMATION/PLANS TO ADDRESS THE COMMENTS MAY RESULT IN | | | ADDITIONAL COMMENTS. | | | -- PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT | | | RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS | | | FROM THE DATE OF THESE COMMENTS/THE PPRC MEETING (BY | | | 7/8/19), THE CASE SHALL BE CONSIDERED WITHDRAWN. ANY | | | FURTHER ACTION SHALL REQUIRE A NEW DEVELOPMENT | | | APPLICATION. | | | -- PUBLIC HEARING NOTIFICATION SIGNAGE SHALL BE POSTED | | | IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION | | | 94-39(I)(5) OF THE ZONING AND LAND DEVELOPMENT | | | REGULATIONS. | | | | | | 1.) PROVIDE LETTERS FROM ALL OF THE FOLLOWING PUBLIC | | | UTILITIES CONFIRMING THAT THE PROPOSED PROJECT DOES NOT | | | ENCROACH INTO THEIR EASEMENTS OR OTHERWISE INTERFERE | | | WITH THE PROVISION OF THEIR SERVICES: AT&T, FPU, FPL, | | | AND COMCAST. | | | 2.) ALL PRIVATE DEVELOPMENT PROJECTS, INCLUDING NEW | | | CONSTRUCTION, OR THE RENOVATION OR IMPROVEMENT OF AN | | | EXISTING BUILDING, WHERE THE TOTAL CONSTRUCTION COSTS | | | ARE EQUAL OR GREATER THAN $750,000 IS SUBJECT TO THE | | | ART IN PUBLIC PLACES REQUIREMENTS OF CHAPTER 78, | | | ARTICLE V, OF THE CITY?S CODE OF ORDINANCES. CONTACT | | | SYBILLE WELTER @ 561-822-1521 OR [email protected] FOR | | | ADDITIONAL INFORMATION | | | 3.) A REPLAT OF THE SUBJECT PROPERTIES WILL BE REQUIRED | | | 4.) STAFF SUPPORTS THE INCLUSION OF AN AFFORDABLE | | | HOUSING COMPONENT INTO THE PROPOSED RESIDENTIAL PLANNED | | | DEVELOPMENT | | | 5.) THE OPEN SPACE/PARK AREA SHOULD BE OVERALL ENHANCED | | | AND REWORKED TO ELIMINATE ANY DEAD END PATHS. | | | 6.) ADDITIONAL SCREENING SHOULD BE PROVIDED BETWEEN THE | | | PROPERTIES ADJACENT TO THE NORTH, STAFF SUPPORTS | | | ALTERNATIVE MATERIAL TO PVC | | | 7.) NARROW 24 FOOT DRIVE AISLES TO 20 FEET AND TIGHTEN | | | CURB RADII. DOING SO WILL INCREASE LANDSCAPING IN | | | TERMINAL ISLANDS AND SLOW VEHICLES TO HELP MINIMIZE | | | CONFLICTS AT PROPOSED INTERSECTIONS | | | 8.) STAFF SUPPORTS REDUCING THE DEPTH OF PARKING SPACES | | | BY INCLUDING A 2-FOOT GRASS OVERHANG. THE CURB WOULD | | | FUNCTION AS WHEEL STOPS. ALSO CONSIDER THE INCLUSION OF | | | SMALL CAR SPACES TO REDUCE OVERALL IMPERVIOUS SURFACE | | | AREA | | | 9.) EXPAND SIDEWALK BETWEEN REAR OR BUILDINGS AND | | | PARKING AREA TO, SUGGESTED EIGHT FEET TO INCREASE SPACE | | | BETWEEN VEHICLES AND REAR BUILDING OVERHANGS | | | 10.) REVISE ARCHITECTURAL PLANS, PARTICULARLY ALONG | | | ALPHA STREET AND MERCER AVE. SPECIFICALLY, FIRST FLOOR | | | ENTRIES SHOULD BE RAISED TO HAVE STEPS AND FRONT DOORS | | | RATHER THAN SLIDING DOORS | | | 11.) ADD PEDESTRIAN-SCALE LIGHTING ALONG ALPHA STREET | | | AND IN THE PARK/OPEN SPACE AREA | | | 12.) PROVIDE CITY-STANDARD BIKE RACK DETAIL | | | | | | |
|
|
| |