Plan Review Details - Project Z19020006
Plan Review Stops For Project Z19020006
Review Stop L LANDSCAPING
Rev No 2 Status P Date 05-23-2019 Cont ID  
Sent By rcaranci Date 05-23-2019 Time 09:33 Rev Time 0.00
Received By rcaranci Date 05-23-2019 Time 09:33 Sent To  
Notes
2019-05-23 09:35:06COMENTS ADDRESSED WERE FROM LANDSCAPE INSPECTION
 PUNCHLIST.

Review Stop L LANDSCAPING
Rev No 1 Status F Date 03-12-2019 Cont ID  
Sent By rcaranci Date 03-12-2019 Time 11:09 Rev Time 0.00
Received By rcaranci Date 03-12-2019 Time 11:09 Sent To  
Notes
2019-03-12 11:09:50FROM: RAY CARANCI, LANDSCAPE PLANNER
 PROJECT: BRAMAN MOTORCARS Z19020006 MINOR AMENDMENT
 MARCH 12, 2019
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. THE TERMINAL ISLAND ON THE SOUTH SIDE OF BUILDING
 WEST OF THE BAY DOOR DOES NOT CONTAIN THE REQUIRED 2
 PALMS.
 2. ADD THE 3 TRANSPLANTED SPINDLE PALMS TO THE PLAN.
 3. ADJUST THE LOCATIONS OF THE CRAPE MYRTLE STANDARDS
 ALONG OKEECHOBEE TO AVOID CONFLICTS WITH THE LIGHT
 POLES.
 COMMENTS ARE BASED ON THE LANDSCAPE INSPECTION PUNCH
 LIST FOR PHASE 4.
  

Review Stop STORM STORMWATER
Rev No 1 Status P Date 02-26-2019 Cont ID  
Sent By tward Date 02-26-2019 Time 16:12 Rev Time 0.00
Received By tward Date 02-26-2019 Time 16:17 Sent To  
Notes
2019-02-26 16:17:06I SPOKE WITH PAUL BURI/SIMMONS AND WHITE REGARDING THE
 CIVIL PLAN CHANGES DESCRIBED IN UDKS' 2/6/2019
 JUSTIFICATION STATEMENT. THE DRAINAGE REVISIONS
 OCCURRED IN THE PARKING LOT SOUTH OF THE PARKING GARAGE
 IN THE EAST SIDE OF THE SITE. THESE CHANGES ARE WITH
 RESPECT TO THE INTERNAL STORMWATER MANAGEMENT SYSTEM
 AND I HAVE NO COMMENT ON THE CHANGES.
  
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]

Review Stop Z ZONING
Rev No 2 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By eschneid Date 05-22-2019 Time 08:55 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 04-11-2019 Cont ID  
Sent By eschneid Date 04-11-2019 Time 13:58 Rev Time 1.00
Received By eschneid Date 04-11-2019 Time 13:58 Sent To  
Notes
2019-04-11 14:31:11CASE NO. PB 1222Q
 BRAMAN BENTLEY PERMIT BASED CHANGES
 2901 OKEECHOBEE BOULEVARD
  
 - CONTACT ERIC SCHNEIDER @ (561) 822-1446
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF FIVE
 (5) PAPER COPIES AND AN ELECTRONIC COPY IN .PDF FORMAT
 OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS
 TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL
 COMMENTS.
  
 - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT
 RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS
 FROM THE DATE OF THESE COMMENTS MEETING (BY JUNE 11,
 2019), THE CASE SHALL BE CONSIDERED WITHDRAWN. ANY
 FURTHER ACTION SHALL REQUIRE A NEW DEVELOPMENT
 APPLICATION.
  
 - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($60).
  
 1) SIGNS D-1 AND D-2 ARE MISLABELED ON SHEET SP-1 -
 THEY ARE FLIPPED, SEE THE SIGN PLAN.
  
 2) PROVIDE A DETAIL OF THE PROPOSED HARVEY BLOWER
 SCREENING FENCE.
  
 3) ADD THE CAR WASH, INCLUDING COMPRESSOR AREA, AS A
 LINE ITEM ON THE BUILDING AREA BREAKDOWN TABLE. NOTE:
 THIS SHOULD HAVE BEEN PREVIOUSLY REFLECTED ON THE
 PLANS.
  
 4) AN ENGINEERING (STORMWATER) REVIEW FEE OF $212 IS
 REQUIRED.
  
  

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved