Plan Review Details - Project Z19010032
Plan Review Stops For Project Z19010032
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By rcaranci Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop L LANDSCAPING
Rev No 2 Status P Date 06-19-2019 Cont ID  
Sent By rcaranci Date 06-19-2019 Time 14:09 Rev Time 0.00
Received By rcaranci Date 06-03-2019 Time 14:08 Sent To  
Notes
2019-06-19 14:09:59SATISFIED. ARTIFICIAL TURF DOES NOT MEET CODE
 REQUIREMENT OF NOT BEING IN VIEW FROM THE ROAD OR
 STREET.

Review Stop L LANDSCAPING
Rev No 1 Status F Date 04-11-2019 Cont ID  
Sent By rcaranci Date 04-11-2019 Time 10:22 Rev Time 0.00
Received By rcaranci Date 04-11-2019 Time 10:22 Sent To  
Notes
2019-04-11 10:23:06ARTIFICIAL TURF DOES NOT MEET CODE REQUIREMENT OF NOT
 BEING IN VIEW FROM THE ROAD OR STREET.
  

Review Stop PARK PARKING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop POLICE POLICE
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PW PUBLIC WORKS
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop STORM STORMWATER
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop SURVEY SURVEYING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status P Date   Cont ID  
Sent By   Date 06-18-2019 Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
2019-06-18 11:54:13NO COMMENTS ON THE ELECTRONIC SIGNAGE. HOWEVER, THE
 FOLLOWING RELATED TO OFF-SITE IMPROVEMENTS SHOULD BE
 ADDRESSED DURING PERMITTING:
 1. THE TAPER FOR THE BIKE LANE AND SIDEWALK NEAR THE
 EGRESS ON OKEECHOBEE BOULEVARD SHOULD BE MOVED CLOSER
 TO TAMARIND AVENUE, AND A LONGER TAPER MATCHING THE
 DESIGN SPEED OF 15 MPH (FOR BIKE) SHOULD BE USED.
 2. THE BIKE LANE IS ONE-WAY WESTBOUND. HOWEVER, SHEET
 RPD-2 SHOWS BIKE STENCILS FACING THE WRONG DIRECTION.
 EACH BIKE STENCIL SHOULD ALSO INCLUDE AN ARROW
 INDICATING THE TRAVEL DIRECTION. ALSO, A BIKE LANE END
 SIGN (R3-17 WITH R3-17BP) SHOULD BE PROVIDED TO
 INDICATE THE END OF THE BIKE LANE NEAR TAMARIND AVENUE.
  
  
 SHING TSOI
 CITY IN-HOUSE TRAFFIC CONSULTANT
 561-494-1141
 [email protected]
 (IN-HOUSE ON TUESDAYS AND WEDNESDAYS)

Review Stop Z ZONING
Rev No 2 Status F Date 04-18-2019 Cont ID  
Sent By elevesqu Date 04-18-2019 Time 15:45 Rev Time 0.00
Received By elevesqu Date 04-18-2019 Time 15:44 Sent To  
Notes
2019-04-18 15:45:551. SATISFIED. PLEASE PROVIDE A FULL SURVEY OF EXISTING
 TREES AND A TREE DISPOSITION PLAN.
 2. SATISFIED. PLEASE PROVIDE PLAN SHOWING ANY PROPOSED
 INFILL AND STABILIZATION OF EXISTING DRY DETENTION
 AREA.
 3. NOT SATISFIED. THE PROPOSED SIGNAGE EXCEEDS THE
 PERMITTED 40 LINEAR FEET PER AVENUE STREET FRONTAGE.
 THE SIGN SHALL BE MEASURED BY COMBINING THE INDIVIDUAL
 SECTIONS.
 4. NOT SATISFIED. THE PROPOSED SIGNAGE EXCEEDS THE
 TOTAL 400 SF PERMITTED FOR AVENUE STREET FRONTAGE. THE
 SIGN SHALL BE MEASURED BY COMBINING THE INDIVIDUAL
 SECTIONS.
 5. NOT SATISFIED. PLEASE PROVIDE PROPOSED PAVER
 MATERIAL AND OTHER HARDSCAPE FEATURE DETAIL, INCLUDING
 COLOR SPECS.
 PLEASE INCLUDE COLOR DETAIL OF HARDSCAPE MATERIALS.
 6. ONGOING. PLEASE CLARIFY LOCATION OF SIDEWALK AND
 BICYCLE PATH AND CLEARLY INDICATE PROPOSED PATHWAY FOR
 BOTH ON THE PLAZA PLAN.
 PLEASE UPDATE AS NEEDED WITH CHANGES TO THE ROWS OF
 PAVERS (SEE NEW COMMENT #10)
 7. ONGOING. A LIGHT POLE IS LOCATED IN THE MIDDLE OF
 THE PROPOSED BICYCLE PATH. PLEASE CONSIDER RELOCATION
 OF THIS CONCRETE POLE FOR SAFETY.
 8. ONGOING. PLEASE NOTE, A SEPARATE SIGN PERMIT WILL BE
 REQUIRED, FOLLOWING ALL REGULATIONS OF SECTION
 94-110(G).
  
 NEW COMMENTS 4/18/2019- ADDITIONAL COMMENTS FROM REVIEW
 WITH ENGINEERING DEPARTMENT
  
 9. ARTIFICIAL TURF CANNOT BE SEEN FROM THE ROW. PLEASE
 REMOVE.
 10. PLEASE REMOVE THE FIRST ROW OF PAVERS TO ALLOW FOR
 A CLEAR SIDEWALK PATH FOR PEDESTRIANS.
 11. PLEASE PROVIDE AN ENGINEERING SECTION FROM THE S
 TAMARIND AVENUE MEDIAN CROSSING EAST OVER TO BEHIND THE
 PROPOSED SIGN (INTO DRY DETENTION AREA), SPECIFICALLY
 INDICATING DRAINAGE.
 12. PLEASE EXTEND THE CURB AT S TAMARIND AVENUE AND
 OKEECHOBEE BOULEVARD WHERE THE DIAGONAL STRIPING IS
 PROPOSED.
 13. PLEASE EXTEND THE MEDIAN ON S TAMARIND AVENUE TO
 CREATE A PEDESTRIAN REFUGE AREA IN THE CROSSWALK.
 14. PLEASE KEEP THE CORNER OF S TAMARIND AND OKEECHOBEE
 BOULEVARD CLEAR OF LANDSCAPING AND GRASS TO ALLOW FOR
 PEDESTRIAN CROSSING AT THE CORNER. THE SOD CAN REMAIN
 NORTH OF THE CROSSWALK ALONG S TAMARIND AVENUE,
 MAINTAINING AN 8 FOOT PATHWAY.
 15. PLEASE REMOVE THE TRUNCATED DOME AT CROSSINGS FOR
 THE BICYCLE PATH (LEAVE FOR PEDESTRIAN SIDEWALK)
 16. PLEASE REMOVE PAVERS FROM THE PORTION OF CROSSWALK
 THAT IS BIKE PATH (ALONG OKEECHOBEE BOULEVARD) AND
 UTILIZE GREEN PAINT TO SIGNIFY BICYCLE PATH CROSSING.
 17. PLEASE MAINTAIN A 2% SLOPE FROM THE STOP BAR TO THE
 ROAD AT THE RIGHT-TURN EXIT DRIVEWAY ON OKEECHOBEE
 BOULEVARD. PLEASE SHOW ON SHEET PD-4.
 18. PLEASE INDICATE THE LIMIT OF MILLING AND
 RESURFACING.
  

Review Stop Z ZONING
Rev No 1 Status F Date 02-21-2019 Cont ID  
Sent By elevesqu Date 02-21-2019 Time 14:50 Rev Time 0.00
Received By elevesqu Date 02-21-2019 Time 14:50 Sent To  
Notes
2019-02-21 14:50:091. PLEASE PROVIDE A FULL TREE SURVEY AND A TREE
 DISPOSITION PLAN.
 2. PLEASE PROVIDE A PLAN SHOWING ANY PROPOSED INFILL
 AND STABILIZATION OF EXISTING DRY DETENTION AREA, THAT
 IS BEING IMPACTED BY PLAZA AND PROPOSED SIGN.
 3. THE PROPOSED SIGNAGE EXCEEDS THE PERMITTED 40 LINEAR
 FEET PER AVENUE STREET FRONTAGE. THE SIGN SHALL BE
 MEASURED BY COMBINING THE INDIVIUDAL SECTIONS.
 4. THE PROPOSED SIGNAGE EXCEEDS THE TOTAL 400 SF
 PERMITTED FOR AVENUE STREET FRONTAGE. THE SIGN SHALL BE
 MESURED BY COMBINING THE INDIVIDUAL SECTIONS.
 5. PLEASE PROVIDE PROPOSED PAVER MATERIAL AND OTHER
 HARDSCAPE DETAIL, INCLUDING COLOR SPECS.
 6. PLEASE CLARIFY THE LOCATION OF THE SIDEWALK AND
 BICYCLE PATH AND CLEARLY INDICATE PROPOSED PATHWAY FOR
 BOTH ON THE PLAZA PLAN.
 7. A LIGHT POLE IS LOCATED IN THE MIDDLE OF THE
 PROPOSED BICYCLE PATH. PLEASE RELOCATE THIS CONCRETE
 POLE.
 PLEASE NOTE, A SEPARATE SIGN PERMIT WILL BE REQUIRED,
 FOLLOWING ALL REGULATIONS OF SECTION 94-110(G).
  
 LIZ LEVESQUE, URBAN DESIGN PLANNER
 [email protected]
 561 822 1426