Plan Review Details - Project Z18110022
| Plan Review Stops For Project Z18110022 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
12-11-2018 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
12-11-2018 |
Time |
18:10 |
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
12-11-2018 |
Time |
18:10 |
Sent To |
|
|
| Notes |
| 2018-12-11 18:20:18 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. IT IS NOTED THAT A PREVIOUS | | | DESIGN FOR THIS PROJECT WAS REVIEWED IN JANUARY AND MAY | | | 2018. THE FOLLOWING COMMENTS ARE TO BE ADDRESSED FOR | | | THE BUILDING PERMIT APPLICATION. | | | | | | 2. FLOOD ZONE. ACCORDING TO THE ADOPTED FLOOD INSURANCE | | | RATE MAPS (FIRMS), THE PROPOSED BUILDING IS IN FLOOD | | | ZONE AE, WITH A BASE FLOOD ELEVATION OF 12.1 FT NAVD. | | | THE FIRST FLOOR OF THE BUILDING AND ALL ASSOCIATED | | | MECHANICAL EQUIPMENT (CHILLERS, GENERATORS ETC.) SHALL | | | BE 24 INCHES (FREEBOARD) ABOVE THE BASE FLOOD | | | ELEVATION. | | | | | | 3. VAN ACCESSIBLE PARKING SPACES. WHEN SUBMITTED FOR | | | PERMIT THE PLANS SHALL BE MARKED TO SHOW WHICH | | | ACCESSIBLE PARKING SPACES ARE DESIGNATED AS VAN | | | ACCESSIBLE. PER SECTION 208.2.4 OF FLORIDA | | | ACCESSIBILITY CODE, ONE IN EVERY SIX REQUIRED | | | ACCESSIBLE SPACES (AT LEAST ONE) IN A PARKING | | | STRUCTURE, SHALL BE ?VAN ACCESSIBLE? AND DESIGNED IN | | | ACCORDANCE WITH SECTION OF 502 OF FLORIDA ACCESSIBILITY | | | CODE (VERTICAL CLEARANCE NOT LESS THAN 98 INCHES AT | | | SPACE AND VEHICULAR ACCESS ROUTE) | | | | | | 4. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 5. BUILDING LOCATION RELATIVE TO THE PROPERTY LINE AND | | | OTHER STRUCTURES. WHEN SUBMITTED FOR BUILDING PERMIT, | | | COMPLIANCE WITH ALL BUILDING SEPARATION, PERCENTAGE OF | | | OPENINGS AND OPENING PROTECTIVE REQUIREMENTS OF | | | CHAPTERS 6 AND 7 OF THE FLORIDA BUILDING CODE SHALL BE | | | VERIFIED. | | | | | | 6. ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE DOES | | | NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL OPENINGS TO | | | MEET THE DEFINITION OF AN OPEN PARKING GARAGE, IT WILL | | | BE CONSIDERED AN ENCLOSED PARKING GARAGE AND MUST HAVE | | | EXHAUST SYSTEMS. THE EXHAUST SYSTEMS SHALL BE DESIGNED | | | TO MINIMIZE NOISE LEVELS USING INLINE FAN SILENCERS OR | | | OTHER APPROVED METHODS. | | | | | | 7. GREASE INTERCEPTOR. A GREASE INTERCEPTOR WILL BE | | | REQUIRED. PLEASE CONTACT JEFFREY ODOMS, UTILITIES O&M | | | SUPERINTENDENT, PUBLIC UTILITIES DEPARTMENT, FATS OILS | | | AND GREASE DIVISION, AT (561) 822-2172, OR BY EMAIL: | | | [email protected] | | | | | | 8. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS, | | | GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND | | | OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS, | | | SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC. | | | | | | 9. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT | | | WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL | | | HAVE A SEPARATE ADDRESS. FOR STREET ADDRESSING, CONTACT | | | MICHAEL ORIO, GIS SUPPORT SPECIALIST, AT (561) 494 | | | 1080, OR BY EMAIL: [email protected] | | | | | | 10. THIS PROJECT WILL BE SUBJECT TO ART IN PUBLIC | | | PLACES (AIPP) ASSESSMENT. FOR ADVICE ON THE PROVISION | | | OF PUBLIC ARTWORK IN LIEU OF THE AIPP ASSESSMENT, | | | CONTACT SYBILLE WELTER, ART IN PUBLIC PLACES | | | COORDINATOR, AT (561) 822-1521, OR BY EMAIL: | | | [email protected] | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
12-10-2018 |
|
|
Cont ID |
|
| Sent By |
hmtribou |
Date |
12-10-2018 |
Time |
17:22 |
Rev Time |
0.00 |
| Received By |
|
Date |
01-11-2019 |
Time |
08:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
3 |
Status |
P |
Date |
02-07-2019 |
|
|
Cont ID |
|
| Sent By |
RRossano |
Date |
02-07-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
02-07-2019 |
Time |
|
Sent To |
|
|
| Notes |
| 2019-02-07 10:41:38 | PASSED WITH CONDITION: REPLACE EXISTING 8 INCH SANITARY | | | SEWER ADJACENT TO AREAS IN PROXIMITY OF PROPOSED | | | UTILITIES AND ALSO IN ANY OTHER AREAS DAMAGED OR | | | DISTURBED BY CONSTRUCTION, WHICH MAY INCLUDE THE ENTIRE | | | FRONTAGE ON CLARE AVE. FROM WILKINS AVE. TO BLANCHE | | | STREET. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | | | | RICK ROSSANO | | | PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1098 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 246-9525 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | MANNY GONZALEZ | | | SENIOR ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 644-7301 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | CENTRAL OPERATIONS CENTER (DISPATCH): | | | 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC | | | UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210 |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
P |
Date |
01-17-2019 |
|
|
Cont ID |
|
| Sent By |
RRossano |
Date |
01-17-2019 |
Time |
15:23 |
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2019-01-17 10:23:03 | AS A CONDITION OF SITE PLAN APPROVAL, IT IS UNDERSTOOD | | | THAT THE DEVELOPER WILL COMPROMISE AND REPLACE | | | PORTIONS, IF NOT ALL, OF THE EXISTING 8 INCH DIAMETER | | | SANITARY SEWER LINE PARALLEL TO CLAIRE AVE. APPROXIMATE | | | LENGTH OF 750 LINEAR FEET AS SHOWN ON SHEET C2.1. | | | COMMENT PER MANNY GONZALEZ, SENIOR ENGINEERING PROJECT | | | COORDINATOR, ENGINEERING SERVICES DEPARTMENT, | | | 561-494-1085. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | | | | RICK ROSSANO | | | PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1098 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 246-9525 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | MANNY GONZALEZ | | | SENIOR ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 644-7301 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
12-06-2018 |
|
|
Cont ID |
|
| Sent By |
RRossano |
Date |
12-06-2018 |
Time |
|
Rev Time |
|
| Received By |
rrossano |
Date |
12-06-2018 |
Time |
|
Sent To |
I |
|
| Notes |
| 2018-12-06 12:05:39 | PROVIDE OVERALL UTILITY PLANS. | | | PROVIDE LOS (LEVEL OF SERVICE) LETTER. | | | | | | THE FOLLOWING COMMENTS ARE INCLUDED FOR YOUR GENERAL | | | INFORMATION AND USE. THEY MAY NOT BE SITE-SPECIFIC, BUT | | | WILL SOON BE ADDED TO CITY OF WEST PALM BEACH | | | DEVELOPMENT PERMIT APPLICATIONS. | | | | | | PROVIDE SWPPP (STORMWATER POLLUTION PROTECTION PLAN) | | | SHOWING: | | | A) WHERE SILT SCREENS WILL BE INSTALLED | | | B) SHOW THE PROTECTION OF ALL ON-SITE CATCH BASINS | | | C) SHOW PROTECTION OF ALL OFF-SITE CATCH BASINS | | | D) INCLUDE DETAILS AS TO THE TYPE OF PROTECTION USED ON | | | THE CATCH BASINS | | | E) SHOW HOW SITE DIRT WILL NOT BE TRACKED INTO THE | | | ROADS | | | HTTP://WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES/DOCS/ | | | CONST_ACTIVITY.PDF | | | HTTP://WWW.PBCO-NPDES.ORG/CONSTRUN.HTML | | | HTTP://WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES/FAQS. | | | HTM | | | | | | THE CITY OF WEST PALM BEACH HAS A NUMBER OF REGULATIONS | | | AND PERMIT REQUIREMENTS WHICH DIRECTLY AFFECT THE | | | DEVELOPMENT AND INSTALLATION OF WATER AND WASTEWATER | | | UTILITIES WITHIN THE CITY. PLEASE SEE DEVELOPMENT | | | PERMIT SUBMITTAL REQUIREMENTS AT THE LINK BELOW: | | | HTTP://WPB.ORG/CMSPAGES/GETAMAZONFILE.ASPX?PATH=~\WPB_W | | | EBSITE\MEDIA\ENGINEERING\DEVELOPMENT-APPLICATION-FULL-P | | | ACKAGE_2016.PDF&HASH=7BD4DD7EB6115181D8C5977BCC02A97B19 | | | 60045731D3658206F27451722716EF | | | THIS AND OTHER RELATED ENGINEERING DOCUMENTS CAN BE | | | FOUND HERE: | | | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR | | | MS,-PERMITS-APPLICATIONS | | | | | | CODE OF ORDINANCES, CITY OF WEST PALM BEACH, FLORIDA, | | | CODIFIED THROUGH ORD. NO. 4183-08, ADOPTED SEPT. 22, | | | 2008. (SUPPLEMENT NO. 18) | | | CHAPTER 90 UTILITIES, ARTICLE I. IN GENERAL, | | | SEC. 90-7. POLICY REGARDING EXTENSION OF WATER OR SEWER | | | SERVICE FACILITIES OF THE CITY. | | | | | | THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE | | | CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY | | | BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS, | | | BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION. | | | | | | PROVIDE CALCULATIONS OF EXISTING AND PROPOSED DEMANDS | | | FOR WATER & SEWER (AVERAGE, MAXIMUM AND PEAK) AND FIRE | | | FLOW DEMANDS. CALCULATIONS SHALL BE PER FAC 64E-6 FOR | | | SEWER AND PER FAC 64-E.008 FOR WATER. | | | | | | PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER ALONG | | | ENTIRE PROJECT FRONTAGE. | | | | | | PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY OF | | | WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC RIGHT | | | OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF YOUR | | | PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE | | | MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL | | | IN THE WPB ENGINEERING SERVICES DEPARTMENT AT | | | [email protected] OR 561-494-1079 FOR FURTHER | | | ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION | | | ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD | | | SURVEY, POT-HOLING, SOFT DIGS ETC. | | | | | | AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH | | | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, | | | STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR | | | MORE INFORMATION, REFER TO THE LINK BELOW: | | | HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI | | | CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL | | | | | | PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS OF | | | ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES, | | | INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND | | | SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES, | | | METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE | | | SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING | | | GRADES, PIPES SIZES, MATERIALS, ELEVATIONS, | | | ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL | | | INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER | | | LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE | | | PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN | | | VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. | | | ADDITIONALLY, PLAN VIEW SHALL SHOW ALL EXISTING AND | | | PROPOSED UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER | | | OPTIC, ELECTRIC, GAS, AND CABLEVISION & | | | TELECOMMUNICATION FACILITIES LOCATED ON THE | | | RIGHT-OF-WAY. | | | | | | PROVIDE PROFILE VIEW OF ALL UTILITY CONFLICTS WITHIN | | | CITY OF WPB RIGHT OF WAY. | | | | | | CUT AND CAP ANY UTILITIES NOT BEING USED. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | | | | RICK ROSSANO | | | PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1098 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 246-9525 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | MANNY GONZALEZ | | | SENIOR ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 644-7301 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
02-05-2019 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
02-05-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
02-05-2019 |
Time |
14:20 |
Sent To |
|
|
| Notes |
| 2019-02-05 14:27:26 | 3RD REVIEW RESPONSE | | | | | | | | | AFTER A REVIEW OF THE PPRC INFORMATION PACKET AND | | | RESPONSE LETTER DATED FEBRUARY 4, 2019, FROM HEATHER | | | DANFORTH, SENIOR PLANNER, THE PREVIOUSLY SUBMITTED FIRE | | | PREVENTION BUREAU COMMENTS HAVE BEEN ADDRESSED. | | | | | | HOWEVER, THE LOCATION AND DELINEATION OF A DEFINITIVE | | | FIRE LANE WAS NOT CLEARLY INDICATED OF THE SUBMITTED | | | PLAN. ADDITIONAL COMMUNICATION WITH THE OFFICE OF THE | | | FIRE MARSHAL IS STRONGLY ENCOURAGED TO AVOID | | | CONSTRUCTION DELAYS OR UNNECESSARY WORK. I HAVE | | | COMMUNICATED BY EMAIL WITH TODD MCLEOD, P.E., ON THIS | | | ISSUE TO MOVE THIS PROJECT FORWARD AND WORK THE | | | SPECIFIC LOCATIONS COLLECTIVELY BEFORE CONSTRUCTION. | | | | | | ADDITIONALLY, IT WAS BROUGHT TO MY ATTENTION THAT THE | | | FIRE HYDRANT NEAR THE PARK AREA IS IN NEED OF | | | RELOCATION. THE RELOCATION OF THE FIRE HYDRANT SHOWN ON | | | THE REVISED CIVIL IS ACCEPTABLE. THE LOCATION OF THE | | | REVISED FDC/DDCV IN THE PARK IS NOT AND NEEDS TO BE | | | RELOCATED COLLECTIVELY AS NOTED ABOVE. | | | | | | THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT DOES | | | NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT | | | THE APPROPRIATE TIME AND IN ACCORDANCE WITH THE | | | REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | WEST PALM BEACH FIRE RESCUE | | | 561-804-4709 | | | [email protected] |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
01-17-2019 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
01-17-2019 |
Time |
15:13 |
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
01-17-2019 |
Time |
15:02 |
Sent To |
|
|
| Notes |
| 2019-01-17 15:13:40 | 2ND REVIEW RESPONSE | | | | | | | | | AFTER A REVIEW OF THE PPRC INFORMATION PACKET AND | | | RESPONSE LETTER DATED JANUARY 7, 2019, FROM HEATHER | | | TRIBOU, SENIOR PLANNER, THE PREVIOUSLY SUBMITTED FIRE | | | PREVENTION BUREAU COMMENTS HAVE BEEN ADDRESSED. | | | | | | HOWEVER, THE LOCATION AND DELINEATION OF A DEFINITIVE | | | FIRE LANE WAS NOT CLEARLY INDICATED OF THE SUBMITTED | | | PLAN. ADDITIONAL COMMUNICATION WITH THE OFFICE OF THE | | | FIRE MARSHAL IS STRONGLY ENCOURAGED TO AVOID | | | CONSTRUCTION DELAYS OR UNNECESSARY WORK. | | | | | | ADDITIONALLY, IT WAS BROUGHT TO MY ATTENTION THAT THE | | | FIRE HYDRANT NEAR THE PARK AREA IS IN NEED OF | | | RELOCATION. THE RELOCATION OF THE FIRE HYDRANT SHALL BE | | | CLOSELY COORDINATED WITH THE OFFICE OF THE FIRE | | | MARSHAL, CITY UTILITIES DEPARTMENT AND CITY ENGINEERING | | | SERVICES. | | | | | | THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT DOES | | | NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT | | | THE APPROPRIATE TIME AND IN ACCORDANCE WITH THE | | | REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | WEST PALM BEACH FIRE RESCUE | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
12-04-2018 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
12-04-2018 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
12-04-2018 |
Time |
10:51 |
Sent To |
|
|
| Notes |
| 2018-12-04 12:21:31 | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, | | | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM | | | BEACH FIRE RESCUE. | | | | | | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE | | | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. | | | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS | | | ARE SUBMITTED FOR PERMIT. | | | | | | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE | | | PROPOSED PROJECT. | | | | | | 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY | | | WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE | | | PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A | | | PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED | | | TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN | | | STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY | | | MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER | | | PROTECTION. | | | | | | 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY | | | IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING | | | ALL CONSTRUCTION ACTIVITIES. | | | | | | 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM | | | ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION. | | | ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND | | | AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT | | | WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS. | | | | | | 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE | | | REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE | | | ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS. | | | | | | 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH | | | THE 6TH EDITION OF THE FLORIDA FIRE PREVENTION CODE, | | | INCLUDING, BUT NOT LIMITED TO, NFPA 101, CHAPTER 30, | | | NEW APARTMENT BUILDINGS, AND ALL ASSOCIATED FIRE CODES. | | | | | | THERE ARE MULTIPLE OCCUPANCIES INDICATED WITH THE | | | PROPOSED PROJECT. PER NFPA 101, CHAPTER 6, OCCUPANCY | | | CLASSIFICATION WILL THE OCCUPANCIES BE SEPARATED OR | | | MIXED? CAREFUL CONSIDERATION SHOULD BE GIVEN TO MIXED | | | OCCUPANCIES AS THE MOST STRINGENT OCCUPANCY WOULD | | | APPLY. | | | | | | 6. ALL PARKING STRUCTURES SHALL COMPLY WITH NFPA 88A, | | | PARKING STRUCTURES AND NFPA 101, AND ASSOCIATED FIRE | | | CODES. | | | | | | 7. A NFPA 13 COMPLIANT FIRE SPRINKLER SYSTEM AND NFPA | | | 14 COMPLIANT WET STANDPIPE SYSTEM ARE REQUIRED FOR THIS | | | STRUCTURE. TEMPORARY STANDPIPES ARE REQUIRED WHEN THE | | | BUILDING REACHES THREE LEVELS OR THIRTY FEET WHILE | | | BEING CONSTRUCTED. | | | | | | SEPARATE SHOP DRAWINGS, ARE REQUIRED TO BE SUBMITTED, | | | REVIEWED AND APPROVED BY THE FIRE PREVENTION BUREAU | | | PRIOR TO ANY INSTALLATION. | | | | | | PER FLORIDA ADMINISTRATIVE CODE SECTION 61G15-32.004, | | | FIRE PROTECTION ENGINEERING DOCUMENTS SHALL INCLUDE THE | | | POINT OF SERVICE FOR THE WATER SUPPLY, A LIST OF | | | APPLICABLE NFPA STANDARDS APPLICABLE TO THE PROJECT, | | | CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR | | | AREA, SUPPRESSION SYSTEM TYPE, DESIGN DENSITIES, WATER | | | SUPPLY DATA (FIRE PUMP DATA, HYDRANT FLOW TEST DATA) | | | AND ANY PERFORMANCE BASED INFORMATION SUCH AS | | | PRE-ENGINEERED SYSTEMS. | | | | | | FOR ANY PROPOSED FIRE PUMP(S) , WHAT IS(ARE) THE | | | PRIMARY AND SECONDARY POWER SOURCES? | | | | | | 8. A NFPA 72 COMPLIANT MONITORED FIRE ALARM SYSTEM IS | | | REQUIRED FOR THIS STRUCTURE. SEPARATE SHOP DRAWINGS, | | | ARE REQUIRED TO BE SUBMITTED, REVIEWED AND APPROVED BY | | | THE FIRE PREVENTION BUREAU PRIOR TO ANY INSTALLATION. | | | | | | CONSIDERATION SHOULD BE GIVEN TO HAVING SEPARATE FA | | | ZONES/PANELS DUE TO THE SEPARATE OCCUPANCIES. | | | | | | 9. ALL NEW ELEVATORS SHALL CONFORM TO THE FIRE | | | FIGHTER?S EMERGENCY OPERATIONS REQUIREMENTS OF ASME | | | A17.1/CSA B44, SAFETY CODE FOR ELEVATORS. | | | | | | ANY BUILDING THAT IS MORE THAN THREE STORIES HIGH OR IN | | | WHICH THE VERTICAL DISTANCE BETWEEN THE BOTTOM TERMINAL | | | LANDING AND THE TOP TERMINAL LANDING EXCEEDS 25 FEET | | | MUST BE CONSTRUCTED TO CONTAIN AT LEAST ONE PASSENGER | | | ELEVATOR THAT IS OPERATIONAL AND WILL ACCOMMODATE AN | | | AMBULANCE STRETCHER 76 INCHES LONG AND 24 INCHES WIDE | | | IN THE HORIZONTAL POSITION. | | | | | | 10. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL | | | BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL | | | DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS, | | | EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A | | | PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE | | | SAFETY FEATURES AND EQUIPMENT. | | | | | | PLEASE REVIEW THE MAXIMUM TRAVEL DISTANCE TO AN EXIT | | | PER NFPA 30, AS THE CORRIDORS LENGTHS ARE CLOSE TO | | | EXCEEEDING REQUIRED 200FT. | | | | | | 11. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED | | | ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF | | | FIRE PREVENTION. | | | | | | ALL NEW FIRE HYDRANTS AND FDC?S PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLOSELY COORDINATED WITH THE | | | BUREAU OF FIRE PREVENTION. PROPOSED FIRE HYDRANTS AND | | | FDC?S SHOULD BE LOCATED ON THE SAME SIDE OF THE STREET | | | OR ACCESS ROADWAY TO ALLOW FREE ACCESS FOR OTHER | | | ARRIVING EMERGENCY VEHICLES. | | | | | | IT IS NOTED THAT THERE ARE NO FIRE LANES PROPOSED FOR | | | THIS PROJECT. THE FIRE LANES WOULD BE REQUIRED TO BE | | | LOCATED AT BUILDING ACCESS POINTS, FIRE ALAMR PANELS, | | | FDC'S & HYDRANT LOCATIONS, WHICH CAN BE COMBINED IN | | | CLOSE PROXIMTY OF EACH OTHER FOR OPTIMUM FIRE GROUND | | | OPERATIONS. | | | | | | 12. KNOX-BOX KEY SYSTEM SHALL BE REQUIRED FOR THIS | | | BUILDING. | | | | | | ANY GATES SHALL BE PROVIDED WITH KNOX KEY ACCESS LOCKS, | | | PADLOCKS AND/OR SWITCHES FOR 24 HOUR EMERGENCY ACCESS. | | | | | | 13. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT | | | DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | 14. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING | | | PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH | | | THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
3 |
Status |
P |
Date |
02-08-2019 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
02-08-2019 |
Time |
16:38 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
02-08-2019 |
Time |
16:38 |
Sent To |
|
|
| Notes |
| 2019-02-08 16:39:52 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 | | | PROJECT: CLARE CPD Z18110022 | | | FEBRUARY 8, 2019 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. CONDITIONALLY SATISFIED. THE LANDSCAPE PLAN | | | SUBMITTED IS A DOWNGRADE FROM THE APPROVED PLAN. THERE | | | ARE MANY AREAS THAT COULD SUPPORT TREE CANOPY TO | | | PROVIDE SHADE FOR SIDEWALKS AND PLAZAS AND IMPROVE | | | PUBLIC AND PRIVATE OPEN SPACE AREAS. MORE SHRUB AREAS | | | CAN BE ADDED. STAFF WILL NOT SUPPORT WAIVERS THAT ARE | | | SELF CREATED. | | | STAFF IS STILL UNCLEAR AS TO WHAT SUPERIOR DESIGN | | | ELEMENTS ARE BEING PROVIDED AS JUSTIFICATION FOR THE | | | WAIVERS TO REDUCE REQUIRED TREE QUANTITIES FROM WHAT | | | WAS APPROVED ON THE ORIGINAL PD. PLEASE SUBMIT A CLEAR | | | JUSTIFICATION AS TO HOW THE PROPOSED LANDSCAPE PLAN | | | ACCOMPLISHES THIS. OTHER PROJECTS HAVE PROVIDED PAYMENT | | | IN LIEU FOR THE TREE CANOPY DEFICIENCY TO PROVIDE THE | | | TREE CANOPY ON PUBLIC PROPERTY AS A PUBLIC BENEFIT. | | | | | | 2. SATISFIED. ALL AREAS MUST BE LANDSCAPED TO MEET CODE | | | REQUIREMENTS, THE AREA REFERRED TO AS THE ART PARK | | | WOULD BE A SEPARATE AMENDMENT TO THE APPROVED PLAN IF | | | CHANGES ARE PROPOSED LATER. | | | | | | 3. SATISFIED. SHOW ALL AREAS OF ROADWAY BEAUTIFICATION | | | LANDSCAPE ON THE LANDSCAPE PLAN SO THAT THE FULL EFFECT | | | OF SEAMLESS DESIGN CAN BE CLEAR. | | | | | | 4. SATISFIED. PLEASE PROVIDE THE PERCENTAGE OF PALMS | | | SUBSTITUTED FOR REQUIRED TREES. THE CALCULATIONS FOR | | | THE PALMS PROVIDED ONLY ADD UP TO CREDIT FOR 49 TREES. | | | EXPLAIN HOW THE CREDIT CLAIMED FOR 77 TREES WAS | | | CALCULATED. | | | | | | 5. SATISFIED. CORRECT THE FLORIDA FRIENDLY LANDSCAPE | | | DESIGN CHART TO THE CURRENT CODE AND PROVIDE THE | | | REQUIRED 50 POINTS. | | | | | | 6. SATISFIED. PROVIDE INFORMATION ON GROUNDCOVER OR | | | GRASS AREAS TO JUSTIFY POINTS TAKEN ON THE FLORIDA | | | FRIENDLY LANDSCAPE DESIGN OPTIONS CHART, AS THE SOD | | | AREAS ARE NOT QUANTIFIED. | | | | | | 7. SATISFIED. CLUSIA AS A TREE FORM AS SPECIFIED HAS | | | NOT BEEN A SUCCESSFUL CONCEPT. FIND AN ALTERNATIVE TO | | | MEET THE TREE REQUIREMENT. | | | | | | 8. SATISFIED. PROVIDE SCREENING FOR BACKFLOW VALVES AND | | | SHOW LOCATIONS AND PROVIDE SCREENING FOR ANY A/C UNITS | | | OR GROUND MOUNTED EQUIPMENT. | | | | | | 9. SATISFIED. PROVIDE LOCATIONS OF LIGHTING ON THE | | | LANDSCAPE PLAN TO AVOID CONFLICTS WITH LANDSCAPING. | | | LIGHTING ALONG THE STREETS ARE PLACED IN EVERY AREA | | | WHERE LANDSCAPING COULD BE PLACED. LIGHTS NEED TO BE | | | LOCATED AWAY FROM LANDSCAPED AREAS WHERE THEY WOULD | | | CREATE CONFLICTS WITH ADDING TREES OR PALMS TO ENHANCE | | | THE LANDSCAPE. | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH | | | THIS PETITION. | | | | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION AS PERMITTED AND | | | INSTALLED. THIS WILL BE THROUGH A SEPARATE MAINTENANCE | | | AGREEMENT WITH THE CITY. | | | | | | 4. PRIOR TO SCHEDULING FOR CITY COMMISSION, THE | | | APPLICANT SHALL REVISE THE LANDSCAPE PLAN TO INCREASE | | | THE TREE CANOPY AREA WITHIN THE LARGE DOG PARK BY | | | ADDING TREES AT THE WEST SIDE, AND INCREASE THE TREE | | | CANOPY COVERAGE AT THE NORTHEAST PLAZA EITHER THROUGH | | | ADDITION OF TREES OR CHANGING SPECIES TO LARGER CANOPY | | | TREES. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
F |
Date |
01-18-2019 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
01-18-2019 |
Time |
16:14 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
01-18-2019 |
Time |
16:14 |
Sent To |
|
|
| Notes |
| 2019-01-18 16:15:14 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 | | | PROJECT: CLARE CPD Z18110022 | | | JANUARY 18, 2019 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. PARTIALLY SATISFIED. THE LANDSCAPE PLAN SUBMITTED IS | | | A DOWNGRADE FROM THE APPROVED PLAN. THERE ARE MANY | | | AREAS THAT COULD SUPPORT TREE CANOPY TO PROVIDE SHADE | | | FOR SIDEWALKS AND PLAZAS AND IMPROVE PUBLIC AND PRIVATE | | | OPEN SPACE AREAS. MORE SHRUB AREAS CAN BE ADDED. STAFF | | | WILL NOT SUPPORT WAIVERS THAT ARE SELF CREATED. | | | STAFF IS STILL UNCLEAR AS TO WHAT SUPERIOR DESIGN | | | ELEMENTS ARE BEING PROVIDED AS JUSTIFICATION FOR THE | | | WAIVERS TO REDUCE REQUIRED TREE QUANTITIES FROM WHAT | | | WAS APPROVED ON THE ORIGINAL PD. PLEASE SUBMIT A CLEAR | | | JUSTIFICATION AS TO HOW THE PROPOSED LANDSCAPE PLAN | | | ACCOMPLISHES THIS. OTHER PROJECTS HAVE PROVIDED PAYMENT | | | IN LIEU FOR THE TREE CANOPY DEFICIENCY TO PROVIDE THE | | | TREE CANOPY ON PUBLIC PROPERTY AS A PUBLIC BENEFIT. | | | | | | 2. SATISFIED. ALL AREAS MUST BE LANDSCAPED TO MEET CODE | | | REQUIREMENTS, THE AREA REFERRED TO AS THE ART PARK | | | WOULD BE A SEPARATE AMENDMENT TO THE APPROVED PLAN IF | | | CHANGES ARE PROPOSED LATER. | | | | | | 3. SATISFIED. SHOW ALL AREAS OF ROADWAY BEAUTIFICATION | | | LANDSCAPE ON THE LANDSCAPE PLAN SO THAT THE FULL EFFECT | | | OF SEAMLESS DESIGN CAN BE CLEAR. | | | | | | 4. SATISFIED. PLEASE PROVIDE THE PERCENTAGE OF PALMS | | | SUBSTITUTED FOR REQUIRED TREES. THE CALCULATIONS FOR | | | THE PALMS PROVIDED ONLY ADD UP TO CREDIT FOR 49 TREES. | | | EXPLAIN HOW THE CREDIT CLAIMED FOR 77 TREES WAS | | | CALCULATED. | | | | | | 5. SATISFIED. CORRECT THE FLORIDA FRIENDLY LANDSCAPE | | | DESIGN CHART TO THE CURRENT CODE AND PROVIDE THE | | | REQUIRED 50 POINTS. | | | | | | 6. SATISFIED. PROVIDE INFORMATION ON GROUNDCOVER OR | | | GRASS AREAS TO JUSTIFY POINTS TAKEN ON THE FLORIDA | | | FRIENDLY LANDSCAPE DESIGN OPTIONS CHART, AS THE SOD | | | AREAS ARE NOT QUANTIFIED. | | | | | | 7. SATISFIED. CLUSIA AS A TREE FORM AS SPECIFIED HAS | | | NOT BEEN A SUCCESSFUL CONCEPT. FIND AN ALTERNATIVE TO | | | MEET THE TREE REQUIREMENT. | | | | | | 8. SATISFIED. PROVIDE SCREENING FOR BACKFLOW VALVES AND | | | SHOW LOCATIONS AND PROVIDE SCREENING FOR ANY A/C UNITS | | | OR GROUND MOUNTED EQUIPMENT. | | | | | | 9. SATISFIED. PROVIDE LOCATIONS OF LIGHTING ON THE | | | LANDSCAPE PLAN TO AVOID CONFLICTS WITH LANDSCAPING. | | | LIGHTING ALONG THE STREETS ARE PLACED IN EVERY AREA | | | WHERE LANDSCAPING COULD BE PLACED. LIGHTS NEED TO BE | | | LOCATED AWAY FROM LANDSCAPED AREAS WHERE THEY WOULD | | | CREATE CONFLICTS WITH ADDING TREES OR PALMS TO ENHANCE | | | THE LANDSCAPE. | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH | | | THIS PETITION. | | | | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION AS PERMITTED AND | | | INSTALLED. THIS WILL BE THROUGH A SEPARATE MAINTENANCE | | | AGREEMENT WITH THE CITY. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
12-10-2018 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
12-10-2018 |
Time |
16:31 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
12-10-2018 |
Time |
16:31 |
Sent To |
|
|
| Notes |
| 2018-12-10 16:31:54 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 | | | PROJECT: CLARE CPD MAJOR Z18110022 | | | DECEMBER 7, 2018 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. THE LANDSCAPE PLAN SUBMITTED IS A DOWNGRADE FROM THE | | | APPROVED PLAN. THERE ARE MANY AREAS THAT COULD SUPPORT | | | TREE CANOPY TO PROVIDE SHADE FOR SIDEWALKS AND PLAZAS | | | AND IMPROVE PUBLIC AND PRIVATE OPEN SPACE AREAS. MORE | | | SHRUB AREAS CAN BE ADDED. STAFF WILL NOT SUPPORT | | | WAIVERS THAT ARE SELF CREATED. | | | | | | 2. ALL AREAS MUST BE LANDSCAPED TO MEET CODE | | | REQUIREMENTS, THE AREA REFERRED TO AS THE ART PARK | | | WOULD BE A SEPARATE AMENDMENT TO THE APPROVED PLAN IF | | | CHANGES ARE PROPOSED LATER. | | | | | | 3. SHOW ALL AREAS OF ROADWAY BEAUTIFICATION LANDSCAPE | | | ON THE LANDSCAPE PLAN SO THAT THE FULL EFFECT OF | | | SEAMLESS DESIGN CAN BE CLEAR. | | | | | | 4. PLEASE PROVIDE THE PERCENTAGE OF PALMS SUBSTITUTED | | | FOR REQUIRED TREES. THE CALCULATIONS FOR THE PALMS | | | PROVIDED ONLY ADD UP TO CREDIT FOR 49 TREES. EXPLAIN | | | HOW THE CREDIT CLAIMED FOR 77 TREES WAS CALCULATED. | | | | | | 5. CORRECT THE FLORIDA FRIENDLY LANDSCAPE DESIGN CHART | | | TO THE CURRENT CODE AND PROVIDE THE REQUIRED 50 POINTS. | | | | | | 6. PROVIDE INFORMATION ON GROUNDCOVER OR GRASS AREAS TO | | | JUSTIFY POINTS TAKEN ON THE FLORIDA FRIENDLY LANDSCAPE | | | DESIGN OPTIONS CHART, AS THE SOD AREAS ARE NOT | | | QUANTIFIED. | | | | | | 7. CLUSIA AS A TREE FORM AS SPECIFIED HAS NOT BEEN A | | | SUCCESSFUL CONCEPT. FIND AN ALTERNATIVE TO MEET THE | | | TREE REQUIREMENT. | | | | | | 8. PROVIDE SCREENING FOR BACKFLOW VALVES AND SHOW | | | LOCATIONS AND PROVIDE SCREENING FOR ANY A/C UNITS OR | | | GROUND MOUNTED EQUIPMENT. | | | | | | 9. PROVIDE LOCATIONS OF LIGHTING ON THE LANDSCAPE PLAN | | | TO AVOID CONFLICTS WITH LANDSCAPING. | | | LIGHTING ALONG THE STREETS ARE PLACED IN EVERY AREA | | | WHERE LANDSCAPING COULD BE PLACED. LIGHTS NEED TO BE | | | LOCATED AWAY FROM LANDSCAPED AREAS WHERE THEY WOULD | | | CREATE CONFLICTS WITH ADDING TREES OR PALMS TO ENHANCE | | | THE LANDSCAPE. | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH | | | THIS PETITION. | | | | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION AS PERMITTED AND | | | INSTALLED. THIS WILL BE THROUGH A SEPARATE MAINTENANCE | | | AGREEMENT WITH THE CITY. | | | |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
P |
Date |
12-13-2018 |
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2018-12-13 12:56:31 | TWO TRASH ROOMS HAVE BEEN NOTED. ENSURE THAT YOUR | | | SERVICE MEETS THE CAPACITY OF YOUR RESIDENTS AND ALL | | | SERVICE DUMPSTERS MUST BE AT ROAD SIDE FOR PICK UP BY | | | YOUR STAFF AT DESIGNATED DATE AND TIME. |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
P |
Date |
01-22-2019 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
01-22-2019 |
Time |
08:22 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
01-22-2019 |
Time |
08:23 |
Sent To |
|
|
| Notes |
| 2019-01-22 08:21:18 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 1/7/19 SUBMITTAL PACKAGE AND CAN BE A CONDITION FOR | | | SITE PLAN APPROVAL: | | | | | | 1. PUBLIC UTILITIES DEPARTMENT TO APPROVE ALL NON-SOD | | | PLANTINGS WITHIN 10 FEET OF A CWPB WATER/SEWER/STORM | | | FACILITY. | | | | | | 2. APPROPRIATE ROOT BARRIERS TO BE PROVIDED BETWEEN | | | TREES AND CWPB WATER/SEWER/STORM MAINS AND LATERALS. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
12-11-2018 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
12-11-2018 |
Time |
08:15 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
12-11-2018 |
Time |
08:17 |
Sent To |
|
|
| Notes |
| 2018-12-11 08:17:48 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT | | | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT | | | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR | | | MS,-PERMITS-APPLICATIONS | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. SHOW THE MILL AND RESURFACING LIMITS OF PUBLIC | | | ROADS. SEE CWPB?S STANDARD DETAIL GC-9 TO DETERMINE THE | | | LIMITS. | | | | | | 2. SHOW THE STORM PIPE ON BLANCHE STREET TO BE UPSIZED | | | TO 36? BEGINNING FROM THE CATCH BASIN ON THE WEST SIDE | | | OF ELIZABETH AVE. | | | | | | 3. ADD ROOT BARRIERS BETWEEN TREES AND THE EXFILTRATION | | | TRENCHES AND OTHER UTILITY PIPES WITHIN 10 FEET OF THE | | | TREES. | | | | | | 4. PROVIDE EXISTING INVERT ELEVATIONS OF THE SANITARY | | | SEWER SYSTEM. | | | | | | 5. PROVIDE SUFFICIENT HORIZONTAL CLEARANCE (MINIMUM 5 | | | FEET) BETWEEN THE OUTSIDES OF THE PROPOSED STORM AND | | | EXISTING SANITARY SEWER ON CLARE AVE. | | | | | | 6. SITE APPEARS TO BE WITHIN A SPECIAL FLOOD HAZARD | | | AREA. MINIMUM 2 FEET OF FREE BOARD IS REQUIRED FOR | | | STRUCTURES AND EQUIPMENT WITHIN A SFHA. | | | | | | 7. PUBLIC UTILITIES DEPARTMENT TO APPROVE ANY NON-SOD | | | PLANTINGS WITHIN 10 FEET OF A PUBLIC UTILITY LINE. | | | | | | 8. THERE APPEARS TO BE INSUFFICIENT COVER (~13 INCHES) | | | OVER THE STORM PIPE FROM STRUCTURE S-304. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY | | | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. | | | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS | | | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE | | | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS | | | | | | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED | | | WITH THE ENGINEERING PERMIT APPLICATION. | | | | | | 3. PROVIDE A COPY OF THE SFWMD ERP APPROVAL PRIOR TO | | | STARTING CONSTRUCTION. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
P |
Date |
01-24-2019 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
01-24-2019 |
Time |
07:58 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2019-01-24 07:58:42 | PASSED WITH CONDITION OF REPLAT PRIOR TO C.O. AND FINAL | | | APPROVAL OF ENGINEERING PLANS. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
12-11-2018 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
12-11-2018 |
Time |
14:09 |
Rev Time |
|
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2018-12-11 14:08:57 | 1. REPLAT OF PROPERTY WILL BE REQUIRED. | | | 2. ORIGINAL BUILDING PLANS DO NOT SHOW ENCROACHMENT | | | INTO THE CSX RIGHT-OF-WAY. HAVE SURVEYOR CONTACT | | | WALLACE SURVEYING TO DISCUSS. | | | 3. MAINTENANCE AGREEMENT WILL BE REQUIRED FOR ANY | | | IMPROVEMENTS IN R/W. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
3 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
02-06-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2019-02-06 17:10:21 | PASSED. | | | | | | CONDITIONS OF APPROVAL: | | | 1. PRIOR TO THE ISSUANCE OF THE FIRST BUILDING PERMIT, | | | CONTRIBUTE FUNDING OF $100,000 TO THE CITY TOWARDS THE | | | CONSTRUCTION OF THE CONTINUOUS PEDESTRIAN CONNECTION | | | ALONG CAROLINE STREET TO PARKER AVENUE, INCLUDING A | | | CROSSWALK ALONG PARKER AVENUE. | | | 2. IMPLEMENT, AT A MINIMUM, THE FOLLOWING TDM MEASURES: | | | A. PROVIDE TRANSIT INFORMATION TO ALL RESIDENTS AT A | | | PROMINENT LOCATION OF THE BUILDING | | | B. PROVIDE TRANSIT AND SFCS INFORMATION PACKET TO NEW | | | RESIDENTS | | | C. UNBUNDLING PARKING SPACE FROM THE LEASE FOR | | | TWO-BEDROOM UNITS | | | 3. PROVIDE CITY?S COMPREHENSIVE PLANNER YEARLY ON THE | | | STATISTICS OF TDM MEASURES. INFORMATION REQUIRED TO BE | | | DETERMINED BY THE CITY PLANNER. | | | 4. IMPLEMENT THE TWO ON-STREET LOADING ZONES ALONG | | | CLARE AVENUE AS FLEX ZONE, WHICH WILL BE DESIGNATED FOR | | | LOADING/UNLOAD DURING DAYTIME AND FOR TRANSPORTATION | | | NETWORK COMPANY (TNC) PICK-UP/DROP-OFF DURING EVENINGS | | | FROM 5PM TO MIDNIGHT. | | | 5. ALL ON-STREET PARKING SPACES ALONG THE PERIMETER OF | | | THE SITE WILL BE METERED BY THE CITY FOR CURBSIDE | | | MANAGEMENT. | | | | | | SHING TSOI | | | CITY IN-HOUSE TRAFFIC CONSULTANT | | | 561-494-1141 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
2 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
01-16-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2019-01-16 09:08:06 | PASSED WITH THE FOLLOWING CONDITIONS OF APPROVAL: | | | | | | 1. PRIOR TO THE ISSUANCE OF THE FIRST BUILDING PERMIT, | | | CONTRIBUTE FUNDING OF $100,000 TO THE CITY TOWARDS THE | | | CONSTRUCTION OF THE CONTINUOUS PEDESTRIAN CONNECTION | | | ALONG CAROLINE STREET TO PARKER AVENUE, INCLUDING A | | | CROSSWALK ALONG PARKER AVENUE. | | | 2. IMPLEMENT, AT A MINIMUM, THE FOLLOWING TDM MEASURES: | | | A. PROVIDE TRANSIT INFORMATION TO ALL RESIDENTS AT A | | | PROMINENT LOCATION OF THE BUILDING | | | B. PROVIDE TRANSIT AND SFCS INFORMATION PACKET TO NEW | | | RESIDENTS | | | C. UNBUNDLING PARKING SPACE FROM THE LEASE FOR | | | TWO-BEDROOM UNITS | | | D. PROVIDE FINANCIAL INCENTIVE TO UNITS WHO OPT OUT OF | | | PARKING SPACES. THE INCENTIVE COULD INCLUDE RENTAL | | | CREDIT, TRANSIT PASS SUBSIDY, RIDESHARE SERVICE | | | DISCOUNTS, ETC. | | | 3. SUBMIT A TRAVEL DEMAND MANAGEMENT (TDM) MONITORING | | | REPORT EVERY 12 MONTHS FOR 60 MONTHS AFTER THE ISSUANCE | | | OF THE FIRST CERTIFICATE OF OCCUPANCY, PREPARED AND | | | SIGNED BY A LICENSED ENGINEER OR CERTIFIED PLANNER, TO | | | DOCUMENT VARIOUS TDM MEASURES IMPLEMENTED, INCLUDING | | | THE DETAILS AND UTILIZATION OF EACH TDM MEASURE. | | | 4. IMPLEMENT THE TWO ON-STREET LOADING ZONES ALONG | | | CLARE AVENUE AS FLEX ZONE, WHICH WILL BE DESIGNATED FOR | | | LOADING/UNLOAD DURING DAYTIME AND FOR TRANSPORTATION | | | NETWORK COMPANY (TNC) PICK-UP/DROP-OFF DURING EVENINGS | | | FROM 5PM TO MIDNIGHT. | | | 5. ALL ON-STREET PARKING SPACES ALONG THE PERIMETER OF | | | THE SITE WILL BE METERED FOR CURBSIDE MANAGEMENT. | | | 6. PROVIDE PARKING FACILITIES FOR MICRO-MOBILITY | | | INCLUDING SCOOTERS IN ADDITION TO THE BIKE RACKS | | | OUTSIDE THE RETAIL/RESTAURANT. | | | | | | SHING TSOI | | | CITY IN-HOUSE TRAFFIC CONSULTANT | | | 561-494-1141 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
12-06-2018 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2018-12-06 16:23:51 | Z18110022_CLARE MIXED USE CPD AMENDMENT (DATED NOVEMBER | | | 13, 2018) COMMENTS: | | | | | | SITE PLAN | | | 1. CONSIDER PROVIDING WIDER SIDEWALK WITH AT LEAST 8 | | | FEET WIDE ALONG WILKINS AVENUE. | | | 2. THE JUSTIFICATION STATEMENT INCLUDES A WAIVER | | | REQUEST TO ALLOW FOR TWO ACCESS POINTS ON CLARE AVENUE, | | | BUT THE SITE PLAN DOES NOT INCLUDE THIS WAIVER AND ONLY | | | ONE ACCESS POINT ON CLARE AVENUE IS SHOWN. PLEASE | | | CLARIFY AND REVISE. | | | 3. THE LOADING SPACE SHOULD BE A MINIMUM OF 10 FEET X | | | 25 FEET PER CITY CODE 94-485(P). | | | 4. SHIFT THE CROSSWALK AT WILKINS AVENUE/WORTHINGTON | | | STREET SLIGHTLY TO THE NORTHEAST TO MINIMIZE THE | | | PEDESTRIAN CROSSING DISTANCE. | | | 5. THE CROSSWALK ACROSS CLARE AVENUE AT BLANCHE STREET | | | MAY BE REQUIRED TO BE SHIFTED TO THE WEST TO MINIMIZE | | | THE PEDESTRIAN CROSSING DISTANCE WHEN POD B IS | | | DEVELOPED. | | | 6. PROVIDE ADDITIONAL BACKUP AREA AT THE END OF THE | | | DEAD-END PARKING AISLE ON THE GROUND FLOOR FOR BACKUP | | | MANEUVER. | | | 7. INCREASE THE BUFFER AREA FOR PARKING SPACES AT BOTH | | | ENDS OF THE PARKING AISLE TO ACCOMMODATE VEHICLE | | | TURNING. | | | 8. PROVIDE DOCUMENTATION FOR USE OF PARKING RAMP SLOPE | | | OF 6.6%. OUR DOWNTOWN CODE RESTRICTS THE SLOPE TO A | | | MAXIMUM OF 6%. WE ARE CONCERNED ABOUT POTENTIAL | | | OPERATIONAL ISSUES SUCH WITH A SLOPE STEEPER THAN 6%. | | | TRAFFIC STUDY | | | 9. PROVIDE COUNTY TPS LETTER. | | | 10. THE INTERSECTION ANALYSES ARE SHOWING LOWER DELAYS | | | FOR SOME MOVEMENTS THAN THE ANALYSES IN THE PREVIOUS | | | APPROVAL WHILE INTERSECTION VOLUMES ARE SLIGHTLY | | | HIGHER. PLEASE VERIFY THE ANALYSES PARAMETERS ARE THE | | | SAME AS PREVIOUS ANALYSES INCLUDING CRITICAL AND | | | FOLLOW-UP HEADWAY SETTINGS AND REVISE AS NEEDED. | | | PARKING STUDY | | | 11. PLEASE ALSO INCLUDE UNBUNDLING SECOND PARKING SPACE | | | FROM THE TWO-BEDROOM DWELLING UNITS LEASE AS ONE OF THE | | | TDM MEASURES. | | | | | | ERIK D. FERGUSON. P.E. | | | CITY TRANSPORTATION ENGINEER | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
01-18-2019 |
|
|
Cont ID |
|
| Sent By |
hmtribou |
Date |
01-18-2019 |
Time |
15:46 |
Rev Time |
0.00 |
| Received By |
hmtribou |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2019-01-18 15:48:38 | CASE NUMBER: PB 1773C- MAJOR AMENDMENT | | | PROJECT NAME: 1701 CLARE AVE | | | | | | ZONING CONTACT: HEATHER M. TRIBOU | | | (561) 822-1562 | | | [email protected] | | | | | | PROCESS COMMENTS | | | | | | - PLEASE PROVIDE RESPONSES TO ALL REVIEW COMMENTS IN | | | WRITTEN FORMAT. | | | | | | - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF ELEVEN | | | (11) FULL SIZE PRINT COPIES AND ALL FILES ELECTRONIC IN | | | PDF FORMAT. PLEASE NOTE THAT CHANGES ON THE RESUBMITTED | | | PLANS OR THE SUBMITTAL OF INFORMATION/PLANS TO ADDRESS | | | THE COMMENTS MAY RESULT IN ADDITIONAL COMMENTS. | | | | | | - THE PPRC COMMENTS SHALL BE SUFFICIENTLY ADDRESSED AND | | | SUBMITTED TO THE PLANNING DIVISION BY 5 PM ON FRIDAY, | | | FEBRUARY 1, 2019, TO BE SCHEDULED FOR THE FEBRUARY 19, | | | 2019 PLANNING BOARD MEETING. | | | | | | - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT | | | RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS | | | FROM THE DATE OF THESE COMMENTS/THE PPRC MEETING (BY | | | MARCH 20, 2019), THE CASE SHALL BE CONSIDERED | | | WITHDRAWN. ANY FURTHER ACTION SHALL REQUIRE A NEW | | | DEVELOPMENT APPLICATION. | | | | | | - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20% OF THE ORIGINAL APPLICATION FEE. ($812) | | | | | | - PUBLIC HEARING NOTIFICATION SIGNAGE SHALL BE POSTED | | | IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION | | | 94-39(I)(5) OF THE ZONING AND LAND DEVELOPMENT | | | REGULATIONS. | | | | | | GENERAL COMMENTS | | | | | | --THE WORKFORCE HOUSING PROGRAM FOR THE PROJECT WAS | | | ORIGINALLY APPROVED WITH 20% OF THE TOTAL UNITS | | | DEDICATED AS WORKFORCE AT 140% OF AMI FOR 15 YEARS. IT | | | IS UNDERSTOOD THAT THE APPLICANT IS WORKING WITH | | | HOUSING AND COMMUNITY DEVELOPMENT TO PROVIDE DEDICATED | | | WORKFORCE HOUSING AT 120% AMI. | | | | | | --PROVIDE UPDATED VERSION OF THE SCHOOL DISTRICT OF | | | PALM BEACH COUNTY SCHOOL CAPACITY AVAILABILITY | | | DETERMINATION FOR ADDITIONAL RESIDENTIAL UNITS BEFORE | | | THE SCHEDULING OF PLANNING BOARD. | | | | | | -- COMMITMENT TO PROVIDE A CONTRIBUTION FOR BICYCLE AND | | | PEDESTRIAN CONNECTION ON CAROLINE TO PARKER AVE. AS | | | DISCUSSED FOR WAIVER 2 SHALL BE PROVIDED BEFORE | | | BUILDING PERMIT ISSUANCE. | | | | | | --AT WHICH TIME, ANY PART OF PHASE TWO OF THE | | | MASTERPLAN IS DEVELOPED, IT SHALL REQUIRE A REPLAT | | | (MAJOR SUBDIVISION) AND MUST PROVIDE A 10? WIDE BICYCLE | | | AND PEDESTRIAN ACCESS EASEMENT CONNECTING PERPENDICULAR | | | TO CLARE AVENUE RIGHT-OF-WAY STRAIGHT TO SEABOARD COAST | | | LINE RAILROAD CO. RIGHT-OF-WAY. | | | | | | --MASTER PLAN-ADD NOTE ONLY, LOCATION TO BE DETERMINED, | | | FOR FUTURE 10? WIDE BICYCLE AND PEDESTRIAN ACCESS | | | EASEMENT CONNECTING PERPENDICULAR TO CLARE AVENUE | | | RIGHT-OF-WAY STRAIGHT TO SEABOARD COAST LINE RAILROAD | | | CO. RIGHT-OF-WAY. | | | | | | --PROVIDE FURTHER JUSTIFICATION FOR SUPPORT OF | | | LANDSCAPE WAIVERS HOW IT RESULTS IN SUPERIOR DESIGN | | | 94-207. | | | | | | --IMPLEMENT, AT A MINIMUM, THE FOLLOWING TDM MEASURES: | | | A. PROVIDE TRANSIT INFORMATION TO ALL RESIDENTS AT A | | | PROMINENT LOCATION OF THE BUILDING | | | B. PROVIDE TRANSIT AND SFCS INFORMATION PACKET TO NEW | | | RESIDENTS | | | C. UNBUNDLING PARKING SPACE FROM THE LEASE FOR | | | TWO-BEDROOM UNITS AND PROVIDE THE CITY?S COMPREHENSIVE | | | PLANNER YEARLY (DECEMBER) NUMBERS OF UNBUNDLED SPACES. | | | | | | --IMPLEMENT THE TWO ON-STREET LOADING ZONES ALONG CLARE | | | AVENUE AS FLEX ZONE, WHICH WILL BE DESIGNATED FOR | | | LOADING/UNLOAD DURING DAYTIME AND FOR TRANSPORTATION | | | NETWORK COMPANY (TNC) PICK-UP/ DROP-OFF DURING EVENINGS | | | FROM 5PM TO MIDNIGHT. | | | | | | --PLEASE NOTE, ON-STREET PARKING SPACES ALONG THE | | | PERIMETER OF THE SITE MAY BE METERED BY THE CITY FOR | | | CURBSIDE MANAGEMENT IN THE FUTURE. | | | | | | --PROVIDE PARKING FACILITIES FOR MICRO-MOBILITY | | | INCLUDING SCOOTERS IN ADDITION TO THE BIKE RACKS | | | OUTSIDE THE RETAIL/RESTAURANT. | | | | | | SPECIFIC COMMENTS | | | | | | --MASTERPLAN-POD A SAYS 359,089 WHICH IS THE TOTAL GFA | | | FOR BOTH PODS, PLEASE CORRECT TO INCLUDE PHASE ONE | | | ONLY. | | | | | | --SITE PLAN- UPDATE NOTE 10 TO MATCH THE HARDSCAPE | | | DESIGN CONCEPT BOOKLET- SHEET 3ART/DOG PARK PLAN FOR | | | CONSISTENCY. | | | | | | --SITE PLAN- POD A SITE DATA, RESIDENTIAL BUILDING | | | SQUARE FEET DIFFERS FROM ARCHITECTURAL PLANS. | | | | | | --SITE PLAN- NOTE ON BOTTOM OF SHEET ABOUT POD B TALKS | | | ABOUT PHASE 1 AND IS CONFUSING, MAYBE SHOULD SAY | | | EXISTING. | | | | | | --SITE PLAN AND HARDSCAPE DESIGN- PROVIDE FURNISHINGS | | | AND OR BIKE RACK AT ENTRY OF RESIDENTIAL. | | | | | | --ARCHITECTURAL PLANS -VERIFY ALL HEIGHTS IN ALL | | | ELEVATIONS. BUILDING, HEIGHT OF, MEANS THE VERTICAL | | | DISTANCE FROM THE MEAN GRADE OF A LOT AT THE FRONTAGE | | | OF THE BUILDING TO THE HIGHEST POINT OF THE TOP OF THE | | | STRUCTURE OF A FLAT ROOF. PER SEC. 94-306 PARAPETS HAVE | | | EXCEPTIONS TO THE HEIGHT LIMITS. THIS MAY EFFECT WAIVER | | | 6. | | | | | | --ARCHITECTURAL PLANS- LABEL MATERIALS ON ELEVATIONS- | | | LEVEL OF VISUAL INTEREST STILL LACKING FROM INITIAL | | | APPROVALS, LOTS OF WHITE AND GREY STUCCO. | | | | | | --ARCHITECTURAL PLANS-BALCONIES MAY ENCROACH IN | | | SETBACKS BY 3 FEET, PLEASE LOOK INTO CREATING LARGER | | | BALCONY SPACES AND SHOW SAMPLE WITH FURNISHING. | | | JUSTIFICATION SAYS THAT 5 FEET IS AN INDUSTRY | | | STANDARDS, BUT UNIT B1 HAS A DEPTH MEASURED ON THE | | | RIGHT SIDE OF THE PLAN AS LESS THAN 5 FEET. | | | | | | --ARCHITECTURAL PLANS-PREVIOUS APPROVAL PROVIDED | | | PLANTING AREAS FOR EVERY UNIT. PLEASE PROVIDE DETAIL OR | | | EQUIVALENT. | | | | | | --ARCHITECTURAL PLANS-COMMERCIAL SPACE IS LABELED AS | | | RETAIL. SITE PLAN AND JUSTIFICATION FOR WAIVER 1 SAY IT | | | IS RESTAURANT WITH OUTDOOR SEATING. PLEASE COORDINATE | | | AND CORRECT. | | | | | | --ARCHITECTURAL PLANS-REMOVE LAWN TEXT FROM RAIN | | | GARDEN. | | | | | | --PHOTOMETRIC- COORDINATE LAMP POST WITH LANDSCAPE, | | | CONFLICTS EXIST. | | | | | | --CIVIL PLANS-MOVE FIRE HYDRANT AWAY FROM ART PARK AT | | | CORNER OF WILKINS AND CLARE. | | | | | | --CIVIL PLANS- UNCLEAR OF DRAINAGE IN ART PARK, LOOKS | | | LIKE A DRAIN IS LOCATED WHERE THE ART IS GOING. | | | | | | | | | | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
12-12-2018 |
|
|
Cont ID |
|
| Sent By |
hmtribou |
Date |
12-12-2018 |
Time |
10:22 |
Rev Time |
0.00 |
| Received By |
hmtribou |
Date |
01-18-2019 |
Time |
15:46 |
Sent To |
|
|
| Notes |
| 2019-01-11 08:33:09 | CASE NUMBER: PB 1773C- MAJOR AMENDMENT | | | PROJECT NAME: 1701 CLARE AVE | | | | | | ZONING CONTACT: HEATHER M. TRIBOU | | | (561) 822-1562 | | | [email protected] | | | | | | PROCESS COMMENTS | | | | | | - PLEASE PROVIDE RESPONSES TO ALL REVIEW COMMENTS IN | | | WRITTEN FORMAT. | | | | | | - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF ELEVEN | | | (11) FULL SIZE PRINT COPIES AND ALL FILES ELECTRONIC IN | | | PDF FORMAT. PLEASE NOTE THAT CHANGES ON THE RESUBMITTED | | | PLANS OR THE SUBMITTAL OF INFORMATION/PLANS TO ADDRESS | | | THE COMMENTS MAY RESULT IN ADDITIONAL COMMENTS. | | | | | | - THE PPRC COMMENTS SHALL BE SUFFICIENTLY ADDRESSED AND | | | SUBMITTED TO THE PLANNING DIVISION BY 5 PM ON FRIDAY, | | | DECEMBER 28, 2018, TO BE SCHEDULED FOR THE FEBRUARY 19, | | | 2019 PLANNING BOARD MEETING. | | | | | | - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT | | | RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS | | | FROM THE DATE OF THESE COMMENTS/THE PPRC MEETING (BY | | | FEBRUARY 11, 2019), THE CASE SHALL BE CONSIDERED | | | WITHDRAWN. ANY FURTHER ACTION SHALL REQUIRE A NEW | | | DEVELOPMENT APPLICATION. | | | | | | - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20% OF THE ORIGINAL APPLICATION FEE. | | | | | | - PUBLIC HEARING NOTIFICATION SIGNAGE SHALL BE POSTED | | | IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION | | | 94-39(I)(5) OF THE ZONING AND LAND DEVELOPMENT | | | REGULATIONS. | | | | | | COMMENTS | | | | | | --THE WORKFORCE HOUSING PROGRAM FOR THE PROJECT WAS | | | ORIGINALLY APPROVED WITH 20% OF THE TOTAL UNITS | | | DEDICATED AS WORKFORCE AT 140% OF AMI FOR 15 YEARS. IT | | | HAS BEEN REDUCED TO 10 YEARS. IF 10 YEARS, THE | | | COMMITMENT SHOULD BE 20 % OF THE UNITS AT 110% OF AMI. | | | | | | --PROVIDE UPDATED VERSION OF THE SCHOOL DISTRICT OF | | | PALM BEACH COUNTY? SCHOOL CAPACITY AVAILABILITY | | | DETERMINATION FOR ADDITIONAL RESIDENTIAL UNITS. | | | | | | --WAIVER 2 SHOULD DISCUSS THE PREVIOUSLY APPROVED | | | COMMITMENT TO PROVIDE A CONTRIBUTION FOR BICYCLE AND | | | PEDESTRIAN CONNECTION ON CAROLINE TO PARKER AVE. | | | | | | --STAFF DOES NOT SUPPORT WAIVER 3 AT THIS TIME. THE | | | PROPERTY MAY HAVE AN INDUSTRIAL/ WAREHOUSE THEME, BUT | | | IS BEING USED AS RESIDENTIAL. IN FACT, THE AREA IS IN | | | NEED OF TREES WITH THE CHANGE OF USE. | | | | | | --STAFF DOES NOT SUPPORT WAIVER NUMBER 4 AT THIS TIME, | | | NO SUPERIOR DESIGN ELEMENTS HAVE BEEN PROVIDED FOR THE | | | JUSTIFICATION. | | | | | | --AN ADDITIONAL WAIVER SHOULD BE REQUESTED FOR | | | ON-STREET LOADING FROM TABLE XV-4 FROM THE LOADING | | | SPACE SIZE WHICH IS REQUIRED TO BE 10? X 25? | | | | | | --IF LOADING IS AT STREET LEVEL CAN GARAGE OPENING | | | SHOULD BE LOWER. | | | | | | --DISCUSS THE REASONING FOR THE GATE LOCATION IN THE | | | PARKING GARAGE THE JUSTIFICATION STATEMENT. | | | | | | --PROVIDE EXAMPLES OR INFORMATION ON THE DOG SPA. | | | | | | --PROVIDE MASTER SIGN PLAN | | | | | | --PROVIDE LIGHTING PLAN WITH PHOTOMETRIC. | | | | | | MASTER PLAN-ADD NOTES FOR REQUIRED BUFFERS IN POD B AT | | | PARCEL LINES. | | | | | | MASTER PLAN-UPDATE PEDESTRIAN AND VEHICULAR CONNECTION | | | POINT TO COORDINATE WITH UPDATED PLANS | | | | | | SITE PLAN (PHASE 1)- PEDESTRIAN PLAZA AND HAS BEEN | | | REDUCED CONSIDERABLY, PLEASE PROVIDE A DETAILED, | | | SUPERIOR DESIGN FOR NEW PLAZA WITH CLEAR RELATIONSHIP | | | TO SURROUNDINGS WITH LOCATION OF POTENTIAL SEATING. | | | | | | SITE PLAN (PHASE 1)- THE PASSIVE PARK AREA HAS BEEN | | | REDUCED IN SIZE AND IS ONLY SHOWN AS A FENCED OFF AREA. | | | PLEASE PROVIDE DETAILED PLAN ADDRESSING THE IMPORTANT | | | CORNER AT WILKENS AND CLARE. | | | | | | SITE PLAN- UPDATE SETBACK REQUIREMENT BASED OF EACH | | | BUILDING AND ADJUST WAIVER. | | | | | | SITE PLAN- PROVIDE LOW IMPACT DEVELOPMENT WERE | | | APPLICABLE. | | | | | | SITE PLAN- SOME SIDEWALK LOCATIONS MAY NEED TO BE | | | ADJUSTED, EXAMPLE, SIDEWALK TO BIKE PARKING IN GARAGE. | | | | | | SITE PLAN- BASED OFF PUBLIC OUTREACH, LANDSCAPE ISLANDS | | | IN THE RIGHT-OF-WAY MAY NEED TO BE REDUCED. | | | | | | FSP2- PROVIDE FURNISHING DETAILS | | | | | | FSP2- PROVIDE FENCE AND GATE DETAIL. | | | | | | ARCHITECTURAL PLANS -VERIFY ALL HEIGHTS IN ALL | | | ELEVATIONS. ?BUILDING, HEIGHT OF, MEANS THE VERTICAL | | | DISTANCE FROM THE MEAN GRADE OF A LOT AT THE FRONTAGE | | | OF THE BUILDING TO THE HIGHEST POINT OF THE TOP OF THE | | | STRUCTURE OF A FLAT ROOF.? | | | | | | ARCHITECTURAL PLANS- PROVIDE ACCESS TO PARKING GARAGE | | | FROM ALL FOUR CORNERS AT EACH LEVEL. | | | | | | ARCHITECTURAL PLANS- PROVIDE ACCESS TO PARKING GARAGE | | | PARKING ENTRANCE AT ELIZABETH AVE. | | | | | | ARCHITECTURAL PLANS- LABEL MATERIALS ON ELEVATIONS | | | | | | ARCHITECTURAL PLANS- PROVIDE PICTURES AND DESCRIPTION | | | OF MATERIALS BEING USED. | | | | | | ARCHITECTURAL PLANS- DIMENSION SIGNAGE | | | | | | ARCHITECTURAL PLANS -GARAGE ON CLARE AVE. SIDE SHOULD | | | HAVE VISUAL INTEREST FOR PEDESTRIANS AND NOT BE BLANK | | | SPACE. | | | | | | ARCHITECTURAL PLANS-BALCONIES MAY ENCROACH IN SETBACKS | | | BY 3 FEET, PLEASE LOO INTO CREATING LARGER BALCONY | | | SPACES AND SHOW SAMPLE WITH FURNISHING | | | | | | LANDSCAPE PLAN-ALL PUBLIC OPEN SPACE SHALL BE DESIGNED | | | FOR SITE PLAN APPROVAL. | | | | | | LANDSCAPE PLAN- ADDRESS PARKING GARAGE ON INTERIOR | | | VIEWS OF AMENITY SPACES | | | | | | LANDSCAPE PLANS-PREVIOUS APPROVAL PROVIDED PLANTING | | | AREAS FOR EVERY UNIT. PLEASE PROVIDE DETAIL OR | | | EQUIVALENT. | | | |
|
|
| |