|
 |
 |
 |
 |
 |
Plan Review Details - Project Z18080017
| Plan Review Stops For Project Z18080017 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
09-11-2018 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
09-11-2018 |
Time |
13:14 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
09-11-2018 |
Time |
13:14 |
Sent To |
|
|
| Notes |
| 2018-09-11 13:15:04 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | NO COMMENTS ON THE PROPOSED REPLAT. | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
09-06-2018 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
09-06-2018 |
Time |
10:46 |
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
09-06-2018 |
Time |
10:41 |
Sent To |
|
|
| Notes |
| 2018-09-06 10:46:27 | FIRE HAS NO OBJECTIONS TO THE PROPOSED REPLAT. |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
09-17-2018 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
09-17-2018 |
Time |
17:06 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
09-17-2018 |
Time |
17:06 |
Sent To |
|
|
| Notes |
| 2018-09-17 17:07:17 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 | | | PROJECT: 1701 CLARE PD PLAT Z18080017 | | | SEPTEMBER 17, 2018 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. THE PROPOSED SUBDIVISION LINES LOCATED IN THE CENTER | | | OF EXISTING PARKING AREAS CREATES A NONCONFORMITY TO | | | THE LANDSCAPE CODE FOR REQUIRED LANDSCAPE BUFFERS. | | | | | | 2. PROVIDE THE PERCENTAGE OF ACTUAL LANDSCAPE AREA AND | | | PERVIOUS AREA FOR THE EXISTING LOTS AND PROPOSED LOTS | | | IN ORDER TO DETERMINE IF ANY NONCONFORMITY IS CREATED | | | OR INCREASED. | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
09-11-2018 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
09-11-2018 |
Time |
14:49 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2018-09-11 14:49:58 | TECHNICAL PLAT REVIEW WILL BE REQUIRED BY ENGINEERING. | | | WE ARE REVIEWING THE BUILDING ENCROACHMENTS INTO THE | | | CSX R/R AND PARKING/DRIVEWAY AT CLARE/WILKINS. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
09-06-2018 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2018-09-06 14:52:45 | TRAFFIC HAS NO OBJECTIONS TO THE REPLAT. | | | | | | ERIK D. FERGUSON, PE | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
09-18-2018 |
|
|
Cont ID |
|
| Sent By |
hmtribou |
Date |
09-18-2018 |
Time |
11:41 |
Rev Time |
0.00 |
| Received By |
hmtribou |
Date |
09-18-2018 |
Time |
11:40 |
Sent To |
|
|
| Notes |
| 2018-09-18 11:43:17 | DEPTH OF LOT LINES ON SURVEY DIFFER FROM SURVEY ON | | | FILE. SURVEY ON FILE FOR SITE PLAN APPROVAL FOR | | | BUILDINGS LOCATED IN PHASE TWO HAVE LOT LINES DEEPER | | | THEN INDICATED ON SURVEY FOR PLAT. |
|
|
| |
Print |
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |