Plan Review Stops For Project Z18050032
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 06-12-2018 Cont ID  
Sent By rbrown Date 06-12-2018 Time 18:44 Rev Time 0.00
Received By rrossano Date 06-12-2018 Time 18:44 Sent To  
Notes
2018-06-13 10:25:23DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. AN APPLICATION MUST BE SUBMITTED
 FOR BUILDING PERMIT.
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 2 Status P Date 08-21-2018 Cont ID  
Sent By RRossano Date 08-22-2018 Time   Rev Time 1.00
Received By rrossano Date 08-21-2018 Time   Sent To Z
Notes
***NONE***

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status F Date 06-13-2018 Cont ID  
Sent By Mgonzale Date 06-13-2018 Time   Rev Time 1.00
Received By mgonzale Date 06-13-2018 Time   Sent To I
Notes
2018-06-13 13:03:13#1 SHOW THE EXTENTS OF THE 12" DIAMETER WATERMAIN.
  
 #2 SHOW LOCATION OF PRIVATE LIFT STATION/ FM/ AND
 GRAVITY SEWER LINES IF PRESENT NEAR PARKING.
  
 MANNY GONZALEZ
 SENIOR ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS
 /FORMS,-PERMITS-APPLICATIONS
  
 IMPORTANT MESSAGE: AS OF DECEMBER 20, 2015 THE CITY OF
 WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD
 FREE."
 FOR MORE INFORMATION REFER TO THE LINK BELOW:
 HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI
 CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 06-08-2018 Cont ID  
Sent By pleduc Date 06-08-2018 Time   Rev Time 0.00
Received By pleduc Date 06-08-2018 Time 14:51 Sent To  
Notes
2018-06-08 14:52:54THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC,
 FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM
 BEACH FIRE RESCUE.
  
 THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE
 DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE.
  
 1) THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE
 PROPOSED.
  
 2) THIS COMMENT IS FOR INFORMATIONAL PURPOSES.
  
 IT IS NOTED THAT THE LANDSCAPE PLAN INDICATES SEVERAL
 TREES ALONG THE FIRE APPARATUS TRAVEL PATH. THERE HAVE
 BEEN INSTANCES ON PREVIOUS PROJECTS THAT THE CANOPY OF
 THE TREES HAS GROWN OVER SEVERAL YEARS AND EXTENDED
 INTO FIRE APPARATUS TRAVEL PATH RESTRICTING FIRE
 APPARATUS ACCESS.
  
 THE WIDTH OF A FIRE LANE IS 20' AND THE HEIGHT IS
 13'6".
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop L LANDSCAPING
Rev No 2 Status P Date 08-23-2018 Cont ID  
Sent By rcaranci Date 08-23-2018 Time 15:02 Rev Time 0.00
Received By rcaranci Date 08-23-2018 Time 15:02 Sent To  
Notes
2018-08-23 15:03:09FROM: RAY CARANCI, LANDSCAPE PLANNER
 PROJECT: KEISER U PARKING Z18050032
 AUGUST 23, 2018
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
 1. SATISFIED. THE PHASE 1 PARKING LOT AND LANDSCAPING
 NEEDS TO BE INDICATED DIFFERENTLY ON THE LANDSCAPE
 PLANS. PLEASE INDICATE THE PLAN FOR PHASE 1 MATCHING
 WHAT WAS APPROVED WITH THE MAJOR AMENDMENT WILL BE
 INSTALLED. THEN THIS SUBMITTED PLAN WILL REPRESENT THE
 MODIFICATION FOR PHASE 2.
  
 2. SATISFIED. SHOW THAT THE REQUIRED PARKING LOT TREES
 MEET THE 75% SHADE TREE REQUIREMENT.
  
 3. SATISFIED. THE TREE DISPOSITION PLAN INDICATES TWO
 LARGE LIVE OAK TREES AND TWO SEAGRAPES TO BE REMOVED
 FOR THE CONSTRUCTION OF THE PHASE 2 PARKING AREA. CODE
 REQUIRES ALL NATIVE TREES IN GOOD CONDITION TO BE
 PRESERVED OR RELOCATED.
  
 4. SATISFIED. THERE ARE SOME QUESTIONS FROM THE
 CONTRACTOR REGARDING THE RELOCATION OF THE CHAIN LINK
 FENCE ON THE SOUTH BUFFER OF THE FOOTBALL AREA TO THE
 PROPERTY LINE. THE SABAL PALMS ARE PART OF THE APPROVED
 BUFFER AT THE NARROWEST POINT FOR WHICH A WAIVER WAS
 APPROVED, AND MUST BE RELOCATED TO STILL PROVIDE THE
 INTENDED BUFFERING. IF ANY PALMS DO NOT SURVIVE, THEY
 MUST BE REPLACED. AT THIS TIME THE PLAN SHOULD INCLUDE
 ADJUSTMENTS TO THIS AREA.
  
 THE UNIVERSITY HAS COMMITTED TO PROTECTING THE PALMS ON
 THE OUTSIDE OF THE FENCE, AND POSSIBLY PURCHASING THE
 ADJACENT PARCEL.
  
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop L LANDSCAPING
Rev No 1 Status F Date 06-11-2018 Cont ID  
Sent By rcaranci Date 06-11-2018 Time 17:17 Rev Time 0.00
Received By rcaranci Date 06-11-2018 Time 17:17 Sent To  
Notes
2018-06-11 17:19:08FROM: RAY CARANCI, LANDSCAPE PLANNER
 PROJECT: KEISER U PARKING Z18050032
 JUNE 11, 2018
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
 1. THE PHASE 1 PARKING LOT AND LANDSCAPING NEEDS TO BE
 INDICATED DIFFERENTLY ON THE LANDSCAPE PLANS. PLEASE
 INDICATE THE PLAN FOR PHASE 1 MATCHING WHAT WAS
 APPROVED WITH THE MAJOR AMENDMENT WILL BE INSTALLED.
 THEN THIS SUBMITTED PLAN WILL REPRESENT THE
 MODIFICATION FOR PHASE 2.
  
 2. SHOW THAT THE REQUIRED PARKING LOT TREES MEET THE
 75% SHADE TREE REQUIREMENT.
  
 3. THE TREE DISPOSITION PLAN INDICATES TWO LARGE LIVE
 OAK TREES AND TWO SEAGRAPES TO BE REMOVED FOR THE
 CONSTRUCTION OF THE PHASE 2 PARKING AREA. CODE REQUIRES
 ALL NATIVE TREES IN GOOD CONDITION TO BE PRESERVED OR
 RELOCATED.
  
 4. THERE ARE SOME QUESTIONS FROM THE CONTRACTOR
 REGARDING THE RELOCATION OF THE CHAIN LINK FENCE ON THE
 SOUTH BUFFER OF THE FOOTBALL AREA TO THE PROPERTY LINE.
 THE SABAL PALMS ARE PART OF THE APPROVED BUFFER AT THE
 NARROWEST POINT FOR WHICH A WAIVER WAS APPROVED, AND
 MUST BE RELOCATED TO STILL PROVIDE THE INTENDED
 BUFFERING. IF ANY PALMS DO NOT SURVIVE, THEY MUST BE
 REPLACED. AT THIS TIME THE PLAN SHOULD INCLUDE
 ADJUSTMENTS TO THIS AREA.
  
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  
  

Review Stop STORM STORMWATER
Rev No 2 Status P Date 08-24-2018 Cont ID  
Sent By tward Date 08-24-2018 Time 14:00 Rev Time 0.00
Received By tward Date 08-24-2018 Time 14:05 Sent To  
Notes
2018-08-24 14:05:38THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 AUGUST 22, 2018 SUBMITTAL PACKAGE:
 1. ADD THE NAVD TO NGVD CONVERSION EQUATION TO THE 21
 PAGE SURVEY PACKAGE.
  
 2. REVISE THE SCALE BAR ON SHEET EXH1. I BELIEVE THE
 SCALE SHOULD BE 1 INCH = 40 FEET.
  
 3. DESIGN THE LANDSCAPE STRIPS DEEP ENOUGH FOR WATER TO
 FLOW AROUND THE PROPOSED TREES AND NOT BACK UP ONTO THE
 PARKING LOT.
  
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120

Review Stop STORM STORMWATER
Rev No 1 Status F Date 06-13-2018 Cont ID  
Sent By tward Date 06-13-2018 Time 07:13 Rev Time 0.00
Received By tward Date 06-13-2018 Time 07:14 Sent To  
Notes
2018-06-13 07:14:23THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT HTTP://
 WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PER
 MITS-APPLICATIONS
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. ON PAVING, GRADING & DRAINAGE PLANS, REDUCE THE SIZE
 OF THE PROPERTY CORNER SYMBOLS SO AS TO NOT BE CONFUSED
 WITH THE CATCH BASIN SYMBOL.
  
 2. CONSIDER REDUCING THE LENGTH OF THE PARKING SPACES
 AND PROVIDE TWO FEET OF OVERHANG IN THE LANDSCAPE
 AREAS. THIS WILL REDUCE THE AMOUNT OF ASPHALT AND
 INCREASE THE PERVIOUS AREA.
  
 3. CONSIDER GRADING THE PARKING LOT TO DRAIN TO THE
 GREEN AREAS, ESPECIALLY IF THE LENGTH OF THE PARKING
 SPACES WILL BE REDUCED.
  
 4. CONSIDER INCORPORATING LOW IMPACT DESIGN (LID)
 LANDSCAPING IN THE GREEN AREAS BETWEEN THE PARKING
 ROWS, ESPECIALLY IF #2 AND #3 ABOVE ARE ADOPTED.
 CONSIDER LID WITHIN THE DRY DETENTION AREA.
  
 5. LABEL THE DRY RETENTION AREA AS DRY DETENTION AREA
 SINCE IT WILL HAVE AN OUTLET PIPE.
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE
 ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 2. PROVIDE SFWMD ERP MODIFICATION FOR THE DEVELOPMENT.
  
 3. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  

Review Stop SURVEY SURVEYING
Rev No 2 Status P Date 09-20-2018 Cont ID  
Sent By vnoel Date 09-20-2018 Time 09:11 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
2018-09-20 09:11:10PASSED BUT ADD CONVERSION FACTOR FROM NAVD 88 TO NGVD
 29 AND PROVIDE SIGNED AND SEALED COPIES.

Review Stop SURVEY SURVEYING
Rev No 1 Status F Date 06-11-2018 Cont ID  
Sent By vnoel Date 06-11-2018 Time 09:16 Rev Time  
Received By vnoel Date   Time   Sent To  
Notes
2018-06-11 09:18:051. NO SURVEY PROVIDED.
 2. ENGINEERING DEVELOPMENT APPLICATION WILL BE
 REQUIRED.

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
2018-06-12 16:27:43KEISER UNIVERSITY
  
 ERIK FERGUSON - 494-1092
  
 1. PROVIDE SIDEWALKS AND MORE SHADE TREES ALONG THE
 NORTH SIDE OF UNIVERSITY DR. TO CONNECT THE EDGES OF
 THE PARKING LOT.
 2. DESIGN FOR RAISED CROSSWALK AT CURRENT SPEED BUMPS.
 3. PROVIDE SIDEWALK IN TERMINAL ISLAND.

Review Stop Z ZONING
Rev No 2 Status P Date 08-30-2018 Cont ID  
Sent By eschneid Date 08-30-2018 Time 16:57 Rev Time 0.00
Received By eschneid Date 08-30-2018 Time 11:05 Sent To  
Notes
2018-08-30 17:00:05CASE NO. PB1069Y
 KEISER UNIVERSITY EXPANDED PARKING LOT
 2600 N. MILITARY TRAIL
  
 - CONTACT ERIC SCHNEIDER @ (561) 822-1446
  
 1) THE PLANS FOR THE NORTHERN PARKING LOT PASSED ALL
 REVIEWS AND AN APPROVAL LETTER WILL BE ISSUED FOR THIS
 PART OF THE CAMPUS. CONDITION OF APPROVAL: THE EXISTING
 SIDEWALK ON THE SOUTH SIDE OF UNIVERSITY DRIVE NEEDS TO
 EXTEND THE LENGTH OF THE PROPOSED PARKING LOTS (PHASE I
 AND II) AS THEY ARE CONSTRUCTED.
  
  

Review Stop Z ZONING
Rev No 1 Status F Date 06-11-2018 Cont ID  
Sent By eschneid Date 06-11-2018 Time 16:34 Rev Time 5.00
Received By eschneid Date 06-11-2018 Time 16:34 Sent To  
Notes
2018-06-11 16:34:56CASE NO. PB1069Y
 KEISER UNIVERSITY EXPANDED PARKING LOT
 2600 N. MILITARY TRAIL
  
 - CONTACT ERIC SCHNEIDER @ (561) 822-1446
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF FIVE
 (5) PAPER COPIES AND AN ELECTRONIC COPY IN .PDF FORMAT
 OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS
 TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL
 COMMENTS.
  
 - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT
 RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS
 FROM THE DATE OF THESE COMMENTS/THE PPRC MEETING (BY
 AUGUST 13, 2018), THE CASE SHALL BE CONSIDERED
 WITHDRAWN. ANY FURTHER ACTION SHALL REQUIRE A NEW
 DEVELOPMENT APPLICATION.
  
 - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($300).
  
 1) THE MASTER PLAN SHOULD CONTINUE TO SHOW THE EXPANDED
 PHASE II OF THE PARKING AREA AS PROPOSED BUILDING 15
 (FUTURE CLASSROOM BUILDING) TO RETAIN MAXIMUM SITE
 DEVELOPMENT FLEXIBILITY UNDER THE APPROVED MASTER PLAN.
 BUILDINGS BUILT IN THE LOCATION SHOWN ON THE MASTER
 PLAN ARE PERMITTED TO BE APPROVED AS A FORMAL SITE PLAN
 AND DO NOT REQUIRE CITY COMMISSION APPROVAL.
  
 2) THE EXISTING SIDEWALK ON THE SOUTH SIDE OF
 UNIVERSITY DRIVE NEEDS TO EXTEND THE LENGTH OF THE
 PROPOSED PARKING LOTS (PHASE I AND II) AS THEY ARE
 CONSTRUCTED.
  
 3) PLEASE CONSIDER EXTENDING A SIDEWALK, SEPARATED FROM
 THE TRAVEL LANE, FROM THE MAIN CAMPUS ENTRANCE AT
 MILITARY TRAIL TO POINT THE SIDEWALK WILL END BASED ON
 COMMENT NO. 2. PALMTRAN HAS TOLD THE CITY THAT THE STOP
 BY THE MAIN ENTRANCE IS HEAVILY USED, SO A SIDEWALK
 PROVIDES A SAFE CONNECTION TO THE CAMPUS.
  
 4) YOU SHOULD CONSIDER HAVING AN ADDITIONAL ENTRY POINT
 TO THE PARKING LOT FOR UNIVERSITY DRIVE FOR PHASE II OF
 THE PARKING LOT.
  
 5) PLEASE CONSIDER USING CURBS WITH A TWO FOOT OVERHANG
 INSTEAD OF WHEEL STOPS AT THE END OF THE PARKING
 SPACES. THE DRAINAGE PLAN SHOWS THAT THE PARKING LOT IS
 SLOPED TO THE MIDDLE OF THE DRIVE AISLES, SO THERE IS
 NO SHEET FLOW IMPACT OF CURBING THE PARKING SPACES.
  
 6) PROVIDE THE DIMENSIONS ACROSS THE PARKING AISLES AND
 ROWS TO PROVIDE VERIFICATION THAT THEY MEET MINIMUM
 REQUIREMENTS. THIS WAS DONE ON THE PLANS THAT WERE
 APPROVED BY RESOLUTION NO. 48-18.
  
 7) PROVIDE A DETAIL OF HOW THE PARKING LOT WILL LOOK
 WITH ONLY PHASE I CONSTRUCTED. THIS NEEDS TO INCLUDE
 THE ACTUAL NUMBER OF PARKING SPACES (THE HEAVY LINE ON
 SHEET MP.3 SHOWS MORE SPACES THAN THE LISTED 129 IN
 PHASE I), HOW THE DRIVE AISLES ARE ARRAIGNED, HOW THE
 LANDSCAPE WILL BE INSTALLED TO MEET PARKING CODE
 REQUIREMENTS, ETC.
  
 8) THE MASTER PLAN DRAWINGS DO NOT SHOW THE UNIVERSITY
 DRIVE CROSSWALK.
  
 9) PLEASE CONSIDER RELOCATING THE SPEED HUMP AND
 INSTALLING IT AS A TABLE TOP WITH A CROSSWALK. THIS
 WILL PROVIDE ENHANCED PEDESTRIAN SAFETY CROSSING
 UNIVERSITY DRIVE.
  
 10) THE PHASE II PARKING LOT LAYOUT AND ITS
 RELATIONSHIP TO THE DEVOS-COOK ACADEMIC CENTER LENDS
 ITSELF TO PEOPLE CUTTING ACROSS THE LANDSCAPED AREA
 BETWEEN THE PARKING AND UNIVERSITY DRIVE. PLEASE
 CONSIDER ADDING A COUPLE PEDESTRIAN CONNECTIONS TO
 UNIVERSITY DRIVE AND ACROSS TO THE SIDEWALK REQUIRED BY
 COMMENT NO. 2.
  
 11) THE PHOTOMETRIC PLAN NEEDS TO CONTINUE TO THE
 PROPERTY LINE. PLEASE SHOW THAT THERE WILL BE LESS THAN
 ONE FOOTCANDLE AT THE PROPERTY LINE AND THAT THERE WILL
 BE NO GLARE ONTO THE RESIDENTIAL PROPERTY TO THE NORTH.
  
 12) THE LIGHT POLES NEED TO BE SET BACK A MINIMUM OF 15
 FEET FROM THE NORTHERN (SIDE) PROPERTY LINE. THERE IS
 ONE LIGHT POLE THAT IS LESS THAN 10 FEET FROM THE
 PROPERTY LINE AND ONE THAT IS CLOSE TO 15 FEET FROM THE
 NORTHERN PROPERTY LINE. ONE LIGHT POLE NEEDS TO BE
 RELOCATED AND THE OTHER NEEDS TO HAVE THE DIMENSION TAG
 INCLUDED TO VERIFY THAT IT MEETS THE 15 FOOT SETBACK
 REQUIREMENT.
  
 13) AT ONE POINT THERE WAS DISCUSSION OF THE TEMPORARY
 BLEACHER LAYOUT BEFORE THE PERMANENT BLEACHERS WITH
 PRESS BOX IS CONSTRUCTED. IS THIS STILL THE PLAN,
 PLEASE SUBMIT A SHEET SHOWING THIS CONFIGURATION SO
 THAT STAFF CAN REVIEW FOR COMPLIANCE WITH THE SITE
 DEVELOPMENT REGULATIONS.
  
 14) THE ADDITIONAL LIVE OAK AND BUTTONWOOD TREES SHOWN
 ALONG THE WESTERN PROPERTY LINE ARE SPECIFIED AT THE
 CODE MINIMUM OF 12 FEET. IN RESOLUTION NO. 48-18, THE
 CITY COMMISSION REQUIRED THAT THE ADDITIONAL CANOPY
 TREES ALONG THE WESTERN PROPERTY LINE ARE TO ENHANCE
 THE RESIDENTIAL PRIVACY. IN ORDER TO MEET THIS
 DEVELOPMENT REGULATION, LARGER TREES NEED TO BE
 INSTALLED.
  
 15) RESOLUTION NO. 48-18 REQUIRES THE INSTALLATION OF
 TERMINAL LANDSCAPE ISLANDS FOR THE SOFTBALL FIELD
 PARKING ROW. THIS NEEDS TO BE SHOWN ON THE PLANS WITH
 THIS SUBMITTAL.
  
  

  Print