Plan Review Details - Project Z18030009
Plan Review Stops For Project Z18030009
Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 04-11-2018 Cont ID  
Sent By Mgonzale Date 04-11-2018 Time   Rev Time 1.00
Received By mgonzale Date 04-11-2018 Time   Sent To I
Notes
2018-04-11 12:34:24PLEASE RESPOND TO COMMENTS IN WRITING:
  
 #1 IDENTIFY FDC AND FIRELINE ON PLANS (CONTACT CAD
 GROUP FOR ASBUILTS)
 #2 TOPOGRPHIC INFORMATION TO SUBSTANTIATE ADA
 ACCESSABILITY ENTRY AND EXIT PATH TO
 #3 ANCHORING DETAILS TO CURB / SIDEWALK (CURRENT
 CONDITION OF SIDEWALK CRACKING)
 #4 WHAT PROVISIONS FOR PARKING ACCESS TO PARKING
 LOT/BLOCKING/ ROW STRIPING.
 #5 CONFLICT WITH 10" W.M. UNDER PLATFORM
 #6 SHOW YOUR PROPOSED WATER AND SEWER SERVICE TO
 PLATFORM.
  
 MANNY GONZALEZ
 SENIOR ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS
 /FORMS,-PERMITS-APPLICATIONS
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 04-05-2018 Cont ID  
Sent By pleduc Date 04-05-2018 Time   Rev Time 0.00
Received By pleduc Date 04-05-2018 Time 14:23 Sent To  
Notes
2018-04-05 15:31:08THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC,
 FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM
 BEACH FIRE RESCUE.
  
 THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE
 DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE.
 ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS
 ARE SUBMITTED FOR PERMIT.
  
 THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE
 PROPOSED PROJECT.
  
  
 1) THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH
 THE 6TH EDITION OF THE FLORIDA FIRE PREVENTION CODE,
 INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES.
  
  
 2) THE PROPOSED PROJECT ENCROACHES INTO THE EXISTING
 ROADWAY WITH A DIMENSION OF 12'10" TO THE CENTERLINE OF
 THE ROADWAY.
  
 ENSURE THE CENTERLINE AND ROADWAY STRIPING PROVIDES A
 MINIMUM OF 12' TRAVEL PATH FOR EMERGENCY VEHICLES.
  
  
 3) THE PROPOSED PROJECT ENCROACHES INTO THE EXISTING
 ROADWAY. THOUGH NOT SPECIFICALLY ADDRESSED IN THE FIRE
 CODE, TRAFFIC CALMING DEVICES, SUBSTANTIAL CONSTRUCTION
 ELEMENTS AND/OR REFLECTIVE OE ELECTRIC WARNING
 SIGNS/LIGHTS.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  

Review Stop L LANDSCAPING
Rev No 1 Status F Date 04-09-2018 Cont ID  
Sent By rcaranci Date 04-09-2018 Time 15:12 Rev Time 0.00
Received By rcaranci Date 04-09-2018 Time 15:12 Sent To  
Notes
2018-04-09 15:13:12FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462
 PROJECT: 322 EVERNIA STREETSCAPE IMPROVEMENTS Z18030009
 APRIL 9, 2018
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. IF ANY PLANT MATERIAL IS PROPOSED AS PART OF THE
 IMPROVEMENTS, IT MUST BE MAINTAINED PER CITY CODE
 SECTION 94-446 AND BE IRRIGATED AS NECESSARY. PLEASE
 SUPPLY LANDSCAPE AND IRRIGATION PLANS.
  

Review Stop STORM STORMWATER
Rev No 1 Status F Date 04-10-2018 Cont ID  
Sent By tward Date 04-10-2018 Time 11:19 Rev Time 0.00
Received By tward Date 04-10-2018 Time 11:20 Sent To  
Notes
2018-04-10 11:19:06THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT HTTP://WPB.ORG/DEPARTMENTS/ENGINEE
 RING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 1. WHY IS PARKLET NOT PARALLEL TO CENTERLINE OF ROAD?
  
 2. SHOW EXISTING UTILITIES ON THE SITE PLAN.
  
 3. THE CITY VERTICAL DATUM IS NGVD 1929. THE CITY HAS
 ALLOWED THE USE OF NAVD 1988 PROVIDED THE CONVERSION
 EQUATION TO NGVD 1929 IS PROVIDED. SHOW THE DATUM
 CONVERSION ON THE SURVEY.
  
 4. UPDATE THE FLOOD ZONE INFORMATION ON THE SURVEY.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE
 ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  
  
  
  

Review Stop SURVEY SURVEYING
Rev No 1 Status F Date 04-09-2018 Cont ID  
Sent By vnoel Date 04-09-2018 Time 09:45 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
2018-04-09 09:49:461. HOW IS ACCESS TO EXISTING
 METERS/UTILITIES/IRRIGATION TO BE MAINTAINED?
 2. IS THERE AN AGREEMENT WITH ADJACENT OWNER?
 3. HAS PARKING BEEN NOTIFIED AS TO LOSS OF PARKING
 SPACES?

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status F Date   Cont ID  
Sent By   Date 04-11-2018 Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
2018-04-11 12:53:00PAGE S2
 1. SHOW HOW ACCESS WILL BE MAINTAIN TO THE EXISTING
 WATER METERS
 PAGE S3
 2. SIGNS NEED TO BE ADD AT BOTH ENDS OF THE GARDEN TO
 SHOW IT IS A PUBLIC AREA.
 3. ADD DETECTABLE WARNING SURFACE TO BOTH ENDS OF THE
 ADA RAMPS.
 4. DRAINAGE NEEDS TO BE EVALUATED TO MAKE SURE A FLOW
 LINE WILL BE MAINTAIN.
 5. HOW AND WHO IS GOING TO BE PERFORMANCE MAINTENANCE
 UNDER THE DECK TO KEEP THE FLOW LINE CLEAN FROM TRASH
 AND DEBRIS.
 6. SITE PLAN NEEDS TO SHOW BOTH SIDE OF EVERNIA ST FROM
 DIXIE HWY TO EAST OF THE DRIVEWAY.
 7. THE CURB ON THE ADJACENT SIDE OF EVERNIA NEEDS TO BE
 SHOWN ON THE SITE PLAN.
 8. SHOW ALL UNDERGROUND UTILITIES
 PAGE S5
 9. THERE IS NO S7 SECTION FOR THE TYPICAL PLATFORM
 SLEEVE ANCHOR DETAIL. ALSO THE SAME DETAIL CALLS FOR
 PAVEMENT OR SIDEWALK BUT THE CITY DOES NOT ALLOW ANY
 ANCHOR INTO THE PAVEMENT JUST THE SIDEWALK OR CURB.
 10. EVERNAI MAY POTENTIALLY BE A STREETSCAPE PROJECT
 WITH THE UPCOMING CRA BOND. DOES IT MAKE SENSE TO
 CONSTRUCT THIS PROJECT IF IT WOULD BE REMOVED FOR A
 STREETSCAPE PROJECT?
  
 ERIK D. FERGUSON, PE
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]

Review Stop Z ZONING
Rev No 1 Status F Date 04-11-2018 Cont ID  
Sent By aaponte Date 04-11-2018 Time 12:39 Rev Time 0.00
Received By aaponte Date   Time   Sent To  
Notes
2018-04-11 12:46:111. STAFF HAS CONCERNS ABOUT THE PERCEPTION OF THE DECK
 AS A PRIVATE SPACE.
 2. PLEASE DISCUSS WITH ABT THE DETAISL ABOUT THE
 ALCOHOL EXTENSION INTO THE SIDEWALK . IS IS ALLOWED
 BEYOND THE INMEDIATE FRONTAGE OF THE BUSINESS?
 3. NOTE THAT CURRENT BUILDING ENTRANCE DOOR IS FLUSH
 WITH SIDEWALK. DECK WILL RAISE THE SIDEWALK LEVEL AND
 CREATE A CONFLICT WITH ENTRANCE DOOR AND ADA ACCESS TO
 COMMERCIAL SPACE.
 4. WHAT IS THE PROPOSED APPROVAL PROCESS FOR THE
 PROJECT? DOES NOT MEET REQUIREMENTS OF PRIVATE PARKLET.
 IT IS A CITY PROJECT?
 5. HOW CLOSE IS THE PROPOSED DECK TO THE TRAVEL LANE?
 6. PROPOSED DECK IS COVERING UTILITIES