| Plan Review Stops For Project Z18020020 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
03-13-2018 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
03-13-2018 |
Time |
20:29 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
03-13-2018 |
Time |
20:29 |
Sent To |
|
|
| Notes |
| 2018-03-13 20:30:51 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR THE BUILDING PERMIT APPLICATION. | | | | | | 2. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE. | | | | | | 3. BUILDING LOCATION RELATIVE TO THE PROPERTY LINE AND | | | OTHER STRUCTURES. WHEN SUBMITTED FOR BUILDING PERMIT, | | | COMPLIANCE WITH ALL BUILDING SEPARATION, PERCENTAGE OF | | | OPENINGS AND OPENING PROTECTIVE REQUIREMENTS OF | | | CHAPTERS 6 AND 7 OF THE FLORIDA BUILDING CODE SHALL BE | | | VERIFIED. | | | | | | 4. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, GAS SYSTEMS, GENERATORS, FIRE ALARM SYSTEMS, | | | FIRE SPRINKLER AND OTHER FIRE SUPPRESSION SYSTEMS, | | | GREASE INTERCEPTORS, SITE LIGHTING, SITE LANDSCAPE, | | | SITE IRRIGATION, ETC. | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
03-14-2018 |
|
|
Cont ID |
|
| Sent By |
mgonzale |
Date |
03-14-2018 |
Time |
|
Rev Time |
0.00 |
| Received By |
mgonzale |
Date |
03-14-2018 |
Time |
13:07 |
Sent To |
|
|
| Notes |
| 2018-03-14 13:09:36 | #1 DEPTH AND LOCATION OF DUMSPTER NEEDS REVIEW. | | | | | | #2 EXISTING WATERMAIN WILL REQUIRE EASEMENT AND CAUTION | | | AS TO ANY PROPOSED LANDSCAPING. | | | CITY OF WPB UTILITIES WILL REQUIRE A MEETING TO SEE | | | ABOUT THE POSIBILITY AS TO ITS ABANDONMENT. | | | | | | MANNY GONZALEZ | | | SENIOR ENGINEERING PROJECT COORDINATOR | | | PUBLIC WORKS DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | EMAIL: [email protected] | | | HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS | | | /FORMS,-PERMITS-APPLICATIONS | | | | | | IMPORTANT MESSAGE: AS OF DECEMBER 20, 2015 THE CITY OF | | | WEST PALM BEACH | | | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, | | | MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD | | | FREE." | | | FOR MORE INFORMATION REFER TO THE LINK BELOW: | | | HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI | | | CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
03-09-2018 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
03-09-2018 |
Time |
10:01 |
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
03-09-2018 |
Time |
09:50 |
Sent To |
|
|
| Notes |
| 2018-03-09 10:00:54 | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, | | | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM | | | BEACH FIRE RESCUE. | | | | | | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE | | | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. | | | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS | | | ARE SUBMITTED FOR PERMIT. | | | | | | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE | | | PROPOSED PROJECT. | | | | | | 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY | | | WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE | | | PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A | | | PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED | | | TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN | | | STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY | | | MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER | | | PROTECTION. | | | | | | 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY | | | IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING | | | ALL CONSTRUCTION ACTIVITIES. | | | | | | 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM | | | ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION. | | | ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND | | | AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT | | | WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS. | | | | | | 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE | | | REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE | | | ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS. | | | | | | 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH | | | THE 6TH EDITION OF THE FLORIDA FIRE PREVENTION CODE, | | | INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES. | | | | | | 6. FOR PLAN REVIEW SUBMITTAL, PLEASE INCLUDE THE | | | OCCUPANCY TYPE, PER THE FLORIDA FIRE PREVENTION CODE, | | | AND IF APPLICABLE ,WHETHER IT WILL BE MIXED OR | | | SEPARATED OCCUPANCY. | | | | | | 7. FOR PLAN REVIEW SUBMITTAL, PLEASE ENSURE THAT A FIRE | | | LOAD CALCULATION IS INCLUDED AND THAT ADEQUATE WATER | | | SUPPLY IS EXISTING OR WILL BE PROVIDED. | | | | | | 8. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED | | | ON THE PLAN AND, IF NEEDED, CLOSELY COORDINATED WITH | | | THE BUREAU OF FIRE PREVENTION. | | | | | | 9. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL | | | BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL | | | DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS, | | | EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A | | | PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE | | | SAFETY FEATURES AND EQUIPMENT. | | | | | | 10. IT IS HIGHLY RECOMMENDED FOR ANY 24 HOUR EMERGENCY | | | ACCESS NEEDS THAT A KNOX BOX BE PROVIDED WITH KEYS FOR | | | EACH SUITE. | | | | | | 11. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT | | | DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | 12. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING | | | PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH | | | THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
P |
Date |
04-30-2018 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
04-30-2018 |
Time |
17:02 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
04-30-2018 |
Time |
17:02 |
Sent To |
|
|
| Notes |
| 2018-04-30 17:02:55 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 | | | PROJECT: 6500 S DIXIE Z18020020 | | | APRIL 30, 2018 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | | | | 1. SATISFIED. PLEASE CORRECT THE REQUIRED OPEN SPACE TO | | | 40 PERCENT OF THE TOTAL SITE, AND RECALCULATE REQUIRED | | | TREES AND FLOWERING TREES TO CURRENT CODE OF 1 TREE PER | | | 1500 SQ FT OF REQUIRED OPEN SPACE OR PORTION THEREOF, | | | AND FLOWERING TREES TO ONE PER 6000 SQ FT OR PORTION | | | THEREOF PER SECTION 94-442(C)(2)B. | | | | | | 2. SATISFIED. PLEASE SHOW AND LABEL THE REQUIRED 5 FOOT | | | LANDSCAPE BUFFER ON ALL SIDES ADJACENT TO THE PROPERTY | | | LINES ON THE SITE AND LANDSCAPE PLANS. | | | | | | 3. SATISFIED. PLEASE PROVIDE THE BUFFER REQUIREMENTS | | | AND CALCULATIONS ON THE PLAN. ONE TREE PER 30 LF OR | | | PORTION THEREOF IS REQUIRED. LARGER TREE SPECIES MUST | | | BE USED WHERE POSSIBLE TO PROVIDE BUFFERING TO ADJACENT | | | PROPERTIES AND PROVIDE SHADE FOR PARKING AREAS. SOUTH | | | LANDSCAPE BUFFER MUST MEET REQUIREMENTS COMPATIBLE WITH | | | THE UTILITY EASEMENT. | | | | | | 4. SATISFIED. PLEASE ADD A COLUMN FOR DROUGHT TOLERANCE | | | TO THE PLANT LIST AND PROVIDE THE LEVEL FOR EACH | | | SPECIES, AND IF THE SPECIES IS NATIVE. | | | | | | 5. SATISFIED. PLEASE PROVIDE A TREE AS REQUIRED IN A | | | TERMINAL LANDSCAPE ISLAND AT THE END OF EACH ROW OF | | | PARKING SPACES. LARGER TREE SPECIES MUST BE USED WHERE | | | POSSIBLE TO PROVIDE BUFFERING TO ADJACENT PROPERTIES | | | AND PROVIDE SHADE FOR PARKING AREAS. | | | | | | 6. SATISFIED. PLEASE PROVIDE THE PERVIOUS LANDSCAPE | | | AREA SQUARE FOOTAGE ON THE LANDSCAPE PLAN. | | | | | | 7. SATISFIED. PLEASE UPDATE FLORIDA FRIENDLY LANDSCAPE | | | POINTS TO SHOW CURRENT APPLICABLE CODE REQUIRES 40 | | | POINTS. | | | | | | 8. SATISFIED. PLEASE SHOW CALCULATION OF PERCENTAGE OF | | | PALMS SUBSTITUTED FOR REQUIRED TREES, NOT TO EXCEED 35 | | | PERCENT. | | | | | | 9. SATISFIED. PLEASE SHOW CALCULATIONS FOR THE BUILDING | | | FOR COMPLIANCE WITH 30 PERCENT PERIMETER LANDSCAPE PER | | | SECTION 94-443(E)(1). | | | | | | 10. SATISFIED. PLEASE SHOW ALL WATER, SEWAGE AND | | | DRAINAGE LINES ON THE LANDSCAPE PLAN. | | | | | | 11. SATISFIED. PLEASE SHOW LOCATIONS OF ROOT BARRIERS | | | TO PROTECT INFRASTRUCTURE AND TREES FROM CONFLICTS. | | | THIS INCLUDES WATER, SEWER, DRAINAGE, SIDEWALKS AND | | | CURBS, AND ANY FIELD STRUCTURES THAT COULD BE IMPACTED | | | BY TREE ROOTS. | | | | | | 12. SATISFIED. PLEASE SHOW LOCATIONS OF ANY FPL | | | TRANSFORMERS ON THE LANDSCAPE PLAN. | | | | | | 13. SATISFIED. PLEASE PROVIDE SCREENING FOR ALL GROUND | | | MOUNTED EQUIPMENT AND UTILITIES. WATER BACKFLOW VALVES | | | AND FPL TRANSFORMERS MUST HAVE SCREENING HEDGES. | | | | | | 14. SATISFIED. PLEASE PROVIDE THE LOCATIONS OF LIGHTING | | | ON THE LANDSCAPE PLAN TO PREVENT CONFLICTS WITH TREES. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
03-13-2018 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
03-13-2018 |
Time |
11:31 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
03-13-2018 |
Time |
11:31 |
Sent To |
|
|
| Notes |
| 2018-03-13 11:31:52 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 | | | PROJECT: 6500 S DIXIE Z18020020 | | | MARCH 12, 2018 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | | | | 1. PLEASE CORRECT THE REQUIRED OPEN SPACE TO 40 PERCENT | | | OF THE TOTAL SITE, AND RECALCULATE REQUIRED TREES AND | | | FLOWERING TREES TO CURRENT CODE OF 1 TREE PER 1500 SQ | | | FT OF REQUIRED OPEN SPACE OR PORTION THEREOF, AND | | | FLOWERING TREES TO ONE PER 6000 SQ FT OR PORTION | | | THEREOF PER SECTION 94-442(C)(2)B. | | | | | | 2. PLEASE SHOW AND LABEL THE REQUIRED 5 FOOT LANDSCAPE | | | BUFFER ON ALL SIDES ADJACENT TO THE PROPERTY LINES ON | | | THE SITE AND LANDSCAPE PLANS. | | | | | | 3. PLEASE PROVIDE THE BUFFER REQUIREMENTS AND | | | CALCULATIONS ON THE PLAN. ONE TREE PER 30 LF OR PORTION | | | THEREOF IS REQUIRED. LARGER TREE SPECIES MUST BE USED | | | WHERE POSSIBLE TO PROVIDE BUFFERING TO ADJACENT | | | PROPERTIES AND PROVIDE SHADE FOR PARKING AREAS. SOUTH | | | LANDSCAPE BUFFER MUST MEET REQUIREMENTS COMPATIBLE WITH | | | THE UTILITY EASEMENT. | | | | | | 4. PLEASE ADD A COLUMN FOR DROUGHT TOLERANCE TO THE | | | PLANT LIST AND PROVIDE THE LEVEL FOR EACH SPECIES, AND | | | IF THE SPECIES IS NATIVE. | | | | | | 5. PLEASE PROVIDE A TREE AS REQUIRED IN A TERMINAL | | | LANDSCAPE ISLAND AT THE END OF EACH ROW OF PARKING | | | SPACES. LARGER TREE SPECIES MUST BE USED WHERE POSSIBLE | | | TO PROVIDE BUFFERING TO ADJACENT PROPERTIES AND PROVIDE | | | SHADE FOR PARKING AREAS. | | | | | | 6. PLEASE PROVIDE THE PERVIOUS LANDSCAPE AREA SQUARE | | | FOOTAGE ON THE LANDSCAPE PLAN. | | | | | | 7. PLEASE UPDATE FLORIDA FRIENDLY LANDSCAPE POINTS TO | | | SHOW CURRENT APPLICABLE CODE REQUIRES 40 POINTS. | | | | | | 8. PLEASE SHOW CALCULATION OF PERCENTAGE OF PALMS | | | SUBSTITUTED FOR REQUIRED TREES, NOT TO EXCEED 35 | | | PERCENT. | | | | | | 9. PLEASE SHOW CALCULATIONS FOR THE BUILDING FOR | | | COMPLIANCE WITH 30 PERCENT PERIMETER LANDSCAPE PER | | | SECTION 94-443(E)(1). | | | | | | 10. PLEASE SHOW ALL WATER, SEWAGE AND DRAINAGE LINES ON | | | THE LANDSCAPE PLAN. | | | | | | 11. PLEASE SHOW LOCATIONS OF ROOT BARRIERS TO PROTECT | | | INFRASTRUCTURE AND TREES FROM CONFLICTS. THIS INCLUDES | | | WATER, SEWER, DRAINAGE, SIDEWALKS AND CURBS, AND ANY | | | FIELD STRUCTURES THAT COULD BE IMPACTED BY TREE ROOTS. | | | | | | 12. PLEASE SHOW LOCATIONS OF ANY FPL TRANSFORMERS ON | | | THE LANDSCAPE PLAN. | | | | | | 13. PLEASE PROVIDE SCREENING FOR ALL GROUND MOUNTED | | | EQUIPMENT AND UTILITIES. WATER BACKFLOW VALVES AND FPL | | | TRANSFORMERS MUST HAVE SCREENING HEDGES. | | | | | | 14. PLEASE PROVIDE THE LOCATIONS OF LIGHTING ON THE | | | LANDSCAPE PLAN TO PREVENT CONFLICTS WITH TREES. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
P |
Date |
03-15-2018 |
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2018-03-15 08:07:29 | SPOKE WITH OWNERS AT PPRC MEETING AND PER A PREVIOUS | | | DISCUSSION AT THE DPW OFFICE IT IS AGREED THEY WILL USE | | | 96 GALLON CARTS FOR THEIR SERVICE AND THE TENENT OR | | | TENENTS WILL BE RESPONSIBLE TO BRING THE CARTS TO THE | | | CURB FOR PICK UP. | | 2018-03-14 07:15:23 | BASED ON THE PLAN IT APPEARS TO SHOW THAT THE | | | SANITATION SERVICE PROPOSED IS 96 GALLON CARTS. IF THAT | | | IS TRUE THEN EITHER THE PROPERTY OWNERS/MANAGERS WOULD | | | BE RESPONSIBLE TO PLACE THEM CURBSIDE FOR PICK UP ON | | | SERVICE DAYS. | | | | | | IF YOU INTEND TO USE A DUMPSTER SERVICE THE ENCLOSRE | | | WOULD HAVE TO BE RELOCATED TO PREVENT OUR SERVICE TRUCK | | | FROM BACKING UP MORE THEN 30'. |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
P |
Date |
05-10-2018 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
05-10-2018 |
Time |
17:02 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
05-10-2018 |
Time |
17:07 |
Sent To |
|
|
| Notes |
| 2018-05-10 17:06:02 | COMMENTS BELOW ARE FROM THE REVIEW OF THE APRIL 25, | | | 2018 SUBMITTAL PACKAGE. | | | | | | 1. THOUGH NOT REQUIRED, SUGGESTION IS MADE TO INCLUDE | | | POLLUTANT RETARDANT BAFFLES (PRB'S) IN FRONT OF THE | | | EXFILTRATION TRENCHES TO PROLONG THE EFFECTIVENESS OF | | | THE EXFILTRATION TRENCH. THE SUMP IN THE CATCH BASINS | | | SHOULD BE INCREASED TO 18 INCHES OR 24 INCHES FROM 12 | | | INCHES IF PRB'S ARE INTALLED. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
03-09-2018 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
03-09-2018 |
Time |
13:44 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
03-09-2018 |
Time |
13:46 |
Sent To |
|
|
| Notes |
| 2018-03-09 13:45:43 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT | | | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT HTTP:// | | | WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PER | | | MITS-APPLICATIONS | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. THE CITY?S VERTICAL DATUM IS NGVD 1929. THE CITY HAS | | | ALLOWED THE USE OF NAVD 1988 PROVIDED THE CONVERSION | | | EQUATION TO NGVD 1929 IS PROVIDED. SHOW THE DATUM | | | CONVERSION ON THE BOUNDARY SURVEY. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL | | | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. | | | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS | | | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE | | | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS | | | | | | 2. PROVIDE SFWMD ERP FOR THE DEVELOPMENT. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
P |
Date |
05-02-2018 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
05-02-2018 |
Time |
09:41 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2018-05-02 09:42:31 | UNITY OF TITLE HAS BEEN RECORDED. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
03-12-2018 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
03-12-2018 |
Time |
13:30 |
Rev Time |
|
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2018-03-12 13:46:29 | 1. UNITY OF TITLE WILL BE REQUIRED. APPLICATION IS MADE | | | THROUGH ENGINEERING SERVICES. | | | 2. CHECK DIXIE HWY RIGHT-OF-WAY VS. FDOT MAINTENANCE | | | MAP | | | 3. PROPERTY CORNERS ON SHEET C.01 DOES NOT MATCH | | | SURVEY. | | | 4. WATER SERVICE RECORDS INDICATE PROPERTY BEING SERVED | | | BY METER IN 6' EASEMENT. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
2 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
05-21-2018 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2018-05-21 09:18:11 | PASSED | | | ERIK D. FERGUSON P.E. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
03-08-2018 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2018-03-08 17:32:58 | - PROVIDE TRAFFIC IMPACT STUDY IN ACCORDANCE WITH CITY | | | CODE SECTION 94-311 OR A TRIP GENERATION LETTER AND | | | DOCUMENTATION DEMONSTRATING THAT CITY CODE SECTION | | | 94-311(C) TRAFFIC IMPACT STUDY REQUIRED IS NOT | | | APPLICABLE. | | | - PROVIDE COUNTY TRAFFIC CONCURRENCY LETTER | | | - IT MAY BE POSSIBLE TO ADD ONE ADDITIONAL ON-STREET | | | PARKING SPACE ON S. DIXIE WITH ELIMINATION OF EXISTING | | | CURB CUT ON SOUTH DIXIE. | | | - GENERAL COMMENT IS IT POSSIBLE TO PROVIDE LANDSCAPING | | | BEHIND THE CURB ON SOUTH DIXIE IN THE EXISTING PAVER | | | STRIP INSTEAD OF LANDSCAPING BETWEEN BACK OF SIDEWALK | | | AND BUILDING? LANDSCAPING IN THIS LOCATION WOULD | | | PROVIDE MORE BENEFIT TO PEDESTRIAN THAN THE LANDSCAPING | | | BETWEEN THE BACK OF SIDEWALK AND BUILDING. NOT SURE IF | | | THIS IS CONSISTENT WITH CODE. | | | - CITY HAS NOT COMPLETED A DETAILED REVIEW DUE TO THE | | | INCOMPLETE INFORMATION PROVIDED. | | | - REDUCE DRIVEWAY WIDTH ON HUNTER TO 20'. | | | - FDOT PERMIT WILL BE REQUIRED TO REMOVE EXISTING | | | DRIVEWAY ON S. DIXIE. | | | - CAN LANDSCAPING BE INSTALLED INSTEAD OF PROPOSED | | | PAVER BLOCKS AT THE LOCATION WHERE THE EXISTING S. | | | DIXIE DRIVEWAY IS BEING REMOVED? | | | - CONSIDER PLACING DUMPSTER IN DIFFERENT LOCATION TO | | | ALLOW PARKING AISLE TO ALLOW A FUTURE CONNECTION TO | | | ADJACENT PROPERTY. THIS WOULD ALLOW THE PARKING AISLE | | | TO FUNCTION IN THE FUTURE AS AN ALLEY. | | | | | | | | | ERIK D. FERGUSON, P.E. | | | CITY TRANSPORTATION ENGINEER | | | (561) 494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
05-07-2018 |
|
|
Cont ID |
|
| Sent By |
awooten |
Date |
05-07-2018 |
Time |
15:18 |
Rev Time |
0.00 |
| Received By |
awooten |
Date |
05-07-2018 |
Time |
15:17 |
Sent To |
|
|
| Notes |
| 2018-05-07 15:17:19 | ****************************************CONDITIONAL | | | ZONING APPROVAL*********************************** | | | | | | THE FOLLOWING IS A CONDITION OF SITE PLAN APPROVAL: | | | | | | REPLACE THE ENTIRE EXISTING SIDEWALK ON SOUTH DIXIE | | | HIGHWAY WITH CONCRETE. | | | | | | ALANA WOOTEN | | | ASSOCIATE PLANNER | | | 561-822-1449 | | | [email protected] |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
03-13-2018 |
|
|
Cont ID |
|
| Sent By |
ajones |
Date |
03-13-2018 |
Time |
16:25 |
Rev Time |
0.00 |
| Received By |
ajones |
Date |
03-13-2018 |
Time |
13:14 |
Sent To |
|
|
| Notes |
| 2018-03-13 16:31:38 | CASE NO. ISPR 18-04 | | | PROJECT NAME STATE FARM BUILDING | | | ADDRESS 6500 S. DIXIE HIGHWAY | | | | | | - CONTACT ALANA WOOTEN @ (561) 822-1449 | | | | | | - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN | | | WRITTEN FORMAT. | | | | | | - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF ELEVEN | | | (11)/FIVE (5) PAPER COPIES AND AN ELECTRONIC COPY IN | | | .PNG/.PDF FORMAT OF ALL PLANS. PLEASE NOTE THAT CHANGES | | | ON THE RESUBMITTED PLANS OR THE SUBMITTAL OF | | | INFORMATION/PLANS TO ADDRESS THE COMMENTS MAY RESULT IN | | | ADDITIONAL COMMENTS. | | | | | | - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT | | | RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS | | | FROM THE DATE OF THESE COMMENTS/THE PPRC MEETING, THE | | | CASE SHALL BE CONSIDERED WITHDRAWN. ANY FURTHER ACTION | | | SHALL REQUIRE A NEW DEVELOPMENT APPLICATION. | | | | | | - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20% OF THE ORIGINAL APPLICATION FEE. | | | | | | 1. THE BICYCLE PARKING SHALL BE MOVED TO THE FRONT OF | | | THE BUILDING. | | | 2. PLEASE VERTIFY THE ON STREET PARKING COUNT. | | | 3. WHEN REFORMING THE SIDEWALK ON DIXIE, REPLACE THE | | | PAVERS BRICKS WITH CONCRETE. | | | | | | | | | |
|
|
| |