Plan Review Details - Project Z17080019
Plan Review Stops For Project Z17080019
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 09-19-2017 Cont ID  
Sent By rbrown Date 09-19-2017 Time 19:34 Rev Time 0.00
Received By rbrown Date 09-19-2017 Time 19:34 Sent To  
Notes
2017-09-19 19:37:09DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR PERMITTING.
  
 2. THE DESIGN OF ACCESSIBLE PARKING SPACES SHALL COMPLY
 WITH SECTION 502 OF FLORIDA ACCESSIBILITY CODE.
  
 3. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION,
 ETC.
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status P Date 09-14-2017 Cont ID  
Sent By squinone Date 09-14-2017 Time   Rev Time 0.00
Received By squinone Date 09-14-2017 Time   Sent To  
Notes
2017-09-14 14:58:51CITY OF WEST PALM BEACH
 ENGINEERING SERVICES DEPARTMENT
 DATE: 09/20/2017
 PROJECT: CARDINAL NEWMAN HIGH SCHOOL ? PARKING
 RECONFIGURATION
 ADDRESS: 512 SPENCER DRIVE
 STATUS: PASSED
  
 THIS IS AN INITIAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS, AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 1. ROOT BARRIERS MAY BE REQUIRED WHERE PLANTINGS ARE
 NEAR UNDERGROUND STORMWATER, SANITARY, OR POTABLE WATER
 LINES;
  
 2. SHOW ON THE SITE PLANS ADA ACCESSIBLE RAMPS ON THE
 SIDEWALK AT EACH ENTRANCE AND EXIT;
  
 AFTER THE SITE PLAN IS APPROVED, IN THE NEXT PHASE, THE
 FOLLOWING GENERAL COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL:
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED FROM THE FOLLOWING WEBSITE LINK:
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 2. PLEASE SUBMIT THE LATEST VERSION OF THE ?AUTO-CALC
 CERTIFIED COST ESTIMATE FORM? FOR SUBMISSION TO CITY OF
 WEST PALM BEACH PUBLIC WORKS DEPARTMENT FOR ADDITIONAL
 WORK PROPOSED. THIS FORM CAN BE DOWNLOADED FROM THE
 FOLLOWING LINK:
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 3. FIRE HYDRANT FLOW TEST DATA FROM EXISTING FIRE
 HYDRANT WILL BE REQUIRED PART OF THE PLAN SUBMITTAL.
 SHOW HYDRANT FLOW TEST DATA RESULT ON THE PLANS;
  
 4. PLEASE INCLUDE THE LATEST VERSION OF THE APPLICABLE
 CITY OF WEST PALM BEACH STANDARD UTILITY DETAILS TO THE
 DETAIL SHEET/S DURING SUBMISSION OF THE FINAL
 ENGINEERING PLANS. CONTACT THE ENGINEERING SERVICES
 DEPARTMENT FOR THE LATEST REVISED DETAILS IN CAD
 FORMAT. CITY?S STANDARD DETAILS (IN PDF FILE FORMAT)
 CAN BE DOWNLOADED FROM THE FOLLOWING SITE:
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 5. IN THE FINAL PLANS, MUST PROVIDE UTILITY CONFLICT
 TABLE (BOTTOM AND TOP OF CROSSING PIPES) AT THE
 CONFLICT POINTS OF ALL WATER, STORM AND SANITARY SEWER
 PIPES AS WELL AS OTHER FRANCHISE UTILITIES;
  
 SOFIA QUINONES-BENEJAM, EI
 PROJECT ENGINEER
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33402
 (MAILING ADDRESS: PO BOX 3366)
 P: 561.494.1108
 C: 561.459.6518
 F: 561.494.1116
 EMAIL: [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 09-13-2017 Cont ID  
Sent By scaldero Date 09-13-2017 Time 14:18 Rev Time 0.00
Received By scaldero Date 09-13-2017 Time 14:17 Sent To  
Notes
2017-09-13 14:18:28THE FOLLOWING COMMENTS WERE SUBMITTED BY SUE ELLEN
 CALDERON, ASST. FIRE MARSHAL, BUREAU OF FIRE
 PREVENTION, WEST PALM BEACH FIRE RESCUE.
  
 THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE
 DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE.
 ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS
 ARE SUBMITTED FOR PERMIT.
  
 THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE
 PROPOSED PROJECT.
  
 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY
 WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE
 PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A
 PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED
 TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN
 STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY
 MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER
 PROTECTION.
  
 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY
 IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING
 ALL CONSTRUCTION ACTIVITIES.
  
 3. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE
 REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE
 ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS.
  
 4. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS
 DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED
 ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF
 FIRE PREVENTION.
  
 5. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT DOES
 NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL.
  
 6. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING PLANS
 AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH THE
 REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
  
  
 SUE ELLEN CALDERON
 ASST. FIRE MARSHAL
 [email protected]
  
  

Review Stop L LANDSCAPING
Rev No 2 Status P Date 12-14-2017 Cont ID  
Sent By rcaranci Date 12-14-2017 Time 15:51 Rev Time 0.00
Received By rcaranci Date 12-14-2017 Time 15:51 Sent To  
Notes
2017-12-14 15:52:15FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462
 MEMO TO FILE
 PROJECT: CARDINAL NEWMAN HS Z17080019
 DECEMBER 14, 2017
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. SATISFIED. PARKING LOT LANDSCAPE AREAS MUST MEET THE
 REQUIREMENTS OF SECTION 94-443(C)(3) AND (4). PLEASE
 SHOW ALL CALCULATIONS AND PROVIDE A DIAGRAM SHOWING THE
 AREAS COUNTED TOWARD THIS REQUIREMENT.
  
 2. SATISFIED. PLEASE SHOW LOCATIONS OF ROOT BARRIERS TO
 PROTECT INFRASTRUCTURE AND TREES FROM CONFLICTS. THIS
 INCLUDES WATER, SEWER, DRAINAGE, SIDEWALKS AND CURBS,
 AND ANY FIELD STRUCTURES THAT COULD BE IMPACTED BY TREE
 ROOTS.
  
 3. SATISFIED. PLEASE ADJUST THE LOCATIONS OF LIGHTING
 ON THE LANDSCAPE PLAN TO PREVENT CONFLICTS WITH
 REQUIRED TREES.
  
 4. SATISFIED. PLEASE PROVIDE THE REQUIRED SHADE TREE OR
 SUBSTITUTION OF PALMS AT 3:1 FOR EACH TERMINAL
 LANDSCAPE ISLAND. THERE ARE THREE ISLANDS MISSING
 TREES, AND TEN ISLANDS WITHOUT THE REQUIRED THREE PALM
 SUBSTITUTION.
  
 5. SATISFIED. THE FUTURE PARKING MUST EITHER BE PART OF
 THE APPROVAL OR NOT. STAFF SUGGESTS A CONSTRUCTION
 PHASING LINE IF IT IS TO BE PERMITTED SEPARATELY FOR
 CONSTRUCTION.
  
 6. SATISFIED. PLEASE INDICATE THE LOCATION OF WHEEL
 STOPS OR PARKING OVERHANG INTO LANDSCAPE AREAS
 ACCORDING TO THE LENGTH OF THE PROPOSED PARKING SPACES.
  
 7. SATISFIED. PLEASE PROVIDE AN UPDATED CHART SHOWING
 COMPLIANCE WITH FLORIDA FRIENDLY LANDSCAPING PER
 SECTION 94-442 (G). THIS INCLUDES SHOWING DROUGHT
 TOLERANCE LEVEL AND NATIVE SPECIES ON THE PLANT LIST
 AND PROVIDING THE REQUIRED 40 POINTS.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop L LANDSCAPING
Rev No 1 Status F Date 09-07-2017 Cont ID  
Sent By rcaranci Date 09-07-2017 Time 10:27 Rev Time 0.00
Received By rcaranci Date 09-07-2017 Time 10:27 Sent To  
Notes
2017-09-07 10:27:37FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462
 MEMO TO FILE
 PROJECT: CARDINAL NEWMAN HS Z17080019
 SEPTEMBER 7, 2017
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. PARKING LOT LANDSCAPE AREAS MUST MEET THE
 REQUIREMENTS OF SECTION 94-443(C)(3) AND (4). PLEASE
 SHOW ALL CALCULATIONS AND PROVIDE A DIAGRAM SHOWING THE
 AREAS COUNTED TOWARD THIS REQUIREMENT.
  
 2. PLEASE SHOW LOCATIONS OF ROOT BARRIERS TO PROTECT
 INFRASTRUCTURE AND TREES FROM CONFLICTS. THIS INCLUDES
 WATER, SEWER, DRAINAGE, SIDEWALKS AND CURBS, AND ANY
 FIELD STRUCTURES THAT COULD BE IMPACTED BY TREE ROOTS.
  
 3. PLEASE ADJUST THE LOCATIONS OF LIGHTING ON THE
 LANDSCAPE PLAN TO PREVENT CONFLICTS WITH REQUIRED
 TREES.
  
 4. PLEASE PROVIDE THE REQUIRED SHADE TREE OR
 SUBSTITUTION OF PALMS AT 3:1 FOR EACH TERMINAL
 LANDSCAPE ISLAND. THERE ARE THREE ISLANDS MISSING
 TREES, AND TEN ISLANDS WITHOUT THE REQUIRED THREE PALM
 SUBSTITUTION.
  
 5. THE FUTURE PARKING MUST EITHER BE PART OF THE
 APPROVAL OR NOT. STAFF SUGGESTS A CONSTRUCTION PHASING
 LINE IF IT IS TO BE PERMITTED SEPARATELY FOR
 CONSTRUCTION.
  
 6. PLEASE INDICATE THE LOCATION OF WHEEL STOPS OR
 PARKING OVERHANG INTO LANDSCAPE AREAS ACCORDING TO THE
 LENGTH OF THE PROPOSED PARKING SPACES.
  
 7. PLEASE PROVIDE AN UPDATED CHART SHOWING COMPLIANCE
 WITH FLORIDA FRIENDLY LANDSCAPING PER SECTION 94-442
 (G). THIS INCLUDES SHOWING DROUGHT TOLERANCE LEVEL AND
 NATIVE SPECIES ON THE PLANT LIST AND PROVIDING THE
 REQUIRED 40 POINTS.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop PARK PARKING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop POLICE POLICE
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PW PUBLIC WORKS
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop STORM STORMWATER
Rev No 2 Status P Date 12-18-2017 Cont ID  
Sent By tward Date 12-18-2017 Time 11:19 Rev Time 0.00
Received By tward Date 12-18-2017 Time 11:48 Sent To  
Notes
2017-12-18 11:46:45THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 12/8/2017 REVIEW PACKAGE DISTRIBUTED BY LINDA LOUIE.
 UNLESS OTHERWISE NOTED, CHANGES TO THE PLANS CAN BE
 MADE AT TIME OF ENGINEERING PERMIT SUBMIITAL.
  
 1. A COUPLE OF THE CITY'S STANDARD DETAILS (GC-1, GC-5)
 HAVE LATER REVISION DATES THAN THE ONES IN THE CURRENT
 PLANS. INCLUDE THE LATEST CITY DETAILS WITH THE PLANS.
  
 2. ARE PRB'S PROPOSED IN THE DRAINAGE STRUCTURES
 ATTACHED TO EXFILTRATION TRENCHES? IF SO, PROVIDE A
 DETAIL FOR THE PRB IN THE PLANS AND THE CONSULTANT'S
 EXFILTRATION TRENCH TYPICAL DETAILS ON SHEET PE-2.2
 WILL NEED TO BE REVISED TO SHOW A SUMP DEEPER THAN 12".
  
 3. NOTE CONCRETE STRENGTH FOR MONOLITHIC SIDEWALK
 (2,500 PSI) IS DIFFERENT THAN SIDEWALK STRENGTH IN
 DETAIL GC-1 (3,000 PSI).
  
 4. IN THE STORMWATER CALCULATIONS ON SHEET PE-2.2,
 THERE IS REFERENCE TO "0.06 ACRES OF ADDITIONAL
 IMPERVIOUS AREA (INCLUDING FUTURE PARKING". IT'S MY
 UNDERSTANDING THERE IS NO LONGER A FUTURE PARKING LOT.
 PLEASE REVISE THIS NOTE TO REFLECT THIS.
  
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]

Review Stop STORM STORMWATER
Rev No 1 Status F Date 09-07-2017 Cont ID  
Sent By tward Date 09-07-2017 Time 13:24 Rev Time 0.00
Received By tward Date 09-07-2017 Time 13:26 Sent To  
Notes
2017-09-07 13:26:33THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT HTTP://
 WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PER
 MITS-APPLICATIONS
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. LABEL VERTICAL DATUM ON THE ENGINEERING PLANS AND
 PROVIDE A CONVERSION EQUATION TO NGVD1929.
  
 2. WILL THE SPEED BUMPS BE REPLACED IN THE NEW PARKING
 LOT?
  
 3. UPDATE CITY DETAILS.
  
 4. WHAT IS THE SCHEDULE FOR THE FUTURE PARKING LOT?
 WILL THE PROPOSED TREES ON THE SIDES OF THE CATCH BASIN
 IN THE PARKING LOT INTERFERE WITH THE DRAINAGE TO THE
 CATCH BASIN IN THE FUTURE?
  
 5. CHECK THE EXFILTRATION CALCULATIONS ON SHEET PE-2.2.
 LENGTH OF TRENCH PROVIDED (605 LF) IS LESS THAN THE
 LENGTH OF TRENCH ALLOWED (REQUIRED?) (752 LF). SHEET
 PE-1.2 CALLS OUT 752 LF OF EXFILTRATION TRENCH.
  
 6. STOP BAR AND STOP SIGN MAY BE NEEDED AT INTERSECTION
 OF LONG DRIVE LANE AND CENTER DRIVE AISLE.
  
 7. CROSS WALK IS SHOWN TO HAVE 4? STRIPES INSTEAD OF
 12?/24? AS DEPICTED IN FDOT STANDARD INDEX 17346 OR 12"
 ON PBC?S T-P-13.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE
 ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 2. PROVIDE A COPY OF THE SFWMD ERP FOR THIS PROPOSED
 DEVELOPMENT.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  

Review Stop SURVEY SURVEYING
Rev No 1 Status P Date 09-15-2017 Cont ID  
Sent By vnoel Date 09-15-2017 Time 08:52 Rev Time  
Received By vnoel Date   Time   Sent To  
Notes
2017-09-15 08:55:28PASSED, BUT AT SOME POINT THIS PROPERTY SHOULD BE
 REPLATTED.

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 2 Status P Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
2017-12-12 14:26:28ERIK D. FERGUSON, P.E.
 CITY TRANSPORTATION ENGINEER

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status F Date   Cont ID  
Sent By   Date 09-18-2017 Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
2017-09-18 10:13:11BICYCLE PARKING SHALL BE REQIURED PER SECTION 94-485.
  
 ERIK D. FERGUSON, P.E.
 SENIOR PROJECT ENGINEER
 561-494-1092
 [email protected]

Review Stop Z ZONING
Rev No 2 Status P Date 12-20-2017 Cont ID  
Sent By llouie Date 12-20-2017 Time   Rev Time 0.00
Received By llouie Date 12-20-2017 Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 09-07-2017 Cont ID  
Sent By llouie Date 09-07-2017 Time   Rev Time  
Received By llouie Date 09-07-2017 Time   Sent To  
Notes
2017-09-07 16:44:55GENERAL COMMENTS:
  
 1.) PROVIDE WRITTEN CONSENT THAT THE PUBLIC UTILITIES
 DEPARTMENT HAS REVIEWED THE PROPOSAL FOR WATER, SEWAGE
 TREATMENT, STORM DRAINAGE AND GARBAGE COLLECTION
 SERVICES. PLEASE CONTACT THE CITY OF WEST PALM BEACH
 PUBLIC WORKS DEPARTMENT - ENGINEERING SERVICES, AT
 (561) 494-1040.
  
 2.) PROVIDE LETTERS FROM ALL OF THE FOLLOWING PUBLIC
 UTILITIES CONFIRMING THAT THE PROPOSED PROJECT DOES NOT
 ENCROACH INTO THEIR EASEMENTS OR OTHERWISE INTERFERE
 WITH THE PROVISIONS OF THEIR SERVICES: AT&T, FPL, FPU
 AND COMCAST.
  
  
 SITE PLAN COMMENTS:
  
 1.) PLEASE MAKE THE FOLLOWING CORRECTIONS IN THE SITE
 PLAN TABULAR (SHEET SP-1): EXISTING LAND USE AND ZONING
 IS "COMMUNITY SERVICE (CS)"; PROPOSED LAND USE AND
 ZONING IS "COMMUNITY SERVICE (CS)"; EXISTING LAND USE
 IS "SCHOOL";
  
 2.) PLEASE EXPLAIN HOW THE "REQUIRED" PARKING OF 400
 PARKING SPACES WAS TABULATED.
  
 3.) THE SITE PLAN SHOWS TWENTY (20) EXISTING PARALLEL
 PARKING SPACES ALONG THE SOUTH DRIVEWAY; HOWEVER, THE
 APPROVED SITE PLAN DOES NOT INDICATE THAT THAT PARALLEL
 PARKING SPACES HAVE BEEN APPROVED. THESE PARKING SPACES
 MUST BE REMOVED FROM THE SITE PLAN OR IF THERE IS
 SUFFICIENT SPACE ALONG THE SOUTH DRIVE, THEN THE SITE
 PLAN MUST DEMONSTRATE WITH DIMENSIONS, THAT THERE IS
 ADEQUATE SPACE TO ACCOMMODATE PARALLEL PARKING. THE
 SCOPE OF THE PROJECT (REVISED JUSTIFICATION STATEMENT)
 MUST ALSO INCLUDE PARALLEL PARKING, IF THE PARKING
 ALONG THE SOUTH DRIVE IS TO BE ADDED.
  
 4.) WIDTH OF THE DRIVE AISLES AND NEW CONCRETE
 SIDEWALKS SHALL BE DIMENSIONED IN THE SITE PLAN.
  
 5.) INCLUDE A PARKING STALL STRIPING DETAIL IN THE SITE
 PLAN. THE STRIPING DETAIL SHALL BE CONSISTENT WITH THE
 REQUIREMENTS OF ZLDR S.94-485, STALL PAINTING DETAIL.
  
 6.) BICYCLE PARKING SHALL BE PROVIDED. PURSUANT TO ZLDR
 S.94-485(Q), ONE (1) BICYCLE PARKING SHALL BE PROVIDED
 FOR EVERY TWENTY (20) AUTOMOBILE PARKING SPACES.
 INCLUDE A RACK DETAIL WITH THE PLAN.
  
 7.) THE FUTURE PARKING MUST EITHER BE PART OF THE
 APPROVAL OR NOT. STAFF SUGGESTS A CONSTRUCTION PHASING
 LINE IF IT IS TO BE PERMITTED SEPARATELY FOR
 CONSTRUCTION.
  
  
 LANDSCAPE PLAN COMMENTS:
  
 1.) SHOW DIMENSIONS OF ALL INTERIOR AND TERMINAL
 ISLANDS IN THE SITE PLAN AND LANDSCAPE PLAN. PURSUANT
 TO ZLDR S.94-443(C)(3)A. AND B., THE LANDSCAPE ISLANDS
 SHALL BE A MINIMUM OF 5 FT. WIDE MEASURED INSIDE THE
 CURB.
  
 2.) A TREE ALTERATION PERMIT IS REQUIRED PRIOR TO THE
 REMOVAL OF ANY TREES ON THE PROPERTY FOR THE
 CONSTRUCTION OF THE NEW PARKING LOT. PLEASE CONTACT RAY
 CARANCI, CITY LANDSCAPE PLANNER, FOR ADDITIONAL
 INFORMATION.
  
 3.) ADDITIONAL COMMENTS TO BE PROVIDED BY THE CITY'S
 LANDSCAPE PLANNER, RAY CARANCI @ (561) 822-1462. ALL
 LANDSCAPE COMMENTS SHALL BE SATISFIED PRIOR TO SITE
 PLAN APPROVAL.
  
  
 INSTRUCTIONS FOR RESUBMITTAL:
  
 * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 * WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF SIX
 (6) PAPER COPIES, ONE (1) REDUCED COPY IN 8.5 INCHES X
 11 INCHES AND ONE (1) SET IN 11 INCHES X 17 INCHES, AND
 AN ELECTRONIC COPY OF ALL PLANS. PLEASE NOTE THAT
 CHANGES ON THE RESUBMITTED PLANS MAY RESULT IN
 ADDITIONAL COMMENTS.
  
 * PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20 PERCENT OF THE ORIGINAL APPLICATION FEE
 ($60).
  
 * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE
 QUESTIONS.