Plan Review Details - Project Z17080018
Plan Review Stops For Project Z17080018
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 09-19-2017 Cont ID  
Sent By rbrown Date 09-19-2017 Time 19:19 Rev Time 0.00
Received By rbrown Date 09-19-2017 Time 19:19 Sent To  
Notes
2017-09-19 19:23:26DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR PERMITTING.
  
 2. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT,
 THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR
 THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT,
 AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE
 FLORIDA BUILDING CODE
  
 3. BUILDING LOCATION RELATIVE TO THE PROPERTY LINE AND
 OTHER STRUCTURES. WHEN SUBMITTED FOR BUILDING PERMIT,
 COMPLIANCE WITH ALL BUILDING SEPARATION, PERCENTAGE OF
 OPENINGS AND OPENING PROTECTIVE REQUIREMENTS OF
 CHAPTERS 6 AND 7 OF THE FLORIDA BUILDING CODE SHALL BE
 VERIFIED.
  
 4. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS,
 GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND
 OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS,
 SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC.
  
 5. EACH SEPARATE BUILDING SHALL HAVE A SEPARATE
 ADDRESS. FOR STREET ADDRESSING, CONTACT MICHAEL ORIO,
 GIS SUPPORT SPECIALIST, AT (561) 494 1080, OR BY EMAIL:
 [email protected]
  
 6. THIS PROJECT WILL BE SUBJECT TO ART IN PUBLIC PLACES
 (AIPP) ASSESSMENT. FOR ADVICE ON THE PROVISION OF
 PUBLIC ARTWORK IN LIEU OF THE AIPP ASSESSMENT, CONTACT
 SYBILLE WELTER, ART IN PUBLIC PLACES COORDINATOR, AT
 (561) 822-1521, OR BY EMAIL: [email protected]
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 3 Status P Date 10-27-2017 Cont ID  
Sent By squinone Date 10-27-2017 Time   Rev Time 0.00
Received By squinone Date 10-27-2017 Time   Sent To  
Notes
2017-10-27 11:32:46CITY OF WEST PALM BEACH
 ENGINEERING SERVICES DEPARTMENT
 DATE: 10/27/2017
 PROJECT: GEORGIAN GARDENS APARTMENT
 ADDRESS: 4330 COMMUNITY DRIVE
 STATUS: PASSED WITH CONDITIONS
  
 IN THE NEXT PHASE, THE FOLLOWING GENERAL COMMENTS MUST
 BE ADDRESSED PRIOR TO ISSUANCE OF CONSTRUCTION
 AUTHORIZATION INCLUDING BUILDING PERMITS AND
 ENGINEERING DEVELOPMENT APPROVAL:
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED FROM THE FOLLOWING WEBSITE LINK:
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 2. PLEASE SUBMIT THE LATEST VERSION OF THE 'AUTO-CALC
 CERTIFIED COST ESTIMATE FORM' FOR SUBMISSION TO CITY OF
 WEST PALM BEACH PUBLIC WORKS DEPARTMENT FOR ADDITIONAL
 WORK PROPOSED. THIS FORM CAN BE DOWNLOADED FROM THE
 FOLLOWING LINK: HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-
 PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 3. PLACEMENT OF ANY PROPOSED METER, BACKFLOW PREVENTER,
 DCDA, CITY'S POINT OF SERVICE, ETC. SHALL BE INSTALLED
 PER THE CITY'S STANDARD DETAILS. WATER METER SHOULD BE
 WITHIN THE RIGHT-OF-WAY OR INSIDE AN 'UTILITY EASEMENT'
 JUST INSIDE THE PROPERTY NEAR THE RIGHT-OF-WAY AND
 ACCESSIBLE;
  
 4. RELOCATE THE WEST FIRE HYDRANT AND FIRE LINE WITHIN
 ADJACENT PROPERTY LIMITS;
  
 5. SUBMIT WITH THE ENGINEERING DEVELOPMENT APPROVAL
 APPLICATION SIGNED & SEALED ENGINEER/MEP WATER AND
 SANITARY SEWER CALCULATION (IN DETAIL I.E. AVERAGE AND
 PEAK WITH PEAKING FACTOR). SUBMIT CALCULATIONS TO
 VALIDATE METER SIZE SELECTION. SHOW THESE CALCULATIONS
 ON THE UTILITY PLAN SHEET AS WELL;
  
 6. SHOW ON THE FINAL PLANS WHERE ARE THE PROPOSED WATER
 AND SANITARY SEWER LINES ARE CONNECTED TO EXISTING
 WATER AND SEWER MAINS;
  
 7. PLEASE INCLUDE THE LATEST VERSION OF THE APPLICABLE
 CITY OF WEST PALM BEACH STANDARD UTILITY DETAILS TO THE
 DETAIL SHEET/S DURING SUBMISSION OF THE FINAL
 ENGINEERING PLANS. CONTACT THE ENGINEERING SERVICES
 DEPARTMENT FOR THE LATEST REVISED DETAILS IN CAD
 FORMAT. CITY'S STANDARD DETAILS (IN PDF FILE FORMAT)
 CAN BE DOWNLOADED FROM THE FOLLOWING SITE: HTTP://WPB.O
 RG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PERMITS-
 APPLICATIONS
  
 8. IN THE FINAL PLANS, MUST PROVIDE UTILITY CONFLICT
 TABLE (BOTTOM AND TOP OF CROSSING PIPES) AT THE
 CONFLICT POINTS OF ALL WATER, STORM AND SANITARY SEWER
 PIPES AS WELL AS OTHER FRANCHISE UTILITIES. EXISTING
 UTILITIES WITHIN THE PROPOSED SANITARY SEWER LATERAL
 ARE TO BE VERIFIED VIA SOFTDIGS, PROVIDE ALL UTILITY
 CROSSING INFORMATION;
  
 9. IN THE FINAL PLANS, SHOW DIRECTION OF FLOW FOR THE
 EXISTING SANITARY SEWER;
  
 10. PAVEMENT RESTORATION FOR OPEN CUT/TRENCH FOR
 UTILITY CONNECTION WORKS WILL NEED TO BE IN ACCORDANCE
 WITH 2016 CITY STANDARD DETAIL GC-9. THE ROAD SHALL BE
 MILLED/RESURFACED FOR FULL LANE WIDTH OF THE TRAVEL
 LANE(S) ENCROACHED BY THE TRENCH AREA, INCLUDING A
 TRANSITION AREA OF 50 FEET ON EACH SIDE OF THE TRENCH.
 PLEASE SHOW ON THE FINAL PLANS THE EXTENT OF THE
 MILLING AND RESURFACING;
  
 11. SHOW ON THE FINAL PLANS SIZE AND MATERIAL OF ALL
 EXISTING UTILITIES ON COMMUNITY DRIVE INCLUDING BUT NOT
 LIMITED TO WATER, SEWER, GAS, UNDERGROUND ELECTRIC
 CONDUITS ETC. PLEASE IDENTIFY THE SOURCE OF THE
 AS-BUILT INFORMATION UTILIZED FOR THE POTABLE WATER,
 SANITARY SEWER, AND STORM SEWER DESIGN;
  
 12. FOR THE FINAL WATER AND SEWER PLANS, INCLUDE A NOTE
 THAT: AS OF DECEMBER 20, 2015 THE CITY OF WEST PALM
 BEACH CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD
 FREE." FOR MORE INFORMATION REFER TO THE LINK BELOW: HT
 TP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLICA
 TIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
  
 13. ALL PROPOSED FIRE DEPARTMENT CONNECTIONS SHALL BE
 WITHIN 100 FEET OF A FIRE HYDRANT AND SHALL BE WITHIN
 AN EASEMENT WITHIN THE PROPERTY;
  
 14. SUBMIT ESTIMATES FOR WATER AND FIRE DEMAND, BOTH
 AVERAGE AND PEAK FLOW WITH PEAKING FACTOR. ALSO SUBMIT
 ESTIMATES OF SANITARY SEWER FLOW FOR THE PROPOSED
 DEVELOPMENT. SHOW PROJECTED DEMANDS ON THE UTILITY PLAN
 SHEET;
  
 15. THE AVAILABLE WATER PRESSURE IN THIS PORTION OF THE
 CITY MAY NOT BE ACCEPTABLE AT ELEVATIONS HIGHER THAN
 THE 2ND FLOOR. WE RECOMMEND A LONG-TERM PRESSURE STUDY
 BE PERFORMED PRIOR TO FINALIZATION OF THE UTILITY
 DESIGN;
  
 16. ON THE LANDSCAPING PLAN, ROOT BARRIERS MAY BE
 REQUIRED WHERE PLANTINGS ARE NEAR UNDERGROUND
 STORMWATER, SANITARY, OR POTABLE WATER LINES;
  
 SOFIA QUINONES-BENEJAM, EI
 PROJECT ENGINEER
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33402
 (MAILING ADDRESS: PO BOX 3366)
 P: 561.494.1108
 C: 561.459.6518
 F: 561.494.1116
 EMAIL: [email protected]
  
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 2 Status F Date 10-06-2017 Cont ID  
Sent By squinone Date 10-06-2017 Time   Rev Time 0.00
Received By squinone Date 10-05-2017 Time   Sent To  
Notes
2017-10-06 14:25:21CITY OF WEST PALM BEACH
 ENGINEERING SERVICES DEPARTMENT
 DATE: 10/06/2017
 PROJECT: GEORGIAN GARDENS APARTMENT
 ADDRESS: 4330 COMMUNITY DRIVE
 STATUS: FAILED
  
 THIS IS AN INITIAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS, AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. FOLLOWING COMMENTS NEED TO BE
 ADDRESSED PRIOR TO SITE PLAN APPROVAL:
  
 1. NOTE NO. 2 SHOULD SAY, 'ALL WATER AND WASTEWATER
 CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE CITY OF
 WEST PALM BEACH ENGINEERING SERVICES DEPARTMENT...'
  
 2. PLACEMENT OF ANY PROPOSED METER, BACKFLOW PREVENTER,
 DCDA, CITY?S POINT OF SERVICE, ETC. SHALL BE INSTALLED
 PER THE CITY?S STANDARD DETAILS. WATER METER SHOULD BE
 WITHIN THE RIGHT-OF-WAY OR INSIDE AN 'UTILITY EASEMENT'
 JUST INSIDE THE PROPERTY NEAR THE RIGHT-OF-WAY AND
 ACCESSIBLE;
  
 3. AS-BUILTS SHOWS ANOTHER 8-INCH SANITARY SEWER PIPE
 WITH A MANHOLE ON THE SOUTH SIDE OF THE PROPERTY
 CONNECTING TO THE ADJACENT PROPERTY'S LIFT STATION.
 NEEDS TO BE VERIFIED AND FOR AS-BUILT INFORMATION
 CONTACT JANICE TARBILL AT [email protected];
  
 4. CHANGE DDCV TO DCDA AND RPZ TO RPPA;
  
 5. CITY DOES NOT ALLOW DIRECTIONAL BORE OF UTILITIES
 WILL NEED TO REFER TO CITY STANDARD DETAIL P-4
 TRENCH-BACKFILL-PAVEMENT RESTORATION;
  
 6. THE CITY WILL NEED A COPY OF THE AGREEMENT WHICH
 ALLOWS GEORGIAN GARDENS TO CONNECT TO THE ADJACENT
 PROPERTY'S FIRE LINE AND DRIVEWAY;
  
 7. SUBMIT ESTIMATES FOR WATER AND FIRE DEMAND, BOTH
 AVERAGE AND PEAK FLOW WITH PEAKING FACTOR. ALSO SUBMIT
 ESTIMATES OF SANITARY SEWER FLOW FOR THE PROPOSED
 DEVELOPMENT. SHOW PROJECTED DEMANDS ON THE UTILITY PLAN
 SHEET;
  
 8. THE AVAILABLE WATER PRESSURE IN THIS PORTION OF THE
 CITY MAY NOT BE ACCEPTABLE AT ELEVATIONS HIGHER THAN
 THE 2ND FLOOR. WE RECOMMEND A LONG-TERM PRESSURE STUDY
 BE PERFORMED PRIOR TO FINALIZATION OF THE UTILITY
 DESIGN;
  
 9. ON THE LANDSCAPING PLAN, ROOT BARRIERS MAY BE
 REQUIRED WHERE PLANTINGS ARE NEAR UNDERGROUND
 STORMWATER, SANITARY, OR POTABLE WATER LINES;
  
 AFTER THE SITE PLAN IS APPROVED, IN THE NEXT PHASE, THE
 FOLLOWING GENERAL COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL:
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED FROM THE FOLLOWING WEBSITE LINK:
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 2. PLEASE SUBMIT THE LATEST VERSION OF THE 'AUTO-CALC
 CERTIFIED COST ESTIMATE FORM' FOR SUBMISSION TO CITY OF
 WEST PALM BEACH PUBLIC WORKS DEPARTMENT FOR ADDITIONAL
 WORK PROPOSED. THIS FORM CAN BE DOWNLOADED FROM THE
 FOLLOWING LINK:
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 3. SUBMIT WITH THE ENGINEERING DEVELOPMENT APPROVAL
 APPLICATION SIGNED & SEALED ENGINEER/MEP WATER AND
 SANITARY SEWER CALCULATION (IN DETAIL I.E. AVERAGE AND
 PEAK WITH PEAKING FACTOR). SUBMIT CALCULATIONS TO
 VALIDATE METER SIZE SELECTION. SHOW THESE CALCULATIONS
 ON THE UTILITY PLAN SHEET AS WELL;
  
 4. SHOW ON THE FINAL PLANS WHERE ARE THE PROPOSED WATER
 AND SANITARY SEWER LINES ARE CONNECTED TO EXISTING
 WATER AND SEWER MAINS;
  
 5. PLEASE INCLUDE THE LATEST VERSION OF THE APPLICABLE
 CITY OF WEST PALM BEACH STANDARD UTILITY DETAILS TO THE
 DETAIL SHEET/S DURING SUBMISSION OF THE FINAL
 ENGINEERING PLANS. CONTACT THE ENGINEERING SERVICES
 DEPARTMENT FOR THE LATEST REVISED DETAILS IN CAD
 FORMAT. CITY?S STANDARD DETAILS (IN PDF FILE FORMAT)
 CAN BE DOWNLOADED FROM THE FOLLOWING SITE: HTTP://WPB.O
 RG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PERMITS-
 APPLICATIONS
  
 6. IN THE FINAL PLANS, MUST PROVIDE UTILITY CONFLICT
 TABLE (BOTTOM AND TOP OF CROSSING PIPES) AT THE
 CONFLICT POINTS OF ALL WATER, STORM AND SANITARY SEWER
 PIPES AS WELL AS OTHER FRANCHISE UTILITIES. EXISTING
 UTILITIES WITHIN THE PROPOSED SANITARY SEWER LATERAL
 ARE TO BE VERIFIED VIA SOFTDIGS, PROVIDE ALL UTILITY
 CROSSING INFORMATION;
  
 7. IN THE FINAL PLANS, SHOW DIRECTION OF FLOW FOR THE
 EXISTING SANITARY SEWER. SHOW INVERT AT CONNECTION
 POINTS AND INCLUDE A PROFILE FOR THE PROPOSED SERVICE
 LATERAL WITH GROUND ELEVATIONS ABOVE THE PIPE;
  
 8. PAVEMENT RESTORATION FOR OPEN CUT/TRENCH FOR UTILITY
 CONNECTION WORKS WILL NEED TO BE IN ACCORDANCE WITH
 2016 CITY STANDARD DETAIL GC-9. THE ROAD SHALL BE
 MILLED/RESURFACED FOR FULL LANE WIDTH OF THE TRAVEL
 LANE(S) ENCROACHED BY THE TRENCH AREA, INCLUDING A
 TRANSITION AREA OF 50 FEET ON EACH SIDE OF THE TRENCH.
 PLEASE SHOW ON THE FINAL PLANS THE EXTENT OF THE
 MILLING AND RESURFACING;
  
 9. SHOW ON THE FINAL PLANS SIZE AND MATERIAL OF ALL
 EXISTING UTILITIES ON COMMUNITY DRIVE INCLUDING BUT NOT
 LIMITED TO WATER, SEWER, GAS, UNDERGROUND ELECTRIC
 CONDUITS ETC. PLEASE IDENTIFY THE SOURCE OF THE
 AS-BUILT INFORMATION UTILIZED FOR THE POTABLE WATER,
 SANITARY SEWER, AND STORM SEWER DESIGN;
  
 10. FOR THE FINAL WATER AND SEWER PLANS, INCLUDE A NOTE
 THAT: AS OF DECEMBER 20, 2015 THE CITY OF WEST PALM
 BEACH CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD
 FREE." FOR MORE INFORMATION REFER TO THE LINK BELOW: HT
 TP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLICA
 TIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
  
 11. ALL PROPOSED FIRE DEPARTMENT CONNECTIONS SHALL BE
 WITHIN 100 FEET OF A FIRE HYDRANT AND SHALL BE WITHIN
 AN EASEMENT WITHIN THE PROPERTY.
  
 SOFIA QUINONES-BENEJAM, EI
 PROJECT ENGINEER
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33402
 (MAILING ADDRESS: PO BOX 3366)
 P: 561.494.1108
 C: 561.459.6518
 F: 561.494.1116
 EMAIL: [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status F Date 09-14-2017 Cont ID  
Sent By squinone Date 09-14-2017 Time   Rev Time 0.00
Received By squinone Date 09-14-2017 Time   Sent To  
Notes
2017-09-14 14:10:51CITY OF WEST PALM BEACH
 ENGINEERING SERVICES DEPARTMENT
 DATE: 09/20/2017
 PROJECT: GEORGIAN GARDENS APARTMENT
 ADDRESS: 4330 COMMUNITY DRIVE
 STATUS: FAILED
  
 THIS IS AN INITIAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS, AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 NO CIVIL ENGINEERING PLANS WERE SUBMITTED IN THE
 INITIAL SITE PLAN PACKAGE INDICATING STORMWATER CONTROL
 AND PLANS FOR WATER AND SEWER SERVICES/CONNECTIONS FOR
 THE PROPOSED DEVELOPMENT. FOLLOWING COMMENTS NEED TO BE
 ADDRESSED PRIOR TO SITE PLAN APPROVAL:
  
 1. PLEASE SHOW ON THE PLANS, IN THE NEXT REVIEW LEVEL,
 HOW WILL THE SITE/BUILDING BE SERVED FOR WATER, SEWER
 AND FIRE PROTECTION. SHOW ALL EXISTING UTILITIES WITHIN
 THE VICINITY OF THE PROPOSED SITE AS WELL AS PROPOSED
 UTILITIES TO SERVE THE DEVELOPMENT (LABEL SIZE AND
 MATERIAL OF ALL PIPES AND CONDUITS ETC.);
  
 2. SUBMIT ESTIMATES FOR WATER AND FIRE DEMAND, BOTH
 AVERAGE AND PEAK FLOW WITH PEAKING FACTOR. ALSO SUBMIT
 ESTIMATES OF SANITARY SEWER FLOW FOR THE PROPOSED
 DEVELOPMENT. SHOW PROJECTED DEMANDS ON THE UTILITY PLAN
 SHEET;
  
 3. THE AVAILABLE WATER PRESSURE IN THIS PORTION OF THE
 CITY MAY NOT BE ACCEPTABLE AT ELEVATIONS HIGHER THAN
 THE 2ND FLOOR. WE RECOMMEND A LONG-TERM PRESSURE STUDY
 BE PERFORMED PRIOR TO FINALIZATION OF THE UTILITY
 DESIGN;
  
 4. ON THE LANDSCAPING PLAN, WHEN SUBMITTED IN THE NEXT
 REVIEW PHASE, SHOW LOCATIONS OF ALL WATER METERS,
 VALVES, CLEAN-OUTS, LIGHT POLES, ETC. ROOT BARRIERS MAY
 BE REQUIRED WHERE PLANTINGS ARE NEAR UNDERGROUND
 STORMWATER, SANITARY, OR POTABLE WATER LINES. ALSO
 CLEARLY INDICATE ALL EXISTING AND PROPOSED EASEMENTS ON
 THE LANDSCAPE PLAN;
  
 5. PLEASE ALSO SHOW ON THE LANDSCAPE PLAN, WHEN
 SUBMITTED IN THE NEXT REVIEW PHASE, SHOW THE SIGHT
 TRIANGLES DIMENSIONS FOR THE ALL VEHICULAR EXITS FROM
 THE SITE. (SECTION 94-305E, CODE OF ORDINANCES);
  
 6. SHOW ON THE SITE PLANS ADA ACCESSIBLE RAMPS ON THE
 SIDEWALK AT EACH ENTRANCE AND EXIT /DRIVEWAY APPROACH;
  
 7. PLEASE SUBMIT ESTIMATES FOR THE SOLID WASTE
 COLLECTION YARDAGE AT THE CONCEPTUAL STAGE. AS PART OF
 THE FINAL DESIGN, THIS SOLID WASTE ESTIMATE WILL NEED
 TO BE VERIFIED TO VALIDATE APPROPRIATE NUMBER AND SIZE
 OF DUMPSTERS/GARBAGE RECEPTACLES. PLEASE SHOW ON THE
 PLAN IF A COMPACTOR IS PROPOSED TO REDUCE THE YARDAGE
 OF WASTE THAT WILL NEED TO BE COLLECTED;
  
 8. FOR SANITATION/GARBAGE COLLECTION CONTACT THE CITY?S
 PUBLIC WORKS DEPARTMENT. FINAL APPROVED SITE PLANS NEED
 TO SHOW PROPOSED SANITATION COLLECTION PLANS AND
 DETAILS; AND WILL NEED APPROVAL FROM PETER BIENIEK,
 PUBLIC WORKS DIRECTOR. IF A SEPARATE ON-SITE LOCATION
 IS CHOSEN FOR STANDARD DUMPSTER, PLEASE INCLUDE THE
 CITY OF WEST PALM BEACH STANDARD DETAIL FOR THE
 DUMPSTER ENCLOSURE ON THE PLANS. MINIMUM DIMENSIONAL
 (E.G. THE GATE WIDTH MUST BE A MINIMUM OF 12.5 FEET)
 REQUIREMENTS FOR THE ENCLOSURE ARE LISTED IN CODE OF
 ORDINANCES, SECTION 94-444(B) OF THE CODE OF
 ORDINANCES. CITY STANDARD DETAIL GC-8 MAY BE DOWNLOADED
 AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS
 /FORMS,-PERMITS-APPLICATIONS
  
 9. PLEASE PROVIDE AN AUTOTURN ANALYSIS DEMONSTRATING
 THE SOLID WASTE COLLECTION VEHICLE CAN ACCESS AND
 MANEUVER WITHIN THE PROPOSED DEVELOPMENT.
  
 AFTER THE SITE PLAN IS APPROVED, IN THE NEXT PHASE, THE
 FOLLOWING GENERAL COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL:
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED FROM THE FOLLOWING WEBSITE LINK:
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 2. PLEASE SUBMIT THE LATEST VERSION OF THE ?AUTO-CALC
 CERTIFIED COST ESTIMATE FORM? FOR SUBMISSION TO CITY OF
 WEST PALM BEACH PUBLIC WORKS DEPARTMENT FOR ADDITIONAL
 WORK PROPOSED. THIS FORM CAN BE DOWNLOADED FROM THE
 FOLLOWING LINK:
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 3. SUBMIT WITH THE ENGINEERING DEVELOPMENT APPROVAL
 APPLICATION SIGNED & SEALED ENGINEER/MEP WATER AND
 SANITARY SEWER CALCULATION (IN DETAIL I.E. AVERAGE AND
 PEAK WITH PEAKING FACTOR). SUBMIT CALCULATIONS TO
 VALIDATE METER SIZE SELECTION. SHOW THESE CALCULATIONS
 ON THE UTILITY PLAN SHEET AS WELL;
  
 4. SHOW ON THE FINAL PLANS WHERE ARE THE PROPOSED WATER
 AND SANITARY SEWER LINES ARE CONNECTED TO EXISTING
 WATER AND SEWER MAINS;
  
 5. SHOW THE NEAREST FIRE HYDRANT TO THIS SITE ON THE
 FINAL UTILITY PLAN. FIRE HYDRANT FLOW TEST DATA FROM
 EXISTING FIRE HYDRANT WILL BE REQUIRED PART OF THE PLAN
 SUBMITTAL. SHOW HYDRANT FLOW TEST DATA RESULT ON THE
 PLANS;
  
 6. FIRE HYDRANT TEST CAN BE REQUESTED AT (561)804-4700
  
 7. PLEASE INCLUDE THE LATEST VERSION OF THE APPLICABLE
 CITY OF WEST PALM BEACH STANDARD UTILITY DETAILS TO THE
 DETAIL SHEET/S DURING SUBMISSION OF THE FINAL
 ENGINEERING PLANS. CONTACT THE ENGINEERING SERVICES
 DEPARTMENT FOR THE LATEST REVISED DETAILS IN CAD
 FORMAT. CITY?S STANDARD DETAILS (IN PDF FILE FORMAT)
 CAN BE DOWNLOADED FROM THE FOLLOWING SITE:
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 8. PLACEMENT OF THE ANY PROPOSED METER, BACKFLOW
 PREVENTER, DCDA ETC. SHALL BE INSTALLED PER THE CITY?S
 STANDARD DETAILS. WATER METER SHOULD BE WITHIN THE
 RIGHT-OF-WAY OR INSIDE AN 'UTILITY EASEMENT' JUST
 INSIDE THE PROPERTY NEAR THE RIGHT-OF-WAY AND
 ACCESSIBLE;
  
 9. IN THE FINAL PLANS, MUST PROVIDE UTILITY CONFLICT
 TABLE (BOTTOM AND TOP OF CROSSING PIPES) AT THE
 CONFLICT POINTS OF ALL WATER, STORM AND SANITARY SEWER
 PIPES AS WELL AS OTHER FRANCHISE UTILITIES. EXISTING
 UTILITIES WITHIN THE PROPOSED SANITARY SEWER LATERAL
 ARE TO BE VERIFIED VIA SOFTDIGS, PROVIDE ALL UTILITY
 CROSSING INFORMATION;
  
 10. IN THE FINAL PLANS, SHOW DIRECTION OF FLOW FOR THE
 EXISTING SANITARY SEWER. SHOW INVERT AT CONNECTION
 POINTS AND INCLUDE A PROFILE FOR THE PROPOSED SERVICE
 LATERAL WITH GROUND ELEVATIONS ABOVE THE PIPE;
  
 11. PAVEMENT RESTORATION FOR OPEN CUT/TRENCH FOR
 UTILITY CONNECTION WORKS WILL NEED TO BE IN ACCORDANCE
 WITH 2016 CITY STANDARD DETAIL GC-9. THE ROAD SHALL BE
 MILLED/RESURFACED FOR FULL LANE WIDTH OF THE TRAVEL
 LANE(S) ENCROACHED BY THE TRENCH AREA, INCLUDING A
 TRANSITION AREA OF 50 FEET ON EACH SIDE OF THE TRENCH.
 PLEASE SHOW ON THE FINAL PLANS THE EXTENT OF THE
 MILLING AND RESURFACING;
  
 12. SHOW ON THE FINAL PLANS SIZE AND MATERIAL OF ALL
 EXISTING UTILITIES ON COMMUNITY DRIVE INCLUDING BUT NOT
 LIMITED TO WATER, SEWER, GAS, UNDERGROUND ELECTRIC
 CONDUITS ETC. PLEASE IDENTIFY THE SOURCE OF THE
 AS-BUILT INFORMATION UTILIZED FOR THE POTABLE WATER,
 SANITARY SEWER, AND STORM SEWER DESIGN;
  
 13. FOR THE FINAL WATER AND SEWER PLANS, INCLUDE A NOTE
 THAT: AS OF DECEMBER 20, 2015 THE CITY OF WEST PALM
 BEACH CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD
 FREE." FOR MORE INFORMATION REFER TO THE LINK BELOW: HT
 TP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLICA
 TIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
  
 14. ALL PROPOSED FIRE DEPARTMENT CONNECTIONS SHALL BE
 WITHIN 100 FEET OF A FIRE HYDRANT AND SHALL BE WITHIN
 AN EASEMENT WITHIN THE PROPERTY.
  
 SOFIA QUINONES-BENEJAM, EI
 PROJECT ENGINEER
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33402
 (MAILING ADDRESS: PO BOX 3366)
 P: 561.494.1108
 C: 561.459.6518
 F: 561.494.1116
 EMAIL: [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 05-08-2018 Cont ID  
Sent By pleduc Date 05-08-2018 Time   Rev Time 0.00
Received By pleduc Date 05-08-2018 Time 16:41 Sent To  
Notes
2018-05-08 16:42:553RD REVIEW RESPONSE
  
 AFTER A REVIEW OF THE PPRC RESPONSE MEMO FROM LINDA
 LOUIE, PLANNER, AND THE ATTACHMENT DATED MAY 2, 2018,
 THE PREVIOUSLY SUBMITTED FIRE PREVENTION BUREAU
 COMMENTS APPEAR TO HAVE BEEN ADDRESSED.
  
 HOWEVER, THE BUREAU'S APPROVAL OF THIS SUBMITTED
 PROJECT DOES NOT CONSTITUTE ITS FINAL REVIEW OR
 APPROVAL.
  
 THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT
 THE APPROPRIATE TIME AND IN ACCORDANCE WITH THE
 REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
  
 PETER LEDUC
 FIRE MARSHAL
 WEST PALM BEACH FIRE RESCUE
 561-804-4709
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 10-05-2017 Cont ID  
Sent By pleduc Date 10-05-2017 Time   Rev Time 0.00
Received By pleduc Date 10-05-2017 Time 16:21 Sent To  
Notes
2017-10-05 16:32:062ND REVIEW RESPONSE
  
 AFTER A REVIEW OF THE PPRC RESPONSE LETTER DATED
 OCTOBER 4, 2017, FROM GUNSTER, YOAKLEY & STEWARD, P.A.,
 TO LINDA LOUIE, PLANNER, THE PREVIOUSLY SUBMITTED FIRE
 PREVENTION BUREAU COMMENTS HAVE BEEN ADDRESSED.
  
 THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT DOES
 NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL.
  
 THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT
 THE APPROPRIATE TIME AND IN ACCORDANCE WITH THE
 REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
  
  
 PETER LEDUC
 FIRE MARSHAL
 WEST PALM BEACH FIRE RESCUE
 561-804-4709
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 09-13-2017 Cont ID  
Sent By scaldero Date 09-13-2017 Time 14:13 Rev Time 0.00
Received By scaldero Date 09-13-2017 Time 14:07 Sent To  
Notes
2017-09-13 14:13:06THE FOLLOWING COMMENTS WERE SUBMITTED BY SUE ELLEN
 CALDERON, ASST. FIRE MARSHAL, BUREAU OF FIRE
 PREVENTION, WEST PALM BEACH FIRE RESCUE.
  
 THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE
 DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE.
 ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS
 ARE SUBMITTED FOR PERMIT.
  
 THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE
 PROPOSED PROJECT.
  
 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY
 WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE
 PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A
 PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED
 TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN
 STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY
 MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER
 PROTECTION.
  
 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY
 IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING
 ALL CONSTRUCTION ACTIVITIES.
  
 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM
 ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION.
 ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND
 AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT
 WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS.
  
 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE
 REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE
 ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS.
  
 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH
 THE 5TH EDITION OF THE FLORIDA FIRE PREVENTION CODE,
 INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES.
  
 6. FOR PLAN REVIEW SUBMITTAL, PLEASE ENSURE THAT A FIRE
 LOAD CALCULATION IS INCLUDED AND THAT ADEQUATE WATER
 SUPPLY IS EXISTING OR WILL BE PROVIDED.
  
 7. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS
 DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED
 ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF
 FIRE PREVENTION.
  
 8. ALL NEW FIRE HYDRANTS AND FDC?S PLANNED FOR THIS
 DEVELOPMENT SHALL BE CLOSELY COORDINATED WITH THE
 BUREAU OF FIRE PREVENTION. PROPOSED FIRE HYDRANTS AND
 FDC?S SHOULD BE LOCATED ON THE SAME SIDE OF THE STREET
 OR ACCESS ROADWAY TO ALLOW FREE ACCESS FOR OTHER
 ARRIVING EMERGENCY VEHICLES.
  
 9. PROVIDE FOR A FIRE SPRINKLER AND/OR FIRE ALARM PER
 THE APPLICABLE OCCUPANCY CODE. FOR ANY LIFE SAFETY
 ENGINEERED SYSTEM, I.E FIRE SPRINKLER AND FIRE ALARM,
 ENSURE THEY COMPLY WITH THE REQUIREMENTS OF FS 61G AND
 SUBMITTED WITH THE MASTER PLAN.
  
 10. PER FLORIDA ADMINISTRATIVE CODE SECTION
 61G15-32.004, FIRE PROTECTION ENGINEERING DOCUMENTS
 SHALL INCLUDE THE POINT OF SERVICE FOR THE WATER
 SUPPLY, A LIST OF APPLICABLE NFPA STANDARDS APPLICABLE
 TO THE PROJECT, CLASSIFICATION OF HAZARD OCCUPANCY FOR
 EACH ROOM OR AREA, SUPPRESSION SYSTEM TYPE, DESIGN
 DENSITIES, WATER SUPPLY DATA (FIRE PUMP DATA, HYDRANT
 FLOW TEST DATA) AND ANY PERFORMANCE BASED INFORMATION
 SUCH AS PRE-ENGINEERED SYSTEMS.
  
 11. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL
 BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL
 DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS,
 EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A
 PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE
 SAFETY FEATURES AND EQUIPMENT.
  
 12. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT
 DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL.
  
 13. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING
 PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH
 THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
  
  
 SUE ELLEN CALDERON
 ASST. FIRE MARSHAL
 [email protected]
  
  

Review Stop L LANDSCAPING
Rev No 4 Status P Date 06-14-2018 Cont ID  
Sent By rcaranci Date 06-14-2018 Time 15:21 Rev Time 0.00
Received By rcaranci Date 06-14-2018 Time 15:20 Sent To  
Notes
2018-06-14 15:21:24FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462
 PROJECT: GEORGIAN GARDENS Z17080018
 JUNE 14, 2018
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
 1. COMMENTS 1 THROUGH 9 PREVIOUSLY SATISFIED.
 2. SATISFIED.
 3. SATISFIED.
 4. SATISFIED.
 5. SATISFIED.
 6. SATISFIED.
 7. SATISFIED.
 8. SATISFIED.
 9. SATISFIED.
 ADDITIONAL COMMENT 5/21/18:
 10. SATISFIED. PLEASE RESTORE THE SHADE TREES AS
 REQUIRED IN THE PARKING AREA LANDSCAPE ISLANDS.
 LIGUSTRUM DOES NOT QUALIFY AS A SHADE TREE PER CITY
 CODE. UTILITY LINES ARE SPACED FAR ENOUGH AWAY TO ALLOW
 ROOT BARRIER PLACEMENT TO BE SHOWN ON THE LANDSCAPE
 PLAN.
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop L LANDSCAPING
Rev No 3 Status F Date 05-21-2018 Cont ID  
Sent By rcaranci Date 05-21-2018 Time 11:01 Rev Time 0.00
Received By rcaranci Date 05-21-2018 Time 11:01 Sent To  
Notes
2018-05-21 11:01:53FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462
 MEMO TO FILE
 PROJECT: GEORGIAN GARDENS Z17080018
 MAY 21, 2018
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
 1. COMMENTS 1 THROUGH 9 PREVIOUSLY SATISFIED.
 2. SATISFIED.
 3. SATISFIED.
 4. SATISFIED.
 5. SATISFIED.
 6. SATISFIED.
 7. SATISFIED.
 8. SATISFIED.
 9. SATISFIED.
 ADDITIONAL COMMENT 5/21/18:
 10. PLEASE RESTORE THE SHADE TREES AS REQUIRED IN THE
 PARKING AREA LANDSCAPE ISLANDS. LIGUSTRUM DOES NOT
 QUALIFY AS A SHADE TREE PER CITY CODE. UTILITY LINES
 ARE SPACED FAR ENOUGH AWAY TO ALLOW ROOT BARRIER
 PLACEMENT TO BE SHOWN ON THE LANDSCAPE PLAN.
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop L LANDSCAPING
Rev No 2 Status P Date 10-27-2017 Cont ID  
Sent By rcaranci Date 10-27-2017 Time 15:09 Rev Time 0.00
Received By rcaranci Date 10-27-2017 Time 15:09 Sent To  
Notes
2017-10-27 15:09:19FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462
 MEMO TO FILE
 PROJECT: GEORGIAN GARDENS Z17080018
 OCTOBER 27, 2017
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 1. SATISFIED. PLEASE PROVIDE A TREE SURVEY AND A TREE
 DISPOSITION LIST IDENTIFYING SPECIES AND TREE CANOPY
 DIAMETER OF TREES AND PALMS, AND INDICATE WHETHER THEY
 WILL REMAIN, BE RELOCATED OR REMOVED. ALL CALCULATIONS
 AND DATA NEEDS TO BE UPDATED WHEN THE LOCATIONS AND
 SPECIES OF TREES TO REMAIN ARE DETERMINED.
  
 2. SATISFIED. PLEASE SHOW THE BUFFER REQUIREMENTS OF
 SECTION 94-443(D)(1) ARE MET, WITH CALCULATIONS SHOWN
 ON THE PLAN.
  
 3. SATISFIED. PLEASE SHOW THE REQUIREMENTS OF ONE
 ADDITIONAL TREE PER UNIT IS PROVIDED PER SECTION
 94-443(D)(2)A.
  
 4. SATISFIED. PLEASE SHOW THE REQUIRED AND PROVIDED
 PERIMETER LANDSCAPE FOR THE BUILDING PERIMETER PER
 SECTION 94-443(D)(2)B.
  
 5. SATISFIED. PLEASE SHOW LOCATIONS OF WATER AND SEWER
 LINES AND FPL TRANSFORMERS ON THE LANDSCAPE PLAN.
  
 6. SATISFIED. PLEASE SHOW LOCATIONS OF ROOT BARRIERS TO
 PROTECT INFRASTRUCTURE AND TREES FROM CONFLICTS. THIS
 INCLUDES WATER, SEWER, DRAINAGE, SIDEWALKS AND CURBS,
 AND ANY FIELD STRUCTURES THAT COULD BE IMPACTED BY TREE
 ROOTS.
  
 7. SATISFIED. PLEASE PROVIDE SCREENING FOR ALL GROUND
 MOUNTED EQUIPMENT AND UTILITIES. WATER BACKFLOW VALVES
 AND FPL TRANSFORMERS MUST HAVE SCREENING HEDGES.
  
 8. SATISFIED. PARKING LOT LANDSCAPE AREAS MUST MEET THE
 REQUIREMENTS OF SECTION 94-443(C)(3) AND (4). PLEASE
 SHOW ALL CALCULATIONS AND PROVIDE A DIAGRAM SHOWING THE
 AREAS COUNTED TOWARD THIS REQUIREMENT.
  
 9. SATISFIED. PLEASE PROVIDE THE LOCATIONS OF LIGHTING
 ON THE LANDSCAPE PLAN TO PREVENT CONFLICTS WITH TREES.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop L LANDSCAPING
Rev No 1 Status F Date 09-06-2017 Cont ID  
Sent By rcaranci Date 09-06-2017 Time 16:42 Rev Time 0.00
Received By rcaranci Date 09-06-2017 Time 16:41 Sent To  
Notes
2017-09-06 16:42:24PROJECT: GEORGIAN GARDENS Z17080018
 SEPTEMBER 6, 2017
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
  
 1. PLEASE PROVIDE A TREE SURVEY AND A TREE DISPOSITION
 LIST IDENTIFYING SPECIES AND TREE CANOPY DIAMETER OF
 TREES AND PALMS, AND INDICATE WHETHER THEY WILL REMAIN,
 BE RELOCATED OR REMOVED. ALL CALCULATIONS AND DATA
 NEEDS TO BE UPDATED WHEN THE LOCATIONS AND SPECIES OF
 TREES TO REMAIN ARE DETERMINED.
  
 2. PLEASE SHOW THE BUFFER REQUIREMENTS OF SECTION
 94-444(D)(1) ARE MET, WITH CALCULATIONS SHOWN ON THE
 PLAN.
  
 3. PLEASE SHOW THE REQUIREMENTS OF ONE ADDITIONAL TREE
 PER UNIT IS PROVIDED PER SECTION 94-444(D)(2)A.
  
 4. PLEASE SHOW THE REQUIRED AND PROVIDED PERIMETER
 LANDSCAPE FOR THE BUILDING PERIMETER PER SECTION
 94-444(D)(2)B.
  
 5. PLEASE SHOW LOCATIONS OF WATER AND SEWER LINES AND
 FPL TRANSFORMERS ON THE LANDSCAPE PLAN.
  
 6. PLEASE SHOW LOCATIONS OF ROOT BARRIERS TO PROTECT
 INFRASTRUCTURE AND TREES FROM CONFLICTS. THIS INCLUDES
 WATER, SEWER, DRAINAGE, SIDEWALKS AND CURBS, AND ANY
 FIELD STRUCTURES THAT COULD BE IMPACTED BY TREE ROOTS.
  
 7. PLEASE PROVIDE SCREENING FOR ALL GROUND MOUNTED
 EQUIPMENT AND UTILITIES. WATER BACKFLOW VALVES AND FPL
 TRANSFORMERS MUST HAVE SCREENING HEDGES.
  
 8. PARKING LOT LANDSCAPE AREAS MUST MEET THE
 REQUIREMENTS OF SECTION 94-443(C)(3) AND (4). PLEASE
 SHOW ALL CALCULATIONS AND PROVIDE A DIAGRAM SHOWING THE
 AREAS COUNTED TOWARD THIS REQUIREMENT.
  
 9. PLEASE PROVIDE THE LOCATIONS OF LIGHTING ON THE
 LANDSCAPE PLAN TO PREVENT CONFLICTS WITH TREES.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop PARK PARKING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop POLICE POLICE
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PW PUBLIC WORKS
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop STORM STORMWATER
Rev No 5 Status P Date 06-18-2018 Cont ID  
Sent By tward Date 06-18-2018 Time 10:40 Rev Time 0.00
Received By tward Date 06-18-2018 Time 10:40 Sent To  
Notes
***NONE***

Review Stop STORM STORMWATER
Rev No 4 Status F Date 05-10-2018 Cont ID  
Sent By tward Date 05-10-2018 Time 17:35 Rev Time 0.00
Received By tward Date 05-10-2018 Time 18:03 Sent To  
Notes
2018-05-10 18:03:24THE FOILLOWING COMMENTS ARE FROM THE REVIEW OF THE MAY
 7, 2018 SUBMITTAL PACKAGE.
  
 1. THE LANDSCAPE PLANS ARE NOT SHOWING THE LATEST
 PROPOSED UTILITIES SHOWN ON THE CIVIL PLANS. INCLUDE
 THE ROOF DRAINAGE PIPING ON THE PLUMBING SITE PLAN .
  
 2. LABEL VERTICAL DATUM ON DRAINAGE PLAN AND WATER AND
 SEWER PLANS. PROVIDE CONVERSION EQUATION TO NGVD 1929.
  
 3. IDENTIFY WHICH DRAINAGE STRUCTURE(S) WILL BE CONTROL
 STRUCTURES FOR RESTRICTING RUNOFF DISCHARGE FROM THE
 SITE.
  
 4. DDA NEEDED AFTER THE 8" GATE VALVE ON THE WATER MAIN
 AT THE NORTHEAST CORNER OF THE PROPERTY. THE WATER MAIN
 AFTER THE VALVE WILL BE A PRIVATE WATER MAIN.
  
 TRACY WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  
  

Review Stop STORM STORMWATER
Rev No 3 Status P Date 12-13-2017 Cont ID  
Sent By tward Date 12-13-2017 Time 14:47 Rev Time 0.00
Received By tward Date 12-13-2017 Time 15:00 Sent To  
Notes
2017-12-13 14:59:49THE COOMENTS BELOW ARE FROM THE SET OF PLANS
 DISTRIBUTED THE WEEK OF 12/11/17:
  
 1. THE SITE PLAN STILL SHOWS RETENTION POND WITH BLUE
 COLOR FOR WATER. THE CONCEPTUAL ENGINEERING PLAN SHOWS
 THE FEATURE AS A DRY DETENTION AREA. THE SITE PLAN WILL
 BE CHANGED TO LABEL THE AREA AS DRY DETENTION AND THE
 BLUE COLOR CHANGED.
  
 2. THE CONCEPTUAL ENGINEERING PLAN IS NOT SHOWING THE
 LIMITS OF THE:
 A. UTILITY EASEMENT / RIGHT OF WAY EASEMENT ALONG THE
 NORTH PROPERTY LINE
 B. RIGHT OF WAY EASEMENT ALONG THE EAST PROPERTY LINE.
  
 THE ENGINEER HAS EMAILED TO SAY THE CONCEPTUAL
 ENGINEERING PLAN WILL BE RESUBMITTED WITH THE EASEMENT
 LINES SHOWN.
  
 3. A FIRE HYDRANT IS SHOWN NEAR THE NORTHEAST CORNER OF
 THE PROPERTY. THE FIRE MARSHALL HAS REQUESTED THE FIRE
 DEPARTMENT CONNECTION BE MOVED TO BE NEAR THE FIRE
 HYDRANT NEAR THE ENTRANCE ROAD AT THE SOUTHWEST CORNER
 OF THE SITE. THIS CHANGE IN FDC LOCATION WILL BE MADE
 DURING ENGINEERING PERMIT APPLICATION SUBMITTAL. THE FH
 AT THE NORTHEAST CORNER OF THE SITE WILL NOT BE NEEDED.
 THIS FH WILL NOT BE ON THE PLANS FOR ENGINEERING PERMIT
 APPLICATION.
  
 4. THE CONCEPTUAL ENGINEERING PLAN SHOWS THE EXISTING
 SANITARY SEWER GOING OUTSIDE OF THE 12' EASEMENT ALONG
 THE SOUTH PROPERTY LINE. THE SEWER SYSTEM ACTUALLY
 TURNS SOUTH BEFORE THE END OF THE EASEMENT AND CONNECTS
 TO THE OFFSITE SEWER MANHOLE SHOWN ON THE DRAWING. THIS
 CAN BE CORRECTED ON THE PLANS SUBMITTED FOR ENGINEERING
 PERMIT.
  
 5. THE CONCEPTUAL ENGINEERING PLAN SHOWS A UTILITY
 EASEMENT AROUND THE PROPOSED FIRE HYDRANT AND WATER
 METER NEAR THE NORTHEAST CORNER OF THE PROPERTY. IF THE
 EXISTING 10-UTILITY EASEMENT ALONG THE NORTH PROPERTY
 LINE IS REMAINING THEN ANOTHER UTILITY EASEMENT IS NOT
 NEEDED. THE FIRE HYDRANT AND WATER METER APPEAR TO BE
 WITHIN THE EXISTING UTILITY EASEMENT. THE ENGINEERING
 EMAILED TO SAY THE REVISED ENGINEERING PLAN DRAWING
 WILL NOT SHOW THE PROPOSED UTILITY EASEMENT AROUND THE
 WATER METER AND FIRE HYDRANT.
  
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120
  

Review Stop STORM STORMWATER
Rev No 2 Status F Date 10-16-2017 Cont ID  
Sent By tward Date 10-16-2017 Time 16:31 Rev Time 0.00
Received By tward Date 10-16-2017 Time 16:55 Sent To  
Notes
2017-10-16 16:54:46THE FOLLOWING COMMENTS ARE BASED UPON THE REVIEW OF THE
 OCTOBER 5, 2017 SUBMITTAL PACKAGE.
  
 1. LABEL THE VERTICAL DATUM ON THE CONCEPTUAL PAVING,
 DRAINAGE, WATER AND WASTEWATER PLAN. IF DIFFERENT THAN
 CITY'S VERTICAL DATUM, NGVD1929, THEN PROVIDE
 CONVERSION FACTOR TO OBTAIN NGVD 1929.
  
 2. SHOW ALL UTILITIES ON THE LANDSCAPE PLANS. THE
 CONCEPTUAL ENGINEERING PLAN SHOWS STORM WATER PIPES
 INTO THE DRY DETENTION AREA THAT ARE NOT SHOWN ON THE
 LANDSCAPE PLANS.
  
 3. CONCEPTUAL ENGINEERING PLAN LABELS THE OPEN FEATURE
 IN THE SOUTHWEST CORNER OF THE SITE AS A PROPOSED DRY
 DETENTION AREA. THE ARCHITECTURAL PLANS LABEL THE AREA
 AS RETENTION POND. POND INDICATES PERMANENT WATERBODY
 WHICH IS NOT THE SAME AS DRY DETENTION AREA. RETENTION
 AND DETENTION ARE NOT THE SAME EITHER.
  
 4. SFWMD HAS MINIMUM DIMENSIONAL REQUIREMENTS FOR WET
 PONDS USED FOR WATER QUALITY TREATMENT.
  
 5. SFWMD PERMIT TO BE SUBMITTED WITH ENGINEERING PERMIT
 APPLICATION.
  
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]

Review Stop STORM STORMWATER
Rev No 1 Status F Date 09-07-2017 Cont ID  
Sent By tward Date 09-07-2017 Time 13:17 Rev Time 0.00
Received By tward Date 09-07-2017 Time 13:20 Sent To  
Notes
2017-09-07 13:20:23THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT HTTP://
 WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PER
 MITS-APPLICATIONS
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. NEW FEMA FIRM MAPS AND TWO FEET OF FREEBOARD ABOVE
 BASE FLOOD ELEVATION FOR STRUCTURES IN SPECIAL FLOOD
 HAZARD AREAS WILL BE EFFECTIVE ON OCTOBER 5, 2017 IF
 RESOLUTION PASSES AT SECOND READING BEFORE CITY
 COMMISSION. THE MAPS ARE AVAILABLE AT
 HTTP://MAPS.CO.PALM-BEACH.FL.US/GIS/FLOODZONES.ASPX?.
  
 2. NO ENGINEERING PLANS WERE PROVIDED.
  
 3. DEVELOPMENT IS LOCATED IN THE C-17 DRAINAGE BASIN.
  
 4. SHOW UTILITIES ON THE LANDSCAPE PLANS AND LIGHTING
 PLANS.
  
 5. CITY?S VERTICAL DATUM IS NATIONAL GEODETIC VERTICAL
 DATUM OF 1929 (NGVD29). THE VERTICAL DATUM ON THE
 ALTA/NSPS LAND TITLE BOUNDARY SURVEY IS NORTH AMERICAN
 VERTICAL DATUM OF 1988 (NAVD88). PROVIDE A CONVERSION
 FACTOR BETWEEN NAVD88 AND NGVD29 ON THE SURVEY.
  
 6. PROVIDE ?NORTH? ARROW ON SHEET A0.02.
  
 7. IT APPEARS THE DRIVEWAY TO THE PROPOSED DEVELOPMENT
 IS ON A SEPARATE PARCEL OF LAND THAT IS OWNED BY
 OTHERS. IS THERE AN ACCESS EASEMENT/AGREEMENT TO USE
 THE DRIVEWAY.
  
 8. THE SFWMD ERP PERMIT FOUND ON SFWMD?S WEBSITE
 DOESN?T APPEAR TO MATCH WHAT WAS BUILT.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE
 ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 2. PROVIDE A COPY OF THE SFWMD ERP MODIFICATION FOR
 THIS PROPOSED DEVELOPMENT.
  
 3. PROVIDE A COPY OF THE NPBCID PERMIT MODIFICATION FOR
 THIS DEVELOPMENT.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  

Review Stop SURVEY SURVEYING
Rev No 3 Status P Date 10-30-2017 Cont ID  
Sent By vnoel Date 10-30-2017 Time 07:37 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
2017-10-30 07:39:42PASSED WITH CONDITION OF EITHER AGREEMENT FOR
 CONNECTION TO PRIVATE LIFT STATION OR NEW ON-SITE LIFT
 STATION AND CONNECTION TO CITY SANITARY.

Review Stop SURVEY SURVEYING
Rev No 2 Status F Date 10-16-2017 Cont ID  
Sent By vnoel Date 10-16-2017 Time 07:35 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
2017-10-16 07:44:021. THIS PROPERTY FALLS WITHIN THE CITY'S SERVICE AREA
 FOR WATER AND SEWER. THE ABILITY TO CONNECT TO THE
 COUNTY'S FACILITIES IS NOT AN OPTION. PLEASE REVIEW AND
 REVISE ACCORDINGLY.

Review Stop SURVEY SURVEYING
Rev No 1 Status F Date 09-15-2017 Cont ID  
Sent By vnoel Date 09-15-2017 Time 08:26 Rev Time  
Received By vnoel Date   Time   Sent To  
Notes
2017-09-15 08:39:471. NO ENGINEERING PLANS PROVIDED. NEED TO REVIEW THE
 ADJOINING PRIVATE LIFT STATION.
 2. NEED DUMPSTER LOCATION APPROVED BY PETER BIENIEK,
 PUBLIC WORKS DIRECTOR.
 3. NEED CONVERSION FROM NAVD 88 TO NGVD 29.
 4. NEED COUNTY APPROVAL FOR LANDSCAPING IN UTILITY
 EASEMENTS.
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 3 Status P Date   Cont ID  
Sent By   Date 05-14-2018 Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
2018-05-14 17:04:46PASSED WITH CONDITION. A PALM BEACH COUNTY RIGHT OF WAY
 PERMIT IS REQUIRED FOR MODIFICATION TO THE ENTRANCE ON
 COMMUNITY DRIVE.
  
 ERIK D. FERGUSON, PE
 CITY TRANSPORTATION ENGINEER

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 2 Status P Date   Cont ID  
Sent By   Date 10-12-2017 Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
2017-10-12 16:10:45PASSED WITH CONDITIONS:
 1) APPLICANT WILL WORK WITH OWNER OF ADJACENT PROPERTY
 TO MODIFY SHARED ACCESS ENTRACE ON COMMUNITY DRIVE FOR
 A.D.A. COMPLIANCE. NOTE THAT THE MODIFICATIONS TO THE
 ENTRANCE WILL MOST LIKELY REQUIRE A PALM BEACH COUNTY
 PERMIT AS COMMUNITY DRIVE IS A COUNTY ROADWAY.
  
 ERIK D. FERGUSON, P.E.
 SENIOR PROJECT ENGINEER
 561-494-1092
 [email protected]

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status F Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
2017-09-18 09:40:48THIS REVIEW IS PRELIMINARY AS DETAILED ENGINEERING
 PLANS WERE NOT PROVIED. THE COMMENTS ARE AS FOLLOWS:
 1) PROVIDE PALM BEACH COUNTY TRAFFIC CONCURRENC LETTER.
 2) THE EXISTING SIDEWALK AT THE DRIVEWAY ENTRANCE DOES
 NOT APPEAR TO BE A.D.A. COMPLIANT. PROVIDE DRIVEWAY
 PROFILE AND CURB RAMP DETAILS WITH RESUBMITTAL.
  
 ERIK D. FERGUSON, P.E.
 SENIOR PROJECT ENGINEER
 561-494-1092
 [email protected]

Review Stop Z ZONING
Rev No 5 Status P Date 06-20-2018 Cont ID  
Sent By llouie Date 06-20-2018 Time   Rev Time 0.00
Received By llouie Date 06-20-2018 Time   Sent To  
Notes
2018-06-20 15:25:12APPROVED WITH THE FOLLOWING CONDITIONS:
  
 1.) THE DEVELOPER SHALL WORK WITH THE OWNER OF THE
 ADJACENT PROPERTY TO MODIFY THE SHARED ACCESS ENTRANCE
 ON COMMUNITY DRIVE FOR A.D.A. COMPLIANCE. MODIFICATION
 TO THE ENTRANCE WILL REQUIRE A RIGHT-OF-WAY PERMIT FROM
 PALM BEACH COUNTY, AS COMMUNITY DRIVE IS A COUNTY
 ROADWAY. THE DEVELOPER SHALL BE REQUIRED TO OBTAIN THE
 COUNTY RIGHT-OF-WAY PERMIT PRIOR TO THE ISSUANCE OF A
 BUILDING PERMIT.
  
 2.) PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT - PLANNING DIVISION.
  
 3.) PRIOR TO THE SUBMISSION OF A BUILDING PERMIT, AN
 ENGINEERING DEVELOPMENT APPROVAL APPLICATION SHALL BE
 REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  

Review Stop Z ZONING
Rev No 4 Status F Date 06-11-2018 Cont ID  
Sent By llouie Date 06-11-2018 Time   Rev Time 0.00
Received By llouie Date 06-11-2018 Time   Sent To  
Notes
2018-06-11 14:04:17BELOW ARE OUTSTANDING SITE PLAN COMMENTS (PLANS REVISED
 6/1/18 AND SUBMITTED TO THE CITY ON 6/5/18 IN
 ASSOCIATION WITH THE REQUEST FOR THE MAJOR PLANNED
 DEVELOPMENT (PD) AMENDMENT, APPROVED BY THE CITY
 COMMISSION ON 1/29/18 (ORDINANCE NO. 4757-17).
  
 1.) PLEASE ADDRESS THE FOLLOWING IN THE PROJECT
 INFORMATION TABULAR ON SHEET A0.03: THE BUILDING HEIGHT
 INFORMATION DOES NOT MATCH THE HEIGHT PROVIDED IN THE
 BUILDING ELEVATIONS (SHEETS A2.01 AND A2.02). THE
 HEIGHT SHOULD READ 53'-0" TO THE TOP, AS SPECIFIED IN
 THE ELEVATION DRAWINGS. [5/10/18 REPEAT COMMENT]
  
 2.) ADD NOTE TO SEE DETAIL ON SHEET A0.05 AT THE
 LOCATION OF THE MONUMENT SIGN ON SHEET A1.01 (SITE
 PLAN). [5/10/18 REPEAT COMMENT]
  

Review Stop Z ZONING
Rev No 3 Status F Date 05-10-2018 Cont ID  
Sent By llouie Date 05-10-2018 Time   Rev Time 0.00
Received By llouie Date 05-10-2018 Time   Sent To  
Notes
2018-05-10 12:27:54BELOW ARE OUTSTANDING SITE PLAN COMMENTS (PLANS REVISED
 AND SUBMITTED TO CITY ON 5/3/18) IN ASSOCIATION WITH
 THE REQUEST FOR THE MAJOR PLANNED DEVELOPMENT (PD)
 AMENDMENT, APPROVED BY THE CITY COMMISSION ON 1/29/18
 (ORDINANCE NO. 4757-17).
  
 1.) PLEASE MAKE THE FOLLOWING CORRECTIONS TO THE COVER
 SHEET: LIFE SAFETY PLAN-GROUND LEVEL IS SHEET A1.06
 (NOT A1.07); LIFE SAFETY PLAN-TYPICAL LEVEL IS SHEET
 A1.07 (NOT A1.05); LIFE SAFETY PLAN-ROOF LEVEL IS SHEET
 A1.08 (NOT A1.05); TREE DISPOSITION PLAN IS SHEETS TD-1
 AND TD-2 (NOT TDP-1 AND TDP-2); PLUMBING SITE PLAN IS
 SHEET P-100 (NOT MECHANICAL SITE PLAN);.
  
 2.) SHEET A0.02 IS INCONSISTENT WITH THE LATEST CHANGES
 MADE TO THE SITE PLAN (I.E. LOCATION OF THE LIGHT
 FIXTURES, TREES IN THE MIDDLE OF THE PARKING AREA
 PEDESTRIAN CROSSWALK, PAVED SURFACE IS SHADED GREEN
 WITHIN THE CROSSWALK, ETC.). PLEASE ADDRESS.
  
 3.) PLEASE ADDRESS THE FOLLOWING IN THE PROJECT
 INFORMATION TABULAR ON SHEET A0.03: THE BUILDING
 HEIGHT INFORMATION DOES NOT MATCH THE HEIGHT PROVIDED
 IN THE BUILDING ELEVATIONS (SHEETS A2.01 AND A2.02);
 SIDE SETBACK (WEST) IS 43'-9" (NOT 43'-9""); PLEASE
 MODIFY THE FOOTNOTE REGARDING THE 40% REDUCTION TO
 REFERENCE THE ZONING CODE SECTION OR ORDINANCE NO.
 4758-17 (THE CITY-INITIATED TEXT AMENDMENT HAS ALREADY
 BEEN ADOPTED).
  
 4.) THE BICYCLE RACK DETAIL ON SHEET A0.04 HAS BEEN
 MODIFIED SO THAT IT IS NO LONGER CONSISTENT WITH THE
 CITY'S BICYCLE PARKING GUIDELINES. PLEASE ADDRESS AS
 THE WAVE RACK IS NOT PERMITTED IN THE CITY.
  
 5.) PLEASE CORRECT THE PROPERTY NAME AND PROPERTY
 ADDRESS FOR DETAIL 0.6 ON SHEET A0.05 (MONUMENT SIGN
 DETAILS).
  
 6.) ADD NOTE TO SEE DETAIL ON SHEET A0.05 AT THE
 LOCATION OF THE MONUMENT SIGN ON SHEET A1.01 (SITE
 PLAN).
  
 7.) GENERAL SITE PLAN NOTE #5 ON SHEET A1.01 (SITE
 PLAN), STATES THAT THE SANITARY LINE WILL BE CONNECTED
 TO THE ADJACENT PROPERTY LIFT STATION. PER CONDITION OF
 APPROVAL IN ORDINANCE NO. 4757-17, THE DEVELOPER SHALL
 PROVIDE AN AGREEMENT FOR THE CONNECTION. PLEASE
 ADDRESS.
  
 8.) GENERAL SITE PLAN NOTE #12 SHOULD STATE THAT THERE
 SHALL NOT BE ANY LANDSCAPE MATERIAL WITHIN 5 FT. OF
 UNDERGROUND UTILITIES (NOT LOCATED WITHIN 5 FT. OF
 UNDERGROUND UTILITIES). PLEASE CORRECT.
  
 9.) ALL EXTERIOR LIGHTING SHALL BE SHIELDED TO REDUCE
 GLARE AND SHALL BE ARRANGED TO REFLECT LIGHT OR GLARE
 AWAY FROM ALL ADJACENT RESIDENTIAL DISTRICTS, ADJACENT
 RESIDENCES OR PUBLIC THOROUGHFARES. PLEASE REVIEW
 PHOTOMETRIC PLAN AND ENSURE THE PLAN DEMONSTRATES
 COMPLIANCE. PLEASE ADD NOTE IN THE PHOTOMETRIC PLAN IF
 CONSISTENT WITH THE ZLDR FOR EXTERIOR LIGHTING. [ZLDR
 S.94-309(A)]
  

Review Stop Z ZONING
Rev No 2 Status P Date 11-21-2017 Cont ID  
Sent By llouie Date 11-21-2017 Time   Rev Time 0.00
Received By llouie Date 11-21-2017 Time   Sent To  
Notes
2018-02-12 11:40:55CONDITIONS OF APPROVAL:
  
 1.) PRIOR TO CITY COMMISION, THE APPLICANT SHALL BE
 REQUIRED TO COMPLETE THE FOLLOWING: A) REVISE THE SITE
 PLAN AND LANDSCAPE PLAN TO MATCH THE ENGINEERING PLAN;
 B) ANY EXISTING AND/OR PROPOSED LANDSCAPE MATERIAL
 WITHIN FIVE (5) FEET OF UNDERGROUND UTILITIES SHALL BE
 RELOCATED IN THE LANDSCAPE PLAN. C) REVISE THE DETAIL
 OF THE PERMANENT FREESTANDING IDENTIFICATION SIGN
 LOCATED AT THE NORTHWEST CORNER OF THE PROPERTY, TO
 COMPLY WITH THE DIMENSIONAL STANDARDS OF SECTION 94-407
 OF THE ZONING AND LAND DEVELOPMENT REGULATIONS (ZLDRS).
  
 2.) THE SITE PLAN SHALL BE CONTINGENT ON THE APPROVAL
 OF A CITY-INITIATED TEXT AMENDMENT TO THE ZONING AND
 LAND DEVELOPMENT REGULATIONS (ZLDRS) TO ALLOW FOR A
 PARKING REDUCTION OF UP TO 50 PERCENT FOR ELDERLY
 HOUSING. FAILURE TO ADOPT THE PARKING REDUCTION INTO
 THE ZLDRS THAT IS CONSISTENT WITH THE PROJECT (ELDERLY
 HOUSING CONSISERED 55+) WILL TERMINATE THE APPROVAL OF
 THE SITE PLAN.
  
 3.) PRIOR TO THE SUBMISSION OF A BUILDING PERMIT, THE
 DEVELOPER SHALL PROVIDE EITHER AN AGREEMENT FOR A
 CONNECTION TO A PRIVATE LIFT STATION OFF-SITE, OR
 DESIGN A NEW ON-SITE LIFT STATION AND CONNECTION TO THE
 CITY'S SANITARY SEWER SERVICE.
  
 4.) THE DEVELOPER SHALL WORK WITH THE PROPERTY OWNER OF
 THE ADJACENT PROPERTY TO MODIFY THE SHARED ACCESS
 ENTRANCE ON COMMUNITY DRIVE FOR A.D.A. COMPLIANCE.
 MIODIFICATION TO THE ENTRANCE WILL REQUIRE A
 RIGHT-OF-WAY PERMIT FROM PALM BEACH COUNTY, AS
 COMMUNITY DRIVE IS A COUNTY ROADWAY. THE DEVELOPER
 SHALL BE REQUIRED TO OBTAIN THE COUNTY RIGHT-OF-WAY
 PERMIT PRIOR TO THE ISSUANCE OF A BUILDING PERMIT.
  
 5.) PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT - PLANNING DIVISION.
  
 6.) PRIOR TO THE SUBMISSION OF A BUILDING PERMIT, AN
 ENGINEERING DEVELOPMENT APPROVAL APPLICATION SHALL BE
 REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  

Review Stop Z ZONING
Rev No 1 Status F Date 09-07-2017 Cont ID  
Sent By llouie Date 09-07-2017 Time   Rev Time  
Received By llouie Date 09-07-2017 Time   Sent To  
Notes
2017-09-07 08:29:02GENERAL COMMENTS:
  
 1.) THE APPLICATION IS SEEKING A 40 PERCENT PARKING
 REDUCTION FROM THE CITYWIDE PARKING STANDARDS FOR
 MULTIFAMILY RESIDENTIAL. CURRENTLY, THE PLANNING
 DIVISION IS IN THE PROCESS OF PROCESSING A ZLDR TEXT
 AMENDMENT THAT WOULD REDUCE THE PARKING REQUIREMENT (UP
 TO 40%) FOR SENIOR HOUSING PROJECTS. THE SCHEDULE FOR
 PROCESSING THE ZLDR TEXT AMENDMENT IS UNCERTAIN AT THIS
 TIME. ACCORDING TO THE JUSTIFICATION STATEMENT, IT IS
 THE APPLICANT?S INTENT TO PROCESS THE APPLICATION
 ALONGSIDE WITH THE CITY-INITIATE ZLDR TEXT AMENDMENT.
 THE APPLICANT ALSO UNDERSTANDS THAT THE SITE PLAN WILL
 NOT BE APPROVED UNTIL THE TEXT AMENDMENT IS FORMALLY
 ADOPTED BY THE CITY.
  
 2.) PROVIDE A TRAFFIC LETTER FROM THE PALM BEACH COUNTY
 TRAFFIC DIVISION STATING THAT THE PROPOSED PROJECT
 MEETS THE TRAFFIC PERFORMANCE STANDARDS (TPS) OF THE
 COUNTY. THE COUNTY LETTER APPROVING THE TPS STANDARDS
 OF THE COUNTY SHALL BE RECEIVED BY STAFF PRIOR TO
 SCHEDULING THE APPLICATION FOR A PUBLIC HEARING.
  
 3.) PROVIDE A SCHOOL CAPACITY AVAILABILITY
 DETERMINATION (SCAD) LETTER FROM THE SCHOOL DISTRICT OF
 PALM BEACH COUNTY STATING THAT THE PROPOSED PROJECT
 MEETS THE SCHOOL CONCURRENCY REQUIREMENTS OF THE
 COUNTY. THE SCAD LETTER APPROVING SCHOOL CONCURRENCY
 SHALL BE SUBMITTED TO STAFF PRIOR TO SCHEDULING THE
 APPLICATION FOR A PUBLIC HEARING.
  
 4.) THE SURVEY SHOWS A 10 FT. WIDE UTILITY AND ROW
 EASEMENT ALONG THE NORTH AND EAST PROPERTY LINES.
 ACCORDING TO ORB RECORDS, FDOT MAY HAVE AN INTEREST IN
 THE ROW EASEMENT. THE APPLICANT WILL BE REQUIRED TO
 OBTAIN WRITTEN DOCUMENTATION FROM FDOT AND PALM BEACH
 COUNTY TRAFFIC (COMMUNITY DRIVE IS A COUNTY ROADWAY),
 STATING THAT THE ROW EASEMENT IS NOT NEEDED, AS THIS
 MAY IMPLICATE THE BUILDING SETBACK LINE ALONG THE NORTH
 AND EAST SIDES OF THE PROPERTY.
  
 5.) THE APPLICANT WILL BE RESPONSIBLE FOR THE ENVELOPES
 AND ADDRESSED LABELS FOR THE PUBLIC NOTICE MAILERS. A
 SIGNED AND NOTARIZED PUBLIC NOTICE MAILER AFFIDAVIT
 WILL BE REQUIRED PRIOR TO EACH PUBLIC HEARING.
  
 6.) ALL PRIVATE DEVELOPMENT PROJECTS, INCLUDING NEW
 CONSTRUCTION, OR THE RENOVATION OR IMPROVEMENT OF AN
 EXISTING BUILDING, WHERE THE TOTAL CONSTRUCTION COSTS
 ARE EQUAL TO OR GREATER THAN $750,000.00 IS SUBJECT TO
 THE ART IN PUBLIC PLACES REQUIREMENTS OF CHAPTER 78,
 ARTICLE V, OF THE CITY'S CODE OF ORDINANCES.
  
  
 SITE PLAN COMMENTS:
  
 1.) PROVIDE DETAILS AND DIMENSIONS ON THE PROPOSED
 MONUMENT SIGN AT THE NORTHWEST CORNER OF THE PROPERTY.
 INCLUDE ANY SETBACK DIMENSIONS FROM THE PROPERTY
 LINE(S). PLEASE NOTE THAT THE PROPOSED MONUMENT SIGN
 SHALL COMPLY WITH THE SIGNAGE REQUIREMENTS OF ZLDR
 S.94-407.
  
 2.) ADD DIMENSIONS TO THE LANDSCAPE ISLANDS (I.E.
 WIDTH).
  
 3.) THERE ARE TWO (2) EXISTING TRANSFORMER PADS LOCATED
 ALONG THE NORTH PROPERTY LINE, WHICH SEEMS TO BE
 MISSING FROM THE SITE PLAN. PLEASE INCLUDE THE
 TRANSFORMERS IN THE SITE PLAN FOR CONSISTENCY.
  
 4.) WHERE IS THE LOCATION OF A/C UNITS/MECHANICAL
 EQUIPMENT (I.E. GROUND LEVEL OR ROOFTOP)? PLEASE NOTE
 THAT MECHANICAL EQUIPMENT SHALL BE SCREENED FROM VIEW
 BY EITHER LANDSCAPING OR THE BUILDING PARAPET.
  
 5.) PHOTOMETRIC PLAN INDICATES THE USE OF POLE
 FIXTURES. PLEASE ILLUSTRATE THE LOCATION OF THESE
 FIXTURES IN THE SITE PLAN AND PROVIDE SETBACK
 DIMENSIONS FROM THE PROPERTY LINE. PLEASE NOTE THAT THE
 POLES MUST BE LOCATED A MINIMUM OF 5 FT. FROM THE
 PROPERTY LINE(S). ALSO, INCLUDE A DETAIL OF THE POLE
 FIXTURE IN THE PLAN.
  
 6.) HOW BIG ARE THE 1 BR AND 2BR UNITS?
  
 7.) ADD OUTDOOR/PEDESTRIAN AMENITIES (I.E. BENCHES,
 GAZEBO, WALKING PATH AROUND THE LAKE, ETC.) FOR THE
 RESIDENTS OF THE PROPOSED DEVELOPMENT.
  
 8.) ADD TRAFFIC CALMING/CROSSWALKS LEADING FROM THE
 PARKING LOT TO THE BUILDING.
  
 9.) THE PROPOSED BICYCLE RACKS MUST DEMONSTRATE THAT
 ALL THE MINIMUM DIMENSIONS HAVE BEEN MET PER THE CITY'S
 BICYCLE PARKING STANDARDS (I.E. DISTANCE FROM EACH THE
 END OF THE RACK TO THE BUILDING/PAVEMENT. THIS IS TO
 ENSURE THAT THERE IS SUFFICIENT SPACE FOR BICYCLE
 PARKING AND THAT THE BICYCLE WILL NOT ENCROACH UPON ANY
 SIDEWALK/WALKING PATH). PLEASE ILLUSTRATE COMPLIANCE
 WITH DIMENSIONS.
  
 10.) THE BICYCLE RACK LOCATED FURTHEST EAST SEEMS TO
 ENCROACH UPON LANDSCAPE. THIS IS NOT PERMITTED. PLEASE
 ADDRESS.
  
 11.) THERE SEEMS TO BE A DOOR LOCATED ON THE NORTH SIDE
 OF THE BUILDING; HOWEVER, THERE DOES NOT SEEM TO BE A
 WALKING PATH LEADING FROM THE DOOR TO THE PARKING AREA
 AND/OR SIDEWALK. PLEASE ADDRESS.
  
 12.) THERE IS A PROPOSED T-TURNAROUND LOCATED AT THE
 NORTHEAST CORNER OF THE PROPERTY. HOWEVER, IT DOES NOT
 SEEM TO BE A PRACTICAL TURNAROUND FOR LARGER VEHICLES.
 WAS A CURB CUT CONSIDERED AT THIS LOCATION? THIS
 PROPOSED T-TURNAROUND MAY ALSO REQUIRE ADDITIONAL
 FEEDBACK FROM THE FIRE, ENGINEERING AND PUBLIC WORKS
 DEPT.
  
  
 LANDSCAPE COMMENTS:
  
 1.) THERE ARE TWO (2) EXISTING TRANSFORMER PADS LOCATED
 ALONG THE NORTH PROPERTY LINE WHICH SEEMS TO BE MISSING
 FROM THE LANDSCAPE PLAN. PLEASE SHOW THE EXISTING
 TRANSFORMER PADS IN THE LANDSCAPE PLAN TO DEMONSTRATE
 THAT THE PADS WILL NOT CONFLICT WITH THE PROPOSED
 LANDSCAPING.
  
 2.) SHOW LIGHT POLE FIXTURES IN THE LANDSCAPE PLAN TO
 DEMONSTRATE THAT THE FIXTURES WILL NOT INTERFERE WITH
 THE PROPOSED LANDSCAPE FOR THE PROJECT.
  
 3.) A TREE ALTERATION PERMIT WILL BE REQUIRED PRIOR TO
 THE REMOVAL OF ANY TREES ON THE PROPERTY.
  
 4.) PLEASE ADDRESS ANY ADDITIONAL LANDSCAPE COMMENTS
 PROVIDED BY THE CITY'S LANDSCAPE PLANNER, RAY CARANCI @
 (561) 822-1462. ALL LANDSCAPE COMMENTS SHALL BE
 SATISFIED PRIOR TO THE SCHEDULING OF THE APPLICATION
 FOR A PUBLIC HEARING.
  
  
 ARCHITECTURAL FLOOR PLANS AND ELEVATIONS:
  
 1.) FINAL ARCHITECTURAL PLANS SHALL BE SIGNED, DATED
 AND SEALED BY A FLORIDA REGISTERED ARCHITECT.
  
 2.) PLEASE ENSURE THAT ANY CHANGES TO THE SITE
 PLAN/LANDSCAPE AND PHOTOMETRIC PLAN ARE REFLECTED IN
 THE ARCHITECTURAL DRAWINGS FOR CONSISTENCY.
  
  
 LIGHTING PLAN:
  
 1.) THE PHOTOMETRIC PLAN SHALL BE SIGNED AND SEALED BY
 A FLORIDA REGISTERED PROFESSIONAL ENGINEER.
  
 2.) PROVIDE A DETAIL (INCLUDING DIMENSIONS) OF THE
 PROPOSED POLE FIXTURES.
  
 3.) THERE SEEMS TO BE AN EXISTING TRANSFORMER ALONG THE
 NORTH PROPERTY LINE THAT IS MISSING FROM THE
 PHOTOMETRIC PLAN. PLEASE INCLUDE THE PAD IN THE PLAN
 FOR CONSISTENCY.
  
 4.) PER ZLDR S.94-309(A), ALL OUTDOOR LIGHTING SHALL BE
 SHIELDED TO REDUCE GLARE AND SHALL BE ARRANGED TO
 REFLECT LIGHT OR GLARE AWAY FROM ALL ADJACENT
 RESIDENTIAL DISTRICTS, ADJACENT RESIDENCES, OR PUBLIC
 THROUGHFARES.
  
  
 INSTRUCTIONS FOR RESUBMITTAL:
  
 * WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF
 FIFTEEN (15) PAPER COPIES, ONE (1) REDUCED COPY IN 8.5
 INCHES X 11 INCHES AND ONE (1) SET IN 11 INCHES X 17
 INCHES, AND AN ELECTRONIC COPY OF ALL PLANS. PLEASE
 NOTE THAT CHANGES ON THE RESUBMITTED PLANS MAY RESULT
 IN ADDITIONAL COMMENTS.
  
 * PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20 PERCENT OF THE ORIGINAL APPLICATION FEE
 ($600.00).
  
 * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE
 QUESTIONS.

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved