| Plan Review Stops For Project Z17060018 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
07-11-2017 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
07-11-2017 |
Time |
19:41 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
08-08-2017 |
Time |
11:17 |
Sent To |
|
|
| Notes |
| 2017-07-11 19:41:15 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR PERMITTING. | | | | | | 2. NEW FLOOD INSURANCE RATE MAPS (FIRMS) WILL BE | | | ADOPTED BEFORE OCTOBER 2017. THE PROPOSED BUILDING MAY | | | BE IN FLOOD ZONE. THE CURRENT REQUIREMENT IS FOR THE | | | ELEVATION OF THE FIRST FLOOR OF THE BUILDING AND ALL | | | ASSOCIATED MECHANICAL EQUIPMENT (CHILLERS, GENERATORS | | | ETC.) SHALL BE 12 INCHES (FREEBOARD) ABOVE THAT BASE | | | FLOOD ELEVATION. PLEASE NOTE THAT THERE IS A PROPOSAL | | | TO INCREASE THE FREEBOARD TO 24 INCHES SOMETIME AFTER | | | THE MIDDLE OF MAY 2017. | | | | | | 3. BUILDING SIZE. WHEN SUBMITTED FOR BUILDING PERMIT, | | | THE PLANS SHALL SHOW THAT THE TYPE OF CONSTRUCTION FOR | | | THE BUILDINGS WILL BE IN ACCORDANCE WITH THE HEIGHT, | | | AREA AND OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE | | | FLORIDA BUILDING CODE | | | | | | 4. BUILDING LOCATION RELATIVE TO THE PROPERTY LINE AND | | | OTHER STRUCTURES. WHEN SUBMITTED FOR BUILDING PERMIT, | | | COMPLIANCE WITH ALL BUILDING SEPARATION, PERCENTAGE OF | | | OPENINGS AND OPENING PROTECTIVE REQUIREMENTS OF | | | CHAPTERS 6 AND 7 OF THE FLORIDA BUILDING CODE SHALL BE | | | VERIFIED. | | | | | | 5. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, GAS SYSTEMS, GENERATORS, FIRE ALARM SYSTEMS, | | | FIRE SPRINKLER AND OTHER FIRE SUPPRESSION SYSTEMS, | | | GREASE INTERCEPTORS, SITE LIGHTING, SITE LANDSCAPE, | | | SITE IRRIGATION, ETC. | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
4 |
Status |
P |
Date |
12-27-2017 |
|
|
Cont ID |
|
| Sent By |
squinone |
Date |
12-27-2017 |
Time |
|
Rev Time |
0.00 |
| Received By |
squinone |
Date |
12-20-2017 |
Time |
|
Sent To |
|
|
| Notes |
| 2017-12-27 08:40:19 | CITY OF WEST PALM BEACH | | | ENGINEERING SERVICES DEPARTMENT | | | DATE: 12/27/2017 | | | PROJECT: TUXEDO AVENUE WAREHOUSE (Z17060018) | | | ADDRESS: 1510 TUXEDO AVE | | | STATUS: PASSED | | | | | | THIS IS AN INITIAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS, AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL | | | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. | | | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS | | | CAN BE DOWNLOADED FROM THE FOLLOWING WEBSITE LINK: HTTP | | | ://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,- | | | PERMITS-APPLICATIONS | | | | | | 2. PLEASE SUBMIT THE LATEST VERSION OF THE 'AUTO-CALC | | | CERTIFIED COST ESTIMATE FORM' FOR SUBMISSION TO CITY OF | | | WEST PALM BEACH PUBLIC WORKS DEPARTMENT FOR ADDITIONAL | | | WORK PROPOSED. THIS FORM CAN BE DOWNLOADED FROM THE | | | FOLLOWING LINK: HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING- | | | PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS | | | | | | SOFIA QUINONES-BENEJAM, EI | | | PROJECT ENGINEER | | | CITY OF WEST PALM BEACH | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33402 | | | (MAILING ADDRESS: PO BOX 3366) | | | P: 561.494.1108 | | | C: 561.459.6518 | | | F: 561.494.1116 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
3 |
Status |
P |
Date |
11-28-2017 |
|
|
Cont ID |
|
| Sent By |
squinone |
Date |
11-28-2017 |
Time |
|
Rev Time |
0.00 |
| Received By |
squinone |
Date |
11-28-2017 |
Time |
|
Sent To |
|
|
| Notes |
| 2017-11-28 16:23:15 | CITY OF WEST PALM BEACH | | | ENGINEERING SERVICES DEPARTMENT | | | DATE: 11/28/2017 | | | PROJECT: TUXEDO AVENUE WAREHOUSE (Z17060018) | | | ADDRESS: 1510 TUXEDO AVE | | | STATUS: PASSED | | | | | | THIS IS AN INITIAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS, AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL | | | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. | | | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS | | | CAN BE DOWNLOADED FROM THE FOLLOWING WEBSITE LINK: HTTP | | | ://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,- | | | PERMITS-APPLICATIONS | | | | | | 2. PLEASE SUBMIT THE LATEST VERSION OF THE 'AUTO-CALC | | | CERTIFIED COST ESTIMATE FORM' FOR SUBMISSION TO CITY OF | | | WEST PALM BEACH PUBLIC WORKS DEPARTMENT FOR ADDITIONAL | | | WORK PROPOSED. THIS FORM CAN BE DOWNLOADED FROM THE | | | FOLLOWING LINK: | | | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR | | | MS,-PERMITS-APPLICATIONS | | | | | | SOFIA QUINONES-BENEJAM, EI | | | PROJECT ENGINEER | | | CITY OF WEST PALM BEACH | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33402 | | | (MAILING ADDRESS: PO BOX 3366) | | | P: 561.494.1108 | | | C: 561.459.6518 | | | F: 561.494.1116 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
F |
Date |
10-26-2017 |
|
|
Cont ID |
|
| Sent By |
squinone |
Date |
10-26-2017 |
Time |
|
Rev Time |
0.00 |
| Received By |
squinone |
Date |
10-26-2017 |
Time |
|
Sent To |
|
|
| Notes |
| 2017-10-26 14:27:58 | CITY OF WEST PALM BEACH | | | ENGINEERING SERVICES DEPARTMENT | | | PROJECT NAME: TUXEDO AVENUE WAREHOUSE ? 1510 TUXEDO | | | AVE. - Z17060018 | | | STATUS: FAILED | | | | | | THIS IS AN INITIAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS, AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | THE FOLLOWING GENERAL COMMENTS MUST BE ADDRESSED PRIOR | | | TO ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL: | | | | | | 1. PROPOSED WATER AND SANITARY SEWER SERVICE MUST BE | | | CONNECTED TO THE EXISTING WATER AND SEWER MAINS LOCATED | | | ON THE PROPERTY FRONTAGE ROADS EITHER TUXEDO AVE. OR | | | POINT RD.; | | | | | | 2. REFER TO CITY?S STANDARD DETAIL GC-1 FOR CONCRETE | | | SIDEWALK; | | | | | | 3. REFER TO CITY?S STANDARD DETAIL GC-3 FOR CONCRETE | | | CURB & GUTTER; | | | | | | 4. REFER TO CITY?S STANDARD DETAIL GC-7 FOR CONCRETE | | | DRIVEWAY APRONS; | | | | | | AFTER THE SITE PLAN IS APPROVED, IN THE NEXT PHASE, THE | | | FOLLOWING GENERAL COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL: | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL | | | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. | | | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS | | | CAN BE DOWNLOADED FROM THE FOLLOWING WEBSITE LINK: HTTP | | | ://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,- | | | PERMITS-APPLICATIONS | | | | | | 2. PLEASE SUBMIT THE LATEST VERSION OF THE ?AUTO-CALC | | | CERTIFIED COST ESTIMATE FORM? FOR SUBMISSION TO CITY OF | | | WEST PALM BEACH PUBLIC WORKS DEPARTMENT FOR ADDITIONAL | | | WORK PROPOSED. THIS FORM CAN BE DOWNLOADED FROM THE | | | FOLLOWING LINK: HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING- | | | PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS | | | | | | 3. WHAT IS THE PLAN FOR FIRE PROTECTION FOR THE | | | PROPOSED BUILDING? SHOW PROPOSED FIRE LINE AND BACKFLOW | | | PREVENTER, METER ASSEMBLY ETC. IN THE UTILITY PLAN | | | DURING FINAL PLANS SUBMITTALS; | | | | | | 4. SUBMIT WITH THE ENGINEERING DEVELOPMENT APPROVAL | | | APPLICATION SIGNED & SEALED ENGINEER/MEP WATER AND | | | SANITARY SEWER CALCULATION (IN DETAIL I.E. AVERAGE AND | | | PEAK WITH PEAKING FACTOR). SUBMIT CALCULATIONS TO | | | VALIDATE METER SIZE SELECTION. SHOW THESE CALCULATIONS | | | ON THE UTILITY PLAN SHEET AS WELL; | | | | | | 5. SHOW THE NEAREST FIRE HYDRANT TO THIS SITE ON THE | | | FINAL UTILITY PLAN. FIRE HYDRANT FLOW TEST DATA FROM | | | EXISTING FIRE HYDRANT WILL BE REQUIRED PART OF THE PLAN | | | SUBMITTAL. SHOW HYDRANT FLOW TEST DATA RESULT ON THE | | | PLANS; | | | | | | 6. PLEASE INCLUDE THE LATEST VERSION OF THE APPLICABLE | | | CITY OF WEST PALM BEACH STANDARD UTILITY DETAILS TO THE | | | DETAIL SHEET/S DURING SUBMISSION OF THE FINAL | | | ENGINEERING PLANS. CONTACT THE ENGINEERING SERVICES | | | DEPARTMENT FOR THE LATEST REVISED DETAILS IN CAD | | | FORMAT. CITY?S STANDARD DETAILS (IN PDF FILE FORMAT) | | | CAN BE DOWNLOADED FROM THE FOLLOWING SITE: HTTP://WPB.O | | | RG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PERMITS- | | | APPLICATIONS | | | | | | 7. PLACEMENT OF THE ANY PROPOSED METER, BACKFLOW | | | PREVENTER, DCDA ETC. SHALL BE INSTALLED PER THE CITY?S | | | STANDARD DETAILS. WATER METER SHOULD BE WITHIN THE | | | RIGHT-OF-WAY OR INSIDE AN 'UTILITY EASEMENT' JUST | | | INSIDE THE PROPERTY NEAR THE RIGHT-OF-WAY AND | | | ACCESSIBLE; | | | | | | 8. IN THE FINAL PLANS, MUST PROVIDE UTILITY CONFLICT | | | TABLE (BOTTOM AND TOP OF CROSSING PIPES) AT THE | | | CONFLICT POINTS OF ALL WATER, STORM AND SANITARY SEWER | | | PIPES AS WELL AS OTHER FRANCHISE UTILITIES. EXISTING | | | UTILITIES WITHIN THE PROPOSED SANITARY SEWER LATERAL | | | ARE TO BE VERIFIED VIA SOFTDIGS, PROVIDE ALL UTILITY | | | CROSSING INFORMATION; | | | | | | 9. IN THE FINAL PLANS, SHOW DIRECTION OF FLOW FOR THE | | | EXISTING SANITARY SEWER. SHOW INVERT AT CONNECTION | | | POINTS AND INCLUDE A PROFILE FOR THE PROPOSED SERVICE | | | LATERAL WITH GROUND ELEVATIONS ABOVE THE PIPE; | | | | | | 10. FOR THE FINAL WATER AND SEWER PLANS, INCLUDE A NOTE | | | THAT: AS OF DECEMBER 20, 2015 THE CITY OF WEST PALM | | | BEACH CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, | | | MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD | | | FREE." FOR MORE INFORMATION REFER TO THE LINK BELOW: HT | | | TP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLICA | | | TIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL | | | | | | SOFIA QUINONES-BENEJAM, EI | | | PROJECT ENGINEER | | | CITY OF WEST PALM BEACH | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33402 | | | (MAILING ADDRESS: PO BOX 3366) | | | P: 561.494.1108 | | | C: 561.459.6518 | | | F: 561.494.1116 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
07-11-2017 |
|
|
Cont ID |
|
| Sent By |
mkhan |
Date |
07-11-2017 |
Time |
17:02 |
Rev Time |
0.00 |
| Received By |
mkhan |
Date |
07-11-2017 |
Time |
17:02 |
Sent To |
|
|
| Notes |
| 2017-07-11 17:03:03 | CITY OF WEST PALM BEACH | | | ENGINEERING SERVICES DEPARTMENT | | | | | | PROJECT NAME: TUXEDO AVENUE WAREHOUSE - 1510 TUXEDO | | | AVE. - Z17060018 | | | | | | RESPONSE: FAILED | | | | | | DATE: JULY 11, 2017 | | | | | | THIS IS AN INITIAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS, AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | | | | THE FOLLOWING GENERAL COMMENTS MUST BE ADDRESSED PRIOR | | | TO ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL: | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL | | | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. | | | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS | | | CAN BE DOWNLOADED FROM THE FOLLOWING WEBSITE LINK: | | | | | | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR | | | MS,-PERMITS-APPLICATIONS | | | | | | 2. PLEASE SUBMIT THE LATEST VERSION OF THE "AUTO-CALC | | | CERTIFIED COST ESTIMATE FORM" FOR SUBMISSION TO CITY OF | | | WEST PALM BEACH PUBLIC WORKS DEPARTMENT FOR ADDITIONAL | | | WORK PROPOSED. THIS FORM CAN BE DOWNLOADED FROM THE | | | FOLLOWING LINK: | | | | | | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR | | | MS,-PERMITS-APPLICATIONS | | | | | | 3. PROPOSED WATER AND SANITARY SEWER SERVICE SHALL BE | | | CONNECTED TO THE EXISTING WATER AND SEWER MAINS LOCATED | | | ON THE PROPERTY FRONTAGE ROADS I.E. TUXEDO AVE. OR | | | POINT RD.; | | | | | | 4. APPLY FOR COMMERCIAL ACCOUNT FOR SANITATION/GARBAGE | | | COLLECTION THROUGH PUBLIC WORKS DEPARTMENT; | | | | | | 5. INSTALL SIDEWALK AT THE FRONTAGE OF THE PROPERTY ON | | | TUXEDO AVE. AND POINT RD. SHOW ON THE FINAL PLANS 5-FT | | | WIDE SIDEWALK AND ADA ACCESSIBLE RAMPS FOR THE PROPOSED | | | DRIVE/ACCESS AND ADD A DETAIL FOR THE SPECIFIC RAMP | | | TYPE; | | | | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
07-07-2017 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
07-07-2017 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
07-07-2017 |
Time |
09:54 |
Sent To |
|
|
| Notes |
| 2017-07-07 10:03:16 | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, | | | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM | | | BEACH FIRE RESCUE. | | | | | | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE | | | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. | | | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS | | | ARE SUBMITTED FOR PERMIT. | | | | | | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE | | | PROPOSED PROJECT. | | | | | | 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY | | | WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE | | | PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A | | | PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED | | | TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN | | | STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY | | | MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER | | | PROTECTION. | | | | | | | | | 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY | | | IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING | | | ALL CONSTRUCTION ACTIVITIES. | | | | | | | | | 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM | | | ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION. | | | ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND | | | AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT | | | WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS. | | | | | | | | | 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE | | | REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE | | | ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS. | | | | | | | | | 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH | | | THE 5TH EDITION OF THE FLORIDA FIRE PREVENTION CODE, | | | INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES. | | | | | | | | | 6. FOR PLAN REVIEW SUBMITTAL, PLEASE INCLUDE THE | | | OCCUPANCY TYPE, PER THE FLORIDA FIRE PREVENTION CODE, | | | AND WHETHER IT IS MIXED OR SEPARATED OCCUPANCY. | | | | | | | | | 7. FOR PLAN REVIEW SUBMITTAL, PLEASE ENSURE THAT A FIRE | | | LOAD CALCULATION IS INCLUDED AND THAT ADEQUATE WATER | | | SUPPLY IS EXISTING OR WILL BE PROVIDED. | | | | | | | | | 8. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED | | | ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF | | | FIRE PREVENTION. | | | | | | | | | 9. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL | | | BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL | | | DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS, | | | EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A | | | PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE | | | SAFETY FEATURES AND EQUIPMENT. | | | | | | ONE EXIT IS INDICATED, FROM THE MEZZANINE AND THE | | | BUILDING. PLEASE ENSURE THE SINGLE REQUIREMENTS AND | | | DISTANCES FOR BOTH. | | | | | | AN ELEVATOR/LIFT IS INDICATED. ENSURE THAT AN AREA OF | | | REFUGE IS PROVIDED PER ALL THE APPLICABLE REQUIREMENTS. | | | | | | | | | | | | 10. AN OUTSIDE STORAGE AREA IS INDICATED, PLEASE | | | PROVIDE DETAILS REGARDING STORAGE OF FLAMMABLE FUEL | | | AND/OR HAZARDOUS MATERIALS. | | | | | | | | | 11. IT IS HIGHLY RECOMMENDED FOR ANY ACCESS GATES THAT | | | THEY BE PROVIDED WITH KNOX KEY ACCESS LOCKS, PADLOCKS | | | AND/OR SWITCHES FOR 24 HOUR EMERGENCY ACCESS. | | | | | | | | | 12. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT | | | DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | | | | 13. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING | | | PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH | | | THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
3 |
Status |
P |
Date |
12-27-2017 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
12-27-2017 |
Time |
14:51 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
12-27-2017 |
Time |
14:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
P |
Date |
11-02-2017 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
11-02-2017 |
Time |
15:10 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
11-02-2017 |
Time |
15:10 |
Sent To |
|
|
| Notes |
| 2017-11-02 15:10:52 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 | | | PROJECT: 1510 TUXEDO Z17060018 | | | NOVEMBER 1, 2017 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. SATISFIED. PLEASE UPDATE PLAN TO CURRENT LANDSCAPE | | | CODE AS OF APRIL 21, 2017. THESE UPDATES INCLUDE TREE | | | AND FLOWERING TREE REQUIREMENTS, FLORIDA FRIENDLY | | | LANDSCAPE REQUIREMENTS, AND SUBSTITUTION OF PALM TREES. | | | | | | 2. SATISFIED. PLEASE PROVIDE LOCATIONS OF LIGHTING ON | | | THE LANDSCAPE PLAN TO AVOID CONFLICTS WITH LANDSCAPING. | | | | | | 3. SATISFIED. PLEASE SHOW LOCATIONS OF WATER AND SEWER | | | LINES ON THE LANDSCAPE PLAN AND RESOLVE CONFLICTS WITH | | | LANDSCAPING. | | | | | | 4. SATISFIED. CALCULATION OF OPEN SPACE REQUIRED FOR | | | TREE AND SHRUB CALCULATIONS IS BASED ON 40 PERCENT | | | REQUIRED. | | | | | | 5. SATISFIED. PLEASE SHOW CALCULATIONS FOR BUFFER TREE | | | REQUIREMENTS. | | | | | | 6. SATISFIED. THE LANDSCAPE BUFFER TREES AND HEDGE CAN | | | BE LOCATED TO OTHER LOCATIONS ON THE SITE IF THE | | | BUILDING IS LOCATED AT ZERO SETBACK FOR THE EAST AND | | | SOUTH SIDES. | | | | | | 7. SATISFIED. SOME LANDSCAPE AREA CAN BE GAINED IF THE | | | CURB IS LOCATED IN PLACE OF WHEEL STOPS, ALLOWING THE | | | OVERHANG TO BE GRASS OR GROUNDCOVER. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
07-10-2017 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
07-10-2017 |
Time |
16:51 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
07-10-2017 |
Time |
16:51 |
Sent To |
|
|
| Notes |
| 2017-07-10 16:52:05 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 | | | PROJECT: 1510 TUXEDO Z17060018 | | | JULY 10, 2017 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. PLEASE UPDATE PLAN TO CURRENT LANDSCAPE CODE AS OF | | | APRIL 21, 2017. THESE UPDATES INCLUDE TREE AND | | | FLOWERING TREE REQUIREMENTS, FLORIDA FRIENDLY LANDSCAPE | | | REQUIREMENTS, AND SUBSTITUTION OF PALM TREES. | | | | | | 2. PLEASE PROVIDE LOCATIONS OF LIGHTING ON THE | | | LANDSCAPE PLAN TO AVOID CONFLICTS WITH LANDSCAPING. | | | | | | 3. PLEASE SHOW LOCATIONS OF WATER AND SEWER LINES ON | | | THE LANDSCAPE PLAN AND RESOLVE CONFLICTS WITH | | | LANDSCAPING. | | | | | | 4. CALCULATION OF OPEN SPACE REQUIRED FOR TREE AND | | | SHRUB CALCULATIONS IS BASED ON 40 PERCENT REQUIRED. | | | | | | 5. PLEASE SHOW CALCULATIONS FOR BUFFER TREE | | | REQUIREMENTS. | | | | | | 6. THE LANDSCAPE BUFFER TREES AND HEDGE CAN BE LOCATED | | | TO OTHER LOCATIONS ON THE SITE IF THE BUILDING IS | | | LOCATED AT ZERO SETBACK FOR THE EAST AND SOUTH SIDES. | | | | | | 7. SOME LANDSCAPE AREA CAN BE GAINED IF THE CURB IS | | | LOCATED IN PLACE OF WHEEL STOPS, ALLOWING THE OVERHANG | | | TO BE GRASS OR GROUNDCOVER. | | | |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
4 |
Status |
P |
Date |
01-05-2018 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
01-05-2018 |
Time |
15:49 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
01-05-2018 |
Time |
16:02 |
Sent To |
|
|
| Notes |
| 2018-01-05 16:02:20 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | SENIOR PLANNER'S 12/19/2017 REVIEW PACKAGE: | | | | | | 1. THE PROPOSED GRAVITY WALL ALONG THE EAST PROPERTY | | | LINE CANNOT EXTEND PAST THE PROPERTY LINE. REVISE | | | PERIMETER ELEVATION DETAIL "PE2" TO: (A) SHOW THE | | | VERTICAL FACE OF THE GRAVITY RETAINING WALL AT OR WEST | | | OF THE EAST PROPERTY LINE AND THE SLOPED FACE TOWARD | | | THE INTERIOR OF THE SITE; OR (B) SHOW THE GRAVITY | | | RETAINING WALL SHIFTED TO THE WEST SO THAT IT IS | | | ENTIRELY WITHIN THE PROPERTY. CONSIDER THAT A TEMPORARY | | | CONSTRUCTION EASEMENT MAY BE NEEDED FROM THE ADJACENT | | | PROPERTY OWNER IN ORDER TO CONSTRUCT THE GRAVITY WALL | | | ON THE PROPERTY LINE. THESE REVISIONS CAN BE SHOWN WHEN | | | THE PLANS ARE SUBMITTED FOR ENGINEERING PERMIT. | | | | | | 2. FOR ENGINEERING PERMIT APPROVAL, AN EROSION AND | | | SEDIMENT CONTROL PLAN WILL BE REQUIRED. | | | | | | 3. DRAINAGE CALCULATIONS WILL NEED TO BE SUBMITTED WITH | | | THE ENGIENERING PERMIT APPLICATION AND WILL NEED TO | | | INCLUDE SITE SPECIFIC EXFILTRATION RATES. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | [email protected] | | | 561-494-1120 |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
3 |
Status |
F |
Date |
12-06-2017 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
12-06-2017 |
Time |
15:34 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
12-06-2017 |
Time |
16:31 |
Sent To |
|
|
| Notes |
| 2017-12-06 16:31:10 | THE COMMENTS BELOW ARE FROM THE REVIEW OF THE | | | ENGINEERING PLANS AND SURFACE WATER MANAGEMENT | | | CALCULATIONS SIGNED AND SEALED BY RONALD W. LAST, P.E. | | | ON 12/1/2017:. | | | | | | 1. SHOW MILL AND RESURFACE LIMITS FOR UTILITY TRENCH | | | CUTS IN THE ROADWAY ON THE ENGINEERING PLANS. | | | | | | 2. PROVIDE CROSS SECTION FOR DRIVEWAY APRON SHOWING | | | CROSS SLOPES AND MINIMUM 4 FEET WIDTH AT 2 PERCENT | | | CROSS SLOPE TO MEET ADA CRITERIA FOR SIDEWALK. | | | REMAINING DRIVEWAY SLOPE SHOULD NOT EXCEED 8% PER CITY | | | STANDARD DETAIL GC-7. | | | | | | 3. EXISTING GRADES FOR TUXEDO LANE SHOW THE NORTH BOUND | | | LANES SLOPE TOWARD THE PROJECT. INDICATE A SWALE | | | BETWEEN THE SIDEWALK AND EDGE OF PAVEMENT AND PROVIDE | | | TYPICAL CROSS SECTION FROM BACK OF WALK TO EDGE OF | | | PAVEMENT. INVERT OF SWALE DOES NOT NEED TO BE MORE THAN | | | 3 INCHES BELOW EDGE OF PAVEMENT. SWALE WON'T BE NEEDED | | | IN DRIVEWAY BUT EDGE OF PAVEMENT SHOULD SLOPE ALONG | | | DRIVEWAY TO CONVEY WATER TO THE SIDE(S) OF THE | | | DRIVEWAY. SWALE LONGITUDINAL SLOPE CAN FOLLOW THE SLOPE | | | OF THE ROAD (I.E. FROM SOUTH TO NORTH). | | | | | | 4. INVERT FOR MH#2 APPEARS TO BE LABELED WITH THE WRONG | | | DIRECTION. | | | | | | 5. INDICATE IF A RETAINING WALL WILL BE NEEDED ALONG | | | THE EAST PROPERTY LINE. THERE IS A 4 FOOT DROP FROM THE | | | EXISTING GRADE ALONG THE PROPERTY LINE TO PROPOSED | | | INTERIOR GRADES. | | | | | | 6. PROVIDE BACKUP FOR THE EXFILTRATION RATES SHOWN IN | | | THE SURFACE WATER MANAGEMENT CALCULATIONS. | | | | | | 7. EXFILTRATION STORAGE DOES NOT REACH 0.08 AC-FT UNTIL | | | STAGE 15.5 FEET NAVD, WHEN H2 IS 8.50 FEET. | | | | | | TRACY L. WARD, P.E | | | ENGINEERING SERVICES DEPARTMENT | | | [email protected] | | | 561-494-1120 |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
F |
Date |
11-22-2017 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
11-22-2017 |
Time |
15:50 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
11-22-2017 |
Time |
16:10 |
Sent To |
|
|
| Notes |
| 2017-11-22 16:09:16 | THE FOLLOWING COMMENTS ARE IN RESPONSE TO THE REVIEW OF | | | THE 10/24/2017 PACKAGE FROM THE SENIOR PLANNER. | | | | | | 1. SHOW A SWALE IN THE RIGHT-OF-WAY BETWEEN THE | | | SIDEWALK AND EDGE OF PAVEMENT. ADD A CROSS SECTION OR | | | SPOT GRADES TO INDICATE HOW THE SWALE SHOULD BE GRADED. | | | | | | 2. INCLUDE CITY'S STANDARD DETAIL FOR THE DRIVEWAY | | | APRON. | | | | | | 3. SITE PLAN CALLS OUT PERVIOUS CONCRETE IN THE STORAGE | | | AND PARKING AREA. DESCRIBE THE MATERIALS THAT WILL BE | | | STORED IN THIS AREA. | | | | | | 4. PROVIDE DRAINAGE ARROWS ON THE PRELIMINARY | | | ENGINEERING PLAN TO INDICATE DIRECTION OF SURFACE | | | RUNOFF. | | | | | | 5. THE PRELIMINARY ENGINEERING PLAN SHOWS A PERIMETER | | | BERM DETAIL WITH A MINIMUM BERM HEIGHT OF 13.52 FEET | | | NAVD FOR THE 10-YEAR 3-DAY PEAK STAGE. NO DRAINAGE | | | CALCULATIONS WERE PROVIDED TO CONFIRM THIS STAGE. SFWMD | | | REQUIRES RUNOFF TO BE CONTROLLED TO THE 25-YEAR 3-DAY | | | DESIGN STORM. ALL OF THE SITE APPEARS TO BE ABOVE THE | | | 13.52 ELEVATION SO IT IS UNCLEAR WHERE THIS BERM WOULD | | | BE NEEDED. SHOW ON THE PLAN WHERE A PERIMETER BERM WILL | | | BE NEEDED. | | | | | | 6. DRAINAGE CALCULATIONS DEMONSTRATING COMPLINANCE WITH | | | SFWMD ERP CRITERIA CAN BE SUBMITTED WITH THE | | | ENGINEERING DEVELOPMENT PERMIT APPLICATION. | | | | | | 7. ADD THE NAVD TO NGVD CONVERSION FACTOR TO THE SURVEY | | | / SITE PLAN DRAWING. | | | | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
08-08-2017 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
08-08-2017 |
Time |
11:16 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
08-08-2017 |
Time |
11:17 |
Sent To |
|
|
| Notes |
| 2017-08-08 11:17:36 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT | | | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT HTTP:// | | | WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PER | | | MITS-APPLICATIONS | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. PRELIMINARY, UPDATED FEMA FLOOD INSURANCE MAPS ARE | | | AVAILABLE AT | | | HTTP://MAPS.CO.PALM-BEACH.FL.US/GIS/FLOODZONES.ASPX?. | | | PLEASE REVIEW THE MAPS AND VERIFY THAT THE NEW MAPS | | | WILL NOT IMPACT THE PROPOSED PROJECT. | | | | | | 2. THE FREEBOARD REQUIREMENT FOR STRUCTURES IN A | | | SPECIAL FLOOD HAZARD AREA IS TWO FEET ABOVE BASE FLOOD | | | ELEVATION. | | | | | | 3. NO ENGINEERING PLANS WERE PROVIDED. | | | | | | 4. SITE PLAN SHOWS DRAINAGE INLETS AND EXFILTRATION | | | TRENCH. DRAINAGE SYSTEM TO BE DESIGN TO MEET SFWMD | | | CRITERIA FOR WATER QUALITY AND OFFSITE DISCHARGE. | | | | | | 5. SHOW UTILITIES ON THE LANDSCAPE PLANS. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL | | | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. | | | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS | | | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE | | | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS | | | | | | 2. PROVIDE A COPY OF THE SFWMD ERP PERMIT AND SIGNED | | | AND SEALED DRAINAGE CALCULATIONS. | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
3 |
Status |
P |
Date |
12-04-2017 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
12-04-2017 |
Time |
13:26 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
F |
Date |
11-03-2017 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
11-03-2017 |
Time |
10:09 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2017-11-03 10:12:27 | 1. THERE IS A 3' EASEMENT ALONG SOUTH PROPERTY LINE PER | | | PLAT THAT NEEDS TO BE ADDED TO ALL PLANS. | | | 2. WATER CONNECTION NEEDS TO BE MADE TO EITHER FRONTAGE | | | STREET. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
07-12-2017 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
07-12-2017 |
Time |
08:13 |
Rev Time |
|
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2017-07-12 08:13:35 | 1. NO PRELIMINARY ENGINEERING PLANS PROVIDED. | | | 2. UTILITY DEPT. WILL DETERMINE POINT OF CONNECTIONS TO | | | WATER AND SEWER SYSTEM. | | | 3. VERTICAL DATUM NEEDED ON SURVEY. EXISTING CLEAN-OUT | | | ON SITE PLAN NOT SHOWN ON SURVEY. | | | 4. WILL STORM DRAINAGE BE CONNECTED TO ANY OUTFALL? | | | 5. WHAT TYPE OF SURFACE IS PROPOSED FOR THE OUTDOOR | | | STORAGE? |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
2 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
12-21-2017 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
07-11-2017 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
07-11-2017 |
Time |
|
Sent To |
|
|
| Notes |
| 2017-07-11 17:42:52 | THIS IS AN INITIAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS, AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | THE FOLLOWING GENERAL COMMENTS MUST BE ADDRESSED PRIOR | | | TO ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL: | | | | | | 1 - CAN THE DRIVEWAY WIDTH BE REDUCED? | | | 2 - PROVIDE SIDEWALK ALONG LOT FRONTAGE. | | | | | | ERIK FERGUSON, P.E. | | | SENIOR PROJECT ENGINEER | | | 561-494-1092 | | | [email protected] |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
01-05-2018 |
Time |
|
Rev Time |
0.00 |
| Received By |
pgreilic |
Date |
01-05-2018 |
Time |
13:10 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
11-14-2017 |
Time |
|
Rev Time |
0.00 |
| Received By |
pgreilic |
Date |
11-14-2017 |
Time |
08:56 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
07-11-2017 |
|
|
Cont ID |
|
| Sent By |
|
Date |
07-11-2017 |
Time |
|
Rev Time |
0.00 |
| Received By |
pgreilic |
Date |
07-11-2017 |
Time |
15:56 |
Sent To |
|
|
| Notes |
| 2017-07-11 15:58:59 | ISPR 17-03 | | | Z17060018 | | | 1510 TUXEDO AVENUE | | | | | | | | | 1.) PROVIDE A SURVEY SHOWING EXISTING CONDITIONS OF THE | | | SITE | | | | | | 2.) PROVIDE PROPOSED PHOTOMETRIC PLAN | | | | | | 3.) PROVIDE A TURNAROUND AREA TO THE NORTH OF THE | | | PROPOSED DRIVE AISLE TO AVOID CARS FROM BACKING OUT | | | DIRECTLY ONTO TUXEDO AVENUE | | | | | | 4.) ONLY 8.5 FEET REQUIRED WIDTH INSTEAD OF 9 FOR | | | PARKING SPACE, CONSIDER REVISION | | | | | | 5.) ONLY 24 FEET DRIVE AISLE REQUIRED INSTEAD OF 26 | | | FEET, CONSIDER REVISION | | | | | | 6.) CONSIDER RELOCATING BUILDING TO 0? SETBACK ON SOUTH | | | AND EAST PROPERTY LINE TO ALLOW FOR ADDITIONAL | | | FOUNDATION PLANTING AND LANDSCAPE BUFFER ALONG THE WEST | | | PROPERTY LINE | | | | | | 7.) PROVIDE DETAILS FOR PARKING SPACES | | | | | | 8.) EXPAND SIDEWALK TO 5 FEET AND TIE INTO EXISTING | | | SIDEWALK ALONG TUXEDO AVENUE | | | | | | 9.) INDICATE LOCATION OF EXISTING OR PROPOSED FIRE | | | HYDRANTS WITHIN 250 FEET OF THE PROPOSED STRUCTURE(S) | | | | | | 10.) PROVIDE LOCATION OF DUMPSTER ENCLOSURE | | | | | | - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN | | | WRITTEN FORMAT. | | | | | | - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF ELEVEN | | | (11) PAPER COPIES AND AN ELECTRONIC COPY IN .PNG/.PDF | | | FORMAT OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE | | | RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS | | | TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL | | | COMMENTS. | | | | | | - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20% OF THE ORIGINAL APPLICATION FEE. | | | | | | - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT | | | RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS | | | FROM THE DATE OF THESE COMMENTS/THE PPRC MEETING (BY | | | 12/12/16), THE CASE SHALL BE CONSIDERED WITHDRAWN. ANY | | | FURTHER ACTION SHALL REQUIRE A NEW DEVELOPMENT | | | APPLICATION. | | | | | | PAUL GREILICH, SENIOR PLANNER | | | 561-822-1443 | | | [email protected] | | | | | | | | | |
|
|
| |
Print |