| 2017-05-05 15:35:39 | CITY OF WEST PALM BEACH |
| | ENGINEERING SERVICES DEPARTMENT |
| | |
| | DATE: 05/05/2017 |
| | |
| | Z17040017: 711 N. ROSEMARY AVE. - RESTAURANT/RETAIL |
| | REDEVELOPMENT (FSPR 17-10) |
| | |
| | THIS IS AN INITIAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS, AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. |
| | |
| | FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE PLAN |
| | APPROVAL: |
| | |
| | 1. SHOW ON THE SITE PLANS ADA ACCESSIBLE RAMPS ON THE |
| | SIDEWALK AT THE ENTRANCE AND EXIT /DRIVEWAY APPROACH; |
| | |
| | 2. PLEASE SUBMIT ESTIMATES FOR THE PEAK POTABLE WATER |
| | AND FIRE DEMAND; AND SANITARY SEWER FLOW FOR THE |
| | PROPOSED RESTAURANTS. |
| | |
| | 3. PLANS DO NOT CLEARLY SHOW HOW THE BUILDING WILL BE |
| | SERVED FOR WATER, SEWER AND FIRE PROTECTION. PLEASE |
| | SUBMIT PLANS SHOWING ALL EXISTING UTILITIES IN THE |
| | VICINITY OF THE SITE AND LABEL THEIR SIZE AND |
| | MATERIALS. ALSO SHOW PROPOSED WATER, FIRE LINE AND |
| | SANITARY SEWER TO THE BUILDING FROM CONNECTION POINTS |
| | OF ANY AND ALL EXISTING PIPES. |
| | |
| | 4. EXISTING WATER SERVICE CONNECTIONS/WATER METERS AND |
| | SANITARY SEWER SERVICES SERVING THE PROPERTY, IF NOT |
| | USED, ARE TO BE CUT AND CAPPED AT THE MAIN. |
| | DE-ACTIVATED/INACTIVE PIPELINES LARGER THAN 2-INCH |
| | DIAMETER SHALL BE REMOVED. PLEASE LABEL PIPE SIZE AND |
| | MATERIAL AND ADD NOTES TO THE UTILITY PLANS |
| | ACCORDINGLY. |
| | |
| | 5. SHOW ON THE PLANS ANY EXISTING FIRE HYDRANT CLOSEST |
| | TO THE SITE AND ITS DISTANCE. ALL PROPOSED FIRE |
| | DEPARTMENT CONNECTIONS SHALL BE WITHIN 150 FEET OF A |
| | FIRE HYDRANT AND SHALL BE WITHIN AN EASEMENT WITHIN THE |
| | PROPERTY. |
| | |
| | 6. ON THE LANDSCAPING PLAN, WHEN SUBMITTED IN THE NEXT |
| | REVIEW PHASE, SHOW LOCATIONS OF ALL WATER METERS, |
| | VALVES, CLEAN-OUTS, LIGHT POLES, ETC. ROOT BARRIERS MAY |
| | BE REQUIRED WHERE PLANTINGS ARE NEAR UNDERGROUND |
| | STORMWATER, SANITARY, OR POTABLE WATER LINES. ALSO |
| | CLEARLY INDICATE ALL EXISTING AND PROPOSED EASEMENTS ON |
| | THE LANDSCAPE PLAN; |
| | |
| | 7. PLEASE ALSO SHOW ON THE LANDSCAPE PLAN, WHEN |
| | SUBMITTED IN THE NEXT REVIEW PHASE, THE SIGHT TRIANGLES |
| | FOR THE ALL VEHICULAR EXITS FROM THE SITE. (SECTION |
| | 94-305E, CODE OF ORDINANCES); |
| | |
| | 8. PLEASE SUBMIT ESTIMATES FOR THE SOLID WASTE |
| | COLLECTION YARDAGE AT THIS STAGE. AS PART OF THE FINAL |
| | DESIGN, THIS SOLID WASTE ESTIMATE WILL NEED TO BE |
| | VERIFIED TO VALIDATE APPROPRIATE NUMBER AND SIZE OF |
| | DUMPSTERS/GARBAGE RECEPTACLES. |
| | |
| | 9. FOR SANITATION/GARBAGE COLLECTION CONTACT THE CITY'S |
| | PUBLIC WORKS DEPARTMENT. SUBMIT A LETTER OF APPROVAL |
| | FOR SANITATION PLANS, SIZE OF GARBAGE BINS AND LOCATION |
| | OF THE PROPOSED DUMPSTER ENCLOSURE FROM PETER BIENIEK, |
| | PUBLIC WORKS DIRECTOR PRIOR TO SITE PLAN APPROVAL. |
| | PLEASE INCLUDE THE CITY OF WEST PALM BEACH STANDARD |
| | DETAIL FOR THE DUMPSTER ENCLOSURE ON THE PLANS. MINIMUM |
| | DIMENSIONAL (E.G. THE GATE WIDTH MUST BE A MINIMUM OF |
| | 12.5 FEET) REQUIREMENTS FOR THE ENCLOSURE ARE LISTED IN |
| | CODE OF ORDINANCES, SECTION 94-444(B) OF THE CODE OF |
| | ORDINANCES. CITY STANDARD DETAIL GC-8 MAY BE DOWNLOADED |
| | AT: |
| | |
| | HTTP://WPB.ORG/ENGINEERING/ENGINEERING-SERVICES/ENGINEE |
| | RING-STANDARDS/ |
| | |
| | 10. PROVIDE AN AUTOTURN ANALYSIS DEMONSTRATING THE |
| | SOLID WASTE COLLECTION VEHICLE CAN ACCESS AND MANEUVER |
| | WITHIN THE SITE/PROPOSED DEVELOPMENT. |
| | |
| | 11. A 5-FEET WIDE UTILITY EASEMENT WILL BE REQUIRED |
| | ALONG THE SOUTH PROPERTY LINE. |
| | |
| | AFTER THE SITE PLAN IS APPROVED, IN THE NEXT PHASE, THE |
| | FOLLOWING GENERAL COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL: |
| | |
| | 12. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION |
| | WILL BE REQUIRED FROM THE ENGINEERING SERVICES |
| | DEPARTMENT. THE ENGINEERING DEVELOPMENT APPROVAL |
| | APPLICATION FORMS CAN BE DOWNLOADED FROM THE FOLLOWING |
| | WEBSITE LINK: |
| | |
| | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR |
| | MS,-PERMITS-APPLICATIONS |
| | |
| | 13. PLEASE SUBMIT THE LATEST VERSION OF THE 'AUTO-CALC |
| | CERTIFIED COST ESTIMATE FORM' FOR SUBMISSION TO CITY OF |
| | WEST PALM BEACH PUBLIC WORKS DEPARTMENT FOR ADDITIONAL |
| | WORK PROPOSED. THIS FORM CAN BE DOWNLOADED FROM THE |
| | FOLLOWING LINK: |
| | |
| | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR |
| | MS,-PERMITS-APPLICATIONS |
| | |
| | 14. PAVEMENT RESTORATION WILL BE REQUIRED AND SHALL BE |
| | PER THE CITY STANDARD DETAILS (GC-9 AND P-4) IF ANY |
| | PROPOSED WATER AND SANITARY SEWER CONNECTION WORK IS |
| | PERFORMED WITHIN THE RIGHT-OF-WAY; |
| | |
| | 15. FIRE HYDRANT FLOW TEST DATA FROM EXISTING FIRE |
| | HYDRANT WILL BE REQUIRED PART OF THE PLAN SUBMITTAL; |
| | |
| | 16. ANY WATERLINE THAT HAS NOT BEEN USED FOR A WHILE |
| | SHALL REQUIRE BAC-T TESTING PRIOR TO CONNECTION FOR NEW |
| | SERVICE; |
| | |
| | 17. IN THE FINAL WATER AND SEWER PLANS, INCLUDE A NOTE |
| | THAT: AS OF DECEMBER 20, 2015 THE CITY OF WEST PALM |
| | BEACH CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, |
| | MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD |
| | FREE." FOR MORE INFORMATION REFER TO THE LINK BELOW: |
| | |
| | HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI |
| | CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL |
| | |
| | 18. SUBMITTAL OF 'RIGHT-OF-WAY' PERMIT AND MAINTENANCE |
| | OF TRAFFIC (MOT) PLANS WILL BE REQUIRED FOR WORK WITHIN |
| | THE RIGHT-OF-WAY PRIOR TO PRE-CONSTRUCTION MEETING. |
| | |
| | MOSTAQUE KHAN, P.E. |
| | LAND DEVELOPMENT ENGINEER |
| | [email protected] |
| | 561-494-1124 (OFFICE) |
| | |