Plan Review Details - Project Z17020040
| Plan Review Stops For Project Z17020040 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
03-08-2017 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
03-08-2017 |
Time |
11:21 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
05-01-2017 |
Time |
16:26 |
Sent To |
|
|
| Notes |
| 2017-03-08 11:56:11 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR PERMITTING. | | | | | | 2. SITE DATA, SHEET A0.01, AND BUILDING AREAS, SHEET | | | A0.06, BOTH STATE THAT 716 PARKING SPACES WILL BE | | | PROVIDED. 2% OF THOSE ARE REQUIRED TO BE ACCESSIBLE, | | | SO14.32 ACCESSIBLE SPACES ARE REQUIRED, WHICH MUST BE | | | ROUNDED UP TO 15 ACCESSIBLE PARKING SPACES, BUT ONLY 14 | | | ACCESSIBLE SPACES ARE PROPOSED. THE MINIMUM NUMBER OF | | | ACCESSIBLE PARKING SPACES PROVIDED SHALL BE IN | | | ACCORDANCE WITH SECTION 208.2 OF FLORIDA ACCESSIBILITY | | | CODE. | | | | | | 3. NO VAN ACCESSIBLE PARKING SPACES ARE SHOW AT THIS | | | STAGE. WHEN SUBMITTED FOR PERMITTING THE PLANS SHALL | | | SHOW THREE VAN ACCESSIBLE PARKING SPACES. PER SECTION | | | 208.2.4 OF FLORIDA ACCESSIBILITY CODE, ONE IN EVERY SIX | | | ACCESSIBLE SPACES (AT LEAST ONE) IN A PARKING | | | STRUCTURE, SHALL BE ?VAN ACCESSIBLE? AND DESIGNED IN | | | ACCORDANCE WITH SECTION OF 502 OF FLORIDA ACCESSIBILITY | | | CODE (VERTICAL CLEARANCE NOT LESS THAN 98 INCHES AT | | | SPACE AND VEHICULAR ACCESS ROUTE). | | | | | | 4. WHEN SUBMITTED FOR BUILDING PERMIT, THE PLANS SHALL | | | SHOW THAT THE TYPE OF CONSTRUCTION FOR THE BUILDINGS | | | WILL BE IN ACCORDANCE WITH THE HEIGHT, AREA AND | | | OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE FLORIDA | | | BUILDING CODE | | | | | | 5. WHEN SUBMITTED FOR BUILDING PERMIT, COMPLIANCE WITH | | | ALL BUILDING SEPARATION, PERCENTAGE OF OPENINGS AND | | | OPENING PROTECTIVE REQUIREMENTS OF CHAPTERS 6 AND 7 OF | | | THE FLORIDA BUILDING CODE SHALL BE VERIFIED. | | | | | | 6. LEVEL 1 PLAN, SHEET A1.01, SHOWS STAIR 8 DISCHARGING | | | THROUGH THE CAFE WHILE LEVEL 7 PLAN, SHEET A1.07, SHOWS | | | THE HOTEL BALLROOM, PRE-FUNCTION ROOMS, BOARDROOM, AND | | | OTHER MEETING ROOMS, USING STAIR 8 AS AN EXIT. AT LEAST | | | 50% OF THE REQUIRED EXIT WIDTH FROM THE ASSEMBLY | | | OCCUPANCY SHALL DISCHARGE TO THE OUTSIDE OF THE | | | BUILDING. THE EXIT SHALL NOT DISCHARGE THROUGH THE | | | CAFE. | | | | | | 7. ENCLOSED PARKING GARAGES. IT IS NOTED THAT A GREEN | | | SCREEN WALL IS PROPOSED FOR THE PARKING GARAGE. IF THE | | | PARKING GARAGE DOES NOT HAVE SUFFICIENT WALL OPENINGS | | | TO MEET THE DEFINITION OF AN OPEN PARKING GARAGE, IT | | | WILL BE CONSIDERED AN ENCLOSED PARKING GARAGE AND MUST | | | HAVE EXHAUST SYSTEMS. THE EXHAUST SYSTEMS SHALL BE | | | DESIGNED TO MINIMIZE NOISE LEVELS USING INLINE FAN | | | SILENCERS OR OTHER APPROVED METHODS. | | | | | | 8. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS, | | | GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND | | | OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS, | | | SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC. | | | | | | 9. EACH SEPARATE BUILDING SHALL HAVE A SEPARATE | | | ADDRESS. FOR STREET ADDRESSING, CONTACT MICHAEL ORIO, | | | GIS SUPPORT SPECIALIST, AT (561) 494 1080, OR BY EMAIL: | | | [email protected] | | | | | | 10.THIS PROJECT WILL BE SUBJECT TO ART IN PUBLIC PLACES | | | (AIPP) ASSESSMENT. FOR ADVICE ON THE PROVISION OF | | | PUBLIC ARTWORK IN LIEU OF THE AIPP ASSESSMENT, CONTACT | | | SYBILLE WELTER, ART IN PUBLIC PLACES COORDINATOR, AT | | | (561) 822-1521, OR BY EMAIL: [email protected] | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
mkhan |
Date |
|
Time |
08:23 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
|
Time |
11:20 |
Sent To |
|
|
| Notes |
| 2017-03-08 08:22:19 | REVIEW STOP OPENED IN ERROR, PLEASE SEE 2ND REVIEW STOP | | | FOR BUILDING (STRUCTURAL) REVIEW. | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
4 |
Status |
P |
Date |
02-14-2019 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
04-09-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
02-14-2019 |
Time |
|
Sent To |
|
|
| Notes |
| 2019-04-09 15:14:59 | PASSED WITH PROVISO: IT IS UNDERSTOOD THAT FINAL PLANS | | | SHALL INCLUDE TOTAL REPLACEMENT OF WATER MAIN ON 5TH | | | STREET TO SERVE THE PROJECT. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | | | | RICK ROSSANO | | | PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1098 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 246-9525 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | MANNY GONZALEZ | | | SENIOR ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 644-7301 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | CENTRAL OPERATIONS CENTER (DISPATCH): | | | 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC | | | UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210 | | | | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
3 |
Status |
F |
Date |
01-31-2019 |
|
|
Cont ID |
|
| Sent By |
RRossano |
Date |
01-31-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
01-31-2019 |
Time |
|
Sent To |
|
|
| Notes |
| 2019-01-31 12:38:17 | SOME PREVIOUS COMMENTS FROM 4/13/17 HAVE NOT BEEN | | | ADDRESSED; PLEASE ADDRESS ALL COMMENTS WITH WRITTEN | | | RESPONSES TO BE PROVIDED WITH RESUBMITTAL. | | | | | | FOR ENGINEERING SUBMITTAL, UPDATE ALL CITY OF WEST PALM | | | BEACH STANDARD DETAILS TO MOST CURRENT VERSIONS, WHICH | | | CAN BE FOUND HERE: HTTP://WPB.ORG/DEPARTMENTS/ENGINEERI | | | NG-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS | | | | | | THE FOLLOWING COMMENTS ARE INCLUDED FOR YOUR GENERAL | | | INFORMATION AND USE FOR THE ENGINEERING SUBMITTAL. | | | | | | THE CITY OF WEST PALM BEACH HAS A NUMBER OF REGULATIONS | | | AND PERMIT REQUIREMENTS WHICH DIRECTLY AFFECT THE | | | DEVELOPMENT AND INSTALLATION OF WATER AND WASTEWATER | | | UTILITIES WITHIN THE CITY. PLEASE SEE DEVELOPMENT | | | PERMIT SUBMITTAL REQUIREMENTS AT THE LINK BELOW: | | | HTTP://WPB.ORG/CMSPAGES/GETAMAZONFILE.ASPX?PATH=~\WPB_W | | | EBSITE\MEDIA\ENGINEERING\DEVELOPMENT-APPLICATION-FULL-P | | | ACKAGE_2016.PDF&HASH=7BD4DD7EB6115181D8C5977BCC02A97B19 | | | 60045731D3658206F27451722716EF | | | | | | THIS AND OTHER RELATED ENGINEERING DOCUMENTS CAN BE | | | FOUND HERE: | | | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR | | | MS,-PERMITS-APPLICATIONS | | | | | | CODE OF ORDINANCES, CITY OF WEST PALM BEACH, FLORIDA, | | | CODIFIED THROUGH ORD. NO. 4183-08, ADOPTED SEPT. 22, | | | 2008. (SUPPLEMENT NO. 18) | | | | | | CHAPTER 90 UTILITIES, ARTICLE I. IN GENERAL, | | | SEC. 90-7. POLICY REGARDING EXTENSION OF WATER OR SEWER | | | SERVICE FACILITIES OF THE CITY. | | | | | | THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE | | | CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY | | | BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS, | | | BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION. | | | | | | PROVIDE CALCULATIONS OF EXISTING AND PROPOSED DEMANDS | | | FOR WATER & SEWER (AVERAGE, MAXIMUM AND PEAK) AND FIRE | | | FLOW DEMANDS. CALCULATIONS SHALL BE PER FAC 64E-6 FOR | | | SEWER AND PER FAC 64-E.008 FOR WATER. | | | | | | PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER ALONG | | | ENTIRE PROJECT FRONTAGE. | | | | | | PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY OF | | | WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC RIGHT | | | OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF YOUR | | | PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE | | | MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL | | | IN THE WPB ENGINEERING SERVICES DEPARTMENT AT | | | [email protected] OR 561-494-1079 FOR FURTHER | | | ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION | | | ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD | | | SURVEY, POT-HOLING, SOFT DIGS ETC. | | | | | | AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH | | | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, | | | STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR | | | MORE INFORMATION, REFER TO THE LINK BELOW: | | | HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI | | | CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL | | | | | | PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS OF | | | ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES, | | | INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND | | | SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES, | | | METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE | | | SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING | | | GRADES, PIPES SIZES, MATERIALS, ELEVATIONS, | | | ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL | | | INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER | | | LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE | | | PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN | | | VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. | | | ADDITIONALLY, PLAN VIEW SHALL SHOW ALL EXISTING AND | | | PROPOSED UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER | | | OPTIC, ELECTRIC, GAS, AND CABLEVISION & | | | TELECOMMUNICATION FACILITIES LOCATED ON THE | | | RIGHT-OF-WAY. | | | | | | PROVIDE PROFILE VIEW OF ALL UTILITY CONFLICTS WITHIN | | | CITY OF WPB RIGHT OF WAY. | | | | | | CUT AND CAP ANY UTILITIES NOT BEING USED. | | | | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
F |
Date |
04-17-2017 |
|
|
Cont ID |
|
| Sent By |
mkhan |
Date |
04-17-2017 |
Time |
14:27 |
Rev Time |
0.00 |
| Received By |
mkhan |
Date |
04-17-2017 |
Time |
14:27 |
Sent To |
|
|
| Notes |
| 2017-04-17 14:28:59 | CITY OF WEST PALM BEACH | | | PUBLIC WORKS DEPARTMENT | | | ENGINEERING DIVISION | | | | | | DATE: 04/17/2017 | | | | | | PROJECT NAME: ONE WEST PALM - 550 N. QUADRILLE BLVD. - | | | Z17020040 | | | | | | 2ND/RE-SUBMITTAL REVIEW RESPONSE | | | | | | STATUS: FAILED | | | | | | AFTER REVIEWING THE REVISED PLANS RECEIVED AT MY DESK | | | ON APRIL 13, 2017, IT APPEARS THAT SOME OF THE COMMENTS | | | HAVE BEEN ADDRESSED AND OTHERS ARE ACKNOWLEDGED AS: | | | 'COMMENT NOTED' AND DEEM SATISFIED. THE ACKNOWLEDGED | | | COMMENTS ARE EXPECTED TO BE ADDRESSED DURING | | | 'ENGINEERING DEVELOPMENT APPLICATION' PHASE PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | FOLLOWING COMMENTS ARE STILL NOT SATISFIED AND NEED TO | | | BE ADDRESSED AT THIS LEVEL PRIOR TO SITE PLAN APPROVAL: | | | | | | 1. IN THE REGARDS TO SANITATION PLAN I.E. TRASH/GARBAGE | | | COLLECTION BY A PRIVATE PROVIDER FOR THE PROPOSED | | | DEVELOPMENT, PLEASE SUBMIT A WRITTEN LETTER OF APPROVAL | | | FROM THE PUBLIC WORKS DIRECTOR, PETER BIENIEK; | | | | | | 4. LOCATION OF WATER METER SHALL NOT BE INSIDE BUILDING | | | ENCLOSURE AND NEED TO BE ACCESSIBLE. PLEASE SHOW IN THE | | | PLANS ACCORDINGLY; | | | | | | 7. ?SHEET 2 ? SITE DEMOLITION PLAN? SHOWING EXISTING | | | WATER METER, WATER SERVICE AND SANITARY SEWER SERVICES | | | ON 4TH ST. ARE TO BE REMOVED AND PLUGGED AT THE | | | RIGHT-OF-WAY LINE. EXISTING WATER AND SEWER SERVICES, | | | IF NOT SERVING THE PROPERTY, HAVE TO BE CUT AND CAPPED | | | AT THE MAIN. DE-ACTIVATED/INACTIVE PIPELINES LARGER | | | THAN 2" DIAMETER WILL BE REMOVED. PLEASE CORRECT LABELS | | | ON THIS SHEET ACCORDINGLY; | | | | | | ** ALL TRAFFIC/TRANSPORTATION RELATED COMMENTS | | | PREVIOUSLY OFFERED NEED TO BE ADDRESSED PRIOR TO 'SITE | | | PLAN' APPROVAL ALSO. PLEASE CONTACT ERIK FERGUSON AT: | | | (561) 494-1092 TO DISCUSS TRAFFIC/TRANSPORTATION | | | RELATED MATTERS. | | | | | | MOSTAQUE KHAN, P.E. | | | LAND DEVELOPMENT ENGINEER | | | [email protected] | | | 561-494-1124 (OFFICE) | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
03-06-2017 |
|
|
Cont ID |
|
| Sent By |
mkhan |
Date |
03-06-2017 |
Time |
17:25 |
Rev Time |
0.00 |
| Received By |
mkhan |
Date |
03-06-2017 |
Time |
17:23 |
Sent To |
|
|
| Notes |
| 2017-03-07 17:22:35 | CITY OF WEST PALM BEACH | | | PUBLIC WORKS DEPARTMENT | | | ENGINEERING DIVISION | | | | | | DATE: 03/07/2017 | | | | | | Z17020040: 550 N. QUADRILLE BLVD - ONE WEST PALM | | | DEVELOPMENT | | | | | | THIS IS A RESUBMITTAL HENCE ALL PREVIOUS CONDITIONS OF | | | APPROVAL STILL APPLY. ANY AND ALL PREVIOUS COMMENTS | | | THOSE HAVE NOT BEEN SATISFIED WILL NEED TO BE ADDRESSED | | | DURING THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION | | | PROCESSES. | | | | | | THE FOLLOWING NEW COMMENTS ARE MADE ON THE RECENTLY | | | SUBMITTED PLANS AND MUST BE ADDRESSED PRIOR TO ISSUANCE | | | OF CONSTRUCTION AUTHORIZATION INCLUDING BUILDING | | | PERMITS AND ENGINEERING DEVELOPMENT APPROVAL: | | | | | | FOLLOWING IS GENERAL SITE COMMENT: | | | | | | 1. FOR SANITATION/GARBAGE COLLECTION CONTACT THE CITY'S | | | PUBLIC WORKS DEPARTMENT. FINAL APPROVED SITE PLANS NEED | | | TO SHOW PROPOSED SANITATION COLLECTION PLANS AND | | | DETAILS; AND WILL NEED APPROVAL FROM PETER BIENIEK, | | | PUBLIC WORKS DIRECTOR. PLEASE INCLUDE THE CITY OF WEST | | | PALM BEACH STANDARD DETAIL FOR THE DUMPSTER ENCLOSURE | | | ON THE PLANS. MINIMUM DIMENSIONAL (E.G. THE GATE WIDTH | | | MUST BE A MINIMUM OF 12.5 FEET) REQUIREMENTS FOR THE | | | ENCLOSURE ARE LISTED IN CODE OF ORDINANCES, SECTION | | | 94-444(B) OF THE CODE OF ORDINANCES. CITY STANDARD | | | DETAIL GC-8 MAY BE DOWNLOADED AT: | | | | | | HTTP://WPB.ORG/ENGINEERING/ENGINEERING-SERVICES/ENGINEE | | | RING-STANDARDS/ | | | | | | FOLLOWING ARE WATER AND SEWER COMMENTS AND NEED TO BE | | | ADDRESSED PRIOR TO ENGINEERING DEPARTMENT APPROVAL: | | | | | | 2. A FIRE HYDRANT FLOW TEST DATA FROM EXISTING FIRE | | | HYDRANT WILL BE REQUIRED PART OF THE PLAN SUBMITTAL; | | | | | | 3. PLEASE INCLUDE THE LATEST VERSION OF THE APPLICABLE | | | CITY OF WEST PALM BEACH STANDARD UTILITY DETAILS TO THE | | | DETAILS SHEET DURING SUBMISSION OF THE FINAL | | | ENGINEERING PLANS. CONTACT THE ENGINEERING SERVICES | | | DEPARTMENT FOR THE LATEST REVISED DETAILS IN CAD | | | FORMAT. CITY?S STANDARD DETAILS (IN PDF FILE FORMAT) | | | CAN BE DOWNLOADED FROM THE FOLLOWING SITE: | | | | | | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR | | | MS,-PERMITS-APPLICATIONS | | | | | | 4. PLACEMENT OF THE PROPOSED METER, BACKFLOW PREVENTER, | | | DCDA ETC. SHALL BE INSTALLED PER THE CITY'S STANDARD | | | DETAILS. THEY SHALL NOT BE INSIDE THE BUILDING | | | ENCLOSURE. WATER METER SHOULD BE WITHIN THE | | | RIGHT-OF-WAY OR INSIDE AN 'UTILITY EASEMENT' JUST | | | INSIDE THE PROPERTY NEAR THE RIGHT-OF-WAY AND | | | ACCESSIBLE; | | | | | | 5. IN THE FINAL PLANS, SHOW CONFLICT INFORMATION | | | (BOTTOM AND TOP OF CROSSING PIPES) AT THE CONFLICT | | | POINTS OF ALL WATER, STORM AND SANITARY SEWER PIPES AS | | | WELL AS OTHER FRANCHISE UTILITIES. EXISTING UTILITIES | | | WITHIN THE PROPOSED SANITARY SEWER LATERAL ARE TO BE | | | VERIFIED VIA SOFTDIGS AND PROVIDE ALL UTILITY CROSSING | | | INFORMATION; | | | | | | 6. CCTV RECORD (VIDEO AND TV LOG) OF THE EXISTING | | | SANITARY SEWER (FULL LENGTH FROM MH TO MH) ON NORTH | | | DIXIE HWY. AND NEW SANITARY SEWER LATERAL WILL BE | | | REQUIRED AS PART OF THE PROJECT CLOSE-OUT SUBMITTALS; | | | | | | 7. EXISTING WATER SERVICE CONNECTIONS/WATER METERS | | | SERVING THE PROPERTY, IF NOT USED, ARE TO BE CUT AND | | | CAPPED AT THE MAIN. DE-ACTIVATED/INACTIVE PIPELINES | | | LARGER THAN 2" DIAMETER WILL BE REMOVED. PLEASE LABEL | | | PIPE SIZE AND MATERIAL AND ADD NOTES TO THE UTILITY | | | PLANS ACCORDINGLY; | | | | | | 8. EXISTING SEWER SERVICE CONNECTIONS SERVING THE | | | PROPERTY, IF NOT USED, ARE TO BE CUT AND CAPPED AT THE | | | MAIN; | | | | | | 9. SHOW SIZE AND MATERIAL OF THE PROPOSED SANITARY | | | SEWER SERVICE. INCLUDE A PROFILE FOR THE PROPOSED | | | SERVICE LATERAL WITH GROUND ELEVATIONS ABOVE THE PIPE; | | | | | | 10. EXISTING SANITARY SEWER MH TO BE REHABBED PER | | | CITY'S REQUIREMENTS WHILE CONNECTING NEW SERVICE LINES; | | | | | | 11. FOR THE FINAL UTILITY PLANS, INCLUDE A NOTE THAT: | | | AS OF DECEMBER 20, 2015 THE CITY OF WEST PALM BEACH | | | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, | | | MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD | | | FREE." FOR MORE INFORMATION REFER TO THE LINK BELOW: | | | | | | HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI | | | CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL | | | | | | 12. ALL PROPOSED FIRE DEPARTMENT CONNECTIONS SHALL BE | | | WITHIN 150 FEET OF A FIRE HYDRANT AND SHALL BE WITHIN | | | AN EASEMENT WITHIN THE PROPERTY. LANDSCAPE PLAN SHALL | | | SHOW LOCATIONS OF ALL WATER METERS, VALVES, CLEAN-OUTS, | | | LIGHT POLES, ETC. ROOT BARRIERS MAY BE REQUIRED WHERE | | | PLANTINGS ARE NEAR UNDERGROUND STORMWATER, SANITARY, OR | | | POTABLE WATER LINES. | | | | | | 13. SUBMITTAL OF MAINTENANCE OF TRAFFIC (MOT) FOR WORK | | | WITHIN THE RIGHT-OF-WAY WILL BE REQUIRED AT THE | | | PRE-CONSTRUCTION MEETING. | | | | | | MOSTAQUE KHAN, P.E. | | | LAND DEVELOPMENT ENGINEER | | | [email protected] | | | 561-494-1124 (OFFICE) | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
03-07-2017 |
|
|
Cont ID |
|
| Sent By |
wjolin |
Date |
03-07-2017 |
Time |
16:54 |
Rev Time |
0.00 |
| Received By |
wjolin |
Date |
03-07-2017 |
Time |
15:50 |
Sent To |
|
|
| Notes |
| 2017-03-07 16:04:51 | CIVIL: | | | PROVIDE A MINIMUM OF TWO REMOTELY LOCATED FIRE | | | DEPARTMENT CONNECTIONS PER NFPA 14. | | | | | | PER NFPA 24 SECTION 6.2.1, ALL CONNECTIONS TO PRIVATE | | | FIRE SERVICE MAINS FOR FIRE PROTECTION SYSTEMS SHALL BE | | | ARRANGED IN ACCORDANCE WITH ONE OF THE FOLLOWING SO | | | THAT THEY CAN BE ISOLATED: | | | (1)A POST INDICATOR VALVE INSTALLED NOT LESS THAN 40 | | | FEET FROM THE BUILDING. | | | (A) FOR BUILDINGS LESS THAN 40 FEET IN HEIGHT, A POST | | | INDICATOR VALVE SHALL BE PERMITTED TO BE INSTALLED | | | CLOSER THAN 40 FEET BUT AT LEAST AS FAR FROM THE | | | BUILDING AS THE HEIGHT OF THE WALL FACING THE POST | | | INDICATOR VALVE. | | | (2) A WALL POST INDICATOR VALVE | | | (3) AN INDICATING VALVE IN A PIT, INSTALLED IN | | | ACCORDANCE WITH SECTION 6.4 | | | (4) A BACKFLOW PREVENTER WITH AT LEAST ONE INDICATING | | | VALVE NOT LESS THAN 40 FEET FROM THE BUILDING. | | | (A) FOR BUILDINGS LESS THAN 40 FEET IN HEIGHT, A | | | BACKFLOW PREVENTER WITH AT LEAST ONE INDICATING VALVE | | | SHALL BE PERMITTED TO BE INSTALLED CLOSER THAN 40 FEET | | | BUT AT LEAST AS FAR FROM THE BUILDING AS THE HEIGHT OF | | | THE WALL FACING THE BACKFLOW PREVENTER. | | | (5) CONTROL VALVES INSTALLED IN A FIRE-RATED ROOM | | | ACCESSIBLE FROM THE EXTERIOR | | | (6) CONTROL VALVES IN A FIRE-RATED STAIR ENCLOSURE | | | ACCESSIBLE FROM THE EXTERIOR AS PERMITTED BY THE | | | AUTHORITY HAVING JURISDICTION | | | | | | SITE: | | | THE CITY OF WEST PALM BEACH REQUIRES CONSTRUCTION | | | TRAILERS LARGER THAN A SINGLE "DOUBLE WIDE" (OR TWO | | | "SINGLE WIDE") TO EITHER BE PROTECTED BY AN AUTOMATIC | | | SPRINKLER SYSTEM OR COMPLY WITH THE SEPARATION | | | REQUIREMENTS OF NFPA 241. TEMPORARY CONSTRUCTION | | | TRAILERS OR MODULAR BUILDINGS WILL REQUIRE A PERMIT AND | | | COMPLIANCE WITH THE FOLLOWING: | | | PER NFPA 241- STANDARD FOR SAFEGUARDING CONSTRUCTION, | | | ALTERATION, AND DEMOLITION OPERATIONS, SECTION 4.2: | | | TEMPORARY OFFICES, TRAILERS, AND OTHER FACILITIES OF | | | COMBUSTIBLE CONSTRUCTION OR HOUSING COMBUSTIBLE | | | CONTENTS SHALL BE SEPARATED FROM ADJACENT BUILDINGS, | | | TRAILERS OR STRUCTURES IN ACCORDANCE WITH TABLE 4.2.1. | | | PER TABLE 4.2.1: | | | 1) 20 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM | | | ADJACENT STRUCTURES BY AT LEAST 30 FEET | | | 2) 30 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM | | | ADJACENT STRUCTURES BY AT LEAST 35 FEET | | | 3) 40 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM | | | ADJACENT STRUCTURES BY AT LEAST 40 FEET | | | 4) 50 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM | | | ADJACENT STRUCTURES BY AT LEAST 45 FEET | | | 5) 60 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM | | | ADJACENT STRUCTURES BY AT LEAST 50 FEET | | | 6) GREATER THAN 60 FEET EXPOSED LENGTH SHALL BE | | | SEPARATED FROM ADJACENT STRUCTURES BY AT LEAST 60 FEET | | | **A 75 PERCENT REDUCTION IN SEPARATION DISTANCES SHALL | | | BE PERMITTED TO BE APPLIED, PROVIDED AUTOMATIC | | | SPRINKLER PROTECTION IS USED IN THE EXPOSING STRUCTURE. | | | | | | PER NFPA 241 SECTION 4.2.2: DETACHMENT BETWEEN | | | TEMPORARY STRUCTURES, ADEQUATE TEMPORARY FIXED FIRE | | | PROTECTION SYSTEMS, AND PORTABLE EQUIPMENT SHALL BE | | | PROVIDED AS REQUIRED BY THE AUTHORITY HAVING | | | JURISDICTION. | | | | | | BUILDING: | | | THE BUILDING IS FUNCTIONING AS A MULTIUSE OCCUPANCY. | | | INDICATE IF THE BUILDING IS DESIGNED FOR MIXED USE | | | (NON-SEPARATED) OR SEPARATED USE PER SECTION 6.1.14.2.1 | | | OF NFPA 101 FLORIDA EDITION 2009. FOR NON-SEPARATED | | | MIXED USE OCCUPANCIES, THE MOST STRINGENT FIRE AND LIFE | | | SAFETY REQUIREMENTS OF EACH OCCUPANCY SHALL APPLY TO | | | THE BUILDING. | | | | | | NO LIFE SAFETY PLANS SUBMITTED. A THOROUGH AND COMPLETE | | | PLAN REVIEW CANNOT BE COMPLETED AT THIS TIME DUE TO | | | LACK OF INFORMATION SUBMITTED ON THE PLANS. ADDITIONAL | | | PLAN REVIEW COMMENTS MAY BE GENERATED DURING PLAN | | | RESUBMISSION. | | | | | | PER FFPC SECTION 11.9.4 AND FBC SECTION 911.1.5 - THE | | | FIRE COMMAND CENTER SHALL COMPLY WITH NFPA 72 AND SHALL | | | CONTAIN THE FOLLOWING FEATURES: | | | 1. THE EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM | | | CONTROL UNIT. | | | 2. THE FIRE DEPARTMENT COMMUNICATIONS SYSTEM. | | | 3. FIRE DETECTION AND ALARM SYSTEM ANNUNCIATOR. | | | 4. ANNUNCIATOR UNIT VISUALLY INDICATING THE LOCATION OF | | | THE ELEVATORS AND WHETHER THEY ARE OPERATIONAL. | | | 5. STATUS INDICATORS AND CONTROLS FOR AIR DISTRIBUTION | | | SYSTEMS. | | | 6. THE FIRE-FIGHTER?S CONTROL PANEL REQUIRED BY SECTION | | | 909.16 FOR SMOKE CONTROL SYSTEMS INSTALLED IN THE | | | BUILDING. | | | 7. CONTROLS FOR UNLOCKING STAIRWAY DOORS | | | SIMULTANEOUSLY. | | | 8. SPRINKLER VALVE AND WATERFLOW DETECTOR DISPLAY | | | PANELS. | | | 9. EMERGENCY AND STANDBY POWER STATUS INDICATORS. | | | 10. A TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED | | | ACCESS TO THE PUBLIC TELEPHONE SYSTEM. | | | 11. FIRE PUMP STATUS INDICATORS. | | | 12. SCHEMATIC BUILDING PLANS INDICATING THE TYPICAL | | | FLOOR PLAN AND DETAILING THE BUILDING CORE, MEANS OF | | | EGRESS, FIRE PROTECTION SYSTEMS, FIRE-FIGHTING | | | EQUIPMENT AND FIRE DEPARTMENT ACCESS AND THE LOCATION | | | OF FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE | | | BARRIERS AND SMOKE PARTITIONS. | | | 13. WORK TABLE. | | | 14. GENERATOR SUPERVISION DEVICES, MANUAL START AND | | | TRANSFER FEATURES. | | | 15. PUBLIC ADDRESS SYSTEM, WHERE SPECIFICALLY REQUIRED | | | BY OTHER SECTIONS OF THIS CODE. | | | 16. ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME | | | A17.1. | | | 17. ELEVATOR EMERGENCY OR STANDBY POWER SELECTOR | | | SWITCH(ES), WHERE EMERGENCY OR STANDBY POWER IS | | | PROVIDED. | | | | | | LARGE FLOOR OPENING CREATED BETWEEN LEVELS 7 AND 8. | | | INDICATE IF THIS IS INTENDED TO BE A CONVENIENCE | | | OPENING, ATRIUM, OR COMMUNICATING SPACE PER NFPA 101. | | | | | | | | | | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
9 |
Status |
P |
Date |
11-10-2020 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
11-10-2020 |
Time |
11:37 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
11-10-2020 |
Time |
11:37 |
Sent To |
|
|
| Notes |
| 2020-11-10 11:38:57 | RECEIVED ADDITIONAL INFORMATION REQUESTED ON GREEN | | | WALL. INSTALLATION AND MAINTENANCE GUIDELINES WILL BE | | | INCLUDED IN APPROVAL DOCUMENTS. |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
8 |
Status |
P |
Date |
10-07-2020 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
10-07-2020 |
Time |
15:26 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
10-07-2020 |
Time |
15:26 |
Sent To |
|
|
| Notes |
| 2020-10-07 15:27:12 | SEE ZONING COMMENTS FOR CONDITION REGARDING FDOT MEDIAN | | | LANDSCAPING. |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
7 |
Status |
P |
Date |
03-04-2020 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
03-04-2020 |
Time |
14:48 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
03-04-2020 |
Time |
14:48 |
Sent To |
|
|
| Notes |
| 2020-03-04 14:49:32 | ALL COMMENTS PREVIOUSLY SATISFIED, NO CHANGES |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
6 |
Status |
P |
Date |
08-26-2019 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
08-26-2019 |
Time |
15:29 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
08-26-2019 |
Time |
15:29 |
Sent To |
|
|
| Notes |
| 2019-08-26 15:30:07 | FROM: RAY CARANCI, LANDSCAPE PLANNER | | | PROJECT: 550 QUADRILLE Z17020040 | | | AUGUST 26, 2019 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. SATISFIED. PLEASE REFER TO THE PREVIOUSLY APPROVED | | | PLAN FOR REFERENCE ON THE TREE DISPOSITION, MITIGATION | | | AND OPEN SPACE REQUIREMENTS. | | | THE QUALITY OF THE PLANTINGS USING THE SABAL PALMS | | | APPEARS TO BE A DOWNGRADE FROM THE APPROVED PLAN. THE | | | SABAL PALMS DO NOT HAVE TO BE USED ON SITE, THEY CAN BE | | | RELOCATED TO ANOTHER LOCATION WITHIN THE CITY, | | | INCLUDING PUBLIC SPACES. | | | THE QUANTITY AND QUALITY OF THE LANDSCAPING IS REDUCED | | | FOR THE PROPOSED LANDSCAPE PLAN. STAFF REQUESTS THAT | | | QUANTITIES OF STREET TREES BE MAINTAINED AS APPROVED, | | | AND PUBLIC OPEN SPACE AREAS PROVIDE COMPARABLE TREE | | | CANOPY AREA AS THE APPROVED PLAN. | | | STAFF IS AVAILABLE TO REVIEW THE PLANS WITH THE | | | LANDSCAPE ARCHITECT TO DISCUSS THESE COMMENTS AND | | | CLARIFY WHAT IS REQUESTED. | | | | | | | | | | | | 2. SATISFIED. PLEASE PROVIDE A DIAGRAM AND CALCULATIONS | | | TO SHOW THE OPEN SPACE AREAS BY CATEGORY, AND | | | PERCENTAGE OF VEGETATED AREA AND TREE CANOPY TO MEET | | | THE REQUIREMENTS OF SECTION 94-109 TABLE IV-7. | | | EACH OPEN SPACE AREA NEEDS TO BE DEFINED. TREE CANOPY | | | FROM AREAS OUTSIDE THE DESIGNATED OPEN SPACE AREA | | | CANNOT BE COUNTED. ALL TREE CANOPY CREDITS FOR OPEN | | | SPACE REQUIREMENTS CAN BE FOUND IN TABLE IV-8. | | | | | | THE LIMITS OF THE PUBLIC OPEN SPACE AREA ARE SHOWN | | | BEYOND THE FUNCTIONAL QUALIFYING SPACE. (SEE APPROVED | | | PLANS). | | | THE PRIVATE OPEN SPACE AREAS AND CALCULATIONS NEED TO | | | BE SEPARATED BY EACH AREA AND IDENTIFIED BY TYPE, AND | | | EACH HAVE INDIVIDUAL QUALIFYING PERCENTAGES SHOWN. | | | EACH AREA MUST MEET THE CODE REQUIREMENTS ON ITS OWN, | | | NOT COMBINED OR INCLUDING TREE CANOPY FROM OUTSIDE THE | | | AREA. | | | STAFF IS AVAILABLE TO REVIEW THE PLANS WITH THE | | | LANDSCAPE ARCHITECT TO DISCUSS THESE COMMENTS AND | | | CLARIFY WHAT IS REQUESTED. | | | | | | 3. SATISFIED. PLEASE IDENTIFY EACH PUBLIC AND PRIVATE | | | OPEN SPACE AREA BY TYPE ACCORDING TO THE DEFINITIONS | | | FOUND IN SECTION 94-109. | | | THERE ARE THREE OPTIONS FROM TABLE IV-6 FOR QGD10 FOR | | | PUBLIC OPEN SPACE. GARDEN PLAZA, GARDEN COURTYARD OR | | | PASSAGEWAY. IDENTIFY WHAT THE TYPE IS FOR EACH PUBLIC | | | OPEN SPACE AREA. PLAZA IS NOT AN OPTION. | | | | | | 4. SATISFIED. PLEASE SHOW THE CALCULATIONS FOR TREE | | | CANOPY BY SPECIES FOR THE OPEN SPACE CATEGORIES PER | | | SECTION 94-109 TABLE IV-8. | | | TREES AND CANOPY CREDITS MUST BE LISTED AND LABELED FOR | | | EACH INDIVIDUAL SPACE. | | | STAFF IS AVAILABLE TO REVIEW THE PLANS WITH THE | | | LANDSCAPE ARCHITECT TO DISCUSS THESE COMMENTS AND | | | CLARIFY WHAT IS REQUESTED. | | | | | | | | | 5. SATISFIED. PLEASE PROVIDE INFORMATION ON HOW THE | | | TREES PROPOSED TO BE RELOCATED WILL BE STORED DURING | | | CONSTRUCTION. THE LOCATION ON SITE IS NOT FEASIBLE | | | DURING CONSTRUCTION OF THE BUILDING. QUALITY OF THE | | | EXISTING TREES AND PALMS IS NOT GOOD, AND THE | | | SURVIVABILITY MAY BE LOW WITH POTENTIALLY MOVING THEM | | | TWICE. SEE COMMENT 1. | | | | | | 6. SATISFIED. PLEASE PROVIDE A STRUCTURAL SOIL DETAIL | | | AND SHOW THE LOCATIONS OF STRUCTURAL SOIL ON THE | | | LANDSCAPE PLAN. | | | LOCATIONS FOR STRUCTURAL SOIL UNDER SIDEWALKS ADJACENT | | | TO STREET TREES MUST BE SHOWN CLEARLY ON THE LANDSCAPE | | | PLAN. AREAS ARE INCOMPLETE ON S DIXIE SIDE, AND THERE | | | ARE NONE SHOWN ON THE 4TH STREET SIDE. | | | | | | 7. SATISFIED. STREET TREES LOCATED IN A SIDEWALK THAT | | | IS ADJACENT TO A PERVIOUS LANDSCAPE AREA SHALL HAVE THE | | | STRUCTURAL SOIL EXTENDED UNDER THE SIDEWALK TO MEET THE | | | LANDSCAPE AREA IF THE DISTANCE BETWEEN THE 5 FOOT | | | REQUIRED STRUCTURAL SOIL AND THE LANDSCAPE AREA IS LESS | | | THAN 4 FEET. PLEASE SHOW THESE AREAS ON THE LANDSCAPE | | | PLAN. | | | SEE COMMENT #6. | | | | | | 8. SATISFIED. PLEASE SHOW SAFE SIGHT TRIANGLE AT | | | VEHICLE ENTRANCES AND EXITS. THE ENTRANCES NEED TO BE | | | ENGINEERED TO ALLOW ANY TREES AND SHRUBS AND | | | GROUNDCOVER TO BE PLANTED IN ANY LANDSCAPE AREAS | | | LOCATED ADJACENT TO THEM, AND STILL ALLOW SAFE SIGHT | | | TRIANGLES TO BE CLEAR. | | | | | | 9. SATISFIED. PISCIDIA PISCIPULA IS NOT COLD HARDY TO | | | THIS ZONE. PLEASE PROPOSE A MORE APPROPRIATE SPECIES. | | | | | | 10. SATISFIED. STRANGLER FIG IS NOT RECOMMENDED DUE TO | | | WHITEFLY ISSUES IN THIS AREA. PLEASE PROPOSE A MORE | | | APPROPRIATE SPECIES. | | | | | | 11. SATISFIED. QUERCUS VIRGINIANA ?CATHEDRAL? OAKS ARE | | | TO BE USED AS STREET TREES. PLEASE REVISE. | | | PLEASE CORRECT THE PLANT LIST TO READ QUERCUS | | | VIRGINIANA ?CATHEDRAL?. | | | ADDITIONAL COMMENTS 11/16/18: | | | 12. SATISFIED. UPDATE THE FLORIDA FRIENDLY LANDSCAPE | | | CHART TO CURRENT CODE. | | | PLANTS IN EACH CATEGORY CANNOT BE COUNTED TWICE PER THE | | | CODE. IF TAKING 51% OR MORE NATIVE CREDIT, THERE IS | | | ONLY THE DIFFERENCE FROM 100% LEFT TO CLAIM ANOTHER | | | CATEGORY. REVISE. | | | | | | 13. SATISFIED. WATER, SEWER AND FIRE LINE LOCATIONS ARE | | | IN CONFLICT WITH STREET TREES IN SEVERAL LOCATIONS. | | | ADJUST LINE LOCATIONS TO AVOID CONFLICT AND SHOW ROOT | | | BARRIER LOCATIONS. | | | SHOW THE LOCATIONS OF THE UTILITIES ON THE LANDSCAPE | | | PLAN. | | | THE LANDSCAPE PLAN DOES NOT SHOW THE UTILITIES AS SHOWN | | | ON THE CIVIL PLANS, AND CONFLICTS STILL EXIST. | | | | | | 14. SATISFIED. PROVIDE A PLANT LIST OF SHRUB SPECIES | | | AND SIZES. MUST IDENTIFY DROUGHT TOLERANCE LEVELS AND | | | IF NATIVE PLANTS. | | | | | | 15. SATISFIED. UPDATE THE TREE DISPOSITION PLAN TO | | | REFLECT THE SUBMITTAL FOR THE TREE ALTERATION PERMIT. | | | | | | 16. SATISFIED. STREET TREES NEED TO BE SHOWN ON 5TH | | | STREET AND N DIXIE AS APPROVED ADJACENT TO THE PUBLIC | | | OPEN SPACE. | | | STREET TREES (OAKS) ON 5TH ST NEED TO BE LOCATED | | | ADJACENT TO THE CURB. THE PUBLIC OPEN SPACE MAY BE | | | EXPANDED TO THE BACK OF CURB | | | | | | 17. SATISFIED. STREET TREES PROPOSED ALONG QUADRILLE | | | APPEAR TO BE LOCATED IN EASEMENTS THAT WILL NOT ALLOW | | | THEM. THE APPROVED PLAN SHOWS THE TREES OUTSIDE OF THE | | | EASEMENTS AND SHOULD BE FOLLOWED. | | | PROVIDE FPL RELEASE ACCEPTING THE PROPOSED LANDSCAPING | | | IN THEIR EASEMENT. | | | ADDITIONAL COMMENTS 2/21/19: | | | | | | 18. SATISFIED. THE STRUCTURAL SOIL LOCATIONS CONFLICT | | | WITH EXFILTRATION TRENCHES. THESE ARE INCOMPATIBLE, AS | | | ONE IS INTENDED TO PROMOTE TREE ROOT GROWTH, AND THE | | | OTHER IS NOT INTENDED FOR ROOT INTRUSION. EXFILTRATION | | | IS NOT SUSTAINABLE. | | | | | | 19. SATISFIED. A NEW FPL POLE WAS RECENTLY INSTALLED | | | AT THE CORNER OF 4TH ST AND QUADRILLE THAT WILL NOT | | | ALLOW THE LIVE OAKS TO BE PLANTED WITHIN 30 FEET OF THE | | | LINES. INDICATE IF THIS POLE WILL BE REMOVED AND LINES | | | RELOCATED TO ALLOW THE PLANTING OF THE STREET TREES. | | | | | | CONDITIONS OF APPROVAL | | | | | | 1. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE INSTALLATION OF THE STREET TREES | | | AND RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED | | | WITH THIS PETITION. THE APPLICANT SHALL ASSURE THAT ALL | | | EXISTING CITY IRRIGATION IN THE RIGHT OF WAY REMAINS | | | INTACT AND FUNCTIONAL FOR ALL OTHER LOCATIONS, WHILE | | | ALL IRRIGATION TO STREET TREES ADJACENT TO THE PROPERTY | | | WILL BE SERVED BY THE PROJECT IRRIGATION SYSTEM. | | | | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A | | | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
5 |
Status |
P |
Date |
04-30-2019 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
04-19-2019 |
Time |
15:43 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
04-09-2019 |
Time |
15:43 |
Sent To |
|
|
| Notes |
| 2019-04-30 15:50:55 | FROM: RAY CARANCI, LANDSCAPE PLANNER | | | PROJECT: 550 QUADRILLE Z17020040 | | | APRIL 16, 2019 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. CONDITIONALLY SATISFIED. PLEASE REFER TO THE | | | PREVIOUSLY APPROVED PLAN FOR REFERENCE ON THE TREE | | | DISPOSITION, MITIGATION AND OPEN SPACE REQUIREMENTS. | | | THE QUALITY OF THE PLANTINGS USING THE SABAL PALMS | | | APPEARS TO BE A DOWNGRADE FROM THE APPROVED PLAN. THE | | | SABAL PALMS DO NOT HAVE TO BE USED ON SITE, THEY CAN BE | | | RELOCATED TO ANOTHER LOCATION WITHIN THE CITY, | | | INCLUDING PUBLIC SPACES. | | | THE QUANTITY AND QUALITY OF THE LANDSCAPING IS REDUCED | | | FOR THE PROPOSED LANDSCAPE PLAN. STAFF REQUESTS THAT | | | QUANTITIES OF STREET TREES BE MAINTAINED AS APPROVED, | | | AND PUBLIC OPEN SPACE AREAS PROVIDE COMPARABLE TREE | | | CANOPY AREA AS THE APPROVED PLAN. | | | STAFF IS AVAILABLE TO REVIEW THE PLANS WITH THE | | | LANDSCAPE ARCHITECT TO DISCUSS THESE COMMENTS AND | | | CLARIFY WHAT IS REQUESTED. | | | | | | | | | | | | 2. SATISFIED. PLEASE PROVIDE A DIAGRAM AND CALCULATIONS | | | TO SHOW THE OPEN SPACE AREAS BY CATEGORY, AND | | | PERCENTAGE OF VEGETATED AREA AND TREE CANOPY TO MEET | | | THE REQUIREMENTS OF SECTION 94-109 TABLE IV-7. | | | EACH OPEN SPACE AREA NEEDS TO BE DEFINED. TREE CANOPY | | | FROM AREAS OUTSIDE THE DESIGNATED OPEN SPACE AREA | | | CANNOT BE COUNTED. ALL TREE CANOPY CREDITS FOR OPEN | | | SPACE REQUIREMENTS CAN BE FOUND IN TABLE IV-8. | | | | | | THE LIMITS OF THE PUBLIC OPEN SPACE AREA ARE SHOWN | | | BEYOND THE FUNCTIONAL QUALIFYING SPACE. (SEE APPROVED | | | PLANS). | | | THE PRIVATE OPEN SPACE AREAS AND CALCULATIONS NEED TO | | | BE SEPARATED BY EACH AREA AND IDENTIFIED BY TYPE, AND | | | EACH HAVE INDIVIDUAL QUALIFYING PERCENTAGES SHOWN. | | | EACH AREA MUST MEET THE CODE REQUIREMENTS ON ITS OWN, | | | NOT COMBINED OR INCLUDING TREE CANOPY FROM OUTSIDE THE | | | AREA. | | | STAFF IS AVAILABLE TO REVIEW THE PLANS WITH THE | | | LANDSCAPE ARCHITECT TO DISCUSS THESE COMMENTS AND | | | CLARIFY WHAT IS REQUESTED. | | | | | | 3. SATISFIED. PLEASE IDENTIFY EACH PUBLIC AND PRIVATE | | | OPEN SPACE AREA BY TYPE ACCORDING TO THE DEFINITIONS | | | FOUND IN SECTION 94-109. | | | THERE ARE THREE OPTIONS FROM TABLE IV-6 FOR QGD10 FOR | | | PUBLIC OPEN SPACE. GARDEN PLAZA, GARDEN COURTYARD OR | | | PASSAGEWAY. IDENTIFY WHAT THE TYPE IS FOR EACH PUBLIC | | | OPEN SPACE AREA. PLAZA IS NOT AN OPTION. | | | | | | 4. SATISFIED. PLEASE SHOW THE CALCULATIONS FOR TREE | | | CANOPY BY SPECIES FOR THE OPEN SPACE CATEGORIES PER | | | SECTION 94-109 TABLE IV-8. | | | TREES AND CANOPY CREDITS MUST BE LISTED AND LABELED FOR | | | EACH INDIVIDUAL SPACE. | | | STAFF IS AVAILABLE TO REVIEW THE PLANS WITH THE | | | LANDSCAPE ARCHITECT TO DISCUSS THESE COMMENTS AND | | | CLARIFY WHAT IS REQUESTED. | | | | | | | | | 5. SATISFIED. PLEASE PROVIDE INFORMATION ON HOW THE | | | TREES PROPOSED TO BE RELOCATED WILL BE STORED DURING | | | CONSTRUCTION. THE LOCATION ON SITE IS NOT FEASIBLE | | | DURING CONSTRUCTION OF THE BUILDING. QUALITY OF THE | | | EXISTING TREES AND PALMS IS NOT GOOD, AND THE | | | SURVIVABILITY MAY BE LOW WITH POTENTIALLY MOVING THEM | | | TWICE. SEE COMMENT 1. | | | | | | 6. SATISFIED. PLEASE PROVIDE A STRUCTURAL SOIL DETAIL | | | AND SHOW THE LOCATIONS OF STRUCTURAL SOIL ON THE | | | LANDSCAPE PLAN. | | | LOCATIONS FOR STRUCTURAL SOIL UNDER SIDEWALKS ADJACENT | | | TO STREET TREES MUST BE SHOWN CLEARLY ON THE LANDSCAPE | | | PLAN. AREAS ARE INCOMPLETE ON S DIXIE SIDE, AND THERE | | | ARE NONE SHOWN ON THE 4TH STREET SIDE. | | | | | | 7. SATISFIED. STREET TREES LOCATED IN A SIDEWALK THAT | | | IS ADJACENT TO A PERVIOUS LANDSCAPE AREA SHALL HAVE THE | | | STRUCTURAL SOIL EXTENDED UNDER THE SIDEWALK TO MEET THE | | | LANDSCAPE AREA IF THE DISTANCE BETWEEN THE 5 FOOT | | | REQUIRED STRUCTURAL SOIL AND THE LANDSCAPE AREA IS LESS | | | THAN 4 FEET. PLEASE SHOW THESE AREAS ON THE LANDSCAPE | | | PLAN. | | | SEE COMMENT #6. | | | | | | 8. SATISFIED. PLEASE SHOW SAFE SIGHT TRIANGLE AT | | | VEHICLE ENTRANCES AND EXITS. THE ENTRANCES NEED TO BE | | | ENGINEERED TO ALLOW ANY TREES AND SHRUBS AND | | | GROUNDCOVER TO BE PLANTED IN ANY LANDSCAPE AREAS | | | LOCATED ADJACENT TO THEM, AND STILL ALLOW SAFE SIGHT | | | TRIANGLES TO BE CLEAR. | | | | | | 9. SATISFIED. PISCIDIA PISCIPULA IS NOT COLD HARDY TO | | | THIS ZONE. PLEASE PROPOSE A MORE APPROPRIATE SPECIES. | | | | | | 10. SATISFIED. STRANGLER FIG IS NOT RECOMMENDED DUE TO | | | WHITEFLY ISSUES IN THIS AREA. PLEASE PROPOSE A MORE | | | APPROPRIATE SPECIES. | | | | | | 11. SATISFIED. QUERCUS VIRGINIANA ?CATHEDRAL? OAKS ARE | | | TO BE USED AS STREET TREES. PLEASE REVISE. | | | PLEASE CORRECT THE PLANT LIST TO READ QUERCUS | | | VIRGINIANA ?CATHEDRAL?. | | | ADDITIONAL COMMENTS 11/16/18: | | | 12. SATISFIED. UPDATE THE FLORIDA FRIENDLY LANDSCAPE | | | CHART TO CURRENT CODE. | | | PLANTS IN EACH CATEGORY CANNOT BE COUNTED TWICE PER THE | | | CODE. IF TAKING 51% OR MORE NATIVE CREDIT, THERE IS | | | ONLY THE DIFFERENCE FROM 100% LEFT TO CLAIM ANOTHER | | | CATEGORY. REVISE. | | | | | | 13. CONDITIONALLY SATISFIED. WATER, SEWER AND FIRE LINE | | | LOCATIONS ARE IN CONFLICT WITH STREET TREES IN SEVERAL | | | LOCATIONS. ADJUST LINE LOCATIONS TO AVOID CONFLICT AND | | | SHOW ROOT BARRIER LOCATIONS. | | | SHOW THE LOCATIONS OF THE UTILITIES ON THE LANDSCAPE | | | PLAN. | | | THE LANDSCAPE PLAN DOES NOT SHOW THE UTILITIES AS SHOWN | | | ON THE CIVIL PLANS, AND CONFLICTS STILL EXIST. | | | | | | 14. SATISFIED. PROVIDE A PLANT LIST OF SHRUB SPECIES | | | AND SIZES. MUST IDENTIFY DROUGHT TOLERANCE LEVELS AND | | | IF NATIVE PLANTS. | | | | | | 15. SATISFIED. UPDATE THE TREE DISPOSITION PLAN TO | | | REFLECT THE SUBMITTAL FOR THE TREE ALTERATION PERMIT. | | | | | | 16. SATISFIED. STREET TREES NEED TO BE SHOWN ON 5TH | | | STREET AND N DIXIE AS APPROVED ADJACENT TO THE PUBLIC | | | OPEN SPACE. | | | STREET TREES (OAKS) ON 5TH ST NEED TO BE LOCATED | | | ADJACENT TO THE CURB. THE PUBLIC OPEN SPACE MAY BE | | | EXPANDED TO THE BACK OF CURB | | | | | | 17. SATISFIED. STREET TREES PROPOSED ALONG QUADRILLE | | | APPEAR TO BE LOCATED IN EASEMENTS THAT WILL NOT ALLOW | | | THEM. THE APPROVED PLAN SHOWS THE TREES OUTSIDE OF THE | | | EASEMENTS AND SHOULD BE FOLLOWED. | | | PROVIDE FPL RELEASE ACCEPTING THE PROPOSED LANDSCAPING | | | IN THEIR EASEMENT. | | | ADDITIONAL COMMENTS 2/21/19: | | | | | | 18. SATISFIED. THE STRUCTURAL SOIL LOCATIONS CONFLICT | | | WITH EXFILTRATION TRENCHES. THESE ARE INCOMPATIBLE, AS | | | ONE IS INTENDED TO PROMOTE TREE ROOT GROWTH, AND THE | | | OTHER IS NOT INTENDED FOR ROOT INTRUSION. EXFILTRATION | | | IS NOT SUSTAINABLE. | | | | | | 19. SATISFIED. A NEW FPL POLE WAS RECENTLY INSTALLED | | | AT THE CORNER OF 4TH ST AND QUADRILLE THAT WILL NOT | | | ALLOW THE LIVE OAKS TO BE PLANTED WITHIN 30 FEET OF THE | | | LINES. INDICATE IF THIS POLE WILL BE REMOVED AND LINES | | | RELOCATED TO ALLOW THE PLANTING OF THE STREET TREES. | | | | | | CONDITIONS OF APPROVAL | | | | | | 1. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE INSTALLATION OF THE STREET TREES | | | AND RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED | | | WITH THIS PETITION. THE APPLICANT SHALL ASSURE THAT ALL | | | EXISTING CITY IRRIGATION IN THE RIGHT OF WAY REMAINS | | | INTACT AND FUNCTIONAL FOR ALL OTHER LOCATIONS, WHILE | | | ALL IRRIGATION TO STREET TREES ADJACENT TO THE PROPERTY | | | WILL BE SERVED BY THE PROJECTS IRRIGATION SYSTEM. | | | | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A | | | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | | | | 3. THE APPLICANT SHALL REVISE THE PLANS AT PERMITTING | | | TO RETAIN AT LEAST 50 PERCENT OF THE PALMS AS SHOWN ON | | | THE APPROVED PLAN BY SPECIES OR RETURN FOR DAC REVIEW. | | | | | | 4. PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF | | | OCCUPANCY, ALL APPROVED AND PERMITTED LANDSCAPING SHALL | | | BE INSTALLED AND INSPECTED, AND ALL TREE MITIGATION DUE | | | SHALL BE SATISFIED BY REPLACEMENT ON SITE OR PAYMENT IN | | | LIEU. | | | | | | 5. PRIOR TO THE ISSUANCE OF THE LANDSCAPE PERMIT, THE | | | APPLICANT SHALL REVISE THE LANDSCAPE PLAN AND SHOW | | | ADJUSTMENTS TO UTILITY LOCATIONS SO THAT CONFLICTS ARE | | | ELIMINATED. | | | | | | NOTE CONDITIONS 3, 4 AND 5. THESE ARE TO SATISFY | | | COMMENTS THAT HAVE NOT BEEN ADDRESSED. |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
4 |
Status |
F |
Date |
02-25-2019 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
02-25-2019 |
Time |
16:19 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
02-25-2019 |
Time |
16:19 |
Sent To |
|
|
| Notes |
| 2019-02-25 16:20:03 | FROM: RAY CARANCI, LANDSCAPE PLANNER | | | PROJECT: 550 QUADRILLE Z17020040 | | | FEBRUARY 21, 2019 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. NOT SATISFIED. PLEASE REFER TO THE PREVIOUSLY | | | APPROVED PLAN FOR REFERENCE ON THE TREE DISPOSITION, | | | MITIGATION AND OPEN SPACE REQUIREMENTS. | | | THE QUALITY OF THE PLANTINGS USING THE SABAL PALMS | | | APPEARS TO BE A DOWNGRADE FROM THE APPROVED PLAN. THE | | | SABAL PALMS DO NOT HAVE TO BE USED ON SITE, THEY CAN BE | | | RELOCATED TO ANOTHER LOCATION WITHIN THE CITY, | | | INCLUDING PUBLIC SPACES. | | | THE QUANTITY AND QUALITY OF THE LANDSCAPING IS REDUCED | | | FOR THE PROPOSED LANDSCAPE PLAN. STAFF REQUESTS THAT | | | QUANTITIES OF STREET TREES BE MAINTAINED AS APPROVED, | | | AND PUBLIC OPEN SPACE AREAS PROVIDE COMPARABLE TREE | | | CANOPY AREA AS THE APPROVED PLAN. | | | STAFF IS AVAILABLE TO REVIEW THE PLANS WITH THE | | | LANDSCAPE ARCHITECT TO DISCUSS THESE COMMENTS AND | | | CLARIFY WHAT IS REQUESTED. | | | | | | | | | | | | 2. PARTIALLY SATISFIED. PLEASE PROVIDE A DIAGRAM AND | | | CALCULATIONS TO SHOW THE OPEN SPACE AREAS BY CATEGORY, | | | AND PERCENTAGE OF VEGETATED AREA AND TREE CANOPY TO | | | MEET THE REQUIREMENTS OF SECTION 94-109 TABLE IV-7. | | | EACH OPEN SPACE AREA NEEDS TO BE DEFINED. TREE CANOPY | | | FROM AREAS OUTSIDE THE DESIGNATED OPEN SPACE AREA | | | CANNOT BE COUNTED. ALL TREE CANOPY CREDITS FOR OPEN | | | SPACE REQUIREMENTS CAN BE FOUND IN TABLE IV-8. | | | | | | THE LIMITS OF THE PUBLIC OPEN SPACE AREA ARE SHOWN | | | BEYOND THE FUNCTIONAL QUALIFYING SPACE. (SEE APPROVED | | | PLANS). | | | THE PRIVATE OPEN SPACE AREAS AND CALCULATIONS NEED TO | | | BE SEPARATED BY EACH AREA AND IDENTIFIED BY TYPE, AND | | | EACH HAVE INDIVIDUAL QUALIFYING PERCENTAGES SHOWN. | | | EACH AREA MUST MEET THE CODE REQUIREMENTS ON ITS OWN, | | | NOT COMBINED OR INCLUDING TREE CANOPY FROM OUTSIDE THE | | | AREA. | | | STAFF IS AVAILABLE TO REVIEW THE PLANS WITH THE | | | LANDSCAPE ARCHITECT TO DISCUSS THESE COMMENTS AND | | | CLARIFY WHAT IS REQUESTED. | | | | | | 3. NOT SATISFIED. PLEASE IDENTIFY EACH PUBLIC AND | | | PRIVATE OPEN SPACE AREA BY TYPE ACCORDING TO THE | | | DEFINITIONS FOUND IN SECTION 94-109. | | | THERE ARE THREE OPTIONS FROM TABLE IV-6 FOR QGD10 FOR | | | PUBLIC OPEN SPACE. GARDEN PLAZA, GARDEN COURTYARD OR | | | PASSAGEWAY. IDENTIFY WHAT THE TYPE IS FOR EACH PUBLIC | | | OPEN SPACE AREA. PLAZA IS NOT AN OPTION. | | | | | | 4. PARTIALLY SATISFIED. PLEASE SHOW THE CALCULATIONS | | | FOR TREE CANOPY BY SPECIES FOR THE OPEN SPACE | | | CATEGORIES PER SECTION 94-109 TABLE IV-8. | | | TREES AND CANOPY CREDITS MUST BE LISTED AND LABELED FOR | | | EACH INDIVIDUAL SPACE. | | | STAFF IS AVAILABLE TO REVIEW THE PLANS WITH THE | | | LANDSCAPE ARCHITECT TO DISCUSS THESE COMMENTS AND | | | CLARIFY WHAT IS REQUESTED. | | | | | | | | | 5. SATISFIED. PLEASE PROVIDE INFORMATION ON HOW THE | | | TREES PROPOSED TO BE RELOCATED WILL BE STORED DURING | | | CONSTRUCTION. THE LOCATION ON SITE IS NOT FEASIBLE | | | DURING CONSTRUCTION OF THE BUILDING. QUALITY OF THE | | | EXISTING TREES AND PALMS IS NOT GOOD, AND THE | | | SURVIVABILITY MAY BE LOW WITH POTENTIALLY MOVING THEM | | | TWICE. SEE COMMENT 1. | | | | | | 6. SATISFIED. PLEASE PROVIDE A STRUCTURAL SOIL DETAIL | | | AND SHOW THE LOCATIONS OF STRUCTURAL SOIL ON THE | | | LANDSCAPE PLAN. | | | LOCATIONS FOR STRUCTURAL SOIL UNDER SIDEWALKS ADJACENT | | | TO STREET TREES MUST BE SHOWN CLEARLY ON THE LANDSCAPE | | | PLAN. AREAS ARE INCOMPLETE ON S DIXIE SIDE, AND THERE | | | ARE NONE SHOWN ON THE 4TH STREET SIDE. | | | | | | 7. SATISFIED. STREET TREES LOCATED IN A SIDEWALK THAT | | | IS ADJACENT TO A PERVIOUS LANDSCAPE AREA SHALL HAVE THE | | | STRUCTURAL SOIL EXTENDED UNDER THE SIDEWALK TO MEET THE | | | LANDSCAPE AREA IF THE DISTANCE BETWEEN THE 5 FOOT | | | REQUIRED STRUCTURAL SOIL AND THE LANDSCAPE AREA IS LESS | | | THAN 4 FEET. PLEASE SHOW THESE AREAS ON THE LANDSCAPE | | | PLAN. | | | SEE COMMENT #6. | | | | | | 8. SATISFIED. PLEASE SHOW SAFE SIGHT TRIANGLE AT | | | VEHICLE ENTRANCES AND EXITS. THE ENTRANCES NEED TO BE | | | ENGINEERED TO ALLOW ANY TREES AND SHRUBS AND | | | GROUNDCOVER TO BE PLANTED IN ANY LANDSCAPE AREAS | | | LOCATED ADJACENT TO THEM, AND STILL ALLOW SAFE SIGHT | | | TRIANGLES TO BE CLEAR. | | | | | | 9. SATISFIED. PISCIDIA PISCIPULA IS NOT COLD HARDY TO | | | THIS ZONE. PLEASE PROPOSE A MORE APPROPRIATE SPECIES. | | | | | | 10. SATISFIED. STRANGLER FIG IS NOT RECOMMENDED DUE TO | | | WHITEFLY ISSUES IN THIS AREA. PLEASE PROPOSE A MORE | | | APPROPRIATE SPECIES. | | | | | | 11. SATISFIED. QUERCUS VIRGINIANA ?CATHEDRAL? OAKS ARE | | | TO BE USED AS STREET TREES. PLEASE REVISE. | | | PLEASE CORRECT THE PLANT LIST TO READ QUERCUS | | | VIRGINIANA ?CATHEDRAL?. | | | ADDITIONAL COMMENTS 11/16/18: | | | 12. PARTIALLY SATISFIED. UPDATE THE FLORIDA FRIENDLY | | | LANDSCAPE CHART TO CURRENT CODE. | | | PLANTS IN EACH CATEGORY CANNOT BE COUNTED TWICE PER THE | | | CODE. IF TAKING 51% OR MORE NATIVE CREDIT, THERE IS | | | ONLY THE DIFFERENCE FROM 100% LEFT TO CLAIM ANOTHER | | | CATEGORY. REVISE. | | | | | | 13. NOT SATISFIED. WATER, SEWER AND FIRE LINE LOCATIONS | | | ARE IN CONFLICT WITH STREET TREES IN SEVERAL LOCATIONS. | | | ADJUST LINE LOCATIONS TO AVOID CONFLICT AND SHOW ROOT | | | BARRIER LOCATIONS. | | | SHOW THE LOCATIONS OF THE UTILITIES ON THE LANDSCAPE | | | PLAN. | | | THE LANDSCAPE PLAN DOES NOT SHOW THE UTILITIES AS SHOWN | | | ON THE CIVIL PLANS, AND CONFLICTS STILL EXIST. | | | | | | 14. SATISFIED. PROVIDE A PLANT LIST OF SHRUB SPECIES | | | AND SIZES. MUST IDENTIFY DROUGHT TOLERANCE LEVELS AND | | | IF NATIVE PLANTS. | | | | | | 15. SATISFIED. UPDATE THE TREE DISPOSITION PLAN TO | | | REFLECT THE SUBMITTAL FOR THE TREE ALTERATION PERMIT. | | | | | | 16. PARTIALLY SATISFIED. STREET TREES NEED TO BE SHOWN | | | ON 5TH STREET AND N DIXIE AS APPROVED ADJACENT TO THE | | | PUBLIC OPEN SPACE. | | | STREET TREES (OAKS) ON 5TH ST NEED TO BE LOCATED | | | ADJACENT TO THE CURB. THE PUBLIC OPEN SPACE MAY BE | | | EXPANDED TO THE BACK OF CURB | | | | | | 17. PARTIALLY SATISFIED. STREET TREES PROPOSED ALONG | | | QUADRILLE APPEAR TO BE LOCATED IN EASEMENTS THAT WILL | | | NOT ALLOW THEM. THE APPROVED PLAN SHOWS THE TREES | | | OUTSIDE OF THE EASEMENTS AND SHOULD BE FOLLOWED. | | | PROVIDE FPL RELEASE ACCEPTING THE PROPOSED LANDSCAPING | | | IN THEIR EASEMENT. | | | ADDITIONAL COMMENTS 2/21/19: | | | | | | 18. THE STRUCTURAL SOIL LOCATIONS CONFLICT WITH | | | EXFILTRATION TRENCHES. THESE ARE INCOMPATIBLE, AS ONE | | | IS INTENDED TO PROMOTE TREE ROOT GROWTH, AND THE OTHER | | | IS NOT INTENDED FOR ROOT INTRUSION. EXFILTRATION IS NOT | | | SUSTAINABLE. | | | | | | 19. A NEW FPL POLE WAS RECENTLY INSTALLED AT THE | | | CORNER OF 4TH ST AND QUADRILLE THAT WILL NOT ALLOW THE | | | LIVE OAKS TO BE PLANTED WITHIN 30 FEET OF THE LINES. | | | INDICATE IF THIS POLE WILL BE REMOVED AND LINES | | | RELOCATED TO ALLOW THE PLANTING OF THE STREET TREES. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | STREET TREES AND RIGHT OF WAY LANDSCAPING AND | | | IRRIGATION APPROVED WITH THIS PETITION. | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A | | | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
3 |
Status |
F |
Date |
11-16-2018 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
11-16-2018 |
Time |
16:45 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
11-16-2018 |
Time |
16:45 |
Sent To |
|
|
| Notes |
| 2018-11-16 16:45:32 | FROM: RAY CARANCI, LANDSCAPE PLANNER | | | PROJECT: 550 QUADRILLE Z17020040 | | | NOVEMBER 16, 2018 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. NOT SATISFIED. PLEASE REFER TO THE PREVIOUSLY | | | APPROVED PLAN FOR REFERENCE ON THE TREE DISPOSITION, | | | MITIGATION AND OPEN SPACE REQUIREMENTS. | | | THE QUALITY OF THE PLANTINGS USING THE SABAL PALMS | | | APPEARS TO BE A DOWNGRADE FROM THE APPROVED PLAN. THE | | | SABAL PALMS DO NOT HAVE TO BE USED ON SITE, THEY CAN BE | | | RELOCATED TO ANOTHER LOCATION WITHIN THE CITY, | | | INCLUDING PUBLIC SPACES. | | | THE QUANTITY AND QUALITY OF THE LANDSCAPING IS REDUCED | | | FOR THE PROPOSED LANDSCAPE PLAN. STAFF REQUESTS THAT | | | QUANTITIES OF STREET TREES BE MAINTAINED AS APPROVED, | | | AND PUBLIC OPEN SPACE AREAS PROVIDE COMPARABLE TREE | | | CANOPY AREA AS THE APPROVED PLAN. | | | | | | 2. NOT SATISFIED. PLEASE PROVIDE A DIAGRAM AND | | | CALCULATIONS TO SHOW THE OPEN SPACE AREAS BY CATEGORY, | | | AND PERCENTAGE OF VEGETATED AREA AND TREE CANOPY TO | | | MEET THE REQUIREMENTS OF SECTION 94-109 TABLE IV-7. | | | EACH OPEN SPACE AREA NEEDS TO BE DEFINED. TREE CANOPY | | | FROM AREAS OUTSIDE THE DESIGNATED OPEN SPACE AREA | | | CANNOT BE COUNTED. ALL TREE CANOPY CREDITS FOR OPEN | | | SPACE REQUIREMENTS CAN BE FOUND IN TABLE IV-8. | | | | | | 3. NOT SATISFIED. PLEASE IDENTIFY EACH PUBLIC AND | | | PRIVATE OPEN SPACE AREA BY TYPE ACCORDING TO THE | | | DEFINITIONS FOUND IN SECTION 94-109. | | | THERE ARE THREE OPTIONS FROM TABLE IV-6 FOR QGD10 FOR | | | PUBLIC OPEN SPACE. GARDEN PLAZA, GARDEN COURTYARD OR | | | PASSAGEWAY. IDENTIFY WHAT THE TYPE IS FOR EACH PUBLIC | | | OPEN SPACE AREA. PLAZA IS NOT AN OPTION. | | | | | | 4. NOT SATISFIED. PLEASE SHOW THE CALCULATIONS FOR TREE | | | CANOPY BY SPECIES FOR THE OPEN SPACE CATEGORIES PER | | | SECTION 94-109 TABLE IV-8. | | | TREES AND CANOPY CREDITS MUST BE LISTED AND LABELED. | | | | | | 5. SATISFIED. PLEASE PROVIDE INFORMATION ON HOW THE | | | TREES PROPOSED TO BE RELOCATED WILL BE STORED DURING | | | CONSTRUCTION. THE LOCATION ON SITE IS NOT FEASIBLE | | | DURING CONSTRUCTION OF THE BUILDING. QUALITY OF THE | | | EXISTING TREES AND PALMS IS NOT GOOD, AND THE | | | SURVIVABILITY MAY BE LOW WITH POTENTIALLY MOVING THEM | | | TWICE. SEE COMMENT 1. | | | | | | 6. NOT SATISFIED. PLEASE PROVIDE A STRUCTURAL SOIL | | | DETAIL AND SHOW THE LOCATIONS OF STRUCTURAL SOIL ON THE | | | LANDSCAPE PLAN. | | | LOCATIONS FOR STRUCTURAL SOIL UNDER SIDEWALKS ADJACENT | | | TO STREET TREES MUST BE SHOWN CLEARLY ON THE LANDSCAPE | | | PLAN. AREAS ARE INCOMPLETE ON S DIXIE SIDE, AND THERE | | | ARE NONE SHOWN ON THE 4TH STREET SIDE. | | | | | | 7. NOT SATISFIED. STREET TREES LOCATED IN A SIDEWALK | | | THAT IS ADJACENT TO A PERVIOUS LANDSCAPE AREA SHALL | | | HAVE THE STRUCTURAL SOIL EXTENDED UNDER THE SIDEWALK TO | | | MEET THE LANDSCAPE AREA IF THE DISTANCE BETWEEN THE 5 | | | FOOT REQUIRED STRUCTURAL SOIL AND THE LANDSCAPE AREA IS | | | LESS THAN 4 FEET. PLEASE SHOW THESE AREAS ON THE | | | LANDSCAPE PLAN. | | | SEE COMMENT #6. | | | | | | 8. SATISFIED. PLEASE SHOW SAFE SIGHT TRIANGLE AT | | | VEHICLE ENTRANCES AND EXITS. THE ENTRANCES NEED TO BE | | | ENGINEERED TO ALLOW ANY TREES AND SHRUBS AND | | | GROUNDCOVER TO BE PLANTED IN ANY LANDSCAPE AREAS | | | LOCATED ADJACENT TO THEM, AND STILL ALLOW SAFE SIGHT | | | TRIANGLES TO BE CLEAR. | | | | | | 9. SATISFIED. PISCIDIA PISCIPULA IS NOT COLD HARDY TO | | | THIS ZONE. PLEASE PROPOSE A MORE APPROPRIATE SPECIES. | | | | | | 10. SATISFIED. STRANGLER FIG IS NOT RECOMMENDED DUE TO | | | WHITEFLY ISSUES IN THIS AREA. PLEASE PROPOSE A MORE | | | APPROPRIATE SPECIES. | | | | | | 11. SATISFIED. QUERCUS VIRGINIANA ?CATHEDRAL? OAKS ARE | | | TO BE USED AS STREET TREES. PLEASE REVISE. | | | PLEASE CORRECT THE PLANT LIST TO READ QUERCUS | | | VIRGINIANA ?CATHEDRAL?. | | | ADDITIONAL COMMENTS 11/16/18: | | | 12. UPDATE THE FLORIDA FRIENDLY LANDSCAPE CHART TO | | | CURRENT CODE. | | | | | | 13. WATER, SEWER AND FIRE LINE LOCATIONS ARE IN | | | CONFLICT WITH STREET TREES IN SEVERAL LOCATIONS. ADJUST | | | LINE LOCATIONS TO AVOID CONFLICT AND SHOW ROOT BARRIER | | | LOCATIONS. | | | | | | 14. PROVIDE A PLANT LIST OF SHRUB SPECIES AND SIZES. | | | MUST IDENTIFY DROUGHT TOLERANCE LEVELS AND IF NATIVE | | | PLANTS. | | | | | | 15. UPDATE THE TREE DISPOSITION PLAN TO REFLECT THE | | | SUBMITTAL FOR THE TREE ALTERATION PERMIT. | | | | | | 16. STREET TREES NEED TO BE SHOWN ON 5TH STREET AND N | | | DIXIE AS APPROVED ADJACENT TO THE PUBLIC OPEN SPACE. | | | 17. STREET TREES PROPOSED ALONG QUADRILLE APPEAR TO BE | | | LOCATED IN EASEMENTS THAT WILL NOT ALLOW THEM. THE | | | APPROVED PLAN SHOWS THE TREES OUTSIDE OF THE EASEMENTS, | | | AND SHOULD BE FOLLOWED. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | STREET TREES AND RIGHT OF WAY LANDSCAPING AND | | | IRRIGATION APPROVED WITH THIS PETITION. | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A | | | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
F |
Date |
05-24-2017 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
05-12-2017 |
Time |
11:14 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
05-12-2017 |
Time |
11:08 |
Sent To |
|
|
| Notes |
| 2017-05-24 11:16:13 | FROM: RAY CARANCI, LANDSCAPE PLANNER | | | PROJECT: 550 QUADRILLE Z17020040 | | | MAY 12, 2017 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | THESE COMMENTS WERE REVIEWED WITH THE APPLICANT IN A | | | CONFERENCE CALL MEETING ON 5/12/17. | | | | | | 1. NOT SATISFIED. PLEASE REFER TO THE PREVIOUSLY | | | APPROVED PLAN FOR REFERENCE ON THE TREE DISPOSITION, | | | MITIGATION AND OPEN SPACE REQUIREMENTS. | | | THE QUALITY OF THE PLANTINGS USING THE SABAL PALMS | | | APPEARS TO BE A DOWNGRADE FROM THE APPROVED PLAN. THE | | | SABAL PALMS DO NOT HAVE TO BE USED ON SITE, THEY CAN BE | | | RELOCATED TO ANOTHER LOCATION WITHIN THE CITY, | | | INCLUDING PUBLIC SPACES. | | | | | | 2. NOT SATISFIED. PLEASE PROVIDE A DIAGRAM AND | | | CALCULATIONS TO SHOW THE OPEN SPACE AREAS BY CATEGORY, | | | AND PERCENTAGE OF VEGETATED AREA AND TREE CANOPY TO | | | MEET THE REQUIREMENTS OF SECTION 94-109 TABLE IV-7. | | | | | | 3. NOT SATISFIED. PLEASE IDENTIFY EACH PUBLIC AND | | | PRIVATE OPEN SPACE AREA BY TYPE ACCORDING TO THE | | | DEFINITIONS FOUND IN SECTION 94-109. | | | | | | 4. NOT SATISFIED. PLEASE SHOW THE CALCULATIONS FOR TREE | | | CANOPY BY SPECIES FOR THE OPEN SPACE CATEGORIES PER | | | SECTION 94-109 TABLE IV-8. | | | | | | 5. SATISFIED. PLEASE PROVIDE INFORMATION ON HOW THE | | | TREES PROPOSED TO BE RELOCATED WILL BE STORED DURING | | | CONSTRUCTION. THE LOCATION ON SITE IS NOT FEASIBLE | | | DURING CONSTRUCTION OF THE BUILDING. QUALITY OF THE | | | EXISTING TREES AND PALMS IS NOT GOOD, AND THE | | | SURVIVABILITY MAY BE LOW WITH POTENTIALLY MOVING THEM | | | TWICE. SEE COMMENT 1. | | | | | | 6. NOT SATISFIED. PLEASE PROVIDE A STRUCTURAL SOIL | | | DETAIL AND SHOW THE LOCATIONS OF STRUCTURAL SOIL ON THE | | | LANDSCAPE PLAN. | | | | | | 7. NOT SATISFIED. STREET TREES LOCATED IN A SIDEWALK | | | THAT IS ADJACENT TO A PERVIOUS LANDSCAPE AREA SHALL | | | HAVE THE STRUCTURAL SOIL EXTENDED UNDER THE SIDEWALK TO | | | MEET THE LANDSCAPE AREA IF THE DISTANCE BETWEEN THE 5 | | | FOOT REQUIRED STRUCTURAL SOIL AND THE LANDSCAPE AREA IS | | | LESS THAN 4 FEET. PLEASE SHOW THESE AREAS ON THE | | | LANDSCAPE PLAN. | | | | | | 8. SATISFIED. PLEASE SHOW SAFE SIGHT TRIANGLE AT | | | VEHICLE ENTRANCES AND EXITS. THE ENTRANCES NEED TO BE | | | ENGINEERED TO ALLOW ANY TREES AND SHRUBS AND | | | GROUNDCOVER TO BE PLANTED IN ANY LANDSCAPE AREAS | | | LOCATED ADJACENT TO THEM, AND STILL ALLOW SAFE SIGHT | | | TRIANGLES TO BE CLEAR. | | | | | | 9. SATISFIED. PISCIDIA PISCIPULA IS NOT COLD HARDY TO | | | THIS ZONE. PLEASE PROPOSE A MORE APPROPRIATE SPECIES. | | | | | | 10. SATISFIED. STRANGLER FIG IS NOT RECOMMENDED DUE TO | | | WHITEFLY ISSUES IN THIS AREA. PLEASE PROPOSE A MORE | | | APPROPRIATE SPECIES. | | | | | | 11. NOT SATISFIED. QUERCUS VIRGINIANA ?CATHEDRAL? OAKS | | | ARE TO BE USED AS STREET TREES. PLEASE REVISE. | | | PLEASE CORRECT THE PLANT LIST TO READ QUERCUS | | | VIRGINIANA ?CATHEDRAL?. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | STREET TREES AND RIGHT OF WAY LANDSCAPING AND | | | IRRIGATION APPROVED WITH THIS PETITION. | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A | | | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
03-07-2017 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
03-07-2017 |
Time |
17:01 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
03-07-2017 |
Time |
17:01 |
Sent To |
|
|
| Notes |
| 2017-03-07 17:01:53 | FROM: RAY CARANCI, LANDSCAPE PLANNER | | | PROJECT: 550 QUADRILLE Z17020040 | | | MARCH 7, 2017 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | | | | 1. PLEASE REFER TO THE PREVIOUSLY APPROVED PLAN FOR | | | REFERENCE ON THE TREE DISPOSITION, MITIGATION AND OPEN | | | SPACE REQUIREMENTS. | | | | | | 2. PLEASE PROVIDE A DIAGRAM AND CALCULATIONS TO SHOW | | | THE OPEN SPACE AREAS BY CATEGORY, AND PERCENTAGE OF | | | VEGETATED AREA AND TREE CANOPY TO MEET THE REQUIREMENTS | | | OF SECTION 94-109 TABLE IV-7. | | | | | | 3. PLEASE IDENTIFY EACH PUBLIC AND PRIVATE OPEN SPACE | | | AREA BY TYPE ACCORDING TO THE DEFINITIONS FOUND IN | | | SECTION 94-109. | | | | | | 4. PLEASE SHOW THE CALCULATIONS FOR TREE CANOPY BY | | | SPECIES FOR THE OPEN SPACE CATEGORIES PER SECTION | | | 94-109 TABLE IV-8. | | | | | | 5. PLEASE PROVIDE INFORMATION ON HOW THE TREES PROPOSED | | | TO BE RELOCATED WILL BE STORED DURING CONSTRUCTION. THE | | | LOCATION ON SITE IS NOT FEASIBLE DURING CONSTRUCTION OF | | | THE BUILDING. QUALITY OF THE EXISTING TREES AND PALMS | | | IS NOT GOOD, AND THE SURVIVABILITY MAY BE LOW WITH | | | POTENTIALLY MOVING THEM TWICE. SEE COMMENT 1. | | | | | | 6. PLEASE PROVIDE A STRUCTURAL SOIL DETAIL AND SHOW THE | | | LOCATIONS OF STRUCTURAL SOIL ON THE LANDSCAPE PLAN. | | | | | | 7. STREET TREES LOCATED IN A SIDEWALK THAT IS ADJACENT | | | TO A PERVIOUS LANDSCAPE AREA SHALL HAVE THE STRUCTURAL | | | SOIL EXTENDED UNDER THE SIDEWALK TO MEET THE LANDSCAPE | | | AREA IF THE DISTANCE BETWEEN THE 5 FOOT REQUIRED | | | STRUCTURAL SOIL AND THE LANDSCAPE AREA IS LESS THAN 4 | | | FEET. PLEASE SHOW THESE AREAS ON THE LANDSCAPE PLAN. | | | | | | 8. PLEASE SHOW SAFE SIGHT TRIANGLE AT VEHICLE ENTRANCES | | | AND EXITS. THE ENTRANCES NEED TO BE ENGINEERED TO ALLOW | | | ANY TREES AND SHRUBS AND GROUNDCOVER TO BE PLANTED IN | | | ANY LANDSCAPE AREAS LOCATED ADJACENT TO THEM, AND STILL | | | ALLOW SAFE SIGHT TRIANGLES TO BE CLEAR. | | | | | | 9. PISCIDIA PISCIPULA IS NOT COLD HARDY TO THIS ZONE. | | | PLEASE PROPOSE A MORE APPROPRIATE SPECIES. | | | | | | 10. STRANGLER FIG IS NOT RECOMMENDED DUE TO WHITEFLY | | | ISSUES IN THIS AREA. PLEASE PROPOSE A MORE APPROPRIATE | | | SPECIES. | | | | | | 11. QUERCUS VIRGINIANA ?CATHEDRAL? OAKS ARE TO BE USED | | | AS STREET TREES. PLEASE REVISE. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | STREET TREES AND RIGHT OF WAY LANDSCAPING AND | | | IRRIGATION APPROVED WITH THIS PETITION. | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A | | | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
P |
Date |
02-14-2019 |
|
|
Cont ID |
|
| Sent By |
|
Date |
02-14-2019 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
02-14-2019 |
Time |
|
Sent To |
|
|
| Notes |
| 2019-02-14 13:28:37 | THE PROPERTY BASED ON THE PRINT IS TO HAVE ITS | | | SANITATION SERVICE PROVIDED BY A ROLL OFF COMPACTOR | | | SYSTEM. PLEASE BE AWARE THAT THE VENDOR MUST BE ONE OF | | | THE FRANCHISED VENDORS AUTHORIZED BY THE CITY. |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
7 |
Status |
P |
Date |
03-23-2020 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
03-23-2020 |
Time |
13:03 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
03-23-2020 |
Time |
13:27 |
Sent To |
|
|
| Notes |
| 2020-03-23 13:26:44 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF | | | ENGINEERING PLANS AND ARCHITRECTURAL PLANS RECEIVED BY | | | THE CITY ON FEBRUARY 6, 2020, THEY CAN BE ADDRESSED | | | DURING ENGINEERING PERMIT SUBMITTAL AND/OR MADE | | | CONDITIONS OF SITE PLAN APPROVAL, WHERE APPROPRIATE: | | | | | | 1. PROPOSED INVERT ELEVATIONS FOR THE SANITARY SEWER | | | PIPE BETWEEN MH#2 AND MH #2B DO NOT SUPPORT THE LISTED | | | PROPOSED SLOPE OF 0.58%. | | | | | | 2. ENGINEERING SHEET #9: | | | A. SECTION 'D-D' - SHOW A SHALLOW "SWALE" BETWEEN | | | BUIDLING AND BACK OF SIDEWALK INSTEAD OF STRRAIGHT | | | SLOPE. THIS AREA IS TO DRAIN TO THE 12" DECORATIVE | | | FLOOR DRAIN IN THE EAST PART OF THE PLAZA. | | | | | | B. SECTION 'C-C' - THE 21' DRIVE WILL SLOPE AT ~4% | | | INSTEAD OF 1.0% SHOWN ON THE SECTION WITH THE SPOT | | | GRADE OF 13.00 SHOWN AT THE TRAFFIC/CURB SEPARATOR ON | | | THE GRADING PLAN. | | | | | | C. SECTION 'G-G' - CURBING IS SHOWN ALONG THE PROPERTY | | | LINE BUT THE CURBING IS NOT CALLED OUT ON SHEET 4. THE | | | BUILDING FINISHED FLOOR OF 13.20 FT NGVD IS LESS THAN 3 | | | INCHES HIGHER THAN THE BACK OF (12' WIDE) SIDEWALK | | | ELEVATION OF 12.96. | | | | | | 3. DIFFERENT DISTANCES SHOWN BETWEEN THE PROPERTY LINE | | | AND THE EDGE OF PAVEMENT ON SECTIONS 'G - G' (14.0 | | | FEET) AND 'H - H' (13.0 FEET). | | | | | | 4. DIFFERENT LANE WIDTHS ARE SHOWN ON SHEET A0.04 AND | | | SECTIONS 'C - C', 'F - F' AND 'I - I' ON ENGINEERING | | | SHEET 9. | | | | | | TRACY WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | [email protected] | | | 561-494-1120 | | | | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
6 |
Status |
F |
Date |
08-28-2019 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
08-28-2019 |
Time |
17:14 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
08-28-2019 |
Time |
17:51 |
Sent To |
|
|
| Notes |
| 2019-08-28 17:15:47 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | AUGUST 22, 2019 ROUTED SUBMITTAL PACKAGE. | | | | | | 1. CONFIRM THERE WILL NOT BE A RAISED CURB BETWEEN THE | | | PLANTERS ALONG N. DIXIE HWY AND THE ADJACENT SIDEWALK | | | AND THAT RUNOFF FROM THE SIDEWALK WEST OF THE PLANTERS | | | WILL BE ABLE TO FLOW INTO THE PLANTERS. | | | | | | 2. PROVIDE VIDEO OF EXISTING STORM PIPES ON 4TH STREET. | | | SOME PIPES MAY BE VCP. (REPEAT COMMENT) | | | | | | 3. ADD THE CONVERSION EQUATION TO NGVD1929 TO GENERAL | | | NOTE #7 ON THE COVER SHEET. (REPEAT COMMENT) | | | | | | 4. CALL OUT THE TYPE OF CURB RAMPS AND ADA MATS FOR | | | DRIVEWAYS CROSSING THE SIDEWALK ON 4TH STREET.(REPEAT | | | COMMENT) | | | | | | 5. CIVIL PLAN 5 SIGNING AND MARKING PLAN: | | | A. PARKING DIMENSIONS DO NOT LINE UP WITH THE STRIPING | | | ON 4TH STREET.(REPEAT COMMENT) | | | | | | 6. PROVIDE DIMENSIONS AND ELEVATIONS (TOP AND BOTTOM OF | | | TRENCH) OF THE EXFILTRATION TRENCHES | | | | | | 7. DIFFERENT VERTICAL DATUMS REFERENCED ON THE CIVIL | | | AND ARCHITECTURAL PLANS AND THE FFE'S VARY: | | | CIVIL PLANS LIST FFE'S AS: | | | A. 15.70 FEET NAVD88 FOR PROPOSED OFFICE TOWER | | | B. 13.95 FEET NAVD88 FOR PROPOSED RESIDENTIAL TOWER | | | C. 13.20 FEET NAVD88 FOR PROPOSED RETAIL BUILDING. | | | | | | THE ELEVATION VIEWS OF THE ARCHITECTURAL PLANS LIST | | | FFE'S AS: | | | A. 15 FEET 6 INCHES NGVD29 FOR THE PROPOSED OFFICE | | | TOWER | | | B. 13 FEET 9 INCHES NGVD29 FOR THE PROPOSED RESIDENTIAL | | | TOWER | | | C. 13 FEET 0 INCHES NGVD29 FOR THE PROPOSED RETAIL | | | BUILDING. | | | | | | 8. EAST ELEVATION ON SHEET A2.01 SHOWS 18 FEET 0 INCHES | | | FROM THE LEVEL 2 PODIUM TO THE GROUND LEVEL BUT | | | DIFFERENCE IN ELEVATIONS IS 10.5 FEET (33 FEET 6 INCHES | | | MINUS 13 FEET 0 INCHES). | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | [email protected] | | | 561-494-1120 | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
5 |
Status |
F |
Date |
04-17-2019 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
04-17-2019 |
Time |
18:25 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
04-17-2019 |
Time |
18:59 |
Sent To |
|
|
| Notes |
| 2019-04-17 18:59:26 | THE COMMENTS BELOW ARE FROM THE REVIEW OF THE APRIL 9, | | | 2019 REVIEW SUBMITTAL PACKAGE. | | | | | | | | | 1. REMOVE / ABANDON THE STORM PIPE CROSSING THE WEST | | | END OF 4TH STREET IF THE STORM PIPE IS NOT NEEDED. | | | | | | 2. COORDINATE THE RIM/GRATE ELEVATIONS OF DRAINAGE | | | STRUCTURES WITH THE GRADING PLAN. THERE ARE MANY PLACES | | | WHERE THE RIM ELEVATION IS TOO LOW COMPARED TO A | | | PROPOSED SPOT GRADE ELEVATION 5 FEET AWAY. | | | | | | 3. SPECIFY WHAT THE SPOT GRADES REPRESENT - TOP OF | | | CURB, EDGE OF PAVEMENT, SIDEWALK, ETC. | | | | | | 4. GRADE THE PLAZAS TO DRAIN TO ONSITE DRAINAGE SYSTEM | | | INSTEAD OF FLOWING INTO RIGHT-OF-WAY. (REPEAT COMMENT) | | | | | | 5. SECTIONS C-C AND F-F SHOW VALLEY GUTTER BUT THESE | | | GUTTERS DO NOT APPEAR ON THE GRADING PLAN. (REPEAT | | | COMMENT) | | | | | | 6. CONFIRM CURBING AND PAVEMENT WIDTH FOR SECTION D-D. | | | (REPEAT COMMENT) | | | | | | 7. LABEL THE DRAINAGE PIPE SIZE CONNECTED TO STRUCTURE | | | S-401. | | | | | | 8. CONFIRM SE INVERT OF 0.00 SHOWN FOR STRUCTURE S-104. | | | ALSO SHOW THE PIPE. | | | | | | 9. WHY TWO OUTFALL PIPES (EAST AND SOUTH) AT STRUCTURE | | | S-201? CONFIRM THERE IS A DRAINAGE MANHOLE TO THE EAST | | | OF STRUCTURE S-201. | | | | | | 10. SHOW CORRECT PIPE CONNECTIVITY FOR DRAINAGE | | | STRUCTURES ON DIXIE HWY AND 4TH STREET. | | | | | | 11. PROVIDE VIDEO OF EXISTING STORM PIPES ON 4TH | | | STREET. SOME PIPES MAY BE VCP. | | | | | | 12. ADD VERTICAL DATUM REFERENCE AND CONVERSION | | | EQUATION TO NGVD1929 ON EVERY SHEET WITH ELEVATION | | | DATA. | | | | | | 13. ADD THE CONVERSION EQUATION TO NGVD1929 TO GENERAL | | | NOTE #7 ON THE COVER SHEET. | | | | | | 14. CALL OUT THE TYPE OF CURB RAMPS AND ADA MATS FOR | | | DRIVEWAYS CROSSING SIDEWALK ON 4TH STREET. | | | | | | 15. PROVIDE MINIMUM 5 FEET OF HORIZONTAL CLEARANCE | | | BETWEEN SANITARY LATERALS AND DRAINAGE STRUCTURES IN | | | THE RIGHT-OF-WAY. | | | | | | 16. RELOCATE EXFILTRATION TRENCHES FROM UNDER PLANTER | | | AREAS. | | | | | | 17. INTERCEPT STORMWATER RUNOFF AT ALL DRIVEWAYS AND | | | CONVEY TO INTERNAL DRAINAGE SYSTEM. | | | | | | 18. BETWEEN TYPICAL SECTIONS C AND B, THE INTERNAL | | | DRIVE GOES FROM INVERTED CROWN TO NORMAL CROWN. HOW IS | | | THE STORMWATER RUNOFF COLLECTED? | | | | | | 19. WAS CONSIDERATION MADE TO CONNECT STRUCTURE S-302 | | | AND S-108 AND ELIMINATE THE PIPE BETWEEN STRUCTURES | | | S-301 AND S-201? | | | | | | 20. PROVIDE A DETAIL OF THE CONTROL STRUCTURE SHOWING | | | STRUCTURE DIMENSIONS, WHERE THE PIPES ARE COMING INTO | | | THE STRUCTURE, WHERE THE WEIR WILL BE LOCATED AND | | | ELEVATIONS OF THE INVERTS AND WEIR OVERFLOW. | | | | | | 21. HOW WILL THE LOADING DOCK DRAIN? | | | | | | 22. SHOW UTILITIES (INCLUDING EXFILTRATION TRENCHES) ON | | | THE LANDSCAPE PLANS. | | | | | | 23. CIVIL PLAN 5 SIGNING AND MARKING PLAN: | | | A. PARKING DIMENSIONS DO NOT LINE UP WITH THE STRIPING | | | ON 4TH STREET. | | | B. NEED TO CALLOUT STRIPING ON N. DIXIE HWY. | | | C. CALLOUT CROSSWALK STRIPING. | | | D. RIGHT TURN ONLY SIGN FOR DRIVEWAY TO QUADRILLE BLVD. | | | E. RIGHT TURN ARROW STRIPING FOR DRIVEWAY TO N. DIXIE | | | HWY. | | | | | | 24. ANY OFFSITE ENGINEERING PLANS? | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | [email protected] | | | 561-494-1120 | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
4 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
3 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
F |
Date |
05-01-2017 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
05-01-2017 |
Time |
16:26 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
05-01-2017 |
Time |
16:27 |
Sent To |
|
|
| Notes |
| 2017-05-01 08:10:48 | COMMENTS FROM FIRST REVIEW HAVE BEEN ADDRESSED. THE | | | COMMENTS BELOW ARE FROM THE CONCEPTUAL LEVEL REVIEW OF | | | THE APRIL 13, 2017 REVIEW SUBMITTAL PACKAGE. | | | | | | 1. CIVIL PLAN 2 SITE DEMOLITION PLAN: | | | A. STORM PIPE ENTERING NORTH SIDE OF EXISTING DRAINAGE | | | STRUCTURE AT NE CORNER OF QUADRILLE BLVD AND 4TH ST | | | WILL BE IN CONFLICT WITH THE PROPOSED DRAINAGE | | | STRUCTURE S-106. | | | B. EXISTING WATE SERVICES TO BE ABANDONED ARE TO BE | | | REMOVED BACK TO THE MAIN. | | | C. EXISTING SEWER LATERALS TO BE ABANDONED ARE TO BE | | | REMOVED BACK TO THE MAIN AND THE WYE PLUGGED AT THE | | | MAIN. | | | | | | 2. CONFIRM IF THE EXISTING STORM STRUCTURE AT NE CORNER | | | OF QUADRILLE BLVD AND 4TH ST WILL STILL BE NEEDED. IF | | | NOT, THIS STRUCTURE AND THE STORM PIPE CROSSING UNDER | | | 4TH ST WILL NEED TO BE REMOVED. | | | | | | 3. CHECK GRADING FLOW ARROWS FOR DRIVEWAY TO 4TH | | | STREET. STRUCTURE S-108 HAS A RIM ELEVATION OF 14.00 | | | FEET NGVD. SPOT GRADE ON DRIVEWAY TO THE NORTH IS 13.50 | | | FEET NGVD. | | | | | | 4. CHECK GRADING OF DRIVEWAY TO DIXIE HWY. TRENCH DRAIN | | | AT PROPERTY LINE IS AT ELEVATION 12.25 FEET NGVD. SPOT | | | GRADE AT INTERIOR DRIVE TO THE WEST IS ALSO AT | | | ELEVATION 12.25 FEET NGVD. | | | | | | 5. GRADE THE PLAZAS TO DRAIN TO ONSITE DRAINAGE SYSTEM | | | INSTEAD OF FLOWING INTO RIGHT-OF-WAY. | | | | | | 6. SECTIONS C-C AND F-F SHOW VALLEY GUTTER BUT THESE | | | GUTTERS DO NOT APPEAR ON THE GRADING PLAN. | | | | | | 7. CONFIRM CURBING AND PAVEMENT WIDTH FOR SECTION D-D. | | | | | | 8. CIVIL PLAN 5 SIGNING AND MARKING PLAN: | | | A. MISSING STOP SIGN AT WEST END OF 4TH STREET. | | | B. MISSING RIGHT TURN ONLY SIGN FOR DRIVEWAY ONTO | | | QUADRILLE BLVD. | | | C. DIMENSION THE LENGTHS OF DOUBLE YELLOW STRIPES | | | WITHIN THE RIGHT OF WAY. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | [email protected] | | | 561-494-1120 | | | | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
03-08-2017 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
03-08-2017 |
Time |
12:34 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
03-08-2017 |
Time |
12:34 |
Sent To |
|
|
| Notes |
| 2017-03-08 12:34:40 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT | | | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT HTTP:// | | | WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PER | | | MITS-APPLICATIONS | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. PRELIMINARY, UPDATED FEMA FLOOD INSURANCE MAPS ARE | | | AVAILABLE AT | | | HTTP://MAPS.CO.PALM-BEACH.FL.US/GIS/FLOODZONES.ASPX?. | | | PLEASE REVIEW THE MAPS AND VERIFY THAT THE NEW MAPS | | | WILL NOT IMPACT THE PROPOSED PROJECT. | | | | | | 2. THE FREEBOARD REQUIREMENT FOR STRUCTURES IN A | | | SPECIAL FLOOD HAZARD AREA IS ONE FOOT ABOVE BASE FLOOD | | | ELEVATION. | | | | | | 3. PROVIDE ENGINEERING PLANS FOR WORK WITH IN THE 4TH | | | STREET RIGHT-OF-WAY. | | | | | | 4. CONSIDER MOVING WEIRS TO DRAINAGE STRUCTURE S-201. | | | | | | 5. MOVE ONSITE EXFILTRATION TRENCH ALONG N. DIXIE | | | HIGHWAY FURTHER INTO THE SITE SO WHEN THE EXFILTRATION | | | TRENCH IS REHABILITATED IN A FEW YEARS, THE | | | CONSTRUCTION WILL NOT ENCROACH INTO DIXIE HIGHWAY | | | RIGHT-OF-WAY. | | | | | | 6. STORM MANHOLE S-106 APPEARS TO BE LOCATED IN THE | | | RIGHT-OF-WAY OF QUADRILLE BLVD. | | | | | | 7. QUADRILLE BLVD IS MAINTAINED BY FDOT. APPROVAL FROM | | | FDOT WILL BE NEEDED FOR WORK WITHIN THE RIGHT-OF-WAY. | | | | | | 8. WHAT IS THE PHASING OF THE 4TH STREET UTILITY | | | CONSTRUCTION AND ROAD DEMOLITION. THE WATER AND SEWER | | | PLAN SHOWS A PROPOSED SEWER LATERAL RUNNING THROUGH AN | | | EXISTING DRAINAGE INLET AT THE EAST END OF 4TH STREET. | | | | | | 9. THE PROPOSED WEIR ELEVATION IS 11.00 FT NGVD. THE | | | GRATE ELEVATION IS 12.25 FOR THE PROPOSED TRENCH DRAIN | | | ACROSS THE DRIVEWAY ON N. DIXIE HIGHWAY. SUBMIT THE | | | HYDRAULIC GRADE LINE FOR THE DRAINAGE SYSTEM FOR THE | | | 25-YEAR 3-DAY STORM DEMONSTRATING THE HGL IS BELOW THE | | | TRENCH GRATE ELEVATION. | | | | | | 10. DO NOT SHOW TYPE ?F? CURB AND GUTTER ON THE | | | DRIVEWAY APRON TO DIXIE HIGHWAY. | | | | | | 11. WOOD POWER POLE ENCROACHING ON DIXIE HWY DRIVEWAY | | | APRON. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL | | | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. | | | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS | | | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE | | | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS | | | | | | 2. PROVIDE ENGINEERING CALCULATIONS SIGNED AND SEALED | | | BY A FLORIDA REGISTERED PROFESSIONAL ENGINEER FOR THE | | | MINIMUM REQUIRED STORM RUNOFF WATER QUALITY TREATMENT | | | AND PEAK FLOOD STAGES FOR 5-YEAR 1-DAY, 25-YEAR 3-DAY | | | AND 100-YEAR 3-DAY DESIGN STORMS PER SFWMD CRITERIA. | | | | | | 3. PROVIDE A COPY OF THE SFWMD ERP FOR THIS PROPOSED | | | DEVELOPMENT. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
P |
Date |
04-25-2017 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
04-25-2017 |
Time |
13:37 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2017-04-25 13:40:40 | PASSED WITH CONDITIONS OF: | | | | | | 1. REPLAT PRIOR TO C.O. | | | 2. MAINTENANCE AGREEMENT FOR ADJACENT RIGHTS OF WAY. | | | 3. APPROVED ENGINEERING DEVELOPMENT PLAN SUBMITTAL. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
03-03-2017 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
03-03-2017 |
Time |
11:01 |
Rev Time |
|
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2017-03-03 11:05:21 | 1. PREVIOUS CONDITIONS OF APPROVAL PERTAINING TO | | | ENGINEERING, UTILITIES, MAINTENANCE AGREEMENTS AND | | | RE-PLAT STILL APPLY. | | | 2. SANITATION COLLECTION WILL NEED APPROVAL FROM PETER | | | BIENIEK, PUBLIC WORKS DIRECTOR. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
9 |
Status |
P |
Date |
11-12-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
11-12-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-11-12 16:38:10 | PASSED, UNDER THE FOLLOWING CONDITIONS OF APPROVAL: | | | 1. CONDUCT TRAFFIC SIGNAL WARRANT ANALYSES AT QUADRILLE | | | BOULEVARD/4TH STREET EVERY YEAR FOR 2 YEARS WHEN THE | | | FOLLOWING CONDITIONS ARE MET: | | | O CO IS ISSUED FOR AT LEAST 50% OF THE PROPOSED | | | RESIDENTIAL UNITS, HOTEL OR GENERAL OFFICE USES, AND | | | THE WESTBOUND APPROACH AT QUADRILLE BOULEVARD/4TH | | | STREET IS OPERATING AT LOS F DURING WEEKDAY AM OR PM | | | PEAK HOUR WHEN ANALYZED USING THE LATEST HIGHWAY | | | CAPACITY MANUAL METHODOLOGY. | | | O CO IS ISSUED FOR AT LEAST 85% OF THE PROPOSED | | | RESIDENTIAL UNITS, HOTEL OR GENERAL OFFICE USES, AND | | | THE WESTBOUND APPROACH AT QUADRILLE BOULEVARD/4TH | | | STREET IS OPERATING AT LOS F DURING WEEKDAY AM OR PM | | | PEAK HOUR WHEN ANALYZED USING THE LATEST HIGHWAY | | | CAPACITY MANUAL METHODOLOGY. | | | O THE LAST CO IS ISSUED FOR THE PROPOSED DEVELOPMENT. | | | 2. THE TRAFFIC SIGNAL ANALYSES SHOULD INCLUDE, AT A | | | MINIMUM, WARRANT 1 EIGHT-HOUR VEHICULAR VOLUME, WARRANT | | | 2 FOUR-HOUR VEHICULAR VOLUME, WARRANT 4 PEDESTRIAN | | | VOLUME, AND WARRANT 7 CRASH EXPERIENCE DOCUMENTED IN | | | THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). | | | THE NECESSARY TRAFFIC AND SAFETY DATA SHOULD BE | | | COLLECTED FOR THE ANALYSES. | | | 3. SHOULD THE REQUEST FOR TRAFFIC SIGNAL BE DENIED, THE | | | DEVELOPMENT SHOULD IMPLEMENT ALTERNATIVE MEASURES TO | | | MITIGATE TRAFFIC CONGESTION AT QUADRILLE BOULEVARD/4TH | | | STREET, INCLUDING BUT NOT LIMITED TO ADDITIONAL TDM | | | MEASURES, WAYFINDING SIGNS TO DIVERT TRIPS TO THE | | | QUADRILLE BOULEVARD/3RD STREET INTERSECTIONS, ETC. IN | | | ADDITION, THE DEVELOPMENT SHOULD, ON CITY?S REQUEST, | | | CONDUCT AN ENGINEERING STUDY FOR A POTENTIAL ENHANCED | | | PEDESTRIAN CROSSWALK CROSSING QUADRILLE BOULEVARD AT | | | 4TH STREET, AND PURSUE SUCH A CROSSWALK APPROVAL WITH | | | FDOT, AND IF APPROVED, CONSTRUCT SUCH ENHANCED | | | CROSSWALK AT THE DEVELOPER?S OWN EXPENSES. | | | 4. PROVIDE SURETY FOR THE CONSTRUCTION OF A TRAFFIC | | | SIGNAL AT QUADRILLE BOULEVARD/4TH STREET UNTIL THE | | | OBLIGATIONS RELATED TO TRAFFIC SIGNAL WARRANT ANALYSES | | | OR SIGNAL CONSTRUCTION (#1, #2 AND #3 ABOVE) ARE FULLY | | | MET. | | | 5. PROVIDE SIDEWALK EASEMENT FOR THE PORTION OF | | | SIDEWALK OUTSIDE RIGHT-OF-WAY. | | | 6. PROVIDE THE CITY A COPY OF THE UPDATED PARKING | | | MANAGEMENT PLAN ANNUALLY, STARTING AT ONE (1) YEAR | | | AFTER CO IS ISSUED FOR AT LEAST 50% OF THE PROPOSED | | | RESIDENTIAL UNITS, HOTEL OR GENERAL OFFICE USES, UNTIL | | | TWO (2) YEARS AFTER THE LAST CO IS ISSUED. THE PARKING | | | MANAGEMENT PLAN SHOULD DOCUMENT THE USAGE AND | | | SPILLBACK, IF ANY, AT THE 4TH STREET VALET STATION, AND | | | ANY MEASURE IMPLEMENTED TO ADDRESS THE SPILLBACK, IF | | | ANY. | | | 7. PROVIDE THE FOLLOWING TDM MEASURES: | | | O AT LEAST 2 PARKING SPACES FOR CAR-SHARING SERVICES | | | O MICROMOBILITY FACILITIES ON-SITE | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
8 |
Status |
P |
Date |
09-29-2020 |
|
|
Cont ID |
|
| Sent By |
|
Date |
09-29-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
09-21-2020 |
Time |
|
Sent To |
|
|
| Notes |
| 2020-09-29 15:50:19 | PASSED, UNDER THE FOLLOWING CONDITIONS OF APPROVAL: | | | | | | 1. CONDUCT TRAFFIC SIGNAL WARRANT ANALYSES AT QUADRILLE | | | BOULEVARD/4TH STREET EVERY YEAR FOR 2 YEARS WHEN THE | | | FOLLOWING CONDITIONS ARE MET: | | | O CO IS ISSUED FOR AT LEAST 50% OF THE PROPOSED | | | RESIDENTIAL UNITS, HOTEL OR GENERAL OFFICE USES, AND | | | THE WESTBOUND APPROACH AT QUADRILLE BOULEVARD/4TH | | | STREET IS OPERATING AT LOS F DURING WEEKDAY AM OR PM | | | PEAK HOUR WHEN ANALYZED USING THE LATEST HIGHWAY | | | CAPACITY MANUAL METHODOLOGY. | | | O CO IS ISSUED FOR AT LEAST 85% OF THE PROPOSED | | | RESIDENTIAL UNITS, HOTEL OR GENERAL OFFICE USES, AND | | | THE WESTBOUND APPROACH AT QUADRILLE BOULEVARD/4TH | | | STREET IS OPERATING AT LOS F DURING WEEKDAY AM OR PM | | | PEAK HOUR WHEN ANALYZED USING THE LATEST HIGHWAY | | | CAPACITY MANUAL METHODOLOGY. | | | O THE LAST CO IS ISSUED FOR THE PROPOSED DEVELOPMENT. | | | 2. THE TRAFFIC SIGNAL ANALYSES SHOULD INCLUDE, AT A | | | MINIMUM, WARRANT 1 EIGHT-HOUR VEHICULAR VOLUME, WARRANT | | | 2 FOUR-HOUR VEHICULAR VOLUME, WARRANT 4 PEDESTRIAN | | | VOLUME, AND WARRANT 7 CRASH EXPERIENCE DOCUMENTED IN | | | THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). | | | THE NECESSARY TRAFFIC AND SAFETY DATA SHOULD BE | | | COLLECTED FOR THE ANALYSES. | | | 3. SHOULD THE REQUEST FOR TRAFFIC SIGNAL BE DENIED, THE | | | DEVELOPMENT SHOULD IMPLEMENT ALTERNATIVE MEASURES TO | | | MITIGATE TRAFFIC CONGESTION AT QUADRILLE BOULEVARD/4TH | | | STREET, INCLUDING BUT NOT LIMITED TO ADDITIONAL TDM | | | MEASURES, WAYFINDING SIGNS TO DIVERT TRIPS TO THE | | | QUADRILLE BOULEVARD/3RD STREET INTERSECTIONS, ETC. IN | | | ADDITION, THE DEVELOPMENT SHOULD, ON CITY?S REQUEST, | | | CONDUCT AN ENGINEERING STUDY FOR A POTENTIAL ENHANCED | | | PEDESTRIAN CROSSWALK CROSSING QUADRILLE BOULEVARD AT | | | 4TH STREET, AND PURSUE SUCH A CROSSWALK APPROVAL WITH | | | FDOT, AND IF APPROVED, CONSTRUCT SUCH ENHANCED | | | CROSSWALK AT THE DEVELOPER?S OWN EXPENSES. | | | 4. PROVIDE SURETY FOR THE CONSTRUCTION OF A TRAFFIC | | | SIGNAL AT QUADRILLE BOULEVARD/4TH STREET UNTIL THE | | | OBLIGATIONS RELATED TO TRAFFIC SIGNAL WARRANT ANALYSES | | | OR SIGNAL CONSTRUCTION (#1, #2 AND #3 ABOVE) ARE FULLY | | | MET. | | | 5. PROVIDE SIDEWALK EASEMENT FOR THE PORTION OF | | | SIDEWALK OUTSIDE RIGHT-OF-WAY. | | | 6. RESERVED PARKING FOR RESIDENTIAL TENANTS, IF | | | IMPLEMENTED, SHALL BE NO MORE THAN 156 PARKING SPACES | | | (IF 1 SPACE PER UNIT) OR 89 PARKING SPACES (IF 2 SPACES | | | PER UNIT) OR EQUIVALENT OR AS AMENDED IN PARKING | | | CALCULATIONS SUCH THAT THE UNRESERVED PARKING SPACES | | | EXCEED THE MINIMUM REQUIRED FOR THE REMAINING USES PER | | | SHARED PARKING CALCULATIONS. RESERVED PARKING SHALL BE | | | IMPLEMENTED ONLY AFTER UNBUNDLED PARKING POLICY IS USED | | | FOR RESIDENTIAL LEASE AND IF THE RESIDENTIAL TENANTS | | | ELECT TO PAY FOR THE PARKING SPACES. | | | 7. PROVIDE THE CITY A COPY OF THE UPDATED PARKING | | | MANAGEMENT PLAN ANNUALLY, STARTING AT ONE (1) YEAR | | | AFTER CO IS ISSUED FOR AT LEAST 50% OF THE PROPOSED | | | RESIDENTIAL UNITS, HOTEL OR GENERAL OFFICE USES, UNTIL | | | TWO (2) YEARS AFTER THE LAST CO IS ISSUED. THE PARKING | | | MANAGEMENT PLAN SHOULD DOCUMENT THE USAGE AND | | | SPILLBACK, IF ANY, AT THE 4TH STREET VALET STATION, AND | | | ANY MEASURE IMPLEMENTED TO ADDRESS THE SPILLBACK, IF | | | ANY. | | | 8. PROVIDE THE FOLLOWING TDM MEASURES: | | | O AT LEAST 2 PARKING SPACES FOR CAR-SHARING SERVICES | | | O MICROMOBILITY FACILITIES ON-SITE | | | O A TROLLEY SHELTER ALONG DIXIE HIGHWAY. THE EXACT | | | LOCATION WILL BE DETERMINED BY THE CITY. | | | O CONTRIBUTION TO THE CITY TROLLEY FUND. AMOUNT TO BE | | | DETERMINED BY THE CITY. | | | O UNBUNDLED PARKING FOR RESIDENTS AND PARKING CASH-OUT | | | PROGRAM FOR EMPLOYEES | | | O TRANSIT PASS SUBSIDY | | | 9. PROVIDE ANNUAL SUMMARY TO THE CITY ON THE USAGE OF | | | THE CAR-SHARING, UNBUNDLED PARKING AND PARKING CASH-OUT | | | PROGRAM, AND TRANSIT PASS SUBSIDY BY DECEMBER 31ST OF | | | EACH YEAR. | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
7 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
02-13-2020 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2020-02-13 12:10:54 | PASSED, BUT PLEASE REVISE THE SITE DATA TABLE PER | | | COMMENT BELOW. ALSO SEE CONDITION #7 ON RESERVED | | | PARKING SPACES. | | | 1. PLEASE REVIEW AND REVISE THE SITE DATA (SHEET A0.01) | | | AND PARKING DATA (A0.06) SHEETS AS THEY CONTAIN | | | INCONSISTENT INFORMATION IN TERMS OF NUMBER OF UNITS | | | AND PARKING CALCULATIONS. ALSO, IT APPEARS THAT 230 | | | RESIDENTIAL UNITS ARE PROVIDED BUT THE PARKING | | | CALCULATION ONLY INCLUDED 225 UNITS. | | | | | | | | | CONDITIONS OF APPROVAL: | | | 1. CONDUCT TRAFFIC SIGNAL WARRANT ANALYSES AT QUADRILLE | | | BOULEVARD/4TH STREET EVERY YEAR FOR 2 YEARS WHEN THE | | | FOLLOWING CONDITIONS ARE MET: | | | O CO IS ISSUED FOR AT LEAST 50% OF THE PROPOSED | | | RESIDENTIAL UNITS, HOTEL OR GENERAL OFFICE USES, AND | | | THE WESTBOUND APPROACH AT QUADRILLE BOULEVARD/4TH | | | STREET IS OPERATING AT LOS F DURING WEEKDAY AM OR PM | | | PEAK HOUR WHEN ANALYZED USING THE LATEST HIGHWAY | | | CAPACITY MANUAL METHODOLOGY. | | | O CO IS ISSUED FOR AT LEAST 85% OF THE PROPOSED | | | RESIDENTIAL UNITS, HOTEL OR GENERAL OFFICE USES, AND | | | THE WESTBOUND APPROACH AT QUADRILLE BOULEVARD/4TH | | | STREET IS OPERATING AT LOS F DURING WEEKDAY AM OR PM | | | PEAK HOUR WHEN ANALYZED USING THE LATEST HIGHWAY | | | CAPACITY MANUAL METHODOLOGY. | | | O THE LAST CO IS ISSUED FOR THE PROPOSED DEVELOPMENT. | | | 2. THE TRAFFIC SIGNAL ANALYSES SHOULD INCLUDE, AT A | | | MINIMUM, WARRANT 1 EIGHT-HOUR VEHICULAR VOLUME, WARRANT | | | 2 FOUR-HOUR VEHICULAR VOLUME, WARRANT 4 PEDESTRIAN | | | VOLUME, AND WARRANT 7 CRASH EXPERIENCE DOCUMENTED IN | | | THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). | | | THE NECESSARY TRAFFIC AND SAFETY DATA SHOULD BE | | | COLLECTED FOR THE ANALYSES. | | | 3. SHOULD THE REQUEST FOR TRAFFIC SIGNAL BE DENIED, THE | | | DEVELOPMENT SHOULD IMPLEMENT ALTERNATIVE MEASURES TO | | | MITIGATE TRAFFIC CONGESTION AT QUADRILLE BOULEVARD/4TH | | | STREET, INCLUDING BUT NOT LIMITED TO ADDITIONAL TDM | | | MEASURES, WAYFINDING SIGNS TO DIVERT TRIPS TO THE | | | QUADRILLE BOULEVARD/3RD STREET INTERSECTIONS, ETC. IN | | | ADDITION, THE DEVELOPMENT SHOULD, ON CITY'S REQUEST, | | | CONDUCT AN ENGINEERING STUDY FOR A POTENTIAL ENHANCED | | | PEDESTRIAN CROSSWALK CROSSING QUADRILLE BOULEVARD AT | | | 4TH STREET, AND PURSUE SUCH A CROSSWALK APPROVAL WITH | | | FDOT, AND IF APPROVED, CONSTRUCT SUCH ENHANCED | | | CROSSWALK AT THE DEVELOPER'S OWN EXPENSES. | | | 4. PROVIDE SURETY FOR THE CONSTRUCTION OF A TRAFFIC | | | SIGNAL AT QUADRILLE BOULEVARD/4TH STREET UNTIL THE | | | OBLIGATIONS RELATED TO TRAFFIC SIGNAL WARRANT ANALYSES | | | OR SIGNAL CONSTRUCTION (#1, #2 AND #3 ABOVE) ARE FULLY | | | MET. | | | 5. PROVIDE SIDEWALK EASEMENT FOR THE PORTION OF | | | SIDEWALK OUTSIDE RIGHT-OF-WAY. | | | 6. RESERVED PARKING FOR RESIDENTIAL TENANTS, IF | | | IMPLEMENTED, SHALL BE NO MORE THAN 156 PARKING SPACES | | | (IF 1 SPACE PER UNIT) OR 89 PARKING SPACES (IF 2 SPACES | | | PER UNIT) OR EQUIVALENT OR AS AMENDED IN PARKING | | | CALCULATIONS SUCH THAT THE UNRESERVED PARKING SPACES | | | EXCEED THE MINIMUM REQUIRED FOR THE REMAINING USES PER | | | SHARED PARKING CALCULATIONS. RESERVED PARKING SHALL BE | | | IMPLEMENTED ONLY AFTER UNBUNDLED PARKING POLICY IS USED | | | FOR RESIDENTIAL LEASE AND IF THE RESIDENTIAL TENANTS | | | ELECT TO PAY FOR THE PARKING SPACES. | | | 7. PROVIDE THE CITY A COPY OF THE UPDATED PARKING | | | MANAGEMENT PLAN ANNUALLY, STARTING AT ONE (1) YEAR | | | AFTER CO IS ISSUED FOR AT LEAST 50% OF THE PROPOSED | | | RESIDENTIAL UNITS, HOTEL OR GENERAL OFFICE USES, UNTIL | | | TWO (2) YEARS AFTER THE LAST CO IS ISSUED. THE PARKING | | | MANAGEMENT PLAN SHOULD DOCUMENT THE USAGE AND | | | SPILLBACK, IF ANY, AT THE 4TH STREET VALET STATION, AND | | | ANY MEASURE IMPLEMENTED TO ADDRESS THE SPILLBACK, IF | | | ANY. | | | 8. PROVIDE THE FOLLOWING TDM MEASURES: | | | O AT LEAST 2 PARKING SPACES FOR CAR-SHARING SERVICES | | | O MICROMOBILITY FACILITIES ON-SITE | | | O A TROLLEY SHELTER ALONG DIXIE HIGHWAY. THE EXACT | | | LOCATION WILL BE DETERMINED BY THE CITY. | | | O CONTRIBUTION TO THE CITY TROLLEY FUND. AMOUNT TO BE | | | DETERMINED BY THE CITY. | | | O UNBUNDLED PARKING FOR RESIDENTS AND PARKING CASH-OUT | | | PROGRAM FOR EMPLOYEES | | | O TRANSIT PASS SUBSIDY | | | 9. PROVIDE ANNUAL SUMMARY TO THE CITY ON THE USAGE OF | | | THE CAR-SHARING, UNBUNDLED PARKING AND PARKING CASH-OUT | | | PROGRAM, AND TRANSIT PASS SUBSIDY BY DECEMBER 31ST OF | | | EACH YEAR. | | | | | | | | | SHING TSOI | | | CITY IN-HOUSE TRAFFIC CONSULTANT | | | 561-494-1141 | | | [email protected] | | | (IN-HOUSE ON TUESDAYS AND WEDNESDAYS) |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
6 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
09-17-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2019-09-17 12:12:36 | PASSED, WITH CONDITIONS OF APPROVAL: | | | 1. PROVIDE LANDSCAPED RAISED MEDIAN BETWEEN 4TH STREET | | | AND DIXIE HIGHWAY ON QUADRILLE BOULEVARD. THE MEDIAN | | | DESIGN SHOULD PREVENT WESTBOUND VEHICLES FROM MAKING | | | LEFT-TURNS FROM THE DRIVEWAY. COORDINATE WITH FDOT ON | | | THE TURN LANE REQUIREMENTS AT QUADRILLE BOULEVARD/4TH | | | STREET, THE SITE DRIVEWAY, AND EASTBOUND LEFT-TURN AT | | | QUADRILLE BOULEVARD/DIXIE HIGHWAY. | | | 2. CONDUCT TRAFFIC SIGNAL WARRANT ANALYSES AT QUADRILLE | | | BOULEVARD/4TH STREET EVERY YEAR FOR 2 YEARS WHEN THE | | | FOLLOWING CONDITIONS ARE MET: | | | O CO IS ISSUED FOR AT LEAST 50% OF THE PROPOSED | | | RESIDENTIAL UNITS, HOTEL OR GENERAL OFFICE USES, AND | | | THE WESTBOUND APPROACH AT QUADRILLE BOULEVARD/4TH | | | STREET IS OPERATING AT LOS F DURING WEEKDAY AM OR PM | | | PEAK HOUR WHEN ANALYZED USING THE LATEST HIGHWAY | | | CAPACITY MANUAL METHODOLOGY. | | | O CO IS ISSUED FOR AT LEAST 85% OF THE PROPOSED | | | RESIDENTIAL UNITS, HOTEL OR GENERAL OFFICE USES, AND | | | THE WESTBOUND APPROACH AT QUADRILLE BOULEVARD/4TH | | | STREET IS OPERATING AT LOS F DURING WEEKDAY AM OR PM | | | PEAK HOUR WHEN ANALYZED USING THE LATEST HIGHWAY | | | CAPACITY MANUAL METHODOLOGY. | | | O THE LAST CO IS ISSUED FOR THE PROPOSED DEVELOPMENT. | | | 3. THE TRAFFIC SIGNAL ANALYSES SHOULD INCLUDE, AT A | | | MINIMUM, WARRANT 1 EIGHT-HOUR VEHICULAR VOLUME, WARRANT | | | 2 FOUR-HOUR VEHICULAR VOLUME, WARRANT 4 PEDESTRIAN | | | VOLUME, AND WARRANT 7 CRASH EXPERIENCE DOCUMENTED IN | | | THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). | | | THE NECESSARY TRAFFIC AND SAFETY DATA SHOULD BE | | | COLLECTED FOR THE ANALYSES. | | | 4. SHOULD THE REQUEST FOR TRAFFIC SIGNAL BE DENIED, THE | | | DEVELOPMENT SHOULD IMPLEMENT ALTERNATIVE MEASURES TO | | | MITIGATE TRAFFIC CONGESTION AT QUADRILLE BOULEVARD/4TH | | | STREET, INCLUDING BUT NOT LIMITED TO ADDITIONAL TDM | | | MEASURES, WAYFINDING SIGNS TO DIVERT TRIPS TO THE | | | QUADRILLE BOULEVARD/3RD STREET INTERSECTIONS, ETC. IN | | | ADDITION, THE DEVELOPMENT SHOULD, ON CITY'S REQUEST, | | | CONDUCT AN ENGINEERING STUDY FOR A POTENTIAL ENHANCED | | | PEDESTRIAN CROSSWALK CROSSING QUADRILLE BOULEVARD AT | | | 4TH STREET, AND PURSUE SUCH A CROSSWALK APPROVAL WITH | | | FDOT, AND IF APPROVED, CONSTRUCT SUCH ENHANCED | | | CROSSWALK AT THE DEVELOPER'S OWN EXPENSES. | | | 5. PROVIDE SURETY FOR THE CONSTRUCTION OF A TRAFFIC | | | SIGNAL AT QUADRILLE BOULEVARD/4TH STREET UNTIL THE | | | OBLIGATIONS RELATED TO TRAFFIC SIGNAL WARRANT ANALYSES | | | OR SIGNAL CONSTRUCTION (#3, #4 AND #5 ABOVE) ARE FULLY | | | MET. | | | 6. PROVIDE SIDEWALK EASEMENT FOR THE PORTION OF | | | SIDEWALK OUTSIDE RIGHT-OF-WAY. | | | 7. PLEASE REPLACE OR RESET THE PAVERS AT THE DIXIE | | | HIGHWAY/4TH STREET INTERSECTION AS THE PAVERS WILL BE | | | IMPACTED DURING MILLING AND RESURFACING. | | | 8. NO RESERVED PARKING IS ALLOWED FOR ANY TENANT SINCE | | | THE NUMBER OF PROVIDED PARKING SPACES IS AT THE MINIMUM | | | ALLOWED WITH SHARED PARKING. | | | 9. PROVIDE THE CITY A COPY OF THE UPDATED PARKING | | | MANAGEMENT PLAN ANNUALLY, STARTING AT ONE (1) YEAR | | | AFTER CO IS ISSUED FOR AT LEAST 50% OF THE PROPOSED | | | RESIDENTIAL UNITS, HOTEL OR GENERAL OFFICE USES, UNTIL | | | TWO (2) YEARS AFTER THE LAST CO IS ISSUED. THE PARKING | | | MANAGEMENT PLAN SHOULD DOCUMENT THE USAGE AND | | | SPILLBACK, IF ANY, AT THE 4TH STREET VALET STATION, AND | | | ANY MEASURE IMPLEMENTED TO ADDRESS THE SPILLBACK, IF | | | ANY. | | | 10. PROVIDE THE FOLLOWING TDM MEASURES: | | | O AT LEAST 2 PARKING SPACES FOR CAR-SHARING SERVICES | | | O BIKE SHARING STATIONS, MICROMOBILITY FACILITIES OR | | | SCOOTER RACKS | | | O A TROLLEY SHELTER ALONG DIXIE HIGHWAY. THE EXACT | | | LOCATION WILL BE DETERMINED BY THE CITY. | | | O CONTRIBUTION TO THE CITY TROLLEY FUND. AMOUNT TO BE | | | DETERMINED BY THE CITY. | | | O UNBUNDLED PARKING FOR RESIDENTS AND PARKING CASH-OUT | | | PROGRAM FOR EMPLOYEES | | | O TRANSIT PASS SUBSIDY | | | 11. PROVIDE ANNUAL SUMMARY TO THE CITY ON THE USAGE OF | | | THE CAR-SHARING, UNBUNDLED PARKING AND PARKING CASH-OUT | | | PROGRAM, AND TRANSIT PASS SUBSIDY BY DECEMBER 31ST OF | | | EACH YEAR. | | | | | | | | | SHING TSOI | | | CITY IN-HOUSE TRAFFIC CONSULTANT | | | 561-494-1141 | | | [email protected] | | | (IN-HOUSE ON TUESDAYS AND WEDNESDAYS) |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
5 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
04-23-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2019-04-23 10:25:20 | 1. PROVIDE COUNTY TPS LETTER. | | | 2. IN ADDITION TO BEING A TAXI/RIDESHARING | | | PICKUP/DROPOFF, PLEASE CLARIFY WHEN THE VALET STATION | | | IN THE INTERNAL DRIVE AISLE WILL BE USED AND BY WHICH | | | TYPES OF USERS. | | | 3. WOULD TAXI/RIDESHARING PICKUP/DROPOFF FOR HOTEL | | | GUESTS BE LOCATED AT THE INTERNAL DRIVE AISLE VALET | | | STATION, AND THE 4TH STREET VALET STATION WOULD NOT | | | ALLOW TAXI/RIDESHARING PICKUP/DROPOFF? IF SO, | | | WAYFINDING SIGNAGE WOULD BE NEEDED TO PROVIDE CLEAR | | | DIRECTIONS TO HOTEL GUESTS. | | | 4. THE TRAFFIC STUDY INDICATES THAT 5 VALET ATTENDANTS | | | ARE NEEDED AT THE 4TH STREET VALET STATION, BUT THE | | | PARKING MANAGEMENT PLAN INDICATES THAT A MAXIMUM OF 6 | | | VALET ATTENDANTS ARE NEEDED FOR THE ENTIRE SITE. THIS | | | LEAVES 1 VALET ATTENDANT FOR THE OTHER 3 VALET | | | STATIONS. PLEASE CLARIFY THE NUMBER OF VALET ATTENDANTS | | | NEEDED. | | | 5. IN THE PARKING MANAGEMENT PLAN, THE PARKING | | | ACCUMULATION CALCULATION REPRESENTS THE NUMBER OF | | | OCCUPIED PARKING SPACES AT ANY GIVEN TIME, WHICH DOES | | | NOT REPRESENT THE NUMBER OF VEHICLE ARRIVALS AND | | | DEPARTURES. THE NUMBER OF VEHICLE ARRIVALS AND | | | DEPARTURES ARE DOCUMENTED IN THE VEHICULAR TRIP | | | GENERATION IN THE TRAFFIC STUDY, WHICH SHOWS AN AM PEAK | | | HOUR TRIPS OF 395 (258 IN / 137 OUT) AND PM PEAK HOUR | | | TRIPS OF 437 (163 IN / 275 OUT). | | | 6. THE PARKING MANAGEMENT PLAN INDICATES THAT RESIDENTS | | | AND OFFICE TENANTS COULD CHOOSE TO PICK UP THEIR | | | VEHICLES EITHER INSIDE THE GARAGE OR AT THE 4TH STREET | | | VALET STATION. COULD RESIDENTS AND OFFICE TENANTS BE | | | RESTRICTED (THROUGH THE PROPOSED EMAIL/TEXT MESSAGE | | | SYSTEM) TO PICK UP THEIR VEHICLES AT VALET STATIONS | | | INSIDE THE GARAGE DURING PEAK HOUR OR DYNAMICALLY BASED | | | ON THE DEMAND AND CONGESTION LEVEL AT THE 4TH STREET | | | VALET STATION? | | | 7. CLARIFY IF THE ASSUMED 2.5-MINUTE VALET RUNNING TIME | | | IS REASONABLE, GIVEN 33% OF PARKING SPACES ARE TANDEM | | | PARKING SPACES, 31% OF PARKING SPACES ARE PARKING LIFTS | | | WITH SOME BEING TANDEM PARKING LIFTS, AND THE POTENTIAL | | | FOR VALET ATTENDANTS TO DRIVE 5 FLOORS DOWN THE GARAGE. | | | 8. WHAT BACKUP PLANS ARE IN PLACE SHOULD THE PARKING | | | LIFT MALFUNCTION AND THE VALET ATTENDANTS ARE UNABLE TO | | | RETRIEVE VEHICLES ON THE PARKING LIFTS? | | | 9. WHAT MEASURES ARE IN PLACE TO DIFFERENTIATE BETWEEN | | | COMMERCIAL PATRONS, HOTEL GUESTS, OFFICE TENANTS AND | | | RESIDENTS TO MAKE SURE THEY DROP OFF VEHICLES AT THE | | | APPROPRIATE VALET STATIONS? | | | 10. ARE COMMERCIAL PATRONS AND HOTEL GUESTS ALLOWED TO | | | SELF PARK? | | | 11. PROVIDE VALET PICK-UP/DROP-OFF CIRCULATION ROUTES | | | FOR EACH VALET STATION, AS WELL AS THE UBER/LYFT | | | CIRCULATION ROUTES. ALSO, PROVIDE AUTOTURN EXHIBITS AT | | | LOCATIONS WITH LIMITED CURB RADII SUCH AS AROUND THE | | | 4TH STREET VALET STATION AND THE EASTERN GARAGE | | | ENTRANCE. | | | 12. THE RESPONSE TO COMMENTS IN THE PARKING MANAGEMENT | | | PLAN INDICATED THAT A SMALL NUMBER OF RESIDENTIAL | | | TENANTS WILL BE OFFERED TWO-TANDEM SPACES AS PART OF | | | THEIR RENTAL AGREEMENT. SINCE THE CURRENT PARKING | | | SUPPLY IS AT THE MINIMUM REQUIRED BY CITY CODE WITH | | | SHARED PARKING, ANY RESERVED PARKING SPACES WOULD | | | RESULT IN CODE VIOLATION AS THOSE RESERVED PARKING | | | SPACES WOULD BE EXCLUDED FROM THE SHARED PARKING | | | CALCULATION. | | | 13. CONSIDERING MOVING ALL OR PART OF THE OUTDOOR BIKE | | | RACKS AND BIKE SHARING STATIONS TO BE UNDER THE CANOPY | | | OR COVER. | | | 14. PROVIDE ADDITIONAL TDM MEASURES INCLUDING THE TDM | | | MEASURES LISTED BELOW, IN ADDITION TO DESIGNATED | | | CAR-SHARING PARKING SPACES, BIKE SHARING STATION, | | | TROLLEY STOP ON DIXIE HIGHWAY AND CONTRIBUTION TO CITY | | | TROLLEY FUND. DETAILS OF THE TDM MEASURES WILL BE | | | DETERMINED BY THE CITY. MONITORING OF THESE TDM | | | MEASURES WILL ALSO BE REQUIRED. | | | O UNBUNDLED PARKING/PARKING CASH-OUT PROGRAM | | | O TRANSIT PASS SUBSIDY | | | | | | THE FOLLOWING ITEMS RELATED TO COMMENTS PROVIDED | | | PREVIOUSLY WILL BE INCLUDED IN THE CONDITIONS OF | | | APPROVAL: | | | 1. PROVIDE LANDSCAPED RAISED MEDIAN BETWEEN 4TH STREET | | | AND DIXIE HIGHWAY ON QUADRILLE BOULEVARD. THE MEDIAN | | | DESIGN SHOULD PREVENT WESTBOUND VEHICLES FROM MAKING | | | LEFT-TURNS FROM THE DRIVEWAY. COORDINATE WITH FDOT ON | | | THE TURN LANE REQUIREMENTS AT QUADRILLE BOULEVARD/4TH | | | STREET, THE SITE DRIVEWAY, AND EASTBOUND LEFT-TURN AT | | | QUADRILLE BOULEVARD/DIXIE HIGHWAY. | | | 2. PURSUE WITH FDOT ON ELIMINATING THE EXCLUSIVE | | | RIGHT-TURN LANE REQUIREMENT ON QUADRILLE BOULEVARD. THE | | | CITY WILL PROVIDE A LETTER OF SUPPORT TO THE APPLICANT. | | | 3. CONDUCT TRAFFIC SIGNAL WARRANT ANALYSES AT QUADRILLE | | | BOULEVARD/4TH STREET EVERY YEAR FOR 2 YEARS WHEN THE | | | FOLLOWING CONDITIONS ARE MET: | | | O CO IS ISSUED FOR AT LEAST 50% OF THE PROPOSED | | | RESIDENTIAL UNITS, HOTEL OR GENERAL OFFICE USES, AND | | | THE WESTBOUND APPROACH AT QUADRILLE BOULEVARD/4TH | | | STREET IS OPERATING AT LOS F DURING WEEKDAY AM OR PM | | | PEAK HOUR WHEN ANALYZED USING THE LATEST HIGHWAY | | | CAPACITY MANUAL METHODOLOGY. | | | O CO IS ISSUED FOR AT LEAST 85% OF THE PROPOSED | | | RESIDENTIAL UNITS, HOTEL OR GENERAL OFFICE USES, AND | | | THE WESTBOUND APPROACH AT QUADRILLE BOULEVARD/4TH | | | STREET IS OPERATING AT LOS F DURING WEEKDAY AM OR PM | | | PEAK HOUR WHEN ANALYZED USING THE LATEST HIGHWAY | | | CAPACITY MANUAL METHODOLOGY. | | | O THE LAST CO IS ISSUED FOR THE PROPOSED DEVELOPMENT. | | | 4. THE TRAFFIC SIGNAL ANALYSES SHOULD INCLUDE, AT A | | | MINIMUM, WARRANT 1 EIGHT-HOUR VEHICULAR VOLUME, WARRANT | | | 2 FOUR-HOUR VEHICULAR VOLUME, WARRANT 4 PEDESTRIAN | | | VOLUME, AND WARRANT 7 CRASH EXPERIENCE DOCUMENTED IN | | | THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). | | | THE NECESSARY TRAFFIC AND SAFETY DATA SHOULD BE | | | COLLECTED FOR THE ANALYSES. | | | 5. SHOULD THE REQUEST FOR TRAFFIC SIGNAL BE DENIED, THE | | | DEVELOPMENT SHOULD IMPLEMENT ALTERNATIVE MEASURES TO | | | MITIGATE TRAFFIC CONGESTION AT QUADRILLE BOULEVARD/4TH | | | STREET, INCLUDING BUT NOT LIMITED TO ADDITIONAL TDM | | | MEASURES, WAYFINDING SIGNS TO DIVERT TRIPS TO THE | | | QUADRILLE BOULEVARD/3RD STREET INTERSECTIONS, ETC. IN | | | ADDITION, THE DEVELOPMENT SHOULD, ON CITY?S REQUEST, | | | CONDUCT AN ENGINEERING STUDY FOR A POTENTIAL ENHANCED | | | PEDESTRIAN CROSSWALK CROSSING QUADRILLE BOULEVARD AT | | | 4TH STREET, AND PURSUE SUCH A CROSSWALK APPROVAL WITH | | | FDOT, AND IF APPROVED, CONSTRUCT SUCH ENHANCED | | | CROSSWALK AT THE DEVELOPER?S OWN EXPENSES. | | | 6. PROVIDE SURETY FOR THE CONSTRUCTION OF A TRAFFIC | | | SIGNAL AT QUADRILLE BOULEVARD/4TH STREET UNTIL THE | | | OBLIGATIONS RELATED TO TRAFFIC SIGNAL WARRANT ANALYSES | | | OR SIGNAL CONSTRUCTION (#3, #4 AND #5 ABOVE) ARE FULLY | | | MET. | | | 7. PROVIDE SIDEWALK EASEMENT FOR THE PORTION OF | | | SIDEWALK OUTSIDE RIGHT-OF-WAY. | | | 8. PLEASE REPLACE OR RESET THE PAVERS AT THE DIXIE | | | HIGHWAY/4TH STREET INTERSECTION AS THE PAVERS WILL BE | | | IMPACTED DURING MILLING AND RESURFACING. | | | 9. A TROLLEY STOP ALONG DIXIE HIGHWAY WILL BE REQUIRED | | | AS PART OF THE TDM MEASURES. THE EXACT LOCATION WILL BE | | | DETERMINED BY THE CITY. | | | | | | SHING TSOI | | | CITY IN-HOUSE TRAFFIC CONSULTANT | | | 561-494-1141 | | | [email protected] | | | (IN-HOUSE ON TUESDAYS AND WEDNESDAYS) |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
4 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
3 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
02-13-2019 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2019-02-13 15:11:31 | 1. PROVIDE COUNTY TPS LETTER. | | | 2. APPROXIMATELY TWO-THIRD OF THE PARKING SPACES ARE | | | EITHER TANDEM OR PARKING LIFTS. CLARIFY IF THESE | | | PARKING SPACES ARE USED BY VALET ONLY. THE TRAFFIC | | | STUDY ASSUMED ONLY 20% OF TRIPS ARE USING VALET. | | | 3. THE VALET LANES ON 4TH STREET MAY NOT PROVIDE | | | SUFFICIENT STORAGE FOR VEHICLES. VALET QUEUE LENGTH OF | | | 6 VEHICLES REQUIRES THE SECOND VALET LANE BE OCCUPIED, | | | WHICH MAY BLOCK OTHER EGRESS VEHICLES. ALLOWING | | | UBER/LYFT IN THE VALET LANES MAY WORSEN THE ISSUES AS | | | UBER/LYFT VEHICLES MAY OCCUPY THE VALET LANES FOR A | | | LONGER TIME DURING PICK-UP. VEHICLES BACKUP ON THE | | | WESTBOUND APPROACH OF QUADRILLE BOULEVARD/4TH STREET | | | MAY BLOCK EGRESS VEHICLES AND FURTHER EXACERBATE THE | | | ISSUES. PLEASE ALSO VERIFY THE PERCENTAGE OF VALET | | | TRIPS IS CONSISTENT WITH THE TYPE OF PARKING SPACES | | | PROVIDED. | | | 4. PROVIDE A VALET OPERATION MANAGEMENT PLAN TO DISCUSS | | | THE DETAILED OPERATIONS OF THE VALET, AND HOW THE QUEUE | | | ISSUES COULD BE ADDRESSED SHOULD THEY ARISE. THE PLAN | | | SHOULD DISCUSS THE RUNNING TIME, ROUTE, AND NUMBER OF | | | VALET STAFF, AS WELL AS THE PLAN OF ACTION SHOULD THE | | | VALET LANE EGRESS IS BLOCKED BY QUEUED VEHICLES AT | | | QUADRILLE BOULEVARD/4TH STREET. | | | 5. IDENTIFY AN AREA INSIDE THE GARAGE WHICH COULD BE | | | CONVERTED TO AN ADDITIONAL VALET DROP-OFF/PICK-UP AREA | | | SHOULD THE NEED ARISES. | | | 6. SHEET A0.06 - CITY CODE SECTION 94-111 PERMITS UP TO | | | FOUR STANDARD PARKING SPACES TO BE COUNTED TOWARDS THE | | | PARKING REQUIREMENT WHEN UP TO EIGHT MOTORCYCLE PARKING | | | SPACES ARE PROVIDED. THEREFORE, THE TOTAL PARKING COUNT | | | TOWARDS THE REQUIRED PARKING WOULD BE 700. | | | 7. SHEET A1.05 - PROVIDE THE EQUIVALENCE OF ONE PARKING | | | SPACE AT THE TERMINUS OF THE DEAD-END AISLE IN WEST | | | SIDE OF THE GARAGE AS A DEDICATED PULL-IN AREA FOR | | | TURNING AROUND PER CITY CODE SECTION 94-111. | | | 8. ON CIVIL PLAN SHEETS 4, 5 AND 6, DARKEN THE LINEWORK | | | FOR THE PROPOSED CURB. ALSO, THE VALET PICK-UP/DROP-OFF | | | LANES ON 4TH STREET DOES NOT SHOW PROPOSED PAVEMENT. | | | PLEASE REVISE. | | | 9. SHOW SIGNING AND PAVEMENT MARKINGS FOR THE INTERNAL | | | ROADWAYS AND ALONG 4TH STREET INCLUDING PARKING SPACES. | | | 10. SHEET 9 SECTION H ? THE RIGHT OF WAY LINE ON THE | | | SOUTH SIDE OF 4TH STREET DOES NOT APPEAR TO BE AT THE | | | RIGHT LOCATION. THERE SHOULD BE 9 FEET BETWEEN THE | | | PARKING LANE AND THE PROPERTY LINE ACCORDING TO THE | | | CROSS-SECTION. | | | 11. PROVIDE SIDEWALK EASEMENT FOR THE PORTION OF | | | SIDEWALK OUTSIDE RIGHT-OF-WAY. | | | 12. PROVIDE 12-FOOT SIDEWALK BETWEEN THE DRIVEWAY AND | | | NORTH OF THE PROPERTY ON QUADRILLE BOULEVARD. | | | 13. PROVIDE ADA-COMPLIANCE CONCRETE LANDING PAD FOR THE | | | RELOCATED BUS STOP WITH SHELTER ON QUADRILLE BOULEVARD. | | | 14. IN THE AUTOTURN EXHIBIT, THE PASSENGER CAR RUNS | | | OVER THE STRIPPED MEDIAN ISLAND AREA JUST OUTSIDE THE | | | GARAGE ENTRANCE FROM QUADRILLE BOULEVARD. PLEASE MODIFY | | | THE STRIPING TO DESIGN FOR PASSENGER CARS. PLEASE ALSO | | | SHOW TWO CONCURRENT PASSENGER CARS MAKING THAT TURN IN | | | THE OPPOSING DIRECTIONS, AND SHOW THE DIMENSIONS OF THE | | | VEHICLES USED IN THE AUTOTURN PATHS. | | | 15. PLEASE REPLACE OR RESET THE PAVERS AT THE DIXIE | | | HIGHWAY/4TH STREET INTERSECTION AS THE PAVERS WILL BE | | | IMPACTED DURING MILLING AND RESURFACING. | | | 16. PROVIDE TDM MEASURES INCLUDING BUT NOT LIMITED TO | | | THE TDM MEASURES LISTED BELOW. DETAILS OF THE TDM | | | MEASURES WILL BE DETERMINED BY THE CITY. MONITORING OF | | | THESE TDM MEASURES WILL ALSO BE REQUIRED. | | | O UNBUNDLED PARKING/PARKING CASH-OUT PROGRAM | | | O TRANSIT PASS SUBSIDY | | | O CONTRIBUTE FUNDING TO TROLLEY OPERATIONS | | | O LIVE NEAR YOUR WORK PROGRAM | | | 17. A TROLLEY STOP ALONG DIXIE HIGHWAY WILL BE REQUIRED | | | AS PART OF THE TDM MEASURES. THE EXACT LOCATION WILL BE | | | DETERMINED BY THE CITY. | | | | | | THE FOLLOWING ITEMS RELATED TO COMMENTS PROVIDED | | | PREVIOUSLY WILL BE INCLUDED IN THE CONDITIONS OF | | | APPROVAL: | | | 1. PROVIDE LANDSCAPED RAISED MEDIAN BETWEEN 4TH STREET | | | AND DIXIE HIGHWAY ON QUADRILLE BOULEVARD. THE MEDIAN | | | DESIGN SHOULD PREVENT WESTBOUND VEHICLES FROM MAKING | | | LEFT-TURNS FROM THE DRIVEWAY. COORDINATE WITH FDOT ON | | | THE TURN LANE REQUIREMENTS AT QUADRILLE BOULEVARD/4TH | | | STREET, THE SITE DRIVEWAY, AND EASTBOUND LEFT-TURN AT | | | QUADRILLE BOULEVARD/DIXIE HIGHWAY. | | | 2. PURSUE WITH FDOT ON ELIMINATING THE EXCLUSIVE | | | RIGHT-TURN LANE REQUIREMENT ON QUADRILLE BOULEVARD. THE | | | CITY WILL PROVIDE A LETTER OF SUPPORT TO THE APPLICANT. | | | 3. CONDUCT TRAFFIC SIGNAL WARRANT ANALYSES AT QUADRILLE | | | BOULEVARD/4TH STREET EVERY YEAR FOR 2 YEARS WHEN THE | | | FOLLOWING CONDITIONS ARE MET: | | | O CO IS ISSUED FOR AT LEAST 50% OF THE PROPOSED | | | RESIDENTIAL UNITS, HOTEL OR GENERAL OFFICE USES, AND | | | THE WESTBOUND APPROACH AT QUADRILLE BOULEVARD/4TH | | | STREET IS OPERATING AT LOS F DURING WEEKDAY AM OR PM | | | PEAK HOUR WHEN ANALYZED USING THE LATEST HIGHWAY | | | CAPACITY MANUAL METHODOLOGY. | | | O CO IS ISSUED FOR AT LEAST 85% OF THE PROPOSED | | | RESIDENTIAL UNITS, HOTEL OR GENERAL OFFICE USES, AND | | | THE WESTBOUND APPROACH AT QUADRILLE BOULEVARD/4TH | | | STREET IS OPERATING AT LOS F DURING WEEKDAY AM OR PM | | | PEAK HOUR WHEN ANALYZED USING THE LATEST HIGHWAY | | | CAPACITY MANUAL METHODOLOGY. | | | O THE LAST CO IS ISSUED FOR THE PROPOSED DEVELOPMENT. | | | 4. THE TRAFFIC SIGNAL ANALYSES SHOULD INCLUDE, AT A | | | MINIMUM, WARRANT 1 EIGHT-HOUR VEHICULAR VOLUME, WARRANT | | | 2 FOUR-HOUR VEHICULAR VOLUME, WARRANT 4 PEDESTRIAN | | | VOLUME, AND WARRANT 7 CRASH EXPERIENCE DOCUMENTED IN | | | THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). | | | THE NECESSARY TRAFFIC AND SAFETY DATA SHOULD BE | | | COLLECTED FOR THE ANALYSES. | | | 5. SHOULD THE REQUEST FOR TRAFFIC SIGNAL BE DENIED, THE | | | DEVELOPMENT SHOULD IMPLEMENT ALTERNATIVE MEASURES TO | | | MITIGATE TRAFFIC CONGESTION AT QUADRILLE BOULEVARD/4TH | | | STREET, INCLUDING BUT NOT LIMITED TO ADDITIONAL TDM | | | MEASURES, WAYFINDING SIGNS TO DIVERT TRIPS TO THE | | | QUADRILLE BOULEVARD/3RD STREET INTERSECTIONS, ETC. IN | | | ADDITION, THE DEVELOPMENT SHOULD, ON CITY?S REQUEST, | | | CONDUCT AN ENGINEERING STUDY FOR A POTENTIAL ENHANCED | | | PEDESTRIAN CROSSWALK CROSSING QUADRILLE BOULEVARD AT | | | 4TH STREET, AND PURSUE SUCH A CROSSWALK APPROVAL WITH | | | FDOT, AND IF APPROVED, CONSTRUCT SUCH ENHANCED | | | CROSSWALK AT THE DEVELOPER?S OWN EXPENSES. | | | 6. PROVIDE SURETY FOR THE CONSTRUCTION OF A TRAFFIC | | | SIGNAL AT QUADRILLE BOULEVARD/4TH STREET UNTIL THE | | | OBLIGATIONS RELATED TO TRAFFIC SIGNAL WARRANT ANALYSES | | | OR SIGNAL CONSTRUCTION (#3, #4 AND #5 ABOVE) ARE FULLY | | | MET. | | | | | | SHING TSOI | | | CITY IN-HOUSE TRAFFIC CONSULTANT | | | 561-494-1141 | | | [email protected] | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
2 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
11-14-2018 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2018-11-14 18:03:51 | TRAFFIC STUDY COMMENTS: | | | 1. PROVIDE COUNTY TPS LETTER. | | | 2. THE TRAFFIC COUNTS AT QUADRILLE BOULEVARD/DIXIE | | | HIGHWAY WERE FROM YEAR 2012, WHICH IS MORE THAN 6 YEARS | | | AGO. PLEASE COLLECT NEW COUNTS. | | | 3. PLEASE GROW HISTORICAL TURNING MOVEMENT COUNTS TO | | | YEAR 2018 BASED ON HISTORICAL GROWTH RATES. | | | 4. CLARIFY IF THESE APPROVED PROJECTS ARE INCLUDED IN | | | THE COMMITTED TRIP CALCULATION: 360 ROSEMARY TOWER, | | | BANYAN PLACE, AND FLAGLER BANYAN SQUARE (OLD CITY HALL | | | SITE). IF NOT, PLEASE INCLUDE THEM. | | | 5. THE LAND USE INTENSITIES ARE NOT CONSISTENT WITH THE | | | PROPOSED SITE PLAN. PLEASE VERIFY AND REVISE. | | | 6. USE ITE METHODOLOGY FOR INTERNAL TRIP CALCULATION. | | | SOME OF THE INTERNAL TRIP REDUCTION ARE HIGHER THAN THE | | | PERCENTAGE INDICATED. PLEASE VERIFY AND REVISE. | | | 7. PROVIDE SOURCE OF THE 20% MULTIMODAL REDUCTION. THE | | | NON-VEHICLE MODE SHARE FOR PALM BEACH COUNTY IS | | | CURRENTLY AT APPROXIMATELY 10%. MULTIMODAL REDUCTION, | | | IF PROPOSED, SHOULD BE APPLIED AFTER INTERNAL TRIPS ARE | | | ACCOUNTED FOR. | | | 8. PROPOSE TDM MEASURES TO SUPPORT MULTIMODAL | | | REDUCTION. | | | 9. THE TRIP ASSIGNMENT IN FIGURE 4 ASSUMES SOME OF THE | | | TRIPS ARE TAKING LONGER ROUTES TO ACCESS THE GARAGE, | | | WHILE THERE ARE MORE DIRECT ROUTES ACCESSING THE GARAGE | | | VIA DIXIE HIGHWAY AND 4TH STREET. PLEASE REVIEW AND | | | REVISE. | | | 10. PLEASE SHOW THE PROPOSED VALET CIRCULATION ROUTE. | | | IT APPEARS THAT THE TRIP ASSIGNMENT IN FIGURE 4 ASSUMES | | | VALET VEHICLES WOULD ACCESS THE GARAGE VIA QUADRILLE | | | BOULEVARD. PLEASE HAVE THE VALET VEHICLES USE THE | | | DRIVEWAY ON 4TH STREET INSTEAD. | | | 11. IN FIGURE 2 PROJECT DISTRIBUTION, A TRIP | | | DISTRIBUTION OF 5% IS ASSUMED ON DIXIE HIGHWAY BETWEEN | | | 4TH STREET AND BANYAN BOULEVARD, BUT 10% IS ASSUMED | | | SOUTH OF BANYAN BOULEVARD, WHICH SEEMS UNREASONABLE. | | | PLEASE VERIFY AND REVISE. | | | 12. PLEASE REPORT HCM 2010 RESULTS BUT NOT HCM 2000 | | | RESULTS. | | | 13. DIXIE HIGHWAY/QUADRILLE BOULEVARD SHOULD BE | | | ANALYZED WITH ACTUATED-COORDINATED CONTROL TYPE BUT NOT | | | ACTUATED-UNCOORDINATED CONTROL TYPE. PLEASE REVISE. | | | 14. THE TWO-WAY STOP CONTROL ANALYSIS AT QUADRILLE | | | BOULEVARD/4TH STREET ASSUMES STORAGE SPACE OF 2 | | | VEHICLES AT THE MEDIAN ON QUADRILLE BOULEVARD, BUT IT | | | APPEARS THAT STORAGE SPACE FOR AT MOST 1 VEHICLE IS | | | PROVIDED. PLEASE REVISE. | | | 15. THE WESTBOUND MOVEMENT AT QUADRILLE BOULEVARD/4TH | | | STREET IS EXPECTED TO OPERATE AT LOS F DURING PM PEAK | | | HOUR UNDER YEAR 2022 TOTAL CONDITIONS, AND THE QUEUE IS | | | EXPECTED TO BLOCK VEHICLE ACCESS TO THE HOTEL/OFFICE | | | DROP OFF. CONSIDER PROVIDING WAYFINDING SIGNS TO | | | REROUTE LEFT-TURNING VEHICLES TO THE QUADRILLE | | | BOULEVARD/3RD STREET INTERSECTION VIA DIXIE HIGHWAY. | | | VERIFY SUFFICIENT CAPACITIES ARE AVAILABLE AT ALL | | | IMPACTED INTERSECTIONS. | | | 16. INSTALL SPEED TABLES ALONG 3RD STREET WEST OF | | | QUADRILLE BOULEVARD TO PREVENT VEHICLES FROM CUTTING | | | THROUGH 3RD STREET TO GET TO BANYAN BOULEVARD WEST. | | | COORDINATE WITH ENGINEERING DEPARTMENT ON THE LOCATIONS | | | OF THE SPEED TABLES. | | | 17. MONITOR TRAFFIC VOLUMES AND OPERATIONS AS WELL AS | | | SAFETY DATA AT QUADRILLE BOULEVARD/4TH STREET AND | | | QUADRILLE BOULEVARD DRIVEWAY, AND CONDUCT SIGNAL | | | WARRANT ANALYSIS AT THE QUADRILLE BOULEVARD DRIVEWAY | | | EVERY YEAR FOR 24 MONTHS AFTER THE LAST CO IS ISSUED. | | | THE SIGNAL WARRANT ANALYSIS WILL ASSUME OUTBOUND | | | VEHICLES AT QUADRILLE BOULEVARD/4TH STREET WOULD USE | | | THE QUADRILLE BOULEVARD DRIVEWAY. IF A SIGNAL IS | | | WARRANTED, CONSTRUCT A SIGNAL AT THE QUADRILLE | | | BOULEVARD DRIVEWAY. | | | 18. PROVIDE SURETY FOR THE CONSTRUCTION OF THE SIGNAL | | | AT THE QUADRILLE BOULEVARD DRIVEWAY, UNTIL 24 MONTHS | | | AFTER THE LAST CO IS ISSUED. | | | 19. SOUTHBOUND LEFT-TURN AT QUADRILLE BOULEVARD/4TH | | | STREET HAS ONLY 10 AND 3 VEHICLES PER HOUR DURING AM | | | AND PM PEAK HOUR PER THE TRAFFIC STUDY. CLARIFY IF AN | | | EXCLUSIVE LEFT-TURN LANE IS WARRANTED. CONSIDER | | | EXTENDING THE RAISED MEDIAN TO 4TH STREET AND PROVIDE A | | | PEDESTRIAN REFUGE ISLAND TO FACILITATE PEDESTRIAN | | | CROSSING ACROSS QUADRILLE BOULEVARD TO ACCESS THE BUS | | | STOP. PROVIDE PEDESTRIAN CURB RAMP ON THE WEST SIDE OF | | | QUADRILLE BOULEVARD/4TH STREET. | | | 20. PROVIDE QUEUING ANALYSIS FOR VALET VEHICLES AT THE | | | DROP-OFF, AND VERIFY THAT THE VEHICLE QUEUES WOULD NOT | | | SPILL BACK ONTO 4TH STREET. | | | SITE PLAN COMMENTS: | | | 21. PROVIDE FDOT DRIVEWAY LETTER OR PERMIT. | | | 22. INCLUDE DESIGN FOR THE PROPOSED RAISED MEDIAN ALONG | | | QUADRILLE BOULEVARD IN THE CIVIL PLAN. THE MEDIAN | | | DESIGN SHOULD PREVENT WESTBOUND VEHICLES FROM MAKING | | | LEFT-TURNS FROM THE DRIVEWAY. THE MEDIAN DESIGN AS | | | CURRENTLY SHOWN ON THE SITE PLAN DOES NOT RESTRICT | | | WESTBOUND LEFT-TURN MOVEMENT. PROVIDE 10-FOOT | | | LANDSCAPED RAISED MEDIAN. | | | 23. SHEET A0.06 - UP TO EIGHT MOTORCYCLE PARKING SPACES | | | MAY BE PERMITTED IN LIEU OF FOUR STANDARD PARKING | | | SPACES PER CITY CODE SECTION 94-111. PLEASE REVISE THE | | | PARKING COUNT. ALSO, WHAT ARE THE ?LIFTS? PARKING | | | SPACE? THE SITE PLAN DOES NOT INDICATE ?LIFTS? PARKING | | | SPACES. | | | 24. SOME OF THE TANDEM PARKING SPACES ARE SHOWN TO HAVE | | | A PARKING CURB STOP IN THE OUTSIDE PARKING SPACE. | | | PLEASE REVISE. | | | 25. SHEET A1.04 - A BUILDING COLUMN ENCROACHES ONE OF | | | THE TANDEM PARKING SPACES ON THE EAST SIDE OF THE | | | GARAGE. PLEASE REVISE. | | | 26. PROVIDE THE EQUIVALENT OF ONE PARKING SPACE AT THE | | | TERMINUS OF A DEAD-END AISLE AS A DEDICATED PULL-IN | | | AREA FOR TURNING AROUND PER CITY CODE SECTION 94-111. | | | 27. SHEETS A1.04 AND A1.05 - CLARIFY HOW VEHICLES WILL | | | SAFELY PULL OUT FROM THE TWO DEAD-END PARKING SPACES ON | | | THE WEST SIDE OF THE GARAGE. PROVIDE AUTOTURN PATH FOR | | | VEHICLE PULL OUT FOR PASSENGER CARS. | | | 28. THE TWO DRIVEWAYS ON DIXIE HIGHWAY DOES NOT MEET | | | THE MINIMUM DRIVEWAY SEPARATION OF 125 FEET PER CITY | | | CODE 94-312. PLEASE REVISE. | | | 29. THE DOOR OF THE FENCED BICYCLE PARKING AREA NEAR | | | QUADRILLE BOULEVARD OPENS ONTO THE INTERNAL ROADWAY | | | WITHOUT ANY BUFFER AREA. CONSIDER PROVIDING A RAISED | | | AREA AT THE CORNER OF THE ROADWAY CURVE, AND PROVIDE A | | | RECESSED ENTRANCE TO PROVIDE BIGGER PROTECTED AREA | | | OUTSIDE THE BICYCLE PARKING AREA FOR CYCLISTS TO GO IN | | | AND OUT WITH THEIR BICYCLES. | | | 30. INDICATE ON THE PLAN THE LOCATION OF SHOWER | | | FACILITY FOR EMPLOYEES. DOES THE CHANGING FACILITY | | | SHOWN ON SHEET A1.02 INCLUDES SHOWER? | | | 31. SHEET A0.05 - THE AERIAL DOES NOT ALIGN WITH THE | | | SITE RENDERING. PLEASE REVISE. | | | 32. COORDINATE WITH PALM TRAN ON THE EXISTING BUS STOP | | | ON QUADRILLE BOULEVARD, WHICH MAY BE IN CONFLICT WITH | | | THE PROPOSED RIGHT-TURN LANE AND SIDEWALK. | | | 33. A DROP OFF LANE IS SHOWN NEAR THE DRIVEWAY ON | | | QUADRILLE BOULEVARD IN THE CIVIL PLAN (E.G. SHEET 4) | | | BUT NOT ON THE SITE PLAN (E.G. A1.01). PLEASE REVISE TO | | | REMOVE THE INCONSISTENCY. | | | 34. PROVIDE AUTOTURN PATHS FOR DELIVERY AND GARBAGE | | | TRUCKS. | | | 35. PROVIDE AUTOTURN PATHS FOR THE INTERNAL CIRCULATION | | | ROADWAYS AND THE GARAGE ENTRANCE/EXIT NEAR THE | | | QUADRILLE BOULEVARD DRIVEWAY, AS WELL AS THE DROP OFF | | | AREA ON 4TH STREET. SOME OF THE TURNING RADII APPEAR TO | | | BE VERY SMALL. MODIFY THE EXIT OF THE PORTE COCHERE TO | | | FACILITY VALET VEHICLES TO USE THE DRIVEWAY ON 4TH | | | STREET. | | | 36. PROVIDE STOP CONTROL ON ALL THREE RAMP APPROACHES | | | AT THE SECOND STORY RAMPED T-INTERSECTION. | | | 37. CLARIFY IF TWO LANES ARE NEEDED FOR THE | | | SOUTHWEST-BOUND INTERNAL ROADWAY NEAR THE DIXIE HIGHWAY | | | DRIVEWAY. THE SUBMITTED TRAFFIC CIRCULATION STUDY SHOWS | | | ONLY 9 AND 6 VEHICLES PER HOUR WOULD USE THIS ROADWAY | | | DURING AM AND PM PEAK HOUR RESPECTIVELY. | | | 38. PROTECTED BIKE LANE WITH LANE ELIMINATION ON | | | QUADRILLE BOULEVARD IS IDENTIFIED IN THE CITY?S | | | DOWNTOWN MOBILITY PLAN. INSTALL 6-FOOT ELEVATED BIKE | | | LANE WITH ASPHALT PAVEMENT, AS WELL AS LANDSCAPED | | | BUFFER WITH TREES BETWEEN THE BIKE LANE AND SIDEWALK | | | ALONG THE SITE FRONTAGE. | | | 39. QUADRILLE BOULEVARD HAS EXCESS CAPACITY, AND THE | | | PROPOSED RIGHT-TURN LANE DOES NOT FIT IN THE CONTEXT OF | | | QUADRILLE BOULEVARD IN A DOWNTOWN ENVIRONMENT. THE CITY | | | DOES NOT SUPPORT THE EXCLUSIVE RIGHT-TURN LANE. AS A | | | CONDITION OF APPROVAL, PURSUE WITH FDOT ON ELIMINATING | | | THE EXCLUSIVE RIGHT-TURN LANE REQUIREMENT. | | | 40. SHOW THE CURB CUTS AND DRIVEWAYS ON THE OPPOSITE | | | SIDE OF 4TH STREET. PROVIDE PAVEMENT MARKING FOR | | | PARKING SPACES ON THE SOUTH SIDE OF 4TH STREET AS THESE | | | SPACES WILL BE METERED. | | | 41. SHEET 5 - SPECIAL EMPHASIS PAVEMENT MARKINGS ARE | | | SHOWN ACROSS THE CROSSWALK AT DIXIE HIGHWAY/4TH STREET, | | | BUT THE EXISTING CROSSWALK HAS PAVERS. PLEASE REVISE TO | | | MATCH EXISTING INTERSECTION HARDSCAPE. | | | 42. USE STAMPED ASPHALT CROSSWALKS FOR THE CROSSWALKS | | | ALONG QUADRILLE BOULEVARD, MATCHING OTHER STAMPED | | | CROSSWALKS ON QUADRILLE BOULEVARD. | | | 43. SHEET 9 SECTIONS G AND H ? SHOW RIGHT OF WAY LINE | | | ON THE SOUTH SIDE OF 4TH STREET. | | | 44. L0-002 ? QUADRILLE IS A STATE HIGHWAY. THE 20-FOOT | | | SAFE SIGHT TRIANGLES SHOWN DOES NOT MEET FDOT | | | REQUIREMENTS. REFERENCE FDOT DESIGN MANUAL SECTION | | | 212.11. | | | 45. SIDEWALK ON DIXIE HIGHWAY IS SHOWN AS 8 FEET ON | | | SHEET A1.01 AND L1-110, BUT IS SHOWN AS 7 FEET ON THE | | | CROSS SECTION ON SHEET 9 AND L3-100. CLARIFY THE | | | SIDEWALK WIDTH. THE CITY PREFERS 8-FOOT SIDEWALK BE | | | PROVIDED. | | | 46. DISCUSS THE PARKING ARRANGEMENT AMONG HOTEL, | | | RESIDENTIAL AND OFFICE USES. WOULD EACH RESIDENTIAL | | | UNIT HAVE RESERVED PARKING SPACE? WOULD RESIDENTS BE | | | ABLE TO VALET THEIR VEHICLES? | | | 47. SHOW RIGHT OF WAY WIDTH FROM CENTERLINE AND FULL | | | CENTERLINE. | | | 48. PROVIDE TDM MEASURES, INCLUDING PARKING PRICING, | | | PARKING CASH-OUT PROGRAM/UNBUNDLED PARKING, TRANSIT | | | PASS SUBSIDY, CONTRIBUTION TO TROLLEY OPERATIONS, | | | RESERVED LOCATIONS FOR SHARED MOBILITY, LIVE NEAR YOUR | | | WORK PROGRAM, RIDESHARING AND CAR SHARING SERVICES AND | | | FACILITIES. | | | | | | SHING TSOI | | | CITY IN-HOUSE TRAFFIC CONSULTANT | | | 561-494-1141 | | | [email protected] |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2017-04-25 10:33:12 | | | | CONTACT ERIK FERGUSON [email protected] | | | | | | | | | 1. THERE ARE MULTIPLE PROPOSED TRAFFIC CIRCULATION | | | PATTERNS SHOWN IN THE SUBMITTAL. FOR EXAMPLE SHEET | | | A0.07 ? DAC SUBMITTAL, PLAN VIEW FOR LEVEL ONE SHOWS | | | TWO WAY TRAFFIC BETWEEN 4TH STREET AND NORTH DIXIE | | | HIGHWAY. SHEET 5 SIGNING AND MARKING SHOWS N. DIXIE | | | HIGHWAY ENTRANCE AS TWO- ONE WAY LANES. TRAFFIC | | | CIRCULATION AT PARKING GARAGE RAMP INTERSECTION IS | | | INCONSISTENT BETWEEN SHEET A0.07 AND SHEET 5. CLARIFY | | | WHAT IS THE PROPOSED TRAFFIC CIRCULATION. | | | 2. SHEET A0.07, SHEET 5, AND SHEET A0.10 ? INTERNAL | | | TRAFFIC CIRCULATION AT THE THREE WAY INTERSECTION IS | | | INCONSISTENT. WE ARE UNABLE TO REVIEW THE TRAFFIC | | | CIRCULATION. PLEASE CONTACT CITY TRANSPORTATION | | | DIVISION TO SCHEDULE TO DISCUSS INTERNAL TRAFFIC | | | CIRCULATION. | | | 3. SHEET A0.07 ? LEVEL #1. THE WALL AT THE PARKING | | | GARAGE INTERSECTION WILL NOT PROVIDE ADEQUATE SIGHT | | | DISTANCE TO OTHER INTERSECTIONS. | | | 4. CHANGES TO THE INTERNAL TRAFFIC CIRCULATION WILL | | | REQUIRE AN UPDATED TRAFFIC IMPACT STUDY AS THIS WILL | | | CHANGE THE VOLUMES AT INTERSECTIONS AND TRIP | | | DISTRIBUTION. | | | 5. SHEET 5 - SPECIFY SIZE OF SIGNS. | | | 6. SHEET 5 - ADD STREET NAME BLADES TO STOP SIGNS. | | | 7. SHEET 5 - ADD CROSSWALK MARKINGS AT ALL STOP | | | CONTROLLED INTERSECTIONS. | | | 8. SHEET 5 - PROVIDE PROTECTED BIKE LANES ON N. | | | QUADRILLE BOULEVARD | | | 9. SHEET 5 - NORTHERN N QUADRILLE BLVD. DRIVEWAY, A | | | TRAFFIC SEPARATOR IS SHOWN ON SHEET 5, BUT IT IS NOT | | | SHOWN ON THE GRADING PLAN (SHEET 4). WHAT IS THE WIDTH | | | OF THE LANES AND THE TRAFFIC SEPARATOR? | | | 10. SHEET 5 - NORTHERN N QUADRILLE BLVD ? DRIVEWAY, THE | | | EXIT IS SHOWN AS ONLY RIGHT OUT. HOW WILL THIS BE | | | ENFORCED? SUGGEST RESTRICTIVE MEDIAN ON QUADRILLE | | | BOULEVARD. EXIT DOES NOT APPEAR TO ADEQUATE HORIZONTAL | | | SIGHT DISTANCE FOR LEFT TURN MOVEMENT, SO IT IS | | | IMPORTANT TO RESTRICT THE LEFT OUT MOVEMENT. | | | 11. SHEET 5 - NORTHERN N QUADRILLE BLVD DRIVEWAY. THE | | | STOP BAR IS SHOWN ACROSS A HATCHED OUT AREA. THE STOP | | | BAR NEEDS TO STOP AT THE END OF THE LANE. WHAT IS THE | | | HATCHED OUT AREA NEXT TO THE EXIT LANE? HOW WILL | | | TRAFFIC | | | 12. SHEET 4 - WHAT IS THE WIDTH OF THE PROPOSED RIGHT | | | TURN LANES ON QUADRILLE? PROVIDE SECTION FOR PROPOSED | | | RIGHT TURN LANE. | | | 13. SHEET 4 - SECTION D (4TH STREET). ARE 12? WIDE | | | LANES REQUIRED? CAN THEY BE NARROWED? | | | 14. SHEET 4 - 4TH STREET. IT IS UNCLEAR IF THE CURB | | | WILL BE NEW OR EXISTING. SECTION G AND H APPEAR TO | | | INDICATE NEW CURB CURB, BUT NEW CURB IS NOT SHOWN ON | | | SHEET 4. | | | 15. QUADRILLE - 4TH STREET INTERSECTION ? PROVIDE BULB | | | OUT TO REDUCE PEDESTRIAN CROSSING DISTANCE. | | | 16. SHEET 4 - SPECIFY THE RADIUS OF ANY PROPOSED | | | CURBING IN PUBLIC RIGHT OF WAY. DRAW THE PROPOSED CURB | | | RAMP AND ADD THE FDOT CURB RAMP DESIGNATION. | | | 17. SHEET 4 - PROPOSED SIDEWALKS NEED TO BE SHOWN ON | | | CIVIL PLANS. | | | | | | 18. SHEET 9 - SECTION G AND H (4TH STREET) ? REDUCE | | | TRAVEL LANES FROM 11' TO 10'. SHOW RIGHT OF WAY LINE ON | | | SOUTH SIDE OF 4TH STREET. | | | 19. SHEET 9 - SECTION H (4TH STREET) SPECIFY WIDTH OF | | | SOUTH SIDEWALK. | | | 20. SHEET 9 - SECTION H (4TH STREET) UTILIZE GUTTER PAN | | | AS PART OF THE 8' PARALLEL PARKING WIDTH. INCREASE | | | SOUTH SIDEWALK WIDTH. | | | 21. SHEET 4, 9 - THE REVIEW OF THE STREETS IS | | | CONCEPTUAL. DETAILED ROADWAY PLANS INCLUDING A PROFILE | | | FOR 4TH STREET AND PAVEMENT DESIGN WILL NEED TO BE | | | PROVIDED. | | | 22. SIDEWALK ON SOUTH SIDE OF 4TH STREET MAY NOT MEET | | | ADA MINIMUM WIDTH. IS IT POSSIBLE TO MOVE CURB LINE | | | NORTH WITH RECONSTRUCTION OF 4TH STREET? | | | 23. L0-002 - QUADRILLE IS A STATE HIGHWAY. THE 20? SAFE | | | SIGHT TRIANGLES SHOWN DOES NOT MEET FDOT REQUIREMENTS. | | | REFERENCE FDOT DESIGN STANDARDS, INDEX NO. 546. | | | 24. L3-100 - SECTION -02 AND 05- 4TH AND 5TH STREET | | | .THE 5'-3" AND 5'-0" WIDE SIDEWALK DO NOT MEET FDOT | | | GREENBOOK REQUIREMENTS. A MINIMUM 6' WIDTH SIDEWALK | | | MUST BE PROVIDED FOR SIDEWALKS LOCATED BEHIND THE BACK | | | OF CURB. SUGGEST A WIDER SIDEWALK THAN MINIMUM. ALSO, | | | 1'-6" WIDTH SHOWN IS NOT CORRECT FOR F CURB. | | | 25. HOTEL DROP OFF- L3-100 SECTION 2 - CAN THE WIDTH OF | | | THE DROP OF BE REDUCED? CURB FOR DROP OFF SHOULDN'T BE | | | LOCATED IN RIGHT OF WAY. | | | 26. DUE TO THE NUMBER OF INCONSISTENCIES IN THE PLANS, | | | WE CANNOT APPROVE THE PLANS. | | | | | | | | | | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
8 |
Status |
F |
Date |
10-23-2020 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
10-23-2020 |
Time |
16:45 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
10-08-2020 |
Time |
11:46 |
Sent To |
|
|
| Notes |
| 2020-10-23 16:44:58 | 1. SATISFIED- / SHEET A0.102 LIST BUILDING FOOTPRINT | | | REQUIREMENT AS MINIMUM PERCENTAGE, IT IS A MAXIMUM | | | PERCENTAGE. PLEASE CORRECT DATA TO ACCURATELY REFLECT | | | REQUIREMENT. | | | 2. PARTIALLY SATISFIED - PLEASE LIST THE REQUIRED GUEST | | | PARKING FOR THE MICROUNITS.- / SHEET A0.102 STILL LIST | | | 328 RESIDENTIAL UNITS WITHIN THE PROJECT DESCRIPTION | | | AND THE REQUIRED PARKING DATA. PLEASE ADJUST TO THE | | | CURRENT PROPOSAL OF 230 UNITS. TABLE IN THE SAME SHEET | | | LIST 202 REGULAR RESIDENTIAL UNITS AND 23 MICRO UNITS | | | FOR A TOTAL OF 205 NOT THE NEW 230 LISTED. PLEASE | | | CORRECT AND ADJUST ALL RELATED CALCULATIONS. SHEET | | | A0.06 OF SITE PLAN PACKET ALSO HAS DISCREPANCIES. | | | AVERAGE UNIT SIZE IS LISTED BUT NOT LEGIBLE. | | | 3. SATISFIED/ IN SHEET A1.500, THE HOTEL UNITS | | | DESCRIPTION AND AREAS SUITE 1.3C AND 1.3W UNIT AREA IS | | | NOT LISTED. PLEASE UPDATE TABLE AND INCLUDE INFORMATION | | | TO CONFIRM COMPLIANCE WITH MINIMUM 350SF UNITS SIZE. | | | 4. SATISFIED/ PLEASE PROVIDE INFORMATION TO CONFIRM | | | THAT REGULAR RESIDENTIAL UNITS COMPLY WITH THE AVERAGE | | | 800SF UNIT SIZE. | | | 5. SATISFIED/ PLEASE SUBMIT COLORED ELEVATIONS WITH | | | CALL OUT MATERIALS. | | | 6. PARTIALLY SATISFIED- PLEASE CHECK THE FAR TABLE | | | LISTED IN A0.06 AS THE FAR BY USE IN EVENT +RESTAURANT | | | IS LESS THAN HOTEL RESTAURANT AND PUBLIC MEETING.-/ | | | PLEASE SUBMIT THE FAR DETAIL INFORMATION PER FLOOR AS | | | SUBMITTED FOR SITE PLAN APPROVAL. SHEET A0.08 IN SITE | | | PLAN APPROVAL HAS A TYPO IN THE LEVEL NUMBERS. | | | 7. NOT SATISFIED- MORE DETAIL IS NEEDED FOR THE GREEN | | | SCREEN. PLEASE INDICATE PROPOSED PLANT MATERIAL FOR | | | GREEN SCREEN AND INCLUDE A MAINTENANCE PLAN-/.PLEASE | | | EXPLAIN HOW THE PLANTS PROPOSED FOR THE GARAGE | | | SCREENING WILL GROW AND STILL MAINTAIN THE AIR FLOW | | | REQUIRED FOR GARAGE VENTILATION. | | | 8. SATISFIED.-PLEASE CONFIRM THE GLASS UTILIZED FOR | | | THIS PROJECT AT THE GROUND FLOOR IS NOT DARK TINTED OR | | | REFLECTIVE TO THE POINT THAT THE INTERIOR IS NOT | | | VISIBLE FROM OUTSIDE. | | | 9. SATISFIED.-FURTHER DISCUSSION IS NECESSARY FOR THE | | | SELECTION OF THE LANDSCAPE MATERIAL TO BE LOCATED ON | | | THE QUADRILLE BLVD MEDIAN. | | | 10. PARTIALLY SATISFIED-PLEASE INDICATE THE NEW | | | LOCATION OF THE TROLLEY SHELTER -PLEASE CONFIRM PALM | | | TRAM APPROVED THE RELOCATION OF THE EXISTING SHELTER TO | | | THE PROPOSED LOCATION. | | | 11. SATISFIED- DUE TO THE PROPOSED MICROUNITS PROJECT | | | IS REQUIRED TO PROVIDE 1 CAR SHARING STATION PER EVERY | | | 13 MICROUNITS. IF PARKING IS PROVIDED FOR THE | | | MICROUNITS THERE MUST BE AT LEAST ONE CAR SHARING | | | STATION ON SITE. PLEASE IDENTIFY LOCATION OF CAR | | | SHARING STATION INSIDE PARKING GARAGE. | | | 12. SATISFIED- DUE TO THE PROPOSED MICROUNITS, PROJECT | | | IS REQUIRED TO CONTRIBUTE A FEE INTO THE TROLLEY | | | OPERATION FUND. FEE IS EQUAL TO $10 PER UNIT/MONTH. AN | | | AGREEMENT WILL BE REQUIRED WITH THE PROPERTY OWNER | | | BEFORE FINAL CO. | | | 13. SATISFIED- PLEASE IDENTIFY THE LOCATION FOR | | | MICRO-MOBILITY STATION WITHIN THE PROJECT PUBLIC REALM | | | AREA. | | | 14. SATISFIED - MINIMUM ACTIVE USE REQUIREMENT ALONG | | | DIXIE HWAY IS 80% NOT 79%. PLEASE ADJUST TO CONFIRM | | | COMPLIANCE. SITE PLAN INFORMATION SHOWS 80% NOT THE | | | 79%. IN ADDITION, USES BEHIND THE CURB CUT (OUTLINED IN | | | RED) CANNOT BE COUNTED AS ACTIVE USES FOR THE PURPOSE | | | OF CALCULATING MINIMUM ACTIVE USE REQUIRED AS THEY ARE | | | BEHIND THE MINIMUM SETBACK AND NOT ADJACENT TO A PUBLIC | | | OPEN SPACE. YOU MAY NEED TO EXTEND THE RETAIL A LITTLE | | | BIT TO THE NORTH TO REDUCE THE GAP. | | | 15. SATISFIED- THE VARIANCE APPROVED BY THE DAC TO | | | REDUCE ACTIVE USES ABOVE THE FIRST FLOOR ALONG | | | QUADRILLE BLVD ALLOWED A REDUCTION FROM 60% TO 47%. | | | PROPOSED PROJECT LISTS ACTIVE USES ONLY ALONG 31.9%. | | | PLEASE INCREASE AMOUNT OF ACTIVE USES TO COMPLY WITH | | | VARIANCE APPROVED. SITE PLAN INFORMATION SHOWS 47% | | | ACTIVE USES BUT BUILDING PERMIT PACKET SHOWS 31.9%. | | | PLEASE IDENTIFY WHERE THE DISCREPANCY EXISTS. | | | 16. SATISFIED- PLEASE PROVIDE A PEDESTRIAN CROSSING | | | ACROSS DIXIE HWAY FROM THE SE CORNER OF THE PROJECT. | | | 17. SATISFIED- PLEASE RELOCATE AT LEAST 3 BIKE RACKS | | | CLOSER TO THE OFFICE TOWER OPEN SPACE, AND RELOCATE AT | | | LEAST 2 BIKE RACKS TO THE AREA CLOSER TO THE PROPOSED | | | RETAIL. | | | 18. SATISFIED- GRADING PLAN SHEET 4 HAS LABELS BLACKED | | | OUT. | | | 19. SATISFIED- A SEPARATE LANDSCAPE PERMIT WILL BE | | | REQUIRED FOR THIS PERMIT. | | | 20. NOT SATISFIED-/PLEASE PROVIDE INFORMATION TO | | | CONFIRM COMPLIANCE WITH PLANAR BREAK REQUIREMENT ALONG | | | ALL FRONTAGES. | | | FOR ADDITIONAL INFORMAITON PLEASE CONTACT ANA MARIA | | | APONTE AT 561-822-1439. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
7 |
Status |
F |
Date |
03-20-2020 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
03-20-2020 |
Time |
09:05 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
03-20-2020 |
Time |
09:04 |
Sent To |
|
|
| Notes |
| 2020-03-20 09:05:58 | 1. SHEET A0.102 LIST BUILDING FOOTPRINT REQUIREMENT AS | | | MINIMUM PERCENTAGE, IT IS A MAXIMUM PERCENTAGE. PLEASE | | | CORRECT DATA TO ACCURATELY REFLECT REQUIREMENT. | | | 2. SHEET A0.102 STILL LIST 328 RESIDENTIAL UNITS WITHIN | | | THE PROJECT DESCRIPTION AND THE REQUIRED PARKING DATA. | | | PLEASE ADJUST TO THE CURRENT PROPOSAL OF 230 UNITS. | | | TABLE IN THE SAME SHEET LIST 202 REGULAR RESIDENTIAL | | | UNITS AND 23 MICRO UNITS FOR A TOTAL OF 205 NOT THE NEW | | | 230 LISTED. PLEASE CORRECT AND ADJUST ALL RELATED | | | CALCULATIONS. SHEET A0.06 OF SITE PLAN PACKET ALSO HAS | | | DISCREPANCIES. AVERAGE UNIT SIZE IS LISTED BUT NOT | | | LEGIBLE. | | | 3. IN SHEET A1.500, THE HOTEL UNITS DESCRIPTION AND | | | AREAS SUITE 1.3C AND 1.3W UNIT AREA IS NOT LISTED. | | | PLEASE UPDATE TABLE AND INCLUDE INFORMATION TO CONFIRM | | | COMPLIANCE WITH MINIMUM 350SF UNITS SIZE. | | | 4. PLEASE PROVIDE INFORMATION TO CONFIRM THAT REGULAR | | | RESIDENTIAL UNITS COMPLY WITH THE AVERAGE 800SF UNIT | | | SIZE. | | | 5. PLEASE SUBMIT COLORED ELEVATIONS WITH CALL OUT | | | MATERIALS. | | | 6. PLEASE SUBMIT THE FAR DETAIL INFORMATION PER FLOOR | | | AS SUBMITTED FOR SITE PLAN APPROVAL. SHEET A0.08 IN | | | SITE PLAN APPROVAL HAS A TYPO IN THE LEVEL NUMBERS. | | | 7. PLEASE EXPLAIN HOW THE PLANTS PROPOSED FOR THE | | | GARAGE SCREENING WILL GROW AND STILL MAINTAIN THE AIR | | | FLOW REQUIRED FOR GARAGE VENTILATION. | | | 8. PLEASE CONFIRM THE GLASS UTILIZED FOR THIS PROJECT | | | AT THE GROUND FLOOR IS NOT DARK TINTED OR REFLECTIVE TO | | | THE POINT THAT THE INTERIOR IS NOT VISIBLE FROM | | | OUTSIDE. | | | 9. FURTHER DISCUSSION IS NECESSARY FOR THE SELECTION OF | | | THE LANDSCAPE MATERIAL TO BE LOCATED ON THE QUADRILLE | | | BLVD MEDIAN. | | | 10. PLEASE CONFIRM PALM TRAM APPROVED THE RELOCATION OF | | | THE EXISTING SHELTER TO THE PROPOSED LOCATION. | | | 11. DUE TO THE PROPOSED MICROUNITS PROJECT IS REQUIRED | | | TO PROVIDE 1 CAR SHARING STATION PER EVERY 13 | | | MICROUNITS. IF PARKING IS PROVIDED FOR THE MICROUNITS | | | THERE MUST BE AT LEAST ONE CAR SHARING STATION ON SITE. | | | PLEASE IDENTIFY LOCATION OF CAR SHARING STATION INSIDE | | | PARKING GARAGE. | | | 12. DUE TO THE PROPOSED MICROUNITS, PROJECT IS REQUIRED | | | TO CONTRIBUTE A FEE INTO THE TROLLEY OPERATION FUND. | | | FEE IS EQUAL TO $10 PER UNIT/MONTH. AN AGREEMENT WILL | | | BE REQUIRED WITH THE PROPERTY OWNER BEFORE FINAL CO. | | | 13. PLEASE IDENTIFY THE LOCATION FOR MICRO-MOBILITY | | | STATION WITHIN THE PROJECT PUBLIC REALM AREA. | | | 14. MINIMUM ACTIVE USE REQUIREMENT ALONG DIXIE HWAY IS | | | 80% NOT 79%. PLEASE ADJUST TO CONFIRM COMPLIANCE. SITE | | | PLAN INFORMATION SHOWS 80% NOT THE 79%. IN ADDITION, | | | USES BEHIND THE CURB CUT (OUTLINED IN RED) CANNOT BE | | | COUNTED AS ACTIVE USES FOR THE PURPOSE OF CALCULATING | | | MINIMUM ACTIVE USE REQUIRED AS THEY ARE BEHIND THE | | | MINIMUM SETBACK AND NOT ADJACENT TO A PUBLIC OPEN | | | SPACE. YOU MAY NEED TO EXTEND THE RETAIL A LITTLE BIT | | | TO THE NORTH TO REDUCE THE GAP. | | | 15. THE VARIANCE APPROVED BY THE DAC TO REDUCE ACTIVE | | | USES ABOVE THE FIRST FLOOR ALONG QUADRILLE BLVD ALLOWED | | | A REDUCTION FROM 60% TO 47%. PROPOSED PROJECT LISTS | | | ACTIVE USES ONLY ALONG 31.9%. PLEASE INCREASE AMOUNT OF | | | ACTIVE USES TO COMPLY WITH VARIANCE APPROVED. SITE PLAN | | | INFORMATION SHOWS 47% ACTIVE USES BUT BUILDING PERMIT | | | PACKET SHOWS 31.9%. PLEASE IDENTIFY WHERE THE | | | DISCREPANCY EXISTS. | | | 16. PLEASE PROVIDE A PEDESTRIAN CROSSING ACROSS DIXIE | | | HWAY FROM THE SE CORNER OF THE PROJECT. | | | 17. PLEASE RELOCATE AT LEAST 3 BIKE RACKS CLOSER TO THE | | | OFFICE TOWER OPEN SPACE, AND RELOCATE AT LEAST 2 BIKE | | | RACKS TO THE AREA CLOSER TO THE PROPOSED RETAIL. | | | 18. GRADING PLAN SHEET 4 HAS LABELS BLACKED OUT. | | | 19. A SEPARATE LANDSCAPE PERMIT WILL BE REQUIRED FOR | | | THIS PERMIT. | | | 20. PLEASE PROVIDE INFORMATION TO CONFIRM COMPLIANCE | | | WITH PLANAR BREAK REQUIREMENT ALONG ALL FRONTAGES. | | | FOR ADDITIONAL INFORMAITON PLEASE CONTACT ANA MARIA | | | APONTE AT 561-822-1439. | | | | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
6 |
Status |
F |
Date |
09-10-2019 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
09-10-2019 |
Time |
08:04 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
07-26-2019 |
Time |
08:04 |
Sent To |
|
|
| Notes |
| 2019-09-10 08:31:03 | ADDITIONAL COMMENTS BASED ON CHANGES FROM LAST | | | SUBMITTAL: | | | 1. THE MINIMUM HOTEL ROOM SIZE FOR A FULL SERVICE HOTEL | | | IS 350SF. THERE ARE 5 ROOMS THAT DO NOT MEET THE | | | DEFINITION REQUIRED FOR THE INCENTIVE PROGRAM. PLEASE | | | ADJUST ROOM SIZE TO MEET MINIMUM REQUIRED. | | | 2. SIDEWALK BETWEEN THE OFFICE PLAZA AND THE HOTEL | | | DROP-OFF AREA (NEXT TO PLANTER) SHALL BE WIDENED TO A | | | MINIMUM OF 6 FEET. | | | 3. MAXIMUM BUILDING FOOTPRINT INFORMATION SHALL SAY | | | ?MAXIMUM? ALLOWED, NOT MINIMUM. | | | 4. WITHIN THE PARKING CALCULATION (SHEET A0.06) PLEASE | | | INCLUDE A SEPARATE LINE FOR MICROUNITS AND STATE THE | | | MAXIMUM NUMBER OF PARKING SPACES ALLOWED (0.5 PER | | | UNIT), AND THE BIKE SPACES REQUIRED SEPARATE FOR | | | MICROUNITS (0.5 PARKING SPACES PER UNIT= 14.5) AND FOR | | | REGULAR UNITS (1/15=19.9).TOTAL NUMBER OF BIKE SPACE | | | FOR RESIDENTIAL = 34 SPACES. YOU WILL NEED FEW MORE. | | | 5. PLEASE INCLUDE THE CAR SHARING STATION SPACE | | | REQUIRED IN THE CALCULATIONS. | | | 6. LAST SET OF DRAWINGS DID NOT INCLUDE THE DETAILS FOR | | | THE GARAGE SCREEN. PLEASE INSERT BACK IN THE DRAWINGS. | | | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA | | | APONTE AT 561-822-1439. | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
5 |
Status |
F |
Date |
04-19-2019 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
04-19-2019 |
Time |
09:07 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
04-01-2019 |
Time |
09:07 |
Sent To |
|
|
| Notes |
| 2019-04-19 14:41:19 | OUTSTANDING COMMENTS FROM PREVIOUS REVIEWS: | | | 1. FIRE DEPARTMENT CONNECTION ON 4TH STREET (BY OFFICE | | | PLAZA) SEEMS TO BE LOCTED ON THE PEDESTRIAN PATH. | | | PLEASE CLARIFY THE EXACT LOCATION AND IT THE FDC WILL | | | BE A WALL MOUNTED CONNECTION OR A STAND PIPE. | | | 2. PLEASE INDICATE THE LOCATION OF THE CAR SHARING | | | SPACES IN THE FLOOR PLAN AND ADD THEM TO THE PARKING | | | TABLE. | | | 3. LIGHT FIXTURES AND POLES WITHIN THE ROW SHALL MEET | | | CITY STANDARDS.SUBMITTED LIGHTING DRAWINGS INDICATE A | | | DIFFERENT FIXTURE. | | | 4. EXFILTRATION TRENCH RELOCATED IN DRAINAGE SHEET NO. | | | 3 BUT IT IS STILL SHOWN IN WATER ADN SEWER SHEET NO. 6. | | | PLEASE ADJUST. | | | 5. THERE ARE SOME UTILITY LINES UNDER THE PLANTING AREA | | | ON 4TH STREET AND THE OFFICE ENTRANCE. PLEASE RELOCATE | | | THE UTILITIES SO THEY DO NOT CONFLICT WITH PROPOSED | | | LANDSCAPE. | | | 6. THE TYPE OF PAVERS PROPOSED ON THE SIDEWALK ARE | | | DIFFERENT THAN THE TYPE OF PAVERS PROPOSED ON THE | | | PLAZAS AND PEDESTRIAN AREAS INSIDE THE PROPERTY LINE. | | | STAFF RECOMMENDS BOTH TO BE THE SAME, OR HAVE A | | | DIFFERENCIATION ONLY WHEN THE DESIGN JUSTIFY THE | | | CHANGE, NOT BASED ON PROPERTY LINE. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
02-27-2019 |
Time |
14:19 |
Sent To |
|
|
| Notes |
| 2019-02-28 10:44:38 | OUTSTANTING COMMENTS FROM 5/11/17 REVIEW: | | | 4.NOT SATISFIED- PROPOSED CURB CUT ON 4TH STREET | | | EXCEEDS THE MAXIMUM 25 FEEET IN WIDTH ALLOWED. THE 6 | | | FOOT WIDE MEDIAN IS STILL CONSIDERED PART OF THE CURB | | | CUT. | | | 7 AND 8. SATISFIED | | | 9. NOT SATISFIED- CIVIL DRAWINGS (SHEET 9) SHOW RETAIL | | | AREA AT ELEVATION 15.50 WHILE SIDEWALK IS AT ELEVATION | | | APPROX. 12-13. SHEET 4 SHOWS RETAIL AT ELEVATION 13. | | | | | | OUTSTANDING COMMENTS FROM 11/27/19 REVIEW | | | 1. SATISFIED | | | 2. SATISFIED- PLEASE PROVIDE COLORED ELEVATIONS WITHOUT | | | SHADES TO CLEARLY CONVEY THE DIFFERENT MATERIALS OF THE | | | ELEVATION. PLEASE EXPLAIN WHAT IS THE DIFFERENCE | | | BETWEEN THE PREVIOUS FACADE DETAIL AND THE PROPOSED. | | | 3. NOT SATISFIED - PLEASE CONSIDE LOCATING THE FIRE | | | DEPARTMENT CONNECTION ON THE STAIR WALL OR LOCATE THEM | | | CLOSER TO THE STAIR WALL. TEH FDC CONNECTION ON 4TH | | | STREET IS ALSO LOCATED ON THE PEDESTRIAN PATH AREA. | | | 4. SATISFIED- PRINTING FOR LANDSCAPE DRAWINGS WAS NOT | | | DONE TO PRESERVE THE SCALE. STAFF WAS NOT ABLE TO | | | MEASURE INDICATED DIMENSIONS. | | | 5. NOT SATISFIED - LANDSCAPE MATERIALS HAVE | | | SUBSTANTIALLY CHANGED FROM ORIGINAL APPROVAL IN | | | DETRIMENT OF THE QUALITY OF THE PUBLIC REALM. SEE | | | LANDSCAPE COMMENTS. | | | 6. SATISFIED- PLEASE DIMENSION PARKING SPACES TO | | | CONFIRM COMPLIANCE WITH MINIMUM REQUIREMENTS. SPACE | | | ADJACENT TO A WALL OR COLUMN SHALL BE WIDER (SEC | | | 94-111(C)) | | | 7. NOT SATISFIED- PLEASE PROVIDE SECTIONS TO CONFIRM | | | THE LEVELS ARE MAINTAINED . CURB CUT SHALL BE DESIGNED | | | IN A WAY THAT THE SIDEWALK LEVEL IS MAINTAINED ACROSS | | | CURB CUT AND NOT LOWERED TO THE ROAD LEVEL. PEDESTRIANS | | | GET PRIORITY, NOT THE CARS. | | | 8. NOT SATISFIED- TABLE PROVIED INDICATES THAT 25 UNITS | | | ARE BELOW THE MINIMUM 550 SF UNIT SIZE PERMITTED BY THE | | | CODE FOR REGUALR UNITS. THOSE UNITS SHALL BE CLASSIFIED | | | AS MICRO UNITS AND MUST COMPLY WITH SPECIFIC MICROUNIT | | | REQUIREMENTS. PLEASE SEE SECTION 94 106 (8A) AND | | | RESPOND HOW THE PROJECT IS GOING TO ADDRESS THE | | | SPECIFIC REQUIREMENTS. | | | 9. NOT SATISFIED - TABLE PROVIDED INDICATES 8 HOTEL | | | ROOMS ARE LESS THAN THE 350 SF REQUIRED FOR FULL | | | SERVICE HOTELS. | | | 10. SATISFIED-PLEASE INDICATE THE LOCATION OF THE CAR | | | LIFTS. | | | 11. SATISFIED- PLEASE INDICATE THE TENANT ACCESS TO THE | | | BIKE STORAGE ROOM. | | | | | | ADDITIONAL COMMENTS FROM 1/28/19 SUBMITTAL: | | | 1. PLEASE CORRECT THE FAR NUMBER IN SHEET A0.0A AND | | | A0.07, THE TWO NUMBERS DO NOT MATCH. | | | 2.PEDESTRIAN CROSSING AT THE CORNER OF 4RD AND DIXIE | | | HWAY SHALL BE SPLIT INTO TWO DIRECTIONAL RAMPS. | | | 3. THERE ARE TWO BIKE RACKS INDICATED ON THE OFFICE | | | PLAZA THAT CONFLICT WITH THE WATER FEATURE PROPOSE AND | | | THE PATH OF TRAVEL FOR PEDESTRIANS. PLEASE RELOCATE. | | | 4.LIGHT POLES INDICATED IN SHEETL1-150 SHALL MEET THE | | | DOWNTOWN CITY STANDARD FOR POLE AND FIXTURE. | | | 5. A LIGHTING PROTOMETRIC SHALL BE SUBMITTED FOR THE | | | EXTERIOR GROUND FLOOR AREA TO CONFIRM COMPLIANCE WITH | | | THE MINIMUM REQUIRED 0.6 FOOTCANDLES AT THE CURB SIDE | | | ONE FOOT ABOVE GROUND. | | | 6. PLEASE SUBMIT DETAILS FOR THE BIKE RACKS TO CONFIRM | | | SPACE PROVIDED IS ADEQUATE. | | | 7. PLEASE CONFIRM THE EXFILTRATION TRENCH WILL NOT | | | CONFLICT WITH PROPOSED TREES ALONG DIXIE HWAY. | | | 8. PLEASE RECONSIDER PROPOSED GREESE TRAP UNDER HOTEL | | | OUTDOOR DINING AREA. | | | | | | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA | | | APONTE AT 561-822-1439 | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
11-27-2018 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
11-27-2018 |
Time |
14:22 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
10-26-2018 |
Time |
15:53 |
Sent To |
|
|
| Notes |
| 2018-11-26 16:40:48 | OUTSANTING COMMENTS FROM 5/11/17 REVIEW. | | | 4.PROPOSED CURB CUT ON 4TH STREET EXCEEDS THE MAXIMUM | | | 25 FEEET IN WIDTH ALLOWED. | | | 7 AND 8. MONUMENT SIGN STILL SHOWN IN SHEET A2.02. | | | PLEASE UPDATE THE RENDERINGS, AS THEY STILL SHOW THE | | | TALL FOUNTAIN AT THE CORNER OF 4TH AND QUADRILLE. SHEET | | | A0.01 STILL INCLUDES A DIAGRAM WITH PREVIOUS FOUNTAIN. | | | 9. CIVIL DRAWINGS STILL SHOW RETAIL AREA AT THE SAME | | | ELEVATION THAN THE RESIDENTIAL AND OFFICE/HOTEL | | | BUILDING. ELEVATION DIFFERENCE OF 3 FEET BETWEEN THE | | | SIDEWALK LEVEL AND THE RETAIL LEVEL WILL NEGATIVELY | | | IMPACT THE PEDESTRIAN ENVIRONMENT ALONG DIXIE HWAY. | | | LANDSCAPE DRAWINGS SHOW RETAIL AT THE DIXIE ELEVATION. | | | | | | ADDITIONAL COMMENTS | | | 1. PLEASE INDICATE THE MATERIAL FOR SIDEWALKS. SHEET | | | L1-110 IS MISSING KEY. | | | 2. PLEASE PROVIDE COLORED ELEVATIONS WITHOUT SHADES TO | | | CLEARLY CONVEY THE DIFFERENT MATERIALS OF THE | | | ELEVATION. PLEASE EXPLAIN WHAT IS THE DIFFERENCE | | | BETWEEN THE PREVIOUS FACADE DETAIL AND THE PROPOSED. | | | 3. FIRE DEPARTMENT CONNECTION PROPOSED ON 5TH STREET | | | SHALL NOT BE PLACED ON THE SIDEWAL.K | | | 4. PRINTING FOR LANDSCAPE DRAWINGS WAS NOT DONE TO | | | PRESERVE THE SCALE. STAFF WAS NOT ABLE TO MEASURE | | | INDICATED DIMENSIONS. | | | 5. LANDSCAPE MATERIALS HAVE SUBSTANTIALLY CHANGED FROM | | | ORIGINAL APPROVAL IN DETRIMENT OF THE QUALITY OF THE | | | PUBLIC REALM. SEE LANDSCAPE COMMENTS. | | | 6. PLEASE DIMENSION PARKING SPACES TO CONFIRM | | | COMPLIANCE WITH MINIMUM REQUIREMENTS. SPACE ADJACENT TO | | | A WALL OR COLUMN SHALL BE WIDER (SEC 94-111(C)) | | | 7. CURB CUT SHALL BE DESIGNED IN A WAY THAT THE SIDEWLK | | | LEVEL IS MAINTAINED ACROSS CURB CUT AND NOT LOWERED TO | | | THE ROAD LEVEL. PEDESTRIANS GET PRIORITY, NOT THE CARS. | | | 8. PLEASE PROVIDE A TABLE INDICATING THE SIZE OF THE | | | RESIDENTIAL UNITS TO CONFIRM COMPLIANCE WITH MINIMUM | | | AVERAGE OF 800SF. | | | 9. PLEASE INDICATE THE SIZE OF THE HOTEL ROOMS TO | | | CONFIRM COMPLIANCE WITH FULL SERVICE HOTEL DEFINITION. | | | 10. PLEASE INDICATE THE LOCATION OF THE CAR LIFTS. | | | 11. PLEASE INDICATE THE TENANT ACCESS TO THE BIKE | | | STORAGE ROOM. | | | | | | | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
05-11-2017 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
05-11-2017 |
Time |
17:23 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
05-11-2017 |
Time |
17:23 |
Sent To |
|
|
| Notes |
| 2017-05-11 13:04:13 | 1. SATISFIED- VARIANCE FOR THE MAXIMUM SETBACK ALONG | | | QUADRILLE BLVD GRANTED FOR 76?. PROJECT PROPOSES A | | | SETBACK OF 78?-5?. DAC APPROVAL NEEDED. | | | 2.SATISFIED- VARIANCE FOR ACTIVE USES ABOVE 1ST STORY | | | ALONG QUADRILLE BLVD GRANTED TO REDUCE FROM 60% TO 47%. | | | REVISED PROJECT PROPOSED 41%. DAC APPROVAL NEEDED. | | | 3. NOT SATISFIED. PLEASE CALCULATE THE SHARED PARKING | | | FOLLOWING TABLE IV-10 IN SECTION 94-110. IT IS OK TO | | | COUNT THE FITNESS AND TENNIS CENTER AS HOTEL AMENITIES. | | | A SPECIAL EVENT PARKING PERMIT WILL BE REQUIRED FOR | | | EACH EVENT AT SUCH FACILITY.- IS THE ENTIRE PROJECT | | | FUNCTIONING WITH SHARED PARKING? IS YES, NO SPACES CAN | | | BE ASSIGNED TO A PARTICULAR USE/TENANT.-REVISE PARKING | | | CALCULATION TO INCLUDE DAY CARE, FITNESS CENTER, | | | TENNIS/EVENT AREA, HOTEL RESTAURANTS, AND ANY OTHER | | | ADDITIONAL USE. | | | 4.NOT SATISFIED. A VARIANCE FROM DAC WILL BE REQUIRED | | | IF THE CURB CUT IS TO EXCEED THE MAXIMUM 25' ALLOWED.- | | | CURB CUT ALONG QUADRILLE BLVD IS ALLOWED MAXIMUM WIDTH | | | OF 25?. CURRENT CURB CUT IS 40?. | | | 5. SATISFIED. BUILDING + MECHANINCAL IS BELOW MAXIMUM | | | ALLLOWABLE HEIGHT.-MECHANICAL ENCROACHMENT EXCEEDS | | | MAXIMUM 20' ALLOWED. | | | 6. SEE NO. 3.- PLEASE INCLUDE A TABLE LISTING THE SEC | | | 94-110(D) PROCEDURE FOR THE SHARE PARKING CALCULATION. | | | MINIMUM PARKING SPACES REQUIRED BY THE SHARED PARKING | | | CALCULATION SHALL NOT BE MARKED AS DESIGNATED SPACE FOR | | | A PARTICULAR USE. | | | 7. NOT SATISFIED. LA DRAWINGS STILL SHOW MONUMENT | | | SIGN.-MONUMENT SIGNS ARE NOT PERMITTED IN DMP AREA. | | | 8. NOT SATISFIED. WALL DO NOT MEET CPTED PRINCIPLES. | | | PROPOSED DESIGN LIMITS THE PEDESTRIAN CIRCULATION. | | | LOWER FOUNTAIN WALL-PLEASE EXPLAIN WALLS DEPICTED IN | | | RENDERINGS OF ON OPEN SPACES. OPEN SPACES SHALL HAVE | | | DIRECT CONTACT WITH THE STREET AND IT SHALL NOT BLOCK | | | VIEW OF THE INTERIOR SPACES FROM THE STREET. | | | 9. SATISFIED, BUT PLEASE CLARIFY IF SECTIN 4 ON SHEET | | | L3-100 IS CORRECT. IT SHOWS A 2 FEET DIFFERENCE BETWEEN | | | THE DIXIE HWAY SIDEWALK LEVEL AND THE RETAIL | | | AREA.-CONSIDERING THE UNDERGROUND PARKING IS REMOVED, | | | STAFF RECOMMENDS THE ACTIVE USES ALONG DIXIE HWAY TO BE | | | LOCATED AT GRADE AND CLOSER TO THE STREET. | | | 10. SATISFIED. PLEASE LIST THE NUMBER OF BIKE SPACES | | | PROVIDED IN EACH AREA ON THE FLOOR PLAN.- STAFF | | | RECOMMENDS BIKE STORAGE TO BE LOCATED AT THE GROUND | | | LEVEL DUE TO SAFETY CONCERNS. | | | 11. SATISFIED.-PLEASE INDICATE THE LOCATION OF CHANGING | | | FACILITIES AND SHOWERS ASSOCIATED WITH OFFICE BUILDING. | | | 12.SATISFIED.- PLEASE INDICATE THE TOTAL NUMBER OF | | | SPACES PROVIDE AT GROUND LEVEL.- STAFF RECOMMENDS SOME | | | BIKE PARKING SPACES BE PROVIDED FOR HOTEL EMPLOYEES. | | | 13. SATISFIED.-STAFF RECOMMENDS THE LOCATION OF A BIKE | | | SHARING STATION ON SITE. | | | ADDITIONAL COMMENTS BASED ON REVISED DRAWINGS: | | | 14. THE AREA WITHIN THE MINIMUM SETBACK SHALL BE | | | TREATED AS AN EXTENSION OF THE PUBLIC REALM. SEATING | | | AREA ALONG 4TH STREET IS SURROUNDED BY A PLANTING AREA | | | THAT LEAVES ONLY A 6 FEET WIDE SIDEWLK NEXT TO THE | | | CURB. THE SEATING AREA SHALL BE OPEN/CONNECTED WITH THE | | | SIDEWALK, IT SHALL FEET LIKE PART OF THE PUBLIC REALM, | | | NOT A PRIVATE TERRACE. MINIMUM SIDEWALK WIDTH IS 8 | | | FEET. | | | 15. STREET TREES SHALL BE PLANTED ALONG THE SIDEWALK, | | | NEXT TO THE CURB, WITH BASE PLANITNG OR IN TREE GRATES. | | | ALONG 4TH STREET, THE TREES BETWEEN THE CURB CUTS SHALL | | | BE NEXT TO THE CURB ON TREE GRATES. | | | 16. SW OPEN SPACE WILL QUALIFY FOR THE 5% PUBLIC OPEN | | | SPACE REQUIREMENT, BUT PLEASE LOOK AT TABLE IV-7 AND | | | DEMONSTRATE THE SPACE MEETS ALL THE REQUIREMENTS FOR | | | THE PLAZA TYPE. MINIMUM REQUIRED SETBACK CANNOT BE | | | COUNTED AS PART OF THE PUBLIC OPEN SPACE. NUMBERS ON | | | SHEET L0-002 DO NOT MATCH NUMBERS ON SHEET A0.09. | | | 17. MINIMUM WIDTH OF SIDEWALK SHALL BE 8 FEET. MINIMUM | | | SIDEWALK WIDTH FOR DROP-OFF AREA IS 10 FEET. | | | 18. PLEASE INDICATE TEH PEDESTRIAN CROSSWALKS AT ALL | | | INTERSECTIONS. | | | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA | | | APONTE AT 561-822-1439. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
03-08-2017 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
03-08-2017 |
Time |
13:06 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
03-08-2017 |
Time |
13:06 |
Sent To |
|
|
| Notes |
| 2017-03-08 13:11:56 | 1. VARIANCE FOR THE MAXIMUM SETBACK ALONG QUADRILLE | | | BLVD GRANTED FOR 76?. PROJECT PROPOSES A SETBACK OF | | | 78?-5?. DAC APPROVAL NEEDED. | | | 2. VARIANCE FOR ACTIVE USES ABOVE 1ST STORY ALONG | | | QUADRILLE BLVD GRANTED TO REDUCE FROM 60% TO 47%. | | | REVISED PROJECT PROPOSED 41%. DAC APPROVAL NEEDED. | | | 3. REVISE PARKING CALCULATION TO INCLUDE DAY CARE, | | | FITNESS CENTER, TENNIS/EVENT AREA, HOTEL RESTAURANTS, | | | AND ANY OTHER ADDITIONAL USE. | | | 4. CURB CUT ALONG QUADRILLE BLVD IS ALLOWED MAXIMUM | | | WIDTH OF 25?. CURRENT CURB CUT IS 40?. | | | 5. MECHANICAL ENCROACHMENT EXCEEDS MAXIMUM 20? ALLOWED. | | | 6. PLEASE INCLUDE A TABLE LISTING THE SEC 94-110(D) | | | PROCEDURE FOR THE SHARE PARKING CALCULATION. MINIMUM | | | PARKING SPACES REQUIRED BY THE SHARED PARKING | | | CALCULATION SHALL NOT BE MARKED AS DESIGNATED SPACE FOR | | | A PARTICULAR USE. | | | 7. MONUMENT SIGNS ARE NOT PERMITTED IN DMP AREA. | | | 8. PLEASE EXPLAIN WALLS DEPICTED IN RENDERINGS OF ON | | | OPEN SPACES. OPEN SPACES SHALL HAVE DIRECT CONTACT WITH | | | THE STREET AND IT SHALL NOT BLOCK VIEW OF THE INTERIOR | | | SPACES FROM THE STREET. | | | 9. CONSIDERING THE UNDERGROUND PARKING IS REMOVED, | | | STAFF RECOMMENDS THE ACTIVE USES ALONG DIXIE HWAY TO BE | | | LOCATED AT GRADE AND CLOSER TO THE STREET. | | | 10. STAFF RECOMMENDS BIKE STORAGE TO BE LOCATED AT THE | | | GROUND LEVEL DUE TO SAFETY CONCERNS. | | | 11. PLEASE INDICATE THE LOCATION OF CHANGING FACILITIES | | | AND SHOWERS ASSOCIATED WITH OFFICE BUILDING. | | | 12. STAFF RECOMMENDS SOME BIKE PARKING SPACES BE | | | PROVIDED FOR HOTEL EMPLOYEES. | | | 13. STAFF RECOMMENDS THE LOCATION OF A BIKE SHARING | | | STATION ON SITE. | | | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA | | | APONTE AT 561-822-1439. |
|
|
| |