Plan Review Details - Project Z16110016
Plan Review Stops For Project Z16110016
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 12-14-2016 Cont ID  
Sent By rbrown Date 12-14-2016 Time 10:10 Rev Time 0.00
Received By rbrown Date 12-14-2016 Time 10:10 Sent To  
Notes
2016-12-14 10:19:20DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR PERMITTING.
  
 2. THE PROPOSED BUILDING WILL BE IN A FLOOD ZONE FOR
 WHICH THE BASE FLOOD ELEVATION IS EL 7 FEET NGVD. THE
 ELEVATION OF THE FIRST FLOOR OF THE BUILDING AND ALL
 ASSOCIATED MECHANICAL EQUIPMENT (CHILLERS, GENERATORS
 ETC.) SHALL BE 12 INCHES (FREEBOARD) ABOVE THAT BASE
 FLOOD ELEVATION.
  
 3. ACCESSIBLE PARKING. VALETS MAY NOT BE ABLE TO
 OPERATE VEHICLES WHICH HAVE BEEN MODIFIED FOR THE USER,
 SO VALET PARKING CANNOT COUNT AS ANY OF THE REQUIRED
 ACCESSIBLE PARKING. THE PARKING TABLE ON PROJECT DATA
 SHEET A0.0.05 STATES THAT 65 PARKING SPACES WILL BE
 PROVIDED BUT ONLY 2 ACCESSIBLE PARKING SPACES ARE
 PROPOSED. 3 ACCESSIBLE PARKING SPACES ARE REQIRED AS
 THE MINIMUM NUMBER OF ACCESSIBLE PARKING SPACES
 PROVIDED SHALL BE IN ACCORDANCE WITH SECTION 208.2 OF
 FLORIDA ACCESSIBILITY CODE.
  
 4. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS,
 GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND
 OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS,
 SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC.
  
 5. THIS PROJECT WILL BE SUBJECT TO ART IN PUBLIC PLACES
 (AIPP) ASSESSMENT. FOR ADVICE ON THE PROVISION OF
 PUBLIC ARTWORK IN LIEU OF THE AIPP ASSESSMENT, CONTACT
 SYBILLE WELTER, ART IN PUBLIC PLACES COORDINATOR, AT
 (561) 822-1521, OR BY EMAIL: [email protected]
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 3 Status P Date 03-13-2017 Cont ID  
Sent By mkhan Date 03-13-2017 Time 10:36 Rev Time 0.00
Received By mkhan Date 03-13-2017 Time 10:35 Sent To  
Notes
2017-03-13 11:19:33CITY OF WEST PALM BEACH
 ENGINEERING SERVICES DEPARTMENT
  
 DATE: 03/13/2017
  
 PROJECT NAME: PALM HARBOR MARINA HOTEL - Z16110016 -
 300 N FLAGLER DRIVE
  
 3RD REVIEW RESPONSE ON "CONCEPTUAL ENGINEERING PLANS":
 PASSED WITH PROVISO (SAME AND IN CONTINUATION OF THE
 2ND REVIEW COMMENTS)
  
 3RD SUBMITTAL OF THE CIVIL PLANS WAS RECEIVED AT THE
 DEV. SERVICES DEPT. ON 2/21/2017 WHICH HAS DID NOT HAVE
 PROPER REVISIONS FROM THE 2ND ROUND COMMENTS:
  
 ORIGINAL COMMENT FROM 2ND REVIEW: FOR PAVEMENT
 RESTORATION REFER TO CITY STANDARD DETAILS P-4 AND
 GC-9. EXTENTS OF PAVEMENT RESTORATION SHOWN ON THE
 PLANS (IN RESPONSE TO COMMENT NO. 18) ARE NOT ADEQUATE.
  
 NEW COMMENT: CONCEPTUAL ENGINEERING PLANS DO NOT SHOW
 PAVEMENT RESTORATION PROPERLY. LIMIT SHALL BE 50-FEET
 ON EACH SIDE OF THE PROPOSED UTILITY PIPES FROM THE
 EDGE OF THE TRENCH AS SHOWN ON CITY'S STD. DETAILS P-4
 AND GC-9. PLEASE CORRECT THIS AND SHOW THE EXTENT ON
 THE FINAL ENGINEERING PLANS DURING 'ENGINEERING REVIEW
 APPLICATION' STAGE. FOR GARBAGE COLLECTION/SANITATION
 PLANS NOW NEED APPROVAL FROM PETER BIENIEK, PUBLIC
 WORKS DIRECTOR.
  
 TO RE-ITERATE THE MAIN PREVIOUS COMMENT/S : ALL
 PREVIOUSLY ACKNOWLEDGED RESPONSES AND ANY AND ALL
 COMMENTS THOSE HAVE NOT BEEN SATISFIED YET NEED TO BE
 ADDRESSED IN THE 'FINAL ENGINEERING PLANS' WHICH NEED
 TO BE SUBMITTED TO THE ENGINEERING DEPARTMENT ALONG
 WITH AN 'ENGINEERING DEVELOPMENT APPLICATION' PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 MOSTAQUE KHAN, P.E.
 LAND DEVELOPMENT ENGINEER
 [email protected]
 561-494-1124 (OFFICE)
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 2 Status P Date 02-10-2017 Cont ID  
Sent By mkhan Date 02-10-2017 Time 09:49 Rev Time 0.00
Received By mkhan Date 02-10-2017 Time 09:48 Sent To  
Notes
2017-02-10 09:50:21CITY OF WEST PALM BEACH
 ENGINEERING SERVICES DEPARTMENT
  
 DATE: 02/10/2017
  
 PROJECT NAME: 300 N FLAGLER DRIVE - PALM HARBOR MARINA
 HOTEL - Z16110016
  
 2ND REVIEW RESPONSE: PASSED WITH PROVISO
  
 AFTER A REVIEWING THE REVISED PLANS AND THE RESPONSES
 TO THE PPRC COMMENTS (RECEIVED ON 1/9/2017), IT APPEARS
 THAT MOST OF THE COMMENTS HAVE BEEN ACKNOWLEDGED AND
 NOTED AS: "TO BE ADDRESSED AT FINAL ENGINEERING".
 PLEASE ADDRESS THESE COMMENTS AND SUBMIT THE "FINAL
 ENGINEERING PLANS" TO THE ENGINEERING DEPARTMENT ALONG
 WITH AN 'ENGINEERING DEVELOPMENT APPLICATION' PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
 FOR PAVEMENT RESTORATION REFER TO CITY STANDARD DETAILS
 P-4 AND GC-9. EXTENTS OF PAVEMENT RESTORATION SHOWN ON
 THE PLANS (IN RESPONSE TO COMMENT NO. 18) ARE NOT
 ADEQUATE? PLEASE REVISE PLANS.
  
 MOSTAQUE KHAN, P.E.
 LAND DEVELOPMENT ENGINEER
 [email protected]
 561-494-1124 (OFFICE)
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status F Date 12-12-2016 Cont ID  
Sent By mkhan Date 12-14-2016 Time 17:08 Rev Time 8.00
Received By mkhan Date 12-12-2016 Time 17:08 Sent To  
Notes
2016-12-12 17:11:14CITY OF WEST PALM BEACH
 PUBLIC WORKS DEPARTMENT
 ENGINEERING DIVISION
  
 DATE: 12/14/2016
  
 Z16110016: 300 N. FLAGLER DR. - PALM HARBOR MARINA
 HOTEL
  
 THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT
 HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. SOLID WASTE YARDAGE CALCULATION WILL NEED TO BE
 SUBMITTED AS PART OF THE FINAL DESIGN TO VERIFY THAT
 THE DESIGN INCLUDES APPROPRIATE NUMBER AND SIZE OF
 DUMPSTERS/GARBAGE RECEPTACLES. PLEASE SHOW ON THE PLAN
 IF A COMPACTOR IS PROPOSED TO REDUCE THE YARDAGE OF
 WASTE THAT WILL NEED TO BE COLLECTED;
  
 2. PLEASE PROVIDE AN AUTOTURN ANALYSIS DEMONSTRATING
 THE SOLID WASTE COLLECTION VEHICLE CAN ACCESS THE
 PROPOSED DUMPSTER AND COMPACTOR LOCATIONS. THE TRASH
 DUMPSTER/COMPACTORS MUST LOCATED IN AREAS EASILY
 SERVICED BY THE CITY SANITATION EQUIPMENT AND MANPOWER
 PER SECTION 74-35(A)(5) OF THE CODE OF ORDINANCES. IF A
 ROLL-OFF COMPACTOR IS PROPOSED, PLEASE PROVIDE A LETTER
 FROM THE PRIVATE PROVIDER VERIFYING THAT THEY CAN
 PROVIDE SERVICE WITH THE CONFIGURATION SHOWN ON THE
 PLANS;
  
 3. PLEASE INCLUDE THE CITY OF WEST PALM BEACH STANDARD
 DETAIL FOR THE DUMPSTER ENCLOSURE ON THE PLANS. MINIMUM
 DIMENSIONAL (E.G. THE GATE WIDTH MUST BE A MINIMUM OF
 12.5 FEET) REQUIREMENTS FOR THE ENCLOSURE ARE LISTED IN
 CODE OF ORDINANCES, SECTION 94-444(B) OF THE CODE OF
 ORDINANCES. CITY STANDARD DETAIL GC-8 MAY BE DOWNLOADED
 AT:
  
 HTTP://WPB.ORG/ENGINEERING/ENGINEERING-SERVICES/ENGINEE
 RING-STANDARDS/
  
 4. IF ROLL OUT TYPE DUMPSTER IS PROPOSED, PLEASE NOTE
 ON THE PLANS THAT: 'OWNER IS RESPONSIBLE TO ROLL OUT
 THE DUMPSTER OUTSIDE THE ENCLOSURE PRIOR TO CITY?S
 SANITATION CREW PICK UP GARBAGE'.
  
 5. PLEASE REVISE THE LANDSCAPE PLAN TO SHOW LOCATIONS
 OF ALL WATER METERS, VALVES, CLEAN-OUTS, LIGHT POLES,
 ETC. ROOT BARRIERS MAY BE REQUIRED WHERE PLANTINGS ARE
 NEAR UNDERGROUND STORMWATER, SANITARY, OR POTABLE WATER
 LINES;
  
 6. CITY'S GARBAGE COLLECTOR TRUCK NEEDS TO HAVE NO LESS
 THAN 14' HIGH VERTICAL CLEARANCE AND 12' HORIZONTAL
 CLEARANCES FOR THE TRUCK TO DRIVE THROUGH;
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL:
  
 7. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL
 BE REQUIRED FROM THE ENGINEERING DIVISION OF THE PUBLIC
 WORKS DEPARTMENT. THE ENGINEERING DEVELOPMENT APPROVAL
 APPLICATION FORMS CAN BE DOWNLOADED AT:
  
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 8. PLEASE SUBMIT THE LATEST VERSION OF THE 'AUTO-CALC
 CERTIFIED COST ESTIMATE FORM' FOR SUBMISSION TO CITY OF
 WEST PALM BEACH PUBLIC WORKS DEPARTMENT. THIS FORM CAN
 BE DOWNLOADED FROM THE FOLLOWING LINK:
  
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 9. SUBMIT WITH THE ENGINEERING DEVELOPMENT APPROVAL
 APPLICATION SIGNED & SEALED ENGINEER/MEP WATER AND
 SANITARY SEWER CALCULATION (AVERAGE AND PEAK WITH
 PEAKING FACTOR). SUBMIT CALCULATIONS TO VALIDATE METER
 SIZE SELECTION. SHOW THESE CALCULATIONS ON THE UTILITY
 PLAN SHEET AS WELL;
  
 10. PLEASE INCLUDE APPLICABLE CITY OF WEST PALM BEACH
 STANDARD DETAILS TO THE DETAILS SHEET. CONTACT THE
 ENGINEERING SERVICES DEPARTMENT FOR THE LATEST REVISED
 DETAILS IN CAD FORMAT. CITY'S STANDARD DETAILS (IN PDF
 FILE FORMAT) CAN BE DOWNLOADED FROM THE FOLLOWING SITE:
  
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 THE FOLLOWING COMMENTS ARE FOR WATER AND SEWER:
  
 11. PLACEMENT OF THE PROPOSED METER, BACKFLOW
 PREVENTER, DCDA ETC. SHALL BE INSTALLED PER THE CITY'S
 STANDARD DETAILS. REVISE THE LOCATION OF THE FIRE
 HYDRANT. WATER METER SHOULD BE INSIDE AN 'UTILITY
 EASEMENT' JUST INSIDE THE PROPERTY NEAR THE
 RIGHT-OF-WAY AND ACCESSIBLE;
  
 12. ENLARGE THE AREA (PREFERABLY TO A SCALE OF 1"=10')
 TO SHOW DETAILS OF THE PROPOSED 4-INCH WATER METER;
  
 13. EXISTING WATER SERVICE CONNECTIONS SERVING THE
 PROPERTY, IF NOT USED, ARE TO BE CUT AND CAPPED AT THE
 MAIN. DE-ACTIVATED/INACTIVE PIPELINES LARGER THAN 2"
 DIAMETER WILL BE REMOVED. PLEASE LABEL PIPE SIZE AND
 MATERIAL AND ADD NOTES TO THE UTILITY PLANS
 ACCORDINGLY;
  
 14. INCLUDE A PROFILE FOR THE PROPOSED SERVICE LATERAL
 WITH GROUND ELEVATIONS ABOVE THE PIPE;
  
 15. PROPOSED SANITARY SEWER MANHOLES SHALL NOT BE
 INSTALLED ON THE EXISTING SIDEWALK. INCLUDE IN THE
 PLANS CITY'S STANDARD DETAIL FOR MANHOLE ON THE DETAILS
 SHEET;
  
 16. PROVIDE UTILITY CROSSING INFORMATION. SHOW CONFLICT
 INFORMATION (BOTTOM AND TOP OF CROSSING PIPES) AT THE
 CONFLICT POINTS OF ALL WATER, STORM AND SANITARY SEWER
 PIPES AS WELL AS OTHER FRANCHISE UTILITIES;
  
 17. CCTV RECORD (VIDEO AND TV LOG) OF THE EXISTING AND
 NEW SANITARY SEWER (FULL LENGTH FROM MH TO MH) WILL BE
 REQUIRED AS PART OF THE PROJECT CLOSE-OUT SUBMITTALS;
  
 18. PAVEMENT RESTORATION WILL BE REQUIRED FOR THE
 PROPOSED SANITARY SEWER CONNECTION TO THE EXISTING
 MANHOLE WITHIN THE RIGHT-OF-WAY;
  
 19. PLEASE NOTE THAT: AS OF DECEMBER 20, 2015 THE CITY
 OF WEST PALM BEACH CROSS-CONNECTION CONTROL MANUAL HAS
 BEEN REVISED, MAKING KNOWN THAT "ALL BACKFLOW DEVICES
 MUST BE LEAD FREE." FOR MORE INFORMATION REFER TO THE
 LINK BELOW:
  
 HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI
 CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
  
 20. THE PROPOSED FIRE DEPARTMENT CONNECTION SHALL BE
 WITHIN 150 FEET OF A FIRE HYDRANT. LANDSCAPE PLAN SHALL
 SHOW LOCATIONS OF ALL WATER METERS, VALVES, CLEAN-OUTS,
 LIGHT POLES, ETC. ROOT BARRIERS MAY BE REQUIRED WHERE
 PLANTINGS ARE NEAR UNDERGROUND STORMWATER, SANITARY, OR
 POTABLE WATER LINES.
  
 MOSTAQUE KHAN, P.E.
 LAND DEVELOPMENT ENGINEER
 [email protected]
 561-494-1024 (OFFICE)
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status F Date 01-18-2017 Cont ID  
Sent By pleduc Date 01-18-2017 Time   Rev Time 0.00
Received By pleduc Date 01-18-2017 Time 11:10 Sent To  
Notes
2017-01-18 11:18:092ND REVIEW RESPONSE
  
  
 AFTER A REVIEW OF THE PPRC RESPONSE DATED JANUARY 6,
 2017, FROM ADACHE GROUP ARCHITECTS TO ANA MARIA APONTE,
 CITY URBAN DESIGNER THE PREVIOUSLY SUBMITTED FIRE
 PREVENTION BUREAU COMMENTS HAVE BEEN ADDRESSED WITH THE
 EXCEPTION OF # 6 AND # 7 RELATING TO THE PROPOSED BEING
 A HIGH RISE BUILDING.
  
 ACCORDING TO THE FLORIDA FIRE PREVENTION CODE, NFPA 1,
 CHAPTER 3, DEFINITIONS -
  
 3.3.30.6* HIGH-RISE BUILDING. A BUILDING WHERE THE
 FLOOR OF AN OCCUPIABLE STORY IS GREATER THAN 75 FT (23
 M) ABOVE THE LOWEST LEVEL OF FIRE DEPARTMENT VEHICLE
 ACCESS.
  
 ACCORDING TO THE PROPOSED PROJECT SUBMITTAL PLAN
 SHEETS, SHEET A.2.1.02 INDICATES T.O. ROOF FINISH 9TH
 FLOOR AT 74'.8" WHICH IS FROM LEVEL 1, 0'0"; HOWEVER,
 GROUND IS INDICATED A -3'4"
  
  
 IT APPEARS THE LOWEST LEVEL OF FIRE DEPARTMENT ACCESS
 IS FROM THE GROUND LEVEL AND/OR FLAGER DRIVE WHICH
 MOVES THE HEIGHT OF THE 9TH FLOOR OVER 75' AND MEETING
 THE DEFINITION OF THE PROPOSED PROJECT AS A HIGH RISE.
  
  
  
 THE BUREAU CAN AGREE TO MOVE THIS PROJECT FORWARD WITH
 APPROVAL OF THIS SUBMITTED PROJECT; HOWEVER, IT IS
 IMPORTANT FOR DESIGN PURPOSES AND TO AVOID FUTURE PLAN
 SUBMITTAL DELAYS TO AGREE ON A DEFINITION.
  
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 WEST PALM BEACH FIRE RESCUE
 561-804-4709
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 12-08-2016 Cont ID  
Sent By pleduc Date 12-08-2016 Time   Rev Time 0.00
Received By pleduc Date 12-08-2016 Time 17:18 Sent To  
Notes
2016-12-08 17:33:51THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC,
 FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM
 BEACH FIRE RESCUE.
  
 THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE
 DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE.
 ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS
 ARE SUBMITTED FOR PERMIT.
  
 THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE
 PROPOSED PROJECT.
  
  
 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY
 WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE
 PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A
 PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED
 TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN
 STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY
 MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER
 PROTECTION.
  
  
 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY
 IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING
 ALL CONSTRUCTION ACTIVITIES.
  
  
 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM
 ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION.
 ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND
 AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT
 WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS.
  
  
 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE
 REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE
 ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS.
  
  
 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH
 THE 5TH EDITION OF THE FLORIDA FIRE PREVENTION CODE,
 INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES.
  
  
 6. THIS PROPOSED PROJECT IS DEFINED IN 214 FLORIDA FIRE
 PREVENTION CODE AS A HIGH RISE AND SHALL COMPLY WITH
 THE APPLICABLE CODE.
  
 NFPA 1 CHAPTER 3, DEFINITIONS
 3.3.30.6* HIGH-RISE BUILDING. A BUILDING WHERE THE
 FLOOR OF AN OCCUPIABLE STORY IS GREATER THAN 75 FT (23
 M) ABOVE THE LOWEST LEVEL OF FIRE DEPARTMENT VEHICLE
 ACCESS.
  
 NFPA 1, CHAPTER 20 OCCUPANCY FIRE SAFETY
 20.16 SPECIAL STRUCTURES AND HIGH-RISE BUILDINGS.
 20.16.1 APPLICATION.
 20.16.1.1 NEW AND EXISTING SPECIAL STRUCTURES AND
 HIGH-RISE BUILDINGS SHALL COMPLY WITH NFPA 101.
  
  
  
 7. A NFPA 13 COMPLAINT FIRE SPRINKLER SYSTEM AND NFPA
 14 COMPLIANT WET STANDPIPE SYSTEM ARE REQUIRED FOR THIS
 STRUCTURE. TEMPORARY STANDPIPES ARE REQUIRED WHEN THE
 BUILDING REACHES THREE LEVELS OR THIRTY FEET WHILE
 BEING CONSTRUCTED. SEPARATE SHOP DRAWINGS, ARE REQUIRED
 TO BE SUBMITTED, REVIEWED AND APPROVED BY THE FIRE
 PREVENTION BUREAU PRIOR TO ANY INSTALLATION.
 HIGH RISES SHALL HAVE TWO SEPARATE SOURCES OF WATER
 SUPPLY.
  
 6.4.5.4* FIRE DEPARTMENT CONNECTIONS SHALL BE LOCATED
 NOT MORE THAN 100 FT (30.5 M) FROM THE NEAREST FIRE
 HYDRANT CONNECTED TO AN APPROVED WATER SUPPLY.
 18.3 WATER SUPPLIES.
 18.3.1* AN APPROVED WATER SUPPLY CAPABLE OF SUPPLYING
 THE REQUIRED FIRE FLOW FOR FIRE PROTECTION SHALL BE
 PROVIDED TO ALL PREMISES UPON WHICH FACILITIES,
 BUILDINGS, OR PORTIONS OF BUILDINGS ARE HEREAFTER
 CONSTRUCTED OR MOVED INTO THE JURISDICTION.
  
 THE APPROVED WATER SUPPLY SHALL BE IN ACCORDANCE WITH
 SECTION 18.4.
  
 PER NFPA 14 SECTION 7.12.2, HIGH-RISE BUILDINGS SHALL
 HAVE AT LEAST TWO REMOTELY LOCATED FIRE DEPARTMENT
 CONNECTIONS FOR EACH ZONE.
  
 ADDITIONALLY,
 PER FLORIDA ADMINISTRATIVE CODE SECTION 61G15-32.004,
 FIRE PROTECTION ENGINEERING DOCUMENTS SHALL INCLUDE THE
 POINT OF SERVICE FOR THE WATER SUPPLY, A LIST OF
 APPLICABLE NFPA STANDARDS APPLICABLE TO THE PROJECT,
 CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR
 AREA, SUPPRESSION SYSTEM TYPE, DESIGN DENSITIES, WATER
 SUPPLY DATA (FIRE PUMP DATA, HYDRANT FLOW TEST DATA)
 AND ANY PERFORMANCE BASED INFORMATION SUCH AS
 PRE-ENGINEERED SYSTEMS.
  
 FOR THE PROPOSED FIRE PUMP(S) , WHAT IS(ARE) THE
 PRIMARY AND SECONDARY POWER SOURCES?
  
  
 8. A CLASS A NFPA 72 COMPLIANT MONITORED FIRE ALARM
 SYSTEM IS REQUIRED FOR THIS STRUCTURE. SEPARATE SHOP
 DRAWINGS, ARE REQUIRED TO BE SUBMITTED, REVIEWED AND
 APPROVED BY THE FIRE PREVENTION BUREAU PRIOR TO ANY
 INSTALLATION.
  
  
 9. ALL ELEVATORS SHALL BE EQUIPPED WITH A REGION 7
 KEYWAY SYSTEM.
 ALL NEW ELEVATORS SHALL CONFORM TO THE FIRE FIGHTER?S
 EMERGENCY OPERATIONS REQUIREMENTS OF ASME A17.1/CSA
 B44, SAFETY CODE FOR ELEVATORS.
 ANY BUILDING THAT IS MORE THAN THREE STORIES HIGH OR IN
 WHICH THE VERTICAL DISTANCE BETWEEN THE BOTTOM TERMINAL
 LANDING AND THE TOP TERMINAL LANDING EXCEEDS 25 FEET
 MUST BE CONSTRUCTED TO CONTAIN AT LEAST ONE PASSENGER
 ELEVATOR THAT IS OPERATIONAL AND WILL ACCOMMODATE AN
 AMBULANCE STRETCHER 76 INCHES LONG AND 24 INCHES WIDE
 IN THE HORIZONTAL POSITION.
  
  
 10. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL
 BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL
 DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS,
 EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A
 PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE
 SAFETY FEATURES AND EQUIPMENT.
  
  
 11. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS
 DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED
 ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF
 FIRE PREVENTION.
 ALL NEW FIRE HYDRANTS AND FDC'S PLANNED FOR THIS
 DEVELOPMENT SHALL BE CLOSELY COORDINATED WITH THE
 BUREAU OF FIRE PREVENTION. PROPOSED FIRE HYDRANTS AND
 FDC'S SHOULD BE LOCATED ON THE SAME SIDE OF THE STREET
 OR ACCESS ROADWAY TO ALLOW FREE ACCESS FOR OTHER
 ARRIVING EMERGENCY VEHICLES.
  
 ADDITIONALLY, SITE ACCESS IS LIMITED AND IT IS UNCLEAR
 WHERE FD WILL GAIN ACCESS TO THE BUILDING AND FD
 EQUIPMENT, I.E FDC, COMMAND ROOM, FACP, ETC. PLEASE
 PROVIDE THE TURNING RADIUS AT THE FRONT AND WIDTH AND
 LENGHT AT THE REAR ENTRANCES WITH AUTO TURN FOR A FD
 LADDER TRUCK. CLOSE COORDINATION WITH THE PREVENTION
 BUREAU IS REQUIRED FOR FINAL EQUIPMENT LOCATIONS.
  
 12. COMMAND ROOM
 THE FIRE COMMAND CENTER SHALL COMPLY WITH NFPA 1,
 CHAPTER 11, BUILDING SERVICES; 11.9 AND SHALL CONTAIN
 THE FOLLOWING FEATURES:
 A. SHALL BE A MINIMUM OF 200 FT SQUARED WITH A MINIMUM
 DIMENSION OF 10 FT.
 B. THE FIRE DEPARTMENT COMMUNICATIONS SYSTEM.
 C. A TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED
 ACCESS TO THE PUBLIC TELEPHONE SYSTEM
 D. SCHEMATIC BUILDING PLANS INDICATING THE TYPICAL
 FLOOR PLAN AND DETAILING THE BUILDING CORE, MEANS OF
 EGRESS, FIRE PROTECTION SYSTEMS, FIRE-FIGHTING
 EQUIPMENT AND FIRE DEPARTMENT ACCESS AND THE LOCATION
 OF FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE
 BARRIERS AND SMOKE PARTITIONS
 E. A WORK TABLE.
 F. IF APPLICABLE, A HAZARDOUS MATERIAL MANAGEMENT PLAN
 FOR THE BUILDING.
 G. THE EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM
 CONTROL UNIT.
 H. ANNUNCIATOR UNIT VISUALLY INDICATING THE LOCATION OF
 THE ELEVATORS AND WHETHER THEY ARE OPERATIONAL
 I. STATUS INDICATORS AND CONTROLS FOR AIR DISTRIBUTION
 SYSTEMS.
 J. CONTROLS FOR UNLOCKING STAIRWAY DOORS SIMULTANEOUSLY
 K. SPRINKLER VALVE AND WATER FLOW DETECTOR DISPLAY
 PANELS
 L. EMERGENCY AND STANDBY POWER STATUS INDICATORS
 M. FIRE PUMP STATUS INDICATORS
 N. GENERATOR SUPERVISION DEVICES AND MANUAL START AND
 TRANSFER FEATURES.
 O. PUBLIC ADDRESS SYSTEM, WHERE SPECIFICALLY REQUIRED
 BY OTHER SECTIONS OF THIS CODE
 P. CONTROLS REQUIRED FOR SMOKE CONTROL
 Q. ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME
 A17.1.
 R. ELEVATOR EMERGENCY OR STANDBY POWER SELECTOR
 SWITCH(ES), WHERE EMERGENCY OR STANDBY POWER IS
 PROVIDED
  
  
 13. RADIO
 NFPA 1, CHAPTER 11, BUILDING SERVICES; 11.10 TWO-WAY
 RADIO ENHANCEMENT SERVICES.
 11.10.1 IN ALL NEW AND EXISTING BUILDINGS, MINIMUM
 RADIO SIGNAL STRENGTH FOR FIRE DEPARTMENT
 COMMUNICATIONS SHALL BE MAINTAINED AT A LEVEL
 DETERMINED BY THE AHJ.
 WEST PALM BEACH FIRE RESCUE (AHJ) ENFORCES THE -95DBM
 NFPA 72 REQUIREMENTS FOR TWO-WAY RADIO COMMUNICATIONS
 SYSTEMS.
  
  
 14. KNOX-BOX KEY SYSTEM SHALL BE REQUIRED FOR THIS
 BUILDING.
 ADDITIONALLY, ANY GATES SHALL BE PROVIDED WITH KNOX KEY
 ACCESS LOCKS, PADLOCKS AND/OR SWITCHES FOR 24 HOUR
 EMERGENCY ACCESS.
  
  
 15. THE SMOKE CONTROL SYSTEM SHALL COMPLY WITH NFPA
 101, CHAPTER 9, BUILDING SERVICE AND FIRE PROTECTION
 EQUIPMENT, INCLUDING:
  
 THE SMOKE CONTROL SYSTEMS SHALL BE INSTALLED,
 INSPECTED, TESTED, AND MAINTAINED IN ACCORDANCE WITH
 NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS; NFPA 204,
 STANDARD FOR SMOKE AND HEAT VENTING; OR NATIONALLY
 RECOGNIZED STANDARDS, ENGINEERING GUIDES, OR
 RECOMMENDED PRACTICES, AS APPROVED BY THE AUTHORITY
 HAVING JURISDICTION.
  
 THE ENGINEER OF RECORD SHALL CLEARLY IDENTIFY THE
 INTENT OF THE SYSTEM, THE DESIGN METHOD USED, THE
 APPROPRIATENESS OF THE METHOD USED, AND THE REQUIRED
 MEANS OF INSPECTING, TESTING, AND MAINTAINING THE
 SYSTEM.
 ACCEPTANCE TESTING SHALL BE PERFORMED BY A SPECIAL
 INSPECTOR IN ACCORDANCE WITH SECTION 9.9.
  
  
 16. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT
 DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL.
  
  
 17. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING
 PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH
 THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop L LANDSCAPING
Rev No 3 Status P Date 03-15-2017 Cont ID  
Sent By rcaranci Date 03-15-2017 Time 11:16 Rev Time 0.00
Received By rcaranci Date 03-15-2017 Time 11:16 Sent To  
Notes
2017-03-15 11:17:04FROM: RAY CARANCI, LANDSCAPE PLANNER
 PROJECT: PALM HARBOR MARINA HOTEL Z16110016
 MARCH 15, 2017
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. CONDITIONALLY SATISFIED. PLEASE PROVIDE A TREE
 MITIGATION CHART IDENTIFYING EXISTING TREES ON THE
 PROPERTY THAT WILL BE REMOVED AND MITIGATION PROVIDED
 PER SECTION 94-448.
 PLEASE PROVIDE A CHART SHOWING MITIGATION REQUIRED.
  
 2. SATISFIED. PLEASE PROVIDE THE PERCENTAGE OF
 VEGETATED AREA AND TREE CANOPY REQUIRED AND PROVIDED
 FOR QUALIFYING PLAZA AREAS PER SECTION 94-444.
  
 3. SATISFIED. PLEASE PROVIDE A LANDSCAPE PLAN FOR THE
 ROOFTOP AMENITY DECK.
  
 4. SATISFIED. PLEASE PROVIDE A COLUMN ON THE PLANT LIST
 SHOWING DROUGHT TOLERANCE LEVELS INDICATED IN
 WATERWISE, THE SOUTH FLORIDA WATER MANAGEMENT DISTRICT
 PLANT AND LANDSCAPE PRACTICES GUIDE AS SPECIFIED IN
 SECTION 94-446(G). PLEASE REVISE AND RECALCULATE TO
 CONFIRM PERCENTAGES FOR POINTS CLAIMED.
  
 5. SATISFIED. PLEASE SHOW THE TOTAL NUMBER OF PARKING
 SPACES PROVIDED ON THE SITE PLAN DATA CHART AND USE
 THIS NUMBER FOR THE CALCULATION OF LANDSCAPE AREA
 REQUIRED PER SECTION 94-443(C)(3).
  
 6. SATISFIED. PLEASE DEMONSTRATE COMPLIANCE WITH
 SECTION 94-443 (C)(4) FOR THE AMOUNT OF LANDSCAPE AREA
 REQUIRED IN THE LANDSCAPE ISLANDS PROVIDING 4 SQUARE
 FEET FOR EACH 100 SQUARE FEET OF OTHER PAVED AREAS
 ADDITIONAL TO PARKING SPACES.
  
 7. SATISFIED. PLEASE PROVIDE A LANDSCAPE TERMINAL
 ISLAND AND REQUIRED SHADE TREE FOR EACH ROW OF PARKING
 IN ALL TERMINAL ISLANDS IN PARKING AREAS PER SECTION
 94-443 (C)(3)A.
 THERE ARE AT LEAST THREE LOCATIONS WHERE THERE IS NO
 SHADE TREE PROVIDED. THE TERMINAL ISLANDS ALSO DO NOT
 MEET THE 5 FOOT MINIMUM WIDTH FOR THE FULL LENGTH OF
 THE PARKING SPACE.
  
 8. SATISFIED. PLEASE SHOW ALL UTILITIES INCLUDING
 WATER, SEWER, AND FPL TRANSFORMERS ON THE LANDSCAPE
 PLAN. ADJUST UTILITY LOCATIONS TO AVOID REQUIRED TREES.
  
 9. SATISFIED. PLEASE INCLUDE A ROOT BARRIER DETAIL AND
 SHOW LOCATIONS OF ROOT BARRIERS TO PROTECT
 INFRASTRUCTURE AND TREES FROM CONFLICTS. THIS INCLUDES
 WATER, SEWER, DRAINAGE, SIDEWALKS AND CURBS, AND ANY
 FIELD STRUCTURES THAT COULD BE IMPACTED BY TREE ROOTS.
  
 10. SATISFIED. PLEASE PROVIDE SCREENING FOR ALL GROUND
 MOUNTED EQUIPMENT AND UTILITIES.
  
 11. SATISFIED. PLEASE PROVIDE DETAILS ON HOW THE
 DUMPSTER ENCLOSURE WILL FUNCTION AND PROVIDE A COMPLETE
 HEDGE AROUND THE THREE NON-ACCESS SIDES OF THE
 DUMPSTER/COMPACTOR ENCLOSURE.
 PROVIDE LANDSCAPING AS REQUIRED.
  
 12. SATISFIED. PLEASE PROVIDE A BUFFER REQUIREMENTS
 CHART LISTING THE REQUIRED BUFFER LENGTH CALCULATIONS
 AND NUMBER OF TREES REQUIRED AND PROVIDED FOR EACH SIDE
 OF THE PROPERTY AND LABEL THE LOCATIONS OF THE 5 FOOT
 REQUIRED BUFFERS PER SECTION 94-442(B).
 ADDITIONAL COMMENTS 1/27/17:
 13. SATISFIED. PLEASE EXPLAIN THE NEED TO ELIMINATE THE
 IMPERVIOUS STRIP ALONG THE CURB AND INSTALL TREE GRATES
 FOR THE ROYAL PALM STREET TREES. HAVING THE GRASS IS
 PREFERABLE TO PAVED AREAS. PROVIDE A DETAIL OF HOW THE
 GRATES AND SIDEWALK AREAS WOULD BE INSTALLED WITHOUT
 NEGATIVELY AFFECTING THE PALMS. INCLUDE STRUCTURAL SOIL
 DETAIL.
  
 14. CONDITIONALLY SATISFIED. PLEASE CORRECT THE OPEN
 SPACE CALCULATION ON SHEET LA-4 TO REFLECT THE MINIMUM
 REQUIRED OPEN SPACE OF 40%, AND RECALCULATE SHADE
 TREES, FLOWERING TREES AND SHRUB COUNTS REQUIRED.
  
 15. SATISFIED. PLEASE REMOVE THE DESIGN OPTIONS
 CALCULATIONS CHART FROM SHEET LA-4 DERIVED FROM SECTION
 94-442 (E) SITE DESIGN FLEXIBILITY, AS THIS IS NOT
 APPLICABLE.
  
 16. SATISFIED. PLEASE CHANGE THE LABEL ON THE CHART
 SHOWING COMPLIANCE WITH SECTION 94-442 (G) FLORIDA
 FRIENDLY LANDSCAPE REQUIREMENTS TO CORRECTLY IDENTIFY
 IT AS SUCH.
  
 17. SATISFIED. PLEASE PROVIDE CALCULATIONS TO SHOW
 COMPLIANCE WITH SECTION 94-443 (E)(1) REQUIRING AT
 LEAST 30 PERCENT OF THE LINEAR FEET AROUND THE BUILDING
 IS PLANTED WITH TREES, SHRUBS OR HEDGES.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
 2. PRIOR TO ISSUANCE OF THE TREE ALTERATION PERMIT, ALL
 CANOPY CALCULATIONS FOR SILVER BUTTONWOOD SHALL BE
 CORRECTED TO 150 CANOPY CREDITS AS A CATEGORY 2 TREE.
  
 3. PRIOR TO ISSUANCE OF THE LANDSCAPE PERMIT, THE
 CALCULATIONS FOR OPEN SPACE USED FOR TREE, FLOWERING
 TREE AND SHRUB CALCULATIONS SHALL BE REVISED TO 40
 PERCENT OF THE SITE AREA EQUAL TO 25,804 SQ FT.
  
 4. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
  
 5. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF
 WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A
 SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  

Review Stop L LANDSCAPING
Rev No 2 Status F Date 01-27-2017 Cont ID  
Sent By rcaranci Date 01-27-2017 Time 10:44 Rev Time 0.00
Received By rcaranci Date 01-27-2017 Time 10:44 Sent To  
Notes
2017-01-27 10:45:02FROM: RAY CARANCI, LANDSCAPE PLANNER
 PROJECT: PALM HARBOR MARINA HOTEL Z16110016
 JANUARY 26, 2017
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. NOT SATISFIED. PLEASE PROVIDE A TREE MITIGATION
 CHART IDENTIFYING EXISTING TREES ON THE PROPERTY THAT
 WILL BE REMOVED AND MITIGATION PROVIDED PER SECTION
 94-448.
 PLEASE PROVIDE A CHART SHOWING MITIGATION REQUIRED.
  
 2. SATISFIED. PLEASE PROVIDE THE PERCENTAGE OF
 VEGETATED AREA AND TREE CANOPY REQUIRED AND PROVIDED
 FOR QUALIFYING PLAZA AREAS PER SECTION 94-444.
  
 3. SATISFIED. PLEASE PROVIDE A LANDSCAPE PLAN FOR THE
 ROOFTOP AMENITY DECK.
  
 4. SATISFIED. PLEASE PROVIDE A COLUMN ON THE PLANT LIST
 SHOWING DROUGHT TOLERANCE LEVELS INDICATED IN
 WATERWISE, THE SOUTH FLORIDA WATER MANAGEMENT DISTRICT
 PLANT AND LANDSCAPE PRACTICES GUIDE AS SPECIFIED IN
 SECTION 94-446(G). PLEASE REVISE AND RECALCULATE TO
 CONFIRM PERCENTAGES FOR POINTS CLAIMED.
  
 5. SATISFIED. PLEASE SHOW THE TOTAL NUMBER OF PARKING
 SPACES PROVIDED ON THE SITE PLAN DATA CHART AND USE
 THIS NUMBER FOR THE CALCULATION OF LANDSCAPE AREA
 REQUIRED PER SECTION 94-443(C)(3).
  
 6. SATISFIED. PLEASE DEMONSTRATE COMPLIANCE WITH
 SECTION 94-443 (C)(4) FOR THE AMOUNT OF LANDSCAPE AREA
 REQUIRED IN THE LANDSCAPE ISLANDS PROVIDING 4 SQUARE
 FEET FOR EACH 100 SQUARE FEET OF OTHER PAVED AREAS
 ADDITIONAL TO PARKING SPACES.
  
 7. NOT SATISFIED. PLEASE PROVIDE A LANDSCAPE TERMINAL
 ISLAND AND REQUIRED SHADE TREE FOR EACH ROW OF PARKING
 IN ALL TERMINAL ISLANDS IN PARKING AREAS PER SECTION
 94-443 (C)(3)A.
 THERE ARE AT LEAST THREE LOCATIONS WHERE THERE IS NO
 SHADE TREE PROVIDED. THE TERMINAL ISLANDS ALSO DO NOT
 MEET THE 5 FOOT MINIMUM WIDTH FOR THE FULL LENGTH OF
 THE PARKING SPACE.
  
 8. SATISFIED. PLEASE SHOW ALL UTILITIES INCLUDING
 WATER, SEWER, AND FPL TRANSFORMERS ON THE LANDSCAPE
 PLAN. ADJUST UTILITY LOCATIONS TO AVOID REQUIRED TREES.
  
 9. SATISFIED. PLEASE INCLUDE A ROOT BARRIER DETAIL AND
 SHOW LOCATIONS OF ROOT BARRIERS TO PROTECT
 INFRASTRUCTURE AND TREES FROM CONFLICTS. THIS INCLUDES
 WATER, SEWER, DRAINAGE, SIDEWALKS AND CURBS, AND ANY
 FIELD STRUCTURES THAT COULD BE IMPACTED BY TREE ROOTS.
  
 10. SATISFIED. PLEASE PROVIDE SCREENING FOR ALL GROUND
 MOUNTED EQUIPMENT AND UTILITIES.
  
 11. NOT SATISFIED. PLEASE PROVIDE DETAILS ON HOW THE
 DUMPSTER ENCLOSURE WILL FUNCTION AND PROVIDE A COMPLETE
 HEDGE AROUND THE THREE NON-ACCESS SIDES OF THE
 DUMPSTER/COMPACTOR ENCLOSURE.
 PROVIDE LANDSCAPING AS REQUIRED.
  
 12. SATISFIED. PLEASE PROVIDE A BUFFER REQUIREMENTS
 CHART LISTING THE REQUIRED BUFFER LENGTH CALCULATIONS
 AND NUMBER OF TREES REQUIRED AND PROVIDED FOR EACH SIDE
 OF THE PROPERTY AND LABEL THE LOCATIONS OF THE 5 FOOT
 REQUIRED BUFFERS PER SECTION 94-442(B).
 ADDITIONAL COMMENTS 1/27/17:
 13. PLEASE EXPLAIN THE NEED TO ELIMINATE THE IMPERVIOUS
 STRIP ALONG THE CURB AND INSTALL TREE GRATES FOR THE
 ROYAL PALM STREET TREES. HAVING THE GRASS IS PREFERABLE
 TO PAVED AREAS. PROVIDE A DETAIL OF HOW THE GRATES AND
 SIDEWALK AREAS WOULD BE INSTALLED WITHOUT NEGATIVELY
 AFFECTING THE PALMS. INCLUDE STRUCTURAL SOIL DETAIL.
  
 14. PLEASE CORRECT THE OPEN SPACE CALCULATION ON SHEET
 LA-4 TO REFLECT THE MINIMUM REQUIRED OPEN SPACE OF 40%,
 AND RECALCULATE SHADE TREES, FLOWERING TREES AND SHRUB
 COUNTS REQUIRED.
  
 15. PLEASE REMOVE THE DESIGN OPTIONS CALCULATIONS CHART
 FROM SHEET LA-4 DERIVED FROM SECTION 94-442 (E) SITE
 DESIGN FLEXIBILITY, AS THIS IS NOT APPLICABLE.
  
 16. PLEASE CHANGE THE LABEL ON THE CHART SHOWING
 COMPLIANCE WITH SECTION 94-442 (G) FLORIDA FRIENDLY
 LANDSCAPE REQUIREMENTS TO CORRECTLY IDENTIFY IT AS
 SUCH.
  
 17. PLEASE PROVIDE CALCULATIONS TO SHOW COMPLIANCE WITH
 SECTION 94-443 (E)(1) REQUIRING AT LEAST 30 PERCENT OF
 THE LINEAR FEET AROUND THE BUILDING IS PLANTED WITH
 TREES, SHRUBS OR HEDGES.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
  
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF
 WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A
 SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  

Review Stop L LANDSCAPING
Rev No 1 Status F Date 12-08-2016 Cont ID  
Sent By rcaranci Date 12-08-2016 Time 16:54 Rev Time 0.00
Received By rcaranci Date 12-08-2016 Time 16:54 Sent To  
Notes
2016-12-08 16:54:52FROM: RAY CARANCI, LANDSCAPE PLANNER
 PROJECT: PALM HARBOR MARINA HOTEL Z16110016
 DECEMBER 8, 2016
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. PLEASE PROVIDE A TREE MITIGATION CHART IDENTIFYING
 EXISTING TREES ON THE PROPERTY THAT WILL BE REMOVED AND
 MITIGATION PROVIDED PER SECTION 94-448.
  
 2. PLEASE PROVIDE THE PERCENTAGE OF VEGETATED AREA AND
 TREE CANOPY REQUIRED AND PROVIDED FOR QUALIFYING PLAZA
 AREAS PER SECTION 94-444.
  
 3. PLEASE PROVIDE A LANDSCAPE PLAN FOR THE ROOFTOP
 AMENITY DECK.
  
 4. PLEASE PROVIDE A COLUMN ON THE PLANT LIST SHOWING
 DROUGHT TOLERANCE LEVELS INDICATED IN WATERWISE, THE
 SOUTH FLORIDA WATER MANAGEMENT DISTRICT PLANT AND
 LANDSCAPE PRACTICES GUIDE AS SPECIFIED IN SECTION
 94-446(G). PLEASE REVISE AND RECALCULATE TO CONFIRM
 PERCENTAGES FOR POINTS CLAIMED.
  
 5. PLEASE SHOW THE TOTAL NUMBER OF PARKING SPACES
 PROVIDED ON THE SITE PLAN DATA CHART AND USE THIS
 NUMBER FOR THE CALCULATION OF LANDSCAPE AREA REQUIRED
 PER SECTION 94-443(C)(3).
  
 6. PLEASE DEMONSTRATE COMPLIANCE WITH SECTION 94-443
 (C)(4) FOR THE AMOUNT OF LANDSCAPE AREA REQUIRED IN THE
 LANDSCAPE ISLANDS PROVIDING 4 SQUARE FEET FOR EACH 100
 SQUARE FEET OF OTHER PAVED AREAS ADDITIONAL TO PARKING
 SPACES.
  
 7. PLEASE PROVIDE A LANDSCAPE TERMINAL ISLAND AND
 REQUIRED SHADE TREE FOR EACH ROW OF PARKING IN ALL
 TERMINAL ISLANDS IN PARKING AREAS PER SECTION 94-443
 (C)(3)A.
  
 8. PLEASE SHOW ALL UTILITIES INCLUDING WATER, SEWER,
 AND FPL TRANSFORMERS ON THE LANDSCAPE PLAN. ADJUST
 UTILITY LOCATIONS TO AVOID REQUIRED TREES.
  
 9. PLEASE INCLUDE A ROOT BARRIER DETAIL AND SHOW
 LOCATIONS OF ROOT BARRIERS TO PROTECT INFRASTRUCTURE
 AND TREES FROM CONFLICTS. THIS INCLUDES WATER, SEWER,
 DRAINAGE, SIDEWALKS AND CURBS, AND ANY FIELD STRUCTURES
 THAT COULD BE IMPACTED BY TREE ROOTS.
  
 10. PLEASE PROVIDE SCREENING FOR ALL GROUND MOUNTED
 EQUIPMENT AND UTILITIES.
  
 11. PLEASE PROVIDE DETAILS ON HOW THE DUMPSTER
 ENCLOSURE WILL FUNCTION AND PROVIDE A COMPLETE HEDGE
 AROUND THE THREE NON-ACCESS SIDES OF THE
 DUMPSTER/COMPACTOR ENCLOSURE.
  
 12. PLEASE PROVIDE A BUFFER REQUIREMENTS CHART LISTING
 THE REQUIRED BUFFER LENGTH CALCULATIONS AND NUMBER OF
 TREES REQUIRED AND PROVIDED FOR EACH SIDE OF THE
 PROPERTY AND LABEL THE LOCATIONS OF THE 5 FOOT REQUIRED
 BUFFERS PER SECTION 94-442(B).
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop PARK PARKING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop POLICE POLICE
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PW PUBLIC WORKS
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop STORM STORMWATER
Rev No 2 Status F Date 01-19-2017 Cont ID  
Sent By tward Date 01-19-2017 Time 07:46 Rev Time 0.00
Received By tward Date   Time   Sent To  
Notes
2017-01-19 08:35:11THESE COMMENTS ARE FROM THE REVIEW OF THE THE JANUARY
 11, 2017 SUBMITTAL PACKAGE:
  
 1. STORMWATER QUALITY TREATMENT IS NEEDED FOR THE
 PARKING LOT SOUTH OF THE HOTEL.
  
 2. THE PROPOSED, RELOCATED 18" SANITARY SEWER MAY BE IN
 CONFLICT WITH THE EXISTING 36" RCP STORM PIPE.
  
 3. INDICATE MILL AND OVERLAY LIMITS WHERE UTILITES ARE
 BEING CONSTRUCTED IN THE ROAD PER CITY STANDARDS.
  
 4. RECOMMEND CONDUCTING A CONDITION ASSESSMENT OF THE
 EXISTING CLAY STORM PIPES WITHIN THE SITE.
  
 5. SURVEY AND ENGINEERING PLANS ARE USING DIFFERENT
 VERTICAL DATUMS. THE CURRENT CITY DATUM IS NATIONAL
 GEODETIC VERTICAL DATUM OF 1929 (NGVD1929). THE NORTH
 AMERICAN VERTICAL DATUM OF 1988 (NAVD1988) MAY BE USED
 FOR THIS SITE PROVIDED A CONVERSION FACTOR BETWEEN
 NAVD1988 AND NGVD1929 IS PROVIDED. THE VERTICAL DATUM
 SHOULD BE CONSISTENT ACROSS ALL PLANS/SURVEYS AND
 LABELED ON THE SHEETS WHERE ELEVATION INFORMATION IS
 PROVIDED.
  
 TRACY L. WARD, P.E.
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120
  
  

Review Stop STORM STORMWATER
Rev No 1 Status F Date 12-14-2016 Cont ID  
Sent By tward Date 12-14-2016 Time 08:48 Rev Time 0.00
Received By tward Date 12-14-2016 Time 08:49 Sent To  
Notes
2016-12-14 08:49:38THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT HTTP://
 WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PER
 MITS-APPLICATIONS
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. PRELIMINARY, UPDATED FEMA FLOOD INSURANCE MAPS ARE
 AVAILABLE AT
 HTTP://MAPS.CO.PALM-BEACH.FL.US/GIS/FLOODZONES.ASPX?.
 PLEASE REVIEW THE MAPS AND VERIFY THAT THE NEW MAPS
 WILL NOT IMPACT THE PROPOSED PROJECT.
  
 2. THE CITY COMMISSION RECENTLY PASSED A RESOLUTION
 INCREASING THE FREEBOARD REQUIREMENT TO ONE FOOT ABOVE
 BASE FLOOD ELEVATION FOR STRUCTURES IN A SPECIAL FLOOD
 HAZARD AREA.
  
 3. EXPLAIN WHAT CPP STORM PIPE IS.
  
 4. SHOW UTILITIES ON THE LANDSCAPE PLANS
  
 5. EXPLAIN HOW STORMWATER TREATMENT WILL BE PROVIDED.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE
 ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  

Review Stop SURVEY SURVEYING
Rev No 1 Status F Date 12-13-2016 Cont ID  
Sent By vnoel Date 12-13-2016 Time 10:45 Rev Time  
Received By vnoel Date   Time   Sent To  
Notes
2016-12-13 10:55:591. MAINTENANCE AGREEMENT WILL BE REQUIRED FOR
 IMPROVEMENTS/LANDSCAPING WITHIN RIGHT-OF-WAY.
 2. WHO OWNS THE 3 FOOT STRIP BETWEEN FLAGLER DRIVE AND
 THE LEASE BOUNDARY? IS THIS PARCEL LAND-LOCKED?
 3. PROPOSED SANITARY SEWER NEEDS TO BE RELOCATED OFF
 SIDEWALK.
 4. ADD EXISTING AND PROPOSED UTILITIES TO LANDSCAPE
 PLANS.

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 2 Status P Date   Cont ID  
Sent By   Date 03-14-2017 Time   Rev Time 0.00
Received By bcollins Date 03-14-2017 Time 13:08 Sent To  
Notes
2017-03-14 13:10:11APPROVAL SUBJECT TO CONDITIONS IDENTIFIED BY MS. DANG
 IN HER PREVIOUS NOTE.

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status F Date 02-07-2017 Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
2017-02-07 09:16:33PALM HARBOR MARINA
  
 - CONTACT UYEN DANG @ (561) 494-1087
  
 1) MILLING AND RESURFACING LIMIT INCLUDES ENTIRE
 FRONTAGE OF PROPERTY TO THE CENTERLINE OF THE PROPERTY.
 2) PAVEMENT RESTORATION TO MEET WPB STANDARDS OF 50? ON
 EACH SIDE OF TRENCH.
 3) PROVIDE SIGNING AND STRIPING PLANS FOR FLAGLER DR.
 AS PART OF RESTORATION PLAN
 4) PROVIDE PHOTOMETRICS
 5) CONSTRUCTION ROUTE TO BE ON BANYAN BLVD. NO
 CONSTRUCTION TRAFFIC ARE TO ENTER THROUGH THE WATER
 FRONT FROM OKEECHOBEE BLVD.
  

Review Stop Z ZONING
Rev No 2 Status F Date 02-02-2017 Cont ID  
Sent By aaponte Date 02-02-2017 Time 16:33 Rev Time 0.00
Received By aaponte Date 01-09-2017 Time 16:34 Sent To  
Notes
2017-02-02 16:33:292ND REVIEW
 1. PARTIALLY SATISFIED - PLEASE INCLUDE INT HE PARKING
 CALCULATION SHEET THE INFORMATION REGARDING THE TOTAL
 NUMBER OF EXISTING SLIPS, THE REQUIRED SPACES, PLUS THE
 SQUARE FOOTAGE OF THE COMMERCIAL USES AND THE REQUIRED
 SPACES. ALSO PROVIDE A COPY OF THE LEGAL DOCUMENT THAT
 IDENTIFIES 166 SPACES FOR THE MARINA USE WITHIN THE
 EXISTING PARKING GARAGE. EXISTING PARKING LOT INCLUDES
 96 SPACES FOR MARINA USE. PLEASE PROVIDE INFORMATION
 INDICATING NUMBER OF SLIPS CURRENTLY EXISTING AND
 APPROVED IF NOT ALL BUILT, REQUIRED PARKING AND
 LOCATION OF MARINA PARKING ONCE SURFACE LOT IS REMOVED.
 2. DONE-SURVEY SHALL INCLUDE THE DIMENSION FROM BACK OF
 CURB ON FLAGLER DRIVE TO PROPERTY LINE.
 3. DONE-PLEASE PROVIDE INFORMATION TO CONFIRM
 COMPLIANCE WITH THE REQUIREMENT OF ONE TREE EVERY 25
 FEET OF STREET FRONTAGE. AS THE FLAGLER DRIVE
 STREETSCAPE PATTERN IS ROYAL PALMS, THE COMPLIANCE WITH
 THIS REQUIREMENT SHALL BE TO MAINTAIN THE EXISTING
 ROYAL PALM PLANTING PATTERN, AND FILL IN THE GAPS WITH
 NEW PALMS OR REPLACING THOSE IN BAD CONDITION.
 4. PARTIALLY SATISFIED. DUMPSTER SHALL BE SCREENED ,
 PROVIDE MINIMUM CLEARANCE FOR TRUCK.- PLEASE PROVIDE
 ADDITIONAL INFORMATION TO CONFIRM ALL BUILDING
 EQUIPMENT IS SCREENED FROM ABOVE AND BELOW.
 5. PARTIALLY SATISFIED. PLEASE PROVIDE DETAILS FOR THE
 PROPOSED SCREENING FOR MECHANICAL EQUIPMENT.-PLEASE
 PROVIDE ADDITIONAL INFORMATION ON THE FINISHED MATERIAL
 OF ALL BUILDING ROOFS, INCLUDING POOL DECK AND ANY
 CANOPIES. TAR AND GRAVEL OR BALLAST SHALL NOT BE
 UTILIZED AS FINISHING MATERIALS.
 6. PARTIALLY SATISFIED. PLEASE REMOVE REFERENCE TO
 URBAN CORE PARKING REQUIREMENTSPLEASE REVISE PARKING
 DATA TO REFLECT THE PARKING REQUIREMENTS FOR A HOTEL
 WITHIN A SPECIAL DISTRICT ACCORDING TO TABLE IV-9 IN
 ARTICLE IV OF THE ZONING CODE. PARKING CALCULATIONS
 SHALL BE BASED ON NET INTERIOR AREA WHEN REQUIREMENT IS
 BASED ON SQUARE FOOTAGE.
 7. NOT SATISFIED. STRIPING DETAIL IN SHEET A1.1.01
 SHALL FOLLOW CITY STANDARDS- ALL PARKING SPACES SHALL
 BE STRIPED FOLLOWING CITY STANDARDS.
 8. NOT SATISFIED. NOTE NOT REMOVED - PROJECT COMPLIES
 WITH MINIMUM REQUIRED PARKING, PLEASE REMOVE NOTE
 REGARDING PAYMENT IN LIEU FROM PARKING TABLE. 10%
 REDUCTION ON PARKING REQUIREMENT IS NOT APPLICABLE TO
 HOTEL USES, PLEASE REMOVE NOTE FROM TABLE.
 9. NOT SATISFIED.-PLEASE PROVIDE DETAIL DRAWINGS FOR
 THE TWO PARKING AREAS INCLUDING DIMENSIONS FOR PARKING
 SPACES AND DRIVE AISLES, STRIPING DETAIL, WHEEL STOPS
 OR CONTINUOUS CURB DETAIL ETC.
 10.DONE.-BASED ON THE TOTAL NUMBER OF PARKING SPACES
 PROVIDED (65), 3 PARKING SPACES FOR THE DISABLED ARE
 REQUIRED. PLEASE DISCUSS WITH THE BUILDING OFFICIAL ON
 THE LOCATION OF THE SPACES DUE TO THE FACT THAT THE
 PROJECT INCLUDES TWO SEPARATE PARKING LOTS (ONE VALET
 ONLY AND ONE SELF PARKING).
 11. PARTIALLY SATISFIED. PLEASE INCLUDE DETAILS ON
 PROPOSED RACK AND LOCATION.- PLEASE PROVIDE INFORMATION
 TO CONFIRM COMPLIANCE WITH BICYCLE PARKING
 REQUIREMENTS. INDICATE NUMBER AND LOCATION. 1/20 SPACES
 REQUIRED.
 12. NOT SATISFIED.- PROPOSED PROJECT DOES NOT MEET THE
 MINIMUM LOADING REQURIEMENTS SPECIFIED IN TABLEXV-4. A
 VARIANCE WILL BE REQUIRED TO REDUCE THE NUMBER OF
 LOADING SPACES.
 13. PLEASE PROVIDE INFORMATION TO CONFIRM COMPLIANCE
 WITH MINIMUM REQUIRED SETBACKS ALONG ALL SIDES.
 INDICATE DIMENSION FROM BACK OF CURB OR PROPERTY LINES
 WHEN APPLICABLE.
 14. PARTIALLY SATISDIED. PLEASE INCLUDE PL AND SETBACK
 LINES IN ALL FLOOR PLANS, ELEVATIONS AND SECTIONS.-
 PLEASE INDICATE PROPERTY LINES IN ALL FLOOR PLANS AND
 ELEVATIONS.
 15. PARTIALLY SATISFIED. INFORMATION SHALL BE PROVIDED
 ACCORDING TO DEFINITIONS OF OPEN SPACE, PLAZA,
 LANDSCAPE AREA, BUILDING COVERAGE ETS IN SEC 94-130.
 PLAZA AREA CANNOT INCLUDE SIDEWALK AREAS-PLEASE INCLUDE
 TOTAL SQUARE FOOTAGE AND PERCENTAGES ON GRAPHIC
 INCLUDED IN SHEET A0.0.04 TO ILLUSTRATE COMPLIANCE WITH
 MINIMUM REQUIRED OPEN SPACE AREA, MINIMUM PLAZA AREA,
 AND MINIMUM LANDSCAPE AREAS. PLEASE PROVIDE A CADD
 DRAWING OF THIS SHEET TO ALLOW MEASUREMENTS.
 16. DONE.-PLEASE PROVIDE ADDITIONAL DETAIL FOR THE
 SERVICE AREA, INCLUDING EXACT LOCATION OF DUMPSTER AND
 ITS SCREENING.
 17.NOT SATISFIED. PLEASE PROVIDE DETAILS ON PLAZA. FUEL
 TANK AREA CANNOT BE COUNTED AS A PLAZA AREA UNLESS
 IMPROVED FOR PEOPLE TO ENJOY THE SPACE. PLEASE PROVIDE
 DETAILS ON RETAINING WALL TREATMENT AND HEIGHT TO
 IDENTIFY THE IMPACT ON THE PLAZA SPACE.- PLEASE PROVIDE
 INFORMATION TO CONFIRM COMPLIANCE WITH PLAZA
 REQUIREMENTS IN SEC 94-444.
 18. NOT SATISFIED.-PLEASE PROVIDE ADDITIONAL
 INFORMATION FOR PROPOSED LANDSCAPE AND HARDSCAPE OF THE
 PROPOSED PLAZA.
 19. DONE-PLEASE PROVIDE INFORMATION REGARDING THE USE
 OF THE 3RD STREET DRIVEWAY, OUTSIDE PROPERTY
 BOUNDARIES.
 20. ELEVATIONS SHALL ACCURATELY REFLECT THE GRADE
 DIFFERENCE BETWEEN THE HOTEL LOBBY ENTRANCE AND THE
 FLAGLER DRIVE SIDEWALK AND ROAD, AS WELL AS THE
 PROMENADE ALONG THE WATERFRONT.
 21. PLEASE INDICATE THE PROPERTY LINE AND REQUIRED
 SETBACK LINES IN ALL ELEVATIONS AND SECTIONS.
 22. PLEASE INDICATE PROPOSED LOCATION OF REQUIRED ART
 IN PUBLIC PLACES.
 23.STAFF RECOMMENDS A NEW WINDOW TO BE ADDED ON THE
 FIRST FLOOR OF THE EXIT STAR FACING FLAGLER DRIVE TO
 MINIMIZE THE LACK OF ACTIVE USES ALONG FLAGLER DRIVE.
 24. PLEASE INCLUDE THE EXISTING CONDITIONS OF THE AREA
 INMEDIATELY NORTH OF THE PROPERTY LINE WITH THE
 WATERVIEW RESIDENTIAL BUILDING TO DETERMINE ANY IMPACTS
 ON EXISING SPACE.
 FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA
 APONTE AT 561-822-1439

Review Stop Z ZONING
Rev No 1 Status F Date 12-13-2016 Cont ID  
Sent By aaponte Date 12-13-2016 Time 15:48 Rev Time 0.00
Received By aaponte Date 12-13-2016 Time 15:47 Sent To  
Notes
2016-12-14 08:21:371. EXISTING PARKING LOT INCLUDES 96 SPACES FOR MARINA
 USE. PLEASE PROVIDE INFORMATION INDICATING NUMBER OF
 SLIPS CURRENTLY EXISTING AND APPROVED IF NOT ALL BUILT,
 REQUIRED PARKING AND LOCATION OF MARINA PARKING ONCE
 SURFACE LOT IS REMOVED.
 2. SURVEY SHALL INCLUDE THE DIMENSION FROM BACK OF CURB
 ON FLAGLER DRIVE TO PROPERTY LINE.
 3. PLEASE PROVIDE INFORMATION TO CONFIRM COMPLIANCE
 WITH THE REQUIREMENT OF ONE TREE EVERY 25 FEET OF
 STREET FRONTAGE. AS THE FLAGLER DRIVE STREETSCAPE
 PATTERN IS ROYAL PALMS, THE COMPLIANCE WITH THIS
 REQUIREMENT SHALL BE TO MAINTAIN THE EXISTING ROYAL
 PALM PLANTING PATTERN, AND FILL IN THE GAPS WITH NEW
 PALMS OR REPLACING THOSE IN BAD CONDITION.
 4. PLEASE PROVIDE ADDITIONAL INFORMATION TO CONFIRM ALL
 BUILDING EQUIPMENT IS SCREENED FROM ABOVE AND BELOW.
 5. PLEASE PROVIDE ADDITIONAL INFORMATION ON THE
 FINISHED MATERIAL OF ALL BUILDING ROOFS, INCLUDING POOL
 DECK AND ANY CANOPIES. TAT, TAR AND GRAVEL OR BALLAST
 SHALL NOT BE UTILIZED AS FINISHING MATERIALS.
 6. PLEASE REVISE PARKING DATA TO REFLECT THE PARKING
 REQUIREMENTS FOR A HOTEL WITHIN A SPECIAL DISTRICT
 ACCORDING TO TABLE IV-9 IN ARTICLE IV OF THE ZONING
 CODE. PARKING CALCULATIONS SHALL BE BASED ON NET
 INTERIOR AREA WHEN REQUIREMENT IS BASED ON SQUARE
 FOOTAGE.
 7. ALL PARKING SPACES SHALL BE STRIPED FOLLOWING CITY
 STANDARDS.
 8. PROJECT COMPLIES WITH MINIMUM REQUIRED PARKING,
 PLEASE REMOVE NOTE REGARDING PAYMENT IN LIEU FROM
 PARKING TABLE. 10% REDUCTION ON PARKING REQUIREMENT IS
 NOT APPLICABLE TO HOTEL USES, PLEASE REMOVE NOTE FROM
 TABLE.
 9. PLEASE PROVIDE DETAIL DRAWINGS FOR THE TWO PARKING
 AREAS INCLUDING DIMENSIONS FOR PARKING SPACES AND DRIVE
 AISLES, STRIPING DETAIL, WHEEL STOPS OR CONTINUOUS CURB
 DETAIL ETC.
 10.BASED ON THE TOTAL NUMBER OF PARKING SPACES PROVIDED
 (65), 3 PARKING SPACES FOR THE DISABLED ARE REQUIRED.
 PLEASE DISCUSS WITH THE BUILDING OFFICIAL ON THE
 LOCATION OF THE SPACES DUE TO THE FACT THAT THE PROJECT
 INCLUDES TWO SEPARATE PARKING LOTS (ONE VALET ONLY AND
 ONE SELF PARKING).
 11.PLEASE PROVIDE INFORMATION TO CONFIRM COMPLIANCE
 WITH BICYCLE PARKING REQUIREMENTS. INDICATE NUMBER AND
 LOCATION. 1/20 SPACES REQUIRED.
 12. PROPOSED PROJECT DOES NOT MEET THE MINIMUM LOADING
 REQURIEMENTS SPECIFIED IN TABLEXV-4. A VARIANCE WILL BE
 REQUIRED TO REDUCE THE NUMBER OF LOADING SPACES.
 13. PLEASE PROVIDE INFORMATION TO CONFIRM COMPLIANCE
 WITH MINIMUM REQUIRED SETBACKS ALONG ALL SIDES.
 INDICATE DIMENSION FROM BACK OF CURB OR PROPERTY LINES
 WHEN APPLICABLE.
 14. PLEASE INDICATE PROPERTY LINES IN ALL FLOOR PLANS
 AND ELEVATIONS.
 15. PLEASE INCLUDE TOTAL SQUARE FOOTAGE AND PERCENTAGES
 ON GRAPHIC INCLUDED IN SHEET A0.0.04 TO ILLUSTRATE
 COMPLIANCE WITH MINIMUM REQUIRED OPEN SPACE AREA,
 MINIMUM PLAZA AREA, AND MINIMUM LANDSCAPE AREAS. PLEASE
 PROVIDE A CADD DRAWING OF THIS SHEET TO ALLOW
 MEASUREMENTS.
 16. PLEASE PROVIDE ADDITIONAL DETAIL FOR THE SERVICE
 AREA, INCLUDING EXACT LOCATION OF DUMPSTER AND ITS
 SCREENING.
 17. PLEASE PROVIDE INFORMATION TO CONFIRM COMPLIANCE
 WITH PLAZA REQUIREMENTS IN SEC 94-444.
 18. PLEASE PROVIDE ADDITIONAL INFORMATION FOR PROPOSED
 LANDSCAPE AND HARDSCAPE OF THE PROPOSED PLAZA.
 19. PLEASE PROVIDE INFORMATION REGARDING THE USE OF THE
 3RD STREET DRIVEWAY, OUTSIDE PROPERTY BOUNDARIES.
 FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA
 APONTE AT 561-822-1439
  